ML20153F254: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:e   a Raf: 10CFR50.36(c)(2)
{{#Wiki_filter:e a
      --- 7 LOUIS 1ANA P O W E R & L I G H T ! WATEAFORD 3 SES e PO. 00X B e KLLONA, LA 70066-0751 mass May 4, 1988 W3A88-0043 A4.05 QA U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C. 20555
Raf:
10CFR50.36(c)(2)
--- 7 LOUIS 1ANA P O W E R & L I G H T ! WATEAFORD 3 SES e PO. 00X B e KLLONA, LA 70066-0751 mass May 4, 1988 W3A88-0043 A4.05 QA U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C.
20555


==SUBJECT:==
==SUBJECT:==
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Reporting of Special Report Attached is Special Eeport Number SR-88-004-00 for Waterford Steam Electric Statior. Unit 3.       This Special Report is submitted per 10CFR50.36(c)(2) and Technical Specifications 4.4.4.5 and 6.9.2.
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Reporting of Special Report Attached is Special Eeport Number SR-88-004-00 for Waterford Steam Electric Statior. Unit 3.
i l
This Special Report is submitted per 10CFR50.36(c)(2) and Technical Specifications 4.4.4.5 and 6.9.2.
Very truly yours,
i Very truly yours,
                                                        )Cw N.S. Carns Plant Manager - Nuclear NSC/WEM:rk Attachment ec   R.D. Martin, NRC Resident Inspectors Office, INPO Records Center                         1 (J.T. Wheelock), E.L. Blake, W.M. Stevenson, D.L. Wigginton                               l l
)Cw N.S. Carns Plant Manager - Nuclear NSC/WEM:rk Attachment ec R.D. Martin, NRC Resident Inspectors Office, INPO Records Center (J.T. Wheelock), E.L. Blake, W.M.
l l
Stevenson, D.L. Wigginton P
P 8805100281 880504 PDR     ADOCK 05000392 S                     DCD s\
8805100281 880504 PDR ADOCK 05000392 S
                              "AN EQUAL OPPORTUNITY EMPLOYER"
DCD s \\
"AN EQUAL OPPORTUNITY EMPLOYER"


e   t SPECIAL REPORT SR-88-004-00 Steam Generator Eddy Current Examination (2nd Refueling) l Inservice eddy current examination of the Steam Generator (S/G) tubing was completed at the Waterford Steam Electric Station Unit 3 on April 20, 1988.
e t
This renort is submitted in accordance with Technical Specification (TS) l         4.4.4.5.a which requires reporting of the number of tubes plugged in each S/G l
SPECIAL REPORT SR-88-004-00 Steam Generator Eddy Current Examination (2nd Refueling) l Inservice eddy current examination of the Steam Generator (S/G) tubing was completed at the Waterford Steam Electric Station Unit 3 on April 20, 1988.
This renort is submitted in accordance with Technical Specification (TS) l 4.4.4.5.a which requires reporting of the number of tubes plugged in each S/G l
within 15 days following the completion of inservice inspection of S/G tubes
within 15 days following the completion of inservice inspection of S/G tubes
(         pursuant to TS 6.9.2. A followup report will be submitted in accordance with TS 4.4.4.5.b by April 20, 1989.
(
The total number of tubes which have been plugged in each steam generator are shown below:                                                                   ;
pursuant to TS 6.9.2.
S/G #1       S/G #2 Manufacturing /Preservice                       6           20 l
A followup report will be submitted in accordance with TS 4.4.4.5.b by April 20, 1989.
Batwing (Preventive Plugging)                 149           149 l
The total number of tubes which have been plugged in each steam generator are shown below:
First Refueling                                 0             1               ,
S/G #1 S/G #2 Manufacturing /Preservice 6
Second Refueling                                 3             2 l                                       TOTAL           158           172 l
20 l
Batwing (Preventive Plugging) 149 149 l
First Refueling 0
1 Second Refueling 3
2 l
TOTAL 158 172 l
l l
l l
PLANT CONTACT L.L. Bass, Technical Support Supervisor, 504/467-279), Extension 327.
PLANT CONTACT L.L. Bass, Technical Support Supervisor, 504/467-279), Extension 327.
1}}
1
-}}

Latest revision as of 02:36, 11 December 2024

Special Rept SR-88-004-00:on 880420,inservice Eddy Current Exam of Steam Generator Tubing Completed.Rept Submitted in Accordance W/Tech Specs 4.4.4.5.a.Number of Tubes Plugged in Each Steam Generator Listed
ML20153F254
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/04/1988
From: Carns N
LOUISIANA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
SR-88-004-00, SR-88-4, W3A88-0043, W3A88-43, NUDOCS 8805100281
Download: ML20153F254 (2)


Text

e a

Raf:

10CFR50.36(c)(2)

--- 7 LOUIS 1ANA P O W E R & L I G H T ! WATEAFORD 3 SES e PO. 00X B e KLLONA, LA 70066-0751 mass May 4, 1988 W3A88-0043 A4.05 QA U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C.

20555

SUBJECT:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Reporting of Special Report Attached is Special Eeport Number SR-88-004-00 for Waterford Steam Electric Statior. Unit 3.

This Special Report is submitted per 10CFR50.36(c)(2) and Technical Specifications 4.4.4.5 and 6.9.2.

i Very truly yours,

)Cw N.S. Carns Plant Manager - Nuclear NSC/WEM:rk Attachment ec R.D. Martin, NRC Resident Inspectors Office, INPO Records Center (J.T. Wheelock), E.L. Blake, W.M.

Stevenson, D.L. Wigginton P

8805100281 880504 PDR ADOCK 05000392 S

DCD s \\

"AN EQUAL OPPORTUNITY EMPLOYER"

e t

SPECIAL REPORT SR-88-004-00 Steam Generator Eddy Current Examination (2nd Refueling) l Inservice eddy current examination of the Steam Generator (S/G) tubing was completed at the Waterford Steam Electric Station Unit 3 on April 20, 1988.

This renort is submitted in accordance with Technical Specification (TS) l 4.4.4.5.a which requires reporting of the number of tubes plugged in each S/G l

within 15 days following the completion of inservice inspection of S/G tubes

(

pursuant to TS 6.9.2.

A followup report will be submitted in accordance with TS 4.4.4.5.b by April 20, 1989.

The total number of tubes which have been plugged in each steam generator are shown below:

S/G #1 S/G #2 Manufacturing /Preservice 6

20 l

Batwing (Preventive Plugging) 149 149 l

First Refueling 0

1 Second Refueling 3

2 l

TOTAL 158 172 l

l l

PLANT CONTACT L.L. Bass, Technical Support Supervisor, 504/467-279), Extension 327.

1

-