{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY RELATED INFORMATION  
                                                  UNITED STATES
                                      NUCLEAR REGULATORY COMMISSION
UNITED STATES  
                                                      REGION II
NUCLEAR REGULATORY COMMISSION  
                                    245 PEACHTREE CENTER AVENUE NE, SUITE 1200
REGION II  
                                            ATLANTA, GEORGIA 30303-1257
245 PEACHTREE CENTER AVENUE NE, SUITE 1200  
                                                January 16, 2014
ATLANTA, GEORGIA 30303-1257  
      Mr. Mano Nazar
      Executive Vice President
Enclosure transmitted herewith contains SUNSI.  When separated from enclosure, this
        and Chief Nuclear Officer
transmittal document is decontrolled
      Florida Power and Light Company
      P.O. Box 14000
LIMITED INTERNAL
      Juno Beach, FL 33408-0420
DISTRIBUTION PERMITTED
      SUBJECT:         TURKEY POINT NUCLEAR POWER PLANT - NOTIFICATION OF CYBER
                      SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
                      INFORMATION (NRC INSPECTION REPORT NO. 05000250/2014404 AND
                      05000251/2014404)
January 16, 2014  
      Dear Mr. Nazar:
      The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Mr. Mano Nazar  
      Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements
Executive Vice President  
      specified by the conditions of your operating license at the Turkey Point Nuclear Plant Units 3 &
  and Chief Nuclear Officer  
      4, on May 19 - 23, 2014. The inspection team will be led by Mr. Rodney Fanner, Reactor
Florida Power and Light Company  
      Inspector, of the NRC RII office. The team will be composed of personnel from the NRC RII
P.O. Box 14000  
      office and personnel from the NRC office of Nuclear Security and Incident Response (NSIR).
Juno Beach, FL 33408-0420  
      The inspection will be conducted in accordance with Temporary Instruction (TI) 2201/004,
      Inspection of Implementation of Interim Cyber Security Milestones 1-7. The TI inspection will
      be performed to evaluate and verify your ability to meet the interim milestone requirements of
SUBJECT:
      the NRCs Cyber Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73,
TURKEY POINT NUCLEAR POWER PLANT - NOTIFICATION OF CYBER  
      Section 54, Protection of Digital Computer and Communication Systems and Networks.
SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR  
      During a telephone conversation on January 13, 2014, Mr. Fanner confirmed with Mr. P. Czaya
INFORMATION (NRC INSPECTION REPORT NO. 05000250/2014404 AND  
      of your staff, arrangements for an information-gathering site visit and a one-week onsite
05000251/2014404)  
      inspection. The schedule is as follows:
          * Information gathering visit: April 29 - May 1, 2014
Dear Mr. Nazar:  
          * Onsite inspection: May 19 - 23, 2014
      The purpose of the information gathering visit is to: (1) obtain information and documentation
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)  
      needed to support the TI inspection; (2) become familiar with the Turkey Point Nuclear Power
Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements  
      Plant Cyber Security Program and plant layout; and (3) arrange administrative details, such as
specified by the conditions of your operating license at the Turkey Point Nuclear Plant Units 3 &  
Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this
4, on May 19 - 23, 2014. The inspection team will be led by Mr. Rodney Fanner, Reactor  
transmittal document is decontrolled
Inspector, of the NRC RII office. The team will be composed of personnel from the NRC RII  
LIMITED INTERNAL
office and personnel from the NRC office of Nuclear Security and Incident Response (NSIR).
DISTRIBUTION PERMITTED
The inspection will be conducted in accordance with Temporary Instruction (TI) 2201/004,  
                  OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Inspection of Implementation of Interim Cyber Security Milestones 1-7. The TI inspection will  
be performed to evaluate and verify your ability to meet the interim milestone requirements of  
the NRCs Cyber Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73,  
Section 54, Protection of Digital Computer and Communication Systems and Networks.  
During a telephone conversation on January 13, 2014, Mr. Fanner confirmed with Mr. P. Czaya  
of your staff, arrangements for an information-gathering site visit and a one-week onsite  
inspection. The schedule is as follows:
*  
Information gathering visit: April 29 - May 1, 2014
*  
Onsite inspection: May 19 - 23, 2014  
The purpose of the information gathering visit is to: (1) obtain information and documentation  
needed to support the TI inspection; (2) become familiar with the Turkey Point Nuclear Power  
Plant Cyber Security Program and plant layout; and (3) arrange administrative details, such as  


                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION  
M. Nazar                                       2
M. Nazar  
office space, availability of knowledgeable office personnel and to ensure unescorted site
2  
access privileges.
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
In order to assure a productive TI inspection, we have enclosed a request for documents
needed to ensure the inspectors are adequately prepared. These documents have been
office space, availability of knowledgeable office personnel and to ensure unescorted site  
divided into three groups (I, II, & III). Group I lists information necessary to aid the inspectors in
access privileges.  
planning for the TI inspection prior to the information gathering visit. It is requested that this
information be provided to the lead inspector via mail no later than April 18, 2014. Group II lists
In order to assure a productive TI inspection, we have enclosed a request for documents  
information and possible areas for discussion necessary to assist the inspectors during the
needed to ensure the inspectors are adequately prepared. These documents have been  
TI inspection. It is requested this information be available during the information gathering visit
divided into three groups (I, II, & III). Group I lists information necessary to aid the inspectors in  
April 29, 2014. Group III consists of those items that the inspectors will review, or need access
planning for the TI inspection prior to the information gathering visit. It is requested that this  
to, during the TI inspection. Group III also lists the information necessary to aid the inspectors
information be provided to the lead inspector via mail no later than April 18, 2014. Group II lists  
in tracking questions and answers identified as a result of the TI inspection. It is requested that
information and possible areas for discussion necessary to assist the inspectors during the  
this information be provided to the lead inspector as the information is generated during the
TI inspection. It is requested this information be available during the information gathering visit  
TI inspection. It is important that all of these documents are up to date and complete in order to
April 29, 2014. Group III consists of those items that the inspectors will review, or need access  
minimize the number of additional documents requested during the preparation and/or the
to, during the TI inspection. Group III also lists the information necessary to aid the inspectors  
onsite portions of the TI inspection.
in tracking questions and answers identified as a result of the TI inspection. It is requested that  
This letter does not contain new or amended information collection requirements subject to the
this information be provided to the lead inspector as the information is generated during the  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
TI inspection. It is important that all of these documents are up to date and complete in order to  
minimize the number of additional documents requested during the preparation and/or the  
onsite portions of the TI inspection.  
This letter does not contain new or amended information collection requirements subject to the  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
requirements were approved by the Office of Management and Budget, control number 3150-
requirements were approved by the Office of Management and Budget, control number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a  
request for information or an information collection requirement unless the requesting document
request for information or an information collection requirement unless the requesting document  
displays a currently valid Office of Management and Budget control number.
displays a currently valid Office of Management and Budget control number.  
Your cooperation and support during this inspection will be appreciated. If you have questions
concerning this inspection, or the inspection team's information or logistical needs, please
Your cooperation and support during this inspection will be appreciated. If you have questions  
contact Mr. Fanner at (404) 997-4638, or me at (404) 997-4521.
concerning this inspection, or the inspection team's information or logistical needs, please  
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
contact Mr. Fanner at (404) 997-4638, or me at (404) 997-4521.  


                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION  
M. Nazar                                       3
M. Nazar  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
3  
available electronically for public inspection in the NRC Public Document Room or from the
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
Publicly Available Records (PARS) component of NRC's document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be  
Public Electronic Reading Room). However, because of the security-related concerns
available electronically for public inspection in the NRC Public Document Room or from the  
contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters
Publicly Available Records (PARS) component of NRC's document system, ADAMS.  
enclosure will not be available for public inspection.
                                                Sincerely,
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the  
                                                /RA/
Public Electronic Reading Room). However, because of the security-related concerns  
                                                Scott M. Shaeffer, Chief
contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters  
                                                Engineering Branch 2
enclosure will not be available for public inspection.
                                                Division of Reactor Safety
Docket Nos.: 50-250, 50-251
Sincerely,  
License Nos.: DPR-31, DPR-41
Enclosure: Document Request For Cyber Security
            Temporary Instruction (TI) 2201/004 Interim
            Milestones 1-7 Inspection
            (OFFICIAL USE ONLY)
cc: (See page 4)
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
/RA/  
Scott M. Shaeffer, Chief  
Engineering Branch 2  
Division of Reactor Safety
Docket Nos.: 50-250, 50-251  
License Nos.: DPR-31, DPR-41  
Enclosure: Document Request For Cyber Security
      Temporary Instruction (TI) 2201/004 Interim
      Milestones 1-7 Inspection
      (OFFICIAL USE ONLY)  
cc: (See page 4)  




_ML14021A097__________                       x SUNSI REVIEW COMPLETE G FORM 665 ATTACHED
_ML14021A097__________  
OFFICE           RII:DRS       RII:DRS
SIGNATURE            RJF2        SMS
x SUNSI REVIEW COMPLETE G FORM 665 ATTACHED  
NAME              RFANNER        SSHAEFFER
OFFICE  
DATE                  1/16/2014      1/ 16/2014      1/  /2014        1/ /2014      1/ /2014        1/ /2014    1/ /2014
RII:DRS  
E-MAIL COPY?        YES    NO    YES      NO     YES      NO      YES    NO      YES    NO      YES    NO    YES    NO
RII:DRS  
   
   
   
SIGNATURE
     RJF2
SMS
          
          
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
M. Nazar                             4
cc:
Michael Kiley
Site Vice President
NAME
Turkey Point Nuclear Power Plant
RFANNER
P.O. Box 14000
SSHAEFFER
Juno Beach, FL 33408-0420
Robert Tomonto
Licensing Manager
Turkey Point Nuclear Power Plant
P.O. Box 14000
DATE
1/16/2014
1/ 16/2014
1/    /2014
1/    /2014
1/    /2014
1/    /2014
1/      /2014
E-MAIL COPY?
    YES
NO   
  YES
NO      YES
NO   
  YES
NO   
  YES
NO      YES
NO   
  YES
NO   
 
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION  
M. Nazar  
4  
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
cc:  
Michael Kiley  
Site Vice President  
Turkey Point Nuclear Power Plant  
P.O. Box 14000  
Juno Beach, FL 33408-0420  
Robert Tomonto  
Licensing Manager  
Turkey Point Nuclear Power Plant  
P.O. Box 14000  
Juno Beach, FL 33408-0420
Juno Beach, FL 33408-0420
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION


                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION  
Letter to Mano Nazar from Scott Shaeffer dated Janaury 16, 2014
SUBJECT:       TURKEY POINT NUCLEAR PLANT - NOTIFICATION OF CYBER SECURITY TI
              MILESTONES 1-7 INSPECTION AND REQUEST FOR INFORMATION (NRC
              INSPECTION REPORT NO. 05000250/2014404 AND 05000251/2014404)
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
Distribution:
RidsNrrPMTurkey Point
Letter to Mano Nazar from Scott Shaeffer dated Janaury 16, 2014  
C. Evans, RII EICS
L. Douglas, RII EICS
SUBJECT:
G. West, NSIR (hard copy w/ encl)
TURKEY POINT NUCLEAR PLANT - NOTIFICATION OF CYBER SECURITY TI  
MILESTONES 1-7 INSPECTION AND REQUEST FOR INFORMATION (NRC  
INSPECTION REPORT NO. 05000250/2014404 AND 05000251/2014404)  
Distribution:  
RidsNrrPMTurkey Point  
C. Evans, RII EICS
L. Douglas, RII EICS  
G. West, NSIR (hard copy w/ encl)  
RIDSNRRDIRS
RIDSNRRDIRS
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
}}
}}

Latest revision as of 23:51, 10 January 2025

Notification of Cyber Security Ti Milestones 1-7 Inspection and Request for Information (NRC Inspection Report No. 05000250-14-404 and 05000251-14-404)
ML14021A097
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/16/2014
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Nazar M
Florida Power & Light Co
References
IR-14-404
Download: ML14021A097 (6)


See also: IR 05000250/2014404

Text

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this

transmittal document is decontrolled

LIMITED INTERNAL

DISTRIBUTION PERMITTED

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

January 16, 2014

Mr. Mano Nazar

Executive Vice President

and Chief Nuclear Officer

Florida Power and Light Company

P.O. Box 14000

Juno Beach, FL 33408-0420

SUBJECT:

TURKEY POINT NUCLEAR POWER PLANT - NOTIFICATION OF CYBER

SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR

INFORMATION (NRC INSPECTION REPORT NO. 05000250/2014404 AND

05000251/2014404)

Dear Mr. Nazar:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements

specified by the conditions of your operating license at the Turkey Point Nuclear Plant Units 3 &

4, on May 19 - 23, 2014. The inspection team will be led by Mr. Rodney Fanner, Reactor

Inspector, of the NRC RII office. The team will be composed of personnel from the NRC RII

office and personnel from the NRC office of Nuclear Security and Incident Response (NSIR).

The inspection will be conducted in accordance with Temporary Instruction (TI) 2201/004,

Inspection of Implementation of Interim Cyber Security Milestones 1-7. The TI inspection will

be performed to evaluate and verify your ability to meet the interim milestone requirements of

the NRCs Cyber Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73,

Section 54, Protection of Digital Computer and Communication Systems and Networks.

During a telephone conversation on January 13, 2014, Mr. Fanner confirmed with Mr. P. Czaya

of your staff, arrangements for an information-gathering site visit and a one-week onsite

inspection. The schedule is as follows:

Information gathering visit: April 29 - May 1, 2014

Onsite inspection: May 19 - 23, 2014

The purpose of the information gathering visit is to: (1) obtain information and documentation

needed to support the TI inspection; (2) become familiar with the Turkey Point Nuclear Power

Plant Cyber Security Program and plant layout; and (3) arrange administrative details, such as

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

M. Nazar

2

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

office space, availability of knowledgeable office personnel and to ensure unescorted site

access privileges.

In order to assure a productive TI inspection, we have enclosed a request for documents

needed to ensure the inspectors are adequately prepared. These documents have been

divided into three groups (I, II, & III). Group I lists information necessary to aid the inspectors in

planning for the TI inspection prior to the information gathering visit. It is requested that this

information be provided to the lead inspector via mail no later than April 18, 2014. Group II lists

information and possible areas for discussion necessary to assist the inspectors during the

TI inspection. It is requested this information be available during the information gathering visit

April 29, 2014. Group III consists of those items that the inspectors will review, or need access

to, during the TI inspection. Group III also lists the information necessary to aid the inspectors

in tracking questions and answers identified as a result of the TI inspection. It is requested that

this information be provided to the lead inspector as the information is generated during the

TI inspection. It is important that all of these documents are up to date and complete in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the TI inspection.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Mr. Fanner at (404) 997-4638, or me at (404) 997-4521.

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

M. Nazar

3

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room). However, because of the security-related concerns

contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters

enclosure will not be available for public inspection.

Sincerely,

/RA/

Scott M. Shaeffer, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos.: 50-250, 50-251

License Nos.: DPR-31, DPR-41

Enclosure: Document Request For Cyber Security

Temporary Instruction (TI) 2201/004 Interim

Milestones 1-7 Inspection

(OFFICIAL USE ONLY)

cc: (See page 4)

_ML14021A097__________

x SUNSI REVIEW COMPLETE G FORM 665 ATTACHED

OFFICE

RII:DRS

RII:DRS

SIGNATURE

RJF2

SMS

NAME

RFANNER

SSHAEFFER

DATE

1/16/2014

1/ 16/2014

1/ /2014

1/ /2014

1/ /2014

1/ /2014

1/ /2014

E-MAIL COPY?

YES

NO

YES

NO YES

NO

YES

NO

YES

NO YES

NO

YES

NO

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

M. Nazar

4

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

cc:

Michael Kiley

Site Vice President

Turkey Point Nuclear Power Plant

P.O. Box 14000

Juno Beach, FL 33408-0420

Robert Tomonto

Licensing Manager

Turkey Point Nuclear Power Plant

P.O. Box 14000

Juno Beach, FL 33408-0420

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

Letter to Mano Nazar from Scott Shaeffer dated Janaury 16, 2014

SUBJECT:

TURKEY POINT NUCLEAR PLANT - NOTIFICATION OF CYBER SECURITY TI

MILESTONES 1-7 INSPECTION AND REQUEST FOR INFORMATION (NRC

INSPECTION REPORT NO. 05000250/2014404 AND 05000251/2014404)

Distribution:

RidsNrrPMTurkey Point

C. Evans, RII EICS

L. Douglas, RII EICS

G. West, NSIR (hard copy w/ encl)

RIDSNRRDIRS