f I                                                                           Attachment 1 to GNR0-92/001Li DOCKET NO.                 50-416 DATE                       09/04/92 COMPLETED BY                 L. F. Daughtery TELEPHONE                     (601)437-2334-OPERATING STATUS
f I to GNR0-92/001Li DOCKET NO.
: 1. Unit Name: GGNS UNIT 1                                         Notes:                                                                           [
50-416 DATE 09/04/92 COMPLETED BY L. F. Daughtery TELEPHONE (601)437-2334-OPERATING STATUS 1.
: 2. Reporting Period: A_ugust 1992
Unit Name: GGNS UNIT 1 Notes:
: 3. Licensed Thermal Power (MWT): 3833 MWT
[
: 4. NameplateRating(GrossMWE): 1372.5 MWT 5,   Design Electrical Rating (Net MWe): 1250 MWE               l
2.
: 6. Maximum Dependable Capacity (Gross MWe): 1190 MWF;
Reporting Period: A_ugust 1992 3.
: 7. Maximum Dependable Capacity (Net MWe): 1143 MWE
Licensed Thermal Power (MWT): 3833 MWT 4.
: 8. If Changes Occur in Capacity Ratings (Items Numlier TThrough 7) Since Last Report.
NameplateRating(GrossMWE): 1372.5 MWT 5,
Design Electrical Rating (Net MWe): 1250 MWE l
6.
Maximum Dependable Capacity (Gross MWe): 1190 MWF; 7.
Maximum Dependable Capacity (Net MWe): 1143 MWE 8.
If Changes Occur in Capacity Ratings (Items Numlier TThrough 7) Since Last Report.
Give Reasons:
Give Reasons:
N/A 9.
Power Level To Which Restricted, In Any (Wet MWe):
N/A
N/A
: 9. Power Level To Which Restricted, In Any (Wet MWe):                N/A
: 10. Reasons For Restrictions, If Any:
: 10. Reasons For Restrictions, If Any:         N/A                                                                     __
N/A This Month Yr to Date Cumulative
This Month                                                     Yr to Date     Cumulative
: 11. Hours In Reporting Pericd 744 S,855 68,967
: 11. Hours In Reporting Pericd                                   744                                                         S,855       68,967
: 12. Number of Hours Reactor Was Critical 702.0' 4,420.0 54,617.1
: 12. Number of Hours Reactor Was Critical                       702.0'                                                       4,420.0     54,617.1
: 13. Reactor Reserve Shutdown Hours 0
: 13. Reactor Reserve Shutdown Hours                               0                                                             0         0
0 0
: 14. Hours Generator On-Line                                     679.6-                                                       4,234.3     52,284,.7
: 14. Hours Generator On-Line 679.6-4,234.3 52,284,.7
: 15. Unit Reserve Shutdown 1:aurs                                 0~                                                             0         0
: 15. Unit Reserve Shutdown 1:aurs 0~
: 16. Gross Thermal Energy Generated (MWH)                     2,466T47i                                                   15,380,325   181 TOT,3I5
0 0
: 17. 'iross Elect.'ical Energy Generated (MWH)                 780,844                                                     4,901,436   57,471,546
: 16. Gross Thermal Energy Generated (MWH) 2,466T47i 15,380,325 181 TOT,3I5
: 18. Net Electrical Energy Generated (MWH)                     748,890                                                 _4,700,748    14,961,463
: 17. 'iross Elect.'ical Energy Generated (MWH) 780,844 4,901,436 57,471,546
: 19. Unit Service Factor                                 ~
_ 700,748 14,961,463
91.3                                                         72.3         78.3
: 18. Net Electrical Energy Generated (MWH) 748,890 4,
: 20. Unit Availability Factor                                       91.1                                                         72.3         78.3
: 19. Unit Service Factor 91.3 72.3 78.3
: 21. Unit Capacity Factor (Using MDC Net)                           88.1                                                 ,
~
70.2         74 6
: 20. Unit Availability Factor 91.1 72.3 78.3
: 22. Unit Capacity Factor (Using DER Net)                           80.5                                                         64.2         67.6
: 21. Unit Capacity Factor (Using MDC Net) 88.1 70.2 74 6
: 23. Unit Forced Outage Rate                                         8.7                                                           7.8         6.6
: 22. Unit Capacity Factor (Using DER Net) 80.5 64.2 67.6
: 23. Unit Forced Outage Rate 8.7 7.8 6.6
: 24. Shutdowns Seneduled Over Next 6 Months (Type, Date, and Duration of Each):
: 24. Shutdowns Seneduled Over Next 6 Months (Type, Date, and Duration of Each):
s
s
: 25. If Shut Down At End of Report Period.     Estimated pate of Startup:
: 25. If Shut Down At End of Report Period.
Estimated pate of Startup:
: 26. Units In Test Status (Prior to Commercial Operation).
: 26. Units In Test Status (Prior to Commercial Operation).
Forecast                                                       Achieved INITIAL CRITICALITY                                                                                 08/18/82 INITIAL ELECTRICITY                 ~
Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84
10/20/84 COMMERCIAL OPERATION                                                                                 07/01/86 9209210013 920914 PDR       ADOCK 05 COO 416 R                   PDR
~
COMMERCIAL OPERATION 07/01/86 9209210013 920914 PDR ADOCK 05 COO 416 R
PDR


i 4
i 4 to GNRO-92/00115 l
Attachment 2 to GNRO-92/00115
r i
  .,                                                                                                                              l r
e DOCKET NO.
e                                                                                                                                 i 1                                                      DOCKET NO.             50-416                                           .!
50-416 1
UNIT 1
i i
DATE 09/04/92 i
COMPLETED BY L. F. Daughtery TELEPHONE 501-437-2334 i
MONTH August 1992
~;
0 "'
AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i
(MWe-Net)
(MWe-Net) 1 1140 17 -
1186 i
2 1170 18 1182 l
3 1169 19 1180 l
4 4
752 20 1180
[
t l
5 0
21 1178 6
0 22 1140 l
7 258 23 1162 8
957 24 1134 9
883 25 1152 t
j 10 1141 26 919 11 1086 27 1003 12 1112 28 1181 j
i 13 1158 29 1044 i
14 1175 30 1053 15 1181 31 1142 i
16 1188 N/A l
i t
l
?
i
i
!                                                      UNIT                  1 i                                                      DATE                  09/04/92                                          ;
?
i                                                      COMPLETED BY          L. F. Daughtery                                    ,
e i
TELEPHONE            501-437-2334 i                                                                                                                                !
H00PAUG/SCMPFLR f
MONTH        August 1992
~;            0 "'      AVERAGE DAILY POWER LEVEL      DAY      AVERAGE DAILY POWER LEVEL                                      i (MWe-Net)                              (MWe-Net) 1                      1140            17 -                      1186 i
2                        1170            18                        1182                                          ;
l            3                        1169            19                        1180                                          .
l 4
4                        752            20                        1180                                          [
.                                                                                                                                t 5                          0            21                        1178 l
6                          0            22                        1140                                          l
:              7                        258            23                        1162                                          ;
8                        957            24                        1134 9                        883            25                        1152                                          t j              10                      1141            26                          919 11                      1086            27                        1003 j              12                      1112            28                        1181                                          ;
i              13                      1158            29                        1044 i
14                      1175            30                        1053 15                      1181            31                          1142                                          :
i 16                      1188                                        N/A                                          l i
t
                                                                                                                                  ?
l i                                                                                                                                 !
                                                                                                                                  ?
e i                            H00PAUG/SCMPFLR
',                                                                                                                                f


f.
f.
Attachnent 3 to GNRO-92/00115 UNIT SHUTDOWNS AND POWER REDUCTIONS                                                 '
Attachnent 3 to GNRO-92/00115 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
DOCKET NO. 50-416 UNIT NAME     1                 _
50-416 UNIT NAME 1
DATE           09/04/92 '
DATE 09/04/92 '
COMPLETED BY   L. F. Daughtery TELEPHONE     601-437-2334 REPORT MONTH August 1992 i                         Method of   ' Licensee                             Cause & Corrective No.     Date     Type       Duration   Reason   Shutting Down     Event     System Component           Actior. To Hours     (2)         Reactor     Report #     Code   Code           Prevent Recurrence (1)
COMPLETED BY L. F. Daughtery TELEPHONE 601-437-2334 REPORT MONTH August 1992 i
(3)                      (4)     (5)                 (C&CA) 65.0                       3     92-017       TJ       LT     Reactor scram due to a spurious 92-    08/04/92    F                      A 006 low primary cooling water tank level signal when performing a grour.dit.g test with the test system malfunctioning.
Method of
92-                           39.6                       5         NA         NA       NA     System dispatcher requested power 08/26/92    S                      H reduction for grid stability-007 during Hurricane Andrew.
' Licensee Cause & Corrective No.
Date Type Duration Reason Shutting Down Event System Component Actior. To (1)
Hours (2)
Reactor Report #
Code Code Prevent Recurrence (3)
(4)
(5)
(C&CA) 92-08/04/92 F
65.0 A
3 92-017 TJ LT Reactor scram due to a spurious low primary cooling water tank 006 level signal when performing a grour.dit.g test with the test system malfunctioning.
92-08/26/92 S
39.6 H
5 NA NA NA System dispatcher requested power reduction for grid stability-007 during Hurricane Andrew.
f l
f l
UNIT SHUTDOWNS AND POWER REDUCTIONS 4                                             i I                       2'                                     3                                      _
UNIT SHUTDOWNS AND POWER REDUCTIONS 3
Exhibit G - Instruc tions Method:                                                                    !
4 i
F: Forced             Reason:
I 2'
A-Equipment Failure                     1-Manual                       for Preparation of Data S: . Scheduled                                                                                Entry Sheets for Licensee (Explain)                         2-Manual Scram B-Maintenance or Test.                 3-Automatic Scram             Event Report (LER)
Method:
C-Rafueling                             4-Continued                   File (NUREG-0161) i
Exhibit G - Instruc tions F: Forced Reason:
S:. Scheduled A-Equipment Failure 1-Manual for Preparation of Data (Explain) 2-Manual Scram Entry Sheets for Licensee B-Maintenance or Test.
3-Automatic Scram Event Report (LER)
C-Rafueling 4-Continued File (NUREG-0161) i
}
}
D-Regulatory Restriction               5-Reduced load E-Operator Training &                   6-Other.
D-Regulatory Restriction 5-Reduced load E-Operator Training &
Licensing Examination F-Administrative                                                   5 G-Operational Error                                                   Exhibit 1-Same Source (Explain)
6-Other.
Licensing Examination F-Administrative 5
G-Operational Error Exhibit 1-Same Source (Explain)
H-Other (Explain) 4 I
H-Other (Explain) 4 I
M00PAUG/SCMPFLR l
M00PAUG/SCMPFLR l
L
L


MAIN STEAM SAFETY RELIEF YALVE CHALLENGES 4                                                      DOCKET NO.           50-416
MAIN STEAM SAFETY RELIEF YALVE CHALLENGES DOCKET NO.
.                                                      UNIT                   1         i COMPLETED BY T. M. CARTER TELEPHONE   1601) 437-245T       ,
50-416 4
August 04, 1992
UNIT 1
~
i COMPLETED BY T. M. CARTER TELEPHONE 1601) 437-245T
~
04.cc of Occurrence:
04.cc of Occurrence:
Plant Operating Condition:
August 04, 1992 Plant Operating Condition:
Rx Thermal Power 100%         Rx Pressure (psia) 1047.9         Rx Mode   1 Rx Power (MWE)     1225.6     Rx Temperatures     545 F Number of mainsteam line SRVs:       20                                         ,
Rx Thermal Power 100%
Number of SRVs affected by event:       2 Narrative:
Rx Pressure (psia) 1047.9 Rx Mode 1
Rx Power (MWE) 1225.6 Rx Temperatures 545 F Number of mainsteam line SRVs:
20 Number of SRVs affected by event:
2 Narrative:
On August 4, 1992, I reactor scram occurred due to primary water low generator trip.
On August 4, 1992, I reactor scram occurred due to primary water low generator trip.
a The following SRV's actuated automatically once:
a The following SRV's actuated automatically once:
B21-F051B B21-F0510 1
B21-F051B B21-F0510 1
4 5
4 5
M M00PAUG/SCMPFLR i                                                                                         l 1
M M00PAUG/SCMPFLR i
l 1
r t
r t
                                                                      -, _          . _}}
_}}

Latest revision as of 03:20, 13 December 2024

Monthly Operating Rept for Aug 1992 for Grand Gulf Nuclear Station,Unit 1
ML20105B538
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/31/1992
From: Ted Carter, Daughtery L
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20105B539 List:
References
NUDOCS 9209210013
Download: ML20105B538 (4)


Text

.

f I to GNR0-92/001Li DOCKET NO.

50-416 DATE 09/04/92 COMPLETED BY L. F. Daughtery TELEPHONE (601)437-2334-OPERATING STATUS 1.

Unit Name: GGNS UNIT 1 Notes:

[

2.

Reporting Period: A_ugust 1992 3.

Licensed Thermal Power (MWT): 3833 MWT 4.

NameplateRating(GrossMWE): 1372.5 MWT 5,

Design Electrical Rating (Net MWe): 1250 MWE l

6.

Maximum Dependable Capacity (Gross MWe): 1190 MWF; 7.

Maximum Dependable Capacity (Net MWe): 1143 MWE 8.

If Changes Occur in Capacity Ratings (Items Numlier TThrough 7) Since Last Report.

Give Reasons:

N/A 9.

Power Level To Which Restricted, In Any (Wet MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr to Date Cumulative

11. Hours In Reporting Pericd 744 S,855 68,967
12. Number of Hours Reactor Was Critical 702.0' 4,420.0 54,617.1
13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 679.6-4,234.3 52,284,.7
15. Unit Reserve Shutdown 1:aurs 0~

0 0

16. Gross Thermal Energy Generated (MWH) 2,466T47i 15,380,325 181 TOT,3I5
17. 'iross Elect.'ical Energy Generated (MWH) 780,844 4,901,436 57,471,546

_ 700,748 14,961,463

18. Net Electrical Energy Generated (MWH) 748,890 4,
19. Unit Service Factor 91.3 72.3 78.3

~

20. Unit Availability Factor 91.1 72.3 78.3
21. Unit Capacity Factor (Using MDC Net) 88.1 70.2 74 6
22. Unit Capacity Factor (Using DER Net) 80.5 64.2 67.6
23. Unit Forced Outage Rate 8.7 7.8 6.6
24. Shutdowns Seneduled Over Next 6 Months (Type, Date, and Duration of Each):

s

25. If Shut Down At End of Report Period.

Estimated pate of Startup:

26. Units In Test Status (Prior to Commercial Operation).

Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84

~

COMMERCIAL OPERATION 07/01/86 9209210013 920914 PDR ADOCK 05 COO 416 R

PDR

i 4 to GNRO-92/00115 l

r i

e DOCKET NO.

50-416 1

UNIT 1

i i

DATE 09/04/92 i

COMPLETED BY L. F. Daughtery TELEPHONE 501-437-2334 i

MONTH August 1992

~;

0 "'

AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i

(MWe-Net)

(MWe-Net) 1 1140 17 -

1186 i

2 1170 18 1182 l

3 1169 19 1180 l

4 4

752 20 1180

[

t l

5 0

21 1178 6

0 22 1140 l

7 258 23 1162 8

957 24 1134 9

883 25 1152 t

j 10 1141 26 919 11 1086 27 1003 12 1112 28 1181 j

i 13 1158 29 1044 i

14 1175 30 1053 15 1181 31 1142 i

16 1188 N/A l

i t

l

?

i

?

e i

H00PAUG/SCMPFLR f

f.

Attachnent 3 to GNRO-92/00115 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-416 UNIT NAME 1

DATE 09/04/92 '

COMPLETED BY L. F. Daughtery TELEPHONE 601-437-2334 REPORT MONTH August 1992 i

Method of

' Licensee Cause & Corrective No.

Date Type Duration Reason Shutting Down Event System Component Actior. To (1)

Hours (2)

Reactor Report #

Code Code Prevent Recurrence (3)

(4)

(5)

(C&CA) 92-08/04/92 F

65.0 A

3 92-017 TJ LT Reactor scram due to a spurious low primary cooling water tank 006 level signal when performing a grour.dit.g test with the test system malfunctioning.

92-08/26/92 S

39.6 H

5 NA NA NA System dispatcher requested power reduction for grid stability-007 during Hurricane Andrew.

f l

UNIT SHUTDOWNS AND POWER REDUCTIONS 3

4 i

I 2'

Method:

Exhibit G - Instruc tions F: Forced Reason:

S:. Scheduled A-Equipment Failure 1-Manual for Preparation of Data (Explain) 2-Manual Scram Entry Sheets for Licensee B-Maintenance or Test.

3-Automatic Scram Event Report (LER)

C-Rafueling 4-Continued File (NUREG-0161) i

}

D-Regulatory Restriction 5-Reduced load E-Operator Training &

6-Other.

Licensing Examination F-Administrative 5

G-Operational Error Exhibit 1-Same Source (Explain)

H-Other (Explain) 4 I

M00PAUG/SCMPFLR l

L

MAIN STEAM SAFETY RELIEF YALVE CHALLENGES DOCKET NO.

50-416 4

UNIT 1

i COMPLETED BY T. M. CARTER TELEPHONE 1601) 437-245T

~

04.cc of Occurrence:

August 04, 1992 Plant Operating Condition:

Rx Thermal Power 100%

Rx Pressure (psia) 1047.9 Rx Mode 1

Rx Power (MWE) 1225.6 Rx Temperatures 545 F Number of mainsteam line SRVs:

20 Number of SRVs affected by event:

2 Narrative:

On August 4, 1992, I reactor scram occurred due to primary water low generator trip.

a The following SRV's actuated automatically once:

B21-F051B B21-F0510 1

4 5

M M00PAUG/SCMPFLR i

l 1

r t