Revision to-Page 4 of 4:
.. Attachment 1 to U-601824
~
' UNIT SHUTDOWNS AND POWER REDUCTIONS
- :U 7Pc DOCKET NO.
50-461-EE3
. UNIT Clinton 1 d
DATE 03/31/91 Dr.a COMPLETED BY F.
A.
Spannenberc. III EU3 TELEPHONE' (217) 935-8881 X3400 gy REPORT MONTH March 1991 C -O vi" ME"dOD OF coo TYPE 5 HUTTING DOWN
['
F: ' FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS NO.
DATE
-S: ' SCHEDULED- (HOURS)
REASON (1)
REDUCING POWER (2) / COMMENTS 90-08 901014 F
188.4 B:
Forced extension of the 4:
Continued shutdown 90-08 second refueling outage to correct deficiencies, including 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> to make repairs to misaligned and damaged Residual Heat Removal system suction line pipe hangers, identified during the second refueling outage (RF-2) not related to work originally in the RF-2 scope.
91-01 910309 F
16.8 A:
Due to problems experienced 1; Operators Manually Tripped the while transferring loads Turbine. Reactor power was to the generator bus, operators maintained at approximately 15%.
manually tripped the turbine.
Investigation determined that a transducer was not reinstalled in the Unit Auxiliary Transformer y~
during maintenance performed during RF-2.
(1) Reason A-Equipment Failure (explain), B-Maintenance or Test, C-Refueling, D-Regulatory Restriction, E-Operator '. raining & License Examination, F-Administrative, G-Operational Error.-(explain),
H-Other (2) Method 1-Manual, 2-Manual Scram, 3-Auto Scram, 4-Continued