IR 05000280/2018003: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 10/26/2018 | | issue date = 10/26/2018 | ||
| title = Nuclear Regulatory Commission Integrated Inspection Report 05000280/2018003 and 05000281/2018003 | | title = Nuclear Regulatory Commission Integrated Inspection Report 05000280/2018003 and 05000281/2018003 | ||
| author name = Hardage D | | author name = Hardage D | ||
| author affiliation = NRC/RGN-II/DRP/RPB4 | | author affiliation = NRC/RGN-II/DRP/RPB4 | ||
| addressee name = Stoddard D | | addressee name = Stoddard D | ||
Revision as of 19:26, 12 June 2019
| ML18306A957 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 10/26/2018 |
| From: | David Hardage NRC/RGN-II/DRP/RPB4 |
| To: | Stoddard D Virginia Electric & Power Co (VEPCO) |
| References | |
| IR 2018003 | |
| Download: ML18306A957 (18) | |
Text
/RA/