ML24057A306: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:RM     DOCUMENTATION                               NO. BW-SDP-006,                     Rev.       0                                                                                                                                                   PAGE     NO.1
{{#Wiki_filter:RM DOCUMENTATION NO. BW-SDP-006, Rev. 0 PAGE NO.1 STATION: Braidwood UNIT(S) AFFECTED:
 
UNIT2 TITLE: Braidwood 28 AF Pump Fuel Oil Leak SDP Sensitivities  
STATION:           Braidwood UNIT(S)                 AFFECTED:                                       UNIT2
 
TITLE:         Braidwood                                   28 AF     Pump                           Fuel     Oil Leak             SDP   Sensitivities


==SUMMARY==
==SUMMARY==
This document describes the FPIE and FPRA modeling, associated results, and sensitivities discussed in reference to the 2B AF pump fuel oil leak at Braidwood.
URE(s) Impacted:
None Number of pages:
32 gages, including this gage.
RM Document Level:
Level 1, ger ER-AA-600-1012 [1].
Internal RM Documentation Electronic Calculation Data Files: BW-SDP-006_R0_Attachment.zip, 83,176 KB, 2/24/2024, 9:45 AM Co-Prepared by: Andrew Christensen
/ Signed Via Email
/2/24/2024 Print Sign Date Co-Prepared by: Ethan Graven
/ Signed Via Email
/2/24/2024 Print Sign Date Co-Prepared by: Usama Farradj
/ Signed Via Email
/2/24/2024 Print Sign Date Co-Prepared by: Lynn Kolonauski
/ Signed Via Email
/2/24/2024 Print Sign Date Reviewed by: Adam Harden
/ Signed Via Email
/2/24/2024 Print Sign Date Reviewed by: Donald Vanover
/ Signed Via Email
/2/24/2024 Print Sign Date Approved by: Roy Linthicum
/ Signed Via Email
/2/24/2024 Print Sign Date Method of Review: [ X] Detailed [] Alternate This RM documentation supersedes:
N/A in its entirety.
External RM Documentation Prepared by: N/A I
I Print Sign Date Approved by: N/A I
I Print Sign Date Do any ASSUMPTIONS I ENGINEER/NG JUDGEMENTS require later verification? [] Yes [ X] No Tracked By: AT#, URE# etc.)


This document                                          describes the FPIE  and                      FPRA      modeling,          associated                  results, and                      sensitivities discussed        in reference to  the 2B  AF    pump                      fuel oil leak at  Braidwood.
Braidwood Unit 2 2B AF Pump Fuel Oil Leak SDP Sensitivities CONTACTS Braidwood Site Risk Mgmt Engineer Andrew Christensen (773) 718-6601 Fleet. Risk Mgmt Engineer Ethan Graven (224) 422-9458 Internal Events Model Owner Adam Harden Fire PRA Model Owner Usama Farradj 2  
 
URE(s)                    Impacted:                                                                                                                    None Number                      of pages:                                                                                                                          32    gages,            including    this gage.
RM      Document                                              Level:                                  Level 1,      ger ER-AA-600-1012              [1].
 
Internal                RM      Documentation Electronic              Calculation                                  Data              Files: BW-SDP-006_R0_Attachment.zip,                                              83,176      KB,    2/24/2024,        9:45    AM
 
Co-Prepared                              by:                                            Andrew                Christensen                                                                                                        /  Signed  Via                Email                                                                                                                                                                                                                                  /2/24/2024 Print                                                                                                                                                                                                                                                                                                                                                                                                                                            Sign                                                                                                                                                                                                                                                                                                                                                                                                                  Date
 
Co-Prepared                            by:                                                  Ethan            Graven                                                                                                                                                                                                                                    /  Signed  Via                Email                                                                                                                                                                                                                              /2/24/2024 Print                                                                                                                                                                                                                                                                                                                                                                                                                                Sign                                                                                                                                                                                                                                                                                                                                                                                                                                Date
 
Co-Prepared                              by:                                              Usama                                              Farradj                                                                                                                                                                                        /  Signed  Via                Email                                                                                                                                                                                                                                            /2/24/2024 Print                                                                                                                                                                                                                                                                                                                                                                                                                                            Sign                                                                                                                                                                                                                                                                                                                                                                                                                  Date
 
Co-Prepared                            by:                                                  Lynn                                Kolonauski                                                                                                                                                                                          /  Signed  Via                Email                                                                                                                                                                                                                                        /2/24/2024 Print                                                                                                                                                                                                                                                                                                                                                                                                                                              Sign                                                                                                                                                                                                                                                                                                                                                                                                                  Date
 
Reviewed              by:                                            Adam                        Harden                                                                                                                                                                                                                                                                          /  Signed  Via                Email                                                                                                                                                                                                                                        /2/24/2024 Print                                                                                                                                                                                                                                                                                                                                                                                                                                            Sign                                                                                                                                                                                                                                                                                                                                                                                                                                Date
 
Reviewed              by:                                                  Donald                  Vanover                                                                                                                                                                                                                                                              /  Signed  Via                Email                                                                                                                                                                                                                                            /2/24/2024 Print                                                                                                                                                                                                                                                                                                                                                                                                                              Sign                                                                                                                                                                                                                                                                                                                                                                                                                    Date
 
Approved                            by:                                                  Roy                        Linthicum                                                                                                                                                                                                                                                          /  Signed  Via                Email                                                                                                                                                                                                                                        /2/24/2024 Print                                                                                                                                                                                                                                                                                                                                                                                                                                            Sign                                                                                                                                                                                                                                                                                                                                                                                                                                Date
 
Method          of    Review:                      [ X] Detailed [] Alternate This RM    documentation                                                                      supersedes:                                                                                                                                                                N/A                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              in        its entirety.
 
External                  RM      Documentation Prepared            by:                                      N/A                                                                                                                                                                                                                                                                                                                                                                                                                                                          I                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        I
-                                                                                                                                                                                                                                                                                                                                                                                                                    Print                                                                                                                                                                                                                                                                                                                                                                                                                                              Sign                                                                                                                                                                                                                                                                                                                                                                                                                                Date Approved                            by:                            N/A                                                                                                                                                                                                                                                                                                                                                                                                                                                        I                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        I
-                                                                                                                                                                                                                                                                                                                                                                                                                              Print                                                                                                                                                                                                                                                                                                                                                                                                                                Sign                                                                                                                                                                                                                                                                                                                                                                                                                    Date Do          any                              ASSUMPTIONS                              I ENGINEER/NG        JUDGEMENTS                        require later verification?                [] Yes        [ X] No            Tracked By:            AT#,      URE#                    etc.)
Braidwood                                                                         Unit               2
 
2B       AF           Pump                                                                 Fuel             Oil Leak                           SDP Sensitivities
 
CONTACTS                                                                                                                                                                                                                                                                                                                                                                                                                                                                             Braidwood
 
Site Risk Mgmt   Engineer                                                                                                                                                             Andrew                 Christensen (773)     718-6601
 
Fleet. Risk Mgmt   Engineer                                                                                                                                                                                                                         Ethan           Graven                   (224)   422-9458
 
Internal       Events   Model Owner                                                                                                                                                                                                                                                                                                             Adam                       Harden
 
Fire PRA   Model Owner                                                                                                                                                                                                                                                                                                                                                     Usama                                             Farradj
 
2 Table            of    Contents
 
1.0 EVENT          OVERVIEW                            ...................................................................................................................................................                                .4


2.0 MAJOR PRA     MODEL REFINEMENTS FOR THE SDP ....................................................................................................                 4 2.1         FPIE ....................................................................................................................................................                           4 2.2   FPRA     ..................................................................................................................................................                           5
Table of Contents 1.0 EVENT OVERVIEW....................................................................................................................................................4 2.0 MAJOR PRA MODEL REFINEMENTS FOR THE SDP.................................................................................................... 4 2.1 FPIE.................................................................................................................................................... 4 2.2 FPRA.................................................................................................................................................. 5 3.0 RESULTS................................................................................................................................................................... 5 4.0 SENSITIVITIES........................................................................................................................................................... 5 4.1 FLEX HEP Sensitivity......................................................................................................................... 5 4.2 28 AF Pump Failure Probability Sensitivity........................................................................................ 9 4.3 Sensitivity Results............................................................................................................................... 9 4.4 Impact from External Events............................................................................................................. 11 4.5 Additional Sensitivity......................................................................................................................... 11 4.6 Key Conservatisms........................................................................................................................... 12  
 
3.0 RESULTS           ...................................................................................................................................................................                                   5
 
4.0 SENSITIVITIES ...........................................................................................................................................................                               5 4.1       FLEX       HEP   Sensitivity .........................................................................................................................                     5 4.2 28 AF   Pump                         Failure Probability   Sensitivity ........................................................................................               9 4.3   Sensitivity Results ...............................................................................................................................                     9 4.4   Impact                   from         External     Events .............................................................................................................                       11 4.5 Additional Sensitivity .........................................................................................................................                         11 4.6     Key           Conservatisms       ...........................................................................................................................                         12


==5.0 CONCLUSION==
==5.0 CONCLUSION==
S ........................................................................................................................................................                               12
S........................................................................................................................................................ 12  


==6.0 REFERENCES==
==6.0 REFERENCES==
...........................................................................................................................................................                                 13
........................................................................................................................................................... 13 APPENDIX A FPIE AND FPRA HEP CHANGES................................................................................................................. 14 APPENDIX B ADDITIONAL MODEL CONSERVATISMS.................................................................................................... 26 APPENDIX C SENSITIVITY CALCULATIONS AND EXTERNAL HAZARDS EXTRAPOLATION................................................ 30 3  
 
APPENDIX A FPIE AND FPRA   HEP CHANGES .................................................................................................................                   14
 
APPENDIX B ADDITIONAL MODEL CONSERVATISMS ....................................................................................................                 26
 
APPENDIX C SENSITIVITY       CALCULATIONS     AND   EXTERNAL HAZARDS   EXTRAPOLATION ................................................ 30
 
3 BW-SDP-006,                  Rev.      0
 
1.0    Event        Overview Elevated fuel content                    was                    identified in  the 2B  Auxiliary    Feedwater      (AF)  diesel engine            lube          oil sample during    quarterly sampling.          A  confirmatory                          sample          determined the fuel content                  was                  above                                fault limits and could                  not            be          evaluated              to    be            acceptable.                          An            emergent        72-hour LCO                                                                                                                                        entry      was                  made                        to    perform  repairs which      found                      fuel leaks at compression                            fittings on                      2 fuel injector return  lines and                      exited on                      9/23/2023. The fuel lines and                    fittings were      originally replaced  during      preventative maintenance                                                during    A2R23    (spring 2023). The  last previous      in-range                oil sample        was                  taken            on                      5/19/2023.      Fuel  leaks were      identified on                        fuel injectors that had              been                        refurbished at  Paragon,                                          Inc.                  The    16  units were      returned  to    stock at                                                                                                    Byron                          Station on                        March              27,    2023,        PO    1390618  was                    issued to    Paragon                                    March              29,    2023,    and                      repair units were      received back                          onsite at  Braidwood                          Station from      Paragon                                          on                      April 17,  2023. Material condition                deficiencies with refurbished fuel injectors, including  fuel injector cap                  sealing surface          defects and                                                                                                                                                  degraded        O-ring, resulted in  diesel fuel leaking into the diesel engine            oil.
 
Testing was                performed      on                        a            Detroit Diesel Series 149  diesel engine          to  determine if the 2B  AF  diesel engine          could              have            performed    its safety function                of driving the 2B  AF    pump                        and                    other connected equipment          for a              period of at  least 24  hours.              The  engine          started with fuel oil diluted lubricating oil representative of the 2B  AF  engine          conditions                and                      operated          in  this condition                  for over      24  hours,              with additional fuel oil being          added              to  the lube          oil during      the test to    represent the September        2023  as-found condition.                Based            on                        the successful        performance                          of the test engine          with the fuel oil diluted lube          oil and MPR's  evaluation                    determining the test addressed      all of the likely engine          failure modes,                    MPR    concluded that there is reasonable                                  assurance                                        the Braidwood                            2B    AF    Pump                      Diesel Drive would                    have            performed    its safety function              of driving the 2B  AF    pump                    and                      other connected                                  equipment            for at  least 24  hours                [1]
 
Based            on                        this testing, the 2B  AF    pump                      would                    have            met  its PRA  success                    criteria and                      PRA    mission    time.
Therefore, the 2B  AF    pump                      would                      be          considered            available        for the duration                of the SOP  exposure                          period.
Following      IMC  0609  Appendix            A  Exhibit 2,      the 2B  AF    pump                    would                      have            maintained                      its PRA  functionality and                    would                  screen            as          Green        [2]. The  following PRA    model          refinements, results, and                      sensitivities are provided under            the assumption                            that the pump                      would                    not          have            met  its mission      time, in  the event  the NRC does          not          agree    that PRA    success                  criteria and                        PRA    mission    time are      met.
 
2.0    Major            PRA        Model          Refinements                    for    the SDP 2.1        FPIE The    major            model            refinements made                        to  the FPIE    model          are      as          follows:
* Refined support        system          initiating event    (SSIE)  fault trees to  improve      quantification      times
* Included                  loss of ESF AC    bus                    initiators as          general    transients o                                            Controlled shutdown                            following loss of  ESF  AC    bus                  would                    not            need            to    recognize          loss of secondary                                            cooling                as        FW              is available        during    shutdown.
* Incorporated                            more                credit to  the DC  crosstie to  opposite unit DC    bus,                    specifically adding        credit for DC  crosstie (train A;    train B already              credited) within 1 hour            of associated                battery      charger      not being        energized.
o                                            Credited the DC    bus                        111      to    211          DC  crosstie  (for controlled shutdown                              following loss of ESF AC      bus                  initiating events  only).
* Medium            Head              (MH)    FLEX      pump                    credit to  supply        flow to  Steam            Generators            (SGs) from      the RWST,                including      credit to  the N+1      FLEX      pump                    after 4  successful          hours            of the first FLEX    pump.
* Updated                    loss of AC    power            recovery                values        for SOP  Exposure                          Period 1 due            to  credit from      ~2    hour 2B  AF    pump                      demonstrated                      run                time during      Exposure                          Period 1
* Updated                various                HEPs due            to  credit for ~2    hour              2B  AF    pump                    demonstrated                      run                time during Exposure                          Period 1.      Refer to Appendix            A  for additional details.
* Updated                  various                HEPs due            to  applying          a              10%  probability that operators          fail to    manually                                      trip the unit within 30  seconds                        of a            total loss of Main          Feedwater,        as          opposed                        to  allowing      the unit to automatically                          trip on                        low        SG    level.
o                                          Applied to    both          the base                  case                  and                        Exposure                          Period 2
 
4 BW-SDP-006,                              Rev.      0
 
o                                    Refer to  Appendix                    A  for additional      details 2.2    FPRA The    major                model            refinements      made                        to  the FPRA      model            are        as        follows:
* Scenarios                    where          no                  reactor          trip was                  anticipated,      for U1                    (relative to  the availability of the U1                  cross tie to  support          U2)                and                      for U2                  received a          conservative                        0.1      unit trip probability.
* 11.4C-0        Rad            Waste                Control          Room                                  fire modeling                refinements,    specifically the size and                    spread        of fires in  this zone                    and                    how                  they      impact        the Unit          1 cables                      in the zone
* MH    FLEX        pump                    credit to  supply flow                                                                                                              to  SGs  from        the Refueling Water            Storage            Tank                    (RWST),
including        credit to  the N+1      FLEX        pump                    after 4  successful                hours              of the first FLEX        pump.
* Updated                    various                HEPs    due            to  credit from          ~2    hour              2B  AF    pump                    demonstrated                              run              time during Exposure                            Period 1.      Refer to  Appendix                  A  for additional      details.
* Updated                    various                HEPs    due            to  applying                a          10%    probability          that operators                fail to    manually                                        trip the unit within 30  seconds                            of a            total loss of Main            Feedwater,              as        opposed                        to  allowing            the unit to automatically trip                                                                                                                                                                                on                    low        SG    level.
o                                  Applied to    both            the base                  case                and                      Exposure                            Period 2 o                                    Refer to Appendix                    A  for additional    details.
3.0      Results Table                3.0-1      below                  shows                the results of Braidwood's                            FPIE    and                    FPRA      models            following    the refinements discussed            in  Section            2. These      models          were      quantified with average                    maintenance and                                                                                                                                                                                                                          with the 2B  AF pump                        Fail to    Run                    event      set to  TRUE.                    The    exposure                              period is split up            into  2  different periods:  Exposure Period  1  is the time before          September                  1 and                      Exposure                              Period 2    is the time after September                    1. There  are different PRA    results before          and                    after September                  1  because                                    the 2B  AF    pump                        ran              for approximately                                  2 hours                on                    September                    1.      Exposure                              Period  1 credits this proven                      run                time while Exposure                              Period 2  does              not.
 
Table              3.0-1:      SOP    Results End                                                                                                                                    FPIE                                                                                                                          FPRA                                                                                                                              FPIE                                                                                                                      FPRA                                                                            Exposure                                                                                                                      Total State                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Delta                                                                                                                            Delta                                                                                                    Time (Days)
Base                                                                                                                                                                  CDF                                                                                                      7.1 E-06                                                                          2.7E-05                                                                                                            N/A                                                                                                                                N/A                                                                                                                                  N/A                                                                                                                                  N/A Case                                                                                                                                                      LERF                                                                            1.2E-07                                                                                3.3E-06                                                                                                                N/A                                                                                                                                    N/A                                                                                                                                N/A                                                                                                                                        N/A
 
Exposure                                                                                                          CDF                                                                                1.6E-05                                                                                3.7E-05                                                                                8.5E-06                                                                                  1.0E-05                                                                                                              105                                                                                                        5.4E-06 Period      1                                                                                LERF                                                                          3.6E-07                                                                              4.4E-06                                                                              2.5E-07                                                                                                        1.1 E-06                                                                                                            105                                                                                                          3.9E-07
 
Exposure                                                                                                            CDF                                                                                  1.9E-05                                                                              5.6E-05                                                                                  1.2E-05                                                                            2.9E-05                                                                                                                22                                                                                                              2.5E-06 Period    2                                                                                  LERF                                                                        4.6E-07                                                                                6.5E-06                                                                                3.4E-07                                                                                3.2E-06                                                                                                                22                                                                                                                                              2.1 E-07
 
Total                                                                                                                                                          CDF                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  127                                                                                                        7.9E-06 Exposure                                                                                                  LERF                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                127                                                                                                        6.0E-07 Period
 
4.0    Sensitivities 4.1        FLEX          HEP  Sensitivity After detailed discussions                and                    walkdowns,                                      the NRC      has          challenged            the acceptability          of deploying              the MH FLEX        pump                      to  pull suction                from        the RWST                  to    supply            the SGs. While a          detailed human                                        error probability (HEP)      calculation                        for failing to  deploy              the MH    FLEX        pump                      has          been                      completed,              the challenge              that the NRC      has            presented  is understood.                              Therefore,  the sensitivity increased              the execution                                timing for the HEP calculation.                          These    adjusted      HEPs  were        then      used            to  quantify              the FPIE    and                    FPRA      models            associated                  with Exposure                                Period 1. These      results are      summarized                                    in    Section          4.3.
 
5 BW-SDP-006,                          Rev. 0
 
The  timing used          to  calculate            the probability    that the operators          fail to  align the MH      FLEX      pump                      includes      5 parts:
: 1.                                    The    length of time for operators            to  decide to    use          FLEX      per 2BwFR-H.1                -                      19  minutes
: 2.                                    The    time to  set up            the high head              FLEX        pump                    -                      132  minutes
: 3.                                    The    amount                                      of extra      time required to  establish procedure                steps to  align the MH      FLEX      pump.                          Base case                assumes                                  an                      additional 20    minutes          for this part of                                                                        the action                    and                      this is included        in the execution time.
: 4.                                  The    additional  time required to  set up          the MH    FLEX      pump                    discharge    hoses        -                23  minutes
: 5.                                    The    amount                                      of time required to  depressurize the SG  that will be              fed with the MH      FLEX      pump                      -                    20 minutes
 
Interval 1 -            Before Operations      decides to    use          FLEX,        they    must rule                                                                              out            the use        of the AF  crosstie. This, along                  with making                  the decision    to    use            FLEX,      was                  simulated by                      the Operations      day                      shift on                      12/10/23    and was                  determined  to    be              19  minutes.        This time is included        in  Tcielay  depicted in  Table            4.1-1    as          a          20    minute value.
 
Intervals 2-4  cover            the MH      FLEX      pump                      alignment.            The    reason                      the high head            FLEX      pump                    execution timing is used              in  Interval 1 is because                                  that action                was                  validated as          part of the ELAP    FLEX      strategy.
OP-BR-102-106                Rev    015  reports this timing under                FTSA#8    as            132  minutes.          This timing reflects the high head            FLEX        pump                        pulling suction                from      the RWST.                  Interval 3  reflects the extra      time required to  establish procedure                    steps to  align the MH    FLEX pump                                                                                                                                        to  the RWST.                Sensitivity to  this assumption                                  is explored          in Table          4.1-1.        Finally, when                      aligning the MH    FLEX      pump                        to    pull suction                from      the RWST,                  additional discharge    hose          staging  is required for the pump                    to  discharge  into the SGs. Therefore, an                      additional  23 minutes              is included        as          Interval 4. This time was                  simulated by                    the day                      shift on                        12/10/23.
 
Interval 5  -          The    length of time to  depressurize the SGs  sufficiently such                that the MH    FLEX        pump                        can inject flow                                                                                                            is accounted                                          for and                    takes 20    minutes.
 
Table              4.1-1:        Differing Additional        Time    Applied Due              to      Procedural                              Complexity                            and                            AF    Pump                                Run Times,    with Resulting    Action                  Timing            and                          HEPs In                            ut      Parameters                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              HEP Values Case                                                                                                                                                                                                    Available          Times                                                                                                                                                                                          Time      Required        to      Establish Procedure                            Steps to Ali n            Medium                    Head              FLEX          Pum AFW                                                                                                                  Tsw                                                              Tdelay                                                                              Tsw-                                                                                                                                                                      20    Min                                                                                                          30    Min                                                                                                            40    Min                                                                                                                                                        50    Min Pump                            Run                                                                          (Min)                                                            (Min)                                                                                      Tdelay Time                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Min 1.88  Hours                                                                                                  350                                                                                                                  132                                                                                                                                      218                                                                                                                                  6.3E-02 2.0    Hours                                                                                                                                365                                                                                                                  140                                                                                                                                            225                                                                                                                                6.3E-02 3.0  Hours                                                                                                              440                                                                                                      200                                                                                                                                              240                                                                                                                                    4.7E-02 4.0    Hours                                                                                                                                520                                                                                                      260                                                                                                                                              260                                                                                                                                        3.9E-02                                                                                                                                                                                                                                                                                            4.?E-02
*Tree=  0;    2.2E-1      is the HEP  value          with no                    recovery.                  Tree=  0 if Tsw      is 365  minutes        and                      an                  additional 50  minutes        are used          to  determine the alignment      procedure                  implementation            steps. Note    that the MAAP  runs            quoted              in    Table        4.1-3 indicate Tsw      for 2.0  hours          of AF run                time could                be            as        large as        370 minutes          and                      Tsw      for 3.0  hours          of AF run                time could                be          as        high as        445  minutes.              The    Tsw      values        quoted              in  Table          4. 1-1    are      slightly conservative.
 
The  sensitivity in  Table          4.1-1    adds          additional  time for the assumed                              extra        time needed              to  establish procedure                    steps to  align the MH    FLEX pump                                                                                                                                and                      shows                  the change                                      in    HEP  when                    the recovery                  time is reduced.              The    HEP  naturally              increases          as          execution                            time increases          because                                    the recovery                  time is shorter, which      increases the                                                                                                                                                    dependency                                          factor. The    HEPs  based                      on                      recovery                    time available        and                      associated dependency                                          factor    are      summarized                            in  Table            4.1-2.
 
6 BW-SDP-006,                          Rev.        0
 
Table            4.1-2:        HEP  Based                on                            Recovery                              Time    Available          and                        Associated                      Dependency                                                Factor
 
Tree (min)                                                                                                                                                                                                                                                                                                                                            Dependency                                                    Factor                                                                                                                                                                                                                                                          FLEX      HEP
                                                                                                          >  60                                                                                                                                                                                                                                                                                                                                                                                Zero            Dependence                                                                                                                                                                                                                                                                                                    3.9E-02
                                                                      >  30  and                        up            to  60                                                                                                                                                                                                                                                                                              Low                  Dependence                                                                                                                                                                                                                                                                                                      4.7E-02
                                                                      >      15  and                        up            to    30                                                                                                                                                                                                                                                    Medium              Dependence                                                                                                                                                                                                                                                                      6.3E-02
                                                                        >    0  and                        up              to    15                                                                                                                                                                                                                                                                                                                  High Dependence                                                                                                                                                                                                                                                                                                                          1.2E-01 0                                                                                                                                                                                                                                                                                                                                                      Complete        Dependence                                                                                                                                                                                                                                                                              2.2E-01 NeQative                                                                                                                                                                                                                                                                                                                                                                                                                                                      N/A                                                                                                                                                                                                                                                                                                                                                                                                                                                      1.0
 
Table            4.1-1      also        varies the amount                                    of time the 28  AF    pump                        ran.                    By            increasing            this run                time, the core            will produce                          less decay                              heat  when                    the 28  AF    pump                      fails to    run.                This lengthens    the time to  core            damage,                                      and thus  lengthens    the system          window                          time as          well as        the time available            to  deploy              the MH    FLEX        pump.
Additional recovery                    time yields lower    dependence                                  and                      lower    HEPs. System            window                          times are      determined by                    the thermal hydraulic              analysis                      in  Table          4.1-3,      which          uses        MAAP.
 
Table              4.1-3:      MAAP    Quantifications                    Corresponding                                        to        Differing AF      Pump                              Run                            Time
 
Case                                                                                                                                                                                                  BB_506_OSG                -                                                                                                                  BB_506_OSG                  -                                                                                                                  BB_506_OSG                -                                                                                                                  BB_506_OSG                -
DD188              FLEX1                                                                                                                  DD200                FLEX1                                                                                                                            DD300            FLEX1                                                                                                                      DD400              FLEX1 DDAFW                                                                                                                                                                                    1.88    hours                                                                                                                                                                                                                          2    hours                                                                                                                                                                                                                                                        3  hours                                                                                                                                                                                                                                                      4    hours operation time SG    dryout                                                                                                                                                              241.4      min                                                                                                                                                                                                        250.1        min                                                                                                                                                                                                        321.3    min                                                                                                                                                                                                                    390.1      min
 
Core                                                                                                                                                                                                                                      309.6      min                                                                                                                                                                                        318.3      min                                                                                                                                                                                                                                396.1      min                                                                                                                                                                                      466.9      min uncovery FLEX      start                                                                                                                            349.6      min                                                                                                                                                                                                                  370      min                                                                                                                                                                                                                            445    min                                                                                                                                                                                                                                  520    min time Peak          core                                                                                                                                                                                                                1211    °F                                                                                                                                                                                                        1306    °F                                                                                                                                                                                                                              1255  °F                                                                                                                                                                                                                      1243    °F temperature
 
The    total system            window,                                    Tsw,        corresponds                          to  the FLEX        start time needed                to  avoid          core            damage.                                  Delay time, Tdelay,          is the 28  AF    pump                        run              time plus the time it takes operators                to    decide to    use          FLEX.        The difference between                            Tsw      and                          Tdelay        is the total amount                                      of time available          for operators                to  complete              an                      action, or    Time    Required,  Tr. The    difference between                      total available          time and                      the time required to  execute                          is Tree, or    amount                                      of time available            for recovery.                    Figure 4.1-1        illustrates the timing definitions.
 
7 BW-SDP-006,                                Rev.        0
 
I System            Window,                                      T~w
                                                                                                                                                                    ! Time    Required,        TR
 
L R~o~ry                      time, ~]I Expected                Performance                                  Time, ET I                                                                                                                                                                                                                                                                                                                                *'                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          i
 
          ---------.....,                                1.-I ..    ----------.-                              .... -.**f----------....... -                  ... ,-                  time
 
t\\:c O                                                                                                                                                                                                                                                                                                                                ~\\_[~--------
Qpef.1',l,)!f' is cl.HHJ to perform action
 
                              \\ _________                                                        ,----1 -~
loitiatin~ Event Occurs                                                                                                                                                                                                                                                                          lrre(:ovenble eod              state
 
Figure  4.1-1    Timing          Criteria
 
Credit for the ~2    hour              2B  AF    pump                          run              time provides  enough                                  margin                    to    credit the MH    FLEX        pump deployment.                              Additionally,    earlier in  the total exposure                              period,  the 2B  AF    pump                    demonstrated                          at  least 3.5 hours                of run                time, incrementally                    decreasing                  as          monthly                      test runs              were      completed.                  Table            4.1-4      shows                  this demonstrated                                run                time.
 
Table                4.1-4:    28  AF      Pump                            Demonstrated                                  Runtime Date                                                                                                                                                                                                                                                                  Run                          Time      (Hours) 6/8/2023                                                                                                                                                                                                                                                                                                                                              0.61 7/14/2023                                                                                                                                                                                                                                                                                        0.57 8/10/2023                                                                                                                                                                                                                                                                                                  0.52 9/1/2023                                                                                                                                                                                                                                                                                                      1.88 Total                                                                                                                                                                                                                                                                                                                    3.58
 
Along              with the greater than              24    hour                  run              time from        the Detroit Diesel test, the 2B  AF    pump                        run                times currently              credited in  the analysis                    are        bounding.                                        Credit for additional          run              time could                  substantially                  influence the assumed                              boundary                                                      conditions                              in  this analysis.
 
On              12/10/23,        the day                    shift on                    Braidwood                            Unit        2  walked            through                a          simulated        operator                response                  of what they      would                    do          after the 2B  AF    pump                      tripped after a          unit  trip, and                    the 2A AF    pump,                        FW          restoration,          and                    the AF  crosstie were        all unavailable.                                  They              recognized                  the need              to    restore SG  feed in  time to    prevent    core damage                                would                      be          the major              objective      and                  the MH    FLEX        pump                      pulling suction                  from        the RWST                would                    be faster than            the using            the low        head              FLEX        pump                      pulling suction                  from          the lake  to    supply            the MH    FLEX pump.                        The    crew            identified they      would                      use          the MH    FLEX        pump                      but            noted              concerns                                      due            to    supplying              the SGs with contaminated                                            RWST                water.          They              recognized                  the Shift Manager                          would                    have              implemented                1 O CFR      50.54(x)                which          allows          Operations              to    make                    decisions          outside      of procedures                                in  order    to    protect the health and                    safety      of the public.          One            identified strategy    was                  to  supply            the MH    FLEX        pump                    via  the fire protection            system,                if it were        available,                which        would                        be          substantially                  quicker    than              connecting                                      the FLEX pump                      to  the RWST                and                  would                    alleviate contamination                                                  concerns.                                        This would                    also          alleviate the need              to connect                                    the 3400'        of 5"    hose            required to  connect                                  the low        head              FLEX        pump                      drafting off of the cooling                  lake to  supply              the MH    FLEX        pump,                        should            this suction                  supply            option                be          selected as        described              in  the
 
8 BW-SDP-006,                        Rev. 0
 
procedure.                    However,                the crew          would                    pursue              alternate success                  paths  in    parallel provided the operator resources            were      available.
 
The  operations                crews        are      made                          up          of highly trained individuals dedicated to    protecting the health and safety of the public. If the crew          lost AF,    FW            restoration, and                      the AF  crosstie, they  would                  not          stop attempting alternative strategies to    restore secondary                                            cooling.              While these additional operator          actions were      not          quantified in  the FPIE  and                      FPRA      models,        these operator          actions                should          be          qualitatively considered              in tandem                      with the modeled            operator          actions.
 
The  discussion            above                              demonstrates                a            realistic pathway                              towards            cooling              the core              in  the understood scenario.                  Operations      has          stated that by                      implementing 10 CFR    50.54(x),              they  would                  implement  non proceduralized    actions                to    protect the health and                      safety  of the public.      This includes  different suction sources                for the MH      FLEX      pump,                        like the Fire Protection  header.      While the implementation        of  10  CFR 50.54(x)            does            introduce          some                      level of unpredictability in  operator            response,              operators          are      trained to  cool the core              in  any                              way                                possible. While  they may                                  not          take the exact                  actions                discussed    in  the HEP development              above,                                  they  would                  take  action.                  The    purpose            of this HEP  sensitivity is to    bound                                        this uncertainty.                      The  sensitivity results, included        in  Section        4.3,  considers        3  HEPs for the MH    FLEX      pump HFE:  0.063    (nominal                          or      medium                    dependence,                                  as          shown                                  in Table          4.1-2),      0.3,    and                            1.0 (no                      flex credit).
 
4.2  28  AF      Pump                                  Failure Probability                        Sensitivity The  example                      Detroit Diesel testing report shows              that the 2B  AF    pump                    would                    have            met  its PRA    mission time and                    would                      have            been                      considered            available        for the duration            of the SOP  exposure                          period. However, an                      additional sensitivity, modifying    the 2B  AF    pump                      failure rate, is included        to  address    any                                proposed uncertainty                        regarding the Detroit Diesel engine            testing. The  results of this sensitivity are      included        in Tables        4.3-1    through        4.3-6.
 
4.3    Sensitivity Results The  tables  below                  contain                          the results of several sensitivity studies. The    FLEX        HEP  described  in  Section 4.1        is varied from        its nominal                          value          of 0.063  to    0.3  to    1.0 (True).      Additionally, the 2B  AF    pump                        FTR    value is varied from        0.1      to  0.5  to      1.0 (True).        Tables          4.3-1    and                      4.3-2  show                  the ~CDF        and                  ~LERF          values        for the FPIE  model          sensitivity results, respectively. Similarly, Tables        4.3-3    and                      4.3-4    show                  the ~CDF        and                  ~LERF values        for the FPRA    model          sensitivity results, respectively. Finally, the FPIE    and                      FPRA    results are combined                                            in  Tables          4.3-5  and                    4.3-6  for ~CDF        and                  ~LERF,            respectively.
 
Due            to  the Detroit Diesel test running                      for greater than              24  hours,              the pump                            is assumed                            to    run                for at  least 2 hours            for the duration              of the exposure                            period. Therefore, the values            in  these tables use        the Exposure Period 1 refinements for the entire 127-day                      duration.                This is different from        the SOP  calculation                        in  Table 3.0-1,  which        uses        the Exposure                          Period 2  base                  over      the entire exposure                            period. The  base                    from        Exposure Period 1 was                    used          because                                      it credits the MH    FLEX      pump                      strategy and                      the demonstrated                  2B  AF pump/engine                                      run                  time. This yields a          lower  base                    metric and                      therefore larger and                        more              conservative difference between                        the base                    and                      sensitivity CDF  and                          LERF.
 
Appendix            C  provides  additional detail for the sensitivity calculations.
 
9 BW-SDP-006,                        Rev. 0
 
Table            4.3-1      FPIE  LiCDF Sensitivities FLEX      HEP 0.063                                                                                                                          0.3                                                                                                                                                                    TRUE 2BAF                                                                                                                          0.1                                                                                  2.?E-07                                                                            3.6E-07                                                                                        4.8E-07 Pump                                                                                                                                  0.5                                                                                  1.6E-06                                                                            1.8E-06                                                                                        2.0E-06 Failure                                                                                TRUE Probability                                                                                                                                                                          3.2E-06                                                                            3.5E-06                                                                                        4.0E-06
 
Table            4.3-2      FPIE  LiLERF Sensitivities FLEX        HEP 0.063                                                                                                                            0.3                                                                                                                                                                      TRUE 2BAF                                                                                                                              0.1                                                                                  7.?E-09                                                                            9.9E-09                                                                                            1.3E-08 Pump                                                                                                                                      0.5                                                                            4.6E-08                                                                                5.1E-08                                                                                            5.8E-08 Failure                                                                                  TRUE Probability                                                                                                                                                                            9.3E-08                                                                                1.0E-07                                                                                                                1.1 E-07
 
Table            4.3-3      FIRE    LiCDF Sensitivities FLEX        HEP 0.063                                                                                                                              0.3                                                                                                                                                                      TRUE 2BAF                                                                                                                          0.1                                                                                  4.2E-07                                                                                  7.3E-07                                                                                              1.3E-06 Pump                                                                                                                              0.5                                                                                2.2E-06                                                                                3.3E-06                                                                                          5.2E-06 Failure                                                                              TRUE Probability                                                                                                                                                                      4.0E-06                                                                                  6.2E-06                                                                                          9.6E-06


Table          4.3-4      FIRE    b.LERF                Sensitivities FLEX        HEP 0.063                                                                                                                              0.3                                                                                                                                                                      TRUE 2BAF                                                                                                                          0.1                                                                                  4.5E-08                                                                                7.3E-08                                                                                              1.3E-07 Pump                                                                                                                                   0.5                                                                              2.3E-07                                                                                  3.2E-07                                                                                            5.0E-07 Failure                                                                              TRUE Probability                                                                                                                                                                      4.3E-07                                                                                6.3E-07                                                                                            9.3E-07
BW-SDP-006, Rev. 0 1.0 Event Overview Elevated fuel content was identified in the 2B Auxiliary Feedwater (AF) diesel engine lube oil sample during quarterly sampling. A confirmatory sample determined the fuel content was above fault limits and could not be evaluated to be acceptable. An emergent 72-hour LCO entry was made to perform repairs which found fuel leaks at compression fittings on 2 fuel injector return lines and exited on 9/23/2023. The fuel lines and fittings were originally replaced during preventative maintenance during A2R23 (spring 2023). The last previous in-range oil sample was taken on 5/19/2023. Fuel leaks were identified on fuel injectors that had been refurbished at Paragon, Inc. The 16 units were returned to stock at Byron Station on March 27, 2023, PO 1390618 was issued to Paragon March 29, 2023, and repair units were received back onsite at Braidwood Station from Paragon on April 17, 2023. Material condition deficiencies with refurbished fuel injectors, including fuel injector cap sealing surface defects and degraded O-ring, resulted in diesel fuel leaking into the diesel engine oil.
Testing was performed on a Detroit Diesel Series 149 diesel engine to determine if the 2B AF diesel engine could have performed its safety function of driving the 2B AF pump and other connected equipment for a period of at least 24 hours. The engine started with fuel oil diluted lubricating oil representative of the 2B AF engine conditions and operated in this condition for over 24 hours, with additional fuel oil being added to the lube oil during the test to represent the September 2023 as-found condition. Based on the successful performance of the test engine with the fuel oil diluted lube oil and MPR's evaluation determining the test addressed all of the likely engine failure modes, MPR concluded that there is reasonable assurance the Braidwood 2B AF Pump Diesel Drive would have performed its safety function of driving the 2B AF pump and other connected equipment for at least 24 hours [1]
Based on this testing, the 2B AF pump would have met its PRA success criteria and PRA mission time.
Therefore, the 2B AF pump would be considered available for the duration of the SOP exposure period.
Following IMC 0609 Appendix A Exhibit 2, the 2B AF pump would have maintained its PRA functionality and would screen as Green [2]. The following PRA model refinements, results, and sensitivities are provided under the assumption that the pump would not have met its mission time, in the event the NRC does not agree that PRA success criteria and PRA mission time are met.
2.0 Major PRA Model Refinements for the SDP 2.1 FPIE The major model refinements made to the FPIE model are as follows:
Refined support system initiating event (SSIE) fault trees to improve quantification times Included loss of ESF AC bus initiators as general transients o
Controlled shutdown following loss of ESF AC bus would not need to recognize loss of secondary cooling as FW is available during shutdown.
Incorporated more credit to the DC crosstie to opposite unit DC bus, specifically adding credit for DC crosstie (train A; train B already credited) within 1 hour of associated battery charger not being energized.
o Credited the DC bus 111 to 211 DC crosstie (for controlled shutdown following loss of ESF AC bus initiating events only).
Medium Head (MH) FLEX pump credit to supply flow to Steam Generators (SGs) from the RWST, including credit to the N+1 FLEX pump after 4 successful hours of the first FLEX pump.
Updated loss of AC power recovery values for SOP Exposure Period 1 due to credit from ~2 hour 2B AF pump demonstrated run time during Exposure Period 1 Updated various HEPs due to credit for ~2 hour 2B AF pump demonstrated run time during Exposure Period 1. Refer to Appendix A for additional details.
Updated various HEPs due to applying a 10% probability that operators fail to manually trip the unit within 30 seconds of a total loss of Main Feedwater, as opposed to allowing the unit to automatically trip on low SG level.
o Applied to both the base case and Exposure Period 2 4


10 BW-SDP-006,                         Rev. 0
BW-SDP-006, Rev. 0 o
Refer to Appendix A for additional details 2.2 FPRA The major model refinements made to the FPRA model are as follows:
Scenarios where no reactor trip was anticipated, for U1 (relative to the availability of the U1 cross-tie to support U2) and for U2 received a conservative 0.1 unit trip probability.
11.4C-0 Rad Waste Control Room fire modeling refinements, specifically the size and spread of fires in this zone and how they impact the Unit 1 cables in the zone MH FLEX pump credit to supply flow to SGs from the Refueling Water Storage Tank (RWST),
including credit to the N+1 FLEX pump after 4 successful hours of the first FLEX pump.
Updated various HEPs due to credit from ~2 hour 2B AF pump demonstrated run time during Exposure Period 1. Refer to Appendix A for additional details.
Updated various HEPs due to applying a 10% probability that operators fail to manually trip the unit within 30 seconds of a total loss of Main Feedwater, as opposed to allowing the unit to automatically trip on low SG level.
o Applied to both the base case and Exposure Period 2 o
Refer to Appendix A for additional details.
3.0 Results Table 3.0-1 below shows the results of Braidwood's FPIE and FPRA models following the refinements discussed in Section 2. These models were quantified with average maintenance and with the 2B AF pump Fail to Run event set to TRUE. The exposure period is split up into 2 different periods: Exposure Period 1 is the time before September 1 and Exposure Period 2 is the time after September 1. There are different PRA results before and after September 1 because the 2B AF pump ran for approximately 2 hours on September 1. Exposure Period 1 credits this proven run time while Exposure Period 2 does not.
Table 3.0-1: SOP Results End FPIE FPRA FPIE FPRA Exposure Total State Delta Delta Time (Days)
Base CDF 7.1 E-06 2.7E-05 N/A N/A N/A N/A Case LERF 1.2E-07 3.3E-06 N/A N/A N/A N/A Exposure CDF 1.6E-05 3.7E-05 8.5E-06 1.0E-05 105 5.4E-06 Period 1 LERF 3.6E-07 4.4E-06 2.5E-07 1.1 E-06 105 3.9E-07 Exposure CDF 1.9E-05 5.6E-05 1.2E-05 2.9E-05 22 2.5E-06 Period 2 LERF 4.6E-07 6.5E-06 3.4E-07 3.2E-06 22 2.1 E-07 Total CDF 127 7.9E-06 Exposure LERF 127 6.0E-07 Period 4.0 Sensitivities 4.1 FLEX HEP Sensitivity After detailed discussions and walkdowns, the NRC has challenged the acceptability of deploying the MH FLEX pump to pull suction from the RWST to supply the SGs. While a detailed human error probability (HEP) calculation for failing to deploy the MH FLEX pump has been completed, the challenge that the NRC has presented is understood. Therefore, the sensitivity increased the execution timing for the HEP calculation. These adjusted HEPs were then used to quantify the FPIE and FPRA models associated with Exposure Period 1. These results are summarized in Section 4.3.
5


Table            4.3-5   TOTAL    LiCDF Sensitivities FLEX         HEP 0.063                                                                                                    0.3                                                                                                                                                                          TRUE 28AF                                                                                                                                0.1                                                                                               6.9E-07                                                                              1.1 E-06                                                                                                  1.SE-06 Pump                                                                                                                                       0.5                                                                                              3.?E-06                                                              5.0E-06                                                                                              7.2E-06 Failure                                                                                  TRUE Probability                                                                                                                                                                                          7.2E-06                                                              9.?E-06                                                                                              1.4E-05
BW-SDP-006, Rev. 0 The timing used to calculate the probability that the operators fail to align the MH FLEX pump includes 5 parts:
: 1.
The length of time for operators to decide to use FLEX per 2BwFR-H.1 - 19 minutes
: 2.
The time to set up the high head FLEX pump - 132 minutes
: 3.
The amount of extra time required to establish procedure steps to align the MH FLEX pump. Base case assumes an additional 20 minutes for this part of the action and this is included in the execution time.
: 4.
The additional time required to set up the MH FLEX pump discharge hoses - 23 minutes
: 5.
The amount of time required to depressurize the SG that will be fed with the MH FLEX pump - 20 minutes Interval 1 - Before Operations decides to use FLEX, they must rule out the use of the AF crosstie. This, along with making the decision to use FLEX, was simulated by the Operations day shift on 12/10/23 and was determined to be 19 minutes. This time is included in Tcielay depicted in Table 4.1-1 as a 20 minute value.
Intervals 2-4 cover the MH FLEX pump alignment. The reason the high head FLEX pump execution timing is used in Interval 1 is because that action was validated as part of the ELAP FLEX strategy.
OP-BR-102-106 Rev 015 reports this timing under FTSA#8 as 132 minutes. This timing reflects the high head FLEX pump pulling suction from the RWST. Interval 3 reflects the extra time required to establish procedure steps to align the MH FLEX pump to the RWST. Sensitivity to this assumption is explored in Table 4.1-1. Finally, when aligning the MH FLEX pump to pull suction from the RWST, additional discharge hose staging is required for the pump to discharge into the SGs. Therefore, an additional 23 minutes is included as Interval 4. This time was simulated by the day shift on 12/10/23.
Interval 5 - The length of time to depressurize the SGs sufficiently such that the MH FLEX pump can inject flow is accounted for and takes 20 minutes.
Table 4.1-1: Differing Additional Time Applied Due to Procedural Complexity and AF Pump Run Times, with Resulting Action Timing and HEPs In ut Parameters HEP Values Case Available Times Time Required to Establish Procedure Steps to Ali n Medium Head FLEX Pum AFW Tsw Tdelay Tsw-20 Min 30 Min 40 Min 50 Min Pump Run (Min)
(Min)
Tdelay Time Min 1.88 Hours 350 132 218 6.3E-02 2.0 Hours 365 140 225 6.3E-02 3.0 Hours 440 200 240 4.7E-02 4.0 Hours 520 260 260 3.9E-02 4.?E-02
*Tree= 0; 2.2E-1 is the HEP value with no recovery. Tree= 0 if Tsw is 365 minutes and an additional 50 minutes are used to determine the alignment procedure implementation steps. Note that the MAAP runs quoted in Table 4.1-3 indicate Tsw for 2.0 hours of AF run time could be as large as 370 minutes and Tsw for 3.0 hours of AF run time could be as high as 445 minutes. The Tsw values quoted in Table 4. 1-1 are slightly conservative.
The sensitivity in Table 4.1-1 adds additional time for the assumed extra time needed to establish procedure steps to align the MH FLEX pump and shows the change in HEP when the recovery time is reduced. The HEP naturally increases as execution time increases because the recovery time is shorter, which increases the dependency factor. The HEPs based on recovery time available and associated dependency factor are summarized in Table 4.1-2.
6


Table           4.3-6     TOTAL  LiLERF Sensitivities FLEX        HEP 0.063                                                                                                  0.3                                                                                                                                                                            TRUE 28AF                                                                                                                                0.1                                                                                                 5.3E-08                                                              8.3E-08                                                                                                1.5E-07 Pump                                                                                                                                       0.5                                                                                              2.?E-07                                                            3.?E-07                                                                                              5.6E-07 Failure                                                                                  TRUE Probability                                                                                                                                                                                            5.3E-07                                                              7.3E-07                                                                                                1.0E-06
BW-SDP-006, Rev. 0 Table 4.1-2: HEP Based on Recovery Time Available and Associated Dependency Factor Tree (min)
Dependency Factor FLEX HEP
> 60 Zero Dependence 3.9E-02
> 30 and up to 60 Low Dependence 4.7E-02
> 15 and up to 30 Medium Dependence 6.3E-02
> 0 and up to 15 High Dependence 1.2E-01 0
Complete Dependence 2.2E-01 NeQative N/A 1.0 Table 4.1-1 also varies the amount of time the 28 AF pump ran. By increasing this run time, the core will produce less decay heat when the 28 AF pump fails to run. This lengthens the time to core damage, and thus lengthens the system window time as well as the time available to deploy the MH FLEX pump.
Additional recovery time yields lower dependence and lower HEPs. System window times are determined by the thermal hydraulic analysis in Table 4.1-3, which uses MAAP.
Table 4.1-3: MAAP Quantifications Corresponding to Differing AF Pump Run Time Case BB_506_OSG -
BB_506_OSG -
BB_506_OSG -
BB_506_OSG -
DD188 FLEX1 DD200 FLEX1 DD300 FLEX1 DD400 FLEX1 DDAFW 1.88 hours 2 hours 3 hours 4 hours operation time SG dryout 241.4 min 250.1 min 321.3 min 390.1 min Core 309.6 min 318.3 min 396.1 min 466.9 min uncovery FLEX start 349.6 min 370 min 445 min 520 min time Peak core 1211 °F 1306 °F 1255 °F 1243 °F temperature The total system window, Tsw, corresponds to the FLEX start time needed to avoid core damage. Delay time, Tdelay, is the 28 AF pump run time plus the time it takes operators to decide to use FLEX. The difference between Tsw and Tdelay is the total amount of time available for operators to complete an action, or Time Required, Tr. The difference between total available time and the time required to execute is Tree, or amount of time available for recovery. Figure 4.1-1 illustrates the timing definitions.
7


4.4    Impact                                from                    External                  Events The    NRC    provided 3 tiCDF data              points for their external,      high winds      and                      seismic contributions                      to   the SDP determination:          9.5E-7,   6.5E-7,     and                        5E-7. These values          are        highlighted in  Table         4.4-1. 9.5E-7      is the base case,                   and                        then    the NRC      provided a          sensitivity with the FLEX        HEP  set to    0.063  and                        0.5  for the 2B AF pump                         FTR    value.               In              lieu of trying to   reproduce                the modifications    that were    made                        to   the SPAR      model,            an extrapolation                      is performed. The   first step was                   to extrapolate        to   the   top right value            first. Then,            the other values          are      derived after assigning      their FLEX     sensitivity to   the bottom                      left as           an                    anchor                                    point.
BW-SDP-006, Rev. 0 I System Window, T~w
! Time Required, TR L R~o~ry time, ~]I Expected Performance Time, ET I
i I
---------.....,1.-
.... -.**f----------....... -...
,- time t\\:c O
~\\_[~--------
Qpef.1',l,)!f' is cl.HHJ to perform action
\\ _________,----1 -~
loitiatin~ Event Occurs lrre(:ovenble eod state Figure 4.1-1 Timing Criteria Credit for the ~2 hour 2B AF pump run time provides enough margin to credit the MH FLEX pump deployment. Additionally, earlier in the total exposure period, the 2B AF pump demonstrated at least 3.5 hours of run time, incrementally decreasing as monthly test runs were completed. Table 4.1-4 shows this demonstrated run time.
Table 4.1-4: 28 AF Pump Demonstrated Runtime Date Run Time (Hours) 6/8/2023 0.61 7/14/2023 0.57 8/10/2023 0.52 9/1/2023 1.88 Total 3.58 Along with the greater than 24 hour run time from the Detroit Diesel test, the 2B AF pump run times currently credited in the analysis are bounding. Credit for additional run time could substantially influence the assumed boundary conditions in this analysis.
On 12/10/23, the day shift on Braidwood Unit 2 walked through a simulated operator response of what they would do after the 2B AF pump tripped after a unit trip, and the 2A AF pump, FW restoration, and the AF crosstie were all unavailable. They recognized the need to restore SG feed in time to prevent core damage would be the major objective and the MH FLEX pump pulling suction from the RWST would be faster than the using the low head FLEX pump pulling suction from the lake to supply the MH FLEX pump. The crew identified they would use the MH FLEX pump but noted concerns due to supplying the SGs with contaminated RWST water. They recognized the Shift Manager would have implemented 1 O CFR 50.54(x) which allows Operations to make decisions outside of procedures in order to protect the health and safety of the public. One identified strategy was to supply the MH FLEX pump via the fire protection system, if it were available, which would be substantially quicker than connecting the FLEX pump to the RWST and would alleviate contamination concerns. This would also alleviate the need to connect the 3400' of 5" hose required to connect the low head FLEX pump drafting off of the cooling lake to supply the MH FLEX pump, should this suction supply option be selected as described in the 8


T                bl                      4 4       1 LiCDF a                      e                                                                          -                                                                                                                                                                                                     ue                        o                                        eIsmIc,                                                     IQ                                                                      In                            s,     an           dT                                                                          d d                                            t                        S  .                                         .                                   H.               h w*          d orna                                      oes FLEX         HEP 0.063                                                                                                       0.3                                                                                                                                                       TRUE 28 AF   Pump                                                                                                                                                                      0.1                                                                                               2.2E-07                                                                2.?E-07                                                                                          4.1 E-07 Failure Probability                                  0.5                                                                                            3.4E-07                                                                4.3E-07                                                                            6.5E-07 TRUE                                                              5.0E-07                                                                6.3E-07                                                                            9.5E-07
BW-SDP-006, Rev. 0 procedure. However, the crew would pursue alternate success paths in parallel provided the operator resources were available.
The operations crews are made up of highly trained individuals dedicated to protecting the health and safety of the public. If the crew lost AF, FW restoration, and the AF crosstie, they would not stop attempting alternative strategies to restore secondary cooling. While these additional operator actions were not quantified in the FPIE and FPRA models, these operator actions should be qualitatively considered in tandem with the modeled operator actions.
The discussion above demonstrates a realistic pathway towards cooling the core in the understood scenario. Operations has stated that by implementing 10 CFR 50.54(x), they would implement non-proceduralized actions to protect the health and safety of the public. This includes different suction sources for the MH FLEX pump, like the Fire Protection header. While the implementation of 10 CFR 50.54(x) does introduce some level of unpredictability in operator response, operators are trained to cool the core in any way possible. While they may not take the exact actions discussed in the HEP development above, they would take action. The purpose of this HEP sensitivity is to bound this uncertainty. The sensitivity results, included in Section 4.3, considers 3 HEPs for the MH FLEX pump HFE: 0.063 (nominal or medium dependence, as shown in Table 4.1-2), 0.3, and 1.0 (no flex credit).
4.2 28 AF Pump Failure Probability Sensitivity The example Detroit Diesel testing report shows that the 2B AF pump would have met its PRA mission time and would have been considered available for the duration of the SOP exposure period. However, an additional sensitivity, modifying the 2B AF pump failure rate, is included to address any proposed uncertainty regarding the Detroit Diesel engine testing. The results of this sensitivity are included in Tables 4.3-1 through 4.3-6.
4.3 Sensitivity Results The tables below contain the results of several sensitivity studies. The FLEX HEP described in Section 4.1 is varied from its nominal value of 0.063 to 0.3 to 1.0 (True). Additionally, the 2B AF pump FTR value is varied from 0.1 to 0.5 to 1.0 (True). Tables 4.3-1 and 4.3-2 show the ~CDF and ~LERF values for the FPIE model sensitivity results, respectively. Similarly, Tables 4.3-3 and 4.3-4 show the ~CDF and ~LERF values for the FPRA model sensitivity results, respectively. Finally, the FPIE and FPRA results are combined in Tables 4.3-5 and 4.3-6 for ~CDF and ~LERF, respectively.
Due to the Detroit Diesel test running for greater than 24 hours, the pump is assumed to run for at least 2 hours for the duration of the exposure period. Therefore, the values in these tables use the Exposure Period 1 refinements for the entire 127-day duration. This is different from the SOP calculation in Table 3.0-1, which uses the Exposure Period 2 base over the entire exposure period. The base from Exposure Period 1 was used because it credits the MH FLEX pump strategy and the demonstrated 2B AF pump/engine run time. This yields a lower base metric and therefore larger and more conservative difference between the base and sensitivity CDF and LERF.
Appendix C provides additional detail for the sensitivity calculations.
9


Adding    these extrapolated        results to  Table         4.3-5     leads to  the following:
BW-SDP-006, Rev. 0 Table 4.3-1 FPIE LiCDF Sensitivities FLEX HEP 0.063 0.3 TRUE 2BAF 0.1 2.?E-07 3.6E-07 4.8E-07 Pump 0.5 1.6E-06 1.8E-06 2.0E-06 Failure TRUE Probability 3.2E-06 3.5E-06 4.0E-06 Table 4.3-2 FPIE LiLERF Sensitivities FLEX HEP 0.063 0.3 TRUE 2BAF 0.1 7.?E-09 9.9E-09 1.3E-08 Pump 0.5 4.6E-08 5.1E-08 5.8E-08 Failure TRUE Probability 9.3E-08 1.0E-07 1.1 E-07 Table 4.3-3 FIRE LiCDF Sensitivities FLEX HEP 0.063 0.3 TRUE 2BAF 0.1 4.2E-07 7.3E-07 1.3E-06 Pump 0.5 2.2E-06 3.3E-06 5.2E-06 Failure TRUE Probability 4.0E-06 6.2E-06 9.6E-06 Table 4.3-4 FIRE b.LERF Sensitivities FLEX HEP 0.063 0.3 TRUE 2BAF 0.1 4.5E-08 7.3E-08 1.3E-07 Pump 0.5 2.3E-07 3.2E-07 5.0E-07 Failure TRUE Probability 4.3E-07 6.3E-07 9.3E-07 10


T                 bl                       4 4     2 T           t   I LiCDF .                             I         d.                                                 S             . a                       e                                                                           -                                              oa                                                                                                                                               , inc     u                           InQ                                   eIsmIc,                                                       IQ                                                                       In                           s,       an H.               hW.                             d                                                                 dT                                                                           d orna                                         oes FLEX       HEP 0.063                                                                                                             0.3                                                                                                                                                                       TRUE 28 AF   Pump                       Failure                                                                                                               0.1                                                                                                                                                                             9.1 E-7                                                                                     1.4E-6                                                                                                           2.2E-6 Probability                                                                                                                                                                                                                                                                                   0.5                                                                                                                                                                       4.1 E-6                                                                                 5.5E-6                                                                                                               7.9E-6 TRUE                                                                                                           7.7E-6                                                                                       1.0E-5                                                                                                                 1.5E-5
BW-SDP-006, Rev. 0 Table 4.3-5 TOTAL LiCDF Sensitivities FLEX HEP 0.063 0.3 TRUE 28AF 0.1 6.9E-07 1.1 E-06 1.SE-06 Pump 0.5 3.?E-06 5.0E-06 7.2E-06 Failure TRUE Probability 7.2E-06 9.?E-06 1.4E-05 Table 4.3-6 TOTAL LiLERF Sensitivities FLEX HEP 0.063 0.3 TRUE 28AF 0.1 5.3E-08 8.3E-08 1.5E-07 Pump 0.5 2.?E-07 3.?E-07 5.6E-07 Failure TRUE Probability 5.3E-07 7.3E-07 1.0E-06 4.4 Impact from External Events The NRC provided 3 tiCDF data points for their external, high winds and seismic contributions to the SDP determination: 9.5E-7, 6.5E-7, and 5E-7. These values are highlighted in Table 4.4-1. 9.5E-7 is the base case, and then the NRC provided a sensitivity with the FLEX HEP set to 0.063 and 0.5 for the 2B AF pump FTR value. In lieu of trying to reproduce the modifications that were made to the SPAR model, an extrapolation is performed. The first step was to extrapolate to the top right value first. Then, the other values are derived after assigning their FLEX sensitivity to the bottom left as an anchor point.
T bl 4 4 1 LiCDF d t S.
H. h w* d a e ue o eIsmIc, IQ In s, an dT d
orna oes FLEX HEP 0.063 0.3 TRUE 28 AF Pump 0.1 2.2E-07 2.?E-07 4.1 E-07 Failure Probability 0.5 3.4E-07 4.3E-07 6.5E-07 TRUE 5.0E-07 6.3E-07 9.5E-07 Adding these extrapolated results to Table 4.3-5 leads to the following:
T bl 4 4 2 T t I LiCDF. I d.
S.
a e oa  
, inc u InQ
: eIsmIc, IQ In s, an H. hW. d dT d
orna oes FLEX HEP 0.063 0.3 TRUE 28 AF Pump Failure 0.1 9.1 E-7 1.4E-6 2.2E-6 Probability 0.5 4.1 E-6 5.5E-6 7.9E-6 TRUE 7.7E-6 1.0E-5 1.5E-5 4.5 Additional Sensitivity An additional sensitivity is included in Table 4.5-1 that shows the LiCDF and LiLERF representing the 2B AF pump FTR probability set to 0.053 (twice the nominal failure probability) and no MH FLEX pump credit. Since there is no MH FLEX pump credit, the Exposure Period 2 base is used in the LiCDF and LiLERF calculations, which is more appropriate for this sensitivity case. Only the case in which FLEX is not credited is performed, because these results bound any case that credits FLEX. The LiCDF for Seismic, High Winds, and Tornadoes uses the same extrapolation methodology described in Section 4.4.
yielding a conservative addition of 3.SE-07 to the total shown in Table 4.5-1.
11


4.5  Additional          Sensitivity An              additional sensitivity is included        in  Table          4.5-1    that shows                  the LiCDF and                     LiLERF representing the 2B AF     pump                        FTR      probability  set to   0.053  (twice the nominal                            failure probability)  and                           no                        MH     FLEX       pump credit. Since      there is no                          MH     FLEX       pump                       credit, the Exposure                            Period 2 base                      is used            in   the LiCDF and LiLERF calculations,                     which      is more                appropriate for this sensitivity case.                Only        the case                    in which      FLEX        is not           credited is performed,   because                                    these results bound                                          any                                case                that credits FLEX.       The LiCDF for Seismic, High Winds,             and                      Tornadoes                                      uses        the same                    extrapolation                methodology                                described  in   Section     4.4.
BW-SDP-006, Rev. 0 Appendix C provides additional detail for the sensitivity calculations.
yielding a          conservative              addition of 3.SE-07 to   the total shown                                    in Table          4.5-1.
a e 11ona T bl 4 5 1 AddT IS T *t R ens1 IVl[Y It esu s FPIE FIRE Seismic, High Winds, Total and Tornadoes LlCDF 9.0E-08 3.SE-07 3.8E-07 8.2E-07 LlLERF 2.0E-09 3.8E-08 N/A 4.0E-08 4.6 Key Conservatisms There are conservatisms included in this analysis that should be considered for impacts on results. On 2/8/24, an Operations crew was put in a loss of feedwater scenario in the control room simulator to validate the timing used in the FLEX HEP calculation. The scenario consisted of a total loss of feedwater and failure of AF pumps to start. Operations responded to the loss of feedwater by tripping the unit and entering the Loss of Heat Sink procedure after failing to restart the AF pumps. They simulated sending an equipment operator to open the AF crosstie valves, and then attempted to restart Feedwater and Condensate/Condensate Booster pumps. After those strategies failed, the simulated equipment operator reported back that the AF crosstie valves could not be opened. The control room responded by entering FSG-3 and directing equipment operators to begin aligning the MH FLEX pump.
In summary, the operators took 13 minutes from the LOFW to trip the unit, navigate emergency operating procedures, and finally, direct equipment operators to align the MH FLEX pump for SG feed flow. The fully developed HEP assumes the operators take 20 minutes to arrive at this decision, which is conservative.
Additionally, operators in the control room simulator had to execute post-trip actions in parallel with the AF failure and had the added stress of using multiple procedures simultaneously. In the modeled scenario, the 2B AF pump provides SG feed flow for approximately 2 hours after the unit trip. In those 2 hours, operators would have completed the post-trip actions and stabilized the unit. This is an additional conservatism because in the control room simulator, the operators had to respond to the unit trip and the loss of heat sink simultaneously.
Finally, by the time the 2B AF pump is assumed to trip at ~2 hours after the unit trip, additional Operations personnel would have reported to the station per administrative procedures in response to the plant trip.
These personnel, who are not credited in the FLEX HEP calculation, would be available to assist in the decision making or execution tasks for the MH FLEX pump alignment.
5.0 Conclusions The results of this analysis provide an overview of the impact of crediting FLEX and the Detroit Diesel testing for the SOP evaluation.
The sensitivity results show that a FLEX HEP of 0.3 or setting the 2B AF pump fail to run probability to 0.5 would yield no greater than a White finding. Considering the Detroit Diesel test ran for over 24 hours, it is reasonable to conclude that the 2B AF pump would have run for longer than the assumed ~2hours.
Additionally, the operator simulation discussed in Section 4.6 provides high confidence that the FLEX strategy can be implemented.
Additional model conservatisms have also been identified that could lead to additional reductions in the calculated risk for the Detailed Risk Evaluation, which are detailed in Appendix B.
12


11 BW-SDP-006,                       Rev. 0
BW-SDP-006, Rev. 0 6.0 References
: 1.
4101-0031-RPT-001 Revision 0, "Test Report and Past Operability Evaluation Braidwood AF Diesel Drive Test with Lube Oil Diluted by Fuel Oil". January 2024
: 2.
NRC Inspection Manual Chapter 0609 Appendix A, "The Significance Determination Process for Findings At-Power". January 2021.
13


Appendix            C  provides additional detail for the sensitivity calculations.
d FPRA HEP Changes  
 
) edits made to the FPIE and FPRA models for SOP quantifications. HFEs ending in "-F" signify FPRA HFEs, which have
T              bl                        4  5    1 AddT                                                      IS                                                      T                *t    R a                      e                                                                    -                                                                                                                  11ona ens1                  IVl[Y                                                                                                                    It esu                    s FPIE                                                                                                                      FIRE                                                                                                                Seismic, High Winds,                                                Total and                      Tornadoes LlCDF                                                          9.0E-08                                                                      3.SE-07                                                            3.8E-07                                                                                                                                                                                                                                                                          8.2E-07 LlLERF                                          2.0E-09                                                                  3.8E-08                                                                N/A                                                                                                                                                                                                                                                                                                                                      4.0E-08
 
4.6    Key                  Conservatisms There are      conservatisms                    included      in this analysis              that should          be            considered          for impacts    on                        results. On 2/8/24,    an                      Operations      crew          was                  put  in  a            loss of feedwater scenario                      in  the control              room                        simulator  to validate the timing used            in the FLEX      HEP  calculation.                      The  scenario                    consisted    of a            total loss of feedwater and                    failure of AF    pumps                      to  start. Operations    responded                  to  the loss of feedwater by                      tripping the unit and entering the Loss      of Heat  Sink procedure                after failing to    restart the AF    pumps.                    They            simulated sending            an equipment          operator              to  open                      the AF  crosstie valves, and                      then  attempted to    restart Feedwater      and Condensate/Condensate                                                                  Booster    pumps.                    After those strategies failed, the simulated equipment            operator reported back                        that the AF  crosstie valves could                not              be            opened.                      The    control            room                          responded                  by                      entering FSG-3  and                    directing equipment            operators            to    begin          aligning the MH    FLEX      pump.
 
In            summary,                                          the operators          took            13  minutes        from      the LOFW                to  trip the unit, navigate            emergency                                  operating procedures,                and                        finally, direct equipment            operators          to  align the MH      FLEX      pump                    for SG    feed flow. The fully developed    HEP  assumes                            the operators          take 20  minutes          to  arrive at this decision,  which        is conservative.
 
Additionally, operators              in  the control            room                        simulator  had            to  execute                    post-trip actions                  in  parallel with the AF  failure and                          had            the added            stress of using        multiple procedures                simultaneously.                                In              the modeled scenario,                    the 2B  AF    pump                      provides SG  feed flow for approximately                          2    hours            after the unit trip. In            those  2 hours,            operators            would                  have            completed        the post-trip actions                and                      stabilized the unit. This is an                      additional conservatism                  because                                            in  the control            room                          simulator,  the operators            had            to    respond                to  the unit trip and                      the loss of heat  sink simultaneously.
 
Finally, by                      the time the 2B  AF    pump                          is assumed                                  to  trip at ~2    hours              after the unit trip, additional Operations personnel            would                    have            reported to    the station per administrative procedures                    in  response            to  the plant trip.
These  personnel,              who                      are        not          credited in  the FLEX        HEP  calculation,                    would                        be            available      to  assist in  the decision    making                  or    execution  tasks                      for the MH    FLEX      pump                      alignment.
 
5.0  Conclusions The  results of this analysis                provide an                      overview    of the impact    of crediting FLEX      and                      the Detroit Diesel testing for the SOP  evaluation.
 
The  sensitivity results show                that a            FLEX        HEP of 0.3  or      setting the 2B AF    pump                      fail to    run                  probability  to  0.5 would                  yield no                    greater than            a          White finding. Considering    the Detroit Diesel test ran                for over      24  hours,                  it is reasonable                                to  conclude                                that the 2B  AF    pump                    would                    have              run                for longer    than            the assumed                              ~2hours.
Additionally, the operator            simulation      discussed    in  Section      4.6  provides high confidence                      that the FLEX strategy can                                be            implemented.
 
Additional model          conservatisms                    have          also          been                      identified that could                    lead to  additional reductions            in  the calculated            risk for the Detailed Risk Evaluation,                  which      are      detailed in  Appendix                B.
 
12 BW-SDP-006,                    Rev. 0
 
6.0    References
: 1.                              4101-0031-RPT-001          Revision 0,      "Test Report and                        Past Operability Evaluation                    Braidwood                          AF Diesel Drive Test with Lube                        Oil Diluted by                        Fuel Oil". January                                            2024
: 2.                                    NRC    Inspection                Manual                            Chapter 0609 Appendix              A,    "The  Significance  Determination      Process        for Findings At-Power".      January                                                2021.
 
13 d   FPRA       HEP   Changes
)   edits made                     to   the FPIE   and                       FPRA     models         for SOP   quantifications.       HFEs ending               in   "-F" signify FPRA     HFEs, which       have
:p1E version.
:p1E version.
HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update HEPs OPERATORS FAIL TO CLOSE 2.8E-02 3.8E-02 OPPOSITE UNIT AF0005 VALVES LOCALLY (LOFW)
OPERATOR FAILS TO XTIE 3.5E-03
#N/A TRAIN A or B DC BUS POWER FROM OPPOSITE UNIT (NON-ELAP)
OPERATORS FAIL TO RESTORE 1.3E-03 1.6E-03 LEVEL TO SX TOWER BASIN (BYRON ONLY)
OPS FAILS TO TRIP RCP TO 2.1 E-02 2.9E-021 PROTECT SD SEALS - NO SEAL COOLING OPS FAILS TO TRIP RCP TO 2.1 E-03 2.2E-032 PROTECT NON-SD SEALS - NO SEAL COOLING node! update HEP value was used for the FPIE SOP quantification.
nodel update HEP value was used for the FPIE SOP quantification.
14 Edits The execution time for the AF crosstie (13 minutes) was entered by mistake. The applicable execution time is 6 minutes. This is the time to close the AF005s locally per operator interviews conducted at Byron in May 2009.
This is a new action developed to replace the original action 0DC-12-XTIE-HDCOA, OPERATOR FAILS TO XTIE TRAIN B DC BUS POWER FROM OPPOSITE UNIT, which was developed for ELAP scenarios.
Removed an execution subtask found to be non-critical.
The action originally included BOP SX-12 Step F.1.c to "VERIFY/OPEN 0SX158A/B or 0SX157A/B, Essential Service Water Basin Inlet Valve." This subtask was removed as the SX CT System Notebook (BB-PRA-005.018 R3) states, "The basin makeup valves (0SX157A
& B, 0SX158A & B) are assumed to be normally open, do not need to change position, and therefore are not modeled.
Corrected execution time, Texe, from an overly conservative 5 minutes to 2 minutes based on Operations input collected on 1.2.2024 during the BW2 AF SOP effort.
Corrected execution time, Texe, from an overly conservative 5 minutes to 2 minutes based on Operations input collected on 1.2.2024 during the BW2 AF SOP effort.


HEP   EDITS   MADE   SINCE   2022   BBW                   FPIE   UPDATE
HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update Edits HEPs OPERATORS FAIL TO STOP RH 2.3E-03 6.0E-03 Edited CBOTM element Pee, "Skip a Step in Procedure",
 
PUMPS (TRANSIENT) to endstate "h". The step was originally treated as 2.6E-03 "hidden" (i.e., endstate "i"), which is considered overly conservative.
HFE    Description                                                                                                                                                                                  HEPs                                                                                    Update 1.30.2024                                                                           2022 Edits HEPs OPERATORS              FAIL TO  CLOSE                                                                                                            2.8E-02                                                                            3.8E-02 The    execution                            time for the AF  crosstie (13    minutes)          was OPPOSITE          UNIT            AF0005        VALVES                                                                                                    entered    by                  mistake. The    applicable        execution                          time is 6 LOCALLY          (LOFW)                                                                                                                                  minutes.            This is the time to  close      the AF005s      locally    per operator              interviews conducted                                  at  Byron                              in  May                2009.
Current Pee entry:  
OPERATOR            FAILS    TO  XTIE                                                                                                                                                3.5E-03                                                                                            #N/A This is a        new                action              developed      to    replace    the original TRAIN      A  or      B  DC    BUS                POWER                                                                                                  action                0DC-12-XTIE-HDCOA,                    OPERATOR              FAILS  TO FROM      OPPOSITE          UNIT                (NON-                                                                                                    XTIE      TRAIN          B  DC    BUS              POWER                  FROM      OPPOSITE ELAP)                                                                                                                                                      UNIT,              which      was                developed      for ELAP    scenarios.
- The Note located prior to Step 25 in FRH1 specifically states that the RH pumps should not be run longer than 2.4 hours without CC flow applied to the RH HX. (Not treated as "hidden".)  
OPERATORS                FAIL TO    RESTORE                                                                          1.3E-03                                                                            1.6E-03 Removed                            an                  execution                          subtask                found                        to    be          non-critical.
- The crew is possibly in more than one procedure, depending on the given scenario. ("Multiple" procedures selected.)  
LEVEL            TO    SX    TOWER                    BASIN                                                                                              The    action                originally included        BOP    SX-12          Step F.1.c      to (BYRON            ONLY)                                                                                                                                    "VERIFY/OPEN                            0SX158A/B            or    0SX157A/B,                Essential Service Water          Basin        Inlet Valve."            This subtask                was removed                  as        the SX      CT  System            Notebook                              (BB-PRA-005.018          R3)    states, "The    basin                makeup                            valves  (0SX157A
- While the direction is located within a Note with a border, it is not considered to be graphically distinct.  
                                                                                                                                                                                &    B,    0SX158A          &    B)  are      assumed                          to  be          normally                      open,                    do not          need            to  change                          position,  and                  therefore are    not modeled.
-While the BBW operators use the circle/slash method of placekeeping and this method satisfies the requirements of Constellation procedure HU-AA-104-101, because the 2.4-hour direction is located in a Note and in not in a procedure step, no credit is taken for placekeeping aids.
OPS    FAILS    TO  TRIP      RCP    TO                                                                                                                                                            2.1 E-02                                                                    2.9E-02      1 Corrected    execution                          time, Texe,          from          an                    overly PROTECT          SD  SEALS      -          NO  SEAL                                                                                                    conservative                  5  minutes          to  2  minutes            based                        on COOLING                                                                                                                                                  Operations          input  collected on                  1.2.2024        during      the BW2 AF    SOP  effort.
OPERATORS FAIL TO REFILL 1.4E-04 6.9E-04 1 AF01 PB-FO-HXVOA-F is for refilling the OOAF fuel oil OOAFP FUEL OIL DAY TANK supply for the non-SOP unit (Unit 1). While there is FROM STORAGE TANK 5.7E-043 5.7E-03 sufficient time to support the feasibility for TSC activation
OPS    FAILS    TO  TRIP      RCP    TO                                                                                                                                                            2.1 E-03                                                  2.2E-03      2 Corrected    execution                          time, Texe,          from        an                  overly PROTECT          NON-SD        SEALS      -          NO                                                                                                  conservative                  5  minutes          to  2  minutes            based                        on SEAL  COOLING                                                                                                                                            Operations          input  collected on                  1.2.2024        during      the BW2 AF    SOP    effort.
("ERF Review" in the HRAC), TSC recovery credit was not applied in the baseline HEP calc as an Alert was not assured for every scenario in which this action is credited. TSC activation is justified and applied in the SOP scenario.  
 
,.5E-04 was used in FPRA quantification.
node!                    update            HEP  value            was                      used          for the FPIE    SOP  quantification.
15  
nodel            update            HEP  value            was                      used          for the FPIE    SOP  quantification.
 
14 HEP    EDITS    MADE    SINCE    2022  BBW                  FPIE  UPDATE
 
HFE   Description                                                                                                                                                                                               HEPs                                                                                   Update                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Edits 1.30.2024                                                                            2022 HEPs OPERATORS       FAIL TO   STOP   RH                                                                                       2.3E-03                                                                             6.0E-03                                                             Edited CBOTM element   Pee, "Skip a           Step in   Procedure",
PUMPS                 (TRANSIENT)                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           to endstate   "h". The   step was               originally treated as 2.6E-03                                                                                                                                                                                                                                                               "hidden"   (i.e., endstate   "i"), which       is considered           overly conservative.
Current   Pee entry:
                                                                                                                                                                                                                                -       The   Note located       prior to   Step 25 in   FRH1     specifically states that the RH       pumps                   should         not           be             run             longer     than 2.4   hours           without CC   flow applied to   the RH       HX.       (Not treated as         "hidden".)
                                                                                                                                                                                                                              -       The   crew         is possibly       in more             than             one                   procedure, depending             on                   the given scenario.                   ("Multiple" procedures selected.)
                                                                                                                                                                                                                              -         While the direction is located     within a           Note with a border,         it is not         considered           to   be           graphically distinct.
                                                                                                                                                                                                                              -While the BBW             operators         use       the circle/slash method           of placekeeping     and                   this method           satisfies the requirements of Constellation procedure                 HU-AA-104-101,                     because                                 the 2.4-hour                 direction is located       in a         Note   and                       in   not             in a procedure                 step, no                   credit is taken           for placekeeping     aids.
OPERATORS       FAIL TO     REFILL                                                                                                                       1.4E-04                                                                           6.9E-04                                                             1 AF01 PB-FO-HXVOA-F                         is for refilling the OOAF fuel oil OOAFP FUEL               OIL DAY   TANK                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     supply       for the non-SOP                             unit (Unit       1). While there is FROM   STORAGE     TANK                                                                                                                                                                                                     5.7E-04  3                                                                          5.7E-03                                                           sufficient time to   support     the feasibility for TSC   activation
("ERF     Review" in the HRAC),   TSC   recovery               credit was not         applied in the baseline       HEP calc           as           an                 Alert was                 not assured           for every       scenario                     in which     this action                 is credited. TSC   activation         is justified and                   applied in the SOP scenario.
 
,.5E-04 was                     used             in   FPRA       quantification.
 
15 HEP  EDITS    MADE      SINCE    2022    BBW                  FPIE    UPDATE
 
HFE  Description                                                                                                                                                                                          HEPs                                                                                    Update                                                                                                                                                                                                                                                                                                                                                                                                                                                      Edits 1.30.2024                                                                            2022 HEPs SOP    INTERVAL                      1  HEP  EDITS p                                                                                                      OPERATORS          FAIL TO ALIGN                                                                                                                                6.3E-02                                                                                                                        N/A                                                                                This action                was                developed    to  reflect use        of the MH    FLEX FLEX      PUMP                  FOR    SG                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    pump                  taking  suction                on                  the RWST              for the SDP-1 INVENTORY                      MAKEUP                  (GIVEN                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      exposure                          period. This baseline        version    adds            an 1.88    HR  AF  SUCCESS,                  EXEC                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      additional  20  minutes          to  the execution                        time for ONLY)                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                communication                                                        between                  the operators          executing                  the alignment            and                    shift Operations      management                                                  as        the execution                          procedures                  do          not          exactly                  match              the non-ELAP    scenario                  and                    step omissions will                                                                                                                                              be          needed.
Given  the cue                timing, the same                    HEP  applies for FPIE  and Fire.
OPERATORS          FAIL TO    CLOSE                                                                                                                      1.4E-03                                                                                                                N/A                                                                                                  Tsw:        With AF    success                for 1.88  hours,              reestablishing SG OPPOSITE        UNIT          AF0005      VALVES                                                                                                                                                                                                                                                                                                                                                                                                                                                                    feed by                  the 349.6    minute          (5.83    hours)              point allows LOCALLY        (1.88    HR AF                                                                                                                                                                                                                              2.2E-03                                                                                                                                                                                                                                                  avoidance                              of core            damage                            per MAAP  run credit)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  BB_506_OSG_DD188_FLEXh.                                                    This is past  SG  dryout                  as allowed            by                  2BwFR-H        .1      Attachment              B and                    supported        by multiple operator            interviews.
OPERATORS          FAIL TO    EXECUTE                                                                                            2.5E-03                                                                                                                N/A                                                                                                  Tsw:        With AF    success                for 1.88  hours,              reestablishing SG AF  CROSSTIE        FROM    OPPOSITE                                                                                                                                                                                                                                                                                                                                                                                                                                                        feed by                  the 349.6    minute          (5.83    hours)              point allows UNIT                (EXE        ONLY;    1.88  HR AF                                                                                                                        2.?E-03                                                                                                                                                                                                                                                avoidance                              of core            damage                            per MAAP  run credit)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  BB_506_OSG_DD188_FLEXh.                                                  This is past SG  dryout                  as allowed          by                  2BwFR-H.1            Attachment            Band                      supported        by multiple operator            interviews.
FIRE    -          OPERATORS        FAIL TO                                                                                                                                6.?E-03                                                                                                          N/A                                                                                                Tsw:        With AF    success                for 1.88  hours,              reestablishing SG OPEN  AF005      VALVES                        (LOCALLY                                                                                                                                                                                                                                                                                                                                                                                                                                                              feed by                    the 349.6    minute          (5.83    hours)              point allows FAIL AIR;      LOFW            w          1.88    HR  AF                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    avoidance                              of core          damage                            per MAAP  run credit)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  BB_506_OSG_DD188_FLEXh.                                                    This is past SG  dryout                  as allowed          by                  2BwFR-H.1            Attachment              B and                    supported        by multiple operator            interviews.
OPERATOR          FAILS TO    START                                                                                                                          1.8E-03                                                                                                          N/A                                                                                                Tsw:        With AF    success                for 1.88  hours,              reestablishing SG MOTOR-DRIVEN                    AFW            PUMP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            feed by                  the 349.6    minute          (5.83    hours)              point allows AFTER        FAILURE                      OF    DC    (1.88    HR                                                                  5.2E-02                                                                                                                                                                                                                                                avoidance                                of core          damage                              per MAAP    run AF  credit)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              BB_506_OSG_DD188_FLEXh. This                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    is past  SG  dryout                  as allowed            by                  2BwFR-H        .1      Attachment              B and                    supported        by multiple operator            interviews.
 
16 HEP    EDITS    MADE    SINCE    2022    BBW                  FPIE  UPDATE
 
HFE    Description                                                                                                                                                                            HEPs                                                                                    Update                                                                                                                                                                                                                                                                                                                                                                                                                                                                Edits 1.30.2024                                                                              2022 HEPs OPERATORS          FAIL TO    LOCALLY                                                                                  2.3E-03                                                                                                                N/A                                                                                                  Tsw:      With AF  success                for 1.88 hours,              reestablishing SG START  8  AUXILIARY                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      feed by                the 349.6    minute          (5.83  hours)              point allows FEEDWATER                  PUMP                (1.88    HR AF                                                                                                                                                                                                                                                                                                                                                                                                                                                avoidance                              of core            damage                            per MAAP    run credit)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            88_506_OSG_DD188_FLEXh.                                                      This is past SG    dryout                as allowed          by                  28wFR-H.1              Attachment            8    and                    supported      by multiple operator          interviews.
OPERATORS          FAIL TO    MANUALLY                                                                      5.4E-04                                                                                                                N/A                                                                                                  Tsw:      With AF    success                for 1.88 hours,              reestablishing SG START AF    PUMPS                    FROM    CR                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              feed by                  the 349.6    minute          (5.83  hours)              point allows (1.88    HR  AF  credit)_SDP                                                                                                                                                                                                                                  1.1 E-03                                                                                                                                                                                                                                                    avoidance                              of core          damage                            per MAAP  run 88_506_OSG_DD188_FLEXh.                                                      This is past SG  dryout                  as allowed        by                  28wFR-H.1              Attachment            8    and                    supported      by multiple operator            interviews.
OPERATORS          FAIL TO                                                                                                                                                                                                                                                                                8.1 E-04                                                                                                            N/A                                                                                                  Tsw:      With AF  success                for 1.88 hours,              reestablishing SG RECOGNIZE          THE    LOSS  OF                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                feed by                  the 349.6    minute          (5.83  hours)              point allows SECONDARY            COOLING                                                                                                                                                                                                7.0E-04                                                                                                                                                                                                                                                      avoidance                              of core            damage                              per MAAP    run (COGNITIVE                      ONLY;      1.88  HR                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        88_506_OSG_DD188_FLEXh.                                                      This is past SG  dryout                as AF)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          allowed          by                  28wFR-H.1                Attachment          8    and                    supported        by multiple operator          interviews.
OPERATORS          FAIL TO    RESTORE                                                                          1.0E-03                                                                                                              N/A                                                                                                  Tsw:      With AF  success                for 1.88 hours,              reestablishing SG ALTERNATE        FEEDWATER              (EXE                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  feed by                  the 349.6    minute          (5.83  hours)              point allows ONLY;      1.88    HRAF      credit)_SDP                                                                                                      1.4E-02                                                                                                                                                                                                                                                        avoidance                              of core            damage                              per MAAP    run 88_506_OSG_DD188_FLEXh.                                                      This is past SG  dryout                as allowed          by                  28wFR-H.1              Attachment            8    and                    supported      by multiple operator          interviews.
OPERATORS          FAIL TO    EXECUTE                                                                                        2.4E-04                                                                                                                N/A                                                                                                  Tsw:        For    the 8&F    action              for the SDP-1    interval (AF TO  OPEN      PZR        PORVS                  FOR      8/F                                                                                                                                                                                                                                                                                                                                                                                                                                                                        success                for 1.88  hours),              MAAP  run COOLING      (EXE        ONLY;    1.88  HR                                                                                                  2.8E-02                                                                                                                                                                                                                              88506_        1 PORV    _    1SI_DDAFW188d indicates                                                                                                                                                                                                                                                                            core AF  credit)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              damage                            can                            be            avoided          if 8&F    is initiated within 204.0 minutes.      This is NOT  prior to    SG  dryout.
FIRE    -        OPS    FAILS TO  OPEN    PZR                                                                      2.4E-04                                                                                                                      N/A                                                                                                  Tsw:        For    the 8&F    action              for the SDP-1    interval (AF PORVS                FOR      8/F    COOLING    (EXE                                                                                                                                                                                                                                                                                                                                                                                                                                                            success                for 1.88  hours),              MAAP  run ONLY,      LOFW              w          1.88  HR  AF  credit,                                                                                                                                                                                                                                                                                                                                                                            88506_        1 PORV    _    1SI_DDAFW188d                          indicates core Pe  Recovery)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            damage                            can                          be          avoided          if 8&F    is initiated within 204.0 minutes.        This is NOT prior to    SG    dryout.


17 HEP   EDITS     MADE   SINCE   2022   BBW                   FPIE   UPDATE
HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update Edits HEPs SOP INTERVAL 1 HEP EDITS p
OPERATORS FAIL TO ALIGN 6.3E-02 N/A This action was developed to reflect use of the MH FLEX FLEX PUMP FOR SG pump taking suction on the RWST for the SDP-1 INVENTORY MAKEUP (GIVEN exposure period. This baseline version adds an 1.88 HR AF SUCCESS, EXEC additional 20 minutes to the execution time for ONLY) communication between the operators executing the alignment and shift Operations management as the execution procedures do not exactly match the non-ELAP scenario and step omissions will be needed.
Given the cue timing, the same HEP applies for FPIE and Fire.
OPERATORS FAIL TO CLOSE 1.4E-03 N/A Tsw: With AF success for 1.88 hours, reestablishing SG OPPOSITE UNIT AF0005 VALVES feed by the 349.6 minute (5.83 hours) point allows LOCALLY (1.88 HR AF 2.2E-03 avoidance of core damage per MAAP run credit)_SDP BB_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
OPERATORS FAIL TO EXECUTE 2.5E-03 N/A Tsw: With AF success for 1.88 hours, reestablishing SG AF CROSSTIE FROM OPPOSITE feed by the 349.6 minute (5.83 hours) point allows UNIT (EXE ONLY; 1.88 HR AF 2.?E-03 avoidance of core damage per MAAP run credit)_SDP BB_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 2BwFR-H.1 Attachment Band supported by multiple operator interviews.
FIRE - OPERATORS FAIL TO 6.?E-03 N/A Tsw: With AF success for 1.88 hours, reestablishing SG OPEN AF005 VALVES (LOCALLY feed by the 349.6 minute (5.83 hours) point allows FAIL AIR; LOFW w 1.88 HR AF avoidance of core damage per MAAP run credit)_SDP BB_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
OPERATOR FAILS TO START 1.8E-03 N/A Tsw: With AF success for 1.88 hours, reestablishing SG MOTOR-DRIVEN AFW PUMP feed by the 349.6 minute (5.83 hours) point allows AFTER FAILURE OF DC (1.88 HR 5.2E-02 avoidance of core damage per MAAP run AF credit)_SDP BB_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
16


HFE   Description                                                                                                                                                                                       HEPs                                                                                       Update                                                                                                                                                                                                                                                                                                                                                                                                                                                             Edits 1.30.2024                                                                              2022 HEPs OPERATORS       FAIL TO     INITIATE SI                                                            1.5E-04                                                                                                               N/A                                                                                                 Tsw:         For   the B&F   action             for the SDP-1     interval (AF FOR     BLEED AND                                                                                                              FEED                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                success                 for 1.88 hours),           MMP    run COOLING     (EXE       ONLY;       1.88   HR                                                                                                       1.0E-02                                                                                                                                                                                                                                                     BB506_    1 PORV     _   1SI_DDAFW188d                           indicates core AF   credit)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 damage                               can                             be           avoided         if B&F   is initiated within 204.0 minutes.       This is NOT prior to   SG   dryout.
HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update Edits HEPs OPERATORS FAIL TO LOCALLY 2.3E-03 N/A Tsw: With AF success for 1.88 hours, reestablishing SG START 8 AUXILIARY feed by the 349.6 minute (5.83 hours) point allows FEEDWATER PUMP (1.88 HR AF avoidance of core damage per MAAP run credit)_SDP 88_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 28wFR-H.1 Attachment 8 and supported by multiple operator interviews.
FIRE   -         OPERATORS          FAIL TO                                                                                                                                   1.5E-04                                                                                                               N/A                                                                                                 Tsw:         For   the B&F   action             for the SDP-1     interval (AF INITIATE  SI      FOR   BLEED  AND                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              success                 for 1.88 hours),           MMP  run FEED  COOLING      (EXE        ONLY,                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       BB506_    1 PORV      _  1SI_DDAFW188d                          indicates core LOFW           w           1.88 HR AF credit,                                           Pe                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   damage                                 can                             be           avoided         if B&F   is initiated within 204.0 Recovery)                                      SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                minutes.       This is NOT prior to   SG   dryout.
OPERATORS FAIL TO MANUALLY 5.4E-04 N/A Tsw: With AF success for 1.88 hours, reestablishing SG START AF PUMPS FROM CR feed by the 349.6 minute (5.83 hours) point allows (1.88 HR AF credit)_SDP 1.1 E-03 avoidance of core damage per MAAP run 88_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 28wFR-H.1 Attachment 8 and supported by multiple operator interviews.
BASE        CASE  AND      SOP  INTERVAL                      2  HEP  EDITS
OPERATORS FAIL TO 8.1 E-04 N/A Tsw: With AF success for 1.88 hours, reestablishing SG RECOGNIZE THE LOSS OF feed by the 349.6 minute (5.83 hours) point allows SECONDARY COOLING 7.0E-04 avoidance of core damage per MAAP run (COGNITIVE ONLY; 1.88 HR 88_506_OSG_DD188_FLEXh. This is past SG dryout as AF)_SDP allowed by 28wFR-H.1 Attachment 8 and supported by multiple operator interviews.
;cenarios,                    the original baseline          actions            for SG  feed restoration and                      Bleed and                      Feed  (B&F)    used        a          system      window                      that reflected N      SG    level at -45  seconds.                      Operator    interviews and                    observed                simulator  scenarios                identified that the                                                  BBW            crews        are    trained to    insert
OPERATORS FAIL TO RESTORE 1.0E-03 N/A Tsw: With AF success for 1.88 hours, reestablishing SG ALTERNATE FEEDWATER (EXE feed by the 349.6 minute (5.83 hours) point allows ONLY; 1.88 HRAF credit)_SDP 1.4E-02 avoidance of core damage per MAAP run 88_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 28wFR-H.1 Attachment 8 and supported by multiple operator interviews.
:Jiately upon                          the recognition          of the total loss of feed condition.              The    SG    Feed    restoration and                      B&F  actions            were      revised to    reflect a          split reactor      trip at  30  seconds                      with a        failure rate of  10%. That    is, the HEPs for total LOFW              initiators and                    failure of AF  were    numerically
OPERATORS FAIL TO EXECUTE 2.4E-04 N/A Tsw: For the 8&F action for the SDP-1 interval (AF TO OPEN PZR PORVS FOR 8/F success for 1.88 hours), MAAP run COOLING (EXE ONLY; 1.88 HR 2.8E-02 88506_ 1 PORV _ 1SI_DDAFW188d indicates core AF credit)_SDP damage can be avoided if 8&F is initiated within 204.0 minutes. This is NOT prior to SG dryout.
FIRE - OPS FAILS TO OPEN PZR 2.4E-04 N/A Tsw: For the 8&F action for the SDP-1 interval (AF PORVS FOR 8/F COOLING (EXE success for 1.88 hours), MAAP run ONLY, LOFW w 1.88 HR AF credit, 88506_ 1 PORV _ 1SI_DDAFW188d indicates core Pe Recovery)_SDP damage can be avoided if 8&F is initiated within 204.0 minutes. This is NOT prior to SG dryout.
17


HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update Edits HEPs OPERATORS FAIL TO INITIATE SI 1.5E-04 N/A Tsw: For the B&F action for the SDP-1 interval (AF FOR BLEED AND FEED success for 1.88 hours), MMP run COOLING (EXE ONLY; 1.88 HR 1.0E-02 BB506_ 1 PORV _ 1SI_DDAFW188d indicates core AF credit)_SDP damage can be avoided if B&F is initiated within 204.0 minutes. This is NOT prior to SG dryout.
FIRE - OPERATORS FAIL TO 1.5E-04 N/A Tsw: For the B&F action for the SDP-1 interval (AF INITIATE SI FOR BLEED AND success for 1.88 hours), MMP run FEED COOLING (EXE ONLY, BB506_ 1 PORV _ 1SI_DDAFW188d indicates core LOFW w 1.88 HR AF credit, Pe damage can be avoided if B&F is initiated within 204.0 Recovery) SOP minutes. This is NOT prior to SG dryout.
BASE CASE AND SOP INTERVAL 2 HEP EDITS
;cenarios, the original baseline actions for SG feed restoration and Bleed and Feed (B&F) used a system window that reflected N SG level at -45 seconds. Operator interviews and observed simulator scenarios identified that the BBW crews are trained to insert
:Jiately upon the recognition of the total loss of feed condition. The SG Feed restoration and B&F actions were revised to reflect a split reactor trip at 30 seconds with a failure rate of 10%. That is, the HEPs for total LOFW initiators and failure of AF were numerically
[0.1 *(HEPsase) + 0.9*(HEPsoP-2)]
[0.1 *(HEPsase) + 0.9*(HEPsoP-2)]
1e baseline         HEPs associated               with the common                                                   cognitive action,                 1 FW-FRH1-FHSGOA,                                       all used         the time to   optimized B&F as         a zed B&F time is 30   minutes       for scenarios               that only                   credit the automatic                         plant trip on                     low       SG     level. This is conservative         for SG feed
1e baseline HEPs associated with the common cognitive action, 1 FW-FRH1-FHSGOA, all used the time to optimized B&F as a zed B&F time is 30 minutes for scenarios that only credit the automatic plant trip on low SG level. This is conservative for SG feed  
~un                     BB_NoBF           _Scram_AutoC                                                 (LOFW             with no               AFW           and                   automatic                           plant trip on                   low         SG   level) indicates that the SGs will retain
~un BB_NoBF _Scram_AutoC (LOFW with no AFW and automatic plant trip on low SG level) indicates that the SGs will retain  
>red by                   39.9   minutes.
>red by 39.9 minutes.
OPERATORS         FAIL TO   CLOSE                                                                                                                     1.4E-03                                                                                                               N/A                                                                                                 Tsw:       BB_NoBF         _Scram30E                               includes     credit for a         manual OPPOSITE       UNIT           AF0005       VALVES                                                                                                                                                                                                                                                                                                                                                                                                                                                               reactor     trip upon                             recognition         of the LOFW.           If AFW               is LOCALLY     (LOFW             w         30s trip)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                         initiated by                   2.46   hours             (147.6 minutes)         core           damage                                   is avoided.           (Max                   core           temperature   node                 of 1796F). This is past SG   dryout               as         allowed       by                   2BwFR-H.1           Attachment             B and                   supported       by                   multiple operator           interviews.
OPERATORS FAIL TO CLOSE 1.4E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual OPPOSITE UNIT AF0005 VALVES reactor trip upon recognition of the LOFW. If AFW is LOCALLY (LOFW w 30s trip)_SDP initiated by 2.46 hours (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
G                                                                                           OPERATORS         FAIL TO   CLOSE                                                                                                                 6.6E-03                                                                                 3.8E-02                                                                   Tsw:       MMP   Run                     BB_NoBF           _Scram_AutoC                                                 (LOFW             with OPPOSITE     UNIT           AF0005       VALVES                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               no               AFW           and                   automatic                         plant trip on                   low       SG   level)
G OPERATORS FAIL TO CLOSE 6.6E-03 3.8E-02 Tsw: MMP Run BB_NoBF _Scram_AutoC (LOFW with OPPOSITE UNIT AF0005 VALVES no AFW and automatic plant trip on low SG level)
LOCALLY     (LOFW)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         indicates that the SGs will retain inventory             if SG feed is restored by                   the 39.9   minute           point. (Note the 2022   HEP value           includes the higher Texe         value         which     was               corrected in the SOP effort and                       in the working           copy                     of the HRAC.)
LOCALLY (LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point. (Note the 2022 HEP value includes the higher Texe value which was corrected in the SOP effort and in the working copy of the HRAC.)
 
18  
18 HEP    EDITS    MADE      SINCE    2022  BBW                  FPIE    UPDATE
 
HFE  Description                                                                                                                                                                                    HEPs                                                                                  Update                                                                                                                                                                                                                                                                                                                                                                                                                                                      Edits 1.30.2024                                                                            2022 HEPs OPERATORS            FAIL TO    EXECUTE                                                                                        2.5E-03                                                                                                                N/A                                                                                                Tsw:        BB_NoBF            _Scram30E                                  includes      credit for a          manual AF  CROSSTIE          FROM      OPPOSITE                                                                                                                                                                                                                                                                                                                                                                                                                                    reactor        trip upon                            recognition          of the LOFW.            If AFW              is UNIT                (EXE        ONLY;      LOFWw                      30s                                                                                                                                                                                                                                                                                                                                                                                                                                                                              initiated by                  2.46    hours              (147.6    minutes)            core          damage                                    is trip)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  avoided.              (Max                  core          temperature        node                  of 1796F). This is past  SG  dryout                  as          allowed        by                  2BwFR-H.1              Attachment              B and                  supported        by                  multiple operator              interviews.
3                                                                                                  OPERATORS            FAIL TO    EXECUTE                                                                                                                2.1 E-02                                                                            7.0E-02                                                                      Tsw:        MAAP    Run                    BB_NoBF            _Scram_AutoC                                                (LOFWwith AF    CROSSTIE          FROM      OPPOSITE                                                                                                                                                                                                                                                                                                                                                                                                                              no              AFW            and                  automatic                          plant  trip on                    low          SG    level)
UNIT                (EXE        ONLY;      LOFW)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                indicates that the SGs will retain inventory              if SG  feed is restored by                  the 39.9  minute            point.
OPERATORS            FAIL TO  OPEN                                                                                                                              4.0E-02                                                                                                          N/A                                                                                                Tsw:        BB_NoBF            _Scram30E                                  includes      credit for a          manual AF005      VALVES                          (LOCALLY          FAIL                                                                                                                                                                                                                                                                                                                                                                                                                                                          reactor        trip upon                            recognition            of the LOFW.              If AFW              is AIR;      LOFW            w        30s trip)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    initiated by                2.46    hours            (147.6    minutes)          core            damage                                is avoided.              (Max                  core          temperature        node                  of 1796F). This is past  SG  dryout                  as          allowed        by                2BwFR-H.1              Attachment              B and                  supported          by                  multiple operator            interviews.
 
~                                                                                                          OPERATORS            FAIL TO    OPEN                                                                                                                                                                4.1 E-02                                                                            9.7E-02                                                                  Tsw:        MAAP    Run                    BB_NoBF            _Scram_AutoC                                                (LOFW              with J
AF005      VALVES                        (LOCALLY          FAIL                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              no              AFW            and                  automatic                        plant  trip on                  low        SG    level)
AIR;      LOFW)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          indicates that the SGs will retain inventory              if SG  feed is restored by                  the 39.9  minute            point.
OPERATOR          FAILS  TO    START                                                                                                                            1.SE-03                                                                                                            N/A                                                                                                    Tsw:        BB_NoBF          _Scram30E                                  includes      credit for a          manual MOTOR-DRIVEN                      AFW            PUMP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    reactor        trip upon                            recognition            of the LOFW.            If AFW              is AFTER        FAILURE                    OF    DC  (LOFW              w                                                                                                                                                                                                                                                                                                                                                                                                                                        initiated by                  2.46    hours              (147.6    minutes)            core          damage                                  is 30s trip)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        avoided.              (Max                  core          temperature        node                  of 1796F). This is past  SG    dryout                as          allowed        by                  2BwFR-H.1              Attachment              B and                  supported        by                  multiple operator            interviews.
RIG                                                                OPERATOR          FAILS  TO    START                                                                                                                              7.SE-03                                                                              2.SE-02                                                                    Tsw:        MAAP    Run                    BB_NoBF            _Scram_AutoC                                                  (LOFW            with MOTOR-DRIVEN                      AFW            PUMP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            no              AFW            and                  automatic                          plant  trip on                  low        SG    level)
AFTER        FAILURE                    OF    DC                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    indicates that the SGs will retain inventory              if SG  feed is (LOFW)                          SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      restored by                    the 39.9  minute            point.
 
19 HEP    EDITS    MADE      SINCE    2022    BBW                  FPIE    UPDATE
 
HFE    Description                                                                                                                                                                                    HEPs                                                                                      Update                                                                                                                                                                                                                                                                                                                                                                                                                                                                Edits 1.30.2024                                                                                2022 HEPs OPERATORS            FAIL TO    LOCALLY                                                                                  2.3E-03                                                                                                                N/A                                                                                              Tsw:        BB_NoBF            _Scram30E                                  includes      credit for a          manual START    B AUXILIARY                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        reactor        trip upon                            recognition          of the LOFW.            If AFW              is FEEDWATER                  PUMP                (LOFW              w          30s                                                                                                                                                                                                                                                                                                                                                                                                                  initiated by                  2.46    hours              (147.6    minutes)          core          damage                                    is trip)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            avoided.              (Max                  core          temperature        node                  of 1796F). This is past  SG  dryout                as        allowed        by                  2BwFR-H.1            Attachment                B and                  supported          by                  multiple operator            interviews.
~IG                                                                        OPERATORS            FAIL TO    LOCALLY                                                                                    9.6E-03                                                                                1.5E-02                                                                Tsw:        MAAP      Run                    BB_NoBF            _Scram_AutoC                                                (LOFW              with START  B AUXILIARY                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      no              AFW            and                  automatic                          plant  trip on                  low      SG    level)
FEEDWATER                    PUMP                (LOFW)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                      indicates that the SGs will retain inventory              if SG  feed is restored by                  the 39.9    minute            point.
OPERATORS            FAIL TO    MANUALLY                                                                        5.4E-04                                                                                                          N/A                                                                                                  Tsw:        BB_NoBF            _Scram30E                                  includes      credit for a          manual START AF    PUMPS                    FROM      CR                                                                                                                                                                                                                                                                                                                                                                                                                                                                              reactor        trip upon                            recognition          of the LOFW.              If AFW                is (LOFWw                        30s trip)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        initiated by                  2.46    hours              (147.6    minutes)          core          damage                                    is avoided.              (Max                  core          temperature        node                  of  1796F). This is past  SG  dryout                as          allowed        by                  2BwFR-H.1              Attachment                B and                  supported          by                  multiple operator            interviews.
RIG                                                                  OPERATORS            FAIL TO    MANUALLY                                                                        8.7E-04                                                                                1.7E-03                                                                Tsw:        MAAP    Run                    BB_NoBF            _Scram_AutoC                                                (LOFW              with START AF    PUMPS                    FROM      CR                                                                                                                                                                                                                                                                                                                                                                                                                                                                              no              AFW            and                  automatic                        plant trip on                    low        SG    level)
(LOFW)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  indicates that the SGs will retain inventory              if SG  feed is restored by                  the 39.9  minute            point.
OPERATORS            FAIL RECOGNIZE                                                                                                                      8.1 E-04                                                                                                      N/A                                                                                              Tsw:        BB_NoBF            _Scram30E                                includes      credit for a          manual THE    LOSS    OF  SECONDARY                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                reactor        trip upon                            recognition            of the LOFW.              If AFW              is COOLING        (COGNITIVE                      ONLY;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    initiated by                  2.46    hours              (147.6    minutes)          core          damage                                      is LOFW            w          30s trip_no    AF)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                avoided.              (Max                    core          temperature        node                  of 1796F). This is past  SG  dryout                as          allowed        by                  2BwFR-H.1              Attachment                B and                  supported          by                  multiple operator            interviews.
IIG                                                                        OPERATORS            FAIL  RECOGNIZE                                                                                            2.2E-03                                                                              3.3E-03                                                                Tsw:        MAAP      Run                    BB_NoBF            _Scram_AutoC                                                (LOFW              with THE    LOSS      OF  SECONDARY                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                no              AFW            and                  automatic                          plant  trip on                  low        SG    level)
COOLING        (COGNITIVE                      ONLY;                                                                                                                                                                                                                                                                                                                                                                                                                                                                            indicates that the SGs will retain inventory              if SG  feed is LOFW)                        SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            restored by                the 39.9  minute            point.
 
20 HEP    EDITS    MADE      SINCE    2022    BBW                  FPIE    UPDATE
 
HFE  Description                                                                                                                                                                              HEPs                                                                                  Update                                                                                                                                                                                                                                                                                                                                                                                                                                                                Edits 1.30.2024                                                                          2022 HEPs OPERATORS        FAIL TO    RESTORE                                                                            1.0E-03                                                                                                                    N/A                                                                                                  Tsw:      BB_NoBF          _Scram30E                                  includes  credit for a          manual ALTERNATE    FEEDWATER                (EXE                                                                                                                                                                                                                                                                                                                                                                                                                                                                          reactor      trip upon                            recognition          of the LOFW.            If AFW              is ONLY;    LOFWw                        30s trip)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    initiated by                  2.46  hours              (147.6  minutes)        core          damage                                is avoided.            (Max                  core          temperature    node                of 1796F). This is past SG    dryout                as          allowed        by                    2BwFR-H.1          Attachment              B and                  supported      by                    multiple operator          interviews.
~IG                                                                        OPERATORS        FAIL TO    RESTORE                                                                              1.0E-02                                                                              3.6E-02                                                                  Tsw:      MMP  Run                      BB_NoBF          _Scram_AutoC                                                  (LOFW            with ALTERNATEFEEDWATER(EXE                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      no              AFW            and                  automatic                          plant trip on                    low        SG    level)
ONLY;    LOFW)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  indicates that the                                                      SGs will retain inventory            if SG  feed is restored by                  the 39.9    minute          point.
OPERATORS        FAIL TO    EXECUTE                                                                                          2.4E-04                                                                                                                                                  N/A                                                                                        Tsw:      MMP  run              BB_LatestBF _Scram_30A,                                        indicates that TO  OPEN      PZR        PORVS                  FOR    B/F                                                                                                                                                                                                                                                                                                                                                                                                                                                              the latest time for B&F to  prevent core          damage                            with a COOLING      (EXE      ONLY;    LOFWw                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  manual                                    plant trip at 30  seconds                          and                  without SG  feed is 30s trip) SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          71.4  minutes.
,                                                                                OPERATORS        FAIL TO    EXECUTE                                                                                          4.2E-03                                                                            4.2E-03                                                                    Tsw:          In          order to  avoid          core          damage,                              bleed and                    feed TO  OPEN      PZR        PORVS                  FOR    B/F                                                                                                                                                                                                                                                                                                                                                                                                                                                                              would                  have          to  be          initiated by                    30  minutes          (Tsw)      per BBW COOLING      (EXE      ONLY;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      MMP    run              BB0007c          (LOFW            with no              AFW              and                  automatic LOFW)                            SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      plant trip on                  low        SG    level).
OPERATORS        FAIL TO    INITIATE  SI                                                            1.5E-04                                                                                                                                                  NIA                                                                                                      Tsw:      MMP  run              BB_LatestBF _Scram_30A,                                          indicates that FOR    BLEED AND    FEED                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  the latest time for B&F  to  prevent core          damage                            with a COOLING      (EXE      ONLY;    LOFWw                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    manual                                      plant trip at 30  seconds                        and                  without SG  feed is 30s trip) SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  71.4  minutes.
OPERATORS        FAIL TO    INITIATE  SI                                                            1.6E-03                                                                            1.6E-03                                                                      Tsw:          In            order to  avoid          core          damage,                              bleed and                    feed FOR    BLEED AND    FEED                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        would                  have          to    be            initiated by                    30  minutes          (Tsw)    per BBW COOLING      (EXE      ONLY;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    MAAP  run              BB0007c          (LOFW            with no              AFW              and                  automatic LOFW)                          SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        plant trip on                    low        SG    level).
FIRE    -        OPERATORS        FAIL TO                                                                                                                                    1.7E-03                                                                                                                                                  N/A                                                                                        Tsw:      BB_NoBF          _Scram30E                                  includes    credit for a          manual CLOSE    OPPOSITE      UNIT          AF005                                                                                                                                                                                                                                                                                                                                                                                                                                                                        reactor      trip upon                            recognition          of the LOFW.            If AFW              is VALVES                          LOCALLY    (LOFWw                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            initiated by                  2.46    hours              (147.6  minutes)        core          damage                                is manual                                    trip at 30s)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    avoided.          (Max                  core            temperature    node                of 1796F). This is past SG  dryout              as        allowed        by                  2BwFR-H.1            Attachment            B and                    supported      by                  multiple operator          interviews.
 
21 HEP  EDITS    MADE      SINCE    2022    BBW                FPIE    UPDATE
 
HFE  Description                                                                                                                                                                            HEPs                                                                                  Update                                                                                                                                                                                                                                                                                                                                                                                                                                            Edits 1.30.2024                                                                            2022 HEPs
~IG                                                                      FIRE      -          OPERATORS            FAIL TO                                                                                                                                2.SE-02                                                                                                                1.0                                                                                                      Tsw:      MAAP    Run                    BB_NoBF            _Scram_AutoC                                                (LOFW            with CLOSE      OPPOSITE        UNIT          AF005                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            no              AFW            and                  automatic                        plant  trip on                    low        SG    level)
VALVES                            LOCALLY        (LOFWTsw                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              indicates that the SGs will retain inventory              if SG  feed is used        for Fire) SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          restored by                the 39.9    minute            point.
FIRE      -          OPERATORS            FAIL TO                                                                                                                            2.SE-03  4                                                                                                        N/A                                                                                                  Tsw:        BB_NoBF            _Scram30E                                  includes      credit for a          manual ALIGN    AF  XTIE        FROM      OPPOSITE                                                                                                                                                                                                                                                                                                                                                                                                                          reactor        trip upon                            recognition            of the LOFW.            If AFW                is UNIT                (EXE        ONLY;      LOFWw                      30s                                                                                                                                                                                                                                                                                                                                                                                                                                                                              initiated by                  2.46    hours              (147.6    minutes)          core          damage                                    is trip)_SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  avoided.            (Max                  core          temperature        node                of 1796F). This is past  SG  dryout                  as        allowed        by                  2BwFR-H.1              Attachment              B and                  supported          by                  multiple operator              interviews.
~IG                                                                    FIRE      -          OPERATORS            FAIL TO                                                                                                                          6.6E-02                                                                              7.0E-02                                                                      Tsw:      MAAP    Run                    BB_NoBF            _Scram_AutoC                                                (LOFWwith ALIGN    AF  XTIE        FROM      OPPOSITE                                                                                                                                                                                                                                                                                                                                                                                                                                                            no              AFW            and                  automatic                        plant  trip on                    low        SG    level)
UNIT                (EXE        ONLY;      LOFWTsw                        used                                                                                                                                                                                                                                                                                                                                                                                                                                      indicates that the SGs will retain inventory              if SG  feed is for Fire) SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      restored by                  the 39.9    minute            point.
FIRE      -          OPERATORS            FAIL TO                                                                                                                          6.7E-03                                                                                                              N/A                                                                                                    Tsw:      BB_NoBF            _Scram30E                                  includes      credit for a        manual OPEN  AF005      VALVES                          (LOCALLY                                                                                                                                                                                                                                                                                                                                                                                                                                          reactor        trip upon                            recognition            of the LOFW.            If AFW              is FAIL AIR;        LOFWw                        30s trip)_SOP                                                                                                                                                                                                                                                                                                                                                                                                                                              initiated by                  2.46    hours              (147.6      minutes)          core          damage                                is avoided.            (Max                  core          temperature          node                of 1796F). This is I                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                past  SG  dryout              as        allowed          by                  2BwFR-H.1              Attachment              B and                  supported          by                  multiple operator              interviews.
 
FIRE      -          OPERATORS            FAIL TO                                                                                                                            1.7E-02                                                                                                        N/A                                                                                                  Tsw:      BB_NoBF            _Scram30E                                  includes      credit for a          manual OPEN  AF005      VALVES                        (LOCALLY                                                                                                                                                                                                                                                                                                                                                                                                                                          reactor        trip upon                            recognition            of the LOFW.            If AFW              is FAIL AIR;        LOFWw                        30s trip)_SOP                                                                                                                                                                                                                                                                                                                                                                                                                                              initiated by                2.46    hours              (147.6    minutes)          core          damage                                  is avoided.            (Max                  core          temperature        node                  of 1796F). This is 1                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          past  SG  dryout                as        allowed        by                  2BwFR-H.1              Attachment              B and                  supported        by                  multiple operator            interviews.
 
'.IG                                                                          FIRE      -          OPERATORS            FAIL TO                                                                                                                            5.2E-02                                                                                  2.8E-01                                                                      Tsw:        MAAP    Run                    BB_NoBF            _Scram_AutoC                                                  (LOFW            with OPEN    AF005        VALVES                        (LOCALLY                                                                                                                                                                                                                                                                                                                                                                                                                                                                              no              AFW            and                  automatic                        plant  trip on                  low        SG    level)
FAIL AIR;        LOFWTsw                          used        for                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              indicates that the SGs will retain inventory              if SG  feed is Fire) SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  restored by                the 39.9    minute            point.
 
.7E-03  was                    used              in    FPRA    quantification.
 
22 HEP    EDITS    MADE    SINCE    2022  BBW                  FPIE  UPDATE
 
HFE    Description                                                                                                                                                                                              HEPs                                                                                      Update                                                                                                                                                                                                                                                                                                                                                                                                                                                              Edits 1.30.2024                                                                          2022 HEPs FIRE    -          OPS    FAILS  TO  START    MD                                                                2.2E-03    5                                                                                                            N/A                                                                                                Tsw:        BB_NoBF          _Scram30E                                includes      credit for a          manual AFW            PUMP              AFTER        FAILURE                      OF                                                                                                                                                                                                                                                                                                                                                                                                                                        reactor        trip upon                            recognition          of the LOFW.              If AFW                is DC  (LOFW              w          30s trip)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          initiated by                  2.46    hours              (147.6  minutes)          core            damage                                  is avoided.              (Max                  core          temperature      node                  of 1796F). This is past  SG  dry out            as          allowed          by                2BwFR-H          .1      Attachment              B and                    supported        by                  multiple operator            interviews.
ORIG                                            FIRE    -        OPS    FAILS  TO    START    MD                                                                          1.0E-02                                                                              9.5E-02                                                                  Tsw:        MAAP    Run                    BB_NoBF          _Scram_AutoC                                                    (LOFW            with AFW            PUMP              AFTER        FAILURE                      OF                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                no              AFW            and                  automatic                        plant trip on                  low          SG    level)
DC  (LOFW              Tsw        used            in  Fire)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                              indicates that the SGs will retain inventory              if SG  feed is restored by                  the 39.9  minute            point.
FIRE    -          OPERATORS            FAIL TO                                                                                                                                  1.1E-03                                                                                                          N/A                                                                                                Tsw:        BB_NoBF          _Scram30E                                  includes    credit for a          manual MANUALLY                      START AF    PUMPS                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  reactor      trip upon                          recognition          of the LOFW.              If AFW              is FROM    CR    (LOFW                w        30s trip)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                initiated by                  2.46  hours              (147.6  minutes)          core            damage                                    is avoided.              (Max                  core          temperature      node                  of 1796F). This is past  SG  dryout                as          allowed        by                  2BwFR-H.1              Attachment            B and                  supported        by                  multiple operator            interviews.
RIG                                                                      FIRE    -          OPERATORS            FAIL TO                                                                                                                                  1.5E-03                                                                          4.9E-03                                                                    Tsw:      MAAP    Run                      BB_NoBF          _Scram_AutoC                                                  (LOFW            with MANUALLY                      START AF    PUMPS                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            no              AFW            and                  automatic                        plant trip on                  low        SG    level)
FROM      CR    (LOFW              Tsw      used            in                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    indicates that the SGs will retain inventory              if SG  feed is Fire) SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                restored by                  the 39.9  minute          point.
FIRE    -          OPERATORS            FAIL                                                                                                                                                                                7.0E-04                                                                                                            NIA                                                                                            Tsw:        MAAP    run              BB_LatestBF _Scram_30A,                                              indicates that RECOGNIZE            THE    CUE                  TO                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              the latest time for B&F  to  prevent core            damage                              with a SECONDARY              COOLING      (LOFW              w                                                                                                                                                                                                                                                                                                                                                                                                                                    manual                                      plant trip at  30  seconds                          and                  without    SG  feed is 30s trip)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            71.4    minutes.      After this time, RCS    injection flow cannot prevent core          damage                            when                    the bleed  path    is opened.
RIG                                                                      FIRE    -          OPERATORS            FAIL                                                                                                                                                                                  8.5E-03                                                                            8.3E-03                                                                      Tsw:        MAAP    Run                    BB_NoBF          _Scram_AutoC                                                (LOFWwith RECOGNIZE          THE    CUE                  TO                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        no              AFW            and                  automatic                        plant trip on                  low        SG    level)
SECONDARY              COOLING      (LOFW                                                                                                                                                                                                                                                                                                                                                                                                                                                                indicates that the SGs will retain inventory              if SG    feed is Tsw      used          for Fire) SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  restored by                  the 39.9  minute            point.
 
,.2E-02 was                  used                in  FPRA      quantification.
 
23 HEP    EDITS    MADE      SINCE  2022  BBW                  FPIE    UPDATE
 
HFE Description                                                                                                                                                                                                      HEPs                                                                                    Update                                                                                                                                                                                                                                                                                                                                                                                                                                                                        Edits 1.30.2024                                                                              2022 HEPs FIRE  -          OPERATORS        FAIL TO                                                                                                                                6.7E-03 6                                                                                                                N/A                                                                                                  Tsw:      BB_NoBF          _Scram30E                                includes  credit for a          manual RESTORE    ALTERNATE                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      reactor      trip upon                              recognition        of the LOFW.              If AFW              is FEEDWATER              (EXE          ONLY;    LOFW                                                                                                                                                                                                                                                                                                                                                                                                                                                                      initiated by                  2.46    hours              (147.6  minutes)        core          damage                                    is w        30s trip)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            avoided.            (Max                  core          temperature    node                  of 1796F). This is past  SG  dryout                as        allowed      by                  2BwFR-H.1          Attachment              B and                    supported      by                  multiple operator          interviews.
HIG                                                              FIRE  -          OPERATORS        FAIL TO                                                                                                                                                  3.SE-02                                                                          4.5E-02                                                                    Tsw:      MMP    Run                      BB_NoBF          _Scram_AutoC                                            (LOFWwith RESTORE    ALTERNATE                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                no              AFW            and                  automatic                          plant trip on                    low        SG    level)
FEEDWATER              (EXE          ONLY;    LOFW                                                                                                                                                                                                                                                                                                                                                                                                                                                                indicates that the SGs will retain inventory              if SG  feed is Tsw      used          in  Fire) SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  restored by                  the 39.9    minute          point.
FIRE    -          OPS  FAILS  TO    OPEN    PZR                                                                              2.SE-02                                                                                                                  N/A                                                                                                  Tsw:          In            order to  avoid          core          damage,                                feed and                    bleed PORVS                    FOR    B/F  COOLING      (EXE                                                                                                                                                                                                                                                                                                                                                                                                                                                        would                  have          to    be            initiated by                    71.4  minutes            (Tsw)    per ONLY;    LOFWw                    30s  trip; NO    Pe                                                                                                                                                                                                                                                                                                                                                                                                                              BBW          MMP    run                BB_LatestBF _Scram_30A.
rec)              SOP IG                                                                                                FIRE  -          OPS  FAILS  TO    OPEN    PZR                                                                              2.SE-02                                                                                2.SE-02                                                                Tsw:          In          order to  avoid          core          damage,                              bleed and                  feed PORVS                    FOR    B/F    COOLING      (EXE                                                                                                                                                                                                                                                                                                                                                                                                                                                        would                  have          to  be            initiated by                      30  minutes          (Tsw)    per BBW ONLY;    LOFWTsw;                              NO  Pe                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            MAAP    run              BB0007c          (LOFW            with no              AFW            and                  automatic recovery)                              SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              plant trip on                  low          SG    level).
FIRE  -          OPS  FAILS TO  OPEN    PZR                                                                        2.4E-04                                                                                                                N/A                                                                                                  Tsw:          In          order to  avoid          core          damage,                              feed and                    bleed PORVS                    FOR    B/F    COOLING      (EXE                                                                                                                                                                                                                                                                                                                                                                                                                                              would                    have          to  be            initiated by                    71.4  minutes          (Tsw)    per ONLY,    LOFWw                      30s trip, Pe                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              BBW          MMP  run                BB_LatestBF _Scram_30A.
Recovery)                                    SOP
:IG                                                                                    FIRE  -          OPS  FAILS TO  OPEN    PZR                                                                        4.2E-03                                                                              4.2E-03                                                                    Tsw:          In            order to  avoid          core          damage,                                bleed and                  feed PORVS                  FOR    B/F  COOLING      (EXE                                                                                                                                                                                                                                                                                                                                                                                                                                              would                    have        to  be            initiated by                    30  minutes          (Tsw)      per BBW ONLY,    LOFW            Tsw,        Pe                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        MMP  run              BB0007c          (LOFW            with no              AFW            and                  automatic Recovery)                                    SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                plant trip on                    low        SG    level).
FIRE    -        OPERATORS          FAIL TO                                                                                                                                        1.0E-02                                                                                                                    NIA                                                                                                  Tsw:          In            order to  avoid          core          damage,                              feed and                    bleed INITIATE  SI      FOR    BLEED  AND                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          would                  have          to  be            initiated by                  71.4  minutes            (Tsw)    per FEED    COOLING    (EXE        ONLY:                                                                                                                                                                                                                                                                                                                                                                                                                                                                    BBW          MMP    run                BB_LatestBF _Scram_30A.
LOFW            w          30s trip, NO    Pe    rec)            SOP
 
.4E-02  was                      used            in  FPRA    quantification.
 
24 HEP  EDITS  MADE      SINCE    2022    BBW                  FPIE    UPDATE
 
HFE  Description                                                                                                                                                                                  HEPs                                                                                  Update                                                                                                                                                                                                                                                                                                                                                                                                                                                      Edits 1.30.2024                                                                        2022 HEPs
;                                                                                                            FIRE    -        OPERATORS        FAIL TO                                                                                                                                      1.0E-02                                                                              1.0E-02                                                                    Tsw:          In          order to  avoid          core          damage,                                bleed  and                  feed INITIATE    SI      FOR    BLEED AND                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            would                    have          to    be            initiated by                  30  minutes            (Tsw)    per BBW FEED    COOLING    (EXE      ONLY:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  MAAP    run              BB000?c        (LOFW              with no              AFW            and                  automatic LOFW              Tsw      used          in  Fire, NO    Pe                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  plant trip on                    low        SG    level).
rec)              SOP FIRE    -          OPERATORS        FAIL TO                                                                                                                                    1.5E-04                                                                                                          N/A                                                                                                    Tsw:          In          order to  avoid          core            damage,                              feed and                    bleed INITIATE    SI    FOR    BLEED AND                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            would                    have          to    be            initiated by                    71.4  minutes          (Tsw)    per FEED    COOLING      (EXE      ONLY,                                                                                                                                                                                                                                                                                                                                                                                                                                                        BBW            MAAP  run              BB_LatestBF _Scram_30A.
LOFW              w        30s trip, Pe  RECV)                            SOP


~                                                                                                                  FIRE    -          OPERATORS       FAIL TO                                                                                                                                     1.6E-03                                                                         1.6E-03                                                                        Tsw:         In          order to  avoid          core            damage,                                bleed  and                   feed INITIATE    SI      FOR      BLEED AND                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            would                  have          to  be          initiated by                     30  minutes           (Tsw)      per BBW FEED    COOLING      (EXE      ONLY,                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    MAAP   run              BB0007c          (LOFW             with no               AFW             and                   automatic LOFW             Tsw,          Pe  RECV)                           SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          plant trip on                   low       SG   level).
HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update Edits HEPs OPERATORS FAIL TO EXECUTE 2.5E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual AF CROSSTIE FROM OPPOSITE reactor trip upon recognition of the LOFW. If AFW is UNIT (EXE ONLY; LOFWw 30s initiated by 2.46 hours (147.6 minutes) core damage is trip)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
3 OPERATORS FAIL TO EXECUTE 2.1 E-02 7.0E-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFWwith AF CROSSTIE FROM OPPOSITE no AFW and automatic plant trip on low SG level)
UNIT (EXE ONLY; LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.
OPERATORS FAIL TO OPEN 4.0E-02 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual AF005 VALVES (LOCALLY FAIL reactor trip upon recognition of the LOFW. If AFW is AIR; LOFW w 30s trip)_SDP initiated by 2.46 hours (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
~
OPERATORS FAIL TO OPEN 4.1 E-02 9.7E-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with J
AF005 VALVES (LOCALLY FAIL no AFW and automatic plant trip on low SG level)
AIR; LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.
OPERATOR FAILS TO START 1.SE-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual MOTOR-DRIVEN AFW PUMP reactor trip upon recognition of the LOFW. If AFW is AFTER FAILURE OF DC (LOFW w initiated by 2.46 hours (147.6 minutes) core damage is 30s trip)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
RIG OPERATOR FAILS TO START 7.SE-03 2.SE-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with MOTOR-DRIVEN AFW PUMP no AFW and automatic plant trip on low SG level)
AFTER FAILURE OF DC indicates that the SGs will retain inventory if SG feed is (LOFW) SOP restored by the 39.9 minute point.
19


25
HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update Edits HEPs OPERATORS FAIL TO LOCALLY 2.3E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual START B AUXILIARY reactor trip upon recognition of the LOFW. If AFW is FEEDWATER PUMP (LOFW w 30s initiated by 2.46 hours (147.6 minutes) core damage is trip)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
,al      Model          Conservatisms nements                      have            been                        identified but          were      not            pursued                  in  the model            used          to    generate        SOP  results. These  refinements are md            Table          4.2-2,    with the Fussel Vesely              metrics associated              with the refinement to  show                  relative importance                        and                       potential
~IG OPERATORS FAIL TO LOCALLY 9.6E-03 1.5E-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with START B AUXILIARY no AFW and automatic plant trip on low SG level)
~d        risk.
FEEDWATER PUMP (LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.
OPERATORS FAIL TO MANUALLY 5.4E-04 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual START AF PUMPS FROM CR reactor trip upon recognition of the LOFW. If AFW is (LOFWw 30s trip)_SDP initiated by 2.46 hours (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
RIG OPERATORS FAIL TO MANUALLY 8.7E-04 1.7E-03 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with START AF PUMPS FROM CR no AFW and automatic plant trip on low SG level)
(LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.
OPERATORS FAIL RECOGNIZE 8.1 E-04 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual THE LOSS OF SECONDARY reactor trip upon recognition of the LOFW. If AFW is COOLING (COGNITIVE ONLY; initiated by 2.46 hours (147.6 minutes) core damage is LOFW w 30s trip_no AF)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
IIG OPERATORS FAIL RECOGNIZE 2.2E-03 3.3E-03 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with THE LOSS OF SECONDARY no AFW and automatic plant trip on low SG level)
COOLING (COGNITIVE ONLY; indicates that the SGs will retain inventory if SG feed is LOFW) SOP restored by the 39.9 minute point.
20


Table              4.2-1:       FPIE  Additional        Model      Conservatisms                                with Estimated  Delta Risk Reductions
HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update Edits HEPs OPERATORS FAIL TO RESTORE 1.0E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual ALTERNATE FEEDWATER (EXE reactor trip upon recognition of the LOFW. If AFW is ONLY; LOFWw 30s trip)_SDP initiated by 2.46 hours (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
)nservatisms                                                                                                                                                                                                                                                                                                                                                                                                                            Exposure                                        Period  1 Risk Reduction                                                                                                Exposure                                    Period    2  Risk Reduction
~IG OPERATORS FAIL TO RESTORE 1.0E-02 3.6E-02 Tsw: MMP Run BB_NoBF _Scram_AutoC (LOFW with ALTERNATEFEEDWATER(EXE no AFW and automatic plant trip on low SG level)
) AF    pump                          on                            U1                        not          available        due                                                                                                                                                                                                                                                                                                                                                          0.15%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    1%
ONLY; LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.
ance,                                can                                be            removed                    since    there luring exposure                            period.
OPERATORS FAIL TO EXECUTE 2.4E-04 N/A Tsw: MMP run BB_LatestBF _Scram_30A, indicates that TO OPEN PZR PORVS FOR B/F the latest time for B&F to prevent core damage with a COOLING (EXE ONLY; LOFWw manual plant trip at 30 seconds and without SG feed is 30s trip) SOP 71.4 minutes.
:onservative        value          of 0.1      for pre-                                                                                                                                                                                                                                                                                                                                                                                                                                                       1%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        N/A system,           lower  value              applicable    for 1/o,  assume                            a           reduction              of a          factor  of
OPERATORS FAIL TO EXECUTE 4.2E-03 4.2E-03 Tsw: In order to avoid core damage, bleed and feed TO OPEN PZR PORVS FOR B/F would have to be initiated by 30 minutes (Tsw) per BBW COOLING (EXE ONLY; MMP run BB0007c (LOFW with no AFW and automatic LOFW) SOP plant trip on low SG level).
:ts a            bounding                                      value            applicable    to   all
OPERATORS FAIL TO INITIATE SI 1.5E-04 NIA Tsw: MMP run BB_LatestBF _Scram_30A, indicates that FOR BLEED AND FEED the latest time for B&F to prevent core damage with a COOLING (EXE ONLY; LOFWw manual plant trip at 30 seconds and without SG feed is 30s trip) SOP 71.4 minutes.
: equipment,               not          the specific s SOP   (MH  pump                        to   S/G,     not Jattery chargers        and                           HH    pump                    for                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   '
OPERATORS FAIL TO INITIATE SI 1.6E-03 1.6E-03 Tsw: In order to avoid core damage, bleed and feed FOR BLEED AND FEED would have to be initiated by 30 minutes (Tsw) per BBW COOLING (EXE ONLY; MAAP run BB0007c (LOFW with no AFW and automatic LOFW) SOP plant trip on low SG level).
FIRE - OPERATORS FAIL TO 1.7E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual CLOSE OPPOSITE UNIT AF005 reactor trip upon recognition of the LOFW. If AFW is VALVES LOCALLY (LOFWw initiated by 2.46 hours (147.6 minutes) core damage is manual trip at 30s)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
21


k reduction                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  1%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                1%
HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update Edits HEPs
~IG FIRE - OPERATORS FAIL TO 2.SE-02 1.0 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with CLOSE OPPOSITE UNIT AF005 no AFW and automatic plant trip on low SG level)
VALVES LOCALLY (LOFWTsw indicates that the SGs will retain inventory if SG feed is used for Fire) SOP restored by the 39.9 minute point.
FIRE - OPERATORS FAIL TO 2.SE-034 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual ALIGN AF XTIE FROM OPPOSITE reactor trip upon recognition of the LOFW. If AFW is UNIT (EXE ONLY; LOFWw 30s initiated by 2.46 hours (147.6 minutes) core damage is trip)_SOP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
~IG FIRE - OPERATORS FAIL TO 6.6E-02 7.0E-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFWwith ALIGN AF XTIE FROM OPPOSITE no AFW and automatic plant trip on low SG level)
UNIT (EXE ONLY; LOFWTsw used indicates that the SGs will retain inventory if SG feed is for Fire) SOP restored by the 39.9 minute point.
FIRE - OPERATORS FAIL TO 6.7E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual OPEN AF005 VALVES (LOCALLY reactor trip upon recognition of the LOFW. If AFW is FAIL AIR; LOFWw 30s trip)_SOP initiated by 2.46 hours (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is I
past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
FIRE - OPERATORS FAIL TO 1.7E-02 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual OPEN AF005 VALVES (LOCALLY reactor trip upon recognition of the LOFW. If AFW is FAIL AIR; LOFWw 30s trip)_SOP initiated by 2.46 hours (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is 1
past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
'.IG FIRE - OPERATORS FAIL TO 5.2E-02 2.8E-01 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with OPEN AF005 VALVES (LOCALLY no AFW and automatic plant trip on low SG level)
FAIL AIR; LOFWTsw used for indicates that the SGs will retain inventory if SG feed is Fire) SOP restored by the 39.9 minute point.
.7E-03 was used in FPRA quantification.
22


fable        4.2-2:       FPRA      Additional        Model      Conservatisms                                  with Estimated    Delta Risk Reductions
HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update Edits HEPs FIRE - OPS FAILS TO START MD 2.2E-035 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual AFW PUMP AFTER FAILURE OF reactor trip upon recognition of the LOFW. If AFW is DC (LOFW w 30s trip)_SDP initiated by 2.46 hours (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dry out as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
)nservatisms                                                                                                                                                                                                                                                                                                                                                                                                                                Exposure                                        Period  1 Risk Reduction                                                                                                Exposure                                      Period    2  Risk Reduction for Exposure                          Period 2,      although              it is                                                                                                                                                                                                                                                                                                                                 N/A                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  10%
ORIG FIRE - OPS FAILS TO START MD 1.0E-02 9.5E-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with AFW PUMP AFTER FAILURE OF no AFW and automatic plant trip on low SG level)
np            could                  have            run                 for some                      length and                     JHEPs  for AF    related actions.
DC (LOFW Tsw used in Fire)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.
FIRE - OPERATORS FAIL TO 1.1E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual MANUALLY START AF PUMPS reactor trip upon recognition of the LOFW. If AFW is FROM CR (LOFW w 30s trip)_SDP initiated by 2.46 hours (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
RIG FIRE - OPERATORS FAIL TO 1.5E-03 4.9E-03 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with MANUALLY START AF PUMPS no AFW and automatic plant trip on low SG level)
FROM CR (LOFW Tsw used in indicates that the SGs will retain inventory if SG feed is Fire) SDP restored by the 39.9 minute point.
FIRE - OPERATORS FAIL 7.0E-04 NIA Tsw: MAAP run BB_LatestBF _Scram_30A, indicates that RECOGNIZE THE CUE TO the latest time for B&F to prevent core damage with a SECONDARY COOLING (LOFW w manual plant trip at 30 seconds and without SG feed is 30s trip)_SDP 71.4 minutes. After this time, RCS injection flow cannot prevent core damage when the bleed path is opened.
RIG FIRE - OPERATORS FAIL 8.5E-03 8.3E-03 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFWwith RECOGNIZE THE CUE TO no AFW and automatic plant trip on low SG level)
SECONDARY COOLING (LOFW indicates that the SGs will retain inventory if SG feed is Tsw used for Fire) SDP restored by the 39.9 minute point.
,.2E-02 was used in FPRA quantification.
23


26 fable          4.2-2:     FPRA      Additional            Model      Conservatisms                              with Estimated    Delta Risk Reductions
HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update Edits HEPs FIRE - OPERATORS FAIL TO 6.7E-036 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual RESTORE ALTERNATE reactor trip upon recognition of the LOFW. If AFW is FEEDWATER (EXE ONLY; LOFW initiated by 2.46 hours (147.6 minutes) core damage is w 30s trip)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
)nservatisms                                                                                                                                                                                                                                                                                                                                                                                                                                      Exposure                                    Period    1 Risk Reduction                                                                                                Exposure                                      Period  2  Risk Reduction
HIG FIRE - OPERATORS FAIL TO 3.SE-02 4.5E-02 Tsw: MMP Run BB_NoBF _Scram_AutoC (LOFWwith RESTORE ALTERNATE no AFW and automatic plant trip on low SG level)
* pump                        could                have             operated            for                                                                                                                                                                                                                                                                                                                                                                                                  10%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  NIA J  1.88    hour              demonstrated                          run               time
FEEDWATER (EXE ONLY; LOFW indicates that the SGs will retain inventory if SG feed is Tsw used in Fire) SOP restored by the 39.9 minute point.
~            Period 1.     Improved                  HEPs  and tions.
FIRE - OPS FAILS TO OPEN PZR 2.SE-02 N/A Tsw: In order to avoid core damage, feed and bleed PORVS FOR B/F COOLING (EXE would have to be initiated by 71.4 minutes (Tsw) per ONLY; LOFWw 30s trip; NO Pe BBW MMP run BB_LatestBF _Scram_30A.
rec) SOP IG FIRE - OPS FAILS TO OPEN PZR 2.SE-02 2.SE-02 Tsw: In order to avoid core damage, bleed and feed PORVS FOR B/F COOLING (EXE would have to be initiated by 30 minutes (Tsw) per BBW ONLY; LOFWTsw; NO Pe MAAP run BB0007c (LOFW with no AFW and automatic recovery) SOP plant trip on low SG level).
FIRE - OPS FAILS TO OPEN PZR 2.4E-04 N/A Tsw: In order to avoid core damage, feed and bleed PORVS FOR B/F COOLING (EXE would have to be initiated by 71.4 minutes (Tsw) per ONLY, LOFWw 30s trip, Pe BBW MMP run BB_LatestBF _Scram_30A.
Recovery) SOP
:IG FIRE - OPS FAILS TO OPEN PZR 4.2E-03 4.2E-03 Tsw: In order to avoid core damage, bleed and feed PORVS FOR B/F COOLING (EXE would have to be initiated by 30 minutes (Tsw) per BBW ONLY, LOFW Tsw, Pe MMP run BB0007c (LOFW with no AFW and automatic Recovery) SOP plant trip on low SG level).
FIRE - OPERATORS FAIL TO 1.0E-02 NIA Tsw: In order to avoid core damage, feed and bleed INITIATE SI FOR BLEED AND would have to be initiated by 71.4 minutes (Tsw) per FEED COOLING (EXE ONLY:
BBW MMP run BB_LatestBF _Scram_30A.
LOFW w 30s trip, NO Pe rec) SOP
.4E-02 was used in FPRA quantification.
24


s of MFW            and                       reactor        trip for all fire                                                                                                                                                                                                                                                                                                          10%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  10%
HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update Edits HEPs FIRE - OPERATORS FAIL TO 1.0E-02 1.0E-02 Tsw: In order to avoid core damage, bleed and feed INITIATE SI FOR BLEED AND would have to be initiated by 30 minutes (Tsw) per BBW FEED COOLING (EXE ONLY:
Jtion of those  to  which          a          reactor          trip
MAAP run BB000?c (LOFW with no AFW and automatic LOFW Tsw used in Fire, NO Pe plant trip on low SG level).
'or      a              U1                  or      U2                trip -                   a            risk reduction the ASM-BW-009,                           Rev.       2, rhe reduction            of risk due          to Jment            with unknown                                                          location,                     no
rec) SOP FIRE - OPERATORS FAIL TO 1.5E-04 N/A Tsw: In order to avoid core damage, feed and bleed INITIATE SI FOR BLEED AND would have to be initiated by 71.4 minutes (Tsw) per FEED COOLING (EXE ONLY, BBW MAAP run BB_LatestBF _Scram_30A.
~ss specific basis      for credit is ler of a              10%  risk reduction              from        the duction                    due          to   incorporation                          of cable xder      of half this value.              However,                   the P configuration                      which          is driven by
LOFW w 30s trip, Pe RECV) SOP
~moval                would                     be            expected              to     be
~
FIRE - OPERATORS FAIL TO 1.6E-03 1.6E-03 Tsw: In order to avoid core damage, bleed and feed INITIATE SI FOR BLEED AND would have to be initiated by 30 minutes (Tsw) per BBW FEED COOLING (EXE ONLY, MAAP run BB0007c (LOFW with no AFW and automatic LOFW Tsw, Pe RECV) SOP plant trip on low SG level).
25


d and                        Feed    requires 1 SI      pump                         and                                                                                                                                                                                                                                                                                                                                                                                                                            NIA                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            3%
,al Model Conservatisms nements have been identified but were not pursued in the model used to generate SOP results. These refinements are md Table 4.2-2, with the Fussel Vesely metrics associated with the refinement to show relative importance and potential
lpport a           change                                    in  success                      criteria V.                  Quantification      is based                      on                    the Ji res 1 SI      pump                     and                       2    PO RVs                for tivity indicated that the reduction                     in was                    small, ~1 % for Exposure are      expected            for Exposure                             Period 2.
~d risk.
Table 4.2-1: FPIE Additional Model Conservatisms with Estimated Delta Risk Reductions
)nservatisms Exposure Period 1 Risk Reduction Exposure Period 2 Risk Reduction
) AF pump on U1 not available due 0.15%
1%
ance, can be removed since there luring exposure period.
:onservative value of 0.1 for pre-1%
N/A system, lower value applicable for 1/o, assume a reduction of a factor of
:ts a bounding value applicable to all
: equipment, not the specific s SOP (MH pump to S/G, not Jattery chargers and HH pump for k reduction 1%
1%
fable 4.2-2: FPRA Additional Model Conservatisms with Estimated Delta Risk Reductions
)nservatisms Exposure Period 1 Risk Reduction Exposure Period 2 Risk Reduction for Exposure Period 2, although it is N/A 10%
np could have run for some length and JHEPs for AF related actions.
26


27 fable         4.2-2:       FPRA     Additional       Model       Conservatisms                                 with Estimated     Delta Risk Reductions
fable 4.2-2: FPRA Additional Model Conservatisms with Estimated Delta Risk Reductions  
  >nservatisms                                                                                                                                                                                                                                                                                                                                                                                                                       Exposure                                       Period 1 Risk Reduction                                                                                                 Exposure                                     Period   2 Risk Reduction failure data.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               10%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     N/A
)nservatisms Exposure Period 1 Risk Reduction Exposure Period 2 Risk Reduction
* pump could have operated for 10%
NIA J 1.88 hour demonstrated run time
~ Period 1. Improved HEPs and tions.
s of MFW and reactor trip for all fire 10%
10%
Jtion of those to which a reactor trip
'or a U1 or U2 trip - a risk reduction the ASM-BW-009, Rev. 2, rhe reduction of risk due to Jment with unknown location, no
~ss specific basis for credit is ler of a 10% risk reduction from the duction due to incorporation of cable xder of half this value. However, the P configuration which is driven by
~moval would be expected to be d and Feed requires 1 SI pump and NIA 3%
lpport a change in success criteria V. Quantification is based on the Ji res 1 SI pump and 2 PO RVs for tivity indicated that the reduction in was small, ~1 % for Exposure are expected for Exposure Period 2.
27


  .EX   system,           currently       0.1     value         with                                                                                                                                                                                                                                                                                                                                                                           4%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       N/A i       Period 1.
fable 4.2-2: FPRA Additional Model Conservatisms with Estimated Delta Risk Reductions
>nservatisms Exposure Period 1 Risk Reduction Exposure Period 2 Risk Reduction failure data.
10%
N/A
.EX system, currently 0.1 value with 4%
N/A i Period 1.  
) AF pump on U1 not available due 10%
17%
ance, can be removed since there luring exposure period.
:onservative value of 0.1 for pre-9%
N/A system, lower value applicable for o, assume a reduction of a factor of
:ts a bounding value applicable to all
: equipment, not the specific s SOP (MH pump to S/G, not Jattery chargers and HH pump for
,corporate EPRI realism NUREGs, 10%
10%
:G-2233 ites use of the AF crosstie after a potentially not trivial, not yet quantified potentially not trivial, not yet quantified llow credit for an emergency diesel
> pump to be donated to Unit 2 via imps supply the Unit 1 AF needs, ind their support systems are not probability for non-severe panel 5%
6%
rol room fires 28


) AF  pump                          on                            U1                      not          available        due                                                                                                                                                                                                                                                                                                                                                                                            10%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          17%
fable 4.2-2: FPRA Additional Model Conservatisms with Estimated Delta Risk Reductions Jnservatisms Exposure Period 1 Risk Reduction Exposure Period 2 Risk Reduction non-severe panel scenarios,
ance,                              can                                  be            removed                since    there luring exposure                              period.
-2.5%  
:onservative        value          of 0.1       for pre-                                                                                                                                                                                                                                                                                                                                                                                                                                                     9%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       N/A system,            lower  value          applicable    for o,        assume                              a            reduction          of a          factor  of
-2.5%
:ts a            bounding                                          value          applicable    to  all
f spurious operations. Max increase 29
: equipment,                not          the specific s SOP  (MH    pump                        to  S/G,    not Jattery chargers        and                          HH    pump                    for


,corporate                            EPRI    realism NUREGs,                                                                                                                                                                                                                                                                                                                                                                                                          10%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          10%
1ity Calculations and External Hazards Extrapolation 30
:G-2233 ites use          of the AF  crosstie after a                                                                                                  potentially not          trivial, not          yet  quantified                                potentially not          trivial, not          yet  quantified llow credit for an                      emergency                                diesel
> pump                      to    be            donated                          to    Unit    2  via imps supply          the Unit      1 AF    needs, ind  their support systems        are      not


probability  for non-severe                            panel                                                                                                                                                                                                                                                                                                                                                                                                                                                                                5%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              6%
3.64E*07 4.SSE-07 1.17E-07 1.03E-07
rol room                          fires
'i244E-07 1407E-07 2620E-07 H46E-07
)987E-07 l410E-07 t940E-07 l587E-07
'i408E-07 7170E-07 SDPcase ExptIme Fire Delta FPIE Delta Total CDF over Total LERF over CDF LERF CDF LERF Delta CDF exp Delta LERF exp SOP-1 105 1.0lE-05 1.llE-06 8.54E-06 2 47E-07 1.87E-05 5.39E-06 1.36E-06 3.90E-07 5DP-2 22 2.94E-05 3.16E-06 1.18E-05 3.38E-07 4.12E-05 2.49E-06 3.SOE-06 2.llE-07 Total risk over exposure period 7.BBE-06 6.0lE-07 SDP-2tor total exp time 127 2.94E-05 3.16E-06 l.18E-05 3.39E-07 4.12E-05 1.43E-05 3.50E-06 1.22E-06 AFPmp TOTAL TOTAL Failure DELTA DELTA DELTA DELTA DELTA DELTA H1ghW1nds, Tornado, Over NewCDF FlexHEP Prob Exp Time FCDF FLERF CDF LERF CDF
*127/365 LERF
*127/365 and SeIsmIc delta CDF exposure Total 6.30E-02 0.1 127 l.20E-06 l.30E-07 7.85E-07 2.21E-08 1.98E-06 6.91E-07 1.52E-07 5.29E-08 2.20E-07 2.20E-07 9.llE-07 6.30E-02 0.5 127 6.20E-06 6.50E*07 4.56E-06 1.31E-07 1.0BE-05 3.74E-06 7.BlE-07 2.72E-07 3.40E-07 3.40E-07 4.08E-06 6.30E-02 TRUE 127 1.16E-05 1.25E-06 9.20E-06 2.66E-07 2.08E-05 7.24E-06 1.52E-06 5.27E-07 5.00E-07 5.00E-07 7.74E-06 0.3 0.1 127 2.lOE-06 2.lOE-07 l.02E-06 2.84E-08 3.12E-06 1.09E-06 2.38E-07 8.29E-08 2.70E-07 2.70E-07 1.36E-06 0.3 0.5 127 9.40E-06 9.30E-07 5.09E-06 1.45E-07 1.45E-05 5.04E-06 1.0BE-06 3.74E-07 4.30E-07 4.30E-07 5.47E-06 03 TRUE 127 l.78E-05 l.BlE-06 l.OlE-05 2.90E-07 2.79E-05 9.70E-06 2.lOE-06 7.31E-07 6.30E-07 6.30E-07 l.03E-05 TRUE 0.1 127 3.BOE-06 3.BOE-07 1.39E-06 3.79E-08 5.19E-06 1.BOE-06 4.lBE-07 1.45E-07 4.lOE-07 4.lOE-07 2.21E-06 TRUE 0.5 127 1.49E-05 1.43E-06 5.89E-06 1.67E-07 2.0BE-05 7.23E-06 1.60E-06 5.56E-07 6.SOE-07 6.50E-07 7.BBE-06 TRUE TRUE 127 2.77E*05 2.67E*06 1.14E-05 3.25E-07 3.91E-05 1.36E-05 2.99E-06 1.04E-06 9.SOE-07 9.SOE-07 l.46E-05 TRUE 0.0534 127 l.OOE-06 l.lOE-07 2.59E-07 5.87E-09 1.26E-06 4.38E-07 1.16E-07 4.03E-08 3.BOE-07 3.BOE-07 8.lBE-07 FPIE LERF FIRECDF FIRELERF 0.063 0.3 TRUE 0.063 0.3 TRUE 0.063 0.3 TRUE 0.0534,:t)i,1,t:tY f°}'l,-*c,.\\.
2.0E*09 0.0534 J.~'1;:,r:;,i;{:-
'.'.:~..,:J'w,**
3.SE-07 0.0534}
3.BE-08 0.1 7.7E-09 9.9E-09 1.3E-08 0.1 4.2E-07 7.3E-07 13E-06 0.1 4.SE-08 7 3E-08 1.3E-07 0.5 4.6E-08 5.lE-08 5.BE-08 0.5 2.2E-06 3.3E-06 5.2E-06 0.5 2.3E-07 3.2E-07 5.0E-07 TRUE 9.3E-08 1.0E-07 1.lE-07 TRUE 4.0E-06 6.2E-06 9.6E-06 TRUE 4.3E-07 6.3E-07 9.3E-07 TOT AL LERF over exp Total CDFoverexplncludlngexternal 0.063 0.3 TRUE 0.063 0.3 TRUE 0.0534 4.0E-08 0.0534 ::::h'/.:'
8.2E*07 0.1 5.3E*08 8.3E-08 1.SE-07 0.1 9.lE-07 1.4E-06 2.2E-06 0.5 2.7E-07 3.7E-07 5.6E-07 0.5 4.lE-06 5.5E-06 7.9E-06 TRUE 5.3E-07 7.3E-07 1.0E*06 TRUE 7.7E-06 1.0E-05 1.SE-05


28 fable          4.2-2:      FPRA        Additional          Model      Conservatisms                                  with Estimated    Delta Risk Reductions Jnservatisms                                                                                                                                                                                                                                                                                                                                                                                                      Exposure                                        Period    1 Risk Reduction                                                                                                Exposure                                      Period    2  Risk Reduction non-severe                          panel              scenarios,                                                                                                                                                                                                                                                                                                                                                                                                                                              -2.5%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    -2.5%
AF FTR External Events Extrapolation HEP TRUE 3.8E-07 0.1 2.2E-07 2.7E-07 4.lE-07 0.5 3.4E-07 4.3E-07 6.SE-07 TRUE 5.0E-07 6.3E-07 9.SE-07 The highlighted cells indicate values provided by the NRC in the initial choice letter. The values on the bottom right were used to extrapolate the values in the rest of the right column. Then, the value in the lower left was used as an anchor point, and the bottom middle value was calculated using linear interpolation. After the bottom row and right column were calculated, the extrapolation was then applied to the other values in the table.
f spurious              operations.                   Max                    increase


29 1ity Calculations                                      and                                External                    Hazards                      Extrapolation
Christensen, Andrew From:
 
Harden, Adam Sent:
30 SDPcase              ExptIme                                                              Fire Delta                                                                                          FPIE  Delta Total                                            CDF over          Total                                                LERF over CDF                                                      LERF                                              CDF                                                      LERF                                      Delta CDF      exp                                            Delta LERF    exp 3.64E*07                                                                                            SOP-1                                                                105            1.0lE-05            1.llE-06        8.54E-06                2 47E-07              1.87E-05          5.39E-06                  1.36E-06          3.90E-07 4.SSE-07                                                                                            5DP-2                                                                                                22              2.94E-05              3.16E-06              1.18E-05              3.38E-07                4.12E-05          2.49E-06                    3.SOE-06      2.llE-07 Total  risk over    exposure          period                                                                                                                                                                                                                                                                                                                                                                      7.BBE-06                                                                          6.0lE-07 1.17E-07 1.03E-07 SDP-2tor total exp time                                                                              127              2.94E-05              3.16E-06              l.18E-05              3.39E-07              4.12E-05          1.43E-05                3.50E-06            1.22E-06
Saturday, February 24, 2024 10:14 AM To:  
 
AFPmp                                                                                                                                                                                                                                                                                                                                                                                                                                                                        TOTAL                                                                                                        TOTAL Failure                                                                                                              DELTA                                  DELTA                                    DELTA                                    DELTA                                    DELTA                                                                                                          DELTA                                                                                                            H1ghW1nds,      Tornado,                    Over                              NewCDF FlexHEP          Prob                                                  Exp    Time              FCDF                                            FLERF                                      CDF                                                      LERF                                                CDF                                        *127/365          LERF                                    *127/365      and          SeIsmIc    delta CDF    exposure                Total
'i244E-07                                                            6.30E-02                                              0.1                                                127            l.20E-06            l.30E-07              7.85E-07                2.21E-08              1.98E-06          6.91E-07                1.52E-07          5.29E-08                                                                                            2.20E-07          2.20E-07                  9.llE-07 1407E-07                                                              6.30E-02                                                  0.5                                                127              6.20E-06              6.50E*07          4.56E-06              1.31E-07                1.0BE-05        3.74E-06              7.BlE-07        2.72E-07                                                                                            3.40E-07          3.40E-07                      4.08E-06 2620E-07                                                              6.30E-02                      TRUE                                                                    127              1.16E-05              1.25E-06            9.20E-06                2.66E-07                2.08E-05        7.24E-06                1.52E-06          5.27E-07                                                                                            5.00E-07            5.00E-07                      7 .74E-06 H46E-07                                                                                0.3                                                0.1                                                127            2.lOE-06            2.lOE-07          l.02E-06              2.84E-08              3.12E-06          1.09E-06                2.38E-07          8.29E-08                                                                                            2.70E-07          2.70E-07                      1.36E-06
)987E-07                                                                                0.3                                              0.5                                            127              9.40E-06              9.30E-07              5.09E-06                1.45E-07                1.45E-05          5.04E-06                  1.0BE-06        3.74E-07                                                                                        4.30E-07            4.30E-07                      5.47E-06 l410E-07                                                                                03                      TRUE                                                                    127            l.78E-05            l.BlE-06        l.OlE-05          2.90E-07                2.79E-05          9.70E-06                2.lOE-06        7.31E-07                                                                                            6.30E-07          6.30E-07                  l.03E-05 t940E-07                                                                TRUE                                                                0.1                                            127                3.BOE-06                3.BOE-07        1.39E-06              3.79E-08              5.19E-06          1.BOE-06          4.lBE-07          1.45E-07                                                                                    4.lOE-07        4.lOE-07                  2.21E-06 l587E-07                                                                TRUE                                                                    0.5                                            127              1.49E-05              1.43E-06              5.89E-06              1.67E-07                2.0BE-05        7.23E-06                1.60E-06            5.56E-07                                                                                                          6.SOE-07        6.50E-07                        7.BBE-06
'i408E-07                                                                TRUE                                        TRUE                                                                        127              2.77E*05            2.67E*06            1.14E-05              3.25E-07                3.91E-05          1.36E-05                2.99E-06          1.04E-06                                                                                                          9.SOE-07        9.SOE-07                l.46E-05 7170E-07                                                                TRUE                                        0.0534                                                  127                l.OOE-06      l.lOE-07          2.59E-07              5.87E-09                1.26E-06          4.38E-07                1.16E-07          4.03E-08                                                                                                          3.BOE-07        3.BOE-07                8.lBE-07
 
FPIE  LERF                                                                                                                                                                                                                                                                                                                                                              FIRECDF                                                                                                                                                                                                                                                                                                                                                                      FIRELERF 0.063                                                  0.3                        TRUE                                                                                                                                                                                                0.063                                                0.3                        TRUE                                                                                                                                                                                                    0.063                                                                                                                                      0.3                    TRUE 0.0534    ,:t)i,1,t:tY f°}'l,-*c,.\\.                            2.0E*09                                                                                          0.0534    J.~'1;:,r:;,i;{:-  '.'.:~ .. ,:J'w,**                                3.SE-07                                                                                    0.0534}                                                                                                                                                                                                                                                          3.BE-08 0.1                  7.7E-09                  9.9E-09                      1.3E-08                                                                                                                                  0.1                      4.2E-07                        7.3E-07                    13E-06                                                                                                                                  0.1                    4.SE-08                                                                                                    7  3E-08                  1.3E-07 0.5                  4.6E-08                5.lE-08                        5.BE-08                                                                                                                                0.5                        2.2E-06                      3.3E-06                        5.2E-06                                                                                                                              0.5                    2.3E-07                                                                                                  3.2E-07                  5.0E-07 TRUE                                      9.3E-08                    1.0E-07                    1.lE-07                                                                                                            TRUE                                              4.0E-06                        6.2E-06                        9.6E-06                                                                                                        TRUE                                          4.3E-07                                                                                                    6.3E-07                  9.3E-07
 
TOT AL LERF  over    exp                                                                                                                                                    Total  CDFoverexplncludlngexternal 0.063                                                  0.3                        TRUE                                                                                                                                                                                                0.063                                                0.3                        TRUE 0.0534                                                                                                                                                                4.0E-08                                                                                                0.0534      ::::h'/.:'                                                                                                      8.2E*07 0.1                  5.3E*08                8.3E-08                        1.SE-07                                                                                                                                0.1                    9.lE-07                    1.4E-06                        2.2E-06 0.5                    2.7E-07                  3.7E-07                      5.6E-07                                                                                                                                  0.5                    4.lE-06                      5.5E-06                        7.9E-06 TRUE                                        5.3E-07                  7.3E-07                      1.0E*06                                                                                                          TRUE                                            7.7E-06                      1.0E-05                        1.SE-05 External        Events Extrapolation HEP TRUE AF    FTR                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                3.8E-07 0.1                                                                                                                                                                                                                                                                                                                                                                                            2.2E-07                                                                                                                                                                                                                                                                                                                                                                                                                                                    2.7E-07                                                                                                                                                                                                                        4.lE-07 0.5                                                                                                                                                                                                                                                                                                                                                                                                3.4E-07                                                                                                                                                                                                                                                                                                                                                                                                                                    4.3E-07                                                                                                                                                                                                                                                                      6.SE-07 TRUE                                                                                                                                                                                                                                                                                                                                                                                                                                          5.0E-07                                                                                                                                                                                                                                                                                                                                                                                                                                          6.3E-07                                                                                                                                                                                                                                                              9.SE-07 The  highlighted cells indicate values        provided  by              the NRC    in the initial choice          letter. The  values        on                the bottom                        right were        used      to  extrapolate          the values          in the rest of the right column.                                Then,          the value            in the lower      left was                used          as          an                  anchor                          point,      and                the bottom                        middle value          was              calculated                using      linear interpolation.      After the bottom                      row              and                right column                                were      calculated,            the extrapolation                            was            then applied to the other values        in the table.
Christensen,       Andrew
 
From:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Harden,             Adam Sent:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Saturday,                         February                               24,   2024   10:14 AM To:                                                                                               Vanover,                                      Donald;                        Kolonauski,                          Lynn;                                Farradj, Usama;                                            Graven,                Ethan;        Christensen, Andrew


==Subject:==
==Subject:==
RE:       BW-SDP-006                 RO       Signatures
Vanover, Donald; Kolonauski, Lynn; Farradj, Usama; Graven, Ethan; Christensen, Andrew RE: BW-SDP-006 RO Signatures I, Adam Harden, sign BW-SDP-006 Rev. 0 as a qualified reviewer.
 
ADAM J. HARDEN Staff Engineer II i F: +'i a i1 c,,,dt~:... 1 C:.i) !G n s~ r: ! : uq tv~s. cc1n jensenhughes.com From: Vanover, Donald <DVanover@jensenhughes.com>
I,   Adam                       Harden,                       sign   BW-SDP-006                             Rev. 0 as           a         qualified reviewer.
Sent: Saturday, February 24, 2024 10:08 AM To: Kolonauski, Lynn <LKolonauski@jensenhughes.com>; Farradj, Usama <UFarradj@jensenhughes.com>; Graven, Ethan  
 
<EGraven@jensenhughes.com>; Christensen, Andrew <andrew.christensen@jensenhughes.com>; Harden, Adam  
ADAM       J. HARDEN Staff Engineer           II
<AHarden@jensenhughes.com>  
 
i F:     +'i a   i1 c, ,,dt~: ... 1 C:.i) !G n s~ r: ! : uq     tv~s. cc1n
 
jensenhughes.com
 
From:                     Vanover,                                         Donald                   <DVanover@jensenhughes.com>
Sent:           Saturday,                           February                                   24,   2024   10:08 AM To:               Kolonauski,                               Lynn                           <LKolonauski@jensenhughes.com>;                                                                                   Farradj, Usama                                       <UFarradj@jensenhughes.com>;                                                                       Graven,                   Ethan
<EGraven@jensenhughes.com>;                                                                   Christensen, Andrew                 <andrew.christensen@jensenhughes.com>;                                                                                       Harden,                 Adam
<AHarden@jensenhughes.com>


==Subject:==
==Subject:==
RE:       BW-SDP-006             RO     Signatures
RE: BW-SDP-006 RO Signatures I, Donald Vanover, sign BW-SDP-006 Rev. 0 as a qualified reviewer.
 
DONALD VANOVER Global Service Line Leader, Energy + Utilities 153 VVesl C,ay Street, Suite 400, West Chester, PA 19380 0: +1 42-4*-250-6852 i  
I,   Donald                       Vanover,                                         sign BW-SDP-006                             Rev. 0 as           a         qualified reviewer.
+1 4.34-4~~7-4372 dvanover@iensenhughes.com jensenhughes.com From: Kolonauski, Lynn <LKolonauski@iensenhughes.com>
 
Sent: Saturday, February 24, 2024 11:05 AM To: Farradj, Usama <UFarradi@iensenhughes.com>; Graven, Ethan <EGraven@iensenhughes.com>; Christensen, Andrew <andrew.christensen@iensenhughes.com>; Harden, Adam <AHarden@jensenhughes.com>; Vanover, Donald  
DONALD       VANOVER Global         Service Line   Leader,       Energy                 +   Utilities
<DVanover@jensenhughes.com>  
 
153   VVesl           C,ay                 Street, Suite 400,     West     Chester, PA   19380 0:       +1         42-4*-250-6852 i                         +1         4.34-4~~7-4372 dvanover@iensenhughes.com
 
jensenhughes.com
 
From:                       Kolonauski,                               Lynn                           <LKolonauski@iensenhughes.com>
Sent:         Saturday,                           February                                 24,   2024   11:05   AM To:               Farradj,   Usama                                     <UFarradi@iensenhughes.com>;                                                                         Graven,                 Ethan           <EGraven@iensenhughes.com>;                                                                 Christensen, Andrew                 <andrew.christensen@iensenhughes.com>;                                                                                           Harden,               Adam                     <AHarden@jensenhughes.com>;                                                                       Vanover,                                           Donald
<DVanover@jensenhughes.com>


==Subject:==
==Subject:==
RE:       BW-SDP-006             RO       Signatures
RE: BW-SDP-006 RO Signatures I, Lynn Kolonauski, sign BW-SDP-006 Rev. 0 as a qualified co-preparer.
 
LYNN KOLONAUSKI Senior Engineer Risk-Informed Engineering 158 West Gay Street, Suite 400 West Chesler, PA 19380 0 (484) 260-4737 1  
I,   Lynn                             Kolonauski,                                   sign BW-SDP-006                             Rev. 0 as           a         qualified co-preparer.
 
LYNN         KOLONAUSKI Senior       Engineer Risk-Informed           Engineering
 
158 West   Gay                   Street, Suite 400 West     Chesler, PA   19380 0                 (484)   260-4737 1
lkolonauski@iensenhughes.com
 
jensenhughes.com


From:                       Farradj,   Usama                                       <UFarradi@iensenhughes.com>
lkolonauski@iensenhughes.com jensenhughes.com From: Farradj, Usama <UFarradi@iensenhughes.com>
Sent:       Saturday,                             February                                 24,   2024   11:04   AM To:               Graven,                     Ethan           <EGraven@iensenhughes.com>;                                                                   Christensen, Andrew                 <andrew.christensen@iensenhughes.com>;
Sent: Saturday, February 24, 2024 11:04 AM To: Graven, Ethan <EGraven@iensenhughes.com>; Christensen, Andrew <andrew.christensen@iensenhughes.com>;
Kolonauski,                                 Lynn                           <LKolonauski@iensenhughes.com>;                                                                               Harden,                   Adam                     <AHarden@iensenhughes.com>;                                                                       Vanover,                                         Donald
Kolonauski, Lynn <LKolonauski@iensenhughes.com>; Harden, Adam <AHarden@iensenhughes.com>; Vanover, Donald  
<DVanover@jensenhughes.com>
<DVanover@jensenhughes.com>  


==Subject:==
==Subject:==
RE:       BW-SDP-006             RO     Signatures
RE: BW-SDP-006 RO Signatures I, Usama Farradj, sign BW-SDP-006 Rev. 0 as a qualified co-preparer.
 
USAMA FARRADJ Manager  
I,   Usama                                             Farradj,       sign BW-SDP-006                             Rev. 0 as         a         qualified co-preparer.
'.31 ufarradj@jensenhughes.com From: Graven, Ethan <EGraven@jensenhughes.com>
 
Sent: Saturday, February 24, 2024 8:03 AM To: Christensen, Andrew <andrew.christensen@jensenhughes.com>; Farradj, Usama <UFarradi@jensenhughes.com>;
USAMA                     FARRADJ Manager
Kolonauski, Lynn <LKolonauski@lensenhughes.com>; Harden, Adam <AHarden@iensenhughes.com>; Vanover, Donald  
 
<DVanover@jensenhughes.com>  
                          '.31 ufarradj@jensenhughes.com
 
From:                       Graven,                     Ethan           <EGraven@jensenhughes.com>
Sent:       Saturday,                             February                                 24,   2024   8:03   AM To:               Christensen, Andrew                 <andrew.christensen@jensenhughes.com>;                                                                                             Farradj,   Usama                                       <UFarradi@jensenhughes.com>;
Kolonauski,                                   Lynn                           <LKolonauski@lensenhughes.com>;                                                                             Harden,                   Adam                     <AHarden@iensenhughes.com>;                                                                         Vanover,                                         Donald
<DVanover@jensenhughes.com>


==Subject:==
==Subject:==
RE:       BW-SDP-006             RO     Signatures
RE: BW-SDP-006 RO Signatures I, Ethan Graven, sign BW-SDP-006 Rev Oas a qualified co-preparer.
: Thanks, ETHAN GRAVEN Manager, Midwest jensenhughes.com cmmECT WITH us Receive the latest company updates, industry news and free educational insights from our experts. Siqn-uo here From: Christensen, Andrew <andrew.christensen@jensenhughes.com>
Sent: Saturday, February 24, 2024 10:00 AM To: Graven, Ethan <EGraven@iensenhughes.com>; Farradj, Usama <UFarradi@ljensenhughes.com>; Kolonauski, Lynn
<LKolonauski@iensenhughes.com>; Harden, Adam <AHarden@jensenhughes.com>; Vanover, Donald 2


I,      Ethan              Graven,                    sign BW-SDP-006              Rev  Oas          a        qualified co-preparer.
<DVanover@jensenhughes.com>  
: Thanks, ETHAN      GRAVEN Manager,                        Midwest
 
jensenhughes.com
 
cmmECT                                  WITH            us Receive    the latest company                                                    updates,            industry    news                and                    free educational                          insights from      our            experts. Siqn-uo                    here
 
From:                      Christensen, Andrew                <andrew.christensen@jensenhughes.com>
Sent:        Saturday,                              February                                  24,  2024    10:00  AM To:                Graven,                      Ethan          <EGraven@iensenhughes.com>;                                                                      Farradj,    Usama                                        <UFarradi@ljensenhughes.com>;                                                          Kolonauski,                              Lynn
<LKolonauski@iensenhughes.com>;                                                                                    Harden,                  Adam                    <AHarden@jensenhughes.com>;                                                                        Vanover,                                            Donald
 
2
<DVanover@jensenhughes.com>


==Subject:==
==Subject:==
BW-SDP-OO6       RO     Signatures
BW-SDP-OO6 RO Signatures I, Andrew Christensen, sign BW-SDP-OO6 RO as a qualified co-preparer Andy Christensen (he/him/his)
 
Associate 1 0 South Wacker Drive, Suite 1300, Chicago, IL 60606 C: +1 847-257-5765 andrew.christensen(Q)iensenhuahes.com jensenhughes.com CONNECT WITH US Receive the latest company updates, industry news and free educational insights from our experts. Siem-up here 3
I,   Andrew                   Christensen, sign BW-SDP-OO6       RO       as           a       qualified co-preparer
 
Andy                         Christensen         (he/him/his)
Associate
 
1 0   South         Wacker                       Drive, Suite 1300,   Chicago,                   IL 60606 C:     +1       847-257-5765


andrew.christensen(Q)iensenhuahes.com jensenhughes.com
Christensen, Andrew From:
 
Sent:
CONNECT        WITH                    US Receive  the latest company                                                    updates,            industry    news                  and                    free educational                          insights from      our            experts. Siem-up            here
Linthicum, Roy R:(Constellation Nuclear) < roy.linthicum@constellation.com>
 
Saturday, February 24, 2024 11 :40 AM To:
3 Christensen,     Andrew
Christensen, Andrew  
 
From:                                                                                              Linthicum,           Roy                     R:(Constellation Nuclear)             < roy.linthicum@constellation.com>
Sent:                                                                                              Saturday,                         February                                 24,   2024     11 :40 AM To:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Christensen, Andrew


==Subject:==
==Subject:==
Re:       [EXTERNAL]FW: BW-SDP-006                 RO       Signatures
Re: [EXTERNAL]FW: BW-SDP-006 RO Signatures
 
[CAUTION - EXTERNAL SENDER] Warning this email comes from an external source.
[CAUTION             -         EXTERNAL SENDER]                                                                                                                                                                                 Warning                                   this email     comes                               from               an                     external             source.
I, Roy Linthicum, Sr. Manager, Risk Management, approve BW-SDP-006 Rev. 0 Roy Linthicum Sr. Manager, Risk Management Constellation Energy 779-231-6097 630-926-3034 (cell)  
 
~
I,     Roy                     Linthicum,             Sr. Manager,                                       Risk Management,                                               approve                         BW-SDP-006             Rev. 0
Constellation From: Christensen, Andrew <andrew.christensen@jensenhughes.com>
 
Sent: Saturday, February 24, 2024 10:17 AM To: Linthicum, Roy R:(Constellation Nuclear) <roy.linthicum@constellation.com>  
Roy                   Linthicum Sr. Manager,                                     Risk Management Constellation         Energy 779-231-6097 630-926-3034             (cell) _..._,,
    ~                                 Constellation
 
From:                     Christensen, Andrew                 <andrew.christensen@jensenhughes.com>
Sent:         Saturday,                           February                                   24,   2024   10:17   AM To:               Linthicum,               Roy                     R:(Constellation           Nuclear)           <roy.linthicum@constellation.com>


==Subject:==
==Subject:==
[EXTERNAL]FW: BW-SDP-006               RO     Signatures
[EXTERNAL]FW: BW-SDP-006 RO Signatures Andy Christensen (he/him/his)
 
Associate 10 South Wacker Drive, Suite 1300, Chicago, IL 60606 C +1 847-257-5765 andrew.christensen@jensenhuqhes.com jensenhughes.com From: Harden, Adam <AHarden@jensenhughes.com>
Andy                       Christensen         (he/him/his)
Sent: Saturday, February 24, 2024 10:14 AM To: Vanover, Donald <DVanover@jensenhughes.com>; Kolonauski, Lynn <LKolonauski@jensenhughes.com>; Farradj, Usama <UFarradj@jensenhughes.com>; Graven, Ethan <EGraven@jensenhughes.com>; Christensen, Andrew  
Associate
<andrew.christensen@jensenhughes.com>  
 
10 South         Wacker                     Drive, Suite 1300, Chicago,                 IL 60606 C           +1         847-257-5765
 
andrew.christensen@jensenhuqhes.com
 
jensenhughes.com
 
From:                     Harden,                 Adam                     <AHarden@jensenhughes.com>
Sent:         Saturday,                           February                                     24,   2024   10:14   AM To:             Vanover,                                         Donald                     <DVanover@jensenhughes.com>;                                                                                                     Kolonauski,                               Lynn                           <LKolonauski@jensenhughes.com>;                                                                                     Farradj, Usama                                       <UFarradj@jensenhughes.com>;                                                                           Graven,                   Ethan           <EGraven@jensenhughes.com>;                                                                     Christensen, Andrew
<andrew.christensen@jensenhughes.com>


==Subject:==
==Subject:==
RE:       BW-SDP-006                   RO       Signatures
RE: BW-SDP-006 RO Signatures 1}}
 
1}}

Latest revision as of 20:01, 24 November 2024

Attachment 4: BW-SDP-006 Rev. 0 - Braidwood 2B AF Pump Fuel Oil Leak SOP Sensitivities
ML24057A306
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 02/24/2024
From:
Constellation Energy Generation
To:
NRC/RGN-III
Shared Package
ML24057A301 List:
References
BW240007 BW-SDP-006, Rev 0
Download: ML24057A306 (1)


Text

RM DOCUMENTATION NO. BW-SDP-006, Rev. 0 PAGE NO.1 STATION: Braidwood UNIT(S) AFFECTED:

UNIT2 TITLE: Braidwood 28 AF Pump Fuel Oil Leak SDP Sensitivities

SUMMARY

This document describes the FPIE and FPRA modeling, associated results, and sensitivities discussed in reference to the 2B AF pump fuel oil leak at Braidwood.

URE(s) Impacted:

None Number of pages:

32 gages, including this gage.

RM Document Level:

Level 1, ger ER-AA-600-1012 [1].

Internal RM Documentation Electronic Calculation Data Files: BW-SDP-006_R0_Attachment.zip, 83,176 KB, 2/24/2024, 9:45 AM Co-Prepared by: Andrew Christensen

/ Signed Via Email

/2/24/2024 Print Sign Date Co-Prepared by: Ethan Graven

/ Signed Via Email

/2/24/2024 Print Sign Date Co-Prepared by: Usama Farradj

/ Signed Via Email

/2/24/2024 Print Sign Date Co-Prepared by: Lynn Kolonauski

/ Signed Via Email

/2/24/2024 Print Sign Date Reviewed by: Adam Harden

/ Signed Via Email

/2/24/2024 Print Sign Date Reviewed by: Donald Vanover

/ Signed Via Email

/2/24/2024 Print Sign Date Approved by: Roy Linthicum

/ Signed Via Email

/2/24/2024 Print Sign Date Method of Review: [ X] Detailed [] Alternate This RM documentation supersedes:

N/A in its entirety.

External RM Documentation Prepared by: N/A I

I Print Sign Date Approved by: N/A I

I Print Sign Date Do any ASSUMPTIONS I ENGINEER/NG JUDGEMENTS require later verification? [] Yes [ X] No Tracked By: AT#, URE# etc.)

Braidwood Unit 2 2B AF Pump Fuel Oil Leak SDP Sensitivities CONTACTS Braidwood Site Risk Mgmt Engineer Andrew Christensen (773) 718-6601 Fleet. Risk Mgmt Engineer Ethan Graven (224) 422-9458 Internal Events Model Owner Adam Harden Fire PRA Model Owner Usama Farradj 2

Table of Contents 1.0 EVENT OVERVIEW....................................................................................................................................................4 2.0 MAJOR PRA MODEL REFINEMENTS FOR THE SDP.................................................................................................... 4 2.1 FPIE.................................................................................................................................................... 4 2.2 FPRA.................................................................................................................................................. 5 3.0 RESULTS................................................................................................................................................................... 5 4.0 SENSITIVITIES........................................................................................................................................................... 5 4.1 FLEX HEP Sensitivity......................................................................................................................... 5 4.2 28 AF Pump Failure Probability Sensitivity........................................................................................ 9 4.3 Sensitivity Results............................................................................................................................... 9 4.4 Impact from External Events............................................................................................................. 11 4.5 Additional Sensitivity......................................................................................................................... 11 4.6 Key Conservatisms........................................................................................................................... 12

5.0 CONCLUSION

S........................................................................................................................................................ 12

6.0 REFERENCES

........................................................................................................................................................... 13 APPENDIX A FPIE AND FPRA HEP CHANGES................................................................................................................. 14 APPENDIX B ADDITIONAL MODEL CONSERVATISMS.................................................................................................... 26 APPENDIX C SENSITIVITY CALCULATIONS AND EXTERNAL HAZARDS EXTRAPOLATION................................................ 30 3

BW-SDP-006, Rev. 0 1.0 Event Overview Elevated fuel content was identified in the 2B Auxiliary Feedwater (AF) diesel engine lube oil sample during quarterly sampling. A confirmatory sample determined the fuel content was above fault limits and could not be evaluated to be acceptable. An emergent 72-hour LCO entry was made to perform repairs which found fuel leaks at compression fittings on 2 fuel injector return lines and exited on 9/23/2023. The fuel lines and fittings were originally replaced during preventative maintenance during A2R23 (spring 2023). The last previous in-range oil sample was taken on 5/19/2023. Fuel leaks were identified on fuel injectors that had been refurbished at Paragon, Inc. The 16 units were returned to stock at Byron Station on March 27, 2023, PO 1390618 was issued to Paragon March 29, 2023, and repair units were received back onsite at Braidwood Station from Paragon on April 17, 2023. Material condition deficiencies with refurbished fuel injectors, including fuel injector cap sealing surface defects and degraded O-ring, resulted in diesel fuel leaking into the diesel engine oil.

Testing was performed on a Detroit Diesel Series 149 diesel engine to determine if the 2B AF diesel engine could have performed its safety function of driving the 2B AF pump and other connected equipment for a period of at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The engine started with fuel oil diluted lubricating oil representative of the 2B AF engine conditions and operated in this condition for over 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, with additional fuel oil being added to the lube oil during the test to represent the September 2023 as-found condition. Based on the successful performance of the test engine with the fuel oil diluted lube oil and MPR's evaluation determining the test addressed all of the likely engine failure modes, MPR concluded that there is reasonable assurance the Braidwood 2B AF Pump Diesel Drive would have performed its safety function of driving the 2B AF pump and other connected equipment for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> [1]

Based on this testing, the 2B AF pump would have met its PRA success criteria and PRA mission time.

Therefore, the 2B AF pump would be considered available for the duration of the SOP exposure period.

Following IMC 0609 Appendix A Exhibit 2, the 2B AF pump would have maintained its PRA functionality and would screen as Green [2]. The following PRA model refinements, results, and sensitivities are provided under the assumption that the pump would not have met its mission time, in the event the NRC does not agree that PRA success criteria and PRA mission time are met.

2.0 Major PRA Model Refinements for the SDP 2.1 FPIE The major model refinements made to the FPIE model are as follows:

Refined support system initiating event (SSIE) fault trees to improve quantification times Included loss of ESF AC bus initiators as general transients o

Controlled shutdown following loss of ESF AC bus would not need to recognize loss of secondary cooling as FW is available during shutdown.

Incorporated more credit to the DC crosstie to opposite unit DC bus, specifically adding credit for DC crosstie (train A; train B already credited) within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of associated battery charger not being energized.

o Credited the DC bus 111 to 211 DC crosstie (for controlled shutdown following loss of ESF AC bus initiating events only).

Medium Head (MH) FLEX pump credit to supply flow to Steam Generators (SGs) from the RWST, including credit to the N+1 FLEX pump after 4 successful hours of the first FLEX pump.

Updated loss of AC power recovery values for SOP Exposure Period 1 due to credit from ~2 hour 2B AF pump demonstrated run time during Exposure Period 1 Updated various HEPs due to credit for ~2 hour 2B AF pump demonstrated run time during Exposure Period 1. Refer to Appendix A for additional details.

Updated various HEPs due to applying a 10% probability that operators fail to manually trip the unit within 30 seconds of a total loss of Main Feedwater, as opposed to allowing the unit to automatically trip on low SG level.

o Applied to both the base case and Exposure Period 2 4

BW-SDP-006, Rev. 0 o

Refer to Appendix A for additional details 2.2 FPRA The major model refinements made to the FPRA model are as follows:

Scenarios where no reactor trip was anticipated, for U1 (relative to the availability of the U1 cross-tie to support U2) and for U2 received a conservative 0.1 unit trip probability.

11.4C-0 Rad Waste Control Room fire modeling refinements, specifically the size and spread of fires in this zone and how they impact the Unit 1 cables in the zone MH FLEX pump credit to supply flow to SGs from the Refueling Water Storage Tank (RWST),

including credit to the N+1 FLEX pump after 4 successful hours of the first FLEX pump.

Updated various HEPs due to credit from ~2 hour 2B AF pump demonstrated run time during Exposure Period 1. Refer to Appendix A for additional details.

Updated various HEPs due to applying a 10% probability that operators fail to manually trip the unit within 30 seconds of a total loss of Main Feedwater, as opposed to allowing the unit to automatically trip on low SG level.

o Applied to both the base case and Exposure Period 2 o

Refer to Appendix A for additional details.

3.0 Results Table 3.0-1 below shows the results of Braidwood's FPIE and FPRA models following the refinements discussed in Section 2. These models were quantified with average maintenance and with the 2B AF pump Fail to Run event set to TRUE. The exposure period is split up into 2 different periods: Exposure Period 1 is the time before September 1 and Exposure Period 2 is the time after September 1. There are different PRA results before and after September 1 because the 2B AF pump ran for approximately 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> on September 1. Exposure Period 1 credits this proven run time while Exposure Period 2 does not.

Table 3.0-1: SOP Results End FPIE FPRA FPIE FPRA Exposure Total State Delta Delta Time (Days)

Base CDF 7.1 E-06 2.7E-05 N/A N/A N/A N/A Case LERF 1.2E-07 3.3E-06 N/A N/A N/A N/A Exposure CDF 1.6E-05 3.7E-05 8.5E-06 1.0E-05 105 5.4E-06 Period 1 LERF 3.6E-07 4.4E-06 2.5E-07 1.1 E-06 105 3.9E-07 Exposure CDF 1.9E-05 5.6E-05 1.2E-05 2.9E-05 22 2.5E-06 Period 2 LERF 4.6E-07 6.5E-06 3.4E-07 3.2E-06 22 2.1 E-07 Total CDF 127 7.9E-06 Exposure LERF 127 6.0E-07 Period 4.0 Sensitivities 4.1 FLEX HEP Sensitivity After detailed discussions and walkdowns, the NRC has challenged the acceptability of deploying the MH FLEX pump to pull suction from the RWST to supply the SGs. While a detailed human error probability (HEP) calculation for failing to deploy the MH FLEX pump has been completed, the challenge that the NRC has presented is understood. Therefore, the sensitivity increased the execution timing for the HEP calculation. These adjusted HEPs were then used to quantify the FPIE and FPRA models associated with Exposure Period 1. These results are summarized in Section 4.3.

5

BW-SDP-006, Rev. 0 The timing used to calculate the probability that the operators fail to align the MH FLEX pump includes 5 parts:

1.

The length of time for operators to decide to use FLEX per 2BwFR-H.1 - 19 minutes

2.

The time to set up the high head FLEX pump - 132 minutes

3.

The amount of extra time required to establish procedure steps to align the MH FLEX pump. Base case assumes an additional 20 minutes for this part of the action and this is included in the execution time.

4.

The additional time required to set up the MH FLEX pump discharge hoses - 23 minutes

5.

The amount of time required to depressurize the SG that will be fed with the MH FLEX pump - 20 minutes Interval 1 - Before Operations decides to use FLEX, they must rule out the use of the AF crosstie. This, along with making the decision to use FLEX, was simulated by the Operations day shift on 12/10/23 and was determined to be 19 minutes. This time is included in Tcielay depicted in Table 4.1-1 as a 20 minute value.

Intervals 2-4 cover the MH FLEX pump alignment. The reason the high head FLEX pump execution timing is used in Interval 1 is because that action was validated as part of the ELAP FLEX strategy.

OP-BR-102-106 Rev 015 reports this timing under FTSA#8 as 132 minutes. This timing reflects the high head FLEX pump pulling suction from the RWST. Interval 3 reflects the extra time required to establish procedure steps to align the MH FLEX pump to the RWST. Sensitivity to this assumption is explored in Table 4.1-1. Finally, when aligning the MH FLEX pump to pull suction from the RWST, additional discharge hose staging is required for the pump to discharge into the SGs. Therefore, an additional 23 minutes is included as Interval 4. This time was simulated by the day shift on 12/10/23.

Interval 5 - The length of time to depressurize the SGs sufficiently such that the MH FLEX pump can inject flow is accounted for and takes 20 minutes.

Table 4.1-1: Differing Additional Time Applied Due to Procedural Complexity and AF Pump Run Times, with Resulting Action Timing and HEPs In ut Parameters HEP Values Case Available Times Time Required to Establish Procedure Steps to Ali n Medium Head FLEX Pum AFW Tsw Tdelay Tsw-20 Min 30 Min 40 Min 50 Min Pump Run (Min)

(Min)

Tdelay Time Min 1.88 Hours 350 132 218 6.3E-02 2.0 Hours 365 140 225 6.3E-02 3.0 Hours 440 200 240 4.7E-02 4.0 Hours 520 260 260 3.9E-02 4.?E-02

  • Tree= 0; 2.2E-1 is the HEP value with no recovery. Tree= 0 if Tsw is 365 minutes and an additional 50 minutes are used to determine the alignment procedure implementation steps. Note that the MAAP runs quoted in Table 4.1-3 indicate Tsw for 2.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> of AF run time could be as large as 370 minutes and Tsw for 3.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> of AF run time could be as high as 445 minutes. The Tsw values quoted in Table 4. 1-1 are slightly conservative.

The sensitivity in Table 4.1-1 adds additional time for the assumed extra time needed to establish procedure steps to align the MH FLEX pump and shows the change in HEP when the recovery time is reduced. The HEP naturally increases as execution time increases because the recovery time is shorter, which increases the dependency factor. The HEPs based on recovery time available and associated dependency factor are summarized in Table 4.1-2.

6

BW-SDP-006, Rev. 0 Table 4.1-2: HEP Based on Recovery Time Available and Associated Dependency Factor Tree (min)

Dependency Factor FLEX HEP

> 60 Zero Dependence 3.9E-02

> 30 and up to 60 Low Dependence 4.7E-02

> 15 and up to 30 Medium Dependence 6.3E-02

> 0 and up to 15 High Dependence 1.2E-01 0

Complete Dependence 2.2E-01 NeQative N/A 1.0 Table 4.1-1 also varies the amount of time the 28 AF pump ran. By increasing this run time, the core will produce less decay heat when the 28 AF pump fails to run. This lengthens the time to core damage, and thus lengthens the system window time as well as the time available to deploy the MH FLEX pump.

Additional recovery time yields lower dependence and lower HEPs. System window times are determined by the thermal hydraulic analysis in Table 4.1-3, which uses MAAP.

Table 4.1-3: MAAP Quantifications Corresponding to Differing AF Pump Run Time Case BB_506_OSG -

BB_506_OSG -

BB_506_OSG -

BB_506_OSG -

DD188 FLEX1 DD200 FLEX1 DD300 FLEX1 DD400 FLEX1 DDAFW 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br /> 2 hours 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 4 hours operation time SG dryout 241.4 min 250.1 min 321.3 min 390.1 min Core 309.6 min 318.3 min 396.1 min 466.9 min uncovery FLEX start 349.6 min 370 min 445 min 520 min time Peak core 1211 °F 1306 °F 1255 °F 1243 °F temperature The total system window, Tsw, corresponds to the FLEX start time needed to avoid core damage. Delay time, Tdelay, is the 28 AF pump run time plus the time it takes operators to decide to use FLEX. The difference between Tsw and Tdelay is the total amount of time available for operators to complete an action, or Time Required, Tr. The difference between total available time and the time required to execute is Tree, or amount of time available for recovery. Figure 4.1-1 illustrates the timing definitions.

7

BW-SDP-006, Rev. 0 I System Window, T~w

! Time Required, TR L R~o~ry time, ~]I Expected Performance Time, ET I

i I


.....,1.-

.... -.**f----------....... -...

,- time t\\:c O

~\\_[~--------

Qpef.1',l,)!f' is cl.HHJ to perform action

\\ _________,----1 -~

loitiatin~ Event Occurs lrre(:ovenble eod state Figure 4.1-1 Timing Criteria Credit for the ~2 hour 2B AF pump run time provides enough margin to credit the MH FLEX pump deployment. Additionally, earlier in the total exposure period, the 2B AF pump demonstrated at least 3.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> of run time, incrementally decreasing as monthly test runs were completed. Table 4.1-4 shows this demonstrated run time.

Table 4.1-4: 28 AF Pump Demonstrated Runtime Date Run Time (Hours) 6/8/2023 0.61 7/14/2023 0.57 8/10/2023 0.52 9/1/2023 1.88 Total 3.58 Along with the greater than 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> run time from the Detroit Diesel test, the 2B AF pump run times currently credited in the analysis are bounding. Credit for additional run time could substantially influence the assumed boundary conditions in this analysis.

On 12/10/23, the day shift on Braidwood Unit 2 walked through a simulated operator response of what they would do after the 2B AF pump tripped after a unit trip, and the 2A AF pump, FW restoration, and the AF crosstie were all unavailable. They recognized the need to restore SG feed in time to prevent core damage would be the major objective and the MH FLEX pump pulling suction from the RWST would be faster than the using the low head FLEX pump pulling suction from the lake to supply the MH FLEX pump. The crew identified they would use the MH FLEX pump but noted concerns due to supplying the SGs with contaminated RWST water. They recognized the Shift Manager would have implemented 1 O CFR 50.54(x) which allows Operations to make decisions outside of procedures in order to protect the health and safety of the public. One identified strategy was to supply the MH FLEX pump via the fire protection system, if it were available, which would be substantially quicker than connecting the FLEX pump to the RWST and would alleviate contamination concerns. This would also alleviate the need to connect the 3400' of 5" hose required to connect the low head FLEX pump drafting off of the cooling lake to supply the MH FLEX pump, should this suction supply option be selected as described in the 8

BW-SDP-006, Rev. 0 procedure. However, the crew would pursue alternate success paths in parallel provided the operator resources were available.

The operations crews are made up of highly trained individuals dedicated to protecting the health and safety of the public. If the crew lost AF, FW restoration, and the AF crosstie, they would not stop attempting alternative strategies to restore secondary cooling. While these additional operator actions were not quantified in the FPIE and FPRA models, these operator actions should be qualitatively considered in tandem with the modeled operator actions.

The discussion above demonstrates a realistic pathway towards cooling the core in the understood scenario. Operations has stated that by implementing 10 CFR 50.54(x), they would implement non-proceduralized actions to protect the health and safety of the public. This includes different suction sources for the MH FLEX pump, like the Fire Protection header. While the implementation of 10 CFR 50.54(x) does introduce some level of unpredictability in operator response, operators are trained to cool the core in any way possible. While they may not take the exact actions discussed in the HEP development above, they would take action. The purpose of this HEP sensitivity is to bound this uncertainty. The sensitivity results, included in Section 4.3, considers 3 HEPs for the MH FLEX pump HFE: 0.063 (nominal or medium dependence, as shown in Table 4.1-2), 0.3, and 1.0 (no flex credit).

4.2 28 AF Pump Failure Probability Sensitivity The example Detroit Diesel testing report shows that the 2B AF pump would have met its PRA mission time and would have been considered available for the duration of the SOP exposure period. However, an additional sensitivity, modifying the 2B AF pump failure rate, is included to address any proposed uncertainty regarding the Detroit Diesel engine testing. The results of this sensitivity are included in Tables 4.3-1 through 4.3-6.

4.3 Sensitivity Results The tables below contain the results of several sensitivity studies. The FLEX HEP described in Section 4.1 is varied from its nominal value of 0.063 to 0.3 to 1.0 (True). Additionally, the 2B AF pump FTR value is varied from 0.1 to 0.5 to 1.0 (True). Tables 4.3-1 and 4.3-2 show the ~CDF and ~LERF values for the FPIE model sensitivity results, respectively. Similarly, Tables 4.3-3 and 4.3-4 show the ~CDF and ~LERF values for the FPRA model sensitivity results, respectively. Finally, the FPIE and FPRA results are combined in Tables 4.3-5 and 4.3-6 for ~CDF and ~LERF, respectively.

Due to the Detroit Diesel test running for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the pump is assumed to run for at least 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for the duration of the exposure period. Therefore, the values in these tables use the Exposure Period 1 refinements for the entire 127-day duration. This is different from the SOP calculation in Table 3.0-1, which uses the Exposure Period 2 base over the entire exposure period. The base from Exposure Period 1 was used because it credits the MH FLEX pump strategy and the demonstrated 2B AF pump/engine run time. This yields a lower base metric and therefore larger and more conservative difference between the base and sensitivity CDF and LERF.

Appendix C provides additional detail for the sensitivity calculations.

9

BW-SDP-006, Rev. 0 Table 4.3-1 FPIE LiCDF Sensitivities FLEX HEP 0.063 0.3 TRUE 2BAF 0.1 2.?E-07 3.6E-07 4.8E-07 Pump 0.5 1.6E-06 1.8E-06 2.0E-06 Failure TRUE Probability 3.2E-06 3.5E-06 4.0E-06 Table 4.3-2 FPIE LiLERF Sensitivities FLEX HEP 0.063 0.3 TRUE 2BAF 0.1 7.?E-09 9.9E-09 1.3E-08 Pump 0.5 4.6E-08 5.1E-08 5.8E-08 Failure TRUE Probability 9.3E-08 1.0E-07 1.1 E-07 Table 4.3-3 FIRE LiCDF Sensitivities FLEX HEP 0.063 0.3 TRUE 2BAF 0.1 4.2E-07 7.3E-07 1.3E-06 Pump 0.5 2.2E-06 3.3E-06 5.2E-06 Failure TRUE Probability 4.0E-06 6.2E-06 9.6E-06 Table 4.3-4 FIRE b.LERF Sensitivities FLEX HEP 0.063 0.3 TRUE 2BAF 0.1 4.5E-08 7.3E-08 1.3E-07 Pump 0.5 2.3E-07 3.2E-07 5.0E-07 Failure TRUE Probability 4.3E-07 6.3E-07 9.3E-07 10

BW-SDP-006, Rev. 0 Table 4.3-5 TOTAL LiCDF Sensitivities FLEX HEP 0.063 0.3 TRUE 28AF 0.1 6.9E-07 1.1 E-06 1.SE-06 Pump 0.5 3.?E-06 5.0E-06 7.2E-06 Failure TRUE Probability 7.2E-06 9.?E-06 1.4E-05 Table 4.3-6 TOTAL LiLERF Sensitivities FLEX HEP 0.063 0.3 TRUE 28AF 0.1 5.3E-08 8.3E-08 1.5E-07 Pump 0.5 2.?E-07 3.?E-07 5.6E-07 Failure TRUE Probability 5.3E-07 7.3E-07 1.0E-06 4.4 Impact from External Events The NRC provided 3 tiCDF data points for their external, high winds and seismic contributions to the SDP determination: 9.5E-7, 6.5E-7, and 5E-7. These values are highlighted in Table 4.4-1. 9.5E-7 is the base case, and then the NRC provided a sensitivity with the FLEX HEP set to 0.063 and 0.5 for the 2B AF pump FTR value. In lieu of trying to reproduce the modifications that were made to the SPAR model, an extrapolation is performed. The first step was to extrapolate to the top right value first. Then, the other values are derived after assigning their FLEX sensitivity to the bottom left as an anchor point.

T bl 4 4 1 LiCDF d t S.

H. h w* d a e ue o eIsmIc, IQ In s, an dT d

orna oes FLEX HEP 0.063 0.3 TRUE 28 AF Pump 0.1 2.2E-07 2.?E-07 4.1 E-07 Failure Probability 0.5 3.4E-07 4.3E-07 6.5E-07 TRUE 5.0E-07 6.3E-07 9.5E-07 Adding these extrapolated results to Table 4.3-5 leads to the following:

T bl 4 4 2 T t I LiCDF. I d.

S.

a e oa

, inc u InQ

eIsmIc, IQ In s, an H. hW. d dT d

orna oes FLEX HEP 0.063 0.3 TRUE 28 AF Pump Failure 0.1 9.1 E-7 1.4E-6 2.2E-6 Probability 0.5 4.1 E-6 5.5E-6 7.9E-6 TRUE 7.7E-6 1.0E-5 1.5E-5 4.5 Additional Sensitivity An additional sensitivity is included in Table 4.5-1 that shows the LiCDF and LiLERF representing the 2B AF pump FTR probability set to 0.053 (twice the nominal failure probability) and no MH FLEX pump credit. Since there is no MH FLEX pump credit, the Exposure Period 2 base is used in the LiCDF and LiLERF calculations, which is more appropriate for this sensitivity case. Only the case in which FLEX is not credited is performed, because these results bound any case that credits FLEX. The LiCDF for Seismic, High Winds, and Tornadoes uses the same extrapolation methodology described in Section 4.4.

yielding a conservative addition of 3.SE-07 to the total shown in Table 4.5-1.

11

BW-SDP-006, Rev. 0 Appendix C provides additional detail for the sensitivity calculations.

a e 11ona T bl 4 5 1 AddT IS T *t R ens1 IVl[Y It esu s FPIE FIRE Seismic, High Winds, Total and Tornadoes LlCDF 9.0E-08 3.SE-07 3.8E-07 8.2E-07 LlLERF 2.0E-09 3.8E-08 N/A 4.0E-08 4.6 Key Conservatisms There are conservatisms included in this analysis that should be considered for impacts on results. On 2/8/24, an Operations crew was put in a loss of feedwater scenario in the control room simulator to validate the timing used in the FLEX HEP calculation. The scenario consisted of a total loss of feedwater and failure of AF pumps to start. Operations responded to the loss of feedwater by tripping the unit and entering the Loss of Heat Sink procedure after failing to restart the AF pumps. They simulated sending an equipment operator to open the AF crosstie valves, and then attempted to restart Feedwater and Condensate/Condensate Booster pumps. After those strategies failed, the simulated equipment operator reported back that the AF crosstie valves could not be opened. The control room responded by entering FSG-3 and directing equipment operators to begin aligning the MH FLEX pump.

In summary, the operators took 13 minutes from the LOFW to trip the unit, navigate emergency operating procedures, and finally, direct equipment operators to align the MH FLEX pump for SG feed flow. The fully developed HEP assumes the operators take 20 minutes to arrive at this decision, which is conservative.

Additionally, operators in the control room simulator had to execute post-trip actions in parallel with the AF failure and had the added stress of using multiple procedures simultaneously. In the modeled scenario, the 2B AF pump provides SG feed flow for approximately 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after the unit trip. In those 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, operators would have completed the post-trip actions and stabilized the unit. This is an additional conservatism because in the control room simulator, the operators had to respond to the unit trip and the loss of heat sink simultaneously.

Finally, by the time the 2B AF pump is assumed to trip at ~2 hours after the unit trip, additional Operations personnel would have reported to the station per administrative procedures in response to the plant trip.

These personnel, who are not credited in the FLEX HEP calculation, would be available to assist in the decision making or execution tasks for the MH FLEX pump alignment.

5.0 Conclusions The results of this analysis provide an overview of the impact of crediting FLEX and the Detroit Diesel testing for the SOP evaluation.

The sensitivity results show that a FLEX HEP of 0.3 or setting the 2B AF pump fail to run probability to 0.5 would yield no greater than a White finding. Considering the Detroit Diesel test ran for over 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, it is reasonable to conclude that the 2B AF pump would have run for longer than the assumed ~2hours.

Additionally, the operator simulation discussed in Section 4.6 provides high confidence that the FLEX strategy can be implemented.

Additional model conservatisms have also been identified that could lead to additional reductions in the calculated risk for the Detailed Risk Evaluation, which are detailed in Appendix B.

12

BW-SDP-006, Rev. 0 6.0 References

1.

4101-0031-RPT-001 Revision 0, "Test Report and Past Operability Evaluation Braidwood AF Diesel Drive Test with Lube Oil Diluted by Fuel Oil". January 2024

2.

NRC Inspection Manual Chapter 0609 Appendix A, "The Significance Determination Process for Findings At-Power". January 2021.

13

d FPRA HEP Changes

) edits made to the FPIE and FPRA models for SOP quantifications. HFEs ending in "-F" signify FPRA HFEs, which have

p1E version.

HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update HEPs OPERATORS FAIL TO CLOSE 2.8E-02 3.8E-02 OPPOSITE UNIT AF0005 VALVES LOCALLY (LOFW)

OPERATOR FAILS TO XTIE 3.5E-03

  1. N/A TRAIN A or B DC BUS POWER FROM OPPOSITE UNIT (NON-ELAP)

OPERATORS FAIL TO RESTORE 1.3E-03 1.6E-03 LEVEL TO SX TOWER BASIN (BYRON ONLY)

OPS FAILS TO TRIP RCP TO 2.1 E-02 2.9E-021 PROTECT SD SEALS - NO SEAL COOLING OPS FAILS TO TRIP RCP TO 2.1 E-03 2.2E-032 PROTECT NON-SD SEALS - NO SEAL COOLING node! update HEP value was used for the FPIE SOP quantification.

nodel update HEP value was used for the FPIE SOP quantification.

14 Edits The execution time for the AF crosstie (13 minutes) was entered by mistake. The applicable execution time is 6 minutes. This is the time to close the AF005s locally per operator interviews conducted at Byron in May 2009.

This is a new action developed to replace the original action 0DC-12-XTIE-HDCOA, OPERATOR FAILS TO XTIE TRAIN B DC BUS POWER FROM OPPOSITE UNIT, which was developed for ELAP scenarios.

Removed an execution subtask found to be non-critical.

The action originally included BOP SX-12 Step F.1.c to "VERIFY/OPEN 0SX158A/B or 0SX157A/B, Essential Service Water Basin Inlet Valve." This subtask was removed as the SX CT System Notebook (BB-PRA-005.018 R3) states, "The basin makeup valves (0SX157A

& B, 0SX158A & B) are assumed to be normally open, do not need to change position, and therefore are not modeled.

Corrected execution time, Texe, from an overly conservative 5 minutes to 2 minutes based on Operations input collected on 1.2.2024 during the BW2 AF SOP effort.

Corrected execution time, Texe, from an overly conservative 5 minutes to 2 minutes based on Operations input collected on 1.2.2024 during the BW2 AF SOP effort.

HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update Edits HEPs OPERATORS FAIL TO STOP RH 2.3E-03 6.0E-03 Edited CBOTM element Pee, "Skip a Step in Procedure",

PUMPS (TRANSIENT) to endstate "h". The step was originally treated as 2.6E-03 "hidden" (i.e., endstate "i"), which is considered overly conservative.

Current Pee entry:

- The Note located prior to Step 25 in FRH1 specifically states that the RH pumps should not be run longer than 2.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> without CC flow applied to the RH HX. (Not treated as "hidden".)

- The crew is possibly in more than one procedure, depending on the given scenario. ("Multiple" procedures selected.)

- While the direction is located within a Note with a border, it is not considered to be graphically distinct.

-While the BBW operators use the circle/slash method of placekeeping and this method satisfies the requirements of Constellation procedure HU-AA-104-101, because the 2.4-hour direction is located in a Note and in not in a procedure step, no credit is taken for placekeeping aids.

OPERATORS FAIL TO REFILL 1.4E-04 6.9E-04 1 AF01 PB-FO-HXVOA-F is for refilling the OOAF fuel oil OOAFP FUEL OIL DAY TANK supply for the non-SOP unit (Unit 1). While there is FROM STORAGE TANK 5.7E-043 5.7E-03 sufficient time to support the feasibility for TSC activation

("ERF Review" in the HRAC), TSC recovery credit was not applied in the baseline HEP calc as an Alert was not assured for every scenario in which this action is credited. TSC activation is justified and applied in the SOP scenario.

,.5E-04 was used in FPRA quantification.

15

HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update Edits HEPs SOP INTERVAL 1 HEP EDITS p

OPERATORS FAIL TO ALIGN 6.3E-02 N/A This action was developed to reflect use of the MH FLEX FLEX PUMP FOR SG pump taking suction on the RWST for the SDP-1 INVENTORY MAKEUP (GIVEN exposure period. This baseline version adds an 1.88 HR AF SUCCESS, EXEC additional 20 minutes to the execution time for ONLY) communication between the operators executing the alignment and shift Operations management as the execution procedures do not exactly match the non-ELAP scenario and step omissions will be needed.

Given the cue timing, the same HEP applies for FPIE and Fire.

OPERATORS FAIL TO CLOSE 1.4E-03 N/A Tsw: With AF success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />, reestablishing SG OPPOSITE UNIT AF0005 VALVES feed by the 349.6 minute (5.83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br />) point allows LOCALLY (1.88 HR AF 2.2E-03 avoidance of core damage per MAAP run credit)_SDP BB_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

OPERATORS FAIL TO EXECUTE 2.5E-03 N/A Tsw: With AF success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />, reestablishing SG AF CROSSTIE FROM OPPOSITE feed by the 349.6 minute (5.83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br />) point allows UNIT (EXE ONLY; 1.88 HR AF 2.?E-03 avoidance of core damage per MAAP run credit)_SDP BB_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 2BwFR-H.1 Attachment Band supported by multiple operator interviews.

FIRE - OPERATORS FAIL TO 6.?E-03 N/A Tsw: With AF success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />, reestablishing SG OPEN AF005 VALVES (LOCALLY feed by the 349.6 minute (5.83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br />) point allows FAIL AIR; LOFW w 1.88 HR AF avoidance of core damage per MAAP run credit)_SDP BB_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

OPERATOR FAILS TO START 1.8E-03 N/A Tsw: With AF success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />, reestablishing SG MOTOR-DRIVEN AFW PUMP feed by the 349.6 minute (5.83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br />) point allows AFTER FAILURE OF DC (1.88 HR 5.2E-02 avoidance of core damage per MAAP run AF credit)_SDP BB_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

16

HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update Edits HEPs OPERATORS FAIL TO LOCALLY 2.3E-03 N/A Tsw: With AF success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />, reestablishing SG START 8 AUXILIARY feed by the 349.6 minute (5.83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br />) point allows FEEDWATER PUMP (1.88 HR AF avoidance of core damage per MAAP run credit)_SDP 88_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 28wFR-H.1 Attachment 8 and supported by multiple operator interviews.

OPERATORS FAIL TO MANUALLY 5.4E-04 N/A Tsw: With AF success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />, reestablishing SG START AF PUMPS FROM CR feed by the 349.6 minute (5.83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br />) point allows (1.88 HR AF credit)_SDP 1.1 E-03 avoidance of core damage per MAAP run 88_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 28wFR-H.1 Attachment 8 and supported by multiple operator interviews.

OPERATORS FAIL TO 8.1 E-04 N/A Tsw: With AF success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />, reestablishing SG RECOGNIZE THE LOSS OF feed by the 349.6 minute (5.83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br />) point allows SECONDARY COOLING 7.0E-04 avoidance of core damage per MAAP run (COGNITIVE ONLY; 1.88 HR 88_506_OSG_DD188_FLEXh. This is past SG dryout as AF)_SDP allowed by 28wFR-H.1 Attachment 8 and supported by multiple operator interviews.

OPERATORS FAIL TO RESTORE 1.0E-03 N/A Tsw: With AF success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />, reestablishing SG ALTERNATE FEEDWATER (EXE feed by the 349.6 minute (5.83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br />) point allows ONLY; 1.88 HRAF credit)_SDP 1.4E-02 avoidance of core damage per MAAP run 88_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 28wFR-H.1 Attachment 8 and supported by multiple operator interviews.

OPERATORS FAIL TO EXECUTE 2.4E-04 N/A Tsw: For the 8&F action for the SDP-1 interval (AF TO OPEN PZR PORVS FOR 8/F success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />), MAAP run COOLING (EXE ONLY; 1.88 HR 2.8E-02 88506_ 1 PORV _ 1SI_DDAFW188d indicates core AF credit)_SDP damage can be avoided if 8&F is initiated within 204.0 minutes. This is NOT prior to SG dryout.

FIRE - OPS FAILS TO OPEN PZR 2.4E-04 N/A Tsw: For the 8&F action for the SDP-1 interval (AF PORVS FOR 8/F COOLING (EXE success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />), MAAP run ONLY, LOFW w 1.88 HR AF credit, 88506_ 1 PORV _ 1SI_DDAFW188d indicates core Pe Recovery)_SDP damage can be avoided if 8&F is initiated within 204.0 minutes. This is NOT prior to SG dryout.

17

HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update Edits HEPs OPERATORS FAIL TO INITIATE SI 1.5E-04 N/A Tsw: For the B&F action for the SDP-1 interval (AF FOR BLEED AND FEED success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />), MMP run COOLING (EXE ONLY; 1.88 HR 1.0E-02 BB506_ 1 PORV _ 1SI_DDAFW188d indicates core AF credit)_SDP damage can be avoided if B&F is initiated within 204.0 minutes. This is NOT prior to SG dryout.

FIRE - OPERATORS FAIL TO 1.5E-04 N/A Tsw: For the B&F action for the SDP-1 interval (AF INITIATE SI FOR BLEED AND success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />), MMP run FEED COOLING (EXE ONLY, BB506_ 1 PORV _ 1SI_DDAFW188d indicates core LOFW w 1.88 HR AF credit, Pe damage can be avoided if B&F is initiated within 204.0 Recovery) SOP minutes. This is NOT prior to SG dryout.

BASE CASE AND SOP INTERVAL 2 HEP EDITS

cenarios, the original baseline actions for SG feed restoration and Bleed and Feed (B&F) used a system window that reflected N SG level at -45 seconds. Operator interviews and observed simulator scenarios identified that the BBW crews are trained to insert
Jiately upon the recognition of the total loss of feed condition. The SG Feed restoration and B&F actions were revised to reflect a split reactor trip at 30 seconds with a failure rate of 10%. That is, the HEPs for total LOFW initiators and failure of AF were numerically

[0.1 *(HEPsase) + 0.9*(HEPsoP-2)]

1e baseline HEPs associated with the common cognitive action, 1 FW-FRH1-FHSGOA, all used the time to optimized B&F as a zed B&F time is 30 minutes for scenarios that only credit the automatic plant trip on low SG level. This is conservative for SG feed

~un BB_NoBF _Scram_AutoC (LOFW with no AFW and automatic plant trip on low SG level) indicates that the SGs will retain

>red by 39.9 minutes.

OPERATORS FAIL TO CLOSE 1.4E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual OPPOSITE UNIT AF0005 VALVES reactor trip upon recognition of the LOFW. If AFW is LOCALLY (LOFW w 30s trip)_SDP initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

G OPERATORS FAIL TO CLOSE 6.6E-03 3.8E-02 Tsw: MMP Run BB_NoBF _Scram_AutoC (LOFW with OPPOSITE UNIT AF0005 VALVES no AFW and automatic plant trip on low SG level)

LOCALLY (LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point. (Note the 2022 HEP value includes the higher Texe value which was corrected in the SOP effort and in the working copy of the HRAC.)

18

HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update Edits HEPs OPERATORS FAIL TO EXECUTE 2.5E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual AF CROSSTIE FROM OPPOSITE reactor trip upon recognition of the LOFW. If AFW is UNIT (EXE ONLY; LOFWw 30s initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is trip)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

3 OPERATORS FAIL TO EXECUTE 2.1 E-02 7.0E-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFWwith AF CROSSTIE FROM OPPOSITE no AFW and automatic plant trip on low SG level)

UNIT (EXE ONLY; LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.

OPERATORS FAIL TO OPEN 4.0E-02 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual AF005 VALVES (LOCALLY FAIL reactor trip upon recognition of the LOFW. If AFW is AIR; LOFW w 30s trip)_SDP initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

~

OPERATORS FAIL TO OPEN 4.1 E-02 9.7E-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with J

AF005 VALVES (LOCALLY FAIL no AFW and automatic plant trip on low SG level)

AIR; LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.

OPERATOR FAILS TO START 1.SE-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual MOTOR-DRIVEN AFW PUMP reactor trip upon recognition of the LOFW. If AFW is AFTER FAILURE OF DC (LOFW w initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is 30s trip)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

RIG OPERATOR FAILS TO START 7.SE-03 2.SE-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with MOTOR-DRIVEN AFW PUMP no AFW and automatic plant trip on low SG level)

AFTER FAILURE OF DC indicates that the SGs will retain inventory if SG feed is (LOFW) SOP restored by the 39.9 minute point.

19

HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update Edits HEPs OPERATORS FAIL TO LOCALLY 2.3E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual START B AUXILIARY reactor trip upon recognition of the LOFW. If AFW is FEEDWATER PUMP (LOFW w 30s initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is trip)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

~IG OPERATORS FAIL TO LOCALLY 9.6E-03 1.5E-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with START B AUXILIARY no AFW and automatic plant trip on low SG level)

FEEDWATER PUMP (LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.

OPERATORS FAIL TO MANUALLY 5.4E-04 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual START AF PUMPS FROM CR reactor trip upon recognition of the LOFW. If AFW is (LOFWw 30s trip)_SDP initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

RIG OPERATORS FAIL TO MANUALLY 8.7E-04 1.7E-03 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with START AF PUMPS FROM CR no AFW and automatic plant trip on low SG level)

(LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.

OPERATORS FAIL RECOGNIZE 8.1 E-04 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual THE LOSS OF SECONDARY reactor trip upon recognition of the LOFW. If AFW is COOLING (COGNITIVE ONLY; initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is LOFW w 30s trip_no AF)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

IIG OPERATORS FAIL RECOGNIZE 2.2E-03 3.3E-03 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with THE LOSS OF SECONDARY no AFW and automatic plant trip on low SG level)

COOLING (COGNITIVE ONLY; indicates that the SGs will retain inventory if SG feed is LOFW) SOP restored by the 39.9 minute point.

20

HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update Edits HEPs OPERATORS FAIL TO RESTORE 1.0E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual ALTERNATE FEEDWATER (EXE reactor trip upon recognition of the LOFW. If AFW is ONLY; LOFWw 30s trip)_SDP initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

~IG OPERATORS FAIL TO RESTORE 1.0E-02 3.6E-02 Tsw: MMP Run BB_NoBF _Scram_AutoC (LOFW with ALTERNATEFEEDWATER(EXE no AFW and automatic plant trip on low SG level)

ONLY; LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.

OPERATORS FAIL TO EXECUTE 2.4E-04 N/A Tsw: MMP run BB_LatestBF _Scram_30A, indicates that TO OPEN PZR PORVS FOR B/F the latest time for B&F to prevent core damage with a COOLING (EXE ONLY; LOFWw manual plant trip at 30 seconds and without SG feed is 30s trip) SOP 71.4 minutes.

OPERATORS FAIL TO EXECUTE 4.2E-03 4.2E-03 Tsw: In order to avoid core damage, bleed and feed TO OPEN PZR PORVS FOR B/F would have to be initiated by 30 minutes (Tsw) per BBW COOLING (EXE ONLY; MMP run BB0007c (LOFW with no AFW and automatic LOFW) SOP plant trip on low SG level).

OPERATORS FAIL TO INITIATE SI 1.5E-04 NIA Tsw: MMP run BB_LatestBF _Scram_30A, indicates that FOR BLEED AND FEED the latest time for B&F to prevent core damage with a COOLING (EXE ONLY; LOFWw manual plant trip at 30 seconds and without SG feed is 30s trip) SOP 71.4 minutes.

OPERATORS FAIL TO INITIATE SI 1.6E-03 1.6E-03 Tsw: In order to avoid core damage, bleed and feed FOR BLEED AND FEED would have to be initiated by 30 minutes (Tsw) per BBW COOLING (EXE ONLY; MAAP run BB0007c (LOFW with no AFW and automatic LOFW) SOP plant trip on low SG level).

FIRE - OPERATORS FAIL TO 1.7E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual CLOSE OPPOSITE UNIT AF005 reactor trip upon recognition of the LOFW. If AFW is VALVES LOCALLY (LOFWw initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is manual trip at 30s)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

21

HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update Edits HEPs

~IG FIRE - OPERATORS FAIL TO 2.SE-02 1.0 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with CLOSE OPPOSITE UNIT AF005 no AFW and automatic plant trip on low SG level)

VALVES LOCALLY (LOFWTsw indicates that the SGs will retain inventory if SG feed is used for Fire) SOP restored by the 39.9 minute point.

FIRE - OPERATORS FAIL TO 2.SE-034 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual ALIGN AF XTIE FROM OPPOSITE reactor trip upon recognition of the LOFW. If AFW is UNIT (EXE ONLY; LOFWw 30s initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is trip)_SOP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

~IG FIRE - OPERATORS FAIL TO 6.6E-02 7.0E-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFWwith ALIGN AF XTIE FROM OPPOSITE no AFW and automatic plant trip on low SG level)

UNIT (EXE ONLY; LOFWTsw used indicates that the SGs will retain inventory if SG feed is for Fire) SOP restored by the 39.9 minute point.

FIRE - OPERATORS FAIL TO 6.7E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual OPEN AF005 VALVES (LOCALLY reactor trip upon recognition of the LOFW. If AFW is FAIL AIR; LOFWw 30s trip)_SOP initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is I

past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

FIRE - OPERATORS FAIL TO 1.7E-02 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual OPEN AF005 VALVES (LOCALLY reactor trip upon recognition of the LOFW. If AFW is FAIL AIR; LOFWw 30s trip)_SOP initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is 1

past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

'.IG FIRE - OPERATORS FAIL TO 5.2E-02 2.8E-01 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with OPEN AF005 VALVES (LOCALLY no AFW and automatic plant trip on low SG level)

FAIL AIR; LOFWTsw used for indicates that the SGs will retain inventory if SG feed is Fire) SOP restored by the 39.9 minute point.

.7E-03 was used in FPRA quantification.

22

HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update Edits HEPs FIRE - OPS FAILS TO START MD 2.2E-035 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual AFW PUMP AFTER FAILURE OF reactor trip upon recognition of the LOFW. If AFW is DC (LOFW w 30s trip)_SDP initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dry out as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

ORIG FIRE - OPS FAILS TO START MD 1.0E-02 9.5E-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with AFW PUMP AFTER FAILURE OF no AFW and automatic plant trip on low SG level)

DC (LOFW Tsw used in Fire)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.

FIRE - OPERATORS FAIL TO 1.1E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual MANUALLY START AF PUMPS reactor trip upon recognition of the LOFW. If AFW is FROM CR (LOFW w 30s trip)_SDP initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

RIG FIRE - OPERATORS FAIL TO 1.5E-03 4.9E-03 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with MANUALLY START AF PUMPS no AFW and automatic plant trip on low SG level)

FROM CR (LOFW Tsw used in indicates that the SGs will retain inventory if SG feed is Fire) SDP restored by the 39.9 minute point.

FIRE - OPERATORS FAIL 7.0E-04 NIA Tsw: MAAP run BB_LatestBF _Scram_30A, indicates that RECOGNIZE THE CUE TO the latest time for B&F to prevent core damage with a SECONDARY COOLING (LOFW w manual plant trip at 30 seconds and without SG feed is 30s trip)_SDP 71.4 minutes. After this time, RCS injection flow cannot prevent core damage when the bleed path is opened.

RIG FIRE - OPERATORS FAIL 8.5E-03 8.3E-03 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFWwith RECOGNIZE THE CUE TO no AFW and automatic plant trip on low SG level)

SECONDARY COOLING (LOFW indicates that the SGs will retain inventory if SG feed is Tsw used for Fire) SDP restored by the 39.9 minute point.

,.2E-02 was used in FPRA quantification.

23

HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update Edits HEPs FIRE - OPERATORS FAIL TO 6.7E-036 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual RESTORE ALTERNATE reactor trip upon recognition of the LOFW. If AFW is FEEDWATER (EXE ONLY; LOFW initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is w 30s trip)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

HIG FIRE - OPERATORS FAIL TO 3.SE-02 4.5E-02 Tsw: MMP Run BB_NoBF _Scram_AutoC (LOFWwith RESTORE ALTERNATE no AFW and automatic plant trip on low SG level)

FEEDWATER (EXE ONLY; LOFW indicates that the SGs will retain inventory if SG feed is Tsw used in Fire) SOP restored by the 39.9 minute point.

FIRE - OPS FAILS TO OPEN PZR 2.SE-02 N/A Tsw: In order to avoid core damage, feed and bleed PORVS FOR B/F COOLING (EXE would have to be initiated by 71.4 minutes (Tsw) per ONLY; LOFWw 30s trip; NO Pe BBW MMP run BB_LatestBF _Scram_30A.

rec) SOP IG FIRE - OPS FAILS TO OPEN PZR 2.SE-02 2.SE-02 Tsw: In order to avoid core damage, bleed and feed PORVS FOR B/F COOLING (EXE would have to be initiated by 30 minutes (Tsw) per BBW ONLY; LOFWTsw; NO Pe MAAP run BB0007c (LOFW with no AFW and automatic recovery) SOP plant trip on low SG level).

FIRE - OPS FAILS TO OPEN PZR 2.4E-04 N/A Tsw: In order to avoid core damage, feed and bleed PORVS FOR B/F COOLING (EXE would have to be initiated by 71.4 minutes (Tsw) per ONLY, LOFWw 30s trip, Pe BBW MMP run BB_LatestBF _Scram_30A.

Recovery) SOP

IG FIRE - OPS FAILS TO OPEN PZR 4.2E-03 4.2E-03 Tsw: In order to avoid core damage, bleed and feed PORVS FOR B/F COOLING (EXE would have to be initiated by 30 minutes (Tsw) per BBW ONLY, LOFW Tsw, Pe MMP run BB0007c (LOFW with no AFW and automatic Recovery) SOP plant trip on low SG level).

FIRE - OPERATORS FAIL TO 1.0E-02 NIA Tsw: In order to avoid core damage, feed and bleed INITIATE SI FOR BLEED AND would have to be initiated by 71.4 minutes (Tsw) per FEED COOLING (EXE ONLY:

BBW MMP run BB_LatestBF _Scram_30A.

LOFW w 30s trip, NO Pe rec) SOP

.4E-02 was used in FPRA quantification.

24

HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE 1.30.2024 2022 HFE Description HEPs Update Edits HEPs FIRE - OPERATORS FAIL TO 1.0E-02 1.0E-02 Tsw: In order to avoid core damage, bleed and feed INITIATE SI FOR BLEED AND would have to be initiated by 30 minutes (Tsw) per BBW FEED COOLING (EXE ONLY:

MAAP run BB000?c (LOFW with no AFW and automatic LOFW Tsw used in Fire, NO Pe plant trip on low SG level).

rec) SOP FIRE - OPERATORS FAIL TO 1.5E-04 N/A Tsw: In order to avoid core damage, feed and bleed INITIATE SI FOR BLEED AND would have to be initiated by 71.4 minutes (Tsw) per FEED COOLING (EXE ONLY, BBW MAAP run BB_LatestBF _Scram_30A.

LOFW w 30s trip, Pe RECV) SOP

~

FIRE - OPERATORS FAIL TO 1.6E-03 1.6E-03 Tsw: In order to avoid core damage, bleed and feed INITIATE SI FOR BLEED AND would have to be initiated by 30 minutes (Tsw) per BBW FEED COOLING (EXE ONLY, MAAP run BB0007c (LOFW with no AFW and automatic LOFW Tsw, Pe RECV) SOP plant trip on low SG level).

25

,al Model Conservatisms nements have been identified but were not pursued in the model used to generate SOP results. These refinements are md Table 4.2-2, with the Fussel Vesely metrics associated with the refinement to show relative importance and potential

~d risk.

Table 4.2-1: FPIE Additional Model Conservatisms with Estimated Delta Risk Reductions

)nservatisms Exposure Period 1 Risk Reduction Exposure Period 2 Risk Reduction

) AF pump on U1 not available due 0.15%

1%

ance, can be removed since there luring exposure period.

onservative value of 0.1 for pre-1%

N/A system, lower value applicable for 1/o, assume a reduction of a factor of

ts a bounding value applicable to all
equipment, not the specific s SOP (MH pump to S/G, not Jattery chargers and HH pump for k reduction 1%

1%

fable 4.2-2: FPRA Additional Model Conservatisms with Estimated Delta Risk Reductions

)nservatisms Exposure Period 1 Risk Reduction Exposure Period 2 Risk Reduction for Exposure Period 2, although it is N/A 10%

np could have run for some length and JHEPs for AF related actions.

26

fable 4.2-2: FPRA Additional Model Conservatisms with Estimated Delta Risk Reductions

)nservatisms Exposure Period 1 Risk Reduction Exposure Period 2 Risk Reduction

  • pump could have operated for 10%

NIA J 1.88 hour0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br /> demonstrated run time

~ Period 1. Improved HEPs and tions.

s of MFW and reactor trip for all fire 10%

10%

Jtion of those to which a reactor trip

'or a U1 or U2 trip - a risk reduction the ASM-BW-009, Rev. 2, rhe reduction of risk due to Jment with unknown location, no

~ss specific basis for credit is ler of a 10% risk reduction from the duction due to incorporation of cable xder of half this value. However, the P configuration which is driven by

~moval would be expected to be d and Feed requires 1 SI pump and NIA 3%

lpport a change in success criteria V. Quantification is based on the Ji res 1 SI pump and 2 PO RVs for tivity indicated that the reduction in was small, ~1 % for Exposure are expected for Exposure Period 2.

27

fable 4.2-2: FPRA Additional Model Conservatisms with Estimated Delta Risk Reductions

>nservatisms Exposure Period 1 Risk Reduction Exposure Period 2 Risk Reduction failure data.

10%

N/A

.EX system, currently 0.1 value with 4%

N/A i Period 1.

) AF pump on U1 not available due 10%

17%

ance, can be removed since there luring exposure period.

onservative value of 0.1 for pre-9%

N/A system, lower value applicable for o, assume a reduction of a factor of

ts a bounding value applicable to all
equipment, not the specific s SOP (MH pump to S/G, not Jattery chargers and HH pump for

,corporate EPRI realism NUREGs, 10%

10%

G-2233 ites use of the AF crosstie after a potentially not trivial, not yet quantified potentially not trivial, not yet quantified llow credit for an emergency diesel

> pump to be donated to Unit 2 via imps supply the Unit 1 AF needs, ind their support systems are not probability for non-severe panel 5%

6%

rol room fires 28

fable 4.2-2: FPRA Additional Model Conservatisms with Estimated Delta Risk Reductions Jnservatisms Exposure Period 1 Risk Reduction Exposure Period 2 Risk Reduction non-severe panel scenarios,

-2.5%

-2.5%

f spurious operations. Max increase 29

1ity Calculations and External Hazards Extrapolation 30

3.64E*07 4.SSE-07 1.17E-07 1.03E-07

'i244E-07 1407E-07 2620E-07 H46E-07

)987E-07 l410E-07 t940E-07 l587E-07

'i408E-07 7170E-07 SDPcase ExptIme Fire Delta FPIE Delta Total CDF over Total LERF over CDF LERF CDF LERF Delta CDF exp Delta LERF exp SOP-1 105 1.0lE-05 1.llE-06 8.54E-06 2 47E-07 1.87E-05 5.39E-06 1.36E-06 3.90E-07 5DP-2 22 2.94E-05 3.16E-06 1.18E-05 3.38E-07 4.12E-05 2.49E-06 3.SOE-06 2.llE-07 Total risk over exposure period 7.BBE-06 6.0lE-07 SDP-2tor total exp time 127 2.94E-05 3.16E-06 l.18E-05 3.39E-07 4.12E-05 1.43E-05 3.50E-06 1.22E-06 AFPmp TOTAL TOTAL Failure DELTA DELTA DELTA DELTA DELTA DELTA H1ghW1nds, Tornado, Over NewCDF FlexHEP Prob Exp Time FCDF FLERF CDF LERF CDF

  • 127/365 and SeIsmIc delta CDF exposure Total 6.30E-02 0.1 127 l.20E-06 l.30E-07 7.85E-07 2.21E-08 1.98E-06 6.91E-07 1.52E-07 5.29E-08 2.20E-07 2.20E-07 9.llE-07 6.30E-02 0.5 127 6.20E-06 6.50E*07 4.56E-06 1.31E-07 1.0BE-05 3.74E-06 7.BlE-07 2.72E-07 3.40E-07 3.40E-07 4.08E-06 6.30E-02 TRUE 127 1.16E-05 1.25E-06 9.20E-06 2.66E-07 2.08E-05 7.24E-06 1.52E-06 5.27E-07 5.00E-07 5.00E-07 7.74E-06 0.3 0.1 127 2.lOE-06 2.lOE-07 l.02E-06 2.84E-08 3.12E-06 1.09E-06 2.38E-07 8.29E-08 2.70E-07 2.70E-07 1.36E-06 0.3 0.5 127 9.40E-06 9.30E-07 5.09E-06 1.45E-07 1.45E-05 5.04E-06 1.0BE-06 3.74E-07 4.30E-07 4.30E-07 5.47E-06 03 TRUE 127 l.78E-05 l.BlE-06 l.OlE-05 2.90E-07 2.79E-05 9.70E-06 2.lOE-06 7.31E-07 6.30E-07 6.30E-07 l.03E-05 TRUE 0.1 127 3.BOE-06 3.BOE-07 1.39E-06 3.79E-08 5.19E-06 1.BOE-06 4.lBE-07 1.45E-07 4.lOE-07 4.lOE-07 2.21E-06 TRUE 0.5 127 1.49E-05 1.43E-06 5.89E-06 1.67E-07 2.0BE-05 7.23E-06 1.60E-06 5.56E-07 6.SOE-07 6.50E-07 7.BBE-06 TRUE TRUE 127 2.77E*05 2.67E*06 1.14E-05 3.25E-07 3.91E-05 1.36E-05 2.99E-06 1.04E-06 9.SOE-07 9.SOE-07 l.46E-05 TRUE 0.0534 127 l.OOE-06 l.lOE-07 2.59E-07 5.87E-09 1.26E-06 4.38E-07 1.16E-07 4.03E-08 3.BOE-07 3.BOE-07 8.lBE-07 FPIE LERF FIRECDF FIRELERF 0.063 0.3 TRUE 0.063 0.3 TRUE 0.063 0.3 TRUE 0.0534,:t)i,1,t:tY f°}'l,-*c,.\\.

2.0E*09 0.0534 J.~'1;:,r:;,i;{:-

'.'.:~..,:J'w,**

3.SE-07 0.0534}

3.BE-08 0.1 7.7E-09 9.9E-09 1.3E-08 0.1 4.2E-07 7.3E-07 13E-06 0.1 4.SE-08 7 3E-08 1.3E-07 0.5 4.6E-08 5.lE-08 5.BE-08 0.5 2.2E-06 3.3E-06 5.2E-06 0.5 2.3E-07 3.2E-07 5.0E-07 TRUE 9.3E-08 1.0E-07 1.lE-07 TRUE 4.0E-06 6.2E-06 9.6E-06 TRUE 4.3E-07 6.3E-07 9.3E-07 TOT AL LERF over exp Total CDFoverexplncludlngexternal 0.063 0.3 TRUE 0.063 0.3 TRUE 0.0534 4.0E-08 0.0534 ::::h'/.:'

8.2E*07 0.1 5.3E*08 8.3E-08 1.SE-07 0.1 9.lE-07 1.4E-06 2.2E-06 0.5 2.7E-07 3.7E-07 5.6E-07 0.5 4.lE-06 5.5E-06 7.9E-06 TRUE 5.3E-07 7.3E-07 1.0E*06 TRUE 7.7E-06 1.0E-05 1.SE-05

AF FTR External Events Extrapolation HEP TRUE 3.8E-07 0.1 2.2E-07 2.7E-07 4.lE-07 0.5 3.4E-07 4.3E-07 6.SE-07 TRUE 5.0E-07 6.3E-07 9.SE-07 The highlighted cells indicate values provided by the NRC in the initial choice letter. The values on the bottom right were used to extrapolate the values in the rest of the right column. Then, the value in the lower left was used as an anchor point, and the bottom middle value was calculated using linear interpolation. After the bottom row and right column were calculated, the extrapolation was then applied to the other values in the table.

Christensen, Andrew From:

Harden, Adam Sent:

Saturday, February 24, 2024 10:14 AM To:

Subject:

Vanover, Donald; Kolonauski, Lynn; Farradj, Usama; Graven, Ethan; Christensen, Andrew RE: BW-SDP-006 RO Signatures I, Adam Harden, sign BW-SDP-006 Rev. 0 as a qualified reviewer.

ADAM J. HARDEN Staff Engineer II i F: +'i a i1 c,,,dt~:... 1 C:.i) !G n s~ r: ! : uq tv~s. cc1n jensenhughes.com From: Vanover, Donald <DVanover@jensenhughes.com>

Sent: Saturday, February 24, 2024 10:08 AM To: Kolonauski, Lynn <LKolonauski@jensenhughes.com>; Farradj, Usama <UFarradj@jensenhughes.com>; Graven, Ethan

<EGraven@jensenhughes.com>; Christensen, Andrew <andrew.christensen@jensenhughes.com>; Harden, Adam

<AHarden@jensenhughes.com>

Subject:

RE: BW-SDP-006 RO Signatures I, Donald Vanover, sign BW-SDP-006 Rev. 0 as a qualified reviewer.

DONALD VANOVER Global Service Line Leader, Energy + Utilities 153 VVesl C,ay Street, Suite 400, West Chester, PA 19380 0: +1 42-4*-250-6852 i

+1 4.34-4~~7-4372 dvanover@iensenhughes.com jensenhughes.com From: Kolonauski, Lynn <LKolonauski@iensenhughes.com>

Sent: Saturday, February 24, 2024 11:05 AM To: Farradj, Usama <UFarradi@iensenhughes.com>; Graven, Ethan <EGraven@iensenhughes.com>; Christensen, Andrew <andrew.christensen@iensenhughes.com>; Harden, Adam <AHarden@jensenhughes.com>; Vanover, Donald

<DVanover@jensenhughes.com>

Subject:

RE: BW-SDP-006 RO Signatures I, Lynn Kolonauski, sign BW-SDP-006 Rev. 0 as a qualified co-preparer.

LYNN KOLONAUSKI Senior Engineer Risk-Informed Engineering 158 West Gay Street, Suite 400 West Chesler, PA 19380 0 (484) 260-4737 1

lkolonauski@iensenhughes.com jensenhughes.com From: Farradj, Usama <UFarradi@iensenhughes.com>

Sent: Saturday, February 24, 2024 11:04 AM To: Graven, Ethan <EGraven@iensenhughes.com>; Christensen, Andrew <andrew.christensen@iensenhughes.com>;

Kolonauski, Lynn <LKolonauski@iensenhughes.com>; Harden, Adam <AHarden@iensenhughes.com>; Vanover, Donald

<DVanover@jensenhughes.com>

Subject:

RE: BW-SDP-006 RO Signatures I, Usama Farradj, sign BW-SDP-006 Rev. 0 as a qualified co-preparer.

USAMA FARRADJ Manager

'.31 ufarradj@jensenhughes.com From: Graven, Ethan <EGraven@jensenhughes.com>

Sent: Saturday, February 24, 2024 8:03 AM To: Christensen, Andrew <andrew.christensen@jensenhughes.com>; Farradj, Usama <UFarradi@jensenhughes.com>;

Kolonauski, Lynn <LKolonauski@lensenhughes.com>; Harden, Adam <AHarden@iensenhughes.com>; Vanover, Donald

<DVanover@jensenhughes.com>

Subject:

RE: BW-SDP-006 RO Signatures I, Ethan Graven, sign BW-SDP-006 Rev Oas a qualified co-preparer.

Thanks, ETHAN GRAVEN Manager, Midwest jensenhughes.com cmmECT WITH us Receive the latest company updates, industry news and free educational insights from our experts. Siqn-uo here From: Christensen, Andrew <andrew.christensen@jensenhughes.com>

Sent: Saturday, February 24, 2024 10:00 AM To: Graven, Ethan <EGraven@iensenhughes.com>; Farradj, Usama <UFarradi@ljensenhughes.com>; Kolonauski, Lynn

<LKolonauski@iensenhughes.com>; Harden, Adam <AHarden@jensenhughes.com>; Vanover, Donald 2

<DVanover@jensenhughes.com>

Subject:

BW-SDP-OO6 RO Signatures I, Andrew Christensen, sign BW-SDP-OO6 RO as a qualified co-preparer Andy Christensen (he/him/his)

Associate 1 0 South Wacker Drive, Suite 1300, Chicago, IL 60606 C: +1 847-257-5765 andrew.christensen(Q)iensenhuahes.com jensenhughes.com CONNECT WITH US Receive the latest company updates, industry news and free educational insights from our experts. Siem-up here 3

Christensen, Andrew From:

Sent:

Linthicum, Roy R:(Constellation Nuclear) < roy.linthicum@constellation.com>

Saturday, February 24, 2024 11 :40 AM To:

Christensen, Andrew

Subject:

Re: [EXTERNAL]FW: BW-SDP-006 RO Signatures

[CAUTION - EXTERNAL SENDER] Warning this email comes from an external source.

I, Roy Linthicum, Sr. Manager, Risk Management, approve BW-SDP-006 Rev. 0 Roy Linthicum Sr. Manager, Risk Management Constellation Energy 779-231-6097 630-926-3034 (cell)

~

Constellation From: Christensen, Andrew <andrew.christensen@jensenhughes.com>

Sent: Saturday, February 24, 2024 10:17 AM To: Linthicum, Roy R:(Constellation Nuclear) <roy.linthicum@constellation.com>

Subject:

[EXTERNAL]FW: BW-SDP-006 RO Signatures Andy Christensen (he/him/his)

Associate 10 South Wacker Drive, Suite 1300, Chicago, IL 60606 C +1 847-257-5765 andrew.christensen@jensenhuqhes.com jensenhughes.com From: Harden, Adam <AHarden@jensenhughes.com>

Sent: Saturday, February 24, 2024 10:14 AM To: Vanover, Donald <DVanover@jensenhughes.com>; Kolonauski, Lynn <LKolonauski@jensenhughes.com>; Farradj, Usama <UFarradj@jensenhughes.com>; Graven, Ethan <EGraven@jensenhughes.com>; Christensen, Andrew

<andrew.christensen@jensenhughes.com>

Subject:

RE: BW-SDP-006 RO Signatures 1