{{#Wiki_filter:TUOI: ANO-2-JPM-NRC-CNTMT00                                                           Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:     2                       REV #:   000                     DATE:
{{#Wiki_filter:TUOI: ANO-2-JPM-NRC-CNTMT00 Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:
SYSTEM/DUTY AREA:           Equipment Control (A.2)
2 REV #:
TASK:       Determine actions for maintaining configuration control with inoperable containment penetration isolation valve.
000 DATE:
SYSTEM/DUTY AREA:
Equipment Control (A.2)
TASK:
Determine actions for maintaining configuration control with inoperable containment penetration isolation valve.
JTA#:
JTA#:
KA VALUE       RO:         2.1     SRO:       3.0       KA  
KA VALUE RO:
2.1 SRO:
3.0 KA  


==REFERENCE:==
==REFERENCE:==
2.2.14 APPROVED FOR ADMINISTRATION TO:             RO:             SRO:     X TASK LOCATION:             INSIDE CR:             OUTSIDE CR:             BOTH:         X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
2.2.14 APPROVED FOR ADMINISTRATION TO:
PLANT SITE:                         SIMULATOR:         Perform       CLASSROOM:       Perform POSITION EVALUATED:         RO:                   SRO:
RO:
ACTUAL TESTING ENVIRONMENT:           SIMULATOR:           PLANT SITE:           CLASSROOM:
SRO:
TESTING METHOD:         SIMULATE:             PERFORM:
X TASK LOCATION:
APPROXIMATE COMPLETION TIME IN MINUTES:                   15 Minutes REFERENCE(S):     Unit 2 Tech Specs, P&ID's, OP 1015.034, Containment Penetration Administration Control and 2104.014, LRW and BMS Operations.
INSIDE CR:
EXAMINEE'S NAME:                                                 SSN:
OUTSIDE CR:
BOTH:
X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform CLASSROOM:
Perform POSITION EVALUATED:
RO:
SRO:
ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
CLASSROOM:
TESTING METHOD:
SIMULATE:
PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
Unit 2 Tech Specs, P&ID's, OP 1015.034, Containment Penetration Administration Control and 2104.014, LRW and BMS Operations.
EXAMINEE'S NAME:
SSN:
EVALUATOR'S NAME:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                       UNSATISFACTORY:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
Start Time             Stop Time             Total Time SIGNED:                                             DATE:
Start Time Stop Time Total Time SIGNED:
DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


TUOI: ANO-2-JPM-NRC-CNTMT00                                                     Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
TUOI: ANO-2-JPM-NRC-CNTMT00 Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
Line 48: Line 76:
* Maintenance on 2CV 2061-2, Containment Sump Isolation valve, is expected to take 12 hours.
* Maintenance on 2CV 2061-2, Containment Sump Isolation valve, is expected to take 12 hours.
TASK STANDARD: Determine the following requirements for controlling containment penetration isolation due to inoperable 2CV-2061-2, Containment Sump Isolation valve:
TASK STANDARD: Determine the following requirements for controlling containment penetration isolation due to inoperable 2CV-2061-2, Containment Sump Isolation valve:
* TS 3.6.3.1 is applicable.
TS 3.6.3.1 is applicable.
* Within 4 hours, to comply with Tech Spec 3.6.3.1, containment penetration '2P68' must be isolated by closing 2CV-2060-1, Containment Sump Isolation valve and deenergizing the valve.
Within 4 hours, to comply with Tech Spec 3.6.3.1, containment penetration '2P68' must be isolated by closing 2CV-2060-1, Containment Sump Isolation valve and deenergizing the valve.
* To maintain configuration control on 2CV 2060-1, a clearance tag should be installed on the breaker. It is also acceptable to record position of the valve status on 1015.034A, Containment Penetration Valve Log or the Component Out of Position Computer log.
To maintain configuration control on 2CV 2060-1, a clearance tag should be installed on the breaker. It is also acceptable to record position of the valve status on 1015.034A, Containment Penetration Valve Log or the Component Out of Position Computer log.
TASK PERFORMANCE AIDS: OP 1015.034, Containment Penetration Administrative Control, OP 2104.014, LRW and BMS Operations and PID 2213 sh1 and 8.
TASK PERFORMANCE AIDS: OP 1015.034, Containment Penetration Administrative Control, OP 2104.014, LRW and BMS Operations and PID 2213 sh1 and 8.


TUOI: ANO-2-JPM-NRC-CNTMT00                                                                   Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
TUOI: ANO-2-JPM-NRC-CNTMT00 Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
Based on initial conditions, determine the Tech Spec applicability and required actions, including administrative configuration controls required.
Based on initial conditions, determine the Tech Spec applicability and required actions, including administrative configuration controls required.
CRITICAL ELEMENTS (C)             1, 2, 3 PERFORMANCE CHECKLIST                               STANDARD                           (Circle One)
CRITICAL ELEMENTS (C) 1, 2, 3 PERFORMANCE CHECKLIST STANDARD (Circle One)
N/A SAT UNSAT (C)   1. Review OP 1015.034,                     Examinee determined that Containment Penetration                2CV-2061-2, Containment Administrative Control and            Sump Isolation valve, failure to identify Tech Spec 3.6.3.1            close required entry into Tech applicability.                        Spec 3.6.3.1 four-hour action statement.
(C)
N/A SAT UNSAT (C)   2. Determine that Tech Spec               Examinee determined that compliance is achieved by             closing 2CV-2060-1, closing and controlling the            Containment Sump Isolation operation of valve 2CV-2060-           valve, and maintaining 1, Containment Sump                   containment penetration Isolation valve, using P&ID            "2P68" secure is required for 2213 SH 1 and 2.                      Tech Spec compliance.
: 1. Review OP 1015.034, Containment Penetration Administrative Control and identify Tech Spec 3.6.3.1 applicability.
Examinee determined that 2CV-2061-2, Containment Sump Isolation valve, failure to close required entry into Tech Spec 3.6.3.1 four-hour action statement.
N/A SAT UNSAT (C)
: 2. Determine that Tech Spec compliance is achieved by closing and controlling the operation of valve 2CV-2060-1, Containment Sump Isolation valve, using P&ID 2213 SH 1 and 2.
Examinee determined that closing 2CV-2060-1, Containment Sump Isolation valve, and maintaining containment penetration "2P68" secure is required for Tech Spec compliance.
N/A SAT UNSAT


TUOI: ANO-2-JPM-NRC-CNTMT00                                               Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                     STANDARD                   (Circle One)
TUOI: ANO-2-JPM-NRC-CNTMT00 Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)
N/A SAT UNSAT (C) 3. Plant configuration control   Examinee complied with TS maintained by placing a       3.6.3.1 and maintained plant clearance tag on the supply   configuration control of breaker, 2B51-B2 to 2CV-       penetration by:
(C)
2060-1, Containment Sump
: 3. Plant configuration control maintained by placing a clearance tag on the supply breaker, 2B51-B2 to 2CV-2060-1, Containment Sump Isolation valve, in the open position.
* Within 4 hours containment Isolation valve, in the open      penetration '2P68' must be position.                          secured by opening the supply breaker to 2CV-2060-1, Containment Sump Isolation valve, 2B51-B1.
EXAMINER's CUE:
AND EXAMINER's CUE:
Report that 2CV 2060-1 is in a high radiation area and a local lock or clearance tag is not required.
* Placing a Clearance tag on Report that 2CV 2060-1 is in a        the breaker in open high radiation area and a local      position.
Examinee complied with TS 3.6.3.1 and maintained plant configuration control of penetration by:
lock or clearance tag is not      OR required.
* Within 4 hours containment penetration '2P68' must be secured by opening the supply breaker to 2CV-2060-1, Containment Sump Isolation valve, 2B51-B1.
AND
* Placing a Clearance tag on the breaker in open position.
OR
* Recording position of the valve and breaker in the COOP log or Containment penetration valve log.
* Recording position of the valve and breaker in the COOP log or Containment penetration valve log.
EXAMINERS NOTE: The Candidate may discuss use of a clearance tag on the drain valves 2ABS 2061A and 2ABS 2061B. Also, the candidate may discuss gagging the thermal relief in the penetration 2PSV 2000.
N/A SAT UNSAT EXAMINERS NOTE: The Candidate may discuss use of a clearance tag on the drain valves 2ABS 2061A and 2ABS 2061B. Also, the candidate may discuss gagging the thermal relief in the penetration 2PSV 2000.
These steps are not required for successful completion of this JPM.
These steps are not required for successful completion of this JPM.
END
END


TUOI: ANO-2-JPM-NRC-CNTMT00                                                   Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
TUOI: ANO-2-JPM-NRC-CNTMT00 Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
* The plant is at 100% power and Steady State.
* The plant is at 100% power and Steady State.
* Maintenance is in progress repairing Stator Water Cooling Deionizer flow indicator, 2FI-9785.
* Maintenance is in progress repairing Stator Water Cooling Deionizer flow indicator, 2FI-9785.
Line 83: Line 119:
Based on initial conditions, determine the Tech Spec applicability and required actions, including administrative configuration controls required.
Based on initial conditions, determine the Tech Spec applicability and required actions, including administrative configuration controls required.


TUOI: ANO-2-JPM-NRC-CNTMT00                                                   Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
TUOI: ANO-2-JPM-NRC-CNTMT00 Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
* The plant is at 100% power and Steady State.
* The plant is at 100% power and Steady State.
* Maintenance is in progress repairing Stator Water Cooling Deionizer flow indicator, 2FI-9785.
* Maintenance is in progress repairing Stator Water Cooling Deionizer flow indicator, 2FI-9785.
Line 95: Line 131:
Based on initial conditions, determine the Tech Spec applicability and required actions, including administrative configuration controls required.
Based on initial conditions, determine the Tech Spec applicability and required actions, including administrative configuration controls required.


TUOI: ANO-2-JPM-NRC-EPLANEC                                                       Page 1 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:     2                     REV #:   000                     DATE:
TUOI: ANO-2-JPM-NRC-EPLANEC Page 1 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:
SYSTEM/DUTY AREA:         Emergency Plan (A.4)
2 REV #:
TASK:       Determine EAL Classification and complete Shift Manager paperwork.
000 DATE:
SYSTEM/DUTY AREA:
Emergency Plan (A.4)
TASK:
Determine EAL Classification and complete Shift Manager paperwork.
JTA#:
JTA#:
KA VALUE       RO:       2.2       SRO:       4.0       KA  
KA VALUE RO:
2.2 SRO:
4.0 KA  


==REFERENCE:==
==REFERENCE:==
2.4.38 APPROVED FOR ADMINISTRATION TO:           RO:             SRO:   X TASK LOCATION:           INSIDE CR:             OUTSIDE CR:           BOTH:       X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
2.4.38 APPROVED FOR ADMINISTRATION TO:
PLANT SITE:                       SIMULATOR:           Perform       CLASSROOM:   Perform POSITION EVALUATED:       RO:                     SRO:
RO:
ACTUAL TESTING ENVIRONMENT:         SIMULATOR:             PLANT SITE:       CLASSROOM:
SRO:
TESTING METHOD:       SIMULATE:               PERFORM:
X TASK LOCATION:
APPROXIMATE COMPLETION TIME IN MINUTES:                 20 Minutes REFERENCE(S):     1903.011, Emergency Response / Notifications, 1903.010, EAL EXAMINEE'S NAME:                                                 SSN:
INSIDE CR:
OUTSIDE CR:
BOTH:
X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform CLASSROOM:
Perform POSITION EVALUATED:
RO:
SRO:
ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
CLASSROOM:
TESTING METHOD:
SIMULATE:
PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:
20 Minutes REFERENCE(S):
1903.011, Emergency Response / Notifications, 1903.010, EAL EXAMINEE'S NAME:
SSN:
EVALUATOR'S NAME:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                     UNSATISFACTORY:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
Start Time           Stop Time               Total Time SIGNED:                                             DATE:
Start Time Stop Time Total Time SIGNED:
DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


TUOI: ANO-2-JPM-NRC-EPLANEC                                                   Page 2 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
TUOI: ANO-2-JPM-NRC-EPLANEC Page 2 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
Line 143: Line 207:
* All other systems and actuations are operating as designed.
* All other systems and actuations are operating as designed.
TASK STANDARD: Determine the following:
TASK STANDARD: Determine the following:
GE; EAL 1.7, or 5.4, Radiological Effluents 250mr/hr TEDE or 500mr/hr Child Thyroid CDE and use 1903.011S form.
GE; EAL 1.7, or 5.4, Radiological Effluents 250mr/hr TEDE or 500mr/hr Child Thyroid CDE and use 1903.011S form.
PAR 1 & PAR 3, zones evacuated are G, K, N.
PAR 1 & PAR 3, zones evacuated are G, K, N.
and shelter the remaining zones.
and shelter the remaining zones.
Line 150: Line 214:
TASK PERFORMANCE AIDS: 1903.010, Emergency Action Levels; 1903.011, Emergency Response / Notifications; Steam Tables
TASK PERFORMANCE AIDS: 1903.010, Emergency Action Levels; 1903.011, Emergency Response / Notifications; Steam Tables


TUOI: ANO-2-JPM-NRC-EPLANEC                                                                   Page 3 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
TUOI: ANO-2-JPM-NRC-EPLANEC Page 3 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
Determine the highest EAL classification and PAR, if required, from the given initial conditions and complete applicable Shift Manager emergency direction and control checklist.
Determine the highest EAL classification and PAR, if required, from the given initial conditions and complete applicable Shift Manager emergency direction and control checklist.
CRITICAL ELEMENTS (C)           1, 2, 5, 8, 10,11,13 PERFORMANCE CHECKLIST                               STANDARD                           (Circle One)
CRITICAL ELEMENTS (C) 1, 2, 5, 8, 10,11,13 PERFORMANCE CHECKLIST STANDARD (Circle One)
N/A SAT UNSAT (C)   1. Review OP 1903.010, EAL for Examinee determined the classifying event using Step           Proper EAL classification was 4.10, 4.11 and EAL index.               a GE based on EAL 1.7, challenge or failure of 3 fission product barriers and/or EAL 5.4, Radiological Effluents 250mr/hr TEDE or 500mr/hr Child Thyroid CDE N/A SAT UNSAT (C)   2. Determine that 1903.011S,               Examinee determined that GE emergency direction and             1903.011S was appropriate control checklist for shift             form for event in progress.
(C)
manager was appropriate checklist for event.
: 1. Review OP 1903.010, EAL for classifying event using Step 4.10, 4.11 and EAL index.
Examinee determined the Proper EAL classification was a GE based on EAL 1.7, challenge or failure of 3 fission product barriers and/or EAL 5.4, Radiological Effluents 250mr/hr TEDE or 500mr/hr Child Thyroid CDE N/A SAT UNSAT (C)
: 2. Determine that 1903.011S, GE emergency direction and control checklist for shift manager was appropriate checklist for event.
Examinee determined that 1903.011S was appropriate form for event in progress.
N/A SAT UNSAT
N/A SAT UNSAT
: 3. Determine initial notification           Examinee determined that paperwork completion and                Initial notification paperwork ENS notifications are                  and ENS notifications are required.                              required and would direct the shift engineer to complete it.
: 3. Determine initial notification paperwork completion and ENS notifications are required.
EXAMINER's CUE:
EXAMINER's CUE:
Inform examinee that the Initial notification paperwork and ENS notifications are being completed by opposite unit Shift Engineer.
Inform examinee that the Initial notification paperwork and ENS notifications are being completed by opposite unit Shift Engineer.
: 4. Determine need to inform                 Inform Control Room staff that control room staff of EAL.             a General Emergency has been declared on Unit 2 due to EAL 1.7 or 5.4.
Examinee determined that Initial notification paperwork and ENS notifications are required and would direct the shift engineer to complete it.
N/A SAT UNSAT
: 4. Determine need to inform control room staff of EAL.
Inform Control Room staff that a General Emergency has been declared on Unit 2 due to EAL 1.7 or 5.4.


TUOI: ANO-2-JPM-NRC-EPLANEC                                             Page 4 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                       STANDARD               (Circle One)
TUOI: ANO-2-JPM-NRC-EPLANEC Page 4 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)
N/A SAT UNSAT (C) 5. Determine Evacuation routes     Examinee determined that 1 and 3 are appropriate due     plant evacuation routes 1 and to wind direction being from    3 should be used.
(C)
190°.
: 5. Determine Evacuation routes 1 and 3 are appropriate due to wind direction being from 190°.
EXAMINER's NOTE: No areas need to be avoided during plant evacuation.
Examinee determined that plant evacuation routes 1 and 3 should be used.
N/A SAT UNSAT
N/A SAT UNSAT EXAMINER's NOTE: No areas need to be avoided during plant evacuation.
: 6. Identify need to contact         Examinee determined that Security for performance of     security must be contacted to initial accountability within 30 perform initial accountability minutes and for notification     within 30 minutes and that a that plant evacuation is         plant evacuation is required.
: 6. Identify need to contact Security for performance of initial accountability within 30 minutes and for notification that plant evacuation is required.
required.
EXAMINER's CUE:
EXAMINER's CUE:
Inform Examinee that security has been contacted.
Inform Examinee that security has been contacted.
EXAMINER's NOTE: Secondary Guard station does not need to be opened and manned.
Examinee determined that security must be contacted to perform initial accountability within 30 minutes and that a plant evacuation is required.
N/A SAT UNSAT EXAMINER's NOTE: Secondary Guard station does not need to be opened and manned.
: 7. Identify need to notify HP to monitor personnel at exit portal monitors.
EXAMINER's CUE:
Inform examinee that HP has been contacted to perform personnel monitoring at exit portal monitors and to relax decontamination and radiation protection measures as necessary to expedite evacuation.
Examinee determined that HP is needed to monitor personnel at exit portal monitors and relax decontamination and radiation protection measures as necessary to expedite evacuation.
N/A SAT UNSAT
N/A SAT UNSAT
: 7. Identify need to notify HP to    Examinee determined that HP monitor personnel at exit        is needed to monitor portal monitors.                personnel at exit portal monitors and relax EXAMINER's CUE:                    decontamination and radiation Inform examinee that HP has      protection measures as been contacted to perform        necessary to expedite personnel monitoring at exit    evacuation.
portal monitors and to relax decontamination and radiation protection measures as necessary to expedite evacuation.


TUOI: ANO-2-JPM-NRC-EPLANEC                                             Page 5 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                     STANDARD                 (Circle One)
TUOI: ANO-2-JPM-NRC-EPLANEC Page 5 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)
N/A SAT UNSAT (C) 8. Determine need to perform     Examinee determined that Plant Evacuation.             plant evacuation is required and needs to make EXAMINER's CUE:                 announcement.
(C)
: 8. Determine need to perform Plant Evacuation.
EXAMINER's CUE:
Inform examinee that SE has performed steps 9 and 10 of 1903.011S when either a plant announcement has been started or when requested that SE perform actions.
Inform examinee that SE has performed steps 9 and 10 of 1903.011S when either a plant announcement has been started or when requested that SE perform actions.
Examinee determined that plant evacuation is required and needs to make announcement.
N/A SAT UNSAT
N/A SAT UNSAT
: 9. Identify need to instruct     Determined that Control Room Control Room personnel to    personnel and NLO's on both log badges into card reader  unit's must be notified to log for initial accountability. badges into card reader for initial accountability.
: 9. Identify need to instruct Control Room personnel to log badges into card reader for initial accountability.
EXAMINER's CUE:
EXAMINER's CUE:
Inform examinee that control room personnel on both unit's have been notified and both unit's NLO's have been notified.
Inform examinee that control room personnel on both unit's have been notified and both unit's NLO's have been notified.
N/A SAT UNSAT (C) 10.Perform Exclusion area       Examinee determined that Evacuation.                  exclusion area evacuation is required and needs to direct EXAMINER's CUE:                  security to perform it and the Inform examinee that security Corp of Engineers also must and Corp of Engineers have    be notified to access portions been informed.                of the lake within the exclusion area by boat.
Determined that Control Room personnel and NLO's on both unit's must be notified to log badges into card reader for initial accountability.
N/A SAT UNSAT (C) 10.Perform Exclusion area Evacuation.
EXAMINER's CUE:
Inform examinee that security and Corp of Engineers have been informed.
Examinee determined that exclusion area evacuation is required and needs to direct security to perform it and the Corp of Engineers also must be notified to access portions of the lake within the exclusion area by boat.
N/A SAT UNSAT


TUOI: ANO-2-JPM-NRC-EPLANEC                                           Page 6 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                     STANDARD               (Circle One)
TUOI: ANO-2-JPM-NRC-EPLANEC Page 6 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)
N/A SAT UNSAT (C) 11. Using 1903.011 attachment 8   Examinee determined that and attachment 6, determine     PAR 1 and PAR 3 should be that PAR 1 and 3 should be     combined and zones recommended and zones           'G, K, N' from PAR 1 and
(C)
        'G, K, N' should be evacuated  Zone 'G' from PAR 3 should and shelter the remaining      be evacuated and shelter the zones.                          remaining zones.
: 11. Using 1903.011 attachment 8 and attachment 6, determine that PAR 1 and 3 should be recommended and zones
'G, K, N' should be evacuated and shelter the remaining zones.
Examinee determined that PAR 1 and PAR 3 should be combined and zones
'G, K, N' from PAR 1 and Zone 'G' from PAR 3 should be evacuated and shelter the remaining zones.
N/A SAT UNSAT
N/A SAT UNSAT
: 12. Determine that chemistry     Examinee determined that should be contacted to       chemistry should monitor monitor RDACS.                RDACS.
: 12. Determine that chemistry should be contacted to monitor RDACS.
EXAMINER's CUE:
EXAMINER's CUE:
Inform examinee that Chemistry has been informed and reports that RDACS indicates a radioactive plume extending over the Sally Port and north plant access road to highway 333.
Inform examinee that Chemistry has been informed and reports that RDACS indicates a radioactive plume extending over the Sally Port and north plant access road to highway 333.
N/A SAT UNSAT (C) 13. Determine that Security       Examinee determined that needs to be informed that     security should be informed approach route to the plant   that evacuation route 2 or the via the route impacted by the areas affected by the radioactive plume should be  radioactive plume to the plant avoided.                      should be avoided.
Examinee determined that chemistry should monitor RDACS.
N/A SAT UNSAT (C)
: 13. Determine that Security needs to be informed that approach route to the plant via the route impacted by the radioactive plume should be avoided.
EXAMINER's CUE:
EXAMINER's CUE:
Inform examinee that security has been informed.
Inform examinee that security has been informed.
END
Examinee determined that security should be informed that evacuation route 2 or the areas affected by the radioactive plume to the plant should be avoided.
N/A SAT UNSAT END


TUOI: ANO-2-JPM-NRC-EPLANEC                                                 Page 7 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
TUOI: ANO-2-JPM-NRC-EPLANEC Page 7 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
* The plant tripped 30 minutes ago after operating at 100% power for 250 days.
* The plant tripped 30 minutes ago after operating at 100% power for 250 days.
* RCS Tc is 450°F and cool down in progress.
* RCS Tc is 450°F and cool down in progress.
Line 225: Line 311:
Determine the highest EAL classification and PAR, if required, from the given initial conditions and complete applicable Shift Manager emergency direction and control checklist.
Determine the highest EAL classification and PAR, if required, from the given initial conditions and complete applicable Shift Manager emergency direction and control checklist.


TUOI: ANO-2-JPM-NRC-EPLANEC                                                 Page 8 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
TUOI: ANO-2-JPM-NRC-EPLANEC Page 8 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
* The plant is tripped 30 minutes ago from 100% power for 250 days.
* The plant is tripped 30 minutes ago from 100% power for 250 days.
* RCS Tc is 450°F and cool down in progress.
* RCS Tc is 450°F and cool down in progress.
Line 254: Line 340:
Determine the highest EAL classification and PAR, if required, from the given initial conditions and complete applicable Shift Manager emergency direction and control checklist.
Determine the highest EAL classification and PAR, if required, from the given initial conditions and complete applicable Shift Manager emergency direction and control checklist.


TUOI: ANO-2-JPM-NRC-MSSVINOP                                                         Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:     2                       REV #:   000                     DATE:
TUOI: ANO-2-JPM-NRC-MSSVINOP Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:
SYSTEM/DUTY AREA:           Conduct of Operations (A.1)
2 REV #:
TASK:       Verify RPS trip setpoint determination for inoperable MSSV JTA#:
000 DATE:
KA VALUE       RO:         3.0       SRO:       3.4       KA  
SYSTEM/DUTY AREA:
Conduct of Operations (A.1)
TASK:
Verify RPS trip setpoint determination for inoperable MSSV JTA#:
KA VALUE RO:
3.0 SRO:
3.4 KA  


==REFERENCE:==
==REFERENCE:==
2.1.3 APPROVED FOR ADMINISTRATION TO:             RO:             SRO:   X TASK LOCATION:             INSIDE CR:               OUTSIDE CR:           BOTH:       X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
2.1.3 APPROVED FOR ADMINISTRATION TO:
PLANT SITE:                         SIMULATOR:           Perform       CLASSROOM:     Perform POSITION EVALUATED:         RO:                     SRO:
RO:
ACTUAL TESTING ENVIRONMENT:           SIMULATOR:             PLANT SITE:       CLASSROOM:
SRO:
TESTING METHOD:         SIMULATE:               PERFORM:
X TASK LOCATION:
APPROXIMATE COMPLETION TIME IN MINUTES:                   15 Minutes REFERENCE(S):       Form 1015.016B, Shift turnover checklist, form 1015.016Q, MTC VS EFPD and power and Unit 2 Tech Specs.
INSIDE CR:
EXAMINEE'S NAME:                                                   SSN:
OUTSIDE CR:
BOTH:
X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform CLASSROOM:
Perform POSITION EVALUATED:
RO:
SRO:
ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
CLASSROOM:
TESTING METHOD:
SIMULATE:
PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
Form 1015.016B, Shift turnover checklist, form 1015.016Q, MTC VS EFPD and power and Unit 2 Tech Specs.
EXAMINEE'S NAME:
SSN:
EVALUATOR'S NAME:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                       UNSATISFACTORY:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
Start Time             Stop Time               Total Time SIGNED:                                               DATE:
Start Time Stop Time Total Time SIGNED:
DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


TUOI: ANO-2-JPM-NRC-MSSVINOP                                                 Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
TUOI: ANO-2-JPM-NRC-MSSVINOP Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
Line 287: Line 401:
TASK PERFORMANCE AIDS: Shift Turnover Checklist, form 1015.016B, Unit 2 Tech Specs, Moderator Temperature Coefficient VS EFPD and Power, form 1015.016Q, and a straight edge.
TASK PERFORMANCE AIDS: Shift Turnover Checklist, form 1015.016B, Unit 2 Tech Specs, Moderator Temperature Coefficient VS EFPD and Power, form 1015.016Q, and a straight edge.


TUOI: ANO-2-JPM-NRC-MSSVINOP                                                                   Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
TUOI: ANO-2-JPM-NRC-MSSVINOP Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
As oncoming CRS, based on initial conditions, verify the shift turnover checklist for correctness.
As oncoming CRS, based on initial conditions, verify the shift turnover checklist for correctness.
CRITICAL ELEMENTS (C)         3, 4 PERFORMANCE CHECKLIST                                 STANDARD                         (Circle One)
CRITICAL ELEMENTS (C) 3, 4 PERFORMANCE CHECKLIST STANDARD (Circle One)
EXAMINER's NOTE: TSI disabled on the MTG has no impact on plant operation or shift turnover checklist. The out of service 'B' service water pump has no Tech Spec implications due to 'A' and 'C' service water pumps being operable.
EXAMINER's NOTE: TSI disabled on the MTG has no impact on plant operation or shift turnover checklist. The out of service 'B' service water pump has no Tech Spec implications due to 'A' and 'C' service water pumps being operable.
N/A SAT UNSAT
: 1. Review Shift turnover checklist for correctness.
: 1. Review Shift turnover                 Examinee reviewed shift checklist for correctness.            turnover checklist.
EXAMINER's CUE:
EXAMINER's CUE:
Inform examinee that an independent review of the values for maximum linear power and trip setpoint derived by CBOT is required.
Inform examinee that an independent review of the values for maximum linear power and trip setpoint derived by CBOT is required.
Examinee reviewed shift turnover checklist.
N/A SAT UNSAT
: 2. Determine that 'B' service water pump inoperability had no Tech Spec implication.
Examinee correctly determined that 'A' and 'C' service water pumps being operable satisfied the Tech Spec requirement for two independent service water loops.
N/A SAT UNSAT (C)
: 3. Using form 1015.016Q, determine MTC for 325 EFPD to be approximately -1.4 X E-4 delta K/K/degree F.
Examinee correctly derived from graph based on 325 EFPD and 80% power curve that MTC is approximately
-1.4 X E-4 delta K/K/degree F.
N/A SAT UNSAT
N/A SAT UNSAT
: 2. Determine that 'B' service            Examinee correctly water pump inoperability had          determined that 'A' and 'C' no Tech Spec implication.              service water pumps being operable satisfied the Tech Spec requirement for two independent service water loops.
N/A SAT UNSAT (C)  3. Using form 1015.016Q,                  Examinee correctly derived determine MTC for 325 EFPD            from graph based on 325 to be approximately -1.4 X E-          EFPD and 80% power curve 4 delta K/K/degree F.                  that MTC is approximately
                                                -1.4 X E-4 delta K/K/degree F.


TUOI: ANO-2-JPM-NRC-MSSVINOP                                                     Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                           STANDARD                     (Circle One)
TUOI: ANO-2-JPM-NRC-MSSVINOP Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)
N/A SAT UNSAT (C) 4. Using Tech Spec 3.7.1 figure       Examinee correctly derived 3.7-1 determines new               from graph based on MTC of -
(C)
maximum power and RPS              1.4XE-4 delta K/K/degree F linear power trip setpoint to be  and knowing that one MSSV is 87.5% +/- 1%.                        inoperable determined that maximum power and RPS linear power trip setpoint should be 87.5% +/- 1%.
: 4. Using Tech Spec 3.7.1 figure 3.7-1 determines new maximum power and RPS linear power trip setpoint to be 87.5% +/- 1%.
Examinee correctly derived from graph based on MTC of -
1.4XE-4 delta K/K/degree F and knowing that one MSSV is inoperable determined that maximum power and RPS linear power trip setpoint should be 87.5% +/- 1%.
OR Examinee correctly interpolated from points given on the graph that maximum power and RPS linear power trip setpoint should be 87.5% +/-
OR Examinee correctly interpolated from points given on the graph that maximum power and RPS linear power trip setpoint should be 87.5% +/-
1%.
1%.
N/A SAT UNSAT
N/A SAT UNSAT
: 5. Determine that the CBOT           Examinee determined the calculation for maximum           maximum power and RPS power and RPS linear power        linear power trip setpoint trip setpoint is correct and       calculated by CBOT to be sign 1015.016B reviewed by         correct and signed 1015.016B blank.                            reviewed by blank.
: 5. Determine that the CBOT calculation for maximum power and RPS linear power trip setpoint is correct and sign 1015.016B reviewed by blank.
EXAMINER's NOTE: Examinee may discuss the Tech Spec applicability at this point stating that Tech Spec 3.7.1.1 LCO to allows power operations to continue provided that within 4 hours power is reduced to the maximum power of 79% or as allowed by figure 3.7-1 and within 12 hours, the RPS trip setpoint adjusted to be less than the value of 79% or as allowed in figure 3.7-1 per table 3.7-1, but this discussion is not required for successful completion of the JPM.
Examinee determined the maximum power and RPS linear power trip setpoint calculated by CBOT to be correct and signed 1015.016B reviewed by blank.
N/A SAT UNSAT EXAMINER's NOTE: Examinee may discuss the Tech Spec applicability at this point stating that Tech Spec 3.7.1.1 LCO to allows power operations to continue provided that within 4 hours power is reduced to the maximum power of 79% or as allowed by figure 3.7-1 and within 12 hours, the RPS trip setpoint adjusted to be less than the value of 79% or as allowed in figure 3.7-1 per table 3.7-1, but this discussion is not required for successful completion of the JPM.
END
END


TUOI: ANO-2-JPM-NRC-MSSVINOP                                                   Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
TUOI: ANO-2-JPM-NRC-MSSVINOP Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
* The plant is at 80% power, 325 EFPD, Steady State.
* The plant is at 80% power, 325 EFPD, Steady State.
* Plant refueling outage is expected to start in 36 hours.
* Plant refueling outage is expected to start in 36 hours.
Line 322: Line 443:
As oncoming CRS, based on initial conditions, verify the shift turnover checklist for correctness.
As oncoming CRS, based on initial conditions, verify the shift turnover checklist for correctness.


TUOI: ANO-2-JPM-NRC-MSSVINOP                                                   Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
TUOI: ANO-2-JPM-NRC-MSSVINOP Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
* The plant is at 80% power, 325 EFPD, Steady State.
* The plant is at 80% power, 325 EFPD, Steady State.
* Plant refueling outage is expected to start in 36 hours.
* Plant refueling outage is expected to start in 36 hours.
Line 334: Line 455:
As oncoming CRS, based on initial conditions, verify the shift turnover checklist for correctness.
As oncoming CRS, based on initial conditions, verify the shift turnover checklist for correctness.


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 1 OF 13 INSTRUCTIONS:
form title:
1.0       CIRCLE YES, NO OR N/A FOR EACH ITEM IN ANY DESIRED ORDER.
form no.
2.0         N/A ITEMS NOT APPLICABLE DUE TO MODE OR BEING ALIGNED TO OTHER TRAIN.
change no.
3.0         IF NO IS CIRCLED, THEN EXPLAIN IN THE REMARKS SECTION.
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
4.0         IF NO IS CIRCLED ON A TECH SPEC (TS) REQUIRED COMPONENT, THEN REFER TO ASSOCIATED TECH SPEC ACTION STATEMENT AND NOTIFY OPPOSITE UNIT, AS APPLICABLE.
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 1 OF 13 INSTRUCTIONS:
Mode:       1                   Date:         current               Time:           current A.           SDBCS ALIGNMENT (2C02)
1.0 CIRCLE YES, NO OR N/A FOR EACH ITEM IN ANY DESIRED ORDER.
: 1.       2CV-1002 (A S/G Upstream ADV Isol) closed                                                           YES     NO
2.0 N/A ITEMS NOT APPLICABLE DUE TO MODE OR BEING ALIGNED TO OTHER TRAIN.
: 2.       2CV-1052 (B S/G Upstream ADV Isol) closed                                                           YES     NO
3.0 IF NO IS CIRCLED, THEN EXPLAIN IN THE REMARKS SECTION.
: 3.       2CV-1001 (Upstream ADV) closed, HIC in Manual, permissive in Off                                   YES     NO
4.0 IF NO IS CIRCLED ON A TECH SPEC (TS) REQUIRED COMPONENT, THEN REFER TO ASSOCIATED TECH SPEC ACTION STATEMENT AND NOTIFY OPPOSITE UNIT, AS APPLICABLE.
: 4.       2CV-1051 (Upstream ADV) closed, HIC in Manual, permissive in Off                                   YES     NO
Mode:
: 5.       2CV-0301 (DDV) closed, HIC in Auto and permissive HS in Auto                                       YES     NO
1 Date:
: 6.       2CV-0305 (DDV) closed, HIC in Auto and permissive HS in Auto                                       YES     NO
current Time:
: 7.       2CV-0302 (Bypass Vlv) closed, HIC in Auto, permissive HS in Auto                                   YES     NO
current A.
: 8.       2CV-0303 (Bypass Vlv) closed, HIC in Auto, permissive HS in Auto                                   YES     NO
SDBCS ALIGNMENT (2C02) 1.
: 9.       2CV-0306 (Bypass Vlv) closed, HIC in Auto, permissive HS in Auto                                   YES     NO B.           SHUTDOWN COOLING (2C04)
2CV-1002 (A S/G Upstream ADV Isol) closed YES NO 2.
Two independent ECCS subsytems required operable in Mode 1, 2 & 3 with PZR pressure 1700 psia.
2CV-1052 (B S/G Upstream ADV Isol) closed YES NO 3.
(TS 3.5.2)
2CV-1001 (Upstream ADV) closed, HIC in Manual, permissive in Off YES NO 4.
: 1.       2CV-5091 (LPSI Disch Header) open.                                                                 YES NO N/A
2CV-1051 (Upstream ADV) closed, HIC in Manual, permissive in Off YES NO 5.
: 2.       2HS-5091 in ESF with the key removed.                                                               YES NO N/A
2CV-0301 (DDV) closed, HIC in Auto and permissive HS in Auto YES NO 6.
: 3.       2FIC-5091 (LPSI Disch Hdr Flow) in Auto & set at ~ 2400 gpm.                                       YES NO N/A form title:                                                                        form no.                change no.
2CV-0305 (DDV) closed, HIC in Auto and permissive HS in Auto YES NO 7.
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                                        1015.016  B  24-01-0
2CV-0302 (Bypass Vlv) closed, HIC in Auto, permissive HS in Auto YES NO 8.
2CV-0303 (Bypass Vlv) closed, HIC in Auto, permissive HS in Auto YES NO 9.
2CV-0306 (Bypass Vlv) closed, HIC in Auto, permissive HS in Auto YES NO B.
SHUTDOWN COOLING (2C04)
Two independent ECCS subsytems required operable in Mode 1, 2 & 3 with PZR pressure 1700 psia.
(TS 3.5.2) 1.
2CV-5091 (LPSI Disch Header) open.
YES NO N/A 2.
2HS-5091 in ESF with the key removed.
YES NO N/A 3.
2FIC-5091 (LPSI Disch Hdr Flow) in Auto & set at ~ 2400 gpm.
YES NO N/A


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 2 OF 13 C.         BORATION WATER SOURCES Each of the following borated water sources shall be operable: BAMT(s)
form title:
IAW 2104.003 Supplement 4 Figure 1 (TRM 3.1.2.8) and RWT. (TRM 3.1.2.8)
form no.
: 1.       BAM Tanks 2T-6A and/or 2T-6B in the acceptable region of                           YES    NO 2104.003 Supplement 4 Figure 1
change no.
: 2.       Boric Acid Tank (2T-6A) Temperature > 55°F                                         YES     NO
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
: 3.       Boric Acid Tank (2T-6B) Temperature > 55°F                                         YES     NO
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 2 OF 13 C.
: 4.       RWT Level 92% to 99%                                                               YES     NO
BORATION WATER SOURCES Each of the following borated water sources shall be operable: BAMT(s)
: 5.       RWT Boron Concentration 2500 to 3000 ppm                                           YES     NO
IAW 2104.003 Supplement 4 Figure 1 (TRM 3.1.2.8) and RWT. (TRM 3.1.2.8) 1.
: 6.       RWT Temperature 47 to 110°F (CR-2-00-687)                                         YES     NO Are required operable boron water sources available?                               YES     NO form title:                                                        form no.              change no.
BAM Tanks 2T-6A and/or 2T-6B in the acceptable region of 2104.003 Supplement 4 Figure 1 YES NO 2.
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                        1015.016 B  24-01-0
Boric Acid Tank (2T-6A) Temperature > 55°F YES NO 3.
Boric Acid Tank (2T-6B) Temperature > 55°F YES NO 4.
RWT Level 92% to 99%
YES NO 5.
RWT Boron Concentration 2500 to 3000 ppm YES NO 6.
RWT Temperature 47 to 110°F (CR-2-00-687)
YES NO Are required operable boron water sources available?
YES NO


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 3 OF 13 D.         BORATION FLOW PATHS AND COMPONENTS (2C09 AND 2C33)
form title:
form no.
change no.
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 3 OF 13 D.
BORATION FLOW PATHS AND COMPONENTS (2C09 AND 2C33)
At least two charging pumps required operable. (TRM 3.1.2.4)
At least two charging pumps required operable. (TRM 3.1.2.4)
At least one charging pump in the Boron Injection Flow Path required operable. (TRM 3.1.2.2)
At least one charging pump in the Boron Injection Flow Path required operable. (TRM 3.1.2.2) 1.
: 1.       2P-36A, associated room cooler, and room cooler SW valve operable.                                         YES     NO
2P-36A, associated room cooler, and room cooler SW valve operable.
: 2.       2P-36B, associated room cooler, and room cooler SW valve operable.                                         YES     NO
YES NO 2.
: 3.       2P-36C, associated room cooler and room cooler SW valve operable all powered from the same train           YES    NO (RED or GREEN).
2P-36B, associated room cooler, and room cooler SW valve operable.
: 4.       Boric Acid Pump (2P-39A) operable.                                                                         YES     NO
YES NO 3.
: 5.       Boric Acid Pump (2P-39B) operable.                                                                         YES     NO
2P-36C, associated room cooler and room cooler SW valve operable all powered from the same train (RED or GREEN).
: 6.       2CV-4916-2 (Emergency Borate) operable                                                                     YES     NO
YES NO 4.
: 7.       2CV-4920-1 (Gravity Feed) operable.                                                                       YES     NO
Boric Acid Pump (2P-39A) operable.
: 8.       2CV-4921-1 (Gravity Feed) operable.                                                                       YES     NO
YES NO 5.
: 9.       2CV-4950-2 (RWT to CCP suction) operable.                                                                 YES     NO
Boric Acid Pump (2P-39B) operable.
: 10.       2CV-4873-1 (VCT Outlet ) operable                                                                         YES     NO Circle Paths/component(s) for which credit taken (TRM 3.1.2.2)
YES NO 6.
2CV-4916-2 (Emergency Borate) operable YES NO 7.
2CV-4920-1 (Gravity Feed) operable.
YES NO 8.
2CV-4921-1 (Gravity Feed) operable.
YES NO 9.
2CV-4950-2 (RWT to CCP suction) operable.
YES NO 10.
2CV-4873-1 (VCT Outlet ) operable YES NO Circle Paths/component(s) for which credit taken (TRM 3.1.2.2)
ONE BAMT meets Volume Requirements - 2 of 3 paths required:
ONE BAMT meets Volume Requirements - 2 of 3 paths required:
* One flow path from the appropriate BAM tank via a BAM pump and a Charging pump.
* One flow path from the appropriate BAM tank via a BAM pump and a Charging pump.
Line 388: Line 540:
* One flow path from BAM tank A via Gravity Feed connection and Charging pump.
* One flow path from BAM tank A via Gravity Feed connection and Charging pump.
* One flow path from BAM tank B via Gravity Feed connection and Charging pump.
* One flow path from BAM tank B via Gravity Feed connection and Charging pump.
* One flow path from the RWT tank via a Charging pump.
One flow path from the RWT tank via a Charging pump.
Are required boron injection flow paths operable for the operable boron water source? (TRM 3.1.2.2)       YES     NO Are at least two charging pumps operable, one on each train?                                               YES    NO (TRM 3.1.2.4) form title:                                                                                form no.              change no.
Are required boron injection flow paths operable for the operable boron water source? (TRM 3.1.2.2)
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                                                1015.016  B  24-01-0
YES NO Are at least two charging pumps operable, one on each train?
(TRM 3.1.2.4)
YES NO


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 4 OF 13 E.       EMERGENCY DIESEL GENERATORS (2C33)
form title:
Two Diesel Generators are required operable. (TS 3.8.1.1)
form no.
: 1.       2DG1 Trouble/Not Available alarms clear                                                           YES     NO
change no.
: 2.       2HS-2809-1 (Engine Start) in Normal After Stop                                                     YES     NO
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
: 3.       2DG2 Trouble/Not Available alarms clear                                                           YES     NO
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 4 OF 13 E.
: 4.       2HS-2829-2 (Engine Start) in Normal After Stop                                                     YES     NO Are both EDGs operable?                                                                           YES     NO F.         AC ELECTRICAL SYSTEMS (2C10, 2C33 AND SPDS)
EMERGENCY DIESEL GENERATORS (2C33)
Two independent circuits between offsite transmission network and onsite ESF buses shall be operable. (TS 3.8.1.1)
Two Diesel Generators are required operable. (TS 3.8.1.1) 1.
2DG1 Trouble/Not Available alarms clear YES NO 2.
2HS-2809-1 (Engine Start) in Normal After Stop YES NO 3.
2DG2 Trouble/Not Available alarms clear YES NO 4.
2HS-2829-2 (Engine Start) in Normal After Stop YES NO Are both EDGs operable?
YES NO F.
AC ELECTRICAL SYSTEMS (2C10, 2C33 AND SPDS)
Two independent circuits between offsite transmission network and onsite ESF buses shall be operable.
(TS 3.8.1.1)
SU2 HS may be in PTL with breaker available.
SU2 HS may be in PTL with breaker available.
: 1.                                         Circle Operable Circuits RED                             GREEN SU2         SU3                   SU2     SU3 2A1         2A1                   2A2     2A2 2A3         2A3                   2A4     2A4 Are two physically independent circuits between the offsite                                       YES      NO transmission network and onsite ESF buses operable?
1.
Both trains of ESF Electrical buses shall be operable & energized with tie breakers open between redundant buses. (TS 3.8.2.1) 2RS1, 2, 3 & 4 are required to be operable. (TS 3.8.2.1)
Circle Operable Circuits RED GREEN SU2 SU3 SU2 SU3 2A1 2A1 2A2 2A2 2A3 2A3 2A4 2A4 Are two physically independent circuits between the offsite transmission network and onsite ESF buses operable?
: 2.                                         Circle Operable Circuits RED                                               GREEN 2A3                                                 2A4 2B5                                                 2B6 2B51                                                 2B61 2B52                                                 2B62 2B53                                                 2B63 2B54                                                 2B64 2RS1 ~ 120V on SPDS (Note)                             2RS2 ~ 120V on SPDS (Note) 2RS3 ~ 120V on SPDS (Note)                             2RS4 ~ 120V on SPDS (Note) 2RS1 inverter trouble                               2RS2 inverter trouble alarm clear                                           alarm clear 2RS3 inverter trouble                               2RS4 inverter trouble alarm clear                                           alarm clear 2A-310 IN PTL                                           2A-410 IN PTL 2B-513 IN PTL                                           2B-613 IN PTL Are both ESF electrical trains operable and energized with tie                                   YES        NO breakers open between redundant buses?
YES NO Both trains of ESF Electrical buses shall be operable & energized with tie breakers open between redundant buses.
Note: If a swing inverter is in service, then verify RS Panel voltage
(TS 3.8.2.1) 2RS1, 2, 3 & 4 are required to be operable.
    ~ 120V on SPDS using computer point E2RS1RS3 or E2RS2RS4.
(TS 3.8.2.1) 2.
form title:                                                                          form no.              change no.
Circle Operable Circuits RED GREEN 2A3 2A4 2B5 2B6 2B51 2B61 2B52 2B62 2B53 2B63 2B54 2B64 2RS1 ~ 120V on SPDS (Note) 2RS2 ~ 120V on SPDS (Note) 2RS3 ~ 120V on SPDS (Note) 2RS4 ~ 120V on SPDS (Note) 2RS1 inverter trouble 2RS2 inverter trouble alarm clear alarm clear 2RS3 inverter trouble 2RS4 inverter trouble alarm clear alarm clear 2A-310 IN PTL 2A-410 IN PTL 2B-513 IN PTL 2B-613 IN PTL Are both ESF electrical trains operable and energized with tie breakers open between redundant buses?
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                                          1015.016 B  24-01-0
YES NO Note: If a swing inverter is in service, then verify RS Panel voltage
~ 120V on SPDS using computer point E2RS1RS3 or E2RS2RS4.


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 5 OF 13 G.           DC ELECTRICAL SYSTEMS (2C10, 2C33 AND SPDS)
form title:
form no.
change no.
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 5 OF 13 G.
DC ELECTRICAL SYSTEMS (2C10, 2C33 AND SPDS)
Both trains of DC electrical sources shall be operable with each train consisting of a 125 VDC bus, a battery bank & a full capacity charger. (TS 3.8.2.3)
Both trains of DC electrical sources shall be operable with each train consisting of a 125 VDC bus, a battery bank & a full capacity charger. (TS 3.8.2.3)
DC Buses are verified operable by checking corresponding Undervoltage, Not Available, and Trouble alarms clear and bus voltage normal (~130V) on SPDS.
DC Buses are verified operable by checking corresponding Undervoltage, Not Available, and Trouble alarms clear and bus voltage normal (~130V) on SPDS.
Circle Operable Trains RED                       GREEN 2DO1                       2D02 2D11                       2D12 2D31A OR 2D31B             2D32A OR 2D32B Are both trains of DC electrical sources operable?                                                         YES     NO H.         CONTROL ROOM EMERGENCY AIR CONDITIONING AND VENTILATION SYSTEMS (2C33, C19 AND LOCAL)
Circle Operable Trains RED GREEN 2DO1 2D02 2D11 2D12 2D31A OR 2D31B 2D32A OR 2D32B Are both trains of DC electrical sources operable?
YES NO H.
CONTROL ROOM EMERGENCY AIR CONDITIONING AND VENTILATION SYSTEMS (2C33, C19 AND LOCAL)
Two independent Control Room Emergency Air Conditioning and Air Filtration Systems are required operable.
Two independent Control Room Emergency Air Conditioning and Air Filtration Systems are required operable.
(Unit 2 TS 3.3.3.1, Table 3.3-6, 3.7.6.1 and TRM 3.3.3.7 and Unit 1 TS 3.5.1.13, Table 3.5.1-1, 3.9.1, 3.9.2 and TRM 3.5.1)
(Unit 2 TS 3.3.3.1, Table 3.3-6, 3.7.6.1 and TRM 3.3.3.7 and Unit 1 TS 3.5.1.13, Table 3.5.1-1, 3.9.1, 3.9.2 and TRM 3.5.1) 1.
: 1.       2VSF-9 operable and handswitch in AUTO.                                                                     YES     NO
2VSF-9 operable and handswitch in AUTO.
: 2.       2VE-1A and 2VUC-27A operable.                                                                               YES     NO
YES NO 2.
: 3.       2VE-1B and 2VUC-27B operable.                                                                               YES     NO
2VE-1A and 2VUC-27A operable.
: 4.       At least one Control Room Rad Monitor (2RITS-8750-1A or                                                     YES      NO 2RITS-8750-1B) operable and indicating between minimum and maximum values from OPS B-28 and OPS B-43. (TS 3.3.3.1)
YES NO 3.
: 5.       Both 2DG1 and 2DG2 operable                                                                                 YES     NO
2VE-1B and 2VUC-27B operable.
: 6.       ESF Buses separated (NOT cross-tied)                                                                       YES     NO
YES NO 4.
: 7.       Chlorine Monitors operable (Unit 2 TRM 3.3.3.7, Unit 1 TRM 3.5.1)                                           YES     NO
At least one Control Room Rad Monitor (2RITS-8750-1A or 2RITS-8750-1B) operable and indicating between minimum and maximum values from OPS B-28 and OPS B-43.
: 8.       VSF-9 operable and handswitch in Auto.                                                                     YES     NO
(TS 3.3.3.1)
: 9.       VSF-9 aligned to operable EDG power source.                                                                 YES     NO
YES NO 5.
: 10.       At least one Unit One CR Rad Monitor operable.                                                             YES      NO (2RITS-8001A or 2RITS-8001B)
Both 2DG1 and 2DG2 operable YES NO 6.
Are required CR Emergency Air Conditioning and Filtration                                                   YES      NO Systems operable?
ESF Buses separated (NOT cross-tied)
If NO is circled, then notify Unit 1 of equipment status and refer to Tech Specs.
YES NO 7.
: 11.       Control Room Emergency AC units (2VUC-27A & 2VUC-27B) drain loop seals (2SG-8600A and 2SG-8600B) indicate > 1.5 H2O above bottom of                                         YES      NO sightglass?
Chlorine Monitors operable (Unit 2 TRM 3.3.3.7, Unit 1 TRM 3.5.1)
* Add water at 1.5 H2O
YES NO 8.
* Initiate Condition Report at 1 H2O
VSF-9 operable and handswitch in Auto.
YES NO 9.
VSF-9 aligned to operable EDG power source.
YES NO 10.
At least one Unit One CR Rad Monitor operable.
(2RITS-8001A or 2RITS-8001B)
YES NO Are required CR Emergency Air Conditioning and Filtration Systems operable?
YES NO If NO is circled, then notify Unit 1 of equipment status and refer to Tech Specs.
11.
Control Room Emergency AC units (2VUC-27A & 2VUC-27B) drain loop seals (2SG-8600A and 2SG-8600B) indicate > 1.5 H2O above bottom of sightglass?
Add water at 1.5 H2O Initiate Condition Report at 1 H2O
[ER002956E202, CR-ANO-C-2001-0175]
[ER002956E202, CR-ANO-C-2001-0175]
form title:                                                                                  form no.              change no.
YES NO
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                                                  1015.016  B  24-01-0


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 6 OF 13 I.         EMERGENCY FEEDWATER Two EFW pumps and associated flow paths are required operable in Mode 1, 2 & 3. (TS 3.7.1.2) All valves except 2CV-0707 and 2CV-1532-1 must be energized. 2CV-0711-2 (2P-7A Suction from SW)/2CV-0716-1 (2P-7B Suction from SW) checked OPEN or OPERABLE is required for surveillance action if SW is supply to EFW (TS 4.7.1.3.2) 2C33
form title:
: 1.       2CV-0707 - Heaters removed, valve open. Check open by either remote or local position indication.     YES NO N/A
form no.
: 2.       2EFW-0706 (SU/BD Demin Effluent to EFW) closed when > 10%.                                             YES NO N/A 2C17
change no.
: 3.       2CV-1000-1 (Main Steam to EFWP Turbine 2K-3) open.                                                     YES NO N/A
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
: 4.       2CV-1038-2 (2P-7B Discharge to S/G A) open.                                                           YES NO N/A
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 6 OF 13 I.
: 5.       2CV-1036-2 (2P-7B Discharge to S/G B) open.                                                           YES NO N/A
EMERGENCY FEEDWATER Two EFW pumps and associated flow paths are required operable in Mode 1, 2 & 3. (TS 3.7.1.2) All valves except 2CV-0707 and 2CV-1532-1 must be energized. 2CV-0711-2 (2P-7A Suction from SW)/2CV-0716-1 (2P-7B Suction from SW) checked OPEN or OPERABLE is required for surveillance action if SW is supply to EFW (TS 4.7.1.3.2) 2C33 1.
: 6.       2CV-1025-1 (2P-7B Flow Control to S/G A) closed.                                                       YES NO N/A
2CV-0707 - Heaters removed, valve open. Check open by either remote or local position indication.
: 7.       2CV-1075-1 (2P-7B Flow Control to S/G B) closed.                                                       YES NO N/A
YES NO N/A 2.
: 8.       2CV-0716-1 (2P-7B Suction From SW) closed.                                                             YES NO N/A
2EFW-0706 (SU/BD Demin Effluent to EFW) closed when > 10%.
: 9.       2CV-0789-1 (2P-7B Suction From CST) open.                                                             YES NO N/A
YES NO N/A 2C17 3.
: 10.       EFW Pump 2P-7B operable.                                                                               YES NO N/A
2CV-1000-1 (Main Steam to EFWP Turbine 2K-3) open.
: 11.       EFW Pump 2P-7B Room Cooler 2VUC-6B operable. (CR-ANO-2-2000-0109)                                     YES NO N/A
YES NO N/A 4.
: 12.       EFW Pump 2P-7B Room Cooler 2VUC-6B SW MOV 2CV-1532-1 operable OR                                       YES NO N/A de-energized open. (CR-ANO-2-2000-0109) 2C16
2CV-1038-2 (2P-7B Discharge to S/G A) open.
: 13.       2CV-1050-2 (Main Steam to EFWP Turbine 2K-3) open.                                                     YES NO N/A
YES NO N/A 5.
: 14.       2CV-1026-2 (2P-7A Discharge to S/G A) closed.                                                         YES NO N/A
2CV-1036-2 (2P-7B Discharge to S/G B) open.
: 15.       2CV-1076-2 (2P-7A Discharge to S/G B) closed.                                                         YES NO N/A
YES NO N/A 6.
: 16.       2CV-1037-1 (2P-7A Discharge to S/G A) open.                                                           YES NO N/A
2CV-1025-1 (2P-7B Flow Control to S/G A) closed.
: 17.       2CV-1039-1 (2P-7A Discharge to S/G B) open.                                                           YES NO N/A
YES NO N/A 7.
: 18.       2CV-0340-2 (Steam to EFWP Turbine 2K-3) closed.                                                       YES NO N/A
2CV-1075-1 (2P-7B Flow Control to S/G B) closed.
: 19.       2CV-0711-2 (2P-7A Suction from SW) closed.                                                             YES NO N/A
YES NO N/A 8.
: 20.       2CV-0795-2 (2P-7A Suction from CST) open.                                                             YES NO N/A Are required EFW pumps and associated flow paths operable?                                             YES NO N/A form title:                                                                            form no.                change no.
2CV-0716-1 (2P-7B Suction From SW) closed.
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                                            1015.016    B  24-01-0
YES NO N/A 9.
2CV-0789-1 (2P-7B Suction From CST) open.
YES NO N/A 10.
EFW Pump 2P-7B operable.
YES NO N/A 11.
EFW Pump 2P-7B Room Cooler 2VUC-6B operable. (CR-ANO-2-2000-0109)
YES NO N/A 12.
EFW Pump 2P-7B Room Cooler 2VUC-6B SW MOV 2CV-1532-1 operable OR de-energized open. (CR-ANO-2-2000-0109)
YES NO N/A 2C16 13.
2CV-1050-2 (Main Steam to EFWP Turbine 2K-3) open.
YES NO N/A 14.
2CV-1026-2 (2P-7A Discharge to S/G A) closed.
YES NO N/A 15.
2CV-1076-2 (2P-7A Discharge to S/G B) closed.
YES NO N/A 16.
2CV-1037-1 (2P-7A Discharge to S/G A) open.
YES NO N/A 17.
2CV-1039-1 (2P-7A Discharge to S/G B) open.
YES NO N/A 18.
2CV-0340-2 (Steam to EFWP Turbine 2K-3) closed.
YES NO N/A 19.
2CV-0711-2 (2P-7A Suction from SW) closed.
YES NO N/A 20.
2CV-0795-2 (2P-7A Suction from CST) open.
YES NO N/A Are required EFW pumps and associated flow paths operable?
YES NO N/A


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 7 OF 13 J.         CONTAINMENT PENETRATION ROOM EXHAUST VENTILATION Maintain either 2VEF-38A or 2VEF-38B in PTL to prevent both fans from auto starting on CIAS (CR-2-93-0061).
form title:
Circle Fan Status 2VEF-38A:                       AUTO           PTL 2VEF-38B:                       AUTO           PTL
form no.
: 1.       Is ONE Penetration Room Exhaust Fan in AUTO and ONE in PTL?                           YES     NO K.           CONTAINMENT COOLING SYSTEM Two independent Containment Cooling groups are required operable (TS 3.6.2.3), both fans in a group are required for that group to be operable. Valves must be energized.
change no.
2C17
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
: 1.       CNTMT Cooling Fan 2VSF-1B operable.                                                   YES     NO
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 7 OF 13 J.
: 2.       2CV-1519-1 (2VSF-1A/1B SW Outlet) closed.                                             YES     NO
CONTAINMENT PENETRATION ROOM EXHAUST VENTILATION Maintain either 2VEF-38A or 2VEF-38B in PTL to prevent both fans from auto starting on CIAS (CR-2-93-0061).
: 3.       2CV-1511-1 (2VSF-1A/B SW Inlet) closed.                                               YES     NO
Circle Fan Status 2VEF-38A:
: 4.       2SV-1511-1 (SW Bypass for 2CV-1511-1) open.                                           YES     NO
AUTO PTL 2VEF-38B:
: 5.       CNTMT Cooling Fan 2VSF-1A operable.                                                   YES     NO 2C16
AUTO PTL 1.
: 6.       CNTMT Cooling Fan 2VSF-1D operable.                                                   YES     NO
Is ONE Penetration Room Exhaust Fan in AUTO and ONE in PTL?
: 7.       2CV-1513-2 (2VSF-1C/D SW Outlet) closed.                                             YES     NO
YES NO K.
: 8.       2CV-1510-2 (2VSF-1C/D SW Inlet) closed.                                               YES     NO
CONTAINMENT COOLING SYSTEM Two independent Containment Cooling groups are required operable (TS 3.6.2.3), both fans in a group are required for that group to be operable.
: 9.       2SV-1510-2 (SW Bypass for 2CV-1510-2) open.                                           YES     NO
Valves must be energized.
: 10.       CNTMT Cooling Fan 2VSF-1C operable.                                                   YES     NO Are required Containment Cooling groups operable?                                     YES     NO form title:                                                            form no.              change no.
2C17 1.
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                            1015.016 B  24-01-0
CNTMT Cooling Fan 2VSF-1B operable.
YES NO 2.
2CV-1519-1 (2VSF-1A/1B SW Outlet) closed.
YES NO 3.
2CV-1511-1 (2VSF-1A/B SW Inlet) closed.
YES NO 4.
2SV-1511-1 (SW Bypass for 2CV-1511-1) open.
YES NO 5.
CNTMT Cooling Fan 2VSF-1A operable.
YES NO 2C16 6.
CNTMT Cooling Fan 2VSF-1D operable.
YES NO 7.
2CV-1513-2 (2VSF-1C/D SW Outlet) closed.
YES NO 8.
2CV-1510-2 (2VSF-1C/D SW Inlet) closed.
YES NO 9.
2SV-1510-2 (SW Bypass for 2CV-1510-2) open.
YES NO 10.
CNTMT Cooling Fan 2VSF-1C operable.
YES NO Are required Containment Cooling groups operable?
YES NO


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 8 OF 13 L.         SAFETY INJECTION TANKS SIT isolation valves are required to be open in Mode 1, 2 & 3 with PZR pressure 700 psia (TS 4.5.1.a.2) 2C17
form title:
: 1.       2CV-5003-1 (SIT 2T-2A Outlet) locked open, key removed.                                           YES NO N/A
form no.
: 2.       2CV-5023-1 (SIT 2T-2B Outlet) locked open, key removed.                                           YES NO N/A 2C16
change no.
: 3.       2CV-5043-2 (SIT 2T-2C Outlet) locked open, key removed.                                           YES NO N/A
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
: 4.       2CV-5063-2 (SIT 2T-2D Outlet) locked open, key removed.                                           YES NO N/A Are all required SIT outlet valves open?                                                           YES NO N/A M.         LOW PRESSURE SAFETY INJECTION Two independent ECCS subsystems are required in Mode 1, 2 & 3 with PZR pressure 1700 psia (TS 3.5.2) Valves Must Be Energized 2C17
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 8 OF 13 L.
: 1.       2CV-5017-1 (LPSI to 2P-32A Loop) closed.                                                           YES NO N/A
SAFETY INJECTION TANKS SIT isolation valves are required to be open in Mode 1, 2 & 3 with PZR pressure 700 psia (TS 4.5.1.a.2) 2C17 1.
: 2.       LPSI Pump 2P-60A operable.                                                                         YES NO N/A
2CV-5003-1 (SIT 2T-2A Outlet) locked open, key removed.
: 3.       2CV-5037-1 (LPSI to 2P-32B Loop) closed.                                                           YES NO N/A 2C16
YES NO N/A 2.
: 4.       2CV-5057-2 (LPSI to 2P-32C Loop) closed.                                                           YES NO N/A
2CV-5023-1 (SIT 2T-2B Outlet) locked open, key removed.
: 5.       LPSI Pump 2P-60B operable.                                                                         YES NO N/A
YES NO N/A 2C16 3.
: 6.       2CV-5077-2 (LPSI to 2P-32D Loop) closed.                                                           YES NO N/A Are required ECCS subsystems (LPSI) operable?                                                     YES NO N/A form title:                                                                          form no.              change no.
2CV-5043-2 (SIT 2T-2C Outlet) locked open, key removed.
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                                          1015.016  B  24-01-0
YES NO N/A 4.
2CV-5063-2 (SIT 2T-2D Outlet) locked open, key removed.
YES NO N/A Are all required SIT outlet valves open?
YES NO N/A M.
LOW PRESSURE SAFETY INJECTION Two independent ECCS subsystems are required in Mode 1, 2 & 3 with PZR pressure 1700 psia (TS 3.5.2) Valves Must Be Energized 2C17 1.
2CV-5017-1 (LPSI to 2P-32A Loop) closed.
YES NO N/A 2.
LPSI Pump 2P-60A operable.
YES NO N/A 3.
2CV-5037-1 (LPSI to 2P-32B Loop) closed.
YES NO N/A 2C16 4.
2CV-5057-2 (LPSI to 2P-32C Loop) closed.
YES NO N/A 5.
LPSI Pump 2P-60B operable.
YES NO N/A 6.
2CV-5077-2 (LPSI to 2P-32D Loop) closed.
YES NO N/A Are required ECCS subsystems (LPSI) operable?
YES NO N/A


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 9 OF 13 N.         HIGH PRESSURE SAFETY INJECTION Two independent ECCS subsystems are required in Modes 1, 2 & 3 with PZR pressure 1700 psia (TS 3.5.2). One ECCS subsystem is required in Modes 3 & 4 with PZR pressure < 1700 psia (TS 3.5.3).
form title:
form no.
change no.
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 9 OF 13 N.
HIGH PRESSURE SAFETY INJECTION Two independent ECCS subsystems are required in Modes 1, 2 & 3 with PZR pressure 1700 psia (TS 3.5.2). One ECCS subsystem is required in Modes 3 & 4 with PZR pressure < 1700 psia (TS 3.5.3).
Valves must be energized except 2CV-5101-1 and 2CV-5102-2.
Valves must be energized except 2CV-5101-1 and 2CV-5102-2.
2C17
2C17 1.
: 1.       2CV-5630-1 (RWT 2T-3 Outlet) open                                                                         YES NO N/A
2CV-5630-1 (RWT 2T-3 Outlet) open YES NO N/A 2.
: 2.       2CV-5101-1 (HPSI HDR #1 Hot Leg Injection) closed                                                         YES NO N/A
2CV-5101-1 (HPSI HDR #1 Hot Leg Injection) closed YES NO N/A 3.
: 3.       2CV-5015-1 (HPSI HDR #1 to 2P-32A Loop) closed                                                           YES NO N/A
2CV-5015-1 (HPSI HDR #1 to 2P-32A Loop) closed YES NO N/A 4.
: 4.       2CV-5035-1 (HPSI HDR #1 to 2P-32B Loop) closed                                                           YES NO N/A
2CV-5035-1 (HPSI HDR #1 to 2P-32B Loop) closed YES NO N/A 5.
: 5.       2CV-5055-1 (HPSI HDR #1 to 2P-32C Loop) closed                                                           YES NO N/A
2CV-5055-1 (HPSI HDR #1 to 2P-32C Loop) closed YES NO N/A 6.
: 6.       2CV-5075-1 (HPSI HDR #1 to 2P-32D Loop) closed                                                           YES NO N/A
2CV-5075-1 (HPSI HDR #1 to 2P-32D Loop) closed YES NO N/A 7.
: 7.       2P-89C operable if aligned to A header (If not required for auto start, then HS in PTL.)                 YES NO N/A
2P-89C operable if aligned to A header (If not required for auto start, then HS in PTL.)
: 8.       2P-89A operable (If not required for auto start, then HS in PTL.)                                         YES NO N/A
YES NO N/A 8.
: 9.       2CV-5647-1 (CNTMT Sump Suction Isol) locked open, key removed)                                           YES NO N/A
2P-89A operable (If not required for auto start, then HS in PTL.)
: 10.       2CV-5649-1 (CNTMT Sump Suction Isol) closed                                                               YES NO N/A 2C16
YES NO N/A 9.
: 11.       2CV-5631-2 (RWT 2T-3 outlet) open                                                                         YES NO N/A
2CV-5647-1 (CNTMT Sump Suction Isol) locked open, key removed)
: 12.       2CV-5102-2 (HPSI HDR #2 Hot Leg Injection) closed                                                         YES NO N/A
YES NO N/A 10.
: 13.       2CV-5016-2 (HPSI HDR #2 to 2P-32A Loop) closed                                                           YES NO N/A
2CV-5649-1 (CNTMT Sump Suction Isol) closed YES NO N/A 2C16 11.
: 14.       2CV-5036-2 (HPSI HDR #2 to 2P-32B Loop) closed                                                           YES NO N/A
2CV-5631-2 (RWT 2T-3 outlet) open YES NO N/A 12.
: 15.       2CV-5056-2 (HPSI HDR #2 to 2P-32C Loop) closed                                                           YES NO N/A
2CV-5102-2 (HPSI HDR #2 Hot Leg Injection) closed YES NO N/A 13.
: 16.       2CV-5076-2 (HPSI HDR #2 to 2P-32D Loop) closed                                                           YES NO N/A
2CV-5016-2 (HPSI HDR #2 to 2P-32A Loop) closed YES NO N/A 14.
: 17.       2P-89C operable if aligned to B header (If not required for auto start, then HS in PTL.)                 YES NO N/A
2CV-5036-2 (HPSI HDR #2 to 2P-32B Loop) closed YES NO N/A 15.
: 18.       2P-89B operable (If not required for auto start, then HS in PTL.)                                         YES NO N/A
2CV-5056-2 (HPSI HDR #2 to 2P-32C Loop) closed YES NO N/A 16.
: 19.       2CV-5648-2 (CNTMT Sump Suction Isol) locked open, key removed                                             YES NO N/A
2CV-5076-2 (HPSI HDR #2 to 2P-32D Loop) closed YES NO N/A 17.
: 20.       2CV-5650-2 (CNTMT Sump Suction Isol) closed                                                               YES NO N/A Are required ECCS (HPSI) subsystems operable?                                                           YES NO form title:                                                                                  form no.              change no.
2P-89C operable if aligned to B header (If not required for auto start, then HS in PTL.)
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                                                  1015.016 B  24-01-0
YES NO N/A 18.
2P-89B operable (If not required for auto start, then HS in PTL.)
YES NO N/A 19.
2CV-5648-2 (CNTMT Sump Suction Isol) locked open, key removed YES NO N/A 20.
2CV-5650-2 (CNTMT Sump Suction Isol) closed YES NO N/A Are required ECCS (HPSI) subsystems operable?
YES NO


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 10 OF 13 O.         SERVICE WATER (2C16 AND 2C17)
form title:
form no.
change no.
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 10 OF 13 O.
SERVICE WATER (2C16 AND 2C17)
Two independent SW loops are required operable (TS 3.7.3.1)
Two independent SW loops are required operable (TS 3.7.3.1)
Valves Must Be Energized 2C17
Valves Must Be Energized 2C17 1.
: 1.       2CV-1453-1 (SDC HX 2E-35A SW Inlet) closed                                             YES NO
2CV-1453-1 (SDC HX 2E-35A SW Inlet) closed YES NO 2.
: 2.       SW Pump 2P-4B - Disconnect closed if aligned to Loop 1                                 YES NO N/A 1
SW Pump 2P-4B - Disconnect closed if aligned to Loop 1 YES NO N/A 1 3.
: 3.       SW Pump 2P-4B powered from RED train and operable                                     YES NO N/A
SW Pump 2P-4B powered from RED train and operable YES NO N/A 4.
: 4.       SW Pump 2P-4A operable                                                                 YES NO
SW Pump 2P-4A operable YES NO 5.
: 5.       2CV-1400-1 (SW ESF Header Isol) open                                                   YES NO
2CV-1400-1 (SW ESF Header Isol) open YES NO 6.
: 6.       2CV-1541-1 (SW Return to ECP) closed                                                   YES NO 2C16
2CV-1541-1 (SW Return to ECP) closed YES NO 2C16 7.
: 7.       2CV-1456-2 (SDC HX 2E-35B SW Inlet) closed                                             YES NO
2CV-1456-2 (SDC HX 2E-35B SW Inlet) closed YES NO 8.
: 8.       SW Pump 2P-4B - Disconnect closed if aligned to Loop 2                                 YES NO N/A
SW Pump 2P-4B - Disconnect closed if aligned to Loop 2 YES NO N/A 9.
: 9.       SW Pump 2P-4B powered from GREEN train and operable.                                   YES NO N/A
SW Pump 2P-4B powered from GREEN train and operable.
: 10.       SW Pump 2P-4C operable                                                                 YES NO
YES NO N/A 10.
: 11.       2CV-1406-2 (SW ESF Header Isol) open                                                   YES NO
SW Pump 2P-4C operable YES NO 11.
: 12.       2CV-1560-2 (SW Return to ECP) closed                                                   YES NO Are required SW pumps and loops operable?                                             YES NO P.         ESF PUMP RECIRCS Two independent ECCS subsystems are required operable in Mode 1, 2 & 3 with PZR pressure > 1700 psia (TS 3.5.2).
2CV-1406-2 (SW ESF Header Isol) open YES NO 12.
One ECCS subsystem is required operable in Modes 3 & 4 with PZR pressure < 1700 psia (TS 3.5.3). Valves must be energized.
2CV-1560-2 (SW Return to ECP) closed YES NO Are required SW pumps and loops operable?
: 1.       2CV-5123-1 (LPSI 2P-60A Recirc Isol) open                                               YES NO N/A
YES NO P.
: 2.       2CV-5673-1 (CNTMT Spray 2P-35A Recirc Isol) open                                       YES NO N/A
ESF PUMP RECIRCS Two independent ECCS subsystems are required operable in Mode 1, 2 & 3 with PZR pressure > 1700 psia (TS 3.5.2).
: 3.       2CV-5124-1 (LPSI 2P-60B Recirc Isol) open                                               YES NO N/A
One ECCS subsystem is required operable in Modes 3 & 4 with PZR pressure < 1700 psia (TS 3.5.3).
: 4.       2CV-5672-1 (CNTMT Spray 2P-35B Recirc Isol) open                                       YES NO N/A
Valves must be energized.
: 5.       2CV-5126-1 (HPSI 2P-89A Recirc Isol) open                                               YES NO N/A
1.
: 6.       2CV-5128-1 (HPSI 2P-89B Recirc Isol) open                                               YES NO N/A
2CV-5123-1 (LPSI 2P-60A Recirc Isol) open YES NO N/A 2.
: 7.       2CV-5127-1 (HPSI 2P-89C Recirc Isol) open                                               YES NO N/A
2CV-5673-1 (CNTMT Spray 2P-35A Recirc Isol) open YES NO N/A 3.
: 8.       2CV-5628-2 (ESF Mini-Recirc Header Isol) open                                           YES NO N/A Are required ESF recirc valves open?                                                   YES NO form title:                                                                form no.              change no.
2CV-5124-1 (LPSI 2P-60B Recirc Isol) open YES NO N/A 4.
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                                1015.016 B    24-01-0
2CV-5672-1 (CNTMT Spray 2P-35B Recirc Isol) open YES NO N/A 5.
2CV-5126-1 (HPSI 2P-89A Recirc Isol) open YES NO N/A 6.
2CV-5128-1 (HPSI 2P-89B Recirc Isol) open YES NO N/A 7.
2CV-5127-1 (HPSI 2P-89C Recirc Isol) open YES NO N/A 8.
2CV-5628-2 (ESF Mini-Recirc Header Isol) open YES NO N/A Are required ESF recirc valves open?
YES NO


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 11 OF 13 Q.         CONTAINMENT SPRAY SYSTEM Two independent Containment Spray Systems are required operable in Modes 1, 2 & 3 (TS 3.6.2.1)                 Valves Must Be Energized 2C17
form title:
: 1.       2CV-5612-1 (CNTMT Spray Header Isol) closed                                                           YES NO N/A
form no.
: 2.       CNTMT Spray Pump 2P-35A operable                                                                       YES NO N/A
change no.
: 3.       2CV-5647-1 (CNTMT Sump Suction Isol) locked open, key removed                                         YES NO N/A
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
: 4.       2CV-5649-1 (CNTMT Sump Suction Isol) closed                                                           YES NO N/A 2C16
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 11 OF 13 Q.
: 5.       2CV-5613-2 (CNTMT Spray Header Isol) closed                                                           YES NO N/A
CONTAINMENT SPRAY SYSTEM Two independent Containment Spray Systems are required operable in Modes 1, 2 & 3 (TS 3.6.2.1)
: 6.       CNTMT Spray Pump 2P-35B operable                                                                       YES NO N/A
Valves Must Be Energized 2C17 1.
: 7.       2CV-5648-2 (CNTMT Sump Suction Isol) locked open, key removed                                         YES NO N/A
2CV-5612-1 (CNTMT Spray Header Isol) closed YES NO N/A 2.
: 8.       2CV-5650-2 (CNTMT Sump Suction Isol) closed                                                           YES NO N/A Are required Spray Systems operable?                                                                   YES NO N/A R.         CONTAINMENT FIREWATER (2C16)
CNTMT Spray Pump 2P-35A operable YES NO N/A 3.
2CV-5647-1 (CNTMT Sump Suction Isol) locked open, key removed YES NO N/A 4.
2CV-5649-1 (CNTMT Sump Suction Isol) closed YES NO N/A 2C16 5.
2CV-5613-2 (CNTMT Spray Header Isol) closed YES NO N/A 6.
CNTMT Spray Pump 2P-35B operable YES NO N/A 7.
2CV-5648-2 (CNTMT Sump Suction Isol) locked open, key removed YES NO N/A 8.
2CV-5650-2 (CNTMT Sump Suction Isol) closed YES NO N/A Are required Spray Systems operable?
YES NO N/A R.
CONTAINMENT FIREWATER (2C16)
Containment penetration firewater system is required operable. (Fire Spec 9D.3, 1000.152) Valve Must Be Energized.
Containment penetration firewater system is required operable. (Fire Spec 9D.3, 1000.152) Valve Must Be Energized.
: 1.       2CV-3200-2 (CNTMT Firewater Isol) closed                                                                 YES     NO form title:                                                                              form no.              change no.
1.
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                                              1015.016 B    24-01-0
2CV-3200-2 (CNTMT Firewater Isol) closed YES NO


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 12 OF 13 S.         HIGH POINT VENTS (2C336-1 AND 2C336-2)
form title:
Position verification per NUREG-0737 Item II.B.1
form no.
: 1.       2HS-4671-1 (High Point Vents Control Power) On                                                       YES     NO
change no.
: 2.       2SV-4668-1 (Rx Head Vent) Closed                                                                     YES     NO
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
: 3.       2SV-4636-1 (Pressurizer Vent) Closed                                                                 YES     NO
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 12 OF 13 S.
: 4.       2SV-4669-1 (Vent to Quench Tank) Closed                                                               YES     NO
HIGH POINT VENTS (2C336-1 AND 2C336-2)
: 5.       2HS-4671-2 (High Point Vents Control Power) On                                                       YES     NO
Position verification per NUREG-0737 Item II.B.1 1.
: 6.       2SV-4668-2 (Rx Head Vent) Closed                                                                     YES     NO
2HS-4671-1 (High Point Vents Control Power) On YES NO 2.
: 7.       2SV-4636-2 (Pressurizer Vent) Closed                                                                 YES     NO
2SV-4668-1 (Rx Head Vent) Closed YES NO 3.
: 8.       2SV-4670-2 (Vent to CNTMT Atmosphere) Closed                                                         YES     NO T.         FUSE BLOCKS
2SV-4636-1 (Pressurizer Vent) Closed YES NO 4.
: 1.       2C16 Fuse blocks (2) - Fuses not blown.                                                               YES     NO
2SV-4669-1 (Vent to Quench Tank) Closed YES NO 5.
: 2.       2C17 Fuse blocks (2) - Fuses not blown.                                                               YES     NO
2HS-4671-2 (High Point Vents Control Power) On YES NO 6.
: 3.       2C33-1 Fuse blocks (1) - Fuses not blown.                                                             YES     NO
2SV-4668-2 (Rx Head Vent) Closed YES NO 7.
: 4.       2C33-2 Fuse blocks (1) - Fuses not blown.                                                             YES     NO U.         ANNUNCIATORS
2SV-4636-2 (Pressurizer Vent) Closed YES NO 8.
: 1.       Annunciator test for all Control Room Annunciators completed?.                                       YES     NO
2SV-4670-2 (Vent to CNTMT Atmosphere) Closed YES NO T.
: 2.       Alarms acknowledged on all reflash units 2C10(1); 2C11(1); 2C14(5); 2C16(1); 2C17(1); 2C32(1);       YES      NO 2C33(3)
FUSE BLOCKS 1.
: 3.       All annunciator disabling toggle switches ON (UP)?                                                   YES     NO V.         FIRE BRIGADE
2C16 Fuse blocks (2) - Fuses not blown.
: 1.       Qualified Fire Brigade assigned?                                                                     YES     NO form title:                                                                            form no.              change no.
YES NO 2.
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                                            1015.016 B    24-01-0
2C17 Fuse blocks (2) - Fuses not blown.
YES NO 3.
2C33-1 Fuse blocks (1) - Fuses not blown.
YES NO 4.
2C33-2 Fuse blocks (1) - Fuses not blown.
YES NO U.
ANNUNCIATORS 1.
Annunciator test for all Control Room Annunciators completed?.
YES NO 2.
Alarms acknowledged on all reflash units 2C10(1); 2C11(1); 2C14(5); 2C16(1); 2C17(1); 2C32(1);
2C33(3)
YES NO 3.
All annunciator disabling toggle switches ON (UP)?
YES NO V.
FIRE BRIGADE 1.
Qualified Fire Brigade assigned?
YES NO


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 13 OF 13 W.         MAIN STEAM AND MAIN FEEDWATER
form title:
: 1.       IF MSSV(s) inoperable, THEN perform the following:
form no.
ST 2 A. Refer to 1015.016Q (MTC vs EFPD AND POWER) to obtain limiting MTC value B. Refer to Tech Spec Figure 3.7-1 (Maximum High Linear Power Level and Trip Setpoint Versus MTC) and use MTC value obtained from 1015.016Q to obtain High Linear Power Level Trip Setpoint for 1 MSSV inoperable or 1 MSSV/header inoperable.
change no.
: 2.       IF a component required for MFW isolation becomes inoperable (i.e., a Condensate, MFW, or Heater Drain pump will not trip on MSIS NA or CSAS),
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
THEN restore the component within 48 hours or place it in its MSIS or CSAS actuated state. Otherwise be in Hot Standby in 6 hours.
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 13 OF 13 W.
COMMENTS:
MAIN STEAM AND MAIN FEEDWATER 1.
IF MSSV(s) inoperable, THEN perform the following:
A. Refer to 1015.016Q (MTC vs EFPD AND POWER) to obtain limiting MTC value B. Refer to Tech Spec Figure 3.7-1 (Maximum High Linear Power Level and Trip Setpoint Versus MTC) and use MTC value obtained from 1015.016Q to obtain High Linear Power Level Trip Setpoint for 1 MSSV inoperable or 1 MSSV/header inoperable.
ST 2 2.
IF a component required for MFW isolation becomes inoperable (i.e., a Condensate, MFW, or Heater Drain pump will not trip on MSIS or CSAS),
THEN restore the component within 48 hours or place it in its MSIS or CSAS actuated state.
Otherwise be in Hot Standby in 6 hours.
NA COMMENTS:
1 'B' Service water pump is out of service for repacking.
1 'B' Service water pump is out of service for repacking.
2   2PSV-1054 is inoperable; Maximum High Linear Power level and Trip Setpoint determined to be 87.5%.
2 2PSV-1054 is inoperable; Maximum High Linear Power level and Trip Setpoint determined to be 87.5%.
__________________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
If position manned, then list on shift personnel:
If position manned, then list on shift personnel:
SM                         Sam Manager               CRS       Charlie Supervisor CRSA           NA                                     TRO       NA CBOR             Robert Reactor                       CBOT       Sam Turbine WCO                 William Operator                   AO       Art Jones EOP             Eddie Plant                           SE       Emil Engineer PERFORMED BY:               Sam Turbine REVIEWED BY: ___________________________________________________________________
SM Sam Manager CRS Charlie Supervisor CRSA NA TRO NA CBOR Robert Reactor CBOT Sam Turbine WCO William Operator AO Art Jones EOP Eddie Plant SE Emil Engineer PERFORMED BY: Sam Turbine REVIEWED BY: ___________________________________________________________________
form title:                                                            form no.              change no.
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                            1015.016 B    24-01-0


TUOI: ANO-2-JPM-NRC-MSSVINOP                                                         Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:     2                       REV #:   000                     DATE:
TUOI: ANO-2-JPM-NRC-MSSVINOP Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:
SYSTEM/DUTY AREA:           Conduct of Operations (A.1)
2 REV #:
TASK:       Verify RPS trip setpoint determination for inoperable MSSV JTA#:
000 DATE:
KA VALUE       RO:         3.0       SRO:       3.4       KA  
SYSTEM/DUTY AREA:
Conduct of Operations (A.1)
TASK:
Verify RPS trip setpoint determination for inoperable MSSV JTA#:
KA VALUE RO:
3.0 SRO:
3.4 KA  


==REFERENCE:==
==REFERENCE:==
2.1.3 APPROVED FOR ADMINISTRATION TO:             RO:             SRO:   X TASK LOCATION:             INSIDE CR:               OUTSIDE CR:           BOTH:       X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
2.1.3 APPROVED FOR ADMINISTRATION TO:
PLANT SITE:                         SIMULATOR:           Perform       CLASSROOM:     Perform POSITION EVALUATED:         RO:                     SRO:
RO:
ACTUAL TESTING ENVIRONMENT:           SIMULATOR:             PLANT SITE:       CLASSROOM:
SRO:
TESTING METHOD:         SIMULATE:               PERFORM:
X TASK LOCATION:
APPROXIMATE COMPLETION TIME IN MINUTES:                   15 Minutes REFERENCE(S):       Form 1015.016B, Shift turnover checklist, form 1015.016Q, MTC VS EFPD and power and Unit 2 Tech Specs.
INSIDE CR:
EXAMINEE'S NAME:                                                   SSN:
OUTSIDE CR:
BOTH:
X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform CLASSROOM:
Perform POSITION EVALUATED:
RO:
SRO:
ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
CLASSROOM:
TESTING METHOD:
SIMULATE:
PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
Form 1015.016B, Shift turnover checklist, form 1015.016Q, MTC VS EFPD and power and Unit 2 Tech Specs.
EXAMINEE'S NAME:
SSN:
EVALUATOR'S NAME:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                       UNSATISFACTORY:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
Start Time             Stop Time               Total Time SIGNED:                                               DATE:
Start Time Stop Time Total Time SIGNED:
DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


TUOI: ANO-2-JPM-NRC-MSSVINOP                                                 Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
TUOI: ANO-2-JPM-NRC-MSSVINOP Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
Line 618: Line 933:
TASK PERFORMANCE AIDS: Shift Turnover Checklist, form 1015.016B, Unit 2 Tech Specs, Moderator Temperature Coefficient VS EFPD and Power, form 1015.016Q, and a straight edge.
TASK PERFORMANCE AIDS: Shift Turnover Checklist, form 1015.016B, Unit 2 Tech Specs, Moderator Temperature Coefficient VS EFPD and Power, form 1015.016Q, and a straight edge.


TUOI: ANO-2-JPM-NRC-MSSVINOP                                                                   Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
TUOI: ANO-2-JPM-NRC-MSSVINOP Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
As oncoming CRS, based on initial conditions, verify the shift turnover checklist for correctness.
As oncoming CRS, based on initial conditions, verify the shift turnover checklist for correctness.
CRITICAL ELEMENTS (C)         3, 4 PERFORMANCE CHECKLIST                                 STANDARD                         (Circle One)
CRITICAL ELEMENTS (C) 3, 4 PERFORMANCE CHECKLIST STANDARD (Circle One)
EXAMINER's NOTE: TSI disabled on the MTG has no impact on plant operation or shift turnover checklist. The out of service 'B' service water pump has no Tech Spec implications due to 'A' and 'C' service water pumps being operable.
EXAMINER's NOTE: TSI disabled on the MTG has no impact on plant operation or shift turnover checklist. The out of service 'B' service water pump has no Tech Spec implications due to 'A' and 'C' service water pumps being operable.
N/A SAT UNSAT
: 1. Review Shift turnover checklist for correctness.
: 1. Review Shift turnover                 Examinee reviewed shift checklist for correctness.            turnover checklist.
EXAMINER's CUE:
EXAMINER's CUE:
Inform examinee that an independent review of the values for maximum linear power and trip setpoint derived by CBOT is required.
Inform examinee that an independent review of the values for maximum linear power and trip setpoint derived by CBOT is required.
Examinee reviewed shift turnover checklist.
N/A SAT UNSAT
: 2. Determine that 'B' service water pump inoperability had no Tech Spec implication.
Examinee correctly determined that 'A' and 'C' service water pumps being operable satisfied the Tech Spec requirement for two independent service water loops.
N/A SAT UNSAT (C)
: 3. Using form 1015.016Q, determine MTC for 325 EFPD to be approximately -1.4 X E-4 delta K/K/degree F.
Examinee correctly derived from graph based on 325 EFPD and 80% power curve that MTC is approximately
-1.4 X E-4 delta K/K/degree F.
N/A SAT UNSAT
N/A SAT UNSAT
: 2. Determine that 'B' service            Examinee correctly water pump inoperability had          determined that 'A' and 'C' no Tech Spec implication.              service water pumps being operable satisfied the Tech Spec requirement for two independent service water loops.
N/A SAT UNSAT (C)  3. Using form 1015.016Q,                  Examinee correctly derived determine MTC for 325 EFPD            from graph based on 325 to be approximately -1.4 X E-          EFPD and 80% power curve 4 delta K/K/degree F.                  that MTC is approximately
                                                -1.4 X E-4 delta K/K/degree F.


TUOI: ANO-2-JPM-NRC-MSSVINOP                                                     Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                           STANDARD                     (Circle One)
TUOI: ANO-2-JPM-NRC-MSSVINOP Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)
N/A SAT UNSAT (C) 4. Using Tech Spec 3.7.1 figure       Examinee correctly derived 3.7-1 determines new               from graph based on MTC of -
(C)
maximum power and RPS              1.4XE-4 delta K/K/degree F linear power trip setpoint to be  and knowing that one MSSV is 87.5% +/- 1%.                        inoperable determined that maximum power and RPS linear power trip setpoint should be 87.5% +/- 1%.
: 4. Using Tech Spec 3.7.1 figure 3.7-1 determines new maximum power and RPS linear power trip setpoint to be 87.5% +/- 1%.
Examinee correctly derived from graph based on MTC of -
1.4XE-4 delta K/K/degree F and knowing that one MSSV is inoperable determined that maximum power and RPS linear power trip setpoint should be 87.5% +/- 1%.
OR Examinee correctly interpolated from points given on the graph that maximum power and RPS linear power trip setpoint should be 87.5% +/-
OR Examinee correctly interpolated from points given on the graph that maximum power and RPS linear power trip setpoint should be 87.5% +/-
1%.
1%.
N/A SAT UNSAT
N/A SAT UNSAT
: 5. Determine that the CBOT           Examinee determined the calculation for maximum           maximum power and RPS power and RPS linear power        linear power trip setpoint trip setpoint is correct and       calculated by CBOT to be sign 1015.016B reviewed by         correct and signed 1015.016B blank.                            reviewed by blank.
: 5. Determine that the CBOT calculation for maximum power and RPS linear power trip setpoint is correct and sign 1015.016B reviewed by blank.
EXAMINER's NOTE: Examinee may discuss the Tech Spec applicability at this point stating that Tech Spec 3.7.1.1 LCO to allows power operations to continue provided that within 4 hours power is reduced to the maximum power of 79% or as allowed by figure 3.7-1 and within 12 hours, the RPS trip setpoint adjusted to be less than the value of 79% or as allowed in figure 3.7-1 per table 3.7-1, but this discussion is not required for successful completion of the JPM.
Examinee determined the maximum power and RPS linear power trip setpoint calculated by CBOT to be correct and signed 1015.016B reviewed by blank.
N/A SAT UNSAT EXAMINER's NOTE: Examinee may discuss the Tech Spec applicability at this point stating that Tech Spec 3.7.1.1 LCO to allows power operations to continue provided that within 4 hours power is reduced to the maximum power of 79% or as allowed by figure 3.7-1 and within 12 hours, the RPS trip setpoint adjusted to be less than the value of 79% or as allowed in figure 3.7-1 per table 3.7-1, but this discussion is not required for successful completion of the JPM.
END
END


TUOI: ANO-2-JPM-NRC-MSSVINOP                                                   Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
TUOI: ANO-2-JPM-NRC-MSSVINOP Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
* The plant is at 80% power, 325 EFPD, Steady State.
* The plant is at 80% power, 325 EFPD, Steady State.
* Plant refueling outage is expected to start in 36 hours.
* Plant refueling outage is expected to start in 36 hours.
Line 653: Line 975:
As oncoming CRS, based on initial conditions, verify the shift turnover checklist for correctness.
As oncoming CRS, based on initial conditions, verify the shift turnover checklist for correctness.


TUOI: ANO-2-JPM-NRC-MSSVINOP                                                   Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
TUOI: ANO-2-JPM-NRC-MSSVINOP Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
* The plant is at 80% power, 325 EFPD, Steady State.
* The plant is at 80% power, 325 EFPD, Steady State.
* Plant refueling outage is expected to start in 36 hours.
* Plant refueling outage is expected to start in 36 hours.
Line 665: Line 987:
As oncoming CRS, based on initial conditions, verify the shift turnover checklist for correctness.
As oncoming CRS, based on initial conditions, verify the shift turnover checklist for correctness.


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 1 OF 13 INSTRUCTIONS:
form title:
1.0       CIRCLE YES, NO OR N/A FOR EACH ITEM IN ANY DESIRED ORDER.
form no.
2.0         N/A ITEMS NOT APPLICABLE DUE TO MODE OR BEING ALIGNED TO OTHER TRAIN.
change no.
3.0         IF NO IS CIRCLED, THEN EXPLAIN IN THE REMARKS SECTION.
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
4.0         IF NO IS CIRCLED ON A TECH SPEC (TS) REQUIRED COMPONENT, THEN REFER TO ASSOCIATED TECH SPEC ACTION STATEMENT AND NOTIFY OPPOSITE UNIT, AS APPLICABLE.
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 1 OF 13 INSTRUCTIONS:
Mode:       1                   Date:         current               Time:           current A.           SDBCS ALIGNMENT (2C02)
1.0 CIRCLE YES, NO OR N/A FOR EACH ITEM IN ANY DESIRED ORDER.
: 1.       2CV-1002 (A S/G Upstream ADV Isol) closed                                                           YES     NO
2.0 N/A ITEMS NOT APPLICABLE DUE TO MODE OR BEING ALIGNED TO OTHER TRAIN.
: 2.       2CV-1052 (B S/G Upstream ADV Isol) closed                                                           YES     NO
3.0 IF NO IS CIRCLED, THEN EXPLAIN IN THE REMARKS SECTION.
: 3.       2CV-1001 (Upstream ADV) closed, HIC in Manual, permissive in Off                                   YES     NO
4.0 IF NO IS CIRCLED ON A TECH SPEC (TS) REQUIRED COMPONENT, THEN REFER TO ASSOCIATED TECH SPEC ACTION STATEMENT AND NOTIFY OPPOSITE UNIT, AS APPLICABLE.
: 4.       2CV-1051 (Upstream ADV) closed, HIC in Manual, permissive in Off                                   YES     NO
Mode:
: 5.       2CV-0301 (DDV) closed, HIC in Auto and permissive HS in Auto                                       YES     NO
1 Date:
: 6.       2CV-0305 (DDV) closed, HIC in Auto and permissive HS in Auto                                       YES     NO
current Time:
: 7.       2CV-0302 (Bypass Vlv) closed, HIC in Auto, permissive HS in Auto                                   YES     NO
current A.
: 8.       2CV-0303 (Bypass Vlv) closed, HIC in Auto, permissive HS in Auto                                   YES     NO
SDBCS ALIGNMENT (2C02) 1.
: 9.       2CV-0306 (Bypass Vlv) closed, HIC in Auto, permissive HS in Auto                                   YES     NO B.           SHUTDOWN COOLING (2C04)
2CV-1002 (A S/G Upstream ADV Isol) closed YES NO 2.
Two independent ECCS subsytems required operable in Mode 1, 2 & 3 with PZR pressure 1700 psia.
2CV-1052 (B S/G Upstream ADV Isol) closed YES NO 3.
(TS 3.5.2)
2CV-1001 (Upstream ADV) closed, HIC in Manual, permissive in Off YES NO 4.
: 1.       2CV-5091 (LPSI Disch Header) open.                                                                 YES NO N/A
2CV-1051 (Upstream ADV) closed, HIC in Manual, permissive in Off YES NO 5.
: 2.       2HS-5091 in ESF with the key removed.                                                               YES NO N/A
2CV-0301 (DDV) closed, HIC in Auto and permissive HS in Auto YES NO 6.
: 3.       2FIC-5091 (LPSI Disch Hdr Flow) in Auto & set at ~ 2400 gpm.                                       YES NO N/A form title:                                                                        form no.                change no.
2CV-0305 (DDV) closed, HIC in Auto and permissive HS in Auto YES NO 7.
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                                        1015.016  B  24-01-0
2CV-0302 (Bypass Vlv) closed, HIC in Auto, permissive HS in Auto YES NO 8.
2CV-0303 (Bypass Vlv) closed, HIC in Auto, permissive HS in Auto YES NO 9.
2CV-0306 (Bypass Vlv) closed, HIC in Auto, permissive HS in Auto YES NO B.
SHUTDOWN COOLING (2C04)
Two independent ECCS subsytems required operable in Mode 1, 2 & 3 with PZR pressure 1700 psia.
(TS 3.5.2) 1.
2CV-5091 (LPSI Disch Header) open.
YES NO N/A 2.
2HS-5091 in ESF with the key removed.
YES NO N/A 3.
2FIC-5091 (LPSI Disch Hdr Flow) in Auto & set at ~ 2400 gpm.
YES NO N/A


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 2 OF 13 C.         BORATION WATER SOURCES Each of the following borated water sources shall be operable: BAMT(s)
form title:
IAW 2104.003 Supplement 4 Figure 1 (TRM 3.1.2.8) and RWT. (TRM 3.1.2.8)
form no.
: 1.       BAM Tanks 2T-6A and/or 2T-6B in the acceptable region of                           YES    NO 2104.003 Supplement 4 Figure 1
change no.
: 2.       Boric Acid Tank (2T-6A) Temperature > 55&deg;F                                         YES     NO
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
: 3.       Boric Acid Tank (2T-6B) Temperature > 55&deg;F                                         YES     NO
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 2 OF 13 C.
: 4.       RWT Level 92% to 99%                                                               YES     NO
BORATION WATER SOURCES Each of the following borated water sources shall be operable: BAMT(s)
: 5.       RWT Boron Concentration 2500 to 3000 ppm                                           YES     NO
IAW 2104.003 Supplement 4 Figure 1 (TRM 3.1.2.8) and RWT. (TRM 3.1.2.8) 1.
: 6.       RWT Temperature 47 to 110&deg;F (CR-2-00-687)                                         YES     NO Are required operable boron water sources available?                               YES     NO form title:                                                        form no.              change no.
BAM Tanks 2T-6A and/or 2T-6B in the acceptable region of 2104.003 Supplement 4 Figure 1 YES NO 2.
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                        1015.016 B  24-01-0
Boric Acid Tank (2T-6A) Temperature > 55&deg;F YES NO 3.
Boric Acid Tank (2T-6B) Temperature > 55&deg;F YES NO 4.
RWT Level 92% to 99%
YES NO 5.
RWT Boron Concentration 2500 to 3000 ppm YES NO 6.
RWT Temperature 47 to 110&deg;F (CR-2-00-687)
YES NO Are required operable boron water sources available?
YES NO


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 3 OF 13 D.         BORATION FLOW PATHS AND COMPONENTS (2C09 AND 2C33)
form title:
form no.
change no.
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 3 OF 13 D.
BORATION FLOW PATHS AND COMPONENTS (2C09 AND 2C33)
At least two charging pumps required operable. (TRM 3.1.2.4)
At least two charging pumps required operable. (TRM 3.1.2.4)
At least one charging pump in the Boron Injection Flow Path required operable. (TRM 3.1.2.2)
At least one charging pump in the Boron Injection Flow Path required operable. (TRM 3.1.2.2) 1.
: 1.       2P-36A, associated room cooler, and room cooler SW valve operable.                                         YES     NO
2P-36A, associated room cooler, and room cooler SW valve operable.
: 2.       2P-36B, associated room cooler, and room cooler SW valve operable.                                         YES     NO
YES NO 2.
: 3.       2P-36C, associated room cooler and room cooler SW valve operable all powered from the same train           YES    NO (RED or GREEN).
2P-36B, associated room cooler, and room cooler SW valve operable.
: 4.       Boric Acid Pump (2P-39A) operable.                                                                         YES     NO
YES NO 3.
: 5.       Boric Acid Pump (2P-39B) operable.                                                                         YES     NO
2P-36C, associated room cooler and room cooler SW valve operable all powered from the same train (RED or GREEN).
: 6.       2CV-4916-2 (Emergency Borate) operable                                                                     YES     NO
YES NO 4.
: 7.       2CV-4920-1 (Gravity Feed) operable.                                                                       YES     NO
Boric Acid Pump (2P-39A) operable.
: 8.       2CV-4921-1 (Gravity Feed) operable.                                                                       YES     NO
YES NO 5.
: 9.       2CV-4950-2 (RWT to CCP suction) operable.                                                                 YES     NO
Boric Acid Pump (2P-39B) operable.
: 10.       2CV-4873-1 (VCT Outlet ) operable                                                                         YES     NO Circle Paths/component(s) for which credit taken (TRM 3.1.2.2)
YES NO 6.
2CV-4916-2 (Emergency Borate) operable YES NO 7.
2CV-4920-1 (Gravity Feed) operable.
YES NO 8.
2CV-4921-1 (Gravity Feed) operable.
YES NO 9.
2CV-4950-2 (RWT to CCP suction) operable.
YES NO 10.
2CV-4873-1 (VCT Outlet ) operable YES NO Circle Paths/component(s) for which credit taken (TRM 3.1.2.2)
ONE BAMT meets Volume Requirements - 2 of 3 paths required:
ONE BAMT meets Volume Requirements - 2 of 3 paths required:
* One flow path from the appropriate BAM tank via a BAM pump and a Charging pump.
* One flow path from the appropriate BAM tank via a BAM pump and a Charging pump.
Line 719: Line 1,072:
* One flow path from BAM tank A via Gravity Feed connection and Charging pump.
* One flow path from BAM tank A via Gravity Feed connection and Charging pump.
* One flow path from BAM tank B via Gravity Feed connection and Charging pump.
* One flow path from BAM tank B via Gravity Feed connection and Charging pump.
* One flow path from the RWT tank via a Charging pump.
One flow path from the RWT tank via a Charging pump.
Are required boron injection flow paths operable for the operable boron water source? (TRM 3.1.2.2)       YES     NO Are at least two charging pumps operable, one on each train?                                               YES    NO (TRM 3.1.2.4) form title:                                                                                form no.              change no.
Are required boron injection flow paths operable for the operable boron water source? (TRM 3.1.2.2)
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                                                1015.016  B  24-01-0
YES NO Are at least two charging pumps operable, one on each train?
(TRM 3.1.2.4)
YES NO


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 4 OF 13 E.       EMERGENCY DIESEL GENERATORS (2C33)
form title:
Two Diesel Generators are required operable. (TS 3.8.1.1)
form no.
: 1.       2DG1 Trouble/Not Available alarms clear                                                           YES     NO
change no.
: 2.       2HS-2809-1 (Engine Start) in Normal After Stop                                                     YES     NO
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
: 3.       2DG2 Trouble/Not Available alarms clear                                                           YES     NO
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 4 OF 13 E.
: 4.       2HS-2829-2 (Engine Start) in Normal After Stop                                                     YES     NO Are both EDGs operable?                                                                           YES     NO F.         AC ELECTRICAL SYSTEMS (2C10, 2C33 AND SPDS)
EMERGENCY DIESEL GENERATORS (2C33)
Two independent circuits between offsite transmission network and onsite ESF buses shall be operable. (TS 3.8.1.1)
Two Diesel Generators are required operable. (TS 3.8.1.1) 1.
2DG1 Trouble/Not Available alarms clear YES NO 2.
2HS-2809-1 (Engine Start) in Normal After Stop YES NO 3.
2DG2 Trouble/Not Available alarms clear YES NO 4.
2HS-2829-2 (Engine Start) in Normal After Stop YES NO Are both EDGs operable?
YES NO F.
AC ELECTRICAL SYSTEMS (2C10, 2C33 AND SPDS)
Two independent circuits between offsite transmission network and onsite ESF buses shall be operable.
(TS 3.8.1.1)
SU2 HS may be in PTL with breaker available.
SU2 HS may be in PTL with breaker available.
: 1.                                         Circle Operable Circuits RED                             GREEN SU2         SU3                   SU2     SU3 2A1         2A1                   2A2     2A2 2A3         2A3                   2A4     2A4 Are two physically independent circuits between the offsite                                       YES      NO transmission network and onsite ESF buses operable?
1.
Both trains of ESF Electrical buses shall be operable & energized with tie breakers open between redundant buses. (TS 3.8.2.1) 2RS1, 2, 3 & 4 are required to be operable. (TS 3.8.2.1)
Circle Operable Circuits RED GREEN SU2 SU3 SU2 SU3 2A1 2A1 2A2 2A2 2A3 2A3 2A4 2A4 Are two physically independent circuits between the offsite transmission network and onsite ESF buses operable?
: 2.                                         Circle Operable Circuits RED                                               GREEN 2A3                                                 2A4 2B5                                                 2B6 2B51                                                 2B61 2B52                                                 2B62 2B53                                                 2B63 2B54                                                 2B64 2RS1 ~ 120V on SPDS (Note)                             2RS2 ~ 120V on SPDS (Note) 2RS3 ~ 120V on SPDS (Note)                             2RS4 ~ 120V on SPDS (Note) 2RS1 inverter trouble                               2RS2 inverter trouble alarm clear                                           alarm clear 2RS3 inverter trouble                               2RS4 inverter trouble alarm clear                                           alarm clear 2A-310 IN PTL                                           2A-410 IN PTL 2B-513 IN PTL                                           2B-613 IN PTL Are both ESF electrical trains operable and energized with tie                                   YES        NO breakers open between redundant buses?
YES NO Both trains of ESF Electrical buses shall be operable & energized with tie breakers open between redundant buses.
Note: If a swing inverter is in service, then verify RS Panel voltage
(TS 3.8.2.1) 2RS1, 2, 3 & 4 are required to be operable.
    ~ 120V on SPDS using computer point E2RS1RS3 or E2RS2RS4.
(TS 3.8.2.1) 2.
form title:                                                                          form no.              change no.
Circle Operable Circuits RED GREEN 2A3 2A4 2B5 2B6 2B51 2B61 2B52 2B62 2B53 2B63 2B54 2B64 2RS1 ~ 120V on SPDS (Note) 2RS2 ~ 120V on SPDS (Note) 2RS3 ~ 120V on SPDS (Note) 2RS4 ~ 120V on SPDS (Note) 2RS1 inverter trouble 2RS2 inverter trouble alarm clear alarm clear 2RS3 inverter trouble 2RS4 inverter trouble alarm clear alarm clear 2A-310 IN PTL 2A-410 IN PTL 2B-513 IN PTL 2B-613 IN PTL Are both ESF electrical trains operable and energized with tie breakers open between redundant buses?
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                                          1015.016 B  24-01-0
YES NO Note: If a swing inverter is in service, then verify RS Panel voltage
~ 120V on SPDS using computer point E2RS1RS3 or E2RS2RS4.


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 5 OF 13 G.           DC ELECTRICAL SYSTEMS (2C10, 2C33 AND SPDS)
form title:
form no.
change no.
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 5 OF 13 G.
DC ELECTRICAL SYSTEMS (2C10, 2C33 AND SPDS)
Both trains of DC electrical sources shall be operable with each train consisting of a 125 VDC bus, a battery bank & a full capacity charger. (TS 3.8.2.3)
Both trains of DC electrical sources shall be operable with each train consisting of a 125 VDC bus, a battery bank & a full capacity charger. (TS 3.8.2.3)
DC Buses are verified operable by checking corresponding Undervoltage, Not Available, and Trouble alarms clear and bus voltage normal (~130V) on SPDS.
DC Buses are verified operable by checking corresponding Undervoltage, Not Available, and Trouble alarms clear and bus voltage normal (~130V) on SPDS.
Circle Operable Trains RED                       GREEN 2DO1                       2D02 2D11                       2D12 2D31A OR 2D31B             2D32A OR 2D32B Are both trains of DC electrical sources operable?                                                         YES     NO H.         CONTROL ROOM EMERGENCY AIR CONDITIONING AND VENTILATION SYSTEMS (2C33, C19 AND LOCAL)
Circle Operable Trains RED GREEN 2DO1 2D02 2D11 2D12 2D31A OR 2D31B 2D32A OR 2D32B Are both trains of DC electrical sources operable?
YES NO H.
CONTROL ROOM EMERGENCY AIR CONDITIONING AND VENTILATION SYSTEMS (2C33, C19 AND LOCAL)
Two independent Control Room Emergency Air Conditioning and Air Filtration Systems are required operable.
Two independent Control Room Emergency Air Conditioning and Air Filtration Systems are required operable.
(Unit 2 TS 3.3.3.1, Table 3.3-6, 3.7.6.1 and TRM 3.3.3.7 and Unit 1 TS 3.5.1.13, Table 3.5.1-1, 3.9.1, 3.9.2 and TRM 3.5.1)
(Unit 2 TS 3.3.3.1, Table 3.3-6, 3.7.6.1 and TRM 3.3.3.7 and Unit 1 TS 3.5.1.13, Table 3.5.1-1, 3.9.1, 3.9.2 and TRM 3.5.1) 1.
: 1.       2VSF-9 operable and handswitch in AUTO.                                                                     YES     NO
2VSF-9 operable and handswitch in AUTO.
: 2.       2VE-1A and 2VUC-27A operable.                                                                               YES     NO
YES NO 2.
: 3.       2VE-1B and 2VUC-27B operable.                                                                               YES     NO
2VE-1A and 2VUC-27A operable.
: 4.       At least one Control Room Rad Monitor (2RITS-8750-1A or                                                     YES      NO 2RITS-8750-1B) operable and indicating between minimum and maximum values from OPS B-28 and OPS B-43. (TS 3.3.3.1)
YES NO 3.
: 5.       Both 2DG1 and 2DG2 operable                                                                                 YES     NO
2VE-1B and 2VUC-27B operable.
: 6.       ESF Buses separated (NOT cross-tied)                                                                       YES     NO
YES NO 4.
: 7.       Chlorine Monitors operable (Unit 2 TRM 3.3.3.7, Unit 1 TRM 3.5.1)                                           YES     NO
At least one Control Room Rad Monitor (2RITS-8750-1A or 2RITS-8750-1B) operable and indicating between minimum and maximum values from OPS B-28 and OPS B-43.
: 8.       VSF-9 operable and handswitch in Auto.                                                                     YES     NO
(TS 3.3.3.1)
: 9.       VSF-9 aligned to operable EDG power source.                                                                 YES     NO
YES NO 5.
: 10.       At least one Unit One CR Rad Monitor operable.                                                             YES      NO (2RITS-8001A or 2RITS-8001B)
Both 2DG1 and 2DG2 operable YES NO 6.
Are required CR Emergency Air Conditioning and Filtration                                                   YES      NO Systems operable?
ESF Buses separated (NOT cross-tied)
If NO is circled, then notify Unit 1 of equipment status and refer to Tech Specs.
YES NO 7.
: 11.       Control Room Emergency AC units (2VUC-27A & 2VUC-27B) drain loop seals (2SG-8600A and 2SG-8600B) indicate > 1.5 H2O above bottom of                                         YES      NO sightglass?
Chlorine Monitors operable (Unit 2 TRM 3.3.3.7, Unit 1 TRM 3.5.1)
* Add water at 1.5 H2O
YES NO 8.
* Initiate Condition Report at 1 H2O
VSF-9 operable and handswitch in Auto.
YES NO 9.
VSF-9 aligned to operable EDG power source.
YES NO 10.
At least one Unit One CR Rad Monitor operable.
(2RITS-8001A or 2RITS-8001B)
YES NO Are required CR Emergency Air Conditioning and Filtration Systems operable?
YES NO If NO is circled, then notify Unit 1 of equipment status and refer to Tech Specs.
11.
Control Room Emergency AC units (2VUC-27A & 2VUC-27B) drain loop seals (2SG-8600A and 2SG-8600B) indicate > 1.5 H2O above bottom of sightglass?
Add water at 1.5 H2O Initiate Condition Report at 1 H2O
[ER002956E202, CR-ANO-C-2001-0175]
[ER002956E202, CR-ANO-C-2001-0175]
form title:                                                                                  form no.              change no.
YES NO
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                                                  1015.016  B  24-01-0


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 6 OF 13 I.         EMERGENCY FEEDWATER Two EFW pumps and associated flow paths are required operable in Mode 1, 2 & 3. (TS 3.7.1.2) All valves except 2CV-0707 and 2CV-1532-1 must be energized. 2CV-0711-2 (2P-7A Suction from SW)/2CV-0716-1 (2P-7B Suction from SW) checked OPEN or OPERABLE is required for surveillance action if SW is supply to EFW (TS 4.7.1.3.2) 2C33
form title:
: 1.       2CV-0707 - Heaters removed, valve open. Check open by either remote or local position indication.     YES NO N/A
form no.
: 2.       2EFW-0706 (SU/BD Demin Effluent to EFW) closed when > 10%.                                             YES NO N/A 2C17
change no.
: 3.       2CV-1000-1 (Main Steam to EFWP Turbine 2K-3) open.                                                     YES NO N/A
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
: 4.       2CV-1038-2 (2P-7B Discharge to S/G A) open.                                                           YES NO N/A
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 6 OF 13 I.
: 5.       2CV-1036-2 (2P-7B Discharge to S/G B) open.                                                           YES NO N/A
EMERGENCY FEEDWATER Two EFW pumps and associated flow paths are required operable in Mode 1, 2 & 3. (TS 3.7.1.2) All valves except 2CV-0707 and 2CV-1532-1 must be energized. 2CV-0711-2 (2P-7A Suction from SW)/2CV-0716-1 (2P-7B Suction from SW) checked OPEN or OPERABLE is required for surveillance action if SW is supply to EFW (TS 4.7.1.3.2) 2C33 1.
: 6.       2CV-1025-1 (2P-7B Flow Control to S/G A) closed.                                                       YES NO N/A
2CV-0707 - Heaters removed, valve open. Check open by either remote or local position indication.
: 7.       2CV-1075-1 (2P-7B Flow Control to S/G B) closed.                                                       YES NO N/A
YES NO N/A 2.
: 8.       2CV-0716-1 (2P-7B Suction From SW) closed.                                                             YES NO N/A
2EFW-0706 (SU/BD Demin Effluent to EFW) closed when > 10%.
: 9.       2CV-0789-1 (2P-7B Suction From CST) open.                                                             YES NO N/A
YES NO N/A 2C17 3.
: 10.       EFW Pump 2P-7B operable.                                                                               YES NO N/A
2CV-1000-1 (Main Steam to EFWP Turbine 2K-3) open.
: 11.       EFW Pump 2P-7B Room Cooler 2VUC-6B operable. (CR-ANO-2-2000-0109)                                     YES NO N/A
YES NO N/A 4.
: 12.       EFW Pump 2P-7B Room Cooler 2VUC-6B SW MOV 2CV-1532-1 operable OR                                       YES NO N/A de-energized open. (CR-ANO-2-2000-0109) 2C16
2CV-1038-2 (2P-7B Discharge to S/G A) open.
: 13.       2CV-1050-2 (Main Steam to EFWP Turbine 2K-3) open.                                                     YES NO N/A
YES NO N/A 5.
: 14.       2CV-1026-2 (2P-7A Discharge to S/G A) closed.                                                         YES NO N/A
2CV-1036-2 (2P-7B Discharge to S/G B) open.
: 15.       2CV-1076-2 (2P-7A Discharge to S/G B) closed.                                                         YES NO N/A
YES NO N/A 6.
: 16.       2CV-1037-1 (2P-7A Discharge to S/G A) open.                                                           YES NO N/A
2CV-1025-1 (2P-7B Flow Control to S/G A) closed.
: 17.       2CV-1039-1 (2P-7A Discharge to S/G B) open.                                                           YES NO N/A
YES NO N/A 7.
: 18.       2CV-0340-2 (Steam to EFWP Turbine 2K-3) closed.                                                       YES NO N/A
2CV-1075-1 (2P-7B Flow Control to S/G B) closed.
: 19.       2CV-0711-2 (2P-7A Suction from SW) closed.                                                             YES NO N/A
YES NO N/A 8.
: 20.       2CV-0795-2 (2P-7A Suction from CST) open.                                                             YES NO N/A Are required EFW pumps and associated flow paths operable?                                             YES NO N/A form title:                                                                            form no.                change no.
2CV-0716-1 (2P-7B Suction From SW) closed.
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                                            1015.016    B  24-01-0
YES NO N/A 9.
2CV-0789-1 (2P-7B Suction From CST) open.
YES NO N/A 10.
EFW Pump 2P-7B operable.
YES NO N/A 11.
EFW Pump 2P-7B Room Cooler 2VUC-6B operable. (CR-ANO-2-2000-0109)
YES NO N/A 12.
EFW Pump 2P-7B Room Cooler 2VUC-6B SW MOV 2CV-1532-1 operable OR de-energized open. (CR-ANO-2-2000-0109)
YES NO N/A 2C16 13.
2CV-1050-2 (Main Steam to EFWP Turbine 2K-3) open.
YES NO N/A 14.
2CV-1026-2 (2P-7A Discharge to S/G A) closed.
YES NO N/A 15.
2CV-1076-2 (2P-7A Discharge to S/G B) closed.
YES NO N/A 16.
2CV-1037-1 (2P-7A Discharge to S/G A) open.
YES NO N/A 17.
2CV-1039-1 (2P-7A Discharge to S/G B) open.
YES NO N/A 18.
2CV-0340-2 (Steam to EFWP Turbine 2K-3) closed.
YES NO N/A 19.
2CV-0711-2 (2P-7A Suction from SW) closed.
YES NO N/A 20.
2CV-0795-2 (2P-7A Suction from CST) open.
YES NO N/A Are required EFW pumps and associated flow paths operable?
YES NO N/A


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 7 OF 13 J.         CONTAINMENT PENETRATION ROOM EXHAUST VENTILATION Maintain either 2VEF-38A or 2VEF-38B in PTL to prevent both fans from auto starting on CIAS (CR-2-93-0061).
form title:
Circle Fan Status 2VEF-38A:                       AUTO           PTL 2VEF-38B:                       AUTO           PTL
form no.
: 1.       Is ONE Penetration Room Exhaust Fan in AUTO and ONE in PTL?                           YES     NO K.           CONTAINMENT COOLING SYSTEM Two independent Containment Cooling groups are required operable (TS 3.6.2.3), both fans in a group are required for that group to be operable. Valves must be energized.
change no.
2C17
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
: 1.       CNTMT Cooling Fan 2VSF-1B operable.                                                   YES     NO
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 7 OF 13 J.
: 2.       2CV-1519-1 (2VSF-1A/1B SW Outlet) closed.                                             YES     NO
CONTAINMENT PENETRATION ROOM EXHAUST VENTILATION Maintain either 2VEF-38A or 2VEF-38B in PTL to prevent both fans from auto starting on CIAS (CR-2-93-0061).
: 3.       2CV-1511-1 (2VSF-1A/B SW Inlet) closed.                                               YES     NO
Circle Fan Status 2VEF-38A:
: 4.       2SV-1511-1 (SW Bypass for 2CV-1511-1) open.                                           YES     NO
AUTO PTL 2VEF-38B:
: 5.       CNTMT Cooling Fan 2VSF-1A operable.                                                   YES     NO 2C16
AUTO PTL 1.
: 6.       CNTMT Cooling Fan 2VSF-1D operable.                                                   YES     NO
Is ONE Penetration Room Exhaust Fan in AUTO and ONE in PTL?
: 7.       2CV-1513-2 (2VSF-1C/D SW Outlet) closed.                                             YES     NO
YES NO K.
: 8.       2CV-1510-2 (2VSF-1C/D SW Inlet) closed.                                               YES     NO
CONTAINMENT COOLING SYSTEM Two independent Containment Cooling groups are required operable (TS 3.6.2.3), both fans in a group are required for that group to be operable.
: 9.       2SV-1510-2 (SW Bypass for 2CV-1510-2) open.                                           YES     NO
Valves must be energized.
: 10.       CNTMT Cooling Fan 2VSF-1C operable.                                                   YES     NO Are required Containment Cooling groups operable?                                     YES     NO form title:                                                            form no.              change no.
2C17 1.
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                            1015.016 B  24-01-0
CNTMT Cooling Fan 2VSF-1B operable.
YES NO 2.
2CV-1519-1 (2VSF-1A/1B SW Outlet) closed.
YES NO 3.
2CV-1511-1 (2VSF-1A/B SW Inlet) closed.
YES NO 4.
2SV-1511-1 (SW Bypass for 2CV-1511-1) open.
YES NO 5.
CNTMT Cooling Fan 2VSF-1A operable.
YES NO 2C16 6.
CNTMT Cooling Fan 2VSF-1D operable.
YES NO 7.
2CV-1513-2 (2VSF-1C/D SW Outlet) closed.
YES NO 8.
2CV-1510-2 (2VSF-1C/D SW Inlet) closed.
YES NO 9.
2SV-1510-2 (SW Bypass for 2CV-1510-2) open.
YES NO 10.
CNTMT Cooling Fan 2VSF-1C operable.
YES NO Are required Containment Cooling groups operable?
YES NO


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 8 OF 13 L.         SAFETY INJECTION TANKS SIT isolation valves are required to be open in Mode 1, 2 & 3 with PZR pressure 700 psia (TS 4.5.1.a.2) 2C17
form title:
: 1.       2CV-5003-1 (SIT 2T-2A Outlet) locked open, key removed.                                           YES NO N/A
form no.
: 2.       2CV-5023-1 (SIT 2T-2B Outlet) locked open, key removed.                                           YES NO N/A 2C16
change no.
: 3.       2CV-5043-2 (SIT 2T-2C Outlet) locked open, key removed.                                           YES NO N/A
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
: 4.       2CV-5063-2 (SIT 2T-2D Outlet) locked open, key removed.                                           YES NO N/A Are all required SIT outlet valves open?                                                           YES NO N/A M.         LOW PRESSURE SAFETY INJECTION Two independent ECCS subsystems are required in Mode 1, 2 & 3 with PZR pressure 1700 psia (TS 3.5.2) Valves Must Be Energized 2C17
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 8 OF 13 L.
: 1.       2CV-5017-1 (LPSI to 2P-32A Loop) closed.                                                           YES NO N/A
SAFETY INJECTION TANKS SIT isolation valves are required to be open in Mode 1, 2 & 3 with PZR pressure 700 psia (TS 4.5.1.a.2) 2C17 1.
: 2.       LPSI Pump 2P-60A operable.                                                                         YES NO N/A
2CV-5003-1 (SIT 2T-2A Outlet) locked open, key removed.
: 3.       2CV-5037-1 (LPSI to 2P-32B Loop) closed.                                                           YES NO N/A 2C16
YES NO N/A 2.
: 4.       2CV-5057-2 (LPSI to 2P-32C Loop) closed.                                                           YES NO N/A
2CV-5023-1 (SIT 2T-2B Outlet) locked open, key removed.
: 5.       LPSI Pump 2P-60B operable.                                                                         YES NO N/A
YES NO N/A 2C16 3.
: 6.       2CV-5077-2 (LPSI to 2P-32D Loop) closed.                                                           YES NO N/A Are required ECCS subsystems (LPSI) operable?                                                     YES NO N/A form title:                                                                          form no.              change no.
2CV-5043-2 (SIT 2T-2C Outlet) locked open, key removed.
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                                          1015.016  B  24-01-0
YES NO N/A 4.
2CV-5063-2 (SIT 2T-2D Outlet) locked open, key removed.
YES NO N/A Are all required SIT outlet valves open?
YES NO N/A M.
LOW PRESSURE SAFETY INJECTION Two independent ECCS subsystems are required in Mode 1, 2 & 3 with PZR pressure 1700 psia (TS 3.5.2) Valves Must Be Energized 2C17 1.
2CV-5017-1 (LPSI to 2P-32A Loop) closed.
YES NO N/A 2.
LPSI Pump 2P-60A operable.
YES NO N/A 3.
2CV-5037-1 (LPSI to 2P-32B Loop) closed.
YES NO N/A 2C16 4.
2CV-5057-2 (LPSI to 2P-32C Loop) closed.
YES NO N/A 5.
LPSI Pump 2P-60B operable.
YES NO N/A 6.
2CV-5077-2 (LPSI to 2P-32D Loop) closed.
YES NO N/A Are required ECCS subsystems (LPSI) operable?
YES NO N/A


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 9 OF 13 N.         HIGH PRESSURE SAFETY INJECTION Two independent ECCS subsystems are required in Modes 1, 2 & 3 with PZR pressure 1700 psia (TS 3.5.2). One ECCS subsystem is required in Modes 3 & 4 with PZR pressure < 1700 psia (TS 3.5.3).
form title:
form no.
change no.
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 9 OF 13 N.
HIGH PRESSURE SAFETY INJECTION Two independent ECCS subsystems are required in Modes 1, 2 & 3 with PZR pressure 1700 psia (TS 3.5.2). One ECCS subsystem is required in Modes 3 & 4 with PZR pressure < 1700 psia (TS 3.5.3).
Valves must be energized except 2CV-5101-1 and 2CV-5102-2.
Valves must be energized except 2CV-5101-1 and 2CV-5102-2.
2C17
2C17 1.
: 1.       2CV-5630-1 (RWT 2T-3 Outlet) open                                                                         YES NO N/A
2CV-5630-1 (RWT 2T-3 Outlet) open YES NO N/A 2.
: 2.       2CV-5101-1 (HPSI HDR #1 Hot Leg Injection) closed                                                         YES NO N/A
2CV-5101-1 (HPSI HDR #1 Hot Leg Injection) closed YES NO N/A 3.
: 3.       2CV-5015-1 (HPSI HDR #1 to 2P-32A Loop) closed                                                           YES NO N/A
2CV-5015-1 (HPSI HDR #1 to 2P-32A Loop) closed YES NO N/A 4.
: 4.       2CV-5035-1 (HPSI HDR #1 to 2P-32B Loop) closed                                                           YES NO N/A
2CV-5035-1 (HPSI HDR #1 to 2P-32B Loop) closed YES NO N/A 5.
: 5.       2CV-5055-1 (HPSI HDR #1 to 2P-32C Loop) closed                                                           YES NO N/A
2CV-5055-1 (HPSI HDR #1 to 2P-32C Loop) closed YES NO N/A 6.
: 6.       2CV-5075-1 (HPSI HDR #1 to 2P-32D Loop) closed                                                           YES NO N/A
2CV-5075-1 (HPSI HDR #1 to 2P-32D Loop) closed YES NO N/A 7.
: 7.       2P-89C operable if aligned to A header (If not required for auto start, then HS in PTL.)                 YES NO N/A
2P-89C operable if aligned to A header (If not required for auto start, then HS in PTL.)
: 8.       2P-89A operable (If not required for auto start, then HS in PTL.)                                         YES NO N/A
YES NO N/A 8.
: 9.       2CV-5647-1 (CNTMT Sump Suction Isol) locked open, key removed)                                           YES NO N/A
2P-89A operable (If not required for auto start, then HS in PTL.)
: 10.       2CV-5649-1 (CNTMT Sump Suction Isol) closed                                                               YES NO N/A 2C16
YES NO N/A 9.
: 11.       2CV-5631-2 (RWT 2T-3 outlet) open                                                                         YES NO N/A
2CV-5647-1 (CNTMT Sump Suction Isol) locked open, key removed)
: 12.       2CV-5102-2 (HPSI HDR #2 Hot Leg Injection) closed                                                         YES NO N/A
YES NO N/A 10.
: 13.       2CV-5016-2 (HPSI HDR #2 to 2P-32A Loop) closed                                                           YES NO N/A
2CV-5649-1 (CNTMT Sump Suction Isol) closed YES NO N/A 2C16 11.
: 14.       2CV-5036-2 (HPSI HDR #2 to 2P-32B Loop) closed                                                           YES NO N/A
2CV-5631-2 (RWT 2T-3 outlet) open YES NO N/A 12.
: 15.       2CV-5056-2 (HPSI HDR #2 to 2P-32C Loop) closed                                                           YES NO N/A
2CV-5102-2 (HPSI HDR #2 Hot Leg Injection) closed YES NO N/A 13.
: 16.       2CV-5076-2 (HPSI HDR #2 to 2P-32D Loop) closed                                                           YES NO N/A
2CV-5016-2 (HPSI HDR #2 to 2P-32A Loop) closed YES NO N/A 14.
: 17.       2P-89C operable if aligned to B header (If not required for auto start, then HS in PTL.)                 YES NO N/A
2CV-5036-2 (HPSI HDR #2 to 2P-32B Loop) closed YES NO N/A 15.
: 18.       2P-89B operable (If not required for auto start, then HS in PTL.)                                         YES NO N/A
2CV-5056-2 (HPSI HDR #2 to 2P-32C Loop) closed YES NO N/A 16.
: 19.       2CV-5648-2 (CNTMT Sump Suction Isol) locked open, key removed                                             YES NO N/A
2CV-5076-2 (HPSI HDR #2 to 2P-32D Loop) closed YES NO N/A 17.
: 20.       2CV-5650-2 (CNTMT Sump Suction Isol) closed                                                               YES NO N/A Are required ECCS (HPSI) subsystems operable?                                                           YES NO form title:                                                                                  form no.              change no.
2P-89C operable if aligned to B header (If not required for auto start, then HS in PTL.)
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                                                  1015.016 B  24-01-0
YES NO N/A 18.
2P-89B operable (If not required for auto start, then HS in PTL.)
YES NO N/A 19.
2CV-5648-2 (CNTMT Sump Suction Isol) locked open, key removed YES NO N/A 20.
2CV-5650-2 (CNTMT Sump Suction Isol) closed YES NO N/A Are required ECCS (HPSI) subsystems operable?
YES NO


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 10 OF 13 O.         SERVICE WATER (2C16 AND 2C17)
form title:
form no.
change no.
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 10 OF 13 O.
SERVICE WATER (2C16 AND 2C17)
Two independent SW loops are required operable (TS 3.7.3.1)
Two independent SW loops are required operable (TS 3.7.3.1)
Valves Must Be Energized 2C17
Valves Must Be Energized 2C17 1.
: 1.       2CV-1453-1 (SDC HX 2E-35A SW Inlet) closed                                             YES NO
2CV-1453-1 (SDC HX 2E-35A SW Inlet) closed YES NO 2.
: 2.       SW Pump 2P-4B - Disconnect closed if aligned to Loop 1                                 YES NO N/A 1
SW Pump 2P-4B - Disconnect closed if aligned to Loop 1 YES NO N/A 1 3.
: 3.       SW Pump 2P-4B powered from RED train and operable                                     YES NO N/A
SW Pump 2P-4B powered from RED train and operable YES NO N/A 4.
: 4.       SW Pump 2P-4A operable                                                                 YES NO
SW Pump 2P-4A operable YES NO 5.
: 5.       2CV-1400-1 (SW ESF Header Isol) open                                                   YES NO
2CV-1400-1 (SW ESF Header Isol) open YES NO 6.
: 6.       2CV-1541-1 (SW Return to ECP) closed                                                   YES NO 2C16
2CV-1541-1 (SW Return to ECP) closed YES NO 2C16 7.
: 7.       2CV-1456-2 (SDC HX 2E-35B SW Inlet) closed                                             YES NO
2CV-1456-2 (SDC HX 2E-35B SW Inlet) closed YES NO 8.
: 8.       SW Pump 2P-4B - Disconnect closed if aligned to Loop 2                                 YES NO N/A
SW Pump 2P-4B - Disconnect closed if aligned to Loop 2 YES NO N/A 9.
: 9.       SW Pump 2P-4B powered from GREEN train and operable.                                   YES NO N/A
SW Pump 2P-4B powered from GREEN train and operable.
: 10.       SW Pump 2P-4C operable                                                                 YES NO
YES NO N/A 10.
: 11.       2CV-1406-2 (SW ESF Header Isol) open                                                   YES NO
SW Pump 2P-4C operable YES NO 11.
: 12.       2CV-1560-2 (SW Return to ECP) closed                                                   YES NO Are required SW pumps and loops operable?                                             YES NO P.         ESF PUMP RECIRCS Two independent ECCS subsystems are required operable in Mode 1, 2 & 3 with PZR pressure > 1700 psia (TS 3.5.2).
2CV-1406-2 (SW ESF Header Isol) open YES NO 12.
One ECCS subsystem is required operable in Modes 3 & 4 with PZR pressure < 1700 psia (TS 3.5.3). Valves must be energized.
2CV-1560-2 (SW Return to ECP) closed YES NO Are required SW pumps and loops operable?
: 1.       2CV-5123-1 (LPSI 2P-60A Recirc Isol) open                                               YES NO N/A
YES NO P.
: 2.       2CV-5673-1 (CNTMT Spray 2P-35A Recirc Isol) open                                       YES NO N/A
ESF PUMP RECIRCS Two independent ECCS subsystems are required operable in Mode 1, 2 & 3 with PZR pressure > 1700 psia (TS 3.5.2).
: 3.       2CV-5124-1 (LPSI 2P-60B Recirc Isol) open                                               YES NO N/A
One ECCS subsystem is required operable in Modes 3 & 4 with PZR pressure < 1700 psia (TS 3.5.3).
: 4.       2CV-5672-1 (CNTMT Spray 2P-35B Recirc Isol) open                                       YES NO N/A
Valves must be energized.
: 5.       2CV-5126-1 (HPSI 2P-89A Recirc Isol) open                                               YES NO N/A
1.
: 6.       2CV-5128-1 (HPSI 2P-89B Recirc Isol) open                                               YES NO N/A
2CV-5123-1 (LPSI 2P-60A Recirc Isol) open YES NO N/A 2.
: 7.       2CV-5127-1 (HPSI 2P-89C Recirc Isol) open                                               YES NO N/A
2CV-5673-1 (CNTMT Spray 2P-35A Recirc Isol) open YES NO N/A 3.
: 8.       2CV-5628-2 (ESF Mini-Recirc Header Isol) open                                           YES NO N/A Are required ESF recirc valves open?                                                   YES NO form title:                                                                form no.              change no.
2CV-5124-1 (LPSI 2P-60B Recirc Isol) open YES NO N/A 4.
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                                1015.016 B    24-01-0
2CV-5672-1 (CNTMT Spray 2P-35B Recirc Isol) open YES NO N/A 5.
2CV-5126-1 (HPSI 2P-89A Recirc Isol) open YES NO N/A 6.
2CV-5128-1 (HPSI 2P-89B Recirc Isol) open YES NO N/A 7.
2CV-5127-1 (HPSI 2P-89C Recirc Isol) open YES NO N/A 8.
2CV-5628-2 (ESF Mini-Recirc Header Isol) open YES NO N/A Are required ESF recirc valves open?
YES NO


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 11 OF 13 Q.         CONTAINMENT SPRAY SYSTEM Two independent Containment Spray Systems are required operable in Modes 1, 2 & 3 (TS 3.6.2.1)                 Valves Must Be Energized 2C17
form title:
: 1.       2CV-5612-1 (CNTMT Spray Header Isol) closed                                                           YES NO N/A
form no.
: 2.       CNTMT Spray Pump 2P-35A operable                                                                       YES NO N/A
change no.
: 3.       2CV-5647-1 (CNTMT Sump Suction Isol) locked open, key removed                                         YES NO N/A
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
: 4.       2CV-5649-1 (CNTMT Sump Suction Isol) closed                                                           YES NO N/A 2C16
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 11 OF 13 Q.
: 5.       2CV-5613-2 (CNTMT Spray Header Isol) closed                                                           YES NO N/A
CONTAINMENT SPRAY SYSTEM Two independent Containment Spray Systems are required operable in Modes 1, 2 & 3 (TS 3.6.2.1)
: 6.       CNTMT Spray Pump 2P-35B operable                                                                       YES NO N/A
Valves Must Be Energized 2C17 1.
: 7.       2CV-5648-2 (CNTMT Sump Suction Isol) locked open, key removed                                         YES NO N/A
2CV-5612-1 (CNTMT Spray Header Isol) closed YES NO N/A 2.
: 8.       2CV-5650-2 (CNTMT Sump Suction Isol) closed                                                           YES NO N/A Are required Spray Systems operable?                                                                   YES NO N/A R.         CONTAINMENT FIREWATER (2C16)
CNTMT Spray Pump 2P-35A operable YES NO N/A 3.
2CV-5647-1 (CNTMT Sump Suction Isol) locked open, key removed YES NO N/A 4.
2CV-5649-1 (CNTMT Sump Suction Isol) closed YES NO N/A 2C16 5.
2CV-5613-2 (CNTMT Spray Header Isol) closed YES NO N/A 6.
CNTMT Spray Pump 2P-35B operable YES NO N/A 7.
2CV-5648-2 (CNTMT Sump Suction Isol) locked open, key removed YES NO N/A 8.
2CV-5650-2 (CNTMT Sump Suction Isol) closed YES NO N/A Are required Spray Systems operable?
YES NO N/A R.
CONTAINMENT FIREWATER (2C16)
Containment penetration firewater system is required operable. (Fire Spec 9D.3, 1000.152) Valve Must Be Energized.
Containment penetration firewater system is required operable. (Fire Spec 9D.3, 1000.152) Valve Must Be Energized.
: 1.       2CV-3200-2 (CNTMT Firewater Isol) closed                                                                 YES     NO form title:                                                                              form no.              change no.
1.
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                                              1015.016 B    24-01-0
2CV-3200-2 (CNTMT Firewater Isol) closed YES NO


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 12 OF 13 S.         HIGH POINT VENTS (2C336-1 AND 2C336-2)
form title:
Position verification per NUREG-0737 Item II.B.1
form no.
: 1.       2HS-4671-1 (High Point Vents Control Power) On                                                       YES     NO
change no.
: 2.       2SV-4668-1 (Rx Head Vent) Closed                                                                     YES     NO
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
: 3.       2SV-4636-1 (Pressurizer Vent) Closed                                                                 YES     NO
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 12 OF 13 S.
: 4.       2SV-4669-1 (Vent to Quench Tank) Closed                                                               YES     NO
HIGH POINT VENTS (2C336-1 AND 2C336-2)
: 5.       2HS-4671-2 (High Point Vents Control Power) On                                                       YES     NO
Position verification per NUREG-0737 Item II.B.1 1.
: 6.       2SV-4668-2 (Rx Head Vent) Closed                                                                     YES     NO
2HS-4671-1 (High Point Vents Control Power) On YES NO 2.
: 7.       2SV-4636-2 (Pressurizer Vent) Closed                                                                 YES     NO
2SV-4668-1 (Rx Head Vent) Closed YES NO 3.
: 8.       2SV-4670-2 (Vent to CNTMT Atmosphere) Closed                                                         YES     NO T.         FUSE BLOCKS
2SV-4636-1 (Pressurizer Vent) Closed YES NO 4.
: 1.       2C16 Fuse blocks (2) - Fuses not blown.                                                               YES     NO
2SV-4669-1 (Vent to Quench Tank) Closed YES NO 5.
: 2.       2C17 Fuse blocks (2) - Fuses not blown.                                                               YES     NO
2HS-4671-2 (High Point Vents Control Power) On YES NO 6.
: 3.       2C33-1 Fuse blocks (1) - Fuses not blown.                                                             YES     NO
2SV-4668-2 (Rx Head Vent) Closed YES NO 7.
: 4.       2C33-2 Fuse blocks (1) - Fuses not blown.                                                             YES     NO U.         ANNUNCIATORS
2SV-4636-2 (Pressurizer Vent) Closed YES NO 8.
: 1.       Annunciator test for all Control Room Annunciators completed?.                                       YES     NO
2SV-4670-2 (Vent to CNTMT Atmosphere) Closed YES NO T.
: 2.       Alarms acknowledged on all reflash units 2C10(1); 2C11(1); 2C14(5); 2C16(1); 2C17(1); 2C32(1);       YES      NO 2C33(3)
FUSE BLOCKS 1.
: 3.       All annunciator disabling toggle switches ON (UP)?                                                   YES     NO V.         FIRE BRIGADE
2C16 Fuse blocks (2) - Fuses not blown.
: 1.       Qualified Fire Brigade assigned?                                                                     YES     NO form title:                                                                            form no.              change no.
YES NO 2.
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                                            1015.016 B    24-01-0
2C17 Fuse blocks (2) - Fuses not blown.
YES NO 3.
2C33-1 Fuse blocks (1) - Fuses not blown.
YES NO 4.
2C33-2 Fuse blocks (1) - Fuses not blown.
YES NO U.
ANNUNCIATORS 1.
Annunciator test for all Control Room Annunciators completed?.
YES NO 2.
Alarms acknowledged on all reflash units 2C10(1); 2C11(1); 2C14(5); 2C16(1); 2C17(1); 2C32(1);
2C33(3)
YES NO 3.
All annunciator disabling toggle switches ON (UP)?
YES NO V.
FIRE BRIGADE 1.
Qualified Fire Brigade assigned?
YES NO


SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 13 OF 13 W.         MAIN STEAM AND MAIN FEEDWATER
form title:
: 1.       IF MSSV(s) inoperable, THEN perform the following:
form no.
ST 2 A. Refer to 1015.016Q (MTC vs EFPD AND POWER) to obtain limiting MTC value B. Refer to Tech Spec Figure 3.7-1 (Maximum High Linear Power Level and Trip Setpoint Versus MTC) and use MTC value obtained from 1015.016Q to obtain High Linear Power Level Trip Setpoint for 1 MSSV inoperable or 1 MSSV/header inoperable.
change no.
: 2.       IF a component required for MFW isolation becomes inoperable (i.e., a Condensate, MFW, or Heater Drain pump will not trip on MSIS NA or CSAS),
SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B
THEN restore the component within 48 hours or place it in its MSIS or CSAS actuated state. Otherwise be in Hot Standby in 6 hours.
24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 13 OF 13 W.
COMMENTS:
MAIN STEAM AND MAIN FEEDWATER 1.
IF MSSV(s) inoperable, THEN perform the following:
A. Refer to 1015.016Q (MTC vs EFPD AND POWER) to obtain limiting MTC value B. Refer to Tech Spec Figure 3.7-1 (Maximum High Linear Power Level and Trip Setpoint Versus MTC) and use MTC value obtained from 1015.016Q to obtain High Linear Power Level Trip Setpoint for 1 MSSV inoperable or 1 MSSV/header inoperable.
ST 2 2.
IF a component required for MFW isolation becomes inoperable (i.e., a Condensate, MFW, or Heater Drain pump will not trip on MSIS or CSAS),
THEN restore the component within 48 hours or place it in its MSIS or CSAS actuated state.
Otherwise be in Hot Standby in 6 hours.
NA COMMENTS:
1 'B' Service water pump is out of service for repacking.
1 'B' Service water pump is out of service for repacking.
2   2PSV-1054 is inoperable; Maximum High Linear Power level and Trip Setpoint determined to be 87.5%.
2 2PSV-1054 is inoperable; Maximum High Linear Power level and Trip Setpoint determined to be 87.5%.
__________________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
If position manned, then list on shift personnel:
If position manned, then list on shift personnel:
SM                         Sam Manager               CRS       Charlie Supervisor CRSA           NA                                     TRO       NA CBOR             Robert Reactor                       CBOT       Sam Turbine WCO                 William Operator                   AO       Art Jones EOP             Eddie Plant                           SE       Emil Engineer PERFORMED BY:               Sam Turbine REVIEWED BY: ___________________________________________________________________
SM Sam Manager CRS Charlie Supervisor CRSA NA TRO NA CBOR Robert Reactor CBOT Sam Turbine WCO William Operator AO Art Jones EOP Eddie Plant SE Emil Engineer PERFORMED BY: Sam Turbine REVIEWED BY: ___________________________________________________________________
form title:                                                            form no.              change no.
SHIFT TURNOVER CHECKLIST MODES 1 - 4                                            1015.016 B    24-01-0


TUOI: ANO-2-JPM-NRC-KEY                                                           Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:     2                       REV #:   000                     DATE:
TUOI: ANO-2-JPM-NRC-KEY Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:
SYSTEM/DUTY AREA:           Conduct of Operations (A.1)
2 REV #:
TASK:       Determine requirements for issuing Containment air lock access key.
000 DATE:
SYSTEM/DUTY AREA:
Conduct of Operations (A.1)
TASK:
Determine requirements for issuing Containment air lock access key.
JTA#:
JTA#:
KA VALUE       RO:         2.0     SRO:         2.9       KA  
KA VALUE RO:
2.0 SRO:
2.9 KA  


==REFERENCE:==
==REFERENCE:==
2.1.13 APPROVED FOR ADMINISTRATION TO:           RO:             SRO:   X TASK LOCATION:           INSIDE CR:             OUTSIDE CR:           BOTH:         X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
2.1.13 APPROVED FOR ADMINISTRATION TO:
PLANT SITE:                       SIMULATOR:         Perform       CLASSROOM:     Perform POSITION EVALUATED:         RO:                   SRO:
RO:
ACTUAL TESTING ENVIRONMENT:         SIMULATOR:             PLANT SITE:         CLASSROOM:
SRO:
TESTING METHOD:         SIMULATE:             PERFORM:
X TASK LOCATION:
APPROXIMATE COMPLETION TIME IN MINUTES:                 20 Minutes REFERENCE(S):     1015.005A, Shift Managers Key Log, 1015.005, Operations Key Control and Unit 2 Tech Specs.
INSIDE CR:
EXAMINEE'S NAME:                                                 SSN:
OUTSIDE CR:
BOTH:
X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform CLASSROOM:
Perform POSITION EVALUATED:
RO:
SRO:
ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
CLASSROOM:
TESTING METHOD:
SIMULATE:
PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:
20 Minutes REFERENCE(S):
1015.005A, Shift Managers Key Log, 1015.005, Operations Key Control and Unit 2 Tech Specs.
EXAMINEE'S NAME:
SSN:
EVALUATOR'S NAME:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                     UNSATISFACTORY:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
Start Time             Stop Time             Total Time SIGNED:                                             DATE:
Start Time Stop Time Total Time SIGNED:
DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


TUOI: ANO-2-JPM-NRC-KEY                                                           Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
TUOI: ANO-2-JPM-NRC-KEY Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
Line 944: Line 1,460:
* Containment Personnel Hatch was last closed on July 5, 2001 at 1900 with all required surveillances completed.
* Containment Personnel Hatch was last closed on July 5, 2001 at 1900 with all required surveillances completed.
* Irvin Calibrate is ready to enter the Unit 2 Containment Building. Access is required for on-line surveillance testing. This testing will continue for the next three days under MAI
* Irvin Calibrate is ready to enter the Unit 2 Containment Building. Access is required for on-line surveillance testing. This testing will continue for the next three days under MAI
  # 57449 on 'B' SIT instrumentation on 386' elevation.
# 57449 on 'B' SIT instrumentation on 386' elevation.
* Radiation Protection requirements have been completed and HP, Roger Health, badge number 3432, is requesting key for entry to Containment Personnel Hatch (#298).
* Radiation Protection requirements have been completed and HP, Roger Health, badge number 3432, is requesting key for entry to Containment Personnel Hatch (#298).
TASK STANDARD: Determine the following requirements for issuance of the Containment Personnel Hatch key:
TASK STANDARD: Determine the following requirements for issuance of the Containment Personnel Hatch key:
* Status board entry for Containment Personnel Hatch LLRT due.
Status board entry for Containment Personnel Hatch LLRT due.
* Status board entry for Containment visual inspection per form 1015.016M is required daily, and when entry complete and prior to LLRT on Containment Personnel Hatch.
Status board entry for Containment visual inspection per form 1015.016M is required daily, and when entry complete and prior to LLRT on Containment Personnel Hatch.
* Inform NP&S to enter requirements onto daily and surveillance schedule.
Inform NP&S to enter requirements onto daily and surveillance schedule.
* Ensure daily visual inspection of areas affected and final inspection at completion of entry is performed using form 1015.016M and a station log entry is performed to satisfy Tech Spec 4.5.2.C.2.
Ensure daily visual inspection of areas affected and final inspection at completion of entry is performed using form 1015.016M and a station log entry is performed to satisfy Tech Spec 4.5.2.C.2.
* Ensure that during the first entry Tech Spec 4.6.1.3.2 required surveillance on the Containment Personnel Hatch door interlock (task 020626) is performed.
Ensure that during the first entry Tech Spec 4.6.1.3.2 required surveillance on the Containment Personnel Hatch door interlock (task 020626) is performed.
* Obtain Name, Badge number and signature of person receiving the key.
Obtain Name, Badge number and signature of person receiving the key.
TASK PERFORMANCE AIDS: OP 1015.005A, Shift Manager's Key Log and 1015.005, Operations Key Control and Unit 2 Tech Spec's.
TASK PERFORMANCE AIDS: OP 1015.005A, Shift Manager's Key Log and 1015.005, Operations Key Control and Unit 2 Tech Spec's.


TUOI: ANO-2-JPM-NRC-KEY                                                                   Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
TUOI: ANO-2-JPM-NRC-KEY Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
Determine the requirements for issuance of the Containment Personnel Hatch access key and Containment Building entry and complete required form to issue key per 1015.005, Operations Key Control.
Determine the requirements for issuance of the Containment Personnel Hatch access key and Containment Building entry and complete required form to issue key per 1015.005, Operations Key Control.
CRITICAL ELEMENTS (C)           3, 5, 6 PERFORMANCE CHECKLIST                               STANDARD                       (Circle One)
CRITICAL ELEMENTS (C) 3, 5, 6 PERFORMANCE CHECKLIST STANDARD (Circle One)
N/A SAT UNSAT
: 1. Review OP 1015.005, Operations Key Control to determine requirements.
: 1. Review OP 1015.005,                     Examinee reviewed steps 6.1 Operations Key Control to              and 6.5 of 1015.005 to determine requirements.                determine requirements for issuing key.
Examinee reviewed steps 6.1 and 6.5 of 1015.005 to determine requirements for issuing key.
EXAMINER'S NOTE: If candidate asks, report that I&C is entering Containment immediately after the issuance of the key and the requirements after entry are applicable. HP is the person receiving the Key.
N/A SAT UNSAT EXAMINER'S NOTE: If candidate asks, report that I&C is entering Containment immediately after the issuance of the key and the requirements after entry are applicable. HP is the person receiving the Key.
: 2. Using 1015.005 log key number, Individual's name, individual's badge number, MAI number, SM name, Date/Time key issued to Containment Personnel Hatch.
Examinee obtained key number(298), name (Roger Health), badge number (3432),
MAI number (57449) and signature of person receiving the key from initial conditions.
Examinee signed and dated with the time that key was issued.
N/A SAT UNSAT (C)
: 3. Using 1015.005 determine status board entry requirements.
EXAMINER'sCUE:
If asked, HES-02 requires LLRT within 7 days of completion of this maintenance.
Examinee determined Status board entry:
* Containment Personnel Hatch LLRT due
* Containment visual inspection per form 1015.016M.
N/A SAT UNSAT
N/A SAT UNSAT
: 2. Using 1015.005 log key                  Examinee obtained key number, Individual's name,            number(298), name (Roger individual's badge number,            Health), badge number (3432),
: 4. Using 1015.005 determine need to inform NP&S to enter requirements onto daily and surveillance schedule.
MAI number, SM name,                  MAI number (57449) and Date/Time key issued to               signature of person receiving Containment Personnel                  the key from initial conditions.
Examinee contacted or discussed requirement to inform NP&S to enter requirements onto daily and surveillance schedule.
Hatch.                                Examinee signed and dated with the time that key was issued.
N/A SAT UNSAT (C) 3. Using 1015.005 determine                  Examinee determined Status status board entry                    board entry:
requirements.
* Containment Personnel Hatch LLRT due EXAMINER'sCUE:
* Containment visual If asked, HES-02 requires LLRT                inspection per form within 7 days of completion of                1015.016M.
this maintenance.
N/A SAT UNSAT
N/A SAT UNSAT
: 4. Using 1015.005 determine                Examinee contacted or need to inform NP&S to enter          discussed requirement to requirements onto daily and            inform NP&S to enter surveillance schedule.                requirements onto daily and surveillance schedule.


TUOI: ANO-2-JPM-NRC-KEY                                                       Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                         STANDARD                 (Circle One)
TUOI: ANO-2-JPM-NRC-KEY Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)
N/A SAT UNSAT (C) 5. Using 1015.005 determine         Examinee determined a need to satisfy Tech Spec         required daily visual inspection 4.5.2.C.2 surveillance           of areas affected using form requirements for containment      1015.016M along with a entry.                            station log entry and a required final inspection at the completion of entry using form 1015.016M and a station log entry.
(C)
N/A SAT UNSAT (C) 6. Using 1015.005 determine         Examinee determined need satisfy Tech Spec           surveillance on the 4.6.1.3.2 surveillance           Containment Personnel Hatch requirements for containment      door interlock (task 020626) entry.                            on initial entry needed to satisfy 4.6.1.3.2 surveillance requirements.
: 5. Using 1015.005 determine need to satisfy Tech Spec 4.5.2.C.2 surveillance requirements for containment entry.
EXAMINER's NOTE: If asked about mechanical support for Containment Personnel Hatch door interlock surveillance, report that mechanics are standing by the personnel hatch ready to perform surveillance on the initial entry into containment building.
Examinee determined a required daily visual inspection of areas affected using form 1015.016M along with a station log entry and a required final inspection at the completion of entry using form 1015.016M and a station log entry.
N/A SAT UNSAT (C)
: 6. Using 1015.005 determine need satisfy Tech Spec 4.6.1.3.2 surveillance requirements for containment entry.
Examinee determined surveillance on the Containment Personnel Hatch door interlock (task 020626) on initial entry needed to satisfy 4.6.1.3.2 surveillance requirements.
N/A SAT UNSAT EXAMINER's NOTE: If asked about mechanical support for Containment Personnel Hatch door interlock surveillance, report that mechanics are standing by the personnel hatch ready to perform surveillance on the initial entry into containment building.
END
END


TUOI: ANO-2-JPM-NRC-KEY                                                           Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
TUOI: ANO-2-JPM-NRC-KEY Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
* The plant is at 100% power.
* The plant is at 100% power.
* Green train maintenance week; minimal risk.
* Green train maintenance week; minimal risk.
Line 985: Line 1,509:
* Containment Personnel Hatch was last closed on July 5, 2001 at 1900 with all required surveillances completed.
* Containment Personnel Hatch was last closed on July 5, 2001 at 1900 with all required surveillances completed.
* Irvin Calibrate is ready to enter the Unit 2 Containment Building. Access is required for on-line surveillance testing. This testing will continue for the next three days under MAI
* Irvin Calibrate is ready to enter the Unit 2 Containment Building. Access is required for on-line surveillance testing. This testing will continue for the next three days under MAI
  # 57449 on 'B' SIT instrumentation on 386' elevation.
# 57449 on 'B' SIT instrumentation on 386' elevation.
* Radiation Protection requirements have been completed and HP, Roger Health, badge number 3432, is requesting key for entry to Containment Personnel Hatch (#298).
* Radiation Protection requirements have been completed and HP, Roger Health, badge number 3432, is requesting key for entry to Containment Personnel Hatch (#298).
INITIATING CUE:
INITIATING CUE:
Determine the requirements for issuance of the Containment Personnel Hatch access key and Containment Building entry and complete required form to issue key per 1015.005, Operations Key Control.
Determine the requirements for issuance of the Containment Personnel Hatch access key and Containment Building entry and complete required form to issue key per 1015.005, Operations Key Control.


TUOI: ANO-2-JPM-NRC-KEY                                                           Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
TUOI: ANO-2-JPM-NRC-KEY Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
* The plant is at 100% power.
* The plant is at 100% power.
* Green train maintenance week; minimal risk.
* Green train maintenance week; minimal risk.
Line 996: Line 1,520:
* Containment Personnel Hatch was last closed on July 5, 2001 at 1900 with all required surveillances completed.
* Containment Personnel Hatch was last closed on July 5, 2001 at 1900 with all required surveillances completed.
* Irvin Calibrate is ready to enter the Unit 2 Containment Building. Access is required for on-line surveillance testing. This testing will continue for the next three days under MAI
* Irvin Calibrate is ready to enter the Unit 2 Containment Building. Access is required for on-line surveillance testing. This testing will continue for the next three days under MAI
  # 57449 on 'B' SIT instrumentation on 386' elevation.
# 57449 on 'B' SIT instrumentation on 386' elevation.
* Radiation Protection requirements have been completed and HP, Roger Health, badge number 3432, is requesting key for entry to Containment Personnel Hatch (#298).
* Radiation Protection requirements have been completed and HP, Roger Health, badge number 3432, is requesting key for entry to Containment Personnel Hatch (#298).
INITIATING CUE:
INITIATING CUE:
Determine the requirements for issuance of the Containment Personnel Hatch access key and Containment Building entry and complete required form to issue key per 1015.005, Operations Key Control.
Determine the requirements for issuance of the Containment Personnel Hatch access key and Containment Building entry and complete required form to issue key per 1015.005, Operations Key Control.


TUOI: ANO-2-JPM-NRC-KI                                                           Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:     2                     REV #:     000                     DATE:
TUOI: ANO-2-JPM-NRC-KI Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:
SYSTEM/DUTY AREA:         Radiation Controls (A.3)
2 REV #:
TASK:       Approve administration of Potassium Iodide.
000 DATE:
SYSTEM/DUTY AREA:
Radiation Controls (A.3)
TASK:
Approve administration of Potassium Iodide.
JTA#:
JTA#:
KA VALUE       RO:       2.9     SRO:         3.3       KA  
KA VALUE RO:
2.9 SRO:
3.3 KA  


==REFERENCE:==
==REFERENCE:==
2.3.10 APPROVED FOR ADMINISTRATION TO:           RO:             SRO:   X TASK LOCATION:           INSIDE CR:               OUTSIDE CR:           BOTH:       X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
2.3.10 APPROVED FOR ADMINISTRATION TO:
PLANT SITE:                       SIMULATOR:           Perform       CLASSROOM:   Perform POSITION EVALUATED:       RO:                     SRO:
RO:
ACTUAL TESTING ENVIRONMENT:         SIMULATOR:             PLANT SITE:       CLASSROOM:
SRO:
TESTING METHOD:       SIMULATE:               PERFORM:
X TASK LOCATION:
APPROXIMATE COMPLETION TIME IN MINUTES:                 15 Minutes REFERENCE(S):     1903.035, Administration of Potassium Iodide EXAMINEE'S NAME:                                                 SSN:
INSIDE CR:
OUTSIDE CR:
BOTH:
X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform CLASSROOM:
Perform POSITION EVALUATED:
RO:
SRO:
ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
CLASSROOM:
TESTING METHOD:
SIMULATE:
PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
1903.035, Administration of Potassium Iodide EXAMINEE'S NAME:
SSN:
EVALUATOR'S NAME:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                     UNSATISFACTORY:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
Start Time           Stop Time               Total Time SIGNED:                                             DATE:
Start Time Stop Time Total Time SIGNED:
DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


TUOI: ANO-2-JPM-NRC-KI                                                         Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
TUOI: ANO-2-JPM-NRC-KI Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
Line 1,028: Line 1,580:
* LOCA EOP is being implemented.
* LOCA EOP is being implemented.
* RDACS indicates an off site release in progress.
* RDACS indicates an off site release in progress.
* Data indicates I-131 concentration of 5.0 E-04 &#xb5; ci/cc in area of work in Upper South Piping Penetration room.
* Data indicates I-131 concentration of 5.0 E-04 &#xb5;&#xb5;&#xb5;&#xb5; ci/cc in area of work in Upper South Piping Penetration room.
* Whole body dose rates in area of work are 1Rem/hr.
* Whole body dose rates in area of work are 1Rem/hr.
* General Emergency has just been declared.
* General Emergency has just been declared.
Line 1,038: Line 1,590:
TASK PERFORMANCE AIDS: OP 1903.0035, Potassium Iodide Administration, completed form 1903.035C, ANO Medical Questionnaire-Iodine Sensitivity and 1903.035A, Potassium Iodide Administration.
TASK PERFORMANCE AIDS: OP 1903.0035, Potassium Iodide Administration, completed form 1903.035C, ANO Medical Questionnaire-Iodine Sensitivity and 1903.035A, Potassium Iodide Administration.


TUOI: ANO-2-JPM-NRC-KI                                                                 Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
TUOI: ANO-2-JPM-NRC-KI Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
Determine the need to issue KI, Potassium Iodide and complete necessary paperwork, using OP 1903.035.
Determine the need to issue KI, Potassium Iodide and complete necessary paperwork, using OP 1903.035.
CRITICAL ELEMENTS (C)           2, 3, 5 PERFORMANCE CHECKLIST                             STANDARD                     (Circle One)
CRITICAL ELEMENTS (C) 2, 3, 5 PERFORMANCE CHECKLIST STANDARD (Circle One)
: 1. Review OP 1903.035, Administration of Potassium Iodide to determine criteria for administering KI.
Examinee determined the criteria for administration of KI is 25 REM exposure to Thyroid committed dose equivalent or if concentration is unknown, the possibility exists for receiving large amounts of radioactive airborne iodine.
N/A SAT UNSAT (C)
: 2. Using graph on 1903.035 and information provided in initial conditions, determine that Joe Mechanic will exceed 25 REM during the maintenance evolution.
Determined that expected exposure will exceed 25 REM threshold.
N/A SAT UNSAT (C)
: 3. Determine that Joe Mechanic is not sensitive to nor experienced an allergic reaction to Iodide.
EXAMINER's CUE: Give examinee completed 1903.035C form.
Ask Joe Mechanic for completed 1903.035C form and determined that Joe Mechanic was not sensitive to nor experienced an allergic reaction to Iodide.
N/A SAT UNSAT
N/A SAT UNSAT
: 1. Review OP 1903.035,                    Examinee determined the Administration of Potassium            criteria for administration of KI Iodide to determine criteria for      is 25 REM exposure to administering KI.                      Thyroid committed dose equivalent or if concentration is unknown, the possibility exists for receiving large amounts of radioactive airborne iodine.
N/A SAT UNSAT (C)  2. Using graph on 1903.035                Determined that expected Attachment 1 and information          exposure will exceed 25 REM provided in initial conditions,        threshold.
determine that Joe Mechanic will exceed 25 REM during the maintenance evolution.
N/A SAT UNSAT (C)  3. Determine that Joe Mechanic            Ask Joe Mechanic for is not sensitive to nor                completed 1903.035C form experienced an allergic                and determined that Joe reaction to Iodide.                    Mechanic was not sensitive to nor experienced an allergic EXAMINER's CUE: Give                      reaction to Iodide.
examinee completed 1903.035C form.


TUOI: ANO-2-JPM-NRC-KI                                                 Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                       STANDARD               (Circle One)
TUOI: ANO-2-JPM-NRC-KI Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)
N/A SAT UNSAT
: 4. Complete form 1903.035A.
: 4. Complete form 1903.035A.       Completed all areas of form 1903.035A, Potassium Iodide Administration, from initial conditions:
Completed all areas of form 1903.035A, Potassium Iodide Administration, from initial conditions:
* Estimated Thyroid dose commitment.
* Estimated Thyroid dose commitment.
* Date.
* Date.
* Respiratory protection.
* Respiratory protection.
* Signature of Joe Mechanic that he chooses to receive KI.
* Signature of Joe Mechanic that he chooses to receive KI.
N/A SAT UNSAT (C)     5. Determine that KI may be     Examinee approved approved for distribution to distribution of KI to Joe Joe Mechanic during the      Mechanic by signing and Upper South Piping          dating form.
N/A SAT UNSAT (C)
penetration room work.
: 5. Determine that KI may be approved for distribution to Joe Mechanic during the Upper South Piping penetration room work.
END
Examinee approved distribution of KI to Joe Mechanic by signing and dating form.
N/A SAT UNSAT END


TUOI: ANO-2-JPM-NRC-KI                                                         Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
TUOI: ANO-2-JPM-NRC-KI Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
* The plant is tripped from 100% power.
* The plant is tripped from 100% power.
* 300 gpm LOCA in progress.
* 300 gpm LOCA in progress.
Line 1,065: Line 1,622:
* LOCA EOP is being implemented.
* LOCA EOP is being implemented.
* RDACS indicates an off site release in progress.
* RDACS indicates an off site release in progress.
* Data indicates I-131 concentration of 5.0 E-04 &#xb5; ci/cc in area of work in Upper South Piping Penetration room.
* Data indicates I-131 concentration of 5.0 E-04 &#xb5;&#xb5;&#xb5;&#xb5; ci/cc in area of work in Upper South Piping Penetration room.
* Whole body dose rates in area of work are 1Rem/hr.
* Whole body dose rates in area of work are 1Rem/hr.
* General Emergency has just been declared.
* General Emergency has just been declared.
Line 1,075: Line 1,632:
Determine the need to issue KI, Potassium Iodide and complete necessary paperwork, using OP 1903.035.
Determine the need to issue KI, Potassium Iodide and complete necessary paperwork, using OP 1903.035.


TUOI: ANO-2-JPM-NRC-KI                                                         Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
TUOI: ANO-2-JPM-NRC-KI Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
* The plant is tripped from 100% power.
* The plant is tripped from 100% power.
* 300 gpm LOCA in progress.
* 300 gpm LOCA in progress.
Line 1,081: Line 1,638:
* LOCA EOP is being implemented.
* LOCA EOP is being implemented.
* RDACS indicates an off site release in progress.
* RDACS indicates an off site release in progress.
* Data indicates I-131 concentration of 5.0 E-04 &#xb5; ci/cc in area of work in Upper South Piping Penetration room.
* Data indicates I-131 concentration of 5.0 E-04 &#xb5;&#xb5;&#xb5;&#xb5; ci/cc in area of work in Upper South Piping Penetration room.
* Whole body dose rates in area of work are 1Rem/hr.
* Whole body dose rates in area of work are 1Rem/hr.
* General Emergency has just been declared.
* General Emergency has just been declared.

Latest revision as of 18:12, 16 January 2025

Unit 2-May-2002-Final Operating Exam
ML021560244
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 06/03/2002
From: Gody A
NRC Region 4
To: Anderson C
Entergy Operations
References
-RFPFR, 50-368/02303
Download: ML021560244 (64)


Text

TUOI: ANO-2-JPM-NRC-CNTMT00 Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:

2 REV #:

000 DATE:

SYSTEM/DUTY AREA:

Equipment Control (A.2)

TASK:

Determine actions for maintaining configuration control with inoperable containment penetration isolation valve.

JTA#:

KA VALUE RO:

2.1 SRO:

3.0 KA

REFERENCE:

2.2.14 APPROVED FOR ADMINISTRATION TO:

RO:

SRO:

X TASK LOCATION:

INSIDE CR:

OUTSIDE CR:

BOTH:

X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

SIMULATOR:

Perform CLASSROOM:

Perform POSITION EVALUATED:

RO:

SRO:

ACTUAL TESTING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

CLASSROOM:

TESTING METHOD:

SIMULATE:

PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES:

15 Minutes REFERENCE(S):

Unit 2 Tech Specs, P&ID's, OP 1015.034, Containment Penetration Administration Control and 2104.014, LRW and BMS Operations.

EXAMINEE'S NAME:

SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED:

DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

TUOI: ANO-2-JPM-NRC-CNTMT00 Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

  • The plant is at 100% power and Steady State.
  • New CVCS resin bed, 2T36A, is being placed in service. 2CVC-12A is approximately 1 turn open. Currently an approximate 100 ppm difference exists between RCS and DI effluent.
  • CCW leak exists on common supply line to RCP's inside containment of ~ 0.5 gpm.
  • Maintenance on CCW line is expected to occur in 7 days.
  • Containment sump draining via normal drain to Aux Building Sump is completed.
  • Maintenance on 2CV 2061-2, Containment Sump Isolation valve, is expected to take 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

TASK STANDARD: Determine the following requirements for controlling containment penetration isolation due to inoperable 2CV-2061-2, Containment Sump Isolation valve:

TS 3.6.3.1 is applicable.

Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, to comply with Tech Spec 3.6.3.1, containment penetration '2P68' must be isolated by closing 2CV-2060-1, Containment Sump Isolation valve and deenergizing the valve.

To maintain configuration control on 2CV 2060-1, a clearance tag should be installed on the breaker. It is also acceptable to record position of the valve status on 1015.034A, Containment Penetration Valve Log or the Component Out of Position Computer log.

TASK PERFORMANCE AIDS: OP 1015.034, Containment Penetration Administrative Control, OP 2104.014, LRW and BMS Operations and PID 2213 sh1 and 8.

TUOI: ANO-2-JPM-NRC-CNTMT00 Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

Based on initial conditions, determine the Tech Spec applicability and required actions, including administrative configuration controls required.

CRITICAL ELEMENTS (C) 1, 2, 3 PERFORMANCE CHECKLIST STANDARD (Circle One)

(C)

1. Review OP 1015.034, Containment Penetration Administrative Control and identify Tech Spec 3.6.3.1 applicability.

Examinee determined that 2CV-2061-2, Containment Sump Isolation valve, failure to close required entry into Tech Spec 3.6.3.1 four-hour action statement.

N/A SAT UNSAT (C)

2. Determine that Tech Spec compliance is achieved by closing and controlling the operation of valve 2CV-2060-1, Containment Sump Isolation valve, using P&ID 2213 SH 1 and 2.

Examinee determined that closing 2CV-2060-1, Containment Sump Isolation valve, and maintaining containment penetration "2P68" secure is required for Tech Spec compliance.

N/A SAT UNSAT

TUOI: ANO-2-JPM-NRC-CNTMT00 Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)

(C)

3. Plant configuration control maintained by placing a clearance tag on the supply breaker, 2B51-B2 to 2CV-2060-1, Containment Sump Isolation valve, in the open position.

EXAMINER's CUE:

Report that 2CV 2060-1 is in a high radiation area and a local lock or clearance tag is not required.

Examinee complied with TS 3.6.3.1 and maintained plant configuration control of penetration by:

  • Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> containment penetration '2P68' must be secured by opening the supply breaker to 2CV-2060-1, Containment Sump Isolation valve, 2B51-B1.

AND

  • Placing a Clearance tag on the breaker in open position.

OR

  • Recording position of the valve and breaker in the COOP log or Containment penetration valve log.

N/A SAT UNSAT EXAMINERS NOTE: The Candidate may discuss use of a clearance tag on the drain valves 2ABS 2061A and 2ABS 2061B. Also, the candidate may discuss gagging the thermal relief in the penetration 2PSV 2000.

These steps are not required for successful completion of this JPM.

END

TUOI: ANO-2-JPM-NRC-CNTMT00 Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

  • The plant is at 100% power and Steady State.
  • New CVCS resin bed, 2T36A, is being placed in service. 2CVC-12A is approximately 1 turn open. Currently an approximate 100 ppm difference exists between RCS and DI effluent.
  • CCW leak exists on common supply line to RCP's inside containment of ~ 0.5 gpm.
  • Maintenance on CCW line is expected to occur in 7 days.
  • Containment sump draining via normal drain to Aux Building Sump is completed.
  • Maintenance on 2CV 2061-2, Containment Sump Isolation valve, is expected to take 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

INITIATING CUE:

Based on initial conditions, determine the Tech Spec applicability and required actions, including administrative configuration controls required.

TUOI: ANO-2-JPM-NRC-CNTMT00 Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

  • The plant is at 100% power and Steady State.
  • New CVCS resin bed, 2T36A, is being placed in service. 2CVC-12A is approximately 1 turn open. Currently an approximate 100 ppm difference exists between RCS and DI effluent.
  • CCW leak exists on common supply line to RCP's inside containment of ~ 0.5 gpm.
  • Maintenance on CCW line is expected to occur in 7 days.
  • Containment sump draining via normal drain to Aux Building Sump is completed.
  • Maintenance on 2CV 2061-2, Containment Sump Isolation valve, is expected to take 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

INITIATING CUE:

Based on initial conditions, determine the Tech Spec applicability and required actions, including administrative configuration controls required.

TUOI: ANO-2-JPM-NRC-EPLANEC Page 1 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:

2 REV #:

000 DATE:

SYSTEM/DUTY AREA:

Emergency Plan (A.4)

TASK:

Determine EAL Classification and complete Shift Manager paperwork.

JTA#:

KA VALUE RO:

2.2 SRO:

4.0 KA

REFERENCE:

2.4.38 APPROVED FOR ADMINISTRATION TO:

RO:

SRO:

X TASK LOCATION:

INSIDE CR:

OUTSIDE CR:

BOTH:

X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

SIMULATOR:

Perform CLASSROOM:

Perform POSITION EVALUATED:

RO:

SRO:

ACTUAL TESTING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

CLASSROOM:

TESTING METHOD:

SIMULATE:

PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES:

20 Minutes REFERENCE(S):

1903.011, Emergency Response / Notifications, 1903.010, EAL EXAMINEE'S NAME:

SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED:

DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

TUOI: ANO-2-JPM-NRC-EPLANEC Page 2 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

  • The plant is tripped 30 minutes ago from 100% power for 250 days.
  • RCS Tc is 450°F and cool down in progress.
  • HPSI Flow total is 900 gpm.
  • PZR pressure is 825 psia.
  • 850 gpm LOCA inside containment.
  • Plant evacuation nor Exclusion Area evacuation have NOT been initiated.
  • Valid RDACS alarm present 2K11 J10.
  • Dose Assessment reports that RDACS indicates a release is in progress with the following projected Dose Rates:
  • 0.62 mile dose rate of 0.350 REM/HR TEDE and 0.550 REM/HR Thyroid
  • 1.45 mile dose rate of 0.035 REM/HR TEDE and 0.053 REM/HR Thyroid
  • 3.45 mile dose rate of 0.004 REM/HR TEDE and 0.005 REM/HR Thyroid
  • 7.23 mile dose rate of 0.000 REM/HR TEDE and 0.000 REM/HR Thyroid
  • Dose Assessment reports that RDACS indicates a release is in progress with the following projected dose:
  • 0.62 mile dose of 1.400 REM TEDE and 2.201 REM Thyroid
  • 1.45 mile dose of 0.140 REM TEDE and 0.210 REM Thyroid
  • 3.45 mile dose of 0.014 REM TEDE and 0.021 REM Thyroid
  • 7.23 mile dose of 0.002 REM TEDE and 0.002 REM Thyroid
  • RDACS is indicating evacuate Zone 'G' and shelter the remaining zones.
  • Wind direction is from 190° and speed is 11 mph.
  • 2RY-8925-1, High Range Containment Radiation Monitor is reading 705 R/HR.
  • 2RY-8925-2, High Range Containment Radiation Monitor is reading 723 R/HR.
  • Containment pressure is 34 psia.
  • All other systems and actuations are operating as designed.

TASK STANDARD: Determine the following:

GE; EAL 1.7, or 5.4, Radiological Effluents 250mr/hr TEDE or 500mr/hr Child Thyroid CDE and use 1903.011S form.

PAR 1 & PAR 3, zones evacuated are G, K, N.

and shelter the remaining zones.

Perform plant evacuation by route 1 and 3.

Perform exclusion area evacuation.

TASK PERFORMANCE AIDS: 1903.010, Emergency Action Levels; 1903.011, Emergency Response / Notifications; Steam Tables

TUOI: ANO-2-JPM-NRC-EPLANEC Page 3 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

Determine the highest EAL classification and PAR, if required, from the given initial conditions and complete applicable Shift Manager emergency direction and control checklist.

CRITICAL ELEMENTS (C) 1, 2, 5, 8, 10,11,13 PERFORMANCE CHECKLIST STANDARD (Circle One)

(C)

1. Review OP 1903.010, EAL for classifying event using Step 4.10, 4.11 and EAL index.

Examinee determined the Proper EAL classification was a GE based on EAL 1.7, challenge or failure of 3 fission product barriers and/or EAL 5.4, Radiological Effluents 250mr/hr TEDE or 500mr/hr Child Thyroid CDE N/A SAT UNSAT (C)

2. Determine that 1903.011S, GE emergency direction and control checklist for shift manager was appropriate checklist for event.

Examinee determined that 1903.011S was appropriate form for event in progress.

N/A SAT UNSAT

3. Determine initial notification paperwork completion and ENS notifications are required.

EXAMINER's CUE:

Inform examinee that the Initial notification paperwork and ENS notifications are being completed by opposite unit Shift Engineer.

Examinee determined that Initial notification paperwork and ENS notifications are required and would direct the shift engineer to complete it.

N/A SAT UNSAT

4. Determine need to inform control room staff of EAL.

Inform Control Room staff that a General Emergency has been declared on Unit 2 due to EAL 1.7 or 5.4.

TUOI: ANO-2-JPM-NRC-EPLANEC Page 4 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)

(C)

5. Determine Evacuation routes 1 and 3 are appropriate due to wind direction being from 190°.

Examinee determined that plant evacuation routes 1 and 3 should be used.

N/A SAT UNSAT EXAMINER's NOTE: No areas need to be avoided during plant evacuation.

6. Identify need to contact Security for performance of initial accountability within 30 minutes and for notification that plant evacuation is required.

EXAMINER's CUE:

Inform Examinee that security has been contacted.

Examinee determined that security must be contacted to perform initial accountability within 30 minutes and that a plant evacuation is required.

N/A SAT UNSAT EXAMINER's NOTE: Secondary Guard station does not need to be opened and manned.

7. Identify need to notify HP to monitor personnel at exit portal monitors.

EXAMINER's CUE:

Inform examinee that HP has been contacted to perform personnel monitoring at exit portal monitors and to relax decontamination and radiation protection measures as necessary to expedite evacuation.

Examinee determined that HP is needed to monitor personnel at exit portal monitors and relax decontamination and radiation protection measures as necessary to expedite evacuation.

N/A SAT UNSAT

TUOI: ANO-2-JPM-NRC-EPLANEC Page 5 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)

(C)

8. Determine need to perform Plant Evacuation.

EXAMINER's CUE:

Inform examinee that SE has performed steps 9 and 10 of 1903.011S when either a plant announcement has been started or when requested that SE perform actions.

Examinee determined that plant evacuation is required and needs to make announcement.

N/A SAT UNSAT

9. Identify need to instruct Control Room personnel to log badges into card reader for initial accountability.

EXAMINER's CUE:

Inform examinee that control room personnel on both unit's have been notified and both unit's NLO's have been notified.

Determined that Control Room personnel and NLO's on both unit's must be notified to log badges into card reader for initial accountability.

N/A SAT UNSAT (C) 10.Perform Exclusion area Evacuation.

EXAMINER's CUE:

Inform examinee that security and Corp of Engineers have been informed.

Examinee determined that exclusion area evacuation is required and needs to direct security to perform it and the Corp of Engineers also must be notified to access portions of the lake within the exclusion area by boat.

N/A SAT UNSAT

TUOI: ANO-2-JPM-NRC-EPLANEC Page 6 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)

(C)

11. Using 1903.011 attachment 8 and attachment 6, determine that PAR 1 and 3 should be recommended and zones

'G, K, N' should be evacuated and shelter the remaining zones.

Examinee determined that PAR 1 and PAR 3 should be combined and zones

'G, K, N' from PAR 1 and Zone 'G' from PAR 3 should be evacuated and shelter the remaining zones.

N/A SAT UNSAT

12. Determine that chemistry should be contacted to monitor RDACS.

EXAMINER's CUE:

Inform examinee that Chemistry has been informed and reports that RDACS indicates a radioactive plume extending over the Sally Port and north plant access road to highway 333.

Examinee determined that chemistry should monitor RDACS.

N/A SAT UNSAT (C)

13. Determine that Security needs to be informed that approach route to the plant via the route impacted by the radioactive plume should be avoided.

EXAMINER's CUE:

Inform examinee that security has been informed.

Examinee determined that security should be informed that evacuation route 2 or the areas affected by the radioactive plume to the plant should be avoided.

N/A SAT UNSAT END

TUOI: ANO-2-JPM-NRC-EPLANEC Page 7 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

  • The plant tripped 30 minutes ago after operating at 100% power for 250 days.
  • RCS Tc is 450°F and cool down in progress.
  • HPSI Flow total is 900 gpm.
  • PZR pressure is 825 psia.
  • 800 gpm LOCA inside containment.
  • Plant evacuation has NOT been initiated.
  • Valid RDACS alarm present 2K11 J10.
  • Dose Assessment reports that RDACS indicates a release is in progress with the following projected Dose Rates:
  • 0.62 mile dose rate of 0.350 REM/HR TEDE and 0.550 REM/HR Thyroid
  • 1.45 mile dose rate of 0.035 REM/HR TEDE and 0.053 REM/HR Thyroid
  • 3.45 mile dose rate of 0.004 REM/HR TEDE and 0.005 REM/HR Thyroid
  • 7.23 mile dose rate of 0.000 REM/HR TEDE and 0.000 REM/HR Thyroid
  • Dose Assessment reports that RDACS indicates a release is in progress with the following projected dose:
  • 0.62 mile dose of 1.400 REM TEDE and 2.201 REM Thyroid
  • 1.45 mile dose of 0.140 REM TEDE and 0.210 REM Thyroid
  • 3.45 mile dose of 0.014 REM TEDE and 0.021 REM Thyroid
  • 7.23 mile dose of 0.002 REM TEDE and 0.002 REM Thyroid
  • RDACS is indicating evacuate Zone 'G' and shelter the remaining zones.
  • Wind direction is from 190° and speed is 11 mph.
  • 2RY-8925-1, High Range Containment Radiation Monitor is reading 705 R/HR.
  • 2RY-8925-2, High Range Containment Radiation Monitor is reading 723 R/HR.
  • Containment pressure is 34 psia.
  • All other systems and actuations are operating as designed.

INITIATING CUE:

Determine the highest EAL classification and PAR, if required, from the given initial conditions and complete applicable Shift Manager emergency direction and control checklist.

TUOI: ANO-2-JPM-NRC-EPLANEC Page 8 of 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

  • The plant is tripped 30 minutes ago from 100% power for 250 days.
  • RCS Tc is 450°F and cool down in progress.
  • HPSI Flow total is 900 gpm.
  • PZR pressure is 825 psia.
  • 800 gpm LOCA inside containment.
  • Plant evacuation has NOT been initiated.
  • Valid RDACS alarm present 2K11 J10.
  • Dose Assessment reports that RDACS indicates a release is in progress with the following projected Dose Rates:
  • 0.62 mile dose rate of 0.350 REM/HR TEDE and 0.550 REM/HR Thyroid
  • 1.45 mile dose rate of 0.035 REM/HR TEDE and 0.053 REM/HR Thyroid
  • 3.45 mile dose rate of 0.004 REM/HR TEDE and 0.005 REM/HR Thyroid
  • 7.23 mile dose rate of 0.000 REM/HR TEDE and 0.000 REM/HR Thyroid
  • Dose Assessment reports that RDACS indicates a release is in progress with the following projected dose:
  • 0.62 mile dose of 1.400 REM TEDE and 2.201 REM Thyroid
  • 1.45 mile dose of 0.140 REM TEDE and 0.210 REM Thyroid
  • 3.45 mile dose of 0.014 REM TEDE and 0.021 REM Thyroid
  • 7.23 mile dose of 0.002 REM TEDE and 0.002 REM Thyroid
  • RDACS is indicating evacuate Zone 'G' and shelter the remaining zones.
  • Wind direction is from 190° and speed is 11 mph.
  • 2RY-8925-1, High Range Containment Radiation Monitor is reading 705 R/HR.
  • 2RY-8925-2, High Range Containment Radiation Monitor is reading 723 R/HR.
  • Containment pressure is 34 psia.
  • All other systems and actuations are operating as designed.

INITIATING CUE:

Determine the highest EAL classification and PAR, if required, from the given initial conditions and complete applicable Shift Manager emergency direction and control checklist.

TUOI: ANO-2-JPM-NRC-MSSVINOP Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:

2 REV #:

000 DATE:

SYSTEM/DUTY AREA:

Conduct of Operations (A.1)

TASK:

Verify RPS trip setpoint determination for inoperable MSSV JTA#:

KA VALUE RO:

3.0 SRO:

3.4 KA

REFERENCE:

2.1.3 APPROVED FOR ADMINISTRATION TO:

RO:

SRO:

X TASK LOCATION:

INSIDE CR:

OUTSIDE CR:

BOTH:

X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

SIMULATOR:

Perform CLASSROOM:

Perform POSITION EVALUATED:

RO:

SRO:

ACTUAL TESTING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

CLASSROOM:

TESTING METHOD:

SIMULATE:

PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES:

15 Minutes REFERENCE(S):

Form 1015.016B, Shift turnover checklist, form 1015.016Q, MTC VS EFPD and power and Unit 2 Tech Specs.

EXAMINEE'S NAME:

SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED:

DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

TUOI: ANO-2-JPM-NRC-MSSVINOP Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

  • The plant is at 80% power, 325 EFPD, Steady State.
  • Plant refueling outage is expected to start in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
  • 2P-4B, 'B' SW pump, is out of service for repacking.
  • TSI, Turbine Supervisory Instrumentation is DISABLED to work on MTG vibration probe.
  • MSSV testing is in progress.
  • The CBOT has completed the Shift Turnover checklist.
  • All other systems are aligned in normal Mode 1 configuration.

TASK STANDARD: Verify shift turnover checklist and independently determine the maximum High Linear Power Level and RPS trip setpoint to be 88.5 to 86.5% to comply with Technical Specification 3.7.1.1.

TASK PERFORMANCE AIDS: Shift Turnover Checklist, form 1015.016B, Unit 2 Tech Specs, Moderator Temperature Coefficient VS EFPD and Power, form 1015.016Q, and a straight edge.

TUOI: ANO-2-JPM-NRC-MSSVINOP Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

As oncoming CRS, based on initial conditions, verify the shift turnover checklist for correctness.

CRITICAL ELEMENTS (C) 3, 4 PERFORMANCE CHECKLIST STANDARD (Circle One)

EXAMINER's NOTE: TSI disabled on the MTG has no impact on plant operation or shift turnover checklist. The out of service 'B' service water pump has no Tech Spec implications due to 'A' and 'C' service water pumps being operable.

1. Review Shift turnover checklist for correctness.

EXAMINER's CUE:

Inform examinee that an independent review of the values for maximum linear power and trip setpoint derived by CBOT is required.

Examinee reviewed shift turnover checklist.

N/A SAT UNSAT

2. Determine that 'B' service water pump inoperability had no Tech Spec implication.

Examinee correctly determined that 'A' and 'C' service water pumps being operable satisfied the Tech Spec requirement for two independent service water loops.

N/A SAT UNSAT (C)

3. Using form 1015.016Q, determine MTC for 325 EFPD to be approximately -1.4 X E-4 delta K/K/degree F.

Examinee correctly derived from graph based on 325 EFPD and 80% power curve that MTC is approximately

-1.4 X E-4 delta K/K/degree F.

N/A SAT UNSAT

TUOI: ANO-2-JPM-NRC-MSSVINOP Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)

(C)

4. Using Tech Spec 3.7.1 figure 3.7-1 determines new maximum power and RPS linear power trip setpoint to be 87.5% +/- 1%.

Examinee correctly derived from graph based on MTC of -

1.4XE-4 delta K/K/degree F and knowing that one MSSV is inoperable determined that maximum power and RPS linear power trip setpoint should be 87.5% +/- 1%.

OR Examinee correctly interpolated from points given on the graph that maximum power and RPS linear power trip setpoint should be 87.5% +/-

1%.

N/A SAT UNSAT

5. Determine that the CBOT calculation for maximum power and RPS linear power trip setpoint is correct and sign 1015.016B reviewed by blank.

Examinee determined the maximum power and RPS linear power trip setpoint calculated by CBOT to be correct and signed 1015.016B reviewed by blank.

N/A SAT UNSAT EXAMINER's NOTE: Examinee may discuss the Tech Spec applicability at this point stating that Tech Spec 3.7.1.1 LCO to allows power operations to continue provided that within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> power is reduced to the maximum power of 79% or as allowed by figure 3.7-1 and within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, the RPS trip setpoint adjusted to be less than the value of 79% or as allowed in figure 3.7-1 per table 3.7-1, but this discussion is not required for successful completion of the JPM.

END

TUOI: ANO-2-JPM-NRC-MSSVINOP Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

  • The plant is at 80% power, 325 EFPD, Steady State.
  • Plant refueling outage is expected to start in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
  • 2P-4B, 'B' SW pump, is out of service for repacking.
  • TSI, Turbine Supervisory Instrumentation is DISABLED to work on MTG vibration probe.
  • MSSV testing is in progress.
  • The CBOT has completed the Shift Turnover checklist.
  • All other systems are aligned in normal Mode 1 configuration.

INITIATING CUE:

As oncoming CRS, based on initial conditions, verify the shift turnover checklist for correctness.

TUOI: ANO-2-JPM-NRC-MSSVINOP Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

  • The plant is at 80% power, 325 EFPD, Steady State.
  • Plant refueling outage is expected to start in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
  • 2P-4B, 'B' SW pump, is out of service for repacking.
  • TSI, Turbine Supervisory Instrumentation is DISABLED to work on MTG vibration probe.
  • MSSV testing is in progress.
  • The CBOT has completed the Shift Turnover checklist.
  • All other systems are aligned in normal Mode 1 configuration.

INITIATING CUE:

As oncoming CRS, based on initial conditions, verify the shift turnover checklist for correctness.

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 1 OF 13 INSTRUCTIONS:

1.0 CIRCLE YES, NO OR N/A FOR EACH ITEM IN ANY DESIRED ORDER.

2.0 N/A ITEMS NOT APPLICABLE DUE TO MODE OR BEING ALIGNED TO OTHER TRAIN.

3.0 IF NO IS CIRCLED, THEN EXPLAIN IN THE REMARKS SECTION.

4.0 IF NO IS CIRCLED ON A TECH SPEC (TS) REQUIRED COMPONENT, THEN REFER TO ASSOCIATED TECH SPEC ACTION STATEMENT AND NOTIFY OPPOSITE UNIT, AS APPLICABLE.

Mode:

1 Date:

current Time:

current A.

SDBCS ALIGNMENT (2C02) 1.

2CV-1002 (A S/G Upstream ADV Isol) closed YES NO 2.

2CV-1052 (B S/G Upstream ADV Isol) closed YES NO 3.

2CV-1001 (Upstream ADV) closed, HIC in Manual, permissive in Off YES NO 4.

2CV-1051 (Upstream ADV) closed, HIC in Manual, permissive in Off YES NO 5.

2CV-0301 (DDV) closed, HIC in Auto and permissive HS in Auto YES NO 6.

2CV-0305 (DDV) closed, HIC in Auto and permissive HS in Auto YES NO 7.

2CV-0302 (Bypass Vlv) closed, HIC in Auto, permissive HS in Auto YES NO 8.

2CV-0303 (Bypass Vlv) closed, HIC in Auto, permissive HS in Auto YES NO 9.

2CV-0306 (Bypass Vlv) closed, HIC in Auto, permissive HS in Auto YES NO B.

SHUTDOWN COOLING (2C04)

Two independent ECCS subsytems required operable in Mode 1, 2 & 3 with PZR pressure 1700 psia.

(TS 3.5.2) 1.

2CV-5091 (LPSI Disch Header) open.

YES NO N/A 2.

2HS-5091 in ESF with the key removed.

YES NO N/A 3.

2FIC-5091 (LPSI Disch Hdr Flow) in Auto & set at ~ 2400 gpm.

YES NO N/A

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 2 OF 13 C.

BORATION WATER SOURCES Each of the following borated water sources shall be operable: BAMT(s)

IAW 2104.003 Supplement 4 Figure 1 (TRM 3.1.2.8) and RWT. (TRM 3.1.2.8) 1.

BAM Tanks 2T-6A and/or 2T-6B in the acceptable region of 2104.003 Supplement 4 Figure 1 YES NO 2.

Boric Acid Tank (2T-6A) Temperature > 55°F YES NO 3.

Boric Acid Tank (2T-6B) Temperature > 55°F YES NO 4.

RWT Level 92% to 99%

YES NO 5.

RWT Boron Concentration 2500 to 3000 ppm YES NO 6.

RWT Temperature 47 to 110°F (CR-2-00-687)

YES NO Are required operable boron water sources available?

YES NO

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 3 OF 13 D.

BORATION FLOW PATHS AND COMPONENTS (2C09 AND 2C33)

At least two charging pumps required operable. (TRM 3.1.2.4)

At least one charging pump in the Boron Injection Flow Path required operable. (TRM 3.1.2.2) 1.

2P-36A, associated room cooler, and room cooler SW valve operable.

YES NO 2.

2P-36B, associated room cooler, and room cooler SW valve operable.

YES NO 3.

2P-36C, associated room cooler and room cooler SW valve operable all powered from the same train (RED or GREEN).

YES NO 4.

Boric Acid Pump (2P-39A) operable.

YES NO 5.

Boric Acid Pump (2P-39B) operable.

YES NO 6.

2CV-4916-2 (Emergency Borate) operable YES NO 7.

2CV-4920-1 (Gravity Feed) operable.

YES NO 8.

2CV-4921-1 (Gravity Feed) operable.

YES NO 9.

2CV-4950-2 (RWT to CCP suction) operable.

YES NO 10.

2CV-4873-1 (VCT Outlet ) operable YES NO Circle Paths/component(s) for which credit taken (TRM 3.1.2.2)

ONE BAMT meets Volume Requirements - 2 of 3 paths required:

  • One flow path from the appropriate BAM tank via a BAM pump and a Charging pump.
  • One flow path from the appropriate BAM tank via Gravity Feed connection and Charging pump.
  • One flow path from the RWT via a Charging pump.

BOTH BAMTs needed to meet Volume Requirements - 4 of 5 paths required:

  • One flow path from BAM tank A via a BAM pump and a Charging pump.
  • One flow path from BAM tank B via a BAM pump and a Charging pump.
  • One flow path from BAM tank A via Gravity Feed connection and Charging pump.
  • One flow path from BAM tank B via Gravity Feed connection and Charging pump.

One flow path from the RWT tank via a Charging pump.

Are required boron injection flow paths operable for the operable boron water source? (TRM 3.1.2.2)

YES NO Are at least two charging pumps operable, one on each train?

(TRM 3.1.2.4)

YES NO

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 4 OF 13 E.

EMERGENCY DIESEL GENERATORS (2C33)

Two Diesel Generators are required operable. (TS 3.8.1.1) 1.

2DG1 Trouble/Not Available alarms clear YES NO 2.

2HS-2809-1 (Engine Start) in Normal After Stop YES NO 3.

2DG2 Trouble/Not Available alarms clear YES NO 4.

2HS-2829-2 (Engine Start) in Normal After Stop YES NO Are both EDGs operable?

YES NO F.

AC ELECTRICAL SYSTEMS (2C10, 2C33 AND SPDS)

Two independent circuits between offsite transmission network and onsite ESF buses shall be operable.

(TS 3.8.1.1)

SU2 HS may be in PTL with breaker available.

1.

Circle Operable Circuits RED GREEN SU2 SU3 SU2 SU3 2A1 2A1 2A2 2A2 2A3 2A3 2A4 2A4 Are two physically independent circuits between the offsite transmission network and onsite ESF buses operable?

YES NO Both trains of ESF Electrical buses shall be operable & energized with tie breakers open between redundant buses.

(TS 3.8.2.1) 2RS1, 2, 3 & 4 are required to be operable.

(TS 3.8.2.1) 2.

Circle Operable Circuits RED GREEN 2A3 2A4 2B5 2B6 2B51 2B61 2B52 2B62 2B53 2B63 2B54 2B64 2RS1 ~ 120V on SPDS (Note) 2RS2 ~ 120V on SPDS (Note) 2RS3 ~ 120V on SPDS (Note) 2RS4 ~ 120V on SPDS (Note) 2RS1 inverter trouble 2RS2 inverter trouble alarm clear alarm clear 2RS3 inverter trouble 2RS4 inverter trouble alarm clear alarm clear 2A-310 IN PTL 2A-410 IN PTL 2B-513 IN PTL 2B-613 IN PTL Are both ESF electrical trains operable and energized with tie breakers open between redundant buses?

YES NO Note: If a swing inverter is in service, then verify RS Panel voltage

~ 120V on SPDS using computer point E2RS1RS3 or E2RS2RS4.

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 5 OF 13 G.

DC ELECTRICAL SYSTEMS (2C10, 2C33 AND SPDS)

Both trains of DC electrical sources shall be operable with each train consisting of a 125 VDC bus, a battery bank & a full capacity charger. (TS 3.8.2.3)

DC Buses are verified operable by checking corresponding Undervoltage, Not Available, and Trouble alarms clear and bus voltage normal (~130V) on SPDS.

Circle Operable Trains RED GREEN 2DO1 2D02 2D11 2D12 2D31A OR 2D31B 2D32A OR 2D32B Are both trains of DC electrical sources operable?

YES NO H.

CONTROL ROOM EMERGENCY AIR CONDITIONING AND VENTILATION SYSTEMS (2C33, C19 AND LOCAL)

Two independent Control Room Emergency Air Conditioning and Air Filtration Systems are required operable.

(Unit 2 TS 3.3.3.1, Table 3.3-6, 3.7.6.1 and TRM 3.3.3.7 and Unit 1 TS 3.5.1.13, Table 3.5.1-1, 3.9.1, 3.9.2 and TRM 3.5.1) 1.

2VSF-9 operable and handswitch in AUTO.

YES NO 2.

2VE-1A and 2VUC-27A operable.

YES NO 3.

2VE-1B and 2VUC-27B operable.

YES NO 4.

At least one Control Room Rad Monitor (2RITS-8750-1A or 2RITS-8750-1B) operable and indicating between minimum and maximum values from OPS B-28 and OPS B-43.

(TS 3.3.3.1)

YES NO 5.

Both 2DG1 and 2DG2 operable YES NO 6.

ESF Buses separated (NOT cross-tied)

YES NO 7.

Chlorine Monitors operable (Unit 2 TRM 3.3.3.7, Unit 1 TRM 3.5.1)

YES NO 8.

VSF-9 operable and handswitch in Auto.

YES NO 9.

VSF-9 aligned to operable EDG power source.

YES NO 10.

At least one Unit One CR Rad Monitor operable.

(2RITS-8001A or 2RITS-8001B)

YES NO Are required CR Emergency Air Conditioning and Filtration Systems operable?

YES NO If NO is circled, then notify Unit 1 of equipment status and refer to Tech Specs.

11.

Control Room Emergency AC units (2VUC-27A & 2VUC-27B) drain loop seals (2SG-8600A and 2SG-8600B) indicate > 1.5 H2O above bottom of sightglass?

Add water at 1.5 H2O Initiate Condition Report at 1 H2O

[ER002956E202, CR-ANO-C-2001-0175]

YES NO

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 6 OF 13 I.

EMERGENCY FEEDWATER Two EFW pumps and associated flow paths are required operable in Mode 1, 2 & 3. (TS 3.7.1.2) All valves except 2CV-0707 and 2CV-1532-1 must be energized. 2CV-0711-2 (2P-7A Suction from SW)/2CV-0716-1 (2P-7B Suction from SW) checked OPEN or OPERABLE is required for surveillance action if SW is supply to EFW (TS 4.7.1.3.2) 2C33 1.

2CV-0707 - Heaters removed, valve open. Check open by either remote or local position indication.

YES NO N/A 2.

2EFW-0706 (SU/BD Demin Effluent to EFW) closed when > 10%.

YES NO N/A 2C17 3.

2CV-1000-1 (Main Steam to EFWP Turbine 2K-3) open.

YES NO N/A 4.

2CV-1038-2 (2P-7B Discharge to S/G A) open.

YES NO N/A 5.

2CV-1036-2 (2P-7B Discharge to S/G B) open.

YES NO N/A 6.

2CV-1025-1 (2P-7B Flow Control to S/G A) closed.

YES NO N/A 7.

2CV-1075-1 (2P-7B Flow Control to S/G B) closed.

YES NO N/A 8.

2CV-0716-1 (2P-7B Suction From SW) closed.

YES NO N/A 9.

2CV-0789-1 (2P-7B Suction From CST) open.

YES NO N/A 10.

EFW Pump 2P-7B operable.

YES NO N/A 11.

EFW Pump 2P-7B Room Cooler 2VUC-6B operable. (CR-ANO-2-2000-0109)

YES NO N/A 12.

EFW Pump 2P-7B Room Cooler 2VUC-6B SW MOV 2CV-1532-1 operable OR de-energized open. (CR-ANO-2-2000-0109)

YES NO N/A 2C16 13.

2CV-1050-2 (Main Steam to EFWP Turbine 2K-3) open.

YES NO N/A 14.

2CV-1026-2 (2P-7A Discharge to S/G A) closed.

YES NO N/A 15.

2CV-1076-2 (2P-7A Discharge to S/G B) closed.

YES NO N/A 16.

2CV-1037-1 (2P-7A Discharge to S/G A) open.

YES NO N/A 17.

2CV-1039-1 (2P-7A Discharge to S/G B) open.

YES NO N/A 18.

2CV-0340-2 (Steam to EFWP Turbine 2K-3) closed.

YES NO N/A 19.

2CV-0711-2 (2P-7A Suction from SW) closed.

YES NO N/A 20.

2CV-0795-2 (2P-7A Suction from CST) open.

YES NO N/A Are required EFW pumps and associated flow paths operable?

YES NO N/A

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 7 OF 13 J.

CONTAINMENT PENETRATION ROOM EXHAUST VENTILATION Maintain either 2VEF-38A or 2VEF-38B in PTL to prevent both fans from auto starting on CIAS (CR-2-93-0061).

Circle Fan Status 2VEF-38A:

AUTO PTL 2VEF-38B:

AUTO PTL 1.

Is ONE Penetration Room Exhaust Fan in AUTO and ONE in PTL?

YES NO K.

CONTAINMENT COOLING SYSTEM Two independent Containment Cooling groups are required operable (TS 3.6.2.3), both fans in a group are required for that group to be operable.

Valves must be energized.

2C17 1.

CNTMT Cooling Fan 2VSF-1B operable.

YES NO 2.

2CV-1519-1 (2VSF-1A/1B SW Outlet) closed.

YES NO 3.

2CV-1511-1 (2VSF-1A/B SW Inlet) closed.

YES NO 4.

2SV-1511-1 (SW Bypass for 2CV-1511-1) open.

YES NO 5.

CNTMT Cooling Fan 2VSF-1A operable.

YES NO 2C16 6.

CNTMT Cooling Fan 2VSF-1D operable.

YES NO 7.

2CV-1513-2 (2VSF-1C/D SW Outlet) closed.

YES NO 8.

2CV-1510-2 (2VSF-1C/D SW Inlet) closed.

YES NO 9.

2SV-1510-2 (SW Bypass for 2CV-1510-2) open.

YES NO 10.

CNTMT Cooling Fan 2VSF-1C operable.

YES NO Are required Containment Cooling groups operable?

YES NO

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 8 OF 13 L.

SAFETY INJECTION TANKS SIT isolation valves are required to be open in Mode 1, 2 & 3 with PZR pressure 700 psia (TS 4.5.1.a.2) 2C17 1.

2CV-5003-1 (SIT 2T-2A Outlet) locked open, key removed.

YES NO N/A 2.

2CV-5023-1 (SIT 2T-2B Outlet) locked open, key removed.

YES NO N/A 2C16 3.

2CV-5043-2 (SIT 2T-2C Outlet) locked open, key removed.

YES NO N/A 4.

2CV-5063-2 (SIT 2T-2D Outlet) locked open, key removed.

YES NO N/A Are all required SIT outlet valves open?

YES NO N/A M.

LOW PRESSURE SAFETY INJECTION Two independent ECCS subsystems are required in Mode 1, 2 & 3 with PZR pressure 1700 psia (TS 3.5.2) Valves Must Be Energized 2C17 1.

2CV-5017-1 (LPSI to 2P-32A Loop) closed.

YES NO N/A 2.

LPSI Pump 2P-60A operable.

YES NO N/A 3.

2CV-5037-1 (LPSI to 2P-32B Loop) closed.

YES NO N/A 2C16 4.

2CV-5057-2 (LPSI to 2P-32C Loop) closed.

YES NO N/A 5.

LPSI Pump 2P-60B operable.

YES NO N/A 6.

2CV-5077-2 (LPSI to 2P-32D Loop) closed.

YES NO N/A Are required ECCS subsystems (LPSI) operable?

YES NO N/A

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 9 OF 13 N.

HIGH PRESSURE SAFETY INJECTION Two independent ECCS subsystems are required in Modes 1, 2 & 3 with PZR pressure 1700 psia (TS 3.5.2). One ECCS subsystem is required in Modes 3 & 4 with PZR pressure < 1700 psia (TS 3.5.3).

Valves must be energized except 2CV-5101-1 and 2CV-5102-2.

2C17 1.

2CV-5630-1 (RWT 2T-3 Outlet) open YES NO N/A 2.

2CV-5101-1 (HPSI HDR #1 Hot Leg Injection) closed YES NO N/A 3.

2CV-5015-1 (HPSI HDR #1 to 2P-32A Loop) closed YES NO N/A 4.

2CV-5035-1 (HPSI HDR #1 to 2P-32B Loop) closed YES NO N/A 5.

2CV-5055-1 (HPSI HDR #1 to 2P-32C Loop) closed YES NO N/A 6.

2CV-5075-1 (HPSI HDR #1 to 2P-32D Loop) closed YES NO N/A 7.

2P-89C operable if aligned to A header (If not required for auto start, then HS in PTL.)

YES NO N/A 8.

2P-89A operable (If not required for auto start, then HS in PTL.)

YES NO N/A 9.

2CV-5647-1 (CNTMT Sump Suction Isol) locked open, key removed)

YES NO N/A 10.

2CV-5649-1 (CNTMT Sump Suction Isol) closed YES NO N/A 2C16 11.

2CV-5631-2 (RWT 2T-3 outlet) open YES NO N/A 12.

2CV-5102-2 (HPSI HDR #2 Hot Leg Injection) closed YES NO N/A 13.

2CV-5016-2 (HPSI HDR #2 to 2P-32A Loop) closed YES NO N/A 14.

2CV-5036-2 (HPSI HDR #2 to 2P-32B Loop) closed YES NO N/A 15.

2CV-5056-2 (HPSI HDR #2 to 2P-32C Loop) closed YES NO N/A 16.

2CV-5076-2 (HPSI HDR #2 to 2P-32D Loop) closed YES NO N/A 17.

2P-89C operable if aligned to B header (If not required for auto start, then HS in PTL.)

YES NO N/A 18.

2P-89B operable (If not required for auto start, then HS in PTL.)

YES NO N/A 19.

2CV-5648-2 (CNTMT Sump Suction Isol) locked open, key removed YES NO N/A 20.

2CV-5650-2 (CNTMT Sump Suction Isol) closed YES NO N/A Are required ECCS (HPSI) subsystems operable?

YES NO

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 10 OF 13 O.

SERVICE WATER (2C16 AND 2C17)

Two independent SW loops are required operable (TS 3.7.3.1)

Valves Must Be Energized 2C17 1.

2CV-1453-1 (SDC HX 2E-35A SW Inlet) closed YES NO 2.

SW Pump 2P-4B - Disconnect closed if aligned to Loop 1 YES NO N/A 1 3.

SW Pump 2P-4B powered from RED train and operable YES NO N/A 4.

SW Pump 2P-4A operable YES NO 5.

2CV-1400-1 (SW ESF Header Isol) open YES NO 6.

2CV-1541-1 (SW Return to ECP) closed YES NO 2C16 7.

2CV-1456-2 (SDC HX 2E-35B SW Inlet) closed YES NO 8.

SW Pump 2P-4B - Disconnect closed if aligned to Loop 2 YES NO N/A 9.

SW Pump 2P-4B powered from GREEN train and operable.

YES NO N/A 10.

SW Pump 2P-4C operable YES NO 11.

2CV-1406-2 (SW ESF Header Isol) open YES NO 12.

2CV-1560-2 (SW Return to ECP) closed YES NO Are required SW pumps and loops operable?

YES NO P.

ESF PUMP RECIRCS Two independent ECCS subsystems are required operable in Mode 1, 2 & 3 with PZR pressure > 1700 psia (TS 3.5.2).

One ECCS subsystem is required operable in Modes 3 & 4 with PZR pressure < 1700 psia (TS 3.5.3).

Valves must be energized.

1.

2CV-5123-1 (LPSI 2P-60A Recirc Isol) open YES NO N/A 2.

2CV-5673-1 (CNTMT Spray 2P-35A Recirc Isol) open YES NO N/A 3.

2CV-5124-1 (LPSI 2P-60B Recirc Isol) open YES NO N/A 4.

2CV-5672-1 (CNTMT Spray 2P-35B Recirc Isol) open YES NO N/A 5.

2CV-5126-1 (HPSI 2P-89A Recirc Isol) open YES NO N/A 6.

2CV-5128-1 (HPSI 2P-89B Recirc Isol) open YES NO N/A 7.

2CV-5127-1 (HPSI 2P-89C Recirc Isol) open YES NO N/A 8.

2CV-5628-2 (ESF Mini-Recirc Header Isol) open YES NO N/A Are required ESF recirc valves open?

YES NO

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 11 OF 13 Q.

CONTAINMENT SPRAY SYSTEM Two independent Containment Spray Systems are required operable in Modes 1, 2 & 3 (TS 3.6.2.1)

Valves Must Be Energized 2C17 1.

2CV-5612-1 (CNTMT Spray Header Isol) closed YES NO N/A 2.

CNTMT Spray Pump 2P-35A operable YES NO N/A 3.

2CV-5647-1 (CNTMT Sump Suction Isol) locked open, key removed YES NO N/A 4.

2CV-5649-1 (CNTMT Sump Suction Isol) closed YES NO N/A 2C16 5.

2CV-5613-2 (CNTMT Spray Header Isol) closed YES NO N/A 6.

CNTMT Spray Pump 2P-35B operable YES NO N/A 7.

2CV-5648-2 (CNTMT Sump Suction Isol) locked open, key removed YES NO N/A 8.

2CV-5650-2 (CNTMT Sump Suction Isol) closed YES NO N/A Are required Spray Systems operable?

YES NO N/A R.

CONTAINMENT FIREWATER (2C16)

Containment penetration firewater system is required operable. (Fire Spec 9D.3, 1000.152) Valve Must Be Energized.

1.

2CV-3200-2 (CNTMT Firewater Isol) closed YES NO

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 12 OF 13 S.

HIGH POINT VENTS (2C336-1 AND 2C336-2)

Position verification per NUREG-0737 Item II.B.1 1.

2HS-4671-1 (High Point Vents Control Power) On YES NO 2.

2SV-4668-1 (Rx Head Vent) Closed YES NO 3.

2SV-4636-1 (Pressurizer Vent) Closed YES NO 4.

2SV-4669-1 (Vent to Quench Tank) Closed YES NO 5.

2HS-4671-2 (High Point Vents Control Power) On YES NO 6.

2SV-4668-2 (Rx Head Vent) Closed YES NO 7.

2SV-4636-2 (Pressurizer Vent) Closed YES NO 8.

2SV-4670-2 (Vent to CNTMT Atmosphere) Closed YES NO T.

FUSE BLOCKS 1.

2C16 Fuse blocks (2) - Fuses not blown.

YES NO 2.

2C17 Fuse blocks (2) - Fuses not blown.

YES NO 3.

2C33-1 Fuse blocks (1) - Fuses not blown.

YES NO 4.

2C33-2 Fuse blocks (1) - Fuses not blown.

YES NO U.

ANNUNCIATORS 1.

Annunciator test for all Control Room Annunciators completed?.

YES NO 2.

Alarms acknowledged on all reflash units 2C10(1); 2C11(1); 2C14(5); 2C16(1); 2C17(1); 2C32(1);

2C33(3)

YES NO 3.

All annunciator disabling toggle switches ON (UP)?

YES NO V.

FIRE BRIGADE 1.

Qualified Fire Brigade assigned?

YES NO

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 13 OF 13 W.

MAIN STEAM AND MAIN FEEDWATER 1.

IF MSSV(s) inoperable, THEN perform the following:

A. Refer to 1015.016Q (MTC vs EFPD AND POWER) to obtain limiting MTC value B. Refer to Tech Spec Figure 3.7-1 (Maximum High Linear Power Level and Trip Setpoint Versus MTC) and use MTC value obtained from 1015.016Q to obtain High Linear Power Level Trip Setpoint for 1 MSSV inoperable or 1 MSSV/header inoperable.

ST 2 2.

IF a component required for MFW isolation becomes inoperable (i.e., a Condensate, MFW, or Heater Drain pump will not trip on MSIS or CSAS),

THEN restore the component within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or place it in its MSIS or CSAS actuated state.

Otherwise be in Hot Standby in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

NA COMMENTS:

1 'B' Service water pump is out of service for repacking.

2 2PSV-1054 is inoperable; Maximum High Linear Power level and Trip Setpoint determined to be 87.5%.

If position manned, then list on shift personnel:

SM Sam Manager CRS Charlie Supervisor CRSA NA TRO NA CBOR Robert Reactor CBOT Sam Turbine WCO William Operator AO Art Jones EOP Eddie Plant SE Emil Engineer PERFORMED BY: Sam Turbine REVIEWED BY: ___________________________________________________________________

TUOI: ANO-2-JPM-NRC-MSSVINOP Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:

2 REV #:

000 DATE:

SYSTEM/DUTY AREA:

Conduct of Operations (A.1)

TASK:

Verify RPS trip setpoint determination for inoperable MSSV JTA#:

KA VALUE RO:

3.0 SRO:

3.4 KA

REFERENCE:

2.1.3 APPROVED FOR ADMINISTRATION TO:

RO:

SRO:

X TASK LOCATION:

INSIDE CR:

OUTSIDE CR:

BOTH:

X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

SIMULATOR:

Perform CLASSROOM:

Perform POSITION EVALUATED:

RO:

SRO:

ACTUAL TESTING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

CLASSROOM:

TESTING METHOD:

SIMULATE:

PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES:

15 Minutes REFERENCE(S):

Form 1015.016B, Shift turnover checklist, form 1015.016Q, MTC VS EFPD and power and Unit 2 Tech Specs.

EXAMINEE'S NAME:

SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED:

DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

TUOI: ANO-2-JPM-NRC-MSSVINOP Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

  • The plant is at 80% power, 325 EFPD, Steady State.
  • Plant refueling outage is expected to start in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
  • 2P-4B, 'B' SW pump, is out of service for repacking.
  • TSI, Turbine Supervisory Instrumentation is DISABLED to work on MTG vibration probe.
  • MSSV testing is in progress.
  • The CBOT has completed the Shift Turnover checklist.
  • All other systems are aligned in normal Mode 1 configuration.

TASK STANDARD: Verify shift turnover checklist and independently determine the maximum High Linear Power Level and RPS trip setpoint to be 88.5 to 86.5% to comply with Technical Specification 3.7.1.1.

TASK PERFORMANCE AIDS: Shift Turnover Checklist, form 1015.016B, Unit 2 Tech Specs, Moderator Temperature Coefficient VS EFPD and Power, form 1015.016Q, and a straight edge.

TUOI: ANO-2-JPM-NRC-MSSVINOP Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

As oncoming CRS, based on initial conditions, verify the shift turnover checklist for correctness.

CRITICAL ELEMENTS (C) 3, 4 PERFORMANCE CHECKLIST STANDARD (Circle One)

EXAMINER's NOTE: TSI disabled on the MTG has no impact on plant operation or shift turnover checklist. The out of service 'B' service water pump has no Tech Spec implications due to 'A' and 'C' service water pumps being operable.

1. Review Shift turnover checklist for correctness.

EXAMINER's CUE:

Inform examinee that an independent review of the values for maximum linear power and trip setpoint derived by CBOT is required.

Examinee reviewed shift turnover checklist.

N/A SAT UNSAT

2. Determine that 'B' service water pump inoperability had no Tech Spec implication.

Examinee correctly determined that 'A' and 'C' service water pumps being operable satisfied the Tech Spec requirement for two independent service water loops.

N/A SAT UNSAT (C)

3. Using form 1015.016Q, determine MTC for 325 EFPD to be approximately -1.4 X E-4 delta K/K/degree F.

Examinee correctly derived from graph based on 325 EFPD and 80% power curve that MTC is approximately

-1.4 X E-4 delta K/K/degree F.

N/A SAT UNSAT

TUOI: ANO-2-JPM-NRC-MSSVINOP Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)

(C)

4. Using Tech Spec 3.7.1 figure 3.7-1 determines new maximum power and RPS linear power trip setpoint to be 87.5% +/- 1%.

Examinee correctly derived from graph based on MTC of -

1.4XE-4 delta K/K/degree F and knowing that one MSSV is inoperable determined that maximum power and RPS linear power trip setpoint should be 87.5% +/- 1%.

OR Examinee correctly interpolated from points given on the graph that maximum power and RPS linear power trip setpoint should be 87.5% +/-

1%.

N/A SAT UNSAT

5. Determine that the CBOT calculation for maximum power and RPS linear power trip setpoint is correct and sign 1015.016B reviewed by blank.

Examinee determined the maximum power and RPS linear power trip setpoint calculated by CBOT to be correct and signed 1015.016B reviewed by blank.

N/A SAT UNSAT EXAMINER's NOTE: Examinee may discuss the Tech Spec applicability at this point stating that Tech Spec 3.7.1.1 LCO to allows power operations to continue provided that within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> power is reduced to the maximum power of 79% or as allowed by figure 3.7-1 and within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, the RPS trip setpoint adjusted to be less than the value of 79% or as allowed in figure 3.7-1 per table 3.7-1, but this discussion is not required for successful completion of the JPM.

END

TUOI: ANO-2-JPM-NRC-MSSVINOP Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

  • The plant is at 80% power, 325 EFPD, Steady State.
  • Plant refueling outage is expected to start in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
  • 2P-4B, 'B' SW pump, is out of service for repacking.
  • TSI, Turbine Supervisory Instrumentation is DISABLED to work on MTG vibration probe.
  • MSSV testing is in progress.
  • The CBOT has completed the Shift Turnover checklist.
  • All other systems are aligned in normal Mode 1 configuration.

INITIATING CUE:

As oncoming CRS, based on initial conditions, verify the shift turnover checklist for correctness.

TUOI: ANO-2-JPM-NRC-MSSVINOP Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

  • The plant is at 80% power, 325 EFPD, Steady State.
  • Plant refueling outage is expected to start in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
  • 2P-4B, 'B' SW pump, is out of service for repacking.
  • TSI, Turbine Supervisory Instrumentation is DISABLED to work on MTG vibration probe.
  • MSSV testing is in progress.
  • The CBOT has completed the Shift Turnover checklist.
  • All other systems are aligned in normal Mode 1 configuration.

INITIATING CUE:

As oncoming CRS, based on initial conditions, verify the shift turnover checklist for correctness.

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 1 OF 13 INSTRUCTIONS:

1.0 CIRCLE YES, NO OR N/A FOR EACH ITEM IN ANY DESIRED ORDER.

2.0 N/A ITEMS NOT APPLICABLE DUE TO MODE OR BEING ALIGNED TO OTHER TRAIN.

3.0 IF NO IS CIRCLED, THEN EXPLAIN IN THE REMARKS SECTION.

4.0 IF NO IS CIRCLED ON A TECH SPEC (TS) REQUIRED COMPONENT, THEN REFER TO ASSOCIATED TECH SPEC ACTION STATEMENT AND NOTIFY OPPOSITE UNIT, AS APPLICABLE.

Mode:

1 Date:

current Time:

current A.

SDBCS ALIGNMENT (2C02) 1.

2CV-1002 (A S/G Upstream ADV Isol) closed YES NO 2.

2CV-1052 (B S/G Upstream ADV Isol) closed YES NO 3.

2CV-1001 (Upstream ADV) closed, HIC in Manual, permissive in Off YES NO 4.

2CV-1051 (Upstream ADV) closed, HIC in Manual, permissive in Off YES NO 5.

2CV-0301 (DDV) closed, HIC in Auto and permissive HS in Auto YES NO 6.

2CV-0305 (DDV) closed, HIC in Auto and permissive HS in Auto YES NO 7.

2CV-0302 (Bypass Vlv) closed, HIC in Auto, permissive HS in Auto YES NO 8.

2CV-0303 (Bypass Vlv) closed, HIC in Auto, permissive HS in Auto YES NO 9.

2CV-0306 (Bypass Vlv) closed, HIC in Auto, permissive HS in Auto YES NO B.

SHUTDOWN COOLING (2C04)

Two independent ECCS subsytems required operable in Mode 1, 2 & 3 with PZR pressure 1700 psia.

(TS 3.5.2) 1.

2CV-5091 (LPSI Disch Header) open.

YES NO N/A 2.

2HS-5091 in ESF with the key removed.

YES NO N/A 3.

2FIC-5091 (LPSI Disch Hdr Flow) in Auto & set at ~ 2400 gpm.

YES NO N/A

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 2 OF 13 C.

BORATION WATER SOURCES Each of the following borated water sources shall be operable: BAMT(s)

IAW 2104.003 Supplement 4 Figure 1 (TRM 3.1.2.8) and RWT. (TRM 3.1.2.8) 1.

BAM Tanks 2T-6A and/or 2T-6B in the acceptable region of 2104.003 Supplement 4 Figure 1 YES NO 2.

Boric Acid Tank (2T-6A) Temperature > 55°F YES NO 3.

Boric Acid Tank (2T-6B) Temperature > 55°F YES NO 4.

RWT Level 92% to 99%

YES NO 5.

RWT Boron Concentration 2500 to 3000 ppm YES NO 6.

RWT Temperature 47 to 110°F (CR-2-00-687)

YES NO Are required operable boron water sources available?

YES NO

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 3 OF 13 D.

BORATION FLOW PATHS AND COMPONENTS (2C09 AND 2C33)

At least two charging pumps required operable. (TRM 3.1.2.4)

At least one charging pump in the Boron Injection Flow Path required operable. (TRM 3.1.2.2) 1.

2P-36A, associated room cooler, and room cooler SW valve operable.

YES NO 2.

2P-36B, associated room cooler, and room cooler SW valve operable.

YES NO 3.

2P-36C, associated room cooler and room cooler SW valve operable all powered from the same train (RED or GREEN).

YES NO 4.

Boric Acid Pump (2P-39A) operable.

YES NO 5.

Boric Acid Pump (2P-39B) operable.

YES NO 6.

2CV-4916-2 (Emergency Borate) operable YES NO 7.

2CV-4920-1 (Gravity Feed) operable.

YES NO 8.

2CV-4921-1 (Gravity Feed) operable.

YES NO 9.

2CV-4950-2 (RWT to CCP suction) operable.

YES NO 10.

2CV-4873-1 (VCT Outlet ) operable YES NO Circle Paths/component(s) for which credit taken (TRM 3.1.2.2)

ONE BAMT meets Volume Requirements - 2 of 3 paths required:

  • One flow path from the appropriate BAM tank via a BAM pump and a Charging pump.
  • One flow path from the appropriate BAM tank via Gravity Feed connection and Charging pump.
  • One flow path from the RWT via a Charging pump.

BOTH BAMTs needed to meet Volume Requirements - 4 of 5 paths required:

  • One flow path from BAM tank A via a BAM pump and a Charging pump.
  • One flow path from BAM tank B via a BAM pump and a Charging pump.
  • One flow path from BAM tank A via Gravity Feed connection and Charging pump.
  • One flow path from BAM tank B via Gravity Feed connection and Charging pump.

One flow path from the RWT tank via a Charging pump.

Are required boron injection flow paths operable for the operable boron water source? (TRM 3.1.2.2)

YES NO Are at least two charging pumps operable, one on each train?

(TRM 3.1.2.4)

YES NO

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 4 OF 13 E.

EMERGENCY DIESEL GENERATORS (2C33)

Two Diesel Generators are required operable. (TS 3.8.1.1) 1.

2DG1 Trouble/Not Available alarms clear YES NO 2.

2HS-2809-1 (Engine Start) in Normal After Stop YES NO 3.

2DG2 Trouble/Not Available alarms clear YES NO 4.

2HS-2829-2 (Engine Start) in Normal After Stop YES NO Are both EDGs operable?

YES NO F.

AC ELECTRICAL SYSTEMS (2C10, 2C33 AND SPDS)

Two independent circuits between offsite transmission network and onsite ESF buses shall be operable.

(TS 3.8.1.1)

SU2 HS may be in PTL with breaker available.

1.

Circle Operable Circuits RED GREEN SU2 SU3 SU2 SU3 2A1 2A1 2A2 2A2 2A3 2A3 2A4 2A4 Are two physically independent circuits between the offsite transmission network and onsite ESF buses operable?

YES NO Both trains of ESF Electrical buses shall be operable & energized with tie breakers open between redundant buses.

(TS 3.8.2.1) 2RS1, 2, 3 & 4 are required to be operable.

(TS 3.8.2.1) 2.

Circle Operable Circuits RED GREEN 2A3 2A4 2B5 2B6 2B51 2B61 2B52 2B62 2B53 2B63 2B54 2B64 2RS1 ~ 120V on SPDS (Note) 2RS2 ~ 120V on SPDS (Note) 2RS3 ~ 120V on SPDS (Note) 2RS4 ~ 120V on SPDS (Note) 2RS1 inverter trouble 2RS2 inverter trouble alarm clear alarm clear 2RS3 inverter trouble 2RS4 inverter trouble alarm clear alarm clear 2A-310 IN PTL 2A-410 IN PTL 2B-513 IN PTL 2B-613 IN PTL Are both ESF electrical trains operable and energized with tie breakers open between redundant buses?

YES NO Note: If a swing inverter is in service, then verify RS Panel voltage

~ 120V on SPDS using computer point E2RS1RS3 or E2RS2RS4.

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 5 OF 13 G.

DC ELECTRICAL SYSTEMS (2C10, 2C33 AND SPDS)

Both trains of DC electrical sources shall be operable with each train consisting of a 125 VDC bus, a battery bank & a full capacity charger. (TS 3.8.2.3)

DC Buses are verified operable by checking corresponding Undervoltage, Not Available, and Trouble alarms clear and bus voltage normal (~130V) on SPDS.

Circle Operable Trains RED GREEN 2DO1 2D02 2D11 2D12 2D31A OR 2D31B 2D32A OR 2D32B Are both trains of DC electrical sources operable?

YES NO H.

CONTROL ROOM EMERGENCY AIR CONDITIONING AND VENTILATION SYSTEMS (2C33, C19 AND LOCAL)

Two independent Control Room Emergency Air Conditioning and Air Filtration Systems are required operable.

(Unit 2 TS 3.3.3.1, Table 3.3-6, 3.7.6.1 and TRM 3.3.3.7 and Unit 1 TS 3.5.1.13, Table 3.5.1-1, 3.9.1, 3.9.2 and TRM 3.5.1) 1.

2VSF-9 operable and handswitch in AUTO.

YES NO 2.

2VE-1A and 2VUC-27A operable.

YES NO 3.

2VE-1B and 2VUC-27B operable.

YES NO 4.

At least one Control Room Rad Monitor (2RITS-8750-1A or 2RITS-8750-1B) operable and indicating between minimum and maximum values from OPS B-28 and OPS B-43.

(TS 3.3.3.1)

YES NO 5.

Both 2DG1 and 2DG2 operable YES NO 6.

ESF Buses separated (NOT cross-tied)

YES NO 7.

Chlorine Monitors operable (Unit 2 TRM 3.3.3.7, Unit 1 TRM 3.5.1)

YES NO 8.

VSF-9 operable and handswitch in Auto.

YES NO 9.

VSF-9 aligned to operable EDG power source.

YES NO 10.

At least one Unit One CR Rad Monitor operable.

(2RITS-8001A or 2RITS-8001B)

YES NO Are required CR Emergency Air Conditioning and Filtration Systems operable?

YES NO If NO is circled, then notify Unit 1 of equipment status and refer to Tech Specs.

11.

Control Room Emergency AC units (2VUC-27A & 2VUC-27B) drain loop seals (2SG-8600A and 2SG-8600B) indicate > 1.5 H2O above bottom of sightglass?

Add water at 1.5 H2O Initiate Condition Report at 1 H2O

[ER002956E202, CR-ANO-C-2001-0175]

YES NO

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 6 OF 13 I.

EMERGENCY FEEDWATER Two EFW pumps and associated flow paths are required operable in Mode 1, 2 & 3. (TS 3.7.1.2) All valves except 2CV-0707 and 2CV-1532-1 must be energized. 2CV-0711-2 (2P-7A Suction from SW)/2CV-0716-1 (2P-7B Suction from SW) checked OPEN or OPERABLE is required for surveillance action if SW is supply to EFW (TS 4.7.1.3.2) 2C33 1.

2CV-0707 - Heaters removed, valve open. Check open by either remote or local position indication.

YES NO N/A 2.

2EFW-0706 (SU/BD Demin Effluent to EFW) closed when > 10%.

YES NO N/A 2C17 3.

2CV-1000-1 (Main Steam to EFWP Turbine 2K-3) open.

YES NO N/A 4.

2CV-1038-2 (2P-7B Discharge to S/G A) open.

YES NO N/A 5.

2CV-1036-2 (2P-7B Discharge to S/G B) open.

YES NO N/A 6.

2CV-1025-1 (2P-7B Flow Control to S/G A) closed.

YES NO N/A 7.

2CV-1075-1 (2P-7B Flow Control to S/G B) closed.

YES NO N/A 8.

2CV-0716-1 (2P-7B Suction From SW) closed.

YES NO N/A 9.

2CV-0789-1 (2P-7B Suction From CST) open.

YES NO N/A 10.

EFW Pump 2P-7B operable.

YES NO N/A 11.

EFW Pump 2P-7B Room Cooler 2VUC-6B operable. (CR-ANO-2-2000-0109)

YES NO N/A 12.

EFW Pump 2P-7B Room Cooler 2VUC-6B SW MOV 2CV-1532-1 operable OR de-energized open. (CR-ANO-2-2000-0109)

YES NO N/A 2C16 13.

2CV-1050-2 (Main Steam to EFWP Turbine 2K-3) open.

YES NO N/A 14.

2CV-1026-2 (2P-7A Discharge to S/G A) closed.

YES NO N/A 15.

2CV-1076-2 (2P-7A Discharge to S/G B) closed.

YES NO N/A 16.

2CV-1037-1 (2P-7A Discharge to S/G A) open.

YES NO N/A 17.

2CV-1039-1 (2P-7A Discharge to S/G B) open.

YES NO N/A 18.

2CV-0340-2 (Steam to EFWP Turbine 2K-3) closed.

YES NO N/A 19.

2CV-0711-2 (2P-7A Suction from SW) closed.

YES NO N/A 20.

2CV-0795-2 (2P-7A Suction from CST) open.

YES NO N/A Are required EFW pumps and associated flow paths operable?

YES NO N/A

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 7 OF 13 J.

CONTAINMENT PENETRATION ROOM EXHAUST VENTILATION Maintain either 2VEF-38A or 2VEF-38B in PTL to prevent both fans from auto starting on CIAS (CR-2-93-0061).

Circle Fan Status 2VEF-38A:

AUTO PTL 2VEF-38B:

AUTO PTL 1.

Is ONE Penetration Room Exhaust Fan in AUTO and ONE in PTL?

YES NO K.

CONTAINMENT COOLING SYSTEM Two independent Containment Cooling groups are required operable (TS 3.6.2.3), both fans in a group are required for that group to be operable.

Valves must be energized.

2C17 1.

CNTMT Cooling Fan 2VSF-1B operable.

YES NO 2.

2CV-1519-1 (2VSF-1A/1B SW Outlet) closed.

YES NO 3.

2CV-1511-1 (2VSF-1A/B SW Inlet) closed.

YES NO 4.

2SV-1511-1 (SW Bypass for 2CV-1511-1) open.

YES NO 5.

CNTMT Cooling Fan 2VSF-1A operable.

YES NO 2C16 6.

CNTMT Cooling Fan 2VSF-1D operable.

YES NO 7.

2CV-1513-2 (2VSF-1C/D SW Outlet) closed.

YES NO 8.

2CV-1510-2 (2VSF-1C/D SW Inlet) closed.

YES NO 9.

2SV-1510-2 (SW Bypass for 2CV-1510-2) open.

YES NO 10.

CNTMT Cooling Fan 2VSF-1C operable.

YES NO Are required Containment Cooling groups operable?

YES NO

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 8 OF 13 L.

SAFETY INJECTION TANKS SIT isolation valves are required to be open in Mode 1, 2 & 3 with PZR pressure 700 psia (TS 4.5.1.a.2) 2C17 1.

2CV-5003-1 (SIT 2T-2A Outlet) locked open, key removed.

YES NO N/A 2.

2CV-5023-1 (SIT 2T-2B Outlet) locked open, key removed.

YES NO N/A 2C16 3.

2CV-5043-2 (SIT 2T-2C Outlet) locked open, key removed.

YES NO N/A 4.

2CV-5063-2 (SIT 2T-2D Outlet) locked open, key removed.

YES NO N/A Are all required SIT outlet valves open?

YES NO N/A M.

LOW PRESSURE SAFETY INJECTION Two independent ECCS subsystems are required in Mode 1, 2 & 3 with PZR pressure 1700 psia (TS 3.5.2) Valves Must Be Energized 2C17 1.

2CV-5017-1 (LPSI to 2P-32A Loop) closed.

YES NO N/A 2.

LPSI Pump 2P-60A operable.

YES NO N/A 3.

2CV-5037-1 (LPSI to 2P-32B Loop) closed.

YES NO N/A 2C16 4.

2CV-5057-2 (LPSI to 2P-32C Loop) closed.

YES NO N/A 5.

LPSI Pump 2P-60B operable.

YES NO N/A 6.

2CV-5077-2 (LPSI to 2P-32D Loop) closed.

YES NO N/A Are required ECCS subsystems (LPSI) operable?

YES NO N/A

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 9 OF 13 N.

HIGH PRESSURE SAFETY INJECTION Two independent ECCS subsystems are required in Modes 1, 2 & 3 with PZR pressure 1700 psia (TS 3.5.2). One ECCS subsystem is required in Modes 3 & 4 with PZR pressure < 1700 psia (TS 3.5.3).

Valves must be energized except 2CV-5101-1 and 2CV-5102-2.

2C17 1.

2CV-5630-1 (RWT 2T-3 Outlet) open YES NO N/A 2.

2CV-5101-1 (HPSI HDR #1 Hot Leg Injection) closed YES NO N/A 3.

2CV-5015-1 (HPSI HDR #1 to 2P-32A Loop) closed YES NO N/A 4.

2CV-5035-1 (HPSI HDR #1 to 2P-32B Loop) closed YES NO N/A 5.

2CV-5055-1 (HPSI HDR #1 to 2P-32C Loop) closed YES NO N/A 6.

2CV-5075-1 (HPSI HDR #1 to 2P-32D Loop) closed YES NO N/A 7.

2P-89C operable if aligned to A header (If not required for auto start, then HS in PTL.)

YES NO N/A 8.

2P-89A operable (If not required for auto start, then HS in PTL.)

YES NO N/A 9.

2CV-5647-1 (CNTMT Sump Suction Isol) locked open, key removed)

YES NO N/A 10.

2CV-5649-1 (CNTMT Sump Suction Isol) closed YES NO N/A 2C16 11.

2CV-5631-2 (RWT 2T-3 outlet) open YES NO N/A 12.

2CV-5102-2 (HPSI HDR #2 Hot Leg Injection) closed YES NO N/A 13.

2CV-5016-2 (HPSI HDR #2 to 2P-32A Loop) closed YES NO N/A 14.

2CV-5036-2 (HPSI HDR #2 to 2P-32B Loop) closed YES NO N/A 15.

2CV-5056-2 (HPSI HDR #2 to 2P-32C Loop) closed YES NO N/A 16.

2CV-5076-2 (HPSI HDR #2 to 2P-32D Loop) closed YES NO N/A 17.

2P-89C operable if aligned to B header (If not required for auto start, then HS in PTL.)

YES NO N/A 18.

2P-89B operable (If not required for auto start, then HS in PTL.)

YES NO N/A 19.

2CV-5648-2 (CNTMT Sump Suction Isol) locked open, key removed YES NO N/A 20.

2CV-5650-2 (CNTMT Sump Suction Isol) closed YES NO N/A Are required ECCS (HPSI) subsystems operable?

YES NO

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 10 OF 13 O.

SERVICE WATER (2C16 AND 2C17)

Two independent SW loops are required operable (TS 3.7.3.1)

Valves Must Be Energized 2C17 1.

2CV-1453-1 (SDC HX 2E-35A SW Inlet) closed YES NO 2.

SW Pump 2P-4B - Disconnect closed if aligned to Loop 1 YES NO N/A 1 3.

SW Pump 2P-4B powered from RED train and operable YES NO N/A 4.

SW Pump 2P-4A operable YES NO 5.

2CV-1400-1 (SW ESF Header Isol) open YES NO 6.

2CV-1541-1 (SW Return to ECP) closed YES NO 2C16 7.

2CV-1456-2 (SDC HX 2E-35B SW Inlet) closed YES NO 8.

SW Pump 2P-4B - Disconnect closed if aligned to Loop 2 YES NO N/A 9.

SW Pump 2P-4B powered from GREEN train and operable.

YES NO N/A 10.

SW Pump 2P-4C operable YES NO 11.

2CV-1406-2 (SW ESF Header Isol) open YES NO 12.

2CV-1560-2 (SW Return to ECP) closed YES NO Are required SW pumps and loops operable?

YES NO P.

ESF PUMP RECIRCS Two independent ECCS subsystems are required operable in Mode 1, 2 & 3 with PZR pressure > 1700 psia (TS 3.5.2).

One ECCS subsystem is required operable in Modes 3 & 4 with PZR pressure < 1700 psia (TS 3.5.3).

Valves must be energized.

1.

2CV-5123-1 (LPSI 2P-60A Recirc Isol) open YES NO N/A 2.

2CV-5673-1 (CNTMT Spray 2P-35A Recirc Isol) open YES NO N/A 3.

2CV-5124-1 (LPSI 2P-60B Recirc Isol) open YES NO N/A 4.

2CV-5672-1 (CNTMT Spray 2P-35B Recirc Isol) open YES NO N/A 5.

2CV-5126-1 (HPSI 2P-89A Recirc Isol) open YES NO N/A 6.

2CV-5128-1 (HPSI 2P-89B Recirc Isol) open YES NO N/A 7.

2CV-5127-1 (HPSI 2P-89C Recirc Isol) open YES NO N/A 8.

2CV-5628-2 (ESF Mini-Recirc Header Isol) open YES NO N/A Are required ESF recirc valves open?

YES NO

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 11 OF 13 Q.

CONTAINMENT SPRAY SYSTEM Two independent Containment Spray Systems are required operable in Modes 1, 2 & 3 (TS 3.6.2.1)

Valves Must Be Energized 2C17 1.

2CV-5612-1 (CNTMT Spray Header Isol) closed YES NO N/A 2.

CNTMT Spray Pump 2P-35A operable YES NO N/A 3.

2CV-5647-1 (CNTMT Sump Suction Isol) locked open, key removed YES NO N/A 4.

2CV-5649-1 (CNTMT Sump Suction Isol) closed YES NO N/A 2C16 5.

2CV-5613-2 (CNTMT Spray Header Isol) closed YES NO N/A 6.

CNTMT Spray Pump 2P-35B operable YES NO N/A 7.

2CV-5648-2 (CNTMT Sump Suction Isol) locked open, key removed YES NO N/A 8.

2CV-5650-2 (CNTMT Sump Suction Isol) closed YES NO N/A Are required Spray Systems operable?

YES NO N/A R.

CONTAINMENT FIREWATER (2C16)

Containment penetration firewater system is required operable. (Fire Spec 9D.3, 1000.152) Valve Must Be Energized.

1.

2CV-3200-2 (CNTMT Firewater Isol) closed YES NO

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 12 OF 13 S.

HIGH POINT VENTS (2C336-1 AND 2C336-2)

Position verification per NUREG-0737 Item II.B.1 1.

2HS-4671-1 (High Point Vents Control Power) On YES NO 2.

2SV-4668-1 (Rx Head Vent) Closed YES NO 3.

2SV-4636-1 (Pressurizer Vent) Closed YES NO 4.

2SV-4669-1 (Vent to Quench Tank) Closed YES NO 5.

2HS-4671-2 (High Point Vents Control Power) On YES NO 6.

2SV-4668-2 (Rx Head Vent) Closed YES NO 7.

2SV-4636-2 (Pressurizer Vent) Closed YES NO 8.

2SV-4670-2 (Vent to CNTMT Atmosphere) Closed YES NO T.

FUSE BLOCKS 1.

2C16 Fuse blocks (2) - Fuses not blown.

YES NO 2.

2C17 Fuse blocks (2) - Fuses not blown.

YES NO 3.

2C33-1 Fuse blocks (1) - Fuses not blown.

YES NO 4.

2C33-2 Fuse blocks (1) - Fuses not blown.

YES NO U.

ANNUNCIATORS 1.

Annunciator test for all Control Room Annunciators completed?.

YES NO 2.

Alarms acknowledged on all reflash units 2C10(1); 2C11(1); 2C14(5); 2C16(1); 2C17(1); 2C32(1);

2C33(3)

YES NO 3.

All annunciator disabling toggle switches ON (UP)?

YES NO V.

FIRE BRIGADE 1.

Qualified Fire Brigade assigned?

YES NO

form title:

form no.

change no.

SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B

24-01-0 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 13 OF 13 W.

MAIN STEAM AND MAIN FEEDWATER 1.

IF MSSV(s) inoperable, THEN perform the following:

A. Refer to 1015.016Q (MTC vs EFPD AND POWER) to obtain limiting MTC value B. Refer to Tech Spec Figure 3.7-1 (Maximum High Linear Power Level and Trip Setpoint Versus MTC) and use MTC value obtained from 1015.016Q to obtain High Linear Power Level Trip Setpoint for 1 MSSV inoperable or 1 MSSV/header inoperable.

ST 2 2.

IF a component required for MFW isolation becomes inoperable (i.e., a Condensate, MFW, or Heater Drain pump will not trip on MSIS or CSAS),

THEN restore the component within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or place it in its MSIS or CSAS actuated state.

Otherwise be in Hot Standby in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

NA COMMENTS:

1 'B' Service water pump is out of service for repacking.

2 2PSV-1054 is inoperable; Maximum High Linear Power level and Trip Setpoint determined to be 87.5%.

If position manned, then list on shift personnel:

SM Sam Manager CRS Charlie Supervisor CRSA NA TRO NA CBOR Robert Reactor CBOT Sam Turbine WCO William Operator AO Art Jones EOP Eddie Plant SE Emil Engineer PERFORMED BY: Sam Turbine REVIEWED BY: ___________________________________________________________________

TUOI: ANO-2-JPM-NRC-KEY Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:

2 REV #:

000 DATE:

SYSTEM/DUTY AREA:

Conduct of Operations (A.1)

TASK:

Determine requirements for issuing Containment air lock access key.

JTA#:

KA VALUE RO:

2.0 SRO:

2.9 KA

REFERENCE:

2.1.13 APPROVED FOR ADMINISTRATION TO:

RO:

SRO:

X TASK LOCATION:

INSIDE CR:

OUTSIDE CR:

BOTH:

X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

SIMULATOR:

Perform CLASSROOM:

Perform POSITION EVALUATED:

RO:

SRO:

ACTUAL TESTING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

CLASSROOM:

TESTING METHOD:

SIMULATE:

PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES:

20 Minutes REFERENCE(S):

1015.005A, Shift Managers Key Log, 1015.005, Operations Key Control and Unit 2 Tech Specs.

EXAMINEE'S NAME:

SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED:

DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

TUOI: ANO-2-JPM-NRC-KEY Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

  • The plant is at 100% power.
  • Green train maintenance week; minimal risk.
  • Containment Personnel Hatch is locked.
  • Containment Personnel Hatch was last closed on July 5, 2001 at 1900 with all required surveillances completed.
  • Irvin Calibrate is ready to enter the Unit 2 Containment Building. Access is required for on-line surveillance testing. This testing will continue for the next three days under MAI
  1. 57449 on 'B' SIT instrumentation on 386' elevation.
  • Radiation Protection requirements have been completed and HP, Roger Health, badge number 3432, is requesting key for entry to Containment Personnel Hatch (#298).

TASK STANDARD: Determine the following requirements for issuance of the Containment Personnel Hatch key:

Status board entry for Containment Personnel Hatch LLRT due.

Status board entry for Containment visual inspection per form 1015.016M is required daily, and when entry complete and prior to LLRT on Containment Personnel Hatch.

Inform NP&S to enter requirements onto daily and surveillance schedule.

Ensure daily visual inspection of areas affected and final inspection at completion of entry is performed using form 1015.016M and a station log entry is performed to satisfy Tech Spec 4.5.2.C.2.

Ensure that during the first entry Tech Spec 4.6.1.3.2 required surveillance on the Containment Personnel Hatch door interlock (task 020626) is performed.

Obtain Name, Badge number and signature of person receiving the key.

TASK PERFORMANCE AIDS: OP 1015.005A, Shift Manager's Key Log and 1015.005, Operations Key Control and Unit 2 Tech Spec's.

TUOI: ANO-2-JPM-NRC-KEY Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

Determine the requirements for issuance of the Containment Personnel Hatch access key and Containment Building entry and complete required form to issue key per 1015.005, Operations Key Control.

CRITICAL ELEMENTS (C) 3, 5, 6 PERFORMANCE CHECKLIST STANDARD (Circle One)

1. Review OP 1015.005, Operations Key Control to determine requirements.

Examinee reviewed steps 6.1 and 6.5 of 1015.005 to determine requirements for issuing key.

N/A SAT UNSAT EXAMINER'S NOTE: If candidate asks, report that I&C is entering Containment immediately after the issuance of the key and the requirements after entry are applicable. HP is the person receiving the Key.

2. Using 1015.005 log key number, Individual's name, individual's badge number, MAI number, SM name, Date/Time key issued to Containment Personnel Hatch.

Examinee obtained key number(298), name (Roger Health), badge number (3432),

MAI number (57449) and signature of person receiving the key from initial conditions.

Examinee signed and dated with the time that key was issued.

N/A SAT UNSAT (C)

3. Using 1015.005 determine status board entry requirements.

EXAMINER'sCUE:

If asked, HES-02 requires LLRT within 7 days of completion of this maintenance.

Examinee determined Status board entry:

  • Containment Personnel Hatch LLRT due
  • Containment visual inspection per form 1015.016M.

N/A SAT UNSAT

4. Using 1015.005 determine need to inform NP&S to enter requirements onto daily and surveillance schedule.

Examinee contacted or discussed requirement to inform NP&S to enter requirements onto daily and surveillance schedule.

N/A SAT UNSAT

TUOI: ANO-2-JPM-NRC-KEY Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)

(C)

5. Using 1015.005 determine need to satisfy Tech Spec 4.5.2.C.2 surveillance requirements for containment entry.

Examinee determined a required daily visual inspection of areas affected using form 1015.016M along with a station log entry and a required final inspection at the completion of entry using form 1015.016M and a station log entry.

N/A SAT UNSAT (C)

6. Using 1015.005 determine need satisfy Tech Spec 4.6.1.3.2 surveillance requirements for containment entry.

Examinee determined surveillance on the Containment Personnel Hatch door interlock (task 020626) on initial entry needed to satisfy 4.6.1.3.2 surveillance requirements.

N/A SAT UNSAT EXAMINER's NOTE: If asked about mechanical support for Containment Personnel Hatch door interlock surveillance, report that mechanics are standing by the personnel hatch ready to perform surveillance on the initial entry into containment building.

END

TUOI: ANO-2-JPM-NRC-KEY Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

  • The plant is at 100% power.
  • Green train maintenance week; minimal risk.
  • Containment Personnel Hatch is locked.
  • Containment Personnel Hatch was last closed on July 5, 2001 at 1900 with all required surveillances completed.
  • Irvin Calibrate is ready to enter the Unit 2 Containment Building. Access is required for on-line surveillance testing. This testing will continue for the next three days under MAI
  1. 57449 on 'B' SIT instrumentation on 386' elevation.
  • Radiation Protection requirements have been completed and HP, Roger Health, badge number 3432, is requesting key for entry to Containment Personnel Hatch (#298).

INITIATING CUE:

Determine the requirements for issuance of the Containment Personnel Hatch access key and Containment Building entry and complete required form to issue key per 1015.005, Operations Key Control.

TUOI: ANO-2-JPM-NRC-KEY Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

  • The plant is at 100% power.
  • Green train maintenance week; minimal risk.
  • Containment Personnel Hatch is locked.
  • Containment Personnel Hatch was last closed on July 5, 2001 at 1900 with all required surveillances completed.
  • Irvin Calibrate is ready to enter the Unit 2 Containment Building. Access is required for on-line surveillance testing. This testing will continue for the next three days under MAI
  1. 57449 on 'B' SIT instrumentation on 386' elevation.
  • Radiation Protection requirements have been completed and HP, Roger Health, badge number 3432, is requesting key for entry to Containment Personnel Hatch (#298).

INITIATING CUE:

Determine the requirements for issuance of the Containment Personnel Hatch access key and Containment Building entry and complete required form to issue key per 1015.005, Operations Key Control.

TUOI: ANO-2-JPM-NRC-KI Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:

2 REV #:

000 DATE:

SYSTEM/DUTY AREA:

Radiation Controls (A.3)

TASK:

Approve administration of Potassium Iodide.

JTA#:

KA VALUE RO:

2.9 SRO:

3.3 KA

REFERENCE:

2.3.10 APPROVED FOR ADMINISTRATION TO:

RO:

SRO:

X TASK LOCATION:

INSIDE CR:

OUTSIDE CR:

BOTH:

X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

SIMULATOR:

Perform CLASSROOM:

Perform POSITION EVALUATED:

RO:

SRO:

ACTUAL TESTING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

CLASSROOM:

TESTING METHOD:

SIMULATE:

PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES:

15 Minutes REFERENCE(S):

1903.035, Administration of Potassium Iodide EXAMINEE'S NAME:

SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED:

DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

TUOI: ANO-2-JPM-NRC-KI Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

  • The plant is tripped from 100% power.
  • 300 gpm LOCA in progress.
  • RDACS indicates an off site release in progress.
  • Data indicates I-131 concentration of 5.0 E-04 µµµµ ci/cc in area of work in Upper South Piping Penetration room.
  • Whole body dose rates in area of work are 1Rem/hr.
  • General Emergency has just been declared.
  • Joe Mechanic is standing by to perform task in Upper South Piping Penetration room.
  • RP estimates that it will take approximately 15 minutes to complete emergency actions and stop the release and all RP required controls/authorizations are complete.
  • Air Purifying Respirator with Iodine Canister having a protection factor of 1.0 will be used in place of a SCBA due to piping interference.

TASK STANDARD: Determine that KI should be administered.

TASK PERFORMANCE AIDS: OP 1903.0035, Potassium Iodide Administration, completed form 1903.035C, ANO Medical Questionnaire-Iodine Sensitivity and 1903.035A, Potassium Iodide Administration.

TUOI: ANO-2-JPM-NRC-KI Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

Determine the need to issue KI, Potassium Iodide and complete necessary paperwork, using OP 1903.035.

CRITICAL ELEMENTS (C) 2, 3, 5 PERFORMANCE CHECKLIST STANDARD (Circle One)

1. Review OP 1903.035, Administration of Potassium Iodide to determine criteria for administering KI.

Examinee determined the criteria for administration of KI is 25 REM exposure to Thyroid committed dose equivalent or if concentration is unknown, the possibility exists for receiving large amounts of radioactive airborne iodine.

N/A SAT UNSAT (C)

2. Using graph on 1903.035 and information provided in initial conditions, determine that Joe Mechanic will exceed 25 REM during the maintenance evolution.

Determined that expected exposure will exceed 25 REM threshold.

N/A SAT UNSAT (C)

3. Determine that Joe Mechanic is not sensitive to nor experienced an allergic reaction to Iodide.

EXAMINER's CUE: Give examinee completed 1903.035C form.

Ask Joe Mechanic for completed 1903.035C form and determined that Joe Mechanic was not sensitive to nor experienced an allergic reaction to Iodide.

N/A SAT UNSAT

TUOI: ANO-2-JPM-NRC-KI Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)

4. Complete form 1903.035A.

Completed all areas of form 1903.035A, Potassium Iodide Administration, from initial conditions:

  • Estimated Thyroid dose commitment.
  • Date.
  • Respiratory protection.
  • Signature of Joe Mechanic that he chooses to receive KI.

N/A SAT UNSAT (C)

5. Determine that KI may be approved for distribution to Joe Mechanic during the Upper South Piping penetration room work.

Examinee approved distribution of KI to Joe Mechanic by signing and dating form.

N/A SAT UNSAT END

TUOI: ANO-2-JPM-NRC-KI Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

  • The plant is tripped from 100% power.
  • 300 gpm LOCA in progress.
  • RDACS indicates an off site release in progress.
  • Data indicates I-131 concentration of 5.0 E-04 µµµµ ci/cc in area of work in Upper South Piping Penetration room.
  • Whole body dose rates in area of work are 1Rem/hr.
  • General Emergency has just been declared.
  • Joe Mechanic is standing by to perform task in Upper South Piping Penetration room.
  • RP estimates that it will take approximately 15 minutes to complete emergency actions and stop the release and all RP required controls/authorizations are complete.
  • Air Purifying Respirator with Iodine Canister having a protection factor of 1.0 will be used in place of a SCBA due to piping interference.

INITIATING CUE:

Determine the need to issue KI, Potassium Iodide and complete necessary paperwork, using OP 1903.035.

TUOI: ANO-2-JPM-NRC-KI Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

  • The plant is tripped from 100% power.
  • 300 gpm LOCA in progress.
  • RDACS indicates an off site release in progress.
  • Data indicates I-131 concentration of 5.0 E-04 µµµµ ci/cc in area of work in Upper South Piping Penetration room.
  • Whole body dose rates in area of work are 1Rem/hr.
  • General Emergency has just been declared.
  • Joe Mechanic is standing by to perform task in Upper South Piping Penetration room.
  • RP estimates that it will take approximately 15 minutes to complete emergency actions and stop the release and all RP required controls/authorizations are complete.
  • Air Purifying Respirator with Iodine Canister having a protection factor of 1.0 will be used in place of a SCBA due to piping interference.

INITIATING CUE:

Determine the need to issue KI, Potassium Iodide and complete necessary paperwork, using OP 1903.035.