ML100550630: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Decay Time TR 3.9.1 TR 3.9 REFUELING OPERATIONS TR 3.9.1 Decay Time TR 3.9.1 | {{#Wiki_filter:Decay Time TR 3.9.1 Watts Bar - Unit 2 3.9-1 Technical Requirements (developmental) | ||
APPLICABILITY: | A TR 3.9 REFUELING OPERATIONS TR 3.9.1 Decay Time TR 3.9.1 The reactor shall be subcritical for > 100 hours. | ||
ACTIONS CONDITION | APPLICABILITY: | ||
During movement of irradiated fuel in the reactor vessel. | |||
TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE | ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. | ||
Reactor subcritical for | |||
< 100 hours. | |||
A.1 Suspend all operations involving movement of irradiated fuel in the reactor vessel. | |||
Immediately TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.1.1 Verify the reactor has been subcritical for > 100 hours by confirming the date and time of subcriticality. | |||
Prior to movement of irradiated fuel in the reactor vessel | |||
Communications TR 3.9.2 TR 3.9 REFUELING OPERATIONS TR 3.9.2 Communications TR 3.9.2 | Communications TR 3.9.2 Watts Bar - Unit 2 3.9-2 Technical Requirements (developmental) | ||
APPLICABILITY: | A TR 3.9 REFUELING OPERATIONS TR 3.9.2 Communications TR 3.9.2 Direct communications shall be maintained between the control room and personnel at the refueling station. | ||
ACTIONS CONDITION | APPLICABILITY: | ||
and personnel at the refueling station cannot be maintained. | During CORE ALTERATIONS. | ||
TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE | ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. | ||
Direct communications between the control room and personnel at the refueling station cannot be maintained. | |||
A.1 Suspend all CORE ALTERATIONS. | |||
Immediately TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.2.1 Demonstrate that direct communications between the control room and personnel at the refueling station are established. | |||
1 hour prior to the start of CORE ALTERATIONS AND Each 12 hours during CORE ALTERATIONS | |||
Refueling Machine TR 3.9.3 TR 3.9 REFUELING OPERATIONS TR 3.9.3 Refueling Machine TR 3.9.3 | Refueling Machine TR 3.9.3 Watts Bar - Unit 2 3.9-3 Technical Requirements (developmental) | ||
: a. The Refueling Machine shall have a capacity of | A TR 3.9 REFUELING OPERATIONS TR 3.9.3 Refueling Machine TR 3.9.3 The Refueling Machine and Auxiliary Hoist shall be used for movement of fuel assemblies or drive shafts and shall be OPERABLE as follows: | ||
: b. The Auxiliary Hoist shall have a capacity of | : a. The Refueling Machine shall have a capacity of 3150 pounds, and two electrical overload cutoff limits of 2650 pounds and 2800 pounds, respectively. | ||
APPLICABILITY: | : b. The Auxiliary Hoist shall have a capacity of 1200 pounds and a load indicator shall be used to indicate the lifting of loads > 1190 pounds. | ||
ACTIONS CONDITION | APPLICABILITY: | ||
B. Auxiliary Hoist inoperable. | During movement of fuel assemblies or drive shafts within the reactor pressure vessel. | ||
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. | |||
Refueling Machine inoperable. | |||
A.1 Suspend use of Refueling Machine from operations involving the movement of fuel assemblies within the reactor pressure vessel. | |||
Immediately B. | |||
Auxiliary Hoist inoperable. | |||
B.1 Suspend use of Auxiliary Hoist from operations involving the movement of drive shafts within the reactor pressure vessel. | |||
Immediately | |||
Refueling Machine TR 3.9.3 TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE | Refueling Machine TR 3.9.3 Watts Bar - Unit 2 3.9-4 Technical Requirements (developmental) | ||
A TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.3.1 For each required Refueling Machine, perform a load test of 3150 pounds and demonstrate an automatic electrical load cutoff before the crane load is | |||
> 2650 pounds. Demonstrate a second automatic electrical load cutoff before the crane load is | |||
TSR 3.9.3.2 | > 2800 pounds. | ||
18 months TSR 3.9.3.2 For each required Auxiliary Hoist and associated load indicator, perform a load test of 1200 pounds. | |||
Within 100 hours prior to start of movement of drive shafts within the reactor pressure vessel | |||
Crane Travel - Spent Fuel Storage Pool Building TR 3.9.4 TR 3.9 REFUELING OPERATIONS TR 3.9.4 Crane Travel - Spent Fuel Storage Pool Building TR 3.9.4 | Crane Travel - Spent Fuel Storage Pool Building TR 3.9.4 Watts Bar - Unit 2 3.9-5 Technical Requirements (developmental) | ||
APPLICABILITY: | A TR 3.9 REFUELING OPERATIONS TR 3.9.4 Crane Travel - Spent Fuel Storage Pool Building TR 3.9.4 Loads > 2059 pounds shall be prohibited from travel over fuel assemblies in the spent fuel pool. | ||
APPLICABILITY: | |||
With fuel assemblies in the spent fuel pool. | |||
----------------------------------------------NOTE---------------------------------------------- | |||
TR 3.0.3 is not applicable. | TR 3.0.3 is not applicable. | ||
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. | |||
ACTIONS CONDITION | Technical Requirement not met. | ||
TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE | A.1 Place the crane load in a safe condition. | ||
AND At least once per 7 days thereafter during crane operation | Immediately TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.4.1 Demonstrate crane interlocks and physical stops which prevent crane travel over fuel assemblies to be OPERABLE. | ||
Within 7 days prior to crane use AND At least once per 7 days thereafter during crane operation}} | |||
Latest revision as of 06:27, 14 January 2025
| ML100550630 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 02/02/2010 |
| From: | Tennessee Valley Authority |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML100550630 (5) | |
Text
Decay Time TR 3.9.1 Watts Bar - Unit 2 3.9-1 Technical Requirements (developmental)
A TR 3.9 REFUELING OPERATIONS TR 3.9.1 Decay Time TR 3.9.1 The reactor shall be subcritical for > 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />.
APPLICABILITY:
During movement of irradiated fuel in the reactor vessel.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Reactor subcritical for
< 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />.
A.1 Suspend all operations involving movement of irradiated fuel in the reactor vessel.
Immediately TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.1.1 Verify the reactor has been subcritical for > 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> by confirming the date and time of subcriticality.
Prior to movement of irradiated fuel in the reactor vessel
Communications TR 3.9.2 Watts Bar - Unit 2 3.9-2 Technical Requirements (developmental)
A TR 3.9 REFUELING OPERATIONS TR 3.9.2 Communications TR 3.9.2 Direct communications shall be maintained between the control room and personnel at the refueling station.
APPLICABILITY:
During CORE ALTERATIONS.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Direct communications between the control room and personnel at the refueling station cannot be maintained.
A.1 Suspend all CORE ALTERATIONS.
Immediately TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.2.1 Demonstrate that direct communications between the control room and personnel at the refueling station are established.
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> prior to the start of CORE ALTERATIONS AND Each 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during CORE ALTERATIONS
Refueling Machine TR 3.9.3 Watts Bar - Unit 2 3.9-3 Technical Requirements (developmental)
A TR 3.9 REFUELING OPERATIONS TR 3.9.3 Refueling Machine TR 3.9.3 The Refueling Machine and Auxiliary Hoist shall be used for movement of fuel assemblies or drive shafts and shall be OPERABLE as follows:
- a. The Refueling Machine shall have a capacity of 3150 pounds, and two electrical overload cutoff limits of 2650 pounds and 2800 pounds, respectively.
- b. The Auxiliary Hoist shall have a capacity of 1200 pounds and a load indicator shall be used to indicate the lifting of loads > 1190 pounds.
APPLICABILITY:
During movement of fuel assemblies or drive shafts within the reactor pressure vessel.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Refueling Machine inoperable.
A.1 Suspend use of Refueling Machine from operations involving the movement of fuel assemblies within the reactor pressure vessel.
Immediately B.
Auxiliary Hoist inoperable.
B.1 Suspend use of Auxiliary Hoist from operations involving the movement of drive shafts within the reactor pressure vessel.
Immediately
Refueling Machine TR 3.9.3 Watts Bar - Unit 2 3.9-4 Technical Requirements (developmental)
A TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.3.1 For each required Refueling Machine, perform a load test of 3150 pounds and demonstrate an automatic electrical load cutoff before the crane load is
> 2650 pounds. Demonstrate a second automatic electrical load cutoff before the crane load is
> 2800 pounds.
18 months TSR 3.9.3.2 For each required Auxiliary Hoist and associated load indicator, perform a load test of 1200 pounds.
Within 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior to start of movement of drive shafts within the reactor pressure vessel
Crane Travel - Spent Fuel Storage Pool Building TR 3.9.4 Watts Bar - Unit 2 3.9-5 Technical Requirements (developmental)
A TR 3.9 REFUELING OPERATIONS TR 3.9.4 Crane Travel - Spent Fuel Storage Pool Building TR 3.9.4 Loads > 2059 pounds shall be prohibited from travel over fuel assemblies in the spent fuel pool.
APPLICABILITY:
With fuel assemblies in the spent fuel pool.
NOTE----------------------------------------------
TR 3.0.3 is not applicable.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Technical Requirement not met.
A.1 Place the crane load in a safe condition.
Immediately TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.4.1 Demonstrate crane interlocks and physical stops which prevent crane travel over fuel assemblies to be OPERABLE.
Within 7 days prior to crane use AND At least once per 7 days thereafter during crane operation