| issue date = 06/19/2017
| issue date = 06/19/2017
| title = Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment Plans (05000483/2017008) and Request for
| title = Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment Plans (05000483/2017008) and Request for
| author name = Alexander R D, Dixon J L
| author name = Alexander R, Dixon J
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| addressee name = Diya F
| addressee name = Diya F
Line 9: Line 9:
| docket = 05000483
| docket = 05000483
| license number = NPF-030
| license number = NPF-030
| contact person = Dixon J L
| contact person = Dixon J
| case reference number = TI-2515/191
| case reference number = TI-2515/191
| document report number = IR 2017008
| document report number = IR 2017008
Line 15: Line 15:
| page count = 7
| page count = 7
}}
}}
See also: [[followed by::IR 05000483/2017008]]
See also: [[see also::IR 05000483/2017008]]


=Text=
=Text=

Revision as of 11:22, 19 June 2019

Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment Plans (05000483/2017008) and Request for
ML17170A091
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/19/2017
From: Ryan Alexander, John Dixon
NRC/RGN-IV/DRP/RPB-B
To: Diya F
Ameren Corp
Dixon J
References
TI-2515/191 IR 2017008
Download: ML17170A091 (7)


See also: IR 05000483/2017008

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX

76011-4511 June 19, 201 7 Mr. Fadi Diya, Senior Vice President

and Chief Nuclear Officer

Ameren Missouri

Callaway Plant

P.O. Box 620 Fulton, MO 65251

SUBJECT: CALLAWAY PLANT - NOTIFICATION OF NRC INSPECTION OF THE IMPLEMENTATION OF MITIGATION STRATEGIES AND SPENT FUEL POOL

INSTRUMENTATION ORDERS AND EMERGENCY PREPAREDNESS

COMMUNICATION/

STAFFING/MULTI

-UNIT DOSE ASSESSMENT PLANS

(05000483/2017008) AND REQUEST FOR INFORMATION

Dear Mr. Diya: The purpose of this letter is to notify you that

the U.S. Nuclear Regulatory Commission (NRC) staff will conduct a mitigation strategies for beyond

-design-basis external events, spent fuel pool instrumentation, and emergency preparedness enhancements inspection at the

Callaway Plant

from August 28 - September 1, 2017. The inspection will consist of three reactor inspectors from the NRC

's Region IV office, plus one of the assigned Resident Inspectors at the Callaway Plant for one week. The inspection will be conducted in accordance with

the NRC's Temporary Instruction 2515/191 , "Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders, and Emergency Preparedness Communication/Staffing/Multi

-Unit Dose Assessment Plans."

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and licensee staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection

activity. Please note that the documents

are requested to be provided by

August 11, 2017

. During the onsite inspection, inspectors will verify that plans for complying with NRC Orders

EA-12-049 and EA

-12-051 are in place and are being implemented. Inspectors will also verify the establishment of staffing and communications plans provided in response to the March 12, 2012, request for information letter, and multi-unit dose assessment information provided per COMSECY-13-0010, Schedule and Plans for Tier 2 Order on Emergency Preparedness for Japan Lessons Learned, dated March 27, 2013. These plans and information were provided in the site specific submittals, which were subsequently reviewed by the NRC staff for

understanding and documented in the NRC's plant safety evaluations (SEs) and safety

assessments. Therefore, appropriate personnel knowledgeable of

the station's FLEX

strategies, spent fuel pool instrumentation, and emergency preparedness enhancements

should be available to support the inspector s at the site during the inspection.

F. Diya 2 We have discussed the schedule for th

is inspection activit

y with your staff and understand that our regulatory contact for this inspection will be

Elizabeth Ptasznik

of your licensing organization. If there are any questions about this inspection or the material requested, please contact the l ead inspector , Ryan D. Alexander

, by telephone

at 817-200-1195 or by e-mail at ryan.alexander@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC

's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html

(the Public Electronic Reading Room).

Sincerely, /RA/ John L. Dixon , Acting Chief Project Branch B

Division of Reactor Projects

Docket No. 50

-483 License No. NPF

-30

Enclosure: FLEX Strategies, Spent Fuel Pool

Instrumentation

, & EP Enhancements

Inspection

Request for Information

1 Enclosure Request for Information

FLEX Strategies, Spent Fuel Pool Instrumentation, & EP Enhancements

Inspection

Callaway Plant

Inspection Report:

050004 83/2017 008 Inspection Dates:

August 28

- September 1

, 2017

Inspection Procedure:

Temporary Instruction 2515/191 , "Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders, and Emergency Preparedness Communication/Staffing/Multi

-Unit Dose Assessment Plans"

Inspect o r s: Ryan D. Alexander

, Team Lead, Sr.

Project Engineer, Region IV

Dan Bradley , Callaway Plant

Senior Resident Inspector

Steve Alferink, Reactor Inspector, Region IV

Michael Stafford, Project Engineer, Region IV

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic format (use of the Certrec IMS

information portal is preferred), to the attention

of Ryan Alexander , by August 11, 2017. The inspector s will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week. Also, we request that you categorize the documents in your response with the numbered list below.

Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the

lead inspector, and provide

subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the lead

inspector as soon as possible.

TI 2515/191

- Appendix A

A. Provide current revision of the FLEX Final Integrated Plan

(i.e., current FLEX Program Document), including any revisions since July 2016 submission to the NRC

. B. Provide the FLEX Strategy Basis Document.

C. Provide each operating, off

-normal, abnormal, and/or emergency procedures where entry into one or more

FLEX Support Guideline(s) are initiated

. D. Provide a list

and copies of every FLEX Support Guideline (FSG) or equivalent procedure which you developed or revised to implement your mitigating strategies.

E. Provide a list of key piece

s of equipment that directly perform a FLEX mitigation strategy for core cooling (RCS and Steam Generators), containment, and/or spent fuel pool

cooling. F. Provide a listing/summaries

of plant modifications completed related to the FLEX program.

G. Provide a listing of calculations, evaluations, and 50.59 reviews related to the FLEX program

and modifications

.

2 H. Applicable site specific hazards for the Callaway Plant

1) Provide documents which show the locations and configuration of structure(s) which store FLEX equipment

. 2) Seismic (a) Provide the travel route(s) for FLEX equipment from storage location(s) to their location(s) of use, AND evaluation(s) which demonstrate that for the potential for soil liquefaction is not of a concern for these travel route(s).

(b) Seismic concerns for water source(s)

(1) If the FLEX water sources are seismically robust, then provide the assessment that shows that they are.

(2) If the FLEX water sources are not seismically robust, then provide:

(a) an assessment of alternate water sources, and

(b) the procedure(s) which describe when and how to access those sources.

3) External Flooding {"Screened Out

" for Callaway Plant

- no documents requested}

4) Severe storms with high winds

(a) Provide evaluation/evidence as to how FLEX equipment is stored relative to protection from severe storms with high winds:

(1) In a structure that meets the plant's design basis for high wind hazards (e.g., existing safety

-related structure); OR

(2) In a structure that meets the design requirements as described in ASCE 7-10, "Minimum Design Loads for Buildings and Other Structures," given the limiting tornado wind speeds

from Regulatory Guide 1.76, and/or design

-basis hurricane wind speeds.

(b) Provide pathways via which you plan to move FLEX equipment from onsite storage areas to final deployment locations.

(1) Show how you designated and evaluated those pathways for post

-storm accessibility for staging and connecting FLEX equipment.

5) Snow, Ice, and Extreme Cold

For each key piece of equipment described in Item 5

(above) that directly performs or implements a FLEX mitigation strategy:

(a) Provide procedures/documents

demonstrating that the FLEX equipment is maintained at a temperature within a range to ensure that it will function when called

upon. (b) Provide procedures/documents

demonstrating how the FLEX equipment can be moved from the storage location to its deployment location during extreme snowfall and ice storms.

3 6) Extreme high temperatures

For each key piece of equipment described in Item

5 (above) that directly performs or implements a FLEX mitigation strategy

(a) Provide procedures/documents

which describes the high

-temperature limit of the range within which the equipment will function.

(b) Provide procedures/documents

which describe how the equipment is maintained below that limit in its storage location.

I. Provide the station

-specific FLEX strategies time validation study(ies)

. J. Provide the relevant station procedure(s)/guideline(s) which describe

the testing and maintenance program for FLEX equipment.

As applicable, provide a listing of the model work orders established to conduct period testing and maintenance activities for FLEX equipment. [A sample of records for completed maintenance/testing activities

may be requested for review

during the onsite inspection week.]

K. Provide documents/procedures

which describe the programmatic controls in place

to ensure that if equipment and applicable connections are unavailable (e.g., due to maintenance , non-functionality), then compensatory measures are implemented in accordance with guidance outlined NEI 12

-06. L. Provide the station

-specific National SAFER Center "Playbook"

M. Relative to personnel training on FLEX strategies, provide:

1) FLEX training bases document(s)

2) Lesson plans/training documents

for site emergency response leaders responsible for the implementation of FLEX strategies. [Records for staff completing this training may be requested for review

during the onsite inspection week.]

3) Lesson plans/training documents

for site personnel responsible for the execution of mitigating strategies for BDBEEs (i.e., operators, craft personnel, security, radiation protection, etc.). [Records for staff completing this training may be requested for review

during the onsite inspection week.]

N. A current copy of administrative procedure(s) for the CAP, modification program, operations

procedure writing and implementation, and top-level documents for the work control and work scheduling programs.

(If FLEX related procedures such as FSGs or the FIP are maintained under a different process

, please include copies of those

procedures.

) O. A current copy of the U/FSAR, Technical Specifications, and Technical Specification Bases documents.

P. Listing of corrective action program document summaries generated related to FLEX equipment, strategies, procedures, and/or training.

Q. A copy of any audits/self

-assessments related to your preparation for this inspection, as well as any related to the implementation or maintenance of the FLEX program.

TI 2515/191

- Appendix B

R. Provide the procedures implemented for maintenance, testing, calibration, and use of the primary and backup Spent Fuel Pool (SFP) instrumentation channels.

S. Provide lesson plans/training documents which describe the training program that address the use, maintenance, calibration, surveillance, and the use of alternate power to the primary and backup SFP instrument channels.

4 TI 2515/191

- Appendix C

T. Communications:

1) Provide documents which show that

the communications system(s), technologies, equipment and power supplies would be available from the beginning of the event and operate during an ELAP.

2) Provide the procedures and/or guidance used to implement the communication capabilities

. 3) Provide documents which show that you have added any new communications equipment, portable power supplies and/or systems have been added to ongoing testing and preventative maintenance programs.

U. Staffing: 1) Provide documents which show that onsite and augmented staff will be available to

implement the strategies

in response to a large scale natural event that results an ELAP and impedes access to the site, and that functions/tasks have been appropriately

staffed. 2) Provide documents which show that the site access methods (e.g., roadways, navigable bodies of water and dockage, airlift, etc.) expected to be available

following the event and available to the Emergency Response Organization (ERO) [as described in the Phase 1 and 2 staffing assessments and NRC safety assessment]. 3) Provide documents which show the testing, training, and drills/exercises performed by

the station

to demonstrate the ERO's ability to utilize the communications systems and/or equipment.

V. Provide documents and procedures which show that your dose

assessment is capable of analyzing concurrent radiological releases from all on-site significant sources, including releases from spent fuel pools (i.e., multi

-unit/multi

-source dose assessment capability)

. Lead Inspector Contact Information:

Ryan D. Alexander , Sr. Project Engineer

Mailing Address

817-200-11 95 U.S. NRC, Region IV

Ryan.Alexander@nrc.gov

Attn: Ryan Alexander, DRP

1600 East Lamar Blvd.

Arlington, TX 76011

-4511

ML17170A091

SUNSI Review By: RDA/rdr ADAMS: Yes No Sensitive

Non-Sensitive Non-Publicly Available

Publicly Available

Keyword NRC-002 OFFICE DRP/RPBA C:DRP/RPBB

NAME RAlexander

JDixon SIGNATURE /RA/-E /RA/ DATE 06/14/2017

06/19/2017