ML18153A526: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18153A526
| number = ML18153A526
| issue date = 03/31/1997
| issue date = 03/31/1997
| title = Rev 0 of COLR Surry 1,Cycle 15 Pattern Lt.
| title = Rev 0 of COLR Surry 1,Cycle 15 Pattern Lt
| author name =  
| author name =  
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:*
{{#Wiki_filter:*
* CORE OPERATING LIMITS REPORT Surry 1 Cycle 15 Pattern LT Rev O March 1997 9704300004 970424 PDR ADOCK 05000280 P              PDR S1Cl5/LT COLR  Rev 0 Page 1 of 6
9704300004 970424 PDR ADOCK 05000280 P
PDR S1Cl5/LT COLR Rev 0 CORE OPERATING LIMITS REPORT Surry 1 Cycle 15 Pattern LT Rev O March 1997 Page 1 of 6  


==1.0 INTRODUCTION==
==1.0 INTRODUCTION==
The Core Operating Limits Report (COLR) been prepared in accordance with the Specification 6.2.C.
for Surry 1 Cycle 15 has requirements of Technical The technical specifications (TS) affected by this report are:
TS 3.l.E.l & TS 5.3.A.6.b - Moderator Temperature-coefficient TS 3.12.A.2 & TS 3.12.A.3 - Control Bank Insertion Limits TS 3.12.B.1 & TS 3.12.B.2 -
Power Distribution Limits S1Cl5/LT COLR Rev 0 Page 2 of 6


                *
2.0 OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections.
* The Core Operating Limits Report (COLR) for Surry 1 Cycle 15 has been prepared in accordance with the requirements of Technical Specification 6.2.C.
These limits have been developed using the NRC-approved methodologies specified in TS 6.2.C.
The technical specifications (TS) affected by this report are:
2.1 Moderator T!3mPerature Coefficient (TS 3.1.E.l & TS 5.3.A.6.b) 2.1.1 The Moderator Temperature Coefficient (MTC) limits are:  
TS 3.l.E.l & TS 5.3.A.6.b - Moderator Temperature-coefficient TS 3.12.A.2 & TS 3.12.A.3 - Control Bank Insertion Limits TS 3.12.B.1 & TS 3.12.B.2 - Power Distribution Limits S1Cl5/LT COLR  Rev 0                                     Page 2 of 6
+6.0 pcm/°F at less than 50 percent of RATED POWER, or  
 
+6.0 pcm/°F at 50% of Rated Power and linearly decreasing to O pcm/°F at Rated Power 2.2 Control Bank Insertion Limits (TS 3.12.A.2) 2.2.1 The control rod banks shall be limited in physical insertion as shown in Figure 1.
2.0
2.3 Heat Flux Hot Channel Factor-FO(Z) (TS 3.12.B.1)
* OPERATING LIMITS
CFQ FQ(Z)  
* The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections.           These limits have been developed using the NRC-approved methodologies specified in TS 6.2.C.
~ -----
2.1 Moderator T!3mPerature Coefficient (TS 3.1.E.l & TS 5.3.A.6.b) 2.1.1   The Moderator Temperature Coefficient (MTC) limits are:
          +6.0 pcm/°F at less than 50 percent of RATED POWER, or
          +6.0 pcm/°F at 50% of Rated Power and linearly decreasing to O pcm/°F at Rated Power 2.2 Control Bank Insertion Limits (TS 3.12.A.2) 2.2.1   The control rod banks shall be limited in physical insertion as shown in Figure 1.
2.3 Heat Flux Hot Channel Factor-FO(Z)   (TS 3.12.B.1)
CFQ FQ(Z) ~ -----
* K(Z) FOR P > 0.5 p
* K(Z) FOR P > 0.5 p
CFQ FQ(Z) ~ -----
CFQ FQ(Z)  
* K(Z) for P ~ 0.5 0.5 S1Cl5/LT COLR   Rev 0                                       Page 3 of 6
~ -----
* K(Z) for P ~ 0.5 0.5 S1Cl5/LT COLR Rev 0 Page 3 of 6  


                      *THERMAL POWER
THERMAL POWER where:
* where:     P = --------------
P = --------------
RATED POWER 2.3.1 CFQ   = 2.32 2.3.2 K(Z)   is provided in Figure 2.
RATED POWER 2.3.1 CFQ = 2.32 2.3.2 K(Z) is provided in Figure 2.
2o4 Nuclear Enthalpy Rise Hot Channel Factor. F~CN) (TS 3.12.B.1)
2o4 Nuclear Enthalpy Rise Hot Channel Factor. F~CN)
FLllI(N) ~ CFDH * {1 + PFDH*(l - P)}
(TS 3.12.B.1) 2.4.1 2.4.2 FLllI(N)  
THERMAL POWER where:     P = -------------
~ CFDH * {1 + PFDH*(l - P)}
RATED POWER 2.4.1        CFDH = 1.56 for Surry Improved fuel (SIF) 2.4.2        PFDH = 0. 3 S1Cl5/LT COLR     Rev 0                                 Page 4 of 6
THERMAL POWER where:
P = -------------
RATED POWER CFDH = 1.56 for Surry Improved fuel (SIF)
PFDH = 0. 3 S1Cl5/LT COLR Rev 0 Page 4 of 6  


                      --  ---~-
---~-
e
e FIGURE 1 CONTROL BANK INSERTION LIMITS FULLY WITHDRAWN= 227 Steps z
* FIGURE 1 CONTROL BANK INSERTION LIMITS FULLY WITHDRAWN= 227 Steps 230
230 220 210 200 190 180 170 160 0
                                                          .475, 2l 7) 220                                       /
150  
                                                  /
.=
210                               /
en -
200
140 0
                                            /
C
190
: a. I 130
                                      /  C BanK 180
: a...  
                                  .v                                                  11.0. 18:3~
~ ~ 120  
                                                                                              ,;
~ ~ 110 5 g-100 ffi §_ 90 8
170           V
80 a:
                              /                                                        /
70 60 50 40 30 20 10 0
                      /                                                          /v 160 z
/
0      150 /                                                              /
/
    .=           (0, 151'
/
                                                                            /
/
en 0
/
        -C 140                                                          /
C BanK
a.
.. v
a.
/
I
V
        ..
/
130                                                      /
/
    ~   ~   120
(0, 151'
                                                                  /
/  
    ~   ~   110
/v V  
                                                            /    D Bark
/  
                                                        .,/
/  
5 g-   100 ffi §_   90                                     /
/  
                                              /v 8a:      80 70                          V 60
/  
                                    /
/  
                                      /
/(a, 23) 0 0.1 0.2 0.3 0.4  
                                /
.475, 2l 7) 11.0. 18:3~
50 40              /
/
30      /
/v
                /(a, 23) 20 10 0
/
0       0.1     0.2   0.3     0.4   0.5     0.6     0.7   0.8   0.9 FRACTION OF RATED THERMAL POWER S1Cl5/LT COLR Rev 0                                                               Page 5 of 6
/
/ /
/
/
D Bark
.,/
0.5 0.6 0.7 0.8 0.9 FRACTION OF RATED THERMAL POWER S1Cl5/LT COLR Rev 0 Page 5 of 6  


.
FIGURE 2 K(Z) - NORMALIZED FQ AS A FUNCTION OF CORE HEIGHT 1,2 1.1 1
* FIGURE 2 K(Z) - NORMALIZED FQ AS A FUNCTION OF CORE HEIGHT 1,2 1.1
0.9 0.8 s;
: 6. 1.0 1
0.9
                                                                -(12. 0.925' r---
0.8 s;
0 u.
0 u.
C 0.7 w
C 0.7 w
N
N
:::i
:::i < 0.6
    < 0.6
::e a:
::e a:
0 ZI 05
0 Z 05 I
    --
N -
N
~
    ~
            ,
0.4 0.3 0.2 0.1 0
0.4 0.3 0.2 0.1 0
0       2   3   4   5     6     7 8   9   10     11     12 CORE HEIGHT (FT)
0 2
S1Cl5/LT COLR Rev 0                                            Page 6 of 6}}
S1Cl5/LT COLR Rev 0
: 6. 1.0 (12. 0.925'
- r---
3 4
5 6
7 8
9 10 11 12 CORE HEIGHT (FT)
Page 6 of 6}}

Latest revision as of 19:27, 5 January 2025

Rev 0 of COLR Surry 1,Cycle 15 Pattern Lt
ML18153A526
Person / Time
Site: Surry Dominion icon.png
Issue date: 03/31/1997
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18153A525 List:
References
NUDOCS 9704300004
Download: ML18153A526 (6)


Text

9704300004 970424 PDR ADOCK 05000280 P

PDR S1Cl5/LT COLR Rev 0 CORE OPERATING LIMITS REPORT Surry 1 Cycle 15 Pattern LT Rev O March 1997 Page 1 of 6

1.0 INTRODUCTION

The Core Operating Limits Report (COLR) been prepared in accordance with the Specification 6.2.C.

for Surry 1 Cycle 15 has requirements of Technical The technical specifications (TS) affected by this report are:

TS 3.l.E.l & TS 5.3.A.6.b - Moderator Temperature-coefficient TS 3.12.A.2 & TS 3.12.A.3 - Control Bank Insertion Limits TS 3.12.B.1 & TS 3.12.B.2 -

Power Distribution Limits S1Cl5/LT COLR Rev 0 Page 2 of 6

2.0 OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections.

These limits have been developed using the NRC-approved methodologies specified in TS 6.2.C.

2.1 Moderator T!3mPerature Coefficient (TS 3.1.E.l & TS 5.3.A.6.b) 2.1.1 The Moderator Temperature Coefficient (MTC) limits are:

+6.0 pcm/°F at less than 50 percent of RATED POWER, or

+6.0 pcm/°F at 50% of Rated Power and linearly decreasing to O pcm/°F at Rated Power 2.2 Control Bank Insertion Limits (TS 3.12.A.2) 2.2.1 The control rod banks shall be limited in physical insertion as shown in Figure 1.

2.3 Heat Flux Hot Channel Factor-FO(Z) (TS 3.12.B.1)

CFQ FQ(Z)

~ -----

  • K(Z) FOR P > 0.5 p

CFQ FQ(Z)

~ -----

  • K(Z) for P ~ 0.5 0.5 S1Cl5/LT COLR Rev 0 Page 3 of 6

THERMAL POWER where:

P = --------------

RATED POWER 2.3.1 CFQ = 2.32 2.3.2 K(Z) is provided in Figure 2.

2o4 Nuclear Enthalpy Rise Hot Channel Factor. F~CN)

(TS 3.12.B.1) 2.4.1 2.4.2 FLllI(N)

~ CFDH * {1 + PFDH*(l - P)}

THERMAL POWER where:

P = -------------

RATED POWER CFDH = 1.56 for Surry Improved fuel (SIF)

PFDH = 0. 3 S1Cl5/LT COLR Rev 0 Page 4 of 6

---~-

e FIGURE 1 CONTROL BANK INSERTION LIMITS FULLY WITHDRAWN= 227 Steps z

230 220 210 200 190 180 170 160 0

150

.=

en -

140 0

C

a. I 130
a...

~ ~ 120

~ ~ 110 5 g-100 ffi §_ 90 8

80 a:

70 60 50 40 30 20 10 0

/

/

/

/

/

C BanK

.. v

/

V

/

/

(0, 151'

/

/v V

/

/

/

/

/

/(a, 23) 0 0.1 0.2 0.3 0.4

.475, 2l 7) 11.0. 18:3~

/

/v

/

/

/ /

/

/

D Bark

.,/

0.5 0.6 0.7 0.8 0.9 FRACTION OF RATED THERMAL POWER S1Cl5/LT COLR Rev 0 Page 5 of 6

FIGURE 2 K(Z) - NORMALIZED FQ AS A FUNCTION OF CORE HEIGHT 1,2 1.1 1

0.9 0.8 s;

0 u.

C 0.7 w

N

i < 0.6
e a:

0 Z 05 I

N -

~

0.4 0.3 0.2 0.1 0

0 2

S1Cl5/LT COLR Rev 0

6. 1.0 (12. 0.925'

- r---

3 4

5 6

7 8

9 10 11 12 CORE HEIGHT (FT)

Page 6 of 6