{{#Wiki_filter:QF1075-01 Rev. 5 (FP-T-SAT-75)
{{#Wiki_filter:QF1075-01 Rev. 5 (FP-T-SAT-75)
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JOB PERFORMANCE MEASURE (JPM)
JOB PERFORMANCE MEASURE (JPM)
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   CONTROL ROD DRIVE EXERCISE JPM NUMBER:                   JPM-0074-002                     REV.       0 RELATED PRA                   None INFORMATION:
SITE:
TASK NUMBERS /               CR200.226 TASK TITLE(S):               Respond to a drifting control rod K/A NUMBERS:                 201003         A2.03                 Rating: SRO/RO:     3.7/3.4 APPLICABLE METHOD OF TESTING:
MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
Discussion:                 Simulate/walkthrough:               Perform:
CONTROL ROD DRIVE EXERCISE JPM NUMBER:
EVALUATION LOCATION:             In-Plant:                             Control Room:
JPM-0074-002 REV.
Simulator:                             Other:
0 RELATED PRA INFORMATION:
None TASK NUMBERS /
TASK TITLE(S):
CR200.226 Respond to a drifting control rod K/A NUMBERS:
201003 A2.03 Rating: SRO/RO:
3.7/3.4 APPLICABLE METHOD OF TESTING:
Discussion:
Simulate/walkthrough:
Perform:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Other:
Lab:
Lab:
Time for Completion:         15       Minutes                   Time Critical:     No Alternate Path:             Yes TASK APPLICABILITY:               SRO:             RO:             NLO Additional site-specific signatures may be added as desired.
Time for Completion:
15 Minutes Time Critical:
No Alternate Path:
Yes TASK APPLICABILITY:
SRO:
RO:
NLO Additional site-specific signatures may be added as desired.
Developed by:
Developed by:
Developer                                   Date Validated by:
Developer Date Validated by:
Validator                                 Date (See JPM Validation Checklist, Attachment 1)
Validator (See JPM Validation Checklist, Attachment 1)
Approved by:
Date Approved by:
Training Supervisor                             Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Training Supervisor Date  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                       Page 2 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 2 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                         Page 3 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 INITIAL CONDITIONS:
QF1075-01 Rev. 5 (FP-T-SAT-75)
* The plant is operating at 100% power. Control Rod Drive Exercise, Test 0074, is being performed.
Page 3 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
* The RO performing the test has performed a turnover with you.
INITIAL CONDITIONS:
The plant is operating at 100% power. Control Rod Drive Exercise, Test 0074, is being performed.
The RO performing the test has performed a turnover with you.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
* Continue with Test 0074 at Control Rod 18-35.
Continue with Test 0074 at Control Rod 18-35.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                 Page 4 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 JPM PERFORMANCE INFORMATION Required Materials:
QF1075-01 Rev. 5 (FP-T-SAT-75)
* Test 0074 initialized and completed per setup instructions
Page 4 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
* Control rod position printout (from step 1 of 0074)
JPM PERFORMANCE INFORMATION Required Materials:
Test 0074 initialized and completed per setup instructions Control rod position printout (from step 1 of 0074)
General  
General  


==References:==
==References:==
* 0074
0074 C.4-B.01.03.C TaskStandards:
* C.4-B.01.03.C TaskStandards:             Perform the Operator Actions for a drifting control rod Start Time:
Perform the Operator Actions for a drifting control rod Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Performance Step: 1             (0074 STEP 3) Select a withdrawn control rod by depressing the Critical Y                      appropriate rod select pushbutton. Verify that the selected rod select pushbutton is illuminated and the selected rod indicates selection on the full-core display.
Performance Step: 1 Critical Y (0074 STEP 3) Select a withdrawn control rod by depressing the appropriate rod select pushbutton. Verify that the selected rod select pushbutton is illuminated and the selected rod indicates selection on the full-core display.
Standard:                       Selects rod 18-35 Evaluator Cue:                 None Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
Standard:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Selects rod 18-35 Evaluator Cue:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                   Page 5 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Performance Step: 2             (0074 STEP 5) Insert the selected rod one notch by momentarily placing Critical Y                      switch 3A-S2, ROD MOVEMENT CONTROL, in ROD IN position and verify the rod position indication for the selected control rod in the single rod and the four rod group display changes to the next lower latched position.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Standard:                       Places 3A-S2 in the ROD IN position.
Page 5 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Evaluator Cue:                 None Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
Performance Step: 2 Critical Y (0074 STEP 5) Insert the selected rod one notch by momentarily placing switch 3A-S2, ROD MOVEMENT CONTROL, in ROD IN position and verify the rod position indication for the selected control rod in the single rod and the four rod group display changes to the next lower latched position.
Performance Step: 3             (0074 STEP 6) Withdraw the selected rod one notch by momentarily Critical Y                      placing switch 3A-S2, ROD MOVEMENT CONTROL, in ROD OUT position and verify the rod position indication for the selected control rod in the single rod and the four rod group display changes to the next higher latched position.
Standard:
Standard:                       Places 3A-S2 in the ROD OUT position.
Places 3A-S2 in the ROD IN position.
Evaluator Cue:                 None Evaluator Note:                 Ensure malfunction CH01_084 inserts when the candidate withdraws the rod. Rod 18-35 should start moving out.
Evaluator Cue:
Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
None Performance:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 3 Critical Y (0074 STEP 6) Withdraw the selected rod one notch by momentarily placing switch 3A-S2, ROD MOVEMENT CONTROL, in ROD OUT position and verify the rod position indication for the selected control rod in the single rod and the four rod group display changes to the next higher latched position.
Standard:
Places 3A-S2 in the ROD OUT position.
Evaluator Cue:
None Evaluator Note:
Ensure malfunction CH01_084 inserts when the candidate withdraws the rod. Rod 18-35 should start moving out.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                             Page 6 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Performance Step: 4             Alternate Path:
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical N Scans the Full Core Display and determines the number of control rods that are drifting.
Page 6 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Standard:                       Scans the Full Core Display on C-05 for the rod with the RED drifting light ON.
Performance Step: 4 Critical N Alternate Path:
Evaluator Cue:                 None Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
Scans the Full Core Display and determines the number of control rods that are drifting.
Performance Step: 5             (C.4-B.01.03.C Procedure Step 1)
Standard:
Critical N Immediate Action If more than one control rod is drifting, Then insert a manual reactor scram.
Scans the Full Core Display on C-05 for the rod with the RED drifting light ON.
Standard:                       Verifies only one rod is drifting and goes to STEP 2.
Evaluator Cue:
Evaluator Cue:                 None Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
None Performance:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 5 Critical N (C.4-B.01.03.C Procedure Step 1)
Immediate Action If more than one control rod is drifting, Then insert a manual reactor scram.
Standard:
Verifies only one rod is drifting and goes to STEP 2.
Evaluator Cue:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                 Page 7 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Performance Step: 6             (C.4-B.01.03.C Procedure Step 2)
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical Y Immediate Action Momentarily place ROD SELECT POWER SWITCH 3A-S1 (Panel C-05) in OFF and return it to ON to de-energize the rod select matrix and de-select the drifting control rod.
Page 7 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Standard:                       1. Turns ROD SELECT POWER SWITCH to OFF (non-critical); and
Performance Step: 6 Critical Y (C.4-B.01.03.C Procedure Step 2)
Immediate Action Momentarily place ROD SELECT POWER SWITCH 3A-S1 (Panel C-05) in OFF and return it to ON to de-energize the rod select matrix and de-select the drifting control rod.
Standard:
: 1. Turns ROD SELECT POWER SWITCH to OFF (non-critical); and
: 2. Then turns ROD SELECT POWER SWITCH to the ON position (Critical ONLY if power switch was turned to OFF).
: 2. Then turns ROD SELECT POWER SWITCH to the ON position (Critical ONLY if power switch was turned to OFF).
(Non-Critical portion of Standard)
(Non-Critical portion of Standard)
Operator should verify that no rod is selected after turning the switch ON.
Operator should verify that no rod is selected after turning the switch ON.
Evaluator Cue:                 None Performance:                   SATISFACTORY             UNSATISFACTORY Comments:
Evaluator Cue:
Performance Step: 7             (C.4-B.01.03.C Procedure STEP 3)
None Performance:
Critical Y Immediate Action If control rod drifting continues, Then re-select the drifting control rod, And insert and maintain the control rod at position 00 using normal or emergency insert.
SATISFACTORY UNSATISFACTORY Comments:
Standard:                       1. Drifting control rod is selected and inserted to 00 using either the NORMAL or EMERGENCY insert handswitch.
Performance Step: 7 Critical Y (C.4-B.01.03.C Procedure STEP 3)
Immediate Action If control rod drifting continues, Then re-select the drifting control rod, And insert and maintain the control rod at position 00 using normal or emergency insert.
Standard:
: 1. Drifting control rod is selected and inserted to 00 using either the NORMAL or EMERGENCY insert handswitch.
: 2. Drifting control rod is maintained at 00.
: 2. Drifting control rod is maintained at 00.
Evaluator Cue:                 If examinee requests to release the ROD IN switch, allow them to do so the rod will drift out again forcing them to reinsert it.
Evaluator Cue:
Evaluator Note:                 BOOTH OPERATOR: If the examinee holds the ROD IN then delete the drift out malfunction. If the examinee attempts to release the ROD IN switch do not delete the malfunction until they observe it drift out again and then reinsert the control rod.
If examinee requests to release the ROD IN switch, allow them to do so the rod will drift out again forcing them to reinsert it.
Performance:                   SATISFACTORY             UNSATISFACTORY Comments:
Evaluator Note:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
BOOTH OPERATOR: If the examinee holds the ROD IN then delete the drift out malfunction. If the examinee attempts to release the ROD IN switch do not delete the malfunction until they observe it drift out again and then reinsert the control rod.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                             Page 8 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Performance Step: 8             (C.4-B.01.03.C Procedure STEP 4)
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical N Immediate Action Notify Shift Supervision.
Page 8 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Standard:                       Notifies Shift Supervision IAW OWI-01.03.
Performance Step: 8 Critical N (C.4-B.01.03.C Procedure STEP 4)
Evaluator Cue:                 Acknowledge as the CRS Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
Immediate Action Notify Shift Supervision.
Terminating Cues:         When rod 18-35 has been fully inserted and the CRS has been notified, inform the operator that the JPM is complete.
Standard:
Notifies Shift Supervision IAW OWI-01.03.
Evaluator Cue:
Acknowledge as the CRS Performance:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
When rod 18-35 has been fully inserted and the CRS has been notified, inform the operator that the JPM is complete.
Stop Time:
Stop Time:
Historical Record: New create for the 2016 ILT NRC Exam Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Historical Record: New create for the 2016 ILT NRC Exam  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                             Page 9 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Simulator Setup (as required):
QF1075-01 Rev. 5 (FP-T-SAT-75)
* Any IC with rod 18-35 withdrawn to an intermediate position.
Page 9 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
* Verify rod 18-39 is selected
Simulator Setup (as required):
* Insert malfunction CH01_084 for CRD 18-35 on event 1.
Any IC with rod 18-35 withdrawn to an intermediate position.
* Set event 1 to trigger on ZD_CRDWD.
Verify rod 18-39 is selected Insert malfunction CH01_084 for CRD 18-35 on event 1.
* Obtain a Control Rod position print out.
Set event 1 to trigger on ZD_CRDWD.
* Initialize Surveillance Test 0074 SIMULATOR INPUT  
Obtain a Control Rod position print out.
Initialize Surveillance Test 0074 SIMULATOR INPUT  


==SUMMARY==
==SUMMARY==
Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger 1
Malf CH01
_084 Control Rod 18-35 Drift out 00:00:05 Active 1
2 Malf CH01
_084 Control Rod 18-35 Drift out (Deletes in 1 second)
Active 2
Malf CH15
_084 CR 18-35 Elec DISARM DISARM


Manual                                                                              Severity    Event Trigger      Type    Code              Description                  Delay    Ramp Or Value    Trigger 1        Malf    CH01      Control Rod 18-35 Drift out        00:00:05          Active        1
QF1075-01 Rev. 5 (FP-T-SAT-75)
_084 2        Malf    CH01      Control Rod 18-35 Drift out                          Active
Page 10 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
_084        (Deletes in 1 second) 2        Malf    CH15      CR 18-35 Elec DISARM                                DISARM
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
_084 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
REVIEW STATEMENTS YES NO N/A
 
: 1.
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                            Page 10 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
Are all items on the cover page filled in correctly?
REVIEW STATEMENTS                                                                   YES NO       N/A
: 2.
: 1. Are all items on the cover page filled in correctly?
Has the JPM been reviewed and validated by SMEs?
: 2. Has the JPM been reviewed and validated by SMEs?
: 3.
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 4.
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 5.
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 6.
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8.
Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 9.
Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 10. Have the performance steps been identified and typed (Critical /
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
Sequence / Time Critical) appropriately?
Line 134: Line 203:
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________                  __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date  
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                         Page 11 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 ATTACHMENT 2 JPM Number: JPM-0074-002 JPM Title: Control Rod Drive Exercise Examinee & ID:                                                   Evaluator:
QF1075-01 Rev. 5 (FP-T-SAT-75)
Job Title:                                                     Date:
Page 11 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Start Time                                               Finish Time PERFORMANCE RESULTS:                                 SAT:                       UNSAT:
ATTACHMENT 2 JPM Number: JPM-0074-002 JPM
 
==Title:==
Control Rod Drive Exercise Examinee & ID:
Evaluator:
Job
 
==Title:==
Date:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                       Page 12 of 12 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
QF1075-01 Rev. 5 (FP-T-SAT-75)
* The plant is operating at 100% power. Control Rod Drive Exercise, Test 0074, is being performed.
Page 12 of 12 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
* The RO performing the test has performed a turnover with you.
ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
The plant is operating at 100% power. Control Rod Drive Exercise, Test 0074, is being performed.
The RO performing the test has performed a turnover with you.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
* Continue with Test 0074 at Control Rod 18-35.
Continue with Test 0074 at Control Rod 18-35.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)
QF1075-01 Rev. 5 (FP-T-SAT-75)
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JOB PERFORMANCE MEASURE (JPM)
JOB PERFORMANCE MEASURE (JPM)
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   STARTUP THE RWCU SYSTEM JPM NUMBER:                   JPM-B.02.02-001                   REV.       11 RELATED PRA                   None INFORMATION:
SITE:
TASK NUMBERS /               CR204.102; NL204.101; NL204.105 TASK TITLE(S):                Place RWCU System In Service with No. 11 RWCU Pump and 11 RWCU Filter/Demineralizer In Service 204000                 A2.04                             2.7/2.9 K/A NUMBERS:                                                        Rating: SRO/RO:
MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
A4.01                              3.1/3.0 APPLICABLE METHOD OF TESTING:
STARTUP THE RWCU SYSTEM JPM NUMBER:
Discussion:                 Simulate/walkthrough:               Perform:
JPM-B.02.02-001 REV.
EVALUATION LOCATION:             In-Plant:                             Control Room:
11 RELATED PRA INFORMATION:
Simulator:                             Other:
None TASK NUMBERS /
TASK TITLE(S):
CR204.102; NL204.101; NL204.105 Place RWCU System In Service with No. 11 RWCU Pump and 11 RWCU Filter/Demineralizer In Service K/A NUMBERS:
204000 A2.04 A4.01 Rating: SRO/RO:
2.7/2.9 3.1/3.0 APPLICABLE METHOD OF TESTING:
Discussion:
Simulate/walkthrough:
Perform:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Other:
Lab:
Lab:
Time for Completion:         10       Minutes                   Time Critical:     No Alternate Path:               No TASK APPLICABILITY:               SRO:             RO:             NLO Additional site-specific signatures may be added as desired.
Time for Completion:
10 Minutes Time Critical:
No Alternate Path:
No TASK APPLICABILITY:
SRO:
RO:
NLO Additional site-specific signatures may be added as desired.
Developed by:
Developed by:
Developer                                   Date Validated by:
Developer Date Validated by:
Validator                                 Date (See JPM Validation Checklist, Attachment 1)
Validator (See JPM Validation Checklist, Attachment 1)
Approved by:
Date Approved by:
Training Supervisor                             Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Training Supervisor Date  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                         Page 2 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 2 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 180: Line 274:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* The Reactor is Shutdown and Reactor coolant temperature is <212&deg;F. Preparation for a plant startup is in progress. The RWCU system is ready for operation.
The Reactor is Shutdown and Reactor coolant temperature is <212&deg;F. Preparation for a plant startup is in progress. The RWCU system is ready for operation.
* No. 12 RWCU Filter is being backwashed and will be put in service later.
No. 12 RWCU Filter is being backwashed and will be put in service later.
* The RWCU pumps and heat exchangers are filled and vented. RBCCW and Service Air Systems are operating properly.
The RWCU pumps and heat exchangers are filled and vented. RBCCW and Service Air Systems are operating properly.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
* The Control Room Supervisor directs you to place RWCU system in service by performing STEPS 12 and 13 of the RWCU system startup procedure B.02.02-05.D.1.
The Control Room Supervisor directs you to place RWCU system in service by performing STEPS 12 and 13 of the RWCU system startup procedure B.02.02-05.D.1.
* Use No. 11 RWCU pump and No. 11 Filter.
Use No. 11 RWCU pump and No. 11 Filter.
* All required steps prior to STEP 12 have been successfully completed.
All required steps prior to STEP 12 have been successfully completed.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 3 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 10 JPM PERFORMANCE INFORMATION Required Materials:         Full Scope Simulator General  
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 3 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM PERFORMANCE INFORMATION Required Materials:
Full Scope Simulator General  


==References:==
==References:==
B.02.02-05 Task Standards:             Startup the RWCU System Start Time:
B.02.02-05 Task Standards:
Startup the RWCU System Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Performance Step: 1             Locate procedure B.02.02-05 D.1. (System Startup During Shutdown or Refueling).
Performance Step: 1 Locate procedure B.02.02-05 D.1. (System Startup During Shutdown or Refueling).
Standard:                       Locates appropriate procedure and steps.
Standard:
Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
Locates appropriate procedure and steps.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 4 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Performance Step: 2             (Procedure STEP 12)
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical Y CAUTION Step 13 must be performed immediately following step 12.
Page 4 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 2 Critical Y (Procedure STEP 12)
CAUTION Step 13 must be performed immediately following step 12.
START a reactor water cleanup pump using the Pump A or Pump B switch for the desired pump.
START a reactor water cleanup pump using the Pump A or Pump B switch for the desired pump.
Standard:                       Starts 11 RWCU pump using HS-12A-S5, and after a 3 second delay notices the pump trips. Notifies Control Room Supervisor.
Standard:
Evaluator Cue:                 Control Room Supervisor notifies operator that an investigation will be started and to start the 12 RWCU pump.
Starts 11 RWCU pump using HS-12A-S5, and after a 3 second delay notices the pump trips. Notifies Control Room Supervisor.
Evaluator Note:                 Do NOT give cue if operator does not notify the Control Room Supervisor.
Evaluator Cue:
Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
Control Room Supervisor notifies operator that an investigation will be started and to start the 12 RWCU pump.
Performance Step: 3             (Procedure STEP 12)
Evaluator Note:
Critical Y CAUTION Step 13 must be performed immediately following step 12.
Do NOT give cue if operator does not notify the Control Room Supervisor.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 3 Critical Y (Procedure STEP 12)
CAUTION Step 13 must be performed immediately following step 12.
START a reactor water cleanup pump using the Pump A or Pump B switch for the desired pump.
START a reactor water cleanup pump using the Pump A or Pump B switch for the desired pump.
Standard:                       Starts 12 RWCU pump using HS-12A-S6 and observes CLEANUP PUMP DISCH pressure rising as indicated on PI-12-131.
Standard:
Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
Starts 12 RWCU pump using HS-12A-S6 and observes CLEANUP PUMP DISCH pressure rising as indicated on PI-12-131.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                 Page 5 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Performance Step: 4             (Procedure STEP 13)
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical N NOTE 1: The AIR-TO-LOCK- GAUGE will indicate about 3 psig when the valve starts to open.
Page 5 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 4 Critical N (Procedure STEP 13)
NOTE 1: The AIR-TO-LOCK-GAUGE will indicate about 3 psig when the valve starts to open.
NOTE 2: At flow >35 gpm the HOLDING PUMP will trip and AO-12-4-37A will close.
NOTE 2: At flow >35 gpm the HOLDING PUMP will trip and AO-12-4-37A will close.
NOTE 3: Step 13 is to be performed while in communication with the control room.
NOTE 3: Step 13 is to be performed while in communication with the control room.
At Panel C-82, slowly turn the manual regulator knob FIC-12-4-97A, to raise flow through the filter demin to 90 GPM as indicated on FI-12-141A.
At Panel C-82, slowly turn the manual regulator knob FIC-12-4-97A, to raise flow through the filter demin to 90 GPM as indicated on FI-12-141A.
Standard:                       Directs the Radwaste APEO to slowly OPEN CV-12-4-15A.
Standard:
Directs the Radwaste APEO to slowly OPEN CV-12-4-15A.
Operator should observe the following:
Operator should observe the following:
: 1. C04-B-21, CLEAN UP FILTER DEMIN FAILURE clears.
: 1.
: 2. FILTER A FLOW as indicated on FI-12-141A increases to ~90 gpm Evaluator Cue:                 CV-12-4-15A is open.
C04-B-21, CLEAN UP FILTER DEMIN FAILURE clears.
Evaluator Note:                 The RWCU pump has no minimum flow protection. If this step is not performed, pump damage will occur.
: 2.
Booth Operator INSERT TRIGGER 1 and verify flow on No. 11 RWCU F/D to rises to 90 gpm Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
FILTER A FLOW as indicated on FI-12-141A increases to ~90 gpm Evaluator Cue:
Terminating Cues:         When 12 RWCU Pump is running with F/D flow ~90 gpm, terminate the JPM.
CV-12-4-15A is open.
Evaluator Note:
The RWCU pump has no minimum flow protection. If this step is not performed, pump damage will occur.
Booth Operator INSERT TRIGGER 1 and verify flow on No. 11 RWCU F/D to rises to 90 gpm Performance:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
When 12 RWCU Pump is running with F/D flow ~90 gpm, terminate the JPM.
Stop Time:
Stop Time:
Historical Record: Updated for 2016 ILT NRC Exam Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Historical Record: Updated for 2016 ILT NRC Exam  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 6 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Simulator Setup (as required):
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 6 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Simulator Setup (as required):
: 1. This JPM can be run from the following Standard (Specific) IC sets:
: 1. This JPM can be run from the following Standard (Specific) IC sets:
* Cold Shutdown IC with RWCU secured
* Cold Shutdown IC with RWCU secured
Line 236: Line 352:


==SUMMARY==
==SUMMARY==
Manual Trigger Type Code Description Delay Ramp Value Event Trigger 1
REM RU01B 11 RWCU F/D Setpoint 00:01:00 36 MAL RU01A 11 RWCU Pump trip 00:00:03 2


Manual                                                                                                Event Trigger      Type        Code                Description                Delay      Ramp    Value    Trigger 1        REM        RU01B        11 RWCU F/D Setpoint                          00:01:00  36 MAL        RU01A          11 RWCU Pump trip              00:00:03                        2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF1075-01 Rev. 5 (FP-T-SAT-75)
 
Page 7 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 7 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS                                                                   YES NO       N/A
REVIEW STATEMENTS YES NO N/A
: 1. Are all items on the cover page filled in correctly?
: 1.
: 2. Has the JPM been reviewed and validated by SMEs?
Are all items on the cover page filled in correctly?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 2.
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
Has the JPM been reviewed and validated by SMEs?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 3.
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 4.
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 5.
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6.
If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8.
Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 9.
Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 10. Have the performance steps been identified and typed (Critical /
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
Sequence / Time Critical) appropriately?
Line 256: Line 383:
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________                  __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date  
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                             Page 8 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 ATTACHMENT 2 JPM Number: JPM-B.02.02-001 JPM Title: Startup the RWCU System Examinee & ID:                                                   Evaluator:
QF1075-01 Rev. 5 (FP-T-SAT-75)
Job Title:                                                     Date:
Page 8 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Start Time                                               Finish Time PERFORMANCE RESULTS:                                 SAT:                       UNSAT:
ATTACHMENT 2 JPM Number: JPM-B.02.02-001 JPM
 
==Title:==
Startup the RWCU System Examinee & ID:
Evaluator:
Job
 
==Title:==
Date:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                       Page 9 of 9 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
QF1075-01 Rev. 5 (FP-T-SAT-75)
* The Reactor is Shutdown and Reactor coolant temperature is <212&deg;F. Preparation for a plant startup is in progress. The RWCU system is ready for operation.
Page 9 of 9 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
* No. 12 RWCU Filter is being backwashed and will be put in service later.
ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
* The RWCU pumps and heat exchangers are filled and vented. RBCCW and Service Air Systems are operating properly.
The Reactor is Shutdown and Reactor coolant temperature is <212&deg;F. Preparation for a plant startup is in progress. The RWCU system is ready for operation.
No. 12 RWCU Filter is being backwashed and will be put in service later.
The RWCU pumps and heat exchangers are filled and vented. RBCCW and Service Air Systems are operating properly.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
* The Control Room Supervisor directs you to place RWCU system in service by performing STEPS 12 and 13 of the RWCU system startup procedure B.02.02-05.D.1.
The Control Room Supervisor directs you to place RWCU system in service by performing STEPS 12 and 13 of the RWCU system startup procedure B.02.02-05.D.1.
* Use No. 11 RWCU pump and No. 11 Filter.
Use No. 11 RWCU pump and No. 11 Filter.
* All required steps prior to STEP 12 have been successfully completed.INFORM EVALUATOR WHEN YOU HAVE COMPLETED THE TASK!
All required steps prior to STEP 12 have been successfully completed.INFORM EVALUATOR WHEN YOU HAVE COMPLETED THE TASK!  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)
QF1075-01 Rev. 5 (FP-T-SAT-75)
JOB PERFORMANCE MEASURE (JPM) k SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   OPEN THE MAIN STEAM LINE DRAINS FOLLOWING A GROUP 1 ISOLATION JPM NUMBER:                   JPM-C.5-3302-003                 REV.       0 RELATED PRA                   None INFORMATION:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
TASK NUMBERS /               CR239.110 TASK TITLE(S):               Open the MSIVs Following a Group 1 Isolation K/A NUMBERS:                 239001         A4.01                 Rating: SRO/RO:     4.2/4.0 APPLICABLE METHOD OF TESTING:
k JOB PERFORMANCE MEASURE (JPM)
Discussion:                 Simulate/walkthrough:               Perform:
SITE:
EVALUATION LOCATION:             In-Plant:                             Control Room:
MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
Simulator:                             Other:
OPEN THE MAIN STEAM LINE DRAINS FOLLOWING A GROUP 1 ISOLATION JPM NUMBER:
JPM-C.5-3302-003 REV.
0 RELATED PRA INFORMATION:
None TASK NUMBERS /
TASK TITLE(S):
CR239.110 Open the MSIVs Following a Group 1 Isolation K/A NUMBERS:
239001 A4.01 Rating: SRO/RO:
4.2/4.0 APPLICABLE METHOD OF TESTING:
Discussion:
Simulate/walkthrough:
Perform:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Other:
Lab:
Lab:
Time for Completion:         20       Minutes                   Time Critical:     No Alternate Path:             Yes TASK APPLICABILITY:               SRO:             RO:             NLO Additional site-specific signatures may be added as desired.
Time for Completion:
20 Minutes Time Critical:
No Alternate Path:
Yes TASK APPLICABILITY:
SRO:
RO:
NLO Additional site-specific signatures may be added as desired.
Developed by:
Developed by:
Developer                                   Date Validated by:
Developer Date Validated by:
Validator                                 Date (See JPM Validation Checklist, Attachment 1)
Validator (See JPM Validation Checklist, Attachment 1)
Approved by:
Date Approved by:
Training Supervisor                             Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Training Supervisor Date  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                       Page 2 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 2 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 303: Line 457:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* The Reactor is in hot shutdown following a Reactor Scram due to a spurious Group 1 isolation.
The Reactor is in hot shutdown following a Reactor Scram due to a spurious Group 1 isolation.
* The cause of the isolation is known and was determined to be INVALID INITIATING CUES (IF APPLICABLE):
The cause of the isolation is known and was determined to be INVALID INITIATING CUES (IF APPLICABLE):
* The CRS directs you to perform the following:
The CRS directs you to perform the following:
* Reset the Group 1 Isolation by performing Step 10 ONLY of C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION - GROUP 1) and THEN
Reset the Group 1 Isolation by performing Step 10 ONLY of C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION - GROUP 1) and THEN Restore and maintain RPV Pressure 700-750 psig IAW C.5-3302 (ALTERNATE PRESSURE CONTROL) using the Main Steam Line Drains.  
* Restore and maintain RPV Pressure 700-750 psig IAW C.5-3302 (ALTERNATE PRESSURE CONTROL) using the Main Steam Line Drains.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                           Page 3 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 JPM PERFORMANCE INFORMATION Required Materials:         Full Scope Simulator General  
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 3 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM PERFORMANCE INFORMATION Required Materials:
Full Scope Simulator General  


==References:==
==References:==
C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION - GROUP 1)
C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION - GROUP 1)
C.5-3302 (ALTERNATE PRESSURE CONTROL)
C.5-3302 (ALTERNATE PRESSURE CONTROL)
Task Standards:             Reopen the MSIVs following a Group 1 isolation Start Time:
Task Standards:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Reopen the MSIVs following a Group 1 isolation Start Time:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 4 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 4 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Performance Step: 1           Obtain and review procedures:
Performance Step: 1 Critical: N Obtain and review procedures:
Critical: N                        o C.4-B.04.01.A (Primary Containment Isolation - Group 1) o C.5-3302 (Alternate Pressure Control)
o C.4-B.04.01.A (Primary Containment Isolation - Group 1) o C.5-3302 (Alternate Pressure Control)
Standard:                     Locates appropriate procedures Evaluator Cue:                 None Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
Standard:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Locates appropriate procedures Evaluator Cue:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                             Page 5 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Performance Step: 2       C.4-B.04.01.A, STEP 10)
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: Y                When cause of isolation has been corrected, Then perform the following to allow opening of MSIVs:
Page 5 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 2 Critical: Y C.4-B.04.01.A, STEP 10)
When cause of isolation has been corrected, Then perform the following to allow opening of MSIVs:
: a. On Panel C-03, PLACE MSIV inboard handswitches in CLOSED:
: a. On Panel C-03, PLACE MSIV inboard handswitches in CLOSED:
* 16A-S1A, AO-2-80A (11 INBD MSIV)
16A-S1A, AO-2-80A (11 INBD MSIV) 16A-S1B, AO-2-80B (12 INBD MSIV) 16A-S1C, AO-2-80C (13 INBD MSIV) 16A-S1D, AO-2-80D (14 INBD MSIV)
* 16A-S1B, AO-2-80B (12 INBD MSIV)
* 16A-S1C, AO-2-80C (13 INBD MSIV)
* 16A-S1D, AO-2-80D (14 INBD MSIV)
: b. On Panel C-03, PLACE MSIV outboard handswitches in CLOSED:
: b. On Panel C-03, PLACE MSIV outboard handswitches in CLOSED:
* 16A-S2A, AO-2-86A (11 OTBD MSIV)
16A-S2A, AO-2-86A (11 OTBD MSIV) 16A-S2B, AO-2-86B (12 OTBD MSIV) 16A-S2C, AO-2-86C (13 OTBD MSIV) 16A-S2D, AO-2-86D (14 OTBD MSIV)
* 16A-S2B, AO-2-86B (12 OTBD MSIV)
* 16A-S2C, AO-2-86C (13 OTBD MSIV)
* 16A-S2D, AO-2-86D (14 OTBD MSIV)
: c. On Panel C-04, VERIFY Recirc sample isolation valve handswitches in CLOSED:
: c. On Panel C-04, VERIFY Recirc sample isolation valve handswitches in CLOSED:
* 16A-S7, CV-2790 (RECIRC SX LINE INBD ISOL)
16A-S7, CV-2790 (RECIRC SX LINE INBD ISOL) 16A-S8, CV-2791 (RECIRC SX LINE OTBD ISOL)
* 16A-S8, CV-2791 (RECIRC SX LINE OTBD ISOL)
: d. On Panel C-03, VERIFY Group 1 Isolation RESET using Reset pushbuttons:
: d. On Panel C-03, VERIFY Group 1 Isolation RESET using Reset pushbuttons:
* 16A-S32A, Main Steam Isolation Reset - Inboard
16A-S32A, Main Steam Isolation Reset - Inboard 16A-S32B, Main Steam Isolation Reset - Outboard Standard:
* 16A-S32B, Main Steam Isolation Reset - Outboard Standard:                 Using C.4-B.04.01.A, candidate ensures:
Using C.4-B.04.01.A, candidate ensures:
: 1. All MSIV and sample line valve hand-switches are in the CLOSE position.
: 1. All MSIV and sample line valve hand-switches are in the CLOSE position.
: 2. Pushbuttons 16-AS32A and 16A S32B have been depressed (white light indicators above pushbutton 16A S32A and 16A-S32B are lit)
: 2. Pushbuttons 16-AS32A and 16A S32B have been depressed (white light indicators above pushbutton 16A S32A and 16A-S32B are lit)
Evaluator Cue:             None Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Evaluator Cue:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
None Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                     Page 6 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Performance Step: 3           (C.5-3302, PART B Prerequisites)
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: N                    1. Main Condenser available as Heat Sink.
Page 6 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 3 Critical: N (C.5-3302, PART B Prerequisites)
: 1. Main Condenser available as Heat Sink.
: 2. One of the following:
: 2. One of the following:
* MSIVs are OPEN OR
MSIVs are OPEN OR Group 1 Isolation reset OR bypassed Standard:
* Group 1 Isolation reset OR bypassed Standard:                     Verifies perquisites are satisfied.
Verifies perquisites are satisfied.
Evaluator Cue:                 None Performance:                   SATISFACTORY             UNSATISFACTORY Comments:
Evaluator Cue:
Performance Step: 4           (C.5-3302, PART B)
None Performance:
Critical: Y                    1. IF MSIVs are CLOSED, THEN verify the following valves are OPEN:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 4 Critical: Y (C.5-3302, PART B)
: 1. IF MSIVs are CLOSED, THEN verify the following valves are OPEN:
NOTE: MO-2373 may be throttled to control RPV pressure.
NOTE: MO-2373 may be throttled to control RPV pressure.
* MO-2564, STEAM LINE DRAIN DWNSTRM MSIVS
MO-2564, STEAM LINE DRAIN DWNSTRM MSIVS MO-2373, MAIN STEAM LINE DRAIN - INBOARD MO-2374, MAIN STEAM LINE DRAIN - OUTBOARD Standard:
* MO-2373, MAIN STEAM LINE DRAIN - INBOARD
: 1. Ensures that the following valves are OPEN:
* MO-2374, MAIN STEAM LINE DRAIN - OUTBOARD Standard:                     1. Ensures that the following valves are OPEN:
MO-2564, STEAM LINE DRAIN DWNSTRM MSIVS (Normally OPEN)
* MO-2564, STEAM LINE DRAIN DWNSTRM MSIVS (Normally OPEN)
MO-2373, MAIN STEAM LINE DRAIN - INBOARD (will be closed initially due to isolation; THROTTLABE in OPEN direction only)
* MO-2373, MAIN STEAM LINE DRAIN - INBOARD (will be closed initially due to isolation; THROTTLABE in OPEN direction only)
MO-2374, MAIN STEAM LINE DRAIN - OUTBOARD (will be closed initially due to isolation; NOT Throttlable)
* MO-2374, MAIN STEAM LINE DRAIN - OUTBOARD (will be closed initially due to isolation; NOT Throttlable)
: 2. Controls depressurization/cooldown rate by throttling MO-2373 Evaluator Cue:
: 2. Controls depressurization/cooldown rate by throttling MO-2373 Evaluator Cue:                 None Evaluator Note:               BOOTH OPERATOR: Verify Event Trigger 1 activates. This will initiate a steam leak in the Steam Chase.
None Evaluator Note:
Performance:                   SATISFACTORY             UNSATISFACTORY Comments:
BOOTH OPERATOR: Verify Event Trigger 1 activates. This will initiate a steam leak in the Steam Chase.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                           Page 7 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Performance Step: 5           ALTERNATE PATH: ARP 3-B-56 (High Area Temp Steam Leak)
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: N
Page 7 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 5 Critical: N ALTERNATE PATH: ARP 3-B-56 (High Area Temp Steam Leak)
: 1. On C-21, MONITOR area temperatures as indicated by TR-4926, Steam Leak Detection Recorder, and DETERMINE affected area(s).
: 1. On C-21, MONITOR area temperatures as indicated by TR-4926, Steam Leak Detection Recorder, and DETERMINE affected area(s).
Standard:                         1. Recognizes rising Steam Chase temperatures and notifies CRS.
Standard:
Evaluator Cue:                 When notified as CRS, acknowledge the report.
: 1. Recognizes rising Steam Chase temperatures and notifies CRS.
Performance:                   SATISFACTORY             UNSATISFACTORY Comments:
Evaluator Cue:
Performance Step: 6           ALTERNATE PATH: ARP 3-B-56 Critical: N
When notified as CRS, acknowledge the report.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 6 Critical: N ALTERNATE PATH: ARP 3-B-56
: 2. Refer to the following procedures:
: 2. Refer to the following procedures:
: a. C.4-B.02.04.A (Steam Leaks Outside Primary Containment)
: a. C.4-B.02.04.A (Steam Leaks Outside Primary Containment)
Standard:                         2. Enters C.4-B.02.04.A (Steam Leaks Outside Primary Containment)
Standard:
Evaluator Cue:                 None Performance:                   SATISFACTORY             UNSATISFACTORY Comments:
: 2. Enters C.4-B.02.04.A (Steam Leaks Outside Primary Containment)
Performance Step: 7           ALTERNATE PATH: C.4-B.02.04.A Critical: N
Evaluator Cue:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 7 Critical: N ALTERNATE PATH: C.4-B.02.04.A
: 1. EVACUATE personnel from affected area.
: 1. EVACUATE personnel from affected area.
Standard:                         1. Makes page announcement to evacuate the Reactor Building Evaluator Cue:                 None Performance:                   SATISFACTORY             UNSATISFACTORY Comments:
Standard:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
: 1. Makes page announcement to evacuate the Reactor Building Evaluator Cue:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                 Page 8 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Performance Step: 8           ALTERNATE PATH: C.4-B.02.04.A Critical: Y
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 8 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 8 Critical: Y ALTERNATE PATH: C.4-B.02.04.A
: 6. If the origin of the leak is identified, Then ISOLATE if possible.
: 6. If the origin of the leak is identified, Then ISOLATE if possible.
Standard:                         6. Closes MO-2073 and/or MO-2074 to isolate the leak Evaluator Cue:               None Evaluator Note:
Standard:
* Steps 3-5 of C.4-B.02.04.A do NOT apply for the purposes of this JPM
: 6. Closes MO-2073 and/or MO-2074 to isolate the leak Evaluator Cue:
* Examinee may also close MSIVs using C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION - GROUP 1 Performance:                 SATISFACTORY             UNSATISFACTORY Comments:
None Evaluator Note:
Performance Step: 9           ALTERNATE PATH:
Steps 3-5 of C.4-B.02.04.A do NOT apply for the purposes of this JPM Examinee may also close MSIVs using C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION - GROUP 1 Performance:
Critical: N Verifies On C-21, that the leak is isolated by monitoring steam chase temperatures.
SATISFACTORY UNSATISFACTORY Comments:
Standard:                     Verifies lowering steam chase temperatures on C-21 Evaluator Cue:               None Performance:                 SATISFACTORY             UNSATISFACTORY Comments:
Performance Step: 9 Critical: N ALTERNATE PATH:
Terminating Cues:       When the leak is isolated with MO-2073 and/or MO-2074 closed, terminate the JPM.
Verifies On C-21, that the leak is isolated by monitoring steam chase temperatures.
Standard:
Verifies lowering steam chase temperatures on C-21 Evaluator Cue:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
When the leak is isolated with MO-2073 and/or MO-2074 closed, terminate the JPM.
Stop Time:
Stop Time:
Historical Record: New Create for the 2016 ILT NRC Exam.
Historical Record: New Create for the 2016 ILT NRC Exam.  
.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 9 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Simulator Setup (as required):
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 9 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Simulator Setup (as required):
Simulator Setup Instructions:
Simulator Setup Instructions:
* Reset to any full power IC.
Reset to any full power IC.
* Initiate a Group 1 Isolation using the malfunctions listed below
Initiate a Group 1 Isolation using the malfunctions listed below Perform SCRAM Immediate Actions and EOP C.5-1100 actions to stabilize RPV water level (using FW) and pressure (using SRVs on Low-Low Set)
* Perform SCRAM Immediate Actions and EOP C.5-1100 actions to stabilize RPV water level (using FW) and pressure (using SRVs on Low-Low Set)
Set Event Trigger 1 to ZD_2374O SIMULATOR - MALFUNCTIONS:
* Set Event Trigger 1 to ZD_2374O SIMULATOR - MALFUNCTIONS:
MALF ID MALFUNCTION TITLE DELAY RAMP EVENT VALUE FINAL
MALF ID           MALFUNCTION TITLE                 DELAY         RAMP     EVENT VALUE     FINAL
: 1.
: 1. PP05A         Spurious Group 1 - Channel A1                                                   Active
PP05A Spurious Group 1 - Channel A1 Active
: 2. PP05C         Spurious Group 1 - Channel B1                                                   Active MS03           B Main Steam Line Rupture in         00:01:00                   1 Steam Tunnel SIMULATOR - REMOTE FUNCTIONS:
: 2.
REMOTE           REMOTE FUNCTION TITLE             DELAY         RAMP     EVENT VALUE     FINAL FUNC No.
PP05C Spurious Group 1 - Channel B1 Active MS03 B Main Steam Line Rupture in Steam Tunnel 00:01:00 1
: 1. PC17           Group 1 B/P C.5-3017                                               INSTLD 2.
SIMULATOR - REMOTE FUNCTIONS:
REMOTE FUNC No.
REMOTE FUNCTION TITLE DELAY RAMP EVENT VALUE FINAL
: 1.
PC17 Group 1 B/P C.5-3017 INSTLD
: 2.
SIMUALTOR - OVERRIDES:
SIMUALTOR - OVERRIDES:
OVERRIDE ID               OVERRIDE           DELAY         RAMP     EVENT VALUE     FINAL DESCRIPTION 1.
OVERRIDE ID OVERRIDE DESCRIPTION DELAY RAMP EVENT VALUE FINAL
2.
: 1.
3.
: 2.
4.
: 3.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
: 4.  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                             Page 10 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
QF1075-01 Rev. 5 (FP-T-SAT-75)
REVIEW STATEMENTS                                                                   YES NO       N/A
Page 10 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
: 1. Are all items on the cover page filled in correctly?
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
: 2. Has the JPM been reviewed and validated by SMEs?
REVIEW STATEMENTS YES NO N/A
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 1.
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
Are all items on the cover page filled in correctly?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 2.
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
Has the JPM been reviewed and validated by SMEs?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 3.
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 4.
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5.
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6.
If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8.
Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 9.
Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 10. Have the performance steps been identified and typed (Critical /
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
Sequence / Time Critical) appropriately?
Line 432: Line 625:
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________                  __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date  
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                           Page 11 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 ATTACHMENT 2 JPM Number: JPM-3302-003 JPM Title: Open the Main Steam Line Drains following a Group 1 Isolation Examinee & ID:                                                   Evaluator:
QF1075-01 Rev. 5 (FP-T-SAT-75)
Job Title:                                                     Date:
Page 11 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Start Time                                               Finish Time PERFORMANCE RESULTS:                                 SAT:                       UNSAT:
ATTACHMENT 2 JPM Number: JPM-3302-003 JPM
 
==Title:==
Open the Main Steam Line Drains following a Group 1 Isolation Examinee & ID:
Evaluator:
Job
 
==Title:==
Date:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                       Page 12 of 12 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
QF1075-01 Rev. 5 (FP-T-SAT-75)
* The Reactor is in hot shutdown following a Reactor Scram due to a spurious Group 1 isolation.
Page 12 of 12 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
* The cause of the isolation is known and was determined to be INVALID INITIATING CUES (IF APPLICABLE):
ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
* The CRS directs you to perform the following:
The Reactor is in hot shutdown following a Reactor Scram due to a spurious Group 1 isolation.
* Reset the Group 1 Isolation by performing Step 10 ONLY of C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION - GROUP 1) and THEN
The cause of the isolation is known and was determined to be INVALID INITIATING CUES (IF APPLICABLE):
* Restore and maintain RPV Pressure 700-750 psig IAW C.5-3302 (ALTERNATE PRESSURE CONTROL) using the Main Steam Line Drains.
The CRS directs you to perform the following:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Reset the Group 1 Isolation by performing Step 10 ONLY of C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION - GROUP 1) and THEN Restore and maintain RPV Pressure 700-750 psig IAW C.5-3302 (ALTERNATE PRESSURE CONTROL) using the Main Steam Line Drains.  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                 Page 1 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 JOB PERFORMANCE MEASURE (JPM)
QF1075-01 Rev. 5 (FP-T-SAT-75)
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   MANUAL SWITCHOVER OF HPCI SUCTION FROM TORUS TO CSTS JPM NUMBER:                   JPM-B.03.02-005                 REV.       0 RELATED PRA                   None INFORMATION:
Page 1 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 JOB PERFORMANCE MEASURE (JPM)
TASK NUMBERS /               CR206.115 TASK TITLE(S):               Transfer HPCI Suction from Torus to CST K/A NUMBERS:                 206000 (HPCI)         A2.04       Rating: SRO/RO:         3.7/3.7 Ability to manually operate and/or monitor in the control room:
SITE:
MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
MANUAL SWITCHOVER OF HPCI SUCTION FROM TORUS TO CSTS JPM NUMBER:
JPM-B.03.02-005 REV.
0 RELATED PRA INFORMATION:
None TASK NUMBERS /
TASK TITLE(S):
CR206.115 Transfer HPCI Suction from Torus to CST K/A NUMBERS:
206000 (HPCI)
A2.04 Rating: SRO/RO:
3.7/3.7 Ability to manually operate and/or monitor in the control room:
Major systems valves APPLICABLE METHOD OF TESTING:
Major systems valves APPLICABLE METHOD OF TESTING:
Discussion:               Simulate/walkthrough:               Perform:
Discussion:
EVALUATION LOCATION:             In-Plant:                         Control Room:
Simulate/walkthrough:
Simulator:                         Other:
Perform:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Other:
Lab:
Lab:
Time for Completion:             10     Minutes                 Time Critical:       No Alternate Path:                 No TASK APPLICABILITY:               SRO:             RO:           NLO Additional site-specific signatures may be added as desired.
Time for Completion:
10 Minutes Time Critical:
No Alternate Path:
No TASK APPLICABILITY:
SRO:
RO:
NLO Additional site-specific signatures may be added as desired.
Developed by:
Developed by:
Developer                                   Date Validated by:
Developer Date Validated by:
Validator                                   Date (See JPM Validation Checklist, Attachment 1)
Validator (See JPM Validation Checklist, Attachment 1)
Approved by:
Date Approved by:
Training Supervisor                             Date
Training Supervisor Date  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                       Page 2 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 2 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 478: Line 696:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* HPCI suction was transferred to the Torus for testing.
HPCI suction was transferred to the Torus for testing.
INITIATING CUES:
INITIATING CUES:
* The CRS directs you to transfer HPCI suction from the Torus back to the CSTs in accordance with B.03.02-05.G.3
The CRS directs you to transfer HPCI suction from the Torus back to the CSTs in accordance with B.03.02-05.G.3 INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.  
* INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 3 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 JPM PERFORMANCE INFORMATION Required Materials:       Simulator General  
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 3 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 JPM PERFORMANCE INFORMATION Required Materials:
Simulator General  


==References:==
==References:==
B.03.02-05, HPCI Task Standards:           HPCI suction switched from the Torus to the CSTs per B.03.02-05 G.3 Start Time:
B.03.02-05, HPCI Task Standards:
HPCI suction switched from the Torus to the CSTs per B.03.02-05 G.3 Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Performance Step: 1           Locates and reviews procedure B.03.02-05 G.3 (Manual Switchover of HPCI Critical N                    Suction from the Torus to the CSTs) and General Precautions Standard:
Performance Step: 1 Critical N Locates and reviews procedure B.03.02-05 G.3 (Manual Switchover of HPCI Suction from the Torus to the CSTs) and General Precautions Standard:
* Obtains and reviews procedure B.03.02-05 G.3 and General Precautions Performance:                 SATISFACTORY         UNSATISFACTORY Comments:
Obtains and reviews procedure B.03.02-05 G.3 and General Precautions Performance:
Performance Step: 2           (B.03.02-05 G.3 Step 1)
SATISFACTORY UNSATISFACTORY Comments:
Critical N Evaluate TS 3.5.1 for HPCI inoperability during the suction transfer Standard:                     Notifies CRS to evaluate TS 3.5.1 as HPCI will be inoperable during the suction transfer Evaluator Cues:
Performance Step: 2 Critical N (B.03.02-05 G.3 Step 1)
* As the CRS state that TSs have been appropriately evaluated Performance:                 SATISFACTORY         UNSATISFACTORY Comments:
Evaluate TS 3.5.1 for HPCI inoperability during the suction transfer Standard:
Notifies CRS to evaluate TS 3.5.1 as HPCI will be inoperable during the suction transfer Evaluator Cues:
As the CRS state that TSs have been appropriately evaluated Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                           Page 4 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Performance Step: 3       (B.03.02-05 G.3 Step 2)
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical Y                Place the following handswitches to CLOSE and VERIFY dual indication:
Page 4 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Performance Step: 3 Critical Y (B.03.02-05 G.3 Step 2)
* 23A-S14 MO-2061 (HPCI TORUS SUCT INBD ISOL)
Place the following handswitches to CLOSE and VERIFY dual indication:
23A-S14 MO-2061 (HPCI TORUS SUCT INBD ISOL)
Standard:
Standard:
* Places HS in Close for MO-2061 and verifies dual indication Performance:               SATISFACTORY           UNSATISFACTORY Comments:
Places HS in Close for MO-2061 and verifies dual indication Performance:
Performance Step: 4       (B.03.02-05 G.3 Step 2 Cont)
SATISFACTORY UNSATISFACTORY Comments:
Critical Y                Place the following handswitches to CLOSE and VERIFY dual indication:
Performance Step: 4 Critical Y (B.03.02-05 G.3 Step 2 Cont)
* MO-2062 (HPCI TORUS SUCT INBD OTBD)
Place the following handswitches to CLOSE and VERIFY dual indication:
MO-2062 (HPCI TORUS SUCT INBD OTBD)
Standard:
Standard:
* Places HS in Close for MO-2062 and verifies dual indication.
Places HS in Close for MO-2062 and verifies dual indication.
Performance:               SATISFACTORY           UNSATISFACTORY Comments:
Performance:
Performance Step: 5       (B.03.02-05 G.3 Step 3)
SATISFACTORY UNSATISFACTORY Comments:
Critical Y
Performance Step: 5 Critical Y (B.03.02-05 G.3 Step 3)
* Immediately verify OPEN MO-2063 (HPCI CST SUCTION)
Immediately verify OPEN MO-2063 (HPCI CST SUCTION)
Standard:
Standard:
* Verifies MO-2063 OPENS.
Verifies MO-2063 OPENS.
Performance:               SATISFACTORY           UNSATISFACTORY Comments:
Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                             Page 5 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Performance Step: 6         (B.03.02-05 G.2 Step 4)
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical N Verify fully CLOSED
Page 5 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Performance Step: 6 Critical N (B.03.02-05 G.2 Step 4)
* MO-2061
Verify fully CLOSED MO-2061 MO-2062 Standard:
* MO-2062 Standard:
Verifies both valves are fully closed Evaluator Cues:
* Verifies both valves are fully closed Evaluator Cues:             None Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
None Performance:
Performance Step: 7         (B.03.02-05 G.3 Step 5)
SATISFACTORY UNSATISFACTORY Comments:
Critical N Evaluate TS 3.5.1 for HPCI operability Standard:                   Notifies CRS to evaluate TS 3.5.1 Evaluator Cues:
Performance Step: 7 Critical N (B.03.02-05 G.3 Step 5)
* As the CRS state that TSs have been appropriately evaluated Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
Evaluate TS 3.5.1 for HPCI operability Standard:
Terminating Cues:       The candidate informs the evaluator that the task is complete.
Notifies CRS to evaluate TS 3.5.1 Evaluator Cues:
As the CRS state that TSs have been appropriately evaluated Performance:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
The candidate informs the evaluator that the task is complete.
Stop Time:
Stop Time:
Historical Record:
Historical Record:
New create for the 2016 ILT NRC Exam
New create for the 2016 ILT NRC Exam  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                       Page 6 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Simulator Setup (as required):
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 6 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Simulator Setup (as required):
: 1. This JPM can be run from the following Standard (Specific) IC sets:
: 1. This JPM can be run from the following Standard (Specific) IC sets:
* Any IC with the HPCI suction aligned to the Torus and CST level >2.5 SIMULATOR INPUT  
* Any IC with the HPCI suction aligned to the Torus and CST level >2.5 SIMULATOR INPUT  


==SUMMARY==
==SUMMARY==
Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger


Manual                                                                            Severity    Event Trigger  Type    Code            Description                Delay      Ramp    Or Value    Trigger
QF1075-01 Rev. 5 (FP-T-SAT-75)
 
Page 7 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                 Page 7 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS                                                                   YES     NO     N/A
REVIEW STATEMENTS YES NO N/A
: 1. Are all items on the cover page filled in correctly?
: 1.
: 2. Has the JPM been reviewed and validated by SMEs?
Are all items on the cover page filled in correctly?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 2.
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
Has the JPM been reviewed and validated by SMEs?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 3.
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 4.
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 5.
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6.
If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8.
Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 9.
Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 10. Have the performance steps been identified and typed (Critical /
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
Sequence / Time Critical) appropriately?
Line 551: Line 792:
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________                  __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date  
Validation Personnel /Date                 Validation Personnel/Date
 
__________________________                  __________________________
QF1075-01 Rev. 5 (FP-T-SAT-75)
Validation Personnel /Date                 Validation Personnel/Date
Page 8 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.  
__________________________                  __________________________
 
Validation Personnel /Date                 Validation Personnel/Date
QF1075-01 Rev. 5 (FP-T-SAT-75)
__________________________                  __________________________
Page 9 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Validation Personnel /Date                 Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
ATTACHMENT 2 JPM Number: JPM-B.03.02-005 JPM


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                          Page 8 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
==Title:==
Manual Switchover of HPCI Suction from Torus to CSTs Examinee & ID:
Evaluator:
Job


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                            Page 9 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 ATTACHMENT 2 JPM Number: JPM-B.03.02-005 JPM Title: Manual Switchover of HPCI Suction from Torus to CSTs Examinee & ID:                                                    Evaluator:
==Title:==
Job Title:                                                      Date:
Date:
Start Time                                               Finish Time PERFORMANCE RESULTS:                                 SAT:                       UNSAT:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                       Page 10 of 10 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
QF1075-01 Rev. 5 (FP-T-SAT-75)
* HPCI suction was transferred to the Torus for testing.
Page 10 of 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
HPCI suction was transferred to the Torus for testing.
INITIATING CUES:
INITIATING CUES:
* The CRS directs you to transfer HPCI suction from the Torus back to the CSTs in accordance with B.03.02-05.G.3
The CRS directs you to transfer HPCI suction from the Torus back to the CSTs in accordance with B.03.02-05.G.3 INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.  
* INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)
QF1075-01 Rev. 5 (FP-T-SAT-75)
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JOB PERFORMANCE MEASURE (JPM)
JOB PERFORMANCE MEASURE (JPM)
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   MANUALLY INSERT A GROUP 5 ISOLATION JPM NUMBER:                   JPM-B.02.03-011                   REV.       2 RELATED PRA                   None INFORMATION:
SITE:
TASK NUMBERS /               CR217.115 TASK TITLE(S):               Open RCIC Steam Line Isolation Valves MO-2075 and MO-2076 CR200.161 Perform the Procedure for Primary Containment Group 5 Isolation K/A NUMBERS:                 223002         A4.02                 Rating: SRO/RO:     3.8 / 3.9 APPLICABLE METHOD OF TESTING:
MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
Discussion:                 Simulate/walkthrough:               Perform:
MANUALLY INSERT A GROUP 5 ISOLATION JPM NUMBER:
EVALUATION LOCATION:             In-Plant:                             Control Room:
JPM-B.02.03-011 REV.
Simulator:                             Other:
2 RELATED PRA INFORMATION:
None TASK NUMBERS /
TASK TITLE(S):
CR217.115 Open RCIC Steam Line Isolation Valves MO-2075 and MO-2076 CR200.161 Perform the Procedure for Primary Containment Group 5 Isolation K/A NUMBERS:
223002 A4.02 Rating: SRO/RO:
3.8 / 3.9 APPLICABLE METHOD OF TESTING:
Discussion:
Simulate/walkthrough:
Perform:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Other:
Lab:
Lab:
Time for Completion:         10       Minutes                   Time Critical:     No Alternate Path:             Yes TASK APPLICABILITY:               SRO:             RO:             NLO Additional site-specific signatures may be added as desired.
Time for Completion:
10 Minutes Time Critical:
No Alternate Path:
Yes TASK APPLICABILITY:
SRO:
RO:
NLO Additional site-specific signatures may be added as desired.
Developed by:
Developed by:
Developer                                   Date Validated by:
Developer Date Validated by:
Validator                                 Date (See JPM Validation Checklist, Attachment 1)
Validator (See JPM Validation Checklist, Attachment 1)
Approved by:
Date Approved by:
Training Supervisor                             Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Training Supervisor Date  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                       Page 2 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 2 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 598: Line 865:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* Plant is operating in Mode 1.
Plant is operating in Mode 1.
* RCIC was isolated for maintenance and is in the process of being restored.
RCIC was isolated for maintenance and is in the process of being restored.
* RP has been notified.
RP has been notified.
INITIATING CUES:
INITIATING CUES:
* CRS has directed you to open MO-2075 and MO-2076 in accordance with the B.02.03-05.G.5.
CRS has directed you to open MO-2075 and MO-2076 in accordance with the B.02.03-05.G.5.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 3 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 JPM PERFORMANCE INFORMATION Required Materials:         None General  
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 3 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM PERFORMANCE INFORMATION Required Materials:
None General  


==References:==
==References:==
* B.02.03-05 (Reactor Core Isolation Cooling - System Operation), Rev. 31
B.02.03-05 (Reactor Core Isolation Cooling - System Operation), Rev. 31 C.4-B.04.01.E (Primary Containment Isolation - Group 5), Rev. 12 C.6-004-A-05 (RCIC Steam Line Hi Diff Press), Rev. 3 Task Standards:
* C.4-B.04.01.E (Primary Containment Isolation - Group 5), Rev. 12
MO-2075 and MO-2076 opened in accordance with B.02.03-05, section G.5 with the Group 5 isolation subsequently inserted in accordance with C.4-B.04.01.E.
* C.6-004-A-05 (RCIC Steam Line Hi Diff Press), Rev. 3 Task Standards:             MO-2075 and MO-2076 opened in accordance with B.02.03-05, section G.5 with the Group 5 isolation subsequently inserted in accordance with C.4-B.04.01.E.
Start Time:
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Performance Step: 1         Obtain and review Procedure B.02.03-05, Section G.5 (Opening RCIC Steam Critical: N                Line Isolation Valves MO-2075 and MO-2076).
Performance Step: 1 Critical: N Obtain and review Procedure B.02.03-05, Section G.5 (Opening RCIC Steam Line Isolation Valves MO-2075 and MO-2076).
PREREQUISITES
PREREQUISITES
: 1. No Group V isolation signal is present
: 1. No Group V isolation signal is present
: 2. RP personnel notified to address necessary controls for changing rad conditions in the RCIC Room Standard:                   Obtains and reviews correct procedure and section.
: 2. RP personnel notified to address necessary controls for changing rad conditions in the RCIC Room Standard:
Evaluator Cue:             State RP has been notified Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Obtains and reviews correct procedure and section.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Evaluator Cue:
State RP has been notified Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                             Page 4 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Performance Step: 2         Procedure Step 1.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: N VERIFY Radiation Protection personnel have addressed necessary controls for changing radiological conditions in RCIC Room.
Page 4 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Standard:                   Based on Initial Conditions, marks this step as complete.
Performance Step: 2 Critical: N Procedure Step 1.
Evaluator Cue:               If asked, INFORM Operator that RP has been notified.
VERIFY Radiation Protection personnel have addressed necessary controls for changing radiological conditions in RCIC Room.
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
Standard:
Performance Step: 3       Procedure Step 2.
Based on Initial Conditions, marks this step as complete.
Critical: N VERIFY valves CV-2082A and CV-2082B, RCIC Steam Line Drain to Main Condenser, are OPEN.
Evaluator Cue:
Standard:                 Observes RED indicating lights for CV-2082A & CV-2082B are ON and GREEN lights are OFF.
If asked, INFORM Operator that RP has been notified.
Evaluator Cue:             None Performance:               SATISFACTORY           UNSATISFACTORY Comments:
Performance:
Performance Step: 4       Procedure Step 3.
SATISFACTORY UNSATISFACTORY Comments:
Critical: Y Fully OPEN MO-2076, RCIC Steam Line Isolation Outboard.
Performance Step: 3 Critical: N Procedure Step 2.
VERIFY valves CV-2082A and CV-2082B, RCIC Steam Line Drain to Main Condenser, are OPEN.
Standard:
Observes RED indicating lights for CV-2082A & CV-2082B are ON and GREEN lights are OFF.
Evaluator Cue:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 4 Critical: Y Procedure Step 3.
Fully OPEN MO-2076, RCIC Steam Line Isolation Outboard.
: a. If MO-2076 does NOT fully OPEN and dual indication is received, Then CLOSE MO-2076.
: a. If MO-2076 does NOT fully OPEN and dual indication is received, Then CLOSE MO-2076.
: 1) Attempt to OPEN MO-2076 on additional time.
: 1) Attempt to OPEN MO-2076 on additional time.
Standard:
Standard:
* Opens MO-2076 by momentarily rotating control switch 13A-S3 CW to the OPEN position.
Opens MO-2076 by momentarily rotating control switch 13A-S3 CW to the OPEN position.
Evaluator Cue:             None Performance:               SATISFACTORY           UNSATISFACTORY Comments:
Evaluator Cue:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
None Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 5 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Performance Step: 5       Procedure Step 4.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: Y CAUTION Opening MO-2075 too fast could cause the high flow switches to isolate the steam line or cause a steam hammer.
Page 5 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 5 Critical: Y Procedure Step 4.
CAUTION Opening MO-2075 too fast could cause the high flow switches to isolate the steam line or cause a steam hammer.
JOG OPEN RCIC inboard steam line isolation valve MO-2075 to slowly pressurize the RCIC steam line.
JOG OPEN RCIC inboard steam line isolation valve MO-2075 to slowly pressurize the RCIC steam line.
Standard:
Standard:
* Jogs Open MO-2075 by momentarily rotating control switch 13A-S1 CW to the OPEN position such that the RCIC Steam Line starts to pressurize.
Jogs Open MO-2075 by momentarily rotating control switch 13A-S1 CW to the OPEN position such that the RCIC Steam Line starts to pressurize.
Non-critical Portion:
Non-critical Portion:
Reports RCIC STEAM LINE HI DIFF PRESS annunciator 4-A-05 and Reactor Building Hi Radiation annunciator 4-A-11 and refers to ARP.
Reports RCIC STEAM LINE HI DIFF PRESS annunciator 4-A-05 and Reactor Building Hi Radiation annunciator 4-A-11 and refers to ARP.
Evaluator Cue:             Floor Instructor: As CRS, ACKNOWLEDGE report.
Evaluator Cue:
Floor Instructor: As CRS, ACKNOWLEDGE report.
Simulator Operator: When RCIC steam line pressurizes to 500 psig, VERIFY TRIGGER 1 INSERTS. This causes a RCIC Steam Line rupture.
Simulator Operator: When RCIC steam line pressurizes to 500 psig, VERIFY TRIGGER 1 INSERTS. This causes a RCIC Steam Line rupture.
Performance:               SATISFACTORY           UNSATISFACTORY Comments:
Performance:
Performance Step: 6       C.6-004-A-05, Steps 1 & 2.
SATISFACTORY UNSATISFACTORY Comments:
Critical: N VERIFY automatic actions have initiated.
Performance Step: 6 Critical: N C.6-004-A-05, Steps 1 & 2.
VERIFY automatic actions have initiated.
Standard:
Standard:
* Reports that MO-2075 and MO-2076 did not auto-close.
Reports that MO-2075 and MO-2076 did not auto-close.
* Obtains and reviews Procedure C.4-B.04.01.E (Primary Containment Isolation - Group 5).
Obtains and reviews Procedure C.4-B.04.01.E (Primary Containment Isolation - Group 5).
Evaluator Note:           Operator may use the VERIFY automatic actions portion of the ARP as guidance to shut MO-2075 and MO-2076. If so, this satisfies Critical Performance Step 7 of the JPM.
Evaluator Note:
Evaluator Cue:             As CRS, ACKNOWLEDGE the report.
Operator may use the VERIFY automatic actions portion of the ARP as guidance to shut MO-2075 and MO-2076. If so, this satisfies Critical Performance Step 7 of the JPM.
Performance:               SATISFACTORY           UNSATISFACTORY Comments:
Evaluator Cue:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
As CRS, ACKNOWLEDGE the report.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                     Page 6 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Performance Step: 7       C.4-B.04.01.E, Subsequent Operator Action Step 1.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: Y VERIFY the following RCIC valves CLOSE:
Page 6 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 7 Critical: Y C.4-B.04.01.E, Subsequent Operator Action Step 1.
VERIFY the following RCIC valves CLOSE:
: a. MO-2075, RCIC Steam Supply Inbd Isol (Panel C-04)
: a. MO-2075, RCIC Steam Supply Inbd Isol (Panel C-04)
: b. MO-2076, RCIC Steam Supply Otbd Isol (Panel C-04)
: b. MO-2076, RCIC Steam Supply Otbd Isol (Panel C-04)
Standard:
Standard:
* Closes MO-2075 OR MO-2076 by momentarily rotating respective control switch 13A-S1/13A-S2 CCW to the CLOSE position.
Closes MO-2075 OR MO-2076 by momentarily rotating respective control switch 13A-S1/13A-S2 CCW to the CLOSE position.
Evaluator Note:           Since either valve will effectively isolate the leak and clear the alarm, closing either valve will satisfy the Critical Step.
Evaluator Note:
Evaluator Cue:             As CRS, ACKNOWLEDGE report and INFORM Operator another Operator will complete the remaining steps of this procedure.
Since either valve will effectively isolate the leak and clear the alarm, closing either valve will satisfy the Critical Step.
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Evaluator Cue:
Terminating Cues:         RCIC Steam Line has been isolated and RCIC STEAM LINE HI DIFF PRESS alarm 4-A-05 cleared.
As CRS, ACKNOWLEDGE report and INFORM Operator another Operator will complete the remaining steps of this procedure.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
RCIC Steam Line has been isolated and RCIC STEAM LINE HI DIFF PRESS alarm 4-A-05 cleared.
Stop Time:
Stop Time:
Historical Record: Updated for the 2016 ILT NRC Exam Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Historical Record: Updated for the 2016 ILT NRC Exam  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 7 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Simulator Setup (as required):
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 7 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Simulator Setup (as required):
: 1. This JPM can be run from the following Standard (Specific) IC sets:
: 1. This JPM can be run from the following Standard (Specific) IC sets:
* Initialize to a Mode 1 IC.
* Initialize to a Mode 1 IC.
Line 682: Line 975:
* Insert malfunctions listed in below table.
* Insert malfunctions listed in below table.
SIMULATOR - MALFUNCTIONS:
SIMULATOR - MALFUNCTIONS:
MALF ID         MALFUNCTION TITLE                     DELAY         RAMP     EVENT FINAL   VALUE
MALF ID MALFUNCTION TITLE DELAY RAMP EVENT FINAL VALUE
: 1. RC08             FAILURE OF RCIC TO AUTO               00:00:00       00:00:00   None Active   Active ISOLATE (GRP5)
: 1.
: 2. RC07             RCIC STEAM LINE LEAK                 00:00:00       00:00:00     1   100         0 SIMULATOR - REMOTE FUNCTIONS:
RC08 FAILURE OF RCIC TO AUTO ISOLATE (GRP5) 00:00:00 00:00:00 None Active Active
: 2.
RC07 RCIC STEAM LINE LEAK 00:00:00 00:00:00 1
100 0
SIMULATOR - REMOTE FUNCTIONS:
None.
None.
SIMULATOR - OVERRIDES:
SIMULATOR - OVERRIDES:
None.
None.
SIMULATOR - TRIGGERS:
SIMULATOR - TRIGGERS:
: 1. ZARCPDRN > 0.333 - RCIC Steam Line Pressure > 500 PSIG activates Trigger 1 which causes a RCIC Steam Line rupture.
: 1. ZARCPDRN > 0.333 - RCIC Steam Line Pressure > 500 PSIG activates Trigger 1 which causes a RCIC Steam Line rupture.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                 Page 8 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
QF1075-01 Rev. 5 (FP-T-SAT-75)
REVIEW STATEMENTS                                                                   YES     NO     N/A
Page 8 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
: 1. Are all items on the cover page filled in correctly?
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
: 2. Has the JPM been reviewed and validated by SMEs?
REVIEW STATEMENTS YES NO N/A
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 1.
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
Are all items on the cover page filled in correctly?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 2.
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
Has the JPM been reviewed and validated by SMEs?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 3.
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 4.
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5.
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6.
If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8.
Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 9.
Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 10. Have the performance steps been identified and typed (Critical /
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
Sequence / Time Critical) appropriately?
Line 709: Line 1,016:
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________                  __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date  
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                       Page 9 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 9 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                         Page 10 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 ATTACHMENT 2 JPM Number: JPM-B.02.03-011 JPM Title: Manually Insert a Group 5 Isolation Examinee & ID:                                                   Evaluator:
QF1075-01 Rev. 5 (FP-T-SAT-75)
Job Title:                                                     Date:
Page 10 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Start Time                                               Finish Time PERFORMANCE RESULTS:                                 SAT:                       UNSAT:
ATTACHMENT 2 JPM Number: JPM-B.02.03-011 JPM
 
==Title:==
Manually Insert a Group 5 Isolation Examinee & ID:
Evaluator:
Job
 
==Title:==
Date:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                       Page 11 of 11 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
QF1075-01 Rev. 5 (FP-T-SAT-75)
* Plant is operating in Mode 1.
Page 11 of 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
* RCIC was isolated for maintenance and is in the process of being restored.
ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
* RP has been notified.
Plant is operating in Mode 1.
RCIC was isolated for maintenance and is in the process of being restored.
RP has been notified.
INITIATING CUES:
INITIATING CUES:
* CRS has directed you to open MO-2075 and MO-2076 in accordance with the B.02.03-05.G.5.
CRS has directed you to open MO-2075 and MO-2076 in accordance with the B.02.03-05.G.5.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)
QF1075-01 Rev. 5 (FP-T-SAT-75)
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JOB PERFORMANCE MEASURE (JPM)
JOB PERFORMANCE MEASURE (JPM)
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   TURBINE-GENERATOR SYNCHRONIZATION AND LOADING JPM NUMBER:                   JPM-C.1-006                       REV.       5 RELATED PRA                   None INFORMATION:
SITE:
TASK NUMBERS /               CR200.126 TASK TITLE(S):               Synchronize and load the Turbine-Generator K/A NUMBERS:                 700000         AA2.08               Rating: SRO/RO:     4.4/4.3 APPLICABLE METHOD OF TESTING:
MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
Discussion:                 Simulate/walkthrough:               Perform:
TURBINE-GENERATOR SYNCHRONIZATION AND LOADING JPM NUMBER:
EVALUATION LOCATION:             In-Plant:                             Control Room:
JPM-C.1-006 REV.
Simulator:                             Other:
5 RELATED PRA INFORMATION:
None TASK NUMBERS /
TASK TITLE(S):
CR200.126 Synchronize and load the Turbine-Generator K/A NUMBERS:
700000 AA2.08 Rating: SRO/RO:
4.4/4.3 APPLICABLE METHOD OF TESTING:
Discussion:
Simulate/walkthrough:
Perform:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Other:
Lab:
Lab:
Time for Completion:         15       Minutes                   Time Critical:     No Alternate Path:             Yes TASK APPLICABILITY:               SRO:             RO:             NLO Additional site-specific signatures may be added as desired.
Time for Completion:
15 Minutes Time Critical:
No Alternate Path:
Yes TASK APPLICABILITY:
SRO:
RO:
NLO Additional site-specific signatures may be added as desired.
Developed by:
Developed by:
Developer                                   Date Validated by:
Developer Date Validated by:
Validator                                 Date (See JPM Validation Checklist, Attachment 1)
Validator (See JPM Validation Checklist, Attachment 1)
Approved by:
Date Approved by:
Training Supervisor                             Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Training Supervisor Date  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                       Page 2 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 2 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 757: Line 1,091:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* Reactor is in RUN at about 15% power with one and one-half bypass valves open.
Reactor is in RUN at about 15% power with one and one-half bypass valves open.
* The Main Generator is rolling at approximately 1800 rpm ready for synchronization.
The Main Generator is rolling at approximately 1800 rpm ready for synchronization.
* Main Generator Automatic Voltage Regulator is currently out of service.
Main Generator Automatic Voltage Regulator is currently out of service.
* Plant Management has authorized placing the Main Turbine -Generator on line with the Voltage Regulator in the MANUAL MODE.
Plant Management has authorized placing the Main Turbine -Generator on line with the Voltage Regulator in the MANUAL MODE.
* Procedure 2167 has been completed through step 126 Steps 121 and 125 are N/Ad due to the voltage regulator being out of service.
Procedure 2167 has been completed through step 126 Steps 121 and 125 are N/Ad due to the voltage regulator being out of service.
* Form QF-0023 (Determination for the Use of Not Applicable) for N/Aing Steps 121 and 125 have been completed in accordance with FP-G-DOC-03 (Procedure Use and Adherence).
Form QF-0023 (Determination for the Use of Not Applicable) for N/Aing Steps 121 and 125 have been completed in accordance with FP-G-DOC-03 (Procedure Use and Adherence).
INITIATING CUES:
INITIATING CUES:
* CRS directs you to synchronize and load the Main Turbine-Generator commencing with Step 127
CRS directs you to synchronize and load the Main Turbine-Generator commencing with Step 127 Another Operator will record Time and Dates Breaker 8N8 will be closed first.
* Another Operator will record Time and Dates
INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.  
* Breaker 8N8 will be closed first.
* INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 3 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 JPM PERFORMANCE INFORMATION Required Materials:         Marked up copy of 2167 (Part I) showing Steps 119, 120, 122, 123, 124 and 126 completed and Steps 121 and 125 marked as N/A.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 3 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM PERFORMANCE INFORMATION Required Materials:
Marked up copy of 2167 (Part I) showing Steps 119, 120, 122, 123, 124 and 126 completed and Steps 121 and 125 marked as N/A.
General  
General  


==References:==
==References:==
* 2167 (Plant Startup)
2167 (Plant Startup)
* C.6-008-A-11 (Main Generator Volts/Hz Trouble)
C.6-008-A-11 (Main Generator Volts/Hz Trouble)
* FP-G-DOC-03 (Procedure Use and Adherence)
FP-G-DOC-03 (Procedure Use and Adherence)
* QF-0023 (Determination for the Use of Not Applicable)
QF-0023 (Determination for the Use of Not Applicable)
Task Standards:             Main Turbine-Generator has been synchronized to the grid and loaded to ~30 MWe in accordance with 2167 with subsequent manual trip of Main Generator in accordance with C.6-008-A-11 when Voltage Regulator fails such that Generator output voltage exceeds 23.6 KV Start Time:
Task Standards:
Main Turbine-Generator has been synchronized to the grid and loaded to ~30 MWe in accordance with 2167 with subsequent manual trip of Main Generator in accordance with C.6-008-A-11 when Voltage Regulator fails such that Generator output voltage exceeds 23.6 KV Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Performance Step: 1       Obtain and review Procedure 2167 Part I (Turbine-Generator Synchronization Critical: N                and Loading).
Performance Step: 1 Critical: N Obtain and review Procedure 2167 Part I (Turbine-Generator Synchronization and Loading).
Standard:                 Reviews correct procedure and section.
Standard:
Reviews correct procedure and section.
Evaluator Cue:
Evaluator Cue:
* PROVIDE operator with Marked up copy of 2167 (Part I) showing Steps 119, 120, 122, 123, 124 and 126 completed and Steps 121 and 125 marked as N/A.
PROVIDE operator with Marked up copy of 2167 (Part I) showing Steps 119, 120, 122, 123, 124 and 126 completed and Steps 121 and 125 marked as N/A.
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Performance:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 4 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Performance Step: 2       Procedure Step 127.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: Y Place Synchronizing switch to ON, for one of Generator Output Breakers:
Page 4 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 2 Critical: Y Procedure Step 127.
Place Synchronizing switch to ON, for one of Generator Output Breakers:
* 8N7/SS, Sync Main Gen Breaker No 1
* 8N7/SS, Sync Main Gen Breaker No 1
* 8N8/SS, Sync Main Gen Breaker No 2
* 8N8/SS, Sync Main Gen Breaker No 2
: a. OBSERVE Synchronizing pointer moving.
: a. OBSERVE Synchronizing pointer moving.
: b. OBSERVE Synchronizing Voltmeters and sensing lights activated Standard:                 Place Synchronizing switch to ON, for one of Generator Output Breakers:
: b. OBSERVE Synchronizing Voltmeters and sensing lights activated Standard:
Place Synchronizing switch to ON, for one of Generator Output Breakers:
* 8N7/SS, Sync Main Gen Breaker No 1
* 8N7/SS, Sync Main Gen Breaker No 1
* 8N8/SS, Sync Main Gen Breaker No 2
* 8N8/SS, Sync Main Gen Breaker No 2
: a. OBSERVE Synchronizing pointer moving.
: a. OBSERVE Synchronizing pointer moving.
: b. OBSERVE Synchronizing Voltmeters and sensing lights activated Evaluator Cue:             If necessary repeat that 8N8 should be used for synchronizing per the turnover sheet Evaluator Note:           Per the turnover sheet 8N8 should be used for synchronizing Performance:               SATISFACTORY             UNSATISFACTORY Comments:
: b. OBSERVE Synchronizing Voltmeters and sensing lights activated Evaluator Cue:
Performance Step: 3       Procedure Step 128.
If necessary repeat that 8N8 should be used for synchronizing per the turnover sheet Evaluator Note:
Critical: Y Use SLCM, Speed Load Changer, to ADJUST the Generator speed until clockwise synchronous pointer rotation established.
Per the turnover sheet 8N8 should be used for synchronizing Performance:
Standard:                 Momentarily rotates control switch SLCM (located on Panel C-07) as necessary until synchroscope pointer (located on Panel C-08) is rotating CW.
SATISFACTORY UNSATISFACTORY Comments:
Evaluator Cue:             None Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Performance Step: 3 Critical: Y Procedure Step 128.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Use SLCM, Speed Load Changer, to ADJUST the Generator speed until clockwise synchronous pointer rotation established.
Standard:
Momentarily rotates control switch SLCM (located on Panel C-07) as necessary until synchroscope pointer (located on Panel C-08) is rotating CW.
Evaluator Cue:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 5 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Performance Step: 4       Procedure Step 129.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: Y Adjust incoming voltage to match running voltage using 270/CS, Regulator Voltage Adjust (C-08).
Page 5 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Standard:                 Momentarily rotates control switch 270/CS CW as necessary until incoming voltage approximately matches running voltage.
Performance Step: 4 Critical: Y Procedure Step 129.
Evaluator Cue:             None Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Adjust incoming voltage to match running voltage using 270/CS, Regulator Voltage Adjust (C-08).
Performance Step: 5       Procedure Step 130.
Standard:
Critical: N If speed and voltage conditions are not met, Then Repeat Steps 128 and 129 until speed and voltage conditions are met.
Momentarily rotates control switch 270/CS CW as necessary until incoming voltage approximately matches running voltage.
Standard:                 Repeats steps 128 and 129 as necessary to meet the standards indicated in Performance Steps 3 & 4.
Evaluator Cue:
Evaluator Note:           Candidate is allowed to return to Steps 128 and 129 as necessary to satisfy the standard.
None Performance:
Evaluator Cue:             None Performance:               SATISFACTORY             UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 6       Procedure Step 131.
Performance Step: 5 Critical: N Procedure Step 130.
Critical: N Allow the synchroscope to make at least two complete revolutions to verify that the synchroscope is operating properly.
If speed and voltage conditions are not met, Then Repeat Steps 128 and 129 until speed and voltage conditions are met.
Standard:                 Observes the pointer on the synchroscope has completed at least two revolutions.
Standard:
Evaluator Cue:             None Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Repeats steps 128 and 129 as necessary to meet the standards indicated in Performance Steps 3 & 4.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Evaluator Note:
Candidate is allowed to return to Steps 128 and 129 as necessary to satisfy the standard.
Evaluator Cue:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 6 Critical: N Procedure Step 131.
Allow the synchroscope to make at least two complete revolutions to verify that the synchroscope is operating properly.
Standard:
Observes the pointer on the synchroscope has completed at least two revolutions.
Evaluator Cue:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                   Page 6 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Performance Step: 7       Procedure Step 132 a.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: Y When the synchroscope pointer is in the Green Band, Then perform the following (loads the generator):
Page 6 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 7 Critical: Y Procedure Step 132 a.
When the synchroscope pointer is in the Green Band, Then perform the following (loads the generator):
: a. PLACE selected Main Generator Output Breaker (8N7 or 8N8) control switch to CLOSE and HOLD.
: a. PLACE selected Main Generator Output Breaker (8N7 or 8N8) control switch to CLOSE and HOLD.
1). When synchroscope pointer reaches 12 o-clock position, Then RELEASE Main Generator Output Breaker control switch.
1). When synchroscope pointer reaches 12 o-clock position, Then RELEASE Main Generator Output Breaker control switch.
Line 826: Line 1,183:
: a. Enter step 130 above 3). If breaker does not close on second attempt, Then DO NOT reset breaker and alarm, a) notify System Engineer.
: a. Enter step 130 above 3). If breaker does not close on second attempt, Then DO NOT reset breaker and alarm, a) notify System Engineer.
Standard:
Standard:
* Momentarily rotates control switch 8N8/CS CW to the CLOSE position such that Main Generator output breaker 8N8 closes.
Momentarily rotates control switch 8N8/CS CW to the CLOSE position such that Main Generator output breaker 8N8 closes.
* If breaker fails to close on the first attempt, momentarily rotates control switch 8N8/CS CCW to the TRIP position and returns to Step 132.
If breaker fails to close on the first attempt, momentarily rotates control switch 8N8/CS CCW to the TRIP position and returns to Step 132.
Evaluator Note:           Operator may utilize two attempts to close breaker. If operator is unsuccessful in closing the breaker after two attempts and the system engineer is contacted the operator can be informed that they may continue to attempt to close the breaker. This is if it appears that the operator has been attempting to correctly close the breaker while the synchroscope is in the green band. If the operator has been incorrectly attempting to sync the generator then mark this step as UNSAT and inform the operator that the JPM is complete Evaluator Cue:
Evaluator Note:
* Simulator Operator: When operator closes Breaker 8N8, VERIFY Trigger 1 automatically activates. This will insert the Voltage Regulator RAISE overrides which will drive Generator voltage high out of specification and prevent manual lowering of the voltage regulator.
Operator may utilize two attempts to close breaker. If operator is unsuccessful in closing the breaker after two attempts and the system engineer is contacted the operator can be informed that they may continue to attempt to close the breaker. This is if it appears that the operator has been attempting to correctly close the breaker while the synchroscope is in the green band. If the operator has been incorrectly attempting to sync the generator then mark this step as UNSAT and inform the operator that the JPM is complete Evaluator Cue:
* Simulator Operator: ROLE PLAY: If contacted as System Engineer, ACKNOWLEDGE report and INFORM operator an investigation will be promptly initiated.
Simulator Operator: When operator closes Breaker 8N8, VERIFY Trigger 1 automatically activates. This will insert the Voltage Regulator RAISE overrides which will drive Generator voltage high out of specification and prevent manual lowering of the voltage regulator.
* Floor Instructor: If operator is unsuccessful in closing the breaker after two attempts, INFORM operator JPM is complete.
Simulator Operator: ROLE PLAY: If contacted as System Engineer, ACKNOWLEDGE report and INFORM operator an investigation will be promptly initiated.
Floor Instructor: If operator is unsuccessful in closing the breaker after two attempts, INFORM operator JPM is complete.
Performance:
Performance:
SATISFACTORY             UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                 Page 7 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Performance Step: 8       Procedure Step 132.b.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: N Use SLCM, Speed Load Changer to immediately pick up 5% load (about 30 MWe).
Page 7 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 8 Critical: N Procedure Step 132.b.
Use SLCM, Speed Load Changer to immediately pick up 5% load (about 30 MWe).
Standard:
Standard:
* Momentarily rotates control switch SLCM CW to the RAISE position until Main Generator has been loaded to 25 - 35 MWe.
Momentarily rotates control switch SLCM CW to the RAISE position until Main Generator has been loaded to 25 - 35 MWe.
* Observes Generator output on the No. 1 Main Generator Megawatt meter (Panel C-08) and/or the Main Generator Megawatt LED (Panel C-07) is reading ~30 MWe.
Observes Generator output on the No. 1 Main Generator Megawatt meter (Panel C-08) and/or the Main Generator Megawatt LED (Panel C-07) is reading ~30 MWe.
Evaluator Note:
Evaluator Note:
* MWe may exceed 35 MWe due to the voltage regulator failure. This would not be considered a failure of this step.
MWe may exceed 35 MWe due to the voltage regulator failure. This would not be considered a failure of this step.
* Based on recognition of Main Generator voltage rising, this step may not be done.
Based on recognition of Main Generator voltage rising, this step may not be done.
Evaluator Cue:             None Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Evaluator Cue:
Performance Step: 9       Procedure Step 132.c.
None Performance:
Critical: N Check generator voltage and current indications are approximately equal for each phase.
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 9 Critical: N Procedure Step 132.c.
Check generator voltage and current indications are approximately equal for each phase.
Standard:
Standard:
* Observes amperage readings on the three No. 1 Main Generator Phase A/B/C Kiloamp meters (Panel C-08) are approximately equal.
Observes amperage readings on the three No. 1 Main Generator Phase A/B/C Kiloamp meters (Panel C-08) are approximately equal.
* Rotates the Phase Voltage Select Switch VS1 (Panel C-08) CW and/or CCW as necessary and observes voltage readings on all three phases are approximately equal.
Rotates the Phase Voltage Select Switch VS1 (Panel C-08) CW and/or CCW as necessary and observes voltage readings on all three phases are approximately equal.
* Should notice that voltage and MVAR readings are rising and reports this to the CRS.
Should notice that voltage and MVAR readings are rising and reports this to the CRS.
* When annunciator 8-A-11 alarms, reports alarm and pulls associated ARP.
When annunciator 8-A-11 alarms, reports alarm and pulls associated ARP.
Evaluator Cue:             Floor Instructor: If operator reports Main Generator voltage and MVAR rising and/or alarm, ACKNOWLEDGE report.
Evaluator Cue:
Floor Instructor: If operator reports Main Generator voltage and MVAR rising and/or alarm, ACKNOWLEDGE report.
Simulator Operator: When Main Generator output voltage rises to 23.1 KV, VERIFY Trigger 2 automatically activates. This will cause the Main Generator Volts/Hz Trouble annunciator (8-A-11) to alarm.
Simulator Operator: When Main Generator output voltage rises to 23.1 KV, VERIFY Trigger 2 automatically activates. This will cause the Main Generator Volts/Hz Trouble annunciator (8-A-11) to alarm.
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Performance:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 8 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Performance Step: 10       ALTERNATE PATH Critical: N               Obtain and review ARP C.6-008-A-11 (Main Generator Volts/Hz Trouble).
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 8 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 10 Critical: N ALTERNATE PATH Obtain and review ARP C.6-008-A-11 (Main Generator Volts/Hz Trouble).
Standard:
Standard:
* Announces alarm.
Announces alarm.
* Obtains and reviews correct Alarm Response Procedure.
Obtains and reviews correct Alarm Response Procedure.
Evaluator Cue:             As CRS acknowledge communication Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Evaluator Cue:
Performance Step: 11       (C.6-008-A-11) Procedure Step 1.
As CRS acknowledge communication Performance:
Critical: N Perform the following:
SATISFACTORY UNSATISFACTORY Comments:
Standard:                  Starts to perform Step 1 of ARP.
Performance Step: 11 Critical: N (C.6-008-A-11) Procedure Step 1.
Evaluator Cue:            When operator starts to perform Step 1 of the ARP, INFORM him another operator has completed Step 1.
Perform the following:
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 12      (C.6-008-A-11) Procedure Step 2.
Critical: N If the Generator is ON-LINE, Then reduce excitation to lower generator output voltage to < 23.1 KV.
Standard:
Standard:
* Momentarily rotates control switch 270/CS CCW to the LOWER position.
Starts to perform Step 1 of ARP.
* Observes no response from the Voltage Regulator.
Evaluator Cue:
* Observes Main Generator voltage and MVARs continue to rise.
When operator starts to perform Step 1 of the ARP, INFORM him another operator has completed Step 1.
Evaluator Cue:             As CRS acknowledge communication Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Performance:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 12 Critical: N (C.6-008-A-11) Procedure Step 2.
If the Generator is ON-LINE, Then reduce excitation to lower generator output voltage to < 23.1 KV.
Standard:
Momentarily rotates control switch 270/CS CCW to the LOWER position.
Observes no response from the Voltage Regulator.
Observes Main Generator voltage and MVARs continue to rise.
Evaluator Cue:
As CRS acknowledge communication Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                   Page 9 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Performance Step: 13       (C.6-008-A-11) Procedure Step 2.a.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: Y If actions taken to lower output voltage are not effective, And Generator output voltage is 23.6 KV, Then trip the Generator using the GENERATOR EMERGENCY TRIP handswitch. (C-08).
Page 9 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 13 Critical: Y (C.6-008-A-11) Procedure Step 2.a.
If actions taken to lower output voltage are not effective, And Generator output voltage is 23.6 KV, Then trip the Generator using the GENERATOR EMERGENCY TRIP handswitch. (C-08).
Standard:
Standard:
* Momentarily rotates control switch GT/CS CW or CCW to the TRIP position.
Momentarily rotates control switch GT/CS CW or CCW to the TRIP position.
Evaluator Cue:
Evaluator Cue:
* Floor Instructor: As CRS, ACKNOWLEDGE report.
Floor Instructor: As CRS, ACKNOWLEDGE report.
* Floor Instructor: When operator trips the Main Generator, INFORM him another operator will complete remaining portions of procedures.
Floor Instructor: When operator trips the Main Generator, INFORM him another operator will complete remaining portions of procedures.
* Simulator Operator: When Operator trips Main Generator, VERIFY Triggers 3 and/or 4 automatically activate. This will delete the Main Generator voltage indication override.
Simulator Operator: When Operator trips Main Generator, VERIFY Triggers 3 and/or 4 automatically activate. This will delete the Main Generator voltage indication override.
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Performance:
Terminating Cues:         When the Main Generator is manually tripped inform the operator that the JPM is complete Stop Time:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
When the Main Generator is manually tripped inform the operator that the JPM is complete Stop Time:
Historical Record:
Historical Record:
Updated for 2167 Revision 94 and 2016 ILT NRC Exam Removed Performance Steps for 2167 that are not performed due to the alternate path Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Updated for 2167 Revision 94 and 2016 ILT NRC Exam Removed Performance Steps for 2167 that are not performed due to the alternate path  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 10 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Simulator Setup (as required):
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 10 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Simulator Setup (as required):
: 1. This JPM can be run from the following Standard (Specific) IC sets:
: 1. This JPM can be run from the following Standard (Specific) IC sets:
* Initialize to a startup IC-171 or IC with Reactor Power at ~15% and Turbine at ~1800 RPM and ready for synchronization.
Initialize to a startup IC-171 or IC with Reactor Power at ~15% and Turbine at ~1800 RPM and ready for synchronization.
* Ensure the AUTO/MAN REGULATOR SELECTOR switch is in the MAN position with the WHITE light ON.
Ensure the AUTO/MAN REGULATOR SELECTOR switch is in the MAN position with the WHITE light ON.
* Ensure the Power Stabilizer is removed from service.
Ensure the Power Stabilizer is removed from service.
* Acknowledge alarm 8-A-31 (Voltage Regulator Manual Mode) and hang caution tag on the AUTO/MAN REGULATOR SELECTOR switch.
Acknowledge alarm 8-A-31 (Voltage Regulator Manual Mode) and hang caution tag on the AUTO/MAN REGULATOR SELECTOR switch.
* Adjust Voltage Regulator and Speed/Load Changer as necessary such that incoming voltage is ~2 volts less than running voltage and synchroscope is moving slowly in the counterclockwise direction.
Adjust Voltage Regulator and Speed/Load Changer as necessary such that incoming voltage is ~2 volts less than running voltage and synchroscope is moving slowly in the counterclockwise direction.
* Ensure the Turbine Speed & Bypass Valve Cam Position recorder is selected for the Turbine Speed display.
Ensure the Turbine Speed & Bypass Valve Cam Position recorder is selected for the Turbine Speed display.
* Insert malfunctions & triggers listed in below tables.
Insert malfunctions & triggers listed in below tables.
SIMULATOR - MALFUNCTIONS:
SIMULATOR - MALFUNCTIONS:
MALF ID         MALFUNCTION TITLE                       DELAY       RAMP     EVENT   FINAL   VALUE
MALF ID MALFUNCTION TITLE DELAY RAMP EVENT FINAL VALUE
: 1. C-08-A11 MAIN GENERATOR VOLTZ/HZ                           00:00:00     00:00:00   2     Active InActive TROUBLE SIMULATOR - REMOTE FUNCTIONS:
: 1.
C-08-A11 MAIN GENERATOR VOLTZ/HZ TROUBLE 00:00:00 00:00:00 2
Active InActive SIMULATOR - REMOTE FUNCTIONS:
None SIMULATOR - OVERRIDES:
None SIMULATOR - OVERRIDES:
OVR ID         MALFUNCTION TITLE                       DELAY       RAMP     EVENT   FINAL   VALUE
OVR ID MALFUNCTION TITLE DELAY RAMP EVENT FINAL VALUE
: 1. 05-S069- MANUAL VOLTAGE ADJUST -                       00:00:00     00:00:00   1     True     False 02              RAISE (DELETE IN 5 SECONDS)
: 1.
: 2. 05-S069- MANUAL VOLTAGE ADJUST -                       00:00:07     00:00:00   1     True     False 02              RAISE (DELETE IN 5 SECONDS)
05-S069-02 MANUAL VOLTAGE ADJUST -
: 3. 05-S069- MANUAL VOLTAGE ADJUST -                       00:00:14     00:00:00   1     True     False 02              RAISE (DELETE IN 5 SECONDS)
RAISE (DELETE IN 5 SECONDS) 00:00:00 00:00:00 1
: 4. 05-S069- MANUAL VOLTAGE ADJUST -                       00:00:21     00:00:00   1     True     False 02              RAISE (DELETE IN 5 SECONDS)
True False
: 5. 05-S069- MANUAL VOLTAGE ADJUST -                       00:00:28     00:00:00   1     True     False 02              RAISE (DELETE IN 5 SECONDS)
: 2.
: 6. 05-S069- MANUAL VOLTAGE ADJUST -                       00:00:35     00:00:00   1     True     False 02              RAISE (DELETE IN 5 SECONDS)
05-S069-02 MANUAL VOLTAGE ADJUST -
: 7. 05-S069- MANUAL VOLTAGE ADJUST -                       00:00:42     00:00:00   1     True     False 02              RAISE (DELETE IN 5 SECONDS)
RAISE (DELETE IN 5 SECONDS) 00:00:07 00:00:00 1
: 8. 05-S069- MANUAL VOLTAGE ADJUST -                       00:00:49     00:00:00   1     True     False 02              RAISE (DELETE IN 5 SECONDS)
True False
: 9. 05-S069- MANUAL VOLTAGE ADJUST -                       00:00:56     00:00:00   1     True     False 02              RAISE (DELETE IN 5 SECONDS)
: 3.
: 10. 05-S069- MANUAL VOLTAGE ADJUST -                         00:01:03     00:00:00   1     True     False 02              RAISE (DELETE IN 5 SECONDS)
05-S069-02 MANUAL VOLTAGE ADJUST -
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
RAISE (DELETE IN 5 SECONDS) 00:00:14 00:00:00 1
True False
: 4.
05-S069-02 MANUAL VOLTAGE ADJUST -
RAISE (DELETE IN 5 SECONDS) 00:00:21 00:00:00 1
True False
: 5.
05-S069-02 MANUAL VOLTAGE ADJUST -
RAISE (DELETE IN 5 SECONDS) 00:00:28 00:00:00 1
True False
: 6.
05-S069-02 MANUAL VOLTAGE ADJUST -
RAISE (DELETE IN 5 SECONDS) 00:00:35 00:00:00 1
True False
: 7.
05-S069-02 MANUAL VOLTAGE ADJUST -
RAISE (DELETE IN 5 SECONDS) 00:00:42 00:00:00 1
True False
: 8.
05-S069-02 MANUAL VOLTAGE ADJUST -
RAISE (DELETE IN 5 SECONDS) 00:00:49 00:00:00 1
True False
: 9.
05-S069-02 MANUAL VOLTAGE ADJUST -
RAISE (DELETE IN 5 SECONDS) 00:00:56 00:00:00 1
True False
: 10.
05-S069-02 MANUAL VOLTAGE ADJUST -
RAISE (DELETE IN 5 SECONDS) 00:01:03 00:00:00 1
True False  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                             Page 11 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 OVR ID       MALFUNCTION TITLE                       DELAY       RAMP     EVENT FINAL   VALUE
QF1075-01 Rev. 5 (FP-T-SAT-75)
: 11. 05-S069-     MANUAL VOLTAGE ADJUST -                 00:01:10 00:00:00       1   True     False 02            RAISE (DELETE IN 5 SECONDS)
Page 11 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
: 12. 05-S069-     MANUAL VOLTAGE ADJUST -                 00:01:17 00:00:00       1   True     False 02            RAISE (DELETE IN 5 SECONDS)
OVR ID MALFUNCTION TITLE DELAY RAMP EVENT FINAL VALUE
: 13. 05-S069-     MANUAL VOLTAGE ADJUST -                 00:01:24 00:00:00       1   True     False 02            RAISE (DELETE IN 5 SECONDS)
: 11.
: 14. 05-S069-     MANUAL VOLTAGE ADJUST -                 00:01:31 00:00:00       1   True     False 02            RAISE (DELETE IN 5 SECONDS)
05-S069-02 MANUAL VOLTAGE ADJUST -
: 15. 05-S069-     MANUAL VOLTAGE ADJUST -                 00:01:38 00:00:00       1   True     False 02            RAISE (DELETE IN 5 SECONDS)
RAISE (DELETE IN 5 SECONDS) 00:01:10 00:00:00 1
: 16. 05-S069-     MANUAL VOLTAGE ADJUST -                 00:01:45 00:00:00       1   True     False 02            RAISE (DELETE IN 5 SECONDS)
True False
: 17. 05-S069-     MANUAL VOLTAGE ADJUST -                 00:00:00 00:00:00       1   False     False 01            LOWER SIMULATOR - TRIGGERS:
: 12.
: 1. ZL_8N5R2 - Breaker 8N8 breaker closed RED lamp LIT ACTIVATES Trigger 1. This inserts a series of overrides to the Voltage Regulator manual adjustment such that Main Generator output voltage rises and prevents manual lowering of the Voltage Regulator.
05-S069-02 MANUAL VOLTAGE ADJUST -
: 2. ZAVMMG > 0.75 - Main Generator output voltage rising to 23.1 KV ACTIVATES Trigger 2. This causes the Main Generator Volts/Hz Trouble annunciator (8-A-11) to alarm.
RAISE (DELETE IN 5 SECONDS) 00:01:17 00:00:00 1
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
True False
: 13.
05-S069-02 MANUAL VOLTAGE ADJUST -
RAISE (DELETE IN 5 SECONDS) 00:01:24 00:00:00 1
True False
: 14.
05-S069-02 MANUAL VOLTAGE ADJUST -
RAISE (DELETE IN 5 SECONDS) 00:01:31 00:00:00 1
True False
: 15.
05-S069-02 MANUAL VOLTAGE ADJUST -
RAISE (DELETE IN 5 SECONDS) 00:01:38 00:00:00 1
True False
: 16.
05-S069-02 MANUAL VOLTAGE ADJUST -
RAISE (DELETE IN 5 SECONDS) 00:01:45 00:00:00 1
True False
: 17.
05-S069-01 MANUAL VOLTAGE ADJUST -
LOWER 00:00:00 00:00:00 1
False False SIMULATOR - TRIGGERS:
: 1.
ZL_8N5R2 - Breaker 8N8 breaker closed RED lamp LIT ACTIVATES Trigger 1. This inserts a series of overrides to the Voltage Regulator manual adjustment such that Main Generator output voltage rises and prevents manual lowering of the Voltage Regulator.
: 2.
ZAVMMG > 0.75 - Main Generator output voltage rising to 23.1 KV ACTIVATES Trigger 2. This causes the Main Generator Volts/Hz Trouble annunciator (8-A-11) to alarm.  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                             Page 12 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
QF1075-01 Rev. 5 (FP-T-SAT-75)
REVIEW STATEMENTS                                                                   YES NO       N/A
Page 12 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
: 1. Are all items on the cover page filled in correctly?
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
: 2. Has the JPM been reviewed and validated by SMEs?
REVIEW STATEMENTS YES NO N/A
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 1.
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
Are all items on the cover page filled in correctly?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 2.
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
Has the JPM been reviewed and validated by SMEs?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 3.
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 4.
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5.
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6.
If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8.
Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 9.
Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 10. Have the performance steps been identified and typed (Critical /
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
Sequence / Time Critical) appropriately?
Line 944: Line 1,386:
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________                  __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date  
Validation Personnel /Date                 Validation Personnel/Date
 
__________________________                  __________________________
QF1075-01 Rev. 5 (FP-T-SAT-75)
Validation Personnel /Date                 Validation Personnel/Date
Page 13 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
__________________________                  __________________________
ATTACHMENT 2 JPM Number: JPM-C.1-006 JPM
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                          Page 13 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 ATTACHMENT 2 JPM Number: JPM-C.1-006 JPM Title: Turbine-Generator Synchronization and Loading Examinee & ID:                                                   Evaluator:
==Title:==
Job Title:                                                     Date:
Turbine-Generator Synchronization and Loading Examinee & ID:
Start Time                                               Finish Time PERFORMANCE RESULTS:                                 SAT:                       UNSAT:
Evaluator:
Job
 
==Title:==
Date:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                       Page 14 of 14 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
QF1075-01 Rev. 5 (FP-T-SAT-75)
* Reactor is in RUN at about 15% power with one and one-half bypass valves open.
Page 14 of 14 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
* The Main Generator is rolling at approximately 1800 rpm ready for synchronization.
ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
* Main Generator Automatic Voltage Regulator is currently out of service.
Reactor is in RUN at about 15% power with one and one-half bypass valves open.
* Plant Management has authorized placing the Main Turbine -Generator on line with the Voltage Regulator in the MANUAL MODE.
The Main Generator is rolling at approximately 1800 rpm ready for synchronization.
* Procedure 2167 has been completed through step 126 Steps 121 and 125 are N/Ad due to the voltage regulator being out of service.
Main Generator Automatic Voltage Regulator is currently out of service.
* Form QF-0023 (Determination for the Use of Not Applicable) for N/Aing Steps 121 and 125 have been completed in accordance with FP-G-DOC-03 (Procedure Use and Adherence).
Plant Management has authorized placing the Main Turbine -Generator on line with the Voltage Regulator in the MANUAL MODE.
Procedure 2167 has been completed through step 126 Steps 121 and 125 are N/Ad due to the voltage regulator being out of service.
Form QF-0023 (Determination for the Use of Not Applicable) for N/Aing Steps 121 and 125 have been completed in accordance with FP-G-DOC-03 (Procedure Use and Adherence).
INITIATING CUES:
INITIATING CUES:
* CRS directs you to synchronize and load the Main Turbine-Generator commencing with Step 127
CRS directs you to synchronize and load the Main Turbine-Generator commencing with Step 127 Another Operator will record Time and Dates Breaker 8N8 will be closed first.
* Another Operator will record Time and Dates
INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.  
* Breaker 8N8 will be closed first.
* INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)
QF1075-01 Rev. 5 (FP-T-SAT-75)
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JOB PERFORMANCE MEASURE (JPM)
JOB PERFORMANCE MEASURE (JPM)
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   PERFORM THE AREA RADIATION MONITOR FUNCTIONAL TEST JPM NUMBER:                   JPM-B.05.12-001                   REV.       3 RELATED PRA                   None INFORMATION:
SITE:
TASK NUMBERS /               CR272.102 TASK TITLE(S):               Perform the Area Radiation Monitor Functional Test K/A NUMBERS:                 272000         A4.02                 Rating: SRO/RO:     3.0/3.0 APPLICABLE METHOD OF TESTING:
MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
Discussion:                 Simulate/walkthrough:               Perform:
PERFORM THE AREA RADIATION MONITOR FUNCTIONAL TEST JPM NUMBER:
EVALUATION LOCATION:             In-Plant:                             Control Room:
JPM-B.05.12-001 REV.
Simulator:                             Other:
3 RELATED PRA INFORMATION:
None TASK NUMBERS /
TASK TITLE(S):
CR272.102 Perform the Area Radiation Monitor Functional Test K/A NUMBERS:
272000 A4.02 Rating: SRO/RO:
3.0/3.0 APPLICABLE METHOD OF TESTING:
Discussion:
Simulate/walkthrough:
Perform:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Other:
Lab:
Lab:
Time for Completion:         25       Minutes                   Time Critical:     No Alternate Path:               No TASK APPLICABILITY:               SRO:             RO:             NLO Additional site-specific signatures may be added as desired.
Time for Completion:
25 Minutes Time Critical:
No Alternate Path:
No TASK APPLICABILITY:
SRO:
RO:
NLO Additional site-specific signatures may be added as desired.
Developed by:
Developed by:
Developer                                   Date Validated by:
Developer Date Validated by:
Validator                                 Date (See JPM Validation Checklist, Attachment 1)
Validator (See JPM Validation Checklist, Attachment 1)
Approved by:
Date Approved by:
Training Supervisor                             Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Training Supervisor Date  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                       Page 2 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 2 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 996: Line 1,462:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* Plant is operating at 100% power.
Plant is operating at 100% power.
* Maintenance was performed on ARM Channel A1 and it requires PMT.
Maintenance was performed on ARM Channel A1 and it requires PMT.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
* The CRS has directed you to perform Test 1025-A (Area Radiation Monitor Functional), Steps 1, 2, 4 and 6 for ONLY Channel A1.
The CRS has directed you to perform Test 1025-A (Area Radiation Monitor Functional), Steps 1, 2, 4 and 6 for ONLY Channel A1.
* The Evaluator will act as the second operator Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
The Evaluator will act as the second operator  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                 Page 3 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 JPM PERFORMANCE INFORMATION Required Materials:         Copy of Test 1025-A (Area Radiation Monitor Functional)
QF1075-01 Rev. 5 (FP-T-SAT-75)
* Initiating Approval to commence
Page 3 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
* In the comments state the performance of this test is for ONLY Detector A1 to satisfy PMT following maintenance.
JPM PERFORMANCE INFORMATION Required Materials:
* Check other as the reason for performing.
Copy of Test 1025-A (Area Radiation Monitor Functional)
* STEPS 3, 5, and 7-11 should be marked N/A General  
Initiating Approval to commence In the comments state the performance of this test is for ONLY Detector A1 to satisfy PMT following maintenance.
Check other as the reason for performing.
STEPS 3, 5, and 7-11 should be marked N/A General  


==References:==
==References:==
* Ops Manual B.05.12
Ops Manual B.05.12 ARM Alarm Setpoint Sheet (Operator Aid posted on panel)
* ARM Alarm Setpoint Sheet (Operator Aid posted on panel)
Task Standards:
Task Standards:             Test 1025-A (Area Radiation Monitor Functional)
Test 1025-A (Area Radiation Monitor Functional)
Start Time:
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Performance Step: 1 Obtains copy of Test 1025-A, APRM Functional Critical: N Standard:                 Obtains copy of Test 1025-A, most recent revision.
Performance Step: 1 Critical: N Obtains copy of Test 1025-A, APRM Functional Standard:
Evaluator Cue:           Provides an initiated copy of the current revision of Test 1025-A.
Obtains copy of Test 1025-A, most recent revision.
Performance:             SATISFACTORY             UNSATISFACTORY Comments:
Evaluator Cue:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Provides an initiated copy of the current revision of Test 1025-A.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                   Page 4 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Performance Step: 2         Procedure Step 1:
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: N                If local alarms/indication will be affected during performance of this test, And personnel will NOT be present at the local alarms/indication, Then announce over the page that Area Radiation Monitor testing will begin.
Page 4 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Standard:                   Makes plant announcement Evaluator Note:             This step should be simulated to minimize simulator distractions.
Performance Step: 2 Critical: N Procedure Step 1:
Evaluator Cue:             State that the plant announcement has been made.
If local alarms/indication will be affected during performance of this test, And personnel will NOT be present at the local alarms/indication, Then announce over the page that Area Radiation Monitor testing will begin.
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Standard:
Performance Step: 3         Procedure Step 2.a:
Makes plant announcement Evaluator Note:
Critical: N                Turn the TRIP CHECK ADJUST knob on the power supply fully counter-clockwise, And then 1/4 turn clockwise.
This step should be simulated to minimize simulator distractions.
Standard:                   Turn the TRIP AND ADJUST knob on the power supply fully counter-clockwise, And then 1/4 turn clockwise.
Evaluator Cue:
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
State that the plant announcement has been made.
Performance Step: 4         Procedure Step 2.b:
Performance:
Critical: Y                While depressing TRIP CHECK button on Indicator and Trip unit being tested, turn TRIP CHECK ADJUST knob on corresponding power supply unit slowly counter-clockwise until the downscale trip occurs.
SATISFACTORY UNSATISFACTORY Comments:
Standard:                   Simultaneously depress the TRIP CHECK button on the Indicator and Trip unit And turn the TRIP CHECK ADJUST knob on the power supply unit slowly counter-clockwise until the downscale trip occurs.
Performance Step: 3 Critical: N Procedure Step 2.a:
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Turn the TRIP CHECK ADJUST knob on the power supply fully counter-clockwise, And then 1/4 turn clockwise.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Standard:
Turn the TRIP AND ADJUST knob on the power supply fully counter-clockwise, And then 1/4 turn clockwise.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 4 Critical: Y Procedure Step 2.b:
While depressing TRIP CHECK button on Indicator and Trip unit being tested, turn TRIP CHECK ADJUST knob on corresponding power supply unit slowly counter-clockwise until the downscale trip occurs.
Standard:
Simultaneously depress the TRIP CHECK button on the Indicator and Trip unit And turn the TRIP CHECK ADJUST knob on the power supply unit slowly counter-clockwise until the downscale trip occurs.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 5 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Performance Step: 5       Procedure Step 2.c:
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: N                Record the recorder reading at which the downscale trip occurred in the column labeled mr/hr under SECTION I of Figure 1 (Acceptance Range +
Page 5 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 5 Critical: N Procedure Step 2.c:
Record the recorder reading at which the downscale trip occurred in the column labeled mr/hr under SECTION I of Figure 1 (Acceptance Range +
30%).
30%).
Standard:                 Record the recorder reading (0.1 to 0.13) at which the downscale trip occurred in the column labeled mr/hr under SECTION I of Figure 1.
Standard:
Evaluator Cue:             When examinee requests the reading on the paperless digital recorder, state that it reads the same as the meter being adjusted.
Record the recorder reading (0.1 to 0.13) at which the downscale trip occurred in the column labeled mr/hr under SECTION I of Figure 1.
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Evaluator Cue:
Performance Step: 6       Procedure Step 2.d:
When examinee requests the reading on the paperless digital recorder, state that it reads the same as the meter being adjusted.
Critical: N                Verify that the downscale alarm light on the Indicator and Trip unit is ON by recording initials in the column labeled LT under SECTION I of Figure 1.
Performance:
Standard:                 Records initials under LT column.
SATISFACTORY UNSATISFACTORY Comments:
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Performance Step: 6 Critical: N Procedure Step 2.d:
Performance Step: 7         Procedure Step 2.e:
Verify that the downscale alarm light on the Indicator and Trip unit is ON by recording initials in the column labeled LT under SECTION I of Figure 1.
Critical: N                Verify that annunciator 4-A-31 (Area Monitor Downscale) is in ALARM by recording initials in the column labeled ANN under SECTION I of Figure 1.
Standard:
Standard:                   Records initials.
Records initials under LT column.
Evaluator Cue:             State that 4-A-31 is in alarm.
Performance:
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 7 Critical: N Procedure Step 2.e:
Verify that annunciator 4-A-31 (Area Monitor Downscale) is in ALARM by recording initials in the column labeled ANN under SECTION I of Figure 1.
Standard:
Records initials.
Evaluator Cue:
State that 4-A-31 is in alarm.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                   Page 6 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Performance Step: 8         Procedure Step 2.f:
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: Y                While depressing TRIP CHECK button on indicator and trip unit being tested, turn TRIP CHECK ADJUST knob on corresponding power supply unit clockwise to just above the low trip set point, And leave in this condition.
Page 6 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Standard:                   Adjusts trip check adjust knob.
Performance Step: 8 Critical: Y Procedure Step 2.f:
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
While depressing TRIP CHECK button on indicator and trip unit being tested, turn TRIP CHECK ADJUST knob on corresponding power supply unit clockwise to just above the low trip set point, And leave in this condition.
Performance Step: 9         Procedure Step 2.g:
Standard:
Critical: Y                Depress the RESET button on the Indicator and Trip unit, And verify the downscale light is OFF and annunciator 4-A-31 (Area Monitor Downscale) is RESET.
Adjusts trip check adjust knob.
Standard:                   Verifies annunciator is reset.
Performance:
Evaluator Cue:             Inform examinee that 4-A-31 is reset.
SATISFACTORY UNSATISFACTORY Comments:
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Performance Step: 9 Critical: Y Procedure Step 2.g:
Performance Step: 10       Procedure Step 2.h:
Depress the RESET button on the Indicator and Trip unit, And verify the downscale light is OFF and annunciator 4-A-31 (Area Monitor Downscale) is RESET.
Critical: N                Circle all downscale meter readings that do not fall within the acceptance criteria of +/-30% of the downscale setpoint on posted ARM setpoint sheet.
Standard:
Standard:                   Circles out of acceptance readings.
Verifies annunciator is reset.
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Evaluator Cue:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Inform examinee that 4-A-31 is reset.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 10 Critical: N Procedure Step 2.h:
Circle all downscale meter readings that do not fall within the acceptance criteria of +/-30% of the downscale setpoint on posted ARM setpoint sheet.
Standard:
Circles out of acceptance readings.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                   Page 7 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Performance Step: 11       Procedure Step 4.a:
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: Y                While depressing TRIP CHECK button on the Indicator and Trip unit being tested, turn TRIP CHECK ADJUST knob on the power supply unit clockwise until the upscale trip occurs.
Page 7 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Standard:                   Adjusts until upscale trip occurs.
Performance Step: 11 Critical: Y Procedure Step 4.a:
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
While depressing TRIP CHECK button on the Indicator and Trip unit being tested, turn TRIP CHECK ADJUST knob on the power supply unit clockwise until the upscale trip occurs.
Performance Step: 12       Procedure Step 4.b:
Standard:
Critical: N                Record the recorder reading at which the upscale trip occurred in the column labeled mr/hr under SECTION II of Figure 1.
Adjusts until upscale trip occurs.
Standard:                   Records meter reading (14 to 26).
Performance:
Evaluator Cue:             If examinee requests the reading on the paperless digital recorder, state that it reads the same as the meter being adjusted.
SATISFACTORY UNSATISFACTORY Comments:
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Performance Step: 12 Critical: N Procedure Step 4.b:
Performance Step: 13       Procedure Step 4.c:
Record the recorder reading at which the upscale trip occurred in the column labeled mr/hr under SECTION II of Figure 1.
Critical: N                Verify the upscale light on the Indicator and Trip unit is ON by recording initials in the column labeled LT under SECTION II of Figure 1.
Standard:
Standard:                   Verifies upscale light is ON.
Records meter reading (14 to 26).
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Evaluator Cue:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
If examinee requests the reading on the paperless digital recorder, state that it reads the same as the meter being adjusted.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 13 Critical: N Procedure Step 4.c:
Verify the upscale light on the Indicator and Trip unit is ON by recording initials in the column labeled LT under SECTION II of Figure 1.
Standard:
Verifies upscale light is ON.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                   Page 8 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Performance Step: 14       Procedure Step 4.d:
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: N                Verify the appropriate annunciator is in ALARM by recording initials in column labeled ANN under SECTION II of Figure 1.
Page 8 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Standard:                   Verifies alarm and initials form.
Performance Step: 14 Critical: N Procedure Step 4.d:
Evaluator Cue:             Inform examinee that appropriate annunciator is in alarm.
Verify the appropriate annunciator is in ALARM by recording initials in column labeled ANN under SECTION II of Figure 1.
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Standard:
Performance Step: 15       Procedure Step 4.e:
Verifies alarm and initials form.
Critical: N                From the SPDS display while TRIP CHECK button is depressed and upscale trip is in alarm, record readings in the mr/hr column and verify alarm condition received by recording initials in the applicable column under SECTION III of Figure 1(Acceptance Criteria + 30%).
Evaluator Cue:
Standard:                   Records readings from SPDS.
Inform examinee that appropriate annunciator is in alarm.
Evaluator Cue:             Inform examinee that SPDS reads 20 mr/hr.
Performance:
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 16       Procedure Step 4.f:
Performance Step: 15 Critical: N Procedure Step 4.e:
Critical: Y                While depressing TRIP CHECK button on indicator and trip unit being tested, turn TRIP CHECK ADJUST knob on corresponding power supply unit counter-clockwise to just below the high trip set-point, And leave in this condition.
From the SPDS display while TRIP CHECK button is depressed and upscale trip is in alarm, record readings in the mr/hr column and verify alarm condition received by recording initials in the applicable column under SECTION III of Figure 1(Acceptance Criteria + 30%).
Standard:                   Adjusts trip check adjust knob.
Standard:
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Records readings from SPDS.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Evaluator Cue:
Inform examinee that SPDS reads 20 mr/hr.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 16 Critical: Y Procedure Step 4.f:
While depressing TRIP CHECK button on indicator and trip unit being tested, turn TRIP CHECK ADJUST knob on corresponding power supply unit counter-clockwise to just below the high trip set-point, And leave in this condition.
Standard:
Adjusts trip check adjust knob.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                   Page 9 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Performance Step: 17       Procedure Step 4.g:
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: Y                Depress the RESET button on the Indicator and Trip unit, And verify the upscale light is OFF and appropriate annunciator is RESET.
Page 9 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Standard:                   Resets the annunciator.
Performance Step: 17 Critical: Y Procedure Step 4.g:
Evaluator Cue:             Inform examinee that appropriate annunciator is reset.
Depress the RESET button on the Indicator and Trip unit, And verify the upscale light is OFF and appropriate annunciator is RESET.
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Standard:
Performance Step: 18       Procedure Step 4.h:
Resets the annunciator.
Critical: N                Circle all upscale meter readings that do not fall within the acceptance criteria of +/-30% of the upscale setpoint on posted ARM setpoint sheet.
Evaluator Cue:
Standard:                   Circles out of acceptance readings.
Inform examinee that appropriate annunciator is reset.
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Performance:
Performance Step: 19       Procedure Step 4.i:
SATISFACTORY UNSATISFACTORY Comments:
Critical: N                From the SPDS display, verify alarm conditions are cleared form ARMs A1 through A21, B1 through B5, C1 through C3, and D1 under SECTION III of Figure 1.
Performance Step: 18 Critical: N Procedure Step 4.h:
Standard:                   Verifies alarm conditions are clear Evaluator Cue:             Inform examinee that all SPDS alarms are clear.
Circle all upscale meter readings that do not fall within the acceptance criteria of +/-30% of the upscale setpoint on posted ARM setpoint sheet.
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Standard:
Performance Step: 20       Procedure step 6 Critical: N                Announce over the page that Area Radiation Monitor testing is complete.
Circles out of acceptance readings.
Standard:                   Makes plant announcement.
Performance:
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 19 Critical: N Procedure Step 4.i:
From the SPDS display, verify alarm conditions are cleared form ARMs A1 through A21, B1 through B5, C1 through C3, and D1 under SECTION III of Figure 1.
Standard:
Verifies alarm conditions are clear Evaluator Cue:
Inform examinee that all SPDS alarms are clear.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 20 Critical: N Procedure step 6 Announce over the page that Area Radiation Monitor testing is complete.
Standard:
Makes plant announcement.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                           Page 10 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Performance Step: 21           INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: N Standard:                     Operator informs evaluator that the task is completed.
Page 10 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Evaluator Cue:                 Acknowledge that the task has been completed.
Performance Step: 21 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
Standard:
Terminating Cues:         Candidate informs evaluator JPM is complete.
Operator informs evaluator that the task is completed.
Stop Time:
Evaluator Cue:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Acknowledge that the task has been completed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
Candidate informs evaluator JPM is complete.
Stop Time:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                           Page 11 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Historical Record:
QF1075-01 Rev. 5 (FP-T-SAT-75)
Procedure and Template updates for 2016 ILT NRC Exam.
Page 11 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Historical Record:
Procedure and Template updates for 2016 ILT NRC Exam.  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                             Page 12 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Simulator Setup (as required):
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 12 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Simulator Setup (as required):
: 1. This JPM can be run from the following Standard (Specific) IC sets:
: 1. This JPM can be run from the following Standard (Specific) IC sets:
* Mode 1 IC SIMULATOR INPUT  
* Mode 1 IC SIMULATOR INPUT  


==SUMMARY==
==SUMMARY==
Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger


Manual                                                                                  Severity    Event Trigger      Type    Code                Description                    Delay    Ramp Or Value  Trigger Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF1075-01 Rev. 5 (FP-T-SAT-75)
 
Page 13 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                             Page 13 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS                                                                   YES NO       N/A
REVIEW STATEMENTS YES NO N/A
: 1. Are all items on the cover page filled in correctly?
: 1.
: 2. Has the JPM been reviewed and validated by SMEs?
Are all items on the cover page filled in correctly?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 2.
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
Has the JPM been reviewed and validated by SMEs?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 3.
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 4.
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 5.
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6.
If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8.
Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 9.
Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 10. Have the performance steps been identified and typed (Critical /
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
Sequence / Time Critical) appropriately?
Line 1,153: Line 1,695:
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________                  __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date  
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                           Page 14 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 ATTACHMENT 2 JPM Number: JPM-B.05.12-001 JPM Title: Perform the Area Radiation Monitor Functional Test Examinee & ID:                                                   Evaluator:
QF1075-01 Rev. 5 (FP-T-SAT-75)
Job Title:                                                     Date:
Page 14 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Start Time                                               Finish Time PERFORMANCE RESULTS:                                 SAT:                       UNSAT:
ATTACHMENT 2 JPM Number: JPM-B.05.12-001 JPM
 
==Title:==
Perform the Area Radiation Monitor Functional Test Examinee & ID:
Evaluator:
Job
 
==Title:==
Date:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                       Page 15 of 15 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
QF1075-01 Rev. 5 (FP-T-SAT-75)
* Plant is operating at 100% power.
Page 15 of 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
* Maintenance was performed on ARM Channel A1 and it requires PMT.
ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
Plant is operating at 100% power.
Maintenance was performed on ARM Channel A1 and it requires PMT.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
* The CRS has directed you to perform Test 1025-A (Area Radiation Monitor Functional), Steps 1, 2, 4 and 6 for ONLY Channel A1.
The CRS has directed you to perform Test 1025-A (Area Radiation Monitor Functional), Steps 1, 2, 4 and 6 for ONLY Channel A1.
* The Evaluator will act as the second operator Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
The Evaluator will act as the second operator  


QF1075-01 Rev. 5 (FP-T-SAT-75)
QF1075-01 Rev. 5 (FP-T-SAT-75)
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JOB PERFORMANCE MEASURE (JPM)
JOB PERFORMANCE MEASURE (JPM)
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   MANUALLY INITIATE SBGT A TRAIN JPM NUMBER:                   JPM-B.04.02-003                   REV.       10 RELATED PRA                   None INFORMATION:
SITE:
TASK NUMBERS /               CR261.102 TASK TITLE(S):               SBGT A(B) Train Quarterly Test K/A NUMBERS:                 261000                 A4.07         Rating: SRO/RO:     3.2/3.1 APPLICABLE METHOD OF TESTING:
MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
Discussion:                 Simulate/walkthrough:               Perform:
MANUALLY INITIATE SBGT A TRAIN JPM NUMBER:
EVALUATION LOCATION:             In-Plant:                             Control Room:
JPM-B.04.02-003 REV.
Simulator:                             Other:
10 RELATED PRA INFORMATION:
None TASK NUMBERS /
TASK TITLE(S):
CR261.102 SBGT A(B) Train Quarterly Test K/A NUMBERS:
261000 A4.07 Rating: SRO/RO:
3.2/3.1 APPLICABLE METHOD OF TESTING:
Discussion:
Simulate/walkthrough:
Perform:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Other:
Lab:
Lab:
Time for Completion:         15       Minutes                   Time Critical:     No Alternate Path:               No TASK APPLICABILITY:               SRO:             RO:             NLO Additional site-specific signatures may be added as desired.
Time for Completion:
15 Minutes Time Critical:
No Alternate Path:
No TASK APPLICABILITY:
SRO:
RO:
NLO Additional site-specific signatures may be added as desired.
Developed by:
Developed by:
Developer                                   Date Validated by:
Developer Date Validated by:
Validator                                 Date (See JPM Validation Checklist, Attachment 1)
Validator (See JPM Validation Checklist, Attachment 1)
Approved by:
Date Approved by:
Training Supervisor                             Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Training Supervisor Date  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                       Page 2 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 2 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                           Page 3 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 INITIAL CONDITIONS:
QF1075-01 Rev. 5 (FP-T-SAT-75)
* The Reactor is at power
Page 3 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
* SBGT needs to be manually started to support Test 0213 (Drywell To Suppression Chamber Vacuum Breaker Leakage Operational Check)
INITIAL CONDITIONS:
* You are the Balance of Plant operator INITIATING CUES:
The Reactor is at power SBGT needs to be manually started to support Test 0213 (Drywell To Suppression Chamber Vacuum Breaker Leakage Operational Check)
* The CRS directs you to perform STEPs 1-4 of the B.04.02-05.D.3 to manually initiate SBGT A Train.
You are the Balance of Plant operator INITIATING CUES:
The CRS directs you to perform STEPs 1-4 of the B.04.02-05.D.3 to manually initiate SBGT A Train.
Simulator Setup Instructions:
Simulator Setup Instructions:
* No other simulator setup is needed; perform from any at-power IC Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
No other simulator setup is needed; perform from any at-power IC  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 4 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 JPM PERFORMANCE INFORMATION Required Materials:         None General  
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 4 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM PERFORMANCE INFORMATION Required Materials:
None General  


==References:==
==References:==
B.04.02-05 Task Standards:             Manually Initiate SBGT A Train Start Time:
B.04.02-05 Task Standards:
Manually Initiate SBGT A Train Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Performance Step: 1           Locate procedure B.04.02-05, Manually Initiate SBGT A Train Critical: N Operator obtains and reviews procedure.
Performance Step: 1 Critical: N Locate procedure B.04.02-05, Manually Initiate SBGT A Train Operator obtains and reviews procedure.
Standard:                     Obtains appropriate procedure.
Standard:
Evaluator Cue:                 None Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
Obtains appropriate procedure.
Performance Step: 2           Operator reviews prerequisites Critical: N                    No painting has occurred within Reactor Building for at least 48 hours, Or If painting has occurred within 48 hours of SBGT operation, Then notify the SCTMT System Engineer to evaluate the effect on the charcoal filters.
Evaluator Cue:
Standard:                     Evaluate prerequisite Evaluator Cue:                 When asked, state that no painting has occurred in the Reactor Building for at least 48 hours.
None Performance:
Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 2 Critical: N Operator reviews prerequisites No painting has occurred within Reactor Building for at least 48 hours, Or If painting has occurred within 48 hours of SBGT operation, Then notify the SCTMT System Engineer to evaluate the effect on the charcoal filters.
Standard:
Evaluate prerequisite Evaluator Cue:
When asked, state that no painting has occurred in the Reactor Building for at least 48 hours.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 5 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Performance Step: 3             (Procedure B.04.02-05 D.3, STEP 1)
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: Y
Page 5 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 3 Critical: Y (Procedure B.04.02-05 D.3, STEP 1)
: 1. Position the following handswitches:
: 1. Position the following handswitches:
: a. HS-2945, AO-2945, to OPEN
: a. HS-2945, AO-2945, to OPEN
: b. HS-2979, AO-2979, to OPEN
: b. HS-2979, AO-2979, to OPEN
: c. HS-2955, Filter Heater E-34A-1, to ON
: c. HS-2955, Filter Heater E-34A-1, to ON
: d. HS-2983A, V-EF-17A (SBGT Exh Fan), to ON Standard:                       Positions the following handswitches:
: d. HS-2983A, V-EF-17A (SBGT Exh Fan), to ON Standard:
HS-2945, AO-2945, to OPEN HS-2979, AO-2979, to OPEN HS-2955, Filter Heater E-34A-1, to ON HS-2983A, V-EF-17A (SBGT Exh Fan), to ON Evaluator Note:                 Filter heater does not come on until V-EF-17 is started.
Positions the following handswitches:
Valves wont reposition until SBGT A is placed in Manual on the next step Evaluator Cue:                 None Performance:                   SATISFACTORY             UNSATISFACTORY Comments:
HS-2945, AO-2945, to OPEN HS-2979, AO-2979, to OPEN HS-2955, Filter Heater E-34A-1, to ON HS-2983A, V-EF-17A (SBGT Exh Fan), to ON Evaluator Note:
Performance Step: 4             (Procedure B.04.02-05 D.3, STEP 2)
Filter heater does not come on until V-EF-17 is started.
Critical: Y
Valves wont reposition until SBGT A is placed in Manual on the next step Evaluator Cue:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 4 Critical: Y (Procedure B.04.02-05 D.3, STEP 2)
: 2. Place HS-2988A, A STBY Gas Train Mode Switch, in Position 1 (MANUAL), and verify blue light ON.
: 2. Place HS-2988A, A STBY Gas Train Mode Switch, in Position 1 (MANUAL), and verify blue light ON.
Standard:                       Places HS-2988A in Position 1 (MANUAL)
Standard:
Places HS-2988A in Position 1 (MANUAL)
(Non-Critical portion of Standard)
(Non-Critical portion of Standard)
Verifies that blue light is on Evaluator Cue:                 None Performance:                   SATISFACTORY             UNSATISFACTORY Comments:
Verifies that blue light is on Evaluator Cue:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
None Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                         Page 6 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Performance Step: 5             (Procedure B.04.02-05 D.3, STEP 3)
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: N
Page 6 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 5 Critical: N (Procedure B.04.02-05 D.3, STEP 3)
: 3. VERIFY red light above HS-2955 is ON.
: 3. VERIFY red light above HS-2955 is ON.
Standard:                       Verifies red light above HS-2955 is ON Evaluator Cue:                 None Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
Standard:
Performance Step: 6             (Procedure B.04.02-05 D.3, STEP 4)
Verifies red light above HS-2955 is ON Evaluator Cue:
Critical: N                        4. VERIFY one of the following indicates flow:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 6 Critical: N (Procedure B.04.02-05 D.3, STEP 4)
: 4. VERIFY one of the following indicates flow:
: a. FIC-2943, SBGT A Loop Flow Control
: a. FIC-2943, SBGT A Loop Flow Control
: b. FIC-2942, SBGT B Loop Flow Control Standard:                       Verifies flow is indicated on FIC-2943 for SBGT A Loop Evaluator Cue:                 None Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
: b. FIC-2942, SBGT B Loop Flow Control Standard:
Performance Step: 7           INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
Verifies flow is indicated on FIC-2943 for SBGT A Loop Evaluator Cue:
Critical: N Standard:                     Operator informs evaluator that the task is completed.
None Performance:
Evaluator Cue:                 Acknowledge Report Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 7 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
Standard:
Operator informs evaluator that the task is completed.
Evaluator Cue:
Acknowledge Report Performance:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
Terminating Cues:
Stop Time:
Stop Time:
Historical Record:
Historical Record:
Revised to align with Revision 35 of B.04.02-05 for the 2016 ILT NRC Exam Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Revised to align with Revision 35 of B.04.02-05 for the 2016 ILT NRC Exam  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 7 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Simulator Setup (as required):
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 7 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Simulator Setup (as required):
: 1. This JPM can be run from the following Standard (Specific) IC sets:
: 1. This JPM can be run from the following Standard (Specific) IC sets:
* IC-* (IC-*), (IC Conditions Summary)
* IC-* (IC-*), (IC Conditions Summary)
Line 1,260: Line 1,856:


==SUMMARY==
==SUMMARY==
Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger


Manual                                                                                  Severity    Event Trigger      Type    Code                Description                    Delay    Ramp Or Value    Trigger Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF1075-01 Rev. 5 (FP-T-SAT-75)
 
Page 8 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 8 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS                                                                   YES NO       N/A
REVIEW STATEMENTS YES NO N/A
: 1. Are all items on the cover page filled in correctly?
: 1.
: 2. Has the JPM been reviewed and validated by SMEs?
Are all items on the cover page filled in correctly?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 2.
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
Has the JPM been reviewed and validated by SMEs?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 3.
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 4.
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 5.
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6.
If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8.
Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 9.
Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 10. Have the performance steps been identified and typed (Critical /
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
Sequence / Time Critical) appropriately?
Line 1,280: Line 1,886:
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________                  __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date  
Validation Personnel /Date                 Validation Personnel/Date
 
__________________________                  __________________________
QF1075-01 Rev. 5 (FP-T-SAT-75)
Validation Personnel /Date                 Validation Personnel/Date
Page 9 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
__________________________                  __________________________
ATTACHMENT 2 JPM Number: JPM-B.04.02-003 JPM
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                            Page 9 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 ATTACHMENT 2 JPM Number: JPM-B.04.02-003 JPM Title: Manually Initiate SBGT A Train Examinee & ID:                                                   Evaluator:
==Title:==
Job Title:                                                     Date:
Manually Initiate SBGT A Train Examinee & ID:
Start Time                                               Finish Time PERFORMANCE RESULTS:                                 SAT:                       UNSAT:
Evaluator:
Job
 
==Title:==
Date:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                       Page 10 of 10 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
QF1075-01 Rev. 5 (FP-T-SAT-75)
* The Reactor is at power
Page 10 of 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
* SBGT needs to be manually started to support Test 0213 (Drywell To Suppression Chamber Vacuum Breaker Leakage Operational Check)
ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
* You are the Balance of Plant operator INITIATING CUES:
The Reactor is at power SBGT needs to be manually started to support Test 0213 (Drywell To Suppression Chamber Vacuum Breaker Leakage Operational Check)
* The CRS directs you to perform STEPs 1-4 of the B.04.02-05.D.3 to manually initiate SBGT A Train.
You are the Balance of Plant operator INITIATING CUES:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
The CRS directs you to perform STEPs 1-4 of the B.04.02-05.D.3 to manually initiate SBGT A Train.  


QF-1075-01 Rev. 4 (FP-T-SAT-75)
QF-1075-01 Rev. 4 (FP-T-SAT-75)
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JOB PERFORMANCE MEASURE (JPM)
JOB PERFORMANCE MEASURE (JPM)
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   FIRE WATER CROSS-TIE TO LPCI JPM NUMBER:                   JPM-C.5-3203-001                 REV.       15 RELATED PRA                   PRA-ALT-INJ-LY INFORMATION:
SITE:
TASK NUMBERS /               CR314.110 / NL314.106 TASK TITLE(S):                Use Alternate Injection Systems For RPV Makeup K/A NUMBERS:                 295031         EA1.08               Rating: SRO/RO:     3.9 / 3.8 APPLICABLE METHOD OF TESTING:
MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
Discussion:             Simulate/walkthrough:             Perform:
FIRE WATER CROSS-TIE TO LPCI JPM NUMBER:
EVALUATION LOCATION:             In-Plant:                             Control Room:
JPM-C.5-3203-001 REV.
Simulator:                             Other:
15 RELATED PRA INFORMATION:
PRA-ALT-INJ-LY TASK NUMBERS /
TASK TITLE(S):
CR314.110 / NL314.106 Use Alternate Injection Systems For RPV Makeup K/A NUMBERS:
295031 EA1.08 Rating: SRO/RO:
3.9 / 3.8 APPLICABLE METHOD OF TESTING:
Discussion:
Simulate/walkthrough:
Perform:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Other:
Lab:
Lab:
Time for Completion:         15       Minutes                   Time Critical:     No Alternate Path:               No TASK APPLICABILITY:               SRO:             RO:             NLO Additional site-specific signatures may be added as desired.
Time for Completion:
Developed by:                       Ronald C. Newberry Developer                                   Date Validated by:
15 Minutes Time Critical:
Validator                                 Date (See JPM Validation Checklist, Attachment 1)
No Alternate Path:
Approved by:                           Chris Peterson Training Supervisor                             Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
No TASK APPLICABILITY:
SRO:
RO:
NLO Additional site-specific signatures may be added as desired.
Developed by:
Ronald C. Newberry Developer Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Date Approved by:
Chris Peterson Training Supervisor Date  
 
QF-1075-01 Rev. 4 (FP-T-SAT-75)
Page 2 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM Number: JPM-C.5-3203-001 JPM
 
==Title:==
Fire Water Cross-Tie To LPCI Examinee:
Evaluator:
Job


QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                          Page 2 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 JPM Number: JPM-C.5-3203-001 JPM Title: Fire Water Cross-Tie To LPCI Examinee:                                                  Evaluator:
==Title:==
Job Title:                                                      Date:
Date:
Start Time                                               Finish Time PERFORMANCE RESULTS:                                 SAT:                       UNSAT:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                                       Page 3 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 JPM BRIEFING/TURNOVER Provide briefing/turnover in accordance with applicable program description and/or training procedure.
QF-1075-01 Rev. 4 (FP-T-SAT-75)
Page 3 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM BRIEFING/TURNOVER Provide briefing/turnover in accordance with applicable program description and/or training procedure.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* An emergency condition exists requiring the use of Alternate Injection Systems for RPV Makeup.
An emergency condition exists requiring the use of Alternate Injection Systems for RPV Makeup.
* The Diesel Fire Pump is operating supplying the Fire Header.
The Diesel Fire Pump is operating supplying the Fire Header.
* RHRSW is NOT supplying RHR.
RHRSW is NOT supplying RHR.
INITIATING CUES:
INITIATING CUES:
* The CRS directs you to perform the IN-PLANT steps for lining up the Fire Water system for LPCI Injection using PART D of C.5-3203.
The CRS directs you to perform the IN-PLANT steps for lining up the Fire Water system for LPCI Injection using PART D of C.5-3203.
* ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.
ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.
* INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.
INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.
EVALUATOR NOTE: Some steps in this procedure require the use of a ladder. To prevent the inadvertent bumping of plant equipment, use of the ladder MUST BE SIMULATED.
EVALUATOR NOTE: Some steps in this procedure require the use of a ladder. To prevent the inadvertent bumping of plant equipment, use of the ladder MUST BE SIMULATED.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                             Page 4 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 JPM PERFORMANCE INFORMATION Required Materials:
QF-1075-01 Rev. 4 (FP-T-SAT-75)
* Copy of Procedure C.5-3203, PART D General  
Page 4 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM PERFORMANCE INFORMATION Required Materials:
Copy of Procedure C.5-3203, PART D General  


==References:==
==References:==
* C.5-3203 (Use of Alternate Injection Systems for RPV Makeup), Rev. 16 Task Standards:
C.5-3203 (Use of Alternate Injection Systems for RPV Makeup), Rev. 16 Task Standards:
* Fire Water has been lined up to LPCI injection in accordance with Procedure C.5-3203, Section D.
Fire Water has been lined up to LPCI injection in accordance with Procedure C.5-3203, Section D.
Start Time:
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Performance Step: 1         Review controlled copy of Procedure C.5-3203, Section D (Fire Water Critical: N                  Cross-Tie to LPCI).
Performance Step: 1 Critical: N Review controlled copy of Procedure C.5-3203, Section D (Fire Water Cross-Tie to LPCI).
Standard:                   Reviews correct procedure and section.
Standard:
Evaluator Cue:               Provide operator with copy of procedure C.5-3203, PART D.
Reviews correct procedure and section.
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
Evaluator Cue:
Performance Step: 2       Procedure STEP 1.
Provide operator with copy of procedure C.5-3203, PART D.
Critical: N CLOSE RHRSW-13, EMER INJECTION LEAKAGE TELL TALE.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 2 Critical: N Procedure STEP 1.
CLOSE RHRSW-13, EMER INJECTION LEAKAGE TELL TALE.
Standard:
Standard:
* Proceeds to the 931 level of the Turbine Building.
Proceeds to the 931 level of the Turbine Building.
* Rotates handwheel for RHRSW-13 CW until valve is fully CLOSED.
Rotates handwheel for RHRSW-13 CW until valve is fully CLOSED.
Evaluator Cue:             INFORM operator that RHRSW-13 moves in clockwise direction, stem lowers, meets resistance and is tight.
Evaluator Cue:
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
INFORM operator that RHRSW-13 moves in clockwise direction, stem lowers, meets resistance and is tight.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                                 Page 5 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Performance Step: 3         Procedure STEP 2.
QF-1075-01 Rev. 4 (FP-T-SAT-75)
Critical: N Verify CLOSED the following valves:
Page 5 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
* RHRSW-12, EMERGENCY INJECTION VIA A RHRSW LOOP.
Performance Step: 3 Critical: N Procedure STEP 2.
* RHRSW-68, RHRSW EMERGENCY FLEX INJECTION ISOLATION VALVE.
Verify CLOSED the following valves:
RHRSW-12, EMERGENCY INJECTION VIA A RHRSW LOOP.
RHRSW-68, RHRSW EMERGENCY FLEX INJECTION ISOLATION VALVE.
Standard:
Attempts to rotate handwheel for RHRSW-12 CW.
Attempts to rotate handwheel for RHRSW-68 CW.
Evaluator Note:
A stepladder designated for this procedure is located by door 40. When operator goes to obtain the ladder, indicate that the ladder is in position.
Evaluator Cue:
When operator attempts to rotate respective handwheel, INFORM him resistance is felt and valve does NOT turn.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 4 Critical: N Procedure STEP 3.
Verify CLOSED the following valves:
MO-2020, RHR DIV 1 DRYWELL SPRAY - OUTBOARD.
MO-2006, RHR DIV 1 DISCHARGE TO TORUS - OUTBOARD.
MO-2021, RHR DIV 2 DRYWELL SPRAY - OUTBOARD.
MO-2007, RHR DIV 2 DISCHARGE TO TORUS - OUTBOARD.
Standard:
Standard:
* Attempts to rotate handwheel for RHRSW-12 CW.
Contacts Control Room to verify status of the listed valves.
* Attempts to rotate handwheel for RHRSW-68 CW.
Evaluator Cue:
Evaluator Note:            A stepladder designated for this procedure is located by door 40. When operator goes to obtain the ladder, indicate that the ladder is in position.
As Control Room Operator, REPORT MO-2020, MO-2006, MO-2021 and MO-2007 indicate CLOSED.
Evaluator Cue:              When operator attempts to rotate respective handwheel, INFORM him resistance is felt and valve does NOT turn.
Performance:
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:  
Performance Step: 4        Procedure STEP 3.
Critical: N Verify CLOSED the following valves:
* MO-2020, RHR DIV 1 DRYWELL SPRAY - OUTBOARD.
* MO-2006, RHR DIV 1 DISCHARGE TO TORUS - OUTBOARD.
* MO-2021, RHR DIV 2 DRYWELL SPRAY - OUTBOARD.
* MO-2007, RHR DIV 2 DISCHARGE TO TORUS - OUTBOARD.
Standard:                  Contacts Control Room to verify status of the listed valves.
Evaluator Cue:             As Control Room Operator, REPORT MO-2020, MO-2006, MO-2021 and MO-2007 indicate CLOSED.
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                                   Page 6 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Performance Step: 5         Procedure STEP 4.
QF-1075-01 Rev. 4 (FP-T-SAT-75)
Critical: Y OPEN the following valves:
Page 6 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
* RHRSW-46, EMERGENCY INJECTION VIA DIESEL FIRE PUMP
Performance Step: 5 Critical: Y Procedure STEP 4.
* RHRSW-14, EMERGENCY INJECTION VIA A RHRSW LOOP Standard:
OPEN the following valves:
* Rotates handwheel for RHRSW-46 CCW until valve is OPEN.
RHRSW-46, EMERGENCY INJECTION VIA DIESEL FIRE PUMP RHRSW-14, EMERGENCY INJECTION VIA A RHRSW LOOP Standard:
* Rotates handwheel for RHRSW-14 CCW until valve is OPEN.
Rotates handwheel for RHRSW-46 CCW until valve is OPEN.
Evaluator Note:             A stepladder designated for this procedure is located by door 40. When operator goes to obtain the ladder, indicate that the ladder is in position.
Rotates handwheel for RHRSW-14 CCW until valve is OPEN.
Evaluator Cue:               INFORM operator that the respective valve moves in the counter clockwise direction, stem rises, meets resistance and is tight.
Evaluator Note:
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
A stepladder designated for this procedure is located by door 40. When operator goes to obtain the ladder, indicate that the ladder is in position.
Performance Step: 6         Procedure STEP 5.
Evaluator Cue:
Critical: N If injecting through RHR-A Standard:                   Informs Control Room that Firewater is lined up to LPCI.
INFORM operator that the respective valve moves in the counter clockwise direction, stem rises, meets resistance and is tight.
Evaluator Cue:               When operator proceeds to Procedure Step 5, INFORM him that the Control Room will complete the procedure.
Performance:
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 7       INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
Performance Step: 6 Critical: N Procedure STEP 5.
Critical N Standard:                 Operator informs evaluator that the task is completed.
If injecting through RHR-A Standard:
Evaluator Cue:             Acknowledge that the task has been completed.
Informs Control Room that Firewater is lined up to LPCI.
Evaluator Note:           DO NOT PROMPT Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Evaluator Cue:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
When operator proceeds to Procedure Step 5, INFORM him that the Control Room will complete the procedure.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 7 Critical N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
Standard:
Operator informs evaluator that the task is completed.
Evaluator Cue:
Acknowledge that the task has been completed.
Evaluator Note:
DO NOT PROMPT Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                       Page 7 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Terminating Cues: Firewater is cross-tied to RHRSW.
QF-1075-01 Rev. 4 (FP-T-SAT-75)
Page 7 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Terminating Cues: Firewater is cross-tied to RHRSW.
Stop Time:
Stop Time:
Historical Record: Revision 15
Historical Record: Revision 15 Updated to latest standards, JPM template and procedural revisions.
* Updated to latest standards, JPM template and procedural revisions.
Changed Performance Step 2 to NON-CRITICAL since leaving the tell-tale drain open would NOT prevent injecting Fire Water using LPCI.  
* Changed Performance Step 2 to NON-CRITICAL since leaving the tell-tale drain open would NOT prevent injecting Fire Water using LPCI.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                           Page 8 of 9 TURNOVER SHEET INITIAL CONDITIONS:
QF-1075-01 Rev. 4 (FP-T-SAT-75)
* An emergency condition exists requiring the use of Alternate Injection Systems for RPV Makeup.
Page 8 of 9 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
* The Diesel Fire Pump is operating supplying the Fire Header.
TURNOVER SHEET INITIAL CONDITIONS:
* RHRSW is NOT supplying RHR.
An emergency condition exists requiring the use of Alternate Injection Systems for RPV Makeup.
The Diesel Fire Pump is operating supplying the Fire Header.
RHRSW is NOT supplying RHR.
INITIATING CUES:
INITIATING CUES:
* The CRS directs you to perform the IN-PLANT steps for lining up the Fire Water system for LPCI Injection using PART D of C.5-3203.
The CRS directs you to perform the IN-PLANT steps for lining up the Fire Water system for LPCI Injection using PART D of C.5-3203.
* ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.
ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.
* INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.
INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                             Page 9 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
QF-1075-01 Rev. 4 (FP-T-SAT-75)
REVIEW STATEMENTS                                                                 YES NO       N/A
Page 9 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
: 1. Are all items on the cover page filled in correctly?
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
: 2. Has the JPM been reviewed and validated by SMEs?
REVIEW STATEMENTS YES NO N/A
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 1.
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
Are all items on the cover page filled in correctly?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 2.
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
Has the JPM been reviewed and validated by SMEs?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 3.
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 4.
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5.
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6.
If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8.
Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 9.
Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 10. Have the performance steps been identified and typed (Critical /
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
Sequence / Time Critical) appropriately?
Line 1,435: Line 2,112:
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________                  __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date  
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)
QF1075-01 Rev. 5 (FP-T-SAT-75)
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JOB PERFORMANCE MEASURE (JPM)
JOB PERFORMANCE MEASURE (JPM)
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   PREPARE THE CRD SYSTEM FOR ALTERNATE BORON INJECTION JPM NUMBER:                   JPM-C.5-3102-001                 REV.       0 RELATED PRA                   None INFORMATION:
SITE:
TASK NUMBERS /               NL314.102 TASK TITLE(S):               Perform actions associated with Alternate Boron Injection with CRD K/A NUMBERS:                 295037         EA1.10               Rating: SRO/RO:     3.7/3.9 APPLICABLE METHOD OF TESTING:
MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
Discussion:                 Simulate/walkthrough:               Perform:
PREPARE THE CRD SYSTEM FOR ALTERNATE BORON INJECTION JPM NUMBER:
EVALUATION LOCATION:             In-Plant:                             Control Room:
JPM-C.5-3102-001 REV.
Simulator:                             Other:
0 RELATED PRA INFORMATION:
None TASK NUMBERS /
TASK TITLE(S):
NL314.102 Perform actions associated with Alternate Boron Injection with CRD K/A NUMBERS:
295037 EA1.10 Rating: SRO/RO:
3.7/3.9 APPLICABLE METHOD OF TESTING:
Discussion:
Simulate/walkthrough:
Perform:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Other:
Lab:
Lab:
Time for Completion:         20       Minutes                   Time Critical:     No Alternate Path:               No TASK APPLICABILITY:               SRO:             RO:             NLO Additional site-specific signatures may be added as desired.
Time for Completion:
20 Minutes Time Critical:
No Alternate Path:
No TASK APPLICABILITY:
SRO:
RO:
NLO Additional site-specific signatures may be added as desired.
Developed by:
Developed by:
Developer                                   Date Validated by:
Developer Date Validated by:
Validator                                 Date (See JPM Validation Checklist, Attachment 1)
Validator (See JPM Validation Checklist, Attachment 1)
Approved by:
Date Approved by:
Training Supervisor                             Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Training Supervisor Date  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                       Page 2 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev.0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 2 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev.0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 1,465: Line 2,157:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* The plant is in a condition where boron injection is required and the SBLC system is not available.
The plant is in a condition where boron injection is required and the SBLC system is not available.
The SBLC tank is at 1500 gallons. It is filled with enriched boron solution that met the concentration requirements of Technical Specification 3.4.B. the last time it was checked.
The SBLC tank is at 1500 gallons. It is filled with enriched boron solution that met the concentration requirements of Technical Specification 3.4.B. the last time it was checked.
* No. 11 CRD pump is in service and No. 12 CRD pump is not running.
No. 11 CRD pump is in service and No. 12 CRD pump is not running.
* You are an extra operator on shift INITIATING CUES (IF APPLICABLE):
You are an extra operator on shift INITIATING CUES (IF APPLICABLE):
* The CRS directs you to prepare the CRD System for alternate boron injection using 11 CRD pump with procedure C.5-3102 (ALTERNATE BORON INJECTION WITH CRD) Steps 1 through 2.g.
The CRS directs you to prepare the CRD System for alternate boron injection using 11 CRD pump with procedure C.5-3102 (ALTERNATE BORON INJECTION WITH CRD) Steps 1 through 2.g.
* Another operator will complete the procedure
Another operator will complete the procedure INFORM THE EVALUATOR WHEN THE TASK IS COMPLETE.
* INFORM THE EVALUATOR WHEN THE TASK IS COMPLETE.
ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED  
* ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                             Page 3 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 JPM PERFORMANCE INFORMATION Required Materials:         C.5-3102, Part A General  
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 3 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM PERFORMANCE INFORMATION Required Materials:
C.5-3102, Part A General  


==References:==
==References:==
C.5-3102 Task Standards:             Prepare the CRD System for Alternate Boron Injection Using No. 11 CRD Pump Start Time:
C.5-3102 Task Standards:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Prepare the CRD System for Alternate Boron Injection Using No. 11 CRD Pump Start Time:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                 Page 4 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 4 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Performance Step: 1           Locates procedure C.5-3102 (Alternate Boron Injection With CRD).
Performance Step: 1 Critical N Locates procedure C.5-3102 (Alternate Boron Injection With CRD).
Critical N Standard:                     Locates Appropriate Procedure Evaluator Cue:                 Provide the Operator with a copy of the procedure (C.5-3102).
Standard:
Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
Locates Appropriate Procedure Evaluator Cue:
Performance Step: 2           (Procedure STEP 1)
Provide the Operator with a copy of the procedure (C.5-3102).
Critical: N If the SBLC tank level is less than 1000 Gallons, Then fill it using PART B, And perform steps 2.a. through 2.l. of PART A concurrently.
Performance:
Standard:                     Operator should not perform PART B. (1500 gal given in initial conditions)
SATISFACTORY UNSATISFACTORY Comments:
Evaluator Cue:                 None Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
Performance Step: 2 Critical: N (Procedure STEP 1)
Performance Step: 3             (Procedure STEP 2a)
If the SBLC tank level is less than 1000 Gallons, Then fill it using PART B, And perform steps 2.a. through 2.l. of PART A concurrently.
Critical: N Prepare the CRD system for alternate injection by performing the following:
Standard:
Operator should not perform PART B. (1500 gal given in initial conditions)
Evaluator Cue:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 3 Critical: N (Procedure STEP 2a)
Prepare the CRD system for alternate injection by performing the following:
If a CRD pump is required, Then verify 11 CRD pump is operating.
If a CRD pump is required, Then verify 11 CRD pump is operating.
Standard:                       Verifies 11 CRD pump operating (given in initial conditions)
Standard:
Evaluator Cue:                 None Performance:                   SATISFACTORY           UNSATISFACTORY Comments:                       ____________________________________________________________
Verifies 11 CRD pump operating (given in initial conditions)
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Evaluator Cue:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                 Page 5 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Performance Step: 4           (Procedure STEP 2b)
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: N If 12 CRD pump is operating, Then STOP 12 CRD pump.
Page 5 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Standard:                     Recognizes step is not applicable and N/As step Evaluator Cue:                 None Performance:                   SATISFACTORY           UNSATISFACTORY Comments:                     _____________________________________________________________
Performance Step: 4 Critical: N (Procedure STEP 2b)
Performance Step: 5             (Procedure STEP 2c)
If 12 CRD pump is operating, Then STOP 12 CRD pump.
Critical: Y                    Verify CLOSED the following valves:
Standard:
CRD-2-2, 12 CRD PUMP SUCT CRD-3-2, 12 CRD PUMP DISCHARGE THROTTLE CST-147, CST CUNO FILTER OUT TO 12 CRD PUMP CRD-45, CRD PUMPS SEAL WTR XTIE CRD-7-2, 12 CRD PUMP RECIRC TO CST CRD-7-1, 11 CRD PUMP RECIRC TO CST CRD-168, CRD PUMP BYPASS ISOL Standard:                       1. Closes CRD-2-2 by turning handwheel full travel clockwise, And
Recognizes step is not applicable and N/As step Evaluator Cue:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 5 Critical: Y (Procedure STEP 2c)
Verify CLOSED the following valves:
CRD-2-2, 12 CRD PUMP SUCT CRD-3-2, 12 CRD PUMP DISCHARGE THROTTLE CST-147, CST CUNO FILTER OUT TO 12 CRD PUMP CRD-45, CRD PUMPS SEAL WTR XTIE CRD-7-2, 12 CRD PUMP RECIRC TO CST CRD-7-1, 11 CRD PUMP RECIRC TO CST CRD-168, CRD PUMP BYPASS ISOL Standard:
: 1. Closes CRD-2-2 by turning handwheel full travel clockwise, And
: 2. Closes CRD-3-2 by turning handwheel full travel clockwise, And
: 2. Closes CRD-3-2 by turning handwheel full travel clockwise, And
: 3. Closes CRD-45 by turning handwheel full travel clockwise, And
: 3. Closes CRD-45 by turning handwheel full travel clockwise, And
Line 1,509: Line 2,219:
(Non-Critical portion of Standard)
(Non-Critical portion of Standard)
Verifies CST-147 closed by noting valve stem full in and attempting to turn handwheel in the clockwise direction.
Verifies CST-147 closed by noting valve stem full in and attempting to turn handwheel in the clockwise direction.
Evaluator Cue:                 1. For CRD-2-2, CRD-3-2, CRD-45 and CRD-168 that are open and need to be closed; the valve stems move IN, meet resistance and are tight.
Evaluator Cue:
: 1. For CRD-2-2, CRD-3-2, CRD-45 and CRD-168 that are open and need to be closed; the valve stems move IN, meet resistance and are tight.
: 2. For CST-147; the valve is tight.
: 2. For CST-147; the valve is tight.
: 3. For CRD-7-1 and CRD-7-2;, the valve stems move IN, meet resistance and are tight.
: 3. For CRD-7-1 and CRD-7-2;, the valve stems move IN, meet resistance and are tight.
Performance:                   SATISFACTORY           UNSATISFACTORY Comments:                       __________________________________________________________
Performance:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 6 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Performance Step: 6             (Procedure STEP 2d)
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: Y OPEN CRD-46-2, 12 CRD PUMP OTBD VENT Standard:                       Opens CRD-46-2 Evaluator Cue:                 Valve turns CCW and then meets resistance Performance:                   SATISFACTORY           UNSATISFACTORY Comments:                       ___________________________________________________________
Page 6 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 7           (Procedure STEP 2e)
Performance Step: 6 Critical: Y (Procedure STEP 2d)
Critical: Y Remove the pipe cap on the 1 in. vertical line (in CRD Pump Room between CRD-2-2 and the Y-strainer 3-15B).
OPEN CRD-46-2, 12 CRD PUMP OTBD VENT Standard:
Standard:                     Using a wrench, removes pipe cap from 1 in. line by turning CCW.
Opens CRD-46-2 Evaluator Cue:
Evaluator Note:               Pipe wrench is located on CRD PUMP HOSE CART at top of stairway entrance to the CRD Pump room.
Valve turns CCW and then meets resistance Performance:
Evaluator Cue:               Pipe cap turns CCW, the pipe cap is removed.
SATISFACTORY UNSATISFACTORY Comments:
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:                     ______________________________________________________________
Performance Step: 7 Critical: Y (Procedure STEP 2e)
Performance Step: 8           (Procedure STEP 2f)
Remove the pipe cap on the 1 in. vertical line (in CRD Pump Room between CRD-2-2 and the Y-strainer 3-15B).
Critical: Y CLOSE CRD-46-2 Standard:                     Closes CRD-46-2 Evaluator Cue:               Valve turns CW and then meets resistance Performance:                 SATISFACTORY           UNSATISFACTORY Comments:                     ______________________________________________________________
Standard:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Using a wrench, removes pipe cap from 1 in. line by turning CCW.
Evaluator Note:
Pipe wrench is located on CRD PUMP HOSE CART at top of stairway entrance to the CRD Pump room.
Evaluator Cue:
Pipe cap turns CCW, the pipe cap is removed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 8 Critical: Y (Procedure STEP 2f)
CLOSE CRD-46-2 Standard:
Closes CRD-46-2 Evaluator Cue:
Valve turns CW and then meets resistance Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                   Page 7 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Performance Step: 9           (Procedure STEP 2g)
QF1075-01 Rev. 5 (FP-T-SAT-75)
Critical: Y Connect the union end of the hose from the CRD PUMP HOSE CART (top of stairway entrance to CRD Pump Room) to the 1 In vertical line (in CRD Pump Room between CRD-2-2 and the Y-strainer 3-15B).
Page 7 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 9 Critical: Y (Procedure STEP 2g)
Connect the union end of the hose from the CRD PUMP HOSE CART (top of stairway entrance to CRD Pump Room) to the 1 In vertical line (in CRD Pump Room between CRD-2-2 and the Y-strainer 3-15B).
: 1. Install TEE # 1 - CRD SUCTION LINE VENT with vent valve to 1 inch vertical line. (Tee stored on CRD PUMP HOSE CART) at stairway entrance to CRD pump room.)
: 1. Install TEE # 1 - CRD SUCTION LINE VENT with vent valve to 1 inch vertical line. (Tee stored on CRD PUMP HOSE CART) at stairway entrance to CRD pump room.)
: 2. Connect hose union tee.
: 2. Connect hose union tee.
: 3. Verify 1 inch vertical line vent valve is CLOSED.
: 3. Verify 1 inch vertical line vent valve is CLOSED.
Standard:                     Installs tee and connects union end of hose to the 1 In. vertical line by threading on and tightening with wrench in the CW direction.
Standard:
Evaluator Cue:               Union end of hose threads onto 1 In. vertical line, turns CW and is tight.
Installs tee and connects union end of hose to the 1 In. vertical line by threading on and tightening with wrench in the CW direction.
Performance:                 SATISFACTORY             UNSATISFACTORY Comments:                     ______________________________________________________________
Evaluator Cue:
Performance Step: 28           INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
Union end of hose threads onto 1 In. vertical line, turns CW and is tight.
Critical: N Standard:                       Informs evaluator that the task is completed.
Performance:
Evaluator Note:                 DO NOT PROMPT Evaluator Cue:                 Acknowledge task is complete Performance:                   SATISFACTORY             UNSATISFACTORY Comments:                       ____________________________________________________________
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:         When report is made that the task is complete, state the JPM is complete Stop Time:
Performance Step: 28 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
Historical Record: New Create for the 2016 ILT NRC Exam Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Standard:
Informs evaluator that the task is completed.
Evaluator Note:
DO NOT PROMPT Evaluator Cue:
Acknowledge task is complete Performance:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
When report is made that the task is complete, state the JPM is complete Stop Time:
Historical Record: New Create for the 2016 ILT NRC Exam  


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 8 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Simulator Setup (as required):
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 8 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Simulator Setup (as required):
: 1. This JPM can be run from the following Standard (Specific) IC sets:
: 1. This JPM can be run from the following Standard (Specific) IC sets:
* IC-* (IC-*), (IC Conditions Summary)
* IC-* (IC-*), (IC Conditions Summary)
Line 1,547: Line 2,281:


==SUMMARY==
==SUMMARY==
Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger


Manual                                                                                  Severity    Event Trigger      Type    Code                Description                    Delay    Ramp Or Value    Trigger Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF1075-01 Rev. 5 (FP-T-SAT-75)
 
Page 9 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 9 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS                                                                   YES NO       N/A
REVIEW STATEMENTS YES NO N/A
: 1. Are all items on the cover page filled in correctly?
: 1.
: 2. Has the JPM been reviewed and validated by SMEs?
Are all items on the cover page filled in correctly?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 2.
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
Has the JPM been reviewed and validated by SMEs?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 3.
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 4.
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 5.
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6.
If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8.
Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 9.
Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 10. Have the performance steps been identified and typed (Critical /
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
Sequence / Time Critical) appropriately?
Line 1,567: Line 2,311:
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________                  __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date  
Validation Personnel /Date                 Validation Personnel/Date
 
__________________________                  __________________________
QF1075-01 Rev. 5 (FP-T-SAT-75)
Validation Personnel /Date                 Validation Personnel/Date
Page 10 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
__________________________                  __________________________
ATTACHMENT 2 JPM Number: JPM-C.5-3102-002 JPM
Validation Personnel /Date                 Validation Personnel/Date
 
__________________________                  __________________________
==Title:==
Validation Personnel /Date                 Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Prepare the CRD System for Alternate Boron Injection Examinee & ID:
Evaluator:
Job


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                          Page 10 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 ATTACHMENT 2 JPM Number: JPM-C.5-3102-002 JPM Title: Prepare the CRD System for Alternate Boron Injection Examinee & ID:                                                    Evaluator:
==Title:==
Job Title:                                                      Date:
Date:
Start Time                                               Finish Time PERFORMANCE RESULTS:                                 SAT:                       UNSAT:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75)                                                         Page 11 of 11 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
QF1075-01 Rev. 5 (FP-T-SAT-75)
* The plant is in a condition where boron injection is required and the SBLC system is not available.
Page 11 of 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
The plant is in a condition where boron injection is required and the SBLC system is not available.
The SBLC tank is at 1500 gallons. It is filled with enriched boron solution that met the concentration requirements of Technical Specification 3.4.B. the last time it was checked.
The SBLC tank is at 1500 gallons. It is filled with enriched boron solution that met the concentration requirements of Technical Specification 3.4.B. the last time it was checked.
* No. 11 CRD pump is in service and No. 12 CRD pump is not running.
No. 11 CRD pump is in service and No. 12 CRD pump is not running.
* You are an extra operator on shift INITIATING CUES (IF APPLICABLE):
You are an extra operator on shift INITIATING CUES (IF APPLICABLE):
* The CRS directs you to prepare the CRD System for alternate boron injection using 11 CRD pump with procedure C.5-3102 (ALTERNATE BORON INJECTION WITH CRD) Steps 1 through 2.g.
The CRS directs you to prepare the CRD System for alternate boron injection using 11 CRD pump with procedure C.5-3102 (ALTERNATE BORON INJECTION WITH CRD) Steps 1 through 2.g.
* Another operator will complete the procedure
Another operator will complete the procedure INFORM THE EVALUATOR WHEN THE TASK IS COMPLETE.
* INFORM THE EVALUATOR WHEN THE TASK IS COMPLETE.
ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED  
* ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                                 Page 1 of 12 JOB PERFORMANCE MEASURE (JPM)
QF-1075-01 Rev. 4 (FP-T-SAT-75)
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   MANUAL CONTROL OF RHRSW CV-1729 JPM NUMBER:                   JPM-B.08.01.03-001               REV.       10 RELATED PRA                   None INFORMATION:
Page 1 of 12 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
TASK NUMBERS /               NL205.118 TASK TITLE(S):               Take Manual Control of the RHRSW Control Valves, CV-1728 and CV-1729 upon Failure of SV-1728 or SV-1729 K/A NUMBERS:             205000 A2.08                               Rating: SRO/RO:     3.3/3.5 APPLICABLE METHOD OF TESTING:
JOB PERFORMANCE MEASURE (JPM)
Discussion:               Simulate/walkthrough:               Perform:
SITE:
EVALUATION LOCATION:             In-Plant:                             Control Room:
MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
Simulator:                             Other:
MANUAL CONTROL OF RHRSW CV-1729 JPM NUMBER:
JPM-B.08.01.03-001 REV.
10 RELATED PRA INFORMATION:
None TASK NUMBERS /
TASK TITLE(S):
NL205.118 Take Manual Control of the RHRSW Control Valves, CV-1728 and CV-1729 upon Failure of SV-1728 or SV-1729 K/A NUMBERS:
205000 A2.08 Rating: SRO/RO:
3.3/3.5 APPLICABLE METHOD OF TESTING:
Discussion:
Simulate/walkthrough:
Perform:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Other:
Lab:
Lab:
Time for Completion:         20       Minutes                   Time Critical:     No Alternate Path:               No TASK APPLICABILITY:               SRO:             RO:             NLO Additional site-specific signatures may be added as desired.
Time for Completion:
20 Minutes Time Critical:
No Alternate Path:
No TASK APPLICABILITY:
SRO:
RO:
NLO Additional site-specific signatures may be added as desired.
Developed by:
Developed by:
Developer                                   Date Validated by:
Developer Date Validated by:
Validator                                   Date (See JPM Validation Checklist, Attachment 1)
Validator (See JPM Validation Checklist, Attachment 1)
Approved by:
Date Approved by:
Training Supervisor                               Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Training Supervisor Date  
 
QF-1075-01 Rev. 4 (FP-T-SAT-75)
Page 2 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM Number: JPM-B.08.01.03-001 JPM
 
==Title:==
Manual Control of RHRSW CV-1729 Examinee:
Evaluator:
Job


QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                        Page 2 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 JPM Number: JPM-B.08.01.03-001 JPM Title: Manual Control of RHRSW CV-1729 Examinee:                                                  Evaluator:
==Title:==
Job Title:                                                      Date:
Date:
Start Time                                               Finish Time PERFORMANCE RESULTS:                                 SAT:                       UNSAT:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                                     Page 3 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
QF-1075-01 Rev. 4 (FP-T-SAT-75)
Page 3 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 1,622: Line 2,403:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* The Reactor is shutdown and <212F. The No. 12 RHR Heat Exchanger Control valve CV-1729 solenoid valve SV-1729 has failed. The No. 11 and No. 13 RHR pump breakers have been previously removed for breaker maintenance. Shutdown cooling is desired at this time.
The Reactor is shutdown and <212F. The No. 12 RHR Heat Exchanger Control valve CV-1729 solenoid valve SV-1729 has failed. The No. 11 and No. 13 RHR pump breakers have been previously removed for breaker maintenance. Shutdown cooling is desired at this time.
INITIATING CUES:
INITIATING CUES:
* The Control Room Supervisor directs you to assume manual control of RHR Heat Exchanger RHRSW control valve CV-1729 in accordance with B.08.01.03-05.H.3.
The Control Room Supervisor directs you to assume manual control of RHR Heat Exchanger RHRSW control valve CV-1729 in accordance with B.08.01.03-05.H.3.
* ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.
ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.
* INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.
INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                               Page 4 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 JPM PERFORMANCE INFORMATION Required Materials:
QF-1075-01 Rev. 4 (FP-T-SAT-75)
* Copy of Procedure B.08.01.03-05, Section H.3 (Taking Manual Control of RHRSW Control Valves CV-1728 and CV-1729 Upon Failure of SV-1728 or SV-1729)
Page 4 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
* Copy of B.08.01.03-06 Figure 2 (RHRSW Control Valve General  
JPM PERFORMANCE INFORMATION Required Materials:
Copy of Procedure B.08.01.03-05, Section H.3 (Taking Manual Control of RHRSW Control Valves CV-1728 and CV-1729 Upon Failure of SV-1728 or SV-1729)
Copy of B.08.01.03-06 Figure 2 (RHRSW Control Valve General  


==References:==
==References:==
* B.08.01.03-05 (RHR Service Water System-System Operation)
B.08.01.03-05 (RHR Service Water System-System Operation)
Task Standards:
Task Standards:
* Manual control of CV-1729 is established and valve position is set correctly for plant conditions Start Time:
Manual control of CV-1729 is established and valve position is set correctly for plant conditions Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 1             Locate Procedure B.08.01.03-05.H.3, "Taking Manual Control of RHRSW Critical: N                    Control Valves, CV-1728 and CV-1729 Upon Failure of SV-1728 or SV-1729."
Performance Step: 1 Critical: N Locate Procedure B.08.01.03-05.H.3, "Taking Manual Control of RHRSW Control Valves, CV-1728 and CV-1729 Upon Failure of SV-1728 or SV-1729."
Standard:
Standard:
* Locates and reviews the appropriate procedure.
Locates and reviews the appropriate procedure.
* Determines Part B is the appropriate procedure for the task Evaluator Cue:
Determines Part B is the appropriate procedure for the task Evaluator Cue:
* When operator locates (or provides a verbal description of the location) controlled copy of procedure and section, PROVIDE operator copy of section H.2 of procedure B.08.01.03-05.
When operator locates (or provides a verbal description of the location) controlled copy of procedure and section, PROVIDE operator copy of section H.2 of procedure B.08.01.03-05.
Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
Performance:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
SATISFACTORY UNSATISFACTORY Comments:  


QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                             Page 5 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Performance Step: 2         (Procedure PART B, STEP 11)
QF-1075-01 Rev. 4 (FP-T-SAT-75)
Critical: Y                Obtain key to unlock handwheel on CV-1729, 12 RHRSW Outlet.
Page 5 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 2 Critical: Y (Procedure PART B, STEP 11)
Obtain key to unlock handwheel on CV-1729, 12 RHRSW Outlet.
Standard:
Standard:
* Obtains key No. 41 from operator key ring or the W.E.C.
Obtains key No. 41 from operator key ring or the W.E.C.
Evaluator Cue:
Evaluator Cue:
* If operator requests key from the W.E.C, INFORM operator that they have the key.
If operator requests key from the W.E.C, INFORM operator that they have the key.
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Performance:
Performance Step: 3       (Procedure STEP 12)
SATISFACTORY UNSATISFACTORY Comments:
Critical: N                Establish communications between B RHR Room and Control Room Standard:
Performance Step: 3 Critical: N (Procedure STEP 12)
* Establishes radio communication between the Control Room and himself from the B RHR room.
Establish communications between B RHR Room and Control Room Standard:
Establishes radio communication between the Control Room and himself from the B RHR room.
Evaluator Cue:
Evaluator Cue:
* When operator describes where to find a radio, INFORM them that radio communication is established between Control Room and B RHR room.
When operator describes where to find a radio, INFORM them that radio communication is established between Control Room and B RHR room.
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Performance:
Performance Step: 4         (Procedure STEP 13)
SATISFACTORY UNSATISFACTORY Comments:
Critical: Y NOTE: Completion of following step will result in CV-1729's brass handwheel screw holding valve closed via engagement with valve stem.
Performance Step: 4 Critical: Y (Procedure STEP 13)
NOTE: Completion of following step will result in CV-1729's brass handwheel screw holding valve closed via engagement with valve stem.
Unlock the handwheel on CV-1729 (see Ops Man Section B.08.01.03-06, Figure 2 - RHRSW Control Valve),
Unlock the handwheel on CV-1729 (see Ops Man Section B.08.01.03-06, Figure 2 - RHRSW Control Valve),
And turn it clockwise until resistance is felt.
And turn it clockwise until resistance is felt.
Standard:
Standard:
* Unlocks the valve handwheel for CV-1729.
Unlocks the valve handwheel for CV-1729.
* Rotates the valve handwheel for CV-1729 clockwise until resistance is felt.
Rotates the valve handwheel for CV-1729 clockwise until resistance is felt.
Evaluator Cue:
Evaluator Cue:
* Handwheel is unlocked.
Handwheel is unlocked.
* CV-1729 handwheel rotates clockwise and resistance is felt.
CV-1729 handwheel rotates clockwise and resistance is felt.
Evaluator Note:
Evaluator Note:
* Operator does not have to examine figure in Ops Manual if they are familiar with the equipment.
Operator does not have to examine figure in Ops Manual if they are familiar with the equipment.
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Performance:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
SATISFACTORY UNSATISFACTORY Comments:  


QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                             Page 6 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Performance Step: 5             (Procedure STEP 14)
QF-1075-01 Rev. 4 (FP-T-SAT-75)
Critical: Y                                                    CAUTION Do not dead head pumps for more than 7 minutes.
Page 6 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 5 Critical: Y (Procedure STEP 14)
CAUTION Do not dead head pumps for more than 7 minutes.
Turn the air supply valve to the "MANUAL" position. (See Ops Man Section B.08.01.03-06, Figure 2 - RHRSW Control Valve for location of the air supply valve).
Turn the air supply valve to the "MANUAL" position. (See Ops Man Section B.08.01.03-06, Figure 2 - RHRSW Control Valve for location of the air supply valve).
Standard:
Standard:
* Turns the air supply valve to the MANUAL position.
Turns the air supply valve to the MANUAL position.
Evaluator Cue:
Evaluator Cue:
* Air supply valve is in the MANUAL position.
Air supply valve is in the MANUAL position.
Evaluator Note:
Evaluator Note:
* Operator does not have to examine Ops Manual figure if they are familiar with the equipment.
Operator does not have to examine Ops Manual figure if they are familiar with the equipment.
Performance:                   SATISFACTORY             UNSATISFACTORY Comments:
Performance:
Performance Step: 6             (Procedure STEP 15)
SATISFACTORY UNSATISFACTORY Comments:
Critical: N                    Notify Control Room of the following:
Performance Step: 6 Critical: N (Procedure STEP 15)
Notify Control Room of the following:
a) Control valve CV-1729 is ready for manual operation, b) RHRSW pump may be started.
a) Control valve CV-1729 is ready for manual operation, b) RHRSW pump may be started.
Standard:
Standard:
* Notifies the Control Room CV-1729 is ready for manual operation, And
Notifies the Control Room CV-1729 is ready for manual operation, And Notifies the Control Room, the RHRSW pump is ready to be started.
* Notifies the Control Room, the RHRSW pump is ready to be started.
Evaluator Cue:
Evaluator Cue:
* As the Control Room, acknowledge the report that CV-1729 is ready for manual operation and the RHRSW pump may be started.
As the Control Room, acknowledge the report that CV-1729 is ready for manual operation and the RHRSW pump may be started.
Performance:                   SATISFACTORY             UNSATISFACTORY Comments:
Performance:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
SATISFACTORY UNSATISFACTORY Comments:  


QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                                 Page 7 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Performance Step: 7             (Procedure STEP 16)
QF-1075-01 Rev. 4 (FP-T-SAT-75)
Critical: N                    START an RHRSW pump per Ops Man B.08.01.03-05.D.1, Startup Procedure - Startup of RHRSW Pumps.
Page 7 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Standard:                       None Evaluator Cue:
Performance Step: 7 Critical: N (Procedure STEP 16)
* As the Control Room, INFORM the operator that Control Room Operators have started the No. 12 RHRSW pump.
START an RHRSW pump per Ops Man B.08.01.03-05.D.1, Startup Procedure - Startup of RHRSW Pumps.
Standard:
None Evaluator Cue:
As the Control Room, INFORM the operator that Control Room Operators have started the No. 12 RHRSW pump.
Evaluator Note:
Evaluator Note:
* It is not the intent of this JPM for the operator to perform action in the Intake for starting of a RHRSW pump Performance:                   SATISFACTORY             UNSATISFACTORY Comments:
It is not the intent of this JPM for the operator to perform action in the Intake for starting of a RHRSW pump Performance:
Performance Step: 8             (Procedure STEP 17)
SATISFACTORY UNSATISFACTORY Comments:
Critical: Y                    Open CV-1729 to obtain the desired flow rate by turning the valve handwheel in the counterclockwise direction.
Performance Step: 8 Critical: Y (Procedure STEP 17)
No. of                           Approximate Pumps       Flowrate             Valve Position 1         3500 gpm               55% open 2         7000 gpm               85% open Standard:
Open CV-1729 to obtain the desired flow rate by turning the valve handwheel in the counterclockwise direction.
* Opens CV-1729 by turning the valve handwheel CCW until valve position is at 55%.
No. of Approximate Pumps Flowrate Valve Position 1
3500 gpm 55% open 2
7000 gpm 85% open Standard:
Opens CV-1729 by turning the valve handwheel CCW until valve position is at 55%.
Evaluator Cue:
Evaluator Cue:
* Valve position indicates approximately 55%. Flow rate is 3500 GPM.
Valve position indicates approximately 55%. Flow rate is 3500 GPM.
Performance:                   SATISFACTORY             UNSATISFACTORY Comments:
Performance:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
SATISFACTORY UNSATISFACTORY Comments:  


QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                               Page 8 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Performance Step: 9             (Procedure STEP 18)
QF-1075-01 Rev. 4 (FP-T-SAT-75)
Critical: N                    Verify that RHR HX tube-to-shell side dP is greater than 20 psid by checking DPIS-10-92B (local instrument rack), AND adjust valve position, as required.
Page 8 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 9 Critical: N (Procedure STEP 18)
Verify that RHR HX tube-to-shell side dP is greater than 20 psid by checking DPIS-10-92B (local instrument rack), AND adjust valve position, as required.
Standard:
Standard:
* Verifies DP is greater than 20 psid by checking dPIS-10-92B.
Verifies DP is greater than 20 psid by checking dPIS-10-92B.
Evaluator Cue:
Evaluator Cue:
* When operator checks dPIS-10-92B, INFORM the operator that the dPIS indicates 40 psid.
When operator checks dPIS-10-92B, INFORM the operator that the dPIS indicates 40 psid.
Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
Performance:
Performance Step: 10           (Procedure STEP 19)
SATISFACTORY UNSATISFACTORY Comments:
Critical: Y                    Lock handwheel for CV-1729 in position.
Performance Step: 10 Critical: Y (Procedure STEP 19)
Lock handwheel for CV-1729 in position.
Standard:
Standard:
* Locks the handwheel in position.
Locks the handwheel in position.
Evaluator Cue:
Evaluator Cue:
* Handwheel is locked in position.
Handwheel is locked in position.
Evaluator Note:
Evaluator Note:
* The valve position may drift unless the handwheel is locked.
The valve position may drift unless the handwheel is locked.
Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
Performance:
Performance Step: 11           (Procedure STEP 20)
SATISFACTORY UNSATISFACTORY Comments:
Critical: N NOTE: Valve CV-1729 is now locked in position at desired flow rate. An operator does not need to be stationed at valve continuously.
Performance Step: 11 Critical: N (Procedure STEP 20)
NOTE: Valve CV-1729 is now locked in position at desired flow rate. An operator does not need to be stationed at valve continuously.
Monitor system flowrate from Control Room.
Monitor system flowrate from Control Room.
Standard:                       None Evaluator Cue:
Standard:
* Flowrate is being monitored from the Control Room.
None Evaluator Cue:
Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
Flowrate is being monitored from the Control Room.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                         Page 9 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Performance Step: 12           INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
QF-1075-01 Rev. 4 (FP-T-SAT-75)
Critical: N Standard:                       Operator informs evaluator that the task is completed.
Page 9 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 12 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
Standard:
Operator informs evaluator that the task is completed.
Evaluator Cue:
Evaluator Cue:
* ACKNOWLEDGE that the task has been completed.
ACKNOWLEDGE that the task has been completed.
Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
Terminating Cues:
Stop Time:
Stop Time:
Historical Record:
Historical Record:
* Revision 11 updated JPM to newest revision of QF-1075-01 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Revision 11 updated JPM to newest revision of QF-1075-01  


QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                     Page 10 of 12 TURNOVER SHEET INITIAL CONDITIONS:
QF-1075-01 Rev. 4 (FP-T-SAT-75)
* The Reactor is shutdown and <212F. The No. 12 RHR Heat Exchanger Control valve CV-1729 solenoid valve SV-1729 has failed. The No. 11 and No. 13 RHR pump breakers have been previously removed for breaker maintenance. Shutdown cooling is desired at this time.
Page 10 of 12 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
TURNOVER SHEET INITIAL CONDITIONS:
The Reactor is shutdown and <212F. The No. 12 RHR Heat Exchanger Control valve CV-1729 solenoid valve SV-1729 has failed. The No. 11 and No. 13 RHR pump breakers have been previously removed for breaker maintenance. Shutdown cooling is desired at this time.
INITIATING CUES:
INITIATING CUES:
* The Control Room Supervisor directs you to assume manual control of RHR Heat Exchanger RHRSW control valve CV-1729 in accordance with B.08.01.03-05.H.3.
The Control Room Supervisor directs you to assume manual control of RHR Heat Exchanger RHRSW control valve CV-1729 in accordance with B.08.01.03-05.H.3.
* ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.
ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.
* INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.
INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                           Page 11 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Simulator Setup (as required):
QF-1075-01 Rev. 4 (FP-T-SAT-75)
Page 11 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Simulator Setup (as required):
: 1. This JPM can be run from the following Standard (Specific) IC sets:
: 1. This JPM can be run from the following Standard (Specific) IC sets:
* IC-* (IC-*), (IC Conditions Summary)
* IC-* (IC-*), (IC Conditions Summary)
Line 1,759: Line 2,565:


==SUMMARY==
==SUMMARY==
Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger


Manual                                                                                  Severity    Event Trigger      Type    Code                Description                    Delay    Ramp Or Value  Trigger Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF-1075-01 Rev. 4 (FP-T-SAT-75)
 
Page 12 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                           Page 12 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS                                                                   YES NO       N/A
REVIEW STATEMENTS YES NO N/A
: 1. Are all items on the cover page filled in correctly?
: 1.
: 2. Has the JPM been reviewed and validated by SMEs?
Are all items on the cover page filled in correctly?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 2.
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
Has the JPM been reviewed and validated by SMEs?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 3.
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 4.
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 5.
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6.
If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8.
Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 9.
Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 10. Have the performance steps been identified and typed (Critical /
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
Sequence / Time Critical) appropriately?
Line 1,779: Line 2,595:
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________                  __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date}}
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date
__________________________                  __________________________
Validation Personnel /Date                 Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.}}

Latest revision as of 20:39, 8 January 2025

2016 Monticello Nuclear Generating Plant Initial License Examination Proposed Control Room and In-Plant JPMs
ML17142A423
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/18/2017
From: David Reeser
NRC/RGN-III/DRS/OLB
To:
NRC/RGN-II/DRS/OLB
Shared Package
ML15274A423 List:
References
Download: ML17142A423 (125)


Text

QF1075-01 Rev. 5 (FP-T-SAT-75)

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

CONTROL ROD DRIVE EXERCISE JPM NUMBER:

JPM-0074-002 REV.

0 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

CR200.226 Respond to a drifting control rod K/A NUMBERS:

201003 A2.03 Rating: SRO/RO:

3.7/3.4 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

Time for Completion:

15 Minutes Time Critical:

No Alternate Path:

Yes TASK APPLICABILITY:

SRO:

RO:

NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 2 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 3 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

INITIAL CONDITIONS:

The plant is operating at 100% power. Control Rod Drive Exercise, Test 0074, is being performed.

The RO performing the test has performed a turnover with you.

INITIATING CUES (IF APPLICABLE):

Continue with Test 0074 at Control Rod 18-35.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 4 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM PERFORMANCE INFORMATION Required Materials:

Test 0074 initialized and completed per setup instructions Control rod position printout (from step 1 of 0074)

General

References:

0074 C.4-B.01.03.C TaskStandards:

Perform the Operator Actions for a drifting control rod Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Critical Y (0074 STEP 3) Select a withdrawn control rod by depressing the appropriate rod select pushbutton. Verify that the selected rod select pushbutton is illuminated and the selected rod indicates selection on the full-core display.

Standard:

Selects rod 18-35 Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 5 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 2 Critical Y (0074 STEP 5) Insert the selected rod one notch by momentarily placing switch 3A-S2, ROD MOVEMENT CONTROL, in ROD IN position and verify the rod position indication for the selected control rod in the single rod and the four rod group display changes to the next lower latched position.

Standard:

Places 3A-S2 in the ROD IN position.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical Y (0074 STEP 6) Withdraw the selected rod one notch by momentarily placing switch 3A-S2, ROD MOVEMENT CONTROL, in ROD OUT position and verify the rod position indication for the selected control rod in the single rod and the four rod group display changes to the next higher latched position.

Standard:

Places 3A-S2 in the ROD OUT position.

Evaluator Cue:

None Evaluator Note:

Ensure malfunction CH01_084 inserts when the candidate withdraws the rod. Rod 18-35 should start moving out.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 6 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 4 Critical N Alternate Path:

Scans the Full Core Display and determines the number of control rods that are drifting.

Standard:

Scans the Full Core Display on C-05 for the rod with the RED drifting light ON.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Critical N (C.4-B.01.03.C Procedure Step 1)

Immediate Action If more than one control rod is drifting, Then insert a manual reactor scram.

Standard:

Verifies only one rod is drifting and goes to STEP 2.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 7 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 6 Critical Y (C.4-B.01.03.C Procedure Step 2)

Immediate Action Momentarily place ROD SELECT POWER SWITCH 3A-S1 (Panel C-05) in OFF and return it to ON to de-energize the rod select matrix and de-select the drifting control rod.

Standard:

1. Turns ROD SELECT POWER SWITCH to OFF (non-critical); and
2. Then turns ROD SELECT POWER SWITCH to the ON position (Critical ONLY if power switch was turned to OFF).

(Non-Critical portion of Standard)

Operator should verify that no rod is selected after turning the switch ON.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical Y (C.4-B.01.03.C Procedure STEP 3)

Immediate Action If control rod drifting continues, Then re-select the drifting control rod, And insert and maintain the control rod at position 00 using normal or emergency insert.

Standard:

1. Drifting control rod is selected and inserted to 00 using either the NORMAL or EMERGENCY insert handswitch.
2. Drifting control rod is maintained at 00.

Evaluator Cue:

If examinee requests to release the ROD IN switch, allow them to do so the rod will drift out again forcing them to reinsert it.

Evaluator Note:

BOOTH OPERATOR: If the examinee holds the ROD IN then delete the drift out malfunction. If the examinee attempts to release the ROD IN switch do not delete the malfunction until they observe it drift out again and then reinsert the control rod.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 8 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 8 Critical N (C.4-B.01.03.C Procedure STEP 4)

Immediate Action Notify Shift Supervision.

Standard:

Notifies Shift Supervision IAW OWI-01.03.

Evaluator Cue:

Acknowledge as the CRS Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When rod 18-35 has been fully inserted and the CRS has been notified, inform the operator that the JPM is complete.

Stop Time:

Historical Record: New create for the 2016 ILT NRC Exam

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 9 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Simulator Setup (as required):

Any IC with rod 18-35 withdrawn to an intermediate position.

Verify rod 18-39 is selected Insert malfunction CH01_084 for CRD 18-35 on event 1.

Set event 1 to trigger on ZD_CRDWD.

Obtain a Control Rod position print out.

Initialize Surveillance Test 0074 SIMULATOR INPUT

SUMMARY

Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger 1

Malf CH01

_084 Control Rod 18-35 Drift out 00:00:05 Active 1

2 Malf CH01

_084 Control Rod 18-35 Drift out (Deletes in 1 second)

Active 2

Malf CH15

_084 CR 18-35 Elec DISARM DISARM

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 10 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the cover page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators

9.

Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 11 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 2 JPM Number: JPM-0074-002 JPM

Title:

Control Rod Drive Exercise Examinee & ID:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 12 of 12 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

The plant is operating at 100% power. Control Rod Drive Exercise, Test 0074, is being performed.

The RO performing the test has performed a turnover with you.

INITIATING CUES (IF APPLICABLE):

Continue with Test 0074 at Control Rod 18-35.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

STARTUP THE RWCU SYSTEM JPM NUMBER:

JPM-B.02.02-001 REV.

11 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

CR204.102; NL204.101; NL204.105 Place RWCU System In Service with No. 11 RWCU Pump and 11 RWCU Filter/Demineralizer In Service K/A NUMBERS:

204000 A2.04 A4.01 Rating: SRO/RO:

2.7/2.9 3.1/3.0 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

Time for Completion:

10 Minutes Time Critical:

No Alternate Path:

No TASK APPLICABILITY:

SRO:

RO:

NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 2 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The Reactor is Shutdown and Reactor coolant temperature is <212°F. Preparation for a plant startup is in progress. The RWCU system is ready for operation.

No. 12 RWCU Filter is being backwashed and will be put in service later.

The RWCU pumps and heat exchangers are filled and vented. RBCCW and Service Air Systems are operating properly.

INITIATING CUES (IF APPLICABLE):

The Control Room Supervisor directs you to place RWCU system in service by performing STEPS 12 and 13 of the RWCU system startup procedure B.02.02-05.D.1.

Use No. 11 RWCU pump and No. 11 Filter.

All required steps prior to STEP 12 have been successfully completed.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 3 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM PERFORMANCE INFORMATION Required Materials:

Full Scope Simulator General

References:

B.02.02-05 Task Standards:

Startup the RWCU System Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Locate procedure B.02.02-05 D.1. (System Startup During Shutdown or Refueling).

Standard:

Locates appropriate procedure and steps.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 4 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 2 Critical Y (Procedure STEP 12)

CAUTION Step 13 must be performed immediately following step 12.

START a reactor water cleanup pump using the Pump A or Pump B switch for the desired pump.

Standard:

Starts 11 RWCU pump using HS-12A-S5, and after a 3 second delay notices the pump trips. Notifies Control Room Supervisor.

Evaluator Cue:

Control Room Supervisor notifies operator that an investigation will be started and to start the 12 RWCU pump.

Evaluator Note:

Do NOT give cue if operator does not notify the Control Room Supervisor.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical Y (Procedure STEP 12)

CAUTION Step 13 must be performed immediately following step 12.

START a reactor water cleanup pump using the Pump A or Pump B switch for the desired pump.

Standard:

Starts 12 RWCU pump using HS-12A-S6 and observes CLEANUP PUMP DISCH pressure rising as indicated on PI-12-131.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 5 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 4 Critical N (Procedure STEP 13)

NOTE 1: The AIR-TO-LOCK-GAUGE will indicate about 3 psig when the valve starts to open.

NOTE 2: At flow >35 gpm the HOLDING PUMP will trip and AO-12-4-37A will close.

NOTE 3: Step 13 is to be performed while in communication with the control room.

At Panel C-82, slowly turn the manual regulator knob FIC-12-4-97A, to raise flow through the filter demin to 90 GPM as indicated on FI-12-141A.

Standard:

Directs the Radwaste APEO to slowly OPEN CV-12-4-15A.

Operator should observe the following:

1.

C04-B-21, CLEAN UP FILTER DEMIN FAILURE clears.

2.

FILTER A FLOW as indicated on FI-12-141A increases to ~90 gpm Evaluator Cue:

CV-12-4-15A is open.

Evaluator Note:

The RWCU pump has no minimum flow protection. If this step is not performed, pump damage will occur.

Booth Operator INSERT TRIGGER 1 and verify flow on No. 11 RWCU F/D to rises to 90 gpm Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When 12 RWCU Pump is running with F/D flow ~90 gpm, terminate the JPM.

Stop Time:

Historical Record: Updated for 2016 ILT NRC Exam

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 6 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Simulator Setup (as required):

1. This JPM can be run from the following Standard (Specific) IC sets:
  • Cold Shutdown IC with RWCU secured
  • Create Event Trigger 2 using ZD_RUSTR(1)

SIMULATOR INPUT

SUMMARY

Manual Trigger Type Code Description Delay Ramp Value Event Trigger 1

REM RU01B 11 RWCU F/D Setpoint 00:01:00 36 MAL RU01A 11 RWCU Pump trip 00:00:03 2

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 7 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the cover page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators

9.

Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 8 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 2 JPM Number: JPM-B.02.02-001 JPM

Title:

Startup the RWCU System Examinee & ID:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 9 of 9 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

The Reactor is Shutdown and Reactor coolant temperature is <212°F. Preparation for a plant startup is in progress. The RWCU system is ready for operation.

No. 12 RWCU Filter is being backwashed and will be put in service later.

The RWCU pumps and heat exchangers are filled and vented. RBCCW and Service Air Systems are operating properly.

INITIATING CUES (IF APPLICABLE):

The Control Room Supervisor directs you to place RWCU system in service by performing STEPS 12 and 13 of the RWCU system startup procedure B.02.02-05.D.1.

Use No. 11 RWCU pump and No. 11 Filter.

All required steps prior to STEP 12 have been successfully completed.INFORM EVALUATOR WHEN YOU HAVE COMPLETED THE TASK!

QF1075-01 Rev. 5 (FP-T-SAT-75)

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

k JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

OPEN THE MAIN STEAM LINE DRAINS FOLLOWING A GROUP 1 ISOLATION JPM NUMBER:

JPM-C.5-3302-003 REV.

0 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

CR239.110 Open the MSIVs Following a Group 1 Isolation K/A NUMBERS:

239001 A4.01 Rating: SRO/RO:

4.2/4.0 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

Time for Completion:

20 Minutes Time Critical:

No Alternate Path:

Yes TASK APPLICABILITY:

SRO:

RO:

NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 2 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The Reactor is in hot shutdown following a Reactor Scram due to a spurious Group 1 isolation.

The cause of the isolation is known and was determined to be INVALID INITIATING CUES (IF APPLICABLE):

The CRS directs you to perform the following:

Reset the Group 1 Isolation by performing Step 10 ONLY of C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION - GROUP 1) and THEN Restore and maintain RPV Pressure 700-750 psig IAW C.5-3302 (ALTERNATE PRESSURE CONTROL) using the Main Steam Line Drains.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 3 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM PERFORMANCE INFORMATION Required Materials:

Full Scope Simulator General

References:

C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION - GROUP 1)

C.5-3302 (ALTERNATE PRESSURE CONTROL)

Task Standards:

Reopen the MSIVs following a Group 1 isolation Start Time:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 4 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Critical: N Obtain and review procedures:

o C.4-B.04.01.A (Primary Containment Isolation - Group 1) o C.5-3302 (Alternate Pressure Control)

Standard:

Locates appropriate procedures Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 5 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 2 Critical: Y C.4-B.04.01.A, STEP 10)

When cause of isolation has been corrected, Then perform the following to allow opening of MSIVs:

a. On Panel C-03, PLACE MSIV inboard handswitches in CLOSED:

16A-S1A, AO-2-80A (11 INBD MSIV) 16A-S1B, AO-2-80B (12 INBD MSIV) 16A-S1C, AO-2-80C (13 INBD MSIV) 16A-S1D, AO-2-80D (14 INBD MSIV)

b. On Panel C-03, PLACE MSIV outboard handswitches in CLOSED:

16A-S2A, AO-2-86A (11 OTBD MSIV) 16A-S2B, AO-2-86B (12 OTBD MSIV) 16A-S2C, AO-2-86C (13 OTBD MSIV) 16A-S2D, AO-2-86D (14 OTBD MSIV)

c. On Panel C-04, VERIFY Recirc sample isolation valve handswitches in CLOSED:

16A-S7, CV-2790 (RECIRC SX LINE INBD ISOL) 16A-S8, CV-2791 (RECIRC SX LINE OTBD ISOL)

d. On Panel C-03, VERIFY Group 1 Isolation RESET using Reset pushbuttons:

16A-S32A, Main Steam Isolation Reset - Inboard 16A-S32B, Main Steam Isolation Reset - Outboard Standard:

Using C.4-B.04.01.A, candidate ensures:

1. All MSIV and sample line valve hand-switches are in the CLOSE position.
2. Pushbuttons 16-AS32A and 16A S32B have been depressed (white light indicators above pushbutton 16A S32A and 16A-S32B are lit)

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 6 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 3 Critical: N (C.5-3302, PART B Prerequisites)

1. Main Condenser available as Heat Sink.
2. One of the following:

MSIVs are OPEN OR Group 1 Isolation reset OR bypassed Standard:

Verifies perquisites are satisfied.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical: Y (C.5-3302, PART B)

1. IF MSIVs are CLOSED, THEN verify the following valves are OPEN:

NOTE: MO-2373 may be throttled to control RPV pressure.

MO-2564, STEAM LINE DRAIN DWNSTRM MSIVS MO-2373, MAIN STEAM LINE DRAIN - INBOARD MO-2374, MAIN STEAM LINE DRAIN - OUTBOARD Standard:

1. Ensures that the following valves are OPEN:

MO-2564, STEAM LINE DRAIN DWNSTRM MSIVS (Normally OPEN)

MO-2373, MAIN STEAM LINE DRAIN - INBOARD (will be closed initially due to isolation; THROTTLABE in OPEN direction only)

MO-2374, MAIN STEAM LINE DRAIN - OUTBOARD (will be closed initially due to isolation; NOT Throttlable)

2. Controls depressurization/cooldown rate by throttling MO-2373 Evaluator Cue:

None Evaluator Note:

BOOTH OPERATOR: Verify Event Trigger 1 activates. This will initiate a steam leak in the Steam Chase.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 7 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 5 Critical: N ALTERNATE PATH: ARP 3-B-56 (High Area Temp Steam Leak)

1. On C-21, MONITOR area temperatures as indicated by TR-4926, Steam Leak Detection Recorder, and DETERMINE affected area(s).

Standard:

1. Recognizes rising Steam Chase temperatures and notifies CRS.

Evaluator Cue:

When notified as CRS, acknowledge the report.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical: N ALTERNATE PATH: ARP 3-B-56

2. Refer to the following procedures:
a. C.4-B.02.04.A (Steam Leaks Outside Primary Containment)

Standard:

2. Enters C.4-B.02.04.A (Steam Leaks Outside Primary Containment)

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical: N ALTERNATE PATH: C.4-B.02.04.A

1. EVACUATE personnel from affected area.

Standard:

1. Makes page announcement to evacuate the Reactor Building Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 8 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 8 Critical: Y ALTERNATE PATH: C.4-B.02.04.A

6. If the origin of the leak is identified, Then ISOLATE if possible.

Standard:

6. Closes MO-2073 and/or MO-2074 to isolate the leak Evaluator Cue:

None Evaluator Note:

Steps 3-5 of C.4-B.02.04.A do NOT apply for the purposes of this JPM Examinee may also close MSIVs using C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION - GROUP 1 Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Critical: N ALTERNATE PATH:

Verifies On C-21, that the leak is isolated by monitoring steam chase temperatures.

Standard:

Verifies lowering steam chase temperatures on C-21 Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When the leak is isolated with MO-2073 and/or MO-2074 closed, terminate the JPM.

Stop Time:

Historical Record: New Create for the 2016 ILT NRC Exam.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 9 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Simulator Setup (as required):

Simulator Setup Instructions:

Reset to any full power IC.

Initiate a Group 1 Isolation using the malfunctions listed below Perform SCRAM Immediate Actions and EOP C.5-1100 actions to stabilize RPV water level (using FW) and pressure (using SRVs on Low-Low Set)

Set Event Trigger 1 to ZD_2374O SIMULATOR - MALFUNCTIONS:

MALF ID MALFUNCTION TITLE DELAY RAMP EVENT VALUE FINAL

1.

PP05A Spurious Group 1 - Channel A1 Active

2.

PP05C Spurious Group 1 - Channel B1 Active MS03 B Main Steam Line Rupture in Steam Tunnel 00:01:00 1

SIMULATOR - REMOTE FUNCTIONS:

REMOTE FUNC No.

REMOTE FUNCTION TITLE DELAY RAMP EVENT VALUE FINAL

1.

PC17 Group 1 B/P C.5-3017 INSTLD

2.

SIMUALTOR - OVERRIDES:

OVERRIDE ID OVERRIDE DESCRIPTION DELAY RAMP EVENT VALUE FINAL

1.
2.
3.
4.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 10 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the cover page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators

9.

Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 11 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 2 JPM Number: JPM-3302-003 JPM

Title:

Open the Main Steam Line Drains following a Group 1 Isolation Examinee & ID:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 12 of 12 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

The Reactor is in hot shutdown following a Reactor Scram due to a spurious Group 1 isolation.

The cause of the isolation is known and was determined to be INVALID INITIATING CUES (IF APPLICABLE):

The CRS directs you to perform the following:

Reset the Group 1 Isolation by performing Step 10 ONLY of C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION - GROUP 1) and THEN Restore and maintain RPV Pressure 700-750 psig IAW C.5-3302 (ALTERNATE PRESSURE CONTROL) using the Main Steam Line Drains.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 1 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

MANUAL SWITCHOVER OF HPCI SUCTION FROM TORUS TO CSTS JPM NUMBER:

JPM-B.03.02-005 REV.

0 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

CR206.115 Transfer HPCI Suction from Torus to CST K/A NUMBERS:

206000 (HPCI)

A2.04 Rating: SRO/RO:

3.7/3.7 Ability to manually operate and/or monitor in the control room:

Major systems valves APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

Time for Completion:

10 Minutes Time Critical:

No Alternate Path:

No TASK APPLICABILITY:

SRO:

RO:

NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 2 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

HPCI suction was transferred to the Torus for testing.

INITIATING CUES:

The CRS directs you to transfer HPCI suction from the Torus back to the CSTs in accordance with B.03.02-05.G.3 INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 3 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 JPM PERFORMANCE INFORMATION Required Materials:

Simulator General

References:

B.03.02-05, HPCI Task Standards:

HPCI suction switched from the Torus to the CSTs per B.03.02-05 G.3 Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Critical N Locates and reviews procedure B.03.02-05 G.3 (Manual Switchover of HPCI Suction from the Torus to the CSTs) and General Precautions Standard:

Obtains and reviews procedure B.03.02-05 G.3 and General Precautions Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Critical N (B.03.02-05 G.3 Step 1)

Evaluate TS 3.5.1 for HPCI inoperability during the suction transfer Standard:

Notifies CRS to evaluate TS 3.5.1 as HPCI will be inoperable during the suction transfer Evaluator Cues:

As the CRS state that TSs have been appropriately evaluated Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 4 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Performance Step: 3 Critical Y (B.03.02-05 G.3 Step 2)

Place the following handswitches to CLOSE and VERIFY dual indication:

23A-S14 MO-2061 (HPCI TORUS SUCT INBD ISOL)

Standard:

Places HS in Close for MO-2061 and verifies dual indication Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical Y (B.03.02-05 G.3 Step 2 Cont)

Place the following handswitches to CLOSE and VERIFY dual indication:

MO-2062 (HPCI TORUS SUCT INBD OTBD)

Standard:

Places HS in Close for MO-2062 and verifies dual indication.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Critical Y (B.03.02-05 G.3 Step 3)

Immediately verify OPEN MO-2063 (HPCI CST SUCTION)

Standard:

Verifies MO-2063 OPENS.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 5 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Performance Step: 6 Critical N (B.03.02-05 G.2 Step 4)

Verify fully CLOSED MO-2061 MO-2062 Standard:

Verifies both valves are fully closed Evaluator Cues:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical N (B.03.02-05 G.3 Step 5)

Evaluate TS 3.5.1 for HPCI operability Standard:

Notifies CRS to evaluate TS 3.5.1 Evaluator Cues:

As the CRS state that TSs have been appropriately evaluated Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

The candidate informs the evaluator that the task is complete.

Stop Time:

Historical Record:

New create for the 2016 ILT NRC Exam

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 6 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Simulator Setup (as required):

1. This JPM can be run from the following Standard (Specific) IC sets:
  • Any IC with the HPCI suction aligned to the Torus and CST level >2.5 SIMULATOR INPUT

SUMMARY

Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 7 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the cover page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators

9.

Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 8 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 9 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 2 JPM Number: JPM-B.03.02-005 JPM

Title:

Manual Switchover of HPCI Suction from Torus to CSTs Examinee & ID:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 10 of 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

HPCI suction was transferred to the Torus for testing.

INITIATING CUES:

The CRS directs you to transfer HPCI suction from the Torus back to the CSTs in accordance with B.03.02-05.G.3 INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

MANUALLY INSERT A GROUP 5 ISOLATION JPM NUMBER:

JPM-B.02.03-011 REV.

2 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

CR217.115 Open RCIC Steam Line Isolation Valves MO-2075 and MO-2076 CR200.161 Perform the Procedure for Primary Containment Group 5 Isolation K/A NUMBERS:

223002 A4.02 Rating: SRO/RO:

3.8 / 3.9 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

Time for Completion:

10 Minutes Time Critical:

No Alternate Path:

Yes TASK APPLICABILITY:

SRO:

RO:

NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 2 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

Plant is operating in Mode 1.

RCIC was isolated for maintenance and is in the process of being restored.

RP has been notified.

INITIATING CUES:

CRS has directed you to open MO-2075 and MO-2076 in accordance with the B.02.03-05.G.5.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 3 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM PERFORMANCE INFORMATION Required Materials:

None General

References:

B.02.03-05 (Reactor Core Isolation Cooling - System Operation), Rev. 31 C.4-B.04.01.E (Primary Containment Isolation - Group 5), Rev. 12 C.6-004-A-05 (RCIC Steam Line Hi Diff Press), Rev. 3 Task Standards:

MO-2075 and MO-2076 opened in accordance with B.02.03-05, section G.5 with the Group 5 isolation subsequently inserted in accordance with C.4-B.04.01.E.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Critical: N Obtain and review Procedure B.02.03-05, Section G.5 (Opening RCIC Steam Line Isolation Valves MO-2075 and MO-2076).

PREREQUISITES

1. No Group V isolation signal is present
2. RP personnel notified to address necessary controls for changing rad conditions in the RCIC Room Standard:

Obtains and reviews correct procedure and section.

Evaluator Cue:

State RP has been notified Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 4 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 2 Critical: N Procedure Step 1.

VERIFY Radiation Protection personnel have addressed necessary controls for changing radiological conditions in RCIC Room.

Standard:

Based on Initial Conditions, marks this step as complete.

Evaluator Cue:

If asked, INFORM Operator that RP has been notified.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical: N Procedure Step 2.

VERIFY valves CV-2082A and CV-2082B, RCIC Steam Line Drain to Main Condenser, are OPEN.

Standard:

Observes RED indicating lights for CV-2082A & CV-2082B are ON and GREEN lights are OFF.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical: Y Procedure Step 3.

Fully OPEN MO-2076, RCIC Steam Line Isolation Outboard.

a. If MO-2076 does NOT fully OPEN and dual indication is received, Then CLOSE MO-2076.
1) Attempt to OPEN MO-2076 on additional time.

Standard:

Opens MO-2076 by momentarily rotating control switch 13A-S3 CW to the OPEN position.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 5 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 5 Critical: Y Procedure Step 4.

CAUTION Opening MO-2075 too fast could cause the high flow switches to isolate the steam line or cause a steam hammer.

JOG OPEN RCIC inboard steam line isolation valve MO-2075 to slowly pressurize the RCIC steam line.

Standard:

Jogs Open MO-2075 by momentarily rotating control switch 13A-S1 CW to the OPEN position such that the RCIC Steam Line starts to pressurize.

Non-critical Portion:

Reports RCIC STEAM LINE HI DIFF PRESS annunciator 4-A-05 and Reactor Building Hi Radiation annunciator 4-A-11 and refers to ARP.

Evaluator Cue:

Floor Instructor: As CRS, ACKNOWLEDGE report.

Simulator Operator: When RCIC steam line pressurizes to 500 psig, VERIFY TRIGGER 1 INSERTS. This causes a RCIC Steam Line rupture.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical: N C.6-004-A-05, Steps 1 & 2.

VERIFY automatic actions have initiated.

Standard:

Reports that MO-2075 and MO-2076 did not auto-close.

Obtains and reviews Procedure C.4-B.04.01.E (Primary Containment Isolation - Group 5).

Evaluator Note:

Operator may use the VERIFY automatic actions portion of the ARP as guidance to shut MO-2075 and MO-2076. If so, this satisfies Critical Performance Step 7 of the JPM.

Evaluator Cue:

As CRS, ACKNOWLEDGE the report.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 6 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 7 Critical: Y C.4-B.04.01.E, Subsequent Operator Action Step 1.

VERIFY the following RCIC valves CLOSE:

a. MO-2075, RCIC Steam Supply Inbd Isol (Panel C-04)
b. MO-2076, RCIC Steam Supply Otbd Isol (Panel C-04)

Standard:

Closes MO-2075 OR MO-2076 by momentarily rotating respective control switch 13A-S1/13A-S2 CCW to the CLOSE position.

Evaluator Note:

Since either valve will effectively isolate the leak and clear the alarm, closing either valve will satisfy the Critical Step.

Evaluator Cue:

As CRS, ACKNOWLEDGE report and INFORM Operator another Operator will complete the remaining steps of this procedure.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

RCIC Steam Line has been isolated and RCIC STEAM LINE HI DIFF PRESS alarm 4-A-05 cleared.

Stop Time:

Historical Record: Updated for the 2016 ILT NRC Exam

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 7 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Simulator Setup (as required):

1. This JPM can be run from the following Standard (Specific) IC sets:
  • Initialize to a Mode 1 IC.
  • Close Inboard RCIC isolation valve MO-2075.
  • Close Trip Throttle valve MO-2080.
  • De-pressurize the line by momentarily placing the handswitch for CV-2079 to OPEN.
  • Once steam line is depressurized return CV-2079 to Close.
  • Close Outboard RCIC isolation valve MO-2076.
  • Insert malfunctions listed in below table.

SIMULATOR - MALFUNCTIONS:

MALF ID MALFUNCTION TITLE DELAY RAMP EVENT FINAL VALUE

1.

RC08 FAILURE OF RCIC TO AUTO ISOLATE (GRP5) 00:00:00 00:00:00 None Active Active

2.

RC07 RCIC STEAM LINE LEAK 00:00:00 00:00:00 1

100 0

SIMULATOR - REMOTE FUNCTIONS:

None.

SIMULATOR - OVERRIDES:

None.

SIMULATOR - TRIGGERS:

1. ZARCPDRN > 0.333 - RCIC Steam Line Pressure > 500 PSIG activates Trigger 1 which causes a RCIC Steam Line rupture.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 8 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the cover page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators

9.

Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 9 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 10 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 2 JPM Number: JPM-B.02.03-011 JPM

Title:

Manually Insert a Group 5 Isolation Examinee & ID:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 11 of 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

Plant is operating in Mode 1.

RCIC was isolated for maintenance and is in the process of being restored.

RP has been notified.

INITIATING CUES:

CRS has directed you to open MO-2075 and MO-2076 in accordance with the B.02.03-05.G.5.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

TURBINE-GENERATOR SYNCHRONIZATION AND LOADING JPM NUMBER:

JPM-C.1-006 REV.

5 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

CR200.126 Synchronize and load the Turbine-Generator K/A NUMBERS:

700000 AA2.08 Rating: SRO/RO:

4.4/4.3 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

Time for Completion:

15 Minutes Time Critical:

No Alternate Path:

Yes TASK APPLICABILITY:

SRO:

RO:

NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 2 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

Reactor is in RUN at about 15% power with one and one-half bypass valves open.

The Main Generator is rolling at approximately 1800 rpm ready for synchronization.

Main Generator Automatic Voltage Regulator is currently out of service.

Plant Management has authorized placing the Main Turbine -Generator on line with the Voltage Regulator in the MANUAL MODE.

Procedure 2167 has been completed through step 126 Steps 121 and 125 are N/Ad due to the voltage regulator being out of service.

Form QF-0023 (Determination for the Use of Not Applicable) for N/Aing Steps 121 and 125 have been completed in accordance with FP-G-DOC-03 (Procedure Use and Adherence).

INITIATING CUES:

CRS directs you to synchronize and load the Main Turbine-Generator commencing with Step 127 Another Operator will record Time and Dates Breaker 8N8 will be closed first.

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 3 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM PERFORMANCE INFORMATION Required Materials:

Marked up copy of 2167 (Part I) showing Steps 119, 120, 122, 123, 124 and 126 completed and Steps 121 and 125 marked as N/A.

General

References:

2167 (Plant Startup)

C.6-008-A-11 (Main Generator Volts/Hz Trouble)

FP-G-DOC-03 (Procedure Use and Adherence)

QF-0023 (Determination for the Use of Not Applicable)

Task Standards:

Main Turbine-Generator has been synchronized to the grid and loaded to ~30 MWe in accordance with 2167 with subsequent manual trip of Main Generator in accordance with C.6-008-A-11 when Voltage Regulator fails such that Generator output voltage exceeds 23.6 KV Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Critical: N Obtain and review Procedure 2167 Part I (Turbine-Generator Synchronization and Loading).

Standard:

Reviews correct procedure and section.

Evaluator Cue:

PROVIDE operator with Marked up copy of 2167 (Part I) showing Steps 119, 120, 122, 123, 124 and 126 completed and Steps 121 and 125 marked as N/A.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 4 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 2 Critical: Y Procedure Step 127.

Place Synchronizing switch to ON, for one of Generator Output Breakers:

  • 8N7/SS, Sync Main Gen Breaker No 1
  • 8N8/SS, Sync Main Gen Breaker No 2
a. OBSERVE Synchronizing pointer moving.
b. OBSERVE Synchronizing Voltmeters and sensing lights activated Standard:

Place Synchronizing switch to ON, for one of Generator Output Breakers:

  • 8N7/SS, Sync Main Gen Breaker No 1
  • 8N8/SS, Sync Main Gen Breaker No 2
a. OBSERVE Synchronizing pointer moving.
b. OBSERVE Synchronizing Voltmeters and sensing lights activated Evaluator Cue:

If necessary repeat that 8N8 should be used for synchronizing per the turnover sheet Evaluator Note:

Per the turnover sheet 8N8 should be used for synchronizing Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical: Y Procedure Step 128.

Use SLCM, Speed Load Changer, to ADJUST the Generator speed until clockwise synchronous pointer rotation established.

Standard:

Momentarily rotates control switch SLCM (located on Panel C-07) as necessary until synchroscope pointer (located on Panel C-08) is rotating CW.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 5 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 4 Critical: Y Procedure Step 129.

Adjust incoming voltage to match running voltage using 270/CS, Regulator Voltage Adjust (C-08).

Standard:

Momentarily rotates control switch 270/CS CW as necessary until incoming voltage approximately matches running voltage.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Critical: N Procedure Step 130.

If speed and voltage conditions are not met, Then Repeat Steps 128 and 129 until speed and voltage conditions are met.

Standard:

Repeats steps 128 and 129 as necessary to meet the standards indicated in Performance Steps 3 & 4.

Evaluator Note:

Candidate is allowed to return to Steps 128 and 129 as necessary to satisfy the standard.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical: N Procedure Step 131.

Allow the synchroscope to make at least two complete revolutions to verify that the synchroscope is operating properly.

Standard:

Observes the pointer on the synchroscope has completed at least two revolutions.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 6 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 7 Critical: Y Procedure Step 132 a.

When the synchroscope pointer is in the Green Band, Then perform the following (loads the generator):

a. PLACE selected Main Generator Output Breaker (8N7 or 8N8) control switch to CLOSE and HOLD.

1). When synchroscope pointer reaches 12 o-clock position, Then RELEASE Main Generator Output Breaker control switch.

2). If breaker does not close on the first attempt, Then PLACE breaker control switch in TRIP a) Verify alarm resets

a. Enter step 130 above 3). If breaker does not close on second attempt, Then DO NOT reset breaker and alarm, a) notify System Engineer.

Standard:

Momentarily rotates control switch 8N8/CS CW to the CLOSE position such that Main Generator output breaker 8N8 closes.

If breaker fails to close on the first attempt, momentarily rotates control switch 8N8/CS CCW to the TRIP position and returns to Step 132.

Evaluator Note:

Operator may utilize two attempts to close breaker. If operator is unsuccessful in closing the breaker after two attempts and the system engineer is contacted the operator can be informed that they may continue to attempt to close the breaker. This is if it appears that the operator has been attempting to correctly close the breaker while the synchroscope is in the green band. If the operator has been incorrectly attempting to sync the generator then mark this step as UNSAT and inform the operator that the JPM is complete Evaluator Cue:

Simulator Operator: When operator closes Breaker 8N8, VERIFY Trigger 1 automatically activates. This will insert the Voltage Regulator RAISE overrides which will drive Generator voltage high out of specification and prevent manual lowering of the voltage regulator.

Simulator Operator: ROLE PLAY: If contacted as System Engineer, ACKNOWLEDGE report and INFORM operator an investigation will be promptly initiated.

Floor Instructor: If operator is unsuccessful in closing the breaker after two attempts, INFORM operator JPM is complete.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 7 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 8 Critical: N Procedure Step 132.b.

Use SLCM, Speed Load Changer to immediately pick up 5% load (about 30 MWe).

Standard:

Momentarily rotates control switch SLCM CW to the RAISE position until Main Generator has been loaded to 25 - 35 MWe.

Observes Generator output on the No. 1 Main Generator Megawatt meter (Panel C-08) and/or the Main Generator Megawatt LED (Panel C-07) is reading ~30 MWe.

Evaluator Note:

MWe may exceed 35 MWe due to the voltage regulator failure. This would not be considered a failure of this step.

Based on recognition of Main Generator voltage rising, this step may not be done.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Critical: N Procedure Step 132.c.

Check generator voltage and current indications are approximately equal for each phase.

Standard:

Observes amperage readings on the three No. 1 Main Generator Phase A/B/C Kiloamp meters (Panel C-08) are approximately equal.

Rotates the Phase Voltage Select Switch VS1 (Panel C-08) CW and/or CCW as necessary and observes voltage readings on all three phases are approximately equal.

Should notice that voltage and MVAR readings are rising and reports this to the CRS.

When annunciator 8-A-11 alarms, reports alarm and pulls associated ARP.

Evaluator Cue:

Floor Instructor: If operator reports Main Generator voltage and MVAR rising and/or alarm, ACKNOWLEDGE report.

Simulator Operator: When Main Generator output voltage rises to 23.1 KV, VERIFY Trigger 2 automatically activates. This will cause the Main Generator Volts/Hz Trouble annunciator (8-A-11) to alarm.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 8 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 10 Critical: N ALTERNATE PATH Obtain and review ARP C.6-008-A-11 (Main Generator Volts/Hz Trouble).

Standard:

Announces alarm.

Obtains and reviews correct Alarm Response Procedure.

Evaluator Cue:

As CRS acknowledge communication Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 Critical: N (C.6-008-A-11) Procedure Step 1.

Perform the following:

Standard:

Starts to perform Step 1 of ARP.

Evaluator Cue:

When operator starts to perform Step 1 of the ARP, INFORM him another operator has completed Step 1.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 Critical: N (C.6-008-A-11) Procedure Step 2.

If the Generator is ON-LINE, Then reduce excitation to lower generator output voltage to < 23.1 KV.

Standard:

Momentarily rotates control switch 270/CS CCW to the LOWER position.

Observes no response from the Voltage Regulator.

Observes Main Generator voltage and MVARs continue to rise.

Evaluator Cue:

As CRS acknowledge communication Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 9 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 13 Critical: Y (C.6-008-A-11) Procedure Step 2.a.

If actions taken to lower output voltage are not effective, And Generator output voltage is 23.6 KV, Then trip the Generator using the GENERATOR EMERGENCY TRIP handswitch. (C-08).

Standard:

Momentarily rotates control switch GT/CS CW or CCW to the TRIP position.

Evaluator Cue:

Floor Instructor: As CRS, ACKNOWLEDGE report.

Floor Instructor: When operator trips the Main Generator, INFORM him another operator will complete remaining portions of procedures.

Simulator Operator: When Operator trips Main Generator, VERIFY Triggers 3 and/or 4 automatically activate. This will delete the Main Generator voltage indication override.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When the Main Generator is manually tripped inform the operator that the JPM is complete Stop Time:

Historical Record:

Updated for 2167 Revision 94 and 2016 ILT NRC Exam Removed Performance Steps for 2167 that are not performed due to the alternate path

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 10 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Simulator Setup (as required):

1. This JPM can be run from the following Standard (Specific) IC sets:

Initialize to a startup IC-171 or IC with Reactor Power at ~15% and Turbine at ~1800 RPM and ready for synchronization.

Ensure the AUTO/MAN REGULATOR SELECTOR switch is in the MAN position with the WHITE light ON.

Ensure the Power Stabilizer is removed from service.

Acknowledge alarm 8-A-31 (Voltage Regulator Manual Mode) and hang caution tag on the AUTO/MAN REGULATOR SELECTOR switch.

Adjust Voltage Regulator and Speed/Load Changer as necessary such that incoming voltage is ~2 volts less than running voltage and synchroscope is moving slowly in the counterclockwise direction.

Ensure the Turbine Speed & Bypass Valve Cam Position recorder is selected for the Turbine Speed display.

Insert malfunctions & triggers listed in below tables.

SIMULATOR - MALFUNCTIONS:

MALF ID MALFUNCTION TITLE DELAY RAMP EVENT FINAL VALUE

1.

C-08-A11 MAIN GENERATOR VOLTZ/HZ TROUBLE 00:00:00 00:00:00 2

Active InActive SIMULATOR - REMOTE FUNCTIONS:

None SIMULATOR - OVERRIDES:

OVR ID MALFUNCTION TITLE DELAY RAMP EVENT FINAL VALUE

1.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:00:00 00:00:00 1

True False

2.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:00:07 00:00:00 1

True False

3.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:00:14 00:00:00 1

True False

4.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:00:21 00:00:00 1

True False

5.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:00:28 00:00:00 1

True False

6.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:00:35 00:00:00 1

True False

7.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:00:42 00:00:00 1

True False

8.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:00:49 00:00:00 1

True False

9.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:00:56 00:00:00 1

True False

10.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:01:03 00:00:00 1

True False

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 11 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

OVR ID MALFUNCTION TITLE DELAY RAMP EVENT FINAL VALUE

11.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:01:10 00:00:00 1

True False

12.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:01:17 00:00:00 1

True False

13.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:01:24 00:00:00 1

True False

14.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:01:31 00:00:00 1

True False

15.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:01:38 00:00:00 1

True False

16.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:01:45 00:00:00 1

True False

17.

05-S069-01 MANUAL VOLTAGE ADJUST -

LOWER 00:00:00 00:00:00 1

False False SIMULATOR - TRIGGERS:

1.

ZL_8N5R2 - Breaker 8N8 breaker closed RED lamp LIT ACTIVATES Trigger 1. This inserts a series of overrides to the Voltage Regulator manual adjustment such that Main Generator output voltage rises and prevents manual lowering of the Voltage Regulator.

2.

ZAVMMG > 0.75 - Main Generator output voltage rising to 23.1 KV ACTIVATES Trigger 2. This causes the Main Generator Volts/Hz Trouble annunciator (8-A-11) to alarm.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 12 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the cover page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators

9.

Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 13 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 2 JPM Number: JPM-C.1-006 JPM

Title:

Turbine-Generator Synchronization and Loading Examinee & ID:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 14 of 14 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

Reactor is in RUN at about 15% power with one and one-half bypass valves open.

The Main Generator is rolling at approximately 1800 rpm ready for synchronization.

Main Generator Automatic Voltage Regulator is currently out of service.

Plant Management has authorized placing the Main Turbine -Generator on line with the Voltage Regulator in the MANUAL MODE.

Procedure 2167 has been completed through step 126 Steps 121 and 125 are N/Ad due to the voltage regulator being out of service.

Form QF-0023 (Determination for the Use of Not Applicable) for N/Aing Steps 121 and 125 have been completed in accordance with FP-G-DOC-03 (Procedure Use and Adherence).

INITIATING CUES:

CRS directs you to synchronize and load the Main Turbine-Generator commencing with Step 127 Another Operator will record Time and Dates Breaker 8N8 will be closed first.

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

PERFORM THE AREA RADIATION MONITOR FUNCTIONAL TEST JPM NUMBER:

JPM-B.05.12-001 REV.

3 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

CR272.102 Perform the Area Radiation Monitor Functional Test K/A NUMBERS:

272000 A4.02 Rating: SRO/RO:

3.0/3.0 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

Time for Completion:

25 Minutes Time Critical:

No Alternate Path:

No TASK APPLICABILITY:

SRO:

RO:

NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 2 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

Plant is operating at 100% power.

Maintenance was performed on ARM Channel A1 and it requires PMT.

INITIATING CUES (IF APPLICABLE):

The CRS has directed you to perform Test 1025-A (Area Radiation Monitor Functional), Steps 1, 2, 4 and 6 for ONLY Channel A1.

The Evaluator will act as the second operator

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 3 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM PERFORMANCE INFORMATION Required Materials:

Copy of Test 1025-A (Area Radiation Monitor Functional)

Initiating Approval to commence In the comments state the performance of this test is for ONLY Detector A1 to satisfy PMT following maintenance.

Check other as the reason for performing.

STEPS 3, 5, and 7-11 should be marked N/A General

References:

Ops Manual B.05.12 ARM Alarm Setpoint Sheet (Operator Aid posted on panel)

Task Standards:

Test 1025-A (Area Radiation Monitor Functional)

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Critical: N Obtains copy of Test 1025-A, APRM Functional Standard:

Obtains copy of Test 1025-A, most recent revision.

Evaluator Cue:

Provides an initiated copy of the current revision of Test 1025-A.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 4 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 2 Critical: N Procedure Step 1:

If local alarms/indication will be affected during performance of this test, And personnel will NOT be present at the local alarms/indication, Then announce over the page that Area Radiation Monitor testing will begin.

Standard:

Makes plant announcement Evaluator Note:

This step should be simulated to minimize simulator distractions.

Evaluator Cue:

State that the plant announcement has been made.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical: N Procedure Step 2.a:

Turn the TRIP CHECK ADJUST knob on the power supply fully counter-clockwise, And then 1/4 turn clockwise.

Standard:

Turn the TRIP AND ADJUST knob on the power supply fully counter-clockwise, And then 1/4 turn clockwise.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical: Y Procedure Step 2.b:

While depressing TRIP CHECK button on Indicator and Trip unit being tested, turn TRIP CHECK ADJUST knob on corresponding power supply unit slowly counter-clockwise until the downscale trip occurs.

Standard:

Simultaneously depress the TRIP CHECK button on the Indicator and Trip unit And turn the TRIP CHECK ADJUST knob on the power supply unit slowly counter-clockwise until the downscale trip occurs.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 5 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 5 Critical: N Procedure Step 2.c:

Record the recorder reading at which the downscale trip occurred in the column labeled mr/hr under SECTION I of Figure 1 (Acceptance Range +

30%).

Standard:

Record the recorder reading (0.1 to 0.13) at which the downscale trip occurred in the column labeled mr/hr under SECTION I of Figure 1.

Evaluator Cue:

When examinee requests the reading on the paperless digital recorder, state that it reads the same as the meter being adjusted.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical: N Procedure Step 2.d:

Verify that the downscale alarm light on the Indicator and Trip unit is ON by recording initials in the column labeled LT under SECTION I of Figure 1.

Standard:

Records initials under LT column.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical: N Procedure Step 2.e:

Verify that annunciator 4-A-31 (Area Monitor Downscale) is in ALARM by recording initials in the column labeled ANN under SECTION I of Figure 1.

Standard:

Records initials.

Evaluator Cue:

State that 4-A-31 is in alarm.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 6 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 8 Critical: Y Procedure Step 2.f:

While depressing TRIP CHECK button on indicator and trip unit being tested, turn TRIP CHECK ADJUST knob on corresponding power supply unit clockwise to just above the low trip set point, And leave in this condition.

Standard:

Adjusts trip check adjust knob.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Critical: Y Procedure Step 2.g:

Depress the RESET button on the Indicator and Trip unit, And verify the downscale light is OFF and annunciator 4-A-31 (Area Monitor Downscale) is RESET.

Standard:

Verifies annunciator is reset.

Evaluator Cue:

Inform examinee that 4-A-31 is reset.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Critical: N Procedure Step 2.h:

Circle all downscale meter readings that do not fall within the acceptance criteria of +/-30% of the downscale setpoint on posted ARM setpoint sheet.

Standard:

Circles out of acceptance readings.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 7 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 11 Critical: Y Procedure Step 4.a:

While depressing TRIP CHECK button on the Indicator and Trip unit being tested, turn TRIP CHECK ADJUST knob on the power supply unit clockwise until the upscale trip occurs.

Standard:

Adjusts until upscale trip occurs.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 Critical: N Procedure Step 4.b:

Record the recorder reading at which the upscale trip occurred in the column labeled mr/hr under SECTION II of Figure 1.

Standard:

Records meter reading (14 to 26).

Evaluator Cue:

If examinee requests the reading on the paperless digital recorder, state that it reads the same as the meter being adjusted.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 Critical: N Procedure Step 4.c:

Verify the upscale light on the Indicator and Trip unit is ON by recording initials in the column labeled LT under SECTION II of Figure 1.

Standard:

Verifies upscale light is ON.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 8 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 14 Critical: N Procedure Step 4.d:

Verify the appropriate annunciator is in ALARM by recording initials in column labeled ANN under SECTION II of Figure 1.

Standard:

Verifies alarm and initials form.

Evaluator Cue:

Inform examinee that appropriate annunciator is in alarm.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 15 Critical: N Procedure Step 4.e:

From the SPDS display while TRIP CHECK button is depressed and upscale trip is in alarm, record readings in the mr/hr column and verify alarm condition received by recording initials in the applicable column under SECTION III of Figure 1(Acceptance Criteria + 30%).

Standard:

Records readings from SPDS.

Evaluator Cue:

Inform examinee that SPDS reads 20 mr/hr.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 16 Critical: Y Procedure Step 4.f:

While depressing TRIP CHECK button on indicator and trip unit being tested, turn TRIP CHECK ADJUST knob on corresponding power supply unit counter-clockwise to just below the high trip set-point, And leave in this condition.

Standard:

Adjusts trip check adjust knob.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 9 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 17 Critical: Y Procedure Step 4.g:

Depress the RESET button on the Indicator and Trip unit, And verify the upscale light is OFF and appropriate annunciator is RESET.

Standard:

Resets the annunciator.

Evaluator Cue:

Inform examinee that appropriate annunciator is reset.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 18 Critical: N Procedure Step 4.h:

Circle all upscale meter readings that do not fall within the acceptance criteria of +/-30% of the upscale setpoint on posted ARM setpoint sheet.

Standard:

Circles out of acceptance readings.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 19 Critical: N Procedure Step 4.i:

From the SPDS display, verify alarm conditions are cleared form ARMs A1 through A21, B1 through B5, C1 through C3, and D1 under SECTION III of Figure 1.

Standard:

Verifies alarm conditions are clear Evaluator Cue:

Inform examinee that all SPDS alarms are clear.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 20 Critical: N Procedure step 6 Announce over the page that Area Radiation Monitor testing is complete.

Standard:

Makes plant announcement.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 10 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 21 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Standard:

Operator informs evaluator that the task is completed.

Evaluator Cue:

Acknowledge that the task has been completed.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

Candidate informs evaluator JPM is complete.

Stop Time:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 11 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Historical Record:

Procedure and Template updates for 2016 ILT NRC Exam.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 12 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Simulator Setup (as required):

1. This JPM can be run from the following Standard (Specific) IC sets:
  • Mode 1 IC SIMULATOR INPUT

SUMMARY

Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 13 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the cover page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators

9.

Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 14 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 2 JPM Number: JPM-B.05.12-001 JPM

Title:

Perform the Area Radiation Monitor Functional Test Examinee & ID:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 15 of 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

Plant is operating at 100% power.

Maintenance was performed on ARM Channel A1 and it requires PMT.

INITIATING CUES (IF APPLICABLE):

The CRS has directed you to perform Test 1025-A (Area Radiation Monitor Functional), Steps 1, 2, 4 and 6 for ONLY Channel A1.

The Evaluator will act as the second operator

QF1075-01 Rev. 5 (FP-T-SAT-75)

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

MANUALLY INITIATE SBGT A TRAIN JPM NUMBER:

JPM-B.04.02-003 REV.

10 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

CR261.102 SBGT A(B) Train Quarterly Test K/A NUMBERS:

261000 A4.07 Rating: SRO/RO:

3.2/3.1 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

Time for Completion:

15 Minutes Time Critical:

No Alternate Path:

No TASK APPLICABILITY:

SRO:

RO:

NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 2 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 3 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

INITIAL CONDITIONS:

The Reactor is at power SBGT needs to be manually started to support Test 0213 (Drywell To Suppression Chamber Vacuum Breaker Leakage Operational Check)

You are the Balance of Plant operator INITIATING CUES:

The CRS directs you to perform STEPs 1-4 of the B.04.02-05.D.3 to manually initiate SBGT A Train.

Simulator Setup Instructions:

No other simulator setup is needed; perform from any at-power IC

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 4 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM PERFORMANCE INFORMATION Required Materials:

None General

References:

B.04.02-05 Task Standards:

Manually Initiate SBGT A Train Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Critical: N Locate procedure B.04.02-05, Manually Initiate SBGT A Train Operator obtains and reviews procedure.

Standard:

Obtains appropriate procedure.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Critical: N Operator reviews prerequisites No painting has occurred within Reactor Building for at least 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, Or If painting has occurred within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of SBGT operation, Then notify the SCTMT System Engineer to evaluate the effect on the charcoal filters.

Standard:

Evaluate prerequisite Evaluator Cue:

When asked, state that no painting has occurred in the Reactor Building for at least 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 5 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 3 Critical: Y (Procedure B.04.02-05 D.3, STEP 1)

1. Position the following handswitches:
a. HS-2945, AO-2945, to OPEN
b. HS-2979, AO-2979, to OPEN
c. HS-2955, Filter Heater E-34A-1, to ON
d. HS-2983A, V-EF-17A (SBGT Exh Fan), to ON Standard:

Positions the following handswitches:

HS-2945, AO-2945, to OPEN HS-2979, AO-2979, to OPEN HS-2955, Filter Heater E-34A-1, to ON HS-2983A, V-EF-17A (SBGT Exh Fan), to ON Evaluator Note:

Filter heater does not come on until V-EF-17 is started.

Valves wont reposition until SBGT A is placed in Manual on the next step Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical: Y (Procedure B.04.02-05 D.3, STEP 2)

2. Place HS-2988A, A STBY Gas Train Mode Switch, in Position 1 (MANUAL), and verify blue light ON.

Standard:

Places HS-2988A in Position 1 (MANUAL)

(Non-Critical portion of Standard)

Verifies that blue light is on Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 6 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 5 Critical: N (Procedure B.04.02-05 D.3, STEP 3)

3. VERIFY red light above HS-2955 is ON.

Standard:

Verifies red light above HS-2955 is ON Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical: N (Procedure B.04.02-05 D.3, STEP 4)

4. VERIFY one of the following indicates flow:
a. FIC-2943, SBGT A Loop Flow Control
b. FIC-2942, SBGT B Loop Flow Control Standard:

Verifies flow is indicated on FIC-2943 for SBGT A Loop Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Standard:

Operator informs evaluator that the task is completed.

Evaluator Cue:

Acknowledge Report Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

Stop Time:

Historical Record:

Revised to align with Revision 35 of B.04.02-05 for the 2016 ILT NRC Exam

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 7 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Simulator Setup (as required):

1. This JPM can be run from the following Standard (Specific) IC sets:
  • IC-* (IC-*), (IC Conditions Summary)

SIMULATOR INPUT

SUMMARY

Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 8 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the cover page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators

9.

Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 9 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 2 JPM Number: JPM-B.04.02-003 JPM

Title:

Manually Initiate SBGT A Train Examinee & ID:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 10 of 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

The Reactor is at power SBGT needs to be manually started to support Test 0213 (Drywell To Suppression Chamber Vacuum Breaker Leakage Operational Check)

You are the Balance of Plant operator INITIATING CUES:

The CRS directs you to perform STEPs 1-4 of the B.04.02-05.D.3 to manually initiate SBGT A Train.

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

FIRE WATER CROSS-TIE TO LPCI JPM NUMBER:

JPM-C.5-3203-001 REV.

15 RELATED PRA INFORMATION:

PRA-ALT-INJ-LY TASK NUMBERS /

TASK TITLE(S):

CR314.110 / NL314.106 Use Alternate Injection Systems For RPV Makeup K/A NUMBERS:

295031 EA1.08 Rating: SRO/RO:

3.9 / 3.8 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

Time for Completion:

15 Minutes Time Critical:

No Alternate Path:

No TASK APPLICABILITY:

SRO:

RO:

NLO Additional site-specific signatures may be added as desired.

Developed by:

Ronald C. Newberry Developer Date Validated by:

Validator (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Chris Peterson Training Supervisor Date

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 2 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM Number: JPM-C.5-3203-001 JPM

Title:

Fire Water Cross-Tie To LPCI Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 3 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM BRIEFING/TURNOVER Provide briefing/turnover in accordance with applicable program description and/or training procedure.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

An emergency condition exists requiring the use of Alternate Injection Systems for RPV Makeup.

The Diesel Fire Pump is operating supplying the Fire Header.

RHRSW is NOT supplying RHR.

INITIATING CUES:

The CRS directs you to perform the IN-PLANT steps for lining up the Fire Water system for LPCI Injection using PART D of C.5-3203.

ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.

EVALUATOR NOTE: Some steps in this procedure require the use of a ladder. To prevent the inadvertent bumping of plant equipment, use of the ladder MUST BE SIMULATED.

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 4 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM PERFORMANCE INFORMATION Required Materials:

Copy of Procedure C.5-3203, PART D General

References:

C.5-3203 (Use of Alternate Injection Systems for RPV Makeup), Rev. 16 Task Standards:

Fire Water has been lined up to LPCI injection in accordance with Procedure C.5-3203, Section D.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Critical: N Review controlled copy of Procedure C.5-3203, Section D (Fire Water Cross-Tie to LPCI).

Standard:

Reviews correct procedure and section.

Evaluator Cue:

Provide operator with copy of procedure C.5-3203, PART D.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Critical: N Procedure STEP 1.

CLOSE RHRSW-13, EMER INJECTION LEAKAGE TELL TALE.

Standard:

Proceeds to the 931 level of the Turbine Building.

Rotates handwheel for RHRSW-13 CW until valve is fully CLOSED.

Evaluator Cue:

INFORM operator that RHRSW-13 moves in clockwise direction, stem lowers, meets resistance and is tight.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 5 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 3 Critical: N Procedure STEP 2.

Verify CLOSED the following valves:

RHRSW-12, EMERGENCY INJECTION VIA A RHRSW LOOP.

RHRSW-68, RHRSW EMERGENCY FLEX INJECTION ISOLATION VALVE.

Standard:

Attempts to rotate handwheel for RHRSW-12 CW.

Attempts to rotate handwheel for RHRSW-68 CW.

Evaluator Note:

A stepladder designated for this procedure is located by door 40. When operator goes to obtain the ladder, indicate that the ladder is in position.

Evaluator Cue:

When operator attempts to rotate respective handwheel, INFORM him resistance is felt and valve does NOT turn.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical: N Procedure STEP 3.

Verify CLOSED the following valves:

MO-2020, RHR DIV 1 DRYWELL SPRAY - OUTBOARD.

MO-2006, RHR DIV 1 DISCHARGE TO TORUS - OUTBOARD.

MO-2021, RHR DIV 2 DRYWELL SPRAY - OUTBOARD.

MO-2007, RHR DIV 2 DISCHARGE TO TORUS - OUTBOARD.

Standard:

Contacts Control Room to verify status of the listed valves.

Evaluator Cue:

As Control Room Operator, REPORT MO-2020, MO-2006, MO-2021 and MO-2007 indicate CLOSED.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 6 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 5 Critical: Y Procedure STEP 4.

OPEN the following valves:

RHRSW-46, EMERGENCY INJECTION VIA DIESEL FIRE PUMP RHRSW-14, EMERGENCY INJECTION VIA A RHRSW LOOP Standard:

Rotates handwheel for RHRSW-46 CCW until valve is OPEN.

Rotates handwheel for RHRSW-14 CCW until valve is OPEN.

Evaluator Note:

A stepladder designated for this procedure is located by door 40. When operator goes to obtain the ladder, indicate that the ladder is in position.

Evaluator Cue:

INFORM operator that the respective valve moves in the counter clockwise direction, stem rises, meets resistance and is tight.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical: N Procedure STEP 5.

If injecting through RHR-A Standard:

Informs Control Room that Firewater is lined up to LPCI.

Evaluator Cue:

When operator proceeds to Procedure Step 5, INFORM him that the Control Room will complete the procedure.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Standard:

Operator informs evaluator that the task is completed.

Evaluator Cue:

Acknowledge that the task has been completed.

Evaluator Note:

DO NOT PROMPT Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 7 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Terminating Cues: Firewater is cross-tied to RHRSW.

Stop Time:

Historical Record: Revision 15 Updated to latest standards, JPM template and procedural revisions.

Changed Performance Step 2 to NON-CRITICAL since leaving the tell-tale drain open would NOT prevent injecting Fire Water using LPCI.

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 8 of 9 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

TURNOVER SHEET INITIAL CONDITIONS:

An emergency condition exists requiring the use of Alternate Injection Systems for RPV Makeup.

The Diesel Fire Pump is operating supplying the Fire Header.

RHRSW is NOT supplying RHR.

INITIATING CUES:

The CRS directs you to perform the IN-PLANT steps for lining up the Fire Water system for LPCI Injection using PART D of C.5-3203.

ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 9 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the cover page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators

9.

Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

PREPARE THE CRD SYSTEM FOR ALTERNATE BORON INJECTION JPM NUMBER:

JPM-C.5-3102-001 REV.

0 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

NL314.102 Perform actions associated with Alternate Boron Injection with CRD K/A NUMBERS:

295037 EA1.10 Rating: SRO/RO:

3.7/3.9 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

Time for Completion:

20 Minutes Time Critical:

No Alternate Path:

No TASK APPLICABILITY:

SRO:

RO:

NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 2 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev.0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The plant is in a condition where boron injection is required and the SBLC system is not available.

The SBLC tank is at 1500 gallons. It is filled with enriched boron solution that met the concentration requirements of Technical Specification 3.4.B. the last time it was checked.

No. 11 CRD pump is in service and No. 12 CRD pump is not running.

You are an extra operator on shift INITIATING CUES (IF APPLICABLE):

The CRS directs you to prepare the CRD System for alternate boron injection using 11 CRD pump with procedure C.5-3102 (ALTERNATE BORON INJECTION WITH CRD) Steps 1 through 2.g.

Another operator will complete the procedure INFORM THE EVALUATOR WHEN THE TASK IS COMPLETE.

ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 3 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM PERFORMANCE INFORMATION Required Materials:

C.5-3102, Part A General

References:

C.5-3102 Task Standards:

Prepare the CRD System for Alternate Boron Injection Using No. 11 CRD Pump Start Time:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 4 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Critical N Locates procedure C.5-3102 (Alternate Boron Injection With CRD).

Standard:

Locates Appropriate Procedure Evaluator Cue:

Provide the Operator with a copy of the procedure (C.5-3102).

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Critical: N (Procedure STEP 1)

If the SBLC tank level is less than 1000 Gallons, Then fill it using PART B, And perform steps 2.a. through 2.l. of PART A concurrently.

Standard:

Operator should not perform PART B. (1500 gal given in initial conditions)

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical: N (Procedure STEP 2a)

Prepare the CRD system for alternate injection by performing the following:

If a CRD pump is required, Then verify 11 CRD pump is operating.

Standard:

Verifies 11 CRD pump operating (given in initial conditions)

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 5 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 4 Critical: N (Procedure STEP 2b)

If 12 CRD pump is operating, Then STOP 12 CRD pump.

Standard:

Recognizes step is not applicable and N/As step Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Critical: Y (Procedure STEP 2c)

Verify CLOSED the following valves:

CRD-2-2, 12 CRD PUMP SUCT CRD-3-2, 12 CRD PUMP DISCHARGE THROTTLE CST-147, CST CUNO FILTER OUT TO 12 CRD PUMP CRD-45, CRD PUMPS SEAL WTR XTIE CRD-7-2, 12 CRD PUMP RECIRC TO CST CRD-7-1, 11 CRD PUMP RECIRC TO CST CRD-168, CRD PUMP BYPASS ISOL Standard:

1. Closes CRD-2-2 by turning handwheel full travel clockwise, And
2. Closes CRD-3-2 by turning handwheel full travel clockwise, And
3. Closes CRD-45 by turning handwheel full travel clockwise, And
4. Closes CRD-7-2 by turning handwheel full travel clockwise, And
5. Closes CRD-7-1 by turning handwheel full travel clockwise And
6. Closes CRD-168 by turning handwheel full travel clockwise.

(Non-Critical portion of Standard)

Verifies CST-147 closed by noting valve stem full in and attempting to turn handwheel in the clockwise direction.

Evaluator Cue:

1. For CRD-2-2, CRD-3-2, CRD-45 and CRD-168 that are open and need to be closed; the valve stems move IN, meet resistance and are tight.
2. For CST-147; the valve is tight.
3. For CRD-7-1 and CRD-7-2;, the valve stems move IN, meet resistance and are tight.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 6 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 6 Critical: Y (Procedure STEP 2d)

OPEN CRD-46-2, 12 CRD PUMP OTBD VENT Standard:

Opens CRD-46-2 Evaluator Cue:

Valve turns CCW and then meets resistance Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical: Y (Procedure STEP 2e)

Remove the pipe cap on the 1 in. vertical line (in CRD Pump Room between CRD-2-2 and the Y-strainer 3-15B).

Standard:

Using a wrench, removes pipe cap from 1 in. line by turning CCW.

Evaluator Note:

Pipe wrench is located on CRD PUMP HOSE CART at top of stairway entrance to the CRD Pump room.

Evaluator Cue:

Pipe cap turns CCW, the pipe cap is removed.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Critical: Y (Procedure STEP 2f)

CLOSE CRD-46-2 Standard:

Closes CRD-46-2 Evaluator Cue:

Valve turns CW and then meets resistance Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 7 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 9 Critical: Y (Procedure STEP 2g)

Connect the union end of the hose from the CRD PUMP HOSE CART (top of stairway entrance to CRD Pump Room) to the 1 In vertical line (in CRD Pump Room between CRD-2-2 and the Y-strainer 3-15B).

1. Install TEE # 1 - CRD SUCTION LINE VENT with vent valve to 1 inch vertical line. (Tee stored on CRD PUMP HOSE CART) at stairway entrance to CRD pump room.)
2. Connect hose union tee.
3. Verify 1 inch vertical line vent valve is CLOSED.

Standard:

Installs tee and connects union end of hose to the 1 In. vertical line by threading on and tightening with wrench in the CW direction.

Evaluator Cue:

Union end of hose threads onto 1 In. vertical line, turns CW and is tight.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 28 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Standard:

Informs evaluator that the task is completed.

Evaluator Note:

DO NOT PROMPT Evaluator Cue:

Acknowledge task is complete Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When report is made that the task is complete, state the JPM is complete Stop Time:

Historical Record: New Create for the 2016 ILT NRC Exam

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 8 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Simulator Setup (as required):

1. This JPM can be run from the following Standard (Specific) IC sets:
  • IC-* (IC-*), (IC Conditions Summary)

SIMULATOR INPUT

SUMMARY

Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 9 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the cover page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators

9.

Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 10 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 2 JPM Number: JPM-C.5-3102-002 JPM

Title:

Prepare the CRD System for Alternate Boron Injection Examinee & ID:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 11 of 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

The plant is in a condition where boron injection is required and the SBLC system is not available.

The SBLC tank is at 1500 gallons. It is filled with enriched boron solution that met the concentration requirements of Technical Specification 3.4.B. the last time it was checked.

No. 11 CRD pump is in service and No. 12 CRD pump is not running.

You are an extra operator on shift INITIATING CUES (IF APPLICABLE):

The CRS directs you to prepare the CRD System for alternate boron injection using 11 CRD pump with procedure C.5-3102 (ALTERNATE BORON INJECTION WITH CRD) Steps 1 through 2.g.

Another operator will complete the procedure INFORM THE EVALUATOR WHEN THE TASK IS COMPLETE.

ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 1 of 12 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

MANUAL CONTROL OF RHRSW CV-1729 JPM NUMBER:

JPM-B.08.01.03-001 REV.

10 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

NL205.118 Take Manual Control of the RHRSW Control Valves, CV-1728 and CV-1729 upon Failure of SV-1728 or SV-1729 K/A NUMBERS:

205000 A2.08 Rating: SRO/RO:

3.3/3.5 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

Time for Completion:

20 Minutes Time Critical:

No Alternate Path:

No TASK APPLICABILITY:

SRO:

RO:

NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 2 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM Number: JPM-B.08.01.03-001 JPM

Title:

Manual Control of RHRSW CV-1729 Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 3 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The Reactor is shutdown and <212F. The No. 12 RHR Heat Exchanger Control valve CV-1729 solenoid valve SV-1729 has failed. The No. 11 and No. 13 RHR pump breakers have been previously removed for breaker maintenance. Shutdown cooling is desired at this time.

INITIATING CUES:

The Control Room Supervisor directs you to assume manual control of RHR Heat Exchanger RHRSW control valve CV-1729 in accordance with B.08.01.03-05.H.3.

ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 4 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM PERFORMANCE INFORMATION Required Materials:

Copy of Procedure B.08.01.03-05, Section H.3 (Taking Manual Control of RHRSW Control Valves CV-1728 and CV-1729 Upon Failure of SV-1728 or SV-1729)

Copy of B.08.01.03-06 Figure 2 (RHRSW Control Valve General

References:

B.08.01.03-05 (RHR Service Water System-System Operation)

Task Standards:

Manual control of CV-1729 is established and valve position is set correctly for plant conditions Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Critical: N Locate Procedure B.08.01.03-05.H.3, "Taking Manual Control of RHRSW Control Valves, CV-1728 and CV-1729 Upon Failure of SV-1728 or SV-1729."

Standard:

Locates and reviews the appropriate procedure.

Determines Part B is the appropriate procedure for the task Evaluator Cue:

When operator locates (or provides a verbal description of the location) controlled copy of procedure and section, PROVIDE operator copy of section H.2 of procedure B.08.01.03-05.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 5 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 2 Critical: Y (Procedure PART B, STEP 11)

Obtain key to unlock handwheel on CV-1729, 12 RHRSW Outlet.

Standard:

Obtains key No. 41 from operator key ring or the W.E.C.

Evaluator Cue:

If operator requests key from the W.E.C, INFORM operator that they have the key.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical: N (Procedure STEP 12)

Establish communications between B RHR Room and Control Room Standard:

Establishes radio communication between the Control Room and himself from the B RHR room.

Evaluator Cue:

When operator describes where to find a radio, INFORM them that radio communication is established between Control Room and B RHR room.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical: Y (Procedure STEP 13)

NOTE: Completion of following step will result in CV-1729's brass handwheel screw holding valve closed via engagement with valve stem.

Unlock the handwheel on CV-1729 (see Ops Man Section B.08.01.03-06, Figure 2 - RHRSW Control Valve),

And turn it clockwise until resistance is felt.

Standard:

Unlocks the valve handwheel for CV-1729.

Rotates the valve handwheel for CV-1729 clockwise until resistance is felt.

Evaluator Cue:

Handwheel is unlocked.

CV-1729 handwheel rotates clockwise and resistance is felt.

Evaluator Note:

Operator does not have to examine figure in Ops Manual if they are familiar with the equipment.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 6 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 5 Critical: Y (Procedure STEP 14)

CAUTION Do not dead head pumps for more than 7 minutes.

Turn the air supply valve to the "MANUAL" position. (See Ops Man Section B.08.01.03-06, Figure 2 - RHRSW Control Valve for location of the air supply valve).

Standard:

Turns the air supply valve to the MANUAL position.

Evaluator Cue:

Air supply valve is in the MANUAL position.

Evaluator Note:

Operator does not have to examine Ops Manual figure if they are familiar with the equipment.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical: N (Procedure STEP 15)

Notify Control Room of the following:

a) Control valve CV-1729 is ready for manual operation, b) RHRSW pump may be started.

Standard:

Notifies the Control Room CV-1729 is ready for manual operation, And Notifies the Control Room, the RHRSW pump is ready to be started.

Evaluator Cue:

As the Control Room, acknowledge the report that CV-1729 is ready for manual operation and the RHRSW pump may be started.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 7 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 7 Critical: N (Procedure STEP 16)

START an RHRSW pump per Ops Man B.08.01.03-05.D.1, Startup Procedure - Startup of RHRSW Pumps.

Standard:

None Evaluator Cue:

As the Control Room, INFORM the operator that Control Room Operators have started the No. 12 RHRSW pump.

Evaluator Note:

It is not the intent of this JPM for the operator to perform action in the Intake for starting of a RHRSW pump Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Critical: Y (Procedure STEP 17)

Open CV-1729 to obtain the desired flow rate by turning the valve handwheel in the counterclockwise direction.

No. of Approximate Pumps Flowrate Valve Position 1

3500 gpm 55% open 2

7000 gpm 85% open Standard:

Opens CV-1729 by turning the valve handwheel CCW until valve position is at 55%.

Evaluator Cue:

Valve position indicates approximately 55%. Flow rate is 3500 GPM.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 8 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 9 Critical: N (Procedure STEP 18)

Verify that RHR HX tube-to-shell side dP is greater than 20 psid by checking DPIS-10-92B (local instrument rack), AND adjust valve position, as required.

Standard:

Verifies DP is greater than 20 psid by checking dPIS-10-92B.

Evaluator Cue:

When operator checks dPIS-10-92B, INFORM the operator that the dPIS indicates 40 psid.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Critical: Y (Procedure STEP 19)

Lock handwheel for CV-1729 in position.

Standard:

Locks the handwheel in position.

Evaluator Cue:

Handwheel is locked in position.

Evaluator Note:

The valve position may drift unless the handwheel is locked.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 Critical: N (Procedure STEP 20)

NOTE: Valve CV-1729 is now locked in position at desired flow rate. An operator does not need to be stationed at valve continuously.

Monitor system flowrate from Control Room.

Standard:

None Evaluator Cue:

Flowrate is being monitored from the Control Room.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 9 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 12 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Standard:

Operator informs evaluator that the task is completed.

Evaluator Cue:

ACKNOWLEDGE that the task has been completed.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

Stop Time:

Historical Record:

Revision 11 updated JPM to newest revision of QF-1075-01

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 10 of 12 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

TURNOVER SHEET INITIAL CONDITIONS:

The Reactor is shutdown and <212F. The No. 12 RHR Heat Exchanger Control valve CV-1729 solenoid valve SV-1729 has failed. The No. 11 and No. 13 RHR pump breakers have been previously removed for breaker maintenance. Shutdown cooling is desired at this time.

INITIATING CUES:

The Control Room Supervisor directs you to assume manual control of RHR Heat Exchanger RHRSW control valve CV-1729 in accordance with B.08.01.03-05.H.3.

ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 11 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Simulator Setup (as required):

1. This JPM can be run from the following Standard (Specific) IC sets:
  • IC-* (IC-*), (IC Conditions Summary)

SIMULATOR INPUT

SUMMARY

Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 12 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the cover page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators

9.

Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date