{{#Wiki_filter:ril 30, 2019
{{#Wiki_filter:April 30, 2019


==SUBJECT:==
==SUBJECT:==
Line 29: Line 29:


Sincerely,
Sincerely,
/RA/
/RA/  
Neil F. OKeefe, Chief Project Branch D Division of Reactor Projects Docket Nos. 05000528, 05000529, 05000530, and 07200044 License Nos. NPF-41, NPF-51, NPF-74 Enclosure:
 
Neil F. OKeefe, Chief Project Branch D Division of Reactor Projects  
 
Docket Nos. 05000528, 05000529, 05000530, and 07200044  
 
License Nos. NPF-41, NPF-51, NPF-74  
 
Enclosure:
Inspection Report 05000528/2019001, 05000529/2019001, 05000530/2019001, and 07200044/2019001 w/attachments:
Inspection Report 05000528/2019001, 05000529/2019001, 05000530/2019001, and 07200044/2019001 w/attachments:
1. Supplemental Information 2. Information Request
1. Supplemental Information 2. Information Request  


U.S. NUCLEAR REGULATORY COMMISSION
Enclosure U.S. NUCLEAR REGULATORY COMMISSION  


==Inspection Report==
==Inspection Report==
Docket Number(s): 05000528, 05000529, 05000530, and 07200044 License Number(s): NPF-41, NPF-51 and NPF-74 Report Number(s): 05000528/2019001, 05000529/2019001, 05000530/2019001, and 07200044/2019001 Enterprise Identifier: I-2019-001-0013 I-2019-001-0077 Licensee: Arizona Public Service Co.
Docket Number(s):
05000528, 05000529, 05000530, and 07200044  
 
License Number(s):
NPF-41, NPF-51 and NPF-74  
 
Report Number(s):
05000528/2019001, 05000529/2019001, 05000530/2019001, and
07200044/2019001  


Facility: Palo Verde Nuclear Generating Station and Independent Spent Fuel Storage Installation Location: 5801 South Wintersburg Road, Tonopah, AZ 85354 Inspection Dates: January 1, 2019, to March 31, 2019 Inspectors: C. Peabody, Senior Resident Inspector D. Reinert, Resident Inspector D. You, Resident Inspector R. Bywater, Resident Inspector R. Alexander, Senior Project Engineer L. Carson, Senior Health Physicist P. Elkmann, Senior Emergency Preparedness Inspector N. Greene, PhD, Senior Health Physicist S. Hedger, Emergency Preparedness Inspector J. O'Donnell, Health Physicist C. Alldredge, Allegations/Enforcement Specialist B. Baca, Health Physicist O. Masnyk Bailey, Health Physicist (Region I)
Enterprise Identifier: I-2019-001-0013
K. Warner, Health Physicist, (Region I)
 
Approved By: Neil OKeefe, Chief, Project Branch D, Division of Reactor Projects Enclosure
I-2019-001-0077
 
Licensee:
Arizona Public Service Co.
 
Facility:
Palo Verde Nuclear Generating Station and Independent Spent Fuel
Storage Installation  
 
Location:
5801 South Wintersburg Road, Tonopah, AZ 85354  
 
Inspection Dates:
January 1, 2019, to March 31, 2019  
 
Inspectors:
C. Peabody, Senior Resident Inspector  
 
D. Reinert, Resident Inspector  
 
D. You, Resident Inspector
R. Bywater, Resident Inspector  
 
R. Alexander, Senior Project Engineer  
 
L. Carson, Senior Health Physicist  
 
P. Elkmann, Senior Emergency Preparedness Inspector  
 
N. Greene, PhD, Senior Health Physicist  
 
S. Hedger, Emergency Preparedness Inspector  
 
J. O'Donnell, Health Physicist  
 
C. Alldredge, Allegations/Enforcement Specialist  
 
B. Baca, Health Physicist  
 
O. Masnyk Bailey, Health Physicist (Region I)  
 
K. Warner, Health Physicist, (Region I)  
 
Approved By:
Neil OKeefe, Chief,  
 
Project Branch D,  
 
Division of Reactor Projects  


=SUMMARY=
=SUMMARY=
Line 48: Line 111:
NRC-identified and self-revealed findings, violations, and additional items are summarized in the table below. Licensee-identified non-cited violations are documented in the Inspection Results at the end of this report.
NRC-identified and self-revealed findings, violations, and additional items are summarized in the table below. Licensee-identified non-cited violations are documented in the Inspection Results at the end of this report.


List of Findings and Violations No findings were identified.
===List of Findings and Violations===
No findings were identified.


Additional Tracking Items None.
===Additional Tracking Items===
None.


=PLANT STATUS=
=PLANT STATUS=
Line 60: Line 125:


==REACTOR SAFETY==
==REACTOR SAFETY==
 
==71111.01 - Adverse Weather Protection==
==71111.01 - Adverse Weather Protection Seasonal Extreme Weather Sample (IP Section 03.02)==
===Seasonal Extreme Weather Sample (IP Section 03.02) (1 Sample)===
{{IP sample|IP=IP 71111.01|count=1}}
 
The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of extreme high temperatures.
The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of extreme high temperatures.


==71111.04 - Equipment Alignment Partial Walkdown (IP Section 02.01)==
==71111.04 - Equipment Alignment==
{{IP sample|IP=IP 71111.04|count=3}}
===Partial Walkdown (IP Section 02.01) (3 Samples)===
 
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
: (1) Unit 3 containment spray system B, on January 24, 2019
: (1) Unit 3 containment spray system B, on January 24, 2019
Line 74: Line 136:
: (3) Unit 3 loss of power sequencer A, on March 22, 2019
: (3) Unit 3 loss of power sequencer A, on March 22, 2019


==71111.05Q - Fire Protection Quarterly Inspection (IP Section 03.01)==
==71111.05Q - Fire Protection==
{{IP sample|IP=IP 71111.05Q|count=6}}
===Quarterly Inspection (IP Section 03.01) (6 Samples)===
 
The inspectors evaluated fire protection program implementation in the following selected areas:
The inspectors evaluated fire protection program implementation in the following selected areas:
: (1) Unit 3 non-class switchgear and battery rooms, Fire Area TB4, on January 16, 2019
: (1) Unit 3 non-class switchgear and battery rooms, Fire Area TB4, on January 16, 2019
Line 85: Line 146:
: (6) Unit 1 Class 1E switchgear B room, Fire Area 5B, on March 29, 2019
: (6) Unit 1 Class 1E switchgear B room, Fire Area 5B, on March 29, 2019


==71111.06 - Flood Protection Measures Inspection Activities - Internal Flooding (IP Section 02.02a.)==
==71111.06 - Flood Protection Measures==
{{IP sample|IP=IP 71111.06|count=1}}
===Inspection Activities - Internal Flooding (IP Section 02.02a.) (1 Sample)===
 
The inspectors evaluated internal flooding mitigation protections in the 80 and 100 elevations of the Unit 1, 2, and 3 main steam support structures on March 21, 2019.
The inspectors evaluated internal flooding mitigation protections in the 80 and 100 elevations of the Unit 1, 2, and 3 main steam support structures on March 21, 2019.


Inspection Activities - Underground Cables (IP Section 02.02c.) (1 Sample)
===Inspection Activities - Underground Cables (IP Section 02.02c.) (1 Sample)===
The inspectors evaluated cable submergence protection in Unit 3 Bravo diesel fuel oil vault on March 1, 2019.
The inspectors evaluated cable submergence protection in Unit 3 Bravo diesel fuel oil vault on March 1, 2019.


==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)==
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
{{IP sample|IP=IP 71111.11Q|count=1}}
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)


The inspectors observed and evaluated Unit 3 control room operators during a maintenance activity to replace power switch assemblies for control element assembly 22 on February 12, 2019.
The inspectors observed and evaluated Unit 3 control room operators during a maintenance activity to replace power switch assemblies for control element assembly 22 on February 12, 2019.


Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
The inspectors observed and evaluated a licensed operator continuing training simulator scenario on February 5, 2019. The inspectors assessed the performance of the operators and the control room simulator.
The inspectors observed and evaluated a licensed operator continuing training simulator scenario on February 5, 2019. The inspectors assessed the performance of the operators and the control room simulator.


==71111.12 - Maintenance Effectiveness Routine Maintenance Effectiveness Inspection (IP Section 02.01)==
==71111.12 - Maintenance Effectiveness==
{{IP sample|IP=IP 71111.12|count=2}}
===Routine Maintenance Effectiveness Inspection (IP Section 02.01) (2 Samples)===
 
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
: (1) Unit 1 chemical and volume control system charging pump discharge pressure relief valve failures, on January 24, 2019
: (1) Unit 1 chemical and volume control system charging pump discharge pressure relief valve failures, on January 24, 2019
: (2) Unit 3 essential chilled water temperature control valve ECB-TV0030, on March 21, 2019
: (2) Unit 3 essential chilled water temperature control valve ECB-TV0030, on March 21, 2019


==71111.13 - Maintenance Risk Assessments and Emergent Work Control Risk Assessment and Management Sample (IP Section 03.01)==
==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
{{IP sample|IP=IP 71111.13|count=3}}
===Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)===
 
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
: (1) Unit 2 elevated risk during station blackout generator and high pressure safety injection pump A maintenance, on January 8, 2019
: (1) Unit 2 elevated risk during station blackout generator and high pressure safety injection pump A maintenance, on January 8, 2019
Line 116: Line 174:
: (3) Unit 3 online risk during diesel generator A super outage, on March 5, 2019
: (3) Unit 3 online risk during diesel generator A super outage, on March 5, 2019


==71111.15 - Operability Determinations and Functionality Assessments Sample Selection (IP Section 02.01)==
==71111.15 - Operability Determinations and Functionality Assessments==
{{IP sample|IP=IP 71111.15|count=6}}
===Sample Selection (IP Section 02.01) (6 Samples)===
 
The inspectors evaluated the following operability determinations and functionality assessments:
The inspectors evaluated the following operability determinations and functionality assessments:
: (1) Unit 3 spent fuel pool decrease in Boron-10 concentration, on January 25, 2019
: (1) Unit 3 spent fuel pool decrease in Boron-10 concentration, on January 25, 2019
Line 127: Line 184:
: (6) Unit 3 pressurizer level control system tuning issues, on March 26, 2019
: (6) Unit 3 pressurizer level control system tuning issues, on March 26, 2019


==71111.18 - Plant Modifications Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)==
==71111.18 - Plant Modifications==
{{IP sample|IP=IP 71111.18|count=2}}
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples)


The inspectors evaluated the following temporary or permanent modifications:
The inspectors evaluated the following temporary or permanent modifications:
Line 134: Line 191:
: (2) Station blackout generator 1 and 2 modification for permanently adjusting lube oil high pressure alarm set point, on March 20, 2019
: (2) Station blackout generator 1 and 2 modification for permanently adjusting lube oil high pressure alarm set point, on March 20, 2019


==71111.19 - Post Maintenance Testing Post Maintenance Test Sample (IP Section 03.01)==
==71111.19 - Post Maintenance Testing==
{{IP sample|IP=IP 71111.19|count=4}}
===Post Maintenance Test Sample (IP Section 03.01) (4 Samples)===
 
The inspectors evaluated the following post maintenance tests:
The inspectors evaluated the following post maintenance tests:
: (1) Unit 3 control element assembly power switch assembly test following replacement, on February 12, 2019
: (1) Unit 3 control element assembly power switch assembly test following replacement, on February 12, 2019
Line 143: Line 199:
: (4) Unit 3 safety injection valve 615 test following periodic maintenance, on March 19, 2019
: (4) Unit 3 safety injection valve 615 test following periodic maintenance, on March 19, 2019


==71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests:
==71111.22 - Surveillance Testing==
In Service Testing (IST) (IP Section 03.01)==
The inspectors evaluated the following surveillance tests:  
 
===In Service Testing (IST) (IP Section 03.01)===
{{IP sample|IP=IP 71111.22|count=1}}
{{IP sample|IP=IP 71111.22|count=1}}


77ST-9EW01, Unit 1 essential cooling water A inservice pump test, on January 31, 2019
77ST-9EW01, Unit 1 essential cooling water A inservice pump test, on January 31, 2019  


===Surveillance Testing (IP Section 03.01) (3 Samples)===
===Surveillance Testing (IP Section 03.01) (3 Samples)===
: (1) Unit 3 diesel generator A 24 hour surveillance and hot restart, on January 7, 2019
: (1) Unit 3 diesel generator A 24 hour surveillance and hot restart, on January 7, 2019  
: (2) 77ST-9SB19, Unit 1 core protection calculator system channel C functional test, on January 8, 2019
: (3) 36ST-9SA02, Unit 1 engineered safety features actuation system train B subgroup relay functional testing, on February 21, 2019


==71114.06 - Drill Evaluation Drill and/or Simulator-Based Licensed Operator Requalification Training (IP Section 02.01)
(2)77ST-9SB19, Unit 1 core protection calculator system channel C functional test, on January 8, 2019
  (see 71114.06 for sample guidance)==
 
(3)36ST-9SA02, Unit 1 engineered safety features actuation system train B subgroup relay functional testing, on February 21, 2019
 
==71114.06 - Drill Evaluation==
Drill and/or Simulator-Based Licensed Operator Requalification Training (IP Section 02.01)  
 
===(see 71114.06 for sample guidance)===
{{IP sample|IP=IP 71114.06|count=1}}
{{IP sample|IP=IP 71114.06|count=1}}


The inspectors evaluated a dress rehearsal drill that required emergency facilities to respond to a fire in a diesel generator room, a steam generator tube rupture, and a steam line break on February 5, 2019.
The inspectors evaluated a dress rehearsal drill that required emergency facilities to respond to a fire in a diesel generator room, a steam generator tube rupture, and a steam line break on February 5, 2019.


==71114.08 - Exercise Evaluation Scenario Review Inspection Review (IP Section 02.01 - 02.04)==
==71114.08 - Exercise Evaluation Scenario Review==
{{IP sample|IP=IP 71114.08|count=1}}
===Inspection Review (IP Section 02.01 - 02.04) (1 Sample)===
 
The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on February 11, 2019. This review did not constitute approval of the scenario.
The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on February 11, 2019. This review did not constitute approval of the scenario.


==RADIATION SAFETY==
==RADIATION SAFETY==
 
==71124.05 - Radiation Monitoring Instrumentation==
==71124.05 - Radiation Monitoring Instrumentation Calibration and Testing Program (IP Section 02.02)==
===Calibration and Testing Program (IP Section 02.02) (1 Sample)===
{{IP sample|IP=IP 71124.05|count=1}}
 
The inspectors evaluated the calibration and testing program implementation.
The inspectors evaluated the calibration and testing program implementation.


Line 177: Line 236:
* SAC-4
* SAC-4
* PNR-4
* PNR-4
* MGTM
* MGTM  


===Walk Downs and Observations (IP Section 02.01) (1 Sample)===
===Walk Downs and Observations (IP Section 02.01) (1 Sample)===
The inspectors evaluated radiation monitoring instrumentation during plant walkdowns. The inspector observed the following:
The inspectors evaluated radiation monitoring instrumentation during plant walkdowns. The inspector observed the following:  
 
Portable survey instruments:
Portable survey instruments:
* BC-4
* BC-4
Line 186: Line 246:
* RM-20 (multiple)
* RM-20 (multiple)
* FH40GL
* FH40GL
* CM-11 Source check demonstration:
* CM-11  
 
Source check demonstration:
* RM-20
* RM-20
* FH40GL
* FH40GL
* SAM-12 Area radiation monitors and continuous air monitors:
* SAM-12  
 
Area radiation monitors and continuous air monitors:
* RU-1
* RU-1
* RU-2
* RU-2
Line 205: Line 269:
* RU-152A
* RU-152A
* RU-155D
* RU-155D
* RU-158D Personnel contamination monitors, portal monitors and small article monitors:
* RU-158D  
 
Personnel contamination monitors, portal monitors and small article monitors:
* iPCM-12
* iPCM-12
* PCM-12
* PCM-12
* SAM-12
* SAM-12


==71124.06 - Radioactive Gaseous and Liquid Effluent Treatment Calibration and Testing Program (Process & Effluent Monitors) (IP Section 02.02)==
==71124.06 - Radioactive Gaseous and Liquid Effluent Treatment==
{{IP sample|IP=IP 71124.06|count=1}}
Calibration and Testing Program (Process & Effluent Monitors) (IP Section 02.02) (1 Sample)


The inspectors reviewed the following gaseous and liquid effluent monitor instrument calibrations and tests:
The inspectors reviewed the following gaseous and liquid effluent monitor instrument calibrations and tests:
Line 219: Line 285:
* RU-145, Unit 2 Fuel Building B Vent Exhaust Monitor Low Calibration
* RU-145, Unit 2 Fuel Building B Vent Exhaust Monitor Low Calibration
* RU-143, Unit 3 Plant Vent Monitor Low Calibration
* RU-143, Unit 3 Plant Vent Monitor Low Calibration
* RU-146, Unit 3 Fuel Building B Vent Exhaust Monitor High Calibration Dose Calculations (IP Section 02.05) (1 Sample):
* RU-146, Unit 3 Fuel Building B Vent Exhaust Monitor High Calibration  
 
Dose Calculations (IP Section 02.05) (1 Sample):  
 
The inspectors reviewed the following liquid and gaseous discharge permits to evaluate public dose calculations:
The inspectors reviewed the following liquid and gaseous discharge permits to evaluate public dose calculations:
* Permit 20172058, Unit 2 Refueling Purge
* Permit 20172058, Unit 2 Refueling Purge
Line 228: Line 297:
* Permit 20191015, Unit 1 Fuel Building Vent
* Permit 20191015, Unit 1 Fuel Building Vent
* Permit 20192013, Unit 2 Plant Vent
* Permit 20192013, Unit 2 Plant Vent
* Permit 20192015, Unit 2 Fuel Building Vent The inspectors also reviewed the following annual radiological effluent release reports:
* Permit 20192015, Unit 2 Fuel Building Vent  
 
The inspectors also reviewed the following annual radiological effluent release reports:
* 2016 Annual Radioactive Effluent Release Report
* 2016 Annual Radioactive Effluent Release Report
* 2017 Annual Radioactive Effluent Release Report Abnormal gaseous or liquid tank discharges:
* 2017 Annual Radioactive Effluent Release Report  
* CR-2018-14265, Oily Waste Separator Tank Overflow
 
Abnormal gaseous or liquid tank discharges:
* CR-2018-14265, Oily Waste Separator Tank Overflow  


===Instrumentation and Equipment (IP Section 02.04) (1 Sample)===
===Instrumentation and Equipment (IP Section 02.04) (1 Sample)===
Line 238: Line 311:
* STWO 4813386, Unit 2 Fuel and Aux Building Essential Air Filtration Unit
* STWO 4813386, Unit 2 Fuel and Aux Building Essential Air Filtration Unit
* STWO 4836778, Unit 1 Fuel and Aux Building Essential Air Filtration Unit
* STWO 4836778, Unit 1 Fuel and Aux Building Essential Air Filtration Unit
* STWO 4866355, Unit 3 Fuel and Aux Building Essential Air Filtration Unit
* STWO 4866355, Unit 3 Fuel and Aux Building Essential Air Filtration Unit  


===Sampling and Analysis (IP Section 02.03) (1 Sample)===
===Sampling and Analysis (IP Section 02.03) (1 Sample)===
Line 244: Line 317:
* RU-145, Unit 3 Fuel Building Radiation Monitor Filter Change out and Gas Grab Sample
* RU-145, Unit 3 Fuel Building Radiation Monitor Filter Change out and Gas Grab Sample
* RU-143, Unit 2 Plant Ventilation Radiation Monitor Filter Change out and Gas Grab Sample
* RU-143, Unit 2 Plant Ventilation Radiation Monitor Filter Change out and Gas Grab Sample
* Unit 2 Primary to Secondary Sampling Effluent discharges:
* Unit 2 Primary to Secondary Sampling  
 
Effluent discharges:
* Unit 3 Fuel Building Vent Gas Effluent Discharge Permit
* Unit 3 Fuel Building Vent Gas Effluent Discharge Permit
* Unit 2 Plant Vent Gas Effluent Discharge Permit
* Unit 2 Plant Vent Gas Effluent Discharge Permit  


===Walk Downs and Observations (IP Section 02.01) (1 Sample)===
===Walk Downs and Observations (IP Section 02.01) (1 Sample)===
Line 255: Line 330:
* Unit 3 Fuel Building Ventilation Exhaust System
* Unit 3 Fuel Building Ventilation Exhaust System


==71124.07 - Radiological Environmental Monitoring Program Groundwater Protection Initiative (GPI) Implementation (IP Section 02.02)==
==71124.07 - Radiological Environmental Monitoring Program==
{{IP sample|IP=IP 71124.07|count=1}}
===Groundwater Protection Initiative (GPI) Implementation (IP Section 02.02) (1 Sample)===
 
The inspectors evaluated the licensee's groundwater monitoring program.
The inspectors evaluated the licensee's groundwater monitoring program.


Line 264: Line 338:


Walkdowns and calibration and maintenance record review:
Walkdowns and calibration and maintenance record review:
* Air Sampling Station Site 4 The inspectors observed the following environmental sample collections and preparation:
* Air Sampling Station Site 4  
 
The inspectors observed the following environmental sample collections and preparation:
* Sites 4, 6A, 7A, 14A, 15, 17A, 21, 29, 35, and 40
* Sites 4, 6A, 7A, 14A, 15, 17A, 21, 29, 35, and 40
* Goat milk Licensee actions in response to missed sample, inoperable sampler, lost thermoluminescent detector (TLD) or anomalous measurement:
* Goat milk Licensee actions in response to missed sample, inoperable sampler, lost thermoluminescent detector (TLD) or anomalous measurement:
* Air Sample Site 6A
* Air Sample Site 6A
* Milk Sample Site 53
* Milk Sample Site 53
* TLD Site 16 Sampling program for the potential of licensed material entering groundwater
* TLD Site 16  
 
Sampling program for the potential of licensed material entering groundwater
* Reactor Water Makeup Tank
* Reactor Water Makeup Tank
* Reactor Water Tank
* Reactor Water Tank
Line 275: Line 353:
* Essential Pipe Density Tunnel
* Essential Pipe Density Tunnel


==71124.08 - Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Radioactive Material Storage (IP Section 02.01)==
==71124.08 - Radioactive Solid Waste Processing and Radioactive Material Handling, Storage,==
and Transportation  
 
===Radioactive Material Storage (IP Section 02.01)===
{{IP sample|IP=IP 71124.08|count=1}}
{{IP sample|IP=IP 71124.08|count=1}}


The inspectors evaluated radioactive material storage in the follow areas:
The inspectors evaluated radioactive material storage in the follow areas:
* Dry Active Waste Processing and Storage (DAWPS) Facility
* Dry Active Waste Processing and Storage (DAWPS) Facility
* Low Level Radioactive Materials Storage Facility (LLRWSF)
* Low Level Radioactive Materials Storage Facility (LLRWSF)  
 
Container check (e.g., swelling, leakage and deformation):
Container check (e.g., swelling, leakage and deformation):
* 10-4191 Main Steam Safety Valve container
* 10-4191 Main Steam Safety Valve container
Line 292: Line 374:
* 19-2-007 Intermodal Asphalt
* 19-2-007 Intermodal Asphalt
* 19-2-008 Intermodal Asphalt
* 19-2-008 Intermodal Asphalt
* 19-3-006 Sealand DAW Radioactive Waste System Walkdown (IP Section 02.02) (1 Sample)
* 19-3-006 Sealand DAW  
 
===Radioactive Waste System Walkdown (IP Section 02.02) (1 Sample)===
The inspectors evaluated the following radioactive waste processing systems and processes during plant walkdowns.
The inspectors evaluated the following radioactive waste processing systems and processes during plant walkdowns.


Line 300: Line 384:
Radioactive waste resin and/or sludge discharges processes:
Radioactive waste resin and/or sludge discharges processes:
* High Integrity Container Receipt, Handling, Use, and Closure
* High Integrity Container Receipt, Handling, Use, and Closure
* Self-Engaging Rapid Dewatering Systems (SERDS) Operation
* Self-Engaging Rapid Dewatering Systems (SERDS) Operation  


===Shipment Preparation (IP Section 02.04) (1 Sample)===
===Shipment Preparation (IP Section 02.04) (1 Sample)===
Line 313: Line 397:
* 18-RW-034
* 18-RW-034
* 18-SH-018
* 18-SH-018
* 18-SH-062 Waste Characterization and Classification (IP Section 02.03) (1 Sample)
* 18-SH-062  
 
===Waste Characterization and Classification (IP Section 02.03) (1 Sample)===
The inspectors evaluated the radioactive waste characterization and classification for the following waste streams:
The inspectors evaluated the radioactive waste characterization and classification for the following waste streams:
* Dry Active Waste streams for Unit 1 (Sample ID: 1-17-042),
* Dry Active Waste streams for Unit 1 (Sample ID: 1-17-042),
Line 322: Line 408:


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:


===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01) ===
{{IP sample|IP=IP 71151|count=3}}
{{IP sample|IP=IP 71151|count=3}}
Units 1, 2, and 3, January 1, 2018-December 31, 2018 IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02)
 
  (3 Samples)
Units 1, 2, and 3, January 1, 2018-December 31, 2018  
Units 1, 2, and 3, January 1, 2018-December 31, 2018 IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03)
 
  (3 Samples)
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (3 Samples)  
Units 1, 2, and 3, January 1, 2018-December 31, 2018 MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) (3 Samples)
 
Units 1, 2, and 3, January 1, 2018-December 31, 2018
Units 1, 2, and 3, January 1, 2018-December 31, 2018 IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (3 Samples)  
 
Units 1, 2, and 3, January 1, 2018-December 31, 2018  
 
===MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) (3 Samples)===
Units 1, 2, and 3, January 1, 2018-December 31, 2018  


===Drill/Exercise Performance (IP Section 02.12) (1 Sample)===
===Drill/Exercise Performance (IP Section 02.12) (1 Sample)===
Line 339: Line 432:
The inspector reviewed data for the ERO Participation Performance indicator for the period January 1, 2018, through December 31, 2018.
The inspector reviewed data for the ERO Participation Performance indicator for the period January 1, 2018, through December 31, 2018.


Alert & Notification System Reliability (IP Section 02.14) (1 Sample)
===Alert & Notification System Reliability (IP Section 02.14) (1 Sample)===
The inspector reviewed data for the Alert and Notification Performance indicator for the period January 1, 2018, through December 31, 2018.
The inspector reviewed data for the Alert and Notification Performance indicator for the period January 1, 2018, through December 31, 2018.


==71152 - Problem Identification and Resolution Annual Follow-up of Selected Issues (IP Section 02.03)==
==71152 - Problem Identification and Resolution==
{{IP sample|IP=IP 71152|count=2}}
===Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)===
 
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
: (1) Units 1 and 3 control element drive mechanism control system power switch assembly failures
: (1) Units 1 and 3 control element drive mechanism control system power switch assembly failures
Line 350: Line 442:


==OTHER ACTIVITIES==
==OTHER ACTIVITIES==
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 60854 - Preoperational Testing of an Independent Spent Fuel Storage Inspection (ISFSI)
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL  
 
60854 - Preoperational Testing of an Independent Spent Fuel Storage Inspection (ISFSI)  
 
An ISFSI inspection was conducted at PVNGS on March 19-21, 2019, by inspectors from Region I, Division of Nuclear Materials Safety. The PVNGS ISFSI was licensed as a general 10 CFR Part 72 licensee. The licensee had been utilizing the NAC, Universal Multi-Purpose Canister system (UMS), approved under Certificate of Compliance (CoC) 72-1015, Amendment 5, and NAC UMS Final Safety Analysis Report (FSAR), Revision 11, to load and store spent fuel at their ISFSI. At the time of the on-site inspection, PVNGSs ISFSI pad contained 152 NAC ventilated concrete casks (VCCs), each containing the steel Transportable Storage Container (TSC) with a capacity for 24 pressurized water reactor (PWR) spent fuel assemblies. The last routine ISFSI inspection was performed in March 2017 (ADAMS Accession No. ML17130B002).
An ISFSI inspection was conducted at PVNGS on March 19-21, 2019, by inspectors from Region I, Division of Nuclear Materials Safety. The PVNGS ISFSI was licensed as a general 10 CFR Part 72 licensee. The licensee had been utilizing the NAC, Universal Multi-Purpose Canister system (UMS), approved under Certificate of Compliance (CoC) 72-1015, Amendment 5, and NAC UMS Final Safety Analysis Report (FSAR), Revision 11, to load and store spent fuel at their ISFSI. At the time of the on-site inspection, PVNGSs ISFSI pad contained 152 NAC ventilated concrete casks (VCCs), each containing the steel Transportable Storage Container (TSC) with a capacity for 24 pressurized water reactor (PWR) spent fuel assemblies. The last routine ISFSI inspection was performed in March 2017 (ADAMS Accession No. ML17130B002).


Line 381: Line 476:
71111.01Adverse Weather Protection
71111.01Adverse Weather Protection
Procedures
Procedures
Number           Title                                             Revision
Number
40OP-9ZZ19       Hot Weather Protection                           7
Title
40OP-9HS01       Site Building HVAC                               16
Revision
40OP-9ZZ19
Hot Weather Protection
40OP-9HS01
Site Building HVAC  
 
Calculations
Calculations
Number           Title                                             Revision
Number
13-MC-SP-0307     SP/EW System Thermal Performance Design Bases     9
Title
Analysis
Revision
13-MC-SP-0307
SP/EW System Thermal Performance Design Bases
Analysis  
 
71111.04Equipment Alignment
71111.04Equipment Alignment
Condition Reports
Condition Reports
17-02911
17-02911  
 
Work Orders
Work Orders
2711244     2781196
2711244
2781196  
 
Procedures
Procedures
Number           Title                                             Revision
Number
40OP-9DG01       Emergency Diesel Generator A                     79
Title
40ST-9SI13       Train A LPSI and CS System Alignment Verification 36
Revision
40OP-9DG01
Emergency Diesel Generator A
40ST-9SI13
Train A LPSI and CS System Alignment Verification  
 
Drawings
Drawings
Number           Title                                             Revision
Number
13-M-DGP-0001     P & I Diagram Diesel Generator System             61
Title
Revision
13-M-DGP-0001
P & I Diagram Diesel Generator System  
 
71111.05AQFire Protection Annual/Quarterly
71111.05AQFire Protection Annual/Quarterly
Miscellaneous Documents                                             Revision
Miscellaneous Documents
Number           Title                                             or Date
Revision
PVNGS Updated FSAR                               19
or Date
PVGS Pre-Fire Strategies Manual                   26
Number
13-MC-ZA-0808     MSSS Flooding At Elevation 81                   6
Title
Fire Protection Database Detailed Report         05/09/1998
PVNGS Updated FSAR  
PVNGS Safety Evaluation Report
 
PVGS Pre-Fire Strategies Manual
13-MC-ZA-0808
MSSS Flooding At Elevation 81  
 
Fire Protection Database Detailed Report
05/09/1998
PVNGS Safety Evaluation Report  
 
71111.06Flood Protection Measures
71111.06Flood Protection Measures
Condition Reports
Condition Reports
19-02890         19-02658           19-02418         19-02625
19-02890
19-02658
19-02418
19-02625  
 
Procedures
Procedures
Number           Title                                                 Revision
Number
40DP-9OPA3       Auxiliary Building Station Rounds                     84
Title
40AL-9RK2B       Panel B02B Alarm Response                             59
Revision
40OP-9RD01       Radwaste Facility Sumps and Drains                   19
40DP-9OPA3
Auxiliary Building Station Rounds
40AL-9RK2B
Panel B02B Alarm Response
40OP-9RD01
Radwaste Facility Sumps and Drains  
 
Drawings
Drawings
Number           Title                                                 Revision
Number
01-M-RDP-002     Radioactive Waste Drain System                       14
Title
2-M-RDP-002     Radioactive Waste Drain System                       18
Revision
03-M-RDP-002     Radioactive Waste Drain System                       13
01-M-RDP-002
Miscellaneous Documents                                                 Revision
Radioactive Waste Drain System
Number           Title                                                 or Date
2-M-RDP-002
PVNGS Updated FSAR                                   19
Radioactive Waste Drain System
Pre-Fire Strategies Manual                           26
03-M-RDP-002
13-MC-ZA-0808     MSSS Flooding at Elevation 81                       6
Radioactive Waste Drain System  
PO EDC-2019-     Revise Calculation 13-MC-ZA-0808                      03/01/2019
 
Miscellaneous Documents
Revision
or Date
Number
Title
PVNGS Updated FSAR  
 
Pre-Fire Strategies Manual
13-MC-ZA-0808
MSSS Flooding at Elevation 81
PO EDC-2019-
00144
00144
Revise Calculation 13-MC-ZA-0808
03/01/2019
71111.11Licensed Operator Requalification Program and Licensed Operator Performance
71111.11Licensed Operator Requalification Program and Licensed Operator Performance
Procedures
Procedures
Number           Title                                                 Revision
Number
40DP-9OP02       Conduct of Operations                                 72
Title
01DP-0AP57       Management of Critical Evolutions and Infrequently   2
Revision
Performed Test or Evolutions
40DP-9OP02
Conduct of Operations
01DP-0AP57
Management of Critical Evolutions and Infrequently
Performed Test or Evolutions  
 
Miscellaneous Documents
Miscellaneous Documents
Number           Title                                                 Date
Date
Licensed Operator Continuing Training Simulator       02/05/2019
Number
Title
Licensed Operator Continuing Training Simulator
Evaluation Scenario
Evaluation Scenario
2/05/2019
71111.12Maintenance Effectiveness
71111.12Maintenance Effectiveness
Condition Reports
Condition Reports
18-16615         18-02240           18-01811         19-02330         19-02133
18-16615
18-10880         18-10879           19-02364
18-02240
18-01811
19-02330
19-02133
18-10880
18-10879
19-02364  
 
Work Orders
Work Orders
4441828     4441462
4441828
4441462  
 
Miscellaneous Documents
Miscellaneous Documents
Number           Title                                                 Date
Number
19-02330-006     Engineering Evaluation                               02/21/2019
Title
Palo Verde Maintenance Rule Database
Date
19-02330-006
Engineering Evaluation
2/21/2019
Palo Verde Maintenance Rule Database  
 
71111.13Maintenance Risk Assessments and Emergent Work Control
71111.13Maintenance Risk Assessments and Emergent Work Control
Condition Reports
Condition Reports
16-15545
16-15545  
 
Procedures
Procedures
Number           Title                                                   Revision
Number
40DP-9RS01       Operations Department Online Nuclear Risk               4
Title
Revision
40DP-9RS01
Operations Department Online Nuclear Risk
Management in Modes 1 and 2
Management in Modes 1 and 2
70DP-0RA05       Assessment and Management of Risk When Performing       23
70DP-0RA05
Assessment and Management of Risk When Performing
Maintenance
Maintenance
40DP-9AP21       Protected Equipment                                     7
40DP-9AP21
Protected Equipment  
 
Miscellaneous Documents
Miscellaneous Documents
Number           Title                                                 Date
Number
EOOS 4.1         Schedulers Evaluation for Palo Verde Unit 1         02/21/2019 09:41
Title
EOOS 4.1         Schedulers Evaluation for Palo Verde Unit 3         03/05/2019
Date
EOOS 4.1
Schedulers Evaluation for Palo Verde Unit 1
2/21/2019 09:41
EOOS 4.1
Schedulers Evaluation for Palo Verde Unit 3
03/05/2019
71111.15Operability Determinations and Functionality Assessments
71111.15Operability Determinations and Functionality Assessments
Condition Reports
Condition Reports
18-16665         17-04204           18-18476           19-02567         19-02330
18-16665
19-01290         18-17794           19-01962           19-01941         14-00853
17-04204
19-04380         19-04382
18-18476
19-02567
19-02330
19-01290
18-17794
19-01962
19-01941
14-00853
19-04380
19-04382  
 
Work Orders
Work Orders
5071741
5071741  
 
Procedures
Procedures
Number           Title                                                   Revision
Number
40DP-9OP26       Operations Condition Reporting Process and Operability 46
Title
Revision
40DP-9OP26
Operations Condition Reporting Process and Operability
Determination / Functionality Assessment
Determination / Functionality Assessment
73DP-0EE05       Engineering Preventive Maintenance Program             0
73DP-0EE05
Engineering Preventive Maintenance Program  
 
Procedures
Procedures
Number           Title                                                 Revision
Number
40OP-9SV01       Loose Parts and Vibration Monitoring                 14
Title
73TI-9ZZ35       Ultrasonic Examination of Reactor Coolant Pump Shafts 7
Revision
31MT-9RC23       Reactor Coolant Pump Sulzer Bingham Seal             38
40OP-9SV01
Loose Parts and Vibration Monitoring
73TI-9ZZ35
Ultrasonic Examination of Reactor Coolant Pump Shafts 7
31MT-9RC23
Reactor Coolant Pump Sulzer Bingham Seal
Replacement
Replacement
40TI-9SF01       Pressurizer Level Control System Tuning               0
40TI-9SF01
Miscellaneous Documents                                                 Revision
Pressurizer Level Control System Tuning  
Number           Title                                                 or Date
 
18-17794-004     Level 2 Cause Analysis Report                         0
Miscellaneous Documents
TR-100491         EPRI: UPS Maintenance and Application Guide
Revision
Design Basis Manual: Safety Injection System         38
or Date
CRAI 3245187     Evaluation of the Class-1E and PK Inverters and
Number
Title
18-17794-004
Level 2 Cause Analysis Report
TR-100491
EPRI: UPS Maintenance and Application Guide  
 
Design Basis Manual: Safety Injection System
CRAI 3245187
Evaluation of the Class-1E and PK Inverters and
Associated Subcomponents
Associated Subcomponents
CRDR 3300933     10 Year SCR Replacement for PN and PK Inverters
CRDR 3300933
RCTSAI 4524360   RCP Vibration Monitoring                             04/17/2014
Year SCR Replacement for PN and PK Inverters
RCTSAI 4524358   RCP Shaft Ultrasonic Inspection Following Seal       04/17/2014
RCTSAI 4524360
RCP Vibration Monitoring
04/17/2014
RCTSAI 4524358
RCP Shaft Ultrasonic Inspection Following Seal
Replacement
Replacement
RCTS 4524352     RCP Vibration Monitoring and Shaft UT Inspections     04/18/2014
04/17/2014
PVAR 4524366     Actions for License Amendments 84, 72, and 56         04/17/2014
RCTS 4524352
RCP Vibration Monitoring and Shaft UT Inspections
04/18/2014
PVAR 4524366
Actions for License Amendments 84, 72, and 56
04/17/2014
71111.18Plant Modifications
71111.18Plant Modifications
Condition Reports
Condition Reports
16-19472         19-02927           14-00965         18-04376
16-19472
19-02927
14-00965
18-04376  
 
Work Orders
Work Orders
3094267     4805058
3094267
4805058  
 
Miscellaneous Documents
Miscellaneous Documents
Number           Title                                                 Revision
Number
S-19-0005         10 CFR 50.59 Screening/Evaluation                     0
Title
18-04376-004     Design Equivalent Change Package: TMOD SBOG#!         0
Revision
S-19-0005
CFR 50.59 Screening/Evaluation
18-04376-004
Design Equivalent Change Package: TMOD SBOG#!
Lube Oil High Pressure Alarm Set point Schedule
Lube Oil High Pressure Alarm Set point Schedule
Adjustment
Adjustment  
 
71111.19Post Maintenance Testing
71111.19Post Maintenance Testing
Condition Reports
Condition Reports
16-03732         19-03482           19-04033
16-03732
19-03482
19-04033  
 
Work Orders
Work Orders
5103635     4945749       4498502     4507037     4752532       5055992     5076980
5103635
4960255     5085998
4945749
4498502
4507037
4752532
5055992
5076980
4960255
5085998  
 
Procedures
Procedures
Number             Title                                                   Revision
Number
40OP-9DG01         Emergency Diesel Generator A                           79
Title
40OP-9DF01         Diesel Fuel Oil Storage and Transfer                   43
Revision
73ST-9DF01         Diesel Fuel Oil Transfer Pumps - Inservice Test         28
40OP-9DG01
40OP-9SF01         Control Element Drive Mechanism Control System         30
Emergency Diesel Generator A
                    (CEDMCS) Operation
40OP-9DF01
Diesel Fuel Oil Storage and Transfer
73ST-9DF01
Diesel Fuel Oil Transfer Pumps - Inservice Test
40OP-9SF01
Control Element Drive Mechanism Control System  
(CEDMCS) Operation  
 
71111.22Surveillance Testing
71111.22Surveillance Testing
Work Orders
Work Orders
4802907     4936283       4937964     4940893
4802907
4936283
4937964
4940893  
 
Procedures
Procedures
Number             Title                                                   Revision
Number
36ST-9SA02         ESFAS Train B Subgroup Relay Functional Test           47
Title
40ST-9DG01         Diesel Generator A Test                                 50
Revision
73ST-9DG07         Class 1E Diesel Generator Load Rejection 24 Hour       10
36ST-9SA02
ESFAS Train B Subgroup Relay Functional Test
40ST-9DG01
Diesel Generator A Test
73ST-9DG07
Class 1E Diesel Generator Load Rejection 24 Hour
Rated Load And Hot Start Test Train A
Rated Load And Hot Start Test Train A
77ST-9SB19         CPCS Channel C Functional Test                         12
77ST-9SB19
73ST-9EW01         Essential Cooling Water Pumps - Inservice Test         33
CPCS Channel C Functional Test
73ST-9EW01
Essential Cooling Water Pumps - Inservice Test  
 
71114.06Drill Evaluation
71114.06Drill Evaluation
Miscellaneous Documents
Miscellaneous Documents
Number             Title                                                   Date
Number
1901               Dress Rehearsal Controller Guide
Title
TSC - Position Log                                     02/05/2019
Date
Significant Events Log                                 02/05/2019
1901
Form EP-0541       Palo Verde NAN Emergency Message Form
Dress Rehearsal Controller Guide  
 
TSC - Position Log
2/05/2019
Significant Events Log
2/05/2019
Form EP-0541
Palo Verde NAN Emergency Message Form  
 
71124.05Radiation Monitoring Instrumentation
71124.05Radiation Monitoring Instrumentation
Procedures
Procedures
Number         Title                                                         Revision
Number
74DP-9CY08     Radiological Monitoring Program                               25
Title
Revision
74DP-9CY08
Radiological Monitoring Program  
 
Procedures
Procedures
Number         Title                                                         Revision
Number
74ST-9SQ23     Radiation Monitoring Calibration Test for New Scope Area     18
Title
Revision
74ST-9SQ23
Radiation Monitoring Calibration Test for New Scope Area
Monitors
Monitors
74ST-9SQ33     Radiation Monitoring Calibration Test for Main Steam Line     1
74ST-9SQ33
Radiation Monitoring Calibration Test for Main Steam Line
Monitors
Monitors
75RP-9EQ04     Calibration of the Eberline PNR-4 Neutron Dose Rate           9
75RP-9EQ04
Calibration of the Eberline PNR-4 Neutron Dose Rate
Instrument
Instrument
75RP-9EQ13     Canberra Whole Body Counting System Calibration               5
75RP-9EQ13
75RP-9EQ31     Calibration, Response Check and Operation of the SAM-12       4
Canberra Whole Body Counting System Calibration
75RP-9EQ31
Calibration, Response Check and Operation of the SAM-12
Small Article Monitor
Small Article Monitor
75RP-9EQ47     Calibration of the Eberline Model HP Series Frisker Probes   1
75RP-9EQ47
75RP-9EQ66     Calibration of the Thermo Scientific Model RO-20             1
Calibration of the Eberline Model HP Series Frisker Probes
75RP-9EQ66
Calibration of the Thermo Scientific Model RO-20
Ion Chamber Survey Meter
Ion Chamber Survey Meter
75RP-9ME05     Scaler Counting Systems Performance Checks                   20
75RP-9ME05
Scaler Counting Systems Performance Checks  
 
Audits and Self-Assessments
Audits and Self-Assessments
Number         Title                                                       Date
Number
2Q 2017         Integrated Performance Assessment Report:                   09/14/2017
Title
Date
2Q 2017
Integrated Performance Assessment Report:
Radiation Protection Department
Radiation Protection Department
2018-001       Audit Plan and Report: Chemistry                             04/06/2018
09/14/2017
218-04312       2017 Annual Radiation Protection Program Summary Report     07/11/2018
2018-001
2018-007       Audit Plan and Report: Radiation Safety                     12/14/2018
Audit Plan and Report: Chemistry
04/06/2018
218-04312
2017 Annual Radiation Protection Program Summary Report
07/11/2018
2018-007
Audit Plan and Report: Radiation Safety
2/14/2018
Condition Reports
Condition Reports
17-01400           17-02247           17-08311           17-11014         17-13020
17-01400
17-13492           17-15582           17-17353           18-02590         18-09583
17-02247
17-08311
17-11014
17-13020
17-13492
17-15582
17-17353
18-02590
18-09583
Portable Instrumentation Calibration Data Sheet
Portable Instrumentation Calibration Data Sheet
Number         Title                                                       Date
Number
4380           PNR-4/NRD-1 Calibration Data Sheet                         07/10/2018
Title
8143           RO-20 Meter Data Sheet                                     09/07/2018
Date
2708085       DRM 1/2 Calibration Data Sheet                             10/01/2018
4380
2914/12818   AMS-4 Calibration Data Sheet                               10/09/2018
PNR-4/NRD-1 Calibration Data Sheet
RAS-1 Air Sampler Calibration Data Sheet                   10/19/2018
07/10/2018
1182           RM-20 Count Rate Meter Data Sheet                           01/04/2019
8143
2927           FH 40 GL Internal Detector Calibration Data Sheet           01/15/2019
RO-20 Meter Data Sheet
09/07/2018
2708085
DRM 1/2 Calibration Data Sheet
10/01/2018
2914/12818 AMS-4 Calibration Data Sheet
10/09/2018
RAS-1 Air Sampler Calibration Data Sheet
10/19/2018
1182
RM-20 Count Rate Meter Data Sheet
01/04/2019
2927
FH 40 GL Internal Detector Calibration Data Sheet
01/15/2019  
 
Portable Instrumentation Calibration Data Sheet
Portable Instrumentation Calibration Data Sheet
Number         Title                                                       Date
Number
11499           FHZ 612 Teleprobe Detector Calibration Data Sheet           01/24/2019
Title
Date
11499
FHZ 612 Teleprobe Detector Calibration Data Sheet
01/24/2019
Stationary Radiation Instrument Calibration Records
Stationary Radiation Instrument Calibration Records
Number         Title                                                       Date
Number
668             Small Article Monitor Calibration Data Sheet                 09/18/2018
Title
FastScan2       Calibration Verification Data Sheet                         01/16/2019
Date
364             BC-4 Instrument Calibration Data Sheet                       01/22/2019
668
2983         3030P Calibration Data Sheet                                 01/23/2019
Small Article Monitor Calibration Data Sheet
24             CM-11 Calibration Data Sheet                                 01/24/2019
09/18/2018
213           PM-12 Calibration Cover Sheet                               01/31/2019
FastScan2
2020           iPCM-12 Calibration Cover Sheet                             02/05/2019
Calibration Verification Data Sheet
01/16/2019
364
BC-4 Instrument Calibration Data Sheet
01/22/2019
2983
3030P Calibration Data Sheet
01/23/2019
24
CM-11 Calibration Data Sheet
01/24/2019
213
PM-12 Calibration Cover Sheet
01/31/2019
2020
iPCM-12 Calibration Cover Sheet
2/05/2019
Calibration Source Records
Calibration Source Records
Number         Title                                                       Date
Number
N997-0358       Kaman Report of Calibration Model KDA-HR High Range         01/23/1980
Title
Date
N997-0358
Kaman Report of Calibration Model KDA-HR High Range
Area Monitor Ion Chamber Detector
Area Monitor Ion Chamber Detector
8143           Shepherd Model 89 Verification Sheet                         10/14/2018
01/23/1980
940521         CDM-21 Calibrator Verification Report                       10/24/2018
8143
Shepherd Model 89 Verification Sheet
10/14/2018
940521
CDM-21 Calibrator Verification Report
10/24/2018
Work Order Records
Work Order Records
Number         Title                                                       Date
Number
4980211         74ST9SQ343 Radiation Monitoring Calibration Test for         03/08/2018
Title
Date
4980211
74ST9SQ343 Radiation Monitoring Calibration Test for
Waste Gas Decay Tank RMC Monitor (Unit 3) RU-12
Waste Gas Decay Tank RMC Monitor (Unit 3) RU-12
4867547         74ST9SQ333 Radiation Monitoring Calibration Test for Main   04/23/2018
03/08/2018
4867547
74ST9SQ333 Radiation Monitoring Calibration Test for Main
Steam Line Monitors. (Unit 3) (RU-139/140)
Steam Line Monitors. (Unit 3) (RU-139/140)
4889856         "B" CTMT Build Refueling Purge Exhaust Monitor (Unit 1       07/25/2018
04/23/2018
4889856  
"B" CTMT Build Refueling Purge Exhaust Monitor (Unit 1
RU-34)
RU-34)
4898443         Personnel IARM A-Side (Unit 1 RU-155D)                       08/28/2018
07/25/2018
4948127         "A" Essential Cooling Water Radiation Monitor (Unit 3 RU-02) 09/13/2018
4898443
4911530         74ST9SQ232 Radiation Monitoring Calibration Test for         10/23/2018
Personnel IARM A-Side (Unit 1 RU-155D)
08/28/2018
4948127  
"A" Essential Cooling Water Radiation Monitor (Unit 3 RU-02) 09/13/2018
4911530
74ST9SQ232 Radiation Monitoring Calibration Test for
Baseline Area Monitors (Unit 2 RU-148-151)
Baseline Area Monitors (Unit 2 RU-148-151)
10/23/2018
Miscellaneous Documents
Miscellaneous Documents
Number                       Title                                             Date
Number
LS-6500 (U1, U2, & U3)       QC: Observed Source Response - dpm                 2018
Title
U1 MCA Detectors 1, 2, & 3 QC: 88 and 1332 keV Activity and 1332 keV FWHM       2018
Date
LS-6500 (U1, U2, & U3)
QC: Observed Source Response - dpm
2018
U1 MCA Detectors 1, 2, & 3 QC: 88 and 1332 keV Activity and 1332 keV FWHM
2018  
 
Miscellaneous Documents
Miscellaneous Documents
Number                       Title                                               Date
Number
U2 MCA Detectors 1, 2, & 3   QC: 88 and 1332 keV Activity and 1332 keV FWHM       2018
Title
U3 MCA Detectors 1, 2, & 3   QC: 88 and 1332 keV Activity and 1332 keV FWHM       2018
Date
237-03041-CAS               2nd Quarter 2018 Chemistry Hot Cross Checks         07/27/2018
U2 MCA Detectors 1, 2, & 3 QC: 88 and 1332 keV Activity and 1332 keV FWHM
237-03046-CAS               4th Quarter 2018 Chemistry Hot Cross Checks         01/22/2019
2018
U3 MCA Detectors 1, 2, & 3 QC: 88 and 1332 keV Activity and 1332 keV FWHM
2018
237-03041-CAS
2nd Quarter 2018 Chemistry Hot Cross Checks
07/27/2018
237-03046-CAS
4th Quarter 2018 Chemistry Hot Cross Checks
01/22/2019
71124.06Radioactive Gaseous and Liquid Effluent Treatment
71124.06Radioactive Gaseous and Liquid Effluent Treatment
Procedures
Procedures
Number             Title                                                         Revision
Number
74AL-9SQ01         Radiation Monitoring Systems Alarm Validation and Response     001
Title
74RM-9EF20         Gaseous Radioactive Release Permits and Offsite Dose           018
Revision
74AL-9SQ01
Radiation Monitoring Systems Alarm Validation and Response 001
74RM-9EF20
Gaseous Radioactive Release Permits and Offsite Dose
Assessment
Assessment
74RM-9EF23         Secondary System Liquid Discharge                             016
018
74RM-9EF40         Radiation Monitoring System Operations                         012
74RM-9EF23
74RM-9EF41         Radiation Monitoring System Alarm Response                     023
Secondary System Liquid Discharge
74RM-9EF42         Radiation Monitor Alarm Setpoint Determination                 033
016
74RM-9EF43         Actions for Non-Functional Radiation Monitors: Preplanned     017
74RM-9EF40
Radiation Monitoring System Operations
2
74RM-9EF41
Radiation Monitoring System Alarm Response
23
74RM-9EF42
Radiation Monitor Alarm Setpoint Determination
033
74RM-9EF43
Actions for Non-Functional Radiation Monitors: Preplanned
Alternate Sampling Program
Alternate Sampling Program
74RM-9EF60         RMS Sample Collection                                         032
017
74RM-9EF63         RU-143 Sample Operations                                       001
74RM-9EF60
74RM-9EF65         RU-145 Sample Operations                                       000
RMS Sample Collection
74RM-9EF80         RMS/Effluent Action Documentation                             006
2
75RM-9EF01         Determination of Primary-to-Secondary Leak Rate               000
74RM-9EF63
RU-143 Sample Operations
001
74RM-9EF65
RU-145 Sample Operations
000
74RM-9EF80
RMS/Effluent Action Documentation
006
75RM-9EF01
Determination of Primary-to-Secondary Leak Rate
000
Audits and Self-Assessments
Audits and Self-Assessments
Number             Title                                                     Date
Number
17-11047-003       Radiological Monitoring Program                           09/07/2017
Title
2018-001           Nuclear Assurance Department (NAD): Chemistry             04/06/2018
Date
2018-04312         2017 Annual Radiation Protection Program Summary           07/11/2018
17-11047-003
Radiological Monitoring Program
09/07/2017
2018-001
Nuclear Assurance Department (NAD): Chemistry
04/06/2018
2018-04312
2017 Annual Radiation Protection Program Summary
Report
Report
2018-007           Nuclear Assurance Department (NAD): Radiation Safety       12/14/2018
07/11/2018
2018-007
Nuclear Assurance Department (NAD): Radiation Safety
2/14/2018
Condition Reports
Condition Reports
16-02244           17-0299           17-01573           17-01926           17-05289
16-02244
17-07961           17-11047           17-11559           17-13603           17-17884
17-0299
18-02621           18-04140           18-04530           18-06915           18-08466
17-01573
18-09004           18-11148           18-12193           18-13299           18-14265
17-01926
18-14342           18-17591           19-00212           19-01531
17-05289
17-07961
17-11047
17-11559
17-13603
17-17884
18-02621
18-04140
18-04530
18-06915
18-08466
18-09004
18-11148
18-12193
18-13299
18-14265
18-14342
18-17591
19-00212
19-01531  
 
Effluent Monitor Calibration Records
Effluent Monitor Calibration Records
Number               Title                                             Date
Number
STWO 04715454 RU-145 Unit 2 Fuel Building B Vent Exhaust Monitor Low   02/22/2017
Title
STWO 04736183 RU-143 Unit 3 Plant Vent Monitor Low                     04/22/2017
Date
STWO 04760261 RU-146 Unit 3 Fuel Building B Vent Exhaust Monitor High   05/10/2017
STWO 04715454
RU-145 Unit 2 Fuel Building B Vent Exhaust Monitor Low
2/22/2017
STWO 04736183
RU-143 Unit 3 Plant Vent Monitor Low
04/22/2017
STWO 04760261
RU-146 Unit 3 Fuel Building B Vent Exhaust Monitor High
Calibration
Calibration
STWO 04863095 RU-144 Unit 1 Plant Vent Monitor High                     09/15/2017
05/10/2017
STWO 04980503 RU-12 Unit 1 Waste Gas Decay Tank Monitor                 03/19/2018
STWO 04863095
STWO 04904815 RU-143 Unit 2 Plant Vent Monitor Low                     09/20/2018
RU-144 Unit 1 Plant Vent Monitor High
09/15/2017
STWO 04980503
RU-12 Unit 1 Waste Gas Decay Tank Monitor
03/19/2018
STWO 04904815
RU-143 Unit 2 Plant Vent Monitor Low
09/20/2018
Air Cleaning System Surveillance Test Records
Air Cleaning System Surveillance Test Records
Number           Title                                                 Date
Number
STWO 4777407 Unit 1 Containment Building Purge Air Filtration Unit     09/06/2017
Title
STWO 4813386 Unit 2 Fuel and Aux Building Essential Air Filtration Unit 12/21/2017
Date
STWO 4836778 Unit 1 Fuel and Aux Building Essential Air Filtration Unit 02/09/2018
STWO 4777407 Unit 1 Containment Building Purge Air Filtration Unit
STWO 4866355 Unit 3 Fuel and Aux Building Essential Air Filtration Unit 05/29/2018
09/06/2017
STWO 4813386 Unit 2 Fuel and Aux Building Essential Air Filtration Unit
2/21/2017
STWO 4836778 Unit 1 Fuel and Aux Building Essential Air Filtration Unit
2/09/2018
STWO 4866355 Unit 3 Fuel and Aux Building Essential Air Filtration Unit
05/29/2018
Gaseous Discharge Permits
Gaseous Discharge Permits
Number               Title                                             Date
Number
20172058             Unit 2 Refueling Purge                             05/02/2017
Title
20182030             Unit 2 Plant Vent                                 03/15/2018
Date
20182103             Unit 2 Fuel Building Vent                         09/11/2018
20172058
20181142             Unit 1 Plant Vent                                 11/08/2018
Unit 2 Refueling Purge
20181145             Unit 1 Fuel Building Vent                         11/20/2018
05/02/2017
20191015             Unit 1 Fuel Building Vent                         01/29/2019
20182030
20192013             Unit 2 Plant Vent                                 01/31/2019
Unit 2 Plant Vent
20192015             Unit 2 Fuel Building Vent                         02/05/2019
03/15/2018
20182103
Unit 2 Fuel Building Vent
09/11/2018
20181142
Unit 1 Plant Vent
11/08/2018
20181145
Unit 1 Fuel Building Vent
11/20/2018
20191015
Unit 1 Fuel Building Vent
01/29/2019
20192013
Unit 2 Plant Vent
01/31/2019
20192015
Unit 2 Fuel Building Vent
2/05/2019
Counting Detector Calibrations
Counting Detector Calibrations
Number     Title                                                       Date
Number
GMAR4L HpGE Geometry - Unit 3 4500 cc gas Marinelli beaker             01/14/2016
Title
PFIL1       HpGE Geometry - Unit 1 Particulate filer on shelf 1         07/20/2016
Date
CCART1 HpGE Geometry - Unit 1 F&J cartridge on shelf 1                 07/22/2016
GMAR4L
CP1001     HpGE Geometry - Unit 2 CP100 charcoal face down shelf 1     11/21/2017
HpGE Geometry - Unit 3 4500 cc gas Marinelli beaker
GMAR1L HpGE Geometry - Unit 1 Gas 1L Marinelli beaker on detector face 12/08/2017
01/14/2016
GVIAL1     HpGE Geometry - Unit 2 9.2 cc gas vial shelf 1             12/14/2017
PFIL1
HpGE Geometry - Unit 1 Particulate filer on shelf 1
07/20/2016
CCART1
HpGE Geometry - Unit 1 F&J cartridge on shelf 1
07/22/2016
CP1001
HpGE Geometry - Unit 2 CP100 charcoal face down shelf 1
11/21/2017
GMAR1L
HpGE Geometry - Unit 1 Gas 1L Marinelli beaker on detector face
2/08/2017
GVIAL1
HpGE Geometry - Unit 2 9.2 cc gas vial shelf 1
2/14/2017
Miscellaneous Documents
Miscellaneous Documents
Number               Title                                             Date
Number
Palo Verde Generating Station Daily Status Report 02/5-8/2019
Title
Date
Palo Verde Generating Station Daily Status Report
2/5-8/2019  
 
Miscellaneous Documents
Miscellaneous Documents
Number             Title                                                   Date
Number
Offsite Dose Calculation Manual (ODCM) Palo Verde       03/24/2016
Title
Date
Offsite Dose Calculation Manual (ODCM) Palo Verde
Nuclear Generating Station Units 1, 2, and 3
Nuclear Generating Station Units 1, 2, and 3
RCTSAI 1566         2016 Annual Radioactive Effluent Release Report         04/15/2017
03/24/2016
2-17-014           Waste Stream Report: Unit 2 Dry Active Waste           04//18/2017
RCTSAI 1566
1-17-042           Waste Stream Report: Unit 1 Dry Active Waste           10/28/2017
2016 Annual Radioactive Effluent Release Report
3-18-040           Waste Stream Report: Unit 3 Dry Active Waste           04/15/2018
04/15/2017
RCTSAI 1566         2017 Annual Radioactive Effluent Release Report         04/25/2018
2-17-014
Waste Stream Report: Unit 2 Dry Active Waste
04//18/2017
1-17-042
Waste Stream Report: Unit 1 Dry Active Waste
10/28/2017
3-18-040
Waste Stream Report: Unit 3 Dry Active Waste
04/15/2018
RCTSAI 1566
2017 Annual Radioactive Effluent Release Report
04/25/2018
71124.07Radiological Environmental Monitoring Program
71124.07Radiological Environmental Monitoring Program
Procedures
Procedures
Number             Title                                                   Revision
Number
74RM-0EN02         Radiological Environmental Air Sampling                 21
Title
74RM-0EN03         Radiological Environmental Sampling                     33
Revision
74RM-0EN05         Environmental TLD Exchange/Reporting                   15
74RM-0EN02
74RM-0EN07         Land Use Census                                         14
Radiological Environmental Air Sampling
74RM-0EN03
Radiological Environmental Sampling
74RM-0EN05
Environmental TLD Exchange/Reporting
74RM-0EN07
Land Use Census  
 
Audits and Self-Assessments
Audits and Self-Assessments
Number             Title                                                   Date
Number
Integrated Performance Assessment Report - Radiation   06/22/2017
Title
Date
Integrated Performance Assessment Report - Radiation
Protection Department Quarter #1
Protection Department Quarter #1
Integrated Performance Assessment Report - Radiation   09/14/2017
06/22/2017
Integrated Performance Assessment Report - Radiation
Protection Department Quarter #2
Protection Department Quarter #2
Integrated Performance Assessment Report - Radiation   12/19/2017
09/14/2017
Integrated Performance Assessment Report - Radiation
Protection Department Quarter #3
Protection Department Quarter #3
Integrated Performance Assessment Report - Radiation   03/09/2018
2/19/2017
Integrated Performance Assessment Report - Radiation
Protection Department Quarter #4
Protection Department Quarter #4
218-04312           Annual Radiation Protection Program Summary Report     07/11/2018
03/09/2018
Integrated Performance Assessment Report - Radiation   08/15/2018
218-04312
Annual Radiation Protection Program Summary Report
07/11/2018
Integrated Performance Assessment Report - Radiation
Protection 1st Half 2018
Protection 1st Half 2018
SWMS                Groundwater Protection Initiative NEW 07-07            12/06/2018
08/15/2018
SWMS
No. 15-04023-003
No. 15-04023-003
2018-007           Nuclear Assurance Department (NAD) Audit Plan and       12/14/2018
Groundwater Protection Initiative NEW 07-07
2/06/2018
2018-007
Nuclear Assurance Department (NAD) Audit Plan and
Report - Radiation Safety
Report - Radiation Safety
2/14/2018
Condition Reports
Condition Reports
17-00760           17-01085             17-01203         17-01859       17-03281
17-00760
17-03798           17-04052             17-04054         17-04212       17-04747
17-01085
17-06259           17-07102             17-07269         17-08535       17-10101
17-01203
17-10463           17-10476             17-10693         17-15048       17-17823
17-01859
17-03281
17-03798
17-04052
17-04054
17-04212
17-04747
17-06259
17-07102
17-07269
17-08535
17-10101
17-10463
17-10476
17-10693
17-15048
17-17823  
 
Condition Reports
Condition Reports
17-18260           18-00109           18-00633           18-01069           18-01383
17-18260
18-01500           18-01583           18-03310           18-04530           18-06018
18-00109
18-10111           18-10649           18-10739           18-11127           18-11210
18-00633
18-12934           18-14265           18-15019
18-01069
Groundwater Protection Documents                                             Revision
18-01383
Number             Title                                                     or Date
18-01500
75DP-9AP01         Ground Water Protection Program                         0
18-01583
SWMS No.           Groundwater Protection Initiative NEI 07-07              12/06/2018
18-03310
18-04530
18-06018
18-10111
18-10649
18-10739
18-11127
18-11210
18-12934
18-14265
18-15019  
 
Groundwater Protection Documents
Revision
or Date
Number
Title
75DP-9AP01
Ground Water Protection Program
SWMS No.
15-04023-003
15-04023-003
Groundwater Protection Initiative NEI 07-07
2/06/2018
Meteorological Calibration Records
Meteorological Calibration Records
Number             Title                                                     Date
Number
WO 4905809         Met System Redundant Cab                                 12/12/2017
Title
WO 4905809         Met System Primary Cab A                                 11/06/2017
Date
WO 4988254         Met System Calibration (Primary System)                   10/10/2018
WO 4905809
WO 4988280         Met System Calibration (Redundant System)                 10/10/2018
Met System Redundant Cab
2/12/2017
WO 4905809
Met System Primary Cab A
11/06/2017
WO 4988254
Met System Calibration (Primary System)
10/10/2018
WO 4988280
Met System Calibration (Redundant System)
10/10/2018
Miscellaneous Documents
Miscellaneous Documents
Number             Title                                                     Date
Number
2016               Annual Radiological Environmental Operating Report       04/14/2017
Title
2017               Annual Radiological Environmental Operating Report       04/10/2018
Date
2016
Annual Radiological Environmental Operating Report
04/14/2017
2017
Annual Radiological Environmental Operating Report
04/10/2018
71124.08Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,
71124.08Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,
and Transportation
and Transportation
Procedures
Procedures
Number             Title                                                         Revision
Number
75RP-9RP15         Control and Storage of Radioactive Material and Radioactive   30
Title
Revision
75RP-9RP15
Control and Storage of Radioactive Material and Radioactive
Wastes
Wastes
76DP-0AP12         Low Level Radioactive Material Storage Facility Overview       3
76DP-0AP12
76-DP-0RP01         Radioactive Waste Management Program Overview                 7
Low Level Radioactive Material Storage Facility Overview
76-DP-0RP03         Radwaste Process Control Program                               9
76-DP-0RP01
76-RP-0RW03         Waste Stream Sampling and Database Maintenance                 2
Radioactive Waste Management Program Overview
76-RP-0RW05         Packaging and Classification of Radioactive Waste             6
76-DP-0RP03
76-RP-0RW06         Packaging of Radioactive Material                             5
Radwaste Process Control Program
76-RP-0RW07         Shipping Radioactive Materials                                 16
76-RP-0RW03
76-RP-0RW08         High Integrity Container Receipt, Handling, Use, and Closure   4
Waste Stream Sampling and Database Maintenance
76-RP-0RW09         Transfer, Storage and Processing of Radioactive Filters       8
76-RP-0RW05
Packaging and Classification of Radioactive Waste
76-RP-0RW06
Packaging of Radioactive Material
76-RP-0RW07
Shipping Radioactive Materials
76-RP-0RW08
High Integrity Container Receipt, Handling, Use, and Closure 4
76-RP-0RW09
Transfer, Storage and Processing of Radioactive Filters  
 
Procedures
Procedures
Number             Title                                                       Revision
Number
76-RP-0RW10         Handling and Storage of Radioactively Contaminated           3
Title
Revision
76-RP-0RW10
Handling and Storage of Radioactively Contaminated
Chemical Waste and Mixed Waste
Chemical Waste and Mixed Waste
76-RP-0RW82         Self-Engaging Rapid Dewatering System (SERDS)               4
76-RP-0RW82
Self-Engaging Rapid Dewatering System (SERDS)
Operation
Operation
91-DP-0EN50-02     Waste Stream Characterization Administrative Guideline       0
91-DP-0EN50-02
Waste Stream Characterization Administrative Guideline  
 
Audits and Self-Assessments
Audits and Self-Assessments
Number     Title                                                             Date
Number
202       NUPIC Audit: WMG, Inc.                                           03/18/2016
Title
24365       NUPIC Audit: Energy Solutions                                     12/04/2017
Date
2017-002 NAD Audit: Procurement and Material Control                         05/05/2017
202
2018-007 NAD Audit: Radiation Safety                                         12/14/2018
NUPIC Audit: WMG, Inc.
2-03734 January 2018 Offsite Safety Review Committee Meeting 18-001,       01/26/2018
03/18/2016
24365
NUPIC Audit: Energy Solutions
2/04/2017
2017-002
NAD Audit: Procurement and Material Control
05/05/2017
2018-007
NAD Audit: Radiation Safety
2/14/2018
2-03734 January 2018 Offsite Safety Review Committee Meeting 18-001,
Operations, Chemistry and Radiation Protection Subcommittee
Operations, Chemistry and Radiation Protection Subcommittee
Report
Report
01/26/2018
Shipping Packages
Shipping Packages
17-RW-004         17-SH-036         17-SH-055         17-SH-068         18-RW-009
17-RW-004
18-RW-020         18-RW-022         18-RW-026         18-RW-028         18-RW-034
17-SH-036
18-SH-018         18-SH-062
17-SH-055
17-SH-068
18-RW-009
18-RW-020
18-RW-022
18-RW-026
18-RW-028
18-RW-034
18-SH-018
18-SH-062  
 
Condition Reports
Condition Reports
17-02737           17-04797         17-12153           17-13693           17-17333
17-02737
17-18114           18-00790         18-03801           18-07057
17-04797
Surveys
17-12153
Survey Number       Title                                                 Date
17-13693
0-M-20190110-1       DAWPS Processing Area Monthly Survey                 01/10/2019
17-17333
0-M-20190110-3       LLRMSF Monthly Survey                                 01/10/2019
17-18114
0-M-20190102-2       DAWPS Monthly Yard Survey                             01/10/2019
18-00790
0-M-20190123-1       DAWPS Storage Area Monthly Routine Survey             01/23/2019
18-03801
Sample Analyses
18-07057  
Type                           Sample ID                                   Date
 
Unit 1 DAW                     1-17-042                                   12/28/2018
Surveys  
Unit 2 DAW                     2-17-014                                   12/28/2018
 
Unit 3 DAW                     3-18-040                                   12/28/2018
Survey Number
Unit 2 Oil                     2-18-037                                   09/01/2017
Title
Date
0-M-20190110-1
DAWPS Processing Area Monthly Survey
01/10/2019
0-M-20190110-3
LLRMSF Monthly Survey
01/10/2019
0-M-20190102-2
DAWPS Monthly Yard Survey
01/10/2019
0-M-20190123-1
DAWPS Storage Area Monthly Routine Survey
01/23/2019
Sample Analyses  
 
Type
Sample ID
Date
Unit 1 DAW
1-17-042
2/28/2018
Unit 2 DAW
2-17-014
2/28/2018
Unit 3 DAW
3-18-040
2/28/2018
Unit 2 Oil
2-18-037
09/01/2017  
 
Miscellaneous Documents
Miscellaneous Documents
Number           Title                                           Date
Number
NBA11C000113 Radiation Protection Technician Training             08/14/2018
Title
Date
NBA11C000113 Radiation Protection Technician Training
Program: Packaging Radioactive Material
Program: Packaging Radioactive Material
NBA19C000109 Radiation Protection Technician Training             07/31/2015
08/14/2018
NBA19C000109 Radiation Protection Technician Training
Program: Shipping Radioactive Material
Program: Shipping Radioactive Material
2016 Annual Radioactive Effluent Release Report 04/15/2017
07/31/2015
2017 Annual Radioactive Effluent Release Report 04/15/2018
2016 Annual Radioactive Effluent Release Report
Employee Training Records: Shipping Radioactive 03/31/2017 and
04/15/2017
Material                                        08/11/2017
2017 Annual Radioactive Effluent Release Report
Waste Control Specialist Generator Certification 11/03/2017 and
04/15/2018
Approval Letter                                  09/07/2018
Employee Training Records: Shipping Radioactive
Material
03/31/2017 and
08/11/2017
Waste Control Specialist Generator Certification
Approval Letter
11/03/2017 and
09/07/2018
71151Performance Indicator Verification
71151Performance Indicator Verification
Miscellaneous Documents
Miscellaneous Documents
Number             Title                                           Revision
Number
NEI 99-02         Regulatory Performance Indicator Document       7
Title
Revision
NEI 99-02
Regulatory Performance Indicator Document  
 
71152Problem Identification and Resolution
71152Problem Identification and Resolution
Condition Reports
Condition Reports
19-00802         18-18324           18-19112           18-15793   18-18212
19-00802
19-02376         19-02956           19-03063
18-18324
18-19112
18-15793
18-18212
19-02376
19-02956
19-03063  
 
Work Orders
Work Orders
4481512     5101889
4481512
5101889  
 
Procedures
Procedures
Number             Title                                           Revision
Number
36ST-9SA05         FBEVAS, CREFAS, and CRVIAS 18 month Functional   24
Title
Revision
36ST-9SA05
FBEVAS, CREFAS, and CRVIAS 18 month Functional
Test
Test
40OP-9SA01         BOP ESFAS Modules Operation                     32
40OP-9SA01
40OP-9SA02         De-Energization of BOP ESFAS                     25
BOP ESFAS Modules Operation
40AL-9RK5A         Panel B05A Alarm Response                       2
40OP-9SA02
40DP-9OP06         Operations Department Repetitive Task Program   130
De-Energization of BOP ESFAS
40AL-9RK5A
Panel B05A Alarm Response
40DP-9OP06
Operations Department Repetitive Task Program
130
Drawings
Drawings
Number             Title                                           Revision
Number
01-E-SAB-004       Elementary Diagram ESF Actuation System BOP-     1
Title
ESFAS Intertying Circuits Train A & Train B
Revision
01-E-SAB-004
Elementary Diagram ESF Actuation System BOP-
ESFAS Intertying Circuits Train A & Train B  
 
Miscellaneous Documents
Miscellaneous Documents
Number           Title                                                 Revision
Number
PVNGS Updated FSAR                                     19
Title
Revision
PVNGS Updated FSAR  
 
4OA5Other Activities (IP 60854)
4OA5Other Activities (IP 60854)
Condition Reports
Condition Reports
19-04069
19-04069  
 
Procedures
Procedures
Number             Title                                               Revision
Number
GQP 9.0             PCI Training, Qualification, Examination, and         20
Title
Revision
GQP 9.0
PCI Training, Qualification, Examination, and
Certification of NDE Personnel
Certification of NDE Personnel
GQP 9.1             PCI Training, Qualification, Examination, and         6
GQP 9.1
PCI Training, Qualification, Examination, and
Certification of Inspection and Testing Personnel
Certification of Inspection and Testing Personnel
GQP 9.2             PCI High Temperature Liquid Penetrant Examination     10
GQP 9.2
PCI High Temperature Liquid Penetrant Examination
and Acceptance Standards for Welds
and Acceptance Standards for Welds
GQP 9.7             PCI Liquid Penetrant Examination and Acceptance       19
GQP 9.7
PCI Liquid Penetrant Examination and Acceptance
Standards for Welds (40 - 125 degrees F)
Standards for Welds (40 - 125 degrees F)
GQP 9.6             PCI Visual Examination of Welds                       18
GQP 9.6
75DC-9SF02         Radiation Protection for Magnastor                   0
PCI Visual Examination of Welds
PI-CNSTR-OP-PV-     Closure Welding of Magnastor Canisters for PV        1
75DC-9SF02
Radiation Protection for Magnastor
PI-CNSTR-OP-PV-
NMS-01
NMS-01
30DP-9MP23         Foreign Material Exclusion Controls                   6
Closure Welding of Magnastor Canisters for PV
MSLT-PCI-PV         Helium Mass Spectrometer Leak Test Procedure         4108-0
30DP-9MP23
Foreign Material Exclusion Controls
MSLT-PCI-PV
Helium Mass Spectrometer Leak Test Procedure
4108-0
Design Basis Documents
Design Basis Documents
Number             Title                                               Revision
Number
ISFSI FSAR         NAC Magnastor Final Safety Analysis Report           10
Title
CoC 1031           CoC and Technical Specifications for Magnastor       Amendment 7
Revision
ISFSI FSAR
NAC Magnastor Final Safety Analysis Report
CoC 1031
CoC and Technical Specifications for Magnastor
System
System
Miscellaneous Documents                                                 Revision
Amendment 7
Number           Title                                                 or Date
Miscellaneous Documents
Q-16A             Leak Test Specialist NDE LT Level III Personnel       09/19/2018
Revision
or Date
Number
Title
Q-16A
Leak Test Specialist NDE LT Level III Personnel
Certificate
Certificate
SAP #27044       PCI NDE VT/PT Level II Personnel Certificate           01/15/2019
09/19/2018
CMTRs             Spotcheck Penetrant, SKL-SP2 Spotcheck Developer       Various dates
SAP #27044
PCI NDE VT/PT Level II Personnel Certificate
01/15/2019
CMTRs
Spotcheck Penetrant, SKL-SP2 Spotcheck Developer
SKD-S2, SKC-S, and Sherwin Certification for D-100, D-
SKD-S2, SKC-S, and Sherwin Certification for D-100, D-
350, KO-17, KO-19 Liquid Penetrant Materials
350, KO-17, KO-19 Liquid Penetrant Materials
Certificate of   #915501-02 Various Welding Shims and Wire             Various dates
Various dates
Compliance
Certificate of
Miscellaneous Documents                                               Revision
Compliance
Number           Title                                               or Date
#915501-02 Various Welding Shims and Wire
MC-GTAW         PCI Welding Procedure Specification Machine Gas     16
Various dates  
 
Miscellaneous Documents
Revision
or Date
Number
Title
MC-GTAW
PCI Welding Procedure Specification Machine Gas
Tungsten Arc Welding
Tungsten Arc Welding
PQR-62           PCI Procedure Qualification Record for WPS 8       3
PQR-62
PQE-63           PCI Procedure Qualification Record for Manual GTAW 6
PCI Procedure Qualification Record for WPS 8
PQR-600           PCI Procedure Qualification Record for Machine GTAW 8
PQE-63
PQR-899           PCI Procedure Qualification Record for Machine 8   4
PCI Procedure Qualification Record for Manual GTAW
GTAW
PQR-600
PCI Procedure Qualification Record for Machine GTAW
PQR-899
PCI Procedure Qualification Record for Machine 8
GTAW  
 
The following items are requested for the
The following items are requested for the
Public Radiation Safety Inspection
Public Radiation Safety Inspection
at Palo Verde
at Palo Verde  
 
Dates of Inspection: 02/04/2019 to 02/08/2019
Dates of Inspection: 02/04/2019 to 02/08/2019
Integrated Report 2019001
Integrated Report 2019001
Line 890: Line 1,610:
file the information can be found.
file the information can be found.
If you have any questions or comments, please contact Natasha Greene at 817-200-1154 or via
If you have any questions or comments, please contact Natasha Greene at 817-200-1154 or via
e-mail at Natasha.Greene@nrc.gov.
e-mail at Natasha.Greene@nrc.gov.  
 
PAPERWORK REDUCTION ACT STATEMENT
PAPERWORK REDUCTION ACT STATEMENT
This letter does not contain new or amended information collection requirements subject
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget,
collection requirements were approved by the Office of Management and Budget,
control number 3150-0011.
control number 3150-0011.  
5. Radiation Monitoring Instrumentation (71124.05)
 
Date of Last Inspection:         January 23, 2017
5.
A. List of contacts and telephone numbers for the following areas below. Please include
Radiation Monitoring Instrumentation (71124.05)
Date of Last Inspection:
January 23, 2017
A.
List of contacts and telephone numbers for the following areas below. Please include
area code and prefix. If work cell numbers are appropriate, then please include them as
area code and prefix. If work cell numbers are appropriate, then please include them as
well.
well.
Line 907: Line 1,632:
4. Count room and Laboratory instrument calibrations (Include RP and Chemistry, as
4. Count room and Laboratory instrument calibrations (Include RP and Chemistry, as
applicable)
applicable)
5. EP contacts for Equipment Important to Emergency Response/Preparedness
5. EP contacts for Equipment Important to Emergency Response/Preparedness  
      (EITER)
(EITER)
6. Licensing/Regulatory Affairs
6. Licensing/Regulatory Affairs
: [[contact::B. Applicable organization charts]], including position or job titles. Please include as
B.
Applicable organization charts, including position or job titles. Please include as
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),
Engineering, and Emergency Protection. (Recent pictures are appreciated.)
Engineering, and Emergency Protection. (Recent pictures are appreciated.)
: [[contact::C. Copies of audits]], self-assessments, vendor or NUPIC audits for contractor support,
C.
Copies of audits, self-assessments, vendor or NUPIC audits for contractor support,
LARs, and LERs, performed since the date of the last inspection, related to:
LARs, and LERs, performed since the date of the last inspection, related to:
1. Portable Radiation instruments: Area radiation monitors, portable continuous air
1. Portable Radiation instruments: Area radiation monitors, portable continuous air
Line 920: Line 1,647:
2. Stationary Radiation Instruments: Portal monitors, small article monitors, personnel
2. Stationary Radiation Instruments: Portal monitors, small article monitors, personnel
contamination monitors, or whole body counters
contamination monitors, or whole body counters
3. Installed Radiation Instruments: Area radiation monitors (RMS), process monitors
3. Installed Radiation Instruments: Area radiation monitors (RMS), process monitors  
      (non-effluent), criticality monitors, accident monitors
(non-effluent), criticality monitors, accident monitors
4. Count Room instrumentation (Chemistry and RP, if separate RP Ops and Effluents):
4. Count Room instrumentation (Chemistry and RP, if separate RP Ops and Effluents):
Gamma Spec, LSC, Gross Alpha, Gross Beta, including bench-top counters
Gamma Spec, LSC, Gross Alpha, Gross Beta, including bench-top counters
D. Procedure indexes for radiation protection procedures and other related disciplines.
D.
Procedure indexes for radiation protection procedures and other related disciplines.
1. Calibration, use, and operation of continuous air monitors, portable survey
1. Calibration, use, and operation of continuous air monitors, portable survey
instruments, temporary area radiation monitors, electronic dosimeters, teledosimetry
instruments, temporary area radiation monitors, electronic dosimeters, teledosimetry
Line 931: Line 1,659:
3. Calibration of installed area radiation monitors, process monitors, criticality monitors,
3. Calibration of installed area radiation monitors, process monitors, criticality monitors,
and accident monitors
and accident monitors
4. Calibration use and operation of Count Room instrumentation (GS, LSC, GA, GB)
4. Calibration use and operation of Count Room instrumentation (GS, LSC, GA, GB)  
      (include bench top counters here)
(include bench top counters here)
NOTE: Please ensure that RP, Chemistry, and I&C procedures are included, as
NOTE: Please ensure that RP, Chemistry, and I&C procedures are included, as
appropriate.
appropriate.
E. Please provide specific procedures related to the following areas noted below.
E.
Please provide specific procedures related to the following areas noted below.
Additional procedures may be requested by number after the inspector reviews the
Additional procedures may be requested by number after the inspector reviews the
procedure index.
procedure index.
1. Calibration of portable ion chambers
1. Calibration of portable ion chambers
2. Calibration of Friskers
2. Calibration of Friskers
3. Calibration of telescoping high range instruments
3. Calibration of telescoping high range instruments  
 
4. Calibration of portable neutron instruments
4. Calibration of portable neutron instruments
5. Calibration of SAMs
5. Calibration of SAMs
Line 946: Line 1,676:
7. Laboratory instrumentation quality control
7. Laboratory instrumentation quality control
8. Calibration of Containment/Drywell high range radiation monitor
8. Calibration of Containment/Drywell high range radiation monitor
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
F.
Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
committed to relative to this program. Please include the revision and/or date for the
committed to relative to this program. Please include the revision and/or date for the
commitment and where this may be located in your current licensing basis documents.
commitment and where this may be located in your current licensing basis documents.
G. Please provide a summary list of corrective action documents (including corporate and
G.
Please provide a summary list of corrective action documents (including corporate and
sub-tiered systems) written since the date of the last inspection, related to the following
sub-tiered systems) written since the date of the last inspection, related to the following
programs:
programs:
Line 966: Line 1,698:
needed. (Excel spreadsheets are the preferred format.) If codes are used,
needed. (Excel spreadsheets are the preferred format.) If codes are used,
please provide a legend for each column where a code is used.
please provide a legend for each column where a code is used.
H. State the required calibration frequency and provide the most recent calibration data for
H.
State the required calibration frequency and provide the most recent calibration data for
the whole body counters, at least one portable survey instrument, one area radiation
the whole body counters, at least one portable survey instrument, one area radiation
monitor, one air sampler, one continuous air monitor, and one drywell/containment high-
monitor, one air sampler, one continuous air monitor, and one drywell/containment high-
range monitor.
range monitor.
: [[contact::I. Provide a list of any scheduled calibrations]], while we are onsite, for the instrumentation
I.
Provide a list of any scheduled calibrations, while we are onsite, for the instrumentation
noted in request above, in 5-I.
noted in request above, in 5-I.
J. Provide the alarm set point values for the portal and personnel contamination monitors in
J.
Provide the alarm set point values for the portal and personnel contamination monitors in
operation.
operation.
K. Radiation Monitoring System health report for the previous 12 months
K.
: [[contact::L. Provide the following lists of instruments to include make]], model, identifier (S/N or plant
Radiation Monitoring System health report for the previous 12 months
L.
Provide the following lists of instruments to include make, model, identifier (S/N or plant
ID), and location:
ID), and location:
1. Portable radiation instruments currently in use (for EADs just make, model, and
1. Portable radiation instruments currently in use (for EADs just make, model, and
Line 982: Line 1,719:
3. Installed Radiation monitors
3. Installed Radiation monitors
a. Area radiation monitors and
a. Area radiation monitors and
b. Process radiation monitors.
b. Process radiation monitors.  
                (Include their instrumentation designator, function and calibration procedure
(Include their instrumentation designator, function and calibration procedure
number and title.) Please indicate which, if any, detectors have been
number and title.) Please indicate which, if any, detectors have been  
 
replaced within the past 2 years (since the last inspection).
replaced within the past 2 years (since the last inspection).
c. Radiation instrumentation abandoned in place.
c. Radiation instrumentation abandoned in place.
d. Radiation instrumentation covered by the maintenance rule.
d. Radiation instrumentation covered by the maintenance rule.
: [[contact::M. Provide a list of sources used routinely for source check of portable]], stationary, and
M.
Provide a list of sources used routinely for source check of portable, stationary, and
installed radiation monitoring instruments.
installed radiation monitoring instruments.
N. Provide the NIST traceability and calibration or verification of the primary sources for
N.
Provide the NIST traceability and calibration or verification of the primary sources for
instrument calibration and the procedures used to achieve this.
instrument calibration and the procedures used to achieve this.
6. Radioactive Gaseous and Liquid Effluent Treatment (71124.06)
6.
Date of Last Inspection:       January 23, 2017
Radioactive Gaseous and Liquid Effluent Treatment (71124.06)
A. List of contacts and telephone numbers for the following areas. Please include area
Date of Last Inspection:
January 23, 2017
A.
List of contacts and telephone numbers for the following areas. Please include area
code and prefix. If work cell numbers are appropriate, then please include them as well.
code and prefix. If work cell numbers are appropriate, then please include them as well.
1. Radiological effluent control (liquid & gaseous) and reporting
1. Radiological effluent control (liquid & gaseous) and reporting  
        (RP, Chemistry, RW, Ops, etc.)
(RP, Chemistry, RW, Ops, etc.)
2. Effluent Monitor calibration (liquid and gaseous) and maintenance
2. Effluent Monitor calibration (liquid and gaseous) and maintenance  
        (RP, Chemistry, I&C, Maintenance, Systems Engineering, EP, etc.)
(RP, Chemistry, I&C, Maintenance, Systems Engineering, EP, etc.)
3. Engineered safety feature air cleaning systems for effluent release
3. Engineered safety feature air cleaning systems for effluent release  
        (Systems Engineering, I&C, Maintenance, etc.)
(Systems Engineering, I&C, Maintenance, etc.)
4. Licensing/Regulatory Affairs
4. Licensing/Regulatory Affairs
B. Applicable organization charts including position or job titles for the above individuals
B.
Applicable organization charts including position or job titles for the above individuals
and also for their supportive Management. Please include as appropriate for your site,
and also for their supportive Management. Please include as appropriate for your site,
Site Management, RP, Chemistry, Maintenance (I&C), Engineering, and Emergency
Site Management, RP, Chemistry, Maintenance (I&C), Engineering, and Emergency
Protection. (Recent pictures are appreciated.)
Protection. (Recent pictures are appreciated.)
: [[contact::C. Copies of audits]], self-assessments, vendor or NUPIC audits of contractor support, and
C.
Copies of audits, self-assessments, vendor or NUPIC audits of contractor support, and
LERs written since the date of the last inspection, related to:
LERs written since the date of the last inspection, related to:
1. Radioactive effluents and effluent radiation monitors
1. Radioactive effluents and effluent radiation monitors
2. Engineered Safety Feature Air cleaning systems
2. Engineered Safety Feature Air cleaning systems  
D. Procedure indexes for the following areas and related disciplines.
 
D.
Procedure indexes for the following areas and related disciplines.
1. Radioactive effluents and effluent radiation monitors (to include the flow monitors)
1. Radioactive effluents and effluent radiation monitors (to include the flow monitors)
2. Engineered Safety Feature Air cleaning systems (both TS and non-TS systems for
2. Engineered Safety Feature Air cleaning systems (both TS and non-TS systems for
effluents)
effluents)
E. Please provide specific procedures related to the following areas noted below.
E.
Please provide specific procedures related to the following areas noted below.
Additional procedures may be requested by number after the inspector reviews the
Additional procedures may be requested by number after the inspector reviews the
procedure indexes.
procedure indexes.
Line 1,024: Line 1,772:
5. Laboratory instrumentation quality control
5. Laboratory instrumentation quality control
6. In-place testing of HEPA filters and charcoal adsorbers for TS effluent exhaust
6. In-place testing of HEPA filters and charcoal adsorbers for TS effluent exhaust
systems and other effluent air-cleaning systems, but not breathing air systems
systems and other effluent air-cleaning systems, but not breathing air systems  
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
 
F.
Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
committed to relative to this program. Please include the revision and/or date for the
committed to relative to this program. Please include the revision and/or date for the
commitment and where this may be located in your current licensing basis documents.
commitment and where this may be located in your current licensing basis documents.
G. Please provide a summary list of corrective action documents (including corporate and
G.
Please provide a summary list of corrective action documents (including corporate and
sub-tiered systems) written since the date of the last inspection, associated with:
sub-tiered systems) written since the date of the last inspection, associated with:
1. Radioactive effluents
1. Radioactive effluents
Line 1,041: Line 1,792:
needed. (Excel spreadsheets are the preferred format.) If codes are used,
needed. (Excel spreadsheets are the preferred format.) If codes are used,
please provide a legend for each column where a code is used.
please provide a legend for each column where a code is used.
H. Annual Radioactive Effluent Release Reports for the latest two calendar years
H.
: [[contact::I. Current revision of the Offsite Dose Calculation Manual (or other name]], but include all
Annual Radioactive Effluent Release Reports for the latest two calendar years
I.
Current revision of the Offsite Dose Calculation Manual (or other name, but include all
parts for effluents) and any changes made since the last inspection.
parts for effluents) and any changes made since the last inspection.
J. The inter-laboratory comparison results for laboratory quality control performance of
J.
The inter-laboratory comparison results for laboratory quality control performance of
effluent sample analysis for the latest two calendar years
effluent sample analysis for the latest two calendar years
K. Effluent sampling schedule for the week of the inspection
K.
: [[contact::L. Provide the last three annual trends of vent/stack effluent flow rates]], by chart or table.
Effluent sampling schedule for the week of the inspection
M. Operations department (or other responsible dept.) log records for effluent monitors
L.
Provide the last three annual trends of vent/stack effluent flow rates, by chart or table.
M.
Operations department (or other responsible dept.) log records for effluent monitors
removed from service or out of service or a list of the same and compensatory actions
removed from service or out of service or a list of the same and compensatory actions
taken during the out of service condition.
taken during the out of service condition.
N. Listing or log of liquid and gaseous release permits since the date of the last inspection
N.
O. A list of the technical specification-required air cleaning systems with the two most
Listing or log of liquid and gaseous release permits since the date of the last inspection
O.
A list of the technical specification-required air cleaning systems with the two most
recent surveillance test dates of in-place filter testing (of HEPA filters and charcoal
recent surveillance test dates of in-place filter testing (of HEPA filters and charcoal
adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers
adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers
associated with the surveillances (and their system number/name).
associated with the surveillances (and their system number/name).
: [[contact::P. System Health Report for radiation monitoring instrumentation. Also]], please provide a
P.
System Health Report for radiation monitoring instrumentation. Also, please provide a
specific list of all effluent radiation monitors that were considered inoperable for 7 days
specific list of all effluent radiation monitors that were considered inoperable for 7 days
or more since the date of the last inspection. If applicable, please provide the relative
or more since the date of the last inspection. If applicable, please provide the relative
Special Report and condition report(s). If not covered by maintenance rule, please
Special Report and condition report(s). If not covered by maintenance rule, please
provide rationale.
provide rationale.
Q. A list of significant changes made to the gaseous and liquid effluent process monitoring
Q.
A list of significant changes made to the gaseous and liquid effluent process monitoring
system since the date of the last inspection. If applicable, please provide the
system since the date of the last inspection. If applicable, please provide the
corresponding UFSAR section in which this change was documented.
corresponding UFSAR section in which this change was documented.  
R. A list of any occurrence in which a non-radioactive system was contaminated by a
 
R.
A list of any occurrence in which a non-radioactive system was contaminated by a
radioactive system since the date of the last inspection. Please include any relevant
radioactive system since the date of the last inspection. Please include any relevant
condition report(s).
condition report(s).
S. Current Part 61 analyses for hard to detect radionuclides
S.
T. Latest Land Use Census (coordinate with 71124.07)
Current Part 61 analyses for hard to detect radionuclides
U. Effluent based procedures for EALs or EOPs.
T.
7. Radiological Environmental Monitoring Program (71124.07)
Latest Land Use Census (coordinate with 71124.07)
Date of Last Inspection:       January 23, 2017
U.
A. List of contacts and telephone numbers for the following areas. Please include area
Effluent based procedures for EALs or EOPs.
7.
Radiological Environmental Monitoring Program (71124.07)
Date of Last Inspection:
January 23, 2017
A.
List of contacts and telephone numbers for the following areas. Please include area
code and prefix. If work cell numbers are appropriate, then please include them as well.
code and prefix. If work cell numbers are appropriate, then please include them as well.
1. Radiological environmental monitoring (RP, Chemistry, I&C, etc.)
1. Radiological environmental monitoring (RP, Chemistry, I&C, etc.)
Line 1,078: Line 1,847:
3. Maintenance and calibration of the above equipment
3. Maintenance and calibration of the above equipment
4. Licensing/Regulatory Affairs
4. Licensing/Regulatory Affairs
B. Applicable organization charts including position or job titles. Please include as
B.
Applicable organization charts including position or job titles. Please include as
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),
Engineering, and Emergency Protection. (Recent pictures are appreciated.)
Engineering, and Emergency Protection. (Recent pictures are appreciated.)
: [[contact::C. Copies of audits]], self-assessments, vendor or NUPIC audits of contractor support, and
C.
Copies of audits, self-assessments, vendor or NUPIC audits of contractor support, and
LERs written since the date of the last inspection, related to:
LERs written since the date of the last inspection, related to:
1. Radiological environmental monitoring program (including contractor environmental
1. Radiological environmental monitoring program (including contractor environmental
Line 1,087: Line 1,858:
2. Environmental TLD processing facility
2. Environmental TLD processing facility
3. Meteorological monitoring program
3. Meteorological monitoring program
D. Procedure index for the following areas and other related disciplines.
D.
Procedure index for the following areas and other related disciplines.
1. Radiological environmental monitoring program
1. Radiological environmental monitoring program
2. Meteorological monitoring program
2. Meteorological monitoring program
3. Maintenance and calibration of related instrumentation, including the meteorological
3. Maintenance and calibration of related instrumentation, including the meteorological
tower
tower
E. Please provide specific procedures related to the following areas noted below.
E.
Please provide specific procedures related to the following areas noted below.
Additional procedures may be requested by number after the inspector reviews the
Additional procedures may be requested by number after the inspector reviews the
procedure indexes.
procedure indexes.
Line 1,099: Line 1,872:
3. Laboratory instrumentation quality control
3. Laboratory instrumentation quality control
4. Meteorological Tower sensor calibrations
4. Meteorological Tower sensor calibrations
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
F.
Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
committed to relative to this program. Please include the revision and/or date for the
committed to relative to this program. Please include the revision and/or date for the
commitment and where this may be located in your current licensing basis documents.
commitment and where this may be located in your current licensing basis documents.  
G. Please provide a summary list of corrective action documents (including corporate and
 
G.
Please provide a summary list of corrective action documents (including corporate and
sub-tiered systems) written since the date of the last inspection, related to the following
sub-tiered systems) written since the date of the last inspection, related to the following
programs:
programs:
Line 1,116: Line 1,892:
needed. (Excel spreadsheets are the preferred format.) If codes are used,
needed. (Excel spreadsheets are the preferred format.) If codes are used,
please provide a legend for each column where a code is used.
please provide a legend for each column where a code is used.
H. Copies of the two most recent calibration packages for the meteorological tower
H.
Copies of the two most recent calibration packages for the meteorological tower
instruments
instruments
I. Copies of the Annual Radiological Environmental Operating Reports and Land Use
I.
Copies of the Annual Radiological Environmental Operating Reports and Land Use
Census for the latest two calendar years, and current revision of the Offsite Dose
Census for the latest two calendar years, and current revision of the Offsite Dose
Calculation Manual. Please include any supportive documentation for the changes
Calculation Manual. Please include any supportive documentation for the changes
made to the ODCM since the last inspection.
made to the ODCM since the last inspection.
J. Copy of the environmental laboratorys inter-laboratory comparison program results for
J.
Copy of the environmental laboratorys inter-laboratory comparison program results for
the latest two calendar years, if not included in the Annual Radiological Environmental
the latest two calendar years, if not included in the Annual Radiological Environmental
Operating Report
Operating Report
K. Data from the environmental laboratory documenting the analytical detection sensitivities
K.
Data from the environmental laboratory documenting the analytical detection sensitivities
for the various environmental sample media (i.e., air, water, soil, vegetation, and milk)
for the various environmental sample media (i.e., air, water, soil, vegetation, and milk)
: [[contact::L. Quality Assurance audits (e.g.]], NUPIC) for contracted services
L.
M. Current NEI Groundwater Protection Initiative (GPI) Plan and status. Provide the most
Quality Assurance audits (e.g., NUPIC) for contracted services
M.
Current NEI Groundwater Protection Initiative (GPI) Plan and status. Provide the most
recent monitoring results for each monitoring well per the GPI. Provide a separate list of
recent monitoring results for each monitoring well per the GPI. Provide a separate list of
any missed samples, as applicable.
any missed samples, as applicable.
N. Technical requirements manual or licensee controlled specifications which list the
N.
Technical requirements manual or licensee controlled specifications which list the
meteorological instruments calibration requirements
meteorological instruments calibration requirements
: [[contact::O. If applicable]], per NEI 07-07, provide any reports that document any spills/leaks to
O.
If applicable, per NEI 07-07, provide any reports that document any spills/leaks to
groundwater since the date of the last inspection. Please indicate what external
groundwater since the date of the last inspection. Please indicate what external
communications were made regarding each spill/leak.
communications were made regarding each spill/leak.
P. Provide any new entries into 10 CFR 50.75(g) files since the date of the last inspection.
P.
: [[contact::Q. Please identify your three highest X/Q (chi/Q) and/or D/Q sectors]], as currently used in
Provide any new entries into 10 CFR 50.75(g) files since the date of the last inspection.
Q.
Please identify your three highest X/Q (chi/Q) and/or D/Q sectors, as currently used in
the selection of your required REMP sampling locations. If these are different values
the selection of your required REMP sampling locations. If these are different values
from your most recent meteorological assessment, please provide that assessment and
from your most recent meteorological assessment, please provide that assessment and
indicate the three highest X/Q and/or D/Q sectors per your latest assessment. Also
indicate the three highest X/Q and/or D/Q sectors per your latest assessment. Also
indicate your noted predominant and least prevalent wind direction/sector, as used in
indicate your noted predominant and least prevalent wind direction/sector, as used in
your REMP analysis.
your REMP analysis.  
R. Provide the height of the highest effluent release point. Please indicate if the height
 
R.
Provide the height of the highest effluent release point. Please indicate if the height
accounts for plant grade elevation. Please also provide the most probable atmospheric
accounts for plant grade elevation. Please also provide the most probable atmospheric
release height, if different from the highest effluent release point.
release height, if different from the highest effluent release point.
: [[contact::S. Please provide a schedule of any planned REMP sampling activities while we]], the NRC,
S.
Please provide a schedule of any planned REMP sampling activities while we, the NRC,
are scheduled to be onsite performing this inspection.
are scheduled to be onsite performing this inspection.
8. Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,
8.
Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,
and Transportation (71124.08)
and Transportation (71124.08)
Date of Last Inspection:       January 23, 2017
Date of Last Inspection:
A. List of contacts and telephone numbers for the following areas. Please include area
January 23, 2017
A.
List of contacts and telephone numbers for the following areas. Please include area
code and prefix. If work cell numbers are appropriate, then please include them as well.
code and prefix. If work cell numbers are appropriate, then please include them as well.
1. Solid Radioactive waste processing (RP, Chemistry, Ops, Maintenance, I&C,
1. Solid Radioactive waste processing (RP, Chemistry, Ops, Maintenance, I&C,
Line 1,160: Line 1,952:
radioactive waste/materials)
radioactive waste/materials)
4. Licensing/Regulatory Affairs
4. Licensing/Regulatory Affairs
B. Applicable organization charts including position or job titles. Please include as
B.
Applicable organization charts including position or job titles. Please include as
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),
Engineering, and Emergency Protection. (Recent pictures are appreciated.)
Engineering, and Emergency Protection. (Recent pictures are appreciated.)
: [[contact::C. Copies of audits]], department self-assessments, and LERs written since the date of the
C.
Copies of audits, department self-assessments, and LERs written since the date of the
last inspection, related to:
last inspection, related to:
1. Solid radioactive waste management
1. Solid radioactive waste management
2. Radioactive material/waste transportation program
2. Radioactive material/waste transportation program
D. Procedure index for the following areas and other related disciplines.
D.
Procedure index for the following areas and other related disciplines.
1. Solid radioactive waste management
1. Solid radioactive waste management
2. Radioactive material/waste transportation
2. Radioactive material/waste transportation
E. Please provide specific procedures related to the following areas noted below.
E.
Please provide specific procedures related to the following areas noted below.
Additional procedures may be requested by number after the inspector reviews the
Additional procedures may be requested by number after the inspector reviews the
procedure indexes.
procedure indexes.
Line 1,178: Line 1,974:
4. Waste characterization and classification
4. Waste characterization and classification
5. Radioactive material/waste packaging & shipping
5. Radioactive material/waste packaging & shipping
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
F.
Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
committed to relative to this program. Please include the revision and/or date for the
committed to relative to this program. Please include the revision and/or date for the
commitment and where this may be located in your current licensing basis documents.
commitment and where this may be located in your current licensing basis documents.
G. Please provide a summary list of corrective action documents (including corporate and
G.
sub-tiered systems) written since the date of the last inspection, related to:
Please provide a summary list of corrective action documents (including corporate and
sub-tiered systems) written since the date of the last inspection, related to:  
 
1. Solid radioactive waste
1. Solid radioactive waste
2. Transportation of radioactive material/waste
2. Transportation of radioactive material/waste
Line 1,193: Line 1,992:
needed. (Excel spreadsheets are the preferred format.) If codes are used,
needed. (Excel spreadsheets are the preferred format.) If codes are used,
please provide a legend for each column where a code is used.
please provide a legend for each column where a code is used.
: [[contact::H. Copies of training lesson plans for 49 CFR 172]], Subpart H, for radwaste processing,
H.
Copies of training lesson plans for 49 CFR 172, Subpart H, for radwaste processing,
packaging, and shipping
packaging, and shipping
I. Provide a summary list or log of radioactive material and radioactive waste shipments for
I.
Provide a summary list or log of radioactive material and radioactive waste shipments for
the two most recent calendar years, in addition to the current calendar year.
the two most recent calendar years, in addition to the current calendar year.
J. Please provide at least two different radioactive waste stream sample analysis results
J.
Please provide at least two different radioactive waste stream sample analysis results
and resulting scaling factors for the latest two calendar years.
and resulting scaling factors for the latest two calendar years.
K. A listing of all onsite radwaste storage facilities. Please include a summary or list of the
K.
A listing of all onsite radwaste storage facilities. Please include a summary or list of the
items stored in each facility with the most recent dose rates/surveys.
items stored in each facility with the most recent dose rates/surveys.
: [[contact::L. A list of any significant (e.g.]], DAW, resins, Type B or greater) radioactive shipments that
L.
A list of any significant (e.g., DAW, resins, Type B or greater) radioactive shipments that
will be completed during our onsite inspection period. If available, please provide the
will be completed during our onsite inspection period. If available, please provide the
applicable shipping manifests/waste characterizations and most recent surveys for each
applicable shipping manifests/waste characterizations and most recent surveys for each
shipment.
shipment.
M. A list of significant changes made to the liquid or solid radwaste processing systems
M.
A list of significant changes made to the liquid or solid radwaste processing systems
since the date of the last inspection. If applicable, please provide the corresponding
since the date of the last inspection. If applicable, please provide the corresponding
UFSAR section in which this change was documented. Provide any supportive
UFSAR section in which this change was documented. Provide any supportive
documentation for the changes made or have it readily available for review.
documentation for the changes made or have it readily available for review.
N. List of radioactive waste processing systems or equipment abandoned in place since the
N.
List of radioactive waste processing systems or equipment abandoned in place since the
last inspection.
last inspection.
O. Please provide a schedule of radioactive material or waste processing or shipment
O.
Please provide a schedule of radioactive material or waste processing or shipment
activities during the inspection week. Please indicate the current storage location of the
activities during the inspection week. Please indicate the current storage location of the
stored RAM or waste prepared for shipment, as well as any supportive surveys of its
stored RAM or waste prepared for shipment, as well as any supportive surveys of its
measured dose rates. If available, please indicate its current stated waste class.
measured dose rates. If available, please indicate its current stated waste class.  


ML19122A295
ML19122A295
SUNSI Review:         ADAMS:             Non-Publicly Available     Non-Sensitive Keyword:
SUNSI Review:
By: JDixon             Yes No       Publicly Available           Sensitive
ADAMS:
OFFICE         DRP/SRI       DRP/RI         DRP/RI         DRP/RI       C:DRS/EB1   C:DRS/EB2
Non-Publicly Available
NAME           CPeabody       DReinert       DYou           RBywater     VGaddy       GPick
Non-Sensitive
SIGNATURE       CAP           DRR           DDY             RLB           vgg         GAP
Keyword:
DATE           4/24/2019     4/29/2019     4/25/2019       4/24/2019     4/25/2019   4/25/2019
By: JDixon
OFFICE         C:DRS/OB       C:DNMS/RIB     TL:IPAT         C:DRS/RCB     C:DRP/D
Yes No
NAME           GWerner       GWarnick       RKellar         NMakris       NOKeefe
Publicly Available
SIGNATURE       GEW           JFK for       RLK             NM           NFO
Sensitive
DATE           04/25/2019     4/30/2019     4/25/2019       4/25/2019     4/30/2019
OFFICE
DRP/SRI
DRP/RI
DRP/RI
DRP/RI
C:DRS/EB1
C:DRS/EB2
NAME
CPeabody
DReinert
DYou
RBywater
VGaddy
GPick
SIGNATURE
CAP
DRR
DDY
RLB
vgg
GAP
DATE
4/24/2019
4/29/2019
4/25/2019
4/24/2019
4/25/2019
4/25/2019
OFFICE
C:DRS/OB
C:DNMS/RIB
TL:IPAT
C:DRS/RCB
C:DRP/D
NAME
GWerner
GWarnick
RKellar
NMakris
NOKeefe
SIGNATURE
GEW
JFK for
RLK
NM
NFO
DATE
04/25/2019
4/30/2019
4/25/2019
4/25/2019
4/30/2019
}}
}}

Latest revision as of 02:43, 5 January 2025

NRC Integrated Inspection Report 05000528/2019001, 05000529/2019001, 05000530/2019001, and 07200044/2019001
ML19122A295
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/30/2019
From: O'Keefe N
NRC/RGN-IV/DRP
To: Bement R
Arizona Public Service Co
References
IR 2019001
Download: ML19122A295 (41)


Text

April 30, 2019

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000528/2019001, 05000529/2019001, 05000530/2019001, AND 07200044/2019001

Dear Mr. Bement:

On March 31, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Palo Verde Nuclear Generating Station Units 1, 2, and 3 and on April 12, 2019, discussed the results of this inspection with Mr. Jack Cadogan, Senior Vice President, Site Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Neil F. OKeefe, Chief Project Branch D Division of Reactor Projects

Docket Nos. 05000528, 05000529, 05000530, and 07200044

License Nos. NPF-41, NPF-51, NPF-74

Enclosure:

Inspection Report 05000528/2019001, 05000529/2019001, 05000530/2019001, and 07200044/2019001 w/attachments:

1. Supplemental Information 2. Information Request

Enclosure U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number(s):

05000528, 05000529, 05000530, and 07200044

License Number(s):

NPF-41, NPF-51 and NPF-74

Report Number(s):

05000528/2019001, 05000529/2019001, 05000530/2019001, and

07200044/2019001

Enterprise Identifier: I-2019-001-0013

I-2019-001-0077

Licensee:

Arizona Public Service Co.

Facility:

Palo Verde Nuclear Generating Station and Independent Spent Fuel

Storage Installation

Location:

5801 South Wintersburg Road, Tonopah, AZ 85354

Inspection Dates:

January 1, 2019, to March 31, 2019

Inspectors:

C. Peabody, Senior Resident Inspector

D. Reinert, Resident Inspector

D. You, Resident Inspector

R. Bywater, Resident Inspector

R. Alexander, Senior Project Engineer

L. Carson, Senior Health Physicist

P. Elkmann, Senior Emergency Preparedness Inspector

N. Greene, PhD, Senior Health Physicist

S. Hedger, Emergency Preparedness Inspector

J. O'Donnell, Health Physicist

C. Alldredge, Allegations/Enforcement Specialist

B. Baca, Health Physicist

O. Masnyk Bailey, Health Physicist (Region I)

K. Warner, Health Physicist, (Region I)

Approved By:

Neil OKeefe, Chief,

Project Branch D,

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting baseline inspections at Palo Verde Nuclear Generating Station Units 1, 2, and 3 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

NRC-identified and self-revealed findings, violations, and additional items are summarized in the table below. Licensee-identified non-cited violations are documented in the Inspection Results at the end of this report.

List of Findings and Violations

No findings were identified.

Additional Tracking Items

None.

PLANT STATUS

Units 1, 2, and 3 operated at or near full power for the duration of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.02) (1 Sample)

The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of extreme high temperatures.

71111.04 - Equipment Alignment

Partial Walkdown (IP Section 02.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 3 containment spray system B, on January 24, 2019
(2) Unit 3 diesel generators A and B jacket water cooling systems, on February 1, 2019
(3) Unit 3 loss of power sequencer A, on March 22, 2019

71111.05Q - Fire Protection

Quarterly Inspection (IP Section 03.01) (6 Samples)

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Unit 3 non-class switchgear and battery rooms, Fire Area TB4, on January 16, 2019
(2) Unit 2 auxiliary feedwater A room, Fire Area 72, on January 17, 2019
(3) Unit 1 auxiliary feedwater B room, Fire Area 73, on February 20, 2019
(4) Unit 3 auxiliary feedwater A room, Fire Area 72, on March 22, 2019
(5) Unit 1 auxiliary feedwater A room, Fire Area 72, on March 25, 2019
(6) Unit 1 Class 1E switchgear B room, Fire Area 5B, on March 29, 2019

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 02.02a.) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the 80 and 100 elevations of the Unit 1, 2, and 3 main steam support structures on March 21, 2019.

Inspection Activities - Underground Cables (IP Section 02.02c.) (1 Sample)

The inspectors evaluated cable submergence protection in Unit 3 Bravo diesel fuel oil vault on March 1, 2019.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

The inspectors observed and evaluated Unit 3 control room operators during a maintenance activity to replace power switch assemblies for control element assembly 22 on February 12, 2019.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

The inspectors observed and evaluated a licensed operator continuing training simulator scenario on February 5, 2019. The inspectors assessed the performance of the operators and the control room simulator.

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness Inspection (IP Section 02.01) (2 Samples)

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) Unit 1 chemical and volume control system charging pump discharge pressure relief valve failures, on January 24, 2019
(2) Unit 3 essential chilled water temperature control valve ECB-TV0030, on March 21, 2019

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Unit 2 elevated risk during station blackout generator and high pressure safety injection pump A maintenance, on January 8, 2019
(2) Unit 1 emergent work for main feedwater pump B mini-flow valve failure, on February 20, 2019
(3) Unit 3 online risk during diesel generator A super outage, on March 5, 2019

71111.15 - Operability Determinations and Functionality Assessments

Sample Selection (IP Section 02.01) (6 Samples)

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Unit 3 spent fuel pool decrease in Boron-10 concentration, on January 25, 2019
(2) Unit 3 control room essential air handing unit B temperature control valve response to handheld radio interference, on February 14, 2019
(3) Units 1, 2, and 3 analysis of manual compensatory actions to maintain high pressure safety injection operability and availability during reactor water tank full flow recirculation evolutions, on February 20, 2019
(4) Unit 2 reactor coolant pump vibration monitoring system, on February 22, 2019
(5) Unit 2 operability of shutdown cooling loop 1 isolation valve SI-653, on March 21, 2019
(6) Unit 3 pressurizer level control system tuning issues, on March 26, 2019

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples)

The inspectors evaluated the following temporary or permanent modifications:

(1) Unit 1 diesel generator A crankcase breather ventilation piping modification DG-1153, on February 28, 2019
(2) Station blackout generator 1 and 2 modification for permanently adjusting lube oil high pressure alarm set point, on March 20, 2019

71111.19 - Post Maintenance Testing

Post Maintenance Test Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the following post maintenance tests:

(1) Unit 3 control element assembly power switch assembly test following replacement, on February 12, 2019
(2) Unit 3 diesel generator B fuel oil transfer pump test following terminal board replacement, on February 21, 2019
(3) Unit 3 diesel generator A fast start following a diesel super outage, on March 8, 2019
(4) Unit 3 safety injection valve 615 test following periodic maintenance, on March 19, 2019

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

In Service Testing (IST) (IP Section 03.01)

77ST-9EW01, Unit 1 essential cooling water A inservice pump test, on January 31, 2019

Surveillance Testing (IP Section 03.01) (3 Samples)

(1) Unit 3 diesel generator A 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> surveillance and hot restart, on January 7, 2019

(2)77ST-9SB19, Unit 1 core protection calculator system channel C functional test, on January 8, 2019

(3)36ST-9SA02, Unit 1 engineered safety features actuation system train B subgroup relay functional testing, on February 21, 2019

71114.06 - Drill Evaluation

Drill and/or Simulator-Based Licensed Operator Requalification Training (IP Section 02.01)

(see 71114.06 for sample guidance)

The inspectors evaluated a dress rehearsal drill that required emergency facilities to respond to a fire in a diesel generator room, a steam generator tube rupture, and a steam line break on February 5, 2019.

71114.08 - Exercise Evaluation Scenario Review

Inspection Review (IP Section 02.01 - 02.04) (1 Sample)

The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on February 11, 2019. This review did not constitute approval of the scenario.

RADIATION SAFETY

71124.05 - Radiation Monitoring Instrumentation

Calibration and Testing Program (IP Section 02.02) (1 Sample)

The inspectors evaluated the calibration and testing program implementation.

Alarm set point and calibration method check of personnel contamination monitors, portal monitors and small article monitors:

  • iPCM-12
  • SAM-12 Failure to meet calibration or source check acceptance criteria:
  • SAC-4
  • PNR-4
  • MGTM

Walk Downs and Observations (IP Section 02.01) (1 Sample)

The inspectors evaluated radiation monitoring instrumentation during plant walkdowns. The inspector observed the following:

Portable survey instruments:

  • BC-4
  • SAC-4
  • RM-20 (multiple)
  • FH40GL
  • CM-11

Source check demonstration:

  • RM-20
  • FH40GL
  • SAM-12

Area radiation monitors and continuous air monitors:

  • RU-1
  • RU-2
  • RU-3
  • RU-8
  • RU-12
  • RU-15
  • RU-16
  • RU-33
  • RU-34
  • RU-37
  • RU-140
  • RU-142A-D
  • RU-149
  • RU-152A
  • RU-155D
  • RU-158D

Personnel contamination monitors, portal monitors and small article monitors:

  • iPCM-12
  • PCM-12
  • SAM-12

71124.06 - Radioactive Gaseous and Liquid Effluent Treatment

Calibration and Testing Program (Process & Effluent Monitors) (IP Section 02.02) (1 Sample)

The inspectors reviewed the following gaseous and liquid effluent monitor instrument calibrations and tests:

  • RU-12, Unit 1 Waste Gas Decay Tank Monitor Calibration
  • RU-144, Unit 1 Plant Vent Monitor High Calibration
  • RU-143, Unit 2 Plant Vent Monitor Low Calibration
  • RU-145, Unit 2 Fuel Building B Vent Exhaust Monitor Low Calibration
  • RU-143, Unit 3 Plant Vent Monitor Low Calibration
  • RU-146, Unit 3 Fuel Building B Vent Exhaust Monitor High Calibration

Dose Calculations (IP Section 02.05) (1 Sample):

The inspectors reviewed the following liquid and gaseous discharge permits to evaluate public dose calculations:

  • Permit 20172058, Unit 2 Refueling Purge
  • Permit 20182030, Unit 2 Plant Vent
  • Permit 20182103, Unit 2 Fuel Building Vent
  • Permit 20181142, Unit 1 Plant Vent
  • Permit 20181145, Unit 1 Fuel Building Vent
  • Permit 20191015, Unit 1 Fuel Building Vent
  • Permit 20192013, Unit 2 Plant Vent
  • Permit 20192015, Unit 2 Fuel Building Vent

The inspectors also reviewed the following annual radiological effluent release reports:

Abnormal gaseous or liquid tank discharges:

  • CR-2018-14265, Oily Waste Separator Tank Overflow

Instrumentation and Equipment (IP Section 02.04) (1 Sample)

The inspectors reviewed the following radioactive effluent discharge system surveillance test results:

  • STWO 4777407, Unit 1 Containment Building Purge Air Filtration Unit
  • STWO 4813386, Unit 2 Fuel and Aux Building Essential Air Filtration Unit
  • STWO 4836778, Unit 1 Fuel and Aux Building Essential Air Filtration Unit
  • STWO 4866355, Unit 3 Fuel and Aux Building Essential Air Filtration Unit

Sampling and Analysis (IP Section 02.03) (1 Sample)

The inspectors reviewed the following radioactive effluent sampling and analysis activities:

  • RU-145, Unit 3 Fuel Building Radiation Monitor Filter Change out and Gas Grab Sample
  • RU-143, Unit 2 Plant Ventilation Radiation Monitor Filter Change out and Gas Grab Sample
  • Unit 2 Primary to Secondary Sampling

Effluent discharges:

  • Unit 3 Fuel Building Vent Gas Effluent Discharge Permit
  • Unit 2 Plant Vent Gas Effluent Discharge Permit

Walk Downs and Observations (IP Section 02.01) (1 Sample)

The inspectors walked down the following gaseous and liquid radioactive effluent monitoring and filtered ventilation systems to assess the material condition and verify proper alignment according to plant design:

  • Unit 2 Plant Vent Radiation Monitoring System
  • Unit 3 Plant Vent Radiation Monitoring System
  • Unit 3 Fuel Building Radiation Monitoring System
  • Unit 3 Fuel Building Ventilation Exhaust System

71124.07 - Radiological Environmental Monitoring Program

Groundwater Protection Initiative (GPI) Implementation (IP Section 02.02) (1 Sample)

The inspectors evaluated the licensee's groundwater monitoring program.

Site Inspection (IP Section 02.01) (1 Sample)

The inspectors evaluated the radiological environmental monitoring program implementation.

Walkdowns and calibration and maintenance record review:

  • Air Sampling Station Site 4

The inspectors observed the following environmental sample collections and preparation:

  • Sites 4, 6A, 7A, 14A, 15, 17A, 21, 29, 35, and 40
  • Goat milk Licensee actions in response to missed sample, inoperable sampler, lost thermoluminescent detector (TLD) or anomalous measurement:
  • Air Sample Site 6A
  • Milk Sample Site 53

Sampling program for the potential of licensed material entering groundwater

  • Reactor Water Makeup Tank
  • Reactor Water Tank
  • Holdup Tank
  • Essential Pipe Density Tunnel

71124.08 - Radioactive Solid Waste Processing and Radioactive Material Handling, Storage,

and Transportation

Radioactive Material Storage (IP Section 02.01)

The inspectors evaluated radioactive material storage in the follow areas:

  • Dry Active Waste Processing and Storage (DAWPS) Facility
  • Low Level Radioactive Materials Storage Facility (LLRWSF)

Container check (e.g., swelling, leakage and deformation):

  • 14-210H Shipping Cask
  • 17-1-044 55 gallon drum of In Core Instruments (ICI's)
  • 17-1-045 55 gallon drum of ICIs
  • 17-1-046 55 gallon drum of ICIs
  • 18-3-097 Sealand Dry Active Waste (DAW)
  • 19-2-004 Sealand DAW
  • 19-2-007 Intermodal Asphalt
  • 19-2-008 Intermodal Asphalt
  • 19-3-006 Sealand DAW

Radioactive Waste System Walkdown (IP Section 02.02) (1 Sample)

The inspectors evaluated the following radioactive waste processing systems and processes during plant walkdowns.

Liquid or solid radioactive waste processing systems:

  • Dry Active Waste Processing and Storage (DAWPS) Facility
  • Low Level Radioactive Materials Storage Facility (LLRWSF)

Radioactive waste resin and/or sludge discharges processes:

  • High Integrity Container Receipt, Handling, Use, and Closure
  • Self-Engaging Rapid Dewatering Systems (SERDS) Operation

Shipment Preparation (IP Section 02.04) (1 Sample)

The inspectors were not able to evaluate and observe radioactive material shipment preparation processes as no shipments were in process. However, the inspectors reviewed several shipment packages that included surveys, pictures, and assessments in preparation for shipment.

Shipping Records (IP Section 02.05) (1 Sample)

The inspectors evaluated the following non-excepted package shipment records:

  • 17-SH-036
  • 17-SH-068
  • 18-RW-026
  • 18-RW-028
  • 18-RW-034
  • 18-SH-018
  • 18-SH-062

Waste Characterization and Classification (IP Section 02.03) (1 Sample)

The inspectors evaluated the radioactive waste characterization and classification for the following waste streams:

  • Dry Active Waste streams for Unit 1 (Sample ID: 1-17-042),

Unit 2 (Sample ID: 2-17-014), and Unit 3 (Sample ID: 3-18-040)

  • Filter analysis associated with shipping packages 18-RW-026 and 18-RW-028
  • Unit 2 waste oil analysis (Sample ID: 2-18-037)
  • Resin analysis associated with shipping package 18-SH-062

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===

Units 1, 2, and 3, January 1, 2018-December 31, 2018

IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (3 Samples)

Units 1, 2, and 3, January 1, 2018-December 31, 2018 IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (3 Samples)

Units 1, 2, and 3, January 1, 2018-December 31, 2018

MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) (3 Samples)

Units 1, 2, and 3, January 1, 2018-December 31, 2018

Drill/Exercise Performance (IP Section 02.12) (1 Sample)

The inspector reviewed data for the Drill/Exercise Performance indicator for the period January 1, 2018, through December 31, 2018.

ERO Drill Participation (IP Section 02.13) (1 Sample)

The inspector reviewed data for the ERO Participation Performance indicator for the period January 1, 2018, through December 31, 2018.

Alert & Notification System Reliability (IP Section 02.14) (1 Sample)

The inspector reviewed data for the Alert and Notification Performance indicator for the period January 1, 2018, through December 31, 2018.

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Units 1 and 3 control element drive mechanism control system power switch assembly failures
(2) Unit 1 balance of plant engineered safety features actuation system train A troubleshooting, and replacement of the train A engineered safety features load sequencer module

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

60854 - Preoperational Testing of an Independent Spent Fuel Storage Inspection (ISFSI)

An ISFSI inspection was conducted at PVNGS on March 19-21, 2019, by inspectors from Region I, Division of Nuclear Materials Safety. The PVNGS ISFSI was licensed as a general 10 CFR Part 72 licensee. The licensee had been utilizing the NAC, Universal Multi-Purpose Canister system (UMS), approved under Certificate of Compliance (CoC) 72-1015, Amendment 5, and NAC UMS Final Safety Analysis Report (FSAR), Revision 11, to load and store spent fuel at their ISFSI. At the time of the on-site inspection, PVNGSs ISFSI pad contained 152 NAC ventilated concrete casks (VCCs), each containing the steel Transportable Storage Container (TSC) with a capacity for 24 pressurized water reactor (PWR) spent fuel assemblies. The last routine ISFSI inspection was performed in March 2017 (ADAMS Accession No. ML17130B002).

Under the provisions of 10 CFR 72.210 and 10 CFR 72.212, PVGNS has decided to adopt and utilize a different storage system to store spent fuel casks at their ISFSI. The licensee has elected to utilize the NAC, Magnastor System under CoC 72-1031, Amendment 7, and FSAR Revision 10. The Magnastor TSC has the capacity to store 37 PWR spent fuel assemblies in each VCC.

The purpose of the inspection was to observe and evaluate the licensees pre-operational testing and training exercises required to be performed by a general licensee prior to use of the system to load spent fuel assemblies. The NAC Magnastor CoC 72-1031, Appendix A, Technical Specification (TS) 5.8 contains a list of loading, closure, handling, unloading, and transfer operations that are required to be performed. During the inspection the NRC inspectors observed PVNGS perform the following demonstrations from TS 5.8 (c): closing and sealing of the TSC to demonstrate welding; weld inspection and documentation; and leak testing. PVNGS still has a number of demonstrations that are required to be completed before the licensee can utilize the Magnastor system. Those demonstrations are projected to be performed in the summer of 2019.

The ISFSI activities specifically reviewed during the on-site inspection:

(1) Evaluated and observed dry run operations which included welding, weld inspection and documentation, and leak testing in accordance with TS 5.8 (c).
(2) Reviewed welder qualification program, welder performance qualifications, welding procedure specifications, and welding procedure qualification records.
(3) Reviewed NDE program procedure, NDE personnel certification records, the qualification program for visual test and liquid penetrant exams, liquid penetrant procedure, visual testing procedure, and helium leak testing procedure.
(4) Review Certified Material Test reports for liquid penetrant chemicals and welder filler metals.
(5) Evaluated and observed licensees radiation protection implementation during the dry run observations.
(6) Evaluated and observed licensees implementation of foreign material exclusion program during welding demonstrations.

The inspectors did not identify any issues of concern requiring documentation.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

On February 8, 2019, the inspector presented the baseline radiation safety inspection results to Mr. J. Cadogan, Senior Vice President of Site Operations, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.

On March 21, 2019, the inspectors presented the results from the ISFSI pre-operational welding demonstration inspection to Ms. Maria Lacal, Senior Vice President of Regulatory Oversight, and other members of the licensee staff. Licensee personnel acknowledged the information presented. The inspectors confirmed that proprietary information was controlled to protect from public disclosure.

On April 12, 2019, the inspector presented the quarterly resident inspector inspection results to Mr. Jack Cadogan, Senior Vice President, Site Operations, and other members of the licensee staff. The inspectors confirmed that proprietary information was controlled to protect from public disclosure.

DOCUMENTS REVIEWED

71111.01Adverse Weather Protection

Procedures

Number

Title

Revision

40OP-9ZZ19

Hot Weather Protection

40OP-9HS01

Site Building HVAC

Calculations

Number

Title

Revision

13-MC-SP-0307

SP/EW System Thermal Performance Design Bases

Analysis

71111.04Equipment Alignment

Condition Reports

17-02911

Work Orders

2711244

2781196

Procedures

Number

Title

Revision

40OP-9DG01

Emergency Diesel Generator A

40ST-9SI13

Train A LPSI and CS System Alignment Verification

Drawings

Number

Title

Revision

13-M-DGP-0001

P & I Diagram Diesel Generator System

71111.05AQFire Protection Annual/Quarterly

Miscellaneous Documents

Revision

or Date

Number

Title

PVNGS Updated FSAR

PVGS Pre-Fire Strategies Manual

13-MC-ZA-0808

MSSS Flooding At Elevation 81

Fire Protection Database Detailed Report

05/09/1998

PVNGS Safety Evaluation Report

71111.06Flood Protection Measures

Condition Reports

19-02890

19-02658

19-02418

19-02625

Procedures

Number

Title

Revision

40DP-9OPA3

Auxiliary Building Station Rounds

40AL-9RK2B

Panel B02B Alarm Response

40OP-9RD01

Radwaste Facility Sumps and Drains

Drawings

Number

Title

Revision

01-M-RDP-002

Radioactive Waste Drain System

2-M-RDP-002

Radioactive Waste Drain System

03-M-RDP-002

Radioactive Waste Drain System

Miscellaneous Documents

Revision

or Date

Number

Title

PVNGS Updated FSAR

Pre-Fire Strategies Manual

13-MC-ZA-0808

MSSS Flooding at Elevation 81

PO EDC-2019-

00144

Revise Calculation 13-MC-ZA-0808

03/01/2019

71111.11Licensed Operator Requalification Program and Licensed Operator Performance

Procedures

Number

Title

Revision

40DP-9OP02

Conduct of Operations

01DP-0AP57

Management of Critical Evolutions and Infrequently

Performed Test or Evolutions

Miscellaneous Documents

Date

Number

Title

Licensed Operator Continuing Training Simulator

Evaluation Scenario

2/05/2019

71111.12Maintenance Effectiveness

Condition Reports

18-16615

18-02240

18-01811

19-02330

19-02133

18-10880

18-10879

19-02364

Work Orders

4441828

4441462

Miscellaneous Documents

Number

Title

Date

19-02330-006

Engineering Evaluation

2/21/2019

Palo Verde Maintenance Rule Database

71111.13Maintenance Risk Assessments and Emergent Work Control

Condition Reports

16-15545

Procedures

Number

Title

Revision

40DP-9RS01

Operations Department Online Nuclear Risk

Management in Modes 1 and 2

70DP-0RA05

Assessment and Management of Risk When Performing

Maintenance

40DP-9AP21

Protected Equipment

Miscellaneous Documents

Number

Title

Date

EOOS 4.1

Schedulers Evaluation for Palo Verde Unit 1

2/21/2019 09:41

EOOS 4.1

Schedulers Evaluation for Palo Verde Unit 3

03/05/2019

71111.15Operability Determinations and Functionality Assessments

Condition Reports

18-16665

17-04204

18-18476

19-02567

19-02330

19-01290

18-17794

19-01962

19-01941

14-00853

19-04380

19-04382

Work Orders

5071741

Procedures

Number

Title

Revision

40DP-9OP26

Operations Condition Reporting Process and Operability

Determination / Functionality Assessment

73DP-0EE05

Engineering Preventive Maintenance Program

Procedures

Number

Title

Revision

40OP-9SV01

Loose Parts and Vibration Monitoring

73TI-9ZZ35

Ultrasonic Examination of Reactor Coolant Pump Shafts 7

31MT-9RC23

Reactor Coolant Pump Sulzer Bingham Seal

Replacement

40TI-9SF01

Pressurizer Level Control System Tuning

Miscellaneous Documents

Revision

or Date

Number

Title

18-17794-004

Level 2 Cause Analysis Report

TR-100491

EPRI: UPS Maintenance and Application Guide

Design Basis Manual: Safety Injection System

CRAI 3245187

Evaluation of the Class-1E and PK Inverters and

Associated Subcomponents

CRDR 3300933

Year SCR Replacement for PN and PK Inverters

RCTSAI 4524360

RCP Vibration Monitoring

04/17/2014

RCTSAI 4524358

RCP Shaft Ultrasonic Inspection Following Seal

Replacement

04/17/2014

RCTS 4524352

RCP Vibration Monitoring and Shaft UT Inspections

04/18/2014

PVAR 4524366

Actions for License Amendments 84, 72, and 56

04/17/2014

71111.18Plant Modifications

Condition Reports

16-19472

19-02927

14-00965

18-04376

Work Orders

3094267

4805058

Miscellaneous Documents

Number

Title

Revision

S-19-0005

CFR 50.59 Screening/Evaluation

18-04376-004

Design Equivalent Change Package: TMOD SBOG#!

Lube Oil High Pressure Alarm Set point Schedule

Adjustment

71111.19Post Maintenance Testing

Condition Reports

16-03732

19-03482

19-04033

Work Orders

5103635

4945749

4498502

4507037

4752532

5055992

5076980

4960255

5085998

Procedures

Number

Title

Revision

40OP-9DG01

Emergency Diesel Generator A

40OP-9DF01

Diesel Fuel Oil Storage and Transfer

73ST-9DF01

Diesel Fuel Oil Transfer Pumps - Inservice Test

40OP-9SF01

Control Element Drive Mechanism Control System

(CEDMCS) Operation

71111.22Surveillance Testing

Work Orders

4802907

4936283

4937964

4940893

Procedures

Number

Title

Revision

36ST-9SA02

ESFAS Train B Subgroup Relay Functional Test

40ST-9DG01

Diesel Generator A Test

73ST-9DG07

Class 1E Diesel Generator Load Rejection 24 Hour

Rated Load And Hot Start Test Train A

77ST-9SB19

CPCS Channel C Functional Test

73ST-9EW01

Essential Cooling Water Pumps - Inservice Test

71114.06Drill Evaluation

Miscellaneous Documents

Number

Title

Date

1901

Dress Rehearsal Controller Guide

TSC - Position Log

2/05/2019

Significant Events Log

2/05/2019

Form EP-0541

Palo Verde NAN Emergency Message Form

71124.05Radiation Monitoring Instrumentation

Procedures

Number

Title

Revision

74DP-9CY08

Radiological Monitoring Program

Procedures

Number

Title

Revision

74ST-9SQ23

Radiation Monitoring Calibration Test for New Scope Area

Monitors

74ST-9SQ33

Radiation Monitoring Calibration Test for Main Steam Line

Monitors

75RP-9EQ04

Calibration of the Eberline PNR-4 Neutron Dose Rate

Instrument

75RP-9EQ13

Canberra Whole Body Counting System Calibration

75RP-9EQ31

Calibration, Response Check and Operation of the SAM-12

Small Article Monitor

75RP-9EQ47

Calibration of the Eberline Model HP Series Frisker Probes

75RP-9EQ66

Calibration of the Thermo Scientific Model RO-20

Ion Chamber Survey Meter

75RP-9ME05

Scaler Counting Systems Performance Checks

Audits and Self-Assessments

Number

Title

Date

2Q 2017

Integrated Performance Assessment Report:

Radiation Protection Department

09/14/2017

2018-001

Audit Plan and Report: Chemistry

04/06/2018

218-04312

2017 Annual Radiation Protection Program Summary Report

07/11/2018

2018-007

Audit Plan and Report: Radiation Safety

2/14/2018

Condition Reports

17-01400

17-02247

17-08311

17-11014

17-13020

17-13492

17-15582

17-17353

18-02590

18-09583

Portable Instrumentation Calibration Data Sheet

Number

Title

Date

4380

PNR-4/NRD-1 Calibration Data Sheet

07/10/2018

8143

RO-20 Meter Data Sheet

09/07/2018

2708085

DRM 1/2 Calibration Data Sheet

10/01/2018

2914/12818 AMS-4 Calibration Data Sheet

10/09/2018

RAS-1 Air Sampler Calibration Data Sheet

10/19/2018

1182

RM-20 Count Rate Meter Data Sheet

01/04/2019

2927

FH 40 GL Internal Detector Calibration Data Sheet

01/15/2019

Portable Instrumentation Calibration Data Sheet

Number

Title

Date

11499

FHZ 612 Teleprobe Detector Calibration Data Sheet

01/24/2019

Stationary Radiation Instrument Calibration Records

Number

Title

Date

668

Small Article Monitor Calibration Data Sheet

09/18/2018

FastScan2

Calibration Verification Data Sheet

01/16/2019

364

BC-4 Instrument Calibration Data Sheet

01/22/2019

2983

3030P Calibration Data Sheet

01/23/2019

24

CM-11 Calibration Data Sheet

01/24/2019

213

PM-12 Calibration Cover Sheet

01/31/2019

2020

iPCM-12 Calibration Cover Sheet

2/05/2019

Calibration Source Records

Number

Title

Date

N997-0358

Kaman Report of Calibration Model KDA-HR High Range

Area Monitor Ion Chamber Detector

01/23/1980

8143

Shepherd Model 89 Verification Sheet

10/14/2018

940521

CDM-21 Calibrator Verification Report

10/24/2018

Work Order Records

Number

Title

Date

4980211

74ST9SQ343 Radiation Monitoring Calibration Test for

Waste Gas Decay Tank RMC Monitor (Unit 3) RU-12

03/08/2018

4867547

74ST9SQ333 Radiation Monitoring Calibration Test for Main

Steam Line Monitors. (Unit 3) (RU-139/140)

04/23/2018

4889856

"B" CTMT Build Refueling Purge Exhaust Monitor (Unit 1

RU-34)

07/25/2018

4898443

Personnel IARM A-Side (Unit 1 RU-155D)

08/28/2018

4948127

"A" Essential Cooling Water Radiation Monitor (Unit 3 RU-02) 09/13/2018

4911530

74ST9SQ232 Radiation Monitoring Calibration Test for

Baseline Area Monitors (Unit 2 RU-148-151)

10/23/2018

Miscellaneous Documents

Number

Title

Date

LS-6500 (U1, U2, & U3)

QC: Observed Source Response - dpm

2018

U1 MCA Detectors 1, 2, & 3 QC: 88 and 1332 keV Activity and 1332 keV FWHM

2018

Miscellaneous Documents

Number

Title

Date

U2 MCA Detectors 1, 2, & 3 QC: 88 and 1332 keV Activity and 1332 keV FWHM

2018

U3 MCA Detectors 1, 2, & 3 QC: 88 and 1332 keV Activity and 1332 keV FWHM

2018

237-03041-CAS

2nd Quarter 2018 Chemistry Hot Cross Checks

07/27/2018

237-03046-CAS

4th Quarter 2018 Chemistry Hot Cross Checks

01/22/2019

71124.06Radioactive Gaseous and Liquid Effluent Treatment

Procedures

Number

Title

Revision

74AL-9SQ01

Radiation Monitoring Systems Alarm Validation and Response 001

74RM-9EF20

Gaseous Radioactive Release Permits and Offsite Dose

Assessment

018

74RM-9EF23

Secondary System Liquid Discharge

016

74RM-9EF40

Radiation Monitoring System Operations

2

74RM-9EF41

Radiation Monitoring System Alarm Response

23

74RM-9EF42

Radiation Monitor Alarm Setpoint Determination

033

74RM-9EF43

Actions for Non-Functional Radiation Monitors: Preplanned

Alternate Sampling Program

017

74RM-9EF60

RMS Sample Collection

2

74RM-9EF63

RU-143 Sample Operations

001

74RM-9EF65

RU-145 Sample Operations

000

74RM-9EF80

RMS/Effluent Action Documentation

006

75RM-9EF01

Determination of Primary-to-Secondary Leak Rate

000

Audits and Self-Assessments

Number

Title

Date

17-11047-003

Radiological Monitoring Program

09/07/2017

2018-001

Nuclear Assurance Department (NAD): Chemistry

04/06/2018

2018-04312

2017 Annual Radiation Protection Program Summary

Report

07/11/2018

2018-007

Nuclear Assurance Department (NAD): Radiation Safety

2/14/2018

Condition Reports

16-02244

17-0299

17-01573

17-01926

17-05289

17-07961

17-11047

17-11559

17-13603

17-17884

18-02621

18-04140

18-04530

18-06915

18-08466

18-09004

18-11148

18-12193

18-13299

18-14265

18-14342

18-17591

19-00212

19-01531

Effluent Monitor Calibration Records

Number

Title

Date

STWO 04715454

RU-145 Unit 2 Fuel Building B Vent Exhaust Monitor Low

2/22/2017

STWO 04736183

RU-143 Unit 3 Plant Vent Monitor Low

04/22/2017

STWO 04760261

RU-146 Unit 3 Fuel Building B Vent Exhaust Monitor High

Calibration

05/10/2017

STWO 04863095

RU-144 Unit 1 Plant Vent Monitor High

09/15/2017

STWO 04980503

RU-12 Unit 1 Waste Gas Decay Tank Monitor

03/19/2018

STWO 04904815

RU-143 Unit 2 Plant Vent Monitor Low

09/20/2018

Air Cleaning System Surveillance Test Records

Number

Title

Date

STWO 4777407 Unit 1 Containment Building Purge Air Filtration Unit

09/06/2017

STWO 4813386 Unit 2 Fuel and Aux Building Essential Air Filtration Unit

2/21/2017

STWO 4836778 Unit 1 Fuel and Aux Building Essential Air Filtration Unit

2/09/2018

STWO 4866355 Unit 3 Fuel and Aux Building Essential Air Filtration Unit

05/29/2018

Gaseous Discharge Permits

Number

Title

Date

20172058

Unit 2 Refueling Purge

05/02/2017

20182030

Unit 2 Plant Vent

03/15/2018

20182103

Unit 2 Fuel Building Vent

09/11/2018

20181142

Unit 1 Plant Vent

11/08/2018

20181145

Unit 1 Fuel Building Vent

11/20/2018

20191015

Unit 1 Fuel Building Vent

01/29/2019

20192013

Unit 2 Plant Vent

01/31/2019

20192015

Unit 2 Fuel Building Vent

2/05/2019

Counting Detector Calibrations

Number

Title

Date

GMAR4L

HpGE Geometry - Unit 3 4500 cc gas Marinelli beaker

01/14/2016

PFIL1

HpGE Geometry - Unit 1 Particulate filer on shelf 1

07/20/2016

CCART1

HpGE Geometry - Unit 1 F&J cartridge on shelf 1

07/22/2016

CP1001

HpGE Geometry - Unit 2 CP100 charcoal face down shelf 1

11/21/2017

GMAR1L

HpGE Geometry - Unit 1 Gas 1L Marinelli beaker on detector face

2/08/2017

GVIAL1

HpGE Geometry - Unit 2 9.2 cc gas vial shelf 1

2/14/2017

Miscellaneous Documents

Number

Title

Date

Palo Verde Generating Station Daily Status Report

2/5-8/2019

Miscellaneous Documents

Number

Title

Date

Offsite Dose Calculation Manual (ODCM) Palo Verde

Nuclear Generating Station Units 1, 2, and 3

03/24/2016

RCTSAI 1566

2016 Annual Radioactive Effluent Release Report

04/15/2017

2-17-014

Waste Stream Report: Unit 2 Dry Active Waste

04//18/2017

1-17-042

Waste Stream Report: Unit 1 Dry Active Waste

10/28/2017

3-18-040

Waste Stream Report: Unit 3 Dry Active Waste

04/15/2018

RCTSAI 1566

2017 Annual Radioactive Effluent Release Report

04/25/2018

71124.07Radiological Environmental Monitoring Program

Procedures

Number

Title

Revision

74RM-0EN02

Radiological Environmental Air Sampling

74RM-0EN03

Radiological Environmental Sampling

74RM-0EN05

Environmental TLD Exchange/Reporting

74RM-0EN07

Land Use Census

Audits and Self-Assessments

Number

Title

Date

Integrated Performance Assessment Report - Radiation

Protection Department Quarter #1

06/22/2017

Integrated Performance Assessment Report - Radiation

Protection Department Quarter #2

09/14/2017

Integrated Performance Assessment Report - Radiation

Protection Department Quarter #3

2/19/2017

Integrated Performance Assessment Report - Radiation

Protection Department Quarter #4

03/09/2018

218-04312

Annual Radiation Protection Program Summary Report

07/11/2018

Integrated Performance Assessment Report - Radiation

Protection 1st Half 2018

08/15/2018

SWMS

No. 15-04023-003

Groundwater Protection Initiative NEW 07-07

2/06/2018

2018-007

Nuclear Assurance Department (NAD) Audit Plan and

Report - Radiation Safety

2/14/2018

Condition Reports

17-00760

17-01085

17-01203

17-01859

17-03281

17-03798

17-04052

17-04054

17-04212

17-04747

17-06259

17-07102

17-07269

17-08535

17-10101

17-10463

17-10476

17-10693

17-15048

17-17823

Condition Reports

17-18260

18-00109

18-00633

18-01069

18-01383

18-01500

18-01583

18-03310

18-04530

18-06018

18-10111

18-10649

18-10739

18-11127

18-11210

18-12934

18-14265

18-15019

Groundwater Protection Documents

Revision

or Date

Number

Title

75DP-9AP01

Ground Water Protection Program

SWMS No.

15-04023-003

Groundwater Protection Initiative NEI 07-07

2/06/2018

Meteorological Calibration Records

Number

Title

Date

WO 4905809

Met System Redundant Cab

2/12/2017

WO 4905809

Met System Primary Cab A

11/06/2017

WO 4988254

Met System Calibration (Primary System)

10/10/2018

WO 4988280

Met System Calibration (Redundant System)

10/10/2018

Miscellaneous Documents

Number

Title

Date

2016

Annual Radiological Environmental Operating Report

04/14/2017

2017

Annual Radiological Environmental Operating Report

04/10/2018

71124.08Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,

and Transportation

Procedures

Number

Title

Revision

75RP-9RP15

Control and Storage of Radioactive Material and Radioactive

Wastes

76DP-0AP12

Low Level Radioactive Material Storage Facility Overview

76-DP-0RP01

Radioactive Waste Management Program Overview

76-DP-0RP03

Radwaste Process Control Program

76-RP-0RW03

Waste Stream Sampling and Database Maintenance

76-RP-0RW05

Packaging and Classification of Radioactive Waste

76-RP-0RW06

Packaging of Radioactive Material

76-RP-0RW07

Shipping Radioactive Materials

76-RP-0RW08

High Integrity Container Receipt, Handling, Use, and Closure 4

76-RP-0RW09

Transfer, Storage and Processing of Radioactive Filters

Procedures

Number

Title

Revision

76-RP-0RW10

Handling and Storage of Radioactively Contaminated

Chemical Waste and Mixed Waste

76-RP-0RW82

Self-Engaging Rapid Dewatering System (SERDS)

Operation

91-DP-0EN50-02

Waste Stream Characterization Administrative Guideline

Audits and Self-Assessments

Number

Title

Date

202

NUPIC Audit: WMG, Inc.

03/18/2016

24365

NUPIC Audit: Energy Solutions

2/04/2017

2017-002

NAD Audit: Procurement and Material Control

05/05/2017

2018-007

NAD Audit: Radiation Safety

2/14/2018

2-03734 January 2018 Offsite Safety Review Committee Meeting 18-001,

Operations, Chemistry and Radiation Protection Subcommittee

Report

01/26/2018

Shipping Packages

17-RW-004

17-SH-036

17-SH-055

17-SH-068

18-RW-009

18-RW-020

18-RW-022

18-RW-026

18-RW-028

18-RW-034

18-SH-018

18-SH-062

Condition Reports

17-02737

17-04797

17-12153

17-13693

17-17333

17-18114

18-00790

18-03801

18-07057

Surveys

Survey Number

Title

Date

0-M-20190110-1

DAWPS Processing Area Monthly Survey

01/10/2019

0-M-20190110-3

LLRMSF Monthly Survey

01/10/2019

0-M-20190102-2

DAWPS Monthly Yard Survey

01/10/2019

0-M-20190123-1

DAWPS Storage Area Monthly Routine Survey

01/23/2019

Sample Analyses

Type

Sample ID

Date

Unit 1 DAW

1-17-042

2/28/2018

Unit 2 DAW

2-17-014

2/28/2018

Unit 3 DAW

3-18-040

2/28/2018

Unit 2 Oil

2-18-037

09/01/2017

Miscellaneous Documents

Number

Title

Date

NBA11C000113 Radiation Protection Technician Training

Program: Packaging Radioactive Material

08/14/2018

NBA19C000109 Radiation Protection Technician Training

Program: Shipping Radioactive Material

07/31/2015

2016 Annual Radioactive Effluent Release Report

04/15/2017

2017 Annual Radioactive Effluent Release Report

04/15/2018

Employee Training Records: Shipping Radioactive

Material

03/31/2017 and

08/11/2017

Waste Control Specialist Generator Certification

Approval Letter

11/03/2017 and

09/07/2018

71151Performance Indicator Verification

Miscellaneous Documents

Number

Title

Revision

NEI 99-02

Regulatory Performance Indicator Document

71152Problem Identification and Resolution

Condition Reports

19-00802

18-18324

18-19112

18-15793

18-18212

19-02376

19-02956

19-03063

Work Orders

4481512

5101889

Procedures

Number

Title

Revision

36ST-9SA05

FBEVAS, CREFAS, and CRVIAS 18 month Functional

Test

40OP-9SA01

BOP ESFAS Modules Operation

40OP-9SA02

De-Energization of BOP ESFAS

40AL-9RK5A

Panel B05A Alarm Response

40DP-9OP06

Operations Department Repetitive Task Program

130

Drawings

Number

Title

Revision

01-E-SAB-004

Elementary Diagram ESF Actuation System BOP-

ESFAS Intertying Circuits Train A & Train B

Miscellaneous Documents

Number

Title

Revision

PVNGS Updated FSAR

4OA5Other Activities (IP 60854)

Condition Reports

19-04069

Procedures

Number

Title

Revision

GQP 9.0

PCI Training, Qualification, Examination, and

Certification of NDE Personnel

GQP 9.1

PCI Training, Qualification, Examination, and

Certification of Inspection and Testing Personnel

GQP 9.2

PCI High Temperature Liquid Penetrant Examination

and Acceptance Standards for Welds

GQP 9.7

PCI Liquid Penetrant Examination and Acceptance

Standards for Welds (40 - 125 degrees F)

GQP 9.6

PCI Visual Examination of Welds

75DC-9SF02

Radiation Protection for Magnastor

PI-CNSTR-OP-PV-

NMS-01

Closure Welding of Magnastor Canisters for PV

30DP-9MP23

Foreign Material Exclusion Controls

MSLT-PCI-PV

Helium Mass Spectrometer Leak Test Procedure

4108-0

Design Basis Documents

Number

Title

Revision

ISFSI FSAR

NAC Magnastor Final Safety Analysis Report

CoC 1031

CoC and Technical Specifications for Magnastor

System

Amendment 7

Miscellaneous Documents

Revision

or Date

Number

Title

Q-16A

Leak Test Specialist NDE LT Level III Personnel

Certificate

09/19/2018

SAP #27044

PCI NDE VT/PT Level II Personnel Certificate

01/15/2019

CMTRs

Spotcheck Penetrant, SKL-SP2 Spotcheck Developer

SKD-S2, SKC-S, and Sherwin Certification for D-100, D-

350, KO-17, KO-19 Liquid Penetrant Materials

Various dates

Certificate of

Compliance

  1. 915501-02 Various Welding Shims and Wire

Various dates

Miscellaneous Documents

Revision

or Date

Number

Title

MC-GTAW

PCI Welding Procedure Specification Machine Gas

Tungsten Arc Welding

PQR-62

PCI Procedure Qualification Record for WPS 8

PQE-63

PCI Procedure Qualification Record for Manual GTAW

PQR-600

PCI Procedure Qualification Record for Machine GTAW

PQR-899

PCI Procedure Qualification Record for Machine 8

GTAW

The following items are requested for the

Public Radiation Safety Inspection

at Palo Verde

Dates of Inspection: 02/04/2019 to 02/08/2019

Integrated Report 2019001

Inspection areas are listed in the attachments below.

Please provide the requested information on or before Monday, January 21, 2019.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.05 should be in a file/folder titled

5-A, applicable organization charts in file/folder 5-B, etc.

The information should be provided in electronic format or a secure document management

service. If information is placed on a secured document management system, please ensure

the inspection exit date entered is at least 30 days later than the onsite inspection dates, so the

inspectors will have access to the information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Natasha Greene at 817-200-1154 or via

e-mail at Natasha.Greene@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

5.

Radiation Monitoring Instrumentation (71124.05)

Date of Last Inspection:

January 23, 2017

A.

List of contacts and telephone numbers for the following areas below. Please include

area code and prefix. If work cell numbers are appropriate, then please include them as

well.

1. Process monitor calibration (Include Chemistry, Systems Engineering and I&C, as

applicable)

2. Radiation protection instrument calibration (Portable and Stationary)

3. Installed instrument calibrations (Include Systems Engineering and I&C)

4. Count room and Laboratory instrument calibrations (Include RP and Chemistry, as

applicable)

5. EP contacts for Equipment Important to Emergency Response/Preparedness

(EITER)

6. Licensing/Regulatory Affairs

B.

Applicable organization charts, including position or job titles. Please include as

appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),

Engineering, and Emergency Protection. (Recent pictures are appreciated.)

C.

Copies of audits, self-assessments, vendor or NUPIC audits for contractor support,

LARs, and LERs, performed since the date of the last inspection, related to:

1. Portable Radiation instruments: Area radiation monitors, portable continuous air

monitors (AMS3/4), portable survey instruments (count rate, dose rate, occupational

air sampling), electronic dosimeters, teledosimetry

2. Stationary Radiation Instruments: Portal monitors, small article monitors, personnel

contamination monitors, or whole body counters

3. Installed Radiation Instruments: Area radiation monitors (RMS), process monitors

(non-effluent), criticality monitors, accident monitors

4. Count Room instrumentation (Chemistry and RP, if separate RP Ops and Effluents):

Gamma Spec, LSC, Gross Alpha, Gross Beta, including bench-top counters

D.

Procedure indexes for radiation protection procedures and other related disciplines.

1. Calibration, use, and operation of continuous air monitors, portable survey

instruments, temporary area radiation monitors, electronic dosimeters, teledosimetry

2. Calibration use and operation of portal monitors, small article monitors, personnel

contamination monitors, and whole body counters

3. Calibration of installed area radiation monitors, process monitors, criticality monitors,

and accident monitors

4. Calibration use and operation of Count Room instrumentation (GS, LSC, GA, GB)

(include bench top counters here)

NOTE: Please ensure that RP, Chemistry, and I&C procedures are included, as

appropriate.

E.

Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspector reviews the

procedure index.

1. Calibration of portable ion chambers

2. Calibration of Friskers

3. Calibration of telescoping high range instruments

4. Calibration of portable neutron instruments

5. Calibration of SAMs

6. Whole body counter calibration

7. Laboratory instrumentation quality control

8. Calibration of Containment/Drywell high range radiation monitor

F.

Please provide a list of NRC Regulatory Guides and NUREGs that you are currently

committed to relative to this program. Please include the revision and/or date for the

commitment and where this may be located in your current licensing basis documents.

G.

Please provide a summary list of corrective action documents (including corporate and

sub-tiered systems) written since the date of the last inspection, related to the following

programs:

1. Area radiation monitors, continuous air monitors, portable survey instruments,

electronic dosimeters, and teledosimetry

2. Portal monitors, small article monitors, personnel contamination monitors, and whole

body counters

3. Installed radiation monitors, criticality monitors, accident range monitors

4. Count room radiation instruments

NOTE: These lists should include a description of the condition that provides

sufficient detail that the inspectors can ascertain the regulatory impact, the

significance level assigned to the condition, the status of the action (e.g., open,

working, closed, etc.) and the search criteria used. Please provide in document

formats which are sortable and searchable so that inspectors can quickly and

efficiently determine appropriate sampling and perform word searches, as

needed. (Excel spreadsheets are the preferred format.) If codes are used,

please provide a legend for each column where a code is used.

H.

State the required calibration frequency and provide the most recent calibration data for

the whole body counters, at least one portable survey instrument, one area radiation

monitor, one air sampler, one continuous air monitor, and one drywell/containment high-

range monitor.

I.

Provide a list of any scheduled calibrations, while we are onsite, for the instrumentation

noted in request above, in 5-I.

J.

Provide the alarm set point values for the portal and personnel contamination monitors in

operation.

K.

Radiation Monitoring System health report for the previous 12 months

L.

Provide the following lists of instruments to include make, model, identifier (S/N or plant

ID), and location:

1. Portable radiation instruments currently in use (for EADs just make, model, and

quantity).

2. Stationary radiation instruments currently in use.

3. Installed Radiation monitors

a. Area radiation monitors and

b. Process radiation monitors.

(Include their instrumentation designator, function and calibration procedure

number and title.) Please indicate which, if any, detectors have been

replaced within the past 2 years (since the last inspection).

c. Radiation instrumentation abandoned in place.

d. Radiation instrumentation covered by the maintenance rule.

M.

Provide a list of sources used routinely for source check of portable, stationary, and

installed radiation monitoring instruments.

N.

Provide the NIST traceability and calibration or verification of the primary sources for

instrument calibration and the procedures used to achieve this.

6.

Radioactive Gaseous and Liquid Effluent Treatment (71124.06)

Date of Last Inspection:

January 23, 2017

A.

List of contacts and telephone numbers for the following areas. Please include area

code and prefix. If work cell numbers are appropriate, then please include them as well.

1. Radiological effluent control (liquid & gaseous) and reporting

(RP, Chemistry, RW, Ops, etc.)

2. Effluent Monitor calibration (liquid and gaseous) and maintenance

(RP, Chemistry, I&C, Maintenance, Systems Engineering, EP, etc.)

3. Engineered safety feature air cleaning systems for effluent release

(Systems Engineering, I&C, Maintenance, etc.)

4. Licensing/Regulatory Affairs

B.

Applicable organization charts including position or job titles for the above individuals

and also for their supportive Management. Please include as appropriate for your site,

Site Management, RP, Chemistry, Maintenance (I&C), Engineering, and Emergency

Protection. (Recent pictures are appreciated.)

C.

Copies of audits, self-assessments, vendor or NUPIC audits of contractor support, and

LERs written since the date of the last inspection, related to:

1. Radioactive effluents and effluent radiation monitors

2. Engineered Safety Feature Air cleaning systems

D.

Procedure indexes for the following areas and related disciplines.

1. Radioactive effluents and effluent radiation monitors (to include the flow monitors)

2. Engineered Safety Feature Air cleaning systems (both TS and non-TS systems for

effluents)

E.

Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspector reviews the

procedure indexes.

1. Sampling and analysis of radioactive effluents

2. Effluent monitor setpoint determination

3. Generating radioactive effluent release permits

4. Effluent Monitor Calibrations (Include associated flow monitors)

5. Laboratory instrumentation quality control

6. In-place testing of HEPA filters and charcoal adsorbers for TS effluent exhaust

systems and other effluent air-cleaning systems, but not breathing air systems

F.

Please provide a list of NRC Regulatory Guides and NUREGs that you are currently

committed to relative to this program. Please include the revision and/or date for the

commitment and where this may be located in your current licensing basis documents.

G.

Please provide a summary list of corrective action documents (including corporate and

sub-tiered systems) written since the date of the last inspection, associated with:

1. Radioactive effluents

2. Effluent radiation monitors (include associated effluent flow monitors)

3. Engineered Safety Feature Air cleaning systems (effluents, not breathing air)

NOTE: These lists should include a description of the condition that provides

sufficient detail that the inspectors can ascertain the regulatory impact, the

significance level assigned to the condition, the status of the action (e.g., open,

working, closed, etc.) and the search criteria used. Please provide in document

formats which are sortable and searchable so that inspectors can quickly and

efficiently determine appropriate sampling and perform word searches, as

needed. (Excel spreadsheets are the preferred format.) If codes are used,

please provide a legend for each column where a code is used.

H.

Annual Radioactive Effluent Release Reports for the latest two calendar years

I.

Current revision of the Offsite Dose Calculation Manual (or other name, but include all

parts for effluents) and any changes made since the last inspection.

J.

The inter-laboratory comparison results for laboratory quality control performance of

effluent sample analysis for the latest two calendar years

K.

Effluent sampling schedule for the week of the inspection

L.

Provide the last three annual trends of vent/stack effluent flow rates, by chart or table.

M.

Operations department (or other responsible dept.) log records for effluent monitors

removed from service or out of service or a list of the same and compensatory actions

taken during the out of service condition.

N.

Listing or log of liquid and gaseous release permits since the date of the last inspection

O.

A list of the technical specification-required air cleaning systems with the two most

recent surveillance test dates of in-place filter testing (of HEPA filters and charcoal

adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers

associated with the surveillances (and their system number/name).

P.

System Health Report for radiation monitoring instrumentation. Also, please provide a

specific list of all effluent radiation monitors that were considered inoperable for 7 days

or more since the date of the last inspection. If applicable, please provide the relative

Special Report and condition report(s). If not covered by maintenance rule, please

provide rationale.

Q.

A list of significant changes made to the gaseous and liquid effluent process monitoring

system since the date of the last inspection. If applicable, please provide the

corresponding UFSAR section in which this change was documented.

R.

A list of any occurrence in which a non-radioactive system was contaminated by a

radioactive system since the date of the last inspection. Please include any relevant

condition report(s).

S.

Current Part 61 analyses for hard to detect radionuclides

T.

Latest Land Use Census (coordinate with 71124.07)

U.

Effluent based procedures for EALs or EOPs.

7.

Radiological Environmental Monitoring Program (71124.07)

Date of Last Inspection:

January 23, 2017

A.

List of contacts and telephone numbers for the following areas. Please include area

code and prefix. If work cell numbers are appropriate, then please include them as well.

1. Radiological environmental monitoring (RP, Chemistry, I&C, etc.)

2. Meteorological monitoring (RP, Chemistry, EP, I&C, System Engineering, etc.)

3. Maintenance and calibration of the above equipment

4. Licensing/Regulatory Affairs

B.

Applicable organization charts including position or job titles. Please include as

appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),

Engineering, and Emergency Protection. (Recent pictures are appreciated.)

C.

Copies of audits, self-assessments, vendor or NUPIC audits of contractor support, and

LERs written since the date of the last inspection, related to:

1. Radiological environmental monitoring program (including contractor environmental

laboratory audits, if used to perform environmental program functions)

2. Environmental TLD processing facility

3. Meteorological monitoring program

D.

Procedure index for the following areas and other related disciplines.

1. Radiological environmental monitoring program

2. Meteorological monitoring program

3. Maintenance and calibration of related instrumentation, including the meteorological

tower

E.

Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspector reviews the

procedure indexes.

1. Sampling, collection and preparation of environmental samples

2. Sample analysis (if performed onsite)

3. Laboratory instrumentation quality control

4. Meteorological Tower sensor calibrations

F.

Please provide a list of NRC Regulatory Guides and NUREGs that you are currently

committed to relative to this program. Please include the revision and/or date for the

commitment and where this may be located in your current licensing basis documents.

G.

Please provide a summary list of corrective action documents (including corporate and

sub-tiered systems) written since the date of the last inspection, related to the following

programs:

1. Radiological environmental monitoring (include TLDs and air sample pumps or their

infrastructure)

2. Meteorological monitoring (include Met Tower sensors and support equipment)

These lists should include a description of the condition that provides sufficient

detail that the inspectors can ascertain the regulatory impact, the significance

level assigned to the condition, the status of the action (e.g., open, working,

closed, etc.) and the search criteria used. Please provide in document formats

which are sortable and searchable so that inspectors can quickly and

efficiently determine appropriate sampling and perform word searches, as

needed. (Excel spreadsheets are the preferred format.) If codes are used,

please provide a legend for each column where a code is used.

H.

Copies of the two most recent calibration packages for the meteorological tower

instruments

I.

Copies of the Annual Radiological Environmental Operating Reports and Land Use

Census for the latest two calendar years, and current revision of the Offsite Dose

Calculation Manual. Please include any supportive documentation for the changes

made to the ODCM since the last inspection.

J.

Copy of the environmental laboratorys inter-laboratory comparison program results for

the latest two calendar years, if not included in the Annual Radiological Environmental

Operating Report

K.

Data from the environmental laboratory documenting the analytical detection sensitivities

for the various environmental sample media (i.e., air, water, soil, vegetation, and milk)

L.

Quality Assurance audits (e.g., NUPIC) for contracted services

M.

Current NEI Groundwater Protection Initiative (GPI) Plan and status. Provide the most

recent monitoring results for each monitoring well per the GPI. Provide a separate list of

any missed samples, as applicable.

N.

Technical requirements manual or licensee controlled specifications which list the

meteorological instruments calibration requirements

O.

If applicable, per NEI 07-07, provide any reports that document any spills/leaks to

groundwater since the date of the last inspection. Please indicate what external

communications were made regarding each spill/leak.

P.

Provide any new entries into 10 CFR 50.75(g) files since the date of the last inspection.

Q.

Please identify your three highest X/Q (chi/Q) and/or D/Q sectors, as currently used in

the selection of your required REMP sampling locations. If these are different values

from your most recent meteorological assessment, please provide that assessment and

indicate the three highest X/Q and/or D/Q sectors per your latest assessment. Also

indicate your noted predominant and least prevalent wind direction/sector, as used in

your REMP analysis.

R.

Provide the height of the highest effluent release point. Please indicate if the height

accounts for plant grade elevation. Please also provide the most probable atmospheric

release height, if different from the highest effluent release point.

S.

Please provide a schedule of any planned REMP sampling activities while we, the NRC,

are scheduled to be onsite performing this inspection.

8.

Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,

and Transportation (71124.08)

Date of Last Inspection:

January 23, 2017

A.

List of contacts and telephone numbers for the following areas. Please include area

code and prefix. If work cell numbers are appropriate, then please include them as well.

1. Solid Radioactive waste processing (RP, Chemistry, Ops, Maintenance, I&C,

Engineering, etc.)

2. Transportation of radioactive material/waste (RP, Maintenance, Ops, Security,

Chemistry, etc.)

3. personnel involved in solid radwaste processing, transferring, and transportation of

radioactive waste/materials)

4. Licensing/Regulatory Affairs

B.

Applicable organization charts including position or job titles. Please include as

appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),

Engineering, and Emergency Protection. (Recent pictures are appreciated.)

C.

Copies of audits, department self-assessments, and LERs written since the date of the

last inspection, related to:

1. Solid radioactive waste management

2. Radioactive material/waste transportation program

D.

Procedure index for the following areas and other related disciplines.

1. Solid radioactive waste management

2. Radioactive material/waste transportation

E.

Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspector reviews the

procedure indexes.

1. Process control program and any changes made since the last inspection

2. Solid and liquid radioactive waste processing

3. Waste stream sampling and analysis

4. Waste characterization and classification

5. Radioactive material/waste packaging & shipping

F.

Please provide a list of NRC Regulatory Guides and NUREGs that you are currently

committed to relative to this program. Please include the revision and/or date for the

commitment and where this may be located in your current licensing basis documents.

G.

Please provide a summary list of corrective action documents (including corporate and

sub-tiered systems) written since the date of the last inspection, related to:

1. Solid radioactive waste

2. Transportation of radioactive material/waste

NOTE: These lists should include a description of the condition that provides

sufficient detail that the inspectors can ascertain the regulatory impact, the

significance level assigned to the condition, the status of the action (e.g., open,

working, closed, etc.) and the search criteria used. Please provide in document

formats which are sortable and searchable so that inspectors can quickly and

efficiently determine appropriate sampling and perform word searches, as

needed. (Excel spreadsheets are the preferred format.) If codes are used,

please provide a legend for each column where a code is used.

H.

Copies of training lesson plans for 49 CFR 172, Subpart H, for radwaste processing,

packaging, and shipping

I.

Provide a summary list or log of radioactive material and radioactive waste shipments for

the two most recent calendar years, in addition to the current calendar year.

J.

Please provide at least two different radioactive waste stream sample analysis results

and resulting scaling factors for the latest two calendar years.

K.

A listing of all onsite radwaste storage facilities. Please include a summary or list of the

items stored in each facility with the most recent dose rates/surveys.

L.

A list of any significant (e.g., DAW, resins, Type B or greater) radioactive shipments that

will be completed during our onsite inspection period. If available, please provide the

applicable shipping manifests/waste characterizations and most recent surveys for each

shipment.

M.

A list of significant changes made to the liquid or solid radwaste processing systems

since the date of the last inspection. If applicable, please provide the corresponding

UFSAR section in which this change was documented. Provide any supportive

documentation for the changes made or have it readily available for review.

N.

List of radioactive waste processing systems or equipment abandoned in place since the

last inspection.

O.

Please provide a schedule of radioactive material or waste processing or shipment

activities during the inspection week. Please indicate the current storage location of the

stored RAM or waste prepared for shipment, as well as any supportive surveys of its

measured dose rates. If available, please indicate its current stated waste class.

ML19122A295

SUNSI Review:

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: JDixon

Yes No

Publicly Available

Sensitive

OFFICE

DRP/SRI

DRP/RI

DRP/RI

DRP/RI

C:DRS/EB1

C:DRS/EB2

NAME

CPeabody

DReinert

DYou

RBywater

VGaddy

GPick

SIGNATURE

CAP

DRR

DDY

RLB

vgg

GAP

DATE

4/24/2019

4/29/2019

4/25/2019

4/24/2019

4/25/2019

4/25/2019

OFFICE

C:DRS/OB

C:DNMS/RIB

TL:IPAT

C:DRS/RCB

C:DRP/D

NAME

GWerner

GWarnick

RKellar

NMakris

NOKeefe

SIGNATURE

GEW

JFK for

RLK

NM

NFO

DATE

04/25/2019

4/30/2019

4/25/2019

4/25/2019

4/30/2019