{{#Wiki_filter:June 19, 2020
{{#Wiki_filter:June 19, 2020  
Mr. Daniel G. Stoddard
Senior Vice President and
Mr. Daniel G. Stoddard  
  Chief Nuclear Officer
Senior Vice President and
Innsbrook Technical Center
    Chief Nuclear Officer  
5000 Dominion Blvd.
Innsbrook Technical Center  
Glen Allen, VA 23060-6711
5000 Dominion Blvd.  
SUBJECT: NOTIFICATION OF SURRY POWER STATION DESIGN BASES ASSURANCE
Glen Allen, VA 23060-6711  
              INSPECTION - U.S. NUCLEAR REGULATORY COMMISSION INSPECTION
              REPORT 05000280/2020010 AND 05000281/2020010
SUBJECT: NOTIFICATION OF SURRY POWER STATION DESIGN BASES ASSURANCE  
Dear Mr. Stoddard:
INSPECTION - U.S. NUCLEAR REGULATORY COMMISSION INSPECTION  
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
REPORT 05000280/2020010 AND 05000281/2020010  
Region II staff will conduct a Design Bases Assurance Inspection (DBAI) at your Surry Power
Station during the weeks of September 14-18, 2020, and September 28-October 2, 2020.
Dear Mr. Stoddard:  
Mr. Theo Fanelli, a Senior Reactor Inspector from the NRCs Region II office, will lead the
inspection team. The inspection will be conducted in accordance with Inspection Procedure
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)  
71111.21M, Design Bases Assurance Inspection (Teams), dated December 8, 2016 (ADAMS
Region II staff will conduct a Design Bases Assurance Inspection (DBAI) at your Surry Power  
ML16238A320).
Station during the weeks of September 14-18, 2020, and September 28-October 2, 2020.  
Mr. Theo Fanelli, a Senior Reactor Inspector from the NRCs Region II office, will lead the  
inspection team. The inspection will be conducted in accordance with Inspection Procedure  
71111.21M, Design Bases Assurance Inspection (Teams), dated December 8, 2016 (ADAMS  
ML16238A320).  
The inspection will evaluate the capability of components that have been modified and risk-
The inspection will evaluate the capability of components that have been modified and risk-
significant/low-margin components to function as designed and to support proper system
significant/low-margin components to function as designed and to support proper system  
operation. The inspection will also include a review of selected operator actions, operating
operation. The inspection will also include a review of selected operator actions, operating  
experience, and modifications.
experience, and modifications.  
During a telephone conversation on June 15, 2020, with Mr. Steve Newman, we confirmed
arrangements for an information-gathering site visit and the two-week onsite inspection. The
During a telephone conversation on June 15, 2020, with Mr. Steve Newman, we confirmed  
schedule is as follows:
arrangements for an information-gathering site visit and the two-week onsite inspection. The  
    *   Information-gathering visit: Week of August 24, 2020
schedule is as follows:  
    *   Onsite weeks: Weeks of September 14 and September 28, 2020
The purpose of the information-gathering visit is to meet with members of your staff to identify
*  
components that have been modified, risk-significant components and operator actions.
Information-gathering visit: Week of August 24, 2020  
Information and documentation needed to support the inspection will also be identified.
*  
Mr. Andy Rosebrook, a Region II Senior Risk Analyst, will support Mr. Fanelli during the
Onsite weeks: Weeks of September 14 and September 28, 2020  
information-gathering visit to review probabilistic risk assessment data and identify components
to be examined during the inspection. Additionally, during the first onsite week, time will be
The purpose of the information-gathering visit is to meet with members of your staff to identify  
needed on the plant-referenced simulator in order to facilitate the development of operator
components that have been modified, risk-significant components and operator actions.
action-based scenarios.
Information and documentation needed to support the inspection will also be identified.  
Mr. Andy Rosebrook, a Region II Senior Risk Analyst, will support Mr. Fanelli during the  
information-gathering visit to review probabilistic risk assessment data and identify components  
to be examined during the inspection. Additionally, during the first onsite week, time will be  
needed on the plant-referenced simulator in order to facilitate the development of operator  
action-based scenarios.


D. Stoddard                                   2
D. Stoddard  
The enclosure lists documents that will be needed prior to the information-gathering visit.
2  
Please provide the referenced information to the Region II Office by Friday, August 14, 2020.
The enclosure lists documents that will be needed prior to the information-gathering visit.
Additional documents will be requested following the information-gathering visit. The inspectors
Please provide the referenced information to the Region II Office by Friday, August 14, 2020.
will try to minimize your administrative burden by specifically identifying only those documents
Additional documents will be requested following the information-gathering visit. The inspectors  
required for inspection preparation. The additional information will be needed in the Region II
will try to minimize your administrative burden by specifically identifying only those documents  
office by Wednesday, September 2, 2020, to support the inspection teams preparation week.
required for inspection preparation. The additional information will be needed in the Region II  
During the information-gathering trip, Mr. Fanelli will also discuss the following inspection
office by Wednesday, September 2, 2020, to support the inspection teams preparation week.
support administrative details: (1) availability of knowledgeable plant engineering and licensing
During the information-gathering trip, Mr. Fanelli will also discuss the following inspection  
personnel to serve as points of contact during the inspection; (2) method of tracking inspector
support administrative details: (1) availability of knowledgeable plant engineering and licensing  
requests during the inspection; (3) licensee computer access; (4) working space; (5)
personnel to serve as points of contact during the inspection; (2) method of tracking inspector  
arrangements for site access; and (6) other applicable information.
requests during the inspection; (3) licensee computer access; (4) working space; (5)  
In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections,
arrangements for site access; and (6) other applicable information.  
Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter
and its enclosure will be available electronically for public inspection in the NRC Public
In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections,  
Document Room or from the Publicly Available Records (PARS) component of NRC's
Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter  
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
and its enclosure will be available electronically for public inspection in the NRC Public  
from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Document Room or from the Publicly Available Records (PARS) component of NRC's  
Reading Room).
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible  
Thank you for your cooperation in this matter. If you have any questions, regarding the
from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic  
information requested or the inspection, please contact Mr. Fanelli at 404-997-4433 or contact
Reading Room).  
me at 404-997-4506.
                                                Sincerely,
Thank you for your cooperation in this matter. If you have any questions, regarding the  
                                                James Baptist, Chief
information requested or the inspection, please contact Mr. Fanelli at 404-997-4433 or contact  
                                                Engineering Branch 1
me at 404-997-4506.  
                                                Division of Reactor Safety
Docket Nos.: 50-280, 50-281
License Nos.: DPR-32, DPR-37
Enclosure:
Notification of Surry Power Station
   Design Bases Assurance Inspection (Teams)
cc: Distribution via Listserv
Sincerely,  
James Baptist, Chief
Engineering Branch 1  
Division of Reactor Safety  
Docket Nos.: 50-280, 50-281  
License Nos.: DPR-32, DPR-37  
Enclosure:
Notification of Surry Power Station  
   Design Bases Assurance Inspection (Teams)
cc: Distribution via Listserv  




ML20171A348
ML20171A348
  OFFICE             RII:DRS       RII:DRS
   
  SIGNATURE                EJS2      TNF1 FOR JBB1
OFFICE  
  NAME                  T. Fanelli      J. Baptist
RII:DRS  
  DATE                  6/15/2020      6/15/2020
RII:DRS  
                                                 
   
                    INFORMATION REQUEST FOR SURRY POWER STATION
   
                        DESIGN BASES ASSURANCE INSPECTION (TEAMS)
   
Please provide the information electronically in .pdf files, Excel, or other searchable format on
CDROM (or Certrec, FTP site, SharePoint, etc.). The CDROM (or website) should be indexed
and hyperlinked to facilitate ease of use. The requested items below, identified with an asterisk
(*), should have a date range from February 1, 2017, until present.
SIGNATURE
1.    *List and brief description of permanent plant modifications including permanent plant
EJS2
      changes, design changes, set point changes, procedure changes, equivalency evaluations,
TNF1 FOR JBB1
      suitability analyses, calculations, and commercial grade dedications. Include an index of
      systems (system numbers/designators and corresponding names), the safety classification
      for each modification, and type of modification.
2.    From your most recent probabilistic safety analysis (PSA) excluding external events and
      fires:
            a. Two risk rankings of components from your site-specific PSA: one sorted by Risk
                Achievement Worth (RAW), and the other sorted by Birnbaum Importance
NAME
            b. A list of the top 500 cut-sets
T. Fanelli
          c. A list of the top 500 LERF contributors
J. Baptist
3.    From your most recent PSA including external events and fires:
            a. Two risk rankings of components from your site-specific PSA: one sorted by RAW,
                and the other sorted by Birnbaum Importance
            b. A list of the top 500 cut-sets
4.    Risk ranking of operator actions from your site-specific PSA sorted by RAW and human
      reliability worksheets for these items
5.    List of time-critical operator actions with a brief description of each action
DATE
6.    *List of components with low-design margins (i.e., pumps closest to the design limit for flow
6/15/2020
      or pressure, diesel generator close to design-required output, heat exchangers close to
6/15/2020
      rated design heat removal, and motor-operated valve risk-margin rankings, etc.) and
      associated evaluations or calculations
7.    *List and brief description of Root Cause Evaluations performed
8.    *List and brief description of common-cause component failures that have occurred
9.    List and brief description of equipment currently in degraded or nonconforming status.
10. *List and brief description of Operability Determinations and Functionality Assessments
11. *List and reason for equipment that has been classified in maintenance rule (a)(1) status
                                                                                          Enclosure


                                                2
12. *List of equipment on the sites Station Equipment Reliability Issues List, including a
    description of the reason(s) why each component is on that list, and summaries (if
Enclosure
    available) of your plans to address the issue(s) along with dates added or removed from
INFORMATION REQUEST FOR SURRY POWER STATION 
    the issues list
DESIGN BASES ASSURANCE INSPECTION (TEAMS)  
13. List of current operator work arounds/burdens
14. Copy of Updated Final Safety Analysis Report
Please provide the information electronically in .pdf files, Excel, or other searchable format on
15. Copy of Technical Specification(s)
CDROM (or Certrec, FTP site, SharePoint, etc.). The CDROM (or website) should be indexed
16. Copy of Technical Specifications Bases
and hyperlinked to facilitate ease of use. The requested items below, identified with an asterisk
17. Copy of Technical Requirements Manual(s)
(*), should have a date range from February 1, 2017, until present.  
18. Copy of the Quality Assurance Program Manual
19. Copy of Corrective Action Program Procedure(s)
1.  
20. Copy of Operability Determination Procedure(s)
*List and brief description of permanent plant modifications including permanent plant
21. Copy of Original SER with all Supplements
changes, design changes, set point changes, procedure changes, equivalency evaluations,
22. Copy of procedures addressing the following: Corrective Action Program (CAP),
suitability analyses, calculations, and commercial grade dedications.  Include an index of
    Modifications, design changes, set point changes, equivalency evaluations or suitability
systems (system numbers/designators and corresponding names), the safety classification
    analyses, commercial grade dedications, post-modifications testing, 10 CFR 50.59
for each modification, and type of modification.
    screenings and evaluations, and UFSAR updates.
23. List of motor operated valves and air operated valves in valve programs, and their
2.  
    associated design margin and risk ranking (Please Note JOG program commitments for
From your most recent probabilistic safety analysis (PSA) excluding external events and  
    MOVs and AOVs).
fires:
24. Primary AC and DC calculations for safety-related buses
25. One-line diagram of electrical plant (Electronic only)
a. Two risk rankings of components from your site-specific PSA:  one sorted by Risk
26. Index and legend for electrical plant one-line diagrams
Achievement Worth (RAW), and the other sorted by Birnbaum Importance
27. Piping and instrumentation diagrams (P&IDs) for safety-related systems (Electronic)
28. Index and legend for P&IDs
b. A list of the top 500 cut-sets
29. Index (procedure number, title, and current revision) of station Emergency Operating
    Procedures, Abnormal Operating Procedures, and Annunciator Response Procedures
c. A list of the top 500 LERF contributors
30. Copies of corrective action documents generated from previous CDBI / DBAI
31. Copy of any self-assessments performed, and corrective action documents generated, in
3.
    preparation for current DBAI
From your most recent PSA including external events and fires:
a. Two risk rankings of components from your site-specific PSA:  one sorted by RAW,  
and the other sorted by Birnbaum Importance
b. A list of the top 500 cut-sets 
4.  
Risk ranking of operator actions from your site-specific PSA sorted by RAW and human
reliability worksheets for these items
5.
List of time-critical operator actions with a brief description of each action
6.  
*List of components with low-design margins (i.e., pumps closest to the design limit for flow
or pressure, diesel generator close to design-required output, heat exchangers close to
rated design heat removal, and motor-operated valve risk-margin rankings, etc.) and
associated evaluations or calculations
7.  
*List and brief description of Root Cause Evaluations performed
8.  
*List and brief description of common-cause component failures that have occurred
9.  
List and brief description of equipment currently in degraded or nonconforming status.
10. *List and brief description of Operability Determinations and Functionality Assessments
11. *List and reason for equipment that has been classified in maintenance rule (a)(1) status


                                                3
2
32. Contact information for a person to discuss PSA information prior to and during the
    information-gathering trip (Name, title, phone number, and e-mail address)
12. *List of equipment on the sites Station Equipment Reliability Issues List, including a
description of the reason(s) why each component is on that list, and summaries (if
available) of your plans to address the issue(s) along with dates added or removed from
the issues list
13. List of current operator work arounds/burdens
14. Copy of Updated Final Safety Analysis Report
15. Copy of Technical Specification(s)
16. Copy of Technical Specifications Bases
17. Copy of Technical Requirements Manual(s)
18. Copy of the Quality Assurance Program Manual
19. Copy of Corrective Action Program Procedure(s)
20. Copy of Operability Determination Procedure(s)
21. Copy of Original SER with all Supplements
22. Copy of procedures addressing the following:  Corrective Action Program (CAP),
Modifications, design changes, set point changes, equivalency evaluations or suitability
analyses, commercial grade dedications, post-modifications testing, 10 CFR 50.59
screenings and evaluations, and UFSAR updates. 
23. List of motor operated valves and air operated valves in valve programs, and their
associated design margin and risk ranking (Please Note JOG program commitments for
MOVs and AOVs).
24. Primary AC and DC calculations for safety-related buses
25. One-line diagram of electrical plant (Electronic only)
26. Index and legend for electrical plant one-line diagrams
27. Piping and instrumentation diagrams (P&IDs) for safety-related systems (Electronic)
28. Index and legend for P&IDs
29. Index (procedure number, title, and current revision) of station Emergency Operating
Procedures, Abnormal Operating Procedures, and Annunciator Response Procedures
30. Copies of corrective action documents generated from previous CDBI / DBAI
31. Copy of any self-assessments performed, and corrective action documents generated, in
preparation for current DBAI
 
3  
32. Contact information for a person to discuss PSA information prior to and during the  
information-gathering trip (Name, title, phone number, and e-mail address)
}}
}}

Latest revision as of 08:56, 24 May 2025

Notification of Surry Power Station Design Bases Assurance Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000280/2020010 and 05000281/2020010
ML20171A348
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/19/2020
From: James Baptist
NRC/RGN-II/DRS/EB1
To: Stoddard D
Virginia Electric & Power Co (VEPCO)
References
IR 2020010
Download: ML20171A348 (6)


See also: IR 05000280/2020010

Text

June 19, 2020

Mr. Daniel G. Stoddard

Senior Vice President and

Chief Nuclear Officer

Innsbrook Technical Center

5000 Dominion Blvd.

Glen Allen, VA 23060-6711

SUBJECT: NOTIFICATION OF SURRY POWER STATION DESIGN BASES ASSURANCE

INSPECTION - U.S. NUCLEAR REGULATORY COMMISSION INSPECTION

REPORT 05000280/2020010 AND 05000281/2020010

Dear Mr. Stoddard:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a Design Bases Assurance Inspection (DBAI) at your Surry Power

Station during the weeks of September 14-18, 2020, and September 28-October 2, 2020.

Mr. Theo Fanelli, a Senior Reactor Inspector from the NRCs Region II office, will lead the

inspection team. The inspection will be conducted in accordance with Inspection Procedure

71111.21M, Design Bases Assurance Inspection (Teams), dated December 8, 2016 (ADAMS

ML16238A320).

The inspection will evaluate the capability of components that have been modified and risk-

significant/low-margin components to function as designed and to support proper system

operation. The inspection will also include a review of selected operator actions, operating

experience, and modifications.

During a telephone conversation on June 15, 2020, with Mr. Steve Newman, we confirmed

arrangements for an information-gathering site visit and the two-week onsite inspection. The

schedule is as follows:

Information-gathering visit: Week of August 24, 2020

Onsite weeks: Weeks of September 14 and September 28, 2020

The purpose of the information-gathering visit is to meet with members of your staff to identify

components that have been modified, risk-significant components and operator actions.

Information and documentation needed to support the inspection will also be identified.

Mr. Andy Rosebrook, a Region II Senior Risk Analyst, will support Mr. Fanelli during the

information-gathering visit to review probabilistic risk assessment data and identify components

to be examined during the inspection. Additionally, during the first onsite week, time will be

needed on the plant-referenced simulator in order to facilitate the development of operator

action-based scenarios.

D. Stoddard

2

The enclosure lists documents that will be needed prior to the information-gathering visit.

Please provide the referenced information to the Region II Office by Friday, August 14, 2020.

Additional documents will be requested following the information-gathering visit. The inspectors

will try to minimize your administrative burden by specifically identifying only those documents

required for inspection preparation. The additional information will be needed in the Region II

office by Wednesday, September 2, 2020, to support the inspection teams preparation week.

During the information-gathering trip, Mr. Fanelli will also discuss the following inspection

support administrative details: (1) availability of knowledgeable plant engineering and licensing

personnel to serve as points of contact during the inspection; (2) method of tracking inspector

requests during the inspection; (3) licensee computer access; (4) working space; (5)

arrangements for site access; and (6) other applicable information.

In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections,

Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter

and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Thank you for your cooperation in this matter. If you have any questions, regarding the

information requested or the inspection, please contact Mr. Fanelli at 404-997-4433 or contact

me at 404-997-4506.

Sincerely,

James Baptist, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos.: 50-280, 50-281

License Nos.: DPR-32, DPR-37

Enclosure:

Notification of Surry Power Station

Design Bases Assurance Inspection (Teams)

cc: Distribution via Listserv

ML20171A348

OFFICE

RII:DRS

RII:DRS

SIGNATURE

EJS2

TNF1 FOR JBB1

NAME

T. Fanelli

J. Baptist

DATE

6/15/2020

6/15/2020

Enclosure

INFORMATION REQUEST FOR SURRY POWER STATION

DESIGN BASES ASSURANCE INSPECTION (TEAMS)

Please provide the information electronically in .pdf files, Excel, or other searchable format on

CDROM (or Certrec, FTP site, SharePoint, etc.). The CDROM (or website) should be indexed

and hyperlinked to facilitate ease of use. The requested items below, identified with an asterisk

(*), should have a date range from February 1, 2017, until present.

1.

  • List and brief description of permanent plant modifications including permanent plant

changes, design changes, set point changes, procedure changes, equivalency evaluations,

suitability analyses, calculations, and commercial grade dedications. Include an index of

systems (system numbers/designators and corresponding names), the safety classification

for each modification, and type of modification.

2.

From your most recent probabilistic safety analysis (PSA) excluding external events and

fires:

a. Two risk rankings of components from your site-specific PSA: one sorted by Risk

Achievement Worth (RAW), and the other sorted by Birnbaum Importance

b. A list of the top 500 cut-sets

c. A list of the top 500 LERF contributors

3.

From your most recent PSA including external events and fires:

a. Two risk rankings of components from your site-specific PSA: one sorted by RAW,

and the other sorted by Birnbaum Importance

b. A list of the top 500 cut-sets

4.

Risk ranking of operator actions from your site-specific PSA sorted by RAW and human

reliability worksheets for these items

5.

List of time-critical operator actions with a brief description of each action

6.

  • List of components with low-design margins (i.e., pumps closest to the design limit for flow

or pressure, diesel generator close to design-required output, heat exchangers close to

rated design heat removal, and motor-operated valve risk-margin rankings, etc.) and

associated evaluations or calculations

7.

  • List and brief description of Root Cause Evaluations performed

8.

  • List and brief description of common-cause component failures that have occurred

9.

List and brief description of equipment currently in degraded or nonconforming status.

10. *List and brief description of Operability Determinations and Functionality Assessments

11. *List and reason for equipment that has been classified in maintenance rule (a)(1) status

2

12. *List of equipment on the sites Station Equipment Reliability Issues List, including a

description of the reason(s) why each component is on that list, and summaries (if

available) of your plans to address the issue(s) along with dates added or removed from

the issues list

13. List of current operator work arounds/burdens

14. Copy of Updated Final Safety Analysis Report

15. Copy of Technical Specification(s)

16. Copy of Technical Specifications Bases

17. Copy of Technical Requirements Manual(s)

18. Copy of the Quality Assurance Program Manual

19. Copy of Corrective Action Program Procedure(s)

20. Copy of Operability Determination Procedure(s)

21. Copy of Original SER with all Supplements

22. Copy of procedures addressing the following: Corrective Action Program (CAP),

Modifications, design changes, set point changes, equivalency evaluations or suitability

analyses, commercial grade dedications, post-modifications testing, 10 CFR 50.59

screenings and evaluations, and UFSAR updates.

23. List of motor operated valves and air operated valves in valve programs, and their

associated design margin and risk ranking (Please Note JOG program commitments for

MOVs and AOVs).

24. Primary AC and DC calculations for safety-related buses

25. One-line diagram of electrical plant (Electronic only)

26. Index and legend for electrical plant one-line diagrams

27. Piping and instrumentation diagrams (P&IDs) for safety-related systems (Electronic)

28. Index and legend for P&IDs

29. Index (procedure number, title, and current revision) of station Emergency Operating

Procedures, Abnormal Operating Procedures, and Annunciator Response Procedures

30. Copies of corrective action documents generated from previous CDBI / DBAI

31. Copy of any self-assessments performed, and corrective action documents generated, in

preparation for current DBAI

3

32. Contact information for a person to discuss PSA information prior to and during the

information-gathering trip (Name, title, phone number, and e-mail address)