IR 05000313/2018001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:ril 30, 2018
{{#Wiki_filter:April 30, 2018


==SUBJECT:==
==SUBJECT:==
Line 35: Line 35:


Sincerely,
Sincerely,
/RA/
/RA/  
Neil OKeefe, Chief Branch E Division of Reactor Projects Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6
 
Neil OKeefe, Chief Branch E Division of Reactor Projects  
 
Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6  


===Enclosure:===
===Enclosure:===
Line 43: Line 46:


==Inspection Report==
==Inspection Report==
Docket Numbers: 05000313; 05000368; and 07200013 License Numbers: DPR-51; NPF-6 Report Numbers: 05000313/2018001; 05000368/2018001; and 07200013/2017001 Enterprise Identifier: I-2018-001-0005 Licensee: Entergy Operations, Inc.
Docket Numbers:
05000313; 05000368; and 07200013  
 
License Numbers:
DPR-51; NPF-6  
 
Report Numbers:
05000313/2018001; 05000368/2018001; and 07200013/2017001  
 
Enterprise Identifier: I-2018-001-0005  
 
Licensee:
Entergy Operations, Inc.  
 
Facility:
Arkansas Nuclear One, Units 1 and 2, and Independent Spent Fuel
Storage Installation
 
Location:
Junction of Highway 64 West and Highway 333 South
Russellville, Arkansas
 
Inspection Dates:
January 1, 2018 to March 31, 2018
 
Inspectors:
C. Henderson, Senior Resident Inspector
P. Smagacz, Acting Senior Resident Inspector
T. Sullivan, Resident Inspector
M. Tobin, Resident Inspector
L. Brookhart, Senior Inspector
N. Greene, Ph.D., Senior Health Physicist
J. ODonnell, CHP, Health Physicist


Facility: Arkansas Nuclear One, Units 1 and 2, and Independent Spent Fuel Storage Installation Location: Junction of Highway 64 West and Highway 333 South Russellville, Arkansas Inspection Dates: January 1, 2018 to March 31, 2018 Inspectors: C. Henderson, Senior Resident Inspector P. Smagacz, Acting Senior Resident Inspector T. Sullivan, Resident Inspector M. Tobin, Resident Inspector L. Brookhart, Senior Inspector N. Greene, Ph.D., Senior Health Physicist J. ODonnell, CHP, Health Physicist Approved By: N. OKeefe, Branch Chief Enclosure
Approved By:
N. OKeefe, Branch Chief  


=SUMMARY=
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Arkansas Nuclear One, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC-identified and self-revealed findings and violations, and additional items are summarized in the tables below.
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Arkansas Nuclear One, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC-identified and self-revealed findings and violations, and additional items are summarized in the tables below.


A licensee-identified, non-cited violation is documented in report Section 71124.01.
A licensee-identified, non-cited violation is documented in report Section 71124.0


List of Findings and Violations Failure to Establish Adequate Criteria for Flood Seal Testing Cornerstone           Significance                               Cross-cutting       Inspection Aspect              Procedure Mitigating           Green Finding                               [H.12] - Avoid     71111.01 -
===List of Findings and Violations===
Systems              NCV 05000313/2018001-01 and                Complacency        External 05000368/2018001-01                                            Flooding Closed The inspectors identified a Green finding and associated non-cited violation of Unit 1 Technical Specification 5.4.1.a and Unit 2 Technical Specification 6.4.1.a for the licensees failure to establish the criteria for ensuring the necessary conditions existed for a successful test of hatch flood seals. Specifically, Procedure OP 1402.240, Inspection of Watertight Hatches,
Failure to Establish Adequate Criteria for Flood Seal Testing Cornerstone Significance Cross-cutting Aspect Inspection Procedure Mitigating Systems Green Finding NCV 05000313/2018001-01 and 05000368/2018001-01 Closed
[H.12] - Avoid Complacency 71111.01 -
External Flooding The inspectors identified a Green finding and associated non-cited violation of Unit 1 Technical Specification 5.4.1.a and Unit 2 Technical Specification 6.4.1.a for the licensees failure to establish the criteria for ensuring the necessary conditions existed for a successful test of hatch flood seals. Specifically, Procedure OP 1402.240, Inspection of Watertight Hatches,
Revision 1, did not contain adequate guidance to ensure that the auxiliary building was at a lower pressure than the turbine building such that puffing smoke on the turbine building side would allow a seal leak to be detectable.
Revision 1, did not contain adequate guidance to ensure that the auxiliary building was at a lower pressure than the turbine building such that puffing smoke on the turbine building side would allow a seal leak to be detectable.


Failure to Preplan and Perform Service Water Pre-Screen Maintenance Cornerstone           Significance                               Cross-cutting     Inspection Aspect            Procedure Mitigating           Green Finding                               [H.12] - Avoid     71152 -
Failure to Preplan and Perform Service Water Pre-Screen Maintenance Cornerstone Significance Cross-cutting Aspect Inspection Procedure Mitigating Systems Green Finding NCV 05000368/2018001-02 Closed
Systems              NCV 05000368/2018001-02                    Complacency        Problem Closed                                                        Identification and Resolution The inspectors reviewed a self-revealed, non-cited violation and associated finding of Arkansas Nuclear One, Unit 2, Technical Specification 6.4.1.a, for the licensees failure to properly preplan maintenance that can affect the performance of safety-related equipment.
[H.12] - Avoid Complacency 71152 -
Problem Identification and Resolution The inspectors reviewed a self-revealed, non-cited violation and associated finding of Arkansas Nuclear One, Unit 2, Technical Specification 6.4.1.a, for the licensees failure to properly preplan maintenance that can affect the performance of safety-related equipment.


Specifically, the licensee failed to properly preplan pre-screen cleaning maintenance, causing the train B service water system to become inoperable.
Specifically, the licensee failed to properly preplan pre-screen cleaning maintenance, causing the train B service water system to become inoperable.


Additional Tracking Items Type     Issue number               Title                           Inspection     Status Procedure URI       7200013/2012001-02         Validation of the ANO data     60855.1        Closed collected during the thermal validation test and used in the Holtec analysis
===Additional Tracking Items===
Type Issue number Title Inspection Procedure Status URI 7200013/2012001-02 Validation of the ANO data collected during the thermal validation test and used in the Holtec analysis 60855.1 Closed


Type Issue number         Title                           Inspection Status Procedure URI 7200013/2012001-03   Applicability of the ANO       60855.1    Closed thermal validation test results to other HI-STORM 100 overpack configurations LER 05000313/2016-002-00 Tornado Missile Vulnerability   71153      Closed Resulting in Condition Prohibited By Technical Specifications
Type Issue number Title Inspection Procedure Status URI 7200013/2012001-03 Applicability of the ANO thermal validation test results to other HI-STORM 100 overpack configurations 60855.1 Closed LER 05000313/2016-002-00 Tornado Missile Vulnerability Resulting in Condition Prohibited By Technical Specifications 71153 Closed


=PLANT STATUS=
=PLANT STATUS=
Line 75: Line 115:


==REACTOR SAFETY==
==REACTOR SAFETY==
 
==71111.01 - Adverse Weather Protection==
==71111.01 - Adverse Weather Protection     Seasonal Extreme Weather==
===Seasonal Extreme Weather (1 Sample)===
{{IP sample|IP=IP 71111.01|count=1}}
 
The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal cold temperatures.
The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal cold temperatures.
* Unit 1 and Unit 2 diesel fuel oil vault on January 30, 2018
* Unit 1 and Unit 2 diesel fuel oil vault on January 30, 2018
* Unit 2 emergency diesel generator 2 on January 30, 2018
* Unit 2 emergency diesel generator 2 on January 30, 2018
* Alternate ac diesel generator on January 30, 2018
* Alternate ac diesel generator on January 30, 2018
* Unit 1 and Unit 2 emergency cooling pond on January 30, 2018
* Unit 1 and Unit 2 emergency cooling pond on January 30, 2018  


===External Flooding (1 Sample)===
===External Flooding (1 Sample)===
Line 90: Line 128:
A finding associated with this inspection is documented in the Inspection Results section below.
A finding associated with this inspection is documented in the Inspection Results section below.


==71111.04 - Equipment Alignment   Partial Walkdown==
==71111.04 - Equipment Alignment==
{{IP sample|IP=IP 71111.04|count=4}}
===Partial Walkdown (4 Samples)===
 
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
: (1) Unit 2 train A emergency feedwater system during planned maintenance of train B emergency feedwater system on February 7, 2018
: (1) Unit 2 train A emergency feedwater system during planned maintenance of train B emergency feedwater system on February 7, 2018
: (2) Unit 2 swing service water pump B aligned to the emergency cooling pond during intake structure pre-screen cleaning and maintenance on February 22, 2018
: (2) Unit 2 swing service water pump B aligned to the emergency cooling pond during intake structure pre-screen cleaning and maintenance on February 22, 2018
: (3) Unit 2 emergency diesel generator 2 ventilation system on March 2, 2018
: (3) Unit 2 emergency diesel generator 2 ventilation system on March 2, 2018
: (4) Unit 1 temporary reactor vessel level identification system on March 28, 2018
: (4) Unit 1 temporary reactor vessel level identification system on March 28, 2018  


===Complete Walkdown (1 Sample)===
===Complete Walkdown (1 Sample)===
The inspectors evaluated system configurations during a complete walkdown of the Unit 2   service water system on March 14, 2018.
The inspectors evaluated system configurations during a complete walkdown of the Unit 2 service water system on March 14, 2018.
 
==71111.05 - Fire Protection Annual/Quarterly Quarterly Inspection==
{{IP sample|IP=IP 71111.05|count=4}}


==71111.05 - Fire Protection Annual/Quarterly==
===Quarterly Inspection (4 Samples)===
The inspectors evaluated fire protection program implementation in the following selected areas:
The inspectors evaluated fire protection program implementation in the following selected areas:
: (1) Unit 2 auxiliary building corridor 2109 temporary safety-related battery heating, Fire Area MM, Fire Zone 2103-V, on January 30, 2018
: (1) Unit 2 auxiliary building corridor 2109 temporary safety-related battery heating, Fire Area MM, Fire Zone 2103-V, on January 30, 2018
: (2) Unit 1 cable spreading room, Fire Area G, Fire Zone 97-R, on January 31, 2018
: (2) Unit 1 cable spreading room, Fire Area G, Fire Zone 97-R, on January 31, 2018
: (3) Unit 2 upper south piping penetration room, Fire Area EE-L , Fire Zone 2084-DD, on February 8, 2018
: (3) Unit 2 upper south piping penetration room, Fire Area EE-L, Fire Zone 2084-DD, on February 8, 2018
: (4) Unit 2 lower south piping penetration room, Fire Area EE-L, Fire Zone 2055-JJ, on
: (4) Unit 2 lower south piping penetration room, Fire Area EE-L, Fire Zone 2055-JJ, on February 8, 2018


===February 8, 2018    Annual Inspection (1 Sample)===
===Annual Inspection (1 Sample)===
The inspectors evaluated fire brigade performance in the Unit 1 control room for a simulated fire emergency feedwater pump room and the Unit 2 turbine deck for a simulated fire in the turbine generator on January 4, 2018, and March 09, 2018.
The inspectors evaluated fire brigade performance in the Unit 1 control room for a simulated fire emergency feedwater pump room and the Unit 2 turbine deck for a simulated fire in the turbine generator on January 4, 2018, and March 09, 2018.


==71111.06 - Flood Protection Measures   Internal Flooding==
==71111.06 - Flood Protection Measures==
{{IP sample|IP=IP 71111.06|count=1}}
===Internal Flooding (1 Sample)===
 
The inspectors evaluated internal flooding mitigation protections in the Unit 2 emergency feedwater room floor drain system on March 16, 2018.
The inspectors evaluated internal flooding mitigation protections in the Unit 2 emergency feedwater room floor drain system on March 16, 2018.


Line 122: Line 157:
The inspectors evaluated cable submergence protection in Manhole 8 on March 1, 2018.
The inspectors evaluated cable submergence protection in Manhole 8 on March 1, 2018.


==71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance   Operator Requalification==
==71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance==
{{IP sample|IP=IP 71111.11|count=2}}
===Operator Requalification (2 Samples)===
: (1) The inspectors observed and evaluated Unit 1 simulator training for operating crews on reactor shutdown and decay heat removal on February 22, 2018.
: (1) The inspectors observed and evaluated Unit 1 simulator training for operating crews on reactor shutdown and decay heat removal on February 22, 2018.
: (2) The inspectors observed and evaluated Unit 2 simulator training for operating crews on reactor coolant pump motor fire and security related events on February 22, 2018.
: (2) The inspectors observed and evaluated Unit 2 simulator training for operating crews on reactor coolant pump motor fire and security related events on February 22, 2018.
Line 131: Line 166:
: (2) The inspectors observed and evaluated Unit 1 reactor shutdown for commencing Refuel Outage 1R27 on March 23, 2018.
: (2) The inspectors observed and evaluated Unit 1 reactor shutdown for commencing Refuel Outage 1R27 on March 23, 2018.


==71111.12 - Maintenance Effectiveness   Routine Maintenance Effectiveness==
==71111.12 - Maintenance Effectiveness==
{{IP sample|IP=IP 71111.12|count=3}}
===Routine Maintenance Effectiveness (3 Samples)===
 
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
: (1) Unit 1 rod control system on January 31, 2018
: (1) Unit 1 rod control system on January 31, 2018
: (2) Unit 2 service water system on March 6, 2018
: (2) Unit 2 service water system on March 6, 2018
: (3) Internal and external flood seals on March 16, 2018
: (3) Internal and external flood seals on March 16, 2018  


===Quality Control (1 Sample)===
===Quality Control (1 Sample)===
Line 181: Line 215:
: (4) Unit 1 temporary reactor vessel level indication due valve, RC-1, repair on March 28, 2018
: (4) Unit 1 temporary reactor vessel level indication due valve, RC-1, repair on March 28, 2018


==71111.20 - Refueling and Other Outage Activities (Partial Sample)
==71111.20 - Refueling and Other Outage Activities (Partial Sample)==
The inspectors evaluated Unit 1 Refueling Outage 1R27 activities from March 24, 2018, to March 31, 2018. The inspectors completed inspection procedure Sections 03.01.a and 03.01.c.
The inspectors evaluated Unit 1 Refueling Outage 1R27 activities from March 24, 2018, to March 31, 2018. The inspectors completed inspection procedure Sections 03.01.a and 03.01.c.


==71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests:   Routine====
==71111.22 - Surveillance Testing==
The inspectors evaluated the following surveillance tests:  


{{IP sample|IP=IP 71111.20|count=3}}
===Routine===
{{IP sample|IP=IP 71111.22|count=3}}
: (1) Unit 1 emergency feedwater solenoid operated control valve, CV-2646, establishment of stroke time reference value and acceptance criteria on January 25, 2018
: (1) Unit 1 emergency feedwater solenoid operated control valve, CV-2646, establishment of stroke time reference value and acceptance criteria on January 25, 2018
: (2) Unit 1 and Unit 2 verified correct breaker alignment and indicated power availability for the 161 kV offsite circuited with the 500 kV offsite inoperable during autotransformer insulator repair on February 2, 2018
: (2) Unit 1 and Unit 2 verified correct breaker alignment and indicated power availability for the 161 kV offsite circuited with the 500 kV offsite inoperable during autotransformer insulator repair on February 2, 2018
: (3) Unit 1 train A reactor protection system and rod control system ac breaker surveillance trip testing on February 27, 2018
: (3) Unit 1 train A reactor protection system and rod control system ac breaker surveillance trip testing on February 27, 2018  


===In-service (1 Sample)===
===In-service (1 Sample)===
: (1) Unit 2 service water motor operated valve, 2CV-1435-1, service water inlet to train A       shutdown heat exchanger on March 15, 2018
: (1) Unit 2 service water motor operated valve, 2CV-1435-1, service water inlet to train A shutdown heat exchanger on March 15, 2018  


===Reactor Coolant System Leak Detection (1 Sample)===
===Reactor Coolant System Leak Detection (1 Sample)===
Line 198: Line 234:


==RADIATION SAFETY==
==RADIATION SAFETY==
==71124.01 - Radiological Hazard Assessment and Exposure Controls   Radiological Hazard Assessment==
==71124.01 - Radiological Hazard Assessment and Exposure Controls==
{{IP sample|IP=IP 71124.01|count=1}}
===Radiological Hazard Assessment (1 Sample)===
 
The inspectors evaluated radiological hazards assessments and controls.
===The inspectors evaluated radiological hazards assessments and controls.
Instructions to Workers===
{{IP sample|IP=IP 71124.01|count=1}}


===Instructions to Workers (1 Sample)===
The inspectors evaluated worker instructions.
The inspectors evaluated worker instructions.


Line 213: Line 247:
The inspectors evaluated radiological hazards control and work coverage.
The inspectors evaluated radiological hazards control and work coverage.


High Radiation Area and Very High Radiation Area Controls (1 Sample)
===High Radiation Area and Very High Radiation Area Controls (1 Sample)===
The inspectors evaluated risk-significant high radiation area and very high radiation area controls.
The inspectors evaluated risk-significant high radiation area and very high radiation area controls.


Line 219: Line 253:
The inspectors evaluated radiation worker performance and radiation protection technician proficiency.
The inspectors evaluated radiation worker performance and radiation protection technician proficiency.


==71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls   Implementation of ALARA and Radiological Work Controls==
==71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls==
{{IP sample|IP=IP 71124.02|count=1}}
===Implementation of ALARA and Radiological Work Controls (1 Sample)===
 
The inspectors reviewed ALARA practices and radiological work controls by reviewing the following activities and/or work packages:
The inspectors reviewed ALARA practices and radiological work controls by reviewing the following activities and/or work packages:
: (1) 2017-1070, core bore National Fire Protection Association (NFPA) 805 project and support activities
: (1) 2017-1070, core bore National Fire Protection Association (NFPA) 805 project and support activities
Line 227: Line 260:
: (3) 2018-1420, scaffold installation/removal non-Locked High Radiation Areas - 1R27
: (3) 2018-1420, scaffold installation/removal non-Locked High Radiation Areas - 1R27
: (4) 2018-1430, reactor disassembly, reassembly, and support activities
: (4) 2018-1430, reactor disassembly, reassembly, and support activities
: (5) 2018-1900, emergent maintenance activities during 1R27
: (5) 2018-1900, emergent maintenance activities during 1R27  


===Radiation Worker Performance (1 Sample)===
===Radiation Worker Performance (1 Sample)===
Line 233: Line 266:


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:


===71151 - Performance Indicator Verification    The inspectors verified licensee performance indicators submittals listed below:
===
  ===
{{IP sample|IP=IP 71151|count=8}}
{{IP sample|IP=IP 71151|count=8}}
: (1) IE01: Unplanned Scrams per 7000 Critical Hours Sample, Unit 1 and Unit 2, (January 1, 2017, through December 31, 2017)
: (1) IE01: Unplanned Scrams per 7000 Critical Hours Sample, Unit 1 and Unit 2, (January 1, 2017, through December 31, 2017)
Line 243: Line 276:
: (5) PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual (RETS/ODCM) Radiological Effluent Occurrences Sample (April 1, 2017, through March 30, 2018)
: (5) PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual (RETS/ODCM) Radiological Effluent Occurrences Sample (April 1, 2017, through March 30, 2018)


==71152 - Problem Identification and Resolution   Annual Follow-up of Selected Issues==
==71152 - Problem Identification and Resolution==
{{IP sample|IP=IP 71152|count=1}}
===Annual Follow-up of Selected Issues (1 Sample)===
 
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
: (1) Unit 2 train B service water inoperable due to strainer high differential pressure during pre-screen cleaning following winter shad run on March 27, 2018 A finding associated with this inspection is documented in the Inspection Results section below.
: (1) Unit 2 train B service water inoperable due to strainer high differential pressure during pre-screen cleaning following winter shad run on March 27, 2018 A finding associated with this inspection is documented in the Inspection Results section below.


===71153 - Follow-up of Events and Notices of Enforcement Discretion   Events ===
===71153 - Follow-up of Events and Notices of Enforcement Discretion Events===
{{IP sample|IP=IP 71153|count=2}}
{{IP sample|IP=IP 71153|count=2}}
: (1) The inspectors evaluated licensees response to Unit 2 entry into loss of service water abnormal operating procedure due to service water pump A and C strainer high differential pressure alarm during pre-screen cleaning on January 19, 2018.
: (1) The inspectors evaluated licensees response to Unit 2 entry into loss of service water abnormal operating procedure due to service water pump A and C strainer high differential pressure alarm during pre-screen cleaning on January 19, 2018.
Line 278: Line 310:


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Failure to Establish Adequate Criteria for Flood Seal Testing Cornerstone           Significance                               Cross-cutting     Report Aspect            Section Mitigating             Green                                      [H.1] -
Failure to Establish Adequate Criteria for Flood Seal Testing Cornerstone Significance Cross-cutting Aspect Report Section Mitigating Systems


==71111.01 - Systems                NCV 05000313/2018001-01 and                 Resources         External
Green NCV 05000313/2018001-01 and 05000368/2018001-01 Closed
      ==
[H.1] -
05000368/2018001-01                                          Flooding Closed The inspectors identified a Green finding and associated non-cited violation of Unit 1 Technical Specification 5.4.1.a and Unit 2 Technical Specification 6.4.1.a for the licensees failure to establish the criteria for ensuring the necessary conditions existed for a successful test of hatch flood seals. Specifically, Procedure OP 1402.240, Inspection of Watertight Hatches, Revision 01, did not contain adequate guidance to ensure that the auxiliary building was at a lower pressure than the turbine building such that puffing smoke on the turbine building side would allow a seal leak to be detectable.
Resources
 
==71111.01 - External==
Flooding The inspectors identified a Green finding and associated non-cited violation of Unit 1 Technical Specification 5.4.1.a and Unit 2 Technical Specification 6.4.1.a for the licensees failure to establish the criteria for ensuring the necessary conditions existed for a successful test of hatch flood seals. Specifically, Procedure OP 1402.240, Inspection of Watertight Hatches, Revision 01, did not contain adequate guidance to ensure that the auxiliary building was at a lower pressure than the turbine building such that puffing smoke on the turbine building side would allow a seal leak to be detectable.


=====Description:=====
=====Description:=====
Line 295: Line 330:
Corrective Action(s): The corrective action was to make changes to the procedure to establish appropriate ventilation lineup and re-perform the smoke tests at all locations.
Corrective Action(s): The corrective action was to make changes to the procedure to establish appropriate ventilation lineup and re-perform the smoke tests at all locations.


Corrective Action Reference(s): Condition Report CR-ANO-C-2017-04759
Corrective Action Reference(s): Condition Report CR-ANO-C-2017-04759  


=====Performance Assessment:=====
=====Performance Assessment:=====
Line 313: Line 348:
Disposition: This violation is being treated as a non-cited violation, consistent with Section 2.3.2.a of the Enforcement Policy, because it was very low safety significance (Green) and was entered into the licensees corrective action program as Condition Report CR-ANO-C-2017-04759.
Disposition: This violation is being treated as a non-cited violation, consistent with Section 2.3.2.a of the Enforcement Policy, because it was very low safety significance (Green) and was entered into the licensees corrective action program as Condition Report CR-ANO-C-2017-04759.


Failure to Preplan and Perform Service Water Pre-Screen Maintenance Cornerstone           Significance                               Cross-cutting     Report Aspect            Section Mitigating             Green                                     [H.12] - Avoid
Failure to Preplan and Perform Service Water Pre-Screen Maintenance Cornerstone Significance Cross-cutting Aspect Report Section Mitigating Systems Green NCV 05000368/2018001-02 Closed
[H.12] - Avoid Complacency


==71152 - Systems                NCV 05000368/2018001-02                    Complacency      Annual           ==
==71152 - Annual==
Closed                                                      Follow-up of Selected Issues The inspectors reviewed a self-revealed, non-cited violation and associated finding of Arkansas Nuclear One, Unit 2, Technical Specification 6.4.1.a, for the licensees failure to properly preplan maintenance that can affect the performance of safety-related equipment.
Follow-up of Selected Issues The inspectors reviewed a self-revealed, non-cited violation and associated finding of Arkansas Nuclear One, Unit 2, Technical Specification 6.4.1.a, for the licensees failure to properly preplan maintenance that can affect the performance of safety-related equipment.


Specifically, the licensee failed to properly preplan pre-screen cleaning maintenance, causing the train B service water system to become inoperable.
Specifically, the licensee failed to properly preplan pre-screen cleaning maintenance, causing the train B service water system to become inoperable.
Line 341: Line 377:
Corrective Action(s): The immediate corrective action was to restore operability of the train B service water system and institute a weekly pre-screen cleaning regiment.
Corrective Action(s): The immediate corrective action was to restore operability of the train B service water system and institute a weekly pre-screen cleaning regiment.


Corrective Action Reference(s): Condition Report CR-ANO-C-2018-00299
Corrective Action Reference(s): Condition Report CR-ANO-C-2018-00299  


=====Performance Assessment:=====
=====Performance Assessment:=====
Line 361: Line 397:
Licensee Identified Non-Cited Violation
Licensee Identified Non-Cited Violation


==71124.01 - Radiological Hazard                                                                               ==
==71124.01 - Radiological Hazard==
Assessment and Exposure Controls This violation of very low safety significant (Green) was identified by the licensee and has been entered into the licensee corrective action program and is being treated as a non-cited violation, consistent with Section 2.3.2.a of the Enforcement Policy.
Assessment and Exposure Controls This violation of very low safety significant (Green) was identified by the licensee and has been entered into the licensee corrective action program and is being treated as a non-cited violation, consistent with Section 2.3.2.a of the Enforcement Policy.


Line 374: Line 410:
: (4) the ability to assess dose was not compromised.
: (4) the ability to assess dose was not compromised.


Corrective Action Reference(s): CR-ANO-2-2017-04634 and CR-ANO-2-2017-05337 Unresolved Item       Validation of the ANO data collected during the thermal       60855.1 (Closed)                validation test and used in the Holtec analysis.
Corrective Action Reference(s): CR-ANO-2-2017-04634 and CR-ANO-2-2017-05337  
 
Unresolved Item (Closed)
Validation of the ANO data collected during the thermal validation test and used in the Holtec analysis.


URI 7200013/2012001-02
URI 7200013/2012001-02 60855.1


=====Description:=====
=====Description:=====
Line 387: Line 426:
ANO took corrective actions to verify that the data from the measuring instruments was acceptable by sending the equipment to a qualified lab to verify the equipment was properly calibrated. ANO was able to verify the calibration of the resistance temperature detectors used in the test. The other equipment used in the test were DANTEC LVFA wind tunnel 435-1010 anemometer probes which measured air velocities at very low rates of speed. ANO sent these anemometers to multiple labs including Exelon Labs and National Aeronautics and Space Administration (NASA) for calibration. Unfortunately, none of the labs were able to successfully test the equipment to verify they were properly calibrated, and upon return to ANO, the anemometers were broken in transit. ANO was unable to verify the validity of the data collected during their thermal validation test.
ANO took corrective actions to verify that the data from the measuring instruments was acceptable by sending the equipment to a qualified lab to verify the equipment was properly calibrated. ANO was able to verify the calibration of the resistance temperature detectors used in the test. The other equipment used in the test were DANTEC LVFA wind tunnel 435-1010 anemometer probes which measured air velocities at very low rates of speed. ANO sent these anemometers to multiple labs including Exelon Labs and National Aeronautics and Space Administration (NASA) for calibration. Unfortunately, none of the labs were able to successfully test the equipment to verify they were properly calibrated, and upon return to ANO, the anemometers were broken in transit. ANO was unable to verify the validity of the data collected during their thermal validation test.


Corrective Action Reference(s): CR-ANO-C-2013-00374, CR-ANO-C-2013-0575, and CR-ANO-C-2013-00576 Closure Basis: Since the ANO staff were unable to validate the data collected for the thermal validation test, as required by CoC License Condition 9, the required test will still need to be performed. However, the NRC has concluded that the wording from CoC License Condition 9 (Amendments 5-9) was not suitable to provide adequate test data to confirm the Holtec thermal analysis as described in the FSAR. The License Condition 9 required measuring air velocity within the annulus area between the canister and the overpack. The data provided in the ANO test was inconsistent and the test requirements listed in the CoC Amendments 5 through 9, License Condition 9, needed to be revised to provide more consistent data that could be utilized by the vendor and the NRC to verify the analytical models from the FSAR.
Corrective Action Reference(s): CR-ANO-C-2013-00374, CR-ANO-C-2013-0575, and CR-ANO-C-2013-00576  
 
Closure Basis: Since the ANO staff were unable to validate the data collected for the thermal validation test, as required by CoC License Condition 9, the required test will still need to be performed. However, the NRC has concluded that the wording from CoC License Condition 9 (Amendments 5-9) was not suitable to provide adequate test data to confirm the Holtec thermal analysis as described in the FSAR. The License Condition 9 required measuring air velocity within the annulus area between the canister and the overpack. The data provided in the ANO test was inconsistent and the test requirements listed in the CoC Amendments 5 through 9, License Condition 9, needed to be revised to provide more consistent data that could be utilized by the vendor and the NRC to verify the analytical models from the FSAR.


On May 31, 2016, NRC issued CoC 1014, License Amendment 10, (ADAMS Accession No. ML17237B994) which modified the License Condition 9 thermal validation test to measure air velocity at the inlet vents and not the annulus area between the canister and the overpack.
On May 31, 2016, NRC issued CoC 1014, License Amendment 10, (ADAMS Accession No. ML17237B994) which modified the License Condition 9 thermal validation test to measure air velocity at the inlet vents and not the annulus area between the canister and the overpack.
Line 393: Line 434:
The first general licensee to load a canister that exceeds 20 kW, under CoC 1014 License Amendment 10, is required to perform the thermal validation test using the new method as described in the license condition. This test will provide sufficient data for the vendor to perform the required analysis and allow the NRC more stable results to review and conclude on the validation of the thermal model as described in the FSAR. A licensee in another region has described their intention of performing the required thermal validation test in the 2018 timeframe.
The first general licensee to load a canister that exceeds 20 kW, under CoC 1014 License Amendment 10, is required to perform the thermal validation test using the new method as described in the license condition. This test will provide sufficient data for the vendor to perform the required analysis and allow the NRC more stable results to review and conclude on the validation of the thermal model as described in the FSAR. A licensee in another region has described their intention of performing the required thermal validation test in the 2018 timeframe.


Unresolved Item       Applicability of the ANO thermal validation test results to     60855.1 (Closed)                other HI-STORM 100 overpack configurations.
Unresolved Item (Closed)
Applicability of the ANO thermal validation test results to other HI-STORM 100 overpack configurations.


URI 07200013/2012001-03
URI 07200013/2012001-03 60855.1


=====Description:=====
=====Description:=====
Line 421: Line 463:
71111.01 - Adverse Weather Protection
71111.01 - Adverse Weather Protection
Miscellaneous Documents
Miscellaneous Documents
Number           Title                                                   Revision
Number
M-2204           Piping & Instrument Diagram, Emergency Feedwater,       72
Title
Sheet 4
Revision
M-2204
Piping & Instrument Diagram, Emergency Feedwater,
Sheet 4  
 
Procedures
Procedures
Number           Title                                                   Revision
Number
2104.036         Emergency Diesel Generator Operations                   94
Title
2106.006         Emergency Feedwater System Operations                   97
Revision
2106.032         Unit Two Freeze Protection Guide                         27
2104.036
1402.240         Inspection of Watertight Hatches                         2
Emergency Diesel Generator Operations
2106.006
Emergency Feedwater System Operations
2106.032
Unit Two Freeze Protection Guide
1402.240
Inspection of Watertight Hatches  
 
Condition Reports (CR-ANO-)
Condition Reports (CR-ANO-)
C-2018-00050           1-2017-03673
C-2018-00050
1-2017-03673  
 
71111.04 - Equipment Alignment
71111.04 - Equipment Alignment
Miscellaneous Documents
Miscellaneous Documents
Number           Title                                                   Revision
Number
CALC-91-E-       ANO-2 EDG Room Ventilation                              2
Title
Revision
CALC-91-E-
0090-02
0090-02
CALC-91-R-                                                                 28
ANO-2 EDG Room Ventilation
2013-01
CALC-91-R-
EC-24964         U-2 Emergency Diesel Generator Cycle 20 Heat Exchanger
2013-01  
 
EC-24964
U-2 Emergency Diesel Generator Cycle 20 Heat Exchanger
Thermal Performance Evaluation
Thermal Performance Evaluation
EC-45962         2K-4A/B 2013 Emergency Diesel Heat Exchanger Thermal
EC-45962
2K-4A/B 2013 Emergency Diesel Heat Exchanger Thermal
Performance Test
Performance Test
EC-46332         U-2 Emergency Diesel Generator Thermal Performance
EC-46332
U-2 Emergency Diesel Generator Thermal Performance
Test Review 2011
Test Review 2011
EC-52442         2014 2K-4A/B Thermal Performance Evaluation
EC-52442
EC-66265         U-2 SW Strainer D/P Spike Op Input                       0
2014 2K-4A/B Thermal Performance Evaluation
EC-66265
U-2 SW Strainer D/P Spike Op Input
ER-ANO-2006-
ER-ANO-2006-
248-000
248-000  
GL-89-13         SW System Problems Affecting Safety-Related Equipment
 
GL-89-13
SW System Problems Affecting Safety-Related Equipment  
 
Miscellaneous Documents
Miscellaneous Documents
Number           Title                                                       Revision
Number
M-2204           Piping & Instrument Diagram, Emergency Feedwater,           72
Title
Revision
M-2204
Piping & Instrument Diagram, Emergency Feedwater,
Sheet 4
Sheet 4
M-2210           Piping & Instrument Diagram, Service Water, Sheet 1 - 4     83
M-2210
STM-2-42         SW and ACW Systems                                         38
Piping & Instrument Diagram, Service Water, Sheet 1 - 4
STM-2-42
SW and ACW Systems  
 
Procedures
Procedures
Number           Title                                                       Revision
Number
1403.191         Motor Testing Using MCE/EMAX                             11, 12
Title
2104.029         Service Water System Operations                             109
Revision
2104.036         Emergency Diesel Generator Operations                       94
1403.191
2104.044         Ventilation System Operations                               44
Motor Testing Using MCE/EMAX
2106.006         Emergency Feedwater System Operations                       97
11, 12
2104.029
Service Water System Operations
109
2104.036
Emergency Diesel Generator Operations
2104.044
Ventilation System Operations
2106.006
Emergency Feedwater System Operations  
 
Condition Reports (CR-ANO-)
Condition Reports (CR-ANO-)
1-2013-03239           1-2016-05663             1-2016-05675         1-2016-05676
1-2013-03239
1-2017-00186           1-2018-00132             2-2012-00762         2-2015-02748
1-2016-05663
2-2015-02879           2-2015-05329             2-2016-00035         2-2016-00550
1-2016-05675
2-2016-02987           2-2016-03206             2-2016-03918         2-2016-04462
1-2016-05676
2-2017-05291           2-2017-05919             2-2018-00157         2-2018-00165
1-2017-00186
2-2018-00168           C-2013-03165             C-2016-05226         C-2016-05445
1-2018-00132
C-2017-04059           C-2017-04069             C-2017-04775         C-2018-00277
2-2012-00762
C-2018-00441
2-2015-02748
2-2015-02879
2-2015-05329
2-2016-00035
2-2016-00550
2-2016-02987
2-2016-03206
2-2016-03918
2-2016-04462
2-2017-05291
2-2017-05919
2-2018-00157
2-2018-00165
2-2018-00168
C-2013-03165
C-2016-05226
C-2016-05445
C-2017-04059
C-2017-04069
C-2017-04775
C-2018-00277
C-2018-00441  
 
Work Orders
Work Orders
2537116           52728726            497922-01
2537116
2728726
497922-01  
 
71111.05 - Fire Protection
71111.05 - Fire Protection
Miscellaneous Documents
Miscellaneous Documents
Number           Title                                                       Revision/Date
Number
Pre-Drill Brief - ASOTH-FP-FBDRLS                           9
Title
EC-52999         Justification for Additional Non-Q Battery Room Heating     00
Revision/Date
Pre-Drill Brief - ASOTH-FP-FBDRLS
EC-52999
Justification for Additional Non-Q Battery Room Heating  
 
Miscellaneous Documents
Miscellaneous Documents
Number           Title                                                 Revision/Date
Number
ER-ANO-2002-     Justification for Temporary Non-Q Battery Room Heating January 30,
Title
0145-00                                                                2002
Revision/Date
FBDRL-2018-03   Fire Drill                                             March 9,
ER-ANO-2002-
0145-00
Justification for Temporary Non-Q Battery Room Heating
January 30,
2002
FBDRL-2018-03
Fire Drill
March 9,
2018
2018
Procedures
Procedures
Number           Title                                                 Revision
Number
2106.032         Unit Two Freeze Protection Guide                       27
Title
Revision
2106.032
Unit Two Freeze Protection Guide  
 
71111.06 - Flood Protection Measures
71111.06 - Flood Protection Measures
Drawings
Drawings
Number           Title                                                 Revision
Number
E-601           Electrical Plot Plan Outdoor Area, Sheet 1
Title
1402.240         Inspection of Watertight Hatches                       2
Revision
E-601
Electrical Plot Plan Outdoor Area, Sheet 1
1402.240
Inspection of Watertight Hatches  
 
Work Orders
Work Orders
2747174
2747174  
 
71111.11 - Licensed Operator Requalification Program and Licensed Operator
71111.11 - Licensed Operator Requalification Program and Licensed Operator
Performance
Performance
Procedures
Procedures
Number           Title                                                 Revision
Number
OP-2202.001     Standard Post Trip Actions                             16
Title
OP-2202.002     Reactor Trip Recovery                                 11
Revision
OP-2203.009     Fire Protection System Annunciator Corrective Actions 32
OP-2202.001
OP-2203.025     RCP Emergencies                                       18
Standard Post Trip Actions
OP-2203.034     Fire or Explosion                                     21
OP-2202.002
Reactor Trip Recovery
OP-2203.009
Fire Protection System Annunciator Corrective Actions
OP-2203.025
RCP Emergencies
OP-2203.034
Fire or Explosion  
 
71111.12 - Maintenance Effectiveness
71111.12 - Maintenance Effectiveness
Drawings
Drawings
Number           Title
Number
234C7880F       Induction Motor
Title
234C7880F
Induction Motor  
 
Miscellaneous Documents
Miscellaneous Documents
Number           Title                                               Revision
Number
117               Engineering Evaluation, SW Pumps                     6
Title
2015             U-2 SW System Health Report Q1, Q2, Q3, Q4
Revision
2016             U-2 SW System Health Report Q1, Q2, Q4
117
2017             U-2 SW System Health Report Q2
Engineering Evaluation, SW Pumps
EC-28463         SW System                                           0
2015
N 1000.006-P     E-Doc, SW System Ops                                 53
U-2 SW System Health Report Q1, Q2, Q3, Q4
TDG080 1710       Triclad Vertical Induction Motors                   3
2016
U-2 SW System Health Report Q1, Q2, Q4
2017
U-2 SW System Health Report Q2
EC-28463
SW System
N 1000.006-P
E-Doc, SW System Ops
TDG080 1710
Triclad Vertical Induction Motors  
 
Procedures
Procedures
Number           Title                                               Revision
Number
1304.125         Unit 1 RPS-A/CRD Breaker Trip Test                   26
Title
1309.013         Flow Rate Data
Revision
2104.029         SW System Ops                                       109
1304.125
203.022         Loss of SW Tech Guidelines                           14
Unit 1 RPS-A/CRD Breaker Trip Test
2311.002         Flow Rate Data
1309.013
2411.102         U-2 Slide Gate and SW Bay Cleaning/Inspection
Flow Rate Data
EN-DC-204         Maintenance Rule Scope and Basis                     4
2104.029
EN-DC-205         Maintenance Rule Monitoring                         6
SW System Ops
EN-FAP-OM-012 Prompt Investigation and Notifications, Attn. 7.4       9
109
EN-LI-118         ANO Response to Cold Weather Shad Runs               25
203.022
1402.240         Inspection of Watertight Hatches                     2
Loss of SW Tech Guidelines
2311.002
Flow Rate Data
2411.102
U-2 Slide Gate and SW Bay Cleaning/Inspection
EN-DC-204
Maintenance Rule Scope and Basis
EN-DC-205
Maintenance Rule Monitoring
EN-FAP-OM-012 Prompt Investigation and Notifications, Attn. 7.4
EN-LI-118
ANO Response to Cold Weather Shad Runs
1402.240
Inspection of Watertight Hatches  
 
Condition Reports (CR-ANO-)
Condition Reports (CR-ANO-)
1-2017-00965           2-2014-02814             2-2015-00083   2-2015-00129
1-2017-00965
2-2015-00268           2-2016-01808             2-2016-02351   2-2016-02611
2-2014-02814
2-2017-01162           2-2017-05280             2-2017-05281   2-2017-05329
2-2015-00083
2-2017-05759           2-2018-00044             2-2018-00045   2-2018-00157
2-2015-00129
2-2018-00300           2-2018-00445             2-2018-00797   C-2017-00287
2-2015-00268
C-2018-00299           C-2018-01623             1-2017-03673
2-2016-01808
2-2016-02351
2-2016-02611
2-2017-01162
2-2017-05280
2-2017-05281
2-2017-05329
2-2017-05759
2-2018-00044
2-2018-00045
2-2018-00157
2-2018-00300
2-2018-00445
2-2018-00797
C-2017-00287
C-2018-00299
C-2018-01623
1-2017-03673  
 
Work Orders
Work Orders
189034             435369           453805           468095         486027
189034
489032             51803722         52652306        52711156        52713201
435369
2715932           52728009          52766896        52784316
453805
468095
486027
489032
51803722
2652306
2711156
2713201
2715932
2728009
2766896
2784316
 
71111.13 - Maintenance Risk Assessments and Emergent Work Control
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Miscellaneous Documents
Miscellaneous Documents
Number           Title                                                 Revision
Number
COPD-024         Risk Assessment Actions                               64
Title
Revision
COPD-024
Risk Assessment Actions  
 
Procedures
Procedures
Number           Title                                                 Revision
Number
1107.001         Electrical System Operations                           115
Title
2104.029         Service Water System Operations                       109
Revision
203.003         CEA Malfunction                                       24
1107.001
EN-FAP-OM-021 Critical Decision Procedure                               5
Electrical System Operations
EN-OP-119         Protected Equipment Postings                           9
115
EN-WM-104         On Line Risk Assessment                               16
2104.029
Service Water System Operations
109
203.003
CEA Malfunction
EN-FAP-OM-021 Critical Decision Procedure
EN-OP-119
Protected Equipment Postings
EN-WM-104
On Line Risk Assessment  
 
Condition Reports (CR-ANO-)
Condition Reports (CR-ANO-)
C-2018-00474           C-2018-00475
C-2018-00474
C-2018-00475  
 
Work Orders
Work Orders
490410
490410  
 
71111.15 - Operability Determinations and Functionality Assessments
71111.15 - Operability Determinations and Functionality Assessments
Drawings
Drawings
Number           Title
Number
A2001S01         ANO 500/161KV SW STA Station One-Line In-Service
Title
A2001S01
ANO 500/161KV SW STA Station One-Line In-Service
Diagram
Diagram
E-2100           Schematic Diagram Diesel Generator 2K4A ACB 152-308
E-2100
E-2276           Schematic Diagram Service Water Pump 2P4B
Schematic Diagram Diesel Generator 2K4A ACB 152-308
E-2361           Schematic Diagram Containment Cooling 2VSF1A
E-2276
E-2361           Schematic Diagram Containment Cooling 2VSF1B
Schematic Diagram Service Water Pump 2P4B
E-2361
Schematic Diagram Containment Cooling 2VSF1A
E-2361
Schematic Diagram Containment Cooling 2VSF1B  
 
Miscellaneous Documents
Miscellaneous Documents
Number           Title                                                       Date
Number
00-R-2011-01     Calculation
Title
OPS-152A         SU1 Outage Checklist - Unit 1 - 72-Hour TC                 August 29,
Date
00-R-2011-01
Calculation
OPS-152A
SU1 Outage Checklist - Unit 1 - 72-Hour TC
August 29,
2013
2013
OPS-152B         SU3 Outage Checklist - Unit 2 - 72-Hour TC                 August 29,
OPS-152B
SU3 Outage Checklist - Unit 2 - 72-Hour TC
August 29,
2013
2013
Procedures
Procedures
Number           Title                                                       Revision
Number
1106.006         Emergency Feedwater Pump Operation                         100, 101, 102
Title
Revision
1106.006
Emergency Feedwater Pump Operation
100, 101, 102
Condition Reports (CR-ANO-)
Condition Reports (CR-ANO-)
1-2000-00068           1-2017-01820             1-2018-00086         2-2000-00074
1-2000-00068
2-2018-00055           2-2018-00065             2-2018-00088         C-2018-00389
1-2017-01820
C-2018-00474           C-2018-00475
1-2018-00086
2-2000-00074
2-2018-00055
2-2018-00065
2-2018-00088
C-2018-00389
C-2018-00474
C-2018-00475  
 
Work Orders
Work Orders
490410-16
490410-16  
 
71111.18 - Plant Modifications
71111.18 - Plant Modifications
Miscellaneous Documents
Miscellaneous Documents
Number           Title                                                       Revision/Date
Number
CALC-86E-0020- 1E Station Battery 2D11 Duty Cycle and Sizing Calculation     18
Title
EC-52999         Justification for Additional Non-Q Battery Room Heating     00
Revision/Date
ER-ANO-2002-     Justification for Temporary Non-Q Battery Room Heating     January 30,
CALC-86E-0020-
0145-00                                                                      2002
1E Station Battery 2D11 Duty Cycle and Sizing Calculation
STM 2-32-5       125 VDC Electrical Distribution                             25
EC-52999
Justification for Additional Non-Q Battery Room Heating
ER-ANO-2002-
0145-00
Justification for Temporary Non-Q Battery Room Heating
January 30,
2002
STM 2-32-5
25 VDC Electrical Distribution  
 
Procedures
Procedures
Number           Title                                                       Revision
Number
2106.032         Unit Two Freeze Protection Guide                           27
Title
Revision
2106.032
Unit Two Freeze Protection Guide  
 
Condition Reports (CR-ANO-)
Condition Reports (CR-ANO-)
2-2003-00041           2-2014-00345
2-2003-00041
2-2014-00345  
 
Work Orders
Work Orders
490646
490646  
 
71111.19 - Post-Maintenance Testing
71111.19 - Post-Maintenance Testing
Procedures
Procedures
Number           Title                                     Revision
Number
2304.237         Post Maintenance Verification             16
Title
Revision
2304.237
Post Maintenance Verification  
 
Condition Reports (CR-ANO-)
Condition Reports (CR-ANO-)
1-2018-01107           2-2018-00356
1-2018-01107
2-2018-00356  
 
Work Orders
Work Orders
494916
494916  
 
71111.22 - Surveillance Testing
71111.22 - Surveillance Testing
Miscellaneous Documents
Miscellaneous Documents
Number           Title                                     Revision/Date
Number
Title
Revision/Date
CALC-95-R-
CALC-95-R-
0014-02-01
0014-02-01  
MWO50235000
 
MWO50235239
MWO50235000  
MWO50235641
 
OPS-152A         SU1 Outage Checklist - Unit 1 - 72-Hour TC August 29,
MWO50235239  
 
MWO50235641  
 
OPS-152A
SU1 Outage Checklist - Unit 1 - 72-Hour TC
August 29,
2013
2013
OPS-152B         SU3 Outage Checklist - Unit 2 - 72-Hour TC August 29,
OPS-152B
SU3 Outage Checklist - Unit 2 - 72-Hour TC
August 29,
2013
2013
SEP-ANO-1-       ANO-1 Inservice Testing Basis Document    3
SEP-ANO-1-
IST-1
IST-1
ANO-1 Inservice Testing Basis Document
Procedures
Procedures
Number           Title                                     Revision
Number
1104.209         SW Pump Performance Curves
Title
Revision
1104.209
SW Pump Performance Curves  
 
Procedures
Procedures
Number           Title                                                   Revision
Number
1106.006         Emergency Feedwater Pump Operation                     100, 101, 102
Title
1107.001A         Unit 1 XFMR Outage Checklist                           115
Revision
1304.125         Unit 1 RPS-A/CRD Breaker Trip Test                     26
1106.006
2104.029         SW Pump Performance Curves
Emergency Feedwater Pump Operation
100, 101, 102
1107.001A
Unit 1 XFMR Outage Checklist
115
1304.125
Unit 1 RPS-A/CRD Breaker Trip Test
2104.029
SW Pump Performance Curves  
 
Condition Reports (CR-ANO-)
Condition Reports (CR-ANO-)
1-2009-01820           1-2017-00965         1-2018-00086         1-2018-00631
1-2009-01820
2-2017-05885           C-2018-00474
1-2017-00965
1-2018-00086
1-2018-00631
2-2017-05885
C-2018-00474  
 
Work Orders
Work Orders
2747144
2747144  
 
71124.01 - Radiological Hazard Assessment and Exposure Controls
71124.01 - Radiological Hazard Assessment and Exposure Controls
Air Sample Surveys
Air Sample Surveys
Number           Title                                                   Date
Number
AS-ANO-2018-     RAB 10 - P36 A Makeup Pump Tear Down                   March 2,
Title
04648                                                                    2018
Date
AS-ANO-2018-     RAB 11 - AMS-4 Alarm                                   March 7,
AS-ANO-2018-
04660                                                                    2018
04648
AS-ANO-2018-     RAB 121 - Replace 2RE - 8221-2 Blower Pump UNPR         March 9,
RAB 10 - P36 A Makeup Pump Tear Down
04665                                                                    2018
March 2,
2018
AS-ANO-2018-
04660
RAB 11 - AMS-4 Alarm
March 7,
2018
AS-ANO-2018-
04665
RAB 121 - Replace 2RE - 8221-2 Blower Pump UNPR
March 9,
2018
Audits and Self-Assessments
Audits and Self-Assessments
Number           Title                                                   Date
Number
LO-ALO-2017-     Self-Assessment: Radiation Safety - Hazard Assessment   March 22,
Title
00025            and Airborne Controls                                  2017
Date
QA-14/15-2017-                                                           November 6,
LO-ALO-2017-
00025
Self-Assessment: Radiation Safety - Hazard Assessment
and Airborne Controls
March 22,
2017
QA-14/15-2017-
ANO-01
Combined Radiation Protection and Radwaste
Combined Radiation Protection and Radwaste
ANO-01                                                                    2017
November 6,
2017
Miscellaneous Documents
Miscellaneous Documents
Number           Title                                                   Date
Number
NSTS Annual Inventory Reconciliation Report             January 11,
Title
Date
NSTS Annual Inventory Reconciliation Report
January 11,
2018
2018
ANO Alpha Hazard Evaluation                             May 3, 2017
ANO Alpha Hazard Evaluation
May 3, 2017  
 
Miscellaneous Documents
Miscellaneous Documents
Number           Title                                                 Date
Number
ANO-2017-0067     Spent Fuel Pool Inventory - Non-Fuel Items           August 22,
Title
Date
ANO-2017-0067
Spent Fuel Pool Inventory - Non-Fuel Items
August 22,
2017
2017
ANO-2017-0093     2017 Radiation Energy Distribution Evaluation         December 7,
ANO-2017-0093
2017 Radiation Energy Distribution Evaluation
December 7,
2017
2017
2742701         Annual Inventory of Non-Installed Radioactive Sources February 20,
2742701
Annual Inventory of Non-Installed Radioactive Sources
February 20,
2018
2018
2745968         Semi Annual Leak Test of Sealed Sources               February 15,
2745968
Semi Annual Leak Test of Sealed Sources
February 15,
2018
2018
Procedures
Procedures
Number           Title                                                 Revision
Number
EN-RP-100         Radiation Worker Expectations                         12
Title
EN-RP-101         Access Control for Radiologically Controlled Areas   14
Revision
EN-RP-102         Radiological Control                                 5
EN-RP-100
EN-RP-104         Personnel Contamination Events                       10
Radiation Worker Expectations
EN-RP-105         Radiological Work Permits                             18
EN-RP-101
EN-RP-106         Radiological Survey Documentation                     7
Access Control for Radiologically Controlled Areas
EN-RP-108         Radiation Protection Posting                         20
EN-RP-102
EN-RP-109         Hot Spot Program                                     5
Radiological Control
EN-RP-121         Radioactive Material Control                         14
EN-RP-104
EN-RP-123         Radiological Controls for Highly Radioactive Objects 1
Personnel Contamination Events
EN-RP-143         Source Control                                       13
EN-RP-105
EN-RP-152         Conduct of Radiation Protection                       3
Radiological Work Permits
EN-RP-106
Radiological Survey Documentation
EN-RP-108
Radiation Protection Posting
EN-RP-109
Hot Spot Program
EN-RP-121
Radioactive Material Control
EN-RP-123
Radiological Controls for Highly Radioactive Objects
EN-RP-143
Source Control
EN-RP-152
Conduct of Radiation Protection  
 
Radiation Surveys
Radiation Surveys
Number           Title                                                 Date
Number
1609-0457         U1 AUX 335 EL - F3A/F3B Filter Rooms                 September
Title
Date
1609-0457
U1 AUX 335 EL - F3A/F3B Filter Rooms
September
19, 2016
19, 2016
1703-0336         U1 AUX Bldg - T-15 Tank Room                         March 14,
1703-0336
U1 AUX Bldg - T-15 Tank Room
March 14,
2017
2017
1801-0490         U1 AUX 335 EL F2 Seal Injection Filter Room         January 31,
1801-0490
2018
U1 AUX 335 EL F2 Seal Injection Filter Room
1802-0204        Semi Annual Source Leak Test                          February 14,
January 31,
2018
2018
1802-0204
Semi Annual Source Leak Test
February 14,
2018
Radiation Work Permits
Radiation Work Permits
Number           Title                                                     Revision
Number
20181401         Radiation Protection Activities During 1R27               00
Title
20181407         Decontamination Activities During !R27 (Bulk Work)         00
Revision
20181412         1R27 Locked High Radiation Area Activities (Bulk Work)     01
20181401
20181425         RCP Motor Maintenance During 1R27                         00
Radiation Protection Activities During 1R27
20181430         Reactor Disassembly/Re-Assembly, and Support Activities   00
20181407
20181432         De-Fuel & Re-Fuel the Reactor                             00
Decontamination Activities During !R27 (Bulk Work)
20182053         Spent Fuel Activities - Unit 2                             00
20181412
1R27 Locked High Radiation Area Activities (Bulk Work)
20181425
RCP Motor Maintenance During 1R27
20181430
Reactor Disassembly/Re-Assembly, and Support Activities
20181432
De-Fuel & Re-Fuel the Reactor
20182053
Spent Fuel Activities - Unit 2  
 
Condition Reports (CR-ANO-)
Condition Reports (CR-ANO-)
1-2018-00585           1-2018-00997             1-2018-01273         2-2017-01634
1-2018-00585
2-2017-04273           2-2017-04634             2-2017-05337         2-2017-06115
1-2018-00997
C-2017-00890           C-2017-00946             C-2017-01105         C-2017-03822
1-2018-01273
C-2017-03929           C-2018-01264
2-2017-01634
2-2017-04273
2-2017-04634
2-2017-05337
2-2017-06115
C-2017-00890
C-2017-00946
C-2017-01105
C-2017-03822
C-2017-03929
C-2018-01264  
 
Fleet Condition Reports (CR-HQN-)
Fleet Condition Reports (CR-HQN-)
2017-00179             2017-00848               2017-00974
2017-00179
2017-00848
2017-00974  
 
71124.02 - Occupational ALARA Planning and Controls
71124.02 - Occupational ALARA Planning and Controls
ALARA Planning, In-Progress Reviews, and Post-Job Reviews
ALARA Planning, In-Progress Reviews, and Post-Job Reviews
Number           Title                                                     Date
Number
20171070         Core Bore NFPA 805 Project and Support Activities         March 6,
Title
Date
20171070
Core Bore NFPA 805 Project and Support Activities
March 6,
2018
2018
20181070         Core Bore NFPA 805 Project and Support Activities         March 5,
20181070
Core Bore NFPA 805 Project and Support Activities
March 5,
2018
2018
20181430         Reactor Disassembly, Reassembly, and Support Activities   June 17,
20181430
Reactor Disassembly, Reassembly, and Support Activities
June 17,
2017
2017
Audits and Self-Assessments
Audits and Self-Assessments
Number           Title                                                     Date
Number
LO-ALO-2017-     Self-Assessment: Radiation Safety - ALARA & Dose           September
Title
00023            Assessment                                                11, 2017
Date
QA-14/15-2017-   Quality Assurance Audit: Combined Radiation Protection     November 6,
LO-ALO-2017-
ANO-01            and Radwaste                                              2017
00023
Self-Assessment: Radiation Safety - ALARA & Dose
Assessment
September
11, 2017
QA-14/15-2017-
ANO-01
Quality Assurance Audit: Combined Radiation Protection
and Radwaste
November 6,
2017  
 
Miscellaneous Documents
Miscellaneous Documents
Number           Title                                                   Date
Number
Letdown Heat Exchanger (E-29A/B) Flush Plan             March 28,
Title
Date
Letdown Heat Exchanger (E-29A/B) Flush Plan
March 28,
2018
2018
TSR 18-1-063     Letdown Heat Exchangers, E-29A and E-29B                 December 7,
TSR 18-1-063
Letdown Heat Exchangers, E-29A and E-29B
December 7,
2017
2017
TSR 18-1-064     RBD-11A & RBD-12A / Makeup System                       December 7,
TSR 18-1-064
RBD-11A & RBD-12A / Makeup System
December 7,
2017
2017
TSR 18-1-123     Letdown Cooler E-29A&B Inlet/Outlet Isolation           December 7,
TSR 18-1-123
Letdown Cooler E-29A&B Inlet/Outlet Isolation
December 7,
2017
2017
Procedures
Procedures
Number           Title                                                   Revision
Number
EN-RP-105         Radiological Work Permits                               18
Title
EN-RP-110         ALARA Program                                           14
Revision
EN-RP-110-03     Collective Radiation Exposure Guidelines                 4
EN-RP-105
EN-RP-110-04     Radiation Protection Risk Assessment Process             7
Radiological Work Permits
EN-RP-110-06     Outage Dose Estimating and Tracking                     1
EN-RP-110
ALARA Program
EN-RP-110-03
Collective Radiation Exposure Guidelines
EN-RP-110-04
Radiation Protection Risk Assessment Process
EN-RP-110-06
Outage Dose Estimating and Tracking  
 
Radiation Work Permits
Radiation Work Permits
Number           Title                                                   Revision
Number
20171070         Core Bore NFPA 805 Project and Support Activities       03
Title
20181070         Core Bore NFPA 805 Project and Support Activities       03
Revision
20181401         Radiation Protection Activities During 1R27             00
20171070
20181414         ALARA Activities During 1R27                             00
Core Bore NFPA 805 Project and Support Activities
20181420         Scaffold Installation / Removal Non-LHRAs - 1R27         00
20181070
20181430         Reactor Disassembly, Reassembly, and Support Activities 00
Core Bore NFPA 805 Project and Support Activities
20181900         Emergent Maintenance Activities During 1R27             00
20181401
Radiation Protection Activities During 1R27
20181414
ALARA Activities During 1R27
20181420
Scaffold Installation / Removal Non-LHRAs - 1R27
20181430
Reactor Disassembly, Reassembly, and Support Activities
20181900
Emergent Maintenance Activities During 1R27  
 
Condition Reports (CR-ANO-)
Condition Reports (CR-ANO-)
1-2018-00336           1-2018-00508             1-2018-00849       2-2017-05526
1-2018-00336
C-2017-04230           C-2017-04551             C-2017-04692       C-2018-00851
1-2018-00508
1-2018-00849
2-2017-05526
C-2017-04230
C-2017-04551
C-2017-04692
C-2018-00851  
 
Fleet Condition Reports (CR-HQN-)
Fleet Condition Reports (CR-HQN-)
2017-01791
2017-01791  
 
71151 - Performance Indicator Verification
71151 - Performance Indicator Verification
Procedures
Procedures
Number           Title                                                       Revision
Number
EN-LI-114         Regulatory Performance Indicator Process                   7, 8
Title
Revision
EN-LI-114
Regulatory Performance Indicator Process
7, 8
71152 - Problem Identification and Resolution
71152 - Problem Identification and Resolution
Miscellaneous Documents
Miscellaneous Documents
Number           Title                                                       Revision
Number
EC-66265         U-2 SW Strainer D/P Spike Op Input                         0
Title
Revision
EC-66265
U-2 SW Strainer D/P Spike Op Input
ER-ANO-2006-
ER-ANO-2006-
248-000
248-000  
GL-89-13         SW System Problems Affecting Safety-Related Equipment
 
GL-89-13
SW System Problems Affecting Safety-Related Equipment  
 
Condition Reports (CR-ANO-)
Condition Reports (CR-ANO-)
1-2013-03239           1-2016-05663           1-2016-05675           1-2016-05676
1-2013-03239
1-2017-00186           1-2018-00132           2-2012-00762           2-2015-02748
1-2016-05663
2-2015-02879           2-2015-05329           2-2016-00035           2-2016-00550
1-2016-05675
2-2016-02987           2-2016-03206           2-2016-03918           2-2016-04462
1-2016-05676
2-2017-05291           2-2017-05919           2-2018-00157           2-2018-00165
1-2017-00186
2-2018-00168           C-2013-03165           C-2016-05226           C-2016-05445
1-2018-00132
C-2017-04059           C-2017-04069           C-2017-04775           C-2018-00277
2-2012-00762
C-2018-00441           C-2018-0299
2-2015-02748
2-2015-02879
2-2015-05329
2-2016-00035
2-2016-00550
2-2016-02987
2-2016-03206
2-2016-03918
2-2016-04462
2-2017-05291
2-2017-05919
2-2018-00157
2-2018-00165
2-2018-00168
C-2013-03165
C-2016-05226
C-2016-05445
C-2017-04059
C-2017-04069
C-2017-04775
C-2018-00277
C-2018-00441
C-2018-0299  
 
71153 - Follow-up of Events and Notices of Enforcement Discretion
71153 - Follow-up of Events and Notices of Enforcement Discretion
Miscellaneous Documents
Miscellaneous Documents
Number           Title
Number
CALC-16-E-       Tornado Missile Shield for Door 77, Room 144
Title
CALC-16-E-
0017-01
0017-01
EC 67019         Door 77, room 144 Tornado Generated Missile Barrier
Tornado Missile Shield for Door 77, Room 144
ECN 73255         Resolution of Rebar Interferences for DR-77 Missile Barrier
EC 67019
Door 77, room 144 Tornado Generated Missile Barrier
ECN 73255
Resolution of Rebar Interferences for DR-77 Missile Barrier  
 
Miscellaneous Documents
Miscellaneous Documents
Number           Title
Number
LER               Tornado Missile Vulnerability Resulting in Condition
Title
05000313/2016-   Prohibited By Technical Specifications
LER
05000313/2016-
2-00
2-00
Tornado Missile Vulnerability Resulting in Condition
Prohibited By Technical Specifications
Condition Reports (CR-ANO-)
Condition Reports (CR-ANO-)
1-2016-01788
1-2016-01788  
 
Other Activities
Other Activities
Design Basis Documents
Design Basis Documents
Number           Title                                               Revision/Date
Number
2.212           72.212 Report for ANO ISFSI                         10
Title
Area-TLD Report Review of 2014 Area Monitoring Results (1st/2nd half) February
Revision/Date
2.212
2.212 Report for ANO ISFSI
Area-TLD Report Review of 2014 Area Monitoring Results (1st/2nd half)
February
2015
2015
Area-TLD Report Review of 2015 Area Monitoring Results (1st/2nd half) February
Area-TLD Report Review of 2015 Area Monitoring Results (1st/2nd half)
February
2016
2016
Area-TLD Report Review of 2016 Area Monitoring Results (1st/2nd half) February
Area-TLD Report Review of 2016 Area Monitoring Results (1st/2nd half)
February
2017
2017
CoC 1014         CoC and Technical Specifications for HI-STORM 100   Amendment 5
CoC 1014
ISFSI FSAR       HI-STORM 100 ISFSI Final Safety Analysis Report     7
CoC and Technical Specifications for HI-STORM 100
LTR-PAR-17-081 Evaluation of XSAM Periodic Test ANO, Two Block         November 20,
Amendment 5
ISFSI FSAR
HI-STORM 100 ISFSI Final Safety Analysis Report
LTR-PAR-17-081 Evaluation of XSAM Periodic Test ANO, Two Block
November 20,
2017
2017
WTHQN-2015-       Surveillance Activity Report                        April 15, 2015
WTHQN-2015-
277
277
WTHQN-2015-      Surveillance Activity Report                         April 15, 2015
Surveillance Activity Report
April 15, 2015
WTHQN-2015-
605
605
WTHQN-2016-       Surveillance Activity Report                         December 9,
Surveillance Activity Report
774                                                                    2016
April 15, 2015
WTHQN-2016-
774
Surveillance Activity Report
December 9,
2016
Miscellaneous Documents
Miscellaneous Documents
Number           Title                                               Date
Number
ANO-1708-0273     Survey of Dry Fuel Pad                               August 16,
Title
Date
ANO-1708-0273
Survey of Dry Fuel Pad
August 16,
2017
2017
ANO-1708-0279     Survey of CTF Dry Fuel Storage Pad                   August 16,
ANO-1708-0279
Survey of CTF Dry Fuel Storage Pad
August 16,
2017
 
Miscellaneous Documents
Number
Title
Date
WTHQN-2016-
775
Surveillance Activity Report
December 9,
2016
WTHQN-2016-
776
Surveillance Activity Report
February 16,
2016
WTHQN-2016-
777
Surveillance Activity Report
December
15, 2016
WTHQN-2017-
111
Surveillance Activity Report
January 25,
2017
2017
Miscellaneous Documents
WTHQN-2017-
Number          Title                                                      Date
WTHQN-2016-      Surveillance Activity Report                                December 9,
775                                                                          2016
WTHQN-2016-      Surveillance Activity Report                                February 16,
776                                                                          2016
WTHQN-2016-      Surveillance Activity Report                                December
777                                                                          15, 2016
WTHQN-2017-      Surveillance Activity Report                                January 25,
111                                                                          2017
WTHQN-2017-      Surveillance Activity Report                                April 27, 2017
2
2
WTHQN-2017-      Surveillance Activity Report                               June 9, 2017
Surveillance Activity Report
April 27, 2017
WTHQN-2017-
453
453
Surveillance Activity Report
June 9, 2017
Procedures
Procedures
Number           Title                                                       Revision
Number
1015.003B       Unit Two Operations Logs                                   80
Title
EDR-1           Generic Licensing Topical Report for L-3 Crane             3
Revision
EN-DC-215       Fuel Selection for Holtec Dry Cask Storage for Canisters 48 6
1015.003B
Unit Two Operations Logs
EDR-1
Generic Licensing Topical Report for L-3 Crane
EN-DC-215
Fuel Selection for Holtec Dry Cask Storage for Canisters 48
through 57
through 57
EN-LI-100       Process Applicability Determination                         20
EN-LI-100
EN-LI-101       10 CFR 50.59 Evaluations                                   15
Process Applicability Determination
EN-LI-112       10 CFR 72.48 Evaluations                                   12
EN-LI-101
EN-LI-115       HI-STORM 100 ISFSI Licensing Document Preparation and 7
CFR 50.59 Evaluations
EN-LI-112
CFR 72.48 Evaluations
EN-LI-115
HI-STORM 100 ISFSI Licensing Document Preparation and
Control
Control
EN-RP-210       Area Monitoring Program                                     1
EN-RP-210
OP-3403.004     HI-STORM 100 System Equipment Preparation                   18
Area Monitoring Program
OP-3403.005     HI-STORM 100 System Loading Operations                     40
OP-3403.004
OP-3403.008     HI-TRAC and MPC Preparations for Fuel Loading               1
HI-STORM 100 System Equipment Preparation
OP-3403.009     MPC Receipt Inspections                                     1
OP-3403.005
OP-3403.010     HI-STORM Overpack Receipt Inspections                       1
HI-STORM 100 System Loading Operations
OP-3406.005     Hi-STORM and HI-TRAC Transport Operations                   14
OP-3403.008
OP-3406.006     Forced Helium Dehydration System Operations                 9
HI-TRAC and MPC Preparations for Fuel Loading
OP-3406.007     Supplemental Cooling System Operations                     8
OP-3403.009
MPC Receipt Inspections
OP-3403.010
HI-STORM Overpack Receipt Inspections
OP-3406.005
Hi-STORM and HI-TRAC Transport Operations
OP-3406.006
Forced Helium Dehydration System Operations
OP-3406.007
Supplemental Cooling System Operations  
 
2.48 Evaluations
2.48 Evaluations
Number           Title                                                   Date
Number
DFS-15-001       72.48 Evaluation, Foreign Material                       December
Title
Date
DFS-15-001
2.48 Evaluation, Foreign Material
December
2, 2015
2, 2015
DFS-16-001       72.48 Evaluation, Application of Concrete Sealant       January 21,
DFS-16-001
2.48 Evaluation, Application of Concrete Sealant
January 21,
2016
2016
Condition Reports (CR-ANO-)
Condition Reports (CR-ANO-)
1-2017-3441             1-2017-3445             1-2017-3447         1-2017-3448
1-2017-3441
1.2017-3449             1.2017-3450             1-2017-3451         1-2017-3538
1-2017-3445
1-2017-3540             1-2017-3541             1-2017-3555         1-2016-0403
1-2017-3447
2-2015-2420             2-2016-0359             2-2016-2071         C-2015-0849
1-2017-3448
C-2015-0918             C-2015-0969             C-2015-1185         C-2015-2297
1.2017-3449
C-2015-2765             C-2015-3387             C-2015-4664         C-2015-4693
1.2017-3450
C-2015-4905             C-2015-4971             C-2016-0038         C-2016-0834
1-2017-3451
C-2016-0848             C-2016-1344             C-2016-2844         C-2016-3647
1-2017-3538
C-2016-4458             C-2017-2506             C-2017-2850
1-2017-3540
1-2017-3541
1-2017-3555
1-2016-0403
2-2015-2420
2-2016-0359
2-2016-2071
C-2015-0849
C-2015-0918
C-2015-0969
C-2015-1185
C-2015-2297
C-2015-2765
C-2015-3387
C-2015-4664
C-2015-4693
C-2015-4905
C-2015-4971
C-2016-0038
C-2016-0834
C-2016-0848
C-2016-1344
C-2016-2844
C-2016-3647
C-2016-4458
C-2017-2506
C-2017-2850  
 
Engineering Changes
Engineering Changes
EC-15295           EC-37094         EC-42379           EC-45077       EC-48646
EC-15295
EC-48806           EC-52044         EC-52619           EC-54103       EC-59072
EC-37094
EC-63881           EC-73641
EC-42379
EC-45077
EC-48646
EC-48806
EC-52044
EC-52619
EC-54103
EC-59072
EC-63881
EC-73641  
 
Work Orders
Work Orders
00065585           00408695         00419603           00439666       00479654
00065585
00488244           00489244         52393253            52576506      52629825
00408695
2629826           52638961          52663017            52667631      52687172
00419603
2687173           52701892          52707684            52719037
00439666
00479654
00488244
00489244
2393253
2576506
2629825
2629826
2638961
2663017
2667631
2687172
2687173
2701892
2707684
2719037
 
The following items are requested for the
The following items are requested for the
Occupational Radiation Safety Inspection
Occupational Radiation Safety Inspection
Line 878: Line 1,471:
Please submit this information using the same lettering system as below. For example, all
Please submit this information using the same lettering system as below. For example, all
contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled
contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled
1- A, applicable organization charts in file/folder 1- B, etc.
1-A, applicable organization charts in file/folder 1-B, etc.
If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at
If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at
least 30 days later than the on-site inspection dates, so the inspectors will have access to the
least 30 days later than the on-site inspection dates, so the inspectors will have access to the
Line 890: Line 1,483:
file the information can be found.
file the information can be found.
If you have any questions or comments, please contact Natasha Greene at (817) 200-1154 or
If you have any questions or comments, please contact Natasha Greene at (817) 200-1154 or
natasha.greene@nrc.gov.
natasha.greene@nrc.gov.  
 
PAPERWORK REDUCTION ACT STATEMENT
PAPERWORK REDUCTION ACT STATEMENT
This letter does not contain new or amended information collection requirements subject
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget,
collection requirements were approved by the Office of Management and Budget,
control number 3150-0011.
control number 3150-0011.  
1. Radiological Hazard Assessment and Exposure Controls (71124.01) and
 
1.
Radiological Hazard Assessment and Exposure Controls (71124.01) and
Performance Indicator Verification (71151)
Performance Indicator Verification (71151)
Date of Last Inspection:         April 10, 2017
Date of Last Inspection:
A. List of contacts and telephone numbers for the Radiation Protection Organization Staff
April 10, 2017
A.
List of contacts and telephone numbers for the Radiation Protection Organization Staff
and Technicians
and Technicians
B. Applicable organization charts
B.
: [[contact::C. Audits]], self-assessments, and LERs written since date of last inspection, related to this
Applicable organization charts
C.
Audits, self-assessments, and LERs written since date of last inspection, related to this
inspection area
inspection area
D. Procedure indexes for the radiation protection procedures
D.
E. Please provide specific procedures related to the following areas noted below.
Procedure indexes for the radiation protection procedures
E.
Please provide specific procedures related to the following areas noted below.
Additional Specific Procedures may be requested by number after the inspector reviews
Additional Specific Procedures may be requested by number after the inspector reviews
the procedure indexes.
the procedure indexes.
Line 917: Line 1,519:
8. Radioactive Source Inventory and Control
8. Radioactive Source Inventory and Control
9. Declared Pregnant Worker Program
9. Declared Pregnant Worker Program
F. List of corrective action documents (including corporate and sub-tiered systems) since
F.
List of corrective action documents (including corporate and sub-tiered systems) since
date of last inspection
date of last inspection
a. Initiated by the radiation protection organization
a. Initiated by the radiation protection organization
Line 928: Line 1,531:
dose limit or administrative dose limit was exceeded (for Public Radiation Safety
dose limit or administrative dose limit was exceeded (for Public Radiation Safety
Performance Indicator verification in accordance with IP 71151)
Performance Indicator verification in accordance with IP 71151)
G. List of radiologically significant work activities scheduled to be conducted during the
G.
List of radiologically significant work activities scheduled to be conducted during the
inspection period (If the inspection is scheduled during an outage, please also include a
inspection period (If the inspection is scheduled during an outage, please also include a
list of work activities greater than 1 rem, scheduled during the outage with the dose
list of work activities greater than 1 rem, scheduled during the outage with the dose
estimate for the work activity.)
estimate for the work activity.)
H. List of active radiation work permits
H.
I. Radioactive source inventory list
List of active radiation work permits  
a.       All radioactive sources that are required to be leak tested
 
b.       All radioactive sources that meet the 10 CFR Part 20, Appendix E, Category 2
I.
and above threshold. Please indicate the radioisotope, initial and current activity
Radioactive source inventory list
            (w/assay date), and storage location for each applicable source.
a.
J. The last two leak test results for the radioactive sources inventoried and required to be
All radioactive sources that are required to be leak tested
b.
All radioactive sources that meet the 10 CFR Part 20, Appendix E, Category 2
and above threshold. Please indicate the radioisotope, initial and current activity  
(w/assay date), and storage location for each applicable source.
J.
The last two leak test results for the radioactive sources inventoried and required to be
leak tested. If applicable, specifically provide a list of all radioactive source(s) that have
leak tested. If applicable, specifically provide a list of all radioactive source(s) that have
failed its leak test within the last two years
failed its leak test within the last two years
: [[contact::K. A current listing of any non-fuel items stored within your pools]], and if available, their
K.
A current listing of any non-fuel items stored within your pools, and if available, their
appropriate dose rates (Contact / @ 30cm)
appropriate dose rates (Contact / @ 30cm)
L. Computer printout of radiological controlled area entries greater than 100 millirem since
L.
Computer printout of radiological controlled area entries greater than 100 millirem since
the previous inspection to the current inspection entrance date. The printout should
the previous inspection to the current inspection entrance date. The printout should
include the date of entry, some form of worker identification, the radiation work permit
include the date of entry, some form of worker identification, the radiation work permit
used by the worker, dose accrued by the worker, and the electronic dosimeter dose
used by the worker, dose accrued by the worker, and the electronic dosimeter dose
alarm set-point used during the entry (for Occupational Radiation Safety Performance
alarm set-point used during the entry (for Occupational Radiation Safety Performance
Indicator verification in accordance with IP 71151).
Indicator verification in accordance with IP 71151).  
2. Occupational ALARA Planning and Controls (71124.02)
 
Date of Last Inspection:         November 6, 2017
2.
A. List of contacts and telephone numbers for ALARA program personnel
Occupational ALARA Planning and Controls (71124.02)
B. Applicable organization charts
Date of Last Inspection:
: [[contact::C. Copies of audits]], self-assessments, and LERs, written since date of last inspection,
November 6, 2017
A.
List of contacts and telephone numbers for ALARA program personnel
B.
Applicable organization charts
C.
Copies of audits, self-assessments, and LERs, written since date of last inspection,
focusing on ALARA
focusing on ALARA
D. Procedure index for ALARA Program
D.
E. Please provide specific procedures related to the following areas noted below.
Procedure index for ALARA Program
E.
Please provide specific procedures related to the following areas noted below.
Additional Specific Procedures may be requested by number after the inspector reviews
Additional Specific Procedures may be requested by number after the inspector reviews
the procedure indexes.
the procedure indexes.
Line 962: Line 1,582:
2. ALARA Committee
2. ALARA Committee
3. Radiation Work Permit Preparation
3. Radiation Work Permit Preparation
F. A summary list of corrective action documents (including corporate and sub-tiered
F.
A summary list of corrective action documents (including corporate and sub-tiered
systems) written since date of last inspection, related to the ALARA program. In addition
systems) written since date of last inspection, related to the ALARA program. In addition
to ALARA, the summary should also address Radiation Work Permit violations,
to ALARA, the summary should also address Radiation Work Permit violations,
Line 969: Line 1,590:
criteria used. Please provide in document formats which are searchable so that
criteria used. Please provide in document formats which are searchable so that
the inspector can perform word searches.
the inspector can perform word searches.
: [[contact::G. List of work activities greater than 1 rem]], since date of last inspection,
G.
List of work activities greater than 1 rem, since date of last inspection,
Include original dose estimate and actual dose.
Include original dose estimate and actual dose.
H. Site dose totals and 3-year rolling averages for the past 3 years (based on dose of
H.
Site dose totals and 3-year rolling averages for the past 3 years (based on dose of
record)
record)
I. Outline of source term reduction strategy
I.
: [[contact::J. If available]], provide a copy of the ALARA outage report for the most recently completed
Outline of source term reduction strategy
J.
If available, provide a copy of the ALARA outage report for the most recently completed
outages for each unit
outages for each unit
K. Please provide your most recent Annual ALARA Report.
K.
Please provide your most recent Annual ALARA Report.  


ML18120A214
ML18120A214
SUNSI Review               Non-Sensitive              Publicly Available    Keyword:
SUNSI Review
By: NFO/rdr                 Sensitive                   Non-Publicly Available NRC-002
By: NFO/rdr
OFFICE       SPE:DRP/E       C:DRP/E
Non-Sensitive
NAME             JDixon       NOKeefe
Sensitive
SIGNATURE         /RA/           /RA/
Publicly Available
DATE             4/30/18       4/30/18
Non-Publicly Available
Keyword:
NRC-002
OFFICE
SPE:DRP/E
C:DRP/E  
 
NAME
JDixon
NOKeefe  
 
SIGNATURE  
/RA/  
/RA/  
 
DATE
4/30/18
4/30/18
}}
}}

Latest revision as of 23:13, 5 January 2025

NRC Integrated Inspection Report 05000313/2018001 and 05000368/2018001 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2017001
ML18120A214
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 04/30/2018
From: O'Keefe N
NRC/RGN-IV/DRP/RPB-E
To: Richard Anderson
Entergy Operations
O'Keefe C
References
IR 2017001, IR 2018001
Download: ML18120A214 (42)


Text

April 30, 2018

SUBJECT:

ARKANSAS NUCLEAR ONE - NRC INTEGRATED INSPECTION REPORT 05000313/2018001 AND 05000368/2018001 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION INSPECTION REPORT 07200013/2017001

Dear Mr. Anderson:

On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Arkansas Nuclear One facility, Units 1 and 2. On April 5, 2018, the NRC inspectors discussed the results of this inspection with Mr. John Kirkpatrick, General Manager of Plant Operations, and other members of your staff. On April 18, 2018, the NRC inspectors exited to modify the characterization of one finding with Ms. Stephanie Pyle, Regulatory Assurance Manager. The results of this inspection are documented in the enclosed report.

NRC inspectors documented two findings of very low safety significance (Green) in this report.

Both of these findings involved a violation of NRC requirements. Additionally, NRC inspectors documented a licensee-identified violation, which was determined to be of very low safety significance (Green), in this report. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violations or significance of the NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC resident inspector at the Arkansas Nuclear One.

If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at the Arkansas Nuclear One. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Neil OKeefe, Chief Branch E Division of Reactor Projects

Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6

Enclosure:

Inspection Report 05000313/2018001 and 05000368/2018001 and 07200013/2017001 w/ Attachments:

1. Documents Reviewed 2. O

Inspection Report

Docket Numbers:

05000313; 05000368; and 07200013

License Numbers:

DPR-51; NPF-6

Report Numbers:

05000313/2018001; 05000368/2018001; and 07200013/2017001

Enterprise Identifier: I-2018-001-0005

Licensee:

Entergy Operations, Inc.

Facility:

Arkansas Nuclear One, Units 1 and 2, and Independent Spent Fuel

Storage Installation

Location:

Junction of Highway 64 West and Highway 333 South

Russellville, Arkansas

Inspection Dates:

January 1, 2018 to March 31, 2018

Inspectors:

C. Henderson, Senior Resident Inspector

P. Smagacz, Acting Senior Resident Inspector

T. Sullivan, Resident Inspector

M. Tobin, Resident Inspector

L. Brookhart, Senior Inspector

N. Greene, Ph.D., Senior Health Physicist

J. ODonnell, CHP, Health Physicist

Approved By:

N. OKeefe, Branch Chief

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Arkansas Nuclear One, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC-identified and self-revealed findings and violations, and additional items are summarized in the tables below.

A licensee-identified, non-cited violation is documented in report Section 71124.0

List of Findings and Violations

Failure to Establish Adequate Criteria for Flood Seal Testing Cornerstone Significance Cross-cutting Aspect Inspection Procedure Mitigating Systems Green Finding NCV 05000313/2018001-01 and 05000368/2018001-01 Closed

[H.12] - Avoid Complacency 71111.01 -

External Flooding The inspectors identified a Green finding and associated non-cited violation of Unit 1 Technical Specification 5.4.1.a and Unit 2 Technical Specification 6.4.1.a for the licensees failure to establish the criteria for ensuring the necessary conditions existed for a successful test of hatch flood seals. Specifically, Procedure OP 1402.240, Inspection of Watertight Hatches,

Revision 1, did not contain adequate guidance to ensure that the auxiliary building was at a lower pressure than the turbine building such that puffing smoke on the turbine building side would allow a seal leak to be detectable.

Failure to Preplan and Perform Service Water Pre-Screen Maintenance Cornerstone Significance Cross-cutting Aspect Inspection Procedure Mitigating Systems Green Finding NCV 05000368/2018001-02 Closed

[H.12] - Avoid Complacency 71152 -

Problem Identification and Resolution The inspectors reviewed a self-revealed, non-cited violation and associated finding of Arkansas Nuclear One, Unit 2, Technical Specification 6.4.1.a, for the licensees failure to properly preplan maintenance that can affect the performance of safety-related equipment.

Specifically, the licensee failed to properly preplan pre-screen cleaning maintenance, causing the train B service water system to become inoperable.

Additional Tracking Items

Type Issue number Title Inspection Procedure Status URI 7200013/2012001-02 Validation of the ANO data collected during the thermal validation test and used in the Holtec analysis 60855.1 Closed

Type Issue number Title Inspection Procedure Status URI 7200013/2012001-03 Applicability of the ANO thermal validation test results to other HI-STORM 100 overpack configurations 60855.1 Closed LER 05000313/2016-002-00 Tornado Missile Vulnerability Resulting in Condition Prohibited By Technical Specifications 71153 Closed

PLANT STATUS

Unit 1 began the inspection period at full power. On March 24, 2018, the unit was shut down to begin Refueling Outage 1R27.

Unit 2 began the inspection period at full power. On January 14, 2018, the unit reduced power to 83 percent to perform planned condenser water box cleaning. The unit was returned to rated thermal power on January 19,

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515, Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather (1 Sample)

The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal cold temperatures.

  • Unit 1 and Unit 2 diesel fuel oil vault on January 30, 2018
  • Alternate ac diesel generator on January 30, 2018
  • Unit 1 and Unit 2 emergency cooling pond on January 30, 2018

External Flooding (1 Sample)

The inspectors evaluated readiness to cope with external flooding on March 16, 2018.

A finding associated with this inspection is documented in the Inspection Results section below.

71111.04 - Equipment Alignment

Partial Walkdown (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 2 train A emergency feedwater system during planned maintenance of train B emergency feedwater system on February 7, 2018
(2) Unit 2 swing service water pump B aligned to the emergency cooling pond during intake structure pre-screen cleaning and maintenance on February 22, 2018
(3) Unit 2 emergency diesel generator 2 ventilation system on March 2, 2018
(4) Unit 1 temporary reactor vessel level identification system on March 28, 2018

Complete Walkdown (1 Sample)

The inspectors evaluated system configurations during a complete walkdown of the Unit 2 service water system on March 14, 2018.

71111.05 - Fire Protection Annual/Quarterly

Quarterly Inspection (4 Samples)

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Unit 2 auxiliary building corridor 2109 temporary safety-related battery heating, Fire Area MM, Fire Zone 2103-V, on January 30, 2018
(2) Unit 1 cable spreading room, Fire Area G, Fire Zone 97-R, on January 31, 2018
(3) Unit 2 upper south piping penetration room, Fire Area EE-L, Fire Zone 2084-DD, on February 8, 2018
(4) Unit 2 lower south piping penetration room, Fire Area EE-L, Fire Zone 2055-JJ, on February 8, 2018

Annual Inspection (1 Sample)

The inspectors evaluated fire brigade performance in the Unit 1 control room for a simulated fire emergency feedwater pump room and the Unit 2 turbine deck for a simulated fire in the turbine generator on January 4, 2018, and March 09, 2018.

71111.06 - Flood Protection Measures

Internal Flooding (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the Unit 2 emergency feedwater room floor drain system on March 16, 2018.

Cables (1 Sample)

The inspectors evaluated cable submergence protection in Manhole 8 on March 1, 2018.

71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance

Operator Requalification (2 Samples)

(1) The inspectors observed and evaluated Unit 1 simulator training for operating crews on reactor shutdown and decay heat removal on February 22, 2018.
(2) The inspectors observed and evaluated Unit 2 simulator training for operating crews on reactor coolant pump motor fire and security related events on February 22, 2018.

Operator Performance (2 Samples)

(1) The inspectors observed and evaluated Unit 2 return to near 100 percent power following condenser cleaning on January 18, 2018.
(2) The inspectors observed and evaluated Unit 1 reactor shutdown for commencing Refuel Outage 1R27 on March 23, 2018.

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness (3 Samples)

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) Unit 1 rod control system on January 31, 2018
(2) Unit 2 service water system on March 6, 2018
(3) Internal and external flood seals on March 16, 2018

Quality Control (1 Sample)

The inspectors evaluated maintenance and quality control activities associated with the following equipment performance issues:

(1) Unit 2 control element assembly system on January 31, 2018

71111.13 - Maintenance Risk Assessments and Emergent Work Control

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Unit 2 planned work activities for control element assembly 5 repair on January 5, 2018
(2) Unit 2 emergent work activities for emergency diesel generator 2 on January 10, 2018
(3) Unit 2 emergent work activities for service water pump A and C strainer cleaning following high differential pressure alarm during pre-screen cleaning on January 19, 2018
(4) Unit 1 and Unit 2 planned work activities for startup transformer 1 and 3 outage for autotransformer insulator repair on February 2, 2018
(5) Unit 2 planned work activities for service water bay pre-screen cleaning and maintenance on February 22, 2018
(6) Unit 2 service water pre-screen cleaning on February 22, 2018

71111.15 - Operability Determinations and Functionality Assessments

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Unit 1 operability determination for auxiliary building tornado missile protection wall missing rebar on January 18, 2018
(2) Unit 1 operability determination for emergency feedwater control valve, CV-2646, stroke time outside operability limits on January 22, 2018
(3) Unit 2 operability determination for emergency diesel generator 2 relay failure and automatic start function for containment coolers on January 24, 2018
(4) Unit 1 and Unit 2 operability determination for emergency cooling pond during cold weather impact of safety-related pumps operating oil temperature on January 31, 2018
(5) Unit 1 and Unit 2 operability determination for 500 kV offsite circuit autotransformer damaged insulator on February 9, 2018
(6) Unit 2 functional determination emergency feedwater system room floor drain system on March 16, 2018

71111.18 - Plant Modifications

The inspectors evaluated the following temporary or permanent modifications:

(1) Unit 2 temporary modification for lifting leads for control element assembly 4 for degraded upper gripper coils on January 5, 2018
(2) Unit 2 temporary battery room heating on January 30, 2018

71111.19 - Post Maintenance Testing

The inspectors evaluated the following post maintenance tests:

(1) Unit 2 replacement of service water pump A and C strainers on January 20, 2018
(2) Unit 1 auxiliary building hatch HTC-492 smoke testing following resin transfer on February 14, 2018
(3) Unit 2 motor driven emergency feedwater pump flow transmitter calibration due to the transmitter reading low out of range on February 20, 2018
(4) Unit 1 temporary reactor vessel level indication due valve, RC-1, repair on March 28, 2018

71111.20 - Refueling and Other Outage Activities (Partial Sample)

The inspectors evaluated Unit 1 Refueling Outage 1R27 activities from March 24, 2018, to March 31, 2018. The inspectors completed inspection procedure Sections 03.01.a and 03.01.c.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Routine

(1) Unit 1 emergency feedwater solenoid operated control valve, CV-2646, establishment of stroke time reference value and acceptance criteria on January 25, 2018
(2) Unit 1 and Unit 2 verified correct breaker alignment and indicated power availability for the 161 kV offsite circuited with the 500 kV offsite inoperable during autotransformer insulator repair on February 2, 2018
(3) Unit 1 train A reactor protection system and rod control system ac breaker surveillance trip testing on February 27, 2018

In-service (1 Sample)

(1) Unit 2 service water motor operated valve, 2CV-1435-1, service water inlet to train A shutdown heat exchanger on March 15, 2018

Reactor Coolant System Leak Detection (1 Sample)

(1) Unit 1 small increase of unidentified leakage on March 2,

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

Radiological Hazard Assessment (1 Sample)

The inspectors evaluated radiological hazards assessments and controls.

Instructions to Workers (1 Sample)

The inspectors evaluated worker instructions.

Contamination and Radioactive Material Control (1 Sample)

The inspectors evaluated contamination and radioactive material controls.

Radiological Hazards Control and Work Coverage (1 Sample)

The inspectors evaluated radiological hazards control and work coverage.

High Radiation Area and Very High Radiation Area Controls (1 Sample)

The inspectors evaluated risk-significant high radiation area and very high radiation area controls.

Radiation Worker Performance and Radiation Protection Technician Proficiency (1 Sample)

The inspectors evaluated radiation worker performance and radiation protection technician proficiency.

71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls

Implementation of ALARA and Radiological Work Controls (1 Sample)

The inspectors reviewed ALARA practices and radiological work controls by reviewing the following activities and/or work packages:

(1) 2017-1070, core bore National Fire Protection Association (NFPA) 805 project and support activities
(2) 2018-1414, as low as reasonable achievable (ALARA) activities during 1R27
(3) 2018-1420, scaffold installation/removal non-Locked High Radiation Areas - 1R27
(4) 2018-1430, reactor disassembly, reassembly, and support activities
(5) 2018-1900, emergent maintenance activities during 1R27

Radiation Worker Performance (1 Sample)

The inspectors evaluated radiation worker and radiation protection technician performance.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

=

(1) IE01: Unplanned Scrams per 7000 Critical Hours Sample, Unit 1 and Unit 2, (January 1, 2017, through December 31, 2017)
(2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample, Unit 1 and Unit 2, (January 1, 2017, through December 31, 2017)
(3) IE04: Unplanned Scrams with Complications Sample, Unit 1 and Unit 2, (January 1, 2017, through December 31, 2017)
(4) OR01: Occupational Exposure Control Effectiveness Sample (April 1, 2017, through March 30, 2018)
(5) PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual (RETS/ODCM) Radiological Effluent Occurrences Sample (April 1, 2017, through March 30, 2018)

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Unit 2 train B service water inoperable due to strainer high differential pressure during pre-screen cleaning following winter shad run on March 27, 2018 A finding associated with this inspection is documented in the Inspection Results section below.

71153 - Follow-up of Events and Notices of Enforcement Discretion Events

(1) The inspectors evaluated licensees response to Unit 2 entry into loss of service water abnormal operating procedure due to service water pump A and C strainer high differential pressure alarm during pre-screen cleaning on January 19, 2018.
(2) The inspectors evaluated licensees response to Unit 1 and Unit 2 cyber security issues on the business network on February 6, 2018.

Licensee Event Reports (LERs) (1 Sample)

The inspectors evaluated the following licensee event reports which can be accessed at https://lersearch.inl.gov/LERSearchCriteria.aspx:

(1) LER 05000313/2016-002-00, Tornado Missile Vulnerability Resulting in Condition Prohibited By Technical Specifications, on February 5,

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 60855.1 - Operation of an Independent Spent Fuel Storage Installation at Operating Plants The inspectors evaluated the licensees operation of the independent spent fuel storage installation (ISFSI) from October 30 to November 2, 2017, on-site at ANO, and conducted an in-office review of additional documentation related to licensees maintenance of their cask handling crane until January 2018.

The ANO ISFSI consisted of four ISFSI pads. ANO had loaded 24 canisters of the Energy Solutions ventilated storage cask (VSC) VSC-24 design (Certificate of Compliance No. 1007) from 1996 to 2003. Since that time, ANO had been loading HI-STORM 100S Version C overpacks. ANOs ISFSI contained a total of 57 HI-STORM overpacks with 32 MPC-24 canisters and 25 MPC-32 canisters, at the time of the routine inspection. ANO was currently loading canisters to the Holtec Certificate of Compliance 1014, Amendment 5, and Final Safety Analysis Report (FSAR), Revision 7.

The ISFSI activities specifically reviewed during the on-site inspection and the subsequent in-office review included:

(1) Evaluated and observed fuel selection and fuel loading operations.
(2) Reviewed the licensee's loading, processing, and heavy load procedures associated with their current dry fuel storage campaign.
(3) Reviewed licensees corrective action program implementation for ISFSI operations since the last routine ISFSI inspection which was completed in December 2015.
(4) Reviewed quality assurance (QA) program implementation, including recent QA audits, surveillances, receipt inspection, and quality control activities.
(5) Reviewed documentation related to technical specification (TS) required operational surveillance activities and Final Safety Analysis Report (FSAR) required annual maintenance activities.
(6) Reviewed the licensees radiological monitoring data for the calendar years 2014, 2015, and 2016.
(7) Reviewed spent fuel documentation for the canisters loaded since the last routine ISFSI inspection (Holtec Canister 48-57) to confirm the fuel met all TS requirements for storage and transportation.
(8) Reviewed annual maintenance activities for heavy lifting components which included special lifting devices and the sites cask handling crane (Auxiliary Building L-3 crane).
(9) Reviewed all 72.48 safety evaluations/screenings for changes made to the licensees ISFSI operations in accordance with Inspection Procedure 60857 since the last routine ISFSI inspection.
(10) Reviewed all changes made to the licensees 72.212 Report (Revision 10) in accordance with Inspection Procedure 60856.1 since the last routine ISFSI inspection.

Additionally, inspectors closed two unresolved items (URIs) from a routine ISFSI inspection conducted in 2012 (see Inspection Results).

INSPECTION RESULTS

Failure to Establish Adequate Criteria for Flood Seal Testing Cornerstone Significance Cross-cutting Aspect Report Section Mitigating Systems

Green NCV 05000313/2018001-01 and 05000368/2018001-01 Closed

[H.1] -

Resources

71111.01 - External

Flooding The inspectors identified a Green finding and associated non-cited violation of Unit 1 Technical Specification 5.4.1.a and Unit 2 Technical Specification 6.4.1.a for the licensees failure to establish the criteria for ensuring the necessary conditions existed for a successful test of hatch flood seals. Specifically, Procedure OP 1402.240, Inspection of Watertight Hatches, Revision 01, did not contain adequate guidance to ensure that the auxiliary building was at a lower pressure than the turbine building such that puffing smoke on the turbine building side would allow a seal leak to be detectable.

Description:

As part of corrective actions to prevent recurrence for Yellow finding 05000313/2014009-01 and 05000368/2014009-01, the licensee improved the preventive maintenance for flood seals on hatches that prevented flood waters from external sources from entering the auxiliary building, where safety-related accident mitigation equipment was located. These actions included a new testing protocol which established a pressure differential across the seal, then puffed chemical smoke around the seal and observed for leaks. Known as a smoke test, this method requires that air pressure inside the auxiliary building be lower than turbine building air pressure so that when smoke is puffed around the outside of the seal, the smoke would be pulled into the lower pressure area on the other side, and leaks would be detectable.

On November 29, 2017, as part of a Confirmatory Action Letter Inspection, NRC inspectors reviewed corrective actions and observed a smoke test of hatch 492. The inspector noted that test personnel had checked that the auxiliary building ventilation was in a normal alignment, but had assumed that this meant that pressure was lower on the auxiliary building side of the hatch. When the licensee agreed to measure the pressure on each side of the hatch, pressure was actually higher on the auxiliary building side such that leakage would not have been detectable.

Procedure OP 1402.240, Inspection of Watertight Hatches, Revision 01, directed personnel to ensure negative ventilation in the auxiliary building prior to start. However, the procedure did not state how much pressure differential was needed or how this was to be measured.

The inspector determined that all six hatches that serve as flood barriers were previously tested using the inadequate procedure. Upon discovery, the licensee took action to ensure that a negative ventilation in the auxiliary building would be established and verified as part of the procedure. When re-tested, all hatches passed the smoke test.

Corrective Action(s): The corrective action was to make changes to the procedure to establish appropriate ventilation lineup and re-perform the smoke tests at all locations.

Corrective Action Reference(s): Condition Report CR-ANO-C-2017-04759

Performance Assessment:

Performance Deficiency: The licensees failure to establish adequate prerequisite criteria for smoke testing flood seals on hatches is a performance deficiency.

Screening: The performance deficiency is more than minor because, if left uncorrected, it has the potential to become a more significant safety concern. Specifically, because Procedure OP 1402.240 did not have adequate instructions to ensure the appropriate ventilation lineup, hatch flood seals would always pass the test regardless of whether the seal would allow water to pass or not. Therefore, any flooding or pipe rupture could lead to water ingress into the Unit 1 and Unit 2 auxiliary buildings affecting the availability of mitigating equipment needed to respond to flooding. This finding affects the Mitigating Systems Cornerstone.

Significance: The inspectors assessed the significance of the finding using Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012. The inspectors determined that the finding had very low safety significance (Green) because the equipment or safety function was not completely failed or unavailable, and because the finding does not involve the total loss of any safety function, identified by the licensee through a probabilistic risk assessment (PRA),individual plant examination of external events (IPEEE), or similar analysis, that contributes to external event initiated core damage accident sequences. Specifically, since the hatches were confirmed to be leak tight after re-testing, no actual loss of function occurred.

Cross-cutting Aspect: This finding has a cross-cutting aspect in the area of human performance associated with avoiding complacency, because the individuals failed to verify that procedure prerequisites were met rather than assume they are met based on general plant conditions.

Enforcement:

Violation: Technical Specification 5.4.1.a for Unit 1 and Technical Specification 6.4.1.a for Unit 2 requires, in part, that written procedures be established, implemented, and maintained covering the applicable procedures recommended in Appendix A to Regulatory Guide 1.33, Quality Assurance Program Requirements, Revision 2, February 1978. Regulatory Guide 1.33, Appendix A, Section 9.a, states that maintenance that can affect the performance of safety-related equipment should be properly preplanned and performed in accordance with written procedures, documented instructions, or drawings appropriate to the circumstances.

Contrary to the above, on November 29, 2017, the licensee failed to properly preplan and perform maintenance that can affect the performance of safety-related equipment in accordance with written procedures, document instructions, or drawings appropriate to the circumstances. Specifically, Procedure 1402.240, Inspection of Watertight Hatches, Revision 01, failed to include adequate details needed to not verify that the auxiliary building was at a lower pressure than the turbine building prior to performing a smoke test of the flood seal of hatch 492. Under the existing conditions, the test would have passed even with a degraded seal. This condition had the potential to affect the performance of safety-related mitigating equipment needed to respond to a flooding event.

Disposition: This violation is being treated as a non-cited violation, consistent with Section 2.3.2.a of the Enforcement Policy, because it was very low safety significance (Green) and was entered into the licensees corrective action program as Condition Report CR-ANO-C-2017-04759.

Failure to Preplan and Perform Service Water Pre-Screen Maintenance Cornerstone Significance Cross-cutting Aspect Report Section Mitigating Systems Green NCV 05000368/2018001-02 Closed

[H.12] - Avoid Complacency

71152 - Annual

Follow-up of Selected Issues The inspectors reviewed a self-revealed, non-cited violation and associated finding of Arkansas Nuclear One, Unit 2, Technical Specification 6.4.1.a, for the licensees failure to properly preplan maintenance that can affect the performance of safety-related equipment.

Specifically, the licensee failed to properly preplan pre-screen cleaning maintenance, causing the train B service water system to become inoperable.

Description:

On January 19, 2018, ANO Unit 2 was operating in Mode 1 and making preparations to clean the intake structure service water pre-screens in accordance with Operating Procedure (OP) 2104.029, Service Water System Operations, Change 109. Two operable trains of service water are required per Unit 2 Technical Specification 3.7.3.1, Service Water System while in Mode 1.

The ANO Unit 2 service water system has stationary pre-screens between the traveling screens and the pumps that must be manually hoisted out of the flow stream to be cleaned.

The configuration is such that debris can be knocked loose and fall back into the flow stream during cleaning and enter both running pumps. The pre-screens are intended to catch small debris that was not removed by the traveling screen so that the strainer baskets located downstream of each pump do not get clogged. The discharge strainer basket design does not have a self-cleaning feature.

Between January 16, 2018, through dayshift January 18, 2018, the licensee was aware that they were experiencing a shad (fish) run in the intake canal. The pre-screen differential pressure (D/P) had been exhibiting a rising trend due to debris buildup. During this timeframe, the pre-screen and traveling screen D/P went from 3.00 inches of water to 6.75 inches of water. At 8:52 pm on January 18, 2018, the licensee received the service water high differential pressure alarm and pre-screen D/P was 9.5 inches of water, with a procedural requirement to initiate action to clean the pre-screens at 8 inches of water. Prior to the licensee cleaning the pre-screens, D/P reached 18 inches of water. This rate of debris buildup was unusual considering most D/P effects on the screen are witnessed on ANO Unit 1 screens and not ANO Unit 2 screens. Based on past experience of slow build-up of debris, the licensee delayed pre-screen cleaning until 4:14 a.m. on January 19, 2018, to avoid having maintenance personnel exceed fatigue management limits.

During the lifting and removal of the first pre-screen for cleaning, fish were observed to be falling off and entering the suction of the A (SW-P-A) and C (SW-P-C) service water pumps.

As a result, the Unit 2 control room received SW-P-A and SW-P-C discharge strainer high differential pressure (D/P) annunciators. The SW-P-A discharge strainer D/P peaked at 12.8 psid, and the SW-P-C discharge strainer D/P peaked at 24.1 psid. The licensee entered abnormal Operating Procedure 2203.022, Loss of Service Water, Revision 14, and assessed the operability of train A and B service water systems. The swing pump suction was aligned to the emergency cooling pond and the pump started so that a second train of service water could be made available if needed.

Following an engineering evaluation, train B service water system was declared inoperable due to exceeding the 20 psid operability limit for the SW-P-C strainer; train A service water system remained operable throughout the event. Over the course of the rest of the day, the licensee manipulated the service water system to clean the rest of the pre-screens and the service water pump discharge strainers and reestablish train B service water system operability. The train B service water system was declared operable at 10:10 p.m. on January 19, 2018, at which time the Loss of Service Water procedure was exited. The licensees short term corrective action was to implement a standing order for service water pre-screens and traveling screens that required operations personnel to log both pre-screen and traveling screen D/P and clean traveling screens at least weekly and pre-screens weekly.

The licensee documented this issue in Condition Report CR-ANO-C-2018-00299.

The inspectors noted that a similar event occurred on August 19, 2016. The D/P on the train B service water pump strainer continued to rise until it reached the threshold at which the performance of an engineering evaluation was required to determine the operability of the B train of service water. This high D/P was attributed to fouling of the strainer caused by pre-screen cleaning activities and delaying the start of the cleaning. Despite this event, the same basic chain of events recurred on January 19, 2018. The inspectors pointed out that the pre-screen design created an inherent risk of spilling debris into the open hole created by lifting the pre-screens. With both trains in a normal alignment, most of the debris would enter both pumps and begin to clog the discharge strainer. The inspectors questioned why this risk was not avoided by proactively aligning one or both trains to the emergency cooling pond. The licensee agreed to study this alternative as a possible corrective action.

Corrective Action(s): The immediate corrective action was to restore operability of the train B service water system and institute a weekly pre-screen cleaning regiment.

Corrective Action Reference(s): Condition Report CR-ANO-C-2018-00299

Performance Assessment:

Performance Deficiency: The licensees failure to properly preplan pre-screen cleaning maintenance that can affect the performance of safety-related equipment is a performance deficiency. As a result, the performance of both trains of the safety-related service water system were challenged, and train B was rendered inoperable.

Screening: The performance deficiency was more than minor because it adversely affected the human performance attribute of the Mitigating Systems Cornerstone and the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the licensees failure to properly preplan pre-screen cleaning maintenance resulted in the train B service water system being rendered inoperable.

Significance: Using NRC Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, Exhibit 2, Mitigating Systems Screening Questions, the inspectors determined that the finding had very low safety significance (Green) because it: was not a design deficiency; did not represent a loss of system and/or function; did not represent an actual loss of function of at least a single train for longer than its technical specification allowed outage time; and did not result in the loss of a high safety-significant, nontechnical specification train.

Cross-cutting Aspect: The finding had a cross-cutting aspect in the area of human performance associated with avoid complacency because the licensee did not plan for the inherent risk with cleaning the pre-screens although cleaning of debris has previously challenged the service water system. Specifically, the licensee did not effectively plan pre-screen cleaning maintenance to avoid system impacts, and did not consider the rate of increase in pre-screen differential pressure due to the winter fish runs in deciding when to start the cleaning.

Enforcement:

Violation: Technical Specification 6.4.1.a requires, in part, that written procedures be established, implemented, and maintained covering the applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978. Section 9.a of Regulatory Guide 1.33, Appendix A, states that maintenance that can affect the performance of safety-related equipment should be properly preplanned and performed in accordance with written procedures, documented instructions, or drawings appropriate to the circumstances.

Contrary to the above, on January 19, 2018, the licensee failed to properly preplan and perform maintenance as prescribed in Regulatory Guide 1.33. Specifically, the licensee failed to preplan the cleaning of Unit 2 service water pre-screens prior to high debris loading of the screens, and failed to place the service water system into an alignment that would have avoided impacting the operability of this safety-related system.

Disposition: This violation is being treated as a non-cited violation, consistent with Section 2.3.2.a of the Enforcement Policy, because it was very low safety significance (Green) and was entered into the licensees corrective action program as Condition Report CR-ANO-C-2018-00299.

Licensee Identified Non-Cited Violation

71124.01 - Radiological Hazard

Assessment and Exposure Controls This violation of very low safety significant (Green) was identified by the licensee and has been entered into the licensee corrective action program and is being treated as a non-cited violation, consistent with Section 2.3.2.a of the Enforcement Policy.

Violation: Title 10 CFR 20.1501(a) requires that each licensee make or cause to be made surveys that may be necessary for the licensee to comply with the regulations in 10 CFR Part 20, and that are reasonable under the circumstances to evaluate the magnitude and extent of radiation levels, concentrations, or quantities of radioactive materials, and the potential radiological hazards that could be present.

Contrary to the above, on August 7, 2017, the licensee failed to make necessary surveys of the Unit 2, 2T-15 tank room, that were reasonable to evaluate the magnitude and extent of radiation levels that could be present. Consequently, workers were allowed access to an area with dose rates up to 1000 millirem per hour at 30 cm without a proper briefing or oversight.

Significance: Using NRC Manual Chapter 0609, Appendix C, Occupational Radiation Safety Significance Determination Process, the inspectors determined the finding to be of very low safety significance (Green) because:

(1) it was not associated with as low as is reasonably achievable (ALARA) planning or work controls;
(2) there was no overexposure;
(3) there was no substantial potential for an overexposure; and
(4) the ability to assess dose was not compromised.

Corrective Action Reference(s): CR-ANO-2-2017-04634 and CR-ANO-2-2017-05337

Unresolved Item (Closed)

Validation of the ANO data collected during the thermal validation test and used in the Holtec analysis.

URI 7200013/2012001-02 60855.1

Description:

During the routine ISFSI inspection conducted on October 29 - November 1, 2012, an unresolved item (URI) was identified and documented in the routine ISFSI NRC Inspection Report 05000313/20120008, 05000368/2012008, and 07200013/2012001 (ADAMS Accession No. ML13057A986).

The Holtec International HI-STORM 100 Certificate of Compliance (CoC) No. 1014, Condition 9, required the performance of a one-time thermal validation test on the first cask that exceeded 20 kW to validate the analytical methods and thermal performance predicted by the licensing basis thermal model as described in Chapter 4 of the Holtec HI-STORM 100 FSAR. ANO was the first general licensee to load a canister exceeding 20 kW and, as such, was required to perform the thermal validation test in accordance with License Condition 9.

During the NRC inspection in 2012, the inspectors identified that ANO had completed the test using instrumentation that had not been controlled or calibrated in accordance with ANOs quality assurance program. The NRC identified this failure to follow the ANOs quality assurance program for the thermal validation test instrumentation as a non-cited violation of 10 CFR 72.164 (NCV 07200013/2012001-01) consistent with Section 2.3.2 of the NRC Enforcement Policy. The validation of the data collected by the instrumentation used during the test was considered indeterminate until the licensee was able to demonstrate that the equipment was properly calibrated by a qualified vender on the licensees approved vendor list. The resolution of this issue was tracked as an unresolved item (URI 07200013/2012001-02).

ANO took corrective actions to verify that the data from the measuring instruments was acceptable by sending the equipment to a qualified lab to verify the equipment was properly calibrated. ANO was able to verify the calibration of the resistance temperature detectors used in the test. The other equipment used in the test were DANTEC LVFA wind tunnel 435-1010 anemometer probes which measured air velocities at very low rates of speed. ANO sent these anemometers to multiple labs including Exelon Labs and National Aeronautics and Space Administration (NASA) for calibration. Unfortunately, none of the labs were able to successfully test the equipment to verify they were properly calibrated, and upon return to ANO, the anemometers were broken in transit. ANO was unable to verify the validity of the data collected during their thermal validation test.

Corrective Action Reference(s): CR-ANO-C-2013-00374, CR-ANO-C-2013-0575, and CR-ANO-C-2013-00576

Closure Basis: Since the ANO staff were unable to validate the data collected for the thermal validation test, as required by CoC License Condition 9, the required test will still need to be performed. However, the NRC has concluded that the wording from CoC License Condition 9 (Amendments 5-9) was not suitable to provide adequate test data to confirm the Holtec thermal analysis as described in the FSAR. The License Condition 9 required measuring air velocity within the annulus area between the canister and the overpack. The data provided in the ANO test was inconsistent and the test requirements listed in the CoC Amendments 5 through 9, License Condition 9, needed to be revised to provide more consistent data that could be utilized by the vendor and the NRC to verify the analytical models from the FSAR.

On May 31, 2016, NRC issued CoC 1014, License Amendment 10, (ADAMS Accession No. ML17237B994) which modified the License Condition 9 thermal validation test to measure air velocity at the inlet vents and not the annulus area between the canister and the overpack.

The first general licensee to load a canister that exceeds 20 kW, under CoC 1014 License Amendment 10, is required to perform the thermal validation test using the new method as described in the license condition. This test will provide sufficient data for the vendor to perform the required analysis and allow the NRC more stable results to review and conclude on the validation of the thermal model as described in the FSAR. A licensee in another region has described their intention of performing the required thermal validation test in the 2018 timeframe.

Unresolved Item (Closed)

Applicability of the ANO thermal validation test results to other HI-STORM 100 overpack configurations.

URI 07200013/2012001-03 60855.1

Description:

On February 3, 2012, Entergy submitted a letter to the NRC informing the agency of the completion of the thermal validation test (discussed above) and the completion of the Holtec analysis (ADAMS Accession No. ML12038A177). On September 14, 2012, Holtec also informed the NRC of the completion of the ANO thermal validation test and provided a copy of Holtec Report HI-2114925 (ADAMS Accession No. ML12264A541) which evaluated the test data. The Holtec report indicated that the thermal model utilized in the licensing-based analysis methodology had predicted an air mass flow rate lower than the values measured in the ANO thermal test and, as such, demonstrated an overall conservatism of the licensing-based methodology, thereby confirming the suitability of the methodology for demonstrating the thermal-hydraulics safety of the HI-STORM 100 cask system and satisfying the requirement of Condition 9.

Holtec issued a statement to the other HI-STORM 100 general licensee users concerning the ANO test on a HI-STORM 100S, Version C, overpack and whether the results could be applied to other cask models of the 100 series. Holtec Licensing Position Paper HL-2011-01 was distributed to Holtec cask users dated August 5, 2011. Holtec concluded that the ANO test data demonstrated the validity of the thermal models, and as such, the results of the ANO test could be applied to any of the HI-STORM 100 overpack configurations. During a meeting on December 18, 2012, between the NRC, ANO, and Holtec, the applicability of the ANO test to the other HI-STORM overpacks was discussed extensively. A number of questions remained as to the sensitivity of the test results to the various configurations of the overpack dimensions and vent sizes. As such, the NRC needed to perform an independent evaluation to confirm Holtecs position. The independent review performed by the NRC was tracked as an unresolved item (URI 07200013/2012001-03).

Corrective Action Reference(s): CR-ANO-C-2013-00374, CR-ANO-C-2013-0575, and CR-ANO-C-2013-00576 Closure Basis: As described above in URI 07200013/2012001-01, the NRC concluded that the wording from CoC License Condition 9 (Amendments 5-9) was not suitable to provide adequate test data to confirm Holtecs thermal methodology. On May 31, 2016, NRC issued CoC 1014 License Amendment 10 (ADAMS Accession No. ML17237B994), which modified the License Condition 9 thermal validation test to measure air velocity at the inlets and not the annulus area between the canister and the overpack. The first general licensee to load a canister that exceeds 20 kW under CoC 1014 License Amendment 10, is required to perform the thermal validation test using the new method as described in the License Condition. Once the new data is collected and analyzed by the general licensee and the vendor, the information will be submitted to the NRC for an independent review.

A general licensee in another region has described their intention of performing the required thermal validation test in the 2018 timeframe.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On January 18, 2018, the inspector presented the results from the routine ISFSI inspection to Ms. S. Pyle, Licensing Manager, and other members of the licensee staff.

On March 30, 2018, the inspector presented the radiation protection inspection results to Mr. R. Anderson, Site Vice President, and other members of the licensee staff.

On April 4, 2018, the inspector presented the quarterly resident inspector inspection results to Mr. J. Kirkpatrick, General Manager of Plant Operations, and other members of the licensee staff.

On April 18, 2018, the inspectors presented the re-exit of the quarterly resident inspector inspection results to Ms. S. Pyle, Regulatory Assurance Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

71111.01 - Adverse Weather Protection

Miscellaneous Documents

Number

Title

Revision

M-2204

Piping & Instrument Diagram, Emergency Feedwater,

Sheet 4

Procedures

Number

Title

Revision

2104.036

Emergency Diesel Generator Operations

2106.006

Emergency Feedwater System Operations

2106.032

Unit Two Freeze Protection Guide

1402.240

Inspection of Watertight Hatches

Condition Reports (CR-ANO-)

C-2018-00050

1-2017-03673

71111.04 - Equipment Alignment

Miscellaneous Documents

Number

Title

Revision

CALC-91-E-

0090-02

ANO-2 EDG Room Ventilation

CALC-91-R-

2013-01

EC-24964

U-2 Emergency Diesel Generator Cycle 20 Heat Exchanger

Thermal Performance Evaluation

EC-45962

2K-4A/B 2013 Emergency Diesel Heat Exchanger Thermal

Performance Test

EC-46332

U-2 Emergency Diesel Generator Thermal Performance

Test Review 2011

EC-52442

2014 2K-4A/B Thermal Performance Evaluation

EC-66265

U-2 SW Strainer D/P Spike Op Input

ER-ANO-2006-

248-000

GL-89-13

SW System Problems Affecting Safety-Related Equipment

Miscellaneous Documents

Number

Title

Revision

M-2204

Piping & Instrument Diagram, Emergency Feedwater,

Sheet 4

M-2210

Piping & Instrument Diagram, Service Water, Sheet 1 - 4

STM-2-42

SW and ACW Systems

Procedures

Number

Title

Revision

1403.191

Motor Testing Using MCE/EMAX

11, 12

2104.029

Service Water System Operations

109

2104.036

Emergency Diesel Generator Operations

2104.044

Ventilation System Operations

2106.006

Emergency Feedwater System Operations

Condition Reports (CR-ANO-)

1-2013-03239

1-2016-05663

1-2016-05675

1-2016-05676

1-2017-00186

1-2018-00132

2-2012-00762

2-2015-02748

2-2015-02879

2-2015-05329

2-2016-00035

2-2016-00550

2-2016-02987

2-2016-03206

2-2016-03918

2-2016-04462

2-2017-05291

2-2017-05919

2-2018-00157

2-2018-00165

2-2018-00168

C-2013-03165

C-2016-05226

C-2016-05445

C-2017-04059

C-2017-04069

C-2017-04775

C-2018-00277

C-2018-00441

Work Orders

2537116

2728726

497922-01

71111.05 - Fire Protection

Miscellaneous Documents

Number

Title

Revision/Date

Pre-Drill Brief - ASOTH-FP-FBDRLS

EC-52999

Justification for Additional Non-Q Battery Room Heating

Miscellaneous Documents

Number

Title

Revision/Date

ER-ANO-2002-

0145-00

Justification for Temporary Non-Q Battery Room Heating

January 30,

2002

FBDRL-2018-03

Fire Drill

March 9,

2018

Procedures

Number

Title

Revision

2106.032

Unit Two Freeze Protection Guide

71111.06 - Flood Protection Measures

Drawings

Number

Title

Revision

E-601

Electrical Plot Plan Outdoor Area, Sheet 1

1402.240

Inspection of Watertight Hatches

Work Orders

2747174

71111.11 - Licensed Operator Requalification Program and Licensed Operator

Performance

Procedures

Number

Title

Revision

OP-2202.001

Standard Post Trip Actions

OP-2202.002

Reactor Trip Recovery

OP-2203.009

Fire Protection System Annunciator Corrective Actions

OP-2203.025

RCP Emergencies

OP-2203.034

Fire or Explosion

71111.12 - Maintenance Effectiveness

Drawings

Number

Title

234C7880F

Induction Motor

Miscellaneous Documents

Number

Title

Revision

117

Engineering Evaluation, SW Pumps

2015

U-2 SW System Health Report Q1, Q2, Q3, Q4

2016

U-2 SW System Health Report Q1, Q2, Q4

2017

U-2 SW System Health Report Q2

EC-28463

SW System

N 1000.006-P

E-Doc, SW System Ops

TDG080 1710

Triclad Vertical Induction Motors

Procedures

Number

Title

Revision

1304.125

Unit 1 RPS-A/CRD Breaker Trip Test

1309.013

Flow Rate Data

2104.029

SW System Ops

109

203.022

Loss of SW Tech Guidelines

2311.002

Flow Rate Data

2411.102

U-2 Slide Gate and SW Bay Cleaning/Inspection

EN-DC-204

Maintenance Rule Scope and Basis

EN-DC-205

Maintenance Rule Monitoring

EN-FAP-OM-012 Prompt Investigation and Notifications, Attn. 7.4

EN-LI-118

ANO Response to Cold Weather Shad Runs

1402.240

Inspection of Watertight Hatches

Condition Reports (CR-ANO-)

1-2017-00965

2-2014-02814

2-2015-00083

2-2015-00129

2-2015-00268

2-2016-01808

2-2016-02351

2-2016-02611

2-2017-01162

2-2017-05280

2-2017-05281

2-2017-05329

2-2017-05759

2-2018-00044

2-2018-00045

2-2018-00157

2-2018-00300

2-2018-00445

2-2018-00797

C-2017-00287

C-2018-00299

C-2018-01623

1-2017-03673

Work Orders

189034

435369

453805

468095

486027

489032

51803722

2652306

2711156

2713201

2715932

2728009

2766896

2784316

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Miscellaneous Documents

Number

Title

Revision

COPD-024

Risk Assessment Actions

Procedures

Number

Title

Revision

1107.001

Electrical System Operations

115

2104.029

Service Water System Operations

109

203.003

CEA Malfunction

EN-FAP-OM-021 Critical Decision Procedure

EN-OP-119

Protected Equipment Postings

EN-WM-104

On Line Risk Assessment

Condition Reports (CR-ANO-)

C-2018-00474

C-2018-00475

Work Orders

490410

71111.15 - Operability Determinations and Functionality Assessments

Drawings

Number

Title

A2001S01

ANO 500/161KV SW STA Station One-Line In-Service

Diagram

E-2100

Schematic Diagram Diesel Generator 2K4A ACB 152-308

E-2276

Schematic Diagram Service Water Pump 2P4B

E-2361

Schematic Diagram Containment Cooling 2VSF1A

E-2361

Schematic Diagram Containment Cooling 2VSF1B

Miscellaneous Documents

Number

Title

Date

00-R-2011-01

Calculation

OPS-152A

SU1 Outage Checklist - Unit 1 - 72-Hour TC

August 29,

2013

OPS-152B

SU3 Outage Checklist - Unit 2 - 72-Hour TC

August 29,

2013

Procedures

Number

Title

Revision

1106.006

Emergency Feedwater Pump Operation

100, 101, 102

Condition Reports (CR-ANO-)

1-2000-00068

1-2017-01820

1-2018-00086

2-2000-00074

2-2018-00055

2-2018-00065

2-2018-00088

C-2018-00389

C-2018-00474

C-2018-00475

Work Orders

490410-16

71111.18 - Plant Modifications

Miscellaneous Documents

Number

Title

Revision/Date

CALC-86E-0020-

1E Station Battery 2D11 Duty Cycle and Sizing Calculation

EC-52999

Justification for Additional Non-Q Battery Room Heating

ER-ANO-2002-

0145-00

Justification for Temporary Non-Q Battery Room Heating

January 30,

2002

STM 2-32-5

25 VDC Electrical Distribution

Procedures

Number

Title

Revision

2106.032

Unit Two Freeze Protection Guide

Condition Reports (CR-ANO-)

2-2003-00041

2-2014-00345

Work Orders

490646

71111.19 - Post-Maintenance Testing

Procedures

Number

Title

Revision

2304.237

Post Maintenance Verification

Condition Reports (CR-ANO-)

1-2018-01107

2-2018-00356

Work Orders

494916

71111.22 - Surveillance Testing

Miscellaneous Documents

Number

Title

Revision/Date

CALC-95-R-

0014-02-01

MWO50235000

MWO50235239

MWO50235641

OPS-152A

SU1 Outage Checklist - Unit 1 - 72-Hour TC

August 29,

2013

OPS-152B

SU3 Outage Checklist - Unit 2 - 72-Hour TC

August 29,

2013

SEP-ANO-1-

IST-1

ANO-1 Inservice Testing Basis Document

Procedures

Number

Title

Revision

1104.209

SW Pump Performance Curves

Procedures

Number

Title

Revision

1106.006

Emergency Feedwater Pump Operation

100, 101, 102

1107.001A

Unit 1 XFMR Outage Checklist

115

1304.125

Unit 1 RPS-A/CRD Breaker Trip Test

2104.029

SW Pump Performance Curves

Condition Reports (CR-ANO-)

1-2009-01820

1-2017-00965

1-2018-00086

1-2018-00631

2-2017-05885

C-2018-00474

Work Orders

2747144

71124.01 - Radiological Hazard Assessment and Exposure Controls

Air Sample Surveys

Number

Title

Date

AS-ANO-2018-

04648

RAB 10 - P36 A Makeup Pump Tear Down

March 2,

2018

AS-ANO-2018-

04660

RAB 11 - AMS-4 Alarm

March 7,

2018

AS-ANO-2018-

04665

RAB 121 - Replace 2RE - 8221-2 Blower Pump UNPR

March 9,

2018

Audits and Self-Assessments

Number

Title

Date

LO-ALO-2017-

00025

Self-Assessment: Radiation Safety - Hazard Assessment

and Airborne Controls

March 22,

2017

QA-14/15-2017-

ANO-01

Combined Radiation Protection and Radwaste

November 6,

2017

Miscellaneous Documents

Number

Title

Date

NSTS Annual Inventory Reconciliation Report

January 11,

2018

ANO Alpha Hazard Evaluation

May 3, 2017

Miscellaneous Documents

Number

Title

Date

ANO-2017-0067

Spent Fuel Pool Inventory - Non-Fuel Items

August 22,

2017

ANO-2017-0093

2017 Radiation Energy Distribution Evaluation

December 7,

2017

2742701

Annual Inventory of Non-Installed Radioactive Sources

February 20,

2018

2745968

Semi Annual Leak Test of Sealed Sources

February 15,

2018

Procedures

Number

Title

Revision

EN-RP-100

Radiation Worker Expectations

EN-RP-101

Access Control for Radiologically Controlled Areas

EN-RP-102

Radiological Control

EN-RP-104

Personnel Contamination Events

EN-RP-105

Radiological Work Permits

EN-RP-106

Radiological Survey Documentation

EN-RP-108

Radiation Protection Posting

EN-RP-109

Hot Spot Program

EN-RP-121

Radioactive Material Control

EN-RP-123

Radiological Controls for Highly Radioactive Objects

EN-RP-143

Source Control

EN-RP-152

Conduct of Radiation Protection

Radiation Surveys

Number

Title

Date

1609-0457

U1 AUX 335 EL - F3A/F3B Filter Rooms

September

19, 2016

1703-0336

U1 AUX Bldg - T-15 Tank Room

March 14,

2017

1801-0490

U1 AUX 335 EL F2 Seal Injection Filter Room

January 31,

2018

1802-0204

Semi Annual Source Leak Test

February 14,

2018

Radiation Work Permits

Number

Title

Revision

20181401

Radiation Protection Activities During 1R27

20181407

Decontamination Activities During !R27 (Bulk Work)

20181412

1R27 Locked High Radiation Area Activities (Bulk Work)

20181425

RCP Motor Maintenance During 1R27

20181430

Reactor Disassembly/Re-Assembly, and Support Activities

20181432

De-Fuel & Re-Fuel the Reactor

20182053

Spent Fuel Activities - Unit 2

Condition Reports (CR-ANO-)

1-2018-00585

1-2018-00997

1-2018-01273

2-2017-01634

2-2017-04273

2-2017-04634

2-2017-05337

2-2017-06115

C-2017-00890

C-2017-00946

C-2017-01105

C-2017-03822

C-2017-03929

C-2018-01264

Fleet Condition Reports (CR-HQN-)

2017-00179

2017-00848

2017-00974

71124.02 - Occupational ALARA Planning and Controls

ALARA Planning, In-Progress Reviews, and Post-Job Reviews

Number

Title

Date

20171070

Core Bore NFPA 805 Project and Support Activities

March 6,

2018

20181070

Core Bore NFPA 805 Project and Support Activities

March 5,

2018

20181430

Reactor Disassembly, Reassembly, and Support Activities

June 17,

2017

Audits and Self-Assessments

Number

Title

Date

LO-ALO-2017-

00023

Self-Assessment: Radiation Safety - ALARA & Dose

Assessment

September

11, 2017

QA-14/15-2017-

ANO-01

Quality Assurance Audit: Combined Radiation Protection

and Radwaste

November 6,

2017

Miscellaneous Documents

Number

Title

Date

Letdown Heat Exchanger (E-29A/B) Flush Plan

March 28,

2018

TSR 18-1-063

Letdown Heat Exchangers, E-29A and E-29B

December 7,

2017

TSR 18-1-064

RBD-11A & RBD-12A / Makeup System

December 7,

2017

TSR 18-1-123

Letdown Cooler E-29A&B Inlet/Outlet Isolation

December 7,

2017

Procedures

Number

Title

Revision

EN-RP-105

Radiological Work Permits

EN-RP-110

ALARA Program

EN-RP-110-03

Collective Radiation Exposure Guidelines

EN-RP-110-04

Radiation Protection Risk Assessment Process

EN-RP-110-06

Outage Dose Estimating and Tracking

Radiation Work Permits

Number

Title

Revision

20171070

Core Bore NFPA 805 Project and Support Activities

20181070

Core Bore NFPA 805 Project and Support Activities

20181401

Radiation Protection Activities During 1R27

20181414

ALARA Activities During 1R27

20181420

Scaffold Installation / Removal Non-LHRAs - 1R27

20181430

Reactor Disassembly, Reassembly, and Support Activities

20181900

Emergent Maintenance Activities During 1R27

Condition Reports (CR-ANO-)

1-2018-00336

1-2018-00508

1-2018-00849

2-2017-05526

C-2017-04230

C-2017-04551

C-2017-04692

C-2018-00851

Fleet Condition Reports (CR-HQN-)

2017-01791

71151 - Performance Indicator Verification

Procedures

Number

Title

Revision

EN-LI-114

Regulatory Performance Indicator Process

7, 8

71152 - Problem Identification and Resolution

Miscellaneous Documents

Number

Title

Revision

EC-66265

U-2 SW Strainer D/P Spike Op Input

ER-ANO-2006-

248-000

GL-89-13

SW System Problems Affecting Safety-Related Equipment

Condition Reports (CR-ANO-)

1-2013-03239

1-2016-05663

1-2016-05675

1-2016-05676

1-2017-00186

1-2018-00132

2-2012-00762

2-2015-02748

2-2015-02879

2-2015-05329

2-2016-00035

2-2016-00550

2-2016-02987

2-2016-03206

2-2016-03918

2-2016-04462

2-2017-05291

2-2017-05919

2-2018-00157

2-2018-00165

2-2018-00168

C-2013-03165

C-2016-05226

C-2016-05445

C-2017-04059

C-2017-04069

C-2017-04775

C-2018-00277

C-2018-00441

C-2018-0299

71153 - Follow-up of Events and Notices of Enforcement Discretion

Miscellaneous Documents

Number

Title

CALC-16-E-

0017-01

Tornado Missile Shield for Door 77, Room 144

EC 67019

Door 77, room 144 Tornado Generated Missile Barrier

ECN 73255

Resolution of Rebar Interferences for DR-77 Missile Barrier

Miscellaneous Documents

Number

Title

LER

05000313/2016-

2-00

Tornado Missile Vulnerability Resulting in Condition

Prohibited By Technical Specifications

Condition Reports (CR-ANO-)

1-2016-01788

Other Activities

Design Basis Documents

Number

Title

Revision/Date

2.212

2.212 Report for ANO ISFSI

Area-TLD Report Review of 2014 Area Monitoring Results (1st/2nd half)

February

2015

Area-TLD Report Review of 2015 Area Monitoring Results (1st/2nd half)

February

2016

Area-TLD Report Review of 2016 Area Monitoring Results (1st/2nd half)

February

2017

CoC 1014

CoC and Technical Specifications for HI-STORM 100

Amendment 5

ISFSI FSAR

HI-STORM 100 ISFSI Final Safety Analysis Report

LTR-PAR-17-081 Evaluation of XSAM Periodic Test ANO, Two Block

November 20,

2017

WTHQN-2015-

277

Surveillance Activity Report

April 15, 2015

WTHQN-2015-

605

Surveillance Activity Report

April 15, 2015

WTHQN-2016-

774

Surveillance Activity Report

December 9,

2016

Miscellaneous Documents

Number

Title

Date

ANO-1708-0273

Survey of Dry Fuel Pad

August 16,

2017

ANO-1708-0279

Survey of CTF Dry Fuel Storage Pad

August 16,

2017

Miscellaneous Documents

Number

Title

Date

WTHQN-2016-

775

Surveillance Activity Report

December 9,

2016

WTHQN-2016-

776

Surveillance Activity Report

February 16,

2016

WTHQN-2016-

777

Surveillance Activity Report

December

15, 2016

WTHQN-2017-

111

Surveillance Activity Report

January 25,

2017

WTHQN-2017-

2

Surveillance Activity Report

April 27, 2017

WTHQN-2017-

453

Surveillance Activity Report

June 9, 2017

Procedures

Number

Title

Revision

1015.003B

Unit Two Operations Logs

EDR-1

Generic Licensing Topical Report for L-3 Crane

EN-DC-215

Fuel Selection for Holtec Dry Cask Storage for Canisters 48

through 57

EN-LI-100

Process Applicability Determination

EN-LI-101

CFR 50.59 Evaluations

EN-LI-112

CFR 72.48 Evaluations

EN-LI-115

HI-STORM 100 ISFSI Licensing Document Preparation and

Control

EN-RP-210

Area Monitoring Program

OP-3403.004

HI-STORM 100 System Equipment Preparation

OP-3403.005

HI-STORM 100 System Loading Operations

OP-3403.008

HI-TRAC and MPC Preparations for Fuel Loading

OP-3403.009

MPC Receipt Inspections

OP-3403.010

HI-STORM Overpack Receipt Inspections

OP-3406.005

Hi-STORM and HI-TRAC Transport Operations

OP-3406.006

Forced Helium Dehydration System Operations

OP-3406.007

Supplemental Cooling System Operations

2.48 Evaluations

Number

Title

Date

DFS-15-001

2.48 Evaluation, Foreign Material

December

2, 2015

DFS-16-001

2.48 Evaluation, Application of Concrete Sealant

January 21,

2016

Condition Reports (CR-ANO-)

1-2017-3441

1-2017-3445

1-2017-3447

1-2017-3448

1.2017-3449

1.2017-3450

1-2017-3451

1-2017-3538

1-2017-3540

1-2017-3541

1-2017-3555

1-2016-0403

2-2015-2420

2-2016-0359

2-2016-2071

C-2015-0849

C-2015-0918

C-2015-0969

C-2015-1185

C-2015-2297

C-2015-2765

C-2015-3387

C-2015-4664

C-2015-4693

C-2015-4905

C-2015-4971

C-2016-0038

C-2016-0834

C-2016-0848

C-2016-1344

C-2016-2844

C-2016-3647

C-2016-4458

C-2017-2506

C-2017-2850

Engineering Changes

EC-15295

EC-37094

EC-42379

EC-45077

EC-48646

EC-48806

EC-52044

EC-52619

EC-54103

EC-59072

EC-63881

EC-73641

Work Orders

00065585

00408695

00419603

00439666

00479654

00488244

00489244

2393253

2576506

2629825

2629826

2638961

2663017

2667631

2687172

2687173

2701892

2707684

2719037

The following items are requested for the

Occupational Radiation Safety Inspection

Arkansas Nuclear One

March 26 thru 30, 2018

Integrated Report 2018001

Inspection areas are listed in the attachments below.

Please provide the requested information on or before March 9, 2018.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled

1-A, applicable organization charts in file/folder 1-B, etc.

If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at

least 30 days later than the on-site inspection dates, so the inspectors will have access to the

information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Natasha Greene at (817) 200-1154 or

natasha.greene@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

1.

Radiological Hazard Assessment and Exposure Controls (71124.01) and

Performance Indicator Verification (71151)

Date of Last Inspection:

April 10, 2017

A.

List of contacts and telephone numbers for the Radiation Protection Organization Staff

and Technicians

B.

Applicable organization charts

C.

Audits, self-assessments, and LERs written since date of last inspection, related to this

inspection area

D.

Procedure indexes for the radiation protection procedures

E.

Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures may be requested by number after the inspector reviews

the procedure indexes.

1. Radiation Protection Program Description

2. Radiation Protection Conduct of Operations

3. Personnel Dosimetry Program

4. Posting of Radiological Areas

5. High Radiation Area Controls

6. RCA Access Controls and Radiation Worker Instructions

7. Conduct of Radiological Surveys

8. Radioactive Source Inventory and Control

9. Declared Pregnant Worker Program

F.

List of corrective action documents (including corporate and sub-tiered systems) since

date of last inspection

a. Initiated by the radiation protection organization

b. Assigned to the radiation protection organization

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

If not covered above, a summary of corrective action documents since date of last

inspection involving unmonitored releases, unplanned releases, or releases in which any

dose limit or administrative dose limit was exceeded (for Public Radiation Safety

Performance Indicator verification in accordance with IP 71151)

G.

List of radiologically significant work activities scheduled to be conducted during the

inspection period (If the inspection is scheduled during an outage, please also include a

list of work activities greater than 1 rem, scheduled during the outage with the dose

estimate for the work activity.)

H.

List of active radiation work permits

I.

Radioactive source inventory list

a.

All radioactive sources that are required to be leak tested

b.

All radioactive sources that meet the 10 CFR Part 20, Appendix E, Category 2

and above threshold. Please indicate the radioisotope, initial and current activity

(w/assay date), and storage location for each applicable source.

J.

The last two leak test results for the radioactive sources inventoried and required to be

leak tested. If applicable, specifically provide a list of all radioactive source(s) that have

failed its leak test within the last two years

K.

A current listing of any non-fuel items stored within your pools, and if available, their

appropriate dose rates (Contact / @ 30cm)

L.

Computer printout of radiological controlled area entries greater than 100 millirem since

the previous inspection to the current inspection entrance date. The printout should

include the date of entry, some form of worker identification, the radiation work permit

used by the worker, dose accrued by the worker, and the electronic dosimeter dose

alarm set-point used during the entry (for Occupational Radiation Safety Performance

Indicator verification in accordance with IP 71151).

2.

Occupational ALARA Planning and Controls (71124.02)

Date of Last Inspection:

November 6, 2017

A.

List of contacts and telephone numbers for ALARA program personnel

B.

Applicable organization charts

C.

Copies of audits, self-assessments, and LERs, written since date of last inspection,

focusing on ALARA

D.

Procedure index for ALARA Program

E.

Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures may be requested by number after the inspector reviews

the procedure indexes.

1. ALARA Program

2. ALARA Committee

3. Radiation Work Permit Preparation

F.

A summary list of corrective action documents (including corporate and sub-tiered

systems) written since date of last inspection, related to the ALARA program. In addition

to ALARA, the summary should also address Radiation Work Permit violations,

Electronic Dosimeter Alarms, and RWP Dose Estimates

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

List of work activities greater than 1 rem, since date of last inspection,

Include original dose estimate and actual dose.

H.

Site dose totals and 3-year rolling averages for the past 3 years (based on dose of

record)

I.

Outline of source term reduction strategy

J.

If available, provide a copy of the ALARA outage report for the most recently completed

outages for each unit

K.

Please provide your most recent Annual ALARA Report.

ML18120A214

SUNSI Review

By: NFO/rdr

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

Keyword:

NRC-002

OFFICE

SPE:DRP/E

C:DRP/E

NAME

JDixon

NOKeefe

SIGNATURE

/RA/

/RA/

DATE

4/30/18

4/30/18