{{#Wiki_filter:August 31, 2016
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.


KING OF PRUSSIA, PA 19406-2713 August 31, 2016 Mr. Bryan Hanson Senior Vice President, Exelon Generation, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.
==SUBJECT:==
MID-CYCLE ASSESSMENT LETTER FOR THREE MILE ISLAND


Warrenville, IL 60555
NUCLEAR STATION, UNIT 1 (REPORT 05000289/2016005)
 
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (REPORT 05000289/2016005)


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Three Mile Island Nuclear Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 201 5 , through June 30, 201 6. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Three Mile Island Nuclear Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.


The NRC determined that overall, Three Mile Island Nuclear Station, Unit 1 , operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Three Mile Island Nuclear Station, Unit 1, during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 201 8. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last half of the inspection period in the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," and Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 2515-191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans."
The NRC determined that overall, Three Mile Island Nuclear Station, Unit 1, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Three Mile Island Nuclear Station, Unit 1, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.


In Staff Requirements Memorandum
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last half of the inspection period in the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 2515-191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.
- SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities,"
(ADAMS Accession # ML16104A158)
the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct assessment reviews and communicate changes in the assessment of licensee performance quarterly, and will also issue


end-of-cycle assessment letters.
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, (ADAMS Accession #
ML16104A158) the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct assessment reviews and communicate changes in the assessment of licensee performance quarterly, and will also issue end-of-cycle assessment letters.


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC's Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Please contact me at (610) 337-5046 with any questions you have regarding this letter.
Please contact me at (610) 337-5046 with any questions you have regarding this letter.


Sincerely,
Sincerely,
/RA/
/RA/  
Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects
 
Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects  
 
Docket No. 50-289 License No. DPR-50
 
Enclosure:
Inspection Plan
 
ML162135A334 SUNSI Review
 
Non-Sensitive
 
Sensitive
 
Publicly Available
 
Non-Publicly Available
 
OFFICE RI/DRP RI/DRP RI/DRP
 
NAME AZiedonis/AZ SShaffer/SS SKennedy/SK
 
DATE 08/29/2016 08/17/2016 08/29/2016 Letter to Mr. Bryan Hanson from Silas R. Kennedy dated August 31, 2016.
 
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THREE MILE ISLAND
 
NUCLEAR STATION, UNIT 1 (REPORT 05000289/2016005)
 
DISTRIBUTION w/encl: (via e-mail)
DDorman, ORA DLew, DRA MScott, DRP DPelton, DRP RLorson, DRS SKennedy, DRP SShaffer, DRP SElkhiamy, DRP MHenrion, DRP AZiedonis, DRP, SRI (Acting SRI ends 9/3)
BLin, DRP, RI ADiaz, DRP, AA JBowen, RI, OEDO RidsNrrPMThreeMileIsland Resource RidsNrrDorlLpl1-2 Resource ROPReports Resource RMcKinley, DRS JNoggle, DRS MGray, DRS PKrohn, DRS CCahill, DRS DJackson, DRS NMcNamara, RI, SLO DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource
 
Page 1 of 2 08/29/2016 13:39:14 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Three Mile Island Inspection / Activity Plan 07/01/2016 - 06/30/2018 711110T
- TRIENNIAL HEAT SINK
 
1 IP Heat Sink Performance 7111107T 07/18/2016 07/22/2016 71124
- RAD SAFETY INSPECTION
 
1 IP Radiation Monitoring Instrumentation 71124.05 08/08/2016 08/12/2016 71124
- RAD SAFETY INSPECTION
 
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/14/2016 11/18/2016
 
IP Occupational ALARA Planning and Controls 71124.02 11/14/2016 11/18/2016
 
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/14/2016 11/18/2016
 
IP Occupational Dose Assessment 71124.04 11/14/2016 11/18/2016
 
IP Occupational Exposure Control Effectiveness 71151-OR01 11/14/2016 11/18/2016 6/26EXAM
- TMI INITIAL OL EXAM
 
1 FY17-TMI INITIAL OPERATOR LICENSING EXAM U01944 05/29/2017 06/02/2017
 
FY17-TMI INITIAL OPERATOR LICENSING EXAM U01944 06/26/2017 07/07/2017 7111105T
- TRIENNIAL FIRE PROTECTION
 
1 IP Fire Protection [Triennial]
7111105T 01/23/2017 01/27/2017
 
IP Fire Protection [Triennial]
7111105T 02/06/2017 02/10/2017 7111111B
- TMI REQUAL INSP WITH P/F RESULTS
 
1 IP Licensed Operator Requalification Program 7111111B 03/13/2017 03/17/2017 EP
- EP EXERCISE EVALUATION
 
1 IP Exercise Evaluation 7111401 04/10/2017 04/14/2017
 
IP Performance Indicator Verification 71151 04/10/2017 04/14/2017 71124
- HP INSPECTION
 
1 IP Occupational ALARA Planning and Controls 71124.02 05/08/2017 05/12/2017
 
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/08/2017 05/12/2017
 
IP Occupational Dose Assessment 71124.04 05/08/2017 05/12/2017
 
IP Radiation Monitoring Instrumentation 71124.05 05/08/2017 05/12/2017 71124
- REMP
 
1 IP Radiological Environmental Monitoring Program 71124.07 07/24/2017 07/28/2017
 
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 07/24/2017 07/28/2017 71124.08
- RADWASTE
 
1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 09/11/2017 09/15/2017 71124
- HP INSPECTION
 
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/25/2017 09/29/2017 This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
Page 2 of 2 08/29/2016 13:39:14 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Three Mile Island Inspection / Activity Plan 07/01/2016 - 06/30/2018 71124
- HP INSPECTION
 
1 IP Occupational ALARA Planning and Controls 71124.02 09/25/2017 09/29/2017
 
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/25/2017 09/29/2017
 
IP Occupational Dose Assessment 71124.04 09/25/2017 09/29/2017 7111108P
- INSERVICE INSPECTION
 
1 IP Inservice Inspection Activities - PWR 7111108P 09/25/2017 10/06/2017 71124
- HP INSPECTION
 
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/13/2017 11/17/2017
 
IP Occupational ALARA Planning and Controls 71124.02 11/13/2017 11/17/2017
 
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/13/2017 11/17/2017
 
IP Occupational Dose Assessment 71124.04 11/13/2017 11/17/2017
 
IP Occupational Exposure Control Effectiveness 71151-OR01 11/13/2017 11/17/2017 EP
- EP PROGRAM INSPECTION
 
1 IP Alert and Notification System Testing 7111402 03/05/2018 03/09/2018
 
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 03/05/2018 03/09/2018
 
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/05/2018 03/09/2018
 
IP Performance Indicator Verification 71151 03/05/2018 03/09/2018 71124
- RAD SAFETY INSP


Docket No.
1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 02/12/2018 02/16/2018


50-289 License No.
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 02/12/2018 02/16/2018 7111121
- CDBI


DPR-50 Enclosure:
1 IP Component Design Bases Inspection 7111121 02/26/2018 03/02/2018
Inspection Plan


ML162135A334 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME AZiedonis/AZ SShaffer/SS SKennedy/SK DATE 08/29/2016 08/17/2016 08/29/2016 Letter to Mr. Bry an Hanson from Silas R. Kennedy dated August 31, 2016.
IP Component Design Bases Inspection 7111121 03/12/2018 03/16/2018


SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (REPORT 05000289/2016005)
IP Component Design Bases Inspection 7111121 03/26/2018 03/30/2018 71152B
DISTRIBUTION w/encl: (via e-mail) DDorman, ORA DLew, DRA MScott, DRP DPelton, DRP RLorson, DRS SKennedy, DRP SShaffer, DRP SElkhiamy, DRP MHenrion, DRP AZiedonis, DRP, SRI (Acting SRI ends 9/3)
- PI&R BIENNIAL
BLin, DRP, RI ADiaz, DRP, AA JBowen, RI, OEDO


RidsNrrPMThreeMileIsland Resource RidsNrrDorlLpl1-2 Resource ROPReports Resource RMcKinley, DRS JNoggle, DRS MGray, DRS PKrohn, DRS CCahill, DRS DJackson, DRS NMcNamara, RI, SLO DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource
1 IP Problem Identification and Resolution 71152B 04/30/2018 05/04/2018


Page 1 of 2 08/29/2016 13:39:14 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Three Mile IslandInspection / Activity Plan 07/01/2016-06/30/2018711110T-TRIENNIAL HEAT SINK 1 1 IP Heat Sink Performance7111107T 07/18/2016 07/22/201671124-RAD SAFETY INSPECTION 1 1 IP Radiation Monitoring Instrumentation71124.05 08/08/2016 08/12/201671124-RAD SAFETY INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.0111/14/201611/18/2016 1 IP Occupational ALARA Planning and Controls71124.0211/14/201611/18/2016 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0311/14/201611/18/2016 1 IP Occupational Dose Assessment71124.0411/14/201611/18/2016 1 IP Occupational Exposure Control Effectiveness71151-OR0111/14/201611/18/20166/26EXAM-TMI INITIAL OL EXAM 4 1 FY17-TMI INITIAL OPERATOR LICENSING EXAM U01944 05/29/2017 06/02/2017 1 FY17-TMI INITIAL OPERATOR LICENSING EXAM U01944 06/26/2017 07/07/20177111105T-TRIENNIAL FIRE PROTECTION 4 1 IP Fire Protection [Triennial]7111105T 01/23/2017 01/27/2017 1 IP Fire Protection [Triennial]7111105T 02/06/2017 02/10/20177111111B-TMI REQUAL INSP WITH P/F RESULTS 2 1 IP Licensed Operator Requalification Program7111111B 03/13/2017 03/17/2017 EP-EP EXERCISE EVALUATION 4 1 IP Exercise Evaluation7111401 04/10/2017 04/14/2017 1 IP Performance Indicator Verification71151 04/10/2017 04/14/201771124-HP INSPECTION 1 1 IP Occupational ALARA Planning and Controls71124.02 05/08/2017 05/12/2017 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 05/08/2017 05/12/2017 1 IP Occupational Dose Assessment71124.04 05/08/2017 05/12/2017 1 IP Radiation Monitoring Instrumentation71124.05 05/08/2017 05/12/201771124-REMP 1 1 IP Radiological Environmental Monitoring Program71124.07 07/24/2017 07/28/2017 1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 07/24/2017 07/28/201771124.08-RADWASTE 1 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0809/11/2017 09/15/201771124-HP INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/25/2017 09/29/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
IP Problem Identification and Resolution 71152B 05/14/2018 05/18/2018 This report does not include INPO and OUTAGE activities.


Page 2 of 2 08/29/2016 13:39:14 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Three Mile IslandInspection / Activity Plan 07/01/2016-06/30/201871124-HP INSPECTION 1 1 IP Occupational ALARA Planning and Controls71124.02 09/25/2017 09/29/2017 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 09/25/2017 09/29/2017 1 IP Occupational Dose Assessment71124.04 09/25/2017 09/29/20177111108P-INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 09/25/2017 10/06/201771124-HP INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.0111/13/201711/17/2017 1 IP Occupational ALARA Planning and Controls71124.0211/13/201711/17/2017 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0311/13/201711/17/2017 1 IP Occupational Dose Assessment71124.0411/13/201711/17/2017 1 IP Occupational Exposure Control Effectiveness71151-OR0111/13/201711/17/2017 EP-EP PROGRAM INSPECTION 1 1 IP A lert and Notification System Testing7111402 03/05/2018 03/09/2018 1 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 03/05/2018 03/09/2018 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 03/05/2018 03/09/2018 1 IP Performance Indicator Verification71151 03/05/2018 03/09/201871124-RAD SAFETY INSP 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 02/12/2018 02/16/2018 1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 02/12/2018 02/16/20187111121-CDBI 6 1 IP Component Design Bases Inspection7111121 02/26/2018 03/02/2018 1 IP Component Design Bases Inspection7111121 03/12/2018 03/16/2018 1 IP Component Design Bases Inspection7111121 03/26/2018 03/30/201871152B-PI&R BIENNIAL 1 1 IP Problem Identification and Resolution71152B 04/30/2018 05/04/2018 1 IP Problem Identification and Resolution71152B 05/14/2018 05/18/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 20:49, 9 January 2025

Mid-Cycle Assessment Letter for Three Mile Island Nuclear Station, Unit 1 (Report 05000289/2016005)
ML16235A334
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/31/2016
From: Silas Kennedy
NRC/RGN-I/DRP/PB6
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Kennedy S
References
IR 2016005
Download: ML16235A334 (6)


Text

August 31, 2016

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR THREE MILE ISLAND

NUCLEAR STATION, UNIT 1 (REPORT 05000289/2016005)

Dear Mr. Hanson:

On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Three Mile Island Nuclear Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Three Mile Island Nuclear Station, Unit 1, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Three Mile Island Nuclear Station, Unit 1, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last half of the inspection period in the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 2515-191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, (ADAMS Accession #

ML16104A158) the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct assessment reviews and communicate changes in the assessment of licensee performance quarterly, and will also issue end-of-cycle assessment letters.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-5046 with any questions you have regarding this letter.

Sincerely,

/RA/

Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects

Docket No. 50-289 License No. DPR-50

Enclosure:

Inspection Plan

ML162135A334 SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE RI/DRP RI/DRP RI/DRP

NAME AZiedonis/AZ SShaffer/SS SKennedy/SK

DATE 08/29/2016 08/17/2016 08/29/2016 Letter to Mr. Bryan Hanson from Silas R. Kennedy dated August 31, 2016.

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THREE MILE ISLAND

NUCLEAR STATION, UNIT 1 (REPORT 05000289/2016005)

DISTRIBUTION w/encl: (via e-mail)

DDorman, ORA DLew, DRA MScott, DRP DPelton, DRP RLorson, DRS SKennedy, DRP SShaffer, DRP SElkhiamy, DRP MHenrion, DRP AZiedonis, DRP, SRI (Acting SRI ends 9/3)

BLin, DRP, RI ADiaz, DRP, AA JBowen, RI, OEDO RidsNrrPMThreeMileIsland Resource RidsNrrDorlLpl1-2 Resource ROPReports Resource RMcKinley, DRS JNoggle, DRS MGray, DRS PKrohn, DRS CCahill, DRS DJackson, DRS NMcNamara, RI, SLO DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource

Page 1 of 2 08/29/2016 13:39:14 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Three Mile Island Inspection / Activity Plan 07/01/2016 - 06/30/2018 711110T

- TRIENNIAL HEAT SINK

1 IP Heat Sink Performance 7111107T 07/18/2016 07/22/2016 71124

- RAD SAFETY INSPECTION

1 IP Radiation Monitoring Instrumentation 71124.05 08/08/2016 08/12/2016 71124

- RAD SAFETY INSPECTION

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/14/2016 11/18/2016

IP Occupational ALARA Planning and Controls 71124.02 11/14/2016 11/18/2016

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/14/2016 11/18/2016

IP Occupational Dose Assessment 71124.04 11/14/2016 11/18/2016

IP Occupational Exposure Control Effectiveness 71151-OR01 11/14/2016 11/18/2016 6/26EXAM

- TMI INITIAL OL EXAM

1 FY17-TMI INITIAL OPERATOR LICENSING EXAM U01944 05/29/2017 06/02/2017

FY17-TMI INITIAL OPERATOR LICENSING EXAM U01944 06/26/2017 07/07/2017 7111105T

- TRIENNIAL FIRE PROTECTION

1 IP Fire Protection [Triennial]

7111105T 01/23/2017 01/27/2017

IP Fire Protection [Triennial]

7111105T 02/06/2017 02/10/2017 7111111B

- TMI REQUAL INSP WITH P/F RESULTS

1 IP Licensed Operator Requalification Program 7111111B 03/13/2017 03/17/2017 EP

- EP EXERCISE EVALUATION

1 IP Exercise Evaluation 7111401 04/10/2017 04/14/2017

IP Performance Indicator Verification 71151 04/10/2017 04/14/2017 71124

- HP INSPECTION

1 IP Occupational ALARA Planning and Controls 71124.02 05/08/2017 05/12/2017

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/08/2017 05/12/2017

IP Occupational Dose Assessment 71124.04 05/08/2017 05/12/2017

IP Radiation Monitoring Instrumentation 71124.05 05/08/2017 05/12/2017 71124

- REMP

1 IP Radiological Environmental Monitoring Program 71124.07 07/24/2017 07/28/2017

IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 07/24/2017 07/28/2017 71124.08

- RADWASTE

1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 09/11/2017 09/15/2017 71124

- HP INSPECTION

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/25/2017 09/29/2017 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 08/29/2016 13:39:14 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Three Mile Island Inspection / Activity Plan 07/01/2016 - 06/30/2018 71124

- HP INSPECTION

1 IP Occupational ALARA Planning and Controls 71124.02 09/25/2017 09/29/2017

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/25/2017 09/29/2017

IP Occupational Dose Assessment 71124.04 09/25/2017 09/29/2017 7111108P

- INSERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 09/25/2017 10/06/2017 71124

- HP INSPECTION

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/13/2017 11/17/2017

IP Occupational ALARA Planning and Controls 71124.02 11/13/2017 11/17/2017

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/13/2017 11/17/2017

IP Occupational Dose Assessment 71124.04 11/13/2017 11/17/2017

IP Occupational Exposure Control Effectiveness 71151-OR01 11/13/2017 11/17/2017 EP

- EP PROGRAM INSPECTION

1 IP Alert and Notification System Testing 7111402 03/05/2018 03/09/2018

IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 03/05/2018 03/09/2018

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/05/2018 03/09/2018

IP Performance Indicator Verification 71151 03/05/2018 03/09/2018 71124

- RAD SAFETY INSP

1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 02/12/2018 02/16/2018

IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 02/12/2018 02/16/2018 7111121

- CDBI

1 IP Component Design Bases Inspection 7111121 02/26/2018 03/02/2018

IP Component Design Bases Inspection 7111121 03/12/2018 03/16/2018

IP Component Design Bases Inspection 7111121 03/26/2018 03/30/2018 71152B

- PI&R BIENNIAL

1 IP Problem Identification and Resolution 71152B 04/30/2018 05/04/2018

IP Problem Identification and Resolution 71152B 05/14/2018 05/18/2018 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.