ML091620074: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Duke                                                                           DAVE BAXTER Vice President Oconee Nuclear Station Duke Energy ON01 VP / 7800 Rochester Highway Seneca, SC 29672 864-873-4460 864-873-4208 fax dabaxter@dukeenergy.com June 8, 2009 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-0001
{{#Wiki_filter:Duke DAVE BAXTER Vice President Oconee Nuclear Station Duke Energy ON01 VP / 7800 Rochester Highway Seneca, SC 29672 864-873-4460 864-873-4208 fax dabaxter@dukeenergy.com June 8, 2009 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-0001


==Subject:==
==Subject:==
Line 24: Line 24:
If there are any questions regarding this letter, please contact Reene' V. Gambrell at (864) 873-3364.
If there are any questions regarding this letter, please contact Reene' V. Gambrell at (864) 873-3364.
Sincerely, DaeBaxter, Vice President Oconee Nuclear Station
Sincerely, DaeBaxter, Vice President Oconee Nuclear Station
                                                                                                      ,4ool www. duke-energy.com
,4ool www. duke-energy. com


Nuclear Regulatory Commission Adoption of TSTF-493 June 8,2009                                                                 Page 2 cc:
Nuclear Regulatory Commission Adoption of TSTF-493 June 8,2009 Page 2 cc:
Mr. Luis Reyes Regional Administer U.S. Nuclear Regulatory Commission - Region II Sam Nunn Atlanta Federal Center, 23 T85 61 Forsyth St., SW Atlanta, GA 30303-8931 Mr. John Stang Senior Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8 G9A 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. Andy Hutto NRC Senior Resident Inspector Oconee Nuclear Station Susan E. Jenkins, Manager, Infectious and Radioactive Waste Management, Bureau of Land and Waste Management Department of Health & Environmental Control 2600 Bull Street, Columbia, SC 2920}}
Mr. Luis Reyes Regional Administer U.S. Nuclear Regulatory Commission - Region II Sam Nunn Atlanta Federal Center, 23 T85 61 Forsyth St., SW Atlanta, GA 30303-8931 Mr. John Stang Senior Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8 G9A 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. Andy Hutto NRC Senior Resident Inspector Oconee Nuclear Station Susan E. Jenkins, Manager, Infectious and Radioactive Waste Management, Bureau of Land and Waste Management Department of Health & Environmental Control 2600 Bull Street, Columbia, SC 2920}}

Latest revision as of 11:26, 14 January 2025

24 Month Fuel Cycles and Adoption of TSTF-493
ML091620074
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/08/2009
From: Baxter D
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TSTF-493
Download: ML091620074 (2)


Text

Duke DAVE BAXTER Vice President Oconee Nuclear Station Duke Energy ON01 VP / 7800 Rochester Highway Seneca, SC 29672 864-873-4460 864-873-4208 fax dabaxter@dukeenergy.com June 8, 2009 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-0001

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2 and 3 Renewed Facility Operating Licenses Numbers DPR-38, -47 and -55; Docket Numbers 50-269, 50-270 and 50-287 24 Month Fuel Cycles and Adoption of TSTF-493 The purpose of this letter is to inform the Nuclear Regulatory Commission (NRC) that as Duke Energy Carolinas, LLC (Duke) transitions to a 24 month fuel cycle at the Oconee Nuclear Station (ONS), Duke is not planning to adopt TSTF-493, "Clarify Application of Setpoint Methodology for LSSS Functions" as part of the ONS Licensing Basis unless Technical Specification setpoint allowable values have to be changed. This information was discussed with Hukem Garg and Carl Schulton of the NRC staff on March 26, 2009.

If there are any questions regarding this letter, please contact Reene' V. Gambrell at (864) 873-3364.

Sincerely, DaeBaxter, Vice President Oconee Nuclear Station

,4ool www. duke-energy. com

Nuclear Regulatory Commission Adoption of TSTF-493 June 8,2009 Page 2 cc:

Mr. Luis Reyes Regional Administer U.S. Nuclear Regulatory Commission - Region II Sam Nunn Atlanta Federal Center, 23 T85 61 Forsyth St., SW Atlanta, GA 30303-8931 Mr. John Stang Senior Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8 G9A 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. Andy Hutto NRC Senior Resident Inspector Oconee Nuclear Station Susan E. Jenkins, Manager, Infectious and Radioactive Waste Management, Bureau of Land and Waste Management Department of Health & Environmental Control 2600 Bull Street, Columbia, SC 2920