{{#Wiki_filter:February 14, 2007Jeffrey S. Forbes, Vice President, Operations
{{#Wiki_filter:February 14, 2007
Jeffrey S. Forbes, Vice President,
  Operations
Arkansas Nuclear One  
Arkansas Nuclear One  
Entergy Operations, Inc.
Entergy Operations, Inc.
1448 S.R. 333
1448 S.R. 333
Russellville, Arkansas  72801-0967SUBJECT:ARKANSAS NUCLEAR ONE - NRC INTEGRATED INSPECTION REPORT05000313/2006005 AND 05000368/2006005Dear Mr. Forbes:
Russellville, Arkansas  72801-0967
On December 31, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed aninspection at your Arkansas Nuclear One, Units 1 and 2, facility.  The enclosed integrated
SUBJECT: ARKANSAS NUCLEAR ONE - NRC INTEGRATED INSPECTION REPORT
05000313/2006005 AND 05000368/2006005
Dear Mr. Forbes:
On December 31, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an
inspection at your Arkansas Nuclear One, Units 1 and 2, facility.  The enclosed integrated
report documents the inspection findings, which were discussed on January 17, 2007, and
report documents the inspection findings, which were discussed on January 17, 2007, and
again on February 8, 2007, with you and other members of your staff.The inspection examined activities conducted under your licenses as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your
again on February 8, 2007, with you and other members of your staff.
The inspection examined activities conducted under your licenses as they relate to safety and
compliance with the Commission's rules and regulations and with the conditions of your
licenses.  The inspectors reviewed selected procedures and records, observed activities, and
licenses.  The inspectors reviewed selected procedures and records, observed activities, and
interviewed personnel.The report documents five self-revealing findings of very low safety significance (Green).  Threeof these findings were determined to involve violations of NRC requirements.  However,
interviewed personnel.
The report documents five self-revealing findings of very low safety significance (Green).  Three
of these findings were determined to involve violations of NRC requirements.  However,
because of the very low safety significance and because they are entered into your corrective
because of the very low safety significance and because they are entered into your corrective
action program, the NRC is treating these findings as noncited violations consistent with
action program, the NRC is treating these findings as noncited violations consistent with
Line 36: Line 46:
76011-4005; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission,
76011-4005; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission,
Washington DC 20555-0001; and the NRC Resident Inspector at Arkansas Nuclear One,
Washington DC 20555-0001; and the NRC Resident Inspector at Arkansas Nuclear One,
Units 1 and 2, facility.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, itsenclosure, and your response (if any) will be made available electronically for public inspection  
Units 1 and 2, facility.
Entergy Operations, Inc.-2-in the NRC Public Document Room or from the Publicly Available Records (PARS) componentof NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter, its
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Sincerely, /RA/Jeffrey A. Clark, ChiefProject Branch E
enclosure, and your response (if any) will be made available electronically for public inspection
Division of Reactor ProjectsDockets:  50-313     50-368Licenses:  DPR-51     NPF-6Enclosure:NRC Inspection Report 05000313/2006005 and 05000368/2006005
 
   w/Attachment:  Supplemental Informationcc w/Enclosure:Senior Vice President  
Entergy Operations, Inc.
-2-
in the NRC Public Document Room or from the Publicly Available Records (PARS) component
of NRCs document system (ADAMS).  ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,  
/RA/
Jeffrey A. Clark, Chief
Project Branch E
Division of Reactor Projects
Dockets:  50-313
    50-368
Licenses:  DPR-51
    NPF-6
Enclosure:
NRC Inspection Report 05000313/2006005 and 05000368/2006005
   w/Attachment:  Supplemental Information
cc w/Enclosure:
Senior Vice President  
   & Chief Operating Officer
   & Chief Operating Officer
Entergy Operations, Inc.
Entergy Operations, Inc.
P.O. Box 31995
P.O. Box 31995
Jackson, MS  39286-1995Vice PresidentOperations Support
Jackson, MS  39286-1995
Vice President
Operations Support
Entergy Operations, Inc.
Entergy Operations, Inc.
P.O. Box 31995
P.O. Box 31995
Jackson, MS  39286-1995General Manager Plant OperationsEntergy Operations, Inc.
Jackson, MS  39286-1995
General Manager Plant Operations
Entergy Operations, Inc.
Arkansas Nuclear One
Arkansas Nuclear One
1448 S. R. 333
1448 S. R. 333
Russellville, AR  72802Director, Nuclear Safety AssuranceEntergy Operations, Inc.
Russellville, AR  72802
Director, Nuclear Safety Assurance
Entergy Operations, Inc.
Arkansas Nuclear One  
Arkansas Nuclear One  
1448 S. R. 333
1448 S. R. 333
Russellville, AR  72802  
Russellville, AR  72802
Entergy Operations, Inc.-3-Manager, LicensingEntergy Operations, Inc.
 
Entergy Operations, Inc.
-3-
Manager, Licensing
Entergy Operations, Inc.
Arkansas Nuclear One
Arkansas Nuclear One
1448 S. R. 333
1448 S. R. 333
Russellville, AR  72802Director, Nuclear Safety & LicensingEntergy Operations, Inc.
Russellville, AR  72802
Director, Nuclear Safety & Licensing
Entergy Operations, Inc.
1340 Echelon Parkway
1340 Echelon Parkway
Jackson, MS  39213-8298Section Chief, Division of HealthRadiation Control Section
Jackson, MS  39213-8298
Section Chief, Division of Health
Radiation Control Section
Arkansas Department of Health and  
Arkansas Department of Health and  
   Human Services
   Human Services
4815 West Markham Street, Slot 30
4815 West Markham Street, Slot 30
Little Rock, AR  72205-3867Section Chief, Division of HealthEmergency Management Section
Little Rock, AR  72205-3867
Section Chief, Division of Health
Emergency Management Section
Arkansas Department of Health and  
Arkansas Department of Health and  
   Human Services
   Human Services
4815 West Markham Street, Slot 30
4815 West Markham Street, Slot 30
Little Rock, AR  72205-3867Manager, Washington Nuclear OperationsABB Combustion Engineering Nuclear
Little Rock, AR  72205-3867
Manager, Washington Nuclear Operations
ABB Combustion Engineering Nuclear
   Power
   Power
12300 Twinbrook Parkway, Suite 330
12300 Twinbrook Parkway, Suite 330
Rockville, MD  20852County Judge of Pope CountyPope County Courthouse
Rockville, MD  20852
County Judge of Pope County
Pope County Courthouse
100 West Main Street
100 West Main Street
Russellville, AR  72801James Mallay Director, Regulatory Affairs
Russellville, AR  72801
James Mallay  
Director, Regulatory Affairs
Framatome ANP
Framatome ANP
3815 Old Forest Road
3815 Old Forest Road
Lynchburg, VA  24501  
Lynchburg, VA  24501
Entergy Operations, Inc.-4-Electronic distribution by RIV:Regional Administrator (BSM1)DRP Director (ATH)DRS Director (DDC)DRS Deputy Director (RJC1)Senior Resident Inspector (RWD)Branch Chief, DRP/E (ZKD)Senior Project Engineer, DRP/E (VGG)Team Leader, DRP/TSS (RLN1)RITS Coordinator (MSH3)DRS STA (DAP)D. Cullison, OEDO RIV Coordinator (DGC)ROPreports
 
ANO Site Secretary (VLH)SUNSI Review Completed:  _JAC__ADAMS:   Yes  No    Initials:  __JAC____   Publicly Available       
Entergy Operations, Inc.
G  Non-Publicly Available       
-4-
G  Sensitive  Non-SensitiveR:\_REACTORS\_ANO\2006\AN2006-05RP-RWD.wpdRIV:RI:DRP/ERI:DRP/ESRI:DRP/EC:DRS/OBCHYoungJEJoseyRWDeeseATGodyT-JACT-JACT-JAC/RA/2/5/20072/5/20072/5/20072/4/2007C:DRS/PSBC:DRS/EB1C:DRS/EB2C:DRP/EMPShannonWBJonesLJSmithJAClark/RA//RA//RA//RA/2/5/20072/1/20072/1/20072/14/2007OFFICIAL RECORD COPYT=Telephone          E=E-mail        F=Fax  
Electronic distribution by RIV:
-1-EnclosureU.S. NUCLEAR REGULATORY COMMISSION REGION IVDockets:50-313, 50-368 Licenses:DPR-51, NPF-6
Regional Administrator (BSM1)
Report:05000313/2006005 and 05000368/2006005
DRP Director (ATH)
Licensee:Entergy Operations, Inc.
DRS Director (DDC)
Facility:Arkansas Nuclear One, Units 1 and 2
DRS Deputy Director (RJC1)
Location:Junction of Hwy. 64W and Hwy. 333 South Russellville, ArkansasDates:September 24 through December 31, 2006
Senior Resident Inspector (RWD)
Inspectors:L. Carson II, Senior Health Physicist, Plant Support BranchR. Deese, Senior Resident Inspector
Branch Chief, DRP/E (ZKD)
Senior Project Engineer, DRP/E (VGG)
Team Leader, DRP/TSS (RLN1)
RITS Coordinator (MSH3)
DRS STA (DAP)
D. Cullison, OEDO RIV Coordinator (DGC)
ROPreports
ANO Site Secretary (VLH)
SUNSI Review Completed:  _JAC__ ADAMS: / Yes  No    Initials:  __JAC____  
Publicly Available      G  Non-Publicly Available      G  Sensitive
/   Non-Sensitive
R:\\_REACTORS\\_ANO\\2006\\AN2006-05RP-RWD.wpd
RIV:RI:DRP/E
RI:DRP/E
SRI:DRP/E
C:DRS/OB
CHYoung
JEJosey
RWDeese
ATGody
T-JAC
T-JAC
T-JAC
/RA/
2/5/2007
2/5/2007
2/5/2007
2/4/2007
C:DRS/PSB
C:DRS/EB1
C:DRS/EB2
C:DRP/E
MPShannon
WBJones
LJSmith
JAClark
/RA/
/RA/
/RA/
/RA/
2/5/2007
2/1/2007
2/1/2007
2/14/2007
OFFICIAL RECORD COPY
T=Telephone          E=E-mail        F=Fax
 
-1-
Enclosure
U.S. NUCLEAR REGULATORY COMMISSION  
REGION IV
Dockets:
50-313, 50-368  
Licenses:
DPR-51, NPF-6
Report:
05000313/2006005 and 05000368/2006005
Licensee:
Entergy Operations, Inc.
Facility:
Arkansas Nuclear One, Units 1 and 2
Location:
Junction of Hwy. 64W and Hwy. 333 South  
Russellville, Arkansas
Dates:
September 24 through December 31, 2006
Inspectors:
L. Carson II, Senior Health Physicist, Plant Support Branch
R. Deese, Senior Resident Inspector
J. Josey, Resident Inspector
J. Josey, Resident Inspector
J. Kirkland, Project Engineer
J. Kirkland, Project Engineer
Line 91: Line 209:
D. Livermore, Senior Project Engineer
D. Livermore, Senior Project Engineer
C. Paulk, Senior Reactor Inspector
C. Paulk, Senior Reactor Inspector
C. Young, Resident InspectorAccompanyingPersonnel:S. Makor, Reactor InspectorApproved By:Jeffrey A. Clark, Chief, Project Branch EDivision of Reactor Projects  
C. Young, Resident Inspector
-2-EnclosureTABLE OF CONTENTSSUMMARY OF FINDINGS....................................................31R01Adverse Weather Protection.......................................61R02Evaluation of Changes, Tests, or Experiments .........................71R04Equipment Alignment.............................................71R05Fire Protection..................................................71R07Heat Sink Performance..........................................101R08Inservice Inspection Activities.....................................101R11Licensed Operator Requalification Program...........................131R12Maintenance Effectiveness.......................................131R13Maintenance Risk Assessments and Emergent Work Control.............141R15Operability Evaluations..........................................151R17Permanent Plant Modifications.....................................171R19Postmaintenance Testing........................................171R20Refueling and Outage Activities....................................181R22Surveillance Testing.............................................211EP4Emergency Action Level and Emergency Plan Changes.................221EP6Drill Evaluation.................................................22RADIATION SAFETY.......................................................232OS1Access Control To Radiologically Significant Areas.....................23OTHER ACTIVITIES........................................................244OA1PI Verification..................................................244OA2Identification and Resolution of Problems............................254OA3Followup of Events and Notices of Enforcement Discretion ..............284OA5 Other Activities.................................................294OA6Meetings, Including Exit..........................................31SUPPLEMENTAL INFORMATION............................................A-1KEY POINTS OF CONTACT................................................A-1LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED...........................A-1LIST OF DOCUMENTS REVIEWED..........................................A-2
Accompanying
LIST OF ACRONYMS......................................................A-9  
Personnel:
-3-EnclosureSUMMARY OF FINDINGSIR 05000313/2006005, 05000368/2006005; 09/24/2006 - 12/31/2006; Arkansas Nuclear One,Units 1 and 2; Fire Protection, Operability Evaluations, Refueling and Outage Activities, Follow-
S. Makor, Reactor Inspector
up of Events and Notices of Enforcement Discretion.This report covered a 3-month period of inspection by resident and regional specialistinspectors.  Five Green findings, three of which were noncited violations were identified.  The
Approved By:
Jeffrey A. Clark, Chief, Project Branch E
Division of Reactor Projects
 
-2-
Enclosure
TABLE OF CONTENTS
SUMMARY OF FINDINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1R01
Adverse Weather Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
1R02
Evaluation of Changes, Tests, or Experiments . . . . . . . . . . . . . . . . . . . . . . . . . 7
1R04
Equipment Alignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1R05
Fire Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1R07
Heat Sink Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1R08
Inservice Inspection Activities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1R11
Licensed Operator Requalification Program . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
1R12
Maintenance Effectiveness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
1R13
Maintenance Risk Assessments and Emergent Work Control . . . . . . . . . . . . . 14
1R15
Operability Evaluations
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
1R17
Permanent Plant Modifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
1R19
Postmaintenance Testing
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
1R20
Refueling and Outage Activities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
1R22
Surveillance Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
1EP4
Emergency Action Level and Emergency Plan Changes . . . . . . . . . . . . . . . . . 22
1EP6
Drill Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
RADIATION SAFETY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
2OS1 Access Control To Radiologically Significant Areas . . . . . . . . . . . . . . . . . . . . . 23
OTHER ACTIVITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
4OA1 PI Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
4OA2 Identification and Resolution of Problems . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
4OA3 Followup of Events and Notices of Enforcement Discretion . . . . . . . . . . . . . . 28
4OA5 Other Activities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
4OA6 Meetings, Including Exit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
SUPPLEMENTAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1
KEY POINTS OF CONTACT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1
LIST OF DOCUMENTS REVIEWED
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-2
LIST OF ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-9
 
-3-
Enclosure
SUMMARY OF FINDINGS
IR 05000313/2006005, 05000368/2006005; 09/24/2006 - 12/31/2006; Arkansas Nuclear One,
Units 1 and 2; Fire Protection, Operability Evaluations, Refueling and Outage Activities, Follow-
up of Events and Notices of Enforcement Discretion.
This report covered a 3-month period of inspection by resident and regional specialist
inspectors.  Five Green findings, three of which were noncited violations were identified.  The
significance of most findings is indicated by their color (Green, White, Yellow, or Red) using
significance of most findings is indicated by their color (Green, White, Yellow, or Red) using
Inspection Manual Chapter 0609, "Significance Determination Process." Findings for which the
Inspection Manual Chapter 0609, Significance Determination Process.  Findings for which the
significance determination process does not apply may be Green or be assigned a severity
significance determination process does not apply may be Green or be assigned a severity
level after NRC management's review.  The NRC's program for overseeing the safe operation
level after NRC management's review.  The NRCs program for overseeing the safe operation
of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight
of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight
Process," Revision 3, dated July 2000.A.NRC-Identified and Self-Revealing FindingsCornerstone:  Initiating Events *Green.  A self-revealing noncited violation of Unit 2 TechnicalSpecification 6.4.1.c, Fire Protection Program Implementation, was identified for
Process, Revision 3, dated July 2000.
the failure of maintenance personnel to follow Procedure EN-DC-127, "Control of
A.
Hot Work and Ignition Sources," while performing hot work.  Specifically, the
NRC-Identified and Self-Revealing Findings
Cornerstone:  Initiating Events  
*
Green.  A self-revealing noncited violation of Unit 2 Technical
Specification 6.4.1.c, Fire Protection Program Implementation, was identified for
the failure of maintenance personnel to follow Procedure EN-DC-127, Control of
Hot Work and Ignition Sources, while performing hot work.  Specifically, the
licensee failed to ensure that combustible material within 35 feet of the work area
licensee failed to ensure that combustible material within 35 feet of the work area
was removed or protected.  Consequently, torch cutting activities near the Unit 2
was removed or protected.  Consequently, torch cutting activities near the Unit 2
Line 111: Line 299:
Report ANO-2-2006-1701.  A number of additional examples of hot work
Report ANO-2-2006-1701.  A number of additional examples of hot work
activities that involved inadequate implementation of applicable hot work control
activities that involved inadequate implementation of applicable hot work control
procedures were also identified.The finding is greater than minor because it is associated with the protectionagainst external factors attribute of the initiating events cornerstone, and it
procedures were also identified.
The finding is greater than minor because it is associated with the protection
against external factors attribute of the initiating events cornerstone, and it
directly affects the cornerstone objective to limit the likelihood of those events
directly affects the cornerstone objective to limit the likelihood of those events
that upset plant stability and challenge critical safety functions during shutdown
that upset plant stability and challenge critical safety functions during shutdown
Line 121: Line 311:
significance determination process nor the shutdown operations significance
significance determination process nor the shutdown operations significance
determination process address shutdown fire protection findings.  However, the
determination process address shutdown fire protection findings.  However, the
finding is determined to be of very low safety significance by NRC management's
finding is determined to be of very low safety significance by NRC managements
review because the finding occurred while the unit was already in a cold
review because the finding occurred while the unit was already in a cold
shutdown condition, and the operability of equipment necessary to maintain safe  
shutdown condition, and the operability of equipment necessary to maintain safe
-4-Enclosureshutdown was not challenged.  The cause of the finding is related to thecrosscutting element of human performance associated with work practicesbecause the fire watch failed to use error prevention techniques like self
 
-4-
Enclosure
shutdown was not challenged.  The cause of the finding is related to the
crosscutting element of human performance associated with work practices
because the fire watch failed to use error prevention techniques like self
checking and peer checking which would have prevented the event
checking and peer checking which would have prevented the event
(Section 1R05).*Green.  A self-revealing noncited violation of Unit 2 TechnicalSpecification 6.4.1.a, "Procedures," was identified when an operator failed to
(Section 1R05).
*
Green.  A self-revealing noncited violation of Unit 2 Technical
Specification 6.4.1.a, Procedures, was identified when an operator failed to
close Valve 2DCH-11, resin sluice header drain valve, when securing from a
close Valve 2DCH-11, resin sluice header drain valve, when securing from a
resin transfer as required by procedure.  One week later, while aligning the plant
resin transfer as required by procedure.  One week later, while aligning the plant
Line 132: Line 330:
unanticipated loss of approximately 230 gallons of reactor coolant system
unanticipated loss of approximately 230 gallons of reactor coolant system
inventory occurred.  This issue was entered into the licensee's corrective action
inventory occurred.  This issue was entered into the licensee's corrective action
program as Condition Report ANO-2-2006-1464.The finding was determined to be more than minor because it affected theconfiguration control attribute of the initiating events cornerstone objective to limit
program as Condition Report ANO-2-2006-1464.
The finding was determined to be more than minor because it affected the
configuration control attribute of the initiating events cornerstone objective to limit
the likelihood of those events that upset plant stability and challenge critical
the likelihood of those events that upset plant stability and challenge critical
safety functions during shutdown as well as power operations.  Using the
safety functions during shutdown as well as power operations.  Using the
Line 139: Line 339:
result in a loss of 2 feet or more of reactor coolant system inventory and did not
result in a loss of 2 feet or more of reactor coolant system inventory and did not
result in a loss of reactor coolant system inventory while in reduced inventory.  
result in a loss of reactor coolant system inventory while in reduced inventory.  
The cause of the finding is related to the crosscutting element of humanperformance associated with work practices because the operator failed to use
The cause of the finding is related to the crosscutting element of human
performance associated with work practices because the operator failed to use
error prevention techniques like self checking and peer checking which would
error prevention techniques like self checking and peer checking which would
have prevented the event (Section 1R20).*Green.  A self-revealing finding was identified associated with the licensee'spractice of using a hammer to remove the main hook pin on the Unit 2 polar
have prevented the event (Section 1R20).
*
Green.  A self-revealing finding was identified associated with the licensees
practice of using a hammer to remove the main hook pin on the Unit 2 polar
crane.  Specifically, the license failure to provide clear guidance and training
crane.  Specifically, the license failure to provide clear guidance and training
resulted in station personnel cold working by the main hook and load cell pins
resulted in station personnel cold working by the main hook and load cell pins
Line 149: Line 353:
decay heat removal while the unit remained in a lowered vessel level condition
decay heat removal while the unit remained in a lowered vessel level condition
for an additional unplanned 27 hours.  This issue was entered into the licensee's
for an additional unplanned 27 hours.  This issue was entered into the licensee's
corrective action program as Condition Report ANO-2-2006-1553.The finding was determined to be more than minor because it affected theequipment performance attribute of the initiating events cornerstone objective to
corrective action program as Condition Report ANO-2-2006-1553.
The finding was determined to be more than minor because it affected the
equipment performance attribute of the initiating events cornerstone objective to
limit the likelihood of those events that upset plant stability and challenge critical
limit the likelihood of those events that upset plant stability and challenge critical
safety functions during shutdown as well as power operations.  This finding was
safety functions during shutdown as well as power operations.  This finding was
Line 155: Line 361:
operations significance determination process because the event did not involve
operations significance determination process because the event did not involve
a loss of shutdown control or a reduction in mitigation capability which would
a loss of shutdown control or a reduction in mitigation capability which would
have increased the frequency of occurrence of a loss of decay heat removal.  
have increased the frequency of occurrence of a loss of decay heat removal.
-5-EnclosureThe cause of this finding is relat
 
ed to the crosscutting element of humanperformance associated with resources because the training of personnel and
-5-
procedural guidance available was adequate (Section 1R20).*Green.  A self-revealing finding was identified when the Unit 1 main feedwaterPump A tripped, resulting in a plant run back to 40 percent reactor power.  The
Enclosure
The cause of this finding is related to the crosscutting element of human
performance associated with resources because the training of personnel and
procedural guidance available was adequate (Section 1R20).
*
Green.  A self-revealing finding was identified when the Unit 1 main feedwater
Pump A tripped, resulting in a plant run back to 40 percent reactor power.  The
trip occurred due to electromagnetic interference from an air conditioning unit
trip occurred due to electromagnetic interference from an air conditioning unit
recently installed on top of the main feedwater pump cabinet.  This interference
recently installed on top of the main feedwater pump cabinet.  This interference
Line 164: Line 376:
feedwater pump turbine when no such actual condition occurred.  This issue was
feedwater pump turbine when no such actual condition occurred.  This issue was
entered into the licensee's corrective action program as Condition
entered into the licensee's corrective action program as Condition
Report ANO-1-2006-1399.The finding was determined to be more than minor because it affected thedesign control attribute of the initiating events cornerstone objective to limit the
Report ANO-1-2006-1399.
The finding was determined to be more than minor because it affected the
design control attribute of the initiating events cornerstone objective to limit the
likelihood of those events that upset plant stability and challenge critical safety
likelihood of those events that upset plant stability and challenge critical safety
functions during shutdown as well as power operations.  Using Manual
functions during shutdown as well as power operations.  Using Manual
Chapter 0609, "Significance Determination Process," Phase 1 Worksheet, the
Chapter 0609, Significance Determination Process, Phase 1 Worksheet, the
finding is determined to have very low safety significance because the condition
finding is determined to have very low safety significance because the condition
only affected the initiating events cornerstone and did not contribute to both the
only affected the initiating events cornerstone and did not contribute to both the
Line 173: Line 387:
functions will not be available.  The finding had crosscutting aspects in the area
functions will not be available.  The finding had crosscutting aspects in the area
of problem identification and resolution associated with operating experience
of problem identification and resolution associated with operating experience
because the licensee's failure to implement and institutionalize OE through
because the licensees failure to implement and institutionalize OE through
changes to station processes and procedures (Section 4OA3).Cornerstone:  Mitigating Systems*Green.  A self-revealing noncited violation of ANO Unit 2 LicenseCondition 2.C.(3)(b), "Fire Protection," was identified for failure of the licensee to
changes to station processes and procedures (Section 4OA3).
Cornerstone:  Mitigating Systems
*
Green.  A self-revealing noncited violation of ANO Unit 2 License
Condition 2.C.(3)(b), Fire Protection, was identified for failure of the licensee to
maintain the lube oil collection system for Reactor Coolant Pumps C and D in an
maintain the lube oil collection system for Reactor Coolant Pumps C and D in an
operable condition.  Specifically, the licensee failed to perform a modification on
operable condition.  Specifically, the licensee failed to perform a modification on
Line 180: Line 398:
collection tank and its associated overfill berm being filled with water from the
collection tank and its associated overfill berm being filled with water from the
component cooling water system.  This issue was entered into the licensee's
component cooling water system.  This issue was entered into the licensee's
corrective action program as Condition Report ANO-2-2006-1407.The finding was determined to be more than minor because it affected theprotection against external factors attribute of the mitigating systems cornerstone
corrective action program as Condition Report ANO-2-2006-1407.
The finding was determined to be more than minor because it affected the
protection against external factors attribute of the mitigating systems cornerstone
objective to ensure the availability, reliability, and capability of systems that
objective to ensure the availability, reliability, and capability of systems that
respond to initiating events to prevent undesirable consequences.  Using the fire
respond to initiating events to prevent undesirable consequences.  Using the fire
protection significance determination process, the finding is determined to have
protection significance determination process, the finding is determined to have
very low safety significance because the condition constituted a low degradation
very low safety significance because the condition constituted a low degradation
of a fire prevention and administrative controls feature (Section 1R15).B.Licensee-Identified Violations
of a fire prevention and administrative controls feature (Section 1R15).
None.  
B.
-6-EnclosureREPORT DETAILSSummary of Plant StatusUnit 1 began the inspection period at 100 percent rated thermal power (RTP) and remainedthere until November 9, 2006, when a trip of the Main Feedwater Pump A occurred due to a
Licensee-Identified Violations
None.
 
-6-
Enclosure
REPORT DETAILS
Summary of Plant Status
Unit 1 began the inspection period at 100 percent rated thermal power (RTP) and remained
there until November 9, 2006, when a trip of the Main Feedwater Pump A occurred due to a
malfunction associated with the electronic overspeed trip device.  The trip resulted in an
malfunction associated with the electronic overspeed trip device.  The trip resulted in an
automatic runback to 40 percent RTP.  Unit 1 returned to 100 percent RTP on  
automatic runback to 40 percent RTP.  Unit 1 returned to 100 percent RTP on  
November 10 and remained there for the remainder of the inspection period. Unit 2 began the inspection period with the reactor shut down for Refueling Outage 2R18. Following the refueling outage, the Unit 2 reactor achieved criticality on October 27 and main
November 10 and remained there for the remainder of the inspection period.  
Unit 2 began the inspection period with the reactor shut down for Refueling Outage 2R18.  
Following the refueling outage, the Unit 2 reactor achieved criticality on October 27 and main
generator output breakers were closed on October 28.  Approximately 67 percent RTP was
generator output breakers were closed on October 28.  Approximately 67 percent RTP was
achieved on October 30 when the unit performed a Technical Specification (TS) required
achieved on October 30 when the unit performed a Technical Specification (TS) required
Line 196: Line 426:
was restarted, and main generator output breakers were closed on November 1.  The unit
was restarted, and main generator output breakers were closed on November 1.  The unit
achieved 100 percent RTP on November 3 and remained there for the remainder of the
achieved 100 percent RTP on November 3 and remained there for the remainder of the
inspection period.1.REACTOR SAFETYCornerstones:  Initiating Events, Mitigating Systems, Barrier Integrity1R01Adverse Weather Protection (71111.01).1Readiness for Impending Adverse Weather ConditionsOn November 30 the inspectors completed a review of the licensee's readiness forimpending adverse weather involving icy weather.  The inspectors:  (1) reviewed plant
inspection period.
1.
REACTOR SAFETY
Cornerstones:  Initiating Events, Mitigating Systems, Barrier Integrity
1R01
Adverse Weather Protection (71111.01)
.1
Readiness for Impending Adverse Weather Conditions
On November 30 the inspectors completed a review of the licensee's readiness for
impending adverse weather involving icy weather.  The inspectors:  (1) reviewed plant
procedures, the Updated Final Safety Analysis Reports (UFSAR), and TSs to ensure
procedures, the Updated Final Safety Analysis Reports (UFSAR), and TSs to ensure
that operator actions defined in adverse weather procedures maintained the readiness
that operator actions defined in adverse weather procedures maintained the readiness
Line 206: Line 445:
anticipated ice storm developed; and (4) reviewed plant modifications, procedure
anticipated ice storm developed; and (4) reviewed plant modifications, procedure
revisions, and operator work arounds to determine if recent facility changes challenged
revisions, and operator work arounds to determine if recent facility changes challenged
plant operation.November 30, 2006, Units 1 and 2, offsite electrical distribution systemsDocuments reviewed by the inspectors are listed in the attachment.  
plant operation.
The inspectors completed one sample.  
C
-7-Enclosure1R02Evaluation of Changes, Tests, or Experiments (71111.02)     a.Inspection ScopeThe inspectors reviewed the effectiveness of the licensee's implementation of changesto the facility structures, systems, and components (SSCs); risk-significant normal and
November 30, 2006, Units 1 and 2, offsite electrical distribution systems
Documents reviewed by the inspectors are listed in the attachment.  
The inspectors completed one sample.
 
-7-
Enclosure
1R02
Evaluation of Changes, Tests, or Experiments (71111.02)
    a.
Inspection Scope
The inspectors reviewed the effectiveness of the licensees implementation of changes
to the facility structures, systems, and components (SSCs); risk-significant normal and
emergency operating procedures; test programs; and the UFSAR in accordance with
emergency operating procedures; test programs; and the UFSAR in accordance with
10 CFR 50.59, "Changes, Tests, and Experiments." The inspectors reviewed the safety
10 CFR 50.59, Changes, Tests, and Experiments.  The inspectors reviewed the safety
evaluations performed by the licensee dealing with the Unit 2 pressurizer replacement.  
evaluations performed by the licensee dealing with the Unit 2 pressurizer replacement.  
The evaluations were reviewed to verify that licensee personnel had appropriately
The evaluations were reviewed to verify that licensee personnel had appropriately
Line 216: Line 466:
procedures or conduct tests or experiments without prior NRC approval.  Procedures,
procedures or conduct tests or experiments without prior NRC approval.  Procedures,
evaluations, screenings, and applicability determinations reviewed are listed in the
evaluations, screenings, and applicability determinations reviewed are listed in the
attachment to this report.      b.FindingsNo findings of significance were identified.1R04Equipment Alignment (71111.04).1Partial WalkdownThe inspectors:  (1) walked down portions of the two below listed risk important systemsand reviewed plant procedures and documents to verify that critical portions of the
attachment to this report.  
     b.
Findings
No findings of significance were identified.
1R04
Equipment Alignment (71111.04)
.1
Partial Walkdown
The inspectors:  (1) walked down portions of the two below listed risk important systems
and reviewed plant procedures and documents to verify that critical portions of the
selected systems were correctly aligned, and (2) compared deficiencies identified during
selected systems were correctly aligned, and (2) compared deficiencies identified during
the walkdown to the licensee's UFSAR and corrective action program (CAP) to ensure
the walkdown to the licensees UFSAR and corrective action program (CAP) to ensure
problems were being identified and corrected.*October 3, 2006, Unit 1, Emergency Diesel Generator (EDG) K-4A*December 13, 2006, Unit 1, reactor building spray system Train ADocuments reviewed by the inspectors are listed in the attachment.
problems were being identified and corrected.
The inspectors completed two samples.     b.FindingsNo findings of significance were identified.1R05Fire Protection (71111.05).1Quarterly InspectionThe inspectors walked down the six below listed plant areas to assess the materialcondition of active and passive fire protection features and their operational lineup and
*
October 3, 2006, Unit 1, Emergency Diesel Generator (EDG) K-4A
*
December 13, 2006, Unit 1, reactor building spray system Train A
Documents reviewed by the inspectors are listed in the attachment.
The inspectors completed two samples.
    b.
Findings
No findings of significance were identified.
1R05
Fire Protection (71111.05)
.1
Quarterly Inspection
The inspectors walked down the six below listed plant areas to assess the material
condition of active and passive fire protection features and their operational lineup and
readiness.  The inspectors:  (1) verified that transient combustibles and hot work
readiness.  The inspectors:  (1) verified that transient combustibles and hot work
activities were controlled in accordance with plant procedures; (2) observed the
activities were controlled in accordance with plant procedures; (2) observed the
condition of fire detection devices to verify they remained functional; (3) observed fire  
condition of fire detection devices to verify they remained functional; (3) observed fire
-8-Enclosuresuppression systems to verify they remained functional and that access to manualactuators was unobstructed; (4) verified that fire extinguishers and hose stations were
 
-8-
Enclosure
suppression systems to verify they remained functional and that access to manual
actuators was unobstructed; (4) verified that fire extinguishers and hose stations were
provided at their designated locations and that they were in a satisfactory condition;
provided at their designated locations and that they were in a satisfactory condition;
(5) verified that passive fire protection features (electrical raceway barriers, fire doors,
(5) verified that passive fire protection features (electrical raceway barriers, fire doors,
Line 232: Line 509:
compensatory measures were commensurate with the significance of the deficiency;
compensatory measures were commensurate with the significance of the deficiency;
and (7) reviewed the UFSAR to determine if the licensee identified and corrected fire
and (7) reviewed the UFSAR to determine if the licensee identified and corrected fire
protection problems.*September 25, 2006, Unit 2, Fire Zone 2032-K, containment building (south side)
protection problems.
*October 17, 2006, Unit 1, Fire Zone 98-J, EDG access corridor
*
*December 13, 2006, Unit 1, Fire Zones 4-EE, 12-EE, and 14-EE, Elevation 317feet of the auxiliary building, west decay heat removal pump room*December 26, 2006, Unit 2, Fire Zone 2040-JJ, access corridor; charging pump;radwaste and boron management system area*December 27, 2006, Unit 1, Fire Zone 67-U, lab and demineralizer access area
September 25, 2006, Unit 2, Fire Zone 2032-K, containment building (south side)
*December 27, 2006, Unit 1, Fire Zone 79-U, upper north piping penetration room
*
October 17, 2006, Unit 1, Fire Zone 98-J, EDG access corridor
*
December 13, 2006, Unit 1, Fire Zones 4-EE, 12-EE, and 14-EE, Elevation 317
feet of the auxiliary building, west decay heat removal pump room
*
December 26, 2006, Unit 2, Fire Zone 2040-JJ, access corridor; charging pump;
radwaste and boron management system area
*
December 27, 2006, Unit 1, Fire Zone 67-U, lab and demineralizer access area
*
December 27, 2006, Unit 1, Fire Zone 79-U, upper north piping penetration room
Documents reviewed by the inspectors are listed in the attachment.  
Documents reviewed by the inspectors are listed in the attachment.  
The inspectors completed six samples.     b.FindingsIntroduction.  A self-revealing, Green noncited violation of TS 6.4.1.c was identified forthe licensee's failure to adequately implement their procedure for the control of hot work
The inspectors completed six samples.
and ignition sources while performing hot work activities.Description.  On September 25, 2006, hot work activities were being performed on theUnit 2 containment sump strainer.  A plastic bag was being utilized at a nearby step-off
    b.
Findings
Introduction.  A self-revealing, Green noncited violation of TS 6.4.1.c was identified for
the licensees failure to adequately implement their procedure for the control of hot work
and ignition sources while performing hot work activities.
Description.  On September 25, 2006, hot work activities were being performed on the
Unit 2 containment sump strainer.  A plastic bag was being utilized at a nearby step-off
pad at the high contamination area boundary as a receptacle for used protective
pad at the high contamination area boundary as a receptacle for used protective
clothing.  While torch cutting on the west containment sump strainer door was in
clothing.  While torch cutting on the west containment sump strainer door was in
progress, sparks from the activity caused the plastic bag to ignite.  The inspectors
progress, sparks from the activity caused the plastic bag to ignite.  The inspectors
identified the fire to the firewatch, who was in the vicinity.  The bag was extinguished by
identified the fire to the firewatch, who was in the vicinity.  The bag was extinguished by
smothering soon thereafter by the workers that were involved in the hot work activity.Procedure EN-DC-127, "Control of Hot Work and Ignition Sources," Revision 2, requiresthat combustible material within 35 feet of the work area that could become ignited from
smothering soon thereafter by the workers that were involved in the hot work activity.
Procedure EN-DC-127, Control of Hot Work and Ignition Sources, Revision 2, requires
that combustible material within 35 feet of the work area that could become ignited from
the hot work shall be removed or protected.  Procedure EN-DC-127, Attachment 9.1,
the hot work shall be removed or protected.  Procedure EN-DC-127, Attachment 9.1,
"Hot Work Permit," was issued for this activity and showed that this requirement to be
Hot Work Permit, was issued for this activity and showed that this requirement to be
checked off by the hot work supervisor as being completed.  The inspectors noted that
checked off by the hot work supervisor as being completed.  The inspectors noted that
the bag was within 35 feet of the work area and had not been removed.  
the bag was within 35 feet of the work area and had not been removed.
-9-EnclosureCorrective actions that were taken by the licensee in response to this event to preventrecurrence included:  moving the step-off pad farther away from the work area, clearing
 
-9-
Enclosure
Corrective actions that were taken by the licensee in response to this event to prevent
recurrence included:  moving the step-off pad farther away from the work area, clearing
the area near the door of unnecessary equipment and materials, coaching the firewatch
the area near the door of unnecessary equipment and materials, coaching the firewatch
and his supervisor concerning the responsibility of the firewatch and how to deal with
and his supervisor concerning the responsibility of the firewatch and how to deal with
distractions, discussing alternatives to more effectively contain sparks from the cuttingoperation, discussing the event with craft personnel, and conducting more frequent area
distractions, discussing alternatives to more effectively contain sparks from the cutting
inspections.A number of additional deficiencies were identified through a review of recent licenseeperformance in the conduct of related hot work activities.  Section 4OA2 of this
operation, discussing the event with craft personnel, and conducting more frequent area
inspections.
A number of additional deficiencies were identified through a review of recent licensee
performance in the conduct of related hot work activities.  Section 4OA2 of this
enclosure contains some details of other instances that occurred during the Unit 2
enclosure contains some details of other instances that occurred during the Unit 2
Refueling Outage 2R18.  Also, three examples involving circumstances similar to the
Refueling Outage 2R18.  Also, three examples involving circumstances similar to the
Line 262: Line 565:
combustible materials in the Unit 1 turbine building basement were caused by hot work
combustible materials in the Unit 1 turbine building basement were caused by hot work
activities that were being performed on the levels above.  There was no firewatch posted
activities that were being performed on the levels above.  There was no firewatch posted
on the basement level.Each of these instances was entered into the licensee's CAP.  These occurrencesrepresent instances of inadequate implementation of applicable hot work control
on the basement level.
Each of these instances was entered into the licensees CAP.  These occurrences
represent instances of inadequate implementation of applicable hot work control
procedures.  The inspectors concluded that the recent increase in the number of related
procedures.  The inspectors concluded that the recent increase in the number of related
findings when compared to past occurrences represented a trend which, if left
findings when compared to past occurrences represented a trend which, if left
uncorrected, could become a more significant safety concern in that it could result in a
uncorrected, could become a more significant safety concern in that it could result in a
fire in or near risk important equipment.Analysis.  The performance deficiency associated with this finding involved the failure ofmaintenance personnel to adequately implement the licensee's procedure for control of
fire in or near risk important equipment.
Analysis.  The performance deficiency associated with this finding involved the failure of
maintenance personnel to adequately implement the licensees procedure for control of
hot work and ignition sources.  The finding is greater than minor because it is
hot work and ignition sources.  The finding is greater than minor because it is
associated with the protection against external factors attribute of the initiating events
associated with the protection against external factors attribute of the initiating events
Line 274: Line 581:
work in a manner that results in unintended combustion of nearby materials would
work in a manner that results in unintended combustion of nearby materials would
become a more significant safety concern in that it could result in a fire in or near risk
become a more significant safety concern in that it could result in a fire in or near risk
important equipment.  Manual Chapter (MC) 0609, "Significance Determination
important equipment.  Manual Chapter (MC) 0609, Significance Determination
Process," Appendix F, "Fire Protection Significance Determination Process," does not
Process, Appendix F, Fire Protection Significance Determination Process, does not
address the potential risk significance of shutdown fire protection findings.  Additionally,
address the potential risk significance of shutdown fire protection findings.  Additionally,
MC 0609, Appendix G, "Shutdown Operations Significance Determination Process,"
MC 0609, Appendix G, Shutdown Operations Significance Determination Process,
does not address fire protection findings.  Thus, the finding is not suitable for
does not address fire protection findings.  Thus, the finding is not suitable for
significance determination process evaluation, but has been reviewed by NRC
significance determination process evaluation, but has been reviewed by NRC
Line 283: Line 590:
occurred while the unit was already in a cold shutdown condition; and the operability of
occurred while the unit was already in a cold shutdown condition; and the operability of
equipment necessary to maintain safe shutdown was not challenged.  The cause of the
equipment necessary to maintain safe shutdown was not challenged.  The cause of the
finding is related to the crosscutting element of human performance in that maintenancepersonnel failed to follow procedures.  
finding is related to the crosscutting element of human performance in that maintenance
-10-EnclosureEnforcement.  Unit 2 TS 6.4, "Procedures," requires that written procedures beestablished, implemented, and maintained covering fire protection program
personnel failed to follow procedures.
implementation.  Procedure EN-DC-127, "Control of Hot Work and Ignition Sources," is
 
-10-
Enclosure
Enforcement.  Unit 2 TS 6.4, Procedures, requires that written procedures be
established, implemented, and maintained covering fire protection program
implementation.  Procedure EN-DC-127, Control of Hot Work and Ignition Sources, is
one of those procedures and requires that combustible material within 35 feet of the
one of those procedures and requires that combustible material within 35 feet of the
work area that could become ignited from the hot work shall be removed or protected.  
work area that could become ignited from the hot work shall be removed or protected.  
Contrary to this, on September 25, 2006, maintenance personnel failed to remove or
Contrary to this, on September 25, 2006, maintenance personnel failed to remove or
protect combustible material within 35 feet of the work area.  Because the finding is of
protect combustible material within 35 feet of the work area.  Because the finding is of
very low safety significance and has been entered into the licensee's CAP as Condition
very low safety significance and has been entered into the licensees CAP as Condition
Reports (CRs) ANO-2-2006-1565 and CR ANO-2-2006-1701, this violation is being
Reports (CRs) ANO-2-2006-1565 and CR ANO-2-2006-1701, this violation is being
treated as an NCV consistent with Section VIA of the Enforcement Policy:   
treated as an NCV consistent with Section VIA of the Enforcement Policy:   
NCV 05000368/2006005-01, "Fire During Hot Work Activities on the Containment Sump
NCV 05000368/2006005-01, Fire During Hot Work Activities on the Containment Sump
Strainer."1R07Heat Sink Performance (71111.07)     a.Inspection ScopeThe inspectors reviewed licensee programs, verified performance against industrystandards, and reviewed critical operating parameters and maintenance records for the
Strainer.
1R07
Heat Sink Performance (71111.07)
    a.
Inspection Scope
The inspectors reviewed licensee programs, verified performance against industry
standards, and reviewed critical operating parameters and maintenance records for the
Unit 1 EDG A cooling water heat exchanger.  The inspectors verified that:  
Unit 1 EDG A cooling water heat exchanger.  The inspectors verified that:  
(1) performance tests were satisfactorily conducted for heat enchanters/heat sinks and
(1) performance tests were satisfactorily conducted for heat enchanters/heat sinks and
reviewed for problems or errors; (2) the licensee utilized the periodic maintenance
reviewed for problems or errors; (2) the licensee utilized the periodic maintenance
method outlined in EPRI NP-7552, "Heat Exchanger Performance Monitoring
method outlined in EPRI NP-7552, Heat Exchanger Performance Monitoring
Guidelines"; (3) the licensee properly utilized befalling controls; (4) the licensee's heat
Guidelines; (3) the licensee properly utilized befalling controls; (4) the licensees heat
exchanger inspections adequately assessed the state of cleanliness of their tubes; and
exchanger inspections adequately assessed the state of cleanliness of their tubes; and
(5) the heat exchanger was correctly categorized under the Maintenance Rule.*September 5, 2006, Unit 1 EDG A cooling water heat exchanger
(5) the heat exchanger was correctly categorized under the Maintenance Rule.
*
September 5, 2006, Unit 1 EDG A cooling water heat exchanger
Documents reviewed by the inspectors are listed in the attachment.
Documents reviewed by the inspectors are listed in the attachment.
The inspectors completed one sample.     b.FindingsNo findings of significance were identified.1R08Inservice Inspection Activities (71111.08)Inspection Procedure 71111.08 requires four samples size as identified inSections 02.01, 02.02, 02.03, and 02.04.  
The inspectors completed one sample.
-11-Enclosure     a.Inspection Scope.1Performance of Nondestructive Examination (NDE) Activities Other than SteamGenerator Tube Inspections, Pressurized Water Reactor (PWR) Vessel Upper HeadPenetration Inspections, Boric Acid Corrosion ControlThe inspection procedure requires the review of NDE activities consisting of two or threedifferent types (i.e., volumetric, surface, or visual).  The inspectors observed the
    b.
Findings
No findings of significance were identified.
1R08
Inservice Inspection Activities (71111.08)
Inspection Procedure 71111.08 requires four samples size as identified in
Sections 02.01, 02.02, 02.03, and 02.04.
 
-11-
Enclosure
    a.
Inspection Scope
.1
Performance of Nondestructive Examination (NDE) Activities Other than Steam
Generator Tube Inspections, Pressurized Water Reactor (PWR) Vessel Upper Head
Penetration Inspections, Boric Acid Corrosion Control
The inspection procedure requires the review of NDE activities consisting of two or three
different types (i.e., volumetric, surface, or visual).  The inspectors observed the
performance of three ultrasonic examinations (volumetric) (one on a section of service
performance of three ultrasonic examinations (volumetric) (one on a section of service
water piping for wall thickness and two on field welds in the pressurizer spray line).  The
water piping for wall thickness and two on field welds in the pressurizer spray line).  The
inspectors also reviewed the radiographic examinations (volumetric) of the two spray
inspectors also reviewed the radiographic examinations (volumetric) of the two spray
line welds.  (The welds are identified in the attachment to this report.) For each of the observed NDE activities, the inspectors verified that the examinationswere performed in accordance with the specific site procedures and the applicable
line welds.  (The welds are identified in the attachment to this report.)  
For each of the observed NDE activities, the inspectors verified that the examinations
were performed in accordance with the specific site procedures and the applicable
American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME
American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME
Code) requirements.During review of each examination, the inspectors verified that appropriateNDE procedures were used, examinations and conditions were as specified in the
Code) requirements.
During review of each examination, the inspectors verified that appropriate
NDE procedures were used, examinations and conditions were as specified in the
procedure, and test instrumentation or equipment was properly calibrated and within the
procedure, and test instrumentation or equipment was properly calibrated and within the
allowable calibration period.  The inspectors also verified the NDE certifications of the
allowable calibration period.  The inspectors also verified the NDE certifications of the
personnel who performed the above volumetric examinations.  Finally, the inspectors
personnel who performed the above volumetric examinations.  Finally, the inspectors
observed that indications identified during the radiographic examinations weredispositioned in accordance with the ASME Code-qualified NDE procedures used to
observed that indications identified during the radiographic examinations were
perform the examinations.The inspection procedure requires review of one or two examinations with recordableindications that were accepted for continued service to ensure that the disposition was
dispositioned in accordance with the ASME Code-qualified NDE procedures used to
perform the examinations.
The inspection procedure requires review of one or two examinations with recordable
indications that were accepted for continued service to ensure that the disposition was
made in accordance with the ASME Code.  The inspectors were informed that no
made in accordance with the ASME Code.  The inspectors were informed that no
indications exceeding ASME Code allowables were known to be in service.The inspection procedure further requires verification of one to three welds on Class 1or 2 pressure boundary piping to ensure that the welding process and welding
indications exceeding ASME Code allowables were known to be in service.
The inspection procedure further requires verification of one to three welds on Class 1
or 2 pressure boundary piping to ensure that the welding process and welding
examinations were performed in accordance with the ASME Code.  The inspectors
examinations were performed in accordance with the ASME Code.  The inspectors
observed welding performed on a safety injection system valve in the prefabrication
observed welding performed on a safety injection system valve in the prefabrication
Line 323: Line 669:
Sections IX and XI of the ASME Code.  This included review of welding material issue
Sections IX and XI of the ASME Code.  This included review of welding material issue
slips to establish that the appropriate welding materials had been used and verification
slips to establish that the appropriate welding materials had been used and verification
that the welding procedure specification (WPS E-P8-T-A8,Ar, "Manual Gas Tungsten
that the welding procedure specification (WPS E-P8-T-A8,Ar, Manual Gas Tungsten
Arc Welding (GTAW) of P-No. 8 Stainless Steels," Revision 0) had been properly
Arc Welding (GTAW) of P-No. 8 Stainless Steels, Revision 0) had been properly
qualified.The inspectors completed the one sample required by Section 02.01..2Reactor Vessel Upper Head Penetration Inspection ActivitiesThe inspection requirements for this section parallel the inspection requirement steps inSection 02.01.  The inspectors observed the NDEs on nine reactor vessel upper head  
qualified.
-12-Enclosurepenetrations.  There were eight control element drive mechanism penetrations (Nos. 12,21, 58, 59, 60, 61, 72, and 79) and one incore instrumentation penetration (No. 82).The inspectors verified that the nondestructive activities were performed in accordancewith the requirements of NRC Order EA-03-009.  The NDEs performed during the NRC
The inspectors completed the one sample required by Section 02.01.
inspection did not reveal any defects or indications. The inspectors completed the one sample required by Section 02.02..3Boric Acid Corrosion Control Inspection Activities (PWRs)The inspectors evaluated the implementation of the licensee's boric acid corrosioncontrol program for monitoring degradation of those systems that could be deleteriously
.2
Reactor Vessel Upper Head Penetration Inspection Activities
The inspection requirements for this section parallel the inspection requirement steps in
Section 02.01.  The inspectors observed the NDEs on nine reactor vessel upper head
 
-12-
Enclosure
penetrations.  There were eight control element drive mechanism penetrations (Nos. 12,
21, 58, 59, 60, 61, 72, and 79) and one incore instrumentation penetration (No. 82).
The inspectors verified that the nondestructive activities were performed in accordance
with the requirements of NRC Order EA-03-009.  The NDEs performed during the NRC
inspection did not reveal any defects or indications.  
The inspectors completed the one sample required by Section 02.02.
.3
Boric Acid Corrosion Control Inspection Activities (PWRs)
The inspectors evaluated the implementation of the licensees boric acid corrosion
control program for monitoring degradation of those systems that could be deleteriously
affected by boric acid corrosion.  The inspection procedure requires review of a sample
affected by boric acid corrosion.  The inspection procedure requires review of a sample
of boric acid corrosion control walkdown visual examination activities through either
of boric acid corrosion control walkdown visual examination activities through either
direct observation or record review.  The inspectors reviewed the documentation
direct observation or record review.  The inspectors reviewed the documentation
associated with the licensee's boric acid corrosion control walkdown.  Additionally, the
associated with the licensees boric acid corrosion control walkdown.  Additionally, the
inspectors performed independent observations of piping containing boric acid during
inspectors performed independent observations of piping containing boric acid during
walkdowns of the containment building and the auxiliary building. The inspection procedure requires verification that visual inspections emphasizelocations where boric acid leaks can cause degradation of safety significant
walkdowns of the containment building and the auxiliary building.  
The inspection procedure requires verification that visual inspections emphasize
locations where boric acid leaks can cause degradation of safety significant
components.  The inspectors verified through direct observation and program/record
components.  The inspectors verified through direct observation and program/record
review that the licensee's boric acid corrosion control inspection efforts are directed
review that the licensees boric acid corrosion control inspection efforts are directed
towards locations where boric acid leaks can cause degradation of safety-related
towards locations where boric acid leaks can cause degradation of safety-related
components.The inspection procedure requires both a review of one to three engineering evaluationsperformed for boric acid leaks found on reactor coolant system (RCS) piping and
components.
The inspection procedure requires both a review of one to three engineering evaluations
performed for boric acid leaks found on reactor coolant system (RCS) piping and
components and one to three corrective actions performed for identified boric acid
components and one to three corrective actions performed for identified boric acid
leaks.  The licensee had identified a boric acid leak on the containment spray header
leaks.  The licensee had identified a boric acid leak on the containment spray header
during an inspection for materials that could come loose and clog the sump screens
during an inspection for materials that could come loose and clog the sump screens
during a loss-of-coolant accident or steam line rupture inside containment.  The
during a loss-of-coolant accident or steam line rupture inside containment.  The
inspectors reviewed the licensee's analysis of the condition to evaluate the assessment
inspectors reviewed the licensees analysis of the condition to evaluate the assessment
of the condition and proposed corrective actions.The inspectors completed the one sample required by Section 02.03..4Steam Generator Tube Inspection ActivitiesThere were no steam generator tube inspections performed during this outage.  Theinspectors reviewed Evaluation ER-2005-0469-001, "Operational Assessment of ANO-2
of the condition and proposed corrective actions.
Steam Generator Tubing for Cycles 18-20," dated August 31, 2006.  The evaluation
The inspectors completed the one sample required by Section 02.03.
.4
Steam Generator Tube Inspection Activities
There were no steam generator tube inspections performed during this outage.  The
inspectors reviewed Evaluation ER-2005-0469-001, Operational Assessment of ANO-2
Steam Generator Tubing for Cycles 18-20, dated August 31, 2006.  The evaluation
concluded that no tube examinations were required to be performed during
concluded that no tube examinations were required to be performed during
Cycles 18-20.  The inspectors noted that the basis was the condition of the tubes from
Cycles 18-20.  The inspectors noted that the basis was the condition of the tubes from
the previous inspections that were performed after the steam generators were replaced.This sample was not completed because there was no activity to observe.  
the previous inspections that were performed after the steam generators were replaced.
-13-Enclosure.5Identification and Resolution of ProblemsThe inspection procedure requires review of a sample of problems associated withinservice inspections documented by the licensee in the CAP for appropriateness of the
This sample was not completed because there was no activity to observe.
 
-13-
Enclosure
.5
Identification and Resolution of Problems
The inspection procedure requires review of a sample of problems associated with
inservice inspections documented by the licensee in the CAP for appropriateness of the
corrective actions.  The inspectors reviewed three CRs, which dealt with inservice
corrective actions.  The inspectors reviewed three CRs, which dealt with inservice
inspection and welding activities.  From this review, the inspectors concluded that the
inspection and welding activities.  From this review, the inspectors concluded that the
licensee has an appropriate threshold for entering issues into the CAP and has
licensee has an appropriate threshold for entering issues into the CAP and has
procedures that direct a root cause evaluation when necessary.  The licensee also had
procedures that direct a root cause evaluation when necessary.  The licensee also had
an effective program for applying industry operating experience.     b.FindingsNo findings of significance were identified.1R11Licensed Operator Requalification Program (71111.11)     a.Inspection ScopeOn December 14, 2006, the inspectors observed testing and training of Unit 1 seniorreactor operators and reactor operators to identify deficiencies and discrepancies in the
an effective program for applying industry operating experience.
    b.
Findings
No findings of significance were identified.
1R11
Licensed Operator Requalification Program (71111.11)
    a.
Inspection Scope
On December 14, 2006, the inspectors observed testing and training of Unit 1 senior
reactor operators and reactor operators to identify deficiencies and discrepancies in the
training, to assess operator performance, and to assess the evaluator's critique.  The
training, to assess operator performance, and to assess the evaluator's critique.  The
training was a simulator training scenario.Documents reviewed by the inspectors included:
training was a simulator training scenario.
*ANO Unit 1 Dynamic Exam Scenario SES-1-008, Revision 5
Documents reviewed by the inspectors included:
The inspectors completed one sample.     b.FindingsNo findings of significance were identified.1R12Maintenance Effectiveness (71111.12)     a.Inspection ScopeThe inspectors reviewed the two below listed maintenance activities to:  (1) verify theappropriate handling of SSCs performance or condition problems; (2) verify the
*
ANO Unit 1 Dynamic Exam Scenario SES-1-008, Revision 5
The inspectors completed one sample.
    b.
Findings
No findings of significance were identified.
1R12
Maintenance Effectiveness (71111.12)
    a.
Inspection Scope
The inspectors reviewed the two below listed maintenance activities to:  (1) verify the
appropriate handling of SSCs performance or condition problems; (2) verify the
appropriate handling of degraded SSC functional performance; (3) evaluate the role of
appropriate handling of degraded SSC functional performance; (3) evaluate the role of
work practices and common cause problems; and (4) evaluate the handling of SSC
work practices and common cause problems; and (4) evaluate the handling of SSC
issues reviewed under the requirements of the Maintenance Rule, 10 CFR Part 50,
issues reviewed under the requirements of the Maintenance Rule, 10 CFR Part 50,
Appendix B, and TSs. *November 28, 2006, Unit 1, turbine building ventilation*December 5, 2006, Unit 2, 480-volt electrical distributionDocuments reviewed by the inspectors are listed in the attachment.
Appendix B, and TSs.  
-14-EnclosureThe inspectors completed two samples.     b.FindingsNo findings of significance were identified.1R13Maintenance Risk Assessments and Emergent Work Control (71111.13).1Risk Assessment and Management of Risk     a.Inspection ScopeRisk Assessment and Management of RiskThe inspectors reviewed the six below listed assessment activities to verify: (1) performance of risk assessments when required by 10 CFR 50.65 (a)(4) and
*
November 28, 2006, Unit 1, turbine building ventilation
*
December 5, 2006, Unit 2, 480-volt electrical distribution
Documents reviewed by the inspectors are listed in the attachment.  
 
-14-
Enclosure
The inspectors completed two samples.
    b.
Findings
No findings of significance were identified.
1R13
Maintenance Risk Assessments and Emergent Work Control (71111.13)
.1
Risk Assessment and Management of Risk
    a.
Inspection Scope
Risk Assessment and Management of Risk
The inspectors reviewed the six below listed assessment activities to verify:  
(1) performance of risk assessments when required by 10 CFR 50.65 (a)(4) and
licensee procedures prior to changes in plant configuration for maintenance activities
licensee procedures prior to changes in plant configuration for maintenance activities
and plant operations; (2) the accuracy, adequacy, and completeness of the information
and plant operations; (2) the accuracy, adequacy, and completeness of the information
Line 368: Line 786:
applicable, the appropriate licensee-established risk category according to the risk
applicable, the appropriate licensee-established risk category according to the risk
assessment results and licensee procedures; and (4) that the licensee identified and
assessment results and licensee procedures; and (4) that the licensee identified and
corrected problems related to maintenance risk assessments.*September 19 through October 27, 2006, Unit 2, pressurizer replacement
corrected problems related to maintenance risk assessments.
*September 19 through October 27, 2006, Unit 2, containment sump modification
*
*November 13-17, 2006, Unit 1, planned maintenance for the week
September 19 through October 27, 2006, Unit 2, pressurizer replacement
*November 27 through December 1, 2006, Unit 1, planned maintenance for theweek*December 4-8, 2006, Unit 2, planned maintenance for the week
*
*December 11-15, 2006, Unit 1, planned maintenance for the week
September 19 through October 27, 2006, Unit 2, containment sump modification
*
November 13-17, 2006, Unit 1, planned maintenance for the week
*
November 27 through December 1, 2006, Unit 1, planned maintenance for the
week
*
December 4-8, 2006, Unit 2, planned maintenance for the week
*
December 11-15, 2006, Unit 1, planned maintenance for the week
Documents reviewed by the inspectors are listed in the attachment.
Documents reviewed by the inspectors are listed in the attachment.
The inspectors completed six samples.     b.FindingsNo findings of significance were identified.  
The inspectors completed six samples.
-15-Enclosure1R15Operability Evaluations (71111.15)     a.Inspection ScopeThe inspectors:  (1) reviewed plants status documents, such as operator shift logs,emergent work documentation, deferred modifications, and standing orders, to
    b.
Findings
No findings of significance were identified.
 
-15-
Enclosure
1R15
Operability Evaluations (71111.15)
    a.
Inspection Scope
The inspectors:  (1) reviewed plants status documents, such as operator shift logs,
emergent work documentation, deferred modifications, and standing orders, to
determine if an operability evaluation was warranted for degraded components;
determine if an operability evaluation was warranted for degraded components;
(2) referred to the UFSAR and design basis documents to review the technical
(2) referred to the UFSAR and design basis documents to review the technical
Line 383: Line 821:
significance of degraded or inoperable equipment; and (6) verified that the licensee has
significance of degraded or inoperable equipment; and (6) verified that the licensee has
identified and implemented appropriate corrective actions associated with degraded
identified and implemented appropriate corrective actions associated with degraded
components.*September 22, 2006, Unit 2, reactor coolant pump (RCP) oil collection system*October 3, 2006, Unit 2, Electrical Bus 2B-5
components.
*October 28, 2006, Unit 2, containment spray header
*
*December 19, 2006, Unit 2, containment sumpDocuments reviewed by the inspectors are listed in the attachment.
September 22, 2006, Unit 2, reactor coolant pump (RCP) oil collection system
The inspectors completed four samples.     b.FindingsIntroduction.  A Green self-revealing noncited violation of the Unit 2 license condition forfire protection was identified for failure of the licensee to maintain the RCP oil collection
*
October 3, 2006, Unit 2, Electrical Bus 2B-5
*
October 28, 2006, Unit 2, containment spray header
*
December 19, 2006, Unit 2, containment sump
Documents reviewed by the inspectors are listed in the attachment.
The inspectors completed four samples.
    b.
Findings
Introduction.  A Green self-revealing noncited violation of the Unit 2 license condition for
fire protection was identified for failure of the licensee to maintain the RCP oil collection
system for RCPs C and D in an operable condition.  Specifically, the licensee failed to
system for RCPs C and D in an operable condition.  Specifically, the licensee failed to
perform a modification on the motor installed on RCP C, which resulted in the oil
perform a modification on the motor installed on RCP C, which resulted in the oil
collection tank and its associated overfill berm filling up and overflowing with water from
collection tank and its associated overfill berm filling up and overflowing with water from
the component cooling water (CCW) system. Description.  On September 20, 2006, while the licensee was conducting a hotshutdown walkdown in containment during the start of Refueling Outage 2R18, the
the component cooling water (CCW) system.  
Description.  On September 20, 2006, while the licensee was conducting a hot
shutdown walkdown in containment during the start of Refueling Outage 2R18, the
licensee discovered that the RCP oil collection system drain tank for RCPs C and D,
licensee discovered that the RCP oil collection system drain tank for RCPs C and D,
(2T-110) and its associated overfill berm were filled and overflowing with water.  The
(2T-110) and its associated overfill berm were filled and overflowing with water.  The
licensee determined that the drain tank and associated berm were inoperable because
licensee determined that the drain tank and associated berm were inoperable because
the licensee could not perform their intended function of providing a collection and
the licensee could not perform their intended function of providing a collection and
holding point for possible oil leakage from RCPs C and D.  The licensee obtained a sample of the water and determined that it was from the CCWsystem.  Based on this, the licensee then identified and performed inspections of all
holding point for possible oil leakage from RCPs C and D.   
The licensee obtained a sample of the water and determined that it was from the CCW
system.  Based on this, the licensee then identified and performed inspections of all
interface points of the CCW system with the RCP oil collection system.  During this
interface points of the CCW system with the RCP oil collection system.  During this
inspection, two leakage points were identified:  the outlet flange of lube oil
inspection, two leakage points were identified:  the outlet flange of lube oil
Cooler 2E-25D, and the interface of the threaded supply and return piping nipples forthe lower bearing oil cooler on RCP C.  The leakage from the lower bearing oil cooler
Cooler 2E-25D, and the interface of the threaded supply and return piping nipples for
the lower bearing oil cooler on RCP C.  The leakage from the lower bearing oil cooler
was determined to be the source that was leaking into the oil collection system through
was determined to be the source that was leaking into the oil collection system through
the drip pans below the motor.  
the drip pans below the motor.
-16-EnclosureDuring their investigation to determine the cause of this failure, the licensee identifiedthe cause of the leakage to be fatigue at the root diameter of the threaded schedule
 
-16-
Enclosure
During their investigation to determine the cause of this failure, the licensee identified
the cause of the leakage to be fatigue at the root diameter of the threaded schedule
40 pipe nipple.  They also determined that this type of failure had previously occurred on
40 pipe nipple.  They also determined that this type of failure had previously occurred on
the motor installed on RCP B in December of 1995.  This failure was documented in
the motor installed on RCP B in December of 1995.  This failure was documented in
Line 413: Line 871:
refurbishment; however, the modification was never performed.  In 2005 during
refurbishment; however, the modification was never performed.  In 2005 during
Refueling Outage 2R17, the spare RCP motor was installed as the RPC C motor without
Refueling Outage 2R17, the spare RCP motor was installed as the RPC C motor without
the modification.In reviewing this issue, the inspectors noted that the licensee had trend data for thevolume of oil in RCPs C and D which indicated that oil volume in RCPs C and D had
the modification.
In reviewing this issue, the inspectors noted that the licensee had trend data for the
volume of oil in RCPs C and D which indicated that oil volume in RCPs C and D had
gone down over the cycle.  The inspectors determined through interviews that this oil
gone down over the cycle.  The inspectors determined through interviews that this oil
was not contained in the oil collection system or the overflow berm as per design but
was not contained in the oil collection system or the overflow berm as per design but
had most likely overflowed the berm and gone to the containment sump via the floor
had most likely overflowed the berm and gone to the containment sump via the floor
drain system.  During the operating cycle, the sump had been pumped to the auxiliary
drain system.  During the operating cycle, the sump had been pumped to the auxiliary
building for processing.Analysis.  The inspectors determined that the failure to maintain the oil collection systemdrain tank for RCPs C and D in an operable condition was a performance deficiency.  
building for processing.
Analysis.  The inspectors determined that the failure to maintain the oil collection system
drain tank for RCPs C and D in an operable condition was a performance deficiency.  
The finding was determined to be more than minor because it affected the protection
The finding was determined to be more than minor because it affected the protection
against external factors attribute of the mitigating systems cornerstone objective to
against external factors attribute of the mitigating systems cornerstone objective to
ensure the availability, reliability, and capability of systems that respond to initiating
ensure the availability, reliability, and capability of systems that respond to initiating
events to prevent undesirable consequences.  Using MC 0609, "Significance
events to prevent undesirable consequences.  Using MC 0609, Significance
Determination Process," Phase 1 Worksheet, the finding is assumed to degrade fire
Determination Process, Phase 1 Worksheet, the finding is assumed to degrade fire
protection defense-in-depth strategies involving barriers; therefore, the significance of
protection defense-in-depth strategies involving barriers; therefore, the significance of
the finding is determined by using Appendix F, "Fire Protection Significance
the finding is determined by using Appendix F, Fire Protection Significance
Determination Process," of MC 0609.  Using the Phase 1 Worksheet of Appendix F, the
Determination Process, of MC 0609.  Using the Phase 1 Worksheet of Appendix F, the
inspectors assumed the condition represented a low degradation of the fire prevention
inspectors assumed the condition represented a low degradation of the fire prevention
and administrative controls category since the oil collection would have kept oil from
and administrative controls category since the oil collection would have kept oil from
Line 433: Line 895:
adjacent fire areas and that the containment sump, to which the floor drains installed in
adjacent fire areas and that the containment sump, to which the floor drains installed in
the area of the berm transported any oil that overflowed, lacked a significant ignition
the area of the berm transported any oil that overflowed, lacked a significant ignition
source.
Enforcement.  ANO Unit 2 License Condition 2.C.(3)(b), Fire Protection, states, in part,
that the licensee shall implement and maintain all provisions of the approved fire
protection program.  ANO Unit 1 and Unit 2 - Fire Hazards Analysis, Revision 9, is part
of the ANO Unit 2 fire protection program.  Section 6.4.5, Fire Barriers, Seals, and
Penetrations, of the Fire Hazards Analysis states, in part, that the fire barrier system at
ANO has been designed to ensure that fires will be confined or adequately retarded
from spreading to adjacent portions of the facility.  Contrary to this, the filling to overflow
of the oil collection system tank and overflow berm with water from the CCW system


source.Enforcement.  ANO Unit 2 License Condition 2.C.(3)(b), "Fire Protection," states, in part,that the licensee shall implement and maintain all provisions of the approved fire
-17-
protection program.  "ANO Unit 1 and Unit 2 - Fire Hazards Analysis," Revision 9, is part
Enclosure
of the ANO Unit 2 fire protection program.  Section 6.4.5, "Fire Barriers, Seals, and
during Operating Cycle 18 prevented a potential RCP oil fire in the containment
Penetrations," of the Fire Hazards Analysis states, in part, that the fire barrier system at
basement from being confined per the fire protection program.  Because the finding is of
ANO has been designed to ensure that fires will be confined or adequately retarded
very low safety significance and has been entered into the licensees CAP as
from spreading to adjacent portions of the facility.  Contrary to this, the filling to overflowof the oil collection system tank and overflow berm with water from the CCW system
-17-Enclosureduring Operating Cycle 18 prevented a potential RCP oil fire in the containmentbasement from being confined per the fire protection program.  Because the finding is of
very low safety significance and has been entered into the licensee's CAP as
CR ANO-2-2006-1407, this violation is being treated as an NCV consistent with
CR ANO-2-2006-1407, this violation is being treated as an NCV consistent with
Section VIA of the Enforcement Policy:  NCV 05000368/2006005-02, "Failure to Perform
Section VIA of the Enforcement Policy:  NCV 05000368/2006005-02, Failure to Perform
Modification Resulted in an Inoperable RCP Oil Collection System."1R17Permanent Plant Modifications (71111.17).1Annual ReviewThe inspectors reviewed key affected parameters associated with energy needs,materials/replacement components, timing, heat removal, control signals, equipment
Modification Resulted in an Inoperable RCP Oil Collection System.
1R17
Permanent Plant Modifications (71111.17)
.1
Annual Review
The inspectors reviewed key affected parameters associated with energy needs,
materials/replacement components, timing, heat removal, control signals, equipment
protection from hazards, operations, flowpaths, pressure boundary, ventilation
protection from hazards, operations, flowpaths, pressure boundary, ventilation
boundary, structural, process medium properties, licensing basis, and failure modes for
boundary, structural, process medium properties, licensing basis, and failure modes for
Line 455: Line 929:
assumptions, and the modification test acceptance criteria has been met; and (3) the
assumptions, and the modification test acceptance criteria has been met; and (3) the
licensee has identified and implemented appropriate corrective actions associated with
licensee has identified and implemented appropriate corrective actions associated with
permanent plant modifications. *September 19 through October 26, 2006, Unit 2, pressurizer replacement1R19Postmaintenance Testing (71111.19)     a.Inspection ScopeThe inspectors selected the six below listed postmaintenance test activities of risksignificant systems or components.  For each item, the inspectors:  (1) reviewed the
permanent plant modifications.  
*
September 19 through October 26, 2006, Unit 2, pressurizer replacement
1R19
Postmaintenance Testing (71111.19)
    a.
Inspection Scope
The inspectors selected the six below listed postmaintenance test activities of risk
significant systems or components.  For each item, the inspectors:  (1) reviewed the
applicable licensing basis and/or design-basis documents to determine the safety
applicable licensing basis and/or design-basis documents to determine the safety
functions; (2) evaluated the safety functions that may have been affected by the
functions; (2) evaluated the safety functions that may have been affected by the
Line 465: Line 947:
equipment was removed, the system was properly realigned, and deficiencies during
equipment was removed, the system was properly realigned, and deficiencies during
testing were documented.  The inspectors also reviewed the UFSAR to determine if the
testing were documented.  The inspectors also reviewed the UFSAR to determine if the
licensee identified and corrected problems related to postmaintenance testing.*October 17, 2006, Unit 1, Emergency Feedwater Pump P-7A
licensee identified and corrected problems related to postmaintenance testing.
*October 22, 2006, Unit 2, pressurizer heater capacity  
*
*October 24, 2006, Unit 2, replacement pressurizer relief valve monitor test
October 17, 2006, Unit 1, Emergency Feedwater Pump P-7A
-18-Enclosure*October 25, 2006, Unit 2, containment spray header repairs *October 27, 2006, Unit 2, replacement pressurizer leakage
*
*November 1, 2006, Unit 2, containment building personnel hatch leakage rate
October 22, 2006, Unit 2, pressurizer heater capacity  
testingDocuments reviewed by the inspectors are listed in the attachment.  
*
The inspectors completed six samples.     b.FindingsNo findings of significance were identified.1R20Refueling and Outage Activities (71111.20)1.Unit 2 Forced Outage Caused by Fire in Motor Control Center 2B-53     a.Inspection ScopeThe inspectors reviewed the following risk significant outage activities to verify defensein depth commensurate with the outage risk control plan and compliance with the TSs:  
October 24, 2006, Unit 2, replacement pressurizer relief valve monitor test  
 
-18-
Enclosure
*
October 25, 2006, Unit 2, containment spray header repairs  
*
October 27, 2006, Unit 2, replacement pressurizer leakage
*
November 1, 2006, Unit 2, containment building personnel hatch leakage rate
testing
Documents reviewed by the inspectors are listed in the attachment.  
The inspectors completed six samples.
    b.
Findings
No findings of significance were identified.
1R20
Refueling and Outage Activities (71111.20)
1.
Unit 2 Forced Outage Caused by Fire in Motor Control Center 2B-53
    a.
Inspection Scope
The inspectors reviewed the following risk significant outage activities to verify defense
in depth commensurate with the outage risk control plan and compliance with the TSs:  
(1) the risk control plan, (2) tagging/clearance activities,  (3) heatup and cooldown
(1) the risk control plan, (2) tagging/clearance activities,  (3) heatup and cooldown
activities, and (4) restart activities. The inspectors completed one sample.     b.FindingsNo findings of significance were identified.2.Refueling and Pressurizer Replacement Outage 2R18     a.Inspection ScopeThe inspectors reviewed the following risk significant refueling items or outage activitiesto verify defense in depth commensurate with the outage risk control plan, compliance
activities, and (4) restart activities.  
with the TSs, and adherence to commitments in response to Generic Letter 88-17, "Loss
The inspectors completed one sample.
of Decay Heat Removal":  (1) the risk control plan, (2) tagging/clearance activities,
    b.
Findings
No findings of significance were identified.
2.
Refueling and Pressurizer Replacement Outage 2R18
    a.
Inspection Scope
The inspectors reviewed the following risk significant refueling items or outage activities
to verify defense in depth commensurate with the outage risk control plan, compliance
with the TSs, and adherence to commitments in response to Generic Letter 88-17, Loss
of Decay Heat Removal:  (1) the risk control plan, (2) tagging/clearance activities,
(3) RCS instrumentation, (4) electrical power, (5) decay heat removal, (6) spent fuel pool
(3) RCS instrumentation, (4) electrical power, (5) decay heat removal, (6) spent fuel pool
cooling, (7) inventory control, (8) reactivity control, (9) containment closure, (10) reduced
cooling, (7) inventory control, (8) reactivity control, (9) containment closure, (10) reduced
inventory conditions, (11) refueling activities, (12) heatup and cooldown activities,
inventory conditions, (11) refueling activities, (12) heatup and cooldown activities,
(13) restart activities, and (14) licensee identification and implementation of appropriate
(13) restart activities, and (14) licensee identification and implementation of appropriate
corrective actions associated with refueling and outage activities.  The inspectors'
corrective actions associated with refueling and outage activities.  The inspectors
containment inspections included observation of the containment sump for damage and
containment inspections included observation of the containment sump for damage and
debris, supports, braces, and snubbers for evidence of excessive stress, water hammer,
debris, supports, braces, and snubbers for evidence of excessive stress, water hammer,
or aging.  
or aging.
-19-EnclosureThe inspectors completed one sample.     b.Findings.1Inadvertent RCS Draining While in Mode 5Introduction.  A Green self-revealing noncited violation of the licensee's TS requirementfor procedures was identified when an operator failed to close a resin sluice header
 
-19-
Enclosure
The inspectors completed one sample.
    b.
Findings
.1
Inadvertent RCS Draining While in Mode 5
Introduction.  A Green self-revealing noncited violation of the licensees TS requirement
for procedures was identified when an operator failed to close a resin sluice header
drain valve as required by procedure.  Later, while operators were aligning the unit for
drain valve as required by procedure.  Later, while operators were aligning the unit for
alternate reactor coolant purification, a loss of approximately 230 gallons of RCS
alternate reactor coolant purification, a loss of approximately 230 gallons of RCS
inventory occurred.  Description.  On September 14, 2006, operations personnel performedProcedure OP-2104.019, "Clean Resin Transfer," to add clean resin to Purification Ion
inventory occurred.   
Description.  On September 14, 2006, operations personnel performed
Procedure OP-2104.019, Clean Resin Transfer, to add clean resin to Purification Ion
Exchanger 2T-36B.  During this procedure, Valve 2DCH-11 was opened as part of the
Exchanger 2T-36B.  During this procedure, Valve 2DCH-11 was opened as part of the
system lineup.  Subsequently, when the evolution was completed and the plant lineup
system lineup.  Subsequently, when the evolution was completed and the plant lineup
was being restored, station personnel failed to properly perform Step 22.2 of the
was being restored, station personnel failed to properly perform Step 22.2 of the
procedure leaving Valve 2DCH-11 in the open position.  Subsequently, on September 21, 2006, with Unit 2 in Mode 5, the licensee was in theprocess of aligning alternate purification in accordance with Procedure OP-2104.004,
procedure leaving Valve 2DCH-11 in the open position.   
"Shutdown Cooling System," Attachment J, "Alternate Purification." When Step 2.11 of
Subsequently, on September 21, 2006, with Unit 2 in Mode 5, the licensee was in the
process of aligning alternate purification in accordance with Procedure OP-2104.004,
Shutdown Cooling System, Attachment J, Alternate Purification.  When Step 2.11 of
this procedure was performed, the control room operators noted that pressurizer level
this procedure was performed, the control room operators noted that pressurizer level
began to lower.  The evolution was stopped and the lineup was secured.  At this point,
began to lower.  The evolution was stopped and the lineup was secured.  At this point,
Line 498: Line 1,026:
and discovered that Valve 2DCH-11 was in the open position.  Operations personnel
and discovered that Valve 2DCH-11 was in the open position.  Operations personnel
determined that approximately 230 gallons were drained from the RCS through the open
determined that approximately 230 gallons were drained from the RCS through the open
valve.During their review, the inspectors noted that Procedure OP-2104.004, Attachment J,directed personnel to prepare a caution tag for components to prevent the loss of RCS
valve.
During their review, the inspectors noted that Procedure OP-2104.004, Attachment J,
directed personnel to prepare a caution tag for components to prevent the loss of RCS
inventory.  However, the procedure contained a note that preceded Step 1.11 which
inventory.  However, the procedure contained a note that preceded Step 1.11 which
directed the caution tag be hung on the room door instead of Valve 2DCH-11 and two
directed the caution tag be hung on the room door instead of Valve 2DCH-11 and two
Line 505: Line 1,035:
that this note contributed to Valve 2DCH-11 not being discovered out of position prior to
that this note contributed to Valve 2DCH-11 not being discovered out of position prior to
initiating alternate purification since the licensee did not perform a valve lineup
initiating alternate purification since the licensee did not perform a valve lineup
verification.Analysis.  The failure of station personnel to manipulate Valve 2DCH-11 in accordancewith station procedure was determined to be a performance deficiency.  The finding was
verification.
Analysis.  The failure of station personnel to manipulate Valve 2DCH-11 in accordance
with station procedure was determined to be a performance deficiency.  The finding was
determined to be more than minor because it affected the configuration control attribute
determined to be more than minor because it affected the configuration control attribute
of the initiating events cornerstone objective to limit the likelihood of those events that
of the initiating events cornerstone objective to limit the likelihood of those events that
upset plant stability and challenge critical safety functions during shutdown as well as
upset plant stability and challenge critical safety functions during shutdown as well as
power operations.  The inspectors used MC 0609, "Significance Determination Process,"
power operations.  The inspectors used MC 0609, Significance Determination Process,
Appendix G, "Shutdown Operations Significance Determination Process," and assumed
Appendix G, Shutdown Operations Significance Determination Process, and assumed
that the administrative controls implemented to avoid operations that could lead to
that the administrative controls implemented to avoid operations that could lead to
perturbations in RCS level control attribute was affected.  The finding was determined to
perturbations in RCS level control attribute was affected.  The finding was determined to
have very low safety significance because the finding did not result in a loss of 2 feet or  
have very low safety significance because the finding did not result in a loss of 2 feet or
-20-Enclosuremore of RCS inventory and did not result in a loss of RCS inventory while the unit was inreduced inventory.  The cause of the finding is related to the crosscutting aspect ofhuman performance associated with work practices because the operator failed to use
 
-20-
Enclosure
more of RCS inventory and did not result in a loss of RCS inventory while the unit was in
reduced inventory.  The cause of the finding is related to the crosscutting aspect of
human performance associated with work practices because the operator failed to use
error prevention techniques like self checking and peer checking which would have
error prevention techniques like self checking and peer checking which would have
prevented the event.Enforcement.  Unit 2 TS, Section 6.4.1.a, "Procedures," requires, in part, that writtenprocedures shall be established, implemented, and maintained covering the applicable
prevented the event.
Enforcement.  Unit 2 TS, Section 6.4.1.a, Procedures, requires, in part, that written
procedures shall be established, implemented, and maintained covering the applicable
procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A,
procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A,
February 1978.  Procedure OP-2104.019, "Clean Resin Transfer," is a procedure
February 1978.  Procedure OP-2104.019, Clean Resin Transfer, is a procedure
required by Regulatory Guide 1.33.  Contrary to the above, on September 14, 2006, the
required by Regulatory Guide 1.33.  Contrary to the above, on September 14, 2006, the
licensee failed to fully implement Procedure OP-2104.019, "Clean Resin Transfer,"
licensee failed to fully implement Procedure OP-2104.019, Clean Resin Transfer,
when the licensee failed to close Valve 2DCH-11.  Because this finding is of very low
when the licensee failed to close Valve 2DCH-11.  Because this finding is of very low
safety significance and has been entered into the CAP as CR ANO-2-2006-1464, this
safety significance and has been entered into the CAP as CR ANO-2-2006-1464, this
violation is being treated as an NCV, consistent with Section VIA of the NRC
violation is being treated as an NCV, consistent with Section VIA of the NRC
Enforcement Policy:  NCV 05000368/2006005-03, "Inadvertent RCS Draining While in
Enforcement Policy:  NCV 05000368/2006005-03, Inadvertent RCS Draining While in
Mode 5.".2Unplanned Increase in Time with Reactor Vessel Water Level at Flange LevelIntroduction.  A Green self-revealing finding was identified associated with the licensee'suse of a hammer to remove and reinstall both the main hook pin and the load cell pin on
Mode 5.
.2
Unplanned Increase in Time with Reactor Vessel Water Level at Flange Level
Introduction.  A Green self-revealing finding was identified associated with the licensees
use of a hammer to remove and reinstall both the main hook pin and the load cell pin on
the Unit 2 polar crane.  Unit 2 was maintained in a condition with reactor vessel water
the Unit 2 polar crane.  Unit 2 was maintained in a condition with reactor vessel water
level being maintained just below the reactor vessel flange for an additional unplanned
level being maintained just below the reactor vessel flange for an additional unplanned
27 hours when the pins could not be used due to deformation by the hammer. Description.  On September 24, 2006, station personnel were preparing the Unit 2 polarcrane for the reactor vessel closure head removal.  This involved removing the normally
27 hours when the pins could not be used due to deformation by the hammer.  
Description.  On September 24, 2006, station personnel were preparing the Unit 2 polar
crane for the reactor vessel closure head removal.  This involved removing the normally
installed main hook, installing a load cell, and then reinstalling the main hook.  During
installed main hook, installing a load cell, and then reinstalling the main hook.  During
performance of Procedure OP-2504.005, "Reactor Vessel Closure Head Removal,"
performance of Procedure OP-2504.005, Reactor Vessel Closure Head Removal,
Revision 12, Step 7.22, licensee personnel were unable to easily remove the polar crane
Revision 12, Step 7.22, licensee personnel were unable to easily remove the polar crane
main hook pin.  After the pin was removed, it was examined by the licensee and
main hook pin.  After the pin was removed, it was examined by the licensee and
Line 536: Line 1,081:
secure the load cell into place, it was discovered to be in the same condition.  The
secure the load cell into place, it was discovered to be in the same condition.  The
licensee determined this condition to be caused by the practice of using a hammer, as
licensee determined this condition to be caused by the practice of using a hammer, as
necessary, to both remove and install the pins during previous refueling outages. The inspectors noted that the licensee did not have a formal procedure that controlledthe removal and installation of the pins, and that station personnel were controlling this
necessary, to both remove and install the pins during previous refueling outages.  
The inspectors noted that the licensee did not have a formal procedure that controlled
the removal and installation of the pins, and that station personnel were controlling this
evolution as a skill-of-the-craft process.  A review of the applicable procedures by the
evolution as a skill-of-the-craft process.  A review of the applicable procedures by the
inspectors revealed that Procedure OP-2504.005, Step 7.22, "Reactor Vessel Closure
inspectors revealed that Procedure OP-2504.005, Step 7.22, Reactor Vessel Closure
Head Removal," simply states, "Verify that the load cell is attached to the polar crane."
Head Removal, simply states, Verify that the load cell is attached to the polar crane.  
The inspectors also determined that the use of hammers was a common practice being
The inspectors also determined that the use of hammers was a common practice being
used to remove and reinstall the pins on the polar crane, and there was no existing
used to remove and reinstall the pins on the polar crane, and there was no existing
Line 545: Line 1,092:
that the lack of adequate procedural direction and the practice of hammering the pins in
that the lack of adequate procedural direction and the practice of hammering the pins in
and out directly contributed to the deformation of the pins.  Finally, the inspectors were
and out directly contributed to the deformation of the pins.  Finally, the inspectors were
informed by licensee personnel that the practice of using hammers to remove the pins  
informed by licensee personnel that the practice of using hammers to remove the pins
-21-Enclosurewas not part of the formal training received by maintenance personnel; however, in atleast one instance, a discussion between instructors and maintenance personnel
 
-21-
Enclosure
was not part of the formal training received by maintenance personnel; however, in at
least one instance, a discussion between instructors and maintenance personnel
outside the formal lesson plan had occurred describing the practice of using hammers
outside the formal lesson plan had occurred describing the practice of using hammers
as being acceptable.Analysis.  The inspectors determined that the licensee's failure to provide clear guidanceand training on how to remove the main hook and load cell pins without causing damage
as being acceptable.
Analysis.  The inspectors determined that the licensees failure to provide clear guidance
and training on how to remove the main hook and load cell pins without causing damage
was a performance deficiency.  The finding was determined to be more than minor
was a performance deficiency.  The finding was determined to be more than minor
because it affected the equipment performance attribute of the initiating events
because it affected the equipment performance attribute of the initiating events
cornerstone objective to limit the likelihood of those events that upset plant stability and
cornerstone objective to limit the likelihood of those events that upset plant stability and
challenge critical safety functions during shutdown as well as power operations.  The
challenge critical safety functions during shutdown as well as power operations.  The
inspectors evaluated the finding using MC 0609, "Significance Determination Process,"
inspectors evaluated the finding using MC 0609, Significance Determination Process,
Appendix G, "Shutdown Operations Significance Determination Process." The
Appendix G, Shutdown Operations Significance Determination Process.  The
inspectors determined that the finding was not a loss of shutdown control as defined by
inspectors determined that the finding was not a loss of shutdown control as defined by
MC 0609, Appendix G, Table 1, and then evaluated the issue using Checklist 3 of
MC 0609, Appendix G, Table 1, and then evaluated the issue using Checklist 3 of
Line 561: Line 1,114:
capability which would have increased the frequency of occurrence of a loss of decay
capability which would have increased the frequency of occurrence of a loss of decay
heat removal.  Therefore, the finding was determined to have very low safety
heat removal.  Therefore, the finding was determined to have very low safety
significance.  The cause of the finding is  
significance.  The cause of the finding is related to the crosscutting element of human
related to the crosscutting element of humanperformance associated with resources because the training of personnel and
performance associated with resources because the training of personnel and
procedural guidance available was adequate.Enforcement.  While a performance deficiency was identified, there were no violations ofNRC requirements identified during the review of this issue.  The licensee has entered
procedural guidance available was adequate.
Enforcement.  While a performance deficiency was identified, there were no violations of
NRC requirements identified during the review of this issue.  The licensee has entered
this issue into the CAP as CR ANO-2-2006-1553:  Finding (FIN) 05000368/2006005-04,
this issue into the CAP as CR ANO-2-2006-1553:  Finding (FIN) 05000368/2006005-04,
"Unplanned Increase in Time with Reactor Vessel Water Level at Flange Level."1R22Surveillance Testing  (71111.22)     a.Inspection ScopeThe inspectors reviewed the UFSAR, procedure requirements, and TSs to ensure thatthe four below listed surveillance activities demonstrated that the SSCs tested were
Unplanned Increase in Time with Reactor Vessel Water Level at Flange Level.
1R22
Surveillance Testing  (71111.22)
    a.
Inspection Scope
The inspectors reviewed the UFSAR, procedure requirements, and TSs to ensure that
the four below listed surveillance activities demonstrated that the SSCs tested were
capable of performing their intended safety functions.  The inspectors either witnessed
capable of performing their intended safety functions.  The inspectors either witnessed
or reviewed test data to verify that the following significant surveillance test attributes
or reviewed test data to verify that the following significant surveillance test attributes
Line 576: Line 1,137:
acceptance criteria were correct; (14) reference setting data; and (15) annunciators and
acceptance criteria were correct; (14) reference setting data; and (15) annunciators and
alarms setpoints.  The inspectors also verified that the licensee identified and
alarms setpoints.  The inspectors also verified that the licensee identified and
implemented any needed corrective actions associated with the surveillance testing. *August 4, 2006, Unit 1, makeup system Valve MU-36A local leak rate test*October 5, 2006, Unit 2, main steam safety valve lifts (inservice test)
implemented any needed corrective actions associated with the surveillance testing.  
*October 15, 2006, Unit 2, Valve 2SV-8271-2 local leak rate test  
*
-22-Enclosure*October 23, 2006, Unit 2, Containment Cooler ADocuments reviewed by the inspectors are listed in the attachment.  
August 4, 2006, Unit 1, makeup system Valve MU-36A local leak rate test
The inspectors completed four samples.     b.FindingsNo findings of significance were identified.
*
Cornerstone:  Emergency Preparedness1EP4Emergency Action Level and Emergency Plan Changes (71114.04)     a.Inspection ScopeThe inspector performed an in-office review of Revision 037-05-0 to Emergency PlanImplementing Procedure OP-1903.010, "Emergency Action Level Classification." The
October 5, 2006, Unit 2, main steam safety valve lifts (inservice test)
*
October 15, 2006, Unit 2, Valve 2SV-8271-2 local leak rate test
 
-22-
Enclosure
*
October 23, 2006, Unit 2, Containment Cooler A
Documents reviewed by the inspectors are listed in the attachment.  
The inspectors completed four samples.
    b.
Findings
No findings of significance were identified.
Cornerstone:  Emergency Preparedness
1EP4
Emergency Action Level and Emergency Plan Changes (71114.04)
    a.
Inspection Scope
The inspector performed an in-office review of Revision 037-05-0 to Emergency Plan
Implementing Procedure OP-1903.010, Emergency Action Level Classification.  The
revision was submitted in October 2006.  The revision corrected emergency plan
revision was submitted in October 2006.  The revision corrected emergency plan
guidance for transient event classification and notification practices at Arkansas Nuclear
guidance for transient event classification and notification practices at Arkansas Nuclear
One and was a corrective action for the NCV 05000313,368/2006003-02, "Failure to
One and was a corrective action for the NCV 05000313,368/2006003-02, Failure to
Meet Immediate Notification Requirements during Transient Events."The revision was compared to the previous revision, to the criteria of NUREG-0654, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and
Meet Immediate Notification Requirements during Transient Events.
Preparedness in Support of Nuclear Power Plants," Revision 1; and NEI 99-01,
The revision was compared to the previous revision, to the criteria of NUREG-0654,  
"Methodology for Development of Emergency Action Levels," Revision 2; and to the
Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and
Preparedness in Support of Nuclear Power Plants, Revision 1; and NEI 99-01,
Methodology for Development of Emergency Action Levels, Revision 2; and to the
standards in 10 CFR 50.47(b) to determine if the revision was adequately conducted
standards in 10 CFR 50.47(b) to determine if the revision was adequately conducted
following the requirements of 10 CFR 50.54(q).  This review was not documented in a
following the requirements of 10 CFR 50.54(q).  This review was not documented in a
safety evaluation report and did not constitute approval of licensee changes, therefore,
safety evaluation report and did not constitute approval of licensee changes, therefore,
the revision is subject to future inspection.The inspector completed one sample during the inspection.     b.FindingsNo findings of significance were identified.1EP6Drill Evaluation (71114.06)     a.Inspection ScopeFor the one below listed simulator-based training evolutions contributing to drill/exerciseperformance, emergency response organization, and PIs, the inspectors:  (1) observed
the revision is subject to future inspection.
the training evolution to identify any weaknesses and deficiencies in classification,notification, and protective action requirements (PAR) development activities;
The inspector completed one sample during the inspection.
(2) compared the identified weaknesses and deficiencies against licensee identified  
    b.
-23-Enclosurefindings to determine whether the licensee is properly identifying failures;and (3) determined whether licensee performance is in accordance with the guidance of
Findings
the NEI 99-02, "Voluntary Submission of Performance Indicator Data," acceptance
No findings of significance were identified.
criteria.*December 7, 2006, Unit 2, simulator-based exercise requiring notice of unusualevent and alert declarationsDocuments reviewed by the inspectors are listed in the attachment.  
1EP6
The inspectors completed one sample.     b.FindingsNo findings of significance were identified.2.RADIATION SAFETYCornerstone:  Occupational Radiation Safety2OS1Access Control To Radiologically Significant Areas (71121.01)     a.Inspection ScopeThis area was inspected to assess the licensee's performance in implementing physicaland administrative controls for airborne radioactivity areas, radiation areas, high
Drill Evaluation (71114.06)
    a.
Inspection Scope
For the one below listed simulator-based training evolutions contributing to drill/exercise
performance, emergency response organization, and PIs, the inspectors:  (1) observed
the training evolution to identify any weaknesses and deficiencies in classification,
notification, and protective action requirements (PAR) development activities;
(2) compared the identified weaknesses and deficiencies against licensee identified
 
-23-
Enclosure
findings to determine whether the licensee is properly identifying failures;
and (3) determined whether licensee performance is in accordance with the guidance of
the NEI 99-02, Voluntary Submission of Performance Indicator Data, acceptance
criteria.
*
December 7, 2006, Unit 2, simulator-based exercise requiring notice of unusual
event and alert declarations
Documents reviewed by the inspectors are listed in the attachment.  
The inspectors completed one sample.
    b.
Findings
No findings of significance were identified.
2.
RADIATION SAFETY
Cornerstone:  Occupational Radiation Safety
2OS1 Access Control To Radiologically Significant Areas (71121.01)
    a.
Inspection Scope
This area was inspected to assess the licensees performance in implementing physical
and administrative controls for airborne radioactivity areas, radiation areas, high
radiation areas, and worker adherence to these controls.  The inspectors used the
radiation areas, and worker adherence to these controls.  The inspectors used the
requirements in 10 CFR Part 20, the TSs, and the licensee's procedures required by
requirements in 10 CFR Part 20, the TSs, and the licensees procedures required by
TSs as criteria for determining compliance.  During the inspection, the inspectors
TSs as criteria for determining compliance.  During the inspection, the inspectors
interviewed the radiation protection manager, radiation protection supervisors, and
interviewed the radiation protection manager, radiation protection supervisors, and
radiation workers.  The inspectors performed independent radiation dose rate
radiation workers.  The inspectors performed independent radiation dose rate
measurements and reviewed the following items:*PI events and associated documentation packages reported by the licensee inthe occupational radiation safety cornerstone *Controls (surveys, posting, and barricades) of radiation, high radiation, orairborne radioactivity areas*Radiation work permits, procedures, engineering controls, and air samplerlocations*Conformity of electronic personal dosimeter alarm set points with surveyindications and plant policy; workers' knowledge of required actions when their
measurements and reviewed the following items:
electronic personnel dosimeter noticeably malfunctions or alarms*Barrier integrity and performance of engineering controls in airborne radioactivityareas*Adequacy of the licensee's internal dose assessment for any actual internalexposure greater than 50 millirem committed effective dose equivalent  
*
-24-Enclosure*Physical and programmatic controls for highly activated or contaminatedmaterials (nonfuel) stored within spent fuel and other storage pools*Self-assessments related to the access control program since the lastinspection; there were no audits, licensee event reports, and special reports
PI events and associated documentation packages reported by the licensee in
documented.*Corrective action documents related to access controls  
the occupational radiation safety cornerstone  
*Licensee actions in cases of repetitive deficiencies or significant individualdeficiencies*Radiation work permit briefings and worker instructions  
*
*Adequacy of radiological controls such as, required surveys, radiation protectionjob coverage, and contamination controls during job performance *Dosimetry placement in high radiation work areas with significant dose rategradients*Changes in licensee procedural controls of high dose rate - high radiation areasand very high radiation areas*Controls for special areas that have the potential to become very high radiationareas during certain plant operations*Posting and locking of entrances to all accessible high dose rate - high radiationareas and very high radiation areas *Radiation worker and radiation protection technician performance with respect toradiation protection work requirements The inspectors completed 21 of the required 21 samples.       b.FindingsNo findings of significance were identified.4.OTHER ACTIVITIES
Controls (surveys, posting, and barricades) of radiation, high radiation, or
4OA1PI Verification (71151).1Occupational Radiation Safety Cornerstone     a.Inspection ScopeThe inspectors reviewed licensee documents from April through September 2006. Thereview included corrective action documentation that identified occurrences in locked high
airborne radioactivity areas
radiation areas (as defined in the licensee's TSs, very high radiation areas (as defined in10 CFR 20.1003), and unplanned personnel exposures (as defined in NEI 99-02).  
*
Additional records reviewed included as low as reasonably achievable records and wholebody counts of selected individual exposures.  The inspectors interviewed licensee  
Radiation work permits, procedures, engineering controls, and air sampler
-25-Enclosurepersonnel that were accountable for collecting and evaluating the PI data.  In addition, theinspector toured plant areas to verify that high radiation, locked high radiation, and very
locations
high radiation areas were properly controlled.
*
  PI definitions and guidance contained inNEI 99-02, "Regulatory Assessment Indicator Guideline," Revision 4, were used to verify
Conformity of electronic personal dosimeter alarm set points with survey
the basis in reporting for each data element.*Occupational Exposure Control Effectiveness
indications and plant policy; workers knowledge of required actions when their
The inspectors completed the required sample (1) in this cornerstone     b.FindingsNo findings of significance were identified..2Public Radiation Safety Cornerstone     a.Inspection ScopeThe inspectors reviewed licensee documents from April through September 2006. Licensee records reviewed included corrective action documentation that identified
electronic personnel dosimeter noticeably malfunctions or alarms
*
Barrier integrity and performance of engineering controls in airborne radioactivity
areas
*
Adequacy of the licensees internal dose assessment for any actual internal
exposure greater than 50 millirem committed effective dose equivalent
 
-24-
Enclosure
*
Physical and programmatic controls for highly activated or contaminated
materials (nonfuel) stored within spent fuel and other storage pools
*
Self-assessments related to the access control program since the last
inspection; there were no audits, licensee event reports, and special reports
documented.
*
Corrective action documents related to access controls  
*
Licensee actions in cases of repetitive deficiencies or significant individual
deficiencies
*
Radiation work permit briefings and worker instructions  
*
Adequacy of radiological controls such as, required surveys, radiation protection
job coverage, and contamination controls during job performance  
*
Dosimetry placement in high radiation work areas with significant dose rate
gradients
*
Changes in licensee procedural controls of high dose rate - high radiation areas
and very high radiation areas
*
Controls for special areas that have the potential to become very high radiation
areas during certain plant operations
*
Posting and locking of entrances to all accessible high dose rate - high radiation
areas and very high radiation areas  
*
Radiation worker and radiation protection technician performance with respect to
radiation protection work requirements  
The inspectors completed 21 of the required 21 samples.
    b.
Findings
No findings of significance were identified.
4.
OTHER ACTIVITIES
4OA1 PI Verification (71151)
.1
Occupational Radiation Safety Cornerstone
    a.
Inspection Scope
The inspectors reviewed licensee documents from April through September 2006. The
review included corrective action documentation that identified occurrences in locked high
radiation areas (as defined in the licensees TSs, very high radiation areas (as defined in
10 CFR 20.1003), and unplanned personnel exposures (as defined in NEI 99-02).  
Additional records reviewed included as low as reasonably achievable records and whole
body counts of selected individual exposures.  The inspectors interviewed licensee
 
-25-
Enclosure
personnel that were accountable for collecting and evaluating the PI data.  In addition, the
inspector toured plant areas to verify that high radiation, locked high radiation, and very
high radiation areas were properly controlled. PI definitions and guidance contained in
NEI 99-02, Regulatory Assessment Indicator Guideline, Revision 4, were used to verify
the basis in reporting for each data element.
*
Occupational Exposure Control Effectiveness
The inspectors completed the required sample (1) in this cornerstone
    b.
Findings
No findings of significance were identified.
.2
Public Radiation Safety Cornerstone
    a.
Inspection Scope
The inspectors reviewed licensee documents from April through September 2006.  
Licensee records reviewed included corrective action documentation that identified
occurrences for liquid or gaseous effluent releases that exceeded PI thresholds and those
occurrences for liquid or gaseous effluent releases that exceeded PI thresholds and those
reported to the NRC.  The inspectors interviewed licensee personnel that were
reported to the NRC.  The inspectors interviewed licensee personnel that were
accountable for collecting and evaluating the PI data.  PI definitions and guidance
accountable for collecting and evaluating the PI data.  PI definitions and guidance
contained in NEI 99-02, "Regulatory Assessment Indicator Guideline," Revision 4, were
contained in NEI 99-02, Regulatory Assessment Indicator Guideline, Revision 4, were
used to verify the basis in reporting for each data element.*Radiological Effluent TS/Offsite Dose Calculation Manual  Radiological EffluentOccurrencesThe inspectors completed the required sample (1) in this cornerstone     b.FindingsNo findings of significance were identified.4OA2Identification and Resolution of Problems (71152).1Routine Review of Identification and Resolution of ProblemsThe inspectors performed a daily screening of items entered into the licensee's CAP. This assessment was accomplished by reviewing CRs and attending corrective action
used to verify the basis in reporting for each data element.
*
Radiological Effluent TS/Offsite Dose Calculation Manual  Radiological Effluent
Occurrences
The inspectors completed the required sample (1) in this cornerstone
    b.
Findings
No findings of significance were identified.
4OA2 Identification and Resolution of Problems (71152)
.1
Routine Review of Identification and Resolution of Problems
The inspectors performed a daily screening of items entered into the licensees CAP.  
This assessment was accomplished by reviewing CRs and attending corrective action
review and work control meetings.  The inspectors:  (1) verified that equipment, human
review and work control meetings.  The inspectors:  (1) verified that equipment, human
performance, and program issues were being identified by the licensee at an appropriate
performance, and program issues were being identified by the licensee at an appropriate
threshold and that the issues were entered into the CAP; (2) verified that corrective
threshold and that the issues were entered into the CAP; (2) verified that corrective
actions were commensurate with the significance of the issue; and (3) identified conditions
actions were commensurate with the significance of the issue; and (3) identified conditions
that might warrant additional follow-up through other baseline inspection procedures..2Selected Issue Follow-up InspectionIn addition to the routine review, the inspectors selected the two below listed issues for amore in-depth review.  The inspectors considered the following during the review of the
that might warrant additional follow-up through other baseline inspection procedures.
licensee's actions:  (1)  complete and accurate identification of the problem in a timely  
.2
-26-Enclosuremanner; (2) evaluation and disposition of operability/reportability issues; (3) considerationof extent of condition, generic implications, common cause, and previous occurrences;
Selected Issue Follow-up Inspection
In addition to the routine review, the inspectors selected the two below listed issues for a
more in-depth review.  The inspectors considered the following during the review of the
licensees actions:  (1)  complete and accurate identification of the problem in a timely
 
-26-
Enclosure
manner; (2) evaluation and disposition of operability/reportability issues; (3) consideration
of extent of condition, generic implications, common cause, and previous occurrences;
(4) classification and prioritization of the resolution of the problem; (5) identification of root
(4) classification and prioritization of the resolution of the problem; (5) identification of root
and contributing causes of the problem; (6) identification of corrective actions;
and contributing causes of the problem; (6) identification of corrective actions;
and (7) completion of corrective actions in a timely manner.*September 20, 2006, Unit 2, repeat occurrence of containment purge isolation
and (7) completion of corrective actions in a timely manner.
*October 30, 2006, Unit 2, repeat occurrence of improper electrical connections inmotor-control centersWhen evaluating the effectiveness of the licensee's corrective actions for these issues,the following attributes were considered:*Complete and accurate identification of the problem in a timely mannercommensurate with its significance and ease of discovery*Evaluation and disposition of operability and reportability issues
*
*Consideration of extent of condition, generic implications, common cause, andprevious occurrences*Classification and prioritization of the resolution of the problem commensurate withits safety significance*Identification of root and contributing causes of the problem for significantconditions adverse to quality*Identification of corrective actions which are appropriately focused to correct theproblem*Completion of corrective actions in a timely manner commensurate with the safetysignificance of the issueDocuments reviewed by the inspectors are listed in the attachment.3Semiannual Trend Review     a.Inspection ScopeThe inspectors completed a semi-annual trend review of repetitive or closely relatedissues that were documented in corrective action documents to identify trends that might
September 20, 2006, Unit 2, repeat occurrence of containment purge isolation
*
October 30, 2006, Unit 2, repeat occurrence of improper electrical connections in
motor-control centers
When evaluating the effectiveness of the licensees corrective actions for these issues,
the following attributes were considered:
*
Complete and accurate identification of the problem in a timely manner
commensurate with its significance and ease of discovery
*
Evaluation and disposition of operability and reportability issues
*
Consideration of extent of condition, generic implications, common cause, and
previous occurrences
*
Classification and prioritization of the resolution of the problem commensurate with
its safety significance
*
Identification of root and contributing causes of the problem for significant
conditions adverse to quality
*
Identification of corrective actions which are appropriately focused to correct the
problem
*
Completion of corrective actions in a timely manner commensurate with the safety
significance of the issue
Documents reviewed by the inspectors are listed in the attachment
.3
Semiannual Trend Review
    a.
Inspection Scope
The inspectors completed a semi-annual trend review of repetitive or closely related
issues that were documented in corrective action documents to identify trends that might
indicate the existence of more safety-significant issues.  The inspectors' review consisted
indicate the existence of more safety-significant issues.  The inspectors' review consisted
of the 6-month period of June 24 through December 31, 2006.  When warranted, some of
of the 6-month period of June 24 through December 31, 2006.  When warranted, some of
Line 638: Line 1,380:
reviewed CAP items associated with deficiencies in the conduct of activities involving hot
reviewed CAP items associated with deficiencies in the conduct of activities involving hot
work.  The inspectors compared and contrasted their results with the results contained in
work.  The inspectors compared and contrasted their results with the results contained in
the licensee's quarterly trend reports.  Corrective actions associated with a sample of the
the licensees quarterly trend reports.  Corrective actions associated with a sample of the
issues identified in the licensee's trend report were reviewed for adequacy.  Documents
issues identified in the licensees trend report were reviewed for adequacy.  Documents
reviewed by the inspectors are listed in the attachment.  
reviewed by the inspectors are listed in the attachment.
-27-Enclosure     b.FindingsDuring the Unit 2 pressurizer replacement Refueling Outage 2R18 from September 19through October 28, 2006, several deficiencies were noted involving the conduct of hot
 
work.  Licensee Procedure EN-DC-127, "Control of Hot Work and Ignition Sources,"
-27-
contains the governing guidelines for the conduct of hot work, including "Hot Work
Enclosure
Permit," Attachment 8.1, which serves to document that the applicable requirements for
    b.
Findings
During the Unit 2 pressurizer replacement Refueling Outage 2R18 from September 19
through October 28, 2006, several deficiencies were noted involving the conduct of hot
work.  Licensee Procedure EN-DC-127, Control of Hot Work and Ignition Sources,
contains the governing guidelines for the conduct of hot work, including Hot Work
Permit, Attachment 8.1, which serves to document that the applicable requirements for
each activity involving hot work are met.  Examples of instances resulting from failures to
each activity involving hot work are met.  Examples of instances resulting from failures to
adequately implement the control of hot work procedure included:*On September 24, 2006, welding activities being conducted on the Unit 2 maincondenser manway cover resulted in paint/crud smoldering that was extinguished
adequately implement the control of hot work procedure included:
with a portable fire extinguisher.*On September 25, 2006, sparks from torch cutting of the Unit 2 containment sumpstrainer ignited a nearby plastic bag containing used anti-contamination clothing.  *On September 26, 2006, a substantial amount of slag from the containment sumpstrainer torch cutting flowed down onto a fire blanket that was protecting the floor
*
and caused the fire blanket to ignite.*On September 27, 2006, slag from the containment sump strainer torch cuttingflowed down through a fire blanket and landed on Valve 2BS-38 in the containment
On September 24, 2006, welding activities being conducted on the Unit 2 main
condenser manway cover resulted in paint/crud smoldering that was extinguished
with a portable fire extinguisher.
*
On September 25, 2006, sparks from torch cutting of the Unit 2 containment sump
strainer ignited a nearby plastic bag containing used anti-contamination clothing.   
*
On September 26, 2006, a substantial amount of slag from the containment sump
strainer torch cutting flowed down onto a fire blanket that was protecting the floor
and caused the fire blanket to ignite.
*
On September 27, 2006, slag from the containment sump strainer torch cutting
flowed down through a fire blanket and landed on Valve 2BS-38 in the containment
sump.  The slag came in contact with debris buildup on the valve locking chain and
sump.  The slag came in contact with debris buildup on the valve locking chain and
began to smoke and smolder.  A portable fire extinguisher was discharged to
began to smoke and smolder.  A portable fire extinguisher was discharged to
extinguish the smoldering.*On September 28, 2006, the firewatch posted for the containment sump strainerhot work could not get to his designated fire extinguisher.  The firewatch had
extinguish the smoldering.
*
On September 28, 2006, the firewatch posted for the containment sump strainer
hot work could not get to his designated fire extinguisher.  The firewatch had
moved to the east side of the sump and the extinguisher remained on the west
moved to the east side of the sump and the extinguisher remained on the west
side of the sump. *On October 5, 2006, a small fire in the Unit 2 containment building basementbelow the pressurizer was extinguished by the assigned firewatch using a portable
side of the sump.  
extinguisher.*On October 16, 2006, welding and grinding activities above the replacementpressurizer were being performed without proper protection to prevent sparks from
*
traveling down the cavity below. The licensee entered each of these occurrences into their CAP..4Access Control to Radiologically Significant AreasSection 2OS1 evaluated the effectiveness of the licensee's problem identification andresolution processes regarding access controls to radiologically significant areas and
On October 5, 2006, a small fire in the Unit 2 containment building basement
below the pressurizer was extinguished by the assigned firewatch using a portable
extinguisher.
*
On October 16, 2006, welding and grinding activities above the replacement
pressurizer were being performed without proper protection to prevent sparks from
traveling down the cavity below.  
The licensee entered each of these occurrences into their CAP.
.4
Access Control to Radiologically Significant Areas
Section 2OS1 evaluated the effectiveness of the licensee's problem identification and
resolution processes regarding access controls to radiologically significant areas and
radiation worker practices.  The inspectors reviewed corrective action documents for root
radiation worker practices.  The inspectors reviewed corrective action documents for root
cause/apparent cause analysis against the licensee's problem identification and resolution
cause/apparent cause analysis against the licensees problem identification and resolution
process.  No findings of significance were identified.  
process.  No findings of significance were identified.
-28-Enclosure4OA3Follow-up of Events and Notices of Enforcement Discretion (71153)     a.Inspection ScopeThe inspectors:  (1) reviewed operator logs, plant computer data, and/or strip charts forthe below listed evolutions to evaluate operator performance in coping with nonroutine
 
-28-
Enclosure
4OA3 Follow-up of Events and Notices of Enforcement Discretion (71153)
    a.
Inspection Scope
The inspectors:  (1) reviewed operator logs, plant computer data, and/or strip charts for
the below listed evolutions to evaluate operator performance in coping with nonroutine
events and transients; (2) verified that operator actions were in accordance with the
events and transients; (2) verified that operator actions were in accordance with the
response required by plant procedures and training; and (3) verified that the licensee has
response required by plant procedures and training; and (3) verified that the licensee has
identified and implemented appropriate corrective actions associated with personnel
identified and implemented appropriate corrective actions associated with personnel
performance problems that occurred during the nonroutine evolutions sampled. *October 26, 2006, Unit 1, fish intrusion into the circulating water system*October 30, 2006, Unit 2, fire in Motor-Control Center 2B-53
performance problems that occurred during the nonroutine evolutions sampled.  
*November 9, 2006, Unit 1, unplanned loss of Main Feedwater Pump P-2ADocuments reviewed by the inspectors are listed in the attachment.
*
The inspectors completed three samples.      b.FindingsIntroduction.  A Green self-revealing finding was identified when the licensee replaced anair conditioning unit for the Unit 1 Main Feedwater Pump (MFP) A control cabinet without
October 26, 2006, Unit 1, fish intrusion into the circulating water system
*
October 30, 2006, Unit 2, fire in Motor-Control Center 2B-53
*
November 9, 2006, Unit 1, unplanned loss of Main Feedwater Pump P-2A
Documents reviewed by the inspectors are listed in the attachment.
The inspectors completed three samples.  
     b.
Findings
Introduction.  A Green self-revealing finding was identified when the licensee replaced an
air conditioning unit for the Unit 1 Main Feedwater Pump (MFP) A control cabinet without
considering the effects of electromagnetic interference (EMI) on the digital speed
considering the effects of electromagnetic interference (EMI) on the digital speed
monitor (DSM) housed in the cabinet.  Consequently, MFP A tripped, resulting in an
monitor (DSM) housed in the cabinet.  Consequently, MFP A tripped, resulting in an
unplanned automatic plant power reduction from 100 percent to 40 percent RTP.Description.  In September 2006 the air conditioning unit for the Unit 1 MFP A cabinetfailed.  During the procurement phase of replacement efforts, the station discovered that
unplanned automatic plant power reduction from 100 percent to 40 percent RTP.
the current air conditioning unit was no longer available because it had become obsolete. The licensee contacted the cabinet manufacturer who recommended to the licensee a
Description.  In September 2006 the air conditioning unit for the Unit 1 MFP A cabinet
failed.  During the procurement phase of replacement efforts, the station discovered that
the current air conditioning unit was no longer available because it had become obsolete.  
The licensee contacted the cabinet manufacturer who recommended to the licensee a
replacement unit.  On October 12 the licensee replaced the air conditioning unit with the
replacement unit.  On October 12 the licensee replaced the air conditioning unit with the
recommended replacement after evaluating it as being an equivalent unit in accordance
recommended replacement after evaluating it as being an equivalent unit in accordance
with Procedure EN-DC-313, "Procurement Engineering Process," Revision 0. Subsequently, on November 9, 2006, while Unit 1 was operating at 100 percent RTPMFP A tripped, which caused the integrated control system to initiate and perform an
with Procedure EN-DC-313, Procurement Engineering Process, Revision 0.  
Subsequently, on November 9, 2006, while Unit 1 was operating at 100 percent RTP
MFP A tripped, which caused the integrated control system to initiate and perform an
unplanned automatic power reduction to 40 percent RTP.  Operators surveyed the
unplanned automatic power reduction to 40 percent RTP.  Operators surveyed the
indications and concluded that the cause of the MFP trip was an overspeed condition;
indications and concluded that the cause of the MFP trip was an overspeed condition;
however, at the time of the trip, there were no indications that the MFP had actually
however, at the time of the trip, there were no indications that the MFP had actually
experienced an overspeed. After extensive troubleshooting, the licensee suspected that EMI from the air conditioningunit was the cause of the faults.  The licensee performed a review of the new air
experienced an overspeed.  
conditioning unit and identified that the bottom section of the new unit was molded plasticand not metal like the previous unit.  They also discovered the configuration of this new
After extensive troubleshooting, the licensee suspected that EMI from the air conditioning
unit was the cause of the faults.  The licensee performed a review of the new air
conditioning unit and identified that the bottom section of the new unit was molded plastic
and not metal like the previous unit.  They also discovered the configuration of this new
unit placed the blower fan directly above, and in closer proximity to, the DSM than did that
unit placed the blower fan directly above, and in closer proximity to, the DSM than did that
of the previous air conditioning unit.  The licensee decided to remove power to the air
of the previous air conditioning unit.  The licensee decided to remove power to the air
conditioning unit to verify that it was the initiator of the faults in the DSM.  With power to
conditioning unit to verify that it was the initiator of the faults in the DSM.  With power to
the air conditioning unit removed, the faults and trips did not recur.
the air conditioning unit removed, the faults and trips did not recur.  
-29-EnclosureThe inspectors reviewed the licensee's root cause evaluation of this event, documented inCR ANO-1-2006-1399, which determined the root cause to be that the procurement
 
-29-
Enclosure
The inspectors reviewed the licensees root cause evaluation of this event, documented in
CR ANO-1-2006-1399, which determined the root cause to be that the procurement
engineering equivalency guidelines did not consider EMI as a potential failure mode.  
engineering equivalency guidelines did not consider EMI as a potential failure mode.  
During this review, the inspectors noted that the licensee had not questioned or
During this review, the inspectors noted that the licensee had not questioned or
investigated any of the differences between the old and the new air conditioning units.  
investigated any of the differences between the old and the new air conditioning units.  
Instead, the licensee had relied on the manufacturer's designation that the new unit was
Instead, the licensee had relied on the manufacturers designation that the new unit was
an equivalent replacement for the old unit.Also, during their review of the root cause analysis, the inspectors noted that there hadbeen previous experiences with the MFP A control system involving EMI, as well as a
an equivalent replacement for the old unit.
Also, during their review of the root cause analysis, the inspectors noted that there had
been previous experiences with the MFP A control system involving EMI, as well as a
substantial amount of industry operating experience concerning the topic of EMI and
substantial amount of industry operating experience concerning the topic of EMI and
digital components.  During interviews with station personnel, the inspectors also
digital components.  During interviews with station personnel, the inspectors also
determined that station engineers received specific training on EMI related to digital
determined that station engineers received specific training on EMI related to digital
components.Analysis.  The inspectors determined that the failure of the licensee to adequatelyevaluate the new air conditioning unit with respect to design differences and possibleEMI interactions was a performance deficiency.  The finding was determined to be more
components.
Analysis.  The inspectors determined that the failure of the licensee to adequately
evaluate the new air conditioning unit with respect to design differences and possible
EMI interactions was a performance deficiency.  The finding was determined to be more
than minor because it affected the design control attribute of the initiating events
than minor because it affected the design control attribute of the initiating events
cornerstone objective to limit the likelihood of those events that upset plant stability and
cornerstone objective to limit the likelihood of those events that upset plant stability and
challenge critical safety functions during shutdown as well as power operations.  Using theMC 0609, "Significance Determination Process," Phase 1 Worksheet, the finding is
challenge critical safety functions during shutdown as well as power operations.  Using the
MC 0609, Significance Determination Process, Phase 1 Worksheet, the finding is
determined to have very low safety significance because the condition only affected the
determined to have very low safety significance because the condition only affected the
initiating events cornerstone and did not contribute to both the likelihood of a reactor trip
initiating events cornerstone and did not contribute to both the likelihood of a reactor trip
and the likelihood that mitigation equipment or functions will not be available.  The cause
and the likelihood that mitigation equipment or functions will not be available.  The cause
of the finding is related to the crosscutting element of problem identification and resolutionassociated with operating experience because the licensee's failure to implement and
of the finding is related to the crosscutting element of problem identification and resolution
institutionalize OE through changes to station processes and procedures.Enforcement.  While a performance deficiency was identified with regard to the trip of theMFP A, there were no violations identified during the review of this issue.  The licensee
associated with operating experience because the licensees failure to implement and
institutionalize OE through changes to station processes and procedures.
Enforcement.  While a performance deficiency was identified with regard to the trip of the
MFP A, there were no violations identified during the review of this issue.  The licensee
has entered this issue into the CAP as CR ANO-1-2006-1399:  FIN 05000313/2006005-5,
has entered this issue into the CAP as CR ANO-1-2006-1399:  FIN 05000313/2006005-5,
"Trip of a MFP Due to Inadequate Design Control."4OA5Other Activities.1(Closed) Temporary Instruction (TI) 2515/169, Mitigating Systems PerformanceIndex (MSPI) Verification     a.Inspection ScopeDuring this inspection period, the inspectors completed a review of the licensee'simplementation of the MSPI in accordance with the guidance provided in TI 2515/169.  
Trip of a MFP Due to Inadequate Design Control.
The review examined the licensee's MSPI Basis Documents (ANO1-A-6-0001, Revision 1,
4OA5 Other Activities
.1
(Closed) Temporary Instruction (TI) 2515/169, Mitigating Systems Performance
Index (MSPI) Verification
    a.
Inspection Scope
During this inspection period, the inspectors completed a review of the licensees
implementation of the MSPI in accordance with the guidance provided in TI 2515/169.  
The review examined the licensees MSPI Basis Documents (ANO1-A-6-0001, Revision 1,
and ANO2-SA-06-00001, Revision 0) and verified the established system boundaries and
and ANO2-SA-06-00001, Revision 0) and verified the established system boundaries and
monitored components were consistent with guidance provided in NEI 99-02, "Reactor
monitored components were consistent with guidance provided in NEI 99-02, Reactor
Oversight Process Performance Indicators," Revision 4.  The inspectors verified that the
Oversight Process Performance Indicators, Revision 4.  The inspectors verified that the
licensee did not include credit for unavailability hours for "short term unavailability" or
licensee did not include credit for unavailability hours for short term unavailability or
"operator recovery actions to restore the risk-significant function" as is allowed by
operator recovery actions to restore the risk-significant function as is allowed by
NEI 99-02.  
NEI 99-02.
-30-EnclosureAdditionally, the inspectors reviewed the baseline MSPI unavailability time using plantspecific values for the period of 2002 through 2004.  The verification included all planned
 
-30-
Enclosure
Additionally, the inspectors reviewed the baseline MSPI unavailability time using plant
specific values for the period of 2002 through 2004.  The verification included all planned
and unplanned unavailability.  For Unit 1, the inspectors reviewed the baseline MSPI
and unplanned unavailability.  For Unit 1, the inspectors reviewed the baseline MSPI
unreliability data using plant specific values for the period of 2002 through 2004.  Unit 2
unreliability data using plant specific values for the period of 2002 through 2004.  Unit 2
Line 720: Line 1,544:
and work order documents.  The unavailability and unreliability data was compared with PI
and work order documents.  The unavailability and unreliability data was compared with PI
data submitted to the NRC to ensure that any discrepancies would not result in a change
data submitted to the NRC to ensure that any discrepancies would not result in a change
to the index color.     b.FindingsNo findings of significance were identified.  This completes the inspection requirementsfor this TI..2Institute of Nuclear Power Operations Plant Assessment Report Review      a.Inspection ScopeThe inspectors reviewed the final report for the Institute of Nuclear Power Operationsplant assessment of Arkansas Nuclear One, Units 1 and 2, conducted in July and
to the index color.
    b.
Findings
No findings of significance were identified.  This completes the inspection requirements
for this TI.
.2
Institute of Nuclear Power Operations Plant Assessment Report Review  
     a.
Inspection Scope
The inspectors reviewed the final report for the Institute of Nuclear Power Operations
plant assessment of Arkansas Nuclear One, Units 1 and 2, conducted in July and
August 2006. The inspectors reviewed the report to ensure that issues identified were
August 2006. The inspectors reviewed the report to ensure that issues identified were
consistent with the NRC perspectives of licensee performance and to verify if any
consistent with the NRC perspectives of licensee performance and to verify if any
significant safety issues were identified that required further NRC followup.      b.FindingsNo findings of significance were identified..3(Closed) Unresolved Item (URI) 05000313/2006003-01, Failure to Retrieve RequiredRecords of Activities Affecting QualityIn response to inspectors questioning the seismic capability of the Tendon SurveillanceCranes L-28 on Unit 1, the licensee could not locate the appropriate documentation.  The
significant safety issues were identified that required further NRC followup.  
     b.
Findings
No findings of significance were identified.
.3
(Closed) Unresolved Item (URI) 05000313/2006003-01, Failure to Retrieve Required
Records of Activities Affecting Quality
In response to inspectors questioning the seismic capability of the Tendon Surveillance
Cranes L-28 on Unit 1, the licensee could not locate the appropriate documentation.  The
licensee evaluated the as found conditions of the cranes against the uniformed building
licensee evaluated the as found conditions of the cranes against the uniformed building
code.  The licensee concluded that the cranes would be able to withstand the design
code.  The licensee concluded that the cranes would be able to withstand the design
Line 730: Line 1,572:
of NRC requirements were identified. The licensee documented the evaluations
of NRC requirements were identified. The licensee documented the evaluations
demonstrating the seismic qualification in CR ANO-1-2005-3109.  This unresolved
demonstrating the seismic qualification in CR ANO-1-2005-3109.  This unresolved
item (URI) is closed.  
item (URI) is closed.
-31-Enclosure.4NRC TI 2515/166, PWR Containment Sump BlockageThe inspectors reviewed ANO's Unit 2 implementation of plant modifications andprocedure changes committed to in their response to Generic Letter 2004-02, "Potential
 
Impact of Debris on Emergency Recirculation During Design Basis Accidents atPressurized Water Reactors."The inspectors observed installation of the containment recirculation sump strainers,debris barriers, and interceptors.  In addition, the inspectors verified that ANO Unit 2 has
-31-
Enclosure
.4
NRC TI 2515/166, PWR Containment Sump Blockage
The inspectors reviewed ANOs Unit 2 implementation of plant modifications and
procedure changes committed to in their response to Generic Letter 2004-02, Potential
Impact of Debris on Emergency Recirculation During Design Basis Accidents at
Pressurized Water Reactors.
The inspectors observed installation of the containment recirculation sump strainers,
debris barriers, and interceptors.  In addition, the inspectors verified that ANO Unit 2 has
implemented specific procedure changes to control tags, labels, tape, and other objects
implemented specific procedure changes to control tags, labels, tape, and other objects
inside the containment building.At the time of the inspection, industry testing for chemical effects on containmentrecirculation sumps was not complete.  Since the testing was not complete, ANO Unit 2
inside the containment building.
At the time of the inspection, industry testing for chemical effects on containment
recirculation sumps was not complete.  Since the testing was not complete, ANO Unit 2
evaluated the new recirculation sump modifications to the original design basis,
evaluated the new recirculation sump modifications to the original design basis,
Regulatory Guide 1.82, "Water Sources for Long-Term Recirculation Cooling Following a
Regulatory Guide 1.82, Water Sources for Long-Term Recirculation Cooling Following a
Loss-of-Coolant Accident," Revision 0.  Final review and acceptance of the modification
Loss-of-Coolant Accident, Revision 0.  Final review and acceptance of the modification
will be performed by the Office of Nuclear Reactor Regulation at a later date.4OA6Meetings, Including ExitOn October 6, 2006, the inspectors presented the access controls inspection results toMr. T. Mitchell, General Manager and other members of his staff who acknowledged the
will be performed by the Office of Nuclear Reactor Regulation at a later date.
4OA6 Meetings, Including Exit
On October 6, 2006, the inspectors presented the access controls inspection results to
Mr. T. Mitchell, General Manager and other members of his staff who acknowledged the
findings.  The inspectors confirmed that proprietary information was not provided or
findings.  The inspectors confirmed that proprietary information was not provided or
examined during the inspection.The engineering inspectors presented the results of the inservice inspection review toMr. J. Kowalewski, Director, Engineering, on October 10, 2006.  Mr. Kowalewski
examined during the inspection.
The engineering inspectors presented the results of the inservice inspection review to
Mr. J. Kowalewski, Director, Engineering, on October 10, 2006.  Mr. Kowalewski
acknowledged the inspection findings.  The engineering inspector conducted a followup
acknowledged the inspection findings.  The engineering inspector conducted a followup
exit with Mr. T. Mitchell, General Manager, Plant Operations, on December 4, 2006, to
exit with Mr. T. Mitchell, General Manager, Plant Operations, on December 4, 2006, to
provide updated information on the documentation associated with the review of the
provide updated information on the documentation associated with the review of the
containment sump modification.  The inspectors identified that they had not reviewed
containment sump modification.  The inspectors identified that they had not reviewed
proprietary information.On November 1, 2006, the inspector presented the results of the emergency plan changeinspection to Mr. R. Holeyfield, Supervisor, Emergency Preparedness.  The inspector
proprietary information.
On November 1, 2006, the inspector presented the results of the emergency plan change
inspection to Mr. R. Holeyfield, Supervisor, Emergency Preparedness.  The inspector
confirmed that proprietary information was not provided or examined during the
confirmed that proprietary information was not provided or examined during the
inspection.The resident inspectors presented the inspection results of the resident inspections toMr. J. Forbes, Vice President, Operations, and other members of the licensee's
inspection.
The resident inspectors presented the inspection results of the resident inspections to
Mr. J. Forbes, Vice President, Operations, and other members of the licensee's
management staff on January 17, 2007.  The resident inspectors conducted a followup
management staff on January 17, 2007.  The resident inspectors conducted a followup
exit with Mr. J. Forbes, Vice President, Operations, on February 8, 2007.  The licensee
exit with Mr. J. Forbes, Vice President, Operations, on February 8, 2007.  The licensee
acknowledged the findings presented.  The inspectors noted that while proprietary
acknowledged the findings presented.  The inspectors noted that while proprietary
information was reviewed, none would be included in this report.ATTACHMENT:  SUPPLEMENTAL INFORMATION  
information was reviewed, none would be included in this report.
A-1AttachmentSUPPLEMENTAL INFORMATIONKEY POINTS OF CONTACTLicensee PersonnelR. Barnes, Manager, Planning, Scheduling, and OutagesS. Bennett, Project Manager, Licensing
ATTACHMENT:  SUPPLEMENTAL INFORMATION
 
A-1
Attachment
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
R. Barnes, Manager, Planning, Scheduling, and Outages
S. Bennett, Project Manager, Licensing
B. Berryman, Manager, Operations Unit 1
B. Berryman, Manager, Operations Unit 1
J. Browning, Manager, Operations Unit 2  
J. Browning, Manager, Operations Unit 2  
Line 782: Line 1,652:
D. White, Emergency Planner
D. White, Emergency Planner
P. Williams, Supervisor, Systems Engineering
P. Williams, Supervisor, Systems Engineering
M. Woodby, Manager, Design EngineeringLIST OF ITEMS OPENED, CLOSED, AND DISCUSSEDOpened and Closed05000368/2006005-01NCVFire During Hot Work Activities on the Containment SumpStrainer (Section 1R05)05000368/2006005-02NCVFailure to Perform Modification Resulted in an InoperableRCP Oil Collection System (Section 1R15)  
M. Woodby, Manager, Design Engineering
A-2Attachment05000368/2006005-03NCVInadvertent RCS Draining While in Mode 5 (Section 1R20)05000368/2006005-04FINUnplanned Increase in Time with Reactor Vessel Water Levelat Flange Level (Section 1R20)05000313/2006005-05FINTrip of a MFP Due to Inadequate Design Control(Section 4OA3)
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Closed05000313/2006003-01URIFailure to Retrieve Required Records of Activities AffectingQuality (Section 4OA5)
Opened and Closed
Discussed NoneLIST OF DOCUMENTS REVIEWEDIn addition to the documents referred to in the inspection report, the following documents wereselected and reviewed by the inspectors to accomplish the objectives and scope of the inspection
05000368/2006005-01
and to support any findings:Section 1R01:  Adverse Weather ProtectionNUMBERTITLEREVISIONOP-2203.008Natural Emergencies9
NCV
OP-1203.025Natural Emergencies20Section 1R02:  Evaluation of Changes, Tests, or ExperimentsEngineering RequestsNUMBERTITLEREVISIONER-ANO-2002-0836-003Pressurizer Replacement 1
Fire During Hot Work Activities on the Containment Sump
ER-ANO-2002-0836-004Original Pressurizer Removal / ReplacementPressurizer Installation
Strainer (Section 1R05)
1ER-ANO-2002-0836-020Replacement Pressurizer Heater Electrical DesignInput 0  
05000368/2006005-02
A-3AttachmentSection 1R04:  Equipment AlignmentProceduresNUMBERTITLEREVISIONOP-1104.036Emergency Diesel Generator Operations45
NCV
Op-1107.002ES Electrical System Operations23
Failure to Perform Modification Resulted in an Inoperable
OP-1104.005Reactor Building Spray System Operation46Section 1R05:  Fire ProtectionPlant DrawingsFZ-1038, Sheet 1, Revision 2FZ-2018, Sheet 1, Revision 2ProceduresNUMBERTITLEREVISIONArkansas Nuclear One Fire Hazards Analysis11PFP-U1ANO Prefire Plan (Unit 1) - Section 1B-357-67-U.doc, Section 1B-354-79-U.doc
RCP Oil Collection System (Section 1R15)
2PFP-U2ANO Prefire Plan (Unit 2) - Section 2B-335-2040-
 
JJ.doc 2EN-DC-127Control of Hot Work and Ignition Sources2
A-2
CRsANO-1-2005-0950ANO-1-2005-1397ANO-2-2005-1724ANO-2-2006-1565ANO-2-2006-1701Section 1R07:  Heat Sink PerformanceNUMBERTITLEREVISIONULD-1-SYS-01ANO-1 Emergency Diesel Generator (EDG) System4
Attachment
ULD-1-SYS-10ANO-1 Service Water Systems13
05000368/2006005-03
SPEC-6600-M-012Emergency Diesel Generators for ANO Unit 11
NCV
ER-ANO-2004-0663-000 2004 Unit 1 EDG Thermal Test Results0
Inadvertent RCS Draining While in Mode 5 (Section 1R20)
ER-980310 EDG Coolers, E-20A/B, Service Water FlowRequirementsCALC-91-R-2013-01 Service Water Performance Testing Methodology14
05000368/2006005-04
A-4AttachmentOP-1309.018 EDG Cooler Thermal TestChange 004-02-0Section 1R08:  Inservice Inspection (71111.08P)
FIN
CRs:ANO-2-2005-0916ANO-2-2006-1208ANO-C-2006-1733
Unplanned Increase in Time with Reactor Vessel Water Level
NDEsREPORTCOMPONENT/LOCATIONMETHODBOP-RT-06-055FW-50 (WDR-40631) Drawing No. 2CCA-15-1, Sheet 1Radiographic
at Flange Level (Section 1R20)
BOP-RT-06-056FW-51 (WDR-40632) Drawing No. 2CCA-15-1, Sheet 1Radiographic
05000313/2006005-05
ISI-UT-06-0332-73-SWS-R-12B-30R,  2HBC-60-1 between FW-52C &FW-6C1AutomaticUltrasonicISI-UT-06-040FW-50 (WDR-40631) Drawing No. 2CCA-15-1, Sheet 1Ultrasonic
FIN
ISI-UT-06-042FW-51 (WDR-40632) Drawing No. 2CCA-15-1, Sheet 1UltrasonicProceduresPROCEDURETITLEREVISIONCEP-NDE-0110Program Section for Certification of NDE Personnel2
Trip of a MFP Due to Inadequate Design Control
CEP-NDE-0111Certification of Ultrasonic Personnel in Accordancewith ASME Section XI, Appendix VII
(Section 4OA3)
1CEP-NDE-0400Ultrasonic Examination0CEP-NDE-0404Manual Ultrasonic Examination of Ferritic PipingWelds (ASME XI)
Closed
1CEP-NDE-0423Manual Ultrasonic Examination of Austenitic PipingWelds (ASME XI)
05000313/2006003-01
1CEP-NDE-0505Ultrasonic Thickness Examination3
URI
A-5AttachmentWelding Procedures/Qualification RecordsNUMBERTITLEREVISION/DATEPQR 107Manual Gas Tungsten & Shielded Metal ArcWelding (GTAW & SMAW), P-No. 8, SA-312 Type
Failure to Retrieve Required Records of Activities Affecting
Quality (Section 4OA5)
Discussed
None
LIST OF DOCUMENTS REVIEWED
In addition to the documents referred to in the inspection report, the following documents were
selected and reviewed by the inspectors to accomplish the objectives and scope of the inspection
and to support any findings:
Section 1R01:  Adverse Weather Protection
NUMBER
TITLE
REVISION
OP-2203.008
Natural Emergencies
9
OP-1203.025
Natural Emergencies
20
Section 1R02:  Evaluation of Changes, Tests, or Experiments
Engineering Requests
NUMBER
TITLE
REVISION
ER-ANO-2002-0836-003
Pressurizer Replacement  
1
ER-ANO-2002-0836-004
Original Pressurizer Removal / Replacement
Pressurizer Installation
1
ER-ANO-2002-0836-020
Replacement Pressurizer Heater Electrical Design
Input
0
 
A-3
Attachment
Section 1R04:  Equipment Alignment
Procedures
NUMBER
TITLE
REVISION
OP-1104.036
Emergency Diesel Generator Operations
45
Op-1107.002
ES Electrical System Operations
23
OP-1104.005
Reactor Building Spray System Operation
46
Section 1R05:  Fire Protection
Plant Drawings
FZ-1038, Sheet 1, Revision 2
FZ-2018, Sheet 1, Revision 2
Procedures
NUMBER
TITLE
REVISION
Arkansas Nuclear One Fire Hazards Analysis
11
PFP-U1
ANO Prefire Plan (Unit 1) - Section 1B-357-67-U.doc,  
Section 1B-354-79-U.doc
2
PFP-U2
ANO Prefire Plan (Unit 2) - Section 2B-335-2040-
JJ.doc
2
EN-DC-127
Control of Hot Work and Ignition Sources
2
CRs
ANO-1-2005-0950
ANO-1-2005-1397
ANO-2-2005-1724
ANO-2-2006-1565
ANO-2-2006-1701
Section 1R07:  Heat Sink Performance
NUMBER
TITLE
REVISION
ULD-1-SYS-01
ANO-1 Emergency Diesel Generator (EDG) System
4
ULD-1-SYS-10
ANO-1 Service Water Systems
13
SPEC-6600-M-012
Emergency Diesel Generators for ANO Unit 1
1
ER-ANO-2004-0663-000  
2004 Unit 1 EDG Thermal Test Results
0
ER-980310  
EDG Coolers, E-20A/B, Service Water Flow
Requirements
CALC-91-R-2013-01  
Service Water Performance Testing Methodology
14


304 1PQR 170Manual Gas Tungsten & Shielded Metal ArcWelding (GTAW & SMAW), P-No. 8, SA-240 Type
A-4
Attachment
OP-1309.018
EDG Cooler Thermal Test
Change 004-02-0
Section 1R08:  Inservice Inspection (71111.08P)
CRs:
ANO-2-2005-0916
ANO-2-2006-1208
ANO-C-2006-1733
NDEs
REPORT
COMPONENT/LOCATION
METHOD
BOP-RT-06-055
FW-50 (WDR-40631) Drawing No. 2CCA-15-1, Sheet 1
Radiographic
BOP-RT-06-056
FW-51 (WDR-40632) Drawing No. 2CCA-15-1, Sheet 1
Radiographic
ISI-UT-06-033
2-73-SWS-R-12B-30R,  2HBC-60-1 between FW-52C &
FW-6C1
Automatic
Ultrasonic
ISI-UT-06-040
FW-50 (WDR-40631) Drawing No. 2CCA-15-1, Sheet 1
Ultrasonic
ISI-UT-06-042
FW-51 (WDR-40632) Drawing No. 2CCA-15-1, Sheet 1
Ultrasonic
Procedures
PROCEDURE
TITLE
REVISION
CEP-NDE-0110
Program Section for Certification of NDE Personnel
2
CEP-NDE-0111
Certification of Ultrasonic Personnel in Accordance
with ASME Section XI, Appendix VII
1
CEP-NDE-0400
Ultrasonic Examination
0
CEP-NDE-0404
Manual Ultrasonic Examination of Ferritic Piping
Welds (ASME XI)
1
CEP-NDE-0423
Manual Ultrasonic Examination of Austenitic Piping
Welds (ASME XI)
1
CEP-NDE-0505
Ultrasonic Thickness Examination
3


304 1WPS E-P8-T-A8,ArManual Gas Tungsten Arc Welding (GTAW) ofP-No. 8 Stainless Steels
A-5
0WPS E-P8-T(M)-A8,ArMachine Gas Tungsten Arc Welding (GTAW) ofP-No. 8 Stainless Steels
Attachment
0WP 06-1212T-1 Surge LineOctober 3, 2006Section 1R13:  Maintenance Risk Assessments and Emergent Work ControlCOPD-024, "Risk Assessment Guidelines," Revision 18Section 1R15:  Operability Evaluations
Welding Procedures/Qualification Records
CRsANO-2-1995-0555ANO-2-2006-1407
NUMBER
ANO-2-2006-1433ANO-2-2006-1459ANO-2-2006-1478
TITLE
ANO-2-2006-1521ANO-2-2006-1522ANO-2-2006-1539
REVISION/
ANO-2-2006-1757ANO-2-2006-1796ANO-2-2006-1853
DATE
ANO-2-2006-1879ProcedureOP-2305.002, "Reactor Coolant System Leak Detection," Revision 14
PQR 107
Engineering RequestsER-ANO-2000-2528-003, "ANO Sump Operability when the RCS Temperature is Above 200 F"ER-ANO-2004-0060-000, "ANO-2 Sump Operability for the RCS Temperature above 200 F"Miscellaneous Documents2CNA108802, "Safety Evaluation Report," dated October 26, 19880CAN088404, "Station Letter to USNRC Requesting Exemption," dated August 15, 1984  
Manual Gas Tungsten & Shielded Metal Arc
A-6AttachmentSection 1R17:  Permanent Plant ModificationsEngineering RequestsNUMBERTITLEER-ANO-2002-0836-003Pressurizer Replacement
Welding (GTAW & SMAW), P-No. 8, SA-312 Type
ER-ANO-2002-0836-004Original Pressurizer Removal / ReplacementPressurizer InstallationER-ANO-2002-0836-005Interference Removal / Reinstallation Inside thePressurizer CubicleER-ANO-2002-0836-006Interference Removal / Reinstallation Outside thePressurizer CubicleER-ANO-2002-0836-007ANO-2 Pressurizer Replacement Rigging and
304
HandlingER-ANO-2002-0836-020Replacement Pressurizer Heater Electrical DesignInputSection 1R20:  Refueling and Outage ActivitiesProceduresNUMBERTITLEREVISIONOP-2104.004Shutdown Cooling System031-00-0
1
OP-2104.019Clean Resin Transfer009-01-0
PQR 170
OP-2504.005Reactor Vessel Closure Head Removal012-01-0Miscellaneous DocumentShutdown Operations Protection Plan, dated August 4, 2005
Manual Gas Tungsten & Shielded Metal Arc
CRsANO-2-2006-1464ANO-2-2006-1553ANO-2-2006-1573ANO-2-2006-1734ANO-2-2006-2032ANO-C-2006-1473ANO-C-2006-1678Section 2OS1:  Access Controls to Radiologically Significant Areas
Welding (GTAW & SMAW), P-No. 8, SA-240 Type
CRsANO-1-2006-0479ANO-1-2006-0700
304
1
WPS E-P8-T-A8,Ar
Manual Gas Tungsten Arc Welding (GTAW) of
P-No. 8 Stainless Steels
0
WPS E-P8-T(M)-A8,Ar
Machine Gas Tungsten Arc Welding (GTAW) of
P-No. 8 Stainless Steels
0
WP 06-121
2T-1 Surge Line
October 3,
2006
Section 1R13:  Maintenance Risk Assessments and Emergent Work Control
COPD-024, Risk Assessment Guidelines, Revision 18
Section 1R15:  Operability Evaluations
CRs
ANO-2-1995-0555
ANO-2-2006-1407
ANO-2-2006-1433
ANO-2-2006-1459
ANO-2-2006-1478
ANO-2-2006-1521
ANO-2-2006-1522
ANO-2-2006-1539
ANO-2-2006-1757
ANO-2-2006-1796
ANO-2-2006-1853
ANO-2-2006-1879
Procedure
OP-2305.002, Reactor Coolant System Leak Detection, Revision 14
Engineering Requests
ER-ANO-2000-2528-003, ANO Sump Operability when the RCS Temperature is Above 200 F
ER-ANO-2004-0060-000, ANO-2 Sump Operability for the RCS Temperature above 200 F
Miscellaneous Documents
2CNA108802, Safety Evaluation Report, dated October 26, 1988
0CAN088404, Station Letter to USNRC Requesting Exemption, dated August 15, 1984
 
A-6
Attachment
Section 1R17:  Permanent Plant Modifications
Engineering Requests
NUMBER
TITLE
ER-ANO-2002-0836-003
Pressurizer Replacement
ER-ANO-2002-0836-004
Original Pressurizer Removal / Replacement
Pressurizer Installation
ER-ANO-2002-0836-005
Interference Removal / Reinstallation Inside the
Pressurizer Cubicle
ER-ANO-2002-0836-006
Interference Removal / Reinstallation Outside the
Pressurizer Cubicle
ER-ANO-2002-0836-007
ANO-2 Pressurizer Replacement Rigging and
Handling
ER-ANO-2002-0836-020
Replacement Pressurizer Heater Electrical Design
Input
Section 1R20:  Refueling and Outage Activities
Procedures
NUMBER
TITLE
REVISION
OP-2104.004
Shutdown Cooling System
031-00-0
OP-2104.019
Clean Resin Transfer
009-01-0
OP-2504.005
Reactor Vessel Closure Head Removal
012-01-0
Miscellaneous Document
Shutdown Operations Protection Plan, dated August 4, 2005
CRs
ANO-2-2006-1464
ANO-2-2006-1553
ANO-2-2006-1573
ANO-2-2006-1734
ANO-2-2006-2032
ANO-C-2006-1473
ANO-C-2006-1678
Section 2OS1:  Access Controls to Radiologically Significant Areas
CRs
ANO-1-2006-0479
ANO-1-2006-0700
ANO-1-2006-1113
ANO-1-2006-1113
ANO-2-2005-1429ANO-2-2006-1434ANO-2-2006-1446
ANO-2-2005-1429
ANO-2-2006-1434
ANO-2-2006-1446
ANO-2-2006-1471
ANO-2-2006-1471
ANO-2-2006-1495ANO-2-2006-1497ANO-2-2006-1501
ANO-2-2006-1495
ANO-2-2006-1497
ANO-2-2006-1501
ANO-2-2006-1511
ANO-2-2006-1511
ANO-2-2006-1523ANO-2-2006-1568ANO-2-2006-1568
ANO-2-2006-1523
ANO-2-2006-1568
ANO-2-2006-1568
ANO-2-2006-1575
ANO-2-2006-1575
ANO-2-2006-1598  
ANO-2-2006-1598
A-7AttachmentANO-2-2006-1606ANO-2-2006-1636
 
A-7
Attachment
ANO-2-2006-1606
ANO-2-2006-1636
ANO-2-2006-1638
ANO-2-2006-1638
ANO-2-2006-1671ANO-2-2006-1674ANO-2-2006-1675
ANO-2-2006-1671
ANO-2-2006-1674
ANO-2-2006-1675
ANO-2-2006-1695
ANO-2-2006-1695
ANO-2-2006-1696ANO-2-2006-1716ANO-2-2006-1717
ANO-2-2006-1696
ANO-2-2006-1716
ANO-2-2006-1717
ANO-2-2006-1748
ANO-2-2006-1748
ANO-2-2006-1765ANO-2-2006-1774ANO-2-2006-1790
ANO-2-2006-1765
ANO-C-2006-1698Audits and Self-AssessmentsSelf-Assessment Report, "QS-2006-ANO-007, 2R18 Radiation Protection Outage PlanningReview"Radiation Work PermitsNUMBERTITLERWP 2006-2420Scaffold Activities
ANO-2-2006-1774
RWP 2006-2501Support Activities for Pressurizer Replacement
ANO-2-2006-1790
RWP 2006-2502Remove and Replace Pressurizer
ANO-C-2006-1698
RWP 2006-2520Incore Instrument Thimble Tube Replacement
Audits and Self-Assessments
RWP 2005-2530Sump Screen Modification
Self-Assessment Report, QS-2006-ANO-007, 2R18 Radiation Protection Outage Planning
RWP 2006-2540Hot Leg RTD Replacement ProceduresNUMBERTITLEREVISION1601.209Whole Body Counting/BioassayCHANGE009-00EN-RP-104Personnel Contamination Events3
Review
EN-RP-108Radiation Protection Posting3
Radiation Work Permits
EN-RP-131Air Sampling1
NUMBER
EN-RP-203Dose Assessment0
TITLE
EN-RP-208Whole Body Counting and In-Vitro Bioassay0
RWP 2006-2420
PL-182Radiation Protection Expectations and Standards1Miscellaneous DocumentAlpha Monitoring Plan, Revised August 22, 2006  
Scaffold Activities
A-8AttachmentSection 4OA2:  Identification and Resolution of Problems
RWP 2006-2501
CRsANO-2-2006-1535ANO-2-2006-1625ANO-2-2006-1655ANO-2-2006-1693ANO-2-2006-1891ANO-2-2006-2174Section 4OA3:  Event Follow-upProceduresNUMBERTITLEREVISIONEN-DC-141Design Inputs2
Support Activities for Pressurizer Replacement
EN-DC-313Procurement Engineering Process0
RWP 2006-2502
CRsANO-1-2006-1399ANO-2-2006-1464ANO-2-2006-2444ANO-2-2006-2449Section 4OA5:  Other Activities (TI 2515/0166)Safety EvaluationFFN-06-008, "Unit 2 RBS/ECCS Sump Strainer Replacement"
Remove and Replace Pressurizer
A-9AttachmentLIST OF ACRONYMSANOArkansas Nuclear OneASMEAmerican Society of Mechanical Engineers Boiler and Pressure Vessel Code
RWP 2006-2520
CAPcorrective action program
Incore Instrument Thimble Tube Replacement
CCWcomponent cooling water
RWP 2005-2530
Sump Screen Modification
RWP 2006-2540
Hot Leg RTD Replacement
Procedures
NUMBER
TITLE
REVISION
1601.209
Whole Body Counting/Bioassay
CHANGE
009-00
EN-RP-104
Personnel Contamination Events
3
EN-RP-108
Radiation Protection Posting
3
EN-RP-131
Air Sampling
1
EN-RP-203
Dose Assessment
0
EN-RP-208
Whole Body Counting and In-Vitro Bioassay
0
PL-182
Radiation Protection Expectations and Standards
1
Miscellaneous Document
Alpha Monitoring Plan, Revised August 22, 2006


CFRCode of Federal RegulationsCRcondition report
A-8
DSMdigital speed monitor
Attachment
EDGemergency diesel generator
Section 4OA2:  Identification and Resolution of Problems
EMIelectromagnetic interference
CRs
FINfinding
ANO-2-2006-1535
MCmanual chapter
ANO-2-2006-1625
MFPmain feedwater pump
ANO-2-2006-1655
MSPImitigating systems performance index
ANO-2-2006-1693
NCVnoncited violation
ANO-2-2006-1891
NDEnondestructive examination
ANO-2-2006-2174
PIperformance indicator
Section 4OA3:  Event Follow-up
PWRpressurized water reactor
Procedures
RCPreactor coolant pump
NUMBER
RCSreactor coolant system
TITLE
RTPrated thermal power
REVISION
SSCssystem, structure, and components
EN-DC-141
TItemporary instruction
Design Inputs
TSTechnical Specification
2
UFSARUpdated Final Safety Analysis
EN-DC-313
URIunresolved item
Procurement Engineering Process
0
CRs
ANO-1-2006-1399
ANO-2-2006-1464
ANO-2-2006-2444
ANO-2-2006-2449
Section 4OA5:  Other Activities (TI 2515/0166)
Safety Evaluation
FFN-06-008, Unit 2 RBS/ECCS Sump Strainer Replacement
 
A-9
Attachment
LIST OF ACRONYMS
ANO
Arkansas Nuclear One
ASME
American Society of Mechanical Engineers Boiler and Pressure Vessel Code
CAP
corrective action program
CCW
component cooling water
CFR
Code of Federal Regulations
CR
condition report
DSM
digital speed monitor
EDG
emergency diesel generator
EMI
electromagnetic interference
FIN
finding
MC
manual chapter
MFP
main feedwater pump
MSPI
mitigating systems performance index
NCV
noncited violation
NDE
nondestructive examination
PI
performance indicator
PWR
pressurized water reactor
RCP
reactor coolant pump
RCS
reactor coolant system
RTP
rated thermal power
SSCs
system, structure, and components
TI
temporary instruction
TS
Technical Specification
UFSAR
Updated Final Safety Analysis
URI
unresolved item
}}
}}

Latest revision as of 03:13, 15 January 2025

IR 05000313-06-005 and 05000368-06-005 for Arkansas Nuclear One
ML070450249
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/14/2007
From: Clark J
NRC/RGN-IV/DRP/RPB-E
To: Forbes J
Entergy Operations
References
IR-06-005
Download: ML070450249 (44)


See also: IR 05000313/2006005

Text

February 14, 2007

Jeffrey S. Forbes, Vice President,

Operations

Arkansas Nuclear One

Entergy Operations, Inc.

1448 S.R. 333

Russellville, Arkansas 72801-0967

SUBJECT: ARKANSAS NUCLEAR ONE - NRC INTEGRATED INSPECTION REPORT

05000313/2006005 AND 05000368/2006005

Dear Mr. Forbes:

On December 31, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an

inspection at your Arkansas Nuclear One, Units 1 and 2, facility. The enclosed integrated

report documents the inspection findings, which were discussed on January 17, 2007, and

again on February 8, 2007, with you and other members of your staff.

The inspection examined activities conducted under your licenses as they relate to safety and

compliance with the Commission's rules and regulations and with the conditions of your

licenses. The inspectors reviewed selected procedures and records, observed activities, and

interviewed personnel.

The report documents five self-revealing findings of very low safety significance (Green). Three

of these findings were determined to involve violations of NRC requirements. However,

because of the very low safety significance and because they are entered into your corrective

action program, the NRC is treating these findings as noncited violations consistent with

Section VI.A.1 of the NRC Enforcement Policy. If you contest these noncited violations, you

should provide a response within 30 days of the date of this inspection report, with the basis for

your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk,

Washington DC 20555-0001; with copies to the Regional Administrator, U.S. Nuclear

Regulatory Commission Region IV, 611 Ryan Plaza Drive, Suite 400, Arlington, Texas

76011-4005; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission,

Washington DC 20555-0001; and the NRC Resident Inspector at Arkansas Nuclear One,

Units 1 and 2, facility.

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter, its

enclosure, and your response (if any) will be made available electronically for public inspection

Entergy Operations, Inc.

-2-

in the NRC Public Document Room or from the Publicly Available Records (PARS) component

of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Jeffrey A. Clark, Chief

Project Branch E

Division of Reactor Projects

Dockets: 50-313

50-368

Licenses: DPR-51

NPF-6

Enclosure:

NRC Inspection Report 05000313/2006005 and 05000368/2006005

w/Attachment: Supplemental Information

cc w/Enclosure:

Senior Vice President

& Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

General Manager Plant Operations

Entergy Operations, Inc.

Arkansas Nuclear One

1448 S. R. 333

Russellville, AR 72802

Director, Nuclear Safety Assurance

Entergy Operations, Inc.

Arkansas Nuclear One

1448 S. R. 333

Russellville, AR 72802

Entergy Operations, Inc.

-3-

Manager, Licensing

Entergy Operations, Inc.

Arkansas Nuclear One

1448 S. R. 333

Russellville, AR 72802

Director, Nuclear Safety & Licensing

Entergy Operations, Inc.

1340 Echelon Parkway

Jackson, MS 39213-8298

Section Chief, Division of Health

Radiation Control Section

Arkansas Department of Health and

Human Services

4815 West Markham Street, Slot 30

Little Rock, AR 72205-3867

Section Chief, Division of Health

Emergency Management Section

Arkansas Department of Health and

Human Services

4815 West Markham Street, Slot 30

Little Rock, AR 72205-3867

Manager, Washington Nuclear Operations

ABB Combustion Engineering Nuclear

Power

12300 Twinbrook Parkway, Suite 330

Rockville, MD 20852

County Judge of Pope County

Pope County Courthouse

100 West Main Street

Russellville, AR 72801

James Mallay

Director, Regulatory Affairs

Framatome ANP

3815 Old Forest Road

Lynchburg, VA 24501

Entergy Operations, Inc.

-4-

Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJC1)

Senior Resident Inspector (RWD)

Branch Chief, DRP/E (ZKD)

Senior Project Engineer, DRP/E (VGG)

Team Leader, DRP/TSS (RLN1)

RITS Coordinator (MSH3)

DRS STA (DAP)

D. Cullison, OEDO RIV Coordinator (DGC)

ROPreports

ANO Site Secretary (VLH)

SUNSI Review Completed: _JAC__ ADAMS: / Yes No Initials: __JAC____

/ Publicly Available G Non-Publicly Available G Sensitive

/ Non-Sensitive

R:\\_REACTORS\\_ANO\\2006\\AN2006-05RP-RWD.wpd

RIV:RI:DRP/E

RI:DRP/E

SRI:DRP/E

C:DRS/OB

CHYoung

JEJosey

RWDeese

ATGody

T-JAC

T-JAC

T-JAC

/RA/

2/5/2007

2/5/2007

2/5/2007

2/4/2007

C:DRS/PSB

C:DRS/EB1

C:DRS/EB2

C:DRP/E

MPShannon

WBJones

LJSmith

JAClark

/RA/

/RA/

/RA/

/RA/

2/5/2007

2/1/2007

2/1/2007

2/14/2007

OFFICIAL RECORD COPY

T=Telephone E=E-mail F=Fax

-1-

Enclosure

U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

Dockets:

50-313, 50-368

Licenses:

DPR-51, NPF-6

Report:

05000313/2006005 and 05000368/2006005

Licensee:

Entergy Operations, Inc.

Facility:

Arkansas Nuclear One, Units 1 and 2

Location:

Junction of Hwy. 64W and Hwy. 333 South

Russellville, Arkansas

Dates:

September 24 through December 31, 2006

Inspectors:

L. Carson II, Senior Health Physicist, Plant Support Branch

R. Deese, Senior Resident Inspector

J. Josey, Resident Inspector

J. Kirkland, Project Engineer

R. Lantz, Senior Emergency Preparedness Inspector

D. Livermore, Senior Project Engineer

C. Paulk, Senior Reactor Inspector

C. Young, Resident Inspector

Accompanying

Personnel:

S. Makor, Reactor Inspector

Approved By:

Jeffrey A. Clark, Chief, Project Branch E

Division of Reactor Projects

-2-

Enclosure

TABLE OF CONTENTS

SUMMARY OF FINDINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

1R01

Adverse Weather Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

1R02

Evaluation of Changes, Tests, or Experiments . . . . . . . . . . . . . . . . . . . . . . . . . 7

1R04

Equipment Alignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

1R05

Fire Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

1R07

Heat Sink Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

1R08

Inservice Inspection Activities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

1R11

Licensed Operator Requalification Program . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

1R12

Maintenance Effectiveness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

1R13

Maintenance Risk Assessments and Emergent Work Control . . . . . . . . . . . . . 14

1R15

Operability Evaluations

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

1R17

Permanent Plant Modifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

1R19

Postmaintenance Testing

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

1R20

Refueling and Outage Activities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18

1R22

Surveillance Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

1EP4

Emergency Action Level and Emergency Plan Changes . . . . . . . . . . . . . . . . . 22

1EP6

Drill Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

RADIATION SAFETY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

2OS1 Access Control To Radiologically Significant Areas . . . . . . . . . . . . . . . . . . . . . 23

OTHER ACTIVITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24

4OA1 PI Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24

4OA2 Identification and Resolution of Problems . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

4OA3 Followup of Events and Notices of Enforcement Discretion . . . . . . . . . . . . . . 28

4OA5 Other Activities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

4OA6 Meetings, Including Exit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31

SUPPLEMENTAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1

KEY POINTS OF CONTACT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1

LIST OF DOCUMENTS REVIEWED

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-2

LIST OF ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-9

-3-

Enclosure

SUMMARY OF FINDINGS

IR 05000313/2006005, 05000368/2006005; 09/24/2006 - 12/31/2006; Arkansas Nuclear One,

Units 1 and 2; Fire Protection, Operability Evaluations, Refueling and Outage Activities, Follow-

up of Events and Notices of Enforcement Discretion.

This report covered a 3-month period of inspection by resident and regional specialist

inspectors. Five Green findings, three of which were noncited violations were identified. The

significance of most findings is indicated by their color (Green, White, Yellow, or Red) using

Inspection Manual Chapter 0609, Significance Determination Process. Findings for which the

significance determination process does not apply may be Green or be assigned a severity

level after NRC management's review. The NRCs program for overseeing the safe operation

of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight

Process, Revision 3, dated July 2000.

A.

NRC-Identified and Self-Revealing Findings

Cornerstone: Initiating Events

Green. A self-revealing noncited violation of Unit 2 Technical Specification 6.4.1.c, Fire Protection Program Implementation, was identified for

the failure of maintenance personnel to follow Procedure EN-DC-127, Control of

Hot Work and Ignition Sources, while performing hot work. Specifically, the

licensee failed to ensure that combustible material within 35 feet of the work area

was removed or protected. Consequently, torch cutting activities near the Unit 2

containment sump strainer caused a nearby plastic bag containing used

protective clothing to ignite. This issue was entered into the licensee's

corrective action program as Condition Reports ANO-2-2006-1565 and Condition

Report ANO-2-2006-1701. A number of additional examples of hot work

activities that involved inadequate implementation of applicable hot work control

procedures were also identified.

The finding is greater than minor because it is associated with the protection

against external factors attribute of the initiating events cornerstone, and it

directly affects the cornerstone objective to limit the likelihood of those events

that upset plant stability and challenge critical safety functions during shutdown

as well as power operations. Additionally, if left uncorrected, the practice of

conducting hot work in a manner that results in unintended combustion of nearby

materials would become a more significant safety concern in that it could result

in a fire in or near other risk important equipment. The finding is not suitable for

evaluation with the significance determination process neither the fire protection

significance determination process nor the shutdown operations significance

determination process address shutdown fire protection findings. However, the

finding is determined to be of very low safety significance by NRC managements

review because the finding occurred while the unit was already in a cold

shutdown condition, and the operability of equipment necessary to maintain safe

-4-

Enclosure

shutdown was not challenged. The cause of the finding is related to the

crosscutting element of human performance associated with work practices

because the fire watch failed to use error prevention techniques like self

checking and peer checking which would have prevented the event

(Section 1R05).

Green. A self-revealing noncited violation of Unit 2 Technical Specification 6.4.1.a, Procedures, was identified when an operator failed to

close Valve 2DCH-11, resin sluice header drain valve, when securing from a

resin transfer as required by procedure. One week later, while aligning the plant

for alternate purification with Valve 2DCH-11 being out of position, an

unanticipated loss of approximately 230 gallons of reactor coolant system

inventory occurred. This issue was entered into the licensee's corrective action

program as Condition Report ANO-2-2006-1464.

The finding was determined to be more than minor because it affected the

configuration control attribute of the initiating events cornerstone objective to limit

the likelihood of those events that upset plant stability and challenge critical

safety functions during shutdown as well as power operations. Using the

shutdown operations significance determination process, the finding was

determined to have very low safety significance because the finding did not

result in a loss of 2 feet or more of reactor coolant system inventory and did not

result in a loss of reactor coolant system inventory while in reduced inventory.

The cause of the finding is related to the crosscutting element of human

performance associated with work practices because the operator failed to use

error prevention techniques like self checking and peer checking which would

have prevented the event (Section 1R20).

Green. A self-revealing finding was identified associated with the licensees

practice of using a hammer to remove the main hook pin on the Unit 2 polar

crane. Specifically, the license failure to provide clear guidance and training

resulted in station personnel cold working by the main hook and load cell pins

and this practice resulted in both pins being deformed and not usable with

reactor vessel level lowered to just below reactor vessel flange level. As a result,

Unit 2 was exposed to an increased period of elevated likelihood of a loss of

decay heat removal while the unit remained in a lowered vessel level condition

for an additional unplanned 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br />. This issue was entered into the licensee's

corrective action program as Condition Report ANO-2-2006-1553.

The finding was determined to be more than minor because it affected the

equipment performance attribute of the initiating events cornerstone objective to

limit the likelihood of those events that upset plant stability and challenge critical

safety functions during shutdown as well as power operations. This finding was

determined to be a finding of very low safety significance using the shutdown

operations significance determination process because the event did not involve

a loss of shutdown control or a reduction in mitigation capability which would

have increased the frequency of occurrence of a loss of decay heat removal.

-5-

Enclosure

The cause of this finding is related to the crosscutting element of human

performance associated with resources because the training of personnel and

procedural guidance available was adequate (Section 1R20).

Green. A self-revealing finding was identified when the Unit 1 main feedwater

Pump A tripped, resulting in a plant run back to 40 percent reactor power. The

trip occurred due to electromagnetic interference from an air conditioning unit

recently installed on top of the main feedwater pump cabinet. This interference

caused an overspeed trip signal on the digital speed monitor for the main

feedwater pump turbine when no such actual condition occurred. This issue was

entered into the licensee's corrective action program as Condition

Report ANO-1-2006-1399.

The finding was determined to be more than minor because it affected the

design control attribute of the initiating events cornerstone objective to limit the

likelihood of those events that upset plant stability and challenge critical safety

functions during shutdown as well as power operations. Using Manual

Chapter 0609, Significance Determination Process, Phase 1 Worksheet, the

finding is determined to have very low safety significance because the condition

only affected the initiating events cornerstone and did not contribute to both the

likelihood of a reactor trip and the likelihood that mitigation equipment or

functions will not be available. The finding had crosscutting aspects in the area

of problem identification and resolution associated with operating experience

because the licensees failure to implement and institutionalize OE through

changes to station processes and procedures (Section 4OA3).

Cornerstone: Mitigating Systems

Green. A self-revealing noncited violation of ANO Unit 2 License

Condition 2.C.(3)(b), Fire Protection, was identified for failure of the licensee to

maintain the lube oil collection system for Reactor Coolant Pumps C and D in an

operable condition. Specifically, the licensee failed to perform a modification on

the motor installed on Reactor Coolant Pump C which resulted in the oil

collection tank and its associated overfill berm being filled with water from the

component cooling water system. This issue was entered into the licensee's

corrective action program as Condition Report ANO-2-2006-1407.

The finding was determined to be more than minor because it affected the

protection against external factors attribute of the mitigating systems cornerstone

objective to ensure the availability, reliability, and capability of systems that

respond to initiating events to prevent undesirable consequences. Using the fire

protection significance determination process, the finding is determined to have

very low safety significance because the condition constituted a low degradation

of a fire prevention and administrative controls feature (Section 1R15).

B.

Licensee-Identified Violations

None.

-6-

Enclosure

REPORT DETAILS

Summary of Plant Status

Unit 1 began the inspection period at 100 percent rated thermal power (RTP) and remained

there until November 9, 2006, when a trip of the Main Feedwater Pump A occurred due to a

malfunction associated with the electronic overspeed trip device. The trip resulted in an

automatic runback to 40 percent RTP. Unit 1 returned to 100 percent RTP on

November 10 and remained there for the remainder of the inspection period.

Unit 2 began the inspection period with the reactor shut down for Refueling Outage 2R18.

Following the refueling outage, the Unit 2 reactor achieved criticality on October 27 and main

generator output breakers were closed on October 28. Approximately 67 percent RTP was

achieved on October 30 when the unit performed a Technical Specification (TS) required

shutdown to hot standby in response to a fire in 480-volt Motor-Control Center 2B-53. Unit 2

was restarted, and main generator output breakers were closed on November 1. The unit

achieved 100 percent RTP on November 3 and remained there for the remainder of the

inspection period.

1.

REACTOR SAFETY

Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity

1R01

Adverse Weather Protection (71111.01)

.1

Readiness for Impending Adverse Weather Conditions

On November 30 the inspectors completed a review of the licensee's readiness for

impending adverse weather involving icy weather. The inspectors: (1) reviewed plant

procedures, the Updated Final Safety Analysis Reports (UFSAR), and TSs to ensure

that operator actions defined in adverse weather procedures maintained the readiness

of essential systems; (2) walked down portions of the below listed two systems to

ensure that adverse weather protection features (heat tracing, space heaters,

weatherized enclosures, temporary chillers) were sufficient to support operability,

including the ability to perform safe shutdown functions; (3) reviewed maintenance

records to determine that applicable surveillance requirements were current before the

anticipated ice storm developed; and (4) reviewed plant modifications, procedure

revisions, and operator work arounds to determine if recent facility changes challenged

plant operation.

C

November 30, 2006, Units 1 and 2, offsite electrical distribution systems

Documents reviewed by the inspectors are listed in the attachment.

The inspectors completed one sample.

-7-

Enclosure

1R02

Evaluation of Changes, Tests, or Experiments (71111.02)

a.

Inspection Scope

The inspectors reviewed the effectiveness of the licensees implementation of changes

to the facility structures, systems, and components (SSCs); risk-significant normal and

emergency operating procedures; test programs; and the UFSAR in accordance with

10 CFR 50.59, Changes, Tests, and Experiments. The inspectors reviewed the safety

evaluations performed by the licensee dealing with the Unit 2 pressurizer replacement.

The evaluations were reviewed to verify that licensee personnel had appropriately

considered the conditions under which the licensee may make changes to the facility or

procedures or conduct tests or experiments without prior NRC approval. Procedures,

evaluations, screenings, and applicability determinations reviewed are listed in the

attachment to this report.

b.

Findings

No findings of significance were identified.

1R04

Equipment Alignment (71111.04)

.1

Partial Walkdown

The inspectors: (1) walked down portions of the two below listed risk important systems

and reviewed plant procedures and documents to verify that critical portions of the

selected systems were correctly aligned, and (2) compared deficiencies identified during

the walkdown to the licensees UFSAR and corrective action program (CAP) to ensure

problems were being identified and corrected.

October 3, 2006, Unit 1, Emergency Diesel Generator (EDG) K-4A

December 13, 2006, Unit 1, reactor building spray system Train A

Documents reviewed by the inspectors are listed in the attachment.

The inspectors completed two samples.

b.

Findings

No findings of significance were identified.

1R05

Fire Protection (71111.05)

.1

Quarterly Inspection

The inspectors walked down the six below listed plant areas to assess the material

condition of active and passive fire protection features and their operational lineup and

readiness. The inspectors: (1) verified that transient combustibles and hot work

activities were controlled in accordance with plant procedures; (2) observed the

condition of fire detection devices to verify they remained functional; (3) observed fire

-8-

Enclosure

suppression systems to verify they remained functional and that access to manual

actuators was unobstructed; (4) verified that fire extinguishers and hose stations were

provided at their designated locations and that they were in a satisfactory condition;

(5) verified that passive fire protection features (electrical raceway barriers, fire doors,

fire dampers steel fire proofing, penetration seals, and oil collection systems) were in a

satisfactory material condition; (6) verified that adequate compensatory measures were

established for degraded or inoperable fire protection features and that the

compensatory measures were commensurate with the significance of the deficiency;

and (7) reviewed the UFSAR to determine if the licensee identified and corrected fire

protection problems.

September 25, 2006, Unit 2, Fire Zone 2032-K, containment building (south side)

October 17, 2006, Unit 1, Fire Zone 98-J, EDG access corridor

December 13, 2006, Unit 1, Fire Zones 4-EE, 12-EE, and 14-EE, Elevation 317

feet of the auxiliary building, west decay heat removal pump room

December 26, 2006, Unit 2, Fire Zone 2040-JJ, access corridor; charging pump;

radwaste and boron management system area

December 27, 2006, Unit 1, Fire Zone 67-U, lab and demineralizer access area

December 27, 2006, Unit 1, Fire Zone 79-U, upper north piping penetration room

Documents reviewed by the inspectors are listed in the attachment.

The inspectors completed six samples.

b.

Findings

Introduction. A self-revealing, Green noncited violation of TS 6.4.1.c was identified for

the licensees failure to adequately implement their procedure for the control of hot work

and ignition sources while performing hot work activities.

Description. On September 25, 2006, hot work activities were being performed on the

Unit 2 containment sump strainer. A plastic bag was being utilized at a nearby step-off

pad at the high contamination area boundary as a receptacle for used protective

clothing. While torch cutting on the west containment sump strainer door was in

progress, sparks from the activity caused the plastic bag to ignite. The inspectors

identified the fire to the firewatch, who was in the vicinity. The bag was extinguished by

smothering soon thereafter by the workers that were involved in the hot work activity.

Procedure EN-DC-127, Control of Hot Work and Ignition Sources, Revision 2, requires

that combustible material within 35 feet of the work area that could become ignited from

the hot work shall be removed or protected. Procedure EN-DC-127, Attachment 9.1,

Hot Work Permit, was issued for this activity and showed that this requirement to be

checked off by the hot work supervisor as being completed. The inspectors noted that

the bag was within 35 feet of the work area and had not been removed.

-9-

Enclosure

Corrective actions that were taken by the licensee in response to this event to prevent

recurrence included: moving the step-off pad farther away from the work area, clearing

the area near the door of unnecessary equipment and materials, coaching the firewatch

and his supervisor concerning the responsibility of the firewatch and how to deal with

distractions, discussing alternatives to more effectively contain sparks from the cutting

operation, discussing the event with craft personnel, and conducting more frequent area

inspections.

A number of additional deficiencies were identified through a review of recent licensee

performance in the conduct of related hot work activities. Section 4OA2 of this

enclosure contains some details of other instances that occurred during the Unit 2

Refueling Outage 2R18. Also, three examples involving circumstances similar to the

subject of this finding occurred during the prior refueling outages for each of the two

units. On March 25, 2005, fallen welding slag caused the smoldering of debris below

Containment Cooler D inside the Unit 2 containment building. On September 29 torch

cutting resulted in falling hot metal and slag that caused combustible materials in the

work area to catch on fire. On October 14 three small fires of trash bags containing

combustible materials in the Unit 1 turbine building basement were caused by hot work

activities that were being performed on the levels above. There was no firewatch posted

on the basement level.

Each of these instances was entered into the licensees CAP. These occurrences

represent instances of inadequate implementation of applicable hot work control

procedures. The inspectors concluded that the recent increase in the number of related

findings when compared to past occurrences represented a trend which, if left

uncorrected, could become a more significant safety concern in that it could result in a

fire in or near risk important equipment.

Analysis. The performance deficiency associated with this finding involved the failure of

maintenance personnel to adequately implement the licensees procedure for control of

hot work and ignition sources. The finding is greater than minor because it is

associated with the protection against external factors attribute of the initiating events

cornerstone, and affects the cornerstone objective to limit the likelihood of those events

that upset plant stability and challenge critical safety functions during shutdown as well

as power operations. Additionally, if left uncorrected, the practice of conducting hot

work in a manner that results in unintended combustion of nearby materials would

become a more significant safety concern in that it could result in a fire in or near risk

important equipment. Manual Chapter (MC) 0609, Significance Determination

Process, Appendix F, Fire Protection Significance Determination Process, does not

address the potential risk significance of shutdown fire protection findings. Additionally,

MC 0609, Appendix G, Shutdown Operations Significance Determination Process,

does not address fire protection findings. Thus, the finding is not suitable for

significance determination process evaluation, but has been reviewed by NRC

management and is determined to be of very low safety significance because the finding

occurred while the unit was already in a cold shutdown condition; and the operability of

equipment necessary to maintain safe shutdown was not challenged. The cause of the

finding is related to the crosscutting element of human performance in that maintenance

personnel failed to follow procedures.

-10-

Enclosure

Enforcement. Unit 2 TS 6.4, Procedures, requires that written procedures be

established, implemented, and maintained covering fire protection program

implementation. Procedure EN-DC-127, Control of Hot Work and Ignition Sources, is

one of those procedures and requires that combustible material within 35 feet of the

work area that could become ignited from the hot work shall be removed or protected.

Contrary to this, on September 25, 2006, maintenance personnel failed to remove or

protect combustible material within 35 feet of the work area. Because the finding is of

very low safety significance and has been entered into the licensees CAP as Condition

Reports (CRs) ANO-2-2006-1565 and CR ANO-2-2006-1701, this violation is being

treated as an NCV consistent with Section VIA of the Enforcement Policy:

NCV 05000368/2006005-01, Fire During Hot Work Activities on the Containment Sump

Strainer.

1R07

Heat Sink Performance (71111.07)

a.

Inspection Scope

The inspectors reviewed licensee programs, verified performance against industry

standards, and reviewed critical operating parameters and maintenance records for the

Unit 1 EDG A cooling water heat exchanger. The inspectors verified that:

(1) performance tests were satisfactorily conducted for heat enchanters/heat sinks and

reviewed for problems or errors; (2) the licensee utilized the periodic maintenance

method outlined in EPRI NP-7552, Heat Exchanger Performance Monitoring

Guidelines; (3) the licensee properly utilized befalling controls; (4) the licensees heat

exchanger inspections adequately assessed the state of cleanliness of their tubes; and

(5) the heat exchanger was correctly categorized under the Maintenance Rule.

September 5, 2006, Unit 1 EDG A cooling water heat exchanger

Documents reviewed by the inspectors are listed in the attachment.

The inspectors completed one sample.

b.

Findings

No findings of significance were identified.

1R08

Inservice Inspection Activities (71111.08)

Inspection Procedure 71111.08 requires four samples size as identified in

Sections 02.01, 02.02, 02.03, and 02.04.

-11-

Enclosure

a.

Inspection Scope

.1

Performance of Nondestructive Examination (NDE) Activities Other than Steam

Generator Tube Inspections, Pressurized Water Reactor (PWR) Vessel Upper Head

Penetration Inspections, Boric Acid Corrosion Control

The inspection procedure requires the review of NDE activities consisting of two or three

different types (i.e., volumetric, surface, or visual). The inspectors observed the

performance of three ultrasonic examinations (volumetric) (one on a section of service

water piping for wall thickness and two on field welds in the pressurizer spray line). The

inspectors also reviewed the radiographic examinations (volumetric) of the two spray

line welds. (The welds are identified in the attachment to this report.)

For each of the observed NDE activities, the inspectors verified that the examinations

were performed in accordance with the specific site procedures and the applicable

American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME

Code) requirements.

During review of each examination, the inspectors verified that appropriate

NDE procedures were used, examinations and conditions were as specified in the

procedure, and test instrumentation or equipment was properly calibrated and within the

allowable calibration period. The inspectors also verified the NDE certifications of the

personnel who performed the above volumetric examinations. Finally, the inspectors

observed that indications identified during the radiographic examinations were

dispositioned in accordance with the ASME Code-qualified NDE procedures used to

perform the examinations.

The inspection procedure requires review of one or two examinations with recordable

indications that were accepted for continued service to ensure that the disposition was

made in accordance with the ASME Code. The inspectors were informed that no

indications exceeding ASME Code allowables were known to be in service.

The inspection procedure further requires verification of one to three welds on Class 1

or 2 pressure boundary piping to ensure that the welding process and welding

examinations were performed in accordance with the ASME Code. The inspectors

observed welding performed on a safety injection system valve in the prefabrication

shop. The inspectors verified that the welding was performed in accordance with

Sections IX and XI of the ASME Code. This included review of welding material issue

slips to establish that the appropriate welding materials had been used and verification

that the welding procedure specification (WPS E-P8-T-A8,Ar, Manual Gas Tungsten

Arc Welding (GTAW) of P-No. 8 Stainless Steels, Revision 0) had been properly

qualified.

The inspectors completed the one sample required by Section 02.01.

.2

Reactor Vessel Upper Head Penetration Inspection Activities

The inspection requirements for this section parallel the inspection requirement steps in

Section 02.01. The inspectors observed the NDEs on nine reactor vessel upper head

-12-

Enclosure

penetrations. There were eight control element drive mechanism penetrations (Nos. 12,

21, 58, 59, 60, 61, 72, and 79) and one incore instrumentation penetration (No. 82).

The inspectors verified that the nondestructive activities were performed in accordance

with the requirements of NRC Order EA-03-009. The NDEs performed during the NRC

inspection did not reveal any defects or indications.

The inspectors completed the one sample required by Section 02.02.

.3

Boric Acid Corrosion Control Inspection Activities (PWRs)

The inspectors evaluated the implementation of the licensees boric acid corrosion

control program for monitoring degradation of those systems that could be deleteriously

affected by boric acid corrosion. The inspection procedure requires review of a sample

of boric acid corrosion control walkdown visual examination activities through either

direct observation or record review. The inspectors reviewed the documentation

associated with the licensees boric acid corrosion control walkdown. Additionally, the

inspectors performed independent observations of piping containing boric acid during

walkdowns of the containment building and the auxiliary building.

The inspection procedure requires verification that visual inspections emphasize

locations where boric acid leaks can cause degradation of safety significant

components. The inspectors verified through direct observation and program/record

review that the licensees boric acid corrosion control inspection efforts are directed

towards locations where boric acid leaks can cause degradation of safety-related

components.

The inspection procedure requires both a review of one to three engineering evaluations

performed for boric acid leaks found on reactor coolant system (RCS) piping and

components and one to three corrective actions performed for identified boric acid

leaks. The licensee had identified a boric acid leak on the containment spray header

during an inspection for materials that could come loose and clog the sump screens

during a loss-of-coolant accident or steam line rupture inside containment. The

inspectors reviewed the licensees analysis of the condition to evaluate the assessment

of the condition and proposed corrective actions.

The inspectors completed the one sample required by Section 02.03.

.4

Steam Generator Tube Inspection Activities

There were no steam generator tube inspections performed during this outage. The

inspectors reviewed Evaluation ER-2005-0469-001, Operational Assessment of ANO-2

Steam Generator Tubing for Cycles 18-20, dated August 31, 2006. The evaluation

concluded that no tube examinations were required to be performed during

Cycles 18-20. The inspectors noted that the basis was the condition of the tubes from

the previous inspections that were performed after the steam generators were replaced.

This sample was not completed because there was no activity to observe.

-13-

Enclosure

.5

Identification and Resolution of Problems

The inspection procedure requires review of a sample of problems associated with

inservice inspections documented by the licensee in the CAP for appropriateness of the

corrective actions. The inspectors reviewed three CRs, which dealt with inservice

inspection and welding activities. From this review, the inspectors concluded that the

licensee has an appropriate threshold for entering issues into the CAP and has

procedures that direct a root cause evaluation when necessary. The licensee also had

an effective program for applying industry operating experience.

b.

Findings

No findings of significance were identified.

1R11

Licensed Operator Requalification Program (71111.11)

a.

Inspection Scope

On December 14, 2006, the inspectors observed testing and training of Unit 1 senior

reactor operators and reactor operators to identify deficiencies and discrepancies in the

training, to assess operator performance, and to assess the evaluator's critique. The

training was a simulator training scenario.

Documents reviewed by the inspectors included:

ANO Unit 1 Dynamic Exam Scenario SES-1-008, Revision 5

The inspectors completed one sample.

b.

Findings

No findings of significance were identified.

1R12

Maintenance Effectiveness (71111.12)

a.

Inspection Scope

The inspectors reviewed the two below listed maintenance activities to: (1) verify the

appropriate handling of SSCs performance or condition problems; (2) verify the

appropriate handling of degraded SSC functional performance; (3) evaluate the role of

work practices and common cause problems; and (4) evaluate the handling of SSC

issues reviewed under the requirements of the Maintenance Rule, 10 CFR Part 50,

Appendix B, and TSs.

November 28, 2006, Unit 1, turbine building ventilation

December 5, 2006, Unit 2, 480-volt electrical distribution

Documents reviewed by the inspectors are listed in the attachment.

-14-

Enclosure

The inspectors completed two samples.

b.

Findings

No findings of significance were identified.

1R13

Maintenance Risk Assessments and Emergent Work Control (71111.13)

.1

Risk Assessment and Management of Risk

a.

Inspection Scope

Risk Assessment and Management of Risk

The inspectors reviewed the six below listed assessment activities to verify:

(1) performance of risk assessments when required by 10 CFR 50.65 (a)(4) and

licensee procedures prior to changes in plant configuration for maintenance activities

and plant operations; (2) the accuracy, adequacy, and completeness of the information

considered in the risk assessment; (3) that the licensee recognizes, and/or enters as

applicable, the appropriate licensee-established risk category according to the risk

assessment results and licensee procedures; and (4) that the licensee identified and

corrected problems related to maintenance risk assessments.

September 19 through October 27, 2006, Unit 2, pressurizer replacement

September 19 through October 27, 2006, Unit 2, containment sump modification

November 13-17, 2006, Unit 1, planned maintenance for the week

November 27 through December 1, 2006, Unit 1, planned maintenance for the

week

December 4-8, 2006, Unit 2, planned maintenance for the week

December 11-15, 2006, Unit 1, planned maintenance for the week

Documents reviewed by the inspectors are listed in the attachment.

The inspectors completed six samples.

b.

Findings

No findings of significance were identified.

-15-

Enclosure

1R15

Operability Evaluations (71111.15)

a.

Inspection Scope

The inspectors: (1) reviewed plants status documents, such as operator shift logs,

emergent work documentation, deferred modifications, and standing orders, to

determine if an operability evaluation was warranted for degraded components;

(2) referred to the UFSAR and design basis documents to review the technical

adequacy of licensee operability evaluations; (3) evaluated compensatory measures

associated with operability evaluations; (4) determined degraded component impact on

any TSs; (5) used the significance determination process to evaluate the risk

significance of degraded or inoperable equipment; and (6) verified that the licensee has

identified and implemented appropriate corrective actions associated with degraded

components.

September 22, 2006, Unit 2, reactor coolant pump (RCP) oil collection system

October 3, 2006, Unit 2, Electrical Bus 2B-5

October 28, 2006, Unit 2, containment spray header

December 19, 2006, Unit 2, containment sump

Documents reviewed by the inspectors are listed in the attachment.

The inspectors completed four samples.

b.

Findings

Introduction. A Green self-revealing noncited violation of the Unit 2 license condition for

fire protection was identified for failure of the licensee to maintain the RCP oil collection

system for RCPs C and D in an operable condition. Specifically, the licensee failed to

perform a modification on the motor installed on RCP C, which resulted in the oil

collection tank and its associated overfill berm filling up and overflowing with water from

the component cooling water (CCW) system.

Description. On September 20, 2006, while the licensee was conducting a hot

shutdown walkdown in containment during the start of Refueling Outage 2R18, the

licensee discovered that the RCP oil collection system drain tank for RCPs C and D,

(2T-110) and its associated overfill berm were filled and overflowing with water. The

licensee determined that the drain tank and associated berm were inoperable because

the licensee could not perform their intended function of providing a collection and

holding point for possible oil leakage from RCPs C and D.

The licensee obtained a sample of the water and determined that it was from the CCW

system. Based on this, the licensee then identified and performed inspections of all

interface points of the CCW system with the RCP oil collection system. During this

inspection, two leakage points were identified: the outlet flange of lube oil

Cooler 2E-25D, and the interface of the threaded supply and return piping nipples for

the lower bearing oil cooler on RCP C. The leakage from the lower bearing oil cooler

was determined to be the source that was leaking into the oil collection system through

the drip pans below the motor.

-16-

Enclosure

During their investigation to determine the cause of this failure, the licensee identified

the cause of the leakage to be fatigue at the root diameter of the threaded schedule

40 pipe nipple. They also determined that this type of failure had previously occurred on

the motor installed on RCP B in December of 1995. This failure was documented in

CR ANO-2-1995-0555 and was also determined to be due to fatigue at the root diameter

of the threaded schedule 40 pipe nipple. The licensee determined, during their review

of the RCP B failure of December 1995, that Modification PEAR 9-0330, Revision 1, had

been developed and implemented to replace the schedule 40 threaded pipe nipple on

the RCPs with schedule 80 threaded pipe nipples. This modification was performed on

the motors of all installed RCPs but not the Unit 2 spare motor. Completion of the

modification on the spare RCP motor was to be accomplished during motor

refurbishment; however, the modification was never performed. In 2005 during

Refueling Outage 2R17, the spare RCP motor was installed as the RPC C motor without

the modification.

In reviewing this issue, the inspectors noted that the licensee had trend data for the

volume of oil in RCPs C and D which indicated that oil volume in RCPs C and D had

gone down over the cycle. The inspectors determined through interviews that this oil

was not contained in the oil collection system or the overflow berm as per design but

had most likely overflowed the berm and gone to the containment sump via the floor

drain system. During the operating cycle, the sump had been pumped to the auxiliary

building for processing.

Analysis. The inspectors determined that the failure to maintain the oil collection system

drain tank for RCPs C and D in an operable condition was a performance deficiency.

The finding was determined to be more than minor because it affected the protection

against external factors attribute of the mitigating systems cornerstone objective to

ensure the availability, reliability, and capability of systems that respond to initiating

events to prevent undesirable consequences. Using MC 0609, Significance

Determination Process, Phase 1 Worksheet, the finding is assumed to degrade fire

protection defense-in-depth strategies involving barriers; therefore, the significance of

the finding is determined by using Appendix F, Fire Protection Significance

Determination Process, of MC 0609. Using the Phase 1 Worksheet of Appendix F, the

inspectors assumed the condition represented a low degradation of the fire prevention

and administrative controls category since the oil collection would have kept oil from

contacting hot surfaces in the containment building. Additionally, the inspectors

assumed that no intervening combustibles were present between the overflow path and

adjacent fire areas and that the containment sump, to which the floor drains installed in

the area of the berm transported any oil that overflowed, lacked a significant ignition

source.

Enforcement. ANO Unit 2 License Condition 2.C.(3)(b), Fire Protection, states, in part,

that the licensee shall implement and maintain all provisions of the approved fire

protection program. ANO Unit 1 and Unit 2 - Fire Hazards Analysis, Revision 9, is part

of the ANO Unit 2 fire protection program. Section 6.4.5, Fire Barriers, Seals, and

Penetrations, of the Fire Hazards Analysis states, in part, that the fire barrier system at

ANO has been designed to ensure that fires will be confined or adequately retarded

from spreading to adjacent portions of the facility. Contrary to this, the filling to overflow

of the oil collection system tank and overflow berm with water from the CCW system

-17-

Enclosure

during Operating Cycle 18 prevented a potential RCP oil fire in the containment

basement from being confined per the fire protection program. Because the finding is of

very low safety significance and has been entered into the licensees CAP as

CR ANO-2-2006-1407, this violation is being treated as an NCV consistent with

Section VIA of the Enforcement Policy: NCV 05000368/2006005-02, Failure to Perform

Modification Resulted in an Inoperable RCP Oil Collection System.

1R17

Permanent Plant Modifications (71111.17)

.1

Annual Review

The inspectors reviewed key affected parameters associated with energy needs,

materials/replacement components, timing, heat removal, control signals, equipment

protection from hazards, operations, flowpaths, pressure boundary, ventilation

boundary, structural, process medium properties, licensing basis, and failure modes for

the modification listed below. The inspectors verified that: (1) modification preparation,

staging, and implementation does not impair emergency/abnormal operating procedure

actions, key safety functions, or operator response to loss of key safety functions;

(2) postmodification testing maintained the plant in a safe configuration during testing by

verifying that unintended system interactions will not occur, SSC performance

characteristics still meet the design basis, the appropriateness of modification design

assumptions, and the modification test acceptance criteria has been met; and (3) the

licensee has identified and implemented appropriate corrective actions associated with

permanent plant modifications.

September 19 through October 26, 2006, Unit 2, pressurizer replacement

1R19

Postmaintenance Testing (71111.19)

a.

Inspection Scope

The inspectors selected the six below listed postmaintenance test activities of risk

significant systems or components. For each item, the inspectors: (1) reviewed the

applicable licensing basis and/or design-basis documents to determine the safety

functions; (2) evaluated the safety functions that may have been affected by the

maintenance activity; and (3) reviewed the test procedure to ensure it adequately tested

the safety function that may have been affected. The inspectors either witnessed or

reviewed test data to verify that acceptance criteria were met, plant impacts were

evaluated, test equipment was calibrated, procedures were followed, jumpers were

properly controlled, the test data results were complete and accurate, the test

equipment was removed, the system was properly realigned, and deficiencies during

testing were documented. The inspectors also reviewed the UFSAR to determine if the

licensee identified and corrected problems related to postmaintenance testing.

October 17, 2006, Unit 1, Emergency Feedwater Pump P-7A

October 22, 2006, Unit 2, pressurizer heater capacity

October 24, 2006, Unit 2, replacement pressurizer relief valve monitor test

-18-

Enclosure

October 25, 2006, Unit 2, containment spray header repairs

October 27, 2006, Unit 2, replacement pressurizer leakage

November 1, 2006, Unit 2, containment building personnel hatch leakage rate

testing

Documents reviewed by the inspectors are listed in the attachment.

The inspectors completed six samples.

b.

Findings

No findings of significance were identified.

1R20

Refueling and Outage Activities (71111.20)

1.

Unit 2 Forced Outage Caused by Fire in Motor Control Center 2B-53

a.

Inspection Scope

The inspectors reviewed the following risk significant outage activities to verify defense

in depth commensurate with the outage risk control plan and compliance with the TSs:

(1) the risk control plan, (2) tagging/clearance activities, (3) heatup and cooldown

activities, and (4) restart activities.

The inspectors completed one sample.

b.

Findings

No findings of significance were identified.

2.

Refueling and Pressurizer Replacement Outage 2R18

a.

Inspection Scope

The inspectors reviewed the following risk significant refueling items or outage activities

to verify defense in depth commensurate with the outage risk control plan, compliance

with the TSs, and adherence to commitments in response to Generic Letter 88-17, Loss

of Decay Heat Removal: (1) the risk control plan, (2) tagging/clearance activities,

(3) RCS instrumentation, (4) electrical power, (5) decay heat removal, (6) spent fuel pool

cooling, (7) inventory control, (8) reactivity control, (9) containment closure, (10) reduced

inventory conditions, (11) refueling activities, (12) heatup and cooldown activities,

(13) restart activities, and (14) licensee identification and implementation of appropriate

corrective actions associated with refueling and outage activities. The inspectors

containment inspections included observation of the containment sump for damage and

debris, supports, braces, and snubbers for evidence of excessive stress, water hammer,

or aging.

-19-

Enclosure

The inspectors completed one sample.

b.

Findings

.1

Inadvertent RCS Draining While in Mode 5

Introduction. A Green self-revealing noncited violation of the licensees TS requirement

for procedures was identified when an operator failed to close a resin sluice header

drain valve as required by procedure. Later, while operators were aligning the unit for

alternate reactor coolant purification, a loss of approximately 230 gallons of RCS

inventory occurred.

Description. On September 14, 2006, operations personnel performed

Procedure OP-2104.019, Clean Resin Transfer, to add clean resin to Purification Ion

Exchanger 2T-36B. During this procedure, Valve 2DCH-11 was opened as part of the

system lineup. Subsequently, when the evolution was completed and the plant lineup

was being restored, station personnel failed to properly perform Step 22.2 of the

procedure leaving Valve 2DCH-11 in the open position.

Subsequently, on September 21, 2006, with Unit 2 in Mode 5, the licensee was in the

process of aligning alternate purification in accordance with Procedure OP-2104.004,

Shutdown Cooling System, Attachment J, Alternate Purification. When Step 2.11 of

this procedure was performed, the control room operators noted that pressurizer level

began to lower. The evolution was stopped and the lineup was secured. At this point,

pressurizer level stopped lowering. Station personnel performed a system walkdown

and discovered that Valve 2DCH-11 was in the open position. Operations personnel

determined that approximately 230 gallons were drained from the RCS through the open

valve.

During their review, the inspectors noted that Procedure OP-2104.004, Attachment J,

directed personnel to prepare a caution tag for components to prevent the loss of RCS

inventory. However, the procedure contained a note that preceded Step 1.11 which

directed the caution tag be hung on the room door instead of Valve 2DCH-11 and two

other valves. This tag stated that, since the valves were normally closed, any

misalignment would be detected by system abnormalities. The inspectors determined

that this note contributed to Valve 2DCH-11 not being discovered out of position prior to

initiating alternate purification since the licensee did not perform a valve lineup

verification.

Analysis. The failure of station personnel to manipulate Valve 2DCH-11 in accordance

with station procedure was determined to be a performance deficiency. The finding was

determined to be more than minor because it affected the configuration control attribute

of the initiating events cornerstone objective to limit the likelihood of those events that

upset plant stability and challenge critical safety functions during shutdown as well as

power operations. The inspectors used MC 0609, Significance Determination Process,

Appendix G, Shutdown Operations Significance Determination Process, and assumed

that the administrative controls implemented to avoid operations that could lead to

perturbations in RCS level control attribute was affected. The finding was determined to

have very low safety significance because the finding did not result in a loss of 2 feet or

-20-

Enclosure

more of RCS inventory and did not result in a loss of RCS inventory while the unit was in

reduced inventory. The cause of the finding is related to the crosscutting aspect of

human performance associated with work practices because the operator failed to use

error prevention techniques like self checking and peer checking which would have

prevented the event.

Enforcement. Unit 2 TS, Section 6.4.1.a, Procedures, requires, in part, that written

procedures shall be established, implemented, and maintained covering the applicable

procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A,

February 1978. Procedure OP-2104.019, Clean Resin Transfer, is a procedure

required by Regulatory Guide 1.33. Contrary to the above, on September 14, 2006, the

licensee failed to fully implement Procedure OP-2104.019, Clean Resin Transfer,

when the licensee failed to close Valve 2DCH-11. Because this finding is of very low

safety significance and has been entered into the CAP as CR ANO-2-2006-1464, this

violation is being treated as an NCV, consistent with Section VIA of the NRC

Enforcement Policy: NCV 05000368/2006005-03, Inadvertent RCS Draining While in

Mode 5.

.2

Unplanned Increase in Time with Reactor Vessel Water Level at Flange Level

Introduction. A Green self-revealing finding was identified associated with the licensees

use of a hammer to remove and reinstall both the main hook pin and the load cell pin on

the Unit 2 polar crane. Unit 2 was maintained in a condition with reactor vessel water

level being maintained just below the reactor vessel flange for an additional unplanned

27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> when the pins could not be used due to deformation by the hammer.

Description. On September 24, 2006, station personnel were preparing the Unit 2 polar

crane for the reactor vessel closure head removal. This involved removing the normally

installed main hook, installing a load cell, and then reinstalling the main hook. During

performance of Procedure OP-2504.005, Reactor Vessel Closure Head Removal,

Revision 12, Step 7.22, licensee personnel were unable to easily remove the polar crane

main hook pin. After the pin was removed, it was examined by the licensee and

discovered to be mushroomed at one end. When the licensee inspected the pin used to

secure the load cell into place, it was discovered to be in the same condition. The

licensee determined this condition to be caused by the practice of using a hammer, as

necessary, to both remove and install the pins during previous refueling outages.

The inspectors noted that the licensee did not have a formal procedure that controlled

the removal and installation of the pins, and that station personnel were controlling this

evolution as a skill-of-the-craft process. A review of the applicable procedures by the

inspectors revealed that Procedure OP-2504.005, Step 7.22, Reactor Vessel Closure

Head Removal, simply states, Verify that the load cell is attached to the polar crane.

The inspectors also determined that the use of hammers was a common practice being

used to remove and reinstall the pins on the polar crane, and there was no existing

evaluation for the effects of this on the integrity of the pins. The inspectors determined

that the lack of adequate procedural direction and the practice of hammering the pins in

and out directly contributed to the deformation of the pins. Finally, the inspectors were

informed by licensee personnel that the practice of using hammers to remove the pins

-21-

Enclosure

was not part of the formal training received by maintenance personnel; however, in at

least one instance, a discussion between instructors and maintenance personnel

outside the formal lesson plan had occurred describing the practice of using hammers

as being acceptable.

Analysis. The inspectors determined that the licensees failure to provide clear guidance

and training on how to remove the main hook and load cell pins without causing damage

was a performance deficiency. The finding was determined to be more than minor

because it affected the equipment performance attribute of the initiating events

cornerstone objective to limit the likelihood of those events that upset plant stability and

challenge critical safety functions during shutdown as well as power operations. The

inspectors evaluated the finding using MC 0609, Significance Determination Process,

Appendix G, Shutdown Operations Significance Determination Process. The

inspectors determined that the finding was not a loss of shutdown control as defined by

MC 0609, Appendix G, Table 1, and then evaluated the issue using Checklist 3 of

MC 0609, Appendix G, Attachment 1. The inspectors determined that a quantitative

analysis was not required because the event did not represent a reduction in mitigation

capability which would have increased the frequency of occurrence of a loss of decay

heat removal. Therefore, the finding was determined to have very low safety

significance. The cause of the finding is related to the crosscutting element of human

performance associated with resources because the training of personnel and

procedural guidance available was adequate.

Enforcement. While a performance deficiency was identified, there were no violations of

NRC requirements identified during the review of this issue. The licensee has entered

this issue into the CAP as CR ANO-2-2006-1553: Finding (FIN)05000368/2006005-04,

Unplanned Increase in Time with Reactor Vessel Water Level at Flange Level.

1R22

Surveillance Testing (71111.22)

a.

Inspection Scope

The inspectors reviewed the UFSAR, procedure requirements, and TSs to ensure that

the four below listed surveillance activities demonstrated that the SSCs tested were

capable of performing their intended safety functions. The inspectors either witnessed

or reviewed test data to verify that the following significant surveillance test attributes

were adequate: (1) preconditioning; (2) evaluation of testing impact on the plant;

(3) acceptance criteria; (4) test equipment; (5) procedures; (6) jumper/lifted lead

controls; (7) test data; (8) testing frequency and method demonstrated TS operability;

(9) test equipment removal; (10) restoration of plant systems; (11) fulfillment of ASME

Code requirements; (12) updating of performance indicator (PI) data; (13) engineering

evaluations, root causes, and bases for returning tested SSCs not meeting the test

acceptance criteria were correct; (14) reference setting data; and (15) annunciators and

alarms setpoints. The inspectors also verified that the licensee identified and

implemented any needed corrective actions associated with the surveillance testing.

August 4, 2006, Unit 1, makeup system Valve MU-36A local leak rate test

October 5, 2006, Unit 2, main steam safety valve lifts (inservice test)

October 15, 2006, Unit 2, Valve 2SV-8271-2 local leak rate test

-22-

Enclosure

October 23, 2006, Unit 2, Containment Cooler A

Documents reviewed by the inspectors are listed in the attachment.

The inspectors completed four samples.

b.

Findings

No findings of significance were identified.

Cornerstone: Emergency Preparedness

1EP4

Emergency Action Level and Emergency Plan Changes (71114.04)

a.

Inspection Scope

The inspector performed an in-office review of Revision 037-05-0 to Emergency Plan

Implementing Procedure OP-1903.010, Emergency Action Level Classification. The

revision was submitted in October 2006. The revision corrected emergency plan

guidance for transient event classification and notification practices at Arkansas Nuclear

One and was a corrective action for the NCV 05000313,368/2006003-02, Failure to

Meet Immediate Notification Requirements during Transient Events.

The revision was compared to the previous revision, to the criteria of NUREG-0654,

Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and

Preparedness in Support of Nuclear Power Plants, Revision 1; and NEI 99-01,

Methodology for Development of Emergency Action Levels, Revision 2; and to the

standards in 10 CFR 50.47(b) to determine if the revision was adequately conducted

following the requirements of 10 CFR 50.54(q). This review was not documented in a

safety evaluation report and did not constitute approval of licensee changes, therefore,

the revision is subject to future inspection.

The inspector completed one sample during the inspection.

b.

Findings

No findings of significance were identified.

1EP6

Drill Evaluation (71114.06)

a.

Inspection Scope

For the one below listed simulator-based training evolutions contributing to drill/exercise

performance, emergency response organization, and PIs, the inspectors: (1) observed

the training evolution to identify any weaknesses and deficiencies in classification,

notification, and protective action requirements (PAR) development activities;

(2) compared the identified weaknesses and deficiencies against licensee identified

-23-

Enclosure

findings to determine whether the licensee is properly identifying failures;

and (3) determined whether licensee performance is in accordance with the guidance of

the NEI 99-02, Voluntary Submission of Performance Indicator Data, acceptance

criteria.

December 7, 2006, Unit 2, simulator-based exercise requiring notice of unusual

event and alert declarations

Documents reviewed by the inspectors are listed in the attachment.

The inspectors completed one sample.

b.

Findings

No findings of significance were identified.

2.

RADIATION SAFETY

Cornerstone: Occupational Radiation Safety

2OS1 Access Control To Radiologically Significant Areas (71121.01)

a.

Inspection Scope

This area was inspected to assess the licensees performance in implementing physical

and administrative controls for airborne radioactivity areas, radiation areas, high

radiation areas, and worker adherence to these controls. The inspectors used the

requirements in 10 CFR Part 20, the TSs, and the licensees procedures required by

TSs as criteria for determining compliance. During the inspection, the inspectors

interviewed the radiation protection manager, radiation protection supervisors, and

radiation workers. The inspectors performed independent radiation dose rate

measurements and reviewed the following items:

PI events and associated documentation packages reported by the licensee in

the occupational radiation safety cornerstone

Controls (surveys, posting, and barricades) of radiation, high radiation, or

airborne radioactivity areas

Radiation work permits, procedures, engineering controls, and air sampler

locations

Conformity of electronic personal dosimeter alarm set points with survey

indications and plant policy; workers knowledge of required actions when their

electronic personnel dosimeter noticeably malfunctions or alarms

Barrier integrity and performance of engineering controls in airborne radioactivity

areas

Adequacy of the licensees internal dose assessment for any actual internal

exposure greater than 50 millirem committed effective dose equivalent

-24-

Enclosure

Physical and programmatic controls for highly activated or contaminated

materials (nonfuel) stored within spent fuel and other storage pools

Self-assessments related to the access control program since the last

inspection; there were no audits, licensee event reports, and special reports

documented.

Corrective action documents related to access controls

Licensee actions in cases of repetitive deficiencies or significant individual

deficiencies

Radiation work permit briefings and worker instructions

Adequacy of radiological controls such as, required surveys, radiation protection

job coverage, and contamination controls during job performance

Dosimetry placement in high radiation work areas with significant dose rate

gradients

Changes in licensee procedural controls of high dose rate - high radiation areas

and very high radiation areas

Controls for special areas that have the potential to become very high radiation

areas during certain plant operations

Posting and locking of entrances to all accessible high dose rate - high radiation

areas and very high radiation areas

Radiation worker and radiation protection technician performance with respect to

radiation protection work requirements

The inspectors completed 21 of the required 21 samples.

b.

Findings

No findings of significance were identified.

4.

OTHER ACTIVITIES

4OA1 PI Verification (71151)

.1

Occupational Radiation Safety Cornerstone

a.

Inspection Scope

The inspectors reviewed licensee documents from April through September 2006. The

review included corrective action documentation that identified occurrences in locked high

radiation areas (as defined in the licensees TSs, very high radiation areas (as defined in

10 CFR 20.1003), and unplanned personnel exposures (as defined in NEI 99-02).

Additional records reviewed included as low as reasonably achievable records and whole

body counts of selected individual exposures. The inspectors interviewed licensee

-25-

Enclosure

personnel that were accountable for collecting and evaluating the PI data. In addition, the

inspector toured plant areas to verify that high radiation, locked high radiation, and very

high radiation areas were properly controlled. PI definitions and guidance contained in

NEI 99-02, Regulatory Assessment Indicator Guideline, Revision 4, were used to verify

the basis in reporting for each data element.

Occupational Exposure Control Effectiveness

The inspectors completed the required sample (1) in this cornerstone

b.

Findings

No findings of significance were identified.

.2

Public Radiation Safety Cornerstone

a.

Inspection Scope

The inspectors reviewed licensee documents from April through September 2006.

Licensee records reviewed included corrective action documentation that identified

occurrences for liquid or gaseous effluent releases that exceeded PI thresholds and those

reported to the NRC. The inspectors interviewed licensee personnel that were

accountable for collecting and evaluating the PI data. PI definitions and guidance

contained in NEI 99-02, Regulatory Assessment Indicator Guideline, Revision 4, were

used to verify the basis in reporting for each data element.

Radiological Effluent TS/Offsite Dose Calculation Manual Radiological Effluent

Occurrences

The inspectors completed the required sample (1) in this cornerstone

b.

Findings

No findings of significance were identified.

4OA2 Identification and Resolution of Problems (71152)

.1

Routine Review of Identification and Resolution of Problems

The inspectors performed a daily screening of items entered into the licensees CAP.

This assessment was accomplished by reviewing CRs and attending corrective action

review and work control meetings. The inspectors: (1) verified that equipment, human

performance, and program issues were being identified by the licensee at an appropriate

threshold and that the issues were entered into the CAP; (2) verified that corrective

actions were commensurate with the significance of the issue; and (3) identified conditions

that might warrant additional follow-up through other baseline inspection procedures.

.2

Selected Issue Follow-up Inspection

In addition to the routine review, the inspectors selected the two below listed issues for a

more in-depth review. The inspectors considered the following during the review of the

licensees actions: (1) complete and accurate identification of the problem in a timely

-26-

Enclosure

manner; (2) evaluation and disposition of operability/reportability issues; (3) consideration

of extent of condition, generic implications, common cause, and previous occurrences;

(4) classification and prioritization of the resolution of the problem; (5) identification of root

and contributing causes of the problem; (6) identification of corrective actions;

and (7) completion of corrective actions in a timely manner.

September 20, 2006, Unit 2, repeat occurrence of containment purge isolation

October 30, 2006, Unit 2, repeat occurrence of improper electrical connections in

motor-control centers

When evaluating the effectiveness of the licensees corrective actions for these issues,

the following attributes were considered:

Complete and accurate identification of the problem in a timely manner

commensurate with its significance and ease of discovery

Evaluation and disposition of operability and reportability issues

Consideration of extent of condition, generic implications, common cause, and

previous occurrences

Classification and prioritization of the resolution of the problem commensurate with

its safety significance

Identification of root and contributing causes of the problem for significant

conditions adverse to quality

Identification of corrective actions which are appropriately focused to correct the

problem

Completion of corrective actions in a timely manner commensurate with the safety

significance of the issue

Documents reviewed by the inspectors are listed in the attachment

.3

Semiannual Trend Review

a.

Inspection Scope

The inspectors completed a semi-annual trend review of repetitive or closely related

issues that were documented in corrective action documents to identify trends that might

indicate the existence of more safety-significant issues. The inspectors' review consisted

of the 6-month period of June 24 through December 31, 2006. When warranted, some of

the samples expanded beyond those dates to fully assess the issue. The inspectors also

reviewed CAP items associated with deficiencies in the conduct of activities involving hot

work. The inspectors compared and contrasted their results with the results contained in

the licensees quarterly trend reports. Corrective actions associated with a sample of the

issues identified in the licensees trend report were reviewed for adequacy. Documents

reviewed by the inspectors are listed in the attachment.

-27-

Enclosure

b.

Findings

During the Unit 2 pressurizer replacement Refueling Outage 2R18 from September 19

through October 28, 2006, several deficiencies were noted involving the conduct of hot

work. Licensee Procedure EN-DC-127, Control of Hot Work and Ignition Sources,

contains the governing guidelines for the conduct of hot work, including Hot Work

Permit, Attachment 8.1, which serves to document that the applicable requirements for

each activity involving hot work are met. Examples of instances resulting from failures to

adequately implement the control of hot work procedure included:

On September 24, 2006, welding activities being conducted on the Unit 2 main

condenser manway cover resulted in paint/crud smoldering that was extinguished

with a portable fire extinguisher.

On September 25, 2006, sparks from torch cutting of the Unit 2 containment sump

strainer ignited a nearby plastic bag containing used anti-contamination clothing.

On September 26, 2006, a substantial amount of slag from the containment sump

strainer torch cutting flowed down onto a fire blanket that was protecting the floor

and caused the fire blanket to ignite.

On September 27, 2006, slag from the containment sump strainer torch cutting

flowed down through a fire blanket and landed on Valve 2BS-38 in the containment

sump. The slag came in contact with debris buildup on the valve locking chain and

began to smoke and smolder. A portable fire extinguisher was discharged to

extinguish the smoldering.

On September 28, 2006, the firewatch posted for the containment sump strainer

hot work could not get to his designated fire extinguisher. The firewatch had

moved to the east side of the sump and the extinguisher remained on the west

side of the sump.

On October 5, 2006, a small fire in the Unit 2 containment building basement

below the pressurizer was extinguished by the assigned firewatch using a portable

extinguisher.

On October 16, 2006, welding and grinding activities above the replacement

pressurizer were being performed without proper protection to prevent sparks from

traveling down the cavity below.

The licensee entered each of these occurrences into their CAP.

.4

Access Control to Radiologically Significant Areas

Section 2OS1 evaluated the effectiveness of the licensee's problem identification and

resolution processes regarding access controls to radiologically significant areas and

radiation worker practices. The inspectors reviewed corrective action documents for root

cause/apparent cause analysis against the licensees problem identification and resolution

process. No findings of significance were identified.

-28-

Enclosure

4OA3 Follow-up of Events and Notices of Enforcement Discretion (71153)

a.

Inspection Scope

The inspectors: (1) reviewed operator logs, plant computer data, and/or strip charts for

the below listed evolutions to evaluate operator performance in coping with nonroutine

events and transients; (2) verified that operator actions were in accordance with the

response required by plant procedures and training; and (3) verified that the licensee has

identified and implemented appropriate corrective actions associated with personnel

performance problems that occurred during the nonroutine evolutions sampled.

October 26, 2006, Unit 1, fish intrusion into the circulating water system

October 30, 2006, Unit 2, fire in Motor-Control Center 2B-53

November 9, 2006, Unit 1, unplanned loss of Main Feedwater Pump P-2A

Documents reviewed by the inspectors are listed in the attachment.

The inspectors completed three samples.

b.

Findings

Introduction. A Green self-revealing finding was identified when the licensee replaced an

air conditioning unit for the Unit 1 Main Feedwater Pump (MFP) A control cabinet without

considering the effects of electromagnetic interference (EMI) on the digital speed

monitor (DSM) housed in the cabinet. Consequently, MFP A tripped, resulting in an

unplanned automatic plant power reduction from 100 percent to 40 percent RTP.

Description. In September 2006 the air conditioning unit for the Unit 1 MFP A cabinet

failed. During the procurement phase of replacement efforts, the station discovered that

the current air conditioning unit was no longer available because it had become obsolete.

The licensee contacted the cabinet manufacturer who recommended to the licensee a

replacement unit. On October 12 the licensee replaced the air conditioning unit with the

recommended replacement after evaluating it as being an equivalent unit in accordance

with Procedure EN-DC-313, Procurement Engineering Process, Revision 0.

Subsequently, on November 9, 2006, while Unit 1 was operating at 100 percent RTP

MFP A tripped, which caused the integrated control system to initiate and perform an

unplanned automatic power reduction to 40 percent RTP. Operators surveyed the

indications and concluded that the cause of the MFP trip was an overspeed condition;

however, at the time of the trip, there were no indications that the MFP had actually

experienced an overspeed.

After extensive troubleshooting, the licensee suspected that EMI from the air conditioning

unit was the cause of the faults. The licensee performed a review of the new air

conditioning unit and identified that the bottom section of the new unit was molded plastic

and not metal like the previous unit. They also discovered the configuration of this new

unit placed the blower fan directly above, and in closer proximity to, the DSM than did that

of the previous air conditioning unit. The licensee decided to remove power to the air

conditioning unit to verify that it was the initiator of the faults in the DSM. With power to

the air conditioning unit removed, the faults and trips did not recur.

-29-

Enclosure

The inspectors reviewed the licensees root cause evaluation of this event, documented in

CR ANO-1-2006-1399, which determined the root cause to be that the procurement

engineering equivalency guidelines did not consider EMI as a potential failure mode.

During this review, the inspectors noted that the licensee had not questioned or

investigated any of the differences between the old and the new air conditioning units.

Instead, the licensee had relied on the manufacturers designation that the new unit was

an equivalent replacement for the old unit.

Also, during their review of the root cause analysis, the inspectors noted that there had

been previous experiences with the MFP A control system involving EMI, as well as a

substantial amount of industry operating experience concerning the topic of EMI and

digital components. During interviews with station personnel, the inspectors also

determined that station engineers received specific training on EMI related to digital

components.

Analysis. The inspectors determined that the failure of the licensee to adequately

evaluate the new air conditioning unit with respect to design differences and possible

EMI interactions was a performance deficiency. The finding was determined to be more

than minor because it affected the design control attribute of the initiating events

cornerstone objective to limit the likelihood of those events that upset plant stability and

challenge critical safety functions during shutdown as well as power operations. Using the

MC 0609, Significance Determination Process, Phase 1 Worksheet, the finding is

determined to have very low safety significance because the condition only affected the

initiating events cornerstone and did not contribute to both the likelihood of a reactor trip

and the likelihood that mitigation equipment or functions will not be available. The cause

of the finding is related to the crosscutting element of problem identification and resolution

associated with operating experience because the licensees failure to implement and

institutionalize OE through changes to station processes and procedures.

Enforcement. While a performance deficiency was identified with regard to the trip of the

MFP A, there were no violations identified during the review of this issue. The licensee

has entered this issue into the CAP as CR ANO-1-2006-1399: FIN 05000313/2006005-5,

Trip of a MFP Due to Inadequate Design Control.

4OA5 Other Activities

.1

(Closed) Temporary Instruction (TI) 2515/169, Mitigating Systems Performance

Index (MSPI) Verification

a.

Inspection Scope

During this inspection period, the inspectors completed a review of the licensees

implementation of the MSPI in accordance with the guidance provided in TI 2515/169.

The review examined the licensees MSPI Basis Documents (ANO1-A-6-0001, Revision 1,

and ANO2-SA-06-00001, Revision 0) and verified the established system boundaries and

monitored components were consistent with guidance provided in NEI 99-02, Reactor

Oversight Process Performance Indicators, Revision 4. The inspectors verified that the

licensee did not include credit for unavailability hours for short term unavailability or

operator recovery actions to restore the risk-significant function as is allowed by

NEI 99-02.

-30-

Enclosure

Additionally, the inspectors reviewed the baseline MSPI unavailability time using plant

specific values for the period of 2002 through 2004. The verification included all planned

and unplanned unavailability. For Unit 1, the inspectors reviewed the baseline MSPI

unreliability data using plant specific values for the period of 2002 through 2004. Unit 2

derived its baseline unreliability on industry standard values, as is permitted by NEI 99-02.

The plant specific data for 2005 through 2006 were also reviewed to ensure the licensee

properly accounted for the actual unavailability hours of MSPI systems. For the same

period, the MSPI component unreliability data was examined to ensure the licensee

identified all failures of monitored components. The accuracy and completeness of the

reported unavailability and unreliability data was verified by reviewing operating logs, CRs,

and work order documents. The unavailability and unreliability data was compared with PI

data submitted to the NRC to ensure that any discrepancies would not result in a change

to the index color.

b.

Findings

No findings of significance were identified. This completes the inspection requirements

for this TI.

.2

Institute of Nuclear Power Operations Plant Assessment Report Review

a.

Inspection Scope

The inspectors reviewed the final report for the Institute of Nuclear Power Operations

plant assessment of Arkansas Nuclear One, Units 1 and 2, conducted in July and

August 2006. The inspectors reviewed the report to ensure that issues identified were

consistent with the NRC perspectives of licensee performance and to verify if any

significant safety issues were identified that required further NRC followup.

b.

Findings

No findings of significance were identified.

.3

(Closed) Unresolved Item (URI)05000313/2006003-01, Failure to Retrieve Required

Records of Activities Affecting Quality

In response to inspectors questioning the seismic capability of the Tendon Surveillance

Cranes L-28 on Unit 1, the licensee could not locate the appropriate documentation. The

licensee evaluated the as found conditions of the cranes against the uniformed building

code. The licensee concluded that the cranes would be able to withstand the design

basis earthquake without affecting mitigating equipment. These evaluations were

reviewed by the inspectors. No findings of significance were identified, and no violations

of NRC requirements were identified. The licensee documented the evaluations

demonstrating the seismic qualification in CR ANO-1-2005-3109. This unresolved

item (URI) is closed.

-31-

Enclosure

.4

NRC TI 2515/166, PWR Containment Sump Blockage

The inspectors reviewed ANOs Unit 2 implementation of plant modifications and

procedure changes committed to in their response to Generic Letter 2004-02, Potential

Impact of Debris on Emergency Recirculation During Design Basis Accidents at

Pressurized Water Reactors.

The inspectors observed installation of the containment recirculation sump strainers,

debris barriers, and interceptors. In addition, the inspectors verified that ANO Unit 2 has

implemented specific procedure changes to control tags, labels, tape, and other objects

inside the containment building.

At the time of the inspection, industry testing for chemical effects on containment

recirculation sumps was not complete. Since the testing was not complete, ANO Unit 2

evaluated the new recirculation sump modifications to the original design basis,

Regulatory Guide 1.82, Water Sources for Long-Term Recirculation Cooling Following a

Loss-of-Coolant Accident, Revision 0. Final review and acceptance of the modification

will be performed by the Office of Nuclear Reactor Regulation at a later date.

4OA6 Meetings, Including Exit

On October 6, 2006, the inspectors presented the access controls inspection results to

Mr. T. Mitchell, General Manager and other members of his staff who acknowledged the

findings. The inspectors confirmed that proprietary information was not provided or

examined during the inspection.

The engineering inspectors presented the results of the inservice inspection review to

Mr. J. Kowalewski, Director, Engineering, on October 10, 2006. Mr. Kowalewski

acknowledged the inspection findings. The engineering inspector conducted a followup

exit with Mr. T. Mitchell, General Manager, Plant Operations, on December 4, 2006, to

provide updated information on the documentation associated with the review of the

containment sump modification. The inspectors identified that they had not reviewed

proprietary information.

On November 1, 2006, the inspector presented the results of the emergency plan change

inspection to Mr. R. Holeyfield, Supervisor, Emergency Preparedness. The inspector

confirmed that proprietary information was not provided or examined during the

inspection.

The resident inspectors presented the inspection results of the resident inspections to

Mr. J. Forbes, Vice President, Operations, and other members of the licensee's

management staff on January 17, 2007. The resident inspectors conducted a followup

exit with Mr. J. Forbes, Vice President, Operations, on February 8, 2007. The licensee

acknowledged the findings presented. The inspectors noted that while proprietary

information was reviewed, none would be included in this report.

ATTACHMENT: SUPPLEMENTAL INFORMATION

A-1

Attachment

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

R. Barnes, Manager, Planning, Scheduling, and Outages

S. Bennett, Project Manager, Licensing

B. Berryman, Manager, Operations Unit 1

J. Browning, Manager, Operations Unit 2

S. Cotton, Manager, Training

B. Daiber, Supervisor, Systems Engineering

J. Eichenberger, Manager, Corrective Actions and Assessments

J. Forbes, Vice President, Operations

R. Fowler, Emergency Planner

R. Freeman, Emergency Planner

J. Giles, Manager, Technical Support

M. Ginsberg, Supervisor, Engineering Programs and Components

R. Gresham, Emergency Planner

D. Harris, Emergency Planner

A. Hawkins, Licensing Specialist

J. Hoffpauir, Manager, Maintenance

R. Holeyfield, Manager, Emergency Planning

M. Huff, Supervisor, Project Engineering

D. James, Manager, Licensing

W. James, Manager, Engineering Projects

J. Kowalewski, Director, Engineering

T. Marlow, Director, Nuclear Safety Assurance

J. Miller, Jr., Manager, System Engineering

T. Mitchell, General Manager, Plant Operations

D. Moore, Manager, Radiation Protection

K. Panther, Nondestructive Examination Site Level III

C. Reasoner, Manager, Engineering Programs and Components

C. Tyrone, Manager, Quality Assurance

F. Van Buskirk, Licensing Specialist

D. White, Emergency Planner

P. Williams, Supervisor, Systems Engineering

M. Woodby, Manager, Design Engineering

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Opened and Closed

05000368/2006005-01

NCV

Fire During Hot Work Activities on the Containment Sump

Strainer (Section 1R05)05000368/2006005-02

NCV

Failure to Perform Modification Resulted in an Inoperable

RCP Oil Collection System (Section 1R15)

A-2

Attachment

05000368/2006005-03

NCV

Inadvertent RCS Draining While in Mode 5 (Section 1R20)05000368/2006005-04

FIN

Unplanned Increase in Time with Reactor Vessel Water Level

at Flange Level (Section 1R20)05000313/2006005-05

FIN

Trip of a MFP Due to Inadequate Design Control

(Section 4OA3)

Closed

05000313/2006003-01

URI

Failure to Retrieve Required Records of Activities Affecting

Quality (Section 4OA5)

Discussed

None

LIST OF DOCUMENTS REVIEWED

In addition to the documents referred to in the inspection report, the following documents were

selected and reviewed by the inspectors to accomplish the objectives and scope of the inspection

and to support any findings:

Section 1R01: Adverse Weather Protection

NUMBER

TITLE

REVISION

OP-2203.008

Natural Emergencies

9

OP-1203.025

Natural Emergencies

20

Section 1R02: Evaluation of Changes, Tests, or Experiments

Engineering Requests

NUMBER

TITLE

REVISION

ER-ANO-2002-0836-003

Pressurizer Replacement

1

ER-ANO-2002-0836-004

Original Pressurizer Removal / Replacement

Pressurizer Installation

1

ER-ANO-2002-0836-020

Replacement Pressurizer Heater Electrical Design

Input

0

A-3

Attachment

Section 1R04: Equipment Alignment

Procedures

NUMBER

TITLE

REVISION

OP-1104.036

Emergency Diesel Generator Operations

45

Op-1107.002

ES Electrical System Operations

23

OP-1104.005

Reactor Building Spray System Operation

46

Section 1R05: Fire Protection

Plant Drawings

FZ-1038, Sheet 1, Revision 2

FZ-2018, Sheet 1, Revision 2

Procedures

NUMBER

TITLE

REVISION

Arkansas Nuclear One Fire Hazards Analysis

11

PFP-U1

ANO Prefire Plan (Unit 1) - Section 1B-357-67-U.doc,

Section 1B-354-79-U.doc

2

PFP-U2

ANO Prefire Plan (Unit 2) - Section 2B-335-2040-

JJ.doc

2

EN-DC-127

Control of Hot Work and Ignition Sources

2

CRs

ANO-1-2005-0950

ANO-1-2005-1397

ANO-2-2005-1724

ANO-2-2006-1565

ANO-2-2006-1701

Section 1R07: Heat Sink Performance

NUMBER

TITLE

REVISION

ULD-1-SYS-01

ANO-1 Emergency Diesel Generator (EDG) System

4

ULD-1-SYS-10

ANO-1 Service Water Systems

13

SPEC-6600-M-012

Emergency Diesel Generators for ANO Unit 1

1

ER-ANO-2004-0663-000

2004 Unit 1 EDG Thermal Test Results

0

ER-980310

EDG Coolers, E-20A/B, Service Water Flow

Requirements

CALC-91-R-2013-01

Service Water Performance Testing Methodology

14

A-4

Attachment

OP-1309.018

EDG Cooler Thermal Test

Change 004-02-0

Section 1R08: Inservice Inspection (71111.08P)

CRs:

ANO-2-2005-0916

ANO-2-2006-1208

ANO-C-2006-1733

NDEs

REPORT

COMPONENT/LOCATION

METHOD

BOP-RT-06-055

FW-50 (WDR-40631) Drawing No. 2CCA-15-1, Sheet 1

Radiographic

BOP-RT-06-056

FW-51 (WDR-40632) Drawing No. 2CCA-15-1, Sheet 1

Radiographic

ISI-UT-06-033

2-73-SWS-R-12B-30R, 2HBC-60-1 between FW-52C &

FW-6C1

Automatic

Ultrasonic

ISI-UT-06-040

FW-50 (WDR-40631) Drawing No. 2CCA-15-1, Sheet 1

Ultrasonic

ISI-UT-06-042

FW-51 (WDR-40632) Drawing No. 2CCA-15-1, Sheet 1

Ultrasonic

Procedures

PROCEDURE

TITLE

REVISION

CEP-NDE-0110

Program Section for Certification of NDE Personnel

2

CEP-NDE-0111

Certification of Ultrasonic Personnel in Accordance

with ASME Section XI, Appendix VII

1

CEP-NDE-0400

Ultrasonic Examination

0

CEP-NDE-0404

Manual Ultrasonic Examination of Ferritic Piping

Welds (ASME XI)

1

CEP-NDE-0423

Manual Ultrasonic Examination of Austenitic Piping

Welds (ASME XI)

1

CEP-NDE-0505

Ultrasonic Thickness Examination

3

A-5

Attachment

Welding Procedures/Qualification Records

NUMBER

TITLE

REVISION/

DATE

PQR 107

Manual Gas Tungsten & Shielded Metal Arc

Welding (GTAW & SMAW), P-No. 8, SA-312 Type

304

1

PQR 170

Manual Gas Tungsten & Shielded Metal Arc

Welding (GTAW & SMAW), P-No. 8, SA-240 Type

304

1

WPS E-P8-T-A8,Ar

Manual Gas Tungsten Arc Welding (GTAW) of

P-No. 8 Stainless Steels

0

WPS E-P8-T(M)-A8,Ar

Machine Gas Tungsten Arc Welding (GTAW) of

P-No. 8 Stainless Steels

0

WP 06-121

2T-1 Surge Line

October 3,

2006

Section 1R13: Maintenance Risk Assessments and Emergent Work Control

COPD-024, Risk Assessment Guidelines, Revision 18

Section 1R15: Operability Evaluations

CRs

ANO-2-1995-0555

ANO-2-2006-1407

ANO-2-2006-1433

ANO-2-2006-1459

ANO-2-2006-1478

ANO-2-2006-1521

ANO-2-2006-1522

ANO-2-2006-1539

ANO-2-2006-1757

ANO-2-2006-1796

ANO-2-2006-1853

ANO-2-2006-1879

Procedure

OP-2305.002, Reactor Coolant System Leak Detection, Revision 14

Engineering Requests

ER-ANO-2000-2528-003, ANO Sump Operability when the RCS Temperature is Above 200 F

ER-ANO-2004-0060-000, ANO-2 Sump Operability for the RCS Temperature above 200 F

Miscellaneous Documents

2CNA108802, Safety Evaluation Report, dated October 26, 1988

0CAN088404, Station Letter to USNRC Requesting Exemption, dated August 15, 1984

A-6

Attachment

Section 1R17: Permanent Plant Modifications

Engineering Requests

NUMBER

TITLE

ER-ANO-2002-0836-003

Pressurizer Replacement

ER-ANO-2002-0836-004

Original Pressurizer Removal / Replacement

Pressurizer Installation

ER-ANO-2002-0836-005

Interference Removal / Reinstallation Inside the

Pressurizer Cubicle

ER-ANO-2002-0836-006

Interference Removal / Reinstallation Outside the

Pressurizer Cubicle

ER-ANO-2002-0836-007

ANO-2 Pressurizer Replacement Rigging and

Handling

ER-ANO-2002-0836-020

Replacement Pressurizer Heater Electrical Design

Input

Section 1R20: Refueling and Outage Activities

Procedures

NUMBER

TITLE

REVISION

OP-2104.004

Shutdown Cooling System

031-00-0

OP-2104.019

Clean Resin Transfer

009-01-0

OP-2504.005

Reactor Vessel Closure Head Removal

012-01-0

Miscellaneous Document

Shutdown Operations Protection Plan, dated August 4, 2005

CRs

ANO-2-2006-1464

ANO-2-2006-1553

ANO-2-2006-1573

ANO-2-2006-1734

ANO-2-2006-2032

ANO-C-2006-1473

ANO-C-2006-1678

Section 2OS1: Access Controls to Radiologically Significant Areas

CRs

ANO-1-2006-0479

ANO-1-2006-0700

ANO-1-2006-1113

ANO-2-2005-1429

ANO-2-2006-1434

ANO-2-2006-1446

ANO-2-2006-1471

ANO-2-2006-1495

ANO-2-2006-1497

ANO-2-2006-1501

ANO-2-2006-1511

ANO-2-2006-1523

ANO-2-2006-1568

ANO-2-2006-1568

ANO-2-2006-1575

ANO-2-2006-1598

A-7

Attachment

ANO-2-2006-1606

ANO-2-2006-1636

ANO-2-2006-1638

ANO-2-2006-1671

ANO-2-2006-1674

ANO-2-2006-1675

ANO-2-2006-1695

ANO-2-2006-1696

ANO-2-2006-1716

ANO-2-2006-1717

ANO-2-2006-1748

ANO-2-2006-1765

ANO-2-2006-1774

ANO-2-2006-1790

ANO-C-2006-1698

Audits and Self-Assessments

Self-Assessment Report, QS-2006-ANO-007, 2R18 Radiation Protection Outage Planning

Review

Radiation Work Permits

NUMBER

TITLE

RWP 2006-2420

Scaffold Activities

RWP 2006-2501

Support Activities for Pressurizer Replacement

RWP 2006-2502

Remove and Replace Pressurizer

RWP 2006-2520

Incore Instrument Thimble Tube Replacement

RWP 2005-2530

Sump Screen Modification

RWP 2006-2540

Hot Leg RTD Replacement

Procedures

NUMBER

TITLE

REVISION

1601.209

Whole Body Counting/Bioassay

CHANGE

009-00

EN-RP-104

Personnel Contamination Events

3

EN-RP-108

Radiation Protection Posting

3

EN-RP-131

Air Sampling

1

EN-RP-203

Dose Assessment

0

EN-RP-208

Whole Body Counting and In-Vitro Bioassay

0

PL-182

Radiation Protection Expectations and Standards

1

Miscellaneous Document

Alpha Monitoring Plan, Revised August 22, 2006

A-8

Attachment

Section 4OA2: Identification and Resolution of Problems

CRs

ANO-2-2006-1535

ANO-2-2006-1625

ANO-2-2006-1655

ANO-2-2006-1693

ANO-2-2006-1891

ANO-2-2006-2174

Section 4OA3: Event Follow-up

Procedures

NUMBER

TITLE

REVISION

EN-DC-141

Design Inputs

2

EN-DC-313

Procurement Engineering Process

0

CRs

ANO-1-2006-1399

ANO-2-2006-1464

ANO-2-2006-2444

ANO-2-2006-2449

Section 4OA5: Other Activities (TI 2515/0166)

Safety Evaluation

FFN-06-008, Unit 2 RBS/ECCS Sump Strainer Replacement

A-9

Attachment

LIST OF ACRONYMS

ANO

Arkansas Nuclear One

ASME

American Society of Mechanical Engineers Boiler and Pressure Vessel Code

CAP

corrective action program

CCW

component cooling water

CFR

Code of Federal Regulations

CR

condition report

DSM

digital speed monitor

EDG

emergency diesel generator

EMI

electromagnetic interference

FIN

finding

MC

manual chapter

MFP

main feedwater pump

MSPI

mitigating systems performance index

NCV

noncited violation

NDE

nondestructive examination

PI

performance indicator

PWR

pressurized water reactor

RCP

reactor coolant pump

RCS

reactor coolant system

RTP

rated thermal power

SSCs

system, structure, and components

TI

temporary instruction

TS

Technical Specification

UFSAR

Updated Final Safety Analysis

URI

unresolved item