{{#Wiki_filter:C a Progress Energy                              Continuous Use PROGRESS ENERGY CRYSTAL RIVER UNIT 3 PLANT OPERATING MANUAL SP-1 78 CONTAINMENT LEAKAGE TEST-TYPE "A" INCLUDING LINER PLATE SP-1 78                      Rev. 30              Page 1 of 2070A_
{{#Wiki_filter:}}
 
TABLE OF CONTENTS SECTION                                                                                                                      PAGE 1.0  PURPOSE .............................................                                                        ............. 4 1.1  Intent .....................................................................................................          4 1.2  Equipm ent Database (EDB) ...................................................................                        4 2.0  References ....................................................................................................            4 2.1  Com m itm ent Docum ents ........................................................................                    4 2.2  Reference Docum ents ...........................................................................                      5 3.0  PERSONNEL INDOCTRINATION ...................................................................                                6 3.1  Description ............................................................................................              6 3.2  Definitions ..............................................................................................            7 3.3  Responsibilities ..........................................................................................          8 3.4  Prerequisites ..........................................................................................              9 3.5  Lim its and Precautions ..........................................................................                  23 3.6  Acceptance Criteria ..............................................................................                  26 3.7  Setpoints ...............................................................................................            26 4.0  INSTRUCTIONS .............................................................................................                27 4.1  Initial Conditions ..................................................................................                27 4.2  Pressurization of Reactor Containm ent .................................................                            27 4.3  Stabilization Phase ..............................................................................                  33 4.4  Hold Test Phase ..................................................................................                  36 4.5  Verification Test ..................................................................................                43 4.6  Depressurization ......................................................................................              48 4.7  Final ILRT Results ................................................................................                  53 5.0  FOLLOW UP ACTIO NS ..................................................................................                      55 5.1  Contingencies ......................................................................................                55 6.0  RESTO RATION ...............................................................................................              55 6.1  Restoration Instructions .......................................................................                    55 7.0  COM MENTS ...................................................................................................              60 8.0  EVALUATION '....................                                                            ............................ 63 8.1  Equipm ent Perform ance Review .........................................................                            63 SP-178                                                      Rev. 30                                                            Page 2 of 207
 
Atta c h m e n t 1 ...............................................................................................................................                  64 Atta c hm e n t 2 ..............................................................................................................................                    65 Atta ch m e nt 3 ...............................................................................................................................                    71 A tta c hm e nt 3a .............................................................................................................................                    81 Atta c h m e nt 3 b .............................................................................................................................                  93 Atta ch m e nt 3d ........................................................................................................                ................... 12 6 A tta c h m e nt 3e ...........................................................................................................................                    12 7 Atta c h m e nt 3f ............................................................................................................................                    13 3  ...........................................................                                                                                    ..... 134  ......................................................................                                                                                141                                                .................................................                                                ..... 158  ..............................................................                                                                                  .... 159  ......................................................                                                                                                160                                                ......................................................                                                  161 0                                              .....................................................                                                  167 Atta c h m e nt 1 1 ...............................................................................................................                      . .. 17 3 Atta c h m e nt 12 ..............................................................................................................                    ........... 18 5 3 .....................................................................................................                                          .... 188 4 ....................................................................................................                                          .... 189 5 .....................................................................................................                                        ..... 191 6 ...................................................................................................                                              ... 199 7 ......                    ........................................................................................                  ....... 200 Atta c h m e nt 18 ...........................................................................................................................                    206 SP-178                                                                          Rev. 30                                                                          Page 3 of 207
 
1.0    PURPOSE 1.1    Intent 1.1.1  This procedure establishes the requirements to assure that leakage through the primary reactor containment, and systems and components penetrating the primary containment does not exceed the allowable leakage rate values as specified in Technical Specification 5.6.2.20 and 10CFR50, Appendix J, Option B.
1.1.2  Testing shall be performed using the methods and provisions of:
Total-time method using the provisions of BN-TOP-1 OR Mass-point method as specified in ANSI/ANS-56.8-1994.
1.1.3  This test satisfies the Type Atest requirements of 10CFR50, Appendix J. Type A tests (overall integrated containment leakage rate) shall be conducted during shutdown at a frequency specified in TS 5.6.2.20 and the Containment Leakage Rate Testing Program.
1.2    Equipment Database (EDB) 1.2.1  The following tags are listed in the EDB as being affected by this procedure:
See Attachments 3 and 4.
 
==2.0    REFERENCES==
 
2.1    Commitment Documents 2.1.1  Title 10, Code of Federal Regulations, Part 50, Appendix J, Option B 2.1.2  "Containment System Leakage Testing Requirements" American National Standard ANSI/ANS 56.8-1994.
2.1.3  "Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J" NEI 94-01, July 26, 1995.
2.1.4  "Performance-Based Containment Leak-Test Program," USNRC Regulatory Guide 1.163, September 1995.
2.1.5  Technical Specification 5.6.2.20, Containment Leakage Rate Testing Program 2.1.6  Containment Leakage Rate Testing Program, Crystal River Unit 3 SP-1 78                                    Rev. 30                                Page 4 of 207
 
2.1.7  Technical Specification References Applicable        Surv. Per.        LCO/Other                Surv.      Freq.
References        During Modes      Requirements During      Freq.      Notes Modes 3.6.1.1            5,6              1 thru 4                SP-1 5.6.2.20          5, 6              1 thru 4                SP-1 SURVEILLANCE FREQUENCY:
SP-1    In accordance with the Containment Leakage Rate Testing Program FREQUENCY NOTES:
None 2.2    Reference Documents 2.2.1  Bechtel report "Testing Criteria for Integrated Leakage Rate Testing of Primary Containment Structures for Nuclear Power Plants" BN-TOP-1, Rev. 1, November 1, 1972.
2.2.2  USNRC IN Notice 85-71.
2.2.3  AI-550, Infrequently Performed Tests and Evolutions 2.2.4  AI-607, Pre Job and Post Job Briefings 2.2.5  SP-1 12, Calibration of the Reactor Protection System 2.2.6  SP-132A, Engineered Safeguards Channel Calibration 2.2.7  SP-179B, Containment Leakage Test -Type B 2.2.8  SP-179C, Containment Leakage Test - Type C 2.2.9  SP-430, Containment Air Locks Seal Leakage Test 2.2.10  FPC Drawing P-304-723, Test and Drain Lines at Fuel Transfer Tubes 2.2.11  FPC Drawing 1C-308-696, Leak Rate Temperature Element Locations 2.2.12  FPC Drawing 1C-308-697, Leak Rate Humidity Element Locations 2.2.13  29 CFR 1926.804, Subchapter S, Appendix A 2.2.14  OP-417, Containment Operating Procedure 2.2.15  NDEP-0620, VT-1 and VT-3 Visual Examination of ASME Section XI, Subsection IWE Components of Nuclear Power Plants 2.2.16  EGR-NGGC-0351, Condition Monitoring of Structures SP-1 78                                  Rev. 30                                Page 5 of 207
 
3.0    PERSONNEL INDOCTRINATION 3.1    Description 3.1.1  The purpose of the R14 ILRT is to measure the total leakage through the CR3 primary containment boundary after pressurizing our 2,000,000 ft3 reactor building to 52.1 psig in accordance with 10CFR50 Appendix J, Option B.
3.1.2  To attain test pressure, a total air mass of 690,000 lbs will have been pumped into containment.
3.1.3  This air will be pumped into containment utilizing the following (estimated) equipment located outside of the protected area in the CR1/2 parking lot:
* Twenty 1,500 cfm air compressors
        "  Two 5,400 cfm desiccant air dryers
* Four 3,000 cfm desiccant air dryers
        "  One 10,000 cfm refrigerated dryer
        "  Two 60 ton chiller and associated after-coolers
        "  Two temporary 8" pipe/hose lines via 11-119 to PEN-216 and PEN-217
        "  Two 300kw Diesel Generators (twinpack) 3.1.4  The ILRT measurement system will utilize vendor supplied and installed digital instruments that enable us to accurately calculate the weight of the contained air mass and utilize statistics to determine the leak rate over time.
3.1.5  The test acceptance criteria is 75% of La (allowed leakage), or 0.1875 wt% per day of the initial mass. This equates to an allowable leakage of 53.9 Ibm/hr (approx 1/8" diameter air leak).
3.1.6  Maintaining stable plant conditions is critical to the success of this test. During testing, mass changes from pressure fluctuations, volume changes, and plant temperature changes, make it difficult to identify actual leakage trends.
3.1.7  The test duration for each of the five phases was developed based on recent industry OE and validated based on the size of CR3 containment and the number of compressors and pipe sizes.
Pressurization phase (10 hrs critical path / 7 hrs stretch)
The containment vessel is sealed and pressurized to approximately peak accident pressure via rented diesel air compressors. Past data indicates approximately ten hours to pressurize containment to the desired test pressure.
SP-1 78                                    Rev. 30                                    Page 6of 207
 
        "  Temperature stabilization phase (8 hrs critical path / 6 hrs stretch)
Once the test pressure is reached, the stabilization phase begins. Temperatures are required to stabilize for a minimum of four (4) hours although past data indicates stabilization can last up to twenty (20) hours.
* Integrated leak rate data collection phase (8 hrs critical path)
Following the temperature stabilization period, containment leak rate data is collected using installed test instrumentation for a minimum of eight (8) hours. This data collection phase may take longer if the leak rate changes.
* Leak rate verification phase (4 hrs critical path)
At the end of the test data collection phase, the leak rate verification phase begins by introducing a known leak and verifying proper operation of the test instrumentation. This phase of the test has a four (4) hour minimum requirement.
* Depressurization phase (10 hrs critical path / 6 hrs stretch)
Containment is depressurized in a controlled manner and systems are returned to their normal status. Past data indicates the depressurization phase lasts 8- 10 hours.
3.2    Definitions 3.2.1  As Found Leakage Rate: Leakage rate testing after some period of normal service conditions, performed prior to any repairs or adjustments.
As Left Leakage Rate: The leakage rate following any repairs or adjustments to the barrier being tested.
3.2.2  Containment Atmosphere Volume Weighted Average Temperature: The temperature derived from weighing each temperature sensor reading by the volume it represents.
3.2.3  La (weight %/24h). The maximum allowable Type A test leakage rate at pressure Pac.
3.2.4  Lam (weight %/24h). Estimate of leakage rate, derived as a function of the least squares slope and intercept, for the Type A test at pressure Pac obtained from testing the primary containment by simulating some of the conditions that would exist under DBA conditions (e.g. vented, drained, flooded, or pressurized).
3.2.5  Lc (weight %/24h). The composite primary containment leakage rate measured using the CILRT instruments after Lo is superimposed.
3.2.6  Lo (weight %/24h). The known leakage rate superimposed on the containment during the verification test.
3.2.7  Measurement System: The entire system from sensor to display inclusive.
3.2.8  Pac (psig or KPa) The calculated peak containment internal pressure related to the DBA 3.2.9  Upper Confidence Limit (UCL): A calculated value constructed from test data which places a statistical upper bound on the true leakage rate (%/24h).
SP-178                                    Rev. 30                                  Page 7 of 207
 
3.2.10  Verification Test: A test to confirm the capability of the Type A test method and equipment to measure La.
3.3    Responsibilities 3.3.1  Engineering Manager Responsible for the overall imriplementation of the 10CFR50 Appendix J Program.
Management designee for performing AI-550, Infrequently Performed Test and Evolution briefings.
3.3.2  Appendix J Engineer Responsible for the Type A, B, and C portions of the containment leakage rate test program. He or she will act as the final decision maker in matters concerning test conduct, deferring to Operations as required in matters of plant safety. This individual may use inputs from other plant personnel or a consultant to form decisions that meet the regulatory requirements from documents listed in the reference section. Reports to Engineering Manager.
3.3.3  Test Supervisor Acts in the capacity of the Appendix J Engineer during his or her shift during the conduct of the ILRT.
The Test Supervisor will evaluate the reported leakage and direct corrective action. No corrective action should occur without this evaluation with the exception of safety issues.
3.3.4  Operations Lead Located primarily in Control Room and responsible for interface between Control Room and ILRT Test Supervisor. Monitors plant conditions and keeps Test Table informed.
3.3.5  Local Leakage Rate Testing (LLRT) Technicians Technicians responsible for the conduct of the Type B and Type C portions of the containment leakage rate testing program.
3.3.6  Computer Technician(s)
Responsible for data reduction and analysis computer operation.
3.3.7    Equipment Technician(s)
Responsible for air compressor mechanical and operational tasks, as directed by the Test Engineer.
3.3.8  Consulting Engineer Provides general test oversight, as well as technical direction and guidance for conduct of test, including issues involving regulatory compliance, test coordination, test instrumentation, computer programs and software, troubleshooting assistance, compressors and development of test report.
3.3.9    Leak Hunt Team Responsible for locating existing leakage paths that effects the Type A test and reporting these to the Test Supervisor.
SP-1 78                                    Rev. 30                                  Page 8 of 207
 
3.3.10      Recommended Personnel The following list of recommended personnel is provided to aid the test performers in preparation and is only a guideline:
Personnel Listing (Per Shift)                Number Test Supervisor                                    1 Test Engineer                                      1 Operations Lead                                  1 Consulting Engineer                              1 Computer Technician                              1 Equipment Technician (pressurization only)        1 Leak Hunt Team                                    8 3.4        Prerequisites 3.4.1      Test Equipment required for test is addressed in:
3.4.1.1 Attachment 4, Containment Building Pressurization/Depressurization System Installation and Checkout 3.4.1.2  Attachment 5, ILRT Measurement System Installation and Checkout 3.4.1.3  Attachment 17, Gauge Installation/Removal Sheet NOTE The following tasks should be performed in support of ILRT after entering Mode 5 from power operation (sequence non-critical) unless specifically approved by the Shift Outage Director.
PRELIMINARY STEPS 3.4.2      Obtain Work Controls authorization to begin test preparation activities.
Work Controls Signature/Date 3.4.3      An organization chart describing Testing Organization, including names, phone numbers and email addresses of personnel supporting preparation, implementation, and restoration activities has been developed and communicated to project team supporting ILRT.
Inti l/
Initials/Date SP.-1l78                                    Rev. 30                                  Page 9 of 207
 
3.4.4  A "Test Desk" has been designated for control of testing activities during implementation of Section 4.0, activities and phone numbers for the center have been communicated to the SSO, Outage Management, and Work Controls.
                                                                                        /
Initials/Date 3.4.5  As part of ILRT, Test Supervisor(s) SHALL maintain an active log with CR3 Autolog and/or per Attachment 1 (Test Supervisor's Log). The Log SHALL be initiated upon commencement of performance of this procedure. The Log SHALL be used to document those activities NOT documented on existing data sheets/ attachments and should include shift turnovers, ILRT instrumentation/ computer failures, compressor failures, fuel oil orders and deliveries, recommendations for procedure enhancements, and any significant events.
                                                                                        /
Initials/Date 3.4.6  Rented portions of ILRT Pressurization System have been received and installed per Attachment 4 (Containment. Building Pressurization / Depressurization System Installation and Checkout) at Test Supervisor's direction.
                                                                                          /
Initials/Date INSTRUMENTATION & CONTROLS PREREQUISITES 3.4.7  Plant instrumentation required for conduct of ILRT (e.g. tank/sump level instrumentation) listed in Attachment 14 (Control Room Log) is calibrated per calibration program and is available for ILRT.
* _    Pressurizer level (RC-001-LIR1)
* _    Pressurizer level (RC-001-LIR3)
* _    Reactor Building Sump level (WD-222-LI)
* _    Reactor Building Sump level (WD-302-LI) 0          OTSG A level (SP-1A-LI1)
* OTSG B level (SP-1B-LI1)
* RCDT level (WD-23-1 1)
* Core Flood Tank A level (CF-2-LI1) 0          Core Flood Tank B level (CF-2-L13)
                                                                                          /
Initials/Date SP-1 78                                    Rev. 30                              Page 10 of 207
 
3.4.8  Prepare RB instrumentation and equipment for Integrated Containment Leak Rate Test by completing items listed on RB Preparation Checklist, Attachment 2, (Containment Preparation Checklist).
                                                                                        /
Initials/Date 3.4.9  Termination of ILRT sensor instrument strings inside containment have been completed per Attachment 5, (ILRT Measurement System Installation and Checkout). Circuit terminations have been "rung out" or otherwise verified to be correct.
                                                                                        /
Initials/Date 3.4.10  Modify LR system tubing to allow adequate flow for the verification test by removing LRV-63 and LRV-69 and installing a tubing jumper.
                                                                                        /
Initials/Date 3.4.11  Secure Radiation Monitors RM-G16, RM-G17 and RM-G18 and associated Radiation Monitoring System) and remove G-M tubes per Attachment 2.
                                                                                        /
Initials/Date 3.4.12  DISCONNECT H2 Analyzer Calibration (Span) Gas bottles (4)
                                                                                        /
Initials/Date 3.4.13  Installation of temporary calibrated pressure gauges is complete per Attachment 17.
                                                                                        /
Initials/Date MECHANICAL PREREQUISITES 3.4.14  The following Temporary Alterations have been performed in accordance with Attachments listed:
Maintenance support of penetration preparations described in Attachments 3 and 4, (e.g. flange removal, temporary pipe hookup, etc.).
                                                                                        /
Initials/Date SP-178                                    Rev. 30                                Page 11 of 207
 
3.4.15  Temporary pressurization header has been installed and rented pressurization equipment attached per Work Order instructions and Attachment 4 of this procedure.
                                                                                        /
Initials/Date 3.4.16  Plant mechanical equipment protection activities inside containment per Attachment 2, (Containment Preparation Checklist) are complete.
                                                                                        /
Initials/Date ELECTRICAL PREREQUISITES 3.4.17  Plant electrical equipment protection activities inside the containment per Attachment 2 are complete.
                                                                                        /
Initials/Date 3.4.18  Temporary power and lighting requirements at temporary portions of Pressurization System per Attachment 4 are met.
                                                                                        /
Initials/Date TEST SUPERVISOR PREPARATIONS 3.4.19  Verify all permits required for Test Desk and Pressurization Laydown areas have been obtained and posted.
                                                                                        /
Initials/Date 3.4.20  Temporary communications have been provided as determined by Test Supervisor.
Record numbers on Attachment 1, (Test Supervisor's Log).
                                                                                        /
Initials/Date 3.4.21  Tables, chairs, portable ventilation equipment, uninterruptible power supplies have been provided as determined by Test Supervisor.
                                                                                        /
Initials/Date SP-178                                    Rev. 30                              Page 12 of 207
 
3.4.22 Provide a listing of materials/equipment that should NOT be brought into or left in RB to Containment Coordinator and Shift Outage Director.
                                                                                        /
Initials/Date 3.4.23 VERIFY that all required Environmental Permits/Notifications associated with running the rented diesel-driven air compressors have been dispositioned.
                                                                                        /
Initials/Date 3.4.24 VERIFY installation and checkout portions of Attachment 4, (Containment Building Pressurization/Depressurization System Installation and Checkout) are complete and satisfactory.
                                                                                        /
Initials/Date 3.4.25 VERIFY that installation and calibration of instrumentation for ILRT is completed and properly documented in Attachment 5, (ILRT Measurement System Installation and Checkout).
                                                                                        /
Initials/Date 3.4.26 VERIFY "as-installed" certification of ILRT Data Management computer program is completed. Include certification package in Attachment 16, (Computer Printouts and Attachments).
                                                                                        /
Initials/Date 3.4.27 A general inspection of accessible interior and exterior surfaces of containment structures and components has been performed. Any irregularities such as cracking, peeling, delamination, corrosion, and structural deterioration SHALL be recorded and evaluated or repaired as required, prior to conduct of ILRT. Document results in Attachment 10, Containment Building Visual Inspection.
                                                                                        /
Initials/Date 3.4.28 Establish controls (signs) limiting access to periphery of containment during test at RCA Access Points. Access should be limited to personnel authorized by Test Supervisor or Work Controls.
                                                                                        /
Initials/Date SP-178                                    Rev. 30                                Page 13 of 207
 
3.4.29  Collect available local leak rate test results completed prior to ILRT. Record as-found and as-left results in Attachment 9, Containment Penetration Summary for calculations.
                                                                                          /
Initials/Date ILRT CONSULTANT PREREQUISITES 3.4.30  The test preparation portions of Attachment 5, ILRT Measurement System Installation and Checkout are complete:
                                                                                          /
Initials/Date 3.4.31  The installed ILRT Measurement System meets performance and quality specifications of Attachment 5, Section 1.0.
                                                                                          /
Initials/Date 3.4.32  Calibration and pre-test check information has been entered into Attachment 5, Section 4.0, reviewed and found acceptable. Copies of sensor calibration sheets have been included in Attachment 16, Computer Printouts and Attachments.
                                                                                          /
Initials/Date 3.4.33  ILRT Measurement System cabling has been terminated per Section 5.0 of Attachment
: 5. Documentation of cable lead landings may be on form in Section 5.0 or using standard plant form such as Enclosure 1 of CP-1 13A, Maintenance Work Performance. If WO related form is used, attach copy to Attachment 16 of this procedure.
                                                                                          /
Initials/Date 3.4.34  ILRT Measurement System dry-bulb and RH sensors have been placed in containment per Section 6.0 of Attachment 5.
                                                                                          /
Initials/Date 3.4.35  ILRT Measurement System outside containment has been installed and functionally checked per Attachments 5 and 6.
                                                                                          /
Initials/Date SP-178                                      Rev. 30                                Page 14 of 207
 
3.4.36  ILRT software program has been installed and "As-installed" Certification Package is complete. Attach certification package to Attachment 16.
                                                                                          /
Initials/Date 3.4.37  Beginning at least 24 hours prior to scheduled start of pressurization, perform a tour of containment once a shift to verify containment readiness for testing. Walk-down should catalog remaining items to be removed from containment, or items that must be protected from test pressure. Provide a list of discrepancies to Shift Outage Director and Containment Coordinator.
                                                                                          /
Initials/Date 3.4.38  Provide a set of marked-up Flow Diagrams (FD-302) to Work Controls organization illustrating test valve lineups/boundaries. Review drawings with affected coordinators.
                                                                                          /
Initials/Date 3.4.39  Review of all work orders, clearances, and temporary alterations outstanding or planned for release during ILRT window (plus 24 hours) has been completed. Review should identify existing and/or potential infringement on test boundaries, equipment operations/losses that could impact plant conditions/stability during ILRT, and ensure Work Control provisions/communication channels are adequate.
                                                                                          /
Initials/Date 3.4.40  Verify that compressors and associated air handling equipment are setup per Attachment 4, Containment Building Pressurization/Depressurization System Installation and Checkout.
                                                                                          /
Initials/Date OPERATIONS PREREQUISITES 3.4.41  Setup a Trend Report on plant computer to monitor levels in MCR Log per Attachment 14, Control Room Log every 15 minutes during test. Set plant computer to collect data on 15 minute intervals, and print reports on the hour.
                                                                                          /
Initials/Date SP-1 78                                    Rev. 30                                Page 15 of 207
 
3.4.42    Verify pressurizer level between 100 to 140 inches prior to performing ILRT to compensate for level changes during pressurization. Pressurizer level must be within indicating range during ILRT.
                                                                                              /
Initials/Date 3.4.43    Verify RCDT (WDT-5) is pumped below < 95inches. Use OP-407J, Operations of the Reactor Coolant Drain Tank as necessary.
                                                                                              /
Initials/Date 3.4.44    Plant stability is critical during the ILRT. Avoid any activity that changes containment volume during Stabilization, Hold Test and Verification Test phases.
                                                                                            /
Initials/Date NOTE For the purpose of the ILRT, Steam Generator levels are acceptable anywhere from the normal range to the 400" mark specified below.
3.4.45    The Steam Generator's (RCSG 1A / 1B) secondary side may be placed in the following ILRT Layup condition:
3.4.45.1        Steam Generators drained to just below the Main Steam lines (approximately 400" on the full range instrument).
                                                                                              /
Initials/Date 3.4.45.2 Main Steam Lines Al, A2, B1, and B2 drained.
                                                                                              /
Initials/Date 3.4.46    Reactor coolant temperature is being controlled via Decay Heat to within +/- 2&deg;F of any temperature selected by the Control Room Supervisor when pressurization starts.
                                                                                              /
Initials/Date 3.4.47    Perform the following system alignments as soon as practical prior to their related phases:
3.4.47.1      Attachment 3A, ILRT Valve Lineup Prior to Pressurization.
                                                                                              /
Initials/Date SP-1 78                                        Rev. 30                                Page 16 of 207
 
3.4.47.2    Attachment 3B, ILRT Valve Lineup Prior to Stabilization (NOT required prior to starting compressors).
                                                                                        /
Initials/Date 3.4.47.3    Attachment 3C, ILRT Special Valve Lineups. Completion REQUIRED before starting compressors.
                                                                                        /
Initials/Date 3.4.47.4    Attachment 3D, Supplementary ILRT Valve Lineups.
                                                                                        /
Initials/Date 3.4.47.5    Attachment 3E, Breaker List.
                                                                                        /
Initials/Date 3.4.48  Secure Reactor Building Cooling Units per OP-417.
                                                                                        /
Initials/Date 3.4.49  Record Decay Heat Removal Loop in operation:
                                                                                        /
Initials/Date FINAL PREPARATIONS 3.4.50  Inspect Personnel and Equipment Hatch air lock doors. Door seals and mating surfaces SHALL be clean and in acceptable condition. Close inner doors of personnel and equipment air locks. Outer doors will remain open to prevent excessive equalization time if there is a small leak into air lock.
                                                                                        /
Initials/Date 3.4.51  HPI is tagged out and the system has been bypassed to prevent actuation from an inadvertent RBIC signal during containment pressurization.
                                                                                        /
Initials/Date SP-178                                    Rev. 30                              Page 17 of 207
 
                                              . NOTE AI-504, Shutdown Guidelines requires one Reactor Building Cooling Unit to be available in Shutdown Condition 4. Due to the higher density of compressed air during ILRT conditions, the cooling unit is required to be temporarily modified with flow baffles and 129 Amp overloads for it to be considered available. Reference ED 62366.
3.4.52      Ensure one Reactor Building Cooling Unit has been temporarily modified per Attachment 2 such that it remains available per AI-504, Shutdown Guidelines. Indicate below which unit has been modified and NOTIFY the SSO which cooling unit is considered available.
AHF-1A (ES-MCC-3A2, Unit 1B)                    [] N/A AHF-1 B (ES-MCC-3B3-Unit 6AN)                    [] N/A AHF-1C (ES-MCC-3AB, Unit 1B)                    [ ] N/A SSO Notified
                                                                                            /
Initials/Date 3.4.53      All electrical equipment should be de-energized within containment, except for those services required. Refer to Attachment 3E.
                                                                                            /
Initials/Date 3.4.54      VERIFY that a review of on-going work and clearances on or around RB with Outage Work Control organization has been completed by the Test Supervisor AND ILRT Consultant, and any potential interferences with the test or breaches of testing lineups have been resolved.
                                                                                            /
Initials/Date 3.4.55      REVIEW Attachment 8, Valve Lineup Alteration Log. Verify any lineup alterations have been satisfactorily resolved.
                                                                                            /
Initials/Date 3.4.56      REVIEW Attachment 9, Containment Penetration Summary to verify actual penetration status entering ILRT is accurately reflected.
                                                                                            /
Initials/Date SP-1 78                                      Rev. 30                                  Page 18 of 207
 
3.4.57  Conduct a phase-specific briefing for Control Room personnel prior to commencement of Pressurization Phase.
                                                                                        /
Initials/Date 3.4.58  A final closeout inspection has been made by ILRT Test Supervisor or Designee to ensure:
3.4.58.1    All containment temporary equipment that contains supplies of compressed gases has been removed or vented.
                                                                                        /
Initials/Date 3.4.58.2      NO significant fire hazards have been identified in containment.
                                                                                        /
Initials/Date 3.4.58.3    Any water standing on Containment Building floors or low spots has been removed and areas left dry if practical.
                                                                                        /
Initials/Date 3.4.59  The RB sump has been pumped down to its minimum level within the indicating range of WD-222-LI.
                                                                                        /
Initials/Date 3.4.60  Align Leak Rate Test System air compressor discharge header for Pressurization per Table 1 of Attachment 4. START compressors when notified by ILRT Test Supervisor.
                                                                                        /
Initials/Date 3.4.61  Pressurization may begin prior to completion of valve alignments providing Test Supervisor has verified:
3.4.61.1    Component manipulations and/or visual verifications associated with components inside containment on Attachments 3A, 3C, 3D and 3E are complete.
                                                                                        /
Initials/Date SP-1 78                                    Rev. 30                                Page 19 of 207
 
3.4.61.2  Attachment 3C, (SYSTEM: NG, N2 to NUCLEAR EQUIPMENT) system piping venting is complete.
                                                                                        /
Initials/Date 3.4.61.3  Attachment 3C, (SYSTEM: IA, INSTRUMENT AIR) depressurizing Instrument Air header is complete.
                                                                                        /
Initials/Date 3.4.61.4  Containment portions of Attachment 2 are complete.
                                                                                        /
Initials/Date 3.4.61.5  Installation of ILRT Measurement System inside RB is complete per Attachment 5.
                                                                                        /
Initials/Date 3.4.61.6  Containment Inspection is complete in its entirety, or intent of containment inspection requirements as stated in Containment Leakage Rate Testing Program have been met.
                                                                                        /
Initials/Date 3.4.61.7  Test Supervisor has reviewed Attachment 8, Valve Lineup Alteration Log to ensure that all components inside containment are in their Test Position, or have been satisfactorily dispositioned.
                                                                                        /
Initials/Date 3.4.61.8  Review of all outstanding work orders, clearances and temporary alterations have been completed at least to the extent that Test Supervisor, Outage Management or Operations interface are satisfied that NO obstacles to closing out of containment/performing the test exist.
                                                                                        /
Initials/Date 3.4.62 Final walkdown/closeout inspection of containment has been satisfactorily completed.
                                                                                        /
Initials/Date SP-178                                  Rev. 30                                  Page 20 of 207
 
3.4.63  Notify Chemistry to take RB air sample e.g. RM-A6 prior to pressurization. This sample is to be used to prepare release permit for the verification (imposed) leak test and depressurizing containment after ILRT.
                                                                                        /
Initials/Date 3.4.64  Establish communications between ILRT Test Desk, Main Control Room, and air compressors.
                                                                                        /
Initials/Date 3.4.65  Verify containment temporary power/lighting has been isolated.
                                                                                        /
Initials/Date 3.4.66  Verify all personnel are clear of the RB. Evacuate all personnel from RB by making the following announcement twice:
        "ATTENTION ALL PERSONNEL IN THE REACTOR BUILDING ATTENTION ALL PERSONNEL IN THE REACTOR BUILDING, ILRT PREPARATIONS ARE COMPLETE. ALL PERSONNEL EXIT THE CONTAINMENT AT THIS TIME."
                                                                                        /
Initials/Date 3.4.67  Prior to RB pressurization, have Operations Department sound the RB evacuation alarm, Health Physics review all sign-in sheets and Security review computer logs to verify reactor containment has been evacuated by all personnel. Have each department Initial/Date below:
INITIALS / DATE Operation Department Sound Evacuation Alarm Health Physics Dept. Sign-in Sheet ./ Computer Logs Verification Security Review of Containment Access Computer Logs 3.4.68  Close out the Containment Building as follows:
3.4.68.1 Equipment Hatch Resilient Seals
: a. Verify RB Equipment Hatch is installed.
                                                                                        /
Initials/Date SP-1 78                                    Rev. 30                              Page 21 of 207
: b. Verify RB Equipment Hatch seal test (SP-179B, Pen-222) following installation was acceptable.
                                                                                            /
Initials/Date 3.4.68.2 Equipment Hatch Air Lock.
: a. Verify outer door OPEN I/
Initials/Date
: b. Close and lock inner door of Airlock.
                                                                                              /
Initials/Date 3.4.68.3 Personnel Airlock.
: a. Verify outer door OPEN.
Initials/Date
: b. Close and lock inner door of Airlock.
                                                                                            /
Initials/Date NOTE Seal testing of airlock doors can occur as soon as the door is secured to traffic/locked (e.g., the Equipment Hatch Lock). Testing of the Personnel Hatch Door Seals can occur 12-18 hours earlier at the ILRT Supervisor's direction, and need not be repeated if the pre-closing inspection of the seals/seating surface shows no signs of damage. IF there is any reason to suspect the performance of the door seals, THEN perform the leak test, 3.4.69      SP-430, Containment Airlock Seal Leakage Test has been successfully performed for the inner door seal.
                                                                                            /
Initials/Date SP-1 78                                        Rev. 30                                Page 22 of 207
 
3.5      Limits and Precautions 3.5.1  The Containment Integrated Leak Rate Test is considered an Infrequently Performed Test or Evolution (IPTE). This test will require additional oversight to promote event free operation through a heightened level of awareness. Shift briefings must be conducted prior to actual test commencement in accordance with AI-550, Infrequently Performed Tests and Evolutions.
3.5.2    For performance of this critical infrequently performed test the Manager, Engineering or designee has overall responsibility for the oversight of this test, including briefing the operating and test personnel with management expectations prior to performance of the infrequently performed test.
3.5.3  Containment isolation valves that will be tested by the ILRT shall be closed using the normal mode of force without any preliminary exercising or adjustments. (No manual tightening of automatic valves after closure by normal means.) Alternate means of closure may be used provided they are documented and are equivalent to normal means. This precaution does not apply to valves in penetrations for which a Type C penalty is being applied to the ILRT results.
3.5.4    Ifthe test results exceed the performance criteria (La) as defined in TS, those exceedances must be assessed for Emergency Notification System reporting under 10 CFR 50.72.
3.5.5  Work to be performed in Auxiliary or Intermediate Building during the ILRT must be coordinated through the Shift Outage Director.
3.5.6  No instrument or logic tests that could affect the ILRT or supporting systems should be performed during the ILRT. If required, the Shift Outage Director and the Test Supervisor shall review the work activity to determine if it could affect the ILRT test.
3.5.7  Containment Building pressure is to be increased or decreased only at the direction of the ILRT Test Supervisor.
3.5.8  Test pressure during the Stabilization and ILRT phases must equal or exceed 0.96 Pa
(_>52.1 psig). Containment pressure shall NOT exceed Pd (55.0 psig) during any test phase. Pressure may drop below this limit during the Verification Test phase.
3.5.9  The pressurization/depressurization rate shall be regulated to limit pressure changes to not more than 15 psig/hr. This is to prevent a large differential pressure across RB components such as insulation, electrical box covers, light bulbs, paint, etc.
3.5.10  During pressurization of the containment, periodic surveillance of the containment and penetrations should be maintained. Any unusual conditions noted SHALL be immediately reported to the ILRT Test Supervisor. A determination of the condition will then be made.
SP-1 78                                    Rev. 30                                  Page 23 of 207
 
3.5.11  NO leakage path SHALL be isolated without the approval of the ILRT Test Supervisor.
Prior to or during the test any leaks which are repaired or valve lineups which are altered SHALL be listed in Attachment 7, (Test Exceptions Log). Any leakage penalties for the above will be documented on Attachment 9, (Containment Penetration Summary). Additional guidance is provided in Section 2.0 of Attachment 11.
3.5.12  During pressurization for the ILRT the outer airlock doors on the Personnel Hatch (RAX-1) and Equipment Hatch (RAX-2) are left open. If leakage checks of the inner doors indicates excessive leakage into the airlocks it is permissible to accelerate airlock pressurization by closing the outer doors and pressurizing the airlock with air as directed in SP-181, Containment Air Lock Test to within 0.5 psig below the planned final test pressure, accounting for gauge accuracy per Section 6.0 of Attachment 11, CONTINGENCIES. If pressurization of the airlock is chosen, leak check the outer doors and outboard boundary components using a soap bubble test solution such as Leaktec. Iftight, isolate and remove air source once pressure has been reached. If excessive leakage is observed proceed per the guidance in Step 3.5.13.
3.5.13  EXCESSIVE LEAKAGE:
Leakage discovered during leak searches or routine operations while containment is at pressure must be reported to ILRT Test Supervisor for evaluation, AND unless leakage is a personnel safety hazard, it must NOT be adjusted or isolated without specific direction from ILRT Test Supervisor. ANY adjustment to a leaking containment boundary may result in test failure, therefore when leakage is identified, ILRT Test Supervisor will consider the options listed on Attachment 11.
3.5.14  UNEXPECTED RESPONSE:
ILRT is a complex evolution involving temporary test equipment and several plant systems. Unexpected responses/alarms/plant indications can include sensor failure or erratic behavior; fire/smoke alarms, misleading indications of excessive leakage; loss of or erratic level indication; unplanned rapid depressurization through a failed component, or failure to pressurize due to valve/flange alignment problems. IF any of these conditions are encountered during the test, THEN establish the Safe Condition for the test mode and assess plant/test conditions. Refer to Attachment 11.
3.5.15  SAFE CONDITIONS & TEST ABORT CRITERIA:
Operations, or ILRT Test Supervisor may decide to abort ILRT if plant conditions, test conditions, or test results warrant. Attachment 11, Contingencies addresses actions for various phases of the test, safe conditions for each, and appropriate abort plans.
3.5.16  Maintain the Reactor Coolant System level and temperature stable. Containment leakage rate results are sensitive to factors which change the net free volume of the containment. Changes in level and temperature may affect containment leakage rates during critical portions of the ILRT, impacting results and/or test schedule.
3.5.17  The ILRT Test Supervisor shall be notified of any RB sump high level alarms to assist in analysis of leakage sources.
SP-1 78                                    Rev. 30                                Page 24 of 207
 
3.5.18  Communications must be established between key ILRT locations prior to the start of pressurization, and shall be available between the ILRT Test Desk and the Control Room at all times during the test.
3.5.19  Preparation for ILRT may begin prior to the plant entering Mode 5. Containment integrity SHALL be maintained in Modes 1, 2, 3 and 4 in accordance with applicable portions of Technical Specification 3.6.
3.5.20  Do not leave any portion of the secondary system inside containment vented to the containment atmosphere.
3.5.21  Do NOT use any jumper leads without insulated connections.
3.5.22  The ILRT Test Supervisor SHALL verify prior to the test that there is NO significant fire hazard in containment.
3.5.23  Temperature limits for Reactor Containment atmosphere SHALL NOT be exceeded.
Limits are > 60'F and < 130 0F.
3.5.24  Test Tags may be used on plant equipment. These tags are used to indicate that a component has been aligned to a certain configuration in support of ILRT.
3.5.25  Individual steps may be omitted or performed out of order at discretion of ILRT Test Supervisor, marked N/A, and explained in Attachment 7, Test Exception Log.
3.5.26  At the direction of the Operations Lead, valve alignment may be performed out of order. Any deviation SHALL be documented on Attachment 8.
3.5.27  CR3 Safety Representative will specify approved hearing protection in test areas (adjacent to the air compressors, air charging piping, pressurization lines, and depressurization lines) during pressurization AND depressurization operations.
3.5.28  NO data point is to be rejected on a purely statistical basis. Apparent outliers will be investigated for physical or measurement system problems. Individual sensor performance graphs and sensor deviation/failure criteria, provided by ILRT computer program, will be used to evaluate sensor performance and to provide basis for sensor deletion. Raw data for deleted sensors will continue to be recorded if possible, but NOT used, throughout the test.
3.5.29  Containment entry is permissible when containment is pressurized per OP-417, Containment Operating Procedure.
3.5.30  IF a containment entry is required prior to 12 psig, THEN an EMT SHALL be available. NO personnel SHALL be allowed to enter containment above 12 psig without permission of the Plant General Manager.
IF entries at pressure are required, THEN Safety SHALL be contacted to ensure compliance with requirements of OSHA regulations (29CFR1926.804, Subpart S, Appendix A).
SP-1 78                                  Rev. 30                                Page 25 of 207
 
3.6    Acceptance Criteria 3.6.1  As-Found Type A test leakage rate must be less than the acceptance criterion of 1.0 La given in Plant Technical Specifications AND As-Left Type A test results at the 95% UCL are less than or equal to 75%La.
3.6.2  Test results exceeding 0.25 wt%/day (1.0 La) must be referred to the Engineering Manager for assessment under the Emergency Notification System reporting requirements of 10CFR 50.72.
3.7    Setpoints None SP-1 78                                  Rev. 30                              Page 26 of 207
 
4.0    INSTRUCTIONS 4.1    Initial Conditions 4.1.1  Plant is shutdown in Mode 5.
                                                                                      /
Initials/Date 4.1.2  Perform an IPTE briefing in accordance with AI-550, Infrequently Performed Tests and Evolutions. IPTE briefing has been completed for each new shift.
Shift                  IPTE or Designee/Date Shift                  IPTE or Designee/Date Shift                  IPTE or Designee/Date Shift                  IPTE or Designee/Date 4.1.3  OBTAIN permission from SSO or Designee to perform test.
                                            /
SSO/Designee                      /    Date 4.1.4  The Test Supervisor has verified all Prerequisites and Precautions and Limitations have been reviewed and/or satisfactorily completed.
                                            /
Test Supervisor                      /    Date 4.2    Pressurization of Reactor Containment 4.2.1  Data Collection:
4.2.1.1 Record ambient pressure at the start of pressurization:
Ambient pressure =          __  psia Gauge serial #:              Cal due date:
                                                                                        /
Initials/Date SP-1 78                                Rev.' 30                                Page. 27 of 207
 
4.2.1.2 Record initial pressure on test gauges listed on Attachment 17 and Attachment 18. Record pressure readings from test gauges installed on plant equipment in Attachment 17 every thirty minutes until containment reaches 12 psig, at one hour intervals thereafter until end of pressurization, and stabilization, or as directed by Test Supervisor.
                                                                                          /
Initials/Date 4.2.1.3 Start recording containment atmospheric data at 15 minute intervals using the ILRT Measurement System.
                                                                                          /
Initials/Date 4.2.1.4 Verify Trend Report on plant computer setup to monitor levels in, Attachment 14 (Control Room Log) is running. Data should be recorded at 15 minute intervals, printed hourly.
                                                                                          /
Initials/Date 4.2.1.5  Record Initial Water Levels on Attachment 14, (Control Room Log).
                                                                                          /
Initials/Date 4.2.2  Announce the following 3 times over plant page.
        "ATTENTION ALL PERSONNEL, ATTENTION ALL PERSONNEL, REACTOR BUILDING PRESSURIZATION IS ABOUT TO COMMENCE. ALL NON-ESSENTIAL PERSONNEL SHALL STAND CLEAR OF REACTOR BUILDING AREAS ASSOCIATED WITH THE INTEGRATED LEAK RATE TEST."
                                                                                          /
Initials/Date SP-1 78                                    Rev. 30                                  Page 28 of 207
 
4.2.3      Initiate Pressurization by opening Penetration 216 and 217 test valves and start pressurization. Continue to pressurize until containment air pressure reaches 54.0 psig + 1.0, - 0 psig (the target pressure is 54.5). Maximum pressurization rate should NOT exceed 15 psi per hour.
4.2.3.1    Pen-216 (8")
* reOPEN PEN216-TV3 (compressor isolation valve)
* __CLOSE PEN216-TV4 (muffler isolation valve)
* OPEN PEN216-TV1 (penetration isolation valve)
* OPEN PEN216-TV2 (throttle valve) as necessary to maintain a maximum pressurization rate NOT to exceed 15 psi/hr
                                                                                            /
Initials/Date 4.2.3.2    Pen-217 (8")
0      OPEN PEN217-TV7 (compressor isolation valve)
* CLOSE PEN217-TV8 (muffler isolation valve)
* OPEN PEN217-TV5 (penetration isolation valve)
* OPEN PEN217-TV6 (throttle valve) as necessary to maintain a maximum pressurization rate not to exceed 15 psi/hr
                                                                                            /
Initials/Date NOTE Test pressure SHALL NOT fall below 52.1 psig or exceed 55 psig at anytime during ILRT.
Test pressure may fall below 52.1 psig during verification test.
4.2.3.3 Maintain moisture and oil content as low as possible when pressurizing Reactor Containment Building.
                                                                                            /
Initials/Date SP-1 78                                        Rev. 30                              Page 29 of 207
 
4.2.3.4 Containment inlet air temperature should be monitored during pressurization phase of test to ensure containment weighted average temperature is above 601F and below 130&deg;F.
                                                                                              /
Initials/Date NOTE Report any apparent leakage to ILRT Test Supervisor. DO NOT isolate or adjust any leakage found during leak checks. Excessive leakage is to be dispositioned per Attachment 11.
4.2.3.5 Inspect containment boundary for leakage at containment pressures of approximately 20 psig and 40 psig.
                                                                                              /
Initials/Date 4.2.4      Notify Chemistry that this is the final opportunity to obtain an air sample from containment prior to end of pressurization phase. This sample may be used to prepare a release permit for depressurizing containment after ILRT. Following pressurization, samples will not be allowed until depressurization phase of ILRT.
                                                                                              /
Initials/Date NOTE Evolutions such as changing tank/sump and pressurizer levels can destabilize the containment atmosphere and put the ILRT schedule at risk. It is highly desirable to make any such adjustments prior to commencing data taking in the Stabilization Phase.
4.2.5      As the containment nears test pressure assess plant conditions, e.g. pressurizer and/or sump levels, pump sumps or make additions to the RCS as required prior to entering the stabilization phase.
                                                                                              /
Initials/Date 4.2.6      At equal to or greater than 40 psig, verify adequate flow can be obtained through each verification test flowmeter and check connections for leakage. IF required minimum flowrate cannot be obtained individually or in parallel, refer to Attachment 11, Contingencies, Section 7.0.
                                                                                              /
Initials/Date 4.2.7      The ILRT Test Supervisor will direct compressor operator to isolate compressors in groups as pressure exceeds 45 psig. The number of compressors secured and isolated at a given time is at the discretion of the ILRT Test Supervisor.
                                                                                              /
Initials/Date SP-1 78                                      Rev. 30                                  Page 30 of 207
 
NOTE At 50 psig, alert Operations that an Operator will need to be stationed to CLOSE the ILRT test isolation valves as soon as test pressure is reached. The ILRT Test Supervisor may direct additional test valves to be repositioned.
4.2.8      WHEN desired pressure is achieved, THEN:
4.2.8.1 Isolate containment by closing the two (2) eight-inch isolation valves upstream of penetrations 216 and 217.
0        CLOSE PEN216-TV1 (penetration isolation valve) 0        CLOSE PEN217-TV5 (penetration isolation valve)
                                                                                              /
Initials/Date 4.2.8.2  Shutdown remaining compressors.
                                                                                              /
Initials/Date 4.2.8.3 Isolate compressors at compressor outlets and pressurization system manifold
                                                                                              /
Initials/Date 4.2.8.4  Open a vent on compressor manifold to vent pressurization lines.
                                                                                              /
Initials/Date NOTE At any time after it has been verified that NO leakage is present at the two 8" isolation valves at Penetrations 216 and 217, the ILRT Test Supervisor, with the concurrence of the ILRT Consultant, may direct partial disassembly of the Pressurization System outside the Protected Area fence.
4.2.8.5 After lines are depressurized, THEN check vent for evidence of leakage past the two (2) closed eight-inch isolation valves at penetrations 216 and 217.
                                                                                              /
Initials/Date SP-1 78                                      Rev. 30                                  Page 31 of 207
 
NOTE ILRT Data Management computer program may be placed in Stabilization Mode while administrative review of remaining sections of this step is completed.
4.2.9      IF pressurization was begun prior to completion of all valve alignments, THEN verify the following:
4.2.9.1 Component manipulations/visual verifications associated with components outside containment in Attachment 38, Lineup Prior to Stabilization are complete.
                                                                                            /
Initials/Date 4.2.9.2 ILRT Test Supervisor and ILRT Consultant has reviewed Attachment 8, (Valve Lineup Alteration Log) to ensure that all components listed are in their "TEST POSITION". Any unresolved component positions must be listed as Test Exceptions in Attachment 7, and the impact on penetration status listed in Attachment 9, (Containment Penetration Summary) must be assessed.
                                                                                            /
Initials/Date 4.2.10      RECORD lowest reading ILRT pressure gauge on line 1 and outside atmospheric pressure on line 2 below. Subtract line 2 from line 1. Enter the result on line 3. Verify Line 3 value is greater than 52.1 psig.
(1) Lowest Reading ILRT Pressure Gauge                      psia (2) Outside Atmospheric Pressure                              psia (1)                - (2)                = (3)                psig (3) Containment Gauge Pressure                                psig Line (3) value    __    > 52.10 psig
                                                                                            /
Initials/Date SP-1 78                                      Rev. 30                                Page 32 of 207
 
4.3    Stabilization Phase 4.3.1  Data Collection:
4.3.1.1  Record ambient pressure at the start of stabilization:
Ambient pressure              psia Gauge serial #:              Cal due date:
                                                                                        /
Initials/Date 4.3.1.2 Record the Start of the Stabilization Phase:
Time (24 hr clock)                  Date      /
                                                                                        /
Initials/Date 4.3.1.3 Record pressure readings from test gauges installed on plant equipment in Attachment 17 every hour until the end of stabilization, or as directed by Test Supervisor.
                                                                                        /
Initials/Date 4.3.1.4 Continue recording containment atmospheric data at 15 minute intervals using ILRT Measurement System.
                                                                                        /
Initials/Date 4.3.1.5 Verify Trend Report on plant computer setup to monitor levels in Attachment 14 is still running.
                                                                                        /
Initials/Date 4.3.2  Allow containment atmosphere to stabilize for a minimum of four hours after time recorded in step 4.3.1.2 THEN record time and date.
Time (24 hr clock)              Date        /    /
                                                                                        /
Initials/Date SP-1 78                                  Rev. 30                                  Page 33 of 207
 
NOTE Stabilization criteria for performing ILRTs under both the BN-TOP-1 and ANSI 56.8-1994 methodologies are included. Leakage stabilization criteria of ANSI 56.8-1994 is more difficult to meet. At least one method's criteria must be met in order to enter Hold Test Phase. Both criteria should be met before starting Type A Test in order to provide the most options during Hold Test Phase. Note that failing to meet a methodology's stabilization criteria may preclude its use as a means to perform ILRT.
4.3.3        During pressure stabilization period, check for leaks at RB Pressure Sensing Cabinets 3A1, 3A2, 3A3, 3A4, 3B1, 3B2, and 3B3
                                                                                                    /
Initials/Date 4.3.4        Prior to start of Type A Test, verify the following stabilization criteria for containment atmosphere are met. Stabilization occurs when:
4.3.4.1    BN-TOP-1
: a. Rate of change of average temperature is less than 1.0&deg;F/Hour averaged over the last two hours. (BN-TOP-1 requirement).
OR
: b. Rate of change of temperature changes less than 0.5&deg;F/Hour/Hour averaged over the last two hours. (BN-TOP-1 requirement).
: c. BN-TOP-1 stabilization criteria met. Attach a screen-print from the Stabilization Phase screen of ILRT Data Management Program stating criteria has been met to Attachment 16, (Computer Printouts and Attachments).
                                                                                                    /
Initials/Date.
SP-1 78                                        Rev. 30                                    Page 34 of 207
 
NOTE Ll h = estimate of leakage rate, derived from least squares slope and intercept using mass data over the last hour (in % wt/day).
L2h = estimate of leakage rate, derived from least squares slope and intercept using mass data over the last two hours (in % wt/day).
4.3.4.2    ANSI/ANS 56.8-1994
: a. Primary containment atmosphere is assumed to be stabilized for Type A test purposes when the following criteria are simultaneously met (ANSI 56.8-1994):
Criterion (1)
The absolute value of difference between L2h and Llh SHALL be less than or equal to 0.25La.
Llh =
L2h =
(L2h)  -  _    (Llh) =          < (0.0625% wt/day)
Criterion (2)
Ll h SHALL be greater than or equal to zero and SHALL be less than La.
NOTE Per ANSI/ANS 56.8-1994, paragraph 5.6, If one or more leakage pathways require isolation, repair or adjustment in order to meet criterion (2), criterion (1) need NOT be re-verified provided this criterion was met prior to time of isolation, repair, or adjustment.
The change in Ll h should be demonstrated to be a direct result of this isolation, repair, or adjustment.
: b.          ANSI/ANS 56.8-1994 leakage stabilization criteria met.
Attach a screen-print from Stabilization Phase screen of ILRT Data Management Program stating criteria has been met to Attachment 16, (Computer Printouts and Attachments).
                                                                                                /
Initials/Date 4.3.5        ILRT Test Supervisor SHALL judge if containment is stabilized and declare start of test based on a review of temperature vs. time, pressure vs. time graphs, available mass change and leakage data, as well as meeting criteria of 4.3.1 and 4.3.2 or 4.3.3.
RECORD below the number of hours of stabilization, the time and date of the end of stabilization and the time and date of the start of the ILRT.
SP-1 78                                          Rev. 30                                  Page 35 of 207
 
Stabilization Declared:
Time / Date No. of Hours for Stabilization:
Hours Start of ILRT Hold Test Phase:
Time / Date I/
Initials/Date 4.4        Hold Test Phase NOTE Perform ILRT calculations in accordance with Section 4.4.4 for BN-TOP-1 test or Section 4.4.5 for an ANSI/ANS 56.8-1994 test.
4.4.1      Data Collection:
Record ambient pressure at the start of the Hold Test:
Ambient pressure            psia Gauge serial #:            Cal due date:
                                                                                          /
Initials/Date 4.4.1.1 IF there has been NO indication of rising pressure on any of the test gauges, THEN discontinue recording the pressure on test gauges listed on Attachment 17.
                                                                                          /D    :
Initials/Date SP-178                                      Rev. 30                                Page 36 of 207
 
4.4.1.2 Continue recording containment atmospheric data at 15 minute intervals using ILRT Measurement System.
                                                                                            /
Initials/Date 4.4.1.3 Verify Trend Report on plant computer setup to monitor levels in Attachment 14, is running.
                                                                                            /
Initials/Date 4.4.1.4    Record Initial Water Levels on Attachment 14, (Control Room Log).
                                                                                            /
Initials/Date 4.4.2        Monitor performance of temperature, humidity, and pressure sensors during conduct of test. Delete any non-operable sensors from calculation and modify weighing factors, if necessary per Attachment 5 Section 3.0. Document reasons for sensor deletion and volume fraction reassignment in the test log, Attachment 1. Record new weighing factors in table in Section 6.0 of Attachment 5.
                                                                                            /
Initials/Date NOTE Notify Nuclear Chemistry Group and Operations at least two hours prior to starting the Verification test.
4.4.3      VERIFY that the Nuclear Chemistry Group has generated a release permit.
                                                  ~/
Initials/Date 4.4.4        BN-TOP-1 TEST (per Bechtel Topical Report BN-TOP-1, Rev.1)
In order to perform a BN-TOP-1 test, the following criteria SHALL be met.
IF a BN-TOP-1 test is NOT performed, THEN place a N/A in space provided below:
BN-TOP-1 Test
                                                                                            /
Initials/Date SP-1 78                                        Rev. 30                              Page 37 of 207
 
4.4.4.1 After a minimum of six (6) hours of acceptable data is obtained, determine if "Preliminary as Left" leakage rate, including known B & C additions from Attachment 15 using Total Time 95% Upper Confidence Level (UCL) as reported by ILRT computer program is < 0.075% wt/day.
                                                                                              /
Initials/Date 4.4.4.2 BN-TOP-1 based on total-time calculations indicates that the magnitude of the calculated leakage rate is tending to stabilize at a value less than 75% of the maximum allowable leakage rate.
                                                                                              /
Initials/Date NOTE The magnitude of calculated leakage rate may be increasing slightly as it tends to stabilize. In this case, the average rate of increase of the calculated leakage rate SHALL be determined from accumulated data over the last five (5) hours or last twenty (20) data points, which ever provides more points. Using this average rate, the calculated leakage rate is then linearly extrapolated to the 24th hour data point. This extrapolated value of the calculated leakage rate must be less than 75% of the maximum allowable leakage rate.
4.4.4.3 The mean of measure leak rates based on Total Time Calculations over the last five (5) hours of test or last twenty (20) data points, whichever provides the most data, SHALL be less than 75% of the maximum allowable leak rate.
                                                                                              /
Initials/Date 4.4.4.4 The end of test upper 95% confidence limit for calculated leak rate based on Total Time calculations, plus all known additions SHALL be less than 75% of maximum allowable leak rate.
                                                                                              /
Initials/Date 4.4.4.5 Data SHALL be recorded at approximately equal intervals and in NO case at intervals greater than one (1) hour.
                                                                                              /
Initials/Date SPA178                                        Rev. 30                                  Page 38 of 207
 
4.4.4.6 At least twenty (20) data points SHALL be provided for proper statistical analysis.
                                                                                              /
Initials/Date 4.4.4.7  The minimum test duration is six (6) hours.
                                                                                              /
Initials/Date 4.4.4.8 The following minimum number of sensors was working properly at end of the test:
: a. At least twenty (20) drybulb temperature sensors
: b. At least four (4) relative humidity sensors
: c. At least one (1) pressure gauge
                                                                                              /
Initials/Date NOTE Known Type B and C penalties and leakage savings must be taken into account and added to the Upper Confidence Level (UCL) Leakage Rate. If additional penalties may be required due to leakage paths isolated during the test, an adequate margin between the UCL Leakage Rate and the acceptance criteria should be maintained to accommodate the additional values. If Step 4.4.4.10c is below the acceptance criteria, the verification test may be started prior to completing all of the calculations required by Attachment 15.
4.4.4.9        Record actual duration of ILRT:
duration in hours
                                                                                              /
Initials/Date SP-1 78                                      Rev. 30                                  Page 39 of 207
 
4.4.4.10        Calculate leakage rates via ILRT computer program. Record ILRT leakage below:
: a.        Leakage Measured (Lam)                wt%/day
: b.        Leakage Measured at 95% UCL      __    wt%/day
: c.        Preliminary As-Left Leakage            wt%/day Consultant        /    Date Test Supervisor Verification /      Date 4.4.5  ANSI/ANS 56.8-1994 TEST PERFORM ILRT measurements using mass point data analysis method until data indicates the following criteria is met.
IF an ANSI/ANS 56.8-1994 test is NOT performed, THEN place N/A in space provided below.
ANSI/ANS 56.8-1994 Test 4.4.5.1 End of test upper 95% confidence limit for calculated leak rate based on mass point data analysis, plus all known additions SHALL be less than 75% of maximum allowable leak rate.
                                                                                          /
Initials/Date 4.4.5.2 Data SHALL be recorded at approximately equal intervals and in NO case at intervals greater than one (1) hour.
                                                                                          /
Initials/Date 4.4.5.3 At least thirty (30) data points SHALL be provided for proper statistical analysis.
                                                                                          /
Initials/Date SP-1 78                                    Rev. 30                              Page 40 of 207
 
4.4.5.4 Minimum test duration is eight (8) hours. IF Termination Criteria are NOT met, THEN:
: a.        Continue the test, until the criteria is met,
                                                                                          /
Initials/Date OR
: b.        Consider reporting the Total Time results if the criteria for a BN-TOP-1 test can be met.
                                                                                        /
Initials/Date
: c.        Consider restarting Hold Test if adequate pressure and stable conditions exist.
                                                                                        /
Initials/Date
: d.        IF test results appear unacceptable due to excessive leakage, THEN refer to Step 3.0 of Attachment 11.
                                                                                        /
Initials/Date 4.4.5.5 At end of 8 hours verify the two termination limits of ANSI 56.8-1994 have been met as follows:
: a.        Limit on curvature met by meeting any one of three inequalities described by ANSI 56.8-1994, as calculated by ILRT computer program (FTEST<1 or CP>0 or Quad<1).
                                                                                        /
Initials/Date
: b.        Limit on data scatter met (COD>1).
                                                                                        /
Initials/Date
: c.        Limits on curvature and data scatter above 4.4.5.5a and 4.4.5.5b were met for at least the last hour or the last four consecutive data sets (whichever is longer).
                                                                                        /
Initials/Date SP-1 78                                Rev. 30                                  Page 41 of 207
: d.        Attach ILRT computer program printout stating Termination Criteria has been met AND Termination Criteria Report printout to ATTACHMENT 16 of this procedure.
                                                                                              /
Initials/Date 4.4.5.6 The following minimum number of sensors were working properly.at end of test:
: a.        At least one (1) pressure gauge
: b.        At least ten (10) drybulb temperature sensors C.        At least three (3) relative humidity sensors
                                                                                              /
Initials/Date NOTE Known Type B and C penalties and leakage savings must be taken into account and added to the Upper Confidence Level (UCL) Leakage Rate. IF additional penalties may be required due to leakage paths isolated during the test, THEN an adequate margin between UCL Leakage Rate and acceptance criteria should be maintained to accommodate additional values. IF Step 4.4.5.7c is below acceptance criteria, THEN verification test may be started prior to completing all calculations required by Attachment 15.
4.4.5.7 Calculate leakage rates via ILRT computer program. Record ILRT leakage below:
: a.        Leakage Measured (Lam)                    wt%/day
: b.        Leakage Measured at 95% UCL          __  wt%/day C.        Preliminary As-Left Leakage                wt%/day Consultant      /    Date Test Supervisor Verification /      Date 4.4.5.8  Record end-of-test Water Levels on Attachment 14, (Control Room Log).
I      /
Initials/Date SP-1 78                                      Rev. 30                                  Page 42 of 207
 
NOTE If a preliminary assessment of test additions/corrections was made prior to ending the ILRT and these additions were determined to have minimal impact on test acceptability, Step 4.5 may be completed after the superimposed leak is imposed and the Verification Test has begun.
4.5          Verification Test 4.5.1        Data collection:
4.5.1.1 Record time and date for start of Verification Test:
Time (24 hr clock):              Date:
                                                                                            /
Initials/Date 4.5.1.2 Record Verification Test Phase Initial Water Levels on Attachment 14, (Control Room Log).
                                                                                            /
Initials/Date 4.5.1.3 Verify Trend Report on plant computer setup to monitor levels in, Attachment 14 is still running.
                                                                                            /
Initials/Date 4.5.1.4 Start recording containment atmospheric data in Verification Test Mode of ILRT Data Management Program at 15 minute intervals using ILRT Measurement System.
                                                                                            /
Initials/Date 4.5.1.5 Continue data acquisition after completion of ILRT through completion of Verification Test.
                                                                                            /
Initials/Date SP-1 78                                      Rev. 30                                Page 43 of 207
 
4.5.2  OPEN the following valves:
4.5.2.1  LRV-45
                                                                                      /
Initials/Date 4.5.2.2  LRV-46
                                                                                      /
Initials/Date 4.5.2.3  LRV-64 (N/A if not chosen)
                                                                                      /
Initials/Date 4.5.2.4  LRV-65 (N/A if not chosen)
                                                                                      /
Initials/Date 4.5.3  Throttle valve LRV-64 or LRV-65 to establish a flow (Lo) through chosen rotameter of approximately 16.0 scfm (acceptable band is 12.0 - 20.0 scfm). Record rotameter readings at approximately equal intervals NOT to exceed one (1) hour in Attachment 12.
                                                                                      /
Initials/Date 4.5.3.1 IF a rotometer is used to measure imposed leak, THEN correct its reading to actual conditions in Attachment 12;.
Rotameter M&TE Number:
Corrected Flow value:              scfm
                                                                                    /
Initials/Date 4.5.3.2  Enter corrected flow value into ILRT computer program:
Value entered:              scfm
                                                                                      /
Initials/Date SP-1 78                                  Rev. 30                              Page 44 of 207
 
4.5.4  Continue the verification test until the following criteria are met:
4.5.4.1 IF ILRT was performed per BN-TOP-1, Rev.1 (N/A if ILRT per ANSI 56.8-1994), THEN perform the following:
: a. IF a short duration test was performed, THEN allow leak to stabilize for a period NOT to exceed one (1) hour from end of ILRT. Data acquisition is to continue throughout stabilization period. IF a 24 hour test or an ILRT under ANSI 56.8-1994 was performed, THEN a leak stabilization period is NOT required.
                                                                                            /
Initials/Date
: b. Verification test SHALL continue for one half the duration of the ILRT per BN-TOP-1, Rev. 1. Record duration:
Obtain duration of ILRT from Step 4.4.3.9:
ILRT Duration:              (hrs)
Divide ILRT duration by 2.
                                    - 2=                        (hrs)
ILRT duration
                                                                                            /
Initials/Date
: c. Determine duration of Verification Test:
Current Time/Date:                    /
Subtract current time from start time recorded in Step 4.5.1.1:
Current time                Time from 4.5.1.1        Duration IF value of (c) [Verification Test Duration] is greater than (b) [1/2 ILRT duration], THEN Verification test time is sufficient.
(c)          hrs. > (b)                hrs.
                                                                                            /
Initials/Date SP-1 78                                  Rev. 30                                  Page 45 of 207
: d. Composite Leakage Rate (Lc), as measured by ILRT computer using Total Time data analysis technique results, SHALL satisfy the following (show calculations on Attachment 12):
(LO + Lam - 0.25 La)<5 Lc < (Lo + Lam+ 0.25. La)
_____        _        _____<()
Lower Limit        Lc    Upper Limit
                                                                                          /
Initials/Date 4.5.4.2 IF ILRT was performed per ANSI 56.8-1994 (N/A if ILRT per BN-TOP-1),
THEN:
: a. Verification test SHALL continue for a minimum of four (4) hours. Record duration:
Verification Test Duration:        (hrs)
                                                                                          /
Initials/Date
: b. Composite Leakage Rate (Lc), as measured by ILRT computer using Mass Point data analysis technique results, SHALL satisfy the following (show calculations on Attachment 12):
(LO + Lam - 0.25 La)<5 Lc < (Lo + Lam+ 0.25. La)
Lower Limit        Lc          Upper Limit
                                                                                          /
Initials/Date
: c. Lc value was within criteria above for the final hour or last four data points (whichever is longer).
                                                                                          /
Initials/Date
: d. At least 15 data sets were included in Verification Test result.
                                                                                          /
Initials/Date SP-1 78                                Rev. 30                                    Page 46 of 207
 
4.5.5    IF calculation indicated that Integrated Leak Rate Test is substantiated by verification test, THEN record acceptance in Attachment 1 AND proceed to Step 0.
                                                                                          /
Initials/Date 4.5.6    IF calculation indicates that Integrated Leak Rate Test is NOT substantiated by verification test, THEN perform the following (N/A unused steps):
4.5.6.1 Continue data acquisition until data stabilizes within acceptance criteria band (if appropriate).
                                                                                          /
Initials/Date 4.5.6.2 Recheck verification flow meters AND ILRT measurement system, raw data and leak rate calculations for errors.
                                                                                          /
Initials/Date 4.5.6.3 IF errors are found and corrected, THEN continue verification test data acquisition until requirements of 4.5.4.1 or 4.5.4.2 are met.
                                                                                          /
Initials/Date 4.5.6.4 IF NO errors can be found AND test pressure is still above 0.96Pa, THEN consider securing superimposed leak and re-measuring Lam'(restart ILRT) per Section 4.4.
                                                                                          /
Initials/Date 4.5.7  WHEN Verification Test acceptance criteria has been met, THEN perform the following:
4.5.7.1 Record the time and date for the start of the Verification Test:
Time (24 hr clock):                Date:
                                                                                          /
Initials/Date 4.5.7.2 Record end of Verification Test Phase Water Levels on Attachment 14, (Control Room Log).
                                                                                          /
Initials/Date SP-1 78                                    Rev. 30                                Page 47 of 207
 
4.5.7.3 Trend Report on plant computer is setup to monitor levels in Attachment 14, (Control Room Log) can be discontinued.
                                                                                              /
Initials/Date 4.5.7.4 Secure imposed leak, Lo by isolating the flowmeter. CLOSE LRV-64 or LRV-65
                                                                                              /
Initials/Date NOTE Restoration of plant and containment from ILRT may begin at SSO's / test supervisor's discretion (Attachment 3B may provide a safe place to start).
Notify Maintenance Support and Compressor vendor that break-down and removal of pressurization system compressors may begin.
Wear appropriate hearing protection in all areas so designated.
4.6          Depressurization 4.6.1        Announce the following 3 times over plant page.
            "ATTENTION ALL PERSONNEL, ATTENTION ALL PERSONNEL, REACTOR CONTAINMENT BUILDING DEPRESSURIZATION IS ABOUT TO COMMENCE. ALL NON ESSENTIAL PERSONNEL STAND CLEAR OF THE SOUTHWEST TURBINE BLDG 119 EL AND WEST BERM AREA BETWEEN CONDENSATE STORAGE TANK AND FIRE SERVICE TANKS."
                                                                                              /
Initials/Date CAUTION WHEN a depressurization path throttle valve is full open, AND depressurization rate has fallen below 15 psi, THEN begin to OPEN a secondary depress path throttle valve. Maintain a maximum depressurization rate NOT to exceed 15 psi/hr. The depressurization rate will be monitored minute-by-minute from the ILRT test table, and directions to open/close valves will originate there to enable controlling the depressurization rate.
4.6.2        IF either of the airlocks are pressurized at the end of the ILRT take steps to depressurize the airlock(s) to prevent damaging the inner door by inappropriately applied d/p. The airlock must be depressurized or always at a pressure below containment pressure.
                                                                                              /
Initials/Date SP-1 78                                        Rev. 30                                Page 48 of 207
 
4.6.3    WHEN permission from Test Supervisor is given, THEN SLOWLY OPEN a depressurization path blowdown valves and release air from containment, maintaining a maximum rate of 15 psi/hr. The following penetrations are listed in order of preference, however, they may be selected as a depressurization path in any order.
4.6.3.1      Pen-305/306 (6")
4.6.3.1.1  NOTIFY Chemistry to generate GRWRP for RB purge (batch type)
* __  ENSURE Chemistry submits GRWRP to Operations when sampling and analysis are completed
                                                                                        /
Initials/Date 4.6.3.1.2  ENSURE RB exhaust fans are aligned to normal operation
* PLACE "PERMISSIVE BYPASS" switch in "NORMAL" and KEY REMOVED AHF-7A vent MCC-3A, Unit 10C AHF-7B vent MCC-3B, Unit 9C
                                                                                        /
Initials/Date 4.6.3.1.3  ENSURE RB exhaust dampers are aligned to normal operation
* Both 3 way valves on Air Handling Panel 13 pointing to left (Normal Operation)
AHV-77 SELECTED to Normal operation of AHD-95, AHD-96, and AHD-94
_  AHV-78 SELECTED to Normal operation of AHD-97, AHD-98, and AHD-94
                                                                                        /
Initials/Date 4.6.3.1.4  ENSURE Particulate, Iodine, and Gaseous Channels of Reactor Bldg.
Purge Duct Monitor are operating prior to and during purge operation
: 1.      WHEN energization of RM-A1 is required, THEN PERFORM Enclosure 7 of OP-417, Startup/Shutdown of RM-A1
: 2.      PERFORM all sections of SP-335E, RM-A1 Interlock with LRV Valves
                                                                                        /
Initials/Date SP-1 78                                  Rev. 30                                Page 49 of 207
 
NOTE The "Reactor Bldg Purge Air Flow Low" alarm is expected to come in when AHF-7A or AHF-7B is started. As long as Step 4.6.3.1.6 (flow requirement) is met, no actions are required.
4.6.3.1.5 START Reactor Bldg Purge Exhaust Fan
: 1. __ NOTIFY Chemistry prior to start of purge
: 2.        START AHF-7A OR START AHF-7B
: 3. __    NOTIFY HP that RB purge has started
: 4. __    RECORD Start Time and Date on "Permit Completion" section of GRWRP
                                                                                  /
Initials/Date 4.6.3.1.6 PERFORM Channel Check on AH-1003-TIR (FE) (Channel 4) ensuring
                  >20,000 scfm and at least once per 12 hours during purge operation 0    -  RECORD Channel Check on Enclosure 9 of OP-417, RB Purge Channel Check Log
                                                                                  /
Initials/Date 4.6.3.1.7 PERFORM RM-A1 gas Channel Checks every 12 hours
* _RECORD        Channel Check on Enclosure 9 of OP-417, RB Purge Channel Check Log I/
Initials/Date SP-1 78                                Rev. 30                            Page 50 of 207
 
4.6.3.1.8  PERFORM RB depressurization
: 1.      CLOSE LRV-121 CLOSE LRV-123 OPEN LRV-119 OPEN LRV-120
: 2.      OPEN LRV-70 OPEN LRV-71 OPEN LRV-72 OPEN LRV-73
: 3.      OPEN or THROTTLE LRV-1 22, as necessary to maintain a maximum depressurization rate NOT to exceed 15 psi/hr
: 4. __  NOTIFY HP and CHEMISTRY when flow is established, so they can obtain required samples
                                                                                    /
Initials/Date 4.6.3.2  Pen-216 (8")
* ___CLOSE PEN216-TV3 (compressor isolation valve)
* _OPEN PEN216-TV4 (muffler isolation valve)
* _OPEN PEN216-TV1 (penetration isolation valve)
* OPEN or THROTTLE PEN216-TV2 (throttle valve) as necessary to maintain a maximum depressurization rate NOT to exceed 15 psi/hr
                                                                                    /
Initials/Date 4.6.3.3  Pen-217 (8")
* _CLOSE PEN217-TV7 (compressor isolation valve)
* _OPEN PEN217-TV8 (muffler isolation valve)
* _eOPEN PEN217-TV5 (penetration isolation valve)
* _OPEN or THROTTLE PEN217-TV6 (throttle valve) as necessary to maintain a maximum depressurization rate not to exceed 15 psi/hr
                                                                                    /
Initials/Date SP-178                                Rev. 30                              Page 51 of 207
 
4.6.3.4 Pen-122 (3")
* __ENSURE removal of blind flange downstream of LRV-99 0    CLOSE LRV-98
* _OPEN LRV-87
* _OPEN LRV-88
                                                                                /
Initials/Date 4.6.3.5 Pen-121 (3")
0    ENSURE removal of blind flange downstream of LRV-101
              *  -CLOSE LRV-100
* OPEN LRV-89
* OPEN LRV-90
                                                                              /
Initials/Date 4.6.3.6 Pen-125 (3")
* _ENSURE removal of blind flange downstream of LRV-105
* _CLOSE LRV-104
* OPEN LRV-93
* _OPEN LRV-94
                                                                              /
Initials/Date 4.6.3.7 Pen-125 (3")
* _ENSURE removal of blind flange downstream of LRV-103
* _CLOSE LRV-102
* _OPEN LRV-91
* _OPEN LRV-92
                                                                              /
Initials/Date SP-178                            Rev. 30                              Page 52 of 207
 
4.6.4      WHEN containment pressure is less than 2 psig, THEN containment atmosphere SHALL be sampled by Health Physics followed by containment entry and final walk through prior to allowing personnel access.
I/
Initials/Date 4.7        Final ILRT Results NOTE Only the "As Left" leakage calculated in step 4.7.1.1 below must be met prior to entering a mode of operation that requires containment integrity. Unacceptable "As Found" or "Performance" leakage rates may be dispositioned per the Containment Leak Rate Testing Program and CAP-NGGC-0200, Corrective Action Program.
4.7.1      WHEN all local leakage rate additions AND corrections to ILRT are known, THEN CALCULATE Final ILRT leakage rates in Attachment 15, (ILRT Results Summary).
4.7.1.1 "AS LEFT" Leakage:
Sum of above reported Lam & UCL "AS LEFT" (from Attachment 15 Section 8):                %wt/day < 0.1875%wt/day
                                                                                            /
Initials/Date 4.7.1.2 "AS FOUND" Leakage:
Sum of above reported Lam & UCL "AS FOUND" (from Attachment 15 Section 9).
(from Attachment 15 Section 9):                %wt/day < 0.25%wt/day
                                                                                            /
Initials/Date 4.7.1.3 PERFORMANCE Leakage:
Sum of above report Lam & UCL "AS LEFT" and as-left minimum pathway leakage rate of any pathway isolated during ILRT due to excessive leakage (from "As-Left" results Attachment 15 Section 8)
(from Attachment 15 Section 8):                %wt/day < 0.25%wt/day
                                                                                            /
SP-1 78                                      Rev. 30                                Page 53 of 207
 
Initials/Date SP-1 78 Rev. 30 Page 54 of 207
 
5.0      FOLLOW UP ACTIONS 5.1    Contingencies See Attachment 11 6.0      RESTORATION 6.1    Restoration Instructions 6.1.1  Inform SSO RB depressurization is complete.
                                                                                /
Initials/Date 6.1.2  Restore depressurization paths:
6.1.2.1    Pen-305/306 6.1.2.1.1  ENSURE CLOSED:
LRV-70        LRV-71 LRV-72        LRV-73 LRV-119      LRV-120 LRV-122
                                                                                /
Initials/Date 6.1.2.1.2  RECORD Stop Time and Date on "Permit Completion" section of GRWRP
                                                                                /
Initials/Date 6.1.2.1.3  STOP Reactor Bldg Purge Exhaust Fans
* _STOP      AHF-7A AND
* _STOP      AHF-7B
                                                                                /
Initials/Date SP-1 78                                Rev. 30                          Page 55 of 207
 
6.1.2.1.4  COMPLETE GRWRP
: 1. __ COMPLETE Permit Completion section.
: 2.    - ATTACH Enclosure 9 of OP-417, RB Purge Channel Check Log, to GRWRP
: 3. __ RETURN original Permit to Chemistry Department
: 4. __ DE-ENERGIZE RM-A1 using Enclosure 7 of OP-417, Startup/Shutdown of RM-A1
                                                                                  /
Initials/Date 6.1.2.2  Pen-216 (8")
* _REMOVE PEN216-TV1 (penetration isolation valve)
* _REMOVE test flange
* __ENSURE permanent flange is reinstalled
                                                                                  /
Initials/Date 6.1.2.3  Pen-217 (8")
* _REMOVE PEN217-TV5 (penetration isolation valve)
* _REMOVE test flange
* _ENSURE permanent flange is reinstalled
                                                                                  /
Initials/Date 6.1.2.4  Pen-122 (3")
* _ENSURE reinstallation of blind flange downstream of LRV-99
* _CLOSE LRV-87
* _CLOSE LRV-88
                                                                                  /
Initials/Date SP-178                                Rev. 30                            Page 56 of 207
 
6.1.2.5 Pen-121 (3")
* _ENSURE reinstallation of blind flange downstream of LRV-101 CLOSE LRV-89 CLOSE LRV-90
                                                                                  /
Initials/Date 6.1.2.6 Pen-125 (3")
* __ENSURE reinstallation of blind flange downstream of LRV-105 CLOSE LRV-93 CLOSE LRV-94
                                                                                  /
Initials/Date 6.1.2.7 Pen-125 (3")
* _ENSURE reinstallation of blind flange downstream of LRV-103
* _CLOSE LRV-91
* _CLOSE LRV-92 Initials/Date 6.1.3  REINSTALL LRV-69 and LRV-63 and associated tubing removed in Step 3.4.10.
                                                                                  /
Initials/Date 6.1.4  REMOVE all instrumentation specified under Attachment 17.
                                                                                "" /
Initials/Date 6.1.5  REMOVE instrumentation installed from Attachment 5.
                                                                                  /
Initials/Date SP-178                              Rev. 30                              Page 57 of 207
 
6.1.6  COMPLETE removal of temporary pressurization/depressurization system piping and components and restoration of permanent plant components per Attachment 4.
                                                                                        /
Initials/Date 6.1.7  RESTORE all valves and breakers to correct Post Test position as outlined in Attachments 3A, 3B, 3C, 3D, 3E, 4, 6,7 and 8 or as required by CRS. IF CRS or SSO requires use of check-off list (COL), THEN document COLs used in Comments Section. Attach all COLs to this procedure.
                                                                                        /
Initials/Date 6.1.8  COMPLETE Attachment 2, returning all equipment which could be damaged by high pressure to its pre-test condition, or as required by CRS or SSO.
                                                                                        /
Initials/Date 6.1.9  REMOVE the jumpers installed and close the sliding links opened in Attachment 2.
                                                                                        /
Initials/Date 6.1.10  Independently verify jumper removal and closing of sliding links in Attachment 2.
                                                                                        /
Initials/Date 6.1.11 Recalibrate per SP-1 12R, RPS Reactor Building Pressure Trip Calibration, and SP-132A/B/C, Engineered Safeguards Channel 1/2/3 Calibration, the following instruments:
o        BS-18-PS            o        BS-26-PS o        BS-19-PS            o        BS-27-PS o        BS-20-PS            o        BS-28-PS o        BS-21-PS            o        BS-29-PS o        BS-22-PS            o        BS-59-PS o        BS-23-PS            o        BS-60-PS o        BS-24-PS            o        BS-61-PS o        BS-25-PS            o        BS-62-PS
                                                                                        /
Initials/Date SP-178                                    Rev. 30                                Page 58 of 207
 
6.1.12  Restore Radiation Monitors RM-G16, RM-G17 and RM-G18 and associated Radiation Monitoring System), and restore G-M tubes per Attachment 2.
                                                                                  /
Initials/Date 6.1.13  RESTORE Reactor Building Cooling Unit, AHF-1A, 1B or 1C as indicated in step 3.4.52, per Attachment 2.
                                                                                  /
Initials/Date 6.1.14  NOTIFY SSO the ILRT is complete.
                                                                                  /
Initials/Date SP-1 78                                Rev. 30                            Page 59 of 207
 
7.0    COMMENTS Page _    of SP-1 78          Rev. 30    Page 60 of 207
 
Comments continued:                        Page -    of Make additional copies as necessary SP-178                              Rev. 30    Page 61 of 207
 
Test Performer Signatures:
Print Name:              Initials:        Signature/Date:
SP-1 78                            Rev. 30                Page 62 of 207
 
8.0    EVALUATION 8.1    Equipment Performance Review Comments:
Reviewed By:
Programs and Components Review / Date SP-1 78                            Rev. 30                    Page 63 of 207
 
ATTACHMENT 1 TEST SUPERVISOR'S LOG (Page 1 of 1)
DATE:              /
Page      of TIME:              REMARKS:
NOTE: MAKE ADDITIONAL SHEETS AS NECESSARY. AUTOLOG IS AN ACCEPTABLE LOG METHOD.
SP-178                          Rev. 30                      Page 64 of 207
 
ATTACHMENT 2 CONTAINMENT PREPARATION CHECKLIST MECHANICAL MAINTENANCE:
EQUIPMENT PROTECTION/PREPARATION Any equipment which may be damaged when subjected to high pressure should be removed from containment or vented. NOT included is any instrumentation associated with containment isolation or monitoring of accident conditions. Use blank lines to document any items removed or vented NOT already listed in this attachment. Removed equipment SHALL be properly stored.
EQUIPMENT                                    PROTECTION                          VERIFICATION SIGNATURE & DATE COMPLETED        RESTORED Main Bridge Fuel Handling Hoist (2)      Ensure that the vents are clear for the gear box Main__BridgeFuel__andling        __oist (2)    oil reservoirs Main Bridge Trolley Travel Gear Box      Ensure that the vents are clear for the gear box il reservoir oil reservoir Ensure  that the vents are clear for the gear box Aux Bridge Trolley Travel Gear Box        oirervr_________
SGear Box (FACR-4A)            Ensure  that the vents are clear for the gear box oil reservoir Upender    Gear Box (FACR-4A)            oil reservoir Upender Gear Box (FACR-4B)                Ensure that the vents are clear for the gear box oil reservoir                                        ________          _______
Remove the vent plugs from the gear box oil Main Bridge Travel Gear Box reservoir Aux  ride TrvelGearBoxRemove                    the vent plugs from the gear box oil reservoir Nitrogen, argon oxygen/acetylene,        Remove from containment (etc.) bottles RB cooling unit AHF-1A, 1B, or 1C temporarily modified with flow baffle    Ensure that fan will operate if needed due to Cat ID# 52700753 (only one unit          higher density of compressed air during ILRT.
required, as indicated in step 3.4.52). 1                                                    1                  1                    11 SP-1 78                                                    Rev. 30                                                    Page 65 of 207
 
ATTACHMENT 2.
CONTAINMENT PREPARATION CHECKLIST INSTRUMENTATION & CONTROLS EQUIPMENT PROTECTIONIPREPARATION Any equipment which may be damaged when subjected to high pressure should be removed from containment or vented. NOT included is any instrumentation associated with containment isolation or monitoring of accident conditions. Use blank lines to document any items removed or vented NOT already listed in this attachment. Removed equipment SHALL be properly stored.
EQUIPMENT                                          PROTECTION                        VERIFICATION SIGNATURE
                                                                                                                & DATE COMPLETED        RESTORED Loosen front cover, insert a 1/8-in. paper wedge Nuclear Services Closed Cycle Cooling        between the cover's seating surfaces, then tighten System flow indicator SW-209-FI              the cover loosely. The switch should be covered with plastic to prevent entry of dirt and moisture.
Loosen front cover, insert a 1/8-in. paper wedge AH-656-FIS, a Brooks Model #1110 flow        between the cover's seating surfaces, then tighten switch                                      the cover loosely. The switch should be covered with plastic to prevent entry of dirt and moisture.
Loosen front cover, insert a 1/8-in. paper wedge AH-657-FIS, a Brooks Model #1110 flow        between the cover's seating surfaces, then tighten switch                                      the cover loosely. The switch should be covered with plastic to prevent entry of dirt and moisture.
Loosen front cover, insert a 1/8-in. paper wedge AH-658-FIS, a Brooks Model #1110 flow        between the cover's seating surfaces, then tighten switch                                      the cover loosely. The switch should be covered with plastic to prevent entry of dirt and moisture.
Loosen front cover, insert a 1/8-in. paper wedge between the cover's seating surfaces, then tighten the cover loosely. The switch should be covered with plastic to prevent entry of dirt and moisture.
Loosen front cover, insert a 1/8-in. paper wedge 1Brooks rotameter transmitter  between the cover's seating surfaces, then tighten the cover loosely. The switch should be covered with I      __                                  Iplastic to prevent entry of dirt and moisture.
SP-178                                                      Rev. 30                                                  Page 66 of 207
 
ATTACHMENT 2 CONTAINMENT PREPARATION CHECKLIST INSTRUMENTATION & CONTROLS EQUIPMENT                                          PROTECTION                      VERIFICATION SIGNATURE
                                                                                                        & DATE COMPLETED    RESTORED Loosen front cover, insert a 1/8-in. paper wedge between the cover's seating surfaces, then tighten the cover loosely. The switch should be covered with plastic to prevent entry of dirt and moisture.
Loosen front cover, insert a 1/8-in. paper wedge MU-31 -FT4, Brooks rotameter transmitter  between the cover's seating surfaces, then tighten the cover loosely. The switch should be covered with plastic to prevent entry of dirt and moisture.
Loosen front cover, insert a 1/8-in. paper wedge DW-23-FIC, Brooks rotameter transmitter    between the cover's seating surfaces, then tighten the cover loosely. The switch should be covered with plastic to prevent entry of dirt and moisture.
Loosen front cover, insert a 1/8-in. paper wedge between the cover's seating surfaces, then tighten the cover loosely. The switch should be covered with plastic to prevent entry of dirt and moisture.
Loosen front cover, insert a 1/8-in. paper wedge between the cover's seating surfaces, then tighten the cover loosely. The switch should be covered with plastic to prevent entry of dirt and moisture.
Loosen front cover, insert a 1/8-in. paper wedge between the cover's seating surfaces, then tighten the cover loosely. The switch should be covered with plastic to prevent entry of dirt and moisture.
NOTE: TSI Material must be removed at preamplifier NI-002-B4 to permit access to box covers.
SP-178                                                  Rev. 30                                            Page 67 of 207
 
ATTACHMENT 2 CONTAINMENT PREPARATION CHECKLIST INSTRUMENTATION & CONTROLS EQUIPMENT                                      PROTECTION                        VERIFICATION SIGNATURE
                                                                                                          & DATE COMPLETED    RESTORED Loosen both the inner and outer box covers. Insert a NI-001-A4                                1/8-in. paper wedge and retighten the covers loosely.
Nuclear instrumentation preamplifier      The outer box should be covered with plastic to prevent entry of dirt and moisture.
Loosen both the inner and outer box covers. Insert a NI-002-B4                                1/8-in. paper wedge and retighten the covers loosely.
Nuclear instrumentation preamplifiers    The outer box should be covered with plastic to prevent entry of dirt and moisture.
RB cooling unit AHF-1A, 1B, or 1C temporarily modified with 129 Amp        Ensures fan will operate if needed due to higher overload (only one unit required, as    density of compressed air during ILRT.
indicated in step 3.4.52).
Radiation Monitor RM-G16, RM-G17 and    Remove G-M tubes (if required) RM-G16, RM-G17 RM-G18 GM Tubes                          and RM-G18 t                                                      +            +
SP-178                                                Rev. 30                                                Page 68 of 207
 
ATTACHMENT 2 CONTAINMENT PREPARATION CHECKLIST OTHER WORK GROUPS OPERATIONS (REFUELING TEAM)
EQUIPMENT                                PROTECTION                      VERIFICATION SIGNATURE & DATE 1_                                1                                                    COMPLETED      RESTORED TV monitor                          Remove from containment (if required)
Position readout units            Remove from containment (if required)
Load meters and power supply      Remove from containment (if required)
Remove any controls containing electrolytic Refueling Bridge Controls          capacitors that could leak from exposure to the
_1_              _  1pressure ELECTRICAL MAINTENANCE EQUIPMENT                                PROTECTION                      VERIFICATION SIGNATURE & DATE COMPLETED      RESTORED Polar Crane normal lighting.      Remove Polar Crane emergency lighting. Remove Remove any controls containing electrolytic Polar Crane Controls                capacitors that could leak from exposure to the pressure 4                                                                  1 I                                                  1                1 SP-178                                                Rev. 30                                            Page 69 of 207
 
ATTACHMENT 2 CONTAINMENT PREPARATION CHECKLIST OTHER WORK GROUPS OTHER WORK GROUPS: CONTAINMENT COORDINATOR OVERSEES EQUIPMENT                            PROTECTION                          VERIFICATION SIGNATURE & DATE COMPLETED      RESTORED Nitrogen, argon oxygen/ acetylene, Remove from containment (etc.) bottles Fire extinguishers                Remove from containment Wooden scaffolding                Remove from containment Gang boxes                        Vent boxes, remove aerosol cans, tubes of lubricant Temporary Fluorescent &            Remove from containment incandescent lights Computer monitors, CCTV monitors, test equipment with tube-based    Remove from containment displays Vent drum by removing bunge hole cover or 55 gallon storage drums            popping lid Spray Units                        Vent any those    spray used      units that are pressure tight (e.g.
for de-contamination)
SP-1 78                                              Rev. 30                                                Page 70 of 207
 
ATTACHMENT 3 ILRT VALVE LINEUP INSTRUCTIONS CHECKLIST CONTENTS:
ATTACHMENT 3A: ILRT VALVE LINEUPS PRIOR TO PRESSURIZATION Checklist consists of penetration alignments that must be completed prior to start of pressurization either because they include components to check while access is available to containment, OR to avoid potential closure problems once pressurization has started. NO penetration containing liquid is vented OR drained by this procedure, AND lineups are NOT sequence critical.
ATTACHMENT 3B: ILRT VALVE LINEUPS PRIOR TO STABILIZATION Checklist consists of penetration alignments that may be completed after pressurization has started because they include NO components to position inside containment, or those components are remotely operated in closed systems NOT exposed to test pressure. A penalty addition is planned for all of these penetrations so closure method and closure sequence is NOT critical.
ATTACHMENT 3C: ILRT SPECIAL VALVE LINEUPS Checklist consists of penetration alignments that must be completed prior to the start of pressurization, and are considered to be sequence critical.
CHECKLIST COMPLETION:
CAUTION Unless otherwise instructed by the Superintendent Shift Operations, IF line will be opened/vented OR CIVs must be opened DO NOT perform the Penetration Line Up when containment integrity is required. Penetration lineups that do NOT entail opening lines, venting/draining systems may be performed anytime as directed by the Test Supervisor.
Issue the Line up Checklists to Operations and attach a copy of these instructions CAUTION Do NOT change Clearance Tagout boundaries without first obtaining approval from ILRT Test Supervisor AND Test Supervisor.
Clearance Tagouts will only be used when already in place for maintenance when a system's piping is opened for the test (e.g. vented to atmosphere), or for personnel safety.
Caution or Test Tagging if required is used sparingly to save time, and minimize demand on resources. Caution or Test Tags are information tags placed on valves/components moved from their NORMAL position for the ILRT (i.e. if the "Test Position" is the same as the component's normal position, a tag is not hung).
NO liquid filled penetrations are being vented/drained as part of this line-up.
Perform ATTACHMENT 3C in the order written for systems to be vented/opened to simplify proper venting of the system.
SP-1 78                                        Rev. 30                                Page 71 of 207
 
ATTACHMENT 3 ILRT VALVE LINEUP INSTRUCTIONS Except in cases where a penetration will be vented, the lineup is organized (sorted) by location to facilitate its completion.
Most penetrations in Attachments 3A will NOT be vented, AND none in Attachment 3B. Their line-ups may be performed in any order, providing all piping is depressurized.
GENERAL INSTRUCTIONS:
IF a containment isolation valve in Penetrations that will be vented/tested by the ILRT (See ) has NOT been closed via normal means THEN stroke valve prior to closure per the Line Up Checklist to demonstrate they were closed by their normal mode of force. Record any Containment Isolation Valve closure NOT by normal means in the Test Exception Log.
Lineups in Attachments 3A and 3B are suggested lineups, intended to disposition a penetration for the ILRT. These lineups may be modified if required with the concurrence of the ILRT Test Director and the Test Supervisor. Any variation from this lineup MUST be documented in , (Test Exception Log), AND testing status of the penetration reviewed and updated (if changed) in Attachment 9, (Containment Penetration Summary).,
Modifications to component line-ups may be required during the preparations for the ILRT. , (Valve Lineup Alteration Log) will be used to track changes requested to a system/penetration lineup once signed off as completed for the ILRT. The component position MUST be returned to the "Test Position" prior to starting compressors or stabilization as appropriate (reviews are cued by the procedure). Any temporary valve lineup alteration that can NOT be restored prior to the test must be accepted by the ILRT Test Director, and be dispositioned as stated in the previous paragraph above via Test Exception Log.
ILRT "Test Position" may be verified through review of administrative controls documents (e.g. a completed Containment Integrity Checklist OR Equipment Tagout Log, Locked Valve Log, etc.) at the sole discretion of the Test Supervisor. Components verified through review or acceptance of administrative controls will be denoted with a printed "A" for "Admin." in the initials/date block to facilitate identification of verifications performed in this manner.
Component positions verified by Visual Verification will be initialed per normal practice. A Functional Verification will be documented as described in AI-500, Appendix 10.
Component position may also be accepted if the component is part of a Clearance that will remain in force throughout the ILRT window. In these cases the Test Supervisor will sign-on to the applicable Clearance.
FLANGES/PIPE CAPS:
The drain/vent flange and bolts may be left attached as long as flange is swung to the side. The bolts must be installed finger-tight so that flange can NOT block vent OR drain path during the ILRT.
At completion of each Checklist all drain hoses need to be evaluated for removal. Determine if future activities need (scheduled clearance or maintenance) a drain hose.
SP-178                                          Rev. 30                                Page 72 of 207
 
ATTACHMENT 3 ILRT VALVE LINEUP INSTRUCTIONS Do NOT obstruct pipe vents/drains inside OR outside containment, this will invalidate the ILRT for this penetration.
DEFINITIONS:
Test Tag Closed. Position the valve in the closed position and attach a Test Tag at the appropriate location.
Test Tag Open. Position the valve in the open position and attach a Test Tag at the appropriate location.
ORC. Outside Reactor Containment IRC. Inside Reactor Containment PENETRATION RESTORATION CHECKLIST INSTRUCTIONS:
Components NOT returned to their AS FOUND condition shall be authorized by either the ILRT Test Supervisor OR CRS. Documentation for the reason the component was NOT returned to the AS FOUND condition shall be annotated or attached to the applicable Attachment.
Independent Verification of valve restoration may be "N/A" if the test lineup position is the same as the restored position.
Re-issue the lineup checklists for completion of penetration restoration to Operations and attach a copy of these instructions.
Except for portions of the lineup accomplished via clearance, the restoration may be signed off in any order. Restore vented/drained penetrations per Operations Lineup Coordinator/Clearance to prevent inadvertent release of fluids through the ILRT test boundary.
Instrument Air penetrations must be restored prior to restoring any penetrations containing AOVs.
Dispose of all In ILRT Information Tags, bags, etc. in the appropriate manner.
SP-1 78                                      Rev. 30                                  Page 73 of 207
 
ATTACHMENT 3 ILRT VALVE LINEUP INSTRUCTIONS LUSYSTEM L/UPEN.                      PEN#            PE.TEST          STATUS      PRGMJ APP. L/U  RESTORE ATTACH.                                      DESCRIPTION                      STATUS SEQ. SEQ.
3A      Main Steam              105      MSL A-2        Normal Standby    N/R 3AMain        Steam106                  MLA-1Nora                S 3A      Main Steam              106      MSL A-i        Normal Standby    N/R 3AManStem10 MSL-2ormlStnL/U 3A 3AMain Main Steam              107      MSL B-2 ML-N            La2 Normal Standby N/R l StandbyN 3A      Main Steam              201      MSL B-i        Normal Standby N/R L/U Normal Standby 3A, 3B  Main Steam              314      RCSG 1-B Drain  L/U, Bottled Up  N/R for PI 3B      Main Steam              316      RCSG Vent 1-A Sec    Normal L/U      Standby  NIR Normal Standby 3A, 3B    Main Steam            318      RCSG 1-A Drain  L/U, Bottled Up  N/R for PI 3B        Main Steam            320      RCSG 1-B Sec Vent            Normal L/U      Standby  N/R 3B        Main Steam            427      RCSG 1-B Drain  Normal Standby    N/R L/U 3B        Main Steam            428      RCSG 1-A Drain  Normal Standby    N/R L/U 3A, 3B    Feedwater & Emerg. FW  108      Main FW "B"
______L/U          Normal Standby    N/R 3A, 3B    Feedwater & Emerg. FW  109      EFW "B"        Normal Standby    N/R L/U 3A, 3B    Feedwater & Emerg. FW  423      Main FW "A"    Normal Standby    N/R L/U 3A, 3B    Feedwater & Emerg. FW  424      EFW "A"        Normal Standby    N/R L/U SP-1 78                                        Rev. 30                                  Page 74 of 207
 
ATTACHMENT 3 ILRT VALVE LINEUP INSTRUCTIONS L/U                                          PEN.                      APP. J  L/U  RESTORE ATTACH.            SYSTEM        PEN#                    TEST STATUS      PRGM  SEQ. SEQ.
DESCRIPTION ATTACH.                        STATUS  SEQ. SEQ Demin Wtr to 3A, 3B  Condensate & Demin Water 117    CNTMNT          Take Penalty    Type C 3C      Instrument & Station Air 110    Station Air    ILRT is Testing Type C 3C      Instrument & Station Air 111    Instrument Air  ILRT is Testing Type C 3C      Instrument & Station Air 112    Instrument Air  ILRT is Testing Type C 3B      Nuclear Services Closed  321    Letdown CIr 3B  Normal Standby  NIR Cycle Cooling                  Supply          L/U_
3B      Nuclear Services Closed  322    Letdown CIr 3B  Normal Standby  N/R Cycle Cooling                  Return          L/U 3B      Nuclear Services Closed  360    Letdown CIr    Normal Standby Cycle Cooling                  3A/3C Supply                    N/R L/U 3B      Nuclear Services Closed  361    Letdown CIr    Normal Standby  N/R Cycle Cooling                  3A/3C Return    L/U_
Nuclear Services Closed                        Normal Standby 3B      Cycle Cooling            330    CRDMS Supply    N/m            N/R 3B      Nuclear Services Closed  331    CRDMS Return    Normal Standby  N/R Cycle Cooling                                  L/U_
3B      Nuclear Services Closed  358    RB Vent Fan 3C  Normal Standby  N/R Cycle Cooling                  Supply          L/U 3B      Nuclear Services Closed  359    RB Vent Fan 3C  Normal Standby  N/R
        -Cycle Cooling                  Return          L/U 3B      Nuclear Services Closed  368    RB Vent Fan 3A  Normal Standby  N/R Cycle Cooling                  Supply          L/U 3B      Nuclear Services Closed  369    RB Vent Fan 3A  Normal Standby  N/R Cycle Cooling                  Return          L/IU 3B      Nuclear Services Closed  370    RB Vent Fan 3B  Normal Standby  N/R Cycle Cooling                  Supply          L/U_
3B      Nuclear Services Closed  371    RB Vent Fan 3B  Normal Standby  N/R Cycle Cooling                  Return          L/U_
SP-1 78                                      Rev. 30                                    Page 75 of 207
 
ATTACHMENT 3 ILRT VALVE LINEUP INSTRUCTIONS L/U                                                      PEN.                            APP. J  L/U  RESTORE ATTACH.                    SYSTEM          PEN#                        TEST STATUS        PRGM  SEQ. SEQ.
HDESCRIPTION                        STATUS 3B              Nuclear Services Closed            RCP 10 Return      Normal Standby    N/R 3B    _        Cycle Cooling                                          L/U 3B              Nuclear Services Closed  325      RCP 1C Supply      Normal Standby    N/R 3B__Cycle              Cooling            3                            L/U 3B              Nuclear Services Closed  363      RCP 1D Return      Normal Standby    N/R Cycle Cooling                                          L/UN Nuclear Services Closed  362      RCP 1D            Normal Standby    N/R 3B              Cycle Cooling            32        RPDSpl            L/UN/R 3B              Nuclear Services Closed  324      RCP 1A Return      Normal Standby    N/R Cycle Cooling                                          L/U 3B              Nuclear Services Closed  323      RCP 1A Supply      Normal Standby    N/R 3B      _Cycle        Cooling                                          L/U 3B              Nuclear Services Closed  365      RCP 1B Return      Normal Standby    N/R Cycle Cooling                                          L/U 3B              Nuclear Services Closed  364      RCP 18 Supply      Normal Standby    N/R Cycle Cooling                                          L/U 3A, 3B          Spent Fuel Cooling        347      Purification Fuel Trnsfrci      Take Penalty TakePenaty_        Type C Type_
3A              Spent Fuel Cooling        348      Fuel Transfer      ILRT is Testing  Type B Tube_______                        _
3A              Spent Fuel Cooling        436      Fuel Transfer      ILRT is Testing  Type B Tube_______                        _
3B              Decay Heat Removal        329      PZR Sprayline    Take Penalty      Type C OP L/U          Decay Heat Removal        345      RB Sump Recirc    Normal Standby    N/R L/U_
OP L/U          Decay Heat Removal        346      RB Sump Recirc    Normal Standby    N/R 3A              Reactor Coolant          N/A 3B              Makeup & Purification    333      Letdown to Purif  Take Penalty      Type C I_                      I        I Demin            I SP-1 78                                                  Rev. 30                                        Page 76 of 207
 
ATTACHMENT 3 ILRT VALVE LINEUP INSTRUCTIONS L/U                                                                      PEN.                      APP. J      L/U    RESTORE ATTACH.                    SYSTEM                            PEN#                    TEST STATUS    PRGM        SEQ.      SEQ.
                                                                      .DESCRIPTION                  STATUS 3B      Makeup & Purification                                353    HPI to RB Sump  Take Penalty  Type C 3A, 3B  Makeup & Purification                                377    RCP Seal        Take Penalty  Type C 3A,3B  Meu&PBleedoff 3B      Makeup & Purification                                338    RCP Seal Suppl  Normal Standby N/R 3BMeup&                    Puifiction338__Pealuppy                                  L/U 3B      Makeup & Purification                                434    HPCI            Normal Standby N/R L/U 3B      Makeup & Purification                                435    Makeup & HPCI  Normal Standby N/R L/U 3B      Makeup & Purification                                336    HPCI            Normal Standby N/R L/U_
3B      Makeup & Purification                                337    HPCI            Normal Standby N/R L/U 3B      Liquid Sampling                                      425    PASS            Take Penalty  Type C 3B      Liquid Sampling                                      439    PZR & RCS      Take Penalty  Type C
____      ____        ____  ____Sample_                                          _ _  _ __ _  _  _ _
3B      Liquid Sampling                                      440    SG 3A Sample    Take Penalty  Type C 3B      Liquid Sampling                                      441    SG 3B Sample    Take Penalty  Type C 3C      Nitrogen                                            317    N2 tondG        Take Penalty  Type C
_____________________SecondaryTaePnlyyp                                                          C 3C      Nitrogen                                            355    N2 to RCS      Take Penalty  Type C 3C      Nitrogen                                            372    N2 to RCDT      Take Penalty  Type C 3C      Core Flood                                          123    N2 to CFT 1A    Take Penalty  Type C 3C      Core Flood                                          124    N2 to CFT 1B    Take Penalty  Type C SP-178                                                                  Rev. 30                                          Page 77 of 207
 
ATTACHMENT 3 ILRT VALVE LINEUP INSTRUCTIONS L/U                                                PEN.                          APP. J  L/U  RESTORE ATC            SYSTEM            PEN#                        TEST STATUS        PRGM  SEQ    SEQ.
ATTACH.                                            DESCRIPTION                      STATUS  SEQ. SEQ.
3A      Core Flood                  350          CFT M/U        Take Penalty      Type C 3A      Core Flood                  351          CFT Vent      Take Penalty      Type C 3A,3B  Core Flood                  352          Sample/Bleed  Take Penalty      Type C 3B      Core Flood                  373          CFT M/U        Take Penalty      Type C 3B      Liquid Waste Disposal      339          RB Sump        Take Penalty      Type C 3B      Liquid Waste Disposal      349          RCDT Vent      Take Penalty      Type C 3B      Liquid Waste Disposal      374          RCDT Drain    Take Penalty      Type C 3A, 3B  Gas Waste Disposal          354          RCS Equipment  Take Penalty      Type C Vents 3C      Containment Monitoring      306          PASS          ILRT is Testing    Type C 3C      Containment Monitoring      315          RB Air Sample  ILRT is Testing    Type C 3C      Containment Monitoring      332          RB Air Sample  ILRT is Testing    Type C
____Return 3C      Containment Monitoring      356          RB Air Sample  ILRT is Testing    Type C Cntmnt. Mon.
3C      Containment Monitoring      376          Sample Return  ILRT is Testing    Type C 3A, 3B  Reactor Building Spray      340          RB SprayNormal        Standby    NR Sprayrmal      StandbyN/R 3A, 38  Reactor Building Spray      341          RB Spray      Normal Standby    N/R 3B      RB Press Sensing & Testing, 426          RB Press      ILRT is Testing    N/R IA                                      Sensing        ILRTisTestingN/R SP-178                                              Rev. 30                                      Page 78 of 207
 
ATTACHMENT 3 ILRT VALVE LINEUP INSTRUCTIONS L/U                                              PEN.                      APP. J  L/U  RESTORE ATTACH.
SYSTEM            PEN#            PEN    TEST STATUS      PRGM DESCRIPTION                    STATUS  SEQ. SEQ.
3B      RB Press Sensing & Testing, 442      RB Press        ILRT is Testing N/R IA                                  Sensing 3B      RB Press Sensing & Testing, 429      RB Press        ILRT is Testing N/R IA                                  Sensing 3B      RB Press Sensing & Testing, 319      RB Press        ILRT is Testing N/R IA                                  Sensing 38      Leak Rate & Post Accident    116    RB Leak Rate    Take Penalty    Type C H2 Purge                    116    RLaRe            aPnt          Te 3B      Leak Rate & Post Accident    121    RB Leak Rate,  ILRT is Testing Type C H2 Purge                    121    H2 Recombiner 3B      Leak Rate & Post Accident            RB Leak Rate,  ILRT is Testing H2 Purge                    122    H2 Recombiner                  Type C 3B      Leak Rate & Post Accident    125    H2 Recombiner  ILRT is Testing Type C H2 Purge                            Return Leak Rate & Post Accident 3B      H2 Purge                    202      RB Leak Rate    Take Penalty    Type C 3B      Leak Rate & Post Accident                            ILRT is Testing H2 Purge                    305    PASS                            Type C 3B      Leak Rate & Post Accident  306      PASS            ILRT is Testing Type C H2 Purge                    36        ASye 3A      Containment Purge            113    RB Purge Supply ILRT is Testing Type C 3A      Containment Purge          357      RB Purge        ILRT is Testing Type C
_________                  ______  Exhaust_                                        _  _ _ _  _
3A, 3B  Industrial Cooler          206      RBICW Supply    Take Penalty    Type C 3A, 3B  Industrial Cooler          207      RBICW Return    Take Penalty    Type C 3A, 3B  Industrial Cooler          366      RBICW Supply    Take Penalty    Type C 3A, 3B  Industrial Cooler          367      RBICW Return    Take Penalty    Type C SP-1 78                                          Rev. 30                                    Page 79 of 207
 
ATTACHMENT 3 ILRT VALVE LINEUP INSTRUCTIONS L/U                                                                    APP. J  L/U  RESTORE L/U                SYSTEM    PEN#,          PEN.      TEST STATUS    PRGM ATTACH.                                  DESCRIPTION        -          STATUS  SEQ. SEQ.
3A, 3B    Fire Service        430      FSW to CNTMNT  ILRT is Testing Type C 3A        RB Airlock          433      RB Personnel  Outer Door      Type B 3A___Ailoc                    _433________
Airlock        OPEN            Type B 3A I RB Airlock        I 222      RB Equipment I Hatch Airlock  Outer Door OPEN            Type B Type B SP-178                                        Rev. 30                                  Page 80 of 207
 
ATTACHMENT 3A ILRT VALVE LINEUPS PRIOR TO PRESSURIZATION SYSTEM: MAIN STEAM PEN. NO.: 105.106.107.201.314.316.318.320.427.428 Dwa: FD-302-Ohl Sht4 VALVE                VALVE                                            TEST                        RESTORED        TAG PULLED    IND. VERF.
NO. DESCRIPTION        PEN .#OATO                        TS NO.              DESCRIPTION                  LOCATION            LINEUP    INITIAL/DATE        POSITION      INITIAL/DATE  INIT/DATE Main Steam Line A2          105 MSV-297    Drain Trap Root                                      CLOSED                      OPEN Isolation MSV-411    Main Steam Line A2 Iso. 105                      CLOSED                      CLOSED Main Steam Line Al          106 MSV-299    Drain Trap Root                                      CLOSED                      OPEN Isolation.
Main Steam Supply          106                                                  If RCS < 270 -
MSV-55    EFP-2 Iso.                                          CLOSED                      CLOSED If RCS > 270' - OPEN MSV-412    RCSG Main Steam Line        106                      CLOSED                      CLOSED I  Al  Iso.
Main Steam Line B1          201 MSV-301    Drain Trap Root                                      CLOSED                      OPEN Isolation MSV-413    Main Steam Line B1 Iso. 201                      CLOSED                      CLOSED 106                                                  If RCS < 240&deg; -
MSV-27    Atmo. Dump Isolation                                CLOSED                      CLOSED I_                                                                                If RCS > 240' - OPEN 107                                                  IfRCS < 240&deg; -
MSV-28    Atmo. Dump Isolation                                CLOSED                      CLOSED If RCS > 240* - OPEN MSV-303    MSDT 25 Root Iso            107                      CLOSED                      OPEN MSV-56    Main Steam Supply          107                                                  IfRCS < 270&deg; -
EFP-2 Iso.                                          CLOSED                      CLOSED If RCS > 270&deg; - OPEN MSV-414    Main Steam Line B2 Iso. 107                      CLOSED                      CLOSED MSV-185    RCSG-1A Drain Iso.          318                      CLOSED                      LOCKED CLOSED MSV-130    RCSG-1A Drain Iso.          427                      CLOSED                      CLOSED MSV-148    RCSG-1B Drain Iso.          428                      CLOSED                      CLOSED MSV-93    MS 106 + MS 108 + MS        105                      OPEN                        OPEN 115 PT Isolation        1_-_I                            _IIII MSV-95    MS 111 +MS 113 + MS        201                      OPEN                        OPEN 116 PT Isolation        I                          IIII_          _r                                                  I  _I SP-178                                                    Rev. 30                                                        Page 81 of 207
 
ATTACHMENT 3A ILRT VALVE LINEUPS PRIOR TO PRESSURIZATION SYSTEM: MAIN STEAM PEN. NO.:    105.106.107.201.314.316.318.320.427.428                                                    Dwa! FD-302-0hl Sht4 VALVE    NO. VALVE DESCRIPTION      PEN .#      LOAINTS            TEST                        RESTORED    TAG PULLED    IND. VERF.
NO.          DESCRIPTION                  LOCATION          LINEUP    INITIAL/DATE        POSITION  INITIAL/DATE  INIT/DATE MSV-94    MS 107 + MS 109 + MS    106                        OPEN                        OPEN 114 PT Iso.
MSV-96    MS 110 + MS 112 + MS    107                        OPEN                        OPEN 117 PT Iso.
MSV-504  MS 107 + MS 109 PT      106 Iso.                                                OPEN                        OPEN MSV-508  MS 110 + MS 112 PT      107                        OPEN                        OPEN Iso.
MSV-505  Main Steam Line Al      106                        OPEN                        SEALED CLOSED Vent                                                UNCAPPED                    CAPPED (GAUGE INSTALLED)
MSV-509  Main Steam Line B2      107                        OPEN                        SEALED CLOSED Vent                                                UNCAPPED                    CAPPED (GAUGE INSTALLED)'
MSV-443  RCSG-1A Drain Iso.      318                        CLOSED                      CLOSED MSV-120  RCSG-1A Drain Iso.      318                        CLOSED                      CLOSED MSV-121  RCSG-1A Drain Iso.      318                        CLOSED                      CLOSED MSV-446  RCSG-1B Drain Iso.      314                        CLOSED                      CLOSED MSV-138  RCSG-1B Drain Iso.      314                        CLOSED                      CLOSED MSV-139  RCSG-1B Drain Iso.      314                        CLOSED                      CLOSED MSV-116  RCSG-lA Sec Vent        318                        CLOSED                      CLOSED MSV-117  N2 Supply to RCSG-1A    318                        CLOSED                      CLOSED MSV-400  Pen 318 Vent            318                        CLOSED                      CLOSED MSV-184  RCSG-1B to RB Sump      314                        CLOSED                      LOCKED Iso.                                                                            CLOSED MSV-115  RCSG-lA Sec Vent        318                        CLOSED                      SEALED CLOSED MSV-447  Main Steam Line A2      105                        CLOSED                      SEALED CLOSED Vent MSV-448  Main Steam Line Al      106                        CLOSED                      SEALED CLOSED Vent MSV-449  Main Steam Line B1      201                        CLOSED                      CLOSED I Vent                I        _                  I            I              II SP-1 78                                                  Rev. 30                                                Page 82 of 207
 
ATTACHMENT 3A ILRT VALVE LINEUPS PRIOR TO PRESSURIZATION SYSTEM: MAIN STEAM PEN. NO.: 105,106,107,201,314,316,318,320,427,428                                                Dwa: FD-302-011 Sht.4 VALVE  NO.      VALVE DESCRIPTION    PEN .#OATO                      TEST TS                      RESTORED    TAG PULLED    IND. VERF.
NO.          DESCRIPTION                LOCATION          LINEUP INITIAL/DATE      POSITION    INITIAL/DATE  INIT/DATE MSV-450  Main Steam Line B2    107                        CLOSED                CLOSED Vent MSV-1 34 N2 Supply to RCSG-1 B 320                        CLOSED                CLOSED MSV-135  N2 Supply to RCSG-1B  320                        CLOSED                SEALED CLOSED MSV-1 33 N2 Supply to RCSG-1 B 320                        CLOSED                CLOSED MSV-503  MS 106 + MS 108 PT    105                        SEALED                SEALED CLOSED &
Vent                                              CLOSED &              CAPPED CAPPED MSV-507  MS 111 + MS 113 PT    201                        SEALED                SEALED CLOSED &
Vent                                              CLOSED &              CAPPED CAPPED CGV-38  Main Steam Line A2    105                        LOCKED                LOCKED CLOSED Drain                                            CLOSED CGV-37  Main Steam Line Al    106                        LOCKED                LOCKED CLOSED Drain                                            CLOSED CGV-36  Main Steam Line B1    201                        LOCKED                LOCKED CLOSED Drain                                            CLOSED CGV-35  Main Steam Line B2    107                        LOCKED                LOCKED CLOSED Drain                                            CLOSED CGV-1    RCSG-1A Drain Iso To  318                        SEALED                SEALED CLOSED Chem CIng Sys                                    CLOSED SPA178                                                Rev. 30                                            Page 83 of 207
 
ATTACHMENT 3A ILRT VALVE LINEUPS PRIOR TO PRESSURIZATION SYSTEM: FEEDWATER & EMERGENCY FEEDWATER PEN. NO.: 108.109.423,424                                                            Dwa: FD-302-081. Shts 1. 3. & 4: FD-302-082 Sht 1 VALVE              VALVE NO.DECRPTONPEN              .#      LOCATION            TEST TS                              RESTORED      TAG PULLED    IND. VERF.
NO.            DESCRIPTION      PENLOCATIONLINEUP                              INITIAL/DATE        POSITION    INITIAL/DATE  INIT/DATE FWV-135    RCSG-1A Emerg          424                          CLOSED                        SEALED CLOSED Supply Drain FWV-134    RCSG-1A Emerg          424                          CLOSED                        SEALED CLOSED Supply Vent FWV-169    RCSG-1A Main Supply    423                          CLOSED                        SEALED CLOSED Drain                                                CAPPED                        & CAPPED FWV-85      RCSG-1A Main Supply    423                          CLOSED                        SEALED CLOSED Vent FWV-136    RCSG-1B Emerg          109                          CLOSED                        SEALED CLOSED Supply Drain FWV-137    RCSG-1B Emerg          109                          CLOSED                        SEALED Supply Vent                                                                        CLOSED FWV-86      RCSG-1B Main Supply    108                          CLOSED                        CLOSED Vent FWV-170    RCSG-1B Main Supply    108.                        CLOSED &                      SEALED Drain                                                CAPPED                        CLOSED & CAPPED SYSTEM: CONDENSATE & DEMINERALIZED WATER PEN. NO.: 117 VALVE NO.
DWV-161
*Ifa test flange has been installed for venting/draining/testing, installation of the test flange cap or flange installation requirement.
SP-1 78                                                      Rev. 30                                                      Page 84 of 207
 
ATTACHMENT 3A ILRT VALVE LINEUPS PRIOR TO PRESSURIZATION SYSTEM: SPENT FUEL COOLING IE L" & I II' jI      *J  '7  AO  A"'*
E~E*% ~    I~A ~      -~
r~r4l, i'lU.; ,'*,, 0*0, '0                                      __UW;                                        rIU-3U0-o2- I ant.
VALVE                    VALVE                                        TEST                        RESTORED  TAG PULLED      IND. VERF.
NO.                DESCRIPTION                                    LINEUP    INITIAL/DATE        POSITION  INITIAL/DATE    INIT/DATE
    ----      Transfer Tube Blind    436                        INSTALLED                  INSTALLED Flange, SFFG-436-2A
    ----      Transfer Tube Blind    348                        INSTALLED                  INSTALLED 1 Flange, SFFG-348-2A                                            I SFV-18        FTC Iso                347                        CLOSED                      LOCKED CLOSED Check that pipe caps or plugs are installed on the following taps:
NOTE:                Refer to FPC Dwg. No. P-304-723 for location of Test Taps for Fuel Transfer Tube flanges.
INITIALS Fuel Transfer Tube 3A Test Tap Inside RB Fuel Transfer Tube 3B Test Tap Inside RB SP-1 78                                                      Rev. 30                                                Page 85 of 207
 
ATTACHMENT 3A ILRT VALVE LINEUPS PRIOR TO PRESSURIZATION SYSTEM: REACTOR COOLANT PEN. NO.: N/A                                                                                                    Dwg: FD-302-651 Sht. 1 VALVE              VALVE                                            TEST                            RESTORED        TAG PULLED    IND. VERF.
NO.          DESCRIPTION      PEN #        LOCATION            LINEUP        INITIAL/DATE        POSITION      INITIAL/DATE  INIT/DATE RCV-6      Press N2 Supply/WD    N/A                            CLOSED                        OPEN Vent RCV-157    High Point Vent      N/A                            OPEN                          CLOSED RCV-138    Press Vent            N/A                            OPEN                          LOCKED OPEN (1)
RCV-158    High Point Vent      N/A                            OPEN                          CLOSED RCV-159    High Point Vent      N/A                            OPEN                          CLOSED RCV-18      RCSG-1A N2            N/A                            OPEN                          LOCKED OPEN Supply/WD Vent RCV-160    High Point Vent      N/A                            OPEN                          CLOSED RCV-163    High Point Vent      N/A                            OPEN                          CLOSED RCV-164    High Point Vent      N/A                            OPEN                          CLOSED RCV-41      RCSG-1B N2            N/A                            OPEN                          LOCKED OPEN I Supply/WD Vent (1) Normal High Dose area, consider alternate means to determine status of valve (camera, binoculars)
SYSTEM: MAKEUP & PURIFICATION PEN. NO.:377                                              Dwg: FD-302-661, Sheet 5 VALVE          D    IVALVE      PEN.#        LOCATION            TEST                          RESTORED        TAG PULLED    IND. VERF.
NO.          DESCRIPTION                                        LINEUP      INITIALDATE        POSITION      INITIAL/DATE    INIT/DATE MUV-418  Bleedoff Drain            377                          CLOSED &                      SEALED CAPPED                        CLOSED & CAPPED MUV-407  Bleedoff Vent              377                          CLOSED &                      SEALED I                                I          I                  I CAPPED                        CLOSED & CAPPED SP-178                                                        Rev. 30                                                        Page 86 of 207
 
ATTACHMENT 3A ILRT VALVE LINEUPS PRIOR TO PRESSURIZATION SYSTEM: LIQUID WASTE DISPOSAL PI:N i  *-
Kin ii  .
                "'ZQ "AQ -'q7A n    I n  -.
11M - 1MQ4I Qk
                                                                                                                                    ,.I IVL U 4 a VALVE                VALVE                                        TEST                      RESTORED            TAG PULLED          IND. VERF.
NO.            DESCRIPTION      PEN.#      LOCATION        LINEUP  INITIAUDATE        POSITION            INITIAUDATE          INIT/DATE WDV-60        RC Drain Tank Iso      349                      CLOSED                  CLOSED WDV-61        RC Drain Tank Iso      349                      CLOSED                  CLOSED WDV-94        RC Drain Tank Pump      374                      CLOSED                  CLOSED Iso WDV-62        RC Drain Tank Pump      374                      -CLOSED                  CLOSED Iso
      ----      Waste Gas Header    OP-412A                      OP-412A                OP-412A I Aux Bldg Exhaust  I          III NOTE: Perform core flood lineup prior to performing gas waste disposal lineup.
SYSTEM: GAS WASTE DISPOSAL PEN. NO.: 354                                                                                              Dwg.: FD-302-691          Sheet 3 VALVE                VALVE      PEN .#      LOCATION            TEST                      RESTORED            TAG PULLED          IND. VERF.
NO.            DESCRIPTION                                    LINEUP  INITIAUDATE        POSITION          INITIAUDATE          INIT/DATE WDV-406        RB Vent Header Iso    354                        CLOSED                  OPEN WDV-405        RB Vent Header Iso    354                        CLOSED                  OPEN SYSTEM: REACTOR BUILDING SPRAY PEN. NO.: 340,341                                                                                    Drawing:  FD-302-711          Sheet 1 VALVE              DVALVE          PEN .#      LOCATION            TEST                    RESTORED            TAG PULLED          IND. VERF.
NO.              DESCRIPTION                                      LINEUP  INITIAUDATE        POSITION          INITIAUDATE          INIT/DATE BSV-82      Pen 341 Drain & Test    341                        CLOSED                  LOCKED CLOSED BSV-4        RB Spray Header Iso    341                        CLOSED                  REMOTE/AUTO BSV-81      Pen 340 Drain & Test    340                        CLOSED                  LOCKED CLOSED BSV-3        RB Spray Header Iso    340                      1 CLOSED                  REMOTE/AUTO SP-178                                                      Rev. 30                                                      Page 87 of 207
 
ATTACHMENT 3A ILRT VALVE LINEUPS PRIOR TO PRESSURIZATION SYSTEM: LEAK RATE & POST ACCIDENT HYDROGEN PURGE PEN. NO.: 116.121.122.125.2D2.3D5.306                                                                Drawinv FD-302-722 ShAAt I VALVE NO.N 116 121    122 125 202 VALVE          VALVE/COMPONENT  PEN .#    LOCATION            TEST                      RESTORED        TAG PULLED    ND. VFDeR VERF.
NO.            DESCRIPTION                                  LINEUP  INITIAL/DATE      POSITION      INITIAL/DATE  INIT/DATE LRV-42          PI-1 Test            202                      CLOSED &                  CLOSED & CAPPED CAPPED LRV-43          PI-2 Test          202                        CLOSED &                  CLOSED & CAPPED CAPPED LRV-44          Press Sensing Inlet 202                        UNLOCKED                  LOCKED CLOSED OPEN LRV-39          PI-1 Inlet          202                        OPEN                      CLOSED LRV-40          PI-2 Inlet          202                      OPEN                      CLOSED LRV-41          PI-3 Inlet          202                      OPEN                      CLOSED LRV-45          FI-4 & FI-5 Inlet    116                      UNLOCKED                  LOCKED CLOSED CLOSED LRV-1 15        Test & Drain        202                        CLOSED &                  SEALED CAPPED                    CLOSED & CAPPED LRV-116        Test & Drain        116                      CLOSED &                  SEALED CAPPED                    CLOSED & CAPPED LRV-117        Test & Drain        116                      CLOSED                    SEALED CLOSED LRV-118        Test & Drain                                  SEALED                    SEALED 116                      CLOSED &                  CLOSED & CAPPED CAPPED LRV-130        Test Conn Pent 216  216                        CLOSED &                  SEALED CAPPED                    CLOSED & CAPPED LRV-131        Test Conn Pent 217                            CLOSED &                  SEALED 217                        CAPPED                    CLOSED & CAPPED LRFG-1-1B      LRX-1 (Line Blind)  122                      INSTALLED                INSTALLED LRFG-122-2A    Atmos. Vent inside  122                      REMOVED                  REMOVED RB 8" Flange LRFG-121-2A    FMR Pressurization  121                      REMOVED                  REMOVED Line 8" Flange      !21 LRFG-125-2A    Tertiary Depress    125                      REMOVED                  REMOVED Path 8" Flange LRFG-202-2A    ILRT Pressure                                  REMOVED                  INSTALLED Sensing, 2"        202 I Flange/Blind                                              I SP-178                                                    Rev. 30                                                  Page 88 of 207
 
ATTACHMENT 3A ILRT VALVE LINEUPS PRIOR TO PRESSURIZATION SYSTEM: LEAK RATE & POST ACCIDENT HYDROGEN PURGE I m*    AAA IAA  Am      A A I"I-N. Nu.:                              _,_,_,_,__-__,L                                                D rawin l-U-3U0-(22, Shleet 1 VALVE      VALVE/COMPONENT  PEN.#            LOCATION            TEST                    RESTORED        TAG PULLED    IND. VERF.
NO.          DESCRIPTION                                        LINEUP INITIAL/DATE      POSITION        INITIALDATE  INIT/DATE LRFG-1 16-2A  ILRT Verification                                    REMOVED                REMOVED Test Flow Line, 2"  116 Flange LRFG-305-2B    Mini-Purge, 6"      305                              REMOVED                REMOVED Flange LRFG-306-2B    Mini-Purge, 6"      306                              REMOVED                REMOVED Flange LRFG-216-2C    2005 ILRT                                            REMOVED                INSTALLED Pressurization Path 216 1 12" Flange/Blind LRFG-217-2C    2005 ILRT                                            REMOVED                INSTALLED Pressurization Path 217 12" Flange/Blind SP-1.78                                                        Rev. 30                                                Page 89 of 207
 
ATTACHMENT 3A ILRT VALVE LINEUPS PRIOR TO PRESSURIZATION SYSTEM: CONTAINMENT PURGE
                                                                                                    .  .    ........          A m    J PEN. NO.: 113,357                                                                                  Drawing: FID-30Z-751, Sheet 1 VALVE              VALVE        PEN .#      LOCATION            TEST TS                      RESTORED          TAG PULLED        IND. VERF.
NO.            DESCRIPTION                                    LINEUP INITIAL/DATE      POSITION        INITIAL/DATE      INIT/DATE AHV-1A    Purge Exhaust          357                        CLOSED                  *OPEN/CLOSED AHV-1 B  Purge Exhaust          357                        CLOSED                  *OPEN/CLOSED AHV-1 C  Purge Supply            113                        CLOSED                  *OPEN/CLOSED AHV-1D    Purge Supply            113                        CLOSED                  *OPEN/CLOSED AHV-25    Test Connection AHV-1A  357                        OPEN,                  SEALED CLOSED &
          & AHV-1B                                          UNCAPPED                CAPPED GAUGE INSTALLED AHV-24    Test Connection AHV-1D  113                        OPEN,                  SEALED CLOSED &
          &                                                  UNCAPPED                CAPPED AHV-1C                                            GAUGE I _INSTALLED
*Open only for RB Purge per OP-417. Shall not be open in Modes 1 thru 4.
SP-178                                                  Rev. 30                                                      Page 90 of 207
 
ATTACHMENT 3A ILRT VALVE LINEUPS PRIOR TO PRESSURIZATION SYSTEM: INDUSTRIAL COOLER R  m    Um AAA IAA Am        d m PEN. NO.: 206,207,366,367                                                                          Drawing: FDU-3U0-762 Sheet 4 VALVE                VALVE        PEN.#      LOCATION            TEST                    RESTORED          TAG PULLED    IND. VERF.
NO.              DESCRIPTION                                  LINEUP INITIAL/DATE      POSITION        INITIAL/DATE  INIT/DATE CIV-35    Outlet Iso              367                        CLOSED                *OPEN/CLOSED CIV-97    AHHE-14A Drain          367                        CLOSED                SEALED CLOSED CIV-90    AHHE-14A Vent            367                        CLOSED                SEALED CLOSED CIV-98    AHHE-14A Drain          366                        CLOSED                SEALED CLOSED CIV-34    Inlet Iso                366                        CLOSED                *OPEN/CLOSED CIV-40    Outlet Iso              207                        CLOSED                *OPEN/CLOSED CIV-95    AHHE-14B Drain          207                        CLOSED                SEALED CLOSED CIV-91    AHHE-14B Vent            206                        CLOSED                SEALED CLOSED CIV-96    AHHE-14B Drain          206                        CLOSED                SEALED CLOSED CIV-41    Inlet Iso                206                        CLOSED                *OPEN/CLOSED
*Open if associated cavity pump is in service.
SP-178                                                  Rev. 30                                                  Page 91 of 207
 
ATTACHMENT 3A ILRT VALVE LINEUPS PRIOR TO PRESSURIZATION SYSTEM: REACTOR BUILDING AIRLOCKS PEN NO.: N/A VALVE      VALVE DESCRIPTION  PEN .#      LOCATION          TEST LEUP        INITIAUDATE    RESTORED POSITION    TAG PULLED    IND. VERIF.
NO.                                                        LINEUP                                          INITIAUDATE  INITIAUDATE RAX-1          Inner Door          433                        CLOSED                      CLOSED RAX-1        Outer Door          433                        OPEN                        CLOSED RAX-2          Inner Door          222                        CLOSED                      CLOSED RAX-2        Outer Door          222                        OPEN                        CLOSED
* Outer Door can be closed, and airlock pressurized to test pressure -0.5 psig if snooping inner door seals/equalizing valves (handwheel packing glands indicates leakage.
SP-178                                                    Rev. 30                                                      Page 92 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: MAIN STEAM DIM=      m**    1Nr 1inn 1n7 9n1 "1A *.I "IR "9gn A97 A92                                                              mmnri znlAfl3lni        Qk*      A F
m    *.6  l.. *V
              .  .v  9I  y  .I -.
V  d. *rS.V Il*l
* i      *m    "irS *IJ "*                                            V    ,  i..  -,.* .-  I I  L.l l."
VALVE                VALVE NO.DECRPTONPEN                                                TEST                      RESTORED    TAG PULLED          IND. VERF.
                                                  #      LOCATION            TS NO.            DESCRIPTION                                          LINEUP INITIAL/DATE        POSITION  INITIAL/DATE        INIT/DATE MSV-409          Drain & Test Pen 316        316                        CLOSED &
* OPEN / OR CAPPED                  SEALED CLOSED &
CAPPED MSV-114          RCSG-lA Sec Vent            316                        LOCKED                  LOCKED CLOSED CLOSED MSV-410          RCSG-1B Test &              320                        CLOSED &
* OPEN / OR Drain                                                  CAPPED                  SEALED CLOSED &
CAPPED MSV-132          RCSG-1B Sec Vent            320                        LOCKED                  LOCKED CLOSED CLOSED MSV-401          Drain & Test Pen 318        318                        CLOSED  &              SEALED CAPPED                  CLOSED & CAPPED MSV-128          RCSG-1B Drain To            318                        LOCKED                  LOCKED CLOSED Misc Waste Tank                                        CLOSED MSV-403          RCSG-1A To Atmos            427                        SEALED                  SEALED Drain Tank Vent                                        CLOSED  &              CLOSED & CAPPED CAPPED MSV-404          Drain & Test Pen 314        314                        CLOSED  &              SEALED CAPPED                  CLOSED & CAPPED MSV-146          RCSG-1B Drain To            314                        LOCKED                  LOCKED CLOSED Misc Waste Tank                                        CLOSED MSV-406          RCSG-1 B To Atmos            428                        SEALED                  SEALED Drain Tank Vent                                        CLOSED  &              CLOSED & CAPPED CAPPED MSV-405          Drain & Test Pen 428        428                        CLOSED  &              SEALED
                                                                          .CAPPED                  CLOSED & CAPPED MSV-402          Drain & Test Pen 427        427                        SEALED                  SEALED CLOSED  &              CLOSED& CAPPED CAPPED
* OPEN if N2 Required on OTSG SP-178                                                                  Rev. 30                                                  Page 93 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: FEEDWATER & EMERGENCY FEEDWATER pr:MI K  IanR iN    All AIA                                          AAR    , c. %fl...2flnfl Qkf L- i z A. cfl.2fl,)fl)    Qkf    I VALVE          VALVE            PEN #      LOCATION        TEST                          RESTORED      TAG PULLED    IND. VERF.
NO.        DESCRIPTION                                    LINEUP  INITIAL/DATE            POSITION      INITIAL/DATE  INIT/DATE FWV-138  Pen 109 Drain & Test    109                    SEALED                    SEALED CLOSED CLOSED FWV-163  RCSG-1B Main            108                    CLOSED                    CLOSED Supply Vent EFV-69  EFW RCSG-1A Vent        424                    CLOSED                    CLOSED FWV-132  Drain & Test Pen 424    424                    CLOSED &                  SEALED CLOSED      &
CAPPED                    CAPPED FWV-171  Drain & Test Pen 423    423                    CLOSED &                  SEALED CLOSED      &
CAPPED                    CAPPED FWV-1 11 Drain & Test Pen 108    108                    CLOSED &                  SEALED CLOSED      &
CAPPED                    CAPPED FWV-1 12 Drain & Test Pen 423    423                    CLOSED                    CLOSED FWV-205  Drain & Test Pen 424    424                    CLOSED    &                SEALED CLOSED      &
CAPPED                    CAPPED FWV-206  Pen 424 Vent            424                    CLOSED    &                SEALED CLOSED      &
CAPPED                    CAPPED FWV-203  Drain & Test Pen 109    109                    CLOSED    &                SEALED CLOSED      &
CAPPED                    CAPPED FWV-204  Pen 109 Vent            109                    CLOSED    &                SEALED CLOSED      &
CAPPED                    CAPPED CGV-17  Chem Clean A OTSG        424                    SEALED                    SEALED CLOSED CLOSED CGV-18  Chem Clean B OTSG        109                    SEALED                    SEALED CLOSED CLOSED EFV-68  Vent & N2 Blanket Iso. 424                    CLOSED                    SEALED CLOSED EFV-72  EF to SG 3A Drain        424                    CLOSED                    CLOSED EFV-62  EF to SG 3B Drain        109                    CLOSED                    CLOSED EFV-65  EF to SG 3B Drain        109                    CLQSED                    CLOSED EFV-61  Vent & N2 Blanket Iso. 109                    CLOSED                    SEALED CLOSED EFV-1 1  Emer FW to OTSG 3A 424                          CLOSED                    AUTO Iso.                  I EFV-14  Emer FW to OTSG 3A 424                          CLOSED                    AUTO Iso.
EFV-32  Emer FW to OTSG 3B      109                    CLOSED                    AUTO SP-1 78                                                  Rev. 30                                                        Page 94 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: FEEDWATER & EMERGENCY FEEDWATER PEN. NO.: 108,109,423,424                                        Dwgs: FD-302-081 Sht.s 1, 3, & 4; FD-302-082 Sht. 1 VALVE NO. NO    I    VALVE DECRPTONPEN DESCRIPTION    #      LOCATION          TEST TS LINEUP  INITIAUDATE RESTORED POSITION TAG PULLED INITIAUDATE IND. VERF.
INIT/DATE ISO.
EFV-33    Emer FW to OTSG 3B  109                    CLOSED                  AUTO SYSTEM: CONDENSATE & DEMINERALIZED WATER PEN. NO.: 117                                                                                  Dw .: FD-302-182 Sht.      3 TAG        IND.
VALVE            VALVE                                  TEST    NITIAL/DA      RESTORED          PULLED      VERF.
NO.          DESCRIPTION                              LINEUP                    POSITION      INITIAL/DA  INIT/DAT TE                              TE          E DWV-160  Demin Water Iso    117                    CLOSED                  CLOSED SP-178                                              Rev. 30                                                Page 95 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: NUCLEAR SERVICES CLOSED CYCLE COOLING piFp  pMA 29z1 %772Afn %r%1 qzn fl    z21R 2AJQ  Zr%. 2ArQ 17Al 271 '%7r '17r 2A2' '4r% '17A 292' q2~r qA    flAn  a il..2fl94rfl1    -qh+
VALVE          VALVE        PEN #        LOCATION            TEST TS                              RESTORED      TAG PULLED    IND. VERF.
NO.        DESCRIPTION                                        LINEUP      INITIAL/DATE        POSITION      INITIALDATE    INIT/DATE SWV-50    Letdown CIr 3A/3C    361                          CLOSED                        OPEN Return Iso SWV-49    Letdown Cooler 3B    322                          CLOSED                        OPEN Return Iso SWV-48    Letdown Cooler 3B    321                          CLOSED                        OPEN Supply Iso SWV-47    Letdown CIr 3A/3C    360                          CLOSED                        OPEN Supply Iso SWV-109    CRDMS Supply Iso      330                          CLOSED                        OPEN SWV-110    CRDMS Return Iso      331                          CLOSED                        OPEN SWV-86    RCP-1C Return Iso    326                          CLOSED                        OPEN SWV-82    RCP-1C Supply Iso    325                          CLOSED                        OPEN SWV-85    RCP-1D Return Iso    363                          CLOSED                        OPEN SWV-81    RCP-1D Supply Iso    362                          CLOSED                        OPEN SWV-84    RCP-1A Return Iso    324                          CLOSED                        OPEN SWV-80    RCP-1A Supply Iso    323                          CLOSED                        OPEN SWV-83    RCP-1B Return Iso    365                          CLOSED                        OPEN SWV-79    RCP-1 B Supply Iso    364                          CLOSED                        OPEN SWV-35    RB Vent Fan  3A      368                          CLOSED                        OPEN Supply Iso SWV-41    RB Vent Fan  3A      369                          CLOSED                        *OPEN/CLOSED Return Iso SWV-37    RB Vent Fan  3B      370                          CLOSED                        OPEN Supply Iso SWV-43    RB Vent Fan  3B      371                          CLOSED                        *OPEN/CLOSED Return Iso SWV-39    RB Vent Fan  3C      358                          CLOSED                        OPEN Supply Iso SWV-45    RB Vent Fan  3C      359                          CLOSED                        *OPEN/CLOSED Return Iso
*Valve must be open when associated fan is running.
SP-178                                                      Rev. 30                                                        Page 96 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: SPENT FUEL COOLING PEN. NO.: 347, 348, 436 Dwg:  FD-302-621 Sht. 3 VALVE  NO.DE VALVE CRPTONPEN #          LOCATION        TEST TS                      RESTORED  TAG PULLED    IND. VERF.
NO.        DESCRIPTION                              LINEUP  INITIAUDATE      POSITION  INITIAL/DATE  INIT/DATE SFV-140  Transfer Tube Gasket  348                  CLOSED                  CLOSED Drain SFV-141  Transfer Tube Gasket  436                  CLOSED                  CLOSED Drain SFV-142  Transfer Tube  Test  348                  CLOSED                  CLOSED SFV-143  Transfer Tube  Test  436                  CLOSED                  CLOSED SFV-144  Transfer Tube  Test  348                  CLOSED                  CLOSED SFV-145  Transfer Tube  Test  436                  CLOSED                  CLOSED SFV-19  FTC Iso              347                  CLOSED                  LOCKED CLOSED SFV-1 32 Pen 347  Drain & Test 347                  SEALED                  SEALED CLOSED CLOSED &                & CAPPED CAPPED SFV-190  Pen 347 Drain & Test  347                  SEALED                  SEALED CLOSED CLOSED                  & CAPPED
                                                    & CAPPED SP-1 78                                            Rev. 30                                              Page 97 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: DECAY HEAT REMOVAL
                                                                                                          *    *AA  A i
* AI d  A PEN. NU.: 329                                                                                          J: ID-3U0-U41, Sht. 3 WC VALVE            VALVE        PEN #      LOCATION          TEST                      RESTORED      TAG PULLED      IND. VERF.
NO.          DESCRIPTION                                  LINEUP    INITIAUDATE      POSITION    INITIAUDATE      INIT/DATE DHV-91    DH to Press Iso        329                    CLOSED                    CLOSED DHV-95    Pen 329 Drain & Test  329                    SEALED                    SEALED CLOSED CLOSED DHV-127    Pen 329 Drain & Test  329                    SEALED                    SEALED CLOSED &
CLOSED &                  CAPPED CAPPED DHV-128    Pen 329 Drain & Test  329                    SEALED                    SEALED CLOSED &
CLOSED &                  CAPPED CAPPED
*A nitrogen pressure of approximately 20 PSIG may be connected to aid in draining.
SP-178                                                  Rev. 30                                                  Page 98 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: MAKEUP & PURIFICATION MA M mA m F'IN. NU.:  333, 336, 337, 338, 353, 377, 434, 435                                              DW, FD-302-661 Sht. 5 VALVE            VALVE                                    TEST                    RESTORED      TAG PULLED    IND. VERF.
NO.          DESCRIPTION                                LINEUP INITIAL/DATE      POSITION      INITIAL/DATE  INIT/DATE MUV-276    Letdown Cooler Vent    333                  CLOSED &                SEALED CAPPED                  CLOSED & CAPPED MUV-49    Letdown Cooler Iso    333                  CLOSED                  OPEN/CLOSED (5)
MUV-268    Pen 333"Drain & Test  333                  SEALED                  SEALED CLOSED CLOSED &                & CAPPED CAPPED MUV-537    Pen 333 Drain & Test  333                  SEALED                  SEALED CLOSED CLOSED &                & CAPPED CAPPED MUV-567    Letdown Inside        333                  CLOSED                  OPEN Containment Isolation (MCB)
MUV-543    HPI to RB Sump        353                  CLOSED                  CLOSED (Note 3)
Solenoid Valve MUV-545    HPI to RB Sump        353                  CLOSED                  CLOSED (Note 4)
Solenoid Valve MUV-539    HPI to RB Sump Aux. 353                  OPEN                    LOCKED OPEN Bldg. Maintenance Valve MUV-548    HPI to RB Sump Drain  353                  CLOSED &                SEALED CAPPED                  CLOSED & CAPPED MUV-561    HPI to RB Sump AB      353                  CLOSED &                SEALED CLOSED &
Vent                                        CAPPED                  CAPPED MUV-547    HPI to RB Sump Vent    353                  CLOSED &                SEALED CLOSED &
CAPPED                  CAPPED MUV-269    Pen 377 Drain & Test  377                  SEALED                  SEALED CLOSED CLOSED                  & CAPPED
                                                        & CAPPED_
MUV-261    RCP-1D Bleedoff Iso    377                  CLOSED                  OPEN/CLOSED (5)
MUV-260    RCP-1C Bleedoff Iso    377                  CLOSED                  OPEN/CLOSED (5)
MUV-259    RCP-1B Bleedoff Iso    377                  CLOSED                  OPEN/CLOSED (5)
MUV-258    RCP-1A Bleedoff Iso    377                  CLOSED                  OPEN/CLOSED (5)
MUV-253    Bleedoff Iso          377                  CLOSED                  OPEN/CLOSED (5)
MUV-538    Pen 377 Drain & Test  377                  SEALED                  SEALED CLOSED SP-1 78                                              Rev. 30                                                  Page 99 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: MAKEUP & PURIFICATION F1LN. NU.: 333, 336, 337, 338, 353, 377, 434, 435                                                                                  Dw    FD-302-661 Sht. 5 VALVE                  VALVE              PEN #          LOCATION                TEST                              RESTORED          TAG PULLED      IND. VERF.
NO.              DESCRIPTION                                                  LINEUP        INITIAL/DATE        POSITION          INITIAL/DATE    INIT/DATE CLOSED                            & CAPPED
                                                                                & CAPPED MUV-18          RCP Seal Iso                  338                            CLOSED                            OPEN MUV-23          HPI Loop A                    434                            CLOSED                            CLOSED MUV-24          HPI Loop A                    435                            CLOSED                            CLOSED MUV-27          Loop A Makeup Iso            435                            CLOSED                            OPEN MUV-25          HPI Loop B                    336                            CLOSED                            CLOSED MUV-26          HPI Loop B                    337                            CLOSED                            CLOSED INO I ES: 1. valve electrical power UN -. uru  -8A, Switch 4 LOLSEU    3. valve electrical power OF- - !PDU--A,Switch 4 OPEN      5. OPEN when in service;
: 2. Valve electrical power ON - DPDP-8B, Switch 8 CLOSED 4. Valve electrical power OFF - DPDP-8A, Switch 8 OPEN            CLOSED when NOT in service.
** Two of three letdown coolers in service.
*Nitrogen/Air may be used, if assist draining. Refer to SP-179C, CONTAINMENT LEAKAGE TEST-TYPE "C", Enclosure 16 for guidance.
SP-178                                                                    Rev. 30                                                                  Page 100 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: LIQUID SAMPLING PEN. NO.: 425,439.440,441                                                                    Dwa.: FD-302-672. Sheet 1 VALVE          VALVE      PEN #      LOCATION          TEST                    RESTORED          TAG PULLED  IND. VERF.
NO.        DESCRIPTION                                LINEUP INITIAL/DATE      POSITION        INITIALIDATE  INIT/DATE CAV-133    Pen 439 Drain &    439                    CLOSED                  SEALED Test                                      **FLANGE                CLOSED & FLANGED INSTALLED CAV-126    RC Letdown Sample  439                    CLOSED                  CLOSED CAV-1      PZR Steam Space    439                    CLOSED                  CLOSED Sample CAV-3      PZR Water Space    439                    CLOSED                  CLOSED Sample CAV-2      Sample Iso        439                    CLOSED                  CLOSED CAV-619    Pen 439 Test Conn. 439                    CLOSED &                SEALED CAPPED                  CLOSED & CAPPED CAV-622    Pen 439 Test Conn  439                    CLOSED &                SEALED CAPPED                  CLOSED & CAPPED CAV-4      SG 3A Sample Iso  440                    CLOSED                  CLOSED CAV-154    Pen 440 Drain &    440                    CLOSED &                SEALED Test                                      *FLANGE                  CLOSED & FLANGED INSTALLED CAV-6      SG 3A Sample Iso  440                    CLOSED                  CLOSED CAV-5      SG 3B Sample Iso  441                    CLOSED                  CLOSED CAV-155    Pen 441 Drain &    441                    CLOSED &                SEALED Test                                      *FLANGE                  CLOSED & FLANGED INSTALLED CAV-7      SG 3B Sample Iso  441                    CLOSED                  CLOSED CAV-433    RB Sump Sample    425                    CLOSED                  CLOSED PWR/OFF Iso CAV-434    RB Sump Sample    425                    CLOSED                  CLOSED PWR/OFF Iso CAV-435    Pass Iso          425                    CLOSED                  CLOSED PWR/OFF CAV-436    Pass Iso          425                    CLOSED                  CLOSED PWR/OFF CAV-429    RCP-1A Disch Iso  439                    CLOSED                  CLOSED PWR/OFF CAV-430    RCP-1C Suction    439                    CLOSED                  CLOSED PWR/OFF Sami~le Iso CAV-431    Sample Iso        439                    CLOSED                  CLOSED SP-178                                              Rev. 30                                                    Page 101 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: LIQUID SAMPLING PEN. NO.: 425,439,440,441                                                                                    Dwq.: FD-302-672, Sheet 1 VALVE              VALVE                                      TEST                          RESTORED          TAG PULLED  IND. VERF.
NO.            DESCRIPTION    PE__OCTO                      LINEUP      INITIAUDATE        POSITION          INITIAUDATE  INIT/DATE CAV-432          Sample Iso          439                        CLOSED                      CLOSED PWR/OFF CAV-725          Pen. 425 Drain &    425                        SEALED                      SEALED CLOSED &
Test                                          CLOSED                        CAPPED
                                                                  & CAPPED CAV-730          Pen. 425 Drain &    425                        SEALED                      SEALED CLOSED &
Test                                          CLOSED                        CAPPED
                                                                  & CAPPED CAV-726          Pen. 425 Drain &    425                        SEALED                      SEALED CLOSED &
Test                                          CLOSED                        CAPPED
                                                                  & CAPPED CAV-731          Pen. 425 Drain &    425                        SEALED                      SEALED CLOSED &
Test                                          CLOSED                        CAPPED
                                                                & CAPPED CAV-727          Pen. 439 Drain &    439                        SEALED                      SEALED CLOSED &
Test                                          CLOSED                        CAPPED
                                                                  & CAPPED CAV-732          Pen. 439 Drain &    439                        SEALED                      SEALED CLOSED &
Test                                          CLOSED                        CAPPED
                                                                  & CAPPED CAV-733          Pen. 440 Drain &    440                        SEALED                      SEALED CLOSED &
Test                                          CLOSED                      CAPPED
                                                                  & CAPPED CAV-734          Pen. 441 Drain &    441                        SEALED                      SEALED CLOSED &
Test                                          CLOSED                      CAPPED I_                                                & CAPPED
* A nitrogen pressure of approximately 20 PSIG may be used to aid in draining
**If a test flange has been installed for venting/draining/testing, removal of the test flange cap or plug will satisfy flange removal requirement and installation of test flange cap or plug will satisfy the flange installation requirement.
SP-178                                                        Rev. 30                                                          Page 102 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: LIQUID WASTE DISPOSAL
* AAA AA J  AI    d rr"N. NU.:                                                                                          UWg.: 'U-30U-t81 Sneet 1 uw,.3',4,4 VALVE              VALVE                                      TEST                    RESTORED            TAG PULLED    IND. VERF.
NO      D S RI TI NPEN    #      LOCATION          T S NO.            DESCRIPTION                                  LINEUP INITIAL/DATE      POSITION          INITIAL/DATE  INIT/DATE WDV-807    Pen 349 Drain & Test  349                    CLOSED &                SEALED CAPPED                  CLOSED & CAPPED WDV-808    Pen 374 Drain & Test  374                    SEALED                  SEALED CLOSED CLOSED                  & CAPPED
                                                          & CAPPED WDV-3      RB Sump Pump Iso      339          MCB        CLOSED                  OPEN WDV-809    Pen 339 Drain & Test  339                    SEALED                  SEALED CLOSED CLOSED                  & CAPPED
                                                            & CAPPED WDV-4      RB Sump Pump Iso      339          MCB        CLOSED                  OPEN WDV-810    WDV-4 Downstream      339                    OPEN,                    CLOSED Vent (RB Sump Disch                            UNCAPPED Vent)                                          GAUGE INSTALLED WDV-1242  WDV-4 Downstream      339                    CLOSED                  OPEN Isolation (RB Sump Manual Iso)
NOTE: Perform core flood lineup prior to performing gas waste disposal lineup.
SYSTEM: GAS WASTE DISPOSAL PEN. NO.: 354                                                                                    Drawing: FD-302-691 Sheet 3 VALVE              VALVE                                      TEST                    RESTORED            TAG PULLED    IND. VERF.
NO      DSRITINPEN        #      LOCATION          TS NO.            DESCRIPTION                                  LINEUP INITIAL/DATE      POSITION          INITIAL/DATE  INIT/DATE WDV-371    Pen 354 Drain & Test  354                    CLOSED &                SEALED CAPPED                  CLOSED & CAPPED WDV-1022                          354          MCB        OPEN                    CLOSED SP-1 78                                                Rev. 30                                                      Page 103 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: RB PRESSURE SENSING & TESTING / INSTRUMENT AIR DlkI      kllf%*
* 40    An)C  An'nr AAq)                                                                                r% OnOl 7412 0"          4 li-I      IF1..    .. I ;,  ILU*  *lf0  *l'                                                                  iJ dW IIl . r-J-,U      .I  I q,*llI*tL  I VALVE                      VALVE                VENT                          TEST                    RESTORED            TAG PULLED    IND. VERF.
NO.                    DESCRIPTION            LINEUP    INITIAL/DATE      LINEUP  INITIAL/DATE      POSITION          INITIAL/DATE    INIT/DATE IAV-725            Instrument Air Isolation    CLOSED                        CLOSED                  OPEN Valve to Cabinet ESPSC-3B1 IAV-726            Instrument Air Isolation    CLOSED                        CLOSED                  OPEN Valve to Cabinet ESPSC-3B1 IAV-727            Instrument Air Isolation    CLOSED                        CLOSED                  OPEN Valve to Cabinet ESPSC-3A1 IAV-728            Instrument Air Isolation    CLOSED                        CLOSED                  OPEN Valve to Cabinet ESPSC-3A1 BSV-147            Pen 426 Iso.                LOCKED OPEN                  LOCKED OPEN              LOCKED OPEN BSV-64              BS-17-PT Iso.                LOCKED OPEN                  LOCKED OPEN              LOCKED OPEN BSV-254            Isolation Valve for BS-      SEALED OPEN                  SEALED OPEN              SEALED OPEN 91-PT BSV-255            Isolation Valve for BS-      SEALED OPEN                  SEALED OPEN              SEALED OPEN 93-PT BSV-241            Isolation Valve for BS-      SEALED OPEN                  SEALED OPEN              SEALED OPEN 91-PT BSV-252            Isolation Valve for BS-      SEALED OPEN                  SEALED OPEN              SEALED OPEN 17-PT BSV-236            BS-91-PT Test Valve          SEALED                        SEALED                  SEALED CLOSED CLOSED AND                    CLOSED AND              AND CAPPED CAPPED                        CAPPED BSV-237            BS-93-PT Test Valve          SEALED                        SEALED                  SEALED CLOSED CLOSED AND                    CLOSED AND              AND CAPPED CAPPED                        CAPPED BSV-238            BS-17-PT Test Valve          SEALED                        SEALED                  SEALED CLOSED CLOSED AND                    CLOSED AND              AND CAPPED CAPPED                        CAPPED BSV-229            BS-18-PS Isolation          SEALED OPEN                  SEALED OPEN              SEALED OPEN Valve                      I              I              I SP-1 78                                                                  Rev. 30                                                        Page 104 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: RB PRESSURE SENSING & TESTING / INSTRUMENT AIR PFMP N  wl '410 A92  A90 AA9                                                                  n r-%;% n    fl74 lnl      '3 Qk+
* VALVE          VALVE            VENT                        TEST                    RESTORED        TAG PULLED      IND. VERF.
NO.        DESCRIPTION          LINEUP    INITIAL/DATE      LINEUP  INITIAl/DATE      POSITION      INITIAL/DATE    INIT/DATE BSV-242  BS-24-PS Isolation    SEALED OPEN                  SEALED OPEN              SEALED OPEN Valve BSV-243  BS-59-PS Isolation    SEALED OPEN                  SEALED OPEN              SEALED OPEN Valve BSV-230  BS-21-PS Isolation    SEALED OPEN                  SEALED OPEN              SEALED OPEN Valve BSV-248  BS-27-PS Isolation    SEALED OPEN                  SEALED OPEN              SEALED OPEN Valve BSV-181  Reactor Building      CLOSED                      CLOSED                  SEALED CLOSED Pressure Switch (BS-59-PS) Cntnmnt Boundary Isolation Valve BSV-182  Reactor Building      OPEN                        CLOSED                  SEALED CLOSED Pressure Switch (BS-59-PS) Cntnmnt Boundary Isolation Valve BSV-183  Reactor Building      UNCAPPED                    UNCAPPED                CLOSED AND Pressure Switch (BS-  AND OPEN                    AND OPEN                CAPPED 59-PS) Instrument Air Test Valve BSV-184  Reactor Building      CLOSED                      CLOSED                  SEALED CLOSED Pressure Switch (BS-24-PS) Cntnmnt Boundary Isolation Valve BSV-185  Reactor Building      OPEN                        CLOSED                  SEALED CLOSED Pressure Switch (BS-24-PS) Cntnmnt Boundary Isolation Valve BSV-186  Reactor Building      UNCAPPED                    UNCAPPED                CLOSED AND Pressure Switch (BS-  AND OPEN                    AND OPEN                  CAPPED 24-PS) Instrument Air Test Valve SP-178                                                Rev. 30                                                      Page 105 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: RB PRESSURE SENSING & TESTING / INSTRUMENT AIR D=M    Nl. w140      AIR    A'30 AAk                                                                                Or%1nl)741)        a"        4 I I1  *  . .    / B  r,  v  r    " "I.                                                                        "!inL aIvvIII  . rl    , D .,  Iow      a VALVE                  VALVE              VENT                          TEST                  RESTORED              TAG PULLED      IND. VERF.
NO.              DESCRIPTION              LINEUP    INITIAL/DATE      LINEUP INITIAL/DATE      POSITION            INITIAL/DATE      INIT/DATE BSV-187        Reactor Building          CLOSED                        CLOSED                  SEALED CLOSED Pressure Switch (BS-18-PS) Cntnmnt Boundary Isolation Valve BSV-188        Reactor Building          OPEN                          CLOSED                  SEALED CLOSED
              -Pressure Switch (BS-18-PS) Cntnmnt Boundary Isolation Valve BSV-189        Reactor Building          UNCAPPED                      UNCAPPED                CLOSED AND Pressure Switch (BS-      AND OPEN                    AND OPEN                CAPPED 18-PS) Instrument Air Test Valve BSV-190        Reactor Building          CLOSED                        CLOSED                  SEALED CLOSED Pressure Switch (BS-27-PS) Cntnmnt Boundary Isolation Valve BSV-191      Reactor Building          OPEN                          CLOSED                  SEALED CLOSED Pressure Switch (BS-27-PS) Cntnmnt Boundary Isolation Valve BSV-192      Reactor Building          UNCAPPED                      UNCAPPED                CLOSED AND Pressure Switch (BS-      AND OPEN                    AND OPEN                CAPPED 27-PS) Instrument Air Test Valve BSV-193      Reactor Building          CLOSED                        CLOSED                  SEALED CLOSED Pressure Switch (BS-21-PS) Cntnmnt Boundary Isolation Valve SP-178                                                            Rev. 30                                                          Page 106 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: RB PRESSURE SENSING & TESTING / INSTRUMENT AIR DlkI  kl6%      1"4n  A")C    A"10  AA)                                                                            r% 12n,2 74-2 0"          6 It I1,.. -r_.,Ipy  .IU            ,..                                                              I, lo dWIIl*. I- J U.I    I"us I    l    I VALVE                  VALVE                VENT                        TEST                    RESTORED          TAG PULLED      IND. VERF.
NO.                DESCRIPTION            LINEUP    INITIAL/DATE      LINEUP  INITIAL/DATE      POSITION          INITIAL/DATE      INIT/DATE BSV-194        Reactor Building          OPEN                        CLOSED                  SEALED CLOSED Pressure Switch (BS-21-PS) Cntnmnt Boundary Isolation Valve BSV-195        Reactor Building          UNCAPPED                    UNCAPPED                CLOSED AND Pressure Switch (BS-      AND OPEN                    AND OPEN                  CAPPED 21-PS) Instrument Air Test Valve IAV-733        Instrument Air Isolation  CLOSED                      CLOSED                  OPEN Valve to Cabinet ESPSC-3B3_
IAV-734        Instrument Air Isolation  CLOSED                      CLOSED                  OPEN Valve to Cabinet ESPSC-3B3 IAV-735        Instrument Air Isolation  CLOSED                      CLOSED                  OPEN Valve to Cabinet ESPSC-3A3 IAV-736        Instrument Air Isolation  CLOSED                      CLOSED                  OPEN Valve to Cabinet ESPSC-3A3 BSV-131        Pen 442 Iso.              LOCKED OPEN                  LOCKED OPEN              LOCKED OPEN BSV-233        BS-20-PS    Isolation    SEALED OPEN                  SEALED OPEN              SEALED OPEN Valve BSV-246        BS-26-PS    Isolation    SEALED OPEN                  SEALED OPEN              SEALED OPEN Valve BSV-247        BS-61-PS    Isolation    SEALED OPEN                  SEALED OPEN              SEALED OPEN Valve BSV-234        BS-23-PS    Isolation    SEALED OPEN                  SEALED OPEN              SEALED OPEN Valve BSV-250        BS-29-PS    Isolation    SEALED OPEN                  SEALED OPEN              SEALED OPEN Valve SP-178                                                            Rev. 30                                                        Page 107 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: RB PRESSURE SENSING & TESTING / INSTRUMENT AIR PEN. NO.: 319, 426, 429, 442                                                            Drawing: FD-302-712 Sheet I VALVE            VALVE            VENT                        TEST                  RESTORED    TAG PULLED  IND. VERF.
NO.          DESCRIPTION        LINEUP    INITIAUDATE      LINEUP INITIAUDATE    POSITION    INITIAUDATE  INIT/DATE BSV-211  Reactor Building    CLOSED                      CLOSED                SEALED CLOSED Pressure Switch (BS-61-PS) Cntnmnt Boundary Isolation Valve BSV-212  Reactor Building    OPEN                        CLOSED                SEALED CLOSED Pressure Switch (BS-61-PS) Cntnmnt Boundary Isolation Valve BSV-213  Reactor Building    UNCAPPED                    UNCAPPED              CLOSED AND Pressure Switch (BS- AND OPEN                    AND OPEN              CAPPED 61-PS) Instrument Air Test Valve BSV-214  Reactor Building    CLOSED                      CLOSED                SEALED CLOSED Pressure Switch (BS-26-PS) Cntnmnt Boundary Isolation Valve BSV-215  Reactor Building    OPEN                        CLOSED                SEALED CLOSED Pressure Switch (BS-26-PS) Cntnmnt Boundary Isolation Valve BSV-216  RB Pressure Switch  UNCAPPED                    UNCAPPED              CLOSED AND (BS-26-PS) Instrument AND OPEN                    AND OPEN              CAPPED Air Test Valve BSV-217  Reactor Building    CLOSED                      CLOSED                SEALED CLOSED Pressure Switch (BS-20-PS) Cntnmnt Boundary Isolation Valve.
BSV-218  Reactor Building    OPEN                        CLOSED                SEALED CLOSED Pressure Switch (BS-20-PS) Cntnmnt Boundary Isolation Valve SP-178                                                Rev. 30                                              Page 108 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: RB PRESSURE SENSING & TESTING / INSTRUMENT AIR R    m  mi    AIA m
* A Am      d I'LN. NU.: 319, 426, 42, 442                                                                  Drawing: PD-30Z-712 Sheet 1 VALVE            VALVE                VENT                        TEST                  RESTORED      TAG PULLED    IND. VERF.
NO.          DESCRIPTION            LINEUP    INITIAL/DATE      LINEUP INITIAL/DATE    POSITION      INITIAL/DATE  INIT/DATE BSV-219  RB Pressure Switch      UNCAPPED                    UNCAPPED                CLOSED AND (BS-20-PS) Instrument    AND OPEN                    AND OPEN                CAPPED Air Test Valve BSV-220  Reactor Building        CLOSED                      CLOSED                  SEALED CLOSED Pressure Switch (BS-29-PS) Cntnmnt Boundary Isolation Valve BSV-221  Reactor Building        OPEN                        CLOSED                  SEALED CLOSED Pressure Switch (BS-29-PS) Cntnmnt Boundary Isolation Valve BSV-222  RB Pressure Switch      UNCAPPED                    UNCAPPED                CLOSED AND (BS-29-PS) Instrument    AND OPEN                    AND OPEN                CAPPED Air Test Valve BSV-223  Reactor Building        CLOSED                      CLOSED                  SEALED CLOSED Pressure Switch (BS-23-PS) Cntnmnt Boundary Isolation Valve BSV-224  Reactor Building        OPEN                        CLOSED                  SEALED CLOSED Pressure Switch (BS-23-PS) Cntnmnt Boundary Isolation Valve BSV-225  Reactor Building        UNCAPPED                    UNCAPPED                CLOSED AND Pressure Switch (BS-    AND OPEN                    AND OPEN                CAPPED 23-PS) Instrument Air Test Valve IAV-729  Instrument Air Isolation CLOSED                      CLOSED                  OPEN Valve to Cabinet ESPSC-3B2 IAV-730  Instrument Air Isolation CLOSED                      CLOSED                  OPEN Valve to Cabinet ESPSC-3B2 SP-178                                                    Rev. 30                                                  Page 109 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: RB PRESSURE SENSING & TESTING / INSTRUMENT AIR PEN. NO.: 319, 426, 429, 442                                                                  Drawing: FD-302-712 Sheet I VALVE            VALVE                VENT                        TEST                  RESTORED    TAG PULLED  IND. VERF.
NO.          DESCRIPTION            LINEUP    INITIAUDATE      LINEUP  INITIAUDATE    POSITION    INITIAUDATE  INIT/DATE IAV-731  Instrument Air Isolation CLOSED                      CLOSED                  OPEN Valve to Cabinet ESPSC-3A2 IAV-732  Instrument Air Isolation CLOSED                      CLOSED                  OPEN Valve to Cabinet ESPSC-3A2 BSV-1 30  Pen 429 Iso.            LOCKED OPEN                LOCKED OPEN            LOCKED OPEN BSV-244  BS-25-PS Isolation        SEALED OPEN                SEALED OPEN            SEALED OPEN Valve BSV-231  BS-19-PS Isolation      SEALED OPEN                SEALED OPEN            SEALED OPEN Valve BSV-232  BS-22-PS Isolation      SEALED OPEN                SEALED OPEN            SEALED OPEN Valve BSV-249  BS-28-PS Isolation      SEALED OPEN                SEALED OPEN            SEALED OPEN Valve BSV-245  BS-60-PS Isolation      SEALED OPEN                SEALED OPEN            SEALED OPEN Valve BSV-196  Reactor Building        CLOSED                      CLOSED                  SEALED CLOSED Pressure Switch (BS-60-PS) Cntnmnt Boundary Isolation Valve BSV-197  Reactor Building        OPEN                        CLOSED                  SEALED CLOSED Pressure Switch (BS-60-PS) Cntnmnt Boundary Isolation Valve BSV-198  Reactor Building        UNCAPPED                    UNCAPPED                CLOSED AND Pressure Switch (BS-    AND OPEN                  AND OPEN                CAPPED 60-PS) Instrument Air Test Valve BSV-199  Reactor Building        CLOSED                      CLOSED                  SEALED CLOSED Pressure Switch (BS-25-PS) Cntnmnt Boundary Isolation Valve SP-178                                                    Rev. 30                                                Page 110 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: RB PRESSURE SENSING & TESTING / INSTRUMENT AIR D9=M    kin m '11    A19    A10 AA3                                                                                        nf 12n,2 71113 Qk,.64 i~ .
n.i~
l          .  * . I,  "F5.'I, "*Tf.., ,lF~~*                                                              I    ill, ItII lI    .,P I. I"      Lc VALVE                  VALVE                    VENT                        TEST                  RESTORED                TAG PULLED      IND. VERF.
NO.              DESCRIPTION                LINEUP    INITIAL/DATE      LINEUP INITIALDATE      POSITION                INITIAL/DATE    INIT/DATE BSV-200      Reactor Building                OPEN                        CLOSED                SEALED CLOSED Pressure Switch (BS-25-PS) Cntnmnt Boundary Isolation Valve BSV-201      RB Pressure Switch              UNCAPPED                    UNCAPPED              CLOSED AND (BS-25-PS) Instrument          AND OPEN                    AND OPEN              CAPPED Air Test Valve BSV-202      Reactor Building                CLOSED                      CLOSED                SEALED CLOSED Pressure Switch (BS-19-PS) Cntnmnt Boundary Isolation Valve BSV-203      Reactor Building                OPEN                        CLOSED                SEALED CLOSED Pressure Switch (BS-19-PS) Cntnmnt Boundary Isolation Valve BSV-204      RB Pressure Switch              UNCAPPED                    UNCAPPED              CLOSED AND (BS-19-PS) Instrument          AND OPEN                    AND OPEN              CAPPED Air Test Valve BSV-205      Reactor Building                CLOSED                      CLOSED                SEALED CLOSED Pressure Switch (BS-28-PS) Cntnmnt Boundary Isolation Valve BSV-206      Reactor Building                OPEN                        CLOSED                SEALED CLOSED Pressure Switch (BS-28-PS) Cntnmnt Boundary Isolation Valve BSV-207      RB Pressure Switch              UNCAPPED                    'UNCAPPED              CLOSED AND (BS-28-PS) Instrument          AND OPEN                    AND OPEN              CAPPED Air Test Valve SP-178                                                                Rev. 30                                                              Page 111 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: RB PRESSURE SENSING & TESTING / INSTRUMENT AIR D=KM      MKin a40        A19    A'7  AA3                                                              fl%.,  .;.... IEf2nfl'7413    Qk      6~ 4
* kll. I* .1.
* I  -,  J "    -I-Id                                                              Ia,  VIuII    .      -  I- *JII    L    I VALVE                      VALVE              VENT                        TEST                  RESTORED          TAG PULLED      IND. VERF.
NO.                DESCRIPTION            LINEUP    INITIAL/DATE      LINEUP  INITIALDATE      POSITION          INITIAL/DATE    INIT/DATE BSV-208            Reactor Building          CLOSED                      CLOSED                  SEALED CLOSED Pressure Switch (BS-22-PS) Cntnmnt Boundary Isolation Valve BSV-209            Reactor Building          OPEN                        CLOSED                  SEALED CLOSED Pressure Switch (BS-22-PS) Cntnmnt Boundary Isolation Valve BSV-210            RB Pressure Switch        UNCAPPED                    UNCAPPED                CLOSED AND (BS-22-PS) Instrument    AND OPEN                    AND.OPEN                CAPPED Air Test Valve IAV-737            Instrument Air Isolation  CLOSED                      CLOSED                  OPEN Valve to Cabinet ESPSC-3A4 BSV-132            Pen 319 Iso.              LOCKED OPEN                  LOCKED OPEN            LOCKED OPEN BSV-61            BS-16-PT Iso.            LOCKED OPEN                  LOCKED OPEN            LOCKED OPEN BSV-235            BS-62-PS Isolation        SEALED OPEN                  SEALED OPEN            SEALED OPEN Valve BSV-251            Isolation Valve for BS-  SEALED OPEN                  SEALED OPEN            SEALED OPEN 16-PT BSV-253            Isolation Valve for BS-  SEALED OPEN                  SEALED OPEN            SEALED OPEN 90-PT BSV-239            BS-90-PT Test Valve      SEALED                      SEALED                  SEALED CLOSED CLOSED AND                  CLOSED AND              AND CAPPED CAPPED                      CAPPED BSV-240            BS-16-PT Test Valve      CLOSED AND                  CLOSED AND              SEALED CLOSED CAPPED                      CAPPED                  AND CAPPED BSV-226            Reactor Building          CLOSED                      CLOSED                  SEALED CLOSED Pressure Switch (BS-62-PS) Cntnmnt Boundary Isolation Valve SP-178                                                              Rev. 30                                                        Page 112 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: RB PRESSURE SENSING & TESTING / INSTRUMENT AIR PEN. NO.: 319, 426, 429, 442                                                            Drawina: FD-302-712 Sheet I VALVE          VALVE            VENT                        TEST                  RESTORED    TAG PULLED  IND. VERF.
NO.        DESCRIPTION        LINEUP    INITIAUDATE      LINEUP INITIAUDATE      POSITION    INITIAUDATE  INIT/DATE BSV-227  Reactor Building      OPEN                        CLOSED                SEALED CLOSED Pressure Switch (BS-62-PS) Cntnmnt Boundary Isolation Valve BSV-228  Reactor Building      UNCAPPED                    UNCAPPED              CLOSED AND Pressure Switch (BS-  AND OPEN                    AND OPEN              CAPPED 62-PS) Instrument Air Test Valve SP-178                                                Rev. 30                                              Page 113 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: LEAK RATE & POST ACCIDENT HYDROGEN PURGE PEN. NO.: 116.121.122.125.202.305.306                                                  Dwac .:FD-302-722. Sht. 1 VALVE          VALVE                              TEST                  RESTORED        TAG PULLED    IND. VERF.
NO.        DESCRIPTION                            LINEUP                  POSITION        INITIAL/DATE  INIT/DATE LRV-35    Discharge Iso      122                CLOSED                  LOCKED CLOSED LRV-47    PA H2 Purge        122                CLOSED                  LOCKED CLOSED LRV-51    Discharge Iso      122                CLOSED                  CLOSED LRV-57    Discharge Drain    122                CLOSED                  SEALED CLOSED AND CAPPED LRV-37    Supply Line Vent  121                CLOSED                  SEALED CLOSED AND CAPPED LRV-52    PA H2 Purge        122                CLOSED                  CLOSED LRV-38    Discharge Iso      122                CLOSED                  CLOSED LRV-49    Discharge Iso      122                CLOSED                  CLOSED LRV-46*  Flowmeter Inlet    116                CLOSED*                SEALED CLOSED LRV-88    H2 Recombiner      122                CLOSED                  LOCKED CLOSED Iso LRV-90    H2 Recombiner                        CLOSED                  LOCKED CLOSED Iso                121 LRV-64    Flowmeter Inlet    116                CLOSED                  CLOSED Control LRV-92    H2 Recombiner      125                CLOSED                  LOCKED CLOSED Iso LRV-65    Flowmeter Inlet    116                CLOSED                  CLOSED Control LRV-94    H2 Recombiner      125                CLOSED                  LOCKED CLOSED Iso                125 LRV-70    PA H2 Purge        306                CLOSED                  CLOSED Filter Iso CAV-415  RB Atmos Sample    116                CLOSED*                CLOSED CAV-417  RB Atmos Sample    116                CLOSED                  CLOSED LRV-71    PA H2 Purge        306                CLOSED                  CLOSED Filter Iso LRV-72    PA H2 Purge        305                CLOSED                  CLOSED Filter Iso        305 LRV-73    PA H2 Purger      305                CLOSED                  CLOSED Filter Iso      I  0                              I SP-178                                            Rev. 30                                                Page 114 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: LEAK RATE & POST ACCIDENT HYDROGEN PURGE PEN. NO.: 116,121,122,125,202,305,306                                                  Dwg.:FD-302-722, Sht. 1 VALVE          VALVE                                TEST                  RESTORED      TAG PULLED    IND. VERF.
NO.        DESCRIPTION                            LINEUP                  POSITION      INITIAL/DATE    INIT/DATE LRV-36    Supply Iso        121                  LOCKED                LOCKED CLOSED CLOSED LRV-50    Supply Iso        121                LOCKED CLOSED          LOCKED CLOSED LRV-98    Test & Drain                          OPEN &                CLOSED & CAPPED 122_                UNCAPPED LRV-100  Test & Drain      121                OPEN &                CLOSED & CAPPED UNCAPPED LRV-102  Test & Drain      125                OPEN &                CLOSED & CAPPED UNCAPPED LRV-104  Test & Drain      125                OPEN &                CLOSED & CAPPED LRV-10_Test&_Dran_125UNCAPPED LRV-87    H2 Recombiner      122                CLOSED                LOCKED CLOSED Iso LRV-89    H2 Recombiner                          LOCKED                LOCKED CLOSED Iso                121                CLOSED LRV-91    H2 Recombiner      125                LOCKED                LOCKED CLOSED Iso                                    CLOSED LRV-93    H2 Recombiner      125                LOCKED                LOCKED Iso                                    CLOSED                CLOSED LRV-121  H2 Purge Iso      305/                OPEN                  CLOSED 306 LRV-123  H2 Purge Iso      305                OPEN                  CLOSED
                            /306
*May be opened for RB air sample.
SP-178                                            Rev. 30                                            Page 115 of 207
 
ATTACHMENT 3B ILRT VALVE LINEUPS PRIOR TO STABILIZATION SYSTEM: INDUSTRIAL COOLER PEN. NO.: 206,207,366,367 VALVE            VALVE          VENT                          TEST                    RESTORED  TAG PULLED    IND. VERF.
NO.          DESCRIPTION      LINEUP      INITIAUDATE      LINEUP  INITIAUDATE      POSITION  INITIAUDATE    INIT/DATE CIV-89    Pen 367 Drain &    OPEN &                        CLOSED &                SEALED Test              UNCAPPED                      CAPPED                  CLOSED & CAPPED CIV-86    Pen 366 Drain &    OPEN &                        CLOSED &                SEALED Test              UNCAPPED                      CAPPED                  CLOSED & CAPPED CIV-93    Pen 207 Drain &    OPEN &                        CLOSED &                SEALED Test              UNCAPPED                      CAPPED                  CLOSED &CAPPED CIV-87    Pen 206 Drain &    OPEN &                        CLOSED &                SEALED Test              UNCAPPED                      CAPPED                  CLOSED & CAPPED
*Open if associated cavity pump is in service.
SP-178                                                    Rev. 30                                            Page 116 of 207
 
ATTACHMENT 3C SPECIAL ILRT VALVE LINEUPS SYSTEM: INSTRUMENT & STATION SERVICE AIR PEN. NO.: 110,111,112 VALVE          VALVE          VENT                      TEST                      RESTORED  TAG PULLED    IND. VERF.
NO.        DESCRIPTION      LINEUP INITIAL/DATE        LINEUP  INITIAL/DATE      POSITION  INITIALDATE    INIT/DATE IAV-77  IA to RB Spray Iso  CLOSED                  CLOSED                    CLOSED IAV-62  IA to RB Spray Iso  CLOSED                  CLOSED                    LOCKED CLOSED IAV-16  Turb Bldg Loop Iso  CLOSED                  CLOSED                    OPEN IAV-90  IA to RB Spray Iso  CLOSED                  CLOSED                    CLOSED IAV-61  IA to RB Spray Iso  CLOSED                  CLOSED                    LOCKED CLOSED IAV-28    IA to RB Spray Iso UNLOCKED                CLOSED                    LOCKED CLOSED OPEN IAV-29    IA to RB Spray Iso UNLOCKED                CLOSED                    LOCKED CLOSED OPEN ,
IAV-360  Dirt Trap          OPEN &                  OPEN &                    CLOSED & CAPPED UNCAPPED                UNCAPPED IAV-361  Dirt Trap          OPEN &                  OPEN &                    CLOSED & CAPPED UNCAPPED                UNCAPPED IAV-364  Dirt Trap          OPEN                    OPEN                      CLOSED IAV-365  Dirt Trap          OPEN                    OPEN                      CLOSED IAV-362  Pen 111 Drain &    CLOSED &                CLOSED &                  SEALED CLOSED Test                CAPPED                  CAPPED                    & CAPPED IAV-363  Pen 112 Drain &    CLOSED &                CLOSED &                  SEALED Test                CAPPED                  CAPPED                    CLOSED
                                                                                & CAPPED SAV-128  Turb Bldg Loop Iso  CLOSED                  CLOSED                    CLOSED CAV-416  RB Atmos Sample    CLOSED                  CLOSED*                    CLOSED Station Iso SAV-21  SA to RB Iso        OPEN                    OPEN                      OPEN SAV-130  SA to RB Sample    CLOSED                  CLOSED                    CLOSED Station SAV-61  Pen 110 Drain &    CLOSED &                CLOSED &                  SEALED Test                CAPPED                  CAPPED                    CLOSED & CAPPED SAV-24  SA to RB Iso        UNLOCKED                UNLOCKED                  LOCKED CLOSED
                              & OPEN                  CLOSED*
SAV-23  SA to RB Iso        UNLOCKED                CLOSED                    LOCKED CLOSED
                              & OPEN                  (once vented)
IAV-293  IA Dirt Trap        OPEN                    OPEN                      CLOSED SAV-122  SA to RB Sample    UNLOCKED                UNLOCKED                  LOCKED CLOSED Sta Iso            & OPEN                  CLOSED*
SAV-131  SA Vent            OPEN                    OPEN                      CLOSED SP-1 78                                              Rev. 30                                            Page 117 of 207
 
ATTACHMENT 3C SPECIAL ILRT VALVE LINEUPS SYSTEM: INSTRUMENT & STATION SERVICE AIR PEN. NO.: 110,111,112 VALVE          VALVE          VENT                    TEST                      RESTORED  TAG PULLED    IND. VERF.
NO.        DESCRIPTION      LINEUP INITIAUDATE      LINEUP  INITIALIDATE        POSITION  INITIAUDATE  INIT/DATE (1)        RB Service Air    OPEN                  OPEN                      -CLOSED Receptacle SAV-69    SA to PAL Seal Iso CLOSED                CLOSED                    SEALED CLOSED SAV-71    SA to EAL Seal Iso CLOSED                CLOSED                    SEALED CLOSED SAV-73    SA to EH Seal Iso  CLOSED                CLOSED                    SEALED CLOSED SAV-70    SA to EAL Seal Iso CLOSED                CLOSED                    CLOSED SAV-45    SA to PAL Seal Iso CLOSED                CLOSED                    CLOSED SAV-46    SA to EAL Seal Iso CLOSED                CLOSED                    OPEN SAV-601    SA to PAL O.D. OPEN                  OPEN                      OPEN Seal SAV-602    SA to PAL I.D. OPEN                  CLOSED                    OPEN Seal SAV-603    SA to EAL O.D. OPEN                  OPEN                      OPEN Seal SAV-604    SA to EAL I.D. OPEN                  CLOSED                    OPEN Seal SAV-78    SA to EH Seal      OPEN                  OPEN                      SEALED CLOSED SAV-77**  EH Seal Test      OPEN                  OPEN                      SEALED CLOSED & CAPPED SAV-64    PAL Seal Vent      OPEN                  OPEN                      CLOSED SAV-65    EAL Seal Vent      OPEN                  OPEN                      CLOSED SAV-68    EH Seal Vent      OPEN                  OPEN                      CLOSED UNCAPPED              UNCAPPED
*May be opened for air sample
**Pressure gauge installed (1) Record selected valve number SP-178                                              Rev. 30                                              Page 118 of 207
 
ATTACHMENT 3C SPECIAL ILRT VALVE LINEUPS SYSTEM: NITROGEN PEN. NO.: 317,355,372                                                    Dwa.: FD-302-011 Sht.s 2. 4: FD-302-673 Sht. 4 VALVE          VALVE          VENT                        TEST                    RESTORED        TAG PULLED    IND. VERF.
NO.        DESCRIPTION      LINEUP INITIAL/DATE        LINEUP  INITIAL/DATE      POSITION      INITIAL/DATE    INIT/DATE NGV-89    N2 Supply to      CLOSED                    CLOSED                    OPEN RCDT NGV-1 93  N2 Supply to      CLOSED                    CLOSED                    CLOSED RCSG-1B CSV-38  N2 Supply to      CLOSED                    CLOSED                    CLOSED RCSG- 1B NGV-64    N2 Supply to      CLOSED                    CLOSED                    SEALED RCSG-1A                                                              CLOSED NGV-1 94  N2 Supply to      CLOSED                  CLOSED                    CLOSED RCSG-1A NGV-275  N2 Supply to      CLOSED                  CLOSED                    CLOSED RCSG- 1B NGV-278  N2 Supply to Press CLOSED                  CLOSED                    CLOSED NGV-281  N2 Supply to      CLOSED                  CLOSED                    CLOSED RCSG-1A NGV-8    N2 to RB Iso      CLOSED                  CLOSED                    CLOSED NGV-92  NG-78-PI Iso      OPEN                    OPEN                      OPEN NG-78-PI Pressure Gauge    **REMOVED                INSTALLED                INSTALLED NGV-93  N2 Iso to RCDT    OPEN                    CLOSED                    SEALED CLOSED NGV-182  Pen 372 Drain &    CLOSED &                CLOSED &                  SEALED Test              CAPPED                    CAPPED                    CLOSED & CAPPED NGV-82    N2 Iso to        UNLOCKED                  CLOSED                    LOCKED CLOSED Press/RCDT        &
OPEN NGV-209  N2 Supply to RB  OPEN &                  OPEN &                    CLOSED CAPPED Vent              UNCAPPED                  UNCAPPED NGV-78  NG-42-PI Iso      OPEN                    ***OPEN                    CLOSED NG-42-PI Pressure Gauge    **REMOVED                INSTALLED                INSTALLED NGV-79  N2 Supply to      OPEN                    CLOSED                    SEALED RCSG-1 B                                                              CLOSED NGV-181  Pen 317 Drain &    CLOSED &                  CLOSED &                  SEALED Test              CAPPED                  CAPPED      _          _  CLOSED & CAPPED NGV-81    N2 Supply to SG  UNLOCKED                  CLOSED                    LOCKED CLOSED Iso              &
OPEN SP-1 78                                              Rev. 30                                                  Page 119 of 207
 
ATTACHMENT 3C SPECIAL ILRT VALVE LINEUPS SYSTEM: NITROGEN
                                                                              .      ........        A .. ..........                  Am
* m PEN. NO.:    317,355,312                                                    Dw__.: FD-302-011 Sht.s 2, 4; FD-302-673 Sht. 4 VALVE          VALVE          VENT                        TEST                          RESTORED                TAG PULLED    IND. VERF.
NO.        DESCRIPTION      LINEUP    INITIAUDATE        LINEUP  INITIAUDATE            POSITION              INITIAL/DATE    INIT/DATE NGV-65      NG-38-PI ISO. OPEN                      ***OPEN                      CLOSED NG-38-PI    Pressure Gauge    **REMOVED                  INSTALLED                    INSTALLED NGV-284    N2 Primary Supply OPEN &                    CLOSED &                    CLOSED & CAPPED Drain            UNCAPPED                  CAPPED                                                                                I NGV-268    NGV-265 Control  OPEN                      OPEN                        CLOSED Valve Iso NGV-283    NGV-265 Control  OPEN                      OPEN                        CLOSED Valve Bypass NGV-262    N2 Primary Supply OPEN                      SEALED                      SEALED CLOSED Iso                                          CLOSED NGV-183    Pen 355 Drain &  CLOSED &                  CLOSED &                    SEALED Test              CAPPED                    CAPPED                      CLOSED & CAPPED NGV-62      N2 Supply to SG  UNLOCKED                  CLOSED                      LOCKED CLOSED Iso              &
OPEN      I
*Open if N2 required on OTSG, closed if N2 not required on OTSG.
**REMOVE gauge to vent line ONLY if indicated pressure on gauge exceeds 40 psig
***IF associated gauge was removed to vent header, CLOSE isolation valve for test.
SP-178                                                  Rev. 30                                                                Page 120 of 207
 
ATTACHMENT 3C SPECIAL ILRT VALVE LINEUPS SYSTEM: CORE FLOOD PFM      Mf-  19?'q 119  -q4~ %m1'l,1
_'17'1                                                                          fluo mri*Ff..2fl.7fl9  Qhaa4      I
  *  ... l. .. i,,                      *11/111t,                                                                      .    --
q./v  -  a .  .l.I,51*
VALVE                VALVE            VENT                            TEST                          RESTORED          TAG PULLED      IND. VERF.
NO.            DESCRIPTION        LINEUP      INITIAL/DATE        LINEUP        INITIAL/DATE      POSITION        INITIAUDATE      INIT/DATE NGV-4          Alt N2 CF Tanks    CLOSED                            CLOSED                        LOCKED CLOSED Iso NGV-9          N2 CF Tanks Iso    CLOSED                            CLOSED                        CLOSED NGV-220        N2 Supply          CLOSED                            CLOSED                        CLOSED NGV-1          CFT 1A N2          OPEN                              OPEN                          OPEN Supply NGV-2          CFT 1B N2          OPEN                              OPEN                          OPEN Supply NG-51-PI        Press Indicator    REMOVED                          REMOVED                        INSTALLED NGV-13          NG-51-PI-Iso        OPEN                              OPEN                          OPEN CFV-78          CFT 1B N2 Iso      OPEN                              OPEN                          OPEN CFV-76          CFT 1A N2 Iso      OPEN                              OPEN                          OPEN CFV-75          CFT 1A N2          OPEN &                            CLOSED &                      CLOSED & CAPPED Supply Vent        UNCAPPED                          CAPPED CFV-48          Pen 373 Drain &    OPEN &                            CLOSED &                      SEALED Test                UNCAPPED                          CAPPED                        CLOSED & CAPPED CFV-25          CFT 1A Fill Iso    OPEN                              CLOSED                        CLOSED CFV-49          Pen 123 Drain &    OPEN &                            CLOSED &                      SEALED Test                UNCAPPED*                        CAPPED                        CLOSED & CAPPED CFV-28          CFT 1A N2.          OPEN                              CLOSED                        CLOSED Supply CFV-77          CFT 1B N2          OPEN &                            CLOSED &                      CLOSED & CAPPED Supply Vent        UNCAPPED                          CAPPED CFV-47          Pen 350 Drain &    OPEN &                            CLOSED &                      SEALED Test                UNCAPPED                          CAPPED                        CLOSED & CAPPED CFV-26          CFT 1B Fill Iso    OPEN                              CLOSED                        CLOSED CFV-27          CFT 1B N2          OPEN                              CLOSED                        CLOSED Supply            _______          _  _ _    _ _ _  _ _ _ _ _  _ _ __                                    _ _    _ _ _
CFV-46          Pen 124 Drain &    OPEN &                            CLOSED &                      SEALED Test                UNCAPPED*                        CAPPED                        CLOSED & CAPPED CFV-1 5        CFT 1 B WD Vent    OPEN                              CLOSED                        CLOSED CFV-16          CFT 1A WD Vent      OPEN                              CLOSED                        CLOSED CFV-29          CFT WD Iso          OPEN                              CLOSED                        CLOSED CFV-50          Pen 351 Drain &    OPEN &                            CLOSED &                      SEALED Test                UNCAPPED                          CAPPED                        CLOSED & CAPPED SP-178                                                              Rev. 30                                                          Page 121 of 207
 
ATTACHMENT 3C SPECIAL ILRT VALVE LINEUPS SYSTEM: CORE FLOOD PEN. NO.: 123.124.350,351,352.373                                                                    Dwc.* FD-302-702 Sheet I VALVE            VALVE          VENT                          TEST                      RESTORED        TAG PULLED    IND. VERF NO.        DESCRIPTION      LINEUP    INITIAL/DATE      LINEUP  INITIAL/DATE      POSITION        INITIAL/DATE    INIT/DATE CFV-45      Pen 352 Drain &    SEALED                      SEALED                    SEALED CLOSED Test              CLOSED                      CLOSED                    & CAPPED
                                & CAPPED                    & CAPPED CFV-1 1    CFT 1A Sample      OPEN                        CLOSED                    CLOSED CFV-12      CFT 1B Sample      OPEN                        CLOSED                    CLOSED CFV-42      CFT Sample/WD      OPEN                        CLOSED                    CLOSED NGV-1 1    CFT Elec Heater    OPEN                        OPEN                      OPEN N2 Iso CFV-5      CF Tank 1A Outlet  CLOSED                      CLOSED                    **CLOSED Iso CFV-6      CF Tank 1 B Outlet CLOSED                      CLOSED                    **CLOSED Iso CFV-7      CF Tank 1 B to RC  CLOSED                      CLOSED                    CLOSED Drain Tank CFV-10      CF Tank 1A to RC  CLOSED                      CLOSED                    CLOSED Drain Tank
*A nitrogen pressure of approximately 20 PSIG may be used to aid draining.
**Valves closed with breaker Red Tagged in Locked Off position when RCS < 650 psi Valves open with breaker Red Tagged in Locked Off position when RCS > 700 psi NOTE: Perform core flood lineup prior to performing gas waste disposal lineup Attachments 3A, 3B.
SP-178                                                      Rev. 30                                                    Page 122 of 207
 
ATTACHMENT 3C SPECIAL ILRT VALVE LINEUPS SYSTEM: CONTAINMENT MONITORING PEN. NO.: 306,315,332,356,376                                                            Drawina: FD-302-693 Sheet 1 VALVE          VALVE        VENT                      TEST                    RESTORED        TAG PULLED    IND. VERF.
NO.        DESCRIPTION    LINEUP  INITIAL/DATE      LINEUP INITIAL/DATE      POSITION        INITIAL/DATE  INIT/DATE WSV-1    PA H2 Sample Iso  UNLOCKED &                CLOSED                  LOCKED CLOSED OPEN WSV-2    PA H2 Sample Iso  UNLOCKED &                CLOSED                  LOCKED CLOSED OPEN WSV-3    Cont Monitor Iso  OPEN                      CLOSED                  OPEN WSV-4    Cont Monitor Iso  OPEN                      CLOSED                  OPEN WSV-111  Alt. Sample Iso  OPEN                      OPEN                    OPEN WSV-5    Cont Monitor Iso  OPEN                      CLOSED                  OPEN WSV-6    Cont Monitor Iso  OPEN                      CLOSED                  OPEN WSV-9    Port H2 Anal      CLOSED                  CLOSED                  OPEN Sample Bypass WSV-26
* PA H2 Sample Iso  OPEN                      CLOSED                  CLOSED PWRIOFF WSV-27
* PA H2 Sample Iso  OPEN                    CLOSED                  CLOSED PWR/OFF WSV-28
* PA H2 Sample Iso  OPEN                      CLOSED                  CLOSED PWR/OFF WSV-29
* PA H2 Sample Iso  OPEN                    CLOSED                  CLOSED PWR/OFF WSV-30
* PA H2 Sample Iso  OPEN                      CLOSED                  CLOSED PWR/OFF WSV-31
* PA H2 Sample Iso  OPEN                    CLOSED                  CLOSED PWR/OFF WSV-123  RM-A6 Inlet      CLOSED                  CLOSED                  OPEN WSV-122  RM-A6 Outlet      CLOSED                  CLOSED                  OPEN WSV-32
* PA H2 Sample Iso  OPEN                    CLOSED                  CLOSED PWR/OFF WSV-33
* PA H2 Sample Iso  OPEN                    CLOSED                  CLOSED PWR/OFF WSV-34
* PA H2 Sample Iso  OPEN                    CLOSED                  CLOSED PWR/OFF WSV-35
* PA H2 Sample Iso  OPEN                    CLOSED                  CLOSED PWR/OFF WSV-36    PA H2 Sample Iso  OPEN                    OPEN                    CLOSED WSV-37    PA H2 Sample Iso  CLOSED                  CLOSED                  CLOSED WSV-38
* PA H2 Sample Iso  OPEN                    CLOSED                  CLOSED PWR/OFF WSV-39
* PA H2 Sample Iso  OPEN                    CLOSED                  CLOSED PWR/OFF WSV-40
* PA H2 Sample Iso  OPEN                    CLOSED                  CLOSED PWR/OFF WSV-41
* PA H2 Sample Iso  OPEN                    CLOSED                  CLOSED PWR/OFF WSV-42
* PA H2 Sample Iso  OPEN                    CLOSED                  CLOSED PWR/OFF WSV-43
* PA H2 Sample Iso  OPEN                    CLOSED                  CLOSED PWR/OFF WSV-663  H2 Analyzer B Iso CLOSED                  CLOSED                  OPEN WSV-664  H2 Analyzer A Iso CLOSED                  CLOSED                  OPEN WSV-109  Aim Detector Iso  CLOSED                  -CLOSED                  OPEN SP-1 78                                              Rev. 30                                                Page 123 of 207
 
ATTACHMENT 3C SPECIAL ILRT VALVE LINEUPS SYSTEM: CONTAINMENT MONITORING PEN. NO.: 306.315.332.356.376 Drawina: FD-302-693 Sheet 1 VALVE          VALVE            VENT                          TEST                        RESTORED        TAG PULLED  IND. VERF.
NO.        DESCRIPTION        LINEUP      INITIAUDATE      LINEUP    INITIAUDATE        POSITION        INITIAUDATE  INIT/DATE H2 Analyzer Cal  DISCONNECTE                    DISCONNECTED              RECONNECT Gas Bottles (4)  D WSV-7        Port H2 Anal    OPEN &                          OPEN &                    CLOSED & CAPPED Sample Iso      UNCAPPED                        UNCAPPED WSV-21      Pen 332 Drain &  OPEN &                          OPEN &                    CLOSED & CAPPED Test              UNCAPPED                        UNCAPPED WSV-44      Test Conn        OPEN &                          OPEN &                    CLOSED & CAPPED UNCAPPED                        UNCAPPED WSV-45      Test Conn        OPEN &                          OPEN &                    CLOSED & CAPPED UNCAPPED                        UNCAPPED WSV-46      Test Conn        OPEN &                          OPEN &                    CLOSED & CAPPED UNCAPPED                        UNCAPPED WSV-47      Test Conn        OPEN &                          OPEN &                    CLOSED & CAPPED UNCAPPED                        UNCAPPED WSV-48      Test Conn        OPEN &                          OPEN &                    CLOSED & CAPPED UNCAPPED                        UNCAPPED WSV-47      Test Conn FLEX    DISCONNECTE                    DISCONNECTED              DISCONNECTED HOSE            D WSV-48      Test Conn FLEX    DISCONNECTE                    DISCONNECTED              DISCONNECTED HOSE            D
* Cycle the following breakers for valve position verification. Restore per OP-700E DPDP-5A BKR 2 for WSV-29, 31, 35, & 43 DPDP-8A BKR 14 for WSV-28, 30, 34, & 42 DPDP-5B BKR 27 for WSV-27, 33, 39, & 40 DPDP-8B BKR 21 for WSV-26, 32, 38, & 41 SP-1178                                                      Rev. 30                                                    Page 124 of 207
 
ATTACHMENT 3C SPECIAL ILRT VALVE LINEUPS SYSTEM: FIRE SERVICE PEN. NO.: 430                                                                                        Drawina: FD-302-231 Sheet 5 of 7 VALVE          VALVE            VENT                            TEST                          RESTORED      TAG PULLED    IND. VERF.
NO.        DESCRIPTION        LINEUP    INITIAL/DATE        LINEUP  INITIAL/DATE          POSITION      INITIAL/DATE    INIT/DATE FSV-263    RB Iso          CLOSED                          CLOSED                        SEALED OPEN FSV-261    RB Iso          UNLOCKED                        CLOSED                        *OPEN/LOCKED
                              &                                                              CLOSED OPEN FSV-274    Vent            OPEN                            OPEN                          CLOSED FSV-275    Drain & Test    OPEN                            CLOSED                        CLOSED FSV-278    Drain & Test    OPEN &                          CLOSED &                      SEALED CLOSED UNCAPPED                        CAPPED                        CAPPED FSV-264    Branch iso      OPEN                            CLOSED                        OPEN FSV-277    Drain & Test    OPEN                            OPEN                          CLOSED CAPPED UNCAPPED                        UNCAPPED FSV-265    Branch Iso      CLOSED                          CLOSED                        OPEN
_____________ .1.              J              J              .1.                  A              __________
*FSV-261 will be open to charge the fire service standpipe only when work which introduces ignition sources or transient fire loads is being performed within the Reactor Building during Mode 5 or Mode 6. FSV-261 will be closed at all other times to maintain containment integrity.
SP-178                                                        Rev. 30                                                      Page 125 of 207
 
ATTACHMENT 3D SUPPLEMENTARY ILRT VALVE LINEUPS (Page 1 ofl)
SYSTEM:
VALVE        DESCRIPTION                        LOCATION          I  AS FOUND TEST L
[NI INIT ASLFTINT AS LEFT    INIT VV 4                                  4                    +        +      i              +
* 4                                  4                    +        +                      +        4 4                                  4                    +~                          +/-        4 4                                  4                    +        +      4              +        4 4                                  4                    +        4      4              .4-      4 Use this form to document additional lineups. Make additional copies as needed.
SP-178                                                  Rev. 30                                        Page 126 of 207
 
ATTACHMENT 3E BREAKER LIST Returned to Normal Action      Returned to    Independent Completed        Normal        Verification Initial/Date    Initial/Date    Initial/Date
: 1. Ensure following breakers are racked out lAW OP-209, OP-209A or OP-405:
4160V ES Bus 3A, Unit 3A8 (BSP-1A)                                            /
4160V ES Bus 3B, Unit 3B7 (BSP-1 B)                          /              /
7Conc.
: 2. Install a jumper at the following locations:                    Verif.
ES Press. SW Cab 3A1 TB2-1 1, TB2-12 (RPS Ch. "A"Dwg 210-602)
ES Press. SW Cab 3A1 TB1-1, TB1-2 (ES-A Ch 1 Dwg 210-602, 208-028 ES-A44)
ES Press. SW Cab 3A2 TB2-1 1, TB2-12 (RPS Ch. "B"Dwg 210-603)
ES Press. SW Cab 3A2 TB1-1, TB1-2 (ES-A Ch 2 Dwg 210-603, 208-028 ES-A45)
ES Press. SW Cab 3A3 TB2-1, TB2-2 (RPS Ch. "C" Dwg 210-604)
ES Press. SW Cab 3A3 TB1-1, TB1-2 (ES-A Ch 3 Dwg 210-604, 208-028 ES-A46)
ES Press. SW Cab 3A4 TB2-1, TB2-2 (RPS Ch. "D" Dwg 210-605)
ES Press. SW Cab 3B1 TB2-1, TB2-2 (ES-B Ch. 1 Dwg 210-606, 208-028 ES-B44)
ES Press. SW Cab 3B2 TB2-1, TB2-2 (ES-B Ch 2 Dwg 210-607, 208-028 ES-B45)
ES Press. SW Cab 3B3 TB2-1, TB2-2 (ES-B Ch 3 Dwg 210-608, 208-028 ES-B46)
SP-1 78                                              Rev. 30                              Page 127 of 207
 
ATTACHMENT 3E BREAKER LIST Returned to Normal Action      Returned to    Independent Completed        Normal        Verification Initial/Date    Initial/Date      Initial/Date Conc.
: 3. Open the following sliding links:                                Verif.              _  _    _  __  _
ES Press. SW Cab 3A1 TB1-3 (ES-A Ch 1 Dwg 210-602, 208-028 ES-A44)
ES Press. SW Cab 3A2 TB1-3 (ES-A Ch 2 Dwg 210-603, 208-028 ES-A45)
ES Press. SW Cab 3A3 TB 1-3 (ES-A Ch 3 Dwg 210-604, 208-028 ES-A46)
ES Press. SW Cab 381 TB2-3 (ES-B Ch. 1 Dwg 210-606, 208-028 ES-B44)
ES Press. SW Cab 3B2 TB2-3 (ES-B Ch 2 Dwg 210-607, 208-028 ES-B45)
ES Press. SW Cab 3B3 TB2-3 (ES-B Ch 3 Dwg 210-608, 208-028 ES-B46)
De-energize the following components, place the
: 4. listed breakers in the lock reset position:
: a.        ENSURE "HPI Valve Emerg Power Sel" switches are SELECT to "OFF" position lAW OP-209 or OP-209A MUV-23 and MUV-24 selected to "OFF", on ES-A panel                                /                I MUV-25 and MUV-26 selected to "OFF", on ES-A panel                                I                /
MUV-23 and MUV-24 selected to "OFF", on ES-B panel                                I                I MUV-25 and MUV-26 selected to "OFF", on ES-B panel                                I                /
SP-1 78                                              Rev. 30                              Page 128 of 207
 
ATTACHMENT 3E BREAKER LIST Returned to Normal Action      Returned to        Independent Completed        Normal            Verification Initial/Date  Initial/Date        Initial/Date
: b. ES-MCC-3A1 Breaker 4A (BSV-3)                      /                /                /
Breaker 1D (CFV-11)                      /                /                /
Breaker 2C (CFV-12)                      I              I                  I Breaker 2D (CFV-15)                      I              I                  I Breaker 38 (CFV-1 6)                    /                /                I Breaker 6A (AHV-1 B)                    /                I                /
Breaker 8A (AHV-1 C)                    I              I                  /
: c. ES-MCC-3A2 Breaker 5D (CAV-1)                      I              I                  I Breaker 6C (CAV-3)                      I              /                  I Breaker 9A (CAV-126)                    /              I                  /
Breaker 8C (MUV-260)                    I              /                  I Breaker 10B (MUV-261)                    I              I                  I Breaker 8A (MUV-258)                    I              I                  I Breaker 88 (MUV-259)                    I              I                  I Breaker 98 (WDV-3)                      /              I                  I Breaker 9C (WDV-60)                      I              /                I Breaker 10C (WDV-94)                    I              I                  /
Breaker 10A (WDV-406)                    /              /                I Breaker 6D (CAV-4)                      I              /                  I Breaker 5C (CAV-5)                      /              I                  I
: d. ES-MCC-3A3 Unit 2 EG (MUV-567)                      I      ]        I                  /
: e. ES-MCC-3B2                                ....        ______
Breaker 2A (MUV-27)                      I              I                  I Breaker 2C (BSV-4)                      I              I                  I SP-1 78                            Rev. 30                              Page 129 of 207
 
ATTACHMENT 3E BREAKER LIST Returned to Normal Action        Returned to      Independent Completed          Normal          Verification Initial/Date    Initial/Date        Initial/Date Breaker 5C (WDV-405)                                              I
: f.      ES-MCC-3B33 Breaker 3EG (MUV-1 8)                                /                I                  /
: g.      ES-MCC-3AB                              ..  .______                          .....      ____"
Breaker 2D (MUV-18)                                  /                /
Breaker 5C (DHV-91)                                  /                /
Breaker 7D (DWV-1 60)                                /                /
: 5. The following components are aligned to support the ILRT. Contact the ILRT Test Supervisor prior to manipulating these components. IfTags are required to identify components perform this step.
Valve                      Location                              .                _______...        ___
AHV-1A                    CB-ESFB                          /                /                  /
AHV-1D                    CB-ESFB                          /                /                  I CAV-2                      CB-ESFB                          I                /                  I CFV-29                    CB-ESFAB                                /        /                  /
CFV-42                    CB-ESFAB                        /                /                  /
CFV-42                    CB-ESFAB                        I                /                  /
CIV-34                    CB-ESFAB                        I                /                  /
CIV-35                    CB-ESFAB                        I                I                  /
CIV-40                    CB-ESFAB                        /                /                  I CIV-41                    CB-ESFAB                        /                /                  /
MUV-49                    CB-ESFAB                        /                /                  I MUV-543                    CB-ESFA                        /                I                  /
MUV-545                    CB-ESFB                        I                /                  /
MUV-253                    CB-ESFB                        /                /                  /
SP-1 78                                            Rev. 30                              Page 130 of 207
 
ATTACHMENT 3E BREAKER LIST Returned to Normal Action    Returned to      Independent Completed      Normal          Verification Initial/Date Initial/Date      Initial/Date Valve  Location SWV-47  CB-ESFAB                    /          /                I SWV-48  CB-ESFAB                    /          /                /
SWV-49  CB-ESFAB                    /          I                /
SWV-50  CB-ESFAB                    /          /                I SWV-79  CB-ESFAB                    I            /                I SWV-80  CB-ESFAB                    I            /                I SWV-81  CB-ESFAB                    I            /                /
SWV-82  CB-ESFAB                    /          /                  /
SWV-83  CB-ESFAB                    /          I                  /
SWV-84  CB-ESFAB                    /          I                  /
SWV-85  CB-ESFAB                    /          /                  I SWV-86  CB-ESFAB                    /          /                  I SWV-109 CB-ESFAB                    I          /                  /
SWV-110 CB-ESFAB                    I          /                  /
WDV-4  CB-ESFB                    I          /                  I WDV-61  CB-ESFB                    I          /                  /
WDV-62  CB-ESFB                    /          I                  /
WSV-3  CB-ESFA                    /          I                  I WSV-4  CB-ESFB                    /          I                  I WSV-5  CB-ESFA                    /          /                  I WSV-6  CB-ESFB                    I          /                  I WDP-2A  MCB PTL                    I          /                  /
WDP-2B  MCB PTL                    I          /                  /
CIP-3A  MCB VENT PAN.              I          I                  I CIP-3B  MCB VENT PAN.              /          /                I SP-1 78                      Rev. 30                          Page 131 of 207
 
ATTACHMENT 3E BREAKER LIST Returned to Normal Action    Returned to      Independent Completed      Normal          Verification Initial/Date Initial/Date      Initial/Date Valve  Location WDP-3A RAD WAS. PAN. PTL            /          /                /
WDP-3B RAD WAS. PAN. PTL            /          /                /
WDP-4A RAD WAS. PAN. PTL            I          I                /
WDP-4B RAD WAS. PAN. PTL            /          /                /
LOCAL CONTROL STATION 119' ELEV CGP-2  lB1 COMMENTS:
SP-1 78                      Rev. 30                          Page 132 of 207
 
ATTACHMENT 3F LEAK DETECTION DEVICE TRACKING SHEET (Page 1 of 1)
SYSTEM:
AREA                DESCRIPTION                      LOCATION                AS      TEST        INIT  AS LEFT  INIT    V FOUND        L/U
            +/-                                                            _______    +          +        4        +      +
            +                                                                        4                4        4                  +                                                            _______    4                4        4                  +                                    I                  I-            4                4        4                  +                                                                        4                4        4      4-t                                                                        t          +        4        4      +
4-                                    I                  4-            4          +        4        4      +
_______    4          +        4        4      4-Use this form to document additional lineups for gauge placements or to troubleshooting efforts. Make additional copies as needed.
SP-178                                  Rev. 30                                  Page 133 of 207
 
ATTACHMENT 4 CONTAINMENT BUILDING PRESSURIZATION/DEPRESSURIZATION SYSTEM INSTALLATION AND CHECKOUT 1.0    EQUIPMENT RECORD Much of the pressurization system equipment will be rented for the ILRT. The contract with the vendor provides for supplying 30,000 cfm capacity, and the necessary equipment to dry and cool the air. The exact number and types of components supplied by the vendor to meet these requirements may vary. The major components of the pressurization system are described below.
Record actual equipment used:
No.        No.        Description Planned    Used 20                    Air Compressor - Portable Engine(Diesel) Driven Screw Type, Capacity of 1500 scfm, 100% oil free, 100 psi. Total capacity:
30,000 cfm.
4                    3000 cfm Dryer LowPres Desciccant 2                    5400 cfm Dryer LowPres Desciccant 7                    Heat Exchangers (Aftercoolers) 1                    10,000 cfm Dryer LowPres Refrigerate 2                    Air Manifold 2                    60 ton Chiller LowTemp Air-Cool 2                    750 gpm Pump End Suction 1                    Surge Tank for Chillers 14                    2 IN Quick-Connect Hose 25 FT 10                    48 ft Fifth Wheel Dropdeck Trailer 2Ax 700'                  Hard piping; lengths of 8" diameter hard piping (8" 150# bolt pattern) as needed to reach from designated Laydown area to Penetration 216/217 area. A portion of piping/hose is being borrowed from Plant Vogtle for 2005 ILRT.
30                    3" bull hoses - 50' long - to inter-connect the compressors, after coolers, air dryers and supply manifolds 40                    3" bull hoses - 25' long - to inter-connect the compressors, after coolers, air dryers and supply manifolds Miscellaneous:
* Actual Number required will depend on final choice of set-up area.
SP-178                                  .Rev. 30                              Page 134 of 207
 
ATTACHMENT 4 CONTAINMENT BUILDING PRESSURIZATION/DEPRESSURIZATION SYSTEM INSTALLATION AND CHECKOUT 2.0    POWER REQUIREMENTS Temporary electrical power must be supplied to the pressurization system components. The types, quantities and ultimate load will vary based on the weather conditions expected during the test and test preparation periods and the actual equipment supplied by the vendor. The table below lists typical requirements. Mark the table up to reflect actual requirements as needed.
No.          No.        Description Planned      Used 1                      300x2 kW Generator Twinpack 1                      200 amp Window Panel 1                      800 amp Distribution Panel 8                      Quad Box String 20 FT 8                      4/0 Cam-Lok - 50 FT 1                    1 75 kVA Transformer LowVolt Fram SP-1 78                                  Rev. 30                              Page 135 of 207
 
ATTACHMENT 4 CONTAINMENT BUILDING PRESSURIZATION/DEPRESSURIZATION SYSTEM INSTALLATION AND CHECKOUT 3.0  PRESSURIZATION SYSTEM INSTALLATION
 
===3.1 TIMELINE===
0 Delivery, security inspection, transport into Owner-Controlled area, 1 day (Start of pressurization -4 days) 0 Set-up and check out pressurization system, connect to plant piping, 1-2 days (Start of pressurization -3 days)
* Resolve any compressor or component performance issues, perform flush/checkout if NOT previously completed (Start of pressurization -1 days)
      & Compressor vendor Operator/mechanic support of pressurization (Start of pressurization -2 hrs + pressurization cycle, 8-12 hrs)
* Refuel Compressors (Start of pressurization + 6hrs). Refueling can be performed while operating. Top off at end of pressurization.
* Vent manifold line and/or compressor bull hoses, release Vendor operator (End of Pressurization, beginning of Stabilization Phase)
* Plant personnel monitor pressurization line for leaks. (through Stabilization Phase)
      " Breakdown pressurization equipment - air dryers, compressors, chiller (if used), hose bibs to manifold (end of Verification Test). Schedule vendor pickup.
      " Disconnect rented manifold from plant-piping (end of Depressurization)
* Remove equipment from site, stage to parking lot, load onto vendor's flatbeds, ship (end of Depressurization + 1 day)
SP-178                                  Rev. 30                                Page 136 of 207
 
ATTACHMENT 4 CONTAINMENT BUILDING PRESSURIZATION/DEPRESSURIZATION SYSTEM INSTALLATION AND CHECKOUT 4.0    PRESSURIZATION SYSTEM CHECKOUT/LINE FLUSH 4.1      TEST EQUIPMENT 4.1.1      Fine mesh cloth for cleanliness check may be used during flushing.
4.2        PROCEDURE                                                                      Initials 4.2.1      Pressurization System Setup 4.2.1.1    Rented portions of Pressurization System are connected to each other per ILRT Test Supervisor's directions to the manifolds.
4.2.1.2    Have Maintenance Department remove blind flanges outside Reactor Containment at penetrations 216 and 217.
4.2.1.3    Have Maintenance Department install 12" to 8" reducing elbow and penetration isolation valve (PEN216-TV1 and PEN217-TV5) on both penetrations 216 and 217. Ensure penetration isolation valves PEN216-TV1 and PEN217-TV5 are closed.
4.2.1.4    Have Maintenance Department install test flanges on the containment side of Penetrations 216 and 217.
4.2.1.5    Perform (information only) LLRT of PEN216-TV1 and PEN217-TV5.
Perform LLRT of PEN216-TV2 and PEN217-TV6, if directed by ILRT Test Supervisor.
4.2.1.6    Have Maintenance Department remove test flanges on the containment side of Penetrations 216 and 217.
CAUTION Prior to pressurizing supply lines, remove all personnel from area with signs posted and area roped off.
4.2.2      Perform the following steps to verify pressurization line integrity.
4.2.2.1    Install loop-back hose inside the Turbine building between Penetration 216 8" supply line and Penetration 217 8" supply line.
4.2.2.2  Align pressurization system, per Table 1 Step 4.2.2.2, for test of Penetration 216 air supply line.
4.2.2.3    Start one diesel air compressor connected to Penetration 216 and slowly increase pressure in the test line via valve manifold to 100 psig.
4.2.2.4    Hold pressure for ten (10) minutes (or as required to complete walkdown/leak checks). Inspect each connection for gross leakage.
Repair any gross leakage. Small leakage is acceptable.
4.2.2.5    Ensure personnel are clear of exhaust muffler and slowly open PEN217-TV8.
SP-1 78                                  Rev. 30                                Page 137 of 207
 
ATTACHMENT 4 CONTAINMENT BUILDING PRESSURIZATION/DEPRESSURIZATION SYSTEM INSTALLATION AND CHECKOUT 4.2.2.6    Start remaining air compressors on Penetration 216 header one at a time until all compressors are running. Monitor exhaust muffler and piping continuously for vibration or excessive movement.
4.2.2.7    Open air sampling valve on Penetration 216 piping and notify Chemistry to perform an air sample. Also notify HP to perform a noise evaluation of the area. After air sample is complete, close air sample valve.
4.2.2.8    Secure all compressors for Penetration 216 after flush is complete.
4.2.2.9    Align pressurization system, per Table 1 Step 4.2.2.9, for test of Penetration 217 air supply line..
4.2.2.10  Start one diesel air compressor connected to penetration 217 and slowly increase pressure in test line via valve manifold to 100 psig.
4.2.2.11  Hold pressure for ten (10) minutes (or as required to complete walkdown/leak checks). Inspect each connection for gross leakage.
Repair any gross leakage. Small leakage is acceptable.
4.2.2.12  Ensure personnel are clear of exhaust muffler and slowly open PEN216-TV4.
4.2.2.13  Start remaining air compressors on Penetration 217 header one at a time until all compressors are running. Monitor exhaust muffler and piping continuously for vibration or excessive movement.
4.2.2.14  Open air sampling valve on Penetration 217 piping and notify Chemistry to perform an air sample. Also notify HP to perform a noise evaluation of the area. After air sample is complete, close air sample valve.
4.2.2.15  Secure all compressors for Penetration 217 after flush is complete.
4.2.2.16  Remove loop-back hose installed in Step 4.2.2.1.
4.2.2.17  Install remaining piping/hose for both Penetrations 216 and 217.
4.2.2.18  Place pressurization system in Pressurization System Standby lineup described in Table 1 of this attachment.
4.2.2.19  Top off compressors with fuel as necessary to be prepared for the ILRT.
5.0        PRESSURIZATION SYSTEM OPERATION 5.1        During ILRT rented portions of pressurization system will be operated by vendor-supplied personnel. These personnel will take direction from the ILRT Test Supervisor or his designee.
5.2        Permanent plant valves and components will be manipulated by plant operating or test unit personnel as directed by the ILRT Test Supervisor.
SP-178                                    Rev. 30                                Page 138 of 207
 
ATTACHMENT 4 CONTAINMENT BUILDING PRESSURIZATION/DEPRESSURIZATION SYSTEM INSTALLATION AND CHECKOUT 5.3      WHEN directed by ILRT Test Supervisor, THEN lineup pressurization system to pressurize containment per "Pressurize Containment" line of Table 1.
5.4      During Pressurization, SECURE compressors/pressurization system as directed by the ILRT Test Supervisor.
5.5      Top off air compressors fuel tanks before return to vendor (compressors are to be returned with the same fuel level as received or there will be an additional refueling charge).
5.6      When Pressurization is complete, the pressurization header will be isolated at the 8" isolation valves, PEN216-TV1, PEN216-TV2, PEN217-TV5, and PEN217-TV6. Once isolated, vent the pressurization headers through spare bib connections on the Pressurization System manifolds.
5.7      When directed by the ILRT Test Supervisor, disconnect the temporary piping from the "compressor-side" of the outboard 8" isolation valves at Penetrations 216 and 217 (remove piping from 216-2 and 217-2) in preparation for depressurization through this path.
6.0      PRESSURIZATION SYSTEM RESTORATION 6.1      WHEN directed by ILRT Test Supervisor, THEN various components of pressurization system may be disconnected from each other, and from pressurization system manifold (e.g., dryers, compressors, aftercoolers, chiller, etc,. as applicable).
6.2      Pressurization system manifold may NOT be removed until directed by ILRT Test Supervisor.
6.3      Rented portions of pressurization system will be disconnected, prepared for shipment and moved to a staging area outside Protected Area for pickup by vendor's freight carrier.
6.4      Temporary piping from Penetrations 216 and 217 to valves PEN216-TV1, PEN216-TV2, PEN217-TV5, PEN217-TV6 may be disassembled when the containment has been completely depressurized.
SP-178                                    Rev. 30                            Page 139 of 207
 
ATTACHMENT 4 CONTAINMENT BUILDING PRESSURIZATION/DEPRESSURIZATION SYSTEM INSTALLATION AND CHECKOUT TABLE 1 PRESSURIZATION                                o-,a)                  >Z >Z          >,            Z  2  Z      2__N
                                                                                                                        >m        Z 2m >&#xa2;    2E Z  " Z SYSTEM ALIGNMENT        "*N  O        *~-    o4-5.
                                                  ***          0**  0    C*~n~0  ** 0 04 tnD0              -,-    Cn 4-- Mn    4--      CD 4-*- 4-co (D  0                ~              l  ~    . C    .Q  )      (-I-l) F7    (1)
FT    Q )      -    C)      C) -    C)
                                                * -*o_ * *.                        o                      o        0r u0.D      0*I        cn*f                    Cl).      Cl.        Cl).      CD *          ).
* l.      Cl. Cl.
                                                        ._2    0        _  F7      o            O        DD Attach. 4, Step 4.2.2    OFF**      Instl'd  0            ON    O*  C                    0          C        C                    C      C*
Pressurization System Flush PEN 216 Attach. 4, Step 4.2.2.9  OFF**      Instl'd  0            ON    O*  C        -          C          C*        C                    O      C Pressurization System Flush PEN 217 Attach. 4, Step 4.2.2.18  OFF        Instl'd  C            OFF    C  C        C          C          C        C        C          C      C Press. System Standby Procedure Step 5.3        ON**        Instl'd  0            ON    0*  0*        0*          0*          C            0*    0*        0*    C Pressurize Containment Containment at Pressure  OFF        Instl'd  C            OFF    C  C        C          C          C        C        C          C      C During ILRT              OFF        Instl'd  C            OFF    C  C        C          C          C        C        C          C      C During Verification Test OFF        Instl'd  C            OFF    C  C        C          C          C        C        C          C      C During Depressurization  Rmv'd      Rmv'd    C            OFF    C  0        Thrtl      C          0        0        Thrtl      C    0 Open                                        Open
*Opened and closed as directed by the ILRT Test Supervisor
**Started and Stopped as directed by the ILRT Test Supervisor SP-1 78                                Rev. 30                                Page 140 of 207
 
ATTACHMENT 5 ILRT MEASUREMENT SYSTEM INSTALLATION AND CHECKOUT 1.0    SPECIAL EQUIPMENT AND/OR INSTRUMENTATION REQUIREMENTS The following instrumentation or equivalent are required for the Integrated Leak Rate Test and are recently calibrated (within 6 months of test or in accordance with the plant's/supplier's Test Equipment program) and the calibration dates are properly documented in this appendix.
1.1.1 Absolute Pressure Quantity        2 Manufacturer    Paroscientific Inc.
Type              Precision pressure gauge Model 760-100A with Direct Pressure Readout and RS-232 Range            0 - 100 psia Accuracy          +/- 0.010% Full Scale (+ 0.01 psia)
Repeatability    + 0.005% Full Scale (+ 0.005 psia)
Resolution      0.0001 psi 1.1.2 Drybulb Temperature Quantity        30 planned (6 more than 1991 ILRT to minimize stabilization time)
Manufacturer    Graftel Type              Model 9202 Thermistors Range            50 - 150&deg;F Accuracy          +/-2.0&deg;F Repeatability    +/-0.01 OF Resolution      +/-0.0010 F SP-178                                  Rev. 30                                Page 141 of 207
 
ATTACHMENT 5 ILRT MEASUREMENT SYSTEM INSTALLATION AND CHECKOUT 1.1.3. Relative Humidity Quantity      10 Manufacturer  Graftel Type          Model 9203 Relative Humidity Sensors (Temperature compensated bulk polymer chip)
Range          10 - 90% RH Accuracy      +/- 2.0% RH Repeatability +/- 0.10% RH Resolution    0.5 %RH 1.1.4 Verification Flow Quantity      2 (1 primary, 1 backup)
Manufacturer  Brooks Type          Mechanical tube and float Range          2.57-25.6 scfm (< 0-32 scfm)
Accuracy      + 2% full scale Repeatability  +/- 0.2% full scale Resolution    2% FS 1.1.5 Ambient Pressure Quantity                1 Range                  0 - 25 psia Accuracy                +/- .1 psi SP-1 78                              Rev. 30                            Page 142 of 207
 
ATTACHMENT 5 ILRT MEASUREMENT SYSTEM INSTALLATION AND CHECKOUT 2.0    GENERAL 2.1    Sensors should be located in the middle of the air volume they are monitoring, away from structural steel and other heat sources or sinks wherever possible, to minimize thermal lag.
Drybulb Temperature Sensors = 30 Dewcells or Humidity Sensors = 10 Precision Pressure Sensors = 2 Flow Meters = 1 with 1 backup Sensor locations are described in Step 6.0 3.0    SENSOR REJECTION INSTRUCTIONS NOTE Raw sensor data on functionally dependent parameters such as temperature, pressure and humidity should NOT be rejected solely based on statistical rejection techniques. Rather, sensor data may be rejected and NOT used in final calculation of air mass provided a good physical reason exists, such as loss of instrument power or erratic signal.
3.1    IF a sensor is rejected during the Type A test, THEN:
3.1.1 Which Sensor(s) rejected and cause SHALL be recorded in log of events.
3.1.2 The sensor's volume fraction SHALL be re-assigned the other sensors using volume fractions provided in the Sensor Failure Analysis, Table 1 3.1.3 All data points for Type A test, including those taken prior to rejection of sensor(s), SHALL be re-calculated with the sensor's input deleted. Use Single Failure Recommendations in Instrumentation Recommendations for Integrated Leak Rate Testing.
3.1.4 IF practical, THEN data from rejected sensor(s) should continue to be recorded for duration of both Type A test AND Verification Test.
3.1.5 IF a sensor is rejected during verification test, Type A test leakage rate, Verification Test leakage rate, and verification leakage rate limits SHALL be recalculated.
3.1.6 A sensor SHALL NOT be removed solely because its removal improves leakage rate result.
SP-178                                  Rev. 30                                  Page 143 of 207
 
ATTACHMENT 5 ILRT MEASUREMENT SYSTEM INSTALLATION AND CHECKOUT 4.0  CALIBRATION INFORMATION 4.1  Test instrumentation have been calibrated within six months of start of ILRT, or at interval specified by the applicable Test Equipment QA program. Calibration SHALL be traceable to NIST 4.2  A calibration check has been completed at ambient conditions within 1 month of start of ILRT. Calibration of Field Standards SHALL be traceable to NIST.
Cal. Cal. Verified By/Date  Std.        Sensor    Dev. Cal. Check    Accept. Used As Sensor S/N    MTE#        Date  Due    Calibration        Rdg.        Rdg.      from      Verified      Criteria    During Date                                              Std. By/Date                    ILRT:
                                                                                                              + 2.0OF
                                                                                                              + 2.0OF
                                                                                                              + 2.0OF
                                                                                                              + 2.0OF
                                                                                                              + 2.0&deg;F
                                                                                                              + 2.0OF
                                                                                                              + 2.0 0 F
                                                                                                              + 2.0OF
                                                                                                              + 2.0&deg;F
                                                                                                              + 2.0OF
                                                                                                              + 2.0OF SP-178                                Rev. 30                                  Page 144 of 207
 
ATTACHMENT 5 ILRT MEASUREMENT SYSTEM INSTALLATION AND CHECKOUT Cal. Cal. Verified By/Date Std. Sensor  Dev. Cal. Check Accept. Used As Sensor S/N MTE# Date  Due    Calibration      Rdg. Rdg. from    Verified  Criteria During Date                                    Std. By/Date            ILRT:
                                                                                    + 2.0OF
                                                                                    + 2.0OF
                                                                                    + 2.0OF
                                                                                    + 2.0OF
                                                                                    + 2.0OF
                                                                                    + 2.0OF
                                                                                    + 2.0OF
                                                                                    + 2.0OF
                                                                                    + 2.0OF
                                                                                    + 2.0OF
                                                                                    + 2.0&deg;F
                                                                                    + 2.0&deg;F
                                                                                    + 2.0OF
                                                                                    + 2.0OF SP-1 78                  Rev. 30                        Page 145 of 207
 
ATTACHMENT 5 ILRT MEASUREMENT SYSTEM INSTALLATION AND CHECKOUT Cal. Cal. Verified By/Date Std. Sensor  Dev. Cal. Check Accept. Used As Sensor S/N MTE# Date  Due    Calibration      Rdg. Rdg. from    Verified  Criteria During Date                                    Std. By/Date            ILRT:
                                                                                    + 2.0OF
                                                                                    + 2.0&deg;F
                                                                                    + 2.0OF
                                                                                    + 2.0OF
                                                                                    + 2.0&deg;F
                                                                                    + 2.0OF
                                                                                    + 2.0OF
                                                                                    + 2.0OF
                                                                                    + 2.0OF
                                                                                    + 2.0&deg;F
                                                                                    + 5%RH
                                                                                    + 5%RH
                                                                                    + 5%RH
                                                                                    + 5%RH SP-1 78                  Rev. 30                        Page 146 of 207
 
ATTACHMENT 5 ILRT MEASUREMENT SYSTEM INSTALLATION AND CHECKOUT Cal. Cal. Verified By/Date  Std. Sensor  Dev. Cal. Check  Accept. Used As Sensor S/N  MTE#  Date    Due    Calibration        Rdg. Rdg. from    Verified    Criteria  During Date                                      Std. By/Date                ILRT:
                                                                                            + 5%RH
                                                                                            + 5%RH
                                                                                            + 5%RH
                                                                                            + 5%RH
                                                                                            + 5%RH
                                                                                            + 5%RH
                                                                                            + 5%RH
                                                                                            + 5%RH'
                                                                                            + 5%RH
                                                                                            + 5%RH
                                                                                            + 5%RH a      ~.      S                  I      S        I        S            L          A t      a                                t      i        4                                4 SP-1 78                        Rev. 30                          Page 147 of 207
 
ATTACHMENT 5 ILRT MEASUREMENT SYSTEM INSTALLATION AND CHECKOUT Cal. Cal. Verified By/Date    Std. Sensor    Dev. Cal. Check  Accept.      Used As Sensor S/N  MTE#  Date  Due    Calibration        Rdg. Rdg.      from    Verified    Criteria    During Date                                          Std. By/Date                  ILRT:
1      1            1                                            t            I          4-a      -      I                  A.      .5.        A.      fl            J          .5.
SP-178                      Rev. 30                            Page 148 of 207
 
ATTACHMENT 5 ILRT MEASUREMENT SYSTEM INSTALLATION AND CHECKOUT NOTES:
: 1. ALL sensing line tubing (pressure and flow) should be pressurized to test pressure and snooped for leaks. This can be done during pressurization if sensing line can be isolated for repairs.
: 2. The acceptance criteria for the calibration check for the pressure gauges is a limitation on the variance between the two corrected (if applicable) gauge readings when compared against each other. The check can be performed at atmospheric pressure or test pressure. A comparison is made because most plants do NOT possess field standards of equivalent or better accuracy to use during a calibration check due to the extremely high accuracy of the ILRT gauges.
: 3. Per ANSI 56.8-1994, para. 4.2.1, Pretest checks are NOT required for mechanical flow rate device (e.g., rotameters),
however they are highly recommended. Flow meter calibration checks are also a simple comparison, typically against a known valve position. The calibration check should be preceeded by a line "flush" with air to verify NO particulates or moisture exists in the sensing line. The calibration check should be performed at a flow rate equivalent to LO to verify that tubing size is adequate to pass the desired flow rate with existing bends, valves, and pressure drops.
: 4. The Paroscientific precision pressure gauges are to be installed in the locations provided for by the client. They will assume the nomenclature PI-1 and PI-2, and be connected to plant tubing at LRV-39 and LRV-40 as per FD-302-722.
: 5. The two rotameters to be used for the Verification test will assume the nomenclature FE-4 and FE-5, and are to be connected at LRV-65 and LRV-64 per FD-302-722. Do NOT connect tubing from LRV-66 and LRV-67 to the outlets of the rotameters.
SP-1 78                                  Rev. 30                                Page 149 of 207
 
ATTACHMENT 5 ILRT MEASUREMENT SYSTEM INSTALLATION AND CHECKOUT 5.0    INSTRUMENTATION INSTALLATION SENSOR STRING TERMINATION RECORD INSTALLED    REMOVED                    INSTALLED  REMOVED INIT/DATE  INIT/DATE                    INIT/DATE INIT/DATE
#1 IN        A                                            A B                                            B
              +                                            +
S                                            S SENSOR STRING TERMINATION RECORD INSTALLED ISALDRMVD    REMOVED      OUTSIDE WIRE # INSTALLED INTLE      REMOVED RMOD STRING #        INSIDE WIRE        INIT/DATE  INIT/DATE                    INIT/DATE INIT/DATE
#1 OUT      A                                            A B                                            B
              +                                            +
            *S                                            S SP-1 78                        Rev. 30                      Page 150 of 207
 
ATTACHMENT 5 ILRT MEASUREMENT SYSTEM INSTALLATION AND CHECKOUT SENSOR STRING TERMINATION RECORD STRING #  INSIDE WIRE        INSTALLED    REMOVED      OUTSIDE WIRE # INSTALLED  REMOVED INIT/DATE  INIT/DATE                    INIT/DATE INIT/DATE
#2.IN    A                                            A B                                            B
          +                                            +
S                                            S SENSOR STRING TERMINATION RECORD INSTALLED    REMOVED                    INSTALLED  REMOVED INIT/DATE  INIT/DATE                    INIT/DATE INIT/DATE
#2 OUT    A                                            A B                                            B
          +                                            +
S                                            S SP-1 78                    Rev. 30                        Page 151 of 207
 
ATTACHMENT 5 ILRT MEASUREMENT SYSTEM INSTALLATION AND CHECKOUT SENSOR STRING TERMINATION RECORD STRING #  INSIDE WIRE        ISALDRMVD                OUTSIDE WIRE # INTLE      RMOD INIT/DATE  INIT/DATE                    INIT/DATE INIT/DATE
#3 IN    A                                            A B                                            B
          +                                            +
S                                            S SENSOR STRING TERMINATION RECORD INSTALLED ISALDRMVD    REMOVED      OUTSIDE WIRE # INSTALLED INTLE      REMOVED RMOD STRING #  INSIDE WIRE          INIT/DATE  INIT/DATE                    INIT/DATE INIT/DATE
#3 OUT    A                                            A B                                            B
          +                                            +
S                                            S SP-178                    Rev. 30                        Page 152 of 207
 
ATTACHMENT 5 ILRT MEASUREMENT SYSTEM INSTALLATION AND CHECKOUT SENSOR STRING TERMINATION RECORD INSTALLED REMOVED        OUTSIDE WIRE # INSTALLED INTLE      REMOVED RMOD STRING #  INSIDE WIRE        ISALDRMVD INIT/DATE  INIT/DATE                    INIT/DATE INIT/DATE
#4 OUT    A                                          A B                                          B
          +                                          +
S                                          S SP-178                    Rev. 30                        Page 153 of 207
 
ATTACHMENT 5 ILRT MEASUREMENT SYSTEM INSTALLATION AND CHECKOUT 6.0    INSTRUMENT LOCATIONS 6.1    Instrument locations are approximate and may be changed at Test Supervisor discretion. New locations will be recorded below, evaluated and documented in Attachment 7.
6.2    Since temperature stratifies by elevation, azimuth and radius are NOT critical dimensions. Sensors should be placed away from heat sources and heat sinks such as concrete walls and steel I-beams.
6.3    Additional variations are permitted if existing location is in a high radiation field, inaccessible location, or near a heat sink or heat source.
6.4    Volume Weighting Fractions provided have been properly input into-ILRT Software SP-1 78                                  Rev. 30                                    Page 154 of 207
 
ATTACHMENT 5 ILRT MEASUREMENT SYSTEM INSTALLATION AND CHECKOUT SENSOR LOCATIONS AND VOLUME FRACTIONS TEST      ELEVATION              AZIMUTH                RADIUS                  VWF        SENSOR EQUIPMENT  Original Actual    Original    Actual    Original      Actual    Original  Actual  S/N TEl      105'            120o (ESE)                  60'                  0.0368 (LR-20-TE)
TE2      105'            220o (SSW)                  60'                  0.0368 (LR-21-TE)
TE3      105'          320o (WNW)                  62'                  0.0367 (LR-22-TE)
TE4      108'              180o (S)            -40' - Outer              0.0588 (LR-23-TE)                                          D-Ring wall TE5      140'            120o (ESE)                  60'                  0.0588 (LR-24-TE)
TE6. 140'            220o (SSW)                  60'                  0.0588 (LR-25-TE)
TE7      140'          320o (WNW)                  60'                  0.0165 (LR-26-TE)
TE8      140'              10o (N)            -40' - Outer              0.0547 (LR-27-TE)                                          D-Ring wall TE9      186'              100o (E)                  60'                  0.0547 (LR-28-TE)
TE10      180'            220o (SSW)            20' Off hndrl              0.0638 (LR-29-TE)                                            W-side, B D-ring TEl 1    260'            290o (WNW)                  -20'                  0.0547 (LR-30-TE)
TE12      180'            450 (NE)                  -40'                  0.0637 (LR-31-TE)
TE13    260'              180o (S)                -20'                  0.0361 (LR-32-TE)
TE14    244'              50o (NE)                  60'                  0.0361 (LR-33-TE)
SP-1 78                      Rev. 30                          Page 155 of 207
 
ATTACHMENT 5 ILRT MEASUREMENT SYSTEM INSTALLATION AND CHECKOUT SENSOR LOCATIONS AND VOLUME FRACTIONS TEST      ELEVATION              AZIMUTH                  RADIUS                  VWF        SENSOR EQUIPMENT  Original Actual    Original    Actual    Original      Actual    Original  Actual  S/N TE15    220'              100o (E)                  -45'                  0.0361 (LR-34-TE)
TE16    215'            225o (SSW)                  55'                  0.0361 (LR-35-TE)
TE17    243'              180o (S)                  65'                  0.0361 (LR-36-TE)
TE18    239'              280o (W)                    65'                  0.0361 (LR-37-TE)
TE19    215'            320o (WNW)                    60'                  0.0360 (LR-38-TE)
TE20    244'                0o (N)                  65'                  0.0360 (LR-39-TE)
TE21      108'              10o (N)              -40' Inside,              0.0165 (LR-52-TE)                                          N end SG-A D-ring TE22      140'              170o (S)            Outer Rx Wall              0.0135 (LR-53-TE)                                          SG-B D-Ring TE23      180'            225o (SSW)                  60'                  0.0546 (LR-54-TE)
TE24      180'          320o (WNW)                    60'                  0.0546 (LR-55-TE)
TE25 (LR-20-TE)
TE26 (LR-20-TE)
TE27 (LR-20-TE)
TE28 (LR-20-TE)
SP-1 78                      Rev. 30                            Page 156 of 207
 
ATTACHMENT 5 ILRT MEASUREMENT SYSTEM INSTALLATION AND CHECKOUT SENSOR LOCATIONS AND VOLUME FRACTIONS TEST      ELEVATION            AZIMUTH                  RADIUS                  VWF      SENSOR EQUIPMENT  Original Actual    Original    Actual    Original      Actual    Original  Actual  SIN TE29 (LR-20-TE)
TE30 (LR-20-TE)
VWF TOTAL      1.00 HE1      105'            1700(S)              -40'- Outer                0.0270 (LR-41-HE)                                          D-Ring wall HE2      105'            2700 (W)                  62'                  0.1103 (LR-42-HE)
HE3      140'            270o (W)                  -15'                  0.1764 (LR-43-HE)
HE4      140'              10o (N)            -40' - Outer              0.0330 (LR-44-HE)                                          D-Ring wall HE5    244'              15o (N)                  65'                  0.1267 (LR-45-HE)
HE6      215            320o (WNW)                  60'                  0.1267 (LR-46-HE)
HE7      215              260o (W)                  60'                  0.1266 (LR-47-HE)
HE8    200'            120o (ESE)                  60'                  0.0911 (LR-48-HE)
HE9      180'              0o (N)                  -20'                  0.0911 (LR-49-HE)
HE10      180'            1700(S)              Outer Rx Wall              0.911 (LR-50-HE)                                        SG-B D-Ring VWF TOTAL      1.00 SP-1 78                      Rev. 30                          Page 157 of 207
 
ATTACHMENT 6 INTENTIONALLY LEFT BLANK SP-1 78      Rev. 30            Page 158 of 207
 
ATTACHMENT 7 TEST EXCEPTIONS LOG (Page 1 of 1)
TEST EXCEPTION LOG                                                                    PAGE        OF Date/Time        Proc.      Initials                            Description/Resolution
____ __-    Step      __  _  _  _    _ _  _ _ _  _ _ _  _ _ _  _  _ _  _ _ _  _  _  _ _ _ _  _ _ _ _
I        +
4        4-I        f 4        4-                            1        *l-            -I-4        4              4-i        i              +
1        1              -I-4        4              4-4        1                              4        4              4-4        1              4-I        1                              4        4              4 I        I              I
              +        +
              +        +                i Make additional copies as necessary SP-178                                          Rev. 30                                Page 159 of 207
 
ATTACHMENT 8 VALVE LINEUP ALTERATION LOG (Page 1 of 1)
COMPONENT                INSIDE                ILRT            RE-POSITIONED BY                      RESTORED TO ILRT POSITION                    COMMENTS/DISPOSITION (Indiv. Comp.)        CNTMNT?            POSITION                      (Name/Ext.)                    (Initials/Date)
                    ~1~                r                      t                                                              I
                    +                  I.                                                                                    .1
                    .1~_______________ C ________________    C ____________________________      &#xa3; ________________________ j ______________________________________________
This form is used to provide a mechanism to track temporary modifications to "completed" valve lineups/component status necessitated by ongoing outage activities during ILRT preparation. The form is used because many lineups/components are positioned via administrative procedure, SOP or other means, without tags. The ILRT Test Supervisor may elect to leave certain components in the requested position after reviewing them for potential impact on the ILRT.
Make additional copies of this form as necessary.
SP-1 78                                              Rev. 30                                                Page 160 of 207
 
ATTACHMENT 9 CONTAINMENT PENETRATION
 
==SUMMARY==
 
PENETRATION STATUS DURING ILRT APP.J TEST          P. Penalty Addn.? LAST TEST    As-Left As-Found Leakag SYSTEM            PEN#  PEN. DESCRIPTION      STTSSTATUS PRGM STTS                  (i yes (if e = value) au)DATENote        MLP MPL      MPL      e Saig STATUS                      1Savings Main Steam              105  MSL A-2            Normal        N/R Standby L/U Main Steam              106  MSL A-1            NormalN/R Standby  L/U Main Steam              107  MSL B-2            Normal        N/R Standby  UU Main Steam              201  MSL B-1            Normal        N/R Standby UU Normal Main Steam              314  RCSG 1-B Drain      Standby L/U,  N/R Bottled Up for P1 Main Steam              316  RCSG 1-A Sec Vent  Normal        N/R Standby L/U Normal Main Steam              318  RCSG 1-A Drain      Standby  L/U,  N/R Bottled Up for PI Main Steam              320  RCSG 1-B Sec Vent  Normal /UU Standby        N/R Main Steam              427  RCSG 1-B Drain      Normal /UU Standby        N/R Main Steam              428  RCSG 1-A Drain      Normal        N/R Standby L/U Feedwater & Emerg. FW    108  Main FW "B"        Normal Standby LJU    NIR Feedwater & Emerg. FW    109  EFW "B"            Normal        N/R Standby  UU Feedwater & Emerg. FW    423  Main FW "A"        Normal        N/R Standby  L/U Feedwater & Emerg. FW    424  EFW "A"            Normal        N/R Standby L/U Condensate & Demin      117  Demin Wtr to CNTMNT Take Penalty  Type C Water Instrument & Station Air 110  Station Air        ILRT is Testing        Type C SP-178                                  Rev. 30                            Page 161 of 207
 
ATTACHMENT 9 CONTAINMENT PENETRATION
 
==SUMMARY==
 
SSEPN POTESTAPP. J                    DATENote      As-Left As-Found Leakag e
SYSTEM          PEN#  PEN. DESCRIPTION          TESTAS      PRGM    PenaltyAddn.?    LAST  TEST                    Leakag STTSSTATUS            (if yes = value)                MPL      MPL    Saig STATUS                          1Savings ILRT is Instrument & Station Air 111  Instrument Air        Testing      Type C ILRT is Instrument & Station Air 112  Instrument Air        Testing      Type C Nuclear Services Closed                              Normal Cycle321                      Letdown CIr 3B Supply          L/    N/R Nuclear Services  Closed 322  Letdown Clr 3B Return Normal        N/R Cycle Cooling                                        Standby  LJU Nuclear Services  Closed      Letdown Cir 3A/3C    Normal        N/R Cycle Cooling                  Supply                Standby  LJU Nuclear Services  Closed      Letdown CIr 3A/3C    Normal        N/R Cycle Cooling                  Return                Standby  L/U  _
Nuclear Services  Closed 330  CRDMS Supply          Normal        N/R Cycle Cooling            330                        Standby  L/U  N/R Nuclear Services  Closed 331  CRDMS Return          Normal        N/R Cycle Cooling                                        Standby  LJU Nuclear Services  Closed      RB Vent Fan 3C        Normal Cycle Cooling            358  Supply                Standby  L/U  N/R Nuclear Services  Closed 359  RB Vent  Fan 3C      Normal        N/R Cycle Cooling                  Return                Standby L/U Nuclear Services  Closed 368  RB Vent  Fan 3A      Normal        N/R Cycle Cooling                  Supply                Standby LJU Nuclear Services  Closed      RB Vent  Fan 3A      Normal Cycle Cooling                  Return                Standby LJU Nuclear Services  Closed 370  RB Vent  Fan 3B      Normal        N/R Cycle Cooling                  Supply                Standby L/U Nuclear Services  Closed      RB Vent Fan 3B        Normal Cycle Cooling                  Return                Standby L/U Nuclear Services  Closed 326  RCP 1C Return        Normal        N/R Cycle Cooling                                        Standby LJU Nuclear Services  Closed 325  RCP 1C Supply        Normal        N/R Cycle Cooling                                        Standby LJU    N/R Nuclear Services  Closed 363  RCP 1D Return        Normal Cycle Cooling                                        Standby L/U Nuclear Services  Closed                            Normal        N/R Cycle Cooling                        D Supply      Standby L/U    N/R SP-1 78                                Rev. 30                              Page 162 of 207
 
ATTACHMENT 9 CONTAINMENT PENETRATION
 
==SUMMARY==
 
TEST      APP. J  Penalty Addn.?  LAST TEST As-Left As-Found Leakag SYSTEM                      PEN#            PEN. DESCRIPTION        STTSSTATUS PRGM      (if yes = value) DATENote  MPL      MPL      e Saig STATUS                          1                      Savings Nuclear Services Closed          324            RCP 1A Return          Normal      N/R Cycle Cooling                                                            Standby L/U Nuclear Services Closed            323            RCP 1A Supply          Normal      NIR Cycle Cooling                                                            Standby L/U Nuclear Services Closed                                                  Normal Cycle Cooling                                                            Standby  L/U __
Nuclear Services Closed            364            RCP 1B Supply          Normal      N/R Cycle Cooling                                                            Standby  L/U N/R Spent Fuel Cooling                347            Fuel Trnsfr Crg        Take Penalty Type C Purification ILRT is Spent Fuel Cooling                348            Fuel Transfer Tube    Testing      Type B ILRT is Spent Fuel Cooling                436            Fuel Transfer Tube    Testing      Type B Decay Heat Removal                329            PZR Sprayline          Take Penalty Type C Decay Heat Removal                345            RB Sump Recirc        Normal      N/R
____________________Standby                                        /U N/
Normal Decay Heat Removal                346            RB Sump Recirc        Standby L/U  N/R Reactor Coolant                    N/A Makeup & Purification            333            Letdown to Purif Demin Take Penalty Type C Makeup & Purification            353            HPI to RB Sump        Take Penalty Type C Makeup & Purification            377            RCP Seal Bleedoff      Take Penalty Type C Makeup & Purification            338            RCP Seal Supply        Normal      N/R Standby  /U N/
Makeup & Purification            434            HPCI                  Normal      N/R
____________________Standby                                        LIU NR Normal Makeup & Purification            435            Makeup & HPCI            o Standby LU  N/R Makeup & Purification            336            HPCI                  Normal      N/R
__________________ _______________________                Standby L/U  NR SP-1 78                                                      Rev. 30                            Page 163 of 207
 
ATTACHMENT 9 CONTAINMENT PENETRATION
 
==SUMMARY==
 
TEST      APP. J  Penalty Addn.?    LAST TEST As-Left As-Found Leakag SYSTEM        PEN#  PEN. DESCRIPTION        STPRGM STTSSTATUS          (if yes = value)  DATENote  MPL      MPL      e Saig STATUS                        1                      Savings Normal Makeup & Purification 337  HPCI                o StandbyLU    N/R Liquid Sampling      425  PASS                Take Penalty Type C Liquid Sampling      439  PZR & RCS Sample    Take Penalty Type C Liquid Sampling      440  SG 3A Sample        Take Penalty Type C Liquid Sampling      441  SG 3B.Sample        Take Penalty Type C Nitrogen              317  N2 to SG Secondary  Take Penalty Type C Nitrogen              355  N2 to RCS          Take Penalty Type C Nitrogen              372  N2 to RCDT          Take Penalty Type C Core Flood            123  N2 to CFT 1A        Take Penalty Type C Core Flood            124  N2 to CFT 1B        Take Penalty Type C Core Flood            350  CFT M/U            Take Penalty Type C Core Flood            351  CFT Vent            Take Penalty Type C Core Flood            352  CFT Sample/Bleed    Take Penalty Type C Core Flood            373  CFT M/U            Take Penalty Type C Liquid Waste Disposal 339  RB Sump            Take Penalty Type C Liquid Waste Disposal 349  RCDT Vent          Take Penalty Type C Liquid Waste Disposal 374  RCDT Drain          Take Penalty Type C Gas Waste Disposal    354  RCS Equipment Vents Take Penalty Type C SP-1 78                            Rev. 30                            Page 164 of 207
 
ATTACHMENT 9 CONTAINMENT PENETRATION
 
==SUMMARY==
 
TEST      APP. J  Penalty Addn.?    LAST TEST As-Left  As-Found Leakag PRGM                      DATENote  AsL      A-u        e STATUS    STATUS    (if yes = value)    1MPL              MPL  Savings ILRT is Containment Monitoring  306  PASS                  Testing      Type C ILRT is Containment Monitoring 315  RB Air Sample        Testing      Type C ILRTting Containment Monitoring 332  RB Air Sample Return  ILRT is      Type C
________              ~Testing                                                    _____
ILRT is Containment Monitoring 356  RB Air Sample        Testing      Type C Cntmnt. Mon. Sample  ILRT is Containment Monitoring 376  Return                Testing      Type C Normal Reactor Building Spray 340  RB Spray              Standby L    N/R Reactor Building Spray 341  RB Spray              Normal      N/R S~~Standby                      LIU NR RB Press Sensing &    426  RB Press Sensing      ILRT is      N/R Testing, IA                  RrssSnin_/            Testing RB Press Sensing &                                ILRT is      N/R Testing, IA            442  RB Press Sensing      Testing RB Press Sensing &    429  RB Press Sensing      ILRT is      N/R Testing, IA                                        Testing RB Press Sensing &    319  RB Press Sensing      ILRT is      N/R Testing, IA                  RBPressSensing        Testing319 Leak RateH & Post Leaccdete    Purg      116  RB Leak Rate          Take Penalty Type C Accident H2 Purge Leak Rate & Post            RB Leak Rate, H2      ILRT is Accident H2 Purge            Recombiner            Testing Leak Rate & Post            RB Leak Rate, H2      ILRT is Accident H2 Purge            Recombiner            Testing Leak Rate  & Post AcdnH2Pre125          H2 Recombiner Return  ILRT is TsigType          C Accident H2 PurgeTetn LaccideteH2 Purge      202  RB Leak Rate          Take Penalty T ype C Leak Rate & Post                                  ILRT is Accident H2 Purge                                  Testing Leak Rate & Post                                  ILRT is Accident H2 Purge      306  PASS                  Testing      Type C SP-178                                Rev. 30                            Page 165 of 207
 
ATTACHMENT 9 CONTAINMENT PENETRATION
 
==SUMMARY==
 
TEST  APP. J'  Pnly dn.          LAST TEST AsLf sFud Leakag SYSTEM    PEN#    PEN. DESCRIPTION        TESTPRGM                              DATENote              e STATUS    STATUS    (if yes = value)            MPL  MPL Savings ILRT is Containment Purge 113      RB Purge Supply      Testing      Type C ILRT is Containment Purge 357      RB Purge Exhaust      Testing      Type C Industrial Cooler 206      RBICW Supply          Take Penalty Type C Industrial Cooler 207      RBICW Return          Take Penalty Type C Industrial Cooler 366      RBICW Supply          Take Penalty Type C Industrial Cooler 367      RBICW Return          Take Penalty Type C ILRT is Fire Service      430      FSW to CNTMNT        Testing      Type C RB Airlock        433      RB Personnel Airlock  Outer        Type B
_____                  ~OPEN        Tp RB Airlock        222      RB Equipment Hatch    Outer Door  Type B Airlock                OPEN SP-1 78                            Rev. 30                              Page 166 of 207
 
ATTACHMENT 10 CONTAINMENT BUILDING VISUAL INSPECTION (Page 1 of 6)
Initials 1.0  CONTAINMENT VISUAL INSPECTION 1.1  10CFR 50, Appendix J and Regulatory Guide 1.163 require a visual inspection of accessible areas of the internal and external surfaces of the Reactor Containment building.
This inspection requirement may be met in part or its entirety by completing EGR-NGGC-0351, Visual Inspection of Plant Structures, NDEP-0620, VT-1 and VT-3 Visual Examination of ASME Section XI, Subsection IWE Components of Nuclear Power Plants, or by walking down the containment per the instructions in this Attachment. N/A any section below met by accepting a completed EGR-NGGC-0351 or NDEP-0620 inspection result.
2.0  EXTERIOR INSPECTION 2.1  INSPECT all pipe and electrical penetration areas, Airlocks (outside), and all other accessible exterior surfaces for the following that might cause loss of Containment's function:
* cracks
* distortions
* loss of material
* any other unusual conditions 2.2  Using the following tables, RECORD the results of the inspection, making note of all abnormal findings, deteriorations, and WO #'s for corrective action:
ALL PIPE AND ELECTRICAL PENETRATION AREAS ABNORMALITIES                                    WRT #
1.
2.
3.
4.
5.
6.
                                                                                    /
Initials / Date SP-178                                  Rev. 30                                Page 167 of 207
 
ATTACHMENT 10
                  'CONTAINMENT BUILDING VISUAL INSPECTION (Page 2 of 6)
EXTERIOR INSPECTION (continued)                                                          Initials AIRLOCKS A
                    ........... O EOUIPMENT EQUIPMENT HATCH H  .. H (OUTSIDE~
                                                          . IDE)
ABNORMALITIES                                  WO #
1.
2.
3.
4.
5.
6.
                                                                              /
Initials / Date ALL OTHER ACCESSIBLE EXTERIOR SURFACES ABNORMALITIES                                  WO #
1.
2.
3.
4.
5.
6.
                                                                                /
Initials / Date SP-178                              Rev. 30                              Page 168 of 207
 
ATTACHMENT 10 CONTAINMENT BUILDING VISUAL INSPECTION (Page 3 of 6)
Initials 3.0    INTERIOR INSPECTION 3.1    INSPECT all pipe and electrical penetration areas, 80' and 95' Airlocks (inside), all other accessible interior surfaces, liner insulation, and Reactor Sump Pit area for the following that might cause loss of Containment's function:
* cracks
* distortions
    " loss of material
* any other unusual conditions 3.2    Using the following tables, RECORD the results of this inspection, making note of all abnormal findings, deteriorations, and WO #'s for corrective action:
ALL PIPE AND ELECTRICAL PENETRATION AREAS ABNORMALITIES                                      WO #
1.
2.
3.
4.
5.
6.
SP-1 78                                    Rev. 30                              Page 169 of 207
 
ATTACHMENT 10 CONTAINMENT BUILDING VISUAL INSPECTION (Page,4 of 6)
INTERIOR INSPECTION (continued)                                        Initials PERSONNEL & EQUIPMENT HATCH AIRLOCKS (INSIDE)
ABNORMALITIES                        WO #
1.
2.
3.
4.
5.
6.
ALL OTHER ACCESSIBLE INTERIOR SURFACES ABNORMALITIES                        WO #
1.
2.
3.
4.
5.
6.
SP-178                          Rev. 30                  Page 170 of 207
 
ATTACHMENT 10 CONTAINMENT BUILDING VISUAL INSPECTION (Page 5 of 6)
INTERIOR INSPECTION (continued)                                Initials INSPECT THE LINER INSULATION ABNORMALITIES                      WO #
1.
2.
3.
4.
5.
6.
REACTOR SUMP PIT AREA ABNORMALITIES                      WO #
1.
2.
3.
4.
5.
6.
SP-178                          Rev. 30                  Page 171 of 207
 
ATTACHMENT 10 CONTAINMENT BUILDING VISUAL INSPECTION (Page 6 of 6)
COMMENTS:
TEST PERFORMERS:
Print Name:              Initials:            Signature/Date:
SP-1 78                      Rev. 30                          Page 172 of 207
 
ATTACHMENT 11 CONTINGENCIES 1.0    TEST ABORT Test Phase                  Safe Condition                          Abort Plans Preparation      Stop in progress alignments.              Place components in a safe condition as directed by CRS, SSO, Test Supervisor. Document all manipulations on Attachment 8.
Pressurization
* Close pressurization valve(s).          From SAFE condition:
                  - Unload and stop compressors.
* Proceed to Section 0, Depressurization Phase.
0 Release plant systems under Test organization control (tags).
                                                            . Depressurize plant per procedure and any specific directions from operations/management.
                                                            . Unless otherwise directed, continue collecting data during depressurization Stabilization
* Stop leak survey activities.
o Assess plant activities which may be in progress (sampling, stopping sump      Same as above draining, etc.).
                  . Continue data acquisition.
Hold Test (ILRT)  - Inherently stable, NO active manipulation of plant equipment.      Same as above
                  . Stop leak survey activities.
                  . Continue data acquisition.
Verification Test
* Only activity is imposition of a known leak from containment.
                  . Continue data acquisition.
o If requested, stop imposed leak flow.
Depressurization  o Isolate depressurization path until
* Continue with depressurization otherwise notified.                      when so directed.
o Update Test Supervisor/Ops on current  - Alter depressurization path as pressures/conditions in containment,    directed by SSO if required.
o Monitor depressurization rate closely.
SP-178                                  Rev. 30                              Page 173 of 207
 
ATTACHMENT 11 CONTINGENCIES 2.0    VALVE LINEUP ERRORS 2.1    NOTIFY ILRT Test Supervisor, SSO 2.2    Test Supervisor/Consultant EVALUATE impact on test.
2.3    NOTIFY SSO of course of action chosen, reposition valve if appropriate, enter actions into Attachment 1, Test Log.
2.4    IF decision is made to leave valve in other than Attachment 3 desired test position, record actions and rationale in Attachment 7, Test Exceptions. This course of action is often acceptable if current results are acceptable, and re-positioning valve would require re-starting test phase. REVIEW penetration's final status against Attachment 9 status. Modify as appropriate.
IF the proposed correction of a valve lineup error could change the leakage rate being measured, the Test Supervisor must consider impact on the current test phase, the schedule, and the final acceptability of the test results.
NOTE REPOSITIONING A VALVE THAT COULD IMPACT MEASURED LEAKAGE RATE COULD REQUIRE RESTARTING THE TEST.
Follow the guidance in Section 3.0 for errors causing excessive leakage. RECORD any actions taken in Attachment 1, Test Log.
3.0    EXCESSIVE LEAKAGE TEST PHASE            LEAK SCENARIO                              RESPONSE Pressurization            1. Containment
* Verify LLRT procedure tests leaking barrier in Boundary, Locally        Post-Accident direction, AND that a LLRT will NOTE:                        Leak Rate Testable.      measure observed leakage.
Pressurization does                                0 IF penalty addition is already being applied for NOT have to be                                        barrier, THEN take steps to isolate leakage.
stopped during leakage
* IF a penalty addition was NOT planned AND evaluation unless                                      leakage can be measured later with a LLRT, Shift/Test Management                                  THEN isolate penetration.
so orders.                                          . Continue pressurization to test pressure.
                                                    . Record/explain action in Attachment 1, (Test Supervisor's Log) AND Attachment 7, (Test Exceptions Log), THEN modify penetration's test status in Attachment 9, (Containment Penetration Summary).
SP-1 78                                    Rev. 30                                  Page 174 of 207
 
ATTACHMENT 11 CONTINGENCIES TEST PHASE    LEAK SCENARIO                            RESPONSE Pressurization  2. Containment          . Evaluate whether the leak can be later measured Continued:          Boundary, NOT          with an Appendix J leak test. IF YES, THEN Locally Leak Rate      proceed as described in scenario 1 above.
Testable.
* IF leakage can NOT be determined later with a local leakage rate style test, THEN evaluate whether leak can be isolated at test pressure.
                                        . IF leakage can be isolated with containment at pressure, THEN continue pressurization to final test pressure AND measure leakage in Stabilization Mode.
                                        . IF leakage can NOT be isolated once containment exceeds 12 psi, THEN STOP pressurization AND evaluate options (e.g. entry to close additional valves, correct a lineup, etc.).
                                        . IF necessary, THEN notify SSO, ILRT Test Supervisor AND request permission to depressurize to < 12 psi to effect repairs.
                                        . Record/explain action in Attachment 1, (Test Supervisor's Log); AND Attachment 7, (Test Exceptions Log), THEN modify penetration's test status as reflected in Attachment 9, (Containment Penetration Summary) if appropriate..
: 3. Test Boundary
* IF observed leakage is from a line or component that is a Test Boundary, NOT a containment boundary as determined by ILRT Test Supervisor (e.g. such as a flange on the pressurization line),
THEN take steps to isolate or correct leakage.
* Continue pressurization.
* Record/explain action in Attachment 1, (Test Supervisor's Log).
: 4. MSIV
* IF leakage is excessive, and it appears to be flowing through a MSIV, consider breaking vacuum in the secondary plant.
SP-1 78                          Rev. 30                                  Page 175 of 207
 
ATTACHMENT 11 CONTINGENCIES TEST PHASE          LEAK SCENARIO                              RESPONSE Stabilization          4. Containment
* Continue collecting data if leakage shows Boundary, Locally      downward trend that can be projected to drop NOTE:                      Leak Rate Testable      below acceptance criteria - take NO action.
It is NOT unusual to                            . IF leakage does NOT appear to be trending into experience what                                    an acceptable range, THEN apply scenario 1 appears to be high                                response.
leakage early in
* Verify containment pressure -- 96% Pa.
stabilization due to
* Reset Stabilization phase start time in ILRT processes such as in-                              computer (i.e. regenerate arrays from data point gassing and void                                  directly AFTER corrective action was taken).
equalization. It is imperative that NO action be taken until a full evaluation of a problem is complete.
: 5. Containment
* Continue collecting data if leakage shows Boundary, NOT          downward trend that can be projected to drop Locally Leak Rate      below acceptance criteria - take NO action.
Testable
* Evaluate whether leak can be measured later with an Appendix J leak test. IF YES, THEN proceed as described in scenario 1 above.
* IF leakage can NOT be determined later with a local leakage rate style test, THEN evaluate whether leak can be isolated at test pressure.
                                                . IF leakage can be isolated with containment at pressure, THEN remain in Stabilization Mode long enough to measure leakage, THEN isolate leak.
                                                . Verify containment pressure > 96% Pa.
                                                . Reset array start time and quantify change once leak is isolated.
0 IF the leakage can NOT be isolated at test pressure, THEN quantify leakage using ILRT computer. Notify SSO, ILRT Test Management AND request permission to depressurize to
                                                  < 12 psi to effect repairs.
* Record/explain the action in Attachment 1, (Test Supervisor's Log) AND Attachment 7, (Test Exceptions Log). Modify penetration's test status in Attachment 9, (Containment Penetration Summary).
SP-178                                  Rev. 30                                  Page 176 of 207
 
ATTACHMENT 11 CONTINGENCIES TEST PHASE      LEAK SCENARIO                              RESPONSE Stabilization      6. Test Boundary
* IF observed leakage is from a line or component Continued                                      that is a Test Boundary, NOT a containment boundary as determined by the ILRT Test Supervisor (e.g. such as a flange on the pressurization line), THEN take steps to isolate or correct leakage.
                                            " Verify containment pressure > 96% Pa.
                                            " Restart data collection in Stabilization mode, continue test.
                                            " Record/explain action in Attachment 1, (Test Supervisor's Log).
Hold Test (ILRT)    7. Containment
* Continue collecting data if leakage shows a Boundary, Locally      downward trend that can be projected to drop Leak Rate Testable      below acceptance criteria - take NO action.
* IF leakage is excessive and does NOT appear to be trending downward, THEN apply scenario 4 response.
0 Verify containment pressure > 96% Pa.
                                            . Reset Test phase start time in ILRT computer (i.e. regenerate arrays from data point directly AFTER corrective action was taken).
NOTE:              8. Containment          o Continue collecting data if leakage shows a Typically excessive    Boundary, NOT          downward trend that can be projected to drop leakage will be        Locally Leak Rate      below acceptance criteria - take NO action.
detected and          Testable
* Evaluate whether leak can be measured later addressed during                              with an Appendix J leak test. IF YES, THEN stabilization.                                proceed as described in scenario 1 above.
* IF leakage can NOT be determined later with a local leakage rate style test, THEN evaluate whether leak can be isolated at test pressure.
                                            . IF leakage can be isolated with containment at pressure, THEN remain in Test Mode long enough to measure leakage, then isolate the leak.
o Verify containment pressure > 96% Pa.
o Reset Test mode start and quantify change once leak is isolated (e.g. final measured leakage -
measured leakage observed prior to action).
                                            . IF leakage can NOT be isolated at test pressure, THEN quantify leakage using ILRT computer, notify SSO, ILRT Test Management and request permission to depressurize to < 12 psi to effect repairs.
                                            . Record/explain action in Attachment 1, (Test Supervisor's Log) AND Attachment 7, (Test Exceptions Log). Modify penetration's test status in Attachment 9, (Containment Penetration Summary).
SIP-1178                            Rev. 30                                  Page 177 of 207
 
ATTACHMENT 11 CONTINGENCIES TEST PHASE            LEAK SCENARIO                            RESPONSE Hold Test (ILRT)        9. Test Boundary
* IF observed leakage is from a line or component Continued.                                          that is a Test Boundary, NOT a containment boundary as determined by the ILRT Test Supervisor (e.g. such as a flange on the pressurization line), THEN take steps to isolate or correct leakage.
* Verify containment pressure _>  96% Pa.
* Restart data collection in Test mode, continue test.
                                                  . Record/explain action in Attachment 1, (Test Supervisor's Log).
Verification Test      10. Containment
* Apply scenario 7 response.
(Leakage out of              Boundary, Locally
* Verify containment pressure _>96% Pa.
acceptance band              Leak Rate          . Restart data collection in Test mode, complete HIGH)                        Testable              another ILRT, then verify that test result.
                                                  . Record/explain action in Attachment 1, (Test Supervisor's Log) AND Attachment 7, (Test Exceptions Log). Modify penetration's test status in Attachment 9, (Containment Penetration Summary).
NOTE:                  11. Containment
* Apply scenario 8 response.
Leakage should have          Boundary, NOT      . Verify containment pressure a 96% Pa.
been identified earlier      Locally Leak Rate
* Restart data collection in Test mode, complete in the test. Changes in      Testable              another ILRT, then verify that test result.
leakage at this point
* Record/explain action in Attachment 1, (Test are typically due to                                Supervisor's Log) AND Attachment 7, (Test plant system/lineup                                Exceptions Log). Modify penetration's test status changes                                            in Attachment 9, (Containment Penetration Summary).
SP-178                                    Rev. 30                                  Page 178 of 207
 
ATTACHMENT 11 CONTINGENCIES EXCESSIVE LEAKAGE continued TEST PHASE              LEAK SCENARIO            RESPONSE Verification Test        12. Test Boundary        0 Apply scenario 9 response.
Continued
* Verify containment pressure > 96% Pa.
                                                  . Restart data collection in Test mode, complete another ILRT, then verify that test result.
0 Record/explain action in Attachment 1, (Test Supervisor's Log) AND Attachment 7, (Test Exceptions Log). Modify penetration's test status in Attachment 9, (Containment Penetration Summary).
Depressurization        13. ANY
* IF ILRT, Verification Test passed, and leakage is from a Test Boundary, THEN NO IMPACT to ILRT results.
                                                  . IF leakage is through a containment boundary, THEN ILRT Supervisor, ILRT Management and Plant Management will evaluate leak path.
                                                  . IF directed by Test Supervisor, THEN ISOLATE leak path.
                                                  . IF leakage path can NOT be isolated and it represents a safety hazard, THEN it may be prudent to secure depressurization while additional boundaries/safety precautions are established.
* Continue depressurization to atmospheric.
4.0    UNEXPECTED ALARMS / INDICATIONS / CONDITIONS 4.1    Any unexpected alarms, indications OR conditions SHALL be discussed with the ILRT supervisor and other departments / individuals as germane to the condition AND addressed as determined appropriate to the situation.
5.0    RCS FILLING OR BORATION 5.1    Use OP-301A, Refueling Outage RCS Drain and Fill Operations for draining and filling the RCS.
SIP-1178                                Rev. 30                                    Page 179 of 207
 
ATTACHMENT 11 CONTINGENCIES 6.0    AIRLOCK LEAKAGE 6.1    PERSONNEL HATCH AIRLOCK RAX-1 IF the outer Personnel Airlock door is CLOSED to allow pressurization of the airlock due to excessive leakage from the inner door proceed as follows:
                                                                                        /
Initials/Date 6.1.1  PRESSURIZE the airlock to within 0.5 psi of 54 psig, accounting for instrument error of gauge used, per guidance of SP-181.
                                                                                        /
Initials/Date 6.1.2  ISOLATE air supply from airlock.
                                                                                        /
Initials/Date 6.1.3  INSTALL a test gauge at RAV-5/6 per Attachment 17
                                                                                        /
Initials/Date 6.1.4  CLOSE SAV-74
                                                                                        /
Initials/Date 6.1.5  OPEN SAV-75 to vent air supply
                                                                                        /
Initials/Date 6.2    EQUIPMENT HATCH AIRLOCK RAX-2 IF the outer Equipment Hatch Airlock door is CLOSED to allow pressurization of the airlock due to excessive leakage from the inner door proceed as follows:
                                                                                        /
Initials/Date SP-178                                Rev. 30                              Page 180 of 207
 
ATTACHMENT 11 CONTINGENCIES 6.2.1  PRESSURIZE the airlock to within 0.5 psi of 54 psig, accounting for instrument error of gauge used, per guidance of SP-1 81.
                                                                                          /
Initials/Date 6.2.2  ISOLATE air supply from airlock.
I/
Initials/Date 6.2.3  INSTALL a test gauge at RAV-7/8 per Attachment 17
                                                                                          /
Initials/Date 6.2.4  CLOSE SAV-72
                                                                                          /
Initials/Date 6.2.5  OPEN SAV-76 to vent air supply
                                                                                          /
Initials/Date 7.0  VERIFICATION TEST FLOWMETER CONTINGENCIES 7.1  INADEQUATE FLOWRATE AT STEP 4.2.6 IF the steps taken in 3.4.10 to improve flowrate to the Verification Test Flowmeters proved inadequate during step 4.2.6, proceed as follows:
7.1.1 CONNECT 1/2" I.D. hose (or greater) to the 1" tee at the inlets to LRV-64 and LRV-65.
                                                                                          /
Initials/Date SP-178                                  Rev. 30                                Page 181 of 207
 
ATTACHMENT 11 CONTINGENCIES 7.1.2 Run the hose to Penetration #116 Test Connection Isolation Valve LRV-1 16 and CONNECT hose to outlet of valve (pipe cap threads).
                                                                                          /
Initials/Date 7.1.3 Take necessary steps to ensure connection at LRV-1 16 is leak tight.
                                                                                          /
Initials/Date 7.1.4 REPEAT step 4.2.6 to check for leaks and to verify adequate flow is available through the rotameters FE-4 and/or FE-5.
                                                                                          /
Initials/Date 7.2  VERIFICATION TEST USING LRV-116:
7.2.1 OPEN LRV-45
                                                                                          /
Initials/Date 7.2.2 VERIFY LRV-46 CLOSED
                                                                                          /
Initials/Date 7.2.3 OPEN LRV-116
                                                                                          /
Initials/Date 7.2.4 OPEN LRV-64 (N/A if not chosen)
                                                                                          /
Initials/Date SP-178                                Rev. 30                              Page 182 of 207
 
ATTACHMENT 11 CONTINGENCIES 7.2.5 OPEN LRV-65 (N/A if not chosen)
I/
Initials/Date 7.2.6 RETURN to Step 4.5.3 and complete Verification Test.
                                                                      /
Initials/Date 7.3    RESTORE ALTERNATE PATH (IF USED):
7.3.1  CLOSE LRV-116
                                                                      /
Initials/Date 7.3.2 REMOVE hose and fittings from LRV-1 16
                                                                      /
Initials/Date 7.3.3 CAP LRV-1 16
                                                                      /
Initials/Date 7.3.4 CLOSE LRV-45
                                                                      /
Initials/Date SP-1 78                            Rev. 30                Page 183 of 207
 
ATTACHMENT 11 CONTINGENCIES 7.3.5 REINSTALL LRV-69 and LRV-63 and associated tubing removed in Step 3.4.10 up to and including tee at LRV-64 & LRV-65.
                                                                                  /
Initials/Date 7.3.6 REINSTALL LRV-66, LRV-67 and associated tubing if removed.
                                                                                  /
Initials/Date SP-178                                Rev. 30                        Page 184 of 207
 
ATTACHMENT 12 ILRT VERIFICATION TEST AND FLOW DATA (Page 1 of 3)
START TIME                              END TIME                            (Page          of START DATE                              END DATE TIME                                                      Ambient        CORRECTED Serial#____          Temperature      Pressure*            FLOW        INT.
*Ambient pressure reading is only required once - at beginning of Verification Phase.
The goal is to set and maintain 16 scfm for an imposed leak. Readings are taken at 15 minute intervals to match the data scan intervals on the ILRT computer.
The Verification Test typically lasts only 4-6 hours. Make additional gcopies of this sheet as necessary.
SP-178                                        Rev. 30                                    Page 185 of 207
 
ATTACHMENT 12 ILRT VERIFICATION TEST AND FLOW DATA (Page 2 of 3)
CALCULATE LO AS FOLLOWS:
A. If a rotometer is used to measure the imposed leak, correct its reading to actual conditions as follows:
Tc Fc =Fr PM X Tm Pc Where Fc    =      corrected flow.
Fr    =      reading from rotometer (LR-004-FI or LR-005-FI).
Pm    =      back pressure at rotometer during test (atmospheric).
Tm    =      temperature of flow through rotometer during verification test (LR-57-TI or Avg. Cntmnt Temp.).
Pc    =      pressure that rotometer calibration was performed at (from cal. sheet).
Tc    =      temperature rotometer calibration was performed at (from cal. sheet).
Instrument Used:                    (Serial #)
Pm    =                  psia Tm    =                  oR Pc    =                  psia Tc    =                  oR Fr    =                  SCFM B. Enter the corrected flow reading into the ILRT computer program. It will establish the acceptance criteria for the Verification Test results.
Fc value entered:              scfm SP-1 78                                    Rev. 30                              Page 186 of 207
 
ATTACHMENT 12 ILRT VERIFICATION TEST AND FLOW DATA (Page 3 of 3)
NOTE The ILRT Inc Data Management program automatically calculates L0 in % wt/day based on an input of atmospheric pressure on corrected flow (Fc). The following steps are performed solely to verify that the proper data was input into the computer program, and that the Upper and Lower Limits the computer displays are correct.
C. Calculate the L0 value imposed in weight % day using the following formula:
: 1.      Fc (in SCF/m) x 0.07517 Ibs/SCF x 1440 min/day = L0 in lbs/day.
: 2.      Fc (in Ibm/day):            +
: 3.      L, (in lbs/day)/Wt of Containment Air Mass at End of ILRT x 100 = L0 (in % wts/day).
: 4.      Mass value used:                          Ibm
: 5.      Lo =                %wt/day D. The Composite Leakage Rate (Lc), as measured by the ILRT Measurement System and calculated using the same analysis technique used to calculate the ILRT acceptance criteria, SHALL satisfy the following:
(Lo + Lam - 0.25 La)  -<Lc - (Lo + Lam+ 0.25. La)
Lower Limit      Lc    Upper Limit Where:
Lo=                  %wt/day (value from Section 2.0, C.3 above)
Lam =              %wt/day (from Step 6.4.6.A.2)
SP-1 78                                      Rev. 30                          Page 187 of 207
 
ATTACHMENT 13 INTENTIONALLY LEFT BLANK SP-1 78 Rev. 30                      Page 188 of 207
 
ATTACHMENT 14 CONTROL ROOM LOG (Page 1 of 2)
HOURLY READINGS:
Record the following readings to provide potential correlations between any leakage change and changes in the containment net free volume. Manually recording these readings is NOT required if a Trend Report is established on plant computer. IF manual readings are taken, THEN record hourly. Attach Trend Report printouts to Attachment 16, Computer Printouts and Attachments.
Trend reports should read every 15 minutes, print hourly.
TIME:        Przr Level          Przr Level        Rx Sump          Rx Sump              OTSG A      OTSG B          RCDT Level      Core Flood      Core Flood RC-001-LIRI        RC-001-LIR3          Level              Level              LEVEL      LEVEL            WD-23-LI1          Tank A          Tank B WD-222-LI        WD-302-LI            SP-1A-LI1    SP-1B-LI1                            CF-2-LI1        CF-2-LI3 F                -I-                4-                4                  4                4            F                4                4 _________
F                +                  4-                4                  4                4            F                4                4 F                +                  4-                4                  4                4            F                4                4 F                +                  4-                4                  4                4            F                4                4 F                +                  +                  4                  4                4            4                4                4 F                +                  +                  4                  4                4            4                4                4
_______________ -I- ______________    _____________  +/- ______________    +/- ______________ I          - I ______________ I ______________ I ______________
Make additional copies if necessary SP-1 78                                                    Rev. 30                                      Page 189 of 207
 
ATTACHMENT 14 CONTROL ROOM LOG (Page 2 of 2)
START AND END OF ILRT HOLD READINGS:
The following readings are required at the start and end of the ILRT Hold Test, and will be used in 5 to correct the ILRT results for any influence volume changes may have had on the leakage rate.
TANK/VOLUME                                                    LEVEL    CHANGE DESCRIPTION                    START            END          CHANGE    (Gallons)
RB SUMP LEVEL (FT):
PRESSURIZER (inches):
RCDT (inches):
CORE FLOOD TANK A (FT)
CORE FLOOD TANK B (FT)
TOTAL CHANGE (TG):
START AND END OF VERIFICATION TEST READINGS:
The following readings are required at the start and end of the Verification Test, and will be used to correct the Verification Test results for any influence volume changes may have had on the leakage rate.
TANK/VOLUME                                                    LEVEL    CHANGE DESCRIPTION                    START            END          CHANGE    (Gallons)
RB SUMP LEVEL (FT):
PRESSURIZER (inches):
RCDT (inches):
CORE FLOOD TANK A (FT)
CORE FLOOD TANK B (FT)
TOTAL CHANGE (TG):
Conversion Factors:
1 inch changes in RB SUMP level =                        gallons 1 inch change in PRESSURIZER level =                          gallons 1 inch change in RCDT level =                      gallons 1 FT change in CFT A level =                    gallons 1 FT change in CFT B level =                    gallons SP-178                                        Rev. 30                            Page 190 of 207
 
ATTACHMENT 15 ILRT RESULTS
 
==SUMMARY==
 
(Page 1 of 8) 1.0    VOLUME CHANGE CORRECTIONS 1.1    QUANTIFY VOLUME CHANGES:
1.1.1  Data comes from Attachment 14, (Control Room Log). Maintain the correct sign convention throughout this calculation, as we are correcting for the net change in free volume (i.e. some levels may go up, others may go down). A decrease in tank level is NEGATIVE, conversely an increase in a tank or sump level is POSITIVE. Ultimately, the changes will be converted to a %wt/day correction.
1.1.2 NET LEVEL DECREASE: If the net change was negative, the containment net free volume increased, causing the pressure to drop and the leakage to look larger than it should have.
In this case a SUBTRACTION is allowed from the ILRT leakage rate results.
1.1.3 NET LEVEL INCREASE: Conversely, if the net level change was positive, the containment net free volume decreased, masking the actual leakage and an ADDITION is required.
Net volume change from Attachment 14 in gallons:                    GALLONS 1.2    CONVERT GALLONS TO FT3 CHANGES:
Record ILRT duration (hours) = (t)                Duration =        hrs Calculate net volume change in ft3/day:
dV = (TG/t) (24 hrs/day) (lft3 / 7.48 gal.)
Where: dV = net containment volume change TG = sum of level changes in gallons (from table above) t = test duration in hours dV = (_    gallons/      hours) (24) (0.13367 ft3 / gallon) dV =                  ft3 / day SP-1 78                                        Rev..30                            Page 191 of 207
 
ATTACHMENT 15 ILRT RESULTS
 
==SUMMARY==
 
(Page 2 of 8) 1.3    CALCULATE NET FREE VOLUME CHANGE IMPACT IN %WT/DAY:
LV = (dV
* Pt
* C " 100)/ (R
* T
* W)
Where:        LV is the volume change in %wt/day dV is the net volume change in ft3 / day from Step 1.2 above Pt is the average containment pressure during the ILRT in psia C is the conversion factor, 144 in2 / ft2 R is the gas constant for air = 53.35 ft lbf / Ibm oR T is the average containment temperature in oR W is the average weight of the containment air in Ibm (use intercept of least squares fit line)
LV = (.__        *        - 144  *100)/(53.35*
* __-
Step B      Pt                        T          W LV=                %wt/day SP-1 78                                        Rev. 30                            Page 192 of 207
 
ATTACHMENT 15 ILRT RESULTS
 
==SUMMARY==
 
(Page 3 of 8)
NOTE Reference Step 1.1 for guidance pertaining to sign convention and addition/subtraction requirements.
2.0    PRELIMINARY TYPE B & C PENALTY ADDITIONS 2.1    Total of as-left MNPLR for penalty additions from Attachment 9, Containment Penetration Summary:
Total Penalty Addition (sccm):
2.2    Convert the MNPLR Penalty Addition to Ibm/day:
Penalty Addition = (      sccm)(1 scf/28,317scc)(0.07517 !bm/scf)(1440 min/day)
Penalty Addition (in Ibm/day) =
2.3    Convert the Ibm/day Penalty Addition to %wt/day value:
Penalty Addition (in Ibm/day) = (.      Ibm/day
* 100) /              initial containment Step 2.2                air mass (Ibm)
Penalty Addition (%wt/day) =
SP-1 78                                      Rev. 30                                Page 193 of 207
 
ATTACHMENT 15 ILRT RESULTS
 
==SUMMARY==
 
(Page 4 of 8) 3.0    PRELIMINARY LEAKAGE SAVINGS CALCULATION 3.1    Total of leakage savings for as-found ILRT calculation from Attachment 9, Containment Penetration Summary:
Leakage Savings Addition (sccm):
3.2    Convert the Leakage Savings Addition to Ibm/day:
Leakage Savings Addition = (      sccm)(1 scf/28,317scc)(0.07517 Ibm/scf)(1440 min/day)
Leakage Savings Addition (in Ibm/day) =
3.3    Convert the Ibm/day Leakage Savings Addition to %wt/day value:
Leakage Savings Addition (in Ibm/day) = (.      Ibm/day
* 100) /              initial containment Step 3.2                air mass (Ibm)
Leakage Savings Addition (%wt/day) =
(This calculation will need to be repeated, COPY this page as necessary)
SP-1 78                                      Rev. 30                                Page 194 of 207
 
ATTACHMENT 15 ILRT RESULTS
 
==SUMMARY==
 
(Page 5 of 8) 4.0    FINAL TYPE B & C PENALTY ADDITIONS 4.1    The preliminary ILRT results will be based on existing local leakage rate results, some of which may be replaced with tests performed after the ILRT. When all local leakage rate testing is completed, enter the results on Attachment 9, Containment Penetration Summary and calculate the total of as-left MNPLR for penalty additions:
Total Penalty Addition (sccm):
4.2    Convert the MNPLR Penalty Addition to Ibm/day:
Penalty Addition = (      sccm)(1 scf/28,317scc)(0.07517 Ibm/scf)(1440 min/day Penalty Addition (in Ibm/day) =
4.3    Convert the Ibm/day Penalty Addition to %wt/day value:
Penalty Addition (in Ibm/day) =  (        Ibm/day
* 100) /              initial containment Step 4.2                  air mass (Ibm)
Penalty Addition (%wt/day) =
SP-1 78                                      Rev. 30                                Page 195 of 207
 
ATTACHMENT 15 ILRT RESULTS
 
==SUMMARY==
 
(Page 6 of 8) 5.0    FINAL LEAKAGE SAVINGS CALCULATION 5.1    The preliminary ILRT results will be based on existing local leakage rate results, some of which may be replaced with tests performed after the ILRT. If maintenance is perfomed on components NOT exposed to the ILRT test pressure, any leakage savings must be included in the Final As-Found ILRT results. When all local leakage rate testing is completed, enter the results on Attachment 9, Containment Penetration Summary and calculate the total leakage savings for as-found ILRT calculation from Attachment 9, Containment Penetration Summary:
Leakage Savings Addition (sccm):
5.2    Convert the Leakage Savings Addition to Ibm/day:
Leakage Savings Addition = (_sccm)(1scf/28,317scc)(0.07517          Ibm/scf)(1440 min/day)
Leakage Savings Addition (in Ibm/day) =
5.3    Convert the Ibm/day Leakage Savings Addition to %wt/day value:
Leakage Savings Addition (in Ibm/day) = (      Ibm/day
* 100) /              initial containment Step 5.2                  air mass (Ibm)
Leakage Savings Addition (%wt/day) =
(This calculation may need to be repeated COPY this page as necessary)
SP-1 78                                      Rev. 30                                Page 196 of 207
 
ATTACHMENT 15 ILRT RESULTS
 
==SUMMARY==
 
(Page 7 of 8) 6.0    PRELIMINARY AS-LEFT ILRT RESULTS:
CHECK box for results used to accept ILRT 6.1 MEASURED LEAKAGE:
MASS POINT (ANSI 56.8-1994)
N/A I TOTAL TIME (BN-TOP-1)
Lull 6.2 REGRESSION LINE LEAKAGE Lam:
6.3 LEAKAGE AT 95%UCL:
6.4 MNPLR Penalty Additions (from 2.3) 6.5 Volume Change Correction (from 1.3) 6.6 PRELIMINARY AS-LEFT ILRT Result:
                                    ~IIz                  IZZI 7.0    PRELIMINARY AS-FOUND ILRT RESULTS USE results used to accept ILRT 7.1 AS-LEFT ILRT MASS POINT (ANSI 56.8-1994)  IZr TOTAL TIME (BN-TOP-1)    LIZ RESULT (from 6.6):              N/A 7.2 LEAKAGE SAVINGS (from 3.3):
7.3 PRELIMINARY AS-FOUND ILRT Result:
ZIZI SP-1 78                                    Rev. 30                Page 197 of 207
 
ATTACHMENT 15 ILRT RESULTS
 
==SUMMARY==
 
(Page 8 of 8) 8.0    FINAL AS-LEFT ILRT RESULTS CHECK box for results used to accept ILRT MASS POINT (ANSI 56.8-1994)    D- TOTAL TIME (BN-TOP-1)      D-8.1 MEASURED LEAKAGE:                          N/A 8.2 REGRESSION LINE LEAKAGE Lam:
8.3 LEAKAGE AT 95%UCL:
8.4 MNPLR Penalty Additions (from 4.3) 8.5 Volume Change Correction (from 1.3) 8.6 FINAL AS-LEFT ILRT Result:(<75%La)            [
I                  "I'l 9.0    FINAL AS-FOUND ILRT RESULTS USE results used to accept ILRT MASS POINT            TOTAL TIME (ANSI 56.8-1994)  D  (BN-TOP-1)    L-Z 9.1 AS-LEFT ILRT RESULT (from 8.6):              N/A 9.2 LEAKAGE SAVINGS (from 5.3):
9.3 FINAL AS-FOUND ILRT Result:
SP-1 78                                    Rev. 30                    Page 198 of 207
 
ATTACHMENT 16 COMPUTER PRINTOUTS AND ATTACHMENTS (Page 1 of 1)
The purpose of this attachment is to provide a single location in the procedure for collecting computer printouts from the plant computer trend report, the ILRT data management computer and other sources LIST OF PRINTOUTS AND ADDITIONAL ATTACHMENTS:
Make additional copies if needed SP-178                                      Rev. 30                              Page 199 of 207
 
ATTACHMENT 17 GAUGE INSTALLATION / REMOVAL SHEET Test gauges are used in various locations to monitor pressure in spaces/voids as an early indication of leakage from containment, or to indicate leakage between boundaries. The ILRT Test Supervisor may direct installation of additional test gauges when troubleshooting potential leakag e paths. Use this attachment to document installation and removal of these test gauges.
REMOVED CONC VERIF GAUGE          CAL                                                                                            INSTALLED Serial#        DUE      RANGE        MONITORED AREA/ PURPOSE                  GAUGE LOCATION                (Initials/  (Initials/ (Initials Date)      Date)      nDatei "PI-PS" Monitor space between          Purge Duct Outside RB, AHV-24 0-60 psig  Purge Supply Valves AHV-1 C and AHV-1D "PI-PE" Monitor space between          Purge Duct Outside RB , AHV-25 0-60 psig  Purge Exhaust Valves AHV-1A and AHV-1B 0-60 psig  "PI-SGA" Main Steam Line              PX Conn. VIv MSV-505 0-60 psig  "PI-SGB" Main Steam Line              PX Conn. VIv MSV-509 "PI-P" Between Personnel Lock          Outer Door Pressurization Tap, 0-60 psig  RAX-1 Doors                            RAV-5 "PI-PHS" Personnel Hatch, RAX-1,      PX Conn. VIv SAV-75 0-60 psig  Seal "PI-EHPS" Personnel Hatch, RAX-        PX Conn. VIv SAV-76 0-60 psig  2, Personnel Seal "PI-EHS" Equipment Hatch, RAX-2,      PX Conn. VIv SAV-77 0-60 psig  Seal "PI-E" Between Equipment Lock          Outer Door Pressurization Tap, 0-60 psig  RAX-2 Doors                            RAV-7 0-60 psig  Reactor Building Pressure              Leak Rate Test Panel, LRV-41 0-100      RB Sump Isolation Valves              WDV-810 Test Connection psig IF Pressure Gages are directed to be installed to t roubleshoot leakage, THEN the following guidance should be used for installation AND removal.
(1)      A different gauge range may be used at the discretion of the Test Supervisor.
To Inst all                                                  To Remove
: 1. C lose root stop OR gauge isolation.                  1. Close root stop OR gauge isolation.
: 2. Remove any installed instrumentation.                2. Remove any installed instrumentation.
: 3. Innstall gauge as directed by Test Supervisor        3. Install instrumentation removed during installation
: 4. C)pen valve closed in step 1                          4. Open valve closed in step 1.
SP-178                                            Rev. 30                                Page 200 of 207
 
ATTACHMENT 17 GAUGE INSTALLATION / REMOVAL SHEET To install Steam Generator and other space-monitoring pressure gauges perform the following:
INIT PI-SGA @ A Main Steam Line
: 1. Close MSV-94/504/505.
: 2. Connect tubing downstream of MSV-505
: 3. Install test gauge downstream of MSV-505
: 4. Open MSV-94/504/505.
PI-SGB @ B Main Steam Line
: 1. Close MSV-96/508/509.
: 2. Connect tubing downstream of MSV-509
: 3. Install test gauge downstream of MSV-509
: 4. Open MSV-96/508/509.es press PI-PS, Between Purge Supply Isolation Valves
: 1. Close AHV-24 (Purge'Supply Test Connection).
: 2. Connect tubing downstream of AHV-24
: 3. Install test gauge downstream of AHV-24
: 4. Open AHV-24 (Purge Supply Test Connection).
PI-PE, Between Purge Exhaust Isolation Valves
: 1. Close AHV-25 (Purge Exhaust Test Connection).
: 2. Connect tubing downstream of AHV-25
: 3. Install test gauge downstream of AHV-25
: 4. Open AHV-25 (Purge Exhaust Test Connection).
*PI-P, Between Personnel Lock RAX-1 Doors
: 1. Close RAV-5 (Test Connection).
: 2. Connect tubing downstream of RAV-5
: 3. Install test gauge downstream of RAV-5
: 4. Open RAV-5 (Test Connection).
INIT SP-178                                    Rev. 30                          Page 201 of 207
 
ATTACHMENT 17 GAUGE INSTALLATION / REMOVAL SHEET INIT
*PI-E, Between Equipment Lock RAX-2 Doors
: 1. Close RAV-7 (Test Connection).
: 2. Connect tubing downstream of RAV-7
: 3. Install test gauge downstream of RAV-7
: 4. Open RAV-7 (Test Connection).
*These gauges are to be installed ONLY if associated Outer Door needs to be closed and the airlock pressurized.
PI-EHS, Equipment Hatch RAX-3 Seal
: 1. Close SAV-77 (Test Connection).
: 2. Connect tubing downstream of SAV-77
: 3. Install test gauge downstream of SAV-77
: 4. Open SAV-77 (Test Connection).
RB Sump Discharge Line
: 1. Close WDV-81 0 (Test Connection)
: 2. Remove cap at WDV-810
: 3. Install test gauge at WDV-810
: 4. Open WDV-810 (Test Connection)
PI-EHPS, Personal Hatch RAX-2 Seal
: 1. Close SAV-76 (Test Connection).
: 2. Connect tubing downstream of SAV-76
.3. Install test gauge downstream of SAV-76
: 4. Open SAV-76 (Test Connection).
PIPHS, Personnell Hatch RAX-1 Seal
: 1. Close SAV-75 (Test Connection).
: 2. Connect tubing downstream of SAV-75
: 3. Install test gauge downstream of SAV-75
: 4. Open SAV-75 (Test Connection).
INIT SP-178                                    Rev. 30                            Page 202 of 207
 
ATTACHMENT 17 GAUGE INSTALLATION / REMOVAL SHEET INIT Reactor Building Pressure
: 1. Close LRV-41 (Test Connection).
: 2. Connect tubing downstream of LRV-41
: 3. Install test gauge downstream of LRV-41
: 4. Open LRV-41 (Test Connection).
To remove Steam Generator/test monitoring pressure gauges perform the following:
PI-SGA @ A Main Steam Line
: 1. Close MSV-94/504/505.                                                                    __    (V)
: 2. Disconnect tubing downstream of MSV-505
: 3. Remove test gauge downstream of MSV-505
: 4. Recap line downstream of MSV-505.
: 5. OPEN MSV-94/504.                                                                        __    (V)
PI-SGB @ B Main Steam Line
: 1. Close MSV-96/508/509.                                                                      __(V)
: 2. Disconnect tubing downstream of MSV-509
: 3. Remove test gauge downstream of MSV-509
: 4. Recap the line downstream of MSV-509.
: 5. OPEN MSV-96/508                                                                            __(V)
PI-PS, Between Purge Supply Isolation Valves
: 1. Close AHV-24 (Purge Supply Test Connection).                                            __    (V)
: 2. Disconnect tubing downstream of AHV-24
: 3. Remove test gauge downstream of AHV-24
: 4. Replace cap downstream of AHV-24 (Purge Supply Test Connection).                        __    (V)
PI-PE, Between Purge Exhaust Isolation Valves
: 1. Close AHV-25 (Purge Exhaust Test Connection).                                            __    (V)
: 2. Disconnect tubing downstream of AHV-25
: 3. Remove test gauge downstream of AHV-25
: 4. Replace cap downstream of AHV-25 (Purge Exhaust Test Connection).                            (V)
INIT SP-1 78                                    Rev. 30                          Page 203 of 207
 
ATTACHMENT 17 GAUGE INSTALLATION / REMOVAL SHEET INIT PI-P, Between Personnel Lock RAX-1 Doors
: 1. Close RAV-5 (Test Connection).                                                  __(V)
: 2. Disconnect tubing downstream of RAV-5
: 3. Remove test gauge downstream of RAV-5
: 4. Replace cap downstream of RAV-5 (Test Connection).                              __(V)
PI-E, Between Equipment Lock RAX-2 Doors
: 1. Close RAV-7 (Test Connection).                                                  __(V)
: 2. Disconnect tubing downstream of RAV-7
: 3. Remove test gauge downstream of RAV-7
: 4. Replace cap downstream of RAV-7 (Test Connection).                                  (V)
PI-EHS, Equipment Hatch RAX-2 Seal
: 1. Close SAV-77 (Test Connection).                                                      (V)
: 2. Disconnect tubing downstream of SAV-77
: 3. Remove test gauge downstream of SAV-77
: 4. Replace cap downstream of SAV-77 (Test Connection).                              __(V)
RB Sump Discharge Line
: 1. Close WDV-81 0 (Test Connection)                                                __(V)
: 2. Remove test gauge at WDV-81 0
: 3. Replace cap downstream of WDV-81 0 (Test Connection)                            __(V)
PI-EHPS, Personal Hatch RAX-2 Seal
: 1. Close SAV-76 (Test Connection).                                                  __(V)
: 2. Disconnect tubing downstream of SAV-76
: 3. Remove test gauge downstream of SAV-76
: 4. Replace cap downstream of SAV-76 (Test Connection).                              __(V)
SP-1 78                                  Rev. 30                    Page 204 of 207
 
ATTACHMENT 17 GAUGE INSTALLATION / REMOVAL SHEET PIPHS, Personnell Hatch RAX-1 Seal
: 1. Close SAV-75 (Test Connection).                                                __ (V)
: 2. Disconnect tubing downstream of SAV-75
: 3. Remove test gauge downstream of SAV-75
: 4. Replace cap downstream of SAV-75 (Test Connection).                                (V)
Reactor Building Pressure
: 1. Close LRV-41 (Test Connection).                                                __ (V)
: 2. Disconnect tubing downstream of LRV-41
: 3. Remove test gauge downstream of LRV-41
: 4. Remove cap downstream of LRV-41 (Test Connection).                              __ (V)
SP-178                                    Rev. 30                  Page 205 of 207
 
ATTACHMENT 18 TEST GAUGE PRESSURE READINGS (Page 1 of 1)
Page    _  of PI-PS      PI-PE                              PI-EHPS,                  PI-EHS, TIME    PISGA A        OTG OTGDoors PISGB  B  Purge      Purge    PI-P, RAX-1  RAX-1  Seal PI-PHS,  RAX-2  Pers PI-EHPer        Doors PI-E,  RAX-2 RAX-2 Eq Eq.
Supply    Exhaust                              Htch Seal                Htch Seal Initial value:
Copy as needed for additional sheets SP-178                                Rev. 30                          Page 206 of 207
 
REVISION
 
==SUMMARY==
 
SECTION          DESCRIPTION A    Added valves MSV-93 & MSV-95 & associated transmitter isolation to valve checklist due to their absence in previous revision. A    Added new transmitter isolations MS 114/115/116/117 due to the installation of EC 65629 (MUR Upgrade MS PTs) (PRR 246921) 4.6.3.1.6        Changed AH-032-FIR (Channel D) to AH-1003 TIR (FE) (Channel 4) to correspond to the new recorder that was installed per EC 52417. E    Revised breaker list to match the breaker call outs in OP-700B for CFV-1 1, CFV-12, CFV-15, MUV-18, & MUV-27. (PRR 178147) 3.4.12            Deleted "and REMOVE" from the step. (PRR 178147) C    Added notes to identify the breakers for the WSV's, Added "CAPED" to WSV-7, and changed the restoration position of WSV-47 & 48 Removed previous notes that were no longer applicable. (PRR 178147) 7    Corrected the misidentification of RAV-7 as RAV-6. (PRR 178147) 7    Added Instructions to install and remove pressure instruments for PI-EHPS, Personnel Hatch RAX-2 Seal; PI-PHS, Personnel Hatch RAX-1 Seal; and Reactor Building Pressure. (PRR 178147) 6.1.2.3          Corrected the misidentification of PEN217-TV5 as PEN216-TV5. (PRR 178147)      Changed the steps for flushing the test piping/hose, due to their no longer Section 4.2.1.1 - being a need to flush Intermediate Building piping/hose. Corrected temporary 5.7 (pages 137-  valve naming. (PRR 178147) 140)
Reference        Replaced references to PM-1 56 with EGR-NGGC-0351, due to PM-1 56 being Documents &      superseded by EGR-NGGC-0351. (PRR 254243) 0 Section 1.1 B    Corrected the description for CAV-430 to read "RCP-1C Suction Sample Iso."
(PRR 174465)
SP-1 78                                    Rev. 30                            Page 207 of 207}}

Latest revision as of 02:28, 14 January 2025

SP-178, Revision 30 - Containment Leakage TEST-TYPE a Including Liner Plate
ML102920070
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/20/2010
From:
Progress Energy Co
To:
Office of Information Services
References
FOIA/PA-2010-0116 SP-178, Rev 30
Download: ML102920070 (207)