                                                                                                        ' UNIT SHUTDOWNS AND POWER REDUCTIONS
' UNIT SHUTDOWNS AND POWER REDUCTIONS
: :U 7Pc                                                                                                                                           DOCKET NO.     50-461-EE3                                                                                                                                             . UNIT Clinton 1 d                                                                                                                                         DATE 03/31/91 Dr.a                                                                                                                               COMPLETED BY       F. A. Spannenberc. III EU3                                                                                                                                   TELEPHONE' (217) 935-8881 X3400 gy                                                                                                 REPORT MONTH March 1991 C -O vi" ME"dOD OF coo
: :U 7Pc DOCKET NO.
            @                                                            TYPE                                                                 5 HUTTING DOWN
50-461-EE3
['         -        NO.                                        DATE F: ' FORCED           DURATION
. UNIT Clinton 1 d
                                                                        -S: ' SCHEDULED- (HOURS)           REASON (1)
DATE 03/31/91 Dr.a COMPLETED BY F.
THE REACTOR OR        CORRECTIVE ACTIONS REDUCING POWER (2) / COMMENTS 90-08 901014                                                       F   188.4       B:   Forced extension of the       4:   Continued shutdown 90-08 second refueling outage to correct deficiencies, including 120 hours to make repairs to misaligned and damaged Residual Heat Removal system suction line pipe hangers, identified during the second refueling outage (RF-2) not related to work originally in the RF-2 scope.
A.
91-01 910309                                                       F   16.8       A:   Due to problems experienced 1; Operators Manually Tripped the while transferring loads           Turbine. Reactor power was to the generator bus, operators maintained at approximately 15%.
Spannenberc. III EU3 TELEPHONE' (217) 935-8881 X3400 gy REPORT MONTH March 1991 C -O vi" ME"dOD OF coo TYPE 5 HUTTING DOWN
manually tripped the turbine.     Investigation determined that a transducer was not reinstalled in y~                                      the Unit Auxiliary Transformer during maintenance performed during RF-2.
['
F: ' FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS NO.
DATE
-S: ' SCHEDULED- (HOURS)
REASON (1)
REDUCING POWER (2) / COMMENTS 90-08 901014 F
188.4 B:
Forced extension of the 4:
Continued shutdown 90-08 second refueling outage to correct deficiencies, including 120 hours to make repairs to misaligned and damaged Residual Heat Removal system suction line pipe hangers, identified during the second refueling outage (RF-2) not related to work originally in the RF-2 scope.
91-01 910309 F
16.8 A:
Due to problems experienced 1; Operators Manually Tripped the while transferring loads Turbine. Reactor power was to the generator bus, operators maintained at approximately 15%.
manually tripped the turbine.
Investigation determined that a transducer was not reinstalled in the Unit Auxiliary Transformer y~
during maintenance performed during RF-2.
(1) Reason A-Equipment Failure (explain), B-Maintenance or Test, C-Refueling, D-Regulatory Restriction, E-Operator '. raining & License Examination, F-Administrative, G-Operational Error.-(explain),
(1) Reason A-Equipment Failure (explain), B-Maintenance or Test, C-Refueling, D-Regulatory Restriction, E-Operator '. raining & License Examination, F-Administrative, G-Operational Error.-(explain),
H-Other (2) Method 1-Manual, 2-Manual Scram, 3-Auto Scram, 4-Continued
H-Other (2) Method 1-Manual, 2-Manual Scram, 3-Auto Scram, 4-Continued
_. _      . _ .              -.      _}}
_}}

Latest revision as of 03:32, 15 December 2024

Revised Monthly Operating Rept for Mar 1991 for Clinton Power Station Unit 1
ML20073L380
Person / Time
Site: Clinton Constellation icon.png
Issue date: 03/31/1991
From:
ILLINOIS POWER CO.
To:
Shared Package
ML20073L320 List:
References
NUDOCS 9105130312
Download: ML20073L380 (1)


Text

... _ _. _

e.

Revision to-Page 4 of 4:

.. Attachment 1 to U-601824

~

' UNIT SHUTDOWNS AND POWER REDUCTIONS

:U 7Pc DOCKET NO.

50-461-EE3

. UNIT Clinton 1 d

DATE 03/31/91 Dr.a COMPLETED BY F.

A.

Spannenberc. III EU3 TELEPHONE' (217) 935-8881 X3400 gy REPORT MONTH March 1991 C -O vi" ME"dOD OF coo TYPE 5 HUTTING DOWN

['

F: ' FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS NO.

DATE

-S: ' SCHEDULED- (HOURS)

REASON (1)

REDUCING POWER (2) / COMMENTS 90-08 901014 F

188.4 B:

Forced extension of the 4:

Continued shutdown 90-08 second refueling outage to correct deficiencies, including 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> to make repairs to misaligned and damaged Residual Heat Removal system suction line pipe hangers, identified during the second refueling outage (RF-2) not related to work originally in the RF-2 scope.

91-01 910309 F

16.8 A:

Due to problems experienced 1; Operators Manually Tripped the while transferring loads Turbine. Reactor power was to the generator bus, operators maintained at approximately 15%.

manually tripped the turbine.

Investigation determined that a transducer was not reinstalled in the Unit Auxiliary Transformer y~

during maintenance performed during RF-2.

(1) Reason A-Equipment Failure (explain), B-Maintenance or Test, C-Refueling, D-Regulatory Restriction, E-Operator '. raining & License Examination, F-Administrative, G-Operational Error.-(explain),

H-Other (2) Method 1-Manual, 2-Manual Scram, 3-Auto Scram, 4-Continued

_