{{#Wiki_filter:P RIQRITY ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.
{{#Wiki_filter:RIQRITY PACCELERATED    RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Rochester Gas 6 Electric Corp.WIDAY,J.A.
DOCKET  N FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester                           G 05000244 AUTH. NAME             AUTHOR AFFILIATION WALDEN,J.V.           Rochester Gas 6 Electric Corp.
Rochester Gas 6 Electric Corp.RECIP.NAME RECIPIENT AFFILIATION DOCKET N 05000244 P
WIDAY,J.A.             Rochester Gas 6 Electric Corp.                                                   P RECIP.NAME             RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for May 1995 for Ginna NP./950606 ltr~DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specks NOTES:License Exp date in-accordance with 10CFR2,2.109(9/19/72).
Monthly operating rept               for May 1995     for Ginna   NP .   /950606 ltr ~
05000244 p RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DISP/PIPB RGN1 EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME JOHNSON,A KTE.01 NRR/DOPS70ECB NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D C U N NOTE TO ALL RIDS" RECIPIENTS:
DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR                           ENCL       SIZE:
PLEASE HELP US TO REDUCE iVASTE!CONTACTTI IE DOCUWIENT CONTROL DESK, ROOK/PI.37 (EXT.504.2083)TO ELIAIINATE YOUR 4'AVE~FRONI DISTRI!3UTION LISTS FOR DOCL'MEN'I'S YOU DON"I'L'ED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10  
TITLE: Monthly Operating Report (per Tech Specks NOTES:License Exp date in- accordance with 10CFR2,2.109(9/19/72).                             05000244 p RECIPIENT                 COPIES            RECIPIENT              COPIES ID   CODE/NAME               LTTR ENCL        ID  CODE/NAME        LTTR ENCL PD1-1 PD                         1      1      JOHNSON,A                  1      1 INTERNAL: AEOD/SPD/RRAB                     1      1                KTE  . 01      1      1 NRR/DISP/PIPB                   1      1      NRR/DOPS70ECB              1      1 RGN1                             1      1 EXTERNAL: LITCO BRYCE,J H                   1     1     NOAC                       1     1 NRC PDR                          1     1 D
~V 7 l/ized~y zzz l 1I~Ow~1~ZZ::." ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649-0001 TKI.KPHONK ARKA COOK 7IO 546.2700 GINNA STATION June 6, 1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555  
C U
N NOTE TO ALL RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE! CONTACTTIIE DOCUWIENT CONTROL DESK, ROOK/ PI.37 (EXT. 504.2083 ) TO ELIAIINATEYOUR 4'AVE~ FRONI DISTRI!3UTION LISTS FOR DOCL'MEN'I'S YOU DON "I'L'ED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                   10   ENCL       10
 
7
~ V l/ized~ y zzz                                                             l 1I ~ Ow ~ 1 ~
ZZ::."
ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TKI.KPHONK ARKA COOK 7IO 546.2700 GINNA STATION June 6, 1995 US   Nuclear Regulatory Commission Document     Control Desk Washington,     DC 20555


==Subject:==
==Subject:==
Monthly Report for May, 1995 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.'0-244  
Monthly Report for May, 1995 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No.'0-244
 
==Dear    Sir:==
 
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of May, 1995.
Very truly  yours, s  h A. Wid ant Manager JAW:tjn Attachments c:    Mr. Thomas T. Martin    NRC (1)
I
        '7506200025 9'50531 PDR    'ADOCK 05000244 R                    PDR                                          ZpPf I
 
OPERATING DATA REPORT 50-244 Jun  6 1995 COMPLETED BY John V. Walden TELEPHONE (315)5244446 Ext.588
: 1. Unit Name:              R.E. GINNA NUCLEAR POWER PLANT
: 2. Reporting Period:            Ma  1995
: 3. Licensed Thermal Power (MWt):                          1520
: 4. Nameplate Rating (Gross MWe):                          490
: 5. Design Electric Rating (Net MWe):                    470
: 6. Maximum Dependable Capacity (Gross MWe):              490
: 7. Maximum Dependable Capacity (Net MWe):                470 8., if Changes  Occur in Capacity Rating (items Number 3 Through 7) Since Last Report, Give Reason:
: 9. Power Level to Which Restricted, If Any (Net MWe:
: 10. Reason For Restrictions, If An:
This Month          Yr.-to-Date              Cumulative
: 11. Hours in Reported Period                                744.0                  3623.0                223631.0
: 12. Number of hours Reactor Was Critical                    690.2                  2746.5                178562.2
: 13. Reactor Reserve Shutdown Hours                            0.0                    0.0 .                1687.6
: 14. Hours Generator On-line                                658.3                  2685.3                175657.6
: 15. Unit Reserve Shutdown Hours                                0.0                    0.0                      8.5
: 16. Gross Thermal Energy Generated (MWH)                934804.0              3942688.0              249457925.0
: 17. Gross Electrical Energy Generated (MWH)              316061.0              1333378.0                82567430.0
: 18. Net Electrical Energy Generated (MWH)                300318.0              1267669.0                78376899.0
: 19. Unit Service Factor (%)                                  88.5                    74.1                      78.5
: 20. Unit Availability Factor (%)                            88.5                    74.1                      78.6
: 21. Unit Capacity Factor (using MDC Net) (%)                85.9                    74.4                      75.7
: 22. Unit Capacity Factor (using DER Net) (%)                85.9                    74.4                      75.7
: 23. Unit Forced Outage Rate (%)                                0.0                    0.0                      5.6
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Refuelin and Maintenance Started 3/26/95 Finished 5/4/95 Duration 39 da
: 25. If Shutdown At End of Report Period. Estimate Date of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                  Forcast                  Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
* CUMULATIVETOTAL COMMENCING JANUARY 1. 1975 CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: June 6 1995 COMPLETED BY:
John Walden TELEPHONE:  315 524-4446    Ext. 588 MONTH    Ma  1995 DAY AVERAGE  DAILY POWER LEVEL        DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                          (MWe-Net)
: 17.          474 2 ~                                    18.          474
: 3.                                    19.          474
: 4.            36                      20.          475
: 5.          211                      21.          475 6.
7.
8.
404 448 474 22.
23 24.
                                          '75      474 475
: 9.          474                      25.          475
: 10.          475                      26.          475 475                      27.          475 12;          475                      28.          476
: 13.          475                      29.          476
: 14.          475                      30.          475
: 15.          474                      31.          475
: 16.          474 INSTRUCTIONS On  this format,  list the average daily unit power level in MWe-Net  for each  day in reporting month. 'ompute to the nearest whole megawatt.
 
DOCKET NO.          ~0-244 UNlTNAhlE  R.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS COh)PLETl:D BY            V g hn V. Walden TELEPlIONf( 3l5 ) 524-4446 Ext. 588 I
rI4        0 0I >>                              c c                c v    Licensee                  0 IA            Cause & Corrective 0          c                            Em        c No.            Date    0 I0 0 0
0 0>>    0    Event          0  0      0 0 0 0                    Action to 0          0                                0                        Prevent Recurrence I          ~
X.'        0 In  C  Report II      cA (J O
0 O
5-03        3/26/95 S      937.7                                                      Continuation of Annual Refueling Shutdown 1
F: Forced            Reason:                                      hletbod:                          Fxhibit G - Instructions S:    Scheduled      A-Equipment Failure (Explain)                1 hhfanual                        for Preparation of Data B-Maintenance or Test                        2-hlanual Scram.                  Entry Sheets for Licensee C-Rcfucling                                  3-Automatic Scram.                Event Rcport (LER) File (NUREG-D-Regulatory Restriction                    4-Other (Explain)                0161)
E-Operator Training & License Examination F-Administrative G.Operational Error (Explain)
REV. 4/SS 4949        El-Other (Explain)                                                            Exhibit  1 - Same Source
 
NARRATXVE SVMIEMY OP OPERATING EXPERIENCE DOCKET NO:  50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: J ne 6 1995 COMPLETED BY:
John Walden TELEPHONE:  315  524-4446 Ext. 588 MONTH  Ma    1995 On March 26,  the unit was taken  off line  as scheduled for its annual maintenance and refueling outage. The unit. was placed on line on May 4. Total outage duration was 39.1 days. Average power for the month following power ascension was 974.


==Dear Sir:==
        "E J
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of May, 1995.Very truly yours, s h A.Wid ant Manager JAW:tjn Attachments c: Mr.Thomas T.Martin NRC (1)I'7506200025 9'50531 PDR'ADOCK 05000244 R PDR ZpPf I OPERATING DATA REPORT COMPLETED BY Jun 6 1995 50-244 John V.Walden TELEPHONE (315)5244446 Ext.588 1.Unit Name: R.E.GINNA NUCLEAR POWER PLANT 2.Reporting Period: Ma 1995 3.Licensed Thermal Power (MWt): 1520 4.Nameplate Rating (Gross MWe): 490 5.Design Electric Rating (Net MWe): 470 6.Maximum Dependable Capacity (Gross MWe): 490 7.Maximum Dependable Capacity (Net MWe): 470 8., if Changes Occur in Capacity Rating (items Number 3 Through 7)Since Last Report, Give Reason: 9.Power Level to Which Restricted, If Any (Net MWe: 10.Reason For Restrictions, If An: This Month Yr.-to-Date Cumulative 11.Hours in Reported Period 12.Number of hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor (%)20.Unit Availability Factor (%)21.Unit Capacity Factor (using MDC Net)(%)22.Unit Capacity Factor (using DER Net)(%)23.Unit Forced Outage Rate (%)744.0 690.2 0.0 658.3 0.0 934804.0 316061.0 300318.0 88.5 88.5 85.9 85.9 0.0 3623.0 2746.5 0.0.2685.3 0.0 3942688.0 1333378.0 1267669.0 74.1 74.1 74.4 74.4 0.0 223631.0 178562.2 1687.6 175657.6 8.5 249457925.0 82567430.0 78376899.0 78.5 78.6 75.7 75.7 5.6 24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): Refuelin and Maintenance Started 3/26/95 Finished 5/4/95 Duration 39 da 25.If Shutdown At End of Report Period.Estimate Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):
              '2 0 ~
Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION*CUMULATIVE TOTAL COMMENCING JANUARY 1.1975 CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.Ginna Nuclear Power Plant DATE: June 6 1995 COMPLETED BY: John Walden TELEPHONE:
1 e ~   ~
315 524-4446 Ext.588 MONTH Ma 1995 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)DAY AVERAGE DAILY POWER LEVEL (MWe-Net)17.474 2~18.474 3.19.474 4.36 20.475 5.211 21.475 6.404 22.474 7.448 23'75 8.474 24.475 9.474 25.475 10.475 26.475 475 27.475 12;475 28.476 13.475 29.476 14.475 30.475 15.474 31.475 16.474 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.'ompute to the nearest whole megawatt.
4}}
DOCKET NO.~0-244 UNlTNAhlE R.E.GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS COh)PLETl:D BY V g hn V.Walden TELEPlIONf(3l5)524-4446 Ext.588 No.Date 0 I c 0 0 I 0 0 X.'~rI4 c 0 0 0 I 0I>>0 c v 0>>0 0 In C 0 O Licensee Event Report II Em 0 0 0 cA (J c 0 IA 0 c 0 0 0 O Cause&Corrective Action to Prevent Recurrence 5-03 3/26/95 S 937.7 Continuation of Annual Refueling Shutdown 1 F: Forced S: Scheduled REV.4/SS 4949 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Rcfucling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G.Operational Error (Explain)El-Other (Explain)hletbod: 1 hhfanual 2-hlanual Scram.3-Automatic Scram.4-Other (Explain)Fxhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER)File (NUREG-0161)Exhibit 1-Same Source NARRATXVE SVMIEMY OP OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.Ginna Nuclear Power Plant DATE: J ne 6 1995 COMPLETED BY: John Walden TELEPHONE:
315 524-4446 Ext.588 MONTH Ma 1995 On March 26, the unit was taken off line as scheduled for its annual maintenance and refueling outage.The unit.was placed on line on May 4.Total outage duration was 39.1 days.Average power for the month following power ascension was 974.
"E J'2 0~1 e~~4}}

Revision as of 17:16, 29 October 2019

Monthly Operating Rept for May 1995 for Ginna NPP.W/950606 Ltr
ML17263B076
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/31/1995
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9506200025
Download: ML17263B076 (7)


Text

RIQRITY PACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET N FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION WALDEN,J.V. Rochester Gas 6 Electric Corp.

WIDAY,J.A. Rochester Gas 6 Electric Corp. P RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for May 1995 for Ginna NP . /950606 ltr ~

DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specks NOTES:License Exp date in- accordance with 10CFR2,2.109(9/19/72). 05000244 p RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD 1 1 JOHNSON,A 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 KTE . 01 1 1 NRR/DISP/PIPB 1 1 NRR/DOPS70ECB 1 1 RGN1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

C U

N NOTE TO ALL RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACTTIIE DOCUWIENT CONTROL DESK, ROOK/ PI.37 (EXT. 504.2083 ) TO ELIAIINATEYOUR 4'AVE~ FRONI DISTRI!3UTION LISTS FOR DOCL'MEN'I'S YOU DON "I'L'ED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

7

~ V l/ized~ y zzz l 1I ~ Ow ~ 1 ~

ZZ::."

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TKI.KPHONK ARKA COOK 7IO 546.2700 GINNA STATION June 6, 1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for May, 1995 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No.'0-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of May, 1995.

Very truly yours, s h A. Wid ant Manager JAW:tjn Attachments c: Mr. Thomas T. Martin NRC (1)

I

'7506200025 9'50531 PDR 'ADOCK 05000244 R PDR ZpPf I

OPERATING DATA REPORT 50-244 Jun 6 1995 COMPLETED BY John V. Walden TELEPHONE (315)5244446 Ext.588

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT
2. Reporting Period: Ma 1995
3. Licensed Thermal Power (MWt): 1520
4. Nameplate Rating (Gross MWe): 490
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Net MWe): 470 8., if Changes Occur in Capacity Rating (items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted, If Any (Net MWe:
10. Reason For Restrictions, If An:

This Month Yr.-to-Date Cumulative

11. Hours in Reported Period 744.0 3623.0 223631.0
12. Number of hours Reactor Was Critical 690.2 2746.5 178562.2
13. Reactor Reserve Shutdown Hours 0.0 0.0 . 1687.6
14. Hours Generator On-line 658.3 2685.3 175657.6
15. Unit Reserve Shutdown Hours 0.0 0.0 8.5
16. Gross Thermal Energy Generated (MWH) 934804.0 3942688.0 249457925.0
17. Gross Electrical Energy Generated (MWH) 316061.0 1333378.0 82567430.0
18. Net Electrical Energy Generated (MWH) 300318.0 1267669.0 78376899.0
19. Unit Service Factor (%) 88.5 74.1 78.5
20. Unit Availability Factor (%) 88.5 74.1 78.6
21. Unit Capacity Factor (using MDC Net) (%) 85.9 74.4 75.7
22. Unit Capacity Factor (using DER Net) (%) 85.9 74.4 75.7
23. Unit Forced Outage Rate (%) 0.0 0.0 5.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuelin and Maintenance Started 3/26/95 Finished 5/4/95 Duration 39 da

25. If Shutdown At End of Report Period. Estimate Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
  • CUMULATIVETOTAL COMMENCING JANUARY 1. 1975 CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: June 6 1995 COMPLETED BY:

John Walden TELEPHONE: 315 524-4446 Ext. 588 MONTH Ma 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

17. 474 2 ~ 18. 474
3. 19. 474
4. 36 20. 475
5. 211 21. 475 6.

7.

8.

404 448 474 22.

23 24.

'75 474 475

9. 474 25. 475
10. 475 26. 475 475 27. 475 12; 475 28. 476
13. 475 29. 476
14. 475 30. 475
15. 474 31. 475
16. 474 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. 'ompute to the nearest whole megawatt.

DOCKET NO. ~0-244 UNlTNAhlE R.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS COh)PLETl:D BY V g hn V. Walden TELEPlIONf( 3l5 ) 524-4446 Ext. 588 I

rI4 0 0I >> c c c v Licensee 0 IA Cause & Corrective 0 c Em c No. Date 0 I0 0 0

0 0>> 0 Event 0 0 0 0 0 0 Action to 0 0 0 Prevent Recurrence I ~

X.' 0 In C Report II cA (J O

0 O

5-03 3/26/95 S 937.7 Continuation of Annual Refueling Shutdown 1

F: Forced Reason: hletbod: Fxhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1 hhfanual for Preparation of Data B-Maintenance or Test 2-hlanual Scram. Entry Sheets for Licensee C-Rcfucling 3-Automatic Scram. Event Rcport (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative G.Operational Error (Explain)

REV. 4/SS 4949 El-Other (Explain) Exhibit 1 - Same Source

NARRATXVE SVMIEMY OP OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: J ne 6 1995 COMPLETED BY:

John Walden TELEPHONE: 315 524-4446 Ext. 588 MONTH Ma 1995 On March 26, the unit was taken off line as scheduled for its annual maintenance and refueling outage. The unit. was placed on line on May 4. Total outage duration was 39.1 days. Average power for the month following power ascension was 974.