| number = ML14212A414
| number = ML14057A824
| issue date = 07/31/2014
| issue date = 02/20/2014
| title = IR 05000280-14-402 & 05000281-14-402, February 20, 2014, Errata Letter for Surry Power Station, NRC Temporary Instruction 2515/186
| title = IR 05000280-14-402 & 05000281-14-402, January 16, 2014, Surry, NRC Temporary Instruction 2515/186
| author name = Guthrie E
| author name = Guthrie E
| author affiliation = NRC/RGN-II/DRS/EB2
| author affiliation = NRC/RGN-II/DRS
| addressee name = Heacock D
| addressee name = Heacock D
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| addressee affiliation = Dominion, Virginia Electric & Power Co (VEPCO)
| docket = 05000280, 05000281
| docket = 05000280, 05000281
| license number = DPR-032, DPR-037
| license number = DPR-032, DPR-037
Line 12: Line 12:
| document report number = IR-14-402
| document report number = IR-14-402
| document type = Letter
| document type = Letter
| page count = 3
| page count = 5
}}
}}


Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION uly 31, 2014
{{#Wiki_filter:February 20, 2014


==SUBJECT:==
==SUBJECT:==
ERRATA LETTER FOR SURRY POWER STATION - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 05000280/2014402 AND 05000281/2014402
SURRY POWER STATION - NRC TEMPORARY INSTRUCTION 2515/186  
 
INSPECTION REPORT 05000280/2014402 AND 05000281/2014402


==Dear Mr. Heacock:==
==Dear Mr. Heacock:==
On February 20, 2014, the US Nuclear Regulatory Commission (NRC) issued the subject inspection report for the Surry Power Station Units 1 and 2 (ML14057A819 (OUO) ML14057A824 (OUO Removed)).
On January 16, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Surry Power Station using Temporary Instruction 2515/186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats. On January 16, 2014, the NRC inspector discussed the results of this inspection with Mr. Doug Lawrence and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.
In reviewing this report, we identified an administrative error regarding the inspection report numbers.


The inspection report numbers listed as 05000280/2014402 and 05000281/2014402 have been changed to 05000280/201404 and 05000281/201404. Please make the appropriate pen and ink change in the subject report to reflect this change. We apologize for any inconvenience.
The objective of this inspection was to assess the implementation procedures and processes of Surry Power Station that are required by Title 10 of the Code of Federal Regulations (CFR),
Part 50.54(hh)(1), which provides the requirements for responding to a potential aircraft threat.


In accordance with 10 CFR 2.390 of the NRCs Rules of Practice a copy of this letter, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The results from this inspection, along with the results from this inspection performed at other operating commercial nuclear plants in the United States, will be used to evaluate the U.S.


Should you have any questions concerning this letter, please contact me at 404 997-4662.
nuclear industrys readiness to safely respond to similar events. These results will also help the NRC to determine if additional regulatory actions are warranted.
 
The NRC inspector did not identify any findings or violations of more than minor significance.
 
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1).
 
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.


Sincerely,
Sincerely,
/RA/
/RA/  
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-280 and 50-281 License Nos.: DPR-32 and DPR-37 cc: (See page 2)
 
Eugene F. Guthrie, Chief  
 
Operations Branch 2  
 
Division of Reactor Safety  
 
Docket No. 50-280 and 50-281 License No. DPR-32 and DPR-37 Enclosure: Inspection Report 05000280/2014402, 05000281/2014402 w/Attachment: Supplementary Information (Official Use Only)
 
cc: (See page 3)
 
__ML14057A824_______________ x SUNSI REVIEW COMPLETE x FORM 665 ATTACHED OFFICE RII:DRS RII:DRP RII:DRS RII:DRS
 
SIGNATURE AXT6 MFK1 BBD GXG
 
NAME JATOTH MKING BDESAI EGUTHRIE
 
DATE 2/19/2014 2/19/2014 2/19/2014 2/20/2014 2/ /2014 2/ /2014 2/ /2014 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc:
Nelson K. Martin Manager Nuclear Fleet Protection Services Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
 
Margaret A. Earle Nuclear Licensing and Operations Support Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
 
Gregory S. Haynes Manager, Nuclear Protection Services Surry Power Station 5570 Hog Island Road Surry, VA 23883-0315 Letter to David Heacock from Eugene F. Guthrie dated February 20, 2014.
 
SUBJECT:
SURRY POWER STATION - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 05000280/2014402 AND 05000281/2014402
 
Distribution:
RidsNrrPMSurry Resource C. Evans, RII EICS L. Douglas, RII EICS RIDSNRRDIRS S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR B. Huffman, NSIR/DPR/DDIR/OB J. Kozal, NSIR/DPR/DDIR/CB E. Bowman, NRR/DPR/PGCB T. Dimitriadis, RI B. Desai, RII D. Funk, RIII M. Haire, RIV


_ML14212A414_______________  SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE AXT6 * EFG NAME  ATOTH EGUTHRIE DATE  7/31/2014 7/31/2014 8/ /2014 8/ /2014 8/ /2014 8/ /2014 8/ /2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc:
Distribution w/o Enclosure:
Gregory Haynes Surry Power Station 5570 Hog Island Road Surry, VA 23883-0315
PUBLIC
}}
}}

Latest revision as of 23:00, 10 January 2025

IR 05000280-14-402 & 05000281-14-402, January 16, 2014, Surry, NRC Temporary Instruction 2515/186
ML14057A824
Person / Time
Site: Surry  Dominion icon.png
Issue date: 02/20/2014
From: Eugene Guthrie
Division of Reactor Safety II
To: Heacock D
Dominion, Virginia Electric & Power Co (VEPCO)
References
IR-14-402
Download: ML14057A824 (5)


Text

February 20, 2014

SUBJECT:

SURRY POWER STATION - NRC TEMPORARY INSTRUCTION 2515/186

INSPECTION REPORT 05000280/2014402 AND 05000281/2014402

Dear Mr. Heacock:

On January 16, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Surry Power Station using Temporary Instruction 2515/186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats. On January 16, 2014, the NRC inspector discussed the results of this inspection with Mr. Doug Lawrence and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.

The objective of this inspection was to assess the implementation procedures and processes of Surry Power Station that are required by Title 10 of the Code of Federal Regulations (CFR),

Part 50.54(hh)(1), which provides the requirements for responding to a potential aircraft threat.

The results from this inspection, along with the results from this inspection performed at other operating commercial nuclear plants in the United States, will be used to evaluate the U.S.

nuclear industrys readiness to safely respond to similar events. These results will also help the NRC to determine if additional regulatory actions are warranted.

The NRC inspector did not identify any findings or violations of more than minor significance.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1).

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Sincerely,

/RA/

Eugene F. Guthrie, Chief

Operations Branch 2

Division of Reactor Safety

Docket No. 50-280 and 50-281 License No. DPR-32 and DPR-37 Enclosure: Inspection Report 05000280/2014402, 05000281/2014402 w/Attachment: Supplementary Information (Official Use Only)

cc: (See page 3)

__ML14057A824_______________ x SUNSI REVIEW COMPLETE x FORM 665 ATTACHED OFFICE RII:DRS RII:DRP RII:DRS RII:DRS

SIGNATURE AXT6 MFK1 BBD GXG

NAME JATOTH MKING BDESAI EGUTHRIE

DATE 2/19/2014 2/19/2014 2/19/2014 2/20/2014 2/ /2014 2/ /2014 2/ /2014 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc:

Nelson K. Martin Manager Nuclear Fleet Protection Services Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

Margaret A. Earle Nuclear Licensing and Operations Support Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

Gregory S. Haynes Manager, Nuclear Protection Services Surry Power Station 5570 Hog Island Road Surry, VA 23883-0315 Letter to David Heacock from Eugene F. Guthrie dated February 20, 2014.

SUBJECT:

SURRY POWER STATION - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 05000280/2014402 AND 05000281/2014402

Distribution:

RidsNrrPMSurry Resource C. Evans, RII EICS L. Douglas, RII EICS RIDSNRRDIRS S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR B. Huffman, NSIR/DPR/DDIR/OB J. Kozal, NSIR/DPR/DDIR/CB E. Bowman, NRR/DPR/PGCB T. Dimitriadis, RI B. Desai, RII D. Funk, RIII M. Haire, RIV

Distribution w/o Enclosure:

PUBLIC