{{#Wiki_filter:Appendix E -
{{#Wiki_filter:Appendix E -
Project Data Quality Parameter Crosswalk
Project Data Quality Parameter Crosswalk  


.,
Appendix E - Project Data Quality Parameter Crosswalk Field Data Quality Parameters Data Quality Field Activity-Equipment Calibration
Appendix E - Project Data Quality Parameter Crosswalk Field Data Quality Parameters Data Quality   Field Activity-     Equipment         Calibration
* Operability Acceptance Criteri.a  
* Operability   Acceptance Criteri.a *
*
* Criteria   Criteria Met.
* Criteria Criteria Met.
Indicator         Check                                               Check                                 Identified       Y/N (PARCC Parameter)
Indicator Check Check Identified Y/N (PARCC Parameter)
Precision           Soil Samples   Duplicate Sample   Not             Not             10% Relative         Quality       y applicable     applicable     Difference (RPD)     Assurance between duplicates,   Project Plan -
Precision Soil Samples Duplicate Sample Not Not 10% Relative Quality y
1/10 samples and 2   A.6.1, B.5.2.1 duplicates per sub-area Precision           No Soil Sample   Equipment           Not             Not             Less than Minimum     Quality       y Cross-     Rinsate Blanks     applicable     applicable     Detectable           Assurance Contamination                                                       Concentration         Project Plan -
applicable applicable Difference (RPD)
(MDC) on equipment   A.6.1, B.4.1, rinsate blanks       B.5.2.2 Precision             No Sample     Deionized Water     Not             Not             Less than Detection   Quality       y Equipment     Blank               applicable     applicable     Limits in DI water   Assurance Cross-                                                         blanks               Project Plan -
Assurance between duplicates, Project Plan -
Contamination                                                                             A.6.1, B.4.1, B.5.2.2 Accuracy             Course Grid     Ludlum 2241-2       Annual         Daily {3       Within annual         Quality       y Walkover     Scaler/Ratemeter   calibration. times/day)     calibration, +/-20%   Assurance coupled with       Daily source                   source gross cpm     Project Plan -
1/10 samples and 2 A.6.1, B.5.2.1 duplicates per sub-area Precision No Soil Sample Equipment Not Not Less than Minimum Quality y
2"X2" Nal           checks.                                               A.6.1, B.6.1, Gamma Detector                                                           B.7.1 and GPS Instrument Accuracy           Location Specific Bicron Microrem     Annual         Daily {3       Within annual         Quality       y Static Survey   Meter               calibration. times/day)     calibration,+/- 20%   Assurance Daily source                   source uRem/hr       Project Plan -
Cross-Rinsate Blanks applicable applicable Detectable Assurance Contamination Concentration Project Plan -
checks.                                               A.6.1, B.6.1, B.7.1
(MDC) on equipment A.6.1, B.4.1, rinsate blanks B.5.2.2 Precision No Sample Deionized Water Not Not Less than Detection Quality y
Equipment Blank applicable applicable Limits in DI water Assurance Cross-blanks Project Plan -
Contamination A.6.1, B.4.1, B.5.2.2 Accuracy Course Grid Ludlum 2241-2 Annual Daily {3 Within annual Quality y
Walkover Scaler/Ratemeter calibration.
times/day) calibration, +/-20%
Assurance coupled with Daily source source gross cpm Project Plan -
2"X2" Nal checks.
A.6.1, B.6.1, Gamma Detector B.7.1 and GPS Instrument Accuracy Location Specific Bicron Microrem Annual Daily {3 Within annual Quality y
Static Survey Meter calibration.
times/day) calibration,+/- 20%
Assurance Daily source source uRem/hr Project Plan -
checks.
A.6.1, B.6.1, B.7.1  


Appendix E - Project Data Quality Parameter Crosswalk Accuracy           Location Specific Ludlum 2241-2     Annual           Daily (3       Within annual       Quality       y Static Survey   Scaler/Ratemeter   calibration. times/day)       calibration, +/-20% Assurance coupled with       Daily source                   source Gross cpm   Project Plan -
Appendix E - Project Data Quality Parameter Crosswalk Accuracy Location Specific Ludlum 2241-2 Annual Daily (3 Within annual Quality y
2"X2" Nal         checks.                                             A.6.1, B.6.1, Gamma Detector                                                         B.7.1 Representativeness Walkover Area   Global             Not             Daily.         At designated       Quality       y Location     Positioning .     applicable.                     walkover location. Assurance System (GPS)       Commercial                     Verified with       Project Plan -
Static Survey Scaler/Ratemeter calibration.
GPS.                             multiple GPS' and   A.6.1 landmarks.
times/day) calibration, +/-20%
Representativeness   Sample Area     GPS               Not             Daily.         At designated       Quality       y Location                         applicable.                     sample location. Assurance Commercial                     Verified with       Project Plan -
Assurance coupled with Daily source source Gross cpm Project Plan -
GPS.                           multiple GPS' and   A.6.1 landmarks.
2"X2" Nal checks.
Representativeness   Soil Depth     Standard Tape     Not             Not             Samples collected at Quality       y Determination   Measure/Ruler     applicable. applicable. designated depths,   Assurance Standard                       verified by second   Project Plan -
A.6.1, B.6.1, Gamma Detector B.7.1 Representativeness Walkover Area Global Not Daily.
measuring                       technician.         A.6.1 device.
At designated Quality y
Completeness         Sampling       Not applicable     Not             Not             95% of samples       Quality       y applicable     *applicable     targeted for         Assurance Collection           Project Plan -
Location Positioning.
A.6.1 Completeness       Data Usability   Not applicable     Not             Not             90% data usability   Quality       y applicable     applicable                           Assurance Project Plan -
applicable.
A.6.1
walkover location.
-
Assurance System (GPS)
Commercial Verified with Project Plan -
GPS.
multiple GPS' and A.6.1 landmarks.
Representativeness Sample Area GPS Not Daily.
At designated Quality y
Location applicable.
sample location.
Assurance Commercial Verified with Project Plan -
GPS.
multiple GPS' and A.6.1 landmarks.
Representativeness Soil Depth Standard Tape Not Not Samples collected at Quality y
Determination Measure/Ruler applicable.
applicable.
designated depths, Assurance Standard verified by second Project Plan -
measuring technician.
A.6.1 device.
Completeness Sampling Not applicable Not Not 95% of samples Quality y
applicable  
*applicable targeted for Assurance Collection Project Plan -
A.6.1 Completeness Data Usability Not applicable Not Not 90% data usability Quality y
applicable applicable Assurance Project Plan -
A.6.1 l -


, r Appendix E,.... Project Data Quality Parameter Crosswalk Laboratory Data Quality Parameters Data Quality Indicator           Parameter                       Acceptance Criteria         Criteria Identified     Criteria Met Y/N (PARCC Parameter)
r Appendix E,.... Project Data Quality Parameter Crosswalk Laboratory Data Quality Parameters Data Quality Indicator Parameter Acceptance Criteria Criteria Identified Criteria Met Y /N (PARCC Parameter)
Precision       Relative Percent Difference         10%                           Quality Assurance Project y (RPO)                                                             Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Precision       Relative Error Ratio (RER)         < 1.96                         Quality Assurance Project y Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Precision       Background Data                     Initial startup calibration   Quality Assurance Project y Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Precision       Count Time                         Per GEL analytical method     Quality Assurance Project y Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy         Matrix Spike {MS) or               GEL QAP                       Quality Assurance Project y MS/Matrix Spike Duplicate                                         Plan A.6.1, B.4, B.5.3,
Precision Relative Percent Difference 10%
{MSD)                                                             analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy         Tracer Percent Recovery (R)         GEL QAP                       Quality Assurance Project y Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy         Sample & Standards prep             10%                           Quality Asswance Project y
Quality Assurance Project y
(RPO)
Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Precision Relative Error Ratio (RER)  
< 1.96 Quality Assurance Project y
Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Precision Background Data Initial startup calibration Quality Assurance Project y
Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Precision Count Time Per GEL analytical method Quality Assurance Project y
Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy Matrix Spike {MS) or GEL QAP Quality Assurance Project y
MS/Matrix Spike Duplicate Plan A.6.1, B.4, B.5.3,
{MSD) analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy Tracer Percent Recovery (R)
GEL QAP Quality Assurance Project y
Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy Sample & Standards prep 10%
Quality Asswance Project y  


Appendix E - Project Data Quality Parameter Crosswalk Batch Calculations                                             Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy/Precision Instrument Calibration (Initial 1 per 24 hrs (ICV) 1 per 12   Quality Assurance Project y
Appendix E - Project Data Quality Parameter Crosswalk Batch Calculations Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy/Precision Instrument Calibration (Initial 1 per 24 hrs (ICV) 1 per 12 Quality Assurance Project y  
                      & Continuing)                   hrs (CCV)                     Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy/Precision Frequency of Calibration         1 per 24 hrs (ICV) 1 per 12   Quality Assurance Project hrs (CCV)                     Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan,
& Continuing) hrs (CCV)
                                                                        '
Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy/Precision Frequency of Calibration 1 per 24 hrs (ICV) 1 per 12 Quality Assurance Project hrs (CCV)
es/er/ms-5 Accuracy/Completeness 10% Sample and Standards         NIST traceable standards       Quality Assurance Project y Traceability                                                   Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Representativeness Field and Method Blanks         < MDC and 2s counting         Quality Assurance Project y uncertainty                   Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Completeness     Chain-of-Custody (COC) Review   Completeness                   Quality Assurance Project y
Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy/Completeness 10% Sample and Standards NIST traceable standards Quality Assurance Project y
                                                                                    *Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5}}
Traceability Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Representativeness Field and Method Blanks  
< MDC and 2s counting Quality Assurance Project y
uncertainty Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Completeness Chain-of-Custody (COC) Review Completeness Quality Assurance Project y  
*Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5}}

Latest revision as of 19:42, 9 January 2025

Radiological Survey and Dose Assessment Report for the Western New York Nuclear Service Center & Off-Site Areas in Follow Up to Aerial Gamma Radiation Survey Conducted in 2014, Rev. 0, Appendix E - Part 22 of 24
ML16293A849
Person / Time
Site: West Valley Demonstration Project, P00M-032
Issue date: 08/22/2016
From:
MJW Technical Services
To:
Office of Nuclear Material Safety and Safeguards, State of NY, Energy Research & Development Authority, Office of Nuclear Reactor Regulation
Shared Package
ML16293A155 List: ... further results
References
Download: ML16293A849 (5)


Text

Appendix E -

Project Data Quality Parameter Crosswalk

Appendix E - Project Data Quality Parameter Crosswalk Field Data Quality Parameters Data Quality Field Activity-Equipment Calibration

  • Operability Acceptance Criteri.a
  • Criteria Criteria Met.

Indicator Check Check Identified Y/N (PARCC Parameter)

Precision Soil Samples Duplicate Sample Not Not 10% Relative Quality y

applicable applicable Difference (RPD)

Assurance between duplicates, Project Plan -

1/10 samples and 2 A.6.1, B.5.2.1 duplicates per sub-area Precision No Soil Sample Equipment Not Not Less than Minimum Quality y

Cross-Rinsate Blanks applicable applicable Detectable Assurance Contamination Concentration Project Plan -

(MDC) on equipment A.6.1, B.4.1, rinsate blanks B.5.2.2 Precision No Sample Deionized Water Not Not Less than Detection Quality y

Equipment Blank applicable applicable Limits in DI water Assurance Cross-blanks Project Plan -

Contamination A.6.1, B.4.1, B.5.2.2 Accuracy Course Grid Ludlum 2241-2 Annual Daily {3 Within annual Quality y

Walkover Scaler/Ratemeter calibration.

times/day) calibration, +/-20%

Assurance coupled with Daily source source gross cpm Project Plan -

2"X2" Nal checks.

A.6.1, B.6.1, Gamma Detector B.7.1 and GPS Instrument Accuracy Location Specific Bicron Microrem Annual Daily {3 Within annual Quality y

Static Survey Meter calibration.

times/day) calibration,+/- 20%

Assurance Daily source source uRem/hr Project Plan -

checks.

A.6.1, B.6.1, B.7.1

Appendix E - Project Data Quality Parameter Crosswalk Accuracy Location Specific Ludlum 2241-2 Annual Daily (3 Within annual Quality y

Static Survey Scaler/Ratemeter calibration.

times/day) calibration, +/-20%

Assurance coupled with Daily source source Gross cpm Project Plan -

2"X2" Nal checks.

A.6.1, B.6.1, Gamma Detector B.7.1 Representativeness Walkover Area Global Not Daily.

At designated Quality y

Location Positioning.

applicable.

walkover location.

Assurance System (GPS)

Commercial Verified with Project Plan -

GPS.

multiple GPS' and A.6.1 landmarks.

Representativeness Sample Area GPS Not Daily.

At designated Quality y

Location applicable.

sample location.

Assurance Commercial Verified with Project Plan -

GPS.

multiple GPS' and A.6.1 landmarks.

Representativeness Soil Depth Standard Tape Not Not Samples collected at Quality y

Determination Measure/Ruler applicable.

applicable.

designated depths, Assurance Standard verified by second Project Plan -

measuring technician.

A.6.1 device.

Completeness Sampling Not applicable Not Not 95% of samples Quality y

applicable

  • applicable targeted for Assurance Collection Project Plan -

A.6.1 Completeness Data Usability Not applicable Not Not 90% data usability Quality y

applicable applicable Assurance Project Plan -

A.6.1 l -

r Appendix E,.... Project Data Quality Parameter Crosswalk Laboratory Data Quality Parameters Data Quality Indicator Parameter Acceptance Criteria Criteria Identified Criteria Met Y /N (PARCC Parameter)

Precision Relative Percent Difference 10%

Quality Assurance Project y

(RPO)

Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Precision Relative Error Ratio (RER)

< 1.96 Quality Assurance Project y

Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Precision Background Data Initial startup calibration Quality Assurance Project y

Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Precision Count Time Per GEL analytical method Quality Assurance Project y

Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy Matrix Spike {MS) or GEL QAP Quality Assurance Project y

MS/Matrix Spike Duplicate Plan A.6.1, B.4, B.5.3,

{MSD) analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy Tracer Percent Recovery (R)

GEL QAP Quality Assurance Project y

Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy Sample & Standards prep 10%

Quality Asswance Project y

Appendix E - Project Data Quality Parameter Crosswalk Batch Calculations Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy/Precision Instrument Calibration (Initial 1 per 24 hrs (ICV) 1 per 12 Quality Assurance Project y

& Continuing) hrs (CCV)

Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy/Precision Frequency of Calibration 1 per 24 hrs (ICV) 1 per 12 Quality Assurance Project hrs (CCV)

Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy/Completeness 10% Sample and Standards NIST traceable standards Quality Assurance Project y

Traceability Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Representativeness Field and Method Blanks

< MDC and 2s counting Quality Assurance Project y

uncertainty Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Completeness Chain-of-Custody (COC) Review Completeness Quality Assurance Project y

  • Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5