Text
c ;
A
-
i . 'i .-
-. g i
r
i-
-
FEB 2 21983
Docket No. 50-271
License No. DPR-28
Vermont Yankee Nuclear Power Corporation
ATTN:
Mr. Warren P. Murphy
Vice President & Manager of Operations
RD 5, Box 169
Ferry Road
Brattleboro, Vermont 05301
Gentlemen:
Subject:
Inspection No. 50-271/87-19
Enclosed is the report of the team inspection conducted by Mr. L. S. Cheung
and other NRC-inspectors and iepresentatives on October 19-23, 1987 et the
Yankee Atomic Electric Company office, Framingham, Massachusetts, and the
Vermont Yankee Corporate office located at Brattleboro, Vermont.
The team's findings were discussed with you at the conclusion of the inspec-
tion. The inspection reviewed your program for establishing and maintaining
the qualification of electric equipment within the scope of 10 CFR 50.49.
Within these areas the inspection consisted of reviews of selected procedures
and environmental qualification packages, interviews with personnel, observa-
tions and a physical walkdown verification of specific electrical equipment.
Based on the results of. this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
' Notice of Violation, enclosed herewith as Appendix A.
This violation has been
categorized by severity level in accordance with the "General Statement of
Policy and Procedure for NRC Enforcement Actions, 10 CFR Part 2, Appendix C
(Enforcement Policy 1987)." You are required to respond to this letter and in
preparing your response, you should follow the instructions in Appendix A.
,
Your cooperation with us in this matter is appreciated.
Sincerely,
8802290332 880222
ADOCK 05000271
0 ** ! * " " ' *"* ? ! !. t
O
PDR-
7-
- .: .
William V. Johnston, Acting Director
Division of Reactor Safety
Enclosure: NRC Region 1 Inspe tion Report Number 50-271/87-19
fl@
OFFICIAL RECORD COPY
IR VY 87-19 - 0001.0.0
02/16/88
i.
,-
.
-
- '
.
Vermont Yankee Nuclear
2
-
Power Corporation
cc w/ enc 1':
J. Gary Weigand, President and Chief Executive Officer
J. P. Pelletier, Plant Manager
John DeVincentis, Vice President,. Yankee Atomic
f
R. W. Capstick, Licensing Engineer
Cort Richardson, Vermont Public Interest Research Group, Inc.
.,
Gerald Tarrant, Commissioner, Vermont Department of Public Service
'
Peter W. - Agnes, Assistant Secretary of Public Safety,
.
Commonwealth of Massachusetts
U. Patapovs, NRR/RVIB
0. J. Holody
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Hampshire
State of Vermont
Commonwealth of Massachusetts
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
Section Chief, DRP
H. Eichenholz, SRI, Yankee
Robert J. Bores, DRSS
X. Abraham,~ PA0 (9) (SALP Reports Only)
GfC
h
RI:DRS
RI:DRS
RI:DRS
Cheung/sh/rw
Anderson
Durr
1/ d 88
.9//6/88
1
f //&/88
/
'
0FFICIAL RECORD COPY
IR VY 87-19 - 0002.0.0
02/01/88
.
__
_.
._ - - -
-
- .