ML063120509: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML063120509 | | number = ML063120509 | ||
| issue date = 11/09/2006 | | issue date = 11/09/2006 | ||
| title = Summary of November 6, 2006, Category 1 Working-Level Meeting with PPL to Discuss the | | title = Summary of November 6, 2006, Category 1 Working-Level Meeting with PPL to Discuss the Licensees Extended Power Uprate (EPU) Submittal Dated October 11, 2006 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML06290016 | ||
| author name = Guzman R | | author name = Guzman R | ||
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-1 | | author affiliation = NRC/NRR/ADRO/DORL/LPLI-1 | ||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:November 9, | {{#Wiki_filter:November 9, 2006 LICENSEE: | ||
PPL Susquehanna, LLC (PPL) | |||
FACILITY: | |||
Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF NOVEMBER 6, 2006, CATEGORY 1 WORKING- | OF NOVEMBER 6, 2006, CATEGORY 1 WORKING-LEVEL MEETING WITH PPL TO DISCUSS THE LICENSEES EXTENDED POWER UPRATE (EPU) SUBMITTAL DATED OCTOBER 11, 2006 (AGENCYWIDE DOCUMENTS ACCESS AND MANAGEMENT SYSTEM (ADAMS) ACCESSION NO. ML062900160) | ||
A list of meeting attendees is provided as Enclosure 1. Also provided is a copy of the | On November 6, 2006, a public meeting was held between the Nuclear Regulatory Commission (NRC), and representatives of PPL, the licensee for SSES 1 and 2, and its contractors, General Electric Company, Continuum Dynamics, Incorporated, and MPR Associates at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to conduct a working-level discussion of PPLs October 11, 2006, EPU license amendment application for SSES 1 and 2 related to steam dryer analysis and testing. | ||
A list of meeting attendees is provided as Enclosure 1. Also provided is a copy of the licensees slides (Enclosure 2) presented at the meeting. | |||
PPL presented an overview of the major changes in their revised EPU application and also provided a description of their steam dryer and main steam line configurations with the various evaluations and testing methods for analyzing the steam dryers at SSES 1 and 2. PPL also discussed its steam dryer structural evaluation process, uncertainty conditions, and its finite element analysis results. | |||
PPL concluded and summarized its presentation by stating that (1) their analysis shows that no acoustic resonances are expected to exist at full EPU conditions, (2) steam line testing demonstrates that no acoustic resonances will exist at the first EPU step and that the main steam lines and attached equipment will be subject to low levels of vibration at the first EPU step, (3) analysis techniques are comprehensive and utilize actual Susquehanna plant data, (4) the steam dryer analysis method was benchmarked against measured Susquehanna strains, and (5) that the EPU steam dryer design will conform to the American Society of Mechanical Engineers design criteria ensuring the steam dryer will maintain its structural integrity. | |||
Before the meeting adjourned, the public was given the opportunity to communicate with the NRC staff. One member of the public was in attendance, representing McGraw-Hill Company, and requested the status of the NRC staffs acceptance review of the licensees EPU application. The NRC staff informed the member of the public that the acceptance review was in progress and would be completed shortly. The member of the public also inquired whether there would be any impacts in the NRCs review schedule when reviewing both PPL applications for license renewal and EPU. The NRC staff informed the member of the public that the review schedule for license renewal is described in a {{letter dated|date=August 2, 2006|text=letter dated August 2, 2006}} (Agencywide Documents Access and Management System (ADAMS) accession no. | |||
ML062140549). The letter documenting the acceptance review results for PPLs license renewal application was issued to PPL on October 26, 2006 (ML062930293). The member of the public chose not to complete any Public Meeting Feedback Forms (NRC Form 659) which were available at the meeting. | |||
Please direct any inquiries to me at 301-415-1030, or rvg@nrc.gov. | |||
/RA/ | |||
Richard V. Guzman, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388 | |||
==Enclosures:== | ==Enclosures:== | ||
: 1. List of Attendees | : 1. List of Attendees | ||
: 2. | : 2. Licensees Handouts/Slides cc w/encls: See next page | ||
ML063120509 OFFICE LPLI-1/PM LPLI-1/LA LPLI-1/BC NAME RGuzman SLittle RLaufer DATE 11/09/06 11/09/06 11/09/06 | |||
LIST OF ATTENDEES REVIEW MEETING WITH PPL SUSQUEHANNA, LLC REGARDING EXTENDED POWER UPRATE PROPOSED LICENSE AMENDMENT NOVEMBER 6, 2006 - 10:00-12:30, O-8-B-4 NAME ORGANIZATION | |||
: 1. Richard V. Guzman NRC | |||
: 2. Richard J. Laufer NRC | |||
: 3. Thomas Scarbrough NRC | |||
: 4. Kamal Manoly NRC | |||
: 5. John Lubinski NRC | |||
: 6. Kevin Browning PPL Susquehanna | |||
: 7. John A. Bartos PPL Susquehanna | |||
: 8. George T. Jones PPL Susquehanna | |||
: 9. Michael S. Gorski PPL Susquehanna | |||
: 10. Patricia L. Campbell General Electric | |||
: 11. Dan Pappone General Electric | |||
: 12. Bill McCurdy MPR Associates | |||
: 13. Edward Bird MPR Associates | |||
: 14. Alan Bilanin Continuum Dynamics Inc. | |||
: 15. Ching Hang Ng NRC | |||
: 16. Tom Alexion NRC | |||
: 17. Andy DuBouchet NRC | |||
: 18. Paul Duke PSEG Nuclear | |||
: 19. Daniel Horner McGraw-Hill Company | |||
: 20. George Inch Constellation Energy Group | |||
: 21. Gary S. Pavis Constellation Energy Group | |||
: 22. Michael Crowthers PPL Susquehanna | |||
: 23. John Wu NRC | |||
: 24. Vic Shah (by teleconference) | |||
NRC Contractor | |||
: 25. Tom Mulcahy (by teleconference) | |||
NRC Contractor | |||
: 26. Steve Hambric (by teleconference) | |||
NRC Contractor | |||
: 27. Samir Ziada (by teleconference) | |||
NRC Contractor | |||
MEETING SLIDES | |||
475 Allendale Road King of Prussia, PA | Susquehanna Steam Electric Station, Units 1 and 2 cc: | ||
Mr. Britt T. McKinney Sr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467 Robert A. Saccone General Manager - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467 Terry L. Harpster General Manager - Plant Support PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Rocco R. Sgarro Manager - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Walter E. Morrissey Supervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Michael H. Crowthers Supervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Steven M. Cook Manager - Quality Assurance PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Luis A. Ramos Community Relations Manager, Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA 18603-0467 Bryan A. Snapp, Esq Assoc. General Counsel PPL Services Corporation Two North Ninth Street, GENTW3 Allentown, PA 18101-1179 Supervisor - Document Control Services PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Richard W. Osborne Allegheny Electric Cooperative, Inc. | |||
212 Locust Street P.O. Box 1266 Harrisburg, PA 17108-1266 Director - Bureau of Radiation Protection Pennsylvania Department of Environmental Protection P.O. Box 8469 Harrisburg, PA 17105-8469 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4 Berwick, PA 18603-0035 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603-0035 Dr. Judith Johnsrud National Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803}} | |||
Latest revision as of 05:10, 15 January 2025
| ML063120509 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 11/09/2006 |
| From: | Richard Guzman NRC/NRR/ADRO/DORL/LPLI-1 |
| To: | Mckinney B Susquehanna |
| Guzman R, NRR/DORL, 415-1030 | |
| References | |
| Download: ML063120509 (7) | |
Text
November 9, 2006 LICENSEE:
FACILITY:
Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2)
SUBJECT:
SUMMARY
OF NOVEMBER 6, 2006, CATEGORY 1 WORKING-LEVEL MEETING WITH PPL TO DISCUSS THE LICENSEES EXTENDED POWER UPRATE (EPU) SUBMITTAL DATED OCTOBER 11, 2006 (AGENCYWIDE DOCUMENTS ACCESS AND MANAGEMENT SYSTEM (ADAMS) ACCESSION NO. ML062900160)
On November 6, 2006, a public meeting was held between the Nuclear Regulatory Commission (NRC), and representatives of PPL, the licensee for SSES 1 and 2, and its contractors, General Electric Company, Continuum Dynamics, Incorporated, and MPR Associates at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to conduct a working-level discussion of PPLs October 11, 2006, EPU license amendment application for SSES 1 and 2 related to steam dryer analysis and testing.
A list of meeting attendees is provided as Enclosure 1. Also provided is a copy of the licensees slides (Enclosure 2) presented at the meeting.
PPL presented an overview of the major changes in their revised EPU application and also provided a description of their steam dryer and main steam line configurations with the various evaluations and testing methods for analyzing the steam dryers at SSES 1 and 2. PPL also discussed its steam dryer structural evaluation process, uncertainty conditions, and its finite element analysis results.
PPL concluded and summarized its presentation by stating that (1) their analysis shows that no acoustic resonances are expected to exist at full EPU conditions, (2) steam line testing demonstrates that no acoustic resonances will exist at the first EPU step and that the main steam lines and attached equipment will be subject to low levels of vibration at the first EPU step, (3) analysis techniques are comprehensive and utilize actual Susquehanna plant data, (4) the steam dryer analysis method was benchmarked against measured Susquehanna strains, and (5) that the EPU steam dryer design will conform to the American Society of Mechanical Engineers design criteria ensuring the steam dryer will maintain its structural integrity.
Before the meeting adjourned, the public was given the opportunity to communicate with the NRC staff. One member of the public was in attendance, representing McGraw-Hill Company, and requested the status of the NRC staffs acceptance review of the licensees EPU application. The NRC staff informed the member of the public that the acceptance review was in progress and would be completed shortly. The member of the public also inquired whether there would be any impacts in the NRCs review schedule when reviewing both PPL applications for license renewal and EPU. The NRC staff informed the member of the public that the review schedule for license renewal is described in a letter dated August 2, 2006 (Agencywide Documents Access and Management System (ADAMS) accession no.
ML062140549). The letter documenting the acceptance review results for PPLs license renewal application was issued to PPL on October 26, 2006 (ML062930293). The member of the public chose not to complete any Public Meeting Feedback Forms (NRC Form 659) which were available at the meeting.
Please direct any inquiries to me at 301-415-1030, or rvg@nrc.gov.
/RA/
Richard V. Guzman, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388
Enclosures:
- 1. List of Attendees
- 2. Licensees Handouts/Slides cc w/encls: See next page
ML063120509 OFFICE LPLI-1/PM LPLI-1/LA LPLI-1/BC NAME RGuzman SLittle RLaufer DATE 11/09/06 11/09/06 11/09/06
LIST OF ATTENDEES REVIEW MEETING WITH PPL SUSQUEHANNA, LLC REGARDING EXTENDED POWER UPRATE PROPOSED LICENSE AMENDMENT NOVEMBER 6, 2006 - 10:00-12:30, O-8-B-4 NAME ORGANIZATION
- 1. Richard V. Guzman NRC
- 2. Richard J. Laufer NRC
- 3. Thomas Scarbrough NRC
- 4. Kamal Manoly NRC
- 5. John Lubinski NRC
- 6. Kevin Browning PPL Susquehanna
- 7. John A. Bartos PPL Susquehanna
- 8. George T. Jones PPL Susquehanna
- 9. Michael S. Gorski PPL Susquehanna
- 10. Patricia L. Campbell General Electric
- 11. Dan Pappone General Electric
- 12. Bill McCurdy MPR Associates
- 13. Edward Bird MPR Associates
- 14. Alan Bilanin Continuum Dynamics Inc.
- 15. Ching Hang Ng NRC
- 16. Tom Alexion NRC
- 17. Andy DuBouchet NRC
- 18. Paul Duke PSEG Nuclear
- 19. Daniel Horner McGraw-Hill Company
- 20. George Inch Constellation Energy Group
- 21. Gary S. Pavis Constellation Energy Group
- 22. Michael Crowthers PPL Susquehanna
- 23. John Wu NRC
- 24. Vic Shah (by teleconference)
NRC Contractor
- 25. Tom Mulcahy (by teleconference)
NRC Contractor
- 26. Steve Hambric (by teleconference)
NRC Contractor
- 27. Samir Ziada (by teleconference)
NRC Contractor
MEETING SLIDES
Susquehanna Steam Electric Station, Units 1 and 2 cc:
Mr. Britt T. McKinney Sr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467 Robert A. Saccone General Manager - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467 Terry L. Harpster General Manager - Plant Support PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Rocco R. Sgarro Manager - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Walter E. Morrissey Supervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Michael H. Crowthers Supervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Steven M. Cook Manager - Quality Assurance PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Luis A. Ramos Community Relations Manager, Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA 18603-0467 Bryan A. Snapp, Esq Assoc. General Counsel PPL Services Corporation Two North Ninth Street, GENTW3 Allentown, PA 18101-1179 Supervisor - Document Control Services PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Richard W. Osborne Allegheny Electric Cooperative, Inc.
212 Locust Street P.O. Box 1266 Harrisburg, PA 17108-1266 Director - Bureau of Radiation Protection Pennsylvania Department of Environmental Protection P.O. Box 8469 Harrisburg, PA 17105-8469 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4 Berwick, PA 18603-0035 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603-0035 Dr. Judith Johnsrud National Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803