ML20209D629: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 14: | Line 14: | ||
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE | ||
| page count = 3 | | page count = 3 | ||
| project = TAC:M97389, TAC:M98522 | |||
| stage = Other | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:. Mr. Jimia W. Ling:nbach, Vica Pr:sid:nt end Director, TMI | {{#Wiki_filter:. Mr. Jimia W. Ling:nbach, Vica Pr:sid:nt end Director, TMI July 8, 1999 GPU Nucinr, Inc. | ||
P.O. Box 480 Middletown, PA 17057 | P.O. Box 480 Middletown, PA 17057 | ||
| Line 25: | Line 26: | ||
==Dear Mr. Langenbach:== | ==Dear Mr. Langenbach:== | ||
The Commission issued Amendment Nos. 211 and 212 to Facility Operating License No. | The Commission issued Amendment Nos. 211 and 212 to Facility Operating License No. | ||
DPR-50 for the Three Mile Island Nuclear Station, Unit 1, (TMI-1) on June 15,1999, and June 21,1999, in response to your applications dated December 3,1996, and February 7, 1997, as supplemented by letter dated October 24,1998. | DPR-50 for the Three Mile Island Nuclear Station, Unit 1, (TMI-1) on June 15,1999, and June 21,1999, in response to your applications dated December 3,1996, and February 7, 1997, as supplemented by {{letter dated|date=October 24, 1998|text=letter dated October 24,1998}}. | ||
The amendments incorporate certain improvements from the Standard Technical Specifications for Babcock and Wilcox plants (NUREG-1430). It has come to our attention that Technical Specification (TS) pages 3-21 and 4-9 (for Amendment No. 211) and 4-Sa,4-38, and 6-3 (for Amendment No. 212) were issued in error in that they failed to reflect previously approved changes granted by Amendment Nos. 203 and 204 (in the case of Amendment No. 211), | The amendments incorporate certain improvements from the Standard Technical Specifications for Babcock and Wilcox plants (NUREG-1430). It has come to our attention that Technical Specification (TS) pages 3-21 and 4-9 (for Amendment No. 211) and 4-Sa,4-38, and 6-3 (for Amendment No. 212) were issued in error in that they failed to reflect previously approved changes granted by Amendment Nos. 203 and 204 (in the case of Amendment No. 211), | ||
and 207 (in the case of amendment no. 212). Additionally, the change to page 4-38, which was withdrawn by your October 24,1998, letter was inadvertently included in the issuance of Amendment No. 212. Enclosed are corrected pages 3-21,4-Sa,4-9,4-38, and 6-3. The Commission has filed the enclosed Notice of Partial Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication. We apologize for any inconvenience this may have caused you. | and 207 (in the case of amendment no. 212). Additionally, the change to page 4-38, which was withdrawn by your {{letter dated|date=October 24, 1998|text=October 24,1998, letter}} was inadvertently included in the issuance of Amendment No. 212. Enclosed are corrected pages 3-21,4-Sa,4-9,4-38, and 6-3. The Commission has filed the enclosed Notice of Partial Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication. We apologize for any inconvenience this may have caused you. | ||
Sincerely, ORIGINAL SIGNED BY: | Sincerely, ORIGINAL SIGNED BY: | ||
Timothy G. Colburn, Senior Project Manager, Section 1 | Timothy G. Colburn, Senior Project Manager, Section 1 | ||
$$ $$$g9 Dvision f L en ng Project Management P | |||
{ g { f (( { g g pj | PDR Office of Nuclear Reactor Regulation | ||
{ g { f (( { g g pj Docket No. 50-289 | |||
==Enclosures:== | ==Enclosures:== | ||
: 1. Notice of Withdrawal | : 1. Notice of Withdrawal | ||
: 2. TS pages 3-21,4-Sa,4-9,4-38, and 6-3 | : 2. TS pages 3-21,4-Sa,4-9,4-38, and 6-3 | ||
\\ | |||
cc w/encis: See next page | cc w/encis: See next page DISTRIBUTION: | ||
DISTRIBUTION: | Docket Filei E. Adensam (email) | ||
Docket Filei E. Adensam (email) | R. Eaton G. Hill (2) | ||
PUBLlC | R. Scholl (email SE) | ||
PDI-1 R/F | \\ | ||
DOCUMENT NAME: G:\PDI-1\TMl-1\COR97389.WPD To receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure 'E" = Copy with cttachment/ enclosure "N" = No copy | D PUBLlC S. Bajwa M. O'Brien W. Beckner P. Eselgroth, RI Q | ||
PDI-1 R/F T. Colburn OGC ACRS g\\ | |||
DOCUMENT NAME: G:\\PDI-1\\TMl-1\\COR97389.WPD To receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure | |||
'E" = Copy with cttachment/ enclosure "N" = No copy 3 | |||
. rip 0FFICE PM:PDI 1-QlE LA:PDI-1 g///y/ L SC:P@g) l OGC Q | |||
l l | |||
NAME TColburn/rsi M0*Brien ///#/// | |||
SBaj d A JRutberg /f DATE 07/1/99 07/ I//99 07F1 /99 07/"? /99 V | |||
/ | |||
Official ilecord Copy | |||
accooq 4 | |||
g g | |||
j | UNITED STATES g." | ||
P.O. Box 480 | j NUCLEAR REGULAJORY COMMISSION e | ||
Middletown, PA 17057 | WASHINGTON, D.C. 205550001 4 | ||
o 9 | |||
g 4,,g July 8,1999 Mr. James W. Langenbach, Vice President and Director, TMI GPU Nuclear, Inc. | |||
P.O. Box 480 Middletown, PA 17057 | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 57: | Line 69: | ||
==Dear Mr. Langenbach:== | ==Dear Mr. Langenbach:== | ||
The Commission issued Amendment Nos. 211 and 212 to Facility Operating License No. | The Commission issued Amendment Nos. 211 and 212 to Facility Operating License No. | ||
DPR-50 for the Three Mile Island Nuclear Station, Unit 1, (TMI-1) on June 15,1999,and June 21,1999, in response to your applications dated December 3,1996, and February 7, 1997, as supplemented by letter dated October 24,1998. | DPR-50 for the Three Mile Island Nuclear Station, Unit 1, (TMI-1) on June 15,1999,and June 21,1999, in response to your applications dated December 3,1996, and February 7, 1997, as supplemented by {{letter dated|date=October 24, 1998|text=letter dated October 24,1998}}. | ||
The amendments incorporate certain improvements from the Standard Technical Specifications for Babcock and Wilcox plants (NUREG-1430). It has come to our attention that Technical Specification (TS) pages 3-21 and 4-9 (for Amendment No. 211) and 4 Sa,4-38, and 6-3 (for Amendment No. 212) were issued in error in that they failed to reflect previously approved changes granted by Amendment Nos. 203 and 204 (in the case of Amendment No. 211), | The amendments incorporate certain improvements from the Standard Technical Specifications for Babcock and Wilcox plants (NUREG-1430). It has come to our attention that Technical Specification (TS) pages 3-21 and 4-9 (for Amendment No. 211) and 4 Sa,4-38, and 6-3 (for Amendment No. 212) were issued in error in that they failed to reflect previously approved changes granted by Amendment Nos. 203 and 204 (in the case of Amendment No. 211), | ||
and 207 (in the case of amendment no. 212). Additionally, the change to page 4-38, which was withdrawn by your October 24,1998, letter was inadvertently included in the issuance of Amendment No. 212. Enclosed are corrected pages 3-21,4-Sa,4-9,4-38, and 6-3. The Commission has filed the enclosed Notice of Partial Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication. We apologize for any inconvenience this may have caused you. | and 207 (in the case of amendment no. 212). Additionally, the change to page 4-38, which was withdrawn by your {{letter dated|date=October 24, 1998|text=October 24,1998, letter}} was inadvertently included in the issuance of Amendment No. 212. Enclosed are corrected pages 3-21,4-Sa,4-9,4-38, and 6-3. The Commission has filed the enclosed Notice of Partial Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication. We apologize for any inconvenience this may have caused you. | ||
Sincerely, f | Sincerely, f | ||
/N Timothy G. Colburn, Senior Project Manager, Section 1 Project Directorate l Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-289 | |||
==Enclosures:== | ==Enclosures:== | ||
| Line 68: | Line 80: | ||
: 2. TS pages 3-21,4-Sa,4-9,4-38, and 6-3 cc w/encls: See next page | : 2. TS pages 3-21,4-Sa,4-9,4-38, and 6-3 cc w/encls: See next page | ||
l l | l l | ||
Three Mile Islanri Nuclear Station, Unit No.1 cc: | l Three Mile Islanri Nuclear Station, Unit No.1 cc: | ||
Michael Ross | Michael Ross Robert B. Borsum Director, O&M, TMI B&W Nuclear Technologies GPU Nuclear, Inc. | ||
Parsippany, NJ 07054 | Suite 525 I | ||
Dauphin County Courthouse | P.O. Box 480 1700 Rockville Pike Middletown, PA 17057 Rockville, MD 20852 John C. Fornicola William Dornsife, Acting Director Director, Planning and Bureau of Radiation Protection 1 | ||
U.S. Nuclear Regulatory Commission P.O. Box 219 Middletown, PA 17057 L | Regulatory Affairs Pennsylvania Department of GPU Nuclear, Inc. | ||
Environmental Resources 100 Interpace Parkway P.O. Box 2063 | |||
{ | |||
Parsippany, NJ 07054 Harrisburg, PA 17120 Jack S. Wetmore Dr. Judith Johnsrud Manager, TMI Regulatory Affairs National Energy Committee i | |||
GPU Nuclear, Inc. | |||
Sierra Club P.O. Box 480 433 Orlando Avenue Middletown, PA 17057 State College, PA 16803 Ernest L. Blake, Jr., Esquire Peter W. Eselgroth, Region l Shaw, Pittman, Potts & Trowbridge U.S. Nuclear Regulatory Commission 2300 N Street, NW. | |||
475 Allendale Road Washington, DC 20037 King of Prussia, PA 19406 Chairman James W. Langenbach, Vice President Board of County Commissioners and Director - TMI of Dauphin County GPU Nuclear, Inc. | |||
Dauphin County Courthouse P.O. Box 480 Harrisburg, PA 17120 Middletown, PA 17057 Chairman Board of Supervisors of Londonderry Township R.D. #1, Geyers Church Road Middletown, PA 17057 Wayne L. Schmidt Senior Resident inspector (TMI-1) | |||
U.S. Nuclear Regulatory Commission P.O. Box 219 Middletown, PA 17057 L | |||
Regional Administrator Region i U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406}} | |||
Latest revision as of 18:19, 6 December 2024
| ML20209D629 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 07/08/1999 |
| From: | Colburn T NRC (Affiliation Not Assigned) |
| To: | Langenbach J GENERAL PUBLIC UTILITIES CORP. |
| Shared Package | |
| ML20209D634 | List: |
| References | |
| TAC-M97389, TAC-M98522, NUDOCS 9907130187 | |
| Download: ML20209D629 (3) | |
Text
. Mr. Jimia W. Ling:nbach, Vica Pr:sid:nt end Director, TMI July 8, 1999 GPU Nucinr, Inc.
P.O. Box 480 Middletown, PA 17057
SUBJECT:
CORRECTION LETTER AND NOTICE OF WITHDRAWAL - RE: AMENDMENT ISSUED ON CERTAIN IMPROVEMENTS FROM THE STANDARD TECHNICAL SPECIFICATIONS FOR BABCOCK AND WILCOX PLANTS - THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (TAC NOS. M97389 and M98522)
Dear Mr. Langenbach:
The Commission issued Amendment Nos. 211 and 212 to Facility Operating License No.
DPR-50 for the Three Mile Island Nuclear Station, Unit 1, (TMI-1) on June 15,1999, and June 21,1999, in response to your applications dated December 3,1996, and February 7, 1997, as supplemented by letter dated October 24,1998.
The amendments incorporate certain improvements from the Standard Technical Specifications for Babcock and Wilcox plants (NUREG-1430). It has come to our attention that Technical Specification (TS) pages 3-21 and 4-9 (for Amendment No. 211) and 4-Sa,4-38, and 6-3 (for Amendment No. 212) were issued in error in that they failed to reflect previously approved changes granted by Amendment Nos. 203 and 204 (in the case of Amendment No. 211),
and 207 (in the case of amendment no. 212). Additionally, the change to page 4-38, which was withdrawn by your October 24,1998, letter was inadvertently included in the issuance of Amendment No. 212. Enclosed are corrected pages 3-21,4-Sa,4-9,4-38, and 6-3. The Commission has filed the enclosed Notice of Partial Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication. We apologize for any inconvenience this may have caused you.
Sincerely, ORIGINAL SIGNED BY:
Timothy G. Colburn, Senior Project Manager, Section 1
$$ $$$g9 Dvision f L en ng Project Management P
PDR Office of Nuclear Reactor Regulation
{ g { f (( { g g pj Docket No. 50-289
Enclosures:
- 1. Notice of Withdrawal
- 2. TS pages 3-21,4-Sa,4-9,4-38, and 6-3
\\
cc w/encis: See next page DISTRIBUTION:
Docket Filei E. Adensam (email)
R. Eaton G. Hill (2)
R. Scholl (email SE)
\\
D PUBLlC S. Bajwa M. O'Brien W. Beckner P. Eselgroth, RI Q
PDI-1 R/F T. Colburn OGC ACRS g\\
DOCUMENT NAME: G:\\PDI-1\\TMl-1\\COR97389.WPD To receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure
'E" = Copy with cttachment/ enclosure "N" = No copy 3
. rip 0FFICE PM:PDI 1-QlE LA:PDI-1 g///y/ L SC:P@g) l OGC Q
l l
NAME TColburn/rsi M0*Brien ///#///
SBaj d A JRutberg /f DATE 07/1/99 07/ I//99 07F1 /99 07/"? /99 V
/
Official ilecord Copy
accooq 4
g g
UNITED STATES g."
j NUCLEAR REGULAJORY COMMISSION e
WASHINGTON, D.C. 205550001 4
o 9
g 4,,g July 8,1999 Mr. James W. Langenbach, Vice President and Director, TMI GPU Nuclear, Inc.
P.O. Box 480 Middletown, PA 17057
SUBJECT:
CORRECTION LETTER AND NOTICE OF WITHDRAWAL - RE: AMENDMENT ISSUED ON CERTAIN IMPROVEMENTS FROM THE STANDARD TECHNICAL SPECIFICATIONS FOR BABCOCK AND WILCOX PLANTS - THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (TAC NOS. M97389 and M98522)
Dear Mr. Langenbach:
The Commission issued Amendment Nos. 211 and 212 to Facility Operating License No.
DPR-50 for the Three Mile Island Nuclear Station, Unit 1, (TMI-1) on June 15,1999,and June 21,1999, in response to your applications dated December 3,1996, and February 7, 1997, as supplemented by letter dated October 24,1998.
The amendments incorporate certain improvements from the Standard Technical Specifications for Babcock and Wilcox plants (NUREG-1430). It has come to our attention that Technical Specification (TS) pages 3-21 and 4-9 (for Amendment No. 211) and 4 Sa,4-38, and 6-3 (for Amendment No. 212) were issued in error in that they failed to reflect previously approved changes granted by Amendment Nos. 203 and 204 (in the case of Amendment No. 211),
and 207 (in the case of amendment no. 212). Additionally, the change to page 4-38, which was withdrawn by your October 24,1998, letter was inadvertently included in the issuance of Amendment No. 212. Enclosed are corrected pages 3-21,4-Sa,4-9,4-38, and 6-3. The Commission has filed the enclosed Notice of Partial Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication. We apologize for any inconvenience this may have caused you.
Sincerely, f
/N Timothy G. Colburn, Senior Project Manager, Section 1 Project Directorate l Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-289
Enclosures:
- 1. Notice of Withdrawal
- 2. TS pages 3-21,4-Sa,4-9,4-38, and 6-3 cc w/encls: See next page
l l
l Three Mile Islanri Nuclear Station, Unit No.1 cc:
Michael Ross Robert B. Borsum Director, O&M, TMI B&W Nuclear Technologies GPU Nuclear, Inc.
Suite 525 I
P.O. Box 480 1700 Rockville Pike Middletown, PA 17057 Rockville, MD 20852 John C. Fornicola William Dornsife, Acting Director Director, Planning and Bureau of Radiation Protection 1
Regulatory Affairs Pennsylvania Department of GPU Nuclear, Inc.
Environmental Resources 100 Interpace Parkway P.O. Box 2063
{
Parsippany, NJ 07054 Harrisburg, PA 17120 Jack S. Wetmore Dr. Judith Johnsrud Manager, TMI Regulatory Affairs National Energy Committee i
GPU Nuclear, Inc.
Sierra Club P.O. Box 480 433 Orlando Avenue Middletown, PA 17057 State College, PA 16803 Ernest L. Blake, Jr., Esquire Peter W. Eselgroth, Region l Shaw, Pittman, Potts & Trowbridge U.S. Nuclear Regulatory Commission 2300 N Street, NW.
475 Allendale Road Washington, DC 20037 King of Prussia, PA 19406 Chairman James W. Langenbach, Vice President Board of County Commissioners and Director - TMI of Dauphin County GPU Nuclear, Inc.
Dauphin County Courthouse P.O. Box 480 Harrisburg, PA 17120 Middletown, PA 17057 Chairman Board of Supervisors of Londonderry Township R.D. #1, Geyers Church Road Middletown, PA 17057 Wayne L. Schmidt Senior Resident inspector (TMI-1)
U.S. Nuclear Regulatory Commission P.O. Box 219 Middletown, PA 17057 L
Regional Administrator Region i U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406