=Text=
=Text=
{{#Wiki_filter:m,                             .                                                                                                                                 _ - -                                                                                                                                 -
{{#Wiki_filter:m,
                          o                                                                                                                                                         -
.
                    y.
_ - -
        -
-
; ;;                                                                                                                                                                                                                                                                                                  ,
-
                "                                                                                    '
o
; ;;
y.
-
,
fs
fs
                                      ,
"
'
,
;
;
'
'
          ,
a
                        a        w.         .         .                                                                                                                                                                 .
w.
                        ,                     ". .-
.
.
.
,
,
". .-
d-
d-
                                                                                                                                            APPENDIX E
[ '( -
[ '( -                                                                   .
APPENDIX E
              '                                                     '
.
        c-                        -                                                                      U. S. NUCLEAR REGULATORY COMMISSION
'
'
U. S. NUCLEAR REGULATORY COMMISSION
c-
-
!J f * ''
!J f * ''
                                                          '
'
                                                                .
,r
                                                                        ,r                                                                             REGION IV
REGION IV
I                                           '
.
m.,                                    ,
I
                                                                    COMANCHE PEAK RESPONSE TEAM AC1IVITIES INSPECTION REPORT                                                                                                                                                                             ,
'
m.,
COMANCHE PEAK RESPONSE TEAM AC1IVITIES INSPECTION REPORT
,
,
l
l
                            ,
,
                                                  *
*
I .                                                                                                                                                                                                                                                                                                 ,
I .
  '
,
                  ,
'
                                          NRC Inspection' Report? 50-445/85-14                                                                                                             Permit: CPPR-126
NRC Inspection' Report? 50-445/85-14
                          '
Permit: CPPR-126
                                <
,
                                  ,'               s              :                                     50-446/85-11                                                                                                   CPPR-127
,'
                                          , Docket's:         50-445                                                                                                                       Category:                             A2
:
50-446/85-11
CPPR-127
<
s
'
, Docket's:
50-445
Category:
A2
l
l
              _ ,'
_ ,'
                                    ,
,
      .      ,
50-446'
              '
'
                                    ..
,
                                                            >
..
                                                              50-446'                                                                                                                                                                                                                                      ,
>
              '
.
!~                     .                  Applicant: -Texas Utilities Electric Company                                                                                                                                                                                                   v
,
!~
Applicant: -Texas Utilities Electric Company
'
.
v
l
l
              *
. Skyway Tower
                                                                  . Skyway Tower
*
;.
;.
400 North Olive ~ Street
'
'
                                                                    400 North Olive ~ Street
Lock Box 81
  -
-
                                                                    Lock Box 81
['
['                                                                 Dallas, Texas                                     75201                                                                                                                                                                     ,
Dallas, Texas
I                                         Facility Name:                   Comanche Peak Steam' Electric Station (CPSES), Units 1 and 2
75201
,
I
Facility Name:
Comanche Peak Steam' Electric Station (CPSES), Units 1 and 2
l
l
l                                          Inspection At: Glen Rose, Texas
l
l
l                                         Inspection Condu t d: October 1-31, 1985
Inspection At: Glen Rose, Texas
                                          Inspectors:                     b                                                 [                                                                                                                       c           fN
l
                                                                          L. E. Ellershaw, Reactor Inspector, Region IV                                                                                                                                   'DaYe
l
                                                                            CPSES Group
Inspection Condu t d: October 1-31, 1985
                                                                            (paragraphs 1, 2.a, 3, 6.b, 6.e-6.g, 6.j, 7.e-7.u)
Inspectors:
                                                                                                                      1
b
                                                                                                    -
[
                                                                                                                                          G                                                                                                          SM
fN
I                                                                                                         , Reactor Inspector, Region IV CPSES
c
                                                                                                              '
L. E. Ellershaw, Reactor Inspector, Region IV
                                                                                                                                                                                                                                                            D(ite ' ' ~ ~
'DaYe
CPSES Group
(paragraphs 1, 2.a, 3, 6.b, 6.e-6.g, 6.j, 7.e-7.u)
1
G
SM
-
I
C.J. @p, Reactor Inspector, Region IV CPSES
D(ite ' ' ~ ~
'
Grou
:
:
                                                                          C.J.
(paragraphs 1, 2.b, 4, 5, 6.c-6.d, 6.h-6.1)
                                                                            Grou@p
.
                                                                            (paragraphs 1, 2.b, 4, 5, 6.c-6.d, 6.h-6.1)
f&
              .
&.
$/7/8G,
p-
p-
'
'
                                                                      .A.
.A. R. Johnson, Reactor Inspector, Region IV
                                                                                                f&
Date
                                                                                R. Johnson, Reactor Inspector, Region IV
CPSES Group
                                                                                                                                                                                            &.                                                              $/7/8G,
3
                                                                                                                                                                                                                                                            Date
(paragraphs 1, 6.a, 7.s-7.e)
3                                                                            CPSES Group
                                                                            (paragraphs 1, 6.a, 7.s-7.e)
I
I
    '               '
'
                .                        Consultants:                   EG&G - R. Bonnenberg, J. Dale, L. Jones, A. Maughan, W. Richins,
'
                                                                      '
Consultants:
                                                                                              R.-VanderBeek
EG&G - R. Bonnenberg, J. Dale, L. Jones, A. Maughan, W. Richins,
.
R.-VanderBeek
'
i
i
I
I
          wi
wi
                                                                    .                                                                                                                                                                                                                          .
.
                                                    ,
,
                #
.
an____      - ' * * _.__________A_                    __ i______          _ _ -_ _ _ . _ . . _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ . _ _ _ _ _ _ _    _________________._____.;
#
an
- ' * * .
A
i
-
.
. .
.
.
.
.
.
.
.
.
.
_________________._____.;


      .- .         .     -                               ..     . _         ..     .   . . _ _ . _ -
.- .
    # a,
.
                                                      -2-
-
                            Parameter - J. Birmingham, D. Brown, J. Gibson, K. Graham,
..
                                        D. Jew,
.
            Reviewed By:         8w                                         -
_
                                                                                r/7/#6                     .
..
                            I. Barnes, Group Leader, Region IV CPSES Group     Date
.
            Approved:           l' f h F
. . _
                            T. F. Westerman, Chief, Region IV CPSES Group
_ . _ -
                                                                                3h/%
#
                                                                              Date /
a,
;         Inspection Summary
-2-
;.                                                                                                          '
Parameter - J. Birmingham, D. Brown, J. Gibson, K. Graham,
            Inspection Conducted: October 1-31, 1985 (Report 50-445/85-14; 50-446/85-11)
D. Jew,
  l
Reviewed By:
                                                                                                            '
8w
                                                                                                            >
r/7/#6
  ,        Areas Inspected: Nonroutine, unannounced inspection of applicant actions on                    .
-
!
.
            previous inspection findings, followup on alleged contractor improprieties,
I. Barnes, Group Leader, Region IV CPSES Group
            Comanche Peak Response Team (CPRT) procedures and instructions, and CPRT issue                  1
Date
            - specific action plans (ISAPs). The inspection involved 2363 inspector hours
Approved:
            onsite by 5 NRC inspectors and 11 consultants.      A summary of NRR and IE audit
l' f h F
            activities is provided in paragraph 4.                                                          ;
3h/%
T. F. Westerman, Chief, Region IV CPSES Group
Date /
;
Inspection Summary
'
'
            Results: Within the four areas inspected, two violations (revision of drawings
;.
            without required review and approval actions, paragraph 2.a; signing of
Inspection Conducted: October 1-31, 1985 (Report 50-445/85-14; 50-446/85-11)
f
l
            inspection reports by a noncertified electrical inspector, paragraph 8.c) and
'
            four deviation (ERC equipment / service requests not controlled as committed,
>
            paragraph 6.a; inadequate ERC document review and procedure criteria with                       *
,
.          respect to nonrecreatable and inaccessible inspection attributes, paragraphs
Areas Inspected: Nonroutine, unannounced inspection of applicant actions on
            8.c and 8.e; failure of ERC document reviewers to detect a lapsed electrical
.
            inspector certification and to record required information in a verification
!
i          package, paragraph 8.c; and in>pection attributes being attested to as
previous inspection findings, followup on alleged contractor improprieties,
            acceptable by ERC inspectors which were found by subsequent NRC inspection to
Comanche Peak Response Team (CPRT) procedures and instructions, and CPRT issue
            be unacceptable, paragraphs 8.e, 8.1, and 8.u) were identified.
1
- specific action plans (ISAPs). The inspection involved 2363 inspector hours
onsite by 5 NRC inspectors and 11 consultants.
A summary of NRR and IE audit
activities is provided in paragraph 4.
;
'
Results: Within the four areas inspected, two violations (revision of drawings
without required review and approval actions, paragraph 2.a; signing of
inspection reports by a noncertified electrical inspector, paragraph 8.c) and
f
four deviation (ERC equipment / service requests not controlled as committed,
paragraph 6.a; inadequate ERC document review and procedure criteria with
respect to nonrecreatable and inaccessible inspection attributes, paragraphs
*
.
8.c and 8.e; failure of ERC document reviewers to detect a lapsed electrical
inspector certification and to record required information in a verification
package, paragraph 8.c; and in>pection attributes being attested to as
i
acceptable by ERC inspectors which were found by subsequent NRC inspection to
be unacceptable, paragraphs 8.e, 8.1, and 8.u) were identified.
,
,
l
l
.
.
.
m
.
.
.
.
.
.
.
.
.
.
. .
.
.


                                                                                                                                            ~
{.,fff
                                                  i
.,,
                                                                                                                                                          .I
,
{.,fff          ,
i
                                                      w -
~
                                                          .,,
.I
                                                                    -
.
                                                                      ,
w -
                                                                                            ,     .
,
                                                . _
-
                        ,
,
                              ?       b
. _
                    t ,                                                                    4                                                                     )_
,
                        r    .: ,
t ,
                                                                                                *
?
                                                                                                                                                's                     !
b
  [.                                                    i
4
                                                                                  .,
)_
                                                                                                              -3-
.:
                                                                                    '
r
                                                              ,             f                _
,
                                        ,
*
                                                    .
[.
                                                                                                                                                                              ..
i
                                                                .                                   <
's
                                                              ,                                                                                                                 ,
!
  '       '                                                                                                                                                                   '
.,
                                        L                                                                   DETAILS
f
                    g,,                                 t                            .
_
                                                                                        ,                                                           ,
-3-
  >g                           .
'
                                                1. ,* Persons Contacted                                                                                         ,
,
                                                                                                                                                                                  -
,
                                                                                                                                                                                  ,
.
                          m,               .
..
                                                            ~ ~D.: L Andrews, TUSI Director of Corporate Security
.
                  ,},                     '
<
                                                                J. Arros, TERA Civil / Structural Issue Coordinator '                                                 -   -
,
                                                                C. I..Browne, Project Manager, R. L.' Cloud & Associates,.Inc.
,
                                                                              .
'
                                                                                                                                                                          *
'
                          ,
'
                                                              ^R. E. Camp,' Assistant Project General Manager, Unit 1 (Impe11
L
                                                                    scorp.)                                                                                                 -
t
      ,                                                        J..Finneran, TUGC0 Lead Pipe Support Engineer                       ,
DETAILS
                                                                                                                                                                                ;
.
    ,
g,,
                                                              *S. M. Franks, Special Projects and Technical Support Lead (Impe11
.
  ,             .                    _
,
                                                            .
,
                                                                    . Corp.)
>g
          '
1. ,* Persons Contacted
                                                              *J. B. George, TUGC0 Vice President, Plant General Manager
,
                        ,
-
                                                              *P. E. Halstead, TUGC0 Site QC Manager
,
                                                                J. L. Hansel, ERC QA/QC Review Team Leader _                                                                     .
,},
                                                                  C. K. Moehlm6n, TUGC0 Project Mechanical Engineer
.
                                                              *C. Killough,' TUGC0 Supervisor, Operations Quality                                                               .
~ ~D.: L Andrews, TUSI Director of Corporate Security
                                                                M. Obert,.ERC TRT Issue Coordinator
m,
                                                                  A. Patterson, ERC Engineering Supervisor
J. Arros, TERA Civil / Structural Issue Coordinator '
-
-
'
C. I..Browne, Project Manager, R.
L.' Cloud & Associates,.Inc.
*
^R. E. Camp,' Assistant Project General Manager, Unit 1 (Impe11
.
,
scorp.)
-
J..Finneran, TUGC0 Lead Pipe Support Engineer
,
;
,
*S. M. Franks, Special Projects and Technical Support Lead (Impe11
,
. Corp.)
,
.
_
.
*J. B. George, TUGC0 Vice President, Plant General Manager
'
*P. E. Halstead, TUGC0 Site QC Manager
.
,
J. L. Hansel, ERC QA/QC Review Team Leader _
C. K. Moehlm6n, TUGC0 Project Mechanical Engineer
*C. Killough,' TUGC0 Supervisor, Operations Quality
.
M. Obert,.ERC TRT Issue Coordinator
A. Patterson, ERC Engineering Supervisor
C. Spinks, ERC Inspection Supervisor
*i. G. Tyler, TUGC0 CPRT Program Director
'
*C. H. Welch, TUGC0 QC Services-Supervisor
.
R. Werner, Manager,. Safeteam
:
'
*P. B. Stevens, TUGC0 Project Electrical Engineer
G. Benfer, Bahnson Services Co. Site QA Manager
D. W. Snow, Brown & Root (B&R) QA/QC Coordinator
,
'
T. Wright, TUGC0 civil Engineer
.
*G. W. Ross, ERC Onsite QA Representative
J. Adam, ERC Supervisor, Safety. Significance Evaluation Group
D. M.. Kim, Principal Mechanical Engineer, Gibbs & Hill (G&H)
l
T. Brandt, TUGC0 Quality Engineering Supervisor
J. R Honekamp, TRT Issues Manager, TERA
,
P. Turi, TERA Issue Coordinator
i
G. Purdy, B&R QA Manager
'
'
                                                                  C. Spinks, ERC Inspection Supervisor
J. E. Young, ERC Issue Coordinator
                                                              *i. G. Tyler, TUGC0 CPRT Program Director
J. R. Gelzer, ERC Issue Coordinator
                                                              *C. H. Welch, TUGC0 QC Services-Supervisor
S. L. Crawford, ERC Issue Coordinator -
                                                                        .
,
                                                                  R. Werner, Manager,. Safeteam                                                                                  :
P. Thomas,.ERC Supervisor, Inspection Group Services
                                                                                                                                                                                  '
;
                                                              *P. B. Stevens, TUGC0 Project Electrical Engineer
'
                                                                  G. Benfer, Bahnson Services Co. Site QA Manager                                                                ,
D. Alexander, ERC Supervisor, Herdware Issues
                                                                                                                                                                                  '
J.
                                                                D. W. Snow, Brown & Root (B&R) QA/QC Coordinator
P. Amoroso, ERC Supervisor, Eardware Collective Evaluation
                                                                  T. Wright, TUGC0 civil Engineer
R. Melton, TERA Documentation Coordinator
                                                                      .
*
                                                              *G. W. Ross, ERC Onsite QA Representative
J. Ma11anda, CPRT Electrical Review Team Leader
                                                                  J. Adam, ERC Supervisor, Safety. Significance Evaluation Group
*
                                                                  D.          M.. Kim, Principal Mechanical Engineer, Gibbs & Hill (G&H)                                      l
.
                                                                  T. Brandt, TUGC0 Quality Engineering Supervisor
*Denntes those persons who attended the exit interview.
                                                                  J. R Honekamp, TRT Issues Manager, TERA                                                                        ,
The NRC inspectors also contacted other CPRT and appitcant employees
                                                                  P. Turi, TERA Issue Coordinator                                                                                i
l
                                                                  G. Purdy, B&R QA Manager                                                                                          '
<
                                                                  J. E. Young, ERC Issue Coordinator
during this inspection period.
                                                                  J. R. Gelzer, ERC Issue Coordinator
.
                                                                  S. L. Crawford, ERC Issue Coordinator -                                                                         ,
i
                    '
.
                                                                  P. Thomas,.ERC Supervisor, Inspection Group Services                                                           ;
I
                                                                  D. Alexander, ERC Supervisor, Herdware Issues
4
  J.                                                               P. Amoroso, ERC Supervisor, Eardware Collective Evaluation
l
                                                                  R. Melton, TERA Documentation Coordinator                                                                     *
'
                                                                  J. Ma11anda, CPRT Electrical Review Team Leader                                                               *
'
        .
}
                                                              *Denntes those persons who attended the exit interview.
.
        <
d
                                                                  The NRC inspectors also contacted other CPRT and appitcant employees                                             l
a
                                                                  during this inspection period.
.
                                                                                                                                                                                  .
*
                                                                                                                                                                                    i
' ' " '
              .
*
                                                  I                                                                                                           4
- '
                                  l                                                                                                                       '                       '
.
                                                                                                                                                        }
3'
                                                                          .
. .
                                                                                                                                                                d
.
                                                                                                                                                    a
.
                                                                                                                                                                                    .
.
                                                                                                                                          ' ' " '           *     - '
.
                                              3'     *
.


    -   -                                                               .
-
        :,.
-
.
;,A
;,A
                            .
:,.
                                                                s
f,                                                    -4-
            2.    Applicant Actions on Frevious Inspection Findings
                  a.  (0 pen) Open Item (445/3511-0-04): This item remains open pending the
                        review and assessmant of the dispositions relating to the 12
  ,                    deviatir.g skewed welus in NF supports.
                        Further review with respect to the status of this item has resulted
                        in the NRC's identification of a violation.
                        During ERC's reinspection of skewed welds in Unit 1, unde. size
                        conditions were identified and documented on B&R nonconformance
;                      reports (NCRs) as early as June 1985. CPSES Station Administration
                        Manual Procedure No. STA-405 requires that all documented
                        nonconformances, in which "use-as-is" dispositions are recommended,
                        be forwarded to TUGC0 Operations Results Engineering Group for review
                        to determine if as-built documentation changes are needed. Further,
                        CPSES Nuclear Operations Engineering Manual Instruction No. N0E-201-5
                        requires that proposed drawing changes be submitted to Operations for
                        review, approval, and authorization to distribute the revised
                        drewing.
                        The NCRc associated with the undersize skewed welds are identified as
                        XI-2, -3, -4, -5, -6, -7, -8, -10 and -11. The applicable pipe
                        support drawings were resised by TUGC0 Nuclear Engineering (TNE) to
                        reflect the undersize weld conditions. Recalculations were performed
                        to support the use of the welds without rework or repairs. While the
                        NCRs were not formally dispositioned, this action, in effect,
                        provided a "use-as-is" disposition. However, TUGC0 Operations did
                        not review and approve the drawing revisions. In fact, in most cases
                        TUGC0 Operations did not initiate their own NCR to address these
                        conditions until after INE had' revised and distributed the drawings.
                        As of the end of this report period, TUGC0 Operations NCRs have not
                        been dispositioned.     The NRC inspector was informed by TUGC0
.
.
s
f,
-4-
2.
Applicant Actions on Frevious Inspection Findings
a.
(0 pen) Open Item (445/3511-0-04): This item remains open pending the
review and assessmant of the dispositions relating to the 12
deviatir.g skewed welus in NF supports.
,
Further review with respect to the status of this item has resulted
in the NRC's identification of a violation.
During ERC's reinspection of skewed welds in Unit 1, unde size
.
conditions were identified and documented on B&R nonconformance
;
reports (NCRs) as early as June 1985.
CPSES Station Administration
Manual Procedure No. STA-405 requires that all documented
nonconformances, in which "use-as-is" dispositions are recommended,
be forwarded to TUGC0 Operations Results Engineering Group for review
to determine if as-built documentation changes are needed.
Further,
CPSES Nuclear Operations Engineering Manual Instruction No. N0E-201-5
requires that proposed drawing changes be submitted to Operations for
review, approval, and authorization to distribute the revised
drewing.
The NCRc associated with the undersize skewed welds are identified as
XI-2,
-3,
-4, -5,
-6, -7,
-8, -10 and -11.
The applicable pipe
support drawings were resised by TUGC0 Nuclear Engineering (TNE) to
reflect the undersize weld conditions.
Recalculations were performed
to support the use of the welds without rework or repairs. While the
NCRs were not formally dispositioned, this action, in effect,
provided a "use-as-is" disposition.
However, TUGC0 Operations did
not review and approve the drawing revisions.
In fact, in most cases
TUGC0 Operations did not initiate their own NCR to address these
conditions until after INE had' revised and distributed the drawings.
As of the end of this report period, TUGC0 Operations NCRs have not
been dispositioned.
The NRC inspector was informed by TUGC0
.
Operations personnel that their review has found a number of
'
'
                        Operations personnel that their review has found a number of
mathematical errors in the TNE recalculations, thus precluding a
                        mathematical errors in the TNE recalculations, thus precluding a
dispositioning of the TUGC0 NCRs.
                        dispositioning of the TUGC0 NCRs.
!
!                       The failure of TNE to acquire TUGC0 Operations review and approval
The failure of TNE to acquire TUGC0 Operations review and approval
                        prior to initiating drawing revisions is a violation
prior to initiating drawing revisions is a violation
                        (445/8514-V-03).                                                     ,
(445/8514-V-03).
                  b.   (Closed) Open Item (445/8513-0-06): Pecvisions for familiarizing QC
,
                        inspectors with changes in QC inspection procedures. Details on this
b.
                        subject are contained in paragraph 7.d of this appendix.
(Closed) Open Item (445/8513-0-06):
            3.     Followup On Alleged Contractor Improprieties
Pecvisions for familiarizing QC
                  The NRC inspector performed a followup inspection with respect to the
inspectors with changes in QC inspection procedures.
                  identification by a local newspaper of alleged contractor improprieties.
Details on this
                  The inspection was_ performed to ascertain whether the alleged             ;
subject are contained in paragraph 7.d of this appendix.
      -_      --_                _
3.
Followup On Alleged Contractor Improprieties
The NRC inspector performed a followup inspection with respect to the
identification by a local newspaper of alleged contractor improprieties.
The inspection was_ performed to ascertain whether the alleged
;
-
--
-


                                                    _           _
.
                            .
_
  ;            . .
_
                    ,                             ,
;
t?li ',
. .
        .
,
                              ,
,
                              -
t?li '
                                      ;
;
                                      ,
,
  .c       ~     ,     n,
-
                                              i
,
                        ~
.
    -                                         *
,
                                                                                      5
.c
                      ,
~
                                        ,
n,
                                      '               '
,
                                        improprictles, if substantiated, could adversely affect safety-related
i
              i
~
                                ,      components and systems. NRC review of this subject revealed that the
5
          .                            alleged improprieties, which consisted of eight specific items, had been
-
                                        reviewed by the TUGC0 Safeteam and by the TUSI Director of Coroorate
*
                                        Security. NRC examination of the items, certain of which were
,
                                        substantiated, resulted in a determination that there was no instance
,
                                        whers any substantiated item had any impact with respect to safety-related
'
                                        components or systems.
'
                                        The NRC considers this item to be closed.                                             ,
improprictles, if substantiated, could adversely affect safety-related
components and systems.
NRC review of this subject revealed that the
i
,
alleged improprieties, which consisted of eight specific items, had been
.
reviewed by the TUGC0 Safeteam and by the TUSI Director of Coroorate
Security. NRC examination of the items, certain of which were
substantiated, resulted in a determination that there was no instance
whers any substantiated item had any impact with respect to safety-related
components or systems.
The NRC considers this item to be closed.
,
''
''
                                . 4.   NRR and IE Audit / Inspection Activities
. 4.
                                        4.       NRR;     A site inspection was performed during October 10-11, 1985,
NRR and IE Audit / Inspection Activities
                                                pertaining to civil / structural issues. Audits were performed on
4.
;                                               October 25, 1985, at Ebasco and Stcne and Webster, New York,
NRR;
                                                pertaining, respectively, to cable tray / conduit supports and small
A site inspection was performed during October 10-11, 1985,
                                                bore piping review. A site audit was performed of homogeneity of
pertaining to civil / structural issues. Audits were performed on
                                                construction processes during October 9-10, 16-18, and 28-31, 1985.
;
                                        b.       IE: An inspection of Design Adequacy Review was initiated at TERA.
October 25, 1985, at Ebasco and Stcne and Webster, New York,
                                                Bethesda, Maryland, during October 28 through Nover.ber 4,1985. A
pertaining, respectively, to cable tray / conduit supports and small
                                                site inspection of QA program procedures was performed on
bore piping review.
                                                October 20-24, 1985.
A site audit was performed of homogeneity of
                                            ,
construction processes during October 9-10, 16-18, and 28-31, 1985.
                                                Copies of reports for these activities will be placed in the Public
b.
                                                Document Room upon completion.
IE:
                                  5.   CPRT Procedures and Instructions
An inspection of Design Adequacy Review was initiated at TERA.
                                        a.       Implementaticn of ERC Procedures and Instructions
Bethesda, Maryland, during October 28 through Nover.ber 4,1985.
                                                (1) Audit of_CPP-012 (QA/QC Interface with Constructor /TUGCO)
A
                                                        The TUGC0 interface consists of three systems used to request
site inspection of QA program procedures was performed on
                                                        equipment or services, copies of documents, or technical
October 20-24, 1985.
                                                        information. Each is handled by a differer,t process, as defined
,
                                                        in CPP-012.
Copies of reports for these activities will be placed in the Public
                                                                                                                              '
Document Room upon completion.
                                                        (a) Written requests for equipment and services are used by the
5.
                                                                  QA/QC inspectors to recuest from TUGC0 or B&R any equipment ,
CPRT Procedures and Instructions
                                                                  or services needed to perform an inspection. These         ;
a.
                                                                  requests are included in the completed inspection package. -
Implementaticn of ERC Procedures and Instructions
                                                              -
(1) Audit of_CPP-012 (QA/QC Interface with Constructor /TUGCO)
                                                                  An NRC inspection of CPP-012 implementation showed that the
The TUGC0 interface consists of three systems used to request
                                                                  requests for equipment and services were being processed in
equipment or services, copies of documents, or technical
      .
information.
        F
Each is handled by a differer,t process, as defined
                          f                             4
in CPP-012.
                                                                                                                              b
'
                                                            s
(a) Written requests for equipment and services are used by the
            i
QA/QC inspectors to recuest from TUGC0 or B&R any equipment
                                          L
,
or services needed to perform an inspection.
These
;
requests are included in the completed inspection package.
-
-
An NRC inspection of CPP-012 implementation showed that the
requests for equipment and services were being processed in
.
F
f
4
b
s
i
L


    <
<
  .
.
                              -6-
-6-
          accordance with CPP-012 requirements, with the exception
accordance with CPP-012 requirements, with the exception
          that the QA/QC Records Administrator was not controlling
that the QA/QC Records Administrator was not controlling
          these requests as required by Section 4.4.6 of the
these requests as required by Section 4.4.6 of the
          procedure.   No logs or files were maintained by +.he QA/QC
procedure.
          Records Administrator. This item is an NRC deviation
No logs or files were maintained by +.he QA/QC
          (445/8514-D-01). During this inspection, the NRC inspector
Records Administrator.
          concluded from information provided by ERC personnel that a
This item is an NRC deviation
          log of requests was not being naintained by the QA/QC
(445/8514-D-01). During this inspection, the NRC inspector
          Inspection Supervisor, as required by Section 5.1.3 of
concluded from information provided by ERC personnel that a
          CPP-012.   Subsequent to this report period, the NRC was
log of requests was not being naintained by the QA/QC
          inforn:ed by ERC management that this understanding was
Inspection Supervisor, as required by Section 5.1.3 of
          incorrect and that the required log was, in fact, being
CPP-012.
          maintained in accordance with CPP-012 requirements.
Subsequent to this report period, the NRC was
          Followup inspection confirmed that the ERC clanagenent
inforn:ed by ERC management that this understanding was
          information was correct. It was ascertained, however,
incorrect and that the required log was, in fact, being
          during this followup inspection that verification package
maintained in accordance with CPP-012 requirements.
          numbers were being used to identify requests in the log.
Followup inspection confirmed that the ERC clanagenent
          This practice permits more than one request to have the
information was correct.
          same identification number and is ccntrary to procedural
It was ascertained, however,
          requirements for use of unique identification numbers.
during this followup inspection that verification package
          TUGC0 has been requested by the transmittal letter for this
numbers were being used to identify requests in the log.
          inspection report to include this subject in their response
This practice permits more than one request to have the
          to deviation 445/8514-D-01.
same identification number and is ccntrary to procedural
l     (b) Document requests are used to request copies of TUGC0 or
requirements for use of unique identification numbers.
          Cid documents required by the ERC inspectors. Section 5.2.2
TUGC0 has been requested by the transmittal letter for this
          of CPP-012 requires that the QA/QC issue coordinators
inspection report to include this subject in their response
          maintain a file of these requests.     The files of two issue
to deviation 445/8514-D-01.
          coordinators were inspected by the NRC, and found to be
l
          satisfactory.
(b) Document requests are used to request copies of TUGC0 or
          No NRC deviations were identified.
Cid documents required by the ERC inspectors.
      (c) Technical information requests are prepared by a member of
Section 5.2.2
          the QA/QC Review Team when a request for clarification or
of CPP-012 requires that the QA/QC issue coordinators
          additional information is required.     These, after
maintain a file of these requests.
          supervisory approval, are sent to the responsible TUGC0
The files of two issue
          liaison engineer by the QA/QC Records Administrator, who
coordinators were inspected by the NRC, and found to be
          also log and files the requests.     The logged item is
satisfactory.
          closed and the request filed when the information arrives
No NRC deviations were identified.
          from the TUGC0 liaison er.gineer. Two specific requests
(c) Technical information requests are prepared by a member of
          were traced t;y the HRC inspector through the Construction
the QA/QC Review Team when a request for clarification or
          Sampling Reinspection Engineering Group and Recoros
additional information is required.
          Administration, and found to have been satisfactorily
These, after
supervisory approval, are sent to the responsible TUGC0
liaison engineer by the QA/QC Records Administrator, who
also log and files the requests.
The logged item is
closed and the request filed when the information arrives
from the TUGC0 liaison er.gineer.
Two specific requests
were traced t;y the HRC inspector through the Construction
Sampling Reinspection Engineering Group and Recoros
Administration, and found to have been satisfactorily
!
!
          processed and routed.
processed and routed.
          No hRC deviations were identified.
No hRC deviations were identified.


7<
1
. ,
-
o
o
                      7<                      1        . ,                                                    -
4
        4                  +o                               }-       ,                ,
+o
                                                                                                  s
}-
                                                                                                        '
'
                                                                                                                  .
'
                                                                                                                                            '        "  >
"
          ?                       ..
s
                                                                <                                                                                     ,
.
                    l'                                           _
>
                                                                                                                                                                      i
,
                                                  <'           q1                             *
,
              ,
?
                                                                                                            .. y
<
                                              .
,
                                                                                                                                                  !
..
'          '
l'
                                        '
_
                    -
*
                                                                          (2) CPP-018(QA/QC Interface with the Design Adequacy ProgramJ
i
                                                                                  An NRC inspection confirmed that documents transmitted from ERC                   ,
<'
:.                                                                                to TERA for infermation only were transmitted by the QA/QC
q1
  "
,
                                                                                  Records' Administrator. Documents requiring feedback from TERA
.. y
                                                                                  are logged and transmitted by the ERC Hardvare Isay s
.
                                                                                  Supervisor.
!
            '
'
                                                                                  The TERA Design Adequacy Program Interface Coordinator receives             -
'
                                          '
(2) CPP-018(QA/QC Interface with the Design Adequacy ProgramJ
                                                                                  the ERC domments, distributes them and files one copy. Items                         '
'
        ~
-
        '
An NRC inspection confirmed that documents transmitted from ERC
                                                                                  requiring feedback to ERC are logged in and the date of reply is.
,
                                                                                  also logged. .The HRC inspector selected four documsats from the       .
to TERA for infermation only were transmitted by the QA/QC
                                                                                  ERC log and was able to satisfactorily trace them through the
: .
                                                                                                                                  ~
Records' Administrator.
                                                                                  ERC and TERA logging and filing systems.
Documents requiring feedback from TERA
                                                                                  No NRC deviat, ions ~were identifled.
"
                                                                        - (3).CPP-010(PreparationofDeviationRNports)andCPP-016'(Safety
are logged and transmitted by the ERC Hardvare Isay s
                                                                                  Significance Evaluations of Deviation Reports)
Supervisor.
                                                      '
The TERA Design Adequacy Program Interface Coordinator receives
                                                                                  ' Deviation Reports (DRs) are generated during thekardware and
-
                                                                                  documentation inspection process. These DRs are' assessed <for
'
                                                                                  validity then forwarded for further processing to the Safety-                   '
'
                                                                                  Significance Evaluation Group (SSEG) and'TUGCO.
the ERC domments, distributes them and files one copy.
                        .
Items
                                                                                1he NRC inspector confirmed that the process,(which is described
'
                                                                                            '
'
          '
requiring feedback to ERC are logged in and the date of reply is.
                                      ,
also logged. .The HRC inspector selected four documsats from the
                                                                                  'in CPP.010 and CPP-016, is being'followed. A sample of twenty
~
                                ,
.
                                                                                  ,0Rs was' selected from the SSEG tracking systenc ~ Each OR was
ERC log and was able to satisfactorily trace them through the
                                                                                                                                                                          4
~
                                                                                ' verified to be correctly processed and documented by checking
ERC and TERA logging and filing systems.
              .
No NRC deviat, ions ~were identifled.
                              ,
- (3).CPP-010(PreparationofDeviationRNports)andCPP-016'(Safety
                                          '
Significance Evaluations of Deviation Reports)
                                                                                  each'for: (a) signatures of' originator, first reviewer, and                           ;
' Deviation Reports (DRs) are generated during thekardware and
                                                                                    second reviewer; (b) transmission of the DR to MUGC0 and SSEG,
'
                                                                                    (c) transmission cf the DR to the proper distribution;
documentation inspection process.
,                                          .
These DRs are' assessed <for
                                                                                    (d) filing of the DR in the verification package; and'                       '
validity then forwarded for further processing to the Safety-
                                                                  '
'
                                                                              , (e) onfirmation from TUGC0 or B&R that they had assigned an NCR
Significance Evaluation Group (SSEG) and'TUGCO.
,:                .
.
                                ,
1he NRC inspector confirmed that the process,(which is described
                                                                                  - nut.oer to the DR. ; Revision 3 to CPP-010, which was released on
'
              '
'in CPP.010 and CPP-016, is being'followed.
                          <'                                                       October 11, 1985, incorporates provisions'.for revision,.
A sample of twenty
                                                                                  cancellation, or; invalidation of a DR.
,
    '
'
                                                                    ,
,0Rs was' selected from the SSEG tracking systenc ~ Each OR was
                          .
4
                                            ,
,
    i                 ,
' verified to be correctly processed and documented by checking
                            <
'
                                  ,
,
                                                                                  No NRC. deviations were identified.
each'for: (a) signatures of' originator, first reviewer, and
                                                            s                                       .                                                       ,
;
                                              *
.
                                                                          (4) CPP-020 (Out-of-Scope Observations)                             '
second reviewer; (b) transmission of the DR to MUGC0 and SSEG,
      '
(c) transmission cf the DR to the proper distribution;
                                                                                                                                                                    *
(d) filing of the DR in the verification package; and'
t
'
                                                    -
.
                                                                                  . Review team'personn'el are instructed in CPP-020(to report
,
                                                  ,                              apparent out-of-scope observation %by three part memorandum to                 '
'
                                                *
, (e) onfirmation from TUGC0 or B&R that they had assigned an NCR
                                                              ,
- nut.oer to the DR. ; Revision 3 to CPP-010, which was released on
                                                                                  TUGCO.     In the NRC inspection cf this subject, it was' determined
,:
                '
.
                                                          '
,
                                                                                    that the ERC Supervisor, Hardware CollecWve Evaluation,
'
                                                                                    assigned a serial number on receipt-of the three part memorandum
'
                                                                                    and sent two of the copies to TUGCO. _The remaining copy is-
October 11, 1985, incorporates provisions'.for revision,.
<'
.
,
cancellation, or; invalidation of a DR.
,
No NRC. deviations were identified.
i
<
,
,
s
.
,
(4) CPP-020 (Out-of-Scope Observations)
*
'
'
t
-
. Review team'personn'el are instructed in CPP-020(to report
*
'
apparent out-of-scope observation %by three part memorandum to
,
TUGCO.
In the NRC inspection cf this subject, it was' determined
*
,
that the ERC Supervisor, Hardware CollecWve Evaluation,
'
'
assigned a serial number on receipt-of the three part memorandum
and sent two of the copies to TUGCO. _The remaining copy is-
!
!
                                                                                    filed and logged, with identification made of the record
filed and logged, with identification made of the record
;
;
                                                                                                                      4
4
i                                                       ' y.                                                           3
i
                      *
' y.
                                                . 's*                 s                                                 ,
3
                                                                            '
*
  __ _ _ _ _ _ . _ _ _ .
. 's*
s
,
'
-
-
-
- -
.
.
.
- - -
- .
- -.
.


                                                    .               ,     -                   -           . .     - -
.
    ..           -
,
                                                              '
-
    (;
-
                                          '
. .
                                              ^
- -
            ~
..
                                                                                      -8-                                         i
-
              s
'
(;
'
^
~
-8-
i
s
receiving date, date sent to TUGCO, and date of TUGC0 feedback.
'.
'.
                                                            receiving date, date sent to TUGCO, and date of TUGC0 feedback.
Six memoraida were reviewed by the NRC inspector to verify
                                                            Six memoraida were reviewed by the NRC inspector to verify
implementat, ion of this process.
          *
*
                            ,
                                                            implementat, ion of this process.
                                    '
                    '
                                                            No NRC' deviations were identified.                                    !
                        ,
                                                  (5) Inspection of ERC-QA-15 (Performance of Project Surveillance),
                                                            ER-QA-18 (Administration of Quality Assurance Auditina), and
              '
  -
                                                            ERC-QA-20 (Conduct of Programmatic Audits)
                                .                          -The ERC Project Assurance Manager was contacted in an NRC              -
          ,
                                        ~                Jinspection of these procedures. The following documents were          '
                                                        . produced:    (a) surveillance plan for QA/QC Review Team ^ dated        ,
                                                            Septeater 14,.1985; (b) surveillance status report dated
                                                      '
                                                            October 21, 1985; and (c) a' surveillance schedule.                    -
                      ig  '
                                                            The Project Assurance Manager maintains an active file and
                                                        .1 status log of surveillance reports from the planning stage until      '
                                                        M tne recommendations are implemented.        The' surveillance reports  ;
                                                            are distributed to the corporate' office, to the QA/QC Review-
,
,
                                                            Team Leader-(RTL), the Hardware Issues Supervisor, and the
'
j                                                           organization being surveyed. The reports are maintained as
No NRC' deviations were identified.
                                                            open items until'all recommendations are implemented. At that
!
                                                            time, the report files are closed and transmitted to the Records       -
'
,
(5) Inspection of ERC-QA-15 (Performance of Project Surveillance),
ER-QA-18 (Administration of Quality Assurance Auditina), and
'
-
ERC-QA-20 (Conduct of Programmatic Audits)
-The ERC Project Assurance Manager was contacted in an NRC
-
.
,
~
Jinspection of these procedures. The following documents were
'
. produced:
(a) surveillance plan for QA/QC Review Team ^ dated
,
Septeater 14,.1985; (b) surveillance status report dated
October 21, 1985; and (c) a' surveillance schedule.
'
-
ig
'
The Project Assurance Manager maintains an active file and
.1 status log of surveillance reports from the planning stage until
'
M tne recommendations are implemented.
The' surveillance reports
;
are distributed to the corporate' office, to the QA/QC Review-
Team Leader-(RTL), the Hardware Issues Supervisor, and the
,
j
organization being surveyed.
The reports are maintained as
open items until'all recommendations are implemented.
At that
time, the report files are closed and transmitted to the Records
-
i
i
                                                            Ada;inistrator.
Ada;inistrator.
                                                            Ttn NRC inspector reviewed four surveillance reports of which
Ttn NRC inspector reviewed four surveillance reports of which
                                                            three were closed (no deficient items) and one was still open
three were closed (no deficient items) and one was still open
                                                            with one deficiency being processed. Each report file contained       .
with one deficiency being processed.
                                                            a three part memo to the QA/QC RTL, a surveillance checklist           ,
Each report file contained
        ,
.
                                                            report, and K surveillance checklist.
a three part memo to the QA/QC RTL, a surveillance checklist
    2~
,
                                                                  ,-
report, and K surveillance checklist.
                                                                                                                                  ;
,
                  ,
2
                                                            No NRC deviations were identified.                                     ;
,-
                                                                                                                                  '
;
                                                            The NRC reviewed the first quarterly corporate audit of the CPRT
~
                                                            activities.   The audit was performed September 23 through 26,
No NRC deviations were identified.
                                                            1985, and the report was issued October 15, 1985. This
;
                                                            corpcrate audit identifisd one deficiency. A response to the
,
                                                            audit was issued on October 21,.1985, providing                     -
The NRC reviewed the first quarterly corporate audit of the CPRT
                                                                                                                                    '
'
                                                            corrective / preventive actions. The second quarterly audit is         '
activities.
,c             -
The audit was performed September 23 through 26,
                                                            being planned at this time, but a specific date has not been
1985, and the report was issued October 15, 1985.
                r                                           set,
This
    ly v
corpcrate audit identifisd one deficiency.
                                                                                                                                  *
A response to the
          '
audit was issued on October 21,.1985, providing
                                                    '
'
                                                            No NRC deviations were identified.
-
                                        b.       TERA Procedures and Instructions
corrective / preventive actions. The second quarterly audit is
  ,
'
                            ~'
,c
                                                  TERA has issued 16 of the 19 planned design adequacy procedures
-
                                  ..
being planned at this time, but a specific date has not been
                                                  (0APs).       Review of these procedures indicates'that six apply, in
r
    ,                 ,\
set,
                                            ~
ly v
                              t:
*
                            .\. :
'
                      '
'
                                            .
No NRC deviations were identified.
                                                                                                                                    ,
b.
                                      ,
TERA Procedures and Instructions
                                                '                                                  b a
TERA has issued 16 of the 19 planned design adequacy procedures
                g                                                                                               W
,
~'
(0APs).
Review of these procedures indicates'that six apply, in
..
,\\
,
~
t:
.\\. :
'
.
,
'
,
b
a
g
W
- --
. .


                        v.
if f.,
fi#f.,                                                  . w a p y; j,- y9 .                                                 '
v.
                                                                                                                                      .                     .' ' '
. w a p y; j,- y9 .
                                                                                                                                                                                        ,                .
.
                                                                                                                                                                                                          '                                                              ,
.
            y L;g * i lR , f ':.]                                                       ,                          t,                   .
,
                                                                                                                                                                                                              '
.
                                                                                                                                                                                                                      'A'                         'r -
'
                                                                                                                                            *<
' ' '
                                                                                                                                                    ,
'
                                                                                                                                                                                          **
,
  73 , ;Q r j             w                                                                             ''      ~-'             ' '                                                                             *
# y L;g * i lR , f ':.]
                                                              '           ,                                                                                                                                                , . -                     .                       ,
t,
                                                                          x.             . .                                                    ',
'
                                                                                                                                                                        .,            ,
'A'
                                                                                                                                                                                              n'                     '
'r -
                                                                                                                                                                                                                                              ,
,
                                                                                                                                                                                                                                                    c' >
''
                                                                                                                                                                                                                                                            -
.
  h k.K M*-LM-
,
        p. c                      _yo,                 ;;                      ,.
73 , ;Q r j
                                                                                                    ,
w
                                                                                                          +
~-'
                                                                                                                    r                   1
' '
                                                                                                                                                  L
*<
                                                                                                                                                    .x                        *
**
                                                                                                                                                                                *
*
                                                                                                                                                                                        ' t' -
n'
                                                                                                                                                                                                    '!                                          '
'
      yc                                                                        J'
, . -
                                                                                                .-                                    ~                                      , ,
.
                                                                                                                                        *
,
  [T+f:[-3;~                                                   . Qg , (                                                          "                                                                                                  '
'
                              ,
x.
                                                                                                                                                                    .,               ,9- ;                                     ,
h k.K M*-LM-
                                                                                                                                                                                                                                                                                        '
1
      , , ,                                     p m.       '"
.x
                                                                            ,
' t'
                                                                                                                                      ,              ;                       .; y
'!
                  ,
,
                                          }' '                                                                                                       4"               ,,
c' >
                                                                                                                                                                                                j
-
  [                     jd                                       N               .          tw6cleorpart,toi.heilShPsdefininhTERAonsiteactivity                                                                                                 .I.   L
,
                                    '; '                                                         (civil-structural,' mechanical, and silscellaneous); :These ?.re DAP-2,
. .
            ,
.,
              M' A ' s u                                      -
,
                                                                                              J" Documentation and Tracking of' Issues &nd Discrepancies"; DAP-14,
',
                                                                                                                                                                                                                                                                '
*
  f, f            e                                                                              "DesignLAdequacy Program ~ Records"; DAP-15, " Training and
'
                                                                                                                                                                                                                                                                                .
,
                                                                                                                                                                                                                                                                                '
r
                                                                                                Qualification"; DAP-16,." Audits"; DAP-17, " Corrective Actions"; and
-
                                    '
+
                            .
L
  ,
*
                                '
p. c
                                                                                              'DAP-19, " Processing and Review.of Information'Between Quality of
_yo,
                                                                                              -
;;
  @". D.. ;, %,,'
,.J'
    ,
[T+f:[-3;~ . Qg ,
                    .
yc
                                .-
.-
                                                            _
~
                                                                                                . Constructions.QA/QC Adequacy Program and Design; Adequacy Program."'
, ,
                    4                             - .                               J
*
                                A,                                                               DAP-14'and DAP-15 were. audited by the NRC inspector'and found to
'
  %yp
"
  N                                      m                                       '
(
                                                                                                  comply with,the applicable CPRT Policies and Guidelines.
,9- ;
                L                     '                                                                   '
'
  ,      ;                                                                                                             .                                                                        .
,
                                                                                                                                                                                                                        ~
,
    +                  '
.,
    ''d
m.
                                                                                                  The NRC has inspected the implementation ,in this area and the results
, , ,
                      '
p
                                                                                                  of implementation:of UAP-2 is reported in NRC Inspection Report
;
i,.
.; y
                                                                                                .No. 50-445/85-13; 50-446/85-09.
,
              ,.                                                   .                                                                                     &               ,
,
                                                      ,                                                                               ,
'"
        '
}' '
                "
4"
                                                      <                        %            TDAP-16 and.DAP-17'are applicable to the onsite TERA effort; however,:
,,
    p                             *
j
                                                                                              ithese~ procedures are implemented by offsite personnel' reporting to
,
  ''',                               .                                                        .the Design Adequacy Program Quality' Assurance Manager. 'This offsite
[
                                          '                          <
jd
                                                                                                  TERA'activityJis being inspected. and reported by the NRC Office of
N
R                                        .                  .
tw6cleorpart,toi.heilShPsdefininhTERAonsiteactivity
                                                                                                . Inspection'and Enforcement.                                                                                   ~
.I.
                                                                                                                                                                                                                              '
'; '
      7,
L
                '
.
                        wg                                                      -
M' A ' s u
                                                    '
(civil-structural,' mechanical, and silscellaneous); :These ?.re DAP-2,
                                                                            ,
f, f
                                                                            #.                    DAP-19 applies to the information: interfaces between the Design
J" Documentation and Tracking of' Issues &nd Discrepancies"; DAP-14,
      -                                                            .
'
                                                                                                Adequacy Program and ERC Qual _ity of Construction and QA/QC Adequacy                                                                                                                   i
-
                            ',                                                                   Program groups. This DAP was audited by the NRC inspector in
,
    . ,*                                                                               -                                                                                                                                                                                            H
"DesignLAdequacy Program ~ Records"; DAP-15, " Training and
    ;;            ,',               .          il                                               conjunction with the implementation audit oftERC-Procedure CPP-018,
.
                                    #                                                                                                                                                                                               '
'
e
'
Qualification"; DAP-16,." Audits"; DAP-17, " Corrective Actions"; and
.
,
@ D.
'DAP-19, " Processing and Review.of Information'Between Quality of
'
-
".
%,,'
. Constructions.QA/QC Adequacy Program and Design; Adequacy Program."'
.-. ;,
_
,
.
4
- .
J
%yp
A,
DAP-14'and DAP-15 were. audited by the NRC inspector'and found to
N
m
comply with,the applicable CPRT Policies and Guidelines.
'
L
'
'
~
;
,
'
.
.
The NRC has inspected the implementation ,in this area and the results
+
''d
of implementation:of UAP-2 is reported in NRC Inspection Report
'
.No. 50-445/85-13; 50-446/85-09.
i,.
.
&
,
,.
,
,
'
TDAP-16 and.DAP-17'are applicable to the onsite TERA effort; however,:
%
"
<
p
ithese~ procedures are implemented by offsite personnel' reporting to
*
' ' ' ,
.the Design Adequacy Program Quality' Assurance Manager. 'This offsite
.
TERA'activityJis being inspected. and reported by the NRC Office of
'
<
. Inspection'and Enforcement.
~
'
R
.
.
7,
wg
-
,
DAP-19 applies to the information: interfaces between the Design
'
'
#.
Adequacy Program and ERC Qual _ity of Construction and QA/QC Adequacy
-
.
i
',
Program groups. This DAP was audited by the NRC inspector in
H
. ,*
,',
il
conjunction with the implementation audit oftERC-Procedure CPP-018,
-
; ;
.
#
L
L
                "
3.
                  3.                                                                   . as; described in paragraph 5.a.(5)'above.
. as; described in paragraph 5.a.(5)'above.
'
"
." 'No NRC' deviations were identified.
}
s
s
r                                         ,                         ,         ." 'No NRC' deviations were identified.                                                                                                                                                                }
r
                                          u                                                                                                                                                                                                                                         r
,
                                                                        - ,
,
                                        1                                'c.                     Implementation of CPRT Policies and Guidelines
r
L,.                                                               '
u
                                                                          ;                                       '
- ,
                                                                                                                                                                                                                                  '
'c.
                                                                                            "
Implementation of CPRT Policies and Guidelines
      'jN                                        'O                      ,-
1
                                                                                                ..(1). Electrical Issues: .The electrical issues in the ISAPs are the
L,.
                                                                                                                                                                                                                                        .
'
(.a                                               1,.,                                         0                     responsibility of'one RTL.                                               The CPRT Policies and Guidelines
;
Mr,,4                                                               <;/,                                   .h establish the methods for accomplishing'these tasks.
..(1). Electrical Issues: .The electrical issues in the ISAPs are the
, , ,        Q                             Lfs,                                                       _14 -
'
?. i p2'''                                                         ''
'
                                                                          .-
'jN
                                                                                                            '1 he     T purpose _'                   o f the NRC inspection pas to determine if the                                                         1-
'O
                                                                                                                  .gprocessi'ng of the electrical issues complied with,the
.
                                                                                                                                                                                                                                                                  "
"
Q,'M'
,-
N ' rf h . ll ,                                                                ''l*                        -        requirements set by the CPRT Policies and Guidelines. The,
(.a
                                                                                                                                                                                                                                                                    t
1,.,
                                                                                                                                                                                                                                                                                  -
0
                                                                                                                                                                                                                                                                                    ,
responsibility of'one RTL.
L % ..                                            '                              '
The CPRT Policies and Guidelines
                                                                                                  .
Mr,,4
                                                                                                              '
<;/,
                                                                                                                      inspection covered.four of the guidelines; i.e., (a)' central and
.h establish the methods for accomplishing'these tasks.
                                                                                                                                                                                                                                                                .      .            .
Q
            . "$f                               _
Lfs,
                                                      ^
_14 -
                                                                            '
, , ,
                                                                                                            -        working' files, (b)~ safety significance evaluations :(SSEc),
?. i p2'''
gg ^ ''.,6o' '.             e
''
                                                                                              "t                   f(c). developing campling plans and random samples for TRT, issues,                                                                               ~
'1 he purpose _' f the NRC inspection pas to determine if the
                                                                                                                                                                                                                                                                            ,
1-
                                                                                                                                                                                                                                                                                  7
T
o
.-
Q,'M' h . ll ,
l*
.gprocessi'ng of the electrical issues complied with,the
"
t
-
N ' rf
requirements set by the CPRT Policies and Guidelines.
The,
.
.
.
''
,
-
L % ..
inspection covered.four of the guidelines; i.e., (a)' central and
'
'
'
.
. "$f
_
-
working' files, (b)~ safety significance evaluations :(SSEc),
^
'
gg ^ ''. o' '.
"t
f(c). developing campling plans and random samples for TRT, issues,
,
~
7
,6
'?
. #and-(d) policy on testing and inspection personnel used'in third <
:,2 -
:,2 -
                      3                                                                                     . #and-(d) policy on testing and inspection personnel used'in third <
e
    '?                                                                                                                perty verification activities. This report completes the NRC's '
3
                                                                                                                                                                                                                                                                                      ,
perty verification activities.
l _.                                              .;                                                                 initial inspection'of programmatic implementations in the area of'                                                                                 ~
This report completes the NRC's '
                                                  -q m
.;
                                                                                                                ,
initial inspection'of programmatic implementation in the area of'
.<u                                                                              -h ,.                                electrical' issues;,                                                                         ~
,
V 'i /                                     yQ y                                                       .       P
l _.
                                        x wa,
-q m
                                                                                                                                                                                                      '
-h
I                                                                                  J+
electrical' issues;,
                                        *
~
        f       A                                                                       3                                                             .-
s
                                        63e's                                                                                                                                                           g
~
                                                                                                                                                                                                                          ]
,
, I: :                                   e                                                                                                                             .?                                       .k
.<u
,.
V 'i /
yQ y
P
.
x wa,
I
J+
'
f
A
*
3
.-
63e's
g
]
, I: :
e
,
.?
.k
E. g.
E. g.
                                                                                                                                          ,
-
                                                                                                                                          -
.
                                                                                                                                    ,                                   .
,
          '
'
                                                                                                y'.                                                                       '
y'.
        <
'
                        ,
,
                                                ,n.,
i
                                                                                                  ,
4
                                                                                                                            i
<
                                                                                                                                      ,      ,.     .                                                                                     ;
,n.
                                                                                                                                                                                                                                                          4
,
                                                                                                                                              '
,
              6                                                         e ,
,.
                                                                                                                              ~
.
                                                                                                                                                                ,                        s
;
                                                                                                                                                                                                                                          Us
,
                                              ,,*I,vp                                 *
Us
                                                                                            ,
~
                                                                                                  '$ , _                                                 ,,
'
                                                                                                                                                                                            ~
6
                                                                                                                                                                                                          ~7
e
                                                                [                 I #               *
,
                            ~ ,., ,i)                                          c -                                       .                                 .                   ,                         ,
,
s
,,*I,vp
'$ , _
,,
*
~
~ 7
,
~ , i)
[
I #
*
c -
.
.
., ,
,
,
f
's
6
' "
S
_mt
-
-
.'
'
, ._
, ._
                          f                  's          6
,
                                                              ,
,
                                                                          _mt                      -
                                                                                                            ' "
                                                                                                                  -
                                                                                                                                S
                                                                                                                                                                            .'                                                              '
                                                                                                                                                                                                                                                              ,


J,,.               .
J,,.
                    .                                                                               ,
.
        .
.
,
.
.
.
                  \
\\
    ~
-10-
                    -           '
<
                                                          -10-                                      <
~
                x
-
  !           ,
'
                              (a) Working Files: ,The working files system and subject matter
x
                                      breakdown being used is as described in the CPRT
!
  g
(a) Working Files: ,The working files system and subject matter
                                '
,
                                    -guidelines. A file index_is available for each ISAP which
breakdown being used is as described in the CPRT
j                                     defines the contents of each file folder. A computer based
g
  O                                   data system is being established for these files. Two'
-guidelines. A file index_is available for each ISAP which
      ,
'
                                      files were che'ck'd
j
                                                        e for compliance with the CPRT Policies
defines the contents of each file folder.
                                      and Guidelines.
A computer based
                                    . No NRC deviations were identified.
O
                                                      '
data system is being established for these files.
                                                        '
Two'
                                                  .,
files were che'ck'd for compliance with the CPRT Policies
                '
e
                              (b) SSE: -The NRC inspector reviewed the. processing of ISAP
,
                                      No. I b.1 that resulted in one item which will require a
and Guidelines.
                                      SSE. 'This'SSE'will be. included in the review process for
. No NRC deviations were identified.
                                      all-SSEs generated by the CPRT     e
'
                                      No NRC deviations were identified.
'
          ~
.,
                              (c) ' Sampling Plan: The sampling plan used on ISAP No. I.a.1
(b) SSE: -The NRC inspector reviewed the. processing of ISAP
          T-                         was reviewed by the NRC inspector. It complied with the
'
                                      guidelines and was well; documented. Inspection confirmed
No. I b.1 that resulted in one item which will require a
                                      that the information on the random sampling selection was
SSE. 'This'SSE'will be. included in the review process for
                                      turned over to ERC, who prepared the inspection packages,
all-SSEs generated by the CPRT
                                      performed the inspections, wrote inspection, reports (irs)
e
                                      for satisfactory and unsatisfactory conditions, and after
No NRC deviations were identified.
    '
~
                                      checking and signoff by two levels of supervision transmitted
(c) ' Sampling Plan:
                                      the irs to the electrical issues RTL.
The sampling plan used on ISAP No. I.a.1
                                    .The RTL sent unsatisfactory irs to TUGCO, who evaluated the
T-
                                      irs and sent a memorandum back detailing the disposition of
was reviewed by the NRC inspector.
                                      each IR.   NCRs were written by TUGC0 on those where
It complied with the
                                      discrepancies existed. Memoranda were sent explaining why
guidelines and was well; documented.
                                      each of the remainder were not considered as discrepancies.
Inspection confirmed
                                      The NRC inspector also reviewed implementation of the
that the information on the random sampling selection was
                                      random sampling system used for ISAP Nos. I.a.2 and I.a.3.
turned over to ERC, who prepared the inspection packages,
                          -
performed the inspections, wrote inspection, reports (irs)
                                      No NRC deviations were identified.
for satisfactory and unsatisfactory conditions, and after
                            -(d) Personnel Requirements:       Qualification requirements for
checking and signoff by two levels of supervision transmitted
                                      RTLs and issue coordinators are defined in Section VII of
'
                                    .the CPRT Program Plan, "CPRT Objectivity Guidance." The           ,
the irs to the electrical issues RTL.
                                      primary requirements are: (1) experience and knowledge in         '
.The RTL sent unsatisfactory irs to TUGCO, who evaluated the
                                      the review subject matter, (ii) experience in managing           1
irs and sent a memorandum back detailing the disposition of
                                      technical projects and reviews, and (iii) integrity and
each IR.
                                      objectivity based on lack of previous involvement in the
NCRs were written by TUGC0 on those where
                                      CPSES project activities.
discrepancies existed.
  l
Memoranda were sent explaining why
                        >
each of the remainder were not considered as discrepancies.
                      o
The NRC inspector also reviewed implementation of the
                                                                                                        l
random sampling system used for ISAP Nos. I.a.2 and I.a.3.
-
No NRC deviations were identified.
-(d) Personnel Requirements:
Qualification requirements for
RTLs and issue coordinators are defined in Section VII of
.the CPRT Program Plan, "CPRT Objectivity Guidance." The
,
primary requirements are:
(1) experience and knowledge in
'
the review subject matter, (ii) experience in managing
technical projects and reviews, and (iii) integrity and
objectivity based on lack of previous involvement in the
CPSES project activities.
l
>
o


          -            =
r :-.. a ...
    r, :-.. a ...
-
                                        ,
=
                                                          g
,
      a     .s '                                                                                                       5
,
                      r >
g
                                                                                                                    .
5
      '
a
                                                                          11-
.s '
                        -                             The resumes and signed objectivity statements for the
r >
                                                      principal individuals involved in the electrical ~ issues
.
                                                      were: reviewed.
'
                                                      No NRC deviations were identified.
11-
                                            (2)-Testing' Issues: The purpose of the NRC inspection was to
-
                                                  determine if the disposition of testing concerns complied with
The resumes and signed objectivity statements for the
                                                  the CPRT, Policies and Guidelines.   The four guidelines discussed
principal individuals involved in the electrical ~ issues
                            "
were: reviewed.
                                                  in paragraph 5.c.(1) above were used to perform this inspection.
No NRC deviations were identified.
                                                  This report; completes the NRC's initial inspection of
(2)-Testing' Issues: The purpose of the NRC inspection was to
                                                  programmatic implementation in this area.
determine if the disposition of testing concerns complied with
                                                                ~
the CPRT, Policies and Guidelines.
                                                  (a) Working Files:   The file system and subject matter
The four guidelines discussed
                                                      breakdown in,use were reviewed.   A file index was available
"
                                                      for each ISAP which defined the contents of the file
in paragraph 5.c.(1) above were used to perform this inspection.
  ,.
This report; completes the NRC's initial inspection of
                                                      folder. The file index was checked against the contents of
programmatic implementation in this area.
  l                                                   the file for these files.
~
                                                      No NRC deviations were identified.
(a) Working Files:
                                                  (b) SSE: One DR has been written and an SSE completed.       The
The file system and subject matter
                                                      NRC inspector reviewed the processing of this DR.
breakdown in,use were reviewed.
  ,
A file index was available
  -
for each ISAP which defined the contents of the file
                                      -
folder.
                                                      No NRC deviation: were identified.
The file index was checked against the contents of
                                                  (c) Sampling Plan:   The sampling plan described in the program
,.
                                                      plan was not found to be feasible,.so an alternate plan was
l
                                                      ~ developed. This revised plan was described in an appendix-
the file for these files.
                                                      to the results report. This pract1ce is permitted by
No NRC deviations were identified.
                                -
(b) SSE: One DR has been written and an SSE completed.
                                                      Appendix D of the CPRT Program Plan.
The
                                                      No-NRC deviations were identified during a review of the
NRC inspector reviewed the processing of this DR.
  ,,
-,
                                                      original and revised sampling plans.
-
                                                  (d) Personnel Requirements: The resumes and signed objectivity
No NRC deviation: were identified.
                                                      statements for the RTL and each of the three issue
(c) Sampling Plan:
                      ,
The sampling plan described in the program
                                                      coordinators were reviewed.                                     ,
plan was not found to be feasible,.so an alternate plan was
                              "
~ developed. This revised plan was described in an appendix-
                                                      No additional NRC deviations to that noted in NRC
to the results report. This pract1ce is permitted by
                                                        Inspection Report No. 50-445/85-11, 50-446/AS-06 were
-
      :    '
Appendix D of the CPRT Program Plan.
                                          '
No-NRC deviations were identified during a review of the
                                                        identified.
original and revised sampling plans.
                          ..                                                                                            \
,,
                              -                                                                                          ,
(d) Personnel Requirements: The resumes and signed objectivity
                4 '
statements for the RTL and each of the three issue
                                                                                                                        .
coordinators were reviewed.
                    -
,
              .        t -
,
                                                                                                                        l
"
                                                                                                                        l
No additional NRC deviations to that noted in NRC
                                                                                                                        l
Inspection Report No. 50-445/85-11, 50-446/AS-06 were
                                                                                                                        I
identified.
                                  e-
                                  6
                                    +
'
'
:
'
. .
\\
-
,
4 '
.
.
t
-
-
e-
6
+
'
- - - - .
. .
. . . - - - -
,__
.
. - . .
-
-
.
- - -
- . -
-
- - . .
.
- - - - . -
-
-


  -                                                                                                           _
-
                                                                                                                          .
_
      8 -
.
    ,.
8
                                                  -12-
,.
          6.   CPRT ISAPs (Excluding ISAP No. VII.c)
-
                a. Inspection Reports on Butt Splices (ISAP No. I.a.2) and Butt Splice
-12-
                  Qualification (ISAP No. I.a.3)
6.
                    Status of CPRT Activity
CPRT ISAPs (Excluding ISAP No. VII.c)
                    Phase II of ISAP No. I.a.2 has been completed with the following
a.
                    findings:
Inspection Reports on Butt Splices (ISAP No. I.a.2) and Butt Splice
                    (1) No undocumented butt splices were identified during the
Qualification (ISAP No. I.a.3)
Status of CPRT Activity
Phase II of ISAP No. I.a.2 has been completed with the following
findings:
(1) No undocumented butt splices were identified during the
inspection of 38 cabinets which were supposed to be free of
,
,
                          inspection of 38 cabinets which were supposed to be free of
splices;
                          splices;
(2) A total of 603 butt splices were identified during the
                    (2) A total of 603 butt splices were identified during the
inspection of 26 cabinets and 25 motor control centers, which
                          inspection of 26 cabinets and 25 motor control centers, which
from documentation were supposed to contain 648 splices.
                          from documentation were supposed to contain 648 splices. This
This
                          difference resulted because 149 of the documented splices were
difference resulted because 149 of the documented splices were
                          not installed, but 104 undocumented splices were discovered;
not installed, but 104 undocumented splices were discovered;
                    (3) A total of 168 of the above 603 butt splices were found to be
(3) A total of 168 of the above 603 butt splices were found to be
                          unsatisfactory, either by physical inspection or as a result of
unsatisfactory, either by physical inspection or as a result of
                          being undocumented;
being undocumented;
                    (4) A total of 80 unsatisfactory butt splices were removed for
(4) A total of 80 unsatisfactory butt splices were removed for
                          testing and replaced; and
testing and replaced; and
(5) A review was performed of 341 irs which were applicable to 286
'
'
                    (5) A review was performed of 341 irs which were applicable to 286
butt spliced cables. This review identified deficiencies in 294
                          butt spliced cables. This review identified deficiencies in 294
irs; e.g., failure to identify which conductors were spliced,
                          irs; e.g., failure to identify which conductors were spliced,
and after the fact verification of a splice rather than the
                          and after the fact verification of a splice rather than the
required witness.
                          required witness. In addition to finding some unacceptable
In addition to finding some unacceptable
                          splices during the Phase II inspections, some splices documented
splices during the Phase II inspections, some splices documented
                          in records were found to not be installed.   TUGC0 submitted a
in records were found to not be installed.
                          report in accordance with 10 CFR Part 50.55(e) dated
TUGC0 submitted a
                          September 26, 1985, concerning the identified deficiencies.                 An
report in accordance with 10 CFR Part 50.55(e) dated
                          interim Corrective Action Report, CAR-050, has been issued.
September 26, 1985, concerning the identified deficiencies.
                    Status of NRC Inspection Activity
An
                    The NRC inspector is continuing to review CPRT ISAP Nos.l.a.2,
interim Corrective Action Report, CAR-050, has been issued.
                    Revision 3;-I.a.3, Revision 3; and CPRT Quality Instruction (QI)
Status of NRC Inspection Activity
                    QI-002, Revision 4.
The NRC inspector is continuing to review CPRT ISAP Nos.l.a.2,
              "
Revision 3;-I.a.3, Revision 3; and CPRT Quality Instruction (QI)
                    No NRC violations or deviations were identified.
QI-002, Revision 4.
                b. Electrical Conduit Supports (ISAP No. I.c)
"
                    Status of CPRT Activity
No NRC violations or deviations were identified.
                    TUGC0 has completed an engineering cher:k of as-built drawings for 257
b.
                    1 1/2-inch and 2-inch conduit runs in the combined random and
Electrical Conduit Supports (ISAP No. I.c)
Status of CPRT Activity
TUGC0 has completed an engineering cher:k of as-built drawings for 257
1 1/2-inch and 2-inch conduit runs in the combined random and
.
.
                                                                                  ___.-____.____________.___---_________J
.-
.
.
---
J


  _ __.                         ._ . .
_ __.
                                                                        .
._ . .
                                                                              ,.
.
    7               ..
,.
                    "
7
                                          ..
. .
                        .
"
                                                                              -13-
.
        -                                        engineered' samples; i.e., 126 random and 131 engineered.   These-
..
'-                                             drawings have been transmitted to TERA for third party review and to
-13-
                                                G&H for seismic analysis. Seismic analysis has been completed for
engineered' samples; i.e., 126 random and 131 engineered.
        -                     .                 all runs in the random sample and for 128 runs in the engineered
These-
!                                               sample.   Fifteen conduit runs have been identified, to date, as
-
drawings have been transmitted to TERA for third party review and to
'-
G&H for seismic analysis.
Seismic analysis has been completed for
-
.
all runs in the random sample and for 128 runs in the engineered
!
sample.
Fifteen conduit runs have been identified, to date, as
'having the potential for interaction with safety related components.
' c-
' c-
                  +
+
                                                'having the potential for interaction with safety related components.
TUGC0 has initiated a dynamic test program at Corporate Consulting
,                                                TUGC0 has initiated a dynamic test program at Corporate Consulting
,
'
' .and Development (CCL) in North Carolina.
The dynamic testing will
r
provide actual strengths as compared to the previously used predicted
.;
values. TUGC0 will also conduct a damage study walkdown of all
'
conduit runs currently determined to have potential interactions with
'
'
r                                            ' .and Development (CCL) in North Carolina. The dynamic testing will
l
          .;
safety-related components.
                                                provide actual strengths as compared to the previously used predicted
Evaluation of potential interactions for
          '
safety significance will utilizo preestablished criteria to be
                                                values. TUGC0 will also conduct a damage study walkdown of all
specified in a walkdown procedure.
                                                conduit runs currently determined to have potential interactions with
This procedure is currently being
                              '
prepared by Ebasco.
l                                                safety-related components. Evaluation of potential interactions for
Third party review of the Unit 1 damage study resolution for greater
                                                safety significance will utilizo preestablished criteria to be
'
                                                specified in a walkdown procedure.     This procedure is currently being
<
                                                prepared by Ebasco.
than 2-inch conduit in Train C is being addressed in ISAP.No. II.d.
        <
.
                          '
Status of NRC Inspection Activity
                                                Third party review of the Unit 1 damage study resolution for greater
A. preliminary review of the Unit 1 large conduit damage study
                                                than 2-inch conduit in Train C is being addressed in ISAP.No. II.d.
procedure and related as-built drawings has been conducted.
                                                                                                                .
Resolution of interactions predicted in this study will be reviewed
                                                Status of NRC Inspection Activity
as part of the NRC inspection program for ISAP No. II.d.
                                                A. preliminary review of the Unit 1 large conduit damage study
A review of
                                                procedure and related as-built drawings has been conducted.
the CCL test procedure has been conducted.
                                                Resolution of interactions predicted in this study will be reviewed
,
                                                as part of the NRC inspection program for ISAP No. II.d. A review of
No NRC violations or deviations were identified.
                                                the CCL test procedure has been conducted.
_C Inspector Qualifications (ISAP No. I.d.1)
                            ,
Q
                                                No NRC violations or deviations were identified.
c.
                                        c.      _C
Status of CPRT Activity
                                                Q    Inspector Qualifications (ISAP No. I.d.1)
Phase II evaluation of ASME inspector qualifications has not been
                                                Status of CPRT Activity
completed.
                                                Phase II evaluation of ASME inspector qualifications has not been
Status of non-ASME inspector qualifications was sent to
                                                completed. Status of non-ASME inspector qualifications was sent to
the TUGC0 QC Manager by ERC Letter QA/QC-RT-681 on October 4,1985.
                                                the TUGC0 QC Manager by ERC Letter QA/QC-RT-681 on October 4,1985.
Further review by the Special Evaluation Team (SET) has resulted in
                                                Further review by the Special Evaluation Team (SET) has resulted in
some changes to the original' transmittal.
                                                some changes to the original' transmittal. Reinspection is underway
Reinspection is underway
                                                for a seventh inspector p10ced into Phase III.     Package preparation
for a seventh inspector p10ced into Phase III.
                                                is complete for an eighth i.1spector.                                     ,
Package preparation
                                                                                                                            l
is complete for an eighth i.1spector.
                                                Status of NRM spection Activity                                           )
,
                                                                                                                            l
Status of NRM spection Activity
                                                During this reporri tg period, the NRC inspector witnessed 24             l
)
                                                Phase III reinspections cu ducted by ERC inspectors and also               l
During this reporri tg period, the NRC inspector witnessed 24
                              ,                  performed 10 reinspections independent of ERC personnel.     No           l
Phase III reinspections cu ducted by ERC inspectors and also
                                                deficiencies were identified in these.reinspections by either ERC         l
performed 10 reinspections independent of ERC personnel.
                                                inspectors or the NRC inspector.
No
                                                                                                                      ,
,
                                                                                                                    6
deficiencies were identified in these.reinspections by either ERC
                                                                                                                          -
inspectors or the NRC inspector.
            'T
,
              1%
6
-
'T
1%
-
- - -
, . _ _
.
-


  *
*
.
.
                                    -14-
-14-
      A concern that the reinspection attributes were very basic in nature
A concern that the reinspection attributes were very basic in nature
      and may not have accurately reflected the work performed originally
and may not have accurately reflected the work performed originally
      by the project inspector was reviewed with the issue coordinator.
by the project inspector was reviewed with the issue coordinator.
      This review found that the reinspection did reflect the activity
This review found that the reinspection did reflect the activity
      associated with the inspector's earlier certifications.
associated with the inspector's earlier certifications.
      No NRC violations or deviations were identified.
No NRC violations or deviations were identified.
    d. Guidelines for Administration of QC Inspector Tests (ISAP No. I.d.2)
d.
      Status of CPRT Activity
Guidelines for Administration of QC Inspector Tests (ISAP No. I.d.2)
      The SET has completed review of prior revisions to TUGC0 Procedure
Status of CPRT Activity
      CP-QP-2.1, " Training of Inspector Person el." Comments from their
The SET has completed review of prior revisions to TUGC0 Procedure
      review have been given to the QA/QC RTL and presented to TUGC0 for
CP-QP-2.1, " Training of Inspector Person el."
      resolution and/or incorporation into CP-QP-2.1. Revision 19 to
Comments from their
      CP-QP-2.1 was issued October 4, 1985, and incorporates these
review have been given to the QA/QC RTL and presented to TUGC0 for
      comments.   Inspector cercification examinations have also been
resolution and/or incorporation into CP-QP-2.1. Revision 19 to
      revised to meet the requirements of Revision 19 of CP-QP-2.1.
CP-QP-2.1 was issued October 4, 1985, and incorporates these
      Review of B&R Procedure ECP-19, " Exposed Conduit / Junction Box and
comments.
      Hanger Fabrication and Installation," and other procedures affecting
Inspector cercification examinations have also been
      craft training will be conducted under ISAP No. I.d.3. This issue
revised to meet the requirements of Revision 19 of CP-QP-2.1.
      was previously included in ISAP No. I.o.2.
Review of B&R Procedure ECP-19, " Exposed Conduit / Junction Box and
      Status of NRC Inspection Activity
Hanger Fabrication and Installation," and other procedures affecting
      The NRC inspector reviewed Procedure CP-QP-2.1, Revisions 18 and 19,
craft training will be conducted under ISAP No. I.d.3.
      to determine if concerns of the NRC Technical Review Team (TRT) were
This issue
      satisfactorily addressed. Revision 19 of CP-QP-2.1 was found to
was previously included in ISAP No. I.o.2.
      address the TRT concerns noted in ISAP No. I.d.2, including inspector
Status of NRC Inspection Activity
      familiarization or training for changes in QC inspection procedures.
The NRC inspector reviewed Procedure CP-QP-2.1, Revisions 18 and 19,
      This action closes open item 445/8513-0-06.
to determine if concerns of the NRC Technical Review Team (TRT) were
      The NRC inspector reviewed five recently administered QC inspector
satisfactorily addressed.
      examinations. These were found to comply with the requirements of
Revision 19 of CP-QP-2.1 was found to
      CP-QP-2.1 for written examinations.
address the TRT concerns noted in ISAP No. I.d.2, including inspector
      No NRC violations or deviations were identified.
familiarization or training for changes in QC inspection procedures.
    e. Inspection for Certain Types of Skewed Welds in NF Supports
This action closes open item 445/8513-0-06.
      (ISAP No. V.a)                                                                 >
The NRC inspector reviewed five recently administered QC inspector
      Status of CPRT Activity
examinations.
      Reinspection of the random sample of 60 ASME Section III, Subsection
These were found to comply with the requirements of
      NF pipe supports containing 99 type 2. skewed welds has been
CP-QP-2.1 for written examinations.
      completed. Disposition of the 12 TUGC0 NCRs associated with the
No NRC violations or deviations were identified.
      undersize type 2 skewed field welds has not been made.
e.
                                                                            _ - _ _ _
Inspection for Certain Types of Skewed Welds in NF Supports
(ISAP No. V.a)
>
Status of CPRT Activity
Reinspection of the random sample of 60 ASME Section III, Subsection
NF pipe supports containing 99 type 2. skewed welds has been
completed.
Disposition of the 12 TUGC0 NCRs associated with the
undersize type 2 skewed field welds has not been made.
-


                                                                                                                                                                    ~
g ,4
  g ,4
N ;, l
                                                                                                                                                      '
^
                                                                                                                                      f }.
f }.
                                                                                                              ^
~
                                          N ;, l                                                                       ,
'
                        .                                                                                                                    ,
,
    "
,
                                                                                                ,
.
                                                                                                                .
. 3
                                                                                                                *
,
                                                                                                                  3
"
                                                                ?                                          ,
*
                . .,                                      .                .                                                                              .
. .,
                                                                                        <
.
          % -                          m              y .                                .
?
                                                                                                                                                    ,,
.
                                                                                                                      '
,
                    T
.
                          a                      1                              }
% -
                                                                                                                                                              ,
y .
                                                                                              '
  '
                                          o.           :.            ;                                            [ -15-
                                                                                                                                ~
                a                                            '
                                                                                  Status of NRC Inspection Activity
                                                                                                                                                                              ,
                                                                                  The NRC' inspector. witnessed'a total.of nine reinspections and
                                                                                  performed three independent inspections of NF supports containing
                            .
                                                                                  type _2 skewed welds. -The< results 'of NRC Region I inspections of
                                                                                  skewed welds are documented in NRC Inspection Report ~
                            '
                                                                                  No. 50-445/85-13; 50-446/85-09. The planned NRC physical inspections
        --
                            ,       3
                                                                                  for this ISAP have now'been completed. NRC evaluation of TUGCO's
                                                                                ~ dispositions of 12 undersize type 2Lskewed field ~ welds is dependent
  -
          ^
                                            ,
                                                                                  upon the processing of;the associated NCRs. This remains an open                    '
                                                                                  item (445/8511-0-04).
                -
                      '
                                      ,                                          One violation waslidentified in this subject area which'is identified                      7
                                                                                  in paragraph 2.'a of this-appendix.
          '
                          3                                       ,
          >          s'                c
              '
                                  -
                                                                  f. - Plua Welds (ISAP No. V.d)                                                              .              !
                                                                  - .                                                                                                        .
                                                                                . Status of CPRT Activity
                                                                                                                                                                  u
                                                      , ' '.'
                                                                                                                                                                              ,
                  ,                                                          .
            ,
                                                                                  Reinspection has been completed for the presence of plug welds. in two                      '
                                                                                  random samples of' cable tray hangers, consisting of 60 from Unit-1                        l
    "
                                              ''
                                                      ,
                                                                                  and 61 from Unit 2. The reinspection resulted in the identification                      u '
          t              ,          ,
                                                                                  of 23 plug welds in 14 cable tray hangers. Documentation was
                    ,                          .                                  reviewed for all cable' tray hangers containing plug welds. The
                                                                                  resultslof this re'iew
                                                                                                      v showed that'all of the plug welds were
    -
                          s
                                  d.            .-                                authorized and documented.            Due to a mix of non-ASME component supports          ;
                          ^ -                                                      with'ASME Section III NF component supports in the two original                    -
                                                                                                                                                                              l
        , . li:
        4
              '
                                                              /
                                                                    '~
                                                                                  random samples (see item A,, Notice of Deviation, NRC Inspection                            l
        <            9              j_                                            Report No.'50-445/85-13, 50-446/85-09), a new random sample of 57 NF
    '*              '                *
                                  ,
                                                                                  component supports has been created and reinspection has I,een
                                                                                  initiated.
                                                            '
                                                                                                                                                                              i
      r
  !          .       ,
                                                          '-                      Status of NRC Inspection Activity
                                                                                                                                                          '
                                                                      s
                                                                                                                                                                              l
                                -
                                                                                  Th'e NRC' inspector witnessed 23 reinspections and performed 6
                . - '                                                            independent. inspections of cable tray hangers. With respect to NF                          :
          J                                                                        component supports, the NRC inspector has witnessed'a total of 23
                                                                                .reinspections and performed a total of 4 independent inspections.
                                                              '  ;L              Eight of.the witnessed reinspections and one independent inspection
                                                                                  occurred in this report period and were from the new random sample.                        ;'
                                                                                  Indications of possible plug welds were identified in two component
                                                                              , support base plates during-the witnes:;ed inspections. The NRC-
        '
                                    -
                                                                                  inspector will witness the macroetching and inspection of these                            t
                                                                                  baseplates to determine whether or not plug welds exist.
  ''
                      -<
                                                                                  No NRC violations or deviations were identified.                                            l
                                                    ,                                                                                          '
                                                                        .
                                                                                                                                                                            .l
                              -                                                      .
.
.
                  '
,,
            m
<
                                        e
m
                                      '           '
'
                s
a
                                                                            ,
,
                  * i                                                                                   5
T
          5                                                              ,
1
                    y               ,                                                                         ,           a.
}
  x-                                                                                                   .
'
                                                                                                                              .
[ -15-
                                                                                                                                .
'
                                                                                                                                      .
o.
                                                                                                                                              _: - - _ -                 - .
:.
;
~
a
Status of NRC Inspection Activity
'
,
The NRC' inspector. witnessed'a total.of nine reinspections and
performed three independent inspections of NF supports containing
.
type _2 skewed welds. -The< results 'of NRC Region I inspections of
skewed welds are documented in NRC Inspection Report ~
No. 50-445/85-13; 50-446/85-09. The planned NRC physical inspections
'
for this ISAP have now'been completed.
NRC evaluation of TUGCO's
--
3
~ dispositions of 12 undersize type 2Lskewed field ~ welds is dependent
,
upon the processing of;the associated NCRs. This remains an open
-
^
,
'
item (445/8511-0-04).
One violation waslidentified in this subject area which'is identified
'
7
-
,
in paragraph 2.'a of this-appendix.
'
3
,
s'
c
>
f. - Plua Welds (ISAP No. V.d)
!
'
.
-
- .
.
. Status of CPRT Activity
'.
u
,
.
,
, '
'
Reinspection has been completed for the presence of plug welds. in two
'
,
random samples of' cable tray hangers, consisting of 60 from Unit-1
l
"
and 61 from Unit 2. The reinspection resulted in the identification
''
u
,
t
of 23 plug welds in 14 cable tray hangers.
Documentation was
'
,
,
reviewed for all cable' tray hangers containing plug welds. The
.
,
resultslof this re'iew showed that'all of the plug welds were
v
authorized and documented.
Due to a mix of non-ASME component supports
;
d.
.-
-
s
with'ASME Section III NF component supports in the two original
-
l
^ -
, . li:
'~
/
random samples (see item A,, Notice of Deviation, NRC Inspection
l
'
4
<
9
j _
Report No.'50-445/85-13, 50-446/85-09), a new random sample of 57 NF
'
,
'
component supports has been created and reinspection has I,een
'*
*
initiated.
i
r
!
.
,
' -
s
Status of NRC Inspection Activity
l
'
Th' NRC' inspector witnessed 23 reinspections and performed 6
e
-
independent. inspections of cable tray hangers. With respect to NF
:
. - '
J
component supports, the NRC inspector has witnessed'a total of 23
.reinspections and performed a total of 4 independent inspections.
;L
Eight of.the witnessed reinspections and one independent inspection
'
occurred in this report period and were from the new random sample.
';
Indications of possible plug welds were identified in two component
, support base plates during-the witnes:;ed inspections.
The NRC-
'
inspector will witness the macroetching and inspection of these
t
-
baseplates to determine whether or not plug welds exist.
No NRC violations or deviations were identified.
''
- <
,
.
.l
'
-
.
.
'
m
e
'
'
s
,
5
* i
,
5
a.
y
,
,
x-
.
.
.
.
.
.
: - -
-
- .


                      .-.                                                                   .-
.-.
      o
.-
o
..
..
                                              -16-                                         ,
-16-
                    ~
        .g.    Installation of Main Steam Pipes (ISAP No. V.e)
                Status of CPPT Activity-            +
            4  'The specific engineering investigation of the main steam line
                installation is, complete and is undergoing review. The report
                describing the ' analytical evaluation of stresses and support load
                changes has been issued by R. L. Cloud & Associates (RLCA) and has
                t,een reviewed by TERA.    Review and revision of pipe procedures for
                pipe erectior. and placement of temporary and permanent supports, as
            '
                well_as engineering significance of these procedures, is also
                complete.~ The TERA draft results report is still being reviewed.
                                                                                          .
                Status of NRC Inspection Activity                                      .
                The RLCA report addressing the installation of main steam pipes has
                been reviewed for adequacy with respect to the methods of analysis.
                The review included supporting computer output, calculations, piping
    ''
                models, and assumptions made. During this review the following
  -
                conditions were noted:
                (1) While the use of a "come-along"' for horizontal adjustment is
                      mentioned in Section 1.3, " Additional Background," it is not
                      addressed in the analytical portion of the report.
                (2) The 18-inch bypass line is modelled in as a schedule 60 pipe,
                      but drawing FSM-00165 specifies a schedule 40 pipe.
                      Documentation was not available to substantiate that a schedule
                      60 pipe was used. Even though the schedule 60 piping is
                      conservative as far as stress is concerned, it will have some
                      impact or, other conclusions made in the report such as vertical
                      displacements.
                (3) Figure 3-12 in the analysis does not represent computer output
                      No. RLCA P142-1-551-018, in that the node numbers do not
                      correspond.
                (4) The NRC TRT identified that sagging occurred during flushing
                      operations. RLCA states that sagging occurred before flushing.
                      The date of the flushing should be established.
                The above conditions constitute an unresolved item (445/8514-U-13).
                No NRC violations or deviations were identified.
,
,
                                          4
~
.g.
Installation of Main Steam Pipes (ISAP No. V.e)
Status of CPPT Activity-
+
'The specific engineering investigation of the main steam line
4
installation is, complete and is undergoing review.
The report
describing the ' analytical evaluation of stresses and support load
changes has been issued by R. L. Cloud & Associates (RLCA) and has
t,een reviewed by TERA.
Review and revision of pipe procedures for
pipe erectior. and placement of temporary and permanent supports, as
well_as engineering significance of these procedures, is also
'
complete.~ The TERA draft results report is still being reviewed.
.
Status of NRC Inspection Activity
.
The RLCA report addressing the installation of main steam pipes has
been reviewed for adequacy with respect to the methods of analysis.
The review included supporting computer output, calculations, piping
models, and assumptions made.
During this review the following
''
conditions were noted:
-
(1) While the use of a "come-along"' for horizontal adjustment is
mentioned in Section 1.3, " Additional Background," it is not
addressed in the analytical portion of the report.
(2) The 18-inch bypass line is modelled in as a schedule 60 pipe,
but drawing FSM-00165 specifies a schedule 40 pipe.
Documentation was not available to substantiate that a schedule
60 pipe was used.
Even though the schedule 60 piping is
conservative as far as stress is concerned, it will have some
impact or, other conclusions made in the report such as vertical
displacements.
(3) Figure 3-12 in the analysis does not represent computer output
No. RLCA P142-1-551-018, in that the node numbers do not
correspond.
(4) The NRC TRT identified that sagging occurred during flushing
operations.
RLCA states that sagging occurred before flushing.
The date of the flushing should be established.
The above conditions constitute an unresolved item (445/8514-U-13).
No NRC violations or deviations were identified.
,
4


, .
                    _ _.
                              ,          ,_ _                  ._  ,                                                      ,
                    ,
                            ,
      [G 'I *
          _
                                _
                                  ;
                                                                                                                          '
                                                                                                                        .
      li        s        i                                                  -17-
,
,
              .
_ _.
    '
,
                                        h.       Material Traceability (ISAP No. VII.a.1)
,_ _
              '
._
      <                                          ' Status of CPRT Activity
,
                                              '
,
                                                  The issue coordinator is receiving input from ISAP Nos. VII.c and           '
.
                                                  VII.b.3. This information aids in the assessment of the overall
,
                                                  material traceability control systems. Heat numbers on steel items
_
                                                  such as supports and piping are being checked as part )f the
,
                                                  reinspections to establish traceability.
[G
                                                  Status of NRC Inspection Activity
'I *
                                                  The NRC inspector has reviewed ISAP No. VII.a.1.     This review found
;
                                                  that the overall material traceability control system was to be
_
                                                  evaluated for adequacy. Preliminary results of ISAP No. VII.c
'
                                                  reinspections indicate that data on material traceability in areas
.
                                                  other than steel is not being compiled. This lack of data could
li
                                                  adversely affect the assessment of the material traceability control
-17-
                                                  systems. This matter is considered to be an unresolved item
i
                                                  (445/8514-U-14).
s
                                                  No NRC violations or deviations were identified.
,
                                        i.       Housekeeping and System Cleanliness (ISAP No. VII.a.7)
.
                                                  Status of CPRT Activity
h.
                                                  This ISAP addresses two specific TRT concerns and performs an
Material Traceability (ISAP No. VII.a.1)
                                                  overview of the program on housekeeping and system cleanliness.
'
                                                  Eleven plant surveys conducted by TUGC0 and overviewed by ERC
'
                                                    inspectors have been completed. The issue coordinator has reviewed
' Status of CPRT Activity
                                                  the procedural controls to de~cermine if requirements of
<
                                                  Criterion XIII of Appendix B to 10 CFR Part 50 and the FSAR are
'
                                                    included. Inputs from ISAP Nos. II.c, V.b, VI.a, and recent
'
                                                  TUGC0/B&R audit reports, surveys, and other quality documents are
The issue coordinator is receiving input from ISAP Nos. VII.c and
                                                  being reviewed to evaluate the effE;tiveness of the current program.
VII.b.3.
                                                . Specific TRT concern on the number of chloride residue. swipes made on
This information aids in the assessment of the overall
                                                  the wall and bottom of the reactor vessel has beerr investigated. Tha.
material traceability control systems.
                                                  procedure controlling this activity required two swipes to be made,
Heat numbers on steel items
  .
such as supports and piping are being checked as part )f the
                                                  but the file documentation shows that eight swipes were made and
reinspections to establish traceability.
          .                                         found acceptable. Flush plan.FP-55-08, the controlling procedure, is
Status of NRC Inspection Activity
                                              , a specific one-time procedure.     Ther fore, no revision to this
The NRC inspector has reviewed ISAP No. VII.a.1.
    ,                                              procedure is being made.   Comments on the adequacy of the number of
This review found
            '
that the overall material traceability control system was to be
                            '
evaluated for adequacy.
                                                    swipes made will be~in the results report.
Preliminary results of ISAP No. VII.c
                                                  Specific TRT concern o'n lack of protective covering on equipment near
reinspections indicate that data on material traceability in areas
                                    '
other than steel is not being compiled.
                                                  welding activities will be addressed by reviewing the results of             I
This lack of data could
                .                                  plant surveys.      *
adversely affect the assessment of the material traceability control
                                                                                                                                l
systems. This matter is considered to be an unresolved item
(445/8514-U-14).
No NRC violations or deviations were identified.
i.
Housekeeping and System Cleanliness (ISAP No. VII.a.7)
Status of CPRT Activity
This ISAP addresses two specific TRT concerns and performs an
overview of the program on housekeeping and system cleanliness.
Eleven plant surveys conducted by TUGC0 and overviewed by ERC
inspectors have been completed.
The issue coordinator has reviewed
the procedural controls to de~cermine if requirements of
Criterion XIII of Appendix B to 10 CFR Part 50 and the FSAR are
included.
Inputs from ISAP Nos. II.c, V.b, VI.a, and recent
TUGC0/B&R audit reports, surveys, and other quality documents are
being reviewed to evaluate the effE;tiveness of the current program.
. Specific TRT concern on the number of chloride residue. swipes made on
the wall and bottom of the reactor vessel has beerr investigated.
Tha.
procedure controlling this activity required two swipes to be made,
but the file documentation shows that eight swipes were made and
.
found acceptable.
Flush plan.FP-55-08, the controlling procedure, is
.
, a specific one-time procedure.
Ther fore, no revision to this
procedure is being made.
Comments on the adequacy of the number of
,
'
'
swipes made will be~in the results report.
Specific TRT concern o'n lack of protective covering on equipment near
'
welding activities will be addressed by reviewing the results of
l
l
    w                                         ,                                                                                 1
.
    4- .                                                                   .
plant surveys.
                          .
*
                                      '                                                                                         i
w
                                          '
,
                                                                                                                                I
4- .
                                      'i                                                                                         j
.
                        .'                       ,
.
'
i
'
'i
j
.'
,


                                                                      -
-
                                                                                                                            .
.
        -
-
  u..           -
-
                                                              .,
u..
          .
.,
                                            .
.
                                                -18-
.
                                                                                                                  -
-18-
                  Status of NRC Inspection Activity
-
      ,
Status of NRC Inspection Activity
                  The NRC inspector has witnessed plant surveys of the safeguards
,
The NRC inspector has witnessed plant surveys of the safeguards
building, Unit 2 reactor area, millwright shop, and ironworkers shop.
'
During these surveys, items.such as trash or unidentified material
were found in laydown areas where Quality (Q) material was stored.
These items were noted by TUGC0 and ERC personnel. . An independent
NRC resurvey of these areas found that the noted discrepant
conditions had been restored to requirements.
The NRC inspector reviewed the file for FP-55-08' to verify that the
eight chloride residue swipes had been taken for the reactor vessel
wall and bottom.
These swipes were found to be documented as
performed and acceptable.
In addition, numerous swipes had been
,
taken on reactor internals and the hot and cold legs.
These were
also acceptable.
No NRC violations or deviations were identified.
j.
Valve Disassembly (ISAP No. VII.b.2)
Status of CPRT Activity
p
A second reinspection of seven Borg-Warner (8-W) valves was conducted
using B-W serial numbers for body and bonnet identification.
This
reinspection was necessitated by the fact that identification numbers
used in the initial reinspection were traceable to material heat
numbers, but were not necessarily unique to each valve bonnet or
body.
No DRs were issued as a result of the second reinspection.
All reinspections are now complete.
Of a total of four valid DRs
issued for this ISAP, three SSEs have been completed.
The fourth DR
(VALV-9-1) identifies a mismatch between the identification numbers
observed on the valve bonnet and that which is listed in the QA/QC
documentation package for the valve.
QA/QC documentation for the
actual installed bonnet has not been located to date.
A difference was identified by the SSE engineer between the
respective design temperature and pressure listed by G&H and those
listed by Westinghouse for the Chemical Volume Control system.
'
Specifically,theg&Hlinedesignationtableliststhedesign
temperature as 250 F and the design pressure as 300 psi, while the
i
correspondingWestinghousedgsigntemperatureandpressureare
listed, respectively, as 150 F and 150 psi.
The NRC inspector was informed by the SSE~ engineer that disposition
of the remaining SSE is pending receipt of information from TUGC0
regarding valve temperature / pressure. ratings and TUGC0 resolution of
,
the above described difference in design conditions.
'
'
                  building, Unit 2 reactor area, millwright shop, and ironworkers shop.
.
                  During these surveys, items.such as trash or unidentified material
9
                  were found in laydown areas where Quality (Q) material was stored.
-
                  These items were noted by TUGC0 and ERC personnel. . An independent
-
                  NRC resurvey of these areas found that the noted discrepant
,
                  conditions had been restored to requirements.
!
                  The NRC inspector reviewed the file for FP-55-08' to verify that the
.
                  eight chloride residue swipes had been taken for the reactor vessel
.
                  wall and bottom. These swipes were found to be documented as
            ,
                  performed and acceptable. In addition, numerous swipes had been
                  taken on reactor internals and the hot and cold legs.    These were
                  also acceptable.
                  No NRC violations or deviations were identified.
                j. Valve Disassembly (ISAP No. VII.b.2)
                  Status of CPRT Activity
                p  A second reinspection of seven Borg-Warner (8-W) valves was conducted
                  using B-W serial numbers for body and bonnet identification. This
                  reinspection was necessitated by the fact that identification numbers
                  used in the initial reinspection were traceable to material heat
                  numbers, but were not necessarily unique to each valve bonnet or
                  body. No DRs were issued as a result of the second reinspection.
                  All reinspections are now complete. Of a total of four valid DRs
                  issued for this ISAP, three SSEs have been completed. The fourth DR
                  (VALV-9-1) identifies a mismatch between the identification numbers
                  observed on the valve bonnet and that which is listed in the QA/QC
                  documentation package for the valve. QA/QC documentation for the
                  actual installed bonnet has not been located to date.
                  A difference was identified by the SSE engineer between the
                  respective design temperature and pressure listed by G&H and those
                  listed by Westinghouse for the Chemical Volume Control system.                                              '
                  Specifically,theg&Hlinedesignationtableliststhedesign                                                        l
                  temperature as 250 F and the design pressure as 300 psi, while the                                          i
                  correspondingWestinghousedgsigntemperatureandpressureare
                  listed, respectively, as 150 F and 150 psi.
                  The NRC inspector was informed by the SSE~ engineer that disposition
                  of the remaining SSE is pending receipt of information from TUGC0
                  regarding valve temperature / pressure. ratings and TUGC0 resolution of                                      ,
                  the above described difference in design conditions.                                                          I
                                                                                                                                1
                                                  '
                                                    .
                                                                          9
                                                                              -
                                                        -
              ,
                                                                        !
                                                                                _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ .


r - .
r - .
        ''
''
  1.'
1.'
                                                  -19-
-19-
                s
s
                      Status of NRC Inspection Activity
Status of NRC Inspection Activity
                    A total of eight reinspections have been witnessed by the NRC
A total of eight reinspections have been witnessed by the NRC
                      inspector, one of which was a reinspection of a B-W valve during this
inspector, one of which was a reinspection of a B-W valve during this
                      report period. Independent NRC inspections have also been performed
report period.
                      on five valves in the combined random and engineering samples.
Independent NRC inspections have also been performed
                    The NRC inspector was informed by TUGC0 Field Mechanical Engineering
on five valves in the combined random and engineering samples.
                      personnel that: (1) the previously described differences between G&H
The NRC inspector was informed by TUGC0 Field Mechanical Engineering
                      and Westinghouse design conditions had also been identified by TUGCO,
personnel that: (1) the previously described differences between G&H
  '
and Westinghouse design conditions had also been identified by TUGCO,
                      and (2) a comparison of G&H and Westinghouse design conditions for
'
                    ' mechanical equipment had been conducted by TUGC0 which resulted in
and (2) a comparison of G&H and Westinghouse design conditions for
                      the identification of several. design pressure and temperature
' mechanical equipment had been conducted by TUGC0 which resulted in
                      differences.
the identification of several. design pressure and temperature
                      The NRC inspector also noted that NCRs have.been written by TUGC0 for
differences.
                      several valves having temperature and/or pressure ratings listed on
The NRC inspector also noted that NCRs have.been written by TUGC0 for
                      the Code Data Log that are different from those listed in the G&H
several valves having temperature and/or pressure ratings listed on
                      line designation table. It was not immediately apparent whether or
the Code Data Log that are different from those listed in the G&H
                      not the Westinghouse /G&H comparison study had also identified these
line designation table.
                      differences.
It was not immediately apparent whether or
not the Westinghouse /G&H comparison study had also identified these
differences.
Verification of the adequate resolution of differences identified in
"
"
                      Verification of the adequate resolution of differences identified in
the Westinghouse /G&H comparison study and those identified in NCRs is
      ,              the Westinghouse /G&H comparison study and those identified in NCRs is
,
                      considered unresolved and will be evaluated further during a
considered unresolved and will be evaluated further during a
                      subsequent reporting period (445/8514-U-15).
subsequent reporting period (445/8514-U-15).
                      No NRC violations or deviations were identified.
No NRC violations or deviations were identified.
          7.   ISAP No. VII.c
7.
                a.   Electrical Cable
ISAP No. VII.c
                      Status of CPRT Activity
a.
                      ERC has completed 85 reinspections and 71 documentation reviews of
Electrical Cable
                      sampled electrical cable as of October 30, 1985.
Status of CPRT Activity
                      Status of NRC Inspection Activity
ERC has completed 85 reinspections and 71 documentation reviews of
                      (1) The following eight ERC reinspections of sampled electrical
sampled electrical cable as of October 30, 1985.
                            cable were witnessed by the NRC during this report period:
Status of NRC Inspection Activity
                            Verification Package No.             Cable No.
(1) The following eight ERC reinspections of sampled electrical
                            I-E-CABL-078                         EG113538
cable were witnessed by the NRC during this report period:
                            I-E-CABL-084                         EG104608
Verification Package No.
              .
Cable No.
I-E-CABL-078
EG113538
I-E-CABL-084
EG104608
.


--       --
--
        *
--
      .
*
                            .
.
                                                -20-                                                                 '
.
                    ,
-20-
                      I-E-CABL-086                           E0121816Z
'
                      I-E-CABL-088                           E0124088
,
                      I-E-CABL-089                           EG123639Z
I-E-CABL-086
                      I-E-CABL-098                           E0145694
E0121816Z
                      I-E-CABL-101                           E0122951
I-E-CABL-088
                      I-E-CABL-102                           EG139519
E0124088
              ' (2) Ouring the above reinspections, ERC identified the following
I-E-CABL-089
                      conditions to the NRC inspector as subject to evaluation as
EG123639Z
                      potential deviations:
I-E-CABL-098
                      (a)   I-E-CABL-037:     Two through-the-wall sleeves had identical
E0145694
                            identification tag number TWS-E-010. The cable run also
I-E-CABL-101
                            deviated from the cable run schedule.
E0122951
                      (b)   I-E-CABL-084:     Cable run deviated from the cable run
I-E-CABL-102
                            schedule and cable was routed through C13G06325 instead of
EG139519
                            C13G06324.
' (2) Ouring the above reinspections, ERC identified the following
                      (c)   I-E-CABL-098: There was no identification tag on the
conditions to the NRC inspector as subject to evaluation as
                            conduit nipple. Cable E0145694 was found to not have the
potential deviations:
                            required 2 inches of slack in free air as it exited conduit
(a)
                            C13016044 into cable tray. A hold tag with NCR
I-E-CABL-037:
                            E85-101141SX had been placed on the conduit as a result of
Two through-the-wall sleeves had identical
                            a prior inspection identifying the same condition.
identification tag number TWS-E-010.
                      Dispositions of the above findings are open items (445/8514-0-03
The cable run also
                      through 445/8514-0-05).
deviated from the cable run schedule.
                (3) ERC also noted the following deficiencies outside the defined
(b)
                      inspection scope:
I-E-CABL-084:
                      I-E-CABL-086: Conduit was 1 1/2 inches instead of the 2-inch
Cable run deviated from the cable run
                      size specified and a loose conduit coupling was'noted where
schedule and cable was routed through C13G06325 instead of
                      conduit penetrated a wall.
C13G06324.
                      Dispositions of the above findings are an open item
(c)
                      (445/8514-0-06).                         .
I-E-CABL-098: There was no identification tag on the
                (4) NRC inspectors did not identify any additional discrepancies
conduit nipple.
                      with respect to the above eight packages.
Cable E0145694 was found to not have the
                                                                                                                      l
required 2 inches of slack in free air as it exited conduit
                                                                                                                      .
C13016044 into cable tray. A hold tag with NCR
                                                  .
E85-101141SX had been placed on the conduit as a result of
                                    4
a prior inspection identifying the same condition.
                                                              %
Dispositions of the above findings are open items (445/8514-0-03
through 445/8514-0-05).
(3) ERC also noted the following deficiencies outside the defined
inspection scope:
I-E-CABL-086:
Conduit was 1 1/2 inches instead of the 2-inch
size specified and a loose conduit coupling was'noted where
conduit penetrated a wall.
Dispositions of the above findings are an open item
(445/8514-0-06).
.
(4) NRC inspectors did not identify any additional discrepancies
with respect to the above eight packages.
l
.
.
4
%
I
I
    h,                                                                         _ _      _ _ _ _ _ _ _ _ _ _ _ _ _ _
h,


                        - -
- -
            ,
,
                                                      -21-
-21-
                    4
4
                        (5) Independent documentation reviews were performed of 10
(5) Independent documentation reviews were performed of 10
                              verification packages comprising 22 cables. The results of the
verification packages comprising 22 cables.
      '
The results of the
        ,,                    independent reviews are an open item pending NRC review of ERC
'
                              results (445/8514-0-07).
independent reviews are an open item pending NRC review of ERC
                        (6) The NRC inspector noted that NCRs have been written by TUGC0
,,
                              QA/QC personnel in regard to potential electrical cable damage
results (445/8514-0-07).
  '
(6) The NRC inspector noted that NCRs have been written by TUGC0
                              resulting from installation practices used for cable support
QA/QC personnel in regard to potential electrical cable damage
                              grips. TUGC0 engineering has provided information to assist in
resulting from installation practices used for cable support
                              the disposition of the NCRs. This matter is considered
'
                              unresolved pending review of supplemental information from TIIGC0
grips. TUGC0 engineering has provided information to assist in
                              and will be evaluated further in a subsequent report
the disposition of the NCRs.
                              (445/8514-U-16).
This matter is considered
                b.   Cable Trays
unresolved pending review of supplemental information from TIIGC0
              '
and will be evaluated further in a subsequent report
                      Status of CPRT Activity
(445/8514-U-16).
                        ERC has completed 84 reinspections and 78 documentation r views of
b.
                        sampled cable trays as of October 30, 1985.
Cable Trays
                        Status of NRC Inspection Activity
'
,                      (1) The following two ERC reinspections of sampled cable trays were
Status of CPRT Activity
                              witnessed by the NRC in this report period:
ERC has completed 84 reinspections and 78 documentation r views of
sampled cable trays as of October 30, 1985.
Status of NRC Inspection Activity
(1) The following two ERC reinspections of sampled cable trays were
,
'
'
                              Verification Package No.                 Cable Tray No.
witnessed by the NRC in this report period:
                              I-E-CATY-201                           T220SBC89
Verification Package No.
                              I-E-CATY-247                           TBGCCM62
Cable Tray No.
          4
I-E-CATY-201
                      -
T220SBC89
                              No deficiencies were noted by ERC or NRC inspectors during these
I-E-CATY-247
                            . inspections.
TBGCCM62
                        (2) The NRC performed independent reinspections of two electrical
4
                              cable trays. The results of these inspections are open-items
-
                              pending NRC review of ERC inspection results and documentation
No deficiencies were noted by ERC or NRC inspectors during these
    '
. inspections.
                              reviews (445/8514-0-08) and (446/8511-0-12).
(2) The NRC performed independent reinspections of two electrical
                        (3) The NRC performed independent documentation reviews of seven
cable trays.
                              verification packages for seven cable trays.   The results of
The results of these inspections are open-items
                              these reviews are an open item pending NRC review of ERC review
pending NRC review of ERC inspection results and documentation
                              results (445/8514-0-09).                                           j
'
                        No NRC violations or deviations were identified.                         '
reviews (445/8514-0-08) and (446/8511-0-12).
                                  '
(3) The NRC performed independent documentation reviews of seven
                                                                                                  ;
verification packages for seven cable trays.
                                                                                                  l
The results of
                                                                                                .
these reviews are an open item pending NRC review of ERC review
results (445/8514-0-09).
j
No NRC violations or deviations were identified.
'
'
.
.-- --


      - _ ,   -- .                 __                               _       _ _ - -
- _ ,
  .q.
-- .
          '
__
  :s                                                 -22-
_
                    c. Electrical Conduit
_ _ - -
                        Status of CPRT Activity
.q.
        ,              ERC has completed 79 reinspections and 76 documentation reviews of
'
                        sampled electrical conduit as of October 30, 1985.
:s
                        Status of NRC Inspection Activity
-22-
                        (1) _The following two ERC reinspections of sampled electrical
c.
                            conduit were witnessed by the NRC in this reporting period:
Electrical Conduit
                            Verification Package No.                    Conduit No.
Status of CPRT Activity
                            I-E-COUT-089                                C13G07757
ERC has completed 79 reinspections and 76 documentation reviews of
                            I-E-CDUT-098                                C12020693            .
                            No deficiencies were noted by ERC or NRC inspecturs during these
                            inspections.
                        (2) The NRC inspectors performed independent documentation reviews
                            of the following verification packages for sampled electrical
                            conduits:
                            Verification Package No.                    Conduit No.
                            R-E-CDUT-007                                C13010190
                            R-E-C00T-051                                EAB1-1
                            R-E-CDUT-064                                C13016037
                            R-E-CDUT-070                                C14R13047
                            R-E-CDUT-076                                C12008750
                            R-E-CDUT-077                                C13005532
                            R-E-COUT-086                                C13030044
                            R-E-CDUT-089                                C13G07757
                            R-E-CDUT-098                              .C12020693
                            During the above documentation reviews the NRC inspectors
                            observed the following deficiencies:
                            (a) Lighting conduit EAB1-1 was physically reinspected by ERC
                                  and witnessed by NRC. ERC subsequently discarded this item
                                  from the sample of conduit population,.because not enough
                                  attributes were accessible for inspection. The NRC
                                  inspector performed an independent documentation review of
                                  this field witnessed activity and noted that the TUGC0
                                  electrical inspector, who signed the final irs E-1-0027419
                                  and E-1-0024951 for conduit EAB1-1, was not certified to
                                  Procedure QI-QP-11.3-25.    TUGC0 Procedures CP-QP-2.1 and
                                  QI-QP-2.1-3 require that inspection personnel be certified
,
,
            %'
sampled electrical conduit as of October 30, 1985.
Status of NRC Inspection Activity
(1) _The following two ERC reinspections of sampled electrical
conduit were witnessed by the NRC in this reporting period:
Verification Package No.
Conduit No.
I-E-COUT-089
C13G07757
I-E-CDUT-098
C12020693
.
No deficiencies were noted by ERC or NRC inspecturs during these
inspections.
(2) The NRC inspectors performed independent documentation reviews
of the following verification packages for sampled electrical
conduits:
Verification Package No.
Conduit No.
R-E-CDUT-007
C13010190
R-E-C00T-051
EAB1-1
R-E-CDUT-064
C13016037
R-E-CDUT-070
C14R13047
R-E-CDUT-076
C12008750
R-E-CDUT-077
C13005532
R-E-COUT-086
C13030044
R-E-CDUT-089
C13G07757
R-E-CDUT-098
.C12020693
During the above documentation reviews the NRC inspectors
observed the following deficiencies:
(a) Lighting conduit EAB1-1 was physically reinspected by ERC
and witnessed by NRC.
ERC subsequently discarded this item
from the sample of conduit population,.because not enough
attributes were accessible for inspection.
The NRC
inspector performed an independent documentation review of
this field witnessed activity and noted that the TUGC0
electrical inspector, who signed the final irs E-1-0027419
and E-1-0024951 for conduit EAB1-1, was not certified to
Procedure QI-QP-11.3-25.
TUGC0 Procedures CP-QP-2.1 and
QI-QP-2.1-3 require that inspection personnel be certified
,
%'


n                         ..
n
                                          _
..
                                                  -.         -     -
_
                                                                                                              -,
-.
    .
-
              ''                                                                 (                                l
-
            s
-,
                r       ,
.
                                                        -23-
(
        ,
l
                                      for a given inspaction function / activity as being qualified
' '
                                      to perform their assigned tasks. The lack of certification
s
  ,
r
                                      of the ThiC0 electrical inspector performing the inspection
,
                      -
-23-
                                      of record for conduit EAB1-1 is a violation
for a given inspaction function / activity as being qualified
      '
,
                                      (445/8514-V-04).
to perform their assigned tasks.
                                (b)   ISAP No. VII.c requires original documentation review for
The lack of certification
                                      attributes deemed to be inaccessible. A portion of conduit
of the ThiC0 electrical inspector performing the inspection
                                      C13616037 was found to be inaccessible during reinspection
,
                    ,                as a result of being covered with separation barrier
-
          '
of record for conduit EAB1-1 is a violation
                                      material (SBM). There was no evidence in ERC's
(445/8514-V-04).
'
(b)
ISAP No. VII.c requires original documentation review for
attributes deemed to be inaccessible.
A portion of conduit
C13616037 was found to be inaccessible during reinspection
as a result of being covered with separation barrier
,
material (SBM).
There was no evidence in ERC's
'
,
,
                                      Verification Package No. R-E-CDUT-064 that a check was made
Verification Package No. R-E-CDUT-064 that a check was made
for attributes which were not accessible due to SBM
'
'
                                      for attributes which were not accessible due to SBM
installation.
                                      installation. This is an NRC deviation (445/8514-0-02).
This is an NRC deviation (445/8514-0-02).
                                (c) QI-009, Revision 0, " Document Review of Conduit /R-E-CDUT,"
(c) QI-009, Revision 0, " Document Review of Conduit /R-E-CDUT,"
                                      requires the reviewer to record the SBM IR and/or latest
requires the reviewer to record the SBM IR and/or latest
                                    -construction operation traveler number at the bottom of the
-construction operation traveler number at the bottom of the
                                      checklist. The checklist for conduit C13016037 in
checklist.
                                      Verification Package No. R-E-CDUT-064 did not contain this
The checklist for conduit C13016037 in
                                      required documentation. This item is an NRC deviation
Verification Package No. R-E-CDUT-064 did not contain this
                                      (445/8514-0-03).
required documentation.
                                (d) QI-009, Revision 0, " Document Review of Conduit /R-E-CDUT,"
This item is an NRC deviation
                                      also requires the ERC inspector to verify that irs signed
(445/8514-0-03).
                                      by electrical inspectors were " dated after their date of
(d) QI-009, Revision 0, " Document Review of Conduit /R-E-CDUT,"
                                      certification and prior to their date of expiration."
also requires the ERC inspector to verify that irs signed
                                      ERC Verification Package No. R-E-CDUT-070 for conduit
by electrical inspectors were " dated after their date of
                                      C14R13047 failed to indicate that the ERC inspector
certification and prior to their date of expiration."
                                      observed that the electrical inspector signing IR-E-46087
ERC Verification Package No. R-E-CDUT-070 for conduit
                                      was not certified to QI-QP-11.3-23 on the date of
C14R13047 failed to indicate that the ERC inspector
                                      inspection. This item is an NRC deviation (445/8514-0-03).
observed that the electrical inspector signing IR-E-46087
                                (e) During this review, the NRC inspector observed that TUGC0
was not certified to QI-QP-11.3-23 on the date of
                                      inspection procedures (i.e., QI-QP-11.3-23 and
inspection.
                                      QI-QP-11.3-23.11) for conduit did not require inspection
This item is an NRC deviation (445/8514-0-03).
                                      for separation between approximately September 1979 and
(e) During this review, the NRC inspector observed that TUGC0
                                      November 1983. The NRC inspector was informed that a
inspection procedures (i.e., QI-QP-11.3-23 and
                                      decision was made to inspsct conduit for separation af ter
QI-QP-11.3-23.11) for conduit did not require inspection
                                      construction completion, on a room-by-room basis. The NRC
for separation between approximately September 1979 and
                                      inspector was also informed that this activity is
November 1983.
                                      prescribed in QI-QP-11.3-29 and that documentary evidence
The NRC inspector was informed that a
                                      is available in the Permanent Plant Records Vault (PPRV),
decision was made to inspsct conduit for separation af ter
                                      filed by area or room " turn over" numbers.
construction completion, on a room-by-room basis.
                                      This item is considered unresolved pending review of this
The NRC
                                      documentation (445/8514-U-17).
inspector was also informed that this activity is
                  ,
prescribed in QI-QP-11.3-29 and that documentary evidence
                              ,
is available in the Permanent Plant Records Vault (PPRV),
                                                                                                    ___._________w
filed by area or room " turn over" numbers.
This item is considered unresolved pending review of this
documentation (445/8514-U-17).
,
,
.
w


-_ .         . _ . _ .           _     _             _     ..
-_ .
  (       ' '
.
                                                                i
_ . _ .
                                                                          *
_
                                                          24-
_
      -
_
    .,
..
                              (f) The NRC inspector observed during documentation review of
'
                                    conduit C13016037 that the ERC inspector did not review
(
                                    construction operation traveler EE83-0997-8904 for other
'
                                    than inspector certification and correct QI reference on
*
                                    the traveler,   it was also noted that construction
i
                                    operation travelers EE84-10324-8904, EE84-10505-8904,,and
.,
                                    'EE85-11255-8904, in response to Item Removal Notices (IRNs)
24-
                                    for SBM removal and replacement, were not reviewed to
-
                                    ascertain the certification status of any additional
(f) The NRC inspector observed during documentation review of
                                    inspectors that had been used to those that signed the
conduit C13016037 that the ERC inspector did not review
                                    applicable irs. This item is unresolved pending NRC review
construction operation traveler EE83-0997-8904 for other
                                    of construction operation traveler documentation in the
than inspector certification and correct QI reference on
                                    PPRV (445/8514-U-18).
the traveler,
                              (g) The NRC inspector reviewed documentation for six other
it was also noted that construction
                                    conduits. ERC reviews were scheduled but had not been
operation travelers EE84-10324-8904, EE84-10505-8904,,and
                                    completed. The results of these review:; will be reported in
'EE85-11255-8904, in response to Item Removal Notices (IRNs)
                                    a subsequent report after comparison of NRC review results
for SBM removal and replacement, were not reviewed to
                                    with the completed ERC results. This is an open item
ascertain the certification status of any additional
                                    (445/0514-0-10).
inspectors that had been used to those that signed the
                              (h) The NRC inspector observed that documentation reviews for
applicable irs.
                                    lighting conduits could not be performed by ERC because
This item is unresolved pending NRC review
                                    QI-009, Revision 0, does not address the relevant QIs;
of construction operation traveler documentation in the
                                    i.e., QI-QP-11.3-25 and QI-QP-11.3-9. This is an open item
PPRV (445/8514-U-18).
                                    pending the issuance of new instructions or a subsequent
(g) The NRC inspector reviewed documentation for six other
                                    revision to QI-009 (445/8514-0-11).
conduits. ERC reviews were scheduled but had not been
                d.       Electrical Equipment Installation
completed. The results of these review:; will be reported in
                                                                                          ,
a subsequent report after comparison of NRC review results
                        Status of CPRT Activity
with the completed ERC results. This is an open item
                        ERC has completed 20 reinspections and 19 documentation reviews of
(445/0514-0-10).
                        sampled electrical equipment installations as of Octouer 30,
(h) The NRC inspector observed that documentation reviews for
                        1985. This reinspection total is lower than the number (i.e.,21)
lighting conduits could not be performed by ERC because
                        reported in NRC Inspection Report No. 50-445/85-13, 50-446/85-09 as
QI-009, Revision 0, does not address the relevant QIs;
                        being performed by September 20, 1985. The difference arose as a
i.e., QI-QP-11.3-25 and QI-QP-11.3-9.
                        result of revision to QI-010 and institution of re-review of
This is an open item
                        previous.j completed packages for compliance to the revised QI.
pending the issuance of new instructions or a subsequent
                        Status of NRC Inspection Activity
revision to QI-009 (445/8514-0-11).
                        (1) The following ERC reinspection of, sampled electrical equipment
d.
                              installation was witnessed b/ the NRC:
Electrical Equipment Installation
                                                                                                  )
,
                                                                                                  ;
Status of CPRT Activity
                                                                                                  1
ERC has completed 20 reinspections and 19 documentation reviews of
  '
sampled electrical equipment installations as of Octouer 30,
        -
1985.
                                                                                                  I
This reinspection total is lower than the number (i.e.,21)
                                                                                                  '
reported in NRC Inspection Report No. 50-445/85-13, 50-446/85-09 as
    ,.
being performed by September 20, 1985.
The difference arose as a
result of revision to QI-010 and institution of re-review of
previous.j completed packages for compliance to the revised QI.
Status of NRC Inspection Activity
(1) The following ERC reinspection of, sampled electrical equipment
installation was witnessed b/ the NRC:
'
-
I
'
,.
.
-


    >
>
a
,
,
  a
-25-
                                      -25-
,
,
:              Verification rackage No.                   Equipment No.
Verification rackage No.
              I-E-EEIN-059                               CP1-ECDPEC-12
Equipment No.
              No deficiencies were noted by ERC or NRC inspectors during this
:
              inspection.
I-E-EEIN-059
        (2) The NRC performed an independent documentation review of one
CP1-ECDPEC-12
l              sampled electrical equipment installation. The results of this
No deficiencies were noted by ERC or NRC inspectors during this
              review are an open item pending comparison with ERC results when
inspection.
i              available (445/8514-0-12).
(2) The NRC performed an independent documentation review of one
              No NRC violations or deviations were identified.
      e. Instrumentation Equipment Installation
l
l
        Status of CPRT Activity
sampled electrical equipment installation. The results of this
review are an open item pending comparison with ERC results when
i
available (445/8514-0-12).
No NRC violations or deviations were identified.
e.
Instrumentation Equipment Installation
l
l
l       ERC has completed 75 reinspections and 75 documentation reviews of
l
l       sampled instrumentation equipment installations as of October 30,
Status of CPRT Activity
l       1985.
l
ERC has completed 75 reinspections and 75 documentation reviews of
l
sampled instrumentation equipment installations as of October 30,
l
1985.
'
'
                                                                                <
<
        Status of NRC Inspection Activity
Status of NRC Inspection Activity
        (1) To date, eight reinspections have been witnessed by NRC
(1) To date, eight reinspections have been witnessed by NRC
              inspectors with the following five reinspections witnessed in
inspectors with the following five reinspections witnessed in
              this report period:
this report period:
              Verification Package No.                   Unit No.
Verification Package No.
                                                                                !
Unit No.
!
I-E-ININ-072
1
l
l
'
'
              I-E-ININ-072                                  1
I-E-ININ-079
              I-E-ININ-079                                  1
1
              I-E-ININ-069                                 1
I-E-ININ-069
              I-E-ININ-076                                 1
1
              I-E-ININ-066                                 1
I-E-ININ-076
        (2) During the above reinspections, ERC identified the following
1
              conditions as subject to evaluation as potential deviations:
I-E-ININ-066
              I-E-ININ-072:
1
                                                                                ,
(2) During the above reinspections, ERC identified the following
              (a) G&H Specification 2323-MS-625 and QI-012, Revision 0,         ,
conditions as subject to evaluation as potential deviations:
                    require a slope for process wetted lines of 1 inch per foot
I-E-ININ-072:
                    minimum, except that where physical layout is a problem the
,
                    minimum slope may be reduced to 1/4 inch per foot. The
(a) G&H Specification 2323-MS-625 and QI-012, Revision 0,
                    tubing line from the root valve to the instrument was found
,
                    to only have a slope of 1/2 inch on 9 inches and physical
require a slope for process wetted lines of 1 inch per foot
                    layout did not appear to be a problem.
minimum, except that where physical layout is a problem the
                                                                                '
minimum slope may be reduced to 1/4 inch per foot.
              (b) Drawing 2323-M1-2613, Revision 2, shows instrument
The
                    1-P15-4251 as being located 6 feet 0 inches off the wall.
tubing line from the root valve to the instrument was found
                                                                                t
to only have a slope of 1/2 inch on 9 inches and physical
layout did not appear to be a problem.
'
(b) Drawing 2323-M1-2613, Revision 2, shows instrument
1-P15-4251 as being located 6 feet 0 inches off the wall.
t
.
.
. . . .
.
.
.
.
. .
. .
.
.
.
.
.
.


            -
                              --        -      _ _ _ _      --.--- - - _ _ _ _ . -            --_ - _ _      -  -  _ _ - - - - _ - - _ -_              - - - - . _ _ _ - . -
,
,
  ;g               c*                     _p
-
                                                                                                                                                      '
--
                                            ,
-
_ _ _ _
--.--- - - _ _ _ _ . -
--_ - _ _
-
-
_ _ - - - - _ - - _ -_
- - - - . _ _ _ - . -
;g
c*
_p
'
,
'
'
                                                              i
i
                                                                                                          -26-
-26-
                            .
.
    '
This instrument was actually.Incated 5 feet 0 inches off
                                                                                      This instrument was actually.Incated 5 feet 0 inches off
'
                                                                                      the wall.
the wall.
                                      .               <
<
        A"                     .                                I-E-ININ-079: The tubing line from the component cooling water
.
' " '                                                          pump 1A to !nstrument 1-PT-4520 had reverse slope where it
A"
                                                              passed under the discharge line.
I-E-ININ-079: The tubing line from the component cooling water
                                                                                    ,
.
  s
pump 1A to !nstrument 1-PT-4520 had reverse slope where it
                                                                I-E-ININ-066: Required color code was missing and maximum
' " '
                                                              allowable distance between color code marks' was exceeded.
passed under the discharge line.
        '
,
    '
s
                                                                I-E-ININ-069: Sending units 1-LS-6712 and 1-LS-6717 were found
I-E-ININ-066: Required color code was missing and maximum
                                                                to be "eversed.
allowable distance between color code marks' was exceeded.
                                  s.
'
                                                              Dispositions of the above findings are open items (445/8514-0-13
'
                                                                through 445/8514-0-16).
I-E-ININ-069:
Sending units 1-LS-6712 and 1-LS-6717 were found
to be "eversed.
s.
Dispositions of the above findings are open items (445/8514-0-13
through 445/8514-0-16).
(
(
                          ,                                    No NRC violations or deviations were identified.
No NRC violations or deviations were identified.
,
t
t
.
.
(3) ERC also noted the following deficiency outside of the defined
'
inspection scope:
l.
I-E-ININ-079: C1413591 was damaged at the connection to the
j
instrument 1-PT-4520.
Disposition of the :above finding'is an open item
l-
(445/8514-0-17).
.
No NRC violations or deviations were identified.
(4) The following independent ddcumentation reviews of sampled
instrumentation equipment installations were made by the NRC
inspectors:
'
'
                                                        (3) ERC also noted the following deficiency outside of the defined
                                                                inspection scope:
l.                                                              I-E-ININ-079: C1413591 was damaged at the connection to the
j                                                                instrument 1-PT-4520.
                                                              Disposition of the :above finding'is an open item
l-                                                              (445/8514-0-17).                                                                                                  .
                                                                No NRC violations or deviations were identified.
                                                        (4) The following independent ddcumentation reviews of sampled
                                                                instrumentation equipment installations were made by the NRC
                                                                inspectors:                                                                            '
                                                                                                                                                                                          l
                                                                                                                        ,
                                      ,
                                                              Verification Package No.                                                      Instrument No.
                                                                                                                                                  '
                                                                R-E-ININ-005                                                                1-LS-4795
                                  -      ,                  R-E-ININ-060                                                                  1-LS-3376
l
l
                                                                (a) During the review of these packages, the NRC inspector
,
          '
Verification Package No.
                                                                                      noted that the procedure used (i.e., QI-013, Revision 4)
Instrument No.
                                                                                      did not provide detailed instructions for checking original ~                                       ,
,
                                ".
'
                                  ' '
R-E-ININ-005
                                                                                      documentation for attributes which were inaccessible or                                               '
1-LS-4795
:                                                                                     nonrecreatable during the physical inspections of these                                               i
R-E-ININ-060
                                                                                      instrument installations. According to paragraph 4.1 of                                       ' '
1-LS-3376
              -
-
                                                                                      ISAP No. VII.c Revision 0, documentation reviews will be
,
  s
l
                                                                                      utilized to supplement reinspections for attributes which
(a) During the review of these packages, the NRC inspector
          *
noted that the procedure used (i.e., QI-013, Revision 4)
                                                                                      Pre nonrecreatable or inaccessible. Paragraph 4.1.3 of the                                             )
'
        ,
did not provide detailed instructions for checking original ~
                  ,
,
                        t
".
                                                                                      same ISAP requires procedures to have detailed instructions                                           ,
documentation for attributes which were inaccessible or
                      ,
'
' '
:
nonrecreatable during the physical inspections of these
i
instrument installations.
According to paragraph 4.1 of
ISAP No. VII.c Revision 0, documentation reviews will be
' '
-
utilized to supplement reinspections for attributes which
s
*
Pre nonrecreatable or inaccessible.
Paragraph 4.1.3 of the
)
same ISAP requires procedures to have detailed instructions
t
,
,
,
,
a
a
                '
i
i                                                                                                                                                                                            l
'
      >
>
                                                                                                                                                                                            ,
_
                                    _
,
                                g                                                                                                                                                      .
g
          ." e .                          .
.
                                              ,
'
                                                                                                                '
." e
                                                                                                                                                                                ,
,
,
.
.


          _.
_.
                ,     .
,
  3
.
                            '
3
h
h
'
e i <
.
.
    e i <
<
                              <
)
)                  .
.
j.                                                            -27-
-27-
j.
!~
!~
                                            for the document reviewers.   QI-013, Revision 4, " Documentation.
for the document reviewers.
                                            Review for Instrumentation Equip R-E-ININ," did not list
QI-013, Revision 4, " Documentation.
                                            specific attributes to be verified during documentation
Review for Instrumentation Equip R-E-ININ," did not list
                                            review, but rather required verification of installation in
specific attributes to be verified during documentation
                                            accordance with one or more of a listing of TUGC0 procedures.
review, but rather required verification of installation in
                                            Applicable procedure revisions were not defined. The
accordance with one or more of a listing of TUGC0 procedures.
                                            number of inaccessible and/or nonrecreatable attributes may
Applicable procedure revisions were not defined.
                                            vary between different revisions of a procedure. As an
The
                                            example, Revision 1 of QI-QP-11.8-8 adds to Revision 0
number of inaccessible and/or nonrecreatable attributes may
                                            requirements an inspection checklist addressing verification
vary between different revisions of a procedure.
                                            of: (i) color codes for nuts; (ii) flange face cleanliness;
As an
                                            (iii) gasket size, rating, and material type; (iv) nuts
example, Revision 1 of QI-QP-11.8-8 adds to Revision 0
                                            being tightened in a diametrically opposite sequence; (v)
requirements an inspection checklist addressing verification
                                            studs being the sane length; (vi) proper alignment and
of: (i) color codes for nuts; (ii) flange face cleanliness;
                                            fitup of flange and gasket; and (vii) sufficient gasket
(iii) gasket size, rating, and material type; (iv) nuts
                                            compression.   The absence of instructions to the document
being tightened in a diametrically opposite sequence; (v)
                                            reviewer on procedure revisions to be used can thus result
studs being the sane length; (vi) proper alignment and
                                            in insufficient guidance with respect to inaccessible and
fitup of flange and gasket; and (vii) sufficient gasket
                                            nonrecreatable attributes. This is an NRC deviation
compression.
                                            (445/8514-D-02).
The absence of instructions to the document
reviewer on procedure revisions to be used can thus result
in insufficient guidance with respect to inaccessible and
nonrecreatable attributes.
This is an NRC deviation
(445/8514-D-02).
'
'
                                    ~(b)   In the review of Verification Package No. R-E-INIh-060, the
~(b)
                                            NRC inspector noted that the original inspection was
In the review of Verification Package No. R-E-INIh-060, the
                                            performed by a TUGC0 inspector whose certification to
NRC inspector noted that the original inspection was
                                            QI-QP-11.8-7 could not be verified. TUGC0 is currently
performed by a TUGC0 inspector whose certification to
                                            investigating the missing certification documents. This
QI-QP-11.8-7 could not be verified.
                                            matter is an unresolved item (445/8514-U-19).
TUGC0 is currently
                                (5) Independent reinspections were performed by the NRC inspector on
investigating the missing certification documents.
                                      Verification Package Nos. I-E-ININ-04 and I-E-ININ-026, with the
This
                                      following results:
matter is an unresolved item (445/8514-U-19).
                                      I-E-ININ-04: Required bend radius verification was not
(5) Independent reinspections were performed by the NRC inspector on
                                      performed by ERC inspectors.
Verification Package Nos. I-E-ININ-04 and I-E-ININ-026, with the
        *
following results:
                                      I-E-ININ-026: ERC inspectors did not idantify that: (a)
I-E-ININ-04:
                                      required color coding on six sections was missing, (b) incorrect
Required bend radius verification was not
                                      slope was present, and (c) an incorrect air gap condition was
performed by ERC inspectors.
                        .             present.
I-E-ININ-026:
H                                     The failure of ERC inspectors to identify the above conditions
ERC inspectors did not idantify that: (a)
                                      is an NRC deviation (445/8514-D-04).
*
                          f.   HVAC Ducts and Plenums
required color coding on six sections was missing, (b) incorrect
                  .
slope was present, and (c) an incorrect air gap condition was
                                Status of CPRT Activity
present.
                                As of October 25, 1985, reinspections have been completed for 62 of
.
                                95 random items in the HVAC ducts and plenums samples.       The
H
              <                                                                                                 ~
The failure of ERC inspectors to identify the above conditions
s                                                                                                                 ____m
is an NRC deviation (445/8514-D-04).
f.
HVAC Ducts and Plenums
.
Status of CPRT Activity
As of October 25, 1985, reinspections have been completed for 62 of
95 random items in the HVAC ducts and plenums samples.
The
<
~
s
-
m


                                  .                                                         -   ..
_ _ .-
          _ _ .-
.
    ,
-
        *
..
  ,
*
                                                            '
,
                                                    -28-
,
                      reinspections have identified conditions which necessitated the
'
                      issuance of 75 ors, 38 of which have been validated.     Twelve DRs have
-28-
                      been ovaluatea by ERC and were found to be'nonsafety significant. A
reinspections have identified conditions which necessitated the
                      number of deviations dealt with companion angle welds and include
issuance of 75 ors, 38 of which have been validated.
                      insufficient weld length,' undersized welds, excessive stitch weld
Twelve DRs have
                      spacing, weld cracks, and incomplete weld fusion. Other deviations
been ovaluatea by ERC and were found to be'nonsafety significant.
                      involved seal weld undercuts, lack of full face connecting
A
                      flange / gasket contact, level 3 flanged joint installed instead of the
number of deviations dealt with companion angle welds and include
                      specified level 2 (as defined by G&H specification 2323-MS-85), loose
insufficient weld length,' undersized welds, excessive stitch weld
                      vent lock caps, level 2 construction instead of the specified level 3,
spacing, weld cracks, and incomplete weld fusion. Other deviations
                      lock washers not installed on vent lock mounting screws, deteriorating
involved seal weld undercuts, lack of full face connecting
                      connecting flange gasket, and seal weld not touched up with paint.       .
flange / gasket contact, level 3 flanged joint installed instead of the
!                     Status of NRC Inspection Activity
specified level 2 (as defined by G&H specification 2323-MS-85), loose
                      (1) ERC methods and related documents used in establishing the
vent lock caps, level 2 construction instead of the specified level 3,
                -
lock washers not installed on vent lock mounting screws, deteriorating
                            population items list were reviewed for population
connecting flange gasket, and seal weld not touched up with paint.
                              inclusiveness. Completed SSE reports are cur *ently being
.
                            reviewed by the NRC inspector. As of October 25, 1985, eight
!
                    ,
Status of NRC Inspection Activity
                            reinspections have been witnessed by the NRC inspector, of which
(1) ERC methods and related documents used in establishing the
                            the following four were witnessed during this report period and
population items list were reviewed for population
                            are listed below by Verification Package No.:
-
                            Verification Package No.                        r No.
inclusiveness.
                                                                            Ur,t
Completed SSE reports are cur *ently being
                            'I-M-DU'.-021                                     1
reviewed by the NRC inspector.
                              I-M-DUPL-073                                     1
As of October 25, 1985, eight
reinspections have been witnessed by the NRC inspector, of which
,
the following four were witnessed during this report period and
are listed below by Verification Package No.:
Verification Package No.
Ur,t No.
r
'I-M-DU'.-021
1
I-M-DUPL-073
1
;
;
                              I-M-DUPL-084                                     2
I-M-DUPL-084
                              I-M-DUPL-086                                     1
2
                      (2) During the'above reinspections, ERC identified the following
I-M-DUPL-086
                            conditions to the NRC inspector as subject to evaluation as
1
  '
(2) During the'above reinspections, ERC identified the following
                            potential deviations:
conditions to the NRC inspector as subject to evaluation as
                              I-M-DUPL-021:   Some duct connecting flange bolts were bent. No
potential deviations:
                  -
'
                            corner welds existed on duct connecting flanges and a connecting
I-M-DUPL-021:
                              flange bolt hole was excessively large.
Some duct connecting flange bolts were bent.
      ,                      I-M-DUPL-073: All vent lock caps were loose and companion angle
No
                            bolt hole center-to-center distance was excessive on both ends
corner welds existed on duct connecting flanges and a connecting
                            of the duct section.
-
                              I-M-DUPL-084:   Duct connecting flange corner weld lengths were
flange bolt hole was excessively large.
                              less than the specified dimension.
I-M-DUPL-073:
                                                          -
All vent lock caps were loose and companion angle
,
bolt hole center-to-center distance was excessive on both ends
of the duct section.
I-M-DUPL-084:
Duct connecting flange corner weld lengths were
less than the specified dimension.
-


                                                        .
-
        -
- __
                                - __     -
-
                              ^
.
                  ,
^
      ,
,
            s
,
              .
-29-
                                                                    -29-
s
                                            I-M-DUPL-086:   Approximately 4 inches of duct seam were not
.
                                            welded.
I-M-DUPL-086:
                                            Dispositions of the above findings are open items (445/8514-0-18
Approximately 4 inches of duct seam were not
                    ,
welded.
                                            and 445/8514-0-19, 446/8511-0-03, and 445/8514-0-20).
Dispositions of the above findings are open items (445/8514-0-18
    ,
and 445/8514-0-19, 446/8511-0-03, and 445/8514-0-20).
                                      (3) The following potential out-of-scope deviation was also
,
          ,
                                            < identified by ERC:
      .
                        .
                                              I-M-DUPL-073:  An additional hole was drilled in the companion
              ''
                                            angle flange and this hole was partially filled with sealant.
                                            Disposition of the above finding is an open item
                                            (445/8514-0-21).
                                      (4) For all witnessed reinspections, the ERC inspector did not
                                            measure duct gage thickness which was a required attribute.      The
                                            NRC inspector was informed by ERC that such measurements were
                                            not possible due to inaccessibility to the inside of the duct.
,
,
                                            The NRC inspector concurred with this position.
(3) The following potential out-of-scope deviation was also
                                      No NRC violations or deviations were identified.
< identified by ERC:
                          g.         HVAC Equipment Installation
,
  ,
I-M-DUPL-073:
                                      Ststus of CPRT Act*vity
An additional hole was drilled in the companion
                                      As of October 25, 1985, reinspe-tions have been completed for 38 of
.
                                      89 random items in the HVAC equ v.t.ent installation samples. The
.
                                      reinspections have identified conditions which necessitated the
angle flange and this hole was partially filled with sealant.
                                      issuance of 68 DRs, none of which have been currently vr.lidated.
''
                                      Reinspection was on hold for approximately one week, pending a change
Disposition of the above finding is an open item
                                      notice.to QI-023, Revision O. This change notice involved changes in
(445/8514-0-21).
                                    . the following areas: (1) the method of verifying companion flange
(4) For all witnessed reinspections, the ERC inspector did not
                                      bolt tightness and gasket compression, (2) inclusion of verification
measure duct gage thickness which was a required attribute.
                                      of full thread engagement between companion flange bolts and nuts,
The
                                      (3) companion flange bolt centerline to flange edge distance
NRC inspector was informed by ERC that such measurements were
                                      requirements, and (4) the mtthod of certification of gravity damper
not possible due to inaccessibility to the inside of the duct.
                                      counterweighc balance.     Previously reinspected items will require a
The NRC inspector concurred with this position.
                                      followup reinspection, where apslicable, as a result of this
,
                                      revision.
No NRC violations or deviations were identified.
                                      The NRC inspector was informed by the ?opulation en0i neer that the
g.
                                      HVAC equipment installation plan will be revised to incorporate two
HVAC Equipment Installation
;                                      distinct populations, each requiring a minimum sample size of 60.
Ststus of CPRT Act*vity
l                      .              One population will include all HVAC equipment installed by Bihnson
,
                                      Services. Inc., while the others will include all HVAC equipment
As of October 25, 1985, reinspe-tions have been completed for 38 of
                                      installed by B&R. This change will not necessarily invalidate any
89 random items in the HVAC equ v.t.ent installation samples.
The
reinspections have identified conditions which necessitated the
issuance of 68 DRs, none of which have been currently vr.lidated.
Reinspection was on hold for approximately one week, pending a change
notice.to QI-023, Revision O.
This change notice involved changes in
. the following areas: (1) the method of verifying companion flange
bolt tightness and gasket compression, (2) inclusion of verification
of full thread engagement between companion flange bolts and nuts,
(3) companion flange bolt centerline to flange edge distance
requirements, and (4) the mtthod of certification of gravity damper
counterweighc balance.
Previously reinspected items will require a
followup reinspection, where apslicable, as a result of this
revision.
The NRC inspector was informed by the ?opulation en0 neer that the
i
HVAC equipment installation plan will be revised to incorporate two
distinct populations, each requiring a minimum sample size of 60.
;
;
                                                                                                                  o
l
                e
One population will include all HVAC equipment installed by Bihnson
                                                                                                                    1
.
Services. Inc., while the others will include all HVAC equipment
installed by B&R.
This change will not necessarily invalidate any
;
o
e
1


    y= .-                  -      .
y=
                                                        .- .     _
.-
                                                                                    -
+'
-
-
                                        -30-
.
  ,
.- .
          reinspections conducted to date, but could effectively double the
_
          total number of items to be reinspected in the initial sample.
-
          Status of NRC Inspection Activity
+ '
          (1) As of October 25, 1985, a total of four reinspections have been
-30-
                witnessed by the NRC inspector, all of which were witnessed
-
                during this report period and are listed below:
,
                Verification Package No.                           Unit No.
reinspections conducted to date, but could effectively double the
                I-M-HVIN-017                                         1
total number of items to be reinspected in the initial sample.
                I-M-HVIN-038                                       2
Status of NRC Inspection Activity
                I-M-HVIN-040                                         1
(1) As of October 25, 1985, a total of four reinspections have been
                I-M-HVIN-043                                         1
witnessed by the NRC inspector, all of which were witnessed
          (2) During the above reinspections, ERC' identified the following
during this report period and are listed below:
                conditions to the NRC inspector as subject to evaluatien.as
Verification Package No.
  .            potential deviations:
Unit No.
                I-M-HVIN-017 (Filter): Three bolts on the. inlet duct connection
I-M-HVIN-017
                did not have lock washers installed.
1
                I-M-HVIN-038 (Fan): (a) The exhaust flange gasket did not cover
I-M-HVIN-038
                .the entire flange area, (b) the gasket was also unevenly
2
                compressed, and (c) some lockwashers on exhaust connecting
I-M-HVIN-040
                flange bolts did not have full contact with the flange. Similar
1
                conditions were identified by the ERC inspector for the inlet
I-M-HVIN-043
                duct connection.
1
                I-M-HVIN-040 (Fan): (a) Inlet and c,utlet duct connection gaskets
(2) During the above reinspections, ERC' identified the following
                had low and uneven compression, (b) diameters for foundation
conditions to the NRC inspector as subject to evaluatien.as
                anchor bolts and duct connection bolts were 11'iegible in
potential deviations:
                drawings provided in the inspection package, and (c) exhaust
.
                duct connection bolts did not have full thread engagement with
I-M-HVIN-017 (Filter):
                r.uts .
Three bolts on the. inlet duct connection
                I-M-HVIN-043 (Motor Operated Dawer):       (a) A nameplate was not
did not have lock washers installed.
                observed on the equipment, and (b) the actuator spring could not
I-M-HVIN-038 (Fan): (a) The exhaust flange gasket did not cover
                be located which is required for vertfication of fail closed or
.the entire flange area, (b) the gasket was also unevenly
                fail open positions.
compressed, and (c) some lockwashers on exhaust connecting
                Dispositions of the above findings are open items
flange bolts did not have full contact with the flange.
                (445/8514-0-22, 446/8511-0-0A, 445/8514-0-23 and 445/8514-0-24).
Similar
          (3) The following potential out-of-scope deviation was also
conditions were identified by the ERC inspector for the inlet
                identified by ERC-
duct connection.
                                                                                      l
I-M-HVIN-040 (Fan): (a) Inlet and c,utlet duct connection gaskets
                                                                                      l
had low and uneven compression, (b) diameters for foundation
                                                                                      l
anchor bolts and duct connection bolts were 11'iegible in
                                                                                      i
drawings provided in the inspection package, and (c) exhaust
                                                                                      ,
duct connection bolts did not have full thread engagement with
r.uts .
I-M-HVIN-043 (Motor Operated Dawer):
(a) A nameplate was not
observed on the equipment, and (b) the actuator spring could not
be located which is required for vertfication of fail closed or
fail open positions.
Dispositions of the above findings are open items
(445/8514-0-22, 446/8511-0-0A, 445/8514-0-23 and 445/8514-0-24).
(3) The following potential out-of-scope deviation was also
identified by ERC-
l
i
,


          _-
m.
m.                                   _ _ _   _           -- .     _.
_ _ _
                                                                              -
_
                                                                                _        _
-- .
                                                                                                      ,
_.
                                                                                                        ,
_
    j ,
_
                                                                                                        !
,
                                                                                                        l
_-
                                                                                                        !
j
                                                -31-
-
                                                                                                        I
,
                                                                                                        .
,
                        I-N-HVIN-043:     Some of the bolts attaching the actuator to the
l
                        mounting bracket did not have full thread engagement.
-31-
                                                                                                        '
.
        .
I-N-HVIN-043:
                        Disposition of the above finding is an open item
Some of the bolts attaching the actuator to the
                        (445/8514-0-25).
mounting bracket did not have full thread engagement.
'
.
Disposition of the above finding is an open item
(445/8514-0-25).
No NRC violations or deviations were identified.
'
;
;
                '
h.
                  No NRC violations or deviations were identified.
Large Bore Piping Configuration
              h.  Large Bore Piping Configuration
Status of CPRT Activity
                  Status of CPRT Activity
As of October 25, 1985, reinspection was complete for 65 of the 99
                  As of October 25, 1985, reinspection was complete for 65 of the 99
random sample large bore piping configuration items. The
                  random sample large bore piping configuration items. The
reinspections identified conditions which resulted in the issuance of
                  reinspections identified conditions which resulted in the issuance of
34 DRs,18 of which, to date, have been validated and are undergoitig
                  34 DRs,18 of which, to date, have been validated and are undergoitig
an evaluation by ERC for safety significance.
                  an evaluation by ERC for safety significance.
Tiie NRC inspector was informed by the population engineer that the
                  Tiie NRC inspector was informed by the population engineer that the
population items list is currently being revised to exclude all items
                  population items list is currently being revised to exclude all items
not having an "N-5" designation on the piping isometric drawings.
                  not having an "N-5" designation on the piping isometric drawings.
One exception will be certain safety-related piping in Unit 1 that
                  One exception will be certain safety-related piping in Unit 1 that                 4
4
                  has been exempted from "NA" code stamping requirements.
has been exempted from "NA" code stamping requirements.
                  The NRC inspector was informed that the above' described revision to
The NRC inspector was informed that the above' described revision to
                  the population items list is required in order to ensure that all
the population items list is required in order to ensure that all
                  CPRT reinspection items had been previously inspected and accepted by
CPRT reinspection items had been previously inspected and accepted by
                  construction QC. Approximately 24 previously reinspected items will
construction QC.
            i
Approximately 24 previously reinspected items will
                  be excluded from the reinspection samples as a result of this
be excluded from the reinspection samples as a result of this
                  revision.
i
                  Deviations have involved incorrect flow direction orientation of an
revision.
                  orifice plate, insufficient clearance with adjacent piping and
Deviations have involved incorrect flow direction orientation of an
                  equipment, a different part number on a valve to that shown on the
orifice plate, insufficient clearance with adjacent piping and
                  isometric drawing, linear and location measurement differences,
equipment, a different part number on a valve to that shown on the
                  insufficient sleeve clearances, missing code data plate, and flow
isometric drawing, linear and location measurement differences,
                  direction not marked on the valve.
insufficient sleeve clearances, missing code data plate, and flow
                  Status of NRC Inspection Activity
direction not marked on the valve.
                  ERC methods and related documents used in establishing the population
Status of NRC Inspection Activity
                  items list were reviewed for population inclusiveness. Completed S$F
ERC methods and related documents used in establishing the population
                  reports are currently being reviewed by the NRC inspector. As of -
items list were reviewed for population inclusiveness.
                  October 25, 1985, four reinspections have been witnessed by the NRC
Completed S$F
                  inspector, with the following verification package reinspection being
reports are currently being reviewed by the NRC inspector.
                  witnessed during this report period:                                             )
As of -
                                                                                                    i
October 25, 1985, four reinspections have been witnessed by the NRC
      !
inspector, with the following verification package reinspection being
  ,
witnessed during this report period:
                                                            -
)
                                                                              -            --]
i
                                                                                              _. ..
!
-
-
--]
,
_. ..


                                                                                  -
      ,          _
                          _ -                          _
                                                              -
                              '
          ,
        '
                                                        -32-
        ,
                      I-M-lGCO-113 (Unit 2): During this reinspection, ERC identified one
                        -
                                                                                                          .
                      coiidition as subject to evaluation as a potential deviation, f.e. ,
                      flanges tflat were identified as orifice flanges on the isometric
                      drawing did not have an identification tag or flow direction
                      indication.
                      Disposition of the above finding is an open item (446/8511-0-05).
                      No NRC violations or deviations were identified.
              1.    _ Piping Syster Bolted Joints / Materials
                      ERC has completed 73 reinspections of piping system bolted
                      joints /naterials as of October 26, 1985. However, on eight of these
                      reinspe.ctions the attribute dealing with flange rating could not be
                      inspected because the flange was painted. The paint will be scraped
                      off the eight flanges, thus allowing this attribute to be
                      reinspected,
                      ERC has also completed document reviews on 14 of the 73 packages.
                      The 73 packages represent 100% of the combined random and engineering
                      samples.
                      Status of NRC Intpection Activity
                      (1) The following ERC reinspecticn was independently inspected by
                              the NRC inspector:
                              Verification Package No. Drawing No.            Flange lio. Unit No.
                              I-M-PB0H-34                  BRP-SI-1-R8-048        1            1
                              With respect to the above inspection, the flRC inspector
                              concurred with the ERC inspector's finding that the flange type
                              was not hardstamped on'the flange as required by the inspect 1on
                              procedure, and that this condition is subject to evaluation as a
    s                        potential deviation.      Suosequently, the Inspection procedure was
                              revised to allow inspectors to visually identify the type of
                              flange ir    4
                                              's tmt hardstamped with such information.      The
,
,
                              above pill be reinigt'"1 hv           +nr this particular attribute.
_
_ -
_
-
-
'
,
-32-
'
,
I-M-lGCO-113 (Unit 2):
During this reinspection, ERC identified one
coiidition as subject to evaluation as a potential deviation, f.e. ,
.
-
flanges tflat were identified as orifice flanges on the isometric
drawing did not have an identification tag or flow direction
indication.
Disposition of the above finding is an open item (446/8511-0-05).
No NRC violations or deviations were identified.
1.
_ Piping Syster Bolted Joints / Materials
ERC has completed 73 reinspections of piping system bolted
joints /naterials as of October 26, 1985.
However, on eight of these
reinspe.ctions the attribute dealing with flange rating could not be
inspected because the flange was painted.
The paint will be scraped
off the eight flanges, thus allowing this attribute to be
reinspected,
ERC has also completed document reviews on 14 of the 73 packages.
The 73 packages represent 100% of the combined random and engineering
samples.
Status of NRC Intpection Activity
(1) The following ERC reinspecticn was independently inspected by
the NRC inspector:
Verification Package No. Drawing No.
Flange lio. Unit No.
I-M-PB0H-34
BRP-SI-1-R8-048
1
1
With respect to the above inspection, the flRC inspector
concurred with the ERC inspector's finding that the flange type
was not hardstamped on'the flange as required by the inspect 1on
procedure, and that this condition is subject to evaluation as a
potential deviation.
Suosequently, the Inspection procedure was
s
revised to allow inspectors to visually identify the type of
flange ir
4
's tmt hardstamped with such information.
The
,
above pill be reinigt'"1 hv
+nr this particular attribute.
t
t
                              No W     .iolations or 9         m  were mont
No W
                      O) The following conditi m wi               were idntiflini uy itC in
.iolations or 9
                              Septenc er as subject to eva:. af.lon as potential deviatiotu           s1
were mont
                              DRs o .tten for them: (a) I-M-P80M-46 - Flange W. J (Pra m g
m
f                             BRP W 1-$8-003) ha : a loose not, and (b) 1-WPB0.+             5lange
O) The following conditi m wi
  k   -
were idntiflini uy itC in
            _    _--             %             -
Septenc er as subject to eva:. af.lon as potential deviatiotu
                                                    ._   ,-     +         m
s1
                                                                                          -
DRs o .tten for them: (a) I-M-P80M-46 - Flange W.
                                                                                                  - -
J (Pra m g
                                                                                                        -
f
BRP W 1-$8-003) ha : a loose not, and (b) 1-WPB0.+
5lange
k
-
_--
%
_
-
._
,-
+
m
-
- -
-
_


    *
*
  .
.
                                      -33-                                   ,
-33-
              No. 3 (Dra.ving BRP-CH-1-EC-0048) had two studs without the
,
              required one thread past the outer face of the nut.
No. 3 (Dra.ving BRP-CH-1-EC-0048) had two studs without the
              Existing open items for these subjects (i.e., 445/8513-0-21 and
required one thread past the outer face of the nut.
              445/8513-0-22) will remain open pending review of the
Existing open items for these subjects (i.e., 445/8513-0-21 and
              applicant's completed disposition.
445/8513-0-22) will remain open pending review of the
              No flRC violations or deviations were identified.
applicant's completed disposition.
      j. Small Bore Piping and Instrumntation Tube Welds /K1terial
No flRC violations or deviations were identified.
        Status of CPRT Activity
j.
        Reinspection is in progress of small bore pipe and instrumentation
Small Bore Piping and Instrumntation Tube Welds /K1terial
        ;ub : welds and material present in a random sample of 60 weids from
Status of CPRT Activity
        Units 1 and 2. Forty-four small bore pipe and instrumentation tubing
Reinspection is in progress of small bore pipe and instrumentation
        welds have been visusily reinspected. Base riaterial heat codes and
;ub : welds and material present in a random sample of 60 weids from
        welder identifications have been recorded and are undergoing
Units 1 and 2.
        docurentation review. No deviations have been found.
Forty-four small bore pipe and instrumentation tubing
        Stat.us of NRC Inspection Activity
welds have been visusily reinspected.
        The following seven reinspections of snall-bore piping welds were
Base riaterial heat codes and
        witnessed by the NRC inspector:
welder identifications have been recorded and are undergoing
        1erification Package No. Pipe No. & Weld No.             DRP No.
docurentation review. No deviations have been found.
        I-M-SBWM-016               CH-2-216-152-3, Wold 11       CH-2-SB-009
Stat.us of NRC Inspection Activity
        I-H-SBWM-003               SW 2-368-105-3, Weld 23A     SW-2-AB-027
The following seven reinspections of snall-bore piping welds were
        I-H-58 4 013               CC-2-064-152-3, Weld 1-1       CC-2 SB-002
witnessed by the NRC inspector:
        I-P-SBWM-040               C'i-1-220- 152-3 , Weld 37-2 CH-1-SB-024
1erification Package No. Pipe No. & Weld No.
        I-H-5BWM-076               C5-1-905-250-R2, Weld 18       CS-1-RB-013
DRP No.
        I-H-SBWM-054               CT-1-127-901-R2, Weld 56     CT-1-RB-031
I-M-SBWM-016
        1-H-SBWM-057               CT-1-127-301-R2 Weld 43       CT-1-RB-031
CH-2-216-152-3, Wold 11
        No conditions subject tu evaluation as potential deviations were
CH-2-SB-009
        identified by ERC to the NRC inspector.
I-H-SBWM-003
        No NRC violations or deviations were identified.
SW 2-368-105-3, Weld 23A
      k. targe Bore Pipir.g Welds / Material
SW-2-AB-027
;       Status of CPRT Activity
I-H-58 4 013
CC-2-064-152-3, Weld 1-1
CC-2 SB-002
I-P-SBWM-040
C'i-1-220- 152-3 , Weld 37-2
CH-1-SB-024
I-H-5BWM-076
C5-1-905-250-R2, Weld 18
CS-1-RB-013
I-H-SBWM-054
CT-1-127-901-R2, Weld 56
CT-1-RB-031
1-H-SBWM-057
CT-1-127-301-R2 Weld 43
CT-1-RB-031
No conditions subject tu evaluation as potential deviations were
identified by ERC to the NRC inspector.
No NRC violations or deviations were identified.
k.
targe Bore Pipir.g Welds / Material
;
Status of CPRT Activity
l
l
Visual reinspection is in progress of a random sample of 60 ASME
l
l
l        Visual reinspection is in progress of a random sample of 60 ASME
Section !!I large bore pipin0 welds and material from Units 1 and 2.
l        Section !!I large bore pipin0 welds and material from Units 1 and 2.
To date, 35 1arge bore piping velds have been reinspected. One
        To date, 35 1arge bore piping velds have been reinspected. One
deviation has been identified which is currently being evaluated for
        deviation has been identified which is currently being evaluated for
validity and safety significance by ERC.
        validity and safety significance by ERC.
,
                                                                              ,
_
. -
. .
.
.
.
. .
.
.
.
.
. .
.
.
.
.


.o.
.
.
'.
              '.-
-
                      '                                                                                                                    -
.o.
      r                                                                                                                                               ,
'
,+                                                                                                                                               ,
-
Ikl                     1
r
                                                            -34-                                                                                   .
,
                                                                                                                                                  '
,+
                                                                                                                                                '
,
            *
Ikl
                              Status of NRC Inspection Activity                                                                       ,
1
              -
-34-
                            '
.
                              As of October 25, 1985, the-following eight reinspections of sampled
'
                  ,.
Status of NRC Inspection Activity
                              large_ bore piping welds were? witnessed by the NRC inspector:
'
                              Verification Package No. Pipe No. & Weld No.                                                                   ,
*
                                                                                                                                                  BRP.'No.
,
                                                                                                                                                              ~
-
                              I-M-LBWM-003               CS-2-250-301-R-3, Weld 6                                                                 CS-2-SB-020
As of October 25, 1985, the-following eight reinspections of sampled
                              I-M-LBWM-009               CS-2-309-301-R-3, Weld 8                                                                 CS-2-SB-030
'
                          ,
large_ bore piping welds were? witnessed by the NRC inspector:
                              I-M-LBWM-026               BR-X-056-151-R-3, Weld 7                                                                 BR-X-AB-048
,.
                              I-M-LBWM-030               0D-1-18-151-3, Weld 16-1                                                                 00-1-AB-013
Verification Package No. Pipe No. & Weld No.
                              I-M-LBWM-084               FW-2-102-1303-2, Weld 1-3                                                               FW-2-RB-022-
BRP.'No.
                              I-M-LBWM-078               CC-2-271-152-3, Weld 31                                                                   CC-2-RB-53
,
                              I-M-LBWM-001               CC-2-302-301-R3, Weld 7A'                                                                 CS-2-AB-032
~
                              I-M-LBWM-060               CS-2-026-301-R3, Weld 11                                                                 CS-2-AB-065
I-M-LBWM-003
                              No conditions subject to evaluation as potential deviations were
CS-2-250-301-R-3, Weld 6
                              identified by ERC to the NRC inspector.
CS-2-SB-020
~
I-M-LBWM-009
                ,
CS-2-309-301-R-3, Weld 8
                              No NRC violations or deviations were identified.
CS-2-SB-030
                            1. Large Bore Pipe Supports - Rigid
I-M-LBWM-026
                              Status of CPRT Activity
BR-X-056-151-R-3, Weld 7
                              Reinspection / verification of pipe support installations by ERC is
BR-X-AB-048
                              approximately 94% complete.                     A total of 151 deviations have been
,
                              identified of which 98 have been determined to be valid. The
I-M-LBWM-030
                              remainder are currently being reviewed for validity.
0D-1-18-151-3, Weld 16-1
                              Status of NRC Inspection Activity
00-1-AB-013
                              (1) The NRC inspector performed independent inspections on pipe
I-M-LBWM-084
                                    support Verification Package Nos. I-S-LBSR-013-and -023, in
FW-2-102-1303-2, Weld 1-3
                                    order to assess the adequacy of the ERC reinspections. The ERC
FW-2-RB-022-
    .                              -reinspection of pipe support Verification Package No.
I-M-LBWM-078
                                    I-S-LBSR-013 was determined to be adequate, accurate, and
CC-2-271-152-3, Weld 31
                                    complete. However, during the independent inspection of
CC-2-RB-53
                                    I-S-LBSR-023, one deviation from a commitment was identified
I-M-LBWM-001
                                    with respect to failure to identify discrepant dimensions.
CC-2-302-301-R3, Weld 7A'
                                    Paragraph 5.3.4.c in QI-027 states with respect to dimensional
CS-2-AB-032
                                    tolerances not shown on design drawings, " Component Member-
I-M-LBWM-060
      ,                            Length +/- 1/2 inch." The Bill of Material on Revisicn 2 of                                                                         '
CS-2-026-301-R3, Weld 11
                                    drawing No. CT-1-097-402-C52R lists item No. 4 (2 pieces) as
CS-2-AB-065
  .
No conditions subject to evaluation as potential deviations were
        , ~
identified by ERC to the NRC inspector.
                                    being 7 3/4 inches long. Independent NRC inspection determined
No NRC violations or deviations were identified.
                                    the actual length dimensions to be, respectively, 6'5/8 inches
~
                                    and 6 1/2 inches, both of.which are under the minimum indicated
,
            ,e.                     dimension of 7 1/4 inches (445/8514-0-04).
1.
                                                                                                                                                            4
Large Bore Pipe Supports - Rigid
                                                                                                                                                                \
Status of CPRT Activity
                                                                                                                                          >
Reinspection / verification of pipe support installations by ERC is
                                                                                                                                          4
approximately 94% complete.
                                                                          4
A total of 151 deviations have been
                                                            _ . _ _ . _ _ . , - . _ _ _ _ _ _ _ - . . - - _ . _ _ _ _ _ _ _ _ _ _ . - - _               _______-------A
identified of which 98 have been determined to be valid.
The
remainder are currently being reviewed for validity.
Status of NRC Inspection Activity
(1) The NRC inspector performed independent inspections on pipe
support Verification Package Nos. I-S-LBSR-013-and -023, in
order to assess the adequacy of the ERC reinspections.
The ERC
-reinspection of pipe support Verification Package No.
.
I-S-LBSR-013 was determined to be adequate, accurate, and
complete. However, during the independent inspection of
I-S-LBSR-023, one deviation from a commitment was identified
with respect to failure to identify discrepant dimensions.
Paragraph 5.3.4.c in QI-027 states with respect to dimensional
tolerances not shown on design drawings, " Component Member-
Length +/- 1/2 inch." The Bill of Material on Revisicn 2 of
'
,
drawing No. CT-1-097-402-C52R lists item No. 4 (2 pieces) as
, ~
being 7 3/4 inches long.
Independent NRC inspection determined
.
the actual length dimensions to be, respectively, 6'5/8 inches
and 6 1/2 inches, both of.which are under the minimum indicated
,e.
dimension of 7 1/4 inches (445/8514-0-04).
4
\\
>
4
4
_ . _ _ . _ _ . , - . _ _ _ _ _ _ _ - . . - - _ . _ _ _ _ _ _ _ _ _ _ . - - _
-------A


(,     .
(,
                                                                                                                              ,
.
  ,
,
                                                                                                                      -35-
-35-
                                                                (2) During inspection of the installation of box frame supports,
,
j                                                                                             which are a part of the Unit 1 containment spray system, t' e NRC
(2) During inspection of the installation of box frame supports,
j
which are a part of the Unit 1 containment spray system, t' e NRC
'
'
                                                                                              inspector observed that clearances exist between the botton: of
inspector observed that clearances exist between the botton: of
                                                                                              the pipe and the pipe support, and in some cases no clearance
the pipe and the pipe support, and in some cases no clearance
                                                                                              exists between the top of the pipe and pipe support. The TUGC0
exists between the top of the pipe and pipe support.
                                                                                              Engineering as-built piping verification supervisor was
The TUGC0
                                                                                              contacted about the conflict between the as-built drawings for
Engineering as-built piping verification supervisor was
                                                                                              these supports and the actual field configuration. The TUGC0
contacted about the conflict between the as-built drawings for
these supports and the actual field configuration.
The TUGC0
Engineering supervisor stated that their as-built piping
,
configuration program, TNE-DC-24-1, satisfies the requirements
of NRC Bulletin 79-14 and that the as-built configuration
,
!.
complied with installation tolerances.
The conditions
identified above increase loading on adjacent pipe supports and
increase stresses on the piping system.
The conditions listed
,
'
above are being referred to NRR for consideration when
determining the accuracy and adequacy of Stone and Webster-
,
Engineering Corporation's stress analysis program for the
applicable design specific action plan.
m.
Large Bore Pipe Supports - Non-Rigid
,
,
                                                                                              Engineering supervisor stated that their as-built piping
                                                                                              configuration program, TNE-DC-24-1, satisfies the requirements
        ,                                                                                    of NRC Bulletin 79-14 and that the as-built configuration
!.                                                                                            complied with installation tolerances. The conditions
                                                                                              identified above increase loading on adjacent pipe supports and
,
                                                                                              increase stresses on the piping system. The conditions listed
                                                                                              above are being referred to NRR for consideration when
'
      ,                                                                                      determining the accuracy and adequacy of Stone and Webster-
                                                                                              Engineering Corporation's stress analysis program for the
                                                                                              applicable design specific action plan.
    ,
                          m.                                    Large Bore Pipe Supports - Non-Rigid
!
!
                                                                Status of CPRT Activity
Status of CPRT Activity
                                                                Reinspection / verification of pipe support installations by ERC is
Reinspection / verification of pipe support installations by ERC is
                                                                approximately 88% complete.                           A total of 217 deviations have been
approximately 88% complete.
                                                                  identified of which, to.date, 162 have been determined to be valid.
A total of 217 deviations have been
                                                                Status of NRC Inspection Activity
identified of which, to.date, 162 have been determined to be valid.
                                                                (1) The NRC inspector witnessed ERC's reinspection of Verification
Status of NRC Inspection Activity
                                                                                              Package No. I-S-LBSN-249 to verify compliance with QI-029.
(1) The NRC inspector witnessed ERC's reinspection of Verification
                                                                                              During the inspection, ERC identified the following conditions
Package No. I-S-LBSN-249 to verify compliance with QI-029.
                                                                                              to the NRC inspector as subject to evaluation as potential
During the inspection, ERC identified the following conditions
                                                                                              deviations: (a) component member lengths out of tolerance, (b)
to the NRC inspector as subject to evaluation as potential
                                                                                              undersize welds, and (c) missing locking devices.
deviations: (a) component member lengths out of tolerance, (b)
                                                                                              Dispositions of the above items are an open item
undersize welds, and (c) missing locking devices.
                                                                                              (445/8514-0-26).
Dispositions of the above items are an open item
                                                                                              No NRC violations or deviations were identified.
(445/8514-0-26).
                                                                  (2) The NRC. inspector performed independent inspections on pipe
No NRC violations or deviations were identified.
                                                                                              support Verification Package Nos. I-S-LBSN-014, -025, -035, and
(2) The NRC. inspector performed independent inspections on pipe
                                                                                              -052, in order to assess the adequacy of the ERC reinspections.
support Verification Package Nos. I-S-LBSN-014, -025, -035, and
                                                                                              This effort revealed that ERC had performed their reinspections
-052, in order to assess the adequacy of the ERC reinspections.
                                                                                              in accordance with the requirements of QI-029.
This effort revealed that ERC had performed their reinspections
                                                                                              No NRC violations or deviations were identified.
in accordance with the requirements of QI-029.
No NRC violations or deviations were identified.
,
,
          _ _ _ _ . . - .   _ _ . _ . _ _ - . _ . _ _ _ - - _ _ _ - . _ _ _ . - _ _ - _ _ . .                                                             -_ - . . . _ . _
. . - .
.
.
- .
.
- -
- .
. -
-
. .
-
- . . .
.


  g.         . .                 . .                             .
g.
    1
.
                                F
. .
      a
.
                                        ,.
.
                                              ,      -36-
1
              '
F
                  ,
a
                                                                  -
-36-
                                          .
,
          ,
,.
                    n. - Small Bert Piping Configuration
'
,       .
-
                        Status of.CPRT Activity
,
                                                              '
.
,
n.
- Small Bert Piping Configuration
,
.
Status of.CPRT Activity
'
[e
[e
                                                        '
p'                      As aof October ;25,1985, reinspection was complete for 64 of 95 random
                        sample small bore pipin'g configuration items. The reinspections
'
'
                        identified conditions which resulted in the issuance of 45 DRs, 25 of
As aof October ;25,1985, reinspection was complete for 64 of 95 random
                        which were validated and are being evaluated by ERC for safety
p'
                        significance.             '
'
                                                                                                i
sample small bore pipin'g configuration items.
                                                I
The reinspections
                        The NRC inspector was informed by the population engineer that the
identified conditions which resulted in the issuance of 45 DRs, 25 of
                        population items list'is currently being revised.to exclude all items
which were validated and are being evaluated by ERC for safety
                        not having an "N-5" designation on the piping isometric drawings.
significance.
                        One exception will be certain safety related piping in Unit 1 that
'
                        has been exempted from "NA" code stamping requirements.
i
      '
I
                        The NRC inspector was informed that the above described revision to
The NRC inspector was informed by the population engineer that the
population items list'is currently being revised.to exclude all items
not having an "N-5" designation on the piping isometric drawings.
One exception will be certain safety related piping in Unit 1 that
has been exempted from "NA" code stamping requirements.
'
The NRC inspector was informed that the above described revision to
the population items list is required in order to ensure that all
~
,
,
    ~                    the population items list is required in order to ensure that all
CPRT reinspection items included those which had been previously
            '
'
                        CPRT reinspection items included those which had been previously
inspected and accepted by construction QC,
                        inspected and accepted by construction QC, Approximately 20
Approximately 20
                        previously reinspected items will be excluded from the reinspection
previously reinspected items will be excluded from the reinspection
                        samples as a result of this revision.
samples as a result of this revision.
                        Deviations have involved out of tolerance linear and location
Deviations have involved out of tolerance linear and location
                        measurements, incorrect valve flow direction orientation, inadequate
measurements, incorrect valve flow direction orientation, inadequate
                        clearances with adjacent piping and equipment, and the part number on
clearances with adjacent piping and equipment, and the part number on
                        a valve differing from that on the isometric drawing.
a valve differing from that on the isometric drawing.
                        Status of NRC Inspection Activity
Status of NRC Inspection Activity
                        (1) ERC methods.and related documents used in establishing the
(1) ERC methods.and related documents used in establishing the
                              population items list were reviewed for population
population items list were reviewed for population
                              inclusiveness. Completed SSE reports are currently being
inclusiveness.
                              reviewed by the NRC inspector. As of October 25, 1985, six
Completed SSE reports are currently being
                              reinspections have been witnessed by the NRC inspector, of which
reviewed by the NRC inspector.
            '
As of October 25, 1985, six
                              the following three were witnessed during~this report period:
reinspections have been witnessed by the NRC inspector, of which
                              Verification Package No.                         Unit No.
the following three were witnessed during~this report period:
                              I-M-SBC0-015                                       1
'
                              I-M-SBCO-061                                       1
Verification Package No.
                                                                                                  1
Unit No.
                              I-M-SBCO-079                                       2             l
I-M-SBC0-015
                                      .
1
                                            1
I-M-SBCO-061
                                                                          m
1
1
I-M-SBCO-079
2
l
.
1
m
-
.a.
-m---.
-
- - -
-
a
.-
--------------a-
- . - - -
- - - .
--*


  Y       :v -~
Y
              ''
:v -~
                  .
- - -
                                                                                          - - -   -- -   -
--
    .o   ~..                                                                                     ,
-
                .
-
      .
''
  i
.
  i.
.o
                                                      -37-
~ . .
                        (2) During the above reinspections, ERC identified the following
,
                              conditions to the NRC inspector as subject to evaluation as
.
                              potential deviations:
.
                              I-M-SBCO-061:   There was insufficient clearance with three
i
                              adjacent pipes and a linear dimension measurement was out of
i.
                              tolerance.
-37-
                              I-M-SBCO-079: Certain field survey elevation measurements were
(2) During the above reinspections, ERC identified the following
                              not the same as the elevations shown on the isometric drawing.
conditions to the NRC inspector as subject to evaluation as
                              Dispositions of the above findings are open items (445/8514-0-27
potential deviations:
                              and 446/8511-0-06).
I-M-SBCO-061:
                              No NRC violations or deviations were' identified.                             i
There was insufficient clearance with three
                                                                                                            ;
adjacent pipes and a linear dimension measurement was out of
                    o. HVAC Duct Supports
tolerance.
                        Status of CPRT Activity
I-M-SBCO-079:
                        Visual einspection of a random sample of 66 HVAC duct supports from
Certain field survey elevation measurements were
                        Units 1, 2, and common is in process. Twenty-five HVAC duct supports
not the same as the elevations shown on the isometric drawing.
                        have been reinspected by ERC with 18 deviations identified, mostly in
Dispositions of the above findings are open items (445/8514-0-27
                        the areas of weld size and configurations. The deviations are
and 446/8511-0-06).
                        currently being evaluated for validity and safety significance by
No NRC violations or deviations were' identified.
                        ERC.
i
                        Status of NRC Inspection Activity                                       '
;
                        (1) As of October 30, 1985, the following three reinspections of
o.
                              sampled HVAC duct supports were witnessed by the NRC:                         '
HVAC Duct Supports
Status of CPRT Activity
Visual einspection of a random sample of 66 HVAC duct supports from
Units 1, 2, and common is in process.
Twenty-five HVAC duct supports
have been reinspected by ERC with 18 deviations identified, mostly in
the areas of weld size and configurations.
The deviations are
currently being evaluated for validity and safety significance by
ERC.
Status of NRC Inspection Activity
'
(1) As of October 30, 1985, the following three reinspections of
sampled HVAC duct supports were witnessed by the NRC:
'
f
f
Verification Package No.
Unit No.
Duct Support No.
'
t
t
                              Verification Package No.    Unit No.    Duct Support No.
p.
                                                                                                        '
, I-S-HVDS-023
p.                        , I-S-HVDS-023                     1         CB-830-1N-1R
1
                              I-S-HVDS-041                   1         AB-842-1L-1F
CB-830-1N-1R
                              I-S-HVDS-005                   2         CB-790-2N-1BF
I-S-HVDS-041
1
AB-842-1L-1F
I-S-HVDS-005
2
CB-790-2N-1BF
>
>
                        (2) During the above reinspections, ERC identified the following
(2) During the above reinspections, ERC identified the following
          .
conditions to the NRC inspector as subject to evaluation as
                              conditions to the NRC inspector as subject to evaluation as
.
'
'
                              potential deviations:
potential deviations:
                              I-S-HVDS-023:   Size of horizontal brace was not per the drawing
I-S-HVDS-023:
                              and several welds were undersize.
Size of horizontal brace was not per the drawing
        ,
and several welds were undersize.
                              I-S-HV05-041: Undersize fillet welds.
,
I-S-HV05-041:
Undersize fillet welds.


        _
                                            ,                              -        _    __
7
7
    ' o                                                       s                 *
_
                                              -38-
,
                      I-S-HVDS-005:   Wrong weld location, undersize fillet welds, and
-
                      craters.
_
                      Dispositions of the above findings are open items
__
                      (445/8514-0-28,445/8514-0-29,446/8511-0-07).
' o
                      No NEC violations or deviations were identified.
s
          p.   Containment Liner and Tank Stainless Steel Liner
*
                Status of CPRT Activity
-38-
                Ninety-one verification packages have been issued and reinspections
I-S-HVDS-005:
                are approximately 96% complete using QI-031, Revision 0.
Wrong weld location, undersize fillet welds, and
                Documentation review of these packages using QI-032, Revision 0, is
craters.
                approximately 45% complete. Eighty-three DRs relating to the
Dispositions of the above findings are open items
                documentation review have been issued. These deviations are
(445/8514-0-28,445/8514-0-29,446/8511-0-07).
              : currently being reviewed for validity and safety significance by ERC.
No NEC violations or deviations were identified.
                Status of NRC Inspection Activity
p.
                Review of NRC Inspection Report 50-445/85/13, 50-446/85-09 showed
Containment Liner and Tank Stainless Steel Liner
                that the number of inspections witnessed was incorrectly reported as
Status of CPRT Activity
                four rather that the actual number of nine. No additional NRC
Ninety-one verification packages have been issued and reinspections
                inspection activity occurred during this report period.
are approximately 96% complete using QI-031, Revision 0.
          q.   Structural Steel
Documentation review of these packages using QI-032, Revision 0, is
                Status of CPRT Activity
approximately 45% complete.
                A random sample of 60 structural steel members was selected from a
Eighty-three DRs relating to the
                total population of approximately 1600 individual members.
documentation review have been issued.
                Verification' packages are currently being prepared by ERC for each
These deviations are
: currently being reviewed for validity and safety significance by ERC.
Status of NRC Inspection Activity
Review of NRC Inspection Report 50-445/85/13, 50-446/85-09 showed
that the number of inspections witnessed was incorrectly reported as
four rather that the actual number of nine.
No additional NRC
inspection activity occurred during this report period.
q.
Structural Steel
Status of CPRT Activity
A random sample of 60 structural steel members was selected from a
total population of approximately 1600 individual members.
Verification' packages are currently being prepared by ERC for each
member in the sample.
QI-045, Revision 1, is being used for physical
'
'
                member in the sample. QI-045, Revision 1, is being used for physical
reinspection.
                reinspection. Fifteen packages have been issued to ERC inspectors
Fifteen packages have been issued to ERC inspectors
                and inspection is approximately 5% complete based on a minimum sample
and inspection is approximately 5% complete based on a minimum sample
                of 60.   Several of the 15 issued packages require additional drawings
of 60.
                and clarification.     Ten deviations have been identified, involving
Several of the 15 issued packages require additional drawings
                primarily incorrect member size, undersized and missing welds,
and clarification.
                inadequate bolt hole coverage, and inadequate Hilti bolt edge
Ten deviations have been identified, involving
                distance. A second random sample of structural steel members related
primarily incorrect member size, undersized and missing welds,
                to safe shutdown systems is scheduled to be selected and inspection
inadequate bolt hole coverage, and inadequate Hilti bolt edge
                commenced by the end of November 1985.
distance.
A second random sample of structural steel members related
to safe shutdown systems is scheduled to be selected and inspection
commenced by the end of November 1985.
,
,
            '
Status of NRC Inspection Activity
                Status of NRC Inspection Activity
'
                (1) The NRC inspector has reviewed QI-045, Revision 1. The
(1) The NRC inspector has reviewed QI-045, Revision 1.
                      following three inspections have been witnessed representing 5%
The
                      of the first random sample:
following three inspections have been witnessed representing 5%
  .
of the first random sample:
k                                                                                       --
.
k
.
.
.
.
.
.
.
.
.
.
--


  *
*
.
.
                                    -39-
-39-
                                                            .
.
            Verification Package No.       Equipment No.       Unit No.
Verification Package No.
            I-S-STEL-120                   MRB-0565-DCA-MK-A       1
Equipment No.
            I-S-STEL-88                     AFC0-MK-C182-7-RB       1           ,
Unit No.
            I-S-STEL-95                     AFC0-MK-D180-1-RB       1
I-S-STEL-120
      (2) During the above reinspections, ERC identified the following
MRB-0565-DCA-MK-A
            conditions to the NRC inspector as subject to evaluation as
1
            potential deviations:
I-S-STEL-88
            I-S-STEL-120:   Three attributes were rejected; i.e.,
AFC0-MK-C182-7-RB
            (a) connection location, (b) connection size, and (c) bolt hole
1
            edge distance.
,
            I-S-STEL-88:   Undersized welds and incorrect member size were
I-S-STEL-95
            identified.
AFC0-MK-D180-1-RB
            I-S-STEL-95: Exposed bolt holes and inadequate bolt tightening
1
            were identified.
(2) During the above reinspections, ERC identified the following
            Dispositions of the above findings are open items (445/8514-0-30
conditions to the NRC inspector as subject to evaluation as
            through 445/8514-0-32).
potential deviations:
            No NRC violations or deviations were identified,
I-S-STEL-120:
    r. Concrete Placement
Three attributes were rejected; i.e.,
      Status of CPRT Activity
(a) connection location, (b) connection size, and (c) bolt hole
      Reinspection of the first random sample of 60 concrete placement
edge distance.
      packages is approximately 92% complete.     Twenty eight deviations have
I-S-STEL-88:
      been identified relating primarily to unfilled holes, voids, and
Undersized welds and incorrect member size were
      debris in the concrete surface. These deviations are currently being
identified.
      reviewed for validity and safety significance by ERC. Documentation
I-S-STEL-95:
      review procedures have not yet been issued.
Exposed bolt holes and inadequate bolt tightening
      Status of NRC Inspection Activity
were identified.
      (1) The NRC inspectot has reviewed QI-043, Revision 0, and witnessed
Dispositions of the above findings are open items (445/8514-0-30
            9 reinspections representing 15% of the first random sample of
through 445/8514-0-32).
            60 concrete placements.     The following three ERC reinspections
No NRC violations or deviations were identified,
            were witnessed by the NRC inspector during this report period:
r.
Concrete Placement
Status of CPRT Activity
Reinspection of the first random sample of 60 concrete placement
packages is approximately 92% complete.
Twenty eight deviations have
been identified relating primarily to unfilled holes, voids, and
debris in the concrete surface.
These deviations are currently being
reviewed for validity and safety significance by ERC. Documentation
review procedures have not yet been issued.
Status of NRC Inspection Activity
(1) The NRC inspectot has reviewed QI-043, Revision 0, and witnessed
9 reinspections representing 15% of the first random sample of
60 concrete placements.
The following three ERC reinspections
were witnessed by the NRC inspector during this report period:
-
- -
- - -
-
-
-
-


r. .
r.
                                    -40-
.
            Verification Package No. Concrete Placement No.       Unit No.
-40-
              I-S-CONC-40               CPC-105-6831-014             1
Verification Package No. Concrete Placement No.
              I-S-CONC-51               CPC-105-5865-012             1
Unit No.
              I-S-CONC-11               CPS-101-2808-001             1
I-S-CONC-40
        (2) During the above reinspections, ERC identified the following
CPC-105-6831-014
            conditions as potential deviations to the NRC inspector and
1
              subsequently issued DRs:
I-S-CONC-51
              I-S-CONC-40:   The locations of concrete cast-in place inserts
CPC-105-5865-012
              (Richmond) were out of tolerance.   DR I-S-CONC-40-DR1 was issued
1
              subsequent to the inspection.
I-S-CONC-11
              I-S-CONC-51:   Voids were identified in the concrete surface.
CPS-101-2808-001
            DR I-S-CORC-51-DR1 was issued subsequent to the inspection.
1
            Dispositions of the above findings are open items (445/8514-0-33
(2) During the above reinspections, ERC identified the following
            and 445/8514-0-34).
conditions as potential deviations to the NRC inspector and
            No NRC violations or deviations were identified.
subsequently issued DRs:
    s. Small Bore Pipe Supports
I-S-CONC-40:
        Status of CPRT Activity
The locations of concrete cast-in place inserts
        A population of 7947 small bore pipe supports has been identified
(Richmond) were out of tolerance.
        from which a total of 76 support verification packages were randomly
DR I-S-CONC-40-DR1 was issued
        selected for reinspection. The first 60 of the verification packages
subsequent to the inspection.
        make up the first random sample as defined by the CPRT Action Plan.
I-S-CONC-51:
        The second sample pertains to safe shutdown systems and consists of
Voids were identified in the concrete surface.
        44 from the first sample of 60 and an additional 16 packages. The
DR I-S-CORC-51-DR1 was issued subsequent to the inspection.
        QIs used for reinspection and documentation review were QI-019,
Dispositions of the above findings are open items (445/8514-0-33
        Revision 2, and QI-020, Revision 0, respectively.
and 445/8514-0-34).
        Physical reinspections are approximately 95% complete.   A total of 65
No NRC violations or deviations were identified.
        deviations have been identified, relating primarily to Hilti bolt
s.
        embedment, hole spacing and edge distance in base plates, and pipe
Small Bore Pipe Supports
        clearances. Documentation review is approximately 82% complete with
Status of CPRT Activity
        51 deviations identified. All deviations are currently being
A population of 7947 small bore pipe supports has been identified
        reviewed for validity and safety significance by ERC.
from which a total of 76 support verification packages were randomly
        Status of NRC Inspection Activity
selected for reinspection.
        The NRC inspector has reviewed QI-019, Revision 2, and QI-020,
The first 60 of the verification packages
        Revision 0. Six physical reinspections representing 10% of the first
make up the first random sample as defined by the CPRT Action Plan.
                                                                                ,
The second sample pertains to safe shutdown systems and consists of
44 from the first sample of 60 and an additional 16 packages.
The
QIs used for reinspection and documentation review were QI-019,
Revision 2, and QI-020, Revision 0, respectively.
Physical reinspections are approximately 95% complete.
A total of 65
deviations have been identified, relating primarily to Hilti bolt
embedment, hole spacing and edge distance in base plates, and pipe
clearances. Documentation review is approximately 82% complete with
51 deviations identified.
All deviations are currently being
reviewed for validity and safety significance by ERC.
Status of NRC Inspection Activity
The NRC inspector has reviewed QI-019, Revision 2, and QI-020,
Revision 0.
Six physical reinspections representing 10% of the first
-
- -
- -
,


    '
  .
'
'
                                    -41-
.
        random sample were witnessed by the NRC inspector during September 1985.
        No reinspections were witnessed during this report period.
        No NRC violations or deviations were identified.
'
'
      t. Reinspection of Pipe Whip Restraints
-41-
        Status of CPRT Activity
random sample were witnessed by the NRC inspector during September 1985.
No reinspections were witnessed during this report period.
No NRC violations or deviations were identified.
'
t.
Reinspection of Pipe Whip Restraints
Status of CPRT Activity
,
,
        ERC has completed 13 out of the planned 110 reinspections of pipe
ERC has completed 13 out of the planned 110 reinspections of pipe
        whip restraints as of October 26, 1985.
whip restraints as of October 26, 1985.
        Status of NRC Inspection Activity
Status of NRC Inspection Activity
        (1) The following two ERC reinspections of pipe whip restraints were
(1) The following two ERC reinspections of pipe whip restraints were
              witnessed by the NRC inspector:
witnessed by the NRC inspector:
              Verification Package No. Support Identification       Unit
Verification Package No. Support Identification
              I-S-PWRE-052               CP2-CSSSMR-05               2
Unit
              I-S-PWRE-518             M40-52-0584                 2
I-S-PWRE-052
        (2) During the above reinspections, ERC identified the following
CP2-CSSSMR-05
2
I-S-PWRE-518
M40-52-0584
2
(2) During the above reinspections, ERC identified the following
conditions to the NRC inspector as subject to evaluation as
i
i
              conditions to the NRC inspector as subject to evaluation as
potential deviations:
              potential deviations:
I-S-PWRE-052:
              I-S-PWRE-052: (a) The distance between two capture plates on a
(a) The distance between two capture plates on a
moment restraint was 9 5/16 inches, which was less than the
,
,
              moment restraint was 9 5/16 inches, which was less than the
!            allowed distance of 9 1/2 +/- 1/8 inch; and (b) distance from
!
!
              the centerline of one capture plate to the centerline of a weld
allowed distance of 9 1/2 +/- 1/8 inch; and (b) distance from
              was 3 3/8 inches, which was greater than the allowed distance of
!
              3 1/8 +/- 1/8 inch.
the centerline of one capture plate to the centerline of a weld
was 3 3/8 inches, which was greater than the allowed distance of
3 1/8 +/- 1/8 inch.
1
1
i             I-S-PWRE-518: The grout did not completely cover the shim plate
i
l             underneath the top baseplate.
I-S-PWRE-518:
The grout did not completely cover the shim plate
l
underneath the top baseplate.
,
,
I             Dispositions of the above findings are open items (446/8511-0-08
I
              and 446/8511-0-09).
Dispositions of the above findings are open items (446/8511-0-08
        (3) ERC also noted the following deficiencies outside of the defined
and 446/8511-0-09).
              inspection scope:
(3) ERC also noted the following deficiencies outside of the defined
              I-$-PWRE-052: One of the Richmond inserts on concrete column
inspection scope:
I             No. 15 overlapped a Hilti bolt embedment for a pipe support on
I-$-PWRE-052:
!             the adjacent face of the same column by approximately
One of the Richmond inserts on concrete column
l             2 3/4 inches. The Hilti bolt centerline was about 5 inches
I
No. 15 overlapped a Hilti bolt embedment for a pipe support on
!
the adjacent face of the same column by approximately
l
2 3/4 inches.
The Hilti bolt centerline was about 5 inches
i
i
l                                                                                 i
l
                                                                                  '
i
'
I
I
.
. .
-
- -
-
.


~
~
  , o
o
,
i
i
                                      -42-
-42-
                above the Richmond insert centerline.   The impact of this
above the Richmond insert centerline.
      *
The impact of this
                condition was to be evaluated.
condition was to be evaluated.
                I-S-PWRE-518:   There was a crater chipped out of the grout.
*
I-S-PWRE-518:
There was a crater chipped out of the grout.
I
I
                Dispositions of the above findings are open items (446/8511-0-10
Dispositions of the above findings are open items (446/8511-0-10
                and 44G/8511-0-11).
and 44G/8511-0-11).
          No NRC violations or deviations were identified.
No NRC violations or deviations were identified.
!
!
      u. Reinspection of Instrument Pipe / Tube Supports
u.
          Status of CPRT Activity
Reinspection of Instrument Pipe / Tube Supports
Status of CPRT Activity
i
i
          ERC has completed 42 out of the planned 102 rainspections of
ERC has completed 42 out of the planned 102 rainspections of
          instrument pipe / tube supports as of October 26, 1985.
instrument pipe / tube supports as of October 26, 1985.
          Status of NRC Inspection Activity
Status of NRC Inspection Activity
          (1) The following four ERC reinspections of instrument pipe / tube
(1) The following four ERC reinspections of instrument pipe / tube
(               supports were witnessed by the NRC inspector during this report
(
                period:
supports were witnessed by the NRC inspector during this report
l
l
                Verification Package No. Instrument Tag No.       Unit No.
period:
                I-S-INSP-004             1-FT-156                     1
Verification Package No. Instrument Tag No.
                I-S-INSP-017             1-FI-245-78                 1
Unit No.
                I-S-INSP-024             1-P15-3384                   1
I-S-INSP-004
                I-5-INSP-057             1-LT-459                     1
1-FT-156
          (2) During the above reinspections, ERC identified the following
1
                conditions to the NRC inspector as subject to evaluation as
I-S-INSP-017
                potential deviations:
1-FI-245-78
1
I-S-INSP-024
1-P15-3384
1
I-5-INSP-057
1-LT-459
1
(2) During the above reinspections, ERC identified the following
conditions to the NRC inspector as subject to evaluation as
potential deviations:
:
:
l               I-S-INSP-004: (a) Support Nos. 48, 4C, 40, 4E, and 4K had bolts
l
                without the minimum 70% of specified torque; and (b) support
I-S-INSP-004: (a) Support Nos. 48, 4C, 40, 4E, and 4K had bolts
                No. 41 did not have the serrated groove of the spring nut
without the minimum 70% of specified torque; and (b) support
                aligned with the channel ridge.
No. 41 did not have the serrated groove of the spring nut
                I-S-INSP-017: (a) Support No. 170 had a bolt without the
aligned with the channel ridge.
                required one thread past the face of the nut; (b) support Nos. 171,
I-S-INSP-017: (a) Support No. 170 had a bolt without the
                17K, 17L, 17M, 17N, and 17Q had bolts without the minimum 70% of
required one thread past the face of the nut; (b) support Nos. 171,
                specified torque; (c) support No. 17K did not have the serrated
17K, 17L, 17M, 17N, and 17Q had bolts without the minimum 70% of
                groove of the spring nut aligned with the channel ridge; and
specified torque; (c) support No. 17K did not have the serrated
1                                                                                  1
groove of the spring nut aligned with the channel ridge; and
                                                                                    1
1
,
,
                                                                                    l
l
l
l
l
l


  ,
*
    *
,
                                            -43-
-43-
                    (d) support Nos. 17A, 17J, and 17K had different type instrument
(d) support Nos. 17A, 17J, and 17K had different type instrument
                    tubing clamps than specified on the drawing.                     l
tubing clamps than specified on the drawing.
                    I-S-INSP-024: (a) Supp3rt No. 24H had an undersized weld; (b)
l
                    support No. 24H had no visible heat numbers on the baseplate;
I-S-INSP-024:
                    (c) support No. 24H had a structural tubing length of
(a) Supp3rt No. 24H had an undersized weld; (b)
                    56 3/4 inches, which is 1/2 inch greater than the maximum
support No. 24H had no visible heat numbers on the baseplate;
                    allowable length specified on the drawing; and (d) support No.
(c) support No. 24H had a structural tubing length of
l                   24H had a different type of instrument tubing clamp than
56 3/4 inches, which is 1/2 inch greater than the maximum
l                   specified on the drawing,
allowable length specified on the drawing; and (d) support No.
i                   I-S-INSP-057: (a) Support Nos. 57A and 57E did not have the
l
                    serrated grooves of the spring nut aligned with the channel
24H had a different type of instrument tubing clamp than
l                   ridge; (b) support Nos. 57N and 57P had spring nuts used in lieu
l
l                   of required hex nuts; and (c) support No. 57N had a bolt that
specified on the drawing,
!                   did not have minimum 70% of specified torque.
i
I-S-INSP-057: (a) Support Nos. 57A and 57E did not have the
serrated grooves of the spring nut aligned with the channel
l
ridge; (b) support Nos. 57N and 57P had spring nuts used in lieu
l
of required hex nuts; and (c) support No. 57N had a bolt that
!
did not have minimum 70% of specified torque.
l
l
l
l
                    Dispositions of the above findings are open items
Dispositions of the above findings are open items
                    (445/8514-0-35 through 445/8514-0-38).
(445/8514-0-35 through 445/8514-0-38).
,
,
              (3) The following two ERC reinspections were independently inspected
(3) The following two ERC reinspections were independently inspected
                    by the NRC inspector:
by the NRC inspector:
l                   Verification Package No.     Instrument Tag No.     Unit No.
l
                    I-S-INSP-007                 1-PT-405                   1
Verification Package No.
                    I-S-INSP-028                 1-PI-2467                 1
Instrument Tag No.
l                   While performing the above independent inspections, it was noted
Unit No.
I-S-INSP-007
1-PT-405
1
I-S-INSP-028
1-PI-2467
1
l
While performing the above independent inspections, it was noted
that on support Nos. 0070 and 028A, the serrated grooves on the
t
t
                    that on support Nos. 0070 and 028A, the serrated grooves on the
I
I                  spring nuts did not align with the channel clamping ridge. This
spring nuts did not align with the channel clamping ridge.
i                   is required by attribute 4.5 of QI-055, " Reinspection of
This
i
is required by attribute 4.5 of QI-055, " Reinspection of
l
l
                    Instrument Pipe / Tube Supports." However, the ERC inspectors
Instrument Pipe / Tube Supports." However, the ERC inspectors
!                   signed off this attribute as being acceptable.   This is an NRC
!
                    deviation (445/8514-D-04).
signed off this attribute as being acceptable.
      8. Unresolved Items
This is an NRC
        Unresolved items are matters for which more information is required in
deviation (445/8514-D-04).
        order to ascertain whether they are acceptable items, violations, or
8.
        deviations. Seven unresolved items disclosed during the inspection are
Unresolved Items
j       discussed in paragraphs 6.g 6.h, 6.j, 7.a. 7.c, and 7 e.
Unresolved items are matters for which more information is required in
      9. Exit Interview
order to ascertain whether they are acceptable items, violations, or
        An exit interview was conducted on November 1, 1985, with the applicant
deviations.
        representativos denoted in paragraph 1 of this appendix. During this         ,
Seven unresolved items disclosed during the inspection are
        interview, the NRC inspectors summarized the scope and findings of the       '
j
        inspection. The appilcant acknowledged the findings,
discussed in paragraphs 6.g
6.h, 6.j, 7.a. 7.c, and 7 e.
9.
Exit Interview
An exit interview was conducted on November 1, 1985, with the applicant
representativos denoted in paragraph 1 of this appendix. During this
,
interview, the NRC inspectors summarized the scope and findings of the
'
inspection.
The appilcant acknowledged the findings,
i
i
l
l
- .-
.
-
-
-
-
.
-
-
-
-
-
-
-
.
.
-
-
-
- -
-
.
-
- - -
}}
}}

Latest revision as of 19:39, 24 May 2025

Response Team Activities Insp Repts 50-445/85-14 & 50-446/85-11 on 851001-31.Violations Noted: Drawings Revised W/O Required Review & Approval Actions & Insp Repts Signed by Noncertified Electrical Inspector
ML20141P077
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/03/1986
From: Barnes I, Ellershaw L, Hale C, Jhnson A, Andrea Johnson, Westerman T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20141P047 List:
References
50-445-85-14-02, 50-445-85-14-2, 50-446-85-11, NUDOCS 8603180523
Download: ML20141P077 (43)


See also: IR 05000445/1985014

Text

m,

.

_ - -

-

-

o

;;

y.

-

,

fs

"

'

,

'

a

w.

.

.

.

,

,

". .-

d-

[ '( -

APPENDIX E

.

'

'

U. S. NUCLEAR REGULATORY COMMISSION

c-

-

!J f *

'

,r

REGION IV

.

I

'

m.,

COMANCHE PEAK RESPONSE TEAM AC1IVITIES INSPECTION REPORT

,

,

l

,

I .

,

'

NRC Inspection' Report? 50-445/85-14

Permit: CPPR-126

,

,'

50-446/85-11

CPPR-127

<

s

'

, Docket's:

50-445

Category:

A2

l

_ ,'

,

50-446'

'

,

..

>

.

,

!~

Applicant: -Texas Utilities Electric Company

'

.

v

l

. Skyway Tower

.

400 North Olive ~ Street

'

Lock Box 81

-

['

Dallas, Texas

75201

,

I

Facility Name:

Comanche Peak Steam' Electric Station (CPSES), Units 1 and 2

l

l

Inspection At: Glen Rose, Texas

l

l

Inspection Condu t d: October 1-31, 1985

Inspectors:

b

[

fN

c

L. E. Ellershaw, Reactor Inspector, Region IV

'DaYe

CPSES Group

(paragraphs 1, 2.a, 3, 6.b, 6.e-6.g, 6.j, 7.e-7.u)

1

G

SM

-

I

C.J. @p, Reactor Inspector, Region IV CPSES

D(ite ' ' ~ ~

'

Grou

(paragraphs 1, 2.b, 4, 5, 6.c-6.d, 6.h-6.1)

.

f&

&.

$/7/8G,

p-

'

.A. R. Johnson, Reactor Inspector, Region IV

Date

CPSES Group

3

(paragraphs 1, 6.a, 7.s-7.e)

I

'

'

Consultants:

EG&G - R. Bonnenberg, J. Dale, L. Jones, A. Maughan, W. Richins,

.

R.-VanderBeek

'

i

I

wi

.

,

.

an

- ' * * .

A

i

-

.

. .

.

.

.

.

.

.

.

.

.

_________________._____.;

.- .

.

-

..

.

_

..

.

. . _

_ . _ -

a,

-2-

Parameter - J. Birmingham, D. Brown, J. Gibson, K. Graham,

D. Jew,

Reviewed By:

8w

r/7/#6

-

.

I. Barnes, Group Leader, Region IV CPSES Group

Date

Approved:

l' f h F

3h/%

T. F. Westerman, Chief, Region IV CPSES Group

Date /

Inspection Summary

'

.

Inspection Conducted: October 1-31, 1985 (Report 50-445/85-14; 50-446/85-11)

l

'

>

,

Areas Inspected: Nonroutine, unannounced inspection of applicant actions on

.

!

previous inspection findings, followup on alleged contractor improprieties,

Comanche Peak Response Team (CPRT) procedures and instructions, and CPRT issue

1

- specific action plans (ISAPs). The inspection involved 2363 inspector hours

onsite by 5 NRC inspectors and 11 consultants.

A summary of NRR and IE audit

activities is provided in paragraph 4.

'

Results: Within the four areas inspected, two violations (revision of drawings

without required review and approval actions, paragraph 2.a; signing of

inspection reports by a noncertified electrical inspector, paragraph 8.c) and

f

four deviation (ERC equipment / service requests not controlled as committed,

paragraph 6.a; inadequate ERC document review and procedure criteria with

respect to nonrecreatable and inaccessible inspection attributes, paragraphs

.

8.c and 8.e; failure of ERC document reviewers to detect a lapsed electrical

inspector certification and to record required information in a verification

package, paragraph 8.c; and in>pection attributes being attested to as

i

acceptable by ERC inspectors which were found by subsequent NRC inspection to

be unacceptable, paragraphs 8.e, 8.1, and 8.u) were identified.

,

l

.

.

.

m

.

.

.

.

.

.

.

.

.

.

. .

.

.

{.,fff

.,,

,

i

~

.I

.

w -

,

-

,

. _

,

t ,

?

b

4

)_

.:

r

,

[.

i

's

!

.,

f

_

-3-

'

,

,

.

..

.

<

,

,

'

'

'

L

t

DETAILS

.

g,,

.

,

,

>g

1. ,* Persons Contacted

,

-

,

,},

.

~ ~D.: L Andrews, TUSI Director of Corporate Security

m,

J. Arros, TERA Civil / Structural Issue Coordinator '

-

-

'

C. I..Browne, Project Manager, R.

L.' Cloud & Associates,.Inc.

^R. E. Camp,' Assistant Project General Manager, Unit 1 (Impe11

.

,

scorp.)

-

J..Finneran, TUGC0 Lead Pipe Support Engineer

,

,

  • S. M. Franks, Special Projects and Technical Support Lead (Impe11

,

. Corp.)

,

.

_

.

  • J. B. George, TUGC0 Vice President, Plant General Manager

'

  • P. E. Halstead, TUGC0 Site QC Manager

.

,

J. L. Hansel, ERC QA/QC Review Team Leader _

C. K. Moehlm6n, TUGC0 Project Mechanical Engineer

  • C. Killough,' TUGC0 Supervisor, Operations Quality

.

M. Obert,.ERC TRT Issue Coordinator

A. Patterson, ERC Engineering Supervisor

C. Spinks, ERC Inspection Supervisor

  • i. G. Tyler, TUGC0 CPRT Program Director

'

  • C. H. Welch, TUGC0 QC Services-Supervisor

.

R. Werner, Manager,. Safeteam

'

  • P. B. Stevens, TUGC0 Project Electrical Engineer

G. Benfer, Bahnson Services Co. Site QA Manager

D. W. Snow, Brown & Root (B&R) QA/QC Coordinator

,

'

T. Wright, TUGC0 civil Engineer

.

  • G. W. Ross, ERC Onsite QA Representative

J. Adam, ERC Supervisor, Safety. Significance Evaluation Group

D. M.. Kim, Principal Mechanical Engineer, Gibbs & Hill (G&H)

l

T. Brandt, TUGC0 Quality Engineering Supervisor

J. R Honekamp, TRT Issues Manager, TERA

,

P. Turi, TERA Issue Coordinator

i

G. Purdy, B&R QA Manager

'

J. E. Young, ERC Issue Coordinator

J. R. Gelzer, ERC Issue Coordinator

S. L. Crawford, ERC Issue Coordinator -

,

P. Thomas,.ERC Supervisor, Inspection Group Services

'

D. Alexander, ERC Supervisor, Herdware Issues

J.

P. Amoroso, ERC Supervisor, Eardware Collective Evaluation

R. Melton, TERA Documentation Coordinator

J. Ma11anda, CPRT Electrical Review Team Leader

.

  • Denntes those persons who attended the exit interview.

The NRC inspectors also contacted other CPRT and appitcant employees

l

<

during this inspection period.

.

i

.

I

4

l

'

'

}

.

d

a

.

' ' " '

- '

.

3'

. .

.

.

.

.

.

-

-

.

,A
,.

.

s

f,

-4-

2.

Applicant Actions on Frevious Inspection Findings

a.

(0 pen) Open Item (445/3511-0-04): This item remains open pending the

review and assessmant of the dispositions relating to the 12

deviatir.g skewed welus in NF supports.

,

Further review with respect to the status of this item has resulted

in the NRC's identification of a violation.

During ERC's reinspection of skewed welds in Unit 1, unde size

.

conditions were identified and documented on B&R nonconformance

reports (NCRs) as early as June 1985.

CPSES Station Administration

Manual Procedure No. STA-405 requires that all documented

nonconformances, in which "use-as-is" dispositions are recommended,

be forwarded to TUGC0 Operations Results Engineering Group for review

to determine if as-built documentation changes are needed.

Further,

CPSES Nuclear Operations Engineering Manual Instruction No. N0E-201-5

requires that proposed drawing changes be submitted to Operations for

review, approval, and authorization to distribute the revised

drewing.

The NCRc associated with the undersize skewed welds are identified as

XI-2,

-3,

-4, -5,

-6, -7,

-8, -10 and -11.

The applicable pipe

support drawings were resised by TUGC0 Nuclear Engineering (TNE) to

reflect the undersize weld conditions.

Recalculations were performed

to support the use of the welds without rework or repairs. While the

NCRs were not formally dispositioned, this action, in effect,

provided a "use-as-is" disposition.

However, TUGC0 Operations did

not review and approve the drawing revisions.

In fact, in most cases

TUGC0 Operations did not initiate their own NCR to address these

conditions until after INE had' revised and distributed the drawings.

As of the end of this report period, TUGC0 Operations NCRs have not

been dispositioned.

The NRC inspector was informed by TUGC0

.

Operations personnel that their review has found a number of

'

mathematical errors in the TNE recalculations, thus precluding a

dispositioning of the TUGC0 NCRs.

!

The failure of TNE to acquire TUGC0 Operations review and approval

prior to initiating drawing revisions is a violation

(445/8514-V-03).

,

b.

(Closed) Open Item (445/8513-0-06):

Pecvisions for familiarizing QC

inspectors with changes in QC inspection procedures.

Details on this

subject are contained in paragraph 7.d of this appendix.

3.

Followup On Alleged Contractor Improprieties

The NRC inspector performed a followup inspection with respect to the

identification by a local newspaper of alleged contractor improprieties.

The inspection was_ performed to ascertain whether the alleged

-

--

-

.

_

_

. .

,

,

t?li '

,

-

,

.

,

.c

~

n,

,

i

~

5

-

,

,

'

'

improprictles, if substantiated, could adversely affect safety-related

components and systems.

NRC review of this subject revealed that the

i

,

alleged improprieties, which consisted of eight specific items, had been

.

reviewed by the TUGC0 Safeteam and by the TUSI Director of Coroorate

Security. NRC examination of the items, certain of which were

substantiated, resulted in a determination that there was no instance

whers any substantiated item had any impact with respect to safety-related

components or systems.

The NRC considers this item to be closed.

,

. 4.

NRR and IE Audit / Inspection Activities

4.

NRR;

A site inspection was performed during October 10-11, 1985,

pertaining to civil / structural issues. Audits were performed on

October 25, 1985, at Ebasco and Stcne and Webster, New York,

pertaining, respectively, to cable tray / conduit supports and small

bore piping review.

A site audit was performed of homogeneity of

construction processes during October 9-10, 16-18, and 28-31, 1985.

b.

IE:

An inspection of Design Adequacy Review was initiated at TERA.

Bethesda, Maryland, during October 28 through Nover.ber 4,1985.

A

site inspection of QA program procedures was performed on

October 20-24, 1985.

,

Copies of reports for these activities will be placed in the Public

Document Room upon completion.

5.

CPRT Procedures and Instructions

a.

Implementaticn of ERC Procedures and Instructions

(1) Audit of_CPP-012 (QA/QC Interface with Constructor /TUGCO)

The TUGC0 interface consists of three systems used to request

equipment or services, copies of documents, or technical

information.

Each is handled by a differer,t process, as defined

in CPP-012.

'

(a) Written requests for equipment and services are used by the

QA/QC inspectors to recuest from TUGC0 or B&R any equipment

,

or services needed to perform an inspection.

These

requests are included in the completed inspection package.

-

-

An NRC inspection of CPP-012 implementation showed that the

requests for equipment and services were being processed in

.

F

f

4

b

s

i

L

<

.

-6-

accordance with CPP-012 requirements, with the exception

that the QA/QC Records Administrator was not controlling

these requests as required by Section 4.4.6 of the

procedure.

No logs or files were maintained by +.he QA/QC

Records Administrator.

This item is an NRC deviation

(445/8514-D-01). During this inspection, the NRC inspector

concluded from information provided by ERC personnel that a

log of requests was not being naintained by the QA/QC

Inspection Supervisor, as required by Section 5.1.3 of

CPP-012.

Subsequent to this report period, the NRC was

inforn:ed by ERC management that this understanding was

incorrect and that the required log was, in fact, being

maintained in accordance with CPP-012 requirements.

Followup inspection confirmed that the ERC clanagenent

information was correct.

It was ascertained, however,

during this followup inspection that verification package

numbers were being used to identify requests in the log.

This practice permits more than one request to have the

same identification number and is ccntrary to procedural

requirements for use of unique identification numbers.

TUGC0 has been requested by the transmittal letter for this

inspection report to include this subject in their response

to deviation 445/8514-D-01.

l

(b) Document requests are used to request copies of TUGC0 or

Cid documents required by the ERC inspectors.

Section 5.2.2

of CPP-012 requires that the QA/QC issue coordinators

maintain a file of these requests.

The files of two issue

coordinators were inspected by the NRC, and found to be

satisfactory.

No NRC deviations were identified.

(c) Technical information requests are prepared by a member of

the QA/QC Review Team when a request for clarification or

additional information is required.

These, after

supervisory approval, are sent to the responsible TUGC0

liaison engineer by the QA/QC Records Administrator, who

also log and files the requests.

The logged item is

closed and the request filed when the information arrives

from the TUGC0 liaison er.gineer.

Two specific requests

were traced t;y the HRC inspector through the Construction

Sampling Reinspection Engineering Group and Recoros

Administration, and found to have been satisfactorily

!

processed and routed.

No hRC deviations were identified.

7<

1

. ,

-

o

4

+o

}-

'

'

"

s

.

>

,

,

?

<

,

..

l'

_

i

<'

q1

,

.. y

.

!

'

'

(2) CPP-018(QA/QC Interface with the Design Adequacy ProgramJ

'

-

An NRC inspection confirmed that documents transmitted from ERC

,

to TERA for infermation only were transmitted by the QA/QC

.

Records' Administrator.

Documents requiring feedback from TERA

"

are logged and transmitted by the ERC Hardvare Isay s

Supervisor.

The TERA Design Adequacy Program Interface Coordinator receives

-

'

'

the ERC domments, distributes them and files one copy.

Items

'

'

requiring feedback to ERC are logged in and the date of reply is.

also logged. .The HRC inspector selected four documsats from the

~

.

ERC log and was able to satisfactorily trace them through the

~

ERC and TERA logging and filing systems.

No NRC deviat, ions ~were identifled.

- (3).CPP-010(PreparationofDeviationRNports)andCPP-016'(Safety

Significance Evaluations of Deviation Reports)

' Deviation Reports (DRs) are generated during thekardware and

'

documentation inspection process.

These DRs are' assessed <for

validity then forwarded for further processing to the Safety-

'

Significance Evaluation Group (SSEG) and'TUGCO.

.

1he NRC inspector confirmed that the process,(which is described

'

'in CPP.010 and CPP-016, is being'followed.

A sample of twenty

,

'

,0Rs was' selected from the SSEG tracking systenc ~ Each OR was

4

,

' verified to be correctly processed and documented by checking

'

,

each'for: (a) signatures of' originator, first reviewer, and

.

second reviewer; (b) transmission of the DR to MUGC0 and SSEG,

(c) transmission cf the DR to the proper distribution;

(d) filing of the DR in the verification package; and'

'

.

,

'

, (e) onfirmation from TUGC0 or B&R that they had assigned an NCR

- nut.oer to the DR. ; Revision 3 to CPP-010, which was released on

,:

.

,

'

'

October 11, 1985, incorporates provisions'.for revision,.

<'

.

,

cancellation, or; invalidation of a DR.

,

No NRC. deviations were identified.

i

<

,

,

s

.

,

(4) CPP-020 (Out-of-Scope Observations)

'

'

t

-

. Review team'personn'el are instructed in CPP-020(to report

'

apparent out-of-scope observation %by three part memorandum to

,

TUGCO.

In the NRC inspection cf this subject, it was' determined

,

that the ERC Supervisor, Hardware CollecWve Evaluation,

'

'

assigned a serial number on receipt-of the three part memorandum

and sent two of the copies to TUGCO. _The remaining copy is-

!

filed and logged, with identification made of the record

4

i

' y.

3

. 's*

s

,

'

-

-

-

- -

.

.

.

- - -

- .

- -.

.

.

,

-

-

. .

- -

..

-

'

(;

'

^

~

-8-

i

s

receiving date, date sent to TUGCO, and date of TUGC0 feedback.

'.

Six memoraida were reviewed by the NRC inspector to verify

implementat, ion of this process.

,

'

No NRC' deviations were identified.

!

'

,

(5) Inspection of ERC-QA-15 (Performance of Project Surveillance),

ER-QA-18 (Administration of Quality Assurance Auditina), and

'

-

ERC-QA-20 (Conduct of Programmatic Audits)

-The ERC Project Assurance Manager was contacted in an NRC

-

.

,

~

Jinspection of these procedures. The following documents were

'

. produced:

(a) surveillance plan for QA/QC Review Team ^ dated

,

Septeater 14,.1985; (b) surveillance status report dated

October 21, 1985; and (c) a' surveillance schedule.

'

-

ig

'

The Project Assurance Manager maintains an active file and

.1 status log of surveillance reports from the planning stage until

'

M tne recommendations are implemented.

The' surveillance reports

are distributed to the corporate' office, to the QA/QC Review-

Team Leader-(RTL), the Hardware Issues Supervisor, and the

,

j

organization being surveyed.

The reports are maintained as

open items until'all recommendations are implemented.

At that

time, the report files are closed and transmitted to the Records

-

i

Ada;inistrator.

Ttn NRC inspector reviewed four surveillance reports of which

three were closed (no deficient items) and one was still open

with one deficiency being processed.

Each report file contained

.

a three part memo to the QA/QC RTL, a surveillance checklist

,

report, and K surveillance checklist.

,

2

,-

~

No NRC deviations were identified.

,

The NRC reviewed the first quarterly corporate audit of the CPRT

'

activities.

The audit was performed September 23 through 26,

1985, and the report was issued October 15, 1985.

This

corpcrate audit identifisd one deficiency.

A response to the

audit was issued on October 21,.1985, providing

'

-

corrective / preventive actions. The second quarterly audit is

'

,c

-

being planned at this time, but a specific date has not been

r

set,

ly v

'

'

No NRC deviations were identified.

b.

TERA Procedures and Instructions

TERA has issued 16 of the 19 planned design adequacy procedures

,

~'

(0APs).

Review of these procedures indicates'that six apply, in

..

,\\

,

~

t:

.\\. :

'

.

,

'

,

b

a

g

W

- --

. .

if f.,

v.

. w a p y; j,- y9 .

.

.

,

.

'

' ' '

'

,

  1. y L;g * i lR , f ':.]

t,

'

'A'

'r -

,

.

,

73 , ;Q r j

w

~-'

' '

  • <

n'

'

, . -

.

,

'

x.

h k.K M*-LM-

1

.x

' t'

'!

,

c' >

-

,

. .

.,

,

',

'

,

r

-

+

L

p. c

_yo,

,.J'

[T+f:[-3;~ . Qg ,

yc

.-

~

, ,

'

"

(

,9- ;

'

,

,

.,

m.

, , ,

p

.; y

,

,

'"

}' '

4"

,,

j

,

[

jd

N

tw6cleorpart,toi.heilShPsdefininhTERAonsiteactivity

.I.

'; '

L

.

M' A ' s u

(civil-structural,' mechanical, and silscellaneous); :These ?.re DAP-2,

f, f

J" Documentation and Tracking of' Issues &nd Discrepancies"; DAP-14,

'

-

,

"DesignLAdequacy Program ~ Records"; DAP-15, " Training and

.

'

e

'

Qualification"; DAP-16,." Audits"; DAP-17, " Corrective Actions"; and

.

,

@ D.

'DAP-19, " Processing and Review.of Information'Between Quality of

'

-

".

%,,'

. Constructions.QA/QC Adequacy Program and Design; Adequacy Program."'

.-. ;,

_

,

.

4

- .

J

%yp

A,

DAP-14'and DAP-15 were. audited by the NRC inspector'and found to

N

m

comply with,the applicable CPRT Policies and Guidelines.

'

L

'

'

~

,

'

.

.

The NRC has inspected the implementation ,in this area and the results

+

d

of implementation:of UAP-2 is reported in NRC Inspection Report

'

.No. 50-445/85-13; 50-446/85-09.

i,.

.

&

,

,.

,

,

'

TDAP-16 and.DAP-17'are applicable to the onsite TERA effort; however,:

%

"

<

p

ithese~ procedures are implemented by offsite personnel' reporting to

' ' ' ,

.the Design Adequacy Program Quality' Assurance Manager. 'This offsite

.

TERA'activityJis being inspected. and reported by the NRC Office of

'

<

. Inspection'and Enforcement.

~

'

R

.

.

7,

wg

-

,

DAP-19 applies to the information: interfaces between the Design

'

'

  1. .

Adequacy Program and ERC Qual _ity of Construction and QA/QC Adequacy

-

.

i

',

Program groups. This DAP was audited by the NRC inspector in

H

. ,*

,',

il

conjunction with the implementation audit oftERC-Procedure CPP-018,

-

;

.

L

3.

. as; described in paragraph 5.a.(5)'above.

'

"

." 'No NRC' deviations were identified.

}

s

r

,

,

r

u

- ,

'c.

Implementation of CPRT Policies and Guidelines

1

L,.

'

..(1). Electrical Issues: .The electrical issues in the ISAPs are the

'

'

'jN

'O

.

"

,-

(.a

1,.,

0

responsibility of'one RTL.

The CPRT Policies and Guidelines

Mr,,4

<;/,

.h establish the methods for accomplishing'these tasks.

Q

Lfs,

_14 -

, , ,

?. i p2

'1 he purpose _' f the NRC inspection pas to determine if the

1-

T

o

.-

Q,'M' h . ll ,

l*

.gprocessi'ng of the electrical issues complied with,the

"

t

-

N ' rf

requirements set by the CPRT Policies and Guidelines.

The,

.

.

.

,

-

L % ..

inspection covered.four of the guidelines; i.e., (a)' central and

'

'

'

.

. "$f

_

-

working' files, (b)~ safety significance evaluations :(SSEc),

^

'

gg ^ . o' '.

"t

f(c). developing campling plans and random samples for TRT, issues,

,

~

7

,6

'?

. #and-(d) policy on testing and inspection personnel used'in third <

,2 -

e

3

perty verification activities.

This report completes the NRC's '

.;

initial inspection'of programmatic implementation in the area of'

,

l _.

-q m

-h

electrical' issues;,

~

s

~

,

.<u

,.

V 'i /

yQ y

P

.

x wa,

I

J+

'

f

A

3

.-

63e's

g

]

, I: :

e

,

.?

.k

E. g.

-

.

,

'

y'.

'

,

i

4

<

,n.

,

,

,.

.

,

Us

~

'

6

e

,

,

s

,,*I,vp

'$ , _

,,

~

~ 7

,

~ , i)

[

I #

c -

.

.

., ,

,

,

f

's

6

' "

S

_mt

-

-

.'

'

, ._

,

,

J,,.

.

.

,

.

.

\\

-10-

<

~

-

'

x

!

(a) Working Files: ,The working files system and subject matter

,

breakdown being used is as described in the CPRT

g

-guidelines. A file index_is available for each ISAP which

'

j

defines the contents of each file folder.

A computer based

O

data system is being established for these files.

Two'

files were che'ck'd for compliance with the CPRT Policies

e

,

and Guidelines.

. No NRC deviations were identified.

'

'

.,

(b) SSE: -The NRC inspector reviewed the. processing of ISAP

'

No. I b.1 that resulted in one item which will require a

SSE. 'This'SSE'will be. included in the review process for

all-SSEs generated by the CPRT

e

No NRC deviations were identified.

~

(c) ' Sampling Plan:

The sampling plan used on ISAP No. I.a.1

T-

was reviewed by the NRC inspector.

It complied with the

guidelines and was well; documented.

Inspection confirmed

that the information on the random sampling selection was

turned over to ERC, who prepared the inspection packages,

performed the inspections, wrote inspection, reports (irs)

for satisfactory and unsatisfactory conditions, and after

checking and signoff by two levels of supervision transmitted

'

the irs to the electrical issues RTL.

.The RTL sent unsatisfactory irs to TUGCO, who evaluated the

irs and sent a memorandum back detailing the disposition of

each IR.

NCRs were written by TUGC0 on those where

discrepancies existed.

Memoranda were sent explaining why

each of the remainder were not considered as discrepancies.

The NRC inspector also reviewed implementation of the

random sampling system used for ISAP Nos. I.a.2 and I.a.3.

-

No NRC deviations were identified.

-(d) Personnel Requirements:

Qualification requirements for

RTLs and issue coordinators are defined in Section VII of

.the CPRT Program Plan, "CPRT Objectivity Guidance." The

,

primary requirements are:

(1) experience and knowledge in

'

the review subject matter, (ii) experience in managing

technical projects and reviews, and (iii) integrity and

objectivity based on lack of previous involvement in the

CPSES project activities.

l

>

o

r :-.. a ...

-

=

,

,

g

5

a

.s '

r >

.

'

11-

-

The resumes and signed objectivity statements for the

principal individuals involved in the electrical ~ issues

were: reviewed.

No NRC deviations were identified.

(2)-Testing' Issues: The purpose of the NRC inspection was to

determine if the disposition of testing concerns complied with

the CPRT, Policies and Guidelines.

The four guidelines discussed

"

in paragraph 5.c.(1) above were used to perform this inspection.

This report; completes the NRC's initial inspection of

programmatic implementation in this area.

~

(a) Working Files:

The file system and subject matter

breakdown in,use were reviewed.

A file index was available

for each ISAP which defined the contents of the file

folder.

The file index was checked against the contents of

,.

l

the file for these files.

No NRC deviations were identified.

(b) SSE: One DR has been written and an SSE completed.

The

NRC inspector reviewed the processing of this DR.

-,

-

No NRC deviation: were identified.

(c) Sampling Plan:

The sampling plan described in the program

plan was not found to be feasible,.so an alternate plan was

~ developed. This revised plan was described in an appendix-

to the results report. This pract1ce is permitted by

-

Appendix D of the CPRT Program Plan.

No-NRC deviations were identified during a review of the

original and revised sampling plans.

,,

(d) Personnel Requirements: The resumes and signed objectivity

statements for the RTL and each of the three issue

coordinators were reviewed.

,

,

"

No additional NRC deviations to that noted in NRC

Inspection Report No. 50-445/85-11, 50-446/AS-06 were

identified.

'

'

. .

\\

-

,

4 '

.

.

t

-

-

e-

6

+

'

- - - - .

. .

. . . - - - -

,__

.

. - . .

-

-

.

- - -

- . -

-

- - . .

.

- - - - . -

-

-

-

_

.

8

,.

-

-12-

6.

CPRT ISAPs (Excluding ISAP No. VII.c)

a.

Inspection Reports on Butt Splices (ISAP No. I.a.2) and Butt Splice

Qualification (ISAP No. I.a.3)

Status of CPRT Activity

Phase II of ISAP No. I.a.2 has been completed with the following

findings:

(1) No undocumented butt splices were identified during the

inspection of 38 cabinets which were supposed to be free of

,

splices;

(2) A total of 603 butt splices were identified during the

inspection of 26 cabinets and 25 motor control centers, which

from documentation were supposed to contain 648 splices.

This

difference resulted because 149 of the documented splices were

not installed, but 104 undocumented splices were discovered;

(3) A total of 168 of the above 603 butt splices were found to be

unsatisfactory, either by physical inspection or as a result of

being undocumented;

(4) A total of 80 unsatisfactory butt splices were removed for

testing and replaced; and

(5) A review was performed of 341 irs which were applicable to 286

'

butt spliced cables. This review identified deficiencies in 294

irs; e.g., failure to identify which conductors were spliced,

and after the fact verification of a splice rather than the

required witness.

In addition to finding some unacceptable

splices during the Phase II inspections, some splices documented

in records were found to not be installed.

TUGC0 submitted a

report in accordance with 10 CFR Part 50.55(e) dated

September 26, 1985, concerning the identified deficiencies.

An

interim Corrective Action Report, CAR-050, has been issued.

Status of NRC Inspection Activity

The NRC inspector is continuing to review CPRT ISAP Nos.l.a.2,

Revision 3;-I.a.3, Revision 3; and CPRT Quality Instruction (QI)

QI-002, Revision 4.

"

No NRC violations or deviations were identified.

b.

Electrical Conduit Supports (ISAP No. I.c)

Status of CPRT Activity

TUGC0 has completed an engineering cher:k of as-built drawings for 257

1 1/2-inch and 2-inch conduit runs in the combined random and

.

.-

.

.

---

J

_ __.

._ . .

.

,.

7

. .

"

.

..

-13-

engineered' samples; i.e., 126 random and 131 engineered.

These-

-

drawings have been transmitted to TERA for third party review and to

'-

G&H for seismic analysis.

Seismic analysis has been completed for

-

.

all runs in the random sample and for 128 runs in the engineered

!

sample.

Fifteen conduit runs have been identified, to date, as

'having the potential for interaction with safety related components.

' c-

+

TUGC0 has initiated a dynamic test program at Corporate Consulting

,

'

' .and Development (CCL) in North Carolina.

The dynamic testing will

r

provide actual strengths as compared to the previously used predicted

.;

values. TUGC0 will also conduct a damage study walkdown of all

'

conduit runs currently determined to have potential interactions with

'

l

safety-related components.

Evaluation of potential interactions for

safety significance will utilizo preestablished criteria to be

specified in a walkdown procedure.

This procedure is currently being

prepared by Ebasco.

Third party review of the Unit 1 damage study resolution for greater

'

<

than 2-inch conduit in Train C is being addressed in ISAP.No. II.d.

.

Status of NRC Inspection Activity

A. preliminary review of the Unit 1 large conduit damage study

procedure and related as-built drawings has been conducted.

Resolution of interactions predicted in this study will be reviewed

as part of the NRC inspection program for ISAP No. II.d.

A review of

the CCL test procedure has been conducted.

,

No NRC violations or deviations were identified.

_C Inspector Qualifications (ISAP No. I.d.1)

Q

c.

Status of CPRT Activity

Phase II evaluation of ASME inspector qualifications has not been

completed.

Status of non-ASME inspector qualifications was sent to

the TUGC0 QC Manager by ERC Letter QA/QC-RT-681 on October 4,1985.

Further review by the Special Evaluation Team (SET) has resulted in

some changes to the original' transmittal.

Reinspection is underway

for a seventh inspector p10ced into Phase III.

Package preparation

is complete for an eighth i.1spector.

,

Status of NRM spection Activity

)

During this reporri tg period, the NRC inspector witnessed 24

Phase III reinspections cu ducted by ERC inspectors and also

performed 10 reinspections independent of ERC personnel.

No

,

deficiencies were identified in these.reinspections by either ERC

inspectors or the NRC inspector.

,

6

-

'T

1%

-

- - -

, . _ _

.

-

.

-14-

A concern that the reinspection attributes were very basic in nature

and may not have accurately reflected the work performed originally

by the project inspector was reviewed with the issue coordinator.

This review found that the reinspection did reflect the activity

associated with the inspector's earlier certifications.

No NRC violations or deviations were identified.

d.

Guidelines for Administration of QC Inspector Tests (ISAP No. I.d.2)

Status of CPRT Activity

The SET has completed review of prior revisions to TUGC0 Procedure

CP-QP-2.1, " Training of Inspector Person el."

Comments from their

review have been given to the QA/QC RTL and presented to TUGC0 for

resolution and/or incorporation into CP-QP-2.1. Revision 19 to

CP-QP-2.1 was issued October 4, 1985, and incorporates these

comments.

Inspector cercification examinations have also been

revised to meet the requirements of Revision 19 of CP-QP-2.1.

Review of B&R Procedure ECP-19, " Exposed Conduit / Junction Box and

Hanger Fabrication and Installation," and other procedures affecting

craft training will be conducted under ISAP No. I.d.3.

This issue

was previously included in ISAP No. I.o.2.

Status of NRC Inspection Activity

The NRC inspector reviewed Procedure CP-QP-2.1, Revisions 18 and 19,

to determine if concerns of the NRC Technical Review Team (TRT) were

satisfactorily addressed.

Revision 19 of CP-QP-2.1 was found to

address the TRT concerns noted in ISAP No. I.d.2, including inspector

familiarization or training for changes in QC inspection procedures.

This action closes open item 445/8513-0-06.

The NRC inspector reviewed five recently administered QC inspector

examinations.

These were found to comply with the requirements of

CP-QP-2.1 for written examinations.

No NRC violations or deviations were identified.

e.

Inspection for Certain Types of Skewed Welds in NF Supports

(ISAP No. V.a)

>

Status of CPRT Activity

Reinspection of the random sample of 60 ASME Section III, Subsection

NF pipe supports containing 99 type 2. skewed welds has been

completed.

Disposition of the 12 TUGC0 NCRs associated with the

undersize type 2 skewed field welds has not been made.

-

g ,4

N ;, l

^

f }.

~

'

,

,

.

. 3

,

"

. .,

.

?

.

,

.

% -

y .

.

,,

<

m

'

a

,

T

1

}

'

[ -15-

'

o.

.

~

a

Status of NRC Inspection Activity

'

,

The NRC' inspector. witnessed'a total.of nine reinspections and

performed three independent inspections of NF supports containing

.

type _2 skewed welds. -The< results 'of NRC Region I inspections of

skewed welds are documented in NRC Inspection Report ~

No. 50-445/85-13; 50-446/85-09. The planned NRC physical inspections

'

for this ISAP have now'been completed.

NRC evaluation of TUGCO's

--

3

~ dispositions of 12 undersize type 2Lskewed field ~ welds is dependent

,

upon the processing of;the associated NCRs. This remains an open

-

^

,

'

item (445/8511-0-04).

One violation waslidentified in this subject area which'is identified

'

7

-

,

in paragraph 2.'a of this-appendix.

'

3

,

s'

c

>

f. - Plua Welds (ISAP No. V.d)

!

'

.

-

- .

.

. Status of CPRT Activity

'.

u

,

.

,

, '

'

Reinspection has been completed for the presence of plug welds. in two

'

,

random samples of' cable tray hangers, consisting of 60 from Unit-1

l

"

and 61 from Unit 2. The reinspection resulted in the identification

u

,

t

of 23 plug welds in 14 cable tray hangers.

Documentation was

'

,

,

reviewed for all cable' tray hangers containing plug welds. The

.

,

resultslof this re'iew showed that'all of the plug welds were

v

authorized and documented.

Due to a mix of non-ASME component supports

d.

.-

-

s

with'ASME Section III NF component supports in the two original

-

l

^ -

, . li:

'~

/

random samples (see item A,, Notice of Deviation, NRC Inspection

l

'

4

<

9

j _

Report No.'50-445/85-13, 50-446/85-09), a new random sample of 57 NF

'

,

'

component supports has been created and reinspection has I,een

'*

initiated.

i

r

!

.

,

' -

s

Status of NRC Inspection Activity

l

'

Th' NRC' inspector witnessed 23 reinspections and performed 6

e

-

independent. inspections of cable tray hangers. With respect to NF

. - '

J

component supports, the NRC inspector has witnessed'a total of 23

.reinspections and performed a total of 4 independent inspections.

L

Eight of.the witnessed reinspections and one independent inspection

'

occurred in this report period and were from the new random sample.

';

Indications of possible plug welds were identified in two component

, support base plates during-the witnes:;ed inspections.

The NRC-

'

inspector will witness the macroetching and inspection of these

t

-

baseplates to determine whether or not plug welds exist.

No NRC violations or deviations were identified.

- <

,

.

.l

'

-

.

.

'

m

e

'

'

s

,

5

  • i

,

5

a.

y

,

,

x-

.

.

.

.

.

.

- -

-

- .

.-.

.-

o

..

-16-

,

~

.g.

Installation of Main Steam Pipes (ISAP No. V.e)

Status of CPPT Activity-

+

'The specific engineering investigation of the main steam line

4

installation is, complete and is undergoing review.

The report

describing the ' analytical evaluation of stresses and support load

changes has been issued by R. L. Cloud & Associates (RLCA) and has

t,een reviewed by TERA.

Review and revision of pipe procedures for

pipe erectior. and placement of temporary and permanent supports, as

well_as engineering significance of these procedures, is also

'

complete.~ The TERA draft results report is still being reviewed.

.

Status of NRC Inspection Activity

.

The RLCA report addressing the installation of main steam pipes has

been reviewed for adequacy with respect to the methods of analysis.

The review included supporting computer output, calculations, piping

models, and assumptions made.

During this review the following

conditions were noted:

-

(1) While the use of a "come-along"' for horizontal adjustment is

mentioned in Section 1.3, " Additional Background," it is not

addressed in the analytical portion of the report.

(2) The 18-inch bypass line is modelled in as a schedule 60 pipe,

but drawing FSM-00165 specifies a schedule 40 pipe.

Documentation was not available to substantiate that a schedule

60 pipe was used.

Even though the schedule 60 piping is

conservative as far as stress is concerned, it will have some

impact or, other conclusions made in the report such as vertical

displacements.

(3) Figure 3-12 in the analysis does not represent computer output

No. RLCA P142-1-551-018, in that the node numbers do not

correspond.

(4) The NRC TRT identified that sagging occurred during flushing

operations.

RLCA states that sagging occurred before flushing.

The date of the flushing should be established.

The above conditions constitute an unresolved item (445/8514-U-13).

No NRC violations or deviations were identified.

,

4

,

_ _.

,

,_ _

._

,

,

.

,

_

,

[G

'I *

_

'

.

li

-17-

i

s

,

.

h.

Material Traceability (ISAP No. VII.a.1)

'

'

' Status of CPRT Activity

<

'

'

The issue coordinator is receiving input from ISAP Nos. VII.c and

VII.b.3.

This information aids in the assessment of the overall

material traceability control systems.

Heat numbers on steel items

such as supports and piping are being checked as part )f the

reinspections to establish traceability.

Status of NRC Inspection Activity

The NRC inspector has reviewed ISAP No. VII.a.1.

This review found

that the overall material traceability control system was to be

evaluated for adequacy.

Preliminary results of ISAP No. VII.c

reinspections indicate that data on material traceability in areas

other than steel is not being compiled.

This lack of data could

adversely affect the assessment of the material traceability control

systems. This matter is considered to be an unresolved item

(445/8514-U-14).

No NRC violations or deviations were identified.

i.

Housekeeping and System Cleanliness (ISAP No. VII.a.7)

Status of CPRT Activity

This ISAP addresses two specific TRT concerns and performs an

overview of the program on housekeeping and system cleanliness.

Eleven plant surveys conducted by TUGC0 and overviewed by ERC

inspectors have been completed.

The issue coordinator has reviewed

the procedural controls to de~cermine if requirements of

Criterion XIII of Appendix B to 10 CFR Part 50 and the FSAR are

included.

Inputs from ISAP Nos. II.c, V.b, VI.a, and recent

TUGC0/B&R audit reports, surveys, and other quality documents are

being reviewed to evaluate the effE;tiveness of the current program.

. Specific TRT concern on the number of chloride residue. swipes made on

the wall and bottom of the reactor vessel has beerr investigated.

Tha.

procedure controlling this activity required two swipes to be made,

but the file documentation shows that eight swipes were made and

.

found acceptable.

Flush plan.FP-55-08, the controlling procedure, is

.

, a specific one-time procedure.

Ther fore, no revision to this

procedure is being made.

Comments on the adequacy of the number of

,

'

'

swipes made will be~in the results report.

Specific TRT concern o'n lack of protective covering on equipment near

'

welding activities will be addressed by reviewing the results of

l

.

plant surveys.

w

,

4- .

.

.

'

i

'

'i

j

.'

,

-

.

-

-

u..

.,

.

.

-18-

-

Status of NRC Inspection Activity

,

The NRC inspector has witnessed plant surveys of the safeguards

building, Unit 2 reactor area, millwright shop, and ironworkers shop.

'

During these surveys, items.such as trash or unidentified material

were found in laydown areas where Quality (Q) material was stored.

These items were noted by TUGC0 and ERC personnel. . An independent

NRC resurvey of these areas found that the noted discrepant

conditions had been restored to requirements.

The NRC inspector reviewed the file for FP-55-08' to verify that the

eight chloride residue swipes had been taken for the reactor vessel

wall and bottom.

These swipes were found to be documented as

performed and acceptable.

In addition, numerous swipes had been

,

taken on reactor internals and the hot and cold legs.

These were

also acceptable.

No NRC violations or deviations were identified.

j.

Valve Disassembly (ISAP No. VII.b.2)

Status of CPRT Activity

p

A second reinspection of seven Borg-Warner (8-W) valves was conducted

using B-W serial numbers for body and bonnet identification.

This

reinspection was necessitated by the fact that identification numbers

used in the initial reinspection were traceable to material heat

numbers, but were not necessarily unique to each valve bonnet or

body.

No DRs were issued as a result of the second reinspection.

All reinspections are now complete.

Of a total of four valid DRs

issued for this ISAP, three SSEs have been completed.

The fourth DR

(VALV-9-1) identifies a mismatch between the identification numbers

observed on the valve bonnet and that which is listed in the QA/QC

documentation package for the valve.

QA/QC documentation for the

actual installed bonnet has not been located to date.

A difference was identified by the SSE engineer between the

respective design temperature and pressure listed by G&H and those

listed by Westinghouse for the Chemical Volume Control system.

'

Specifically,theg&Hlinedesignationtableliststhedesign

temperature as 250 F and the design pressure as 300 psi, while the

i

correspondingWestinghousedgsigntemperatureandpressureare

listed, respectively, as 150 F and 150 psi.

The NRC inspector was informed by the SSE~ engineer that disposition

of the remaining SSE is pending receipt of information from TUGC0

regarding valve temperature / pressure. ratings and TUGC0 resolution of

,

the above described difference in design conditions.

'

.

9

-

-

,

!

.

.

r - .

1.'

-19-

s

Status of NRC Inspection Activity

A total of eight reinspections have been witnessed by the NRC

inspector, one of which was a reinspection of a B-W valve during this

report period.

Independent NRC inspections have also been performed

on five valves in the combined random and engineering samples.

The NRC inspector was informed by TUGC0 Field Mechanical Engineering

personnel that: (1) the previously described differences between G&H

and Westinghouse design conditions had also been identified by TUGCO,

'

and (2) a comparison of G&H and Westinghouse design conditions for

' mechanical equipment had been conducted by TUGC0 which resulted in

the identification of several. design pressure and temperature

differences.

The NRC inspector also noted that NCRs have.been written by TUGC0 for

several valves having temperature and/or pressure ratings listed on

the Code Data Log that are different from those listed in the G&H

line designation table.

It was not immediately apparent whether or

not the Westinghouse /G&H comparison study had also identified these

differences.

Verification of the adequate resolution of differences identified in

"

the Westinghouse /G&H comparison study and those identified in NCRs is

,

considered unresolved and will be evaluated further during a

subsequent reporting period (445/8514-U-15).

No NRC violations or deviations were identified.

7.

ISAP No. VII.c

a.

Electrical Cable

Status of CPRT Activity

ERC has completed 85 reinspections and 71 documentation reviews of

sampled electrical cable as of October 30, 1985.

Status of NRC Inspection Activity

(1) The following eight ERC reinspections of sampled electrical

cable were witnessed by the NRC during this report period:

Verification Package No.

Cable No.

I-E-CABL-078

EG113538

I-E-CABL-084

EG104608

.

--

--

.

.

-20-

'

,

I-E-CABL-086

E0121816Z

I-E-CABL-088

E0124088

I-E-CABL-089

EG123639Z

I-E-CABL-098

E0145694

I-E-CABL-101

E0122951

I-E-CABL-102

EG139519

' (2) Ouring the above reinspections, ERC identified the following

conditions to the NRC inspector as subject to evaluation as

potential deviations:

(a)

I-E-CABL-037:

Two through-the-wall sleeves had identical

identification tag number TWS-E-010.

The cable run also

deviated from the cable run schedule.

(b)

I-E-CABL-084:

Cable run deviated from the cable run

schedule and cable was routed through C13G06325 instead of

C13G06324.

(c)

I-E-CABL-098: There was no identification tag on the

conduit nipple.

Cable E0145694 was found to not have the

required 2 inches of slack in free air as it exited conduit

C13016044 into cable tray. A hold tag with NCR

E85-101141SX had been placed on the conduit as a result of

a prior inspection identifying the same condition.

Dispositions of the above findings are open items (445/8514-0-03

through 445/8514-0-05).

(3) ERC also noted the following deficiencies outside the defined

inspection scope:

I-E-CABL-086:

Conduit was 1 1/2 inches instead of the 2-inch

size specified and a loose conduit coupling was'noted where

conduit penetrated a wall.

Dispositions of the above findings are an open item

(445/8514-0-06).

.

(4) NRC inspectors did not identify any additional discrepancies

with respect to the above eight packages.

l

.

.

4

%

I

h,

- -

,

-21-

4

(5) Independent documentation reviews were performed of 10

verification packages comprising 22 cables.

The results of the

'

independent reviews are an open item pending NRC review of ERC

,,

results (445/8514-0-07).

(6) The NRC inspector noted that NCRs have been written by TUGC0

QA/QC personnel in regard to potential electrical cable damage

resulting from installation practices used for cable support

'

grips. TUGC0 engineering has provided information to assist in

the disposition of the NCRs.

This matter is considered

unresolved pending review of supplemental information from TIIGC0

and will be evaluated further in a subsequent report

(445/8514-U-16).

b.

Cable Trays

'

Status of CPRT Activity

ERC has completed 84 reinspections and 78 documentation r views of

sampled cable trays as of October 30, 1985.

Status of NRC Inspection Activity

(1) The following two ERC reinspections of sampled cable trays were

,

'

witnessed by the NRC in this report period:

Verification Package No.

Cable Tray No.

I-E-CATY-201

T220SBC89

I-E-CATY-247

TBGCCM62

4

-

No deficiencies were noted by ERC or NRC inspectors during these

. inspections.

(2) The NRC performed independent reinspections of two electrical

cable trays.

The results of these inspections are open-items

pending NRC review of ERC inspection results and documentation

'

reviews (445/8514-0-08) and (446/8511-0-12).

(3) The NRC performed independent documentation reviews of seven

verification packages for seven cable trays.

The results of

these reviews are an open item pending NRC review of ERC review

results (445/8514-0-09).

j

No NRC violations or deviations were identified.

'

'

.

.-- --

- _ ,

-- .

__

_

_ _ - -

.q.

'

s

-22-

c.

Electrical Conduit

Status of CPRT Activity

ERC has completed 79 reinspections and 76 documentation reviews of

,

sampled electrical conduit as of October 30, 1985.

Status of NRC Inspection Activity

(1) _The following two ERC reinspections of sampled electrical

conduit were witnessed by the NRC in this reporting period:

Verification Package No.

Conduit No.

I-E-COUT-089

C13G07757

I-E-CDUT-098

C12020693

.

No deficiencies were noted by ERC or NRC inspecturs during these

inspections.

(2) The NRC inspectors performed independent documentation reviews

of the following verification packages for sampled electrical

conduits:

Verification Package No.

Conduit No.

R-E-CDUT-007

C13010190

R-E-C00T-051

EAB1-1

R-E-CDUT-064

C13016037

R-E-CDUT-070

C14R13047

R-E-CDUT-076

C12008750

R-E-CDUT-077

C13005532

R-E-COUT-086

C13030044

R-E-CDUT-089

C13G07757

R-E-CDUT-098

.C12020693

During the above documentation reviews the NRC inspectors

observed the following deficiencies:

(a) Lighting conduit EAB1-1 was physically reinspected by ERC

and witnessed by NRC.

ERC subsequently discarded this item

from the sample of conduit population,.because not enough

attributes were accessible for inspection.

The NRC

inspector performed an independent documentation review of

this field witnessed activity and noted that the TUGC0

electrical inspector, who signed the final irs E-1-0027419

and E-1-0024951 for conduit EAB1-1, was not certified to

Procedure QI-QP-11.3-25.

TUGC0 Procedures CP-QP-2.1 and

QI-QP-2.1-3 require that inspection personnel be certified

,

%'

n

..

_

-.

-

-

-,

.

(

l

' '

s

r

,

-23-

for a given inspaction function / activity as being qualified

,

to perform their assigned tasks.

The lack of certification

of the ThiC0 electrical inspector performing the inspection

,

-

of record for conduit EAB1-1 is a violation

(445/8514-V-04).

'

(b)

ISAP No. VII.c requires original documentation review for

attributes deemed to be inaccessible.

A portion of conduit

C13616037 was found to be inaccessible during reinspection

as a result of being covered with separation barrier

,

material (SBM).

There was no evidence in ERC's

'

,

Verification Package No. R-E-CDUT-064 that a check was made

for attributes which were not accessible due to SBM

'

installation.

This is an NRC deviation (445/8514-0-02).

(c) QI-009, Revision 0, " Document Review of Conduit /R-E-CDUT,"

requires the reviewer to record the SBM IR and/or latest

-construction operation traveler number at the bottom of the

checklist.

The checklist for conduit C13016037 in

Verification Package No. R-E-CDUT-064 did not contain this

required documentation.

This item is an NRC deviation

(445/8514-0-03).

(d) QI-009, Revision 0, " Document Review of Conduit /R-E-CDUT,"

also requires the ERC inspector to verify that irs signed

by electrical inspectors were " dated after their date of

certification and prior to their date of expiration."

ERC Verification Package No. R-E-CDUT-070 for conduit

C14R13047 failed to indicate that the ERC inspector

observed that the electrical inspector signing IR-E-46087

was not certified to QI-QP-11.3-23 on the date of

inspection.

This item is an NRC deviation (445/8514-0-03).

(e) During this review, the NRC inspector observed that TUGC0

inspection procedures (i.e., QI-QP-11.3-23 and

QI-QP-11.3-23.11) for conduit did not require inspection

for separation between approximately September 1979 and

November 1983.

The NRC inspector was informed that a

decision was made to inspsct conduit for separation af ter

construction completion, on a room-by-room basis.

The NRC

inspector was also informed that this activity is

prescribed in QI-QP-11.3-29 and that documentary evidence

is available in the Permanent Plant Records Vault (PPRV),

filed by area or room " turn over" numbers.

This item is considered unresolved pending review of this

documentation (445/8514-U-17).

,

,

.

w

-_ .

.

_ . _ .

_

_

_

..

'

(

'

i

.,

24-

-

(f) The NRC inspector observed during documentation review of

conduit C13016037 that the ERC inspector did not review

construction operation traveler EE83-0997-8904 for other

than inspector certification and correct QI reference on

the traveler,

it was also noted that construction

operation travelers EE84-10324-8904, EE84-10505-8904,,and

'EE85-11255-8904, in response to Item Removal Notices (IRNs)

for SBM removal and replacement, were not reviewed to

ascertain the certification status of any additional

inspectors that had been used to those that signed the

applicable irs.

This item is unresolved pending NRC review

of construction operation traveler documentation in the

PPRV (445/8514-U-18).

(g) The NRC inspector reviewed documentation for six other

conduits. ERC reviews were scheduled but had not been

completed. The results of these review:; will be reported in

a subsequent report after comparison of NRC review results

with the completed ERC results. This is an open item

(445/0514-0-10).

(h) The NRC inspector observed that documentation reviews for

lighting conduits could not be performed by ERC because

QI-009, Revision 0, does not address the relevant QIs;

i.e., QI-QP-11.3-25 and QI-QP-11.3-9.

This is an open item

pending the issuance of new instructions or a subsequent

revision to QI-009 (445/8514-0-11).

d.

Electrical Equipment Installation

,

Status of CPRT Activity

ERC has completed 20 reinspections and 19 documentation reviews of

sampled electrical equipment installations as of Octouer 30,

1985.

This reinspection total is lower than the number (i.e.,21)

reported in NRC Inspection Report No. 50-445/85-13, 50-446/85-09 as

being performed by September 20, 1985.

The difference arose as a

result of revision to QI-010 and institution of re-review of

previous.j completed packages for compliance to the revised QI.

Status of NRC Inspection Activity

(1) The following ERC reinspection of, sampled electrical equipment

installation was witnessed b/ the NRC:

'

-

I

'

,.

.

-

>

a

,

-25-

,

Verification rackage No.

Equipment No.

I-E-EEIN-059

CP1-ECDPEC-12

No deficiencies were noted by ERC or NRC inspectors during this

inspection.

(2) The NRC performed an independent documentation review of one

l

sampled electrical equipment installation. The results of this

review are an open item pending comparison with ERC results when

i

available (445/8514-0-12).

No NRC violations or deviations were identified.

e.

Instrumentation Equipment Installation

l

l

Status of CPRT Activity

l

ERC has completed 75 reinspections and 75 documentation reviews of

l

sampled instrumentation equipment installations as of October 30,

l

1985.

'

<

Status of NRC Inspection Activity

(1) To date, eight reinspections have been witnessed by NRC

inspectors with the following five reinspections witnessed in

this report period:

Verification Package No.

Unit No.

!

I-E-ININ-072

1

l

'

I-E-ININ-079

1

I-E-ININ-069

1

I-E-ININ-076

1

I-E-ININ-066

1

(2) During the above reinspections, ERC identified the following

conditions as subject to evaluation as potential deviations:

I-E-ININ-072:

,

(a) G&H Specification 2323-MS-625 and QI-012, Revision 0,

,

require a slope for process wetted lines of 1 inch per foot

minimum, except that where physical layout is a problem the

minimum slope may be reduced to 1/4 inch per foot.

The

tubing line from the root valve to the instrument was found

to only have a slope of 1/2 inch on 9 inches and physical

layout did not appear to be a problem.

'

(b) Drawing 2323-M1-2613, Revision 2, shows instrument

1-P15-4251 as being located 6 feet 0 inches off the wall.

t

.

.

. . . .

.

.

.

.

. .

. .

.

.

.

.

.

.

,

-

--

-

_ _ _ _

--.--- - - _ _ _ _ . -

--_ - _ _

-

-

_ _ - - - - _ - - _ -_

- - - - . _ _ _ - . -

g

c*

_p

'

,

'

i

-26-

.

This instrument was actually.Incated 5 feet 0 inches off

'

the wall.

<

.

A"

I-E-ININ-079: The tubing line from the component cooling water

.

pump 1A to !nstrument 1-PT-4520 had reverse slope where it

' " '

passed under the discharge line.

,

s

I-E-ININ-066: Required color code was missing and maximum

allowable distance between color code marks' was exceeded.

'

'

I-E-ININ-069:

Sending units 1-LS-6712 and 1-LS-6717 were found

to be "eversed.

s.

Dispositions of the above findings are open items (445/8514-0-13

through 445/8514-0-16).

(

No NRC violations or deviations were identified.

,

t

.

(3) ERC also noted the following deficiency outside of the defined

'

inspection scope:

l.

I-E-ININ-079: C1413591 was damaged at the connection to the

j

instrument 1-PT-4520.

Disposition of the :above finding'is an open item

l-

(445/8514-0-17).

.

No NRC violations or deviations were identified.

(4) The following independent ddcumentation reviews of sampled

instrumentation equipment installations were made by the NRC

inspectors:

'

l

,

Verification Package No.

Instrument No.

,

'

R-E-ININ-005

1-LS-4795

R-E-ININ-060

1-LS-3376

-

,

l

(a) During the review of these packages, the NRC inspector

noted that the procedure used (i.e., QI-013, Revision 4)

'

did not provide detailed instructions for checking original ~

,

".

documentation for attributes which were inaccessible or

'

' '

nonrecreatable during the physical inspections of these

i

instrument installations.

According to paragraph 4.1 of

ISAP No. VII.c Revision 0, documentation reviews will be

' '

-

utilized to supplement reinspections for attributes which

s

Pre nonrecreatable or inaccessible.

Paragraph 4.1.3 of the

)

same ISAP requires procedures to have detailed instructions

t

,

,

,

,

a

i

'

>

_

,

g

.

'

." e

,

,

.

.

_.

,

.

3

h

'

e i <

.

<

)

.

-27-

j.

!~

for the document reviewers.

QI-013, Revision 4, " Documentation.

Review for Instrumentation Equip R-E-ININ," did not list

specific attributes to be verified during documentation

review, but rather required verification of installation in

accordance with one or more of a listing of TUGC0 procedures.

Applicable procedure revisions were not defined.

The

number of inaccessible and/or nonrecreatable attributes may

vary between different revisions of a procedure.

As an

example, Revision 1 of QI-QP-11.8-8 adds to Revision 0

requirements an inspection checklist addressing verification

of: (i) color codes for nuts; (ii) flange face cleanliness;

(iii) gasket size, rating, and material type; (iv) nuts

being tightened in a diametrically opposite sequence; (v)

studs being the sane length; (vi) proper alignment and

fitup of flange and gasket; and (vii) sufficient gasket

compression.

The absence of instructions to the document

reviewer on procedure revisions to be used can thus result

in insufficient guidance with respect to inaccessible and

nonrecreatable attributes.

This is an NRC deviation

(445/8514-D-02).

'

~(b)

In the review of Verification Package No. R-E-INIh-060, the

NRC inspector noted that the original inspection was

performed by a TUGC0 inspector whose certification to

QI-QP-11.8-7 could not be verified.

TUGC0 is currently

investigating the missing certification documents.

This

matter is an unresolved item (445/8514-U-19).

(5) Independent reinspections were performed by the NRC inspector on

Verification Package Nos. I-E-ININ-04 and I-E-ININ-026, with the

following results:

I-E-ININ-04:

Required bend radius verification was not

performed by ERC inspectors.

I-E-ININ-026:

ERC inspectors did not idantify that: (a)

required color coding on six sections was missing, (b) incorrect

slope was present, and (c) an incorrect air gap condition was

present.

.

H

The failure of ERC inspectors to identify the above conditions

is an NRC deviation (445/8514-D-04).

f.

HVAC Ducts and Plenums

.

Status of CPRT Activity

As of October 25, 1985, reinspections have been completed for 62 of

95 random items in the HVAC ducts and plenums samples.

The

<

~

s

-

m

_ _ .-

.

-

..

,

,

'

-28-

reinspections have identified conditions which necessitated the

issuance of 75 ors, 38 of which have been validated.

Twelve DRs have

been ovaluatea by ERC and were found to be'nonsafety significant.

A

number of deviations dealt with companion angle welds and include

insufficient weld length,' undersized welds, excessive stitch weld

spacing, weld cracks, and incomplete weld fusion. Other deviations

involved seal weld undercuts, lack of full face connecting

flange / gasket contact, level 3 flanged joint installed instead of the

specified level 2 (as defined by G&H specification 2323-MS-85), loose

vent lock caps, level 2 construction instead of the specified level 3,

lock washers not installed on vent lock mounting screws, deteriorating

connecting flange gasket, and seal weld not touched up with paint.

.

!

Status of NRC Inspection Activity

(1) ERC methods and related documents used in establishing the

population items list were reviewed for population

-

inclusiveness.

Completed SSE reports are cur *ently being

reviewed by the NRC inspector.

As of October 25, 1985, eight

reinspections have been witnessed by the NRC inspector, of which

,

the following four were witnessed during this report period and

are listed below by Verification Package No.:

Verification Package No.

Ur,t No.

r

'I-M-DU'.-021

1

I-M-DUPL-073

1

I-M-DUPL-084

2

I-M-DUPL-086

1

(2) During the'above reinspections, ERC identified the following

conditions to the NRC inspector as subject to evaluation as

potential deviations:

'

I-M-DUPL-021:

Some duct connecting flange bolts were bent.

No

corner welds existed on duct connecting flanges and a connecting

-

flange bolt hole was excessively large.

I-M-DUPL-073:

All vent lock caps were loose and companion angle

,

bolt hole center-to-center distance was excessive on both ends

of the duct section.

I-M-DUPL-084:

Duct connecting flange corner weld lengths were

less than the specified dimension.

-

-

- __

-

.

^

,

,

-29-

s

.

I-M-DUPL-086:

Approximately 4 inches of duct seam were not

welded.

Dispositions of the above findings are open items (445/8514-0-18

and 445/8514-0-19, 446/8511-0-03, and 445/8514-0-20).

,

,

(3) The following potential out-of-scope deviation was also

< identified by ERC:

,

I-M-DUPL-073:

An additional hole was drilled in the companion

.

.

angle flange and this hole was partially filled with sealant.

Disposition of the above finding is an open item

(445/8514-0-21).

(4) For all witnessed reinspections, the ERC inspector did not

measure duct gage thickness which was a required attribute.

The

NRC inspector was informed by ERC that such measurements were

not possible due to inaccessibility to the inside of the duct.

The NRC inspector concurred with this position.

,

No NRC violations or deviations were identified.

g.

HVAC Equipment Installation

Ststus of CPRT Act*vity

,

As of October 25, 1985, reinspe-tions have been completed for 38 of

89 random items in the HVAC equ v.t.ent installation samples.

The

reinspections have identified conditions which necessitated the

issuance of 68 DRs, none of which have been currently vr.lidated.

Reinspection was on hold for approximately one week, pending a change

notice.to QI-023, Revision O.

This change notice involved changes in

. the following areas: (1) the method of verifying companion flange

bolt tightness and gasket compression, (2) inclusion of verification

of full thread engagement between companion flange bolts and nuts,

(3) companion flange bolt centerline to flange edge distance

requirements, and (4) the mtthod of certification of gravity damper

counterweighc balance.

Previously reinspected items will require a

followup reinspection, where apslicable, as a result of this

revision.

The NRC inspector was informed by the ?opulation en0 neer that the

i

HVAC equipment installation plan will be revised to incorporate two

distinct populations, each requiring a minimum sample size of 60.

l

One population will include all HVAC equipment installed by Bihnson

.

Services. Inc., while the others will include all HVAC equipment

installed by B&R.

This change will not necessarily invalidate any

o

e

1

y=

.-

-

.

.- .

_

-

+ '

-30-

-

,

reinspections conducted to date, but could effectively double the

total number of items to be reinspected in the initial sample.

Status of NRC Inspection Activity

(1) As of October 25, 1985, a total of four reinspections have been

witnessed by the NRC inspector, all of which were witnessed

during this report period and are listed below:

Verification Package No.

Unit No.

I-M-HVIN-017

1

I-M-HVIN-038

2

I-M-HVIN-040

1

I-M-HVIN-043

1

(2) During the above reinspections, ERC' identified the following

conditions to the NRC inspector as subject to evaluatien.as

potential deviations:

.

I-M-HVIN-017 (Filter):

Three bolts on the. inlet duct connection

did not have lock washers installed.

I-M-HVIN-038 (Fan): (a) The exhaust flange gasket did not cover

.the entire flange area, (b) the gasket was also unevenly

compressed, and (c) some lockwashers on exhaust connecting

flange bolts did not have full contact with the flange.

Similar

conditions were identified by the ERC inspector for the inlet

duct connection.

I-M-HVIN-040 (Fan): (a) Inlet and c,utlet duct connection gaskets

had low and uneven compression, (b) diameters for foundation

anchor bolts and duct connection bolts were 11'iegible in

drawings provided in the inspection package, and (c) exhaust

duct connection bolts did not have full thread engagement with

r.uts .

I-M-HVIN-043 (Motor Operated Dawer):

(a) A nameplate was not

observed on the equipment, and (b) the actuator spring could not

be located which is required for vertfication of fail closed or

fail open positions.

Dispositions of the above findings are open items

(445/8514-0-22, 446/8511-0-0A, 445/8514-0-23 and 445/8514-0-24).

(3) The following potential out-of-scope deviation was also

identified by ERC-

l

i

,

m.

_ _ _

_

-- .

_.

_

_

,

_-

j

-

,

,

l

-31-

.

I-N-HVIN-043:

Some of the bolts attaching the actuator to the

mounting bracket did not have full thread engagement.

'

.

Disposition of the above finding is an open item

(445/8514-0-25).

No NRC violations or deviations were identified.

'

h.

Large Bore Piping Configuration

Status of CPRT Activity

As of October 25, 1985, reinspection was complete for 65 of the 99

random sample large bore piping configuration items. The

reinspections identified conditions which resulted in the issuance of

34 DRs,18 of which, to date, have been validated and are undergoitig

an evaluation by ERC for safety significance.

Tiie NRC inspector was informed by the population engineer that the

population items list is currently being revised to exclude all items

not having an "N-5" designation on the piping isometric drawings.

One exception will be certain safety-related piping in Unit 1 that

4

has been exempted from "NA" code stamping requirements.

The NRC inspector was informed that the above' described revision to

the population items list is required in order to ensure that all

CPRT reinspection items had been previously inspected and accepted by

construction QC.

Approximately 24 previously reinspected items will

be excluded from the reinspection samples as a result of this

i

revision.

Deviations have involved incorrect flow direction orientation of an

orifice plate, insufficient clearance with adjacent piping and

equipment, a different part number on a valve to that shown on the

isometric drawing, linear and location measurement differences,

insufficient sleeve clearances, missing code data plate, and flow

direction not marked on the valve.

Status of NRC Inspection Activity

ERC methods and related documents used in establishing the population

items list were reviewed for population inclusiveness.

Completed S$F

reports are currently being reviewed by the NRC inspector.

As of -

October 25, 1985, four reinspections have been witnessed by the NRC

inspector, with the following verification package reinspection being

witnessed during this report period:

)

i

!

-

-

--]

,

_. ..

,

_

_ -

_

-

-

'

,

-32-

'

,

I-M-lGCO-113 (Unit 2):

During this reinspection, ERC identified one

coiidition as subject to evaluation as a potential deviation, f.e. ,

.

-

flanges tflat were identified as orifice flanges on the isometric

drawing did not have an identification tag or flow direction

indication.

Disposition of the above finding is an open item (446/8511-0-05).

No NRC violations or deviations were identified.

1.

_ Piping Syster Bolted Joints / Materials

ERC has completed 73 reinspections of piping system bolted

joints /naterials as of October 26, 1985.

However, on eight of these

reinspe.ctions the attribute dealing with flange rating could not be

inspected because the flange was painted.

The paint will be scraped

off the eight flanges, thus allowing this attribute to be

reinspected,

ERC has also completed document reviews on 14 of the 73 packages.

The 73 packages represent 100% of the combined random and engineering

samples.

Status of NRC Intpection Activity

(1) The following ERC reinspecticn was independently inspected by

the NRC inspector:

Verification Package No. Drawing No.

Flange lio. Unit No.

I-M-PB0H-34

BRP-SI-1-R8-048

1

1

With respect to the above inspection, the flRC inspector

concurred with the ERC inspector's finding that the flange type

was not hardstamped on'the flange as required by the inspect 1on

procedure, and that this condition is subject to evaluation as a

potential deviation.

Suosequently, the Inspection procedure was

s

revised to allow inspectors to visually identify the type of

flange ir

4

's tmt hardstamped with such information.

The

,

above pill be reinigt'"1 hv

+nr this particular attribute.

t

No W

.iolations or 9

were mont

m

O) The following conditi m wi

were idntiflini uy itC in

Septenc er as subject to eva:. af.lon as potential deviatiotu

s1

DRs o .tten for them: (a) I-M-P80M-46 - Flange W.

J (Pra m g

f

BRP W 1-$8-003) ha : a loose not, and (b) 1-WPB0.+

5lange

k

-

_--

%

_

-

._

,-

+

m

-

- -

-

_

.

-33-

,

No. 3 (Dra.ving BRP-CH-1-EC-0048) had two studs without the

required one thread past the outer face of the nut.

Existing open items for these subjects (i.e., 445/8513-0-21 and

445/8513-0-22) will remain open pending review of the

applicant's completed disposition.

No flRC violations or deviations were identified.

j.

Small Bore Piping and Instrumntation Tube Welds /K1terial

Status of CPRT Activity

Reinspection is in progress of small bore pipe and instrumentation

ub
welds and material present in a random sample of 60 weids from

Units 1 and 2.

Forty-four small bore pipe and instrumentation tubing

welds have been visusily reinspected.

Base riaterial heat codes and

welder identifications have been recorded and are undergoing

docurentation review. No deviations have been found.

Stat.us of NRC Inspection Activity

The following seven reinspections of snall-bore piping welds were

witnessed by the NRC inspector:

1erification Package No. Pipe No. & Weld No.

DRP No.

I-M-SBWM-016

CH-2-216-152-3, Wold 11

CH-2-SB-009

I-H-SBWM-003

SW 2-368-105-3, Weld 23A

SW-2-AB-027

I-H-58 4 013

CC-2-064-152-3, Weld 1-1

CC-2 SB-002

I-P-SBWM-040

C'i-1-220- 152-3 , Weld 37-2

CH-1-SB-024

I-H-5BWM-076

C5-1-905-250-R2, Weld 18

CS-1-RB-013

I-H-SBWM-054

CT-1-127-901-R2, Weld 56

CT-1-RB-031

1-H-SBWM-057

CT-1-127-301-R2 Weld 43

CT-1-RB-031

No conditions subject tu evaluation as potential deviations were

identified by ERC to the NRC inspector.

No NRC violations or deviations were identified.

k.

targe Bore Pipir.g Welds / Material

Status of CPRT Activity

l

l

Visual reinspection is in progress of a random sample of 60 ASME

l

Section !!I large bore pipin0 welds and material from Units 1 and 2.

To date, 35 1arge bore piping velds have been reinspected. One

deviation has been identified which is currently being evaluated for

validity and safety significance by ERC.

,

_

. -

. .

.

.

.

. .

.

.

.

.

. .

.

.

.

.

.

'.

-

.o.

'

-

r

,

,+

,

Ikl

1

-34-

.

'

Status of NRC Inspection Activity

'

,

-

As of October 25, 1985, the-following eight reinspections of sampled

'

large_ bore piping welds were? witnessed by the NRC inspector:

,.

Verification Package No. Pipe No. & Weld No.

BRP.'No.

,

~

I-M-LBWM-003

CS-2-250-301-R-3, Weld 6

CS-2-SB-020

I-M-LBWM-009

CS-2-309-301-R-3, Weld 8

CS-2-SB-030

I-M-LBWM-026

BR-X-056-151-R-3, Weld 7

BR-X-AB-048

,

I-M-LBWM-030

0D-1-18-151-3, Weld 16-1

00-1-AB-013

I-M-LBWM-084

FW-2-102-1303-2, Weld 1-3

FW-2-RB-022-

I-M-LBWM-078

CC-2-271-152-3, Weld 31

CC-2-RB-53

I-M-LBWM-001

CC-2-302-301-R3, Weld 7A'

CS-2-AB-032

I-M-LBWM-060

CS-2-026-301-R3, Weld 11

CS-2-AB-065

No conditions subject to evaluation as potential deviations were

identified by ERC to the NRC inspector.

No NRC violations or deviations were identified.

~

,

1.

Large Bore Pipe Supports - Rigid

Status of CPRT Activity

Reinspection / verification of pipe support installations by ERC is

approximately 94% complete.

A total of 151 deviations have been

identified of which 98 have been determined to be valid.

The

remainder are currently being reviewed for validity.

Status of NRC Inspection Activity

(1) The NRC inspector performed independent inspections on pipe

support Verification Package Nos. I-S-LBSR-013-and -023, in

order to assess the adequacy of the ERC reinspections.

The ERC

-reinspection of pipe support Verification Package No.

.

I-S-LBSR-013 was determined to be adequate, accurate, and

complete. However, during the independent inspection of

I-S-LBSR-023, one deviation from a commitment was identified

with respect to failure to identify discrepant dimensions.

Paragraph 5.3.4.c in QI-027 states with respect to dimensional

tolerances not shown on design drawings, " Component Member-

Length +/- 1/2 inch." The Bill of Material on Revisicn 2 of

'

,

drawing No. CT-1-097-402-C52R lists item No. 4 (2 pieces) as

, ~

being 7 3/4 inches long.

Independent NRC inspection determined

.

the actual length dimensions to be, respectively, 6'5/8 inches

and 6 1/2 inches, both of.which are under the minimum indicated

,e.

dimension of 7 1/4 inches (445/8514-0-04).

4

\\

>

4

4

_ . _ _ . _ _ . , - . _ _ _ _ _ _ _ - . . - - _ . _ _ _ _ _ _ _ _ _ _ . - - _


A

(,

.

,

-35-

,

(2) During inspection of the installation of box frame supports,

j

which are a part of the Unit 1 containment spray system, t' e NRC

'

inspector observed that clearances exist between the botton: of

the pipe and the pipe support, and in some cases no clearance

exists between the top of the pipe and pipe support.

The TUGC0

Engineering as-built piping verification supervisor was

contacted about the conflict between the as-built drawings for

these supports and the actual field configuration.

The TUGC0

Engineering supervisor stated that their as-built piping

,

configuration program, TNE-DC-24-1, satisfies the requirements

of NRC Bulletin 79-14 and that the as-built configuration

,

!.

complied with installation tolerances.

The conditions

identified above increase loading on adjacent pipe supports and

increase stresses on the piping system.

The conditions listed

,

'

above are being referred to NRR for consideration when

determining the accuracy and adequacy of Stone and Webster-

,

Engineering Corporation's stress analysis program for the

applicable design specific action plan.

m.

Large Bore Pipe Supports - Non-Rigid

,

!

Status of CPRT Activity

Reinspection / verification of pipe support installations by ERC is

approximately 88% complete.

A total of 217 deviations have been

identified of which, to.date, 162 have been determined to be valid.

Status of NRC Inspection Activity

(1) The NRC inspector witnessed ERC's reinspection of Verification

Package No. I-S-LBSN-249 to verify compliance with QI-029.

During the inspection, ERC identified the following conditions

to the NRC inspector as subject to evaluation as potential

deviations: (a) component member lengths out of tolerance, (b)

undersize welds, and (c) missing locking devices.

Dispositions of the above items are an open item

(445/8514-0-26).

No NRC violations or deviations were identified.

(2) The NRC. inspector performed independent inspections on pipe

support Verification Package Nos. I-S-LBSN-014, -025, -035, and

-052, in order to assess the adequacy of the ERC reinspections.

This effort revealed that ERC had performed their reinspections

in accordance with the requirements of QI-029.

No NRC violations or deviations were identified.

,

. . - .

.

.

- .

.

- -

- .

. -

-

. .

-

- . . .

.

g.

.

. .

.

.

1

F

a

-36-

,

,.

'

-

,

.

,

n.

- Small Bert Piping Configuration

,

.

Status of.CPRT Activity

'

[e

'

As aof October ;25,1985, reinspection was complete for 64 of 95 random

p'

'

sample small bore pipin'g configuration items.

The reinspections

identified conditions which resulted in the issuance of 45 DRs, 25 of

which were validated and are being evaluated by ERC for safety

significance.

'

i

I

The NRC inspector was informed by the population engineer that the

population items list'is currently being revised.to exclude all items

not having an "N-5" designation on the piping isometric drawings.

One exception will be certain safety related piping in Unit 1 that

has been exempted from "NA" code stamping requirements.

'

The NRC inspector was informed that the above described revision to

the population items list is required in order to ensure that all

~

,

CPRT reinspection items included those which had been previously

'

inspected and accepted by construction QC,

Approximately 20

previously reinspected items will be excluded from the reinspection

samples as a result of this revision.

Deviations have involved out of tolerance linear and location

measurements, incorrect valve flow direction orientation, inadequate

clearances with adjacent piping and equipment, and the part number on

a valve differing from that on the isometric drawing.

Status of NRC Inspection Activity

(1) ERC methods.and related documents used in establishing the

population items list were reviewed for population

inclusiveness.

Completed SSE reports are currently being

reviewed by the NRC inspector.

As of October 25, 1985, six

reinspections have been witnessed by the NRC inspector, of which

the following three were witnessed during~this report period:

'

Verification Package No.

Unit No.

I-M-SBC0-015

1

I-M-SBCO-061

1

1

I-M-SBCO-079

2

l

.

1

m

-

.a.

-m---.

-

- - -

-

a

.-


a-

- . - - -

- - - .

--*

Y

v -~

- - -

--

-

-

.

.o

~ . .

,

.

.

i

i.

-37-

(2) During the above reinspections, ERC identified the following

conditions to the NRC inspector as subject to evaluation as

potential deviations:

I-M-SBCO-061:

There was insufficient clearance with three

adjacent pipes and a linear dimension measurement was out of

tolerance.

I-M-SBCO-079:

Certain field survey elevation measurements were

not the same as the elevations shown on the isometric drawing.

Dispositions of the above findings are open items (445/8514-0-27

and 446/8511-0-06).

No NRC violations or deviations were' identified.

i

o.

HVAC Duct Supports

Status of CPRT Activity

Visual einspection of a random sample of 66 HVAC duct supports from

Units 1, 2, and common is in process.

Twenty-five HVAC duct supports

have been reinspected by ERC with 18 deviations identified, mostly in

the areas of weld size and configurations.

The deviations are

currently being evaluated for validity and safety significance by

ERC.

Status of NRC Inspection Activity

'

(1) As of October 30, 1985, the following three reinspections of

sampled HVAC duct supports were witnessed by the NRC:

'

f

Verification Package No.

Unit No.

Duct Support No.

'

t

p.

, I-S-HVDS-023

1

CB-830-1N-1R

I-S-HVDS-041

1

AB-842-1L-1F

I-S-HVDS-005

2

CB-790-2N-1BF

>

(2) During the above reinspections, ERC identified the following

conditions to the NRC inspector as subject to evaluation as

.

'

potential deviations:

I-S-HVDS-023:

Size of horizontal brace was not per the drawing

and several welds were undersize.

,

I-S-HV05-041:

Undersize fillet welds.

7

_

,

-

_

__

' o

s

-38-

I-S-HVDS-005:

Wrong weld location, undersize fillet welds, and

craters.

Dispositions of the above findings are open items

(445/8514-0-28,445/8514-0-29,446/8511-0-07).

No NEC violations or deviations were identified.

p.

Containment Liner and Tank Stainless Steel Liner

Status of CPRT Activity

Ninety-one verification packages have been issued and reinspections

are approximately 96% complete using QI-031, Revision 0.

Documentation review of these packages using QI-032, Revision 0, is

approximately 45% complete.

Eighty-three DRs relating to the

documentation review have been issued.

These deviations are

currently being reviewed for validity and safety significance by ERC.

Status of NRC Inspection Activity

Review of NRC Inspection Report 50-445/85/13, 50-446/85-09 showed

that the number of inspections witnessed was incorrectly reported as

four rather that the actual number of nine.

No additional NRC

inspection activity occurred during this report period.

q.

Structural Steel

Status of CPRT Activity

A random sample of 60 structural steel members was selected from a

total population of approximately 1600 individual members.

Verification' packages are currently being prepared by ERC for each

member in the sample.

QI-045, Revision 1, is being used for physical

'

reinspection.

Fifteen packages have been issued to ERC inspectors

and inspection is approximately 5% complete based on a minimum sample

of 60.

Several of the 15 issued packages require additional drawings

and clarification.

Ten deviations have been identified, involving

primarily incorrect member size, undersized and missing welds,

inadequate bolt hole coverage, and inadequate Hilti bolt edge

distance.

A second random sample of structural steel members related

to safe shutdown systems is scheduled to be selected and inspection

commenced by the end of November 1985.

,

Status of NRC Inspection Activity

'

(1) The NRC inspector has reviewed QI-045, Revision 1.

The

following three inspections have been witnessed representing 5%

of the first random sample:

.

k

.

.

.

.

.

.

.

.

.

.

--

.

-39-

.

Verification Package No.

Equipment No.

Unit No.

I-S-STEL-120

MRB-0565-DCA-MK-A

1

I-S-STEL-88

AFC0-MK-C182-7-RB

1

,

I-S-STEL-95

AFC0-MK-D180-1-RB

1

(2) During the above reinspections, ERC identified the following

conditions to the NRC inspector as subject to evaluation as

potential deviations:

I-S-STEL-120:

Three attributes were rejected; i.e.,

(a) connection location, (b) connection size, and (c) bolt hole

edge distance.

I-S-STEL-88:

Undersized welds and incorrect member size were

identified.

I-S-STEL-95:

Exposed bolt holes and inadequate bolt tightening

were identified.

Dispositions of the above findings are open items (445/8514-0-30

through 445/8514-0-32).

No NRC violations or deviations were identified,

r.

Concrete Placement

Status of CPRT Activity

Reinspection of the first random sample of 60 concrete placement

packages is approximately 92% complete.

Twenty eight deviations have

been identified relating primarily to unfilled holes, voids, and

debris in the concrete surface.

These deviations are currently being

reviewed for validity and safety significance by ERC. Documentation

review procedures have not yet been issued.

Status of NRC Inspection Activity

(1) The NRC inspectot has reviewed QI-043, Revision 0, and witnessed

9 reinspections representing 15% of the first random sample of

60 concrete placements.

The following three ERC reinspections

were witnessed by the NRC inspector during this report period:

-

- -

- - -

-

-

-

-

r.

.

-40-

Verification Package No. Concrete Placement No.

Unit No.

I-S-CONC-40

CPC-105-6831-014

1

I-S-CONC-51

CPC-105-5865-012

1

I-S-CONC-11

CPS-101-2808-001

1

(2) During the above reinspections, ERC identified the following

conditions as potential deviations to the NRC inspector and

subsequently issued DRs:

I-S-CONC-40:

The locations of concrete cast-in place inserts

(Richmond) were out of tolerance.

DR I-S-CONC-40-DR1 was issued

subsequent to the inspection.

I-S-CONC-51:

Voids were identified in the concrete surface.

DR I-S-CORC-51-DR1 was issued subsequent to the inspection.

Dispositions of the above findings are open items (445/8514-0-33

and 445/8514-0-34).

No NRC violations or deviations were identified.

s.

Small Bore Pipe Supports

Status of CPRT Activity

A population of 7947 small bore pipe supports has been identified

from which a total of 76 support verification packages were randomly

selected for reinspection.

The first 60 of the verification packages

make up the first random sample as defined by the CPRT Action Plan.

The second sample pertains to safe shutdown systems and consists of

44 from the first sample of 60 and an additional 16 packages.

The

QIs used for reinspection and documentation review were QI-019,

Revision 2, and QI-020, Revision 0, respectively.

Physical reinspections are approximately 95% complete.

A total of 65

deviations have been identified, relating primarily to Hilti bolt

embedment, hole spacing and edge distance in base plates, and pipe

clearances. Documentation review is approximately 82% complete with

51 deviations identified.

All deviations are currently being

reviewed for validity and safety significance by ERC.

Status of NRC Inspection Activity

The NRC inspector has reviewed QI-019, Revision 2, and QI-020,

Revision 0.

Six physical reinspections representing 10% of the first

-

- -

- -

,

'

.

'

-41-

random sample were witnessed by the NRC inspector during September 1985.

No reinspections were witnessed during this report period.

No NRC violations or deviations were identified.

'

t.

Reinspection of Pipe Whip Restraints

Status of CPRT Activity

,

ERC has completed 13 out of the planned 110 reinspections of pipe

whip restraints as of October 26, 1985.

Status of NRC Inspection Activity

(1) The following two ERC reinspections of pipe whip restraints were

witnessed by the NRC inspector:

Verification Package No. Support Identification

Unit

I-S-PWRE-052

CP2-CSSSMR-05

2

I-S-PWRE-518

M40-52-0584

2

(2) During the above reinspections, ERC identified the following

conditions to the NRC inspector as subject to evaluation as

i

potential deviations:

I-S-PWRE-052:

(a) The distance between two capture plates on a

moment restraint was 9 5/16 inches, which was less than the

,

!

allowed distance of 9 1/2 +/- 1/8 inch; and (b) distance from

!

the centerline of one capture plate to the centerline of a weld

was 3 3/8 inches, which was greater than the allowed distance of

3 1/8 +/- 1/8 inch.

1

i

I-S-PWRE-518:

The grout did not completely cover the shim plate

l

underneath the top baseplate.

,

I

Dispositions of the above findings are open items (446/8511-0-08

and 446/8511-0-09).

(3) ERC also noted the following deficiencies outside of the defined

inspection scope:

I-$-PWRE-052:

One of the Richmond inserts on concrete column

I

No. 15 overlapped a Hilti bolt embedment for a pipe support on

!

the adjacent face of the same column by approximately

l

2 3/4 inches.

The Hilti bolt centerline was about 5 inches

i

l

i

'

I

.

. .

-

- -

-

.

~

o

,

i

-42-

above the Richmond insert centerline.

The impact of this

condition was to be evaluated.

I-S-PWRE-518:

There was a crater chipped out of the grout.

I

Dispositions of the above findings are open items (446/8511-0-10

and 44G/8511-0-11).

No NRC violations or deviations were identified.

!

u.

Reinspection of Instrument Pipe / Tube Supports

Status of CPRT Activity

i

ERC has completed 42 out of the planned 102 rainspections of

instrument pipe / tube supports as of October 26, 1985.

Status of NRC Inspection Activity

(1) The following four ERC reinspections of instrument pipe / tube

(

supports were witnessed by the NRC inspector during this report

l

period:

Verification Package No. Instrument Tag No.

Unit No.

I-S-INSP-004

1-FT-156

1

I-S-INSP-017

1-FI-245-78

1

I-S-INSP-024

1-P15-3384

1

I-5-INSP-057

1-LT-459

1

(2) During the above reinspections, ERC identified the following

conditions to the NRC inspector as subject to evaluation as

potential deviations:

l

I-S-INSP-004: (a) Support Nos. 48, 4C, 40, 4E, and 4K had bolts

without the minimum 70% of specified torque; and (b) support

No. 41 did not have the serrated groove of the spring nut

aligned with the channel ridge.

I-S-INSP-017: (a) Support No. 170 had a bolt without the

required one thread past the face of the nut; (b) support Nos. 171,

17K, 17L, 17M, 17N, and 17Q had bolts without the minimum 70% of

specified torque; (c) support No. 17K did not have the serrated

groove of the spring nut aligned with the channel ridge; and

1

,

l

l

l

,

-43-

(d) support Nos. 17A, 17J, and 17K had different type instrument

tubing clamps than specified on the drawing.

l

I-S-INSP-024:

(a) Supp3rt No. 24H had an undersized weld; (b)

support No. 24H had no visible heat numbers on the baseplate;

(c) support No. 24H had a structural tubing length of

56 3/4 inches, which is 1/2 inch greater than the maximum

allowable length specified on the drawing; and (d) support No.

l

24H had a different type of instrument tubing clamp than

l

specified on the drawing,

i

I-S-INSP-057: (a) Support Nos. 57A and 57E did not have the

serrated grooves of the spring nut aligned with the channel

l

ridge; (b) support Nos. 57N and 57P had spring nuts used in lieu

l

of required hex nuts; and (c) support No. 57N had a bolt that

!

did not have minimum 70% of specified torque.

l

l

Dispositions of the above findings are open items

(445/8514-0-35 through 445/8514-0-38).

,

(3) The following two ERC reinspections were independently inspected

by the NRC inspector:

l

Verification Package No.

Instrument Tag No.

Unit No.

I-S-INSP-007

1-PT-405

1

I-S-INSP-028

1-PI-2467

1

l

While performing the above independent inspections, it was noted

that on support Nos. 0070 and 028A, the serrated grooves on the

t

I

spring nuts did not align with the channel clamping ridge.

This

i

is required by attribute 4.5 of QI-055, " Reinspection of

l

Instrument Pipe / Tube Supports." However, the ERC inspectors

!

signed off this attribute as being acceptable.

This is an NRC

deviation (445/8514-D-04).

8.

Unresolved Items

Unresolved items are matters for which more information is required in

order to ascertain whether they are acceptable items, violations, or

deviations.

Seven unresolved items disclosed during the inspection are

j

discussed in paragraphs 6.g

6.h, 6.j, 7.a. 7.c, and 7 e.

9.

Exit Interview

An exit interview was conducted on November 1, 1985, with the applicant

representativos denoted in paragraph 1 of this appendix. During this

,

interview, the NRC inspectors summarized the scope and findings of the

'

inspection.

The appilcant acknowledged the findings,

i

l

- .-

.

-

-

-

-

.

-

-

-

-

-

-

-

.

.

-

-

-

- -

-

.

-

- - -