ML20149M971: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:c ;
{{#Wiki_filter:c ;
  A
A
      -
        i . 'i .-
    r  -. g i
            i-
-
-
                                                                    FEB 2 21983
i . 'i .-
                      Docket No. 50-271                                                     License No. DPR-28
-. g i
                      Vermont Yankee Nuclear Power Corporation
r
                      ATTN:   Mr. Warren P. Murphy
i-
                              Vice President & Manager of Operations
-
                      RD 5, Box 169
FEB 2 21983
                      Ferry Road
Docket No. 50-271
                      Brattleboro, Vermont 05301
License No. DPR-28
                      Gentlemen:
Vermont Yankee Nuclear Power Corporation
                      Subject:   Inspection No. 50-271/87-19
ATTN:
                      Enclosed is the report of the team inspection conducted by Mr. L. S. Cheung
Mr. Warren P. Murphy
                      and other NRC-inspectors and iepresentatives on October 19-23, 1987 et the
Vice President & Manager of Operations
                      Yankee Atomic Electric Company office, Framingham, Massachusetts, and the
RD 5, Box 169
                      Vermont Yankee Corporate office located at Brattleboro, Vermont.
Ferry Road
                      The team's findings were discussed with you at the conclusion of the inspec-
Brattleboro, Vermont 05301
                      tion. The inspection reviewed your program for establishing and maintaining
Gentlemen:
                      the qualification of electric equipment within the scope of 10 CFR 50.49.
Subject:
                      Within these areas the inspection consisted of reviews of selected procedures
Inspection No. 50-271/87-19
                      and environmental qualification packages, interviews with personnel, observa-
Enclosed is the report of the team inspection conducted by Mr. L. S. Cheung
                      tions and a physical walkdown verification of specific electrical equipment.
and other NRC-inspectors and iepresentatives on October 19-23, 1987 et the
                      Based on the results of. this inspection, it appears that one of your activities
Yankee Atomic Electric Company office, Framingham, Massachusetts, and the
                      was not conducted in full compliance with NRC requirements, as set forth in the
Vermont Yankee Corporate office located at Brattleboro, Vermont.
                    ' Notice of Violation, enclosed herewith as Appendix A. This violation has been
The team's findings were discussed with you at the conclusion of the inspec-
                      categorized by severity level in accordance with the "General Statement of
tion. The inspection reviewed your program for establishing and maintaining
                      Policy and Procedure for NRC Enforcement Actions, 10 CFR Part 2, Appendix C
the qualification of electric equipment within the scope of 10 CFR 50.49.
                      (Enforcement Policy 1987)." You are required to respond to this letter and in
Within these areas the inspection consisted of reviews of selected procedures
,                    preparing your response, you should follow the instructions in Appendix A.
and environmental qualification packages, interviews with personnel, observa-
                      Your cooperation with us in this matter is appreciated.
tions and a physical walkdown verification of specific electrical equipment.
                                                                Sincerely,
Based on the results of. this inspection, it appears that one of your activities
                  8802290332 880222
was not conducted in full compliance with NRC requirements, as set forth in the
                  PDR     ADOCK 05000271                             0 ** ! * " " ' *"* ? ! !. t
' Notice of Violation, enclosed herewith as Appendix A.
                  O                   PDR-                         7-       :.: .
This violation has been
                                                                William V. Johnston, Acting Director
categorized by severity level in accordance with the "General Statement of
                                                                Division of Reactor Safety
Policy and Procedure for NRC Enforcement Actions, 10 CFR Part 2, Appendix C
                      Enclosure: NRC Region 1 Inspe tion Report Number 50-271/87-19
(Enforcement Policy 1987)." You are required to respond to this letter and in
                                                                                                  fl@
preparing your response, you should follow the instructions in Appendix A.
                                                  OFFICIAL RECORD COPY         IR VY 87-19 - 0001.0.0
,
                                                                              02/16/88
Your cooperation with us in this matter is appreciated.
Sincerely,
8802290332 880222
PDR
ADOCK 05000271
0 ** ! * " " ' *"* ? ! !. t
O
PDR-
7-
:.: .
William V. Johnston, Acting Director
Division of Reactor Safety
Enclosure: NRC Region 1 Inspe tion Report Number 50-271/87-19
fl@
OFFICIAL RECORD COPY
IR VY 87-19 - 0001.0.0
02/16/88
i.
i.


  ,-                                                                                       .
,-
      -                                                                               :'
.
        .
-
        -
:'
          Vermont Yankee Nuclear                       2
.
              Power Corporation
Vermont Yankee Nuclear
          cc w/ enc 1':
2
          J. Gary Weigand, President and Chief Executive Officer
-
          J. P. Pelletier, Plant Manager
Power Corporation
          John DeVincentis, Vice President,. Yankee Atomic                                 f
cc w/ enc 1':
          R. W. Capstick, Licensing Engineer
J. Gary Weigand, President and Chief Executive Officer
          Cort Richardson, Vermont Public Interest Research Group, Inc.                   .,
J. P. Pelletier, Plant Manager
          Gerald Tarrant, Commissioner, Vermont Department of Public Service                 '
John DeVincentis, Vice President,. Yankee Atomic
          Peter W. - Agnes, Assistant Secretary of Public Safety,                    .
f
                Commonwealth of Massachusetts
R. W. Capstick, Licensing Engineer
          U. Patapovs, NRR/RVIB
Cort Richardson, Vermont Public Interest Research Group, Inc.
          0. J. Holody
.,
          Public Document Room (PDR)
Gerald Tarrant, Commissioner, Vermont Department of Public Service
          local Public Document Room (LPDR)
          Nuclear Safety Information Center (NSIC)
          NRC Resident Inspector
          State of New Hampshire
          State of Vermont
          Commonwealth of Massachusetts
          bec w/ enc 1:
          Region I Docket Room (with concurrences)
          Management Assistant, DRMA (w/o enc 1)
          Section Chief, DRP
          H. Eichenholz, SRI, Yankee
          V. Rooney, PM, NRR
          Robert J. Bores, DRSS
          X. Abraham,~ PA0 (9) (SALP Reports Only)
              GfC
          RI:DRS            RI:DRS
                                                    h
                                                RI:DRS
          Cheung/sh/rw      Anderson            Durr
'
'
          1/ d /88         .9//6/88           f 1//&/88
Peter W. - Agnes, Assistant Secretary of Public Safety,
                                      0FFICIAL RECORD COPY     IR VY 87-19 - 0002.0.0
.
;                                                             02/01/88
Commonwealth of Massachusetts
    .                   __       _.
U. Patapovs, NRR/RVIB
                                      ._ - - -                       -
0. J. Holody
                                                                          - .
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Hampshire
State of Vermont
Commonwealth of Massachusetts
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
Section Chief, DRP
H. Eichenholz, SRI, Yankee
V. Rooney, PM, NRR
Robert J. Bores, DRSS
X. Abraham,~ PA0 (9) (SALP Reports Only)
GfC
h
RI:DRS
RI:DRS
RI:DRS
Cheung/sh/rw
Anderson
Durr
1/ d 88
.9//6/88
1
f //&/88
/
'
0FFICIAL RECORD COPY
IR VY 87-19 - 0002.0.0
;
02/01/88
.
__
_.
._ - - -
-
- .
}}
}}

Latest revision as of 08:29, 11 December 2024

Forwards Insp Rept 50-271/87-19 on 871019-23 & Notice of Violation
ML20149M971
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 02/22/1988
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20149M972 List:
References
NUDOCS 8802290332
Download: ML20149M971 (2)


See also: IR 05000271/1987019

Text

c ;

A

-

i . 'i .-

-. g i

r

i-

-

FEB 2 21983

Docket No. 50-271

License No. DPR-28

Vermont Yankee Nuclear Power Corporation

ATTN:

Mr. Warren P. Murphy

Vice President & Manager of Operations

RD 5, Box 169

Ferry Road

Brattleboro, Vermont 05301

Gentlemen:

Subject:

Inspection No. 50-271/87-19

Enclosed is the report of the team inspection conducted by Mr. L. S. Cheung

and other NRC-inspectors and iepresentatives on October 19-23, 1987 et the

Yankee Atomic Electric Company office, Framingham, Massachusetts, and the

Vermont Yankee Corporate office located at Brattleboro, Vermont.

The team's findings were discussed with you at the conclusion of the inspec-

tion. The inspection reviewed your program for establishing and maintaining

the qualification of electric equipment within the scope of 10 CFR 50.49.

Within these areas the inspection consisted of reviews of selected procedures

and environmental qualification packages, interviews with personnel, observa-

tions and a physical walkdown verification of specific electrical equipment.

Based on the results of. this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

' Notice of Violation, enclosed herewith as Appendix A.

This violation has been

categorized by severity level in accordance with the "General Statement of

Policy and Procedure for NRC Enforcement Actions, 10 CFR Part 2, Appendix C

(Enforcement Policy 1987)." You are required to respond to this letter and in

preparing your response, you should follow the instructions in Appendix A.

,

Your cooperation with us in this matter is appreciated.

Sincerely,

8802290332 880222

PDR

ADOCK 05000271

0 ** ! * " " ' *"* ? ! !. t

O

PDR-

7-

.: .

William V. Johnston, Acting Director

Division of Reactor Safety

Enclosure: NRC Region 1 Inspe tion Report Number 50-271/87-19

fl@

OFFICIAL RECORD COPY

IR VY 87-19 - 0001.0.0

02/16/88

i.

,-

.

-

'

.

Vermont Yankee Nuclear

2

-

Power Corporation

cc w/ enc 1':

J. Gary Weigand, President and Chief Executive Officer

J. P. Pelletier, Plant Manager

John DeVincentis, Vice President,. Yankee Atomic

f

R. W. Capstick, Licensing Engineer

Cort Richardson, Vermont Public Interest Research Group, Inc.

.,

Gerald Tarrant, Commissioner, Vermont Department of Public Service

'

Peter W. - Agnes, Assistant Secretary of Public Safety,

.

Commonwealth of Massachusetts

U. Patapovs, NRR/RVIB

0. J. Holody

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Hampshire

State of Vermont

Commonwealth of Massachusetts

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

Section Chief, DRP

H. Eichenholz, SRI, Yankee

V. Rooney, PM, NRR

Robert J. Bores, DRSS

X. Abraham,~ PA0 (9) (SALP Reports Only)

GfC

h

RI:DRS

RI:DRS

RI:DRS

Cheung/sh/rw

Anderson

Durr

1/ d 88

.9//6/88

1

f //&/88

/

'

0FFICIAL RECORD COPY

IR VY 87-19 - 0002.0.0

02/01/88

.

__

_.

._ - - -

-

- .