MPR Associates
From kanterella
Jump to navigation
Jump to search
MPR Associates | |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| From | MONTHYEARML24281A0662024-10-040Site: Davis Besse
[table view]Start date: 4 October 2024 Title: EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components Topic: Commercial Grade Dedication, Basic Component ML24338A0242024-10-030Site: Beaver Valley, Davis Besse Start date: 3 October 2024 Title: MPR Associates, Inc. - Report in Accordance with 10 CFR Part 21 Topic: Commercial Grade Dedication, Basic Component ML24306A0172024-10-030Start date: 3 October 2024 Title: MPR Associates, Inc., Report in Accordance with 10 CFR Part 21 ML24113A2192024-04-230Site: 99902028 Start date: 23 April 2024 Title: Responses to NRC Comments on Ballot 23-2109 ML24113A2202024-04-230Site: 99902028 Start date: 23 April 2024 Title: Responses to NRC Comments on Ballot 23-2109RC1 ML24113A2182024-04-040Site: 99902028 Start date: 4 April 2024 Title: ASME Card Presentation in General Template_Evolving Sec III Rqmts ML23276B4062023-10-030Start date: 3 October 2023 Title: Assessing the Impact of the Inflation Reduction Act on Nuclear Plant Power Uprate and Hydrogen Cogeneration Topic: Power Uprate ML23261C3792023-09-270Site: Nuclear Energy Institute Start date: 27 September 2023 Title: NEI 22-04 Pre-Submittal Meeting with NRC - September 27, 2023 Topic: Commercial Grade Dedication, Commercial Grade, Pre-submittal, Basic Component ML23082A0572023-03-280Site: Nuclear Energy Institute Start date: 28 March 2023 Title: Proposal to Establish Alternate Requirements for Components Commensurate with Safety and Risk Topic: Hydrostatic ML23038A2422023-01-230Site: 99902094 Start date: 23 January 2023 Title: IMRDD-MMR-23-01-NP, Release 1, University of Illinois Urbana-Champaign High Temperature Gas-cooled Research Reactor: Fuel Qualification Methodology ML23019A1602023-01-190Start date: 19 January 2023 Title: EPRI 3 LBB Application January 19, 2023 NRC Meeting ML21048A0852021-02-020Start date: 2 February 2021 Title: MPR Report - Impact of Tertiary Creep on Time Dependent Allowable Stresses for Type 304H and 316H Stainless Steels (MPR Report 0300-0003-RPT-001 ML21048A0862021-02-020Start date: 2 February 2021 Title: Transmittal Letter - Transmittal of Impact of Tertiary Creep on Time Dependent Allowable Stresses for Type 304H and 316H Stainless Steels (MPR Letter 0300-0003-LTR-001); ML20272A2762020-09-280Site: Seabrook Start date: 28 September 2020 Title: Attachment 2 to NextEras Answer Opposing C-10s Motion for Leave to File a Reply and Motion for Leave to File INT053 (NextEra Affidavit) Topic: Aging Management, License Renewal, Affidavit ML19266A6422019-09-230Site: Seabrook Start date: 23 September 2019 Title: Non-Disclosure Affidavit of Christopher W. Bagley Topic: Affidavit ML19266A6482019-09-160Site: Seabrook Start date: 16 September 2019 Title: Non-Disclosure Affidavit of John W. Simons Topic: Affidavit ML18243A2992018-08-290Start date: 29 August 2018 Title: Comment (1) of David Herrell on Behalf of MPR Associates, Inc. on Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassifie ML18243A3002018-08-290Start date: 29 August 2018 Title: Comment (1) of David Herrell on Behalf of MPR Associates, Inc., on Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassifi ONS-2018-016, Calculation 0079-0191-CALC-002, Induced Differential Voltage in Control Cables2018-02-120Site: Oconee Start date: 12 February 2018 Title: Calculation 0079-0191-CALC-002, Induced Differential Voltage in Control Cables ML16279A0502016-07-310Site: Seabrook Start date: 31 July 2016 Title: Enclosure 3: MPR-4153, Revision 2, Seabrook Station-Approach for Determining Through-Thickness Expansion from Alkali-Silica Reaction, July 2016 (Seabrook FP 100918) (Non-proprietary) Topic: Commercial Grade Dedication, License Renewal SBK-L-16153, Calculation 0326-0062-CLC-04, Rev. 0, Calculation of Through-Wall Expansion from Alkali-Silica Reaction To-Date at Seabrook Station2016-07-190Site: Seabrook Start date: 19 July 2016 Title: Calculation 0326-0062-CLC-04, Rev. 0, Calculation of Through-Wall Expansion from Alkali-Silica Reaction To-Date at Seabrook Station ML16279A0512016-07-190Site: Seabrook Start date: 19 July 2016 Title: Calculation 0326-0062-CLC-03, Rev. 2, Correlation Between Through-Thickness Expansion and Elastic Modulus in Concrete Test Specimens Affected by Alkali-Silica Reaction (Asr) Topic: Commercial Grade Dedication ML16020A4772015-12-230Site: Hatch Start date: 23 December 2015 Title: MPR Associates, Inc., - Part 21 Report, MPR Emergency Diesel Engine Timing Module Failure, Per E.I. Hatch, Unit 2 Topic: Basic Component ML16004A0302015-12-230Site: Hatch Start date: 23 December 2015 Title: MPR Associates, Inc. - Part 21 Report, MPR Emergency Diesel Engine Timing Module Failure, Per E.I. Hatch, Unit 2 Topic: Basic Component U-604233, DRN-0065-0055-01 6, Revision 0, Division 3 Shutdown Service Water Pump (ISX01PC) Failure to Start - Calculation Summary2015-07-050Site: Clinton Start date: 5 July 2015 Title: DRN-0065-0055-01 6, Revision 0, Division 3 Shutdown Service Water Pump (ISX01PC) Failure to Start - Calculation Summary Topic: Finite Element Analysis, Preliminary White Finding, Regulatory Conference ML15183A0202015-06-300Site: Seabrook Start date: 30 June 2015 Title: MPR-4153, Rev. 1, Seabrook Station - Approach for Estimating through-Thickness Expansion from Alkali-Silica Reaction Topic: Commercial Grade Dedication, License Renewal, Commercial Grade, Affidavit ML16279A0522015-01-290Site: Seabrook Start date: 29 January 2015 Title: Calculation 0326-0062-CLC-01, Rev. 0, Evaluation of ACI Equation for Elastic Modulus ML16279A0532015-01-280Site: Seabrook Start date: 28 January 2015 Title: Calculation 0326-0074-CLC-02, Rev. 0, Compressive Strength Values for Concrete at Seabrook Station NL-14-1996, Expedited Seismic Evaluation Process Report - Fukushima Near-Term Task Force Recommendation 2.12014-12-300Site: Vogtle Start date: 30 December 2014 Title: Expedited Seismic Evaluation Process Report - Fukushima Near-Term Task Force Recommendation 2.1 Topic: Boric Acid, High Radiation Area, Safe Shutdown Earthquake, Probabilistic Risk Assessment, Locked High Radiation Area, FLEX, Fukushima Dai-Ichi, Earthquake, Power-Operated Valves, Power Operated Valves, Seismic Walkdown Report RS-14-001, Enclosure 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal 1 (Annex a) for the Peach Bottom, Unit 3. Report No. RS-14-0012014-03-250Site: Peach Bottom Start date: 25 March 2014 Title: Enclosure 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal 1 (Annex a) for the Peach Bottom, Unit 3. Report No. RS-14-001 Topic: Safe Shutdown, Unanalyzed Condition, Ultimate heat sink, Safe Shutdown Earthquake, FLEX, High Energy Line Break, Fukushima Dai-Ichi, Design basis earthquake, Feedwater Heater, Spent Fuel Pool Instrumentation, Earthquake, Scaffolding, Power change, Power Uprate, Seismic Walkdown Report ML13092A1182013-03-290Site: Hatch, Davis Besse, Cooper, Farley, Robinson Start date: 29 March 2013 Title: Notification of Potential Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System Topic: Non-Destructive Examination, Aging Management, Commercial Grade, Basic Component ML13010A5182013-01-090Site: Hatch, Cooper Start date: 9 January 2013 Title: Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System Topic: Commercial Grade, Basic Component ML13024A0302013-01-090Site: Cooper Start date: 9 January 2013 Title: MPR Associates Inc., Interim Report in Accordance with 10 CFR Part 21 Topic: Commercial Grade, Basic Component ML13003A0282012-11-160Site: Peach Bottom Start date: 16 November 2012 Title: Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-77 Through Page C-156 Topic: Seismic Walkdown Report ML13003A0252012-11-160Site: Peach Bottom Start date: 16 November 2012 Title: Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page B-104 Topic: Safe Shutdown, Unanalyzed Condition, Boric Acid, Reactor Vessel Water Level, Ultimate heat sink, Stroke time, Commercial Grade Dedication, Safe Shutdown Earthquake, Weld Overlay, Hydrostatic, Finite Element Analysis, High Energy Line Break, Aging Management, Design basis earthquake, Feedwater Heater, Scram Discharge Volume, License Renewal, Earthquake, Flow Induced Vibration, Weak link, GOTHIC, Seismic Walkdown Report, Leak-Before-Break ML13003A0262012-11-160Site: Peach Bottom Start date: 16 November 2012 Title: Report No. MPR-3812, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-372 Through End Topic: Probabilistic Risk Assessment, Scaffolding, Seismic Walkdown Report ML13003A0272012-11-160Site: Peach Bottom Start date: 16 November 2012 Title: Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-1 Through Page C-76 Topic: Scram Discharge Volume, Seismic Walkdown Report ML13003A0292012-11-160Site: Peach Bottom Start date: 16 November 2012 Title: Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-157 Through Page C-249 Topic: Scram Discharge Volume, Seismic Walkdown Report ML13003A0302012-11-160Site: Peach Bottom Start date: 16 November 2012 Title: Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-250 Through Page C-333 Topic: Seismic Walkdown Report ML13003A0312012-11-160Site: Peach Bottom Start date: 16 November 2012 Title: Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-334 Through Page C-399 Topic: Seismic Walkdown Report ML13003A0332012-11-160Site: Peach Bottom Start date: 16 November 2012 Title: Report No. MPR-3812, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page B-104 Topic: Safe Shutdown, Unanalyzed Condition, Boric Acid, Reactor Vessel Water Level, Ultimate heat sink, Stroke time, Commercial Grade Dedication, Safe Shutdown Earthquake, Weld Overlay, Hydrostatic, Finite Element Analysis, High Energy Line Break, Aging Management, Design basis earthquake, Feedwater Heater, Scram Discharge Volume, License Renewal, Earthquake, Flow Induced Vibration, Weak link, GOTHIC, Seismic Walkdown Report, Leak-Before-Break ML13003A0342012-11-160Site: Peach Bottom Start date: 16 November 2012 Title: Report No. MPR-3812, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-1 Through Page C-67 Topic: Reactor Vessel Water Level, Scram Discharge Volume, Seismic Walkdown Report ML13003A0352012-11-160Site: Peach Bottom Start date: 16 November 2012 Title: Report No. MPR-3812, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-68 Through Page C-154 Topic: Seismic Walkdown Report ML13003A0362012-11-160Site: Peach Bottom Start date: 16 November 2012 Title: Report No. MPR-3812, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-155 Through Page C-232 Topic: Scram Discharge Volume, Seismic Walkdown Report ML13003A0372012-11-160Site: Peach Bottom Start date: 16 November 2012 Title: Report No. MPR-3812, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-233 Through Page C-309 Topic: Reactor Vessel Water Level, Seismic Walkdown Report RS-12-173, Report No. MPR-3812, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-310 Through Page C-3712012-11-160Site: Peach Bottom Start date: 16 November 2012 Title: Report No. MPR-3812, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-310 Through Page C-371 Topic: Seismic Walkdown Report ML13003A0322012-11-160Site: Peach Bottom Start date: 16 November 2012 Title: Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-400 Through End Topic: Probabilistic Risk Assessment, Coatings, Scaffolding, Seismic Walkdown Report ML12342A1222012-11-060Site: Limerick Start date: 6 November 2012 Title: MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 4 of 13 Topic: Seismic Walkdown Report ML12342A1232012-11-060Site: Limerick Start date: 6 November 2012 Title: MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 5 of 13 Topic: Seismic Walkdown Report ML12342A1242012-11-060Site: Limerick Start date: 6 November 2012 Title: MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 6 of 13 Topic: Seismic Walkdown Report 2024-04-04 | ||||||||||||||||||||||||
| To | MONTHYEARML23096A1582023-04-130Site: 99902108
[table view]Start date: 13 April 2023 Title: MPR Associates Inc Nuclear Regulatory Commission Inspection Report No. 9992018/2023-201 Topic: Commercial Grade Dedication, Commercial Grade ML23013A1922023-01-170Site: 99902108 Start date: 17 January 2023 Title: Vendor Inspection of MPR Associates, Inc.’S Quality Assurance Program and Title 10 of the Code of Federal Regulations Part 21 Program Implementation ML0037702092000-11-200Site: Boiling Water Reactor Owners Group Start date: 20 November 2000 Title: GE, Withholding from Public Disclosure in Regards to a Letter Dated October 16, 2000, Two Floppy Disks Each Containing BWROG DC Motor Perfomance Methods Topic: Affidavit 2023-04-13 | ||||||||||||||||||||||||