IR 05000528/2019001: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:April 30, 2019 | ||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 29: | Line 29: | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Neil F. OKeefe, Chief Project Branch D Division of Reactor Projects Docket Nos. 05000528, 05000529, 05000530, and 07200044 License Nos. NPF-41, NPF-51, NPF-74 Enclosure: | |||
Neil F. OKeefe, Chief Project Branch D Division of Reactor Projects | |||
Docket Nos. 05000528, 05000529, 05000530, and 07200044 | |||
License Nos. NPF-41, NPF-51, NPF-74 | |||
Enclosure: | |||
Inspection Report 05000528/2019001, 05000529/2019001, 05000530/2019001, and 07200044/2019001 w/attachments: | Inspection Report 05000528/2019001, 05000529/2019001, 05000530/2019001, and 07200044/2019001 w/attachments: | ||
1. Supplemental Information 2. Information Request | 1. Supplemental Information 2. Information Request | ||
U.S. NUCLEAR REGULATORY COMMISSION | Enclosure U.S. NUCLEAR REGULATORY COMMISSION | ||
==Inspection Report== | ==Inspection Report== | ||
Docket Number(s): 05000528, 05000529, 05000530, and 07200044 License Number(s): NPF-41, NPF-51 and NPF-74 Report Number(s): 05000528/2019001, 05000529/2019001, 05000530/2019001, and 07200044/2019001 | Docket Number(s): | ||
05000528, 05000529, 05000530, and 07200044 | |||
License Number(s): | |||
NPF-41, NPF-51 and NPF-74 | |||
Report Number(s): | |||
05000528/2019001, 05000529/2019001, 05000530/2019001, and | |||
07200044/2019001 | |||
Facility: Palo Verde Nuclear Generating Station and Independent Spent Fuel Storage Installation Location: 5801 South Wintersburg Road, Tonopah, AZ 85354 Inspection Dates: January 1, 2019, to March 31, 2019 Inspectors: C. Peabody, Senior Resident Inspector D. Reinert, Resident Inspector D. You, Resident Inspector R. Bywater, Resident Inspector R. Alexander, Senior Project Engineer L. Carson, Senior Health Physicist P. Elkmann, Senior Emergency Preparedness Inspector N. Greene, PhD, Senior Health Physicist S. Hedger, Emergency Preparedness Inspector J. O'Donnell, Health Physicist C. Alldredge, Allegations/Enforcement Specialist B. Baca, Health Physicist O. Masnyk Bailey, Health Physicist (Region I) | Enterprise Identifier: I-2019-001-0013 | ||
K. Warner, Health Physicist, (Region I) | |||
Approved By: Neil OKeefe, Chief, Project Branch D, Division of Reactor Projects | I-2019-001-0077 | ||
Licensee: | |||
Arizona Public Service Co. | |||
Facility: | |||
Palo Verde Nuclear Generating Station and Independent Spent Fuel | |||
Storage Installation | |||
Location: | |||
5801 South Wintersburg Road, Tonopah, AZ 85354 | |||
Inspection Dates: | |||
January 1, 2019, to March 31, 2019 | |||
Inspectors: | |||
C. Peabody, Senior Resident Inspector | |||
D. Reinert, Resident Inspector | |||
D. You, Resident Inspector | |||
R. Bywater, Resident Inspector | |||
R. Alexander, Senior Project Engineer | |||
L. Carson, Senior Health Physicist | |||
P. Elkmann, Senior Emergency Preparedness Inspector | |||
N. Greene, PhD, Senior Health Physicist | |||
S. Hedger, Emergency Preparedness Inspector | |||
J. O'Donnell, Health Physicist | |||
C. Alldredge, Allegations/Enforcement Specialist | |||
B. Baca, Health Physicist | |||
O. Masnyk Bailey, Health Physicist (Region I) | |||
K. Warner, Health Physicist, (Region I) | |||
Approved By: | |||
Neil OKeefe, Chief, | |||
Project Branch D, | |||
Division of Reactor Projects | |||
=SUMMARY= | =SUMMARY= | ||
| Line 48: | Line 111: | ||
NRC-identified and self-revealed findings, violations, and additional items are summarized in the table below. Licensee-identified non-cited violations are documented in the Inspection Results at the end of this report. | NRC-identified and self-revealed findings, violations, and additional items are summarized in the table below. Licensee-identified non-cited violations are documented in the Inspection Results at the end of this report. | ||
List of Findings and Violations No findings were identified. | ===List of Findings and Violations=== | ||
No findings were identified. | |||
Additional Tracking Items None. | ===Additional Tracking Items=== | ||
None. | |||
=PLANT STATUS= | =PLANT STATUS= | ||
| Line 60: | Line 125: | ||
==REACTOR SAFETY== | ==REACTOR SAFETY== | ||
==71111.01 - Adverse Weather Protection== | |||
==71111.01 - Adverse Weather Protection Seasonal Extreme Weather Sample (IP Section 03.02)== | ===Seasonal Extreme Weather Sample (IP Section 03.02) (1 Sample)=== | ||
The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of extreme high temperatures. | The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of extreme high temperatures. | ||
==71111.04 - Equipment Alignment Partial Walkdown (IP Section 02.01)== | ==71111.04 - Equipment Alignment== | ||
===Partial Walkdown (IP Section 02.01) (3 Samples)=== | |||
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains: | The inspectors evaluated system configurations during partial walkdowns of the following systems/trains: | ||
: (1) Unit 3 containment spray system B, on January 24, 2019 | : (1) Unit 3 containment spray system B, on January 24, 2019 | ||
| Line 74: | Line 136: | ||
: (3) Unit 3 loss of power sequencer A, on March 22, 2019 | : (3) Unit 3 loss of power sequencer A, on March 22, 2019 | ||
==71111.05Q - Fire Protection Quarterly Inspection (IP Section 03.01)== | ==71111.05Q - Fire Protection== | ||
===Quarterly Inspection (IP Section 03.01) (6 Samples)=== | |||
The inspectors evaluated fire protection program implementation in the following selected areas: | The inspectors evaluated fire protection program implementation in the following selected areas: | ||
: (1) Unit 3 non-class switchgear and battery rooms, Fire Area TB4, on January 16, 2019 | : (1) Unit 3 non-class switchgear and battery rooms, Fire Area TB4, on January 16, 2019 | ||
| Line 85: | Line 146: | ||
: (6) Unit 1 Class 1E switchgear B room, Fire Area 5B, on March 29, 2019 | : (6) Unit 1 Class 1E switchgear B room, Fire Area 5B, on March 29, 2019 | ||
==71111.06 - Flood Protection Measures Inspection Activities - Internal Flooding (IP Section 02.02a.)== | ==71111.06 - Flood Protection Measures== | ||
===Inspection Activities - Internal Flooding (IP Section 02.02a.) (1 Sample)=== | |||
The inspectors evaluated internal flooding mitigation protections in the 80 and 100 elevations of the Unit 1, 2, and 3 main steam support structures on March 21, 2019. | The inspectors evaluated internal flooding mitigation protections in the 80 and 100 elevations of the Unit 1, 2, and 3 main steam support structures on March 21, 2019. | ||
Inspection Activities - Underground Cables (IP Section 02.02c.) (1 Sample) | ===Inspection Activities - Underground Cables (IP Section 02.02c.) (1 Sample)=== | ||
The inspectors evaluated cable submergence protection in Unit 3 Bravo diesel fuel oil vault on March 1, 2019. | The inspectors evaluated cable submergence protection in Unit 3 Bravo diesel fuel oil vault on March 1, 2019. | ||
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) | ==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance== | ||
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample) | |||
The inspectors observed and evaluated Unit 3 control room operators during a maintenance activity to replace power switch assemblies for control element assembly 22 on February 12, 2019. | The inspectors observed and evaluated Unit 3 control room operators during a maintenance activity to replace power switch assemblies for control element assembly 22 on February 12, 2019. | ||
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample) | ===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)=== | ||
The inspectors observed and evaluated a licensed operator continuing training simulator scenario on February 5, 2019. The inspectors assessed the performance of the operators and the control room simulator. | The inspectors observed and evaluated a licensed operator continuing training simulator scenario on February 5, 2019. The inspectors assessed the performance of the operators and the control room simulator. | ||
==71111.12 - Maintenance Effectiveness Routine Maintenance Effectiveness Inspection (IP Section 02.01)== | ==71111.12 - Maintenance Effectiveness== | ||
===Routine Maintenance Effectiveness Inspection (IP Section 02.01) (2 Samples)=== | |||
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions: | The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions: | ||
: (1) Unit 1 chemical and volume control system charging pump discharge pressure relief valve failures, on January 24, 2019 | : (1) Unit 1 chemical and volume control system charging pump discharge pressure relief valve failures, on January 24, 2019 | ||
: (2) Unit 3 essential chilled water temperature control valve ECB-TV0030, on March 21, 2019 | : (2) Unit 3 essential chilled water temperature control valve ECB-TV0030, on March 21, 2019 | ||
==71111.13 - Maintenance Risk Assessments and Emergent Work Control Risk Assessment and Management Sample (IP Section 03.01)== | ==71111.13 - Maintenance Risk Assessments and Emergent Work Control== | ||
===Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)=== | |||
The inspectors evaluated the risk assessments for the following planned and emergent work activities: | The inspectors evaluated the risk assessments for the following planned and emergent work activities: | ||
: (1) Unit 2 elevated risk during station blackout generator and high pressure safety injection pump A maintenance, on January 8, 2019 | : (1) Unit 2 elevated risk during station blackout generator and high pressure safety injection pump A maintenance, on January 8, 2019 | ||
| Line 116: | Line 174: | ||
: (3) Unit 3 online risk during diesel generator A super outage, on March 5, 2019 | : (3) Unit 3 online risk during diesel generator A super outage, on March 5, 2019 | ||
==71111.15 - Operability Determinations and Functionality Assessments Sample Selection (IP Section 02.01)== | ==71111.15 - Operability Determinations and Functionality Assessments== | ||
===Sample Selection (IP Section 02.01) (6 Samples)=== | |||
The inspectors evaluated the following operability determinations and functionality assessments: | The inspectors evaluated the following operability determinations and functionality assessments: | ||
: (1) Unit 3 spent fuel pool decrease in Boron-10 concentration, on January 25, 2019 | : (1) Unit 3 spent fuel pool decrease in Boron-10 concentration, on January 25, 2019 | ||
| Line 127: | Line 184: | ||
: (6) Unit 3 pressurizer level control system tuning issues, on March 26, 2019 | : (6) Unit 3 pressurizer level control system tuning issues, on March 26, 2019 | ||
==71111.18 - Plant Modifications Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) | ==71111.18 - Plant Modifications== | ||
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples) | |||
The inspectors evaluated the following temporary or permanent modifications: | The inspectors evaluated the following temporary or permanent modifications: | ||
| Line 134: | Line 191: | ||
: (2) Station blackout generator 1 and 2 modification for permanently adjusting lube oil high pressure alarm set point, on March 20, 2019 | : (2) Station blackout generator 1 and 2 modification for permanently adjusting lube oil high pressure alarm set point, on March 20, 2019 | ||
==71111.19 - Post Maintenance Testing Post Maintenance Test Sample (IP Section 03.01)== | ==71111.19 - Post Maintenance Testing== | ||
===Post Maintenance Test Sample (IP Section 03.01) (4 Samples)=== | |||
The inspectors evaluated the following post maintenance tests: | The inspectors evaluated the following post maintenance tests: | ||
: (1) Unit 3 control element assembly power switch assembly test following replacement, on February 12, 2019 | : (1) Unit 3 control element assembly power switch assembly test following replacement, on February 12, 2019 | ||
| Line 143: | Line 199: | ||
: (4) Unit 3 safety injection valve 615 test following periodic maintenance, on March 19, 2019 | : (4) Unit 3 safety injection valve 615 test following periodic maintenance, on March 19, 2019 | ||
==71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests: | ==71111.22 - Surveillance Testing== | ||
In Service Testing (IST) (IP Section 03.01)== | The inspectors evaluated the following surveillance tests: | ||
===In Service Testing (IST) (IP Section 03.01)=== | |||
{{IP sample|IP=IP 71111.22|count=1}} | {{IP sample|IP=IP 71111.22|count=1}} | ||
77ST-9EW01, Unit 1 essential cooling water A inservice pump test, on January 31, 2019 | 77ST-9EW01, Unit 1 essential cooling water A inservice pump test, on January 31, 2019 | ||
===Surveillance Testing (IP Section 03.01) (3 Samples)=== | ===Surveillance Testing (IP Section 03.01) (3 Samples)=== | ||
: (1) Unit 3 diesel generator A 24 hour surveillance and hot restart, on January 7 | : (1) Unit 3 diesel generator A 24 hour surveillance and hot restart, on January 7, 2019 | ||
==71114.06 - Drill Evaluation Drill and/or Simulator-Based Licensed Operator Requalification Training (IP Section 02.01) | (2)77ST-9SB19, Unit 1 core protection calculator system channel C functional test, on January 8, 2019 | ||
(3)36ST-9SA02, Unit 1 engineered safety features actuation system train B subgroup relay functional testing, on February 21, 2019 | |||
==71114.06 - Drill Evaluation== | |||
Drill and/or Simulator-Based Licensed Operator Requalification Training (IP Section 02.01) | |||
===(see 71114.06 for sample guidance)=== | |||
{{IP sample|IP=IP 71114.06|count=1}} | {{IP sample|IP=IP 71114.06|count=1}} | ||
The inspectors evaluated a dress rehearsal drill that required emergency facilities to respond to a fire in a diesel generator room, a steam generator tube rupture, and a steam line break on February 5, 2019. | The inspectors evaluated a dress rehearsal drill that required emergency facilities to respond to a fire in a diesel generator room, a steam generator tube rupture, and a steam line break on February 5, 2019. | ||
==71114.08 - Exercise Evaluation Scenario Review Inspection Review (IP Section 02.01 - 02.04)== | ==71114.08 - Exercise Evaluation Scenario Review== | ||
===Inspection Review (IP Section 02.01 - 02.04) (1 Sample)=== | |||
The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on February 11, 2019. This review did not constitute approval of the scenario. | The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on February 11, 2019. This review did not constitute approval of the scenario. | ||
==RADIATION SAFETY== | ==RADIATION SAFETY== | ||
==71124.05 - Radiation Monitoring Instrumentation== | |||
==71124.05 - Radiation Monitoring Instrumentation Calibration and Testing Program (IP Section 02.02)== | ===Calibration and Testing Program (IP Section 02.02) (1 Sample)=== | ||
The inspectors evaluated the calibration and testing program implementation. | The inspectors evaluated the calibration and testing program implementation. | ||
| Line 177: | Line 236: | ||
* SAC-4 | * SAC-4 | ||
* PNR-4 | * PNR-4 | ||
* MGTM | * MGTM | ||
===Walk Downs and Observations (IP Section 02.01) (1 Sample)=== | ===Walk Downs and Observations (IP Section 02.01) (1 Sample)=== | ||
The inspectors evaluated radiation monitoring instrumentation during plant walkdowns. The inspector observed the following: | The inspectors evaluated radiation monitoring instrumentation during plant walkdowns. The inspector observed the following: | ||
Portable survey instruments: | Portable survey instruments: | ||
* BC-4 | * BC-4 | ||
| Line 186: | Line 246: | ||
* RM-20 (multiple) | * RM-20 (multiple) | ||
* FH40GL | * FH40GL | ||
* CM-11 Source check demonstration: | * CM-11 | ||
Source check demonstration: | |||
* RM-20 | * RM-20 | ||
* FH40GL | * FH40GL | ||
* SAM-12 Area radiation monitors and continuous air monitors: | * SAM-12 | ||
Area radiation monitors and continuous air monitors: | |||
* RU-1 | * RU-1 | ||
* RU-2 | * RU-2 | ||
| Line 205: | Line 269: | ||
* RU-152A | * RU-152A | ||
* RU-155D | * RU-155D | ||
* RU-158D Personnel contamination monitors, portal monitors and small article monitors: | * RU-158D | ||
Personnel contamination monitors, portal monitors and small article monitors: | |||
* iPCM-12 | * iPCM-12 | ||
* PCM-12 | * PCM-12 | ||
* SAM-12 | * SAM-12 | ||
==71124.06 - Radioactive Gaseous and Liquid Effluent Treatment Calibration and Testing Program (Process & Effluent Monitors) (IP Section 02.02) | ==71124.06 - Radioactive Gaseous and Liquid Effluent Treatment== | ||
Calibration and Testing Program (Process & Effluent Monitors) (IP Section 02.02) (1 Sample) | |||
The inspectors reviewed the following gaseous and liquid effluent monitor instrument calibrations and tests: | The inspectors reviewed the following gaseous and liquid effluent monitor instrument calibrations and tests: | ||
| Line 219: | Line 285: | ||
* RU-145, Unit 2 Fuel Building B Vent Exhaust Monitor Low Calibration | * RU-145, Unit 2 Fuel Building B Vent Exhaust Monitor Low Calibration | ||
* RU-143, Unit 3 Plant Vent Monitor Low Calibration | * RU-143, Unit 3 Plant Vent Monitor Low Calibration | ||
* RU-146, Unit 3 Fuel Building B Vent Exhaust Monitor High Calibration Dose Calculations (IP Section 02.05) (1 Sample): | * RU-146, Unit 3 Fuel Building B Vent Exhaust Monitor High Calibration | ||
Dose Calculations (IP Section 02.05) (1 Sample): | |||
The inspectors reviewed the following liquid and gaseous discharge permits to evaluate public dose calculations: | The inspectors reviewed the following liquid and gaseous discharge permits to evaluate public dose calculations: | ||
* Permit 20172058, Unit 2 Refueling Purge | * Permit 20172058, Unit 2 Refueling Purge | ||
| Line 228: | Line 297: | ||
* Permit 20191015, Unit 1 Fuel Building Vent | * Permit 20191015, Unit 1 Fuel Building Vent | ||
* Permit 20192013, Unit 2 Plant Vent | * Permit 20192013, Unit 2 Plant Vent | ||
* Permit 20192015, Unit 2 Fuel Building Vent The inspectors also reviewed the following annual radiological effluent release reports: | * Permit 20192015, Unit 2 Fuel Building Vent | ||
The inspectors also reviewed the following annual radiological effluent release reports: | |||
* 2016 Annual Radioactive Effluent Release Report | * 2016 Annual Radioactive Effluent Release Report | ||
* 2017 Annual Radioactive Effluent Release Report Abnormal gaseous or liquid tank discharges: | * 2017 Annual Radioactive Effluent Release Report | ||
* CR-2018-14265, Oily Waste Separator Tank Overflow | |||
Abnormal gaseous or liquid tank discharges: | |||
* CR-2018-14265, Oily Waste Separator Tank Overflow | |||
===Instrumentation and Equipment (IP Section 02.04) (1 Sample)=== | ===Instrumentation and Equipment (IP Section 02.04) (1 Sample)=== | ||
| Line 238: | Line 311: | ||
* STWO 4813386, Unit 2 Fuel and Aux Building Essential Air Filtration Unit | * STWO 4813386, Unit 2 Fuel and Aux Building Essential Air Filtration Unit | ||
* STWO 4836778, Unit 1 Fuel and Aux Building Essential Air Filtration Unit | * STWO 4836778, Unit 1 Fuel and Aux Building Essential Air Filtration Unit | ||
* STWO 4866355, Unit 3 Fuel and Aux Building Essential Air Filtration Unit | * STWO 4866355, Unit 3 Fuel and Aux Building Essential Air Filtration Unit | ||
===Sampling and Analysis (IP Section 02.03) (1 Sample)=== | ===Sampling and Analysis (IP Section 02.03) (1 Sample)=== | ||
| Line 244: | Line 317: | ||
* RU-145, Unit 3 Fuel Building Radiation Monitor Filter Change out and Gas Grab Sample | * RU-145, Unit 3 Fuel Building Radiation Monitor Filter Change out and Gas Grab Sample | ||
* RU-143, Unit 2 Plant Ventilation Radiation Monitor Filter Change out and Gas Grab Sample | * RU-143, Unit 2 Plant Ventilation Radiation Monitor Filter Change out and Gas Grab Sample | ||
* Unit 2 Primary to Secondary Sampling Effluent discharges: | * Unit 2 Primary to Secondary Sampling | ||
Effluent discharges: | |||
* Unit 3 Fuel Building Vent Gas Effluent Discharge Permit | * Unit 3 Fuel Building Vent Gas Effluent Discharge Permit | ||
* Unit 2 Plant Vent Gas Effluent Discharge Permit | * Unit 2 Plant Vent Gas Effluent Discharge Permit | ||
===Walk Downs and Observations (IP Section 02.01) (1 Sample)=== | ===Walk Downs and Observations (IP Section 02.01) (1 Sample)=== | ||
| Line 255: | Line 330: | ||
* Unit 3 Fuel Building Ventilation Exhaust System | * Unit 3 Fuel Building Ventilation Exhaust System | ||
==71124.07 - Radiological Environmental Monitoring Program Groundwater Protection Initiative (GPI) Implementation (IP Section 02.02)== | ==71124.07 - Radiological Environmental Monitoring Program== | ||
===Groundwater Protection Initiative (GPI) Implementation (IP Section 02.02) (1 Sample)=== | |||
The inspectors evaluated the licensee's groundwater monitoring program. | The inspectors evaluated the licensee's groundwater monitoring program. | ||
| Line 264: | Line 338: | ||
Walkdowns and calibration and maintenance record review: | Walkdowns and calibration and maintenance record review: | ||
* Air Sampling Station Site 4 The inspectors observed the following environmental sample collections and preparation: | * Air Sampling Station Site 4 | ||
The inspectors observed the following environmental sample collections and preparation: | |||
* Sites 4, 6A, 7A, 14A, 15, 17A, 21, 29, 35, and 40 | * Sites 4, 6A, 7A, 14A, 15, 17A, 21, 29, 35, and 40 | ||
* Goat milk Licensee actions in response to missed sample, inoperable sampler, lost thermoluminescent detector (TLD) or anomalous measurement: | * Goat milk Licensee actions in response to missed sample, inoperable sampler, lost thermoluminescent detector (TLD) or anomalous measurement: | ||
* Air Sample Site 6A | * Air Sample Site 6A | ||
* Milk Sample Site 53 | * Milk Sample Site 53 | ||
* TLD Site 16 Sampling program for the potential of licensed material entering groundwater | * TLD Site 16 | ||
Sampling program for the potential of licensed material entering groundwater | |||
* Reactor Water Makeup Tank | * Reactor Water Makeup Tank | ||
* Reactor Water Tank | * Reactor Water Tank | ||
| Line 275: | Line 353: | ||
* Essential Pipe Density Tunnel | * Essential Pipe Density Tunnel | ||
==71124.08 - Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Radioactive Material Storage (IP Section 02.01)== | ==71124.08 - Radioactive Solid Waste Processing and Radioactive Material Handling, Storage,== | ||
and Transportation | |||
===Radioactive Material Storage (IP Section 02.01)=== | |||
{{IP sample|IP=IP 71124.08|count=1}} | {{IP sample|IP=IP 71124.08|count=1}} | ||
The inspectors evaluated radioactive material storage in the follow areas: | The inspectors evaluated radioactive material storage in the follow areas: | ||
* Dry Active Waste Processing and Storage (DAWPS) Facility | * Dry Active Waste Processing and Storage (DAWPS) Facility | ||
* Low Level Radioactive Materials Storage Facility (LLRWSF) | * Low Level Radioactive Materials Storage Facility (LLRWSF) | ||
Container check (e.g., swelling, leakage and deformation): | Container check (e.g., swelling, leakage and deformation): | ||
* 10-4191 Main Steam Safety Valve container | * 10-4191 Main Steam Safety Valve container | ||
| Line 292: | Line 374: | ||
* 19-2-007 Intermodal Asphalt | * 19-2-007 Intermodal Asphalt | ||
* 19-2-008 Intermodal Asphalt | * 19-2-008 Intermodal Asphalt | ||
* 19-3-006 Sealand DAW Radioactive Waste System Walkdown (IP Section 02.02) (1 Sample) | * 19-3-006 Sealand DAW | ||
===Radioactive Waste System Walkdown (IP Section 02.02) (1 Sample)=== | |||
The inspectors evaluated the following radioactive waste processing systems and processes during plant walkdowns. | The inspectors evaluated the following radioactive waste processing systems and processes during plant walkdowns. | ||
| Line 300: | Line 384: | ||
Radioactive waste resin and/or sludge discharges processes: | Radioactive waste resin and/or sludge discharges processes: | ||
* High Integrity Container Receipt, Handling, Use, and Closure | * High Integrity Container Receipt, Handling, Use, and Closure | ||
* Self-Engaging Rapid Dewatering Systems (SERDS) Operation | * Self-Engaging Rapid Dewatering Systems (SERDS) Operation | ||
===Shipment Preparation (IP Section 02.04) (1 Sample)=== | ===Shipment Preparation (IP Section 02.04) (1 Sample)=== | ||
| Line 313: | Line 397: | ||
* 18-RW-034 | * 18-RW-034 | ||
* 18-SH-018 | * 18-SH-018 | ||
* 18-SH-062 Waste Characterization and Classification (IP Section 02.03) (1 Sample) | * 18-SH-062 | ||
===Waste Characterization and Classification (IP Section 02.03) (1 Sample)=== | |||
The inspectors evaluated the radioactive waste characterization and classification for the following waste streams: | The inspectors evaluated the radioactive waste characterization and classification for the following waste streams: | ||
* Dry Active Waste streams for Unit 1 (Sample ID: 1-17-042), | * Dry Active Waste streams for Unit 1 (Sample ID: 1-17-042), | ||
| Line 322: | Line 408: | ||
==OTHER ACTIVITIES - BASELINE== | ==OTHER ACTIVITIES - BASELINE== | ||
===71151 - Performance Indicator Verification | |||
The inspectors verified licensee performance indicators submittals listed below: | |||
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)=== | |||
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01) === | |||
{{IP sample|IP=IP 71151|count=3}} | {{IP sample|IP=IP 71151|count=3}} | ||
Units 1, 2, and 3, January 1, 2018-December 31, 2018 IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) | |||
Units 1, 2, and 3, January 1, 2018-December 31, 2018 | |||
Units 1, 2, and 3, January 1, 2018-December 31, 2018 IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) | |||
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (3 Samples) | |||
Units 1, 2, and 3, January 1, 2018-December 31, 2018 MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) (3 Samples) | |||
Units 1, 2, and 3, January 1, 2018-December 31, 2018 | Units 1, 2, and 3, January 1, 2018-December 31, 2018 IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (3 Samples) | ||
Units 1, 2, and 3, January 1, 2018-December 31, 2018 | |||
===MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) (3 Samples)=== | |||
Units 1, 2, and 3, January 1, 2018-December 31, 2018 | |||
===Drill/Exercise Performance (IP Section 02.12) (1 Sample)=== | ===Drill/Exercise Performance (IP Section 02.12) (1 Sample)=== | ||
| Line 339: | Line 432: | ||
The inspector reviewed data for the ERO Participation Performance indicator for the period January 1, 2018, through December 31, 2018. | The inspector reviewed data for the ERO Participation Performance indicator for the period January 1, 2018, through December 31, 2018. | ||
Alert & Notification System Reliability (IP Section 02.14) (1 Sample) | ===Alert & Notification System Reliability (IP Section 02.14) (1 Sample)=== | ||
The inspector reviewed data for the Alert and Notification Performance indicator for the period January 1, 2018, through December 31, 2018. | The inspector reviewed data for the Alert and Notification Performance indicator for the period January 1, 2018, through December 31, 2018. | ||
==71152 - Problem Identification and Resolution Annual Follow-up of Selected Issues (IP Section 02.03)== | ==71152 - Problem Identification and Resolution== | ||
===Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)=== | |||
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues: | The inspectors reviewed the licensees implementation of its corrective action program related to the following issues: | ||
: (1) Units 1 and 3 control element drive mechanism control system power switch assembly failures | : (1) Units 1 and 3 control element drive mechanism control system power switch assembly failures | ||
| Line 350: | Line 442: | ||
==OTHER ACTIVITIES== | ==OTHER ACTIVITIES== | ||
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 60854 - Preoperational Testing of an Independent Spent Fuel Storage Inspection (ISFSI) | - TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL | ||
60854 - Preoperational Testing of an Independent Spent Fuel Storage Inspection (ISFSI) | |||
An ISFSI inspection was conducted at PVNGS on March 19-21, 2019, by inspectors from Region I, Division of Nuclear Materials Safety. The PVNGS ISFSI was licensed as a general 10 CFR Part 72 licensee. The licensee had been utilizing the NAC, Universal Multi-Purpose Canister system (UMS), approved under Certificate of Compliance (CoC) 72-1015, Amendment 5, and NAC UMS Final Safety Analysis Report (FSAR), Revision 11, to load and store spent fuel at their ISFSI. At the time of the on-site inspection, PVNGSs ISFSI pad contained 152 NAC ventilated concrete casks (VCCs), each containing the steel Transportable Storage Container (TSC) with a capacity for 24 pressurized water reactor (PWR) spent fuel assemblies. The last routine ISFSI inspection was performed in March 2017 (ADAMS Accession No. ML17130B002). | An ISFSI inspection was conducted at PVNGS on March 19-21, 2019, by inspectors from Region I, Division of Nuclear Materials Safety. The PVNGS ISFSI was licensed as a general 10 CFR Part 72 licensee. The licensee had been utilizing the NAC, Universal Multi-Purpose Canister system (UMS), approved under Certificate of Compliance (CoC) 72-1015, Amendment 5, and NAC UMS Final Safety Analysis Report (FSAR), Revision 11, to load and store spent fuel at their ISFSI. At the time of the on-site inspection, PVNGSs ISFSI pad contained 152 NAC ventilated concrete casks (VCCs), each containing the steel Transportable Storage Container (TSC) with a capacity for 24 pressurized water reactor (PWR) spent fuel assemblies. The last routine ISFSI inspection was performed in March 2017 (ADAMS Accession No. ML17130B002). | ||
| Line 381: | Line 476: | ||
71111.01Adverse Weather Protection | 71111.01Adverse Weather Protection | ||
Procedures | Procedures | ||
Number | Number | ||
40OP-9ZZ19 | Title | ||
40OP-9HS01 | Revision | ||
40OP-9ZZ19 | |||
Hot Weather Protection | |||
40OP-9HS01 | |||
Site Building HVAC | |||
Calculations | Calculations | ||
Number | Number | ||
13-MC-SP-0307 | Title | ||
Analysis | Revision | ||
13-MC-SP-0307 | |||
SP/EW System Thermal Performance Design Bases | |||
Analysis | |||
71111.04Equipment Alignment | 71111.04Equipment Alignment | ||
Condition Reports | Condition Reports | ||
17-02911 | 17-02911 | ||
Work Orders | Work Orders | ||
2711244 | 2711244 | ||
2781196 | |||
Procedures | Procedures | ||
Number | Number | ||
40OP-9DG01 | Title | ||
40ST-9SI13 | Revision | ||
40OP-9DG01 | |||
Emergency Diesel Generator A | |||
40ST-9SI13 | |||
Train A LPSI and CS System Alignment Verification | |||
Drawings | Drawings | ||
Number | Number | ||
13-M-DGP-0001 | Title | ||
Revision | |||
13-M-DGP-0001 | |||
P & I Diagram Diesel Generator System | |||
71111.05AQFire Protection Annual/Quarterly | 71111.05AQFire Protection Annual/Quarterly | ||
Miscellaneous Documents | Miscellaneous Documents | ||
Number | Revision | ||
PVNGS Updated FSAR | or Date | ||
PVGS Pre-Fire Strategies Manual | Number | ||
13-MC-ZA-0808 | Title | ||
Fire Protection Database Detailed Report | PVNGS Updated FSAR | ||
PVNGS Safety Evaluation Report | |||
PVGS Pre-Fire Strategies Manual | |||
13-MC-ZA-0808 | |||
MSSS Flooding At Elevation 81 | |||
Fire Protection Database Detailed Report | |||
05/09/1998 | |||
PVNGS Safety Evaluation Report | |||
71111.06Flood Protection Measures | 71111.06Flood Protection Measures | ||
Condition Reports | Condition Reports | ||
19-02890 | 19-02890 | ||
19-02658 | |||
19-02418 | |||
19-02625 | |||
Procedures | Procedures | ||
Number | Number | ||
40DP-9OPA3 | Title | ||
40AL-9RK2B | Revision | ||
40OP-9RD01 | 40DP-9OPA3 | ||
Auxiliary Building Station Rounds | |||
40AL-9RK2B | |||
Panel B02B Alarm Response | |||
40OP-9RD01 | |||
Radwaste Facility Sumps and Drains | |||
Drawings | Drawings | ||
Number | Number | ||
01-M-RDP-002 | Title | ||
2-M-RDP-002 | Revision | ||
03-M-RDP-002 | 01-M-RDP-002 | ||
Miscellaneous Documents | Radioactive Waste Drain System | ||
Number | 2-M-RDP-002 | ||
PVNGS Updated FSAR | Radioactive Waste Drain System | ||
Pre-Fire Strategies Manual | 03-M-RDP-002 | ||
13-MC-ZA-0808 | Radioactive Waste Drain System | ||
PO EDC-2019- | |||
Miscellaneous Documents | |||
Revision | |||
or Date | |||
Number | |||
Title | |||
PVNGS Updated FSAR | |||
Pre-Fire Strategies Manual | |||
13-MC-ZA-0808 | |||
MSSS Flooding at Elevation 81 | |||
PO EDC-2019- | |||
00144 | 00144 | ||
Revise Calculation 13-MC-ZA-0808 | |||
03/01/2019 | |||
71111.11Licensed Operator Requalification Program and Licensed Operator Performance | 71111.11Licensed Operator Requalification Program and Licensed Operator Performance | ||
Procedures | Procedures | ||
Number | Number | ||
40DP-9OP02 | Title | ||
01DP-0AP57 | Revision | ||
Performed Test or Evolutions | 40DP-9OP02 | ||
Conduct of Operations | |||
01DP-0AP57 | |||
Management of Critical Evolutions and Infrequently | |||
Performed Test or Evolutions | |||
Miscellaneous Documents | Miscellaneous Documents | ||
Number | Date | ||
Licensed Operator Continuing Training Simulator | Number | ||
Title | |||
Licensed Operator Continuing Training Simulator | |||
Evaluation Scenario | Evaluation Scenario | ||
2/05/2019 | |||
71111.12Maintenance Effectiveness | 71111.12Maintenance Effectiveness | ||
Condition Reports | Condition Reports | ||
18-16615 | 18-16615 | ||
18-10880 | 18-02240 | ||
18-01811 | |||
19-02330 | |||
19-02133 | |||
18-10880 | |||
18-10879 | |||
19-02364 | |||
Work Orders | Work Orders | ||
4441828 | 4441828 | ||
4441462 | |||
Miscellaneous Documents | Miscellaneous Documents | ||
Number | Number | ||
19-02330-006 | Title | ||
Palo Verde Maintenance Rule Database | Date | ||
19-02330-006 | |||
Engineering Evaluation | |||
2/21/2019 | |||
Palo Verde Maintenance Rule Database | |||
71111.13Maintenance Risk Assessments and Emergent Work Control | 71111.13Maintenance Risk Assessments and Emergent Work Control | ||
Condition Reports | Condition Reports | ||
16-15545 | 16-15545 | ||
Procedures | Procedures | ||
Number | Number | ||
40DP-9RS01 | Title | ||
Revision | |||
40DP-9RS01 | |||
Operations Department Online Nuclear Risk | |||
Management in Modes 1 and 2 | Management in Modes 1 and 2 | ||
70DP-0RA05 | 70DP-0RA05 | ||
Assessment and Management of Risk When Performing | |||
Maintenance | Maintenance | ||
40DP-9AP21 | 40DP-9AP21 | ||
Protected Equipment | |||
Miscellaneous Documents | Miscellaneous Documents | ||
Number | Number | ||
EOOS 4.1 | Title | ||
EOOS 4.1 | Date | ||
EOOS 4.1 | |||
Schedulers Evaluation for Palo Verde Unit 1 | |||
2/21/2019 09:41 | |||
EOOS 4.1 | |||
Schedulers Evaluation for Palo Verde Unit 3 | |||
03/05/2019 | |||
71111.15Operability Determinations and Functionality Assessments | 71111.15Operability Determinations and Functionality Assessments | ||
Condition Reports | Condition Reports | ||
18-16665 | 18-16665 | ||
19-01290 | 17-04204 | ||
19-04380 | 18-18476 | ||
19-02567 | |||
19-02330 | |||
19-01290 | |||
18-17794 | |||
19-01962 | |||
19-01941 | |||
14-00853 | |||
19-04380 | |||
19-04382 | |||
Work Orders | Work Orders | ||
5071741 | 5071741 | ||
Procedures | Procedures | ||
Number | Number | ||
40DP-9OP26 | Title | ||
Revision | |||
40DP-9OP26 | |||
Operations Condition Reporting Process and Operability | |||
Determination / Functionality Assessment | Determination / Functionality Assessment | ||
73DP-0EE05 | 73DP-0EE05 | ||
Engineering Preventive Maintenance Program | |||
Procedures | Procedures | ||
Number | Number | ||
40OP-9SV01 | Title | ||
73TI-9ZZ35 | Revision | ||
31MT-9RC23 | 40OP-9SV01 | ||
Loose Parts and Vibration Monitoring | |||
73TI-9ZZ35 | |||
Ultrasonic Examination of Reactor Coolant Pump Shafts 7 | |||
31MT-9RC23 | |||
Reactor Coolant Pump Sulzer Bingham Seal | |||
Replacement | Replacement | ||
40TI-9SF01 | 40TI-9SF01 | ||
Miscellaneous Documents | Pressurizer Level Control System Tuning | ||
Number | |||
18-17794-004 | Miscellaneous Documents | ||
TR-100491 | Revision | ||
Design Basis Manual: Safety Injection System | or Date | ||
CRAI 3245187 | Number | ||
Title | |||
18-17794-004 | |||
Level 2 Cause Analysis Report | |||
TR-100491 | |||
EPRI: UPS Maintenance and Application Guide | |||
Design Basis Manual: Safety Injection System | |||
CRAI 3245187 | |||
Evaluation of the Class-1E and PK Inverters and | |||
Associated Subcomponents | Associated Subcomponents | ||
CRDR 3300933 | CRDR 3300933 | ||
RCTSAI 4524360 | Year SCR Replacement for PN and PK Inverters | ||
RCTSAI 4524358 | RCTSAI 4524360 | ||
RCP Vibration Monitoring | |||
04/17/2014 | |||
RCTSAI 4524358 | |||
RCP Shaft Ultrasonic Inspection Following Seal | |||
Replacement | Replacement | ||
RCTS 4524352 | 04/17/2014 | ||
PVAR 4524366 | RCTS 4524352 | ||
RCP Vibration Monitoring and Shaft UT Inspections | |||
04/18/2014 | |||
PVAR 4524366 | |||
Actions for License Amendments 84, 72, and 56 | |||
04/17/2014 | |||
71111.18Plant Modifications | 71111.18Plant Modifications | ||
Condition Reports | Condition Reports | ||
16-19472 | 16-19472 | ||
19-02927 | |||
14-00965 | |||
18-04376 | |||
Work Orders | Work Orders | ||
3094267 | 3094267 | ||
4805058 | |||
Miscellaneous Documents | Miscellaneous Documents | ||
Number | Number | ||
S-19-0005 | Title | ||
18-04376-004 | Revision | ||
S-19-0005 | |||
CFR 50.59 Screening/Evaluation | |||
18-04376-004 | |||
Design Equivalent Change Package: TMOD SBOG#! | |||
Lube Oil High Pressure Alarm Set point Schedule | Lube Oil High Pressure Alarm Set point Schedule | ||
Adjustment | Adjustment | ||
71111.19Post Maintenance Testing | 71111.19Post Maintenance Testing | ||
Condition Reports | Condition Reports | ||
16-03732 | 16-03732 | ||
19-03482 | |||
19-04033 | |||
Work Orders | Work Orders | ||
5103635 | 5103635 | ||
4960255 | 4945749 | ||
4498502 | |||
4507037 | |||
4752532 | |||
5055992 | |||
5076980 | |||
4960255 | |||
5085998 | |||
Procedures | Procedures | ||
Number | Number | ||
40OP-9DG01 | Title | ||
40OP-9DF01 | Revision | ||
73ST-9DF01 | 40OP-9DG01 | ||
40OP-9SF01 | Emergency Diesel Generator A | ||
40OP-9DF01 | |||
Diesel Fuel Oil Storage and Transfer | |||
73ST-9DF01 | |||
Diesel Fuel Oil Transfer Pumps - Inservice Test | |||
40OP-9SF01 | |||
Control Element Drive Mechanism Control System | |||
(CEDMCS) Operation | |||
71111.22Surveillance Testing | 71111.22Surveillance Testing | ||
Work Orders | Work Orders | ||
4802907 | 4802907 | ||
4936283 | |||
4937964 | |||
4940893 | |||
Procedures | Procedures | ||
Number | Number | ||
36ST-9SA02 | Title | ||
40ST-9DG01 | Revision | ||
73ST-9DG07 | 36ST-9SA02 | ||
ESFAS Train B Subgroup Relay Functional Test | |||
40ST-9DG01 | |||
Diesel Generator A Test | |||
73ST-9DG07 | |||
Class 1E Diesel Generator Load Rejection 24 Hour | |||
Rated Load And Hot Start Test Train A | Rated Load And Hot Start Test Train A | ||
77ST-9SB19 | 77ST-9SB19 | ||
73ST-9EW01 | CPCS Channel C Functional Test | ||
73ST-9EW01 | |||
Essential Cooling Water Pumps - Inservice Test | |||
71114.06Drill Evaluation | 71114.06Drill Evaluation | ||
Miscellaneous Documents | Miscellaneous Documents | ||
Number | Number | ||
1901 | Title | ||
TSC - Position Log | Date | ||
Significant Events Log | 1901 | ||
Form EP-0541 | Dress Rehearsal Controller Guide | ||
TSC - Position Log | |||
2/05/2019 | |||
Significant Events Log | |||
2/05/2019 | |||
Form EP-0541 | |||
Palo Verde NAN Emergency Message Form | |||
71124.05Radiation Monitoring Instrumentation | 71124.05Radiation Monitoring Instrumentation | ||
Procedures | Procedures | ||
Number | Number | ||
74DP-9CY08 | Title | ||
Revision | |||
74DP-9CY08 | |||
Radiological Monitoring Program | |||
Procedures | Procedures | ||
Number | Number | ||
74ST-9SQ23 | Title | ||
Revision | |||
74ST-9SQ23 | |||
Radiation Monitoring Calibration Test for New Scope Area | |||
Monitors | Monitors | ||
74ST-9SQ33 | 74ST-9SQ33 | ||
Radiation Monitoring Calibration Test for Main Steam Line | |||
Monitors | Monitors | ||
75RP-9EQ04 | 75RP-9EQ04 | ||
Calibration of the Eberline PNR-4 Neutron Dose Rate | |||
Instrument | Instrument | ||
75RP-9EQ13 | 75RP-9EQ13 | ||
75RP-9EQ31 | Canberra Whole Body Counting System Calibration | ||
75RP-9EQ31 | |||
Calibration, Response Check and Operation of the SAM-12 | |||
Small Article Monitor | Small Article Monitor | ||
75RP-9EQ47 | 75RP-9EQ47 | ||
75RP-9EQ66 | Calibration of the Eberline Model HP Series Frisker Probes | ||
75RP-9EQ66 | |||
Calibration of the Thermo Scientific Model RO-20 | |||
Ion Chamber Survey Meter | Ion Chamber Survey Meter | ||
75RP-9ME05 | 75RP-9ME05 | ||
Scaler Counting Systems Performance Checks | |||
Audits and Self-Assessments | Audits and Self-Assessments | ||
Number | Number | ||
2Q 2017 | Title | ||
Date | |||
2Q 2017 | |||
Integrated Performance Assessment Report: | |||
Radiation Protection Department | Radiation Protection Department | ||
2018-001 | 09/14/2017 | ||
218-04312 | 2018-001 | ||
2018-007 | Audit Plan and Report: Chemistry | ||
04/06/2018 | |||
218-04312 | |||
2017 Annual Radiation Protection Program Summary Report | |||
07/11/2018 | |||
2018-007 | |||
Audit Plan and Report: Radiation Safety | |||
2/14/2018 | |||
Condition Reports | Condition Reports | ||
17-01400 | 17-01400 | ||
17-13492 | 17-02247 | ||
17-08311 | |||
17-11014 | |||
17-13020 | |||
17-13492 | |||
17-15582 | |||
17-17353 | |||
18-02590 | |||
18-09583 | |||
Portable Instrumentation Calibration Data Sheet | Portable Instrumentation Calibration Data Sheet | ||
Number | Number | ||
4380 | Title | ||
8143 | Date | ||
2708085 | 4380 | ||
2914/12818 | PNR-4/NRD-1 Calibration Data Sheet | ||
RAS-1 Air Sampler Calibration Data Sheet | 07/10/2018 | ||
1182 | 8143 | ||
2927 | RO-20 Meter Data Sheet | ||
09/07/2018 | |||
2708085 | |||
DRM 1/2 Calibration Data Sheet | |||
10/01/2018 | |||
2914/12818 AMS-4 Calibration Data Sheet | |||
10/09/2018 | |||
RAS-1 Air Sampler Calibration Data Sheet | |||
10/19/2018 | |||
1182 | |||
RM-20 Count Rate Meter Data Sheet | |||
01/04/2019 | |||
2927 | |||
FH 40 GL Internal Detector Calibration Data Sheet | |||
01/15/2019 | |||
Portable Instrumentation Calibration Data Sheet | Portable Instrumentation Calibration Data Sheet | ||
Number | Number | ||
11499 | Title | ||
Date | |||
11499 | |||
FHZ 612 Teleprobe Detector Calibration Data Sheet | |||
01/24/2019 | |||
Stationary Radiation Instrument Calibration Records | Stationary Radiation Instrument Calibration Records | ||
Number | Number | ||
668 | Title | ||
FastScan2 | Date | ||
364 | 668 | ||
2983 | Small Article Monitor Calibration Data Sheet | ||
24 | 09/18/2018 | ||
213 | FastScan2 | ||
2020 | Calibration Verification Data Sheet | ||
01/16/2019 | |||
364 | |||
BC-4 Instrument Calibration Data Sheet | |||
01/22/2019 | |||
2983 | |||
3030P Calibration Data Sheet | |||
01/23/2019 | |||
24 | |||
CM-11 Calibration Data Sheet | |||
01/24/2019 | |||
213 | |||
PM-12 Calibration Cover Sheet | |||
01/31/2019 | |||
2020 | |||
iPCM-12 Calibration Cover Sheet | |||
2/05/2019 | |||
Calibration Source Records | Calibration Source Records | ||
Number | Number | ||
N997-0358 | Title | ||
Date | |||
N997-0358 | |||
Kaman Report of Calibration Model KDA-HR High Range | |||
Area Monitor Ion Chamber Detector | Area Monitor Ion Chamber Detector | ||
8143 | 01/23/1980 | ||
940521 | 8143 | ||
Shepherd Model 89 Verification Sheet | |||
10/14/2018 | |||
940521 | |||
CDM-21 Calibrator Verification Report | |||
10/24/2018 | |||
Work Order Records | Work Order Records | ||
Number | Number | ||
4980211 | Title | ||
Date | |||
4980211 | |||
74ST9SQ343 Radiation Monitoring Calibration Test for | |||
Waste Gas Decay Tank RMC Monitor (Unit 3) RU-12 | Waste Gas Decay Tank RMC Monitor (Unit 3) RU-12 | ||
4867547 | 03/08/2018 | ||
4867547 | |||
74ST9SQ333 Radiation Monitoring Calibration Test for Main | |||
Steam Line Monitors. (Unit 3) (RU-139/140) | Steam Line Monitors. (Unit 3) (RU-139/140) | ||
4889856 | 04/23/2018 | ||
4889856 | |||
"B" CTMT Build Refueling Purge Exhaust Monitor (Unit 1 | |||
RU-34) | RU-34) | ||
4898443 | 07/25/2018 | ||
4948127 | 4898443 | ||
4911530 | Personnel IARM A-Side (Unit 1 RU-155D) | ||
08/28/2018 | |||
4948127 | |||
"A" Essential Cooling Water Radiation Monitor (Unit 3 RU-02) 09/13/2018 | |||
4911530 | |||
74ST9SQ232 Radiation Monitoring Calibration Test for | |||
Baseline Area Monitors (Unit 2 RU-148-151) | Baseline Area Monitors (Unit 2 RU-148-151) | ||
10/23/2018 | |||
Miscellaneous Documents | Miscellaneous Documents | ||
Number | Number | ||
LS-6500 (U1, U2, & U3) | Title | ||
U1 MCA Detectors 1, 2, & 3 QC: 88 and 1332 keV Activity and 1332 keV FWHM | Date | ||
LS-6500 (U1, U2, & U3) | |||
QC: Observed Source Response - dpm | |||
2018 | |||
U1 MCA Detectors 1, 2, & 3 QC: 88 and 1332 keV Activity and 1332 keV FWHM | |||
2018 | |||
Miscellaneous Documents | Miscellaneous Documents | ||
Number | Number | ||
U2 MCA Detectors 1, 2, & 3 | Title | ||
U3 MCA Detectors 1, 2, & 3 | Date | ||
237-03041-CAS | U2 MCA Detectors 1, 2, & 3 QC: 88 and 1332 keV Activity and 1332 keV FWHM | ||
237-03046-CAS | 2018 | ||
U3 MCA Detectors 1, 2, & 3 QC: 88 and 1332 keV Activity and 1332 keV FWHM | |||
2018 | |||
237-03041-CAS | |||
2nd Quarter 2018 Chemistry Hot Cross Checks | |||
07/27/2018 | |||
237-03046-CAS | |||
4th Quarter 2018 Chemistry Hot Cross Checks | |||
01/22/2019 | |||
71124.06Radioactive Gaseous and Liquid Effluent Treatment | 71124.06Radioactive Gaseous and Liquid Effluent Treatment | ||
Procedures | Procedures | ||
Number | Number | ||
74AL-9SQ01 | Title | ||
74RM-9EF20 | Revision | ||
74AL-9SQ01 | |||
Radiation Monitoring Systems Alarm Validation and Response 001 | |||
74RM-9EF20 | |||
Gaseous Radioactive Release Permits and Offsite Dose | |||
Assessment | Assessment | ||
74RM-9EF23 | 018 | ||
74RM-9EF40 | 74RM-9EF23 | ||
74RM-9EF41 | Secondary System Liquid Discharge | ||
74RM-9EF42 | 016 | ||
74RM-9EF43 | 74RM-9EF40 | ||
Radiation Monitoring System Operations | |||
2 | |||
74RM-9EF41 | |||
Radiation Monitoring System Alarm Response | |||
23 | |||
74RM-9EF42 | |||
Radiation Monitor Alarm Setpoint Determination | |||
033 | |||
74RM-9EF43 | |||
Actions for Non-Functional Radiation Monitors: Preplanned | |||
Alternate Sampling Program | Alternate Sampling Program | ||
74RM-9EF60 | 017 | ||
74RM-9EF63 | 74RM-9EF60 | ||
74RM-9EF65 | RMS Sample Collection | ||
74RM-9EF80 | 2 | ||
75RM-9EF01 | 74RM-9EF63 | ||
RU-143 Sample Operations | |||
001 | |||
74RM-9EF65 | |||
RU-145 Sample Operations | |||
000 | |||
74RM-9EF80 | |||
RMS/Effluent Action Documentation | |||
006 | |||
75RM-9EF01 | |||
Determination of Primary-to-Secondary Leak Rate | |||
000 | |||
Audits and Self-Assessments | Audits and Self-Assessments | ||
Number | Number | ||
17-11047-003 | Title | ||
2018-001 | Date | ||
2018-04312 | 17-11047-003 | ||
Radiological Monitoring Program | |||
09/07/2017 | |||
2018-001 | |||
Nuclear Assurance Department (NAD): Chemistry | |||
04/06/2018 | |||
2018-04312 | |||
2017 Annual Radiation Protection Program Summary | |||
Report | Report | ||
2018-007 | 07/11/2018 | ||
2018-007 | |||
Nuclear Assurance Department (NAD): Radiation Safety | |||
2/14/2018 | |||
Condition Reports | Condition Reports | ||
16-02244 | 16-02244 | ||
17-07961 | 17-0299 | ||
18-02621 | 17-01573 | ||
18-09004 | 17-01926 | ||
18-14342 | 17-05289 | ||
17-07961 | |||
17-11047 | |||
17-11559 | |||
17-13603 | |||
17-17884 | |||
18-02621 | |||
18-04140 | |||
18-04530 | |||
18-06915 | |||
18-08466 | |||
18-09004 | |||
18-11148 | |||
18-12193 | |||
18-13299 | |||
18-14265 | |||
18-14342 | |||
18-17591 | |||
19-00212 | |||
19-01531 | |||
Effluent Monitor Calibration Records | Effluent Monitor Calibration Records | ||
Number | Number | ||
STWO 04715454 RU-145 Unit 2 Fuel Building B Vent Exhaust Monitor Low | Title | ||
STWO 04736183 RU-143 Unit 3 Plant Vent Monitor Low | Date | ||
STWO 04760261 RU-146 Unit 3 Fuel Building B Vent Exhaust Monitor High | STWO 04715454 | ||
RU-145 Unit 2 Fuel Building B Vent Exhaust Monitor Low | |||
2/22/2017 | |||
STWO 04736183 | |||
RU-143 Unit 3 Plant Vent Monitor Low | |||
04/22/2017 | |||
STWO 04760261 | |||
RU-146 Unit 3 Fuel Building B Vent Exhaust Monitor High | |||
Calibration | Calibration | ||
STWO 04863095 RU-144 Unit 1 Plant Vent Monitor High | 05/10/2017 | ||
STWO 04980503 RU-12 Unit 1 Waste Gas Decay Tank Monitor | STWO 04863095 | ||
STWO 04904815 RU-143 Unit 2 Plant Vent Monitor Low | RU-144 Unit 1 Plant Vent Monitor High | ||
09/15/2017 | |||
STWO 04980503 | |||
RU-12 Unit 1 Waste Gas Decay Tank Monitor | |||
03/19/2018 | |||
STWO 04904815 | |||
RU-143 Unit 2 Plant Vent Monitor Low | |||
09/20/2018 | |||
Air Cleaning System Surveillance Test Records | Air Cleaning System Surveillance Test Records | ||
Number | Number | ||
STWO 4777407 Unit 1 Containment Building Purge Air Filtration Unit | Title | ||
STWO 4813386 Unit 2 Fuel and Aux Building Essential Air Filtration Unit | Date | ||
STWO 4836778 Unit 1 Fuel and Aux Building Essential Air Filtration Unit | STWO 4777407 Unit 1 Containment Building Purge Air Filtration Unit | ||
STWO 4866355 Unit 3 Fuel and Aux Building Essential Air Filtration Unit 05/29/2018 | 09/06/2017 | ||
STWO 4813386 Unit 2 Fuel and Aux Building Essential Air Filtration Unit | |||
2/21/2017 | |||
STWO 4836778 Unit 1 Fuel and Aux Building Essential Air Filtration Unit | |||
2/09/2018 | |||
STWO 4866355 Unit 3 Fuel and Aux Building Essential Air Filtration Unit | |||
05/29/2018 | |||
Gaseous Discharge Permits | Gaseous Discharge Permits | ||
Number | Number | ||
20172058 | Title | ||
20182030 | Date | ||
20182103 | 20172058 | ||
20181142 | Unit 2 Refueling Purge | ||
20181145 | 05/02/2017 | ||
20191015 | 20182030 | ||
20192013 | Unit 2 Plant Vent | ||
20192015 | 03/15/2018 | ||
20182103 | |||
Unit 2 Fuel Building Vent | |||
09/11/2018 | |||
20181142 | |||
Unit 1 Plant Vent | |||
11/08/2018 | |||
20181145 | |||
Unit 1 Fuel Building Vent | |||
11/20/2018 | |||
20191015 | |||
Unit 1 Fuel Building Vent | |||
01/29/2019 | |||
20192013 | |||
Unit 2 Plant Vent | |||
01/31/2019 | |||
20192015 | |||
Unit 2 Fuel Building Vent | |||
2/05/2019 | |||
Counting Detector Calibrations | Counting Detector Calibrations | ||
Number | Number | ||
GMAR4L HpGE Geometry - Unit 3 4500 cc gas Marinelli beaker | Title | ||
PFIL1 | Date | ||
CCART1 HpGE Geometry - Unit 1 F&J cartridge on shelf 1 | GMAR4L | ||
CP1001 | HpGE Geometry - Unit 3 4500 cc gas Marinelli beaker | ||
GMAR1L HpGE Geometry - Unit 1 Gas 1L Marinelli beaker on detector face | 01/14/2016 | ||
GVIAL1 | PFIL1 | ||
HpGE Geometry - Unit 1 Particulate filer on shelf 1 | |||
07/20/2016 | |||
CCART1 | |||
HpGE Geometry - Unit 1 F&J cartridge on shelf 1 | |||
07/22/2016 | |||
CP1001 | |||
HpGE Geometry - Unit 2 CP100 charcoal face down shelf 1 | |||
11/21/2017 | |||
GMAR1L | |||
HpGE Geometry - Unit 1 Gas 1L Marinelli beaker on detector face | |||
2/08/2017 | |||
GVIAL1 | |||
HpGE Geometry - Unit 2 9.2 cc gas vial shelf 1 | |||
2/14/2017 | |||
Miscellaneous Documents | Miscellaneous Documents | ||
Number | Number | ||
Palo Verde Generating Station Daily Status Report | Title | ||
Date | |||
Palo Verde Generating Station Daily Status Report | |||
2/5-8/2019 | |||
Miscellaneous Documents | Miscellaneous Documents | ||
Number | Number | ||
Offsite Dose Calculation Manual (ODCM) Palo Verde | Title | ||
Date | |||
Offsite Dose Calculation Manual (ODCM) Palo Verde | |||
Nuclear Generating Station Units 1, 2, and 3 | Nuclear Generating Station Units 1, 2, and 3 | ||
RCTSAI 1566 | 03/24/2016 | ||
2-17-014 | RCTSAI 1566 | ||
1-17-042 | 2016 Annual Radioactive Effluent Release Report | ||
3-18-040 | 04/15/2017 | ||
RCTSAI 1566 | 2-17-014 | ||
Waste Stream Report: Unit 2 Dry Active Waste | |||
04//18/2017 | |||
1-17-042 | |||
Waste Stream Report: Unit 1 Dry Active Waste | |||
10/28/2017 | |||
3-18-040 | |||
Waste Stream Report: Unit 3 Dry Active Waste | |||
04/15/2018 | |||
RCTSAI 1566 | |||
2017 Annual Radioactive Effluent Release Report | |||
04/25/2018 | |||
71124.07Radiological Environmental Monitoring Program | 71124.07Radiological Environmental Monitoring Program | ||
Procedures | Procedures | ||
Number | Number | ||
74RM-0EN02 | Title | ||
74RM-0EN03 | Revision | ||
74RM-0EN05 | 74RM-0EN02 | ||
74RM-0EN07 | Radiological Environmental Air Sampling | ||
74RM-0EN03 | |||
Radiological Environmental Sampling | |||
74RM-0EN05 | |||
Environmental TLD Exchange/Reporting | |||
74RM-0EN07 | |||
Land Use Census | |||
Audits and Self-Assessments | Audits and Self-Assessments | ||
Number | Number | ||
Integrated Performance Assessment Report - Radiation | Title | ||
Date | |||
Integrated Performance Assessment Report - Radiation | |||
Protection Department Quarter #1 | Protection Department Quarter #1 | ||
Integrated Performance Assessment Report - Radiation | 06/22/2017 | ||
Integrated Performance Assessment Report - Radiation | |||
Protection Department Quarter #2 | Protection Department Quarter #2 | ||
Integrated Performance Assessment Report - Radiation | 09/14/2017 | ||
Integrated Performance Assessment Report - Radiation | |||
Protection Department Quarter #3 | Protection Department Quarter #3 | ||
Integrated Performance Assessment Report - Radiation | 2/19/2017 | ||
Integrated Performance Assessment Report - Radiation | |||
Protection Department Quarter #4 | Protection Department Quarter #4 | ||
218-04312 | 03/09/2018 | ||
Integrated Performance Assessment Report - Radiation | 218-04312 | ||
Annual Radiation Protection Program Summary Report | |||
07/11/2018 | |||
Integrated Performance Assessment Report - Radiation | |||
Protection 1st Half 2018 | Protection 1st Half 2018 | ||
08/15/2018 | |||
SWMS | |||
No. 15-04023-003 | No. 15-04023-003 | ||
2018-007 | Groundwater Protection Initiative NEW 07-07 | ||
2/06/2018 | |||
2018-007 | |||
Nuclear Assurance Department (NAD) Audit Plan and | |||
Report - Radiation Safety | Report - Radiation Safety | ||
2/14/2018 | |||
Condition Reports | Condition Reports | ||
17-00760 | 17-00760 | ||
17-03798 | 17-01085 | ||
17-06259 | 17-01203 | ||
17-10463 | 17-01859 | ||
17-03281 | |||
17-03798 | |||
17-04052 | |||
17-04054 | |||
17-04212 | |||
17-04747 | |||
17-06259 | |||
17-07102 | |||
17-07269 | |||
17-08535 | |||
17-10101 | |||
17-10463 | |||
17-10476 | |||
17-10693 | |||
17-15048 | |||
17-17823 | |||
Condition Reports | Condition Reports | ||
17-18260 | 17-18260 | ||
18-01500 | 18-00109 | ||
18-10111 | 18-00633 | ||
18-12934 | 18-01069 | ||
Groundwater Protection Documents | 18-01383 | ||
Number | 18-01500 | ||
75DP-9AP01 | 18-01583 | ||
SWMS No. | 18-03310 | ||
18-04530 | |||
18-06018 | |||
18-10111 | |||
18-10649 | |||
18-10739 | |||
18-11127 | |||
18-11210 | |||
18-12934 | |||
18-14265 | |||
18-15019 | |||
Groundwater Protection Documents | |||
Revision | |||
or Date | |||
Number | |||
Title | |||
75DP-9AP01 | |||
Ground Water Protection Program | |||
SWMS No. | |||
15-04023-003 | 15-04023-003 | ||
Groundwater Protection Initiative NEI 07-07 | |||
2/06/2018 | |||
Meteorological Calibration Records | Meteorological Calibration Records | ||
Number | Number | ||
WO 4905809 | Title | ||
WO 4905809 | Date | ||
WO 4988254 | WO 4905809 | ||
WO 4988280 | Met System Redundant Cab | ||
2/12/2017 | |||
WO 4905809 | |||
Met System Primary Cab A | |||
11/06/2017 | |||
WO 4988254 | |||
Met System Calibration (Primary System) | |||
10/10/2018 | |||
WO 4988280 | |||
Met System Calibration (Redundant System) | |||
10/10/2018 | |||
Miscellaneous Documents | Miscellaneous Documents | ||
Number | Number | ||
2016 | Title | ||
2017 | Date | ||
2016 | |||
Annual Radiological Environmental Operating Report | |||
04/14/2017 | |||
2017 | |||
Annual Radiological Environmental Operating Report | |||
04/10/2018 | |||
71124.08Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage, | 71124.08Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage, | ||
and Transportation | and Transportation | ||
Procedures | Procedures | ||
Number | Number | ||
75RP-9RP15 | Title | ||
Revision | |||
75RP-9RP15 | |||
Control and Storage of Radioactive Material and Radioactive | |||
Wastes | Wastes | ||
76DP-0AP12 | 76DP-0AP12 | ||
76-DP-0RP01 | Low Level Radioactive Material Storage Facility Overview | ||
76-DP-0RP03 | 76-DP-0RP01 | ||
76-RP-0RW03 | Radioactive Waste Management Program Overview | ||
76-RP-0RW05 | 76-DP-0RP03 | ||
76-RP-0RW06 | Radwaste Process Control Program | ||
76-RP-0RW07 | 76-RP-0RW03 | ||
76-RP-0RW08 | Waste Stream Sampling and Database Maintenance | ||
76-RP-0RW09 | 76-RP-0RW05 | ||
Packaging and Classification of Radioactive Waste | |||
76-RP-0RW06 | |||
Packaging of Radioactive Material | |||
76-RP-0RW07 | |||
Shipping Radioactive Materials | |||
76-RP-0RW08 | |||
High Integrity Container Receipt, Handling, Use, and Closure 4 | |||
76-RP-0RW09 | |||
Transfer, Storage and Processing of Radioactive Filters | |||
Procedures | Procedures | ||
Number | Number | ||
76-RP-0RW10 | Title | ||
Revision | |||
76-RP-0RW10 | |||
Handling and Storage of Radioactively Contaminated | |||
Chemical Waste and Mixed Waste | Chemical Waste and Mixed Waste | ||
76-RP-0RW82 | 76-RP-0RW82 | ||
Self-Engaging Rapid Dewatering System (SERDS) | |||
Operation | Operation | ||
91-DP-0EN50-02 | 91-DP-0EN50-02 | ||
Waste Stream Characterization Administrative Guideline | |||
Audits and Self-Assessments | Audits and Self-Assessments | ||
Number | Number | ||
202 | Title | ||
24365 | Date | ||
2017-002 NAD Audit: Procurement and Material Control | 202 | ||
2018-007 NAD Audit: Radiation Safety | NUPIC Audit: WMG, Inc. | ||
2-03734 January 2018 Offsite Safety Review Committee Meeting 18-001, | 03/18/2016 | ||
24365 | |||
NUPIC Audit: Energy Solutions | |||
2/04/2017 | |||
2017-002 | |||
NAD Audit: Procurement and Material Control | |||
05/05/2017 | |||
2018-007 | |||
NAD Audit: Radiation Safety | |||
2/14/2018 | |||
2-03734 January 2018 Offsite Safety Review Committee Meeting 18-001, | |||
Operations, Chemistry and Radiation Protection Subcommittee | Operations, Chemistry and Radiation Protection Subcommittee | ||
Report | Report | ||
01/26/2018 | |||
Shipping Packages | Shipping Packages | ||
17-RW-004 | 17-RW-004 | ||
18-RW-020 | 17-SH-036 | ||
18-SH-018 | 17-SH-055 | ||
17-SH-068 | |||
18-RW-009 | |||
18-RW-020 | |||
18-RW-022 | |||
18-RW-026 | |||
18-RW-028 | |||
18-RW-034 | |||
18-SH-018 | |||
18-SH-062 | |||
Condition Reports | Condition Reports | ||
17-02737 | 17-02737 | ||
17-18114 | 17-04797 | ||
Surveys | 17-12153 | ||
Survey Number | 17-13693 | ||
0-M-20190110-1 | 17-17333 | ||
0-M-20190110-3 | 17-18114 | ||
0-M-20190102-2 | 18-00790 | ||
0-M-20190123-1 | 18-03801 | ||
Sample Analyses | 18-07057 | ||
Type | |||
Unit 1 DAW | Surveys | ||
Unit 2 DAW | |||
Unit 3 DAW | Survey Number | ||
Unit 2 Oil | Title | ||
Date | |||
0-M-20190110-1 | |||
DAWPS Processing Area Monthly Survey | |||
01/10/2019 | |||
0-M-20190110-3 | |||
LLRMSF Monthly Survey | |||
01/10/2019 | |||
0-M-20190102-2 | |||
DAWPS Monthly Yard Survey | |||
01/10/2019 | |||
0-M-20190123-1 | |||
DAWPS Storage Area Monthly Routine Survey | |||
01/23/2019 | |||
Sample Analyses | |||
Type | |||
Sample ID | |||
Date | |||
Unit 1 DAW | |||
1-17-042 | |||
2/28/2018 | |||
Unit 2 DAW | |||
2-17-014 | |||
2/28/2018 | |||
Unit 3 DAW | |||
3-18-040 | |||
2/28/2018 | |||
Unit 2 Oil | |||
2-18-037 | |||
09/01/2017 | |||
Miscellaneous Documents | Miscellaneous Documents | ||
Number | Number | ||
NBA11C000113 Radiation Protection Technician Training | Title | ||
Date | |||
NBA11C000113 Radiation Protection Technician Training | |||
Program: Packaging Radioactive Material | Program: Packaging Radioactive Material | ||
NBA19C000109 Radiation Protection Technician Training | 08/14/2018 | ||
NBA19C000109 Radiation Protection Technician Training | |||
Program: Shipping Radioactive Material | Program: Shipping Radioactive Material | ||
2016 Annual Radioactive Effluent Release Report | 07/31/2015 | ||
2017 Annual Radioactive Effluent Release Report | 2016 Annual Radioactive Effluent Release Report | ||
Employee Training Records: Shipping Radioactive | 04/15/2017 | ||
2017 Annual Radioactive Effluent Release Report | |||
Waste Control Specialist Generator Certification 11/03/2017 and | 04/15/2018 | ||
Employee Training Records: Shipping Radioactive | |||
Material | |||
03/31/2017 and | |||
08/11/2017 | |||
Waste Control Specialist Generator Certification | |||
Approval Letter | |||
11/03/2017 and | |||
09/07/2018 | |||
71151Performance Indicator Verification | 71151Performance Indicator Verification | ||
Miscellaneous Documents | Miscellaneous Documents | ||
Number | Number | ||
NEI 99-02 | Title | ||
Revision | |||
NEI 99-02 | |||
Regulatory Performance Indicator Document | |||
71152Problem Identification and Resolution | 71152Problem Identification and Resolution | ||
Condition Reports | Condition Reports | ||
19-00802 | 19-00802 | ||
19-02376 | 18-18324 | ||
18-19112 | |||
18-15793 | |||
18-18212 | |||
19-02376 | |||
19-02956 | |||
19-03063 | |||
Work Orders | Work Orders | ||
4481512 | 4481512 | ||
5101889 | |||
Procedures | Procedures | ||
Number | Number | ||
36ST-9SA05 | Title | ||
Revision | |||
36ST-9SA05 | |||
FBEVAS, CREFAS, and CRVIAS 18 month Functional | |||
Test | Test | ||
40OP-9SA01 | 40OP-9SA01 | ||
40OP-9SA02 | BOP ESFAS Modules Operation | ||
40AL-9RK5A | 40OP-9SA02 | ||
40DP-9OP06 | De-Energization of BOP ESFAS | ||
40AL-9RK5A | |||
Panel B05A Alarm Response | |||
40DP-9OP06 | |||
Operations Department Repetitive Task Program | |||
130 | |||
Drawings | Drawings | ||
Number | Number | ||
01-E-SAB-004 | Title | ||
ESFAS Intertying Circuits Train A & Train B | Revision | ||
01-E-SAB-004 | |||
Elementary Diagram ESF Actuation System BOP- | |||
ESFAS Intertying Circuits Train A & Train B | |||
Miscellaneous Documents | Miscellaneous Documents | ||
Number | Number | ||
PVNGS Updated FSAR | Title | ||
Revision | |||
PVNGS Updated FSAR | |||
4OA5Other Activities (IP 60854) | 4OA5Other Activities (IP 60854) | ||
Condition Reports | Condition Reports | ||
19-04069 | 19-04069 | ||
Procedures | Procedures | ||
Number | Number | ||
GQP 9.0 | Title | ||
Revision | |||
GQP 9.0 | |||
PCI Training, Qualification, Examination, and | |||
Certification of NDE Personnel | Certification of NDE Personnel | ||
GQP 9.1 | GQP 9.1 | ||
PCI Training, Qualification, Examination, and | |||
Certification of Inspection and Testing Personnel | Certification of Inspection and Testing Personnel | ||
GQP 9.2 | GQP 9.2 | ||
PCI High Temperature Liquid Penetrant Examination | |||
and Acceptance Standards for Welds | and Acceptance Standards for Welds | ||
GQP 9.7 | GQP 9.7 | ||
PCI Liquid Penetrant Examination and Acceptance | |||
Standards for Welds (40 - 125 degrees F) | Standards for Welds (40 - 125 degrees F) | ||
GQP 9.6 | GQP 9.6 | ||
75DC-9SF02 | PCI Visual Examination of Welds | ||
PI-CNSTR-OP-PV- | 75DC-9SF02 | ||
Radiation Protection for Magnastor | |||
PI-CNSTR-OP-PV- | |||
NMS-01 | NMS-01 | ||
30DP-9MP23 | Closure Welding of Magnastor Canisters for PV | ||
MSLT-PCI-PV | 30DP-9MP23 | ||
Foreign Material Exclusion Controls | |||
MSLT-PCI-PV | |||
Helium Mass Spectrometer Leak Test Procedure | |||
4108-0 | |||
Design Basis Documents | Design Basis Documents | ||
Number | Number | ||
ISFSI FSAR | Title | ||
CoC 1031 | Revision | ||
ISFSI FSAR | |||
NAC Magnastor Final Safety Analysis Report | |||
CoC 1031 | |||
CoC and Technical Specifications for Magnastor | |||
System | System | ||
Miscellaneous Documents | Amendment 7 | ||
Number | Miscellaneous Documents | ||
Q-16A | Revision | ||
or Date | |||
Number | |||
Title | |||
Q-16A | |||
Leak Test Specialist NDE LT Level III Personnel | |||
Certificate | Certificate | ||
SAP #27044 | 09/19/2018 | ||
CMTRs | SAP #27044 | ||
PCI NDE VT/PT Level II Personnel Certificate | |||
01/15/2019 | |||
CMTRs | |||
Spotcheck Penetrant, SKL-SP2 Spotcheck Developer | |||
SKD-S2, SKC-S, and Sherwin Certification for D-100, D- | SKD-S2, SKC-S, and Sherwin Certification for D-100, D- | ||
350, KO-17, KO-19 Liquid Penetrant Materials | 350, KO-17, KO-19 Liquid Penetrant Materials | ||
Certificate of | Various dates | ||
Certificate of | |||
Miscellaneous Documents | Compliance | ||
Number | #915501-02 Various Welding Shims and Wire | ||
MC-GTAW | Various dates | ||
Miscellaneous Documents | |||
Revision | |||
or Date | |||
Number | |||
Title | |||
MC-GTAW | |||
PCI Welding Procedure Specification Machine Gas | |||
Tungsten Arc Welding | Tungsten Arc Welding | ||
PQR-62 | PQR-62 | ||
PQE-63 | PCI Procedure Qualification Record for WPS 8 | ||
PQR-600 | PQE-63 | ||
PQR-899 | PCI Procedure Qualification Record for Manual GTAW | ||
GTAW | PQR-600 | ||
PCI Procedure Qualification Record for Machine GTAW | |||
PQR-899 | |||
PCI Procedure Qualification Record for Machine 8 | |||
GTAW | |||
The following items are requested for the | The following items are requested for the | ||
Public Radiation Safety Inspection | Public Radiation Safety Inspection | ||
at Palo Verde | at Palo Verde | ||
Dates of Inspection: 02/04/2019 to 02/08/2019 | Dates of Inspection: 02/04/2019 to 02/08/2019 | ||
Integrated Report 2019001 | Integrated Report 2019001 | ||
| Line 890: | Line 1,610: | ||
file the information can be found. | file the information can be found. | ||
If you have any questions or comments, please contact Natasha Greene at 817-200-1154 or via | If you have any questions or comments, please contact Natasha Greene at 817-200-1154 or via | ||
e-mail at Natasha.Greene@nrc.gov. | e-mail at Natasha.Greene@nrc.gov. | ||
PAPERWORK REDUCTION ACT STATEMENT | PAPERWORK REDUCTION ACT STATEMENT | ||
This letter does not contain new or amended information collection requirements subject | This letter does not contain new or amended information collection requirements subject | ||
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | ||
collection requirements were approved by the Office of Management and Budget, | collection requirements were approved by the Office of Management and Budget, | ||
control number 3150-0011. | control number 3150-0011. | ||
5. Radiation Monitoring Instrumentation (71124.05) | |||
Date of Last Inspection: | 5. | ||
A. List of contacts and telephone numbers for the following areas below. Please include | Radiation Monitoring Instrumentation (71124.05) | ||
Date of Last Inspection: | |||
January 23, 2017 | |||
A. | |||
List of contacts and telephone numbers for the following areas below. Please include | |||
area code and prefix. If work cell numbers are appropriate, then please include them as | area code and prefix. If work cell numbers are appropriate, then please include them as | ||
well. | well. | ||
| Line 907: | Line 1,632: | ||
4. Count room and Laboratory instrument calibrations (Include RP and Chemistry, as | 4. Count room and Laboratory instrument calibrations (Include RP and Chemistry, as | ||
applicable) | applicable) | ||
5. EP contacts for Equipment Important to Emergency Response/Preparedness | 5. EP contacts for Equipment Important to Emergency Response/Preparedness | ||
(EITER) | |||
6. Licensing/Regulatory Affairs | 6. Licensing/Regulatory Affairs | ||
B. | |||
Applicable organization charts, including position or job titles. Please include as | |||
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C), | appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C), | ||
Engineering, and Emergency Protection. (Recent pictures are appreciated.) | Engineering, and Emergency Protection. (Recent pictures are appreciated.) | ||
C. | |||
Copies of audits, self-assessments, vendor or NUPIC audits for contractor support, | |||
LARs, and LERs, performed since the date of the last inspection, related to: | LARs, and LERs, performed since the date of the last inspection, related to: | ||
1. Portable Radiation instruments: Area radiation monitors, portable continuous air | 1. Portable Radiation instruments: Area radiation monitors, portable continuous air | ||
| Line 920: | Line 1,647: | ||
2. Stationary Radiation Instruments: Portal monitors, small article monitors, personnel | 2. Stationary Radiation Instruments: Portal monitors, small article monitors, personnel | ||
contamination monitors, or whole body counters | contamination monitors, or whole body counters | ||
3. Installed Radiation Instruments: Area radiation monitors (RMS), process monitors | 3. Installed Radiation Instruments: Area radiation monitors (RMS), process monitors | ||
(non-effluent), criticality monitors, accident monitors | |||
4. Count Room instrumentation (Chemistry and RP, if separate RP Ops and Effluents): | 4. Count Room instrumentation (Chemistry and RP, if separate RP Ops and Effluents): | ||
Gamma Spec, LSC, Gross Alpha, Gross Beta, including bench-top counters | Gamma Spec, LSC, Gross Alpha, Gross Beta, including bench-top counters | ||
D. Procedure indexes for radiation protection procedures and other related disciplines. | D. | ||
Procedure indexes for radiation protection procedures and other related disciplines. | |||
1. Calibration, use, and operation of continuous air monitors, portable survey | 1. Calibration, use, and operation of continuous air monitors, portable survey | ||
instruments, temporary area radiation monitors, electronic dosimeters, teledosimetry | instruments, temporary area radiation monitors, electronic dosimeters, teledosimetry | ||
| Line 931: | Line 1,659: | ||
3. Calibration of installed area radiation monitors, process monitors, criticality monitors, | 3. Calibration of installed area radiation monitors, process monitors, criticality monitors, | ||
and accident monitors | and accident monitors | ||
4. Calibration use and operation of Count Room instrumentation (GS, LSC, GA, GB) | 4. Calibration use and operation of Count Room instrumentation (GS, LSC, GA, GB) | ||
(include bench top counters here) | |||
NOTE: Please ensure that RP, Chemistry, and I&C procedures are included, as | NOTE: Please ensure that RP, Chemistry, and I&C procedures are included, as | ||
appropriate. | appropriate. | ||
E. Please provide specific procedures related to the following areas noted below. | E. | ||
Please provide specific procedures related to the following areas noted below. | |||
Additional procedures may be requested by number after the inspector reviews the | Additional procedures may be requested by number after the inspector reviews the | ||
procedure index. | procedure index. | ||
1. Calibration of portable ion chambers | 1. Calibration of portable ion chambers | ||
2. Calibration of Friskers | 2. Calibration of Friskers | ||
3. Calibration of telescoping high range instruments | 3. Calibration of telescoping high range instruments | ||
4. Calibration of portable neutron instruments | 4. Calibration of portable neutron instruments | ||
5. Calibration of SAMs | 5. Calibration of SAMs | ||
| Line 946: | Line 1,676: | ||
7. Laboratory instrumentation quality control | 7. Laboratory instrumentation quality control | ||
8. Calibration of Containment/Drywell high range radiation monitor | 8. Calibration of Containment/Drywell high range radiation monitor | ||
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently | F. | ||
Please provide a list of NRC Regulatory Guides and NUREGs that you are currently | |||
committed to relative to this program. Please include the revision and/or date for the | committed to relative to this program. Please include the revision and/or date for the | ||
commitment and where this may be located in your current licensing basis documents. | commitment and where this may be located in your current licensing basis documents. | ||
G. Please provide a summary list of corrective action documents (including corporate and | G. | ||
Please provide a summary list of corrective action documents (including corporate and | |||
sub-tiered systems) written since the date of the last inspection, related to the following | sub-tiered systems) written since the date of the last inspection, related to the following | ||
programs: | programs: | ||
| Line 966: | Line 1,698: | ||
needed. (Excel spreadsheets are the preferred format.) If codes are used, | needed. (Excel spreadsheets are the preferred format.) If codes are used, | ||
please provide a legend for each column where a code is used. | please provide a legend for each column where a code is used. | ||
H. State the required calibration frequency and provide the most recent calibration data for | H. | ||
State the required calibration frequency and provide the most recent calibration data for | |||
the whole body counters, at least one portable survey instrument, one area radiation | the whole body counters, at least one portable survey instrument, one area radiation | ||
monitor, one air sampler, one continuous air monitor, and one drywell/containment high- | monitor, one air sampler, one continuous air monitor, and one drywell/containment high- | ||
range monitor. | range monitor. | ||
I. | |||
Provide a list of any scheduled calibrations, while we are onsite, for the instrumentation | |||
noted in request above, in 5-I. | noted in request above, in 5-I. | ||
J. Provide the alarm set point values for the portal and personnel contamination monitors in | J. | ||
Provide the alarm set point values for the portal and personnel contamination monitors in | |||
operation. | operation. | ||
K. Radiation Monitoring System health report for the previous 12 months | K. | ||
Radiation Monitoring System health report for the previous 12 months | |||
L. | |||
Provide the following lists of instruments to include make, model, identifier (S/N or plant | |||
ID), and location: | ID), and location: | ||
1. Portable radiation instruments currently in use (for EADs just make, model, and | 1. Portable radiation instruments currently in use (for EADs just make, model, and | ||
| Line 982: | Line 1,719: | ||
3. Installed Radiation monitors | 3. Installed Radiation monitors | ||
a. Area radiation monitors and | a. Area radiation monitors and | ||
b. Process radiation monitors. | b. Process radiation monitors. | ||
(Include their instrumentation designator, function and calibration procedure | |||
number and title.) Please indicate which, if any, detectors have been | number and title.) Please indicate which, if any, detectors have been | ||
replaced within the past 2 years (since the last inspection). | replaced within the past 2 years (since the last inspection). | ||
c. Radiation instrumentation abandoned in place. | c. Radiation instrumentation abandoned in place. | ||
d. Radiation instrumentation covered by the maintenance rule. | d. Radiation instrumentation covered by the maintenance rule. | ||
M. | |||
Provide a list of sources used routinely for source check of portable, stationary, and | |||
installed radiation monitoring instruments. | installed radiation monitoring instruments. | ||
N. Provide the NIST traceability and calibration or verification of the primary sources for | N. | ||
Provide the NIST traceability and calibration or verification of the primary sources for | |||
instrument calibration and the procedures used to achieve this. | instrument calibration and the procedures used to achieve this. | ||
6. Radioactive Gaseous and Liquid Effluent Treatment (71124.06) | 6. | ||
Date of Last Inspection: | Radioactive Gaseous and Liquid Effluent Treatment (71124.06) | ||
A. List of contacts and telephone numbers for the following areas. Please include area | Date of Last Inspection: | ||
January 23, 2017 | |||
A. | |||
List of contacts and telephone numbers for the following areas. Please include area | |||
code and prefix. If work cell numbers are appropriate, then please include them as well. | code and prefix. If work cell numbers are appropriate, then please include them as well. | ||
1. Radiological effluent control (liquid & gaseous) and reporting | 1. Radiological effluent control (liquid & gaseous) and reporting | ||
(RP, Chemistry, RW, Ops, etc.) | |||
2. Effluent Monitor calibration (liquid and gaseous) and maintenance | 2. Effluent Monitor calibration (liquid and gaseous) and maintenance | ||
(RP, Chemistry, I&C, Maintenance, Systems Engineering, EP, etc.) | |||
3. Engineered safety feature air cleaning systems for effluent release | 3. Engineered safety feature air cleaning systems for effluent release | ||
(Systems Engineering, I&C, Maintenance, etc.) | |||
4. Licensing/Regulatory Affairs | 4. Licensing/Regulatory Affairs | ||
B. Applicable organization charts including position or job titles for the above individuals | B. | ||
Applicable organization charts including position or job titles for the above individuals | |||
and also for their supportive Management. Please include as appropriate for your site, | and also for their supportive Management. Please include as appropriate for your site, | ||
Site Management, RP, Chemistry, Maintenance (I&C), Engineering, and Emergency | Site Management, RP, Chemistry, Maintenance (I&C), Engineering, and Emergency | ||
Protection. (Recent pictures are appreciated.) | Protection. (Recent pictures are appreciated.) | ||
C. | |||
Copies of audits, self-assessments, vendor or NUPIC audits of contractor support, and | |||
LERs written since the date of the last inspection, related to: | LERs written since the date of the last inspection, related to: | ||
1. Radioactive effluents and effluent radiation monitors | 1. Radioactive effluents and effluent radiation monitors | ||
2. Engineered Safety Feature Air cleaning systems | 2. Engineered Safety Feature Air cleaning systems | ||
D. Procedure indexes for the following areas and related disciplines. | |||
D. | |||
Procedure indexes for the following areas and related disciplines. | |||
1. Radioactive effluents and effluent radiation monitors (to include the flow monitors) | 1. Radioactive effluents and effluent radiation monitors (to include the flow monitors) | ||
2. Engineered Safety Feature Air cleaning systems (both TS and non-TS systems for | 2. Engineered Safety Feature Air cleaning systems (both TS and non-TS systems for | ||
effluents) | effluents) | ||
E. Please provide specific procedures related to the following areas noted below. | E. | ||
Please provide specific procedures related to the following areas noted below. | |||
Additional procedures may be requested by number after the inspector reviews the | Additional procedures may be requested by number after the inspector reviews the | ||
procedure indexes. | procedure indexes. | ||
| Line 1,024: | Line 1,772: | ||
5. Laboratory instrumentation quality control | 5. Laboratory instrumentation quality control | ||
6. In-place testing of HEPA filters and charcoal adsorbers for TS effluent exhaust | 6. In-place testing of HEPA filters and charcoal adsorbers for TS effluent exhaust | ||
systems and other effluent air-cleaning systems, but not breathing air systems | systems and other effluent air-cleaning systems, but not breathing air systems | ||
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently | |||
F. | |||
Please provide a list of NRC Regulatory Guides and NUREGs that you are currently | |||
committed to relative to this program. Please include the revision and/or date for the | committed to relative to this program. Please include the revision and/or date for the | ||
commitment and where this may be located in your current licensing basis documents. | commitment and where this may be located in your current licensing basis documents. | ||
G. Please provide a summary list of corrective action documents (including corporate and | G. | ||
Please provide a summary list of corrective action documents (including corporate and | |||
sub-tiered systems) written since the date of the last inspection, associated with: | sub-tiered systems) written since the date of the last inspection, associated with: | ||
1. Radioactive effluents | 1. Radioactive effluents | ||
| Line 1,041: | Line 1,792: | ||
needed. (Excel spreadsheets are the preferred format.) If codes are used, | needed. (Excel spreadsheets are the preferred format.) If codes are used, | ||
please provide a legend for each column where a code is used. | please provide a legend for each column where a code is used. | ||
H. Annual Radioactive Effluent Release Reports for the latest two calendar years | H. | ||
Annual Radioactive Effluent Release Reports for the latest two calendar years | |||
I. | |||
Current revision of the Offsite Dose Calculation Manual (or other name, but include all | |||
parts for effluents) and any changes made since the last inspection. | parts for effluents) and any changes made since the last inspection. | ||
J. The inter-laboratory comparison results for laboratory quality control performance of | J. | ||
The inter-laboratory comparison results for laboratory quality control performance of | |||
effluent sample analysis for the latest two calendar years | effluent sample analysis for the latest two calendar years | ||
K. Effluent sampling schedule for the week of the inspection | K. | ||
Effluent sampling schedule for the week of the inspection | |||
M. Operations department (or other responsible dept.) log records for effluent monitors | L. | ||
Provide the last three annual trends of vent/stack effluent flow rates, by chart or table. | |||
M. | |||
Operations department (or other responsible dept.) log records for effluent monitors | |||
removed from service or out of service or a list of the same and compensatory actions | removed from service or out of service or a list of the same and compensatory actions | ||
taken during the out of service condition. | taken during the out of service condition. | ||
N. Listing or log of liquid and gaseous release permits since the date of the last inspection | N. | ||
O. A list of the technical specification-required air cleaning systems with the two most | Listing or log of liquid and gaseous release permits since the date of the last inspection | ||
O. | |||
A list of the technical specification-required air cleaning systems with the two most | |||
recent surveillance test dates of in-place filter testing (of HEPA filters and charcoal | recent surveillance test dates of in-place filter testing (of HEPA filters and charcoal | ||
adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers | adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers | ||
associated with the surveillances (and their system number/name). | associated with the surveillances (and their system number/name). | ||
P. | |||
System Health Report for radiation monitoring instrumentation. Also, please provide a | |||
specific list of all effluent radiation monitors that were considered inoperable for 7 days | specific list of all effluent radiation monitors that were considered inoperable for 7 days | ||
or more since the date of the last inspection. If applicable, please provide the relative | or more since the date of the last inspection. If applicable, please provide the relative | ||
Special Report and condition report(s). If not covered by maintenance rule, please | Special Report and condition report(s). If not covered by maintenance rule, please | ||
provide rationale. | provide rationale. | ||
Q. A list of significant changes made to the gaseous and liquid effluent process monitoring | Q. | ||
A list of significant changes made to the gaseous and liquid effluent process monitoring | |||
system since the date of the last inspection. If applicable, please provide the | system since the date of the last inspection. If applicable, please provide the | ||
corresponding UFSAR section in which this change was documented. | corresponding UFSAR section in which this change was documented. | ||
R. A list of any occurrence in which a non-radioactive system was contaminated by a | |||
R. | |||
A list of any occurrence in which a non-radioactive system was contaminated by a | |||
radioactive system since the date of the last inspection. Please include any relevant | radioactive system since the date of the last inspection. Please include any relevant | ||
condition report(s). | condition report(s). | ||
S. Current Part 61 analyses for hard to detect radionuclides | S. | ||
T. Latest Land Use Census (coordinate with 71124.07) | Current Part 61 analyses for hard to detect radionuclides | ||
U. Effluent based procedures for EALs or EOPs. | T. | ||
7. Radiological Environmental Monitoring Program (71124.07) | Latest Land Use Census (coordinate with 71124.07) | ||
Date of Last Inspection: | U. | ||
A. List of contacts and telephone numbers for the following areas. Please include area | Effluent based procedures for EALs or EOPs. | ||
7. | |||
Radiological Environmental Monitoring Program (71124.07) | |||
Date of Last Inspection: | |||
January 23, 2017 | |||
A. | |||
List of contacts and telephone numbers for the following areas. Please include area | |||
code and prefix. If work cell numbers are appropriate, then please include them as well. | code and prefix. If work cell numbers are appropriate, then please include them as well. | ||
1. Radiological environmental monitoring (RP, Chemistry, I&C, etc.) | 1. Radiological environmental monitoring (RP, Chemistry, I&C, etc.) | ||
| Line 1,078: | Line 1,847: | ||
3. Maintenance and calibration of the above equipment | 3. Maintenance and calibration of the above equipment | ||
4. Licensing/Regulatory Affairs | 4. Licensing/Regulatory Affairs | ||
B. Applicable organization charts including position or job titles. Please include as | B. | ||
Applicable organization charts including position or job titles. Please include as | |||
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C), | appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C), | ||
Engineering, and Emergency Protection. (Recent pictures are appreciated.) | Engineering, and Emergency Protection. (Recent pictures are appreciated.) | ||
C. | |||
Copies of audits, self-assessments, vendor or NUPIC audits of contractor support, and | |||
LERs written since the date of the last inspection, related to: | LERs written since the date of the last inspection, related to: | ||
1. Radiological environmental monitoring program (including contractor environmental | 1. Radiological environmental monitoring program (including contractor environmental | ||
| Line 1,087: | Line 1,858: | ||
2. Environmental TLD processing facility | 2. Environmental TLD processing facility | ||
3. Meteorological monitoring program | 3. Meteorological monitoring program | ||
D. Procedure index for the following areas and other related disciplines. | D. | ||
Procedure index for the following areas and other related disciplines. | |||
1. Radiological environmental monitoring program | 1. Radiological environmental monitoring program | ||
2. Meteorological monitoring program | 2. Meteorological monitoring program | ||
3. Maintenance and calibration of related instrumentation, including the meteorological | 3. Maintenance and calibration of related instrumentation, including the meteorological | ||
tower | tower | ||
E. Please provide specific procedures related to the following areas noted below. | E. | ||
Please provide specific procedures related to the following areas noted below. | |||
Additional procedures may be requested by number after the inspector reviews the | Additional procedures may be requested by number after the inspector reviews the | ||
procedure indexes. | procedure indexes. | ||
| Line 1,099: | Line 1,872: | ||
3. Laboratory instrumentation quality control | 3. Laboratory instrumentation quality control | ||
4. Meteorological Tower sensor calibrations | 4. Meteorological Tower sensor calibrations | ||
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently | F. | ||
Please provide a list of NRC Regulatory Guides and NUREGs that you are currently | |||
committed to relative to this program. Please include the revision and/or date for the | committed to relative to this program. Please include the revision and/or date for the | ||
commitment and where this may be located in your current licensing basis documents. | commitment and where this may be located in your current licensing basis documents. | ||
G. Please provide a summary list of corrective action documents (including corporate and | |||
G. | |||
Please provide a summary list of corrective action documents (including corporate and | |||
sub-tiered systems) written since the date of the last inspection, related to the following | sub-tiered systems) written since the date of the last inspection, related to the following | ||
programs: | programs: | ||
| Line 1,116: | Line 1,892: | ||
needed. (Excel spreadsheets are the preferred format.) If codes are used, | needed. (Excel spreadsheets are the preferred format.) If codes are used, | ||
please provide a legend for each column where a code is used. | please provide a legend for each column where a code is used. | ||
H. Copies of the two most recent calibration packages for the meteorological tower | H. | ||
Copies of the two most recent calibration packages for the meteorological tower | |||
instruments | instruments | ||
I. Copies of the Annual Radiological Environmental Operating Reports and Land Use | I. | ||
Copies of the Annual Radiological Environmental Operating Reports and Land Use | |||
Census for the latest two calendar years, and current revision of the Offsite Dose | Census for the latest two calendar years, and current revision of the Offsite Dose | ||
Calculation Manual. Please include any supportive documentation for the changes | Calculation Manual. Please include any supportive documentation for the changes | ||
made to the ODCM since the last inspection. | made to the ODCM since the last inspection. | ||
J. Copy of the environmental laboratorys inter-laboratory comparison program results for | J. | ||
Copy of the environmental laboratorys inter-laboratory comparison program results for | |||
the latest two calendar years, if not included in the Annual Radiological Environmental | the latest two calendar years, if not included in the Annual Radiological Environmental | ||
Operating Report | Operating Report | ||
K. Data from the environmental laboratory documenting the analytical detection sensitivities | K. | ||
Data from the environmental laboratory documenting the analytical detection sensitivities | |||
for the various environmental sample media (i.e., air, water, soil, vegetation, and milk) | for the various environmental sample media (i.e., air, water, soil, vegetation, and milk) | ||
L. | |||
M. Current NEI Groundwater Protection Initiative (GPI) Plan and status. Provide the most | Quality Assurance audits (e.g., NUPIC) for contracted services | ||
M. | |||
Current NEI Groundwater Protection Initiative (GPI) Plan and status. Provide the most | |||
recent monitoring results for each monitoring well per the GPI. Provide a separate list of | recent monitoring results for each monitoring well per the GPI. Provide a separate list of | ||
any missed samples, as applicable. | any missed samples, as applicable. | ||
N. Technical requirements manual or licensee controlled specifications which list the | N. | ||
Technical requirements manual or licensee controlled specifications which list the | |||
meteorological instruments calibration requirements | meteorological instruments calibration requirements | ||
O. | |||
If applicable, per NEI 07-07, provide any reports that document any spills/leaks to | |||
groundwater since the date of the last inspection. Please indicate what external | groundwater since the date of the last inspection. Please indicate what external | ||
communications were made regarding each spill/leak. | communications were made regarding each spill/leak. | ||
P. Provide any new entries into 10 CFR 50.75(g) files since the date of the last inspection. | P. | ||
Provide any new entries into 10 CFR 50.75(g) files since the date of the last inspection. | |||
Q. | |||
Please identify your three highest X/Q (chi/Q) and/or D/Q sectors, as currently used in | |||
the selection of your required REMP sampling locations. If these are different values | the selection of your required REMP sampling locations. If these are different values | ||
from your most recent meteorological assessment, please provide that assessment and | from your most recent meteorological assessment, please provide that assessment and | ||
indicate the three highest X/Q and/or D/Q sectors per your latest assessment. Also | indicate the three highest X/Q and/or D/Q sectors per your latest assessment. Also | ||
indicate your noted predominant and least prevalent wind direction/sector, as used in | indicate your noted predominant and least prevalent wind direction/sector, as used in | ||
your REMP analysis. | your REMP analysis. | ||
R. Provide the height of the highest effluent release point. Please indicate if the height | |||
R. | |||
Provide the height of the highest effluent release point. Please indicate if the height | |||
accounts for plant grade elevation. Please also provide the most probable atmospheric | accounts for plant grade elevation. Please also provide the most probable atmospheric | ||
release height, if different from the highest effluent release point. | release height, if different from the highest effluent release point. | ||
S. | |||
Please provide a schedule of any planned REMP sampling activities while we, the NRC, | |||
are scheduled to be onsite performing this inspection. | are scheduled to be onsite performing this inspection. | ||
8. Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage, | 8. | ||
Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage, | |||
and Transportation (71124.08) | and Transportation (71124.08) | ||
Date of Last Inspection: | Date of Last Inspection: | ||
A. List of contacts and telephone numbers for the following areas. Please include area | January 23, 2017 | ||
A. | |||
List of contacts and telephone numbers for the following areas. Please include area | |||
code and prefix. If work cell numbers are appropriate, then please include them as well. | code and prefix. If work cell numbers are appropriate, then please include them as well. | ||
1. Solid Radioactive waste processing (RP, Chemistry, Ops, Maintenance, I&C, | 1. Solid Radioactive waste processing (RP, Chemistry, Ops, Maintenance, I&C, | ||
| Line 1,160: | Line 1,952: | ||
radioactive waste/materials) | radioactive waste/materials) | ||
4. Licensing/Regulatory Affairs | 4. Licensing/Regulatory Affairs | ||
B. Applicable organization charts including position or job titles. Please include as | B. | ||
Applicable organization charts including position or job titles. Please include as | |||
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C), | appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C), | ||
Engineering, and Emergency Protection. (Recent pictures are appreciated.) | Engineering, and Emergency Protection. (Recent pictures are appreciated.) | ||
C. | |||
Copies of audits, department self-assessments, and LERs written since the date of the | |||
last inspection, related to: | last inspection, related to: | ||
1. Solid radioactive waste management | 1. Solid radioactive waste management | ||
2. Radioactive material/waste transportation program | 2. Radioactive material/waste transportation program | ||
D. Procedure index for the following areas and other related disciplines. | D. | ||
Procedure index for the following areas and other related disciplines. | |||
1. Solid radioactive waste management | 1. Solid radioactive waste management | ||
2. Radioactive material/waste transportation | 2. Radioactive material/waste transportation | ||
E. Please provide specific procedures related to the following areas noted below. | E. | ||
Please provide specific procedures related to the following areas noted below. | |||
Additional procedures may be requested by number after the inspector reviews the | Additional procedures may be requested by number after the inspector reviews the | ||
procedure indexes. | procedure indexes. | ||
| Line 1,178: | Line 1,974: | ||
4. Waste characterization and classification | 4. Waste characterization and classification | ||
5. Radioactive material/waste packaging & shipping | 5. Radioactive material/waste packaging & shipping | ||
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently | F. | ||
Please provide a list of NRC Regulatory Guides and NUREGs that you are currently | |||
committed to relative to this program. Please include the revision and/or date for the | committed to relative to this program. Please include the revision and/or date for the | ||
commitment and where this may be located in your current licensing basis documents. | commitment and where this may be located in your current licensing basis documents. | ||
G. Please provide a summary list of corrective action documents (including corporate and | G. | ||
sub-tiered systems) written since the date of the last inspection, related to: | Please provide a summary list of corrective action documents (including corporate and | ||
sub-tiered systems) written since the date of the last inspection, related to: | |||
1. Solid radioactive waste | 1. Solid radioactive waste | ||
2. Transportation of radioactive material/waste | 2. Transportation of radioactive material/waste | ||
| Line 1,193: | Line 1,992: | ||
needed. (Excel spreadsheets are the preferred format.) If codes are used, | needed. (Excel spreadsheets are the preferred format.) If codes are used, | ||
please provide a legend for each column where a code is used. | please provide a legend for each column where a code is used. | ||
H. | |||
Copies of training lesson plans for 49 CFR 172, Subpart H, for radwaste processing, | |||
packaging, and shipping | packaging, and shipping | ||
I. Provide a summary list or log of radioactive material and radioactive waste shipments for | I. | ||
Provide a summary list or log of radioactive material and radioactive waste shipments for | |||
the two most recent calendar years, in addition to the current calendar year. | the two most recent calendar years, in addition to the current calendar year. | ||
J. Please provide at least two different radioactive waste stream sample analysis results | J. | ||
Please provide at least two different radioactive waste stream sample analysis results | |||
and resulting scaling factors for the latest two calendar years. | and resulting scaling factors for the latest two calendar years. | ||
K. A listing of all onsite radwaste storage facilities. Please include a summary or list of the | K. | ||
A listing of all onsite radwaste storage facilities. Please include a summary or list of the | |||
items stored in each facility with the most recent dose rates/surveys. | items stored in each facility with the most recent dose rates/surveys. | ||
L. | |||
A list of any significant (e.g., DAW, resins, Type B or greater) radioactive shipments that | |||
will be completed during our onsite inspection period. If available, please provide the | will be completed during our onsite inspection period. If available, please provide the | ||
applicable shipping manifests/waste characterizations and most recent surveys for each | applicable shipping manifests/waste characterizations and most recent surveys for each | ||
shipment. | shipment. | ||
M. A list of significant changes made to the liquid or solid radwaste processing systems | M. | ||
A list of significant changes made to the liquid or solid radwaste processing systems | |||
since the date of the last inspection. If applicable, please provide the corresponding | since the date of the last inspection. If applicable, please provide the corresponding | ||
UFSAR section in which this change was documented. Provide any supportive | UFSAR section in which this change was documented. Provide any supportive | ||
documentation for the changes made or have it readily available for review. | documentation for the changes made or have it readily available for review. | ||
N. List of radioactive waste processing systems or equipment abandoned in place since the | N. | ||
List of radioactive waste processing systems or equipment abandoned in place since the | |||
last inspection. | last inspection. | ||
O. Please provide a schedule of radioactive material or waste processing or shipment | O. | ||
Please provide a schedule of radioactive material or waste processing or shipment | |||
activities during the inspection week. Please indicate the current storage location of the | activities during the inspection week. Please indicate the current storage location of the | ||
stored RAM or waste prepared for shipment, as well as any supportive surveys of its | stored RAM or waste prepared for shipment, as well as any supportive surveys of its | ||
measured dose rates. If available, please indicate its current stated waste class. | measured dose rates. If available, please indicate its current stated waste class. | ||
ML19122A295 | ML19122A295 | ||
SUNSI Review: | SUNSI Review: | ||
By: JDixon | ADAMS: | ||
OFFICE | Non-Publicly Available | ||
NAME | Non-Sensitive | ||
SIGNATURE | Keyword: | ||
DATE | By: JDixon | ||
OFFICE | Yes No | ||
NAME | Publicly Available | ||
SIGNATURE | Sensitive | ||
DATE | OFFICE | ||
DRP/SRI | |||
DRP/RI | |||
DRP/RI | |||
DRP/RI | |||
C:DRS/EB1 | |||
C:DRS/EB2 | |||
NAME | |||
CPeabody | |||
DReinert | |||
DYou | |||
RBywater | |||
VGaddy | |||
GPick | |||
SIGNATURE | |||
CAP | |||
DRR | |||
DDY | |||
RLB | |||
vgg | |||
GAP | |||
DATE | |||
4/24/2019 | |||
4/29/2019 | |||
4/25/2019 | |||
4/24/2019 | |||
4/25/2019 | |||
4/25/2019 | |||
OFFICE | |||
C:DRS/OB | |||
C:DNMS/RIB | |||
TL:IPAT | |||
C:DRS/RCB | |||
C:DRP/D | |||
NAME | |||
GWerner | |||
GWarnick | |||
RKellar | |||
NMakris | |||
NOKeefe | |||
SIGNATURE | |||
GEW | |||
JFK for | |||
RLK | |||
NM | |||
NFO | |||
DATE | |||
04/25/2019 | |||
4/30/2019 | |||
4/25/2019 | |||
4/25/2019 | |||
4/30/2019 | |||
}} | }} | ||
Latest revision as of 02:43, 5 January 2025
| ML19122A295 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/30/2019 |
| From: | O'Keefe N NRC/RGN-IV/DRP |
| To: | Bement R Arizona Public Service Co |
| References | |
| IR 2019001 | |
| Download: ML19122A295 (41) | |
Text
April 30, 2019
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000528/2019001, 05000529/2019001, 05000530/2019001, AND 07200044/2019001
Dear Mr. Bement:
On March 31, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Palo Verde Nuclear Generating Station Units 1, 2, and 3 and on April 12, 2019, discussed the results of this inspection with Mr. Jack Cadogan, Senior Vice President, Site Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Neil F. OKeefe, Chief Project Branch D Division of Reactor Projects
Docket Nos. 05000528, 05000529, 05000530, and 07200044
License Nos. NPF-41, NPF-51, NPF-74
Enclosure:
Inspection Report 05000528/2019001, 05000529/2019001, 05000530/2019001, and 07200044/2019001 w/attachments:
1. Supplemental Information 2. Information Request
Enclosure U.S. NUCLEAR REGULATORY COMMISSION
Inspection Report
Docket Number(s):
05000528, 05000529, 05000530, and 07200044
License Number(s):
Report Number(s):
05000528/2019001, 05000529/2019001, 05000530/2019001, and
07200044/2019001
Enterprise Identifier: I-2019-001-0013
I-2019-001-0077
Licensee:
Arizona Public Service Co.
Facility:
Palo Verde Nuclear Generating Station and Independent Spent Fuel
Storage Installation
Location:
5801 South Wintersburg Road, Tonopah, AZ 85354
Inspection Dates:
January 1, 2019, to March 31, 2019
Inspectors:
C. Peabody, Senior Resident Inspector
D. Reinert, Resident Inspector
D. You, Resident Inspector
R. Bywater, Resident Inspector
R. Alexander, Senior Project Engineer
L. Carson, Senior Health Physicist
P. Elkmann, Senior Emergency Preparedness Inspector
N. Greene, PhD, Senior Health Physicist
S. Hedger, Emergency Preparedness Inspector
J. O'Donnell, Health Physicist
C. Alldredge, Allegations/Enforcement Specialist
B. Baca, Health Physicist
O. Masnyk Bailey, Health Physicist (Region I)
K. Warner, Health Physicist, (Region I)
Approved By:
Neil OKeefe, Chief,
Project Branch D,
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting baseline inspections at Palo Verde Nuclear Generating Station Units 1, 2, and 3 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
NRC-identified and self-revealed findings, violations, and additional items are summarized in the table below. Licensee-identified non-cited violations are documented in the Inspection Results at the end of this report.
List of Findings and Violations
No findings were identified.
Additional Tracking Items
None.
PLANT STATUS
Units 1, 2, and 3 operated at or near full power for the duration of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Seasonal Extreme Weather Sample (IP Section 03.02) (1 Sample)
The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of extreme high temperatures.
71111.04 - Equipment Alignment
Partial Walkdown (IP Section 02.01) (3 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 3 containment spray system B, on January 24, 2019
- (2) Unit 3 diesel generators A and B jacket water cooling systems, on February 1, 2019
- (3) Unit 3 loss of power sequencer A, on March 22, 2019
71111.05Q - Fire Protection
Quarterly Inspection (IP Section 03.01) (6 Samples)
The inspectors evaluated fire protection program implementation in the following selected areas:
- (1) Unit 3 non-class switchgear and battery rooms, Fire Area TB4, on January 16, 2019
- (2) Unit 2 auxiliary feedwater A room, Fire Area 72, on January 17, 2019
- (3) Unit 1 auxiliary feedwater B room, Fire Area 73, on February 20, 2019
- (4) Unit 3 auxiliary feedwater A room, Fire Area 72, on March 22, 2019
- (5) Unit 1 auxiliary feedwater A room, Fire Area 72, on March 25, 2019
- (6) Unit 1 Class 1E switchgear B room, Fire Area 5B, on March 29, 2019
71111.06 - Flood Protection Measures
Inspection Activities - Internal Flooding (IP Section 02.02a.) (1 Sample)
The inspectors evaluated internal flooding mitigation protections in the 80 and 100 elevations of the Unit 1, 2, and 3 main steam support structures on March 21, 2019.
Inspection Activities - Underground Cables (IP Section 02.02c.) (1 Sample)
The inspectors evaluated cable submergence protection in Unit 3 Bravo diesel fuel oil vault on March 1, 2019.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
The inspectors observed and evaluated Unit 3 control room operators during a maintenance activity to replace power switch assemblies for control element assembly 22 on February 12, 2019.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
The inspectors observed and evaluated a licensed operator continuing training simulator scenario on February 5, 2019. The inspectors assessed the performance of the operators and the control room simulator.
71111.12 - Maintenance Effectiveness
Routine Maintenance Effectiveness Inspection (IP Section 02.01) (2 Samples)
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
- (1) Unit 1 chemical and volume control system charging pump discharge pressure relief valve failures, on January 24, 2019
- (2) Unit 3 essential chilled water temperature control valve ECB-TV0030, on March 21, 2019
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
- (1) Unit 2 elevated risk during station blackout generator and high pressure safety injection pump A maintenance, on January 8, 2019
- (2) Unit 1 emergent work for main feedwater pump B mini-flow valve failure, on February 20, 2019
- (3) Unit 3 online risk during diesel generator A super outage, on March 5, 2019
71111.15 - Operability Determinations and Functionality Assessments
Sample Selection (IP Section 02.01) (6 Samples)
The inspectors evaluated the following operability determinations and functionality assessments:
- (1) Unit 3 spent fuel pool decrease in Boron-10 concentration, on January 25, 2019
- (2) Unit 3 control room essential air handing unit B temperature control valve response to handheld radio interference, on February 14, 2019
- (3) Units 1, 2, and 3 analysis of manual compensatory actions to maintain high pressure safety injection operability and availability during reactor water tank full flow recirculation evolutions, on February 20, 2019
- (4) Unit 2 reactor coolant pump vibration monitoring system, on February 22, 2019
- (5) Unit 2 operability of shutdown cooling loop 1 isolation valve SI-653, on March 21, 2019
- (6) Unit 3 pressurizer level control system tuning issues, on March 26, 2019
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples)
The inspectors evaluated the following temporary or permanent modifications:
- (1) Unit 1 diesel generator A crankcase breather ventilation piping modification DG-1153, on February 28, 2019
- (2) Station blackout generator 1 and 2 modification for permanently adjusting lube oil high pressure alarm set point, on March 20, 2019
71111.19 - Post Maintenance Testing
Post Maintenance Test Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the following post maintenance tests:
- (1) Unit 3 control element assembly power switch assembly test following replacement, on February 12, 2019
- (2) Unit 3 diesel generator B fuel oil transfer pump test following terminal board replacement, on February 21, 2019
- (3) Unit 3 diesel generator A fast start following a diesel super outage, on March 8, 2019
- (4) Unit 3 safety injection valve 615 test following periodic maintenance, on March 19, 2019
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
In Service Testing (IST) (IP Section 03.01)
77ST-9EW01, Unit 1 essential cooling water A inservice pump test, on January 31, 2019
Surveillance Testing (IP Section 03.01) (3 Samples)
- (1) Unit 3 diesel generator A 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> surveillance and hot restart, on January 7, 2019
(2)77ST-9SB19, Unit 1 core protection calculator system channel C functional test, on January 8, 2019
(3)36ST-9SA02, Unit 1 engineered safety features actuation system train B subgroup relay functional testing, on February 21, 2019
71114.06 - Drill Evaluation
Drill and/or Simulator-Based Licensed Operator Requalification Training (IP Section 02.01)
(see 71114.06 for sample guidance)
The inspectors evaluated a dress rehearsal drill that required emergency facilities to respond to a fire in a diesel generator room, a steam generator tube rupture, and a steam line break on February 5, 2019.
71114.08 - Exercise Evaluation Scenario Review
Inspection Review (IP Section 02.01 - 02.04) (1 Sample)
The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on February 11, 2019. This review did not constitute approval of the scenario.
RADIATION SAFETY
71124.05 - Radiation Monitoring Instrumentation
Calibration and Testing Program (IP Section 02.02) (1 Sample)
The inspectors evaluated the calibration and testing program implementation.
Alarm set point and calibration method check of personnel contamination monitors, portal monitors and small article monitors:
- iPCM-12
- SAM-12 Failure to meet calibration or source check acceptance criteria:
- SAC-4
- PNR-4
- MGTM
Walk Downs and Observations (IP Section 02.01) (1 Sample)
The inspectors evaluated radiation monitoring instrumentation during plant walkdowns. The inspector observed the following:
Portable survey instruments:
- BC-4
- SAC-4
- RM-20 (multiple)
- FH40GL
- CM-11
Source check demonstration:
- RM-20
- FH40GL
- SAM-12
Area radiation monitors and continuous air monitors:
- RU-1
- RU-2
- RU-3
- RU-8
- RU-12
- RU-15
- RU-16
- RU-33
- RU-34
- RU-37
- RU-140
- RU-142A-D
- RU-149
- RU-152A
- RU-155D
- RU-158D
Personnel contamination monitors, portal monitors and small article monitors:
- iPCM-12
- PCM-12
- SAM-12
71124.06 - Radioactive Gaseous and Liquid Effluent Treatment
Calibration and Testing Program (Process & Effluent Monitors) (IP Section 02.02) (1 Sample)
The inspectors reviewed the following gaseous and liquid effluent monitor instrument calibrations and tests:
- RU-12, Unit 1 Waste Gas Decay Tank Monitor Calibration
- RU-144, Unit 1 Plant Vent Monitor High Calibration
- RU-143, Unit 2 Plant Vent Monitor Low Calibration
- RU-145, Unit 2 Fuel Building B Vent Exhaust Monitor Low Calibration
- RU-143, Unit 3 Plant Vent Monitor Low Calibration
- RU-146, Unit 3 Fuel Building B Vent Exhaust Monitor High Calibration
Dose Calculations (IP Section 02.05) (1 Sample):
The inspectors reviewed the following liquid and gaseous discharge permits to evaluate public dose calculations:
- Permit 20172058, Unit 2 Refueling Purge
- Permit 20182030, Unit 2 Plant Vent
- Permit 20182103, Unit 2 Fuel Building Vent
- Permit 20181142, Unit 1 Plant Vent
- Permit 20181145, Unit 1 Fuel Building Vent
- Permit 20191015, Unit 1 Fuel Building Vent
- Permit 20192013, Unit 2 Plant Vent
- Permit 20192015, Unit 2 Fuel Building Vent
The inspectors also reviewed the following annual radiological effluent release reports:
Abnormal gaseous or liquid tank discharges:
- CR-2018-14265, Oily Waste Separator Tank Overflow
Instrumentation and Equipment (IP Section 02.04) (1 Sample)
The inspectors reviewed the following radioactive effluent discharge system surveillance test results:
- STWO 4777407, Unit 1 Containment Building Purge Air Filtration Unit
- STWO 4813386, Unit 2 Fuel and Aux Building Essential Air Filtration Unit
- STWO 4836778, Unit 1 Fuel and Aux Building Essential Air Filtration Unit
- STWO 4866355, Unit 3 Fuel and Aux Building Essential Air Filtration Unit
Sampling and Analysis (IP Section 02.03) (1 Sample)
The inspectors reviewed the following radioactive effluent sampling and analysis activities:
- RU-145, Unit 3 Fuel Building Radiation Monitor Filter Change out and Gas Grab Sample
- RU-143, Unit 2 Plant Ventilation Radiation Monitor Filter Change out and Gas Grab Sample
- Unit 2 Primary to Secondary Sampling
Effluent discharges:
- Unit 3 Fuel Building Vent Gas Effluent Discharge Permit
- Unit 2 Plant Vent Gas Effluent Discharge Permit
Walk Downs and Observations (IP Section 02.01) (1 Sample)
The inspectors walked down the following gaseous and liquid radioactive effluent monitoring and filtered ventilation systems to assess the material condition and verify proper alignment according to plant design:
- Unit 2 Plant Vent Radiation Monitoring System
- Unit 3 Plant Vent Radiation Monitoring System
- Unit 3 Fuel Building Radiation Monitoring System
- Unit 3 Fuel Building Ventilation Exhaust System
71124.07 - Radiological Environmental Monitoring Program
Groundwater Protection Initiative (GPI) Implementation (IP Section 02.02) (1 Sample)
The inspectors evaluated the licensee's groundwater monitoring program.
Site Inspection (IP Section 02.01) (1 Sample)
The inspectors evaluated the radiological environmental monitoring program implementation.
Walkdowns and calibration and maintenance record review:
- Air Sampling Station Site 4
The inspectors observed the following environmental sample collections and preparation:
- Sites 4, 6A, 7A, 14A, 15, 17A, 21, 29, 35, and 40
- Goat milk Licensee actions in response to missed sample, inoperable sampler, lost thermoluminescent detector (TLD) or anomalous measurement:
- Air Sample Site 6A
- Milk Sample Site 53
- TLD Site 16
Sampling program for the potential of licensed material entering groundwater
- Reactor Water Makeup Tank
- Reactor Water Tank
- Holdup Tank
- Essential Pipe Density Tunnel
71124.08 - Radioactive Solid Waste Processing and Radioactive Material Handling, Storage,
and Transportation
Radioactive Material Storage (IP Section 02.01)
The inspectors evaluated radioactive material storage in the follow areas:
- Dry Active Waste Processing and Storage (DAWPS) Facility
- Low Level Radioactive Materials Storage Facility (LLRWSF)
Container check (e.g., swelling, leakage and deformation):
- 10-4191 Main Steam Safety Valve container
- 12-0197 Main Steam Safety Valve container
- 14-210H Shipping Cask
- 17-1-044 55 gallon drum of In Core Instruments (ICI's)
- 17-1-045 55 gallon drum of ICIs
- 17-1-046 55 gallon drum of ICIs
- 18-3-097 Sealand Dry Active Waste (DAW)
- 19-2-004 Sealand DAW
- 19-2-007 Intermodal Asphalt
- 19-2-008 Intermodal Asphalt
- 19-3-006 Sealand DAW
Radioactive Waste System Walkdown (IP Section 02.02) (1 Sample)
The inspectors evaluated the following radioactive waste processing systems and processes during plant walkdowns.
Liquid or solid radioactive waste processing systems:
- Dry Active Waste Processing and Storage (DAWPS) Facility
- Low Level Radioactive Materials Storage Facility (LLRWSF)
Radioactive waste resin and/or sludge discharges processes:
- High Integrity Container Receipt, Handling, Use, and Closure
- Self-Engaging Rapid Dewatering Systems (SERDS) Operation
Shipment Preparation (IP Section 02.04) (1 Sample)
The inspectors were not able to evaluate and observe radioactive material shipment preparation processes as no shipments were in process. However, the inspectors reviewed several shipment packages that included surveys, pictures, and assessments in preparation for shipment.
Shipping Records (IP Section 02.05) (1 Sample)
The inspectors evaluated the following non-excepted package shipment records:
- 17-SH-036
- 17-SH-068
- 18-RW-026
- 18-RW-028
- 18-RW-034
- 18-SH-018
- 18-SH-062
Waste Characterization and Classification (IP Section 02.03) (1 Sample)
The inspectors evaluated the radioactive waste characterization and classification for the following waste streams:
- Dry Active Waste streams for Unit 1 (Sample ID: 1-17-042),
Unit 2 (Sample ID: 2-17-014), and Unit 3 (Sample ID: 3-18-040)
- Filter analysis associated with shipping packages 18-RW-026 and 18-RW-028
- Unit 2 waste oil analysis (Sample ID: 2-18-037)
- Resin analysis associated with shipping package 18-SH-062
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===
Units 1, 2, and 3, January 1, 2018-December 31, 2018
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (3 Samples)
Units 1, 2, and 3, January 1, 2018-December 31, 2018 IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (3 Samples)
Units 1, 2, and 3, January 1, 2018-December 31, 2018
MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) (3 Samples)
Units 1, 2, and 3, January 1, 2018-December 31, 2018
Drill/Exercise Performance (IP Section 02.12) (1 Sample)
The inspector reviewed data for the Drill/Exercise Performance indicator for the period January 1, 2018, through December 31, 2018.
ERO Drill Participation (IP Section 02.13) (1 Sample)
The inspector reviewed data for the ERO Participation Performance indicator for the period January 1, 2018, through December 31, 2018.
Alert & Notification System Reliability (IP Section 02.14) (1 Sample)
The inspector reviewed data for the Alert and Notification Performance indicator for the period January 1, 2018, through December 31, 2018.
71152 - Problem Identification and Resolution
Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) Units 1 and 3 control element drive mechanism control system power switch assembly failures
- (2) Unit 1 balance of plant engineered safety features actuation system train A troubleshooting, and replacement of the train A engineered safety features load sequencer module
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
60854 - Preoperational Testing of an Independent Spent Fuel Storage Inspection (ISFSI)
An ISFSI inspection was conducted at PVNGS on March 19-21, 2019, by inspectors from Region I, Division of Nuclear Materials Safety. The PVNGS ISFSI was licensed as a general 10 CFR Part 72 licensee. The licensee had been utilizing the NAC, Universal Multi-Purpose Canister system (UMS), approved under Certificate of Compliance (CoC) 72-1015, Amendment 5, and NAC UMS Final Safety Analysis Report (FSAR), Revision 11, to load and store spent fuel at their ISFSI. At the time of the on-site inspection, PVNGSs ISFSI pad contained 152 NAC ventilated concrete casks (VCCs), each containing the steel Transportable Storage Container (TSC) with a capacity for 24 pressurized water reactor (PWR) spent fuel assemblies. The last routine ISFSI inspection was performed in March 2017 (ADAMS Accession No. ML17130B002).
Under the provisions of 10 CFR 72.210 and 10 CFR 72.212, PVGNS has decided to adopt and utilize a different storage system to store spent fuel casks at their ISFSI. The licensee has elected to utilize the NAC, Magnastor System under CoC 72-1031, Amendment 7, and FSAR Revision 10. The Magnastor TSC has the capacity to store 37 PWR spent fuel assemblies in each VCC.
The purpose of the inspection was to observe and evaluate the licensees pre-operational testing and training exercises required to be performed by a general licensee prior to use of the system to load spent fuel assemblies. The NAC Magnastor CoC 72-1031, Appendix A, Technical Specification (TS) 5.8 contains a list of loading, closure, handling, unloading, and transfer operations that are required to be performed. During the inspection the NRC inspectors observed PVNGS perform the following demonstrations from TS 5.8 (c): closing and sealing of the TSC to demonstrate welding; weld inspection and documentation; and leak testing. PVNGS still has a number of demonstrations that are required to be completed before the licensee can utilize the Magnastor system. Those demonstrations are projected to be performed in the summer of 2019.
The ISFSI activities specifically reviewed during the on-site inspection:
- (1) Evaluated and observed dry run operations which included welding, weld inspection and documentation, and leak testing in accordance with TS 5.8 (c).
- (2) Reviewed welder qualification program, welder performance qualifications, welding procedure specifications, and welding procedure qualification records.
- (3) Reviewed NDE program procedure, NDE personnel certification records, the qualification program for visual test and liquid penetrant exams, liquid penetrant procedure, visual testing procedure, and helium leak testing procedure.
- (4) Review Certified Material Test reports for liquid penetrant chemicals and welder filler metals.
- (5) Evaluated and observed licensees radiation protection implementation during the dry run observations.
- (6) Evaluated and observed licensees implementation of foreign material exclusion program during welding demonstrations.
The inspectors did not identify any issues of concern requiring documentation.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
On February 8, 2019, the inspector presented the baseline radiation safety inspection results to Mr. J. Cadogan, Senior Vice President of Site Operations, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.
On March 21, 2019, the inspectors presented the results from the ISFSI pre-operational welding demonstration inspection to Ms. Maria Lacal, Senior Vice President of Regulatory Oversight, and other members of the licensee staff. Licensee personnel acknowledged the information presented. The inspectors confirmed that proprietary information was controlled to protect from public disclosure.
On April 12, 2019, the inspector presented the quarterly resident inspector inspection results to Mr. Jack Cadogan, Senior Vice President, Site Operations, and other members of the licensee staff. The inspectors confirmed that proprietary information was controlled to protect from public disclosure.
DOCUMENTS REVIEWED
71111.01Adverse Weather Protection
Procedures
Number
Title
Revision
Hot Weather Protection
Site Building HVAC
Calculations
Number
Title
Revision
13-MC-SP-0307
SP/EW System Thermal Performance Design Bases
Analysis
71111.04Equipment Alignment
Condition Reports
17-02911
Work Orders
2711244
2781196
Procedures
Number
Title
Revision
Train A LPSI and CS System Alignment Verification
Drawings
Number
Title
Revision
13-M-DGP-0001
P & I Diagram Diesel Generator System
71111.05AQFire Protection Annual/Quarterly
Miscellaneous Documents
Revision
or Date
Number
Title
PVGS Pre-Fire Strategies Manual
13-MC-ZA-0808
MSSS Flooding At Elevation 81
Fire Protection Database Detailed Report
05/09/1998
PVNGS Safety Evaluation Report
71111.06Flood Protection Measures
Condition Reports
19-02890
19-02658
19-02418
19-02625
Procedures
Number
Title
Revision
Auxiliary Building Station Rounds
Panel B02B Alarm Response
Radwaste Facility Sumps and Drains
Drawings
Number
Title
Revision
01-M-RDP-002
Radioactive Waste Drain System
2-M-RDP-002
Radioactive Waste Drain System
03-M-RDP-002
Radioactive Waste Drain System
Miscellaneous Documents
Revision
or Date
Number
Title
Pre-Fire Strategies Manual
13-MC-ZA-0808
MSSS Flooding at Elevation 81
PO EDC-2019-
00144
Revise Calculation 13-MC-ZA-0808
03/01/2019
71111.11Licensed Operator Requalification Program and Licensed Operator Performance
Procedures
Number
Title
Revision
Conduct of Operations
Management of Critical Evolutions and Infrequently
Performed Test or Evolutions
Miscellaneous Documents
Date
Number
Title
Licensed Operator Continuing Training Simulator
Evaluation Scenario
2/05/2019
71111.12Maintenance Effectiveness
Condition Reports
18-16615
18-02240
18-01811
19-02330
19-02133
18-10880
18-10879
19-02364
Work Orders
4441828
4441462
Miscellaneous Documents
Number
Title
Date
19-02330-006
Engineering Evaluation
2/21/2019
Palo Verde Maintenance Rule Database
71111.13Maintenance Risk Assessments and Emergent Work Control
Condition Reports
16-15545
Procedures
Number
Title
Revision
Operations Department Online Nuclear Risk
Management in Modes 1 and 2
Assessment and Management of Risk When Performing
Maintenance
Protected Equipment
Miscellaneous Documents
Number
Title
Date
EOOS 4.1
Schedulers Evaluation for Palo Verde Unit 1
2/21/2019 09:41
EOOS 4.1
Schedulers Evaluation for Palo Verde Unit 3
03/05/2019
71111.15Operability Determinations and Functionality Assessments
Condition Reports
18-16665
17-04204
18-18476
19-02567
19-02330
19-01290
18-17794
19-01962
19-01941
14-00853
19-04380
19-04382
Work Orders
5071741
Procedures
Number
Title
Revision
Operations Condition Reporting Process and Operability
Determination / Functionality Assessment
Engineering Preventive Maintenance Program
Procedures
Number
Title
Revision
Loose Parts and Vibration Monitoring
Ultrasonic Examination of Reactor Coolant Pump Shafts 7
Reactor Coolant Pump Sulzer Bingham Seal
Replacement
Pressurizer Level Control System Tuning
Miscellaneous Documents
Revision
or Date
Number
Title
18-17794-004
Level 2 Cause Analysis Report
TR-100491
EPRI: UPS Maintenance and Application Guide
Design Basis Manual: Safety Injection System
CRAI 3245187
Evaluation of the Class-1E and PK Inverters and
Associated Subcomponents
CRDR 3300933
Year SCR Replacement for PN and PK Inverters
RCTSAI 4524360
RCP Vibration Monitoring
04/17/2014
RCTSAI 4524358
RCP Shaft Ultrasonic Inspection Following Seal
Replacement
04/17/2014
RCTS 4524352
RCP Vibration Monitoring and Shaft UT Inspections
04/18/2014
PVAR 4524366
Actions for License Amendments 84, 72, and 56
04/17/2014
71111.18Plant Modifications
Condition Reports
16-19472
19-02927
14-00965
18-04376
Work Orders
3094267
4805058
Miscellaneous Documents
Number
Title
Revision
S-19-0005
CFR 50.59 Screening/Evaluation
18-04376-004
Design Equivalent Change Package: TMOD SBOG#!
Lube Oil High Pressure Alarm Set point Schedule
Adjustment
71111.19Post Maintenance Testing
Condition Reports
16-03732
19-03482
19-04033
Work Orders
5103635
4945749
4498502
4507037
4752532
5055992
5076980
4960255
5085998
Procedures
Number
Title
Revision
Diesel Fuel Oil Storage and Transfer
Diesel Fuel Oil Transfer Pumps - Inservice Test
Control Element Drive Mechanism Control System
(CEDMCS) Operation
71111.22Surveillance Testing
Work Orders
4802907
4936283
4937964
4940893
Procedures
Number
Title
Revision
ESFAS Train B Subgroup Relay Functional Test
Diesel Generator A Test
Class 1E Diesel Generator Load Rejection 24 Hour
Rated Load And Hot Start Test Train A
CPCS Channel C Functional Test
Essential Cooling Water Pumps - Inservice Test
71114.06Drill Evaluation
Miscellaneous Documents
Number
Title
Date
1901
Dress Rehearsal Controller Guide
TSC - Position Log
2/05/2019
Significant Events Log
2/05/2019
Form EP-0541
Palo Verde NAN Emergency Message Form
71124.05Radiation Monitoring Instrumentation
Procedures
Number
Title
Revision
Radiological Monitoring Program
Procedures
Number
Title
Revision
Radiation Monitoring Calibration Test for New Scope Area
Monitors
Radiation Monitoring Calibration Test for Main Steam Line
Monitors
Calibration of the Eberline PNR-4 Neutron Dose Rate
Instrument
Canberra Whole Body Counting System Calibration
Calibration, Response Check and Operation of the SAM-12
Small Article Monitor
Calibration of the Eberline Model HP Series Frisker Probes
Calibration of the Thermo Scientific Model RO-20
Ion Chamber Survey Meter
Scaler Counting Systems Performance Checks
Audits and Self-Assessments
Number
Title
Date
2Q 2017
Integrated Performance Assessment Report:
Radiation Protection Department
09/14/2017
2018-001
Audit Plan and Report: Chemistry
04/06/2018
218-04312
2017 Annual Radiation Protection Program Summary Report
07/11/2018
2018-007
Audit Plan and Report: Radiation Safety
2/14/2018
Condition Reports
17-01400
17-02247
17-08311
17-11014
17-13020
17-13492
17-15582
17-17353
18-02590
18-09583
Portable Instrumentation Calibration Data Sheet
Number
Title
Date
4380
PNR-4/NRD-1 Calibration Data Sheet
07/10/2018
8143
RO-20 Meter Data Sheet
09/07/2018
2708085
DRM 1/2 Calibration Data Sheet
10/01/2018
2914/12818 AMS-4 Calibration Data Sheet
10/09/2018
RAS-1 Air Sampler Calibration Data Sheet
10/19/2018
1182
RM-20 Count Rate Meter Data Sheet
01/04/2019
2927
FH 40 GL Internal Detector Calibration Data Sheet
01/15/2019
Portable Instrumentation Calibration Data Sheet
Number
Title
Date
11499
FHZ 612 Teleprobe Detector Calibration Data Sheet
01/24/2019
Stationary Radiation Instrument Calibration Records
Number
Title
Date
668
Small Article Monitor Calibration Data Sheet
09/18/2018
FastScan2
Calibration Verification Data Sheet
01/16/2019
364
BC-4 Instrument Calibration Data Sheet
01/22/2019
2983
3030P Calibration Data Sheet
01/23/2019
24
CM-11 Calibration Data Sheet
01/24/2019
213
PM-12 Calibration Cover Sheet
01/31/2019
2020
iPCM-12 Calibration Cover Sheet
2/05/2019
Calibration Source Records
Number
Title
Date
N997-0358
Kaman Report of Calibration Model KDA-HR High Range
Area Monitor Ion Chamber Detector
01/23/1980
8143
Shepherd Model 89 Verification Sheet
10/14/2018
940521
CDM-21 Calibrator Verification Report
10/24/2018
Work Order Records
Number
Title
Date
4980211
74ST9SQ343 Radiation Monitoring Calibration Test for
Waste Gas Decay Tank RMC Monitor (Unit 3) RU-12
03/08/2018
4867547
74ST9SQ333 Radiation Monitoring Calibration Test for Main
Steam Line Monitors. (Unit 3) (RU-139/140)
04/23/2018
4889856
"B" CTMT Build Refueling Purge Exhaust Monitor (Unit 1
RU-34)
07/25/2018
4898443
Personnel IARM A-Side (Unit 1 RU-155D)
08/28/2018
4948127
"A" Essential Cooling Water Radiation Monitor (Unit 3 RU-02) 09/13/2018
4911530
74ST9SQ232 Radiation Monitoring Calibration Test for
Baseline Area Monitors (Unit 2 RU-148-151)
10/23/2018
Miscellaneous Documents
Number
Title
Date
LS-6500 (U1, U2, & U3)
QC: Observed Source Response - dpm
2018
U1 MCA Detectors 1, 2, & 3 QC: 88 and 1332 keV Activity and 1332 keV FWHM
2018
Miscellaneous Documents
Number
Title
Date
U2 MCA Detectors 1, 2, & 3 QC: 88 and 1332 keV Activity and 1332 keV FWHM
2018
U3 MCA Detectors 1, 2, & 3 QC: 88 and 1332 keV Activity and 1332 keV FWHM
2018
237-03041-CAS
2nd Quarter 2018 Chemistry Hot Cross Checks
07/27/2018
237-03046-CAS
4th Quarter 2018 Chemistry Hot Cross Checks
01/22/2019
71124.06Radioactive Gaseous and Liquid Effluent Treatment
Procedures
Number
Title
Revision
Radiation Monitoring Systems Alarm Validation and Response 001
Gaseous Radioactive Release Permits and Offsite Dose
Assessment
018
Secondary System Liquid Discharge
016
Radiation Monitoring System Operations
2
Radiation Monitoring System Alarm Response
23
Radiation Monitor Alarm Setpoint Determination
033
Actions for Non-Functional Radiation Monitors: Preplanned
Alternate Sampling Program
017
RMS Sample Collection
2
RU-143 Sample Operations
001
RU-145 Sample Operations
000
RMS/Effluent Action Documentation
006
Determination of Primary-to-Secondary Leak Rate
000
Audits and Self-Assessments
Number
Title
Date
17-11047-003
Radiological Monitoring Program
09/07/2017
2018-001
Nuclear Assurance Department (NAD): Chemistry
04/06/2018
2018-04312
2017 Annual Radiation Protection Program Summary
Report
07/11/2018
2018-007
Nuclear Assurance Department (NAD): Radiation Safety
2/14/2018
Condition Reports
16-02244
17-0299
17-01573
17-01926
17-05289
17-07961
17-11047
17-11559
17-13603
17-17884
18-02621
18-04140
18-04530
18-06915
18-08466
18-09004
18-11148
18-12193
18-13299
18-14265
18-14342
18-17591
19-00212
19-01531
Effluent Monitor Calibration Records
Number
Title
Date
STWO 04715454
RU-145 Unit 2 Fuel Building B Vent Exhaust Monitor Low
2/22/2017
STWO 04736183
RU-143 Unit 3 Plant Vent Monitor Low
04/22/2017
STWO 04760261
RU-146 Unit 3 Fuel Building B Vent Exhaust Monitor High
Calibration
05/10/2017
STWO 04863095
RU-144 Unit 1 Plant Vent Monitor High
09/15/2017
STWO 04980503
RU-12 Unit 1 Waste Gas Decay Tank Monitor
03/19/2018
STWO 04904815
RU-143 Unit 2 Plant Vent Monitor Low
09/20/2018
Air Cleaning System Surveillance Test Records
Number
Title
Date
STWO 4777407 Unit 1 Containment Building Purge Air Filtration Unit
09/06/2017
STWO 4813386 Unit 2 Fuel and Aux Building Essential Air Filtration Unit
2/21/2017
STWO 4836778 Unit 1 Fuel and Aux Building Essential Air Filtration Unit
2/09/2018
STWO 4866355 Unit 3 Fuel and Aux Building Essential Air Filtration Unit
05/29/2018
Gaseous Discharge Permits
Number
Title
Date
20172058
Unit 2 Refueling Purge
05/02/2017
20182030
Unit 2 Plant Vent
03/15/2018
20182103
Unit 2 Fuel Building Vent
09/11/2018
20181142
Unit 1 Plant Vent
11/08/2018
20181145
Unit 1 Fuel Building Vent
11/20/2018
20191015
Unit 1 Fuel Building Vent
01/29/2019
20192013
Unit 2 Plant Vent
01/31/2019
20192015
Unit 2 Fuel Building Vent
2/05/2019
Counting Detector Calibrations
Number
Title
Date
GMAR4L
HpGE Geometry - Unit 3 4500 cc gas Marinelli beaker
01/14/2016
PFIL1
HpGE Geometry - Unit 1 Particulate filer on shelf 1
07/20/2016
CCART1
HpGE Geometry - Unit 1 F&J cartridge on shelf 1
07/22/2016
CP1001
HpGE Geometry - Unit 2 CP100 charcoal face down shelf 1
11/21/2017
GMAR1L
HpGE Geometry - Unit 1 Gas 1L Marinelli beaker on detector face
2/08/2017
GVIAL1
HpGE Geometry - Unit 2 9.2 cc gas vial shelf 1
2/14/2017
Miscellaneous Documents
Number
Title
Date
Palo Verde Generating Station Daily Status Report
2/5-8/2019
Miscellaneous Documents
Number
Title
Date
Offsite Dose Calculation Manual (ODCM) Palo Verde
Nuclear Generating Station Units 1, 2, and 3
03/24/2016
RCTSAI 1566
2016 Annual Radioactive Effluent Release Report
04/15/2017
2-17-014
Waste Stream Report: Unit 2 Dry Active Waste
04//18/2017
1-17-042
Waste Stream Report: Unit 1 Dry Active Waste
10/28/2017
3-18-040
Waste Stream Report: Unit 3 Dry Active Waste
04/15/2018
RCTSAI 1566
2017 Annual Radioactive Effluent Release Report
04/25/2018
71124.07Radiological Environmental Monitoring Program
Procedures
Number
Title
Revision
Radiological Environmental Air Sampling
Radiological Environmental Sampling
Environmental TLD Exchange/Reporting
Land Use Census
Audits and Self-Assessments
Number
Title
Date
Integrated Performance Assessment Report - Radiation
Protection Department Quarter #1
06/22/2017
Integrated Performance Assessment Report - Radiation
Protection Department Quarter #2
09/14/2017
Integrated Performance Assessment Report - Radiation
Protection Department Quarter #3
2/19/2017
Integrated Performance Assessment Report - Radiation
Protection Department Quarter #4
03/09/2018
218-04312
Annual Radiation Protection Program Summary Report
07/11/2018
Integrated Performance Assessment Report - Radiation
Protection 1st Half 2018
08/15/2018
SWMS
No. 15-04023-003
Groundwater Protection Initiative NEW 07-07
2/06/2018
2018-007
Nuclear Assurance Department (NAD) Audit Plan and
Report - Radiation Safety
2/14/2018
Condition Reports
17-00760
17-01085
17-01203
17-01859
17-03281
17-03798
17-04052
17-04054
17-04212
17-04747
17-06259
17-07102
17-07269
17-08535
17-10101
17-10463
17-10476
17-10693
17-15048
17-17823
Condition Reports
17-18260
18-00109
18-00633
18-01069
18-01383
18-01500
18-01583
18-03310
18-04530
18-06018
18-10111
18-10649
18-10739
18-11127
18-11210
18-12934
18-14265
18-15019
Groundwater Protection Documents
Revision
or Date
Number
Title
Ground Water Protection Program
SWMS No.
15-04023-003
Groundwater Protection Initiative NEI 07-07
2/06/2018
Meteorological Calibration Records
Number
Title
Date
Met System Redundant Cab
2/12/2017
Met System Primary Cab A
11/06/2017
Met System Calibration (Primary System)
10/10/2018
Met System Calibration (Redundant System)
10/10/2018
Miscellaneous Documents
Number
Title
Date
2016
Annual Radiological Environmental Operating Report
04/14/2017
2017
Annual Radiological Environmental Operating Report
04/10/2018
71124.08Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,
and Transportation
Procedures
Number
Title
Revision
Control and Storage of Radioactive Material and Radioactive
Wastes
Low Level Radioactive Material Storage Facility Overview
76-DP-0RP01
Radioactive Waste Management Program Overview
76-DP-0RP03
Radwaste Process Control Program
76-RP-0RW03
Waste Stream Sampling and Database Maintenance
76-RP-0RW05
Packaging and Classification of Radioactive Waste
76-RP-0RW06
Packaging of Radioactive Material
76-RP-0RW07
Shipping Radioactive Materials
76-RP-0RW08
High Integrity Container Receipt, Handling, Use, and Closure 4
76-RP-0RW09
Transfer, Storage and Processing of Radioactive Filters
Procedures
Number
Title
Revision
76-RP-0RW10
Handling and Storage of Radioactively Contaminated
Chemical Waste and Mixed Waste
76-RP-0RW82
Self-Engaging Rapid Dewatering System (SERDS)
Operation
91-DP-0EN50-02
Waste Stream Characterization Administrative Guideline
Audits and Self-Assessments
Number
Title
Date
202
NUPIC Audit: WMG, Inc.
03/18/2016
24365
NUPIC Audit: Energy Solutions
2/04/2017
2017-002
NAD Audit: Procurement and Material Control
05/05/2017
2018-007
NAD Audit: Radiation Safety
2/14/2018
2-03734 January 2018 Offsite Safety Review Committee Meeting 18-001,
Operations, Chemistry and Radiation Protection Subcommittee
Report
01/26/2018
Shipping Packages
17-RW-004
17-SH-036
17-SH-055
17-SH-068
18-RW-009
18-RW-020
18-RW-022
18-RW-026
18-RW-028
18-RW-034
18-SH-018
18-SH-062
Condition Reports
17-02737
17-04797
17-12153
17-13693
17-17333
17-18114
18-00790
18-03801
18-07057
Surveys
Survey Number
Title
Date
0-M-20190110-1
DAWPS Processing Area Monthly Survey
01/10/2019
0-M-20190110-3
LLRMSF Monthly Survey
01/10/2019
0-M-20190102-2
DAWPS Monthly Yard Survey
01/10/2019
0-M-20190123-1
DAWPS Storage Area Monthly Routine Survey
01/23/2019
Sample Analyses
Type
Sample ID
Date
Unit 1 DAW
1-17-042
2/28/2018
Unit 2 DAW
2-17-014
2/28/2018
Unit 3 DAW
3-18-040
2/28/2018
Unit 2 Oil
2-18-037
09/01/2017
Miscellaneous Documents
Number
Title
Date
NBA11C000113 Radiation Protection Technician Training
Program: Packaging Radioactive Material
08/14/2018
NBA19C000109 Radiation Protection Technician Training
Program: Shipping Radioactive Material
07/31/2015
2016 Annual Radioactive Effluent Release Report
04/15/2017
2017 Annual Radioactive Effluent Release Report
04/15/2018
Employee Training Records: Shipping Radioactive
Material
03/31/2017 and
08/11/2017
Waste Control Specialist Generator Certification
Approval Letter
11/03/2017 and
09/07/2018
71151Performance Indicator Verification
Miscellaneous Documents
Number
Title
Revision
Regulatory Performance Indicator Document
71152Problem Identification and Resolution
Condition Reports
19-00802
18-18324
18-19112
18-15793
18-18212
19-02376
19-02956
19-03063
Work Orders
4481512
5101889
Procedures
Number
Title
Revision
FBEVAS, CREFAS, and CRVIAS 18 month Functional
Test
Panel B05A Alarm Response
Operations Department Repetitive Task Program
130
Drawings
Number
Title
Revision
01-E-SAB-004
Elementary Diagram ESF Actuation System BOP-
ESFAS Intertying Circuits Train A & Train B
Miscellaneous Documents
Number
Title
Revision
4OA5Other Activities (IP 60854)
Condition Reports
19-04069
Procedures
Number
Title
Revision
GQP 9.0
PCI Training, Qualification, Examination, and
Certification of NDE Personnel
GQP 9.1
PCI Training, Qualification, Examination, and
Certification of Inspection and Testing Personnel
GQP 9.2
PCI High Temperature Liquid Penetrant Examination
and Acceptance Standards for Welds
GQP 9.7
PCI Liquid Penetrant Examination and Acceptance
Standards for Welds (40 - 125 degrees F)
GQP 9.6
PCI Visual Examination of Welds
Radiation Protection for Magnastor
PI-CNSTR-OP-PV-
NMS-01
Closure Welding of Magnastor Canisters for PV
Foreign Material Exclusion Controls
MSLT-PCI-PV
Helium Mass Spectrometer Leak Test Procedure
4108-0
Design Basis Documents
Number
Title
Revision
NAC Magnastor Final Safety Analysis Report
CoC 1031
CoC and Technical Specifications for Magnastor
System
Amendment 7
Miscellaneous Documents
Revision
or Date
Number
Title
Q-16A
Leak Test Specialist NDE LT Level III Personnel
Certificate
09/19/2018
SAP #27044
PCI NDE VT/PT Level II Personnel Certificate
01/15/2019
Spotcheck Penetrant, SKL-SP2 Spotcheck Developer
SKD-S2, SKC-S, and Sherwin Certification for D-100, D-
350, KO-17, KO-19 Liquid Penetrant Materials
Various dates
Certificate of
Compliance
- 915501-02 Various Welding Shims and Wire
Various dates
Miscellaneous Documents
Revision
or Date
Number
Title
MC-GTAW
PCI Welding Procedure Specification Machine Gas
Tungsten Arc Welding
PQR-62
PCI Procedure Qualification Record for WPS 8
PQE-63
PCI Procedure Qualification Record for Manual GTAW
PQR-600
PCI Procedure Qualification Record for Machine GTAW
PQR-899
PCI Procedure Qualification Record for Machine 8
The following items are requested for the
Public Radiation Safety Inspection
at Palo Verde
Dates of Inspection: 02/04/2019 to 02/08/2019
Integrated Report 2019001
Inspection areas are listed in the attachments below.
Please provide the requested information on or before Monday, January 21, 2019.
Please submit this information using the same lettering system as below. For example, all
contacts and phone numbers for Inspection Procedure 71124.05 should be in a file/folder titled
5-A, applicable organization charts in file/folder 5-B, etc.
The information should be provided in electronic format or a secure document management
service. If information is placed on a secured document management system, please ensure
the inspection exit date entered is at least 30 days later than the onsite inspection dates, so the
inspectors will have access to the information while writing the report.
In addition to the corrective action document lists provided for each inspection procedure listed
below, please provide updated lists of corrective action documents at the entrance meeting.
The dates for these lists should range from the end dates of the original lists to the day of the
entrance meeting.
If more than one inspection procedure is to be conducted and the information requests appear
to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which
file the information can be found.
If you have any questions or comments, please contact Natasha Greene at 817-200-1154 or via
e-mail at Natasha.Greene@nrc.gov.
PAPERWORK REDUCTION ACT STATEMENT
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget,
control number 3150-0011.
5.
Radiation Monitoring Instrumentation (71124.05)
Date of Last Inspection:
January 23, 2017
A.
List of contacts and telephone numbers for the following areas below. Please include
area code and prefix. If work cell numbers are appropriate, then please include them as
well.
1. Process monitor calibration (Include Chemistry, Systems Engineering and I&C, as
applicable)
2. Radiation protection instrument calibration (Portable and Stationary)
3. Installed instrument calibrations (Include Systems Engineering and I&C)
4. Count room and Laboratory instrument calibrations (Include RP and Chemistry, as
applicable)
5. EP contacts for Equipment Important to Emergency Response/Preparedness
(EITER)
6. Licensing/Regulatory Affairs
B.
Applicable organization charts, including position or job titles. Please include as
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),
Engineering, and Emergency Protection. (Recent pictures are appreciated.)
C.
Copies of audits, self-assessments, vendor or NUPIC audits for contractor support,
LARs, and LERs, performed since the date of the last inspection, related to:
1. Portable Radiation instruments: Area radiation monitors, portable continuous air
monitors (AMS3/4), portable survey instruments (count rate, dose rate, occupational
air sampling), electronic dosimeters, teledosimetry
2. Stationary Radiation Instruments: Portal monitors, small article monitors, personnel
contamination monitors, or whole body counters
3. Installed Radiation Instruments: Area radiation monitors (RMS), process monitors
(non-effluent), criticality monitors, accident monitors
4. Count Room instrumentation (Chemistry and RP, if separate RP Ops and Effluents):
Gamma Spec, LSC, Gross Alpha, Gross Beta, including bench-top counters
D.
Procedure indexes for radiation protection procedures and other related disciplines.
1. Calibration, use, and operation of continuous air monitors, portable survey
instruments, temporary area radiation monitors, electronic dosimeters, teledosimetry
2. Calibration use and operation of portal monitors, small article monitors, personnel
contamination monitors, and whole body counters
3. Calibration of installed area radiation monitors, process monitors, criticality monitors,
and accident monitors
4. Calibration use and operation of Count Room instrumentation (GS, LSC, GA, GB)
(include bench top counters here)
NOTE: Please ensure that RP, Chemistry, and I&C procedures are included, as
appropriate.
E.
Please provide specific procedures related to the following areas noted below.
Additional procedures may be requested by number after the inspector reviews the
procedure index.
1. Calibration of portable ion chambers
2. Calibration of Friskers
3. Calibration of telescoping high range instruments
4. Calibration of portable neutron instruments
5. Calibration of SAMs
6. Whole body counter calibration
7. Laboratory instrumentation quality control
8. Calibration of Containment/Drywell high range radiation monitor
F.
Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
committed to relative to this program. Please include the revision and/or date for the
commitment and where this may be located in your current licensing basis documents.
G.
Please provide a summary list of corrective action documents (including corporate and
sub-tiered systems) written since the date of the last inspection, related to the following
programs:
1. Area radiation monitors, continuous air monitors, portable survey instruments,
electronic dosimeters, and teledosimetry
2. Portal monitors, small article monitors, personnel contamination monitors, and whole
body counters
3. Installed radiation monitors, criticality monitors, accident range monitors
4. Count room radiation instruments
NOTE: These lists should include a description of the condition that provides
sufficient detail that the inspectors can ascertain the regulatory impact, the
significance level assigned to the condition, the status of the action (e.g., open,
working, closed, etc.) and the search criteria used. Please provide in document
formats which are sortable and searchable so that inspectors can quickly and
efficiently determine appropriate sampling and perform word searches, as
needed. (Excel spreadsheets are the preferred format.) If codes are used,
please provide a legend for each column where a code is used.
H.
State the required calibration frequency and provide the most recent calibration data for
the whole body counters, at least one portable survey instrument, one area radiation
monitor, one air sampler, one continuous air monitor, and one drywell/containment high-
range monitor.
I.
Provide a list of any scheduled calibrations, while we are onsite, for the instrumentation
noted in request above, in 5-I.
J.
Provide the alarm set point values for the portal and personnel contamination monitors in
operation.
K.
Radiation Monitoring System health report for the previous 12 months
L.
Provide the following lists of instruments to include make, model, identifier (S/N or plant
ID), and location:
1. Portable radiation instruments currently in use (for EADs just make, model, and
quantity).
2. Stationary radiation instruments currently in use.
3. Installed Radiation monitors
a. Area radiation monitors and
b. Process radiation monitors.
(Include their instrumentation designator, function and calibration procedure
number and title.) Please indicate which, if any, detectors have been
replaced within the past 2 years (since the last inspection).
c. Radiation instrumentation abandoned in place.
d. Radiation instrumentation covered by the maintenance rule.
M.
Provide a list of sources used routinely for source check of portable, stationary, and
installed radiation monitoring instruments.
N.
Provide the NIST traceability and calibration or verification of the primary sources for
instrument calibration and the procedures used to achieve this.
6.
Radioactive Gaseous and Liquid Effluent Treatment (71124.06)
Date of Last Inspection:
January 23, 2017
A.
List of contacts and telephone numbers for the following areas. Please include area
code and prefix. If work cell numbers are appropriate, then please include them as well.
1. Radiological effluent control (liquid & gaseous) and reporting
(RP, Chemistry, RW, Ops, etc.)
2. Effluent Monitor calibration (liquid and gaseous) and maintenance
(RP, Chemistry, I&C, Maintenance, Systems Engineering, EP, etc.)
3. Engineered safety feature air cleaning systems for effluent release
(Systems Engineering, I&C, Maintenance, etc.)
4. Licensing/Regulatory Affairs
B.
Applicable organization charts including position or job titles for the above individuals
and also for their supportive Management. Please include as appropriate for your site,
Site Management, RP, Chemistry, Maintenance (I&C), Engineering, and Emergency
Protection. (Recent pictures are appreciated.)
C.
Copies of audits, self-assessments, vendor or NUPIC audits of contractor support, and
LERs written since the date of the last inspection, related to:
1. Radioactive effluents and effluent radiation monitors
2. Engineered Safety Feature Air cleaning systems
D.
Procedure indexes for the following areas and related disciplines.
1. Radioactive effluents and effluent radiation monitors (to include the flow monitors)
2. Engineered Safety Feature Air cleaning systems (both TS and non-TS systems for
effluents)
E.
Please provide specific procedures related to the following areas noted below.
Additional procedures may be requested by number after the inspector reviews the
procedure indexes.
1. Sampling and analysis of radioactive effluents
2. Effluent monitor setpoint determination
3. Generating radioactive effluent release permits
4. Effluent Monitor Calibrations (Include associated flow monitors)
5. Laboratory instrumentation quality control
6. In-place testing of HEPA filters and charcoal adsorbers for TS effluent exhaust
systems and other effluent air-cleaning systems, but not breathing air systems
F.
Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
committed to relative to this program. Please include the revision and/or date for the
commitment and where this may be located in your current licensing basis documents.
G.
Please provide a summary list of corrective action documents (including corporate and
sub-tiered systems) written since the date of the last inspection, associated with:
1. Radioactive effluents
2. Effluent radiation monitors (include associated effluent flow monitors)
3. Engineered Safety Feature Air cleaning systems (effluents, not breathing air)
NOTE: These lists should include a description of the condition that provides
sufficient detail that the inspectors can ascertain the regulatory impact, the
significance level assigned to the condition, the status of the action (e.g., open,
working, closed, etc.) and the search criteria used. Please provide in document
formats which are sortable and searchable so that inspectors can quickly and
efficiently determine appropriate sampling and perform word searches, as
needed. (Excel spreadsheets are the preferred format.) If codes are used,
please provide a legend for each column where a code is used.
H.
Annual Radioactive Effluent Release Reports for the latest two calendar years
I.
Current revision of the Offsite Dose Calculation Manual (or other name, but include all
parts for effluents) and any changes made since the last inspection.
J.
The inter-laboratory comparison results for laboratory quality control performance of
effluent sample analysis for the latest two calendar years
K.
Effluent sampling schedule for the week of the inspection
L.
Provide the last three annual trends of vent/stack effluent flow rates, by chart or table.
M.
Operations department (or other responsible dept.) log records for effluent monitors
removed from service or out of service or a list of the same and compensatory actions
taken during the out of service condition.
N.
Listing or log of liquid and gaseous release permits since the date of the last inspection
O.
A list of the technical specification-required air cleaning systems with the two most
recent surveillance test dates of in-place filter testing (of HEPA filters and charcoal
adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers
associated with the surveillances (and their system number/name).
P.
System Health Report for radiation monitoring instrumentation. Also, please provide a
specific list of all effluent radiation monitors that were considered inoperable for 7 days
or more since the date of the last inspection. If applicable, please provide the relative
Special Report and condition report(s). If not covered by maintenance rule, please
provide rationale.
Q.
A list of significant changes made to the gaseous and liquid effluent process monitoring
system since the date of the last inspection. If applicable, please provide the
corresponding UFSAR section in which this change was documented.
R.
A list of any occurrence in which a non-radioactive system was contaminated by a
radioactive system since the date of the last inspection. Please include any relevant
condition report(s).
S.
Current Part 61 analyses for hard to detect radionuclides
T.
Latest Land Use Census (coordinate with 71124.07)
U.
Effluent based procedures for EALs or EOPs.
7.
Radiological Environmental Monitoring Program (71124.07)
Date of Last Inspection:
January 23, 2017
A.
List of contacts and telephone numbers for the following areas. Please include area
code and prefix. If work cell numbers are appropriate, then please include them as well.
1. Radiological environmental monitoring (RP, Chemistry, I&C, etc.)
2. Meteorological monitoring (RP, Chemistry, EP, I&C, System Engineering, etc.)
3. Maintenance and calibration of the above equipment
4. Licensing/Regulatory Affairs
B.
Applicable organization charts including position or job titles. Please include as
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),
Engineering, and Emergency Protection. (Recent pictures are appreciated.)
C.
Copies of audits, self-assessments, vendor or NUPIC audits of contractor support, and
LERs written since the date of the last inspection, related to:
1. Radiological environmental monitoring program (including contractor environmental
laboratory audits, if used to perform environmental program functions)
2. Environmental TLD processing facility
3. Meteorological monitoring program
D.
Procedure index for the following areas and other related disciplines.
1. Radiological environmental monitoring program
2. Meteorological monitoring program
3. Maintenance and calibration of related instrumentation, including the meteorological
tower
E.
Please provide specific procedures related to the following areas noted below.
Additional procedures may be requested by number after the inspector reviews the
procedure indexes.
1. Sampling, collection and preparation of environmental samples
2. Sample analysis (if performed onsite)
3. Laboratory instrumentation quality control
4. Meteorological Tower sensor calibrations
F.
Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
committed to relative to this program. Please include the revision and/or date for the
commitment and where this may be located in your current licensing basis documents.
G.
Please provide a summary list of corrective action documents (including corporate and
sub-tiered systems) written since the date of the last inspection, related to the following
programs:
1. Radiological environmental monitoring (include TLDs and air sample pumps or their
infrastructure)
2. Meteorological monitoring (include Met Tower sensors and support equipment)
These lists should include a description of the condition that provides sufficient
detail that the inspectors can ascertain the regulatory impact, the significance
level assigned to the condition, the status of the action (e.g., open, working,
closed, etc.) and the search criteria used. Please provide in document formats
which are sortable and searchable so that inspectors can quickly and
efficiently determine appropriate sampling and perform word searches, as
needed. (Excel spreadsheets are the preferred format.) If codes are used,
please provide a legend for each column where a code is used.
H.
Copies of the two most recent calibration packages for the meteorological tower
instruments
I.
Copies of the Annual Radiological Environmental Operating Reports and Land Use
Census for the latest two calendar years, and current revision of the Offsite Dose
Calculation Manual. Please include any supportive documentation for the changes
made to the ODCM since the last inspection.
J.
Copy of the environmental laboratorys inter-laboratory comparison program results for
the latest two calendar years, if not included in the Annual Radiological Environmental
Operating Report
K.
Data from the environmental laboratory documenting the analytical detection sensitivities
for the various environmental sample media (i.e., air, water, soil, vegetation, and milk)
L.
Quality Assurance audits (e.g., NUPIC) for contracted services
M.
Current NEI Groundwater Protection Initiative (GPI) Plan and status. Provide the most
recent monitoring results for each monitoring well per the GPI. Provide a separate list of
any missed samples, as applicable.
N.
Technical requirements manual or licensee controlled specifications which list the
meteorological instruments calibration requirements
O.
If applicable, per NEI 07-07, provide any reports that document any spills/leaks to
groundwater since the date of the last inspection. Please indicate what external
communications were made regarding each spill/leak.
P.
Provide any new entries into 10 CFR 50.75(g) files since the date of the last inspection.
Q.
Please identify your three highest X/Q (chi/Q) and/or D/Q sectors, as currently used in
the selection of your required REMP sampling locations. If these are different values
from your most recent meteorological assessment, please provide that assessment and
indicate the three highest X/Q and/or D/Q sectors per your latest assessment. Also
indicate your noted predominant and least prevalent wind direction/sector, as used in
your REMP analysis.
R.
Provide the height of the highest effluent release point. Please indicate if the height
accounts for plant grade elevation. Please also provide the most probable atmospheric
release height, if different from the highest effluent release point.
S.
Please provide a schedule of any planned REMP sampling activities while we, the NRC,
are scheduled to be onsite performing this inspection.
8.
Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,
and Transportation (71124.08)
Date of Last Inspection:
January 23, 2017
A.
List of contacts and telephone numbers for the following areas. Please include area
code and prefix. If work cell numbers are appropriate, then please include them as well.
1. Solid Radioactive waste processing (RP, Chemistry, Ops, Maintenance, I&C,
Engineering, etc.)
2. Transportation of radioactive material/waste (RP, Maintenance, Ops, Security,
Chemistry, etc.)
3. personnel involved in solid radwaste processing, transferring, and transportation of
radioactive waste/materials)
4. Licensing/Regulatory Affairs
B.
Applicable organization charts including position or job titles. Please include as
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),
Engineering, and Emergency Protection. (Recent pictures are appreciated.)
C.
Copies of audits, department self-assessments, and LERs written since the date of the
last inspection, related to:
1. Solid radioactive waste management
2. Radioactive material/waste transportation program
D.
Procedure index for the following areas and other related disciplines.
1. Solid radioactive waste management
2. Radioactive material/waste transportation
E.
Please provide specific procedures related to the following areas noted below.
Additional procedures may be requested by number after the inspector reviews the
procedure indexes.
1. Process control program and any changes made since the last inspection
2. Solid and liquid radioactive waste processing
3. Waste stream sampling and analysis
4. Waste characterization and classification
5. Radioactive material/waste packaging & shipping
F.
Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
committed to relative to this program. Please include the revision and/or date for the
commitment and where this may be located in your current licensing basis documents.
G.
Please provide a summary list of corrective action documents (including corporate and
sub-tiered systems) written since the date of the last inspection, related to:
1. Solid radioactive waste
2. Transportation of radioactive material/waste
NOTE: These lists should include a description of the condition that provides
sufficient detail that the inspectors can ascertain the regulatory impact, the
significance level assigned to the condition, the status of the action (e.g., open,
working, closed, etc.) and the search criteria used. Please provide in document
formats which are sortable and searchable so that inspectors can quickly and
efficiently determine appropriate sampling and perform word searches, as
needed. (Excel spreadsheets are the preferred format.) If codes are used,
please provide a legend for each column where a code is used.
H.
Copies of training lesson plans for 49 CFR 172, Subpart H, for radwaste processing,
packaging, and shipping
I.
Provide a summary list or log of radioactive material and radioactive waste shipments for
the two most recent calendar years, in addition to the current calendar year.
J.
Please provide at least two different radioactive waste stream sample analysis results
and resulting scaling factors for the latest two calendar years.
K.
A listing of all onsite radwaste storage facilities. Please include a summary or list of the
items stored in each facility with the most recent dose rates/surveys.
L.
A list of any significant (e.g., DAW, resins, Type B or greater) radioactive shipments that
will be completed during our onsite inspection period. If available, please provide the
applicable shipping manifests/waste characterizations and most recent surveys for each
shipment.
M.
A list of significant changes made to the liquid or solid radwaste processing systems
since the date of the last inspection. If applicable, please provide the corresponding
UFSAR section in which this change was documented. Provide any supportive
documentation for the changes made or have it readily available for review.
N.
List of radioactive waste processing systems or equipment abandoned in place since the
last inspection.
O.
Please provide a schedule of radioactive material or waste processing or shipment
activities during the inspection week. Please indicate the current storage location of the
stored RAM or waste prepared for shipment, as well as any supportive surveys of its
measured dose rates. If available, please indicate its current stated waste class.
SUNSI Review:
ADAMS:
Non-Publicly Available
Non-Sensitive
Keyword:
By: JDixon
Yes No
Publicly Available
Sensitive
OFFICE
DRP/SRI
DRP/RI
DRP/RI
DRP/RI
C:DRS/EB1
C:DRS/EB2
NAME
CPeabody
DReinert
DYou
RBywater
VGaddy
GPick
SIGNATURE
DRR
DDY
RLB
vgg
GAP
DATE
4/24/2019
4/29/2019
4/25/2019
4/24/2019
4/25/2019
4/25/2019
OFFICE
C:DRS/OB
C:DNMS/RIB
TL:IPAT
C:DRS/RCB
C:DRP/D
NAME
GWerner
GWarnick
RKellar
NMakris
NOKeefe
SIGNATURE
GEW
JFK for
RLK
NM
DATE
04/25/2019
4/30/2019
4/25/2019
4/25/2019
4/30/2019