PDR S1Cl5/LT COLR Rev 0 CORE OPERATING LIMITS REPORT Surry 1 Cycle 15 Pattern LT Rev O March 1997 Page 1 of 6
1.0 INTRODUCTION
The Core Operating Limits Report (COLR) been prepared in accordance with the Specification 6.2.C.
for Surry 1 Cycle 15 has requirements of Technical The technical specifications (TS) affected by this report are:
TS 3.l.E.l & TS 5.3.A.6.b - Moderator Temperature-coefficient TS 3.12.A.2 & TS 3.12.A.3 - Control Bank Insertion Limits TS 3.12.B.1 & TS 3.12.B.2 -
Power Distribution Limits S1Cl5/LT COLR Rev 0 Page 2 of 6
2.0 OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections.
These limits have been developed using the NRC-approved methodologies specified in TS 6.2.C.
2.1 Moderator T!3mPerature Coefficient (TS 3.1.E.l & TS 5.3.A.6.b) 2.1.1 The Moderator Temperature Coefficient (MTC) limits are:
+6.0 pcm/°F at less than 50 percent of RATED POWER, or
+6.0 pcm/°F at 50% of Rated Power and linearly decreasing to O pcm/°F at Rated Power 2.2 Control Bank Insertion Limits (TS 3.12.A.2) 2.2.1 The control rod banks shall be limited in physical insertion as shown in Figure 1.
2.3 Heat Flux Hot Channel Factor-FO(Z) (TS 3.12.B.1)
CFQ FQ(Z)
~ -----
- K(Z) FOR P > 0.5 p
CFQ FQ(Z)
~ -----
- K(Z) for P ~ 0.5 0.5 S1Cl5/LT COLR Rev 0 Page 3 of 6
THERMAL POWER where:
P = --------------
RATED POWER 2.3.1 CFQ = 2.32 2.3.2 K(Z) is provided in Figure 2.
2o4 Nuclear Enthalpy Rise Hot Channel Factor. F~CN)
(TS 3.12.B.1) 2.4.1 2.4.2 FLllI(N)
~ CFDH * {1 + PFDH*(l - P)}
THERMAL POWER where:
P = -------------
RATED POWER CFDH = 1.56 for Surry Improved fuel (SIF)
PFDH = 0. 3 S1Cl5/LT COLR Rev 0 Page 4 of 6
---~-
e FIGURE 1 CONTROL BANK INSERTION LIMITS FULLY WITHDRAWN= 227 Steps z
230 220 210 200 190 180 170 160 0
150
.=
en -
140 0
C
- a. I 130
- a...
~ ~ 120
~ ~ 110 5 g-100 ffi §_ 90 8
80 a:
70 60 50 40 30 20 10 0
/
/
/
/
/
C BanK
.. v
/
V
/
/
(0, 151'
/
/v V
/
/
/
/
/
/(a, 23) 0 0.1 0.2 0.3 0.4
.475, 2l 7) 11.0. 18:3~
/
/v
/
/
/ /
/
/
D Bark
.,/
0.5 0.6 0.7 0.8 0.9 FRACTION OF RATED THERMAL POWER S1Cl5/LT COLR Rev 0 Page 5 of 6
FIGURE 2 K(Z) - NORMALIZED FQ AS A FUNCTION OF CORE HEIGHT 1,2 1.1 1
0.9 0.8 s;
0 u.
C 0.7 w
N
- i < 0.6
- e a:
0 Z 05 I
N -
~
0.4 0.3 0.2 0.1 0
0 2
S1Cl5/LT COLR Rev 0
- 6. 1.0 (12. 0.925'
- r---
3 4
5 6
7 8
9 10 11 12 CORE HEIGHT (FT)
Page 6 of 6