ML17180A077: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17180A077
| number = ML17180A077
| issue date = 07/27/2017
| issue date = 07/27/2017
| title = Correction Letter for the Receipt and Availability of the License Renewal Application for the River Bend Station, Unit 1 (CAC No. MF9747)
| title = Correction Letter for the Receipt and Availability of the License Renewal Application for the River Bend Station, Unit 1
| author name = Stuchell S
| author name = Stuchell S
| author affiliation = NRC/NRR/DLR/RPGB
| author affiliation = NRC/NRR/DLR/RPGB
| addressee name = Maguire W F
| addressee name = Maguire W
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
| docket = 05000458
| docket = 05000458
| license number =  
| license number =  
| contact person = Sayoc E C. NRR-DLR 415-1924
| contact person = Sayoc E. NRR-DLR 415-1924
| case reference number = CAC MF9747
| case reference number = CAC MF9747
| document type = Letter
| document type = Letter
| page count = 2
| page count = 2
| project = CAC:MF9747
| project = CAC:MF9747
| stage = Request
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001             July 27, 2017 Mr. William F. Maguire Site Vice President River Bend Station, Unit 1 5485 U.S. Highway 61N St. Francisville, LA 70775  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 27, 2017 Mr. William F. Maguire Site Vice President River Bend Station, Unit 1 5485 U.S. Highway 61N St. Francisville, LA 70775  


==SUBJECT:==
==SUBJECT:==
CORRECTION LETTER FOR RECEIPT AND AVAILABILITY OF THE LICENSE RENEWAL APPLICATION FOR THE RIVER BEND STATION, UNIT 1 (CAC NO. MF9747)
CORRECTION LETTER FOR RECEIPT AND AVAILABILITY OF THE LICENSE RENEWAL APPLICATION FOR THE RIVER BEND STATION, UNIT 1 (CAC NO. MF9747)  


==Dear Mr. Maguire:==
==Dear Mr. Maguire:==
On May 31, 2017, the U.S. Nuclear Regulatory Commission (NRC) received the Entergy Operations, Inc. application dated May 25, 2017 (Agencywide Documents Access and Management System Accession No. ML17153A282), for the Renewal of Operating License No. NPF-47 to operate River Bend Station, Unit 1 (RBS).
This is a correction for the {{letter dated|date=June 20, 2017|text=letter dated June 20, 2017}}, ADAMS Accession No. ML17156A093, subject Receipt and Availability of the License Renewal Application for the River Bend Station, Unit 1 (CAC NO. MF9747), and clarifies that Renewal of Operating License No. NPF-47 would allow River Bend Station, Unit 1 (RBS) to operate until August 29, 2045, vice what was originally indicated in the previous letter.
If you have any questions on this matter, please contact Mr. Sayoc by telephone at 301-415-4084 or e-mail at Emmanuel.Sayoc@nrc.gov, Ms. Keegan at 301-415-8517 or e-mail at Elaine.Keegan@nrc.gov, as appropriate.
Sincerely,
/RA/
Sheldon Stuchell, Chief Projects Management and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-458 cc w/encl: Listserv


On May 31, 2017, the U.S. Nuclear Regulatory Commission (NRC) received the Entergy Operations, Inc. application dated May 25, 2017 (Agencywide Documents Access and Management System Accession No. ML17153A282), for the Renewal of Operating License    No. NPF-47 to operate River Bend Station, Unit 1 (RBS). This is a correction for the letter dated June 20, 2017, ADAMS Accession No. ML17156A093, subject "Receipt and Availability of the License Renewal Application for the River Bend Station, Unit 1 (CAC NO. MF9747)," and clarifies that Renewal of Operating License No. NPF-47 would allow River Bend Station, Unit 1 (RBS) to operate until August 29, 2045, vice what was originally indicated in the previous letter. If you have any questions on this matter, please contact Mr. Sayoc by telephone at 301-415-4084 or e-mail at Emmanuel.Sayoc@nrc.gov, Ms. Keegan at 301-415-8517 or e-mail at Elaine.Keegan@nrc.gov, as appropriate. Sincerely,                    /RA/              Sheldon Stuchell, Chief  Projects Management and Guidance Branch  Division of License Renewal        Office of Nuclear Reactor Regulation Docket No. 50-458  cc w/encl:  Listserv W. Maguire 
ML17180A077
 
*Concurred via e-mail OFFICE LA:DLR*
==SUBJECT:==
PM:DLR:RPGB PM:DLR:RPGB PM:DLR:RERP BC:DLR:RERP BC:DLR:RPRG NAME YEdmonds ABillochColón ESayoc EKeegan BBeasley SStuchell DATE 7/19/2017 7/19/2017 7/19/2017 7/19/2017 7/26/2017 7/27/2017}}
CORRECTION LETTER FOR RECEIPT AND AVAILABILITY OF THE LICENSE RENEWAL APPLICATION FOR THE RIVER BEND STATION, UNIT 1 (CAC NO. MF9747)
DISTRIBUTION: E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpgb Resource RidsNrrDlrRerp Resource RidsNrrPMRiverBendProject Resource RidsOgcMailCenter Resource -------------------------------------------- ESayoc, NRR ABilloch, NRR EKeegan, NRR  BBeasley, NRR BRogers, NRR SStuchell, NRR DAlley, NRR DRudland NRR  TMartinezNavedo, NRR SBailey NRR BWittick, NRR SBloom, NRR TBuchannan, NRR NMartinez, NRR LRegner, NRR STurk, OGC JSowa, RIV BrianParks, RIV BMaier, RIV  GPick, RIV JKozal, RIV CYoung, RIV MYoung, RIV GWerner, RIV DMcIntyre, OPA VDricks, RIV OPA AMoreno, OCA BBurnell, OPA Thomas R. Broussard, tbrous1@entergy.com David Lach, dlach@entergy.com Danny Williamson, dwill21@entergy.com Timothy Schenk, tschenk@entergy.com            ADAMS Accession No. ML17180A077  *Concurred via e-mail OFFICE LA:DLR* PM:DLR:RPGB PM:DLR:RPGB PM:DLR:RERP BC:DLR:RERP BC:DLR:RPRG NAME YEdmonds ABillochColón ESayoc EKeegan BBeasley SStuchell DATE 7/19/2017 7/19/2017 7/19/2017 7/19/2017 7/26/2017 7/27/2017 OFFICIAL RECORD COPY 
}}

Latest revision as of 18:34, 8 January 2025

Correction Letter for the Receipt and Availability of the License Renewal Application for the River Bend Station, Unit 1
ML17180A077
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/27/2017
From: Stuchell S
NRC/NRR/DLR/RPGB
To: Maguire W
Entergy Operations
Sayoc E. NRR-DLR 415-1924
References
CAC MF9747
Download: ML17180A077 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 27, 2017 Mr. William F. Maguire Site Vice President River Bend Station, Unit 1 5485 U.S. Highway 61N St. Francisville, LA 70775

SUBJECT:

CORRECTION LETTER FOR RECEIPT AND AVAILABILITY OF THE LICENSE RENEWAL APPLICATION FOR THE RIVER BEND STATION, UNIT 1 (CAC NO. MF9747)

Dear Mr. Maguire:

On May 31, 2017, the U.S. Nuclear Regulatory Commission (NRC) received the Entergy Operations, Inc. application dated May 25, 2017 (Agencywide Documents Access and Management System Accession No. ML17153A282), for the Renewal of Operating License No. NPF-47 to operate River Bend Station, Unit 1 (RBS).

This is a correction for the letter dated June 20, 2017, ADAMS Accession No. ML17156A093, subject Receipt and Availability of the License Renewal Application for the River Bend Station, Unit 1 (CAC NO. MF9747), and clarifies that Renewal of Operating License No. NPF-47 would allow River Bend Station, Unit 1 (RBS) to operate until August 29, 2045, vice what was originally indicated in the previous letter.

If you have any questions on this matter, please contact Mr. Sayoc by telephone at 301-415-4084 or e-mail at Emmanuel.Sayoc@nrc.gov, Ms. Keegan at 301-415-8517 or e-mail at Elaine.Keegan@nrc.gov, as appropriate.

Sincerely,

/RA/

Sheldon Stuchell, Chief Projects Management and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-458 cc w/encl: Listserv

ML17180A077

  • Concurred via e-mail OFFICE LA:DLR*

PM:DLR:RPGB PM:DLR:RPGB PM:DLR:RERP BC:DLR:RERP BC:DLR:RPRG NAME YEdmonds ABillochColón ESayoc EKeegan BBeasley SStuchell DATE 7/19/2017 7/19/2017 7/19/2017 7/19/2017 7/26/2017 7/27/2017