{{#Wiki_filter:Osl 9210280094 921009 PDR ADOCK 0500040 P PD R CAROLINA POWER&LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT PLANT OPERATING MANUAL VOLUME 3 PART 9 PROCEDURE TYPE'perations Surveillance Test OST-1083 TITLE'SFAS Train"A" Slave Relay Test 18 Months Interval Modes 5 and 6 REVISION 3 HNP 00CUMKMTCGMTRQ.
{{#Wiki_filter:9210280094 921009 PDR ADOCK 0500040 Osl                                                    P PD R CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT PLANT OPERATING MANUAL VOLUME 3 PART 9 PROCEDURE TYPE'perations                 Surveillance Test OST-1083 TITLE 'SFAS                     Train "A" Slave Relay Test 18 Months Interval Modes 5 and 6 REVISION 3 HNP 00CUMKMTCGMTRQ.
NOTE: This procedure has been screened in accordance with PLP-100 AQ criteria and determined to be a Case II procedure.
NOTE: This procedure has been screened in accordance with       PLP-100           AQ criteria and determined to be a Case II procedure.       This procedure requires POD or Outage meeting, SubUnit Manager, or     higher,           3 )
This procedure requires POD or Outage meeting, SubUnit Manager, or higher, 3)evaluation as to level of management required to be involved in preparations and conduct of this test.~FFFl>~E APR)6 Ml APPROVED: xgna re~~J Date TITLE: MANAGER-OPERATIONS HNP CONTROLLED COPY P~Page 1 of 52 OS1 List of Effective Pa es~Pa e Revision 1, 2 3, 4 5, 5a 6-52~~~~\I~~I~~AC-3/1~.~.AC-3/1 3 OST-1083 Rev.3 Page 2 of 52 OS1 1.0 PURPOSE , The purpose of this procedure is to test the operability of the slave relays of the Solid State Protection System using the Go Circuits.This test will be performed every 18 months during refueling and during each cold shutdown greater than 72 hours unless the relay has been tested within the previous 92 days.This procedure satisfies the requirements of Technical Specifications 4.3.2', Table 4.3-2, Steps l.b, 3.a.2, 3.a.3, 3.c.3, 5.c, 6.d, 6g, 7.a, 7.b, 8.a, and 8.b for Train A.ESFAS Slave Relay Response testing via OST's 1809, 1812, and 1825 or 1826 fulfills the requirements of this test.
evaluation as to level of management required to be       involved in preparations and conduct of this test.
                                                ~FFFl >~E APR ) 6     Ml APPROVED:
xgna     re                               Date
                                  ~~J TITLE:                 MANAGER - OPERATIONS HNP CONTROLLED COPY         P~                   Page 1 of 52


==2.0 REFERENCES==
OS1 List of Effective Pa es
~Pa  e                                            Revision 1,  2                                             AC-3/1 3, 4 5, 5a                          ~  ~ ~  ~ . ~ . AC-3/1 6-52                ~ \ I ~  ~  I ~ ~              3 OST-1083 Rev. 3                              Page 2 of  52


L.Tech.Spec.3.3.2 2.FSAR Section 7.3 3.SD-103, Reactor Protection/Engineered Safety Features Actuation System 4.Procedures:
OS1 1.0  PURPOSE
a.OP-155, Diesel Generator Emergency Power System b.OST-1825, Safety Injection-ESF Response Time Train A c.OST-1812;AFW Isolation-ESF Response Time d.OST-1809, Switchover to Recirc Sump" ESF,Response Time e.OST-1826, Safety Injection-ESF Response Time Train B 5.Drawings: a.Simplified Flow Diagrams 2165-S (1)544, Feedwater System (2)547, Circulating
, The purpose    of this procedure is to test the operability of the slave relays of the Solid State Protection System using the Go Circuits. This test will be performed every 18 months during refueling and during each cold shutdown greater than 72 hours unless the relay has been tested within the previous 92 days.
&Service Water System (3)550, Containment Spray System (4)551, Steam Generator Blowdown System (5)552, Sample System (Nuclear)(6)1303, Chemi'cal&Volume Control System (7)1308, 1309, 1310, Safety Injection System OST"1083 Rev.3 Page 3 of 52 OS1
This procedure satisfies the requirements of Technical Specifications 4.3.2     ',  Table 4.3-2, Steps l.b, 3.a.2, 3.a.3, 3.c.3, 5.c, 6.d, 6g, 7.a, 7.b, 8.a, and 8.b for Train A. ESFAS Slave Relay Response testing via OST's 1809, 1812, and 1825 or 1826 fulfills the requirements of this test.


==2.0 REFERENCES==
==2.0 REFERENCES==
(continued) b.Control Wiring Diagrams 2166-8401 (1)Shs.270, 409, 413, 1206, 1988-Safety Injection (K601)(2)Shs.242, 243, 972, 1211,-Safety Injection (K602)(3)Shs.271, 407, 411, 1207, 2972." Safety Ingectxon (K603)(4)Shs.1204, 1205, 1209, 2286-Safety Injection (K608)(5)Shs.1988, 2639, 2641, 3177-Safety Injection (K610)(6)Shs.1933, 1944,-Loop 1 AFW Isolation (K615)(7)Shs.1934, 1945-Loop 2 AFW Isolation (K616)(8)Shs.1935, 1946-Loop 3 AFW Isolation (K617)(9)Shs.286, 421, 2253, 2254, 2703-Containment Phase A Isolation (K622)(10)Shs.416, 418, 458" Safety Injection (K740)(11)Shs.418, 1039-RWST Lo-Lo Level (K739, K741)(12)Shs.317-Safety Injection (K636)c.Vendor'Drawings.'1)
EBASCO Dwg.1364-46575 Sheets 9, 10, ll (2)EBASCO Dwg.1364-2776 Sheets 16-31 (3)EBASCO.Dwg.1364-46576 Sheets 9, 10, 11 6.Solid State Protection System Equipment Reference Manual-PRL Volume 1.7.Solid State Protection System Equipment Reference Manual-PRL Volume 2.OST-10&3 Rev.3 Page 4 of 52 Osl 3.0 PRERE UISITES 1.Review the Control Room Status File and verify that the systems being tested are aligned in a manner that will support the performance of this test.2.The performance of this OST has been coordinated with other plant evolutions such that the minimum operability requirements of Technical Specifications will continue to be satisfied during the performance of the OST or the appropriate LCO's have been written.3.Any special tools and equipment required per Section 5.0 of this procedure have been obtained.Instrumentation needed for the performance of this test is free of deficiency tags that affect instrument indication.
5.IGC support required for this test has been obtained.6.Electrical Maintenance support required for this test has been obtained.7.-All switches in the Safeguards Test Cabinet are in the"NORMAL" position.CAUTION This procedure involves an infrequent test or evolution with the potential to reduce margins of safety or introduce unwanted transients or accidents if performed incorrectly, depending on the specific plant conditions at the time of the test.Conditions and management involvement are documented on PLP-100-1.
'A 7a.A PLP-100 shift brief has been performed by the applicable level of management,.
8.The Shift Foreman has given permission to perform this OST and all prerequisites are met.Shift Foreman Date OST-1083 Rev.3 Page 5 og 52 r OS1 4.0 PRECAUTIONS AND LIMITATIONS Prior to performing safeguards actuations, plant configuration should be established to allow for minimum disturbance to plant operation (i.e., valve positions, starting of redundant equipment).
OST-1083 Rev.3 Page 5a of 52 AC (


Osl 4.0 PRECAUTIONS AND LIMITATIONS (continued) 2.Before starting a new step, clear all trips and reset any associated alarms, lights and relays unless the procedure specifies otherwise.
L. Tech. Spec. 3.3.2
3.If any response is not as required, stop procedure and immediately notify the Shift Foreman for resolution.
: 2. FSAR  Section 7.3
4.During Solid Plant Operation, steps that isolate charging and/or letdown should not be performed unless the alternate pressure=control methods are readily available and the operators are aware of expected pressure fluctuations.
: 3. SD-103, Reactor Protection/Engineered      Safety Features Actuation System
5.Steps within a procedure section must be completed in the order written before the next section is started.5.0 TOOLS AND E UIPMENT 1.Headsets or Radios (as required),, 2.Voltmeter-Fluke 8600A (or equivalent) 3.Stopwatch-Fischer Model 14-649-5 (or equivalent) 4.Electrical Jumper(s)5.Ronan X-85 Calibrator or equivalent (as required per drained S/G)6.0 ACCEPTANCE CRITERIA 1.For Go Circuit testing, all components listed respond as specified after the slave relay is energized and after it is reset.2.Each device that was activated shall be documented as to the condition left at the completion of the section.7'PROCEDURE STEPS NOTE: To reopen isolation valves after.test, control switch for motor"operated valve must be placed momentarily to the SHUT position, then to OPEN position to reset seal"in relays.The associated flow control valve of the opposite header.gay then also be re-opened.
: 4. Procedures:
OST-1083 Rev.3 Page 6 of 52 Osl 7.1 Train A Safet In'ection-Go Circuit (K601)(continued) 2.Establish phone communications between operations in the Hain Control Room and the Safeguards Test Cabinet.CAUTION At SSPS (A)Output Cabinet multimeter across Terminal TB604 and ground to ensure multimeter.
: a. OP-155, Diesel Generator Emergency Power System
No.1 have an I&C Technician connect a 1 of TB604 and ground and Terminal 2 of no voltage is present which may damage 3.At SSPS (A)Output Cabinet No.1, have an I&C Technician connect a multimeter across terminals 1 and 2 of TB604 and verify contacts 11 and 12 of Output Relay K601 are open.4.Open Protection System Safeguards Test Train"A" Cabinet 2 door and, with Shift Foreman,'s approval, commence slave rel,ay test.5.Coordinate with the diesel operator to prelube the Diesel Generator and energize slave relay K601 by turning test switch S907 clockwise then depressing momentarily.(Test switch will spring return to the normal left-hand position.)
: b. OST-1825, Safety    Injection - ESF Response  Time Train   A
6.Verify the following equipment starts or repositions as follows;a.Diesel Generator 1A STARTS b.1CS-214, CSIP's Miniflow Isolation SHUT c.1SI-248, Accumulator 1C-SA Discharge OPEN d.1SI-1, CSIP's to BIT Isolation OPEN 7~e.1SP-227, S/G 1C-SN Sample CNMT Isol SHUT At SSPS (A)Output Cabinet No.1, have an I&C Technician connect a multimeter across Terminals 1 and 2 of TB604 and verify contacts 11 and 12 of Output Relay K601 are closed.This verifies the DG 1A-SA Breaker 106 trip clrcul t~OST-1083 Rev.3 Page 8 of 52 OS1 7.1 Train A Safet In'ection-Go Circuit (K601)(continued) 8.Position reset switch S921 to RESET.9.Verify the following equipment status'.a.Diesel Generator 1A-SA RUNNING H s ICS-2l4, CSIP's Miniiloe Isolation SHUT c.1SI-248, Accumulator 1C-SA Discharge SHUT d.1SI-1, CSIP's to BIT Isolation OPEN e.1SP-227, S/GP 1C-SN Sample CNHT Isol SHUT 10.At SSPS (A)Output Cabinet No.1, have an 1&C Technician connect a multimeter across terminals 1 and 2 of TB604 and verify contacts 11 and 12 of Output Relay K601 are open.11.Direct the I&C Technician to disconnect the multimeter from terminals 1 and 2 of TB604 in SSPS (A)Output Cabinet No.1.Technician Verifier 12.Secure Diesel Generator 1A-SA per OP-155.13.Realign the following valves as required for plant operations'.
: c. OST-1812;  AFW Isolation   ESF Response  Time
a.1CS-214, CSIP's Miniflow Isolation Final Position Positioner b.1SI-248, Accumulator 1C-SA Discharge Verifier Final Position'ositioner c.1SI-1, CSIP's to BIT Isolation Verifier Final Position Positioner Verifier OST-1083 Rev.3 Page 9 of 52 OS1 7.1 Train A Safet In'ection-Go Circuit (K601)(continued) d.1SP-227, S/G 1C-SN Sample CNMT Isolation Final Position Positioner Verifier e.1SI-248 breaker on MCC 1A21-SA Cub.3D Final Position Positioner Verifier 14.Verify Accumulator 1C-SA is repressurized once discharge valve 1SI-248 is SHUT if depressurized in a previous step.7.2 Train A Safet In'ection-Go Circuit (K602)CAUTION Ensure the CSIP suction valves are aligned properly to maintain adequate suction flow to the pumps during the test.1.Direct the I&C Technician to install jumper between terminals 21 and 35 in ARP"19A (SA)F3 to defeat the SG Low Pressure interlock for 1BD-49 unless already done by OP"183.03.(Ref.2.5.b.2)2~If any Steam Generator level is below 38.5X, direct the 1&C Technician to lift the lead at Terminal 60 in ARP-19A (SA)F3 to defeat the S.G.low level interlock for 1BD-49.3 E Prepare the following equipment for testing as follows.'~b.1CS-291, RWST to CSIP Isolation 1CS-165, VCT Outlet Isolation SHUT OPEN C~d.1CC-114, CCW to Sample HX Isolation 1BD-49, S/G 1C-SN Blowdown CNMT Isol OPEN OPEN e.1CC-304, CCW to Gross Failed Fuel Detector OPEN f.SGWLU pump for C S/G SECURED OST-1083 Rev.3 Page 10 of 52 OS1 7.2 Train A Safet In'ection-Go Circuit (K602)(continued) 4.Have the I&C Technician perform the following steps: a.At SSPS (A)Output Cabinet No.1, verify the voltage between Time Delay Relay TD1 Terminal 6 (+)and Logic Ground (-)is 48+2 VDC.b.At SSPS (A)Output Cabinet No.1, verify the voltage between Time Delay Relay TD1 Terminal 2 (+)and Logic Ground (-)is 0+2 VDC.c.At SSPS (A)Logic Cabinet, connect the multimeter between TB505-7 (+)and Signal Ground (-).d.If a Reactor Trip Signal is present as a result of a drained steam generator(s), lift and tape transmitter field leads and install Ronans (transmitter simulator) on the following points to clear the Lo-Lo Level Bistable on the appropriate steam generator(s):
: d. OST-1809, Switchover to Recirc    Sump  " ESF,Response Time
'A'team Generator PIC-2 TBF 10 and 11 PIC-3 TBF 10 and 11'B'team Generator PIC-2 PIC-3 TBF 13 and 14 V TBF 13 and 14'C'team Generator PIC-2 TBF 16 and 17 PIC-3 TBF 16 and 17 e.Adjust Ronan(s)as necessary to clear the Lo-Lo Level Bistables for the appropriate steam generator.
: e. OST-1826, Safety    Injection  ESF Response  Time Train   B
OST-1083 Rev.3 Page 11 of 52 Os 1 7.2 Train A Safet In'ection'-Go circuit (K602)(continued)
: 5. Drawings:
NOTE: To prevent flashing in Sample HX, secure sampling prior to energizing slave relay K602.5.Establish phone communications between operations in the Main Control Room and Safeguards Test Cabinet.a.Close then reopen the Reactor Trip Beakers as needed to reset the P-4 interlock.
: a. Simplified Flow  Diagrams 2165-S (1)   544, Feedwater System (2)   547, Circulating  & Service Water System (3)   550, Containment Spray System (4)   551, Steam Generator Blowdown System (5)   552, Sample System (Nuclear)
6.Open Protection System Safeguards Test Train"A" Cabinet 2 door and, with Shift Foreman's approval, commence the slave relay test.7.Simultaneously start a stop watch to time the SI Time Delay Relay and energize slave relay K602 by turning test switch S908 clockwise and depressing momentarily.(Test switch will spring return to the normal left"hand position.)
(6)   1303, Chemi'cal  & Volume Control System (7)   1308, 1309, 1310, Safety    Injection  System OST"1083 Rev. 3                                               Page of 52
NOTES The following two steps must be performed within 60 seconds after K602 has been energized to verify SI will not reset.8.Place the Safety Injection Train A Reset Switch to RESET.9.Verify the SI RESET AUTO-SI BLOCKED Light is OFF at Bypass Permissive Light Box (BPLB).10.Veri.fy the following valves reposition as follows: a~1CS"291, RWST to CSIP Isolation OPEN b.C~1CS-165, VCT,Outlet Isolation 1CC-114, CCW to Sample HX Isolation SHUT SHUT d.1BD-49, S/G 1C-SN Blowdown CNMT Isol SHUT e.1CC-304, CCW to Gross Failed Fuel Detector SHUT OST-1083 Rev.3 Page 12 of 52 OS1 7.2 Train A Safet In'ection-Go circuit (K602)(continued) 11.Verify the voltage on the multimeter connected in Step 7.2.4 increases to 48+2 VDC one minute+3 Sec.after slave relay K602 is energized.
VDC T'e 12.Place the Safety Injection Train A Reset switch to Reset.13.Verify the voltage on the multimeter connected in Step 7.2.4 decreases to 0+2 VDC.VDC 14.Verify the SI RESET AUTO-SI BLOCKED Light is ON at Bypass Permissive Light Box (BPLB).15.Position Test Switch S921 to Reset.16.Verify the following valve status.'.1CS-291, RWST to CSIP Isolation OPEN b.1CS-165, VCT Outlet Isolation c.1CC-114, CCW to Sample HX Isolation SHUT SHUT d.1BD-49, S/G 1C-SN Blowdown CNMT Isol SHUT e.1CC-304, CCW to Cross Failed Fuel Detector SHUT 17.Direct the I&C Technician to disconnect the multimeter connected in Step 7.2.4.Technician Verifier 18.Direct the I&C Technician to remove jumper installed in Step 7.2.1 unless required by OP-183.03.
Technician Verifier OST-1083 Rev.3 Page 13 of 52  


OS1 7.2 Train A Safet Iniection-Go circuit (K602)(continued) 19.Direct the I&C Technician to reconnect the lead lifted in Step 7.2.2 (Mark this step NA if Section 7.3 is to be performed next)..echnician Verifier 20.Reposition the following valves as required for plant operations:
OS1
CAUTION 1CS-165, VCT Outlet Isolation, must be reopened before closing 1CS-291, RWST to CSIP Isolation, to prevent losing suction to the CSIP's.a.1CS-165, VCT Outlet Isolation Final Position Positioner b.1CS-291, RWST to CSIP Isolation Verifier Final Position Positioner c.1CC-114, CCW to Sample HX Isolation Verifier Final Position Positioner Verifier d.1BD-49, S/G 1C-SN BLovdovn CNMT Isolation Final Position Positioner Verifier e.1CC-304, CCW to Cross Failed Fuel Detector Final Position Positioner Verifier 21.Return the SGWLU System to desired lineup per OP-183.03.
OST"1083 Rev.3 Page 14 of 52 OS1 7.2 Train A Safet In'ection-Go Circuit (K602)(continued) 22.Remove Ronans and land leads lifted in Step 7.2.4.d on the appropriate points: 'A'team Generator PIC-2 TBF 10 and 11 TECHNICIAN VERIFIER PIC-3 TBF 10 and 11 TECHNICIAN
'B'team Generator VERIFIER PIC-2 TBF 13 and 14 TECHNICIAN VERIFIER PIC-3 TBF 13 and 14 TECHNICIAN
'C'team Generator VERIFIER PIC-2 TBF 16 and 17 TECHNICIAN PIC-3 TBF 16 and 17 VERIFIER TECHNICIAN 7.3 Train A Safet In ection-Go Circuit (K603)VERIFIER CAUTION The following test isolates the normal charging line.1.Direct the I6C Technician to install jumper between terminals 44 and 58 in ARP-19A (SA)F3 to defeat the SG Low Pressure interlock for 1BD-11 unless already done by OP-183.01.(Ref.2.5.b.3)OST-1083 Rev.3 Page 15 of 52 Os 1 7.3 Train A Safet In'ection-Go Circuit (K603)(continued) 2.If any Steam Generator level is below 38.5X, direct the I&C Technician to lift the lead at terminal 60 in ARP-19A (SA)F3 to defeat the S.G.low level interlock for 1BD-11 (Mark this step NA if.the lead was not reconnected in Section 7.2).-3.Prepare the following equipment for testing as follows'.a~b.1CS-238, Charging Line Isolation 1SI-4, BIT Outlet Isolation OPEN SHUT C~1SI-246, Accumulator 1A-SA Discharge SHUT d.1SI-246, Control Switch SHUT e.1BD-11, S/G 1A-SN Blowdown Isolation OPEN 1SI-246 Breaker on MCC 1A21-SA Cob.e SC SHUT g~h.1~1SI-1, CSIP's to BIT Isolation 1SI-2, CSIP's to BIT Isolation SGWLU pump for A SIG SHUT SHUT SECURED j.Train A Ventilation'.
(1)3CZ-B1(SA-1), CR Norm Intake (MCB)OPEN (2)3CZ-B3(SA-1), CR Norm Exh (MCB)OPEN (3)E-9(1A-SA), Normal Exhaust Fan ON (MCB)(4)3CZ-BS(SA-l), Equip Prot Room Air OPEN (AEP-1)Inlet Vlv (5)(6)3CZ-B7(SA"1), Elec Equip Prot Room OPEN (AEP-1)Vent Isol L 3AC-D4(SA-~)s RAB Swgr Rm A Ret SHUT (AEP-1)Air Damper (7)E-28(1A-SA), Swgr Rm A Exh Fan ON (AEP-1)OST-1083 Rev.3 Page 16 of 52 Osl 7.3 Train A Safet In'ection-Co Circuit (K603)(continued)
(8)E-28(1B-SA), Swgr Rm A Exh Fan ON (AEP-1)(9)3AC-D3(SA-1), Swgr Rm.A OAI 1st 1 OPEN (AEP-', SLB-11)(10)E-10(1A-SA), Elec Equip Rm Exh Fan ON (A P-1)(11)3CZ-Bll(SA-1), CR Em Filt OAI Vlv OPEN (MCB)(12)3CZ"B9(SA-1)
CR Em Filt OAI Vlv (MCB)OPEN (13)R-13(l&2A-NNS), ARR For Comp/Comm OFF (AEP-3)Rm (14)R-13(1&2B-NNS)
ARR For Comp/Comm Rm (AEP-3)OFF (15)CK-B7-1&2, Comp Rm Normal Intake OPEN (AEP-3)(16)CK"B8-1&2, Comp Rm Normal Intake OPEN (AEP-3)(17)3CZ-D16(SA"1), CR EM Filt Recirc SHUT (MCB)NOTE: Accumulator 1A-SA must be depressurized or at the same pressure as the RCS to prevent injection of water into the loops.If necessary, use 1SI"295 and 1SI-298 to reduce the pressure in the accumulator.
4.Verify Accumulator 1A"SA pressure is less than or equal to RCS pressure.5 Establish phone communications between operations in the Main Control Room and the Safeguards Test Cabinet.6.Open Protection System Safeguards Test Train"A" Cabinet 2 door and, with Shift Foreman's approval, commence the slave relay test.OST-1083 Rev.3 Page 17 of 52 Osl 7.3 Train A Safet In'ection-Go Circuit (K603)(continued) 7.Energize slave relay K603 by turning test switch S909 clockwise and depressing momentarily.(Test switch will spring return to the normal left-hand position.)
8.Verify the equipment, realigns as follows: a~b.C~e.1CS-238, Charging Line Isolation 1SI-4, BIT Outlet Isolation 1SI-246, Accumulator 1A-SA Discharge 1BD-11, S/G lA"SN Blowdown Isolation Train A Ventilation:
SHUT OPEN OPEN SHUT (1)3CZ-B1(SA-l), CR Norm Intake (MCB)(2)3CZ-B3(SA-1), CR Norm Exh (MCB)(3)E-9(1A-SA)
Normal Exhaust Fan (MCB)SHUT SHUT OFF (4)3CZ-B5(SA-1), Equip Prot Room Air SHUT (AEP-1)Inlet Vlv (5)3CZ-B7(SA-1), Elec Equip Prot Room SHUT (AEP-1)Vent Isol (6)3AC-D4(SA-1), RAB Swgr Rm A Ret (AEP-1)Air Damper (7)E-28(lA-SA), Swgr Rm A Exh Fan (AEP-1)(8)E-28(1B-SA), Swgr Rm A Exh Fan (AEP-1)OPEN OFF OFF (9)3AC-D3(SA-1), Swgr Rm A OAI Isol (AEP-l, SLB-11)(10)E-10(lA-SAQ, Elec Equip Rm Exh Fan (AEP-1)(ll)3CZ-Bll(SA-1), CR Emer Filt OAI (MCB)Vlv SHUT OFF SHUT OST-1083 Rev.3 Page 18 of 52


OS1 7.3 Train A Safet in'ection-Go Circuit (K603)(continued)
==2.0  REFERENCES==
(12)3CZ-B9(SA-1), CR Emer Filt OAI Vlv SHUT (MCB)(13)R-13(l&"A-NNS), ARR For Comp/Comm ON (AEP-3)Rm (14)R-13(1&2B-NNS), ARR For Comp/Comm ON (AEP-3)Rm (15)CK-B7-1&2, Comp Rm Normal Intake SHUT (AEP-3)(16)CK-B8-1&2, Comp Rm Normal Intake SHUT (AEP-3)(17)3CZ-D16(SA-1), CR Em Filt Recirc OPEN (MCB)9.Position reset svitch S921 to RESET.10.Reset the Control Room Isolation Signal ll.Prepare following equipment for testing as follows'.a.Train A ventilation (1)CK-B6 (1&2), Smoke Pur In Comp Rm OPEN (AEP-3)(2)ES-7(1&2-NNS), Smoke Pur Exh Fan ON (AEP"3)(3)ES-1A, Purge Exhaust Fan (MCB)ON (4)3CZ-B17(SA-1), CR Purge Makeup Vlv OPEN (MCB)(5)3CZ-B13(SA-1), CR Purge Exh (MCB)OPEN 12.Energize slave relay K603 by turning test switch S909 clockwise and depressing momentarily.(Test svitch vill spring return to the'Normal left-hand position).
(continued)
OST-1083 Rev.3 Page 19 of 52 OSl 7.3 Train A Safet In'ection-Go Circuit (K603)(continued) 13.Verify the following equipment realigns as follows: a.Train A ventilation (1)CK-B6 (1&2), Smoke Pur In Comp Rm SHUT (2)ES-7(1&2-NNS), Smoke Pur Exh Fan OFF (3)ES-lA, Purge Exhaust Fan OFF (4)3CZ-B17(SA-1), CR Purge Makeup Vlv SHUT (5)3CZ-B13(SA-1), CR Purge Exh 14.Position reset switch S921 to RESET.SHUT 15.Verify the following equipment status: b.C~1CS-238, Charging Line Isolation 1SI-4, BIT Outlet Isolation 1SI-246, Accumulator lA-SA Discharge SHUT OPEN SHUT d.e.1BD-'ll, S/G 1A-SN Blowdown Isolation SHUT Train A Ventilation (1)3CZ-Bl(SA-1), CR Norm Intake (MCB)(2)3CZ-B3(SA-1), CR Norm Exh (MCB)SHUT SHUT (3)E-9(1A-SA), Normal Exhaust Fan (MCB)(4)3CZ-B5(SA-1), Equip Prot Rm Air (AEP"1)Inlet Vlv (5)3CZ-B7(SA-l), Elec Equip Prot Rm (AEP-1)Vent Isol I (6)3AC-D4(SA-1')p RAB Swgr Rm A Ret (AEP-1)Damper (7)E"28(lA-SA), Swgr Rm A Exh Fan (AEP-1)OFF SHUT SHUT OPEN OFF OST-1083 Rev.3 Page 20 of 52 OS1 7.3 Train A Safet In'ection-Go Circuit (K603)(continued)
: b. Control Wiring Diagrams 2166-8401 (1)               Shs. 270, 409, 413, 1206, 1988  Safety Injection    (K601)
(8)E-28(1B-SA), Swgr Rm A Exh Fan OFF (AEP-1)3AC-D3(SA-1), Swgr Pw A OAI Isol SHUT (AEP-1, SLB-ll)(10)E"10(1A-SA), Elec Equip Rm Exh Fan OFF (AEP-1)(11)3CZ-B17(SA-1), CR Purge Makeup Vlv SHUT (MCB)(12)3CZ-B11(SA-1), CR Emer Filt OAI SHUT (MCB)Vlv (13)R-13(1&2A-NNS), ARR for Comp/Comm Rm (AEP-3)ON (14)R-13(1&2B-NNS), ARR for Comp/Comm Rm (AEP-3)ON (15)ES-7(l&2X-NNS), Smoke Purge Exh OFF Fan (AEP-3)(16)CK"B7-1&2, Comp Rm Normal Intake SHUT (AEP-3)(17)CK-B8-1&2,Comp Rm Normal Intake SHUT (AEP-3)(18)CK-B6-1&2, Smoke Pur Intake (AEP"3)SHUT (19)(20)SHUT 3CZ-D16(SA-1), CR Em Filt Recirc OPEN (MCB)3CZ"B13(SA-1), CR Purge Exh (MCB)(21)ES-1A, Purge Exhaust Fan (MCB)OFF (22)3CZ-B9(SA"1), CR Emer Filt OAI Vlv (MCB).SHUT 16.Direct the I&C Technician to remove jumper installed in Step.7.3.1 unless required by OP-183.01'echnician Verifier OST-1083 Rev.3 Page 21 of 52 OS1 7.3 Train A Safet Iniection-Go Circuit (K603)(continued) 17.Direct the I&C Technician to reconnect the lead lifted in Step 7.3.2 (Mark this Step NA if Section 7.4 is to be performed next).Techni"ian Verifier 18.Realign the following equipment as required for plant operations', a.1CS-238, Charging Line Isolation Final Position Positioner Verifier b.1SI-4, BIT Outlet Isolation Final Position Positioner Verifier c.1SI-246, Accumulator lA-SA Discharge Final Position Positioner d.1BD-ll, S/G 1A-SN Blowdown Isolation Verifier Final Position Positioner Verifier e.1SI-246 Breaker on MCC 1A21-SA Cub.5C Final Position Positioner Verifier f.Train A Ventilation (1)3CZ-B1(SA-1), CR Norm Intake (MCB)Final Position Positioner Verifier (2)E-9(lA-SA), Normal Exhaust Fan (MCB)Final Position Positioner Verifier OST-1083 Rev.3 Page 22 of 52 OS1 7.3 Train A Safet In ection" Go Circuit (K603)(continued)
(2)               Shs. 242, 243, 972, 1211, Safety        Injection (K602)
(3)3CZ-B3(SA-1), CR Norm Exh (HCB)Final Position Positioner Verifier (4)3CZ-B5(SA-I), Equip Pro" Room Air Inlet Valve (AEP-1)Final Position Positioner Verifier (5)3CZ-B7(SA-l), Elec Equip Prot Rm Vent Isol (AEP-1)Final Position Positioner Verifier (6)3AC-D4(SA"1), RAB SWGR Rm A Ret Air Damper (AEP-1)Final Position Positioner Verifier (7)E-28(1A-SA), SWGR Rm A Exh Fan (AEP-1)Final Position Positioner Verifier (8)E-28(lB-SA), SWGR Rm A Exh Fan (AEP-1)Final Position Positioner Verifier (9)3AC-D3(SA-1), SWGR Rm A OAI Isol (AEP"1, SLB-11)Final Position Positioner Verifier (10)E-10(1A-SA), Elec Equip Rm Exh Fan (AEP-1)Final Position Positioner Verifier (11)3CZ-B17 (SA-1), CR Purge Nakeup Vl v (MCB)Final Position Positioner Verifier OST-1083 Rev.3 Page 23 of 52 Osl 7.3 Train A Safet In ection-Co Circuit (K603)(continued)
(3)               Shs. 271, 407, 411, 1207, 2972.     " Safety Ingectxon (K603)
(12)3"2-811(SA-1), CR Emer Filt OAI Vlv (MCB)Final Position Positioner Verifier (13)R-13(l&2A-NNS), ARR for Comp/Comm Rm (AEP-3)Final Position'ositioner Verifier (14)ES-7(1&2X-NNS), Smoke Pur Exh Fan (AEP-3)Final Position Positioner Verifier (15)CK-B7-1&2, Computer Room Normal Intake (AEP-3)Final Position Positioner Verifier (16)CK-B8-1&2, Computer Room Normal intake (AEP"3)Final Position Positioner Verifier (17)CK-B6-1&2, Smoke Pur Intake (AEP-3)Final Position Positioner (18)3CZ-D16(SA-l), CR Em Filt Recirc (MCB)Verifier Final Position Positioner Verifier (19)3CZ-B13(SA-1), CR Purge Exh (MCB)Final Position Positioner Verifier (20)ES-1A, Purge Exhaust Fan OST-1083 Rev.3 Final Position Positioner Verifier Page 24 of 52 Osl 7.3 Train A Safet In'ection-Go Circuit (K603)(continued)
(4)               Shs. 1204, 1205, 1209, 2286  Safety          Injection (K608)
(21)3CZ"B9(SA-1), CR Emer Filt OAI Vlv Final Position Positioner Verifier (22)R-13(162B)
(5)               Shs. 1988, 2639, 2641, 3177        - Safety Injection (K610)
ARR for Comp/Comm Rm (AEP-3)Final Position Positioner Verifier]9.Verify Accumulator 1A-SA is repressurized once discharge valve 1SI-246 is SHUT if depressurized in a previous step.20.Return the SGMLU System to the desired lineup per OP-183.01.
(6)               Shs. 1933, 1944,   - Loop  1 AFW  Isolation    (K615)
7.4 Train A Safet In'ection-Go Circuit (K608)CAUTION The perEormance of this test diverts the A Train ESM Return Header to the Auxiliary Reservoir.
(7)               Shs. 1934, 1945  Loop    2 AFW  Isolation    (K616)
This test should not be performed if the Circulating Mater System has been recently chlorinated (check with Chemistry to determine restrictions)
(8)               Shs. 1935, 1946  Loop    3 AFW  Isolation    (K617)
OR if the CTMU System is not available for makeup to the cooling tower basin.Maintain maximum makeup Elow and monitor basin level to avoid the cavitation of a Service Water Pump.1.Direct the I&C Technician to install jumper between terminals 93 and 107 in ARP-19A (SA)F3 to defeat the SG Low Pressure interlock Eor 1BD-30 unless already done by OP-183.02.(Ref.2.5.b.2)2.If any Steam Generator level is below 38.5X, direct the ISC Technician to lift the lead at terminal 60 in ARP" 19A (SA)F3 to defeat the SG low level interlock Eor 1BD-30 (Mark this sXep NA if lead not reconnected in Section 7.3)~OST-1083 Rev.3 Page 25 of 52 OS1 7.3 Train A Safet In'ection" Go Circuit (K603)(continued) 3.Prepare the following equipment for testing as fcl.lows: a.1SW-270, ESW Hdr A Return to Aux Rsvr SHUT B s 1BD-30, S/G IE-SN Bloudoun CNHT Isol OPEN c.1SP-222, S/G 1B-SN Sample CNMT Isol OPEN d.1SP-217, S/G 1A"SN Sample CNMT Isol OPEN e.SGWLU pump for B S/G SECURED 4e Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.5.Open Protection System Safeguards Test Train"A" Cabinet 2 door and, with Shift Foreman's approval, commence the slave relay test.NOTE: 1SM-270 will cycle from shut to open then back to shut when K608 is energized.
(9)               Shs. 286, 421, 2253, 2254, 2703      - Containment Phase  A Isolation (K622)
6.Energize slave relay K608 by turning test switch S910 clockwise and depressing momentarily.(Test s~itch will spring return to the normal left"hand position.)
(10) Shs. 416, 418, 458 " Safety Injection (K740)
7.Verify the following valves realign as follows', a.1SM-270, ESM Hdr A Return to Aux Rsvr OPEN THEN SHUT U.IBD-30, S7G IB-SN Bloudoun CNHT Isol SHUT c.1SP-222, S/G 1B-SN Sample CNMT Isol SHUT d.1SP-217, S/G lA-SN Sample CNMT Isol SHUT 8.Position reset switch S921 to RESET.9.Verify the following valve status'.a.1SW-270, ESW Hdr A Return to Aux Rsvr SHUT OST-1083 Rev.3 Page 26 of 52 Osl 7.4 Train A Safet In ection-Go Circuit (K608)(continued) b.1BD-30, S/G 1B"SN Bio+down CNMT Isol SHUT c.1SP-222, S/G 1B-SN Sample CNMT Isol SHUT d.1SP-217, S/G 1A-SN Sample CNMT Isol SHUT 10.Direct the I&C Technician to remove jumper installed in Step.7.4.1 unless required by OP-183.02.
(11) Shs. 418, 1039                  - RWST  Lo-Lo Level (K739, K741)
Technician Verifier 11.Direct the 16C Technician to reconnect the lead lifted in Step 7.4.2.Technician Verifier 12.Reposition the following valves as required for plant operations:
(12) Shs. 317                  Safety    Injection  (K636)
a.1SW-270, ESW Hdr A Return to Aux Rsvr Final Position Positioner Verifier b.1BD-30, S/G 18-SN Blovdown CNMT Isol Final Position Positioner c.1SP-222, S/G 1B-SN Sample CNMT Isol Verifier Final Position Positioner Verifier d.1SP-217, S/G lA-SN Sample CNMT Isol Final Position Positioner Verifier 13.Return the SGWLU System to the desired lineup per OP-183.02.
: c. Vendor'Drawings.'1)
OST-1083 Rev.3 Page 27 of 52 OS1 7.5 Train A Safet In'ection-Go Circuit (K610)1.Prepare the equipment for testing as follows: a.Diesel Generator 1A-SA-Prepare for startup per OP-155 b.1CH-149, Chill Water to NESSR Fan Clrs OPEN c.1CH-197, Chill Water to NESSR Fan Clrs OPEN d.ALB-23-3-7, RAB NORM EXE XBOL DMPR TRBL OPP e.A Train RAB Normal Exhaust Dampers: (1)AV-D3SA-1 (2)AV-D5SA-1 (3)AV-D7SA-1 (4)AV-D9SA-1 (5)AV-D11SA-1 (6)AV-D13SA-1 (7)AV-D15SA-1 (8)AV-D17SA-1 (9)AV"D19SA-1 (10)AV-D21SA-1 (11)AV-D23SA-1 (12)AV"D25SA-1 (13)AV-D27SA-1 (14)AV-D29SA-1 (15)AV-D31SA-1 (16)AV-D33SA-1
EBASCO Dwg. 1364-46575 Sheets    9, 10,   ll (2)               EBASCO Dwg. 1364-2776 Sheets    16-31 (3)               EBASCO. Dwg. 1364-46576 Sheets    9, 10,   11
'17)AV-D35SA-1 (18)AV-D37SA-1 OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OST"1083 Rev.3 Page 28 of 52 OS1 7.5 Train A Safet In ection-Go Circuit (K610)(continued)
: 6. Solid State Protection System Equipment Reference Manual PRL Volume                  1.
(19)AV-D52SA-1 (20)AV-D58SA-1 (21)AV-D62SA-1 (22)AV-D66SA"1 (23)AV-D70SA-1 (24)AV-D74SA-1 (25)AV-D78SA-1 (26)AV-D82SA-1 (27)AV-D86SA-1 OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN 2.Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.3.Open Protection System Safeguards Test Train"A" Cabinet 2 door and, with Shift Foreman's approval, commence the slave relay test.4.Coordinate with the diesel operator to prelube the Diesel Generator and energize slave relay K610 by turning test switch S912 clockvise and depressing momentarily.(Test switch vill spring return to the normal left"hand position.)
: 7. Solid State Protection System Equipment Reference Manual PRL Volume                2.
5'erify the equipment realigns as follows: Diesel Generator 1A-SA STARTS b.C~'d~1CH-149, Chill Water to NESSR Fan Clrs SHUT 1CH-197, Chill Water to NESSR Fan Clrs SHUT ALB-23-3-7, RAB CFORM EXH ISOL DMPR TRBL ON e.OST-1083 Rev.3 A Train RAB Normal Exhaust Dampers: (1)AV-D3SA-1 (2)AV-D5SA-1 SHUT SHUT Page 29 of 52 OS1 7.5 Train A Safet In'ection-Go Circuit (K610)(continued)
OST-10&3 Rev. 3                                                                 Page of 52
(3)AV-D7SA-1 (4)AV-D9SA-1 (5)AV-011SA-1 (6)AV-D13SA-1 (7)AV-D15SA-1 (8)AV"D17SA-1 (9)AV-D19SA-1 (10)AV-D21SA-1 (11)AV-D23SA-1 (12)AV-D25SA-1 (13)AV-D27SA-1 (14)AV-D29SA-1 (15)AV-D31SA-1 (16)AV-D33SA-1 (1/)AV-D35SA-1 (18)AV-D37SA-1 (19)AV-D52SA-1 (20)AV-D58SA-1 (21)AV-D62SA-1 (22)AV-D66SA"1 (23)AV-D70SA-1 (24)AV-D74SA-1 (25)AV-D78SA-.3.
(26)AV-D82SA-1 (27)AV-D86SA-1 6.Position reset switch S921 to RESET.SHUT SHUT SBUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT OST-1083 Rev.3 Page 30 of 52 S
Osl 7.5 Train A Safet In'ection-Go Circuit (K610)(continued) 7.Verify the folloving equipment status'.a.Diesel Generator 1A-SA RlJNN ING b." 1CH-149, Chill Water to NESSR Fan C's SHUT C~1CH-197, Chill Water to.NESSR Fan Clrs SHUT d.ALB-23-3-7, RAB NORM EXH ISOL DMPR TRBL OFF e.A Train RAB Normal Exhaust Dampers: (1)AV-D3SA-1 (2)AV-D5SA-1 (3)AV-D7SA"1 (4)AV"D9SA-1 (5)AV-D11SA-1 (6)AV-D13SA-1 (7)AV-D15SA-1 (8)AV-D17SA-1 (9)AV-D19SA-1 (10)AV-D21SA-1 (11)AV-D23SA-1 (12)AV-D25SA-1 (13)AV-D27SA-1 (14)AV-D29SA-1 (15)AV"D31SA-1 (16)AV-D33SA-1 (17)AV-D35SA~l
': "C.(18)AV-D37SA-1 ,OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN (19)AV"D52SA-1 (20)AV-D58SA-1 OPEN OPEN OST-1083 Rev.3 Page 31 of 52 OS1 7.5 Train A Safet ln'ection-Go Circuit (K610)(continued)
(21)AV-D62SA-1 (22)AV-D66SA-1 (23)AV-D70SA-1 OPEN OPEN OPEN (24)AV-D74SA-'PEN (25)AV-D78SA-1 (26)AV-D82SA-1 (27)AV-D86SA-1 OPEN OPEN OPEN 8.Secure the 1A-SA Diesel Generator per OP-155.9.Return RAB Normal Ventilation to service per OP-172, RAB HVAC System.10.Realign the following equipment as required for plant operations:
a.1CH-149, Chilled Water to NESSR Fan Coolers Final Position Positioner Verifier b.1CH-197, Chilled Water to NESSR Fan Coolers Final Position Positioner Verifier OST-1083 Rev.3 Page 32 of 52 OS1 7.6 Train A Safet In'ection-Go Circuit (K636)CAUTION 1CS-745, CSIP A Alt Miniflow Val.ve, must be CLOSED prior to opening 1CS-746 to prevent lifting the Miniflow Line relief valve.1.Prepare the valves for testing as follows: a.1CS-746, CSIP A Alt Miniflow Valve b.1CS-745, CSIP A Alt Miniflow Valve SHUT SHUT 2~Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.3.Open Protection System Safeguards Test Train"A" Cabinet 2 door and, with Shift Foreman's approval, commence slave relay test.4.Energize slave relay K636 by turning test switch S911 clockwise and depressing momentarily.(Test switch will spring return to the normal left-hand position.)
5.Verify the valves realign as follows.a.1CS-746, CSIP A Alt Miniflow Valve OPEN 6.Position reset switch S921 to RESET.7.Verify the following valve status.a.1CS-746, CSIP A Alt Miniflow Valve OPEN OST-1083 Rev.3 Page 33 of 52 Osl 7,6 Train A Safet Zn ection-Go Circuit (K636)(continued)
CAUTION 1CS-745, CSIP A Alt Miniflow Valve, must be CLOSED prior to opening 1CS-746 to prevent lifting the Miniflow Line relief valve.8.Reposition the following valves as required for plant operations:
a.1CS-745, CSIP 1A-SA Alternate Miniflow Valve Final Position Positioner Verifier b.1CS-746, CSIP lA-SA Alternate Miniflow Valve Final Position Positioner Verifier OST"1083 Rev.3 Page 34 of 52 Os 1 7'Train A Containment Isolation Phase A-Go Circuit (K622)NOTE: The actuation of this slave relay will cause one letdown orifice isolation valve to SHUT.1.Prepare the equipment for testing as follows: a.1CS-9, Letdown Orifice C Isolation OPEN b.1SI-263, Accumulator Test Return Isol OPEN c.1SW-231, NNS CENT Peo Cooler SW Supply OPEN d.1SW-2402 NNS CNMT Fan Cooler SW Return OPEN e.CNMT Fan Coolers: (1)AH-37 (1A-NNS)(2)AH-37 (1B-NNS)(3)AH-38 (1A-NNS)(4)AH-38 (1B-NNS)(5)AH-39 (1A-NNS)(6)AH-39 (18-NNS)ON ON ON ON ON ON 2.Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.NOTE: Monitor CNMT area temperatures and RCP motor and winding temperatures while CNMT Fans are out of service.3~Open Protection System Safeguards Test Train"A" Cabinet 2 door and, with Shift Foreman's approval, commence the slave relay test.4.Energize slave relay K622 by turning test switch S916 clockwise and depressing momentarily.(Test switch will spring return to the normal left-hand position.)
5~Verify the equipment realigns as follows.'.
1CS-9, Letdown Orifice C Isolation SHUT b.1SI-263, Accumulator Test Return Isol SHUT OST-1083 Rev.3 Page 35 of 52 0$1 7.7 Train A Containment Isolation Phase A-Go Circuit (K622)(continued) c.1SW"231>NNS CNMT Fan Cooler SW Supply SHUT d.1SW-240, NNS CNMT Fan Cooler SW Return SHUT e.CNMT Fan Coolers: (1)AH-37 (1A-NNS)(2)AH-37 (1B"NNS)(3)AH-38 (1A-NNS)(4)AH-38 (1B-NNS)(5)AH-39 (1A-NNS)(6)AH-39 (1B-NNS)6.Position reset switch S921 to RESET.OFF OFF OFF OFF OFF OFF 7.Verify the following equipment status'.a~b.C~d.1CS-9, Letdown Orifice C Isolation'HUT 1SI-263, Accumulator Test Return Isol SHUT 1SW-231, NNS CNMT Fan Cooler SW Supply SHUT 1SW"240, NNS CNMT Fan Cooler SW Return SHUT e.CNMT Fan Coolers: (1),AH-37 (1A-NNS)(2)AH-37 (1B-NNS)(3)AH-38 (1A-NNS)(4)AH"38 (1B-NNS)(5)AH-39 (1A-NNS)L~'~(6)AH-39 (1B-NNS)OFF OFF OFF OFF OFF OST-1083 Rev.3 Page 36 of 52 Osl 7.7 Train A Containment Isolation Phase A" Go Circuit (K622)(continued 8.Realign the following equioment as required for plant operations:
a.1CS-9, Letdown Orifice C Isolation Final Positior Positioner Verifier b.1SI-263, Accumulator Test Return Isolation Final Pos tion Positioner Ver'fier c.1SW-231, NNS CNMT Fan Cooler SW Supply Final Position Positioner Verifier d.1SW-240, NNS CNMT Fan Cooler SW Return Final Position Positioner Verifier e.CNMT Coolers: (1)AH"37 (lA-NNS)Final Position Positioner (2)AH"37 (18-NNS)Verifier Final Position Positioner (3)AH-38 (1A-NNS)Verifier Final Position Positioner (4)'H-38 (1B-NNS)Verifier Final Position Positioner
''E.(5)AH-39 (1A-NNS)Verifier Final Position Positioner Verifier OST-1083 Rev.3 Page 37 of 52 0
OS1~7.7 Train A Containment Isolation Phase A-Co Circuit (K622)continued)
(6)AH-39 (1B-NNS)Final.Positior.Positioner Verifier OST-1083 Rev.3 Page 38 of 52 OS1 7.8 Train A Loo 1 AFW Line Isolation-Go Circuit (K615)1.Prepare the valves for testing as follows: a..1AF-137, AFW Pump 1X"SAB to S/G 1A-SN OPEN b.1AF-49, AFW Reg Valve to S/G 1A-SN OPEN 2.Unlock and Shut the.following valves to preven't cold water from being injected to the Steam Generators when Motor Driven Auxiliary Feedwater Pump is running.(NA for pump not to be run)a.1A MDAFW Pump (1)1AF-36, AFWP 1A First Isol.to C S/G.(2)1AF-40, AFWP 1A Isolation to A S/G.b.1B MDAFW Pump (1)1AF-39, AFWP 1B First Isolation to C S/G.(2)1AF-42, AFWP 1B Isol,ation to B S/G.3.Start Aux Feedwater Pump 1A OR 1B (NA pump not used).a.1A MDAFW Pump b.1B MDAFW Pump 4.Establish phone communications between operators the Main Control Room and the Safeguards Test Cabinet.5.Open the Protection System Safeguards Test Train"A" Cabinet 2 door and, with the Shift Foreman's approval, commence the slave relay test.6 Energize slave relay K615 by turning test switch S922 clockwise and'depressing momentarily.(Test switch will spring return to the normal left-hand position.)
OST-1083 Rev.3 Page 39 of 52 Osl 7.8 Train A Loo 1 AFW Line Isolation-Go Circuit (K615)(continued) 7.Verify the valves realign as follows: a.1AF-137, AFW Pump 1X-SAB to S/G 1A-SN SHUT b.1AF-49, AFW Reg Valve to S/G 1A-SN SHUT 8.Release test switch S922 (Test s~itch will spring return to the normal left"hand position).
9.Position reset switch S921 to RESET.10.Realign the following valves as required for plant operations:
a.'AF-137, AFW Pump 1X"SAB to S/G 1A"SN Final Position Positioner b.1AF-49, AFW Reg Valve to S/G 1A-SN Verifier Final Position Positioner Verifier NOTE: Mark the following steps N/A if Section 7.9 is to be performed next.Stop the Aux Feedwater Pump started in Step 3 per OP-137.(NA pump not used)a~lA MDAFW Pump 12.b.1B MDAFW Pump Open and lock open the following valves'(NA valves not shut in Step 2)a.1A MDAFW Pump.(1)1AF-36, AFWP 1A First Isol to C S/G LOCKED OPEN VERIF OST-1083 Rev.3 Page 40 of 52  


OS1 7.8 Train A"Loo 1 AFW Line Isolation-Go Circuit (K615)continued (2)1AF-40, AFWP 1A Isolation to A S/G LOCKED OPEN VERIF b.1B MDAFW Pump (1)1AF-39, AFWP 1B First Isol to C S/G LOCKED OPEN VERIF (2)1AF-42, AFWP 1B Isolation to B S/G LOCKED OPEN VERIF 7.9 Train A Loo 2 AFW Line Isolation-Go Circuit (K616)1.Prepare the valves for testing as follows: a.1AF"143, AFW Pump 1X-SAB to S/G)B-SB OPEN B.1AF-51, AFW ReS Valve te S/G 1B-SB OPEN NOTE: 2~Mark the following 2 steps N/A if this equipment was left in the required lineup in Section 7.8.Unlock and Shut the following valves to prevent cold water from being injected to the Steam Generators when Motor Driven Auxiliary Feedwater Pump is running.(NA for pump not to be run)a~b.1A MDAFW Pump (1)1AF-36, AFWP 1A First Isol.to C S/G.(2)1AF-40, AFWP lA Isolation to A S/G.1B MDAFW Pump (1)1AF-39, AFA'B First Isol.to C S/G.(2)1AF-42, AFWP 1B Isolation to B S/G.OST-1083 Rev.3 Page 41 of 52 Osl 7.9 Train A Loon 2 AFW Line isolation-Go Circuit (K616)(continued 3.Start Aux Feedwater Pump lA OR 1B.(NA pump not used)a.1A MDAFW Pump b.1B MDAFW Pump 4.Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.1 Open the Protection System Safeguards Test Train"A" Cabinet 2 door and, with the Shift Foreman's approval, commence the slave relay test.6, Energize slave relay K616 by turning test switch S923 clockwise and depressing momentarily.(Test switch will spring return to the normal left-hand position.)
Osl 3.0    PRERE UISITES
7.Verify the valves realign as follows: a.1AF-143, AFW Pump 1X-SAB to S/G 1B-SN SHUT B.1AF-51, AFW Reg Valve to S/G 1B-SN SHUT 8.Release test switch S923 (Test switch will spring return to the normal left-hand position).
: 1. Review the Control Room Status File and verify that the systems being tested are aligned in a manner that will support the performance of this test.
9.Position reset s~itch S921 to RESET.10'ealign the following valves as required for plant operations:
: 2. The performance    of this OST has been coordinated with other plant evolutions such that the minimum operability requirements of Technical Specifications will continue to be satisfied during the performance of the OST or the appropriate LCO's have been written.
a.1AF-143, AFW Pump 1X-SAB to S/G 1B-SN Final Position'ositioner E.Verifier b.1AF-51, AFW Reg Valve to S/G 1B-SN Final Position Positioner Verifier OST-1083 Rev.3 Page 42 of 52  
: 3. Any  special tools and equipment required per Section 5.0 of this procedure    have been obtained.
Instrumentation needed for the performance of this test is free of deficiency tags that affect instrument indication.
: 5. IGC  support required for this test has been obtained.
: 6. Electrical  Maintenance support required  for this test  has been obtained.
7.-   All switches in   the Safeguards Test Cabinet are in the "NORMAL"   position.
CAUTION This procedure involves an infrequent test or evolution with the potential to reduce margins of safety or introduce unwanted transients or accidents  if  performed incorrectly, depending on the specific plant conditions at the time of the test. Conditions and management involvement are documented on PLP-100-1.                                       'A 7a. A PLP-100  shift brief  has been performed by the applicable level of  management,.
: 8. The  Shift  Foreman has given permission  to perform this  OST and  all  prerequisites are met.
Shift  Foreman                            Date OST-1083 Rev. 3                                                 Page 5  og 52 r


OS1 7.9 Train A Loo 2 AFW Line Isolation-Go Circuit (616)(continued)
OS1 4.0  PRECAUTIONS AND LIMITATIONS Prior to performing safeguards actuations, plant configuration should be established to allow for minimum disturbance to plant operation (i.e., valve positions, starting of redundant equipment).
NOTE: Mark the following steps N/A if Section 7,10 is'to be performed next.Stop the Aux Feedwater Pump started in Step 3 per OP-137.(NA pump not used)a~b.1A MDAFW Pump 1B MDAFW Pump 12.Open and lock open the following valves'(NA valves not shut in Step 2 of this section or 7.8)a~1A MDAFW Pump (1)1AF-36 AFWP 1A First Isol to C S/G.LOCKED OPEN VERIF (2)1AF-40 AFWP 1A Isolation to A S/G.LOCKED OPEN VERIF b.1B MDAFW Pump (1)1AF-39, AFWP 1B First Isol.to C S/G LOCKED OPEN VERIF (2)1AF-42, AFWP 1B Isolation to B S/G LOCKED OPEN VERIF 7.10 Train A Loo 3 AFW Line Isolation-Go Circuit (K617)1.Prepare the valves Efor testing as follows'.a.1AF-149, AFW Pump 1X-SAB to S/G 1C-SN b.1AF-50, AFW Reg Valve to S/G 1C-SN OPEN OPEN OST-1083 Rev.3 Page 43 of 52 Osl 7.10 Train A Loo 3 AFW Line Isolation-Go Circuit (K617)(continued)
AC OST-1083 Rev. 3                                           Page 5a of 52
NOTE: Mark the following 2 steps N/A if this equ'pment was left in the requireo lineup'n Sr tion 7.9 2.Unlock and Shut the following valves to prevent co'.d water from being inj cted to the Steam Generators when Motor Driven Auxiliary Feedwate" Pump is running.(NA for pump not to be run)a.1A MDAFW Pump (1)lAF-36, AFWP 1A First Isol.to C S/G.(2)1AF-40, AFWP 1A Isolation to A S/G.b.1B MDAFW Pump (1)1AF-39, AFWP 1B First isoi.to C S/U~(2)1AF-42, AFWP 1B Isolation to B S/G.3.Start Aux Feedwater Pump 1A OR 1B.(NA pump not used)a.1A MDAFW Pump b.1B MDAFW Pump 4.Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.5~Open the Protection System Safeguards Test Train"A" Cabinet 2 door and, with Shift Foreman's approval, commence the slave relay test.6.Energize slave relay K617 by turning test switch S924 clockwise and depressing momentarily.(Test switch will spring return to the normal left-hand position.)
(
7.Verify the valves.realign as follows'.t a.1AF-149, AFW Pump 1X"SAB to S/G 1C-SN SHUT b.1AF-50, AFW Reg Valve to S/G 1C-SN SHUT OST-1083 Rev.3 Page 44 of 52 Osl 7.10 Train A Loo 3 AFW Line Isolation-Go Circuit (K617)continued 8.Release test s~itch S924 (Test switch w'll spring return to the normal left-hand position).
9.Position reset switch S921 to RESET.10.Realign the following valves as required for plant operations:
a.1AF-149, AFW Pump 1X-SAB to S/G 1C-SN Final Position Positioner b.1AF-50, AFW Reg Valve to S/G 1C-SN Verifier Final Position Positioner Verifier 11.Stop the Aux Feedwater Pump started in Step 3 per OP-137.(NA pump not used)a.1A MDAFW Pump b.1B MDAFW Pump 12.Open and lock open the following valves: (NA valves not shut in Step 2 of this section or 7.8 or 7.9)a.1A MDAFW Pump (1)lAF-36, AFWP 1A First Isol to C S/G~LOCKED OPEN VERIF.(2)1AF"40, AFWP 1A Isolation to"B" S/G.LOCKED OPEN VERIF.OST-1083 Rev.3 Page 45 of 52 Osl 7.10 Train A Loo 3 AFW Line Isolation-Go Circuit (K617)(continued) b.1B MDAFW Pump (1)lAF-39, AFWP 1B First'Isol.to C S/G.LOCKED OPEN VERIF (2)1AF-42, AFWP 1B Isolation to B S/G.LOCKED OPEN VERIF 7.11 Train A SI for Switchover to Recirculation
-Go Circuit (K739 K740 K741)1.Prepare the equipment for testing as follows: a.b.C~1SI-300, CNMT Sump to RHR Pump A Isol SHUT 1SI-310, CNMT Sump to RHR Pump A Isol SHUT 1CT-105, CNMT Sump to CS Pump A Suet SHUT d.1CT-26, CNMT Spray Pump A Suction SHUT e.RWST/Lo-Lo LVL Bistables on TSLB-4, LB990C, LB991C, LB992C, and LB993C OFF f.CS Pump A Breaker on Emer Bus 1A2"SA Cub.4C RACKED OUT g.1CT-26 Breaker at MCC 1A21-SA Compt.10B.OFF 2~Have a Maintenance Electrician install a jumper across terminals 20 and 24 in MTC 8A-SA Panel 1 to simulate CS Pump breaker closure.CAUTION The water in the CNMT Spray System is contaminated, use appropriate actions in accordance with AP-503 in handling the contaminated fluid.3.Drain Containment Spray System A as follows: OST-1083 Rev.3 Page 46 of 52


Osl 7.11 Train A SI for Switchover to Recirculation
Osl 4.0  PRECAUTIONS AND LIMITATIONS      (continued)
-Go Circuit (K739 K740 K741)(continued) a~Shut or check SHUT the following valves: (1)1CT-50 CNMT SPRAY PUMP A-SA DISCHARGE (2)1CT-47 CNMT SPRAY PUMP A-SA RECIRC (3)1CT-36 CS PUMP A EDUCTOR LINE INLET ISOL (4,)1CT-39 CS PUMP A EDUCTOR LINE OUTLET ISOL b.Open the low point drain at CNMT Spray.Pump (RAB 190): (1)1CT-28 CS PUMP A SUCTION LINE DRAIN (2)1CT-29 CS PUMP A SUCTION LINE DRAIN C~Open the high point vent at CNMT Penetration 23 (RAB 236): (1)1CT-45 SPRAY HDR A TEST CONN (2)1CT-46 SPRAY HDR A TEST CONN Mhen piping is empty, shut the low point drain valves: (1)1CT-28 CS PUMP A SUCTION LINE DRAIN (2)1CT-29 CS PUMP A SUCTION LINE DRAIN Verif.Verif.4.Establish communications between operators in the Main Control Room and the Safeguards Test Cabinet.5.Open Protection System Safeguards Test Train"A" Cabinet 2 door and, with Ship Foreman's approval,'commence the slave relay test.6.Energize slave relay K740 by turning test switch S940 clockwise and depressing momentarily.(Test switch will spring return to the normal left-hand position.)
: 2. Before starting a new step, clear all trips and reset any associated alarms, lights and relays unless the procedure specifies otherwise.
OST-1083 Rev.3 Page 47 of 52 OS1 7.11 Train A SI for Switchover to Recirculation
: 3. If any  response  is not as  required, stop procedure and immediately  notify the Shift    Foreman for resolution.
-Go Circuit (K739 K740 K741)(continued) 7.Verify Bypass Permiss ve Light Panel light 4-8 SI Actuated RHR SUCT will xfer on RWST LO-LO LEVEL illuminates.
: 4. During Solid Plant Operation, steps that isolate charging and/or letdown should not be performed unless the alternate pressure= control methods are readily available and the operators are aware of expected pressure fluctuations.
8.Verify light on SI SUCTION AUTO SWITCH OVER RESET TRAIN A illuminates.
: 5. Steps  within a procedure section must be completed in the order written before the next section is started.
9.Energize slave relay K741 by turning test switcn S941 clockwise and depressing momentarily.(Test switch will spring return to the normal left-hand position.)
5.0  TOOLS AND E UIPMENT
10.Verify the valves realign as follows: a.1SI-300, CNMT Sump to RHR Pump A Isol OPEN b.1CT-105, CNMT Sump to CS Pump A Suet OPEN ll.Realign the valves as follows'.a.1SI-300, CNMT Sump to RHR Pump A Isol SHUT b.1CT"105, CNMT Sump to CS Pump A Suet SHUT 12.Energize slave relay K739 by turning test switch S942 clockwise and depressing momentarily.(Test switch will spring return to the normal left-hand position.)
: 1. Headsets  or Radios (as required),,
13.Verify the valves realign as follows.'.
: 2. Voltmeter    Fluke 8600A (or equivalent)
1SL-310, CNMT Sump to RHR Pump A Isol OPEN b.1CT-105, CNMT Sump to CS Pump A Suet OPEN 14.Realign the valves as follows'.a.1SI"310, CNMT Supp to RHR Pump A Isol SHUT b.1CT-105, CNMT Sump to CS Pump A Suet SHUT 15.Position reset switch S921 to RESET.OST-1083 Rev.3 Page 48 of 52 Os 1 7.11 Train A SI Eor Switchover to Recirculation
: 3. Stopwatch  Fischer Model 14-649-5 (or equivalent)
-Go Circuit (K739 K740 K741)continued 16.Position SI SUCTION AUTO SWITCHOVER RESET TRAIN A switch to RESET.17.VeriEy Bypass Permissive'ight Panel light 4-8 SI ACTUATED RHR SUCT WILL XFER ON RWST LO-L'0 LEVEL extinguishes.
: 4. Electrical Jumper(s)
N 18e Verify light on SI SUCTION AUTO SWITCH OVER RESET TRAIN A extinguishes.
: 5. Ronan X-85    Calibrator or equivalent (as required per drained S/G) 6.0  ACCEPTANCE CRITERIA
19.Have the Maintenance Electrician remove the jumper across terminals 20 and 24 in MTC 8A-SA Panel 1.Electrician Verifier 20.Refill the Containment Spray System A piping as follows: a.b.Turn on power supply MCC 1A21-SA Compt.10B and then open 1CT"26 RWST to CNMT SPRAY PUMP A-SA.breaker ON valve OPEN When a solid water stream flows from the vent, close the following', independent verificatrion is required.c~1CT-45 SPRAY HDR A TEST CONN 1CT-46 SPRAY HDR A TEST CONN Vent the CS Pump A-SA casing.CLOSED CLOSED VENTED d.Vent aEfected instrumentation:
: 1. For  Go  Circuit testing, all    components  listed  respond as specified after the slave relay is energized        and after it is reset.
PI-7120A CSP"SA Suction Pressure PI-7120A CSP"S'A'eduction Pressure PI-7130A CSP-SA Discharge Pressure PI-7131A CSP-SA Discharge Pressure FT-7122A CSP-SA Flow VENTED VENTED VENTED VENTED VENTED OST-1083 Rev.3 Page 49 of 52  
: 2. Each device    that  was activated shall be documented as to the condition    left at the completion of the section.
7 '  PROCEDURE STEPS NOTE:     To reopen    isolation valves after. test, control switch for  motor"operated valve must be placed momentarily to the SHUT position, then to OPEN position to reset seal"in relays. The associated flow control valve of the opposite header.gay then also be re-opened.
OST-1083 Rev. 3                                             Page of 52


OS1 7.11 Train A SI for Switchover to Recirculation
Osl 7.Train   A Safet    In'ection  Go   Circuit (K601) (continued)
-Go Circuit (K739 K740 K741)(continued) 21.Realign the follcwing equipment as required for plant operations:
: 2. Establish    phone communications between operations      in the Hain Control    Room and the Safeguards Test Cabinet.
a.1SI-300, CNMT Sump to RHR Pump A Isol Final Position Positioner Verifier b.1SI-310, CNMT Sump to RHR Pump A Isol Final Position Positioner Verifier c.1CT-105, CNMT to CS Pump A Suet Final Position Positioner d.1CT-26, CNMT Spray Pump A Suction Verifier Final Position Positioner Verifier e.CNMT Spray Pump A Breaker on Emer Bus 1A2-SA Compt.4C Final Position Positioner Verifier f.1CT-36, CS Pump A Eductor Line Inlet Isol Final Position Positioner Verifier g.1CT-39, CS Pump A Eductor Line Outlet Isol Final Position Positioner Verifier 8.0 DIAGRAMS/ATTACHMENTS Attachment I-Calibration Data Attachment II-Certifications and Reviews OST-1083 Rev.3 Page 50 of 52 OSl ATTACHMENT I Calibration Data Page 1 of 1 INST/MODEL 0 DESCRIPTION INST I.D.CPL DUE DATE VOLTMETER STOP MATCH*RONAN*RONAN*RONAN*RONAN*RONAN*RONAN-If required due to Drained S/G OST-1083 Rev.3 Page 51 of 52 Osl'TTACHMENT II-CERTIFICATIONS AND REVIEWS Page'1 of 1 This OST was erformed as a.'eriodic surveillance requirement Post-Maintenance Operability Test Redundant Subsystem Test Plant Conditions.'ST Completed by.Mode: DATE TIME OST Performed B Initials Name (Print)Initials Name (Print)General Comments/Recommendations/Corrective Actions: Pages Used: Fill out Task Sheet OSRM019 if done during refueling.
CAUTION At  SSPS  (A) Output Cabinet No.      1  have an I&C Technician connect a multimeter across Terminal        1 of  TB604 and ground and Terminal 2 of TB604 and ground to ensure        no voltage is present which may damage multimeter.
Fill out Task Sheet OSER019 if done during cold shutdown>72 hours.OST Has Been Satisfactoril
: 3. At SSPS (A) Output Cabinet No. 1, have an I&C Technician connect a multimeter across terminals 1 and 2 of TB604 and verify contacts 11 and 12 of Output Relay K601 are open.
/Unsatisfactoril Com leted: Shift Foreman Date REVIEWED BY: Manager-Shift Operations Date OST-1083 Rev.3 Page 52 of 52}}
: 4. Open    Protection System Safeguards Test Train "A" Cabinet 2  door and, with Shift Foreman,'s approval, commence slave rel,ay test.
: 5. Coordinate with the diesel operator to prelube the Diesel Generator and energize slave relay K601 by turning test switch S907 clockwise then depressing momentarily. (Test switch will spring return to the normal    left-hand position.)
: 6. Verify the following equipment starts or repositions          as follows;
: a.      Diesel Generator    1A                  STARTS
: b.      1CS-214, CSIP's    Miniflow Isolation      SHUT
: c.      1SI-248, Accumulator 1C-SA Discharge      OPEN
: d.      1SI-1, CSIP's to BIT Isolation            OPEN
: e.      1SP-227,  S/G 1C-SN Sample CNMT    Isol  SHUT 7 ~  At SSPS (A) Output Cabinet No. 1, have an I&C Technician connect a multimeter across Terminals 1 and 2 of TB604 and verify contacts 11 and 12 of Output Relay K601 are closed. This verifies the DG 1A-SA Breaker 106 trip clrcul t  ~
OST-1083 Rev.      3                                              Page  8 of  52
 
OS1 7.1  Train  A Safet    In 'ection  Go  Circuit  (K601) (continued)
: 8. Position reset switch      S921  to  RESET.
: 9. Verify the following      equipment status'.
: a. Diesel Generator 1A-SA                  RUNNING H
s    ICS-2l4, CSIP's Miniiloe Isolation          SHUT
: c. 1SI-248, Accumulator 1C-SA Discharge        SHUT
: d. 1SI-1, CSIP's to BIT Isolation              OPEN
: e. 1SP-227,  S/GP 1C-SN Sample    CNHT  Isol  SHUT
: 10. At SSPS (A) Output Cabinet No. 1, have an 1&C Technician connect a multimeter across terminals 1 and 2 of TB604 and verify contacts 11 and 12 of Output Relay K601 are open.
: 11. Direct the I&C Technician to disconnect the multimeter from terminals 1 and 2 of TB604 in SSPS (A) Output Cabinet No. 1.
Technician                    Verifier
: 12. Secure Diesel Generator 1A-SA per OP-155.
: 13. Realign the following valves as required          for plant operations'.
: a. 1CS-214,  CSIP's  Miniflow Isolation Final Position        Positioner          Verifier
: b. 1SI-248, Accumulator 1C-SA Discharge Final Position  'ositioner                Verifier
: c. 1SI-1, CSIP's to BIT Isolation Final Position        Positioner          Verifier OST-1083 Rev. 3                                                Page  9 of 52
 
OS1 7.1  Train  A  Safet    In'ection    Go  Circuit  (K601) (continued)
: d. 1SP-227,  S/G 1C-SN Sample      CNMT Isolation Final Position          Positioner        Verifier
: e. 1SI-248 breaker on      MCC  1A21-SA Cub. 3D Final Position          Positioner        Verifier
: 14. Verify Accumulator 1C-SA is repressurized          once discharge valve 1SI-248 is SHUT if depressurized in          a previous step.
7.2  Train  A  Safet    In'ection    Go  Circuit  (K602)
CAUTION Ensure the CSIP suction valves are aligned properly to maintain adequate suction flow to the pumps during the test.
: 1. Direct the I&C Technician to install jumper between terminals 21 and 35 in ARP"19A (SA)F3 to defeat the            SG Low  Pressure interlock for 1BD-49 unless already done by OP"183.03. (Ref. 2.5.b.2) 2~    If any  Steam Generator level is below 38.5X, direct the 1&C  Technician to    lift  the lead at Terminal 60 in ARP-19A  (SA) F3 to defeat the S.G. low level interlock for 1BD-49.
3 E  Prepare the following equipment        for testing  as  follows.'
              ~  1CS-291,  RWST  to  CSIP  Isolation          SHUT
: b. 1CS-165, VCT Outlet      Isolation            OPEN C~    1CC-114,  CCW  to Sample    HX  Isolation      OPEN
: d. 1BD-49, S/G 1C-SN Blowdown        CNMT  Isol    OPEN
: e. 1CC-304,  CCW  to Gross Failed Fuel Detector                                        OPEN
: f. SGWLU pump    for  C S/G                    SECURED OST-1083 Rev. 3                                                    Page  10  of 52
 
OS1 7.2  Train  A Safet    In'ection -  Go  Circuit (K602) (continued)
: 4. Have the I&C    Technician perform the following steps:
: a. At  SSPS  (A) Output Cabinet No. 1,  verify the voltage between Time Delay Relay TD1 Terminal      6 (+)
and Logic Ground (-) is 48 + 2 VDC.
: b. At  SSPS  (A) Output Cabinet No. 1,    verify the voltage between Time Delay Relay TD1 Terminal      2 (+)
and Logic Ground (-) is 0 + 2 VDC.
: c. At  SSPS  (A) Logic Cabinet, connect the multimeter between TB505-7 (+) and Signal Ground      (-).
: d. If a  Reactor Trip Signal is present as a result of a  drained steam generator(s),    lift and tape transmitter field leads and install Ronans (transmitter simulator) on the following points to clear the Lo-Lo Level Bistable on the appropriate steam generator(s):
                            'A'team  Generator PIC-2        TBF 10 and 11 PIC-3        TBF 10 and 11
                            'B'team  Generator PIC-2        TBF 13 and 14 V
PIC-3        TBF 13 and 14
                            'C'team  Generator PIC-2        TBF 16 and 17 PIC-3        TBF 16 and 17
: e. Adjust Ronan(s) as necessary to clear the Lo-Lo Level Bistables for the appropriate steam generator.
OST-1083 Rev. 3                                              Page  11 of  52
 
Os 1 7.2  Train  A  Safet  In 'ection '- Go  circuit  (K602) (continued)
NOTE:      To  prevent flashing in Sample HX, secure sampling prior to energizing slave relay K602.
: 5. Establish phone communications between operations              in the Main Control Room and Safeguards Test Cabinet.
: a. Close then reopen the Reactor Trip Beakers as needed  to reset the P-4 interlock.
: 6. Open  Protection System Safeguards Test Train "A" Cabinet 2  door and, with Shift Foreman's approval, commence the slave relay test.
: 7. Simultaneously start a stop watch to time the SI Time Delay Relay and energize slave relay K602 by turning test switch S908 clockwise and depressing momentarily.
(Test switch will spring return to the normal left"hand position.)
NOTES      The  following  two steps must be performed      within  60 seconds    after  K602 has  been energized to    verify  SI  will not reset.
: 8. Place the Safety      Injection Train    A Reset Switch to RESET.
: 9. Verify the SI    RESET AUTO-SI BLOCKED    Light is    OFF  at Bypass Permissive      Light  Box (BPLB).
: 10. Veri.fy the following valves reposition        as  follows:
a ~    1CS"291,  RWST  to CSIP  Isolation            OPEN
: b. 1CS-165, VCT,Outlet      Isolation              SHUT C ~    1CC-114,  CCW  to Sample  HX  Isolation        SHUT
: d. 1BD-49, S/G 1C-SN Blowdown      CNMT  Isol      SHUT
: e. 1CC-304,  CCW  to Gross Failed Fuel Detector                                        SHUT OST-1083 Rev. 3                                                    Page  12 of  52
 
OS1 7.2  Train  A  Safet  In'ection -    Go  circuit          (K602) (continued)
: 11. Verify the voltage    on the multimeter connected in Step 7.2.4 increases to 48 + 2 VDC one minute + 3 Sec. after slave relay K602 is energized.
VDC                                        T'e
: 12. Place the Safety Injection Train                A Reset switch to Reset.
: 13. Verify the voltage    on the  multimeter connected in Step 7.2.4 decreases    to  0 + 2 VDC.
VDC
: 14. Verify the  SI RESET AUTO-SI BLOCKED              Light is  ON at Bypass Permissive Light Box (BPLB).
: 15. Position Test Switch      S921  to Reset.
: 16. Verify the following valve      status.'.
1CS-291, RWST  to  CSIP  Isolation                  OPEN
: b. 1CS-165, VCT Outlet    Isolation                    SHUT
: c. 1CC-114,  CCW  to Sample            HX Isolation      SHUT
: d. 1BD-49, S/G 1C-SN Blowdown              CNMT  Isol    SHUT
: e. 1CC-304,  CCW  to Cross Failed Fuel Detector                                              SHUT
: 17. Direct the  I&C  Technician to disconnect the multimeter connected in Step 7.2.4.
Technician                                      Verifier
: 18. Direct the I&C Technician to remove jumper installed in Step 7.2.1 unless required by OP-183.03.
Technician                                    Verifier OST-1083 Rev. 3                                                        Page  13 of 52
 
OS1 7.2  Train  A  Safet  Iniection    Go circuit  (K602) (continued)
: 19. Direct the I&C Technician to reconnect the lead lifted in Step 7.2.2 (Mark this step NA if Section 7.3 is to be performed next).
                .echnician                            Verifier
: 20. Reposition the following valves      as  required for plant operations:
CAUTION 1CS-165, VCT Outlet Isolation, must be reopened before closing 1CS-291, RWST to CSIP Isolation, to prevent losing suction to the CSIP's.
: a. 1CS-165, VCT  Outlet Isolation Final Position        Positioner          Verifier
: b. 1CS-291,  RWST  to  CSIP Isolation Final Position        Positioner          Verifier
: c. 1CC-114,  CCW  to  Sample HX  Isolation Final Position        Positioner          Verifier
: d. 1BD-49, S/G 1C-SN BLovdovn    CNMT  Isolation Final Position        Positioner          Verifier
: e. 1CC-304,  CCW  to Cross Failed Fuel Detector Final Position        Positioner          Verifier
: 21. Return the  SGWLU  System to desired    lineup per OP-183.03.
OST"1083 Rev. 3                                                Page 14 of 52
 
OS1 7.2  Train  A Safet  In 'ection -  Go  Circuit  (K602) (continued)
: 22. Remove Ronans    and land leads  lifted in  Step 7.2.4.d on the appropriate points:
                              'A'team  Generator PIC-2        TBF 10 and 11 TECHNICIAN                        VERIFIER PIC-3        TBF 10 and  11 TECHNICIAN                        VERIFIER
                              'B'team  Generator PIC-2        TBF 13 and 14 TECHNICIAN                        VERIFIER PIC-3        TBF 13 and 14 TECHNICIAN                        VERIFIER
                              'C'team  Generator PIC-2        TBF 16 and 17 TECHNICIAN                        VERIFIER PIC-3        TBF 16 and 17 TECHNICIAN                        VERIFIER 7.3  Train  A Safet  In ection -  Go  Circuit  (K603)
CAUTION The  following test isolates the normal charging line.
: 1. Direct the I6C Technician to install jumper between terminals 44 and 58 in ARP-19A (SA)F3 to defeat the          SG Low Pressure    interlock for  1BD-11 unless    already done by OP-183.01. (Ref. 2.5.b.3)
OST-1083 Rev. 3                                                  Page 15  of 52
 
Os 1 7.3    Train  A Safet  In'ection -  Go  Circuit  (K603) (continued)
: 2. If any  Steam Generator level is below 38.5X, direct the I&C Technician to    lift  the lead at terminal 60 in ARP-19A (SA) F3 to defeat the S.G. low level interlock for 1BD-11 (Mark this step NA if. the lead was not reconnected    in Section 7.2).
    -
: 3. Prepare the following equipment        for testing  as  follows'.
a ~  1CS-238,  Charging Line    Isolation          OPEN
: b. 1SI-4, BIT Outlet Isolation                    SHUT C ~  1SI-246, Accumulator 1A-SA Discharge          SHUT
: d. 1SI-246, Control Switch                        SHUT
: e. 1BD-11, S/G 1A-SN Blowdown      Isolation    OPEN 1SI-246 Breaker on    MCC  1A21-SA Cob.e SC  SHUT g ~  1SI-1, CSIP's to BIT Isolation                SHUT
: h. 1SI-2, CSIP's to BIT Isolation                SHUT 1 ~  SGWLU pump  for  A SIG                    SECURED
: j. Train  A  Ventilation'.
(1)  3CZ-B1(SA-1),    CR  Norm  Intake        OPEN (MCB)
(2)  3CZ-B3(SA-1),    CR  Norm Exh            OPEN (MCB)
(3) E-9(1A-SA), Normal Exhaust        Fan      ON (MCB)
(4)  3CZ-BS(SA-l), Equip Prot      Room  Air  OPEN (AEP-1)          Inlet Vlv (5)  3CZ-B7(SA"1), Elec Equip Prot      Room OPEN (AEP-1)          Vent Isol L
(6)  3AC-D4(SA-~)s    RAB Swgr Rm A    Ret    SHUT (AEP-1)          Air Damper (7)  E-28(1A-SA), Swgr    Rm  A Exh Fan      ON (AEP-1)
OST-1083 Rev. 3                                                    Page 16 of  52
 
Osl 7.3  Train  A  Safet  In 'ection -  Co Circuit  (K603) (continued)
(8)  E-28(1B-SA), Swgr    Rm A  Exh Fan      ON (AEP-1)
(9)  3AC-D3(SA-1), Swgr    Rm. A OAI  1st 1  OPEN (AEP-', SLB-11)
(10) E-10(1A-SA), Elec Equip    Rm  Exh Fan ON (A P-1)
(11) 3CZ-Bll(SA-1),  CR Em  Filt  OAI Vlv  OPEN (MCB)
(12) 3CZ"B9(SA-1)  CR Em  Filt OAI  Vlv (MCB)                                  OPEN (13) R-13(l&2A-NNS),  ARR  For  Comp/Comm  OFF (AEP-3)          Rm (14) R-13(1&2B-NNS)  ARR  For  Comp/Comm Rm (AEP-3)                                OFF (15) CK-B7-1&2,  Comp Rm  Normal  Intake  OPEN (AEP-3)
(16) CK"B8-1&2,  Comp Rm  Normal Intake    OPEN (AEP-3)
(17) 3CZ-D16(SA"1),  CR EM  Filt  Recirc  SHUT (MCB)
NOTE:      Accumulator 1A-SA must be depressurized or at the same pressure as the RCS to prevent injection of water into the loops. If necessary, use 1SI"295 and 1SI-298 to reduce the pressure in the accumulator.
: 4. Verify Accumulator  1A"SA  pressure is less than or equal to RCS pressure.
5    Establish phone communications between operations      in the Main Control Room and the Safeguards Test Cabinet.
: 6. Open  Protection System Safeguards Test Train "A" Cabinet 2  door and, with Shift Foreman's approval, commence the slave relay test.
OST-1083 Rev. 3                                                Page  17 of 52
 
Osl 7.3  Train  A Safet  In 'ection  - Go  Circuit  (K603) (continued)
: 7. Energize slave relay K603 by turning test switch S909 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)
: 8. Verify the equipment, realigns      as  follows:
a ~  1CS-238,  Charging Line    Isolation          SHUT
: b. 1SI-4, BIT Outlet Isolation                    OPEN C ~  1SI-246, Accumulator 1A-SA Discharge          OPEN 1BD-11, S/G lA"SN Blowdown      Isolation    SHUT
: e. Train  A  Ventilation:
(1)  3CZ-B1(SA-l),    CR  Norm  Intake        SHUT (MCB)
(2)  3CZ-B3(SA-1),    CR  Norm Exh            SHUT (MCB)
(3)  E-9(1A-SA) Normal Exhaust Fan            OFF (MCB)
(4)  3CZ-B5(SA-1), Equip Prot      Room Air  SHUT (AEP-1)          Inlet Vlv (5)  3CZ-B7(SA-1), Elec Equip Prot      Room SHUT (AEP-1)          Vent Isol (6)  3AC-D4(SA-1),    RAB  Swgr  Rm A  Ret    OPEN (AEP-1)          Air Damper (7)  E-28(lA-SA), Swgr    Rm A  Exh Fan      OFF (AEP-1)
(8)  E-28(1B-SA), Swgr    Rm A  Exh Fan      OFF (AEP-1)
(9)  3AC-D3(SA-1), Swgr    Rm A  OAI  Isol  SHUT (AEP-l, SLB-11)
(10) E-10(lA-SAQ, Elec Equip      Rm  Exh Fan  OFF (AEP-1)
(ll) 3CZ-Bll(SA-1),    CR Emer  Filt OAI    SHUT (MCB)            Vlv OST-1083 Rev. 3                                                Page 18 of 52
 
OS1 7.3  Train  A Safet  in'ection    Go  Circuit  (K603) (continued)
(12) 3CZ-B9(SA-1),    CR  Emer  Filt  OAI  Vlv SHUT (MCB)
(13) R-13(l&"A-NNS),      ARR  For Comp/Comm    ON (AEP-3)            Rm (14) R-13(1&2B-NNS),    ARR  For Comp/Comm    ON (AEP-3)            Rm (15) CK-B7-1&2,  Comp Rm    Normal  Intake    SHUT (AEP-3)
(16) CK-B8-1&2,  Comp Rm    Normal Intake    SHUT (AEP-3)
(17) 3CZ-D16(SA-1),    CR Em  Filt  Recirc    OPEN (MCB)
: 9. Position reset svitch    S921  to  RESET.
: 10. Reset the Control Room    Isolation Signal ll. Prepare following equipment      for testing  as follows'.
: a. Train  A ventilation (1)  CK-B6  (1&2),  Smoke Pur    In Comp Rm  OPEN (AEP-3)
(2)  ES-7(1&2-NNS), Smoke Pur Exh Fan        ON (AEP"3)
(3) ES-1A, Purge Exhaust      Fan            ON (MCB)
(4) 3CZ-B17(SA-1),    CR  Purge Makeup Vlv    OPEN (MCB)
(5) 3CZ-B13(SA-1),    CR  Purge Exh          OPEN (MCB)
: 12. Energize slave relay K603 by turning test switch S909 clockwise and depressing momentarily. (Test svitch            vill spring return to the 'Normal left-hand position).
OST-1083 Rev. 3                                                Page  19  of 52
 
OSl 7.3  Train  A Safet    In'ection    Go  Circuit    (K603) (continued)
: 13. Verify the following      equipment realigns as      follows:
: a. Train  A ventilation (1)  CK-B6  (1&2),  Smoke    Pur In  Comp Rm  SHUT (2)  ES-7(1&2-NNS), Smoke Pur Exh Fan          OFF (3)  ES-lA, Purge Exhaust Fan                  OFF (4)  3CZ-B17(SA-1),    CR  Purge Makeup Vlv    SHUT (5)  3CZ-B13(SA-1),    CR  Purge Exh          SHUT
: 14. Position reset switch      S921  to  RESET.
: 15. Verify the following      equipment status:
1CS-238, Charging Line      Isolation          SHUT
: b. 1SI-4, BIT Outlet Isolation                    OPEN C ~    1SI-246, Accumulator lA-SA Discharge            SHUT
: d. 1BD-'ll, S/G 1A-SN Blowdown      Isolation      SHUT
: e. Train  A Ventilation (1)  3CZ-Bl(SA-1),    CR  Norm  Intake        SHUT (MCB)
(2)  3CZ-B3(SA-1),    CR  Norm Exh            SHUT (MCB)
(3)  E-9(1A-SA), Normal Exhaust Fan            OFF (MCB)
(4)  3CZ-B5(SA-1), Equip Prot      Rm Air    SHUT (AEP"1)          Inlet Vlv (5)  3CZ-B7(SA-l), Elec Equip Prot        Rm  SHUT (AEP-1)          Vent  Isol I
(6)  3AC-D4(SA-1')p  RAB  Swgr  Rm A Ret    OPEN (AEP-1)          Damper (7)  E"28(lA-SA), Swgr    Rm A  Exh Fan      OFF (AEP-1)
OST-1083 Rev. 3                                                Page 20 of 52
 
OS1 7.3  Train  A Safet  In'ection -  Go  Circuit  (K603) (continued)
(8)  E-28(1B-SA), Swgr  Rm A  Exh Fan                OFF (AEP-1) 3AC-D3(SA-1), Swgr  Pw A OAI    Isol            SHUT (AEP-1, SLB-ll)
(10) E"10(1A-SA), Elec Equip      Rm  Exh Fan            OFF (AEP-1)
(11) 3CZ-B17(SA-1),    CR Purge Makeup          Vlv    SHUT (MCB)
(12) 3CZ-B11(SA-1),    CR Emer  Filt  OAI              SHUT (MCB)            Vlv (13) R-13(1&2A-NNS),    ARR  for  Comp/Comm Rm (AEP-3)                                          ON (14) R-13(1&2B-NNS),    ARR  for  Comp/Comm Rm (AEP-3)                                          ON (15) ES-7(l&2X-NNS),    Smoke Purge Exh                OFF Fan (AEP-3)
(16) CK"B7-1&2,  Comp Rm  Normal Intake              SHUT (AEP-3)
(17) CK-B8-1&2,Comp    Rm Normal Intake                SHUT (AEP-3)
(18) CK-B6-1&2,  Smoke Pur  Intake                    SHUT (AEP"3)
(19) 3CZ-D16(SA-1),    CR Em  Filt  Recirc            OPEN (MCB)
(20) 3CZ"B13(SA-1),    CR Purge Exh                    SHUT (MCB)
(21) ES-1A, Purge Exhaust Fan                          OFF (MCB)
(22) 3CZ-B9(SA"1),    CR Emer  Filt OAI            Vlv (MCB)  .                                          SHUT
: 16. Direct the  I&C Technician to remove jumper installed in Step. 7.3.1 unless required by OP-183.01 Verifier
                                                        'echnician OST-1083 Rev. 3                                                        Page 21 of 52
 
OS1 7.3  Train  A  Safet    Iniection  Go  Circuit  (K603) (continued)
: 17. Direct the I&C Technician to reconnect the lead lifted in Step 7.3.2 (Mark this Step NA if Section 7.4 is to be performed next).
Techni"ian                                Verifier
: 18. Realign the following equipment as required for plant operations',
: a. 1CS-238, Charging Line      Isolation Final Position        Positioner        Verifier
: b. 1SI-4, BIT Outlet Isolation Final Position        Positioner        Verifier
: c. 1SI-246, Accumulator lA-SA Discharge Final Position        Positioner        Verifier
: d. 1BD-ll,    S/G 1A-SN Blowdown  Isolation Final Position        Positioner        Verifier
: e. 1SI-246 Breaker on    MCC  1A21-SA Cub. 5C Final Position        Positioner        Verifier
: f. Train    A Ventilation (1)    3CZ-B1(SA-1),  CR  Norm  Intake (MCB)
Final Position      Positioner        Verifier (2)  E-9(lA-SA), Normal Exhaust    Fan (MCB)
Final Position        Positioner        Verifier OST-1083 Rev. 3                                                Page 22 of 52
 
OS1 7.3  Train A Safet    In ection "  Go  Circuit  (K603) (continued)
(3)  3CZ-B3(SA-1),    CR Norm Exh (HCB)
Final Position        Positioner          Verifier (4)  3CZ-B5(SA-I), Equip Pro"    Room Air Inlet Valve (AEP-1)
Final Position        Positioner          Verifier (5)  3CZ-B7(SA-l), Elec Equip Prot    Rm  Vent  Isol (AEP-1)
Final Position        Positioner          Verifier (6)  3AC-D4(SA"1),    RAB SWGR Rm A  Ret  Air Damper (AEP-1)
Final Position        Positioner          Verifier (7)  E-28(1A-SA),  SWGR Rm  A Exh Fan (AEP-1)
Final Position        Positioner          Verifier (8)  E-28(lB-SA),  SWGR Rm  A Exh Fan (AEP-1)
Final Position        Positioner          Verifier (9)  3AC-D3(SA-1), SWGR    Rm A  OAI Isol (AEP"1, SLB-11)
Final Position        Positioner          Verifier (10) E-10(1A-SA), Elec Equip      Rm Exh Fan (AEP-1)
Final Position        Positioner          Verifier
( 11) 3CZ-B17 ( SA-1), CR Purge Nakeup    Vlv (MCB)
Final Position        Positioner          Verifier OST-1083 Rev. 3                                              Page  23 of 52
 
Osl 7.3  Train A Safet  In ection -  Co Circuit  (K603) (continued)
(12) 3"2-811(SA-1),  CR Emer  Filt OAI  Vlv (MCB)
Final Position      Positioner          Verifier (13) R-13(l&2A-NNS),  ARR  for  Comp/Comm Rm (AEP-3)
Final  Position'ositioner                Verifier (14) ES-7(1&2X-NNS),  Smoke  Pur Exh Fan (AEP-3)
Final Position      Positioner          Verifier (15) CK-B7-1&2, Computer  Room  Normal Intake (AEP-3)
Final Position      Positioner          Verifier (16) CK-B8-1&2, Computer  Room  Normal  intake (AEP"3)
Final Position      Positioner          Verifier (17) CK-B6-1&2,  Smoke Pur  Intake (AEP-3)
Final Position      Positioner          Verifier (18) 3CZ-D16(SA-l),  CR Em  Filt  Recirc (MCB)
Final Position      Positioner          Verifier (19) 3CZ-B13(SA-1),  CR Purge Exh (MCB)
Final Position      Positioner          Verifier (20) ES-1A, Purge Exhaust Fan Final Position      Positioner          Verifier OST-1083 Rev. 3                                              Page 24 of 52
 
Osl 7.3  Train  A Safet    In'ection -  Go  Circuit  (K603) (continued)
(21) 3CZ"B9(SA-1),    CR  Emer Filt  OAI  Vlv Final Position        Positioner          Verifier (22) R-13(162B)    ARR  for  Comp/Comm  Rm (AEP-3)
Final Position        Positioner          Verifier
      ]9. Verify Accumulator 1A-SA is repressurized          once discharge valve 1SI-246 is SHUT if depressurized in          a previous step.
: 20. Return the  SGMLU  System to the desired      lineup per OP-183.01.
7.4  Train  A  Safet  In'ection    Go  Circuit  (K608)
CAUTION The perEormance  of this test diverts the A Train ESM Return Header to the Auxiliary Reservoir. This test should not be performed            if the Circulating Mater System has been recently chlorinated (check with Chemistry to determine restrictions) OR        if the CTMU System is not available for makeup to the cooling tower basin. Maintain maximum makeup Elow and monitor basin level to avoid the cavitation of a Service Water Pump.
: 1. Direct the I&C Technician to install jumper between terminals 93 and 107 in ARP-19A (SA)F3 to defeat the          SG Low  Pressure interlock Eor 1BD-30 unless already done by OP-183.02.    (Ref. 2.5.b.2)
: 2. If  any Steam Generator level is below 38.5X, direct the ISC Technician to    lift  the lead at terminal 60 in ARP" 19A (SA) F3 to defeat the SG low level interlock Eor 1BD-30 (Mark this sXep NA      if lead not reconnected in Section 7.3)  ~
OST-1083 Rev. 3                                                  Page 25 of 52
 
OS1 7.3  Train  A  Safet    In 'ection "    Go  Circuit  (K603) (continued)
: 3. Prepare the following equipment            for testing    as  fcl.lows:
: a.      1SW-270,    ESW  Hdr A Return  to  Aux Rsvr      SHUT B
s    1BD-30, S/G IE-SN Bloudoun        CNHT  Isol      OPEN
: c.      1SP-222,    S/G 1B-SN Sample CNMT      Isol      OPEN
: d.      1SP-217,    S/G 1A"SN Sample    CNMT  Isol      OPEN
: e.      SGWLU pump    for  B S/G                      SECURED 4e  Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.
: 5. Open    Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's          approval, commence the slave relay test.
NOTE:      1SM-270    will cycle    from shut to open then back to shut when K608      is energized.
: 6. Energize slave relay K608 by turning test switch S910 clockwise and depressing momentarily. (Test s~itch will spring return to the normal left"hand position.)
: 7. Verify the following valves realign            as  follows',
: a.      1SM-270,    ESM  Hdr A Return to Aux Rsvr        OPEN THEN SHUT U.
IBD-30,    S7G  IB-SN Bloudoun  CNHT  Isol      SHUT
: c. 1SP-222, S/G 1B-SN Sample      CNMT  Isol        SHUT
: d.      1SP-217,    S/G lA-SN Sample CNMT    Isol        SHUT
: 8. Position reset switch        S921 to RESET.
: 9. Verify the following valve status'.
: a.      1SW-270,    ESW  Hdr A Return  to Aux Rsvr      SHUT OST-1083 Rev. 3                                                      Page 26  of 52
 
Osl 7.4  Train  A Safet    In ection  - Go  Circuit (K608) (continued)
: b. 1BD-30, S/G 1B"SN Bio+down    CNMT  Isol    SHUT
: c. 1SP-222,  S/G 1B-SN Sample CNMT    Isol      SHUT
: d. 1SP-217,  S/G 1A-SN Sample CNMT    Isol    SHUT
: 10. Direct the  I&C Technician to remove jumper installed in Step. 7.4.1 unless required by OP-183.02.
Technician                            Verifier
: 11. Direct the 16C Technician to reconnect the lead lifted in Step 7.4.2.
Technician                            Verifier
: 12. Reposition the following valves as required for plant operations:
: a. 1SW-270,  ESW  Hdr A Return to Aux Rsvr Final Position        Positioner        Verifier
: b. 1BD-30, S/G 18-SN Blovdown    CNMT  Isol Final Position        Positioner        Verifier
: c. 1SP-222,  S/G 1B-SN Sample    CNMT  Isol Final Position        Positioner        Verifier
: d. 1SP-217,  S/G lA-SN Sample CNMT    Isol Final Position        Positioner        Verifier
: 13. Return the  SGWLU  System  to the desired lineup per OP-183.02.
OST-1083 Rev. 3                                                Page 27 of 52
 
OS1 7.5  Train  A Safet    In'ection  Go    Circuit  (K610)
: 1. Prepare the equipment        for testing  as  follows:
: a. Diesel Generator 1A-SA        Prepare  for startup per OP-155
: b. 1CH-149,  Chill  Water to    NESSR Fan  Clrs  OPEN
: c. 1CH-197,  Chill  Water to    NESSR Fan  Clrs  OPEN
: d. ALB-23-3-7,  RAB NORM EXE XBOL DMPR TRBL OPP
: e. A Train  RAB  Normal Exhaust Dampers:
(1)  AV-D3SA-1                                  OPEN (2)  AV-D5SA-1                                  OPEN (3)  AV-D7SA-1                                  OPEN (4)  AV-D9SA-1                                  OPEN (5)  AV-D11SA-1                                OPEN (6)  AV-D13SA-1                                OPEN (7)  AV-D15SA-1                                OPEN (8)  AV-D17SA-1                                OPEN (9)  AV"D19SA-1                                OPEN (10) AV-D21SA-1                                  OPEN (11) AV-D23SA-1                                  OPEN (12) AV"D25SA-1                                  OPEN (13) AV-D27SA-1                                  OPEN (14) AV-D29SA-1                                  OPEN (15) AV-D31SA-1                                  OPEN (16) AV-D33SA-1                                  OPEN AV-D35SA-1
                                  '17)
OPEN (18) AV-D37SA-1                                  OPEN OST"1083 Rev. 3                                                  Page 28 of 52
 
OS1 7.5  Train  A  Safet  In ection  - Go  Circuit (K610) (continued)
(19) AV-D52SA-1                            OPEN (20) AV-D58SA-1                            OPEN (21) AV-D62SA-1                            OPEN (22) AV-D66SA"1                            OPEN (23) AV-D70SA-1                            OPEN (24) AV-D74SA-1                            OPEN (25) AV-D78SA-1                            OPEN (26) AV-D82SA-1                            OPEN (27) AV-D86SA-1                            OPEN
: 2. Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.
: 3. Open  Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's approval, commence the slave relay test.
: 4. Coordinate with the diesel operator to prelube the Diesel Generator and energize slave relay K610 by turning test switch S912 clockvise and depressing momentarily. (Test switch vill spring return to the normal left"hand position.)
5'erify the        equipment realigns as follows:
Diesel Generator 1A-SA                    STARTS
: b. 1CH-149,  Chill  Water to  NESSR Fan Clrs  SHUT C  ~  1CH-197,  Chill  Water to  NESSR Fan Clrs  SHUT
            'd ~  ALB-23-3-7,  RAB CFORM EXH ISOL DMPR TRBL    ON
: e. A  Train RAB  Normal Exhaust Dampers:
(1)  AV-D3SA-1                            SHUT (2 ) AV-D5SA-1                            SHUT OST-1083 Rev. 3                                              Page 29 of 52
 
OS1 7.5  Train  A Safet  In'ection -  Go  Circuit (K610) (continued)
(3)  AV-D7SA-1                            SHUT (4)  AV-D9SA-1                            SHUT (5) AV-011SA-1                            SBUT (6)  AV-D13SA-1                            SHUT (7)  AV-D15SA-1                            SHUT (8) AV"D17SA-1                            SHUT (9)  AV-D19SA-1                          SHUT (10) AV-D21SA-1                          SHUT (11) AV-D23SA-1                            SHUT (12) AV-D25SA-1                            SHUT (13) AV-D27SA-1                            SHUT (14) AV-D29SA-1                          SHUT (15) AV-D31SA-1                          SHUT (16) AV-D33SA-1                          SHUT (1/) AV-D35SA-1                          SHUT (18) AV-D37SA-1                          SHUT (19) AV-D52SA-1                          SHUT (20) AV-D58SA-1                          SHUT (21) AV-D62SA-1                          SHUT (22) AV-D66SA"1                          SHUT (23) AV-D70SA-1                          SHUT (24) AV-D74SA-1                          SHUT (25) AV-D78SA-.3.                        SHUT (26) AV-D82SA-1                          SHUT (27) AV-D86SA-1                          SHUT
: 6. Position reset switch  S921  to RESET.
OST-1083 Rev. 3                                            Page 30 of 52
 
S Osl 7.5  Train  A Safet  In'ection -    Go Circuit  (K610) (continued)
: 7. Verify the folloving equipment status'.
: a. Diesel Generator 1A-SA                    RlJNN ING b."  1CH-149,  Chill  Water to  NESSR  Fan C's    SHUT C ~  1CH-197,  Chill  Water to. NESSR Fan  Clrs  SHUT
: d. ALB-23-3-7,  RAB NORM EXH ISOL DMPR TRBL        OFF
: e. A Train  RAB Normal Exhaust Dampers:
(1)  AV-D3SA-1                              ,OPEN (2)  AV-D5SA-1                                OPEN (3)  AV-D7SA"1                                OPEN (4)  AV"D9SA-1                                OPEN (5)  AV-D11SA-1                              OPEN (6)  AV-D13SA-1                              OPEN (7)  AV-D15SA-1                              OPEN (8)  AV-D17SA-1                              OPEN (9)  AV-D19SA-1                              OPEN (10) AV-D21SA-1                              OPEN (11) AV-D23SA-1                              OPEN (12) AV-D25SA-1                              OPEN (13) AV-D27SA-1                              OPEN (14) AV-D29SA-1                              OPEN (15) AV"D31SA-1                              OPEN (16) AV-D33SA-1                              OPEN (17) AV-D35SA~l
                              ':                              OPEN "C.
(18) AV-D37SA-1                              OPEN (19) AV"D52SA-1                              OPEN (20) AV-D58SA-1                              OPEN OST-1083 Rev. 3                                                Page 31 of 52
 
OS1 7.5  Train  A Safet    ln 'ection  Go Circuit  (K610) (continued)
(21) AV-D62SA-1                            OPEN (22) AV-D66SA-1                            OPEN (23) AV-D70SA-1                            OPEN (24)  AV-D74SA-'PEN (25) AV-D78SA-1                            OPEN (26) AV-D82SA-1                            OPEN (27) AV-D86SA-1                            OPEN
: 8. Secure the 1A-SA Diesel Generator per OP-155.
: 9. Return  RAB Normal  Ventilation to service per  OP-172, RAB HVAC  System.
: 10. Realign the following equipment as required for plant operations:
: a. 1CH-149,  Chilled Water to  NESSR Fan Coolers Final Position      Positioner      Verifier
: b. 1CH-197,  Chilled Water to  NESSR Fan Coolers Final Position      Positioner      Verifier OST-1083 Rev. 3                                            Page 32 of  52
 
OS1 7.6  Train  A Safet  In'ection -  Go Circuit    (K636)
CAUTION 1CS-745, CSIP  A  Alt Miniflow Val.ve,    must be CLOSED  prior to opening 1CS-746 to prevent    lifting the    Miniflow Line relief valve.
: 1. Prepare the valves for testing as follows:
: a. 1CS-746, CSIP  A  Alt Miniflow Valve          SHUT
: b. 1CS-745, CSIP  A  Alt Miniflow Valve          SHUT 2 ~  Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.
: 3. Open  Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's approval, commence slave relay test.
: 4. Energize slave relay K636 by turning test switch S911 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)
: 5. Verify the valves realign    as  follows.
: a. 1CS-746, CSIP  A Alt Miniflow Valve          OPEN
: 6. Position reset switch  S921  to  RESET.
: 7. Verify the following valve status.
: a. 1CS-746, CSIP A  Alt Miniflow Valve          OPEN OST-1083 Rev. 3                                                Page 33  of 52
 
Osl 7,6  Train  A Safet  Zn ection  Go  Circuit  (K636) (continued)
CAUTION 1CS-745, CSIP A  Alt Miniflow Valve,    must be CLOSED  prior to opening 1CS-746 to prevent    lifting the    Miniflow Line relief valve.
: 8. Reposition the following valves    as  required for plant operations:
: a. 1CS-745, CSIP 1A-SA  Alternate Miniflow Valve Final Position      Positioner        Verifier
: b. 1CS-746, CSIP lA-SA  Alternate Miniflow Valve Final Position        Positioner        Verifier OST"1083 Rev. 3                                              Page 34  of 52
 
Os  1 7 '  Train  A  Containment  Isolation  Phase  A -          Go  Circuit  (K622)
NOTE:      The  actuation of this slave relay              will cause  one letdown orifice isolation valve to      SHUT.
: 1. Prepare    the equipment  for testing            as  follows:
: a. 1CS-9,  Letdown  Orifice  C Isolation                  OPEN
: b. 1SI-263, Accumulator Test Return Isol                  OPEN
: c. 1SW-231,  NNS CENT Peo  Cooler            SW  Supply  OPEN
: d. 1SW-2402  NNS CNMT  Fan Cooler            SW  Return  OPEN
: e. CNMT  Fan Coolers:
(1)  AH-37 (1A-NNS)                                      ON (2)  AH-37 (1B-NNS)                                      ON (3)  AH-38 (1A-NNS)                                      ON (4)  AH-38 (1B-NNS)                                      ON (5)  AH-39 (1A-NNS)                                      ON (6)  AH-39 (18-NNS)                                      ON
: 2. Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.
NOTE:      Monitor CNMT area temperatures and RCP motor and winding temperatures while CNMT Fans are out of service.
3 ~  Open  Protection System Safeguards Test Train "A" Cabinet 2  door and, with  Shift Foreman's approval, commence the slave relay test.
: 4. Energize slave relay K622 by turning test switch S916 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)
5 ~  Verify the    equipment realigns as    follows.'.
1CS-9, Letdown  Orifice  C Isolation                  SHUT
: b. 1SI-263, Accumulator Test Return Isol                  SHUT OST-1083 Rev. 3                                                            Page  35 of 52
 
0$ 1 7.7  Train A Containment Isolation      Phase  A -  Go  Circuit  (K622)
(continued)
: c. 1SW"231> NNS CNMT Fan      Cooler  SW  Supply  SHUT
: d. 1SW-240, NNS  CNMT    Fan  Cooler  SW  Return  SHUT
: e. CNMT Fan Coolers:
(1)  AH-37 (1A-NNS)                              OFF (2)  AH-37 (1B"NNS)                              OFF (3)  AH-38 (1A-NNS)                              OFF (4 ) AH-38 ( 1B-NNS )                            OFF (5)  AH-39 (1A-NNS)                              OFF (6)  AH-39 (1B-NNS)                              OFF
: 6. Position reset switch      S921  to  RESET.
: 7. Verify the following      equipment status'.
a ~  1CS-9, Letdown    Orifice  C  Isolation      'HUT
: b. 1SI-263, Accumulator Test Return Isol            SHUT C ~  1SW-231, NNS  CNMT    Fan Cooler    SW  Supply  SHUT
: d. 1SW"240, NNS  CNMT    Fan  Cooler  SW  Return  SHUT
: e. CNMT Fan Coolers:
(1) ,AH-37 (1A-NNS)                              OFF (2)  AH-37 (1B-NNS)                              OFF (3)  AH-38 (1A-NNS)                              OFF (4)  AH"38 (1B-NNS)                              OFF (5)  AH-39 (1A-NNS)                              OFF L
                              ~ '~
(6)  AH-39 (1B-NNS)
OST-1083 Rev. 3                                                  Page 36  of 52
 
Osl 7.7  Train A Containment Isolation    Phase  A  "  Go  Circuit  (K622)
(continued
: 8. Realign the following equioment as required for plant operations:
: a. 1CS-9, Letdown  Orifice  C Isolation Final Positior      Positioner          Verifier
: b. 1SI-263, Accumulator Test Return Isolation Final  Pos tion      Positioner          Ver'fier
: c. 1SW-231,  NNS CNMT Fan  Cooler  SW  Supply Final Position      Positioner          Verifier
: d. 1SW-240,  NNS CNMT Fan  Cooler  SW  Return Final Position      Positioner          Verifier
: e. CNMT  Coolers:
(1)  AH"37 (lA-NNS)
Final Position      Positioner          Verifier (2)  AH"37 (18-NNS)
Final Position      Positioner          Verifier (3)  AH-38 (1A-NNS)
Final Position      Positioner          Verifier (4) 'H-38 (1B-NNS)
Final Position''E. Positioner          Verifier (5)  AH-39 (1A-NNS)
Final Position      Positioner          Verifier OST-1083 Rev. 3                                                Page 37 of 52
 
0 OS1
~
7.7  Train A Containment Isolation  Phase  A - Co Circuit  (K622) continued)
(6)  AH-39 (1B-NNS)
Final. Positior. Positioner      Verifier OST-1083 Rev. 3                                            Page 38 of 52
 
OS1 7.8  Train  A  Loo  1 AFW Line Isolation    Go  Circuit  (K615)
: 1. Prepare the valves    for testing  as  follows:
a.. 1AF-137,  AFW Pump  1X"SAB  to  S/G 1A-SN    OPEN
: b. 1AF-49,  AFW Reg  Valve to S/G 1A-SN          OPEN
: 2. Unlock and Shut the. following valves to preven't cold water from being injected to the Steam Generators when Motor Driven Auxiliary Feedwater Pump is running. (NA for pump not to be run)
: a. 1A MDAFW Pump (1)  1AF-36,  AFWP 1A  First Isol. to    C  S/G.
(2)  1AF-40,  AFWP 1A  Isolation to  A  S/G.
: b. 1B MDAFW Pump (1)  1AF-39,  AFWP 1B  First Isolation to    C  S/G.
(2)  1AF-42,  AFWP 1B  Isol,ation to  B  S/G.
: 3. Start  Aux Feedwater  Pump  1A OR 1B (NA pump    not used).
: a. 1A MDAFW Pump
: b. 1B MDAFW Pump
: 4. Establish phone communications between operators the Main Control Room and the Safeguards Test Cabinet.
: 5. Open  the Protection System Safeguards Test Train "A" Cabinet 2 door and, with the Shift Foreman's approval, commence the slave relay test.
6    Energize slave relay K615 by turning test switch S922 clockwise and 'depressing momentarily. (Test switch will spring return to the normal left-hand position.)
OST-1083 Rev. 3                                                Page 39  of 52
 
Osl 7.8  Train A Loo    1  AFW  Line Isolation    -  Go  Circuit  (K615)
(continued)
: 7. Verify the valves realign        as  follows:
: a. 1AF-137,    AFW Pump  1X-SAB    to  S/G 1A-SN    SHUT
: b. 1AF-49,    AFW Reg Valve to S/G 1A-SN            SHUT
: 8. Release test switch S922 (Test s~itch            will spring return to the normal left"hand position).
: 9. Position reset switch      S921  to  RESET.
: 10. Realign the following valves as required for plant operations:
: a.  'AF-137,      AFW Pump  1X"SAB    to  S/G 1A"SN Final Position        Positioner            Verifier
: b. 1AF-49,    AFW Reg Valve to S/G 1A-SN Final Position        Positioner            Verifier NOTE:      Mark the    following steps  N/A  if Section    7.9 is to  be performed next.
Stop the Aux Feedwater      Pump  started in Step    3  per OP-137.      (NA pump  not used) a ~    lA  MDAFW Pump
: b. 1B MDAFW Pump
: 12. Open and    lock  open the  following valves'(NA valves not shut in Step 2)
: a. 1A MDAFW Pump.
(1)    1AF-36,  AFWP 1A  First Isol to    C S/G LOCKED OPEN VERIF OST-1083 Rev. 3                                                  Page 40 of 52
 
OS1 7.8    Train A"Loo      1  AFW  Line Isolation    Go  Circuit  (K615) continued (2)    1AF-40,  AFWP 1A  Isolation to  A  S/G LOCKED OPEN VERIF
: b. 1B MDAFW Pump (1)    1AF-39,  AFWP 1B  First Isol to    C  S/G LOCKED OPEN VERIF (2)    1AF-42,  AFWP 1B  Isolation to  B  S/G LOCKED OPEN VERIF 7.9    Train  A Loo    2 AFW  Line Isolation  -  Go Circuit    (K616)
: 1. Prepare the valves      for testing    as follows:
: a. 1AF"143,    AFW Pump  1X-SAB  to S/G )B-SB      OPEN B. 1AF-51,    AFW ReS Valve te S/G 1B-SB            OPEN NOTE:      Mark the    following 2 steps N/A    if this equipment    was left in    the required lineup in Section 7.8.
2~    Unlock and Shut the following valves to prevent cold water from being injected to the Steam Generators when Motor Driven Auxiliary Feedwater Pump is running. (NA for pump not to be run) a ~  1A MDAFW Pump (1)    1AF-36, AFWP 1A  First Isol. to    C  S/G.
(2)    1AF-40, AFWP  lA Isolation to  A  S/G.
: b. 1B MDAFW Pump (1)    1AF-39, AFA'B First Isol. to        C  S/G.
(2)    1AF-42, AFWP 1B  Isolation to  B  S/G.
OST-1083 Rev. 3                                                    Page 41  of 52
 
Osl 7.9  Train A Loon  2 AFW  Line isolation      Go    Circuit (K616)
(continued
: 3. Start  Aux Feedwater  Pump    lA  OR  1B.  (NA pump  not used)
: a. 1A MDAFW Pump
: b. 1B MDAFW Pump
: 4. Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.
1 Open  the Protection System Safeguards Test Train "A" Cabinet 2 door and, with the Shift Foreman's approval, commence the slave relay test.
6,    Energize slave relay K616 by turning test switch S923 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)
: 7. Verify the valves realign        as  follows:
: a. 1AF-143,  AFW Pump    1X-SAB    to  S/G 1B-SN    SHUT B. 1AF-51,  AFW Reg  Valve to S/G 1B-SN            SHUT
: 8. Release  test switch S923 (Test switch          will spring return to the normal left-hand position).
: 9. Position reset s~itch      S921  to  RESET.
10  'ealign    the following valves as required for plant operations:
: a. 1AF-143,  AFW Pump    1X-SAB    to  S/G 1B-SN Final Position    'ositioner E.
Verifier
: b. 1AF-51,  AFW Reg  Valve to S/G 1B-SN Final Position        Positioner            Verifier OST-1083 Rev. 3                                                    Page 42  of 52
 
OS1 7.9  Train A Loo      2 AFW  Line Isolation  -  Go  Circuit (616)
(continued)
NOTE:      Mark the    following steps    N/A if Section    7,10  is'to be performed next.
Stop the Aux Feedwater Pump      started in Step    3  per OP-137.      (NA pump not used) a ~    1A MDAFW Pump
: b.      1B MDAFW Pump
: 12. Open and    lock  open the following valves'(NA valves not shut in Step    2  of this section or 7.8) a ~    1A MDAFW Pump (1)  1AF-36  AFWP 1A  First Isol to  C  S/G.
LOCKED OPEN VERIF (2)  1AF-40  AFWP 1A  Isolation to  A  S/G.
LOCKED OPEN VERIF
: b.      1B MDAFW Pump (1)  1AF-39,  AFWP 1B  First Isol. to    C  S/G LOCKED OPEN VERIF (2)  1AF-42,  AFWP 1B  Isolation to  B  S/G LOCKED OPEN VERIF 7.10 Train  A Loo    3 AFW  Line Isolation  -  Go  Circuit  (K617)
: 1. Prepare the valves Efor testing as follows'.
: a.      1AF-149,    AFW Pump 1X-SAB  to  S/G 1C-SN      OPEN
: b.      1AF-50,  AFW Reg  Valve to S/G 1C-SN            OPEN OST-1083 Rev. 3                                                  Page 43  of 52
 
Osl 7.10 Train  A Loo    3 AFW Line Isolation -  Go  Circuit  (K617)
(continued)
NOTE:      Mark the    following 2 steps N/A    if  this equ'pment  was left in  the requireo lineup 'n Sr tion 7.9
: 2. Unlock and Shut the following valves to prevent co'.d water from being inj cted to the Steam Generators when Motor Driven Auxiliary Feedwate" Pump is running. (NA for pump not to be run)
: a. 1A MDAFW Pump (1)  lAF-36,  AFWP 1A  First Isol. to  C  S/G.
(2)  1AF-40,  AFWP 1A  Isolation to  A S/G.
: b. 1B MDAFW Pump (1)  1AF-39,  AFWP 1B  First isoi. to  C  S/U ~
(2)  1AF-42,  AFWP 1B  Isolation to  B S/G.
: 3. Start  Aux Feedwater  Pump  1A OR 1B.    (NA pump  not used)
: a. 1A MDAFW Pump
: b. 1B MDAFW Pump
: 4. Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.
5 ~  Open  the Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's approval, commence the slave relay test.
: 6. Energize slave relay K617 by turning test switch S924 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)
: 7. Verify the valves .realign    as follows'.
t
: a. 1AF-149,  AFW Pump  1X"SAB  to  S/G 1C-SN    SHUT
: b. 1AF-50,  AFW Reg  Valve to S/G 1C-SN          SHUT OST-1083 Rev. 3                                              Page 44  of 52
 
Osl 7.10 Train  A Loo    3 AFW  Line Isolation -    Go  Circuit  (K617) continued
: 8. Release  test s~itch S924 (Test switch      w'll  spring return to the normal left-hand position).
: 9. Position reset switch    S921  to  RESET.
: 10. Realign the following valves as required for plant operations:
: a. 1AF-149,  AFW Pump  1X-SAB  to  S/G 1C-SN Final Position        Positioner          Verifier
: b. 1AF-50,  AFW Reg  Valve to S/G 1C-SN Final Position        Positioner          Verifier
: 11. Stop the Aux Feedwater Pump started        in Step  3  per OP-137.    (NA pump not used)
: a. 1A MDAFW Pump
: b. 1B MDAFW Pump
: 12. Open and  lock open the following valves: (NA valves not shut in Step    2 of this section or 7.8 or 7.9)
: a. 1A MDAFW Pump (1)  lAF-36,  AFWP 1A  First Isol to    C S/G ~
LOCKED OPEN VERIF.
(2)  1AF"40,  AFWP 1A  Isolation to "B"    S/G.
LOCKED OPEN VERIF.
OST-1083 Rev. 3                                                  Page 45 of 52
 
Osl 7.10 Train    A Loo    3 AFW  Line Isolation    - Go  Circuit    (K617)
(continued)
: b.      1B MDAFW Pump (1)    lAF-39, AFWP 1B    First 'Isol. to    C  S/G.
LOCKED OPEN VERIF (2)    1AF-42, AFWP 1B    Isolation to    B  S/G.
LOCKED OPEN VERIF 7.11 Train    A  SI  for Switchover to Recirculation -          Go  Circuit (K739    K740    K741)
: 1. Prepare the equipment        for testing  as  follows:
: a.      1SI-300,  CNMT Sump  to  RHR Pump A  Isol      SHUT
: b.      1SI-310,  CNMT Sump  to  RHR Pump A  Isol      SHUT C ~    1CT-105,  CNMT Sump  to  CS Pump A  Suet        SHUT
: d.      1CT-26,  CNMT Spray  Pump A  Suction            SHUT
: e.      RWST/  Lo-Lo LVL Bistables on TSLB-4, LB990C, LB991C, LB992C, and LB993C                  OFF
: f.      CS  Pump A  Breaker on Emer Bus 1A2"SA Cub.          4C RACKED OUT
: g.      1CT-26 Breaker    at  MCC  1A21-SA Compt. 10B.
OFF 2~    Have a Maintenance Electrician install a jumper across terminals 20 and 24 in MTC 8A-SA Panel 1 to simulate CS Pump    breaker closure.
CAUTION The water in the      CNMT  Spray System is contaminated,        use appropriate actions in accordance with AP-503 in handling the contaminated    fluid.
: 3. Drain Containment Spray System        A as  follows:
OST-1083 Rev. 3                                                        Page 46 of 52
 
Osl 7.11 Train  A  SI  for Switchover to Recirculation -      Go  Circuit (K739    K740    K741)  (continued) a ~    Shut or check    SHUT  the following valves:
(1)    1CT-50  CNMT SPRAY PUMP  A-SA DISCHARGE (2)    1CT-47  CNMT SPRAY PUMP  A-SA RECIRC (3)    1CT-36  CS  PUMP A EDUCTOR  LINE INLET ISOL (4,)  1CT-39  CS  PUMP A EDUCTOR  LINE OUTLET ISOL
: b.      Open the low    point drain at  CNMT  Spray. Pump (RAB 190):
(1)    1CT-28  CS  PUMP A SUCTION  LINE DRAIN (2)    1CT-29  CS  PUMP A SUCTION  LINE DRAIN C ~    Open  the high point vent at    CNMT  Penetration  23 (RAB  236):
(1)    1CT-45 SPRAY    HDR A TEST CONN (2)    1CT-46 SPRAY    HDR A TEST CONN Mhen  piping is empty, shut the low point drain valves:
(1)    1CT-28  CS PUMP A SUCTION  LINE DRAIN Verif.
(2)    1CT-29  CS PUMP A SUCTION  LINE DRAIN Verif.
: 4. Establish communications between operators in the Main Control Room and the Safeguards Test Cabinet.
: 5. Open    Protection System Safeguards Test Train "A" Cabinet 2 door and, with Ship Foreman's approval, 'commence the slave relay test.
: 6. Energize slave relay K740 by turning test switch S940 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)
OST-1083 Rev. 3                                                  Page 47  of 52
 
OS1 7.11 Train A SI    for Switchover to Recirculation                  Go Circuit (K739    K740    K741) (continued)
: 7. Verify    Bypass Permiss  ve  Light Panel light 4-8 SI Actuated    RHR SUCT  will xfer    on RWST LO-LO LEVEL illuminates.
: 8. Verify light on    SI SUCTION  AUTO SWITCH OVER RESET TRAIN A illuminates.
: 9. Energize slave relay K741 by turning test switcn S941 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)
: 10. Verify the valves realign      as  follows:
: a.      1SI-300, CNMT Sump  to  RHR Pump A              Isol  OPEN
: b.      1CT-105, CNMT Sump  to  CS Pump A              Suet    OPEN ll. Realign the valves as follows'.
: a.      1SI-300, CNMT Sump  to  RHR Pump              A  Isol  SHUT
: b.      1CT"105, CNMT Sump  to  CS            Pump A  Suet    SHUT
: 12. Energize slave relay K739 by turning test switch S942 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)
: 13. Verify the valves realign      as  follows.'.
1SL-310,  CNMT Sump  to  RHR Pump A              Isol  OPEN
: b.      1CT-105,  CNMT Sump  to  CS Pump A              Suet    OPEN
: 14. Realign the valves as follows'.
: a.      1SI"310,  CNMT Supp to    RHR Pump A              Isol  SHUT
: b.      1CT-105,  CNMT Sump  to  CS            Pump A  Suet    SHUT
: 15. Position reset switch    S921    to            RESET.
OST-1083 Rev. 3                                                          Page 48 of 52
 
Os 1 7.11 Train A SI Eor Switchover to Recirculation  Go          Circuit (K739    K740  K741)  continued
: 16. Position SI  SUCTION AUTO SWITCHOVER RESET TRAIN A        switch to RESET.
: 17. VeriEy Bypass Permissive'ight Panel          light 4-8 SI ACTUATED RHR SUCT WILL XFER ON RWST LO-L'0 LEVEL extinguishes.                        N 18e  Verify light    on SI SUCTION AUTO SWITCH OVER RESET TRAIN A  extinguishes.
: 19. Have the Maintenance    Electrician    remove the jumper across terminals    20 and 24    in  MTC  8A-SA Panel 1.
Electrician Verifier
: 20. Refill  the Containment Spray System      A  piping as follows:
: a. Turn on power supply MCC 1A21-SA Compt. 10B and then open 1CT"26 RWST to CNMT SPRAY PUMP A-SA.
breaker ON valve OPEN
: b. When a solid water stream flows from the vent, close the following', independent verificatrion is required.
1CT-45 SPRAY    HDR A TEST CONN            CLOSED 1CT-46 SPRAY  HDR A TEST CONN            CLOSED c~    Vent the  CS Pump  A-SA  casing.              VENTED
: d. Vent aEfected instrumentation:
PI-7120A  CSP"SA  Suction Pressure            VENTED PI-7120A  CSP"S'A'eduction  Pressure          VENTED PI-7130A  CSP-SA  Discharge Pressure          VENTED PI-7131A  CSP-SA  Discharge Pressure          VENTED FT-7122A CSP-SA Flow                            VENTED OST-1083 Rev. 3                                                  Page 49  of  52
 
OS1 7.11 Train  A  SI  for Switchover to Recirculation        Go  Circuit (K739    K740  K741) (continued)
: 21. Realign the follcwing equipment as required for plant operations:
: a. 1SI-300,  CNMT Sump    to  RHR Pump A  Isol Final Position        Positioner          Verifier
: b. 1SI-310,  CNMT Sump    to  RHR Pump A  Isol Final Position        Positioner          Verifier
: c. 1CT-105,  CNMT  to  CS  Pump A  Suet Final Position        Positioner          Verifier
: d. 1CT-26,  CNMT  Spray  Pump A  Suction Final Position        Positioner          Verifier
: e. CNMT Spray Pump A Breaker on Emer Bus 1A2-SA Compt. 4C Final Position        Positioner          Verifier
: f. 1CT-36,  CS Pump A  Eductor Line    Inlet Isol Final Position        Positioner          Verifier
: g. 1CT-39,  CS Pump  A Eductor Line Outlet Isol Final Position         Positioner         Verifier 8.0  DIAGRAMS/ATTACHMENTS Attachment    I - Calibration    Data Attachment    II  Certifications      and Reviews OST-1083 Rev. 3                                                Page  50 of 52
 
OSl ATTACHMENT I                                      Page  1 of  1 Calibration Data INST/MODEL 0          DESCRIPTION INST I.D. CPL DUE DATE VOLTMETER STOP MATCH
* RONAN
* RONAN
* RONAN
* RONAN
* RONAN
* RONAN
- If required  due to Drained  S/G OST-1083 Rev. 3                                   Page 51  of 52
 
Osl
    'TTACHMENT II  CERTIFICATIONS              AND REVIEWS                        Page'1 of   1 This  OST was                erformed as a.'eriodic  surveillance requirement Post-Maintenance                    Operability Test            Redundant  Subsystem Test Plant  Conditions.'ST Mode:
Completed by.
DATE      TIME OST   Performed                B Initials                          Name  (Print)                  Initials        Name (Print)
General Comments/Recommendations/Corrective                    Actions:
Pages    Used:
Fill out    Task Sheet OSRM019                if done during refueling.
Fill out    Task Sheet OSER019                if done during cold shutdown  >72  hours.
OST Has Been                  Satisfactoril /Unsatisfactoril    Com  leted:
Shift    Foreman                                                                            Date REVIEWED BY:
Manager - Shift Operations                     Date OST-1083 Rev. 3                                                                       Page 52 of   52}}

Revision as of 05:24, 22 October 2019

Rev 3 to Vol 3,Part 9 of Plant Operating Manual Procedure OST-1083, ESFAS Train 'A' Slave Relay Test 18 Months Interval Modes 5 & 6.
ML18010A837
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/04/1992
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML18010A832 List:
References
OST-1083-P09, OST-1083-P9, NUDOCS 9210280094
Download: ML18010A837 (61)


Text

9210280094 921009 PDR ADOCK 0500040 Osl P PD R CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT PLANT OPERATING MANUAL VOLUME 3 PART 9 PROCEDURE TYPE'perations Surveillance Test OST-1083 TITLE 'SFAS Train "A" Slave Relay Test 18 Months Interval Modes 5 and 6 REVISION 3 HNP 00CUMKMTCGMTRQ.

NOTE: This procedure has been screened in accordance with PLP-100 AQ criteria and determined to be a Case II procedure. This procedure requires POD or Outage meeting, SubUnit Manager, or higher, 3 )

evaluation as to level of management required to be involved in preparations and conduct of this test.

~FFFl >~E APR ) 6 Ml APPROVED:

xgna re Date

~~J TITLE: MANAGER - OPERATIONS HNP CONTROLLED COPY P~ Page 1 of 52

OS1 List of Effective Pa es

~Pa e Revision 1, 2 AC-3/1 3, 4 5, 5a ~ ~ ~ ~ . ~ . AC-3/1 6-52 ~ \ I ~ ~ I ~ ~ 3 OST-1083 Rev. 3 Page 2 of 52

OS1 1.0 PURPOSE

, The purpose of this procedure is to test the operability of the slave relays of the Solid State Protection System using the Go Circuits. This test will be performed every 18 months during refueling and during each cold shutdown greater than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> unless the relay has been tested within the previous 92 days.

This procedure satisfies the requirements of Technical Specifications 4.3.2 ', Table 4.3-2, Steps l.b, 3.a.2, 3.a.3, 3.c.3, 5.c, 6.d, 6g, 7.a, 7.b, 8.a, and 8.b for Train A. ESFAS Slave Relay Response testing via OST's 1809, 1812, and 1825 or 1826 fulfills the requirements of this test.

2.0 REFERENCES

L. Tech. Spec. 3.3.2

2. FSAR Section 7.3
3. SD-103, Reactor Protection/Engineered Safety Features Actuation System
4. Procedures:
a. OP-155, Diesel Generator Emergency Power System
b. OST-1825, Safety Injection - ESF Response Time Train A
c. OST-1812; AFW Isolation ESF Response Time
d. OST-1809, Switchover to Recirc Sump " ESF,Response Time
e. OST-1826, Safety Injection ESF Response Time Train B
5. Drawings:
a. Simplified Flow Diagrams 2165-S (1) 544, Feedwater System (2) 547, Circulating & Service Water System (3) 550, Containment Spray System (4) 551, Steam Generator Blowdown System (5) 552, Sample System (Nuclear)

(6) 1303, Chemi'cal & Volume Control System (7) 1308, 1309, 1310, Safety Injection System OST"1083 Rev. 3 Page 3 of 52

OS1

2.0 REFERENCES

(continued)

b. Control Wiring Diagrams 2166-8401 (1) Shs. 270, 409, 413, 1206, 1988 Safety Injection (K601)

(2) Shs. 242, 243, 972, 1211, Safety Injection (K602)

(3) Shs. 271, 407, 411, 1207, 2972. " Safety Ingectxon (K603)

(4) Shs. 1204, 1205, 1209, 2286 Safety Injection (K608)

(5) Shs. 1988, 2639, 2641, 3177 - Safety Injection (K610)

(6) Shs. 1933, 1944, - Loop 1 AFW Isolation (K615)

(7) Shs. 1934, 1945 Loop 2 AFW Isolation (K616)

(8) Shs. 1935, 1946 Loop 3 AFW Isolation (K617)

(9) Shs. 286, 421, 2253, 2254, 2703 - Containment Phase A Isolation (K622)

(10) Shs. 416, 418, 458 " Safety Injection (K740)

(11) Shs. 418, 1039 - RWST Lo-Lo Level (K739, K741)

(12) Shs. 317 Safety Injection (K636)

c. Vendor'Drawings.'1)

EBASCO Dwg. 1364-46575 Sheets 9, 10, ll (2) EBASCO Dwg. 1364-2776 Sheets 16-31 (3) EBASCO. Dwg. 1364-46576 Sheets 9, 10, 11

6. Solid State Protection System Equipment Reference Manual PRL Volume 1.
7. Solid State Protection System Equipment Reference Manual PRL Volume 2.

OST-10&3 Rev. 3 Page 4 of 52

Osl 3.0 PRERE UISITES

1. Review the Control Room Status File and verify that the systems being tested are aligned in a manner that will support the performance of this test.
2. The performance of this OST has been coordinated with other plant evolutions such that the minimum operability requirements of Technical Specifications will continue to be satisfied during the performance of the OST or the appropriate LCO's have been written.
3. Any special tools and equipment required per Section 5.0 of this procedure have been obtained.

Instrumentation needed for the performance of this test is free of deficiency tags that affect instrument indication.

5. IGC support required for this test has been obtained.
6. Electrical Maintenance support required for this test has been obtained.

7.- All switches in the Safeguards Test Cabinet are in the "NORMAL" position.

CAUTION This procedure involves an infrequent test or evolution with the potential to reduce margins of safety or introduce unwanted transients or accidents if performed incorrectly, depending on the specific plant conditions at the time of the test. Conditions and management involvement are documented on PLP-100-1. 'A 7a. A PLP-100 shift brief has been performed by the applicable level of management,.

8. The Shift Foreman has given permission to perform this OST and all prerequisites are met.

Shift Foreman Date OST-1083 Rev. 3 Page 5 og 52 r

OS1 4.0 PRECAUTIONS AND LIMITATIONS Prior to performing safeguards actuations, plant configuration should be established to allow for minimum disturbance to plant operation (i.e., valve positions, starting of redundant equipment).

AC OST-1083 Rev. 3 Page 5a of 52

(

Osl 4.0 PRECAUTIONS AND LIMITATIONS (continued)

2. Before starting a new step, clear all trips and reset any associated alarms, lights and relays unless the procedure specifies otherwise.
3. If any response is not as required, stop procedure and immediately notify the Shift Foreman for resolution.
4. During Solid Plant Operation, steps that isolate charging and/or letdown should not be performed unless the alternate pressure= control methods are readily available and the operators are aware of expected pressure fluctuations.
5. Steps within a procedure section must be completed in the order written before the next section is started.

5.0 TOOLS AND E UIPMENT

1. Headsets or Radios (as required),,
2. Voltmeter Fluke 8600A (or equivalent)
3. Stopwatch Fischer Model 14-649-5 (or equivalent)
4. Electrical Jumper(s)
5. Ronan X-85 Calibrator or equivalent (as required per drained S/G) 6.0 ACCEPTANCE CRITERIA
1. For Go Circuit testing, all components listed respond as specified after the slave relay is energized and after it is reset.
2. Each device that was activated shall be documented as to the condition left at the completion of the section.

7 ' PROCEDURE STEPS NOTE: To reopen isolation valves after. test, control switch for motor"operated valve must be placed momentarily to the SHUT position, then to OPEN position to reset seal"in relays. The associated flow control valve of the opposite header.gay then also be re-opened.

OST-1083 Rev. 3 Page 6 of 52

Osl 7.1 Train A Safet In'ection Go Circuit (K601) (continued)

2. Establish phone communications between operations in the Hain Control Room and the Safeguards Test Cabinet.

CAUTION At SSPS (A) Output Cabinet No. 1 have an I&C Technician connect a multimeter across Terminal 1 of TB604 and ground and Terminal 2 of TB604 and ground to ensure no voltage is present which may damage multimeter.

3. At SSPS (A) Output Cabinet No. 1, have an I&C Technician connect a multimeter across terminals 1 and 2 of TB604 and verify contacts 11 and 12 of Output Relay K601 are open.
4. Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman,'s approval, commence slave rel,ay test.
5. Coordinate with the diesel operator to prelube the Diesel Generator and energize slave relay K601 by turning test switch S907 clockwise then depressing momentarily. (Test switch will spring return to the normal left-hand position.)
6. Verify the following equipment starts or repositions as follows;
a. Diesel Generator 1A STARTS
b. 1CS-214, CSIP's Miniflow Isolation SHUT
c. 1SI-248, Accumulator 1C-SA Discharge OPEN
d. 1SI-1, CSIP's to BIT Isolation OPEN
e. 1SP-227, S/G 1C-SN Sample CNMT Isol SHUT 7 ~ At SSPS (A) Output Cabinet No. 1, have an I&C Technician connect a multimeter across Terminals 1 and 2 of TB604 and verify contacts 11 and 12 of Output Relay K601 are closed. This verifies the DG 1A-SA Breaker 106 trip clrcul t ~

OST-1083 Rev. 3 Page 8 of 52

OS1 7.1 Train A Safet In 'ection Go Circuit (K601) (continued)

8. Position reset switch S921 to RESET.
9. Verify the following equipment status'.
a. Diesel Generator 1A-SA RUNNING H

s ICS-2l4, CSIP's Miniiloe Isolation SHUT

c. 1SI-248, Accumulator 1C-SA Discharge SHUT
d. 1SI-1, CSIP's to BIT Isolation OPEN
e. 1SP-227, S/GP 1C-SN Sample CNHT Isol SHUT
10. At SSPS (A) Output Cabinet No. 1, have an 1&C Technician connect a multimeter across terminals 1 and 2 of TB604 and verify contacts 11 and 12 of Output Relay K601 are open.
11. Direct the I&C Technician to disconnect the multimeter from terminals 1 and 2 of TB604 in SSPS (A) Output Cabinet No. 1.

Technician Verifier

12. Secure Diesel Generator 1A-SA per OP-155.
13. Realign the following valves as required for plant operations'.
a. 1CS-214, CSIP's Miniflow Isolation Final Position Positioner Verifier
b. 1SI-248, Accumulator 1C-SA Discharge Final Position 'ositioner Verifier
c. 1SI-1, CSIP's to BIT Isolation Final Position Positioner Verifier OST-1083 Rev. 3 Page 9 of 52

OS1 7.1 Train A Safet In'ection Go Circuit (K601) (continued)

d. 1SP-227, S/G 1C-SN Sample CNMT Isolation Final Position Positioner Verifier
e. 1SI-248 breaker on MCC 1A21-SA Cub. 3D Final Position Positioner Verifier
14. Verify Accumulator 1C-SA is repressurized once discharge valve 1SI-248 is SHUT if depressurized in a previous step.

7.2 Train A Safet In'ection Go Circuit (K602)

CAUTION Ensure the CSIP suction valves are aligned properly to maintain adequate suction flow to the pumps during the test.

1. Direct the I&C Technician to install jumper between terminals 21 and 35 in ARP"19A (SA)F3 to defeat the SG Low Pressure interlock for 1BD-49 unless already done by OP"183.03. (Ref. 2.5.b.2) 2~ If any Steam Generator level is below 38.5X, direct the 1&C Technician to lift the lead at Terminal 60 in ARP-19A (SA) F3 to defeat the S.G. low level interlock for 1BD-49.

3 E Prepare the following equipment for testing as follows.'

~ 1CS-291, RWST to CSIP Isolation SHUT

b. 1CS-165, VCT Outlet Isolation OPEN C~ 1CC-114, CCW to Sample HX Isolation OPEN
d. 1BD-49, S/G 1C-SN Blowdown CNMT Isol OPEN
e. 1CC-304, CCW to Gross Failed Fuel Detector OPEN
f. SGWLU pump for C S/G SECURED OST-1083 Rev. 3 Page 10 of 52

OS1 7.2 Train A Safet In'ection - Go Circuit (K602) (continued)

4. Have the I&C Technician perform the following steps:
a. At SSPS (A) Output Cabinet No. 1, verify the voltage between Time Delay Relay TD1 Terminal 6 (+)

and Logic Ground (-) is 48 + 2 VDC.

b. At SSPS (A) Output Cabinet No. 1, verify the voltage between Time Delay Relay TD1 Terminal 2 (+)

and Logic Ground (-) is 0 + 2 VDC.

c. At SSPS (A) Logic Cabinet, connect the multimeter between TB505-7 (+) and Signal Ground (-).
d. If a Reactor Trip Signal is present as a result of a drained steam generator(s), lift and tape transmitter field leads and install Ronans (transmitter simulator) on the following points to clear the Lo-Lo Level Bistable on the appropriate steam generator(s):

'A'team Generator PIC-2 TBF 10 and 11 PIC-3 TBF 10 and 11

'B'team Generator PIC-2 TBF 13 and 14 V

PIC-3 TBF 13 and 14

'C'team Generator PIC-2 TBF 16 and 17 PIC-3 TBF 16 and 17

e. Adjust Ronan(s) as necessary to clear the Lo-Lo Level Bistables for the appropriate steam generator.

OST-1083 Rev. 3 Page 11 of 52

Os 1 7.2 Train A Safet In 'ection '- Go circuit (K602) (continued)

NOTE: To prevent flashing in Sample HX, secure sampling prior to energizing slave relay K602.

5. Establish phone communications between operations in the Main Control Room and Safeguards Test Cabinet.
a. Close then reopen the Reactor Trip Beakers as needed to reset the P-4 interlock.
6. Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's approval, commence the slave relay test.
7. Simultaneously start a stop watch to time the SI Time Delay Relay and energize slave relay K602 by turning test switch S908 clockwise and depressing momentarily.

(Test switch will spring return to the normal left"hand position.)

NOTES The following two steps must be performed within 60 seconds after K602 has been energized to verify SI will not reset.

8. Place the Safety Injection Train A Reset Switch to RESET.
9. Verify the SI RESET AUTO-SI BLOCKED Light is OFF at Bypass Permissive Light Box (BPLB).
10. Veri.fy the following valves reposition as follows:

a ~ 1CS"291, RWST to CSIP Isolation OPEN

b. 1CS-165, VCT,Outlet Isolation SHUT C ~ 1CC-114, CCW to Sample HX Isolation SHUT
d. 1BD-49, S/G 1C-SN Blowdown CNMT Isol SHUT
e. 1CC-304, CCW to Gross Failed Fuel Detector SHUT OST-1083 Rev. 3 Page 12 of 52

OS1 7.2 Train A Safet In'ection - Go circuit (K602) (continued)

11. Verify the voltage on the multimeter connected in Step 7.2.4 increases to 48 + 2 VDC one minute + 3 Sec. after slave relay K602 is energized.

VDC T'e

12. Place the Safety Injection Train A Reset switch to Reset.
13. Verify the voltage on the multimeter connected in Step 7.2.4 decreases to 0 + 2 VDC.

VDC

14. Verify the SI RESET AUTO-SI BLOCKED Light is ON at Bypass Permissive Light Box (BPLB).
15. Position Test Switch S921 to Reset.
16. Verify the following valve status.'.

1CS-291, RWST to CSIP Isolation OPEN

b. 1CS-165, VCT Outlet Isolation SHUT
c. 1CC-114, CCW to Sample HX Isolation SHUT
d. 1BD-49, S/G 1C-SN Blowdown CNMT Isol SHUT
e. 1CC-304, CCW to Cross Failed Fuel Detector SHUT
17. Direct the I&C Technician to disconnect the multimeter connected in Step 7.2.4.

Technician Verifier

18. Direct the I&C Technician to remove jumper installed in Step 7.2.1 unless required by OP-183.03.

Technician Verifier OST-1083 Rev. 3 Page 13 of 52

OS1 7.2 Train A Safet Iniection Go circuit (K602) (continued)

19. Direct the I&C Technician to reconnect the lead lifted in Step 7.2.2 (Mark this step NA if Section 7.3 is to be performed next).

.echnician Verifier

20. Reposition the following valves as required for plant operations:

CAUTION 1CS-165, VCT Outlet Isolation, must be reopened before closing 1CS-291, RWST to CSIP Isolation, to prevent losing suction to the CSIP's.

a. 1CS-165, VCT Outlet Isolation Final Position Positioner Verifier
b. 1CS-291, RWST to CSIP Isolation Final Position Positioner Verifier
c. 1CC-114, CCW to Sample HX Isolation Final Position Positioner Verifier
d. 1BD-49, S/G 1C-SN BLovdovn CNMT Isolation Final Position Positioner Verifier
e. 1CC-304, CCW to Cross Failed Fuel Detector Final Position Positioner Verifier
21. Return the SGWLU System to desired lineup per OP-183.03.

OST"1083 Rev. 3 Page 14 of 52

OS1 7.2 Train A Safet In 'ection - Go Circuit (K602) (continued)

22. Remove Ronans and land leads lifted in Step 7.2.4.d on the appropriate points:

'A'team Generator PIC-2 TBF 10 and 11 TECHNICIAN VERIFIER PIC-3 TBF 10 and 11 TECHNICIAN VERIFIER

'B'team Generator PIC-2 TBF 13 and 14 TECHNICIAN VERIFIER PIC-3 TBF 13 and 14 TECHNICIAN VERIFIER

'C'team Generator PIC-2 TBF 16 and 17 TECHNICIAN VERIFIER PIC-3 TBF 16 and 17 TECHNICIAN VERIFIER 7.3 Train A Safet In ection - Go Circuit (K603)

CAUTION The following test isolates the normal charging line.

1. Direct the I6C Technician to install jumper between terminals 44 and 58 in ARP-19A (SA)F3 to defeat the SG Low Pressure interlock for 1BD-11 unless already done by OP-183.01. (Ref. 2.5.b.3)

OST-1083 Rev. 3 Page 15 of 52

Os 1 7.3 Train A Safet In'ection - Go Circuit (K603) (continued)

2. If any Steam Generator level is below 38.5X, direct the I&C Technician to lift the lead at terminal 60 in ARP-19A (SA) F3 to defeat the S.G. low level interlock for 1BD-11 (Mark this step NA if. the lead was not reconnected in Section 7.2).

-

3. Prepare the following equipment for testing as follows'.

a ~ 1CS-238, Charging Line Isolation OPEN

b. 1SI-4, BIT Outlet Isolation SHUT C ~ 1SI-246, Accumulator 1A-SA Discharge SHUT
d. 1SI-246, Control Switch SHUT
e. 1BD-11, S/G 1A-SN Blowdown Isolation OPEN 1SI-246 Breaker on MCC 1A21-SA Cob.e SC SHUT g ~ 1SI-1, CSIP's to BIT Isolation SHUT
h. 1SI-2, CSIP's to BIT Isolation SHUT 1 ~ SGWLU pump for A SIG SECURED
j. Train A Ventilation'.

(1) 3CZ-B1(SA-1), CR Norm Intake OPEN (MCB)

(2) 3CZ-B3(SA-1), CR Norm Exh OPEN (MCB)

(3) E-9(1A-SA), Normal Exhaust Fan ON (MCB)

(4) 3CZ-BS(SA-l), Equip Prot Room Air OPEN (AEP-1) Inlet Vlv (5) 3CZ-B7(SA"1), Elec Equip Prot Room OPEN (AEP-1) Vent Isol L

(6) 3AC-D4(SA-~)s RAB Swgr Rm A Ret SHUT (AEP-1) Air Damper (7) E-28(1A-SA), Swgr Rm A Exh Fan ON (AEP-1)

OST-1083 Rev. 3 Page 16 of 52

Osl 7.3 Train A Safet In 'ection - Co Circuit (K603) (continued)

(8) E-28(1B-SA), Swgr Rm A Exh Fan ON (AEP-1)

(9) 3AC-D3(SA-1), Swgr Rm. A OAI 1st 1 OPEN (AEP-', SLB-11)

(10) E-10(1A-SA), Elec Equip Rm Exh Fan ON (A P-1)

(11) 3CZ-Bll(SA-1), CR Em Filt OAI Vlv OPEN (MCB)

(12) 3CZ"B9(SA-1) CR Em Filt OAI Vlv (MCB) OPEN (13) R-13(l&2A-NNS), ARR For Comp/Comm OFF (AEP-3) Rm (14) R-13(1&2B-NNS) ARR For Comp/Comm Rm (AEP-3) OFF (15) CK-B7-1&2, Comp Rm Normal Intake OPEN (AEP-3)

(16) CK"B8-1&2, Comp Rm Normal Intake OPEN (AEP-3)

(17) 3CZ-D16(SA"1), CR EM Filt Recirc SHUT (MCB)

NOTE: Accumulator 1A-SA must be depressurized or at the same pressure as the RCS to prevent injection of water into the loops. If necessary, use 1SI"295 and 1SI-298 to reduce the pressure in the accumulator.

4. Verify Accumulator 1A"SA pressure is less than or equal to RCS pressure.

5 Establish phone communications between operations in the Main Control Room and the Safeguards Test Cabinet.

6. Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's approval, commence the slave relay test.

OST-1083 Rev. 3 Page 17 of 52

Osl 7.3 Train A Safet In 'ection - Go Circuit (K603) (continued)

7. Energize slave relay K603 by turning test switch S909 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)
8. Verify the equipment, realigns as follows:

a ~ 1CS-238, Charging Line Isolation SHUT

b. 1SI-4, BIT Outlet Isolation OPEN C ~ 1SI-246, Accumulator 1A-SA Discharge OPEN 1BD-11, S/G lA"SN Blowdown Isolation SHUT
e. Train A Ventilation:

(1) 3CZ-B1(SA-l), CR Norm Intake SHUT (MCB)

(2) 3CZ-B3(SA-1), CR Norm Exh SHUT (MCB)

(3) E-9(1A-SA) Normal Exhaust Fan OFF (MCB)

(4) 3CZ-B5(SA-1), Equip Prot Room Air SHUT (AEP-1) Inlet Vlv (5) 3CZ-B7(SA-1), Elec Equip Prot Room SHUT (AEP-1) Vent Isol (6) 3AC-D4(SA-1), RAB Swgr Rm A Ret OPEN (AEP-1) Air Damper (7) E-28(lA-SA), Swgr Rm A Exh Fan OFF (AEP-1)

(8) E-28(1B-SA), Swgr Rm A Exh Fan OFF (AEP-1)

(9) 3AC-D3(SA-1), Swgr Rm A OAI Isol SHUT (AEP-l, SLB-11)

(10) E-10(lA-SAQ, Elec Equip Rm Exh Fan OFF (AEP-1)

(ll) 3CZ-Bll(SA-1), CR Emer Filt OAI SHUT (MCB) Vlv OST-1083 Rev. 3 Page 18 of 52

OS1 7.3 Train A Safet in'ection Go Circuit (K603) (continued)

(12) 3CZ-B9(SA-1), CR Emer Filt OAI Vlv SHUT (MCB)

(13) R-13(l&"A-NNS), ARR For Comp/Comm ON (AEP-3) Rm (14) R-13(1&2B-NNS), ARR For Comp/Comm ON (AEP-3) Rm (15) CK-B7-1&2, Comp Rm Normal Intake SHUT (AEP-3)

(16) CK-B8-1&2, Comp Rm Normal Intake SHUT (AEP-3)

(17) 3CZ-D16(SA-1), CR Em Filt Recirc OPEN (MCB)

9. Position reset svitch S921 to RESET.
10. Reset the Control Room Isolation Signal ll. Prepare following equipment for testing as follows'.
a. Train A ventilation (1) CK-B6 (1&2), Smoke Pur In Comp Rm OPEN (AEP-3)

(2) ES-7(1&2-NNS), Smoke Pur Exh Fan ON (AEP"3)

(3) ES-1A, Purge Exhaust Fan ON (MCB)

(4) 3CZ-B17(SA-1), CR Purge Makeup Vlv OPEN (MCB)

(5) 3CZ-B13(SA-1), CR Purge Exh OPEN (MCB)

12. Energize slave relay K603 by turning test switch S909 clockwise and depressing momentarily. (Test svitch vill spring return to the 'Normal left-hand position).

OST-1083 Rev. 3 Page 19 of 52

OSl 7.3 Train A Safet In'ection Go Circuit (K603) (continued)

13. Verify the following equipment realigns as follows:
a. Train A ventilation (1) CK-B6 (1&2), Smoke Pur In Comp Rm SHUT (2) ES-7(1&2-NNS), Smoke Pur Exh Fan OFF (3) ES-lA, Purge Exhaust Fan OFF (4) 3CZ-B17(SA-1), CR Purge Makeup Vlv SHUT (5) 3CZ-B13(SA-1), CR Purge Exh SHUT
14. Position reset switch S921 to RESET.
15. Verify the following equipment status:

1CS-238, Charging Line Isolation SHUT

b. 1SI-4, BIT Outlet Isolation OPEN C ~ 1SI-246, Accumulator lA-SA Discharge SHUT
d. 1BD-'ll, S/G 1A-SN Blowdown Isolation SHUT
e. Train A Ventilation (1) 3CZ-Bl(SA-1), CR Norm Intake SHUT (MCB)

(2) 3CZ-B3(SA-1), CR Norm Exh SHUT (MCB)

(3) E-9(1A-SA), Normal Exhaust Fan OFF (MCB)

(4) 3CZ-B5(SA-1), Equip Prot Rm Air SHUT (AEP"1) Inlet Vlv (5) 3CZ-B7(SA-l), Elec Equip Prot Rm SHUT (AEP-1) Vent Isol I

(6) 3AC-D4(SA-1')p RAB Swgr Rm A Ret OPEN (AEP-1) Damper (7) E"28(lA-SA), Swgr Rm A Exh Fan OFF (AEP-1)

OST-1083 Rev. 3 Page 20 of 52

OS1 7.3 Train A Safet In'ection - Go Circuit (K603) (continued)

(8) E-28(1B-SA), Swgr Rm A Exh Fan OFF (AEP-1) 3AC-D3(SA-1), Swgr Pw A OAI Isol SHUT (AEP-1, SLB-ll)

(10) E"10(1A-SA), Elec Equip Rm Exh Fan OFF (AEP-1)

(11) 3CZ-B17(SA-1), CR Purge Makeup Vlv SHUT (MCB)

(12) 3CZ-B11(SA-1), CR Emer Filt OAI SHUT (MCB) Vlv (13) R-13(1&2A-NNS), ARR for Comp/Comm Rm (AEP-3) ON (14) R-13(1&2B-NNS), ARR for Comp/Comm Rm (AEP-3) ON (15) ES-7(l&2X-NNS), Smoke Purge Exh OFF Fan (AEP-3)

(16) CK"B7-1&2, Comp Rm Normal Intake SHUT (AEP-3)

(17) CK-B8-1&2,Comp Rm Normal Intake SHUT (AEP-3)

(18) CK-B6-1&2, Smoke Pur Intake SHUT (AEP"3)

(19) 3CZ-D16(SA-1), CR Em Filt Recirc OPEN (MCB)

(20) 3CZ"B13(SA-1), CR Purge Exh SHUT (MCB)

(21) ES-1A, Purge Exhaust Fan OFF (MCB)

(22) 3CZ-B9(SA"1), CR Emer Filt OAI Vlv (MCB) . SHUT

16. Direct the I&C Technician to remove jumper installed in Step. 7.3.1 unless required by OP-183.01 Verifier

'echnician OST-1083 Rev. 3 Page 21 of 52

OS1 7.3 Train A Safet Iniection Go Circuit (K603) (continued)

17. Direct the I&C Technician to reconnect the lead lifted in Step 7.3.2 (Mark this Step NA if Section 7.4 is to be performed next).

Techni"ian Verifier

18. Realign the following equipment as required for plant operations',
a. 1CS-238, Charging Line Isolation Final Position Positioner Verifier
b. 1SI-4, BIT Outlet Isolation Final Position Positioner Verifier
c. 1SI-246, Accumulator lA-SA Discharge Final Position Positioner Verifier
d. 1BD-ll, S/G 1A-SN Blowdown Isolation Final Position Positioner Verifier
e. 1SI-246 Breaker on MCC 1A21-SA Cub. 5C Final Position Positioner Verifier
f. Train A Ventilation (1) 3CZ-B1(SA-1), CR Norm Intake (MCB)

Final Position Positioner Verifier (2) E-9(lA-SA), Normal Exhaust Fan (MCB)

Final Position Positioner Verifier OST-1083 Rev. 3 Page 22 of 52

OS1 7.3 Train A Safet In ection " Go Circuit (K603) (continued)

(3) 3CZ-B3(SA-1), CR Norm Exh (HCB)

Final Position Positioner Verifier (4) 3CZ-B5(SA-I), Equip Pro" Room Air Inlet Valve (AEP-1)

Final Position Positioner Verifier (5) 3CZ-B7(SA-l), Elec Equip Prot Rm Vent Isol (AEP-1)

Final Position Positioner Verifier (6) 3AC-D4(SA"1), RAB SWGR Rm A Ret Air Damper (AEP-1)

Final Position Positioner Verifier (7) E-28(1A-SA), SWGR Rm A Exh Fan (AEP-1)

Final Position Positioner Verifier (8) E-28(lB-SA), SWGR Rm A Exh Fan (AEP-1)

Final Position Positioner Verifier (9) 3AC-D3(SA-1), SWGR Rm A OAI Isol (AEP"1, SLB-11)

Final Position Positioner Verifier (10) E-10(1A-SA), Elec Equip Rm Exh Fan (AEP-1)

Final Position Positioner Verifier

( 11) 3CZ-B17 ( SA-1), CR Purge Nakeup Vlv (MCB)

Final Position Positioner Verifier OST-1083 Rev. 3 Page 23 of 52

Osl 7.3 Train A Safet In ection - Co Circuit (K603) (continued)

(12) 3"2-811(SA-1), CR Emer Filt OAI Vlv (MCB)

Final Position Positioner Verifier (13) R-13(l&2A-NNS), ARR for Comp/Comm Rm (AEP-3)

Final Position'ositioner Verifier (14) ES-7(1&2X-NNS), Smoke Pur Exh Fan (AEP-3)

Final Position Positioner Verifier (15) CK-B7-1&2, Computer Room Normal Intake (AEP-3)

Final Position Positioner Verifier (16) CK-B8-1&2, Computer Room Normal intake (AEP"3)

Final Position Positioner Verifier (17) CK-B6-1&2, Smoke Pur Intake (AEP-3)

Final Position Positioner Verifier (18) 3CZ-D16(SA-l), CR Em Filt Recirc (MCB)

Final Position Positioner Verifier (19) 3CZ-B13(SA-1), CR Purge Exh (MCB)

Final Position Positioner Verifier (20) ES-1A, Purge Exhaust Fan Final Position Positioner Verifier OST-1083 Rev. 3 Page 24 of 52

Osl 7.3 Train A Safet In'ection - Go Circuit (K603) (continued)

(21) 3CZ"B9(SA-1), CR Emer Filt OAI Vlv Final Position Positioner Verifier (22) R-13(162B) ARR for Comp/Comm Rm (AEP-3)

Final Position Positioner Verifier

]9. Verify Accumulator 1A-SA is repressurized once discharge valve 1SI-246 is SHUT if depressurized in a previous step.

20. Return the SGMLU System to the desired lineup per OP-183.01.

7.4 Train A Safet In'ection Go Circuit (K608)

CAUTION The perEormance of this test diverts the A Train ESM Return Header to the Auxiliary Reservoir. This test should not be performed if the Circulating Mater System has been recently chlorinated (check with Chemistry to determine restrictions) OR if the CTMU System is not available for makeup to the cooling tower basin. Maintain maximum makeup Elow and monitor basin level to avoid the cavitation of a Service Water Pump.

1. Direct the I&C Technician to install jumper between terminals 93 and 107 in ARP-19A (SA)F3 to defeat the SG Low Pressure interlock Eor 1BD-30 unless already done by OP-183.02. (Ref. 2.5.b.2)
2. If any Steam Generator level is below 38.5X, direct the ISC Technician to lift the lead at terminal 60 in ARP" 19A (SA) F3 to defeat the SG low level interlock Eor 1BD-30 (Mark this sXep NA if lead not reconnected in Section 7.3) ~

OST-1083 Rev. 3 Page 25 of 52

OS1 7.3 Train A Safet In 'ection " Go Circuit (K603) (continued)

3. Prepare the following equipment for testing as fcl.lows:
a. 1SW-270, ESW Hdr A Return to Aux Rsvr SHUT B

s 1BD-30, S/G IE-SN Bloudoun CNHT Isol OPEN

c. 1SP-222, S/G 1B-SN Sample CNMT Isol OPEN
d. 1SP-217, S/G 1A"SN Sample CNMT Isol OPEN
e. SGWLU pump for B S/G SECURED 4e Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.
5. Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's approval, commence the slave relay test.

NOTE: 1SM-270 will cycle from shut to open then back to shut when K608 is energized.

6. Energize slave relay K608 by turning test switch S910 clockwise and depressing momentarily. (Test s~itch will spring return to the normal left"hand position.)
7. Verify the following valves realign as follows',
a. 1SM-270, ESM Hdr A Return to Aux Rsvr OPEN THEN SHUT U.

IBD-30, S7G IB-SN Bloudoun CNHT Isol SHUT

c. 1SP-222, S/G 1B-SN Sample CNMT Isol SHUT
d. 1SP-217, S/G lA-SN Sample CNMT Isol SHUT
8. Position reset switch S921 to RESET.
9. Verify the following valve status'.
a. 1SW-270, ESW Hdr A Return to Aux Rsvr SHUT OST-1083 Rev. 3 Page 26 of 52

Osl 7.4 Train A Safet In ection - Go Circuit (K608) (continued)

b. 1BD-30, S/G 1B"SN Bio+down CNMT Isol SHUT
c. 1SP-222, S/G 1B-SN Sample CNMT Isol SHUT
d. 1SP-217, S/G 1A-SN Sample CNMT Isol SHUT
10. Direct the I&C Technician to remove jumper installed in Step. 7.4.1 unless required by OP-183.02.

Technician Verifier

11. Direct the 16C Technician to reconnect the lead lifted in Step 7.4.2.

Technician Verifier

12. Reposition the following valves as required for plant operations:
a. 1SW-270, ESW Hdr A Return to Aux Rsvr Final Position Positioner Verifier
b. 1BD-30, S/G 18-SN Blovdown CNMT Isol Final Position Positioner Verifier
c. 1SP-222, S/G 1B-SN Sample CNMT Isol Final Position Positioner Verifier
d. 1SP-217, S/G lA-SN Sample CNMT Isol Final Position Positioner Verifier
13. Return the SGWLU System to the desired lineup per OP-183.02.

OST-1083 Rev. 3 Page 27 of 52

OS1 7.5 Train A Safet In'ection Go Circuit (K610)

1. Prepare the equipment for testing as follows:
a. Diesel Generator 1A-SA Prepare for startup per OP-155
b. 1CH-149, Chill Water to NESSR Fan Clrs OPEN
c. 1CH-197, Chill Water to NESSR Fan Clrs OPEN
d. ALB-23-3-7, RAB NORM EXE XBOL DMPR TRBL OPP
e. A Train RAB Normal Exhaust Dampers:

(1) AV-D3SA-1 OPEN (2) AV-D5SA-1 OPEN (3) AV-D7SA-1 OPEN (4) AV-D9SA-1 OPEN (5) AV-D11SA-1 OPEN (6) AV-D13SA-1 OPEN (7) AV-D15SA-1 OPEN (8) AV-D17SA-1 OPEN (9) AV"D19SA-1 OPEN (10) AV-D21SA-1 OPEN (11) AV-D23SA-1 OPEN (12) AV"D25SA-1 OPEN (13) AV-D27SA-1 OPEN (14) AV-D29SA-1 OPEN (15) AV-D31SA-1 OPEN (16) AV-D33SA-1 OPEN AV-D35SA-1

'17)

OPEN (18) AV-D37SA-1 OPEN OST"1083 Rev. 3 Page 28 of 52

OS1 7.5 Train A Safet In ection - Go Circuit (K610) (continued)

(19) AV-D52SA-1 OPEN (20) AV-D58SA-1 OPEN (21) AV-D62SA-1 OPEN (22) AV-D66SA"1 OPEN (23) AV-D70SA-1 OPEN (24) AV-D74SA-1 OPEN (25) AV-D78SA-1 OPEN (26) AV-D82SA-1 OPEN (27) AV-D86SA-1 OPEN

2. Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.
3. Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's approval, commence the slave relay test.
4. Coordinate with the diesel operator to prelube the Diesel Generator and energize slave relay K610 by turning test switch S912 clockvise and depressing momentarily. (Test switch vill spring return to the normal left"hand position.)

5'erify the equipment realigns as follows:

Diesel Generator 1A-SA STARTS

b. 1CH-149, Chill Water to NESSR Fan Clrs SHUT C ~ 1CH-197, Chill Water to NESSR Fan Clrs SHUT

'd ~ ALB-23-3-7, RAB CFORM EXH ISOL DMPR TRBL ON

e. A Train RAB Normal Exhaust Dampers:

(1) AV-D3SA-1 SHUT (2 ) AV-D5SA-1 SHUT OST-1083 Rev. 3 Page 29 of 52

OS1 7.5 Train A Safet In'ection - Go Circuit (K610) (continued)

(3) AV-D7SA-1 SHUT (4) AV-D9SA-1 SHUT (5) AV-011SA-1 SBUT (6) AV-D13SA-1 SHUT (7) AV-D15SA-1 SHUT (8) AV"D17SA-1 SHUT (9) AV-D19SA-1 SHUT (10) AV-D21SA-1 SHUT (11) AV-D23SA-1 SHUT (12) AV-D25SA-1 SHUT (13) AV-D27SA-1 SHUT (14) AV-D29SA-1 SHUT (15) AV-D31SA-1 SHUT (16) AV-D33SA-1 SHUT (1/) AV-D35SA-1 SHUT (18) AV-D37SA-1 SHUT (19) AV-D52SA-1 SHUT (20) AV-D58SA-1 SHUT (21) AV-D62SA-1 SHUT (22) AV-D66SA"1 SHUT (23) AV-D70SA-1 SHUT (24) AV-D74SA-1 SHUT (25) AV-D78SA-.3. SHUT (26) AV-D82SA-1 SHUT (27) AV-D86SA-1 SHUT

6. Position reset switch S921 to RESET.

OST-1083 Rev. 3 Page 30 of 52

S Osl 7.5 Train A Safet In'ection - Go Circuit (K610) (continued)

7. Verify the folloving equipment status'.
a. Diesel Generator 1A-SA RlJNN ING b." 1CH-149, Chill Water to NESSR Fan C's SHUT C ~ 1CH-197, Chill Water to. NESSR Fan Clrs SHUT
d. ALB-23-3-7, RAB NORM EXH ISOL DMPR TRBL OFF
e. A Train RAB Normal Exhaust Dampers:

(1) AV-D3SA-1 ,OPEN (2) AV-D5SA-1 OPEN (3) AV-D7SA"1 OPEN (4) AV"D9SA-1 OPEN (5) AV-D11SA-1 OPEN (6) AV-D13SA-1 OPEN (7) AV-D15SA-1 OPEN (8) AV-D17SA-1 OPEN (9) AV-D19SA-1 OPEN (10) AV-D21SA-1 OPEN (11) AV-D23SA-1 OPEN (12) AV-D25SA-1 OPEN (13) AV-D27SA-1 OPEN (14) AV-D29SA-1 OPEN (15) AV"D31SA-1 OPEN (16) AV-D33SA-1 OPEN (17) AV-D35SA~l

': OPEN "C.

(18) AV-D37SA-1 OPEN (19) AV"D52SA-1 OPEN (20) AV-D58SA-1 OPEN OST-1083 Rev. 3 Page 31 of 52

OS1 7.5 Train A Safet ln 'ection Go Circuit (K610) (continued)

(21) AV-D62SA-1 OPEN (22) AV-D66SA-1 OPEN (23) AV-D70SA-1 OPEN (24) AV-D74SA-'PEN (25) AV-D78SA-1 OPEN (26) AV-D82SA-1 OPEN (27) AV-D86SA-1 OPEN

8. Secure the 1A-SA Diesel Generator per OP-155.
9. Return RAB Normal Ventilation to service per OP-172, RAB HVAC System.
10. Realign the following equipment as required for plant operations:
a. 1CH-149, Chilled Water to NESSR Fan Coolers Final Position Positioner Verifier
b. 1CH-197, Chilled Water to NESSR Fan Coolers Final Position Positioner Verifier OST-1083 Rev. 3 Page 32 of 52

OS1 7.6 Train A Safet In'ection - Go Circuit (K636)

CAUTION 1CS-745, CSIP A Alt Miniflow Val.ve, must be CLOSED prior to opening 1CS-746 to prevent lifting the Miniflow Line relief valve.

1. Prepare the valves for testing as follows:
a. 1CS-746, CSIP A Alt Miniflow Valve SHUT
b. 1CS-745, CSIP A Alt Miniflow Valve SHUT 2 ~ Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.
3. Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's approval, commence slave relay test.
4. Energize slave relay K636 by turning test switch S911 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)
5. Verify the valves realign as follows.
a. 1CS-746, CSIP A Alt Miniflow Valve OPEN
6. Position reset switch S921 to RESET.
7. Verify the following valve status.
a. 1CS-746, CSIP A Alt Miniflow Valve OPEN OST-1083 Rev. 3 Page 33 of 52

Osl 7,6 Train A Safet Zn ection Go Circuit (K636) (continued)

CAUTION 1CS-745, CSIP A Alt Miniflow Valve, must be CLOSED prior to opening 1CS-746 to prevent lifting the Miniflow Line relief valve.

8. Reposition the following valves as required for plant operations:
a. 1CS-745, CSIP 1A-SA Alternate Miniflow Valve Final Position Positioner Verifier
b. 1CS-746, CSIP lA-SA Alternate Miniflow Valve Final Position Positioner Verifier OST"1083 Rev. 3 Page 34 of 52

Os 1 7 ' Train A Containment Isolation Phase A - Go Circuit (K622)

NOTE: The actuation of this slave relay will cause one letdown orifice isolation valve to SHUT.

1. Prepare the equipment for testing as follows:
a. 1CS-9, Letdown Orifice C Isolation OPEN
b. 1SI-263, Accumulator Test Return Isol OPEN
c. 1SW-231, NNS CENT Peo Cooler SW Supply OPEN
d. 1SW-2402 NNS CNMT Fan Cooler SW Return OPEN
e. CNMT Fan Coolers:

(1) AH-37 (1A-NNS) ON (2) AH-37 (1B-NNS) ON (3) AH-38 (1A-NNS) ON (4) AH-38 (1B-NNS) ON (5) AH-39 (1A-NNS) ON (6) AH-39 (18-NNS) ON

2. Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.

NOTE: Monitor CNMT area temperatures and RCP motor and winding temperatures while CNMT Fans are out of service.

3 ~ Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's approval, commence the slave relay test.

4. Energize slave relay K622 by turning test switch S916 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)

5 ~ Verify the equipment realigns as follows.'.

1CS-9, Letdown Orifice C Isolation SHUT

b. 1SI-263, Accumulator Test Return Isol SHUT OST-1083 Rev. 3 Page 35 of 52

0$ 1 7.7 Train A Containment Isolation Phase A - Go Circuit (K622)

(continued)

c. 1SW"231> NNS CNMT Fan Cooler SW Supply SHUT
d. 1SW-240, NNS CNMT Fan Cooler SW Return SHUT
e. CNMT Fan Coolers:

(1) AH-37 (1A-NNS) OFF (2) AH-37 (1B"NNS) OFF (3) AH-38 (1A-NNS) OFF (4 ) AH-38 ( 1B-NNS ) OFF (5) AH-39 (1A-NNS) OFF (6) AH-39 (1B-NNS) OFF

6. Position reset switch S921 to RESET.
7. Verify the following equipment status'.

a ~ 1CS-9, Letdown Orifice C Isolation 'HUT

b. 1SI-263, Accumulator Test Return Isol SHUT C ~ 1SW-231, NNS CNMT Fan Cooler SW Supply SHUT
d. 1SW"240, NNS CNMT Fan Cooler SW Return SHUT
e. CNMT Fan Coolers:

(1) ,AH-37 (1A-NNS) OFF (2) AH-37 (1B-NNS) OFF (3) AH-38 (1A-NNS) OFF (4) AH"38 (1B-NNS) OFF (5) AH-39 (1A-NNS) OFF L

~ '~

(6) AH-39 (1B-NNS)

OST-1083 Rev. 3 Page 36 of 52

Osl 7.7 Train A Containment Isolation Phase A " Go Circuit (K622)

(continued

8. Realign the following equioment as required for plant operations:
a. 1CS-9, Letdown Orifice C Isolation Final Positior Positioner Verifier
b. 1SI-263, Accumulator Test Return Isolation Final Pos tion Positioner Ver'fier
c. 1SW-231, NNS CNMT Fan Cooler SW Supply Final Position Positioner Verifier
d. 1SW-240, NNS CNMT Fan Cooler SW Return Final Position Positioner Verifier
e. CNMT Coolers:

(1) AH"37 (lA-NNS)

Final Position Positioner Verifier (2) AH"37 (18-NNS)

Final Position Positioner Verifier (3) AH-38 (1A-NNS)

Final Position Positioner Verifier (4) 'H-38 (1B-NNS)

Final PositionE. Positioner Verifier (5) AH-39 (1A-NNS)

Final Position Positioner Verifier OST-1083 Rev. 3 Page 37 of 52

0 OS1

~

7.7 Train A Containment Isolation Phase A - Co Circuit (K622) continued)

(6) AH-39 (1B-NNS)

Final. Positior. Positioner Verifier OST-1083 Rev. 3 Page 38 of 52

OS1 7.8 Train A Loo 1 AFW Line Isolation Go Circuit (K615)

1. Prepare the valves for testing as follows:

a.. 1AF-137, AFW Pump 1X"SAB to S/G 1A-SN OPEN

b. 1AF-49, AFW Reg Valve to S/G 1A-SN OPEN
2. Unlock and Shut the. following valves to preven't cold water from being injected to the Steam Generators when Motor Driven Auxiliary Feedwater Pump is running. (NA for pump not to be run)
a. 1A MDAFW Pump (1) 1AF-36, AFWP 1A First Isol. to C S/G.

(2) 1AF-40, AFWP 1A Isolation to A S/G.

b. 1B MDAFW Pump (1) 1AF-39, AFWP 1B First Isolation to C S/G.

(2) 1AF-42, AFWP 1B Isol,ation to B S/G.

3. Start Aux Feedwater Pump 1A OR 1B (NA pump not used).
a. 1A MDAFW Pump
b. 1B MDAFW Pump
4. Establish phone communications between operators the Main Control Room and the Safeguards Test Cabinet.
5. Open the Protection System Safeguards Test Train "A" Cabinet 2 door and, with the Shift Foreman's approval, commence the slave relay test.

6 Energize slave relay K615 by turning test switch S922 clockwise and 'depressing momentarily. (Test switch will spring return to the normal left-hand position.)

OST-1083 Rev. 3 Page 39 of 52

Osl 7.8 Train A Loo 1 AFW Line Isolation - Go Circuit (K615)

(continued)

7. Verify the valves realign as follows:
a. 1AF-137, AFW Pump 1X-SAB to S/G 1A-SN SHUT
b. 1AF-49, AFW Reg Valve to S/G 1A-SN SHUT
8. Release test switch S922 (Test s~itch will spring return to the normal left"hand position).
9. Position reset switch S921 to RESET.
10. Realign the following valves as required for plant operations:
a. 'AF-137, AFW Pump 1X"SAB to S/G 1A"SN Final Position Positioner Verifier
b. 1AF-49, AFW Reg Valve to S/G 1A-SN Final Position Positioner Verifier NOTE: Mark the following steps N/A if Section 7.9 is to be performed next.

Stop the Aux Feedwater Pump started in Step 3 per OP-137. (NA pump not used) a ~ lA MDAFW Pump

b. 1B MDAFW Pump
12. Open and lock open the following valves'(NA valves not shut in Step 2)
a. 1A MDAFW Pump.

(1) 1AF-36, AFWP 1A First Isol to C S/G LOCKED OPEN VERIF OST-1083 Rev. 3 Page 40 of 52

OS1 7.8 Train A"Loo 1 AFW Line Isolation Go Circuit (K615) continued (2) 1AF-40, AFWP 1A Isolation to A S/G LOCKED OPEN VERIF

b. 1B MDAFW Pump (1) 1AF-39, AFWP 1B First Isol to C S/G LOCKED OPEN VERIF (2) 1AF-42, AFWP 1B Isolation to B S/G LOCKED OPEN VERIF 7.9 Train A Loo 2 AFW Line Isolation - Go Circuit (K616)
1. Prepare the valves for testing as follows:
a. 1AF"143, AFW Pump 1X-SAB to S/G )B-SB OPEN B. 1AF-51, AFW ReS Valve te S/G 1B-SB OPEN NOTE: Mark the following 2 steps N/A if this equipment was left in the required lineup in Section 7.8.

2~ Unlock and Shut the following valves to prevent cold water from being injected to the Steam Generators when Motor Driven Auxiliary Feedwater Pump is running. (NA for pump not to be run) a ~ 1A MDAFW Pump (1) 1AF-36, AFWP 1A First Isol. to C S/G.

(2) 1AF-40, AFWP lA Isolation to A S/G.

b. 1B MDAFW Pump (1) 1AF-39, AFA'B First Isol. to C S/G.

(2) 1AF-42, AFWP 1B Isolation to B S/G.

OST-1083 Rev. 3 Page 41 of 52

Osl 7.9 Train A Loon 2 AFW Line isolation Go Circuit (K616)

(continued

3. Start Aux Feedwater Pump lA OR 1B. (NA pump not used)
a. 1A MDAFW Pump
b. 1B MDAFW Pump
4. Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.

1 Open the Protection System Safeguards Test Train "A" Cabinet 2 door and, with the Shift Foreman's approval, commence the slave relay test.

6, Energize slave relay K616 by turning test switch S923 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)

7. Verify the valves realign as follows:
a. 1AF-143, AFW Pump 1X-SAB to S/G 1B-SN SHUT B. 1AF-51, AFW Reg Valve to S/G 1B-SN SHUT
8. Release test switch S923 (Test switch will spring return to the normal left-hand position).
9. Position reset s~itch S921 to RESET.

10 'ealign the following valves as required for plant operations:

a. 1AF-143, AFW Pump 1X-SAB to S/G 1B-SN Final Position 'ositioner E.

Verifier

b. 1AF-51, AFW Reg Valve to S/G 1B-SN Final Position Positioner Verifier OST-1083 Rev. 3 Page 42 of 52

OS1 7.9 Train A Loo 2 AFW Line Isolation - Go Circuit (616)

(continued)

NOTE: Mark the following steps N/A if Section 7,10 is'to be performed next.

Stop the Aux Feedwater Pump started in Step 3 per OP-137. (NA pump not used) a ~ 1A MDAFW Pump

b. 1B MDAFW Pump
12. Open and lock open the following valves'(NA valves not shut in Step 2 of this section or 7.8) a ~ 1A MDAFW Pump (1) 1AF-36 AFWP 1A First Isol to C S/G.

LOCKED OPEN VERIF (2) 1AF-40 AFWP 1A Isolation to A S/G.

LOCKED OPEN VERIF

b. 1B MDAFW Pump (1) 1AF-39, AFWP 1B First Isol. to C S/G LOCKED OPEN VERIF (2) 1AF-42, AFWP 1B Isolation to B S/G LOCKED OPEN VERIF 7.10 Train A Loo 3 AFW Line Isolation - Go Circuit (K617)
1. Prepare the valves Efor testing as follows'.
a. 1AF-149, AFW Pump 1X-SAB to S/G 1C-SN OPEN
b. 1AF-50, AFW Reg Valve to S/G 1C-SN OPEN OST-1083 Rev. 3 Page 43 of 52

Osl 7.10 Train A Loo 3 AFW Line Isolation - Go Circuit (K617)

(continued)

NOTE: Mark the following 2 steps N/A if this equ'pment was left in the requireo lineup 'n Sr tion 7.9

2. Unlock and Shut the following valves to prevent co'.d water from being inj cted to the Steam Generators when Motor Driven Auxiliary Feedwate" Pump is running. (NA for pump not to be run)
a. 1A MDAFW Pump (1) lAF-36, AFWP 1A First Isol. to C S/G.

(2) 1AF-40, AFWP 1A Isolation to A S/G.

b. 1B MDAFW Pump (1) 1AF-39, AFWP 1B First isoi. to C S/U ~

(2) 1AF-42, AFWP 1B Isolation to B S/G.

3. Start Aux Feedwater Pump 1A OR 1B. (NA pump not used)
a. 1A MDAFW Pump
b. 1B MDAFW Pump
4. Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.

5 ~ Open the Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's approval, commence the slave relay test.

6. Energize slave relay K617 by turning test switch S924 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)
7. Verify the valves .realign as follows'.

t

a. 1AF-149, AFW Pump 1X"SAB to S/G 1C-SN SHUT
b. 1AF-50, AFW Reg Valve to S/G 1C-SN SHUT OST-1083 Rev. 3 Page 44 of 52

Osl 7.10 Train A Loo 3 AFW Line Isolation - Go Circuit (K617) continued

8. Release test s~itch S924 (Test switch w'll spring return to the normal left-hand position).
9. Position reset switch S921 to RESET.
10. Realign the following valves as required for plant operations:
a. 1AF-149, AFW Pump 1X-SAB to S/G 1C-SN Final Position Positioner Verifier
b. 1AF-50, AFW Reg Valve to S/G 1C-SN Final Position Positioner Verifier
11. Stop the Aux Feedwater Pump started in Step 3 per OP-137. (NA pump not used)
a. 1A MDAFW Pump
b. 1B MDAFW Pump
12. Open and lock open the following valves: (NA valves not shut in Step 2 of this section or 7.8 or 7.9)
a. 1A MDAFW Pump (1) lAF-36, AFWP 1A First Isol to C S/G ~

LOCKED OPEN VERIF.

(2) 1AF"40, AFWP 1A Isolation to "B" S/G.

LOCKED OPEN VERIF.

OST-1083 Rev. 3 Page 45 of 52

Osl 7.10 Train A Loo 3 AFW Line Isolation - Go Circuit (K617)

(continued)

b. 1B MDAFW Pump (1) lAF-39, AFWP 1B First 'Isol. to C S/G.

LOCKED OPEN VERIF (2) 1AF-42, AFWP 1B Isolation to B S/G.

LOCKED OPEN VERIF 7.11 Train A SI for Switchover to Recirculation - Go Circuit (K739 K740 K741)

1. Prepare the equipment for testing as follows:
a. 1SI-300, CNMT Sump to RHR Pump A Isol SHUT
b. 1SI-310, CNMT Sump to RHR Pump A Isol SHUT C ~ 1CT-105, CNMT Sump to CS Pump A Suet SHUT
d. 1CT-26, CNMT Spray Pump A Suction SHUT
e. RWST/ Lo-Lo LVL Bistables on TSLB-4, LB990C, LB991C, LB992C, and LB993C OFF
f. CS Pump A Breaker on Emer Bus 1A2"SA Cub. 4C RACKED OUT
g. 1CT-26 Breaker at MCC 1A21-SA Compt. 10B.

OFF 2~ Have a Maintenance Electrician install a jumper across terminals 20 and 24 in MTC 8A-SA Panel 1 to simulate CS Pump breaker closure.

CAUTION The water in the CNMT Spray System is contaminated, use appropriate actions in accordance with AP-503 in handling the contaminated fluid.

3. Drain Containment Spray System A as follows:

OST-1083 Rev. 3 Page 46 of 52

Osl 7.11 Train A SI for Switchover to Recirculation - Go Circuit (K739 K740 K741) (continued) a ~ Shut or check SHUT the following valves:

(1) 1CT-50 CNMT SPRAY PUMP A-SA DISCHARGE (2) 1CT-47 CNMT SPRAY PUMP A-SA RECIRC (3) 1CT-36 CS PUMP A EDUCTOR LINE INLET ISOL (4,) 1CT-39 CS PUMP A EDUCTOR LINE OUTLET ISOL

b. Open the low point drain at CNMT Spray. Pump (RAB 190):

(1) 1CT-28 CS PUMP A SUCTION LINE DRAIN (2) 1CT-29 CS PUMP A SUCTION LINE DRAIN C ~ Open the high point vent at CNMT Penetration 23 (RAB 236):

(1) 1CT-45 SPRAY HDR A TEST CONN (2) 1CT-46 SPRAY HDR A TEST CONN Mhen piping is empty, shut the low point drain valves:

(1) 1CT-28 CS PUMP A SUCTION LINE DRAIN Verif.

(2) 1CT-29 CS PUMP A SUCTION LINE DRAIN Verif.

4. Establish communications between operators in the Main Control Room and the Safeguards Test Cabinet.
5. Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Ship Foreman's approval, 'commence the slave relay test.
6. Energize slave relay K740 by turning test switch S940 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)

OST-1083 Rev. 3 Page 47 of 52

OS1 7.11 Train A SI for Switchover to Recirculation Go Circuit (K739 K740 K741) (continued)

7. Verify Bypass Permiss ve Light Panel light 4-8 SI Actuated RHR SUCT will xfer on RWST LO-LO LEVEL illuminates.
8. Verify light on SI SUCTION AUTO SWITCH OVER RESET TRAIN A illuminates.
9. Energize slave relay K741 by turning test switcn S941 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)
10. Verify the valves realign as follows:
a. 1SI-300, CNMT Sump to RHR Pump A Isol OPEN
b. 1CT-105, CNMT Sump to CS Pump A Suet OPEN ll. Realign the valves as follows'.
a. 1SI-300, CNMT Sump to RHR Pump A Isol SHUT
b. 1CT"105, CNMT Sump to CS Pump A Suet SHUT
12. Energize slave relay K739 by turning test switch S942 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)
13. Verify the valves realign as follows.'.

1SL-310, CNMT Sump to RHR Pump A Isol OPEN

b. 1CT-105, CNMT Sump to CS Pump A Suet OPEN
14. Realign the valves as follows'.
a. 1SI"310, CNMT Supp to RHR Pump A Isol SHUT
b. 1CT-105, CNMT Sump to CS Pump A Suet SHUT
15. Position reset switch S921 to RESET.

OST-1083 Rev. 3 Page 48 of 52

Os 1 7.11 Train A SI Eor Switchover to Recirculation Go Circuit (K739 K740 K741) continued

16. Position SI SUCTION AUTO SWITCHOVER RESET TRAIN A switch to RESET.
17. VeriEy Bypass Permissive'ight Panel light 4-8 SI ACTUATED RHR SUCT WILL XFER ON RWST LO-L'0 LEVEL extinguishes. N 18e Verify light on SI SUCTION AUTO SWITCH OVER RESET TRAIN A extinguishes.
19. Have the Maintenance Electrician remove the jumper across terminals 20 and 24 in MTC 8A-SA Panel 1.

Electrician Verifier

20. Refill the Containment Spray System A piping as follows:
a. Turn on power supply MCC 1A21-SA Compt. 10B and then open 1CT"26 RWST to CNMT SPRAY PUMP A-SA.

breaker ON valve OPEN

b. When a solid water stream flows from the vent, close the following', independent verificatrion is required.

1CT-45 SPRAY HDR A TEST CONN CLOSED 1CT-46 SPRAY HDR A TEST CONN CLOSED c~ Vent the CS Pump A-SA casing. VENTED

d. Vent aEfected instrumentation:

PI-7120A CSP"SA Suction Pressure VENTED PI-7120A CSP"S'A'eduction Pressure VENTED PI-7130A CSP-SA Discharge Pressure VENTED PI-7131A CSP-SA Discharge Pressure VENTED FT-7122A CSP-SA Flow VENTED OST-1083 Rev. 3 Page 49 of 52

OS1 7.11 Train A SI for Switchover to Recirculation Go Circuit (K739 K740 K741) (continued)

21. Realign the follcwing equipment as required for plant operations:
a. 1SI-300, CNMT Sump to RHR Pump A Isol Final Position Positioner Verifier
b. 1SI-310, CNMT Sump to RHR Pump A Isol Final Position Positioner Verifier
c. 1CT-105, CNMT to CS Pump A Suet Final Position Positioner Verifier
d. 1CT-26, CNMT Spray Pump A Suction Final Position Positioner Verifier
e. CNMT Spray Pump A Breaker on Emer Bus 1A2-SA Compt. 4C Final Position Positioner Verifier
f. 1CT-36, CS Pump A Eductor Line Inlet Isol Final Position Positioner Verifier
g. 1CT-39, CS Pump A Eductor Line Outlet Isol Final Position Positioner Verifier 8.0 DIAGRAMS/ATTACHMENTS Attachment I - Calibration Data Attachment II Certifications and Reviews OST-1083 Rev. 3 Page 50 of 52

OSl ATTACHMENT I Page 1 of 1 Calibration Data INST/MODEL 0 DESCRIPTION INST I.D. CPL DUE DATE VOLTMETER STOP MATCH

  • RONAN
  • RONAN
  • RONAN
  • RONAN
  • RONAN
  • RONAN

- If required due to Drained S/G OST-1083 Rev. 3 Page 51 of 52

Osl

'TTACHMENT II CERTIFICATIONS AND REVIEWS Page'1 of 1 This OST was erformed as a.'eriodic surveillance requirement Post-Maintenance Operability Test Redundant Subsystem Test Plant Conditions.'ST Mode:

Completed by.

DATE TIME OST Performed B Initials Name (Print) Initials Name (Print)

General Comments/Recommendations/Corrective Actions:

Pages Used:

Fill out Task Sheet OSRM019 if done during refueling.

Fill out Task Sheet OSER019 if done during cold shutdown >72 hours.

OST Has Been Satisfactoril /Unsatisfactoril Com leted:

Shift Foreman Date REVIEWED BY:

Manager - Shift Operations Date OST-1083 Rev. 3 Page 52 of 52