ML14021A097
| ML14021A097 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 01/16/2014 |
| From: | Scott Shaeffer NRC/RGN-II/DRS/EB2 |
| To: | Nazar M Florida Power & Light Co |
| References | |
| IR-14-404 | |
| Download: ML14021A097 (6) | |
See also: IR 05000250/2014404
Text
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this
transmittal document is decontrolled
LIMITED INTERNAL
DISTRIBUTION PERMITTED
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
January 16, 2014
Mr. Mano Nazar
Executive Vice President
and Chief Nuclear Officer
Florida Power and Light Company
P.O. Box 14000
Juno Beach, FL 33408-0420
SUBJECT:
TURKEY POINT NUCLEAR POWER PLANT - NOTIFICATION OF CYBER
SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR
INFORMATION (NRC INSPECTION REPORT NO. 05000250/2014404 AND
Dear Mr. Nazar:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements
specified by the conditions of your operating license at the Turkey Point Nuclear Plant Units 3 &
4, on May 19 - 23, 2014. The inspection team will be led by Mr. Rodney Fanner, Reactor
Inspector, of the NRC RII office. The team will be composed of personnel from the NRC RII
office and personnel from the NRC office of Nuclear Security and Incident Response (NSIR).
The inspection will be conducted in accordance with Temporary Instruction (TI) 2201/004,
Inspection of Implementation of Interim Cyber Security Milestones 1-7. The TI inspection will
be performed to evaluate and verify your ability to meet the interim milestone requirements of
the NRCs Cyber Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73,
Section 54, Protection of Digital Computer and Communication Systems and Networks.
During a telephone conversation on January 13, 2014, Mr. Fanner confirmed with Mr. P. Czaya
of your staff, arrangements for an information-gathering site visit and a one-week onsite
inspection. The schedule is as follows:
Information gathering visit: April 29 - May 1, 2014
Onsite inspection: May 19 - 23, 2014
The purpose of the information gathering visit is to: (1) obtain information and documentation
needed to support the TI inspection; (2) become familiar with the Turkey Point Nuclear Power
Plant Cyber Security Program and plant layout; and (3) arrange administrative details, such as
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
M. Nazar
2
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
office space, availability of knowledgeable office personnel and to ensure unescorted site
access privileges.
In order to assure a productive TI inspection, we have enclosed a request for documents
needed to ensure the inspectors are adequately prepared. These documents have been
divided into three groups (I, II, & III). Group I lists information necessary to aid the inspectors in
planning for the TI inspection prior to the information gathering visit. It is requested that this
information be provided to the lead inspector via mail no later than April 18, 2014. Group II lists
information and possible areas for discussion necessary to assist the inspectors during the
TI inspection. It is requested this information be available during the information gathering visit
April 29, 2014. Group III consists of those items that the inspectors will review, or need access
to, during the TI inspection. Group III also lists the information necessary to aid the inspectors
in tracking questions and answers identified as a result of the TI inspection. It is requested that
this information be provided to the lead inspector as the information is generated during the
TI inspection. It is important that all of these documents are up to date and complete in order to
minimize the number of additional documents requested during the preparation and/or the
onsite portions of the TI inspection.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
Your cooperation and support during this inspection will be appreciated. If you have questions
concerning this inspection, or the inspection team's information or logistical needs, please
contact Mr. Fanner at (404) 997-4638, or me at (404) 997-4521.
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
M. Nazar
3
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC's document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room). However, because of the security-related concerns
contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters
enclosure will not be available for public inspection.
Sincerely,
/RA/
Scott M. Shaeffer, Chief
Engineering Branch 2
Division of Reactor Safety
Docket Nos.: 50-250, 50-251
Enclosure: Document Request For Cyber Security
Temporary Instruction (TI) 2201/004 Interim
Milestones 1-7 Inspection
(OFFICIAL USE ONLY)
cc: (See page 4)
_ML14021A097__________
x SUNSI REVIEW COMPLETE G FORM 665 ATTACHED
OFFICE
RII:DRS
RII:DRS
SIGNATURE
RJF2
SMS
NAME
RFANNER
SSHAEFFER
DATE
1/16/2014
1/ 16/2014
1/ /2014
1/ /2014
1/ /2014
1/ /2014
1/ /2014
E-MAIL COPY?
YES
NO
YES
NO YES
NO
YES
NO
YES
NO YES
NO
YES
NO
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
M. Nazar
4
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
cc:
Michael Kiley
Site Vice President
Turkey Point Nuclear Power Plant
P.O. Box 14000
Juno Beach, FL 33408-0420
Robert Tomonto
Licensing Manager
Turkey Point Nuclear Power Plant
P.O. Box 14000
Juno Beach, FL 33408-0420
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
Letter to Mano Nazar from Scott Shaeffer dated Janaury 16, 2014
SUBJECT:
TURKEY POINT NUCLEAR PLANT - NOTIFICATION OF CYBER SECURITY TI
MILESTONES 1-7 INSPECTION AND REQUEST FOR INFORMATION (NRC
INSPECTION REPORT NO. 05000250/2014404 AND 05000251/2014404)
Distribution:
RidsNrrPMTurkey Point
C. Evans, RII EICS
L. Douglas, RII EICS
G. West, NSIR (hard copy w/ encl)
RIDSNRRDIRS