Encl osure 3.8,....
NINE MILE POINT NUCLEAR STATION ADMINISTRATIVE PROCEDURE PROCEDURE NO. AP-5.0 PROCEDURE FOR REPAIR DATE AND INITIALS APPROVALS SIGNATURES REVISION 2 REVISION 3 REVISION 4 Station Superintende NMPNS Unit 1 T.
W. Roman Station Superintendent NMPNS Unit 2 R. B. Abbott impendent G
eration Gene erkins Quality Assurance Concu re
- Manager, QA Nuclear W. Hansen ce a/i~/m Summar of Pa es Revision 2
(Effective 3/1/86 PAGES 1-40 DATE February 1986 This is a general rewrite NIAGARA MOHAWK POWER CORPORATION THIS PROCEDURE NOT TO BE USED AFTER MARCH 1988 SUBJECT TO PERIODIC REVIEW.
8604280276 860415
(I
SP-S. 0 PROCEDURE FOR REPAIR 1.0 PURPOSE This procedure describes the program for corrective maintenance and repair of structural, mechanical, instrument and electrical equipment at the station (Unit 1 and Unit 2). It includes the procedures for initiation, planning, schedu1ing, documentation, and post-maintenance testing.
Additional requirements for the Unit 2 test program are contained in SAP 117.
2.0 REFERENCES
ANSI N 18.7/ANS 3.2 1982 Section 5.2.7 Maintenance and Modifications ANSI/ASME N45.2.1-1980 - Cleaning of Fluid Systems and Associated Components for Nuclear Power Plants Regulatory Guide 1.33, Quality Assurance Program Requirements AP-4.0 Administration of Operate:ons AP-3.3.1 Control of Equipment, Markups for Personnel Safety AP-3.3.2 Control of Equipment, Placement of Jumpers or Blocks or Lifting of Leads AP-8.2 AND AP-8.3 Surveillance and Test and Inspection Programs AP-6.0 - Procedure for Modification and Addition AP-7.0 - Procedure for Control of Material and Services AP-10.1 Management of Station Records AP-5.1 Site Welding Program MI-6.0 ASME Section XZP Maintenance Work Plan 10CFR50.49 - Environmental Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants.
Generic Letter (GL) 83-28 "Required actions based on Generic Implementation of Salem ATWS Events" July 8, 1983.
ZNPO "Guidance for Conduct of Maintenance at Nuclear Power Stations" October, 1985.
Nine Mile Point Unit 1 Q List Nine Mile Point Unit 2 FSAR Table 3.2-1 Office Instruction OI-21, Work Tracking System 3.0 3.1 SCOPE Corrective Maintenance Mechanical, electrical, and instrument corrective maintenance are performed generally as the resu1t of unsatisfactory equipment performance or equipment failure.
Maintenance or modifications that may affect functioning of safety related structures,
- systems, or components shall be performed in accordance with approved procedures.
Written procedures need not be required for work covering skills normally possessed by qualified maintenance personnel.
Quality Assurance procedures QAP-9.0.1, and associated NDEP's, shall be used as a
guide to the acceptability of special process procedures.
During the Unit 2 test program and prior to receipt of license both the Nuclear Quality Assurance and Construction Quality Assurance Program are in effect providing quality assurance activities and support to Nuclear generation.
AP-5 0
-1 February 1986
3.1 Corrective Maintenance (Cont'd)
The Administrative controls and records required by this procedure shall apply to maintenance work affecting nuclear safety on safety, related systems or components and to all work on major systems and components related to plant reliability.
In general, this procedure shall be used when applicable for organizing and documenting the maintenance on other systems and components.
3.2 Post-Maintenance Testin After completion of corrective maintenance on safety related components, the equipment shall have post-maintenance testing performed to verify that components will fulfill their design function when returned to service.
The tests performed shall be documented in departmental procedures or on a Post-Maintenance Test Report.
The documentation shall include acceptance
- criteria, verification that the test is completed, and a revie~ that the test passed the acceptance criteria.
The tests should be applicable to the degree and type of maintenance performed.
For the purpose of administrative controls the following definitions apply to post-maintenance tests:
(1)
Maintenance Tests:
Tests usually performed by the post-maintenance tests.
These tests are specified in the Maintenance/I6C Procedures and are indicated on line 15 of figure 2.
(2)
Post-Maintenance Tests:
Tests usually performed by the Operations Department after operations acceptance for post-maintenance testing.
These tests as a minimum include Technical Specification requirements and are indicated on line 37 of figure 2.
3.3 Maintenance of E ui ment lified Com onents Where engineering has established corrective maintenance requirements to maintain Equipment Qualification, these requirements shall be implemented into the corrective maintenance performed, as applicable. 'eviations to engineering established corrective maintenance requirements shall be approved by the Nuclear Engineering
& Licensing Department.
3.4 Maintenance of ASME XI Com onents Where corrective maintenance is performed on ASME XI components, a
maintenance evaluation report (Figure 4) and Maintenance Work Plan (MI-6.0), if applicable, shall be complete per MI-6.0.
Notifications of ISI, who would notify ANII, shall be included in the applicable maintenance procedures or addressed by MI-6.0.
-2 February 1986
3.5 Maintenance of Securit Com onents The Security Department performs maintenance or security instrumentation using personnel and an administrative system internal to the Security Department.
- However, any maintenance work performed for Security by other Site depaztments or work performed within the plant facilities by the Security Department shall be managed in accordance with this procedure.
3.6 Cleanness Control of Fluid S stems Durin Corrective Maintenance Cleanness control of fluid systems shall be maintained per ANSI/ASME N45.2.1.
Departmental procedures shall establish cleanness control and provide for verification of cleanness prior to closure of a fluid system.
This verification shall be provided for safety related fluid systems and non-safety related fluid systems whose fluid interfaces with a
safety related system.
The cleanness level shall be established by supervisors, assistant supervisors, or engineers in the department assigned to do work.
3.7 Work Trackin S stem (WTS)
The WR is entered in the Work Tracking System as WR is processed in accordance with OI-21.
In addition, labor accounting is performed using the Labor Accounting System (LAS).
4.0 REPORT OF SYSTEM OR COMPONENT MALFUNCTION OR DEFICIENCY When anyone in the plant notices a system or component malfunction or deficiency which may affect station reliability, safety, or output, he shall immediately inform his immediate supervisor and the Station Shift Supervisor.
The Station Shift Supervisor shall take action in accordance with AP-4.0.
Work Requests noting a system or component malfunction or deficiency, or requesting corrective
- action, may be originated by the person discovering the trouble, by his immediate chief or supervisor, or by the S.S.S.
Approval and receipt of the WR shall be obtained from one of the following or a higher level supervisor relative to the work to be corrected.
During off hours, the senior representative of the department to do work may receive a
WR.
a.
Operations Assistant Supervisor, SSS or ASSS b.
Maintenance Superintendents, Engineers, Supervisors or Assistant Supervisors.
c.
Instrument and Control Supezvisoz or Assistants.
d.
Chemistry and Radiation Protection Supervisor, Unit Supervisors, or Instrument Support Supervisor AP-5.0
-3 February 1986
e
4.0 (Cont'd) e.
Reactor Analyst Supervisors f.
Technical Support Supervisor or Assistants g.
Senior Security Investigator, Security Investigator, Shift
- Sergeant, or Security Eng'ineer.
h.
Computer Operations and Maintenance Supervisor or Assistants.
i, Supervisor Fire Protection or Assistant Supervisor Fire Protection.
Superintendent ISI or Unit ISI Supervisors.
k.
Test Group Managers,
- Leads, or Supervisors (During Unit 2 Test Program Only).
5.0 WORK RE VEST FORM (WR)
The Work Request Form is used for ordering, scheduling, dispatching, and recording the results of corrective maintenance work and associated post-maintenance tests at the station.
Prenumbered blank forms are retained by Station Supervisors for originating work assignments.
(See Figure 2 and 3)
A computerized system known as the Work Tracking System (WTS) parallels the Work Request and may later take the place of the WR when sufficient experience is accuiulated.
Blocks are provided on selected lines of WR form for clerks to initial when the data is entered into the WTS system.
This later sytem will expedite the scheduling of maintenance and the accumulation, of a
rapidly searchable equipment maintenance history data base.
5.1 Duties of Ori inator 5.1.2.1 Enter Issue Date (line 1).
Determine the lead (L) Department to Do Work (line 3).
5.1.2.2 Select the priority of work in accordance with the following guidelines (line 4) 5.1.2.2.1 NonWutage Work:
Priority 1 Emergency, limits station operation.
Top priority work for the day.
Provide special coverage, if necessary.
Priority 2 Urgent, hinders station operation.
Schedule within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
-4 February 1986
5.1.2.2.1 (Cont'd)
Priority 3 Necessary, has potential to degrade or hinder station operation.
Schedule within seven days.
Priority 4 - As time permits.
5.1.2.2.2 Outage work:
Priority 5 - Next unit outage Priority 6 Next refueling outage 5.1.2.3 Indicate the Unit (line 5),
the System Code (line 6),
Component Number (line 7) and Equipment Title (line 9).
For system
- codes, see Appendix A for Unit 1 or Appendix B for Unit 2.
Equipment name and number should be that given on the P&I diagram or on an approved list issued by authority of the Station Superintendent.
Valves or instruments may be described by their function with the associated equipment when not otherwise named.
During the Unit 2 test
- program, the BIP number should also be listed (line 8).
5.1.2.4 In the case of equipment failure or malfunction, give a
concise description (line 10).
In addition, describe the equipment location (line 10).
Enter the NPRDS Symptom Code (Appendix C, line 11).
An abridged version of Appendix C is preprinted on the back of the WR forms'.1.2.5 Sign and date the WR (line 12) and deliver to the person authorized to approve the WR for action.
5.2 Duties of the Person A rovin the WR 5.2.1 Check that the correct equipment name and number is entered on the WR form (lines 6,
7, and 9).
Assure lines 3
and 4 are complete and correct.
5.2.2 If the cause of equipment failure or malfunction can be determined at this time, give a concise description in line 29 and 30.
5.2.3 If the post~intenance tests are
- known, these may be indicated on line 37. If the post~intenance tests are not known, initiate post maintenance test report (fig.
5) with the appropriate department supervisor and indicate on line 37.
5.2.4 Sign and date the WR in the space marked "Approved" (line 13) and deliver the WR to a person authorized to receive the WR.
During the Unit 2 test program and prior to operations acceptance of the system; and, if the Test Engineer is not the originator of the WR, concurrence from the Test Engineer shall be obtained prior to work proceeding.
5.2.5 Deliver the green copy to the WR books in the SSS office and send the remaining copies to the department designated to do the work.
-5 February 1986
5.2. 6 Where emergency action is required (Priority 1), the person approving the WR personally delivers the WR to the person responsible for the work and verbally addresses the nature of the emergency.
During non-scheduled working hours, the S.S.S.
or his representative will contact appropriate personnel to deal with the emergency.
5.3 Duties of the Person Receivin the Work Re uest 5.3.1 Sign and date Work Request
- received, line 14.
Zf WR is
- voided, notify approver and notify the S.S.S.
or Security to remove the green copy from the WR brook in the S.S.S.
office.
During the Unit 2 test program and prior to Operations acceptance of the
- system, Test Engineer concurrence should be obtained for voided WR's.
5.3.2 Where a
procedure is required, list the number of the approved procedure or procedures (line IS).
The procedure numbers listed shall include department procedures which perform the applicable maintenance tests.
Certain activities within the normal ability of the individal do not xequire a written procedure to perform.
By checking the "Not required" box in line 15, the supervisor is indicating that the, work can be considered an established routine within the capabilities of a journeyman maintenance person.
5.3.3 Zf the work requires emergency maintenance during non-scheduled working
- hours, immediately contact the on duty or on call QA representative for review.
Mce required entries on line 16 of the Work Request.
NOTE:
Work may not start on safety related equipment until the conclusion of QA review unless immediate action is required to eliminate an unsafe condition as determined by the SSS.
5.3.4 5.3.5 Enter the account number (line 17).
Indicate the Safety Class (line 18) for the component.
Indicate if the component is Equipment Qualified (line 19) or an ASME component (line 20).
An approved list issued by authority of the Station Superintendent should be referenced for this information.
5.3.6 Enter the cleanness class (line q21).
5.3.7 Zndicate any support departments req'uired (line 3).
5.3.8 Zf the work requires a station outage, check that this is marked at the top of the form along with the appropriate priority (line 4, px'iority 5 and 6).
5.3.9-Zf the work requires emergency maintenance (Priority 1), hand deliver yellow, blue, white and pink copies of the WR to Quality Assurance and WTS Clerk.
Otherwise, deliver the WR to QA for review on a
normal schedule.
AP 5 '
W February 1986
5.4 ualit Assurance Review 5.4.1 Upon receipt of the WR from the person responsible for implementing the
- gob, the Quality Assurance representative will examine the scope of the project to determine the inspection and quality requirements.
The QA department shall verify the component's Safety Class (line 18),
Equipment Qualification requirements (line 19),
and ASME III Component requirements (line 20) and the referenced lead department procedures (line 15).
The QA department shall indicate if inspections are required (line 23).
5.4.1.1 5.4. 2 If QC notifications or further QA review are determined to be not applicable to the maintenance to be performed, lines 26 and 35 may be initialed and marked N/A.
Following QA review, the yellow, blue, white, and pink copies of the Work Request are delivered to the WTS Clerk for initial entry into the WTS program.
5.5 Res onsibilit of WTS Coordinator 5.5.1 The request portion (lines 1 through 23) of each work request should be entered into the WTS as soon as practical after generation of the WR.
WTS Clerk retains the pink copy of the M. and returns the yellow and blue copies to the lead department to do work.
The white copy (Figure 3) or copies of the white copy are forwarded to the support departments indicated in line 3.
A copy of the Work Request is forwarded to the ALARA Coordinator who determines whether an ALARA review is required.
A copy of the Work Request is forward to ISI and Planning.
5.5.2 If the work requires emergency or urgent maintenance (Priority 1 and 2), the Planning (Scheduling)
Department should schedule the work for that day.
5.5.3 5.5.4 The Planning Department should receive information required to schedule all work requests not to be immediately implemented.
This information should be obtained after the WR is staged by the lead or support departments (lead department, line 24; support department, line D).
Based on this information and similiar input from other activities, an integrated schedule of deferred work
- requests, surveillance
- tests, inspections, modification operations, and preventive maintenance activities may be produced and published on a
regular basis.
Schedules should be dynamically adjusted to account for scheduled work which was displaced by immediate action requirements.
All outstanding Work Requests items and other activities which do not require a station outage for implementation shall be pro)ected on a schedule which should always be at least one month in advance of the current date.
Schedules should be issued to the department to do work and coordinated where support departments are required.
AP-5. 0
-7 February 1986
5.6 Duties of the Su ervisor Receivin the Work Re uest from WTS Coordinator 5.6.1 Following receipt of the WR from QA or after verbal consultation with the QA supervisor, the work may be assigned for action.
5.6.2 For support departments, the supervisor shall sign that the data sheet (figure
- 3) is received (line A) and complete the procedure number (line B) and applicable account number (line C).
This data is entered in the WTS system.
5.6.3 If the MR is not to be implemented during the week of receipt, the supervisor should assign the WR to be staged (lead department, line 24; support department, line D).
NOTE:
The following data is entered by the departments in the WTS fields and not entered on the WR form.
The data is used by the Planning (Scheduling) department to develop intergrated schedules.
5.6.3.1 If the WR is on hold, the reason should be entered in the MTS system.
5.6.3.2 If the WR is on hold due to parts, purchase requisition numbers should be indicated in the WTS system.
Where parts are reserved, the reservation number may be entered in the WTS system.
5.6.3.3 After staging, enter the manhours and duration estimated to complete the maintenance.
5.6.3.4 Where the maintenance is minor or
- routine, staging may be not applicable.
If the maintenance is of emergency or urgent nature (Priority 1 or 2), staging is not applicable.
5.7 Duties of the Person Assi ed the Work Re uest for Action 5.7.1 Before commencing any maintenance affecting station
- output, safety, or reliability, the Station Shift Supervisor must be informed when the work commences in accordance with the approved maintenance procedure.
When required, Quality Assurance must also be notified (lead department, line 26; support department, line F).
The appropriate entries should be made daily into the WTS and computerized Labor Accounting System (LAS) record to reflect the starting time of each
- gob, the total labor,
- hours, and materials consumed and a narrative of the work completed.
For security hardware (I&C and computer only),
the SSS shall be notified for hardware located only within plant facilities.
In addition, the SSS shall be notified when the work is completed.
Mark line 26 with the time notified or "No", as appropriate.
5.7.2 Upon completing the gob, enter a brief description of the work under Corrective Action (line 27) of the MR and include. appropriate summary remarks in the WTS record.
Enter the NPRDS Corrective Action Code (Appendix C,
line 28).
An abridge version of Appendix C
is preprinted on the back of the WR form.
-8 February 1986
5.7.3 If the cause of equipment failure or malfunction was not determined at step 5.2.2 of this procedure, the person completing the work or his supervisor enters a
description (line 29).
Eater the NPRDS Failure Code (Appendix C, line 30).
5 ~ 7,4 5.7.5 Work Requests for safety related and "Q" class components must be accompanied by copies of or must make reference to material issues and/or completed purchase orders sufficient to pzovide quality traceability for all materials used.
In addition, documentation must be attached to the WR providing traceability to the required certifications for all welding, nondestructive examinations and tests pertaining to the quality of the work.
Check to indicate that materials
- issue, inspection
- zeports, and procedure check lists are attached (lead department, line 31; support department, line H).
Copies of procedures referenced need not be attached.
References should also be incorporated into the WTS record.
Man hour data as called for in the WR form will be available from the
'AS and wiU. be transferred to the WTS as part of the data base management.
A printed transcript should be attached to the WR (lead department, line 31; support department, line H).
5.7.6 Quality Control inspectors shs11 furnish copies of aU.
quality inspection reports for inclusion in the records.
Attach inspection reports to the work request (line 31).
5.7.7 For work pertaining to safety related
- systems, the serial numbers of all mark-upsy RWP's, QCIR's, and NCR No's shall be entered (lead department, line 32; support department, line J).
5.7.8 The completed WR is signed off (lead department, line 33; support department, line K) by the person completing the gob.
This shall indicate that aL1 work, including QC inspections and maintenance
- tests, called for in the maintenance procedure has been completed and that the maintenance tests are completed and. passed the acceptance criteria.
Documentation must show that inspections and tests required to satisfy Appendix B to 10 CFR 50 have been completed by persons independent of those comple'ting the work.
5.8 Duties of Persons Verif in Work and Acce tance for 0 eration 5.8.1 The signature of the supervisor responsible for the maintenance shall be entered as soon as practical after completion of the job indicating his verification and acceptance (lead department, line 34; support department, line K).
This is to verify that all work including the items in 5.7.4 have been completed.
The Department clerk shaU.
enter this signoff into the WTS system after supervisor h&s signed and dated and sends to QA for verification.
5.8.1.1 If line 35 has been checked "NA" by a QA department representative, the yeU.ow and blue copies of the WR is delivered by the person signing off in line 34, or his representative, to the Station Shift Supervisor.
The lead department, in this case, sha11 attach support department copies (white copy) of the WR.
-9 February 1986
If the component is a
ASME Section XI component, the WR is forwarded to the ISI department.
The ISI department will complete NIS-2 and ASME Section XI Abstract Forms per the applicable ISI departmental procedure.
After completion of the
If the component is security hardware located outside the plant facilities (l&C and computer only),
the WR is forwarded to the Security Shift Supervisor.
The Security Shift Supervisor sha11 signify acceptances by completing lines 36 and 39 of the WR and checking the "Supv" block.
Lines 37 and 38 are not applicable.
The WR shall not be forwarded to the QA department and Operations department for final acceptance.
The blue copy of the WR is retained by the Security department, or a
representative.
The completed yeU.ow copy of. the WR is forwarded to the WTS clerk for closeout per 5.8.6.
The Quality Assurance department shall enter the final verification signature in line 35.
This signature indicates that Quality Assurance Operations certifies that maintenance and associated maintenance tests has met the Quality Assurance requirements and the equipment is acceptable for operation pending any postmaintenance tests indicated on line 37.
The Quality Assurance department shall verify that documentation is received from both the lead departments (yellow copy) and support departments (white copies) indicated on line 3.
The QA. department shall attach support department copies (white) to the WR.
The QA clerk enters the QA login date on WTS and, after verification by QA, enters name and date of the QA representative doing verification prior to delivering the yellow and blue copies of the WR to S.S.S.
The SSS/ASSS shall review, verify, and correct, as necessary, what post-maintenance test shall be performed for safety related equipment by the Operations Department prior to making the equipment "operable" as defined in Technical Specifications.
The ASSS/SSS shall indicate the tests on line 37 and sign line 36.
Where a specific test is not written to complete the applicable post~intenance
- testing, a
PostWaintenance Test Report (Figure 5) shall be prepared and attached.
During the Unit 2 test program and prior to Operations acceptance of the
- system, any subsequent retest required will be performed by the test engineer; and
- thus, lines 37 and 38 are not applicable.
The Operations department clerk should enter the applicable tests in the Work Tracking System.
When the post maintenance tests on line 37 are completed, the person verifying completion shall sign line 38 and forward the WR to the SSS.
For all work other than that noted in 5.8.1.3, the signature of the Station Shift Supervisor is required on line 39 prior to making the equipment "operable" as defined in Technical Specifications.
This signature ingicates that the SSS is satisfied that the equipment is ready for service.
In no case shall safety related equipment be made "operable" prior to acceptance by the Station Shift Supervisor.
-10 February 1986
5.8.5.1 The blue copies of completed work requests originating in the Station Shift Supervisor's Office may be retained by the SSS at this time.
Blue copies of other work requests should be returned to the person originating the work request.
The green copy of the WR should be removed from the WR Book in the SSS office.
During the Unit 2 test program and prior to Operations acceptance of the
- system, the blue and green copies are forwarded to the Test Engineer.
After S.S.S.
approval on line 39, department clerk enters S.S.S.
Logout date on WTS prior to delivering the WR to WTS clerk.
5.8.5.2 If protective mark ups are cleared/surrendered by the maintenance organization and the equipment does not qualify for operation according to Technical Specifications, the SSS is responsible that a
mark up or yellow hold out tag is retained on the equipment until final acceptance for operation is documented.
(See AP-3.3.1) 5.8.5.3 If the Station Shift Supervisor does not find the equipment satisfactory upon turn over by Quality Assurance and/or Maintenance, he shall mark "No" on line 39 of the work request and originate a new work request.
Mark the new work request number on the closed out form as:
"See W.R. No. 8384".
5.8.6 Following all sign~ffs, the completed yelLow copy and attachments of the work request are returned to WTS clerk for close-out and to verify the WTS equipment history record is a true summery and/or key to the WR information delivered.to the Equipment History File.
5.8.7 Following WR close-out, the WTS clerk the delivers completed WR to Rx.
Physics Department, where the NPRD section is completed (line 40).
For Unit 2, NPRD's tracking is not required until fuel load.
The WR is then returned to the WTS clerk.
Completed WR's along with all attachments are then delivered to Document Control for filming (line 41).
After filming, the documents are returned to the central files.
6.0 POST MAINTENANCE TEST REGISTER The TechnicaL Support Department will maintain a
register of recommended maintenance tests and post~intenance tests.
The register will be administered in accordance with a Technical Support departmental procedure.
The register will generically list the type of component, type of maintenance performed, and type of test required.
The register will be used to 'insure appropriate tests are performed and for development of departmental procedures and interfaces between departments.
7.0 CORRECTIVE MAINT1MQlCE REVIEW The Maintenance Review Program consists of regularly scheduled annual reviews of all Corrective Maintenance actions involving safety related structures, systems and components and those whose loss limits or prevents power production.
AP-5 0
-11 February 1986
7.1 Annual Reviews Electrical and Mechanical Maintenance Superintendents, Instrument and Control Supervisor, Chemistry and Radiation Protection Supervisor, and the Reactor Analyst Supervisor shall annually review the log of aU.
Work Requests issued to their departments involving safety-related structures,
- systems, or components and those whose loss limits or prevents power production.
The review may consist of, but not be limited to, the following:
ao b,
Co A review of the Work Request Log, paying particular attention to the number of Work Requests issued for each item and each group of similar items.
For those items
- which, based upon the frequency and type of operation and age of the
- item, exhibit a
high incidence of failure.
A review of the completed Work Requests or equipment histories wi11 be made in an effort to determine the cause of the failures.
A written, signed statement shall be prepared stating that the annual review has been conducted and summarizing significant findings and recommendations.
(See Figure 1 attached).
The originaL of this statement shall be sent to the Station Superintendent for review and action.
After Station Superintendent
- review, the Corrective Maintenance Review Statement shall be sent to the Technical Superintendent and an analysis performed per 8.0.
7.2 Perodic Re orts The ISI Superintendent, or designee, shall provide periodic reports of corrective maintenance on ASME XI components to the Station Superintendent.
These reports shall summerize corrective maintenance and 'associated failures.
One report shall be completed after a
refueling outage or an extended outage.
8.0 PERFORMANCE ANALYSIS The Technical Superintendent will review the department Corrective Maintenance Review Reports in con)unction with the results of the Test and Inspection Program.
He will make recommendations for improvements in the T
& I Program and/or equipment based upon equipment failure
- rates, trends in equipment performance, and analysis of the causes of equipment malfunction and failure.
These recommendations shall be presented to the Operations Assessment Committee for review and assignment.
-12 February 1986
9.0 ATTACHMENTS 9.1 Figure 1 Corrective Maintenance Review Statements 9.2 9.3 9.4 9.5 9.6 9.7 9.8 Figure 2 Work Request Figure 3 - Work Request - Support Department Figure 4 Maintenance Eva1uation Report Figure 5 Post Maintenance Test Report Appendix A System Codes, Unit 1 Appendix B << System Codes, Unit 2 Appendix C NPRDS Codes AP-5. 0
-13 February 1986
FIGURE I CORRECTIVE MAINTENANCE REVIEW STATEMENT I hereby certify that I have performed the required review of corrective maintenance assigned to my department and I have the following comments:
Signatur e/Date Department Station Superintendent Date Technical Superintendent/Date OEA Committee Chairmen Date AP-5.0
-14 February 1986
I
'r MlAGAMANi~E M~LE U MOHAWK po INT FIGURE 2
- 1. DATE
- 3. DEPARTMENT TO DO WORK QE Qs ELECTRICALMAINTENANCE Pi Ps MECHANICALMAINTENANCE Q<
Qs INSTRUMENTATIONE, CONTROL Qi Qs COMPUTER Qi Qs ISI Qi Qs SECURITY I EI C Qi Qs FIRE Qi Qs METER ET TEST Qi Qs OTHER
- 4. PRIORITY OF WORK Ql EMERGENCY QI URGENT (<1 DAY)
QI NECESSARY ((7 DAYS)
Ql AS TIME PERMITS (>7 DAYS)
QI NEXT UNIT OUTAGE Qs NEXT REFUELINGOUTAGE'.
UNIT: 0 1 0 2 0 SITE
- 6. SYSTEM CODE
- 7. COMPONENT NUMBER
- 8. BIP NUMBER
- 18. SAFETY CLASS OSR O 0 O NSR 19.
EQ O YES O NO
- 20. ASME COMPONENT O YES O NO
- 21. CLEANNESS CLASS
- 9. EQUIPMENT TITLE:
- 10. FAILURE DESCRIPTION AND LOCATION I 11. NPRDS. SYMPTOM CODE C3 DESCRIPTION
- 12. ORIGINATOR
- 13. APPROVED
- 14. W.R. RECEIVED
- 15. PROCEDURE NOS. /
- 17. ACCOUNT "I:
JlRJ'ATE
/
DATE
/
DATE
/
/
hIOT
/
0 REQUIRED DATE
/
/
TIME QA NAME I ' 1'h II1':
I I
Nlk I
I I
KNI
~
':N P/A
~
/
/
- 23. INSPECTION REQUIRED 0 YES 0 NO DATE
/
/
OPARTS OPROCEDURE ODRWG OMARKUPORWP ONA~
DATE
/
/
. STAGED BY
/
/"
TIME
- 25. 'ASSIGNED TO
- 26. NOTIFICATIONS: QC DATE
/
/
- 27. CORRECTIVE ACTION 28, NPRDS CORRECTIVE ACTION CODE CG DESCRIPTION
- 29. CAUSE OF FAILURE
- 30. NPRDS FAILURECODECZI DESCRIPTION
- 31. ATTACHMENTS 0 MATERIALISSUES 0 PROCEDURE CHECKLISTS 0 INSPECTION REPORTS O LAS O 32, MARKUP ND'3 /
/
RWP ND'3 /
/
QCIR ND'3
- 33. CORRECTIVE ACTION COMPLETED BY
- 34. SUPERVISOR REVIEW BY
- 35. WORK ACCEPTED BY OA PMT REVIEW BY
. PMT PROCEDURE NO'S
- 38. PMT COMPLETE VERIFIED BY 39, ACCEPTED BY 4A NIJAflC Pl hill E MIA+r ~ ~ /
PAPRC DATE
/
DATE
/
/
0 NA DATE
/
/
O ASSS/SSS 0 SUPV, DATE
/
0 PMT TEST REPORT 0 NQT REQUIRED 0 NA DATE
/
/
DATE
/
/
AP-5 '
-l~
FebruarY 9
IMIT I A ~I&
~ ~
I
'7 NIAGARA NINE MILE U MOHAWK POINT
. DEPARTMENT TO OO WORK Qi Qs ElECTRICAlMAINTENANCE Qi Qs MECHANICALMAINTENANCE Qs INSTRUMENTATIONh CONTROL Qs COMPUTER Qi Qs ISI Qi Qs SECURITY I I, C QE Qs FIRE Qi Qs METER II TEST Qi's OTHER
~
I
- 1. OATE
- 4. PRIORITY OF WORK QI EMERGENCY QE URGENT ((1 DAY)
QE NECESSARY(
7 DAYS)
Ql AS TIME PERMITS I>7 DAYS)
C" NEXT UNIT OUTAGE L<l NEXT REFUELING OUTAGE
/
iOOOOO'."
UNIT: Q1 Q2 QSITE
- 6. SYSTEM CODE
- 7. COMPONENT NUMBER B. BIP NUMBER
- 18. SAFETYCLASS QSR QQ QNSR
- 19. EQ QYES QNO
- 20. ASME COMPONENT Q YES Q NO
- 21. CLEANNESS CLASS 9, EQUIPMENT TITLE:
- 10. FAILURE DESCRIPTION AND LOCATION '1. NPROS. SYMPTOM CODE 0 DESCRIPTION
- 12. ORIGINATOR
- 13. APPROVED 14, W.FL RECEIVED
, 15. PROCEDURE NOS. /
- 17. ACCOUNT DATE
/
/
TIME I'I O' S O':
I NIL I
DATE
/
/
DATE
/
/
DATE
/
/
NOT
/
/
0 REOUIRED OA NAME
/
/
- 23. INSPECTION REQUIRED 0 YES 0 NO
~
~ 0'
- 26. NOTIFICATIONS: QC DATE
/
/
A. DATASHEET RECEIVED
B. PROCEDURE
NO'S. /
C. ACCOUNT TIME EINA 0 NI I ' S'lk NOT
/
0 REOVIREO I
I D. STAGED BY E. ASSIGNED TO DATE
/
QPARTS QPROCEDURE QDRWG QMARKUPQ RWP QNA~
DATE
/
/
F. NOTIFICATIONS,'C DATE
/
/
G. SUPPORT DEPARTMENT WORK COMPLETED TIME SSS DATE TIME H. ATTACHMENTS 0 MATERIALISSUES. 0 PROCEDURE CHECKLISTS Q LAS Q J. MARKUP ND'S. /
/
RWP ND'S /
/
K. SUPPORT DEPARTMENT WORK CQMPLETFD BY L SUPERVISOR REVIEW BY DATE DAT
/
/
- 35. WORK ACCEPTED BY QA D NA DATE
/
-16 February 1986
FIGURE 4 MAINTENANCEEVALUATIONREPORT INITIALDETERMINATION Inspection of ASME Section XI component indicates that only minor repairs as specified in Step 311. are required to effect the.
necessary restoration.
GYes 0 No IfNO, answer Questions 1 thru 6.
MAINTENANCEEVALUATION 1.
Was component/item damaged as a result of foreign particle inclusion? {weld slag, debris, etc.)
2.
Is component/)tern damage a result of normal erosion, corrosion, use?
3.
Was component/item damaged during the disassembly activity?
4.
Does damaged component/item require welding, grinding, or machining on a pressure boundary surface? {Except as allowed during normal maintenance by existing procedure or manufacturer's instructions.)
5.
Does inspection (visual, NDE, other) indicate that stress cracks or other design deficiencies exist?
6.
Engineering evaluation is requested to determine cause of failure and/or repair techniques.
(Check YES if YES is checked in Questions 4 and/or 5, or if further evaluation is desired.)
Cl Yes 0 No 0 Yes Cl No 0 Yes CI No CI Yes' No 0 Yes* 0 No OYes 0 No Submitted:
Concurrence:
Maintenance Supervisor Maintenance Engineer Date Date EVALUATIONREPORT DISPOSITION (Required only ifbox for statement 6 is checked YES.).
Transmitted to Engineering:
Name Date V
Returned to Maintenance Supervisor.
Name
-.- Date
FIGURE 5 POST MAINTENANCE TEST REPORT 1.
Tes t Acceptance Criteria Test Complete oSat aUnsat Verified By Date 2.
Test Acceptance Criteria Test Complete oSat oUnsat Verified By Date 3.
Test Acceptance Criteria Test Complete QSat aUnsat Verified By Date 4.
Test Acceptance Criteria Test Complete oSat oUnsat Verified By Date Tests and Acceptance Criteria:
Prepared By Reviewed by ASSS Approved by SSS Date Date Date Test Completion:
Reviewed by ASSS Approved by SSS Date AP-5.0
-18 February 1986
APPENDIX A.
SYSTEM CODES UNIT 1 SYSTEM CODE 01 02 03 04 05 06 06.1 07 08 09 10 11 12 13 14 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 33.1 34 35 36 37 38 39 ZZELE Eatn Steam (Reactor Outlet to Ezternal Zaolatlon Valve Outlet)
'Main Steam (External Isolation Valve Outlet to Turbine Inlet)
Turbine By-Pass Valve System Spar Emergency Condenser Vent to Main Steam Line Steam Supply to Air Effector Steam Supply to Mixing Jet and Off Gas preheaters after pressure reducing vlv H.P.
Steam Supply to Seal Regulator H.P.
Steam Supply to 2nd Reheater 2nd Stage Reheater Drains
& Vents Hot Reheat Steam to L.P.
Turb.
(From Moisture Separator Outlet to L.P. Turbine Spare Cold Reheat Steam to Reheater (From H.P.
Turb.
to Moisture Separator)
Extraction Steam to 1st Reheater Extraction Steam to 5th Feedwater Heater Extraction Steam to 4th Feedwater Heater Extraction Steam to 3rd Feedwater Heater Extraction Steam to 2nd Feedwater Heater Extraction Steam to 1st Feedwater Heater Spare Turbine Steam Seal Regulator (Low Pressure System)
Leakmff From Steam Seal Regulator to 1st Extraction Line Relief Valve Discharge Line to Condenser Gland Seal Exhaust From Turbine to Gland Seal Condenser Misc. Steam Line Drains Moisture Separator Drains
& Vents (to 4th Heater
& Condenser) 1st Stage Reheater Drains
& Vents Feedwater Heater Drains Reactor Head Spray Control Rod Drive Hydraulic Pump to Strainer High Pressure Reactor Feedwater (From Reactor F.
W.
Pumps to 5th Ext. F.
W. Heater Stop Valve High Pressure Reactor Feedwater (5th Heater to Ext. Isol. Valve)
High Pressure Reactor F.W.
From Ext. Isolation Valve to Reactor Inlet (Nuclear Reactor Code Section)
Reactor Recirculating Reactor Cleanup (Reactor to PCV & CU Recirc.
Pumps to Reactor)
Reactor Cleanup (Reactor to 'PCV & CU Recirc.
Pumps to Reactor)
Head Spray Reactor Cleanup (PCV to Pumps)
Reactor Instrumentation (Press, Level, etc. Controls)
Reactor Misc.
Connections (Reactor Vent Drain to Last Isolation Valve-Reactor Water Sample)
Reactor Shutdown Cooling (350'fter Ext. Isolation Valve)
Emergency Condenser Steam Supply
& Condensate Return AP-5.0
-19 February 1986
APPENDIX A (CONT'D)
SYSTEM CODES UNIT 1 SYSTEM CODE 40 41 42 42.1 43 44 44.1 45 45.1 45.2 46 46.1 46.2 46.3 47 48 49 50 51 51.1 52 53 54 55 55.1 56 57 57.1 58 58.1 59 60 60.1
- 60. 2 61 63 63.1 64 65 66 67 68 69 TITLE Reactor Core Spray (Ert. Iaolatloc Valve to Reactor)
Liquid Poison From Tank to Positive Displacement Pumps
& From Relief Valve Discharge to Tank Liquid Poison From Pumps to Outlet External Isolation Valve Liquid Poison From Reactor to External Isolation Valve Resin Transfer Control Rod Drive Hydraulic After Strainer Control Rod Drive Hydraulic Isolaton to Reactor Radioactive Waste Disposal (Corrosive Service)
Radioactive Liquid Waste Disposal Corrosive Service Radioactive Liquid Waste Disposal Corrosive Service Sulphuric Acid Transfer Storage Tank to Mixing Tee Sulphuric Acid Transfer Sulphuric Acid Transfer Sulphuric Acid Transfer High Pressure N2 For Drywell
& Torus (From Tank to P.S.V.)
(Not Used)
Control Rod Drive N2 Gas Condensate Pumps Inlet, Spray System
& Misc. Condenser Piping Condensate Pump Discharge to Reactor F.W.
Booster Pump Inlet to Condensate Storage Tanks Reactor F.W. (Booster Pumps Disch. to F.W.
Pumps Inlet)
Reactor F.W. Booster Pump Discharge for Moist. Sep.
Cooling H.P. Hydro Pump Discharge Condensate Normal Supply to Control Rod Drive Pumps Fuel Pool Cooling Filtration & Drains Demineralized Make-Up Water Demineralizer Drains Spare Condensate Storage
& Transfer Condensate Storage
& Transfer Condensate Make-Up to Torus (From Condensate Transfer Sys.
BV)
Condensate Hake-Up to Torus (Torus to 1st B.V.)
Condensate Hake-Up to Main Condenser (From Storage Surge Tanks)
Emergency Condenser Make-Up Emergency Condenser Shell Vent, Drain & Overflow Emergency Condenser Overflow Spare Reactor Clean-Up
- Sys, Safety Valve Discharge (to Check Valves at Torus)
Reactor Clean-Up Safety Valve Discharge (Torus to Check Valve)
& Line Vents to Condenser Feedwater Safety Valve Discharge Hain Steam Line Power Operated Relief Valve Discharge Misc. Contaminated Vents Drawing & Leak-Offs Drywell & Torus Vacuum Relief (Vessel to 1st B.V.)
Misc. (not Contaminated)
Vents Drains
& Leak-Offs AP-5.0
-20 February 1986
APPENDIX A (CONT'D)
SYSTEM CODES UNIT 1 SYSTEM CODE 70 70.1 71 72 72.1
- 72. 2 73 74 75 76 77 77.1 77.2 77.3 77.4 77.5 78 79 80 80.1 81 81.1 82 83 83.1 84 85 86 87 88 89 90 91 92 93 94 95 96 TZ1'Lg Reactor Bldg.
d Waste Bldg.
Closed Zaop Coolitg (Decorated Demineralized water)
Waste Bldg. Closed Loop Cooling Turbine Bldg. -
Closed Loop Cooling (Deaerated Demineralized Water)
Service Water Lawn Sprinkling System Lawn Sprinkling System Screen Washing Main Condenser Circ. Water Main Condenser Circ. Water Box Vents Main Condenser Air Removal Condenser Off Gas From Jet Air Ejectors Condenser Off Gas (Recombiner Inlet to Recombiner Condenser Inlet)
Condenser Off Gas (Recombiner Outlet to existing Connection at.
Chimney)
Condenser Off Gas (Inlet to Vacuum Pumps to Outlet of the Off-Gas Moisture Separator)
Condenser Off Gas (Mixing Jet Inlet to Recombiner Inlet)
Condenser Off Gas (Chillers to deicing water buffer tank, tank outlet)
Turbine Gland Seal Exhaust Diesel Generator Cooling Water Containment Sprays Outside Drywell Containment Spray Inside Drywell Reactor Core Spray Reactor Core Spray After Topping Pump Fuel Oil Handling 6.,Storage Drywell Pump Discharge Piping (Outside 1st External Isolation Valve)
Drywell Sump Piping (Drywell Sump to Extra I.V.)
Reactor Building Sump Discharge Piping Radioactive Waste Disposal (Non-Corrosive)
Mis. Building Sump Discharge Piping Caustic Soda Transfer Misc. Line Drains in Drywell After Last Valve Misc.
Line Drains in Reactor Bldg.
After Last Valve (Piping Upstream of Last Valve to be Same as Principle Line or Source)
Misc.
Line Drains in Reactor Bldg. After Last Valve (Piping Ustream of Last Valve to be Same as Principle Line or Source)
Sealing Water (Condensate or Filtered)
Incore Monitoring Containment Spray Cooling Raw Water Instrument Air-Atmos. to Dryer House Service Air Diesel Generator Starting Air AP-5 '
-21 February 1986
APPENDIX A (CONT'D)
SYSTEM CODES UNIT 1 SYSTEM CODE 97 97.1 98 98.1 98.2 98.3 99 100 101 102 103 103.1 104 105 106 107 108 109 U.O 111 111.1 112 113 114 115 116 117 117.1 118 119 190 201 201.1 201.2 201.3 201.4 201.5 201.6 TZTZZ Turbine Oil Storage g Purification Turbine Oil Vents Electric Steam Boiler 811 Electric Steam Boiler 812 (Condensate Return)
Electric Steam Boiler 812 (Saturated Steam)
Liquid Waste System Cleaning (Hot mixture of Condensate
& Steam)
C02 (Fire Protection
& Generator Purging)
Fire Protection - Water &'Foam Transformer Fire. Protection Spare City Water (Cold)
City Water (Hot)
Roof
& Floor Drains (Non-Radioactive)
(Gravity Flow Drains) Equipment Drains Sanitary Sewerage L.P. Inst.
H.P. Inst.
Misc. Inst.
Samples Hydrogen (H2) Supply for Generator Hydrogen (H2) Vent & Drain Condenser Off Gas
& Stack Gas Samples Instrument Air (After Dryer)
Breathing Air (After Filter)
Yard Drainage Low Pressure Air Laboratory Drains Laboratory Drains Where Noted Gas Supply to Lab Laboratory Vac. Sys.
Freon Refrigeration System for Off Gas Chillers Reactor Containment Cooling, Air Purge Drywell Vent & Purge Air & N2 (Drywe11 to 1st I.V.)
Reactor Containment N2 Purge
& Fi11 Truck Fill Conn. to N2 Vaporizer Reactor Cont.
N2 Purge
& Fill Where Specified Leak Rate Monitoring Inside Drywell Vessel Leak Rate Monitoring Outside Drywell to Including Auto Isolation Valve AP"5.0
-22 February 1986
APPENDIX A (CONT'D)
SYSTEM CODES UNIT 1 SYSTEM CODE 201.7 201.8 201.9 201.11 202 202.1 203 204 206 208 209 210 211 TZTIZ Coatainaent Radiation Monitoting Reactor Containment (Drywell & Torus) Inert Gas (N2) Supply 812 Reactor Containment (Drywell & Torus) Inert Gas (N2) Supply 811 Reactor Containment (Drywell & Torus) Inert Gas (N2) Supply dU.
(Between Sys.
201.9
& 201.2)
Reactor Bldg. Ventilation Exhaust System Misc. Equipment Vents Connected to Bldg. Ventilation Duct Turbine Building Ventilation Exhaust System Waste Disposal Building Ventilation Equipment Sewerage Treatment
& Equipment (Outside of Plant)
Reheater Drying System Equipment (Downstream of Last Blocking Valve)
Miscellaneous Control Room Heating, Vent
& Air Conditioning Add. Building Air Conditioning, Heating
& Ventilating System The above system numbers reflect mechanicl piping numbers to designate the electrical portion of these
- systems, place a
capital "E" after the number.
For
- example, 34E would concern itself with some electrical apparatus in the head spray sys.
AP-S.O
-23 February 1986
APPENDIX A (CONT'D)
SYSTEM CODES UNIT 1 SYSTEM CODE ADM ANN AMPM BB COMP CONT DG DWMI ELM FBF FP FWC GEN INSTs LAB NEU PAGE PWRB RFBR RSD RST RXVE RXVI RXBM SB SEC SHM SEOI STWT SWYD TIP TRNA TSI TBM WBM WI WS YDS TBTBB Adnandsczacdcn Bni1ding Mdsc.
Annunciator Area Monitors-Process Monitors Battery Board Computer Control Room Miscellaneous Diesel Generators Drywell Misce11aneous Electrical Monitors Flat Bed Filter Fire Protection Feedwater Controls Generator Miscellaneous Instrument Miscel1aneous Laboratory Miscellaneous Nuetron Monitors (SRM's, IRM's, LPRM's)
Paging System Power Boards Performance Calculation Refuel Bridge Reheat Steam Drains Reactor Servicing Tools Reactor Vessel Reactor Vessel Instrumentation Reactor Building Miscellaneous Station Batteries Security Screen House Miscellaneous Seal Oil Stator Water Switchyards Transverse Incore Probe Transformers Turbine Supervisory Instruments Turbine Building Miscellaneous Waste Building MisceU.aneous Wind Instruments Weather Station Yards AP-5.0
-24 February 1986
APPENDIX B SYSTEM CODES UNIT 2 SYSTEM CODE ABH ABS ADS ASR ASS BWS BYS CCP CCS CEC CES CMS COJ BIP NUMBER 20 48 48 48 48 20 34 40 71 92 73,74 11,13 14 103 31 82 76 SYSTEM DESCRIPTION BREATHING AIR AUXILIARYBOILER-BLOWDOWN AUXILIARYBOILER-FEEDWATER AND CONDENSATE AUXILIARYBOILER-CHEMICAL FEED AUXILIARYBOILER-STEAM AUXILIARYBOILER - SYSTEM AUTOMATIC DEPRES SURIZATION-SYSTEM AIR REMOVAL-MAINCONDENSER AUXILIARYSTEAM-RADWASTE AUXILIARYSTEAM-NUCLEAR-STEAM TRANSFORMER, AUX PWR INCLUDING AUXILIARIES BATTERY-24V-STATION BATTERY-125V-STATION COMPONENT COOLING-REACTOR COMPONENT COOLING-TURBINE PLANT COMMON ELECT EQUIP-CONTROL RM COMPLEX COMMON ELECT-SYSTEM CONTAINMENT ATMOSPHERE MONITORING-SYSTEM CONDENSATE-AUXILIARYCONDENSATE CONDENSATE-DEMINERAIJ ZER CONDENSATE-MAIN COND~TE CONDENSATE-PUMP LUBE OIL SYSTEM CONDENSATE-MA1KUP, DRAWOFF COMMUNICATIONS (MAINTENANCE)
-25 February 1986
APPENDIX B (Cont.)
SYSTEM CODES UNIT 2 SYSTEM CODE COP COS CPS CSH CSL DFD DFE DFT DMS DSM DSR DWS EGF BIP NUMBER 76 76 61 33 32 10A 102 63,67 64 66 66 66 63>67 64 65 35, 74 60 2
2 66 50 100A,100B 100A,100B SYSTEM DESCRIPTION COMMUNICTIONS (PAGING)
COMMUNICATIONS (SOUND POWERED)
REACTOR CONTAINMENT (PURGE)
COLD REHEAT-SYSTEM CORE SPRAY-HIGH PRESSURE CORE SPRAY-LOW PRESSURE CIRCULATING WATER DECONLQGNATZON-SYSTEM DRAINS-REACTOR BLDG EQUIP DRAINS-TURBINE BLDG EQUIP DRAINS, FLOOR-DIESEL GEN BLDG DRAINS, FLOOR-SERVICE AREA DRAINS, FLOOR-MISC BLDGS DRAINS, FLOOR-REACTOR PLANT DRAINS, FLOOR-TURBINE PLANT DRAINS, FLOOR-RADWASTE BLDG MOTOR CONTROL CENTER DC-SYSTEM DRYWELL COOLING-SYSTEM DRAINS MOISTURE SEPARATOR DRAINS-MOISTURE SEPARATOR REHEATER DRAINS-TURBINE PLANT MISCELLANEOUS DOMESTIC WATER-SYSTEM GENERATOR, EMER-AZR COMPR-DIESEL STARTING AZR GENERATOR, EMER-FUEL SYSTEM AP"5.0
-26 February 1986
APPENDIX B (Cont.)
SYSTEM CODES UNIT 2 SYSTEM CODE EGP EGS EGT BIP NUMBER 100A,100B 100A,100B 100A,100B 100A,100B 23 SYSTEM DESCRIPTION GENERATOR, STBY LUBE OIL SYSTEM GENERATOR, EMER-PROTECTION (INCLUDE ACB & INST)
GENERATOR, EMER-SYSTEM GENERATOR, STANDBY, TEMPERATURE ELECTRO HYDRAULIC CONTROL EHS 72 MOTOR CONTROL CENTER-EMERGENCY-SYSTEM EPS ERS ESS EXS FOF FPF FPL FPM FPW 72 72 72 29 40 90 68 68 39 39 43 44 46 45 47 43 UNIT SUBSTATION-EMERGENCY-AC CONT
& HTR SUPPLY UNIT SUBSTATION-EMERGENCY-SYSTEM
- SWGR, EMER, 4160V-SYSTEM
- SWGR, STBY, 13. SKV SYSTEM EMERGENCY RESPONSE FACILITY EARTHQUAKE RECORDING SYSTEM EXTRACTION-SYSTEM EXCITATION-MAINGENERATOR-SYSTEM (COOLING)
EXCITATION-MAINGENERATOR-SYSTEM (POWER CKT'S)
FUEL-NUCLEAR - REPtKLING FUEL HANDLING-SYSTEM FUELWIL - ENGINE DRIVEN FIRE PUMP FIRE PROTECTION - FOAM SYSTEM FIRE PROTECTION HALON FIRE PROTECTION LOW PRESSURE C02 FIRE PROTECTION SUPERVISION SYSTEM FIRE PROTECTION WATER FEEDWATER - PUMP
& MOTOR OIL SYSTEMS AP-5.0
-27 February 1986
APPENDIX B (Cont.)
SYSTEM CODES UNIT 2 SYSTZM CODE FWS GMC GSN HCS HTS BIP NUMBER 6I 7
26 27 24
~ 68 88 61 62 40,41,82 53,54,59A 59C 49 49 59C 59B 54 SYSTEM DESCRIPTION FEEDWATER & CONDENSATE PUMP-SEALS
& LEAKOFF FEEDWATER RECIRCULATION FZEDWATER SYSTEM GENERATOR, MAIN-STATOR COOLING GENERATOR, MAIN-HYDROGEN & C02 GENERATOR, MAIN-LEADS GENERATOR, MAIN-SEAL OIL GENERATOR, MAIN-SYSTEM GAS-NITROGEN SYSTEM GAS TREATMENT, STANDBY-SYSTEM HYDROGEN RECOMBINER SYSTEM (POST DBA)
HEATER DRAINS HIGH PRESSURE HEATER DRAINS - LOW PRESSURE HOT REHEAT SYSTEM HEAT TRACING-SYSTEM AIR COND. CONTROL BLDG OR AREA VENTILATIONSERVICE BLDG GLYCOL KEATING SYSTEM HOT WATER HEATING SYSTEM VENTILATION AUX BOILER ROOM CHILLED WATER CONTROL BLDG AZR CONDITIONING SERVICE BLDG CHILLED WATER - VENTILATION VENTILATION-DIESEL GZN BLDG AP-5.0
-28 February 1986
APPENDIX B (Coat.)
SYSTEM CODES UNIT 2 SYSTEM CODE ICS ZHS ISC ISG LMS BIP NUMBER 56 58,59C 19,34 35 103 91,103 40 28 77 75 75 75 75 75 75 75 75 75 75 75 81 SYSTEM DESCRIPTION VENTILATION-REACTOR PLANT VENTILATION-TURBINE PLANT VENTILATION-RADWASTE BLDG VENTILATIONYARD STRUCTURES INSTRUMENT AIR SYSTEM REACTOR CORE ISOLATION COOLING - SYSTEM INFORMATION HANDLING-ANNUNCIATOR INFORMATION HANDLING - COMPUTER INFORMATION HANDLING SECURITY INSTRUMENTATZON SYSTEM - NUCLEAR BOILER GROUNDING SYSTEM LIGHTING, AC-CONTROL ROOM (MAIN)
LIGHTING, AC-DIESEL GENERATOR ROOM LIGHTING, AC-COOLING TOWER 6 POND AREA LIGHTING, AC-MISC BLDGS LIGHTING, AC-RADWASTE BLDG LIGHTING, AC-REACTOR BLDG LIGHTING, AC-SYSTEM (SUPPLY)
LIGHTING, AC-TURBINE AREA LIGHTING, AC-SCREENWPZJ AND PUMPHOUSE LIGHTING, AC-AUXIZZARYBOILER ROOM LIGHTING, AC-SWYD OR SUBSTA (INCLUDING CONT HSE)
LIGHTING, AC-SERVICE BLDG LEAKAGE MONITORING SYSTEM AP-5.0
-29 Pebruary 1986
APPENDIX B (Cont.)
SYSTEM CODES UNIT 2 SYSTEM CODE LOS LWS MHS MSS NHS NJS BIP NUMBER 22B 86 40 101 101 101 84 101 101 101 108 1,21,85 69 16 71A,71B 92 92 92 94 92 71A SYSTEM DESCRIPTION LUBE OIL (TREATMENT AND STORAGE ONLY) SYSTEM LOOSE PARTS MONITORING - SYS.
LIQUID WASTE (RADIOACTIVE) - SYSTEM MOTOR OPERATED DOORS SYSTEM MAT HANDLING (CRANES, HOISTS, ETC) - MISC BLDGS MATERIAL HANDLING RADWASTE BLDG MAT HANDLING(CRANES, HOISTS, ETC)-
REAC BLDG(CONTNMT)
MAT. HANDLING (CRANES, HOIST)
SYSTEM MAT. HANDLING (CRANES, HOISTS, ETC)-TURBINE AREA MAT HANDLING(CRANES, HOISTS, ETC)-
SCREENWELL 6 PP HSE METROLOGICAL MONITORING SYSTEM MAIN STEAM SYSTEM MN TRANS INCL AUXZLLQtZES (COOLERS, LTC, ALARMS, ETC)
MAKEUP WATER SYSTEM (RAW WATER)
MOTOR CONTROL CENTER, NORMAL - SYSTEM UNIT SUBSTATION SYSTEM NEUTRON MONITORING SYSTEM NEUTRON MONITORING SYSTEM (INTERMEDIATE)
NEUTRON MONITORING SYSTEM (POWER)
NEUTRON MONITORING (TRAVERSE ENCORE PROBE)
NEUTRON MONITORING (SOURCE)
-30 February 1986
APPENDIX B (Cont.)
SYSTEM CODES UNIT 2 SYSTEM CODE NPS OFG PBS PCS RCS RMS RPS RSS SAS SCM SFC SLS SPF SPG SPI BIP NUMBER 42 51 77 29,71A 18 30 31 79580 97 106 78 70 19 71 72 72 38 36 70 68 70 AP-S.O SYSTEM DESCRIPTION
- SWGR, NORMAL, 13.8KV-SYSTEM OFF GAS SANITARY SEWERAGE FACILITIES - SYSTEM PROTECTION, CATHODIC-SYSTEM REACTOR RECIRCULATION ROOF DRAINS (HANGERS)
REACTOR ROD DRIVE - SYSTEM RESIDUAL HEAT REMOVAL - SYSTEM RADIATION MONITORING SYSTEM REACTOR PROTECTION SYSTEM ~ SET REACTOR PROTECTION - SYSTEM REDUNDANT REACTIVITY SYSTEM REMOTE SHUTDOWN SYSTEM RES STA SERV TRAN INCL AUXZIZARZES SERVICE AIR SYSTEM STA, CONT BUS (NONVITAL)-AC SUPPLY INCL TFMR 6 TRANS SWITCH STA, CONT BUS (NONVITAL)-INDICATION STATION CONTROL MONITORING (VITAL) INDICATION STA CONT BUS (VITAL)-AC SUPPLY SPENT FUEL-FUEL POOL CLG 6 CLZANlP (ZNC.
POOL 6 AUX)
STANDBY LIQUID CONTROL (POISONING) SYSTEM RESERVE STA SERVICE LINE STATION PROTECTION GENERATOR STATION PROTECTION GEN, MN TFMR, STA SER BUS February 1986
APPENDIX B (Cont.)
SYSTEM CODES UNIT 2 SYSTEM CODE SPM SPR SPS SPU SPX SRH SSP SSR SST SSW STX SXS SYD SYS BIP NUMBER 69 70 70 68 21 18 17 17 17 17 70 40 12 105 100A 68 21 23 25 AP-5. 0 SYSTEM DESCRIPTION STATION PROTECTION - MAIN TRANSFORMER STATION PROTECTION RES STA SERV TRANS STATION PROTECTION STA SERV TRANS STATION PROTECTION - UNIT STATION PROTECTION - AUX PWR TRANS TURBINE REHEAT (HANGERS)
STORM SEWER - ROOF DRAINAGE SAMPLING SYSTEM - POST ACCIDENT SAMPLING SYSTEM REACTOR PLANT SAMPLING SYSTEM - TURBINE PLANT (NUCLZAR)
SAMPLING SYSTEM - RADWASTE BLDG STA SERV TRANS NORMAL INCL AUXZILARZES STEAM VENTS - FEEDWATER HEATER RELIEF VENT & DRAINS STEAM VENTS SAFETY VALVES SERVICE WATER - SYSTEM SERVICE WATER - SYSTEM (HANGERS)
SEEL WATER - RADWASTE SERVICE WATER - TRAVELING SCREENS-WASH & DISPOSAL STARTUP TEST INSTRUMENTATZON - SYS SYNCHRONIZING - DIESEL GENERATOR SYNCHRONIZERG - MAIN GENERATOR SYNCHRONIZING - STATION SERVICE TURBINE, MAIN-ALARMSAND TRIPS TURBINE, MAIN-CONTROL (EHC)
TURBINE, MAINLANDSEAL & EXHAUST STEAM
-32 February 1986
APPENDIX B (Coat.)
SYSTEM CODES UNIT 2 SYSTEM CODE BIP NUMBER SYSTEM DESCRIPTION VBA VBB VBS lt WCS WSS 21 21 18 72 71B,75 72 26,22A 37 22C 71B 41 10B 10C 10A,15 70 70 69 MAIN-TURNING GEAR TURBINE, MAIN-SUPERVISORY INSTRUMENTATION TURBINE, MAIN-LUBE OIL TURBINE, MAIN-SYSTEM ROOF DRAINS (HANGERS)
VITAL BUS - AC SUPPLY (TO BUS)
VITAL BUS - DC SUPPLY (TO INVERTER)
VITAL BUS-SYSTEM(INCOMING SUPPLY FROM ZNVERTER)
VENTS, TURBINE PLANT EQPT REACTOR WATER CLEANUP SYSTEM WASTE OIL DISPOSAL - SYSTEM WELDING POWER-SYSTEM SOLID WASTE (RADIOACTIVE) - SYSTEM WATER TREATING - ACID TR1UZMENT
'ATER TREATING - HYPOCHLORZTE WATER TREATING - SYSTEM 115KV SWYD/SUB STA-BUS DIFF/PT's 115KV SWYD/SUBSTA 345KV SWYD/SUBSTA AP-5.0
-33 February 19S6
APPENDIX C NPRDS CODES NPRDS FAILURE SYMPTOM CODE The code indicating the first effect of the failure observed when the failure was discovered.
Choose one of the following:
A - Physical Fault-A failure is characterized by a changed physical condit1on, physical configuration, fracture or
- damage, often resulting in a loss of integrity or ability to hold a
contained fluid or electrical cu'rrent.
This category includes blocked or stopped
- flow, cracks, fractures or
- breaks, collapses, physical distort1on or displacement, electrical
- arcing, open
- circuit, shorts, or degraded 1nsulation.
Leaks are considered a
special category (E or F below) due to the number of reported items.
B Out of Spec1fication A failure is characterized by operation outside the permissible range of expected output or response.
This category inc1udes out of limits, low or high output or
- flow, erratic
- output, premature
- response, off frequency, off voltage, intermittent operation or failure to synchronize or control.
C - Demand Fault failure 1s characterized by the responsible system or component failure to actuate,
- move, or change operating mode upon
- request, either operator-init1ated or from an automatic signal.
This category includes failure to
- stop, close,
- open, release,
- run, start/move, operate per
- demand, respond,
- record, or instances of no output when an input of some sort demands one D Abnormal Character1st1c-A failure is characterized by a
type of response or an operating characteristic not considered normal or expected.
This category inc1udes such attributes as overheating, unusual noise or vibration,
- chatter, corrosion, discoloration, and false response (such as non-zero output with zero input).
-34 February 1986
APPENDIX C NPRDS CODES NPRDS FAILURE SYMPTOM CODES (Cont.d)
E - Released Leakage -
A failure is indicated by external leakage of a
process fluid from within its normal pressure boundary.
This includes leaks to the environment caused by faulty packing glands, mechanical
- seals, or gasketed joints.
Also included in this category are relief valve leakage and heat exchanger tube leaks.
F Contained Leakage - A failure is characterized by leakage of the process fluid through a
closed isolation device (e.g.,
a valve) and along a normal flow path.
This inc1udes internal flow leaks such as across valve seats.
Not included (see code E) are relief valve leaks and heat exchanger tube leaks.
I AP-5.0
-35 February 1986
APPENDIX C NPRDS CODES NPRDS CORRECTIVE ACTION CODE The following is a listing of the codes used for corrective action taken to remedy a failure, along with a definition and an example for each of the codes.
Recalibrate/Adjust To reset a
device mechanically or electrically to a
prescribed valve or position.
An example of this is to calibrate an instrument string.
Specifically it would read something
- like, "Reset outputs of the flow transmitter on the shaft driven feed water pump flow instrument loop".
Some keywords to look for:
calibrate, recalibrate, ad)ust,
- readjust, set, reset.
AC Temporary Measures Repair Component/Part Actions taken to bypass maintain p oz restore a
system or component to operation for an interim period.
An example of this is to replace a
defective part with another component until either conditions permit a proper replacement, or a similar component can be purchased.
For
- example, "Added temporary pressure gauge on feedwater heater high level trip column, until.
next outage when a proper gauge can be installed".
The Key word here is:
Temporary.
To refurbish and/or reinstall a
component, including such actions as cleaning and or polishing.
An example of this would read something
- like, "Fixed circuit breaker coil and cleaned contacts for diesel generator air start compzessor motor starter."
Keywords:
- Repair, fix, refurbish,
- clean, reinstall, rebuild, reset.
-36 February 1986
e
APPENDIX C NPRDS CODES NPRDS CORRECTIVE ACTION CODE (Cont.d)
Replace Parts A piece component or part is removed and a similar or identical part is put in its place.
An example of this is "Installed new valve stem and seat in accordance to original specifications."
Key words:
- Replace, install,
- repair, fix, rebuild, added, refurbish.
Replace Component To replace the entire component with a similar or identical component.
For
- example, "Replaced defective Rosemonnt Pressure Transmitter on Feed water line with an identical unit."
Keywords:
Replace, install, repair, fix, rebuild, added, refurbish.
AP-5.0'37 February 1986
APPENDIX C NPRDS CODES NPRDS CAUSE OF FAILURE CODE MECHANICAL CAUS ES Foreign/Incorrect Material Material not as spec1fied or internal environment containing an unanticipated material (e.g., water).
Particulate Contamination Gas or fluid
- contents, including unexpected buildup of suspended solids.
Normal/Abnormal Wear - Loss of function due to a
gradual loss of configuration or material.
Lubrication Problem Frictional failure directly attributable to lack of proper lubrication.
- crack, or heat-affected zone failure attr1butable to the fielding process.
AG Abnormal Stress Material stress attributable to abnormal
- load, vibration, temperature, pressure or flow.
AV Connection Defective/Loose Parts Loose mechanical parts or fasteners.
Material Defect Material
- type as specified, but with integrity compromised due to a flaw or leak.
BB Mechanical Damage/Binding Loss of proper mechanical configuration due to excessive forces.
BC Out of Mechanical Adjustment - Loss of proper mechanical al1gnment, movement
- limits, or conf1guration not due to damage.
Loose setscrews,
- locknuts, mechanical
- stops, and setpoints of adjustable fixtures are included.
BD Aging/Cycl1c Fatigue Time-related degradation of mechanical properties without significant loss of material (as through wear).
Includes radiation
- damage, embrittlement, and fatigue cracking of mater1al subjected to stress reversals.
BE Dirty Loss of function due to deposition of extraneous material on operating surfaces such as circuit breaker moving parts, pilot valve
- seats, etc.
BF Blocked/Obstructed - Loss of flow function due to lodged objects or solids.
May also be loss of movement due to mechanical interference other than binding.
BG Corrosion Failure attributable to loss of material or buildup of chemical reaction products from electro-chemical or stress-aided corrosion.
-38 February 1986
APPENDIX C NPRDS CODES NPRDS CAUSE OF FAILURE CODE (Cont.d)
ELECTRICAL/ELECTRONIC CAUSES AG Abnormal Stress Loss of function due to stress-related causes attributable to voltage spikes, oscillations, etc.
Insulation Breakdown
Loss of electrical circuit integrity, including
- shorts, arcs, burned
- windings, etc.,
attributable to failure of the insulation itself.
Short/Grounded -
Loss of electxical circuit integrity due to a
shorted or gxounded circuit.
AT Open Circuit Inopexability of electrical circuit due to a break in conductor or contacts not made up.
AU Contacts Burned/Pitted/Corroded - Inoperability of electrical circuit due to degradation of electrical contacts.
AV Connection Defective/Loose Parts
<< Electrical terminal connection loose, intermittent, or containing high electrical resistance.
Circuit Defective Electrical or electronic circuit fault not attributable to any one subcomponent, component, or part, including unknown electronic faults or failuzes not reproducible.
Burned/Burned Out Loss of e1ectrical cizcuit integrity, including insulation breakdown due to local combustion,
- overload, and/or electrical fire.
Electrical Overload - Loss of function specifically attributable to unanticipated high electrical curxent.
Material Defect - Material type as specified but with integrity compxomised by a flaw.
BE Dirty Loss of function due to deposition of extraneous material on opezating suzfaces such as electrical contacts.
Corrosion Failure attributable to loss of material or buildup of chemical reaction products from electxo-chemical corrosion.
-39 February 1986
APPENDIX C NPRDS CODES NPRDS CAUSE OF FAILURE CODE {Cont.d)
ADJUSTMENT/HUMAN-RELATED Foreign/Wrong Part - Part does not belong in responsible component or system.
This includes poor designs and misapplications.
Setpoint Drift -
Electronic drift attributable to poor control setpoint stability.
Relief valve setpoint changes during operation due to pilot valve seat bleed rate changes may be included but not changes due to previous repair or mechanical adjustment.
Previous Repair/Installation Status Inadequate repair condition resulting from lack of proper previous maintenance, installation, or restoration to operational status, Incorrect Procedure - Failure directly attributable to an inadequate or improper instruction or approved procedure.
BC Out of MechanicaL Ad)ustment - Loss of proper mechanical alignment, movement
- limits, or configuration not due to damage.
Loose setscrews,
- locknuts, mechanical
- stops, and settings of adjustable fiztures are included.
BH Out of Calibration -
Electrical/mechanical setpoint or= response settings (lead, lag, or reset) not in the specified position or range.
Incorrect Action Loss of proper function directly due to human error.
&0 February 1986