ML21174A131: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:TN-68 GENERIC TECHNICAL SPECIFICATIONS AMENDMENT NO. 1 Renewed Amendment No. 1
{{#Wiki_filter:TN-68 GENERIC TECHNICAL SPECIFICATIONS AMENDMENT NO. 1 Renewed Amendment No. 1  


TABLE OF CONTENTS 1.0   USE AND APPLICATION ........................................................................................1.1-1 1.1           Definitions ....................................................................................................1.1-1 1.2           Logical Connectors .......................................................................................1.2-1 1.3           Completion Times ........................................................................................1.3-1 1.4           Frequency ....................................................................................................1.4-1 2.0   FUNCTIONAL AND OPERATING LIMITS ...............................................................2.0-1 2.1           Functional and Operating Limits ...................................................................2.0-1 2.1.1         Fuel to be Stored in the TN-68 Cask ............................................................2.0-1 2.2           Functional and Operating Limits Violations ...................................................2.0-2 3.0   LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY .........................3.0-1 3.0   SURVEILLANCE REQUIREMENT (SR) APPLICABILITY ........................................3.0-2 3.1   CASK INTEGRITY ................................................................................................ 3.1.1-1 3.1.1         Cask Cavity Vacuum Drying ...................................................................... 3.1.1-1 3.1.2         Cask Helium Backfill Pressure ................................................................... 3.1.2-1 3.1.3         Cask Helium Leak Rate ............................................................................. 3.1.3-1 3.1.4         Combined Helium Leak Rate ..................................................................... 3.1.4-1 3.1.5         Cask Interseal Pressure ............................................................................ 3.1.5-1 3.1.6         Cask Minimum Lifting Temperature ........................................................... 3.1.6-1 3.2   CASK RADIATION PROTECTION........................................................................ 3.2.1-1 3.2.1         Cask Surface Contamination ..................................................................... 3.2.1-1 4.0   DESIGN FEATURES ...............................................................................................4.0-1 4.1   STORAGE CASK.....................................................................................................4.0-1 4.1.1         Criticality.......................................................................................................4.0-1 4.1.2         Neutron Absorber Tests ...............................................................................4.0-1 4.1.3         Structural Performance .................................................................................4.0-1 4.1.4         Codes and Standards ...................................................................................4.0-1 4.1.5         Helium Purity ................................................................................................4.0-2 4.2   STORAGE PAD .......................................................................................................4.0-2 4.2.1         Storage Locations for Casks.........................................................................4.0-2 4.3   ISFSI SPECIFIC PARAMETERS AND ANALYSES .................................................4.0-3 5.0   ADMINISTRATIVE CONTROLS ..............................................................................5.0-1 5.1   TRAINING MODULE................................................................................................5.0-1 5.2   PROGRAMS ............................................................................................................5.0-2 5.2.1         Cask Sliding Evaluation ................................................................................5.0-2 5.2.2         Cask Transport Evaluation Program .............................................................5.0-2 5.2.3         Cask Surface Dose Rate Evaluation Program ..............................................5.0-3 5.2.4         Aging Management Program ......................................................................5.0-4a Renewed TN-68 Technical Specifications                                    i                                        Amendment No. 1
Renewed TN-68 Technical Specifications i
Amendment No. 1 TABLE OF CONTENTS 1.0 USE AND APPLICATION........................................................................................ 1.1-1 1.1 Definitions.................................................................................................... 1.1-1 1.2 Logical Connectors....................................................................................... 1.2-1 1.3 Completion Times........................................................................................ 1.3-1 1.4 Frequency.................................................................................................... 1.4-1 2.0 FUNCTIONAL AND OPERATING LIMITS............................................................... 2.0-1 2.1 Functional and Operating Limits................................................................... 2.0-1 2.1.1 Fuel to be Stored in the TN-68 Cask............................................................ 2.0-1 2.2 Functional and Operating Limits Violations................................................... 2.0-2 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY......................... 3.0-1 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY........................................ 3.0-2 3.1 CASK INTEGRITY................................................................................................ 3.1.1-1 3.1.1 Cask Cavity Vacuum Drying...................................................................... 3.1.1-1 3.1.2 Cask Helium Backfill Pressure................................................................... 3.1.2-1 3.1.3 Cask Helium Leak Rate............................................................................. 3.1.3-1 3.1.4 Combined Helium Leak Rate..................................................................... 3.1.4-1 3.1.5 Cask Interseal Pressure............................................................................ 3.1.5-1 3.1.6 Cask Minimum Lifting Temperature........................................................... 3.1.6-1 3.2 CASK RADIATION PROTECTION........................................................................ 3.2.1-1 3.2.1 Cask Surface Contamination..................................................................... 3.2.1-1 4.0 DESIGN FEATURES............................................................................................... 4.0-1 4.1 STORAGE CASK..................................................................................................... 4.0-1 4.1.1 Criticality....................................................................................................... 4.0-1 4.1.2 Neutron Absorber Tests............................................................................... 4.0-1 4.1.3 Structural Performance................................................................................. 4.0-1 4.1.4 Codes and Standards................................................................................... 4.0-1 4.1.5 Helium Purity................................................................................................ 4.0-2 4.2 STORAGE PAD....................................................................................................... 4.0-2 4.2.1 Storage Locations for Casks......................................................................... 4.0-2 4.3 ISFSI SPECIFIC PARAMETERS AND ANALYSES................................................. 4.0-3 5.0 ADMINISTRATIVE CONTROLS.............................................................................. 5.0-1 5.1 TRAINING MODULE................................................................................................ 5.0-1 5.2 PROGRAMS............................................................................................................ 5.0-2 5.2.1 Cask Sliding Evaluation................................................................................ 5.0-2 5.2.2 Cask Transport Evaluation Program............................................................. 5.0-2 5.2.3 Cask Surface Dose Rate Evaluation Program.............................................. 5.0-3 5.2.4 Aging Management Program...................................................................... 5.0-4a  


Definitions 1.1 1.0       USE AND APPLICATION 1.1       Definitions
Definitions 1.1 TN-68 Technical Specifications Amendment No. 1 1.1-1 1.0 USE AND APPLICATION 1.1 Definitions
---------------------------------------------------NOTE-----------------------------------------------------------------
---------------------------------------------------NOTE-----------------------------------------------------------------
The defined terms of this section appear in capitalized type and are applicable throughout these Technical Specifications and Bases.
The defined terms of this section appear in capitalized type and are applicable throughout these Technical Specifications and Bases.
Term                                           Definition ACTIONS                                         ACTIONS shall be that part of a Specification that prescribes Required Actions to be taken under designated Conditions within specified Completion Times.
Term Definition ACTIONS ACTIONS shall be that part of a Specification that prescribes Required Actions to be taken under designated Conditions within specified Completion Times.
CHANNEL OPERATIONAL                             A CHANNEL OPERATIONAL TEST (COT) shall be TEST (COT)                                     the injection of a simulated or actual signal into the channel as close to the sensor as practicable to verify the operability of required alarm functions. The COT shall include adjustments, as necessary, of the alarm setpoint so that the setpoint is within the required range and accuracy.
CHANNEL OPERATIONAL A CHANNEL OPERATIONAL TEST (COT) shall be TEST (COT) the injection of a simulated or actual signal into the channel as close to the sensor as practicable to verify the operability of required alarm functions. The COT shall include adjustments, as necessary, of the alarm setpoint so that the setpoint is within the required range and accuracy.
HANDLED BY NORMAL MEANS                         HANDLED BY NORMAL MEANS refers to fuel assemblies/bundles that can be transferred within the spent fuel pool, cask pit and cask by the use of the normal station fuel handling equipment and procedures.
HANDLED BY NORMAL MEANS HANDLED BY NORMAL MEANS refers to fuel assemblies/bundles that can be transferred within the spent fuel pool, cask pit and cask by the use of the normal station fuel handling equipment and procedures.
INTACT FUEL ASSEMBLY                           An INTACT FUEL ASSEMBLY is a spent nuclear fuel assembly without known or suspected cladding defects greater than pinhole leaks or hairline cracks and which can be HANDLED BY NORMAL MEANS. Partial fuel assemblies, that is spent fuel assemblies from which fuel rods are missing, shall not be classified as INTACT FUEL ASSEMBLIES unless dummy fuel rods are used to displace an amount of water equal to or greater than that displaced by the original fuel rod(s). Fuel with damage to spacer grids that renders the fuel outside its design and licensing basis for use in the reactor shall not be classified as an INTACT FUEL ASSEMBLY.
INTACT FUEL ASSEMBLY An INTACT FUEL ASSEMBLY is a spent nuclear fuel assembly without known or suspected cladding defects greater than pinhole leaks or hairline cracks and which can be HANDLED BY NORMAL MEANS. Partial fuel assemblies, that is spent fuel assemblies from which fuel rods are missing, shall not be classified as INTACT FUEL ASSEMBLIES unless dummy fuel rods are used to displace an amount of water equal to or greater than that displaced by the original fuel rod(s). Fuel with damage to spacer grids that renders the fuel outside its design and licensing basis for use in the reactor shall not be classified as an INTACT FUEL ASSEMBLY.
LOADING OPERATIONS                             LOADING OPERATIONS include all licensed activities on a cask while it is being loaded with fuel assemblies.
LOADING OPERATIONS LOADING OPERATIONS include all licensed activities on a cask while it is being loaded with fuel assemblies.
LOADING OPERATIONS begin when the first fuel assembly is placed in the cask and end when the cask is supported from the transporter.
LOADING OPERATIONS begin when the first fuel assembly is placed in the cask and end when the cask is supported from the transporter.
STORAGE OPERATIONS                             STORAGE OPERATIONS include all licensed activities that are performed at the Independent Spent Fuel Storage Installation (ISFSI) while a cask containing spent fuel is sitting on a storage pad within the ISFSI.
STORAGE OPERATIONS STORAGE OPERATIONS include all licensed activities that are performed at the Independent Spent Fuel Storage Installation (ISFSI) while a cask containing spent fuel is sitting on a storage pad within the ISFSI.
(continued)
(continued)
Renewed TN-68 Technical Specifications                              1.1-1                                    Amendment No. 1
Renewed  


Definitions 1.1 1.1   Definitions (continued)
Definitions 1.1 TN-68 Technical Specifications Amendment No. 1 1.1-2 1.1 Definitions (continued)
TRANSPORT OPERATIONS           TRANSPORT OPERATIONS include all licensed activities performed on a cask loaded with one or more fuel assemblies when it is being moved to and from the ISFSI.
TRANSPORT OPERATIONS TRANSPORT OPERATIONS include all licensed activities performed on a cask loaded with one or more fuel assemblies when it is being moved to and from the ISFSI.
TRANSPORT OPERATIONS begin when the cask is first suspended from the transporter and end when the cask is at its destination and no longer supported from the transporter.
TRANSPORT OPERATIONS begin when the cask is first suspended from the transporter and end when the cask is at its destination and no longer supported from the transporter.
UNLOADING OPERATIONS           UNLOADING OPERATIONS include al licensed activities on a cask while fuel assemblies are being unloaded.
UNLOADING OPERATIONS UNLOADING OPERATIONS include al licensed activities on a cask while fuel assemblies are being unloaded.
UNLOADING OPERATIONS begin when the cask is no longer supported by the transporter and end when the last fuel assembly is removed from the cask.
UNLOADING OPERATIONS begin when the cask is no longer supported by the transporter and end when the last fuel assembly is removed from the cask.
Renewed TN-68 Technical Specifications          1.1-2                          Amendment No. 1
Renewed  


Logical Connectors 1.2 1.0   USE AND APPLICATION 1.2   Logical Connectors PURPOSE             The purpose of this section is to explain the meaning of logical connectors.
Logical Connectors 1.2 TN-68 Technical Specifications Amendment No. 1 1.2-1 1.0 USE AND APPLICATION 1.2 Logical Connectors PURPOSE The purpose of this section is to explain the meaning of logical connectors.
Logical connectors are used in Technical Specifications (TS) to discriminate between, and yet connect, discrete Conditions, Required Actions, Completion Times, Surveillances, and Frequencies. The only logical connectors that appear in TS are AND and OR. The physical arrangement of these connectors constitutes logical conventions with specific meanings.
Logical connectors are used in Technical Specifications (TS) to discriminate between, and yet connect, discrete Conditions, Required Actions, Completion Times, Surveillances, and Frequencies. The only logical connectors that appear in TS are AND and OR. The physical arrangement of these connectors constitutes logical conventions with specific meanings.
BACKGROUND         Several levels of logic may be used to state Required Actions. These levels are identified by the placement (or nesting) of the logical connectors and by the number assigned to each Required Action. The first level of logic is identified by the first digit of the number assigned to a Required Action and the placement of the logical connector in the first level of nesting (i.e., left justified with the number of the Required Action).
BACKGROUND Several levels of logic may be used to state Required Actions. These levels are identified by the placement (or nesting) of the logical connectors and by the number assigned to each Required Action. The first level of logic is identified by the first digit of the number assigned to a Required Action and the placement of the logical connector in the first level of nesting (i.e., left justified with the number of the Required Action).
The successive levels of logic are identified by additional digits of the Required Action number and by successive indentions of the logical connectors.
The successive levels of logic are identified by additional digits of the Required Action number and by successive indentions of the logical connectors.
When logical connectors are used to state a Condition, Completion Time, Surveillance, or Frequency, only the first level of logic is used, and the logical connector is left justified with the statement of the Condition, Completion Time, Surveillance, or Frequency.
When logical connectors are used to state a Condition, Completion Time, Surveillance, or Frequency, only the first level of logic is used, and the logical connector is left justified with the statement of the Condition, Completion Time, Surveillance, or Frequency.
EXAMPLES           The following examples illustrate the use of logical connectors.
EXAMPLES The following examples illustrate the use of logical connectors.
(continued)
(continued)
Renewed TN-68 Technical Specifications                1.2-1                                Amendment No. 1
Renewed  


Logical Connectors 1.2 1.2   Logical Connectors EXAMPLES               EXAMPLE 1.2-1 (continued)
Logical Connectors 1.2 TN-68 Technical Specifications Amendment No. 1 1.2-2 1.2 Logical Connectors EXAMPLES EXAMPLE 1.2-1 (continued)
ACTIONS CONDITION             REQUIRED ACTION             COMPLETION TIME A. LCO not met.           A.1 Verify...
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. LCO not met.
A.1 Verify...
AND A.2 Restore...
AND A.2 Restore...
In this example the logical connector AND is used to indicate that when in Condition A, both Required Actions A.1 and A.2 must be completed.
In this example the logical connector AND is used to indicate that when in Condition A, both Required Actions A.1 and A.2 must be completed.
(continued)
(continued)
Renewed TN-68 Technical Specifications              1.2-2                            Amendment No. 1
Renewed  


Logical Connectors 1.2 1.2   Logical Connectors EXAMPLES               EXAMPLE 1.2-2 (continued)
Logical Connectors 1.2 TN-68 Technical Specifications Amendment No. 1 1.2-3 1.2 Logical Connectors EXAMPLES EXAMPLE 1.2-2 (continued)
ACTIONS CONDITION             REQUIRED ACTION           COMPLETION TIME A. LCO not met.           A.1   Stop...
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. LCO not met.
A.1 Stop...
OR A.2.1 Verify...
OR A.2.1 Verify...
AND A.2.2.1 Reduce...
AND A.2.2.1 Reduce...
OR A.2.2.2 Perform...
OR A.2.2.2 Perform...
OR A.3       Remove...
OR A.3 Remove...
This example represents a more complicated use of logical connectors.
This example represents a more complicated use of logical connectors.
Required Actions A.1, A.2, and A.3 are alternative choices, only one of which must be performed as indicated by the use of the logical connector OR and left justified placement. Any one of these three Actions may be chosen. If A.2 is chosen, then both A.2.1 and A.2.2 must be performed as indicated by the logical connector AND. Required Action A.2.2 is met by performing A.2.2.1 or A.2.2.2.
Required Actions A.1, A.2, and A.3 are alternative choices, only one of which must be performed as indicated by the use of the logical connector OR and left justified placement. Any one of these three Actions may be chosen. If A.2 is chosen, then both A.2.1 and A.2.2 must be performed as indicated by the logical connector AND. Required Action A.2.2 is met by performing A.2.2.1 or A.2.2.2.
The indented position of the logical connector OR indicates that A.2.2.1 and A.2.2.2 are alternative choices, only one of which must be performed.
The indented position of the logical connector OR indicates that A.2.2.1 and A.2.2.2 are alternative choices, only one of which must be performed.
Renewed TN-68 Technical Specifications                1.2-3                          Amendment No. 1
Renewed  


Completion Times 1.3 1.0   USE AND APPLICATION 1.3   Completion Times PURPOSE             The purpose of this section is to establish the Completion Time convention and to provide guidance for its use.
Completion Times 1.3 TN-68 Technical Specifications Amendment No. 1 1.3-1 1.0 USE AND APPLICATION 1.3 Completion Times PURPOSE The purpose of this section is to establish the Completion Time convention and to provide guidance for its use.
BACKGROUND         Limiting Conditions for Operation (LCOs) specify minimum requirements for ensuring safe operation of the cask. The ACTIONS associated with an LCO state Conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated Condition are Required Action(s) and Completion Times(s).
BACKGROUND Limiting Conditions for Operation (LCOs) specify minimum requirements for ensuring safe operation of the cask. The ACTIONS associated with an LCO state Conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated Condition are Required Action(s) and Completion Times(s).
DESCRIPTION         The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the time of discovery of a situation (e.g., equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the cask is in a specified condition stated in the Applicability of the LCO. Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and the Required Actions apply until the Condition no longer exists or the cask is not within the LCO Applicability.
DESCRIPTION The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the time of discovery of a situation (e.g., equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the cask is in a specified condition stated in the Applicability of the LCO. Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and the Required Actions apply until the Condition no longer exists or the cask is not within the LCO Applicability.
Once a Condition has been entered, subsequent subsystems, components, or variables expressed in the Condition, discovered to be not within limits, will not result in separate entry into the Condition unless specifically stated. The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition.
Once a Condition has been entered, subsequent subsystems, components, or variables expressed in the Condition, discovered to be not within limits, will not result in separate entry into the Condition unless specifically stated. The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition.
(continued)
(continued)
Renewed TN-68 Technical Specifications                1.3-1                              Amendment No. 1
Renewed  


Completion Times 1.3 1.3   Completion Times (continued)
Completion Times 1.3 TN-68 Technical Specifications Amendment No. 1 1.3-2 1.3 Completion Times (continued)
EXAMPLES           The following examples illustrate the use of Completion Times with different types of Conditions and changing Conditions.
EXAMPLES The following examples illustrate the use of Completion Times with different types of Conditions and changing Conditions.
EXAMPLE 1.3-1 ACTIONS CONDITION               REQUIRED ACTION               COMPLETION TIME B. Required Action     B.1           Perform Action     12 hours and associated                    B.1.
EXAMPLE 1.3-1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. Required Action and associated Completion Time not met.
Completion Time not met.      AND B.2           Perform Action     36 hours B.2.
B.1 Perform Action B.1.
Condition B has two Required Actions. Each Required Action has its own separate Completion Time. Each Completion Time is referenced to the time that Condition B is entered.
AND B.2 Perform Action B.2.
12 hours 36 hours Condition B has two Required Actions. Each Required Action has its own separate Completion Time. Each Completion Time is referenced to the time that Condition B is entered.
The Required Actions of Condition B are to complete action B.1 within 12 hours AND to complete action B.2 within 36 hours. A total of 12 hours is allowed for completing action B.1 and a total of 36 hours (not 48 hours) is allowed for completing action B.2 from the time that Condition B was entered. If action B.1 is completed within 6 hours, the time allowed for completing action B.2 is the next 30 hours because the total time allowed for completing action B.2 is 36 hours.
The Required Actions of Condition B are to complete action B.1 within 12 hours AND to complete action B.2 within 36 hours. A total of 12 hours is allowed for completing action B.1 and a total of 36 hours (not 48 hours) is allowed for completing action B.2 from the time that Condition B was entered. If action B.1 is completed within 6 hours, the time allowed for completing action B.2 is the next 30 hours because the total time allowed for completing action B.2 is 36 hours.
(continued)
(continued)
Renewed TN-68 Technical Specifications              1.3-2                            Amendment No. 1
Renewed  


Completion Times 1.3 1.3 Completion Times EXAMPLES             EXAMPLE 1.3-2 (continued)
Completion Times 1.3 TN-68 Technical Specifications Amendment No. 1 1.3-3 1.3 Completion Times EXAMPLES EXAMPLE 1.3-2 (continued)
ACTIONS CONDITION                 REQUIRED ACTION               COMPLETION TIME A. One system not       A.1           Restore system     7 days within limit.                      to within limit.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One system not within limit.
B. Required Action       B.1           Perform Action     12 hours and associated                      B.1.
A.1 Restore system to within limit.
Completion Time not met.        AND B.2           Perform Action     36 hours B.2.
7 days B. Required Action and associated Completion Time not met.
When a system is determined to not meet the LCO, Condition A is entered. If the system is not restored within 7 days, Condition B is also entered and the Completion Time clocks for Required Actions B.1 and B.2 start. If the system is restored after Condition B is entered, Condition A and B are exited, and therefore, the Required Actions of Condition B may be terminated.
B.1 Perform Action B.1.
AND B.2 Perform Action B.2.
12 hours 36 hours When a system is determined to not meet the LCO, Condition A is entered. If the system is not restored within 7 days, Condition B is also entered and the Completion Time clocks for Required Actions B.1 and B.2 start. If the system is restored after Condition B is entered, Condition A and B are exited, and therefore, the Required Actions of Condition B may be terminated.
(continued)
(continued)
Renewed TN-68 Technical Specifications              1.3-3                              Amendment No. 1
Renewed  


Completion Times 1.3 1.3 Completion Times EXAMPLES           EXAMPLE 1.3-3 (continued)
Completion Times 1.3 TN-68 Technical Specifications Amendment No. 1 1.3-4 1.3 Completion Times EXAMPLES EXAMPLE 1.3-3 (continued)
ACTIONS
ACTIONS
                    -------------------------NOTE--------------------------------------------------------
-------------------------NOTE--------------------------------------------------------
Separate Condition entry is allowed for each component.
Separate Condition entry is allowed for each component.
CONDITION                     REQUIRED ACTION                       COMPLETION TIME A. LCO not met.           A.1               Restore                   4 hours compliance with LCO.
CONDITION REQUIRED ACTION COMPLETION TIME A. LCO not met.
B. Required Action         B.1               Perform Action           12 hours and associated                            B.1.
A.1 Restore compliance with LCO.
Completion Time not met.          AND B.2               Perform Action           36 hours B.2.
4 hours B. Required Action and associated Completion Time not met.
The Note above the ACTIONS Table is a method of modifying how the Completion Time is tracked. If this method of modifying how the Completion Time is tracked was applicable only to a specific Condition, the Note would appear in that Condition rather than at the top of the ACTIONS Table.
B.1 Perform Action B.1.
AND B.2 Perform Action B.2.
12 hours 36 hours The Note above the ACTIONS Table is a method of modifying how the Completion Time is tracked. If this method of modifying how the Completion Time is tracked was applicable only to a specific Condition, the Note would appear in that Condition rather than at the top of the ACTIONS Table.
The Note allows Condition A to be entered separately for each component, and Completion Times tracked on a per component basis.
The Note allows Condition A to be entered separately for each component, and Completion Times tracked on a per component basis.
When a component is determined to not meet the LCO, Condition A is entered and its Completion Time starts. If subsequent components are determined to not meet the LCO, Condition A is entered for each component and separate Completion Times start and are tracked for each component.
When a component is determined to not meet the LCO, Condition A is entered and its Completion Time starts. If subsequent components are determined to not meet the LCO, Condition A is entered for each component and separate Completion Times start and are tracked for each component.
(continued)
(continued)
Renewed TN-68 Technical Specifications                    1.3-4                                      Amendment No. 1
Renewed  


Completion Times 1.3 1.3 Completion Times (continued)
Completion Times 1.3 TN-68 Technical Specifications Amendment No. 1 1.3-5 1.3 Completion Times (continued)
IMMEDIATE           When "Immediately" is used as a Completion Time, the Required Action COMPLETION         should be pursued without delay and in a controlled manner.
IMMEDIATE When "Immediately" is used as a Completion Time, the Required Action COMPLETION should be pursued without delay and in a controlled manner.
TIME Renewed TN-68 Technical Specifications            1.3-5                          Amendment No. 1
TIME Renewed  


Frequency 1.4 1.0 USE AND APPLICATION 1.4 Frequency PURPOSE             The purpose of this section is to define the proper use and application of Frequency requirements.
Frequency 1.4 TN-68 Technical Specifications Amendment No. 1 1.4-1 1.0 USE AND APPLICATION 1.4 Frequency PURPOSE The purpose of this section is to define the proper use and application of Frequency requirements.
DESCRIPTION         Each Surveillance Requirement (SR) has a specified Frequency in which the Surveillance must be met in order to meet the associated Limiting Condition for Operation (LCO). An understanding of the correct application of the specified Frequency is necessary for compliance with the SR.
DESCRIPTION Each Surveillance Requirement (SR) has a specified Frequency in which the Surveillance must be met in order to meet the associated Limiting Condition for Operation (LCO). An understanding of the correct application of the specified Frequency is necessary for compliance with the SR.
The "specified Frequency" is referred to throughout this section and each of the Specifications of Section 3.0, Surveillance Requirement (SR)
The "specified Frequency" is referred to throughout this section and each of the Specifications of Section 3.0, Surveillance Requirement (SR)
Applicability. The "specified Frequency" consists of the requirements of the Frequency column of each SR, as well as certain Notes in the Surveillance column that modify performance requirements.
Applicability. The "specified Frequency" consists of the requirements of the Frequency column of each SR, as well as certain Notes in the Surveillance column that modify performance requirements.
Situations where a Surveillance could be required (i.e., its Frequency could expire), but where it is not possible or not desired that it be performed until sometime after the associated LCO is within its Applicability, represent potential SR 3.0.4 conflicts. To avoid these conflicts, the SR (i.e., the Surveillance or the Frequency) is stated such that it is only "required" when it can be and should be performed. With an SR satisfied, SR 3.0.4 imposes no restriction.
Situations where a Surveillance could be required (i.e., its Frequency could expire), but where it is not possible or not desired that it be performed until sometime after the associated LCO is within its Applicability, represent potential SR 3.0.4 conflicts. To avoid these conflicts, the SR (i.e., the Surveillance or the Frequency) is stated such that it is only "required" when it can be and should be performed. With an SR satisfied, SR 3.0.4 imposes no restriction.
The use of "met" or "performed" in these instances conveys specific meanings. A Surveillance is "met" only when the acceptance criteria are satisfied. Known failure of the requirements of a Surveillance, even without a Surveillance specifically being "performed", constitutes a Surveillance not "met." "Performance" refers only to the requirement to specifically determine the ability to meet the acceptance criteria. SR 3.0.4 restrictions would not apply if both the following conditions are satisfied:
The use of "met" or "performed" in these instances conveys specific meanings. A Surveillance is "met" only when the acceptance criteria are satisfied. Known failure of the requirements of a Surveillance, even without a Surveillance specifically being "performed", constitutes a Surveillance not "met." "Performance" refers only to the requirement to specifically determine the ability to meet the acceptance criteria. SR 3.0.4 restrictions would not apply if both the following conditions are satisfied:
: a.       The Surveillance is not required to be performed; and
a.
: b.       The Surveillance is not required to be met or, even if required to be met, is not known to be failed.
The Surveillance is not required to be performed; and b.
The Surveillance is not required to be met or, even if required to be met, is not known to be failed.
(continued)
(continued)
Renewed TN-68 Technical Specifications                1.4-1                            Amendment No. 1
Renewed  


Frequency 1.4 1.4 Frequency (continued)
Frequency 1.4 TN-68 Technical Specifications Amendment No. 1 1.4-2 1.4 Frequency (continued)
EXAMPLES             The following examples illustrate the various ways that Frequencies are specified.
EXAMPLES The following examples illustrate the various ways that Frequencies are specified.
EXAMPLE 1.4-1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                 FREQUENCY Verify pressure within limit.                                 12 hours Example 1.4-1 contains the type of SR most often encountered in the Technical Specifications(TS). The Frequency specifies an interval (12 hours) during which the associated Surveillance must be performed at least one time. Performance of the Surveillance initiates the subsequent interval. Although the Frequency is stated as 12 hours, an extension of the time interval to 1.25 times the interval specified in the Frequency is allowed by SR 3.0.2 for operational flexibility. The measurement of this interval continues at all times, even when the SR is not required to be met per SR 3.0.1 (such as when the equipment is inoperable, a variable is outside specified limits, or the cask is outside the Applicability of the LCO). If the interval specified by SR 3.0.2 is exceeded while the cask is in a condition specified in the Applicability of the LCO, the LCO is not met in accordance with SR 3.0.1.
EXAMPLE 1.4-1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY Verify pressure within limit.
12 hours Example 1.4-1 contains the type of SR most often encountered in the Technical Specifications(TS). The Frequency specifies an interval (12 hours) during which the associated Surveillance must be performed at least one time. Performance of the Surveillance initiates the subsequent interval. Although the Frequency is stated as 12 hours, an extension of the time interval to 1.25 times the interval specified in the Frequency is allowed by SR 3.0.2 for operational flexibility. The measurement of this interval continues at all times, even when the SR is not required to be met per SR 3.0.1 (such as when the equipment is inoperable, a variable is outside specified limits, or the cask is outside the Applicability of the LCO). If the interval specified by SR 3.0.2 is exceeded while the cask is in a condition specified in the Applicability of the LCO, the LCO is not met in accordance with SR 3.0.1.
If the interval as specified by SR 3.0.2 is exceeded while the cask is not in a condition specified in the Applicability of the LCO for which performance of the SR is required, the Surveillance must be performed within the Frequency requirements of SR 3.0.2 prior to entry into the specified condition. Failure to do so would result in a violation of SR 3.0.4.
If the interval as specified by SR 3.0.2 is exceeded while the cask is not in a condition specified in the Applicability of the LCO for which performance of the SR is required, the Surveillance must be performed within the Frequency requirements of SR 3.0.2 prior to entry into the specified condition. Failure to do so would result in a violation of SR 3.0.4.
(continued)
(continued)
Renewed TN-68 Technical Specifications                1.4-2                            Amendment No. 1
Renewed  


Frequency 1.4 1.4 Frequency EXAMPLES             EXAMPLE 1.4-2 (continued)
Frequency 1.4 TN-68 Technical Specifications Amendment No. 1 1.4-3 1.4 Frequency EXAMPLES EXAMPLE 1.4-2 (continued)
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                   FREQUENCY Verify flow is within limits.                                 Once within 12 hours prior to starting activity AND 24 hours thereafter Example 1.4-2 has two Frequencies. The first is a one time performance Frequency, and the second is of the type shown in Example 1.4-1. The logical connector "AND" indicates that both Frequency requirements must be met. Each time the example activity is to be performed, the Surveillance must be performed within 12 hours prior to starting the activity.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY Verify flow is within limits.
Once within 12 hours prior to starting activity AND 24 hours thereafter Example 1.4-2 has two Frequencies. The first is a one time performance Frequency, and the second is of the type shown in Example 1.4-1. The logical connector "AND" indicates that both Frequency requirements must be met. Each time the example activity is to be performed, the Surveillance must be performed within 12 hours prior to starting the activity.
The use of "once" indicates a single performance will satisfy the specified Frequency (assuming no other Frequencies are connected by "AND").
The use of "once" indicates a single performance will satisfy the specified Frequency (assuming no other Frequencies are connected by "AND").
This type of Frequency does not qualify for the extension allowed by SR 3.0.2.
This type of Frequency does not qualify for the extension allowed by SR 3.0.2.
                      "Thereafter" indicates future performances must be established per SR 3.0.2, but only after a specified condition is first met (i.e., the "once" performance in this example). If the specified activity is canceled or not performed, the measurement of both intervals stops. New intervals start upon preparing to restart the specified activity.
"Thereafter" indicates future performances must be established per SR 3.0.2, but only after a specified condition is first met (i.e., the "once" performance in this example). If the specified activity is canceled or not performed, the measurement of both intervals stops. New intervals start upon preparing to restart the specified activity.
Renewed TN-68 Technical Specifications                1.4-3                                Amendment No. 1
Renewed  


Functional and Operational Limits 2.0 2.0 FUNCTIONAL AND OPERATIONAL LIMITS 2.1 Functional and Operational Limits 2.1.1     Fuel to be Stored in the TN-68 Cask The spent nuclear fuel to be stored in the TN-68 cask shall meet the following requirements:
Functional and Operational Limits 2.0 TN-68 Technical Specifications Amendment No. 1 TN-68 Technical Specifications 2.0-1 2.0 FUNCTIONAL AND OPERATIONAL LIMITS 2.1 Functional and Operational Limits 2.1.1 Fuel to be Stored in the TN-68 Cask The spent nuclear fuel to be stored in the TN-68 cask shall meet the following requirements:
A.     Fuel shall be unconsolidated INTACT FUEL ASSEMBLIES except that up to 8 fuel assemblies with damage consisting of known or suspected cladding defects greater than pinholes or hairline cracks may be stored subject to the following limitations:
A.
: i.     they must be HANDLED BY NORMAL MEANS ii. they must be stored in a basket configured for damaged fuel, in the designated compartments shown in Figure 2.1.1-1, with end caps installed top and bottom, iii. there must be no missing fuel pins or fuel pin segments, unless dummy rods are used to displace an amount of water equal to or greater than that displaced by the original fuel rod(s), and iv. assembly average burnup is limited to #45 GWd/MTU.
Fuel shall be unconsolidated INTACT FUEL ASSEMBLIES except that up to 8 fuel assemblies with damage consisting of known or suspected cladding defects greater than pinholes or hairline cracks may be stored subject to the following limitations:
B.     Fuel shall be limited to fuel with Zircaloy cladding. Fuel having stainless steel replacement rods may be stored provided that a shielding analysis demonstrates that the dose rate contribution from such rods is bounded by the design basis fuel rods.
i.
C.     Fuel shall be limited to the following fuel types or equivalents by other manufacturers with the following unirradiated specifications:
they must be HANDLED BY NORMAL MEANS ii.
                                                        #of       Max         Min     Max Fuel       Rod         Rod     Uranium Assembly Type       Designation         Rods       Pitch       OD     Content (MTU/assy)
they must be stored in a basket configured for damaged fuel, in the designated compartments shown in Figure 2.1.1-1, with end caps installed top and bottom, iii.
GE     7x7         2,2A,2B             49         0.738       0.563   0.1977 GE     7x7         3,3A,3B             49         0.738       0.563   0.1923 GE     8x8         4,4A,4B             63         0.640       0.493   0.1880 GE     8x8         5,6,6B,7,7B         62         0.640       0.483   0.1876 GE     8x8         8,8B               62         0.640       0.483   0.1885 GE     8x8         8,8B,9,9B,10       60         0.640       0.463   0.1824 GE     9x9         11,13               74         0.566       0.440   0.1757 GE     10x10       12                 92         0.510       0.404   0.1857 Fuel designs 6, 6B, 7 and 7B may also be designated as P, B or BP.
there must be no missing fuel pins or fuel pin segments, unless dummy rods are used to displace an amount of water equal to or greater than that displaced by the original fuel rod(s), and iv.
assembly average burnup is limited to #45 GWd/MTU.
B.
Fuel shall be limited to fuel with Zircaloy cladding. Fuel having stainless steel replacement rods may be stored provided that a shielding analysis demonstrates that the dose rate contribution from such rods is bounded by the design basis fuel rods.
C.
Fuel shall be limited to the following fuel types or equivalents by other manufacturers with the following unirradiated specifications:
#of Max Min Max Fuel Rod Rod Uranium Assembly Type Designation Rods Pitch OD Content (MTU/assy)
GE 7x7 2,2A,2B 49 0.738 0.563 0.1977 GE 7x7 3,3A,3B 49 0.738 0.563 0.1923 GE 8x8 4,4A,4B 63 0.640 0.493 0.1880 GE 8x8 5,6,6B,7,7B 62 0.640 0.483 0.1876 GE 8x8 8,8B 62 0.640 0.483 0.1885 GE 8x8 8,8B,9,9B,10 60 0.640 0.463 0.1824 GE 9x9 11,13 74 0.566 0.440 0.1757 GE 10x10 12 92 0.510 0.404 0.1857 Fuel designs 6, 6B, 7 and 7B may also be designated as P, B or BP.
Fuel designs may be C, D or S lattice only.
Fuel designs may be C, D or S lattice only.
D.     Fuel assemblies may be channeled or unchanneled. Channel thickness up to 0.120 inches thick are acceptable.
D.
Fuel assemblies may be channeled or unchanneled. Channel thickness up to 0.120 inches thick are acceptable.
(continued)
(continued)
Renewed TN-68 Technical Specifications                    2.0-1                            Amendment No. 1
Renewed  


Functional and Operational Limits 2.0 2.1   Functional and Operational Limits (continued)
Functional and Operational Limits 2.0 TN-68 Technical Specifications 2.0-2 Amendment No. 1 2.1 Functional and Operational Limits (continued)
E.       7x7 fuel assemblies shall have the bounding characteristics specified in Table 2.1.1-1.
E.
F.       8x8, 9x9, and 10x10 fuel assemblies shall be selected using the flow chart in Figure 2.1.1-2.
7x7 fuel assemblies shall have the bounding characteristics specified in Table 2.1.1-1.
G.       All fuel assemblies shall have the following bounding characteristics:
F.
: i. maximum initial enrichment per Table 2.1.1-2 ii. The maximum weight per individual assembly shall be 705 pounds.
8x8, 9x9, and 10x10 fuel assemblies shall be selected using the flow chart in Figure 2.1.1-2.
2.2   Functional and Operational Limits Violations If any Functional and Operational Limit of 2.1.1 is violated, the following actions shall be completed:
G.
2.2.1   The affected fuel assemblies shall be removed from the cask and placed in a safe condition.
All fuel assemblies shall have the following bounding characteristics:
2.2.2   Within 24 hours, notify the NRC Operations Center.
i.
2.2.3   Within 30 days, a special report shall be submitted to the NRC which describes the cause of the violation and the actions taken to restore compliance and prevent recurrence.
maximum initial enrichment per Table 2.1.1-2 ii.
Renewed TN-68 Technical Specifications                2.0-2                            Amendment No. 1
The maximum weight per individual assembly shall be 705 pounds.
2.2 Functional and Operational Limits Violations If any Functional and Operational Limit of 2.1.1 is violated, the following actions shall be completed:
2.2.1 The affected fuel assemblies shall be removed from the cask and placed in a safe condition.
2.2.2 Within 24 hours, notify the NRC Operations Center.
2.2.3 Within 30 days, a special report shall be submitted to the NRC which describes the cause of the violation and the actions taken to restore compliance and prevent recurrence.
Renewed  


Functional and Operational Limits 2.0 Table 2.1.1-1 Minimum Acceptable Cooling Time as a Function of Max. Burnup and Min. Initial Enrichment for 7x7 Fuel REQUIRED BWR COOLING TIMES (YEARS)
Functional and Operational Limits 2.0 TN-68 Technical Specifications 2.0-3 Amendment No. 1 Table 2.1.1-1 Minimum Acceptable Cooling Time as a Function of Max. Burnup and Min. Initial Enrichment for 7x7 Fuel 15 20 30 32 33 34 35 36 37 38 39 40 10 10 10 10 10 10 10 10 10 10 10 10 10 10 11 11 11 10 10 10 10 10 11 11 11 10 10 10 10 10 11 11 11 12 10 10 10 10 10 11 11 11 11 12 10 10 10 10 10 11 11 11 11 12 10 10 10 10 10 10 11 11 11 12 12 10 10 10 10 10 10 11 11 11 12 12 12 10 10 10 10 10 10 11 11 11 12 12 12 10 10 10 10 10 10 11 11 11 11 12 12 10 10 10 10 10 10 10 11 11 11 12 12 10 10 10 10 10 10 10 11 11 11 12 12 10 10 10 10 10 10 10 11 11 11 12 12 10 10 10 10 10 10 10 10 11 11 11 12 10 10 10 10 10 10 10 10 10 11 11 12 10 10 10 10 10 10 10 10 10 11 11 12 10 10 10 10 10 10 10 10 10 10 11 12 10 10 10 10 10 10 10 10 10 10 11 12 10 10 10 10 10 10 10 10 10 10 10 11 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
Min.Init. Enrich. (1)    Maximum Burnup (GWd/MTU) (2)
- not evaluated Min.Init. Enrich. (1)
(bundle ave %w)(3)    15 20 30 32 33 34 35 36 37 38 39 40 1.0          10 10 1.1          10 10 1.2          10 10 1.3          10 10 1.4          10 10 1.5          10 10 10 10 11 11 11 1.6          10 10 10 10 10 11 11 11 1.7          10 10 10 10 10 11 11 11 12 1.8          10 10 10 10 10 11 11 11 11 12 1.9          10 10 10 10 10 11 11 11 11 12 2.0          10 10 10 10 10 10 11 11 11 12 12 2.1          10 10 10 10 10 10 11 11 11 12 12 12 2.2          10 10 10 10 10 10 11 11 11 12 12 12 2.3          10 10 10 10 10 10 11 11 11 11 12 12 2.4          10 10 10 10 10 10 10 11 11 11 12 12 2.5          10 10 10 10 10 10 10 11 11 11 12 12 2.6          10 10 10 10 10 10 10 11 11 11 12 12 2.7          10 10 10 10 10 10 10 10 11 11 11 12 2.8          10 10 10 10 10 10 10 10 10 11 11 12 2.9          10 10 10 10 10 10 10 10 10 11 11 12 3.0          10 10 10 10 10 10 10 10 10 10 11 12 3.1          10 10 10 10 10 10 10 10 10 10 11 12 3.2          10 10 10 10 10 10 10 10 10 10 10 11 3.3          10 10 10 10 10 10 10 10 10 10 10 10 3.4          10 10 10 10 10 10 10 10 10 10 10 10 3.5          10 10 10 10 10 10 10 10 10 10 10 10 3.6          10 10 10 10 10 10 10 10 10 10 10 10 3.7          10 10 10 10 10 10 10 10 10 10 10 10
Maximum Burnup (GWd/MTU) (2)
                                        - not evaluated
(bundle ave %w)(3) 1.0 1.1 1.8 1.9 2.0 1.7 1.3 1.4 1.5 1.6 2.9 3.0 2.5 2.6 2.4 2.7 2.8 2.1 2.2 2.3 3.7 REQUIRED BWR COOLING TIMES (YEARS) 3.3 3.4 3.5 3.6 3.1 3.2 1.2
: 1. Round actual value down to next lower tenth.
: 1. Round actual value down to next lower tenth.
: 2. Round actual value up to next higher GWd/MTU.
: 2. Round actual value up to next higher GWd/MTU.
: 3. Average over entire bundle including uranium blankets.
: 3. Average over entire bundle including uranium blankets.
: 4. A decay heat limit of 312 W/assembly is included in the table basis.
: 4. A decay heat limit of 312 W/assembly is included in the table basis.
Renewed TN-68 Technical Specifications                  2.0-3                        Amendment No. 1
Renewed  


Functional and Operational Limits 2.0 Table 2.1.1-2 Enrichment Limit as a Function of Basket Type Specified Minimum B10 Areal Density       Intact Fuel        Damaged (mg B10/cm2) in Basket             Maximum             Fuel Lattice        Maximum       Basket Borated Aluminum          Average            Pellet    Designator Boral 75%     and Metal Matrix       Enrichment        Enrichment B10 credit      Composites 90%         (wt % U235)      (wt % U235)
Functional and Operational Limits 2.0 TN-68 Technical Specifications 2.0-4 Amendment No. 1 Table 2.1.1-2 Enrichment Limit as a Function of Basket Type Specified Minimum B10 Areal Density (mg B10/cm2) in Basket Intact Fuel Maximum Lattice Average Enrichment (wt % U235)
B10 credit 36                   30                 3.7             3.7       (none) 42                   35                 3.95             3.95           A 48                   40                 4.05             4.05           B 54                   45                 4.15             4.15           C 60                   50                 4.3               4.3           D 66                   55                 4.4               4.4           E 72                   60                 4.5               4.5           F 84                   70                 4.7               4.7           G Notes:
Damaged Fuel Maximum Pellet Enrichment (wt % U235)
: 1. The basket designator is included in the unit serial number
Basket Designator Boral 75%
: 2. The maximum pellet enrichment is the enrichment of the most highly enriched rod in the most highly enriched lattice Renewed TN-68 Technical Specifications                2.0-4                          Amendment No. 1
B10 credit Borated Aluminum and Metal Matrix Composites 90%
B10 credit 36 30 3.7 3.7 (none) 42 35 3.95 3.95 A
48 40 4.05 4.05 B
54 45 4.15 4.15 C
60 50 4.3 4.3 D
66 55 4.4 4.4 E
72 60 4.5 4.5 F
84 70 4.7 4.7 G
Notes:
1.
The basket designator is included in the unit serial number 2.
The maximum pellet enrichment is the enrichment of the most highly enriched rod in the most highly enriched lattice Renewed  


Functional and Operational Limits 2.0 Figure 2.1.1-1 Location of Damaged Fuel Compartments Note:
Functional and Operational Limits 2.0 TN-68 Technical Specifications 2.0-5 Amendment No. 1 Figure 2.1.1-1 Location of Damaged Fuel Compartments Note:
Damaged fuel is to be stored only in a basket configured with damaged fuel compartment extensions at the locations marked with an X.
Damaged fuel is to be stored only in a basket configured with damaged fuel compartment extensions at the locations marked with an X.
Renewed TN-68 Technical Specifications                2.0-5                          Amendment No. 1
Renewed  


Functional and Operational Limits 2.0 Figure 2.1.1-2 Flowchart for Selection of 8x8, 9x9, and 10x10 Fuel Notes:
Functional and Operational Limits 2.0 TN-68 Technical Specifications 2.0-6 Amendment No. 1 Figure 2.1.1-2 Flowchart for Selection of 8x8, 9x9, and 10x10 Fuel Notes:
: 1. Decay heat per formula on following page, or any method that yields decay heat values equivalent or more conservative (i.e., higher) than those given by the formula.
1.
: 2. Burnup and enrichment are bundle average, including axial blankets.
Decay heat per formula on following page, or any method that yields decay heat values equivalent or more conservative (i.e., higher) than those given by the formula.
2.
Burnup and enrichment are bundle average, including axial blankets.
(continued)
(continued)
Renewed TN-68 Technical Specifications                2.0-6                          Amendment No. 1
Renewed  


Functional and Operational Limits 2.0 Figure 2.1.1-2, continued The Decay Heat (DH) in watts is expressed as:
Functional and Operational Limits 2.0 TN-68 Technical Specifications 2.0-7 Amendment No. 1 Figure 2.1.1-2, continued The Decay Heat (DH) in watts is expressed as:
DH = F1*Exp({[1-(6.0/X3)]*G}*[(X3-6.0)^H]*[(X2/X1)^I])
DH = F1*Exp({[1-(6.0/X3)]*G}*[(X3-6.0)^H]*[(X2/X1)^I])
where F1 = A + B*X1 + C*X2 + D*X12 + E*X1*X2 + F*X22 and X1 =   Bundle Average Burnup in GWd/MTU X2 =   Initial Enrichment in wt % U235 X3 =   Cooling Time in Years A=     11.489825 B=     6.573922 C=     5.364592 D=     0.112665 E=     -1.248752 F=       4.262201 G=     -0.354672 H=       0.114847 I=     -0.188754 Renewed TN-68 Technical Specifications              2.0-7                        Amendment No. 1
where F1 = A + B*X1 + C*X2 + D*X12 + E*X1*X2 + F*X22 and X1 =
Bundle Average Burnup in GWd/MTU X2 =
Initial Enrichment in wt % U235 X3 =
Cooling Time in Years A =
11.489825 B =
6.573922 C =
5.364592 D =
0.112665 E =
-1.248752 F =
4.262201 G =
-0.354672 H =
0.114847 I =
-0.188754 Renewed  


LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1   LCOs shall be met during specified conditions in the Applicability, except as provided in LCO 3.0.2.
LCO Applicability 3.0 TN-68 Technical Specifications Amendment No. 1 3.0-1 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during specified conditions in the Applicability, except as provided in LCO 3.0.2.
LCO 3.0.2   Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5.
LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5.
If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.
If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.
LCO 3.0.3   Not applicable to a cask.
LCO 3.0.3 Not applicable to a cask.
LCO 3.0.4   When an LCO is not met, entry into a specified condition in the Applicability shall not be made except when the associated ACTIONS to be entered permit continued operation in the specified condition in the Applicability for an unlimited period of time. This Specification shall not prevent changes in specified conditions in the Applicability that are required to comply with ACTIONS or that are related to the unloading of the cask.
LCO 3.0.4 When an LCO is not met, entry into a specified condition in the Applicability shall not be made except when the associated ACTIONS to be entered permit continued operation in the specified condition in the Applicability for an unlimited period of time. This Specification shall not prevent changes in specified conditions in the Applicability that are required to comply with ACTIONS or that are related to the unloading of the cask.
Exceptions to this are stated in the individual Specifications. These exceptions allow entry into specified conditions in the Applicability when the associated ACTIONS to be entered allow operation in the specified condition in the Applicability only for a limited period of time.
Exceptions to this are stated in the individual Specifications. These exceptions allow entry into specified conditions in the Applicability when the associated ACTIONS to be entered allow operation in the specified condition in the Applicability only for a limited period of time.
LCO 3.0.5   Equipment removed from service or declared to not meet the LCO to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate it meets the LCO or that other equipment meets the LCO. This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate that the LCO is met.
LCO 3.0.5 Equipment removed from service or declared to not meet the LCO to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate it meets the LCO or that other equipment meets the LCO. This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate that the LCO is met.
LCO 3.0.6   Not applicable to a cask.
LCO 3.0.6 Not applicable to a cask.
LCO 3.0.7   Not applicable to a cask.
LCO 3.0.7 Not applicable to a cask.
Renewed TN-68 Technical Specifications                3.0-1                            Amendment No. 1
Renewed  


SR Applicability 3.0 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 3.0.1           SRs shall be met during the specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3. Surveillances do not have to be performed on equipment or variables outside specified limits.
SR Applicability 3.0 TN-68 Technical Specifications Amendment No. 1 3.0-2 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 3.0.1 SRs shall be met during the specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3. Surveillances do not have to be performed on equipment or variables outside specified limits.
SR 3.0.2           The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.
SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.
For Frequencies specified as "once", the above interval extension does not apply. If a Completion Time requires periodic performance on a "once per..." basis, the above Frequency extension applies to each performance after the initial performance.
For Frequencies specified as "once", the above interval extension does not apply. If a Completion Time requires periodic performance on a "once per..." basis, the above Frequency extension applies to each performance after the initial performance.
Exceptions to this Specification are stated in the individual Specifications.
Exceptions to this Specification are stated in the individual Specifications.
SR 3.0.3           If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours or up to the limit of the specified Frequency, whichever is less. This delay period is permitted to allow performance of the Surveillance.
SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours or up to the limit of the specified Frequency, whichever is less. This delay period is permitted to allow performance of the Surveillance.
If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.
If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.
When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, And the applicable Condition(s) must be entered.
When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, And the applicable Condition(s) must be entered.
SR 3.0.4           Entry into a specified condition in the Applicability of an LCO shall not be made unless the LCO's Surveillances have been met within their specified Frequency. This provision shall not prevent entry into specified conditions in the Applicability that are required to comply with ACTIONS or that are related to the unloading of a cask.
SR 3.0.4 Entry into a specified condition in the Applicability of an LCO shall not be made unless the LCO's Surveillances have been met within their specified Frequency. This provision shall not prevent entry into specified conditions in the Applicability that are required to comply with ACTIONS or that are related to the unloading of a cask.
Renewed TN-68 Technical Specifications                3.0-2                            Amendment No. 1
Renewed  


Cask Cavity Vacuum Drying 3.1.1 3.1 CASK INTEGRITY 3.1.1             Cask Cavity Vacuum Drying LCO 3.1.1                 The cask cavity vacuum drying pressure shall be sustained at or below 4 mbar absolute for a period of at least 30 minutes after isolation from the vacuum drying system.
Cask Cavity Vacuum Drying 3.1.1 TN-68 Technical Specifications Amendment No. 1 3.1.1-1 3.1 CASK INTEGRITY 3.1.1 Cask Cavity Vacuum Drying LCO 3.1.1 The cask cavity vacuum drying pressure shall be sustained at or below 4 mbar absolute for a period of at least 30 minutes after isolation from the vacuum drying system.
APPLICABILITY:           During LOADING OPERATIONS ACTIONS CONDITION                       REQUIRED ACTION                 COMPLETION TIME
APPLICABILITY:
  -------NOTE-------                -------NOTE-----------
During LOADING OPERATIONS ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME
Not applicable until SR           Action A.1 applies until helium is 3.1.1.1 is performed.             removed for subsequent
-------NOTE-------
  ----------------------            operations.
Not applicable until SR 3.1.1.1 is performed.
A. Cask cavity vacuum             --------------------------
A.
drying pressure limit not    A.1 Achieve or maintain a nominal       6 hours met.                              helium environment in the cask.
Cask cavity vacuum drying pressure limit not met.
AND A.2 Establish cask cavity drying       Prior to helium backfill pressure within limits.            (SR 3.1.2.1)
-------NOTE-----------
B. Required Action A.1           B.1 Return cask to pool and             7 days and associated                    reflood.
Action A.1 applies until helium is removed for subsequent operations.
Completion Time not met.
A.1 Achieve or maintain a nominal helium environment in the cask.
C. Required Action A.2 and       C.1 Return cask to pool and             30 days associated Completion              reflood.
AND A.2 Establish cask cavity drying pressure within limits.
Time not met.
6 hours Prior to helium backfill (SR 3.1.2.1)
Renewed TN-68 Technical Specifications                    3.1.1-1                          Amendment No. 1
B.
Required Action A.1 and associated Completion Time not met.
B.1 Return cask to pool and reflood.
7 days C. Required Action A.2 and associated Completion Time not met.
C.1 Return cask to pool and reflood.
30 days Renewed  


Cask Cavity Vacuum Drying 3.1.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                     FREQUENCY SR 3.1.1.1   Verify that the equilibrium cask cavity vacuum drying   < 22 kW:
Cask Cavity Vacuum Drying 3.1.1 TN-68 Technical Specifications Amendment No. 1 3.1.1-2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.1.1 Verify that the equilibrium cask cavity vacuum drying pressure is brought to # 4 mbar absolute for $ 30 minutes
pressure is brought to # 4 mbar absolute for $ 30       Once, prior to helium minutes                                                backfill (SR 3.1.2.1)
< 22 kW:
                                                                      > 22 kW:
Once, prior to helium backfill (SR 3.1.2.1)
> 22 kW:
Once, within 24 hours of completion of cask draining.
Once, within 24 hours of completion of cask draining.
or Once, prior to helium backfill (SR 3.1.2.1), if cask is evacuated to
or Once, prior to helium backfill (SR 3.1.2.1), if cask is evacuated to  
                                                                      < 50 mbar and backfilled with helium anytime prior to 24 hours from draining.
< 50 mbar and backfilled with helium anytime prior to 24 hours from draining.
Renewed TN-68 Technical Specifications              3.1.1-2                            Amendment No. 1
Renewed  


Cask Helium Backfill Pressure 3.1.2 3.1 CASK INTEGRITY 3.1.2             Cask Helium Backfill Pressure LCO 3.1.2               The cask cavity shall be filled with helium to a pressure of 2.0 atm absolute (+0/-10%).
Cask Helium Backfill Pressure 3.1.2 TN-68 Technical Specifications Amendment No. 1 3.1.2-1 3.1 CASK INTEGRITY 3.1.2 Cask Helium Backfill Pressure LCO 3.1.2 The cask cavity shall be filled with helium to a pressure of 2.0 atm absolute (+0/-10%).
APPLICABILITY:           During LOADING OPERATIONS.
APPLICABILITY:
ACTIONS CONDITION                       REQUIRED ACTION                 COMPLETION TIME
During LOADING OPERATIONS.
-------NOTE-------                -------NOTE-----------
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME
Not applicable until SR           Action A.1 applies until helium is 3.1.2.1 is performed.             removed for subsequent
-------NOTE-------
------------------                operations A. Cask initial helium             ----------------------
Not applicable until SR 3.1.2.1 is performed.
backfill pressure limit      A.1 Achieve or maintain a not met.                          nominal helium environment       Immediately in the cask AND A.2 Establish cask cavity backfill pressure within limits.           Prior to leak testing (SR 3.1.3.1)
A.
B. Required Action A.1         B.1 Return cask to pool and             7 days and Associated                    reflood.
Cask initial helium backfill pressure limit not met.
Completion Time not met.
-------NOTE-----------
C. Required Action A.2          C.1 Return cask to pool and             30 days and associated                    reflood.
Action A.1 applies until helium is removed for subsequent operations A.1 Achieve or maintain a nominal helium environment in the cask AND A.2 Establish cask cavity backfill pressure within limits.
Completion Time not met.
Immediately Prior to leak testing (SR 3.1.3.1)
Renewed TN-68 Technical Specifications                      3.1.2-1                          Amendment No. 1
B.
Required Action A.1 and Associated Completion Time not met.
B.1 Return cask to pool and reflood.
7 days C.
Required Action A.2 and associated Completion Time not met.
C.1 Return cask to pool and reflood.
30 days Renewed  


Cask Helium Backfill Pressure 3.1.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                     FREQUENCY SR 3.1.2.1   Verify that the cask cavity helium pressure is 2.0     < 22 kW:
Cask Helium Backfill Pressure 3.1.2 TN-68 Technical Specifications Amendment No. 1 3.1.2-2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.2.1 Verify that the cask cavity helium pressure is 2.0 atm absolute (+0/-10%).
atm absolute (+0/-10%).                               Once, prior to leak testing (SR 3.1.3.1)
< 22 kW:
                                                                    > 22 kW:
Once, prior to leak testing (SR 3.1.3.1)
> 22 kW:
Once, within 30 hours of completion of cask draining.
Once, within 30 hours of completion of cask draining.
or Once, prior to leak testing (SR 3.1.3.1) if the cask is backfilled with helium after vacuum drying (SR 3.1.1.1).
or Once, prior to leak testing (SR 3.1.3.1) if the cask is backfilled with helium after vacuum drying (SR 3.1.1.1).
Renewed TN-68 Technical Specifications              3.1.2-2                          Amendment No. 1
Renewed  


Cask Helium Leak Rate 3.1.3 3.1 CASK INTEGRITY 3.1.3             Cask Helium Leak Rate LCO 3.1.3         The combined helium leak rate for all closure seals shall not exceed 1.0 E-5 ref-cc/sec.
Cask Helium Leak Rate 3.1.3 TN-68 Technical Specifications Amendment No. 1 3.1.3-1 3.1 CASK INTEGRITY 3.1.3 Cask Helium Leak Rate LCO 3.1.3 The combined helium leak rate for all closure seals shall not exceed 1.0 E-5 ref-cc/sec.
APPLICABILITY:             During LOADING OPERATIONS.
APPLICABILITY:
ACTIONS CONDITION                       REQUIRED ACTION                   COMPLETION TIME
During LOADING OPERATIONS.
------NOTE-------
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME
------NOTE-------
Not applicable until SR 3.1.3.1 is performed.
Not applicable until SR 3.1.3.1 is performed.
A. Cask helium leak rate not met.                       A.1 Establish cask helium leak       7 days rate within limit.
A.
B. Required Action A.1           B.1 Return cask to pool and         30 days and Associated                    reflood.
Cask helium leak rate not met.
Completion Time not met.
A.1 Establish cask helium leak rate within limit.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                       FREQUENCY SR 3.1.3.1         Verify cask helium leak rate is within limit.           Once, prior to TRANSPORT OPERATIONS.
7 days B.
Renewed TN-68 Technical Specifications                    3.1.3-1                          Amendment No. 1
Required Action A.1 and Associated Completion Time not met.
B.1 Return cask to pool and reflood.
30 days SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.3.1 Verify cask helium leak rate is within limit.
Once, prior to TRANSPORT OPERATIONS.
Renewed  


Combined Helium Leak Rate 3.1.4 3.1 CASK INTEGRITY 3.1.4               Combined Helium Leak Rate LCO 3.1.4                   The combined helium leak rate for all closure seals and the overpressure system shall not exceed 1.0 E-5 ref-cc/sec.
Combined Helium Leak Rate 3.1.4 TN-68 Technical Specifications Amendment No. 1 3.1.4-1 3.1 CASK INTEGRITY 3.1.4 Combined Helium Leak Rate LCO 3.1.4 The combined helium leak rate for all closure seals and the overpressure system shall not exceed 1.0 E-5 ref-cc/sec.
APPLICABILITY:               During STORAGE OPERATIONS.
APPLICABILITY:
During STORAGE OPERATIONS.
ACTIONS
ACTIONS
------------------------NOTE-------------------------------------------------------------------------------------------
------------------------NOTE-------------------------------------------------------------------------------------------
Separate Condition entry is allowed for each cask.
Separate Condition entry is allowed for each cask.
CONDITION                             REQUIRED ACTION                           COMPLETION TIME
CONDITION REQUIRED ACTION COMPLETION TIME
  -------NOTE-------
-------NOTE-------
Not applicable until SR 3.1.4.1 is performed.
Not applicable until SR 3.1.4.1 is performed.
A. Combined helium leak rate not met.                     A.1 Establish combined helium                   48 hours leak rate within limit.
A.
B. Required Action A.1               B.1 Return cask to spent fuel                   30 days and Associated                            unloading facility Completion Time not met.
Combined helium leak rate not met.
Renewed TN-68 Technical Specifications                            3.1.4-1                                    Amendment No. 1
A.1 Establish combined helium leak rate within limit.
48 hours B.
Required Action A.1 and Associated Completion Time not met.
B.1 Return cask to spent fuel unloading facility 30 days Renewed  


Combined Helium Leak Rate 3.1.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                 FREQUENCY
Combined Helium Leak Rate 3.1.4 TN-68 Technical Specifications Amendment No. 1 3.1.4-2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY
-----------------NOTE---------------------------------------------------------------     Once, prior to This surveillance may be combined with SR 3.1.3.1.                                       TRANSPORT
-----------------NOTE---------------------------------------------------------------
----------------------------------------------------------------------------------------  OPERATIONS SR 3.1.4.1         Verify the combined helium leak rate is within the limit.                                                                 OR Once within 48 hours of commencing STORAGE OPERATIONS.
This surveillance may be combined with SR 3.1.3.1.
Renewed TN-68 Technical Specifications                            3.1.4-2                                Amendment No. 1
SR 3.1.4.1 Verify the combined helium leak rate is within the limit.
Once, prior to TRANSPORT OPERATIONS OR Once within 48 hours of commencing STORAGE OPERATIONS.
Renewed  


Cask Interseal Pressure 3.1.5 3.1       CASK INTEGRITY 3.1.5     Cask Interseal Pressure LCO 3.1.5         Cask interseal pressure shall be maintained at a pressure of at least 3.0 atm absolute.
Cask Interseal Pressure 3.1.5 TN-68 Technical Specifications Amendment No. 1 3.1.5-1 3.1 CASK INTEGRITY 3.1.5 Cask Interseal Pressure LCO 3.1.5 Cask interseal pressure shall be maintained at a pressure of at least 3.0 atm absolute.
APPLICABILITY:             During STORAGE OPERATIONS.
APPLICABILITY:
During STORAGE OPERATIONS.
ACTIONS
ACTIONS
----------------------------NOTE-----------------------------------------------------------------------------------------
----------------------------NOTE-----------------------------------------------------------------------------------------
Separate Condition entry is allowed for each cask.
Separate Condition entry is allowed for each cask.
CONDITION                           REQUIRED ACTION                           COMPLETION TIME A.       Cask interseal             A.1       Restore cask interseal                 7 days pressure below limit.                pressure above limit.
CONDITION REQUIRED ACTION COMPLETION TIME A.
B.       Required Action A.1         B.1       Return cask to spent fuel             30 days and Associated                        unloading facility Completion Time not met.
Cask interseal pressure below limit.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                   FREQUENCY SR 3.1.5.1         Verify cask interseal helium pressure above limit.                 7 days SR 3.1.5.2         Perform a CHANNEL OPERATIONAL TEST (COT)                           Once, within 7 days of to verify proper functioning of pressure                           commencing switch/transducer on cask overpressure system.                     STORAGE OPERATIONS and every 36 months Renewed TN-68 Technical Specifications                        3.1.5-1                                    Amendment No. 1
A.1 Restore cask interseal pressure above limit.
7 days B.
Required Action A.1 and Associated Completion Time not met.
B.1 Return cask to spent fuel unloading facility 30 days SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.5.1 Verify cask interseal helium pressure above limit.
7 days SR 3.1.5.2 Perform a CHANNEL OPERATIONAL TEST (COT) to verify proper functioning of pressure switch/transducer on cask overpressure system.
Once, within 7 days of commencing STORAGE OPERATIONS and every 36 months Renewed  


Cask Minimum Lifting Temperature 3.1.6 3.1     CASK INTEGRITY 3.1.6   Cask Minimum Lifting Temperature LCO 3.1.6                   The loaded cask shall not be lifted if the outer surface of the cask is below -20EF.
Cask Minimum Lifting Temperature 3.1.6 TN-68 Technical Specifications Amendment No. 1 3.1.6-1 3.1 CASK INTEGRITY 3.1.6 Cask Minimum Lifting Temperature LCO 3.1.6 The loaded cask shall not be lifted if the outer surface of the cask is below -20EF.
APPLICABILITY:             During TRANSPORT OPERATIONS.
APPLICABILITY:
ACTIONS CONDITION                             REQUIRED ACTION                           COMPLETION TIME A.       Cask surface                   A.1     Lower cask to safe                   Immediately temperature below                        position.
During TRANSPORT OPERATIONS.
limit.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                     FREQUENCY Once, immediately prior
Cask surface temperature below limit.
----------------------------------------------------------------------------------------  to lifting cask and prior NOTE: This surveillance does not need to be performed if                                 to cask transfer to or temperature is known to be above freezing.                                               from ISFSI SR 3.1.6.1         Verify outer surface temperature is above limit.
A.1 Lower cask to safe position.
Renewed TN-68 Technical Specifications                            3.1.6-1                                    Amendment No. 1
Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY NOTE: This surveillance does not need to be performed if temperature is known to be above freezing.
SR 3.1.6.1 Verify outer surface temperature is above limit.
Once, immediately prior to lifting cask and prior to cask transfer to or from ISFSI Renewed  


Cask Surface Contamination 3.2.1 3.2     CASK RADIATION PROTECTION 3.2.1   Cask Surface Contamination LCO 3.2.1                 Removable contamination on the cask exterior surfaces shall not exceed:
Cask Surface Contamination 3.2.1 TN-68 Technical Specifications Amendment No. 1 3.2.1-1 3.2 CASK RADIATION PROTECTION 3.2.1 Cask Surface Contamination LCO 3.2.1 Removable contamination on the cask exterior surfaces shall not exceed:
: a.     1000 dpm/100 cm2 (0.2 Bq/cm2) from beta and gamma sources; and
a.
: b.     20 dpm/100 cm2 (0.003 Bq/cm2) from alpha sources.
1000 dpm/100 cm2 (0.2 Bq/cm2) from beta and gamma sources; and b.
APPLICABILITY:             During LOADING OPERATIONS.
20 dpm/100 cm2 (0.003 Bq/cm2) from alpha sources.
ACTIONS CONDITION                       REQUIRED ACTION               COMPLETION TIME
APPLICABILITY:
------NOTE-------
During LOADING OPERATIONS.
Not applicable until SR             A.1    Decontaminate cask          Prior to TRANSPORT 3.2.1.1 is performed.                      surfaces to below required  OPERATIONS.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME
---------------------                      levels.
------NOTE-------
A.        Removable contamination on the cask exterior surface exceeds either limit.
Not applicable until SR 3.2.1.1 is performed.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                     FREQUENCY SR 3.2.1.1         Verify that the removable contamination on the         Once, prior to exterior surface of the cask does not exceed the       TRANSPORT specified limits.                                     OPERATIONS Renewed TN-68 Technical Specifications                    3.2.1-1                          Amendment No. 1
A.
Removable contamination on the cask exterior surface exceeds either limit.
A.1 Decontaminate cask surfaces to below required levels.
Prior to TRANSPORT OPERATIONS.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.1.1 Verify that the removable contamination on the exterior surface of the cask does not exceed the specified limits.
Once, prior to TRANSPORT OPERATIONS Renewed  


Design Features 4.0 4.0     DESIGN FEATURES The Specifications in this section include the design characteristics of special importance to each of the physical barriers and to maintenance of safety margins in the cask design. The principle objective of this category is to describe the design envelope that constrains any physical changes to essential equipment. Included in this category are the site environmental parameters which provide the bases for design, but are not inherently suited for description as LCOs.
Design Features 4.0 TN-68 Technical Specifications Amendment No. 1 3.0-1 4.0 DESIGN FEATURES The Specifications in this section include the design characteristics of special importance to each of the physical barriers and to maintenance of safety margins in the cask design. The principle objective of this category is to describe the design envelope that constrains any physical changes to essential equipment. Included in this category are the site environmental parameters which provide the bases for design, but are not inherently suited for description as LCOs.
4.1     Storage Cask 4.1.1 Criticality The design of the storage cask, including spatial constraints on adjacent assemblies (minimum basket opening of 5.97 inches by 5.97 inches) and boron content of the basket material (minimum areal density per Table 2.1.1-2) shall ensure that fuel assemblies are maintained in a subcritical condition with a keff of less than 0.95 under all conditions of operation.
4.1 Storage Cask 4.1.1 Criticality The design of the storage cask, including spatial constraints on adjacent assemblies (minimum basket opening of 5.97 inches by 5.97 inches) and boron content of the basket material (minimum areal density per Table 2.1.1-2) shall ensure that fuel assemblies are maintained in a subcritical condition with a keff of less than 0.95 under all conditions of operation.
Neutron Absorber Tests Boron Aluminum Alloy (Borated Aluminum), Boron Carbide/Aluminum Metal Matrix Composites (MMCs) or Boral shall be supplied in accordance with FSAR sections 9.1.7.1, 9.1.7.2, 9.1.7.3, 9.4.2, 9.4.3.5, and 9.4.4.3. These sections of the FSAR are hereby incorporated into the TN-68 CoC.
Neutron Absorber Tests Boron Aluminum Alloy (Borated Aluminum), Boron Carbide/Aluminum Metal Matrix Composites (MMCs) or Boral shall be supplied in accordance with FSAR sections 9.1.7.1, 9.1.7.2, 9.1.7.3, 9.4.2, 9.4.3.5, and 9.4.4.3. These sections of the FSAR are hereby incorporated into the TN-68 CoC.
4.1.2 Structural Performance The cask has been evaluated for a cask tipover (equivalent to a side drop of 65 g's) and a bottom end drop resulting in an axial gravitational (g) loading of 60 g's.
4.1.2 Structural Performance The cask has been evaluated for a cask tipover (equivalent to a side drop of 65 g's) and a bottom end drop resulting in an axial gravitational (g) loading of 60 g's.
4.1.3 Codes and Standards The American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section III, 1995 Edition with Addenda through 1996, is the governing Code for the TN-68 Cask, except that the material properties from later editions of Section II Part D may be used for design.
4.1.3 Codes and Standards The American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section III, 1995 Edition with Addenda through 1996, is the governing Code for the TN-68 Cask, except that the material properties from later editions of Section II Part D may be used for design.
The TN-68 cask confinement boundary is designed, fabricated and inspected in accordance with Subsection NB of the ASME Code to the maximum practical extent. Alternatives to the code are listed in Table 4.1-1.
The TN-68 cask confinement boundary is designed, fabricated and inspected in accordance with Subsection NB of the ASME Code to the maximum practical extent. Alternatives to the code are listed in Table 4.1-1.
The TN-68 basket is designed, fabricated and inspected in accordance with Subsection NG of the ASME Code to the maximum practical extent.
The TN-68 basket is designed, fabricated and inspected in accordance with Subsection NG of the ASME Code to the maximum practical extent.
Alternatives to the code are listed in Table 4.1-1.
Alternatives to the code are listed in Table 4.1-1.
The ASME code requirements apply only to important to safety items.
The ASME code requirements apply only to important to safety items.
Renewed TN-68 Technical Specifications                    4.0-1 3.0-1                            Amendment No. 1
Renewed 4.0-1


Design Features 4.0 Proposed alternatives to ASME Code Section III, 1995 Edition with Addenda through 1996 including alternatives allowed by Table 4.1-1 may be used when authorized by the Director of the Office of Nuclear Material Safety and Safeguards or Designee. The applicant should demonstrate that:
Design Features 4.0 TN-68 Technical Specifications Amendment No. 1 4.0-2 Proposed alternatives to ASME Code Section III, 1995 Edition with Addenda through 1996 including alternatives allowed by Table 4.1-1 may be used when authorized by the Director of the Office of Nuclear Material Safety and Safeguards or Designee. The applicant should demonstrate that:
: 1.       The proposed alternatives would provide an acceptable level of quality and safety, or
1.
: 2.       Compliance with the specified requirements of ASME Code Section III, 1995 Edition with Addenda through 1996, would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
The proposed alternatives would provide an acceptable level of quality and safety, or 2.
Compliance with the specified requirements of ASME Code Section III, 1995 Edition with Addenda through 1996, would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Requests for alternatives in accordance with this section should be submitted in accordance with 10 CFR 72.4.
Requests for alternatives in accordance with this section should be submitted in accordance with 10 CFR 72.4.
4.1.4 Helium Purity The cask shall be filled with helium with a purity of at least 99.99%. This level of purity will ensure that the residual impurities in the cask cavity will be less than 1 mole.
4.1.4 Helium Purity The cask shall be filled with helium with a purity of at least 99.99%. This level of purity will ensure that the residual impurities in the cask cavity will be less than 1 mole.
4.2   Storage Pad 4.2.1 Storage Locations for Casks Casks shall be spaced a minimum of 14 feet apart, center to center. This minimum spacing will ensure the proper dissipation of radiant heat energy from an array of casks as assumed in the TN-68 Safety Analysis Report.
4.2 Storage Pad 4.2.1 Storage Locations for Casks Casks shall be spaced a minimum of 14 feet apart, center to center. This minimum spacing will ensure the proper dissipation of radiant heat energy from an array of casks as assumed in the TN-68 Safety Analysis Report.
The casks may be spaced more closely if the Certificate Holder or Licensee performs a thermal analysis, in accordance with the methodology described in Section 4.10.1.2 of the SAR, to demonstrate that the cask surface temperature will not exceed 255EF under the site specific ambient temperatures and the cask contents decay heat; but in no case casks can be spaced closer than 12 feet on center.
The casks may be spaced more closely if the Certificate Holder or Licensee performs a thermal analysis, in accordance with the methodology described in Section 4.10.1.2 of the SAR, to demonstrate that the cask surface temperature will not exceed 255EF under the site specific ambient temperatures and the cask contents decay heat; but in no case casks can be spaced closer than 12 feet on center.
Renewed TN-68 Technical Specifications                4.0-2                              Amendment No. 1
Renewed  


Design Features 4.0 4.3   ISFSI Specific Parameters and Analyses ISFSI specific parameters and analyses that shall need verification by the system user are, as a minimum, as follows:
Design Features 4.0 TN-68 Technical Specifications Amendment No. 1 4.0-3 4.3 ISFSI Specific Parameters and Analyses ISFSI specific parameters and analyses that shall need verification by the system user are, as a minimum, as follows:
: 1. Tornado maximum wind speeds:             360 mph
1.
: 2. Flood levels up to 57 feet and drag forces up to 45,290 lbs.
Tornado maximum wind speeds:
: 3. Seismic loads on the ISFSI pad of up to 0.26g horizontal and 0.17g vertical.
360 mph 2.
: 4. Average daily ambient temperatures:     $ -20EF minimum; #100EF maximum
Flood levels up to 57 feet and drag forces up to 45,290 lbs.
: 5. The potential for fires and explosions shall be addressed, based on site-specific considerations. Fires and explosions should be bounded by the cask design bases parameters of 200 gallons of fuel (in the tank of the transporter vehicle) and an external pressure of 25 psig.
3.
: 6. Supplemental Shielding: In cases where engineered features (i.e. berms, shield walls) are used to ensure that the requirements of 10 CFR 72.104(a) are met, such features are to be considered Important to Safety and must be evaluated to determine the applicable Quality Assurance Category.
Seismic loads on the ISFSI pad of up to 0.26g horizontal and 0.17g vertical.
Renewed TN-68 Technical Specifications              4.0-3                            Amendment No. 1
4.
Average daily ambient temperatures:
$ -20EF minimum; #100EF maximum 5.
The potential for fires and explosions shall be addressed, based on site-specific considerations. Fires and explosions should be bounded by the cask design bases parameters of 200 gallons of fuel (in the tank of the transporter vehicle) and an external pressure of 25 psig.
6.
Supplemental Shielding: In cases where engineered features (i.e. berms, shield walls) are used to ensure that the requirements of 10 CFR 72.104(a) are met, such features are to be considered Important to Safety and must be evaluated to determine the applicable Quality Assurance Category.
Renewed  


Design Features 4.0 Table 4.1-1 TN-68 ASME Code Alternatives The cask confinement boundary is designed, fabricated and inspected in accordance with the ASME Code Subsection NB to the maximum practical extent. The basket is designed, fabricated and inspected in accordance with ASME Code Subsection NG to the maximum practical extent. The gamma shielding, which is primarily for shielding, but also provides structural support to the confinement boundary during accident events, was designed in accordance with Subsection NF of the code. Inspections of the gamma shielding are performed in accordance with ASME code Subsection NF as detailed in the SAR. Other cask components, such as the protective cover, outer shell and neutron shielding are not governed by the ASME Code.
Design Features 4.0 TN-68 Technical Specifications Amendment No. 1 4.0-4 Table 4.1-1 TN-68 ASME Code Alternatives The cask confinement boundary is designed, fabricated and inspected in accordance with the ASME Code Subsection NB to the maximum practical extent. The basket is designed, fabricated and inspected in accordance with ASME Code Subsection NG to the maximum practical extent. The gamma shielding, which is primarily for shielding, but also provides structural support to the confinement boundary during accident events, was designed in accordance with Subsection NF of the code. Inspections of the gamma shielding are performed in accordance with ASME code Subsection NF as detailed in the SAR. Other cask components, such as the protective cover, outer shell and neutron shielding are not governed by the ASME Code.
Component           Reference ASME         Code Requirement         Alternative, Justification & Compensatory Measures Code/Section TN-68 Cask             NB/NG -1100/       Stamping and               The TN-68 cask is not N stamped, nor is there a code and Basket          Subsection NCA      preparation of reports    design specification or stress report generated. A NB/NG - 2000        by the Certificate        design criteria document is generated in accordance Holder, Surveillances,    with TNs QA Program and the design and analysis is Use of ASME                performed under TNs QA Program and presented in the Certificate Holders        SAR. The cask may also be fabricated by other than N-stamp holders and materials may be supplied by other than ASME Certificate holders. Surveillances are performed by TN and utility personnel rather than by an Authorized Nuclear Inspector (ANI)
Component Reference ASME Code/Section Code Requirement Alternative, Justification & Compensatory Measures TN-68 Cask and Basket NB/NG -1100/
TN-68 Cask               NCA-3800         QA Requirements           The quality assurance requirements of NQA-1 or 10 and Basket                                                          CFR 72 Subpart G are imposed in lieu of NCA-3800 requirements.
Subsection NCA NB/NG - 2000 Stamping and preparation of reports by the Certificate Holder, Surveillances, Use of ASME Certificate Holders The TN-68 cask is not N stamped, nor is there a code design specification or stress report generated. A design criteria document is generated in accordance with TNs QA Program and the design and analysis is performed under TNs QA Program and presented in the SAR. The cask may also be fabricated by other than N-stamp holders and materials may be supplied by other than ASME Certificate holders. Surveillances are performed by TN and utility personnel rather than by an Authorized Nuclear Inspector (ANI)
Lid Bolts             NB-3232.3         Fatigue analysis of bolts A fatigue analysis of the bolts is not performed for storage, since the bolts are not subject to significant cyclical loads.
TN-68 Cask and Basket NCA-3800 QA Requirements The quality assurance requirements of NQA-1 or 10 CFR 72 Subpart G are imposed in lieu of NCA-3800 requirements.
Renewed TN-68 Technical Specifications                                    4.0-4                                                Amendment No. 1
Lid Bolts NB-3232.3 Fatigue analysis of bolts A fatigue analysis of the bolts is not performed for storage, since the bolts are not subject to significant cyclical loads.
Renewed  


Design Features 4.0 Table 4.1-1 TN-68 ASME Code Alternatives Component           Reference ASME   Code Requirement       Alternative, Justification & Compensatory Measures Code/Section Confinement Vessel           NB-6200   Hydrostatic Testing       The confinement vessel is hydrostatically tested in accordance with the requirements of the ASME B&PV Code, Section III, Article NB-6200 with the exception that the confinement vessel is installed in the gamma shield shell during testing. The confinement vessel is supported by the gamma shield during all design and accident events.
Design Features 4.0 Table 4.1-1 TN-68 ASME Code Alternatives TN-68 Technical Specifications Amendment No. 1 4.0-5 Component Reference ASME Code/Section Code Requirement Alternative, Justification & Compensatory Measures Confinement Vessel NB-6200 Hydrostatic Testing The confinement vessel is hydrostatically tested in accordance with the requirements of the ASME B&PV Code, Section III, Article NB-6200 with the exception that the confinement vessel is installed in the gamma shield shell during testing. The confinement vessel is supported by the gamma shield during all design and accident events.
Weld of bottom inner         NB-5231   Full penetration corner   The required UT inspection will be performed on a best plate to the                      welded joints require    efforts basis. The joint will be examined by RT and confinement shell                    the fusion zone and the  either PT or MT methods in accordance with ASME parent metal beneath      Subsection NB requirements. The joint may be welded the attachment surface    after the confinement shell is shrink fitted into the to be UT after welding. gamma shield shell. The geometry of the joint may not allow for UT inspection.
Weld of bottom inner plate to the confinement shell NB-5231 Full penetration corner welded joints require the fusion zone and the parent metal beneath the attachment surface to be UT after welding.
Confinement Shell           NB-4213   The rolling process       If the plates are made from less than three heats, each Rolling Qualification                  used to form the inner   heat will be tested to verify the impact properties.
The required UT inspection will be performed on a best efforts basis. The joint will be examined by RT and either PT or MT methods in accordance with ASME Subsection NB requirements. The joint may be welded after the confinement shell is shrink fitted into the gamma shield shell. The geometry of the joint may not allow for UT inspection.
vessel should be qualified to determine that the required impact properties of NB-2300 are met after straining by taking test specimens from three different heats.
Confinement Shell Rolling Qualification NB-4213 The rolling process used to form the inner vessel should be qualified to determine that the required impact properties of NB-2300 are met after straining by taking test specimens from three different heats.
Confinement Vessel           NB-7000   Vessels are required to   No overpressure protection is provided. Function of have overpressure        confinement vessel is to contain radioactive contents protection                under normal, off-normal and accident conditions of storage. Confinement vessel is designed to withstand maximum internal pressure considering 100% fuel rod failure and maximum accident temperatures.
If the plates are made from less than three heats, each heat will be tested to verify the impact properties.
Renewed TN-68 Technical Specifications                            4.0-5                                                Amendment No. 1
Confinement Vessel NB-7000 Vessels are required to have overpressure protection No overpressure protection is provided. Function of confinement vessel is to contain radioactive contents under normal, off-normal and accident conditions of storage. Confinement vessel is designed to withstand maximum internal pressure considering 100% fuel rod failure and maximum accident temperatures.
Renewed  


Design Features 4.0 Table 4.1-1 TN-68 ASME Code Alternatives Component           Reference ASME   Code Requirement         Alternative, Justification & Compensatory Measures Code/Section Confinement Vessel         NB/NG-8000 Requirements for         TN-68 cask is to be marked and identified in accordance and Basket                        nameplates, stamping      with 10 CFR72 requirements. Code stamping is not and reports per NCA-      required. QA data package to be in accordance with 8000                      Transnuclear approved QA program.
Design Features 4.0 Table 4.1-1 TN-68 ASME Code Alternatives TN-68 Technical Specifications Amendment No. 1 4.0-6 Component Reference ASME Code/Section Code Requirement Alternative, Justification & Compensatory Measures Confinement Vessel and Basket NB/NG-8000 Requirements for nameplates, stamping and reports per NCA-8000 TN-68 cask is to be marked and identified in accordance with 10 CFR72 requirements. Code stamping is not required. QA data package to be in accordance with Transnuclear approved QA program.
Confinement Vessel           NB-1131   The design specification A code design specification was not prepared for the shall define the          TN-68 cask. A TN design criteria was prepared in boundary of a            accordance with TNs QA program. The confinement component to which        boundary is specified in Chapter 1 of the SAR.
Confinement Vessel NB-1131 The design specification shall define the boundary of a component to which other component is attached.
other component is attached.
A code design specification was not prepared for the TN-68 cask. A TN design criteria was prepared in accordance with TNs QA program. The confinement boundary is specified in Chapter 1 of the SAR.
Basket poison and           NG-2000   Use of ASME Materials     The poison material and the aluminum plates are not aluminum plates                                                used for structural analysis, but to provide criticality control and heat transfer. They are not code materials.
Basket poison and aluminum plates NG-2000 Use of ASME Materials The poison material and the aluminum plates are not used for structural analysis, but to provide criticality control and heat transfer. They are not code materials.
Basket Rails             NG-2000   Use of ASME Materials     The fuel basket rail material is not a Class 1 material. It was selected for its properties. Aluminum has excellent thermal conductivity and a high strength to weight ratio.
Basket Rails NG-2000 Use of ASME Materials The fuel basket rail material is not a Class 1 material. It was selected for its properties. Aluminum has excellent thermal conductivity and a high strength to weight ratio.
NUREG-3854 and 1617 allow materials other than ASME Code materials to be used in the cask fabrication.
NUREG-3854 and 1617 allow materials other than ASME Code materials to be used in the cask fabrication.
ASME Code does provide the material properties for the aluminum alloy up to 400&deg;F and also allows the material to be used for Section III applications (Class 2 and 3).
ASME Code does provide the material properties for the aluminum alloy up to 400&deg;F and also allows the material to be used for Section III applications (Class 2 and 3).
The construction of the aluminum rails will meet the requirements of Section III, Subsection NG.
The construction of the aluminum rails will meet the requirements of Section III, Subsection NG.
Renewed TN-68 Technical Specifications                            4.0-6                                              Amendment No. 1
Renewed  


Design Features 4.0 Table 4.1-1 TN-68 ASME Code Alternatives Component           Reference ASME   Code Requirement         Alternative, Justification & Compensatory Measures Code/Section Basket Compartment           NG-5231   Table NG-3352-1             If these welds are made in a single pass, the longitudinal weld joint                specifies that in order to  requirement of NG-5231 is satisfied by surface utilize a quality factor of examination on the outside of the compartment, and the 0.9 for a full penetration  inside for one diameters length from each end.
Design Features 4.0 Table 4.1-1 TN-68 ASME Code Alternatives TN-68 Technical Specifications Amendment No. 1 4.0-7 Component Reference ASME Code/Section Code Requirement Alternative, Justification & Compensatory Measures Basket Compartment longitudinal weld joint NG-5231 Table NG-3352-1 specifies that in order to utilize a quality factor of 0.9 for a full penetration weld, examination must be in accordance with NG-5231. NG-5231 specifies that either a liquid penetrant or magnetic particle examination be performed of the root, each subsequent layer, and on the external weld surfaces and adjacent base material for 1/2" on each side of the weld.
weld, examination must      Automated autogenous PAW welds followed by be in accordance with      autogenous GTAW in the same pass through the NG-5231. NG-5231            welding equipment may be regarded as a single pass in specifies that either a    accordance with Code Case N-642.
If these welds are made in a single pass, the requirement of NG-5231 is satisfied by surface examination on the outside of the compartment, and the inside for one diameters length from each end.
liquid penetrant or magnetic particle          This is a clarification, not an alternative.
Automated autogenous PAW welds followed by autogenous GTAW in the same pass through the welding equipment may be regarded as a single pass in accordance with Code Case N-642.
examination be performed of the root, each subsequent layer, and on the external weld surfaces and adjacent base material for 1/2" on each side of the weld.
This is a clarification, not an alternative.
Basket Fusion (Spot)         NG-3352   NG-3352 specifies           The fusion (spot) welds are not included in the Welds                          permissible types of        permissible weld types listed in NG-3352.
Basket Fusion (Spot)
welded joints and their examination                The welds near the end of each tube are examined by direct visual inspection to the acceptance criteria of NG-NG-4330  NG-4330 requires weld      5360; the remaining welds are examined by remote qualification in            visual inspection using auxiliary lighting, mirrors, accordance with ASME        boroscopes, or other remote visual instruments.
Welds NG-3352 NG-4330 NG-3352 specifies permissible types of welded joints and their examination NG-4330 requires weld qualification in accordance with ASME Section IX The fusion (spot) welds are not included in the permissible weld types listed in NG-3352.
Section IX ASME Section IX does not provide qualification tests for this type of weld. The weld is qualified following Section IX to the degree applicable, supplemented by mechanical testing as specified on drawing 972-70-5, note 1.
The welds near the end of each tube are examined by direct visual inspection to the acceptance criteria of NG-5360; the remaining welds are examined by remote visual inspection using auxiliary lighting, mirrors, boroscopes, or other remote visual instruments.
Renewed TN-68 Technical Specifications                              4.0-7                                                Amendment No. 1
ASME Section IX does not provide qualification tests for this type of weld. The weld is qualified following Section IX to the degree applicable, supplemented by mechanical testing as specified on drawing 972-70-5, note 1.
Renewed  


Administrative Controls 5.0 5.0   ADMINISTRATIVE CONTROLS 5.1   Training Module Training modules shall be developed under the general licensees training program as required by 10 CFR 72.212(b)(6). Training modules shall require a comprehensive program for the operation and maintenance of the TN-68 spent fuel storage cask and the independent spent fuel storage installation (ISFSI). The training modules shall include the following elements, at a minimum:
Administrative Controls 5.0 TN-68 Technical Specifications Amendment No. 1 5.0-1 5.0 ADMINISTRATIVE CONTROLS 5.1 Training Module Training modules shall be developed under the general licensees training program as required by 10 CFR 72.212(b)(6). Training modules shall require a comprehensive program for the operation and maintenance of the TN-68 spent fuel storage cask and the independent spent fuel storage installation (ISFSI). The training modules shall include the following elements, at a minimum:
* TN-68 cask design (overview)
TN-68 cask design (overview)
* ISFSI Facility design (overview)
ISFSI Facility design (overview)
* Systems, Structures, and Components Important to Safety (overview)
Systems, Structures, and Components Important to Safety (overview)
* TN-68 Dry Storage Cask Safety Analysis Report (overview)
TN-68 Dry Storage Cask Safety Analysis Report (overview)
* NRC Safety Evaluation Report (overview)
NRC Safety Evaluation Report (overview)
* Certificate of Compliance conditions
Certificate of Compliance conditions TN-68 Technical Specifications Applicable Regulatory Requirements (e.g.,10 CFR72, Subpart K, 10CFR 20, 10 CFR Part 73)
* TN-68 Technical Specifications
Required Instrumentation and Use Operating Experience Reviews TN-68 Cask Operating and Maintenance procedures, including:
* Applicable Regulatory Requirements (e.g.,10 CFR72, Subpart K, 10CFR 20, 10 CFR Part 73)
* Required Instrumentation and Use
* Operating Experience Reviews
* TN-68 Cask Operating and Maintenance procedures, including:
Fuel qualification and loading Rigging and handling Loading Operations as described in Chapter 8 of the SAR Unloading Operations including reflooding as described in Chapter 8 of the SAR Auxiliary equipment operations and maintenance (i.e. vacuum drying, helium backfilling and leak testing, reflooding)
Fuel qualification and loading Rigging and handling Loading Operations as described in Chapter 8 of the SAR Unloading Operations including reflooding as described in Chapter 8 of the SAR Auxiliary equipment operations and maintenance (i.e. vacuum drying, helium backfilling and leak testing, reflooding)
Transfer operations including loading and unloading of the Transport Vehicle ISFSI Surveillance operations Radiation Protection Maintenance Security Off-normal and accident conditions, responses and corrective actions.
Transfer operations including loading and unloading of the Transport Vehicle ISFSI Surveillance operations Radiation Protection Maintenance Security Off-normal and accident conditions, responses and corrective actions.
Renewed TN-68 Technical Specifications                  5.0-1                        Amendment No. 1
Renewed  


Administrative Controls 5.0 5.0 ADMINISTRATIVE CONTROLS 5.2     Programs The following programs shall be established, implemented, and maintained.
Administrative Controls 5.0 TN-68 Technical Specifications Amendment No. 1 5.0-2 5.0 ADMINISTRATIVE CONTROLS 5.2 Programs The following programs shall be established, implemented, and maintained.
5.2.1 Cask Sliding Evaluation The TN-68 cask has been evaluated for sliding in the unlikely events of storm winds, missile impacts, flood forces and earthquakes. A static coefficient of 0.35 is used in these analyses. This program provides a means for evaluating the coefficient of friction to ensure that the cask will not slide during the seismic event.
5.2.1 Cask Sliding Evaluation The TN-68 cask has been evaluated for sliding in the unlikely events of storm winds, missile impacts, flood forces and earthquakes. A static coefficient of 0.35 is used in these analyses. This program provides a means for evaluating the coefficient of friction to ensure that the cask will not slide during the seismic event.
: a.     Pursuant to 10 CFR 72.212, this program shall evaluate the site-specific ISFSI pad configurations/conditions to ensure that the cask would not slide during the postulated design basis earthquake. The program shall conclude that the surface static friction coefficient of friction is greater than or equal to 0.35.
a.
: b.     Alternatively, for site-specific ISFSI pad configurations/conditions with a lower coefficient of friction than 0.35, the program shall evaluate the site specific conditions to ensure that the TN-68 cask will not slide during the postulated design basis earthquake. The program shall also evaluate storm winds, missile impacts and flood forces to ensure that the cask will not slide such that it could result in impact with other casks or structures at the ISFSI. The program shall ensure that these alternative analyses are documented and controlled.
Pursuant to 10 CFR 72.212, this program shall evaluate the site-specific ISFSI pad configurations/conditions to ensure that the cask would not slide during the postulated design basis earthquake. The program shall conclude that the surface static friction coefficient of friction is greater than or equal to 0.35.
b.
Alternatively, for site-specific ISFSI pad configurations/conditions with a lower coefficient of friction than 0.35, the program shall evaluate the site specific conditions to ensure that the TN-68 cask will not slide during the postulated design basis earthquake. The program shall also evaluate storm winds, missile impacts and flood forces to ensure that the cask will not slide such that it could result in impact with other casks or structures at the ISFSI. The program shall ensure that these alternative analyses are documented and controlled.
5.2.2 Cask Transport Evaluation Program This program provides a means for evaluating various transport configurations and transport route conditions to ensure that the design basis drop limits are met.
5.2.2 Cask Transport Evaluation Program This program provides a means for evaluating various transport configurations and transport route conditions to ensure that the design basis drop limits are met.
: a. Pursuant to 10 CFR 72.212, this program shall evaluate the site-specific transport conditions. The program shall evaluate the site-specific conditions to ensure that the end-drop loading does not exceed 60g. The program shall ensure that these analyses are documented and controlled.
: a. Pursuant to 10 CFR 72.212, this program shall evaluate the site-specific transport conditions. The program shall evaluate the site-specific conditions to ensure that the end-drop loading does not exceed 60g. The program shall ensure that these analyses are documented and controlled.
: b. This program shall establish administrative controls and procedures to ensure that cask TRANSPORT OPERATIONS are conducted within the limits imposed by the Technical Specifications or the alternative analysis described above.
: b. This program shall establish administrative controls and procedures to ensure that cask TRANSPORT OPERATIONS are conducted within the limits imposed by the Technical Specifications or the alternative analysis described above.
Renewed TN-68 Technical Specifications                  5.0-2                              Amendment No. 1
Renewed  


Administrative Controls 5.0 5.2.3 Cask Surface Dose Rate Evaluation Program This program provides a means to help ensure that ISFSIs using TN-68 casks do not violate the requirements of 10 CFR Part 72 and Part 20 regarding radiation doses and dose rates. The TN-68 design incorporates the use of an optional shield ring above the radial neutron shield. This shield ring may be installed to ensure that the dose rates meet the requirements identified below. The shield ring does not need to be installed on casks which have been surveyed and meet the dose rate limits identified in 5.2.3.2 and 5.2.3.3 without installation of the shield ring.
Administrative Controls 5.0 TN-68 Technical Specifications Amendment No. 1 5.0-3 5.2.3 Cask Surface Dose Rate Evaluation Program This program provides a means to help ensure that ISFSIs using TN-68 casks do not violate the requirements of 10 CFR Part 72 and Part 20 regarding radiation doses and dose rates. The TN-68 design incorporates the use of an optional shield ring above the radial neutron shield. This shield ring may be installed to ensure that the dose rates meet the requirements identified below. The shield ring does not need to be installed on casks which have been surveyed and meet the dose rate limits identified in 5.2.3.2 and 5.2.3.3 without installation of the shield ring.
: 1. As part of its evaluation pursuant to 10 CFR 72.212, the licensee shall perform an analysis to confirm that the limits of 10 CFR Part 20 and 10 CFR 72.104 will be satisfied under the actual site conditions and configurations considering the planned number of casks to be used and the planned fuel loading conditions.
: 1. As part of its evaluation pursuant to 10 CFR 72.212, the licensee shall perform an analysis to confirm that the limits of 10 CFR Part 20 and 10 CFR 72.104 will be satisfied under the actual site conditions and configurations considering the planned number of casks to be used and the planned fuel loading conditions.
: 2. On the basis of the analysis in TS 5.2.3.1, the licensee shall establish a set of cask surface dose rate limits which are to be applied to TN-68 casks used at the site.
: 2. On the basis of the analysis in TS 5.2.3.1, the licensee shall establish a set of cask surface dose rate limits which are to be applied to TN-68 casks used at the site.
Limits shall establish average gamma-ray and neutron dose rates for:
Limits shall establish average gamma-ray and neutron dose rates for:
: a. The top of the TN-68 cask (protective cover),
: a. The top of the TN-68 cask (protective cover),
: b. The sides of the radial neutron shield,
: b. The sides of the radial neutron shield, c.
: c. The side of the cask above the radial neutron shield, and
The side of the cask above the radial neutron shield, and
: d. The side of the cask below the radial neutron shield.
: d. The side of the cask below the radial neutron shield.
: 3. Notwithstanding the limits established in TS 5.2.3.2, the dose rate limits may not exceed the following values as calculated for a content of design basis fuel as follows:
: 3. Notwithstanding the limits established in TS 5.2.3.2, the dose rate limits may not exceed the following values as calculated for a content of design basis fuel as follows:
: a.     175 mr/hr gamma and 15 mr/hr neutron on the top (protective cover)
a.
: b.     125 mr/hr gamma and 30 mr/hr neutron on the sides of the radial neutron shield.
175 mr/hr gamma and 15 mr/hr neutron on the top (protective cover) b.
: c.     550 mr/hr gamma and 125 mr/hr neutron on the side surfaces of the cask above the radial neutron shield.
125 mr/hr gamma and 30 mr/hr neutron on the sides of the radial neutron shield.
: d.     400 mr/hr gamma and 300 mr/hr neutron on the side surfaces of the cask below the radial neutron shield.
c.
550 mr/hr gamma and 125 mr/hr neutron on the side surfaces of the cask above the radial neutron shield.
d.
400 mr/hr gamma and 300 mr/hr neutron on the side surfaces of the cask below the radial neutron shield.
: 4. Prior to transport of a TN-68 containing spent fuel to the ISFSI, the licensee shall measure the cask surface dose rates and calculate average values as described in TS 5.2.3.7 and 5.2.3.8.
: 4. Prior to transport of a TN-68 containing spent fuel to the ISFSI, the licensee shall measure the cask surface dose rates and calculate average values as described in TS 5.2.3.7 and 5.2.3.8.
The measured average dose rates shall be compared to the limits established in TS 5.2.3.2 or the limits in TS 5.2.3.3, whichever are lower.
The measured average dose rates shall be compared to the limits established in TS 5.2.3.2 or the limits in TS 5.2.3.3, whichever are lower.
When needed to meet this specification (TS 5.2.3), the optional external shield ring above the radial neutron shield is required to be in place.
When needed to meet this specification (TS 5.2.3), the optional external shield ring above the radial neutron shield is required to be in place.
Renewed TN-68 Technical Specifications                5.0-3                              Amendment No. 1
Renewed  


Administrative Controls 5.0
Administrative Controls 5.0 TN-68 Technical Specifications Amendment No. 1 5.0-4
: 5. If the measured average surface dose rates do not meet the limits of TS 5.2.3.2 or TS 5.2.3.3, whichever are lower, the licensee shall take the following actions:
: 5. If the measured average surface dose rates do not meet the limits of TS 5.2.3.2 or TS 5.2.3.3, whichever are lower, the licensee shall take the following actions:
: a.     Notify the U.S. Nuclear Regulatory Commission (Director of the Office of Nuclear Material Safety and Safeguards) within 30 days.
a.
: b.     Administratively verify that the correct fuel was loaded, and
Notify the U.S. Nuclear Regulatory Commission (Director of the Office of Nuclear Material Safety and Safeguards) within 30 days.
: c.     Perform an analysis to determine that placement of the as-loaded cask at the ISFSI will not cause the ISFSI to exceed the radiation exposure limits of 10 CFR Part 20 and 72.
b.
Administratively verify that the correct fuel was loaded, and c.
Perform an analysis to determine that placement of the as-loaded cask at the ISFSI will not cause the ISFSI to exceed the radiation exposure limits of 10 CFR Part 20 and 72.
: 6. If the analysis in 5.2.3.5.c shows that placement of the as-loaded cask at the ISFSI will cause the ISFSI to exceed the radiation exposure limits of 10 CFR Part 20 and 72, the licensee shall remove all fuel assemblies from the cask within 30 days of the time of cask loading.
: 6. If the analysis in 5.2.3.5.c shows that placement of the as-loaded cask at the ISFSI will cause the ISFSI to exceed the radiation exposure limits of 10 CFR Part 20 and 72, the licensee shall remove all fuel assemblies from the cask within 30 days of the time of cask loading.
: 7. Surface dose rates shall be measured approximately at the following points (see also Figure 5.2.3-1).
: 7. Surface dose rates shall be measured approximately at the following points (see also Figure 5.2.3-1).
: a.     Above the Radial Neutron Shield (A): Midway between the top of the cask body flange and the top of the radial neutron shield. At least six measurements equally spaced circumferentially.
a.
: b.     Sides of Radial Neutron Shield (B,C,D): one sixth, one half, and five sixths of the distance from the top of the radial neutron shield. At least six measurements equally spaced circumferentially at each elevation, two of which shall be at the circumferential location of the cask trunnions. However, no measurement shall be taken directly over the trunnion.
Above the Radial Neutron Shield (A): Midway between the top of the cask body flange and the top of the radial neutron shield. At least six measurements equally spaced circumferentially.
: c.     Below Radial Neutron Shield (E): Midway between the bottom of the radial neutron shield and the bottom of the cask. At least six measurements equally spaced circumferentially.
b.
: d.     Top of Cask (F, G, and H): At the center of the protective cover, one measurement (F). Halfway between the center and the knuckle at least four measurements equally spaced circumferentially (G). At the knuckle at least four measurements equally spaced circumferentially (H).
Sides of Radial Neutron Shield (B,C,D): one sixth, one half, and five sixths of the distance from the top of the radial neutron shield. At least six measurements equally spaced circumferentially at each elevation, two of which shall be at the circumferential location of the cask trunnions. However, no measurement shall be taken directly over the trunnion.
: 8.     The average dose rates shall be determined as follows.
c.
Below Radial Neutron Shield (E): Midway between the bottom of the radial neutron shield and the bottom of the cask. At least six measurements equally spaced circumferentially.
d.
Top of Cask (F, G, and H): At the center of the protective cover, one measurement (F). Halfway between the center and the knuckle at least four measurements equally spaced circumferentially (G). At the knuckle at least four measurements equally spaced circumferentially (H).
8.
The average dose rates shall be determined as follows.
In each of the four measurement zones in TS 5.2.3.7, the sum of the dose rate measurements is divided by the number of measurements to determine the average for that zone. The neutron and gamma-ray dose rates are averaged separately. Uniformly spaced dose rate measurement locations are chosen such that each point in a given zone represents approximately the same surface area.
In each of the four measurement zones in TS 5.2.3.7, the sum of the dose rate measurements is divided by the number of measurements to determine the average for that zone. The neutron and gamma-ray dose rates are averaged separately. Uniformly spaced dose rate measurement locations are chosen such that each point in a given zone represents approximately the same surface area.
Renewed TN-68 Technical Specifications                5.0-4                            Amendment No. 1
Renewed  


Administrative Controls 5.0 5.2.4 Aging Management Program Each general licensee shall have a program to establish, implement, and maintain written procedures for each aging management program (AMP) described in the updated final safety analysis report (UFSAR). The program shall include provisions for changing AMP elements, as necessary, and within the limitations of the approved licensing bases to address new information on aging effects based on inspection findings and/or industry operating experience provided to the general licensee during the renewal period. The program document shall contain a reference to the specific aspect of the AMP element implemented by that program document, and that reference shall be maintained even if the program document is modified.
Administrative Controls 5.0 Renewed TN-68 Technical Specifications 5.0-4a Amendment No. 1 5.2.4 Aging Management Program Each general licensee shall have a program to establish, implement, and maintain written procedures for each aging management program (AMP) described in the updated final safety analysis report (UFSAR). The program shall include provisions for changing AMP elements, as necessary, and within the limitations of the approved licensing bases to address new information on aging effects based on inspection findings and/or industry operating experience provided to the general licensee during the renewal period. The program document shall contain a reference to the specific aspect of the AMP element implemented by that program document, and that reference shall be maintained even if the program document is modified.
The general licensee shall establish and implement this program document prior to entering the period of extended operation or no later than one year after the effective date of the CoC renewal, whichever is later. The general licensee shall maintain the program document for as long as the general licensee continues to operate a TN-68 dry storage cask system in service for longer than 20 years.
The general licensee shall establish and implement this program document prior to entering the period of extended operation or no later than one year after the effective date of the CoC renewal, whichever is later. The general licensee shall maintain the program document for as long as the general licensee continues to operate a TN-68 dry storage cask system in service for longer than 20 years.  
Renewed TN-68 Technical Specifications                  5.0-4a                        Amendment No. 1


Administrative Controls 5.0 Renewed TN-68 Technical Specifications 5.0-5     Amendment No. 1}}
Administrative Controls 5.0 TN-68 Technical Specifications Amendment No. 1 5.0-5 Renewed}}

Latest revision as of 08:23, 29 November 2024

5. Proposed Renewed CoC 1027 Amd 1 Tech Specs
ML21174A131
Person / Time
Site: 07201027
Issue date: 09/20/2021
From:
Storage and Transportation Licensing Branch
To:
CJJacobs NMSS/DFM/STL 301.415.6825
Shared Package
ML21174A124 List:
References
Download: ML21174A131 (47)


Text

TN-68 GENERIC TECHNICAL SPECIFICATIONS AMENDMENT NO. 1 Renewed Amendment No. 1

Renewed TN-68 Technical Specifications i

Amendment No. 1 TABLE OF CONTENTS 1.0 USE AND APPLICATION........................................................................................ 1.1-1 1.1 Definitions.................................................................................................... 1.1-1 1.2 Logical Connectors....................................................................................... 1.2-1 1.3 Completion Times........................................................................................ 1.3-1 1.4 Frequency.................................................................................................... 1.4-1 2.0 FUNCTIONAL AND OPERATING LIMITS............................................................... 2.0-1 2.1 Functional and Operating Limits................................................................... 2.0-1 2.1.1 Fuel to be Stored in the TN-68 Cask............................................................ 2.0-1 2.2 Functional and Operating Limits Violations................................................... 2.0-2 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY......................... 3.0-1 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY........................................ 3.0-2 3.1 CASK INTEGRITY................................................................................................ 3.1.1-1 3.1.1 Cask Cavity Vacuum Drying...................................................................... 3.1.1-1 3.1.2 Cask Helium Backfill Pressure................................................................... 3.1.2-1 3.1.3 Cask Helium Leak Rate............................................................................. 3.1.3-1 3.1.4 Combined Helium Leak Rate..................................................................... 3.1.4-1 3.1.5 Cask Interseal Pressure............................................................................ 3.1.5-1 3.1.6 Cask Minimum Lifting Temperature........................................................... 3.1.6-1 3.2 CASK RADIATION PROTECTION........................................................................ 3.2.1-1 3.2.1 Cask Surface Contamination..................................................................... 3.2.1-1 4.0 DESIGN FEATURES............................................................................................... 4.0-1 4.1 STORAGE CASK..................................................................................................... 4.0-1 4.1.1 Criticality....................................................................................................... 4.0-1 4.1.2 Neutron Absorber Tests............................................................................... 4.0-1 4.1.3 Structural Performance................................................................................. 4.0-1 4.1.4 Codes and Standards................................................................................... 4.0-1 4.1.5 Helium Purity................................................................................................ 4.0-2 4.2 STORAGE PAD....................................................................................................... 4.0-2 4.2.1 Storage Locations for Casks......................................................................... 4.0-2 4.3 ISFSI SPECIFIC PARAMETERS AND ANALYSES................................................. 4.0-3 5.0 ADMINISTRATIVE CONTROLS.............................................................................. 5.0-1 5.1 TRAINING MODULE................................................................................................ 5.0-1 5.2 PROGRAMS............................................................................................................ 5.0-2 5.2.1 Cask Sliding Evaluation................................................................................ 5.0-2 5.2.2 Cask Transport Evaluation Program............................................................. 5.0-2 5.2.3 Cask Surface Dose Rate Evaluation Program.............................................. 5.0-3 5.2.4 Aging Management Program...................................................................... 5.0-4a

Definitions 1.1 TN-68 Technical Specifications Amendment No. 1 1.1-1 1.0 USE AND APPLICATION 1.1 Definitions


NOTE-----------------------------------------------------------------

The defined terms of this section appear in capitalized type and are applicable throughout these Technical Specifications and Bases.

Term Definition ACTIONS ACTIONS shall be that part of a Specification that prescribes Required Actions to be taken under designated Conditions within specified Completion Times.

CHANNEL OPERATIONAL A CHANNEL OPERATIONAL TEST (COT) shall be TEST (COT) the injection of a simulated or actual signal into the channel as close to the sensor as practicable to verify the operability of required alarm functions. The COT shall include adjustments, as necessary, of the alarm setpoint so that the setpoint is within the required range and accuracy.

HANDLED BY NORMAL MEANS HANDLED BY NORMAL MEANS refers to fuel assemblies/bundles that can be transferred within the spent fuel pool, cask pit and cask by the use of the normal station fuel handling equipment and procedures.

INTACT FUEL ASSEMBLY An INTACT FUEL ASSEMBLY is a spent nuclear fuel assembly without known or suspected cladding defects greater than pinhole leaks or hairline cracks and which can be HANDLED BY NORMAL MEANS. Partial fuel assemblies, that is spent fuel assemblies from which fuel rods are missing, shall not be classified as INTACT FUEL ASSEMBLIES unless dummy fuel rods are used to displace an amount of water equal to or greater than that displaced by the original fuel rod(s). Fuel with damage to spacer grids that renders the fuel outside its design and licensing basis for use in the reactor shall not be classified as an INTACT FUEL ASSEMBLY.

LOADING OPERATIONS LOADING OPERATIONS include all licensed activities on a cask while it is being loaded with fuel assemblies.

LOADING OPERATIONS begin when the first fuel assembly is placed in the cask and end when the cask is supported from the transporter.

STORAGE OPERATIONS STORAGE OPERATIONS include all licensed activities that are performed at the Independent Spent Fuel Storage Installation (ISFSI) while a cask containing spent fuel is sitting on a storage pad within the ISFSI.

(continued)

Renewed

Definitions 1.1 TN-68 Technical Specifications Amendment No. 1 1.1-2 1.1 Definitions (continued)

TRANSPORT OPERATIONS TRANSPORT OPERATIONS include all licensed activities performed on a cask loaded with one or more fuel assemblies when it is being moved to and from the ISFSI.

TRANSPORT OPERATIONS begin when the cask is first suspended from the transporter and end when the cask is at its destination and no longer supported from the transporter.

UNLOADING OPERATIONS UNLOADING OPERATIONS include al licensed activities on a cask while fuel assemblies are being unloaded.

UNLOADING OPERATIONS begin when the cask is no longer supported by the transporter and end when the last fuel assembly is removed from the cask.

Renewed

Logical Connectors 1.2 TN-68 Technical Specifications Amendment No. 1 1.2-1 1.0 USE AND APPLICATION 1.2 Logical Connectors PURPOSE The purpose of this section is to explain the meaning of logical connectors.

Logical connectors are used in Technical Specifications (TS) to discriminate between, and yet connect, discrete Conditions, Required Actions, Completion Times, Surveillances, and Frequencies. The only logical connectors that appear in TS are AND and OR. The physical arrangement of these connectors constitutes logical conventions with specific meanings.

BACKGROUND Several levels of logic may be used to state Required Actions. These levels are identified by the placement (or nesting) of the logical connectors and by the number assigned to each Required Action. The first level of logic is identified by the first digit of the number assigned to a Required Action and the placement of the logical connector in the first level of nesting (i.e., left justified with the number of the Required Action).

The successive levels of logic are identified by additional digits of the Required Action number and by successive indentions of the logical connectors.

When logical connectors are used to state a Condition, Completion Time, Surveillance, or Frequency, only the first level of logic is used, and the logical connector is left justified with the statement of the Condition, Completion Time, Surveillance, or Frequency.

EXAMPLES The following examples illustrate the use of logical connectors.

(continued)

Renewed

Logical Connectors 1.2 TN-68 Technical Specifications Amendment No. 1 1.2-2 1.2 Logical Connectors EXAMPLES EXAMPLE 1.2-1 (continued)

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. LCO not met.

A.1 Verify...

AND A.2 Restore...

In this example the logical connector AND is used to indicate that when in Condition A, both Required Actions A.1 and A.2 must be completed.

(continued)

Renewed

Logical Connectors 1.2 TN-68 Technical Specifications Amendment No. 1 1.2-3 1.2 Logical Connectors EXAMPLES EXAMPLE 1.2-2 (continued)

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. LCO not met.

A.1 Stop...

OR A.2.1 Verify...

AND A.2.2.1 Reduce...

OR A.2.2.2 Perform...

OR A.3 Remove...

This example represents a more complicated use of logical connectors.

Required Actions A.1, A.2, and A.3 are alternative choices, only one of which must be performed as indicated by the use of the logical connector OR and left justified placement. Any one of these three Actions may be chosen. If A.2 is chosen, then both A.2.1 and A.2.2 must be performed as indicated by the logical connector AND. Required Action A.2.2 is met by performing A.2.2.1 or A.2.2.2.

The indented position of the logical connector OR indicates that A.2.2.1 and A.2.2.2 are alternative choices, only one of which must be performed.

Renewed

Completion Times 1.3 TN-68 Technical Specifications Amendment No. 1 1.3-1 1.0 USE AND APPLICATION 1.3 Completion Times PURPOSE The purpose of this section is to establish the Completion Time convention and to provide guidance for its use.

BACKGROUND Limiting Conditions for Operation (LCOs) specify minimum requirements for ensuring safe operation of the cask. The ACTIONS associated with an LCO state Conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated Condition are Required Action(s) and Completion Times(s).

DESCRIPTION The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the time of discovery of a situation (e.g., equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the cask is in a specified condition stated in the Applicability of the LCO. Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and the Required Actions apply until the Condition no longer exists or the cask is not within the LCO Applicability.

Once a Condition has been entered, subsequent subsystems, components, or variables expressed in the Condition, discovered to be not within limits, will not result in separate entry into the Condition unless specifically stated. The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition.

(continued)

Renewed

Completion Times 1.3 TN-68 Technical Specifications Amendment No. 1 1.3-2 1.3 Completion Times (continued)

EXAMPLES The following examples illustrate the use of Completion Times with different types of Conditions and changing Conditions.

EXAMPLE 1.3-1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. Required Action and associated Completion Time not met.

B.1 Perform Action B.1.

AND B.2 Perform Action B.2.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours Condition B has two Required Actions. Each Required Action has its own separate Completion Time. Each Completion Time is referenced to the time that Condition B is entered.

The Required Actions of Condition B are to complete action B.1 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> AND to complete action B.2 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. A total of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is allowed for completing action B.1 and a total of 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (not 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />) is allowed for completing action B.2 from the time that Condition B was entered. If action B.1 is completed within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, the time allowed for completing action B.2 is the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> because the total time allowed for completing action B.2 is 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

(continued)

Renewed

Completion Times 1.3 TN-68 Technical Specifications Amendment No. 1 1.3-3 1.3 Completion Times EXAMPLES EXAMPLE 1.3-2 (continued)

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One system not within limit.

A.1 Restore system to within limit.

7 days B. Required Action and associated Completion Time not met.

B.1 Perform Action B.1.

AND B.2 Perform Action B.2.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours When a system is determined to not meet the LCO, Condition A is entered. If the system is not restored within 7 days, Condition B is also entered and the Completion Time clocks for Required Actions B.1 and B.2 start. If the system is restored after Condition B is entered, Condition A and B are exited, and therefore, the Required Actions of Condition B may be terminated.

(continued)

Renewed

Completion Times 1.3 TN-68 Technical Specifications Amendment No. 1 1.3-4 1.3 Completion Times EXAMPLES EXAMPLE 1.3-3 (continued)

ACTIONS


NOTE--------------------------------------------------------

Separate Condition entry is allowed for each component.

CONDITION REQUIRED ACTION COMPLETION TIME A. LCO not met.

A.1 Restore compliance with LCO.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B. Required Action and associated Completion Time not met.

B.1 Perform Action B.1.

AND B.2 Perform Action B.2.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours The Note above the ACTIONS Table is a method of modifying how the Completion Time is tracked. If this method of modifying how the Completion Time is tracked was applicable only to a specific Condition, the Note would appear in that Condition rather than at the top of the ACTIONS Table.

The Note allows Condition A to be entered separately for each component, and Completion Times tracked on a per component basis.

When a component is determined to not meet the LCO, Condition A is entered and its Completion Time starts. If subsequent components are determined to not meet the LCO, Condition A is entered for each component and separate Completion Times start and are tracked for each component.

(continued)

Renewed

Completion Times 1.3 TN-68 Technical Specifications Amendment No. 1 1.3-5 1.3 Completion Times (continued)

IMMEDIATE When "Immediately" is used as a Completion Time, the Required Action COMPLETION should be pursued without delay and in a controlled manner.

TIME Renewed

Frequency 1.4 TN-68 Technical Specifications Amendment No. 1 1.4-1 1.0 USE AND APPLICATION 1.4 Frequency PURPOSE The purpose of this section is to define the proper use and application of Frequency requirements.

DESCRIPTION Each Surveillance Requirement (SR) has a specified Frequency in which the Surveillance must be met in order to meet the associated Limiting Condition for Operation (LCO). An understanding of the correct application of the specified Frequency is necessary for compliance with the SR.

The "specified Frequency" is referred to throughout this section and each of the Specifications of Section 3.0, Surveillance Requirement (SR)

Applicability. The "specified Frequency" consists of the requirements of the Frequency column of each SR, as well as certain Notes in the Surveillance column that modify performance requirements.

Situations where a Surveillance could be required (i.e., its Frequency could expire), but where it is not possible or not desired that it be performed until sometime after the associated LCO is within its Applicability, represent potential SR 3.0.4 conflicts. To avoid these conflicts, the SR (i.e., the Surveillance or the Frequency) is stated such that it is only "required" when it can be and should be performed. With an SR satisfied, SR 3.0.4 imposes no restriction.

The use of "met" or "performed" in these instances conveys specific meanings. A Surveillance is "met" only when the acceptance criteria are satisfied. Known failure of the requirements of a Surveillance, even without a Surveillance specifically being "performed", constitutes a Surveillance not "met." "Performance" refers only to the requirement to specifically determine the ability to meet the acceptance criteria. SR 3.0.4 restrictions would not apply if both the following conditions are satisfied:

a.

The Surveillance is not required to be performed; and b.

The Surveillance is not required to be met or, even if required to be met, is not known to be failed.

(continued)

Renewed

Frequency 1.4 TN-68 Technical Specifications Amendment No. 1 1.4-2 1.4 Frequency (continued)

EXAMPLES The following examples illustrate the various ways that Frequencies are specified.

EXAMPLE 1.4-1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY Verify pressure within limit.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Example 1.4-1 contains the type of SR most often encountered in the Technical Specifications(TS). The Frequency specifies an interval (12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />) during which the associated Surveillance must be performed at least one time. Performance of the Surveillance initiates the subsequent interval. Although the Frequency is stated as 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, an extension of the time interval to 1.25 times the interval specified in the Frequency is allowed by SR 3.0.2 for operational flexibility. The measurement of this interval continues at all times, even when the SR is not required to be met per SR 3.0.1 (such as when the equipment is inoperable, a variable is outside specified limits, or the cask is outside the Applicability of the LCO). If the interval specified by SR 3.0.2 is exceeded while the cask is in a condition specified in the Applicability of the LCO, the LCO is not met in accordance with SR 3.0.1.

If the interval as specified by SR 3.0.2 is exceeded while the cask is not in a condition specified in the Applicability of the LCO for which performance of the SR is required, the Surveillance must be performed within the Frequency requirements of SR 3.0.2 prior to entry into the specified condition. Failure to do so would result in a violation of SR 3.0.4.

(continued)

Renewed

Frequency 1.4 TN-68 Technical Specifications Amendment No. 1 1.4-3 1.4 Frequency EXAMPLES EXAMPLE 1.4-2 (continued)

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY Verify flow is within limits.

Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to starting activity AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter Example 1.4-2 has two Frequencies. The first is a one time performance Frequency, and the second is of the type shown in Example 1.4-1. The logical connector "AND" indicates that both Frequency requirements must be met. Each time the example activity is to be performed, the Surveillance must be performed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to starting the activity.

The use of "once" indicates a single performance will satisfy the specified Frequency (assuming no other Frequencies are connected by "AND").

This type of Frequency does not qualify for the extension allowed by SR 3.0.2.

"Thereafter" indicates future performances must be established per SR 3.0.2, but only after a specified condition is first met (i.e., the "once" performance in this example). If the specified activity is canceled or not performed, the measurement of both intervals stops. New intervals start upon preparing to restart the specified activity.

Renewed

Functional and Operational Limits 2.0 TN-68 Technical Specifications Amendment No. 1 TN-68 Technical Specifications 2.0-1 2.0 FUNCTIONAL AND OPERATIONAL LIMITS 2.1 Functional and Operational Limits 2.1.1 Fuel to be Stored in the TN-68 Cask The spent nuclear fuel to be stored in the TN-68 cask shall meet the following requirements:

A.

Fuel shall be unconsolidated INTACT FUEL ASSEMBLIES except that up to 8 fuel assemblies with damage consisting of known or suspected cladding defects greater than pinholes or hairline cracks may be stored subject to the following limitations:

i.

they must be HANDLED BY NORMAL MEANS ii.

they must be stored in a basket configured for damaged fuel, in the designated compartments shown in Figure 2.1.1-1, with end caps installed top and bottom, iii.

there must be no missing fuel pins or fuel pin segments, unless dummy rods are used to displace an amount of water equal to or greater than that displaced by the original fuel rod(s), and iv.

assembly average burnup is limited to #45 GWd/MTU.

B.

Fuel shall be limited to fuel with Zircaloy cladding. Fuel having stainless steel replacement rods may be stored provided that a shielding analysis demonstrates that the dose rate contribution from such rods is bounded by the design basis fuel rods.

C.

Fuel shall be limited to the following fuel types or equivalents by other manufacturers with the following unirradiated specifications:

  1. of Max Min Max Fuel Rod Rod Uranium Assembly Type Designation Rods Pitch OD Content (MTU/assy)

GE 7x7 2,2A,2B 49 0.738 0.563 0.1977 GE 7x7 3,3A,3B 49 0.738 0.563 0.1923 GE 8x8 4,4A,4B 63 0.640 0.493 0.1880 GE 8x8 5,6,6B,7,7B 62 0.640 0.483 0.1876 GE 8x8 8,8B 62 0.640 0.483 0.1885 GE 8x8 8,8B,9,9B,10 60 0.640 0.463 0.1824 GE 9x9 11,13 74 0.566 0.440 0.1757 GE 10x10 12 92 0.510 0.404 0.1857 Fuel designs 6, 6B, 7 and 7B may also be designated as P, B or BP.

Fuel designs may be C, D or S lattice only.

D.

Fuel assemblies may be channeled or unchanneled. Channel thickness up to 0.120 inches thick are acceptable.

(continued)

Renewed

Functional and Operational Limits 2.0 TN-68 Technical Specifications 2.0-2 Amendment No. 1 2.1 Functional and Operational Limits (continued)

E.

7x7 fuel assemblies shall have the bounding characteristics specified in Table 2.1.1-1.

F.

8x8, 9x9, and 10x10 fuel assemblies shall be selected using the flow chart in Figure 2.1.1-2.

G.

All fuel assemblies shall have the following bounding characteristics:

i.

maximum initial enrichment per Table 2.1.1-2 ii.

The maximum weight per individual assembly shall be 705 pounds.

2.2 Functional and Operational Limits Violations If any Functional and Operational Limit of 2.1.1 is violated, the following actions shall be completed:

2.2.1 The affected fuel assemblies shall be removed from the cask and placed in a safe condition.

2.2.2 Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, notify the NRC Operations Center.

2.2.3 Within 30 days, a special report shall be submitted to the NRC which describes the cause of the violation and the actions taken to restore compliance and prevent recurrence.

Renewed

Functional and Operational Limits 2.0 TN-68 Technical Specifications 2.0-3 Amendment No. 1 Table 2.1.1-1 Minimum Acceptable Cooling Time as a Function of Max. Burnup and Min. Initial Enrichment for 7x7 Fuel 15 20 30 32 33 34 35 36 37 38 39 40 10 10 10 10 10 10 10 10 10 10 10 10 10 10 11 11 11 10 10 10 10 10 11 11 11 10 10 10 10 10 11 11 11 12 10 10 10 10 10 11 11 11 11 12 10 10 10 10 10 11 11 11 11 12 10 10 10 10 10 10 11 11 11 12 12 10 10 10 10 10 10 11 11 11 12 12 12 10 10 10 10 10 10 11 11 11 12 12 12 10 10 10 10 10 10 11 11 11 11 12 12 10 10 10 10 10 10 10 11 11 11 12 12 10 10 10 10 10 10 10 11 11 11 12 12 10 10 10 10 10 10 10 11 11 11 12 12 10 10 10 10 10 10 10 10 11 11 11 12 10 10 10 10 10 10 10 10 10 11 11 12 10 10 10 10 10 10 10 10 10 11 11 12 10 10 10 10 10 10 10 10 10 10 11 12 10 10 10 10 10 10 10 10 10 10 11 12 10 10 10 10 10 10 10 10 10 10 10 11 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10

- not evaluated Min.Init. Enrich. (1)

Maximum Burnup (GWd/MTU) (2)

(bundle ave %w)(3) 1.0 1.1 1.8 1.9 2.0 1.7 1.3 1.4 1.5 1.6 2.9 3.0 2.5 2.6 2.4 2.7 2.8 2.1 2.2 2.3 3.7 REQUIRED BWR COOLING TIMES (YEARS) 3.3 3.4 3.5 3.6 3.1 3.2 1.2

1. Round actual value down to next lower tenth.
2. Round actual value up to next higher GWd/MTU.
3. Average over entire bundle including uranium blankets.
4. A decay heat limit of 312 W/assembly is included in the table basis.

Renewed

Functional and Operational Limits 2.0 TN-68 Technical Specifications 2.0-4 Amendment No. 1 Table 2.1.1-2 Enrichment Limit as a Function of Basket Type Specified Minimum B10 Areal Density (mg B10/cm2) in Basket Intact Fuel Maximum Lattice Average Enrichment (wt % U235)

Damaged Fuel Maximum Pellet Enrichment (wt % U235)

Basket Designator Boral 75%

B10 credit Borated Aluminum and Metal Matrix Composites 90%

B10 credit 36 30 3.7 3.7 (none) 42 35 3.95 3.95 A

48 40 4.05 4.05 B

54 45 4.15 4.15 C

60 50 4.3 4.3 D

66 55 4.4 4.4 E

72 60 4.5 4.5 F

84 70 4.7 4.7 G

Notes:

1.

The basket designator is included in the unit serial number 2.

The maximum pellet enrichment is the enrichment of the most highly enriched rod in the most highly enriched lattice Renewed

Functional and Operational Limits 2.0 TN-68 Technical Specifications 2.0-5 Amendment No. 1 Figure 2.1.1-1 Location of Damaged Fuel Compartments Note:

Damaged fuel is to be stored only in a basket configured with damaged fuel compartment extensions at the locations marked with an X.

Renewed

Functional and Operational Limits 2.0 TN-68 Technical Specifications 2.0-6 Amendment No. 1 Figure 2.1.1-2 Flowchart for Selection of 8x8, 9x9, and 10x10 Fuel Notes:

1.

Decay heat per formula on following page, or any method that yields decay heat values equivalent or more conservative (i.e., higher) than those given by the formula.

2.

Burnup and enrichment are bundle average, including axial blankets.

(continued)

Renewed

Functional and Operational Limits 2.0 TN-68 Technical Specifications 2.0-7 Amendment No. 1 Figure 2.1.1-2, continued The Decay Heat (DH) in watts is expressed as:

DH = F1*Exp({[1-(6.0/X3)]*G}*[(X3-6.0)^H]*[(X2/X1)^I])

where F1 = A + B*X1 + C*X2 + D*X12 + E*X1*X2 + F*X22 and X1 =

Bundle Average Burnup in GWd/MTU X2 =

Initial Enrichment in wt % U235 X3 =

Cooling Time in Years A =

11.489825 B =

6.573922 C =

5.364592 D =

0.112665 E =

-1.248752 F =

4.262201 G =

-0.354672 H =

0.114847 I =

-0.188754 Renewed

LCO Applicability 3.0 TN-68 Technical Specifications Amendment No. 1 3.0-1 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during specified conditions in the Applicability, except as provided in LCO 3.0.2.

LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5.

If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.

LCO 3.0.3 Not applicable to a cask.

LCO 3.0.4 When an LCO is not met, entry into a specified condition in the Applicability shall not be made except when the associated ACTIONS to be entered permit continued operation in the specified condition in the Applicability for an unlimited period of time. This Specification shall not prevent changes in specified conditions in the Applicability that are required to comply with ACTIONS or that are related to the unloading of the cask.

Exceptions to this are stated in the individual Specifications. These exceptions allow entry into specified conditions in the Applicability when the associated ACTIONS to be entered allow operation in the specified condition in the Applicability only for a limited period of time.

LCO 3.0.5 Equipment removed from service or declared to not meet the LCO to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate it meets the LCO or that other equipment meets the LCO. This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate that the LCO is met.

LCO 3.0.6 Not applicable to a cask.

LCO 3.0.7 Not applicable to a cask.

Renewed

SR Applicability 3.0 TN-68 Technical Specifications Amendment No. 1 3.0-2 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 3.0.1 SRs shall be met during the specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3. Surveillances do not have to be performed on equipment or variables outside specified limits.

SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.

For Frequencies specified as "once", the above interval extension does not apply. If a Completion Time requires periodic performance on a "once per..." basis, the above Frequency extension applies to each performance after the initial performance.

Exceptions to this Specification are stated in the individual Specifications.

SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is less. This delay period is permitted to allow performance of the Surveillance.

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, And the applicable Condition(s) must be entered.

SR 3.0.4 Entry into a specified condition in the Applicability of an LCO shall not be made unless the LCO's Surveillances have been met within their specified Frequency. This provision shall not prevent entry into specified conditions in the Applicability that are required to comply with ACTIONS or that are related to the unloading of a cask.

Renewed

Cask Cavity Vacuum Drying 3.1.1 TN-68 Technical Specifications Amendment No. 1 3.1.1-1 3.1 CASK INTEGRITY 3.1.1 Cask Cavity Vacuum Drying LCO 3.1.1 The cask cavity vacuum drying pressure shall be sustained at or below 4 mbar absolute for a period of at least 30 minutes after isolation from the vacuum drying system.

APPLICABILITY:

During LOADING OPERATIONS ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME


NOTE-------

Not applicable until SR 3.1.1.1 is performed.

A.

Cask cavity vacuum drying pressure limit not met.


NOTE-----------

Action A.1 applies until helium is removed for subsequent operations.

A.1 Achieve or maintain a nominal helium environment in the cask.

AND A.2 Establish cask cavity drying pressure within limits.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Prior to helium backfill (SR 3.1.2.1)

B.

Required Action A.1 and associated Completion Time not met.

B.1 Return cask to pool and reflood.

7 days C. Required Action A.2 and associated Completion Time not met.

C.1 Return cask to pool and reflood.

30 days Renewed

Cask Cavity Vacuum Drying 3.1.1 TN-68 Technical Specifications Amendment No. 1 3.1.1-2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.1.1 Verify that the equilibrium cask cavity vacuum drying pressure is brought to # 4 mbar absolute for $ 30 minutes

< 22 kW:

Once, prior to helium backfill (SR 3.1.2.1)

> 22 kW:

Once, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of completion of cask draining.

or Once, prior to helium backfill (SR 3.1.2.1), if cask is evacuated to

< 50 mbar and backfilled with helium anytime prior to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from draining.

Renewed

Cask Helium Backfill Pressure 3.1.2 TN-68 Technical Specifications Amendment No. 1 3.1.2-1 3.1 CASK INTEGRITY 3.1.2 Cask Helium Backfill Pressure LCO 3.1.2 The cask cavity shall be filled with helium to a pressure of 2.0 atm absolute (+0/-10%).

APPLICABILITY:

During LOADING OPERATIONS.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME


NOTE-------

Not applicable until SR 3.1.2.1 is performed.

A.

Cask initial helium backfill pressure limit not met.


NOTE-----------

Action A.1 applies until helium is removed for subsequent operations A.1 Achieve or maintain a nominal helium environment in the cask AND A.2 Establish cask cavity backfill pressure within limits.

Immediately Prior to leak testing (SR 3.1.3.1)

B.

Required Action A.1 and Associated Completion Time not met.

B.1 Return cask to pool and reflood.

7 days C.

Required Action A.2 and associated Completion Time not met.

C.1 Return cask to pool and reflood.

30 days Renewed

Cask Helium Backfill Pressure 3.1.2 TN-68 Technical Specifications Amendment No. 1 3.1.2-2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.2.1 Verify that the cask cavity helium pressure is 2.0 atm absolute (+0/-10%).

< 22 kW:

Once, prior to leak testing (SR 3.1.3.1)

> 22 kW:

Once, within 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> of completion of cask draining.

or Once, prior to leak testing (SR 3.1.3.1) if the cask is backfilled with helium after vacuum drying (SR 3.1.1.1).

Renewed

Cask Helium Leak Rate 3.1.3 TN-68 Technical Specifications Amendment No. 1 3.1.3-1 3.1 CASK INTEGRITY 3.1.3 Cask Helium Leak Rate LCO 3.1.3 The combined helium leak rate for all closure seals shall not exceed 1.0 E-5 ref-cc/sec.

APPLICABILITY:

During LOADING OPERATIONS.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME


NOTE-------

Not applicable until SR 3.1.3.1 is performed.

A.

Cask helium leak rate not met.

A.1 Establish cask helium leak rate within limit.

7 days B.

Required Action A.1 and Associated Completion Time not met.

B.1 Return cask to pool and reflood.

30 days SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.3.1 Verify cask helium leak rate is within limit.

Once, prior to TRANSPORT OPERATIONS.

Renewed

Combined Helium Leak Rate 3.1.4 TN-68 Technical Specifications Amendment No. 1 3.1.4-1 3.1 CASK INTEGRITY 3.1.4 Combined Helium Leak Rate LCO 3.1.4 The combined helium leak rate for all closure seals and the overpressure system shall not exceed 1.0 E-5 ref-cc/sec.

APPLICABILITY:

During STORAGE OPERATIONS.

ACTIONS


NOTE-------------------------------------------------------------------------------------------

Separate Condition entry is allowed for each cask.

CONDITION REQUIRED ACTION COMPLETION TIME


NOTE-------

Not applicable until SR 3.1.4.1 is performed.

A.

Combined helium leak rate not met.

A.1 Establish combined helium leak rate within limit.

48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> B.

Required Action A.1 and Associated Completion Time not met.

B.1 Return cask to spent fuel unloading facility 30 days Renewed

Combined Helium Leak Rate 3.1.4 TN-68 Technical Specifications Amendment No. 1 3.1.4-2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY


NOTE---------------------------------------------------------------

This surveillance may be combined with SR 3.1.3.1.

SR 3.1.4.1 Verify the combined helium leak rate is within the limit.

Once, prior to TRANSPORT OPERATIONS OR Once within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of commencing STORAGE OPERATIONS.

Renewed

Cask Interseal Pressure 3.1.5 TN-68 Technical Specifications Amendment No. 1 3.1.5-1 3.1 CASK INTEGRITY 3.1.5 Cask Interseal Pressure LCO 3.1.5 Cask interseal pressure shall be maintained at a pressure of at least 3.0 atm absolute.

APPLICABILITY:

During STORAGE OPERATIONS.

ACTIONS


NOTE-----------------------------------------------------------------------------------------

Separate Condition entry is allowed for each cask.

CONDITION REQUIRED ACTION COMPLETION TIME A.

Cask interseal pressure below limit.

A.1 Restore cask interseal pressure above limit.

7 days B.

Required Action A.1 and Associated Completion Time not met.

B.1 Return cask to spent fuel unloading facility 30 days SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.5.1 Verify cask interseal helium pressure above limit.

7 days SR 3.1.5.2 Perform a CHANNEL OPERATIONAL TEST (COT) to verify proper functioning of pressure switch/transducer on cask overpressure system.

Once, within 7 days of commencing STORAGE OPERATIONS and every 36 months Renewed

Cask Minimum Lifting Temperature 3.1.6 TN-68 Technical Specifications Amendment No. 1 3.1.6-1 3.1 CASK INTEGRITY 3.1.6 Cask Minimum Lifting Temperature LCO 3.1.6 The loaded cask shall not be lifted if the outer surface of the cask is below -20EF.

APPLICABILITY:

During TRANSPORT OPERATIONS.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Cask surface temperature below limit.

A.1 Lower cask to safe position.

Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY NOTE: This surveillance does not need to be performed if temperature is known to be above freezing.

SR 3.1.6.1 Verify outer surface temperature is above limit.

Once, immediately prior to lifting cask and prior to cask transfer to or from ISFSI Renewed

Cask Surface Contamination 3.2.1 TN-68 Technical Specifications Amendment No. 1 3.2.1-1 3.2 CASK RADIATION PROTECTION 3.2.1 Cask Surface Contamination LCO 3.2.1 Removable contamination on the cask exterior surfaces shall not exceed:

a.

1000 dpm/100 cm2 (0.2 Bq/cm2) from beta and gamma sources; and b.

20 dpm/100 cm2 (0.003 Bq/cm2) from alpha sources.

APPLICABILITY:

During LOADING OPERATIONS.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME


NOTE-------

Not applicable until SR 3.2.1.1 is performed.

A.

Removable contamination on the cask exterior surface exceeds either limit.

A.1 Decontaminate cask surfaces to below required levels.

Prior to TRANSPORT OPERATIONS.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.1.1 Verify that the removable contamination on the exterior surface of the cask does not exceed the specified limits.

Once, prior to TRANSPORT OPERATIONS Renewed

Design Features 4.0 TN-68 Technical Specifications Amendment No. 1 3.0-1 4.0 DESIGN FEATURES The Specifications in this section include the design characteristics of special importance to each of the physical barriers and to maintenance of safety margins in the cask design. The principle objective of this category is to describe the design envelope that constrains any physical changes to essential equipment. Included in this category are the site environmental parameters which provide the bases for design, but are not inherently suited for description as LCOs.

4.1 Storage Cask 4.1.1 Criticality The design of the storage cask, including spatial constraints on adjacent assemblies (minimum basket opening of 5.97 inches by 5.97 inches) and boron content of the basket material (minimum areal density per Table 2.1.1-2) shall ensure that fuel assemblies are maintained in a subcritical condition with a keff of less than 0.95 under all conditions of operation.

Neutron Absorber Tests Boron Aluminum Alloy (Borated Aluminum), Boron Carbide/Aluminum Metal Matrix Composites (MMCs) or Boral shall be supplied in accordance with FSAR sections 9.1.7.1, 9.1.7.2, 9.1.7.3, 9.4.2, 9.4.3.5, and 9.4.4.3. These sections of the FSAR are hereby incorporated into the TN-68 CoC.

4.1.2 Structural Performance The cask has been evaluated for a cask tipover (equivalent to a side drop of 65 g's) and a bottom end drop resulting in an axial gravitational (g) loading of 60 g's.

4.1.3 Codes and Standards The American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section III, 1995 Edition with Addenda through 1996, is the governing Code for the TN-68 Cask, except that the material properties from later editions of Section II Part D may be used for design.

The TN-68 cask confinement boundary is designed, fabricated and inspected in accordance with Subsection NB of the ASME Code to the maximum practical extent. Alternatives to the code are listed in Table 4.1-1.

The TN-68 basket is designed, fabricated and inspected in accordance with Subsection NG of the ASME Code to the maximum practical extent.

Alternatives to the code are listed in Table 4.1-1.

The ASME code requirements apply only to important to safety items.

Renewed 4.0-1

Design Features 4.0 TN-68 Technical Specifications Amendment No. 1 4.0-2 Proposed alternatives to ASME Code Section III, 1995 Edition with Addenda through 1996 including alternatives allowed by Table 4.1-1 may be used when authorized by the Director of the Office of Nuclear Material Safety and Safeguards or Designee. The applicant should demonstrate that:

1.

The proposed alternatives would provide an acceptable level of quality and safety, or 2.

Compliance with the specified requirements of ASME Code Section III, 1995 Edition with Addenda through 1996, would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.

Requests for alternatives in accordance with this section should be submitted in accordance with 10 CFR 72.4.

4.1.4 Helium Purity The cask shall be filled with helium with a purity of at least 99.99%. This level of purity will ensure that the residual impurities in the cask cavity will be less than 1 mole.

4.2 Storage Pad 4.2.1 Storage Locations for Casks Casks shall be spaced a minimum of 14 feet apart, center to center. This minimum spacing will ensure the proper dissipation of radiant heat energy from an array of casks as assumed in the TN-68 Safety Analysis Report.

The casks may be spaced more closely if the Certificate Holder or Licensee performs a thermal analysis, in accordance with the methodology described in Section 4.10.1.2 of the SAR, to demonstrate that the cask surface temperature will not exceed 255EF under the site specific ambient temperatures and the cask contents decay heat; but in no case casks can be spaced closer than 12 feet on center.

Renewed

Design Features 4.0 TN-68 Technical Specifications Amendment No. 1 4.0-3 4.3 ISFSI Specific Parameters and Analyses ISFSI specific parameters and analyses that shall need verification by the system user are, as a minimum, as follows:

1.

Tornado maximum wind speeds:

360 mph 2.

Flood levels up to 57 feet and drag forces up to 45,290 lbs.

3.

Seismic loads on the ISFSI pad of up to 0.26g horizontal and 0.17g vertical.

4.

Average daily ambient temperatures:

$ -20EF minimum; #100EF maximum 5.

The potential for fires and explosions shall be addressed, based on site-specific considerations. Fires and explosions should be bounded by the cask design bases parameters of 200 gallons of fuel (in the tank of the transporter vehicle) and an external pressure of 25 psig.

6.

Supplemental Shielding: In cases where engineered features (i.e. berms, shield walls) are used to ensure that the requirements of 10 CFR 72.104(a) are met, such features are to be considered Important to Safety and must be evaluated to determine the applicable Quality Assurance Category.

Renewed

Design Features 4.0 TN-68 Technical Specifications Amendment No. 1 4.0-4 Table 4.1-1 TN-68 ASME Code Alternatives The cask confinement boundary is designed, fabricated and inspected in accordance with the ASME Code Subsection NB to the maximum practical extent. The basket is designed, fabricated and inspected in accordance with ASME Code Subsection NG to the maximum practical extent. The gamma shielding, which is primarily for shielding, but also provides structural support to the confinement boundary during accident events, was designed in accordance with Subsection NF of the code. Inspections of the gamma shielding are performed in accordance with ASME code Subsection NF as detailed in the SAR. Other cask components, such as the protective cover, outer shell and neutron shielding are not governed by the ASME Code.

Component Reference ASME Code/Section Code Requirement Alternative, Justification & Compensatory Measures TN-68 Cask and Basket NB/NG -1100/

Subsection NCA NB/NG - 2000 Stamping and preparation of reports by the Certificate Holder, Surveillances, Use of ASME Certificate Holders The TN-68 cask is not N stamped, nor is there a code design specification or stress report generated. A design criteria document is generated in accordance with TNs QA Program and the design and analysis is performed under TNs QA Program and presented in the SAR. The cask may also be fabricated by other than N-stamp holders and materials may be supplied by other than ASME Certificate holders. Surveillances are performed by TN and utility personnel rather than by an Authorized Nuclear Inspector (ANI)

TN-68 Cask and Basket NCA-3800 QA Requirements The quality assurance requirements of NQA-1 or 10 CFR 72 Subpart G are imposed in lieu of NCA-3800 requirements.

Lid Bolts NB-3232.3 Fatigue analysis of bolts A fatigue analysis of the bolts is not performed for storage, since the bolts are not subject to significant cyclical loads.

Renewed

Design Features 4.0 Table 4.1-1 TN-68 ASME Code Alternatives TN-68 Technical Specifications Amendment No. 1 4.0-5 Component Reference ASME Code/Section Code Requirement Alternative, Justification & Compensatory Measures Confinement Vessel NB-6200 Hydrostatic Testing The confinement vessel is hydrostatically tested in accordance with the requirements of the ASME B&PV Code,Section III, Article NB-6200 with the exception that the confinement vessel is installed in the gamma shield shell during testing. The confinement vessel is supported by the gamma shield during all design and accident events.

Weld of bottom inner plate to the confinement shell NB-5231 Full penetration corner welded joints require the fusion zone and the parent metal beneath the attachment surface to be UT after welding.

The required UT inspection will be performed on a best efforts basis. The joint will be examined by RT and either PT or MT methods in accordance with ASME Subsection NB requirements. The joint may be welded after the confinement shell is shrink fitted into the gamma shield shell. The geometry of the joint may not allow for UT inspection.

Confinement Shell Rolling Qualification NB-4213 The rolling process used to form the inner vessel should be qualified to determine that the required impact properties of NB-2300 are met after straining by taking test specimens from three different heats.

If the plates are made from less than three heats, each heat will be tested to verify the impact properties.

Confinement Vessel NB-7000 Vessels are required to have overpressure protection No overpressure protection is provided. Function of confinement vessel is to contain radioactive contents under normal, off-normal and accident conditions of storage. Confinement vessel is designed to withstand maximum internal pressure considering 100% fuel rod failure and maximum accident temperatures.

Renewed

Design Features 4.0 Table 4.1-1 TN-68 ASME Code Alternatives TN-68 Technical Specifications Amendment No. 1 4.0-6 Component Reference ASME Code/Section Code Requirement Alternative, Justification & Compensatory Measures Confinement Vessel and Basket NB/NG-8000 Requirements for nameplates, stamping and reports per NCA-8000 TN-68 cask is to be marked and identified in accordance with 10 CFR72 requirements. Code stamping is not required. QA data package to be in accordance with Transnuclear approved QA program.

Confinement Vessel NB-1131 The design specification shall define the boundary of a component to which other component is attached.

A code design specification was not prepared for the TN-68 cask. A TN design criteria was prepared in accordance with TNs QA program. The confinement boundary is specified in Chapter 1 of the SAR.

Basket poison and aluminum plates NG-2000 Use of ASME Materials The poison material and the aluminum plates are not used for structural analysis, but to provide criticality control and heat transfer. They are not code materials.

Basket Rails NG-2000 Use of ASME Materials The fuel basket rail material is not a Class 1 material. It was selected for its properties. Aluminum has excellent thermal conductivity and a high strength to weight ratio.

NUREG-3854 and 1617 allow materials other than ASME Code materials to be used in the cask fabrication.

ASME Code does provide the material properties for the aluminum alloy up to 400°F and also allows the material to be used for Section III applications (Class 2 and 3).

The construction of the aluminum rails will meet the requirements of Section III, Subsection NG.

Renewed

Design Features 4.0 Table 4.1-1 TN-68 ASME Code Alternatives TN-68 Technical Specifications Amendment No. 1 4.0-7 Component Reference ASME Code/Section Code Requirement Alternative, Justification & Compensatory Measures Basket Compartment longitudinal weld joint NG-5231 Table NG-3352-1 specifies that in order to utilize a quality factor of 0.9 for a full penetration weld, examination must be in accordance with NG-5231. NG-5231 specifies that either a liquid penetrant or magnetic particle examination be performed of the root, each subsequent layer, and on the external weld surfaces and adjacent base material for 1/2" on each side of the weld.

If these welds are made in a single pass, the requirement of NG-5231 is satisfied by surface examination on the outside of the compartment, and the inside for one diameters length from each end.

Automated autogenous PAW welds followed by autogenous GTAW in the same pass through the welding equipment may be regarded as a single pass in accordance with Code Case N-642.

This is a clarification, not an alternative.

Basket Fusion (Spot)

Welds NG-3352 NG-4330 NG-3352 specifies permissible types of welded joints and their examination NG-4330 requires weld qualification in accordance with ASME Section IX The fusion (spot) welds are not included in the permissible weld types listed in NG-3352.

The welds near the end of each tube are examined by direct visual inspection to the acceptance criteria of NG-5360; the remaining welds are examined by remote visual inspection using auxiliary lighting, mirrors, boroscopes, or other remote visual instruments.

ASME Section IX does not provide qualification tests for this type of weld. The weld is qualified following Section IX to the degree applicable, supplemented by mechanical testing as specified on drawing 972-70-5, note 1.

Renewed

Administrative Controls 5.0 TN-68 Technical Specifications Amendment No. 1 5.0-1 5.0 ADMINISTRATIVE CONTROLS 5.1 Training Module Training modules shall be developed under the general licensees training program as required by 10 CFR 72.212(b)(6). Training modules shall require a comprehensive program for the operation and maintenance of the TN-68 spent fuel storage cask and the independent spent fuel storage installation (ISFSI). The training modules shall include the following elements, at a minimum:

TN-68 cask design (overview)

ISFSI Facility design (overview)

Systems, Structures, and Components Important to Safety (overview)

TN-68 Dry Storage Cask Safety Analysis Report (overview)

NRC Safety Evaluation Report (overview)

Certificate of Compliance conditions TN-68 Technical Specifications Applicable Regulatory Requirements (e.g.,10 CFR72, Subpart K, 10CFR 20, 10 CFR Part 73)

Required Instrumentation and Use Operating Experience Reviews TN-68 Cask Operating and Maintenance procedures, including:

Fuel qualification and loading Rigging and handling Loading Operations as described in Chapter 8 of the SAR Unloading Operations including reflooding as described in Chapter 8 of the SAR Auxiliary equipment operations and maintenance (i.e. vacuum drying, helium backfilling and leak testing, reflooding)

Transfer operations including loading and unloading of the Transport Vehicle ISFSI Surveillance operations Radiation Protection Maintenance Security Off-normal and accident conditions, responses and corrective actions.

Renewed

Administrative Controls 5.0 TN-68 Technical Specifications Amendment No. 1 5.0-2 5.0 ADMINISTRATIVE CONTROLS 5.2 Programs The following programs shall be established, implemented, and maintained.

5.2.1 Cask Sliding Evaluation The TN-68 cask has been evaluated for sliding in the unlikely events of storm winds, missile impacts, flood forces and earthquakes. A static coefficient of 0.35 is used in these analyses. This program provides a means for evaluating the coefficient of friction to ensure that the cask will not slide during the seismic event.

a.

Pursuant to 10 CFR 72.212, this program shall evaluate the site-specific ISFSI pad configurations/conditions to ensure that the cask would not slide during the postulated design basis earthquake. The program shall conclude that the surface static friction coefficient of friction is greater than or equal to 0.35.

b.

Alternatively, for site-specific ISFSI pad configurations/conditions with a lower coefficient of friction than 0.35, the program shall evaluate the site specific conditions to ensure that the TN-68 cask will not slide during the postulated design basis earthquake. The program shall also evaluate storm winds, missile impacts and flood forces to ensure that the cask will not slide such that it could result in impact with other casks or structures at the ISFSI. The program shall ensure that these alternative analyses are documented and controlled.

5.2.2 Cask Transport Evaluation Program This program provides a means for evaluating various transport configurations and transport route conditions to ensure that the design basis drop limits are met.

a. Pursuant to 10 CFR 72.212, this program shall evaluate the site-specific transport conditions. The program shall evaluate the site-specific conditions to ensure that the end-drop loading does not exceed 60g. The program shall ensure that these analyses are documented and controlled.
b. This program shall establish administrative controls and procedures to ensure that cask TRANSPORT OPERATIONS are conducted within the limits imposed by the Technical Specifications or the alternative analysis described above.

Renewed

Administrative Controls 5.0 TN-68 Technical Specifications Amendment No. 1 5.0-3 5.2.3 Cask Surface Dose Rate Evaluation Program This program provides a means to help ensure that ISFSIs using TN-68 casks do not violate the requirements of 10 CFR Part 72 and Part 20 regarding radiation doses and dose rates. The TN-68 design incorporates the use of an optional shield ring above the radial neutron shield. This shield ring may be installed to ensure that the dose rates meet the requirements identified below. The shield ring does not need to be installed on casks which have been surveyed and meet the dose rate limits identified in 5.2.3.2 and 5.2.3.3 without installation of the shield ring.

1. As part of its evaluation pursuant to 10 CFR 72.212, the licensee shall perform an analysis to confirm that the limits of 10 CFR Part 20 and 10 CFR 72.104 will be satisfied under the actual site conditions and configurations considering the planned number of casks to be used and the planned fuel loading conditions.
2. On the basis of the analysis in TS 5.2.3.1, the licensee shall establish a set of cask surface dose rate limits which are to be applied to TN-68 casks used at the site.

Limits shall establish average gamma-ray and neutron dose rates for:

a. The top of the TN-68 cask (protective cover),
b. The sides of the radial neutron shield, c.

The side of the cask above the radial neutron shield, and

d. The side of the cask below the radial neutron shield.
3. Notwithstanding the limits established in TS 5.2.3.2, the dose rate limits may not exceed the following values as calculated for a content of design basis fuel as follows:

a.

175 mr/hr gamma and 15 mr/hr neutron on the top (protective cover) b.

125 mr/hr gamma and 30 mr/hr neutron on the sides of the radial neutron shield.

c.

550 mr/hr gamma and 125 mr/hr neutron on the side surfaces of the cask above the radial neutron shield.

d.

400 mr/hr gamma and 300 mr/hr neutron on the side surfaces of the cask below the radial neutron shield.

4. Prior to transport of a TN-68 containing spent fuel to the ISFSI, the licensee shall measure the cask surface dose rates and calculate average values as described in TS 5.2.3.7 and 5.2.3.8.

The measured average dose rates shall be compared to the limits established in TS 5.2.3.2 or the limits in TS 5.2.3.3, whichever are lower.

When needed to meet this specification (TS 5.2.3), the optional external shield ring above the radial neutron shield is required to be in place.

Renewed

Administrative Controls 5.0 TN-68 Technical Specifications Amendment No. 1 5.0-4

5. If the measured average surface dose rates do not meet the limits of TS 5.2.3.2 or TS 5.2.3.3, whichever are lower, the licensee shall take the following actions:

a.

Notify the U.S. Nuclear Regulatory Commission (Director of the Office of Nuclear Material Safety and Safeguards) within 30 days.

b.

Administratively verify that the correct fuel was loaded, and c.

Perform an analysis to determine that placement of the as-loaded cask at the ISFSI will not cause the ISFSI to exceed the radiation exposure limits of 10 CFR Part 20 and 72.

6. If the analysis in 5.2.3.5.c shows that placement of the as-loaded cask at the ISFSI will cause the ISFSI to exceed the radiation exposure limits of 10 CFR Part 20 and 72, the licensee shall remove all fuel assemblies from the cask within 30 days of the time of cask loading.
7. Surface dose rates shall be measured approximately at the following points (see also Figure 5.2.3-1).

a.

Above the Radial Neutron Shield (A): Midway between the top of the cask body flange and the top of the radial neutron shield. At least six measurements equally spaced circumferentially.

b.

Sides of Radial Neutron Shield (B,C,D): one sixth, one half, and five sixths of the distance from the top of the radial neutron shield. At least six measurements equally spaced circumferentially at each elevation, two of which shall be at the circumferential location of the cask trunnions. However, no measurement shall be taken directly over the trunnion.

c.

Below Radial Neutron Shield (E): Midway between the bottom of the radial neutron shield and the bottom of the cask. At least six measurements equally spaced circumferentially.

d.

Top of Cask (F, G, and H): At the center of the protective cover, one measurement (F). Halfway between the center and the knuckle at least four measurements equally spaced circumferentially (G). At the knuckle at least four measurements equally spaced circumferentially (H).

8.

The average dose rates shall be determined as follows.

In each of the four measurement zones in TS 5.2.3.7, the sum of the dose rate measurements is divided by the number of measurements to determine the average for that zone. The neutron and gamma-ray dose rates are averaged separately. Uniformly spaced dose rate measurement locations are chosen such that each point in a given zone represents approximately the same surface area.

Renewed

Administrative Controls 5.0 Renewed TN-68 Technical Specifications 5.0-4a Amendment No. 1 5.2.4 Aging Management Program Each general licensee shall have a program to establish, implement, and maintain written procedures for each aging management program (AMP) described in the updated final safety analysis report (UFSAR). The program shall include provisions for changing AMP elements, as necessary, and within the limitations of the approved licensing bases to address new information on aging effects based on inspection findings and/or industry operating experience provided to the general licensee during the renewal period. The program document shall contain a reference to the specific aspect of the AMP element implemented by that program document, and that reference shall be maintained even if the program document is modified.

The general licensee shall establish and implement this program document prior to entering the period of extended operation or no later than one year after the effective date of the CoC renewal, whichever is later. The general licensee shall maintain the program document for as long as the general licensee continues to operate a TN-68 dry storage cask system in service for longer than 20 years.

Administrative Controls 5.0 TN-68 Technical Specifications Amendment No. 1 5.0-5 Renewed