{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
                                  NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
                                                REGION II
REGION II  
                            245 PEACHTREE CENTER AVENUE NE, SUITE 1200
245 PEACHTREE CENTER AVENUE NE, SUITE 1200  
                                      ATLANTA, GEORGIA 30303-1257
ATLANTA, GEORGIA 30303-1257  
                                            August 3, 2015
David A. Heacock
August 3, 2015  
Virginia Electric & Power Company
Innsbrook Technical Center
5000 Dominion Blvd.
David A. Heacock  
Glen Allen, VA 23060-6711
Virginia Electric & Power Company  
SUBJECT:           NORTH ANNA NUCLEAR PLANT (UNIT 1 AND 2) - NOTIFICATION OF A
Innsbrook Technical Center  
                  TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION
5000 Dominion Blvd.  
                  REPORT NOS. 05000338/2015008 AND 05000339/2015008)
Glen Allen, VA 23060-6711  
Dear Mr. Heacock:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
staff will conduct a triennial fire protection baseline inspection at North Anna Nuclear Plant,
SUBJECT:  
Units 1 and 2. The inspection team will be led by David Jones, a Senior Reactor Inspector from
NORTH ANNA NUCLEAR PLANT (UNIT 1 AND 2) - NOTIFICATION OF A  
the NRC Region II Office. The team will be composed of personnel from the NRC Region II
TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION  
Office. The inspection will be conducted in accordance with IP 71111.05T, the NRC's baseline
REPORT NOS. 05000338/2015008 AND 05000339/2015008)  
fire protection inspection procedure, dated January 31, 2013.
On July 16, 2015, during a telephone conversation between Mr. J. Leberstien, Licensing, and
Dear Mr. Heacock:  
Mr. D. Jones of our respective staffs confirmed arrangements for an information gathering
onsite visit and a two-week onsite inspection. The schedule for the inspection is as follows:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)  
        *   Information Gathering Visit:       September 14 - 18, 2015
staff will conduct a triennial fire protection baseline inspection at North Anna Nuclear Plant,  
        *   Week 1 of onsite inspection:       October 19 - 23, 2015
Units 1 and 2. The inspection team will be led by David Jones, a Senior Reactor Inspector from  
        *   Week 2 of onsite inspection:       November 02 - 06, 2015
the NRC Region II Office. The team will be composed of personnel from the NRC Region II  
The purposes of the information gathering visit are to obtain information and documentation
Office. The inspection will be conducted in accordance with IP 71111.05T, the NRC's baseline  
needed to support the inspection, to become familiar with the North Anna Nuclear Plant fire
fire protection inspection procedure, dated January 31, 2013.  
protection program, fire protection features, post-fire safe shutdown capabilities, plant layout,
mitigating strategies to address Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)
On July 16, 2015, during a telephone conversation between Mr. J. Leberstien, Licensing, and  
(2); and, as necessary, obtain plant specific site access training and badging for unescorted site
Mr. D. Jones of our respective staffs confirmed arrangements for an information gathering  
access.
onsite visit and a two-week onsite inspection. The schedule for the inspection is as follows:
An initial list of the documents the team will review during the conduct of the inspection is listed
in Enclosures 1 and 2. The team leader will contact you with any additional specific document
*  
requests prior to the information gathering visit.
Information Gathering Visit:  
September 14 - 18, 2015
*  
Week 1 of onsite inspection:  
October 19 - 23, 2015
*  
Week 2 of onsite inspection:  
November 02 - 06, 2015  
The purposes of the information gathering visit are to obtain information and documentation  
needed to support the inspection, to become familiar with the North Anna Nuclear Plant fire  
protection program, fire protection features, post-fire safe shutdown capabilities, plant layout,  
mitigating strategies to address Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)  
(2); and, as necessary, obtain plant specific site access training and badging for unescorted site  
access.
An initial list of the documents the team will review during the conduct of the inspection is listed  
in Enclosures 1 and 2. The team leader will contact you with any additional specific document  
requests prior to the information gathering visit.  


D. Heacock                                     2
D. Heacock  
During the information gathering visit, the team will also discuss the following inspection support
2  
administrative details: office space size and location; specific documents requested to be made
available to the team in their office spaces; arrangements for reactor site access (including
During the information gathering visit, the team will also discuss the following inspection support  
radiation protection training, security, safety and fitness for duty requirements); and the
administrative details: office space size and location; specific documents requested to be made  
availability of knowledgeable plant staff and licensing organization personnel to serve as points
available to the team in their office spaces; arrangements for reactor site access (including  
of contact during the inspection.
radiation protection training, security, safety and fitness for duty requirements); and the  
We request that during the on-site inspection weeks you ensure that copies of analyses,
availability of knowledgeable plant staff and licensing organization personnel to serve as points  
evaluations or documentation regarding the implementation and maintenance of the station fire
of contact during the inspection.
protection program, including post-fire safe shutdown capability, be readily accessible to the
team for their review. Of specific interest for the fire protection portion of the inspection are
We request that during the on-site inspection weeks you ensure that copies of analyses,  
those documents which establish that your fire protection program satisfies NRC regulatory
evaluations or documentation regarding the implementation and maintenance of the station fire  
requirements and conforms to applicable NRC and industry fire protection guidance (i.e., fire
protection program, including post-fire safe shutdown capability, be readily accessible to the  
protection compliance assessment documents). For the 10 CFR 50.54(hh) (2) portion of the
team for their review. Of specific interest for the fire protection portion of the inspection are  
inspection, those documents implementing your mitigating strategies and demonstrating the
those documents which establish that your fire protection program satisfies NRC regulatory  
management of your commitments for the strategies are of specific interest. Also, personnel
requirements and conforms to applicable NRC and industry fire protection guidance (i.e., fire  
should be available at the site during the inspection that is knowledgeable regarding those plant
protection compliance assessment documents). For the 10 CFR 50.54(hh) (2) portion of the  
systems required to achieve and maintain safe shutdown conditions from inside and outside the
inspection, those documents implementing your mitigating strategies and demonstrating the  
control room, including the electrical aspects of the relevant post-fire safe shutdown analyses,
management of your commitments for the strategies are of specific interest. Also, personnel  
reactor plant fire protection systems and features, and the station fire protection program and its
should be available at the site during the inspection that is knowledgeable regarding those plant  
implementation.
systems required to achieve and maintain safe shutdown conditions from inside and outside the  
This letter does not contain new or amended information collection requirements subject to the
control room, including the electrical aspects of the relevant post-fire safe shutdown analyses,  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
reactor plant fire protection systems and features, and the station fire protection program and its  
requirements were approved by the Office of Management and Budget, under control number
implementation.
3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
This letter does not contain new or amended information collection requirements subject to the  
request for information or an information collection requirement unless the requesting document
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
displays a currently valid Office of Management and Budget control number.
requirements were approved by the Office of Management and Budget, under control number  
In accordance with 10 CFR 2.390 of the NRC Rules and Practices, a copy of this letter and its
3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a  
enclosures will be available electronically for public inspection in the NRC Public Document
request for information or an information collection requirement unless the requesting document  
Room or from the Publically Available Records (PARS) component of NRCs document system
displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC Rules and Practices, a copy of this letter and its  
enclosures will be available electronically for public inspection in the NRC Public Document  
Room or from the Publically Available Records (PARS) component of NRCs document system  
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.hmtl (the Public Electronic Reading Room).
rm/adams.hmtl (the Public Electronic Reading Room).


D. Heacock                                   3
D. Heacock  
Your cooperation and support during this inspection will be appreciated. If you have questions
3  
concerning this inspection, or the inspection team's information or logistical needs, please
contact David Jones, the team leader, in the Region II Office at 404-997-4631 or me at
Your cooperation and support during this inspection will be appreciated. If you have questions  
404-997-4521.
concerning this inspection, or the inspection team's information or logistical needs, please  
                                              Sincerely,
contact David Jones, the team leader, in the Region II Office at 404-997-4631 or me at
                                              /RA/
404-997-4521.  
                                              Scott M. Shaeffer, Chief
                                              Engineering Branch 2
Sincerely,  
                                              Division of Reactor Safety
Docket Nos.: 50-338; 50-339
License No.: DPR-32 and DPR-37
Enclosures:
1. Triennial Fire Protection Inspection Supporting Documentation
2. Mitigating Strategies Supporting Documentation
cc: Distribution via Listserv
/RA/  
Scott M. Shaeffer, Chief  
Engineering Branch 2  
Division of Reactor Safety  
Docket Nos.: 50-338; 50-339  
License No.: DPR-32 and DPR-37  
Enclosures:
1. Triennial Fire Protection Inspection Supporting Documentation
2. Mitigating Strategies Supporting Documentation
cc: Distribution via Listserv




_________________________               SUNSI REVIEW COMPLETE   FORM 665 ATTACHED
_________________________  
OFFICE             RII:DRS       RII:DRS
SIGNATURE         DAJ2         SMS
SUNSI REVIEW COMPLETE  
NAME               DJONES       SSHAEFFER
FORM 665 ATTACHED  
DATE                   8/3/2015     8/3/2015     8/ /2015       8/ /2015     8/ /2015     8/ /2015     8/ /2015
OFFICE  
E-MAIL COPY?         YES     NO  YES     NO  YES   NO     YES   NO    YES   NO    YES    NO    YES     NO
RII:DRS  
       
RII:DRS  
Letter to David A. Heacock from Scott M Shaeffer dated August 3, 2015.
SUBJECT:       NORTH ANNA NUCLEAR PLANT (UNIT 1 AND 2) - NOTIFICATION OF A
              TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION
              REPORT NOS. 05000338/2015008 AND 05000339/2015008)
DISTRIBUTION:
RIDSNRRDIRS
SIGNATURE  
PUBLIC
DAJ2  
RidsNrrPMNorth Anna Resource
SMS  
NAME  
DJONES  
SSHAEFFER  
DATE  
8/3/2015  
8/3/2015  
8/   /2015  
8/   /2015  
8/   /2015  
8/   /2015  
8/   /2015  
E-MAIL COPY?  
     YES  
NO    
   YES  
NO       YES  
NO     
  YES  
NO     
  YES  
NO      YES
NO   
  YES
NO   


                  Triennial Fire Protection Inspection Supporting Documentation
The documents and information requested below should generally be made available to the
Letter to David A. Heacock from Scott M Shaeffer dated August 3, 2015.  
inspection team during the on-site information gathering visit for the team's use both on-site and
off-site during the inspection. Electronic format is the preferred media, except where specifically
SUBJECT:  
noted, if readily available (The preferred file format is searchable .pdf files). If electronic media
NORTH ANNA NUCLEAR PLANT (UNIT 1 AND 2) - NOTIFICATION OF A  
is made available via an internet based remote document management system, then the remote
TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION
document access must allow inspectors to download, save, and print the documents in the
REPORT NOS. 05000338/2015008 AND 05000339/2015008)
NRC's regional office. Electronic media on compact disc or paper records (hard copy) are
acceptable. At the end of the inspection, the documents in the team's possession will not be
DISTRIBUTION:  
retained.
RIDSNRRDIRS
Approximately three weeks before the on-site information gathering visit, the following
PUBLIC
documents should be made available to the team leader for review in the regional office:
RidsNrrPMNorth Anna Resource
    *  Post-fire Safe Shutdown or Alternative Shutdown Analysis (request A.1)
    *  Fire Hazards Analysis (request A.2)
    *  Individual Plant Examination for External Events (Fire Chapter ONLY) (request A.3)
Based on review of the above three documents, the team leader will identify a preliminary list of
fire areas being considered for inspection prior to the on-site information gathering visit. During
the information gathering visit, or shortly thereafter, the fire areas selected for inspection will be
determined.
This document request is based on typical documents that a generic plant might have. As such,
this generic document request is not meant to imply that any specific plant is required to have all
of the listed documents. It is recognized that some documents listed below may not be
available for your plant. In addition, the document titles listed below are based on typical
industry document names; your plant specific document titles may vary.
A.    DESIGN AND LICENSING BASIS DOCUMENTS
      A.1  Post-fire Safe Shutdown or Alternative Shutdown Analysis.
      A.2  Fire Hazards Analysis.
      A.3  Individual Plant Examination for External Events (IPEEE) (Fire Chapter ONLY),
            including:
            * Results of any post-IPEEE reviews; and
            * LIST of actions taken or plant modifications performed in response to the IPEEE
              results.
      A.4  Fire Protection Program and/or Fire Protection Plan.
                                                                                            Enclosure 1


                                                  2
  A.5 LIST of post-fire safe shutdown or alternative shutdown systems (i.e., safe shutdown
Enclosure 1
        equipment list).
Triennial Fire Protection Inspection Supporting Documentation
  A.6 Fire Protection System Design Basis Document.
  A.7 Post-fire Safe Shutdown or Alternative Shutdown Design Basis Document.
  A.8  LIST of applicable NFPA codes and standards and issuance dates (i.e., codes of
The documents and information requested below should generally be made available to the
        record).
inspection team during the on-site information gathering visit for the team's use both on-site and
  A.9 LIST of deviations from NFPA codes of record.
off-site during the inspectionElectronic format is the preferred media, except where specifically
  A.10 NFPA Compliance Review Report.
noted, if readily available (The preferred file format is searchable .pdf files). If electronic media
  A.11 Report or evaluation that compares the fire protection program to the NRC Branch
is made available via an internet based remote document management system, then the remote
        Technical Position (BTP) 9.5-1 Appendix A.
document access must allow inspectors to download, save, and print the documents in the
  A.12 Electronic copy of licensee submittals and NRC safety evaluation reports that are
NRC's regional office.  Electronic media on compact disc or paper records (hard copy) are
        specifically listed in the facility operating license for the approved fire protection
acceptable. At the end of the inspection, the documents in the team's possession will not be
        program.
retained.  
  A.13 NRC Safety Evaluation Reports for fire protection program and post-fire safe
   
        shutdown or alternative shutdown features.
Approximately three weeks before the on-site information gathering visit, the following
  A.14 NRC approved exemptions for plant fire protection and post-fire safe shutdown or
documents should be made available to the team leader for review in the regional office:
        alternative shutdown features.
   
  A.15 Exemption requests submitted but not yet approved for plant fire protection and post-
*
        fire safe shutdown or alternative shutdown features.
Post-fire Safe Shutdown or Alternative Shutdown Analysis (request A.1)
  A.16 Facility Operating License (electronic format only).
*
  A.17 Technical Specifications (electronic format only).
Fire Hazards Analysis (request A.2)
  A.18 Technical Requirements Manual (electronic format only).
*
  A.19 Updated Final Safety Analysis Report (electronic format only).
Individual Plant Examination for External Events (Fire Chapter ONLY) (request A.3)  
B. GENERAL PLANT DESIGN DOCUMENTS
   
  B.1 Piping and instrumentation diagrams (P&IDs) and legend list for post-fire safe
Based on review of the above three documents, the team leader will identify a preliminary list of  
        shutdown or alternative shutdown systems (C-size paper drawings and electronic
fire areas being considered for inspection prior to the on-site information gathering visit. During
        copy).
the information gathering visit, or shortly thereafter, the fire areas selected for inspection will be
  B.2 P&IDs and legend list for fire protection systems, including fire water supply, water
determined.  
        suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper
        drawings and electronic copy).
This document request is based on typical documents that a generic plant might have. As such,
this generic document request is not meant to imply that any specific plant is required to have all
of the listed documents. It is recognized that some documents listed below may not be
available for your plant.  In addition, the document titles listed below are based on typical
industry document names; your plant specific document titles may vary.  
A.  
DESIGN AND LICENSING BASIS DOCUMENTS
A.1
Post-fire Safe Shutdown or Alternative Shutdown Analysis.
A.2
Fire Hazards Analysis.  
A.3
Individual Plant Examination for External Events (IPEEE) (Fire Chapter ONLY),
including:
   
* Results of any post-IPEEE reviews; and
* LIST of actions taken or plant modifications performed in response to the IPEEE
results.  
   
A.4
Fire Protection Program and/or Fire Protection Plan.


                                                3
2
  B.3 AC and DC electrical system single line diagrams, from off-site power down to the
   
        highest safety-related bus level (typically 4kV, EDG bus) (C-size paper drawings and
        electronic copy ).
A.5
  B.4  Single line diagrams for motor control centers (MCCs) that supply post-fire safe
LIST of post-fire safe shutdown or alternative shutdown systems (i.e., safe shutdown  
        shutdown or alternative shutdown loads (only for selected fire areas) (C-size paper
equipment list).  
        drawings and electronic copy ).
  B.5  Equipment location drawings which identify the physical plant locations of post-fire
A.6  
        safe shutdown or alternative shutdown equipment (C-size paper drawings and
Fire Protection System Design Basis Document.
        electronic copy).
   
  B.6  Plant layout drawings which identify: (C-size paper drawings and electronic copy)
A.7
        *    Plant fire area boundaries;
Post-fire Safe Shutdown or Alternative Shutdown Design Basis Document.
        *    Combustible control zone drawings;
        *    Areas protected by automatic fire suppression and detection; and
A.8
        *    Locations of fire protection equipment.
LIST of applicable NFPA codes and standards and issuance dates (i.e., codes of
C. CLASSICAL FIRE PROTECTION
record).
  C.1  Fire protection program implementing procedures (e.g., administrative controls,
        surveillance testing, fire brigade).
A.9
  C.2  LIST of calculations and engineering analyses, studies, or evaluations for the fire
LIST of deviations from NFPA codes of record.  
        protection system, including the fire water system.
  C.3  Hydraulic calculation or analysis for fire protection water system in the selected fire
A.10 NFPA Compliance Review Report.  
        areas.
  C.4  Last two completed surveillance's records of fire protection features in the selected
A.11 Report or evaluation that compares the fire protection program to the NRC Branch
        fire areas (detection, suppression, damper inspections, damper tests, penetration
Technical Position (BTP) 9.5-1 Appendix A.  
        inspections, barrier inspections, etc.).
  C.5 LIST of routine tests, surveillances, and preventive maintenance on fire pumps,
A.12 Electronic copy of licensee submittals and NRC safety evaluation reports that are
        including pump controllers and batteries.
specifically listed in the facility operating license for the approved fire protection
  C.6  Last two completed annual fire pump pressure and flow tests.
program.
  C.7 Last two completed monthly and/or quarterly fire pump tests.
  C.8 Last two completed fire loop flow tests and loop flushes.
A.13 NRC Safety Evaluation Reports for fire protection program and post-fire safe
  C.9  CO2 and Halon initial discharge testing or calculation that determined appropriate
shutdown or alternative shutdown features.  
        concentrations and soak or hold times can be achieved (only for selected fire areas).
  C.10 Last five hot work permits (at power).
A.14 NRC approved exemptions for plant fire protection and post-fire safe shutdown or
  C.11 Last five transient combustible permits (at power).
alternative shutdown features.  
A.15 Exemption requests submitted but not yet approved for plant fire protection and post-
fire safe shutdown or alternative shutdown features.
A.16 Facility Operating License (electronic format only).
A.17 Technical Specifications (electronic format only).  
   
A.18 Technical Requirements Manual (electronic format only).  
A.19 Updated Final Safety Analysis Report (electronic format only).  
   
B.  
GENERAL PLANT DESIGN DOCUMENTS
   
B.1
Piping and instrumentation diagrams (P&IDs) and legend list for post-fire safe
shutdown or alternative shutdown systems (C-size paper drawings and electronic
copy).  
B.2
P&IDs and legend list for fire protection systems, including fire water supply, water
suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper
drawings and electronic copy).  


                                                4
C.12 For Fire Brigade Drills, provide the following:
3
    *  Last drill critique for a drill with off-site fire department support;
    *  Summary of any unsatisfactory drill performance items for last three years; and
    *  Last unannounced drill critique by a qualified individual independent of the
B.3
        licensee's staff.
AC and DC electrical system single line diagrams, from off-site power down to the  
C.13 For fire brigade equipment provide the following:
highest safety-related bus level (typically 4kV, EDG bus) (C-size paper drawings and
    *   Procedure for inventory and inspection; and
electronic copy ).
    *   Most recent inspection and inventory results.
C.14 Fire Brigade Medical Evaluations and Qualifications, including self-contained
B.4
    breathing apparatus (SCBA) and training lesson plans.
Single line diagrams for motor control centers (MCCs) that supply post-fire safe
C.15 Electronic copy of the mutual aid agreement for the first-due local fire department
shutdown or alternative shutdown loads (only for selected fire areas) (C-size paper
    that is currently in effect.
drawings and electronic copy ). 
C.16 Flooding analysis for selected fire areas which demonstrates:
    * a fire water pipe break in the selected fire areas, wont affect safe shutdown (SSD)
B.5
      capability for equipment in the selected fire areas;
Equipment location drawings which identify the physical plant locations of post-fire
    * a fire water pipe break in an adjacent fire area, wont affect SSD capability for
safe shutdown or alternative shutdown equipment (C-size paper drawings and
      equipment in the selected fire areas;
electronic copy).
    * hydrostatic rating of any floor penetration seals installed within the fire areas that
      are credited with keeping water from leaking into fire areas below.
B.6
C.17 Pre-fire plans for the selected fire areas and their adjacent fire areas.
Plant layout drawings which identify:  (C-size paper drawings and electronic copy)
C.18 For Emergency Lighting Units (ELU), provide the following:
    *  LIST of Preventive Maintenance tasks, frequencies, and bases;
*
    *  Most recently performed monthly or quarterly functional test;
Plant fire area boundaries;
    *  Most recently performed battery discharge performance test; if applicable
*
    *  ELU battery loading analysis;
Combustible control zone drawings;
    *  vendor manual(s);
*  
    *  results of black-out testing (if performed);
Areas protected by automatic fire suppression and detection; and  
    *  Maintenance Rule program information related to the ELU, if applicable; and
*  
    *  Compensatory measures taken when ELU are out of service.
Locations of fire protection equipment.
C.19 Impairment Log (for period of 3 months before the start of inspection), for fire
    protection features that are out of service.
C. CLASSICAL FIRE PROTECTION
C.20 LIST of Fire Protection screening reviews since the last inspection for recent design
    changes, modifications, or temporary modifications (e.g., a Generic Letter 86-10
C.1 Fire protection program implementing procedures (e.g., administrative controls,  
    review that screened out).
surveillance testing, fire brigade).  
C.21 LIST of fire protection system design changes completed in the last three years
    (including their associated 10 CFR 50.59 and Generic Letter 86-10 evaluations).
C.2 LIST of calculations and engineering analyses, studies, or evaluations for the fire  
protection system, including the fire water system.  
C.3 Hydraulic calculation or analysis for fire protection water system in the selected fire  
areas.
C.4 Last two completed surveillance's records of fire protection features in the selected  
fire areas (detection, suppression, damper inspections, damper tests, penetration
inspections, barrier inspections, etc.).
C.5 LIST of routine tests, surveillances, and preventive maintenance on fire pumps,
including pump controllers and batteries.  
C.6 Last two completed annual fire pump pressure and flow tests.  
C.7 Last two completed monthly and/or quarterly fire pump tests.
C.8 Last two completed fire loop flow tests and loop flushes.
C.9 CO2 and Halon initial discharge testing or calculation that determined appropriate
concentrations and soak or hold times can be achieved (only for selected fire areas).
C.10 Last five hot work permits (at power).  
C.11 Last five transient combustible permits (at power).  


                                                5
  C.22 LIST of penetration seal work, re-work, or installation activities, in the last three years.
4
  C.23 LIST of fire wrap work, re-work, or installation activities, in the last three years.
  C.24 Fire protection system health reports for the two most recent years.
  C.25 Fire protection program health report for the two most recent years.
  C.26 Emergency lighting system health reports for the two most recent years.
C.12 For Fire Brigade Drills, provide the following:
  C.27 Licensee evaluation of industry operating experience, related to the Fire Protection
        Program for the three most recent years.
*
D. ELECTRICAL
Last drill critique for a drill with off-site fire department support;
  D.1  Identify whether the cables in the selected fire areas are predominantly Thermoset or
*
        Thermoplastic. Specifically identify any Thermoplastic cable in the selected fire
Summary of any unsatisfactory drill performance items for last three years; and
        areas.
*  Last unannounced drill critique by a qualified individual independent of the
  D.2  Breaker and fuse coordination calculation for post-fire safe shutdown or alternative
licensee's staff.  
        shutdown equipment (only for selected fire areas).
  D.3 Administrative or configuration control procedures that govern fuse replacement (e.g.,
C.13 For fire brigade equipment provide the following:
        fuse control procedures).
  D.4 Maintenance procedures that verify breaker over-current trip settings to ensure
*
        coordination remains functional, for post-fire safe shutdown or alternative shutdown
Procedure for inventory and inspection; and
        equipment.
*
  D.5 Electrical system health reports for the two most recent years.
Most recent inspection and inventory results.  
  D.6  Last completed preventive maintenance of those components as tested from the safe
        shutdown or alternative shutdown panel.
C.14 Fire Brigade Medical Evaluations and Qualifications, including self-contained
  D.7  Schematic or elementary diagrams for circuits to be reviewed, as requested by
breathing apparatus (SCBA) and training lesson plans.  
        inspector (C-size paper drawings and electronic copy).
  D.8 Cable routing for components and equipment credited for post-fire safe shutdown or
C.15 Electronic copy of the mutual aid agreement for the first-due local fire department
        alternative shutdown (only for selected fire areas).
that is currently in effect.  
  D.9  LIST of post-fire safe shutdown or alternative shutdown design changes completed,
        since the last inspection.
C.16 Flooding analysis for selected fire areas which demonstrates:
E. SPURIOUS FIRE INDUCED CIRCUIT FAULTS
  E.1  LIST of identified fire induced circuit failure configurations (only for selected fire
* a fire water pipe break in the selected fire areas, wont affect safe shutdown (SSD)
        areas).
capability for equipment in the selected fire areas;
  E.2  Multiple Spurious Operation (MSO) Expert Panel Report.
* a fire water pipe break in an adjacent fire area, wont affect SSD capability for
equipment in the selected fire areas
* hydrostatic rating of any floor penetration seals installed within the fire areas that
are credited with keeping water from leaking into fire areas below.
C.17 Pre-fire plans for the selected fire areas and their adjacent fire areas.  
C.18 For Emergency Lighting Units (ELU), provide the following:
   
*
LIST of Preventive Maintenance tasks, frequencies, and bases;
*
Most recently performed monthly or quarterly functional test;
*
Most recently performed battery discharge performance test; if applicable
*
ELU battery loading analysis;
*
vendor manual(s); 
*
results of black-out testing (if performed);
*
Maintenance Rule program information related to the ELU, if applicable; and
*
Compensatory measures taken when ELU are out of service.  
   
C.19 Impairment Log (for period of 3 months before the start of inspection), for fire  
protection features that are out of service.  
   
C.20 LIST of Fire Protection screening reviews since the last inspection for recent design
changes, modifications, or temporary modifications (e.g., a Generic Letter 86-10
review that screened out).  
   
C.21 LIST of fire protection system design changes completed in the last three years
(including their associated 10 CFR 50.59 and Generic Letter 86-10 evaluations).  


                                                6
  E.3  Corrective actions for fire-induced circuit failures, both single and multiple spurious
5
        actuations for the selected fire areas.
F. OPERATIONS
  F.LIST of calculations and engineering analyses, studies, or evaluations for the safe
C.22 LIST of penetration seal work, re-work, or installation activities, in the last three years.  
        shutdown or alternative shutdown methodology.
  F.2 LIST of licensed operator Job Performance Measures (JPMs) for operator manual
C.23 LIST of fire wrap work, re-work, or installation activities, in the last three years.
        actions required by post-fire safe shutdown or alternative shutdown.
  F.3 LIST of non-licensed operator training associated with post-fire safe shutdown or
C.24 Fire protection system health reports for the two most recent years.
        alternative shutdown manual actions which would be performed by a non-licensed
        operator (including JPMs, in-field training walkdowns, simulations, or initial
C.25 Fire protection program health report for the two most recent years.  
        qualification).
  F.4 LIST of lesson plans for post-fire safe shutdown or alternative shutdown training for
C.26 Emergency lighting system health reports for the two most recent years.
        licensed and non-licensed operators.
   
  F.5  For operator manual actions (OMAs) provide the following:
C.27 Licensee evaluation of industry operating experience, related to the Fire Protection
        *  Manual Action Feasibility Study;
Program for the three most recent years.
        *  Operator Time Critical Action Program;
        *  Time lines for time-critical OMAs; and
D. ELECTRICAL
        *  Time line validations.
D.1 Identify whether the cables in the selected fire areas are predominantly Thermoset or  
        *  Environmental and habitability evaluations for post-fire operator manual actions
Thermoplastic. Specifically identify any Thermoplastic cable in the selected fire
            (temperature, smoke, humidity, SCBAs, etc.).
areas.  
  F.6 Thermal hydraulic calculation or analysis that determines the time requirements for
   
        time-critical manual operator actions.
D.2 Breaker and fuse coordination calculation for post-fire safe shutdown or alternative
  F.7  Operating procedures for post-fire safe shutdown from the control room with a
shutdown equipment (only for selected fire areas).
        postulated fire in the selected fire areas.
  F.8  Operating procedures for post-fire safe shutdown or alternative shutdown from
D.3 Administrative or configuration control procedures that govern fuse replacement (e.g.,  
        outside the control room.
fuse control procedures).  
  F.9 For safe shutdown equipment and tools, provide the following:
        *  Procedure for inventory and inspection; and
D.4 Maintenance procedures that verify breaker over-current trip settings to ensure
        *  Most recent inspection and inventory results.
coordination remains functional, for post-fire safe shutdown or alternative shutdown  
  F.10 LIST of procedures that implement Cold Shutdown Repairs.
equipment.  
  F.11 For Cold Shutdown Repairs, provide the following:
        *  Procedure for inventory and inspection (i.e., needed tools, material, etc.); and
D.5 Electrical system health reports for the two most recent years.
        *  Most recent inspection and inventory results.
   
D.6 Last completed preventive maintenance of those components as tested from the safe
shutdown or alternative shutdown panel. 
D.7 Schematic or elementary diagrams for circuits to be reviewed, as requested by
inspector (C-size paper drawings and electronic copy).
   
D.8 Cable routing for components and equipment credited for post-fire safe shutdown or
alternative shutdown (only for selected fire areas).  
D.9 LIST of post-fire safe shutdown or alternative shutdown design changes completed,
since the last inspection.  
E.  
SPURIOUS FIRE INDUCED CIRCUIT FAULTS
   
E.1
LIST of identified fire induced circuit failure configurations (only for selected fire
areas).  
E.2
Multiple Spurious Operation (MSO) Expert Panel Report.  


                                                7
  F.12 Calculation or analysis that demonstrates pressurizer level will remain within the
6
        indicating range for a PWR, or reactor water level will remain above the top of active
        fuel for a BWR, at the safe shutdown or alternative shutdown panel, in accordance
        with the requirements of 10 CFR 50 Appendix R III.L performance goals.
E.3    Corrective actions for fire-induced circuit failures, both single and multiple spurious
  F.13 For Radio communications, provide the following:
actuations for the selected fire areas.
        *    Communications Plan for fire fighting and post-fire safe shutdown manual actions;
        *   Repeater locations;
F.
        *   Cable routing for repeater power supply cables;
OPERATIONS
        *   Radio coverage test results; and
        *   Radio Dead Spot locations in the plant.
F.1
  F.14 NRC approved exemption requests for operator manual actions for
LIST of calculations and engineering analyses, studies, or evaluations for the safe
        10 CFR 50 Appendix R III.G.2 fire areas.
shutdown or alternative shutdown methodology.
  F.15 Exemption requests submitted but not yet approved, for operator manual actions for
        10 CFR 50 Appendix R III.G.2 fire areas.
F.2
G. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS
LIST of licensed operator Job Performance Measures (JPMs) for operator manual
  G.1  Corrective actions for fire-induced circuit failures (including but not limited to NRC
actions required by post-fire safe shutdown or alternative shutdown.
        IN 92-18), both single and multiple spurious actuations (only for selected fire areas).
  G.2  Corrective actions associated with post-fire safe shutdown or alternative shutdown
F.3
        operator manual actions.
LIST of non-licensed operator training associated with post-fire safe shutdown or  
  G.3 Internal and external self assessments, peer assessments, and audits of fire
alternative shutdown manual actions which would be performed by a non-licensed
        protection activities for the last three years.
operator (including JPMs, in-field training walkdowns, simulations, or initial
  G.4  Internal and external self assessments, peer assessments, and audits of post-fire
qualification).  
        safe shutdown or alternative shutdown capabilities for the last three years.
  G.5  LIST of condition reports for the fire protection system for the last three years.
F.4
  G.6 LIST of condition reports for emergency lighting units for the last three years.
LIST of lesson plans for post-fire safe shutdown or alternative shutdown training for
  G.7  LIST of condition reports for post-fire safe shutdown (SSD) or alternative shutdown
licensed and non-licensed operators.
        (ASD) issues for the last three years. This includes issues affecting the SSD or ASD
        analysis, fire hazards analysis, SSD or ASD operating procedures and/or training,
F.5
        timeline evaluations for operator actions, and supporting engineering evaluations,
For operator manual actions (OMAs) provide the following:
        analysis, or calculations.
  G.LIST of all Generic Letter 86 - 10 evaluations.
*  
  G.9 Copy of all Generic Letter 86 - 10 evaluations performed in the last three years.
Manual Action Feasibility Study;  
  G.10 All fire loading calculations and evaluations performed (only for selected fire areas
*  
        and their adjacent fire areas).
Operator Time Critical Action Program;  
*  
Time lines for time-critical OMAs; and  
*  
Time line validations.  
*
Environmental and habitability evaluations for post-fire operator manual actions  
(temperature, smoke, humidity, SCBAs, etc.).  
F.6
Thermal hydraulic calculation or analysis that determines the time requirements for  
time-critical manual operator actions.  
   
F.7
Operating procedures for post-fire safe shutdown from the control room with a
postulated fire in the selected fire areas.  
   
F.8
Operating procedures for post-fire safe shutdown or alternative shutdown from
outside the control room.
F.9
For safe shutdown equipment and tools, provide the following:
*
Procedure for inventory and inspection; and  
*
Most recent inspection and inventory results.  
F.10 LIST of procedures that implement Cold Shutdown Repairs.  
F.11 For Cold Shutdown Repairs, provide the following:
   
*
Procedure for inventory and inspection (i.e., needed tools, material, etc.); and  
*
Most recent inspection and inventory results.  


                        Mitigating Strategies Supporting Documentation
H. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS
7
  H.1 LIST of all changes to regulatory commitments made to meet the requirements of
        Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2).
  H.2  LIST of procedures and guidelines that were revised or generated to implement the
F.12 Calculation or analysis that demonstrates pressurizer level will remain within the
        mitigating strategies. These could be extensive damage mitigation guidelines
indicating range for a PWR, or reactor water level will remain above the top of active
        (EDMGs), severe accident management guidelines (SAMGs), emergency operating
fuel for a BWR, at the safe shutdown or alternative shutdown panel, in accordance
        procedures (EOPs), abnormal operating procedures (AOPs), etc.
with the requirements of 10 CFR 50 Appendix R III.L performance goals.
  H.3 A matrix that shows the correlation between the mitigation strategies identified in
        Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline,"
F.13 For Radio communications, provide the following:
        issued December 2006, and the site-specific procedures or guidelines that are used
   
        to implement each strategy.
*
  H.4 LIST of engineering evaluations or calculations that were used to verify the
Communications Plan for fire fighting and post-fire safe shutdown manual actions;
        engineering bases for the mitigating strategies.
*
  H.5 Piping and instrumentation diagrams (P&ID) and legend list or simplified flow
Repeater locations;
        diagrams for systems relied upon in the mitigating strategies. These could be the
*
        type used for training. (C-size paper drawings and electronic copy)
Cable routing for repeater power supply cables;
  H.6 LIST of modification packages or summary descriptions of modifications with
*
        simplified drawings, for necessary facility changes to implement the mitigating
Radio coverage test results; and
        strategies.
*
  H.7 LIST of routine tests, surveillances, and preventive maintenance for equipment and
Radio Dead Spot locations in the plant.
        tools needed to implement 10 CFR 50.54(hh)(2) strategies.
  H.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,
F.14  NRC approved exemption requests for operator manual actions for
        provide the following:
10 CFR 50 Appendix R III.G.2 fire areas.
        *    Procedures for inventory, testing, and inspection; and
        *    Most recent inspection, inventory, and testing results.
F.15 Exemption requests submitted but not yet approved, for operator manual actions for
        *    Copies of the last two completed performance tests, surveillances, and
10 CFR 50 Appendix R III.G.2 fire areas.
            preventative maintenance performed on the pumps, including the pump
   
            controllers and batteries.
G. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS
  H.LIST of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that
        differ from that documented in the submittals or the safety evaluation report.
G.1 Corrective actions for fire-induced circuit failures (including but not limited to NRC
                                                                                  Enclosure 2
IN 92-18), both single and multiple spurious actuations (only for selected fire areas).  
   
G.2 Corrective actions associated with post-fire safe shutdown or alternative shutdown
operator manual actions.  
G.3 Internal and external self assessments, peer assessments, and audits of fire
protection activities for the last three years.
G.4 Internal and external self assessments, peer assessments, and audits of post-fire
safe shutdown or alternative shutdown capabilities for the last three years.  
G.5 LIST of condition reports for the fire protection system for the last three years.  
G.6 LIST of condition reports for emergency lighting units for the last three years.
G.7 LIST of condition reports for post-fire safe shutdown (SSD) or alternative shutdown
(ASD) issues for the last three yearsThis includes issues affecting the SSD or ASD
analysis, fire hazards analysis, SSD or ASD operating procedures and/or training,
timeline evaluations for operator actions, and supporting engineering evaluations,  
analysis, or calculations.
G.8 LIST of all Generic Letter 86 - 10 evaluations.  
G.9 Copy of all Generic Letter 86 - 10 evaluations performed in the last three years.  
G.10 All fire loading calculations and evaluations performed (only for selected fire areas
and their adjacent fire areas).


                                          2
H.10 Site general arrangement drawings that show the majority of buildings and areas
    referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings and electronic
Enclosure 2
    copy).
Mitigating Strategies Supporting Documentation
H.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).
H.12 Copies of memoranda of understanding (MOU) (e.g., with local fire departments)
H. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS
    required to implement any mitigating strategies.
H.13 Docketed correspondence for 10 CFR 50.54(hh) to include license amendment
H.1 LIST of all changes to regulatory commitments made to meet the requirements of
    requests (LARS); Safety Evaluation Reports (SER); Request for Information (RFI)
Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2).
    and associated responses; and other pertinent documents.
H.2 LIST of procedures and guidelines that were revised or generated to implement the
mitigating strategies.  These could be extensive damage mitigation guidelines
(EDMGs), severe accident management guidelines (SAMGs), emergency operating
procedures (EOPs), abnormal operating procedures (AOPs), etc.
H.3 A matrix that shows the correlation between the mitigation strategies identified in
Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline,"
issued December 2006, and the site-specific procedures or guidelines that are used
to implement each strategy.
H.4 LIST of engineering evaluations or calculations that were used to verify the
engineering bases for the mitigating strategies.
H.5 Piping and instrumentation diagrams (P&ID) and legend list or simplified flow
diagrams for systems relied upon in the mitigating strategies.  These could be the
type used for training. (C-size paper drawings and electronic copy)
H.6 LIST of modification packages or summary descriptions of modifications with
simplified drawings, for necessary facility changes to implement the mitigating
strategies.
H.7 LIST of routine tests, surveillances, and preventive maintenance for equipment and
tools needed to implement 10 CFR 50.54(hh)(2) strategies.
H.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,
provide the following:
*
Procedures for inventory, testing, and inspection; and
*
Most recent inspection, inventory, and testing results.
*
Copies of the last two completed performance tests, surveillances, and
preventative maintenance performed on the pumps, including the pump
controllers and batteries.
H.9 LIST of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that
differ from that documented in the submittals or the safety evaluation report.
 
2
H.10 Site general arrangement drawings that show the majority of buildings and areas  
referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings and electronic  
copy).  
H.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).  
 
H.12 Copies of memoranda of understanding (MOU) (e.g., with local fire departments)  
required to implement any mitigating strategies.  
 
H.13 Docketed correspondence for 10 CFR 50.54(hh) to include license amendment  
requests (LARS); Safety Evaluation Reports (SER); Request for Information (RFI)  
and associated responses; and other pertinent documents.
}}
}}

Latest revision as of 10:07, 10 January 2025

(Unit 1 and 2) - Notification of a Triennial Fire Protection Baseline Inspection (NRC Inspection Report Nos. 05000338/2015008 and 05000339/2015008)
ML15216A279
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 08/03/2015
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Heacock D
Virginia Electric & Power Co (VEPCO)
References
IR 2015008
Download: ML15216A279 (14)


See also: IR 05000338/2015008

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

August 3, 2015

David A. Heacock

Virginia Electric & Power Company

Innsbrook Technical Center

5000 Dominion Blvd.

Glen Allen, VA 23060-6711

SUBJECT:

NORTH ANNA NUCLEAR PLANT (UNIT 1 AND 2) - NOTIFICATION OF A

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION

REPORT NOS. 05000338/2015008 AND 05000339/2015008)

Dear Mr. Heacock:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

staff will conduct a triennial fire protection baseline inspection at North Anna Nuclear Plant,

Units 1 and 2. The inspection team will be led by David Jones, a Senior Reactor Inspector from

the NRC Region II Office. The team will be composed of personnel from the NRC Region II

Office. The inspection will be conducted in accordance with IP 71111.05T, the NRC's baseline

fire protection inspection procedure, dated January 31, 2013.

On July 16, 2015, during a telephone conversation between Mr. J. Leberstien, Licensing, and

Mr. D. Jones of our respective staffs confirmed arrangements for an information gathering

onsite visit and a two-week onsite inspection. The schedule for the inspection is as follows:

Information Gathering Visit:

September 14 - 18, 2015

Week 1 of onsite inspection:

October 19 - 23, 2015

Week 2 of onsite inspection:

November 02 - 06, 2015

The purposes of the information gathering visit are to obtain information and documentation

needed to support the inspection, to become familiar with the North Anna Nuclear Plant fire

protection program, fire protection features, post-fire safe shutdown capabilities, plant layout,

mitigating strategies to address Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)

(2); and, as necessary, obtain plant specific site access training and badging for unescorted site

access.

An initial list of the documents the team will review during the conduct of the inspection is listed

in Enclosures 1 and 2. The team leader will contact you with any additional specific document

requests prior to the information gathering visit.

D. Heacock

2

During the information gathering visit, the team will also discuss the following inspection support

administrative details: office space size and location; specific documents requested to be made

available to the team in their office spaces; arrangements for reactor site access (including

radiation protection training, security, safety and fitness for duty requirements); and the

availability of knowledgeable plant staff and licensing organization personnel to serve as points

of contact during the inspection.

We request that during the on-site inspection weeks you ensure that copies of analyses,

evaluations or documentation regarding the implementation and maintenance of the station fire

protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest for the fire protection portion of the inspection are

those documents which establish that your fire protection program satisfies NRC regulatory

requirements and conforms to applicable NRC and industry fire protection guidance (i.e., fire

protection compliance assessment documents). For the 10 CFR 50.54(hh) (2) portion of the

inspection, those documents implementing your mitigating strategies and demonstrating the

management of your commitments for the strategies are of specific interest. Also, personnel

should be available at the site during the inspection that is knowledgeable regarding those plant

systems required to achieve and maintain safe shutdown conditions from inside and outside the

control room, including the electrical aspects of the relevant post-fire safe shutdown analyses,

reactor plant fire protection systems and features, and the station fire protection program and its

implementation.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, under control number

3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC Rules and Practices, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publically Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.hmtl (the Public Electronic Reading Room).

D. Heacock

3

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact David Jones, the team leader, in the Region II Office at 404-997-4631 or me at

404-997-4521.

Sincerely,

/RA/

Scott M. Shaeffer, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos.: 50-338; 50-339

License No.: DPR-32 and DPR-37

Enclosures:

1. Triennial Fire Protection Inspection Supporting Documentation

2. Mitigating Strategies Supporting Documentation

cc: Distribution via Listserv

_________________________

SUNSI REVIEW COMPLETE

FORM 665 ATTACHED

OFFICE

RII:DRS

RII:DRS

SIGNATURE

DAJ2

SMS

NAME

DJONES

SSHAEFFER

DATE

8/3/2015

8/3/2015

8/ /2015

8/ /2015

8/ /2015

8/ /2015

8/ /2015

E-MAIL COPY?

YES

NO

YES

NO YES

NO

YES

NO

YES

NO YES

NO

YES

NO

Letter to David A. Heacock from Scott M Shaeffer dated August 3, 2015.

SUBJECT:

NORTH ANNA NUCLEAR PLANT (UNIT 1 AND 2) - NOTIFICATION OF A

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION

REPORT NOS. 05000338/2015008 AND 05000339/2015008)

DISTRIBUTION:

RIDSNRRDIRS

PUBLIC

RidsNrrPMNorth Anna Resource

Enclosure 1

Triennial Fire Protection Inspection Supporting Documentation

The documents and information requested below should generally be made available to the

inspection team during the on-site information gathering visit for the team's use both on-site and

off-site during the inspection. Electronic format is the preferred media, except where specifically

noted, if readily available (The preferred file format is searchable .pdf files). If electronic media

is made available via an internet based remote document management system, then the remote

document access must allow inspectors to download, save, and print the documents in the

NRC's regional office. Electronic media on compact disc or paper records (hard copy) are

acceptable. At the end of the inspection, the documents in the team's possession will not be

retained.

Approximately three weeks before the on-site information gathering visit, the following

documents should be made available to the team leader for review in the regional office:

Post-fire Safe Shutdown or Alternative Shutdown Analysis (request A.1)

Fire Hazards Analysis (request A.2)

Individual Plant Examination for External Events (Fire Chapter ONLY) (request A.3)

Based on review of the above three documents, the team leader will identify a preliminary list of

fire areas being considered for inspection prior to the on-site information gathering visit. During

the information gathering visit, or shortly thereafter, the fire areas selected for inspection will be

determined.

This document request is based on typical documents that a generic plant might have. As such,

this generic document request is not meant to imply that any specific plant is required to have all

of the listed documents. It is recognized that some documents listed below may not be

available for your plant. In addition, the document titles listed below are based on typical

industry document names; your plant specific document titles may vary.

A.

DESIGN AND LICENSING BASIS DOCUMENTS

A.1

Post-fire Safe Shutdown or Alternative Shutdown Analysis.

A.2

Fire Hazards Analysis.

A.3

Individual Plant Examination for External Events (IPEEE) (Fire Chapter ONLY),

including:

  • Results of any post-IPEEE reviews; and
  • LIST of actions taken or plant modifications performed in response to the IPEEE

results.

A.4

Fire Protection Program and/or Fire Protection Plan.

2

A.5

LIST of post-fire safe shutdown or alternative shutdown systems (i.e., safe shutdown

equipment list).

A.6

Fire Protection System Design Basis Document.

A.7

Post-fire Safe Shutdown or Alternative Shutdown Design Basis Document.

A.8

LIST of applicable NFPA codes and standards and issuance dates (i.e., codes of

record).

A.9

LIST of deviations from NFPA codes of record.

A.10 NFPA Compliance Review Report.

A.11 Report or evaluation that compares the fire protection program to the NRC Branch

Technical Position (BTP) 9.5-1 Appendix A.

A.12 Electronic copy of licensee submittals and NRC safety evaluation reports that are

specifically listed in the facility operating license for the approved fire protection

program.

A.13 NRC Safety Evaluation Reports for fire protection program and post-fire safe

shutdown or alternative shutdown features.

A.14 NRC approved exemptions for plant fire protection and post-fire safe shutdown or

alternative shutdown features.

A.15 Exemption requests submitted but not yet approved for plant fire protection and post-

fire safe shutdown or alternative shutdown features.

A.16 Facility Operating License (electronic format only).

A.17 Technical Specifications (electronic format only).

A.18 Technical Requirements Manual (electronic format only).

A.19 Updated Final Safety Analysis Report (electronic format only).

B.

GENERAL PLANT DESIGN DOCUMENTS

B.1

Piping and instrumentation diagrams (P&IDs) and legend list for post-fire safe

shutdown or alternative shutdown systems (C-size paper drawings and electronic

copy).

B.2

P&IDs and legend list for fire protection systems, including fire water supply, water

suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper

drawings and electronic copy).

3

B.3

AC and DC electrical system single line diagrams, from off-site power down to the

highest safety-related bus level (typically 4kV, EDG bus) (C-size paper drawings and

electronic copy ).

B.4

Single line diagrams for motor control centers (MCCs) that supply post-fire safe

shutdown or alternative shutdown loads (only for selected fire areas) (C-size paper

drawings and electronic copy ).

B.5

Equipment location drawings which identify the physical plant locations of post-fire

safe shutdown or alternative shutdown equipment (C-size paper drawings and

electronic copy).

B.6

Plant layout drawings which identify: (C-size paper drawings and electronic copy)

Plant fire area boundaries;

Combustible control zone drawings;

Areas protected by automatic fire suppression and detection; and

Locations of fire protection equipment.

C. CLASSICAL FIRE PROTECTION

C.1 Fire protection program implementing procedures (e.g., administrative controls,

surveillance testing, fire brigade).

C.2 LIST of calculations and engineering analyses, studies, or evaluations for the fire

protection system, including the fire water system.

C.3 Hydraulic calculation or analysis for fire protection water system in the selected fire

areas.

C.4 Last two completed surveillance's records of fire protection features in the selected

fire areas (detection, suppression, damper inspections, damper tests, penetration

inspections, barrier inspections, etc.).

C.5 LIST of routine tests, surveillances, and preventive maintenance on fire pumps,

including pump controllers and batteries.

C.6 Last two completed annual fire pump pressure and flow tests.

C.7 Last two completed monthly and/or quarterly fire pump tests.

C.8 Last two completed fire loop flow tests and loop flushes.

C.9 CO2 and Halon initial discharge testing or calculation that determined appropriate

concentrations and soak or hold times can be achieved (only for selected fire areas).

C.10 Last five hot work permits (at power).

C.11 Last five transient combustible permits (at power).

4

C.12 For Fire Brigade Drills, provide the following:

Last drill critique for a drill with off-site fire department support;

Summary of any unsatisfactory drill performance items for last three years; and

  • Last unannounced drill critique by a qualified individual independent of the

licensee's staff.

C.13 For fire brigade equipment provide the following:

Procedure for inventory and inspection; and

Most recent inspection and inventory results.

C.14 Fire Brigade Medical Evaluations and Qualifications, including self-contained

breathing apparatus (SCBA) and training lesson plans.

C.15 Electronic copy of the mutual aid agreement for the first-due local fire department

that is currently in effect.

C.16 Flooding analysis for selected fire areas which demonstrates:

  • a fire water pipe break in the selected fire areas, wont affect safe shutdown (SSD)

capability for equipment in the selected fire areas;

  • a fire water pipe break in an adjacent fire area, wont affect SSD capability for

equipment in the selected fire areas;

are credited with keeping water from leaking into fire areas below.

C.17 Pre-fire plans for the selected fire areas and their adjacent fire areas.

C.18 For Emergency Lighting Units (ELU), provide the following:

LIST of Preventive Maintenance tasks, frequencies, and bases;

Most recently performed monthly or quarterly functional test;

Most recently performed battery discharge performance test; if applicable

ELU battery loading analysis;

vendor manual(s);

results of black-out testing (if performed);

Maintenance Rule program information related to the ELU, if applicable; and

Compensatory measures taken when ELU are out of service.

C.19 Impairment Log (for period of 3 months before the start of inspection), for fire

protection features that are out of service.

C.20 LIST of Fire Protection screening reviews since the last inspection for recent design

changes, modifications, or temporary modifications (e.g., a Generic Letter 86-10

review that screened out).

C.21 LIST of fire protection system design changes completed in the last three years

(including their associated 10 CFR 50.59 and Generic Letter 86-10 evaluations).

5

C.22 LIST of penetration seal work, re-work, or installation activities, in the last three years.

C.23 LIST of fire wrap work, re-work, or installation activities, in the last three years.

C.24 Fire protection system health reports for the two most recent years.

C.25 Fire protection program health report for the two most recent years.

C.26 Emergency lighting system health reports for the two most recent years.

C.27 Licensee evaluation of industry operating experience, related to the Fire Protection

Program for the three most recent years.

D. ELECTRICAL

D.1 Identify whether the cables in the selected fire areas are predominantly Thermoset or

Thermoplastic. Specifically identify any Thermoplastic cable in the selected fire

areas.

D.2 Breaker and fuse coordination calculation for post-fire safe shutdown or alternative

shutdown equipment (only for selected fire areas).

D.3 Administrative or configuration control procedures that govern fuse replacement (e.g.,

fuse control procedures).

D.4 Maintenance procedures that verify breaker over-current trip settings to ensure

coordination remains functional, for post-fire safe shutdown or alternative shutdown

equipment.

D.5 Electrical system health reports for the two most recent years.

D.6 Last completed preventive maintenance of those components as tested from the safe

shutdown or alternative shutdown panel.

D.7 Schematic or elementary diagrams for circuits to be reviewed, as requested by

inspector (C-size paper drawings and electronic copy).

D.8 Cable routing for components and equipment credited for post-fire safe shutdown or

alternative shutdown (only for selected fire areas).

D.9 LIST of post-fire safe shutdown or alternative shutdown design changes completed,

since the last inspection.

E.

SPURIOUS FIRE INDUCED CIRCUIT FAULTS

E.1

LIST of identified fire induced circuit failure configurations (only for selected fire

areas).

E.2

Multiple Spurious Operation (MSO) Expert Panel Report.

6

E.3 Corrective actions for fire-induced circuit failures, both single and multiple spurious

actuations for the selected fire areas.

F.

OPERATIONS

F.1

LIST of calculations and engineering analyses, studies, or evaluations for the safe

shutdown or alternative shutdown methodology.

F.2

LIST of licensed operator Job Performance Measures (JPMs) for operator manual

actions required by post-fire safe shutdown or alternative shutdown.

F.3

LIST of non-licensed operator training associated with post-fire safe shutdown or

alternative shutdown manual actions which would be performed by a non-licensed

operator (including JPMs, in-field training walkdowns, simulations, or initial

qualification).

F.4

LIST of lesson plans for post-fire safe shutdown or alternative shutdown training for

licensed and non-licensed operators.

F.5

For operator manual actions (OMAs) provide the following:

Manual Action Feasibility Study;

Operator Time Critical Action Program;

Time lines for time-critical OMAs; and

Time line validations.

Environmental and habitability evaluations for post-fire operator manual actions

(temperature, smoke, humidity, SCBAs, etc.).

F.6

Thermal hydraulic calculation or analysis that determines the time requirements for

time-critical manual operator actions.

F.7

Operating procedures for post-fire safe shutdown from the control room with a

postulated fire in the selected fire areas.

F.8

Operating procedures for post-fire safe shutdown or alternative shutdown from

outside the control room.

F.9

For safe shutdown equipment and tools, provide the following:

Procedure for inventory and inspection; and

Most recent inspection and inventory results.

F.10 LIST of procedures that implement Cold Shutdown Repairs.

F.11 For Cold Shutdown Repairs, provide the following:

Procedure for inventory and inspection (i.e., needed tools, material, etc.); and

Most recent inspection and inventory results.

7

F.12 Calculation or analysis that demonstrates pressurizer level will remain within the

indicating range for a PWR, or reactor water level will remain above the top of active

fuel for a BWR, at the safe shutdown or alternative shutdown panel, in accordance

with the requirements of 10 CFR 50 Appendix R III.L performance goals.

F.13 For Radio communications, provide the following:

Communications Plan for fire fighting and post-fire safe shutdown manual actions;

Repeater locations;

Cable routing for repeater power supply cables;

Radio coverage test results; and

Radio Dead Spot locations in the plant.

F.14 NRC approved exemption requests for operator manual actions for

10 CFR 50 Appendix R III.G.2 fire areas.

F.15 Exemption requests submitted but not yet approved, for operator manual actions for

10 CFR 50 Appendix R III.G.2 fire areas.

G. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS

G.1 Corrective actions for fire-induced circuit failures (including but not limited to NRC

IN 92-18), both single and multiple spurious actuations (only for selected fire areas).

G.2 Corrective actions associated with post-fire safe shutdown or alternative shutdown

operator manual actions.

G.3 Internal and external self assessments, peer assessments, and audits of fire

protection activities for the last three years.

G.4 Internal and external self assessments, peer assessments, and audits of post-fire

safe shutdown or alternative shutdown capabilities for the last three years.

G.5 LIST of condition reports for the fire protection system for the last three years.

G.6 LIST of condition reports for emergency lighting units for the last three years.

G.7 LIST of condition reports for post-fire safe shutdown (SSD) or alternative shutdown

(ASD) issues for the last three years. This includes issues affecting the SSD or ASD

analysis, fire hazards analysis, SSD or ASD operating procedures and/or training,

timeline evaluations for operator actions, and supporting engineering evaluations,

analysis, or calculations.

G.8 LIST of all Generic Letter 86 - 10 evaluations.

G.9 Copy of all Generic Letter 86 - 10 evaluations performed in the last three years.

G.10 All fire loading calculations and evaluations performed (only for selected fire areas

and their adjacent fire areas).

Enclosure 2

Mitigating Strategies Supporting Documentation

H. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS

H.1 LIST of all changes to regulatory commitments made to meet the requirements of

Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2).

H.2 LIST of procedures and guidelines that were revised or generated to implement the

mitigating strategies. These could be extensive damage mitigation guidelines

(EDMGs), severe accident management guidelines (SAMGs), emergency operating

procedures (EOPs), abnormal operating procedures (AOPs), etc.

H.3 A matrix that shows the correlation between the mitigation strategies identified in

Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline,"

issued December 2006, and the site-specific procedures or guidelines that are used

to implement each strategy.

H.4 LIST of engineering evaluations or calculations that were used to verify the

engineering bases for the mitigating strategies.

H.5 Piping and instrumentation diagrams (P&ID) and legend list or simplified flow

diagrams for systems relied upon in the mitigating strategies. These could be the

type used for training. (C-size paper drawings and electronic copy)

H.6 LIST of modification packages or summary descriptions of modifications with

simplified drawings, for necessary facility changes to implement the mitigating

strategies.

H.7 LIST of routine tests, surveillances, and preventive maintenance for equipment and

tools needed to implement 10 CFR 50.54(hh)(2) strategies.

H.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,

provide the following:

Procedures for inventory, testing, and inspection; and

Most recent inspection, inventory, and testing results.

Copies of the last two completed performance tests, surveillances, and

preventative maintenance performed on the pumps, including the pump

controllers and batteries.

H.9 LIST of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that

differ from that documented in the submittals or the safety evaluation report.

2

H.10 Site general arrangement drawings that show the majority of buildings and areas

referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings and electronic

copy).

H.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).

H.12 Copies of memoranda of understanding (MOU) (e.g., with local fire departments)

required to implement any mitigating strategies.

H.13 Docketed correspondence for 10 CFR 50.54(hh) to include license amendment

requests (LARS); Safety Evaluation Reports (SER); Request for Information (RFI)

and associated responses; and other pertinent documents.