ML17124A528: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(10 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17124A528
| number = ML17124A528
| issue date = 04/15/2017
| issue date = 04/15/2017
| title = McGuire Nuclear Station, EPIP Manual, Revision 16
| title = EPIP Manual, Revision 16
| author name =  
| author name =  
| author affiliation = Duke Energy Corp
| author affiliation = Duke Energy Corp
Line 16: Line 16:
=Text=
=Text=
{{#Wiki_filter:Distribution:
{{#Wiki_filter:Distribution:
Duke Energy Date: 4l15l2Q17 Document Transmittal  
Duke Energy Date: 4l15l2Q17 Document Transmittal #: TR-NUC-MC-005809
#: TR-NUC-MC-005809  
: 1. MCG OPS SfAFF MGR DOCUMENTTRANSMITTALFORM
: 1. MCG OPS SfAFF MGR DOCUMENTTRANSMITTALFORM  
 
: 2. MCG PLANT ENG. LJBR. 3. MCG RAD PROT Released By: 4. NUCLEAR FAOLITY PLANNER, NC Facility:
==Purpose:==
MCGUIRE NUCLEAR STATION D!.!k!il Energv 5. OPS TRNG MGR. SUBJECT 13225 E!i!CCV ROi!d 6. RESIDENT NRC INSPECT Issue MNS EPIP Manual Document Management  
~
: 7. US NRC DOC CNTL WASHNGTON DC ./ MG02DM Huntersville, NC 28078 Page 1of1 MNSDCRM@duke-energx.com  
: 2.
' ; ,, ' *.***.* .** Doci.urient ID .*. . ...... ,c ' <* ** ... **.* ;, {: '.* 1 2 3 ',* '' '** 4 5 6 7 APMN*"  
MCG PLANT ENG. LJBR.
'''.* , ;::::, R&AIE FYIIE R&AIE R&AIE R&AIE PRINTILP R&AIE Remarks:
: 3.
Index, SRLOLAL2QQOLQ03 PROCEDURE#
MCG RAD PROT Released By:
RP/O/ A/5700/000 RP/O/A/5700/001 RP/O/ A/5700/002 RP/O/ A/5700/003 RP/O/ A/5700/004 RP/O/ A/5700/006 RP/O/ A/5700/007 RP/O/ A/5700/008 RP/O/ A/5700/009 RP/O/A/5700/010 RP/O/A/5700/011 RP/O/A/5700/012 RP/O/ A/57001018 RP/O/A/5700/019 RP/O/ A/5700/020 RP/O/ A/5700/022 RP/O/ A/5700/024 RP/O/ A/5700/026 RP/O/B/5700/023 RP/O/B/5700/029 HP/O/B/1009/002 HP/O/B/10091003 HP/O/B/1009/006 HP/O/B/1009/010 HP/O/B/1009/021 HP/O/B/1009/022 EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX Classification of Emergency Notification of Unusual Event Alert Site Area Emergency General Emergency Natural Disasters Earthquake Release of Toxic or Flammable Gases Collisions/Explosions NRC Immediate Notification Requirements Conducting a Site Assembly, Site Evacuation or Containment Evacuation Activation of the Technical Support Center (TSC) Notification to the State and Counties from the TSC Core Damage Assessment Activation of the Operations Support Center (OSC) Spill Response Procedure Recovery and Reentry Procedure Operations/Engineering Required Actions in the Technical Support Center (TSC) Nuclear Communications (NC) Emergency Response Plan Notifications to Offsite Agencies From The Control Room Alternative Method for Determining Dose Rate Within the Reactor Building Recovery Plan Procedure for Quantifying High Level Radioactivity Releases During Accident Conditions Releases of Radioactive Effluents Exceeding Selected Licensee Commitments Estimating Food Chain Doses Under Post-Accident Conditions Accident and Emergency Response REVISION NUMBER Rev.027 Rev.034 Rev.035 Rev.035 Rev. 033 Rev.032 Rev.027 Rev.007 Rev. 004 Rev. 031 Rev.020 Rev.048 Rev.030 Rev.007 Rev. 032 Rev.016 Rev.002 Rev.017 Rev.005 Rev. 021 Rev. 002 Rev. 004 Rev. 006 Rev. 007 Rev.001 Rev. 005 March 22, 2017 Rev. 170 PROCEDURE#
: 4.
HPIO/Bll 0091023 HPIO/Bll 0091024 HPIO/Bll 0091029 SHIOIBl20051001 SHIOIBl20051002 SHIOIBl20051003 SR/01A/20001001 SR/OIBl20001001 SRIOIBl20001002 SR/01 A/20001003 SRIOIBl20001003 SR/01 A/20001004 SR/OIBl20001004 EP Group Manual PT IOI A/46001088 APIOI A/5500104 7 AD-EP-ALL-0202 AD-EP-ALL-0203 AD-EP-ALL-0204 EMERGENCY PLAN Th1PLEMENTING PROCEDURES INDEX TITLE REVISION NUMBER Environmental Monitoring for Emergency Conditions Rev.008 Personnel Monitoring for Emergency Conditions Rev.004 Superseded by AD-EP-ALL-0202 Superseded by AD-EP-ALL-0202 Superseded by AD-EP-ALL-0203 Superseded by AD-EP-ALL-0204 Standard Procedure for Corporate Communications Rev.2 Response to the Emergency Operations Facility Superseded by SR/01A/20001001 Rev. 13 Deleted Activation of the Emergency Operations Facility Rev. 012 Superseded Notification to States and Counties from the Emergency Rev. 007 Operations Facility Superseded Section 1.1 Emergency Organization Rev.26 Functional Check of Emergency Vehicle and Equipment Rev. 009 Security Events Rev.016 Emergency Response Offsite Dose Assessment Rev.003 Protocol for the Field Monitoring Coordinator during Emergency Conditions Distribution of Potassium Iodine Tablets in the Event of a Radioiodine Release 2 Rev. O Rev. 0 March 22, 2017 Rev. 170 Duke Energy Company Procedure No. NUCLEAR FLEET SR/O/ A/2000/003 Activation of the Emergency Operations Facility Revision No. 012 Ref etence IJ se .. PERFORMANCE I This Procedure was printed on 3/l 6/20179:15 AM from the electronic library as: (ISSUED)  
NUCLEAR FAOLITY PLANNER, NC Facility: MCGUIRE NUCLEAR STATION D!.!k!il Energv
-PDF Format Compare with Control Copy eve!)' 14 calendar days while work is being pcrfhrmed.
: 5. OPS TRNG MGR.
Compared with Control Copy * ---Date *-* . Compared with Control Copy
SUBJECT 13225 !::li!9!:~ E!i!CCV ROi!d
: 6. RESIDENT NRC INSPECT Issue MNS EPIP Manual Document Management
: 7.
US NRC DOC CNTL WASHNGTON DC./
MG02DM Huntersville, NC 28078 Page 1of1 MNSDCRM@duke-energx.com  
*.***.*.** Doci.urient ID.*........,c ' <* **... **.* ;,
{:  
'.* 1 2
3 4
5 6
7 APMN*" JV1c:.t;jt~EPiP~Mariua,12oiG=!ssui:o''.''*. '''.*, ;::::, R&AIE FYIIE R&AIE R&AIE R&AIE PRINTILP R&AIE Remarks: R!;lmoveLRe~li!ce; Index, SRLOLAL2QQOLQ03  
 
PROCEDURE#
RP/O/ A/5700/000 RP/O/A/5700/001 RP/O/ A/5700/002 RP/O/ A/5700/003 RP/O/ A/5700/004 RP/O/ A/5700/006 RP/O/ A/5700/007 RP/O/ A/5700/008 RP/O/ A/5700/009 RP/O/A/5700/010 RP/O/A/5700/011 RP/O/A/5700/012 RP/O/ A/57001018 RP/O/A/5700/019 RP/O/ A/5700/020 RP/O/ A/5700/022 RP/O/ A/5700/024 RP/O/ A/5700/026 RP/O/B/5700/023 RP/O/B/5700/029 HP/O/B/1009/002 HP/O/B/10091003 HP/O/B/1009/006 HP/O/B/1009/010 HP/O/B/1009/021 HP/O/B/1009/022 EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX Classification of Emergency Notification of Unusual Event Alert Site Area Emergency General Emergency Natural Disasters Earthquake Release of Toxic or Flammable Gases Collisions/Explosions NRC Immediate Notification Requirements Conducting a Site Assembly, Site Evacuation or Containment Evacuation Activation of the Technical Support Center (TSC)
Notification to the State and Counties from the TSC Core Damage Assessment Activation of the Operations Support Center (OSC)
Spill Response Procedure Recovery and Reentry Procedure Operations/Engineering Required Actions in the Technical Support Center (TSC)
Nuclear Communications (NC) Emergency Response Plan Notifications to Offsite Agencies From The Control Room Alternative Method for Determining Dose Rate Within the Reactor Building Recovery Plan Procedure for Quantifying High Level Radioactivity Releases During Accident Conditions Releases of Radioactive Effluents Exceeding Selected Licensee Commitments Estimating Food Chain Doses Under Post-Accident Conditions Accident and Emergency Response REVISION NUMBER Rev.027 Rev.034 Rev.035 Rev.035 Rev. 033 Rev.032 Rev.027 Rev.007 Rev. 004 Rev. 031 Rev.020 Rev.048 Rev.030 Rev.007 Rev. 032 Rev.016 Rev.002 Rev.017 Rev.005 Rev. 021 Rev. 002 Rev. 004 Rev. 006 Rev. 007 Rev.001 Rev. 005 March 22, 2017 Rev. 170  
 
PROCEDURE#
HPIO/Bll 0091023 HPIO/Bll 0091024 HPIO/Bll 0091029 SHIOIBl20051001 SHIOIBl20051002 SHIOIBl20051003 SR/01A/20001001 SR/OIBl20001001 SRIOIBl20001002 SR/01 A/20001003 SRIOIBl20001003 SR/01 A/20001004 SR/OIBl20001004 EP Group Manual PT IOI A/46001088 APIOI A/5500104 7 AD-EP-ALL-0202 AD-EP-ALL-0203 AD-EP-ALL-0204 EMERGENCY PLAN Th1PLEMENTING PROCEDURES INDEX TITLE REVISION NUMBER Environmental Monitoring for Emergency Conditions Rev.008 Personnel Monitoring for Emergency Conditions Rev.004 Superseded by AD-EP-ALL-0202 Superseded by AD-EP-ALL-0202 Superseded by AD-EP-ALL-0203 Superseded by AD-EP-ALL-0204 Standard Procedure for Corporate Communications Rev.2 Response to the Emergency Operations Facility Superseded by SR/01A/20001001 Rev. 13 Deleted Activation of the Emergency Operations Facility Rev. 012 Superseded Notification to States and Counties from the Emergency Rev. 007 Operations Facility Superseded Section 1.1 Emergency Organization Rev.26 Functional Check of Emergency Vehicle and Equipment Rev. 009 Security Events Rev.016 Emergency Response Offsite Dose Assessment Rev.003 Protocol for the Field Monitoring Coordinator during Emergency Conditions Distribution of Potassium Iodine Tablets in the Event of a Radioiodine Release 2
Rev. O Rev. 0 March 22, 2017 Rev. 170  
 
Duke Energy Company Procedure No.
NUCLEAR FLEET SR/O/ A/2000/003 Activation of the Emergency Operations Facility Revision No.
012 Ref etence IJ se PERFORMANCE I
This Procedure was printed on 3/l 6/20179:15 AM from the electronic library as:
(ISSUED) - PDF Format Compare with Control Copy eve!)' 14 calendar days while work is being pcrfhrmed.
Compared with Control Copy *  
---Date *-*.
Compared with Control Copy
* Date Compared with Control Copy
* Date Compared with Control Copy
* Dale
* Dale
* PriJlfed Name and Signature Date( s) Performed J Work Order/Task Number (WO#) COMPLETION I D Yes D NA Checklists and or blanks initialed, signed, dated, or filled in NA. as appropriate?
* PriJlfed Name and Signature Date( s) Performed J Work Order/Task Number (WO#)
COMPLETION I
D Yes D NA Checklists and or blanks initialed, signed, dated, or filled in NA. as appropriate?
D Yes D NA Required attachments included?
D Yes D NA Required attachments included?
D Yes D NA Charts, graphs, data sheets. etc. allachcd, dated, identified, and marked? D Yes D NA Calibrated Test Equipment, if used, checked out/in and referenced to this procedure?
D Yes D NA Charts, graphs, data sheets. etc. allachcd, dated, identified, and marked?
D Yes D NA Procedure requirements met? Verified By Date
D Yes D NA Calibrated Test Equipment, if used, checked out/in and referenced to this procedure?
D Yes D NA Procedure requirements met?
Verified By Date
* Printed Name a11d SiE;nature Procedure Completion Approved Date
* Printed Name a11d SiE;nature Procedure Completion Approved Date
* Pri11ted Name and Signature Remarks (a/fach additional pages, if necesswy)
* Pri11ted Name and Signature Remarks (a/fach additional pages, if necesswy)
IMPORTANT:
IMPORTANT: Do NOT mark on barcodes.
Do NOT mark on barcodes.
Printed Date:  
Printed Date: *3/16/t 7* Atlachment Number.*  
*3/16/t 7*
*FULL* I llllll llll I II 1111111111111111111111111111111 111111111111111111111111111111 Revision No,;
Atlachment Number.* *FULL*
1111111111111111111111111 Procedure No.: *sR/O/N2000/003' 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111
I llllll llll I II 1111111111111111111111111111111 111111111111111111111111111111 Revision No,;  
-Duke Energy Procedure No. Standard Procedure for CNS, 1v1NS & ONS SR/0/ A/2000/003 Revision No. Activation of the Emergency Operations Jf.acility 012 Ref ere nee Use Electronic Reference No. SHR0005P SRJO/ A/2000/003 Page 2of8 Activation of the Emergency Operations Facility I. PURPOSE 1.1 This procedure describes the emergency responsibilities and duties of the Emergency Operations Facility Emergency Response Organization (ERO) members.  
~012*
1111111111111111111111111 Procedure No.:  
*sR/O/N2000/003' 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111  
 
Duke Energy Procedure No.
Standard Procedure for CNS, 1v1NS & ONS SR/0/ A/2000/003 Revision No.
Activation of the Emergency Operations Jf.acility 012 Ref ere nee Use Electronic Reference No.
SHR0005P  
 
SRJO/ A/2000/003 Page 2of8 Activation of the Emergency Operations Facility I. PURPOSE 1.1 This procedure describes the emergency responsibilities and duties of the Emergency Operations Facility Emergency Response Organization (ERO) members.
: 2. DEFINITIONS  
: 2. DEFINITIONS  
'*****"**  
'*****"**.. *************************************""***************************************----~-*~***~-~------*-~**.. n**-----*--*---****-**--*****y****** *** _,,,,,... --*****y**-~*********
..  
NOTE:
.. n**-----*--*---****-**--*****y******  
2.1 2.2 NOTE:
*** _,,,,, ...
I..,
NOTE: 2.1 2.2 NOTE: I.., -*" The EOF must be operational using 75 minutes as a goal for the minimum staff to be in place following declaration of an Alert or higher classification.
The EOF must be operational using 75 minutes as a goal for the minimum staff to be in place following declaration of an Alert or higher classification. Turnover should occur with the TSC at a time that will not decrease the effectiveness of communications with the offsite agencies.
Turnover should occur with the TSC at a time that will not decrease the effectiveness of communications with the offsite agencies.
Operational: The Emergency Response Facility (e.g., Technical Support Center, Operations Support Center, Emergency Operations Facility) is staffed, ready to receive turnover and ready to perform assigned emergency response functions.
Operational:
Activated: The Emergency Response Facility (e.g.. Technical Support Center. Operations Support Center. Emergency Operations Facility) has accepted turnover and has direction and control of assigned emergency. response functions.
The Emergency Response Facility (e.g., Technical Support Center, Operations Support Center, Emergency Operations Facility) is staffed, ready to receive turnover and ready to perform assigned emergency response functions.
The following definition is applicable to the Emergency Notification Form Line5.
Activated:
Emergency Release: An unplanned, quantifiable radiological release to the environment caused by a declared emergency. (AD-EP-ALL-0002}
The Emergency Response Facility (e.g .. Technical Support Center. Operations Support Center. Emergency Operations Facility) has accepted turnover and has direction and control of assigned emergency.
: 3. PROCEDURE NOTES:
response functions.
o This procedure and the position specific enclosures are not intended to be followed in a serial step-by-step sequence.
The following definition is applicable to the Emergency Notification Form Line5. Emergency Release:
An unplanned, quantifiable radiological release to the environment caused by a declared emergency.  
(AD-EP-ALL-0002}  
: 3. PROCEDURE NOTES: o This procedure and the position specific enclosures are not intended to be followed in a serial step-by-step sequence.
o Instructions and guidance steps are to be implemented as applicable for the specific needs of the event.
o Instructions and guidance steps are to be implemented as applicable for the specific needs of the event.
* Use hard copy (paper) forms or electronic equivalents to complete all fonns. ****** 1
Use hard copy (paper) forms or electronic equivalents to complete all fonns.  
* References to "Status Boards" may refer to physical displays mounted in the facility or electronic displays either displayed on large monitors or on personal computer monitors.
****** 1 References to "Status Boards" may refer to physical displays mounted in the facility or electronic displays either projected~ displayed on large monitors or on personal computer monitors.
3.1 General instructions for all ERO members.
3.1 General instructions for all ERO members.
: 3. I. I Ensure appropriate checklist, logs and forms are completed.
: 3. I. I Ensure appropriate checklist, logs and forms are completed.
SR/0/ A/2000/003 Page 3of8 3.1.2 Provide critical information to appropriate personnel upon receipt rather than waiting for a time out or roundtable discussion.
SR/0/ A/2000/003 Page 3of8 3.1.2 Provide critical information to appropriate personnel upon receipt rather than waiting for a time out or roundtable discussion.
3.1.3 Use 11Attentio11 in the EOF" to announce critical information in the facility.
3.1.3 Use 11Attentio11 in the EOF" to announce critical information in the facility.  
**-**-------------------------------~
NOTE {IER Ll-13-10}:
NOTE {IER Ll-13-10}:
o The Emergency Response Organization strncture is scalable and flexible, based on the size, complexity, and the specifics of the hazard environment created by the emergency event Additional functional elements (e.g., ERO positions) can be established to enhance the management and coordination of the event. o When the emergency event's complexity increases, then the ERO can expand, as additional functional responsibilities are needed. o When the complexity decreases.
o The Emergency Response Organization strncture is scalable and flexible, based on the size, complexity, and the specifics of the hazard environment created by the emergency event Additional functional elements (e.g., ERO positions) can be established to enhance the management and coordination of the event.
then the ERO can contract, when those additional functional responsibilities are no longer needed. o The makeup and structure of the EOF will be determined by the EOF Director.
o When the emergency event's complexity increases, then the ERO can expand, as additional functional responsibilities are needed.
o EOF staffing may be required fr>r extended periods of time (e.g., greater than 10 days !'or BDBEEs. ELAP, etc.). 3.1.4 !.E.additional personnel are needed to support the emergency or for 24-hour coverage, THEN refer to the following for telephone numbers:
o When the complexity decreases. then the ERO can contract, when those additional functional responsibilities are no longer needed.
* ERO Member Contact lnfon1rntion notebook on the EOF Director's Area bookshelf (home, office and cell phone numbers).
o The makeup and structure of the EOF will be determined by the EOF Director.
* Duke Energy Enterprise Phone Book (ot1ice and cell phone numbers).
o EOF staffing may be required fr>r extended periods of time (e.g., greater than 10 days !'or BDBEEs. ELAP, etc.).
* Emergency Response Organization (ERO) database by contacting the EOF Emergency Planner.
3.1.4  
3.1.5 !.E.equipment problems occur, THEN contact the following:
!.E.additional personnel are needed to support the emergency or for 24-hour coverage, THEN refer to the following for telephone numbers:
* Computer-EOF Data Coordinator o Communications systems and other facility equipment-EOF Services Manager SRJO/ A/2000/003 Page 4of8 NOTE: When using the OAC to trend plant data for decision  
ERO Member Contact lnfon1rntion notebook on the EOF Director's Area bookshelf (home, office and cell phone numbers).
: purposes, please note that reducing the trend screen overall size can cause the plotted data to be suspect upon restoration to full size. It is recommended that trend plots be mini1i1ized using the standard windows button (the button in the top right that has the underbar).
Duke Energy Enterprise Phone Book (ot1ice and cell phone numbers).
The software code is designed to refresh the trend screens upon restoration to full size from a minimized state. A second method is to have the OAC redraw the trend after restoring the trend screen to full size. 3.2 IE.access to SDS data is desired, THEN login to system as follows:
Emergency Response Organization (ERO) database by contacting the EOF Emergency Planner.
3.2.1 From DAE main screen, select Search DAE tab. 3.2.2 Type SDS in Search box press Enter. 3.2.3 Select Catawba OAC SDS, McGuire OAC SDS. or Oconee OAC SDS as applicable.
3.1.5  
!.E.equipment problems occur, THEN contact the following:
Computer-EOF Data Coordinator o
Communications systems and other facility equipment-EOF Services Manager  
 
SRJO/ A/2000/003 Page 4of8 NOTE: When using the OAC to trend plant data for decision purposes, please note that reducing the trend screen overall size can cause the plotted data to be suspect upon restoration to full size. It is recommended that trend plots be mini1i1ized using the standard windows button (the button in the top right that has the underbar). The software code is designed to refresh the trend screens upon restoration to full size from a minimized state. A second method is to have the OAC redraw the trend after restoring the trend screen to full size.
3.2 IE.access to SDS data is desired, THEN login to system as follows:
3.2.1 From DAE main screen, select Search DAE tab.
3.2.2 Type SDS in Search box ~\\nd press Enter.
3.2.3 Select Catawba OAC SDS, McGuire OAC SDS. or Oconee OAC SDS as applicable.
3.2.4 Select Run Application.
3.2.4 Select Run Application.
3.2.5 Logon with LAN ID and Password as follows:
3.2.5 Logon with LAN ID and Password as follows:
NAM\UserlD Password 3.2.6 Select the desired OAC to access by checking the box and then clicking the Start bullon. You can start multiple sessions if desired.
NAM\\UserlD Password 3.2.6 Select the desired OAC to access by checking the box and then clicking the Start bullon. You can start multiple sessions if desired.
CNS 0 Cl RT PRI *; C2 RT PRI 0 Cl RTBAC
CNS 0
* C2RTBAC o. ProDAC
Cl RT PRI C2 RT PRI 0
Cl RTBAC
* C2RTBAC
: o.
ProDAC
* Simulator
* Simulator
* Spare Sim Q EPSim 0 EDS MNS
* Spare Sim Q
* Ml RTSPRI 0 Ml RTS BAC
EPSim 0
* M2 RTS PRI .. M2RTSBAC
EDS MNS
* Ml RTSPRI 0
Ml RTS BAC
* M2 RTS PRI M2RTSBAC
* ProDaC
* ProDaC
* Simulator
* Simulator
* Sim Backup to EDS ONS ** OlOAC
* Sim Backup to EDS  
 
ONS OlOAC
* 020AC
* 020AC
* 030AC
* 030AC KHUOAC Simulato1* A
* KHUOAC
* Simulator B Simulator ICS Sim Develop ProUaC 3.2. 7 Access emergency response displays as follows:
* Simulato1*
Catawba/McGuire SRJ01 A/2000/003 Page 5of8 Enter GD (space)"Group Display Name" in the white box at the upper right portion ofthc screen.
A
Catawba Specific Group Display Name EMF ERDSl ERDS2 EROCONT EROCOREI EROCORE2 EROCORE3 EROfNJCT ERO PLEAK EROS LEAK EROPRJM ERORXG EROSAMG EROSECND MET Group Display Description Selected EMF data and locations EROS Group I ERDS Group 2 Selected values associated with containment.
* Simulator B
lncore temperature values Additional incore temperature values Additional incore temperature values Selected letdown/charging values Selected primary to contaimnent leakage values Selected primary to secondary leakage values Selected primary system values Selected Value for Reactor Engineer Selected SAMO Values Selected secondary system values Met Tower Points McGuire Specific Group Displav Name EMF ER0-1 EROCONT EROCORE EROINJCT ERO PRIM EROSECND WEATHER Group Display Description Selected EMF data and locations Selected plant parameters Emergency Response Containment Emergency Response Incore Emergency Response Injection Emergency Response Primary Emergency Response Secondary.
* Simulator ICS
Weather Data  
* Sim Develop ., ProUaC 3.2. 7 Access emergency response displays as follows:
 
Catawba/McGuire SRJ01 A/2000/003 Page 5of8 Enter GD (space)"Group Display Name" in the white box at the upper right portion ofthc screen. Catawba Specific Group Display Name EMF ERDSl ERDS2 EROCONT EROCOREI EROCORE2 EROCORE3 EROfNJCT ERO PLEAK EROS LEAK EROPRJM ERORXG EROSAMG EROSECND MET Group Display Description Selected EMF data and locations EROS Group I ERDS Group 2 Selected values associated with containment.
Oconee SR/0/ A/2000/003 Page 6of8 Enter applicable Turn On code in the white box at the upper right portion of the screen.
lncore temperature values Additional incore temperature values Additional incore temperature values Selected letdown/charging values Selected primary to contaimnent leakage values Selected primary to secondary leakage values Selected primary system values Selected Value for Reactor Engineer Selected SAMO Values Selected secondary system values Met Tower Points '-------------------------------*------
Oconee Specific Turn On Code Name ERO MENU EROPRI EROS EC ERO CONT ERO AUX ERO AREA EROPROC EROENV EROECCS ERDSMENU RBOI Turn On Code Description Menu Access for Oconee Data Screens Selected Primary System values Selected Secondary System values Selected Containment Condition values Selected Radiation Monitor values Selected Area Radiation Monitor values Selected Process Radiation Monitor values Selected values for Dose Assessment and Field Monitoring use Selected ECCS values Menu Access for Oconee EROS Data Selected Dose Assessment Data 3.3 The Emergency Plant Status application bas also been established for Oconee emergency response use. This application is available from DAE.
McGuire Specific Group Displav Name EMF ER0-1 EROCONT EROCORE EROINJCT ERO PRIM EROSECND WEATHER Group Display Description Selected EMF data and locations Selected plant parameters Emergency Response Containment Emergency Response Incore Emergency Response Injection Emergency Response Primary Emergency Response Secondary.
3.3.1 To launch the Emergency Plant Status application. from DAE select Seard1 DAE and type in Emergency Plant Status.
Weather Data Oconee SR/0/ A/2000/003 Page 6of8 Enter applicable Turn On code in the white box at the upper right portion of the screen. Oconee Specific Turn On Code Name ERO MENU EROPRI EROS EC ERO CONT ERO AUX ERO AREA EROPROC EROENV EROECCS ERDSMENU RBOI Turn On Code Description Menu Access for Oconee Data Screens Selected Primary System values Selected Secondary System values Selected Containment Condition values Selected Radiation Monitor values Selected Area Radiation Monitor values Selected Process Radiation Monitor values Selected values for Dose Assessment and Field Monitoring use Selected ECCS values Menu Access for Oconee EROS Data Selected Dose Assessment Data -----*-*--------------------------------'
3.3.2 Select the Emergency Plant Status - ONS 3.3.3 Select Run Application 3.3.4 Enter your password and verify domain as NAM.
3 .3 The Emergency Plant Status application bas also been established for Oconee emergency response use. This application is available from DAE. 3.3.1 To launch the Emergency Plant Status application.
3.4 IF EOF facility in Energy Center is unavailable, THEN establish Alternate EOF at designated alternate location {IER Lt-13-10}:
from DAE select Seard1 DAE and type in Emergency Plant Status. 3.3.2 Select the Emergency Plant Status -ONS 3.3.3 Select Run Application 3.3.4 Enter your password and verify domain as NAM. 3.4 IF EOF facility in Energy Center is unavailable, THEN establish Alternate EOF at designated alternate location  
o Catawba Nuclear Station event - McGuire Administration Building per Enclosure 6.24 o
{IER Lt-13-10}:
McGuire Nuclear Station event - Catawba Administration Building per Enclosure 6.25 ci.
o Catawba Nuclear Station event -McGuire Administration Building per Enclosure 6.24 o McGuire Nuclear Station event -Catawba Administration Building per Enclosure 6.25 ci. Oconee Nuclear Station event -Catawba Administration Building per Enclosure 6.25 srvO; A/20001003 Page 7of8 3.5 Perform the applicable actions for the event using instructions and guidance in the following enclosures:  
Oconee Nuclear Station event - Catawba Administration Building per Enclosure 6.25  
-*-*-*----*-
 
ERO Position Title Enclosure EOF Director/Assistant EOF Director 6.1 EOF Director/Assistant EOF Director Checklist  
srvO; A/20001003 Page 7of8 3.5 Perform the applicable actions for the event using instructions and guidance in the following enclosures:
.. ---**-**-**---
ERO Position Title Enclosure EOF Director/Assistant EOF Director 6.1 EOF Director/Assistant EOF Director Checklist Radiological Assessment Manager 6.6 Radiological Assessment Manager Checklist EOF Dose Assessor 6.7 EOF Dose Assessor Checklist Field Monitoring Coordinator 6.8 Field Monitoring Coordinator Checklist i---
... -*--** __ ,,,,, ___ Radiological Assessment Manager 6.6 Radiological Assessment Manager Checklist
Radio Operator 6.9 Radio Operator Checklist EOF OITsite Agency Communicator
__ .,, EOF Dose Assessor 6.7 EOF Dose Assessor Checklist Field Monitoring Coordinator 6.8 Field Monitoring Coordinator Checklist i----* Radio Operator 6.9 Radio Operator Checklist  
: 6. 10 EOF Offsite Agency Communicator Checklist EOF Services
..... _... ,_,, EOF OITsite Agency Communicator  
: 6. 10 EOF Offsite Agency Communicator Checklist  
-*-* EOF Services  
: 6. 11 EOF Services Administration/Commissary Adm in i strati on/ C01 n rn i ssary Checklist  
: 6. 11 EOF Services Administration/Commissary Adm in i strati on/ C01 n rn i ssary Checklist  
*--*-.. *-*--*-* ..
-*-*.. ~--*-
...... ...........
Accident Assessment Manager 6.12 Accident Assessment Manager Checklist Accident Assessment Interface
.. ........
: 6. 13 Accident Assessment Interface Checklist Operations Interface Checklist 6.14 Operations Interface Checklist EOF Emergency Planner 6.15 EOF Emergency Planner Checklist EOF Log Recorder 6.16 EOF Log Recorder Checklist EOF Data Coordinator 6.17 EOF Data Coordinator Checklist EOF Services Manager 6.18 EOF Services Manager Checklist
_ Accident Assessment Manager 6.12 Accident Assessment Manager Checklist  
: 4. REFERENCES 4.1 Catawba Nuclear Station (CNS) Emergency Plan 4.2 McGuire Nuclear Station (MNS) Emergency Plan 4.3 Oconee Nuclear Station (ONS) Emergency Plan  
----Accident Assessment Interface  
 
: 6. 13 Accident Assessment Interface Checklist  
I 5. RECORDS s1v01 A/20001003 Page 8 of 8
----* Operations Interface Checklist 6.14 Operations Interface Checklist EOF Emergency Planner 6.15 EOF Emergency Planner Checklist EOF Log Recorder 6.16 EOF Log Recorder Checklist EOF Data Coordinator 6.17 EOF Data Coordinator Checklist EOF Services Manager 6.18 EOF Services Manager Checklist  
: 5. I All Jogs, forms and records completed as the result of implementing this procedure during an actual declared event shall be retained as pennanent plant records. Nuclear Generation Record Retention Rule Number 421734, "Procedures-Technical Completed."
: 4. REFERENCES 4.1 Catawba Nuclear Station (CNS) Emergency Plan 4.2 McGuire Nuclear Station (MNS) Emergency Plan 4.3 Oconee Nuclear Station (ONS) Emergency Plan I 5. RECORDS s1v01 A/20001003 Page 8 of 8 5. I All Jogs, forms and records completed as the result of implementing this procedure during an actual declared event shall be retained as pennanent plant records.
5.2 All checklists, logs and forms completed as the result of implementing this procedure shall be collected at the end of the event and provided to the site Emergency Preparedness Manager.
Nuclear Generation Record Retention Rule Number 421734, "Procedures-Technical Completed."
: 6. Enclosures 6.1 EOF Director/Assistant EOF Director Checklist 6.2 Catawba Offsite Protective Actions 6.3 McGuire Offsite Protective Actions 6.4 Oconee Offsite Protective Actions 6.5 Emergency Classification Downgrade/Termination 6.6 Radiological Assessment Manager Checklist 6.7 EOF Dose Assessor Checklist 6.8 Field Monitoring Coordinator Checklist 6.9 Radio Operator Checklist 6.10 EOF Offsitc Agency Communicator Checklist 6.11 EOF Services Administration/Commissary Checklist 6.12 Accident Assessment Manager Checklist 6.13 Accident Assessment Interface Cht::cklist 6.14 Operations Interface Checklist 6.15 EOF Emergency Planner Checklist 6.16 EOF Log Recorder Checklist 6.17 EOF Data Coordinator Checklist 6.18 EOF Services Manager Checklist 6.19 Establishing Communications Links Between McGuire SAMO Evaluators 6.20 Oconee Recovery Guidelines 6.21 Keowee Hydro Dam/Dikes - Imminent Failure/Potential Failure Descriptions 6.22 EOF Evacuation Checklist 6.23 EOF Briefing Guideline 6.24 Setup of Catawba Alternate EOF in McGuire Admin Bldg.
5 .2 All checklists, logs and forms completed as the result of implementing this procedure shall be collected at the end of the event and provided to the site Emergency Preparedness Manager.  
6.25 Setup of McGuire or Oconee Alternate EOF in Catawba Adm in Bldg.
: 6. Enclosures 6.1 EOF Director/Assistant EOF Director Checklist 6.2 Catawba Offsite Protective Actions 6.3 McGuire Offsite Protective Actions 6.4 Oconee Offsite Protective Actions 6.5 Emergency Classification Downgrade/Termination 6.6 Radiological Assessment Manager Checklist 6.7 EOF Dose Assessor Checklist 6.8 Field Monitoring Coordinator Checklist 6.9 Radio Operator Checklist 6.10 EOF Offsitc Agency Communicator Checklist 6.11 EOF Services Administration/Commissary Checklist 6.12 Accident Assessment Manager Checklist 6.13 Accident Assessment Interface Cht::cklist 6.14 Operations Interface Checklist 6.15 EOF Emergency Planner Checklist 6.16 EOF Log Recorder Checklist 6.17 EOF Data Coordinator Checklist 6.18 EOF Services Manager Checklist 6.19 Establishing Communications Links Between McGuire SAMO Evaluators 6.20 Oconee Recovery Guidelines 6.21 Keowee Hydro Dam/Dikes  
6.26 NRC Response Team Briefing 6.27 Commitments for SR/O/B/2000/003  
-Imminent Failure/Potential Failure Descriptions 6.22 EOF Evacuation Checklist 6.23 EOF Briefing Guideline 6.24 Setup of Catawba Alternate EOF in McGuire Admin Bldg. 6.25 Setup of McGuire or Oconee Alternate EOF in Catawba Adm in Bldg. 6.26 NRC Response Team Briefing 6.27 Commitments for SR/O/B/2000/003 INITIAL Enclosure 6.1 EOF Director/Assistant EOF Director Checklist*
 
SR/0/ A/2000/003 Page 1 of 15 NOTE: Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.
INITIAL.1 EOF Director/Assistant EOF Director Checklist*
SR/0/ A/2000/003 Page 1 of 15 NOTE:
Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.
__ IE reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.
__ IE reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.
__ Don position badge. __ Log in to PC. __ Log in to WebEOC. __ Sign in on Sign In board. NOTE: The EOF Log Recorder will maintain the official log for the EOF Direct.or/Assistant EOF Director.
__ Don position badge.
The EOF Director/Assistant EOF Director may maintain an additional log if desired.
__ Log in to PC.
__ Establish Position Log of' activities sufficient to conduct turno\;cr for on-coming shift. __ Establish communications with Emergency Coordinator or Assistant Emergency Coordinator in affected site's TSC: Q Use affected site's EOF Director to Emergency Coordinator Ringdown phone (Catawba and McGuire only) OR o Catawba TSC, 9-1-803-701-5870 QB e McGuire TSC. 9-1-704-875-1951 OR o Oconee TSC. 9-1-864-873-3921  
__ Log in to WebEOC.
<> IE communications cannot be established using normal phones, THEN refer to procedure AD-EP-ALL-0406, Duke Emergency Management Network (DEMNET).
__ Sign in on Sign In board.
for instructions on using DEMNET. NOTE: EOF access is controlled through the use of a monitored card reader process.
NOTE:
__ Verify Energy Center Building Security personnel are monitoring the EOF entrance card reader. NOTE: The following step is needed for EOF data display.
The EOF Log Recorder will maintain the official log for the EOF Direct.or/Assistant EOF Director. The EOF Director/Assistant EOF Director may maintain an additional log if desired.
The Accident Assessment Manager updates the Fission Product Barrier status board. __ Establish Fission Product Barrier status board display as follows.
__ Establish Position Log of' activities sufficient to conduct turno\\;cr for on-coming shift.
__ Establish communications with Emergency Coordinator or Assistant Emergency Coordinator in affected site's TSC:
Q Use affected site's EOF Director to Emergency Coordinator Ringdown phone (Catawba and McGuire only)
OR o
Catawba TSC, 9-1-803-701-5870 QB e
McGuire TSC. 9-1-704-875-1951 OR o
Oconee TSC. 9-1-864-873-3921  
<> IE communications cannot be established using normal phones, THEN refer to procedure AD-EP-ALL-0406, Duke Emergency Management Network (DEMNET). for instructions on using DEMNET.
NOTE:
EOF access is controlled through the use of a monitored card reader process.
__ Verify Energy Center Building Security personnel are monitoring the EOF entrance card reader.
NOTE:
The following step is needed for EOF data display. The Accident Assessment Manager updates the Fission Product Barrier status board.
__ Establish Fission Product Barrier status board display as follows.
D Log in to Assistant EOF Director computer.
D Log in to Assistant EOF Director computer.
D Log in to WebEOC.
D Log in to WebEOC.  
Enclosure 6.1 EOF Director/Assistant EOF Director Checklist D Click on Fission Product Barrier Status -SITE. D Drag to right monitor AND maximize.
.1 EOF Director/Assistant EOF Director Checklist D Click on Fission Product Barrier Status - SITE.
SR/0/ N2000/003 Page 2of15 INITIALS
D Drag to right monitor AND maximize.
___ _ PRINTED NAME ___________  
SR/0/ N2000/003 Page 2of15 INITIALS ___
(EOF Director)
PRINTED NAME ___________ (EOF Director)
INITIALS
INITIALS ___ _
___ _ PRINTED NAME ___________  
PRINTED NAME ___________ (Asst. EOF Director)  
(Asst. EOF Director)
 
NOTE: I. Enclosure 6.1 EOF Director/Assistant EOF Director  
NOTE:
,Checklist SRJO/ A/2000/003 Page 3of15 IF the emergency situation prevents activating the TSC within 75 minutes .of declaration, THEN the Control Room will: c Turn over responsibility for state and county notification and Protective Action Recommendations to EOF. 1:1 Maintain responsibility for NRC Event Notification until released by NRC Communicator in TSC.
I..1 EOF Director/Assistant EOF Director  
* Maintain responsibility for classifications and continuous phone communications to the NRC until relieved by the Emergency Coordinator (EC) and NRC Communicator in the TSC. 2. IF TSC remains unavailable and EOF cannot take responsibility for state and county notification and Protective Action Recommendations, the Control Room will maintain these responsibilities.
,Checklist SRJO/ A/2000/003 Page 3of15 IF the emergency situation prevents activating the TSC within 75 minutes.of declaration, THEN the Control Room will:
__ IF emergency situation prevents activating TSC within 75 minutes of declaration, THEN contact affected Site's Control Room: Person Notified/Date/Time D Catawba Control Room. 9-803-701-5164
c Turn over responsibility for state and county notification and Protective Action Recommendations to EOF.
________
1:1 Maintain responsibility for NRC Event Notification until released by NRC Communicator in TSC.
_ *-------..:/
Maintain responsibility for classifications and continuous phone communications to the NRC until relieved by the Emergency Coordinator (EC) and NRC Communicator in the TSC.
__ _ O McGuire Control Room. 9-980-875-4138
: 2.
_____________  
IF TSC remains unavailable and EOF cannot take responsibility for state and county notification and Protective Action Recommendations, THl~N the Control Room will maintain these responsibilities.
./ ___ _ O Oconee Unit 1and2 Control Room. 9-1-864-873-2159  
__ IF emergency situation prevents activating TSC within 75 minutes of declaration, THEN contact affected Site's Control Room:
/ ___ _ 0 Oconee Unit 3 Control Room, 9-1-864-873-2160 I -----__ Verify EOF minimum staffing positions are prepared to assume their EOF duties prior to declaring the EOF operational:
Person Notified/Date/Time D Catawba Control Room. 9-803-701-5164 ________ _ *-------..:/ __ _
O McGuire Control Room. 9-980-875-4138 _____________./ ___ _
O Oconee Unit 1and2 Control Room. 9-1-864-873-2159  
/ ___ _
0 Oconee Unit 3 Control Room, 9-1-864-873-2160 I -----
__ Verify EOF minimum staffing positions are prepared to assume their EOF duties prior to declaring the EOF operational:
EOF Director Accident Assessment Manager Radiological Assessment Manager Off-Site Agency Communicator Off-Site Agency Communicator.
EOF Director Accident Assessment Manager Radiological Assessment Manager Off-Site Agency Communicator Off-Site Agency Communicator.
OR lE Less than the above listed minimum EOF positions are filled, The 75-minute EOF operational time requirement is near, ANU An extra person(s) is available whom the EOF Director believes is capable of filling a missing position(s) based on the training, experience and skills required by the ERO training program -ETQS 7111.0, Emergency Response Training An appropriate log entry is m.ade. Request Assistant EOF Director monitor EOF multi-function machine for faxes sent to 704-382-1825.
OR lE Less than the above listed minimum EOF positions are filled,  
NOTE: Enclosure 6.1 EOF Director/Assistant EOF Director Checklist SR/0/ A/2000/003 Page 4of15 For all drills. messages should be preceded with "This is a drill. This is a drill." __ Announce over EOF public address system: "Anyone who is reporting to this facility outside of your normal work hours must complete a Fitness for the Duty Form. If you have consumed alcohol within the past five (5) hours or believe your work quality may be compromised due to fatigue,  
~
: sickness, or other potentially impairing conditions, notify either the EOF Director, Assistant EOF Director, or the appropriate lead in your functional area. 11 __ Declare EOF operational.
The 75-minute EOF operational time requirement is near, ANU An extra person(s) is available whom the EOF Director believes is capable of filling a missing position(s) based on the training, experience and skills required by the ERO training program -
EOF operational time: __ **---------
ETQS 7111.0, Emergency Response Training  
NOTE: For all drills. messages should be preceded with "This is a drill. This is a drill. 11 __ Announce over EOF public address system: "Attention all EOF personnel.
~
This is _________
An appropriate log entry is m.ade.
ancl as or ___ . __ hours, (EOF IJ1rcctor's the EOF is operational.
Request Assistant EOF Director monitor EOF multi-function machine for faxes sent to 704-382-1825.  
Each EOF functional area should perform a Take a Minute in its work area." __ Notify Emergency Coordinator or Assistant Emergency Coordinator that the EOF is: -Operational  
 
-Gathering plant status information  
NOTE:.1 EOF Director/Assistant EOF Director Checklist SR/0/ A/2000/003 Page 4of15 For all drills. messages should be preceded with "This is a drill. This is a drill."
-Ready to receive turnover of state and county notification and Protective Action Recommendation responsibilities at the Emergency Coordinator's convenience.
__ Announce over EOF public address system:  
"Anyone who is reporting to this facility outside of your normal work hours must complete a Fitness for the Duty Form. If you have consumed alcohol within the past five (5) hours or believe your work quality may be compromised due to fatigue, sickness, or other potentially impairing conditions, notify either the EOF Director, Assistant EOF Director, or the appropriate lead in your functional area.
11
__ Declare EOF operational. EOF operational time: __ **---------
NOTE:
For all drills. messages should be preceded with "This is a drill. This is a drill.
11
__ Announce over EOF public address system:  
"Attention all EOF personnel. This is _________ ancl as or ___. __ hours, (EOF IJ1rcctor's Nam~)
the EOF is operational. Each EOF functional area should perform a Take a Minute in its work area."
__ Notify Emergency Coordinator or Assistant Emergency Coordinator that the EOF is:  
- Operational  
- Gathering plant status information  
- Ready to receive turnover of state and county notification and Protective Action Recommendation responsibilities at the Emergency Coordinator's convenience.
__ Review definitions in Section 2 of this procedure.
__ Review definitions in Section 2 of this procedure.
NOTE: The following step may be accomplished by conducting a Time Out or by verifying the level of readiness with the individuals in the positions.
NOTE:
The following step may be accomplished by conducting a Time Out or by verifying the level of readiness with the individuals in the positions.
__ Verify the following positions, at a minimum, are ready to activate and prepared to perform the next offsite agency notification.
__ Verify the following positions, at a minimum, are ready to activate and prepared to perform the next offsite agency notification.
__ Accident Assessment Manager __ Radiological Assessment Manager __ Lead Off-Site Agency Communicator Enclosure
__ Accident Assessment Manager
: 6. t EOF Director/Assistant EOF Director Checklist SR/0/ A/2000/003 Page 5of15 NOTE: The Emergency Coordinator or Assistant Emergency Coordinator should fax the Emergency Coordinator Turnover Checklist to the EOF. The "Emergency Coordinator Turnover Checklist" is provided on page 15 of this enclosure.
__ Radiological Assessment Manager
__ Lead Off-Site Agency Communicator  
. t EOF Director/Assistant EOF Director Checklist SR/0/ A/2000/003 Page 5of15 NOTE:
The Emergency Coordinator or Assistant Emergency Coordinator should fax the Emergency Coordinator Turnover Checklist to the EOF. The "Emergency Coordinator Turnover Checklist" is provided on page 15 of this enclosure.
__ IF a classification change occurs during turnover, THEN suspend turnover until CR OR TSC declares and transmits notification to offsite agencies.
__ IF a classification change occurs during turnover, THEN suspend turnover until CR OR TSC declares and transmits notification to offsite agencies.
__ Receive turnover from Emergency Coordinator or Assistant Emergency Coordinator utilizing the "Emergency Coordinator Turnover Checklist" or equivalent.
__ Receive turnover from Emergency Coordinator or Assistant Emergency Coordinator utilizing the "Emergency Coordinator Turnover Checklist" or equivalent.
Prepare or delegate to Assistant EOF Director preparations for briefing NRC by completing job aid in Enclosure 6.26 NOTE: The EOF Director is responsible for approving Protective Action Recommendations, and approving Oflsite Agency Emergency Notification Forms after the EOF is activated.
Prepare or delegate to Assistant EOF Director preparations for briefing NRC by completing job aid in Enclosure 6.26 NOTE:
These responsibilities remain with the EOF Director and shall not be delegated.
The EOF Director is responsible for approving Protective Action Recommendations, and approving Oflsite Agency Emergency Notification Forms after the EOF is activated. These responsibilities remain with the EOF Director and shall not be delegated.
__ Inform Emergency Coordinator that EOF is ready to activate.
__ Inform Emergency Coordinator that EOF is ready to activate.
NOTE: For all drills, messages should be preceded with "This is a drill. This is a drill." __ Announce over the EOF public address system: "Attention all EOF personnel. The EOF was activated at hours. This is ------* I am the EOF Director and have taken responsibility for emergency management from the Emergency Coordinator in the Technical Support Center. At this time, the EOF has command and control for off site notifications.
NOTE:
protective action recommendations.
For all drills, messages should be preceded with "This is a drill. This is a drill."
field monitoring, and offsite agency interface.
__ Announce over the EOF public address system:  
The current emergency classification is The following is a summary of the plant status Additional information will be provided to you as conditions change. The next offsite agency notification shall be transmitted by hours. The EOF staff shall prepare for a tin,1e-out and a roundtable discussion at hours." ___ . IF AT ANY TIME there is a need to deviate from nonnal work practices, THEN refer to OP-ALL-1000, Conduct of Operations.
"Attention all EOF personnel. The EOF was activated at hours. This is  
Attachment 7, Deviations from Nonna} Work Processes/Requirements Documentation.
------* I am the EOF Director and have taken responsibility for emergency management from the Emergency Coordinator in the Technical Support Center. At this time, the EOF has command and control for off site notifications. protective action recommendations.
to document the deviation.  
field monitoring, and offsite agency interface. The current emergency classification is The following is a summary of the plant status Additional information will be provided to you as conditions change. The next offsite agency notification shall be transmitted by hours. The EOF staff shall prepare for a tin,1e-out and a roundtable discussion at hours."
{ IER L 1-13-10)
___. IF AT ANY TIME there is a need to deviate from nonnal work practices, THEN refer to AD-OP-ALL-1000, Conduct of Operations. Attachment 7, Deviations from Nonna} Work Processes/Requirements Documentation. to document the deviation. { IER L 1-13-10)
__ Review current emergency classification with EOF staff and verify it meets criteria in: o Catawba RP/O/ A/50001001  
__ Review current emergency classification with EOF staff and verify it meets criteria in:
.QR McGuire RP/O/ A/5700/000 QR
o Catawba RP/O/ A/50001001  
* Oconee RP IOI Al 1000/001.
.QR  
Enclosure 6.1 EOF Director/Assistant EOF Director Checklist SR/0/ A/2000/003 Page 6of15 __ IF a Hostile Action Based (HAB) event .AlYll an Incident Command Post (JCP) has been established, THEN ensure EOF communications with Control Room and Operations ICP Liaison as follows:  
*~
: o. Catawba Operations ICP Bridge Line 9-803-701-5708 (Spare ICP Bridge Line 9-803-701-5800). McGuire Operations Bridge Line 9-980-875-4500.
McGuire RP/O/ A/5700/000 QR Oconee RP IOI Al 1000/001.  
o Oconee Operations ICP Bridge Line 9-1-864-885-4908 (Spare ICP Bridge Line 9-1-864-873-4905). I. The first message from the EOF should include EOF activation time on Line 12. 2. IF data changes during review of the emergency notification form, it is a good practice to require the EOF staff to do a "clean sweep" through the form prior to approval.
.1 EOF Director/Assistant EOF Director Checklist SR/0/ A/2000/003 Page 6of15
Enclosure 6.1 EOF Dfrector/Assistant EOF Director Checklist SR/0/ A/2000/003 Page 7 of I 5 __ Notify Offsite Agency Communicator to make emergency notifications according to the following schedule:
__ IF a Hostile Action Based (HAB) event.AlYll an Incident Command Post (JCP) has been established, THEN ensure EOF communications with Control Room and Operations ICP Liaison as follows:
Initial Notifications I. Initial notifications to the State(s) and counties must be made within 15 minutes of the event declaration time using the Emergency Notification form (ENF}. 2. For an upgrade in classification prior to or while transmitting an initial message:  
NOTI~:
-The notification for the lesser classification must be made within 15 minutes of the lesser classification declaration time. -The agencies must be infrmned that an upgrade in classification will be coming. -The upgraded classification message must be transmitted within 15 minutes of the upgraded classification declaration time. 3. Initial messages in the General Emergency classification that involve an upgrade in PA Rs must be communicated to the offsite agencies as soon ns possible and within l 5 minutes.
: o.
Catawba Operations ICP Bridge Line 9-803-701-5708 (Spare ICP Bridge Line 9-803-701-5800).  
~ McGuire Operations Bridge Line 9-980-875-4500.
o Oconee Operations ICP Bridge Line 9-1-864-885-4908 (Spare ICP Bridge Line 9-1-864-873-4905).
I. The first message from the EOF should include EOF activation time on Line 12.
: 2. IF data changes during review of the emergency notification form, it is a good practice to require the EOF staff to do a "clean sweep" through the form prior to approval.  
.1 EOF Dfrector/Assistant EOF Director Checklist SR/0/ A/2000/003 Page 7 of I 5
__ Notify Offsite Agency Communicator to make emergency notifications according to the following schedule:  
*****-*----------------------------~
Initial Notifications I. Initial notifications to the State(s) and counties must be made within 15 minutes of the event declaration time using the Emergency Notification form (ENF}.
: 2. For an upgrade in classification prior to or while transmitting an initial message:  
-The notification for the lesser em~rgency classification must be made within 15 minutes of the lesser classification declaration time.  
-The agencies must be infrmned that an upgrade in classification will be coming.  
-The upgraded classification message must be transmitted within 15 minutes of the upgraded classification declaration time.
: 3. Initial messages in the General Emergency classification that involve an upgrade in PA Rs must be communicated to the offsite agencies as soon ns possible and within l 5 minutes.
Follow-up Notifications I. Follow-up notifications to the State(s) and Counties must be made according, to the following schedule:
Follow-up Notifications I. Follow-up notifications to the State(s) and Counties must be made according, to the following schedule:
Catawba McGuire Oconee -For NOUE, ALERT, SAE, or GE, -For NOUE, every 4 hours until the -For NOUE, a follow-up is not every hour until the emergency is emergency is terminated.
Catawba McGuire Oconee  
-For NOUE, ALERT, SAE, or GE,  
-For NOUE, every 4 hours until the  
-For NOUE, a follow-up is not every hour until the emergency is emergency is terminated.
required.
required.
terminated.  
terminated.  
-For ALERT, SAE, or GE, -For ALERT, SAE, or GE, every 60 Catawba -If there is any significant change to the situation (make notification as soon as possible).
-For ALERT, SAE, or GE,  
-For ALERT, SAE, or GE, every 60 Catawba  
-If there is any significant change to the situation (make notification as soon as possible).
every hour until the emergency is minutes until the emergency is terminated.
every hour until the emergency is minutes until the emergency is terminated.
terminated.
terminated.
OR McGuire -If there is any significant change to the silu:.ition (make notification as soon as possible).  
OR McGuire  
----*-----*-*****-*-----------------**-
-If there is any significant change to the silu:.ition (make notification as soon as possible).
Oconee -If there is any significant change to the situation (make notification as the change occurs).
Oconee
See NOTE* below for examples of changes . ...........
-If there is any significant change to the situation (make notification as the change occurs). See NOTE*
Catawba -As agreed upon with an Emergency Management official from eac.h_individual agency. Documentation shall be maintained for any agreed upon schedule change. -The interval shall not be greater than 4 hours to any agency. OR McGuire -As agreed upon with an Emergency Management official from each individual agency. Documentation shall be maintained for any agreed upon schedule change. -The interval for ALERT, SAE, or GE shall not be greater than 2 hours to any agency. Oconee -Required every 60 minutes from the notification time on Line 14 for ALERT, SAE, or GE. -This frequency may be changed at the request of offsite agencies.  
below for examples of changes.  
*NOTE (Oconee):
........... -~~------~~---~--~*-*~---~---~~~~----~~~~~~~--~
Examples of significant plant changes include:
Catawba  
evacuation/relocation of site personnel, fires onsite, MERT activation and/or injured personnel transported off'iite, chemical spills, explosions, Condition "A" or "B" for Kemvee Hydro Project Dams/Dikes, or any event that would cause or require offsite agency response.  
-As agreed upon with an Emergency Management official from eac.h_individual agency.
: 2. If a follow-up is due and an upgrade to a higher classification is declared, there is no need to complete the up ENF. In this case, the offsite agencies must be notified that the pending follow-up is being superseded by an upgrade to a higher classification and information will be provided.
Documentation shall be maintained for any agreed upon schedule change.  
Enclosure 6.1 EOF Director/Assistant EOF Director Checklist SR/0/ A/2000/003 Page 8of15 .,,..---"IF' TIME Site Area Emergency is declared, IHEN consult Accident Assessment Manager and Radiological Assessment Manager to detem1ine potential zones for protective action recommendations.
-The interval shall not be greater than 4 hours to any agency.
__ IF AT ANY TIME General Emergency is declared, THEN EOF Director shall IMMEDIATELY (within 15 minutes) make Protective Action Recommendations to offsile agencies on Emergency Notification Form (ENF) using: o Enclosure 6.2 -Catawba Offsite Protective Actions D Enclosure 6.3 -McGuire Offsite Protective Actions D Enclosure 6.4 -Oconee Offsite Protective Action __ IF changes lo Protective Action Recommendations are approved by the EOF Director.
OR McGuire  
THEN ensure changes are transmitted to offaite agencies within 15 minutes.
-As agreed upon with an Emergency Management official from each individual agency. Documentation shall be maintained for any agreed upon schedule change.  
CA lJTION: If a zone has been accurately selected for evacuation, it shall remain selected.
-The interval for ALERT, SAE, or GE shall not be greater than 2 hours to any agency.
__ Evaluate specific plant conditions.
Oconee  
offsite dose projections.
-Required every 60 minutes from the notification time on Line 14 for ALERT, SAE, or GE.  
field monitoring team data. and determine need to update Protective Action Recommendations.
-This frequency may be changed at the request of offsite agencies.  
__ Rc\*iew dose projections with Radiological Assessment Manager to determine if Protective Action Recommendations arc required beyond the I 0-mile EPZ. __ IF Protective Action Recommendations are required beyond l 0 miles. THEN notify the states and counties to consider sheltering/evacuation of general population beyond I 0-mile EPZ. NOTE: Descriptions of Kcowee Hydro Dam/Dike Imminent Failure/Potential Failure are provided in Enclosure 6.21. __ lF Imminent Dam Failure (Keowee or Jocassee) exists, THEN make Protective Action Recommendations to Oconee County and Pickens County for imminent/actual dam failure on Emergency Notification Form Line 6 (Other):
*NOTE (Oconee): Examples of significant plant changes include: evacuation/relocation of site personnel, fires onsite, MERT activation and/or injured personnel transported off'iite, chemical spills, explosions, Condition "A" or "B" for Kemvee Hydro Project Dams/Dikes, or any event that would cause or require offsite agency response.
Move residents living downs/ream of the Keowee Hydro Project dams to higher ground Prohibit trqfftc.flow across bridges ident{fied on your inundation maps until the danger has passed Enclosure 6.1 EOF Director/Assistant EOF Director Checklist SR/0/ A/2000/003 Page 9of15 __ Communicate, or delegate to the Assistant EOF Director the responsibility to communicate, plant status to County Directors of Emergency Management, State Liaisons or State Directors of Emergency Management:
: 2. If a follow-up is due and an upgrade to a higher classification is declared, there is no need to complete the follow-up ENF. In this case, the offsite agencies must be notified that the pending follow-up is being superseded by an upgrade to a higher classification and information will be provided.  
* EOF Stale Liaisons communicate information from EOF Director to County/State representatives using the Duke Emergency Management Network (DEMNET).
.1 EOF Director/Assistant EOF Director Checklist SR/0/ A/2000/003 Page 8of15  
NOTJ13: I. Detailed instructions for the use of the DEMNET Ethernet Phone are provided in AD-EP-ALL-0406, Duke Emergency Management Network (DEMNET).  
.,,..---"IF' AT_A~Y TIME Site Area Emergency is declared, IHEN consult Accident Assessment Manager and Radiological Assessment Manager to detem1ine potential zones for protective action recommendations.
: 2. All agencies for a specific site can be contacted on DEMNET using the appropriate DEMNET Plant Name "DL-ALL Call" on "DL-EOC Only" pre-designated group call. 3. A specific agency for a particular site can be contacted using a DEMNET point-to-point call. 4. State and County telephone numbers can be obtained from the appropriate site's Emergency Telephone Directory.
__ IF AT ANY TIME General Emergency is declared, THEN EOF Director shall IMMEDIATELY (within 15 minutes) make Protective Action Recommendations to offsile agencies on Emergency Notification Form (ENF) using:
o.2 - Catawba Offsite Protective Actions D.3 - McGuire Offsite Protective Actions D.4 - Oconee Offsite Protective Action
__ IF changes lo Protective Action Recommendations are approved by the EOF Director. THEN ensure changes are transmitted to offaite agencies within 15 minutes.
CA lJTION:
If a zone has been accurately selected for evacuation, it shall remain selected.
__ Evaluate specific plant conditions. offsite dose projections. field monitoring team data. and determine need to update Protective Action Recommendations.
__ Rc\\*iew dose projections with Radiological Assessment Manager to determine if Protective Action Recommendations arc required beyond the I 0-mile EPZ.
__ IF Protective Action Recommendations are required beyond l 0 miles. THEN notify the states and counties to consider sheltering/evacuation of general population beyond I 0-mile EPZ.
NOTE:
Descriptions of Kcowee Hydro Dam/Dike Imminent Failure/Potential Failure are provided in.21.
__ lF Imminent Dam Failure (Keowee or Jocassee) exists, THEN make Protective Action Recommendations to Oconee County and Pickens County for imminent/actual dam failure on Emergency Notification Form Line 6 (Other):
Move residents living downs/ream of the Keowee Hydro Project dams to higher ground Prohibit trqfftc.flow across bridges ident{fied on your inundation maps until the danger has passed  
.1 EOF Director/Assistant EOF Director Checklist SR/0/ A/2000/003 Page 9of15
__ Communicate, or delegate to the Assistant EOF Director the responsibility to communicate, plant status to County Directors of Emergency Management, State Liaisons or State Directors of Emergency Management:
EOF Stale Liaisons communicate information from EOF Director to County/State representatives using the Duke Emergency Management Network (DEMNET).
NOTJ13: I. Detailed instructions for the use of the DEMNET Ethernet Phone are provided in AD-EP-ALL-0406, Duke Emergency Management Network (DEMNET).
: 2. All agencies for a specific site can be contacted on DEMNET using the appropriate DEMNET Plant Name "DL-ALL Call" on "DL-EOC Only" pre-designated group call.
: 3. A specific agency for a particular site can be contacted using a DEMNET point-to-point call.
: 4. State and County telephone numbers can be obtained from the appropriate site's Emergency Telephone Directory.
o Use DEMNET OR EOF Director/Assistant EOF Director telephone to contact appropriate states/counties.
o Use DEMNET OR EOF Director/Assistant EOF Director telephone to contact appropriate states/counties.
Catawba Site Specific York ___________________
Catawba Site Specific York ___________________ _
_ __ Mecklenburg
__ Mecklenburg ________________ _
________________
Gaston McGuire Site Specific
_ Gaston McGuire Site Specific
__ Mecklenburg Gaston Lincoln------------------
__ Mecklenburg Gaston Lincoln------------------
Iredell Cabarrus------------------
Iredell Cabarrus------------------
NC _______________
NC _______________ _
_ Oconee Site Specific
Oconee Site Specific
__ Oconee County ______________
__ Oconee County ______________ _
_ __ Pickens County ______________
__ Pickens County ______________ _
_ SC ___________________
SC ___________________  
Enclosure 6.1 EOF Director/Assistant EOF Director Checklist SRJO/ A/2000/003 Page 10of15 __ IF Protective Action Recommendations have been provided to the States and Counties, request protective action decision information from the State Director of Emergency Preparedness (SDEP) AND County Director of Emergency Preparedness (CDEP): Zones Evacuated:
~
.1 EOF Director/Assistant EOF Director Checklist SRJO/ A/2000/003 Page 10of15
__ IF Protective Action Recommendations have been provided to the States and Counties, TH~:N request protective action decision information from the State Director of Emergency Preparedness (SDEP) AND County Director of Emergency Preparedness (CDEP):
Zones Evacuated: ~--------------------~
Zones Sheltered:
Zones Sheltered:
Information Received from: ---Inform Emergency Coordinator OR Assistant Emergency Coordinator of SDEPs and CDEPs protective action decisions and other offaite conditions.
Information Received from: ---
NOTE: Wireless mikes are available for use during round tables/timeouts.  
Inform Emergency Coordinator OR Assistant Emergency Coordinator of SDEPs and CDEPs protective action decisions and other offaite conditions.
{3 8} __ Perfonn the following steps as needed throughout the event: o Conduct a time-out and hold a roundtablc discussion approximately every hour, coordinated with the TSC with the EOF staff using Enclosure 6.23 to discuss:  
NOTE: Wireless mikes are available for use during round tables/timeouts. {3 8}
-Emergency Classification  
__ Perfonn the following steps as needed throughout the event:
-Protective Action Recommendations  
o Conduct a time-out and hold a roundtablc discussion approximately every hour, coordinated with the TSC with the EOF staff using Enclosure 6.23 to discuss:  
-Emergency Noli fication Form status -Offsite dose projections  
- Emergency Classification  
-Mitigation strategies  
- Protective Action Recommendations  
-Termination criteria as defined in Enclosure 6.5. o Ensure roundtables/time-outs enable EOF members to know what is going on, what to anticipate, and understand focus and priorities.
- Emergency Noli fication Form status  
- Offsite dose projections  
- Mitigation strategies  
- Termination criteria as defined in Enclosure 6.5.
o Ensure roundtables/time-outs enable EOF members to know what is going on, what to anticipate, and understand focus and priorities.
o Announce to the EOF the emergency classification, plant status, and priorities via the EOF public address system following EOF time-outs.
o Announce to the EOF the emergency classification, plant status, and priorities via the EOF public address system following EOF time-outs.
e Emergency Coordinator or Assistant Emergency Coordinator updates may be broadcast on EOF public address system.
e Emergency Coordinator or Assistant Emergency Coordinator updates may be broadcast on EOF public address system.
* Advise Emergency Coordinator or Assistant Emergency Coordinator of: -All aspects of the emergency situation, including alternate strategies outside of procedures as plant conditions dictate -Emergency Classification changes -Protective Action Recommendations changes -Mitigation strategies  
Advise Emergency Coordinator or Assistant Emergency Coordinator of:  
-Contingency plans.
- All aspects of the emergency situation, including alternate strategies outside of procedures as plant conditions dictate  
Enclosure 6.1 EOF Director/Assistant EOF Ufrector Checklist sRJ01 A/20001003 Page l I of 15 NOTE: 1. l OCFR50.54(x) states that a licensee may take reasonable action that depa11s from a license condition or technical specification in an emergency, when this action is immediately needed to protect the health and safety of the public and no action consistent with license conditions or technical specifications that can provide adequate or equivalent protection is immediately apparent.
- Emergency Classification changes  
Ultimate responsibility for plant response in an emergency resides in the highest authority in the chain of command of the facility licensee available to make a decision about the response.
- Protective Action Recommendations changes  
The on duty OSM should be consulted and his concurrence obtained before invoking I OCFR50.54(x).  
- Mitigation strategies  
- Contingency plans.  
.1 EOF Director/Assistant EOF Ufrector Checklist sRJ01 A/20001003 Page l I of 15 NOTE:
: 1. l OCFR50.54(x) states that a licensee may take reasonable action that depa11s from a license condition or technical specification in an emergency, when this action is immediately needed to protect the health and safety of the public and no action consistent with license conditions or technical specifications that can provide adequate or equivalent protection is immediately apparent. Ultimate responsibility for plant response in an emergency resides in the highest authority in the chain of command of the facility licensee available to make a decision about the response. The on duty OSM should be consulted and his concurrence obtained before invoking I OCFR50.54(x).
: 2. Examples of potential 1 OCFR50.54(x) action items include:  
: 2. Examples of potential 1 OCFR50.54(x) action items include:  
-Deviation from an Emergency Procedure.  
- Deviation from an Emergency Procedure.  
-Rerouting system piping to temporarily restore system flow. -Re-alignment of electrical power systems outside of procedural guidance.  
- Rerouting system piping to temporarily restore system flow.  
-Using mitigation strategies not established by the SAMG guidelines.  
- Re-alignment of electrical power systems outside of procedural guidance.  
: 3. !Ethe TSC is activated.
- Using mitigation strategies not established by the SAMG guidelines.
the TSC Emerge1icy Coordinator makes the decision to invoke 1 OCFR50.54(x).
: 3. !Ethe TSC is activated. the TSC Emerge1icy Coordinator makes the decision to invoke 1 OCFR50.54(x).
o WHEN restoring power in a LOOP event. THEN have the risk significance of power restoration assessed for risk potential by Accident Assessment personnel.
o WHEN restoring power in a LOOP event. THEN have the risk significance of power restoration assessed for risk potential by Accident Assessment personnel.
o Authorize emergency worker extensions if the radiation exposure doses arc expected to exceed the blanket dose extension limits authorized by the Radiation Protection Manager using: -Catawba RP/O/ N5000/018  
o Authorize emergency worker extensions if the radiation exposure doses arc expected to exceed the blanket dose extension limits authorized by the Radiation Protection Manager using:  
-McGuire RP/O/ A/5700/020  
- Catawba RP/O/ N5000/018  
-Oconee RP/O/B/l 000/011.
- McGuire RP/O/ A/5700/020  
- Oconee RP/O/B/l 000/011.
NOTE: The Emergency Action Level descriptions on Line 4 of the Emergency Notification Form have been pre-screened.  
NOTE: The Emergency Action Level descriptions on Line 4 of the Emergency Notification Form have been pre-screened.  
* !Ethe event involves a security tlu*eat, THEN consult the job aid, ''Nuclear Security Approved Messages for Security Related Events/Issues,"
!Ethe event involves a security tlu*eat, THEN consult the job aid, ''Nuclear Security Approved Messages for Security Related Events/Issues," in the EOF Director's notebook for guidance in developing remarks for Line 12 of the Emergency Notification Form.
in the EOF Director's notebook for guidance in developing remarks for Line 12 of the Emergency Notification Form. NOTE: Personnel without badge access will need to be escorted into the EOF by the Assistant EOF Director.
NOTE: Personnel without badge access will need to be escorted into the EOF by the Assistant EOF Director. EOF Emergency Planner, EOF Services Manager, or their Mentor. [61]
EOF Emergency  
Approve personnel with training deficiencies prior to their participation as EOF staff members. This approval shall be documented in the EOF Facility Log.
: Planner, EOF Services  
Document personnel escorted into the EOF in the EOF Facility log.
: Manager, or their Mentor. [61]
Turn over EOF Director duties to the Assistant EOF Director prior to leaving the EOF Director's Area.  
* Approve personnel with training deficiencies prior to their participation as EOF staff members.
.1 EOF Director/ Assistant EOF Director Checklist SR/0/ N2000/003 Page 12of15 o IE necessary to relieve Duke Energy personnel, THEN request environmental surveillance support perso1mel from DOE Radiological Assessment Plan by contacting DOE - Savannah River Site.
This approval shall be documented in the EOF Facility Log.
Periodically review the staffing levels in the EOF to ensure adequate resources are in place lo deal with response/recovery, and direct the EOF Services Manager to coordinate with the appropriate department. agency. or companies.
* Document personnel escorted into the EOF in the EOF Facility log.
. o !E events affect more than one nuclear site, THEN refer to the multi-site event staffing chart in the Oconee Emergency Plan. Figure B-11 o
* Turn over EOF Director duties to the Assistant EOF Director prior to leaving the EOF Director's Area.
IF a beyond design basis external event (BDBEE) or extended loss of AC power (ELAP) event impacts multiple units at a single site, THEN evaluate the need for unit-specific responses (e.g., SAMG, EDMG, FSG, etc.) and unit-specific response teams. {IER L-1-10}
Enclosure 6.1 EOF Director/
NOTE:
Assistant EOF Director Checklist SR/0/ N2000/003 Page 12of15 o IE necessary to relieve Duke Energy personnel, THEN request environmental surveillance support perso1mel from DOE Radiological Assessment Plan by contacting DOE -Savannah River Site.
The job aid, "Questions Corporate Communications may ask (based on initiating event)." is available in the EOF Director's notebook for guidance.
* Periodically review the staffing levels in the EOF to ensure adequate resources are in place lo deal with response/recovery, and direct the EOF Services Manager to coordinate with the appropriate department.
agency. or companies  
. . o !E events affect more than one nuclear site, THEN refer to the multi-site event staffing chart in the Oconee Emergency Plan. Figure B-11 o IF a beyond design basis external event (BDBEE) or extended loss of AC power (ELAP) event impacts multiple units at a single site, THEN evaluate the need for unit-specific responses (e.g., SAMG, EDMG, FSG, etc.) and unit-specific response teams. {IER L-1-10} NOTE: The job aid, "Questions Corporate Communications may ask (based on initiating event)."
is available in the EOF Director's notebook for guidance.
o Provide information to Corporate Communications for news releases.
o Provide information to Corporate Communications for news releases.
o !E EOF needs to be cvncuated.
o !E EOF needs to be cvncuated. THEN refer to EOF Evacuation Checklist in Enclosure 6.22.
THEN refer to EOF Evacuation Checklist in Enclosure 6.22. ____ Verify EOF Emergency Planner completes "EOF 24-Hour Staffing Log" in Enclosure 6.15. -. -***-* IF needed. THEN conduct turnover for on-coming shift. __ Assist TSC Emergency Coordinator or Assistant TSC Emergency Coordinator as a Decision  
____ Verify EOF Emergency Planner completes "EOF 24-Hour Staffing Log" in Enclosure 6.15.  
-. -***-* IF needed. THEN conduct turnover for on-coming shift.
__ Assist TSC Emergency Coordinator or Assistant TSC Emergency Coordinator as a Decision  
. Maker upon entry into Severe Accident Management Guidelines (SAMO). (Catawba and McGuire)
. Maker upon entry into Severe Accident Management Guidelines (SAMO). (Catawba and McGuire)
__ Refer to Enclosure 6.5 (Emergency Classification Downgrade/Tem1ination Criteria) for guidance to downgrade or terminate an emergency event. NOTE: The offsite Recovery Organization will stay at the EOF and work with the counties and states ifradiological conditions exist beyond the site boundary.
__ Refer to Enclosure 6.5 (Emergency Classification Downgrade/Tem1ination Criteria) for guidance to downgrade or terminate an emergency event.
The On-Site Recovery Organization will be established by the Emergency Coordinator.
NOTE:
The offsite Recovery Organization will stay at the EOF and work with the counties and states ifradiological conditions exist beyond the site boundary. The On-Site Recovery Organization will be established by the Emergency Coordinator.
__ IF needed, THEN establish Recovery Organization:
__ IF needed, THEN establish Recovery Organization:
D Catawba RP/O/ NS000/025 D McGuire RP/O/N5700/024 o Oconee RP/O/B/l 000/027 and guidance in Enclosure 6.20.
D Catawba RP/O/ NS000/025 D
Enclosure 6.1 EOF Director/Assistant EOF Director Checklist Terminate the emergency event in accordance with applicable procedure:
McGuire RP/O/N5700/024 o
__ Notification of Unusual Event ci Catawba -RP/O/A/5000/002 o McGuire -RP/O/A/5700/001 o Oconee -Page 14 of this enclosure
Oconee RP/O/B/l 000/027 and guidance in Enclosure 6.20.  
__ Alert
.1 EOF Director/Assistant EOF Director Checklist Terminate the emergency event in accordance with applicable procedure:
* Catawba -RP/O/ A/5000/003 o McGuire -RP/O/A/5700/002 o Oconee -Page 14 of this enclosure
__ Notification of Unusual Event ci Catawba - RP/O/A/5000/002 o
__ Site Arca Emergency o Catawba -RP/O/ A/5000/004 o McGuire-RP/O/A/5700/003 o Oconee -Page 14 of this enclosure
McGuire - RP/O/A/5700/001 o
__ General Emergency o Catawba -RP/O/A/5000/005 o McGuire -RP/O/ A/5700/004.
Oconee - Page 14 of this enclosure
o Oconee -Page 14 of this enclosure SR/0/ A/2000/003 Page 13of15 .... ., ....
__ Alert Catawba - RP/O/ A/5000/003 o McGuire - RP/O/A/5700/002 o
********----*---*
Oconee - Page 14 of this enclosure
NOTE: During declared emergencies, Duke Energy docs not need to meet Fatigue Rule Work Hour Controls.
__ Site Arca Emergency o
Once the declared emergency or the unannounced drill has been terminated, ALL HOlJRS worked during the declared emergency will he included in future work hour calculations, including the determination of minimum breaks between shifts. (69} Announce the following:  
Catawba - RP/O/ A/5000/004 o
McGuire-RP/O/A/5700/003 o
Oconee - Page 14 of this enclosure
__ General Emergency o
Catawba - RP/O/A/5000/005 o
McGuire - RP/O/ A/5700/004.
o Oconee - Page 14 of this enclosure SR/0/ A/2000/003 Page 13of15  
**H*******--~Y *******HH***-****H******----*--&#xa5;&#xa5;*****H*H*----*---*w****H*H*H-----***H*****--*-~~*v*----- ********----*---*
NOTE:
During declared emergencies, Duke Energy docs not need to meet Fatigue Rule Work Hour Controls. Once the declared emergency or the unannounced drill has been terminated, ALL HOlJRS worked during the declared emergency will he included in future work hour calculations, including the determination of minimum breaks between shifts. (69}
Announce the following:  
"Covered Workers need to ensure that all hours worked during an augmentation drill or a declared emergency are entered into EMPCenter prior to leaving the site. Supervisors should consider the need for to initiate a waiver in EMPCenter per AD-SY-ALL-0460, Managing Fatigue and Work Hour Limits."
"Covered Workers need to ensure that all hours worked during an augmentation drill or a declared emergency are entered into EMPCenter prior to leaving the site. Supervisors should consider the need for to initiate a waiver in EMPCenter per AD-SY-ALL-0460, Managing Fatigue and Work Hour Limits."
__ Conduct a critique following tennination of drill or actual event. __ Provide all completed paperwork to Emergency Preparedness following tennination of a drill or actual event.
__ Conduct a critique following tennination of drill or actual event.
Enclosure 6.1 EOF Director/Assistant EOF Director Checklist Close out an Oconee emergency event as listed below: SRJO/ A/2000/003 Page 14of15 __ l.E an event meets termination criteria for General Emergency in Enclosure 6.5, Emergency Classification Downgrade/Tennination, THEN inform NRC Site Team Director (STD) and SDEM that termination criteria have been met.
__ Provide all completed paperwork to Emergency Preparedness following tennination of a drill or actual event.  
* Secure agreement from the two directors to terminate the event.
.1 EOF Director/Assistant EOF Director Checklist Close out an Oconee emergency event as listed below:
* Document names and time decision made below. SDEM NRCSTD Telephone Number 9-1-803-737-8500 (In person in EOF) o Request lead Offsite Agency Communicator to complete Termination Message and transmit it in accordance with SR/O/A/2000/004 (Notification to State and Counties from the Emergency Operations Facility) and terminate the emergency.
SRJO/ A/2000/003 Page 14of15
__ IF terminating from an Unusual Event. Alert, or Site Arca Emergency.
__ l.E an event meets termination criteria for General Emergency in Enclosure 6.5, Emergency Classification Downgrade/Tennination, THEN inform NRC Site Team Director (STD) and SDEM that termination criteria have been met.
THEN o Request lead Offsite Agency Communicator lo complete Termination Message and transmit it in accordnncc with SR/O/ A/2000/004 (Noli Ii cation to State and Counties from the Emergency Operations Facility) and terminate the emergency.
Secure agreement from the two directors to terminate the event.
Document names and time decision made below.
SDEM NRCSTD Telephone Number 9-1-803-737-8500 (In person in EOF) o Request lead Offsite Agency Communicator to complete Termination Message and transmit it in accordance with SR/O/A/2000/004 (Notification to State and Counties from the Emergency Operations Facility) and terminate the emergency.
__ IF terminating from an Unusual Event. Alert, or Site Arca Emergency. THEN o
Request lead Offsite Agency Communicator lo complete Termination Message and transmit it in accordnncc with SR/O/ A/2000/004 (Noli Ii cation to State and Counties from the Emergency Operations Facility) and terminate the emergency.
o Notify the following agencies:
o Notify the following agencies:
SDEM OR. Telephone Number 9-1-803-737-8500 IF the SEOC has not been activated, the County Emergency Management Directors (CEMD) Oconee CDEM _______ _ Pickens CDEM Telephone Number 9-1-864-638-4200 9-1-864-898-5943
SDEM OR.
Telephone Number 9-1-803-737-8500 IF the SEOC has not been activated, the County Emergency Management Directors (CEMD)
Oconee CDEM _______ _
Pickens CDEM ~-~------
Telephone Number 9-1-864-638-4200 9-1-864-898-5943
__ IF terminating from an emergency involving dam failure (Keowee or Jocassee),
__ IF terminating from an emergency involving dam failure (Keowee or Jocassee),
* Discuss tennination with Hydro Central (Refer to Section 6 of the Oconee Emergency Telephone Directory, Keowee Hydro Project Dam/Dike Notification).
Discuss tennination with Hydro Central (Refer to Section 6 of the Oconee Emergency Telephone Directory, Keowee Hydro Project Dam/Dike Notification).
__ Request Oconee Emergency Preparedness to provide a copy of the Licensee Event Report (LER) to state and county agencies at the time it is sent to the NRC.
__ Request Oconee Emergency Preparedness to provide a copy of the Licensee Event Report (LER) to state and county agencies at the time it is sent to the NRC.  
Enclosure 6.1 EOF Director/Assistant EOF Director Checklist  
.1 EOF Director/Assistant EOF Director Checklist  
.Suttiun:  
.Suttiun: (
( ) CNS lMNS )ONS T1m1i*-.*t'r:
) CNS lMNS  
lcfrdc} (Fram}: CiR TSC {TO} TSC EOF Unil{s) Am:<:U.'il; (tirde) IZ Uni1 t llnit;? I Com !'re>> R.-< Ccol Ptess I Ct>lll l'rcss lb: Cool Press ll'xPU\\'C1 I Unit S1atus UmtSt.:ilus Unil St-ltu:;
)ONS T1m1i*-.*t'r: lcfrdc} (Fram}: CiR TSC {TO}
Eqmiuncttt Out nfS.:n:1cc i'>t:i.io!'
TSC EOF Unil{s) Am:<:U.'il; (tirde)
Equipmem 0;1t of Service Nn NJ,\ ERDS Activ;11Cd Yes: E!UJS :\tU\'jlcd Yes Rea.,:on YES NO :-..'OUE Dt.-cl:m:;t m YES NO .*\lt?rt Occfan:.d  
IZ Uni1 t llnit;?
** S,\E DecJ.;ued  
I Com !'re>>
;\l D FlRE OTHER G E Pi,::dared  
R.-< Ccol Ptess I
.:u LAW D
Ct>lll l'rcss lb: Cool Press ll'xPU\\\\'C1 I
u1 Pwgn .. YES NO Field Mor.1tonns Teams Dep1o'.ic:d
Unit S1atus UmtSt.:ilus Unil St-ltu:;  
____ _ WIND SPF.ED _____ WIND DIRECTION  
~b;or Eqmiuncttt Out nfS.:n:1cc i'>t:i.io!' Equipmem 0;1t of Service Nn NJ,\\
------tWFStTE PARS Ret:;;umm:nded YES NO Zoni:sfa*acu<!td
ERDS Activ;11Cd Yes:
_____ , _________
E!UJS :\\tU\\'jlcd Yes Rea.,:on YES NO
Zones Shdtcrc:d  
:-..'OUE Dt.-cl:m:;t m
---------
YES NO  
Kl lle!:ommcnded YES Current Dose lhm Avad;tblc YES NO Have Dose A!Ssc:ss..'l:s Turuo\'c!''
.*\\lt?rt Occfan:.d S,\\E DecJ.;ued ;\\l  
YES Off..Sil4' Cnmruuniutinu:
~!WICAL D FlRE OTHER G E Pi,::dared.:u LAW E~FORCEM8'.'T D
Li.st Mes.<mg:::
Rdc.1s~ u1 Pwgn.. ~s YES NO Field Mor.1tonns Teams Dep1o'.ic:d YESNO~fomhcr ____ _
St:nt ____ Nt...'l;t Due-----(fmlt} !Time} J hixe ("ommonn:n\(}f;;:
WIND SPF.ED _____ WIND DIRECTION ------
dl!i:cm:sd Turnn ... er w11h the ;it'qumng foc1hty Co.'T!mwuc."'tnrs'1 YES NO Tarlrn\*t'r Cmrtph:-tt:
tWFStTE PARS Ret:;;umm:nded YES NO Zoni:sfa*acu<!td _____, _________ Zones Shdtcrc:d ---------
YES NO -TSClEOF Acti\-:ited:lt  
Kl lle!:ommcnded YES Current Dose lhm Avad;tblc YES NO Have Dose A!Ssc:ss..'l:s dis:eus~cd Turuo\\'c!''
-----{drde}
YES Off..Sil4' Cnmruuniutinu: Li.st Mes.<mg::: St:nt ____
Tirnt! ,\ddifiunnl SRJ0 I A/20001003 Page 15of15 Unl13 I R., Cool Temp I D I I D Note: Enclosure 6.2 Catawba Offsitc Protective Actions Protective Action Guides SR/0/ A/2000/003 Page 1of6 Protective Action Recommendations (PARs) for the public apply dming a General Emergency.
Nt...'l;t ~-lcss;age Due-----
and include sheltering, evacuation and consideration of KI use. PARs are based on plant conditions independent of projected dose, and can also be based on projected dose. Protective Action Guides (PAGs) are levels of radiation dose at which prompt protective actions should be initiated and are based on EPA-400-R-92-001, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents.
(fmlt}  
The projected dose PA Rs specified in this enclosure are based on the PAGs listed below. The PAG for Kl is taken from Potassium Iodide as a Thyroid Blocking Agent in Radiation Emergencies.
!Time}
FDA Guidance.
J hixe ("ommonn:n\\(}f;;: dl!i:cm:sd Turnn... er w11h the ;it'qumng foc1hty Co.'T!mwuc."'tnrs'1 YES NO Tarlrn\\*t'r Cmrtph:-tt: YES NO -
November 2001 and Guidance for Industry.
TSClEOF Acti\\-:ited:lt -----
KI in Radiation Emergencies.
{drde}  
Questions and Answers.
!rin:l~J Tirnt!  
FDA. December 2002. f23} PROTECTIVE ACTION GUIDES (PAGs) (Projected Dose or Field Measurements)
,\\ddifiunnl lnlurm~tient:
Total Effective Dose Committed Dose Equivalent (TEDE) Equivalent (CDE) Thyroid _ ........
SRJ0 I A/20001003 Page 15of15 Unl13 I R., Cool Temp I
,. ___
D I
>I Rem >5 Rem ---INITIALS
I D  
_____ PRINTED NAME ___________
 
_
Note:.2 Catawba Offsitc Protective Actions Protective Action Guides SR/0/ A/2000/003 Page 1of6 Protective Action Recommendations (PARs) for the public apply dming a General Emergency. and include sheltering, evacuation and consideration of KI use. PARs are based on plant conditions independent of projected dose, and can also be based on projected dose.
Protective Action Guides (PAGs) are levels of radiation dose at which prompt protective actions should be initiated and are based on EPA-400-R-92-001, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents. The projected dose PA Rs specified in this enclosure are based on the PAGs listed below. The PAG for Kl is taken from Potassium Iodide as a Thyroid Blocking Agent in Radiation Emergencies. FDA Guidance. November 2001 and Guidance for Industry. KI in Radiation Emergencies.
Questions and Answers. FDA. December 2002. f23}
PROTECTIVE ACTION GUIDES (PAGs)
(Projected Dose or Field Measurements)
Total Effective Dose Committed Dose Equivalent (TEDE)
Equivalent (CDE)
Thyroid  
~*----
>I Rem  
>5 Rem INITIALS _____ PRINTED NAME ___________ _
 
GE Has Been Declared (Se.e Norn l)
GE Has Been Declared (Se.e Norn l)
* EVACUATE 2-mileRadius
* EVACUATE 2-mileRadius
* EVACUATE 2-S miles Downwind
* EVACUATE 2-S miles Downwind
* SBELTERS-lOmilesDownwind Recommend the consideration ofKI11seby thepublic Go to Enc. 6.:2, Page 3 of 6 forEXPA.'\i'"DEDPAR Enclosure 6.2 Catawba Offsite Protective Actions Flowchart  
* SBELTERS-lOmilesDownwind Recommend the consideration ofKI11seby thepublic Go to Enc. 6.:2, Page 3 of 6 forEXPA.'\\i'"DEDPAR.2 Catawba Offsite Protective Actions Flowchart - INITIAL PAR SRIO/A/2000/003 Page 2of6 No NOTI 1: For all P..\\Rs, affected Protectin.A.ctionZonesare definedinEnclosure 6.2, Pae.e 4 of 6 NOTE 2:RPSA criteria: Onlyapp!icabletofirnP *.\\R afterGE declaration and the following exist:
-INITIAL PAR SRIO/A/2000/003 Page 2of6 No NOTI 1: For all P . .\Rs, affected Protectin  
LOSS ofContaimnectBanierperRPIO A.15000 OO!{EAL Walli:hnrt)asinclicatedonTableF-1 (FissionProductBarrierThresholdMatri.~).
.A.ctionZonesare definedinEnclosure 6.2, Pae.e 4 of 6 NOTE 2:RPSA criteria:
AleakingorRu"PTURED SG is FALl. TED outside of contilnmea Contairunectiso!auorusrequiredA."""Il EITHER a ContairunenrintegrityhasbeenlostbasedonEmergenc:yCoordinatorjudgmem o u?\\l:SOL.:\\BLE pathway from Ccntammentto theem:irocmect exists Indications ofXCS leakage outside of C ontlmm ent  
Onlyapp!icabletofirnP  
*.\\i'\\1) EITHER:
* .\R afterGE declaration and the following exist: LOSS ofContaimnectBanierperRPIO A.15000 OO!{EAL Walli:hnrt)asinclicatedonTableF-1 AleakingorRu"PTURED SG is FALl. TED outside of contilnmea Contairunectiso!auorusrequiredA."""Il EITHER a ContairunenrintegrityhasbeenlostbasedonEmergenc:yCoordinatorjudgmem o u?\l:SOL.:\BLE pathway from Ccntammentto theem:irocmect exists
l)POTE:NTI.o\\LLOSS oftheContaimnentBanierperRP 0 *.\\.
* Indications ofXCS leakage outside of C ontlmm ent * .\i'\1) EITHER: l)POTE:NTI.o\LLOSS oftheContaimnentBanierperRP 0 * .\. EMF53Aorj3B readingattim e Slflce shutdov.n a c Table F-2) as indicated by C ontainm e:ntRaCiationMonitor Time after SI]} a.IT Potential Loss Ohr-lhr 5500 R1u-lhr-Thr Rbr 2hr tn Shr 1600 R ]t( > Shr 1000 Rhr OR 2) There is a significantradiologicalreleaseproiected to exceedPAGsatthe site bounclazy"ithin anhourasindicated byRP 0 (E.o\L W:illchartRG U ,RG L2 orRG 1-3). Va!idreaclingon 1 2D1F36H effluemraciiauonmoIJitor>
EMF53Aorj3B readingattim e Slflce shutdov.n a c Table F-2) as indicated by C ontainm e:ntRaCiationMonitor Time after SI]}
2.'.! lE-.L c:pm for<:: 15 min. Dose:issessnentusingactualm doses"' 1000 mRem TEDE or5000 mRem CDE at orbeyond the SITE BOUND . ..\RY. Field survevresultsindicate EITHER of followm:<at orbevondthe SrIE BOli!\U.'lli Y: Q ciosedmndowdoserates>
a.IT Potential Loss Ohr-lhr 5500 R1u-lhr-Thr  
min a * .\nalysesoffieldSUC'-*evsamplesmd1carethyro1dCDE  
~000 Rbr 2hr tn Shr 1600 R ]t(  
'i mRem for60min.
> Shr 1000 Rhr OR
of inhalation.  
: 2) There is a significantradiologicalreleaseproiected to exceedPAGsatthe site bounclazy"ithin anhourasindicated byRP 0 A<~OOO.QOl (E.o\\L W:illchartRG U,RG L2 orRG 1-3).
!E RPSA Conditions CA"l:'NOTbe confirm ed. THE&deg;" an ,*er (Se.e Note l)
Va!idreaclingon 1 2D1F36H effluemraciiauonmoIJitor> 2.'.! lE-.L c:pm for<:: 15 min.
Dose:issessnentusingactualm eteorologymd!~ates doses"' 1000 mRem TEDE or5000 mRem ~roid CDE at orbeyond the SITE BOUND...\\RY.
Field survevresultsindicate EITHER of th~ followm:<at orbevondthe SrIE BOli!\\U.'lli Y:
Q ciosedmndowdoserates> 1000mR.t1Jte:;:pectedtoco!lllnuefor~60 min a  
*.\\nalysesoffieldSUC'-*evsamplesmd1carethyro1dCDE  
'i mRem for60min. of inhalation.  
!E RPSA Conditions CA"l:'NOTbe confirm ed. THE&deg;" an,*er (Se.e Note l)
* SfilLTER2-mileRadius
* SfilLTER2-mileRadius
* SHELTER 2-5 miles Downwind 'A,, lt; Recommend the consideration ofICI use by the public ; 1'' (See Note I)
* SHELTER 2-5 miles Downwind  
~B
'A,,
lt; Recommend the consideration ofICI use by the public  
; 1''
(See Note I)
* EVACUATE 2-mileRadius
* EVACUATE 2-mileRadius
* EVACUATE 2-5 miles Downwind  
* EVACUATE 2-5 miles Downwind  
...... *R**
~*1~-...... ~
Enclosure 6.2 Catawba Offsitc Protective Actions Flowchart  
*R**  
-EXPANDED PAR SRJO! A/20001003 Page 3of6 Note l: Forall P
.2 Catawba Offsitc Protective Actions Flowchart - EXPANDED PAR SRJO! A/20001003 Page 3of6 Note l: Forall P *
* affected Proreclive Action Zones (Zones) are defined in Encl();;ure 62., Page 4 of 6. IF a Z:me has heen aceurarely scli::(;red for evacuaEiOll, it shall selecred.
.\\Rs~ affected Proreclive Action Zones (Zones) are defined in Encl();;ure 62., Page 4 of 6.
From Il'i1TIAL PAR Enc.. '6.2, Page 2 of 6 Contiu.11ou.s Assessment Note 2: A short-term release is e that can he aoomi.rely projccffd t-0 h-e < three hours and cootrolled by the liem.<>ee.
IF a Z:me has heen aceurarely scli::(;red for evacuaEiOll, it shall ~
This oonsideratio:n would apply !Do controlled veruing of oontainnteitt Note 3: Plant c.ondmonse.-.:ist which would require the classificalion ofa G:e:nE!al EmEigency pe-r Ute E.t\L:i.
selecred.
111b dac:; NOT include co:n:i:idcmtioo of aff:iim EAL:>. Evnlw.im PAR ba:ied Of!. ch.rui_ge:;
From Il'i1TIAL PAR Enc.. '6.2, Page 2 of 6 Contiu.11ou.s Assessment Note 2: A short-term release is e that can he aoomi.rely projccffd t-0 h-e < three hours and cootrolled by the liem.<>ee. This oonsideratio:n would t:ypica1t~' apply !Do controlled veruing of oontainnteitt Note 3: Plant c.ondmonse.-.:ist which would require the classificalion ofa G:e:nE!al EmEigency pe-r Ute E.t\\L:i. 111b dac:; NOT include co:n:i:idcmtioo of aff:iim aa-~e-bim:.d EAL:>.
m ll.11.yof the follo-..,*i:ng:
Evnlw.im PAR ba:ied Of!. ch.rui_ge:; m ll.11.yof the follo-..,*i:ng:
A Is thi:re a Hostile Aerioin Based f\"*ent in progress'!
A Is thi:re a Hostile Aerioin Based f\\"*ent in progress'!
Yes No (Seel\!ote  
Yes No (Seel\\!ote 1)
: 1)
* SHELTER2:-mile Radius  
* SHELTER2:-mile Radius ** SHELTER2-5 miles Downwind
** SHELTER2-5 miles Downwind
* SHELTER additional Zones that exce00PAGs Is: there a shMt-am m progress?
* SHELTER additional Zones that exce00PAGs  
Yes No
~
* In<:r->...ase in dcm:
Is: there a shMt-am rel~e m progress?
values.
(S~Nvte:?)
in field measurdllent values. Shift in. 15-minure avera?:e  
Yes No In<:r->...ase in dcm: assasroi~tprojecred values.
""ind direclion resuttiue:
In~e in field measurdllent values.
in additional  
Shift in. 15-minure avera?:e ""ind direclion resuttiue: in additional :znnes heing affected.  
:znnes heing affected.
~
* Ter:1ninafam ofac-Eive hosfile aciion against the sire. IF RPSA, when s:afor to do so consider e-.;,.*acua!ion of shelt;;rro zones ha.."-Od upon radiological assessment and llh\;U:::ril11!:;
Ter:1ninafam ofac-Eive hosfile aciion against the sire.
wilh Olliil::
IF RPSA, when s:afor to do so consider e-.;,.*acua!ion of shelt;;rro zones ha.."-Od upon radiological assessment and llh\\;U:::ril11!:; wilh Olliil:: Ai:;:m1..i:::>.  
Ai:;:m1..i:::>.  
/
/  
Couditi~? *  
* -.< .(
~No
Are offsite tfo.se  
.( G(~ee ~orey Are offsite tfo.se proj~tions <lf field
<lf field greatcr th!lll PA Gs? No / Yes (See Note 1)
:mca~=m.-:!lb greatcr th!lll PA Gs?
No  
/
Yes (See Note 1)
* EVACUATE 2-mife Radius
* EVACUATE 2-mife Radius
* EVA<CUATE 2-5 miles Downwind  
* EVA<CUATE 2-5 miles Downwind Yes EVACUATE Zones that exoeee<f  
'" Yes EVACUATE Zones that exoeee<f  
?AGs. !f projected dose or field measurements 2: 5 rem CDE Th1yroid then recommend the  
?AGs. !f projected dose or field measurements 2: 5 rem CDE Th1yroid then recommend the .. ()l};Mideration of Kl us:e by the pwt>!ic.
.. ()l};Mideration of Kl us:e by the pwt>!ic.  
INITIAL Enclosure 6.2 Catawba Offsite Protective Actions SR/0/ A/2000/003 Page 4of6 CAUTION:
 
INITIAL.2 Catawba Offsite Protective Actions SR/0/ A/2000/003 Page 4of6 CAUTION:
A short term release is any release that can be projected to be 3 hours or less in duration.
A short term release is any release that can be projected to be 3 hours or less in duration.
An example would be a "puff release".
An example would be a "puff release". A controlled release is one that can be stmted and.
A controlled release is one that can be stmted and. stopped at the licensee's discretion, such as the venting of Containment for pressure control.  
stopped at the licensee's discretion, such as the venting of Containment for pressure control. !Ea release is short term AND controlled, sheltering in lieu of evacuation should be considered. {36}
!Ea release is short term AND controlled, sheltering in lieu of evacuation should be considered.  
NOTE:
{36} NOTE: 1. If necessary, obtain needed data from one of the following sources in order of sequence:
: 1. If necessary, obtain needed data from one of the following sources in order of sequence:
A. Catawba SOS (Group Display "EMF") B. Duke Energy Meteorologist (2-0139.
A. Catawba SOS (Group Display "EMF")
3-7896, OR 2-4316) C. National Weather Service in Greer, S.C. (9-1-864-879-1085, 9-1-800-268-7785  
B. Duke Energy Meteorologist (2-0139. 3-7896, OR 2-4316)
: 2. OAC/SDS wind direction can be displayed as greater than 360 degrees.
C. National Weather Service in Greer, S.C. (9-1-864-879-1085, 9-1-800-268-7785
To arrive a! wind direction for table below. subtract 360 from wind direction indications greater than 360 degrees.
: 2. OAC/SDS wind direction can be displayed as greater than 360 degrees. To arrive a! wind direction for table below. subtract 360 from wind direction indications greater than 360 degrees.
IF AT ANY TIME a General Emergency is declared.
IF AT ANY TIME a General Emergency is declared. TH$N make immediate PROTECTIVE ACTION RECOMMENDATIONS (PARs) within 15 minutes to be entered on Linc 6 of the Emergency Notification Form (EN F). Dete1111ine the PA Rs based on the 15-minute c:iverage upper wind direction (OAC point CI P0250) as below:
TH$N make immediate PROTECTIVE ACTION RECOMMENDATIONS (PARs) within 15 minutes to be entered on Linc 6 of the Emergency Notification Form (EN F). Dete1111ine the PA Rs based on the 15-minute c:iverage upper wind direction (OAC point CI P0250) as below: Protective Action Zones Wind Direction 2-Mile Radius 2-S Miles Downwind 5-10 Miles Downwind (RPSA Only) 348.75 -11.25 AO Bl.Cl.DI B2,C2,D2 11.26 -33.75 AO Cl, DI C2,D2 33.76 -56.25 AO Cl, DI, El C2, D2, E2 56.26 -78.75 AO Cl, DI, El, Fl C2, D2, E2, F2 78.76 -101.25 AO Cl, DI, El, Fl 02, E2, F2 101.26-123.75 AO DI, El, Fl D2, E2, F2, F3 123.76 -146.25 AO El, Fl E2, F2,F3 146.26-168.75 AO Al, El, Fl A2, E2, F2, F3 168.76 -191.25 AO Al, El, Fl A2, F2, F3 191.26-213.75 AO Al, Bl,EI, Fl A2, A3. 82, F2, F3 213.76 -236.25 AO Al, Bl, Fl A2, A3, 82, F2, F3 236.26 -258.75 AO Al, Bl, Fl A2, A3, 82, F3 258.76 -281.25 AO Al,81,CI A2, A3, 82, C2 281.26-303.75 AO Al, 81,CI A2, A3, 82, C2 303.76 -326.25 AO Bl, Cl A3, 82, C2 326.26 -348.74 AO Bl, Cl, DI B2,C2,D2 Enclosure 6.2 Catawba Offsitc Protective Actions sRJ01 A/20001003 Page 5of6 NOTE: !E changes to the initial Protective Action Recommendations are recommended, THEN these changes must be transmitted to the offsite agencies within 15 minutes.
Protective Action Zones Wind Direction 2-Mile Radius 2-S Miles Downwind 5-10 Miles Downwind (RPSA Only) 348.75 - 11.25 AO Bl.Cl.DI B2,C2,D2 11.26 - 33.75 AO Cl, DI C2,D2 33.76 - 56.25 AO Cl, DI, El C2, D2, E2 56.26 - 78.75 AO Cl, DI, El, Fl C2, D2, E2, F2 78.76 - 101.25 AO Cl, DI, El, Fl 02, E2, F2 101.26-123.75 AO DI, El, Fl D2, E2, F2, F3 123.76 - 146.25 AO El, Fl E2, F2,F3 146.26-168.75 AO Al, El, Fl A2, E2, F2, F3 168.76 - 191.25 AO Al, El, Fl A2, F2, F3 191.26-213.75 AO Al, Bl,EI, Fl A2, A3. 82, F2, F3 213.76 -236.25 AO Al, Bl, Fl A2, A3, 82, F2, F3 236.26 - 258.75 AO Al, Bl, Fl A2, A3, 82, F3 258.76 - 281.25 AO Al,81,CI A2, A3, 82, C2 281.26-303.75 AO Al, 81,CI A2, A3, 82, C2 303.76 - 326.25 AO Bl, Cl A3, 82, C2 326.26 - 348.74 AO Bl, Cl, DI B2,C2,D2  
.2 Catawba Offsitc Protective Actions sRJ01 A/20001003 Page 5of6 NOTE:  
!E changes to the initial Protective Action Recommendations are recommended, THEN these changes must be transmitted to the offsite agencies within 15 minutes.
CAUTION:
CAUTION:
IE a zone has been accurately selected for evacuation, THEN it shall remain selected.
IE a zone has been accurately selected for evacuation, THEN it shall remain selected.
__ IF dose projections indicate that COE Thyroid dose will be 2: 5 Rem, Tl*lli:N recommend KI use by the General Public in accordance with State Plans and Policy. {23} Evaluate specific plant conditions, offsite dose projections, wind direction, field monitoring team dala, and assess the need to update Protective Action Recommendations made to the states and counties in the previous notification throughout the event. Review dose projections with the Radiological Assessment Mmrnger to determine if Protective Action Recommendations are required beyond the I 0-mile EPZ. !E Protective Action Recommendations are required beyond I 0 miles. THEN notify states and counties to consider sheltering/evacuating general population located beyond the affected I 0-mile EPZ. '*
__ IF dose projections indicate that COE Thyroid dose will be 2: 5 Rem, Tl*lli:N recommend KI use by the General Public in accordance with State Plans and Policy. {23}
Gastooeo.
Evaluate specific plant conditions, offsite dose projections, wind direction, field monitoring team dala, and assess the need to update Protective Action Recommendations made to the states and counties in the previous notification throughout the event.
Enclosure 6.2 Catawba Offsite Protective Actions Catawba Protective Action Zones mile EPZ (2 and 5-mile Radius, inner circles) 0 2 4 6 Mies ,. SRJ01 A/20001003 Page 6of6 i "
Review dose projections with the Radiological Assessment Mmrnger to determine if Protective Action Recommendations are required beyond the I 0-mile EPZ.  
Note: Enclosure 6.3 McGuire OffsUe Pl'ot'ective Actions Protective Action Guides SR/0/ A/2000/003 Page 1of6 Protective Action Recommendations (PARs) for the public apply during a General Emergency, and include sheltering, evacuation and consideration of KI use. PARs are based on plant conditions independent of projected dose, and can also be based on projected close. Protective Action Guides (PAGs) are levels of radiation dose at which prompt protective actions should be initiated and are based on EPA-400-R-92-00 I, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents.
!E Protective Action Recommendations are required beyond I 0 miles. THEN notify states and counties to consider sheltering/evacuating general population located beyond the affected I 0-mile EPZ.  
The projected dose PARs specified in this enclosure are based on the PAGs listed below. The PAG for KI is taken from Potassium Iodide as a Thvroid Blocking Agent in Radiation Emergencies.
 
FDA Guidance, November 2001 and Guidance fotJndustry.
Gastooeo..2 Catawba Offsite Protective Actions Catawba Protective Action Zones mile EPZ (2 and 5-mile Radius, inner circles) 0 2
Kl in Radiation Emergencies.
4 6 Mies  
Questions and Answers.
--~-*,*--**
FDA, December 2002. (23} *--PROTECTIVE ACTION GUIDES (PAGs) __
r.~. ~~-
Dose or Field Total Effective Dose Committed Dose Equivalent (TEDE) Equivalent (CDE) Thyroid ?::,.1 Rem ?::,.5 Rem ..  
SRJ01 A/20001003 Page 6of6 i "  
----INITIALS
 
___ _ PRINTED NAME ___________
Note:.3 McGuire OffsUe Pl'ot'ective Actions Protective Action Guides SR/0/ A/2000/003 Page 1of6 Protective Action Recommendations (PARs) for the public apply during a General Emergency, and include sheltering, evacuation and consideration of KI use. PARs are based on plant conditions independent of projected dose, and can also be based on projected close. Protective Action Guides (PAGs) are levels of radiation dose at which prompt protective actions should be initiated and are based on EPA-400-R-92-00 I, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents. The projected dose PARs specified in this enclosure are based on the PAGs listed below. The PAG for KI is taken from Potassium Iodide as a Thvroid Blocking Agent in Radiation Emergencies. FDA Guidance, November 2001 and Guidance fotJndustry. Kl in Radiation Emergencies. Questions and Answers. FDA, December 2002. (23}
_
PROTECTIVE ACTION GUIDES (PAGs)
Enclosure 6.3 McGuire Offsite Protective Actions Flowchart  
JJ?_~jected Dose or Field Measure1~_1ents)
-INITLl\.L PAR SR/0/ A/2000/003 Page 2of6 GE Has Been Declared (See Notel) ., EVAC:UATE.
Total Effective Dose Committed Dose Equivalent (TEDE)
2-mile Radius
Equivalent (CDE)
Thyroid  
?::,.1 Rem  
?::,.5 Rem H&#xa5;~.. *~--*-*
INITIALS ___
PRINTED NAME ___________ _  
.3 McGuire Offsite Protective Actions Flowchart - INITLl\\.L PAR SR/0/ A/2000/003 Page 2of6 GE Has Been Declared (See Notel)  
., EVAC:UATE. 2-mile Radius
* EVACUATE 2.-5 mile:; Downwind
* EVACUATE 2.-5 mile:; Downwind
* SHELTER.5-10 miles Downwind Recommend the consideration of Kl use by the public. Goto Enc:.6.3,PageJ of6 forEXPAJ\il)EDPAR No ''tp" !
* SHELTER.5-10 miles Downwind Recommend the consideration of Kl use by the public.
Note 1: For all PAR.s, aff e:ted Prote:tive Action Zone; (Zones) are defined in Enclosure 6.3. Page 4 of 6. Note 2: Off site z.gencies have provided prior knowledge of off site i:npediments to evacuation (such as flc-O<iing, bridge/road  
Goto Enc:.6.3,PageJ of6 forEXPAJ\\il)EDPAR No  
: closures, adverse weath;;r.
~Q
traffic control not in place, etc.) Al'\"D specifically requested that the site :."OT issue an evacnation PAR. Nott: 3: RPSA Only Applicable to fa;t ?AR after GE Decla:ation Al"\l) t\vo af thefollowhg exist from EAL Wdlchart (IF RPSA conditions can !\OT be cocl'hmed, Tl1IN ans\ver NO): L LOSS of Prim<?L)'
''tp" !
Barrier ft!!' Table F1 {Fission Product Barrier Threshold Matri."{).
(~~*,;
Al'i"'D '.!. POTEl'.fIIAL LOSS of Containment Barr'.er per Coat2inment Radiation Monitor EMF51A er E:MF51B per Table F'.l (Conhiinment Rc.diativnR1!!!:EME'  
Note 1: For all PAR.s, aff e:ted Prote:tive Action Zone; (Zones) are defined in Enclosure 6.3. Page 4 of 6.
:5 lA&B). QR There is asignificam radiological rdease p:ojected to exceed RG l EA.L at ilie site boundary within an hour, Yes (See Note I)
Note 2: Off site z.gencies have provided prior knowledge of off site i:npediments to evacuation (such as flc-O<iing, bridge/road closures, adverse weath;;r. traffic control not in place, etc.) Al'\\"D specifically requested that the site :."OT issue an evacnation PAR.
Nott: 3: RPSA criteri~ Only Applicable to fa;t ?AR after GE Decla:ation Al"\\l) t\\vo af thefollowhg exist from EAL Wdlchart (IF RPSA conditions can !\\OT be cocl'hmed, Tl1IN ans\\ver NO):
L LOSS of Prim<?L)' C:m:ai:im~t Barrier ft!!' Table F1 {Fission Product Barrier Threshold Matri."{).
Al'i"'D  
'.!. POTEl'.fIIAL LOSS of Containment Barr'.er per Coat2inment Radiation Monitor EMF51A er E:MF51B per Table F'.l (Conhiinment Rc.diativnR1!!!:EME' :5 lA&B).
QR There is asignificam radiological rdease p:ojected to exceed RG l EA.L at ilie site boundary within an hour, Yes (See Note I)
* SHELTER2-mile Radius o SHELTER2-5 miles Downwind  
* SHELTER2-mile Radius o SHELTER2-5 miles Downwind  
.,'If,: A. !:jR*' Yes Recommend the consideration cfl<I use by the public. ! .. ._ . . (See Note i: o EVACUA1E 2-mile Radius
.,'If,:
* EVACUATE Z.-5 miles Downwind iP.j ' *. * 'IC <. **A1 ;
A.  
A Enclosure 6.3 -McGuire Offsite Protective Actions Flowchart  
!:jR*'
-EXP ANDED PAR sRJO / A120001003 Page 3of6 Nate l: FiJr al.1 PARs.
Yes Recommend the consideration cfl<I use by the public.
Protactivi:!
r~o
Actioo.Zon=s (Zones );u-e in Encl0$:r.=  
~
'6 3, P&#xa3;._g:-:
(See Note i:
4 of6. IF ;a Zone b>!Ell for a;,;acu:aticn...
o EVACUA1E 2-mile Radius
th'21l.itshall remain se1,:ct.;:d.
* EVACUATE Z.-5 miles Downwind iP.j  
Note 2*: Omitaaioaiicie;i hz.,,._.,
' *. * 'IC  
priork:oow1'3!iga ofoffiitaimpm:i:m::n13 to e*."2cm.ticn  
**A1  
{such as fkiooing,  
;ij~
.b:ridga.lroad w.aatl:er, tr.I.me coo.trol not in puca, ate.) .t'\"D thatthesie NOT issua an Note3: A short-'t:im rei'il?Se is OOE: th:at=b.;;,
:;~;:1 A
2=tE1y to be< three hour. md co:nlrcll.:C hv tha license=.  
:[~\\:
'Thill consideralio:n v;omd typically  
~o
;applyto rontrclled ventin::
.3 -
ofca:nt:2iru:nant.
McGuire Offsite Protective Actions Flowchart - EXP ANDED PAR sRJO / A120001003 Page 3of6 Nate l: FiJr al.1 PARs. afi~ Protactivi:! Actioo.Zon=s (Zones );u-e ~..fuiai in Encl0$:r.= '6 3, P&#xa3;._g:-: 4 of6.
Nate4: Plant comlliimuexi-stwhie:h....-out&
IF ;a Zone ha~ b>!Ell.;acematalvsel~:d for a;,;acu:aticn... th'21l.itshall remain se1,:ct.;:d.
reqi;U-a Em=rg:i:i::yi:r=r the Bl.Ls. 'This doos NOT inclooeeomida!atim ofoffiit::aosH:as:i offiie to e-v-ac.u:atin:n?  
Note 2*: Omitaaioaiicie;i hz.,,._., pro*-i~ priork:oow1'3!iga ofoffiitaimpm:i:m::n13 to e*."2cm.ticn
{such as fkiooing,.b:ridga.lroad clo=~,ad -~~ w.aatl:er, tr.I.me coo.trol not in puca, ate.).t'\\"D s~:cificaUyr.:qis2st-e-G thatthesie NOT issua an a'i.~tioo P.~..R.
Note3: A short-'t:im rei'il?Se is OOE: th:at=b.;;, 2=tE1y proj~Ed to be< three hour. md co:nlrcll.:C hv tha license=. 'Thill consideralio:n v;omd typically ;applyto rontrclled ventin:: ofca:nt:2iru:nant.
Nate4: Plant comlliimuexi-stwhie:h....-out& reqi;U-a thecbssi~cationofa G'.!n~I Em=rg:i:i::yi:r=r the Bl.Ls. 'This doos NOT inclooeeomida!atim ofoffiit::aosH:as:i E..~s.
offiie imp~im::nt to e-v-ac.u:atin:n?
(Sc:No*tel)
(Sc:No*tel)
Y.:s (See Motel) " SHELTER:2-mileRadiu:s  
Y.:s (See Motel)  
[See f*Iate From.INITBL PAR Enc. 6.3,Page:1 of6 Co.ntimmus As..essment E
" SHELTER:2-mileRadiu:s
PAR baz:i onckIDg'=S  
[See f*Iate 1~
:Ui atty of th: foll&deg;""io,g:
From.INITBL PAR Enc. 6.3,Page:1 of6 Co.ntimmus As..essment E valu.a~ PAR baz:i onckIDg'=S :Ui atty of th: foll&deg;""io,g:
* fua-.::-.sa  
fua-.::-.sa :Ui dcs2.a;ses:SilE:Ol:pt"qji::et-:!t *r.llue;:.
:Ui dcs2 .a;ses:SilE:Ol:pt"qji::et-:!t  
fucrezse:Ui fieldma;sll!"emmt>-21.u.;,s.
*r.llue;:.
Shift in 15-:in.i!mt::zv~e v.-in6 di:ecticnras'!>lti:agin  
* fucrezse:Ui fieldma;sll!"emmt>-21.u.;,s.
.;add:itiCiJ21 ZOO!::S bei:ng zff-=ct.;:d.
* Shift in v.-in6 di:ecticnras'!>lti:agin  
Offait:: agencies :infoan th: $it:t:lutoffiite im~
.;add:itiCiJ21 ZOO!::S bei:ng zff-=ct.;:d.  
no 1m:iger.::xis t T~onofai:cti**e ha;til.;;::a;::timi.~ttb.:.sit::
" *
* IF R=.
* Offait::
h  
agencies  
~
:infoan th: $it:t:lutoffiite no 1m:iger .::xis t
... b.Ji.fi; it;
* IF R= . h *-* '** . ... b.Ji.fi; it;  
:::n_s::.!"=:*toao-ro;om1.~e"-::a.<:t:.-.ati.cno"E:,.
,. sh=1.t:r:e zones o;a;;e upcnn41tcl.og:ical as-o-5smeol:200-ci3*::i;sst<l:l.S with 0&#xa3;fcite omit: dose proj:etions or field m;:a$ ur.:m=ot3 gre;at:r t1un No
sh=1.t:r:e zones o;a;;e upcnn41tcl.og:ical as-o-5smeol:200-ci3*::i;sst<l:l.S with 0&#xa3;fcite Agenci~.
-~...!''!!: omit: dose proj:etions or field m;:a$ ur.:m=ot3 gre;at:r t1un No
* SHELTfR 2-5 miles D<lwnu1rnd
* SHELTfR 2-5 miles D<lwnu1rnd
* EVA'CUATE2-mHelladJ!!.S  
* EVA'CUATE2-mHelladJ!!.S  
'EVACUATEZ<tn:esthat:'l!!Xceed PA&#xa3;s. lf;projei::teddo.searfiefd mEiliSurements 5 re:mCD:E Thy.mid then :r.ei:-ommend the public.
'EVACUATEZ<tn:esthat:'l!!Xceed PA&#xa3;s. lf;projei::teddo.searfiefd mEiliSurements ~ 5 re:mCD:E Thy.mid then :r.ei:-ommend the i:ansideraticmcf!Klmehythe-public.
* SHEi!. TER addit:iCJmiJ Zones that excee<!PA<:is
* SHEi!. TER addit:iCJmiJ Zones that excee<!PA<:is
* CVACUA1'E2-5 miles Dilt<mwimf INITIAL Endosurc 63 McGuire Offsite Protective Actions sRJO! tV20001003 Page 4of6 ....--------
* CVACUA1'E2-5 miles Dilt<mwimf  
-*-----------------------..
 
CAUTION:
INITIAL Endosurc 63 McGuire Offsite Protective Actions sRJO! tV20001003 Page 4of6 CAUTION:
A short release is any rdeas*. Lhat can be projected to be 3 hours or less in duration.
A short *.~rm release is any rdeas*. Lhat can be projected to be 3 hours or less in duration.
An exa: ,ple would be a "puff rek .. se11* A controlled release is one that can be started and stopped :l the licensee's discretio1  
An exa:,ple would be a "puff rek.. se 11
*. such as the venting of Containment for pressure control.
* A controlled release is one that can be started and stopped :l the licensee's discretio1 *. such as the venting of Containment for pressure control. _IF a release is short term AND controlled, THEN sheltering in lieu of evacuation should! :: considered. {36}  
_IF a release is short term AND controlled, THEN sheltering in lieu of evacuation should! :: considered.  
...,.,.---=---=-=---- --------****------------------------.
{36} ...,.,.---=---=-=----
NOTE:{S} Jfnecessar obtain needed data fro1r,111e of the following sources in order of sequence:
--------****------------------------.
A. McGu  
NOTE:{S}
*~ SDS (Group Display 11  
Jfnecessar obtain needed data fro1r ,111e of the following sources in order of sequence:
\\.tJ.F")
A. McGu SDS (Group Display 11 \.tJ.F")
B. Duke* -iergy Meteorologist (2-C'; 39, 3-7896. OR 2-4316)
B. Duke* -iergy Meteorologist (2-C'; 39, 3-7896. OR 2-4316) C. Natio1.,,\
C.
Weather Service in Gri.'.:r, S.C. (9-l-864-879-1085, 9-1-800-268-7785 IF AT ANY T1 -:1.E a General Emergency is declared, THEN make immediate PROTECTIVE ACTION REC! \!JMENDATIONS (PARs) within 15 minutes to be entered on Linttofthe Emergency Not* ii cation Form (ENF). Determine the PARs based on the 15-minute average upper wind direction  
Natio1.,,\\ Weather Service in Gri.'.:r, S.C. (9-l-864-879-1085, 9-1-800-268-7785 IF AT ANY T1 -:1.E a General Emergency is declared, THEN make immediate PROTECTIVE ACTION REC! \\!JMENDATIONS (PARs) within 15 minutes to be entered on Linttofthe Emergency Not* ii cation Form (ENF). Determine the PARs based on the 15-minute average upper wind direction ( U\\C point Ml P0847) as below:
( U\C point Ml P0847) as below: -...... Protective Action Zones Wind Direction 2-Mile Radius 2-5 Miles Downwind 5-10 Miles Downwind (RPSA Only) 0.1 -22.5 l):-C.L.M D,O,R E,F,S 22.6-45.0 1:12;,L,M D,O,R E,Q,S 45.l -67.5 1".:'.',L,M D,N,O,R E,P,Q,S 67.6-90.0 LC,L,M D,N,O,R P,Q,S 90.1 -112.5 H,C,L,M N,O,R K,P,Q,S 112.6-135.0  
Protective Action Zones Wind Direction 2-Mile Radius 2-5 Miles Downwind 5-10 Miles Downwind (RPSA Only)  
!3,C,L,M A,N,O,R I,K,P,Q,S 135.1 -157.5 B,C,L,M A,N,O l,K,P,Q 157.6 -180.0 B,C,L,M A,N H,l,J,K,P*
.~
180. 1 -202.5 B,C,L,M A,N G,H,l,J,K,P 202.6 -225.0 r?.:C,L,M A,D,N G,H,l,J,K,P 225.1 -247.5 [\.C,L,M A,D F,G,H,l,.J 247.6 -270.0 B .. '.:',L,M A,D F,G,H,I,J 270. I -292.5 A,D E,F,G,H,.J 292.6 -315.0 B,C,L,M A,D,R E,F,G 315.1-337.5 B,C,L,M D,R E,F,G,S 337.6 -360.0 r,,c,L,M D,R,O E,F,S NOTE: ICnclosure  
0.1 -22.5 l):-C.L.M D,O,R E,F,S 22.6-45.0 1:
().3 McGuire Offsite Protective Actions SR/0/ A/2000/003 Page 5of6 IF changes to the initial Protective Action Recommendations are recommended, THEN these changes must be transmitted to the offsite agencies within 15 minutes.
1 2;,L,M D,O,R E,Q,S 45.l - 67.5 1".:'.',L,M D,N,O,R E,P,Q,S 67.6-90.0 LC,L,M D,N,O,R P,Q,S 90.1 -112.5 H,C,L,M N,O,R K,P,Q,S 112.6-135.0  
!3,C,L,M A,N,O,R I,K,P,Q,S 135.1 - 157.5 B,C,L,M A,N,O l,K,P,Q 157.6 - 180.0 B,C,L,M A,N H,l,J,K,P*
180. 1 - 202.5 B,C,L,M A,N G,H,l,J,K,P 202.6 - 225.0 r?.:C,L,M A,D,N G,H,l,J,K,P 225.1 - 247.5
[\\.C,L,M A,D F,G,H,l,.J 247.6 - 270.0 B.. '.:',L,M A,D F,G,H,I,J 270. I - 292.5 f}:~-*,L,M A,D E,F,G,H,.J 292.6 - 315.0 B,C,L,M A,D,R E,F,G 315.1-337.5 B,C,L,M D,R E,F,G,S 337.6 - 360.0 r,,c,L,M D,R,O E,F,S  
 
NOTE:
ICnclosure ().3 McGuire Offsite Protective Actions SR/0/ A/2000/003 Page 5of6 IF changes to the initial Protective Action Recommendations are recommended, THEN these changes must be transmitted to the offsite agencies within 15 minutes.
CAUTION:  
CAUTION:  
!Ea zone has been accurately selected for evacuation, THEN it shall remain selected.
!Ea zone has been accurately selected for evacuation, THEN it shall remain selected.
__ IF dose projections indicate that COE Thyroid dose will 5 Rem. Tflli:N recommend KI use by the General Public in accordance with State Plans and Policy. {23} Evaluate specific plant conditions, offsite dose wind direction, field monitoring team data, and assess the need to update Protective Action Recommendations made to the states and counties in the previous notification throughout the event. Review dose projections with the Radiological Assessment Manager to determine if Protective Action Recommendations are required beyond the l 0-mile EPZ. IF Protective Action Recommendations are required beyond I 0 miles. THEN notify stales and counties to consider sheltering/evacuating general population located beyond the affected l 0-milc EPZ.
__ IF dose projections indicate that COE Thyroid dose will be~: 5 Rem. Tflli:N recommend KI use by the General Public in accordance with State Plans and Policy. {23}
Enclosure 6.3 McGuire Offsite Protective Actions SR/01 A/2000/003 Page 6of6 McGuire Protective Action Zones -I 0-mile EPZ (2 and 5-mile inner circles) o" N l Note: INITIALS Enclosure 6.4 Oconee Offsite Protective Actions Protective Action Guides SR/0/ A/2000/003 Page 1 of 7 Protective Action Reconu11endations (PARs) for the public apply during a General Emergency, and include sheltering, evacuation and consideration of KI use. PARs are based on plant conditions independent of projected dose, and can also be based on projected dose. Protective Action Guides (PAGs) are levels of radiation dose at which prompt protective actions should be initiated and are based on EPA-400-RM92-00 I, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents.
Evaluate specific plant conditions, offsite dose projections~ wind direction, field monitoring team data, and assess the need to update Protective Action Recommendations made to the states and counties in the previous notification throughout the event.
The projected dose PARs specified in this enclosure are based on the PAGs listed below. The PAG for KI is taken from Potassium Iodide as a Thyroid Blocking A11:ent in Radiation Emergencies.
Review dose projections with the Radiological Assessment Manager to determine if Protective Action Recommendations are required beyond the l 0-mile EPZ.
FDA Guidance.
IF Protective Action Recommendations are required beyond I 0 miles. THEN notify stales and counties to consider sheltering/evacuating general population located beyond the affected l 0-milc EPZ.  
November 2001 and Guidance for Industry.
.3 McGuire Offsite Protective Actions SR/01 A/2000/003 Page 6of6 McGuire Protective Action Zones - I 0-mile EPZ (2 and 5-mile radius~ inner circles) o" N
KI in Radiation Emergencies.
l  
Questions and Answers.
 
FDA, December 2002. (23}
Note:
PROTECTIVE ACTION GUIDES (PAGs) __ .!E._&#xa3;ojected Dose Field  
INITIALS.4 Oconee Offsite Protective Actions Protective Action Guides SR/0/ A/2000/003 Page 1 of 7 Protective Action Reconu11endations (PARs) for the public apply during a General Emergency, and include sheltering, evacuation and consideration of KI use. PARs are based on plant conditions independent of projected dose, and can also be based on projected dose. Protective Action Guides (PAGs) are levels of radiation dose at which prompt protective actions should be initiated and are based on EPA-400-RM92-00 I, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents. The projected dose PARs specified in this enclosure are based on the PAGs listed below. The PAG for KI is taken from Potassium Iodide as a Thyroid Blocking A11:ent in Radiation Emergencies. FDA Guidance. November 2001 and Guidance for Industry. KI in Radiation Emergencies. Questions and Answers. FDA, December 2002. (23}  
--i Total Effective Dose Committed Dose Equivalent (TEDE) Equivalent (COE) Thyroid -----PRINTED NAME ___________
~-----~~--~-~~~~-~
_
PROTECTIVE ACTION GUIDES (PAGs)
Enclosure 6.4 Oconee Offsite Protective Actions Flowchart  
__.!E._&#xa3;ojected Dose ~T. Field Measure1~1_e_nt_s"'"") --i Total Effective Dose Committed Dose Equivalent (TEDE)
-INITIAL PAR SR/0/ A/2000/003 Page 2 of7 GE Has Been Declared Is this a llil.pidly Progressing Severe Accident (RPSA) (See l\'ote 3) (See Note I)
Equivalent (COE)
Thyroid PRINTED NAME ___________ _  
.4 Oconee Offsite Protective Actions Flowchart - INITIAL PAR SR/0/ A/2000/003 Page 2 of7 GE Has Been Declared Is this a llil.pidly Progressing Severe Accident (RPSA)
(See l\\'ote 3)
(See Note I)
* EVACUATE2-mileRadius
* EVACUATE2-mileRadius
* EVACUATE2-5 milesOovmwind
* EVACUATE2-5 milesOovmwind
* SHELTER 5-10 miles Downwind Are offsite dose projections or field measurements:'.::
* SHELTER 5-10 miles Downwind Are offsite dose projections or field measurements:'.:: 5 rem CDE Thyroid?
5 rem CDE Thyroid?
Yes Recommend the consideration of Kl use by the public.
Yes Recommend the consideration of Kl use by the public. Go to Eoc. 6.4, Page3 of 7 for EXP_-\1,"])ED PAR No No Note I: For all PAR.s, affected Protective Action Zones (PA.Zs) are defined in Enclosure 6.4, Page 5 of 7. Note2: Offsite agencies ha\*e prm*ided prior kno\\1edge of offsite impediments to erncuation (such as flooding, bridge!ro ad closures, etc.) k'-.:1) specifically requested that the site NOT issue an evacuation PAR. Note3: RPSAcriteria:
Go to Eoc. 6.4, Page3 of 7 for EXP_-\\1,"])ED PAR No No Note I: For all PAR.s, affected Protective Action Zones (PA.Zs) are defined in Enclosure 6.4, Page 5 of 7.
Note2: Offsite agencies ha\\*e prm*ided prior kno\\\\1edge of offsite impediments to erncuation (such as flooding, bridge!ro ad closures, etc.) k'-.:1) specifically requested that the site NOT issue an evacuation PAR.
Note3: RPSAcriteria:
First PAR.after GE Declaration
First PAR.after GE Declaration
_-\1,1) LOSSofContainmentBarrierperRP!OiA!lOOOJOOl,Enclosure4.L Al' ill ;;--containment Radiation  
_-\\1,1)
:vfon.itor RL.l-57 or RLl\.SS reading e..,;ceeds Cont2inment Barrier POTEi\"TL-U..
LOSSofContainmentBarrierperRP!OiA!lOOOJOOl,Enclosure4.L Al' ill  
LOSS,EAL thresholdperRP!O/A!l000/001,Endosure4.L OR o Radiologic21 release such that doses are projected to exceedEPAPAGs atthe site boundary within an hour(EAL4.3.G.1)  
;;--containment Radiation :vfon.itor RL.l-57 or RLl\\.SS reading e..,;ceeds Cont2inment Barrier POTEi\\"TL-U..
(!;IRPSA conditions can NOT be confirmed, THEN answer NO). Is there a Hostile Action Based event in progress?
LOSS,EAL thresholdperRP!O/A!l000/001,Endosure4.L OR o
Yes No (See Note I) . ffF, SHELTER 2-mile Radius . :A.*;.;
Radiologic21 release such that doses are projected to exceedEPAPAGs atthe site boundary within an hour(EAL4.3.G.1)
* SHELTER 2-5 miles Downwind  
(!;IRPSA conditions can NOT be confirmed, THEN answer NO).
:*.R. r1 Is there a known offsite impediment No (See?\otel)
Is there a Hostile Action Based event in progress?
Yes No (See Note I)  
. ffF, SHELTER 2-mile Radius  
. :A.*;.;
* SHELTER 2-5 miles Downwind
:*.R. r1 Is there a known offsite impediment No (See?\\otel)
* EVACUATE2-mileRadius
* EVACUATE2-mileRadius
* EVACUATE2-5 miles Downwind 1 Recommendthe  
* EVACUATE2-5 miles Downwind 1
<:e:, Yes Are offsite dose projections or field measurements?::
Recommendthe  
5 rem CDE Thyroid?
<:e:,
consideration of Kl '.'A,: 1 --.. use by the public. ifl'. :;iP***  
Yes Are offsite dose projections or field measurements?:: 5 rem CDE Thyroid?
. /,R_;. No Enclosure 6.4 Oconee Offsite Protective Actions Flowchart-EXPANDED PAR Note 1: For a!! PARs, affected Protective Action Zones (P_.\Zs) are defined in Enclosure 6 .4, Page 5 of 7. IF a PAZ has been accll!ately selected for evacuation, it shall rem2in selected.
consideration of Kl  
Note 2: Offsite agencies have provided prior kno\\1edge of offsite impediments to evacuation (such as flooding, bridge/road  
'.'A,: 1 --..
: closures, ad\*erseweather, traffic control not in place, etc.)_.\.::'\'"])
use by the public.
ifl'.
:;iP***
:;~\\.  
/,R_;.
No  
.4 Oconee Offsite Protective Actions Flowchart-EXPANDED PAR Note 1: For a!! PARs, affected Protective Action Zones (P_.\\Zs) are defined in Enclosure 6.4, Page 5 of 7.
IF a PAZ has been accll!ately selected for evacuation, it shall rem2in selected.
Note 2: Offsite agencies have provided prior kno\\\\1edge of offsite impediments to evacuation (such as flooding, bridge/road closures, ad\\*erseweather, traffic control not in place, etc.)_.\\.::'\\'"])
specifically requested that tliesite NOT issue an evacm!ionPAR.
specifically requested that tliesite NOT issue an evacm!ionPAR.
Note3: A short-term release is onethatcanbeaccuratelyprojected to be< three hours and controlled by the licensee, This consideration would typically apply to controlled venting of containment.
Note3: A short-term release is onethatcanbeaccuratelyprojected to be< three hours and controlled by the licensee, This consideration would typically apply to controlled venting of containment.  
4: Plant conditions e.'t.ist which \>"ould require the classification of a General Emergency per the EALs. This does NOT include consideration of offsite dose-basedE_A..Ls.
~ote 4: Plant conditions e.'t.ist which \\>"ould require the classification of a General Emergency per the EALs. This does NOT include consideration of offsite dose-basedE_A..Ls.
Is there a Hostile Yes Is there a known off site impediment to evacuation?  
Is there a Hostile Yes Is there a known off site impediment to evacuation?
(See Note2) Yes (See Notel)
(See Note2)
* SHELTER 2-mileRadius No Yes (See Note1) SR/0/ N2000/003 Page 3 of7 From Th"TTIAL PAR Enc. 6.4, Page:? of 7 Continuous Assessment Evaluate PAR based on changes in any ofthefollo\\ing:
Yes (See Notel)
Yes ice: Increase in dose assessment proj eaed values. Increase in field me25Ufement values. Shift in 15-minme average wind direction resulting:
* SHELTER 2-mileRadius No Yes (See Note1)
in additional PA.Zs being affected.
SR/0/ N2000/003 Page 3 of7 From Th"TTIAL PAR Enc. 6.4, Page:? of 7 Continuous Assessment Evaluate PAR based on changes in any ofthefollo\\\\ing:
0 ff site agencies inform the site that o ffiite i.'Ilpedimerrts no longer Termination of active hostile action against the site. IF RPS.A..,
Yes ice:
safer to do so consider evacu:il:ion of sheltered zones based upon radiological assessnent and discussions  
Increase in dose assessment proj eaed values.
\Vith Offsite Agencies.
Increase in field me25Ufement values.
Shift in 15-minme average wind direction resulting: in additional PA.Zs being affected.
0 ff site agencies inform the site that o ffiite i.'Ilpedimerrts no longer e.~ist.
Termination of active hostile action against the site.
IF RPS.A.., ~.-hen safer to do so consider evacu:il:ion of sheltered zones based upon radiological assessnent and discussions \\Vith Offsite Agencies.
Are offsite dose projections or field measurements greater than PAGs'..'
Are offsite dose projections or field measurements greater than PAGs'..'
Yes l . No
Yes l  
~I.
No
* SHELTER 2-5 miles Downwind
* SHELTER 2-5 miles Downwind
* EVACUATE 2-mile Radius ! ,,A ,,,;p, ;p;* l ':!Rr,1 EVACUATE P AZs that exceed PAGs. If projected dose or field 5 rem COE Thyroid then recommend the consideration of Kl use by the public.
* EVACUATE 2-mile Radius  
!,,A  
,,,;p,  
;p;* l  
':!Rr,1 EVACUATE P AZs that exceed PAGs. If projected dose or field measurements~ 5 rem COE Thyroid then recommend the consideration of Kl use by the public.
* SHELTER additional PAZs that exceedPAGs
* SHELTER additional PAZs that exceedPAGs
* EVACUATE2-S miles Downwind  
* EVACUATE2-S miles Downwind  
) '>
) ~- '>  
INITIAL Enclosure 6.4 Oconee Off site Protective Actions SRJO! A/20001003 Page 4 of7 CAUTION:
 
A short term release is any release that can be projected to be 3 hours or Jess in duration.
INITIAL.4 Oconee Off site Protective Actions SRJO! A/20001003 Page 4 of7 CAUTION:
An example would be a "puff release".
A short term release is any release that can be projected to be 3 hours or Jess in duration. An example would be a "puff release". A controlled release is one that can be started and stopped at the licensee's discretion, such as the venting of Containment for pressure control. IF a release is short term AND controlled, THEN sheltering in lieu of evacuation should be considered. { 36 )-
A controlled release is one that can be started and stopped at the licensee's discretion, such as the venting of Containment for pressure control.
[
IF a release is short term AND controlled, THEN sheltering in lieu of evacuation should be considered.  
TOTE: If necessary, obtain needed data from one of the following sources in order of sequence:
{ 36 )-[TOTE: If necessary, obtain needed data from one of the following sources in order of sequence:
A. Oconee SDS (Turn On Code "EROENV")
A. Oconee SDS (Turn On Code "EROENV")  
B. Duke Energy Meteorologist (2-0139. 3-7896, OR 2-4316)
. B. Duke Energy Meteorologist (2-0139.
C. National Weather Service in Greer, S.C. (9-1-864-879-1085.QR 9-1-800-268-7785)  
3-7896, OR 2-4316) C. National Weather Service in Greer, S .C. (9-1-864-879-1085  
.- IF AT ANY TIME a General Emergency is declared, THEN make immediate PROTECTIVE ACTION RECOMMENDATIONS (PARs) within 15 minutes to be entered on Line (l..ofthe Emergency Notification Form (ENF). Determine the meteorological parameters to use based on the 15-minutc average wind direction (SOS "EROENV" screen) as determined from the following chart below:  
.QR 9-1-800-268-7785)  
'Time of Day Met First Priority Second Priority Third Priority Fourth Priority Conditions Parameter 1000 - 1600 Wind 60M reading lOM reading River Tower NWS Direction 1600- 1000 and River Wind between Wind 210&deg; and 360&deg; or Direction 60M reading IOM reading River Tower NWS 0&deg; and 70&deg; 1600-1000 and NWS River Wind between Wind 70&deg; and 210&deg; Direction 60M reading River Tower  
-----.-IF AT ANY TIME a General Emergency is declared, THEN make immediate PROTECTIVE ACTION RECOMMENDATIONS (PARs) within 15 minutes to be entered on Line (l..ofthe Emergency Notification Form (ENF). Determine the meteorological parameters to use based on the 15-minutc average wind direction (SOS "EROENV" screen) as determined from the following chart below: 'Time of Day Met First Priority Second Priority Third Priority Fourth Priority Conditions Parameter 1000 -1600 Wind 60M reading lOM reading River Tower NWS Direction 1600-1000 and River Wind between Wind 210&deg; and 360&deg; or Direction 60M reading IOM reading River Tower NWS 0&deg; and 70&deg; 1600-1000 and NWS River Wind between Wind 70&deg; and 210&deg; Direction 60M reading River Tower Enclosure 6.4 Oconee Off site Protective Actions SRJ0/ A/2000/003 Page 5of7 __ Detennine affected zones from chmt below based on the 15-rninute average wind direction as detennined in previous step: Protective Action Zones Wind Direction 0-2 miles; 2-5 miles; 5-10 miles (RPSA Only) 14.1&deg;-27&deg; AO, Cl, Dl, El, C2, D2, E2 27.1&deg;-42&deg; AO, Cl,Dl,EI, D2,E2 42.1&deg;-66&deg; AO, Dl, El, D2,E2 66.1&deg;-85&deg; AO, D1, EL D2, E2, F2 85.1&deg;-104&deg; AO, Dl,ELFL D2, E2, F2 I 04. J 0-129&deg; AO, El, Fl, E2,F2 129.1&deg;-156&deg; AO, Al, El, Fl, A2, &#xa3;2. F2 156.1&deg;-175&deg; AO, AL El, Fl, A2, F2 175.1&deg;-181&deg; AO, Al, Fl, A2, F2 181.1&deg;-219&deg; AO. Al.Bl.Fl.
.4 Oconee Off site Protective Actions SRJ0/ A/2000/003 Page 5of7
A2. B2. F2 219.1&deg;-255&deg; AO. AL Bl. A2. B2. 255. I 0-27 I 0 AO, AL BL CI. A2, 82. C2 271.1&deg;-297&deg; AO, BLCI. B2,C2 297.1&deg;-312&deg; AO, Bl,Cl. B2, C2, 02 312.1&deg;-345&deg; AO, Bl.Cl, DI, B2, C2, D2 345.1&deg;-14&deg; AO, Cl, DI, C2,D2 Enclosure 6.4 Oconee Off site Protective Actions sRjO/ A/20001003 Page 6of7 NOTE: iF changes to the initial Protective Action Recommendations are recommended, THEN these changes must be transmitted to the offsite agencies within 15 minutes.
__ Detennine affected zones from chmt below based on the 15-rninute average wind direction as detennined in previous step:
Protective Action Zones Wind Direction 0-2 miles; 2-5 miles; 5-10 miles (RPSA Only) 14.1&deg;-27&deg; AO, Cl, Dl, El, C2, D2, E2 27.1&deg;-42&deg; AO, Cl,Dl,EI, D2,E2 42.1&deg;-66&deg; AO, Dl, El, D2,E2 66.1&deg;-85&deg; AO, D1, EL D2, E2, F2 85.1&deg;-104&deg; AO, Dl,ELFL D2, E2, F2 I 04. J 0 -129&deg; AO, El, Fl, E2,F2 129.1&deg;-156&deg; AO, Al, El, Fl, A2, &#xa3;2. F2 156.1&deg;-175&deg; AO, AL El, Fl, A2, F2 175.1&deg;-181&deg; AO, Al, Fl, A2, F2 181.1&deg;-219&deg; AO.
Al.Bl.Fl.
A2. B2. F2 219.1&deg;-255&deg; AO.
AL Bl.
A2. B2.
255. I 0 -27 I 0
AO, AL BL CI.
A2, 82. C2 271.1&deg;-297&deg; AO, BLCI.
B2,C2 297.1&deg;-312&deg; AO, Bl,Cl.
B2, C2, 02 312.1&deg;-345&deg; AO, Bl.Cl, DI, B2, C2, D2 345.1&deg;-14&deg; AO, Cl, DI, C2,D2  
.4 Oconee Off site Protective Actions sRjO/ A/20001003 Page 6of7 NOTE:
iF changes to the initial Protective Action Recommendations are recommended, THEN these changes must be transmitted to the offsite agencies within 15 minutes.
CAUTION:  
CAUTION:  
!Ea zone has been accurately selected for evacuation, THEN it shall remain selected.
!Ea zone has been accurately selected for evacuation, THEN it shall remain selected.
__ IF dose projections indicate that COE Thyroid dose will be 2: 5 Rem, THEN recommend Kl use by the General Public in accordance with State Plans and Policy. {23} Evaluate specific plant conditions.
__ IF dose projections indicate that COE Thyroid dose will be 2: 5 Rem, THEN recommend Kl use by the General Public in accordance with State Plans and Policy. {23}
offsite dose projections, wind direction, field monitoring team data, and assess the need to update Protective Action Recommendations made to the states and counties in the previous notification throughout the event. Review dose projections with the Radiological Assessment Manager to determine if Protective Action Recommendations are required beyond the I 0-mile EPZ. !E Protective Action Recommendations are required beyond I 0 miles, THEN notify states and counties to consider sheltering/evacuating general population located beyond the affected I 0-mile EPZ.
Evaluate specific plant conditions. offsite dose projections, wind direction, field monitoring team data, and assess the need to update Protective Action Recommendations made to the states and counties in the previous notification throughout the event.
Enclosure 6.4 Oconee Offsite Protective Actions SR/0/ A/2000/003 Page 7of7 Oconee Protective Action Zones Mile EPZ (2 and 5-mile radius, inner circles)  
Review dose projections with the Radiological Assessment Manager to determine if Protective Action Recommendations are required beyond the I 0-mile EPZ.  
-Radius From Site Pickens County Oconee County (miles) Zones Zones 0-2 AO AO 2-5 A-1,B-t,C-1 D-1 , E-1, F-1 -* 5-10 A-2. B-2, C-2 D-2, E-2. F-2 INITIAL Enclosure 6.5 Emergency Ciassification Downgradcffcrmination Criteria NO Is the need for a long term cleanup or a*ccovery organization anticipated?
!E Protective Action Recommendations are required beyond I 0 miles, THEN notify states and counties to consider sheltering/evacuating general population located beyond the affected I 0-mile EPZ.  
NO .
.4 Oconee Offsite Protective Actions SR/0/ A/2000/003 Page 7of7 Oconee Protective Action Zones Mile EPZ (2 and 5-mile radius, inner circles)
Do the conditions for the current emergency classification still exist? NO ...................
Radius From Site Pickens County Oconee County (miles)
"""-*-..:
Zones Zones 0-2 AO AO 2-5 A-1,B-t,C-1 D-1, E-1, F-1 5-10 A-2. B-2, C-2 D-2, E-2. F-2  
""--.:.._
 
. ls the current """-., emergency classification a General Emergency?  
INITIAL.5 Emergency Ciassification Downgradcffcrmination Criteria NO Is the need for a long term cleanup or a*ccovery organization anticipated?
., .. , YES Page2 Pagc2 Do not terminate and continue to monitor the classification procedure:
NO  
Catawba RP/O/A/5000/001
"'<,,~
* J\lcGuirc RP/0/A/57110/000
Do the conditions for the "'-:."'-
* Oconee RP/O/MI 000/00 I. . YES . f. ***--,<\'  
current emergency classification still exist?
*----*
NO ls the current emergency classification a General Emergency?  
Pagel YES Do the 11 lower classification  
*~
"'-;* ----'----e..i exist? clnssificution.
YES Page2 Pagc2 Do not terminate and continue to monitor the classification procedure:
NO Terminate all emergency classification  
Catawba RP/O/A/5000/001 J\\lcGuirc RP/0/A/57110/000 Oconee RP/O/MI 000/00 I.  
.. sRi01 A/20001003 Page I of3 INITIALS
. YES  
___ _ PRINTED NAME ___________
. f.  
_
*~
Enclosure 6.5 Emergency Classification Downgradeff crminntion Criteria  
***--,<\\'  
--'-*** Sf{J0/ A/2000/003 Page 2of3 Yes Terminate the current ctassiflcation and declare the plant in recovery l No Continue with the currant classification until a recovery can be declared
*----* --*~~* Pagel YES Do the conditions~*"-.
___ ,_Security threat has been contained.
11 lower classification  
"'-;* ----'----e..i exist?
clnssificution.
NO Terminate all emergency classification..
sRi01 A/20001003 Page I of3 INITIALS ___ _
PRINTED NAME ___________ _  
.5 Emergency Classification Downgradeff crminntion Criteria Sf{J0/ A/2000/003 Page 2of3 Yes Terminate the current ctassiflcation and declare the plant in recovery l No Continue with the currant classification until a recovery can be declared
___,_Security threat has been contained.
Tnhlc I r-No new evacuation or sheltering protective actions are anticipated.
Tnhlc I r-No new evacuation or sheltering protective actions are anticipated.
__ Containment pressure is being maintained less than design pressure.
__ Containment pressure is being maintained less than design pressure.
__ ,_Containment hydrogen levels are less than 9% and stable or decreasing.
__,_Containment hydrogen levels are less than 9% and stable or decreasing.
__ Decay heat rejection to the ultimate heat sink has been established and is stable. This is indicated by either of the following (circle one):
__ Decay heat rejection to the ultimate heat sink has been established and is stable. This is indicated by either of the following (circle one):
* Decay heat removal is considered stable if supported by redundancy or diversity  
Decay heat removal is considered stable if supported by redundancy or diversity  
-Examples ofa satisfactory state include: -2 trains of systems for sump recirculation. -2 trains of Decay Heat Removal (DHR)  
- Examples ofa satisfactory state include:  
-I train of OHR and the ability to cool with the steam generators.  
- 2 trains of systems for sump recirculation.  
-steam generator cooling with 2 trains of feed capability.
- 2 trains of Decay Heat Removal (DHR)  
QR
- I train of OHR and the ability to cool with the steam generators.  
* Decay heat removal is considered stable if no additional fission product barrier challenges would be expected for at least 2 hours following interruption of core cooling.  
- steam generator cooling with 2 trains of feed capability.
(continued on next page) __ The risks from recriticality are acceptably low.
QR Decay heat removal is considered stable if no additional fission product barrier challenges would be expected for at least 2 hours following interruption of core cooling.
Enclosure 6.S Emergency Classification Dowugradcff crmination Criteria
(continued on next page)
__ Radiation Protection is monitoring access to radiologically hazardous areas. __ Offsite conditions do not limit plant access. SRJO/ A/2000/003 Page 3of3 __ The Public Information Coordinator, NRC officials, and State representatives have been consulted lo determine the effects of termination on their activities.
__ The risks from recriticality are acceptably low.  
.S Emergency Classification Dowugradcff crmination Criteria
__ Radiation Protection is monitoring access to radiologically hazardous areas.
__ Offsite conditions do not limit plant access.
SRJO/ A/2000/003 Page 3of3
__ The Public Information Coordinator, NRC officials, and State representatives have been consulted lo determine the effects of termination on their activities.
__ The recovery organization is ready to assume control ofrecovery operations:
__ The recovery organization is ready to assume control ofrecovery operations:
* Catawba -RP/O/B/5000/025 o McGuire -RP/O/A/5700/024 o Oconee -RP 0/A/I 000/027 Enclosure 6.6 Radiological Assessment Manager Checldist SR/01 A/2000/003 Page 1of5 NOTE: Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.
Catawba - RP/O/B/5000/025 o
___ I_F reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.
McGuire - RP/O/A/5700/024 o
__ Don position badge. __ Log in to RAM computer.
Oconee - RP 0/A/I 000/027  
__ Log into WebEOC. __ Sign in on Sign Jn board. __ Obtain copy of AD-EP-ALL-0202, Emergency Response Offsite Dose Assessment.  
.6 Radiological Assessment Manager Checldist  
-*-IF Field Monitoring teams have been dispatched, THEN ensure FMC has established communication with Field Monitoring teams. __ Notify EOF Director that Radiological Assessment Manager (RAM) position is operational.
--~ITIAL SR/01 A/2000/003 Page 1of5 NOTE:
__ Ensure all Radiation Protection personnel reporting lo the EOF sign in on Sign In board. __ Ensure that EOF Dose Assessors are kept informed of pertinent plant information including, but not limited to: I) Time o:f TSC activation  
Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.
: 2) Time of EOF activation  
I_F reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.
: 3) Time of reactor trip 4) Status of safety injection  
__ Don position badge.
: 5) Status of onsite radiological conditions  
__ Log in to RAM computer.
: 6) Time next emergency notification message is due. __ Establish Position Log of activities sufficient to conduct turnover for on-coming shift. __ Communicate to EOF Director:  
__ Log into WebEOC.
: 1) Any release in progress, including dose rates (especially at the site boundary)  
__ Sign in on Sign Jn board.
: 2) Field Team status/data  
__ Obtain copy of AD-EP-ALL-0202, Emergency Response Offsite Dose Assessment.  
: 3) On-site radiological concerns  
-*-IF Field Monitoring teams have been dispatched, THEN ensure FMC has established communication with Field Monitoring teams.
: 4) Need to request the site pull a reactor coolant sample for Dose Equivalent Iodine to support emergency classification 1ITIALS PRINTED NAME __________
__ Notify EOF Director that Radiological Assessment Manager (RAM) position is operational.
_
__ Ensure all Radiation Protection personnel reporting lo the EOF sign in on Sign In board.
Enclosure 6.6 Radiological Assessment Manager Checklist' SRJQ/ A/2000/003 Page 2 of 5 __ Review Criteria in "Classification of Emergency" procedure for emergency classification changes and discuss with Accident Assessment perso1mel plant conditions including power failures, valve closures, etc. NOTE: Catawba RP/O/ A/5000/001  
__ Ensure that EOF Dose Assessors are kept informed of pertinent plant information including, but not limited to:
I)
Time o:f TSC activation
: 2)
Time of EOF activation
: 3)
Time of reactor trip
: 4)
Status of safety injection
: 5)
Status of onsite radiological conditions
: 6)
Time next emergency notification message is due.
__ Establish Position Log of activities sufficient to conduct turnover for on-coming shift.
__ Communicate to EOF Director:
: 1)
Any release in progress, including dose rates (especially at the site boundary)
: 2)
Field Team status/data
: 3)
On-site radiological concerns
: 4)
Need to request the site pull a reactor coolant sample for Dose Equivalent Iodine to support emergency classification 1ITIALS PRINTED NAME __________ _  
.6 Radiological Assessment Manager Checklist' SRJQ/ A/2000/003 Page 2 of 5
__ Review Criteria in "Classification of Emergency" procedure for emergency classification changes and discuss with Accident Assessment perso1mel plant conditions including power failures, valve closures, etc.
NOTE:
Catawba RP/O/ A/5000/001  
.QR McGuire RP/O/A/5700/000 OR Oconee RP/O/ All 0001001.
.QR McGuire RP/O/A/5700/000 OR Oconee RP/O/ All 0001001.
* Microsoft Lyne (Skype for Business) is an acceptable communications method.
Microsoft Lyne (Skype for Business) is an acceptable communications method.
* Oconee TSC Dose Assessment  
Oconee TSC Dose Assessment Liaison, 9-1-864-873-4902.
: Liaison, 9-1-864-873-4902.
Gi Catawba/McGuire, Dose Assessment Bridge, 9-980-875-4980.
Gi Catawba/McGuire, Dose Assessment Bridge, 9-980-875-4980.
Establish communications with dose assessment personnel at TSC. Compare information.
Establish communications with dose assessment personnel at TSC. Compare information. projections and strategies with TSC.
projections and strategies with TSC. NOTE: Descriptions of Keo wee Hydro Dam/Dike Imminent Failure/Potential Failure arc provided in Enclosure 6.21 . ___ IF Imminent Dam Failure (Keowee or Jocassee) exists, THEN make the following Protective Action Recommendations to Oconee County and Pickens County for imminent/actual dam fail me and include on the Emergency Notification Form Line 6 (Other):
NOTE:
Aiove residents living downstream of the Keowee Hydro Prqjel'l dams to higher ground. Prohibit traffic.flow across bridges ident{fied on your inundation maps until the danger has passed.
Descriptions of Keo wee Hydro Dam/Dike Imminent Failure/Potential Failure arc provided in.21.
Enclosure 6.6 Radiological Assessment Manager Checklist SR/0/ A/2000/003 Page 3of5 NOTE: Enclosure 6.2 (for CNS), Enclosure 6.3 (for MNS), and Enclosure 6.4 (for ONS) provide guidance for PA Rs and KI protective action recommendations  
___ IF Imminent Dam Failure (Keowee or Jocassee) exists, THEN make the following Protective Action Recommendations to Oconee County and Pickens County for imminent/actual dam fail me and include on the Emergency Notification Form Line 6 (Other):
. . U' General Emergency is declared, THEN provide PAR information on Line 6 of the Emergency Notification Form: CAUTION:
Aiove residents living downstream of the Keowee Hydro Prqjel'l dams to higher ground.
Prohibit traffic.flow across bridges ident{fied on your inundation maps until the danger has passed.  
.6 Radiological Assessment Manager Checklist SR/0/ A/2000/003 Page 3of5 NOTE:.2 (for CNS), Enclosure 6.3 (for MNS), and Enclosure 6.4 (for ONS) provide guidance for PA Rs and KI protective action recommendations.
. U' General Emergency is declared, THEN provide PAR information on Line 6 of the Emergency Notification Form:
CAUTION:
IF a zone has been accurately selected for evacuation, THEN it sl-iall remain selected.
IF a zone has been accurately selected for evacuation, THEN it sl-iall remain selected.
o Zones for Evacuation o Zones for Sheltering u Use of KI for General Public. {23 J o Other PA Rs. Determine, with input from the Accident Assessment Manager (AAM), Protective Actions using D Enclosure 6.2, Catawba Offsite Protective Actions D Enclosme 6.3. McGnire Offaite Protective Actions D Enclosure 6.4. Oconee Offsite Protective Actions NOTE: IF changes to the initial Protective Action Recommendations, including KL are recommended to and approved by the EOF Director, THEN these changes shall be transmitted to the offsite agencies within 15 minutes and the reason for the Protective Action Recommendation change be reported on Line 12 of the ENF. Review dose projections and determine if Protective Action Recommendations are required beyond l 0-mile EPZ. Provide EOF Director Protective Action Recommendations.
o Zones for Evacuation o
Enclosure 6.6 Radiological Assessment Manager Checklist Evaluate Emergency Release Status: SR/0/ A/2000/003 Page 4of5
Zones for Sheltering u Use of KI for General Public. {23 J o
* None -no release of radioactivity generated by the event and no release expected.
Other PA Rs.
o ls Occurring  
Determine, with input from the Accident Assessment Manager (AAM), Protective Actions using D.2, Catawba Offsite Protective Actions D
-radioactivity generated during an event that is currently being released through any defined accident  
Enclosme 6.3. McGnire Offaite Protective Actions D.4. Oconee Offsite Protective Actions NOTE: IF changes to the initial Protective Action Recommendations, including KL are recommended to and approved by the EOF Director, THEN these changes shall be transmitted to the offsite agencies within 15 minutes and the reason for the Protective Action Recommendation change be reported on Line 12 of the ENF.
: pathway, as indicated by ANY of the following:
Review dose projections and determine if Protective Action Recommendations are required beyond l 0-mile EPZ.
McGuire/Catawba EMF-38, 39, 40, 51 (MNS), 53 (CNS) containment monitor reading(s) indicate an increase AND contai1m1ent pressure is greater than 0.3 psig EMF-38, 39, 40, 51 (MNS), 53 (CNS) containment monitor reading(s) indicate an increase AND a known leak path exists from containment  
Provide EOF Director Protective Action Recommendations.  
-EMF-36 unit vent monitor reading indicates an increase in activity EMF-33 CSAE exhaust monitor reading or other alternate means indicates steam generator tube leakage A known unmonitored release path exists AND radioactive material exists Alternate method of release determination  
.6 Radiological Assessment Manager Checklist Evaluate Emergency Release Status:
-Field Monitoring Team results.
SR/0/ A/2000/003 Page 4of5 None - no release of radioactivity generated by the event and no release expected.
Oconee RIA-47. 48. 49, 49A. 57 or 58 containment monitor reading(s) indicate an increase AND containment pressure is greater than I psig RIA-47, 48, 49, 49A. 57 or 58 containment monitor reading(s) indicate an increase AND a known leak path exists from containment RIA-45 or 46 unit vent monitor reading(s) indicate an increase in activity  
o ls Occurring - radioactivity generated during an event that is currently being released through any defined accident pathway, as indicated by ANY of the following:
-RIA-40 CSAE exhaust monitor reading or other alternate means indicates steam generator tube leakage
McGuire/Catawba EMF-38, 39, 40, 51 (MNS), 53 (CNS) containment monitor reading(s) indicate an increase AND contai1m1ent pressure is greater than 0.3 psig EMF-38, 39, 40, 51 (MNS), 53 (CNS) containment monitor reading(s) indicate an increase AND a known leak path exists from containment EMF-36 unit vent monitor reading indicates an increase in activity EMF-33 CSAE exhaust monitor reading or other alternate means indicates steam generator tube leakage A known unmonitored release path exists AND radioactive material exists Alternate method of release determination Field Monitoring Team results.
Oconee RIA-47. 48. 49, 49A. 57 or 58 containment monitor reading(s) indicate an increase AND containment pressure is greater than I psig RIA-47, 48, 49, 49A. 57 or 58 containment monitor reading(s) indicate an increase AND a known leak path exists from containment RIA-45 or 46 unit vent monitor reading(s) indicate an increase in activity RIA-40 CSAE exhaust monitor reading or other alternate means indicates steam generator tube leakage
* A known unmonitored release path exists, AND radioactive material exists Alternate method of release determination Field Monitoring Team results.
* A known unmonitored release path exists, AND radioactive material exists Alternate method of release determination Field Monitoring Team results.
o Has Occurred  
o Has Occurred - any radioactivity released lo the environment during a declared emergency event, but has been stopped.
-any radioactivity released lo the environment during a declared emergency event, but has been stopped.
Provide Emergency Release Status input for Linc 5 of ENF.  
Provide Emergency Release Status input for Linc 5 of ENF.
 
NOTE: Enclosure 6.6 Radiological Assessment Manager Checklist SRJO/ A/2000/003 Page 5 of 5 Stability Class versus Delta-T charts are contained in the URI Job aid located at https :/ /n uc.duke-energy.com/si tes/RP J A/Si tcPages/I-Iome.aspx Provide on ENF Line 9:
NOTE:.6 Radiological Assessment Manager Checklist SRJO/ A/2000/003 Page 5 of 5 Stability Class versus Delta-T charts are contained in the URI Job aid located at https :/ /n uc.duke-energy.com/si tes/RP J A/Si tcPages/I-Iome.aspx Provide on ENF Line 9:
* Wind Direction (15 minute average Upper)
Wind Direction (15 minute average Upper)
* Wind Speed (15 minute average Upper)
Wind Speed (15 minute average Upper)
* Precipitation Type (Inches in last 15 minutes)  
Precipitation Type (Inches in last 15 minutes)
" Stability Class. NOTES: 1. Emergency Release data are not required for initial Emergency Notification Forms QR notifications of changes in Protective Action Recommendations.  
Stability Class.
: 2. It is inappropriate to provide information for liquid releases on ENF Lines 10and11.
NOTES: 1.
as they cannot be quantified using URI and are not the basis for Protective Action Recommendations.
Emergency Release data are not required for initial Emergency Notification Forms QR notifications of changes in Protective Action Recommendations.
It is appn)priatc to provide information about liquid releases on Line 12. Remarks.
: 2.
It is inappropriate to provide information for liquid releases on ENF Lines 10and11. as they cannot be quantified using URI and are not the basis for Protective Action Recommendations. It is appn)priatc to provide information about liquid releases on Line
: 12. Remarks.
__ Provide on ENF Line I 0:
__ Provide on ENF Line I 0:
* Release Characterization (Type (Ground) and Units (Ci/Sec))
Release Characterization (Type (Ground) and Units (Ci/Sec))
* Magnitude (Ci/Sec Release rates from Dose Assessment Report) __ Provide Projection Parameters on ENF Line 11: o Projection period ="Plume Expost,re Duration" in hours from Page 3 of URI Dose Assessment report o Estimated Release Duration  
Magnitude (Ci/Sec Release rates from Dose Assessment Report)
="Release Duration" from Page 1 of URI Dose Assessment Report by adding forecast period and time elapsed since release began. o Date and time projection was performed.
__ Provide Projection Parameters on ENF Line 11:
__ Provide Projected Dose information on ENF Line 11, by entering "TEDE" and " Thyroid COE" data from URI Dose Assessment report. __ Assist Public Affairs and/or Public Spokesperson with dose comparisons based on computer model or field data. NOTE: IF necessary to relieve Duke Energy personnel, THE..N environmental surveillance support personnel from the DOE Radiological Assistance Plan may be requested by the Radiological Assessment Manager through the EOF Director.
o Projection period ="Plume Expost,re Duration" in hours from Page 3 of URI Dose Assessment report o
__ IF THEN conduct turnover for on-coming shift. __ Provide all completed paperwork to Emergency Preparedness upon deactivation ofEOF.
Estimated Release Duration ="Release Duration" from Page 1 of URI Dose Assessment Report by adding forecast period and time elapsed since release began.
1-Enclosure 6.7 EOF Dose Assessor Checklist INITIAL SR/0/ A/2000/003 Page 1 of 4 NOTE: Steps in this checklist may be performed in any order appropriate to the specific event *conditions or they may be omitted if not applicable.
o Date and time projection was performed.
__ Provide Projected Dose information on ENF Line 11, by entering "TEDE" and " Thyroid COE" data from URI Dose Assessment report.
__ Assist Public Affairs and/or Public Spokesperson with dose comparisons based on computer model or field data.
NOTE:
IF necessary to relieve Duke Energy personnel, THE..N environmental surveillance support personnel from the DOE Radiological Assistance Plan may be requested by the Radiological Assessment Manager through the EOF Director.
__ IF needed~ THEN conduct turnover for on-coming shift.
__ Provide all completed paperwork to Emergency Preparedness upon deactivation ofEOF.  
 
1-.7 EOF Dose Assessor Checklist INITIAL SR/0/ A/2000/003 Page 1 of 4 NOTE:
Steps in this checklist may be performed in any order appropriate to the specific event  
*conditions or they may be omitted if not applicable.
__ IF reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.
__ IF reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.
__ Don position badge. __ Log in to PC __ Log in to WebEOC. __ Sign in on Sign In board. __ Obtain copy of AD-EP-ALL-0202, Emergency Response Offsite Dose Assessment.
__ Don position badge.
__ Initiate Position Log of activities sufficient to conduct a turnover for on-coming shirt. __ Acquire necessary dose assessment and plant status infornrntion,
__ Log in to PC
__ !E data acquisition programs are unavailable.
__ Log in to WebEOC.
THEN request SDS data from TSC or instrument readings from Control Room (EMF and Met data). NOTE: Be aware of the effects of loss of power on critical EMFs (Catawba and McGuire) or RIAs (Oconee).
__ Sign in on Sign In board.
__ Verify operability and validity of EMFs (Catawba and McGuire) or RIAs (Oconee) through the TSC. __ IF Catawba or McGuire event is in progress, THEN verify effluent discharge aligmnent with Shift Lab, Radiation Protection Manager (TSC), or Dose Assessors (TSC) as necessary.
__ Obtain copy of AD-EP-ALL-0202, Emergency Response Offsite Dose Assessment.
__ IF Oconee event is in progress, THEN verify effluent discharge alignment with TSC Dose Assessment Liaison (gas tank), RP Manager (gas tank or liquid releases).
__ Initiate Position Log of activities sufficient to conduct a turnover for on-coming shirt.
or Chemistry Manager in the OSC (liquid releases).
__ Acquire necessary dose assessment and plant status infornrntion,
fNITIALS
__ !E data acquisition programs are unavailable. THEN request SDS data from TSC or instrument readings from Control Room (EMF and Met data).
___ _ PRINTED NAME ___________
NOTE:
_
Be aware of the effects of loss of power on critical EMFs (Catawba and McGuire) or RIAs (Oconee).
Enclosure
__ Verify operability and validity of EMFs (Catawba and McGuire) or RIAs (Oconee) through the TSC.
: 6. 7 EOF Dose Assessor Checklist*
__ IF Catawba or McGuire event is in progress, THEN verify effluent discharge aligmnent with Shift Lab, Radiation Protection Manager (TSC), or Dose Assessors (TSC) as necessary.
NOTE: SR/0/ N2000/003 Page 2of4 o Microsoft Lyne (Skype for Business) is an acceptable communications method. o Oconee, TSC Dose Assessment  
__ IF Oconee event is in progress, THEN verify effluent discharge alignment with TSC Dose Assessment Liaison (gas tank), RP Manager (gas tank or liquid releases). or Chemistry Manager in the OSC (liquid releases).
: Liaison, 9-1-864-873-3705.
fNITIALS ___ _
PRINTED NAME ___________ _  
. 7 EOF Dose Assessor Checklist*
NOTE:
SR/0/ N2000/003 Page 2of4 o
Microsoft Lyne (Skype for Business) is an acceptable communications method.
o Oconee, TSC Dose Assessment Liaison, 9-1-864-873-3705.
o Catawba/McGuire, Dose Assessment Bridge, 9-980-875-4980.
o Catawba/McGuire, Dose Assessment Bridge, 9-980-875-4980.
__ Establish communications with dose assessment personnel at TSC. Compare information, projections and strategies with TSC. __ Obtain Dose Assessor turnover from TSC: I. Release in progress:
__ Establish communications with dose assessment personnel at TSC. Compare information, projections and strategies with TSC.
No: ___ _ Yes: ----Is occurring
__ Obtain Dose Assessor turnover from TSC:
__ Has occurred__
I. Release in progress: No: ___ _
Time ___ ,,, __ Normal Operating Limits: Below __ ___,;Above
Yes: ----
__ _ 2. Recommended Protective Actions:
Is occurring __
Has occurred__ Time ___,,, __
Normal Operating Limits:
Below __ ___,;Above __ _
: 2. Recommended Protective Actions:
GS] No Recommended Protective Actions_
GS] No Recommended Protective Actions_
1i3l Evacuate
1i3l Evacuate ____________________ _
____________________
C Shelter-In-Place _________________ _
_ C Shelter-In-Place
D Other __________________ *---
_________________
: 3. Additional pertinent information necessary to continue monitoring of release and dose assessment calculations.
_ D Other __________________  
Turnover complete date/time: ____________ _
*---3. Additional pertinent information necessary to continue monitoring of release and dose assessment calculations.
__ Verify operability of Health Physics Network (HPN) phone by placing a call to the NRC using the number listed on HPN phone.  
Turnover complete date/time:
 
____________
NOTE:
_ ----------
I.
--, __ Verify operability of Health Physics Network (HPN) phone by placing a call to the NRC using the number listed on HPN phone.
Endosurc 6. 7 EOF Dose Assessor Checklist SRJO/ A/2000/003 Page 3 of 4 The NRC Regional Office will request activation of the HPN phone through Emergency Notification System (ENS) telephone if desired.
NOTE: I. Endosurc  
: 2.
: 6. 7 EOF Dose Assessor Checklist SRJO/ A/2000/003 Page 3 of 4 The NRC Regional Office will request activation of the HPN phone through Emergency Notification System (ENS) telephone if desired.  
Information that may be requested over the HPN line could include, but is not I imited to the following:
: 2. Information that may be requested over the HPN line could include, but is not I imited to the following:
Is there any change to the classification of the event? If so, what is the reason?
Is there any change to the classification of the event? If so, what is the reason? Have toxic or radiological releases occurred or been projected (including changes in the release rate)? If so, what are the actual or currently projected onsite and offsite releases, and what is the basis for this assessment?
Have toxic or radiological releases occurred or been projected (including changes in the release rate)?
What are the health effects or consequences to onsite and offsite people? How many onsite or off site people are being or will be affected and to what extent? Is the event under control?
If so, what are the actual or currently projected onsite and offsite releases, and what is the basis for this assessment?
When was control established.
What are the health effects or consequences to onsite and offsite people?
or what is the planned action to bring the event under control?
How many onsite or off site people are being or will be affected and to what extent?
Is the event under control? When was control established. or what is the planned action to bring the event under control?
What mitigative actions are currently underway or planned?
What mitigative actions are currently underway or planned?
What onsitc protective measures have been taken or are planned?
What onsitc protective measures have been taken or are planned?
Line 692: Line 1,004:
What are the current meteorological conditions?
What are the current meteorological conditions?
What are the dose and dose rate readings onsite and offsite?
What are the dose and dose rate readings onsite and offsite?
___ l.._F_1 requested during a drill or actual event, THEN activate HPN phone by calling NRC using number listed on HPN phone. __ Analyze source-ten11 data, formulate source-tenn mitigation strategies, and provide information to Radiological Assessment  
l.._F_1 requested during a drill or actual event, THEN activate HPN phone by calling NRC using number listed on HPN phone.
: Manager, EOF Staff, and TSC Dose Assessors as required.
__ Analyze source-ten11 data, formulate source-tenn mitigation strategies, and provide information to Radiological Assessment Manager, EOF Staff, and TSC Dose Assessors as required.
__ Perform dose projections as appropriate to plant conditions.
__ Perform dose projections as appropriate to plant conditions.
__ Interact with Field Monitoring Coordinator to compare off-site dose projections to actual field readings.
__ Interact with Field Monitoring Coordinator to compare off-site dose projections to actual field readings.  
Enclosure 6.7 EOF Dose Assessor Checklist S R/0 I A/2000/003 Page 4of4 NOTE: Emergency Release data are not required for initial Emergency Notification Forms QR notifications of changes in Protective Action Recommendations.
.7 EOF Dose Assessor Checklist S R/0 I A/2000/003 Page 4of4 NOTE:
_ .. ___ Evaluate dose projections and provide protective action recommendations to Radiological Assessment Manager and EOF Director.
Emergency Release data are not required for initial Emergency Notification Forms QR notifications of changes in Protective Action Recommendations.
_.. ___ Evaluate dose projections and provide protective action recommendations to Radiological Assessment Manager and EOF Director.
_ _...I=F.._.SAMGs are implemented AND offsite releases approach or exceed 1 OOmRem TEDE or 500mRem Thyroid COE, THEN notify EOF SAMO Evaluator (in Accident Assessment Area). (Applicable to Catawba and McGuire).  
_ _...I=F.._.SAMGs are implemented AND offsite releases approach or exceed 1 OOmRem TEDE or 500mRem Thyroid COE, THEN notify EOF SAMO Evaluator (in Accident Assessment Area). (Applicable to Catawba and McGuire).  
--=I.F'-"
--=I.F'-" SAM Gs are implemented AND offsite releases approach or exceed 1 Rem TEDE or 5 Rem Thyroid COE, THEN notify EOF SAMO Evaluator (in Accident Assessment Area). (Applicable to Catawba and McGuire).
SAM Gs are implemented AND offsite releases approach or exceed 1 Rem TEDE or 5 Rem Thyroid COE, THEN notify EOF SAMO Evaluator (in Accident Assessment Area). (Applicable to Catawba and McGuire).
__..-lF._neeclccl, THEN conduct turnover for on-coming shift.
__ ..-lF._neeclccl, THEN conduct turnover for on-coming shift. __ Restore equipment to "Ready Status" and notify appropriate personnel of conditions that would cause a less than operational status. __ Provide nil completed paperwork to Emergency Preparedness upon deactivation of EOF.
__ Restore equipment to "Ready Status" and notify appropriate personnel of conditions that would cause a less than operational status.
Enclosure 6.8 Field Monitoring Coordinator Checklist INITIAL SR/0/ A/2000/003 Page I of2 NOTE: Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.
__ Provide nil completed paperwork to Emergency Preparedness upon deactivation of EOF.  
___ IF_reporting to EOF outside your normal work hours. THEN complete a Fitness for Duty Questio1rnaire.
.8 Field Monitoring Coordinator Checklist INITIAL SR/0/ A/2000/003 Page I of2 NOTE:
__ Don position badge. ___ Log in to PC __ Log in to WebEOC. __ Sign in on Sign In board. NCYfE;-Fie.Id by the EOF  
Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.
.. *-----1 act1vat1011 of the EOI*. ** * . . -. ..... --*-** . .. __ Obtain copy of AD-EP-ALL-0203.
IF_reporting to EOF outside your normal work hours. THEN complete a Fitness for Duty Questio1rnaire.
Protocol for the Field Monitoring Coorclinaior During Emergency Conditions.
__ Don position badge.
__ Establish Position Log of activities sufficient enough to conduct a turnover for on-coming shift. NOTE: 1. For drill or exercise met data. choose appropriate site simulator SOS resource.  
___ Log in to PC
: 2. For real time met data, choose the SOS resource for a specific site and unit. __ Refer to Procedure Step 3.2 to access SOS. INITIALS
__ Log in to WebEOC.
___ _ PRINTED NAME __________
__ Sign in on Sign In board.
_
NCYfE;- Fie.Id ~cams_ may_l~e ?ir~~t~d by the EOF Field-M~;~*i*t*~;:;~;g Coordinat~;:*(l~Nfr.~-)--p~:f;;;:t~.. *-----1 act1vat1011 of the EOI*.
Enclosure 6.8 Field Monitoring Coordinator Checklist srvO; A/20001003 Page 2 of2 WHEN EOF Radio Operator has established communications with field monitoring teams, THEN notify TSC Dose Assessors and provide direction to field monitoring teams. Catawba Specific Perform duties as described in the following:
__ Obtain copy of AD-EP-ALL-0203. Protocol for the Field Monitoring Coorclinaior During Emergency Conditions.
o HP/O/B/1009/004, "Environmental Monitoring for Emergency Conditions Within the Ten Mile Radius of CNS" o HP/O/B/I 009/019, "Emergency Radio System Operation, Maintenance,  
__ Establish Position Log of activities sufficient enough to conduct a turnover for on-coming shift.
& Communication".  
NOTE:
--=IF ... needed, THEN conduct turnover for on-coming shift. __ Restore equipment to "Ready Status" and notify appropriate personnel of conditions that would cause a less than operational status. __ Provide all completed procedtfres and copies of logs to Emergency Preparedness upon deactivation of EOF.
: 1.
INITIAL Enclosure 6.9 Radio Operator Checklist sRJ01 A/20001003 Page I of 1 NOTE: Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.  
For drill or exercise met data. choose appropriate site simulator SOS resource.
: 2.
For real time met data, choose the SOS resource for a specific site and unit.
__ Refer to Procedure Step 3.2 to access SOS.
INITIALS ___ _
PRINTED NAME __________ _  
.8 Field Monitoring Coordinator Checklist srvO; A/20001003 Page 2 of2 WHEN EOF Radio Operator has established communications with field monitoring teams, THEN notify TSC Dose Assessors and provide direction to field monitoring teams.
Catawba Specific Perform duties as described in the following:
o HP/O/B/1009/004, "Environmental Monitoring for Emergency Conditions Within the Ten Mile Radius of CNS" o
HP/O/B/I 009/019, "Emergency Radio System Operation, Maintenance, &
Communication".  
--=IF  
~ needed, THEN conduct turnover for on-coming shift.
__ Restore equipment to "Ready Status" and notify appropriate personnel of conditions that would cause a less than operational status.
__ Provide all completed procedtfres and copies of logs to Emergency Preparedness upon deactivation of EOF.  
 
INITIAL.9 Radio Operator Checklist sRJ01 A/20001003 Page I of 1 NOTE:
Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.  
--=IF._reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.
--=IF._reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.
__ Don position badge. __ Log in to PC __ Log in lo WebEOC. __ Sign in on Sign Jn board. __ Establish Position Log of activities sufficient to conduct turnover for on-coming shift. __ Obtain copy of AD-EP-ALL-0203.
__ Don position badge.
Protocol for the Field Monitoring Coordinator During Emergency Conditions.
__ Log in to PC
Enclosure 5.3 (Field Monitoring Survey data Sheet) and Enclosure 5.4 (Meteorological Update for Field Monitoring Teams). __ Establish contact with Field Teams. __ Communicate instructions from Field Monitoring Coordinator to Field Teams. __ Conduct turnover for on-coming shift if needed. __ Provide all completed paperwork to Emergency Preparedness upon deactivation of EOF. INITIALS
__ Log in lo WebEOC.
___ _ PRINTED NAME ___________
__ Sign in on Sign Jn board.
_
__ Establish Position Log of activities sufficient to conduct turnover for on-coming shift.
INITIAL NOTE: Enclosure 6.10 SR/0/A/2000/003 EOF Offsite Agency Communicator Checklist Page I of2 Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.  
__ Obtain copy of AD-EP-ALL-0203. Protocol for the Field Monitoring Coordinator During Emergency Conditions. Enclosure 5.3 (Field Monitoring Survey data Sheet) and Enclosure 5.4 (Meteorological Update for Field Monitoring Teams).
__ Establish contact with Field Teams.
__ Communicate instructions from Field Monitoring Coordinator to Field Teams.
__ Conduct turnover for on-coming shift if needed.
__ Provide all completed paperwork to Emergency Preparedness upon deactivation of EOF.
INITIALS ___ _
PRINTED NAME ___________ _
 
INITIAL NOTE:.10 SR/0/A/2000/003 EOF Offsite Agency Communicator Checklist Page I of2 Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.  
--=IF._1 reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questio1maire.
--=IF._1 reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questio1maire.
__ Don position badge. __ Log in to PC __ Log in to WebEOC. __ Sign in on Sign In board. NOTE: The following step is for EOF Director's Area data display.
__ Don position badge.
__ Establish Emergency Notification Form display using Offsite Agency Communicator's Computer in EOF Director's Area: D Open EN Form. D Drag to EN Form right monitor AND maximize.
__ Log in to PC
__ Establish Position Log of activities sufficient to conduct turnover for on-coming shill. __ Notify INPO for an Ale1t, Site Area Emergency, General or any event expected to require significant industry  
__ Log in to WebEOC.
: support, including the name of the affected sile(s) and a name and phone number to call for additional infonnation at one of the following numbers:  
__ Sign in on Sign In board.
{IERLI-13-10}
NOTE:
0 9-1-800-321-0614 Ill 9-l-770-644-8091
The following step is for EOF Director's Area data display.
___ IF_requested, TH EN: Provide INPO Emergency Director with a brief description of the nature of the event. *' Identify any equipment or support needed from INPO.
__ Establish Emergency Notification Form display using Offsite Agency Communicator's Computer in EOF Director's Area:
* Respond when contacted for periodic updates.
D Open EN Form.
D Drag to EN Form right monitor AND maximize.
__ Establish Position Log of activities sufficient to conduct turnover for on-coming shill.
__ Notify INPO for an Ale1t, Site Area Emergency, General Emergency~ or any event expected to require significant industry support, including the name of the affected sile(s) and a name and phone number to call for additional infonnation at one of the following numbers: {IERLI-13-10}
0 9-1-800-321-0614 Ill 9-l-770-644-8091 IF_requested, TH EN:  
*~
Provide INPO Emergency Director with a brief description of the nature of the event.  
*' Identify any equipment or support needed from INPO.
Respond when contacted for periodic updates.
__ Perform duties as described in procedure SR/O/A/2000/004 (Notification to States and Counties from the Emergency Operations Facility).
__ Perform duties as described in procedure SR/O/A/2000/004 (Notification to States and Counties from the Emergency Operations Facility).
__ Ensure emergency notification times are satisfied.
__ Ensure emergency notification times are satisfied.
__ Conduct turnover for on-coming shift, if needed.
__ Conduct turnover for on-coming shift, if needed.  
Enclosure 6.10 SR/0/ A/2000/003 EOF Offsitc Agency Communicator Checklist Page 2 of2 __ Provide all completed paperwork to Emergency Preparedness upon deactivation ofEOF. INITIALS
.10 SR/0/ A/2000/003 EOF Offsitc Agency Communicator Checklist Page 2 of2
___ _ PRINTED NAME _______ _
__ Provide all completed paperwork to Emergency Preparedness upon deactivation ofEOF.
Enclosure 6.l 1 EOF Services Administration/Commissary Checklist SRJO/ A/2000/003 Page 1 of 2 NOTE: Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.
INITIALS ___ _
INITIAL __ IE.reporting to EOF outside your normal work hours, THE['S complete a Fitness for Duty Questionnaire.
PRINTED NAME _______ _  
__ Don position badge. __ Log in to PC __ Log in to WebEOC. __ Sign in on Sign In board. __ Establish Position Log of activities sufficient to conduct turnover for on-coming shift. __ Ensure that the EOF Services Area is set up. __ Provide administrative office support and supplies.
.l 1 EOF Services Administration/Commissary Checklist SRJO/ A/2000/003 Page 1 of 2 NOTE: Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.
such as: o Ortice supplies and equipment o Sccrdarial/clerical services o Copy center/fax services J
INITIAL
NOTE: Personnel without badge access will need to be escorted into the EOF by the Assistant EOF Director, EOF Emergency Planner.
__ IE.reporting to EOF outside your normal work hours, THE['S complete a Fitness for Duty Questionnaire.
EOF Services  
__ Don position badge.
: Manager, or their Mentor. [61] _. __ .Provide for personal needs of ERO, such as: o Food and beverage
__ Log in to PC
* Air travel, hotel, and car rental arrangements o Tables and chairs o Tents Portable toilets o Trash receptacles
__ Log in to WebEOC.
__ Sign in on Sign In board.
__ Establish Position Log of activities sufficient to conduct turnover for on-coming shift.
__ Ensure that the EOF Services Area is set up.
__ Provide administrative office support and supplies. such as:
o Ortice supplies and equipment o
Sccrdarial/clerical services o
Copy center/fax services J  
~------------------**--------------------~
NOTE: Personnel without badge access will need to be escorted into the EOF by the Assistant EOF Director, EOF Emergency Planner. EOF Services Manager, or their Mentor. [61]
_. __.Provide for personal needs of ERO, such as:
o Food and beverage Air travel, hotel, and car rental arrangements o
Tables and chairs o
Tents  
~*. Portable toilets o
Trash receptacles
__ IF requested, THEN provide in-house craft resources.
__ IF requested, THEN provide in-house craft resources.
__ IE.needed_,
__ IE.needed_, THEN contact additional personnel for support.
THEN contact additional personnel for support.
__ Provide all completed paperwork to Emergency Preparedness upon deactivation ofEOF.
__ Provide all completed paperwork to Emergency Preparedness upon deactivation ofEOF. INTTIALS
INTTIALS _____ PRINTED NAME ___________ _  
_____ PRINTED NAME ___________
.11 EOF Services Administration/Commissary Checklist EOF FACILITY POST-EVENT CHECKLIST Secure the EOF Services Area.
_
__ Restock office supplies.
Enclosure 6.11 EOF Services Administration/Commissary Checklist EOF FACILITY POST-EVENT CHECKLIST Secure the EOF Services Area. __ Restock office supplies.
__ l!: needed. THEN:
__ l!: needed. THEN:
* Ensure return ofrelocated office equipment.
Ensure return ofrelocated office equipment.
* Notify hotels/motels of release of rooms. Qt* Assist personnel needing transportation home. SR/0/ A/2000/003 Page 2 of2 :e. Notify vendors to pick up furniture and equipment not needed for recovery.
Notify hotels/motels of release of rooms.
__ Notify vendors to discontinue food services to EOF. ACTION UST FOR CHANGING FROM EMERGENCY TO RECOVERY MODE __ Replenish supplies.
Qt*
Assist personnel needing transportation home.
SR/0/ A/2000/003 Page 2 of2
:e.
Notify vendors to pick up furniture and equipment not needed for recovery.
__ Notify vendors to discontinue food services to EOF.
ACTION UST FOR CHANGING FROM EMERGENCY TO RECOVERY MODE
__ Replenish supplies.
__ Determine additional space requirements.
__ Determine additional space requirements.
__ Prepare weekly work schedules.
__ Prepare weekly work schedules.
Line 764: Line 1,131:
__ Notify portable toilet suppliers for appropriate needs and quantities.
__ Notify portable toilet suppliers for appropriate needs and quantities.
__ Notify trash receptacle suppliers for appropriate needs and quantities.
__ Notify trash receptacle suppliers for appropriate needs and quantities.
__ Establish shift coverage of commissary personnel to suppo1t total recovery efforts.
__ Establish shift coverage of commissary personnel to suppo1t total recovery efforts.  
Enclosure 6.12 Accident Assessment Manager Checklist INITIAL SR/0/ A/2000/003 Pagel of 4 NOTE: Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.
.12 Accident Assessment Manager Checklist INITIAL SR/0/ A/2000/003 Pagel of 4 NOTE:
__ _.I .... F.._reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.
Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.
__ Don position badge. __ Log in to PC __ Log in to WebEOC. __ Sign in on Sign In board. __ Establish Position Log of activities sufficient to conduct turnover for on:-coming shill. NOTE: The following step is needed for EOF Director's Arca data display.
__ _.I.... F.._reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.
__ Don position badge.
__ Log in to PC
__ Log in to WebEOC.
__ Sign in on Sign In board.
__ Establish Position Log of activities sufficient to conduct turnover for on:-coming shill.
NOTE:
The following step is needed for EOF Director's Arca data display.
__ Establish SOS data display.
__ Establish SOS data display.
D Refer to Step 3.2 in procedure body to access SOS for affected site and unit. D Drng SOS display to right monitor AND maximize.
D Refer to Step 3.2 in procedure body to access SOS for affected site and unit.
D Drng SOS display to right monitor AND maximize.
__ Obtain copy of applicable "Classification of Emergency" procedure to provide analysis and advice regarding emergency classifications.
__ Obtain copy of applicable "Classification of Emergency" procedure to provide analysis and advice regarding emergency classifications.
o Catawba:
o Catawba: RP/O/A/5000/001 o
RP/O/A/5000/001 o McGuire:
McGuire: RP/O/A/5700/000 o
RP/O/A/5700/000 o Oconee: RP/O/A/1000/001
Oconee: RP/O/A/1000/001
__ _,IF,_Oconee is affected, IHEN obtain copy of "Oconee Nuclear Site Emergency Action Level Description Guidelines" Manual. __ Ensure PC is on and displaying plant status. __ Post changes in Fission Product Barrier status on Fission Product Barrier Status Board .. __ Provide EAL number and description and declaration time for ENF Line 4 to Offsite Agency Communicators.
__ _,IF,_Oconee is affected, IHEN obtain copy of "Oconee Nuclear Site Emergency Action Level Description Guidelines" Manual.
__ Assist the Radiological Assessment Manager (RAM) in determining Protective Actions using: D Enclosure 6.2. Catawba Offsite Protective Actions D Enclosure 6.3, McGuire Offsite Protective Actions D Enclosure Oconee Offsite Protective Actions Enclosure 6.12 Accident Assessment Manager Checklist SR/0/ A/2000/003 Page 2 of 4 .... --.Provide Prognosis for ENF Line 7 to Offsite Agency Communicators.  
__ Ensure PC is on and displaying plant status.
{I} INITIALS PRINTED NAME-----------
__ Post changes in Fission Product Barrier status on Fission Product Barrier Status Board..
NOTE: Enclosure 6.12 Accident Assessment Manager Checklist s RJO I A/20001003 Page 3 of 4 The Affected Unit on Line 8 is tied to the EAL on Line 4. Examples may not be all inclusive of events that may affoct all units. Provide Affected Unit(s) for ENF Line 8 to Offsite Agency Communicators:
__ Provide EAL number and description and declaration time for ENF Line 4 to Offsite Agency Communicators.
* Evaluate the following for classification for both units (CNS and MNS) or all three units (ONS). o Security event o Seismic event o Tornado on site o Hurricane force winds on site o Loss of both switch yards o Fire in SSF o Fire affecting shared safely related equipment c Imminent Failure for Kcowee Hydro Project Dam/Dike (ONS). o IF event only affects one (I) unit QR.one unit has a higher classification, THEN check appropriate unit. Provide Unit Status for ENF Line 8 to Offaite Agency Communicators.
__ Assist the Radiological Assessment Manager (RAM) in determining Protective Actions using:
D.2. Catawba Offsite Protective Actions D.3, McGuire Offsite Protective Actions D.4~ Oconee Offsite Protective Actions  
.12 Accident Assessment Manager Checklist SR/0/ A/2000/003 Page 2 of 4  
.... --.Provide Prognosis for ENF Line 7 to Offsite Agency Communicators. {I}
INITIALS PRINTED NAME-----------
 
NOTE:.12 Accident Assessment Manager Checklist s RJO I A/20001003 Page 3 of 4 The Affected Unit on Line 8 is tied to the EAL on Line 4. Examples may not be all inclusive of events that may affoct all units.
Provide Affected Unit(s) for ENF Line 8 to Offsite Agency Communicators:
Evaluate the following for classification for both units (CNS and MNS) or all three units (ONS).
o Security event o Seismic event o Tornado on site o Hurricane force winds on site o Loss of both switch yards o Fire in SSF o Fire affecting shared safely related equipment c Imminent Failure for Kcowee Hydro Project Dam/Dike (ONS).
o IF event only affects one (I) unit QR.one unit has a higher classification, THEN check appropriate unit.
Provide Unit Status for ENF Line 8 to Offaite Agency Communicators.
I.E.an upgrade in classification occurs, THEN notify Offsite Agency Communicator.
I.E.an upgrade in classification occurs, THEN notify Offsite Agency Communicator.
Coordinate the following functions:
Coordinate the following functions:
* Accident Assessment Interface
Accident Assessment Interface Operations Interface o
* Operations Interface o Reactor Physics (as needed)
Reactor Physics (as needed)  
Enclosure 6.12 Accident Assessment Manager Checklist SR/0/ A/2000/003 Page 4of4 __ Prepare for EOF Briefings using Enclosure 6.23 (EOF Briefing Guideline).
.12 Accident Assessment Manager Checklist SR/0/ A/2000/003 Page 4of4
__ Prepare for EOF Briefings using Enclosure 6.23 (EOF Briefing Guideline).
__ Assist TSC Emergency Coordinator as requested upon entry into Severe Accident Management Guidelines (SAMGs).
__ Assist TSC Emergency Coordinator as requested upon entry into Severe Accident Management Guidelines (SAMGs).
__ Conduct turnover for on-coming shift, if needed. __ Provide all completed paperwork to Emergency Preparedness upon deactivation of EOF.
__ Conduct turnover for on-coming shift, if needed.
Enclosure 6.13 Accident Assessment Interface Checklist INITIAL SR/0! A/20001003 Page I of 5 NOTE: Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.  
__ Provide all completed paperwork to Emergency Preparedness upon deactivation of EOF.  
--=IF;...*
.13 Accident Assessment Interface Checklist INITIAL SR/0! A/20001003 Page I of 5 NOTE:
reporting to EOF outside your normal work hours. THEN complete a Fitness for Duty Questionnaire.
Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.  
__ Don position badge. ____ Log in to PC __ Log in to WebEOC. __ Sign in on Sign In board. __ Notify Accident Assessment Manager that posit.ion is staffed.
--=IF;...* reporting to EOF outside your normal work hours. THEN complete a Fitness for Duty Questionnaire.
__ Establish Position Log of activities sufficient enough to conduct turnover for on-coming shift. __ Ensure PCs are on and displaying affected station and unit plant status. NOTE: Communications are established after the beep. __ Establish bridge line for Operations Loop for affected station:
__ Don position badge.
D Catawba:
____ Log in to PC
9-803-701-3994 D McGuire:
__ Log in to WebEOC.
9-980-875-4500 D Oconee: 9-1-864-873-4908  
__ Sign in on Sign In board.
__ Notify Accident Assessment Manager that posit.ion is staffed.
__ Establish Position Log of activities sufficient enough to conduct turnover for on-coming shift.
__ Ensure PCs are on and displaying affected station and unit plant status.
NOTE: Communications are established after the beep.
__ Establish bridge line for Operations Loop for affected station:
D Catawba: 9-803-701-3994 D
McGuire: 9-980-875-4500 D
Oconee: 9-1-864-873-4908  
--=IF;...needed for McGuire, THEN establish communications link with Engineering Manager.
--=IF;...needed for McGuire, THEN establish communications link with Engineering Manager.
9-980-875-4954.
9-980-875-4954.  
__ .... IF._Oconee event, THEN establish communications with Operations Interface, 9-1-864-873-3696.
.... IF._Oconee event, THEN establish communications with Operations Interface, 9-1-864-873-3696.
__ Obtain copy of Classification of Emergency procedure for affected station.
__ Obtain copy of Classification of Emergency procedure for affected station.
D Catawba:
D Catawba: RP/O/A/5000/001 D
RP/O/A/5000/001 D McGuire:
McGuire: RP/0/ A/5700/000 D
RP/0/ A/5700/000 D Oconee: RP/O/A/1000/001 INITIALS
Oconee: RP/O/A/1000/001 INITIALS ___ _
___ _ PRINTED NAME ___________
PRINTED NAME ___________ _  
_
.13  
Enclosure 6.13 *Accident Assessment Interface Checklist SR/0/ A/2000/003 Page 2of5 *--Obtain copy of Core Damage Assessment procedure for affected station.
*Accident Assessment Interface Checklist SR/0/ A/2000/003 Page 2of5  
D Catawba:
*-- Obtain copy of Core Damage Assessment procedure for affected station.
RP/O/A/5000/015 0 McGuire:
D Catawba: RP/O/A/5000/015 0
RP/O/ A/5700/019 D Oconee: RP/0/B/10001018.
McGuire: RP/O/ A/5700/019 D
Oconee: RP/0/B/10001018.
__ Gather plant status infonnation using Accident Assessment Initial Information Request Form on page 4 or 5 of this enclosure.
__ Gather plant status infonnation using Accident Assessment Initial Information Request Form on page 4 or 5 of this enclosure.
__ IF AT ANY TIME General Emergency is declared, THEN RECOMMEND IM MEDIATELY to Accident Assessment Manager AND RAM protective actions using: o Enclosure 6.2 -Catawba Offsite Protective Actions o Enclosure 6.3 -McGuire Offsite Protective Actions o Enclosure 6.4 -Oconee Offsite Protective Actions __ Perform the following steps as needed throughout event: __ IE.condition  
__ IF AT ANY TIME General Emergency is declared, THEN RECOMMEND IM MEDIATELY to Accident Assessment Manager AND RAM protective actions using:
: warrants, THEN determine analysis of reactor core and containment conditions in regard lo: o Core sub-cooling o Decay heat generation o Heat removal capabilities (core and containment) o Fission product release potential (core and containment).
o Enclosure 6.2 - Catawba Offsite Protective Actions o Enclosure 6.3 - McGuire Offsite Protective Actions o Enclosure 6.4 - Oconee Offsite Protective Actions
IE.condition warrants.
__ Perform the following steps as needed throughout event:
THEN provide: Estimates of core uncovery times *
__ IE.condition warrants, THEN determine analysis of reactor core and containment conditions in regard lo:
* Interpretations of reactor water level data. Monitor status of Emergency Operations Procedures (EOPs) and discuss with Accident Assessment Manager.
o Core sub-cooling o
Confer with Radiological Assessment group in EOF. Consult with Operations Interface on anticipated course of events. __ Confer with Accident Assessment Manager on the following:
Decay heat generation o
* Anticipated course of events 111. Diagnosis of the accident and mitigation strategies o Analysis of core and containment
Heat removal capabilities (core and containment) o Fission product release potential (core and containment).
* Core damage and fission product release potential 111 Background information of system design
IE.condition warrants. THEN provide:  
* Emergency classifications.
~
Enclosure 6.13 Accident Assessment Interface Checklist sRJO! N2000I003 Page 3of5 __ Support Engineering Manager in TSC in accident and mitigation strategies.
Estimates of core uncovery times Interpretations of reactor water level data.
Monitor status of Emergency Operations Procedures (EOPs) and discuss with Accident Assessment Manager.
Confer with Radiological Assessment group in EOF.
Consult with Operations Interface on anticipated course of events.
__ Confer with Accident Assessment Manager on the following:
Anticipated course of events 111.
Diagnosis of the accident and mitigation strategies o
Analysis of core and containment Core damage and fission product release potential 111 Background information of system design Emergency classifications.  
.13 Accident Assessment Interface Checklist sRJO! N2000I003 Page 3of5
__ Support Engineering Manager in TSC in accident and mitigation strategies.
__ Assist TSC as an evaluator upon entry into Severe Accident Management Guidelines (SAMG) (as requested).  
__ Assist TSC as an evaluator upon entry into Severe Accident Management Guidelines (SAMG) (as requested).  
--=JF;...i' SAM Gs are entered, THEN update SAMG status board. __ ......,IF  
--=JF;...i' SAM Gs are entered, THEN update SAMG status board.  
.... McGuire has entered SAMG, THEN REFER TO Enclosure 6.19 (Establishing Communications Links between McGuire SAMG Evaluators).
......,IF.... McGuire has entered SAMG, THEN REFER TO Enclosure 6.19 (Establishing Communications Links between McGuire SAMG Evaluators).
__ Conduct turnover for on-coming shift, if needed. __ Provide all completed paperwork to Emergency Preparedness upon deactivation of EOF.
__ Conduct turnover for on-coming shift, if needed.
Enclosure 6.13 Accident Assessment Interface Checklist SR/0/ A/2000/003 Page 4of5 Catawba or McGuire Initial Information Re<1uest Initial Information Rcouest Results Emergency Classification Status EAL Declaration Chronology Protective Actions Status Reactor/Turbine Status Power Level Time of Trip & On What Signal Any Abnormal Response NC Pump Status Core Cooling Status (subcooled margin/ RVLIS/natural circulation)  
__ Provide all completed paperwork to Emergency Preparedness upon deactivation of EOF.  
---*-*-***-*
.13 Accident Assessment Interface Checklist SR/0/ A/2000/003 Page 4of5 Catawba or McGuire Initial Information Re<1uest Initial Information Rcouest Results Emergency Classification Status EAL Declaration Chronology Protective Actions Status Reactor/Turbine Status Power Level Time of Trip & On What Signal Any Abnormal Response NC Pump Status Core Cooling Status (subcooled margin/
.... . ... -*-*---Orange or Red CSFs Alarms Received Safety Injection When Actuated  
RVLIS/natural circulation)
& on What Signal ---NV, NI, ND, Ice Condenser Status Fcedwatcr  
Orange or Red CSFs Alarms Received Safety Injection When Actuated & on What Signal NV, NI, ND, Ice Condenser Status Fcedwatcr CF and CA Status Main Steam Isolation Status SMSV. SM PORV, SB Status Electric Power 600V, 4 J 60V, D/G Status Containment Isolation Status NS and VX Status Security/Fire/Flooding/HAZMAT/Other Hazards Plant Conditions Status Off-site Releases Status  
-CF and CA Status Main Steam Isolation Status SMSV. SM PORV, SB Status Electric Power 600V, 4 J 60V, D/G Status Containment Isolation Status NS and VX Status Security/Fire/Flooding/HAZMAT/Other Hazards Plant Conditions Status Off-site Releases Status .... , ___ .. _ .. , ....... -
.13 Accident Assessment Interface Checklist Oconee Initial Information Request Initial Information Rcauest Emergency Classification Status EAL Declaration Chronology Protective Actions Status Reactor/Turbine Status Power Level Time of Trip & On What Signal Any Abnormal Response Reactor Coolant Pump Status Core Cooling Status (subcooled margin/
Enclosure 6.13 Accident Assessment Interface Checklist Oconee Initial Information Request Initial Information Rcauest Emergency Classification Status EAL Declaration Chronology Protective Actions Status Reactor/Turbine Status Power Level Time of Trip & On What Signal Any Abnormal Response Reactor Coolant Pump Status Core Cooling Status (subcooled margin/ RVLIS/nalural circulation)  
RVLIS/nalural circulation)
-* Safety Inicction When Actuated  
Safety Inicction When Actuated & on What Sigmil_
& on What Sigmil_ HPI. LPI Status .. Fcedwater Fecdwater and Emergency Feedwater Status Main Steam Isolation Status MSSV Status Electric Power 600V, 4 l 60V. Keo wee, Lee Status Containment Isolation Status
HPI. LPI Status Fcedwater Fecdwater and Emergency Feedwater Status Main Steam Isolation Status MSSV Status Electric Power 600V, 4 l 60V. Keo wee, Lee Status Containment Isolation Status
* RBS, RBCU Status Sccurity/Firc/Floodin2/HAZMA T /Other Hazards Plant Conditions Status (Keowee Hydro Dam status) Off-site Releases Status SR/0/ A/2000/003 Page 5of5 Results .. .* . . *. i' Enclosure 6.14 Operations Interface Checklist INITIAL NOTE: This enclosure does not apply to Oconee. SR/0/ N2000/003 Page 1 of 1 NOTE: Sleps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.
* RBS, RBCU Status Sccurity/Firc/Floodin2/HAZMA T /Other Hazards Plant Conditions Status (Keowee Hydro Dam status)
Off-site Releases Status SR/0/ A/2000/003 Page 5of5 Results i'  
.14 Operations Interface Checklist INITIAL NOTE:
This enclosure does not apply to Oconee.
SR/0/ N2000/003 Page 1 of 1 NOTE:
Sleps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.
__ !E..reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.
__ !E..reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.
_______ Don position badge. __ Log in to PC __ Log in to WebEOC. __ Sign in on Sign In board. __ Establish Position Log or activities sufficient to conduct turnover for on-coming shift. __ Perform following steps. as needed. throughout event: __ Provide communications interface between Accident Assessment Group and TSC Operations Group. __ Advise Accident Assessment Group on the following:
_______ Don position badge.
e Emergency Operations Procedures (EOPs) u Diagnosis of accident and mitigation strategies 0 Emergency classification.
__ Log in to PC
__ Advise TSC of anticipated course of events. __ Conduct turnover for on-coming shift. if needed. __ Provide all completed paperwork to Emergency Preparedness upon deactivation ofEOF. INITIALS
__ Log in to WebEOC.
___ _
__ Sign in on Sign In board.
INITIAL NOTE: Enclosure 6.15 Emergency Planner Checklist s1v01 A120001003 Page I of 14 Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.
__ Establish Position Log or activities sufficient to conduct turnover for on-coming shift.
__ Perform following steps. as needed. throughout event:
__ Provide communications interface between Accident Assessment Group and TSC Operations Group.
__ Advise Accident Assessment Group on the following:
e Emergency Operations Procedures (EOPs) u Diagnosis of accident and mitigation strategies 0
Emergency classification.
__ Advise TSC of anticipated course of events.
__ Conduct turnover for on-coming shift. if needed.
__ Provide all completed paperwork to Emergency Preparedness upon deactivation ofEOF.
INITIALS ___ _  
 
INITIAL NOTE:.15 Emergency Planner Checklist s1v01 A120001003 Page I of 14 Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.
__ IE.reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.
__ IE.reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.
__ Don position badge. __ Log in to PC __ Log in to WebEOC. __ Set up WebEOC content for display.
__ Don position badge.
D Click on Sign In board. D Drag Sign In board to right monitor AND maximize.
__ Log in to PC
__ Log in to WebEOC.
__ Set up WebEOC content for display.
D Click on Sign In board.
D Drag Sign In board to right monitor AND maximize.
D Click Offsitc Notifications.
D Click Offsitc Notifications.
D Drag Offsite Noli fications to the Jell screen AND maximize
D Drag Offsite Noli fications to the Jell screen AND maximize
__ Sign in on Sign In board. __ Establish Position Log of activities sufficient to conduct turnovci*
__ Sign in on Sign In board.
for on-coming shill. __ (MNS and CNS only) Obtain Emergency Planner wireless phone and headset from Emergency Planner Desk area and access EP bridge line, 9-803-701-4010.
__ Establish Position Log of activities sufficient to conduct turnovci* for on-coming shill.
NOTE: Secure EOF videoconferencing door by locking to the exterior hallway from the inside. Return to the EOF using the EOF hallway door Have on hand all emergency notification forms (ENFs) transmitted to state and local agencies up to this time. Be prepared to answer questions concerning infonnation on the ENFs as well as any other information requested by ECOC Director when called back. __ Contact the Enterprise Crisis Operations Center (ECOC) Director by email at ECOCDirectors@duke-energy.com il.B..by phoning the Enterprise Security Console at 2-8851 or 9-1-800-943-7584, ask them to contact the ECOC Director about the EOF activation, and provide your call back number. ( IER L 1-13-10}  
__ (MNS and CNS only) Obtain Emergency Planner wireless phone and headset from Emergency Planner Desk area and access EP bridge line, 9-803-701-4010.
{ 77] NOTE: Personnel  
NOTE:
\vithout badge access will need to be escorted into the EOF by the Assistant EOF Director.
Secure EOF videoconferencing door by locking to the exterior hallway from the inside. Return to the EOF using the EOF hallway door Have on hand all emergency notification forms (ENFs) transmitted to state and local agencies up to this time. Be prepared to answer questions concerning infonnation on the ENFs as well as any other information requested by ECOC Director when called back.
EOF Emergency  
__ Contact the Enterprise Crisis Operations Center (ECOC) Director by email at ECOCDirectors@duke-energy.com il.B..by phoning the Enterprise Security Console at 2-8851 or 9-1-800-943-7584, ask them to contact the ECOC Director about the EOF activation, and provide your call back number. ( IER L 1-13-10} { 77]
: Planner, EOF Services  
NOTE:
: Manager, or their Mentor. [61] __ Support EOF Director with the following:
Personnel \\vithout badge access will need to be escorted into the EOF by the Assistant EOF Director.
Document Onsite Protective Measures in WebEOC.
EOF Emergency Planner, EOF Services Manager, or their Mentor. [61]
Enclosure 6.15 Emergency Planner Checklist SR/0/ A/2000/003 Page 2of14 Provide escorted access to EOF for personnel without badge access. [61] Document names of personnel escorted in EOF Facility log. __ Complete EOF Director Checklist items as requested.
__ Support EOF Director with the following:
Document Onsite Protective Measures in WebEOC.  
.15 Emergency Planner Checklist SR/0/ A/2000/003 Page 2of14 Provide escorted access to EOF for personnel without badge access. [61]
Document names of personnel escorted in EOF Facility log.
__ Complete EOF Director Checklist items as requested.
__ Clarify Emergency Plan and Emergency Plan Implementing Procedure information.
__ Clarify Emergency Plan and Emergency Plan Implementing Procedure information.
__ Interface with federal, state and local agencies.
__ Interface with federal, state and local agencies.
___ Assist Off-Site Agency Communicators in preparation of emergency notifications.
___ Assist Off-Site Agency Communicators in preparation of emergency notifications.
INITIALS
INITIALS ___ _
___ _ PRINTED NAME-------------
PRINTED NAME-------------
Enclosure 6.15 Emergency Planner Checklist SR/0/ A/2000/003 Page 3of14 ____ IF_a security event at MNS requires assembling MNS TSC/OSC ERO at EOF, THEN complete "MNS Security Event. TSC/OSC Assembled at EOF Checklist,"
.15 Emergency Planner Checklist SR/0/ A/2000/003 Page 3of14 IF_a security event at MNS requires assembling MNS TSC/OSC ERO at EOF, THEN complete "MNS Security Event. TSC/OSC Assembled at EOF Checklist," page 12 of 14 of this enclosure.  
page 12 of 14 of this enclosure.
.;;;.;IF:...a Beyond Design Basis External Event (BDBEE) or Extended Loss of Offsite AC Power (ELAP) event at MNS requires assembling TSC/OSC ERO al the EOF, THEN complete "MNS BDBEE/ELAP, TSC/OSC Assembled at EOF Checklist," page 12of14 of this enclosure. {76}  
__ .;;;.;IF:...a Beyond Design Basis External Event (BDBEE) or Extended Loss of Offsite AC Power (ELAP) event at MNS requires assembling TSC/OSC ERO al the EOF, THEN complete "MNS BDBEE/ELAP, TSC/OSC Assembled at EOF Checklist,"
--=IF_a security event at CNS requires assembling the duty CNS TSC ERO at the EOF, THEN complete "CNS Security Event. TSC ERO Assembled at EOF Checklist," page 13of14 of this enclosure.
page 12of14 of this enclosure.  
NOTE: I. EOF Duty Roster is available on DAE using Nuclear Generation Duty Roster application. EOF information is under General Office location.
{76} --=IF_a security event at CNS requires assembling the duty CNS TSC ERO at the EOF, THEN complete "CNS Security Event. TSC ERO Assembled at EOF Checklist,"
page 13of14 of this enclosure.
NOTE: I. EOF Duty Roster is available on DAE using Nuclear Generation Duty Roster application.
EOF information is under General Office location.  
: 2. Consider hours previously worked prior to ERO activation in determining shill turnover schedules for 24-hour staffing.
: 2. Consider hours previously worked prior to ERO activation in determining shill turnover schedules for 24-hour staffing.
___ Complete 24-1-Iour Staffing Log for each EOF position.
___ Complete 24-1-Iour Staffing Log for each EOF position. pages 5 through I 0 of this enclosure.
pages 5 through I 0 of this enclosure.
__ Close oul WcbEOC Sign In Board
__ Close oul WcbEOC Sign In Board __ Ensure lhat 24-hour staffing plans are established and maintained for all EOF positions for the duration of the entire emergency.  
__ Ensure lhat 24-hour staffing plans are established and maintained for all EOF positions for the duration of the entire emergency. : !ERL 1-13-1 OJ
: !ERL 1-13-1 OJ __ !E.EPZ roadblocks have been established.
__ !E.EPZ roadblocks have been established. THEN prepare for emergency worker re-entry using page 14 of this enclosure.
THEN prepare for emergency worker re-entry using page 14 of this enclosure.
__ Verify Public Affairs personnel have considered 24-hour staffing by calling the JIC Admin.
__ Verify Public Affairs personnel have considered 24-hour staffing by calling the JIC Admin. Manager at 2-0548. __ Record EOF Exercise/Drill/Event Duke Energy employee participation as follows:
Manager at 2-0548.
D IF scheduled drill, THEN activate eRoster program and scan OR enter Duke Energy employee ID number and Submit E-roster at the conclusion of the drill. D IE..not a scheduled drill .QR.scanner-inoperable, THEN request participants sign Exercise/Drill/Event/Training Attendance Sheet. [61]
__ Record EOF Exercise/Drill/Event Duke Energy employee participation as follows:
Enclosure 6.15 Emergency Planner Checklist SR/0/ A/2000/003 Page 4of14 ___ Request Duke Energy participants sign Drill and Event Participation Roster (AD-EP-ALL-0802.
D IF scheduled drill, THEN activate eRoster program and scan OR enter Duke Energy employee ID number and Submit E-roster at the conclusion of the drill.
Conducting Drills and Exercises, Attachment 4, Drill and Event Participation Roster).  
D IE..not a scheduled drill.QR.scanner-inoperable, THEN request participants sign Exercise/Drill/Event/Training Attendance Sheet. [61]  
[61] __ Conduct turnover for on-corning shift, if needed. __ Upon deaclivation of the fo1ward a copy of the Drill and Event Participation Roster ALL-0802, Conducting Drills and Exercises, Attachment Drill and Event Participation Roster) to each DEC site's Emergency Preparedness Manager.
.15 Emergency Planner Checklist SR/0/ A/2000/003 Page 4of14
___ Request Duke Energy participants sign Drill and Event Participation Roster (AD-EP-ALL-0802.
Conducting Drills and Exercises, Attachment 4, Drill and Event Participation Roster). [61]
__ Conduct turnover for on-corning shift, if needed.
__ Upon deaclivation of the EOF~ fo1ward a copy of the Drill and Event Participation Roster (AD-EP-ALL-0802, Conducting Drills and Exercises, Attachment 4~ Drill and Event Participation Roster) to each DEC site's Emergency Preparedness Manager.
__ Upon deactivation of EOF. collect all completed paperwork and forward to appropriate Emergency Preparedness Manager.
__ Upon deactivation of EOF. collect all completed paperwork and forward to appropriate Emergency Preparedness Manager.
__ Upon deactivation of EOF. complete "EOF Post Event Checklist,"
__ Upon deactivation of EOF. complete "EOF Post Event Checklist," page 11 of this enclosure.  
page 11 of this enclosure.
 
Position  
Position EOF Director Assistant EOF Director EOF Log Recorder EOF Emergency Planner Radiological Assessment Manager Accident Assessment Manager.15 Emergency Planner Checklist EOF DIRECTOR AREA 24-HOUR POSITION EOF STAFFING LOG Primary Name  
-****-----***-*-****--*******
*Shift Name Schedule List hours of coverage: i.e., 0800-2000, or Sam -8pm.
EOF Director Assistant EOF Director EOF Log Recorder  
SR/0/A/2000/003 Page 5of14 Relief  
--EOF Emergency Planner Radiological Assessment Manager Accident Assessment Manager Enclosure 6.15 Emergency Planner Checklist EOF DIRECTOR AREA 24-HOUR POSITION EOF STAFFING LOG Primary Name *Shift Name Schedule  
*Shift Schedule  
.....................
 
* List hours of coverage:
Position EOF Dose Assessor EOF Dose Assessor EOF Dose Assessor EOF Dose Assessor (HPN)
i.e., 0800-2000, or Sam -8pm. SR/0/A/2000/003 Page 5of14 Relief *Shift Schedule  
Field Monitoring Coordinator Radio Operator.15 Emergency Planner Checklist DOSE ASSESSMENT AREA sRJO/ N2000I003 Page 6of14 24-HOUR POSITION EOF STAFFING LOG Primary Relief Name  
............
*Shift Name  
,,,. ___ ,_,,,,, . 
*Shift Schedule Schedule List hours of coverage: i.e., 0800-2000, or 8am -8pm.  
-*-** ... -... -..............
 
_ .........................
Position EOF Dose Assessor EOF Dose Assessor  
***--** EOF Dose Assessor EOF Dose Assessor (HPN) Field Monitoring Coordinator Radio Operator Enclosure 6.15 Emergency Planner Checklist DOSE ASSESSMENT AREA sRJO/ N2000I003 Page 6of14 24-HOUR POSITION EOF STAFFING LOG Primary Relief Name *Shift Name *Shift Schedule Schedule  
*--* List hours of coverage:
i.e., 0800-2000, or 8am -8pm.
Position.
Position.
Accident Assessment Interface Operations Interface (MNS and CNS only) Enclosure 6.15 Emergency Planner Checklist ACCrnENT ASSESSMENT AREA SR/0/ A/2000/003 Page 7of14 24-HOUR POSITION EOF STAFFING LOG Primary Relief Name *Shift Name 1'Shift Schedule Schedule
Accident Assessment Interface Operations Interface (MNS and CNS only).15 Emergency Planner Checklist ACCrnENT ASSESSMENT AREA SR/0/ A/2000/003 Page 7of14 24-HOUR POSITION EOF STAFFING LOG Primary Relief Name  
* List hours of coverage:
*Shift Name 1'Shift Schedule Schedule
i.e., 0800-2000, or Sam -8pm.
* List hours of coverage: i.e., 0800-2000, or Sam -8pm.  
-
 
Position Lead EOF Off-Site Agency Communicator EOF Off-Site Agency Communicator EOF Off-Site Agency Comn1unicator Enclosure 6.15 Emergency Planner Checklist OFFSJTEAGENCY COMMUNICATOR 24-HOUR POSITION EOF STAFFING LOG SR/0/ A/2000/003 Page 8of14 Primary Relief * -Name *Shift Name *Shift . Schedule Schedule List hours of coverage:
-~*~
i.e .. 0800-2000, or 8nm -8pm.
Position Lead EOF Off-Site Agency Communicator EOF Off-Site Agency Communicator EOF Off-Site Agency Comn1unicator.15 Emergency Planner Checklist OFFSJTEAGENCY COMMUNICATOR 24-HOUR POSITION EOF STAFFING LOG SR/0/ A/2000/003 Page 8of14 Primary Relief
-**--'-,,,,,,.,,,,,..,,.,.,.,,.m,
* Name  
_,,., Position EOF Services Manager EOF Services Adn1in/Commissary EOF Data Coordinator Enclosure 6.15 Emergency Plnnner Checklist EOF SERVICES AREA SR/0/ A/2000/003 Page 9of14 24-HOUR POSITION EOF STAFFING LOG Primar / Relief Name *Shift Name Schedule Schedule  
*Shift Name  
' ** List hours of coverage:
*Shift.
i.e., 0800-2000, or 8am -8pm.
Schedule Schedule  
Enclosure 6.15 SR/0/fV2000/003 Emergency Planner Checklist Page I 0 of 14 Name (Please Print) Representing Agency --*----**-*---*--**-*----
'~'
--------!------**--------
List hours of coverage: i.e.. 0800-2000, or 8nm -8pm.  
---------------**--*-----------
 
---!---*-------
,,,,,,.,,,,,..,,.,.,.,,.m, Position EOF Services Manager EOF Services Adn1in/Commissary EOF Data Coordinator.15 Emergency Plnnner Checklist EOF SERVICES AREA SR/0/ A/2000/003 Page 9of14 24-HOUR POSITION EOF STAFFING LOG Primar /
------------!
Relief Name  
----
*Shift Name  
_.......__
*~shift Schedule Schedule List hours of coverage: i.e., 0800-2000, or 8am -8pm.  
_____________________
.15 SR/0/fV2000/003 Emergency Planner Checklist Page I 0 of 14  
_
--------.----------------------~
Enclosure 6.15 Emergency Planner Checklist EOF FACILITY POST EVENT CHECKLIST SR/0/ A/2000/003 Page 11 of 14 .--.Obtain copy ofTSC/EOF Log Printout.
Name (Please Print)
NOTE: Retrieve:
Representing Agency
o Completed Procedures e Notes D Log Sheets ..
~---------------------~-------- ------
off video wall board using Supervisor XPanel (System power-Off).
------**~-*--
.15 Emergency Planner Checklist EOF FACILITY POST EVENT CHECKLIST SR/0/ A/2000/003 Page 11 of 14  
.--.Obtain copy ofTSC/EOF Log Printout.
NOTE:
Retrieve:
o Completed Procedures e
Notes D
Log Sheets  
.. ~Turn off video wall board using Supervisor XPanel (System power-Off).
EOF Services completes Enclosures 13.4 and 13.5 from procedure ST/O/ N4600/086.
EOF Services completes Enclosures 13.4 and 13.5 from procedure ST/O/ N4600/086.
Complete applicable enclosures of ST/O/ A/4600/086 to replenish procedure inventories Clean tables off Put all trash in containers Erase status boards Verify all multifunction machines have paper supply replenished Verify cordless phones are lell in cradles to be charged.
Complete applicable enclosures of ST/O/ A/4600/086 to replenish procedure inventories Clean tables off Put all trash in containers Erase status boards Verify all multifunction machines have paper supply replenished Verify cordless phones are lell in cradles to be charged.
Replenish Position Specific Notebooks (I copy of procedure body and minimum 3 copies or applicable enclosures, checklists and log sheets):
Replenish Position Specific Notebooks (I copy of procedure body and minimum 3 copies or applicable enclosures, checklists and log sheets):
EOF Director (also include minimum 3 copies each or Enclosure 6.2, 6.3 and 6.4) Radiological Assessment Manager (also include minimum 3 copies each of Enclosures 6.2, 6.3, and 6.4). EOF Dose Assessor Field Monitoring Coordinator Radio Operator EOF Offsite Agency Communicator (also include I copy of EP FAl'vl 3.15 Attachment 3.15.3.3)
EOF Director (also include minimum 3 copies each or Enclosure 6.2, 6.3 and 6.4)
Accident Assessment Manager (also include minimum 3 copies each of Enclosures 6.2, 6.3, and 6.4). Accident Assessment Interface EOF Operations Interface EOF Emergency Planner EOF Log Recorder (also include 1 copy of EP FAM 3.1 S Attachment 3.15.3.2)
Radiological Assessment Manager (also include minimum 3 copies each of Enclosures 6.2, 6.3, and 6.4).
EOF Data Coordinator EOF Services Manager Enclosure 6.15 Emergency Planner Checklist sRJ01 A/20001003 Page 12of14 MNS SECURITY EVENT, TSC/OSC ASSEMBLED AT EOF CHECKLIST
EOF Dose Assessor Field Monitoring Coordinator Radio Operator EOF Offsite Agency Communicator (also include I copy of EP FAl'vl 3.15 Attachment 3.15.3.3)
__ Notify Energy Center Building  
Accident Assessment Manager (also include minimum 3 copies each of Enclosures 6.2, 6.3, and 6.4).
: Security, 2-t 234, that TSC/OSC offsite responders are assembling at EOF. [61] __ Request that TSC/OSC responders assemble in EOF videoconferencing room. __ Coordinate selection of first response team that will activate TSC/OSC when Security Event is terminated.
Accident Assessment Interface EOF Operations Interface EOF Emergency Planner EOF Log Recorder (also include 1 copy of EP FAM 3.1 S Attachment 3.15.3.2)
__ Move first response team into EOF work area to obtain plant status and recovery strategies.
EOF Data Coordinator EOF Services Manager  
__ ..... IF ..... needed, THEN obtain copies ofRP/O/A/5700/012, Activation of the Technical Support Center, (TSC) and RP/O/A/5700/020.
.15 Emergency Planner Checklist sRJ01 A/20001003 Page 12of14 MNS SECURITY EVENT, TSC/OSC ASSEMBLED AT EOF CHECKLIST
Activation of the Operations Support Center (OSC), from the McGuire procedure cabinet.
__ Notify Energy Center Building Security, 2-t 234, that TSC/OSC offsite responders are assembling at EOF. [61]
__ Request that TSC/OSC responders assemble in EOF videoconferencing room.
__ Coordinate selection of first response team that will activate TSC/OSC when Security Event is terminated.
__ Move first response team into EOF work area to obtain plant status and recovery strategies.  
..... IF  
~ needed, THEN obtain copies ofRP/O/A/5700/012, Activation of the Technical Support Center, (TSC) and RP/O/A/5700/020. Activation of the Operations Support Center (OSC), from the McGuire procedure cabinet.
__ Determine 24-hour stalling for each TSC/OSC position.
__ Determine 24-hour stalling for each TSC/OSC position.
__ .... IF.._EOF videoconferencing room is too crowded.
IF.._EOF videoconferencing room is too crowded. THEN determine whether lo send TSC/OSC reliel'members to Energy Center Cafeteria.
THEN determine whether lo send TSC/OSC reliel'members to Energy Center Cafeteria.
WHEN Security Event is terminated and onsite TSC/OSC is to be activated. THEN ensure that first response team to TSC/OSC is briefed prior to dispatch to site.
WHEN Security Event is terminated and onsite TSC/OSC is to be activated.
__ Send relief TSC/OSC members home. if possible. with their assigned relief time.
THEN ensure that first response team to TSC/OSC is briefed prior to dispatch to site. __ Send relief TSC/OSC members home. if possible.
MNS BDBEE/ELAP EVENT, TSC/OSC ASSEMBLED AT EOF CHECKLIST {76}
with their assigned relief time. MNS BDBEE/ELAP EVENT, TSC/OSC ASSEMBLED AT EOF CHECKLIST  
__ Notify Energy Center Building Security at 2-1234 that TSC/OSC offsite responders are assembling at EOF.
{76} __ Notify Energy Center Building Security at 2-1234 that TSC/OSC offsite responders are assembling at EOF. __ Request that TSC/OSC responders assemble in EOF videoconferencing room. __ Assist TSC Emergency Planner in establishing priorities for transp011 of MNS ERO personnel to the site. __ Assist TSC Emergency Planner in determining 24-hour staffing for each TSC/OSC and alternate TSC/OSC position.  
__ Request that TSC/OSC responders assemble in EOF videoconferencing room.
--=IF .... needed, THEN obtain copies ofRP/O/A/5700/012, Activation of the Technical Support Center. (TSC) and RP/O/A/5700/020, Activation of the Operations Suppot1 Center (OSC), from the McGuire procedure cabinet.  
__ Assist TSC Emergency Planner in establishing priorities for transp011 of MNS ERO personnel to the site.
--=IF ..... EOF videoconferencing room is too crowded, THEN detennine whether to send TSC/OSC relief members to Energy Center Cafeteria.
__ Assist TSC Emergency Planner in determining 24-hour staffing for each TSC/OSC and alternate TSC/OSC position.  
-------
--=IF  
Enclosure 6.15 Emergency Planner Checklist SR/0/ N2000/003 Page 13of14 CNS SECURITY EVENT, TSC ERO ASSEMBLED AT EOF CHECKLIST
.... needed, THEN obtain copies ofRP/O/A/5700/012, Activation of the Technical Support Center. (TSC) and RP/O/A/5700/020, Activation of the Operations Suppot1 Center (OSC), from the McGuire procedure cabinet.  
__ Notify Energy Center Building  
--=IF  
: Security, 2-1234. that CNS TSC duty responders are assembling atEOF. [61] __ Have CNS TSC responders assemble in EOF videoconferencing room. __ Obtain RP/O/A/5000/020 Enclosure 4.20 from CNS procedure cabinet and distribute to assembled TSC ERO. --=IF._CNS TSC Emergency Planner does not respond within 75 minutes of declaration, THEN assist Assistant TSC Emergency Coordinator with assigned tasks. WHEN decision is made to access Catawba and staff the TSC and OSC, THEN ensure choice of facility (normal or alternate)
..... EOF videoconferencing room is too crowded, THEN detennine whether to send TSC/OSC relief members to Energy Center Cafeteria.  
TSC and OSC is known prior to TSC staff departure.
 
Enclosure 6.15 Emergency Planner Checklist SRJ01N2000/003 Page 14of14 EMERGENCY WORKERJSPECIAL EQUIPMENT RE-ENTRY AFTER ROAD BLOCKS ARE ESTABLISHED IN THE EPZ tOTE: TSC to work to if off si1i ft to .ive their personnel vehicles onsite and leave in the relief bus . . -*-------.-
----------------------------------~.15 Emergency Planner Checklist SR/0/ N2000/003 Page 13of14 CNS SECURITY EVENT, TSC ERO ASSEMBLED AT EOF CHECKLIST
-----***-
__ Notify Energy Center Building Security, 2-1234. that CNS TSC duty responders are assembling atEOF. [61]
___ __. 1.1 !E..roadblocks are in place in l 0 mile EPZ AND affected site's Emergency Planner has asked the EOF to prepare for emergency worker re-entry for on site relieC THEN perform the following:
__ Have CNS TSC responders assemble in EOF videoconferencing room.
__ Obtain RP/O/A/5000/020 Enclosure 4.20 from CNS procedure cabinet and distribute to assembled TSC ERO.  
--=IF._CNS TSC Emergency Planner does not respond within 75 minutes of declaration, THEN assist Assistant TSC Emergency Coordinator with assigned tasks.
WHEN decision is made to access Catawba and staff the TSC and OSC, THEN ensure choice of facility (normal or alternate) TSC and OSC is known prior to TSC staff departure.  
.15 Emergency Planner Checklist SRJ01N2000/003 Page 14of14 EMERGENCY WORKERJSPECIAL EQUIPMENT RE-ENTRY AFTER ROAD BLOCKS ARE ESTABLISHED IN THE EPZ t
OTE: TSC E;~~~~*gen~y Pl~1~1~~~~s to work wi~l~-RP-to deter~~ine if off ~oin~ si1i ft,~jj i-1~~ed to  
.ive their personnel vehicles onsite and leave in the relief bus.  
-----------~- -----***-
1.1  
!E..roadblocks are in place in l 0 mile EPZ AND affected site's Emergency Planner has asked the EOF to prepare for emergency worker re-entry for on site relieC THEN perform the following:
l.2 Request EOF Services Manager obtain bus( es) to be used for re-entry of relief workers.
l.2 Request EOF Services Manager obtain bus( es) to be used for re-entry of relief workers.
1.3 Coordinate with TSC Emergency Planner lo verify re-entry path to be used, working with Field Monitoring Coordinator and Radiological Assessment Manager to ensure the path selected avoids the plume foot print. 1.4 Coordinate with State representative at EOF to contact re-entry county EOC to obtain Highway Patrol escorts for bus. l .5 Ensure State representative requests counly EOC to notify roadblock selected for re-entry with Estimated Time of Arrival for the bus( cs) with Highway Patrol escort. 2.0 !E.roadblocks are NOT established.
1.3 Coordinate with TSC Emergency Planner lo verify re-entry path to be used, working with Field Monitoring Coordinator and Radiological Assessment Manager to ensure the path selected avoids the plume foot print.
THRN info1111 TSC Emergency Planner access will be normal. 3.1 IE.roadblocks are in place when special equipment is to be brought to plant. THEN use process in step 1.0 for equipment to pass through roadblock.
1.4 Coordinate with State representative at EOF to contact re-entry county EOC to obtain Highway Patrol escorts for bus.
Enclosure 6.16 EOF Log Recorder Checklist SR/0/ A/2000/003 Page 1 of 5 NOTE: Steps in this checklist may be perfonned in any order appropriate to the specific event conditions or they may be omitted if not applicable.
l.5 Ensure State representative requests counly EOC to notify roadblock selected for re-entry with Estimated Time of Arrival for the bus( cs) with Highway Patrol escort.
INITIAL NOTE: !.E.reporting to EOF outside yom normal work hours, THEN complete a Fitness for Duty Questionnaire.
2.0  
Don position badge Log in to PC Start Up main video wall D Double-click Supervisor XPanel on desktop D Click Duke Energy Logo D Click System Power D Click Power On D Click Wall Presets D Click Center Prest:!!
!E.roadblocks are NOT established. THRN info1111 TSC Emergency Planner access will be normal.
I Log in to WebEOC Sign in on Sign In board Refer to EP FAM Section 3.15. Attachment 3.15.3.2, for WebEOC Logging instructions.
3.1 IE.roadblocks are in place when special equipment is to be brought to plant. THEN use process in step 1.0 for equipment to pass through roadblock.  
.16 EOF Log Recorder Checklist SR/0/ A/2000/003 Page 1 of 5 NOTE:
Steps in this checklist may be perfonned in any order appropriate to the specific event conditions or they may be omitted if not applicable.
INITIAL NOTE:  
!.E.reporting to EOF outside yom normal work hours, THEN complete a Fitness for Duty Questionnaire.
Don position badge Log in to PC Start Up main video wall D Double-click Supervisor XPanel on desktop D Click Duke Energy Logo D Click System Power D Click Power On D Click Wall Presets D Click Center Prest:!! I Log in to WebEOC Sign in on Sign In board Refer to EP FAM Section 3.15. Attachment 3.15.3.2, for WebEOC Logging instructions.
Set up WebEOC content for display.
Set up WebEOC content for display.
0 Click on SITE PAR EPZ and open the file 0 Drag SITE PAR EPZ to right monitor AND maximize.
0 Click on SITE PAR EPZ and open the file 0 Drag SITE PAR EPZ to right monitor AND maximize.
o Under Slide Show Click dropdown beside "Show On" and select "Monitor I Generic PnP Monitor" o Select "From Begiiming" to place document in slideshow view D Click Significant Events Log. o Drag significant Events Log to the left monitor and maximize oThis is a template for initial set up of the video knowledge wall. *Views may be changed at the EOF Director's discretion.
o Under Slide Show tab~ Click dropdown beside "Show On" and select "Monitor I Generic PnP Monitor" o Select "From Begiiming" to place document in slideshow view D Click Significant Events Log.
* Remove EOF Sign-in after foll staffing is met. Site l (Main Video Wall):
o Drag significant Events Log to the left monitor and maximize oThis is a template for initial set up of the video knowledge wall.  
Enclosure 6.16 EOF Log Recorder Checklist sos --NF Significant Events Log Fission Product E Barrier Matrix Sign In Board -SRJO! A/2000/003 Page 2of5 PARs Off site Notification Status Make licker for Classification 0 Log in to Sidebar 0 Click on Perspectives D Double-Click Centcr_Preset_l (Enlarge as necessary but do NQI.maximize)
*Views may be changed at the EOF Director's discretion.
D Go back to Sidebar and Click on Decorators 0 Drng appropriate Site and Classification lo Significant Events Log screen on the Center Preset I window Make ticker for Next Time Out 0 Log in to Sidebar D Click on Perspectives 0 Double-Click Center_Preset_l (Enlarge as necessary but do NO.I.maximize)
* Remove EOF Sign-in after foll staffing is met.
D Click on Decorators D Drag Next Time Out to Significant Events Log screen on Center_Preset_I window (screen will show large gap between tickers; do N.QI..close gap) D Right-Click Next Time Out and select Properties D Click on Text tab in Properties D Highlight time (time only)and enter time for Next Time Out D Click Apply D Click OK IE.classification  
Site l (Main Video Wall):  
: changes, THEN update tickers for Classification and Next Time Out D Right-Click Site and Classification ticker on Center_Preset_l screen and delete ticker D Drag new Site and Classification to Significant Events Log screen on the Center_Preset_l window Update ticker for Next Time Out as requested by EOF Director D Right-Click Next Time Out and select Properties D Click on Text tab in Properties D Highlight time (time only)and enter time for Next Time Out D Click Apply D ClickOK -
.16 EOF Log Recorder Checklist sos NF Significant Events Log Fission Product E
Enclosure 6.16 EOF Log Recorder Checklist SR/0/ A/2000/003 Page 3of5 NOTE: These steps would be performed by additional Log Recorders for Site 2 or Site 3. IE.needed, THEN set up display for Site 2 or Site 3 D Log in to PC D Click Supervisor XPanel on desktop D Click Duke Energy Logo D Click System Power D Click Power On D Click Wall Presets D Click Right Preset I (Site 2) OR Lefi Preset I (Site 3) sos ENF Significant Events Log Log in to WebEOC Sign in on Sign In board Refer to EP FAM Section 3.15, Attachment 3.15.3.2, for WebEOC Logging instructions.
Barrier Matrix Sign In Board SRJO! A/2000/003 Page 2of5 PARs Off site Notification Status Make licker for Classification 0
Log in to Sidebar 0 Click on Perspectives D Double-Click Centcr_Preset_l (Enlarge as necessary but do NQI.maximize)
D Go back to Sidebar and Click on Decorators 0
Drng appropriate Site and Classification lo Significant Events Log screen on the Center Preset I window Make ticker for Next Time Out 0
Log in to Sidebar D Click on Perspectives 0
Double-Click Center_Preset_l (Enlarge as necessary but do NO.I.maximize)
D Click on Decorators D Drag Next Time Out to Significant Events Log screen on Center_Preset_I window (screen will show large gap between tickers; do N.QI..close gap)
D Right-Click Next Time Out and select Properties D Click on Text tab in Properties D Highlight time (time only)and enter time for Next Time Out D Click Apply D Click OK IE.classification changes, THEN update tickers for Classification and Next Time Out D Right-Click Site and Classification ticker on Center_Preset_l screen and delete ticker D Drag new Site and Classification to Significant Events Log screen on the Center_Preset_l window Update ticker for Next Time Out as requested by EOF Director D Right-Click Next Time Out and select Properties D Click on Text tab in Properties D Highlight time (time only)and enter time for Next Time Out D Click Apply D ClickOK  
.16 EOF Log Recorder Checklist SR/0/ A/2000/003 Page 3of5 NOTE:
These steps would be performed by additional Log Recorders for Site 2 or Site 3.
IE.needed, THEN set up display for Site 2 or Site 3 D Log in to PC D Click Supervisor XPanel on desktop D Click Duke Energy Logo D Click System Power D Click Power On D Click Wall Presets D Click Right Preset I (Site 2) OR Lefi Preset I (Site 3) sos ENF Significant Events Log Log in to WebEOC Sign in on Sign In board Refer to EP FAM Section 3.15, Attachment 3.15.3.2, for WebEOC Logging instructions.
Set up WebEOC content for display.
Set up WebEOC content for display.
D Click Significant Events Log D Drag to right screen and maximize Make ticker for Classification D Log in to Sidebar D Click Perspectives D Double-Click Right_Preset_l (Site 2) OR Left_Preset_l (Site 3) (Enlarge as necessary but do NOT maximize)
D Click Significant Events Log D Drag to right screen and maximize Make ticker for Classification D Log in to Sidebar D Click Perspectives D Double-Click Right_Preset_l (Site 2) OR Left_Preset_l (Site 3) (Enlarge as necessary but do NOT maximize)
D Go back to Sidebar and Click on Decorators D Drag appropriate Site and Classification to EN Form screen on the Right_Preset_l (Site 2) QB..Left_Preset_l (Site 3) window Make ticker for Next Time Out D Log in to Sidebar D Click on Perspectives D Double-Click Right_Preset_l (Site 2) OR Left_Preset_I (Site 3) (Enlarge as necessary but do NOT maximize)
D Go back to Sidebar and Click on Decorators D Drag appropriate Site and Classification to EN Form screen on the Right_Preset_l (Site 2)
D Click on Decorators D Drag Next Time Out to EN Form screen on Right_Preset_l (Site 2) .QR.Left_Preset_l (Site 3) window (screen will show large gap between tickers; do N.QI.close gap)
QB..Left_Preset_l (Site 3) window Make ticker for Next Time Out D Log in to Sidebar D Click on Perspectives D Double-Click Right_Preset_l (Site 2) OR Left_Preset_I (Site 3) (Enlarge as necessary but do NOT maximize)
--*** Enclosure 6.16 EOF Log Recorder Checklist D Right-Click Next Time Out and select Properties 0 Click on Texl tab in Properties D Highlight time (time only) and enter time for Next Time Out D Click Apply D Click OK SR/0/A/2000/003 Page 4 of 5 !E.classification  
D Click on Decorators D Drag Next Time Out to EN Form screen on Right_Preset_l (Site 2).QR.Left_Preset_l (Site
: changes, THEN update tickers for Classification and Next Time Out D Right-Click Site and Classification ticker on Right_Preset_I (Site 2) OR Left_Preset_I (Site 3) screen and delete ticker
: 3) window (screen will show large gap between tickers; do N.QI.close gap)  
* D Drag new Site and Classification to Significant Events Log screen on the Right_Prese!_I (Site 2) OR Left_Preset_l (Site 3)window Update ticker for Next Time Out as requested by EOF Director D Right-Click Next Time Out and select Properties D Click on Text tab in Properties D Highlight time (time only) and enter time for Next Time Out 0 Click Apply D Click OK INITIALS
 
___ _ NOTE: l. Incorrect log entries may be corrected by making the needed correction for the specific entry and flagging it as a "corrected item". 2. The EOF Log Recorder should enter EOF specific information and other information as directed by the EOF Director or Assistant EOF Director.  
--***.16 EOF Log Recorder Checklist D Right-Click Next Time Out and select Properties 0 Click on Texl tab in Properties D Highlight time (time only) and enter time for Next Time Out D Click Apply D Click OK SR/0/A/2000/003 Page 4 of 5  
: 3. Log activities must be detailed enough to "tell the story" if necessary to reconstruct events for the NRC and to have an effective turnover to EOF staff. __ Establish official log of all significant EOF activities and EOF Director decisions using WebEOC computer program sufficient to conduct turnover for the on-coming shift. { IER 13-10 Rec. 11.a} __ Log entries should include, but are not limited to, the following examples:  
!E.classification changes, THEN update tickers for Classification and Next Time Out D Right-Click Site and Classification ticker on Right_Preset_I (Site 2) OR Left_Preset_I (Site 3) screen and delete ticker D Drag new Site and Classification to Significant Events Log screen on the Right_Prese!_I (Site 2) OR Left_Preset_l (Site 3)window Update ticker for Next Time Out as requested by EOF Director D Right-Click Next Time Out and select Properties D Click on Text tab in Properties D Highlight time (time only) and enter time for Next Time Out 0 Click Apply D Click OK INITIALS ___ _
-EOF Director and any change in EOF Director (staffing)  
NOTE:
-Time of EOF activation  
: l. Incorrect log entries may be corrected by making the needed correction for the specific entry and flagging it as a "corrected item".
-Emergency classification, changes in classification.
: 2. The EOF Log Recorder should enter EOF specific information and other information as directed by the EOF Director or Assistant EOF Director.
time of declaration  
: 3. Log activities must be detailed enough to "tell the story" if necessary to reconstruct events for the NRC and to have an effective turnover to EOF staff.
-Protective Action Recommendations  
__ Establish official log of all significant EOF activities and EOF Director decisions using WebEOC computer program sufficient to conduct turnover for the on-coming shift. { IER 13-10 Rec. 11.a}
-Approval/transmittal of Emergency Notification Forms -Approval/distribution of News Releases  
__ Log entries should include, but are not limited to, the following examples:  
-Plant Conditions (Unit l. 2. and 3):
- EOF Director and any change in EOF Director (staffing)  
Enclosure 6.16 Ji30F' Log Recorder Checklist  
- Time of EOF activation  
-Core Cooling information (i.e., Time To Boiling, etc.) -Safety Systems Degraded  
- Emergency classification, changes in classification. time of declaration  
-Power Supply Status -Fission Product Barrier Degradation  
- Protective Action Recommendations  
-Radiation Releases  
- Approval/transmittal of Emergency Notification Forms  
-Procedures in effect and any transition to another procedure  
- Approval/distribution of News Releases  
-Actions taken that are not part of an approved procedure  
- Plant Conditions (Unit l. 2. and 3):  
-Any abnormal or unexpected plant response  
.16 Ji30F' Log Recorder Checklist  
-Major equipment manipulations  
- Core Cooling information (i.e., Time To Boiling, etc.)  
-Major mitigation actions taken -Site assembly, relocation, or evacuation of all or any part of the plant -Personnel Injuries  
- Safety Systems Degraded  
-Facility priorities  
- Power Supply Status  
-Recovery Action(s) in Progress  
- Fission Product Barrier Degradation  
-Summary offocilities briefings  
- Radiation Releases  
-Expected time of next Time-Out SRJ0/ A/2000/003 Page 5 of 5 -Any parameter that shows how drill/event is managed (ex.
- Procedures in effect and any transition to another procedure  
time, communication)
- Actions taken that are not part of an approved procedure  
- Any abnormal or unexpected plant response  
- Major equipment manipulations  
- Major mitigation actions taken  
- Site assembly, relocation, or evacuation of all or any part of the plant  
- Personnel Injuries  
- Facility priorities  
- Recovery Action(s) in Progress  
- Summary offocilities briefings  
- Expected time of next Time-Out SRJ0/ A/2000/003 Page 5 of 5  
- Any parameter that shows how drill/event is managed (ex. releases~ time, communication)
IE. WcbEOC computer program is not available, THEN establish manual log of all significant EOF e1ctivities and EOF Director decisions.
IE. WcbEOC computer program is not available, THEN establish manual log of all significant EOF e1ctivities and EOF Director decisions.
__ !E..requested by EOF Director.
__ !E..requested by EOF Director. THEN prepare sequence of events list and revise it as necessary.
THEN prepare sequence of events list and revise it as necessary.
__ Maintain EOF Director's Area displays and status bomds as directed or needed.
__ Maintain EOF Director's Area displays and status bomds as directed or needed. __ Record established priorities on EOF status board as requested by EOF Director.
__ Record established priorities on EOF status board as requested by EOF Director.
__ Conduct tumover for on-coming shift, if needed. Remove ticker for classification/next time-out.
__ Conduct tumover for on-coming shift, if needed.
D Log in to Side Bar D Click on Perspectives 0 Double-Click Center_Preset_
Remove ticker for classification/next time-out.
0 Right click the classification and click delete 0 Right click the Next Time Out and click delete Shut Down main video wall D Double-click Supervisor XPanel on desktop 0 Click Duke Energy Logo D Click System Power 0 Click Power Off __ Print copy of Incident Event Log. __ Provide all completed paperwork to Emergency Preparedness upon deactivation ofEOF.
D Log in to Side Bar D Click on Perspectives 0
Enclosure 6.17 EOF Data Coordinator Checklist SR/0/ A/2000/003 Page 1 of I NOTE: Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.
Double-Click Center_Preset_
INITIAL _ IF reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.
0 Right click the classification and click delete 0
__ Don position badge. __ Log in to PC __ Log in to WebEOC. __ Sign in on Sign In board. __ Establish Position Log of activities sufficient to conduct turnover for on-coming shift. Verify EOF computer  
Right click the Next Time Out and click delete Shut Down main video wall D Double-click Supervisor XPanel on desktop 0 Click Duke Energy Logo D Click System Power 0 Click Power Off
: hardware, soil ware. and data display equipment is operational per EP FAM 3 .8. EOF Data Coordinator's Reference Manual. ___ Provide computer support as required:  
__ Print copy of Incident Event Log.
** Software and hardware applications support o Data acquisition supp011 o Communication with TSC Data Coordinator
__ Provide all completed paperwork to Emergency Preparedness upon deactivation ofEOF.  
__ *Conduct turnover for on-coming if needed. __ Provide all completed paperwork to Emergency Preparedness upon deactivation of EOF. INITIALS
.17 EOF Data Coordinator Checklist SR/0/ A/2000/003 Page 1 of I NOTE:
___ _ PRINTED NAME ____________
Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.
_
INITIAL IF reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.
Enclosure 6.18 EOF Services Manager Checklist SR/0/ A/2000/003 Page I of 3 NOTE: Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted ifnot applicable.
__ Don position badge.
INITIAL __ IE.reporting to EOF outside your normal work 1-iours, THEN complete a Fitness for Duty Questionnaire.
__ Log in to PC
__ Don position badge. __ Log in to PC. __ Log in to WebEOC. Sign in on Sign In bonrd. Establish Position Log of activities sufficient to conduct turnover for on-coming shift. :-. ____ Obtain contact information for Global Risk Management and Insurance duty person to
__ Log in to WebEOC.
* provide to American Nuclear Insurers (ANI). ___ Obtain copy of most recent Emergency Notification Form. Notify ANI at 9-1-877-680-2644 within 120 minutes of an /\lerl or higher event declaration and provide answl!rs to Lhe following:
__ Sign in on Sign In board.
o What is your name (please spell your last name)? o What is the telephone number for immediate callback?
__ Establish Position Log of activities sufficient to conduct turnover for on-coming shift.
Verify EOF computer hardware, soil ware. and data display equipment is operational per EP FAM 3.8. EOF Data Coordinator's Reference Manual.
___ Provide computer support as required:
Software and hardware applications support o
Data acquisition supp011 o
Communication with TSC Data Coordinator
__ *Conduct turnover for on-coming shift~ if needed.
__ Provide all completed paperwork to Emergency Preparedness upon deactivation of EOF.
INITIALS ___ _
PRINTED NAME ____________ _  
.18 EOF Services Manager Checklist SR/0/ A/2000/003 Page I of 3 NOTE:
Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted ifnot applicable.
INITIAL
__ IE.reporting to EOF outside your normal work 1-iours, THEN complete a Fitness for Duty Questionnaire.
__ Don position badge.
__ Log in to PC.
__ Log in to WebEOC.
Sign in on Sign In bonrd.
Establish Position Log of activities sufficient to conduct turnover for on-coming shift.
:-. ____ Obtain contact information for Global Risk Management and Insurance duty person to provide to American Nuclear Insurers (ANI).
___ Obtain copy of most recent Emergency Notification Form.
Notify ANI at 9-1-877-680-2644 within 120 minutes of an /\\lerl or higher event declaration and provide answl!rs to Lhe following:
o What is your name (please spell your last name)?
o What is the telephone number for immediate callback?
11 What is the name of your facility?
11 What is the name of your facility?
* What is the name of your organization?
What is the name of your organization?
o What is the date and time of the event? o What is the extent of damage? o Briefly describe the nature of the event that you are rep01ting.
o What is the date and time of the event?
o What is the extent of damage?
o Briefly describe the nature of the event that you are rep01ting.
D Please provide contact person information (including the contact person's direct telephone nmnber(s) and their position within the organization) for ANI follow-up.
D Please provide contact person information (including the contact person's direct telephone nmnber(s) and their position within the organization) for ANI follow-up.
__ Document ANI notification in Position Log, including time and summary of information provided.
__ Document ANI notification in Position Log, including time and summary of information provided.
INITIALS
INITIALS ___ _
___ _ PRINTED NAME __________
PRINTED NAME __________  
_
.18.
Enclosure 6.18. EO!i' Services Manager Checklist SRIOI AJ2000/003 Page 2 of3 --* Activate the EOF Services Function by establishing duty function contacts for EOF service areas and post in EOF Service area: Administration/Commissary  
EO!i' Services Manager Checklist SRIOI AJ2000/003 Page 2 of3  
[SR/O/A/2000/003, Enclosure 6.11, EOF Services Administration/Commissary Checklist]
--* Activate the EOF Services Function by establishing duty function contacts for EOF service areas and post in EOF Service area:  
~
Administration/Commissary [SR/O/A/2000/003, Enclosure 6.11, EOF Services Administration/Commissary Checklist]
o Communications (24-hour number is 2-1961) [AD-EP-ALL-0107, Emergency Operations Facility (EOF) Services, Section 4.1 and Step 5.1]
o Communications (24-hour number is 2-1961) [AD-EP-ALL-0107, Emergency Operations Facility (EOF) Services, Section 4.1 and Step 5.1]
* Transportation Services  
Transportation Services [AD-EP-ALL-Ol 07, Emergency Operations Facility (EOF)
[AD-EP-ALL-Ol 07, Emergency Operations Facility (EOF) Services, Section 4.2 and Step 5.2]
Services, Section 4.2 and Step 5.2]
* Global Risk Management and Insurance  
Global Risk Management and Insurance [ AD-EP-ALL-0 l 07, Emergency Operations Facility (EOF) Services, Section 4.3]
[ AD-EP-ALL-0 l 07, Emergency Operations Facility (EOF) Services, Section 4.3]
Procurement [AD-EP-ALL-0107, Emergency Operations Facility (EOF) Services, Section 4.4 and Step 5.3]  
* Procurement  
-*-- Provide general administrative support and office supplies.
[AD-EP-ALL-0107, Emergency Operations Facility (EOF) Services, Section 4.4 and Step 5.3] -*--Provide general administrative support and office supplies.
__ Ensure office equipment is functioning properly.
__ Ensure office equipment is functioning properly.
NOTE: Personnel without badge access will need to be escorted into the EOF by the Assistant EOF Director.
NOTE:
EOF Emergency  
Personnel without badge access will need to be escorted into the EOF by the Assistant EOF Director. EOF Emergency Planner, EOF Services Manager, or their Mentor. [61)
: Planner, EOF Services  
__ !f..neecled. THEN provide escorted access to EOF l'or personnel without badge access. and document names of personnel escorted in log.  
: Manager, or their Mentor. [61) __ !f..neecled.
--*- Provide food and beverages to meet nutritional needs.
THEN provide escorted access to EOF l'or personnel without badge access. and document names of personnel escorted in log. --*-Provide food and beverages to meet nutritional needs. __ Provide facilities to meet personal needs (dining facilities.  
__ Provide facilities to meet personal needs (dining facilities. toilets, trash receptacles and disposal) as required.
: toilets, trash receptacles and disposal) as required.
NOTE:
NOTE: I. The INPO phone number may be obtained from the Consolidated Emergency Phone Directory for the Emergency Operations Facility (EOF). 2. The INPO Emergency Resources Manual provides a list of contacts at each US conunercial nuclear power site, and an emergency equipment list. The INPO Emergency Resources Manual can be found on the INPO Website or the bookcase in the EOF Director's Area. _ !E..needed, THEN perform the following:
I.
* Request Communications to troubleshoot and repair telephone  
The INPO phone number may be obtained from the Consolidated Emergency Phone Directory for the Emergency Operations Facility (EOF).
: systems, mobile radios and cell phones. a Request Transportation Services or others arrange for necessary equipment for movement of materials and perso1mel.
: 2.
The INPO Emergency Resources Manual provides a list of contacts at each US conunercial nuclear power site, and an emergency equipment list. The INPO Emergency Resources Manual can be found on the INPO Website or the bookcase in the EOF Director's Area.  
!E..needed, THEN perform the following:
Request Communications to troubleshoot and repair telephone systems, mobile radios and cell phones.
a Request Transportation Services or others arrange for necessary equipment for movement of materials and perso1mel.
o Request Transportation Services or others to a1Tange necessary equipment and perso1mel for debris removal in order to access the DEC nuclear sites. { IER L l-11-14}
o Request Transportation Services or others to a1Tange necessary equipment and perso1mel for debris removal in order to access the DEC nuclear sites. { IER L l-11-14}
* Obtain accommodations for personnel.
Obtain accommodations for personnel.  
Enclosure 6.18 EOF Services Manager Checklist SR/0/ A/2000/003 Page 3of3
.18 EOF Services Manager Checklist SR/0/ A/2000/003 Page 3of3 Request Global Risk Management and Insurance serve as liaison between Duke Energy and insurance companies in gathering data and establishing claims offices to disburse emergency assistance funds to evacuees.
* Request Global Risk Management and Insurance serve as liaison between Duke Energy and insurance companies in gathering data and establishing claims offices to disburse emergency assistance funds to evacuees.
Request Procurement coordinate all activities related to the purchase of materials, equipment and services from outside supplies including arranging for transportation and receiving as required.
* Request Procurement coordinate all activities related to the purchase of materials, equipment and services from outside supplies including arranging for transportation and receiving as required.
o Contact INPO for additional resources (human resources, emergency equipment, technical expertise). {75] {IER Ll-13-10}
o Contact INPO for additional resources (human resources, emergency equipment, technical expertise).  
ci IE.a Beyond Design Basis External Event (BDBEE)/Extended Loss of Off.site AC Power (ELAP) event al MNS, THEN request Transportation Services implement the MNS BDBEE/ELAP ERO Transportation Plan insert to the Fleet Storm EOF Manual. {76 j
{75] {IER Ll-13-10}
__ !E..24-hour staffing is required, THEN perfo1111 the following:
ci IE.a Beyond Design Basis External Event (BDBEE)/Extended Loss of Off.site AC Power (ELAP) event al MNS, THEN request Transportation Services implement the MNS BDBEE/ELAP ERO Transportation Plan insert to the Fleet Storm EOF Manual. {76 j __ !E..24-hour staffing is required, THEN perfo1111 the following:
o Notify additional personnel and arrange schedule for continuous support.
o Notify additional personnel and arrange schedule for continuous support.
o Conduct turnover for on-coming shift. ___ Ensure that all trash and left over food products are properly contained and arrange for disposal.
o Conduct turnover for on-coming shift.
___ Ensure that all trash and left over food products are properly contained and arrange for disposal.
Notify Facility Services to clean the EOF following deactivation.
Notify Facility Services to clean the EOF following deactivation.
Obtain Procedure ST/O/ A/4600/086.
Obtain Procedure ST/O/ A/4600/086. Standard Procedure for Periodic V crification of Communication Equipment Operation and Equipment/Supply Inventory. Enclosures 13.4 and 13.5 and complete checklists.
Standard Procedure for Periodic V crification of Communication Equipment Operation and Equipment/Supply Inventory.
Provide all completed paperwork to Emergency Preparedness upon deactivation ofEOF.
Enclosures 13.4 and 13.5 and complete checklists.
__ Notify duty functions contacts advising that the drill/event has been terminated.
Provide all completed paperwork to Emergency Preparedness upon deactivation ofEOF. __ Notify duty functions contacts advising that the drill/event has been terminated.
__ IE.needed, THEN perform the following:
__ IE.needed, THEN perform the following:
o Request Communications secure radio base stations.  
o Request Communications secure radio base stations.
"' Request Communications return po11able communications equipment to storage locations.
Request Communications return po11able communications equipment to storage locations.
o Request Procurement transfer information on outstanding requisitions to normal procurement contacts.
o Request Procurement transfer information on outstanding requisitions to normal procurement contacts.
0' Request Transportation Services return relocated equipment to original location.  
0' Request Transportation Services return relocated equipment to original location.
-. Request Transportation Services provide transportation home for ERO personnel.
Request Transportation Services provide transportation home for ERO personnel.
o Request Global Risk Management and Insurance notify insurance companies of change in drill/event status.
o Request Global Risk Management and Insurance notify insurance companies of change in drill/event status.  
INITIAL Enclosure 6.19 ESTABLISHING COMMUNICATIONS LINKS BETWEEN MCGUIRE SAMG EVALUATORS SR/0/ A/2000/003 Page l of 1 NOTE: Operations Procedure Support in the TSC will serve as the lead SAMG evaluator and will be assisted by Reactor Engineer and Systems Engineer in the TSC, as well as Accident Assessment Interface in the EOF. OPS Procedure Support is expected to direct the other evaluators in what they should be looking at strategically, plus ensure that SAEG-1 is completed appropriately as directed by the guidelines.
 
ESTABLISH communications links between the SAMO evaluators (TSC OPS Procedure  
INITIAL.19 ESTABLISHING COMMUNICATIONS LINKS BETWEEN MCGUIRE SAMG EVALUATORS SR/0/ A/2000/003 Page l of 1 NOTE:
: Support, TSC Reactor Engineer, TSC System Engineering  
Operations Procedure Support in the TSC will serve as the lead SAMG evaluator and will be assisted by Reactor Engineer and Systems Engineer in the TSC, as well as Accident Assessment Interface in the EOF. OPS Procedure Support is expected to direct the other evaluators in what they should be looking at strategically, plus ensure that SAEG-1 is completed appropriately as directed by the guidelines.
: Manager, and EOF Accident Assessment Interface) by dialing RP spare bridge 9-980-875-4833 (6-party bridge line). EVALUATE using an alternate bridge line listed below if for some reason the RP spare bridge is unavailable QLif other communications links are desired or needed. Dial the number listed as desired to determine if that bridge is currently being used. If the desired bridge line is not being used. then the appropriate parties may dial in to use it. EP Controller bridge (I 2 -party) 9-980-875-4575 McGuire site bridge (6 -party) 9-980-875-3030 McGuire site bridge (6 -party) 9-980-875-3200 INITIALS
ESTABLISH communications links between the SAMO evaluators (TSC OPS Procedure Support, TSC Reactor Engineer, TSC System Engineering Manager, and EOF Accident Assessment Interface) by dialing RP spare bridge 9-980-875-4833 (6-party bridge line).
___ _ PRINTED NAME __________
EVALUATE using an alternate bridge line listed below if for some reason the RP spare bridge is unavailable QLif other communications links are desired or needed. Dial the number listed as desired to determine if that bridge is currently being used. If the desired bridge line is not being used. then the appropriate parties may dial in to use it.
EP Controller bridge (I 2 - party) 9-980-875-4575 McGuire site bridge (6 - party) 9-980-875-3030 McGuire site bridge (6 - party) 9-980-875-3200 INITIALS ___
PRINTED NAME __________  


Enclosure 6.20 Oconee Recovery SRJO/ A/2000/003 Page I of 2 1. Recovery Guidelines The Recovery Manager shall be responsible for the following:
-----------------------------------------~.20 Oconee Recovery SRJO/ A/2000/003 Page I of 2
: 1. Recovery Guidelines The Recovery Manager shall be responsible for the following:
D I.I D 1.2 Initiate RP/O/B/1000/027, Reentry Recovery Procedure.
D I.I D 1.2 Initiate RP/O/B/1000/027, Reentry Recovery Procedure.
Announce as follows:  
Announce as follows:  
"Agreement has been reached between Duke Energy, the State of South Carolina and the NRC that the General Emergency classification is terminated.
"Agreement has been reached between Duke Energy, the State of South Carolina and the NRC that the General Emergency classification is terminated. Recovery Operations are being initiated at the site. Actions are underway to determine when people who have been evacuated from their homes can return. As this information is made available, it will be released to the public."
Recovery Operations are being initiated at the site. Actions are underway to determine when people who have been evacuated from their homes can return. As this information is made available, it will be released to the public."
i'TOTE: - The offsit~--~ecovery orga~~;;,;~ti~;~ wiJ(~tay at tf~e*l:~-()j::-nncT~~~rl~ with the counties and state Jl**
i'TOTE: -The at with the counties and state Jl** radiological Conditions exiSt beyond the ONS site boundary.
radiological Conditions exiSt beyond the ONS site boundary. The onsite recovei-y 1
The onsite recovei-y 1 organization will be established by the Emergency  
organization will be established by the Emergency C~oordinator.
-O 1.3 Establish Recovery Organization to handle olTsite consequences.
O 1.3 Establish Recovery Organization to handle olTsite consequences.
D 1.4 Make the f'ollowing assignments:
D 1.4 Make the f'ollowing assignments:
Recovery Manager Radiological Assessment Manager Field Monitoring Coordinator Emergency Preparedness Manager EOF Services Manager D 1.5 Ensure staffing for long-term operation.
Recovery Manager Radiological Assessment Manager Field Monitoring Coordinator Emergency Preparedness Manager EOF Services Manager D 1.5 Ensure staffing for long-term operation.
NOTE: Once recovery has been determined, the emergency notification message forms are no longer used. D 1.6 Confor with SEMO (State Emergency Management Director) regarding work in progress at EOF and determine communication channels and notifications expected.
NOTE:
TNITIALS PRINTED NAME 0 1.7 0 1.8 Enclosure 6.20 Oconee Recovery Consult with each manager regarding activities in progress.
Once recovery has been determined, the emergency notification message forms are no longer used.
D 1.7.l Radiological Assessment Responsibilities Provide ingestion pathway dose assessments SR/0/ A/2000/003  
D 1.6 Confor with SEMO (State Emergency Management Director) regarding work in progress at EOF and determine communication channels and notifications expected.
.Page 2of2 o Provide ongoing communications with DHEC Nuclear Emergency Preparedness c Evaluate environmental concentrations within the radiological footprint o Provide technical assistance to Joint Information Center o Help plan for reactor building purge as needed 0 I. 7 .2 Emergency Preparedness Responsibilities o Communications to the State and County Management Directors O 1.7.3. EOF Services Manager Responsibilities o Ensure AN! (insurance) is set up for public inquiry c Provide services as required D 1.7.4. Joint Information Center Responsibilities o Providing news releases  
TNITIALS PRINTED NAME ~~~~~~~~~~~~~~
!).. Work with media/public to reduce rumors o Monitoring information being released by news media Maintain Emergency Operations Facility activated and staffed until consensus is reached by Duke Energy and State of South Carolina there is no basis for continuous staffing.
 
0 1.8.1 Record time and date that Emergency Operations Facility/Joint Information Center were closed. A. EOF/JIC Closed--------
0 1.7 0 1.8.20 Oconee Recovery Consult with each manager regarding activities in progress.
TimciDate NOTE: Enclosure 6.21 Keowec Hydro Project Dams/Dikes Imminent Failure/Potential Failure Descriptions s1u01 A/20001003 Pagel of l Duke Energy Hydro Group personnel are responsible for evaluation/inspection of Keowee Hydro Project Dams/Dikes AND determining if an Imminent Failure or Potential Failure exists.
D 1.7.l Radiological Assessment Responsibilities  
* Duke Energy Hydro Group personnel will communicate the results of evaluations/inspections to the Keowee Hydro Operator.
~
The Keowee Hydro Operator will notify the SM. l. Imminent Failure The Imminent Failure emergency level indicates that time has run out, and the dam has failed, is foiling, or is about to fail. Imminent Failure typically involves a continuing and progressive loss of material from the dam. It is not usually possible to determine how long a complete breach of a dam will take. Therefore.
Provide ingestion pathway dose assessments SR/0/ A/2000/003  
once a decision is made that there is no time to prevent failure.
.Page 2of2 o
the Imminent Failure warning must be issued. For purposes of evacuation.
Provide ongoing communications with DHEC Nuclear Emergency Preparedness c
emergency management authorities should assume the worst-case condition that failure has already occurred.  
Evaluate environmental concentrations within the radiological footprint o
(Duke Energy Elcctric Plant f:'.'.AP)  
Provide technical assistance to Joint Information Center o
: 2. Potential Failure The Potential Failure emergency level indicates that conditions arc developing at the dam that could lead to a dam failure.
Help plan for reactor building purge as needed 0 I. 7.2 Emergency Preparedness Responsibilities o
Some examples are (I) rising reservoir levels that are approaching the top of the non-overflow section of the dam, (2) transverse cracking of an embankment, and (3) a verified bomb threat. Potential Failure should convey that time is available for analyses, decisions, and actions before the dam could fail. A failure may occur, but predetermined response actions may moderate or alleviate failure.
Communications to the State and County Management Directors O 1.7.3.
fNITIALS
EOF Services Manager Responsibilities o
___ _ PRINTED NAME ________
Ensure AN! (insurance) is set up for public inquiry c
_
Provide services as required D 1.7.4.
Enclosure 6.22 EOF Evacuation Checklist sRJ01 A12ooo;oo3 Page I of2 ----I.E..conditions DO NOT allow for a controlled relocation of the facility.
Joint Information Center Responsibilities o
THEN perform immediate actions to protect personnel.
Providing news releases  
!)..
Work with media/public to reduce rumors o
Monitoring information being released by news media Maintain Emergency Operations Facility activated and staffed until consensus is reached by Duke Energy and State of South Carolina there is no basis for continuous staffing.
0 1.8.1 Record time and date that Emergency Operations Facility/Joint Information Center were closed.
A. EOF/JIC Closed--------
TimciDate  
 
NOTE:.21 Keowec Hydro Project Dams/Dikes Imminent Failure/Potential Failure Descriptions s1u01 A/20001003 Pagel of l Duke Energy Hydro Group personnel are responsible for evaluation/inspection of Keowee Hydro Project Dams/Dikes AND determining if an Imminent Failure or Potential Failure exists.
Duke Energy Hydro Group personnel will communicate the results of evaluations/inspections to the Keowee Hydro Operator. The Keowee Hydro Operator will notify the SM.
: l. Imminent Failure The Imminent Failure emergency level indicates that time has run out, and the dam has failed, is foiling, or is about to fail. Imminent Failure typically involves a continuing and progressive loss of material from the dam. It is not usually possible to determine how long a complete breach of a dam will take. Therefore. once a decision is made that there is no time to prevent failure. the Imminent Failure warning must be issued. For purposes of evacuation. emergency management authorities should assume the worst-case condition that failure has already occurred. (Duke Energy Hydro-Elcctric Plant f:'.'.AP)
: 2. Potential Failure The Potential Failure emergency level indicates that conditions arc developing at the dam that could lead to a dam failure. Some examples are (I) rising reservoir levels that are approaching the top of the non-overflow section of the dam, (2) transverse cracking of an embankment, and (3) a verified bomb threat. Potential Failure should convey that time is available for analyses, decisions, and actions before the dam could fail. A failure may occur, but predetermined response actions may moderate or alleviate failure.
fNITIALS ___ _
PRINTED NAME ________ _  
.22 EOF Evacuation Checklist sRJ01 A12ooo;oo3 Page I of2  
---- I.E..conditions DO NOT allow for a controlled relocation of the facility. THEN perform immediate actions to protect personnel.
A. Notify personnel to re-assemble o Mint Street Parking Deck (Primary) o Fire bird Statue in front of Bechtler Museum (Alternate)
A. Notify personnel to re-assemble o Mint Street Parking Deck (Primary) o Fire bird Statue in front of Bechtler Museum (Alternate)
B. Notify the TSC Emergency Coordinator of actions taken
B. Notify the TSC Emergency Coordinator of actions taken
* Catawba 803-701-5870  
* Catawba 803-701-5870
: o. McGuire 980-875-4950 o Oconee 864-873-3921
: o. McGuire 980-875-4950 o Oconee 864-873-3921
____ I.E..conditions allow for a controlled relocation of the facility, determine alternate EOF location:
____ I.E..conditions allow for a controlled relocation of the facility, THl~N determine alternate EOF location:
o Catawba Event -McGuire Alternate TSC o McGuire Event -Catawba Alternate TSC o Oconee Event -Catawba Alternate TSC Request EOF Emergency Planner to obtain the following:
o Catawba Event - McGuire Alternate TSC o McGuire Event - Catawba Alternate TSC o Oconee Event - Catawba Alternate TSC Request EOF Emergency Planner to obtain the following:
a 24-1-Iour Position EOF Staffing Log o EOF Business Continuity Plan o Catawba.
a 24-1-Iour Position EOF Staffing Log o
McGuire.
EOF Business Continuity Plan o
and Oconee Emergency Telephone Directories o ERO Member Contact Information notebook
Catawba. McGuire. and Oconee Emergency Telephone Directories o
ERO Member Contact Information notebook
___ Announce to EOF personnel to exit EOF and move to assembly area (Location designated by EOF Director) with all their procedures and paperwork.
___ Announce to EOF personnel to exit EOF and move to assembly area (Location designated by EOF Director) with all their procedures and paperwork.
o Mint Street Parking Deck (Primary) o Firebird Statue in front of Bechtler Museum (Alternate)
o Mint Street Parking Deck (Primary) o Firebird Statue in front of Bechtler Museum (Alternate)
____ Consider the need to escort NRC and offsite agency personnel from EOF to alternate EOF. ____ Turn over command and control of event to TSC Emergency Coordinator.
____ Consider the need to escort NRC and offsite agency personnel from EOF to alternate EOF.
o Notify TSC Emergency Coordinator that EOF is evacuating due to (state reason) o Catawba 803-701-5870 o McGuire 980-875-4950 o Oconee 864-873-3921
____ Turn over command and control of event to TSC Emergency Coordinator.
* Provide TSC Emergency Coordinator current emergency classification and EAL number, cun-ent Protective Action Recommendations:
o Notify TSC Emergency Coordinator that EOF is evacuating due to (state reason) o Catawba 803-701-5870 o
and status of Emergency Notifications:
McGuire 980-875-4950 o
Message number due at ___ _ ____ Request the EOF Emergency Planner call the TSC Emergency Planner to request he call the unaffected site's control room and make them aware of the EOF relocation.
Oconee 864-873-3921 Provide TSC Emergency Coordinator current emergency classification and EAL number, cun-ent Protective Action Recommendations: and status of Emergency Notifications: Message number due at ___ _
* Enclosure 6.22 EOF Evacuation Checklist NOTE: The following actions are taken after exiting the EOF. SR/0/ A/2000/003 Page 2 of2 Request leads in each EOF fonctional area perform accountability of EOF perso1mel using 24 hour EOF Posilion Staffing Log. Consult with Enterprise Security console personnel al 704-382-1234 to determine expected duration of EOF evacuation.  
____ Request the EOF Emergency Planner call the TSC Emergency Planner to request he call the unaffected site's control room and make them aware of the EOF relocation. *
.22 EOF Evacuation Checklist NOTE: The following actions are taken after exiting the EOF.
SR/0/ A/2000/003 Page 2 of2 Request leads in each EOF fonctional area perform accountability of EOF perso1mel using 24 hour EOF Posilion Staffing Log.
Consult with Enterprise Security console personnel al 704-382-1234 to determine expected duration of EOF evacuation.  
!E.expected duration of evacuation is greater than 2 hours or unknown, THEN perform the following:
!E.expected duration of evacuation is greater than 2 hours or unknown, THEN perform the following:
* Direct EOF Personnel to report to the Alternate EOF Location c'i Catawba Alternate TSC Catawba Nuclear Station Administration Building (Building 7720) 4800 Concord Road York. SC 29745-9635 o McGuire Alternate TSC McGuire Nuclear Station Administration Building (Building 7438) 12700 !lagers Ferry Road Huntersville.
Direct EOF Personnel to report to the Alternate EOF Location c'i Catawba Alternate TSC Catawba Nuclear Station Administration Building (Building 7720) 4800 Concord Road York. SC 29745-9635 o McGuire Alternate TSC McGuire Nuclear Station Administration Building (Building 7438) 12700 !lagers Ferry Road Huntersville. NC 28078-9340 o
NC 28078-9340 o Inform the TSC Emergency Coordinator that EOF is relocating to Alternate EOF Location o Request TSC notify NRC of EOF relocation Direct EOF Emergency Planner to conduct actions required by EOF Business Continuity Plan. Return to Enclosure 6.1 of this procedure after reporting to Alternate EOF.
Inform the TSC Emergency Coordinator that EOF is relocating to Alternate EOF Location o
Enclosure 6.23 EOF Briefing Guideline SR/0/ A/2000/003 Page 1 of 2 NOTE: Items listep here are suggested topics for routine update briefings (not all topics need be addressed at each briefing).
Request TSC notify NRC of EOF relocation Direct EOF Emergency Planner to conduct actions required by EOF Business Continuity Plan.
Items actually selected should be based on existing or projected plant conditions and current priorities.
Return to Enclosure 6.1 of this procedure after reporting to Alternate EOF.  
Attributes of Excellent Briefings o 5-10 minutes duration o Brief for status, not to solve problems
.23 EOF Briefing Guideline SR/0/ A/2000/003 Page 1 of 2 NOTE: Items listep here are suggested topics for routine update briefings (not all topics need be addressed at each briefing). Items actually selected should be based on existing or projected plant conditions and current priorities.
* Crisp, focused and well controlled
Attributes of Excellent Briefings o
* Speak to be heard (use PA i r needed) ** Repeal back required actions o ALL personnel are attentive  
5-10 minutes duration o
*----------'--------------*---------l  
Brief for status, not to solve problems Crisp, focused and well controlled Speak to be heard (use PA i r needed)  
: 1. EO F Director (open and lead briefing)  
** Repeal back required actions o
*o: Pre-announce  
ALL personnel are attentive  
--5 n1inute \:Var11ing brief is about to occur '
*----------'--------------*---------l
* Start Briefing by stating "Attention in the EOF." observe participants to confirm they are ready of emergency conditions "Station priorities o Offsite actions being taken o NRC activities related lo emergency Notes:
: 1.
i--------------*-------------------*--------*---------------;  
EO F Director (open and lead briefing)  
: 2. Assistant EOF Director o Facility staffing issues and status or additional support requested o Facility operations expectations (noise levels. procedure use. log keeping.
*o: Pre-announce -- 5 n1inute \\:Var11ing brief is about to occur
etc.) o Status of offsite agency communications o Status of relief shift Notes:  
* Start Briefing by stating "Attention in the EOF." observe participants to confirm they are ready  
: 3. Accident Assessment Manager o Cu1Tent Emergency Classification and EAL number/description o Key parameters/potential paths for Emergency Classification Upgrade o Reactor condition, core damage assessment.
~Overview of emergency conditions "Station priorities o Offsite actions being taken o NRC activities related lo emergency Notes:  
o Review of key plant conditions (power level. shutdown, trends) o Fission Product Barrier Status, trends, prognosis
~-------------------------------~
* Core Cooling System Status o Emergency/abnonnal procedures entered or exited
i--------------*-------------------*--------*---------------;
* Severe accident guideline status o. Status ofNRC Conununications Notes:
: 2.
,.....__.
Assistant EOF Director o
: 4. r---5. 6. 7. 8. 9. 10. Enclosure 6.23 EOF Briefing Guideline SRJO/ A/2000/003 Page 2 of2 Radiological Assessment Manager 0 Status of radiological release compared to EAL thresholds, dose projections.
Facility staffing issues and status or additional support requested o
offsite radiological conditions, PARs. 0 Meteorological conditions
Facility operations expectations (noise levels. procedure use. log keeping. etc.)
* Field Monitoring Team reports 0 Radiation Protection problem areas being worked and/or needing resolution o* Chemistry activities and resulls.  
o Status of offsite agency communications o
(e.g. dose equivalent iodine. sample status) Notes: Emergency Planner 'Ii: !E..a security event is in progress, THEN plant access restrictionst status of site security, offsite Local Law Enforcement Agencies assistance requested and/or provided e IF a medical emergency response (MERT) is in progress, THEN number of victims, whether radiologically or chemically contaminated, offsite EMS response 0 !E.a fire response is in progress, THEN status of fire, offsite FD response
Status of relief shift Notes: ~-----~~---~-~~~~~-~~~~~-~~-~--~--
* Status of site assembly and site evacuation Notes: Offsitc Agency Communicator 0 Status or offsite agency communications and time next message due .. Status of TNPO notification Notes: -EOF Log Recorder
: 3.
* Items of interest from TSC Log ... TSC Priorities Notes: Corporate Communications G Status of news releases and press conferences 0 Rumors being addressed 0 Internal/External notifications made (Duke Energy leadership ECOC. JIC, state government)
Accident Assessment Manager o
Notes: (IF present)
Cu1Tent Emergency Classification and EAL number/description o
Offsite Agencies Q Discuss status of offsite agency actions EOF Director (close briefing)  
Key parameters/potential paths for Emergency Classification Upgrade o
<o IF the NRC is present, THEN provide them with opportunity to contribute to brief o. Ask if any others need to rcpo11 "Important information" 0 Summarize priorities
Reactor condition, core damage assessment.
* Ask if there are any questions
o Review of key plant conditions (power level. shutdown, trends) o Fission Product Barrier Status, trends, prognosis Core Cooling System Status o
* State "END OF BRIEF" --
Emergency/abnonnal procedures entered or exited Severe accident guideline status
INITIAL Enclosure 6.24 Setup of Catawba Alternate EOF in McGuire Achnin Bldg. SR/0/ A/2000/003 Page 1 of 3 --=IF-.SpectraLink phones with headsets can be obtained from McGuire TSC, THEN take them to alternate EOF location (Administration Building layout on Page 3 of3 of this enclosure).
: o.
__ Locate assigned Administration Building area shown on the layout drawing on Page 3 of 3 of this enclosure NOTE: I. Alternate TSC phone sets are stored in the CRX Equipment Room, Room 112. 2. The EOF Emergency Planner and EOF Data Coordinator can assist with phone and computer connections.  
Status ofNRC Conununications Notes: ~--~~~~~~~-~~~~-~~~~~~~~~~~~~~~~~
: 3. !E..a computer is needed, THEN a computer that is not being used for another ERO function (e.g., Regulatory Compliance  
: 4.
: section, Business Management group, Human Resources group) may be used. 4. !E..access to the CBX equipment Room, Room 112, is needed prior to the arrival of the EOF Emergency Planner.
r---
THEN a key to the door can be obtained from Security at the SAS. 5. Printer paths for McGuire Nuclear Station Administration Building Mail Room Printers are MNADMI06 and MNADMDPl.
: 5.
: 6.
: 7.
: 8.
: 9.
: 10..23 EOF Briefing Guideline SRJO/ A/2000/003 Page 2 of2 Radiological Assessment Manager 0
Status of radiological release compared to EAL thresholds, dose projections. offsite radiological conditions, PARs.
0 Meteorological conditions Field Monitoring Team reports 0
Radiation Protection problem areas being worked and/or needing resolution o*
Chemistry activities and resulls. (e.g. dose equivalent iodine. sample status)
Notes:
Emergency Planner  
'Ii:  
!E..a security event is in progress, THEN plant access restrictionst status of site security, offsite Local Law Enforcement Agencies assistance requested and/or provided e
IF a medical emergency response (MERT) is in progress, THEN number of victims, whether radiologically or chemically contaminated, offsite EMS response 0  
!E.a fire response is in progress, THEN status of fire, offsite FD response Status of site assembly and site evacuation Notes:
Offsitc Agency Communicator 0
Status or offsite agency communications and time next message due Status of TNPO notification Notes:
EOF Log Recorder Items of interest from TSC Log TSC Priorities Notes:
Corporate Communications G
Status of news releases and press conferences 0
Rumors being addressed 0
Internal/External notifications made (Duke Energy leadership team~ ECOC. JIC, state government)
Notes:
(IF present) Offsite Agencies Q
Discuss status of offsite agency actions EOF Director (close briefing)  
<o IF the NRC is present, THEN provide them with opportunity to contribute to brief
: o.
Ask if any others need to rcpo11 "Important information" 0
Summarize priorities Ask if there are any questions State "END OF BRIEF"  
 
INITIAL.24 Setup of Catawba Alternate EOF in McGuire Achnin Bldg.
SR/0/ A/2000/003 Page 1 of 3  
--=IF-.SpectraLink phones with headsets can be obtained from McGuire TSC, THEN take them to alternate EOF location (Administration Building layout on Page 3 of3 of this enclosure).
__ Locate assigned Administration Building area shown on the layout drawing on Page 3 of 3 of this enclosure NOTE:
I. Alternate TSC phone sets are stored in the CRX Equipment Room, Room 112.
: 2. The EOF Emergency Planner and EOF Data Coordinator can assist with phone and computer connections.
: 3. !E..a computer is needed, THEN a computer that is not being used for another ERO function (e.g., Regulatory Compliance section, Business Management group, Human Resources group) may be used.
: 4. !E..access to the CBX equipment Room, Room 112, is needed prior to the arrival of the EOF Emergency Planner. THEN a key to the door can be obtained from Security at the SAS.
: 5. Printer paths for McGuire Nuclear Station Administration Building Mail Room Printers are MNADMI06 and MNADMDPl.
__ Set up assigned location as follows:
__ Set up assigned location as follows:
o Obtain phone equipment necessary to conduct ERO function at assigned location and connect to wall and ceiling outlets.
o Obtain phone equipment necessary to conduct ERO function at assigned location and connect to wall and ceiling outlets.
o IF a computer is needed, THEN request help from EOF Data Coordinator.
o IF a computer is needed, THEN request help from EOF Data Coordinator.
o IF necessary, THEN obtain copies of position procedure enclosure from procedure SRJO/B/2000/003, Activation of the EOF, located in Emergency Preparedness Procedures cabinet.
o IF necessary, THEN obtain copies of position procedure enclosure from procedure SRJO/B/2000/003, Activation of the EOF, located in Emergency Preparedness Procedures cabinet.
o !E..printing capability is needed, THEN setup printers using DAE Printer Selector Program.
o  
INITIALS PRINTED NAME ___________
!E..printing capability is needed, THEN setup printers using DAE Printer Selector Program.
_
INITIALS PRINTED NAME ___________ _  
Enclosure 6.24 Setup of Catawba Alternate EOF in McGuire Admin Bldg. SR/0/ A/2000/003 Page 2of3 o LE.copies of plant procedures are required, THEN perform one of the following:
.24 Setup of Catawba Alternate EOF in McGuire Admin Bldg.
* For Emergency Plan Implementing Procedures (RPs, SI-Is, and SRs), make copy from Control Copy located in Emergency Preparedness Procedures cabinet.
SR/0/ A/2000/003 Page 2of3 o
* For all other procedures, print a copy from Fusion on DAE using McGuire Admin Building Mail Room printer MNADM106 or MNADMDPI.
LE.copies of plant procedures are required, THEN perform one of the following:
o Assume or continue ERO role according to procedure SR/O/B/2000/003, Activation of the EOF.
For Emergency Plan Implementing Procedures (RPs, SI-Is, and SRs), make copy from Control Copy located in Emergency Preparedness Procedures cabinet.
Enclosure 6.24 Setup of Catawba Alternate EOF in McGuire Admin Bldg. STUO/ A/2000/003 Page 3 of 3 (Executive Board Room 111, Admin. Building)
For all other procedures, print a copy from Fusion on DAE using McGuire Admin Building Mail Room printer MNADM106 or MNADMDPI.
RX l'h)Sics 4962 NC 4954 875-1955 SC PC 4968 875-4778 (ENSJ 875-4788 (RSCLJ 4959 RAM EOF Position Locations OPS Interface AAI AAM c 4951 4520 875-4789{PMCLJ 875*l770(HPNJ PC 875-1'!53 EOF Log Recorder 0 Others (EP Room 114) -*4458. *4977. *875-1951.
o Assume or continue ERO role according to procedure SR/O/B/2000/003, Activation of the EOF.  
.24 Setup of Catawba Alternate EOF in McGuire Admin Bldg.
STUO/ A/2000/003 Page 3 of 3 (Executive Board Room 111, Admin. Building)
RX l'h)Sics 4962 NC 4954 875-1955 SC PC 4968 875-4778 (ENSJ 875-4788 (RSCLJ 4959 RAM  
~Hhcr EOF Position Locations OPS Interface AAI AAM c
4951 4520 875-4789{PMCLJ 875*l770(HPNJ PC 875-1'!53 EOF Log Recorder 0
Others (EP Room 114) - *4458. *4977. *875-1951.
4950 Emcrgcnc)
4950 Emcrgcnc)
Planner . Ringuown  
Planner  
* *; Phone lo EOF EOF Dir . Ringdown Phone lo OSC *2211 e Off site Communicator (EP Room 1158 --*4970. *SSN 315. *Radio. *875-1951.
. Ringuown  
o Data Coordinator (CBX Equipment Room I I 2) --*4999. o Dose Assessor (SCR Room I OOD) --*4405. 11 Off site Monitoring (McGuire TSC) *4969. *4976 o Public Affairs (Rooms I I 8 and 141) --*4400. *4402, *4233. o NRC (NRC Room 126) --* 875-1681.
* *; Phone lo EOF EOF Dir  
o Other, use Jaguar Room as needed (Room 144, EOF Services Mgr.) --*4826. Office Equipment FAX (Mail Room, Room 116) --*875-4506.
. Ringdown Phone lo OSC  
o FAX (EP Room 114) --*875-4382.
*2211 e
o Copier (Mail Room, Room 116). o Copier (SA Room 170). o CBX (CBX Office inAdmin.
Off site Communicator (EP Room 1158 -- *4970. *SSN 315. *Radio. *875-1951.
Building Lobby).
o Data Coordinator (CBX Equipment Room I I 2) -- *4999.
* Indicates existing phones. All others are to be plugged in when the Alternate TSC is activated.
o Dose Assessor (SCR Room I OOD) -- *4405.
Enclosure 6.25 sRJO/ A/2000/003 Setup of McGuire or Oconee Alternate EOF in Page I of 3 Catawba Admin Bldg. INITIAL IF SpectraLink phones with headsets can be obtained from Cata\vba TSC, THEN take them to __ alternate EOF location (Administration Building layout on Page 2of3 of this enclosure).
11 Off site Monitoring (McGuire TSC) *4969. *4976 o
Public Affairs (Rooms I I 8 and 141) -- *4400. *4402, *4233.
o NRC (NRC Office~ Room 126) --
* 875-1681.
o Other, use Jaguar Room as needed (Room 144, EOF Services Mgr.) -- *4826.
Office Equipment  
~
FAX (Mail Room, Room 116) -- *875-4506.
o FAX (EP Room 114) -- *875-4382.
o Copier (Mail Room, Room 116).
o Copier (SA Room 170).
o CBX (CBX Office inAdmin. Building Lobby).
* Indicates existing phones. All others are to be plugged in when the Alternate TSC is activated.  
.25 sRJO/ A/2000/003 Setup of McGuire or Oconee Alternate EOF in Page I of 3 Catawba Admin Bldg.
INITIAL IF SpectraLink phones with headsets can be obtained from Cata\\vba TSC, THEN take them to
__ alternate EOF location (Administration Building layout on Page 2of3 of this enclosure).
__ Locate assigned Administration Building area shown on the layout drawing on Page 2 of 3 of this enclosure.
__ Locate assigned Administration Building area shown on the layout drawing on Page 2 of 3 of this enclosure.
NOTE: I. The EOF Emergency Planner and EOF Data Coordinator can assist with computer connections.  
NOTE:
: 2. IE.a computer is needed, THEN a computer that is not being used for another ERO function (e.g., Regulatory Compliance section.
I. The EOF Emergency Planner and EOF Data Coordinator can assist with computer connections.
Performance Improvement Team. Human Resources group) may be used. 3. Printer paths for Catawba Nuclear Station Administration Building Printers are CNSADM2 for Copier Room (Room 143) and CNADM127 for Room 127. ___ ._Set up assigned location as follows:
: 2. IE.a computer is needed, THEN a computer that is not being used for another ERO function (e.g., Regulatory Compliance section. Performance Improvement Team. Human Resources group) may be used.
: 3. Printer paths for Catawba Nuclear Station Administration Building Printers are CNSADM2 for Copier Room (Room 143) and CNADM127 for Room 127.
___._Set up assigned location as follows:
e IE.a computer is needed, THEN request help from EOF Data Coordinator.
e IE.a computer is needed, THEN request help from EOF Data Coordinator.
o IE.necessary.
o IE.necessary. THEN obtain copies of position procedu1:e enclosure from procedure SR/O/B/2000/003. Activation of the EOF. located in Emergency Preparedness procedures cabinet.
THEN obtain copies of position procedu1:e enclosure from procedure SR/O/B/2000/003.
Activation of the EOF. located in Emergency Preparedness procedures cabinet.
o J.E..printing capability is needed. THEN.setup printers using DAE Printer Selector Program.
o J.E..printing capability is needed. THEN.setup printers using DAE Printer Selector Program.
o IE.copies of plant procedures are required, THEN perform one of the following:
o IE.copies of plant procedures are required, THEN perform one of the following:
o For Emergency Plan Implementing Procedures (RPs,, SHs, and SRs), make copy from Control Copy located in Emergency Preparedness Procedures cabinet.
o For Emergency Plan Implementing Procedures (RPs,, SHs, and SRs), make copy from Control Copy located in Emergency Preparedness Procedures cabinet.
o For all other procedures, print a copy from Fusion on DAE using Catawba Admin Building Mail Room printer CNSADM2.
o For all other procedures, print a copy from Fusion on DAE using Catawba Admin Building Mail Room printer CNSADM2.
o Assume or continue ERO role according to procedure Activation of the EOF. INITIALS PRINTED NAME ___________
o Assume or continue ERO role according to procedure SR/O/B/2000/003~ Activation of the EOF.
_
INITIALS PRINTED NAME ___________ _
I STATE AND COUNTY 153B WORK AREA STATE AND COUNTY 1S3A WORK AREA 137B ACCIDENT ASSESS LOBBY I 152. t.:l 0 I 137A DOSE ASSESS KITCHEN RMl61 l==:I BUSINESS t===i BUS 106 MGR ALTERNATE EOF IN THE CNS ADlVllN BLDG EMERGENCY MAIL KIT STORAGE RMl48 ROOM RM HR BVS 164 HR 1---HR HR RM 144 RJl.f 1431 EOF SVC NRC EQUIP BBA NOS RMl45 NOS NOS EP MGR RM 1300 EP RM 130C HU MGR RM 1308 OE ADM I '\ I DATA EMERG COO RD PLANNER I -I OFFS I TE COMM u---VP ASST SITE VP PLANT ENGR NOS BREAf COPY Pl RA RM MGR MGR u=i REG AFFAIRS NUC INT RMl:z.7 EOfDIA.EOtl>
 
A..\.M MGR SS MGR OE MGR NEWS RAM SfAThS MGR LUG RECOl!ll&#xa3;R MGR, 01<'},"SfTE COMM. PUBL PUBLIC Af.1''AtR'i SPOKES VP CONJ'. ROOM flUit. t 14) I rJJ "' ...... c "O 0 ..... !') = --* "'! ... (':> = !') :;,:: "'! Q >0 l;ll c c. !') '"I = &sect; !':> -* (':> = (':> N Ul --c. -tr.I (':> * "'! = :;,:: -I:> 0 s* '""Cl en PJ (IQ ("!) 0 N -.._ 0 > .....;.,
I STATE AND COUNTY 153B WORK AREA STATE AND COUNTY 1S3A WORK AREA 137B ACCIDENT ASSESS LOBBY I 152.
t::> w 0 0 0 --0 0 w Enclosure 6.25 Setup of McGuire or Oconee Alternate EOF in Catawba Admin Bldg. P;1b\lclnfo  
t.:l 0  
<*001dm * .i.101 \"P fO;"il-'l*:Rr:o.irt uoo:u EOE Functional Areas: f:nF Tc.:h l.i:liiCI\
~
L.o;: Rccmdi:r l.<-,itl Oft'sJlcAt,rn<.:)
I 137A DOSE ASSESS  
Amstinf f.OFP11ct101 rnP Dm:i:1m SR/0/ N2000!003 Page 3of3 VP Conf'crence Room**:_
~
Command & Control Center (EOF' Director, Accident Assessment Rad Assessment  
KITCHEN RMl61 l==:I BUSINESS t===i BUS 106 MGR ALTERNATE EOF IN THE CNS ADlVllN BLDG EMERGENCY MAIL KIT STORAGE RMl48 ROOM RM HR BVS 164 HR 1---
: Manager, Lead Offsite Agency Communicator, EOF Log Recorder, EOF Emergency Planner EOF Tech Liaison, Public Information Coordinator, Slate EM Representatives)
HR HR RM 144 RJl.f 1431 EOF SVC NRC EQUIP BBA NOS RMl45 NOS NOS EP MGR RM 1300 EP RM 130C HU MGR RM 1308 OE ADM I  
EP Manager's Office--Offsite Comnmnicalors EP Cubes -Data Coordinator Touchdown Room 142 -EOF Services PA Manager Office -News Manager, Public Spokesperson Room 153 A/B -State and County Work Area NRC Resident Inspector Offices -NRC Site Team -Room 13 7 A -Dose Assessment Room 1378 -Accident Assessment Catawba TSC (Not Shown) -Offsite Monitoring Enclosure 6.26 NRC Response Team Briefing sRJO/ N20001003 Page 1 of 2 A) Emergency Classification Time Declared:
'\\
am/pm (Ctment Class) Unusual Event .6. Ale1t SiteAreaEmergency  
I DATA EMERG COO RD PLANNER I
.6. General Emergency EAL Descriptor Text: Provide a brief summary of the event and mitigating actions in progress:-----------
I OFFS I TE COMM u---
*-''"'"'""
*~
__ ,,,,,,,,.
~
............
~
__ .. ....................  
VP ASST SITE VP PLANT ENGR NOS BREAf COPY Pl RA RM MGR MGR u=i REG AFFAIRS NUC INT RMl:z.7 EOfDIA.EOtl> A..\\.M MGR SS MGR OE MGR NEWS RAM SfAThS MGR LUG RECOl!ll&#xa3;R
,.,.,, .. . . -------*********-*---------*-**-********----**
: MGR, 01<'},"SfTE COMM.
B) Fission Product' Barrier Status Fuel RCS CTMT Intact: Potential Loss: .6. .6. Lost: .6. .6. .6. C) Plant Conditions Mode I -Power Operations  
PUBL PUBLIC Af.1''AtR'i SPOKES VP CONJ'. ROOM flUit. t 14) rJJ c  
% Mode 2 -Startup Mode 3 -Hot Standby Mode 4 -Hot ShutdO\vn Mode 5 -Cold Shutdown Mode 6 -Refueling Time of shutdown:
"O 0.....  
____ am/pm Stable .6. Improving Unstable  
~
!')
("'.)~
~ =  
~ "'!  
~
(':>  
~= =  
!')
Q  
>0 l;ll c
: c. !')  
'"I  
= &sect;  
-* (':>  
~
= (':>
N  
~> Ul
: c. -
tr.I
(':>  
"'! =
I:>  
~
0  
~
s*  
'""Cl en PJ ~
(IQ
("!) 0 N -.._
0 >  
.....;., t::>
w 0
0 0 --
0 0 w  
.25 Setup of McGuire or Oconee Alternate EOF in Catawba Admin Bldg.
P;1b\\lclnfo  
<*001dm *.i.101  
\\"P fO;"il-'l*:Rr:o.irt uoo:u EOE Functional Areas:
f:nF Tc.:h l.i:liiCI\\
L.o;:
Rccmdi:r l.<-,itl Oft'sJlcAt,rn<.:)
Commt;UJ&#xa2;t~or Amstinf f.OFP11ct101 rnP Dm:i:1m SR/0/ N2000!003 Page 3of3 VP Conf'crence Room**:_ Command & Control Center (EOF' Director, Accident Assessment M~irnger, Rad Assessment Manager, Lead Offsite Agency Communicator, EOF Log Recorder, EOF Emergency Planner EOF Tech Liaison, Public Information Coordinator, Slate EM Representatives)
EP Manager's Office-- Offsite Comnmnicalors EP Cubes - Data Coordinator Touchdown Room 142 - EOF Services PA Manager Office - News Manager, Public Spokesperson Room 153 A/B - State and County Work Area NRC Resident Inspector Offices - NRC Site Team Room 13 7 A - Dose Assessment Room 1378 -Accident Assessment Catawba TSC (Not Shown) - Offsite Monitoring  
.26 NRC Response Team Briefing sRJO/ N20001003 Page 1 of 2 A) Emergency Classification Time Declared:
am/pm (Ctment Class)
Unusual Event  
.6. Ale1t SiteAreaEmergency.6. General Emergency EAL Descriptor Text:
Provide a brief summary of the event and mitigating actions in progress:-----------
............ -~_,,,,,,, __
~.. ~....................,.,.,,.. ~,--
B) Fission Product' Barrier Status Fuel RCS CTMT Intact:  
~
~
~
Potential Loss:  
.6.  
~
.6.
Lost:  
.6.  
.6.  
.6.
C) Plant Conditions Mode I - Power Operations Mode 2 - Startup Mode 3 - Hot Standby Mode 4 - Hot ShutdO\\vn Mode 5 - Cold Shutdown Mode 6 - Refueling Time of shutdown: ____ am/pm Stable  
.6. Improving Unstable  
.6. Deteriorating Briefly describe equipment, instrument or other problems:---------------
.6. Deteriorating Briefly describe equipment, instrument or other problems:---------------
--**--*-----*----------------'--'-
----**-------
------------
D) Radiological Release None or Imminent In Progress Terminated  
D) Radiological Release None or Imminent In Progress Terminated  
.6. Controlled  
.6. Controlled  
.6. Uncontrolled Start Time:_ am/pm Estimated Duration:
.6. Uncontrolled Start Time:_ am/pm Estimated Duration: _______ _
_______ _ E) Onsite Protective Actions None or Site Assembly I Accountability Local Area Evacuation Protected Area Evacuated Site Evacuated Offsite Assembly Emergency Exposures Authorized Potassium Iodide Issued F) Response  
E) Onsite Protective Actions None or Site Assembly I Accountability Local Area Evacuation Protected Area Evacuated Site Evacuated Offsite Assembly Emergency Exposures Authorized Potassium Iodide Issued F) Response :Facilities Activated None or Technical Support Center Operations Support Center Emergency Operations Faci lily Joint Information Center G) Offsitc Assistance Requested None or Medical Fire Department Law Enforcement H) Offsite Notifications
:Facilities Activated None or Technical Support Center Operations Support Center Emergency Operations Faci lily Joint Information Center G) Offsitc Assistance Requested None or Medical Fire Department Law Enforcement H) Offsite Notifications
__ am/pm
__ am/pm __ am/pm __ am/pm County INPO State .6. ANI News Release I) Protective Action Recommendations None or Evacuate:
__ am/pm
__ am/pm County  
~ INPO State  
.6. ANI News Release I) Protective Action Recommendations None or Evacuate: ----------
Shelter:-----------
Shelter:-----------
J) Off site Actions/Response None iss11ed, or: Schools .6. Recreation Areas Other:-----------
J) Off site Actions/Response None iss11ed, or:
Schools  
.6. Recreation Areas Other:-----------
Evacuate:
Evacuate:
Shelter:
Shelter:
OR--.6. Completed Enclosure 6.26 NRC Response Team Briefing K) Additional Notes SR/01 A/2000/003 Page 2 of2 ------,,.--**-***--**---*--
Unde-rw_a_y--~ OR--.6. Completed  
........
.26 NRC Response Team Briefing K) Additional Notes SR/01 A/2000/003 Page 2 of2  
__ ... *"---------
--~---,
----* NOTE: This briefing is intended to provide general information related to the event. More detailed information will be available from individual licensee counterparts.
NOTE:
Additional Discussion Items: I. Personnel safety (as applicable)  
This briefing is intended to provide general information related to the event. More detailed information will be available from individual licensee counterparts.
: a. Personnel accountability requirements  
Additional Discussion Items:
: b. Radiation protection requirements  
I. Personnel safety (as applicable)
: c. Industrial safely requirements  
: a.
: d. Protective equipment requirements  
Personnel accountability requirements
: e. Reporting emergency situation (e.g .. fire/medical)  
: b.
: 2. Emergency evacuation  
Radiation protection requirements
: a. Location of exits b. Location of emergency assembly areas 3. Personal comfort a. Location of restrooms  
: c.
: b. Location of water, beverages.
Industrial safely requirements
and food c. Location of quiet area 4. Facility specific information  
: d.
: a. Prohibited activities (e.g., use of cell cameras.
Protective equipment requirements
cordless phones, etc.) b. Facility telephones (how to call outside the facility, reserve phones, etc.) c. Telephone numbers (e.g., response facility phone directory/phone listing)  
: e.
: d. Reference locations and access e. Making photo copies f. Sending/receiving facsimiles  
Reporting emergency situation (e.g.. fire/medical)
: g. Logistical assistance/support
: 2. Emergency evacuation
{l} {2} {3} {4} {5} {6} {7} {8} {9) (I 0} { 11} : 12} { 13} { 14} {15} {16} {17} {18} {19} {20} {21} {22} I')"' l-.:> J {24} {26} Enclosure 6.27 Commitments for SR/O/ A/2000/03 SRJO/ A/2000/003 Page I of 4 PIP O-M97-4210 NRC-1, NRC Commitments per H.B. Barron's 11/6/97 response to exercise weakness.
: a.
Location of exits
: b.
Location of emergency assembly areas
: 3. Personal comfort
: a.
Location of restrooms
: b.
Location of water, beverages. and food
: c.
Location of quiet area
: 4. Facility specific information
: a.
Prohibited activities (e.g., use of cell phones~ cameras. cordless phones, etc.)
: b.
Facility telephones (how to call outside the facility, reserve phones, etc.)
: c.
Telephone numbers (e.g., response facility phone directory/phone listing)
: d.
Reference locations and access
: e.
Making photo copies
: f.
Sending/receiving facsimiles
: g.
Logistical assistance/support  
 
{l}
{2}
{3}
{4}
{5}
{6}
{7}
{8}
{9)
(I 0}
{ 11}
: 12}
{ 13}
{ 14}
{15}
{16}
{17}
{18}
{19}
{20}
{21}
{22}
I')"'
l-.:> J
{24}
{26}.27 Commitments for SR/O/ A/2000/03 SRJO/ A/2000/003 Page I of 4 PIP O-M97-4210 NRC-1, NRC Commitments per H.B. Barron's 11/6/97 response to exercise weakness.
Deleted PIP 2-C96-0273, Unit l LOOP 2/6/1996 flO CFR 50.54(x)/(y)]
Deleted PIP 2-C96-0273, Unit l LOOP 2/6/1996 flO CFR 50.54(x)/(y)]
Deleted Deleted Deleted Deleted Deleted Deleted Deleted Deleted Deleted Deleted Deleted Deleted Deleted NIA Deleted Deleted Deleted Deleted Deleted PIP G-03-606, Final Rule. "Consideration of Potassium Iodide in Emergency Plans" (66 FR 5427) Deleted Deleted Deleted
Deleted Deleted Deleted Deleted Deleted Deleted Deleted Deleted Deleted Deleted Deleted Deleted Deleted NIA Deleted Deleted Deleted Deleted Deleted PIP G-03-606, Final Rule. "Consideration of Potassium Iodide in Emergency Plans" (66 FR 5427)
{27} Deleted { 28} Deleted {29} Deleted {30} Deleted { 31 } Deleted { 32} Deleted ( 33} Deleted {34} Deleted Enclosure 6.27 Commitments for SR/O/ A/2000/03 SR/0/ A/2000/003 Page 2of4 : 35 J PIP-M-05-3631, Failure to update the Emergency Plan in accordance with evaluation of NRC RIS 2004-13, "Consideration of Sheltering in Licensee's Range of Protective Action Recommendations" and 2004-13 Supplement 1 . ( 36 J PIP-C-05-4854, Failure to update the Emergency Plan in accordance with evaluation of NRC RIS 2004-13, "Consideration of Sheltering in Licensee's Range of Protective Action Recommendations" and 2004-13 Supplement I. {37} Deleted {38) Deleted {39} Deleted {40} Deleted { 41} Deleted {42} Deleted {43} Deleted {44} Deleted {45} Deleted {46} Deleted {47} Deleted {48} Deleted {49} Deleted {50) Deleted { 51} PIP M-09-4514, C.A. 19 _J
Deleted Deleted Deleted  
{ 52} Deleted {53} Deleted [ 54} Deleted { 5 5} Deleted { 56} Deleted { 57} Deleted { 5 8} Deleted {59} Deleted l 60} Deleted Enclosure 6.27 Commitments for SR/O/ A/2000/03 SRJO/ A/2000/003 Page 3 of 4 [61] PIP 0-11-1177, DocuTracks NG0-20 I 2-000 I 22, Catawba, McGuire.
 
and Oconee Emergency Plan Minimum Staffing License Amendment  
{27}
: Request, approved 7/29/1 I I 62 l Deleted : 63 l Deleted { 64} Deleted { 65) Deleted { 66} Deleted { 67} Deleted { 68} Deleted {69} Deleted { 70} Deleted { 71 } Deleted { 72} Deleted { 73} Deleted {74} Deleted {75} PIP G-13-1461, C.A. 19, IER Ll-13-10.  
Deleted
"Nuclear Accident at the Fukushima Daiichi Nuclear Power Station"  
{ 28}
{76} PIP M-12-2339.
Deleted
C.A. 34. NRC Near Term Task Force (NTTF) Recommendation 9.3 EP Staffing  
{29}
-Fukushima Dai-lchi Accident Enclosure 6.27 Commitments for SR/O/A/2000/03 SR/0/ A/2000/003 Page 4 of4 {77} IER Ll-13-10, "Nuclear Accident at the Fukushima Daiichi Nuclear Power Station"  
Deleted
{78} IER Ll-11-14, "Near-Term Actions to Address the Effects of an Extended Loss of All AC Power in Response to the Fukushima Daiichi Event" { 79} Deleted { 80} Deleted { 81} Deleted { 82} Deleted}}
{30}
Deleted
{ 31 }
Deleted
{ 32}
Deleted
( 33}
Deleted
{34}
Deleted.27 Commitments for SR/O/ A/2000/03 SR/0/ A/2000/003 Page 2of4
: 35 J PIP-M-05-3631, Failure to update the Emergency Plan in accordance with evaluation of NRC RIS 2004-13, "Consideration of Sheltering in Licensee's Range of Protective Action Recommendations" and 2004-13 Supplement 1.
( 36 J PIP-C-05-4854, Failure to update the Emergency Plan in accordance with evaluation of NRC RIS 2004-13, "Consideration of Sheltering in Licensee's Range of Protective Action Recommendations" and 2004-13 Supplement I.
{37}
Deleted
{38)
Deleted
{39}
Deleted
{40}
Deleted
{ 41}
Deleted
{42}
Deleted
{43}
Deleted
{44}
Deleted
{45}
Deleted
{46}
Deleted
{47}
Deleted
{48}
Deleted
{49}
Deleted
{50)
Deleted
{ 51}
PIP M-09-4514, C.A. 19
_J
 
{ 52}
Deleted
{53}
Deleted
[ 54}
Deleted
{ 5 5}
Deleted
{ 56}
Deleted
{ 57}
Deleted
{ 5 8}
Deleted
{59}
Deleted l 60}
Deleted.27 Commitments for SR/O/ A/2000/03 SRJO/ A/2000/003 Page 3 of 4
[61]
PIP 0-11-1177, DocuTracks NG0-20 I 2-000 I 22, Catawba, McGuire. and Oconee Emergency Plan Minimum Staffing License Amendment Request, approved 7/29/1 I I 62 l Deleted
: 63 l Deleted
{ 64}
Deleted
{ 65)
Deleted
{ 66}
Deleted
{ 67}
Deleted
{ 68}
Deleted
{69}
Deleted
{ 70}
Deleted
{ 71 }
Deleted
{ 72}
Deleted
{ 73}
Deleted
{74}
Deleted
{75}
PIP G-13-1461, C.A. 19, IER Ll-13-10. "Nuclear Accident at the Fukushima Daiichi Nuclear Power Station"
{76}
PIP M-12-2339. C.A. 34. NRC Near Term Task Force (NTTF) Recommendation 9.3 EP Staffing - Fukushima Dai-lchi Accident  
.27 Commitments for SR/O/A/2000/03 SR/0/ A/2000/003 Page 4 of4
{77}
IER Ll-13-10, "Nuclear Accident at the Fukushima Daiichi Nuclear Power Station"
{78}
IER Ll-11-14, "Near-Term Actions to Address the Effects of an Extended Loss of All AC Power in Response to the Fukushima Daiichi Event"
{ 79}
Deleted
{ 80}
Deleted
{ 81}
Deleted
{ 82}
Deleted}}

Latest revision as of 08:46, 9 January 2025

EPIP Manual, Revision 16
ML17124A528
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 04/15/2017
From:
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML17124A528 (118)


Text

Distribution:

Duke Energy Date: 4l15l2Q17 Document Transmittal #: TR-NUC-MC-005809

1. MCG OPS SfAFF MGR DOCUMENTTRANSMITTALFORM

Purpose:

~

2.

MCG PLANT ENG. LJBR.

3.

MCG RAD PROT Released By:

4.

NUCLEAR FAOLITY PLANNER, NC Facility: MCGUIRE NUCLEAR STATION D!.!k!il Energv

5. OPS TRNG MGR.

SUBJECT 13225 !::li!9!:~ E!i!CCV ROi!d

6. RESIDENT NRC INSPECT Issue MNS EPIP Manual Document Management
7.

US NRC DOC CNTL WASHNGTON DC./

MG02DM Huntersville, NC 28078 Page 1of1 MNSDCRM@duke-energx.com

  • .***.*.** Doci.urient ID.*........,c ' <* **... **.* ;,

{:

'.* 1 2

3 4

5 6

7 APMN*" JV1c:.t;jt~EPiP~Mariua,12oiG=!ssui:o.*. .*, ;::::, R&AIE FYIIE R&AIE R&AIE R&AIE PRINTILP R&AIE Remarks: R!;lmoveLRe~li!ce; Index, SRLOLAL2QQOLQ03

PROCEDURE#

RP/O/ A/5700/000 RP/O/A/5700/001 RP/O/ A/5700/002 RP/O/ A/5700/003 RP/O/ A/5700/004 RP/O/ A/5700/006 RP/O/ A/5700/007 RP/O/ A/5700/008 RP/O/ A/5700/009 RP/O/A/5700/010 RP/O/A/5700/011 RP/O/A/5700/012 RP/O/ A/57001018 RP/O/A/5700/019 RP/O/ A/5700/020 RP/O/ A/5700/022 RP/O/ A/5700/024 RP/O/ A/5700/026 RP/O/B/5700/023 RP/O/B/5700/029 HP/O/B/1009/002 HP/O/B/10091003 HP/O/B/1009/006 HP/O/B/1009/010 HP/O/B/1009/021 HP/O/B/1009/022 EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX Classification of Emergency Notification of Unusual Event Alert Site Area Emergency General Emergency Natural Disasters Earthquake Release of Toxic or Flammable Gases Collisions/Explosions NRC Immediate Notification Requirements Conducting a Site Assembly, Site Evacuation or Containment Evacuation Activation of the Technical Support Center (TSC)

Notification to the State and Counties from the TSC Core Damage Assessment Activation of the Operations Support Center (OSC)

Spill Response Procedure Recovery and Reentry Procedure Operations/Engineering Required Actions in the Technical Support Center (TSC)

Nuclear Communications (NC) Emergency Response Plan Notifications to Offsite Agencies From The Control Room Alternative Method for Determining Dose Rate Within the Reactor Building Recovery Plan Procedure for Quantifying High Level Radioactivity Releases During Accident Conditions Releases of Radioactive Effluents Exceeding Selected Licensee Commitments Estimating Food Chain Doses Under Post-Accident Conditions Accident and Emergency Response REVISION NUMBER Rev.027 Rev.034 Rev.035 Rev.035 Rev. 033 Rev.032 Rev.027 Rev.007 Rev. 004 Rev. 031 Rev.020 Rev.048 Rev.030 Rev.007 Rev. 032 Rev.016 Rev.002 Rev.017 Rev.005 Rev. 021 Rev. 002 Rev. 004 Rev. 006 Rev. 007 Rev.001 Rev. 005 March 22, 2017 Rev. 170

PROCEDURE#

HPIO/Bll 0091023 HPIO/Bll 0091024 HPIO/Bll 0091029 SHIOIBl20051001 SHIOIBl20051002 SHIOIBl20051003 SR/01A/20001001 SR/OIBl20001001 SRIOIBl20001002 SR/01 A/20001003 SRIOIBl20001003 SR/01 A/20001004 SR/OIBl20001004 EP Group Manual PT IOI A/46001088 APIOI A/5500104 7 AD-EP-ALL-0202 AD-EP-ALL-0203 AD-EP-ALL-0204 EMERGENCY PLAN Th1PLEMENTING PROCEDURES INDEX TITLE REVISION NUMBER Environmental Monitoring for Emergency Conditions Rev.008 Personnel Monitoring for Emergency Conditions Rev.004 Superseded by AD-EP-ALL-0202 Superseded by AD-EP-ALL-0202 Superseded by AD-EP-ALL-0203 Superseded by AD-EP-ALL-0204 Standard Procedure for Corporate Communications Rev.2 Response to the Emergency Operations Facility Superseded by SR/01A/20001001 Rev. 13 Deleted Activation of the Emergency Operations Facility Rev. 012 Superseded Notification to States and Counties from the Emergency Rev. 007 Operations Facility Superseded Section 1.1 Emergency Organization Rev.26 Functional Check of Emergency Vehicle and Equipment Rev. 009 Security Events Rev.016 Emergency Response Offsite Dose Assessment Rev.003 Protocol for the Field Monitoring Coordinator during Emergency Conditions Distribution of Potassium Iodine Tablets in the Event of a Radioiodine Release 2

Rev. O Rev. 0 March 22, 2017 Rev. 170

Duke Energy Company Procedure No.

NUCLEAR FLEET SR/O/ A/2000/003 Activation of the Emergency Operations Facility Revision No.

012 Ref etence IJ se PERFORMANCE I

This Procedure was printed on 3/l 6/20179:15 AM from the electronic library as:

(ISSUED) - PDF Format Compare with Control Copy eve!)' 14 calendar days while work is being pcrfhrmed.

Compared with Control Copy *

---Date *-*.

Compared with Control Copy

  • Date Compared with Control Copy
  • Dale
  • PriJlfed Name and Signature Date( s) Performed J Work Order/Task Number (WO#)

COMPLETION I

D Yes D NA Checklists and or blanks initialed, signed, dated, or filled in NA. as appropriate?

D Yes D NA Required attachments included?

D Yes D NA Charts, graphs, data sheets. etc. allachcd, dated, identified, and marked?

D Yes D NA Calibrated Test Equipment, if used, checked out/in and referenced to this procedure?

D Yes D NA Procedure requirements met?

Verified By Date

  • Printed Name a11d SiE;nature Procedure Completion Approved Date
  • Pri11ted Name and Signature Remarks (a/fach additional pages, if necesswy)

IMPORTANT: Do NOT mark on barcodes.

Printed Date:

  • 3/16/t 7*

Atlachment Number.* *FULL*

I llllll llll I II 1111111111111111111111111111111 111111111111111111111111111111 Revision No,;

~012*

1111111111111111111111111 Procedure No.:

  • sR/O/N2000/003' 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111

Duke Energy Procedure No.

Standard Procedure for CNS, 1v1NS & ONS SR/0/ A/2000/003 Revision No.

Activation of the Emergency Operations Jf.acility 012 Ref ere nee Use Electronic Reference No.

SHR0005P

SRJO/ A/2000/003 Page 2of8 Activation of the Emergency Operations Facility I. PURPOSE 1.1 This procedure describes the emergency responsibilities and duties of the Emergency Operations Facility Emergency Response Organization (ERO) members.

2. DEFINITIONS

'*****"**.. *************************************""***************************************----~-*~***~-~------*-~**.. n**-----*--*---****-**--*****y****** *** _,,,,,... --*****y**-~*********

NOTE:

2.1 2.2 NOTE:

I..,

The EOF must be operational using 75 minutes as a goal for the minimum staff to be in place following declaration of an Alert or higher classification. Turnover should occur with the TSC at a time that will not decrease the effectiveness of communications with the offsite agencies.

Operational: The Emergency Response Facility (e.g., Technical Support Center, Operations Support Center, Emergency Operations Facility) is staffed, ready to receive turnover and ready to perform assigned emergency response functions.

Activated: The Emergency Response Facility (e.g.. Technical Support Center. Operations Support Center. Emergency Operations Facility) has accepted turnover and has direction and control of assigned emergency. response functions.

The following definition is applicable to the Emergency Notification Form Line5.

Emergency Release: An unplanned, quantifiable radiological release to the environment caused by a declared emergency. (AD-EP-ALL-0002}

3. PROCEDURE NOTES:

o This procedure and the position specific enclosures are not intended to be followed in a serial step-by-step sequence.

o Instructions and guidance steps are to be implemented as applicable for the specific needs of the event.

Use hard copy (paper) forms or electronic equivalents to complete all fonns.

            • 1 References to "Status Boards" may refer to physical displays mounted in the facility or electronic displays either projected~ displayed on large monitors or on personal computer monitors.

3.1 General instructions for all ERO members.

3. I. I Ensure appropriate checklist, logs and forms are completed.

SR/0/ A/2000/003 Page 3of8 3.1.2 Provide critical information to appropriate personnel upon receipt rather than waiting for a time out or roundtable discussion.

3.1.3 Use 11Attentio11 in the EOF" to announce critical information in the facility.

    • -**-------------------------------~

NOTE {IER Ll-13-10}:

o The Emergency Response Organization strncture is scalable and flexible, based on the size, complexity, and the specifics of the hazard environment created by the emergency event Additional functional elements (e.g., ERO positions) can be established to enhance the management and coordination of the event.

o When the emergency event's complexity increases, then the ERO can expand, as additional functional responsibilities are needed.

o When the complexity decreases. then the ERO can contract, when those additional functional responsibilities are no longer needed.

o The makeup and structure of the EOF will be determined by the EOF Director.

o EOF staffing may be required fr>r extended periods of time (e.g., greater than 10 days !'or BDBEEs. ELAP, etc.).

3.1.4

!.E.additional personnel are needed to support the emergency or for 24-hour coverage, THEN refer to the following for telephone numbers:

ERO Member Contact lnfon1rntion notebook on the EOF Director's Area bookshelf (home, office and cell phone numbers).

Duke Energy Enterprise Phone Book (ot1ice and cell phone numbers).

Emergency Response Organization (ERO) database by contacting the EOF Emergency Planner.

3.1.5

!.E.equipment problems occur, THEN contact the following:

Computer-EOF Data Coordinator o

Communications systems and other facility equipment-EOF Services Manager

SRJO/ A/2000/003 Page 4of8 NOTE: When using the OAC to trend plant data for decision purposes, please note that reducing the trend screen overall size can cause the plotted data to be suspect upon restoration to full size. It is recommended that trend plots be mini1i1ized using the standard windows button (the button in the top right that has the underbar). The software code is designed to refresh the trend screens upon restoration to full size from a minimized state. A second method is to have the OAC redraw the trend after restoring the trend screen to full size.

3.2 IE.access to SDS data is desired, THEN login to system as follows:

3.2.1 From DAE main screen, select Search DAE tab.

3.2.2 Type SDS in Search box ~\\nd press Enter.

3.2.3 Select Catawba OAC SDS, McGuire OAC SDS. or Oconee OAC SDS as applicable.

3.2.4 Select Run Application.

3.2.5 Logon with LAN ID and Password as follows:

NAM\\UserlD Password 3.2.6 Select the desired OAC to access by checking the box and then clicking the Start bullon. You can start multiple sessions if desired.

CNS 0

Cl RT PRI C2 RT PRI 0

Cl RTBAC

  • C2RTBAC
o.

ProDAC

  • Simulator
  • Spare Sim Q

EPSim 0

EDS MNS

  • Ml RTSPRI 0

Ml RTS BAC

  • ProDaC
  • Simulator
  • Sim Backup to EDS

ONS OlOAC

  • 020AC
  • 030AC KHUOAC Simulato1* A
  • Simulator B Simulator ICS Sim Develop ProUaC 3.2. 7 Access emergency response displays as follows:

Catawba/McGuire SRJ01 A/2000/003 Page 5of8 Enter GD (space)"Group Display Name" in the white box at the upper right portion ofthc screen.

Catawba Specific Group Display Name EMF ERDSl ERDS2 EROCONT EROCOREI EROCORE2 EROCORE3 EROfNJCT ERO PLEAK EROS LEAK EROPRJM ERORXG EROSAMG EROSECND MET Group Display Description Selected EMF data and locations EROS Group I ERDS Group 2 Selected values associated with containment.

lncore temperature values Additional incore temperature values Additional incore temperature values Selected letdown/charging values Selected primary to contaimnent leakage values Selected primary to secondary leakage values Selected primary system values Selected Value for Reactor Engineer Selected SAMO Values Selected secondary system values Met Tower Points McGuire Specific Group Displav Name EMF ER0-1 EROCONT EROCORE EROINJCT ERO PRIM EROSECND WEATHER Group Display Description Selected EMF data and locations Selected plant parameters Emergency Response Containment Emergency Response Incore Emergency Response Injection Emergency Response Primary Emergency Response Secondary.

Weather Data

Oconee SR/0/ A/2000/003 Page 6of8 Enter applicable Turn On code in the white box at the upper right portion of the screen.

Oconee Specific Turn On Code Name ERO MENU EROPRI EROS EC ERO CONT ERO AUX ERO AREA EROPROC EROENV EROECCS ERDSMENU RBOI Turn On Code Description Menu Access for Oconee Data Screens Selected Primary System values Selected Secondary System values Selected Containment Condition values Selected Radiation Monitor values Selected Area Radiation Monitor values Selected Process Radiation Monitor values Selected values for Dose Assessment and Field Monitoring use Selected ECCS values Menu Access for Oconee EROS Data Selected Dose Assessment Data 3.3 The Emergency Plant Status application bas also been established for Oconee emergency response use. This application is available from DAE.

3.3.1 To launch the Emergency Plant Status application. from DAE select Seard1 DAE and type in Emergency Plant Status.

3.3.2 Select the Emergency Plant Status - ONS 3.3.3 Select Run Application 3.3.4 Enter your password and verify domain as NAM.

3.4 IF EOF facility in Energy Center is unavailable, THEN establish Alternate EOF at designated alternate location {IER Lt-13-10}:

o Catawba Nuclear Station event - McGuire Administration Building per Enclosure 6.24 o

McGuire Nuclear Station event - Catawba Administration Building per Enclosure 6.25 ci.

Oconee Nuclear Station event - Catawba Administration Building per Enclosure 6.25

srvO; A/20001003 Page 7of8 3.5 Perform the applicable actions for the event using instructions and guidance in the following enclosures:

ERO Position Title Enclosure EOF Director/Assistant EOF Director 6.1 EOF Director/Assistant EOF Director Checklist Radiological Assessment Manager 6.6 Radiological Assessment Manager Checklist EOF Dose Assessor 6.7 EOF Dose Assessor Checklist Field Monitoring Coordinator 6.8 Field Monitoring Coordinator Checklist i---

Radio Operator 6.9 Radio Operator Checklist EOF OITsite Agency Communicator

6. 10 EOF Offsite Agency Communicator Checklist EOF Services
6. 11 EOF Services Administration/Commissary Adm in i strati on/ C01 n rn i ssary Checklist

-*-*.. ~--*-

Accident Assessment Manager 6.12 Accident Assessment Manager Checklist Accident Assessment Interface

6. 13 Accident Assessment Interface Checklist Operations Interface Checklist 6.14 Operations Interface Checklist EOF Emergency Planner 6.15 EOF Emergency Planner Checklist EOF Log Recorder 6.16 EOF Log Recorder Checklist EOF Data Coordinator 6.17 EOF Data Coordinator Checklist EOF Services Manager 6.18 EOF Services Manager Checklist
4. REFERENCES 4.1 Catawba Nuclear Station (CNS) Emergency Plan 4.2 McGuire Nuclear Station (MNS) Emergency Plan 4.3 Oconee Nuclear Station (ONS) Emergency Plan

I 5. RECORDS s1v01 A/20001003 Page 8 of 8

5. I All Jogs, forms and records completed as the result of implementing this procedure during an actual declared event shall be retained as pennanent plant records. Nuclear Generation Record Retention Rule Number 421734, "Procedures-Technical Completed."

5.2 All checklists, logs and forms completed as the result of implementing this procedure shall be collected at the end of the event and provided to the site Emergency Preparedness Manager.

6. Enclosures 6.1 EOF Director/Assistant EOF Director Checklist 6.2 Catawba Offsite Protective Actions 6.3 McGuire Offsite Protective Actions 6.4 Oconee Offsite Protective Actions 6.5 Emergency Classification Downgrade/Termination 6.6 Radiological Assessment Manager Checklist 6.7 EOF Dose Assessor Checklist 6.8 Field Monitoring Coordinator Checklist 6.9 Radio Operator Checklist 6.10 EOF Offsitc Agency Communicator Checklist 6.11 EOF Services Administration/Commissary Checklist 6.12 Accident Assessment Manager Checklist 6.13 Accident Assessment Interface Cht::cklist 6.14 Operations Interface Checklist 6.15 EOF Emergency Planner Checklist 6.16 EOF Log Recorder Checklist 6.17 EOF Data Coordinator Checklist 6.18 EOF Services Manager Checklist 6.19 Establishing Communications Links Between McGuire SAMO Evaluators 6.20 Oconee Recovery Guidelines 6.21 Keowee Hydro Dam/Dikes - Imminent Failure/Potential Failure Descriptions 6.22 EOF Evacuation Checklist 6.23 EOF Briefing Guideline 6.24 Setup of Catawba Alternate EOF in McGuire Admin Bldg.

6.25 Setup of McGuire or Oconee Alternate EOF in Catawba Adm in Bldg.

6.26 NRC Response Team Briefing 6.27 Commitments for SR/O/B/2000/003

INITIAL.1 EOF Director/Assistant EOF Director Checklist*

SR/0/ A/2000/003 Page 1 of 15 NOTE:

Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.

__ IE reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.

__ Don position badge.

__ Log in to PC.

__ Log in to WebEOC.

__ Sign in on Sign In board.

NOTE:

The EOF Log Recorder will maintain the official log for the EOF Direct.or/Assistant EOF Director. The EOF Director/Assistant EOF Director may maintain an additional log if desired.

__ Establish Position Log of' activities sufficient to conduct turno\\;cr for on-coming shift.

__ Establish communications with Emergency Coordinator or Assistant Emergency Coordinator in affected site's TSC:

Q Use affected site's EOF Director to Emergency Coordinator Ringdown phone (Catawba and McGuire only)

OR o

Catawba TSC, 9-1-803-701-5870 QB e

McGuire TSC. 9-1-704-875-1951 OR o

Oconee TSC. 9-1-864-873-3921

<> IE communications cannot be established using normal phones, THEN refer to procedure AD-EP-ALL-0406, Duke Emergency Management Network (DEMNET). for instructions on using DEMNET.

NOTE:

EOF access is controlled through the use of a monitored card reader process.

__ Verify Energy Center Building Security personnel are monitoring the EOF entrance card reader.

NOTE:

The following step is needed for EOF data display. The Accident Assessment Manager updates the Fission Product Barrier status board.

__ Establish Fission Product Barrier status board display as follows.

D Log in to Assistant EOF Director computer.

D Log in to WebEOC.

.1 EOF Director/Assistant EOF Director Checklist D Click on Fission Product Barrier Status - SITE.

D Drag to right monitor AND maximize.

SR/0/ N2000/003 Page 2of15 INITIALS ___

PRINTED NAME ___________ (EOF Director)

INITIALS ___ _

PRINTED NAME ___________ (Asst. EOF Director)

NOTE:

I..1 EOF Director/Assistant EOF Director

,Checklist SRJO/ A/2000/003 Page 3of15 IF the emergency situation prevents activating the TSC within 75 minutes.of declaration, THEN the Control Room will:

c Turn over responsibility for state and county notification and Protective Action Recommendations to EOF.

1:1 Maintain responsibility for NRC Event Notification until released by NRC Communicator in TSC.

Maintain responsibility for classifications and continuous phone communications to the NRC until relieved by the Emergency Coordinator (EC) and NRC Communicator in the TSC.

2.

IF TSC remains unavailable and EOF cannot take responsibility for state and county notification and Protective Action Recommendations, THl~N the Control Room will maintain these responsibilities.

__ IF emergency situation prevents activating TSC within 75 minutes of declaration, THEN contact affected Site's Control Room:

Person Notified/Date/Time D Catawba Control Room. 9-803-701-5164 ________ _ *-------..:/ __ _

O McGuire Control Room. 9-980-875-4138 _____________./ ___ _

O Oconee Unit 1and2 Control Room. 9-1-864-873-2159

/ ___ _

0 Oconee Unit 3 Control Room, 9-1-864-873-2160 I -----

__ Verify EOF minimum staffing positions are prepared to assume their EOF duties prior to declaring the EOF operational:

EOF Director Accident Assessment Manager Radiological Assessment Manager Off-Site Agency Communicator Off-Site Agency Communicator.

OR lE Less than the above listed minimum EOF positions are filled,

~

The 75-minute EOF operational time requirement is near, ANU An extra person(s) is available whom the EOF Director believes is capable of filling a missing position(s) based on the training, experience and skills required by the ERO training program -

ETQS 7111.0, Emergency Response Training

~

An appropriate log entry is m.ade.

Request Assistant EOF Director monitor EOF multi-function machine for faxes sent to 704-382-1825.

NOTE:.1 EOF Director/Assistant EOF Director Checklist SR/0/ A/2000/003 Page 4of15 For all drills. messages should be preceded with "This is a drill. This is a drill."

__ Announce over EOF public address system:

"Anyone who is reporting to this facility outside of your normal work hours must complete a Fitness for the Duty Form. If you have consumed alcohol within the past five (5) hours or believe your work quality may be compromised due to fatigue, sickness, or other potentially impairing conditions, notify either the EOF Director, Assistant EOF Director, or the appropriate lead in your functional area.

11

__ Declare EOF operational. EOF operational time: __ **---------

NOTE:

For all drills. messages should be preceded with "This is a drill. This is a drill.

11

__ Announce over EOF public address system:

"Attention all EOF personnel. This is _________ ancl as or ___. __ hours, (EOF IJ1rcctor's Nam~)

the EOF is operational. Each EOF functional area should perform a Take a Minute in its work area."

__ Notify Emergency Coordinator or Assistant Emergency Coordinator that the EOF is:

- Operational

- Gathering plant status information

- Ready to receive turnover of state and county notification and Protective Action Recommendation responsibilities at the Emergency Coordinator's convenience.

__ Review definitions in Section 2 of this procedure.

NOTE:

The following step may be accomplished by conducting a Time Out or by verifying the level of readiness with the individuals in the positions.

__ Verify the following positions, at a minimum, are ready to activate and prepared to perform the next offsite agency notification.

__ Accident Assessment Manager

__ Radiological Assessment Manager

__ Lead Off-Site Agency Communicator

. t EOF Director/Assistant EOF Director Checklist SR/0/ A/2000/003 Page 5of15 NOTE:

The Emergency Coordinator or Assistant Emergency Coordinator should fax the Emergency Coordinator Turnover Checklist to the EOF. The "Emergency Coordinator Turnover Checklist" is provided on page 15 of this enclosure.

__ IF a classification change occurs during turnover, THEN suspend turnover until CR OR TSC declares and transmits notification to offsite agencies.

__ Receive turnover from Emergency Coordinator or Assistant Emergency Coordinator utilizing the "Emergency Coordinator Turnover Checklist" or equivalent.

Prepare or delegate to Assistant EOF Director preparations for briefing NRC by completing job aid in Enclosure 6.26 NOTE:

The EOF Director is responsible for approving Protective Action Recommendations, and approving Oflsite Agency Emergency Notification Forms after the EOF is activated. These responsibilities remain with the EOF Director and shall not be delegated.

__ Inform Emergency Coordinator that EOF is ready to activate.

NOTE:

For all drills, messages should be preceded with "This is a drill. This is a drill."

__ Announce over the EOF public address system:

"Attention all EOF personnel. The EOF was activated at hours. This is


* I am the EOF Director and have taken responsibility for emergency management from the Emergency Coordinator in the Technical Support Center. At this time, the EOF has command and control for off site notifications. protective action recommendations.

field monitoring, and offsite agency interface. The current emergency classification is The following is a summary of the plant status Additional information will be provided to you as conditions change. The next offsite agency notification shall be transmitted by hours. The EOF staff shall prepare for a tin,1e-out and a roundtable discussion at hours."

___. IF AT ANY TIME there is a need to deviate from nonnal work practices, THEN refer to AD-OP-ALL-1000, Conduct of Operations. Attachment 7, Deviations from Nonna} Work Processes/Requirements Documentation. to document the deviation. { IER L 1-13-10)

__ Review current emergency classification with EOF staff and verify it meets criteria in:

o Catawba RP/O/ A/50001001

.QR

  • ~

McGuire RP/O/ A/5700/000 QR Oconee RP IOI Al 1000/001.

.1 EOF Director/Assistant EOF Director Checklist SR/0/ A/2000/003 Page 6of15

__ IF a Hostile Action Based (HAB) event.AlYll an Incident Command Post (JCP) has been established, THEN ensure EOF communications with Control Room and Operations ICP Liaison as follows:

NOTI~:

o.

Catawba Operations ICP Bridge Line 9-803-701-5708 (Spare ICP Bridge Line 9-803-701-5800).

~ McGuire Operations Bridge Line 9-980-875-4500.

o Oconee Operations ICP Bridge Line 9-1-864-885-4908 (Spare ICP Bridge Line 9-1-864-873-4905).

I. The first message from the EOF should include EOF activation time on Line 12.

2. IF data changes during review of the emergency notification form, it is a good practice to require the EOF staff to do a "clean sweep" through the form prior to approval.

.1 EOF Dfrector/Assistant EOF Director Checklist SR/0/ A/2000/003 Page 7 of I 5

__ Notify Offsite Agency Communicator to make emergency notifications according to the following schedule:

          • -*----------------------------~

Initial Notifications I. Initial notifications to the State(s) and counties must be made within 15 minutes of the event declaration time using the Emergency Notification form (ENF}.

2. For an upgrade in classification prior to or while transmitting an initial message:

-The notification for the lesser em~rgency classification must be made within 15 minutes of the lesser classification declaration time.

-The agencies must be infrmned that an upgrade in classification will be coming.

-The upgraded classification message must be transmitted within 15 minutes of the upgraded classification declaration time.

3. Initial messages in the General Emergency classification that involve an upgrade in PA Rs must be communicated to the offsite agencies as soon ns possible and within l 5 minutes.

Follow-up Notifications I. Follow-up notifications to the State(s) and Counties must be made according, to the following schedule:

Catawba McGuire Oconee

-For NOUE, ALERT, SAE, or GE,

-For NOUE, every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> until the

-For NOUE, a follow-up is not every hour until the emergency is emergency is terminated.

required.

terminated.

-For ALERT, SAE, or GE,

-For ALERT, SAE, or GE, every 60 Catawba

-If there is any significant change to the situation (make notification as soon as possible).

every hour until the emergency is minutes until the emergency is terminated.

terminated.

OR McGuire

-If there is any significant change to the silu:.ition (make notification as soon as possible).

Oconee

-If there is any significant change to the situation (make notification as the change occurs). See NOTE*

below for examples of changes.

........... -~~------~~---~--~*-*~---~---~~~~----~~~~~~~--~

Catawba

-As agreed upon with an Emergency Management official from eac.h_individual agency.

Documentation shall be maintained for any agreed upon schedule change.

-The interval shall not be greater than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to any agency.

OR McGuire

-As agreed upon with an Emergency Management official from each individual agency. Documentation shall be maintained for any agreed upon schedule change.

-The interval for ALERT, SAE, or GE shall not be greater than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to any agency.

Oconee

-Required every 60 minutes from the notification time on Line 14 for ALERT, SAE, or GE.

-This frequency may be changed at the request of offsite agencies.

  • NOTE (Oconee): Examples of significant plant changes include: evacuation/relocation of site personnel, fires onsite, MERT activation and/or injured personnel transported off'iite, chemical spills, explosions, Condition "A" or "B" for Kemvee Hydro Project Dams/Dikes, or any event that would cause or require offsite agency response.
2. If a follow-up is due and an upgrade to a higher classification is declared, there is no need to complete the follow-up ENF. In this case, the offsite agencies must be notified that the pending follow-up is being superseded by an upgrade to a higher classification and information will be provided.

.1 EOF Director/Assistant EOF Director Checklist SR/0/ A/2000/003 Page 8of15

.,,..---"IF' AT_A~Y TIME Site Area Emergency is declared, IHEN consult Accident Assessment Manager and Radiological Assessment Manager to detem1ine potential zones for protective action recommendations.

__ IF AT ANY TIME General Emergency is declared, THEN EOF Director shall IMMEDIATELY (within 15 minutes) make Protective Action Recommendations to offsile agencies on Emergency Notification Form (ENF) using:

o.2 - Catawba Offsite Protective Actions D.3 - McGuire Offsite Protective Actions D.4 - Oconee Offsite Protective Action

__ IF changes lo Protective Action Recommendations are approved by the EOF Director. THEN ensure changes are transmitted to offaite agencies within 15 minutes.

CA lJTION:

If a zone has been accurately selected for evacuation, it shall remain selected.

__ Evaluate specific plant conditions. offsite dose projections. field monitoring team data. and determine need to update Protective Action Recommendations.

__ Rc\\*iew dose projections with Radiological Assessment Manager to determine if Protective Action Recommendations arc required beyond the I 0-mile EPZ.

__ IF Protective Action Recommendations are required beyond l 0 miles. THEN notify the states and counties to consider sheltering/evacuation of general population beyond I 0-mile EPZ.

NOTE:

Descriptions of Kcowee Hydro Dam/Dike Imminent Failure/Potential Failure are provided in.21.

__ lF Imminent Dam Failure (Keowee or Jocassee) exists, THEN make Protective Action Recommendations to Oconee County and Pickens County for imminent/actual dam failure on Emergency Notification Form Line 6 (Other):

Move residents living downs/ream of the Keowee Hydro Project dams to higher ground Prohibit trqfftc.flow across bridges ident{fied on your inundation maps until the danger has passed

.1 EOF Director/Assistant EOF Director Checklist SR/0/ A/2000/003 Page 9of15

__ Communicate, or delegate to the Assistant EOF Director the responsibility to communicate, plant status to County Directors of Emergency Management, State Liaisons or State Directors of Emergency Management:

EOF Stale Liaisons communicate information from EOF Director to County/State representatives using the Duke Emergency Management Network (DEMNET).

NOTJ13: I. Detailed instructions for the use of the DEMNET Ethernet Phone are provided in AD-EP-ALL-0406, Duke Emergency Management Network (DEMNET).

2. All agencies for a specific site can be contacted on DEMNET using the appropriate DEMNET Plant Name "DL-ALL Call" on "DL-EOC Only" pre-designated group call.
3. A specific agency for a particular site can be contacted using a DEMNET point-to-point call.
4. State and County telephone numbers can be obtained from the appropriate site's Emergency Telephone Directory.

o Use DEMNET OR EOF Director/Assistant EOF Director telephone to contact appropriate states/counties.

Catawba Site Specific York ___________________ _

__ Mecklenburg ________________ _

Gaston McGuire Site Specific

__ Mecklenburg Gaston Lincoln------------------

Iredell Cabarrus------------------

NC _______________ _

Oconee Site Specific

__ Oconee County ______________ _

__ Pickens County ______________ _

SC ___________________

~

.1 EOF Director/Assistant EOF Director Checklist SRJO/ A/2000/003 Page 10of15

__ IF Protective Action Recommendations have been provided to the States and Counties, TH~:N request protective action decision information from the State Director of Emergency Preparedness (SDEP) AND County Director of Emergency Preparedness (CDEP):

Zones Evacuated: ~--------------------~

Zones Sheltered:

Information Received from: ---

Inform Emergency Coordinator OR Assistant Emergency Coordinator of SDEPs and CDEPs protective action decisions and other offaite conditions.

NOTE: Wireless mikes are available for use during round tables/timeouts. {3 8}

__ Perfonn the following steps as needed throughout the event:

o Conduct a time-out and hold a roundtablc discussion approximately every hour, coordinated with the TSC with the EOF staff using Enclosure 6.23 to discuss:

- Emergency Classification

- Protective Action Recommendations

- Emergency Noli fication Form status

- Offsite dose projections

- Mitigation strategies

- Termination criteria as defined in Enclosure 6.5.

o Ensure roundtables/time-outs enable EOF members to know what is going on, what to anticipate, and understand focus and priorities.

o Announce to the EOF the emergency classification, plant status, and priorities via the EOF public address system following EOF time-outs.

e Emergency Coordinator or Assistant Emergency Coordinator updates may be broadcast on EOF public address system.

Advise Emergency Coordinator or Assistant Emergency Coordinator of:

- All aspects of the emergency situation, including alternate strategies outside of procedures as plant conditions dictate

- Emergency Classification changes

- Protective Action Recommendations changes

- Mitigation strategies

- Contingency plans.

.1 EOF Director/Assistant EOF Ufrector Checklist sRJ01 A/20001003 Page l I of 15 NOTE:

1. l OCFR50.54(x) states that a licensee may take reasonable action that depa11s from a license condition or technical specification in an emergency, when this action is immediately needed to protect the health and safety of the public and no action consistent with license conditions or technical specifications that can provide adequate or equivalent protection is immediately apparent. Ultimate responsibility for plant response in an emergency resides in the highest authority in the chain of command of the facility licensee available to make a decision about the response. The on duty OSM should be consulted and his concurrence obtained before invoking I OCFR50.54(x).
2. Examples of potential 1 OCFR50.54(x) action items include:

- Deviation from an Emergency Procedure.

- Rerouting system piping to temporarily restore system flow.

- Re-alignment of electrical power systems outside of procedural guidance.

- Using mitigation strategies not established by the SAMG guidelines.

3. !Ethe TSC is activated. the TSC Emerge1icy Coordinator makes the decision to invoke 1 OCFR50.54(x).

o WHEN restoring power in a LOOP event. THEN have the risk significance of power restoration assessed for risk potential by Accident Assessment personnel.

o Authorize emergency worker extensions if the radiation exposure doses arc expected to exceed the blanket dose extension limits authorized by the Radiation Protection Manager using:

- Catawba RP/O/ N5000/018

- McGuire RP/O/ A/5700/020

- Oconee RP/O/B/l 000/011.

NOTE: The Emergency Action Level descriptions on Line 4 of the Emergency Notification Form have been pre-screened.

!Ethe event involves a security tlu*eat, THEN consult the job aid, Nuclear Security Approved Messages for Security Related Events/Issues," in the EOF Director's notebook for guidance in developing remarks for Line 12 of the Emergency Notification Form.

NOTE: Personnel without badge access will need to be escorted into the EOF by the Assistant EOF Director. EOF Emergency Planner, EOF Services Manager, or their Mentor. [61]

Approve personnel with training deficiencies prior to their participation as EOF staff members. This approval shall be documented in the EOF Facility Log.

Document personnel escorted into the EOF in the EOF Facility log.

Turn over EOF Director duties to the Assistant EOF Director prior to leaving the EOF Director's Area.

.1 EOF Director/ Assistant EOF Director Checklist SR/0/ N2000/003 Page 12of15 o IE necessary to relieve Duke Energy personnel, THEN request environmental surveillance support perso1mel from DOE Radiological Assessment Plan by contacting DOE - Savannah River Site.

Periodically review the staffing levels in the EOF to ensure adequate resources are in place lo deal with response/recovery, and direct the EOF Services Manager to coordinate with the appropriate department. agency. or companies.

. o !E events affect more than one nuclear site, THEN refer to the multi-site event staffing chart in the Oconee Emergency Plan. Figure B-11 o

IF a beyond design basis external event (BDBEE) or extended loss of AC power (ELAP) event impacts multiple units at a single site, THEN evaluate the need for unit-specific responses (e.g., SAMG, EDMG, FSG, etc.) and unit-specific response teams. {IER L-1-10}

NOTE:

The job aid, "Questions Corporate Communications may ask (based on initiating event)." is available in the EOF Director's notebook for guidance.

o Provide information to Corporate Communications for news releases.

o !E EOF needs to be cvncuated. THEN refer to EOF Evacuation Checklist in Enclosure 6.22.

____ Verify EOF Emergency Planner completes "EOF 24-Hour Staffing Log" in Enclosure 6.15.

-. -***-* IF needed. THEN conduct turnover for on-coming shift.

__ Assist TSC Emergency Coordinator or Assistant TSC Emergency Coordinator as a Decision

. Maker upon entry into Severe Accident Management Guidelines (SAMO). (Catawba and McGuire)

__ Refer to Enclosure 6.5 (Emergency Classification Downgrade/Tem1ination Criteria) for guidance to downgrade or terminate an emergency event.

NOTE:

The offsite Recovery Organization will stay at the EOF and work with the counties and states ifradiological conditions exist beyond the site boundary. The On-Site Recovery Organization will be established by the Emergency Coordinator.

__ IF needed, THEN establish Recovery Organization:

D Catawba RP/O/ NS000/025 D

McGuire RP/O/N5700/024 o

Oconee RP/O/B/l 000/027 and guidance in Enclosure 6.20.

.1 EOF Director/Assistant EOF Director Checklist Terminate the emergency event in accordance with applicable procedure:

__ Notification of Unusual Event ci Catawba - RP/O/A/5000/002 o

McGuire - RP/O/A/5700/001 o

Oconee - Page 14 of this enclosure

__ Alert Catawba - RP/O/ A/5000/003 o McGuire - RP/O/A/5700/002 o

Oconee - Page 14 of this enclosure

__ Site Arca Emergency o

Catawba - RP/O/ A/5000/004 o

McGuire-RP/O/A/5700/003 o

Oconee - Page 14 of this enclosure

__ General Emergency o

Catawba - RP/O/A/5000/005 o

McGuire - RP/O/ A/5700/004.

o Oconee - Page 14 of this enclosure SR/0/ A/2000/003 Page 13of15

    • H*******--~Y *******HH***-****H******----*--¥¥*****H*H*----*---*w****H*H*H-----***H*****--*-~~*v*----- ********----*---*

NOTE:

During declared emergencies, Duke Energy docs not need to meet Fatigue Rule Work Hour Controls. Once the declared emergency or the unannounced drill has been terminated, ALL HOlJRS worked during the declared emergency will he included in future work hour calculations, including the determination of minimum breaks between shifts. (69}

Announce the following:

"Covered Workers need to ensure that all hours worked during an augmentation drill or a declared emergency are entered into EMPCenter prior to leaving the site. Supervisors should consider the need for to initiate a waiver in EMPCenter per AD-SY-ALL-0460, Managing Fatigue and Work Hour Limits."

__ Conduct a critique following tennination of drill or actual event.

__ Provide all completed paperwork to Emergency Preparedness following tennination of a drill or actual event.

.1 EOF Director/Assistant EOF Director Checklist Close out an Oconee emergency event as listed below:

SRJO/ A/2000/003 Page 14of15

__ l.E an event meets termination criteria for General Emergency in Enclosure 6.5, Emergency Classification Downgrade/Tennination, THEN inform NRC Site Team Director (STD) and SDEM that termination criteria have been met.

Secure agreement from the two directors to terminate the event.

Document names and time decision made below.

SDEM NRCSTD Telephone Number 9-1-803-737-8500 (In person in EOF) o Request lead Offsite Agency Communicator to complete Termination Message and transmit it in accordance with SR/O/A/2000/004 (Notification to State and Counties from the Emergency Operations Facility) and terminate the emergency.

__ IF terminating from an Unusual Event. Alert, or Site Arca Emergency. THEN o

Request lead Offsite Agency Communicator lo complete Termination Message and transmit it in accordnncc with SR/O/ A/2000/004 (Noli Ii cation to State and Counties from the Emergency Operations Facility) and terminate the emergency.

o Notify the following agencies:

SDEM OR.

Telephone Number 9-1-803-737-8500 IF the SEOC has not been activated, the County Emergency Management Directors (CEMD)

Oconee CDEM _______ _

Pickens CDEM ~-~------

Telephone Number 9-1-864-638-4200 9-1-864-898-5943

__ IF terminating from an emergency involving dam failure (Keowee or Jocassee),

Discuss tennination with Hydro Central (Refer to Section 6 of the Oconee Emergency Telephone Directory, Keowee Hydro Project Dam/Dike Notification).

__ Request Oconee Emergency Preparedness to provide a copy of the Licensee Event Report (LER) to state and county agencies at the time it is sent to the NRC.

.1 EOF Director/Assistant EOF Director Checklist

.Suttiun: (

) CNS lMNS

)ONS T1m1i*-.*t'r: lcfrdc} (Fram}: CiR TSC {TO}

TSC EOF Unil{s) Am:<:U.'il; (tirde)

IZ Uni1 t llnit;?

I Com !'re>>

R.-< Ccol Ptess I

Ct>lll l'rcss lb: Cool Press ll'xPU\\\\'C1 I

Unit S1atus UmtSt.:ilus Unil St-ltu:;

~b;or Eqmiuncttt Out nfS.:n:1cc i'>t:i.io!' Equipmem 0;1t of Service Nn NJ,\\

ERDS Activ;11Cd Yes:

E!UJS :\\tU\\'jlcd Yes Rea.,:on YES NO

-..'OUE Dt.-cl:m:;t m

YES NO

.*\\lt?rt Occfan:.d S,\\E DecJ.;ued ;\\l

~!WICAL D FlRE OTHER G E Pi,::dared.:u LAW E~FORCEM8'.'T D

Rdc.1s~ u1 Pwgn.. ~s YES NO Field Mor.1tonns Teams Dep1o'.ic:d YESNO~fomhcr ____ _

WIND SPF.ED _____ WIND DIRECTION ------

tWFStTE PARS Ret:;;umm:nded YES NO Zoni:sfa*acu<!td _____, _________ Zones Shdtcrc:d ---------

Kl lle!:ommcnded YES Current Dose lhm Avad;tblc YES NO Have Dose A!Ssc:ss..'l:s dis:eus~cd Turuo\\'c!

YES Off..Sil4' Cnmruuniutinu: Li.st Mes.<mg::: St:nt ____

Nt...'l;t ~-lcss;age Due-----

(fmlt}

!Time}

J hixe ("ommonn:n\\(}f;;: dl!i:cm:sd Turnn... er w11h the ;it'qumng foc1hty Co.'T!mwuc."'tnrs'1 YES NO Tarlrn\\*t'r Cmrtph:-tt: YES NO -

TSClEOF Acti\\-:ited:lt -----

{drde}

!rin:l~J Tirnt!

,\\ddifiunnl lnlurm~tient:

SRJ0 I A/20001003 Page 15of15 Unl13 I R., Cool Temp I

D I

I D

Note:.2 Catawba Offsitc Protective Actions Protective Action Guides SR/0/ A/2000/003 Page 1of6 Protective Action Recommendations (PARs) for the public apply dming a General Emergency. and include sheltering, evacuation and consideration of KI use. PARs are based on plant conditions independent of projected dose, and can also be based on projected dose.

Protective Action Guides (PAGs) are levels of radiation dose at which prompt protective actions should be initiated and are based on EPA-400-R-92-001, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents. The projected dose PA Rs specified in this enclosure are based on the PAGs listed below. The PAG for Kl is taken from Potassium Iodide as a Thyroid Blocking Agent in Radiation Emergencies. FDA Guidance. November 2001 and Guidance for Industry. KI in Radiation Emergencies.

Questions and Answers. FDA. December 2002. f23}

PROTECTIVE ACTION GUIDES (PAGs)

(Projected Dose or Field Measurements)

Total Effective Dose Committed Dose Equivalent (TEDE)

Equivalent (CDE)

Thyroid

~*----

>I Rem

>5 Rem INITIALS _____ PRINTED NAME ___________ _

GE Has Been Declared (Se.e Norn l)

  • EVACUATE 2-mileRadius
  • EVACUATE 2-S miles Downwind
  • SBELTERS-lOmilesDownwind Recommend the consideration ofKI11seby thepublic Go to Enc. 6.:2, Page 3 of 6 forEXPA.'\\i'"DEDPAR.2 Catawba Offsite Protective Actions Flowchart - INITIAL PAR SRIO/A/2000/003 Page 2of6 No NOTI 1: For all P..\\Rs, affected Protectin.A.ctionZonesare definedinEnclosure 6.2, Pae.e 4 of 6 NOTE 2:RPSA criteria: Onlyapp!icabletofirnP *.\\R afterGE declaration and the following exist:

LOSS ofContaimnectBanierperRPIO A.15000 OO!{EAL Walli:hnrt)asinclicatedonTableF-1 (FissionProductBarrierThresholdMatri.~).

AleakingorRu"PTURED SG is FALl. TED outside of contilnmea Contairunectiso!auorusrequiredA."""Il EITHER a ContairunenrintegrityhasbeenlostbasedonEmergenc:yCoordinatorjudgmem o u?\\l:SOL.:\\BLE pathway from Ccntammentto theem:irocmect exists Indications ofXCS leakage outside of C ontlmm ent

  • .\\i'\\1) EITHER:

l)POTE:NTI.o\\LLOSS oftheContaimnentBanierperRP 0 *.\\.

EMF53Aorj3B readingattim e Slflce shutdov.n a c Table F-2) as indicated by C ontainm e:ntRaCiationMonitor Time after SI]}

a.IT Potential Loss Ohr-lhr 5500 R1u-lhr-Thr

~000 Rbr 2hr tn Shr 1600 R ]t(

> Shr 1000 Rhr OR

2) There is a significantradiologicalreleaseproiected to exceedPAGsatthe site bounclazy"ithin anhourasindicated byRP 0 A<~OOO.QOl (E.o\\L W:illchartRG U,RG L2 orRG 1-3).

Va!idreaclingon 1 2D1F36H effluemraciiauonmoIJitor> 2.'.! lE-.L c:pm for<:: 15 min.

Dose:issessnentusingactualm eteorologymd!~ates doses"' 1000 mRem TEDE or5000 mRem ~roid CDE at orbeyond the SITE BOUND...\\RY.

Field survevresultsindicate EITHER of th~ followm:<at orbevondthe SrIE BOli!\\U.'lli Y:

Q ciosedmndowdoserates> 1000mR.t1Jte:;:pectedtoco!lllnuefor~60 min a

  • .\\nalysesoffieldSUC'-*evsamplesmd1carethyro1dCDE

'i mRem for60min. of inhalation.

!E RPSA Conditions CA"l:'NOTbe confirm ed. THE°" an,*er (Se.e Note l)

  • SfilLTER2-mileRadius
  • SHELTER 2-5 miles Downwind

~B

'A,,

lt; Recommend the consideration ofICI use by the public

1

(See Note I)

  • EVACUATE 2-mileRadius
  • EVACUATE 2-5 miles Downwind

~*1~-...... ~

  • R**

.2 Catawba Offsitc Protective Actions Flowchart - EXPANDED PAR SRJO! A/20001003 Page 3of6 Note l: Forall P *

.\\Rs~ affected Proreclive Action Zones (Zones) are defined in Encl();;ure 62., Page 4 of 6.

IF a Z:me has heen aceurarely scli::(;red for evacuaEiOll, it shall ~

selecred.

From Il'i1TIAL PAR Enc.. '6.2, Page 2 of 6 Contiu.11ou.s Assessment Note 2: A short-term release is e that can he aoomi.rely projccffd t-0 h-e < three hours and cootrolled by the liem.<>ee. This oonsideratio:n would t:ypica1t~' apply !Do controlled veruing of oontainnteitt Note 3: Plant c.ondmonse.-.:ist which would require the classificalion ofa G:e:nE!al EmEigency pe-r Ute E.t\\L:i. 111b dac:; NOT include co:n:i:idcmtioo of aff:iim aa-~e-bim:.d EAL:>.

Evnlw.im PAR ba:ied Of!. ch.rui_ge:; m ll.11.yof the follo-..,*i:ng:

A Is thi:re a Hostile Aerioin Based f\\"*ent in progress'!

Yes No (Seel\\!ote 1)

  • SHELTER2:-mile Radius
    • SHELTER2-5 miles Downwind
  • SHELTER additional Zones that exce00PAGs

~

Is: there a shMt-am rel~e m progress?

(S~Nvte:?)

Yes No In<:r->...ase in dcm: assasroi~tprojecred values.

In~e in field measurdllent values.

Shift in. 15-minure avera?:e ""ind direclion resuttiue: in additional :znnes heing affected.

~

Ter:1ninafam ofac-Eive hosfile aciion against the sire.

IF RPSA, when s:afor to do so consider e-.;,.*acua!ion of shelt;;rro zones ha.."-Od upon radiological assessment and llh\\;U:::ril11!:; wilh Olliil:: Ai:;:m1..i:::>.

/

Couditi~? *

~No

.( G(~ee ~orey Are offsite tfo.se proj~tions <lf field

mca~=m.-:!lb greatcr th!lll PA Gs?

No

/

Yes (See Note 1)

  • EVACUATE 2-mife Radius
  • EVA<CUATE 2-5 miles Downwind Yes EVACUATE Zones that exoeee<f

?AGs. !f projected dose or field measurements 2: 5 rem CDE Th1yroid then recommend the

.. ()l};Mideration of Kl us:e by the pwt>!ic.

INITIAL.2 Catawba Offsite Protective Actions SR/0/ A/2000/003 Page 4of6 CAUTION:

A short term release is any release that can be projected to be 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> or less in duration.

An example would be a "puff release". A controlled release is one that can be stmted and.

stopped at the licensee's discretion, such as the venting of Containment for pressure control. !Ea release is short term AND controlled, sheltering in lieu of evacuation should be considered. {36}

NOTE:

1. If necessary, obtain needed data from one of the following sources in order of sequence:

A. Catawba SOS (Group Display "EMF")

B. Duke Energy Meteorologist (2-0139. 3-7896, OR 2-4316)

C. National Weather Service in Greer, S.C. (9-1-864-879-1085, 9-1-800-268-7785

2. OAC/SDS wind direction can be displayed as greater than 360 degrees. To arrive a! wind direction for table below. subtract 360 from wind direction indications greater than 360 degrees.

IF AT ANY TIME a General Emergency is declared. TH$N make immediate PROTECTIVE ACTION RECOMMENDATIONS (PARs) within 15 minutes to be entered on Linc 6 of the Emergency Notification Form (EN F). Dete1111ine the PA Rs based on the 15-minute c:iverage upper wind direction (OAC point CI P0250) as below:

Protective Action Zones Wind Direction 2-Mile Radius 2-S Miles Downwind 5-10 Miles Downwind (RPSA Only) 348.75 - 11.25 AO Bl.Cl.DI B2,C2,D2 11.26 - 33.75 AO Cl, DI C2,D2 33.76 - 56.25 AO Cl, DI, El C2, D2, E2 56.26 - 78.75 AO Cl, DI, El, Fl C2, D2, E2, F2 78.76 - 101.25 AO Cl, DI, El, Fl 02, E2, F2 101.26-123.75 AO DI, El, Fl D2, E2, F2, F3 123.76 - 146.25 AO El, Fl E2, F2,F3 146.26-168.75 AO Al, El, Fl A2, E2, F2, F3 168.76 - 191.25 AO Al, El, Fl A2, F2, F3 191.26-213.75 AO Al, Bl,EI, Fl A2, A3. 82, F2, F3 213.76 -236.25 AO Al, Bl, Fl A2, A3, 82, F2, F3 236.26 - 258.75 AO Al, Bl, Fl A2, A3, 82, F3 258.76 - 281.25 AO Al,81,CI A2, A3, 82, C2 281.26-303.75 AO Al, 81,CI A2, A3, 82, C2 303.76 - 326.25 AO Bl, Cl A3, 82, C2 326.26 - 348.74 AO Bl, Cl, DI B2,C2,D2

.2 Catawba Offsitc Protective Actions sRJ01 A/20001003 Page 5of6 NOTE:

!E changes to the initial Protective Action Recommendations are recommended, THEN these changes must be transmitted to the offsite agencies within 15 minutes.

CAUTION:

IE a zone has been accurately selected for evacuation, THEN it shall remain selected.

__ IF dose projections indicate that COE Thyroid dose will be 2: 5 Rem, Tl*lli:N recommend KI use by the General Public in accordance with State Plans and Policy. {23}

Evaluate specific plant conditions, offsite dose projections, wind direction, field monitoring team dala, and assess the need to update Protective Action Recommendations made to the states and counties in the previous notification throughout the event.

Review dose projections with the Radiological Assessment Mmrnger to determine if Protective Action Recommendations are required beyond the I 0-mile EPZ.

!E Protective Action Recommendations are required beyond I 0 miles. THEN notify states and counties to consider sheltering/evacuating general population located beyond the affected I 0-mile EPZ.

Gastooeo..2 Catawba Offsite Protective Actions Catawba Protective Action Zones mile EPZ (2 and 5-mile Radius, inner circles) 0 2

4 6 Mies

--~-*,*--**

r.~. ~~-

SRJ01 A/20001003 Page 6of6 i "

Note:.3 McGuire OffsUe Pl'ot'ective Actions Protective Action Guides SR/0/ A/2000/003 Page 1of6 Protective Action Recommendations (PARs) for the public apply during a General Emergency, and include sheltering, evacuation and consideration of KI use. PARs are based on plant conditions independent of projected dose, and can also be based on projected close. Protective Action Guides (PAGs) are levels of radiation dose at which prompt protective actions should be initiated and are based on EPA-400-R-92-00 I, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents. The projected dose PARs specified in this enclosure are based on the PAGs listed below. The PAG for KI is taken from Potassium Iodide as a Thvroid Blocking Agent in Radiation Emergencies. FDA Guidance, November 2001 and Guidance fotJndustry. Kl in Radiation Emergencies. Questions and Answers. FDA, December 2002. (23}

PROTECTIVE ACTION GUIDES (PAGs)

JJ?_~jected Dose or Field Measure1~_1ents)

Total Effective Dose Committed Dose Equivalent (TEDE)

Equivalent (CDE)

Thyroid

?::,.1 Rem

?::,.5 Rem H¥~.. *~--*-*

INITIALS ___

PRINTED NAME ___________ _

.3 McGuire Offsite Protective Actions Flowchart - INITLl\\.L PAR SR/0/ A/2000/003 Page 2of6 GE Has Been Declared (See Notel)

., EVAC:UATE. 2-mile Radius

  • EVACUATE 2.-5 mile:; Downwind
  • SHELTER.5-10 miles Downwind Recommend the consideration of Kl use by the public.

Goto Enc:.6.3,PageJ of6 forEXPAJ\\il)EDPAR No

~Q

tp" !

(~~*,;

Note 1: For all PAR.s, aff e:ted Prote:tive Action Zone; (Zones) are defined in Enclosure 6.3. Page 4 of 6.

Note 2: Off site z.gencies have provided prior knowledge of off site i:npediments to evacuation (such as flc-O<iing, bridge/road closures, adverse weath;;r. traffic control not in place, etc.) Al'\\"D specifically requested that the site :."OT issue an evacnation PAR.

Nott: 3: RPSA criteri~ Only Applicable to fa;t ?AR after GE Decla:ation Al"\\l) t\\vo af thefollowhg exist from EAL Wdlchart (IF RPSA conditions can !\\OT be cocl'hmed, Tl1IN ans\\ver NO):

L LOSS of Prim<?L)' C:m:ai:im~t Barrier ft!!' Table F1 {Fission Product Barrier Threshold Matri."{).

Al'i"'D

'.!. POTEl'.fIIAL LOSS of Containment Barr'.er per Coat2inment Radiation Monitor EMF51A er E:MF51B per Table F'.l (Conhiinment Rc.diativnR1!!!:EME' :5 lA&B).

QR There is asignificam radiological rdease p:ojected to exceed RG l EA.L at ilie site boundary within an hour, Yes (See Note I)

  • SHELTER2-mile Radius o SHELTER2-5 miles Downwind

.,'If,:

A.

!:jR*'

Yes Recommend the consideration cfl!Ell.;acematalvsel~:d for a;,;acu:aticn... th'21l.itshall remain se1,:ct.;:d.

Note 2*: Omitaaioaiicie;i hz.,,._., pro*-i~ priork:oow1'3!iga ofoffiitaimpm:i:m::n13 to e*."2cm.ticn

{such as fkiooing,.b:ridga.lroad clo=~,ad -~~ w.aatl:er, tr.I.me coo.trol not in puca, ate.).t'\\"D s~:cificaUyr.:qis2st-e-G thatthesie NOT issua an a'i.~tioo P.~..R.

Note3: A short-'t:im rei'il?Se is OOE: th:at=b.;;, 2=tE1y proj~Ed to be< three hour. md co:nlrcll.:C hv tha license=. 'Thill consideralio:n v;omd typically ;applyto rontrclled ventin:: ofca:nt:2iru:nant.

Nate4: Plant comlliimuexi-stwhie:h....-out& reqi;U-a thecbssi~cationofa G'.!n~I Em=rg:i:i::yi:r=r the Bl.Ls. 'This doos NOT inclooeeomida!atim ofoffiit::aosH:as:i E..~s.

offiie imp~im::nt to e-v-ac.u:atin:n?

(Sc:No*tel)

Y.:s (See Motel)

" SHELTER:2-mileRadiu:s

[See f*Iate 1~

From.INITBL PAR Enc. 6.3,Page:1 of6 Co.ntimmus As..essment E valu.a~ PAR baz:i onckIDg'=S :Ui atty of th: foll°""io,g:

fua-.::-.sa :Ui dcs2.a;ses:SilE:Ol:pt"qji::et-:!t *r.llue;:.

fucrezse:Ui fieldma;sll!"emmt>-21.u.;,s.

Shift in 15-:in.i!mt::zv~e v.-in6 di:ecticnras'!>lti:agin

.;add:itiCiJ21 ZOO!::S bei:ng zff-=ct.;:d.

Offait:: agencies :infoan th: $it:t:lutoffiite im~

no 1m:iger.::xis t T~onofai:cti**e ha;til.;;::a;::timi.~ttb.:.sit::

  • IF R=.

h

~

... b.Ji.fi; it;

n_s::.!"=:*toao-ro;om1.~e"-::a.<:t:.-.ati.cno"E:,.

sh=1.t:r:e zones o;a;;e upcnn41tcl.og:ical as-o-5smeol:200-ci3*::i;sst<l:l.S with 0£fcite Agenci~.

-~...!!!: omit: dose proj:etions or field m;:a$ ur.:m=ot3 gre;at:r t1un No

  • SHELTfR 2-5 miles D<lwnu1rnd
  • EVA'CUATE2-mHelladJ!!.S

'EVACUATEZ<tn:esthat:'l!!Xceed PA£s. lf;projei::teddo.searfiefd mEiliSurements ~ 5 re:mCD:E Thy.mid then :r.ei:-ommend the i:ansideraticmcf!Klmehythe-public.

  • SHEi!. TER addit:iCJmiJ Zones that excee<!PA<:is
  • CVACUA1'E2-5 miles Dilt<mwimf

INITIAL Endosurc 63 McGuire Offsite Protective Actions sRJO! tV20001003 Page 4of6 CAUTION:

A short *.~rm release is any rdeas*. Lhat can be projected to be 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> or less in duration.

An exa:,ple would be a "puff rek.. se 11

  • A controlled release is one that can be started and stopped :l the licensee's discretio1 *. such as the venting of Containment for pressure control. _IF a release is short term AND controlled, THEN sheltering in lieu of evacuation should! :: considered. {36}

...,.,.---=---=-=---- --------****------------------------.

NOTE:{S} Jfnecessar obtain needed data fro1r,111e of the following sources in order of sequence:

A. McGu

  • ~ SDS (Group Display 11

\\.tJ.F")

B. Duke* -iergy Meteorologist (2-C'; 39, 3-7896. OR 2-4316)

C.

Natio1.,,\\ Weather Service in Gri.'.:r, S.C. (9-l-864-879-1085, 9-1-800-268-7785 IF AT ANY T1 -:1.E a General Emergency is declared, THEN make immediate PROTECTIVE ACTION REC! \\!JMENDATIONS (PARs) within 15 minutes to be entered on Linttofthe Emergency Not* ii cation Form (ENF). Determine the PARs based on the 15-minute average upper wind direction ( U\\C point Ml P0847) as below:

Protective Action Zones Wind Direction 2-Mile Radius 2-5 Miles Downwind 5-10 Miles Downwind (RPSA Only)

.~

0.1 -22.5 l):-C.L.M D,O,R E,F,S 22.6-45.0 1:

1 2;,L,M D,O,R E,Q,S 45.l - 67.5 1".:'.',L,M D,N,O,R E,P,Q,S 67.6-90.0 LC,L,M D,N,O,R P,Q,S 90.1 -112.5 H,C,L,M N,O,R K,P,Q,S 112.6-135.0

!3,C,L,M A,N,O,R I,K,P,Q,S 135.1 - 157.5 B,C,L,M A,N,O l,K,P,Q 157.6 - 180.0 B,C,L,M A,N H,l,J,K,P*

180. 1 - 202.5 B,C,L,M A,N G,H,l,J,K,P 202.6 - 225.0 r?.:C,L,M A,D,N G,H,l,J,K,P 225.1 - 247.5

[\\.C,L,M A,D F,G,H,l,.J 247.6 - 270.0 B.. '.:',L,M A,D F,G,H,I,J 270. I - 292.5 f}:~-*,L,M A,D E,F,G,H,.J 292.6 - 315.0 B,C,L,M A,D,R E,F,G 315.1-337.5 B,C,L,M D,R E,F,G,S 337.6 - 360.0 r,,c,L,M D,R,O E,F,S

NOTE:

ICnclosure ().3 McGuire Offsite Protective Actions SR/0/ A/2000/003 Page 5of6 IF changes to the initial Protective Action Recommendations are recommended, THEN these changes must be transmitted to the offsite agencies within 15 minutes.

CAUTION:

!Ea zone has been accurately selected for evacuation, THEN it shall remain selected.

__ IF dose projections indicate that COE Thyroid dose will be~: 5 Rem. Tflli:N recommend KI use by the General Public in accordance with State Plans and Policy. {23}

Evaluate specific plant conditions, offsite dose projections~ wind direction, field monitoring team data, and assess the need to update Protective Action Recommendations made to the states and counties in the previous notification throughout the event.

Review dose projections with the Radiological Assessment Manager to determine if Protective Action Recommendations are required beyond the l 0-mile EPZ.

IF Protective Action Recommendations are required beyond I 0 miles. THEN notify stales and counties to consider sheltering/evacuating general population located beyond the affected l 0-milc EPZ.

.3 McGuire Offsite Protective Actions SR/01 A/2000/003 Page 6of6 McGuire Protective Action Zones - I 0-mile EPZ (2 and 5-mile radius~ inner circles) o" N

l

Note:

INITIALS.4 Oconee Offsite Protective Actions Protective Action Guides SR/0/ A/2000/003 Page 1 of 7 Protective Action Reconu11endations (PARs) for the public apply during a General Emergency, and include sheltering, evacuation and consideration of KI use. PARs are based on plant conditions independent of projected dose, and can also be based on projected dose. Protective Action Guides (PAGs) are levels of radiation dose at which prompt protective actions should be initiated and are based on EPA-400-RM92-00 I, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents. The projected dose PARs specified in this enclosure are based on the PAGs listed below. The PAG for KI is taken from Potassium Iodide as a Thyroid Blocking A11:ent in Radiation Emergencies. FDA Guidance. November 2001 and Guidance for Industry. KI in Radiation Emergencies. Questions and Answers. FDA, December 2002. (23}

~-----~~--~-~~~~-~

PROTECTIVE ACTION GUIDES (PAGs)

__.!E._£ojected Dose ~T. Field Measure1~1_e_nt_s"'"") --i Total Effective Dose Committed Dose Equivalent (TEDE)

Equivalent (COE)

Thyroid PRINTED NAME ___________ _

.4 Oconee Offsite Protective Actions Flowchart - INITIAL PAR SR/0/ A/2000/003 Page 2 of7 GE Has Been Declared Is this a llil.pidly Progressing Severe Accident (RPSA)

(See l\\'ote 3)

(See Note I)

  • EVACUATE2-mileRadius
  • EVACUATE2-5 milesOovmwind
  • SHELTER 5-10 miles Downwind Are offsite dose projections or field measurements:'.:: 5 rem CDE Thyroid?

Yes Recommend the consideration of Kl use by the public.

Go to Eoc. 6.4, Page3 of 7 for EXP_-\\1,"])ED PAR No No Note I: For all PAR.s, affected Protective Action Zones (PA.Zs) are defined in Enclosure 6.4, Page 5 of 7.

Note2: Offsite agencies ha\\*e prm*ided prior kno\\\\1edge of offsite impediments to erncuation (such as flooding, bridge!ro ad closures, etc.) k'-.:1) specifically requested that the site NOT issue an evacuation PAR.

Note3: RPSAcriteria:

First PAR.after GE Declaration

_-\\1,1)

LOSSofContainmentBarrierperRP!OiA!lOOOJOOl,Enclosure4.L Al' ill

--containment Radiation
vfon.itor RL.l-57 or RLl\\.SS reading e..,;ceeds Cont2inment Barrier POTEi\\"TL-U..

LOSS,EAL thresholdperRP!O/A!l000/001,Endosure4.L OR o

Radiologic21 release such that doses are projected to exceedEPAPAGs atthe site boundary within an hour(EAL4.3.G.1)

(!;IRPSA conditions can NOT be confirmed, THEN answer NO).

Is there a Hostile Action Based event in progress?

Yes No (See Note I)

. ffF, SHELTER 2-mile Radius

. :A.*;.;

  • SHELTER 2-5 miles Downwind
  • .R. r1 Is there a known offsite impediment No (See?\\otel)
  • EVACUATE2-mileRadius
  • EVACUATE2-5 miles Downwind 1

Recommendthe

<:e:,

Yes Are offsite dose projections or field measurements?:: 5 rem CDE Thyroid?

consideration of Kl

'.'A,: 1 --..

use by the public.

ifl'.

iP***
~\\.

/,R_;.

No

.4 Oconee Offsite Protective Actions Flowchart-EXPANDED PAR Note 1: For a!! PARs, affected Protective Action Zones (P_.\\Zs) are defined in Enclosure 6.4, Page 5 of 7.

IF a PAZ has been accll!ately selected for evacuation, it shall rem2in selected.

Note 2: Offsite agencies have provided prior kno\\\\1edge of offsite impediments to evacuation (such as flooding, bridge/road closures, ad\\*erseweather, traffic control not in place, etc.)_.\\.::'\\'"])

specifically requested that tliesite NOT issue an evacm!ionPAR.

Note3: A short-term release is onethatcanbeaccuratelyprojected to be< three hours and controlled by the licensee, This consideration would typically apply to controlled venting of containment.

~ote 4: Plant conditions e.'t.ist which \\>"ould require the classification of a General Emergency per the EALs. This does NOT include consideration of offsite dose-basedE_A..Ls.

Is there a Hostile Yes Is there a known off site impediment to evacuation?

(See Note2)

Yes (See Notel)

  • SHELTER 2-mileRadius No Yes (See Note1)

SR/0/ N2000/003 Page 3 of7 From Th"TTIAL PAR Enc. 6.4, Page:? of 7 Continuous Assessment Evaluate PAR based on changes in any ofthefollo\\\\ing:

Yes ice:

Increase in dose assessment proj eaed values.

Increase in field me25Ufement values.

Shift in 15-minme average wind direction resulting: in additional PA.Zs being affected.

0 ff site agencies inform the site that o ffiite i.'Ilpedimerrts no longer e.~ist.

Termination of active hostile action against the site.

IF RPS.A.., ~.-hen safer to do so consider evacu:il:ion of sheltered zones based upon radiological assessnent and discussions \\Vith Offsite Agencies.

Are offsite dose projections or field measurements greater than PAGs'..'

Yes l

~I.

No

  • SHELTER 2-5 miles Downwind
  • EVACUATE 2-mile Radius

!,,A

,,,;p,

p;* l

':!Rr,1 EVACUATE P AZs that exceed PAGs. If projected dose or field measurements~ 5 rem COE Thyroid then recommend the consideration of Kl use by the public.

  • SHELTER additional PAZs that exceedPAGs
  • EVACUATE2-S miles Downwind

) ~- '>

INITIAL.4 Oconee Off site Protective Actions SRJO! A/20001003 Page 4 of7 CAUTION:

A short term release is any release that can be projected to be 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> or Jess in duration. An example would be a "puff release". A controlled release is one that can be started and stopped at the licensee's discretion, such as the venting of Containment for pressure control. IF a release is short term AND controlled, THEN sheltering in lieu of evacuation should be considered. { 36 )-

[

TOTE: If necessary, obtain needed data from one of the following sources in order of sequence:

A. Oconee SDS (Turn On Code "EROENV")

B. Duke Energy Meteorologist (2-0139. 3-7896, OR 2-4316)

C. National Weather Service in Greer, S.C. (9-1-864-879-1085.QR 9-1-800-268-7785)

.- IF AT ANY TIME a General Emergency is declared, THEN make immediate PROTECTIVE ACTION RECOMMENDATIONS (PARs) within 15 minutes to be entered on Line (l..ofthe Emergency Notification Form (ENF). Determine the meteorological parameters to use based on the 15-minutc average wind direction (SOS "EROENV" screen) as determined from the following chart below:

'Time of Day Met First Priority Second Priority Third Priority Fourth Priority Conditions Parameter 1000 - 1600 Wind 60M reading lOM reading River Tower NWS Direction 1600- 1000 and River Wind between Wind 210° and 360° or Direction 60M reading IOM reading River Tower NWS 0° and 70° 1600-1000 and NWS River Wind between Wind 70° and 210° Direction 60M reading River Tower

.4 Oconee Off site Protective Actions SRJ0/ A/2000/003 Page 5of7

__ Detennine affected zones from chmt below based on the 15-rninute average wind direction as detennined in previous step:

Protective Action Zones Wind Direction 0-2 miles; 2-5 miles; 5-10 miles (RPSA Only) 14.1°-27° AO, Cl, Dl, El, C2, D2, E2 27.1°-42° AO, Cl,Dl,EI, D2,E2 42.1°-66° AO, Dl, El, D2,E2 66.1°-85° AO, D1, EL D2, E2, F2 85.1°-104° AO, Dl,ELFL D2, E2, F2 I 04. J 0 -129° AO, El, Fl, E2,F2 129.1°-156° AO, Al, El, Fl, A2, £2. F2 156.1°-175° AO, AL El, Fl, A2, F2 175.1°-181° AO, Al, Fl, A2, F2 181.1°-219° AO.

Al.Bl.Fl.

A2. B2. F2 219.1°-255° AO.

AL Bl.

A2. B2.

255. I 0 -27 I 0

AO, AL BL CI.

A2, 82. C2 271.1°-297° AO, BLCI.

B2,C2 297.1°-312° AO, Bl,Cl.

B2, C2, 02 312.1°-345° AO, Bl.Cl, DI, B2, C2, D2 345.1°-14° AO, Cl, DI, C2,D2

.4 Oconee Off site Protective Actions sRjO/ A/20001003 Page 6of7 NOTE:

iF changes to the initial Protective Action Recommendations are recommended, THEN these changes must be transmitted to the offsite agencies within 15 minutes.

CAUTION:

!Ea zone has been accurately selected for evacuation, THEN it shall remain selected.

__ IF dose projections indicate that COE Thyroid dose will be 2: 5 Rem, THEN recommend Kl use by the General Public in accordance with State Plans and Policy. {23}

Evaluate specific plant conditions. offsite dose projections, wind direction, field monitoring team data, and assess the need to update Protective Action Recommendations made to the states and counties in the previous notification throughout the event.

Review dose projections with the Radiological Assessment Manager to determine if Protective Action Recommendations are required beyond the I 0-mile EPZ.

!E Protective Action Recommendations are required beyond I 0 miles, THEN notify states and counties to consider sheltering/evacuating general population located beyond the affected I 0-mile EPZ.

.4 Oconee Offsite Protective Actions SR/0/ A/2000/003 Page 7of7 Oconee Protective Action Zones Mile EPZ (2 and 5-mile radius, inner circles)

Radius From Site Pickens County Oconee County (miles)

Zones Zones 0-2 AO AO 2-5 A-1,B-t,C-1 D-1, E-1, F-1 5-10 A-2. B-2, C-2 D-2, E-2. F-2

INITIAL.5 Emergency Ciassification Downgradcffcrmination Criteria NO Is the need for a long term cleanup or a*ccovery organization anticipated?

NO

"'<,,~

Do the conditions for the "'-:."'-

current emergency classification still exist?

NO ls the current emergency classification a General Emergency?

  • ~

YES Page2 Pagc2 Do not terminate and continue to monitor the classification procedure:

Catawba RP/O/A/5000/001 J\\lcGuirc RP/0/A/57110/000 Oconee RP/O/MI 000/00 I.

. YES

. f.

  • ~
      • --,<\\'
  • ----* --*~~* Pagel YES Do the conditions~*"-.

11 lower classification

"'-;* ----'----e..i exist?

clnssificution.

NO Terminate all emergency classification..

sRi01 A/20001003 Page I of3 INITIALS ___ _

PRINTED NAME ___________ _

.5 Emergency Classification Downgradeff crminntion Criteria Sf{J0/ A/2000/003 Page 2of3 Yes Terminate the current ctassiflcation and declare the plant in recovery l No Continue with the currant classification until a recovery can be declared

___,_Security threat has been contained.

Tnhlc I r-No new evacuation or sheltering protective actions are anticipated.

__ Containment pressure is being maintained less than design pressure.

__,_Containment hydrogen levels are less than 9% and stable or decreasing.

__ Decay heat rejection to the ultimate heat sink has been established and is stable. This is indicated by either of the following (circle one):

Decay heat removal is considered stable if supported by redundancy or diversity

- Examples ofa satisfactory state include:

- 2 trains of systems for sump recirculation.

- 2 trains of Decay Heat Removal (DHR)

- I train of OHR and the ability to cool with the steam generators.

- steam generator cooling with 2 trains of feed capability.

QR Decay heat removal is considered stable if no additional fission product barrier challenges would be expected for at least 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> following interruption of core cooling.

(continued on next page)

__ The risks from recriticality are acceptably low.

.S Emergency Classification Dowugradcff crmination Criteria

__ Radiation Protection is monitoring access to radiologically hazardous areas.

__ Offsite conditions do not limit plant access.

SRJO/ A/2000/003 Page 3of3

__ The Public Information Coordinator, NRC officials, and State representatives have been consulted lo determine the effects of termination on their activities.

__ The recovery organization is ready to assume control ofrecovery operations:

Catawba - RP/O/B/5000/025 o

McGuire - RP/O/A/5700/024 o

Oconee - RP 0/A/I 000/027

.6 Radiological Assessment Manager Checldist

--~ITIAL SR/01 A/2000/003 Page 1of5 NOTE:

Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.

I_F reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.

__ Don position badge.

__ Log in to RAM computer.

__ Log into WebEOC.

__ Sign in on Sign Jn board.

__ Obtain copy of AD-EP-ALL-0202, Emergency Response Offsite Dose Assessment.

-*-IF Field Monitoring teams have been dispatched, THEN ensure FMC has established communication with Field Monitoring teams.

__ Notify EOF Director that Radiological Assessment Manager (RAM) position is operational.

__ Ensure all Radiation Protection personnel reporting lo the EOF sign in on Sign In board.

__ Ensure that EOF Dose Assessors are kept informed of pertinent plant information including, but not limited to:

I)

Time o:f TSC activation

2)

Time of EOF activation

3)

Time of reactor trip

4)

Status of safety injection

5)

Status of onsite radiological conditions

6)

Time next emergency notification message is due.

__ Establish Position Log of activities sufficient to conduct turnover for on-coming shift.

__ Communicate to EOF Director:

1)

Any release in progress, including dose rates (especially at the site boundary)

2)

Field Team status/data

3)

On-site radiological concerns

4)

Need to request the site pull a reactor coolant sample for Dose Equivalent Iodine to support emergency classification 1ITIALS PRINTED NAME __________ _

.6 Radiological Assessment Manager Checklist' SRJQ/ A/2000/003 Page 2 of 5

__ Review Criteria in "Classification of Emergency" procedure for emergency classification changes and discuss with Accident Assessment perso1mel plant conditions including power failures, valve closures, etc.

NOTE:

Catawba RP/O/ A/5000/001

.QR McGuire RP/O/A/5700/000 OR Oconee RP/O/ All 0001001.

Microsoft Lyne (Skype for Business) is an acceptable communications method.

Oconee TSC Dose Assessment Liaison, 9-1-864-873-4902.

Gi Catawba/McGuire, Dose Assessment Bridge, 9-980-875-4980.

Establish communications with dose assessment personnel at TSC. Compare information. projections and strategies with TSC.

NOTE:

Descriptions of Keo wee Hydro Dam/Dike Imminent Failure/Potential Failure arc provided in.21.

___ IF Imminent Dam Failure (Keowee or Jocassee) exists, THEN make the following Protective Action Recommendations to Oconee County and Pickens County for imminent/actual dam fail me and include on the Emergency Notification Form Line 6 (Other):

Aiove residents living downstream of the Keowee Hydro Prqjel'l dams to higher ground.

Prohibit traffic.flow across bridges ident{fied on your inundation maps until the danger has passed.

.6 Radiological Assessment Manager Checklist SR/0/ A/2000/003 Page 3of5 NOTE:.2 (for CNS), Enclosure 6.3 (for MNS), and Enclosure 6.4 (for ONS) provide guidance for PA Rs and KI protective action recommendations.

. U' General Emergency is declared, THEN provide PAR information on Line 6 of the Emergency Notification Form:

CAUTION:

IF a zone has been accurately selected for evacuation, THEN it sl-iall remain selected.

o Zones for Evacuation o

Zones for Sheltering u Use of KI for General Public. {23 J o

Other PA Rs.

Determine, with input from the Accident Assessment Manager (AAM), Protective Actions using D.2, Catawba Offsite Protective Actions D

Enclosme 6.3. McGnire Offaite Protective Actions D.4. Oconee Offsite Protective Actions NOTE: IF changes to the initial Protective Action Recommendations, including KL are recommended to and approved by the EOF Director, THEN these changes shall be transmitted to the offsite agencies within 15 minutes and the reason for the Protective Action Recommendation change be reported on Line 12 of the ENF.

Review dose projections and determine if Protective Action Recommendations are required beyond l 0-mile EPZ.

Provide EOF Director Protective Action Recommendations.

.6 Radiological Assessment Manager Checklist Evaluate Emergency Release Status:

SR/0/ A/2000/003 Page 4of5 None - no release of radioactivity generated by the event and no release expected.

o ls Occurring - radioactivity generated during an event that is currently being released through any defined accident pathway, as indicated by ANY of the following:

McGuire/Catawba EMF-38, 39, 40, 51 (MNS), 53 (CNS) containment monitor reading(s) indicate an increase AND contai1m1ent pressure is greater than 0.3 psig EMF-38, 39, 40, 51 (MNS), 53 (CNS) containment monitor reading(s) indicate an increase AND a known leak path exists from containment EMF-36 unit vent monitor reading indicates an increase in activity EMF-33 CSAE exhaust monitor reading or other alternate means indicates steam generator tube leakage A known unmonitored release path exists AND radioactive material exists Alternate method of release determination Field Monitoring Team results.

Oconee RIA-47. 48. 49, 49A. 57 or 58 containment monitor reading(s) indicate an increase AND containment pressure is greater than I psig RIA-47, 48, 49, 49A. 57 or 58 containment monitor reading(s) indicate an increase AND a known leak path exists from containment RIA-45 or 46 unit vent monitor reading(s) indicate an increase in activity RIA-40 CSAE exhaust monitor reading or other alternate means indicates steam generator tube leakage

  • A known unmonitored release path exists, AND radioactive material exists Alternate method of release determination Field Monitoring Team results.

o Has Occurred - any radioactivity released lo the environment during a declared emergency event, but has been stopped.

Provide Emergency Release Status input for Linc 5 of ENF.

NOTE:.6 Radiological Assessment Manager Checklist SRJO/ A/2000/003 Page 5 of 5 Stability Class versus Delta-T charts are contained in the URI Job aid located at https :/ /n uc.duke-energy.com/si tes/RP J A/Si tcPages/I-Iome.aspx Provide on ENF Line 9:

Wind Direction (15 minute average Upper)

Wind Speed (15 minute average Upper)

Precipitation Type (Inches in last 15 minutes)

Stability Class.

NOTES: 1.

Emergency Release data are not required for initial Emergency Notification Forms QR notifications of changes in Protective Action Recommendations.

2.

It is inappropriate to provide information for liquid releases on ENF Lines 10and11. as they cannot be quantified using URI and are not the basis for Protective Action Recommendations. It is appn)priatc to provide information about liquid releases on Line

12. Remarks.

__ Provide on ENF Line I 0:

Release Characterization (Type (Ground) and Units (Ci/Sec))

Magnitude (Ci/Sec Release rates from Dose Assessment Report)

__ Provide Projection Parameters on ENF Line 11:

o Projection period ="Plume Expost,re Duration" in hours from Page 3 of URI Dose Assessment report o

Estimated Release Duration ="Release Duration" from Page 1 of URI Dose Assessment Report by adding forecast period and time elapsed since release began.

o Date and time projection was performed.

__ Provide Projected Dose information on ENF Line 11, by entering "TEDE" and " Thyroid COE" data from URI Dose Assessment report.

__ Assist Public Affairs and/or Public Spokesperson with dose comparisons based on computer model or field data.

NOTE:

IF necessary to relieve Duke Energy personnel, THE..N environmental surveillance support personnel from the DOE Radiological Assistance Plan may be requested by the Radiological Assessment Manager through the EOF Director.

__ IF needed~ THEN conduct turnover for on-coming shift.

__ Provide all completed paperwork to Emergency Preparedness upon deactivation ofEOF.

1-.7 EOF Dose Assessor Checklist INITIAL SR/0/ A/2000/003 Page 1 of 4 NOTE:

Steps in this checklist may be performed in any order appropriate to the specific event

  • conditions or they may be omitted if not applicable.

__ IF reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.

__ Don position badge.

__ Log in to PC

__ Log in to WebEOC.

__ Sign in on Sign In board.

__ Obtain copy of AD-EP-ALL-0202, Emergency Response Offsite Dose Assessment.

__ Initiate Position Log of activities sufficient to conduct a turnover for on-coming shirt.

__ Acquire necessary dose assessment and plant status infornrntion,

__ !E data acquisition programs are unavailable. THEN request SDS data from TSC or instrument readings from Control Room (EMF and Met data).

NOTE:

Be aware of the effects of loss of power on critical EMFs (Catawba and McGuire) or RIAs (Oconee).

__ Verify operability and validity of EMFs (Catawba and McGuire) or RIAs (Oconee) through the TSC.

__ IF Catawba or McGuire event is in progress, THEN verify effluent discharge aligmnent with Shift Lab, Radiation Protection Manager (TSC), or Dose Assessors (TSC) as necessary.

__ IF Oconee event is in progress, THEN verify effluent discharge alignment with TSC Dose Assessment Liaison (gas tank), RP Manager (gas tank or liquid releases). or Chemistry Manager in the OSC (liquid releases).

fNITIALS ___ _

PRINTED NAME ___________ _

. 7 EOF Dose Assessor Checklist*

NOTE:

SR/0/ N2000/003 Page 2of4 o

Microsoft Lyne (Skype for Business) is an acceptable communications method.

o Oconee, TSC Dose Assessment Liaison, 9-1-864-873-3705.

o Catawba/McGuire, Dose Assessment Bridge, 9-980-875-4980.

__ Establish communications with dose assessment personnel at TSC. Compare information, projections and strategies with TSC.

__ Obtain Dose Assessor turnover from TSC:

I. Release in progress: No: ___ _

Yes: ----

Is occurring __

Has occurred__ Time ___,,, __

Normal Operating Limits:

Below __ ___,;Above __ _

2. Recommended Protective Actions:

GS] No Recommended Protective Actions_

1i3l Evacuate ____________________ _

C Shelter-In-Place _________________ _

D Other __________________ *---

3. Additional pertinent information necessary to continue monitoring of release and dose assessment calculations.

Turnover complete date/time: ____________ _

__ Verify operability of Health Physics Network (HPN) phone by placing a call to the NRC using the number listed on HPN phone.

NOTE:

I.

Endosurc 6. 7 EOF Dose Assessor Checklist SRJO/ A/2000/003 Page 3 of 4 The NRC Regional Office will request activation of the HPN phone through Emergency Notification System (ENS) telephone if desired.

2.

Information that may be requested over the HPN line could include, but is not I imited to the following:

Is there any change to the classification of the event? If so, what is the reason?

Have toxic or radiological releases occurred or been projected (including changes in the release rate)?

If so, what are the actual or currently projected onsite and offsite releases, and what is the basis for this assessment?

What are the health effects or consequences to onsite and offsite people?

How many onsite or off site people are being or will be affected and to what extent?

Is the event under control? When was control established. or what is the planned action to bring the event under control?

What mitigative actions are currently underway or planned?

What onsitc protective measures have been taken or are planned?

What offsite protective actions are being considered or have been recommended to state and local officials?

What are the current meteorological conditions?

What are the dose and dose rate readings onsite and offsite?

l.._F_1 requested during a drill or actual event, THEN activate HPN phone by calling NRC using number listed on HPN phone.

__ Analyze source-ten11 data, formulate source-tenn mitigation strategies, and provide information to Radiological Assessment Manager, EOF Staff, and TSC Dose Assessors as required.

__ Perform dose projections as appropriate to plant conditions.

__ Interact with Field Monitoring Coordinator to compare off-site dose projections to actual field readings.

.7 EOF Dose Assessor Checklist S R/0 I A/2000/003 Page 4of4 NOTE:

Emergency Release data are not required for initial Emergency Notification Forms QR notifications of changes in Protective Action Recommendations.

_.. ___ Evaluate dose projections and provide protective action recommendations to Radiological Assessment Manager and EOF Director.

_ _...I=F.._.SAMGs are implemented AND offsite releases approach or exceed 1 OOmRem TEDE or 500mRem Thyroid COE, THEN notify EOF SAMO Evaluator (in Accident Assessment Area). (Applicable to Catawba and McGuire).

--=I.F'-" SAM Gs are implemented AND offsite releases approach or exceed 1 Rem TEDE or 5 Rem Thyroid COE, THEN notify EOF SAMO Evaluator (in Accident Assessment Area). (Applicable to Catawba and McGuire).

__..-lF._neeclccl, THEN conduct turnover for on-coming shift.

__ Restore equipment to "Ready Status" and notify appropriate personnel of conditions that would cause a less than operational status.

__ Provide nil completed paperwork to Emergency Preparedness upon deactivation of EOF.

.8 Field Monitoring Coordinator Checklist INITIAL SR/0/ A/2000/003 Page I of2 NOTE:

Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.

IF_reporting to EOF outside your normal work hours. THEN complete a Fitness for Duty Questio1rnaire.

__ Don position badge.

___ Log in to PC

__ Log in to WebEOC.

__ Sign in on Sign In board.

NCYfE;- Fie.Id ~cams_ may_l~e ?ir~~t~d by the EOF Field-M~;~*i*t*~;:;~;g Coordinat~;:*(l~Nfr.~-)--p~:f;;;:t~.. *-----1 act1vat1011 of the EOI*.

__ Obtain copy of AD-EP-ALL-0203. Protocol for the Field Monitoring Coorclinaior During Emergency Conditions.

__ Establish Position Log of activities sufficient enough to conduct a turnover for on-coming shift.

NOTE:

1.

For drill or exercise met data. choose appropriate site simulator SOS resource.

2.

For real time met data, choose the SOS resource for a specific site and unit.

__ Refer to Procedure Step 3.2 to access SOS.

INITIALS ___ _

PRINTED NAME __________ _

.8 Field Monitoring Coordinator Checklist srvO; A/20001003 Page 2 of2 WHEN EOF Radio Operator has established communications with field monitoring teams, THEN notify TSC Dose Assessors and provide direction to field monitoring teams.

Catawba Specific Perform duties as described in the following:

o HP/O/B/1009/004, "Environmental Monitoring for Emergency Conditions Within the Ten Mile Radius of CNS" o

HP/O/B/I 009/019, "Emergency Radio System Operation, Maintenance, &

Communication".

--=IF

~ needed, THEN conduct turnover for on-coming shift.

__ Restore equipment to "Ready Status" and notify appropriate personnel of conditions that would cause a less than operational status.

__ Provide all completed procedtfres and copies of logs to Emergency Preparedness upon deactivation of EOF.

INITIAL.9 Radio Operator Checklist sRJ01 A/20001003 Page I of 1 NOTE:

Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.

--=IF._reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.

__ Don position badge.

__ Log in to PC

__ Log in lo WebEOC.

__ Sign in on Sign Jn board.

__ Establish Position Log of activities sufficient to conduct turnover for on-coming shift.

__ Obtain copy of AD-EP-ALL-0203. Protocol for the Field Monitoring Coordinator During Emergency Conditions. Enclosure 5.3 (Field Monitoring Survey data Sheet) and Enclosure 5.4 (Meteorological Update for Field Monitoring Teams).

__ Establish contact with Field Teams.

__ Communicate instructions from Field Monitoring Coordinator to Field Teams.

__ Conduct turnover for on-coming shift if needed.

__ Provide all completed paperwork to Emergency Preparedness upon deactivation of EOF.

INITIALS ___ _

PRINTED NAME ___________ _

INITIAL NOTE:.10 SR/0/A/2000/003 EOF Offsite Agency Communicator Checklist Page I of2 Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.

--=IF._1 reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questio1maire.

__ Don position badge.

__ Log in to PC

__ Log in to WebEOC.

__ Sign in on Sign In board.

NOTE:

The following step is for EOF Director's Area data display.

__ Establish Emergency Notification Form display using Offsite Agency Communicator's Computer in EOF Director's Area:

D Open EN Form.

D Drag to EN Form right monitor AND maximize.

__ Establish Position Log of activities sufficient to conduct turnover for on-coming shill.

__ Notify INPO for an Ale1t, Site Area Emergency, General Emergency~ or any event expected to require significant industry support, including the name of the affected sile(s) and a name and phone number to call for additional infonnation at one of the following numbers: {IERLI-13-10}

0 9-1-800-321-0614 Ill 9-l-770-644-8091 IF_requested, TH EN:

  • ~

Provide INPO Emergency Director with a brief description of the nature of the event.

  • ' Identify any equipment or support needed from INPO.

Respond when contacted for periodic updates.

__ Perform duties as described in procedure SR/O/A/2000/004 (Notification to States and Counties from the Emergency Operations Facility).

__ Ensure emergency notification times are satisfied.

__ Conduct turnover for on-coming shift, if needed.

.10 SR/0/ A/2000/003 EOF Offsitc Agency Communicator Checklist Page 2 of2

__ Provide all completed paperwork to Emergency Preparedness upon deactivation ofEOF.

INITIALS ___ _

PRINTED NAME _______ _

.l 1 EOF Services Administration/Commissary Checklist SRJO/ A/2000/003 Page 1 of 2 NOTE: Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.

INITIAL

__ IE.reporting to EOF outside your normal work hours, THE['S complete a Fitness for Duty Questionnaire.

__ Don position badge.

__ Log in to PC

__ Log in to WebEOC.

__ Sign in on Sign In board.

__ Establish Position Log of activities sufficient to conduct turnover for on-coming shift.

__ Ensure that the EOF Services Area is set up.

__ Provide administrative office support and supplies. such as:

o Ortice supplies and equipment o

Sccrdarial/clerical services o

Copy center/fax services J

~------------------**--------------------~

NOTE: Personnel without badge access will need to be escorted into the EOF by the Assistant EOF Director, EOF Emergency Planner. EOF Services Manager, or their Mentor. [61]

_. __.Provide for personal needs of ERO, such as:

o Food and beverage Air travel, hotel, and car rental arrangements o

Tables and chairs o

Tents

~*. Portable toilets o

Trash receptacles

__ IF requested, THEN provide in-house craft resources.

__ IE.needed_, THEN contact additional personnel for support.

__ Provide all completed paperwork to Emergency Preparedness upon deactivation ofEOF.

INTTIALS _____ PRINTED NAME ___________ _

.11 EOF Services Administration/Commissary Checklist EOF FACILITY POST-EVENT CHECKLIST Secure the EOF Services Area.

__ Restock office supplies.

__ l!: needed. THEN:

Ensure return ofrelocated office equipment.

Notify hotels/motels of release of rooms.

Qt*

Assist personnel needing transportation home.

SR/0/ A/2000/003 Page 2 of2

e.

Notify vendors to pick up furniture and equipment not needed for recovery.

__ Notify vendors to discontinue food services to EOF.

ACTION UST FOR CHANGING FROM EMERGENCY TO RECOVERY MODE

__ Replenish supplies.

__ Determine additional space requirements.

__ Prepare weekly work schedules.

__ Detennine hotel/motel accommodations and travel requirements and contact Trnvel Services for securing these requirements.

__ Notify food vendors to arrange shift operations to support recovery efforts for meals and breaks (snacks) with times and locations for serving.

__ Notity chairs and table suppliers for appropriate needs and quantities.

__ Notify tent suppliers for appropriate needs and quantities.

__ Notify portable toilet suppliers for appropriate needs and quantities.

__ Notify trash receptacle suppliers for appropriate needs and quantities.

__ Establish shift coverage of commissary personnel to suppo1t total recovery efforts.

.12 Accident Assessment Manager Checklist INITIAL SR/0/ A/2000/003 Pagel of 4 NOTE:

Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.

__ _.I.... F.._reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.

__ Don position badge.

__ Log in to PC

__ Log in to WebEOC.

__ Sign in on Sign In board.

__ Establish Position Log of activities sufficient to conduct turnover for on:-coming shill.

NOTE:

The following step is needed for EOF Director's Arca data display.

__ Establish SOS data display.

D Refer to Step 3.2 in procedure body to access SOS for affected site and unit.

D Drng SOS display to right monitor AND maximize.

__ Obtain copy of applicable "Classification of Emergency" procedure to provide analysis and advice regarding emergency classifications.

o Catawba: RP/O/A/5000/001 o

McGuire: RP/O/A/5700/000 o

Oconee: RP/O/A/1000/001

__ _,IF,_Oconee is affected, IHEN obtain copy of "Oconee Nuclear Site Emergency Action Level Description Guidelines" Manual.

__ Ensure PC is on and displaying plant status.

__ Post changes in Fission Product Barrier status on Fission Product Barrier Status Board..

__ Provide EAL number and description and declaration time for ENF Line 4 to Offsite Agency Communicators.

__ Assist the Radiological Assessment Manager (RAM) in determining Protective Actions using:

D.2. Catawba Offsite Protective Actions D.3, McGuire Offsite Protective Actions D.4~ Oconee Offsite Protective Actions

.12 Accident Assessment Manager Checklist SR/0/ A/2000/003 Page 2 of 4

.... --.Provide Prognosis for ENF Line 7 to Offsite Agency Communicators. {I}

INITIALS PRINTED NAME-----------

NOTE:.12 Accident Assessment Manager Checklist s RJO I A/20001003 Page 3 of 4 The Affected Unit on Line 8 is tied to the EAL on Line 4. Examples may not be all inclusive of events that may affoct all units.

Provide Affected Unit(s) for ENF Line 8 to Offsite Agency Communicators:

Evaluate the following for classification for both units (CNS and MNS) or all three units (ONS).

o Security event o Seismic event o Tornado on site o Hurricane force winds on site o Loss of both switch yards o Fire in SSF o Fire affecting shared safely related equipment c Imminent Failure for Kcowee Hydro Project Dam/Dike (ONS).

o IF event only affects one (I) unit QR.one unit has a higher classification, THEN check appropriate unit.

Provide Unit Status for ENF Line 8 to Offaite Agency Communicators.

I.E.an upgrade in classification occurs, THEN notify Offsite Agency Communicator.

Coordinate the following functions:

Accident Assessment Interface Operations Interface o

Reactor Physics (as needed)

.12 Accident Assessment Manager Checklist SR/0/ A/2000/003 Page 4of4

__ Prepare for EOF Briefings using Enclosure 6.23 (EOF Briefing Guideline).

__ Assist TSC Emergency Coordinator as requested upon entry into Severe Accident Management Guidelines (SAMGs).

__ Conduct turnover for on-coming shift, if needed.

__ Provide all completed paperwork to Emergency Preparedness upon deactivation of EOF.

.13 Accident Assessment Interface Checklist INITIAL SR/0! A/20001003 Page I of 5 NOTE:

Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.

--=IF;...* reporting to EOF outside your normal work hours. THEN complete a Fitness for Duty Questionnaire.

__ Don position badge.

____ Log in to PC

__ Log in to WebEOC.

__ Sign in on Sign In board.

__ Notify Accident Assessment Manager that posit.ion is staffed.

__ Establish Position Log of activities sufficient enough to conduct turnover for on-coming shift.

__ Ensure PCs are on and displaying affected station and unit plant status.

NOTE: Communications are established after the beep.

__ Establish bridge line for Operations Loop for affected station:

D Catawba: 9-803-701-3994 D

McGuire: 9-980-875-4500 D

Oconee: 9-1-864-873-4908

--=IF;...needed for McGuire, THEN establish communications link with Engineering Manager.

9-980-875-4954.

.... IF._Oconee event, THEN establish communications with Operations Interface, 9-1-864-873-3696.

__ Obtain copy of Classification of Emergency procedure for affected station.

D Catawba: RP/O/A/5000/001 D

McGuire: RP/0/ A/5700/000 D

Oconee: RP/O/A/1000/001 INITIALS ___ _

PRINTED NAME ___________ _

.13

  • Accident Assessment Interface Checklist SR/0/ A/2000/003 Page 2of5
  • -- Obtain copy of Core Damage Assessment procedure for affected station.

D Catawba: RP/O/A/5000/015 0

McGuire: RP/O/ A/5700/019 D

Oconee: RP/0/B/10001018.

__ Gather plant status infonnation using Accident Assessment Initial Information Request Form on page 4 or 5 of this enclosure.

__ IF AT ANY TIME General Emergency is declared, THEN RECOMMEND IM MEDIATELY to Accident Assessment Manager AND RAM protective actions using:

o Enclosure 6.2 - Catawba Offsite Protective Actions o Enclosure 6.3 - McGuire Offsite Protective Actions o Enclosure 6.4 - Oconee Offsite Protective Actions

__ Perform the following steps as needed throughout event:

__ IE.condition warrants, THEN determine analysis of reactor core and containment conditions in regard lo:

o Core sub-cooling o

Decay heat generation o

Heat removal capabilities (core and containment) o Fission product release potential (core and containment).

IE.condition warrants. THEN provide:

~

Estimates of core uncovery times Interpretations of reactor water level data.

Monitor status of Emergency Operations Procedures (EOPs) and discuss with Accident Assessment Manager.

Confer with Radiological Assessment group in EOF.

Consult with Operations Interface on anticipated course of events.

__ Confer with Accident Assessment Manager on the following:

Anticipated course of events 111.

Diagnosis of the accident and mitigation strategies o

Analysis of core and containment Core damage and fission product release potential 111 Background information of system design Emergency classifications.

.13 Accident Assessment Interface Checklist sRJO! N2000I003 Page 3of5

__ Support Engineering Manager in TSC in accident and mitigation strategies.

__ Assist TSC as an evaluator upon entry into Severe Accident Management Guidelines (SAMG) (as requested).

--=JF;...i' SAM Gs are entered, THEN update SAMG status board.

......,IF.... McGuire has entered SAMG, THEN REFER TO Enclosure 6.19 (Establishing Communications Links between McGuire SAMG Evaluators).

__ Conduct turnover for on-coming shift, if needed.

__ Provide all completed paperwork to Emergency Preparedness upon deactivation of EOF.

.13 Accident Assessment Interface Checklist SR/0/ A/2000/003 Page 4of5 Catawba or McGuire Initial Information Re<1uest Initial Information Rcouest Results Emergency Classification Status EAL Declaration Chronology Protective Actions Status Reactor/Turbine Status Power Level Time of Trip & On What Signal Any Abnormal Response NC Pump Status Core Cooling Status (subcooled margin/

RVLIS/natural circulation)

Orange or Red CSFs Alarms Received Safety Injection When Actuated & on What Signal NV, NI, ND, Ice Condenser Status Fcedwatcr CF and CA Status Main Steam Isolation Status SMSV. SM PORV, SB Status Electric Power 600V, 4 J 60V, D/G Status Containment Isolation Status NS and VX Status Security/Fire/Flooding/HAZMAT/Other Hazards Plant Conditions Status Off-site Releases Status

.13 Accident Assessment Interface Checklist Oconee Initial Information Request Initial Information Rcauest Emergency Classification Status EAL Declaration Chronology Protective Actions Status Reactor/Turbine Status Power Level Time of Trip & On What Signal Any Abnormal Response Reactor Coolant Pump Status Core Cooling Status (subcooled margin/

RVLIS/nalural circulation)

Safety Inicction When Actuated & on What Sigmil_

HPI. LPI Status Fcedwater Fecdwater and Emergency Feedwater Status Main Steam Isolation Status MSSV Status Electric Power 600V, 4 l 60V. Keo wee, Lee Status Containment Isolation Status

  • RBS, RBCU Status Sccurity/Firc/Floodin2/HAZMA T /Other Hazards Plant Conditions Status (Keowee Hydro Dam status)

Off-site Releases Status SR/0/ A/2000/003 Page 5of5 Results i'

.14 Operations Interface Checklist INITIAL NOTE:

This enclosure does not apply to Oconee.

SR/0/ N2000/003 Page 1 of 1 NOTE:

Sleps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.

__ !E..reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.

_______ Don position badge.

__ Log in to PC

__ Log in to WebEOC.

__ Sign in on Sign In board.

__ Establish Position Log or activities sufficient to conduct turnover for on-coming shift.

__ Perform following steps. as needed. throughout event:

__ Provide communications interface between Accident Assessment Group and TSC Operations Group.

__ Advise Accident Assessment Group on the following:

e Emergency Operations Procedures (EOPs) u Diagnosis of accident and mitigation strategies 0

Emergency classification.

__ Advise TSC of anticipated course of events.

__ Conduct turnover for on-coming shift. if needed.

__ Provide all completed paperwork to Emergency Preparedness upon deactivation ofEOF.

INITIALS ___ _

INITIAL NOTE:.15 Emergency Planner Checklist s1v01 A120001003 Page I of 14 Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.

__ IE.reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.

__ Don position badge.

__ Log in to PC

__ Log in to WebEOC.

__ Set up WebEOC content for display.

D Click on Sign In board.

D Drag Sign In board to right monitor AND maximize.

D Click Offsitc Notifications.

D Drag Offsite Noli fications to the Jell screen AND maximize

__ Sign in on Sign In board.

__ Establish Position Log of activities sufficient to conduct turnovci* for on-coming shill.

__ (MNS and CNS only) Obtain Emergency Planner wireless phone and headset from Emergency Planner Desk area and access EP bridge line, 9-803-701-4010.

NOTE:

Secure EOF videoconferencing door by locking to the exterior hallway from the inside. Return to the EOF using the EOF hallway door Have on hand all emergency notification forms (ENFs) transmitted to state and local agencies up to this time. Be prepared to answer questions concerning infonnation on the ENFs as well as any other information requested by ECOC Director when called back.

__ Contact the Enterprise Crisis Operations Center (ECOC) Director by email at ECOCDirectors@duke-energy.com il.B..by phoning the Enterprise Security Console at 2-8851 or 9-1-800-943-7584, ask them to contact the ECOC Director about the EOF activation, and provide your call back number. ( IER L 1-13-10} { 77]

NOTE:

Personnel \\vithout badge access will need to be escorted into the EOF by the Assistant EOF Director.

EOF Emergency Planner, EOF Services Manager, or their Mentor. [61]

__ Support EOF Director with the following:

Document Onsite Protective Measures in WebEOC.

.15 Emergency Planner Checklist SR/0/ A/2000/003 Page 2of14 Provide escorted access to EOF for personnel without badge access. [61]

Document names of personnel escorted in EOF Facility log.

__ Complete EOF Director Checklist items as requested.

__ Clarify Emergency Plan and Emergency Plan Implementing Procedure information.

__ Interface with federal, state and local agencies.

___ Assist Off-Site Agency Communicators in preparation of emergency notifications.

INITIALS ___ _

PRINTED NAME-------------

.15 Emergency Planner Checklist SR/0/ A/2000/003 Page 3of14 IF_a security event at MNS requires assembling MNS TSC/OSC ERO at EOF, THEN complete "MNS Security Event. TSC/OSC Assembled at EOF Checklist," page 12 of 14 of this enclosure.

.;;;.;IF:...a Beyond Design Basis External Event (BDBEE) or Extended Loss of Offsite AC Power (ELAP) event at MNS requires assembling TSC/OSC ERO al the EOF, THEN complete "MNS BDBEE/ELAP, TSC/OSC Assembled at EOF Checklist," page 12of14 of this enclosure. {76}

--=IF_a security event at CNS requires assembling the duty CNS TSC ERO at the EOF, THEN complete "CNS Security Event. TSC ERO Assembled at EOF Checklist," page 13of14 of this enclosure.

NOTE: I. EOF Duty Roster is available on DAE using Nuclear Generation Duty Roster application. EOF information is under General Office location.

2. Consider hours previously worked prior to ERO activation in determining shill turnover schedules for 24-hour staffing.

___ Complete 24-1-Iour Staffing Log for each EOF position. pages 5 through I 0 of this enclosure.

__ Close oul WcbEOC Sign In Board

__ Ensure lhat 24-hour staffing plans are established and maintained for all EOF positions for the duration of the entire emergency. : !ERL 1-13-1 OJ

__ !E.EPZ roadblocks have been established. THEN prepare for emergency worker re-entry using page 14 of this enclosure.

__ Verify Public Affairs personnel have considered 24-hour staffing by calling the JIC Admin.

Manager at 2-0548.

__ Record EOF Exercise/Drill/Event Duke Energy employee participation as follows:

D IF scheduled drill, THEN activate eRoster program and scan OR enter Duke Energy employee ID number and Submit E-roster at the conclusion of the drill.

D IE..not a scheduled drill.QR.scanner-inoperable, THEN request participants sign Exercise/Drill/Event/Training Attendance Sheet. [61]

.15 Emergency Planner Checklist SR/0/ A/2000/003 Page 4of14

___ Request Duke Energy participants sign Drill and Event Participation Roster (AD-EP-ALL-0802.

Conducting Drills and Exercises, Attachment 4, Drill and Event Participation Roster). [61]

__ Conduct turnover for on-corning shift, if needed.

__ Upon deaclivation of the EOF~ fo1ward a copy of the Drill and Event Participation Roster (AD-EP-ALL-0802, Conducting Drills and Exercises, Attachment 4~ Drill and Event Participation Roster) to each DEC site's Emergency Preparedness Manager.

__ Upon deactivation of EOF. collect all completed paperwork and forward to appropriate Emergency Preparedness Manager.

__ Upon deactivation of EOF. complete "EOF Post Event Checklist," page 11 of this enclosure.

Position EOF Director Assistant EOF Director EOF Log Recorder EOF Emergency Planner Radiological Assessment Manager Accident Assessment Manager.15 Emergency Planner Checklist EOF DIRECTOR AREA 24-HOUR POSITION EOF STAFFING LOG Primary Name

  • Shift Name Schedule List hours of coverage: i.e., 0800-2000, or Sam -8pm.

SR/0/A/2000/003 Page 5of14 Relief

  • Shift Schedule

Position EOF Dose Assessor EOF Dose Assessor EOF Dose Assessor EOF Dose Assessor (HPN)

Field Monitoring Coordinator Radio Operator.15 Emergency Planner Checklist DOSE ASSESSMENT AREA sRJO/ N2000I003 Page 6of14 24-HOUR POSITION EOF STAFFING LOG Primary Relief Name

  • Shift Name
  • Shift Schedule Schedule List hours of coverage: i.e., 0800-2000, or 8am -8pm.

Position.

Accident Assessment Interface Operations Interface (MNS and CNS only).15 Emergency Planner Checklist ACCrnENT ASSESSMENT AREA SR/0/ A/2000/003 Page 7of14 24-HOUR POSITION EOF STAFFING LOG Primary Relief Name

  • Shift Name 1'Shift Schedule Schedule
  • List hours of coverage: i.e., 0800-2000, or Sam -8pm.

-~*~

Position Lead EOF Off-Site Agency Communicator EOF Off-Site Agency Communicator EOF Off-Site Agency Comn1unicator.15 Emergency Planner Checklist OFFSJTEAGENCY COMMUNICATOR 24-HOUR POSITION EOF STAFFING LOG SR/0/ A/2000/003 Page 8of14 Primary Relief

  • Name
  • Shift Name
  • Shift.

Schedule Schedule

'~'

List hours of coverage: i.e.. 0800-2000, or 8nm -8pm.

,,,,,,.,,,,,..,,.,.,.,,.m, Position EOF Services Manager EOF Services Adn1in/Commissary EOF Data Coordinator.15 Emergency Plnnner Checklist EOF SERVICES AREA SR/0/ A/2000/003 Page 9of14 24-HOUR POSITION EOF STAFFING LOG Primar /

Relief Name

  • Shift Name
  • ~shift Schedule Schedule List hours of coverage: i.e., 0800-2000, or 8am -8pm.

.15 SR/0/fV2000/003 Emergency Planner Checklist Page I 0 of 14


.----------------------~

Name (Please Print)

Representing Agency

~---------------------~-------- ------


**~-*--

.15 Emergency Planner Checklist EOF FACILITY POST EVENT CHECKLIST SR/0/ A/2000/003 Page 11 of 14

.--.Obtain copy ofTSC/EOF Log Printout.

NOTE:

Retrieve:

o Completed Procedures e

Notes D

Log Sheets

.. ~Turn off video wall board using Supervisor XPanel (System power-Off).

EOF Services completes Enclosures 13.4 and 13.5 from procedure ST/O/ N4600/086.

Complete applicable enclosures of ST/O/ A/4600/086 to replenish procedure inventories Clean tables off Put all trash in containers Erase status boards Verify all multifunction machines have paper supply replenished Verify cordless phones are lell in cradles to be charged.

Replenish Position Specific Notebooks (I copy of procedure body and minimum 3 copies or applicable enclosures, checklists and log sheets):

EOF Director (also include minimum 3 copies each or Enclosure 6.2, 6.3 and 6.4)

Radiological Assessment Manager (also include minimum 3 copies each of Enclosures 6.2, 6.3, and 6.4).

EOF Dose Assessor Field Monitoring Coordinator Radio Operator EOF Offsite Agency Communicator (also include I copy of EP FAl'vl 3.15 Attachment 3.15.3.3)

Accident Assessment Manager (also include minimum 3 copies each of Enclosures 6.2, 6.3, and 6.4).

Accident Assessment Interface EOF Operations Interface EOF Emergency Planner EOF Log Recorder (also include 1 copy of EP FAM 3.1 S Attachment 3.15.3.2)

EOF Data Coordinator EOF Services Manager

.15 Emergency Planner Checklist sRJ01 A/20001003 Page 12of14 MNS SECURITY EVENT, TSC/OSC ASSEMBLED AT EOF CHECKLIST

__ Notify Energy Center Building Security, 2-t 234, that TSC/OSC offsite responders are assembling at EOF. [61]

__ Request that TSC/OSC responders assemble in EOF videoconferencing room.

__ Coordinate selection of first response team that will activate TSC/OSC when Security Event is terminated.

__ Move first response team into EOF work area to obtain plant status and recovery strategies.

..... IF

~ needed, THEN obtain copies ofRP/O/A/5700/012, Activation of the Technical Support Center, (TSC) and RP/O/A/5700/020. Activation of the Operations Support Center (OSC), from the McGuire procedure cabinet.

__ Determine 24-hour stalling for each TSC/OSC position.

IF.._EOF videoconferencing room is too crowded. THEN determine whether lo send TSC/OSC reliel'members to Energy Center Cafeteria.

WHEN Security Event is terminated and onsite TSC/OSC is to be activated. THEN ensure that first response team to TSC/OSC is briefed prior to dispatch to site.

__ Send relief TSC/OSC members home. if possible. with their assigned relief time.

MNS BDBEE/ELAP EVENT, TSC/OSC ASSEMBLED AT EOF CHECKLIST {76}

__ Notify Energy Center Building Security at 2-1234 that TSC/OSC offsite responders are assembling at EOF.

__ Request that TSC/OSC responders assemble in EOF videoconferencing room.

__ Assist TSC Emergency Planner in establishing priorities for transp011 of MNS ERO personnel to the site.

__ Assist TSC Emergency Planner in determining 24-hour staffing for each TSC/OSC and alternate TSC/OSC position.

--=IF

.... needed, THEN obtain copies ofRP/O/A/5700/012, Activation of the Technical Support Center. (TSC) and RP/O/A/5700/020, Activation of the Operations Suppot1 Center (OSC), from the McGuire procedure cabinet.

--=IF

..... EOF videoconferencing room is too crowded, THEN detennine whether to send TSC/OSC relief members to Energy Center Cafeteria.


~.15 Emergency Planner Checklist SR/0/ N2000/003 Page 13of14 CNS SECURITY EVENT, TSC ERO ASSEMBLED AT EOF CHECKLIST

__ Notify Energy Center Building Security, 2-1234. that CNS TSC duty responders are assembling atEOF. [61]

__ Have CNS TSC responders assemble in EOF videoconferencing room.

__ Obtain RP/O/A/5000/020 Enclosure 4.20 from CNS procedure cabinet and distribute to assembled TSC ERO.

--=IF._CNS TSC Emergency Planner does not respond within 75 minutes of declaration, THEN assist Assistant TSC Emergency Coordinator with assigned tasks.

WHEN decision is made to access Catawba and staff the TSC and OSC, THEN ensure choice of facility (normal or alternate) TSC and OSC is known prior to TSC staff departure.

.15 Emergency Planner Checklist SRJ01N2000/003 Page 14of14 EMERGENCY WORKERJSPECIAL EQUIPMENT RE-ENTRY AFTER ROAD BLOCKS ARE ESTABLISHED IN THE EPZ t

OTE: TSC E;~~~~*gen~y Pl~1~1~~~~s to work wi~l~-RP-to deter~~ine if off ~oin~ si1i ft,~jj i-1~~ed to

.ive their personnel vehicles onsite and leave in the relief bus.


~- -----***-

1.1

!E..roadblocks are in place in l 0 mile EPZ AND affected site's Emergency Planner has asked the EOF to prepare for emergency worker re-entry for on site relieC THEN perform the following:

l.2 Request EOF Services Manager obtain bus( es) to be used for re-entry of relief workers.

1.3 Coordinate with TSC Emergency Planner lo verify re-entry path to be used, working with Field Monitoring Coordinator and Radiological Assessment Manager to ensure the path selected avoids the plume foot print.

1.4 Coordinate with State representative at EOF to contact re-entry county EOC to obtain Highway Patrol escorts for bus.

l.5 Ensure State representative requests counly EOC to notify roadblock selected for re-entry with Estimated Time of Arrival for the bus( cs) with Highway Patrol escort.

2.0

!E.roadblocks are NOT established. THRN info1111 TSC Emergency Planner access will be normal.

3.1 IE.roadblocks are in place when special equipment is to be brought to plant. THEN use process in step 1.0 for equipment to pass through roadblock.

.16 EOF Log Recorder Checklist SR/0/ A/2000/003 Page 1 of 5 NOTE:

Steps in this checklist may be perfonned in any order appropriate to the specific event conditions or they may be omitted if not applicable.

INITIAL NOTE:

!.E.reporting to EOF outside yom normal work hours, THEN complete a Fitness for Duty Questionnaire.

Don position badge Log in to PC Start Up main video wall D Double-click Supervisor XPanel on desktop D Click Duke Energy Logo D Click System Power D Click Power On D Click Wall Presets D Click Center Prest:!! I Log in to WebEOC Sign in on Sign In board Refer to EP FAM Section 3.15. Attachment 3.15.3.2, for WebEOC Logging instructions.

Set up WebEOC content for display.

0 Click on SITE PAR EPZ and open the file 0 Drag SITE PAR EPZ to right monitor AND maximize.

o Under Slide Show tab~ Click dropdown beside "Show On" and select "Monitor I Generic PnP Monitor" o Select "From Begiiming" to place document in slideshow view D Click Significant Events Log.

o Drag significant Events Log to the left monitor and maximize oThis is a template for initial set up of the video knowledge wall.

  • Views may be changed at the EOF Director's discretion.
  • Remove EOF Sign-in after foll staffing is met.

Site l (Main Video Wall):

.16 EOF Log Recorder Checklist sos NF Significant Events Log Fission Product E

Barrier Matrix Sign In Board SRJO! A/2000/003 Page 2of5 PARs Off site Notification Status Make licker for Classification 0

Log in to Sidebar 0 Click on Perspectives D Double-Click Centcr_Preset_l (Enlarge as necessary but do NQI.maximize)

D Go back to Sidebar and Click on Decorators 0

Drng appropriate Site and Classification lo Significant Events Log screen on the Center Preset I window Make ticker for Next Time Out 0

Log in to Sidebar D Click on Perspectives 0

Double-Click Center_Preset_l (Enlarge as necessary but do NO.I.maximize)

D Click on Decorators D Drag Next Time Out to Significant Events Log screen on Center_Preset_I window (screen will show large gap between tickers; do N.QI..close gap)

D Right-Click Next Time Out and select Properties D Click on Text tab in Properties D Highlight time (time only)and enter time for Next Time Out D Click Apply D Click OK IE.classification changes, THEN update tickers for Classification and Next Time Out D Right-Click Site and Classification ticker on Center_Preset_l screen and delete ticker D Drag new Site and Classification to Significant Events Log screen on the Center_Preset_l window Update ticker for Next Time Out as requested by EOF Director D Right-Click Next Time Out and select Properties D Click on Text tab in Properties D Highlight time (time only)and enter time for Next Time Out D Click Apply D ClickOK

.16 EOF Log Recorder Checklist SR/0/ A/2000/003 Page 3of5 NOTE:

These steps would be performed by additional Log Recorders for Site 2 or Site 3.

IE.needed, THEN set up display for Site 2 or Site 3 D Log in to PC D Click Supervisor XPanel on desktop D Click Duke Energy Logo D Click System Power D Click Power On D Click Wall Presets D Click Right Preset I (Site 2) OR Lefi Preset I (Site 3) sos ENF Significant Events Log Log in to WebEOC Sign in on Sign In board Refer to EP FAM Section 3.15, Attachment 3.15.3.2, for WebEOC Logging instructions.

Set up WebEOC content for display.

D Click Significant Events Log D Drag to right screen and maximize Make ticker for Classification D Log in to Sidebar D Click Perspectives D Double-Click Right_Preset_l (Site 2) OR Left_Preset_l (Site 3) (Enlarge as necessary but do NOT maximize)

D Go back to Sidebar and Click on Decorators D Drag appropriate Site and Classification to EN Form screen on the Right_Preset_l (Site 2)

QB..Left_Preset_l (Site 3) window Make ticker for Next Time Out D Log in to Sidebar D Click on Perspectives D Double-Click Right_Preset_l (Site 2) OR Left_Preset_I (Site 3) (Enlarge as necessary but do NOT maximize)

D Click on Decorators D Drag Next Time Out to EN Form screen on Right_Preset_l (Site 2).QR.Left_Preset_l (Site

3) window (screen will show large gap between tickers; do N.QI.close gap)

--***.16 EOF Log Recorder Checklist D Right-Click Next Time Out and select Properties 0 Click on Texl tab in Properties D Highlight time (time only) and enter time for Next Time Out D Click Apply D Click OK SR/0/A/2000/003 Page 4 of 5

!E.classification changes, THEN update tickers for Classification and Next Time Out D Right-Click Site and Classification ticker on Right_Preset_I (Site 2) OR Left_Preset_I (Site 3) screen and delete ticker D Drag new Site and Classification to Significant Events Log screen on the Right_Prese!_I (Site 2) OR Left_Preset_l (Site 3)window Update ticker for Next Time Out as requested by EOF Director D Right-Click Next Time Out and select Properties D Click on Text tab in Properties D Highlight time (time only) and enter time for Next Time Out 0 Click Apply D Click OK INITIALS ___ _

NOTE:

l. Incorrect log entries may be corrected by making the needed correction for the specific entry and flagging it as a "corrected item".
2. The EOF Log Recorder should enter EOF specific information and other information as directed by the EOF Director or Assistant EOF Director.
3. Log activities must be detailed enough to "tell the story" if necessary to reconstruct events for the NRC and to have an effective turnover to EOF staff.

__ Establish official log of all significant EOF activities and EOF Director decisions using WebEOC computer program sufficient to conduct turnover for the on-coming shift. { IER 13-10 Rec. 11.a}

__ Log entries should include, but are not limited to, the following examples:

- EOF Director and any change in EOF Director (staffing)

- Time of EOF activation

- Emergency classification, changes in classification. time of declaration

- Protective Action Recommendations

- Approval/transmittal of Emergency Notification Forms

- Approval/distribution of News Releases

- Plant Conditions (Unit l. 2. and 3):

.16 Ji30F' Log Recorder Checklist

- Core Cooling information (i.e., Time To Boiling, etc.)

- Safety Systems Degraded

- Power Supply Status

- Fission Product Barrier Degradation

- Radiation Releases

- Procedures in effect and any transition to another procedure

- Actions taken that are not part of an approved procedure

- Any abnormal or unexpected plant response

- Major equipment manipulations

- Major mitigation actions taken

- Site assembly, relocation, or evacuation of all or any part of the plant

- Personnel Injuries

- Facility priorities

- Recovery Action(s) in Progress

- Summary offocilities briefings

- Expected time of next Time-Out SRJ0/ A/2000/003 Page 5 of 5

- Any parameter that shows how drill/event is managed (ex. releases~ time, communication)

IE. WcbEOC computer program is not available, THEN establish manual log of all significant EOF e1ctivities and EOF Director decisions.

__ !E..requested by EOF Director. THEN prepare sequence of events list and revise it as necessary.

__ Maintain EOF Director's Area displays and status bomds as directed or needed.

__ Record established priorities on EOF status board as requested by EOF Director.

__ Conduct tumover for on-coming shift, if needed.

Remove ticker for classification/next time-out.

D Log in to Side Bar D Click on Perspectives 0

Double-Click Center_Preset_

0 Right click the classification and click delete 0

Right click the Next Time Out and click delete Shut Down main video wall D Double-click Supervisor XPanel on desktop 0 Click Duke Energy Logo D Click System Power 0 Click Power Off

__ Print copy of Incident Event Log.

__ Provide all completed paperwork to Emergency Preparedness upon deactivation ofEOF.

.17 EOF Data Coordinator Checklist SR/0/ A/2000/003 Page 1 of I NOTE:

Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted if not applicable.

INITIAL IF reporting to EOF outside your normal work hours, THEN complete a Fitness for Duty Questionnaire.

__ Don position badge.

__ Log in to PC

__ Log in to WebEOC.

__ Sign in on Sign In board.

__ Establish Position Log of activities sufficient to conduct turnover for on-coming shift.

Verify EOF computer hardware, soil ware. and data display equipment is operational per EP FAM 3.8. EOF Data Coordinator's Reference Manual.

___ Provide computer support as required:

Software and hardware applications support o

Data acquisition supp011 o

Communication with TSC Data Coordinator

__ *Conduct turnover for on-coming shift~ if needed.

__ Provide all completed paperwork to Emergency Preparedness upon deactivation of EOF.

INITIALS ___ _

PRINTED NAME ____________ _

.18 EOF Services Manager Checklist SR/0/ A/2000/003 Page I of 3 NOTE:

Steps in this checklist may be performed in any order appropriate to the specific event conditions or they may be omitted ifnot applicable.

INITIAL

__ IE.reporting to EOF outside your normal work 1-iours, THEN complete a Fitness for Duty Questionnaire.

__ Don position badge.

__ Log in to PC.

__ Log in to WebEOC.

Sign in on Sign In bonrd.

Establish Position Log of activities sufficient to conduct turnover for on-coming shift.

-. ____ Obtain contact information for Global Risk Management and Insurance duty person to provide to American Nuclear Insurers (ANI).

___ Obtain copy of most recent Emergency Notification Form.

Notify ANI at 9-1-877-680-2644 within 120 minutes of an /\\lerl or higher event declaration and provide answl!rs to Lhe following:

o What is your name (please spell your last name)?

o What is the telephone number for immediate callback?

11 What is the name of your facility?

What is the name of your organization?

o What is the date and time of the event?

o What is the extent of damage?

o Briefly describe the nature of the event that you are rep01ting.

D Please provide contact person information (including the contact person's direct telephone nmnber(s) and their position within the organization) for ANI follow-up.

__ Document ANI notification in Position Log, including time and summary of information provided.

INITIALS ___ _

PRINTED NAME __________

.18.

EO!i' Services Manager Checklist SRIOI AJ2000/003 Page 2 of3

--* Activate the EOF Services Function by establishing duty function contacts for EOF service areas and post in EOF Service area:

~

Administration/Commissary [SR/O/A/2000/003, Enclosure 6.11, EOF Services Administration/Commissary Checklist]

o Communications (24-hour number is 2-1961) [AD-EP-ALL-0107, Emergency Operations Facility (EOF) Services, Section 4.1 and Step 5.1]

Transportation Services [AD-EP-ALL-Ol 07, Emergency Operations Facility (EOF)

Services, Section 4.2 and Step 5.2]

Global Risk Management and Insurance [ AD-EP-ALL-0 l 07, Emergency Operations Facility (EOF) Services, Section 4.3]

Procurement [AD-EP-ALL-0107, Emergency Operations Facility (EOF) Services, Section 4.4 and Step 5.3]

-*-- Provide general administrative support and office supplies.

__ Ensure office equipment is functioning properly.

NOTE:

Personnel without badge access will need to be escorted into the EOF by the Assistant EOF Director. EOF Emergency Planner, EOF Services Manager, or their Mentor. [61)

__ !f..neecled. THEN provide escorted access to EOF l'or personnel without badge access. and document names of personnel escorted in log.

--*- Provide food and beverages to meet nutritional needs.

__ Provide facilities to meet personal needs (dining facilities. toilets, trash receptacles and disposal) as required.

NOTE:

I.

The INPO phone number may be obtained from the Consolidated Emergency Phone Directory for the Emergency Operations Facility (EOF).

2.

The INPO Emergency Resources Manual provides a list of contacts at each US conunercial nuclear power site, and an emergency equipment list. The INPO Emergency Resources Manual can be found on the INPO Website or the bookcase in the EOF Director's Area.

!E..needed, THEN perform the following:

Request Communications to troubleshoot and repair telephone systems, mobile radios and cell phones.

a Request Transportation Services or others arrange for necessary equipment for movement of materials and perso1mel.

o Request Transportation Services or others to a1Tange necessary equipment and perso1mel for debris removal in order to access the DEC nuclear sites. { IER L l-11-14}

Obtain accommodations for personnel.

.18 EOF Services Manager Checklist SR/0/ A/2000/003 Page 3of3 Request Global Risk Management and Insurance serve as liaison between Duke Energy and insurance companies in gathering data and establishing claims offices to disburse emergency assistance funds to evacuees.

Request Procurement coordinate all activities related to the purchase of materials, equipment and services from outside supplies including arranging for transportation and receiving as required.

o Contact INPO for additional resources (human resources, emergency equipment, technical expertise). {75] {IER Ll-13-10}

ci IE.a Beyond Design Basis External Event (BDBEE)/Extended Loss of Off.site AC Power (ELAP) event al MNS, THEN request Transportation Services implement the MNS BDBEE/ELAP ERO Transportation Plan insert to the Fleet Storm EOF Manual. {76 j

__ !E..24-hour staffing is required, THEN perfo1111 the following:

o Notify additional personnel and arrange schedule for continuous support.

o Conduct turnover for on-coming shift.

___ Ensure that all trash and left over food products are properly contained and arrange for disposal.

Notify Facility Services to clean the EOF following deactivation.

Obtain Procedure ST/O/ A/4600/086. Standard Procedure for Periodic V crification of Communication Equipment Operation and Equipment/Supply Inventory. Enclosures 13.4 and 13.5 and complete checklists.

Provide all completed paperwork to Emergency Preparedness upon deactivation ofEOF.

__ Notify duty functions contacts advising that the drill/event has been terminated.

__ IE.needed, THEN perform the following:

o Request Communications secure radio base stations.

Request Communications return po11able communications equipment to storage locations.

o Request Procurement transfer information on outstanding requisitions to normal procurement contacts.

0' Request Transportation Services return relocated equipment to original location.

Request Transportation Services provide transportation home for ERO personnel.

o Request Global Risk Management and Insurance notify insurance companies of change in drill/event status.

INITIAL.19 ESTABLISHING COMMUNICATIONS LINKS BETWEEN MCGUIRE SAMG EVALUATORS SR/0/ A/2000/003 Page l of 1 NOTE:

Operations Procedure Support in the TSC will serve as the lead SAMG evaluator and will be assisted by Reactor Engineer and Systems Engineer in the TSC, as well as Accident Assessment Interface in the EOF. OPS Procedure Support is expected to direct the other evaluators in what they should be looking at strategically, plus ensure that SAEG-1 is completed appropriately as directed by the guidelines.

ESTABLISH communications links between the SAMO evaluators (TSC OPS Procedure Support, TSC Reactor Engineer, TSC System Engineering Manager, and EOF Accident Assessment Interface) by dialing RP spare bridge 9-980-875-4833 (6-party bridge line).

EVALUATE using an alternate bridge line listed below if for some reason the RP spare bridge is unavailable QLif other communications links are desired or needed. Dial the number listed as desired to determine if that bridge is currently being used. If the desired bridge line is not being used. then the appropriate parties may dial in to use it.

EP Controller bridge (I 2 - party) 9-980-875-4575 McGuire site bridge (6 - party) 9-980-875-3030 McGuire site bridge (6 - party) 9-980-875-3200 INITIALS ___

PRINTED NAME __________


~.20 Oconee Recovery SRJO/ A/2000/003 Page I of 2

1. Recovery Guidelines The Recovery Manager shall be responsible for the following:

D I.I D 1.2 Initiate RP/O/B/1000/027, Reentry Recovery Procedure.

Announce as follows:

"Agreement has been reached between Duke Energy, the State of South Carolina and the NRC that the General Emergency classification is terminated. Recovery Operations are being initiated at the site. Actions are underway to determine when people who have been evacuated from their homes can return. As this information is made available, it will be released to the public."

i'TOTE: - The offsit~--~ecovery orga~~;;,;~ti~;~ wiJ(~tay at tf~e*l:~-()j::-nncT~~~rl~ with the counties and state Jl**

radiological Conditions exiSt beyond the ONS site boundary. The onsite recovei-y 1

organization will be established by the Emergency C~oordinator.

O 1.3 Establish Recovery Organization to handle olTsite consequences.

D 1.4 Make the f'ollowing assignments:

Recovery Manager Radiological Assessment Manager Field Monitoring Coordinator Emergency Preparedness Manager EOF Services Manager D 1.5 Ensure staffing for long-term operation.

NOTE:

Once recovery has been determined, the emergency notification message forms are no longer used.

D 1.6 Confor with SEMO (State Emergency Management Director) regarding work in progress at EOF and determine communication channels and notifications expected.

TNITIALS PRINTED NAME ~~~~~~~~~~~~~~

0 1.7 0 1.8.20 Oconee Recovery Consult with each manager regarding activities in progress.

D 1.7.l Radiological Assessment Responsibilities

~

Provide ingestion pathway dose assessments SR/0/ A/2000/003

.Page 2of2 o

Provide ongoing communications with DHEC Nuclear Emergency Preparedness c

Evaluate environmental concentrations within the radiological footprint o

Provide technical assistance to Joint Information Center o

Help plan for reactor building purge as needed 0 I. 7.2 Emergency Preparedness Responsibilities o

Communications to the State and County Management Directors O 1.7.3.

EOF Services Manager Responsibilities o

Ensure AN! (insurance) is set up for public inquiry c

Provide services as required D 1.7.4.

Joint Information Center Responsibilities o

Providing news releases

!)..

Work with media/public to reduce rumors o

Monitoring information being released by news media Maintain Emergency Operations Facility activated and staffed until consensus is reached by Duke Energy and State of South Carolina there is no basis for continuous staffing.

0 1.8.1 Record time and date that Emergency Operations Facility/Joint Information Center were closed.

A. EOF/JIC Closed--------

TimciDate

NOTE:.21 Keowec Hydro Project Dams/Dikes Imminent Failure/Potential Failure Descriptions s1u01 A/20001003 Pagel of l Duke Energy Hydro Group personnel are responsible for evaluation/inspection of Keowee Hydro Project Dams/Dikes AND determining if an Imminent Failure or Potential Failure exists.

Duke Energy Hydro Group personnel will communicate the results of evaluations/inspections to the Keowee Hydro Operator. The Keowee Hydro Operator will notify the SM.

l. Imminent Failure The Imminent Failure emergency level indicates that time has run out, and the dam has failed, is foiling, or is about to fail. Imminent Failure typically involves a continuing and progressive loss of material from the dam. It is not usually possible to determine how long a complete breach of a dam will take. Therefore. once a decision is made that there is no time to prevent failure. the Imminent Failure warning must be issued. For purposes of evacuation. emergency management authorities should assume the worst-case condition that failure has already occurred. (Duke Energy Hydro-Elcctric Plant f:'.'.AP)
2. Potential Failure The Potential Failure emergency level indicates that conditions arc developing at the dam that could lead to a dam failure. Some examples are (I) rising reservoir levels that are approaching the top of the non-overflow section of the dam, (2) transverse cracking of an embankment, and (3) a verified bomb threat. Potential Failure should convey that time is available for analyses, decisions, and actions before the dam could fail. A failure may occur, but predetermined response actions may moderate or alleviate failure.

fNITIALS ___ _

PRINTED NAME ________ _

.22 EOF Evacuation Checklist sRJ01 A12ooo;oo3 Page I of2


I.E..conditions DO NOT allow for a controlled relocation of the facility. THEN perform immediate actions to protect personnel.

A. Notify personnel to re-assemble o Mint Street Parking Deck (Primary) o Fire bird Statue in front of Bechtler Museum (Alternate)

B. Notify the TSC Emergency Coordinator of actions taken

  • Catawba 803-701-5870
o. McGuire 980-875-4950 o Oconee 864-873-3921

____ I.E..conditions allow for a controlled relocation of the facility, THl~N determine alternate EOF location:

o Catawba Event - McGuire Alternate TSC o McGuire Event - Catawba Alternate TSC o Oconee Event - Catawba Alternate TSC Request EOF Emergency Planner to obtain the following:

a 24-1-Iour Position EOF Staffing Log o

EOF Business Continuity Plan o

Catawba. McGuire. and Oconee Emergency Telephone Directories o

ERO Member Contact Information notebook

___ Announce to EOF personnel to exit EOF and move to assembly area (Location designated by EOF Director) with all their procedures and paperwork.

o Mint Street Parking Deck (Primary) o Firebird Statue in front of Bechtler Museum (Alternate)

____ Consider the need to escort NRC and offsite agency personnel from EOF to alternate EOF.

____ Turn over command and control of event to TSC Emergency Coordinator.

o Notify TSC Emergency Coordinator that EOF is evacuating due to (state reason) o Catawba 803-701-5870 o

McGuire 980-875-4950 o

Oconee 864-873-3921 Provide TSC Emergency Coordinator current emergency classification and EAL number, cun-ent Protective Action Recommendations: and status of Emergency Notifications: Message number due at ___ _

____ Request the EOF Emergency Planner call the TSC Emergency Planner to request he call the unaffected site's control room and make them aware of the EOF relocation. *

.22 EOF Evacuation Checklist NOTE: The following actions are taken after exiting the EOF.

SR/0/ A/2000/003 Page 2 of2 Request leads in each EOF fonctional area perform accountability of EOF perso1mel using 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> EOF Posilion Staffing Log.

Consult with Enterprise Security console personnel al 704-382-1234 to determine expected duration of EOF evacuation.

!E.expected duration of evacuation is greater than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or unknown, THEN perform the following:

Direct EOF Personnel to report to the Alternate EOF Location c'i Catawba Alternate TSC Catawba Nuclear Station Administration Building (Building 7720) 4800 Concord Road York. SC 29745-9635 o McGuire Alternate TSC McGuire Nuclear Station Administration Building (Building 7438) 12700 !lagers Ferry Road Huntersville. NC 28078-9340 o

Inform the TSC Emergency Coordinator that EOF is relocating to Alternate EOF Location o

Request TSC notify NRC of EOF relocation Direct EOF Emergency Planner to conduct actions required by EOF Business Continuity Plan.

Return to Enclosure 6.1 of this procedure after reporting to Alternate EOF.

.23 EOF Briefing Guideline SR/0/ A/2000/003 Page 1 of 2 NOTE: Items listep here are suggested topics for routine update briefings (not all topics need be addressed at each briefing). Items actually selected should be based on existing or projected plant conditions and current priorities.

Attributes of Excellent Briefings o

5-10 minutes duration o

Brief for status, not to solve problems Crisp, focused and well controlled Speak to be heard (use PA i r needed)

    • Repeal back required actions o

ALL personnel are attentive

  • ----------'--------------*---------l
1.

EO F Director (open and lead briefing)

  • o: Pre-announce -- 5 n1inute \\:Var11ing brief is about to occur
  • Start Briefing by stating "Attention in the EOF." observe participants to confirm they are ready

~Overview of emergency conditions "Station priorities o Offsite actions being taken o NRC activities related lo emergency Notes:

~-------------------------------~

i--------------*-------------------*--------*---------------;

2.

Assistant EOF Director o

Facility staffing issues and status or additional support requested o

Facility operations expectations (noise levels. procedure use. log keeping. etc.)

o Status of offsite agency communications o

Status of relief shift Notes: ~-----~~---~-~~~~~-~~~~~-~~-~--~--

3.

Accident Assessment Manager o

Cu1Tent Emergency Classification and EAL number/description o

Key parameters/potential paths for Emergency Classification Upgrade o

Reactor condition, core damage assessment.

o Review of key plant conditions (power level. shutdown, trends) o Fission Product Barrier Status, trends, prognosis Core Cooling System Status o

Emergency/abnonnal procedures entered or exited Severe accident guideline status

o.

Status ofNRC Conununications Notes: ~--~~~~~~~-~~~~-~~~~~~~~~~~~~~~~~

4.

r---

5.
6.
7.
8.
9.
10..23 EOF Briefing Guideline SRJO/ A/2000/003 Page 2 of2 Radiological Assessment Manager 0

Status of radiological release compared to EAL thresholds, dose projections. offsite radiological conditions, PARs.

0 Meteorological conditions Field Monitoring Team reports 0

Radiation Protection problem areas being worked and/or needing resolution o*

Chemistry activities and resulls. (e.g. dose equivalent iodine. sample status)

Notes:

Emergency Planner

'Ii:

!E..a security event is in progress, THEN plant access restrictionst status of site security, offsite Local Law Enforcement Agencies assistance requested and/or provided e

IF a medical emergency response (MERT) is in progress, THEN number of victims, whether radiologically or chemically contaminated, offsite EMS response 0

!E.a fire response is in progress, THEN status of fire, offsite FD response Status of site assembly and site evacuation Notes:

Offsitc Agency Communicator 0

Status or offsite agency communications and time next message due Status of TNPO notification Notes:

EOF Log Recorder Items of interest from TSC Log TSC Priorities Notes:

Corporate Communications G

Status of news releases and press conferences 0

Rumors being addressed 0

Internal/External notifications made (Duke Energy leadership team~ ECOC. JIC, state government)

Notes:

(IF present) Offsite Agencies Q

Discuss status of offsite agency actions EOF Director (close briefing)

<o IF the NRC is present, THEN provide them with opportunity to contribute to brief

o.

Ask if any others need to rcpo11 "Important information" 0

Summarize priorities Ask if there are any questions State "END OF BRIEF"

INITIAL.24 Setup of Catawba Alternate EOF in McGuire Achnin Bldg.

SR/0/ A/2000/003 Page 1 of 3

--=IF-.SpectraLink phones with headsets can be obtained from McGuire TSC, THEN take them to alternate EOF location (Administration Building layout on Page 3 of3 of this enclosure).

__ Locate assigned Administration Building area shown on the layout drawing on Page 3 of 3 of this enclosure NOTE:

I. Alternate TSC phone sets are stored in the CRX Equipment Room, Room 112.

2. The EOF Emergency Planner and EOF Data Coordinator can assist with phone and computer connections.
3. !E..a computer is needed, THEN a computer that is not being used for another ERO function (e.g., Regulatory Compliance section, Business Management group, Human Resources group) may be used.
4. !E..access to the CBX equipment Room, Room 112, is needed prior to the arrival of the EOF Emergency Planner. THEN a key to the door can be obtained from Security at the SAS.
5. Printer paths for McGuire Nuclear Station Administration Building Mail Room Printers are MNADMI06 and MNADMDPl.

__ Set up assigned location as follows:

o Obtain phone equipment necessary to conduct ERO function at assigned location and connect to wall and ceiling outlets.

o IF a computer is needed, THEN request help from EOF Data Coordinator.

o IF necessary, THEN obtain copies of position procedure enclosure from procedure SRJO/B/2000/003, Activation of the EOF, located in Emergency Preparedness Procedures cabinet.

o

!E..printing capability is needed, THEN setup printers using DAE Printer Selector Program.

INITIALS PRINTED NAME ___________ _

.24 Setup of Catawba Alternate EOF in McGuire Admin Bldg.

SR/0/ A/2000/003 Page 2of3 o

LE.copies of plant procedures are required, THEN perform one of the following:

For Emergency Plan Implementing Procedures (RPs, SI-Is, and SRs), make copy from Control Copy located in Emergency Preparedness Procedures cabinet.

For all other procedures, print a copy from Fusion on DAE using McGuire Admin Building Mail Room printer MNADM106 or MNADMDPI.

o Assume or continue ERO role according to procedure SR/O/B/2000/003, Activation of the EOF.

.24 Setup of Catawba Alternate EOF in McGuire Admin Bldg.

STUO/ A/2000/003 Page 3 of 3 (Executive Board Room 111, Admin. Building)

RX l'h)Sics 4962 NC 4954 875-1955 SC PC 4968 875-4778 (ENSJ 875-4788 (RSCLJ 4959 RAM

~Hhcr EOF Position Locations OPS Interface AAI AAM c

4951 4520 875-4789{PMCLJ 875*l770(HPNJ PC 875-1'!53 EOF Log Recorder 0

Others (EP Room 114) - *4458. *4977. *875-1951.

4950 Emcrgcnc)

Planner

. Ringuown

  • *; Phone lo EOF EOF Dir

. Ringdown Phone lo OSC

  • 2211 e

Off site Communicator (EP Room 1158 -- *4970. *SSN 315. *Radio. *875-1951.

o Data Coordinator (CBX Equipment Room I I 2) -- *4999.

o Dose Assessor (SCR Room I OOD) -- *4405.

11 Off site Monitoring (McGuire TSC) *4969. *4976 o

Public Affairs (Rooms I I 8 and 141) -- *4400. *4402, *4233.

o NRC (NRC Office~ Room 126) --

  • 875-1681.

o Other, use Jaguar Room as needed (Room 144, EOF Services Mgr.) -- *4826.

Office Equipment

~

FAX (Mail Room, Room 116) -- *875-4506.

o FAX (EP Room 114) -- *875-4382.

o Copier (Mail Room, Room 116).

o Copier (SA Room 170).

o CBX (CBX Office inAdmin. Building Lobby).

  • Indicates existing phones. All others are to be plugged in when the Alternate TSC is activated.

.25 sRJO/ A/2000/003 Setup of McGuire or Oconee Alternate EOF in Page I of 3 Catawba Admin Bldg.

INITIAL IF SpectraLink phones with headsets can be obtained from Cata\\vba TSC, THEN take them to

__ alternate EOF location (Administration Building layout on Page 2of3 of this enclosure).

__ Locate assigned Administration Building area shown on the layout drawing on Page 2 of 3 of this enclosure.

NOTE:

I. The EOF Emergency Planner and EOF Data Coordinator can assist with computer connections.

2. IE.a computer is needed, THEN a computer that is not being used for another ERO function (e.g., Regulatory Compliance section. Performance Improvement Team. Human Resources group) may be used.
3. Printer paths for Catawba Nuclear Station Administration Building Printers are CNSADM2 for Copier Room (Room 143) and CNADM127 for Room 127.

___._Set up assigned location as follows:

e IE.a computer is needed, THEN request help from EOF Data Coordinator.

o IE.necessary. THEN obtain copies of position procedu1:e enclosure from procedure SR/O/B/2000/003. Activation of the EOF. located in Emergency Preparedness procedures cabinet.

o J.E..printing capability is needed. THEN.setup printers using DAE Printer Selector Program.

o IE.copies of plant procedures are required, THEN perform one of the following:

o For Emergency Plan Implementing Procedures (RPs,, SHs, and SRs), make copy from Control Copy located in Emergency Preparedness Procedures cabinet.

o For all other procedures, print a copy from Fusion on DAE using Catawba Admin Building Mail Room printer CNSADM2.

o Assume or continue ERO role according to procedure SR/O/B/2000/003~ Activation of the EOF.

INITIALS PRINTED NAME ___________ _

I STATE AND COUNTY 153B WORK AREA STATE AND COUNTY 1S3A WORK AREA 137B ACCIDENT ASSESS LOBBY I 152.

t.:l 0

~

I 137A DOSE ASSESS

~

KITCHEN RMl61 l==:I BUSINESS t===i BUS 106 MGR ALTERNATE EOF IN THE CNS ADlVllN BLDG EMERGENCY MAIL KIT STORAGE RMl48 ROOM RM HR BVS 164 HR 1---

HR HR RM 144 RJl.f 1431 EOF SVC NRC EQUIP BBA NOS RMl45 NOS NOS EP MGR RM 1300 EP RM 130C HU MGR RM 1308 OE ADM I

'\\

I DATA EMERG COO RD PLANNER I

I OFFS I TE COMM u---

  • ~

~

~

VP ASST SITE VP PLANT ENGR NOS BREAf COPY Pl RA RM MGR MGR u=i REG AFFAIRS NUC INT RMl:z.7 EOfDIA.EOtl> A..\\.M MGR SS MGR OE MGR NEWS RAM SfAThS MGR LUG RECOl!ll£R

MGR, 01<'},"SfTE COMM.

PUBL PUBLIC Af.1AtR'i SPOKES VP CONJ'. ROOM flUit. t 14) rJJ c

"O 0.....

~

!')

("'.)~

~ =

~ "'!

~

(':>

~= =

!')

Q

>0 l;ll c

c. !')

'"I

= §

-* (':>

~

= (':>

N

~> Ul

c. -

tr.I

(':>

"'! =

I:>

~

0

~

s*

'""Cl en PJ ~

(IQ

("!) 0 N -.._

0 >

.....;., t::>

w 0

0 0 --

0 0 w

.25 Setup of McGuire or Oconee Alternate EOF in Catawba Admin Bldg.

P;1b\\lclnfo

<*001dm *.i.101

\\"P fO;"il-'l*:Rr:o.irt uoo:u EOE Functional Areas:

f:nF Tc.:h l.i:liiCI\\

L.o;:

Rccmdi:r l.<-,itl Oft'sJlcAt,rn<.:)

Commt;UJ¢t~or Amstinf f.OFP11ct101 rnP Dm:i:1m SR/0/ N2000!003 Page 3of3 VP Conf'crence Room**:_ Command & Control Center (EOF' Director, Accident Assessment M~irnger, Rad Assessment Manager, Lead Offsite Agency Communicator, EOF Log Recorder, EOF Emergency Planner EOF Tech Liaison, Public Information Coordinator, Slate EM Representatives)

EP Manager's Office-- Offsite Comnmnicalors EP Cubes - Data Coordinator Touchdown Room 142 - EOF Services PA Manager Office - News Manager, Public Spokesperson Room 153 A/B - State and County Work Area NRC Resident Inspector Offices - NRC Site Team Room 13 7 A - Dose Assessment Room 1378 -Accident Assessment Catawba TSC (Not Shown) - Offsite Monitoring

.26 NRC Response Team Briefing sRJO/ N20001003 Page 1 of 2 A) Emergency Classification Time Declared:

am/pm (Ctment Class)

Unusual Event

.6. Ale1t SiteAreaEmergency.6. General Emergency EAL Descriptor Text:

Provide a brief summary of the event and mitigating actions in progress:-----------

............ -~_,,,,,,, __

~.. ~....................,.,.,,.. ~,--

B) Fission Product' Barrier Status Fuel RCS CTMT Intact:

~

~

~

Potential Loss:

.6.

~

.6.

Lost:

.6.

.6.

.6.

C) Plant Conditions Mode I - Power Operations Mode 2 - Startup Mode 3 - Hot Standby Mode 4 - Hot ShutdO\\vn Mode 5 - Cold Shutdown Mode 6 - Refueling Time of shutdown: ____ am/pm Stable

.6. Improving Unstable

.6. Deteriorating Briefly describe equipment, instrument or other problems:---------------

D) Radiological Release None or Imminent In Progress Terminated

.6. Controlled

.6. Uncontrolled Start Time:_ am/pm Estimated Duration: _______ _

E) Onsite Protective Actions None or Site Assembly I Accountability Local Area Evacuation Protected Area Evacuated Site Evacuated Offsite Assembly Emergency Exposures Authorized Potassium Iodide Issued F) Response :Facilities Activated None or Technical Support Center Operations Support Center Emergency Operations Faci lily Joint Information Center G) Offsitc Assistance Requested None or Medical Fire Department Law Enforcement H) Offsite Notifications

__ am/pm

__ am/pm

__ am/pm County

~ INPO State

.6. ANI News Release I) Protective Action Recommendations None or Evacuate: ----------

Shelter:-----------

J) Off site Actions/Response None iss11ed, or:

Schools

.6. Recreation Areas Other:-----------

Evacuate:

Shelter:

Unde-rw_a_y--~ OR--.6. Completed

.26 NRC Response Team Briefing K) Additional Notes SR/01 A/2000/003 Page 2 of2

--~---,

NOTE:

This briefing is intended to provide general information related to the event. More detailed information will be available from individual licensee counterparts.

Additional Discussion Items:

I. Personnel safety (as applicable)

a.

Personnel accountability requirements

b.

Radiation protection requirements

c.

Industrial safely requirements

d.

Protective equipment requirements

e.

Reporting emergency situation (e.g.. fire/medical)

2. Emergency evacuation
a.

Location of exits

b.

Location of emergency assembly areas

3. Personal comfort
a.

Location of restrooms

b.

Location of water, beverages. and food

c.

Location of quiet area

4. Facility specific information
a.

Prohibited activities (e.g., use of cell phones~ cameras. cordless phones, etc.)

b.

Facility telephones (how to call outside the facility, reserve phones, etc.)

c.

Telephone numbers (e.g., response facility phone directory/phone listing)

d.

Reference locations and access

e.

Making photo copies

f.

Sending/receiving facsimiles

g.

Logistical assistance/support

{l}

{2}

{3}

{4}

{5}

{6}

{7}

{8}

{9)

(I 0}

{ 11}

12}

{ 13}

{ 14}

{15}

{16}

{17}

{18}

{19}

{20}

{21}

{22}

I')"'

l-.:> J

{24}

{26}.27 Commitments for SR/O/ A/2000/03 SRJO/ A/2000/003 Page I of 4 PIP O-M97-4210 NRC-1, NRC Commitments per H.B. Barron's 11/6/97 response to exercise weakness.

Deleted PIP 2-C96-0273, Unit l LOOP 2/6/1996 flO CFR 50.54(x)/(y)]

Deleted Deleted Deleted Deleted Deleted Deleted Deleted Deleted Deleted Deleted Deleted Deleted Deleted NIA Deleted Deleted Deleted Deleted Deleted PIP G-03-606, Final Rule. "Consideration of Potassium Iodide in Emergency Plans" (66 FR 5427)

Deleted Deleted Deleted

{27}

Deleted

{ 28}

Deleted

{29}

Deleted

{30}

Deleted

{ 31 }

Deleted

{ 32}

Deleted

( 33}

Deleted

{34}

Deleted.27 Commitments for SR/O/ A/2000/03 SR/0/ A/2000/003 Page 2of4

35 J PIP-M-05-3631, Failure to update the Emergency Plan in accordance with evaluation of NRC RIS 2004-13, "Consideration of Sheltering in Licensee's Range of Protective Action Recommendations" and 2004-13 Supplement 1.

( 36 J PIP-C-05-4854, Failure to update the Emergency Plan in accordance with evaluation of NRC RIS 2004-13, "Consideration of Sheltering in Licensee's Range of Protective Action Recommendations" and 2004-13 Supplement I.

{37}

Deleted

{38)

Deleted

{39}

Deleted

{40}

Deleted

{ 41}

Deleted

{42}

Deleted

{43}

Deleted

{44}

Deleted

{45}

Deleted

{46}

Deleted

{47}

Deleted

{48}

Deleted

{49}

Deleted

{50)

Deleted

{ 51}

PIP M-09-4514, C.A. 19

_J

{ 52}

Deleted

{53}

Deleted

[ 54}

Deleted

{ 5 5}

Deleted

{ 56}

Deleted

{ 57}

Deleted

{ 5 8}

Deleted

{59}

Deleted l 60}

Deleted.27 Commitments for SR/O/ A/2000/03 SRJO/ A/2000/003 Page 3 of 4

[61]

PIP 0-11-1177, DocuTracks NG0-20 I 2-000 I 22, Catawba, McGuire. and Oconee Emergency Plan Minimum Staffing License Amendment Request, approved 7/29/1 I I 62 l Deleted

63 l Deleted

{ 64}

Deleted

{ 65)

Deleted

{ 66}

Deleted

{ 67}

Deleted

{ 68}

Deleted

{69}

Deleted

{ 70}

Deleted

{ 71 }

Deleted

{ 72}

Deleted

{ 73}

Deleted

{74}

Deleted

{75}

PIP G-13-1461, C.A. 19, IER Ll-13-10. "Nuclear Accident at the Fukushima Daiichi Nuclear Power Station"

{76}

PIP M-12-2339. C.A. 34. NRC Near Term Task Force (NTTF) Recommendation 9.3 EP Staffing - Fukushima Dai-lchi Accident

.27 Commitments for SR/O/A/2000/03 SR/0/ A/2000/003 Page 4 of4

{77}

IER Ll-13-10, "Nuclear Accident at the Fukushima Daiichi Nuclear Power Station"

{78}

IER Ll-11-14, "Near-Term Actions to Address the Effects of an Extended Loss of All AC Power in Response to the Fukushima Daiichi Event"

{ 79}

Deleted

{ 80}

Deleted

{ 81}

Deleted

{ 82}

Deleted