--- 7 LOUIS 1ANA P O W E R & L I G H T ! WATEAFORD 3 SES e PO. 00X B e KLLONA, LA 70066-0751 mass May 4, 1988 W3A88-0043 A4.05 QA U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C. | |||
20555 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Reporting of Special Report Attached is Special Eeport Number SR-88-004-00 for Waterford Steam Electric Statior. Unit 3. | Waterford 3 SES Docket No. 50-382 License No. NPF-38 Reporting of Special Report Attached is Special Eeport Number SR-88-004-00 for Waterford Steam Electric Statior. Unit 3. | ||
i | This Special Report is submitted per 10CFR50.36(c)(2) and Technical Specifications 4.4.4.5 and 6.9.2. | ||
Very truly yours, | i Very truly yours, | ||
)Cw N.S. Carns Plant Manager - Nuclear NSC/WEM:rk Attachment ec R.D. Martin, NRC Resident Inspectors Office, INPO Records Center (J.T. Wheelock), E.L. Blake, W.M. | |||
Stevenson, D.L. Wigginton P | |||
8805100281 880504 PDR ADOCK 05000392 S | |||
DCD s \\ | |||
"AN EQUAL OPPORTUNITY EMPLOYER" | |||
e | e t | ||
This renort is submitted in accordance with Technical Specification (TS) l | SPECIAL REPORT SR-88-004-00 Steam Generator Eddy Current Examination (2nd Refueling) l Inservice eddy current examination of the Steam Generator (S/G) tubing was completed at the Waterford Steam Electric Station Unit 3 on April 20, 1988. | ||
This renort is submitted in accordance with Technical Specification (TS) l 4.4.4.5.a which requires reporting of the number of tubes plugged in each S/G l | |||
within 15 days following the completion of inservice inspection of S/G tubes | within 15 days following the completion of inservice inspection of S/G tubes | ||
( | ( | ||
The total number of tubes which have been plugged in each steam generator are shown below: | pursuant to TS 6.9.2. | ||
S/G #1 | A followup report will be submitted in accordance with TS 4.4.4.5.b by April 20, 1989. | ||
Batwing (Preventive Plugging) | The total number of tubes which have been plugged in each steam generator are shown below: | ||
First Refueling | S/G #1 S/G #2 Manufacturing /Preservice 6 | ||
Second Refueling | 20 l | ||
Batwing (Preventive Plugging) 149 149 l | |||
First Refueling 0 | |||
1 Second Refueling 3 | |||
2 l | |||
TOTAL 158 172 l | |||
l l | l l | ||
PLANT CONTACT L.L. Bass, Technical Support Supervisor, 504/467-279), Extension 327. | PLANT CONTACT L.L. Bass, Technical Support Supervisor, 504/467-279), Extension 327. | ||
1}} | 1 | ||
-}} | |||
Latest revision as of 02:36, 11 December 2024
| ML20153F254 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 05/04/1988 |
| From: | Carns N LOUISIANA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| SR-88-004-00, SR-88-4, W3A88-0043, W3A88-43, NUDOCS 8805100281 | |
| Download: ML20153F254 (2) | |
Text
e a
Raf:
--- 7 LOUIS 1ANA P O W E R & L I G H T ! WATEAFORD 3 SES e PO. 00X B e KLLONA, LA 70066-0751 mass May 4, 1988 W3A88-0043 A4.05 QA U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C.
20555
SUBJECT:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Reporting of Special Report Attached is Special Eeport Number SR-88-004-00 for Waterford Steam Electric Statior. Unit 3.
This Special Report is submitted per 10CFR50.36(c)(2) and Technical Specifications 4.4.4.5 and 6.9.2.
i Very truly yours,
)Cw N.S. Carns Plant Manager - Nuclear NSC/WEM:rk Attachment ec R.D. Martin, NRC Resident Inspectors Office, INPO Records Center (J.T. Wheelock), E.L. Blake, W.M.
Stevenson, D.L. Wigginton P
8805100281 880504 PDR ADOCK 05000392 S
DCD s \\
"AN EQUAL OPPORTUNITY EMPLOYER"
e t
SPECIAL REPORT SR-88-004-00 Steam Generator Eddy Current Examination (2nd Refueling) l Inservice eddy current examination of the Steam Generator (S/G) tubing was completed at the Waterford Steam Electric Station Unit 3 on April 20, 1988.
This renort is submitted in accordance with Technical Specification (TS) l 4.4.4.5.a which requires reporting of the number of tubes plugged in each S/G l
within 15 days following the completion of inservice inspection of S/G tubes
(
pursuant to TS 6.9.2.
A followup report will be submitted in accordance with TS 4.4.4.5.b by April 20, 1989.
The total number of tubes which have been plugged in each steam generator are shown below:
S/G #1 S/G #2 Manufacturing /Preservice 6
20 l
Batwing (Preventive Plugging) 149 149 l
First Refueling 0
1 Second Refueling 3
2 l
TOTAL 158 172 l
l l
PLANT CONTACT L.L. Bass, Technical Support Supervisor, 504/467-279), Extension 327.