ML17055B534: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML17055B534
| number = ML17055B534
| issue date = 08/22/1985
| issue date = 08/22/1985
| title = Rev 0 to Nuclear Engineering & Licensing Procedure NEL-014.G, Control & Distribution of Vendor Documents.
| title = Rev 0 to Nuclear Engineering & Licensing Procedure NEL-014.G, Control & Distribution of Vendor Documents
| author name = Gresock G, Miles K, Wilczek S
| author name = Gresock G, Miles K, Wilczek S
| author affiliation = NIAGARA MOHAWK POWER CORP.
| author affiliation = NIAGARA MOHAWK POWER CORP.
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Enclosure E20 NIAGARA MOHAWK POWER CORPORATION NUCLEAR ENGINEERING ANO   LICEilSING PROCEOURE TITLE:   CONTROL ANO OISTRI8UT'ION OF VENOOR OOCUMENTS r
{{#Wiki_filter:Enclosure E20 NIAGARA MOHAWK POWER CORPORATION NUCLEAR ENGINEERING ANO LICEilSING PROCEOURE TITLE:
Procedure No:             NEL-O14.G                       Subject to periodic review by EAPRC Revision:                                                  Expiration   Oat'e:   Au9ust I987 Name                         Title                       Oate Prepared by:   General         Ph   sics Corp.               N/A                       8/5/85 Reviewed by:                                         Office Admini str ator 1 es Approved by:                                         M r. - Nuclear Oesi   n resoc M r.  - Nuclear Technolo y 1 cze r.
CONTROL ANO OISTRI8UT'ION OF VENOOR OOCUMENTS r
4r-C. 0. er M r. - Nuclear   En ineerin           gz/Z'5' M r. - Staff  Services                A/o-0
Procedure No:
                            . L. Nass EAPRC Acceptance:                                          EAPRC  Chairperson                 5//3/~
NEL-O14.G Revision:
                            . J. Gresock Paae 1 of 16
Subject to periodic review by EAPRC Expiration Oat'e:
'3177A                                                                         August    lo85 8604280282 00000410 8604i5'PDR ADDCR                       ',
Au9ust I987 Name Title Oate Prepared by:
PDR
General Ph sics Corp.
N/A 8/5/85 Reviewed by:
1 es Office Administr ator Approved by:
resoc M r. - Nuclear Oesi n
1 cze r.
4r-C. 0.
er
. L. Nass M r. - Nuclear Technolo y M r. - Nuclear En ineerin M r. - Staff Services gz/Z'5' A/o-0 EAPRC Acceptance:
. J.
Gresock EAPRC Chairperson 5//3/~
Paae 1 of 16
'3177A 8604280282 8604i5'PDR ADDCR 00000410 PDR August lo85


F f
F f


1.0 pURPOSE To   describe methods for the control and distribution of vendor documents by Nuclear Engineering and Licensing personnel, 2.0 SCCPE/REFERENCES/SOURCE       DOCUMENTS 2.1     Scooe This procedure applies to formal project-related vendor documents received by Nuclear Engineering and Licensing.
1.0 pURPOSE To describe methods for the control and distribution of vendor documents by Nuclear Engineering and Licensing personnel, 2.0 SCCPE/REFERENCES/SOURCE DOCUMENTS 2.1 Scooe This procedure applies to formal project-related vendor documents received by Nuclear Engineering and Licensing.
2.2   References The   following   documents may need to be referenced when using       this
2.2 References The following documents may need to be referenced when using this
          .procedure:
.procedure:
NEL<14       Document Control and   Distribution NEL-015       Procurement of Materials/Services NEL-015.C     Purchase Requisition Completion OA-014 .A     Technical Library OA-014 .C     Master Drawing Index FR-014 .C     Control and Distribution of Drawings 2 .3   Source Documents The   following   documents were used   in preparing this procedure:
NEL<14 Document Control and Distribution NEL-015 Procurement of Materials/Services NEL-015.C Purchase Requisition Completion OA-014.A Technical Library OA-014.C Master Drawing Index FR-014.C Control and Distribution of Drawings 2.3 Source Documents The following documents were used in preparing this procedure:
10CFR50, Appendix 8, Criteria     III and YI ANSI/ANS 3.2-1982, Section 5.2 .7 ANSI/ASME NQA-l-1983 and Addenda,       Sections   II-3 and II-6 and Supplements 3S-I and 65-1 NUREG-1000   Generic Implications of   ATWS   Events at the Salem Nuclear Power   Plant 3.0 DEFINITIONS 3.1   Controlled   Document - A document that specifies quality requirements or prescrs es   actlv>t>es   affecting quality that require special hanaling to ensure that correct documents are being employed. The document is traceable to holders at all times and is uniquely identified as controlled. Holders are kept informed of the latest available information through controlled distribution of subsequent issues and changes (i.e.,
: 10CFR50, Appendix 8, Criteria III and YI ANSI/ANS 3.2-1982, Section 5.2.7 ANSI/ASME NQA-l-1983 and Addenda, Sections II-3 and II-6 and Supplements 3S-I and 65-1 NUREG-1000 Generic Implications of ATWS Events at the Salem Nuclear Power Plant 3.0 DEFINITIONS 3.1 Controlled Document - A document that specifies quality requirements or prescrs es actlv>t>es affecting quality that require special hanaling to ensure that correct documents are being employed.
revisions and addenda). Examples of controlled documents include approved instructions, procedures, drawings, specifications, procurement documents, calculations, system descriptions, vendor documents, and the indexes for these documents.
The document is traceable to holders at all times and is uniquely identified as controlled.
NEL-014.G Page 2  of  16                                                          Revision 0 0177A                                                                      August 1985
Holders are kept informed of the latest available information through controlled distribution of subsequent issues and changes (i.e.,
revisions and addenda).
Examples of controlled documents include approved instructions, procedures, drawings, specifications, procurement documents, calculations, system descriptions, vendor documents, and the indexes for these documents.
Page 2 of 16 0177A NEL-014.G Revision 0
August 1985


3.2     Uncontrolled Oocument - A document that may be distributed without traceabi ity to no ders. Holders of uncontrolled documents will not autOmatiCally reCeiVe SubSequent iSSueS Or ChangeS.
3.2 3.3 Uncontrolled Oocument - A document that may be distributed without traceabi ity to no ders.
3.3    Vendor Oocument - Vendor-supplied             information relevant to the operation are defined as drawings, technical manuals, and documentation packages.
Holders of uncontrolled documents will not autOmatiCally reCeiVe SubSequent iSSueS Or ChangeS.
3.4     Technical Manuals -           A standard manual issued by vendors that describes maintenance.       Tech Manuals       should include recommended   spare parts.
Vendor Oocument - Vendor-supplied information relevant to the operation are defined as drawings, technical
3.5     Vendor   Or awin     - A graphical representation issued by vendors that provi es   in   erface     design information to engineering personnel such       as dimensions, electrical interconnect requirements, mounting requirements, etc.
: manuals, and documentation packages.
3.6     Vendor Oocumentation Packa e (Ooc. Package) - A collection of data su mi e       y     e ven or wi         shipment of the component that is used by site personnel     to perform receipt inspection.
3.4 Technical Manuals - A standard manual issued by vendors that describes maintenance.
3.7    En ineerin     Orawin       Control Clerk - As used in this procedut e, refers o   e c   er   s   assigne to arawing control.
Tech Manuals should include recommended spare parts.
4.0   RESPONSI   BILITIES 4,1     The responsible engineer ensures that vendor documents receive proper reviews by project team members and other NMPC departments involvea with the project before distribution and use.
3.5 Vendor Or awin
4.2    Under the   direction of the Office Administr ator and guidance of responsible engineers and Lead Oiscipline Engineers, the engineering drawing control clerk orocesses vendor documents in accordance with the instructions of this orocedure.
- A graphical representation issued by vendors that provi es in erface design information to engineering personnel such as dimensions, electrical interconnect requirements, mounting requirements, etc.
5.0   ?REREDUISITES vendor documents are specified as part of the procurement process.
3.6 3.7 Vendor Oocumentation Packa e
Resoonsible enqineers performing procurement must specify timely suomit-al of vendor documents ensuring appropriate cooies. The following is recommended:
(Ooc. Package)
: a. Vendor Orawings         - 1 reproducible for comment before .abrication
- A collection of data su mi e
: b. Tech Manual     -   2   copies befor e shipment
y e ven or wi shipment of the component that is used by site personnel to perform receipt inspection.
: c. Ooc. Package       -  2   copies upon shipment (one cooy to Syracuse,   one copy with the shipment) 6.0   PROCEOURE 6.1   SpeCif in     Vendpr OOCumentS 6.1.1     The   responsible en)i'beer shall speci y vendor document requirements         during the procurement process (refer to Procedures NEL-015 and NEL-015.C)           ~
En ineerin Orawin Control Clerk - As used in this procedut e, refers o
NEL-014.G Page 3  of  16                                                                  Revision 0 0177A                                                                          August 1985
e c er s
assigne to arawing control.
4.0 RESPONSI BILITIES 4,1 4.2 The responsible engineer ensures that vendor documents receive proper reviews by project team members and other NMPC departments involvea with the project before distribution and use.
Under the direction of the Office Administr ator and guidance of responsible engineers and Lead Oiscipline Engineers, the engineering drawing control clerk orocesses vendor documents in accordance with the instructions of this orocedure.
5.0
?REREDUISITES vendor documents are specified as part of the procurement process.
Resoonsible enqineers performing procurement must specify timely suomit-al of vendor documents ensuring appropriate cooies.
The following is recommended:
a.
Vendor Orawings -
1 reproducible for comment before.abrication b.
Tech Manual - 2 copies befor e shipment c.
Ooc.
Package 2 copies upon shipment (one cooy to Syracuse, one copy with the shipment) 6.0 PROCEOURE 6.1 SpeCif in Vendpr OOCumentS 6.1.1 The responsible en)i'beer shall speci y vendor document requirements during the procurement process (refer to Procedures NEL-015 and NEL-015.C)
~
Page 3 of 16 0177A NEL-014.G Revision 0
August 1985


6.1.2   The   responsible engineer shall state which documents are to oe submitted for review (before fabrication) and whicn documents are to be submitted for information only.
6.1.2 The responsible engineer shall state which documents are to oe submitted for review (before fabrication) and whicn documents are to be submitted for information only.
6.1.3   The   responsible engineer shall specify copy requir ements (refer to Section 5.0 for guidance).
6.1.3 The responsible engineer shall specify copy requir ements (refer to Section 5.0 for guidance).
6.2 Vendor Oocument Review C cle       - Refer to Attachment NEL-014.G-1     for a owchar o       is process .
6.2 Vendor Oocument Review C cle - Refer to Attachment NEL-014.G-1 for a owchar o
6.2.1   Vendor documents       submitted for review are received by the responsible engineer.
is process 6.2.1 Vendor documents submitted for review are received by the responsible engineer.
6.2 .2 The   responsible engineer:
6.2.2 The responsible engineer:
: a. Reviews the     submittal for completeness
a.
: b. Oetermines     internal review requirements
Reviews the submittal for completeness b.
: c. Transmits the submittal to the Office Administrator/engineering clerk for distribution 6<<2.3  The   Office Administrator/engineering clerk:
Oetermines internal review requirements 6<<2.3 c.
: a. I.ogs in receipt of documents     in Master Orawing Index per Procedure OA-014.C
Transmits the submittal to the Office Administrator/engineering clerk for distribution The Office Administrator/engineering clerk:
: b. Stamps   original   as received (Refer to Attachment, NEL-014.G-2)
a.
: c. Obtains review prints From Files and Reproduction using Attachment NEL-014.G-3
I.ogs in receipt of documents in Master Orawing Index per Procedure OA-014.C b.
: d. prepares   review transmittal Assembles   review packages
Stamps original as received (Refer to Attachment, NEL-014.G-2) c.
: f. Oistributes review packages for internal review '.ndicat'.ng required completion date 6.2.4  Engineers and designers, receiving the transmittal, review vendor documents and submit comments to the Office Admini-strator/engineering clerk by the required date.           If rhere are no conments     the engineer/designer     shall so indicate.
Obtains review prints From Files and Reproduction using Attachment NEL-014.G-3 6.2.4 6<<2 <<5 d.
6<<2 <<5  ~jpon receipt of comments, the Office hdministrator/engineering clerk:
prepares review transmittal Assembles review packages f.
Assembles   comments NE'-014 . G
Oistributes review packages for internal review '.ndicat'.ng required completion date Engineers and designers, receiving the transmittal, review vendor documents and submit comments to the Office Admini-strator/engineering clerk by the required date.
?age 4 of 16                                                           Revision 0 0177A                                                                   August 1985
If rhere are no conments the engineer/designer shall so indicate.
: b. Contacts individuals not having submitted coments,          if necessary
~jpon receipt of comments, the Office hdministrator/engineering clerk:
: c. Transmits coaments to the responsible engineer with the vendor's original reproducible 6.2.6 The responsible engineer:
Assembles comments
: a. Reviews and resolves co+vents
?age 4 of 16 0177A NE'-014. G Revision 0
: b. Consolidates contents on vendor's reproducible using drafting assistance as required
August 1985
: c. Stamps  reproducible  as  applicable (Refer to Attachment NEL-014.6-4)
: d. Prepares  transmittal letter to vendor
: e. Transmits letter and original to the Office Administrator/engineering clerk for distribution 6.2.7 The Office Administrator/engineering clerk:
: a. Logs the  transmittal in the Haster Orawing Index per Procedure OA-014.C
: b. Obtains prints for    distribution    from Files and Reproduction Rote:    For those documents      that are indicated as "Accepted" the transmittal to the vendor need not include copies of the document. For those documents indicated as "Accepted arith Changes Noted" or "Not Acceoted" a print of the document shall  be  included.
: c. Transmits package to vendor
: d. Oistribute copies of tr ansmittal internally per transmittal instructions provided by the responsible engineer 6.2.8 The vendo~,  upon  receiving the vendor document review transmittal:
: a. Proceeds  with fabrication    and  incorporates any comments or uEL-014.G Page  5 of 16                                                          Revision 0 0177A                                                                  August 1985
: b. Ooes  not proceed with fabrication and resubmits revised documents    in accordance with the instructions within the transmittal. Resubmittals are treated as new drawings starting with Step 6.2.1. If the vendor has been instructed to proceed with fabrication, the next document transmittal will be the as-built transmittal.
6.3  As-Built  Vendor Oocuments 6.3.1  ~0rawin s
: a. The  responsible engineer receives      final as-built            vendor drawings before shipment.
: b. The  responsible engineer reviews the drawings and transmits to the Offi ce Admi ni str ator/engineer ing c 1 erk for distribution.
C ~  The  Office Administrator/engineering clerk:
: 1. Logs in receipt of final    as-built drawings in the Master Orawing Index
: 2. Stamps  the drawings  as  "As-Built"
: 3. Obtains copies for    distribution
: 4. Prepares  transmittal
: 5. Obtains Lead Engineer approval of transmittal
: 5. Oistributes transmittal to:
o  Site Records 'management - reoroducible 1
o  Project Personnel - as instructed o  Project File - original
: d. The responsible engineer shall ensur e that previous r evisions of dr awings entered into the Master Orawing Index are stamped as "superceded" upon receipt of a new revision. Ahen a vendor drawing is assigned an number the vendor drawing    shall also  be stamoed AMP'rawing "superceded".
5.3.2  Tech Manuals
: a. The  responsible engineer receives,. at a ~inimum, two (2) copies of the Tech Manual(s) before shioment.
NEL-014.G Paqe 6  of 16                                                          Revision      O 0177A                                                                  August 1985


bThe responsible engineer:
b.
: 1. Reviews the manual
Contacts individuals not having submitted coments, if necessary c.
: 2. Resolves    any comments  with the vendor
Transmits coaments to the responsible engineer with the vendor's original reproducible 6.2.6 The responsible engineer:
: 3. Prepares    transmittal including    any special instructions in the use of the      manual such as applicablity, cautions, etc.
a.
Note:      The  transmittal shall state that the manual is not to be' evised without prior review of revisions by Nuclear Engineering.
Reviews and resolves co+vents 6.2.7 b.
: 4. Transmits two copies of the manual        and the transmittal to the Office Administrator.
Consolidates contents on vendor's reproducible using drafting assistance as required c.
: c. The Office Administrator/engineering clerk:
Stamps reproducible as applicable (Refer to Attachment NEL-014.6-4) d.
: 1. Logs   in, receipt of the manual(s) in the Master Orawing Index 2,    Stamps  the manuals "Controlled" in red ink
Prepares transmittal letter to vendor e.
: 3. Oistributes the manual:
Transmits letter and original to the Office Administrator/engineering clerk for distribution The Office Administrator/engineering clerk:
o    One  copy to Site Records Management o    One  copy to the Nuclear Engineering Libr      ry Note:      Revisions to Tech Manuals shal 1 be handl ed in the same fashion as original submit als.
a.
6.3.3  Oocumentation Packa    e
Logs the transmittal in the Haster Orawing Index per Procedure OA-014.C b.
: a. Both the Site and the responsible engineer receive a :ooy of the Oocumentation      Package upon shipment or the i-.em.
Obtains prints for distribution from Files and Reproduction Rote:
: b. The responsible engineer:
For those documents that are indicated as "Accepted" the transmittal to the vendor need not include copies of the document.
: 1. Reviews the package      for completeness
For those documents indicated as "Accepted arith Changes Noted" or "Not Acceoted" a print of the document shall be included.
: 2. Assists Site personnel      as requested  in receiot inspection
6.2.8 c.
: 3. Transmits the package to the Office Administrator to file in the Project File 7.0    ATTACHMENTS NEL-014.G-I    Vendor Oocument Control Plowchart NEL-014.G-2    Vendor Oocument Receipt Stamp NEL-014.G-3    Print Request Form NEL-014.G-4    Vendor Oocument Review Stamp NEL-014.G Page 7  of 16                                                          Revision 0 0177A                                                                  August 1985
Transmits package to vendor d.
Oistribute copies of tr ansmittal internally per transmittal instructions provided by the responsible engineer The vendo~,
upon receiving the vendor document review transmittal:
a.
Proceeds with fabrication and incorporates any comments or Page 5 of 16 0177A uEL-014.G Revision 0
August 1985


ATTACHMENT HEL 014 ~ C-1 VENDOR DOCUNERZ COHZROL PLOWCHART Page   1 of 6 Vendor Documents Received by Responsible Eng.
b.
Ooes not proceed with fabrication and resubmits revised documents in accordance with the instructions within the transmittal.
Resubmittals are treated as new drawings starting with Step 6.2.1.
If the vendor has been instructed to proceed with fabrication, the next document transmittal will be the as-built transmittal.
6.3 As-Built Vendor Oocuments 6.3.1
~0rawin s
a.
The responsible engineer receives final as-built vendor drawings before shipment.
b.
The responsible engineer reviews the drawings and transmits to the Office Administr ator/engineer ing c 1 erk for distribution.
C ~
The Office Administrator/engineering clerk:
1.
Logs in receipt of final as-built drawings in the Master Orawing Index 2.
Stamps the drawings as "As-Built" 3.
Obtains copies for distribution 4.
Prepares transmittal 5.
Obtains Lead Engineer approval of transmittal 5.
Oistributes transmittal to:
d.
o Site Records
'management 1 reoroducible o
Project Personnel
- as instructed o
Project File - original The responsible engineer shall ensur e that previous r evisions of dr awings entered into the Master Orawing Index are stamped as "superceded" upon receipt of a new revision.
Ahen a vendor drawing is assigned an AMP'rawing number the vendor drawing shall also be stamoed "superceded".
5.3.2 Tech Manuals a.
The responsible engineer receives,. at a ~inimum, two (2) copies of the Tech Manual(s) before shioment.
Paqe 6 of 16 0177A NEL-014.G Revision O
August 1985
 
b; The responsible engineer:
1.
Reviews the manual 2.
Resolves any comments with the vendor 3.
Prepares transmittal including any special instructions in the use of the manual such as applicablity, cautions, etc.
Note:
The transmittal shall state that the manual is not to be' evised without prior review of revisions by Nuclear Engineering.
4.
Transmits two copies of the manual and the transmittal to the Office Administrator.
c.
The Office Administrator/engineering clerk:
1.
Logs in, receipt of the manual(s) in the Master Orawing Index 2,
Stamps the manuals "Controlled" in red ink 3.
Oistributes the manual:
o One copy to Site Records Management o
One copy to the Nuclear Engineering Libr ry Note:
Revisions to Tech Manuals shal 1 be handl ed in the same fashion as original submit als.
6.3.3 Oocumentation Packa e
a.
Both the Site and the responsible engineer receive a :ooy of the Oocumentation Package upon shipment or the i-.em.
b.
The responsible engineer:
1.
Reviews the package for completeness 2.
Assists Site personnel as requested in receiot inspection 3.
Transmits the package to the Office Administrator to file in the Project File 7.0 ATTACHMENTS NEL-014.G-I NEL-014.G-2 NEL-014.G-3 NEL-014.G-4 Vendor Oocument Control Plowchart Vendor Oocument Receipt Stamp Print Request Form Vendor Oocument Review Stamp Page 7 of 16 0177A NEL-014.G Revision 0
August 1985
 
ATTACHMENT HEL 014 ~ C-1 VENDOR DOCUNERZ COHZROL PLOWCHART Page 1 of 6
Vendor Documents Received by Responsible Eng.
Document Package Transmitted to Office Admin.
Document Package Transmitted to Office Admin.
Office Admin.
Office Admin.
Logs in Receipt           Master Drawing and Stamps                  Index Or iginal Office   Admin.
Logs in Receipt and Stamps Original Master Drawing Index Office Admin.
Prepares   Internal Review   Transmittal Office Admin.
Prepares Internal Review Transmittal Office Admin.
Obtains Prints             Reproduc 'on for Reviev Office Admin.
Obtains Prints for Reviev Reproduc
'on Office Admin.
Assembles Review Package Office Admin.
Assembles Review Package Office Admin.
Receives Comments Office Admin.
Receives Comments Office Admin.
Assembles Comments
Assembles Comments
                                              .tEL-014. 0
?age 8 of 16 0177A
?age 8 of 16                                  Revision   0 0177A                                          August       '985
.tEL-014. 0 Revision 0
August
'985


ATTACHMENT NEL 014m G-1 VENDOR DOCUMENT CONTROL FLOWCHART Page 2 of 6 Office Admin.
ATTACHMENT NEL 014m G-1 VENDOR DOCUMENT CONTROL FLOWCHART Page 2 of 6
Transmits Cement Package to Responsible Eng.
Office Admin.
Transmits Cement Package to Responsible Eng.
Responsible Eng.
Responsible Eng.
Resolves Comments Responsible   Eng.
Resolves Comments Responsible Eng.
Consolidates               Drafting Comments Reproducible is Stamped and Signed by Responsible Eng.
Consolidates Comments Drafting Reproducible is Stamped and Signed by Responsible Eng.
Responsible Eng.
Responsible Eng.
Prepares Transmittal Letter to Vendor Office Admin.         Master Draving Index Logs  in Receipt Office Admin.             Reproduction Obtains Prints Office Admin.
Prepares Transmittal Letter to Vendor Office Admin.
Transmits Comments to Vendor Office Admin.
Logs in Receipt Master Draving Index Office Admin.
Makes Internal       NEL<<014. Q Page 9 of 16              Distr ibution        Revision   0 9177A                                          August       '985
Obtains Prints Reproduction Office Admin.
Transmits Comments to Vendor Page 9 of 16 9177A Office Admin.
Makes Internal Distribution NEL<<014. Q Revision 0
August
'985


                          ~
~
ATTACHMENT NEL-014m G 1 VENDOR OOCVMENT CONTROL FLOWCHART Page   3 of 6 Not Accepted                       Cananents               Accepted wl'Comments Vendor Does Hot Proceed                   Accepted with Pabrication Vendor Resubaits           Vendor Proceeds               Vendor Proceeds Document                      with                         with Per Date Established            Fabrication                    Pabrication Resubmitted                                           Vendor Resubmits is treated                                              if Requested as new                                                in Transmittal Submittal Vendor                        Vendor Comple tes                     Completes Pabr ication                   Fabrication Vendor Submits As-Built Documents Pinal             Tech             Doc. Package Drawings            Manual (see Page 4)       (see Page 5)         (see Page 6)
ATTACHMENT NEL-014m G 1 VENDOR OOCVMENT CONTROL FLOWCHART Page 3 of 6
VEL-01 4. 0 Page  10 of  16                                                      Revision   0 0177A                                                                Augus-       1985
Not Accepted Cananents Accepted wl'Comments Vendor Does Hot Proceed with Pabrication Accepted Vendor Resubaits Document Per Date Established Vendor Proceeds with Fabrication Vendor Proceeds with Pabrication Resubmitted is treated as new Submittal Vendor Resubmits if Requested in Transmittal Vendor Comple tes Pabr ication Vendor Completes Fabrication Vendor Submits As-Built Documents Pinal Drawings Tech Manual Doc.
Package (see Page 4)
(see Page 5)
(see Page 6)
Page 10 of 16 0177A VEL-014. 0 Revision 0
Augus-1985


ATACHMER'EL 014e Q-I VENDCR DOCUMENT CONTROL PLQMCHART Page           4 of       6 Final Drawings Received and                 (1 reproducible)
ATACHMER'EL 014e Q-I VENDCR DOCUMENT CONTROL PLQMCHART Page 4 of 6
Reviewed by Responsible Eng.
Final Drawings Received and Reviewed by Responsible Eng.
(1 reproducible)
Responsible Eng.
Responsible Eng.
Transmits to Office Admin.
Transmits to Office Admin.
Office Admin.
Office Admin.
Logs                   Master Drawing Index
Logs
                                                'eceipt Office Admin.
'eceipt Master Drawing Index Office Admin.
Stamps             Original
Stamps Original
                              'As-Built'ffice Admin.
'As-Built'ffice Admin.
Prepares Transmittal Office Admin.                           Reproduc ion Obtains Prints Office Admin.
Prepares Transmittal Office Admin.
Obtains Lead Engineer Approval Office Admin.                 ~   Site I Repro.
Obtains Prints Reproduc ion Office Admin.
Distributes                  ~   Others as directed Drawings                  ~   File - original NEL-OI4.G Pagee 11 of I16                                                R v 'sian 0 3177A                                                          Augus-     19B5
Obtains Lead Engineer Approval Office Admin.
Distributes Drawings
~
Site I Repro.
~
Others as directed
~
File - original Page 11 of 16 e
I 3177A NEL-OI4.G R v 'sian 0
Augus-19B5


AT ACHNEW'EL 014m Q-1 VENDOR DOCUMENT COHZROL PLOWCNART Page   5 of 6 Tech Manuals Received by           (2 copies)
AT ACHNEW'EL 014m Q-1 VENDOR DOCUMENT COHZROL PLOWCNART Page 5 of 6
Respons ible Eng.
Tech Manuals Received by Respons ible Eng.
(2 copies)
Responsible Eng.
Responsible Eng.
Reviews Tech Manual Responsible Eng.
Reviews Tech Manual Responsible Eng.
Resolves Problems with Vendor
Resolves Problems with Vendor Responsible Eng.
                                                        ~   Applicability Responsible Eng.          ~   Cautions Prepares Transmittal        ~   'Not to   be   revised without   NE revie~'esponsible Eng.
Prepares Transmittal
~
Applicability
~
Cautions
~
'Not to be revised without NE revie~'esponsible Eng.
Transmits Both Copies to Office Admin.
Transmits Both Copies to Office Admin.
Office Admin.                 Master Drawing Index Logs Receipt Office Admin.
Office Admin.
Distributes Site Records   Mgmt                 Nuclear Engineering Library (l copy)                                   (1 copy)
Logs Receipt Master Drawing Index Office Admin.
NEL 014  '
Distributes Site Records Mgmt (l copy)
Pag e 12 of 16 1                                                     Revision             0 0177A                                                            August                       .'985
Nuclear Engineering Library (1 copy)
Pag 12 of 16 e
1 1
0177A NEL 014 '
Revision 0
August
.'985


ATTACHMENT NEL-014m G-1 VENDOR DOCJMENT CONTROL LOWCHART Page   6 of 6 Doc. Package Received by Responsible Eng.
ATTACHMENT NEL-014m G-1 VENDOR DOCJMENT CONTROL LOWCHART Page 6 of 6
and   Site Site                   Site or         Engineering Engineering Package?
Doc.
Site QA Performs                                     Responsible Eng.
Package Received by Responsible Eng.
Receipt                                          Transmits Copy Inspection                                      of Package   to Pile Site QA                                       Responsible Eng.
and Site Site Site or Engineering Package?
Resolves Comments                                        Assists Site with Vendor                                    Personnel as Requested HEL-014. 0 Page  13 of 16                                                    Revis'on   0 0177A                                                              August       1985
Engineering Site QA Performs Receipt Inspection Responsible Eng.
Transmits Copy of Package to Pile Site QA Resolves Comments with Vendor Responsible Eng.
Assists Site Personnel as Requested Page 13 of 16 0177A HEL-014. 0 Revis'on 0
August 1985


hT ACCENT'EL-014+Q-2 VENMR DOCUNENT RECK&i T STAMPS NIAGARA MOHANK POVFER CORP.
hT ACCENT'EL-014+Q-2 VENMR DOCUNENT RECK&i T STAMPS NIAGARA MOHANK POVFER CORP.
REC.
REC. IVED LETTER PO'2 PROSPECT EQ'JIP.
PROSPECT IVED                         LETTER PO'2 EQ'JIP. PIECE llQ.
PIECE llQ.
P.O. 0                 VENDOP     0 IfiOD,                  M;O.
P.O. 0
4'ag NEL-014.0 14 oZ 16                                          Revis1on 0 0177h                                                  Augus-     1985
: IfiOD, VENDOP 0 M;O.
4'ag 14 oZ 16 0177h NEL-014.0 Revis1on 0
Augus-1985


ATTACHMENT NE -Q14.G-3 PRINT REQUEST FORM NlNT ra~ IS INMR
ATTACHMENT NE -Q14.G-3 PRINT REQUEST FORM NlNT NMR ra~ IS I ~ I Orle I Jl ~ la, 00Ictl 0ato II~ of Print I~
                        ~I                         0ato I~
Sane frlnta to!
Or le I Jl ~ la,         II~ of 00Ictl                Print Sane   frlnta to!
Dao a Wslht IatMrn Or I llna 1 ~
Dao a Wslht IatMrn Or I ll na 1 ~
to'OIa rtnont Fra Jact t peqe 15 of 16 0177A uEL-014. G Revision 3
to'OIa rtnont Fra Jact t uEL-014. G Revision   3 peqe 15 of 16                                              August 1985 0177A
August 1985


ATTACHME&#xc3;Z NEL-014 ~ 6 4 VENDOR DOCUMENT REVIEW STAMP NUCLEAR BlGINcERING DEPT, NIAGA"A MOHAN POSER CORPORATION SYRACUSE N. Y DISPOSITION OF SUBMITTAL
ATTACHME&#xc3;Z NEL-014 ~ 6 4 VENDOR DOCUMENT REVIEW STAMP NUCLEAR BlGINcERING DEPT, NIAGA"A MOHAN POSER CORPORATION SYRACUSE N. Y DISPOSITION OF SUBMITTAL
              ~ 0:"C" PT":D Q ACCwFfc'.0 WITH CHANGES NOTED Q
~ 0:"C"PT":D Q ACCwFfc'.0 WITH CHANGES NOTED Q NOT ACCEPTc&
NOT ACCEPTc&
Q REVISE AND RESUBMIT 8Y, JIATK page 16 of 16 0177A NKL-014. G R vision 0
Q REVISE AND RESUBMIT 8Y                   JIATK NKL-014. G page 16 of 16                                  R vision   0 0177A                                          August,     19SS
: August, 19SS


A}}
A}}

Latest revision as of 13:13, 9 January 2025

Rev 0 to Nuclear Engineering & Licensing Procedure NEL-014.G, Control & Distribution of Vendor Documents
ML17055B534
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 08/22/1985
From: Gresock G, Miles K, Wilczek S
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17055B512 List:
References
NEL-014.G, NEL-14.G, NUDOCS 8604280282
Download: ML17055B534 (32)


Text

Enclosure E20 NIAGARA MOHAWK POWER CORPORATION NUCLEAR ENGINEERING ANO LICEilSING PROCEOURE TITLE:

CONTROL ANO OISTRI8UT'ION OF VENOOR OOCUMENTS r

Procedure No:

NEL-O14.G Revision:

Subject to periodic review by EAPRC Expiration Oat'e:

Au9ust I987 Name Title Oate Prepared by:

General Ph sics Corp.

N/A 8/5/85 Reviewed by:

1 es Office Administr ator Approved by:

resoc M r. - Nuclear Oesi n

1 cze r.

4r-C. 0.

er

. L. Nass M r. - Nuclear Technolo y M r. - Nuclear En ineerin M r. - Staff Services gz/Z'5' A/o-0 EAPRC Acceptance:

. J.

Gresock EAPRC Chairperson 5//3/~

Paae 1 of 16

'3177A 8604280282 8604i5'PDR ADDCR 00000410 PDR August lo85

F f

1.0 pURPOSE To describe methods for the control and distribution of vendor documents by Nuclear Engineering and Licensing personnel, 2.0 SCCPE/REFERENCES/SOURCE DOCUMENTS 2.1 Scooe This procedure applies to formal project-related vendor documents received by Nuclear Engineering and Licensing.

2.2 References The following documents may need to be referenced when using this

.procedure:

NEL<14 Document Control and Distribution NEL-015 Procurement of Materials/Services NEL-015.C Purchase Requisition Completion OA-014.A Technical Library OA-014.C Master Drawing Index FR-014.C Control and Distribution of Drawings 2.3 Source Documents The following documents were used in preparing this procedure:

10CFR50, Appendix 8, Criteria III and YI ANSI/ANS 3.2-1982, Section 5.2.7 ANSI/ASME NQA-l-1983 and Addenda, Sections II-3 and II-6 and Supplements 3S-I and 65-1 NUREG-1000 Generic Implications of ATWS Events at the Salem Nuclear Power Plant 3.0 DEFINITIONS 3.1 Controlled Document - A document that specifies quality requirements or prescrs es actlv>t>es affecting quality that require special hanaling to ensure that correct documents are being employed.

The document is traceable to holders at all times and is uniquely identified as controlled.

Holders are kept informed of the latest available information through controlled distribution of subsequent issues and changes (i.e.,

revisions and addenda).

Examples of controlled documents include approved instructions, procedures, drawings, specifications, procurement documents, calculations, system descriptions, vendor documents, and the indexes for these documents.

Page 2 of 16 0177A NEL-014.G Revision 0

August 1985

3.2 3.3 Uncontrolled Oocument - A document that may be distributed without traceabi ity to no ders.

Holders of uncontrolled documents will not autOmatiCally reCeiVe SubSequent iSSueS Or ChangeS.

Vendor Oocument - Vendor-supplied information relevant to the operation are defined as drawings, technical

manuals, and documentation packages.

3.4 Technical Manuals - A standard manual issued by vendors that describes maintenance.

Tech Manuals should include recommended spare parts.

3.5 Vendor Or awin

- A graphical representation issued by vendors that provi es in erface design information to engineering personnel such as dimensions, electrical interconnect requirements, mounting requirements, etc.

3.6 3.7 Vendor Oocumentation Packa e

(Ooc. Package)

- A collection of data su mi e

y e ven or wi shipment of the component that is used by site personnel to perform receipt inspection.

En ineerin Orawin Control Clerk - As used in this procedut e, refers o

e c er s

assigne to arawing control.

4.0 RESPONSI BILITIES 4,1 4.2 The responsible engineer ensures that vendor documents receive proper reviews by project team members and other NMPC departments involvea with the project before distribution and use.

Under the direction of the Office Administr ator and guidance of responsible engineers and Lead Oiscipline Engineers, the engineering drawing control clerk orocesses vendor documents in accordance with the instructions of this orocedure.

5.0

?REREDUISITES vendor documents are specified as part of the procurement process.

Resoonsible enqineers performing procurement must specify timely suomit-al of vendor documents ensuring appropriate cooies.

The following is recommended:

a.

Vendor Orawings -

1 reproducible for comment before.abrication b.

Tech Manual - 2 copies befor e shipment c.

Ooc.

Package 2 copies upon shipment (one cooy to Syracuse, one copy with the shipment) 6.0 PROCEOURE 6.1 SpeCif in Vendpr OOCumentS 6.1.1 The responsible en)i'beer shall speci y vendor document requirements during the procurement process (refer to Procedures NEL-015 and NEL-015.C)

~

Page 3 of 16 0177A NEL-014.G Revision 0

August 1985

6.1.2 The responsible engineer shall state which documents are to oe submitted for review (before fabrication) and whicn documents are to be submitted for information only.

6.1.3 The responsible engineer shall specify copy requir ements (refer to Section 5.0 for guidance).

6.2 Vendor Oocument Review C cle - Refer to Attachment NEL-014.G-1 for a owchar o

is process 6.2.1 Vendor documents submitted for review are received by the responsible engineer.

6.2.2 The responsible engineer:

a.

Reviews the submittal for completeness b.

Oetermines internal review requirements 6<<2.3 c.

Transmits the submittal to the Office Administrator/engineering clerk for distribution The Office Administrator/engineering clerk:

a.

I.ogs in receipt of documents in Master Orawing Index per Procedure OA-014.C b.

Stamps original as received (Refer to Attachment, NEL-014.G-2) c.

Obtains review prints From Files and Reproduction using Attachment NEL-014.G-3 6.2.4 6<<2 <<5 d.

prepares review transmittal Assembles review packages f.

Oistributes review packages for internal review '.ndicat'.ng required completion date Engineers and designers, receiving the transmittal, review vendor documents and submit comments to the Office Admini-strator/engineering clerk by the required date.

If rhere are no conments the engineer/designer shall so indicate.

~jpon receipt of comments, the Office hdministrator/engineering clerk:

Assembles comments

?age 4 of 16 0177A NE'-014. G Revision 0

August 1985

b.

Contacts individuals not having submitted coments, if necessary c.

Transmits coaments to the responsible engineer with the vendor's original reproducible 6.2.6 The responsible engineer:

a.

Reviews and resolves co+vents 6.2.7 b.

Consolidates contents on vendor's reproducible using drafting assistance as required c.

Stamps reproducible as applicable (Refer to Attachment NEL-014.6-4) d.

Prepares transmittal letter to vendor e.

Transmits letter and original to the Office Administrator/engineering clerk for distribution The Office Administrator/engineering clerk:

a.

Logs the transmittal in the Haster Orawing Index per Procedure OA-014.C b.

Obtains prints for distribution from Files and Reproduction Rote:

For those documents that are indicated as "Accepted" the transmittal to the vendor need not include copies of the document.

For those documents indicated as "Accepted arith Changes Noted" or "Not Acceoted" a print of the document shall be included.

6.2.8 c.

Transmits package to vendor d.

Oistribute copies of tr ansmittal internally per transmittal instructions provided by the responsible engineer The vendo~,

upon receiving the vendor document review transmittal:

a.

Proceeds with fabrication and incorporates any comments or Page 5 of 16 0177A uEL-014.G Revision 0

August 1985

b.

Ooes not proceed with fabrication and resubmits revised documents in accordance with the instructions within the transmittal.

Resubmittals are treated as new drawings starting with Step 6.2.1.

If the vendor has been instructed to proceed with fabrication, the next document transmittal will be the as-built transmittal.

6.3 As-Built Vendor Oocuments 6.3.1

~0rawin s

a.

The responsible engineer receives final as-built vendor drawings before shipment.

b.

The responsible engineer reviews the drawings and transmits to the Office Administr ator/engineer ing c 1 erk for distribution.

C ~

The Office Administrator/engineering clerk:

1.

Logs in receipt of final as-built drawings in the Master Orawing Index 2.

Stamps the drawings as "As-Built" 3.

Obtains copies for distribution 4.

Prepares transmittal 5.

Obtains Lead Engineer approval of transmittal 5.

Oistributes transmittal to:

d.

o Site Records

'management 1 reoroducible o

Project Personnel

- as instructed o

Project File - original The responsible engineer shall ensur e that previous r evisions of dr awings entered into the Master Orawing Index are stamped as "superceded" upon receipt of a new revision.

Ahen a vendor drawing is assigned an AMP'rawing number the vendor drawing shall also be stamoed "superceded".

5.3.2 Tech Manuals a.

The responsible engineer receives,. at a ~inimum, two (2) copies of the Tech Manual(s) before shioment.

Paqe 6 of 16 0177A NEL-014.G Revision O

August 1985

b; The responsible engineer:

1.

Reviews the manual 2.

Resolves any comments with the vendor 3.

Prepares transmittal including any special instructions in the use of the manual such as applicablity, cautions, etc.

Note:

The transmittal shall state that the manual is not to be' evised without prior review of revisions by Nuclear Engineering.

4.

Transmits two copies of the manual and the transmittal to the Office Administrator.

c.

The Office Administrator/engineering clerk:

1.

Logs in, receipt of the manual(s) in the Master Orawing Index 2,

Stamps the manuals "Controlled" in red ink 3.

Oistributes the manual:

o One copy to Site Records Management o

One copy to the Nuclear Engineering Libr ry Note:

Revisions to Tech Manuals shal 1 be handl ed in the same fashion as original submit als.

6.3.3 Oocumentation Packa e

a.

Both the Site and the responsible engineer receive a :ooy of the Oocumentation Package upon shipment or the i-.em.

b.

The responsible engineer:

1.

Reviews the package for completeness 2.

Assists Site personnel as requested in receiot inspection 3.

Transmits the package to the Office Administrator to file in the Project File 7.0 ATTACHMENTS NEL-014.G-I NEL-014.G-2 NEL-014.G-3 NEL-014.G-4 Vendor Oocument Control Plowchart Vendor Oocument Receipt Stamp Print Request Form Vendor Oocument Review Stamp Page 7 of 16 0177A NEL-014.G Revision 0

August 1985

ATTACHMENT HEL 014 ~ C-1 VENDOR DOCUNERZ COHZROL PLOWCHART Page 1 of 6

Vendor Documents Received by Responsible Eng.

Document Package Transmitted to Office Admin.

Office Admin.

Logs in Receipt and Stamps Original Master Drawing Index Office Admin.

Prepares Internal Review Transmittal Office Admin.

Obtains Prints for Reviev Reproduc

'on Office Admin.

Assembles Review Package Office Admin.

Receives Comments Office Admin.

Assembles Comments

?age 8 of 16 0177A

.tEL-014. 0 Revision 0

August

'985

ATTACHMENT NEL 014m G-1 VENDOR DOCUMENT CONTROL FLOWCHART Page 2 of 6

Office Admin.

Transmits Cement Package to Responsible Eng.

Responsible Eng.

Resolves Comments Responsible Eng.

Consolidates Comments Drafting Reproducible is Stamped and Signed by Responsible Eng.

Responsible Eng.

Prepares Transmittal Letter to Vendor Office Admin.

Logs in Receipt Master Draving Index Office Admin.

Obtains Prints Reproduction Office Admin.

Transmits Comments to Vendor Page 9 of 16 9177A Office Admin.

Makes Internal Distribution NEL<<014. Q Revision 0

August

'985

~

ATTACHMENT NEL-014m G 1 VENDOR OOCVMENT CONTROL FLOWCHART Page 3 of 6

Not Accepted Cananents Accepted wl'Comments Vendor Does Hot Proceed with Pabrication Accepted Vendor Resubaits Document Per Date Established Vendor Proceeds with Fabrication Vendor Proceeds with Pabrication Resubmitted is treated as new Submittal Vendor Resubmits if Requested in Transmittal Vendor Comple tes Pabr ication Vendor Completes Fabrication Vendor Submits As-Built Documents Pinal Drawings Tech Manual Doc.

Package (see Page 4)

(see Page 5)

(see Page 6)

Page 10 of 16 0177A VEL-014. 0 Revision 0

Augus-1985

ATACHMER'EL 014e Q-I VENDCR DOCUMENT CONTROL PLQMCHART Page 4 of 6

Final Drawings Received and Reviewed by Responsible Eng.

(1 reproducible)

Responsible Eng.

Transmits to Office Admin.

Office Admin.

Logs

'eceipt Master Drawing Index Office Admin.

Stamps Original

'As-Built'ffice Admin.

Prepares Transmittal Office Admin.

Obtains Prints Reproduc ion Office Admin.

Obtains Lead Engineer Approval Office Admin.

Distributes Drawings

~

Site I Repro.

~

Others as directed

~

File - original Page 11 of 16 e

I 3177A NEL-OI4.G R v 'sian 0

Augus-19B5

AT ACHNEW'EL 014m Q-1 VENDOR DOCUMENT COHZROL PLOWCNART Page 5 of 6

Tech Manuals Received by Respons ible Eng.

(2 copies)

Responsible Eng.

Reviews Tech Manual Responsible Eng.

Resolves Problems with Vendor Responsible Eng.

Prepares Transmittal

~

Applicability

~

Cautions

~

'Not to be revised without NE revie~'esponsible Eng.

Transmits Both Copies to Office Admin.

Office Admin.

Logs Receipt Master Drawing Index Office Admin.

Distributes Site Records Mgmt (l copy)

Nuclear Engineering Library (1 copy)

Pag 12 of 16 e

1 1

0177A NEL 014 '

Revision 0

August

.'985

ATTACHMENT NEL-014m G-1 VENDOR DOCJMENT CONTROL LOWCHART Page 6 of 6

Doc.

Package Received by Responsible Eng.

and Site Site Site or Engineering Package?

Engineering Site QA Performs Receipt Inspection Responsible Eng.

Transmits Copy of Package to Pile Site QA Resolves Comments with Vendor Responsible Eng.

Assists Site Personnel as Requested Page 13 of 16 0177A HEL-014. 0 Revis'on 0

August 1985

hT ACCENT'EL-014+Q-2 VENMR DOCUNENT RECK&i T STAMPS NIAGARA MOHANK POVFER CORP.

REC. IVED LETTER PO'2 PROSPECT EQ'JIP.

PIECE llQ.

P.O. 0

IfiOD, VENDOP 0 M;O.

4'ag 14 oZ 16 0177h NEL-014.0 Revis1on 0

Augus-1985

ATTACHMENT NE -Q14.G-3 PRINT REQUEST FORM NlNT NMR ra~ IS I ~ I Orle I Jl ~ la, 00Ictl 0ato II~ of Print I~

Sane frlnta to!

Dao a Wslht IatMrn Or I llna 1 ~

to'OIa rtnont Fra Jact t peqe 15 of 16 0177A uEL-014. G Revision 3

August 1985

ATTACHMEÃZ NEL-014 ~ 6 4 VENDOR DOCUMENT REVIEW STAMP NUCLEAR BlGINcERING DEPT, NIAGA"A MOHAN POSER CORPORATION SYRACUSE N. Y DISPOSITION OF SUBMITTAL

~ 0:"C"PT":D Q ACCwFfc'.0 WITH CHANGES NOTED Q NOT ACCEPTc&

Q REVISE AND RESUBMIT 8Y, JIATK page 16 of 16 0177A NKL-014. G R vision 0

August, 19SS

A