In Reply Refer To:
MAR 06 M
Dockets:
50-445/85-14
50-446/85-11
Texas Utilities Generating Company
ATTN: Mr. W. G. Counsil
Executive Vice President
400 North Olive, L.B. 81
Dallas, Texas 75201
Gentlemen:
This refers to the inspection conducted by Mr. T. F. Westerman and other
!
members of the Region IV Comanche Peak Group during the period September 30
through October 31, 1985, of activities covered by NRC Construction Permits
CPPR-126 and CPPR-127 for the Comanche Peak Steam Electric Station, Units 1
and 2, and to the respective discussions of our findings with
l
Messrs. J. B. George and J. C. Kuykendall, and other members of your staff at
l
the conclusion of the inspection.
Areas examined during the inspection included operations, constidction, and
!
Comanche Peak Response Team activities.
An inspection was also performed by
Region IV staff of Unit 2 cable tray support modifications during this report
l
i
period. Within these areas, the inspection consisted of selective examination
l
of procedures and reoretentative records, interviews with personnel, and
observations by the inspectors. These findings are documented in the enclosed
'
i
inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to:
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10 Code of
Federal Regulations.
Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
During this inspection, it was found that certain of your activities appeared
to deviate from commitments made to the NRC. These items and references to the
commitments are identified in the enclosed Notice of Deviation. You are
requested to respond to these deviations in writing.
Your response shJuld be
based on the specifics contained in the Notice of Deviation enclosed with this
letter.
With respect to item A in the Notice of Deviation, the NRC has ascertained
+
subsequent to this report period that ERC logs for tracking of
equipment / service requests have not been utilizing procedurally required unique
numbers for individual requests. Accordinly, please address this as part of
your response to item A in the Notice of Deviation.
RIV: CPG / SRI / CON
SRI /0PS M
CPG
CPG
DRSP F NRR
SHPhillipsq
DLKelley
IBarnes
TFWesterman
EHJohnson VSNoonan
3/3/86
3 / S /86
3 / 3/86
4j 3 /86
3 /g/86
L/ /p6g,
.A N
'
'
7~60/
B603180486 B60306
?" }" " " W
ij
$
-
- e
,
Texas Utilities Generating Company
-2-
Twenty unresolved items are identified as follows in the enclosed inspection
report: Appendix C, paragraph 4; Appendix D, paragraphs 3.a. 3.c, 4.g, 5, 5.a.
5.c, 5.d, and 6; Appendix E, paragraphs 6.g, 6.h, 6.j, 7.a, 7.c, and 7.e.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of Appendix L, paragraph 4 of Appendix 0, and paragraph 2 of
Appendix E of the enc,losed report.
The responses directed by this letter and the accompanying Notices are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original signed By
E. H. Johnson
E. H. Johnson, Director
Division of Reactor Safety and
Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - Notice of Deviation
3.
Appendix C - NRC Operations Inspection Report
50-445/85-14
4.
Appendix D - NRC Construction Inspection Report
50-445/85-14
50-446/85-11
5.
Appendix E - NRC Comanche Peak Response Team Activities Inspection Report
50-445/85-14
50-446/85-11
6.
Appendix F - NRC Cable Tray Modifications Inspections Report
50-446/85-11
cc w/ enclosures:
(See page 3)
e,
u.
-
-
.-
.
- - -
.
- -
-
.
.
. . . - - .
- .
- . .
- - -
. - . .
-
.
.
- -
.
. -
- -
-
- . . .
'
.
Texas Utilities Generating Company
-3-
cc w/ enclosures:
Texas Utilities Generating Company
ATTN:
J. W. Beck, Vice President
Licensing, Quality Assurance,
and Nuclear Fuels
Skyway Tower
400 North Olive Street
Lock Box 81
Dallas, Texas
75201
Juanita Ellis
President - CASE
1426 Polk Street
Dallas, Texas 75224
Renea Hicks
Assistant Attorney General
i
Environmental Protection Division
'
P. O. Box 12548
TEXAS STATE DEPARTMENT OF HEALTH
bectoDMB(IE01)
bec distrib. by RIV:
- RPB
- MIS System
- RRI-0PS
- RSTS Operator
- RR!-CONST
- R&SPB
- T. F. Westerman, CPTG
DRSP
V. Noonan, NRR
R. Martin, RA
S. Treby, ELD
- RSB
- RIV File
J. Taylor, IE
- D. Weiss,LFMB(AR-2015)
R. Heishman, IE
- w/766
-
-