f I | f I to GNR0-92/001Li DOCKET NO. | ||
50-416 DATE 09/04/92 COMPLETED BY L. F. Daughtery TELEPHONE (601)437-2334-OPERATING STATUS 1. | |||
Unit Name: GGNS UNIT 1 Notes: | |||
[ | |||
2. | |||
Reporting Period: A_ugust 1992 3. | |||
Licensed Thermal Power (MWT): 3833 MWT 4. | |||
NameplateRating(GrossMWE): 1372.5 MWT 5, | |||
Design Electrical Rating (Net MWe): 1250 MWE l | |||
6. | |||
Maximum Dependable Capacity (Gross MWe): 1190 MWF; 7. | |||
Maximum Dependable Capacity (Net MWe): 1143 MWE 8. | |||
If Changes Occur in Capacity Ratings (Items Numlier TThrough 7) Since Last Report. | |||
Give Reasons: | Give Reasons: | ||
N/A 9. | |||
Power Level To Which Restricted, In Any (Wet MWe): | |||
N/A | N/A | ||
: 10. Reasons For Restrictions, If Any: | |||
: 10. Reasons For Restrictions, If Any: | N/A This Month Yr to Date Cumulative | ||
This Month | : 11. Hours In Reporting Pericd 744 S,855 68,967 | ||
: 11. Hours In Reporting Pericd | : 12. Number of Hours Reactor Was Critical 702.0' 4,420.0 54,617.1 | ||
: 12. Number of Hours Reactor Was Critical | : 13. Reactor Reserve Shutdown Hours 0 | ||
: 13. Reactor Reserve Shutdown Hours | 0 0 | ||
: 14. Hours Generator On-Line | : 14. Hours Generator On-Line 679.6-4,234.3 52,284,.7 | ||
: 15. Unit Reserve Shutdown 1:aurs | : 15. Unit Reserve Shutdown 1:aurs 0~ | ||
: 16. Gross Thermal Energy Generated (MWH) | 0 0 | ||
: 17. 'iross Elect.'ical Energy Generated (MWH) | : 16. Gross Thermal Energy Generated (MWH) 2,466T47i 15,380,325 181 TOT,3I5 | ||
: 18. Net Electrical Energy Generated (MWH) | : 17. 'iross Elect.'ical Energy Generated (MWH) 780,844 4,901,436 57,471,546 | ||
: 19. Unit Service Factor | _ 700,748 14,961,463 | ||
91.3 | : 18. Net Electrical Energy Generated (MWH) 748,890 4, | ||
: 20. Unit Availability Factor | : 19. Unit Service Factor 91.3 72.3 78.3 | ||
: 21. Unit Capacity Factor (Using MDC Net) | ~ | ||
70.2 | : 20. Unit Availability Factor 91.1 72.3 78.3 | ||
: 22. Unit Capacity Factor (Using DER Net) | : 21. Unit Capacity Factor (Using MDC Net) 88.1 70.2 74 6 | ||
: 23. Unit Forced Outage Rate | : 22. Unit Capacity Factor (Using DER Net) 80.5 64.2 67.6 | ||
: 23. Unit Forced Outage Rate 8.7 7.8 6.6 | |||
: 24. Shutdowns Seneduled Over Next 6 Months (Type, Date, and Duration of Each): | : 24. Shutdowns Seneduled Over Next 6 Months (Type, Date, and Duration of Each): | ||
s | s | ||
: 25. If Shut Down At End of Report Period. | : 25. If Shut Down At End of Report Period. | ||
Estimated pate of Startup: | |||
: 26. Units In Test Status (Prior to Commercial Operation). | : 26. Units In Test Status (Prior to Commercial Operation). | ||
Forecast | Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 | ||
10/20/84 COMMERCIAL OPERATION | ~ | ||
COMMERCIAL OPERATION 07/01/86 9209210013 920914 PDR ADOCK 05 COO 416 R | |||
PDR | |||
i 4 | i 4 to GNRO-92/00115 l | ||
r i | |||
e DOCKET NO. | |||
e | 50-416 1 | ||
UNIT 1 | |||
i i | |||
DATE 09/04/92 i | |||
COMPLETED BY L. F. Daughtery TELEPHONE 501-437-2334 i | |||
MONTH August 1992 | |||
~; | |||
0 "' | |||
AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i | |||
(MWe-Net) | |||
(MWe-Net) 1 1140 17 - | |||
1186 i | |||
2 1170 18 1182 l | |||
3 1169 19 1180 l | |||
4 4 | |||
752 20 1180 | |||
[ | |||
t l | |||
5 0 | |||
21 1178 6 | |||
0 22 1140 l | |||
7 258 23 1162 8 | |||
957 24 1134 9 | |||
883 25 1152 t | |||
j 10 1141 26 919 11 1086 27 1003 12 1112 28 1181 j | |||
i 13 1158 29 1044 i | |||
14 1175 30 1053 15 1181 31 1142 i | |||
16 1188 N/A l | |||
i t | |||
l | |||
? | |||
i | i | ||
? | |||
e i | |||
H00PAUG/SCMPFLR f | |||
f. | f. | ||
Attachnent 3 to GNRO-92/00115 UNIT SHUTDOWNS AND POWER REDUCTIONS | Attachnent 3 to GNRO-92/00115 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. | ||
DOCKET NO. 50-416 UNIT NAME | 50-416 UNIT NAME 1 | ||
DATE | DATE 09/04/92 ' | ||
COMPLETED BY | COMPLETED BY L. F. Daughtery TELEPHONE 601-437-2334 REPORT MONTH August 1992 i | ||
Method of | |||
92- | ' Licensee Cause & Corrective No. | ||
Date Type Duration Reason Shutting Down Event System Component Actior. To (1) | |||
Hours (2) | |||
Reactor Report # | |||
Code Code Prevent Recurrence (3) | |||
(4) | |||
(5) | |||
(C&CA) 92-08/04/92 F | |||
65.0 A | |||
3 92-017 TJ LT Reactor scram due to a spurious low primary cooling water tank 006 level signal when performing a grour.dit.g test with the test system malfunctioning. | |||
92-08/26/92 S | |||
39.6 H | |||
5 NA NA NA System dispatcher requested power reduction for grid stability-007 during Hurricane Andrew. | |||
f l | f l | ||
UNIT SHUTDOWNS AND POWER REDUCTIONS 4 | UNIT SHUTDOWNS AND POWER REDUCTIONS 3 | ||
Exhibit G - Instruc tions | 4 i | ||
F: Forced | I 2' | ||
A-Equipment Failure | Method: | ||
C-Rafueling | Exhibit G - Instruc tions F: Forced Reason: | ||
S:. Scheduled A-Equipment Failure 1-Manual for Preparation of Data (Explain) 2-Manual Scram Entry Sheets for Licensee B-Maintenance or Test. | |||
3-Automatic Scram Event Report (LER) | |||
C-Rafueling 4-Continued File (NUREG-0161) i | |||
} | } | ||
D-Regulatory Restriction | D-Regulatory Restriction 5-Reduced load E-Operator Training & | ||
Licensing Examination F-Administrative | 6-Other. | ||
Licensing Examination F-Administrative 5 | |||
G-Operational Error Exhibit 1-Same Source (Explain) | |||
H-Other (Explain) 4 I | H-Other (Explain) 4 I | ||
M00PAUG/SCMPFLR l | M00PAUG/SCMPFLR l | ||
L | L | ||
MAIN STEAM SAFETY RELIEF YALVE CHALLENGES | MAIN STEAM SAFETY RELIEF YALVE CHALLENGES DOCKET NO. | ||
50-416 4 | |||
UNIT 1 | |||
i COMPLETED BY T. M. CARTER TELEPHONE 1601) 437-245T | |||
~ | |||
04.cc of Occurrence: | 04.cc of Occurrence: | ||
Plant Operating Condition: | August 04, 1992 Plant Operating Condition: | ||
Rx Thermal Power 100% | Rx Thermal Power 100% | ||
Number of SRVs affected by event: | Rx Pressure (psia) 1047.9 Rx Mode 1 | ||
Rx Power (MWE) 1225.6 Rx Temperatures 545 F Number of mainsteam line SRVs: | |||
20 Number of SRVs affected by event: | |||
2 Narrative: | |||
On August 4, 1992, I reactor scram occurred due to primary water low generator trip. | On August 4, 1992, I reactor scram occurred due to primary water low generator trip. | ||
a The following SRV's actuated automatically once: | a The following SRV's actuated automatically once: | ||
B21-F051B B21-F0510 1 | B21-F051B B21-F0510 1 | ||
4 5 | 4 5 | ||
M M00PAUG/SCMPFLR i | M M00PAUG/SCMPFLR i | ||
l 1 | |||
r t | r t | ||
_}} | |||
Latest revision as of 03:20, 13 December 2024
| ML20105B538 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 08/31/1992 |
| From: | Ted Carter, Daughtery L ENTERGY OPERATIONS, INC. |
| To: | |
| Shared Package | |
| ML20105B539 | List: |
| References | |
| NUDOCS 9209210013 | |
| Download: ML20105B538 (4) | |
Text
.
f I to GNR0-92/001Li DOCKET NO.
50-416 DATE 09/04/92 COMPLETED BY L. F. Daughtery TELEPHONE (601)437-2334-OPERATING STATUS 1.
Unit Name: GGNS UNIT 1 Notes:
[
2.
Reporting Period: A_ugust 1992 3.
Licensed Thermal Power (MWT): 3833 MWT 4.
NameplateRating(GrossMWE): 1372.5 MWT 5,
Design Electrical Rating (Net MWe): 1250 MWE l
6.
Maximum Dependable Capacity (Gross MWe): 1190 MWF; 7.
Maximum Dependable Capacity (Net MWe): 1143 MWE 8.
If Changes Occur in Capacity Ratings (Items Numlier TThrough 7) Since Last Report.
Give Reasons:
N/A 9.
Power Level To Which Restricted, In Any (Wet MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr to Date Cumulative
- 11. Hours In Reporting Pericd 744 S,855 68,967
- 12. Number of Hours Reactor Was Critical 702.0' 4,420.0 54,617.1
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 679.6-4,234.3 52,284,.7
- 15. Unit Reserve Shutdown 1:aurs 0~
0 0
- 16. Gross Thermal Energy Generated (MWH) 2,466T47i 15,380,325 181 TOT,3I5
- 17. 'iross Elect.'ical Energy Generated (MWH) 780,844 4,901,436 57,471,546
_ 700,748 14,961,463
- 18. Net Electrical Energy Generated (MWH) 748,890 4,
- 19. Unit Service Factor 91.3 72.3 78.3
~
- 20. Unit Availability Factor 91.1 72.3 78.3
- 21. Unit Capacity Factor (Using MDC Net) 88.1 70.2 74 6
- 22. Unit Capacity Factor (Using DER Net) 80.5 64.2 67.6
- 23. Unit Forced Outage Rate 8.7 7.8 6.6
- 24. Shutdowns Seneduled Over Next 6 Months (Type, Date, and Duration of Each):
s
- 25. If Shut Down At End of Report Period.
Estimated pate of Startup:
- 26. Units In Test Status (Prior to Commercial Operation).
Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84
~
COMMERCIAL OPERATION 07/01/86 9209210013 920914 PDR ADOCK 05 COO 416 R
i 4 to GNRO-92/00115 l
r i
e DOCKET NO.
50-416 1
UNIT 1
i i
DATE 09/04/92 i
COMPLETED BY L. F. Daughtery TELEPHONE 501-437-2334 i
MONTH August 1992
~;
0 "'
AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i
(MWe-Net)
(MWe-Net) 1 1140 17 -
1186 i
2 1170 18 1182 l
3 1169 19 1180 l
4 4
752 20 1180
[
t l
5 0
21 1178 6
0 22 1140 l
7 258 23 1162 8
957 24 1134 9
883 25 1152 t
j 10 1141 26 919 11 1086 27 1003 12 1112 28 1181 j
i 13 1158 29 1044 i
14 1175 30 1053 15 1181 31 1142 i
16 1188 N/A l
i t
l
?
i
?
e i
H00PAUG/SCMPFLR f
f.
Attachnent 3 to GNRO-92/00115 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-416 UNIT NAME 1
DATE 09/04/92 '
COMPLETED BY L. F. Daughtery TELEPHONE 601-437-2334 REPORT MONTH August 1992 i
Method of
' Licensee Cause & Corrective No.
Date Type Duration Reason Shutting Down Event System Component Actior. To (1)
Hours (2)
Reactor Report #
Code Code Prevent Recurrence (3)
(4)
(5)
(C&CA) 92-08/04/92 F
65.0 A
3 92-017 TJ LT Reactor scram due to a spurious low primary cooling water tank 006 level signal when performing a grour.dit.g test with the test system malfunctioning.
92-08/26/92 S
39.6 H
5 NA NA NA System dispatcher requested power reduction for grid stability-007 during Hurricane Andrew.
f l
UNIT SHUTDOWNS AND POWER REDUCTIONS 3
4 i
I 2'
Method:
Exhibit G - Instruc tions F: Forced Reason:
S:. Scheduled A-Equipment Failure 1-Manual for Preparation of Data (Explain) 2-Manual Scram Entry Sheets for Licensee B-Maintenance or Test.
3-Automatic Scram Event Report (LER)
C-Rafueling 4-Continued File (NUREG-0161) i
}
D-Regulatory Restriction 5-Reduced load E-Operator Training &
6-Other.
Licensing Examination F-Administrative 5
G-Operational Error Exhibit 1-Same Source (Explain)
H-Other (Explain) 4 I
M00PAUG/SCMPFLR l
L
MAIN STEAM SAFETY RELIEF YALVE CHALLENGES DOCKET NO.
50-416 4
UNIT 1
i COMPLETED BY T. M. CARTER TELEPHONE 1601) 437-245T
~
04.cc of Occurrence:
August 04, 1992 Plant Operating Condition:
Rx Thermal Power 100%
Rx Pressure (psia) 1047.9 Rx Mode 1
Rx Power (MWE) 1225.6 Rx Temperatures 545 F Number of mainsteam line SRVs:
20 Number of SRVs affected by event:
2 Narrative:
On August 4, 1992, I reactor scram occurred due to primary water low generator trip.
a The following SRV's actuated automatically once:
B21-F051B B21-F0510 1
4 5
M M00PAUG/SCMPFLR i
l 1
r t
_