Change 2,Rev 2 to Vol 4,Part 7 of Plant Operating Manual Procedure MST-I0080, RCS Wide Range Pressure P-0402, Reflecting Case Level Change to Case III
ML18010A836
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/28/1992
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML18010A832 List:
References
MST-I0080-P07, MST-I80-P7, NUDOCS 9210280089
Download: ML18010A836 (8)


Text

ENCLOSURE 4 PLANNED SURVEILLANCE TESTING AND CALIBRATION PROCESS FOR LOGIC MODIFICATION 9210280o "05000400 089 921009 PDR ADQCH,'P

Procedures and Planned Testin of Alternate Miniflow S stem

1) MST-I-0080 MST-I-0081 MST-I-0080 and 81 are the maintenance surveillance tests that perform the loop calibration and functional checkout of the RCS Wide Range Pressure Channels P-402 and P-403.

The approved version and the review copy of MST-I-0080 is supplied.

MST-I-0081 is the same as MST-I-0080, but for the B Train.

2) OST-1083 OST-1084 OST-1083 and 1084 are the Operations Surveillance Tests that tests the slave relays in the ESFAS System.

These tests willbe revised to test the new relay configuration.

3) OST-1825 OST-1826 OST-1825 and 1826 are the Operations Surveillance Tests that test the responses of components that receive a safety injection signal.

This test will be modified to test the Alternate MiniflowMOV's in their new logic arrangement.

We are reviewing this procedure to see ifrecording the flow rate through the strainer and alternate miniflow orifice can be added to this procedure.

Due to the fact that this procedure is so complex we may incorporate this testing into another OST that can accommodate this testing without greatly changing the scope of the procedure.

If this cannot be done, then a separate OST will be written to test the flow of the Alternate Miniflow System.

This flow will be trended and strainer inspections done as needed.

Also, a set inspection frequency will be developed and subsequently ad)usted as indicated by trending and inspections.
4) Post Modification Testin Post Modification Tests will be written to demonstrate that the logic changes will control the MOV's as the modification intends and that the MOV's will operate in both the open and the shut direction against flow pump differential pressure.

Also flow through the alternate miniflow orifice will be documented.

This procedure will have a section for documenting any abnormal piping movement as witnessed by an engineer from the Harris Nuclear Engineering Department.

~

e

tr e'DVANCE CHANCE FORA

( l )

Vol. ~

Part (Z)

Procedvze Title Procedure No.

ger..

Change 0

(3) eason ror tne nange Qb 5c Leuc (4) esc. xptaon oz tne ange (s)

(6) umoer oz roceaure ages Attacne Verify that the Technical Specifications rocedure Cros Reference, FSAR Commitment Cross Reference and ANSI 'c..i Comr;.itment Cross Refe.ence (AP-005) have been reviewed and all discreoancies found have been submitted to Regulatory Compliance for resolution.

n a

Date arne ~

xgnature If a revision is requiredg'to the Technical Specification Procedure Cross Reference, verify that a Task Change Request Form (PLP-103) has been submitted for Hanagement Approval.

Date egu atory ompLxance a

(7)

Submitted for Approval:

ote.

A xt. not app xcaD e

rxgxsator s

arne ann signature

. 0 /"

(8)

TechnicaL Reviews.

1st Qualified Technical Reviewer Date ~23 I' Sxgnatur'e' am ana uate

'9-2V+2.

~te ra requi. ed E;)S-7 ~

2nd Qual.ified Technical Reviewer arne an CP6L Safetv Review:

(Chpc'.k Agtol xgnature

""'ttached not (9) ate Date uaLxzxe azety evxewer s

arne ana Signature (10) Required Reviewers.'Circle ail applicable)

AA, CH, DS, E EP, F

, Il, HCg MNg NFg OMg OPg OS g PPg QAg RGg RMg SGg Tg TS alp nest -

equare eve.ewez arne an signature

~ar. e

~le nest.-

equxre eve.ewer arne an Signature Originator's Supervisor (11) Approved By.'rne ixtie amain Sxgnaturgppp xgnaturc

-2.

AVE.

P-8 4 SS2

~/Wl~a ate Remarks:

&<0 IU'~ '. +k (Form AP-007-4-9)

SEP 0.2 1992 f%P DOCUMENT CONTAOL HNP COYiTROLLED COPY 0

~

~

3) eason zoz t e ange <~

Ct rr~

4r'p (4) escrxptxon or t e ange ADVANCE CHANCE FORM (1)

Vo(. ~

Parr.

7 Proc.

No.

ST +r)08 0'Rev.

2-CDaoga P

I (2)

Proceauze Title c

P-I fr Ye

-0 o2

(

C (5)

Nueber of Procedure pages Attac)sed Date F28 Pl am an xgnature Zf a revision is required'to the Technical Specification Pzocedure Cross Reference, verify that a Task Change Request Fozm (PLP-103) has been submitted for Management Approval..

Date ote.

reparer may x

not applicable egu atory omp nance (6)

Verify that the Technical. Specifications Procedure Cross Reference, FSAR Comnitment Cross Reference and ANSI 18.7 Commitment Cross Reference (AP-005) have been reviewed and al.l discrepancies found have been reso1ved.

(7)

Submitted for Approval:

rxgxnato s

arne Date ~->>-~~

8)

CPK Safetv Review is.'4'i p f.l g 0 o P.g f)gmred and attache not requ'red Date

'( Hlcl roce ure oordxnator arne an signature (9)

Recommended for Approval:

Qualified Technical Reviewer Qual.ified Technical Reviewer r

Quality Assurance Originator's Supervisor arne a

1gnature a /7 vTw arne an xanature arne an xg ture

~ate n1t (10) Final Approval - Approved By.

arne an xgnature

~ate FEC'PV

'PPA 2 5 l99f R'emazks.'

V'gnatuze (Form AP-007-4-8)

HRP Cog;80) 0 fRq APR 25

)991 HNP DOCUMENTCOmROL

~

~