| title = IR 05000390-13-503; 10/28/2013 - 11/01/2013; Watts Bar Nuclear Plant, Unit 1; Exercise Evaluation and Baseline Inspection
| title = IR 05000390-13-503; 10/28/2013 - 11/01/2013; Watts Bar Nuclear Plant, Unit 1; Exercise Evaluation and Baseline Inspection
| author name = Bonser B R
| author name = Bonser B
| author affiliation = NRC/RGN-II/DRS/PSB1
| author affiliation = NRC/RGN-II/DRS/PSB1
| addressee name = Shea J W
| addressee name = Shea J
| addressee affiliation = Tennessee Valley Authority
| addressee affiliation = Tennessee Valley Authority
| docket = 05000390
| docket = 05000390
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:November 7, 2013
[[Issue date::November 7, 2013]]


Mr. J.Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 4D-C  Chattanooga, TN 37402-2801
==SUBJECT:==
WATTS BAR NUCLEAR PLANT EMERGENCY PREPAREDNESS INSPECTION


SUBJECT:  WATTS BAR NUCLEAR PLANT EMERGENCY PREPAREDNESS INSPECTION          REPORT 05000390/2013503
REPORT 05000390/2013503


==Dear Mr. Shea:==
==Dear Mr. Shea:==
On November 1, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Watts Bar Nuclear Plant, Unit 1. The enclosed inspection report documents the inspection results that were discussed on November 1, 2013, with Mr. Tim Cleary and other members of plant staff.
On November 1, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Watts Bar Nuclear Plant, Unit 1. The enclosed inspection report documents the inspection results that were discussed on November 1, 2013, with Mr. Tim Cleary and other members of plant staff.


The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings were identified.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter, its Enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), which is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Based on the results of this inspection, no findings were identified.


Sincerely,/RA/       Brian Bonser, Chief       Plant Support Branch 1 Division of Reactor Safety Docket No. 50-390 License No. NPF-90
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's
"Rules of Practice," a copy of this letter, its Enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), which is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,
/RA/  
 
Brian Bonser, Chief  
 
Plant Support Branch 1  
 
Division of Reactor Safety  
 
Docket No. 50-390 License No. NPF-90  


===Enclosure:===
===Enclosure:===
Inspection Report 05000390/2013503  
Inspection Report 05000390/2013503 w/Attachment: Supplementary Information
 
REGION II==
Docket No:
05000390
 
License No:
NPF-90
 
Report No:
05000390/2013503
 
Licensee:
Tennessee Valley Authority
 
Facility:
Watts Bar Nuclear Plant, Unit 1
 
Location:
Spring City, TN
 
Dates:
October 28, 2013 - November 1, 2013
 
Inspectors:
M. Speck, Senior Emergency Preparedness Inspector
 
S. Sanchez, Senior Emergency Preparedness Inspector
 
W. Loo, Senior Health Physicist
 
R. Monk, Senior Resident Inspector
 
Approved by:


===w/Attachment:===
Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety
Supplementary Information cc:  Distribution via Listserv November 7, 2013 Mr.


=SUMMARY OF FINDINGS=
=SUMMARY OF FINDINGS=
IR 05000390/2013503; October  
IR 05000390/2013503; October 28 - November 1, 2013; Watts Bar Nuclear Plant, Unit 1;
 
Exercise Evaluation and Baseline Inspection


- November 1, 2013; Watts Bar Nuclear Plant, Unit 1; Exercise Evaluation and Baseline Inspection  The report covered an announced inspection by two emergency preparedness inspectors, one senior health physicist, and one senior resident inspector. No findings were identified.
The report covered an announced inspection by two emergency preparedness inspectors, one senior health physicist, and one senior resident inspector. No findings were identified.


=REPORT DETAILS=
=REPORT DETAILS=


==REACTOR SAFETY==
==REACTOR SAFETY==
 
===Cornerstone: Emergency Preparedness===
===Cornerstone:===
1EP1 Exercise Evaluation
Emergency Preparedness 1EP1 Exercise Evaluation


====a. Inspection Scope====
====a. Inspection Scope====
Line 56: Line 101:


The onsite inspection consisted of the following review and assessment:
The onsite inspection consisted of the following review and assessment:
* The adequacy of the licensee's performance in the biennial exercise, conducted on October 30, 2013, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards (RSPS) in 10 CFR 50.47 (b)(4), (5), (9), and (10) which address emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.
* The adequacy of the licensees performance in the biennial exercise, conducted on October 30, 2013, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards (RSPS) in 10 CFR 50.47 (b)(4), (5), (9), and (10)which address emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.
* The overall adequacy of the licensee's emergency response facilities with regard to NUREG-0696, "Functional Criteria for Emergency Response Facilities," and Emergency Plan commitments. The facilities assessed were the Control Room Simulator, Technical Support Center (TSC), Operations Support Center (OSC), and Central Emergency Control Center (CECC).
* The overall adequacy of the licensees emergency response facilities with regard to NUREG-0696, Functional Criteria for Emergency Response Facilities, and Emergency Plan commitments. The facilities assessed were the Control Room Simulator, Technical Support Center (TSC), Operations Support Center (OSC), and Central Emergency Control Center (CECC).
* Other performance areas, such as the emergency response organization's (ERO) recognition of abnormal plant conditions; command and control, intra- and inter- facility communications; prioritization of mitigation activities; utilization of repair and field monitoring teams; interface with offsite agencies; and the overall implementation of the emergency plan and its implementing procedures.
* Other performance areas, such as the emergency response organizations (ERO)recognition of abnormal plant conditions; command and control, intra-and inter-facility communications; prioritization of mitigation activities; utilization of repair and field monitoring teams; interface with offsite agencies; and the overall implementation of the emergency plan and its implementing procedures.
* Past performance issues from NRC inspection reports and Federal Emergency Management Agency (FEMA)/Department of Homeland Security (DHS) exercise reports to determine the effectiveness of corrective actions as demonstrated during this exercise to ensure compliance with 10 CFR 50.47(b)(14).
* Past performance issues from NRC inspection reports and Federal Emergency Management Agency (FEMA)/Department of Homeland Security (DHS) exercise reports to determine the effectiveness of corrective actions as demonstrated during this exercise to ensure compliance with 10 CFR 50.47(b)(14).
* The post-exercise critique process and the presentation to the licensee's senior management conducted on October 31, 2013, to evaluate the licensee's self-assessment of its ERO performance during the exercise, and to ensure compliance with 10 CFR 50, Appendix E, Subsection IV.F.2.g.
* The post-exercise critique process and the presentation to the licensee's senior management conducted on October 31, 2013, to evaluate the licensees self-assessment of its ERO performance during the exercise, and to ensure compliance with 10 CFR 50, Appendix E, Subsection IV.F.2.g.


The inspectors reviewed various documents which are listed in the Attachment. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.
The inspectors reviewed various documents which are listed in the Attachment. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|1EP8}}
{{a|1EP8}}
 
==1EP8 Exercise Evaluation - Scenario Review==
==1EP8 Exercise Evaluation - Scenario Review==
{{IP sample|IP=IP 71114.08}}
{{IP sample|IP=IP 71114.08}}


====a. Inspection Scope====
====a. Inspection Scope====
Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC using IP 71114.08, "Exercise Evaluation - Scenario Review," to determine if the exercise would test major elements of the emergency plan as required by 10 CFR 50.47(b)(14). This inspection activity represents one sample on a biennial cycle.
Prior to the inspection activity, the inspectors conducted an in-office review of the  
 
exercise objectives and scenario submitted to the NRC using IP 71114.08, Exercise  
 
Evaluation - Scenario Review, to determine if the exercise would test major elements  
 
of the emergency plan as required by 10 CFR 50.47(b)(14). This inspection activity  
 
represents one sample on a biennial cycle.


====b. Findings====
====b. Findings====
No findings were identified  
No findings were identified


==OTHER ACTIVITIES==
==OTHER ACTIVITIES==
{{a|4OA1}}
{{a|4OA1}}
==4OA1 Performance Indicator Verification==
==4OA1 Performance Indicator Verification==
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors sampled licensee submittals relative to the performance indicators (PI)listed below for the period July 1, 2012, through June 30, 2013. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in NEI 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6 was used to confirm the reporting basis for each data element.
The inspectors sampled licensee submittals relative to the performance indicators (PI)listed below for the period July 1, 2012, through June 30, 2013. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in NEI 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6 was used to confirm the reporting basis for each data element.


Emergency Preparedness Cornerstone
Emergency Preparedness Cornerstone
* Emergency Response Organization Drill/Exercise Performance (DEP)
* Emergency Response Organization Drill/Exercise Performance (DEP)
* Emergency Response Organization Readiness (ERO)
* Emergency Response Organization Readiness (ERO)
* Alert and Notification System Reliability (ANS)   For the specified review period, the inspectors examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspectors verified the accuracy of the DEP through review of a sample of drill and event records. The inspectors reviewed selected training records to verify the accuracy of the ERO PI for personnel assigned to key positions in the ERO. The inspectors verified the accuracy of the PI for ANS reliability through review of a sample of the licensee's records of periodic system tests. Licensee procedures, records, and other documents reviewed within this inspection area are listed in the Attachment.
* Alert and Notification System Reliability (ANS)  
 
For the specified review period, the inspectors examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspectors verified the accuracy of the DEP through review of a sample of drill and event records. The inspectors reviewed selected training records to verify the accuracy of the ERO PI for personnel assigned to key positions in the ERO. The inspectors verified the accuracy of the PI for ANS reliability through review of a sample of the licensees records of periodic system tests. Licensee procedures, records, and other documents reviewed within this inspection area are listed in the Attachment.


The inspectors reviewed various documents which are listed in the Attachment. This inspection activity satisfied one inspection sample for each of the three Emergency Preparedness PI, (i.e., DEP, ERO, and ANS) on an annual basis.
The inspectors reviewed various documents which are listed in the Attachment. This inspection activity satisfied one inspection sample for each of the three Emergency Preparedness PI, (i.e., DEP, ERO, and ANS) on an annual basis.
Line 93: Line 148:
No findings were identified.
No findings were identified.


{{a|4OA6}}
{{a|4OA6}}
 
==4OA6 Meetings, Including Exit==
==4OA6 Meetings, Including Exit==
On November 1, 2013, the lead inspector presented the inspection results to Mr. T. Cleary, Site Vice President, and other members of the plant staff. The inspectors confirmed that proprietary information was not provided during the inspection.
On November 1, 2013, the lead inspector presented the inspection results to Mr. T. Cleary, Site Vice President, and other members of the plant staff. The inspectors confirmed that proprietary information was not provided during the inspection.


ATTACHMENT:
ATTACHMENT:  


=SUPPLEMENTARY INFORMATION=
=SUPPLEMENTARY INFORMATION=
==KEY POINTS OF CONTACT==
===Licensee Personnel===
: [[contact::J. Addison]], Manager EP Drills and Exercises
: [[contact::T. Detchemendy]], Emergency Preparedness Manager
: [[contact::T. Cleary]], Site Vice President
: [[contact::W. Lee]], Corporate EP Manager
: [[contact::J. Parshall]], Manager, EP Program Planning and Implementation
: [[contact::M. Phillips]], EP Specialist
: [[contact::T. Morgan]], Licensing Engineer
: [[contact::M. White]], EP Specialist
==ITEMS OPENED, CLOSED, AND DISCUSSED==
None
==LIST OF DOCUMENTS REVIEWED==


}}
}}

Latest revision as of 03:24, 11 January 2025

IR 05000390-13-503; 10/28/2013 - 11/01/2013; Watts Bar Nuclear Plant, Unit 1; Exercise Evaluation and Baseline Inspection
ML13311B787
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 11/07/2013
From: Brian Bonser
NRC/RGN-II/DRS/PSB1
To: James Shea
Tennessee Valley Authority
Linda K. Gruhler 404-997-4633
References
IR-13-503
Download: ML13311B787 (10)


Text

November 7, 2013

SUBJECT:

WATTS BAR NUCLEAR PLANT EMERGENCY PREPAREDNESS INSPECTION

REPORT 05000390/2013503

Dear Mr. Shea:

On November 1, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Watts Bar Nuclear Plant, Unit 1. The enclosed inspection report documents the inspection results that were discussed on November 1, 2013, with Mr. Tim Cleary and other members of plant staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's

"Rules of Practice," a copy of this letter, its Enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), which is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Brian Bonser, Chief

Plant Support Branch 1

Division of Reactor Safety

Docket No. 50-390 License No. NPF-90

Enclosure:

Inspection Report 05000390/2013503 w/Attachment: Supplementary Information

REGION II==

Docket No:

05000390

License No:

NPF-90

Report No:

05000390/2013503

Licensee:

Tennessee Valley Authority

Facility:

Watts Bar Nuclear Plant, Unit 1

Location:

Spring City, TN

Dates:

October 28, 2013 - November 1, 2013

Inspectors:

M. Speck, Senior Emergency Preparedness Inspector

S. Sanchez, Senior Emergency Preparedness Inspector

W. Loo, Senior Health Physicist

R. Monk, Senior Resident Inspector

Approved by:

Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety

SUMMARY OF FINDINGS

IR 05000390/2013503; October 28 - November 1, 2013; Watts Bar Nuclear Plant, Unit 1;

Exercise Evaluation and Baseline Inspection

The report covered an announced inspection by two emergency preparedness inspectors, one senior health physicist, and one senior resident inspector. No findings were identified.

REPORT DETAILS

REACTOR SAFETY

Cornerstone: Emergency Preparedness

1EP1 Exercise Evaluation

a. Inspection Scope

Prior to the arrival onsite, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the U.S. Nuclear Regulatory Commission (NRC)using inspection procedure (IP) 71114.08, Exercise Evaluation, Scenario Review, to determine if the exercise would test major elements of the emergency plan as required by Title 10 of the Code of Federal Regulations (10 CFR) 50.47(b)(14).

The onsite inspection consisted of the following review and assessment:

  • The adequacy of the licensees performance in the biennial exercise, conducted on October 30, 2013, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards (RSPS) in 10 CFR 50.47 (b)(4), (5), (9), and (10)which address emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.
  • The overall adequacy of the licensees emergency response facilities with regard to NUREG-0696, Functional Criteria for Emergency Response Facilities, and Emergency Plan commitments. The facilities assessed were the Control Room Simulator, Technical Support Center (TSC), Operations Support Center (OSC), and Central Emergency Control Center (CECC).
  • Other performance areas, such as the emergency response organizations (ERO)recognition of abnormal plant conditions; command and control, intra-and inter-facility communications; prioritization of mitigation activities; utilization of repair and field monitoring teams; interface with offsite agencies; and the overall implementation of the emergency plan and its implementing procedures.
  • The post-exercise critique process and the presentation to the licensee's senior management conducted on October 31, 2013, to evaluate the licensees self-assessment of its ERO performance during the exercise, and to ensure compliance with 10 CFR 50, Appendix E, Subsection IV.F.2.g.

The inspectors reviewed various documents which are listed in the Attachment. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.

b. Findings

No findings were identified.

1EP8 Exercise Evaluation - Scenario Review

a. Inspection Scope

Prior to the inspection activity, the inspectors conducted an in-office review of the

exercise objectives and scenario submitted to the NRC using IP 71114.08, Exercise

Evaluation - Scenario Review, to determine if the exercise would test major elements

of the emergency plan as required by 10 CFR 50.47(b)(14). This inspection activity

represents one sample on a biennial cycle.

b. Findings

No findings were identified

OTHER ACTIVITIES

4OA1 Performance Indicator Verification

a. Inspection Scope

The inspectors sampled licensee submittals relative to the performance indicators (PI)listed below for the period July 1, 2012, through June 30, 2013. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in NEI 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6 was used to confirm the reporting basis for each data element.

Emergency Preparedness Cornerstone

  • Emergency Response Organization Drill/Exercise Performance (DEP)
  • Emergency Response Organization Readiness (ERO)
  • Alert and Notification System Reliability (ANS)

For the specified review period, the inspectors examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspectors verified the accuracy of the DEP through review of a sample of drill and event records. The inspectors reviewed selected training records to verify the accuracy of the ERO PI for personnel assigned to key positions in the ERO. The inspectors verified the accuracy of the PI for ANS reliability through review of a sample of the licensees records of periodic system tests. Licensee procedures, records, and other documents reviewed within this inspection area are listed in the Attachment.

The inspectors reviewed various documents which are listed in the Attachment. This inspection activity satisfied one inspection sample for each of the three Emergency Preparedness PI, (i.e., DEP, ERO, and ANS) on an annual basis.

b. Findings

No findings were identified.

4OA6 Meetings, Including Exit

On November 1, 2013, the lead inspector presented the inspection results to Mr. T. Cleary, Site Vice President, and other members of the plant staff. The inspectors confirmed that proprietary information was not provided during the inspection.

ATTACHMENT:

SUPPLEMENTARY INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

J. Addison, Manager EP Drills and Exercises
T. Detchemendy, Emergency Preparedness Manager
T. Cleary, Site Vice President
W. Lee, Corporate EP Manager
J. Parshall, Manager, EP Program Planning and Implementation
M. Phillips, EP Specialist
T. Morgan, Licensing Engineer
M. White, EP Specialist

ITEMS OPENED, CLOSED, AND DISCUSSED

None

LIST OF DOCUMENTS REVIEWED