{{#Wiki_filter:ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                                 NO. SNCF164-RPT-01, VERSION 2.0 r-   Z-Sheetj  gf  A' Status: Y2ý'NE-I U["I Seismic Walkdown Checklist (SWC)
{{#Wiki_filter:ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 r-Z-
Equipment ID No. QIG31HOOO1A                      Equip. Class    _° Equipment Description SPENT FUEL HEAT EXCHANGER 1A Location: Bldg. AUXILIARY Floor El. 155                     Room, Area       ,446',
Seismic Walkdown Checklist (SWC)
Equipment ID No. QIG31HOOO1A Equip. Class Sheet j g f A'
Status: Y2ý'NE-I U["I
_° Equipment Description SPENT FUEL HEAT EXCHANGER 1A Location: Bldg. AUXILIARY Floor El. 155 Room, Area  
,446',
Manufacturer, Model, Etc. (optional but recommended)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
b/- 76548                        A
/-
                                                                  //-
b 7 6548
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             Y    ND UD N/AD
//-
: 3. Is the anchorage free of corrosion that is more than mild surface             V    ND UliD N/AD oxidation?
A
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?     YkND UD N/AD
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 5. Is the anchorage configuration consistent with plant documentation?           Y2ND UO N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of             YpNO Ut-potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
Enter the equipment class name from Appendix B: Classes of Equipment.
: 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y ND UD N/AD V
ND UliD N/AD YkND UD N/AD Y2ND UO N/AD YpNO Ut-Enter the equipment class name from Appendix B: Classes of Equipment.
Page 543 of 562
Page 543 of 562


ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                           NO. SNCF164-RPT-01, VERSION 2.0
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0
      -rl -   Q) g-1                                                                               Sheet Status: Y'k U[]
-rl - Q) g-1 Sheet Status: Y'k U[]
Seismic Walkdown Checklist (SWC)
Seismic Walkdown Checklist (SWC)
Equipment ID No. QIG31HOOOIA                 Equip. Class, 21 Equipment Description SPENTFUEL_HE T EXCHANGER 1A Interaction Effects
Equipment ID No. QIG31HOOOIA Equip. Class, 21 Equipment Description SPENT FUEL_ HE T EXCHANGER 1A Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?     Y    ND    5U0 N/ADI
: 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,       "0        N/AD and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?                 "NOD          N/AD
: 9. Do attached lines have adequate flexibility to avoid damage?
: 10. Based on the above seismic interaction evaluations, is equipment free     Y8      uD of potentially adverse seismic interaction effects?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Other Adverse Conditions                                                               7 I1. Have you looked for and found no other seismic conditions that could     Y[V     - UD adversely affect the safety functions of the equipment?
Y ND 5U0 N/ADI "0
Comments (Additional pages may be added as necessary) 19,     -iv Evaluated by:                                         t7W ILLA                    Date: 2, /1Z4Oz Q    '.-..
N/AD "NOD N/AD Y8 uD Other Adverse Conditions 7
                        -I---          --
I1. Have you looked for and found no other seismic conditions that could Y[V - UD adversely affect the safety functions of the equipment?
cA                                      V9-    'i-Page 544 of 562
Comments (Additional pages may be added as necessary) 19,  
-iv t7W ILLA Evaluated by:
cA Date: 2, /1Z4Oz V9-
'i-Q
-I---
Page 544 of 562


NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0
                                                                  -n dn Page 545 of 562
-n dn Page 545 of 562


ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-01, VERSION 2.0 Page 546 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 546 of 562


ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCF164-RPT-01, VERSION 2.0 V
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 AI-Sheet: 'of 3 Status: YZ;* NC] UF-'
AI-Sheet: 'of 3 Status: YZ;* NC] UF-'
V Seismic Walkdown Checklist (SWC)
Seismic Walkdown Checklist (SWC)
Equipment ID No. 01G31P0028 Equip. Class' 5 Equipment Description 1B SFP PUMP Location: Bldg. AUXILIARY Floor El. 139 Room, Area 14 Manufacturer, Model, Etc. (optional but recommended)
Equipment ID No. 01G31P0028                       Equip. Class' 5 Equipment Description 1B SFPPUMP Location: Bldg. AUXILIARY Floor El. 139                     Room, Area       14 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions maybe used to record the results ofjudgments and findings. Additional space is provided at the end of this cfecklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions maybe used to record the results ofjudgments and findings. Additional space is provided at the end of this cfecklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one YQJNO of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
P-1 -j'             1AS7&S6                 oc.,t,-, -ý 6
YQJNO P-1 -j' 1AS7&S6 oc., t, -, -ý 6
: 2. Is the anchorage free of bent, broken, missing or loose hardware?           YO/NO UC N/AC
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surface             YVC      UC-- N/AO oxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?   Y1413~ LJO N/AC
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 5. Is the anchorage configuration consistent with plant documentation?           AYN/;"  UC N/AC (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 5. Is the anchorage configuration consistent with plant documentation?
: 6. Based on the above anchorage evaluations, is the anchorage free of           YA 0NO UC potentially adverse seismic conditions?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
IEnter the equipment class name from Appendix B: Classes of Equipment.
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YO/NO UC N/AC YVC UC-- N/AO Y1413~ LJO N/AC AYN/;"
UC N/AC YA 0NO UC IEnter the equipment class name from Appendix B: Classes of Equipment.
Page 547 of 562
Page 547 of 562


ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                         NO. SNCF164-RPT-01, VERSION 2.0 r I 50a                                                                                 Sheet 2 of 3 Status: YI*f NEI uE-1 Seismic Walkdown Checklist (SWC)
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 r I 50a Sheet 2 of 3 Status: YI*f NEI uE-1 Seismic Walkdown Checklist (SWC)
Equipment ID No. Q1G31PO02B                   Equip. Classý Equipment Description 1B SFP PUMP Interaction   ffects
Equipment ID No. Q1G31PO02B Equip. Classý Equipment Description 1B SFP PUMP Interaction ffects
: 7. Are soft targets free from impact by nearby equipment or structures?       Y4*          UQ N/A0
: 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,       Y~r/0UL N/Al]
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?
: 9. Do attached lines have adequate flexibility to avoid damage?               YVN/        UED N/A[3
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Other Adverse Conditions                                                             /
Y4*
11, Have you looked for and found no other seismic conditions that could       YV/No UE' adversely affect the safety functions of the equipment?
UQ N/A0 Y~r/0UL N/Al]
YVN/
UED N/A[3 Other Adverse Conditions  
/
11, Have you looked for and found no other seismic conditions that could YV/No UE' adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
NO&,V Evaluated by:    4~:6Ai WAIA I         I.. FAJ"4,                             Date:   ____z     ______1 IQ C i-f Page 548 of 562
NO&,V 4~:6Ai WAIA I I.. FAJ"4, Evaluated by:
Date:
____z
______1 IQ C i-f Page 548 of 562


k1cocinki 1) n ATTACHMENT 3: SEISMIC WALKDOW N CHECKLISTS                 Nu. S r * .-rxr
k1cocinki 1) n ATTACHMENT 3: SEISMIC WALKDOW N CHECKLISTS Nu. S r  
                                                                  ,o1      ,-0   v, i4 N 41
,o1.-rxr  
* Page 549 of 562
,-0 v,
i4 N 41 Page 549 of 562


ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                               NO. SNCF164-RPT-01, VERSION 2.0 F   [5Wz.-3                                                                       Sheetlof 3 U
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 F [5Wz.-3 Seismic Walkdown Checklist (SWC)
Status: Y;iN[] U[]
Equipment ID No. OIG31VOOIA Equip. Class, 0 Sheetlof 3 Status: Y;iN[] U[]
Seismic Walkdown Checklist (SWC)
U Equipment Description 1A SFP PUMP SUCTION ISO Location: Bldg. AUXILIARY Floor El. 139 Room, Area  
Equipment ID No. OIG31VOOIA                       Equip. Class, 0 Equipment Description 1A SFPPUMP SUCTION ISO Location: Bldg. AUXILIARY Floor El. 139                       Room, Area       - 4 2, Manufacturer, Model, Etc. (optional but recommended)
- 4 2, Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoraue
Anchoraue
: 1. Is the anchorage configuration verification required (i.e., is the item one YO N of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one YO N of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YO] NO] U[- N/Am-
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surface             YO] NO UE] N/A[ý--
: 3. Is the anchorage free of corrosion that is more than mild surface oxidaiion?
oxidaiion?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?     YE] NEI UE' N/A&''
: 5. Is the anchorage configuration consistent with plant documentation?
: 5. Is the anchorage configuration consistent with plant documentation?           YE] NEI UE] N/A[2---'-
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of                 Yi/OUE potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
I Enter the equipment class name from Appendix B: Classes of Equipment, Page 550 of 562
YO] NO] U[- N/Am-YO] NO UE] N/A[ý--
YE] NEI UE' N/A&''
YE] NEI UE] N/A[2---'-
Yi/OUE I Enter the equipment class name from Appendix B: Classes of Equipment, Page 550 of 562


ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                           NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 of 3 Status: YYd U0[]
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Seismic Walkdown Checklist (SWC)
Seismic Walkdown Checklist (SWC)
Equipment ID No. QIG31VOOIA Equip. Class, 0 Equipment Description 1A SFP PUMP SUCTION ISO Sheet 2 of 3 Status: YYd U0[]
Equipment ID No. QIG31VOOIA                   Equip. Class, 0 Equipment Description 1A SFP PUMPSUCTION ISO Interaction Effects
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?     YLý1] U0 N/AQ
: 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, VdlNo UU- N/AQ and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?             YE-N      UMI N/AE
: 9. Do attached lines have adequate flexibility to avoid damage?
: 10. Based on the above seismic interaction evaluations, is equipment free Ya        U0 of potentially adverse seismic interaction effects?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Other Adverse Conditions
YLý1] U0 N/AQ VdlNo UU-N/AQ YE-N UMI N/AE Ya U0 Other Adverse Conditions 7
: 11. Have you looked for and found no other seismic conditions that could     Y*NO 7    U[
: 11. Have you looked for and found no other seismic conditions that could Y*NO U[
adversely affect the safety functions of the equipment?
adversely affect the safety functions of the equipment?
kutL Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
              ~ 44     ~M.A55, 00-4~
~ 44  
Evaluated by:     ,i"-/42ý                                                       Date:         /4       2-.
~M.A55, 00-4~
((ceAv~                                                     Ii Page 551 of 562
kutL Evaluated by:  
,i"-/42ý Date:  
/4 2-.
((ceAv~
Ii Page 551 of 562


ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS           NO. SNCF164-RPT-01, VERSION 2.0 Page 552 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 552 of 562


ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                                 NO. SNCF164-RPT-01, VERSION 2.0 r 15 V7 -
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 I',
r 1 5 V7 -
Sheettu ofJ3 Status: Y Nn] UE]
Sheettu ofJ3 Status: Y Nn] UE]
I',
Seismic Walkdown Checklist (SWC)
Seismic Walkdown Checklist (SWC)
Equipment ID No. QIG31VOO3B                       Equip. Class, 0 Equipment Description 1B SFPHXOUTLETISO Location: Bldg. AUXILIARY Floor EL 155                       Rooa
Equipment ID No. QIG31VOO3B Equip. Class, 0 Equipment Description 1B SFPHXOUTLETISO Location: Bldg. AUXILIARY Floor EL 155 Rooa Manufacturer, Model, Etc. (optional but recommended)
                                                                                    .d~  ;,
.d~ ;,
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchora2e
Anchora2e
: 1. Is the anchorage configuration verification required (i.e., is the item one   YE] N$/
: 1. Is the anchorage configuration verification required (i.e., is the item one YE] N$/
of the 50%/a of SWEL items requiring such verification)?
of the 50%/a of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YE] NO] UE] NiAb''/
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
                        /A/-           '-L/Ale
YE] NO] UE] NiAb''/
: 3. Is the anchorage free of corrosion that is more than mild surface             YEI   NEI UE N/AdLPý oxidation?
/A/-
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?     YE] NE] U17] NIh'
L/Ale
: 5. Is the anchorage configuration consistent with plant documentation?           YE] NEI UE] N/A (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
                                      /9-LIgt               (e-'i       /~/Ai
YEI NEI UE N/AdLPý
: 6. Based on the above anchorage evaluations, is the anchorage free of           YtrNCI      E]
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
potentially adverse seismic conditions?
YE] NE] U17] NIh' YE] NEI UE] N/A
: 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
/9-LIgt (e-'i /~/Ai YtrNCI E]
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Fnter the equipment class name from Appendix B: Classes of Equipment Page 553 of 562
Fnter the equipment class name from Appendix B: Classes of Equipment Page 553 of 562


ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                         NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 of 3 Status: YCN-       U[]
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 of 3 Status: YCN-U[]
Seismic Walkdown Checklist (SWC)
Seismic Walkdown Checklist (SWC)
Equipment ID No. QIG31VO03B                   Equip. Class' Equipment Description 1B SFP HX OUTLET ISO Interaction Effects
Equipment ID No. QIG31VO03B Equip. Class' Equipment Description 1B SFP HX OUTLET ISO Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       Y        JU- N/AE]
: 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y    ND ULJ N/AD and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?               l4NE- UM N/AD
: 9. Do attached lines have adequate flexibility to avoid damage?
: 10. Based on the above seismic interaction evaluations, is equipment free     *f'ND    UD1 of potentially adverse seismic interaction effects?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Other .Adverse Conditions
Y JU-N/AE]
: 11. Have you looked for and found no other seismic conditions that could       xZ'iN3   UD adversely affect the safety functions of the equipment?
Y ND ULJ N/AD l4NE-UM N/AD
*f'ND UD1 Other.Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could xZ'iN3 UD adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated by:    Evaluated'a" by:X                                                 Dae:2/,X2..
Evaluated'a" by:X Dae:2/,X2..
Evaluated by:
Dae: 2-Y1'y - _ 2 Page 554 of 562
Dae: 2-Y1'y - _ 2 Page 554 of 562


ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-01, VERSION 2.0 I
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 I
Page 555 of 562
Page 555 of 562


ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                                 NO. SNCF164-RPT-01, VERSION 2.0 Sheet i ofr4,.*   I Status: Y["'DUE Seismic Walkdown Checklist (SWC)
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet i ofr4,.*
Equipment ID No. QIG31VOO4A                       Equip. Class, Equipment Description 1A SFP COOLING LOOP TO SFP PURIF INLET ISO Location: Bldg. AUXILIARY Floor El. 139                     Room, Area       -- t,-
Status: Y["'DUE I
Seismic Walkdown Checklist (SWC)
Equipment ID No. QIG31VOO4A Equip. Class, Equipment Description 1A SFP COOLING LOOP TO SFP PURIF INLET ISO Location: Bldg. AUXILIARY Floor El. 139 Room, Area  
-- t,-
Manufacturer, Model, Etc. (optional but recommended)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoraf
Anchoraf
: 1. Is the anchorage configuration verification required (i.e., is the item one   YD NO--
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               YIO NO UCN/Ab"*
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface               YO NO UO N/A&d'f oxidation?
YD NO--
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?       YF' NO UO N/A       --'*
YIO NO UCN/Ab"*
: 5. Is the anchorage configuration consistent with plant documentation?             YO NO UO NALJO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YO NO UO N/A&d'f
: 6. Based on the above anchorage evaluations, is the anchorage free of                   NOUO potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
IEnter the equipment class name from Appendix B: Classes of Equipment.
YF' NO UO N/A
: 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YO NO UO NALJO NOUO I Enter the equipment class name from Appendix B: Classes of Equipment.
Page 556 of 562
Page 556 of 562


ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                           NO. SNCF164-RPT-01, VERSION 2.0 Sheet20 f :9 4,4, Status: Y[ee[--f UM-]
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet20 f :9 4,4, Status: Y[ee[--f UM-]
Seismic Walkdown Checklist (SWC)
Seismic Walkdown Checklist (SWC)
Equipment lD No. QG31VOO4A                   Equip. Class, 0 Equipment Description 1A SFP COOLING LOOP TO SFP PURIF INLET ISO Interaction Effects
Equipment lD No. QG31VOO4A Equip. Class, 0 Equipment Description 1A SFP COOLING LOOP TO SFP PURIF INLET ISO Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       Y(Ž   I-] UE] NiA[-]
: 7. Are soft targets free from impact by nearby equipment or structures?
  "          Are overhead equipment, distribution systems, ceiling tiles and lighting, 4if)l       UIE" N/AD
Y(Ž I-] UE] NiA[-]
  ~         and masonry block walls not likely to collapse onto the equipment?
Are overhead equipment, distribution systems, ceiling tiles and lighting, 4if)l UIE" N/AD
: 9. Do attaled lines have adequate flexibility to avoid damage?               ")J*   1-] U[ N/AD3 w,14A), -771 Ai Y
~
: 10. Based on the above seismic interaction evaluations, is equipment free     YtrNO UO of potentially adverse seismic interaction effects?
and masonry block walls not likely to collapse onto the equipment?
: 9. Do attaled lines have adequate flexibility to avoid damage?  
")J*
1-] U[ N/AD3 w,14A), -771 Ai Y
: 10. Based on the above seismic interaction evaluations, is equipment free YtrNO UO of potentially adverse seismic interaction effects?
Other Adverse Conditions
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       A     N< - U-i adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could A
N< -
U-i adversely affect the safety functions of the equipment?
Comments (Additional pages may be added' as necessary)
Comments (Additional pages may be added' as necessary)
Evaluated by:
Evaluated by:
Ziz&4&
Evaluated bv:
Evaluated bv:
                      **        *        *-*
Date:  
* Ziz&4&                      Date:       //.   ? W2
//.  
                                                                                                  '&#xfd;(/li.
? W2
'&#xfd;(/ li.
Page 557 of 562
Page 557 of 562


ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-01, VERSION 2.0 Page 558 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 558 of 562


NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS rm Page 559 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 rm Page 559 of 562


ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCF164-RPT-01, VERSION 2.0 F(15tvz- 4 Sheetf 3 Status: YON[O U[
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 F( 15tvz-4 Seismic Walkdown Checklist (SWC)
Seismic Walkdown Checklist (SWC) i Equipment ID No. Q1G3 IVOO                       Equip. Class' 0 Equipment Description SFE COOLING LOOPRETURN (KEY Z-225)
Equipment ID No. Q1G3 IVOO Equip. Class' 0 Equipment Description SFE COOLING LOOP RETURN (KEY Z-225)
Location: Bldg. AUXILIARY Floor El. 139                     Room, Area Q.L3tA.A Manufacturer, Model, Etc. (optional but recommended)
Sheetf 3 Status: YON[O U[
i Location: Bldg. AUXILIARY Floor El. 139 Room, Area Q.L3tA.A Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is them one     YO Nf of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is them one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?           YO NO UO 4V1 L-/i&           Ce)
YO Nf
:: MPa /j1
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surface           YO NO UO N/An.-
4V1 L- /i&
oxidation?
Ce) MPa /j1
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?   YO NO UIO N/A&;--
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 5. Is the anchorage configuration consistent with plant documentation?         YO NO UQ NIA&-"
YO NO UO YO NO UO N/An.-
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YO NO UIO N/A&;--
: 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of           lb'NO UO potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
IEnter the equipment class name from Appendix B: Classes of Equipment Page 560 of 562
YO NO UQ NIA&-"
lb'NO UO IEnter the equipment class name from Appendix B: Classes of Equipment Page 560 of 562


ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 of 3 Status: YIrNc' umI Seismic Walkdown Checklist (SWC)
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 of 3 Status: YIrNc' umI Seismic Walkdown Checklist (SWC)
Equipment ID No. Q1G31VO06                     Equip. Class' 0 Equipment Description SFP COOLING LOOP RETURN (MEY Z-225)
Equipment ID No. Q1G31VO06 Equip. Class' 0 Equipment Description SFP COOLING LOOP RETURN (MEY Z-225)
Interaction Effects
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       Ytd      UD N/AD
: 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   &NO      UO N/AD and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?               Y(340    U[O N/AD
: 9. Do attached lines have adequate flexibility to avoid damage?
: 10. Based on the above seismic interaction evaluations, is equipment free       Y[BN-    UD of potentially adverse seismic interaction effects?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Other Adverse Conditions
Ytd UD N/AD
: 11. Hlave you looked for and found no other seismic conditions that could       YlM-ND U[D adversely affect the safety functions of the equipment?
&NO UO N/AD Y(3 40 U[O N/AD Y[BN-UD Other Adverse Conditions
5T.rP-r.,                             11-S         /"A"J7     vteAY Comments (Additional pages may be added as necessary)
: 11. Hlave you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Evaluated by:                   //~L~ ,,&2                                        Date:   7./f. 2',,-.
5T.rP-r.,
11-S  
/"A"J7 vteAY YlM-ND U[D Comments (Additional pages may be added as necessary)
Evaluated by:  
,,&2
//~L~
Date:
7./f. 2',,-.
Page 561 of 562
Page 561 of 562


ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS           NO. SNCF164-RPT-01, VERSION 2.0 Page 562 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 562 of 562


ATTACHMENT 5: IPEEE VULNERABILITIES INFORMATION         NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 5 UNIT 1 - IPEEE VULNERABILITIES INFORMATION (Version 1.0 and Version 2.0)
ATTACHMENT 5: IPEEE VULNERABILITIES INFORMATION NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 5 UNIT 1 - IPEEE VULNERABILITIES INFORMATION (Version 1.0 and Version 2.0)
NO. SNCF164-RPT-01 This attachment contains Appendix H from the report entitled, "Joseph M. Farley Nuclear Plant, Unit 1 and Unit 2, Individual Plant Examination of External Events - Seismic" Page 1 of 5
NO. SNCF164-RPT-01 This attachment contains Appendix H from the report entitled, "Joseph M. Farley Nuclear Plant, Unit 1 and Unit 2, Individual Plant Examination of External Events - Seismic" Page 1 of 5


ATTACHMENT 5: IPEEE VULNERABILITIES INFORMATION                             NO. SNCF164-RPT-01, VERSION 2.0 Appendix H UNIT 1 Description of Equipment Outliers Equipment             Equipment Equipment                                             Description of               Outler ID Number               Class   Description             Plant Area                     Outlier                       Resolution AITB0O4                 20     Terminal Box           Auxiliary Building El. 100'   Internal wire may impact     Restrain wire essential relay NiH11NGMCB250OA-AB       20     Main control board     Auxiliary Building El. 155'   Potential Interaction with   Restrain Sect A                                                 overhead light               overhead light QICIiEOO4A-AB             2     Reactor trip switchgear Auxiliary Building El. 121'   Panels not bolted together   Bolt to adjacent No. 1                                                                               panel QIC11E0O4B-AB             2     Reactor trip switchgear Auxiliary Building El. 121'   Panels not bolted together   Bolt to adjacent No. 2                                                                               panel Q0C22LT0485-P2           18   Steam generator I B     Containment building El.       Wre exposed from             Repair conduit narrow range level     155'                           disconnected flex conduit QIE16H003B-B             10   RHR pump room           Auxiliary building El. 83'     Bolts attaching coil to frame Install missing cooler 1A                                             are missing.                 bolts QIF16LT0501-A             18   RWST level transmitter Yard El. 155'                   Anchor bolts are corroded     Replace anchor bolts QIF16LT0502-B             18   RWST level transmitter Yard El. 155'                 Anchor bolts are corroded     Replace anchor bolts Q1H11NGASC2506C-B         20   Aux safeguards         Auxiliary building El. 155'   1. Potential Interaction from 1. Restrain cabinet C                                             overhead light               overhead light
ATTACHMENT 5: IPEEE VULNERABILITIES INFORMATION NO. SNCF164-RPT-01, VERSION 2.0 Appendix H UNIT 1 Description of Equipment Outliers Equipment Equipment Equipment Description of Outler ID Number Class Description Plant Area Outlier Resolution AITB0O4 20 Terminal Box Auxiliary Building El. 100' Internal wire may impact Restrain wire essential relay NiH11NGMCB250OA-AB 20 Main control board Auxiliary Building El. 155' Potential Interaction with Restrain Sect A overhead light overhead light QICIiEOO4A-AB 2
: 2. Potential interaction from 2. Bolt panels panels QSH 11NGR2504,         together QAH11NGH2514-AB, and QlH1lNGSS2504 Qi H11NGASC2506D-A       20   Aux safeguards         Auxiliary building El. 155'   Potential interaction from   Restrain cabinet D                                             overhead light               overhead light Q1 HiiNGB2504J-A         20   BOP instrumentation     Auxiliary building El. 155'   Potential interaction from   Restrain cabinet J                                             overhead light               overhead light Q1 H11NGB2504K-B         20   BOP instrumentation     Auxiliary building El. 155'   Potential interaction from   Restrain cabinet K                                             overhead light               overhead light Qi H11NGCCM2523A-A       20   ICCMS processor         Auxiliary building El. 155'   Potential interaction from   Restrain cabinet train A                                       overhead light               overhead light Q1H 11NGCCM2523B-B       20   ICCMS processor         Auxiliary building El. 155'   Potential interaction from   Restrain cabinet train B                                       overhead light               overhead light Q1 H11NGNIS2503A-1       20   NIS excore detector     Auxiliary building El. 155'   Potential interaction from   Restrain cabinet                                               overhead light               overhead light QlHllNGR25041-AB         20   Radiation monitor       Auxiliary building El. 155'   Potential interaction from   Restrain panel                                                 overhead light               overhead light Q1H11NGSSP2506G-B         20   Solid-state protection Auxiliary building El. 155'   1. Potential Interaction from 1. Restrain input cabinet                                         overhead light               overhead light
Reactor trip switchgear Auxiliary Building El. 121' Panels not bolted together Bolt to adjacent No. 1 panel QIC11E0O4B-AB 2
: 2. Potential interaction from 2. Bolt panels panels                       together NiH11NGMIM2515-N and NlHllNGRYL25060-AB QIH 11NGSSP2505J-B       20   Solid-state protection Auxiliary building El. 155'   Potential interaction from   Restrain input cabinet                                         overhead light               overhead light Q1 H11NGSSP2506K-A       20   Solid-state protection Auxiliary building El. 155'   Potential interaction from   Restrain input cabinet                                         overhead light               overhead light Q1 H11NGSSP2506N-A       20   Solid-state protection Auxiliary building El. 155'   Potential interaction from   Restrain input cabinet                                         overhead light               overhead light Q1 H21E505-B             20   4.16-kv switchgear 1J   Diesel generator building El. Potential interaction from   Restrain local control panel     155'                         overhead light, fan and       overhead light, adjacent conduit             fan and conduit A1TBOO4                   20   Terminal Box           Auxiliary Building El. 100'     Internal wire may impact     Restrain wire essential relay NiH lINGMCB250OA-AB       20     Main control board     Auxiliary Building El. 155'   Potential Interaction with   Restrain A
Reactor trip switchgear Auxiliary Building El. 121' Panels not bolted together Bolt to adjacent No. 2 panel Q0C22LT0485-P2 18 Steam generator I B Containment building El.
_______________ISect                                  overhead light               overhead light Page 2 of 5
Wre exposed from Repair conduit narrow range level 155' disconnected flex conduit QIE16H003B-B 10 RHR pump room Auxiliary building El. 83' Bolts attaching coil to frame Install missing cooler 1A are missing.
bolts QIF16LT0501-A 18 RWST level transmitter Yard El. 155' Anchor bolts are corroded Replace anchor bolts QIF16LT0502-B 18 RWST level transmitter Yard El. 155' Anchor bolts are corroded Replace anchor bolts Q1H11NGASC2506C-B 20 Aux safeguards Auxiliary building El. 155'
: 1. Potential Interaction from
: 1. Restrain cabinet C overhead light overhead light
: 2. Potential interaction from
: 2. Bolt panels panels QSH 11NGR2504, together QAH11NGH2514-AB, and QlH1lNGSS2504 Qi H11NGASC2506D-A 20 Aux safeguards Auxiliary building El. 155' Potential interaction from Restrain cabinet D overhead light overhead light Q1 HiiNGB2504J-A 20 BOP instrumentation Auxiliary building El. 155' Potential interaction from Restrain cabinet J overhead light overhead light Q1 H11NGB2504K-B 20 BOP instrumentation Auxiliary building El. 155' Potential interaction from Restrain cabinet K overhead light overhead light Qi H11NGCCM2523A-A 20 ICCMS processor Auxiliary building El. 155' Potential interaction from Restrain cabinet train A overhead light overhead light Q1H 11NGCCM2523B-B 20 ICCMS processor Auxiliary building El. 155' Potential interaction from Restrain cabinet train B overhead light overhead light Q1 H11NGNIS2503A-1 20 NIS excore detector Auxiliary building El. 155' Potential interaction from Restrain cabinet overhead light overhead light QlHllNGR25041-AB 20 Radiation monitor Auxiliary building El. 155' Potential interaction from Restrain panel overhead light overhead light Q1H11NGSSP2506G-B 20 Solid-state protection Auxiliary building El. 155'
: 1. Potential Interaction from
: 1. Restrain input cabinet overhead light overhead light
: 2. Potential interaction from
: 2. Bolt panels panels together NiH11NGMIM2515-N and NlHllNGRYL25060-AB QIH 11NGSSP2505J-B 20 Solid-state protection Auxiliary building El. 155' Potential interaction from Restrain input cabinet overhead light overhead light Q1 H11NGSSP2506K-A 20 Solid-state protection Auxiliary building El. 155' Potential interaction from Restrain input cabinet overhead light overhead light Q1 H11NGSSP2506N-A 20 Solid-state protection Auxiliary building El. 155' Potential interaction from Restrain input cabinet overhead light overhead light Q1 H21E505-B 20 4.16-kv switchgear 1J Diesel generator building El. Potential interaction from Restrain local control panel 155' overhead light, fan and overhead light, adjacent conduit fan and conduit A1TBOO4 20 Terminal Box Auxiliary Building El. 100' Internal wire may impact Restrain wire essential relay NiH lINGMCB250OA-AB 20 Main control board Auxiliary Building El. 155' Potential Interaction with Restrain
_______________ISect A
overhead light overhead light Page 2 of 5


ATTACHMENT 5: IPEEE VULNERABILITIES INFORMATION                                 NO. SNCF164-RPT-01, VERSION 2.0 Appendix H UNIT 1 Description of Equipment Outliers Equipment             Equipment Equipment                                                 Description of                 Outlier ID Number             Class     Description               Plant Area                     Outlier                       Resolution Q1 H21E506-A               20   4.16-kv switchgear 1K     Service water intake           Potential interaction from     Restrain local control panel       structure El. 188'-6"           overhead light                 overhead light Q1 H21E507-B               20   4.16-kv switchgear 1L     Service water intake           Potential interaction from     Restrain local control panel       structure El. 188'-6"           overhead light                 overhead light Q1 H21 E527-B             20   Diesel generator 1B      Diesel generator building El. 1. Potential interaction for   1. Restrain local control panel       155'                           overhead light                 overhead light
ATTACHMENT 5: IPEEE VULNERABILITIES INFORMATION NO. SNCF164-RPT-01, VERSION 2.0 Appendix H UNIT 1 Description of Equipment Outliers Equipment Equipment Equipment Description of Outlier ID Number Class Description Plant Area Outlier Resolution Q1 H21E506-A 20 4.16-kv switchgear 1K Service water intake Potential interaction from Restrain local control panel structure El. 188'-6" overhead light overhead light Q1 H21E507-B 20 4.16-kv switchgear 1L Service water intake Potential interaction from Restrain local control panel structure El. 188'-6" overhead light overhead light Q1 H21 E527-B 20 Diesel generator 1 B Diesel generator building El.
: 2. Inadequate anchorage       2. Modify anchorage Q1H22L002-A               20   Transfer relay cabinet   Auxiliary building El. 139'     Panel not bolted to adjacent   Bolt panel to 1                                                       MCC                           adjacent MCC Q1 H22L503-B               20   Diesel local relay panel Diesel building El. 155'       Potential interaction from     Restrain 1B                                                       overhead light                 overhead light Q1H23S544B-B               20   Diesel generator room Diesel generator building     El. Potential interaction from     Restrain 1B HVAC LCS             155'                           overhead light                 overhead light Q1P16V579-B                 7   B train service water   Service water intake El.       Potential interaction for     Restrain loose min-flow                 188'-6"                         loose cables                   cables Q1 Ri 1B503-A               4   LC transformer 1R        Diesel generator building   El. Potential bolt bending         Resolved by 155'                           concern                       analysis Q1 R1 1B504-A               4   LC transformer 1K       Service water intake El.       Potential bolt bending         Resolved by 188'-6"                         concem                         analysis Q1 Ri 1B505-B               4   LC transformer 1L        Service water intake El.       Bold spins under torque       Repair bolt 188'-6" Q1 R11B507-B               4   LC transformer 1S       Diesel generator building   El. Potential interaction from     Restrain locker 155'                           locker Q1R15A503-A                 3   4.16-kV switchgear 1H Diesel generator building     El. Potential interaction from     Restrain 155'                           overhead light                 overhead light Q1R15A504-B                 3   4.16-kv switchgear 1J   Diesel generator building   El. Potential interaction from     Restrain 155'                           overhead light and nearby     overhead light, platform                       secure platform Q1R15A505-A                 3   4.16-kv switchgear 1K   Service water intake El.       Potential interaction from     Restrain 188'-6"                       overhead light                 overhead light Q1R15A506-B                 3   4.16-kv switchgear 1L   Service water intake El.       Potential interaction from     Restrain 188'-6"                       overhead light                 overhead light Q1R16B006-A                 2   600-V load center 1D     Auxiliary building El. 139'     No anchorage at rear of       Modify anchorage load center Q1R16B506-A                 2   600-V load center       Service water intake El.       Potential interaction from     Restrain 1 <12K                   188'-6"                       overhead light and loose       overhead light cable                         and cable Q1R16B507-B                 2   600-V load center       Service water intake El.       Potential interaction from     Restrain 1L2L                      188'-6"                       overhead light and cables in   overhead light panel                         and cables Q1R16B508-A                 2   600-V load center         Diesel generator building El. 1. Potential interaction from 1. Restrain 1R/2R                     155'                           overhead light and cabinet     overhead light
: 1. Potential interaction for
: 2. Inadequate anchorage       and cabinet and load path                 2. Modify anchorage Q1R16B509-B                 2   500-V load center         Diesel generator building El. 1. Potential interaction from 1. Restrain 1S/2S                     155'                           overhead light                 overhead light
: 1. Restrain local control panel 155' overhead light overhead light
: 2. Inadequate anchorage       2. Modify and load path                 anchorage Q1R17B001-A                 1   MCC 1A                   Auxiliary building El. 139'     Inadequate anchorage           Modify anchorage Page 3 of 5
: 2. Inadequate anchorage
: 2. Modify anchorage Q1H22L002-A 20 Transfer relay cabinet Auxiliary building El. 139' Panel not bolted to adjacent Bolt panel to 1
MCC adjacent MCC Q1 H22L503-B 20 Diesel local relay panel Diesel building El. 155' Potential interaction from Restrain 1B overhead light overhead light Q1H23S544B-B 20 Diesel generator room Diesel generator building El.
Potential interaction from Restrain 1 B HVAC LCS 155' overhead light overhead light Q1P16V579-B 7
B train service water Service water intake El.
Potential interaction for Restrain loose min-flow 188'-6" loose cables cables Q1 Ri 1 B503-A 4
LC transformer 1 R Diesel generator building El.
Potential bolt bending Resolved by 155' concern analysis Q1 R1 1B504-A 4
LC transformer 1K Service water intake El.
Potential bolt bending Resolved by 188'-6" concem analysis Q1 Ri 1 B505-B 4
LC transformer 1 L Service water intake El.
Bold spins under torque Repair bolt 188'-6" Q1 R11B507-B 4
LC transformer 1S Diesel generator building El.
Potential interaction from Restrain locker 155' locker Q1R15A503-A 3
4.16-kV switchgear 1H Diesel generator building El.
Potential interaction from Restrain 155' overhead light overhead light Q1R15A504-B 3
4.16-kv switchgear 1J Diesel generator building El.
Potential interaction from Restrain 155' overhead light and nearby overhead light, platform secure platform Q1R15A505-A 3
4.16-kv switchgear 1K Service water intake El.
Potential interaction from Restrain 188'-6" overhead light overhead light Q1R15A506-B 3
4.16-kv switchgear 1L Service water intake El.
Potential interaction from Restrain 188'-6" overhead light overhead light Q1R16B006-A 2
600-V load center 1D Auxiliary building El. 139' No anchorage at rear of Modify anchorage load center Q1R16B506-A 2
600-V load center Service water intake El.
Potential interaction from Restrain 1 <12K 188'-6" overhead light and loose overhead light cable and cable Q1R16B507-B 2
600-V load center Service water intake El.
Potential interaction from Restrain 1 L2L 188'-6" overhead light and cables in overhead light panel and cables Q1R16B508-A 2
600-V load center Diesel generator building El.
: 1. Potential interaction from
: 1. Restrain 1 R/2R 155' overhead light and cabinet overhead light
: 2. Inadequate anchorage and cabinet and load path
: 2. Modify anchorage Q1R16B509-B 2
500-V load center Diesel generator building El.
: 1. Potential interaction from
: 1. Restrain 1S/2S 155' overhead light overhead light
: 2. Inadequate anchorage
: 2. Modify and load path anchorage Q1R17B001-A 1
MCC 1A Auxiliary building El. 139' Inadequate anchorage Modify anchorage Page 3 of 5


ATTACHMENT 5: IPEEE VULNERABILITIES INFORMATION                                 NO. SNCF164-RPT-01, VERSION 2.0 Appendix H UNIT 1 Description of Equipment Outliers Equipment           Equipment Equipment                                               Description of                 Outlier ID Number           Class     Description             Plant Area                       Outlier                       Resolution Q1R17B002-B               1   MCC 1B                 Auxiliary building El. 121'     1. Inadequate anchorage in     1. Modify rear of MCC                   anchorage
ATTACHMENT 5: IPEEE VULNERABILITIES INFORMATION NO. SNCF164-RPT-01, VERSION 2.0 Appendix H UNIT 1 Description of Equipment Outliers Equipment Equipment Equipment Description of Outlier ID Number Class Description Plant Area Outlier Resolution Q1R17B002-B 1
: 2. Adjacent MCC bays and       2. Connect MCC transformer not connected     bays and transformer Q1R17B008-A                 1   MCC 1U                 Auxiliary building El. 139'     Adjacent panel and MCC         Connect panel to bays not adequately           MCC bays connected Q1R17B009-B                 1   MCC 1V                 Auxiliary building El. 139'     Adjacent MCC bays not         Connect MCC connected back to back         bays together Q1R17B504-A                 1   MCC 1K                   Service water intake El.       Potential bolt bending         Resolved by 188'-6"                         concern                       analysis Q1 R17B505-B               1   MCC 1L                   Service water intake El.       Potential bolt bending         Resolved by 188'-6"                         concern                       analysis QIR17B507-A                 1   MCC 1N                   Diesel generator building   El. Inadequate anchorage           Modify anchorage 155' Q1R17B508-B                 1   MCC 1P                   Diesel generator building   El. Inadequate anchorage           Modify anchorage 155' 01R17B509-A                 1   MCC iS                   Diesel generator building   El. Inadequate anchorage           Modify anchorage 155' QIR17B510-B                 1   MCC 1T                   Diesel generator building   El. 1. Potential interaction from 1. Restrain 155'                           nearby cabinet                 cabinet
MCC 1B Auxiliary building El. 121'
: 2. Inadequate anchorage       2. Modify anchorage Q1R36A511-B                 3   4.16 kV switchgear 1L    Diesel building El. 155'       Potential interaction from     Restrain cabinet surge arrestor                                           nearby cabinet QSH 1lNGEPB2508-AB         20   Emergency power         Auxiliary building El. 155'     Potential interaction from     Restrain board                                                   overhead light                 overhead light QSH21 E525-A               20   Diesel generator 1-2A   Diesel generator building El. 1. Potential interaction from 1. Restrain local                   155'                           overhead light                 overhead light
: 1. Inadequate anchorage in
: 2. Bolts missing at cabinet   2. Install missing support                       bolts
: 1. Modify rear of MCC anchorage
: 3. Gaps under panel           3. Provide grout under panel QSH21 E528-A               20   Diesel generator 1C     Diesel generator building El. 1. Potential interaction from 1. Restrain local control panel     155'                           overhead light                 overhead light
: 2. Adjacent MCC bays and
: 2. Gaps under panel           2. Provide grout under panel QSH22L502-A               20   Diesel generator relay   Diesel generator building El. 1. Potential interaction from 1. Restrain panel 1-2A               155'                           overhead light                 overhead light
: 2. Connect MCC transformer not connected bays and transformer Q1R17B008-A 1
: 2. Missing anchor bolt         2. Replace missing bolt QSH22L504-A               20   Diesel generator relay   Diesel generator building El. 1. Potential interaction from 1. Restrain panel 1C                 155'                           overhead light                 overhead light
MCC 1U Auxiliary building El. 139' Adjacent panel and MCC Connect panel to bays not adequately MCC bays connected Q1R17B009-B 1
: 2. Interaction from Internal   2. Repair cover cover on relays               on relays QSH23S544E-A             20   Diesel generator room   Diesel generator building El. Potential interaction from     Restrain 1-2A HVAC               155'                           overhead light                 overhead light Page 4 of 5
MCC 1V Auxiliary building El. 139' Adjacent MCC bays not Connect MCC connected back to back bays together Q1R17B504-A 1
MCC 1K Service water intake El.
Potential bolt bending Resolved by 188'-6" concern analysis Q1 R17B505-B 1
MCC 1L Service water intake El.
Potential bolt bending Resolved by 188'-6" concern analysis QIR17B507-A 1
MCC 1N Diesel generator building El.
Inadequate anchorage Modify anchorage 155' Q1R17B508-B 1
MCC 1P Diesel generator building El.
Inadequate anchorage Modify anchorage 155' 01R17B509-A 1
MCC iS Diesel generator building El.
Inadequate anchorage Modify anchorage 155' QIR17B510-B 1
MCC 1T Diesel generator building El.
: 1. Potential interaction from
: 1. Restrain 155' nearby cabinet cabinet
: 2. Inadequate anchorage
: 2. Modify anchorage Q1R36A511-B 3
4.16 kV switchgear 1 L Diesel building El. 155' Potential interaction from Restrain cabinet surge arrestor nearby cabinet QSH 1lNGEPB2508-AB 20 Emergency power Auxiliary building El. 155' Potential interaction from Restrain board overhead light overhead light QSH21 E525-A 20 Diesel generator 1-2A Diesel generator building El.
: 1. Potential interaction from
: 1. Restrain local 155' overhead light overhead light
: 2. Bolts missing at cabinet
: 2. Install missing support bolts
: 3. Gaps under panel
: 3. Provide grout under panel QSH21 E528-A 20 Diesel generator 1C Diesel generator building El.
: 1. Potential interaction from
: 1. Restrain local control panel 155' overhead light overhead light
: 2. Gaps under panel
: 2. Provide grout under panel QSH22L502-A 20 Diesel generator relay Diesel generator building El.
: 1. Potential interaction from
: 1. Restrain panel 1-2A 155' overhead light overhead light
: 2. Missing anchor bolt
: 2. Replace missing bolt QSH22L504-A 20 Diesel generator relay Diesel generator building El.
: 1. Potential interaction from
: 1. Restrain panel 1C 155' overhead light overhead light
: 2. Interaction from Internal
: 2. Repair cover cover on relays on relays QSH23S544E-A 20 Diesel generator room Diesel generator building El.
Potential interaction from Restrain 1-2A HVAC 155' overhead light overhead light Page 4 of 5


ATTACHMENT 5: IPEEE VULNERABILITIES INFORMATION                               NO. SNCF164-RPT-01, VERSION 2.0 Appendix H UNIT 1 Description of Equipment Outliers Equipment           Equipment Equipment                                             Description of               Outlier ID Number           Class     Description             Plant Area                   Outlier                       Resolution QSR17B006-A               1   MCC 1F                   Auxiliary building El. 155'   Inadequate anchorage and     Modify anchorage potential interaction from   (top brace to wall) adjacent wall QSR17BO07-B               1   MCC IG                   Auxiliary building El. 155'   Inadequate anchorage and     Modify anchorage potential interaction from   (top brace to wall) adiacent wall QSR42B523A-A             15   125-V-DC service         Service water intake El.     Potential bolt bending       Resolved by water building battery   188'-6"                       concern                       analysis No. 1 QSR42B523B-A             15   125-V-DC service         Service water intake El.     Potential bolt bending       Resolved by water building battery   188'-6"                       concern                       analysis No. 2 QSR42B523C-B             15   125-V-DC service         Service water intake El.     Potential bolt bending       Resolved by water building battery   188'-6"                       concern                       analysis No. 3 QSR42B523D-B             15   125-V-DC service         Service water intake El.     Potential bolt bending       Resolved by water building battery   188'-6"                       concern                       analysis No. 4 QSR42B526B-A             16   Service water building   Service water intake El.     Potential interaction from   Restrain ladder battery charger No. 2   188'-6"                       ladder and cart               and cart (standby)
ATTACHMENT 5: IPEEE VULNERABILITIES INFORMATION NO. SNCF164-RPT-01, VERSION 2.0 Appendix H UNIT 1 Description of Equipment Outliers Equipment Equipment Equipment Description of Outlier ID Number Class Description Plant Area Outlier Resolution QSR17B006-A 1
QSR43A501-A               17   Diesel generator 1-2A   Diesel generator building El. 1. Potential interaction from 1. Restrain (skid)                   155'                         overhead light               overhead light
MCC 1F Auxiliary building El. 155' Inadequate anchorage and Modify anchorage potential interaction from (top brace to wall) adjacent wall QSR17BO07-B 1
: 2. Potential interaction from 2. Secure hoist hoist chain                   chain QSR43A503-A               17   Diesel generator 1C     Diesel generator building El. 1. Potential interaction from 1. Restrain (skid)                   155'                         overhead light               overhead light
MCC IG Auxiliary building El. 155' Inadequate anchorage and Modify anchorage potential interaction from (top brace to wall) adiacent wall QSR42B523A-A 15 125-V-DC service Service water intake El.
: 2. Potential interaction from 2. Secure hoist hoist chain                   chain QSR43L001A-A             20   Diesel generator 1-2A   Diesel generator building El. Potential interaction from   Restrain DC control PWR auto     155'                         overhead light               overhead light XFER SW (ATS)           III_                                                                             I QSR43L001C-A             20   Diesel generator 1-C     Diesel generator building El. Potential interaction from   Restrain DC control PWR auto     155'                         overhead light               overhead light
Potential bolt bending Resolved by water building battery 188'-6" concern analysis No. 1 QSR42B523B-A 15 125-V-DC service Service water intake El.
_XFER (ATS)                                                                                           I
Potential bolt bending Resolved by water building battery 188'-6" concern analysis No. 2 QSR42B523C-B 15 125-V-DC service Service water intake El.
                *This document has been re-typed from the IPEEE Vulnerabilities Appendix H.
Potential bolt bending Resolved by water building battery 188'-6" concern analysis No. 3 QSR42B523D-B 15 125-V-DC service Service water intake El.
Potential bolt bending Resolved by water building battery 188'-6" concern analysis No. 4 QSR42B526B-A 16 Service water building Service water intake El.
Potential interaction from Restrain ladder battery charger No. 2 188'-6" ladder and cart and cart (standby)
QSR43A501-A 17 Diesel generator 1-2A Diesel generator building El.
: 1. Potential interaction from
: 1. Restrain (skid) 155' overhead light overhead light
: 2. Potential interaction from
: 2. Secure hoist hoist chain chain QSR43A503-A 17 Diesel generator 1C Diesel generator building El.
: 1. Potential interaction from
: 1. Restrain (skid) 155' overhead light overhead light
: 2. Potential interaction from
: 2. Secure hoist hoist chain chain QSR43L001A-A 20 Diesel generator 1-2A Diesel generator building El.
Potential interaction from Restrain DC control PWR auto 155' overhead light overhead light XFER SW (ATS)
III_
I QSR43L001C-A 20 Diesel generator 1-C Diesel generator building El.
Potential interaction from Restrain DC control PWR auto 155' overhead light overhead light
_XFER (ATS)
I
*This document has been re-typed from the IPEEE Vulnerabilities Appendix H.
Page 5 of 5
Page 5 of 5


ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS   NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6 UNIT 1 - SEISMIC WALKDOWN ENGINEER CERTIFICATIONS (Version 1.0 and Version 2.0)
ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6 UNIT 1 - SEISMIC WALKDOWN ENGINEER CERTIFICATIONS (Version 1.0 and Version 2.0)
NO. SNCF164-RPT-01 Page 1 of 21
NO. SNCF164-RPT-01 Page 1 of 21


ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS                                       NO. SNCF164-RPT-01, VERSION 2.0
ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 t
                                                                                        - *.:, .-                t 0ENERCON Excellence-Every project.Everyday*
0ENERCON Excellence-Every project. Everyday*
Certificate of Completion is hereby granted to Nikole Arrant for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDOWNS Awarded: 2/27/2013 at Farley Nuclear Plant i             - "                ~Kenneth Whitmore                                           ..
Certificate of Completion is hereby granted to Nikole Arrant for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDOWNS Awarded: 2/27/2013 at Farley Nuclear Plant i  
Certified Seismic Walkdown Engineer Alexandria, VA - 6/20/2012 Page 2 of 21
~Kenneth Whitmore Certified Seismic Walkdown Engineer Alexandria, VA - 6/20/2012 Page 2 of 21


NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS Robert W. Ashworth Page 3 of 21
ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 Robert W. Ashworth Page 3 of 21


NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS t.I               ,ELECTRICPOWER Erma       I   RESEARCH INSTITUTE Certificateof Completion Robert W. Ashworth Training on Near Term Task Force Recommendation 2.3 - Plant Seismic Walkdowns July 3, 2012 Date                   Caroline S. ScNaseman, P.E.
NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS t.I  
,ELECTRIC POWER Erma I RESEARCH INSTITUTE Certificate of Completion Robert W. Ashworth Training on Near Term Task Force Recommendation 2.3 - Plant Seismic Walkdowns July 3, 2012 Date Caroline S. ScNaseman, P.E.
Instructor Page 4 of 21
Instructor Page 4 of 21


NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS Page 5 of 21
ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 Page 5 of 21


NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS F.3 ENERCON f xcellenc8-Every P!'006! [. cvry 5,7v Certificate of Completion is hereby granted to Maggie Farah for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDOWNS Awarded: 7/26/2012 in Mt Arlington, NJ Kenneth Whitmore Certified Seismic Walkdown Engineer Alexandria, VA - 6/20/2012 Page 6 of 21
NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS F.3 ENERCON f xcellenc 8-Every P!'006! [. cvry 5,7v Certificate of Completion is hereby granted to Maggie Farah for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDOWNS Awarded: 7/26/2012 in Mt Arlington, NJ Kenneth Whitmore Certified Seismic Walkdown Engineer Alexandria, VA - 6/20/2012 Page 6 of 21


ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS                                               NO. SNCF164-RPT-01, VERSION 2.0 11I11 1.-.~
ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 11I11 1.-.~
REILARCH INSTITUTE Certificateof Completion Ryan Harlos Training on Near Term Task Force Recommendation 2.3
REI LARCH INSTITUTE Certificateof Completion Ryan Harlos Training on Near Term Task Force Recommendation 2.3
                                  - Plant Seismic Walkdowns June 21, 2012 Date                           RobedtK. Kanawm EPRI Manage, Structmlu Reliahkty & hftsgrity Page 7 of 21
- Plant Seismic Walkdowns June 21, 2012 Date Robedt K. Kanawm EPRI Manage, Structmlu Reliahkty & hftsgrity Page 7 of 21


NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS C-FO~alIRSEAR*Cf INSTITUTE Certificate of Completion Crystal Lovelady Training on Near Term Task Force Recommendation 2.3
ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 C-FO~alIRSEAR*Cf INSTITUTE Certificate of Completion Crystal Lovelady Training on Near Term Task Force Recommendation 2.3
                                  - Plant Seismic Walkdowns June 13,2012 Date                           Robedt K-Kassawar EPRI Manager, Structixal Reliability & Integrity Page 8 of 21
- Plant Seismic Walkdowns June 13,2012 Date Robedt K -Kassawar EPRI Manager, Structixal Reliability & Integrity Page 8 of 21


ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS           NO. SNCF164-RPT-01, VERSION 2.0 Certificate of Completion This certifies that Crystal R Lovelady Has successfully completed SAM NTTF 2.3 Seismic Walkdown Engineer JFG Completed On 8/18/2012 03:00 PM America/Chicago Page 9 of 21
ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 Certificate of Completion This certifies that Crystal R Lovelady Has successfully completed SAM NTTF 2.3 Seismic Walkdown Engineer JFG Completed On 8/18/2012 03:00 PM America/Chicago Page 9 of 21


ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS                                     NO. SNCF164-RPT-01, VERSION 2.0
ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0
                                            ~iENERCON Excellence-Evety project Every day.
~iENERCON Excellence-Evety project Every day.
Certificate of Completion is hereby granted to Laura Maclay for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3
Certificate of Completion is hereby granted to Laura Maclay for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDO WNS Awarded: 7/26/2012 in Mt. Arlington, NJ Kenneth Whitmore Certified Seismic Walkdown Engineer Alexandria, VA - 6/20/2012 Page 10 of 21
                .                  PLANT SEISMIC WALKDO WNS Awarded: 7/26/2012 in Mt. Arlington, NJ Kenneth Whitmore Certified Seismic Walkdown Engineer Alexandria, VA - 6/20/2012 Page 10 of 21


NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS Page 11 of 21
ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 Page 11 of 21


NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS 6~I ia~iii~ii (~I~   (~ I~   f~% ttai   Mu t1~ i~ '4~1 'flu' Mfl ftau t4~' tI~1 utai ifluu tt&~ I~ t~ I~i ia~ IAn I&~1
NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS 6~I ia~iii~ii (~I~ (~
        ~\V~fMMMMMMMMMMMMM~
I~ f~% ttai Mu t1~ i~  
Ii EPRI Oft        Qgcrtifirattc                              uf Electric Power Arliicucmctrt Research Institute Q4isiiz Io (Grrtifjg itat ft-                                          nut       A. *iktus Iras Tompletrb tt~
'4~1 'flu' Mfl ftau t4~' tI~1 utai ifluu tt&~ I~
                      &sect;rismir .39 Abb-On Tgraining Taou rs r N*rlb '&#xfd;uUt 27-29, 1992 David A. Freed, MPR Associates SQUG Training Coordinator
t~ I~i ia~ IAn I&~1
                                                                                              &#xfd;1&#xfd;1 6ntt--&#xfd; Robert P. Kassawara, EPRI SQUG Program Manager
~\\V~fMMMMMMMMMMMMM~
                                                                                                    -            -                'I I
Oft ft-Ii EPRI Electric Power Research Institute Qgcrtifirattc uf Arliicucmctrt Q4isi iz Io (Grrtifjg itat nut A. *iktus Iras Tompletrb tt~
                                                                                                ~JhIIAIL                               p Page 12 of 21
&sect;rismir.39 Abb-On Tgraining Taou rs r N*rlb  
'&#xfd;uUt 27-29, 1992 I
David A. Freed, MPR Associates SQUG Training Coordinator
&#xfd;1&#xfd;1 6ntt--&#xfd; Robert P. Kassawara, EPRI SQUG Program Manager
'I
~JhIIAIL p
Page 12 of 21


NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS Page 13 of 21
ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 Page 13 of 21


NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS E3 ENERCON Excellence-Every project. Every day.
NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS E3 ENERCON Excellence-Every project. Every day.
Certificate of Completion is hereby granted to Terry (Alan) Mullenix for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDOWNS Awarded: 7/11/2012 in Kennesaw, GA
Certificate of Completion is hereby granted to Terry (Alan) Mullenix for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDOWNS Awarded: 7/11/2012 in Kennesaw, GA
                                      /Kevin Bessell                             -7         &#xfd;         ~lehWhitmore Certified Seismic Walkdown Engineer                               Certified Seismic Walkdown Engineer Palo Alto, CA - 6/13/2012                                       Alexandria, VA - 6/20/2012 Page 14 of 21
/Kevin Bessell  
-7  
&#xfd;  
~lehWhitmore Certified Seismic Walkdown Engineer Certified Seismic Walkdown Engineer Palo Alto, CA - 6/13/2012 Alexandria, VA - 6/20/2012 Page 14 of 21


ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS                                       NO. SNCF164-RPT-01, VERSION 2.0 qf
ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 qf OENERCON Excellence-Every project. Every day, Certificate of Completion is hereby granted to Brian Nelson for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDOWNS Awarded: 2/27/2013 at Farley Nuclear Plant
                    -<:                    OENERCON Excellence-Every project.Every day, Certificate of Completion is hereby granted to Brian Nelson for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDOWNS Awarded: 2/27/2013 at Farley Nuclear Plant
/
                                          /   *
Kenneth Whitmore Certified Seismic Walkdown Engineer Alexandria, VA - 6/20/2012 Page 15 of 21
* Kenneth Whitmore Certified Seismic Walkdown Engineer Alexandria, VA - 6/20/2012 Page 15 of 21


ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS             NO. SNCF164-RPT-01, VERSION 2.0 Page 16 of 21
ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 Page 16 of 21


ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS                                           NO. SNCF164-RPT-01, VERSION 2.0
ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0
                                                  ~II2i
'Ii
      'Ii Certificateof Completion Kenneth Whitmore Training on Near Term Task Force Recommendation 2.3
~II2i Certificateof Completion Kenneth Whitmore Training on Near Term Task Force Recommendation 2.3
                                - Plant Seismic Walkdowns June 21, 2012               IfAOk 44a4oa Date                          Robert K.'Kaeaware EPRI Maneger.
- Plant Seismic Walkdowns June 21, 2012 Date IfAOk 44a4oa Robert K.' Kaeaware EPRI Maneger.
Strudaaul Reabb~y & kftgrity Page 17 of 21
Strudaaul Reabb~y & kftgrity Page 17 of 21


NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS rlEl QUGow~
NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS lrEl QUGow~
Presentsthis Certfif'cati of}Achievement To Certify Tiat i   -     e ilwiUw4j nt has Compltedthe SQVG Wafkdown Screening L.1           jUii]&#xa3; J
Certfif'cati Presents this of}Achievement To Certify Tiat i-e nt L.1 ilwiUw4j jUii]&#xa3; J
andSeismic Evaluation TrainingCourse Held qprif6,h - 101h, 1992 _
has Complted the SQVG Wafkdown Screening andSeismic Evaluation Training Course Held qprif 6,h - 101h, 1992  
                        -V*,
-V*,
Neil P.Smith. Commionwealth Ediuon SQUG Chamnn David A. Freed, MPR Associates SQUG Training Coordinator Robert P. KassuwamaEPR SQUG Progrnil Mulagu Ul Page 18 of 21
David A. Freed, MPR Associates SQUG Training Coordinator Neil P. Smith. Commionwealth Ediuon SQUG Chamnn Robert P. Kassuwama EPR SQUG Progrnil Mulagu Ul Page 18 of 21


NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS CertfateofAchievement This is to Certify that Kenneth L.Whitmore has Competedthe ERIgAdd-On Seismic IEEE Training Course Hlel7d7ovember2nd through 4 thi, 1992 David A. Freed, MPR Associates             Robert P. Kasawara, EPRI Training Coordinator                       Pwgrant Manager Page 19 of 21
ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 Certfate of Achievement This is to Certify that Kenneth L. Whitmore has Competed the ERIgAdd-On Seismic IEEE Training Course Hlel7d7ovember 2nd through 4 thi, 1992 David A. Freed, MPR Associates Robert P. Kasawara, EPRI Training Coordinator Pwgrant Manager Page 19 of 21


NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS I2I*I EI.1CRic POWER RESITAICHINSTITUTE Certificateof Completion Taylor Youngblood Training on Near Term Task Force Recommendation 2.3
ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 I2I*I EI.1CRic POWER RESITAICH INSTITUTE Certificate of Completion Taylor Youngblood Training on Near Term Task Force Recommendation 2.3
                                  - Plant Seismic Walkdowns July 11, 2012 Date                             Pabert K. Kusaw~a EM~ Mmgar Structuwa RA~bbty & kftglty Page 20 of 21
- Plant Seismic Walkdowns July 11, 2012 Date Pabert K. Kusaw~a EM~ Mmgar Structuwa RA~bbty & kftglty Page 20 of 21


NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS F#3 ENERCON ExCCf'PCC-e Every proje.'ct Every oay.
NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS F#3 ENERCON ExCCf'PCC-e Every proje.'c t Every oay.
Certificate of Completion is hereby granted to Steve Yuan for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDOWNS Awarded: 7/26/2012 in Mt. Arlington, NJ
Certificate of Completion is hereby granted to Steve Yuan for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDOWNS Awarded: 7/26/2012 in Mt. Arlington, NJ
                                            '--"'f!Ke         t Whitmore Certified Seismic Walkdown Engineer Alexandria, VA - 6/20/2012 Page 21 of 21}}
'--"'f!Ke t Whitmore Certified Seismic Walkdown Engineer Alexandria, VA - 6/20/2012 Page 21 of 21}}

Latest revision as of 22:45, 10 January 2025

Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 543 of 562 Through Attachment 6
ML14071A077
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/20/2014
From:
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
NL-14-0249
Download: ML14071A077 (46)


Text

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 r-Z-

Seismic Walkdown Checklist (SWC)

Equipment ID No. QIG31HOOO1A Equip. Class Sheet j g f A'

Status: Y2ý'NE-I U["I

_° Equipment Description SPENT FUEL HEAT EXCHANGER 1A Location: Bldg. AUXILIARY Floor El. 155 Room, Area

,446',

Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

/-

b 7 6548

//-

A

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y ND UD N/AD V

ND UliD N/AD YkND UD N/AD Y2ND UO N/AD YpNO Ut-Enter the equipment class name from Appendix B: Classes of Equipment.

Page 543 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0

-rl - Q) g-1 Sheet Status: Y'k U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. QIG31HOOOIA Equip. Class, 21 Equipment Description SPENT FUEL_ HE T EXCHANGER 1A Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Y ND 5U0 N/ADI "0

N/AD "NOD N/AD Y8 uD Other Adverse Conditions 7

I1. Have you looked for and found no other seismic conditions that could Y[V - UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) 19,

-iv t7W ILLA Evaluated by:

cA Date: 2, /1Z4Oz V9-

'i-Q

-I---

Page 544 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0

-n dn Page 545 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 546 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 AI-Sheet: 'of 3 Status: YZ;* NC] UF-'

V Seismic Walkdown Checklist (SWC)

Equipment ID No. 01G31P0028 Equip. Class' 5 Equipment Description 1B SFP PUMP Location: Bldg. AUXILIARY Floor El. 139 Room, Area 14 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions maybe used to record the results ofjudgments and findings. Additional space is provided at the end of this cfecklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YQJNO P-1 -j' 1AS7&S6 oc., t, -, -ý 6

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YO/NO UC N/AC YVC UC-- N/AO Y1413~ LJO N/AC AYN/;"

UC N/AC YA 0NO UC IEnter the equipment class name from Appendix B: Classes of Equipment.

Page 547 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 r I 50a Sheet 2 of 3 Status: YI*f NEI uE-1 Seismic Walkdown Checklist (SWC)

Equipment ID No. Q1G31PO02B Equip. Classý Equipment Description 1B SFP PUMP Interaction ffects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Y4*

UQ N/A0 Y~r/0UL N/Al]

YVN/

UED N/A[3 Other Adverse Conditions

/

11, Have you looked for and found no other seismic conditions that could YV/No UE' adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

NO&,V 4~:6Ai WAIA I I.. FAJ"4, Evaluated by:

Date:

____z

______1 IQ C i-f Page 548 of 562

k1cocinki 1) n ATTACHMENT 3: SEISMIC WALKDOW N CHECKLISTS Nu. S r

,o1.-rxr

,-0 v,

i4 N 41 Page 549 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 F [5Wz.-3 Seismic Walkdown Checklist (SWC)

Equipment ID No. OIG31VOOIA Equip. Class, 0 Sheetlof 3 Status: Y;iN[] U[]

U Equipment Description 1A SFP PUMP SUCTION ISO Location: Bldg. AUXILIARY Floor El. 139 Room, Area

- 4 2, Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoraue

1. Is the anchorage configuration verification required (i.e., is the item one YO N of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidaiion?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YO] NO] U[- N/Am-YO] NO UE] N/A[ý--

YE] NEI UE' N/A&

YE] NEI UE] N/A[2---'-

Yi/OUE I Enter the equipment class name from Appendix B: Classes of Equipment, Page 550 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Seismic Walkdown Checklist (SWC)

Equipment ID No. QIG31VOOIA Equip. Class, 0 Equipment Description 1A SFP PUMP SUCTION ISO Sheet 2 of 3 Status: YYd U0[]

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YLý1] U0 N/AQ VdlNo UU-N/AQ YE-N UMI N/AE Ya U0 Other Adverse Conditions 7

11. Have you looked for and found no other seismic conditions that could Y*NO U[

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

~ 44

~M.A55, 00-4~

kutL Evaluated by:

,i"-/42ý Date:

/4 2-.

((ceAv~

Ii Page 551 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 552 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 I',

r 1 5 V7 -

Sheettu ofJ3 Status: Y Nn] UE]

Seismic Walkdown Checklist (SWC)

Equipment ID No. QIG31VOO3B Equip. Class, 0 Equipment Description 1B SFPHXOUTLETISO Location: Bldg. AUXILIARY Floor EL 155 Rooa Manufacturer, Model, Etc. (optional but recommended)

.d~ ;,

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchora2e

1. Is the anchorage configuration verification required (i.e., is the item one YE] N$/

of the 50%/a of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

YE] NO] UE] NiAb/

/A/-

L/Ale

3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YEI NEI UE N/AdLPý

4. Is the anchorage free of visible cracks in the concrete near the anchors?

YE] NE] U17] NIh' YE] NEI UE] N/A

5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

/9-LIgt (e-'i /~/Ai YtrNCI E]

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Fnter the equipment class name from Appendix B: Classes of Equipment Page 553 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 of 3 Status: YCN-U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. QIG31VO03B Equip. Class' Equipment Description 1B SFP HX OUTLET ISO Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Y JU-N/AE]

Y ND ULJ N/AD l4NE-UM N/AD

  • f'ND UD1 Other.Adverse Conditions
11. Have you looked for and found no other seismic conditions that could xZ'iN3 UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated'a" by:X Dae:2/,X2..

Evaluated by:

Dae: 2-Y1'y - _ 2 Page 554 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 I

Page 555 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet i ofr4,.*

Status: Y["'DUE I

Seismic Walkdown Checklist (SWC)

Equipment ID No. QIG31VOO4A Equip. Class, Equipment Description 1A SFP COOLING LOOP TO SFP PURIF INLET ISO Location: Bldg. AUXILIARY Floor El. 139 Room, Area

-- t,-

Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoraf

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YD NO--

YIO NO UCN/Ab"*

YO NO UO N/A&d'f

4. Is the anchorage free of visible cracks in the concrete near the anchors?

YF' NO UO N/A

5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YO NO UO NALJO NOUO I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 556 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet20 f :9 4,4, Status: Y[ee[--f UM-]

Seismic Walkdown Checklist (SWC)

Equipment lD No. QG31VOO4A Equip. Class, 0 Equipment Description 1A SFP COOLING LOOP TO SFP PURIF INLET ISO Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

Y(Ž I-] UE] NiA[-]

Are overhead equipment, distribution systems, ceiling tiles and lighting, 4if)l UIE" N/AD

~

and masonry block walls not likely to collapse onto the equipment?

9. Do attaled lines have adequate flexibility to avoid damage?

")J*

1-] U[ N/AD3 w,14A), -771 Ai Y

10. Based on the above seismic interaction evaluations, is equipment free YtrNO UO of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could A

N< -

U-i adversely affect the safety functions of the equipment?

Comments (Additional pages may be added' as necessary)

Evaluated by:

Ziz&4&

Evaluated bv:

Date:

//.

? W2

'ý(/ li.

Page 557 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 558 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 rm Page 559 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 F( 15tvz-4 Seismic Walkdown Checklist (SWC)

Equipment ID No. Q1G3 IVOO Equip. Class' 0 Equipment Description SFE COOLING LOOP RETURN (KEY Z-225)

Sheetf 3 Status: YON[O U[

i Location: Bldg. AUXILIARY Floor El. 139 Room, Area Q.L3tA.A Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is them one of the 50% of SWEL items requiring such verification)?

YO Nf

2. Is the anchorage free of bent, broken, missing or loose hardware?

4V1 L- /i&

Ce) MPa /j1

3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YO NO UO YO NO UO N/An.-

4. Is the anchorage free of visible cracks in the concrete near the anchors?

YO NO UIO N/A&;--

5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YO NO UQ NIA&-"

lb'NO UO IEnter the equipment class name from Appendix B: Classes of Equipment Page 560 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 of 3 Status: YIrNc' umI Seismic Walkdown Checklist (SWC)

Equipment ID No. Q1G31VO06 Equip. Class' 0 Equipment Description SFP COOLING LOOP RETURN (MEY Z-225)

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Ytd UD N/AD

&NO UO N/AD Y(3 40 U[O N/AD Y[BN-UD Other Adverse Conditions

11. Hlave you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

5T.rP-r.,

11-S

/"A"J7 vteAY YlM-ND U[D Comments (Additional pages may be added as necessary)

Evaluated by:

,,&2

//~L~

Date:

7./f. 2',,-.

Page 561 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 562 of 562

ATTACHMENT 5: IPEEE VULNERABILITIES INFORMATION NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 5 UNIT 1 - IPEEE VULNERABILITIES INFORMATION (Version 1.0 and Version 2.0)

NO. SNCF164-RPT-01 This attachment contains Appendix H from the report entitled, "Joseph M. Farley Nuclear Plant, Unit 1 and Unit 2, Individual Plant Examination of External Events - Seismic" Page 1 of 5

ATTACHMENT 5: IPEEE VULNERABILITIES INFORMATION NO. SNCF164-RPT-01, VERSION 2.0 Appendix H UNIT 1 Description of Equipment Outliers Equipment Equipment Equipment Description of Outler ID Number Class Description Plant Area Outlier Resolution AITB0O4 20 Terminal Box Auxiliary Building El. 100' Internal wire may impact Restrain wire essential relay NiH11NGMCB250OA-AB 20 Main control board Auxiliary Building El. 155' Potential Interaction with Restrain Sect A overhead light overhead light QICIiEOO4A-AB 2

Reactor trip switchgear Auxiliary Building El. 121' Panels not bolted together Bolt to adjacent No. 1 panel QIC11E0O4B-AB 2

Reactor trip switchgear Auxiliary Building El. 121' Panels not bolted together Bolt to adjacent No. 2 panel Q0C22LT0485-P2 18 Steam generator I B Containment building El.

Wre exposed from Repair conduit narrow range level 155' disconnected flex conduit QIE16H003B-B 10 RHR pump room Auxiliary building El. 83' Bolts attaching coil to frame Install missing cooler 1A are missing.

bolts QIF16LT0501-A 18 RWST level transmitter Yard El. 155' Anchor bolts are corroded Replace anchor bolts QIF16LT0502-B 18 RWST level transmitter Yard El. 155' Anchor bolts are corroded Replace anchor bolts Q1H11NGASC2506C-B 20 Aux safeguards Auxiliary building El. 155'

1. Potential Interaction from
1. Restrain cabinet C overhead light overhead light
2. Potential interaction from
2. Bolt panels panels QSH 11NGR2504, together QAH11NGH2514-AB, and QlH1lNGSS2504 Qi H11NGASC2506D-A 20 Aux safeguards Auxiliary building El. 155' Potential interaction from Restrain cabinet D overhead light overhead light Q1 HiiNGB2504J-A 20 BOP instrumentation Auxiliary building El. 155' Potential interaction from Restrain cabinet J overhead light overhead light Q1 H11NGB2504K-B 20 BOP instrumentation Auxiliary building El. 155' Potential interaction from Restrain cabinet K overhead light overhead light Qi H11NGCCM2523A-A 20 ICCMS processor Auxiliary building El. 155' Potential interaction from Restrain cabinet train A overhead light overhead light Q1H 11NGCCM2523B-B 20 ICCMS processor Auxiliary building El. 155' Potential interaction from Restrain cabinet train B overhead light overhead light Q1 H11NGNIS2503A-1 20 NIS excore detector Auxiliary building El. 155' Potential interaction from Restrain cabinet overhead light overhead light QlHllNGR25041-AB 20 Radiation monitor Auxiliary building El. 155' Potential interaction from Restrain panel overhead light overhead light Q1H11NGSSP2506G-B 20 Solid-state protection Auxiliary building El. 155'
1. Potential Interaction from
1. Restrain input cabinet overhead light overhead light
2. Potential interaction from
2. Bolt panels panels together NiH11NGMIM2515-N and NlHllNGRYL25060-AB QIH 11NGSSP2505J-B 20 Solid-state protection Auxiliary building El. 155' Potential interaction from Restrain input cabinet overhead light overhead light Q1 H11NGSSP2506K-A 20 Solid-state protection Auxiliary building El. 155' Potential interaction from Restrain input cabinet overhead light overhead light Q1 H11NGSSP2506N-A 20 Solid-state protection Auxiliary building El. 155' Potential interaction from Restrain input cabinet overhead light overhead light Q1 H21E505-B 20 4.16-kv switchgear 1J Diesel generator building El. Potential interaction from Restrain local control panel 155' overhead light, fan and overhead light, adjacent conduit fan and conduit A1TBOO4 20 Terminal Box Auxiliary Building El. 100' Internal wire may impact Restrain wire essential relay NiH lINGMCB250OA-AB 20 Main control board Auxiliary Building El. 155' Potential Interaction with Restrain

_______________ISect A

overhead light overhead light Page 2 of 5

ATTACHMENT 5: IPEEE VULNERABILITIES INFORMATION NO. SNCF164-RPT-01, VERSION 2.0 Appendix H UNIT 1 Description of Equipment Outliers Equipment Equipment Equipment Description of Outlier ID Number Class Description Plant Area Outlier Resolution Q1 H21E506-A 20 4.16-kv switchgear 1K Service water intake Potential interaction from Restrain local control panel structure El. 188'-6" overhead light overhead light Q1 H21E507-B 20 4.16-kv switchgear 1L Service water intake Potential interaction from Restrain local control panel structure El. 188'-6" overhead light overhead light Q1 H21 E527-B 20 Diesel generator 1 B Diesel generator building El.

1. Potential interaction for
1. Restrain local control panel 155' overhead light overhead light
2. Inadequate anchorage
2. Modify anchorage Q1H22L002-A 20 Transfer relay cabinet Auxiliary building El. 139' Panel not bolted to adjacent Bolt panel to 1

MCC adjacent MCC Q1 H22L503-B 20 Diesel local relay panel Diesel building El. 155' Potential interaction from Restrain 1B overhead light overhead light Q1H23S544B-B 20 Diesel generator room Diesel generator building El.

Potential interaction from Restrain 1 B HVAC LCS 155' overhead light overhead light Q1P16V579-B 7

B train service water Service water intake El.

Potential interaction for Restrain loose min-flow 188'-6" loose cables cables Q1 Ri 1 B503-A 4

LC transformer 1 R Diesel generator building El.

Potential bolt bending Resolved by 155' concern analysis Q1 R1 1B504-A 4

LC transformer 1K Service water intake El.

Potential bolt bending Resolved by 188'-6" concem analysis Q1 Ri 1 B505-B 4

LC transformer 1 L Service water intake El.

Bold spins under torque Repair bolt 188'-6" Q1 R11B507-B 4

LC transformer 1S Diesel generator building El.

Potential interaction from Restrain locker 155' locker Q1R15A503-A 3

4.16-kV switchgear 1H Diesel generator building El.

Potential interaction from Restrain 155' overhead light overhead light Q1R15A504-B 3

4.16-kv switchgear 1J Diesel generator building El.

Potential interaction from Restrain 155' overhead light and nearby overhead light, platform secure platform Q1R15A505-A 3

4.16-kv switchgear 1K Service water intake El.

Potential interaction from Restrain 188'-6" overhead light overhead light Q1R15A506-B 3

4.16-kv switchgear 1L Service water intake El.

Potential interaction from Restrain 188'-6" overhead light overhead light Q1R16B006-A 2

600-V load center 1D Auxiliary building El. 139' No anchorage at rear of Modify anchorage load center Q1R16B506-A 2

600-V load center Service water intake El.

Potential interaction from Restrain 1 <12K 188'-6" overhead light and loose overhead light cable and cable Q1R16B507-B 2

600-V load center Service water intake El.

Potential interaction from Restrain 1 L2L 188'-6" overhead light and cables in overhead light panel and cables Q1R16B508-A 2

600-V load center Diesel generator building El.

1. Potential interaction from
1. Restrain 1 R/2R 155' overhead light and cabinet overhead light
2. Inadequate anchorage and cabinet and load path
2. Modify anchorage Q1R16B509-B 2

500-V load center Diesel generator building El.

1. Potential interaction from
1. Restrain 1S/2S 155' overhead light overhead light
2. Inadequate anchorage
2. Modify and load path anchorage Q1R17B001-A 1

MCC 1A Auxiliary building El. 139' Inadequate anchorage Modify anchorage Page 3 of 5

ATTACHMENT 5: IPEEE VULNERABILITIES INFORMATION NO. SNCF164-RPT-01, VERSION 2.0 Appendix H UNIT 1 Description of Equipment Outliers Equipment Equipment Equipment Description of Outlier ID Number Class Description Plant Area Outlier Resolution Q1R17B002-B 1

MCC 1B Auxiliary building El. 121'

1. Inadequate anchorage in
1. Modify rear of MCC anchorage
2. Adjacent MCC bays and
2. Connect MCC transformer not connected bays and transformer Q1R17B008-A 1

MCC 1U Auxiliary building El. 139' Adjacent panel and MCC Connect panel to bays not adequately MCC bays connected Q1R17B009-B 1

MCC 1V Auxiliary building El. 139' Adjacent MCC bays not Connect MCC connected back to back bays together Q1R17B504-A 1

MCC 1K Service water intake El.

Potential bolt bending Resolved by 188'-6" concern analysis Q1 R17B505-B 1

MCC 1L Service water intake El.

Potential bolt bending Resolved by 188'-6" concern analysis QIR17B507-A 1

MCC 1N Diesel generator building El.

Inadequate anchorage Modify anchorage 155' Q1R17B508-B 1

MCC 1P Diesel generator building El.

Inadequate anchorage Modify anchorage 155' 01R17B509-A 1

MCC iS Diesel generator building El.

Inadequate anchorage Modify anchorage 155' QIR17B510-B 1

MCC 1T Diesel generator building El.

1. Potential interaction from
1. Restrain 155' nearby cabinet cabinet
2. Inadequate anchorage
2. Modify anchorage Q1R36A511-B 3

4.16 kV switchgear 1 L Diesel building El. 155' Potential interaction from Restrain cabinet surge arrestor nearby cabinet QSH 1lNGEPB2508-AB 20 Emergency power Auxiliary building El. 155' Potential interaction from Restrain board overhead light overhead light QSH21 E525-A 20 Diesel generator 1-2A Diesel generator building El.

1. Potential interaction from
1. Restrain local 155' overhead light overhead light
2. Bolts missing at cabinet
2. Install missing support bolts
3. Gaps under panel
3. Provide grout under panel QSH21 E528-A 20 Diesel generator 1C Diesel generator building El.
1. Potential interaction from
1. Restrain local control panel 155' overhead light overhead light
2. Gaps under panel
2. Provide grout under panel QSH22L502-A 20 Diesel generator relay Diesel generator building El.
1. Potential interaction from
1. Restrain panel 1-2A 155' overhead light overhead light
2. Missing anchor bolt
2. Replace missing bolt QSH22L504-A 20 Diesel generator relay Diesel generator building El.
1. Potential interaction from
1. Restrain panel 1C 155' overhead light overhead light
2. Interaction from Internal
2. Repair cover cover on relays on relays QSH23S544E-A 20 Diesel generator room Diesel generator building El.

Potential interaction from Restrain 1-2A HVAC 155' overhead light overhead light Page 4 of 5

ATTACHMENT 5: IPEEE VULNERABILITIES INFORMATION NO. SNCF164-RPT-01, VERSION 2.0 Appendix H UNIT 1 Description of Equipment Outliers Equipment Equipment Equipment Description of Outlier ID Number Class Description Plant Area Outlier Resolution QSR17B006-A 1

MCC 1F Auxiliary building El. 155' Inadequate anchorage and Modify anchorage potential interaction from (top brace to wall) adjacent wall QSR17BO07-B 1

MCC IG Auxiliary building El. 155' Inadequate anchorage and Modify anchorage potential interaction from (top brace to wall) adiacent wall QSR42B523A-A 15 125-V-DC service Service water intake El.

Potential bolt bending Resolved by water building battery 188'-6" concern analysis No. 1 QSR42B523B-A 15 125-V-DC service Service water intake El.

Potential bolt bending Resolved by water building battery 188'-6" concern analysis No. 2 QSR42B523C-B 15 125-V-DC service Service water intake El.

Potential bolt bending Resolved by water building battery 188'-6" concern analysis No. 3 QSR42B523D-B 15 125-V-DC service Service water intake El.

Potential bolt bending Resolved by water building battery 188'-6" concern analysis No. 4 QSR42B526B-A 16 Service water building Service water intake El.

Potential interaction from Restrain ladder battery charger No. 2 188'-6" ladder and cart and cart (standby)

QSR43A501-A 17 Diesel generator 1-2A Diesel generator building El.

1. Potential interaction from
1. Restrain (skid) 155' overhead light overhead light
2. Potential interaction from
2. Secure hoist hoist chain chain QSR43A503-A 17 Diesel generator 1C Diesel generator building El.
1. Potential interaction from
1. Restrain (skid) 155' overhead light overhead light
2. Potential interaction from
2. Secure hoist hoist chain chain QSR43L001A-A 20 Diesel generator 1-2A Diesel generator building El.

Potential interaction from Restrain DC control PWR auto 155' overhead light overhead light XFER SW (ATS)

III_

I QSR43L001C-A 20 Diesel generator 1-C Diesel generator building El.

Potential interaction from Restrain DC control PWR auto 155' overhead light overhead light

_XFER (ATS)

I

  • This document has been re-typed from the IPEEE Vulnerabilities Appendix H.

Page 5 of 5

ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6 UNIT 1 - SEISMIC WALKDOWN ENGINEER CERTIFICATIONS (Version 1.0 and Version 2.0)

NO. SNCF164-RPT-01 Page 1 of 21

ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 t

0ENERCON Excellence-Every project. Everyday*

Certificate of Completion is hereby granted to Nikole Arrant for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDOWNS Awarded: 2/27/2013 at Farley Nuclear Plant i

~Kenneth Whitmore Certified Seismic Walkdown Engineer Alexandria, VA - 6/20/2012 Page 2 of 21

ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 Robert W. Ashworth Page 3 of 21

NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS t.I

,ELECTRIC POWER Erma I RESEARCH INSTITUTE Certificate of Completion Robert W. Ashworth Training on Near Term Task Force Recommendation 2.3 - Plant Seismic Walkdowns July 3, 2012 Date Caroline S. ScNaseman, P.E.

Instructor Page 4 of 21

ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 Page 5 of 21

NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS F.3 ENERCON f xcellenc 8-Every P!'006! [. cvry 5,7v Certificate of Completion is hereby granted to Maggie Farah for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDOWNS Awarded: 7/26/2012 in Mt Arlington, NJ Kenneth Whitmore Certified Seismic Walkdown Engineer Alexandria, VA - 6/20/2012 Page 6 of 21

ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 11I11 1.-.~

REI LARCH INSTITUTE Certificateof Completion Ryan Harlos Training on Near Term Task Force Recommendation 2.3

- Plant Seismic Walkdowns June 21, 2012 Date Robedt K. Kanawm EPRI Manage, Structmlu Reliahkty & hftsgrity Page 7 of 21

ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 C-FO~alIRSEAR*Cf INSTITUTE Certificate of Completion Crystal Lovelady Training on Near Term Task Force Recommendation 2.3

- Plant Seismic Walkdowns June 13,2012 Date Robedt K -Kassawar EPRI Manager, Structixal Reliability & Integrity Page 8 of 21

ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 Certificate of Completion This certifies that Crystal R Lovelady Has successfully completed SAM NTTF 2.3 Seismic Walkdown Engineer JFG Completed On 8/18/2012 03:00 PM America/Chicago Page 9 of 21

ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0

~iENERCON Excellence-Evety project Every day.

Certificate of Completion is hereby granted to Laura Maclay for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDO WNS Awarded: 7/26/2012 in Mt. Arlington, NJ Kenneth Whitmore Certified Seismic Walkdown Engineer Alexandria, VA - 6/20/2012 Page 10 of 21

ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 Page 11 of 21

NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS 6~I ia~iii~ii (~I~ (~

I~ f~% ttai Mu t1~ i~

'4~1 'flu' Mfl ftau t4~' tI~1 utai ifluu tt&~ I~

t~ I~i ia~ IAn I&~1

~\\V~fMMMMMMMMMMMMM~

Oft ft-Ii EPRI Electric Power Research Institute Qgcrtifirattc uf Arliicucmctrt Q4isi iz Io (Grrtifjg itat nut A. *iktus Iras Tompletrb tt~

§rismir.39 Abb-On Tgraining Taou rs r N*rlb

'ýuUt 27-29, 1992 I

David A. Freed, MPR Associates SQUG Training Coordinator

ý1ý1 6ntt--ý Robert P. Kassawara, EPRI SQUG Program Manager

'I

~JhIIAIL p

Page 12 of 21

ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 Page 13 of 21

NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS E3 ENERCON Excellence-Every project. Every day.

Certificate of Completion is hereby granted to Terry (Alan) Mullenix for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDOWNS Awarded: 7/11/2012 in Kennesaw, GA

/Kevin Bessell

-7

ý

~lehWhitmore Certified Seismic Walkdown Engineer Certified Seismic Walkdown Engineer Palo Alto, CA - 6/13/2012 Alexandria, VA - 6/20/2012 Page 14 of 21

ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 qf OENERCON Excellence-Every project. Every day, Certificate of Completion is hereby granted to Brian Nelson for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDOWNS Awarded: 2/27/2013 at Farley Nuclear Plant

/

Kenneth Whitmore Certified Seismic Walkdown Engineer Alexandria, VA - 6/20/2012 Page 15 of 21

ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 Page 16 of 21

ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0

'Ii

~II2i Certificateof Completion Kenneth Whitmore Training on Near Term Task Force Recommendation 2.3

- Plant Seismic Walkdowns June 21, 2012 Date IfAOk 44a4oa Robert K.' Kaeaware EPRI Maneger.

Strudaaul Reabb~y & kftgrity Page 17 of 21

NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS lrEl QUGow~

Certfif'cati Presents this of}Achievement To Certify Tiat i-e nt L.1 ilwiUw4j jUii]£ J

has Complted the SQVG Wafkdown Screening andSeismic Evaluation Training Course Held qprif 6,h - 101h, 1992

-V*,

David A. Freed, MPR Associates SQUG Training Coordinator Neil P. Smith. Commionwealth Ediuon SQUG Chamnn Robert P. Kassuwama EPR SQUG Progrnil Mulagu Ul Page 18 of 21

ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 Certfate of Achievement This is to Certify that Kenneth L. Whitmore has Competed the ERIgAdd-On Seismic IEEE Training Course Hlel7d7ovember 2nd through 4 thi, 1992 David A. Freed, MPR Associates Robert P. Kasawara, EPRI Training Coordinator Pwgrant Manager Page 19 of 21

ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS NO. SNCF164-RPT-01, VERSION 2.0 I2I*I EI.1CRic POWER RESITAICH INSTITUTE Certificate of Completion Taylor Youngblood Training on Near Term Task Force Recommendation 2.3

- Plant Seismic Walkdowns July 11, 2012 Date Pabert K. Kusaw~a EM~ Mmgar Structuwa RA~bbty & kftglty Page 20 of 21

NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 6: SEISMIC WALKDOWN ENGINEER CERTIFICATIONS F#3 ENERCON ExCCf'PCC-e Every proje.'c t Every oay.

Certificate of Completion is hereby granted to Steve Yuan for successful completion of TRAINING ON NEAR TERM TASK FORCE RECOMMENDATION 2.3 PLANT SEISMIC WALKDOWNS Awarded: 7/26/2012 in Mt. Arlington, NJ

'--"'f!Ke t Whitmore Certified Seismic Walkdown Engineer Alexandria, VA - 6/20/2012 Page 21 of 21