ML080720485: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:1.2.3.4.5.6.7.ADMINISTRATIVE
{{#Wiki_filter:1.
DOCUMENTS (Yellow Paper)EP.C ES-201-1/'
2.
xam reparation
3.
hecklist./Exam Outline Quality Checklist.
4.
J:>:u=: ES-201-2 Exam Security Agreement(s)
5.
6.
7.
ADMINISTRATIVE DOCUMENTS
(Yellow Paper)
E
P
.
C
ES-201-1/'
xam
reparation
hecklist
.
/
Exam Outline Quality Checklist. J:>:u=:
ES-201-2
Exam Security Agreement(s)
ES-201-3./
ES-201-3./
Administrative
Administrative Topics Outline (Final)
Topics Outline (Final)ES-301-1/
ES-301-1 /
Room Systems&Facility Walk-through
C~ntrol Room Systems & Facility Walk-through Test Outline
Test Outline./(Final)ES-301-2/Operating Test Quality Check Sheet ES-301-3 J Simulator Scenario Quality Check Sheet ES-301-4 8.Transient and Event Checklist.9.Competencies
./
Checklist.10.Written Exam Quality Check Sheet.I ES-301-5/ES-301-6./ES-401-6 11.Written Exam Review Worksheet ES-401-9 12.Written Exam Grading Quality Checklist ES-403-1./13.Post-Exam Check Sheet ES-501-1/'
(Final)
14.Facility Submittal Letter.s (0 SE{}uoyAH
ES-301-2
[]  
/
ES*201ExaminationPreparation
Operating Test Quality Check Sheet
Checklist Form ES*201*1 Facility:<: lVlAO;!rW Date of Examination:
ES-301-3
-:r4-N.
J
Developed by: Written-FacilityNRC 0 II Operating-Facility MNRC 0 Target Chief Date" Task Description (Reference)
Simulator Scenario Quality Check Sheet
ES-301-4
8.
Transient and Event Checklist
.
9.
Competencies Checklist
.
10.
Written Exam Quality Check Sheet
.
I
ES-301-5
/
ES-301-6
.
/
ES-401-6
11.
Written Exam Review Worksheet
ES-401-9
12.
Written Exam Grading Quality Checklist
ES-403-1 ./
13.
Post-Exam Check Sheet
ES-501-1/'
14.
Facility Submittal Letter.s ( 0
SE{}uoyAH
oZO~8-JL)/
[]
~.
 
ES*201
Examination Preparation Checklist
Form ES*201*1
Facility:
<: lVlAO;! rW
Date of Examination: -:r4-N. &'OClC~
Developed by: Written - Facility ~NRC 0
II
Operating - Facility MNRC 0
Target
Chief
Date"
Task Description (Reference)
Examiner's
Examiner's
Initials-180 1.Examinationadministrationdateconfirmed(C.1.a;C.2.aandb)
Initials
IJifS-1202.NRCexaminersandfacilitycontactassigned(C.1.d;C.2.e)-120 3.Facilitycontactbriefedonsecurityandother
-180
requirements (C.2.c)r0kP-120 4.Corporatenotificationlettersent(C.2.d)
1.
y11f>[-90][5.Referencematerialdue(C.1.e;C.3.c;
Examination administration date confirmed (C.1.a; C.2.a and b)
Attachment
IJifS
3)]{-75}6.Integratedexaminationoutline(s)due,includingFormsES-201-2,ES-201-3,ES-301-1,ES-301-2,ES-301-5,ES-O-1's,ES-401-1/2,ES-401-3,andES-401-4,asapplicable(C.1.eandf;C.3.d)
-120
{-70}{7.Examinationoutline(s)reviewedbyNRCand
2.
feedbackprovidedtofacility
NRC examiners and facility contact assigned (C.1.d; C.2.e)
tms licensee(C.2.h;C.3.e)}{-45}8.Proposed examinations(includingwritten, walk-throughJPMs,andscenarios,asapplicable),supporting
r~
documentation(includingForms
-120
m$>ES-301-3,ES-301-4,ES-301-5,ES-301-6,andES-401-6,andanyFormES-201-3updates),andreferencematerialsdue(C.1.e,f,gandh;C.3.d)
3.
-30 9.Preliminarylicenseapplications(NRCForm398's)due (C.1.1;C.2.g;ES-202)-1410.FinallicenseapplicationsdueandFormES-201-4prepared (C.1.1;C.2.i;ES-202)-1411.ExaminationapprovedbyNRC
Facility contact briefed on security and other requirements (C.2.c)
supervisorforfacilitylicenseereview(C.2.h;C.3.f)
r0kP
-14 12.Examinationsreviewedwithfacilitylicensee(C.1.j;C.2.fandh;C.3.g)
-120
'rn!b-7 13.
4.
andapprovedbyNRC
Corporate notification letter sent (C.2.d)
supervisor
y11f>
*(C.2.1;C.3.h)-7 14.Final applicationsreviewed;1or2(if>10)
[-90]
applicationsauditedtoconfirm
[5.
flI4IP qualifications/eligibility;andexaminationapprovalandwaiverletterssent (C.2.i;Attachment5;ES-202,C.2.e;ES-204)
Reference material due (C.1.e; C.3.c; Attachment 3)]
],w-s;..v--et'::,-,,)
!Y~
:2
{-75}
-7 15.Proctoring/writtenexamadministrationguidelinesreviewed
6.
mrswithfacilitylicensee(C.3.k)-716.Approvedscenarios,job
Integrated examination outline(s)due, including Forms ES-201-2, ES-201-3,
performancemeasures,andquestionsdistributedtoNRCexaminers(C.3.i)*Targetdatesare
ES-301-1, ES-301-2, ES-301-5, ES-O-1's, ES-401-1/2, ES-401-3, and
generallybasedonfacility-prepared
~
examinationsandarekeyedtotheexaminationdateidentifiedinthecorporatenotificationletter.Theyareforplanningpurposesandmaybeadjustedonacase-by-casebasisincoordinationwiththefacilitylicensee.[Appliesonly]{Doesnotapply}toexaminationspreparedbytheNRC.ES-201,Page25of28
ES-401-4, as applicable (C.1.e and f; C.3.d)
ES*201ExaminationOutlineQualityChecklist
{-70}
Form ES*201*2 c#b'a'llJ r#b InitialsDateof Examination:
{7.
1/;)..00?:j'
Examination outline(s) reviewed by NRC and feedback provided to facility
tms
licensee (C.2.h; C.3.e)}
{-45}
8.
Proposed examinations (including written, walk-through JPMs, and
scenarios, as applicable), supporting documentation (including Forms
m$>
ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any Form
ES-201-3 updates), and reference materials due (C.1.e, f, g and h; C.3.d)
-30
9.
Preliminary license applications (NRC Form 398's) due (C.1.1; C.2.g;
I~
ES-202)
-14
10.
Final license applications due and Form ES-201-4 prepared (C.1.1; C.2.i;
/I~
ES-202)
-14
11.
Examination approved by NRC supervisor for facility licensee review
;}~
(C.2.h; C.3.f)
-14
12.
Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g)
'rn!b
-7
13.
Writt~n exam~ons and oper~tests approved by NRC supervisor
*
(C.2.1; C.3.h)
-7
14.
Final applications reviewed; 1 or 2 (if >10) applications audited to confirm
flI4IP
qualifications / eligibility; and examination approval and waiver letters sent
(C.2.i; Attachment 5; ES-202, C.2.e; ES-204) ],w-s;..v--et'::,-,,) :2 G..K!~"""'-l.&#xa3;v;....J
-7
15.
Proctoring/written exam administration guidelines reviewed
mrs
with facility licensee (C.3.k)
-7
16. Approved scenarios, job performance measures, and questions
~
distributed to NRC examiners (C.3.i)
* Target dates are generally based on facility-prepared examinations and are keyed to the examination date
identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-
case basis in coordination with the facility licensee.
[Applies only] {Does not apply} to examinations prepared by the NRC.
ES-201, Page 25 of 28
 
ES*201
Examination Outline Quality Checklist
Form ES*201*2
c#
b'
a
~1ZJrwP
~7ZJIMP
-~ 'llJ r#b
Initials
Date of Examination: 1/;)..00?:j'
Task Description
Task Description
d.Assess whether the justifications
d.
for deselectedorrejectedKIA
Assess whether the justifications for deselected or rejected KIA statements are appropriate.
statements
a.
are appropriate.a.Verifythatthe
Verify that the outline(s) fit(s) the appropriate model, in accordance with ESA01.
outline(s)fit(s)the appropriatemodel,in accordance
f--.--*-*--------------------------------+--t-'-~+_~__11
with ESA01.
b.
b.Assess whethertheoutlinewas
Assess whether the outline was systematically and randomly prepared in accordance with
systematically
--2..,,:cOon 0.1 of ES-401 ar:.d whether all KIA cateqories are appropriately sampled.
and randomlypreparedin
c.
accordance
Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.
with--2..,,:cOon0.1ofES-401
Item
ar:.d whetherallKIA cateqories
I----+-*--------------------------------t-::..-j-..:;:--t-~I
are appropriately
1.
sampled.c.Assess whether the outline over-emphasizes
W
any systems, evolutions, or generic topics.Item
R
1.W R I T T E Nc.Tothe extent possible, assess whether the outline(s)
I
conform(s)withthe qualitative
T
and quantitative
T
criteria specifiedonFormES-301-4and
E
describedinAppendixD.
N
a.Using Form E$-301-5,verifythattheproposed
c.
scenariosetscovertherequired
To the extent possible, assess whether the outline(s) conform(s) with the qualitative
number of normal evolutions, instrument
and quantitative criteria specified on Form ES-301-4 and described in Appendix D.
and component failures, technical specifications,andmajor transients.
a.
Using Form E$-301-5, verify that the proposed scenario sets cover the required number
of normal evolutions, instrument and component failures, technical specifications,
and major transients.
f--*-------------'-----------------------;---;f-<--t---il
f--*-------------'-----------------------;---;f-<--t---il
b.Assess whetherthereareenough
b.
scenariosets(and spares)totesttheprojected
Assess whether there are enough scenario sets (and spares) to test the projected number
numberandmixof applicants
and mix of applicants in accordance with the expected crew composition and rotation schedule
in accordancewiththe expected crew compositionandrotation
without compromising exam integrity, and ensure that each applicant can be tested using
schedule without compromisingexamintegrity,andensurethateach
at least one new or significantly modified scenario, that no scenarios are duplicated
applicantcanbetestedusingatleastonenewor
from the applicants' audit test(s), and that scenarios will not be repeated on subsequent davs.
significantlymodifiedscenario,thatno
2.
scenarios are duplicatedfromthe applicants'audittest(s),andthat
I
scenarioswillnotberepeatedon
M
subsequent
U
davs.2.I M U L A T o R s
L
3 W I Ta.Verifythat
A
the systems walk-throughoutlinemeetsthecriteria
To
specifiedonForm ES-301-2:(1)the outlir&(s)
R
contain(s)therequired
s
numberofcontrolroomandin-planttasks
Ir----I-*--*-~----------------------------_t_-+_-+--_il
distributedamongthesafetyfunctionsas
3
specifiedontheform./'(2)taskrepetitionfromthelasttwoNRCexaminationsiswithinthelimitsspecifiedonthe
W
fonrn......(3)notasksare
I
duplicatedfromthe applicants'
T
audit test(s)./
a.
J fY\tS(4)thenumberof
Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:
flewormodifiedtasksmeetsorexceeds
(1)
theminimumsspecifiedontheform
the outlir&(s) contain(s) the required number of control room and in-plant tasks
,/./!II./I(5)the numberofalternatepath, low-power, emergency,andRCAtasksmeetthe
distributed among the safety functions as specified on the form ./'
criteria.>ontheform.15'1?J ifVIfJ1lJ-j-:)7lJ\\rR>Assess whetherthe10 CFR55,41 143 and 55,45 sampling is appropriate.
(2)
Assess whether theexamfitsthe
task repetition from the last two NRC examinations is within the limits specified on the fonrn ......
appropriatejoblevel(ROorSRO).e.Checktheentireexamfor
(3)
balanceofcoverage.d.Checkfor
no tasks are duplicated from the applicants' audit test(s)./
duplicationandoverlapamongexam
1~."11
sections.b.c.EnsurethatKIA
J fY\\tS
importance
(4)
ratings (except for plant-specific
the number of flew or modified tasks meets or exceeds the minimums specified on the form ,/
priorities)areatleast2.5.
.
G E N E R p., L b.Verifythatthe administrative
/!II./ I
outlinemeetsthecriteria
(5)
specifiedonFormES-301-1:(1)thetasksare
the number of alternate path, low-power, emergency, and RCA tasks meet the criteria.>
distributedamongthetopicsas
on the form.
specifiedontheform ,./(2)atleastonetaskisnewor
-;~tZ..
significantly
Iv~
modified ,./(3)nomorethanonetaskisrepeatedfromthelasttwoNRC
15 '1?J ifVIfJ
licensing examinations
i1'~ 1lJ 1~
./'c.Determineifthereareenough
f0~'iv~
different outlinestotestthe projected numberandmix 0/',..--.-of applicantsandensurethatnoitemsare
-j-:) 7lJ \\\\rR>
duplicated
Assess whether the 10 CFR55,41 143 and 55,45 sampling is appropriate.
on subsequent
Assess whether the exam fits the appropriate job level (RO or SRO).
days.4.R.Assess whether plant-specific
e.
priorities(includingPRAandIPE
Check the entire exam for balance of coverage.
insights)arecoveredinthe appropriate
d.
exam sections.Note: Date j 1/7(t/'8 I
Check for duplication and overlap among exam sections.
Q2/0.4 bM'-, t'-7{l5'I", a.Author b.Facility Reviewer (')c.NRC Chief Examiner (if)d.NRC Supervisor/*II-'
b.
'L#Independent
1-*-*-----------------....:..--:..-..:....:....:....:..-----------j-!:~+"u::.'9-'~-i1
NRC reviewerinitialitemsin
c.
Colbmrr"C";
Ensure that KIA importance ratings (except for plant-specific priorities) are at least 2.5.
ctlref examiner concurrence
G
required.:j,;>:>>.:,c,;c
E
'z....,f<:'.,...,'",.;11;;',;!:>;['
N
:);V,':".E8-201,Page26of28
E
ES-201 Examination
R
Outline Quality Checklist DIll 7 Form ES-201-2 ((Facility:Dateof Examination:
p.,
Initials Item Task Description
L
b*c#a 1.a.Verifythatthe outline(s)
b.
fills)the appropriatemodel,in accordance
Verify that the administrative outline meets the criteria specified on Form ES-301-1:
with ES-401.VW./R b.Assess whether the outline was systematically
(1)
and randomlypreparedin
the tasks are distributed among the topics as specified on the form ,./
accordance
(2)
with-IS.#J....'01{S I Section0.1ofES-401and
at least one task is new or significantly modified ,./
whetherallKiA cateqories
(3)
are appropriately
no more than one task is repeated from the last two NRC licensing examinations ./'
sampled.T Assess whether the outline over-emphasizes
c.
any systems, evolutions, or generic topics.--1)*T c.E d.Assess whether the justifications
Determine if there are enough different outlines to test the projected number and mix
for deselected
0/'
or rejected KiA statements
,..--.-
are appropriate.I-ra)N NJ6 2.a.Using Form ES-301-5,verifythatthe
of applicants and ensure that no items are duplicated on subsequent days.
proposed scenario sets covertherequired
4.
number1Y of normal evolutions, instrument
R.
and component failures, technical specifications, M$Sand major transients.
Assess whether plant-specific priorities (including PRA and IPE insights) are covered
I M b.Assess whetherthereareenough
in the appropriate exam sections.
scenariosets(and spares)totestthe projected number Uandmixof applicants
Note:
in accordancewiththeexpected
Date
crew composition
j 1/7(t/'8
and rotation scheduler1&#xa3;L without compromising
I JI7/~
exam integrity, and ensurethateach applicantcanbetestedusing
Q2 /0.4bM'-,
A at leastonenewor significantly
t'-7{l5'I",
modified scenario,thatno scenarios are duplicated
a. Author
T from the applicants'
b. Facility Reviewer (')
audit testis).andthat scenarios will notberepeatedon
c. NRC Chief Examiner (if)
subsequent
d. NRC Supervisor
days.0 c.Tothe extent possible, assess whether the outline(s)
IJA.II'Fn..l./~\\'''nll.Uf..:,/
conform(s)withthe qualitative
~
p R and quantitative
*
criteriaspecifiedonForm
II-'
ES-301-4 and described in AppendiX2Ctt-tlcn Irv-30'u.hw.A ,'U wl-\'.L ioCe\15E'e
--Ifll.<::~~.,/Y 'L
YIlt!>*td t:S-i-l.I Wa.S""Y\Df-
# Independent NRC reviewer initial items in Colbmrr"C"; ctlref examiner concurrence required.
sLv.u..
:j,; >:>>.:,c,;c 'z... .,f<:'., ... ,'
W(V.[\SI".fL"i-iAS
",.; 11;;',;!:>;['
.3.a.Verifythatthe systems walk-through
:);V,':".
outline meets the criteriaspecifiedonForm
E8-201, Page 26 of 28
ES-301-2:(1)the outline(s)
 
contain(s)
ES-201
the required number of controlroomandin-plant
Examination Outline Quality Checklist
tasks W distributed
DIll
amongthesafety functions as specifiedontheform r<<V/(2)taskrepetitionfromthelasttwoNRC
7
examinationsiswithinthelimitsspecifiedontheform
Form ES-201-2
76 rr T (3)no tasks are duplicatedfromthe applicants'
(
audit testis)(4)thenumberofnewormodifiedtasksmeetsorexceedstheminimumsspecifiedontheform
(
'*(5)the number of altemate path, low-power, emergency,andRCAtasks
Facility:
meetthecriteriaontheform.
Date of Examination:
b.Verifythatthe administrative
Initials
outline meets the criteria specifiedonForm ES-301-1:(1)the tasks are distributed
Item
among the topics as specifiedonthe form 7!J(ff6(2)at leastonetaskisnewor
Task Description
significantly
b*
modified (3)nomorethanonetaskis
c#
repeatedfromthe last two NRC licensinq examinations
a
c.Determine if thereareenough different outlinestotestthe projectednumberandmix
1.
15 ,iJof applicants
a.
and ensurethatno items are duplicated
Verify that the outline(s) fills) the appropriate model, in accordance with ES-401.
on subsequent
~ V
days.4.a.Assess whether plant-specific
~
priorities (including
W
PRAandIPE insights)are covered 76tI1tinthe appropriateexamsections.
./
G b.Assess whetherthe10CFR 55.41/43and55.45 sampling is appropriate.tWP E N c.Ensure that KiA importance
R
ratings (except for plant-specific
b.
priorities)areat least 2.5.76.<lJE d.Check for duplicationandoverlap
Assess whether the outline was systematically and randomly prepared in accordance with
among exam sections.76.<tJR A e.Checktheentire examforbalanceof
-IS .#J.... '01{S
coverage.76 4r/\'\Xb L Assess whethertheexamfitsthe
I
appropriatejoblevel(ROorSRO).
Section 0.1 of ES-401 and whether all KiA cateqories are appropriately sampled.
o>>
T
'f\\t5 f.7"1omitS-:s::: Printed Na...'JO ioltcPJih a.Author O"V'".:>b.Facility
Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.
Reviewer (*)TJJ&I"""0 cJ A If.." e,/--Y"'r.trJ/jV//?(07c.NRC Chief Examiner (#)
--1) .,~ *
A-'B4-r&#xa3;5 IL/J O<.:t.':is"'/fltlo7 d.NRC Supervisor
T
J IIUI'N 1.(1:\\IfT)dl
c.
HIi-!/tfb'1{I/N!lJ 1 (-, r....Note:#Independent
E
NRC reviewer initial items in Coiwr;n"c";chief examiner concurrence
d.
required.*
Assess whether the justifications for deselected or rejected KiA statements are appropriate.
CU'*-i1cted d'Y1 L1'Mf\'\eJ."\1-
~ I-ra)
'S
N
ES-201,Page25of27
NJ6
ES-201 Examination
2.
Security AgreementFormES-201-31.Pre-Examination
a.
J/:<e log ike!I acknowledgethatIhaveacquiredspecialized
Using Form ES-301-5, verify that the proposed scenario sets cover the required number
knowledgeabouttheNRClicensing
~ 1Y
examinationsscheduledfortheweek(s)of
of normal evolutions, instrument and component failures, technical specifications,
,7/?I/o (fasofthedateofmy signature.IagreethatIwillnot
M$
knowinglydivulgeanyinformationaboutthese
S
examinationstoanypersonswhohavenotbeenauthorizedbytheNRC chief examiner.IunderstandthatIamnottoinstruct,evaluate,orprovide
and major transients.
performancefeedbacktothose
I
applicantsscheduledtobe
M
administered
b.
these licensing examinationsfromthisdateuntil
Assess whether there are enough scenario sets (and spares) to test the projected number
completion
U
of examination
and mix of applicants in accordance with the expected crew composition and rotation schedule ~ ~ r1&#xa3;
administration,exceptas specificallynotedbelowandauthorizedbytheNRC(e.g.,actingasa
L
simulator booth operator or communicator
without compromising exam integrity, and ensure that each applicant can be tested using
is acceptableiftheindividualdoesnotselectthetrainingcontentorprovidedirector
A
indirectfeedback).Furthermore,Iamawareofthephysicalsecurity
at least one new or significantly modified scenario, that no scenarios are duplicated
measuresandrequirements(as
T
documentedinthefacility
from the applicants' audit testis). and that scenarios will notbe repeated on subsequent days.
licensee's
0
procedures)andunderstandthat
c.
violationofthe conditionsofthis agreementmayresultincancellationofthe
To the extent possible, assess whether the outline(s) conform(s) with the qualitative
examinationsand/oran enforcement
p
action againstmeorthefacilitylicensee.Iwill
R
immediatelyreporttofacility
and quantitative criteria specified on Form ES-301-4 and described in AppendiX2Ctt -tlcn
managementortheNRCchief
Irv ~
examineranyindicationsor
-
suggestions
30
that examinationsecuritymayhavebeen
'
compromised.2.Post-ExaminationTothebestofmyidnotdivulgetoany
u.h
unauthorizedpersonsany
.~ w.A
informationconcerningtheNRClicensing
,'U
examinations
wl-\\'
administeredduringtheweek(s)of
. L ioCe\\15E'e
!h9-O:9FromthedatethatIenteredintothissecurity
YIlt!> ~
agreementuntilthecompletionof
~ *td
examinationadministration,Ididnotinstruct,evaluate,orprovide
t:S-
performance
i-l.IWa.S""Y\\Df- s
feedbacktothose applicantswhowere administeredtheselicensing
~\\'
examinations,exceptasspecificallynotedbelowandauthorizedbytheNRC.
Lv. u..
.JOBTITLE/RESPONSIBILITY
{)IIVII~
:szl14EES-201,Page26of27
W(V.[\\SI".fL "i-iAS
ES-201 Examination
~,'''IA
Security AgreementFormES-201-3
~'1'v)k-\\t: .
1.Pre-Examination//I I
3.
o?f I acknowledgethatIhaveacquiredspecialized
a.
knowledgeabouttheNRClicensing
Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:
examinationsscheduledfortheweek(s)of
(1 )
;2./'lJ (0'ifasofthedateofmysignature.IagreethatIwillnot
the outline(s) contain(s) the required number of control room and in-plant tasks
knowingly divulge any informationaboutthese
W
examinationstoanypersonswhohavenotbeenauthorizedbytheNRCchiefexaminer.
distributed among the safety functions as specified on the form
I understand
r<<V
that Iamnottoinstruct,evaluate,orprovide
/
performance
(2)
feedbacktothoseapplicantsscheduledtobe
task repetition from the last two NRC examinations is within the limits specified on the form
administered
76 rr
these licensing examinationsfromthisdateuntil
T
completionofexamination
(3)
administration,exceptas specificallynotedbelowandauthorizedbytheNRC(e.g.,actingasa
no tasks are duplicated from the applicants' audit testis)
simulator booth operator or communicatorisacceptableifthe
(4)
individualdoesnotselectthetrainingcontentorprovidedirectorindirectfeedback).Furthermore, Iamawareofthephysicalsecuritymeasuresand
the number of new or modified tasks meets or exceeds the minimums specified on the form
requirements (as documentedinthefacility
'*
licensee'sprocedures)and
(5)
understandthatviolationofthe
the number of altemate path, low-power, emergency, and RCA tasks meet the criteria
conditionsofthisagreementmayresultin
on the form.
cancellationofthe examinationsand/oran enforcement
b.
action againstmeorthefacilitylicensee.Iwill
Verify that the administrative outline meets the criteria specified on Form ES-301-1:
immediatelyreporttofacility
(1 )
managementortheNRCchief
the tasks are distributed among the topics as specified on the form
examineranyindicationsor
7!J ~
suggestions
(ff6
that examinationsecuritymayhavebeen
(2)
compromised.
at least one task is new or significantly modified
2.Post-ExaminationTothebestofmyIdidnotdivulgetoany
(3)
unauthorizedpersonsanyinformationconcerningtheNRClicensing
no more than one task is repeated from the last two NRC licensinq examinations
examinations
c.
administeredduringtheweek(s)of-Y'f'OG'FromthedatethatIenteredintothissecurity
Determine if there are enough different outlines to test the projected number and mix
agreementuntilthecompletionof
15,iJ ~
examination
of applicants and ensure that no items are duplicated on subsequent days.
administration, Ididnotinstruct,evaluate,orprovide
4.
performance
a.
feedbacktothose applicantswhowereadministeredtheselicensingexaminations,exceptas
Assess whether plant-specific priorities (including PRA and IPE insights) are covered
specificallynotedbelowandauthorizedbytheNRC.JOBTITLE/RESPONSIBILITY
76 ~ tI1t
kD Ifo go/20ES-201,Page26of27
in the appropriate exam sections.
DATE
G
SC-&>>fY#/l:-&#xa3;JO f"
b.
Examination
Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate.
.~ ~ tWP
E
N
c.
Ensure that KiA importance ratings (except for plant-specific priorities) are at least 2.5.
76 .<lJ ~
E
d.
Check for duplication and overlap among exam sections.
76 .<tJ ~
R
A
e.
Check the entire exam for balance of coverage.
76 4r/ \\'\\Xb
L
Assess whether the exam fits the appropriate job level (RO or SRO).
o>> ~v..I 'f\\\\t5
f.
7"1omitS -:s:::
Printed Na
...' JO
ioltcPJih
a. Author
O"V'" .:>
~
~~
b. Facility Reviewer (*)
TJJ& I""" "'~
0
cJA If.."
e,
/-- Y
"' r. trJ/
jV//? (07
c. NRC Chief Examiner (#)
M.AI\\~ A- 'B4-r&#xa3;5 I ~ ~ L/ J O<.:t.':is
"'/fltlo7
d. NRC Supervisor
J IIUI'N 1.(1:\\\\IfT)dlHIi-! / tfb'
1
{I/N!lJ1
(
-,
r
....
Note:
# Independent NRC reviewer initial items in Coiwr;n "c"; chief examiner concurrence required.
* ()(C~'h\\trl.s
CU'- i1cted
d'Y1
L1'Mf\\'\\eJ."\\1- 'S"'~-\\-.
ES-201, Page 25 of 27
 
ES-201
Examination Security Agreement
Form ES-201-3
1.
Pre-Examination
J/:< elog ike!
I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of ,7/?I/o(f
as of the
date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized
by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be
administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and
authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or
provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility
licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an
enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or
suggestions that examination security may have been compromised.
2.
Post-Examination
To the best of my kno~ledg2~1
id not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered
during the week(s) of !h9 -
i'~ O:9From the date that I entered into this security agreement until the completion of examination administration, I did not
instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically
noted below and authorized by the NRC.
.
JOB TITLE / RESPONSIBILITY
:szl14E
DP~Tlo~
ES-201, Page 26 of 27
 
ES-201
Examination Security Agreement
Form ES-201-3
1.
Pre-Examination
/
/
I
I
'2.~{ o?f t"~v
I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of ;2./ 'lJ(0'if as of the
date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized
by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be
administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and
authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or
provide direct or indirect feedback).
Furthermore, I am aware of the physical security measures and requirements (as documented in the facility
licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an
enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or
suggestions that examination security may have been compromised.
2.
Post-Examination
To the best of my knowled~e I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered
during the week(s) of ~~ - Y'f'OG' From the date that I entered into this security agreement until the completion of examination administration, I did not
instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically
noted below and authorized by the NRC.
JOB TITLE / RESPONSIBILITY
kD
Ifo
~ogo
/20
ES-201, Page 26 of 27
DATE
 
SC-&>>fY#/
l:-&#xa3;JOf"
ES~201
Examination See!~tl-A-8-ree-m-l!-n-t-F-crm-------------f-o-nn""(~s-2ft1*3
Pre-Exarnin:atfon
Pre-Exarnin:atfon
)!;z.r;/t;? I ackrlo.edge
)!;z.r;/t;?
that E have acquirHd specialized
~wV
knowledge about the-tIRe Ijc;ensing
I ackrlo.edge that Ehave acquirHdspecialized knowledgeabout the-tIRe Ijc;ensing examillations t.cheduled for the week(s) of ?j~10 "l
exam illations t.cheduledforthe week(s)of?j10"l as of the date o.f my signaturtr.
as of the
I agree that I will no'!knowin{ly divulge any infurmation
date o.fmy signaturtr. I agree that I will no'! knowin{ly divulge any infurmation about these examinaoons to aly per-mns who haw not been authnrized
about these examinaoons
by the NRC chief examinet'". I urtde:rsland t'lat I ern &#xa3;101to instruc;l. evaluate, or provide performeoce feedback 10thoseapj;li[;Clnls scheduled to be
to aly per-mns who haw not been authnrized
admil'iisteled these licensing examinatlO1l$. from this dat.eunlil c:omplel:ion of examination administniliorl, except as specificalit noted oolow and
by the NRC chief examinet'".
aultlorized byttle NRC (e.g., acting as a simt.Jator boot!
I u rtde:rsland
h 'Opef~or or eemmurlicatOl' is aooeptableif 111 iii indi\\lidLSlI does not select the fJainingCOnient or
t'lat I ern&#xa3;101 to instruc;l.
llfovide direct a'" indirec1 feedback). Furthemllre. I aIrI aware of !tie physical security measures aJ1d rE!q\\lirernel11s (as documented fl the facjlil~
evaluate, or provideperformeoce
lit:erJsee's procecb'es) and understand thai vio!a1ionof the conditions of thks agreem enJ. mayrestflt in carnl!Dalion (If the elo:aminatioos and/or an
feedback 10 those apj;li[;Clnls
enfDlcement action agains1 me or lhefaGilitv licensee. Iw. immEdialelyreport to facility managemeritOf tire NRC chief examio@r 8rIY indications Dr
scheduled to be admi l'iisteled
suggesfons that eKaminal~on o.ewrity may ha\\19 been compromised.
these licensing examinatlO1l$.
1.
from this dat.eunlil c:omplel:ion
2_
of examination
Post-E nmination
admi nistniliorl, except as specifica lit noted oolow and aultlorized
To tf1ebest of my lfficMtIedge. td id not divLIIgeto any un<llJthorlzed persons any irforrnatiQn ooncemiog the NRC Ii-cerlsing exarnillaticns admTiistered
byttle NRC (e.g., acting as a simt.Jator
dlJri1g the week(s) of
boot!h
. From the dale that I entered into this sewlil1' agreemeflt unlil ttle compleliort of e:xami1ation admi1istratioo. rtid oot
or eemm urlicatOl'
instrudl. evaluale, or provide pelfurmance feedback m thase applicants who were administered these licensi"lg elC3minations, ext:ept as spef;ifically
is aooeptableif
noted beJow:and authorized by the NRC
111 iii indi\lidLSlI
.
does not select the fJainingCOnient
ES-201, Page 26 of27
or llfovide direct a'" indirec1 feedback).
--------------
Furthemllre.
--------------
I aIrI aware of!tie physical security measures aJ1d rE!q\lirernel11s (as documented
JOB rrns I RESPONSIBILITY
fl the
fS. \\J !ef'JPR
lit:erJsee's
PRlmED!'WAE~
procecb'es)
SIGNAT~
and understand
DJ}T~. ~."
thai vio!a1ion of the conditio ns of thks agreem enJ.mayrestflt
T
in carnl!Dalion (If the elo:aminatioos
{
and/or an enfDlcement
VA E
action agains1 me or lhefaGilitv
TE
licensee.Iw.immEdialelyreport
1:~s8'H M.$G..*Jb(
to facility managemeritOf
.f-~-Fli../L-:o,..t
tire NRC chief examio@r 8rIY indications
=,-,_"L-J-=;;:..__~
Dr suggesfons
__
that
Yf_
o.ewrity may ha\19 been compromised.
*_~iLE:.!LQ.7~~Z* Jl oK
1.2_Post-E nmination To tf1e best of my lfficMtIedge.
2.
t d id not divLIIge to any un<llJthorlzed
---l.[~>--*-----
persons any irforrnatiQn
~_"
ooncemiog the NRC Ii-cerlsing
_
exarnillaticns
3.
admTiistered
.
dlJri1g the week(s)of.From the dale that I entered into this sewlil1'agreemeflt
--'-
unlil ttle compleliort
_
of e:xami1ation
4.
admi1istratioo.
.
r tid oot instrudl.evalu ale, or provide pelfurmance
_
feedback mthaseappl icants who were ad ministered
5.
these licensi"lg
.
elC3minations, ext:ept as spef;ifically
_
noted beJow:and authorized
6.
by the NRC.ES-201, Page 26 of 27--------------
_
--------------JOB rrns I RESPONSIBILITY
7.
fS.*\J!ef'J PR T{VA E TE
_
M.$G..*Jb(
a.
=,-,_"L-J-=;;:..
9.
____Yf_Z*Jl oK 2._3..--'-_4.._5.._6._7._a.9.
--:.~
_10.,_11.,._12.,__13,,_14.15_,-='-----------------
_
NOTES: C 0-
10.,
ES-301 AdministrativeTopicsOutlineFormES-301-1
_
((Facility: Sequoyah1&2 Ro9Dateof Examination:
11.,
1/2008 Examination
.
Level (circle one): Operating Test Number: NRC Administrative
_
Topic Type Code*Describe activitytobe performed (see Note)Conduct of Operations
12.,
2.1.1 Knowledge of conduct of operations
~__
requirements.(CFR: N,R 41.10/45.13)
13,,
3.7/3.8 Determinelicensestatus
_
Active/Inactive Conduct of Operations
14.
2.1.33 Ability to recognize indications
15_,-='
for system operating parameterswhichare entry-level
-----------------
conditions
NOTES:
for technical D,S specifications.(CFR:43.2/43.3/45.3)3.4/4.0 PerformShiftLogSI-2SGLevel
C
Instrumentation (JPM 176)2.2.18 Knowledgeofthe process for managing maintenance
0-
Equipment Control activities
 
during shutdown operations.
ES-301
N,R (CFR: 43.5/45.13)
Administrative Topics Outline
3.6 Containment
Form ES-301-1
Closure Time Radiation Control 2.3.10 Ability to perform procedures
(
to reduce excessive levels of radiationandguard against personnel exposure.(CFR: D,R43.4/45.10)2.9/3.3 SurveyMap(JPM166)
(
Emergency Plan 2.4.41 Knowledgeofthe emergency action level thresholds
Facility:
and classifications.(CFR:
Sequoyah 1 & 2
43.5/45.11)
Ro9
4.1 D,S ClassifytheREP DegradedCorewith PossibleLossof Coolable Geometry and Likely Cntmt Failure(JPM109)NOTE: All items(5totalare
Date of Examination:
requiredforSROs.RO
1/2008
applicants
Examination Level (circle one):
requireonly4 items unlesstheyare retaking only the administrative
Operating Test Number:
topics,when5are required.*Type Codes&Criteria: (C)ontrol room Class(R)oom (D)irect from bank (:S:3forROs;:s: for SROs&RO retakes)(N)ew or (M)odified
NRC
from bank(>1)(P)revious
Administrative Topic
2 exams (:S: 1;randomly selected)(S)imulator NUREG-1021Revision9
Type Code*
ES-301AdministrativeTopicsOutlineSROAdminJPM
Describe activity to be performed
SummaryFormES-301-1
(see Note)
(A1aTheapplicantwillevaluatethestatusoflicensedoperatorsworkhistorytodetermineiflicenseisactiveor
Conduct of Operations
inactive.A1bThe applicantwillberequiredtorecognizearequiredTechnicalSpecificationentrywhilecompletingandaportionofthedailyshiftsurveillanceinstruction.A2Theapplicantwillevaluatearequesttoopenacontainmentpenetrationduringarefueloutageanddeterminetherequirements.A3Theapplicantwilluseasurveymaptodetermineanti-contaminationclothingrequirements,staytime,andradiationlevelsinarea.A4TheapplicantwillevaluateconditionsforentryintotheE-Plan,determinetheproperclassification,protectionactionrecommendation,andmakerequirednotifications.
2.1.1
NUREG-1021Revision9
Knowledge of conduct of operations requirements. (CFR:
ES-301 Control Room/In-PlantSystemsOutlineFormES-301-2
N,R
(Facility: Sequoyah1&2Dateof Examination:
41.10/45.13)
1/2008-ExamLevel(circleone):SRO(U)OperatingTestNo.:
3.7/3.8
NRCControlRoomSystems@(8forRO;7forSRO-I;2or3forSRO-U,including1ESF)
Determine license status
System IJPMTitle Type Code*Safety Function a.W/E14 High Containment
Active / Inactive
Pressure(EA-1.1)3.7I3.7 D,A,S 5 RespondtoHigh ContainmentPressure(JPM057AP1)b.003 Reactor CoolantPumpSystem(A2.01)3.5I3.9 N,L,S 4P Respondtoa#1RCPSealFailure
Conduct of Operations
c.001ControlRodDriveSystem (A3.05)3.5I3.5 M,A,L,S 1 Shutdown Bank Withdrawald.004 Chemical and VolumeControlSystem(A4.06)
2.1.33
3.6 13.1 N,L,S 2FillandVent
Ability to recognize indications for system operating
Excess Letdowne.038Steam
parameters which are entry-level conditions for technical
GeneratorTubeRupture(EA1.32)4.6
D,S
14.7 D,A,S 3SGtuberupturewithMSIVfailstoClose(JPM
specifications. (CFR: 43.2 /43.3/45.3)
075AP)f.015 Nuclear InstrumentationSystem(A1.01)3.5I3.8 D,A,S 7 Calibrate Power Range Nuclear Instrumentation (JPM 22-AP2)g.064 Emergency Diesel Generator(ED/G)System(A4.06)3.9I3.9 M,D,S 6 ShutdowntheDiesel Generator(1A-Aand1B-B)(JPM046-1)
3.4 / 4.0
h.In-PlantSystems@(3forRO;3forSRO-I;3or2for
Perform Shift Log SI-2 SG Level Instrumentation (JPM
SRO-U)i.061 Auxiliary I Emergency Feedwater System (A2.04)3.4I3.8 D,A,E,R 4S OperatetheTOAFWPumpLocally(JPM
176)
74-2AP)j.004 Chemical and VolumeControlSystem (A2.25)3.8 14.3 D,R 1 UncontrolledDilutionFlowPath
2.2.18
Isolation (O-SI-OPS 063-214.0))(JPM40-2)k.062AC Electrical
Knowledge of the process for managing maintenance
Distribution (A2.10)3.0 13.3 D,A 6 Transfer480vSOBoard
Equipment Control
2A1-AfromNormalto
activities during shutdown operations.
Alternate (JPM 061AP2)@AllROandSRO-Icontrolroom(andin-plant)
N,R
systemsmustbe differentandserve different safety functions;all5SRO-U systemsmustserve different safety functions;
(CFR: 43.5/45.13)
in-plant systems and functions may overlap thosetestedinthecontrolroom.
3.6
NUREG-1021Revision9
Containment Closure Time
ES-301 Control Room/In-PlantSystemsOutlineFormES-301-2
Radiation Control
\,*TypeCodesCriteriaforRO/
2.3.10
SRQl-1 j SRO-U"--(A)lternatepath
Ability to perform procedures to reduce excessive levels of
radiation and guard against personnel exposure. (CFR:
D,R
43.4 / 45.10)
2.9/3.3
Survey Map (JPM 166)
Emergency Plan
2.4.41
Knowledge of the emergency action level thresholds and
classifications.(CFR: 43.5/45.11)
4.1
D,S
Classify the REP Degraded Core with Possible Loss of
Coolable Geometry and Likely Cntmt Failure (JPM 109)
NOTE:
All items (5 total are required for SROs.
RO applicants require only 4 items unless they are retaking
only the administrative topics, when 5 are required.
*Type Codes & Criteria:
(C)ontrol room
Class(R)oom
(D)irect from bank (:S: 3 for ROs; :s: for SROs & RO retakes)
(N)ew or (M)odified from bank (> 1)
(P)revious 2 exams (:S: 1; randomly selected)
(S)imulator
NUREG-1021
Revision 9
 
ES-301
Administrative Topics Outline
SRO Admin JPM Summary
Form ES-301-1
(
A1a
The applicant will evaluate the status of licensed operators work history to determine if license is active or
inactive.
A1b
The applicant will be required to recognize a required Technical Specification entry while completing and a
portion of the daily shift surveillance instruction.
A2
The applicant will evaluate a request to open a containment penetration during a refuel outage and determine
the requirements.
A3
The applicant will use a survey map to determine anti-contamination clothing requirements, stay time, and
radiation levels in area.
A4
The applicant will evaluate conditions for entry into the E-Plan, determine the proper classification, protection
action recommendation, and make required notifications.
NUREG-1021
Revision 9
 
ES-301
Control Room/In-Plant Systems Outline
Form ES-301-2
(
Facility:
Sequoyah 1 & 2
Date of Examination:
1/2008
-
Exam Level (circle one):
R~SRO~I SRO (U)
Operating Test No.:
NRC
Control Room Systems@ (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U, including 1 ESF)
System I JPM Title
Type Code*
Safety
Function
a.
W/E14 High Containment Pressure
(EA-1.1 )
3.7 I 3.7
D,A,S
5
Respond to High Containment Pressure (JPM 057AP1)
b.
003 Reactor Coolant Pump System
(A2.01 )
3.5 I 3.9
N,L,S
4P
Respond to a #1 RCP Seal Failure
c.
001 Control Rod Drive System
(A3.05)
3.5 I 3.5
M,A,L,S
1
Shutdown Bank Withdrawal
d.
004 Chemical and Volume Control System (A4.06)
3.6 13.1
N,L,S
2
Fill and Vent Excess Letdown
e.
038 Steam Generator Tube Rupture (EA1.32 )
4.6 14.7
D,A,S
3
SG tube rupture with MSIV fails to Close (JPM 075AP)
f.
015 Nuclear Instrumentation System (A1.01) 3.5 I 3.8
D,A,S
7
Calibrate Power Range Nuclear Instrumentation (JPM 22-AP2)
g.
064 Emergency Diesel Generator (ED/G) System (A4.06)
3.9 I 3.9
M,D,S
6
Shutdown the Diesel Generator (1A-A and 1B-B) (JPM 046-1)
h.
In-Plant Systems@ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)
i.
061 Auxiliary I Emergency Feedwater System
(A2.04)
3.4 I 3.8
D,A,E,R
4S
Operate the TO AFW Pump Locally (JPM 74-2AP)
j.
004 Chemical and Volume Control System
(A2.25)
3.8 14.3
D,R
1
Uncontrolled Dilution Flow Path Isolation (O-SI-OPS 063-214.0)) (JPM 40-2)
k.
062 AC Electrical Distribution
(A2.10)
3.0 13.3
D,A
6
Transfer 480v SO Board 2A1-A from Normal to Alternate (JPM 061AP2)
@
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions;
all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap
those tested in the control room.
NUREG-1021
Revision 9
 
ES-301
Control Room/In-Plant Systems Outline
Form ES-301-2
\\,
~
* Type Codes
Criteria for RO / SRQl-1 j SRO-U
" --
(A)lternate path
4-6/4-0'/2-3
4-6/4-0'/2-3
iJJ(C)ontrolroom
iJJ
ff!:<;47(D)irectfrombank
(C)ontrol room
'5,9/(E)mergencyorabnormalin-plant1/1"1:?:1\(L)ow-Power/Shutdown<::1/11:'?:1.:>(N)ewor(M)odifiedfrombankincluding1(A)
ff!:<;47
2/'?2"1'2:1-1 (P)revious2exams3/3/2(randomlyselected)
(D)irect from bank
0 (R)CA1/1/<:: 1.......-(S)imulator
'5,9 /
JPM Summary JPMAJPMBJPMCJPMDJPME ('-JPMFJPMGJPMIRHRspraywillbeestablishedinaccordancewithFR-Z.1,HighContainmentPressure.ThisisaBank
(E)mergency or abnormal in-plant
AlternatePathJPM.AnRCPsealfailurewillbediagnosedandtheAbnormalOperatingInstructionusedtoremovethepumpfromservice.Thisisanewlowpower/shutdownJPMAfailureofthestepcounterwilloccurduringthewithdrawalofShutdownRodsrequiringareactortrip.Thisisanewalternatepathlowpower/shutdownJPM.Excessletdownsystemwillbefilledandventedfromthecontrolroomusingthesystemoperating
1 /
instruction.Thisisanewlowpower/shutdownJPM.AMainSteamIsolationvalvewillfailtocloseduringtheisolationofsteamsideofarupturedsteam
1"1:?: 1 \\
generatorwillbeisolated
(L)ow-Power / Shutdown
..ThisisaBankAlternatePathJPM.PowerRangenuclearinstrumentswillbeadjustedinaccordancewiththesurveillanceinstruction092-078.0.ThisisaBankAlternatePathJPM.Unit1Diesel
<:: 1 /
GeneratorswillbeshutdownperEA-82-1.ThisisaBankmodifiedJPM.PlantJPM-ThetripandthrottlevalvewillnotopenelectricallywhileTDAFWpumpisbeingplacedinservicelocally.ThisisanAlternatepathBankJPMusingemergencyabnormalprocedureperformedinsidetheRCA.JPMJDilutionflowpathwillbeisolatedusingO-SI-OPS062-214.0.ThisisaBankJPMperformedinsidetheRCAusinganAppendixcontainsinasurveillanceinstruction.JPMKPlantJPM-A
11:'?:1 .:>
breakerwillfailtooperatewhileatransferofa480vShutdownBoardisbeingattempted.ThisisaBankAlternatePathJPM.
(N)ew or (M)odified from bank including 1(A)
NUREG-1021Revision9
2/'?2"1'2:1-1
ES-301 Control Room/In-PlantSystemsOutline
(P)revious 2 exams
Form ES-301-2 (Facility: Sequoyah1&2Dateof Examination:
3/
1/2008-ExamLevel (circle one): RO I SRO(I)(:;RO (uij Operating Test No.: NRC ControlRoomSystems@(8forRO;7for
3/
SRO-I;2or3for SRO-U, including1ESF)System IJPMTitle Type Code*Safety Function a.W/E14 High Containment
2 (randomly selected) 0
Pressure(EA-1.1)3.7I3.7 D,A,S 5 RespondtoHigh Containment
(R)CA
Pressure(JPM057AP1)b.003 Reactor Coolant Pump System (A2.01)3.5I3.9 N,L,S 4P Respondtoa#1RCPSeal
1 /
Failurec.001 Control Rod Drive System (A3.05)3.5I3.5 M,A,L,S 1 Shutdown Bank Withdrawal
1/<:: 1 .......-
d.e.f.g.h.In-PlantSystems@(3forRO;3for
(S)imulator
SRO-I;3or2for SRO-U)i.061 Auxiliary I Emergency Feedwater System (A2.04)3.4I3.8 D,A,E,R 4S OperatetheTD AFW Pump Locally (JPM 74-2AP)j.004CI ,eli lieal alld'v'olUi lie Conti 01 Systel Ii (AZ.25)3.8/4-:&-D,R'---1--
JPM Summary
Dilution Flow Patlltl143"I C-Y-tc.<,;"",<'d
JPMA
'?e-t-'.k..A,,-(.j..*W,J.
JPM B
1:::>, s<:..."""",t.../L,="'-k.D(PJ./tc EIe..G\-t-\c::..",J, 1:);sk\"Du-Hc"" (A J, 10):,.0/3,.3 D 1 ri 0-Y;:-e",v5k'SD.....J.''2.;11-1-14(Vct1'f"'oC...(,I/l.p2.)@AllROand SRO-I controlroom(and in-plant)systems must be differentandserve different safety functions;all5 SRO-U systems must serve different safety functions;
JPM C
in-plant systems and functions may overlap those testedinthe control room.NUREG-1021Revision9
JPM D
ES-301 Control Room/In-PlantSystemsOutlineFormES-301-2
JPM E
(((*TypeCodesCriteriaforRO/SRO-I/SRO-U (A)lternate
(
path4-6/4-6/2-3
'-
:>(C)ontrol room (D)irectfrombank
JPM F
4], (E)mergencyorabnormalin-plant1/1/:2::1\(L)ow-Power/Shutdown1/1/21 7-(N)ewor(M)odifiedfrombankincluding1(A)2/2/1'</(P)revious2exams3/3/2(randomlyselected)(R)CA?;1/1/21!fJ (S)imulator JPM SummaryJPMARHRspraywillbeestablishedin
JPM G
accordancewithFR-Z.1,HighContainmentPressure.ThisisaBank
JPM I
AlternatePathJPM.JPMBAnRCPsealfailurewillbediagnosedandtheAbnormalOperatingInstructionusedtoremovethepumpfromservice.Thisisanewlowpower/shutdownJPMJPMCAfailureofthestepcounterwilloccurduringthewithdrawalofShutdownRodsrequiringareactortrip.Thisisanewalternatepathlowpower/shutdownJPM.JPMIPlantJPM-ThetripandthrottlevalvewillnotopenelectricallywhileTDAFWpumpisbeingplacedinservicelocally.ThisisanAlternatepathBankJPMusingemergencyabnormalprocedureperformedinsidetheRCA.JPMJDilutionflowpathwillbeisolatedusingO-SI-OPS062-214.0.ThisisaBankJPMperformedinsidetheRCAusinganAppendixcontainsinasurveillanceinstruction.
RHR spray will be established in accordance with FR-Z.1, High Containment Pressure. This is a Bank
NUREG-1021Revision9
Alternate Path JPM.
ES-301OperatingTestQualityChecklist
An RCP seal failure will be diagnosed and the Abnormal Operating Instruction used to remove the pump
Form ES-301-3 (((Facility:Sequoyah1
from service. This is a new low power/shutdown JPM
&2DateofExamination:1/28/2008OperatingTestNumber:
A failure of the step counter will occur during the withdrawal of Shutdown Rods requiring a reactor trip.
NRC 1.GENERAL CRITERIA Initialsab*c#a.Theoperatingtestconformswiththepreviouslyapprovedoutline;changesareconsistentwithsampling
This is a new alternate path low power/shutdown JPM.
requirements(e.g.10CFR55.45,operationalimportance,safetyfunction
Excess letdown system will be filled and vented from the control room using the system operating
'/6-;LJdistribution
instruction. This is a new low power/shutdown JPM.
).b.Thereisno
A Main Steam Isolation valve will fail to close during the isolation of steam side of a ruptured steam
day-to-dayrepetitionbetweenthisandotheroperatingteststobeadministered-rs lyK!?duringthisexamination.-rZJ c.Theoperatingtestshallnotduplicateitemsfromtheapplicants'audittest(s)(seeSection\ri:7 D.1.a).,7ZJd.Overlapwiththewrittenexaminationandbetweendifferentpartsoftheoperatingtestis
generator will be isolated.. This is a Bank Alternate Path JPM.
/0withinacceptablelimits.
Power Range nuclear instruments will be adjusted in accordance with the surveillance instruction O-SI-OPS-
rzJe.Itappearsthattheoperatingtestwilldifferentiatebetweencompetentandless-than- competentapplicantsatthedesignatedlicenselevel.
092-078.0. This is a Bank Alternate Path JPM.
JZ---'2.WALK-THROUGH
Unit 1 Diesel Generators will be shutdown per EA-82-1. This is a Bank modified JPM.
CRITERIA---a.EachJPMincludesthefollowing,asapplicable:*initial conditions
Plant JPM -The trip and throttle valve will not open electrically while TDAFW pump is being placed in
.,..*initiatingcues
service locally. This is an Alternate path Bank JPM using emergency abnormal procedure performed inside
./*referencesandtools,includingassociatedprocedures
the RCA.
v*reasonableandvalidatedtimelimits(averagetimeallowedforcompletion)andspecific
JPM J
designationifdeemedtobetime-criticalbythefacilitylicensee
Dilution flow path will be isolated using O-SI-OPS 062-214.0.
/" 17--*operationallyimportantspecificperformancecriteriathatinclude:
This is a Bank JPM performed inside the
76-detailedexpectedactionswithexactcriteriaandnomenclature
RCA using an Appendix contains in a surveillance instruction.
v-systemresponseandotherexaminercues
JPM K
.,'-statementsdescribingimportantobservationstobemadebytheapplicant
Plant JPM - A breaker will fail to operate while a transfer of a 480v Shutdown Board is being attempted.
,"-criteriaforsuccessfulcompletionofthetask
This is a Bank Alternate Path JPM.
",,"-identificationofcriticalstepsandtheirassociatedperformancestandards
NUREG-1021
./-restrictionsonthesequenceofsteps,ifapplicable
Revision 9
." b.Ensurethatanychangesfromthepreviouslyapprovedsystemsandadministrativewalk-throughoutlines(FormsES-301-1and2)havenotcausedthetesttodeviatefromanyoff7Jthe acceptancecriteria(e.g.,itemdistribution,bankuse,repetitionfromthelast2NRC
 
examinations)specifiedonthoseformsandFormES-201-2.
ES-301
3.SIMULATOR CRITERIA---Theassociated
Control Room/In-Plant Systems Outline
simulatoroperatingtests(scenariosets)havebeenreviewedinaccordancewith-n:FormES-301-4andacopyisattached.PrintedName/
Form ES-301-2
Date.---r/'
(
/-:/1--//;7108 a.Author 7 hOl11ffSb.Facility
Facility:
Reviewer (*)
Sequoyah 1 & 2
-:>>: Iff 7/0 4.I...."'"'-'-'.1-_c.NRC Chief Examiner (#)'t-f\MUl A"'v':)AI K7.. fti.1l1'::1f:--.-..
Date of Examination:
o i
1/2008
d.NRC Supervisor
-
J).AtG(jJJ...
Exam Level (circle one):
l.\V If)MJJ.JAJ
RO I SRO(I)(:;RO (uij
I 7!:.m lor....-.--t'i!lJ/!",\"\.NOTE:*ThefacilitysignatureisnotapplicableforNRC-developedtests.
Operating Test No.:
#IndependentNRCreviewerinitialitemsinColumn"c";chiefexaminerconcurrencerequired.
NRC
NUREG-1021Revision9
Control Room Systems@ (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U, including 1 ESF)
ES-301 SimulatorScenarioQualityChecklist
System I JPM Title
Form ES-301-4 ((Facility: Sequoyah1&2DateofExam:
Type Code*
1/28/2008 Scenario Numbers: 1,2,3,4 OperatingTestNo.:NRC
Safety
QUALITATIVE
Function
ATTRIBUTES
a.
Initials a b*c#1.Theinitial
W/E14 High Containment Pressure
conditionsarerealistic,inthatsome
(EA-1.1 )
equipment and/or instrumentationmaybeoutof
3.7 I 3.7
73 service,butit doesnotcuethe operatorsintoexpectedevents.
D,A,S
10 W$2.The scenarios consistmostlyofrelatedevents."J'1-'3.Eachevent description
5
consists of*thepointinthe
Respond to High Containment Pressure (JPM 057AP1)
scenariowhenitistobeinitiated
b.
*the malfunction(s)thatareenteredtoinitiatethe
003 Reactor Coolant Pump System
eventJV*the symptoms/cuesthatwillbevisibletothecrew
(A2.01)
*the expected operator actions(byshift position)*theevent termination
3.5 I 3.9
point (if applicable)
N,L,S
4.Nomorethanone
4P
non-mechanisticfailure(e.g.,pipebreak)is
Respond to a #1 RCP Seal Failure
incorporatedintothe scenario without'70acrediblepreceding
c.
incidentsuchasa seismic event.7Z/5.The eventsarevalidwithregardtophysicsand
001 Control Rod Drive System
thermodynamics.-IZ..-6.Sequencingandtimingofeventsis
(A3.05)
reasonable,andallowsthe
3.5 I 3.5
examinationteamtoobtain
M,A,L,S
complete'76evaluation
1
results commensuratewiththe scenario objectives.-rt>>7.Iftime compression
Shutdown Bank Withdrawal
techniquesareused,the
d.
scenario summaryclearlysoindicates.
e.
Operators/'-5 Jl;have sufficienttimetocarryout
f.
expected activities
g.
withoutunduetime constraints.
h.
8.The simulator modelingisnotaltered.ri-9.The scenarioshavebeen validated.
In-Plant Systems@ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)
Pursuantto10CFR55.46(d),anyopen
i.
simulator performance
061 Auxiliary I Emergency Feedwater System
deficiencies
(A2.04)
or deviationsfromthe referencedplanthavebeenevaluatedto
3.4 I 3.8
ensure that functional71Jfidelity is maintainedwhilerunningtheplanned
D,A,E,R
scenarios.
4S
10.Every operatorwillbe evaluatedusingatleastonenewor
Operate the TD AFW Pump Locally (JPM 74-2AP)
significantly
j.
modified scenario.All otherscenarioshavebeenalteredin
004 CI,eli lieal alld 'v'olUilie Conti 01 Systel Ii
accordancewithSection
(AZ.25)
0.5ofES-301.1V11.All individual
3.8/4-:&-
operator competenciescanbe evaluated,asverifiedusingForm
D,R
ES-301-6 (submit the-/:5formalongwiththe
'---1--
simulator scenarios).
Ulieo'iti~IIedDilution Flow Patll IS9Iatiol~I-OPS0,6~+4:&)7~('"d'~!\\11~40'"2>>-~
jJ../12.Each applicantwillbe significantlyinvolvedintheminimum
~'f.
number of transients
tl143 "I ~3/z~~n,
and eventsspecifiedonForm ES-301-5 (submittheformwiththe
C-Y-tc.<,;"",<'d
simulator scenarios).
'?e-t-
TL/13.Thelevelof
p/~.;,,,r
difficulty
"-G'v-.t-_<:.~
is appropriate
<-..~
to support licensing decisionsforeachcrewposition.
~(A.
76'{'(lD Target Quantitative
'.
Attributes (Per Scenario;See Section D.5.d)Actual Attributes
k ..A,,-(.j..*W,J. 1:::>, s<:..."""",t ... / L,="'-
---1 2 3 41.Total malfunctions
k.
(5-8)8/1 6""'7/'16/-;L;Mf:, 2.Malfunctions
D(PJ. /tc EIe..G\\-t-\\c::..",J, 1:);sk\\"Du-Hc"" (A J, 10) :,.0/3,.3
afterEOPentry(1-2)
D 1 ri
2""'1...--7 2/;2/-rc;3.Abnormal events (2-4)3""-3" 4/3/"T/.J4.Major transients
0
(1-2)1/1 v1/1//,:)/L5.EOPs entered/requiring
-Y;:-e",v5k ~v 'SD ~e.....J. ''2.;11-1-14
substantive
~.iVv\\. (Vct1'f"'oC...(, ~ i41~ok(W(t
actions (1-2)1 ,/1/1/1/?5'17-"rib 6.EOP contingencies
O~ I /l.p2.)
requiring substantive
@
actions (0-2)1 v 0,/1/1/7'7 7tr-7.Criticaltasks(2-3)
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions;
2/3v 2/2/-rt-vWJ3 NUREG-1021Revision9
all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap
ES-301TransientandEventChecklistFormES-301-5
those tested in the control room.
(((Facility: Sequoyah1&2DateofExam:
NUREG-1021
1/28/2008 Operating TestNo.:NRCAE ScenariosPVPE 1 2 3 4 T MLN Spare 0 I I T T N CREW CREW CREW CREW C POSITIONPOSITIONPOSITIONPOSITION
Revision 9
A IAT L M N Y UTP M(*ESABSABSABS A B R I URT 0RT 0RT 0RT 0 0CP 0CP 0CP 0 C P RX 0",,-1 111 0 NOR 1/I 011 1 1 SROU I/C ,\5/Z 3 8442 MAJ 1/i 0 1221 TS 3/c 0 3 0 2 2 RX 1/0/111 0 NOR Ov 1/111 1 SROI-1 I/C 3/5/8 4 4 2 0 MAJ 1 v 1 v 2 2 2 1 TS 0 3/3 0 2 2 RX 0 1/0 1 1 1 0 NOR I 0" 1 111 1 SROI-2 I/C Y 4/7 11 4 4 2 MAJ f 1 v 2 3 2 2 1 TSOv 2 2 0 2 2 0 1 0 1 1 1 0 1 0 1 2 111 NA 7 5 3 15 4 4 2 111 3 2 2 1 2 0 0 2 022 1 1 0 111 4 4 2221 022NUREG1021Revision9
 
ES-301TransientandEvent
ES-301
ChecklistFormES-301-5
Control Room/In-Plant Systems Outline
(Facility: Sequoyah 1&2DateofExam:
Form ES-301-2
4/9/2007 Operating TestNo.:NRC A E ScenariosPVPE 1 2 3 4 T M L N Spare 0 I I T T CREW CREW CREW CREW N C POSITION POSITIONPOSITIONPOSITION
(
A I A T L MNY U T P M(*ESABSA B SABSAB R I U R T 0 R T 0 R T 0 R T 0 0 C P 0CP 0CP 0 C P11 0111 4 4 222 1 022 1 1 011144 2 2 2 1 02211 011144 222 1 0 2 2 Instructions:
(
1.Circle the applicantleveland enter the operating test numberandFormES-D-1
(
event numbers for each eventtype;TSarenot
* Type Codes
applicableforRO applicants.
Criteria for RO / SRO-I / SRO-U
ROs must serviceinboththe"at-the-controls (ATC)" and"balance-of-plant (BOP)" positions;
(A)lternate path
Instant SROs mustdoone scenario, including at least two instrument
4-6 / 4-6 / 2-3 :>
or component (I/C)malfunctionsandone major transient,intheATC position.2.Reactivity
(C)ontrol room
manipulations
(D)irect from bank
may be conducted undernormalor controlled
~9/:':;8/
abnormal conditions (refer to Section D.5.d)but must be significant
4],
per SectionC.2.aof Appendix D.(*)Reactivity
(E)mergency or abnormal in-plant
and normal evolutions
1 /
may be replaced with additional
1/:2::1\\
instrument
(L)ow-Power / Shutdown
or component malfunctionsona1-for-1basis.
1 /
3.Whenever practical, both instrument
1 / 21
and component malfunctions
7-
should be included;only those that require verifiable
(N)ew or (M)odified from bank including 1(A)
actions that provide insighttothe applicant's
2/
competence
2/
count toward the minimum requirements
1'</
specifiedforthe applicant's
(P)revious 2 exams
licenselevelinthe
3/
right-hand
3/
columns.This matrixassumesthatScenario
2 (randomly selected)
3isused asthespare.If scenario 3isusedincombinationwithany
(R)CA
otherscenario,the
?; 1 /
minimum requirementsarestillmetforeachapplicant.NUREG1021Revision9
1/21!fJ
ES-301 Competencies
(S)imulator
Checklist Form ES-301-6 ((Facility: Sequoyah1&2DateofExam:
JPM Summary
1/28/2008 OperatingTestNo.:NRC
JPM A
SRORO(ATC)BOP/CRO Competencies
RHR spray will be established in accordance with FR-Z.1, High Containment Pressure. This is a Bank
SCENARIO SCENARIO SCENARIO12 3 412 3 4123 4 I nterpret/Diag-2,3,6,3,4,5,3,4,5,2,5,6,1,2,3,2,5,6,3,4,5,noseEvents2-91-7,92-9
Alternate Path JPM.
2-996,7,9 6,8,9 7,8 4-8 4,7,8 7 9 and Conditions
JPM B
Comply With 1,2,3, 3,5,6, 1,3,4,1,2,5,1,4,5,1,2,3,1,2,6, 1,3,4,andUseALLALLALLALL
An RCP seal failure will be diagnosed and the Abnormal Operating Instruction used to remove the pump
6,8,9 9 5,6,8,6,7,86,85,77
from service. This is a new low power/shutdown JPM
5,6,7, Procedures
JPM C
(1)9 9 Operate 1,2,3, 3,5,6, 1,3,4,1,2,5,1,4,5,2,3,5,1,2,6, 1,3,4, Control Boards N/AN/AN/AN/A 6,8,9 9 5,6,8,6,7,86,8,777
A failure of the step counter will occur during the withdrawal of Shutdown Rods requiring a reactor trip.
5,6,7, (2)9 9 Communicate
This is a new alternate path low power/shutdown JPM.
1,2,3, 1,3,4, 1,3,4, andALLALLALLALL
JPM I
6,8,9 3,4,5, 5,6,8,1,2,5,1,4,5,1,2,3,1,2,5, 5,6,7, 6,7,96,7,86,8,74,7,86,7
Plant JPM -The trip and throttle valve will not open electrically while TDAFW pump is being placed in
Interact 9 9 Demonstrate
service locally. This is an Alternate path Bank JPM using emergency abnormal procedure performed inside
SupervisoryALLALLALLALLN/AN/A
the RCA.
N/AN/AN/AN/AN/AN/A
JPM J
Ability (3)Comply WithandUseTech.2-41,2,43,42,3 N/AN/AN/AN/AN/AN/AN/AN/A
Dilution flow path will be isolated using O-SI-OPS 062-214.0.
Specs.(3)Notes:(1)IncludesTechnicalSpecification
This is a Bank JPM performed inside the
complianceforanRO.(2)OptionalforanSRO-U.
RCA using an Appendix contains in a surveillance instruction.
(3)Only applicabletoSROs.Instructions:Circlethe applicants'licensetypeand
NUREG-1021
enteroneormoreevent
Revision 9
numbersthatwill allow the examinerstoevaluate
 
every applicable
ES-301
competencyforeveryapplicant.
Operating Test Quality Checklist
NUREG-1021Revision9
Form ES-301-3
ES-401 Written Examination
(
Quality Checklist Form ES-401*6
(
h u s:DateofExam:
(
1/;1.008 Exam Level'RO.:
Facility:
..Initial Item Description
Sequoyah 1 & 2
a b*c'--;15-1 Questions and answers are technically
Date of Examination:
accurate and applicabletothefacilitv.
1/28/2008
71r-J2.o.NRCKJAsare
Operating Test Number:
referencedforall questions.
NRC
-;s J}--/rrIf?b.Facility learning objectives
1. GENERAL CRITERIA
are referenced
Initials
as available.
a
3.SRO guestions are appropriate
b*
in accordancewithSectionD.2.dofES-401
c#
--J6-rz,J v'v'R>-....4 The sampling processwasrandomand
a.
systematic(Ifmorethan4ROor2SRO
The operating test conforms with the previously approved outline; changes are consistent
questions%1Pwere repeatedfromthelast2NRClicensmpexams, consulttheNRROLprogramoffice).
with sampling requirements (e.g. 10 CFR 55.45, operational importance, safety function
5.Question duplication
'/6 -;LJ t~~
from the license screening/auditexamwas controlled
distribution).
as indicated below (checktheitemthat
b.
applies)and appears appropriate:_theauditexamwas
There is no day-to-day repetition between this and other operating tests to be administered -rs
systematically
lyK!?
and randomly deveioped;
during this examination.
or_theauditexamwas
-rZJ
completedbeforethelicenseexamwasstarted;or
c.
76 JZJ__the examinations
The operating test shall not duplicate items from the applicants' audit test(s) (see Section
were developed independently;
/'~
or"Jf.-the licensee certifiesthatthereisno
\\ri:7
duplication;
D.1.a).
or__other (explain)----------_._-
,7ZJ
Ban:-r Mcditied 6.Bankusemeetslimits(nomorethan
d.
75 percent Newfromthebank,atleast10
Overlap with the written examination and between different parts of the operating test is
percentnew,andtherest25/'6"f1J fYIf;>newor modified);
/0
enter the actual RO/SRO-only ,J,7 I IS r----question distribution(s)atright.7.Between50and60 percent of the questionsontheRO 1 MClnory CIAexamarewnttenatthe
t~
comprehension/
within acceptable limits.
analysis level,-15theSR.O exammayexceed60
rzJ
percent If the randomly-n>selectedK/As
e.
supportthehiqhe:cognitive
It appears that the operating test will differentiate between competent and less-than-
levels, enter 3 c;/7 i70/latheactual RO I SRO question distributiorus)
~
at light J 8.References/handouts
~ifv
provideddonotgiveaway
competent applicants at the designated license level.
answers-;:5 7lr/IVSoraidinthe
JZ---'
elimination
2. WALK-THROUGH CRITERIA
of distractors.
-
9.QuestioncontentconformswithspecificK/A
-
statementsinthe previously
-
approved examination
a.
outlineandis appropriateforthetiertowhichtheyare
Each JPM includes the following, as applicable:
assigned;/6.-fl-//'if:>deviations
*
are justified.
initial conditions .,..
10.Question psychometric
*
qualityandformat meet the guidelinesinES Appendix B.--y1--1W1S 11Theexam contains the required number of one-point, multiplechoiceitems;-D 11Pthetotalis
initiating cues ./
correct and agreeswiththevalueonthe
*
cover sheet.____Printed Name/
references and tools, including associated procedures v
Date a.Author 210m m
*
/'/L/-v----:=:-//1/ot'b.Facility Reviewer (*J
reasonable and validated time limits (average time allowed for completion) and specific
/././/6'-/'.;,/Z fft;c.NRC Chief Examiner (#)It BtrT$/ff;["J (j, I'".J;:-:...d NRC Regional Supervisor
designation if deemed to be time-critical by the facility licensee /"
J..!J4<AUJ-
17--~
--r:.WttiJ)NV.t>J
*
/.(."----'""Note:*The facility reviewer's
operationally important specific performance criteria that include:
initials/signaturearenot applicable
76
for NRC-developed
- detailed expected actions with exact criteria and nomenclature v
examinations.
- system response and other examiner cues .,'
#Independent
- statements describing important observations to be made by the applicant ,"
NRC reviewerinitialitemsin
- criteria for successful completion of the task ",,"
Column"c";chief examiner concurrence
- identification of critical steps and their associated performance standards ./
required.ES-401,Page30of34
- restrictions on the sequence of steps, if applicable ."
ES-401,Rev.9
b.
WrittenExamReview
Ensure that any changes from the previously approved systems and administrative walk-
Worksheet Sequoyah 2008-301FormES-401-9
through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of
Q#KiA#BLL Psychometric
~
Flaws Content Flaws U CommentM00 Stem Cues T/F1Non>1Non Partial MinSRO E Explanation
f7J {~
N K D FocusCredCred KiA Only SDistDist BIW GENERAL COMMENTSB=Bank 1 M=Modified
the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC
1 N-New 1 F-FundamentalLevel(I.E.Memory)
examinations) specified on those forms and Form ES-201-2.
1 H-HigherCognitiveLevel(I.E.
3. SIMULATOR CRITERIA
CIA)IForAllBANKquestions:swaptheorderoftheanswerchoicessothatapplicantscannotrelyonrecallofthecorrectanswerlocation.
-
ROEXAM I 007EAl.08NH 2 BCanthefirsttwobulletsbereplacedwiththefollowingsinglebullet: "UnitIwasat10%powerwhenbothMFPTstripped." SFirstbulletrevised.Secondbulletnotchanged.Theteachinginthesecondbulletdoesnotaffectthe
-
a11SWerStothisquestionoranyotherquestions.OKMAB
-
02/04/2008Canthethirdbulletreadasfollows: "Stearngeneratorlevelsdroppedtoaminimum
The associated simulator operating tests (scenario sets) have been reviewed in accordance with
of##%andthenbeganto
~ -n: .~
rise."-(usealevelthatisacouple
Form ES-301-4 and a copy is attached.
ofpercentabovethe
Printed Name / Signa~Q.
AFWstartsignal)Incorporated.OKMAB
Date
.---r/'
~rvz'-5 /-:~~,
/1--
//;7108
a.
Author
7 hOl11ffS
b.
Facility Reviewer (*)
~,
i.)tlJLc.~
-:>>:
Iff 7/0 4
. I
...."'"'- '-'
.1-_ ./~~~..I~
c.
NRC Chief Examiner (#)
't-f\\ MUl A"'v':) AIK7 '/n~..~/l fti. 1l1'::1f:--.-..
o i /1"3!~trJB
d.
NRC Supervisor
J).AtG(jJJ...l.\\V If)MJJ.JAJ I 7!:.mlor
....-.--
t'i!lJ/!",
\\ " \\
.~
NOTE:
*
The facility signature is not applicable for NRC-developed tests.
#
Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.
NUREG-1021
Revision 9
 
ES-301
Simulator Scenario Quality Checklist
Form ES-301-4
(
(
Facility:
Sequoyah 1 & 2
Date of Exam:
1/28/2008
Scenario Numbers:
1,2,3,4
Operating Test No.:
NRC
QUALITATIVE ATTRIBUTES
Initials
a
b*
c#
1.
The initial conditions are realistic, in that some equipment and/or instrumentation may be out of
73
service, but it does not cue the operators into expected events.
10 W$
2.
The scenarios consist mostly of related events.
-J~ "J'1-' ~
3.
Each event description consists of
*
the point in the scenario when it is to be initiated
*
the malfunction(s) that are entered to initiate the event
1~
/~ JV
*
the symptoms/cues that will be visible to the crew
*
the expected operator actions (by shift position)
*
the event termination point (if applicable)
4.
No more than one non-mechanistic failure (e.g., pipe break) is incorporated into the scenario without '70
1'~
a credible preceding incident such as a seismic event.
7Z/
5.
The events are valid with regard to physics and thermodynamics.
7~ -IZ..-
\\~
6.
Sequencing and timing of events is reasonable, and allows the examination team to obtain complete '76
'j~
evaluation results commensurate with the scenario objectives.
-rt>>
7.
If time compression techniques are used, the scenario summary clearly so indicates.
Operators
/'-5 Jl;
\\,,~
have sufficient time to carry out expected activities without undue time constraints.
8.
The simulator modeling is not altered.
?~ ri- ~
9.
The scenarios have been validated. Pursuant to 10 CFR 55.46(d), any open simulator performance
deficiencies or deviations from the referenced plant have been evaluated to ensure that functional
/~ 71J ~
fidelity is maintained while running the planned scenarios.
10.
Every operator will be evaluated using at least one new or significantly modified scenario. All other
:7~
~
scenarios have been altered in accordance with Section 0.5 of ES-301.
1V
11.
All individual operator competencies can be evaluated, as verified using Form ES-301-6 (submit the
-/:5
.~
form along with the simulator scenarios).
jJ../
12.
Each applicant will be significantly involved in the minimum number of transients and events
-;!~
~~
specified on Form ES-301-5 (submit the form with the simulator scenarios).
TL/
13.
The level of difficulty is appropriate to support licensing decisions for each crew position.
76 ~ '{'(lD
Target Quantitative Attributes (Per Scenario; See Section D.5.d)
Actual Attributes
-
-
-
1
2
3
4
1.
Total malfunctions (5-8)
8/
16""' 7/ '16/ -;f~ -;L; Mf:,
2.
Malfunctions after EOP entry (1-2)
2""'
1...-- 72/ ;2/ /~
-rc; ~
3.
Abnormal events (2-4)
3""-
3"
4/
3/
.~
"T/.J
l~~
4.
Major transients (1-2)
1/
1v
1 /
1/ /,:) /L
i:~ID
5.
EOPs entered/requiring substantive actions (1-2)
1,/
1/
1/
1/ ?5
'17- "rib
6.
EOP contingencies requiring substantive actions (0-2)
1v
0,/
1/
1/ 7'7
7tr- ~
7.
Critical tasks (2-3)
2/
3v 2/
2/ 7~ -rt- vWJ3
NUREG-1021
Revision 9
 
ES-301
Transient and Event Checklist
Form ES-301-5
(
(
(
Facility:
Sequoyah 1 & 2
Date of Exam:
1/28/2008
Operating Test No.:
NRC
A
E
Scenarios
P
V
P
E
1
2
3
4
T
M
L
N
Spare
0
I
I
T
T
N
CREW
CREW
CREW
CREW
C
POSITION
POSITION
POSITION
POSITION
A
I
A
T
L
M
N
Y
U
T
P
M(*
E
S
A
B
S
A
B
S
A
B
S
A
B
R
I
U
R
T
0
R
T
0
R
T
0
R
T
0
0
C
P
0
C
P
0
C
P
0
C
P
RX
0",,-
1
1
1
1
0
NOR
1/
I
0
1
1
1
1
SROU
I/C
,\\5/
Z
3
8
4
4
2
MAJ
1/
i
0
1
2
2
1
TS
3/
c
0
3
0
2
2
RX
1/
0/
1
1
1
0
NOR
Ov
1/
1
1
1
1
SROI-1
I/C
3/
5/
8
4
4
2
0
MAJ
1v
1 v
2
2
2
1
TS
0
3/
3
0
2
2
RX
0
1/
0
1
1
1
0
NOR
I
0"
1
1
1
1
1
SROI-2
I/C
Y
4/
7
11
4
4
2
MAJ
f
1 v
2
3
2
2
1
TS
~
Ov
2
2
0
2
2
0
1
0
1
1
1
0
1
0
1
2
1
1
1
NA
7
5
3
15
4
4
2
1
1
1
3
2
2
1
2
0
0
2
0
2
2
1
1
0
1
1
1
4
4
2
2
2
1
0
2
2
NUREG 1021
Revision 9
 
ES-301
Transient and Event Checklist
Form ES-301-5
(
Facility:
Sequoyah 1 &2
Date of Exam:
4/9/2007
Operating Test No.:
NRC
A
E
Scenarios
P
V
P
E
1
2
3
4
T
M
L
N
Spare
0
I
I
T
T
CREW
CREW
CREW
CREW
N
C
POSITION
POSITION
POSITION
POSITION
A
I
A
T
L
M
N
Y
U
T
P
M(*
E
S
A
B
S
A
B
S
A
B
S
A
B
R
I
U
R
T
0
R
T
0
R
T
0
R
T
0
0
C
P
0
C
P
0
C
P
0
C
P
1
1
0
1
1
1
4
4
2
2
2
1
0
2
2
1
1
0
1
1
1
4
4
2
2
2
1
0
2
2
1
1
0
1
1
1
4
4
2
2
2
1
0
2
2
Instructions:
1.
Circle the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event
type; TS are not applicable for RO applicants. ROs must service in both the "at-the-controls (ATC)" and
"balance-of-plant (BOP)" positions; Instant SROs must do one scenario, including at least two instrument or
component (I/C) malfunctions and one major transient, in the ATC position.
2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section
D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be
replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3.
Whenever practical, both instrument and component malfunctions should be included; only those that require
verifiable actions that provide insight to the applicant's competence count toward the minimum requirements
specified for the applicant's license level in the right-hand columns.
This matrix assumes that Scenario 3 is used as the spare. If scenario 3 is used in combination with any
other scenario, the minimum requirements are still met for each applicant.
NUREG 1021
Revision 9
 
ES-301
Competencies Checklist
Form ES-301-6
(
(
Facility: Sequoyah 1 & 2
Date of Exam:1/28/2008
Operating Test No.: NRC
SRO
RO (ATC)
BOP/CRO
Competencies
SCENARIO
SCENARIO
SCENARIO
1
2
3
4
1
2
3
4
1
2
3
4
Interpret/Diag-
2,3,6,
3,4,5,
3,4,5,
2,5,6,
1,2,3,
2,5,6,
3,4,5,
nose Events
2-9
1-7,9
2-9
2-9
9
6,7,9
6,8,9
7,8
4-8
4,7,8
7
9
and Conditions
Comply With
1,2,3,
3,5,6,
1,3,4,
1,2,5,
1,4,5,
1,2,3,
1,2,6,
1,3,4,
and Use
ALL
ALL
ALL
ALL
6,8,9
9
5,6,8,
6,7,8
6,8
5,7
7
5,6,7,
Procedures (1)
9
9
Operate
1,2,3,
3,5,6,
1,3,4,
1,2,5,
1,4,5,
2,3,5,
1,2,6,
1,3,4,
Control Boards
N/A
N/A
N/A
N/A
6,8,9
9
5,6,8,
6,7,8
6,8,7
7
7
5,6,7,
(2)
9
9
Communicate
1,2,3,
1,3,4,
1,3,4,
and
ALL
ALL
ALL
ALL
6,8,9
3,4,5,
5,6,8,
1,2,5,
1,4,5,
1,2,3,
1,2,5,
5,6,7,
6,7,9
6,7,8
6,8,7
4,7,8
6,7
Interact
9
9
Demonstrate
Supervisory
ALL
ALL
ALL
ALL
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Ability (3)
Comply With
and Use Tech.
2-4
1,2,4
3,4
2,3
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Specs. (3)
Notes:
(1)
Includes Technical Specification compliance for an RO.
(2)
Optional for an SRO-U.
(3)
Only applicable to SROs.
Instructions:
Circle the applicants' license type and enter one or more event numbers that will allow the
examiners to evaluate every applicable competency for every applicant.
NUREG-1021
Revision 9
 
ES-401
Written Examination Quality Checklist
Form ES-401*6
~-CilitY:5(~~uoyah u s:
Date of Exam: 1/;1.008
Exam Level' RO .:*iSRO~1
..
Initial
Item Description
a
b*
c'
--;15
-
1
Questions and answers are technically accurate and applicable to the facilitv.
71r-J ~
2.
o .
NRC KJAs are referenced for all questions.
-;s
J}--/ rrIf?
b.
Facility learning objectives are referenced as available.
3.
SRO guestions are appropriate in accordance with Section D.2.d of ES-401
--J6
-rz,J
v'v'R>
-
....
4
The sampling process was random and systematic (If more than 4 RO or 2 SRO questions
% 1P ~
were repeated from the last 2 NRC licensmp exams, consult the NRR OL program office).
5.
Question duplication from the license screening/audit exam was controlled
as indicated below (check the item that applies) and appears appropriate:
_
the audit exam was systematically and randomly deveioped; or
_
the audit exam was completed before the license exam was started; or
76 JZJ ~
__ the examinations were developed independently; or
"Jf.- the licensee certifies that there is no duplication; or
__ other (explain)
----------_._-
Ban:-r Mcditied
6.
Bank use meets limits (no more than 75 percent
New
from the bank, at least 10 percent new, and the rest
;5/~-r;3 ~
25
/'6 "f1J fYIf;>
new or modified); enter the actual RO / SRO-only
,J,7 I IS
r----
question distribution(s) at right.
7.
Between 50 and 60 percent of the questions on the RO1MClnory
CIA
exam are wntten at the comprehension/ analysis level,
-15
the SR.O exam may exceed 60 percent If the randomly
-n> ~
selected K/As support the hiqhe: cognitive levels, enter
3 c;
/ 7
i70
/ la
the actual RO I SRO question distributiorus) at light
J
8.
References/handouts provided do not give away answers
-;:5 7lr/ IVS
or aid in the elimination of distractors.
9.
Question content conforms with specific K/A statements in the previously approved
examination outline and is appropriate for the tier to which they are assigned;
/6 .-fl-/
/'if:>
~.
deviations are justified.
10.
Question psychometric quality and format meet the guidelines in ES Appendix B.
-/~
--y1--
1W1S
11
The exam contains the required number of one-point, multiple choice items;
-D 11P ~~
the total is correct and agrees with the value on the cover sheet.
____
Printed Name / ~nat~~
Date
a. Author
210mm
O:'IV~'> / '/L/
-
v----:=:-
//1/ot'
b. Facility Reviewer (*J
-Z;Z~~...
/././/6'-
/~~ /'.;, /Z
fft;
c. NRC Chief Examiner (#)
~ It BtrT$/ ff;["J (j, I '" .J;:-:...
d
NRC Regional Supervisor
J..!J4<AUJ---r:. WttiJ)NV.t>J /
~
.
~
(
.
"----'"
"
Note:
* The facility reviewer's initials/signature are not applicable for NRC-developed examinations.
# Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.
ES-401, Page 30 of 34
 
ES-401, Rev. 9
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KiA#
B
L
L
Psychometric Flaws
Content Flaws
U
Comment
M
0
0
Stem
Cues
T/F
1 Non
>1 Non
Partial
Min
Q~
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KiA
Only
S
Dist
Dist
BIW
GENERAL COMMENTS
B= Bank 1M=Modified 1N-New 1F-Fundamental Level (I.E. Memory) 1H-Higher Cognitive Level (I.E. CIA)
I
For All BANK questions: swap the order of the answer choices so that applicants cannot rely on recall of the correct answer location.
ROEXAM
I
007EAl.08
N
H
2
B
Can the first two bullets be replaced with the following single bullet:
"Unit I was at 10% power when both MFPTs tripped."
S
First bullet revised. Second bullet not changed. The teaching in the
second bullet does not affect the a11SWerS to this question or any other
questions. OK MAB 02/04/2008
Can the third bullet read as follows:
"Stearn generator levels dropped to a minimum of##% and then began to
rise." - (use a level that is a couple ofpercent above the AFW start signal)
Incorporated. OK MAB 02/0412008
l
.'
Is there an extra space in the correct answet between "controlled" and
"manually"? Fixed OK MAB 02/0412008
Is there an extra space in "A" and "B" between "required" and "to"?
Fixed OK MAB 02/04/2008
2
008AA2.29
N
H
2
B
Be consistent with periods in answer choices. Fixed. OK MAB
02/0412008
02/0412008
l.'Isthereanextraspaceinthecorrect
S
answet between"controlled" and"manually"?FixedOKMAB
Does the cause of the lowering RCS pressure affect which answer is
02/0412008Isthereanextraspacein"A" and"B" between"required" and"to"?FixedOKMAB
correct? Is it important to state that pzr pressure is inadvertently lowered
02/04/2008
with pzr sprays or that the safety leakage rises, etc? If the pressure drop
2 008AA2.29NH 2 BBeconsistentwithperiodsinanswerchoices.Fixed.OKMAB
results from a problem elsewhere, then the level behavior may change.
02/0412008
Discuss with licensee.
SDoesthecauseoftheloweringRCSpressureaffectwhichansweriscorrect?Isitimportanttostatethatpzrpressureisinadvertentlyloweredwithpzrspraysorthatthesafetyleakagerises,etc?Ifthepressuredropresultsfromaproblemelsewhere,thenthelevelbehaviormaychange.Discusswithlicensee.Licenseeagreed.Commentincorporated.OK
Licensee agreed. Comment incorporated. OK
MAB 02/04/2008
MAB 02/04/2008
3 009EA2.24 N H 2 BThereisnopointinstatingthereasonwhytheRCPsarerequiredtobetripped.Considerthefollowingsuggestionfortheanswerchoices:
3
S A.ALLRCPsarerequiredtobetripped.PageI of29  
009EA2.24
ES-401,Rev.
N
9 WrittenExamReview
H
Worksheet Sequoyah 2008-301FormES-401-9
2
Q#KJA#BLL Psychometric
B
Flaws Content Flaws U Comment M00StemCues T/F1Non>1Non Partial Min Q=SRO E Explanation
There is no point in stating the reason why the RCPs are required to be
NKD FocusCredCred KJA Only SDis!Dis!BIW B.ONLYRCP#1and#3are
tripped. Consider the following suggestion for the answer choices:
requiredtobetripped.
S
C.ONLYRCP#1is
A.
requiredtobetripped.
ALL RCPs are required to be tripped.
D.ONLYRCP#3is
Page I of29
requiredtobetripped.
 
Incorporated.OKMAB 02/04/2008
ES-401, Rev. 9
4 01lEK3.13BF2 B Change answer choices to: A.RealignstheECCS
Written Exam Review Worksheet
suctionpathfromtheRWSTtothe
Sequoyah 2008-301
S contairunent
Form ES-401-9
sump.B.No change needed C.Nochange needed D.RealignstheECCSflowto
Q#
prevent boron precipitation.
KJA#
Incorporated
B
for"D".LicenseeandCEagreedonchangefor"A".OK MAB 02/0412008
L
5 015/017BH2SSuggestmakingslight
L
modification
Psychometric Flaws
to"C" and"D": AK2.08 C.TheRCP statorwindingswilloverheat.D.TheRCPmotorbearingswill
Content Flaws
overheat.Incorporated.OKMAB 02/04/2008
U
6 022AA2.03BH2 X?B Have licensee explain the mechanism for"A"tooccur.Ineedto
Comment
better understandthefailure
M
mechanismthatcan cause the chargingtogoto120 Sgpmandthen
0
retum to normal with pressurizerlevelalso returning to nonna!.Licensee modified"A" based on comment.OKMAB 02/04/2008
0
7 025AK2.05MH2 X?Y"B"and"D" plausibility:Whywoulditbe
Stem
plausibleforan applicant to ii+believethatspraypumpswouldbe
Cues
drawingsuctionfromthesumpwhen
T/F
,thereis68%
1 Non
remainingintheRWST?Also,whywouldan
>1 Non
applicant Sbelievethatsuctionforthespraypumpswouldbefromthesumpwhentheyarein ECA-I.I.If adequatelevelexistedinthesumpandspraypumpsare operatingwhywouldtheybein
Partial
ECA-I.I?Parametersinthestem changedtoaddresstheseconcerns.Thechangesto
Min
the parameters
Q=
also caused the correctanswertochange.OKMAB
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KJA
Only
S
Dis!
Dis!
BIW
B.
ONLY RCP #1 and #3 are required to be tripped.
C.
ONLY RCP #1 is required to be tripped.
D.
ONLY RCP #3 is required to be tripped.
Incorporated. OK MAB 02/04/2008
4
01lEK3.13
B
F
2
B
Change answer choices to:
A.
Realigns the ECCS suction path from the RWST to the
S
contairunent sump.
B.
No change needed
C.
No change needed
D.
Realigns the ECCS flow to prevent boron precipitation.
Incorporated for "D". Licensee and CE agreed on change for "A". OK
MAB 02/0412008
5
015/017
B
H
2
S
Suggest making slight modification to "C" and "D":
AK2.08
C.
The RCP stator windings will overheat.
D.
The RCP motor bearings will overheat.
Incorporated. OK MAB 02/04/2008
6
022AA2.03
B
H
2
X?
B
Have licensee explain the mechanism for "A" to occur. I need to better
understand the failure mechanism that can cause the charging to go to 120
S
gpm and then retum to normal with pressurizer level also returning to
nonna!.
Licensee modified "A" based on comment. OK MAB 02/04/2008
7
025AK2.05
M
H
2
X?
Y
"B" and "D" plausibility: Why would it be plausible for an applicant to
ii
+
believe that spray pumps would be drawing suction from the sump when
,
there is 68% remaining in the RWST? Also, why would an applicant
S
believe that suction for the spray pumps would be from the sump when
they are in ECA-I.I. If adequate level existed in the sump and spray
pumps are operating why would they be in ECA-I.I ?
Parameters in the stem changed to address these concerns. The changes to
the parameters also caused the correct answer to change. OK MAB
02/04/2008
02/04/2008
This question containsoverlapflawswith
This question contains overlap flaws with questions on the SRO exam.
questionsontheSROexam.Thisquestion
This question provides information that indicates that E-Ois entered upon a
provides informationthatindicatesthatE-Oisenteredupona
reactor trip. I think this comment could alleviate itself ifthe issues on the
reactortrip.Ithinkthis
SRO exam are resolved. Concern addressed on SRO exam. OK MAB
comment could alleviate itself iftheissuesontheSROexamareresolved.
Concern addressedonSROexam.OKMAB
02/0412008Adda periodafterthe sentenceat08:0 l.Fixed.MAB 02/04/2008Doesthe informationinthestem preclude an applicant from assuming that containment
pressurecouldhavebeengreaterthan12psidandhasnow
decreasedto9.7psid?
Ifthisisan assumptionthatthe applicants
arePage2 of29
ES-401,Rev.9
WrittenExamReview
Worksheet Sequoyah 2008-301FormES-401-9
Q#KiA#BLL Psychometric
Flaws Content Flaws U Comment M 0 0 Stem Cues T/F1Non>1Non PartialMinQ=SRO E Explanation
NKD FocusCredCred KiA Only SDistDist B/Wforcedtomake,woulditchangethecorrectanswer.Istherea
possible argumentthattherearetwo
correctanswerstothis
questionbasedonforcingthe
applicanttomake assumptions?
Qnestion statementhasbeen enhanced to preclnde an assnmptionthatconldmaketwoanswerscorrect.Thereis enoughinfointhestemto
preclnde applicantshavinganeedtomakeany assumptions
on containmentpressure.OKMAB
02/04/2008
8 026AK3.03 BF2 x E"B" and"C"arereallythesamedistractor.Theybothstateto
reduce heatload,or minimizeheatload."C"impliesthatRCPsmustnotbeneededif
Stheyarenotcooledto
maintainCCSwithindesigncapability.
One ofthesetwo distractorsshouldbe modified/replaced."B"hasbeen changedtoaddress concem.OKMAB 02/04/2008
9 027AAI.02BH 2 E"start"shouldbepluralintheanswerchoices.Fixed.OKMAB
02/04/2008
SDeletethe piece ofeachanswerchoicethatstatesthatheaters
ENERGIZE or DEENERGIZE.Thisisnot neededtomakeanswerchoicesunique.I.E.
A.Pressurizer
PressureHIalarm annunciates.
Actual pressurizer
pressurestartstorise.Etc.fortherest
oftheanswerchoices.
Incorporated.OKMAB 02/04/200810038G2.1.3NF2 E Technical accuracy of"A"and"B":Istherea
requirementtocooltheplantpriorto
tumover?The supporting
documentationdoesnot support Sthis.The supporting
documentation
supportsthatthe cooldownisnot J.!permittedtobe performedbyan operatorwhois simultaneously
" conducting
tumover.Thisis different than requiringthatthe cooldowntakeplacepriorto
tumover.TIlemore precisewayto phrasethiswouldbetostatethe
converse ofwhatisstatedin"C"and"D".I.E.An
operator is not permitted to simultaneously
tumover and performthecooldown.
Incorporated.OKMAB 02/04/2008Firstpart of"C" and"D"alsoneeds wording enhancements
because OPDP-Iwouldnot provide direction to cooldown while ccncurrently
performing
tumover.OPDP-I provides Administrative
guidance, not guidancethatisspecifictotheSGTRaccident.Consider:
An operator is permitted to simultaneously
turnover and performthecooldown.
Incorporated.OKMAB 02/04/2008
II 040AKI.03 BF2 x:yKIAMatch:The
IvArequirestesting
knowledge of operational
implications
ofRCSshrinkand
depressurizationastheyapplytosteam
Slinebreak.This
question tests knowledge of brittlefailurewhichstemsfromanRCS cooldown and subsequent
pressurization.NewQwritten.OKMAB
02/04/2008Page3 of29
ES-401,Rev.9
WrittenExamReview
Worksheet Sequoyah 2008-301FormES-401-9
Q#KlA#BLLPsychometricFlawsContentFlaws
U Comment M00 Stem CuesT/F1Non>1NonPartial
Min Q-SRO E Explanation
NKD FocnsCredCred KIA Only S Dist Dist B/W This question has otherissueswith
distractors, but because oftheabove comment,thereisnoneedto
address these commentsatthistime.
New Qwritten.OKMAB
02/04/2008
12 055G2.4.29NF I-x.yIsthe19:30
bullet worded correctly?
2 Q replaced.OKMAB 02/04/2008
S Punctuation
in answerdoesnot appeartobecorrect, Q replaced.OKMAB 02/04/2008
KIA not Matched: The KIA requiresaSBO.Doesthis
question test knowledge ofaSBO,or just knowledge of a security threat?ThewayIreadthis questionisthatyou coulddeleteallthe
informationinthestem and simplystatethatthereisa
credible insider securityt1ueatanditis
necessary to dispatch an operatortotheEDGroom.In
otherwords,the LOOP appearstobe irrelevant.
Q replaced.OKMAB 02/04/2008
13 056AKI.03 B H I-x.g Be consistent
with periods afterbullets.Fixed.OKMAB
02/04/2008
2 S Replace"D"withthe logicalerrorthatwouldresultfrom
subtracting15psifrom2085.Incorporated.OKMAB 02/04/2008
Consider combining the subtraction
of15psiandtileuse
ofThot to replace"e".Incorporated.OKMAB 02/04/2008
Technically
this questioncouldberatedasU,butthefixis
simple enoughthatitisbeing
rated as E.Theabove comment incorporationwillhelpto
maketheLODmore
acceptable.Aswritten,two
distractersarenot plausible.
Itisnot reasonablefora licensed operatortouse TcoldorTaveina subcooling
calculation.
Noted.Issues addressed.OKMAB 02/04/2008
14 058AK1.01 B H 2.gAfter4 hourswouldthe batteries be discharged?Oristherea
requirementthatonly statesthatthe batterieswillnotbe discharged
priorto4hours?SWeneedtoensurethatthe
aIISWer choices accurately
representthestatus of the batteries.
Concems addressed by changingthewording.OKMAB
02/04/2008
15 062AA1.01MF2 S QisSAT.16 W/E04 BFI-xX?.g Be consistent
with periodsinthe aIISWer choices.FixedOKMAB
G2.4.28 2'I 02/04/2008Page4 of29
ES-401,Rev.9
WrittenExamReview
Worksheet Sequoyah 2008-301FormES-401-9
Q#KlA#BLL Psychometric
Flaws Content Flaws U Comment M00 Stem Cues T/F1Non>1Nou Partial Miu Q-SRO E Explanation
N K D FocusCrcdCrcd KIA Only SDistDist B/W S Distractor"A"isnot plausible.ECCSflowisanindirect
parameter, whichwillfollowRCSpressure,whichisanswer
choice"DO'.Itdoesnothave
the procedure guidance to monitor the indirect parameter(ECCSflow)whenthedirect
parameter is available(RCSP).Concern addressed.OKMAE 02/04/2008Ialsohavesomeissueswith"B" because subcooling
is calculated
fromRCSpressure.
Itmakesnosenseto
monitor the calculated
parameter whenthedirect parameterisavailable.
Concern addressed.OKMAB 02/04/2008Theonlythingthatmakes"A" and"B" incorrectisthatthe procedure doesnotstatethese
parameters,buttheywouldworkasa
method for determining
iftheleakwasisolated.Noted.
MAB 02/04/2008TheKIAdoesnot
restrictthisquestiontobewrittentotestleakisolation.Noted.MAB 02/0412008
17 W/E05BF2 X?EHowis"A" different from"D"?Arethese unique answer choices?It EK3.1 should be possibletomodifythe
wording ofthesetwo distractorstoensure Sthattheyareunique,I.E.,"A"couldbe pertainingtohigh temperatures
and"DO'couldspeaktocoldwaterondrytubesasis
suggestedinthe distractor
analysis.Wording in"DO'enhancedtoensure uniqueness
ofanswerchoice.OKMAB
02/04/2008
18 W/EllMH 1 x Y Questiondoesnot discriminateatthe licensed operatorlevel.Thisisa
EK2.2 h questionthat,when provided the reference, almost anyonecouldarriveat
REFSthecorrectanswer.
i Following suggestion
incorporated.OKMAB 02/04/2008
Suggestiontoimprovequestion:Usemost ofthesameitemsinthestem.Somecanbedeletedifthey
become unnecessary,Q:Whichone
ofthe following correctly describestheflowratethatmeetstheintent of ECA-l.1,Step20RNO?
A.Establish325gpmECCSflow.ECCSpumpsmaybestartedandstoppedas
necessary to accomplishthedesiredflowrate.
B.Establish325gpmECCSflow.ECCSpumpsarenot
permittedtobestartedand
stopped as necessary to accomplishthedesiredflowrate.C.Establish400gpmECCSflow.ECCSpumpsmaybestartedandstoppedas
necessary to accomplishthedesiredflowrate.
D.Establish400gpmECCSflow.ECCSpumpsarenot
permittedtobestartedand
stopped as necessary to accomplishthedesiredflowrate.This suggestionraisesthe plausibility
ofthe distractorsandstilltestsPage5 of29
ES-401,Rev.9
WrittenExamReview
Worksheet Sequoyah 2008-301FormES-401-9
Q#KlA#BLLPsychometricFlawsContentFlaws
U Comment M00 Stem Cues T/F1Non>1NonPartialMinQ=
SRO E Explanation
N K D Focus Cred Cred KIA Only SDistDist B/W whether the applicants
understandtheintentofthe
procedure step.Suggestion
incorporated.OKMAB 02/04/2008
19 001AK2.05 M H 1-B Be consistentwithperiods
behindbulletedphrases.Fixed.OKMAB
2 02/04/2008
SWouldthequestionbeenhancedifone
oftheThotorTcold
instrumentsweretofailinstead
oftheTavg auctioneeringunit?Discusswithlicensee.
Decidednottomakeachangeontempinst.OKMAB
02/04/2008
20 033G2.4.2lMF2 SQisSAT 21 036AKl.OlNF 2 S Maintainpasttenseinthirdbullet.
Somewhat incorporated,butitdoesnot
affect technical accuracy ofquestion.OKMAB
02/04/2008
Questioniswritteninthe"NOT'format,whichis
discouraged
by NUREG-l02l.
This question can remaininitscurrentformaslongasthe
licenseeagreesthatthe
questionbeinginthisformatwillnotaffect
applicant performance.
Inotherwords,theirapplicantshaveseen
questionsinthisformatandwouldnotgetthe
incorrectanswerforanyotherreasonthana
knowledge weakness.Noted.OKMAB
02/04/2008
22 060AAl.02 MF2 X?x lei KIAMatch:Havethe
licensee provide an explanation
ofhowthe KIA ismatched.The
KIArequirestesting
knowledge ofhowto operate or S monitor ventilationsystemsduringan
accidental
gaseous radwaste release.:1'Howisa ventilationsystembeing
monitored?RadMntrispart
of the ventilation
system.KIAmatchisOK.MAB
02/04/2008WhenwouldtheWasteGasRad
MonitornotdetectaleakfromaWaste
Gas Decay Tank?Changedstemtoaflangeleakwhichwouldnot
causetheWasteGasRadMntrtoalarm.OKMAB
02/0412008
02/0412008
23 069G2.4.45NH 2 B Technical accuracy ofthequestionisa
Add a period after the sentence at 08:0 l. Fixed. MAB 02/04/2008
concern becausetheydonothavetorestore integrity within1hour.Iftheydonotrestore
Does the information in the stem preclude an applicant from assuming that
integritywithin1 Shour,thentheyarerequiredtoshutdown.TIleanswer
containment pressure could have been greater than 12 psid and has now
choicesneedtobe more preciseinordertobe
decreased to 9.7 psid? Ifthis is an assumption that the applicants are
technically
Page 2 of29
correct.Wording enhancementsmadeto specificallyaskforwhattheAction
 
Statementstates.OKMAB
ES-401, Rev. 9
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KiA#
B
L
L
Psychometric Flaws
Content Flaws
U
Comment
M
0
0
Stem
Cues
T/F
1 Non
>1 Non
Partial
Min
Q=
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KiA
Only
S
Dist
Dist
B/W
forced to make, would it change the correct answer. Is there a possible
argument that there are two correct answers to this question based on
forcing the applicant to make assumptions? Qnestion statement has been
enhanced to preclnde an assnmption that conld make two answers correct.
There is enough info in the stem to preclnde applicants having a need to
make any assumptions on containment pressure. OK MAB 02/04/2008
8
026AK3.03
B
F
2
x
E
"B" and "C" are really the same distractor. They both state to reduce heat
load, or minimize heat load. "C" implies that RCPs must not be needed if
S
they are not cooled to maintain CCS within design capability.
One ofthese two distractors should be modified/replaced. "B" has been
changed to address concem. OK MAB 02/04/2008
9
027AAI.02
B
H
2
E
"start" should be plural in the answer choices. Fixed. OK MAB
02/04/2008
02/04/2008
24 074EK3.07 BF1 x leiLOD=1: Distractorsarenot plausible.Duetothe non-credible
S
distractors, this questiondoesnot discriminateatthe appropriateleveltomakea
Delete the piece of each answer choice that states that heaters ENERGIZE
S licensing decision.Changeddistractors.OKMAB
or DEENERGIZE. This is not needed to make answer choices unique. I.E.
A. Pressurizer Pressure HI alarm annunciates. Actual pressurizer pressure
starts to rise.
Etc. for the rest ofthe answer choices.
Incorporated. OK
MAB 02/04/2008
10
038G2.1.3
N
F
2
E
Technical accuracy of "A" and "B": Is there a requirement to cool the
plant prior to tumover? The supporting documentation does not support
S
this. The supporting documentation supports that the cooldown is not
J.!
permitted to be performed by an operator who is simultaneously
"
conducting tumover. This is different than requiring that the cooldown
take place prior to tumover. TIle more precise way to phrase this would be
to state the converse ofwhat is stated in "C" and "D". I.E. An operator is
not permitted to simultaneously tumover and perform the cooldown.
Incorporated. OK MAB 02/04/2008
First part of "C" and "D" also needs wording enhancements because
OPDP-I would not provide direction to cooldown while ccncurrently
performing tumover. OPDP-I provides Administrative guidance, not
guidance that is specific to the SGTR accident. Consider: An operator is
permitted to simultaneously turnover and perform the cooldown.
Incorporated. OK MAB 02/04/2008
II
040AKI.03
B
F
2
x
:y
KIA Match: The IvA requires testing knowledge of operational
implications of RCS shrink and depressurization as they apply to steam
S
line break. This question tests knowledge ofbrittle failure which stems
from an RCS cooldown and subsequent pressurization.
New Q written. OK MAB 02/04/2008
Page 3 of29
 
ES-401, Rev. 9
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KlA#
B
L
L
Psychometric Flaws
Content Flaws
U
Comment
M
0
0
Stem
Cues
T/F
1 Non
>1 Non
Partial
Min
Q-
SRO
E
Explanation
N
K
D
Focns
Cred
Cred
KIA
Only
S
Dist
Dist
B/W
This question has other issues with distractors, but because ofthe above
comment, there is no need to address these comments at this time.
New Q written. OK MAB 02/04/2008
12
055G2.4.29
N
F
I-
x
.y
Is the 19:30 bullet worded correctly?
2
Q replaced. OK MAB 02/04/2008
S
Punctuation in answer does not appear to be correct,
Q replaced. OK MAB 02/04/2008
KIA not Matched: The KIA requires a SBO. Does this question test
knowledge ofa SBO, or just knowledge of a security threat? The way I
read this question is that you could delete all the information in the stem
and simply state that there is a credible insider security t1ueat and it is
necessary to dispatch an operator to the EDG room.
In other words, the
LOOP appears to be irrelevant.
Q replaced. OK MAB 02/04/2008
13
056AKI.03
B
H
I-
x
.g
Be consistent with periods after bullets. Fixed. OK MAB 02/04/2008
2
S
Replace "D" with the logical error that would result from subtracting 15 psi
from 2085.
Incorporated. OK MAB 02/04/2008
Consider combining the subtraction of 15 psi and tile use ofThot to replace
"e".
Incorporated. OK MAB 02/04/2008
Technically this question could be rated as U, but the fix is simple enough
that it is being rated as E. The above comment incorporation will help to
make the LOD more acceptable. As written, two distracters are not
plausible. It is not reasonable for a licensed operator to use Tcold or Tave
in a subcooling calculation.
Noted. Issues addressed. OK MAB 02/04/2008
14
058AK1.01
B
H
2
.g
After 4 hours would the batteries be discharged? Or is there a requirement
that only states that the batteries will not be discharged prior to 4 hours?
S
We need to ensure that the aIISWer choices accurately represent the status
ofthe batteries. Concems addressed by changing the wording. OK MAB
02/04/2008
02/04/2008
Reflux boilingisa cooling methodusedwhenRCPsareoff.Howwoulditbe
15
reasonableforan operatortothinkthatstartinganRCPPage6 of29
062AA1.01
ES-401,Rev.9
M
WrittenExamReview
F
Worksheet Sequoyah 2008-301FormES-401-9
2
Q#KJA#BLLPsychometricFlawsContentFlaws
S
U Comment M00 StemCnesT/F1Non>1NonPartial
Q is SAT.
Min Q-SRO E Explanation
16
N K D FocusCredCred KJA Only SDistDist B/Wwouldkeep pressurefromrising?
W/E04
Changeddistractor.OKMAB02/04/20082S076AK2.01B
B
H I x tf A pinhole leak ofafuelassemblywouldbeevidentinRCSsamplesthat
F
are analyzedforvariousisotopes;however,smallleakswillnotnecessarily
I-
Sresultinrising
x
radiationmonitortrends.Thereareconcernswith"B"beingan altematecorrectanswer
X?
becausethesizeoftheleakisnotdefined.Also,theRCSleakagelocationsarenotdefmed,sotherearealso
.g
concemsaboutwhetherasmallRCSleakwouldresultinarisingradmonitorreading."Significant
Be consistent with periods in the aIISWer choices. Fixed OK MAB
increaseinRCS activity"addedtostem.OKMAB
G2.4.28
02/04/2008LOD=I:Distractorsarenotplausible.Duetothe
2
non-credible
'I
distractors, this questiondoesnot discriminateatthe appropriateleveltomakealicensingdecision.
Questionisonthecusp
of being unacceptableduetolowLOD.Noted.MAB02/04/2008
Considerwritinga questionthathasaplant
nipandaSGTL.Thiswill
allow testingMSLmonitorsaswellas
Condenser OffGasMonitors.Thisideamayhelptoraisethequestiontoalevelwhereitcouldbeusedto
discriminatebetweena competentandlessthan
competent licensed operator.Not incorporated.AllowedbyCEoTherest
oftheexamisatan
acceptableleveltonotwarrantachangetothisquestion.OKMAB
02/04/2008
02/04/2008
26W/E09B H 2 B The"repressurization"pieceof"A"and"B"shouldbedeleted.
Page 4 of29
Itdoesnot EA2.1 add informationthatisneededtomaketheseanswerchoicesunique.
 
SDiscusswithlicensee.Deleted.OKMAE02/04/2008
ES-401, Rev. 9
Consider rewordingthequestionasfollows:Whichone ofthefollowingcorrectlystatesthe
Written Exam Review Worksheet
procedurethatmaximizestheallowable
Sequoyah 2008-301
cooldownratefortheprovided
Form ES-401-9
circumstancesandthe maximum cooldownrateallowedbythat
Q#
procedure?
KlA#
A.UseES-0.2,Natural
B
Circulation
L
Cooldown.Thecooldownlimitis SOF/hr.B.UseES-0.2,Natural
L
Circulation
Psychometric Flaws
Cooldown.Thecooldownlimitis100F/hr.
Content Flaws
C./UseES-O.3,Natural
U
CirculationCooldownwithSteamVoidsinVessel(withRVLSI).The
Comment
cooldownlimitis SOF/hr.D.UseES-O.3,Natural
M
CirculationCooldownwithSteamVoidsinVessel(withRVLSI).The
0
cooldownlimitisSOF/hrIncorporated.OKMAE02/04/2008Page7 of29
0
ES-401,Rev.9
Stem
WrittenExamReview
Cues
Worksheet Sequoyah 2008-301FormES-401-9
T/F
Q#KlA#BLLPsvchometricFlawsContentFlaws
1 Non
U Comment M00StemCuesT/F1Non>1NonPartialMinSRO E Explanation
>1 Nou
N K D FocusCredCred KIAOnlySDistDist B/W 27 W/EI4BF2SQisSAT.EA2.2 28 003K3.04BH2SQisSAT.29 003G2.3.10NF2SQisSAT.30 004K5.26NH 2SQisSAT.31 004A3.08BHI-X B"D":itisnot
Partial
credibleforan applicanttomakethiserror.
Miu
Thereisno 2 division neededinthis calculation.
Q-
S Consider making"D" 60%.Discuss with licensee Incorporated.OKMAB 02/04/2008
SRO
32 005A4.03BH I-x:y"RCS cooldownrateistoo high"-whatdoesthis
E
mean?Itmaynot 2matter,butitwouldbe
Explanation
better to provide the applicant with information
N
that S they would normally have availabletothem,suchasanactual
K
temperatureattwo different times.Itmayalsobe necessarytostatethatSROgave
D
them direction to cooldownata certainvalue.The question piece wouldneedto change slightlytoaskforthe
Focus
actions needed to complywiththe SRO's directions.(These changes will make"C" plausible)
Crcd
Q replaced.OKMAB 02/04/2008
Crcd
Question shouldbetiedtothe
KIA
procedure.
Only
I.E.Which one of the following.....CONSTANTRHRflow,in
S
accordance
Dist
with 0-SO-74-1,"procedure
Dist
title"?Q replaced.OKMAB 02/04/2008"A"and"B"donot contain credible misconceptions
B/W
to discriminate
S
between competentandlessthan
Distractor "A" is not plausible. ECCS flow is an indirect parameter, which
competent licensed operators.
will follow RCS pressure, which is answer choice "DO'. It does not have
Q replaced.OKMAB 02/04/2008
the procedure guidance to monitor the indirect parameter (ECCS flow)
33 006KI.02 MF2 BIsthereanextra
when the direct parameter is available (RCS P).
space between"SSPS" and"if'inthestem?Fixed.OKMAB
Concern addressed. OK MAE 02/04/2008
I also have some issues with "B" because subcooling is calculated from
RCS pressure. It makes no sense to monitor the calculated parameter when
the direct parameter is available. Concern addressed. OK MAB
02/04/2008
02/04/2008
S Have licenseewalkme through the technical aspectsofthe question.ImaybeOKwiththe
The only thing that makes "A" and "B" incorrect is that the procedure does
questionwitha couple of minutes of discussion.QisSAT.MAB
not state these parameters, but they would work as a method for
02/04/2008
determining ifthe leak was isolated. Noted.
34 007K3.01 BH2 x BIsthereanextraspacein"D" between"..4," mId"failed"?Fixed.MAB 02/0412008
MAB 02/04/2008
S"C" not plausible becausethereisno relationshipwiththePRT.
The KIA does not restrict this question to be written to test leak isolation.
The following change would correct the distractor
Noted.
plausibility
issue: A.#2sealonRCP#4failed;
Pressurizer
Safety Valve, 1-68-568,failedopen;
ReactorHeadVentValve, I-FCV-68-394, FailedPage8 of29
ES-401,Rev.9
WrittenExamReview
Worksheet Sequoyah 2008-301FormES-401-9
Q#KlA#BLL Psychometric
Flaws Content Flaws U Comment M00StemCues T/F1Non>1Non Partial Min Q-SRO E Explanation
N K D Focus Cred Cred KIA Only SDistDist BIW OpenB.#2sealonRCP#4failed;
PressurizerSafetyValve, 1-68-568,failedopen;
ReactorHeadVentValve (I-FCV-68-394, Failing Open, could not causethestated conditions)
C.Pressurizer
Safety Valve, 1-68-568,failedopen;
Reactor HeadVentValve, I-FCV-68-394, FailedOpen(#2sealonRCP#4failingcouldnot
cause these conditions)
D.Pressurizer
Safety Valve, 1-68-568,failedopen (Pressurizer
Safety Valve, 1-68-568,failingopencouldnot
causethestated plant conditions
AND ReactorHeadVentValve, I-FCV-68-394, FailingOpencouldnot
causethestated plant conditions.)
Discusstheabove change with thelicensee,Ifwecangetthis
change towork,thenthe
questionmaybeSAT.Worked with licensee to develop plausible distractors.OKMAB 02/04/2008
35 007G2.1.1 NF2 x BIsfourth bullet worded correctly?Fixed.MAB 02/04/2008
S"A" and"B"arenot mutually exclusive, which harms their plausibility.
In other words, If"B"weretrue,itwillstill
makessensetodo"A".The
problemisthat if the applicant determinesthatthe alarmisvalid, adjustinglevelwill alwaysbecorrect."A" and"B" corrected.
MAB 02/04/2008Isthereanextra
space in"C" and"D" between"level" and"alarm"?They neglected to correct this;however,theextraspace
appearsinthe'correct answeraswellasa distractor,soitwillnot
adversely affect r'plausibility.
OK MAB 02/04/2008
The question should be specifictothe answer choices provided: Which one of the following correctlystatesthevalidity
ofthePRTlevel alarmandthe requiredactionsasa
result of the alarm?Incorporated.OKMAB 02/04/2008Iwould prefer to have"A" and"B"readasfollows:
A.The PRT level alarmisvalid.(needa
better second half of distractor)B.ThePRTlevel
alarmisvalid.0-SI-OPS-068-137.0, RCS Water Inventory, is requiredtobe performed.
A version ofthis comment was incorporated.
AOP-R.05wasused.OK
MAB 02/04/2008Iwould prefer the second half of"C" and"D"toreadsuchthatit
specifically
states the informationbeingtested.I.E.:C.The PRT level alarmisfalse.According to OPDP-4, the maximum time that Maintenancehasto correct the condition causingtheinvalid
alarmis7days,atwhichtimethe
alarm is requiredtobe cleared/disabled.Page9 of29
ES-401,Rev.9
WrittenExamReview
Worksheet Sequoyah 2008-301FormES-401-9
Q#KlA#BLL Psychometric
Flaws Content Flaws U CommentM00StemCues T/F1Non>1Non Partial Min Q-SRO E Explanation
N K D FocusCredCred KIA Only SDistDist B/WD.The PRTlevelalarmisfalse.
According to OPDP-4, the maximumtimethat Maintenancehasto correct the condition causing the invalid alarmis72hours,at
which time the alarm is requiredtobe cleared/disabled.
Incorporated.OKMAB 02/04/2008
36 008K4.07NF 2 x EIsthereanextra
space between"CCS" and"Pump"inthestem?(I am beginning to thinkthatit justmaybethewayitprintsoutandthattheremaynotbeanextra
space-butitisfreetoask.)
SFixed.MAB 0210412008
Woulditbe possibletotesttheREDlightonthe
throwover switchforthe first part of every answer choice.I thinkthiswouldbea
better test of the actual plant indications.
I.E.EithertheredlightisONorOFF.
Discusswithlicensee.
I think this couldhelpthe plausibility
of"B".Didnot incorporate
after discussions
with licensee.MAB 02/04/2008
37 010K6.03MH2 S Be consistent
with periodsafterbullets.Fixed.MAB 02/04/2008
Simplify the answer choicesasfollows:
A.Master controller
outputwouldincrease.PZR
pressure would be maintainedabovethe reactortripsetpoint.
B.Master controller
output would increase.PZR pressure would decreasetothe reactortripsetpoint.
C.Master controller
output would decrease.PZR pressure would be maintainedabovethe reactortripsetpoint.
*c D.Master controller
output would decrease.PZR pressure would" be maintainedabovethe reactor trip setpoint Incorporated.
MAB 02/0412008
MAB 02/0412008
38 012K4.04NH 2 X?f"A" and"D"arenot plausible becausethelast bulletinthestemleadsthe
17
applicanttoonly consider answer choiceswhereRTA"A" is different than S RTA"B"UVand Shunt coils.Simply using psychometrics, and applicant can eliminatethesetwoanswer
W/E05
choices.Discuss with licensee.Answer choices simplified.
B
Issue resolved.OKMAB 02/04/2008
F
39 013K2.01BH 2 S Potential overlapissueswith
2
006Kl.02 should be discussed.
X?
Ifitis determinedthatthereisno
E
overlap, then questionmaybeSAT.Overlap issue resolved.OKMAB 02/04/2008
How is "A" different from "D"? Are these unique answer choices? It
40 022A2,04NH 2 X?fIsthe wording correctinthe second paragraph,"Comparetheeffectson
EK3.1
ofthe.."?Fixed.OKMAB
should be possible to modify the wording ofthese two distractors to ensure
S
that they are unique, I.E., "A" could be pertaining to high temperatures
and "DO' could speak to cold water on dry tubes as is suggested in the
distractor analysis. Wording in "DO' enhanced to ensure uniqueness of
answer choice. OK MAB 02/04/2008
18
W/Ell
M
H
1
x
Y
Question does not discriminate at the licensed operator level. This is a
EK2.2
h
question that, when provided the reference, almost anyone could arrive at
REF
S
the correct answer.
i
Following suggestion incorporated. OK MAB 02/04/2008
Suggestion to improve question:
Use most of the same items in the stem. Some can be deleted if they
become unnecessary,
Q: Which one ofthe following correctly describes the flow rate that meets
the intent of ECA-l.1, Step 20 RNO?
A.
Establish 325 gpm ECCS flow. ECCS pumps may be started
and stopped as necessary to accomplish the desired flow rate.
B.
Establish 325 gpm ECCS flow. ECCS pumps are not permitted
to be started and stopped as necessary to accomplish the desired
flow rate.
C.
Establish 400 gpm ECCS flow. ECCS pumps may be started
and stopped as necessary to accomplish the desired flow rate.
D.
Establish 400 gpm ECCS flow. ECCS pumps are not permitted
to be started and stopped as necessary to accomplish the desired
flow rate.
This suggestion raises the plausibility ofthe distractors and still tests
Page 5 of29
 
ES-401, Rev. 9
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KlA#
B
L
L
PsychometricFlaws
Content Flaws
U
Comment
M
0
0
Stem
Cues
T/F
1 Non
>1 Non
Partial
Min
Q=
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KIA
Only
S
Dist
Dist
B/W
whether the applicants understand the intent of the procedure step.
Suggestion incorporated. OK MAB 02/04/2008
19
001AK2.05
M
H
1-
B
Be consistent with periods behind bulleted phrases. Fixed. OK MAB
2
02/04/2008
02/04/2008
SHavethe licensee explain the plausibility
S
of additional
Would the question be enhanced if one ofthe Thot or Tcold instruments
cooling units being placedinservice.Arethere
were to fail instead ofthe Tavg auctioneering unit? Discuss with licensee.
additional
Decided not to make a change on temp inst. OK MAB 02/04/2008
coolingunitsthatwouldbe
20
availableatanytimeinorderto
033G2.4.2l
reduce temp?Ifthereare additionalPage10 of29  
M
ES-401,Rev.
F
9 WrittenExamReview
2
Worksheet Sequoyah 2008-301FormES-401-9
S
Q#KiA#BLLPsychometricFlawsContentFlaws
Q is SAT
U Comment M00 Stem Cues T/F1Non>1NonPartialMinSRO E Explanation
21
NKD FocusCredCred KiA Only SDistDist BIW coolingunitsthatcouldbeused,underwhat
036AKl.Ol
conditionswouldthey typicallybeused?Additional
N
coolingunitsare available one oftheunits.Unit
F
differencesmakethe distractors
2
plausible.OKMAB 02/04/2008
S
41 025K5.02MF2 BIsthe incorrectness
Maintain past tense in third bullet. Somewhat incorporated, but it does not
ofthisanswerchoicebasedentirelyontheword"each"?Thisneedstobe
affect technical accuracy of question. OK MAB 02/04/2008
discussedtoensureonlyone
Question is written in the "NOT' format, which is discouraged by
correct answer.S Distractors
NUREG-l02l. This question can remain in its current form as long as the
reworkedtoensureonlyonecorrectanswer.OKMAB
licensee agrees that the question being in this format will not affect
applicant performance. In other words, their applicants have seen
questions in this format and would not get the incorrect answer for any
other reason than a knowledge weakness.
Noted. OK MAB 02/04/2008
22
060AAl.02
M
F
2
X?
x
lei
KIA Match: Have the licensee provide an explanation ofhow the KIA is
matched. The KIA requires testing knowledge ofhow to operate or
S
monitor ventilation systems during an accidental gaseous radwaste release.
:1'
How is a ventilation system being monitored? Rad Mntr is part ofthe
ventilation system. KIA match is OK. MAB 02/04/2008
When would the Waste Gas Rad Monitor not detect a leak from a Waste
Gas Decay Tank? Changed stem to a flange leak which would not cause
the Waste Gas Rad Mntr to alarm. OK MAB 02/0412008
23
069G2.4.45
N
H
2
B
Technical accuracy ofthe question is a concern because they do not have
to restore integrity within 1 hour. Ifthey do not restore integrity within 1
S
hour, then they are required to shutdown. TIle answer choices need to be
more precise in order to be technically correct.
Wording enhancements made to specifically ask for what the Action
Statement states. OK MAB 02/04/2008
24
074EK3.07
B
F
1
x
lei
LOD= 1: Distractors are not plausible. Due to the non-credible distractors,
this question does not discriminate at the appropriate level to make a
S
licensing decision. Changed distractors. OK MAB 02/04/2008
Reflux boiling is a cooling method used when RCPs are off.
How would it be reasonable for an operator to think that starting an RCP
Page 6 of29
 
ES-401, Rev. 9
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KJA#
B
L
L
PsychometricFlaws
Content Flaws
U
Comment
M
0
0
Stem
Cnes
T/F
1 Non
>1 Non
Partial
Min
Q-
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KJA
Only
S
Dist
Dist
B/W
would keep pressure from rising?
Changed distractor. OK MAB 02/04/2008
2S
076AK2.01
B
H
I
x
tf
A pinhole leak of a fuel assembly would be evident in RCS samples that
are analyzed for various isotopes; however, small leaks will not necessarily
S
result in rising radiation monitor trends. There are concerns with "B"
being an altemate correct answer because the size of the leak is not
defined. Also, the RCS leakage locations are not defmed, so there are also
concems about whether a small RCS leak would result in a rising rad
monitor reading.
"Significant increase in RCS activity" added to stem. OK MAB
02/04/2008
02/04/2008
42 026K4.07MF2 BThelicenseeneedsto
LOD= I: Distractors are not plausible. Due to the non-credible distractors,
explainwhythe II%level requirement
this question does not discriminate at the appropriate level to make a
is because of the I-FCV-74-3
licensing decision.
interlock.Iamnotsurethattheattached
Question is on the cusp ofbeing unacceptable due to low LOD. Noted.
reference S material supports this.Maybe the supporting
MAB 02/04/2008
documentationisin anotherprintorlessonplan.Alsoaspart
Consider writing a question that has a plant nip and a SGTL. This will
ofthis discussion,thewording
allow testing MSL monitors as well as Condenser Off Gas Monitors. This
of the questionshouldbe reviewedtoensurethatitisaccurateandwillelicitthe
idea may help to raise the question to a level where it could be used to
answer.Licensee explainedthelevel requirement.OKMAB 02/04/2008
discriminate between a competent and less than competent licensed
43 026G2.4.48
operator.
M H 2 x leiArethereextra
Not incorporated. Allowed by CEo The rest ofthe exam is at an
spacesin"A"and"B"?Fixed.MAB 02/04/2008
acceptable level to not warrant a change to this question. OK MAB
SWillthe terminology"loading room" confuse any of the applicants?
Shouldthisbedefmedwithmore
precise terminology?"loading room"deleted.OKMAB
02/04/2008Isthe wording of"A"and"B" precise enough?Thepumpdidnot(failedto)autostart-thisisafact.Iwouldprefermore
precise terminology
such'1'[as: "Pumpdidnotautostartevenwithanautostartsignal
present." Altemative
similarwordingwouldworkaswell.
Incorporated.OKMAB 02/04/2008Shouldthe answer choices contain commasorperiods betweenthetwoanswerparts.Itlooksliketwo
complete sentences are separated by commas.Two sentencesused.OKMAB
02/04/2008Secondset ofbulletsshouldbe
introducedwithacolon,vice
semi-colon.Fixed.MAB 02/04/2008Timeinthestemisonly
providedtotheminute,yet14:05:00isalmostafull4minutesfrom14:07:59.Theclockinthecontrolroommayreadthesame,butthisis
greaterthan180seconds.Discuss
whether this questionneedstobemore
precisetoelicitthecorrectanswer.
More precisetimesarenotneeded-Imadeanerrorwithmymathwhen
this commentwasmade.OKMAB
02/04/2008"A"and"B"arenot mutually exclusive becauseitmayneverbewrongtoPageII of29
ES-401,Rev.9
WrittenExamReview
Worksheet Sequoyah 2008-301FormES-401-9
Q#KlA#BLLPsychometricFlawsContentFlaws
U Comment M00 Stem Cues T/F 1 Non>1NonPartialMin
Q=SRO E Explanation
N K D FocusCredCred KIA Only SDistDist B/WverifythatthereisroomontheEDGpriorto
manually placingaloadontheEDG.If"A"iscorrect,the"B"willalsobecorrect, Wording revised to ensure uniqueanswerchoices.OKMAB
02/0412008Whendidthe
containment
pressurereach2.81psig?
Discuss whether this is important information
to containinthestem.Qstemis preciseenough.OKMAB
02/0412008"A" and"B" plausibility:
Ifthepumpwas
supposedtoautostart,thenI
know, just using commonsense,thattheEDGis
desigoedtohaveroomtostartthepump (assumingthatthe sequencerhastimedout).
If the sequencerhasnottimedout,thenitwouldnotbesmarttostartthepump
anyway."A" wording revised."B" determinedtobeOKwiththechange
to"A".OKMAB 02/04/2008
44 039Al.09NH 2 x.gKIAMatch:TheKIArequirestesting
knowledge of monitoring
mainsteamline radiation monitor parameters
associated
with operating the SMRSScontrolsto
prevent exceedingdesignlimits.Howdoesthisquestiontestthe knowledge requiredbythe KIA?Howis knowledge of the radiation monitor indicationsbeingtestedin
relationtohowthose
indicationsareusedtoavoid
exceeding design limits?Qreplaced.OKMAB
02/04/2008Thequestionasksforthe
conditionthatis causingthealarm.Istherea
possibility
that another condition,suchasanactualhighrad
conditioncouldcausethealarm?Highradmaynot
causetheother conditions, but ,1coulditcausethealarm?Thewording
ofthequestionmayneedsome
minor revision toensurethatthecorrect
answeriselicited.Qreplaced.OK
MAE 02/0412008Arethesecondparts
oftheanswer choices worded correctly?
The subject of the sentenceappearstobeimplied.
Itwouldbe bettertostatethenoun.Qreplaced.OKMAE
02/04/2008
02/04/2008
No referenceisbeingsuggested.Arethetime
26
requirementsaclosedbook
W/E09
knowledgeitematSQ?Qreplaced.OKMAB
B
02/0412008
H
45 059A2.07NH 2x?B What conditions
2
would automaticallyclosethe2BMFPTCondFCVs?
B
Valve operation depends on powerbeingaboveorbelow60%.OKMAB
The "repressurization" piece of "A" and "B" should be deleted. It does not
S 02/0412008"A" Plausibility:Whatisthelogic
EA2.1
behindtheFCVsbeing
add information that is needed to make these answer choices unique.
re-openedintheAOP?This distractormaynotbe plausible.
S
Itmaynotbe credibleforan operatortothinkthattheywould
Discuss with licensee. Deleted. OK MAE 02/04/2008
re-openvalvesthat
Consider rewording the question as follows:
automatically
Which one ofthe following correctly states the procedure that maximizes
closed.Discussedwithlicensee.OKMAB 02/0412008Page12 of29  
the allowable cooldown rate for the provided circumstances and the
ES-401,Rev.9
maximum cooldown rate allowed by that procedure?
WrittenExamReview
A.
Worksheet Sequoyah 2008-301FormES-401-9
Use ES-0.2, Natural Circulation Cooldown. The cooldown
Q#KiA#BLLPsychometricFlawsContentFlaws
limit is SOF/hr.
U Comment M00 StemCnesT/F1Non>1NonPartialMin
B.
Q=SRO E Explanation
Use ES-0.2, Natural Circulation Cooldown. The cooldown
N K D FocusCredCred KiA Only S Dist Dist B/WThestemandanswerchoicetalksaboutsomeAOPthathasbeenentered.IsthereareasonthattheAOPthattheoperatorsare
limit is 100F/hr.
performingisnot mentionedinthestemortheanswer
C. / Use ES-O.3, Natural Circulation Cooldown with Steam Voids in
choices?Discussthe
Vessel (with RVLSI). The cooldown limit is SOF/hr.
possibility
D.
ofaddingtheAOPtotightenthequestionandtietheanswerstoaspecificAOP.AOP-S.OIaddedtothestem.OKMAB
Use ES-O.3, Natural Circulation Cooldown with Steam Voids in
02/04/200846059A4.01M
Vessel (with RVLSI). The cooldown limit is SOF/hr
H 2SSecondtolastbullet:IassumetheSGlevelisbelowsetpoint,butthisneedstobespecific.Fixed.MAB
Incorporated. OK MAE 02/04/2008
02/04/2008LastBullet:isit
Page 7 of29
necessarytostatethatthedumpsarearmed?No-"armed"deleted.OKMAB
 
ES-401, Rev. 9
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KlA#
B
L
L
Psvchometric Flaws
Content Flaws
U
Comment
M
0
0
Stem
Cues
T/F
1 Non
>1 Non
Partial
Min
Q~
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KIA
Only
S
Dist
Dist
B/W
27
W/EI4
B
F
2
S
Q is SAT.
EA2.2
28
003K3.04
B
H
2
S
Q is SAT.
29
003G2.3.10
N
F
2
S
Q is SAT.
30
004K5.26
N
H
2
S
Q is SAT.
31
004A3.08
B
H
I-
X
B
"D": it is not credible for an applicant to make this error. There is no
2
division needed in this calculation.
S
Consider making "D" 60%. Discuss with licensee
Incorporated. OK MAB 02/04/2008
32
005A4.03
B
H
I-
x
:y
"RCS cooldown rate is too high" - what does this mean? It may not
2
matter, but it would be better to provide the applicant with information that
S
they would normally have available to them, such as an actual temperature
at two different times. It may also be necessary to state that SRO gave
them direction to cooldown at a certain value. The question piece would
need to change slightly to ask for the actions needed to comply with the
SRO's directions. (These changes will make "C" plausible)
Q replaced. OK MAB 02/04/2008
Question should be tied to the procedure. I.E. Which one of the following
..... CONSTANT RHR flow, in accordance with 0-SO-74-1, "procedure
title"?
Q replaced. OK MAB 02/04/2008
"A" and "B" do not contain credible misconceptions to discriminate
between competent and less than competent licensed operators.
Q replaced. OK MAB 02/04/2008
33
006KI.02
M
F
2
B
Is there an extra space between "SSPS" and "if' in the stem?
Fixed. OK MAB 02/04/2008
S
Have licensee walk me through the technical aspects of the question. I
may be OK with the question with a couple of minutes of discussion.
Q is SAT. MAB 02/04/2008
34
007K3.01
B
H
2
x
B
Is there an extra space in "D" between "..4," mId "failed"?
Fixed. MAB 02/0412008
S
"C" not plausible because there is no relationship with the PRT.
The following change would correct the distractor plausibility issue:
A.
#2 seal on RCP #4 failed; Pressurizer Safety Valve, 1-68-568,
failed open; Reactor Head Vent Valve, I-FCV-68-394, Failed
Page 8 of29
 
ES-401, Rev. 9
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KlA#
B
L
L
Psychometric Flaws
Content Flaws
U
Comment
M
0
0
Stem
Cues
T/F
1 Non
>1 Non
Partial
Min
Q-
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KIA
Only
S
Dist
Dist
BIW
Open
B.
#2 seal on RCP #4 failed; Pressurizer Safety Valve, 1-68-568,
failed open; Reactor Head Vent Valve (I-FCV-68-394, Failing
Open, could not cause the stated conditions)
C.
Pressurizer Safety Valve, 1-68-568, failed open; Reactor Head
Vent Valve, I-FCV-68-394, Failed Open (#2 seal on RCP #4
failing could not cause these conditions)
D.
Pressurizer Safety Valve, 1-68-568, failed open (Pressurizer
Safety Valve, 1-68-568, failing open could not cause the stated
plant conditions AND Reactor Head Vent Valve, I-FCV-68-
394, Failing Open could not cause the stated plant conditions.)
Discuss the above change with thelicensee, If we can get this change to
work, then the question may be SAT.
Worked with licensee to develop plausible distractors. OK MAB
02/04/2008
02/04/2008
47 061K5.01 B H 2STyposin5 thbullet.Fixed.MAB
35
02/04/2008Trendsare providedforall parametersexceptforSGlevels.Added.MAE 02/04/2008
007G2.1.1
48 062KI.02BF2 BToomanyitemsarebeingiteratedonintheanswerchoices.Thisprovidestheapplicantswithmultiplewaystoeliminatedistractors.Discusswith
N
Slicensee.Discussed.OKMAB
F
2
x
B
Is fourth bullet worded correctly? Fixed. MAB 02/04/2008
S
"A" and "B" are not mutually exclusive, which harms their plausibility. In
other words, If"B" were true, it will still makes sense to do "A". The
problem is that ifthe applicant determines that the alarm is valid, adjusting
level will always be correct.
"A" and "B" corrected. MAB 02/04/2008
Is there an extra space in "C" and "D" between "level" and "alarm"?
They neglected to correct this; however, the extra space appears in the
~! '
correct answer as well as a distractor, so it will not adversely affect
r'
plausibility. OK MAB 02/04/2008
The question should be specific to the answer choices provided:
Which one ofthe following correctly states the validity ofthe PRT level
alarm and the required actions as a result ofthe alarm?
Incorporated. OK MAB 02/04/2008
I would prefer to have "A" and "B" read as follows:
A. The PRT level alarm is valid. (need a better second halfofdistractor)
B. The PRT level alarm is valid. 0-SI-OPS-068-137.0, RCS Water
Inventory, is required to be performed.
A version ofthis comment was incorporated. AOP-R.05 was used. OK
MAB 02/04/2008
I would prefer the second halfof"C" and "D" to read such that it
specifically states the information being tested. I.E.:
C. The PRT level alarm is false. According to OPDP-4, the maximum time
that Maintenance has to correct the condition causing the invalid alarm is 7
days, at which time the alarm is required to be cleared/disabled.
Page 9 of29
 
ES-401, Rev. 9
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KlA#
B
L
L
Psychometric Flaws
Content Flaws
U
Comment
M
0
0
Stem
Cues
T/F
1 Non
>1 Non
Partial
Min
Q-
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KIA
Only
S
Dist
Dist
B/W
D. The PRT level alarm is false. According to OPDP-4, the maximum
time that Maintenance has to correct the condition causing the invalid
alarm is 72 hours, at which time the alarm is required to be
cleared/disabled.
Incorporated. OK MAB 02/04/2008
36
008K4.07
N
F
2
x
E
Is there an extra space between "CCS" and "Pump" in the stem?
(I am beginning to think that it just may be the way it prints out and that
there may not be an extra space - but it is free to ask.)
S
Fixed. MAB 0210412008
Would it be possible to test the RED light on the throwover switch for the
first part of every answer choice. I think this would be a better test ofthe
actual plant indications. I.E. Either the red light is ON or OFF. Discuss
with licensee.
I think this could help the plausibility of "B".
Did not incorporate after discussions with licensee. MAB 02/04/2008
37
010K6.03
M
H
2
S
Be consistent with periods after bullets. Fixed. MAB 02/04/2008
Simplify the answer choices as follows:
A.
Master controller output would increase. PZR pressure would
be maintained above the reactor trip setpoint.
B.
Master controller output would increase. PZR pressure would
decrease to the reactor trip setpoint.
C.
Master controller output would decrease. PZR pressure would
be maintained above the reactor trip setpoint.
*c
D.
Master controller output would decrease. PZR pressure would
"
be maintained above the reactor trip setpoint
Incorporated. MAB 02/0412008
38
012K4.04
N
H
2
X?
f
"A" and "D" are not plausible because the last bullet in the stem leads the
applicant to only consider answer choices where RTA "A" is different than
S
RTA "B" UV and Shunt coils. Simply using psychometrics, and applicant
can eliminate these two answer choices. Discuss with licensee.
Answer choices simplified. Issue resolved. OK MAB 02/04/2008
39
013K2.01
B
H
2
S
Potential overlap issues with 006Kl.02 should be discussed. Ifit is
determined that there is no overlap, then question may be SAT.
Overlap issue resolved. OK MAB 02/04/2008
40
022A2,04
N
H
2
X?
f
Is the wording correct in the second paragraph, "Compare the effects on of
the .."? Fixed. OK MAB 02/04/2008
S
Have the licensee explain the plausibility of additional cooling units being
placed in service. Are there additional cooling units that would be
available at any time in order to reduce temp? If there are additional
Page 10 of29
 
ES-401, Rev. 9
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KiA#
B
L
L
PsychometricFlaws
Content Flaws
U
Comment
M
0
0
Stem
Cues
T/F
1 Non
>1 Non
Partial
Min
Q~
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KiA
Only
S
Dist
Dist
BIW
cooling units that could be used, under what conditions would they
typically be used?
Additional cooling units are available one ofthe units. Unit differences
make the distractors plausible. OK MAB 02/04/2008
41
025K5.02
M
F
2
B
Is the incorrectness ofthis answer choice based entirely on the word
"each"? This needs to be discussed to ensure only one correct answer.
S
Distractors reworked to ensure only one correct answer. OK MAB
02/04/2008
02/04/2008
Considerthefollowing:
42
A.After1.25seconds,allEDGswillautostart.B.After1.25seconds,onlytheIB-BEDGwillstart.
026K4.07
C.After300secondsallEDGswillautostart.
M
c D.After300secondsonlytheIB-BEDGwill
F
statioIncorporated.OKMAB
2
02/04/2008
B
49063K2.01N H 2?+Distractoranalysisstatesthatanapplicantmaythinkthatcontrolpowerfor
The licensee needs to explain why the II% level requirement is because of
the breakerissuppliedfromtheEDGbattery.Whywouldan
the I-FCV-74-3 interlock. I am not sure that the attached reference
applicant Sthinkthis.DotheEDGbatteriessupplycontrolpowertootherbusesortothisbusunderdifferentplantconditions?Ineedto
S
understandthecredible
material supports this. Maybe the supporting documentation is in another
misconceptionalittlebetter.Answerchoicesrevisedtocorrectissue.OKMAE
print or lesson plan. Also as part ofthis discussion, the wording ofthe
02/04/2008
question should be reviewed to ensure that it is accurate and will elicit the
50064K6.08BF
answer.
2 x x.y"B"isnotplausible:TIleentirereasonforhavingastandbypumpistohaveitbackuptheleadpump.Thesecondpumpisnotreferredtointhe
Licensee explained the level requirement. OK MAB 02/04/2008
S distractorasthestandbypump,butitisstronglyimpliedbythestemstatingthatthereisaleadpump.Amanual
43
alignmentdoesnotappeartomakesense.
026G2.4.48
Distractorsrevised.OKMAB
M
02/04/2008"C"isnot plausiblebecausethestemprovidesacuethatthesepumpsstartontanklevel."C"allowedthis
H
distractortostayonexamafter
2
discussions
x
withlicensee.OKMAB
lei
02/04/2008Page13 of29  
Are there extra spaces in "A" and "B"? Fixed. MAB 02/04/2008
ES-401,Rev.9
S
WrittenExamReview
Will the terminology "loading room" confuse any ofthe applicants?
Worksheet Sequoyah 2008-301FormES-401-9
Should this be defmed with more precise terminology?
Q#KlA#BLLPsychometricFlawsContentFlaws
"loading room" deleted. OK MAB 02/04/2008
U Comment M00StemCnes T/F1Non>1NonPartialMin
Is the wording of "A" and "B" precise enough? The pump did not (failed
Q=SRO E Explanation
to) auto start - this is a fact. I would prefer more precise terminology such
N K 0 FocusCredCred KIA Only SDistDist BIW"A"isthe obvious answer becausethestemstatesthatthese
'1'[
pumpsstarton low tank level.Itwouldalsobe
as: "Pump did not auto start even with an auto start signal present."
commonsenseto assumethatthe standby pumpwouldnot stiltatthesametimeorlevelasthelead
Altemative similar wording would work as well.
pump,whichiswhyitisa standbypump.After
Incorporated. OK MAB 02/04/2008
discussionwithlicensee, decidedtoallow this distractor.OKMAB 02/04/2008
Should the answer choices contain commas or periods between the two
If possible, place the conditions
answer parts. It looks like two complete sentences are separated by
of the plantinthestem, rather than making the answer choices conditional.
commas.
A specifictankleveland
Two sentences used. OK MAB 02/04/2008
switch positionforthe backup pump should be placedinthestem.
Second set ofbullets should be introduced with a colon, vice semi-colon.
Itisnot prohibited
Fixed. MAB 02/04/2008
to place conditions
Time in the stem is only provided to the minute, yet 14:05:00 is almost a
in answer choices, therefore Q was not changed.OKMAB 02/04/2008
full 4 minutes from 14:07:59. The clock in the control room may read the
same, but this is greater than 180 seconds. Discuss whether this question
needs to be more precise to elicit the correct answer.
More precise times are not needed - I made an error with my math when
this comment was made. OK MAB 02/04/2008
"A" and "B" are not mutually exclusive because it may never be wrong to
Page II of29
 
ES-401, Rev. 9
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KlA#
B
L
L
PsychometricFlaws
Content Flaws
U
Comment
M
0
0
Stem
Cues
T/F
1 Non
>1 Non
Partial
Min
Q=
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KIA
Only
S
Dist
Dist
B/W
verify that there is room on the EDG prior to manually placing a load on
the EDG. If "A" is correct, the "B" will also be correct,
Wording revised to ensure unique answer choices. OK MAB 02/0412008
When did the containment pressure reach 2.81 psig? Discuss whether this
is important information to contain in the stem.
Q stem is precise enough. OK MAB 02/0412008
"A" and "B" plausibility: Ifthe pump was supposed to auto start, then I
know, just using common sense, that the EDG is desigoed to have room to
start the pump (assuming that the sequencer has timed out). Ifthe
sequencer has not timed out, then it would not be smart to start the pump
anyway. "A" wording revised.
"B" determined to be OK with the change
to "A". OK MAB 02/04/2008
44
039Al.09
N
H
2
x
.g
KIA Match: The KIA requires testing knowledge ofmonitoring main
steam line radiation monitor parameters associated with operating the
S
MRSS controls to prevent exceeding design limits. How does this question
test the knowledge required by the KIA? How is knowledge ofthe
radiation monitor indications being tested in relation to how those
indications are used to avoid exceeding design limits?
Q replaced. OK MAB 02/04/2008
The question asks for the condition that is causing the alarm. Is there a
possibility that another condition, such as an actual high rad condition
could cause the alarm? High rad may not cause the other conditions, but
,1
could it cause the alarm? The wording ofthe question may need some
minor revision to ensure that the correct answer is elicited.
Q replaced. OK MAE 02/0412008
Are the second parts ofthe answer choices worded correctly? The subject
ofthe sentence appears to be implied. It would be better to state the noun.
Q replaced. OK MAE 02/04/2008
No reference is being suggested. Are the time requirements a closed book
knowledge item at SQ?
Q replaced. OK MAB 02/0412008
45
059A2.07
N
H
2
x
?
B
What conditions would automatically close the 2B MFPT Cond FCVs?
Valve operation depends on power being above or below 60%. OK MAB
S
02/0412008
"A" Plausibility: What is the logic behind the FCVs being re-opened in the
AOP? This distractor may not be plausible. It may not be credible for an
operator to think that they would re-open valves that automatically closed.
Discussed with licensee.
OK MAB 02/0412008
Page 12 of29
 
ES-401, Rev. 9
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KiA#
B
L
L
PsychometricFlaws
Content Flaws
U
Comment
M
0
0
Stem
Cnes
T/F
1 Non
>1 Non
Partial
Min
Q=
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KiA
Only
S
Dist
Dist
B/W
The stem and answer choice talks about some AOP that has been entered.
Is there a reason that the AOP that the operators are performing is not
mentioned in the stem or the answer choices? Discuss the possibility of
adding the AOP to tighten the question and tie the answers to a specific
AOP. AOP-S.OI added to the stem. OK MAB 02/04/2008
46
059A4.01
M
H
2
S
Second to last bullet: I assume the SG level is below setpoint, but this
needs to be specific. Fixed. MAB 02/04/2008
Last Bullet: is it necessary to state that the dumps are armed?
No - "armed" deleted. OK MAB 02/04/2008
47
061K5.01
B
H
2
S
Typos in 5th bullet. Fixed. MAB 02/04/2008
Trends are provided for all parameters except for SG levels.
Added. MAE 02/04/2008
48
062KI.02
B
F
2
B
Too many items are being iterated on in the answer choices. This provides
the applicants with multiple ways to eliminate distractors. Discuss with
S
licensee. Discussed. OK MAB 02/04/2008
Consider the following:
A.
After 1.25 seconds, all EDGs will auto start .
B.
After 1.25 seconds, only the IB-B EDG will start.
C.
After 300 seconds all EDGs will autostart.
c
D.
After 300 seconds only the IB-B EDG will statio
Incorporated. OK MAB 02/04/2008
49
063K2.01
N
H
2
?
+
Distractor analysis states that an applicant may think that control power for
the breaker is supplied from the EDG battery. Why would an applicant
S
think this. Do the EDG batteries supply control power to other buses or to
this bus under different plant conditions? I need to understand the credible
misconception a little better.
Answer choices revised to correct issue. OK MAE 02/04/2008
50
064K6.08
B
F
2
x
x
.y
"B" is not plausible: TIle entire reason for having a standby pump is to
have it backup the lead pump. The second pump is not referred to in the
S
distractor as the standby pump, but it is strongly implied by the stem
stating that there is a lead pump. A manual alignment does not appear to
make sense.
Distractors revised. OK MAB 02/04/2008
"C" is not plausible because the stem provides a cue that these pumps start
on tank level. "C" allowed this distractor to stay on exam after discussions
with licensee. OK MAB 02/04/2008
Page 13 of29
 
ES-401, Rev. 9
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KlA#
B
L
L
Psychometric Flaws
Content Flaws
U
Comment
M
0
0
Stem
Cnes
T/F
1 Non
>1 Non
Partial
Min
Q=
SRO
E
Explanation
N
K
0
Focus
Cred
Cred
KIA
Only
S
Dist
Dist
BIW
"A" is the obvious answer because the stem states that these pumps start on
low tank level. It would also be common sense to assume that the standby
pump would not stilt at the same time or level as the lead pump, which is
why it is a standby pump. After discussion with licensee, decided to allow
this distractor. OK MAB 02/04/2008
If possible, place the conditions of the plant in the stem, rather than making
the answer choices conditional. A specific tank level and switch position
for the backup pump should be placed in the stem.
It is not prohibited to place conditions in answer choices, therefore Q was
not changed. OK MAB 02/04/2008
Consider the following:
Consider the following:
Initial plant conditions:
Initial plant conditions:
-2A-A EDG running-Fueloilday
-
tank level=##%-Leadfueloil
2A-A EDG running
transferpumpis running-The backupfueloil transfer pump control switchisinAUTO Current plant conditions:
-
-Leadfueloil
Fuel oil day tank level = ##%
transferpumpshaft completely
-
shears Whichoneofthe following correctly describes the operationofthe backupfueloil transfer pump?A.The backuppumpwillbe
Lead fuel oil transfer pump is running
runningduetoastartsignalonlow
-
discharge pressure.B.The backuppumpwillbe
The backup fuel oil transfer pump control switch is in AUTO
runningduetoastart
Current plant conditions:
signalonlow tanklevel.
-
C.The backuppumpwillnotbe
Lead fuel oil transfer pump shaft completely shears
runningandwillnotstartat
Which one of the following correctly describes the operation of the backup
anytimeastanklevellowers.
fuel oil transfer pump?
D.The backuppumpwillnotbe
A.
running,butwillstartas
The backup pump will be running due to a start signal on low
tank level lowerswithno discharge pressureontheleadpump.
discharge pressure.
Allowed Q to remainwithonly minor revision.OKMAB 02/0412008
B.
51 073AI.01 N II 2 x:g Is second bullet worded correctly?
The backup pump will be running due to a start signal on low
Fixed.MAB 02/04/2008
tanklevel.
F S Be consistent
C.
with periods behind bullets.Licenseedidnot incorporate
The backup pump will not be running and will not start at
this comment,butdoesnot
anytime as tank level lowers.
affect the technical accuracyofthequestion, OK MAE 02/0412008
D.
This question is reallywrittenatthe (Fnmdamental
The backup pump will not be running, but will start as tank
knowledge level.It appearsliketheremaybe
level lowers with no discharge pressure on the lead pump.
infonnationinthestemthatdoesnotaddvaluetothe question.The question reallydoesnotask
Allowed Qto remain with only minor revision. OK MAB 02/0412008
anythingmorethan: What automatic actions occurasaresult of2-RM-90-123A
51
alarming on high radiation?
073AI.01
Licenseedidnot incorporate
N
comment,TIleyareinthe
II
middle ofthebandfor
2
CIAandF questions, therefore designating
x
this questionineither categorywillnot cause allexammetrictobe
:g
encroachedPage14 of29  
Is second bullet worded correctly? Fixed. MAB 02/04/2008
ES-401,Rev.
F
9 Written Exam Review Worksheet Sequoyah 2008-301FormES-401-9
S
Q#KlA#nLL Psychometric
Be consistent with periods behind bullets. Licensee did not incorporate
Flaws Content Flaws U CommentM00StemCues T/F1Non>1Non Partial Min Q-SRO E Explanation
this comment, but does not affect the technical accuracy of the question,
N K D FocusCredCred KIA Only SDistDist BIWupon.Iwouldhaverequiredthistobefixedifitaffectedtheadherencetothehighercogcriteria.
OK MAE 02/0412008
OK MAE 02/04/2008"B"isnotplausible:Whatinformationinthestemwouldlendcredibilitytothisdistractor.
This question is really written at the (Fnmdamental knowledge level.
Itisverybasicthatthereisanautoisolation
It
ofthe surge tank.Itisnotenoughtosimplytestwhetheranautoisolationexists.Iagreewiththeplausibilitythatyouhavebuiltintotheothertwodistrators.Isthereanywaytoimprovethisdistractorbyrequiringtheapplicantstoknowalittlemorethanwhetherornotanautoisolationexists?"B"replaced.MAB
appears like there may be infonnation in the stem that does not add value
02/04/2008Does"C"containgrammaticalerrorsinbothsentences?Fixed.MAB 02/04/2008"D":whenpossible,alwayswordquestionsandanswersforwhatisrequiredtobedone,notwhatanoperatorwillormaydo.Thisisbecauseoperatorsmaydoanything,butwewanttotestwhattheyarerequiredto
to the question. The question really does not ask anything more than:
do.Revised.OK MAE 02/04/200852076A2.02NH 2:yTypoinsecondbullet.Fixed.MAE
What automatic actions occur as a result of2-RM-90-123A alarming on
02/0412008
high radiation? Licensee did not incorporate comment, TIley are in the
SIsthereenough
middle ofthe band for CIA and F questions, therefore designating this
informationinthestemtoelicitthecorrectanswer?DuringthereviewinAtlantawewillneedtopullprintsanddoadetailedreviewoftheinformationinthestem, detennineifthestempermitsapplicants,orforcesapplicantstomakeassumptionsonthelocationofthe.j(leak,onhowandwheretheleakisisolated,andwhethertherearecredible
question in either category will not cause all exam metric to be encroached
"argumentsfornocorrectanswersormnltiplecorrectanswers.Plausibility
Page 14 of29
ofthedistractorswillalsoneedtobediscussed.
 
OK.WepulledprintsduringIPandquestionissat.MAB
ES-401, Rev. 9
02/04/2008Thisquestionwillberatedasunsat,pendingthedetailedreviewthatwilltakeplacewiththelicensee.
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KlA#
n
L
L
Psychometric Flaws
Content Flaws
U
Comment
M
0
0
Stem
Cues
T/F
1 Non
>1 Non
Partial
Min
Q-
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KIA
Only
S
Dist
Dist
BIW
upon. I would have required this to be fixed if it affected the adherence to
the higher cog criteria. OK MAE 02/04/2008
"B" is not plausible: What information in the stem would lend credibility
to this distractor. It is very basic that there is an auto isolation ofthe surge
tank. It is not enough to simply test whether an auto isolation exists. I
agree with the plausibility that you have built into the other two distrators.
Is there any way to improve this distractor by requiring the applicants to
know a little more than whether or not an auto isolation exists?
"B" replaced. MAB 02/04/2008
Does "C" contain grammatical errors in both sentences?
Fixed. MAB 02/04/2008
"D": when possible, always word questions and answers for what is
required to be done, not what an operator will or may do. This is because
operators may do anything, but we want to test what they are required to
do.
Revised. OK MAE 02/04/2008
52
076A2.02
N
H
2
:y
Typo in second bullet. Fixed. MAE 02/0412008
S
Is there enough information in the stem to elicit the correct answer?
During the review in Atlanta we will need to pull prints and do a detailed
review of the information in the stem, detennine if the stem permits
applicants, or forces applicants to make assumptions on the location of the
.j(
leak, on how and where the leak is isolated, and whether there are credible
"
arguments for no correct answers or mnltiple correct answers. Plausibility
ofthe distractors will also need to be discussed.
OK. We pulled prints during IP and question is sat. MAB 02/04/2008
This question will be rated as unsat, pending the detailed review that will
take place with the licensee.
Q OK MAB 02/04/2008
Q OK MAB 02/04/2008
53076A4.02MF2
53
EIsthereanextraspacebetween"following" and"the"?Qsimplified.Corrected.MAE
076A4.02
M
F
2
E
Is there an extra space between "following" and "the"?
Q simplified. Corrected. MAE 02/04/2008
S
"A": Would it be more plausible for I-FCY-67-146 to be "Auto" and 2-
FCY-67-146 to be "Manual"? This qnestion is being asked because on the
surface it may make sense for the valve on the unit with the SI to auto
reposition, rather than the other unit's valve? This may be due to my
unfamiliarity with SQ. Discuss with licensee.
Corrected. MAB 02/04/2008
Is there any possibility that EA-67-1 allows operators to reposition O-FCY-
Page 15 of29
 
ES-401, Rev. 9
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KiA#
B
L
L
Psychometric Flaws
Content Flaws
U
Comment
M
0
0
Stem
Cues
T/F
1 Non
>1 Non
Partial
Min
Q=
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KiA
Only
S
Dist
Dist
B/W
67-152, thus bringing into question the possibility that Manual would be
the correct response for all three valves?
Q revised. Corrected. MAB
02/04/2008
02/04/2008
S"A":Woulditbemoreplausiblefor
The stem contains a lot of words. Are we simply asking the following:
I-FCY-67-146tobe"Auto"and
Which one ofthe following correctly describes the following valve
2-FCY-67-146tobe"Manual"?ThisqnestionisbeingaskedbecauseonthesurfaceitmaymakesenseforthevalveontheunitwiththeSItoautoreposition,ratherthantheother
responses to a Unit I safety injection?
unit'svalve?ThismaybeduetomyunfamiliaritywithSQ.Discusswithlicensee.Corrected.MAB
02/04/2008IsthereanypossibilitythatEA-67-1allowsoperatorstorepositionO-FCY-Page15 of29
ES-401,Rev.
9 WrittenExamReview
Worksheet Sequoyah 2008-301FormES-401-9
Q#KiA#BLL Psychometric
Flaws Content Flaws U Comment M 0 0StemCues T/F1Non>1Non PartialMinQ=SRO E Explanation
N K D Focus Cred Cred KiA Only SDistDist B/W67-152,thus
bringingintoquestionthe
possibilitythatManualwouldbe
the correct responseforallthreevalves?Qrevised.
Corrected.
MAB 02/04/2008Thestem containsalot ofwords.Arewe
simplyaskingthefollowing:Whichone of the following correctly describesthefollowingvalve
responsestoaUnitIsafety
injection?
0-FCV-67-152
0-FCV-67-152
I-FCV-67-146
I-FCV-67-146
2-FCV-67-146
2-FCV-67-146
A.Auto repositions
A. Auto repositions
Auto repositionsDoesNOTauto
Auto repositions
repositionB.etc.Incorporated,OKMAB 02/04/200854078K3.01MF
Does NOT auto reposition
I-S Questionisrightatthecusp
B. etc.
ofbeingacceptable.Whenallotherchanges
Incorporated, OK MAB 02/04/2008
2totheexam havebeenmade,anoverall
54
evaluation
078K3.01
oftheexamwillbe
M
performed.QisOK.MAB 02/04/2008
F
55103A3.01M H I-X:g"C" and"D" plausibility:Thereareno
I-
indicationsinthestemthatwould
S
2leadan applicanttobelievethatCVI
Question is right at the cusp ofbeing acceptable. When all other changes
shouldonlyhave occurredonone Strain.Arerad
2
monitorstrainspecificforCVI?Ifso,addvaluesforboth
to the exam have been made, an overall evaluation ofthe exam will be
the"A" and"B"monitors,withthe"B"atalowervalue.
performed. Q is OK. MAB 02/04/2008
Specific rad monitor informationadded.OKMAB
55
103A3.01
M
H
I-
X
:g
"C" and "D" plausibility: There are no indications in the stem that would
2
lead an applicant to believe that CVI should only have occurred on one
S
train. Are rad monitors train specific for CVI? If so, add values for both
the "A" and "B" monitors, with the "B" at a lower value.
Specific rad monitor information added. OK MAB 02/04/2008
56
011K6.05
N
H
2
?
:g
Be consistent with periods after bullets. Fixed. 02/04/2008
S
'f
What credible misconception would lead an applicant to believe that I-LT-
68-321 would have an impact on pzr level control when I-LT-68-320 is
I
S
selected?"
Licensee revised answer choices to correct. OK MAB 02/04/2008
AJ:e the cold cal instruments ever used for pzr level control?
Cold Cal instruments deleted from answer choices. OK MAB 02/04/2008
57
015K2.01
M
F
I-
x
Y
"B" and "C" are not plausible: These two choices can be eliminated just
2
by knowing that even channels are powered by the same bus and the odd
S
channels are powered from the same bus (or at least the same division of
power). The mixing of even and odd NI numbers make these two
distractors not plausible.
Distractors revised to correct concem. OK MAB 02/04/2008
58
016K1.10
M
F
2
S
Q is SAT.
59
o17K4.03
B
F
I
x
Y
Remaining "in" limits, or "within" limits? Either way - it just depends on
how you want your applicants to read the question. Fixed. MAB
S
02/04/2008
02/04/2008
56 011K6.05 N H 2?:g Be consistentwithperiodsafterbullets.Fixed.
What does "limits" mean in the stem? Is this specific enough to elicit the
Page 16 of29
 
ES-401, Rev. 9
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KJA#
B
L
L
Psychometric Flaws
Content Flaws
U
Comment
M
0
0
Stem
Cues
T/F
1 Non
>1 Non
Partial
Min
Q=
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KJA
Only
S
Dist
Dist
BIW
correct answer? I understand what it means only by reading the question
analysis, which the applicants will not have. Wording enhancements
made. OK MAE 02/04/2008
The question should also be tied to the procedure. Incorporated. MAB
02/04/2008
02/04/2008
S'f What credible misconceptionwouldleadan
"C" and "D" are not plausible. The magnitude of these two answer choices
applicanttobelievethat
make them completely non-credible.
I-LT-68-321wouldhaveanimpactonpzrlevel
Distractors revised. OK MAB 02/04/2008
control when I-LT-68-320
Are there any other choices that have meaning at your plant? 600F?
is I S selected?" Licensee revised answer choicestocorrect.OKMAB
700F? nOF? 750F? Different values were agreed upon with licensee.
02/04/2008
OK MAE 02/04/2008
AJ:ethecoldcal
60
instrumentseverusedforpzrlevel
045K5.17
control?ColdCal instrumentsdeletedfromanswerchoices.OKMAB
N
02/04/200857015K2.01M
H
F I-x Y"B" and"C"arenot plausible:Thesetwo choicescanbe eliminated
I-
just 2 by knowingthateven channels are poweredbythesamebusandtheodd
x
Schannelsare
Y
poweredfromthesamebus(oratleastthesame
"A" is not plausible. This is not a method which is directed by plant
division ofpower).The
2
mixingofevenandoddNI
procedures, which does not create a plausible distractor.
numbersmakethesetwo
S
distractorsnotplausible.
Qand distractor revised to address concem. OK MAE 02/04/2008
Distractorsrevisedto correct concem.OKMAB 02/04/2008
"D" is not plausible. Two variables, the two parameters being analyzed,
58 016K1.10 M F 2 SQisSAT.59 o 17K4.03 B F I x Y Remaining"in"limits,or"within"limits?Eitherway-it
moving is not plausible. Q and distractor revised to address concem. OK
justdependsonhowyouwantyour
MAB 02/04/2008
applicantstoreadthequestion.Fixed.MAB S 02/04/2008Whatdoes"limits"meaninthestem?IsthisspecificenoughtoelicitthePage16 of29
This question is pure GFE. Applicants have already passed a GFE. This is
ES-401,Rev.9
the Site Specific written exam. Steam header pressure incorporated, which
WrittenExamReview
makes the question more plant specific. OK MAB 02/04/2008
Worksheet Sequoyah 2008-301FormES-401-9
;.
Q#KJA#BL L Psychometric
Will the correct answer be correct under all plant conditions that can be
FlawsContentFlaws
assumed with the information provided in the stem? To be safe, does a
U Comment M00StemCues T/F 1 Non>1NonPartial
bumup need to be provided in the stem as well? Answer will always be
Min Q=SRO E Explanation
correct at 50% power. OK MAB 02/04/2008
N K D FocusCredCred KJA Only SDistDist BIWcorrectanswer?Iunderstandwhatitmeansonlybyreadingthequestionanalysis,whichtheapplicantswillnothave.Wordingenhancementsmade.OKMAE
This question can be brought to an acceptable level by making it plant
02/04/2008Thequestionshouldalsobetiedtotheprocedure.Incorporated.MAB
specific. Maybe iterating on "B" and "C" and then adding a second half to
02/04/2008"C"and"D"arenotplausible.Themagnitudeofthesetwoanswerchoicesmakethemcompletelynon-credible.Distractorsrevised.OKMAB
the distractors would accomplish plausibility and allow for a plant specific
02/04/2008Arethereanyotherchoicesthathavemeaningatyourplant?600F?
question. Qrevised. OK MAB 02/04/2008
700F?nOF?750F?Differentvalueswereagreeduponwithlicensee.OKMAE 02/04/200860045K5.17NH I-x Y"A"isnotplausible.Thisisnotamethodwhichisdirectedbyplant
61
2procedures,whichdoesnotcreateaplausibledistractor.
055A3.03
S Qanddistractorrevisedtoaddressconcem.OKMAE
N
02/04/2008"D"isnotplausible.Twovariables,thetwoparametersbeinganalyzed,movingisnotplausible.
H
Qanddistractorrevisedtoaddressconcem.OK
2
MAB 02/04/2008ThisquestionispureGFE.ApplicantshavealreadypassedaGFE.ThisistheSiteSpecificwrittenexam.Steamheaderpressureincorporated,whichmakesthequestionmoreplantspecific.OKMAB
x
02/04/2008
g
;.Willthecorrectanswerbecorrectunderallplantconditionsthatcanbeassumedwiththeinformationprovidedinthestem?Tobesafe,doesabumupneedtobeprovidedinthestemaswell?Answerwillalwaysbecorrectat50%power.OKMAB
"C": lacks a period. Fixed. MAB 02/04/2008
02/04/2008Thisquestioncanbebroughttoanacceptablelevelbymakingitplantspecific.Maybeiteratingon"B"and"C"andthenaddingasecond
S
half tothedistractorswouldaccomplish
"B" is not plausible. The reason in "B" is not tied to conditions that are
plausibilityandallowforaplantspecific
provided in the stem. Compare to "A" - where "A" contains a reason that
question.Qrevised.OKMAB
corresponds to an alarm that is provided in the stem. To raise the
02/04/2008
plausibility of"B", the reason needs to be tied to a condition in the stem.
61 055A3.03NH 2 x g"C":lacksaperiod.Fixed.MAB
Simplified to only tie to high pressure, vice rad inst malfunction. OK
02/04/2008
MAE 02/04/2008
S"B"isnotplausible.Thereasonin"B"isnottiedtoconditionsthatareprovidedinthestem.Compareto"A"-where"A"containsareasonthatcorrespondstoanalarmthatisprovidedinthestem.Toraisethe
Page 17 of29
plausibility
 
of"B",thereasonneedstobetiedtoaconditioninthestem.Simplifiedtoonlytietohighpressure,viceradinstmalfunction.OK
ES-401, Rev. 9
MAE 02/04/2008Page17 of29  
Written Exam Review Worksheet
ES-401,Rev.9
Sequoyah 2008-301
WrittenExamReview
Form ES-401-9
Worksheet Sequoyah 2008-301FormES-401-9
Q#
Q#KlA#BLLPsvchometricFlawsContentFlaws
KlA#
U Comment M00StemCuesT/F
B
1 Non>1NonPartial
L
MinSRO E Explanation
L
N K D FocusCredCred KIAOnlySDistDist B/W 62 068A4.02MF2SQisSAT.TIlechosenwordingdoesnotappeartobetheeasiestto
PsvchometricFlaws
interpret,buttheQisOK
Content Flaws
ifyouwanttogowiththe
U
current wording.Ifyouwouldlikeyour
Comment
applicantstoseethis questionwordedslightly
M
different,IamOKwiththattoo.OKMAB 02/0412008
0
63 071K3.04 M H 2SQisSAT.64075G2.2.1I
0
N H 2:g Grammarissueinfirstbullet.Qreplaced.OKMAB
Stem
02/04/2008
Cues
SThestem ofthequestionisvaguewith
T/F
respecttohowthedesignwillbe
1 Non
changed.Itisimplied,thatthechangewill
>1 Non
causethevalveto
Partial
automaticallyclose.Isit
Min
importanttostatethis.Willitbe
Q~
possibleforan applicant to assumeachangethatwouldaffecttheanswer
SRO
choices?Qreplaced.OKMAB
E
02/04/2008Doyouwanttoaskthis
Explanation
question to allRO?Doyouhave
N
ally RO learning objectives
K
associatedwithtemp changes?Isthis knowledge part oftheRO ILT program?Discusswithlicensee.Qreplaced.OKMAB
D
02/04/2008
Focus
If licensee can produce documentationthatthisisOKtoaskanRO,then
Cred
the questionisSAT.Qreplaced.OKMAB
Cred
02/04/2008
KIA
65 086AI.OI N F'5.x Y Answerchoicesneedsome"the'tsadded
Only
between"trip" and"pump".Qrevised.OKMAB
S
02/04/2008
Dist
S KIAnotmatched:The
Dist
KIA requirestestingthe
B/W
ability to monitorlpredict
62
changes in parametersastheyrelateto
068A4.02
operatingcontrolsto
M
prevent exceedingdesignlimits(fireheaderpressure).Thisquestiononlytests
F
knowledge of existence ofdesignfeatures.Thequestiondoesnottesttheabilityto monitorchangesin parameters
2
to prevent from exceeding design limits.Qrevised.OKMAE
S
02/04/2008
Q is SAT. TIle chosen wording does not appear to be the easiest to
66 G2.I.3NF 2 S Questioniswrittenasa
interpret, but the Q is OK ifyou want to go with the current wording. If
''NOT''question,whichis
you would like your applicants to see this question worded slightly
discouragedbytheNUREG.Iwillallowthisformat
different, I am OK with that too.
ifthelicenseedoesnothaveanissue
OK MAB 02/0412008
with presenting
63
the questiontotheapplicants
071K3.04
inthisformat.Noted.MAB 02/04/2008
M
Repeatedtheword"during"inthestem.Fixed.MAE
H
2
S
Q is SAT.
64
075G2.2.1 I
N
H
2
:g
Grammar issue in first bullet.
Q replaced. OK MAB 02/04/2008
S
The stem ofthe question is vague with respect to how the design will be
changed. It is implied, that the change will cause the valve to
automatically close. Is it important to state this. Will it be possible for an
applicant to assume a change that would affect the answer choices?
Q replaced. OK MAB 02/04/2008
Do you want to ask this question to all RO? Do you have ally RO learning
objectives associated with temp changes? Is this knowledge part of the RO
ILT program? Discuss with licensee.
Q replaced. OK MAB 02/04/2008
If licensee can produce documentation that this is OK to ask an RO, then
the question is SAT.
Q replaced. OK MAB 02/04/2008
65
086AI.OI
N
F
'5.
x
Y
Answer choices need some "the'ts added between "trip" and "pump".
Qrevised. OK MAB 02/04/2008
S
KIA not matched: The KIA requires testing the ability to monitorlpredict
changes in parameters as they relate to operating controls to prevent
exceeding design limits (fire header pressure). This question only tests
knowledge of existence of design features. The question does not test the
ability to monitor changes in parameters to prevent from exceeding design
limits.
Q revised. OK MAE 02/04/2008
66
G2.I.3
N
F
2
S
Question is written as a ''NOT'' question, which is discouraged by the
NUREG. I will allow this format ifthe licensee does not have an issue
with presenting the question to the applicants in this format.
Noted. MAB 02/04/2008
Repeated the word "during" in the stem. Fixed. MAE 02/0412008
67
G2.I.27
B
H
2
S
Third bullet: "start" should be plural. Fixed. MAB 02/04/2008
Page 18 of29
 
ES-401, Rev. 9
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KiA#
B
L
L
Psychometric Flaws
Content Flaws
U
Comment
M
0
0
Stem
Cues
T/F
1 Non
>1 Non
Partial
Min
Q-
SRO
E
Explanation
N
K
D
Focns
Cred
Cred
KiA
Only
S
Dist
Dist
B/W
Fourth bullet: "level" should be plural. Fixed. MAB 02/04/2008
Be consistent with tense in all answer choices. Consider:
A.
Arming conditions for AMSAC were not present.
B.
AMSAC actuated.
C.
Arming conditions were present, but actuation conditions were
not present.
D.
AMSAC has not actuated, but will actuate after the appropriate
time delay if SG levels stabilize at their current values.
Fixed. MAB 02/04/2008
68
G2.1.28
M
F
2
x
.g
"C" and "D" plausibility: ERCW pumps are the same type ofpump
performing the same function.
If an applicant had a misconception that
S
they were both sequenced on the bus, why would it make any difference
which pump starts first? Are there other pumps in the plant that both get
sequenced on a bus and the order of that sequence is determined by a
switch position that is manipulated by the operators? Discuss with
licensee. Ifthere is more plausibility here than I realize, then this question
may be SAT.
Qreplaced. OK MAB 02/04/2008
"C' and "D" should have an "in which" added.
Qreplaced. OK MAB 02/04/2008
The second part of"A" and "C" appears to be a little cryptic. Is this easily
understandable?
T
Q replaced. OK MAB 02/04/2008
69
G2.2.26
N
H
2
S
Qis SAT.
REF
70
G2.2.33
B
H
2
B
Is there an extra space between "and" and "the"? Corrected. MAB
02/0412008
02/0412008
67 G2.I.27 B H 2 S Third bullet: "start"shouldbeplural.Fixed.MAB
S
02/04/2008Page18 of29  
"B" is not plausible. With dumps open and rods inserting it is not credible
ES-401,Rev.9
for an applicant to have a misconception that temperature will go up.
WrittenExamReview
Consider changing the temperature to something lower than 559 F, but
Worksheet Sequoyah 2008-301FormES-401-9
plausible. Answer choices changed to iterate on temps and speed. OK
Q#KiA#BLLPsychometricFlawsContentFlaws
MAB 02/04/2008
U Comment M00StemCues T/F 1 Non>1NonPartialMin
71
Q-SRO E Explanation
G2.3.2
N K D FocnsCredCred KiA Only SDistDist B/W Fourth bullet: "level" shouldbeplural.Fixed.MAB
N
02/04/2008
H
Be consistentwithtenseinall
2
answer choices.Consider: A.Arming conditions
S
for AMSACwerenot present.B.AMSAC actuated.C.Arming conditions
Q is SAT.
were present, but actuation conditions
72
were not present.D.AMSAChasnot actuated,butwill actuateafterthe appropriate
G2.3.9
time delay ifSGlevels stabilizeattheir current values.Fixed.MAB 02/04/2008
B
68 G2.1.28 M F 2 x.g"C" and"D" plausibility:
F
ERCWpumpsarethesametype
2
of pump performingthesamefunction.Ifan
S
applicanthada misconception
Be consistent with periods behind bullets. Fixed. MAB 02/04/2008
that Stheywereboth
Q is SAT.
sequencedonthebus,whywouldit
73
make any differencewhichpumpstartsfirst?Are
G2.3.l0
there other pumpsinthe plantthatbothget
B
sequencedonabusandtheorder
F
of that sequence is determinedbya switch positionthatis manipulatedbythe operators?
I
Discuss with licensee.Ifthereismore
x
plausibilityherethanIrealize,thenthis
x
questionmaybeSAT.Q replaced.OKMAB 02/04/2008"C'and"D" shouldhavean"in which" added.Q replaced.OKMAB 02/04/2008
x
The second part of"A" and"C" appearstobealittlecryptic.Isthiseasily
.g
understandable?
"A" is not plausible. If"A" is correct, then any of the others would be
T Q replaced.OKMAB 02/04/2008
Page 19 of29
69 G2.2.26 N H 2 S QisSAT.REF 70G2.2.33B H 2 B Is thereanextra space between"and" and"the"?Corrected.
 
MAB 02/0412008
ES-401, Rev. 9
S"B"isnot plausible.Withdumpsopenandrods
Written Exam Review Worksheet
insertingitisnot credibleforan applicant to have a misconception
Sequoyah 2008-301
that temperaturewillgoup.Consider changing the temperature
Form ES-401-9
to something lower than559F,but plausible.
Q#
Answer choices changed to iterateontempsandspeed.OK
KlA#
B
L
L
Psychometric Flaws
Content Flaws
U
Comment
M
0
0
Stem
Cues
T/F
1 Non
>1 Non
Partial
Min
Q~
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KIA
Only
S
Dist
Dist
B/W
also. TIle question asks for which would be correct to exit the RCA. If it
S
is correct to simply exit, then doing anything above and beyond that would
not be wrong. Q replaced. OK MAB 02/04/2008
"B" is not plausible. PCM-IB monitors alarm quite often. Can you
imagine how many whole body counts would be needed if this were true?
How many times have these applicants had a PCM-IB alarm?
Q replaced. OK MAB 02/04/2008
This question does not discriminate at the appropriate level. An RO
applicant getting tins question correct does not provide useful information
in making a license decision. Q replaced. OK MAB 02/04/2008
74
G2.4.16
B
H
2
S
Typo in "D": E-O? vice E-O. Fixed. MAB 02/04/2008
Typo "D": should "exist" be plural? Licensee failed to correct. It does not
affect tec1micalaccuracy ofquestion. I would make them change it if it
appeared only in a distractor. OK
MAB 02/04/2008
MAB 02/04/2008
71 G2.3.2 N H 2 S QisSAT.72 G2.3.9 BF2 S Be consistent
This question looks very familiar. No response needed from licensee - I
with periods behind bullets.Fixed.MAB 02/04/2008
am just noting this. Noted. MAB 02/04/2008
QisSAT.73 G2.3.l0 B F I xxx.g"A"isnot plausible.If"A" is correct,thenany oftheotherswouldbePage19 of29
75
ES-401,Rev.9
02.4.22
WrittenExamReview
N
Worksheet Sequoyah 2008-301FormES-401-9
F
Q#KlA#BLL Psychometric
2
Flaws Content Flaws U Comment M00 Stem Cues T/F1Non>1Non Partial MinSRO E Explanation
S
N K D FocusCredCred KIA Only S Dist Dist B/Walso.TIlequestionasksforwhichwouldbecorrecttoexittheRCA.Ifit
Why is "Larger" capitalized in "A' and "D"? Corrected. MAB
Siscorrecttosimplyexit,thendoinganythingaboveandbeyondthatwouldnotbewrong.Qreplaced.OKMAB
02/04/2008"B"isnotplausible.
PCM-IBmonitorsalarmquiteoften.Canyouimaginehowmanywholebodycountswouldbeneededifthisweretrue?Howmanytimeshavetheseapplicantshada
PCM-IB alarm?Qreplaced.OKMAB
02/04/2008Thisquestiondoesnotdiscriminateatthe
appropriatelevel.AnROapplicantgetting
tinsquestioncorrectdoesnotprovideusefulinformationinmakingalicensedecision.Qreplaced.OKMAB
02/04/2008
02/04/2008
74 G2.4.16BH 2 STypoin"D":E-O?vice
SROEXAM
E-O.Fixed.MAB 02/04/2008Typo"D":should"exist"beplural?Licenseefailedtocorrect.
76
Itdoesnotaffecttec1micalaccuracy
008G2.4.49
ofquestion.Iwouldmakethemchangeitifitappearedonlyinadistractor.OK
NJH
MAB 02/04/2008Thisquestionlooksveryfamiliar.Noresponseneededfromlicensee-Iamjustnotingthis.Noted.MAB
2
02/04/2008
II
75 02.4.22 N F 2 SWhyis"Larger"capitalizedin"A'and"D"?Corrected.MAB
"C": Is there an extra space between "and" and "immediately"?
~
Q and KIA changed. OK MAB 02/04/2008
S
"D": Is there an extra space between "in" and "E-O"?
Q and KIA changed. OK MAB 02/04/2008
What pressure causes phase B to actuate?
Would it be incorrect for the SRO to direct starting of the EDG? Is this an
automatic action that should have occurred? Does SQ have all Admin
procedure that states that it is permissible to manually perform an auto
action that should have occurred?
Q and KIA changed. OK MAB 02/04/2008
If this question is determined to require knowledge of procedure selection,
i.e. beyond general rules of procedure usage, then it will be acceptable as
an SRO question. Discuss SRO-only learning objectives that may be
available to support this question as SRO only.
Q and KIA changed. OK MAB 02/04/2008
It is my knowledge that a general Westinghouse rule of usage is that
Page 20 of29
 
ES-401, Rev. 9
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KlA#
B
L
L
Psychometric Flaws
Content Flaws
U
Comment
M
0
0
Stem
Cues
T/F
1 Non
>1 Non
Partial
Min
Q=
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KIA
Only
S
Dist
Dist
BIW
operators do not exit E-O until E-O instructs them to exit. I would view this
as RO knowledge unless there is some plant documentation that would
state otherwise.
Q and KiA changed. OK MAB 02/04/2008
77
029EA2.09
M
H
2
x
Y
Discuss deleting parameters at the time oftransition. They do not add
plausibility to "turbine not tripped"; therefore, they may not be necessary
S
information.
PRT values deleted. OK MAB 02/04/2008
Change feed water flow to something that is just over the limit. Like 120
gpm to each SG. Heat sink requirements are 440 gpm total. Discuss with
licensee.
FW flow values revised. OK MAB 02/0412008
Not SRO-only: ROs are required to know status trees. Therefore, the
question can be answered by knowing that H.l is not required to be entered
and that the turbine is tripped. Both of these knowledge items are required
RO-knowledge.
(G2.4.21 has an RO importance rating of 3.7)
Q revised. OK MAB 02/04/2008
78
054AA2.05
N
H
2
x
Y
Not SRO-only: Question requires systems knowledge for response ofthe
MFW B/P Reg Valve, which is RO knowledge. Question also requires
S
knowledge ofAOP and EOP entry conditions, which is also RO
knowledge. Furthermore, the applicant can use systems knowledge to
I
determine that the reactor will not trip and that not SI is present, thereby,
allowing the applicant to eliminate going to E-O, "Reactor Trip or Safety
Injection."
(2.4.1 and 2.4.4 have RO importance ratings of4.3 and 4.0 respectively)
Q revised to make SRO only. OK MAB 02/04/2008
Are the applicants required to go to the AOP? Would an operator be
wrong if the AOP was not entered?
Q revised. OK MAB 02/04/2008
79
057AA2.17
N
H
2
x
y
Is punctuation in second bullet correct?
Q revised. OK MAB 02/04/2008
S
Not SRO-only: Both parts ofthe answer choices can be analyzed using
RO required knowledge. Systems knowledge is required by ROs;
therefore, this question does no require any knowledge that is specific only
to the SRO position.
Q revised. OK MAB 02/04/2008
80
065AA2.01
N
H
2
E
Wording on LCO 3.0.3 is too loose. LeO 3.0.3 is always applicable and
Page 21 of29
 
ES-401, Rev. 9
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KiA#
B
L
L
Psychometric Flaws
Content Flaws
U
Comment
M
0
0
Stem
Cues
T/F
1 Non
>1 Non
Partial
Min
Q=
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KiA
Only
S
Dist
Dist
BIW
licensees are always required to comply with 3.0.3. Change the wording
S
to: Required Actions ofLCO 3.0.3 are required to be performed, OR not
required to be performed. This will not change the meaning of what is
being asked, but it will be more direct and more technically correct to
phrase the second part of each answer choice in this manner.
Incorporated. MAB 02/04/2008
Delete the air pressure in the stem. The ala1111 annunciates, which is
enough to inform the operator that pressure is below 68 psig. Discuss with
licensee. Allowed air pressure to remain. OK MAB 02/0412008
The piece of each answer choice that discusses that fuel movement is
required to be suspended does not add value since it is the same in each
answer choice. The answer choices should only contain the information
needed to make them unique answer choices:
A.
ABGTS Train A remains OPERABLE until Train A
Containment Air Isolation Valve automatically closes, at which
time LCO 3.0.3 required actions would NOT be required to be
taken.
B.
ABGTS Train A remains OPERABLE until Train A
Containment Air Isolation Valve automatically closes, at which
time LCO 3.0.3 required actions would be required to be taken.
C.
Both trains of ABGTS would immediately be INOPERABLE
with the current conditions.
LCO 3.0.3 required actions would
NOT be required to be taken.
D.
Both trains of ABGTS would immediately be INOPERABLE
with the current conditions.
LCO 3.0.3 required actions would
be required to be taken
Incorporated. OK MAB 02/04/2008
81
W/Ell
B
H
I-
x
X?
B
Be consistent with punctuation after bulleted items.
Fixed. MAB
G2.4.48
2
02/04/2008
02/04/2008
SROEXAM76008G2.4.49
S
NJH 2 II"C":Isthereanextraspacebetween"and"and"immediately"?QandKIAchanged.OKMAB
Transfer to RHR containment sump is not plausible. The stem clearly
states that a LOCA Outside Containment is occurring. This distractor must
be replaced. Corrected. OK MAB 02/04/2008
Is there a way to provide some indications in the stem that are indicative of
a LOCA outside containment without telling them that the operators are in
ECA-1.2 due to a WCA in the Aux Bid. Is there a less obvious way to
provide indications ofabnormal radiation in the aux building - i.e. and
ala1111? Containment sump level added. OK MAB 02/04/2008
The easiest fix for this question may be to use the two best answer choices
and then iterate on operator actions, etc. I.E. Iterate on ECA 1.I and E- I
AND then operator actions. Incorporated. MAB 02/04/2008
Page 22 of29
 
ES-401, Rev. 9
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KlA#
B
L
L
Psychometric Flaws
Content Flaws
U
Comment
M
0
0
Stem
Cues
TIF
1 Non
>1 Non
Partial
Min
Q=
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KIA
Only
S
Dist
Dis!
B/W
-
Another possible fix may be to test procedure path for two transitions.
Operators would go to ECA-I.I, then to ...
Distractors revised. OK MAB 02/0412008
82
W/EI2
B
H
2
x
E
Questions testing knowledge of what operators "should" do are too
G2.I.32
ambiguous to ask. Questions must ask what operators are required to do.
S
This may just be a phrasing issue with the question statement, but
questions need to test requirements.
Corrected. OK MAB 02/0412008
Distractor "B": Not plausible because there is not a credible
misconception that could lead an applicant to stop terminating SI but
remain in the same procedure. At least with the procedure transition they
need to evaluate ifthey are to stop the SI termination in order to make the
transition. Corrected. MAB 02/04/2008
Modify the stem slightly to place the operators at Step 14 where they are
monitoring for SI termination criteria and provide them the criteria that are
indicative of them proceeding to step 15. Answer choices could be
something like:
A.
Terminate SI in ECA-2. I, then transition to E-2
B.
Transition to E-2, then terminate SI
C.
Remain in ECA-2. I. SI termination criteria are not currently
met.
D.
Transition to E-2, SI termination criteria are not currently met.
Discuss this option with licensee.
Incorporated. OK MAB 02/04/2008
83
003G2.2.22
N
F
I
x
x
.y
Can the stem state that the control rod drops to the middle ofthe core?
Otherwise, a rod dropping to the bottom makes "B" non-plausible because
S
there would not be any axial concerns for a rod that falls to the bottom.
Added. OK MAB 02/04/2008
"D" is a correct statement and could successfully be argued as correct by
an applicant. The accident analysis will remain valid at 75% power.
Corrected. MAB 02/0412008
Is there a more specific option to use for "A"? Any reactivity 1power
redistribution issue is going to be a fuel integrity concern.
"A" allowed to remain. OK MAB 02/04/2008
A more specific choice for "A" and replacement of"D" could result in a
satisfactory question.
"D" revised and "A" allowed to remain with the
other changes made to the question. OK MAB 0210412008
Page 23 of29
 
ES-401, Rev. 9
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KiA#
B
L
L
Psychometric Flaws
Content Flaws
U
Comment
M
0
0
Stem
Cues
T/F
1 Non
>1 Non
Partial
Min
Q=
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KiA
Ouly
S
Dist
Dist
B/W
84
005AA2.03
N
H
2
X
X
.y
Delete "causing a runback from the stem".
Applicants should have
enough information with the plant at 86% and a MFP trip to understand
S
that a runback will occur. Discuss with licensee to ensure that this is the
case.
Deleted. OK MAB 02/04/2008
Is second bullet worded corrected?
Corrected. MAB 02/04/2008
Not SRO-only knowledge: ROs are required to know reactor trip criteria.
Q revised and allowed for SRO due to location oftrip criteria. MAB
02/04/2008
02/04/2008
S"D":Isthereanextraspacebetween"in"and"E-O"?QandKIAchanged.OKMAB
Is "D" a subset of"C"? Is (ripping the reactor a means of removing the
02/04/2008WhatpressurecausesphaseBtoactuate?WoulditbeincorrectfortheSROtodirectstartingoftheEDG?Isthisanautomaticactionthatshouldhaveoccurred?DoesSQhave
Unit from service within 6 hours? This may be able to be alleviated by
all Adminprocedurethatstatesthatitis
changing the wording of the question to ask for the specific requirements
permissibletomanuallyperformanautoactionthatshouldhaveoccurred?QandKIAchanged.OKMAB
as stated in AOP-C.OI. Corrected. MAB 02/0412008
02/04/2008Ifthisquestionisdeterminedtorequireknowledgeofprocedureselection,i.e.beyondgeneralrulesof
85
procedureusage,thenitwillbeacceptableasanSROquestion.DiscussSRO-onlylearningobjectivesthatmaybeavailabletosupportthisquestionasSROonly.QandKIAchanged.OKMAB
051AA2.02
M
H
2
X
.y
Is second bullet worded correctly? Corrected. MAB 02/04/2008
S
Delete all unnecessary information in answer choices. In other words,
delete the information that is not needed to make the answer choices
unique.
All ofthe extraneous procedure entry information is not needed to
make the answer choice unique. I.E.:
A.
Manual turbine trip criteria is currently met.
B.
Manual reactor trip criteria is currently met.
C.
Manual turbine trip criteria will be met ifcondenser pressure
I
exceeds 2.7 psia and cannot be restored within 5 minutes.
D.
Manual turbine trip criteria will be met ifcondenser pressure
exceeds 2.7 psia and cannot be restored within 5 minutes.
Extra info deleted from answer choices. MAB 02/0412008
Question should be worded in the plural fonn. Currently it is worded for
singular (or plural), but each answer choice has more than one item.
Corrected. MAB 02/0412008
Not SRO-only: Reactor Trip criteria is RO knowledge. The above
comments will be irrelevant unless the SRO-only issue is corrected.
(G2.1.7 and G2.4.l have RO IRs of3.7 and 4.3 respectively)
Allowed for SRO exam due to knowledge of being able to stay in AOP to
address vacuum problem for 5 minutes. MAB 02/04/2008
86
W/E02
N
H
I
x
.y
Should "Safety" be capitalized in second bullet? "Injection" is also now
EA2.2
capitalized. OK MAB 02/04/2008
S
"B" and "D": This reviewer does not understand how the conditions in the
Page 24 of29
 
ES-401, Rev. 9
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KlA#
B
L
L
Psychometric Flaws
Content Flaws
V
Comment
M
0
0
Stem
Cues
T/F
1 Non
>1 Non
Partial
Min
Q~
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KIA
Only
S
Dist
Dist
B/W
stem result in LCO 3.0.3 being plausible. There is not a reasonable
misconception that would lead an applicant to thinking that LCO 3.0.3.
Corrected. MAB 02/04/2008
"C" and "0": Nothing has really occurred in the stem except for an
inadvertent SI. There is no reasonable misconception that would lead an
applicant to E-I for a LOCA.
Condition in the stem revised and distractors changed. OK.MAB
02/04/2008
02/04/2008
Itismyknowledgethatageneral
TIle lack of plausibility in the distractors results in an LOD= I, which does
WestinghouseruleofusageisthatPage20 of29
not allow this question to discriminate between a competent and less than
ES-401,Rev.9
competent SRO. Q revised to bring to acceptable level. OK MAB
WrittenExamReview
Worksheet Sequoyah 2008-301FormES-401-9
Q#KlA#BLLPsychometricFlawsContentFlaws
U Comment M00StemCuesT/F
1 Non>1 Non Partial Min Q=SRO E Explanation
NKD Focus Cred Cred KIA Only S Dist Dist BIW operatorsdonotexitE-OuntilE-O
instructs themtoexit.I wouldviewthisasRO knowledge unless thereissome plant documentationthatwould state otherwise.Qand KiA changed.OKMAB 02/04/2008
77 029EA2.09MH2 x Y Discuss deleting parametersatthe time of transition.
Theydonotadd plausibility
to"turbine not tripped";therefore,theymaynotbe
necessary S information.
PRT values deleted.OKMAB 02/04/2008
Changefeedwaterflowto
somethingthatis justoverthelimit.Like120
gpmtoeachSG.Heat sink requirementsare440gpmtotal.
Discuss with licensee.FWflowvalues
revised.OKMAB 02/0412008
Not SRO-only:ROsare requiredtoknow status trees.Therefore, the questioncanbe answered by knowing that H.lisnot requiredtobe enteredandthatthe
turbine is tripped.Both of these knowledge items are required RO-knowledge.(G2.4.21hasanRO
importance
ratingof3.7)Q revised.OKMAB 02/04/2008
78 054AA2.05NH2 x Y Not SRO-only: Question requires systems knowledge for response of the MFW B/PRegValve, whichisRO knowledge.
Question also requires S knowledge ofAOPandEOPentry
conditions, whichisalsoRO knowledge.
Furthermore, the applicantcanuse systems knowledge to I determinethatthe reactorwillnottripandthatnotSIis
present, thereby, allowing the applicant to eliminate goingtoE-O,"ReactorTripor Safety Injection."(2.4.1and2.4.4
have RO importance
ratings of4.3and4.0 respectively)
Q revised to makeSROonly.OKMAB
02/04/2008Arethe applicants
requiredtogototheAOP?
Would an operator be wrong iftheAOPwasnot
entered?Q revised.OKMAB 02/04/2008
79 057AA2.17NH 2 x y Is punctuation
in second bullet correct?Q revised.OKMAB 02/04/2008
S Not SRO-only: Both parts of the answer choicescanbe analyzed using RO required knowledge.
Systems knowledge is requiredbyROs;therefore, this questiondoesno require any knowledgethatis specific onlytotheSRO position.Q revised.OKMAB 02/04/2008
80 065AA2.01 NH2 E WordingonLCO3.0.3istooloose.
LeO3.0.3is always applicable
and Page 21 of29
ES-401,Rev.9
WrittenExamReview
Worksheet Sequoyah 2008-301FormES-401-9
Q#KiA#BLLPsychometricFlaws
Content Flaws U Comment M00StemCues T/F1Non>1Non Partial Min Q=SRO E Explanation
NKD FocusCredCred KiA Only SDistDist BIW licensees are always required to comply with 3.0.3.Change the wordingSto: Required Actions ofLCO3.0.3are requiredtobe performed, OR not requiredtobe performed.
This will not change the meaning ofwhatis being asked,butitwillbe
more direct and more technically
correct to phrase the second part of each answer choiceinthis manner.Incorporated.
MAB 02/04/2008
Deletetheair pressureinthestem.
The ala1111 annunciates, which is enough to inform the operator that pressure is below68psig.Discuss with licensee.Allowed air pressure to remain.OK MAB 02/0412008
The piece of each answer choice that discusses that fuel movement is requiredtobe suspended does not add value sinceitisthe sameineach answer choice.The answer choices should only contain the information
needed to make them unique answer choices: A.ABGTS Train A remains OPERABLE until Train A Containment
Air Isolation Valve automatically
closes, at which timeLCO3.0.3 required actions would NOT be requiredtobe taken.B.ABGTS Train A remains OPERABLE until Train A Containment
Air Isolation Valve automatically
closes, at which timeLCO3.0.3 required actions would be requiredtobe taken.C.Both trains of ABGTS would immediately
be INOPERABLE
with the current conditions.
LCO 3.0.3 required actions would NOT be requiredtobe taken.D.Both trains of ABGTS would immediately
be INOPERABLEwiththe current conditions.LCO3.0.3 required actions would be requiredtobe taken Incorporated.
OK MAB 02/04/2008
81 W/Ell B H I-xX?B Be consistent
with punctuation
after bulleted items.Fixed.MAB G2.4.48 2 02/04/2008
S Transfer to RHR containment
sump is not plausible.
The stem clearly states that a LOCA Outside Containment
is occurring.
This distractor
must be replaced.Corrected.
OK MAB 02/04/2008
Is thereawayto provide some indicationsinthe stemthatare indicative
of a LOCA outside containment
without telling themthatthe operatorsarein ECA-1.2 duetoa WCA in theAuxBid.Is therealess obviouswayto provide indications
of abnormal radiationintheaux building-i.e.and ala1111?Containment
sump level added.OKMAB 02/04/2008
The easiestfixforthis
question maybetousethetwobestanswer
choices and then iterate on operator actions,etc.I.E.Iterate on ECA 1.I andE-I AND then operator actions.Incorporated.
MAB 02/04/2008
Page 22 of29
ES-401,Rev.9
WrittenExamReview
Worksheet Sequoyah 2008-301FormES-401-9
Q#KlA#BLLPsychometricFlawsContentFlaws
U Comment M00 StemCuesTIF1Non>1NonPartialMin
Q=SRO E Explanation
NKD Focus Cred Cred KIA Only SDistDis!B/W-Another possiblefixmaybetotest
procedurepathfortwo
transitions.
Operatorswouldgoto ECA-I.I,thento...Distractors
revised.OKMAB 02/0412008
82 W/EI2 B H 2 x E Questions testing knowledge of what operators"should"doaretoo G2.I.32 ambiguoustoask.Questions must ask what operators are requiredtodo.SThismay justbea phrasing issuewiththe question statement, but questionsneedtotest
requirements.
Corrected.OKMAB 02/0412008
Distractor"B": Notplausiblebecause
thereisnota credible misconception
that couldleadan applicanttostop terminatingSIbut remaininthe same procedure.Atleastwiththe
procedure transition
theyneedto evaluate iftheyaretostoptheSI
termination
in order to make the transition.
Corrected.
MAB 02/04/2008
Modify the stem slightly to place the operatorsatStep14 wheretheyare monitoringforSI termination
criteria and provide them the criteriathatare indicative
of them proceedingtostep15.Answer choicescouldbe something like: A.TerminateSIin ECA-2.I,then transitiontoE-2 B.TransitiontoE-2,then
terminate SI C.Remain in ECA-2.I.SI termination
criteriaarenot currently met.D.TransitiontoE-2,SI termination
criteriaarenot currently met.Discuss this option with licensee.Incorporated.OKMAB 02/04/2008
83 003G2.2.22
NFI x x.yCanthe stemstatethatthe
control rod dropstothe middle ofthecore?Otherwise,arod droppingtothe bottom makes"B" non-plausible
because S therewouldnotbeanyaxial
concernsforarodthatfallstothe
bottom.Added.OKMAB 02/04/2008"D"isa correct statement and could successfully
be argued as correct by an applicant.
The accident analysis will remainvalidat75%
power.Corrected.
MAB 02/0412008
Is thereamore specific optiontousefor"A"?Any reactivity
1 power redistribution
issue is goingtobeafuel integrity concern."A" allowed to remain.OKMAB 02/04/2008
A more specific choice for"A" and replacement
of"D" could resultina satisfactory
question."D" revised and"A" allowed to remain with the other changes madetothe question.OKMAB 0210412008
Page 23 of29
ES-401,Rev.9
WrittenExamReview
Worksheet Sequoyah 2008-301FormES-401-9
Q#KiA#BLL Psychometric
Flaws Content Flaws U Comment M00StemCues T/F1Non>1Non Partial MinQ=SRO E Explanation
NKD FocusCredCred KiA Ouly SDistDist B/W 84 005AA2.03 N H 2 X X.y Delete"causing a runbackfromthestem".
Applicants
should have enough informationwiththeplantat86%andaMFPtripto
understandSthata runbackwilloccur.Discusswith
licenseetoensurethatthisisthe
case.Deleted.OKMAB
02/04/2008Issecondbullet
worded corrected?
Corrected.
MAB 02/04/2008
Not SRO-only knowledge:ROsare requiredtoknow reactortripcriteria.
Q revised and allowedforSROduetolocation
oftripcriteria.MAB
02/04/2008
Is"D" a subset of"C"?Is(rippingthe
reactorameansof removing theUnitfrom servicewithin6hours?Thismaybeabletobe
alleviated
by changing the wording ofthequestiontoaskforthe
specific requirementsasstatedinAOP-C.OI.
Corrected.
MAB 02/0412008
85 051AA2.02 M H 2 X.y Is secondbulletworded
correctly?
Corrected.
MAB 02/04/2008SDeleteall
unnecessary
information
in answerchoices.Inotherwords,deletethe informationthatisnotneededtomaketheanswer
choicesunique.All
of the extraneous
procedure entry informationisnot needed tomaketheanswer
choiceunique.I.E.:
A.Manual turbine trip criteria is currently met.B.Manual reactor trip criteria is currently met.C.Manual turbine trip criteriawillbemet if condenser pressure Iexceeds2.7psiaand
cannot be restoredwithin5minutes.
D.Manual turbine trip criteriawillbemet if condenser pressureexceeds2.7psiaand
cannot be restoredwithin5minutes.Extrainfo deleted from answerchoices.MAB
02/0412008
02/0412008
Question shouldbewordedinthepluralfonn.
87
Currentlyitiswordedfor
W/EI6
singular(orplural),buteachanswer
M
choicehasmorethanoneitem.
H
Corrected.
2
MAB 02/0412008NotSRO-only:
x
Reactor Trip criteriaisRO knowledge.Theabove commentswillbe irrelevantunlessthe SRO-onlyissueiscorrected.(G2.1.7and
B
G2.4.lhaveROIRs of3.7and4.3 respectively)
Can "The reactor is in Mode 6 with" be deleted from first bullet?
AllowedforSROexamdueto
G2.2.31
knowledgeofbeingabletostayinAOPto
2
address vacuum problemfor5minutes.MAB
Deleted. MAB 02/0412008
02/04/2008
S
86 W/E02 N H I x.y Should"Safety" be capitalizedinsecondbullet?"Injection"isalsonow EA2.2 capitalized.OKMAB 02/04/2008
Not SRO-only: ROs are licensed to move fuel and therefore are required
S"B"and"D":This
to know how to handle a loss ofrefueling water event.
reviewerdoesnot understandhowthe conditionsinthePage24 of29
TIns is snpported
ES-401,Rev.9
by KIA 036AAI.04, which has an RO IR of 3.7. Lowering water level is a
WrittenExamReview
fuel handling incident, which is supported by AOP-M.04, Refueling
Worksheet Sequoyah 2008-301FormES-401-9
Malfunctions.
Q#KlA#BLL Psychometric
See comment below. OK MAB 02/0412008
Flaws Content Flaws V Comment M00 Stem Cues T/F1Non>1Non Partial MinSRO E Explanation
This was a modified question. TIle reviewer would like to see a copy of
N K D FocusCredCred KIA Only SDistDist B/W stem resultinLCO3.0.3
the source question, from which this one was modified. Provided. MAB
being plausible.
Thereisnota reasonable
misconceptionthatwouldleadan
applicant to thinkingthatLCO3.0.3.
Corrected.
MAB 02/04/2008"C" and"0": Nothinghasreally occurredinthestem exceptforan inadvertent
SI.Thereisno reasonable
misconceptionthatwouldleadan
applicanttoE-IforaLOCA.
Conditioninthestem revised and distractors
changed.OK.MAB 02/04/2008
TIle lack of plausibilityinthe distractors
resultsinanLOD=I,whichdoesnotallowthis
question to discriminate
between a competentandlessthan
competentSRO.Q revised to bring to acceptablelevel.OKMAB
02/0412008
02/0412008
87 W/EI6 M H 2 x B Can"The reactorisin Mode 6 with" be deletedfromfirst bullet?G2.2.31 2 Deleted.MAB 02/0412008
Do ROs currently move fuel at SQ? Ifnot, when was the last time an RO
S Not SRO-only:ROsare licensed to movefueland therefore are requiredtoknowhowto
moved irradiated fuel at SQ?
handlealoss of refueling water event.TIns is snpported by KIA 036AAI.04, whichhasanROIR of 3.7.Loweringwaterlevelisa
Is there an SRO-only leaming objective to
fuel handling incident, which is supported by AOP-M.04, Refueling Malfunctions.
support tins being SRO-only knowledge? Based on the above reasoning
See comment below.OK MAB 02/0412008Thiswasa modified question.TIle reviewer wouldliketoseeacopy
tins falls into the category of an RO question; however, ifsufficient
of the source question, from whichthisonewas
justification can be provided it may be permissible to allow this on the
modified.Provided.MAB 02/0412008DoROs currently movefuelatSQ?Ifnot, whenwasthelast
SRO exam.
timeanRO moved irradiatedfuelatSQ?Is
Licensee provided sufficient justification for SRO only level. MAB
there an SRO-only leaming objective to support tins being SRO-only knowledge?
Basedonthe above reasoning tinsfallsintothe
category ofanRO question;however, if sufficient
justificationcanbe provideditmaybe permissibletoallowthisontheSROexam.Licensee provided sufficient
justificationforSROonlylevel.
MAB 02/04/2008
88 008A2.09 M H 2 x:y Reactor Physics and systems knowledgearetheonly
requirements
for answering this question.Plant responsetoa controller
failure is systems S knowledge that is required ofanRO.Determining
whetheratemp change adds positive or negative reactivityisbasicGFE
reactor physics knowledge.
This questioncanbe answeredonlyby knowing GFE knowledge.
No SRO-only knowledge is required to answer this question.Q replaced.OKMAB 02/04/2008
89 0IOG2.4.38NFI x:y"A" and"0": 5 minutesisnot plausible.
LeadingtoaLOD I.Page 25 of29
ES-401,Rev.9
WrittenExamReview
Worksheet Sequoyah 2008-301FormES-401-9
Q#KlA#BLLPsvchometricFlawsContentFlaws
U Comment M00StemCuesT/F1Non>1Non Partial Min Q=SRO E Explanation
N K D FocusCredCred KIA Only S Dist Dist B/W Q revised to address concern.OKMAE 02/0412008
S QuestionLODwouldbe
acceptableifthe acceptable
ODS notification
requirementistested, instead ofthe15 minutetodeclare.Test
whether the requirement
to notifyODSis5 minutesfromtheeventor5
minutes from making the declaration.Thiswilltest
knowledge of whethertheODS notification
is requiredtobe madepriortoorafterevent
declaration.
Incorporated.OKMAB 02/0412008
90 013A2.05 N H 2 x Y Questionisnot SRO-only:Canthis question be answeredusingonly systems knowledge?Thefirst piece ofeachanswer
choicecanbe S answered by knowingwhatthe cause of the condition couldbe,whichis
systems knowledge.Thislimitsthe
potential answer choices to"C" and"D"usingRO knowledge.
Applicantscanalso determinethatthe pumpswillnotstart
manually basedonthe physical configuration
oftheplant,I.E.
systems knowledge.
Therefore, this questioncanbe answeredbyan applicant without needingtouseany SRO-only level knowledge.
Concerns addressed.
Distractorsandstemrevised.OKMAB
02/04/2008
02/04/2008
91 103G2.2.l4
88
NF2 STiethe second half of the questiontothe procedure justasyoudidwith
008A2.09
when Containment
M
Closure Control is requiredtobe implemented.I.E....whowill
H
maintain the listing of the Containment
2
Closure Exceptions
x
ineffectin accordance
:y
with 0-GO-15.Incorporated, MAB 02/04/2008
Reactor Physics and systems knowledge are the only requirements for
92 029G2.4.46
answering this question. Plant response to a controller failure is systems
N H 3 x x?E Question is backwardlogic.Thisis
S
discouraged
knowledge that is required of an RO. Determining whether a temp change
by NUREG-I 021;,:1 however,itisnot prohibited.
adds positive or negative reactivity is basic GFE reactor physics
Licenseedoesnotneedtoaddressthis
knowledge. This question can be answered only by knowing GFE
comment iftheyare satisfiedwiththeir applicants
knowledge. No SRO-only knowledge is required to answer this question.
receiving this question.SNoted.MAB
Q replaced. OK MAB 02/04/2008
02/04/2008
89
Can"B" be eliminated
0IOG2.4.38
using systems knowledge?WillABI resultinan auto shutdown ofUnitI containmentpurgewhen ORA-90-10IA
N
alarmswithUnitI Lower ContainmentPurgein progress?Discusswithlicensee.Thiswill determinethestatus of the question.ABIwillnotauto
F
SIDUIpurge.After
I
discussion
x
with licensee,QisOK.MAB 02/0412008
:y
93 034A2.02 NF2 x E"B": Rad Control Managerisnot plausible becausethisisnotan
"A" and "0": 5 minutes is not plausible. Leading to a LOD
irradiatedfuelbundle.
I.
Contamination
Page 25 of29
and exposure shouldnotbeaconcern.
 
SFixed.MAB 02/0412008
ES-401, Rev. 9
Consider the following changes:.Per AOP-M.04,whichone of the following correctly describes the lowest level of approval required for approval of recovery instructions?
Written Exam Review Worksheet
A.Refueling SRO B.Shift ManagerPage26 of29  
Sequoyah 2008-301
ES-401,Rev.9
Form ES-401-9
WrittenExamReview
Q#
Worksheet Sequoyah 2008-301FormES-401-9
KlA#
Q#KlA#BLL Psychometric
B
Flaws Content Flaws U Comment M00 Stem Cnes T/F1Non>1Non Partial MinSRO E Explanation
L
N K D Focus Cred Cred KIA Only SDistDist B/W C.Operations
L
Manager D.Plant Manager Incorporated.OKMAB 02/04/2008
Psvchometric Flaws
94 G2.1.12 N H 2SIs second bullet worded correctly?Fixed.MAB 02/04/2008
Content Flaws
REF Be consistent
U
with periods after bullets.Fixed.MAB 02/04/2008
Comment
95 G2.1.33 N H 2 x:y KIA Match: The KIA requiresthattechspec
M
entry conditionsaretested.
0
This question skips that partandthenteststhe
0
actionsthatare required S once the techspecis entered.Q revised.OKMAB 02/0412008TIlestemdoes
Stem
not even statethatfuelis
Cues
being moved;therefore, stopping fuel movementdoesnot appearlikea reasonable
T/F
answer.Answer choices revised.OKMAB 02/05/2008
1 Non
Question is disjointed."A" and"B" are testing knowledge of mode change requirements
>1 Non
and"C" and"D'are testing knowledge of fuel movement requirements.Thisisnotthe
Partial
reason the question is unsat, but simply an observation.
Min
Answer choices revised.OKMAB 02/0512008
Q=
96G2.2.8BF2.g Consider wordingtheQasfollows:
SRO
Which one of the following correctly describes the MINIMUM required S qualificationsforthe person(s)PREPARING the safety evaluation
E
I paperwork in accordance
Explanation
with SPP-9.4, IOCFR50.59
N
Evaluations
K
of Changes, Tests, and Experiments?
D
Incorporated.OKMAB 02/0512008
Focus
97 G2.3.l B H 2.gThetopicand
Cred
construction
Cred
of the question is satisfactory, There are concemswiththe wording of the"Why" column choice for"A" and"B".S Where is"maintain critical safety function" defined?Woulditbe wrongforan applicant to believe that the emergency exposurewouldbe needed to prevent the conditions
KIA
from elevating beyond Yellow?Discuss with licensee.Q replaced.OKMAB 02/05/2008
Only
98 G2.3.6MF 2 x.gTiethe questiontothe procedure, I.E.: Which one ofthe following.....in accordance
S
with"procedure
Dist
name and number"?S Incorporated.OKMAB 02/05/2008Bealittle more precisewiththefirst
Dist
piece of each answer choice.I.E.Approval not permitted.
B/W
I Approval is permitted.
Q revised to address concern. OK MAE 02/0412008
The above suggestionisalittle more accurate becausetheSRO could just choosetonotsignit, which is neither disapproving
S
or approving.
Question LOD would be acceptable if the acceptable ODS notification
ThePage27 of29  
requirement is tested, instead ofthe 15 minute to declare. Test whether the
ES-401,Rev.9
requirement to notify ODS is 5 minutes from the event or 5 minutes from
WrittenExamReview
making the declaration. This will test knowledge of whether the ODS
Worksheet Sequoyah 2008-301FormES-401-9
notification is required to be made prior to or after event declaration.
Q#KiA#BLL Psychometric
Incorporated. OK MAB 02/0412008
Flaws Content Flaws U Comment M00StemCues T/F1Non>1Non PartialMinQ=SRO E Explanation
90
N K D Focus Cred Cred KiA Only SDistDist BIW above wordingcoversallcasesandspeaks
013A2.05
directlytothe procedure requirement.
N
Incorporated.OKMAB 02/05/2008Deletethelast
H
piece of"D":",but dilution flow requirements
2
are raisedduetothe higher activity."Thisreallydoesnotaddto
x
plausibility
Y
becauseitisnot neededtomakethe answer choiceunique.Ifan
Question is not SRO-only: Can this question be answered using only
applicant knows whethertheSMis requiredtoapprove,thenthis
systems knowledge?
extraneous
The first piece of each answer choice can be
information
S
is not meaningful.
answered by knowing what the cause ofthe condition could be, which is
Incorporated.OKMAB 02/05/2008"B"isnot plausible only because oftheverbiage.Theremaybesome
systems knowledge. This limits the potential answer choices to "C" and
improper grammar,whichiseasilyfixed.I.E.:
"D" using RO knowledge. Applicants can also determine that the pumps
B.Approval not permitted.
will not start manually based on the physical configuration of the plant, I.E.
Cannot release monitortankuntil0-
systems knowledge. Therefore, this question can be answered by an
RM-90-122hasbeen retnmed to OPERABLE status.Incorporated.OKMAB 02/05/2008Whatdoes"two independent
applicant without needing to use any SRO-only level knowledge.
discharge valve lineups" mean?Wording must be precise and reflect exactlywhatthe proceduresrequire.Dotwo
Concerns addressed. Distractors and stem revised. OK MAB 02/04/2008
lineupsneedtobe performed?Isone lineup performedandthenitis
91
independently
103G2.2.l4
verified?Answer choices modified.OKMAB 02/05/2008
N
ODCMstatesthattwo
F
qualified staff members independently
2
verify release rate calculations.
S
The answer choicesinthe questionsstatesthat2
Tie the second halfof the question to the procedure just as you did with
release rate calculations
when Containment Closure Control is required to be implemented. I.E.
are verified.Iamnotsurethatthese
...who will maintain the listing ofthe Containment Closure Exceptions in
requirements,asstated,are
effect in accordance with 0-GO-15.
exactlythesame.Discusswithlicensee.
Incorporated, MAB 02/04/2008
, Answer choices modified.OKMAB 02/05/2008
92
99 G2.4.9 B H 2 x x lei Not SRO-only: Knowinghowto recognize pump cavitationandtheactionstotaketo
029G2.4.46
mitigate the cavitationisRO required knowledge.
N
S Knowing that dilutionisnot permittedisalsoRO required knowledge.AllIhourandlesstechspecsareRO
H
knowledge.
3
Equipment protectionactionsarealsoRO
x
knowledge.
x?
Through discussionwithlicensee,CE
E
allowed Q to remain.OKMAB 0210512008
Question is backward logic. This is discouraged by NUREG-I 021;
Therearealso plausibility
,
concernswithtaking
:1
suctionfromVCTwithborontoolow.Thispointis
however, it is not prohibited. Licensee does not need to address this
inconsequentialduetothe questionnotbeing writtenattheSROlevel.
comment if they are satisfied with their applicants receiving this question.
Through discussion
S
with licensee,CEallowed distractorstoremain.OK
Noted. MAB 02/04/2008
Can "B" be eliminated using systems knowledge? Will ABI result in an
auto shutdown of Unit I containment purge when ORA-90-10IA alarms
with Unit I Lower Containment Purge in progress? Discuss with licensee.
This will determine the status of the question.
ABI will not auto SID UI purge. After discussion with licensee, Q is OK.
MAB 02/0412008
93
034A2.02
N
F
2
x
E
"B": Rad Control Manager is not plausible because this is not an irradiated
fuel bundle. Contamination and exposure should not be a concern.
S
Fixed. MAB 02/0412008
Consider the following changes:
. Per AOP-M.04, which one ofthe following correctly describes the
lowest level ofapproval required for approval ofrecovery instructions?
A.
Refueling SRO
B.
Shift Manager
Page 26 of29
 
ES-401, Rev. 9
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KlA#
B
L
L
Psychometric Flaws
Content Flaws
U
Comment
M
0
0
Stem
Cnes
T/F
1 Non
>1 Non
Partial
Min
Q~
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KIA
Only
S
Dist
Dist
B/W
C.
Operations Manager
D.
Plant Manager
Incorporated. OK MAB 02/04/2008
94
G2.1.12
N
H
2
S
Is second bullet worded correctly? Fixed. MAB 02/04/2008
REF
Be consistent with periods after bullets. Fixed. MAB 02/04/2008
95
G2.1.33
N
H
2
x
:y
KIA Match: The KIA requires that tech spec entry conditions are tested.
This question skips that part and then tests the actions that are required
S
once the tech spec is entered.
Q revised. OK MAB 02/0412008
TIle stem does not even state that fuel is being moved; therefore, stopping
fuel movement does not appear like a reasonable answer.
Answer choices revised. OK MAB 02/05/2008
Question is disjointed. "A" and "B" are testing knowledge ofmode change
requirements and "C" and "D' are testing knowledge of fuel movement
requirements. This is not the reason the question is unsat, but simply an
observation.
Answer choices revised. OK MAB 02/0512008
96
G2.2.8
B
F
2
.g
Consider wording the Q as follows:
Which one ofthe following correctly describes the MINIMUM required
S
qualifications for the person(s) PREPARING the safety evaluation
I
paperwork in accordance with SPP-9.4, IOCFR50.59 Evaluations of
Changes, Tests, and Experiments?
Incorporated. OK MAB 02/0512008
97
G2.3.l
B
H
2
.g
The topic and construction of the question is satisfactory, There are
concems with the wording ofthe "Why" column choice for "A" and "B".
S
Where is "maintain critical safety function" defined? Would it be wrong
for an applicant to believe that the emergency exposure would be needed to
prevent the conditions from elevating beyond Yellow? Discuss with
licensee.
Q replaced. OK MAB 02/05/2008
98
G2.3.6
M
F
2
x
.g
Tie the question to the procedure, I.E.: Which one ofthe following . ....
in accordance with "procedure name and number"?
S
Incorporated. OK MAB 02/05/2008
Be a little more precise with the first piece of each answer choice. I.E.
Approval not permitted. I Approval is permitted.
The above suggestion is a little more accurate because the SRO could just
choose to not sign it, which is neither disapproving or approving. The
Page 27 of29
 
ES-401, Rev. 9
Written Exam Review Worksheet
Sequoyah 2008-301
Form ES-401-9
Q#
KiA#
B
L
L
Psychometric Flaws
Content Flaws
U
Comment
M
0
0
Stem
Cues
T/F
1 Non
>1 Non
Partial
Min
Q=
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KiA
Only
S
Dist
Dist
BIW
above wording covers all cases and speaks directly to the procedure
requirement.
Incorporated. OK MAB 02/05/2008
Delete the last piece of"D": ", but dilution flow requirements are raised
due to the higher activity."
This really does not add to plausibility because
it is not needed to make the answer choice unique. If an applicant knows
whether the SM is required to approve, then this extraneous information is
not meaningful.
Incorporated. OK MAB 02/05/2008
"B" is not plausible only because ofthe verbiage. There may be some
improper grammar, which is easily fixed. I.E.:
B.
Approval not permitted. Cannot release monitor tank until 0-
RM-90-122 has been retnmed to OPERABLE status.
Incorporated. OK MAB 02/05/2008
What does "two independent discharge valve lineups" mean? Wording
must be precise and reflect exactly what the procedures require. Do two
lineups need to be performed? Is one lineup performed and then it is
independently verified?
Answer choices modified. OK MAB 02/05/2008
ODCM states that two qualified staffmembers independently verify
release rate calculations. The answer choices in the questions states that 2
release rate calculations are verified. I am not sure that these requirements,
as stated, are exactly the same. Discuss with licensee.
,
Answer choices modified. OK MAB 02/05/2008
99
G2.4.9
B
H
2
x
x
lei
Not SRO-only: Knowing how to recognize pump cavitation and the
actions to take to mitigate the cavitation is RO required knowledge.
S
Knowing that dilution is not permitted is also RO required knowledge.
All I hour and less tech specs are RO knowledge.
Equipment protection actions are also RO knowledge.
Through discussion with licensee, CE allowed Qto remain. OK MAB
0210512008
There are also plausibility concerns with taking suction from VCT with
boron too low. This point is inconsequential due to the question not being
written at the SRO level.
Through discussion with licensee, CE allowed distractors to remain. OK
MAB 02/05/2008
MAB 02/05/2008
100 G2.4.49 N H 2 x lei"Shutdown Boards Energized"isnotanaction,itisa
100
statement offact.-Similar comment for"Safety Injection Actuated".
G2.4.49
S Q replaced.OKMAB 02/05/2008Page28 of29  
N
ES-401,Rev.9
H
WrittenExamReview
2
Worksheet Sequoyah 2008-301FormES-401-9
x
Q#KiA#BLLPsychometricFlawsContentFlaws
lei
U Comment M00StemCuesT/F1Non>1Non
"Shutdown Boards Energized" is not an action, it is a statement of fact. -
Partial MinSRO E Explanation
Similar comment for "Safety Injection Actuated".
N K D FocusCredCred KiAOnlySDistDist B/WNotSRO-only:Knowingwhetherthestatus of the reactorandturbineis
S
systems knowledge,whichisa required RO knowledge item.Knowingthatupona reactortripthat E-OisenteredisanRO
Qreplaced. OK MAB 02/05/2008
knowledgeitem.Thisisallthatis
Page 28 of29
neededtoarriveatthecorrectanswer.
 
Q revised/replacedtotest SRO-only knowledge.OKMAB 02/05/2008Page29 of29  
ES-401, Rev. 9
ES-403 Written Examination
Written Exam Review Worksheet
Grading Quality Checklist Form ES-403-1 Facility:Dateof Exam: OJJoO Exam Level: ROIl SRolro Initials Item Description
Sequoyah 2008-301
abc 1.Clean answer sheets copied before grading 1JK.NfIJ Ifff3 2.Answer key changes and question deletions justified?Jk.flJIA f}$and documented
Form ES-401-9
3.Applicants'
Q#
scores checked for addition errors sc(reviewers
KiA#
spot check>25%of examinations)
B
A 4.Gradingforall borderline
L
cases(80+/-2%overalland70or80,?1H.I'k m>as applicable,+/-4%onthe SRO-only)reviewed in detail5.All other failing examinations
L
checked to ensure that gradesrrfJ are iustified 6.Performance
PsychometricFlaws
on missed questions checked for trainingn'1O deficiencies
Content Flaws
and wording problems;evaluate validityof Questions missed by halformoreofthe
U
applicants
Comment
M
0
0
Stem
Cues
T/F
1 Non
>1 Non
Partial
Min
Q~
SRO
E
Explanation
N
K
D
Focus
Cred
Cred
KiA
Only
S
Dist
Dist
B/W
Not SRO-only: Knowing whether the status ofthe reactor and turbine is
systems knowledge, which is a required RO knowledge item. Knowing
that upon a reactor trip that E-Ois entered is an RO knowledge item. This
is all that is needed to arrive at the correct answer.
Qrevised/replaced to test SRO-only knowledge. OK MAB 02/05/2008
Page 29 of29
 
ES-403
Written Examination Grading
Quality Checklist
Form ES-403-1
Facility:
~E('OUD\\(MA
Date of Exam: OJJoO ~B
Exam Level: ROIl SRolro
Initials
Item Description
a
b
c
1.
Clean answer sheets copied before grading
1JK.
NfIJ
Ifff3
2.
Answer key changes and question deletions justified
?Jk.
flJIA
f}$
and documented
3.
Applicants' scores checked for addition errors
sc
~
~
(reviewers spot check> 25% of examinations)
A
4.
Grading for all borderline cases (80 +/-2% overall and 70 or 80,
?1H.
I'k
m>
as applicable, +/-4% on the SRO-only) reviewed in detail
/~
5.
All other failing examinations checked to ensure that grades
~
I~
rrfJ
are iustified
6.
Performance on missed questions checked for training
~
~
n'1O
deficiencies and wording problems; evaluate validity
.~
of Questions missed by half or more of the applicants
Printed Name/Signature
Printed Name/Signature
Date a.Grader
Date
z/I er!fJt b.Facility Reviewer(*)
a. Grader
N)A.N;/4 c.NRC Chief Examiner (*)M"",
~R.\\AN{) ~~1&sect;.UdtL
//2i/}&#xa3;tp
z/I er!fJt
d.NRC Supervisor
b. Facility Reviewer(*)
(*)/l.)jJ..UJJLJJ
N)A
T lVfDj,).AA/A/
.
/
N;/4
c. NRC Chief Examiner (*)
M"", A,B~I;3,1//2i/}&#xa3;tp
r:~I.l..ItJ.//J06'el
d. NRC Supervisor (*)
/l.)jJ..UJJLJJ T lVfDj,).AA/A/ /
!1iJjJAfJft~
ozl'l/ItJ?
ozl'l/ItJ?
r}{(*)Thefacility
r
reviewer's
} {
signatureisnot applicable
(*)
for
The facility reviewer's signature is not applicable for ex~ations graded by the NRC;
gradedbytheNRC;two independent
two independent NRC reviews are required.
NRC reviews are required.ES-403,Page6of6
ES-403, Page 6 of 6
ES*S01 Post-Examination
 
Check SheetFormES-S01-1
ES*S01
Post-Examination
Post-Examination Check Sheet
Check Sheet Facility: Sf::: (QU 0\{Vt IfDateof Examination:*.'(0<005 Task Description
Form ES-S01-1
Date Complete1.Facilitywrittenexamcommentsorgradedexamsreceived
Post-Examination Check Sheet
();;'/Itt!JDGandverifiedcomplete
Facility:
2.Facilitywrittenexamcommentsreviewedand
Sf::: (QU 0\\{VtIf
incorporated
Date of Examination: -:Yt~u.e.,*.'(
()J./1'-/J;)C'Cf C;;andNRC gradingcompleted,if
0<005
necessary 3.OperatingtestsgradedbyNRC
Task Description
examiners O?-)ILl)Jtr/?4.NRC chief examinerreviewofoperatingtestandwrittenexamgradingcompleted
Date Complete
5.Responsible
1.
supervisorreviewcompleted
Facility written exam comments or graded exams received
O;Z I;{d;)C)O C?6.Management(licensingofficial)reviewcompleted
();;'/Itt!JDG ~
o ,,:2/;;q I Jc;l1}7.Licenseanddeniallettersmailed
and verified complete
o 2);)
2.
8.Facilitynotifiedofresults
Facility written exam comments reviewed and incorporated
o;;;./J/?CJJ'?, jJ:i 9.Examinationreportissued(refertoNRCMC0612)os.':<oe J g'10.Referencematerialreturnedafterfinalresolutionofanyappeals
()J./1'-/J;)C'Cf C;;
Aliff ES-501,Page23of25
and NRC grading completed, if necessary
Tennessee Valley Authority, Post OfficeBox2000,Soddy-Daisy,Tennessee
3.
37384-2000
Operating tests graded by NRC examiners
Confidential
O?- ) ILl)Jtr/?
information
4.
submitted under10CFR2.390February13,200810CFR55.40
NRC chief examiner review of operating test and written exam
Dr.WilliamD.Travers Regional Administrator,RegionII U.S.Nuclear Regulatory
OJ!!41;}or/~
CommissionSamNunn Atlanta Federal Center61ForsythStreet,SW,Suite
grading completed
23T85 Atlanta,Georgia30323-8931
5.
Attention:Mr.M.T.WidmannInthe Matter of Tennessee Valley Authority (TVA)DocketNos.50-327
Responsible supervisor review completed
50-328 SEQUOYAHNUCLEARPLANT(SQN)-
O;Z I;{d;)C)O C?
REACTORANDSENIORREACTOR
6.
OPERATOR INITIAL EXAMINATIONS
Management (licensing official) review completed
-05000327/2008301
o,,:2/;;qIJc;l1} ~
AND 05000328/2008301
7.
In accordance
License and denial letters mailed
with Examination
o2);) JdtJ{)~
Standard(ES)501,"Initial
8.
Post-Examination
Facility notified of results
Activities,"ofNUREG-1021,"Operator Licensing ExaminationStandardsforPower
o;;;./~ J/?CJJ'?,
Reactors,"SONisprovidingthe
jJ:i
following information:
9.
written examination, examination
Examination report issued (refer to NRC MC 0612)
answerkey,ES401-8, examinationcoversheets,seatingchart, student answersheets,and
os .' :<oeJg'
student clarifying
10.
questions.
Reference material returned after final resolution of any appeals
In accordancewith10CFR55.49,"Integrity
Aliff
of ExaminationsandTests,"andNUREG-1021, appropriate
ES-501, Page 23 of 25
measureshavebeentakentoensureexamination
 
integrityandsecurity.The
Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000
Examination
Confidential information submitted
Security AgreementFormES-201-3willbeprovidedfollowingthe
under 10 CFR 2.390
post-examination
February 13, 2008
signatures.Becauseofthe
10 CFR 55.40
administratively
Dr. William D. Travers
confidentialnature,itisrequestedthatthe
Regional Administrator, Region II
informationcontainedinthe
U.S. Nuclear Regulatory Commission
enclosure be withheldfrompublic
Sam Nunn Atlanta Federal Center
disclosure
61 Forsyth Street, SW, Suite 23T85
in accordance
Atlanta, Georgia 30323-8931
with10CFR 2.390(a)(6).Thisletter
Attention: Mr. M. T. Widmann
containsnonew commitments.Ifyoushouldhaveany
In the Matter of
questions,pleasecontactmeat(423)843-7170.
Tennessee Valley Authority (TVA)
S.inc.e.relY,.J I. ff-------
Docket Nos.
J..D.SmithManager,SiteLicensingand
50-327
Industry Affairs EnclosuresPrintedonrecycledpaper
50-328
Tennessee Valley Authority,PostOfficeBox2000,Soddy-Daisy,Tennessee
SEQUOYAH NUCLEAR PLANT (SQN) - REACTOR AND SENIOR REACTOR
37384-2000
OPERATOR INITIAL EXAMINATIONS - 05000327/2008301 AND 05000328/2008301
December5,2007 Dr.William D.Travers Regional Administrator,RegionII U.S.Nuclear Regulatory
In accordance with Examination Standard (ES) 501, "Initial Post-Examination
CommissionSamNunn AtlantaFederalCenter61ForsythStreet,SW,Suite23T85
Activities," of NUREG-1021, "Operator Licensing Examination Standards for Power
Reactors," SON is providing the following information: written examination, examination
answer key, ES 401-8, examination cover sheets, seating chart, student answer
sheets, and student clarifying questions.
In accordance with 10 CFR 55.49, "Integrity of Examinations and Tests," and
NUREG-1021, appropriate measures have been taken to ensure examination integrity
and security. The Examination Security Agreement Form ES-201-3 will be provided
following the post-examination signatures.
Because of the administratively confidential nature, it is requested that the information
contained in the enclosure be withheld from public disclosure in accordance with
10 CFR 2.390(a)(6). This letter contains no new commitments. If you should have any
questions, please contact me at (423) 843-7170.
S.inc.e.relY,. JI
.. ~
_~~Cff-------
.~;:::;?'-
J
,~ .. '~ames D. Smith
Manager, Site Licensing and
Industry Affairs
Enclosures
Printed on recycled paper
 
Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000
December 5, 2007
Dr. William D. Travers
Regional Administrator, Region II
U.S. Nuclear Regulatory Commission
Sam Nunn Atlanta Federal Center
61 Forsyth Street, SW, Suite 23T85
Atlanta, Georgia 30323-8931
Atlanta, Georgia 30323-8931
Attention:Mr.M.T.WidmannInthe Matter of Tennessee Valley Authority (TVA)DocketNos.50-327
Attention: Mr. M. T. Widmann
50-328 ((SEQUOYAH NUCLEARPLANT(SQN)-
In the Matter of
REACTORANDSENIORREACTOR
Tennessee Valley Authority (TVA)
OPERATOR INITIAL EXAMINATIONS
Docket Nos.
-05000327/2008301
50-327
AND 05000328/2008301
50-328
This letter transmitstherequested
(
information
(
identifiedinNRC'sletterto
SEQUOYAH NUCLEAR PLANT (SQN) - REACTOR AND SENIOR REACTOR
William R.CampbelldatedAugust
OPERATOR INITIAL EXAMINATIONS - 05000327/2008301 AND 05000328/2008301
3,2007,forthe examinationstobe administrated
This letter transmits the requested information identified in NRC's letter to
theweeksof January28,2008,and
William R. Campbell dated August 3,2007, for the examinations to be administrated the
February4,2008.Thereareno
weeks of January 28, 2008, and February 4, 2008.
commitmentscontainedinthis
There are no commitments contained in this submittal. In accordance with 10 CFR 55.49
submittal.
and NUREG 1021, "Operator Licensing Examination Standards for Power Reactors,"
In accordancewith10CFR55.49andNUREG1021,"Operator Licensing Examination
appropriate measures have been taken to ensure examination integrity and security.
StandardsforPowerReactors," appropriate
Accordingly, it is requested that this letter and the enclosed documents be withheld from
measureshavebeentakentoensure
public disclosure until the examinations are completed.
examination
TVA's principal contact regarding the license examinations is Tom Jones, SON Operations
integrityandsecurity.
Training. Should you require additional information regarding this matter, please contact
Accordingly,itisrequestedthatthisletterandthe
Mr. Jones at (423) 843-4206 or contact me at (423) 843-7170.
enclosed documentsbewithheldfrom
Sincerely,
public disclosureuntilthe examinations
w.?~
are completed.TVA'sprincipal
James D. Smith
contactregardingthelicense
Manager, Site Licensing and
examinationsisTomJones,SONOperationsTraining.Shouldyourequireadditional
Industry Affairs
informationregardingthismatter,pleasecontactMr.Jonesat(423)843-4206or
Enclosure
contactmeat(423)843-7170.
Printed on recycled paper
Sincerely,JamesD.SmithManager,Site
 
Licensing and Industry Affairs EnclosurePrintedonrecycledpaper
(
((U.S.Nuclear
(
Regulatory
U.S. Nuclear Regulatory Commission
CommissionPage2 December5,2007 JWP:KTS cc: L.E.Nicholson,BR4X-CT.D.Wallace,STC2H-SQNB.A.Wetzel,BR4X-CEDMS,WTCA-KTheinformationcontainedwithinthis
Page 2
documentisthe Propertyofthe TennesseeValleyAuthorityandhasbeen
December 5, 2007
determinedtobesensitive.Any
JWP:KTS
furtherdistributionofitscontentswillbeonaneedtoknowbasisonlyasdeterminedbytheoriginatorofthedocumentortherecipient.
cc:
L. E. Nicholson, BR 4X-C
T. D. Wallace, STC 2H-SQN
B. A. Wetzel, BR 4X-C
EDMS, WT CA-K
The information contained within this document is the Property of the Tennessee
Valley Authority and has been determined to be sensitive. Any further distribution of
its contents will be on a need to know basis only as determined by the originator of
the document or the recipient.
SENSITIVE INFORMATION
SENSITIVE INFORMATION
I: License\Operator
I:License\\Operator license\\2007\\Requested information IR2008301
license\2007\Requested
 
information
(
IR2008301
(
((ENCLOSURE TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)UNITS1AND2
ENCLOSURE
OPERATING EXAMINATIONS
TENNESSEE VALLEY AUTHORITY
FOR REACTOR OPERATOR (RO)ANDSENIOR REACTOR OPERATOR (SRO)CANDIDATES
SEQUOYAH NUCLEAR PLANT (SQN)
Written Examination-ROandSRO Portions Including Student Reference Material Question Development
UNITS 1 AND 2
Reference Material forROandSRO Written Examinations
OPERATING EXAMINATIONS FOR REACTOR OPERATOR (RO)
Job Performance
AND SENIOR REACTOR OPERATOR (SRO) CANDIDATES
Measures forROandSRO examinations
Written Examination - RO and SRO Portions Including Student Reference Material
Four Simulator examinationsES-201-3-Examination
Question Development Reference Material for RO and SRO Written Examinations
Security AgreementES-301-2-Control Room/In-Plant
Job Performance Measures for RO and SRO examinations
Systems OutlineES-301-3-Operating Test Quality Checklist ES-301-4-Simulator Scenario Quality ChecklistES-301-5-Transient and Event ChecklistES-301-6-Competencies
Four Simulator examinations
ChecklistES-401-6-Written Examination
ES-201-3 - Examination Security Agreement
Quality Checklist  
ES-301-2 - Control Room/In-Plant Systems Outline
(Tennessee Valley Authority,PostOfficeBox2000,Soddy-Daisy,Tennessee
ES-301-3 - Operating Test Quality Checklist
37384-2000
ES-301-4 - Simulator Scenario Quality Checklist
October23,2007Dr.WilliamD.Travers
ES-301-5 - Transient and Event Checklist
Regional Administrator,RegionIIU.S.Nuclear
ES-301-6 - Competencies Checklist
Regulatory
ES-401-6 - Written Examination Quality Checklist
CommissionSamNunnAtlantaFederalCenter61ForsythStreet,SW,Suite23T85Atlanta,Georgia30323-8931
 
Attention:Mr.M.T.WidmannIntheMatterof
(
Tennessee Valley AuthorityDocketNos.50-327
Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000
50-328 ((SEQUOYAH NUCLEARPLANT-REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS
October 23, 2007
-05000327/2008301
Dr. William D. Travers
AND 05000328/2008301AsrequestedbyNRCletterto
Regional Administrator, Region II
TVAdatedAugust
U.S. Nuclear Regulatory Commission
3,2007,thislettertransmitsthe
Sam Nunn Atlanta Federal Center
examination
61 Forsyth Street, SW, Suite 23T85
outlines identifiedinNRC'slettertoWilliam
Atlanta, Georgia 30323-8931
R.CampbelldatedAugust3,2007,forthe
Attention: Mr. M. T. Widmann
examinationstobe administratedtheweeksof
In the Matter of
January28,2008andFebruary4,2008.Thereareno
Tennessee Valley Authority
commitmentscontainedinthis
Docket Nos.
submittal.
50-327
In accordancewith10CFR55.49andNUREG1021,"Operator Licensing ExaminationStandardsforPowerReactors," appropriate
50-328
measureshavebeentakentoensure
(
examinationintegrityandsecurity.Accordingly,itisrequestedthatthisletterandtheenclosed
(
documentsbewithheldfrom
SEQUOYAH NUCLEAR PLANT - REACTOR AND SENIOR REACTOR OPERATOR
public disclosureuntilthe examinations
INITIAL EXAMINATIONS - 05000327/2008301 AND 05000328/2008301
are completed.
As requested by NRC letter to TVA dated August 3,2007, this letter transmits the
Please direct questions concerningthisissuetomeat(423)843-7170.GlennW.MorrisManager,SiteLicensingand
examination outlines identified in NRC's letter to William R. Campbell dated August 3,
Industry Affairs EnclosurePrintedonrecycledpaper
2007, for the examinations to be administrated the weeks of January 28, 2008 and
(ENCLOSURE TENNESSEE VALLEY AUTHORITYSEQUOYAHNUCLEARPLANT(SQN)UNITS1AND2Thefollowingareincludedinthis
February 4, 2008.
enclosure:
There are no commitments contained in this submittal. In accordance with 10 CFR 55.49
License Examination
and NUREG 1021, "Operator Licensing Examination Standards for Power Reactors,"
Outlines: ES-201-2 Examination
appropriate measures have been taken to ensure examination integrity and security.
Outline Quality Checklist ES-201-3 Examination
Accordingly, it is requested that this letter and the enclosed documents be withheld from
Security Agreement ES-301-1 AdministrativeTopicsJPM OutlinesforROandSROexamsES-301-2Control
public disclosure until the examinations are completed.
Room/In-Plant
Please direct questions concerning this issue to me at (423) 843-7170.
SystemsJPMOutlinesforROandSROexams
~rzJ.~
ES-301-5 TransientandEvent Checklist ES-D-1 SimulatorScenarioOutlinesfor4 scenariosES-401-2and3
Glenn W. Morris
Written Exam OutlinesforROandSROexamsES-401-4RecordofRejectedKlAsforROandSROexams
Manager, Site Licensing and
Written Exam development
Industry Affairs
methodology
Enclosure
statement
Printed on recycled paper
Tennessee Valley Authority,PostOfficeBox2000,Soddy-Daisy,Tennessee
 
37384-2000
(
August 15,2007Dr.WilliamD.
ENCLOSURE
Travers Regional Administrator,RegionII U.S.Nuclear Regulatory
TENNESSEE VALLEY AUTHORITY
CommissionSamNunn AtlantaFederalCenter61ForsythStreet,SW,Suite23T85Atlanta,Georgia30323-8931Attention:Mr.
SEQUOYAH NUCLEAR PLANT (SQN)
R.C.HaagInthe Matter of Tennessee Valley AuthorityDocketNos.50-327
UNITS 1 AND 2
50-328 (SEQUOYAH NUCLEARPLANT-REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS
The following are included in this enclosure:
-05000327/2008301
License Examination Outlines:
AND 05000328/2008301AsrequestedbyMarkBatesofyourstaff,this
ES-201-2 Examination Outline Quality Checklist
letter transmitsthewrittenexamination
ES-201-3 Examination Security Agreement
outlines identifiedinNRC'slettertoWilliam
ES-301-1 Administrative Topics JPM Outlines for RO and SRO exams
R.CampbelldatedAugust3,2007,forthe
ES-301-2 Control Room/In-Plant Systems JPM Outlines for RO and SRO exams
examinationstobe administratedtheweekof January28,2008.Duetothe administrativelyconfidentialnatureofthe
ES-301-5 Transient and Event Checklist
enclosure,itisrequestedthatthe
ES-D-1 Simulator Scenario Outlines for 4 scenarios
information
ES-401-2 and 3 Written Exam Outlines for RO and SRO exams
containedinthe enclosurebewithheldfrompublic
ES-401-4 Record of Rejected KlAs for RO and SRO exams
disclosureuntilafterthe
Written Exam development methodology statement
examinations
 
are complete.Please direct questionsconcerningthisissuetomeat(423)843-7170.GlennW.MorrisManager,Site
Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000
Licensing and Industry Affairs EnclosurePrintedonrecycledpaper
August 15,2007
(u.s.Nuclear Regulatory
Dr. William D. Travers
CommissionPage2 August15,2007 JWP:KTS cc: R.H.Bryan,BR4X-CT.D.Wallace,STC2H-SQN
Regional Administrator, Region II
EDMS, WTC A-K The information
U.S. Nuclear Regulatory Commission
contained within this documentisthe Property of the Tennessee Valley Authorityandhasbeen
Sam Nunn Atlanta Federal Center
determinedtobe sensitive.
61 Forsyth Street, SW, Suite 23T85
Any further distribution
Atlanta, Georgia 30323-8931
of its contents willbeona need to know basis only as determinedbythe originator
Attention:
of the document or the recipient.
Mr. R. C. Haag
In the Matter of
Tennessee Valley Authority
Docket Nos.
50-327
50-328
(
SEQUOYAH NUCLEAR PLANT - REACTOR AND SENIOR REACTOR OPERATOR
INITIAL EXAMINATIONS - 05000327/2008301 AND 05000328/2008301
As requested by Mark Bates of your staff, this letter transmits the written examination
outlines identified in NRC's letter to William R. Campbell dated August 3, 2007, for the
examinations to be administrated the week of January 28, 2008.
Due to the administratively confidential nature of the enclosure, it is requested that the
information contained in the enclosure be withheld from public disclosure until after the
examinations are complete.
Please direct questions concerning this issue to me at (423) 843-7170.
~ZuN.~
Glenn W. Morris
Manager, Site Licensing and
Industry Affairs
Enclosure
Printed on recycled paper
 
(
u.s. Nuclear Regulatory Commission
Page 2
August 15, 2007
JWP:KTS
cc:
R. H. Bryan, BR 4X-C
T. D. Wallace, STC 2H-SQN
EDMS, WTC A-K
The information contained within this document is the Property of the Tennessee
Valley Authority and has been determined to be sensitive. Any further distribution of
its contents will be on a need to know basis only as determined by the originator of
the document or the recipient.
SENSITIVE INFORMATION
SENSITIVE INFORMATION
I: License\Operator
I:License\\Operator license\\2007\\Exam outline IR2008301
license\2007\ExamoutlineIR2008301
 
ENCLOSURE TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)UNITS1AND2
ENCLOSURE
LICENSE WRITTEN EXAMINATION
TENNESSEE VALLEY AUTHORITY
OUTLINES
SEQUOYAH NUCLEAR PLANT (SQN)
UNITS 1 AND 2
LICENSE WRITTEN EXAMINATION OUTLINES
}}
}}

Latest revision as of 17:44, 14 January 2025

NRC Examination Report Nos. 05000327-08-301 and 05000328-08-301
ML080720485
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/31/2008
From: Widmann M
Division of Reactor Safety II
To:
References
Download: ML080720485 (59)


See also: IR 05000327/2008301

Text

1.

2.

3.

4.

5.

6.

7.

ADMINISTRATIVE DOCUMENTS

(Yellow Paper)

E

P

.

C

ES-201-1/'

xam

reparation

hecklist

.

/

Exam Outline Quality Checklist. J:>:u=:

ES-201-2

Exam Security Agreement(s)

ES-201-3./

Administrative Topics Outline (Final)

ES-301-1 /

C~ntrol Room Systems & Facility Walk-through Test Outline

./

(Final)

ES-301-2

/

Operating Test Quality Check Sheet

ES-301-3

J

Simulator Scenario Quality Check Sheet

ES-301-4

8.

Transient and Event Checklist

.

9.

Competencies Checklist

.

10.

Written Exam Quality Check Sheet

.

I

ES-301-5

/

ES-301-6

.

/

ES-401-6

11.

Written Exam Review Worksheet

ES-401-9

12.

Written Exam Grading Quality Checklist

ES-403-1 ./

13.

Post-Exam Check Sheet

ES-501-1/'

14.

Facility Submittal Letter.s ( 0

SE{}uoyAH

oZO~8-JL)/

[]

~.

ES*201

Examination Preparation Checklist

Form ES*201*1

Facility:

<: lVlAO;! rW

Date of Examination: -:r4-N. &'OClC~

Developed by: Written - Facility ~NRC 0

II

Operating - Facility MNRC 0

Target

Chief

Date"

Task Description (Reference)

Examiner's

Initials

-180

1.

Examination administration date confirmed (C.1.a; C.2.a and b)

IJifS

-120

2.

NRC examiners and facility contact assigned (C.1.d; C.2.e)

r~

-120

3.

Facility contact briefed on security and other requirements (C.2.c)

r0kP

-120

4.

Corporate notification letter sent (C.2.d)

y11f>

[-90]

[5.

Reference material due (C.1.e; C.3.c; Attachment 3)]

!Y~

{-75}

6.

Integrated examination outline(s)due, including Forms ES-201-2, ES-201-3,

ES-301-1, ES-301-2, ES-301-5, ES-O-1's, ES-401-1/2, ES-401-3, and

~

ES-401-4, as applicable (C.1.e and f; C.3.d)

{-70}

{7.

Examination outline(s) reviewed by NRC and feedback provided to facility

tms

licensee (C.2.h; C.3.e)}

{-45}

8.

Proposed examinations (including written, walk-through JPMs, and

scenarios, as applicable), supporting documentation (including Forms

m$>

ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any Form

ES-201-3 updates), and reference materials due (C.1.e, f, g and h; C.3.d)

-30

9.

Preliminary license applications (NRC Form 398's) due (C.1.1; C.2.g;

I~

ES-202)

-14

10.

Final license applications due and Form ES-201-4 prepared (C.1.1; C.2.i;

/I~

ES-202)

-14

11.

Examination approved by NRC supervisor for facility licensee review

}~

(C.2.h; C.3.f)

-14

12.

Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g)

'rn!b

-7

13.

Writt~n exam~ons and oper~tests approved by NRC supervisor

(C.2.1; C.3.h)

-7

14.

Final applications reviewed; 1 or 2 (if >10) applications audited to confirm

flI4IP

qualifications / eligibility; and examination approval and waiver letters sent

(C.2.i; Attachment 5; ES-202, C.2.e; ES-204) ],w-s;..v--et'::,-,,) :2 G..K!~"""'-l.£v;....J

-7

15.

Proctoring/written exam administration guidelines reviewed

mrs

with facility licensee (C.3.k)

-7

16. Approved scenarios, job performance measures, and questions

~

distributed to NRC examiners (C.3.i)

  • Target dates are generally based on facility-prepared examinations and are keyed to the examination date

identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-

case basis in coordination with the facility licensee.

[Applies only] {Does not apply} to examinations prepared by the NRC.

ES-201, Page 25 of 28

ES*201

Examination Outline Quality Checklist

Form ES*201*2

c#

b'

a

~1ZJrwP

~7ZJIMP

-~ 'llJ r#b

Initials

Date of Examination: 1/;)..00?:j'

Task Description

d.

Assess whether the justifications for deselected or rejected KIA statements are appropriate.

a.

Verify that the outline(s) fit(s) the appropriate model, in accordance with ESA01.

f--.--*-*--------------------------------+--t-'-~+_~__11

b.

Assess whether the outline was systematically and randomly prepared in accordance with

--2..,,:cOon 0.1 of ES-401 ar:.d whether all KIA cateqories are appropriately sampled.

c.

Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.

Item

I----+-*--------------------------------t-::..-j-..:;:--t-~I

1.

W

R

I

T

T

E

N

c.

To the extent possible, assess whether the outline(s) conform(s) with the qualitative

and quantitative criteria specified on Form ES-301-4 and described in Appendix D.

a.

Using Form E$-301-5, verify that the proposed scenario sets cover the required number

of normal evolutions, instrument and component failures, technical specifications,

and major transients.

f--*-------------'-----------------------;---;f-<--t---il

b.

Assess whether there are enough scenario sets (and spares) to test the projected number

and mix of applicants in accordance with the expected crew composition and rotation schedule

without compromising exam integrity, and ensure that each applicant can be tested using

at least one new or significantly modified scenario, that no scenarios are duplicated

from the applicants' audit test(s), and that scenarios will not be repeated on subsequent davs.

2.

I

M

U

L

A

To

R

s

Ir----I-*--*-~----------------------------_t_-+_-+--_il

3

W

I

T

a.

Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:

(1)

the outlir&(s) contain(s) the required number of control room and in-plant tasks

distributed among the safety functions as specified on the form ./'

(2)

task repetition from the last two NRC examinations is within the limits specified on the fonrn ......

(3)

no tasks are duplicated from the applicants' audit test(s)./

1~."11

J fY\\tS

(4)

the number of flew or modified tasks meets or exceeds the minimums specified on the form ,/

.

/!II./ I

(5)

the number of alternate path, low-power, emergency, and RCA tasks meet the criteria.>

on the form.

-;~tZ..

Iv~

15 '1?J ifVIfJ

i1'~ 1lJ 1~

f0~'iv~

-j-:) 7lJ \\\\rR>

Assess whether the 10 CFR55,41 143 and 55,45 sampling is appropriate.

Assess whether the exam fits the appropriate job level (RO or SRO).

e.

Check the entire exam for balance of coverage.

d.

Check for duplication and overlap among exam sections.

b.

1-*-*-----------------....:..--:..-..:....:....:....:..-----------j-!:~+"u::.'9-'~-i1

c.

Ensure that KIA importance ratings (except for plant-specific priorities) are at least 2.5.

G

E

N

E

R

p.,

L

b.

Verify that the administrative outline meets the criteria specified on Form ES-301-1:

(1)

the tasks are distributed among the topics as specified on the form ,./

(2)

at least one task is new or significantly modified ,./

(3)

no more than one task is repeated from the last two NRC licensing examinations ./'

c.

Determine if there are enough different outlines to test the projected number and mix

0/'

,..--.-

of applicants and ensure that no items are duplicated on subsequent days.

4.

R.

Assess whether plant-specific priorities (including PRA and IPE insights) are covered

in the appropriate exam sections.

Note:

Date

j 1/7(t/'8

I JI7/~

Q2 /0.4bM'-,

t'-7{l5'I",

a. Author

b. Facility Reviewer (')

c. NRC Chief Examiner (if)

d. NRC Supervisor

IJA.II'Fn..l./~\\nll.Uf..:,/

~

II-'

--Ifll.<::~~.,/Y 'L

  1. Independent NRC reviewer initial items in Colbmrr"C"; ctlref examiner concurrence required.
j,; >:>>.:,c,;c 'z... .,f<:'., ... ,'

",.; 11;;',;!:>;['

);V,':".

E8-201, Page 26 of 28

ES-201

Examination Outline Quality Checklist

DIll

7

Form ES-201-2

(

(

Facility:

Date of Examination:

Initials

Item

Task Description

b*

c#

a

1.

a.

Verify that the outline(s) fills) the appropriate model, in accordance with ES-401.

~ V

~

W

./

R

b.

Assess whether the outline was systematically and randomly prepared in accordance with

-IS .#J.... '01{S

I

Section 0.1 of ES-401 and whether all KiA cateqories are appropriately sampled.

T

Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.

--1) .,~ *

T

c.

E

d.

Assess whether the justifications for deselected or rejected KiA statements are appropriate.

~ I-ra)

N

NJ6

2.

a.

Using Form ES-301-5, verify that the proposed scenario sets cover the required number

~ 1Y

of normal evolutions, instrument and component failures, technical specifications,

M$

S

and major transients.

I

M

b.

Assess whether there are enough scenario sets (and spares) to test the projected number

U

and mix of applicants in accordance with the expected crew composition and rotation schedule ~ ~ r1£

L

without compromising exam integrity, and ensure that each applicant can be tested using

A

at least one new or significantly modified scenario, that no scenarios are duplicated

T

from the applicants' audit testis). and that scenarios will notbe repeated on subsequent days.

0

c.

To the extent possible, assess whether the outline(s) conform(s) with the qualitative

p

R

and quantitative criteria specified on Form ES-301-4 and described in AppendiX2Ctt -tlcn

Irv ~

-

30

'

u.h

.~ w.A

,'U

wl-\\'

. L ioCe\\15E'e

YIlt!> ~

~ *td

t:S-

i-l.IWa.S""Y\\Df- s

~\\'

Lv. u..

{)IIVII~

W(V.[\\SI".fL "i-iAS

~,IA

~'1'v)k-\\t: .

3.

a.

Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:

(1 )

the outline(s) contain(s) the required number of control room and in-plant tasks

W

distributed among the safety functions as specified on the form

r<<V

/

(2)

task repetition from the last two NRC examinations is within the limits specified on the form

76 rr

T

(3)

no tasks are duplicated from the applicants' audit testis)

(4)

the number of new or modified tasks meets or exceeds the minimums specified on the form

'*

(5)

the number of altemate path, low-power, emergency, and RCA tasks meet the criteria

on the form.

b.

Verify that the administrative outline meets the criteria specified on Form ES-301-1:

(1 )

the tasks are distributed among the topics as specified on the form

7!J ~

(ff6

(2)

at least one task is new or significantly modified

(3)

no more than one task is repeated from the last two NRC licensinq examinations

c.

Determine if there are enough different outlines to test the projected number and mix

15,iJ ~

of applicants and ensure that no items are duplicated on subsequent days.

4.

a.

Assess whether plant-specific priorities (including PRA and IPE insights) are covered

76 ~ tI1t

in the appropriate exam sections.

G

b.

Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate.

.~ ~ tWP

E

N

c.

Ensure that KiA importance ratings (except for plant-specific priorities) are at least 2.5.

76 .<lJ ~

E

d.

Check for duplication and overlap among exam sections.

76 .<tJ ~

R

A

e.

Check the entire exam for balance of coverage.

76 4r/ \\'\\Xb

L

Assess whether the exam fits the appropriate job level (RO or SRO).

o>> ~v..I 'f\\\\t5

f.

7"1omitS -:s:::

Printed Na

...' JO

ioltcPJih

a. Author

O"V'" .:>

~

~~

b. Facility Reviewer (*)

TJJ& I""" "'~

0

cJA If.."

e,

/-- Y

"' r. trJ/

jV//? (07

c. NRC Chief Examiner (#)

M.AI\\~ A- 'B4-r£5 I ~ ~ L/ J O<.:t.':is

"'/fltlo7

d. NRC Supervisor

J IIUI'N 1.(1:\\\\IfT)dlHIi-! / tfb'

1

{I/N!lJ1

(

-,

r

....

Note:

  1. Independent NRC reviewer initial items in Coiwr;n "c"; chief examiner concurrence required.
  • ()(C~'h\\trl.s

CU'- i1cted

d'Y1

L1'Mf\\'\\eJ."\\1- 'S"'~-\\-.

ES-201, Page 25 of 27

ES-201

Examination Security Agreement

Form ES-201-3

1.

Pre-Examination

J/:< elog ike!

I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of ,7/?I/o(f

as of the

date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized

by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be

administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and

authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or

provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility

licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an

enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or

suggestions that examination security may have been compromised.

2.

Post-Examination

To the best of my kno~ledg2~1

id not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered

during the week(s) of !h9 -

i'~ O:9From the date that I entered into this security agreement until the completion of examination administration, I did not

instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically

noted below and authorized by the NRC.

.

JOB TITLE / RESPONSIBILITY

szl14E

DP~Tlo~

ES-201, Page 26 of 27

ES-201

Examination Security Agreement

Form ES-201-3

1.

Pre-Examination

/

/

I

I

'2.~{ o?f t"~v

I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of ;2./ 'lJ(0'if as of the

date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized

by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be

administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and

authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or

provide direct or indirect feedback).

Furthermore, I am aware of the physical security measures and requirements (as documented in the facility

licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an

enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or

suggestions that examination security may have been compromised.

2.

Post-Examination

To the best of my knowled~e I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered

during the week(s) of ~~ - Y'f'OG' From the date that I entered into this security agreement until the completion of examination administration, I did not

instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically

noted below and authorized by the NRC.

JOB TITLE / RESPONSIBILITY

kD

Ifo

~ogo

/20

ES-201, Page 26 of 27

DATE

SC-&>>fY#/

l:-£JOf"

ES~201

Examination See!~tl-A-8-ree-m-l!-n-t-F-crm-------------f-o-nn""(~s-2ft1*3

Pre-Exarnin:atfon

)!;z.r;/t;?

~wV

I ackrlo.edge that Ehave acquirHdspecialized knowledgeabout the-tIRe Ijc;ensing examillations t.cheduled for the week(s) of ?j~10 "l

as of the

date o.fmy signaturtr. I agree that I will no'! knowin{ly divulge any infurmation about these examinaoons to aly per-mns who haw not been authnrized

by the NRC chief examinet'". I urtde:rsland t'lat I ern £101to instruc;l. evaluate, or provide performeoce feedback 10thoseapj;li[;Clnls scheduled to be

admil'iisteled these licensing examinatlO1l$. from this dat.eunlil c:omplel:ion of examination administniliorl, except as specificalit noted oolow and

aultlorized byttle NRC (e.g., acting as a simt.Jator boot!

h 'Opef~or or eemmurlicatOl' is aooeptableif 111 iii indi\\lidLSlI does not select the fJainingCOnient or

llfovide direct a'" indirec1 feedback). Furthemllre. I aIrI aware of !tie physical security measures aJ1d rE!q\\lirernel11s (as documented fl the facjlil~

lit:erJsee's procecb'es) and understand thai vio!a1ionof the conditions of thks agreem enJ. mayrestflt in carnl!Dalion (If the elo:aminatioos and/or an

enfDlcement action agains1 me or lhefaGilitv licensee. Iw. immEdialelyreport to facility managemeritOf tire NRC chief examio@r 8rIY indications Dr

suggesfons that eKaminal~on o.ewrity may ha\\19 been compromised.

1.

2_

Post-E nmination

To tf1ebest of my lfficMtIedge. td id not divLIIgeto any un<llJthorlzed persons any irforrnatiQn ooncemiog the NRC Ii-cerlsing exarnillaticns admTiistered

dlJri1g the week(s) of

. From the dale that I entered into this sewlil1' agreemeflt unlil ttle compleliort of e:xami1ation admi1istratioo. rtid oot

instrudl. evaluale, or provide pelfurmance feedback m thase applicants who were administered these licensi"lg elC3minations, ext:ept as spef;ifically

noted beJow:and authorized by the NRC

.

ES-201, Page 26 of27



JOB rrns I RESPONSIBILITY

fS. \\J !ef'JPR

PRlmED!'WAE~

SIGNAT~

DJ}T~. ~."

T

{

VA E

TE

1:~s8'H M.$G..*Jb(

.f-~-Fli../L-:o,..t

=,-,_"L-J-=;;:..__~

__

Yf_

  • _~iLE:.!LQ.7~~Z* Jl oK

2.

---l.[~>--*-----

~_"

_

3.

.

--'-

_

4.

.

_

5.

.

_

6.

_

7.

_

a.

9.

--:.~

_

10.,

_

11.,

.

_

12.,

~__

13,,

_

14.

15_,-='


NOTES:

C

0-

ES-301

Administrative Topics Outline

Form ES-301-1

(

(

Facility:

Sequoyah 1 & 2

Ro9

Date of Examination:

1/2008

Examination Level (circle one):

Operating Test Number:

NRC

Administrative Topic

Type Code*

Describe activity to be performed

(see Note)

Conduct of Operations

2.1.1

Knowledge of conduct of operations requirements. (CFR:

N,R

41.10/45.13)

3.7/3.8

Determine license status

Active / Inactive

Conduct of Operations

2.1.33

Ability to recognize indications for system operating

parameters which are entry-level conditions for technical

D,S

specifications. (CFR: 43.2 /43.3/45.3)

3.4 / 4.0

Perform Shift Log SI-2 SG Level Instrumentation (JPM

176)

2.2.18

Knowledge of the process for managing maintenance

Equipment Control

activities during shutdown operations.

N,R

(CFR: 43.5/45.13)

3.6

Containment Closure Time

Radiation Control

2.3.10

Ability to perform procedures to reduce excessive levels of

radiation and guard against personnel exposure. (CFR:

D,R

43.4 / 45.10)

2.9/3.3

Survey Map (JPM 166)

Emergency Plan

2.4.41

Knowledge of the emergency action level thresholds and

classifications.(CFR: 43.5/45.11)

4.1

D,S

Classify the REP Degraded Core with Possible Loss of

Coolable Geometry and Likely Cntmt Failure (JPM 109)

NOTE:

All items (5 total are required for SROs.

RO applicants require only 4 items unless they are retaking

only the administrative topics, when 5 are required.

  • Type Codes & Criteria:

(C)ontrol room

Class(R)oom

(D)irect from bank (:S: 3 for ROs; :s: for SROs & RO retakes)

(N)ew or (M)odified from bank (> 1)

(P)revious 2 exams (:S: 1; randomly selected)

(S)imulator

NUREG-1021

Revision 9

ES-301

Administrative Topics Outline

SRO Admin JPM Summary

Form ES-301-1

(

A1a

The applicant will evaluate the status of licensed operators work history to determine if license is active or

inactive.

A1b

The applicant will be required to recognize a required Technical Specification entry while completing and a

portion of the daily shift surveillance instruction.

A2

The applicant will evaluate a request to open a containment penetration during a refuel outage and determine

the requirements.

A3

The applicant will use a survey map to determine anti-contamination clothing requirements, stay time, and

radiation levels in area.

A4

The applicant will evaluate conditions for entry into the E-Plan, determine the proper classification, protection

action recommendation, and make required notifications.

NUREG-1021

Revision 9

ES-301

Control Room/In-Plant Systems Outline

Form ES-301-2

(

Facility:

Sequoyah 1 & 2

Date of Examination:

1/2008

-

Exam Level (circle one):

R~SRO~I SRO (U)

Operating Test No.:

NRC

Control Room Systems@ (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U, including 1 ESF)

System I JPM Title

Type Code*

Safety

Function

a.

W/E14 High Containment Pressure

(EA-1.1 )

3.7 I 3.7

D,A,S

5

Respond to High Containment Pressure (JPM 057AP1)

b.

003 Reactor Coolant Pump System

(A2.01 )

3.5 I 3.9

N,L,S

4P

Respond to a #1 RCP Seal Failure

c.

001 Control Rod Drive System

(A3.05)

3.5 I 3.5

M,A,L,S

1

Shutdown Bank Withdrawal

d.

004 Chemical and Volume Control System (A4.06)

3.6 13.1

N,L,S

2

Fill and Vent Excess Letdown

e.

038 Steam Generator Tube Rupture (EA1.32 )

4.6 14.7

D,A,S

3

SG tube rupture with MSIV fails to Close (JPM 075AP)

f.

015 Nuclear Instrumentation System (A1.01) 3.5 I 3.8

D,A,S

7

Calibrate Power Range Nuclear Instrumentation (JPM 22-AP2)

g.

064 Emergency Diesel Generator (ED/G) System (A4.06)

3.9 I 3.9

M,D,S

6

Shutdown the Diesel Generator (1A-A and 1B-B) (JPM 046-1)

h.

In-Plant Systems@ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)

i.

061 Auxiliary I Emergency Feedwater System

(A2.04)

3.4 I 3.8

D,A,E,R

4S

Operate the TO AFW Pump Locally (JPM 74-2AP)

j.

004 Chemical and Volume Control System

(A2.25)

3.8 14.3

D,R

1

Uncontrolled Dilution Flow Path Isolation (O-SI-OPS 063-214.0)) (JPM 40-2)

k.

062 AC Electrical Distribution

(A2.10)

3.0 13.3

D,A

6

Transfer 480v SO Board 2A1-A from Normal to Alternate (JPM 061AP2)

@

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions;

all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap

those tested in the control room.

NUREG-1021

Revision 9

ES-301

Control Room/In-Plant Systems Outline

Form ES-301-2

\\,

~

  • Type Codes

Criteria for RO / SRQl-1 j SRO-U

" --

(A)lternate path

4-6/4-0'/2-3

iJJ

(C)ontrol room

ff!:<;47

(D)irect from bank

'5,9 /

(E)mergency or abnormal in-plant

1 /

1"1:?: 1 \\

(L)ow-Power / Shutdown

<:: 1 /

11:'?:1 .:>

(N)ew or (M)odified from bank including 1(A)

2/'?2"1'2:1-1

(P)revious 2 exams

3/

3/

2 (randomly selected) 0

(R)CA

1 /

1/<:: 1 .......-

(S)imulator

JPM Summary

JPMA

JPM B

JPM C

JPM D

JPM E

(

'-

JPM F

JPM G

JPM I

RHR spray will be established in accordance with FR-Z.1, High Containment Pressure. This is a Bank

Alternate Path JPM.

An RCP seal failure will be diagnosed and the Abnormal Operating Instruction used to remove the pump

from service. This is a new low power/shutdown JPM

A failure of the step counter will occur during the withdrawal of Shutdown Rods requiring a reactor trip.

This is a new alternate path low power/shutdown JPM.

Excess letdown system will be filled and vented from the control room using the system operating

instruction. This is a new low power/shutdown JPM.

A Main Steam Isolation valve will fail to close during the isolation of steam side of a ruptured steam

generator will be isolated.. This is a Bank Alternate Path JPM.

Power Range nuclear instruments will be adjusted in accordance with the surveillance instruction O-SI-OPS-

092-078.0. This is a Bank Alternate Path JPM.

Unit 1 Diesel Generators will be shutdown per EA-82-1. This is a Bank modified JPM.

Plant JPM -The trip and throttle valve will not open electrically while TDAFW pump is being placed in

service locally. This is an Alternate path Bank JPM using emergency abnormal procedure performed inside

the RCA.

JPM J

Dilution flow path will be isolated using O-SI-OPS 062-214.0.

This is a Bank JPM performed inside the

RCA using an Appendix contains in a surveillance instruction.

JPM K

Plant JPM - A breaker will fail to operate while a transfer of a 480v Shutdown Board is being attempted.

This is a Bank Alternate Path JPM.

NUREG-1021

Revision 9

ES-301

Control Room/In-Plant Systems Outline

Form ES-301-2

(

Facility:

Sequoyah 1 & 2

Date of Examination:

1/2008

-

Exam Level (circle one):

RO I SRO(I)(:;RO (uij

Operating Test No.:

NRC

Control Room Systems@ (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U, including 1 ESF)

System I JPM Title

Type Code*

Safety

Function

a.

W/E14 High Containment Pressure

(EA-1.1 )

3.7 I 3.7

D,A,S

5

Respond to High Containment Pressure (JPM 057AP1)

b.

003 Reactor Coolant Pump System

(A2.01)

3.5 I 3.9

N,L,S

4P

Respond to a #1 RCP Seal Failure

c.

001 Control Rod Drive System

(A3.05)

3.5 I 3.5

M,A,L,S

1

Shutdown Bank Withdrawal

d.

e.

f.

g.

h.

In-Plant Systems@ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)

i.

061 Auxiliary I Emergency Feedwater System

(A2.04)

3.4 I 3.8

D,A,E,R

4S

Operate the TD AFW Pump Locally (JPM 74-2AP)

j.

004 CI,eli lieal alld 'v'olUilie Conti 01 Systel Ii

(AZ.25)

3.8/4-:&-

D,R

'---1--

Ulieo'iti~IIedDilution Flow Patll IS9Iatiol~I-OPS0,6~+4:&)7~('"d'~!\\11~40'"2>>-~

~'f.

tl143 "I ~3/z~~n,

C-Y-tc.<,;"",<'d

'?e-t-

p/~.;,,,r

"-G'v-.t-_<:.~

<-..~

~(A.

'.

k ..A,,-(.j..*W,J. 1:::>, s<:..."""",t ... / L,="'-

k.

D(PJ. /tc EIe..G\\-t-\\c::..",J, 1:);sk\\"Du-Hc"" (A J, 10) :,.0/3,.3

D 1 ri

0

-Y;:-e",v5k ~v 'SD ~e.....J. 2.;11-1-14

~.iVv\\. (Vct1'f"'oC...(, ~ i41~ok(W(t

O~ I /l.p2.)

@

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions;

all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap

those tested in the control room.

NUREG-1021

Revision 9

ES-301

Control Room/In-Plant Systems Outline

Form ES-301-2

(

(

(

  • Type Codes

Criteria for RO / SRO-I / SRO-U

(A)lternate path

4-6 / 4-6 / 2-3 :>

(C)ontrol room

(D)irect from bank

~9/:':;8/

4],

(E)mergency or abnormal in-plant

1 /

1/:2::1\\

(L)ow-Power / Shutdown

1 /

1 / 21

7-

(N)ew or (M)odified from bank including 1(A)

2/

2/

1'</

(P)revious 2 exams

3/

3/

2 (randomly selected)

(R)CA

?; 1 /

1/21!fJ

(S)imulator

JPM Summary

JPM A

RHR spray will be established in accordance with FR-Z.1, High Containment Pressure. This is a Bank

Alternate Path JPM.

JPM B

An RCP seal failure will be diagnosed and the Abnormal Operating Instruction used to remove the pump

from service. This is a new low power/shutdown JPM

JPM C

A failure of the step counter will occur during the withdrawal of Shutdown Rods requiring a reactor trip.

This is a new alternate path low power/shutdown JPM.

JPM I

Plant JPM -The trip and throttle valve will not open electrically while TDAFW pump is being placed in

service locally. This is an Alternate path Bank JPM using emergency abnormal procedure performed inside

the RCA.

JPM J

Dilution flow path will be isolated using O-SI-OPS 062-214.0.

This is a Bank JPM performed inside the

RCA using an Appendix contains in a surveillance instruction.

NUREG-1021

Revision 9

ES-301

Operating Test Quality Checklist

Form ES-301-3

(

(

(

Facility:

Sequoyah 1 & 2

Date of Examination:

1/28/2008

Operating Test Number:

NRC

1. GENERAL CRITERIA

Initials

a

b*

c#

a.

The operating test conforms with the previously approved outline; changes are consistent

with sampling requirements (e.g. 10 CFR 55.45, operational importance, safety function

'/6 -;LJ t~~

distribution).

b.

There is no day-to-day repetition between this and other operating tests to be administered -rs

lyK!?

during this examination.

-rZJ

c.

The operating test shall not duplicate items from the applicants' audit test(s) (see Section

/'~

\\ri:7

D.1.a).

,7ZJ

d.

Overlap with the written examination and between different parts of the operating test is

/0

t~

within acceptable limits.

rzJ

e.

It appears that the operating test will differentiate between competent and less-than-

~

~ifv

competent applicants at the designated license level.

JZ---'

2. WALK-THROUGH CRITERIA

-

-

-

a.

Each JPM includes the following, as applicable:

initial conditions .,..

initiating cues ./

references and tools, including associated procedures v

reasonable and validated time limits (average time allowed for completion) and specific

designation if deemed to be time-critical by the facility licensee /"

17--~

operationally important specific performance criteria that include:

76

- detailed expected actions with exact criteria and nomenclature v

- system response and other examiner cues .,'

- statements describing important observations to be made by the applicant ,"

- criteria for successful completion of the task ",,"

- identification of critical steps and their associated performance standards ./

- restrictions on the sequence of steps, if applicable ."

b.

Ensure that any changes from the previously approved systems and administrative walk-

through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of

~

f7J {~

the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC

examinations) specified on those forms and Form ES-201-2.

3. SIMULATOR CRITERIA

-

-

-

The associated simulator operating tests (scenario sets) have been reviewed in accordance with

~ -n: .~

Form ES-301-4 and a copy is attached.

Printed Name / Signa~Q.

Date

.---r/'

~rvz'-5 /-:~~,

/1--

//;7108

a.

Author

7 hOl11ffS

b.

Facility Reviewer (*)

~,

i.)tlJLc.~

-:>>:

Iff 7/0 4

. I

...."'"'- '-'

.1-_ ./~~~..I~

c.

NRC Chief Examiner (#)

't-f\\ MUl A"'v':) AIK7 '/n~..~/l fti. 1l1'::1f:--.-..

o i /1"3!~trJB

d.

NRC Supervisor

J).AtG(jJJ...l.\\V If)MJJ.JAJ I 7!:.mlor

....-.--

t'i!lJ/!",

\\ " \\

.~

NOTE:

The facility signature is not applicable for NRC-developed tests.

Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.

NUREG-1021

Revision 9

ES-301

Simulator Scenario Quality Checklist

Form ES-301-4

(

(

Facility:

Sequoyah 1 & 2

Date of Exam:

1/28/2008

Scenario Numbers:

1,2,3,4

Operating Test No.:

NRC

QUALITATIVE ATTRIBUTES

Initials

a

b*

c#

1.

The initial conditions are realistic, in that some equipment and/or instrumentation may be out of

73

service, but it does not cue the operators into expected events.

10 W$

2.

The scenarios consist mostly of related events.

-J~ "J'1-' ~

3.

Each event description consists of

the point in the scenario when it is to be initiated

the malfunction(s) that are entered to initiate the event

1~

/~ JV

the symptoms/cues that will be visible to the crew

the expected operator actions (by shift position)

the event termination point (if applicable)

4.

No more than one non-mechanistic failure (e.g., pipe break) is incorporated into the scenario without '70

1'~

a credible preceding incident such as a seismic event.

7Z/

5.

The events are valid with regard to physics and thermodynamics.

7~ -IZ..-

\\~

6.

Sequencing and timing of events is reasonable, and allows the examination team to obtain complete '76

'j~

evaluation results commensurate with the scenario objectives.

-rt>>

7.

If time compression techniques are used, the scenario summary clearly so indicates.

Operators

/'-5 Jl;

\\,,~

have sufficient time to carry out expected activities without undue time constraints.

8.

The simulator modeling is not altered.

?~ ri- ~

9.

The scenarios have been validated. Pursuant to 10 CFR 55.46(d), any open simulator performance

deficiencies or deviations from the referenced plant have been evaluated to ensure that functional

/~ 71J ~

fidelity is maintained while running the planned scenarios.

10.

Every operator will be evaluated using at least one new or significantly modified scenario. All other

7~

~

scenarios have been altered in accordance with Section 0.5 of ES-301.

1V

11.

All individual operator competencies can be evaluated, as verified using Form ES-301-6 (submit the

-/:5

.~

form along with the simulator scenarios).

jJ../

12.

Each applicant will be significantly involved in the minimum number of transients and events

-;!~

~~

specified on Form ES-301-5 (submit the form with the simulator scenarios).

TL/

13.

The level of difficulty is appropriate to support licensing decisions for each crew position.

76 ~ '{'(lD

Target Quantitative Attributes (Per Scenario; See Section D.5.d)

Actual Attributes

-

-

-

1

2

3

4

1.

Total malfunctions (5-8)

8/

16""' 7/ '16/ -;f~ -;L; Mf:,

2.

Malfunctions after EOP entry (1-2)

2""'

1...-- 72/ ;2/ /~

-rc; ~

3.

Abnormal events (2-4)

3""-

3"

4/

3/

.~

"T/.J

l~~

4.

Major transients (1-2)

1/

1v

1 /

1/ /,:) /L

i:~ID

5.

EOPs entered/requiring substantive actions (1-2)

1,/

1/

1/

1/ ?5

'17- "rib

6.

EOP contingencies requiring substantive actions (0-2)

1v

0,/

1/

1/ 7'7

7tr- ~

7.

Critical tasks (2-3)

2/

3v 2/

2/ 7~ -rt- vWJ3

NUREG-1021

Revision 9

ES-301

Transient and Event Checklist

Form ES-301-5

(

(

(

Facility:

Sequoyah 1 & 2

Date of Exam:

1/28/2008

Operating Test No.:

NRC

A

E

Scenarios

P

V

P

E

1

2

3

4

T

M

L

N

Spare

0

I

I

T

T

N

CREW

CREW

CREW

CREW

C

POSITION

POSITION

POSITION

POSITION

A

I

A

T

L

M

N

Y

U

T

P

M(*

E

S

A

B

S

A

B

S

A

B

S

A

B

R

I

U

R

T

0

R

T

0

R

T

0

R

T

0

0

C

P

0

C

P

0

C

P

0

C

P

RX

0",,-

1

1

1

1

0

NOR

1/

I

0

1

1

1

1

SROU

I/C

,\\5/

Z

3

8

4

4

2

MAJ

1/

i

0

1

2

2

1

TS

3/

c

0

3

0

2

2

RX

1/

0/

1

1

1

0

NOR

Ov

1/

1

1

1

1

SROI-1

I/C

3/

5/

8

4

4

2

0

MAJ

1v

1 v

2

2

2

1

TS

0

3/

3

0

2

2

RX

0

1/

0

1

1

1

0

NOR

I

0"

1

1

1

1

1

SROI-2

I/C

Y

4/

7

11

4

4

2

MAJ

f

1 v

2

3

2

2

1

TS

~

Ov

2

2

0

2

2

0

1

0

1

1

1

0

1

0

1

2

1

1

1

NA

7

5

3

15

4

4

2

1

1

1

3

2

2

1

2

0

0

2

0

2

2

1

1

0

1

1

1

4

4

2

2

2

1

0

2

2

NUREG 1021

Revision 9

ES-301

Transient and Event Checklist

Form ES-301-5

(

Facility:

Sequoyah 1 &2

Date of Exam:

4/9/2007

Operating Test No.:

NRC

A

E

Scenarios

P

V

P

E

1

2

3

4

T

M

L

N

Spare

0

I

I

T

T

CREW

CREW

CREW

CREW

N

C

POSITION

POSITION

POSITION

POSITION

A

I

A

T

L

M

N

Y

U

T

P

M(*

E

S

A

B

S

A

B

S

A

B

S

A

B

R

I

U

R

T

0

R

T

0

R

T

0

R

T

0

0

C

P

0

C

P

0

C

P

0

C

P

1

1

0

1

1

1

4

4

2

2

2

1

0

2

2

1

1

0

1

1

1

4

4

2

2

2

1

0

2

2

1

1

0

1

1

1

4

4

2

2

2

1

0

2

2

Instructions:

1.

Circle the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event

type; TS are not applicable for RO applicants. ROs must service in both the "at-the-controls (ATC)" and

"balance-of-plant (BOP)" positions; Instant SROs must do one scenario, including at least two instrument or

component (I/C) malfunctions and one major transient, in the ATC position.

2.

Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section

D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be

replaced with additional instrument or component malfunctions on a 1-for-1 basis.

3.

Whenever practical, both instrument and component malfunctions should be included; only those that require

verifiable actions that provide insight to the applicant's competence count toward the minimum requirements

specified for the applicant's license level in the right-hand columns.

This matrix assumes that Scenario 3 is used as the spare. If scenario 3 is used in combination with any

other scenario, the minimum requirements are still met for each applicant.

NUREG 1021

Revision 9

ES-301

Competencies Checklist

Form ES-301-6

(

(

Facility: Sequoyah 1 & 2

Date of Exam:1/28/2008

Operating Test No.: NRC

SRO

RO (ATC)

BOP/CRO

Competencies

SCENARIO

SCENARIO

SCENARIO

1

2

3

4

1

2

3

4

1

2

3

4

Interpret/Diag-

2,3,6,

3,4,5,

3,4,5,

2,5,6,

1,2,3,

2,5,6,

3,4,5,

nose Events

2-9

1-7,9

2-9

2-9

9

6,7,9

6,8,9

7,8

4-8

4,7,8

7

9

and Conditions

Comply With

1,2,3,

3,5,6,

1,3,4,

1,2,5,

1,4,5,

1,2,3,

1,2,6,

1,3,4,

and Use

ALL

ALL

ALL

ALL

6,8,9

9

5,6,8,

6,7,8

6,8

5,7

7

5,6,7,

Procedures (1)

9

9

Operate

1,2,3,

3,5,6,

1,3,4,

1,2,5,

1,4,5,

2,3,5,

1,2,6,

1,3,4,

Control Boards

N/A

N/A

N/A

N/A

6,8,9

9

5,6,8,

6,7,8

6,8,7

7

7

5,6,7,

(2)

9

9

Communicate

1,2,3,

1,3,4,

1,3,4,

and

ALL

ALL

ALL

ALL

6,8,9

3,4,5,

5,6,8,

1,2,5,

1,4,5,

1,2,3,

1,2,5,

5,6,7,

6,7,9

6,7,8

6,8,7

4,7,8

6,7

Interact

9

9

Demonstrate

Supervisory

ALL

ALL

ALL

ALL

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Ability (3)

Comply With

and Use Tech.

2-4

1,2,4

3,4

2,3

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Specs. (3)

Notes:

(1)

Includes Technical Specification compliance for an RO.

(2)

Optional for an SRO-U.

(3)

Only applicable to SROs.

Instructions:

Circle the applicants' license type and enter one or more event numbers that will allow the

examiners to evaluate every applicable competency for every applicant.

NUREG-1021

Revision 9

ES-401

Written Examination Quality Checklist

Form ES-401*6

~-CilitY:5(~~uoyah u s:

Date of Exam: 1/;1.008

Exam Level' RO .:*iSRO~1

..

Initial

Item Description

a

b*

c'

--;15

-

1

Questions and answers are technically accurate and applicable to the facilitv.

71r-J ~

2.

o .

NRC KJAs are referenced for all questions.

-;s

J}--/ rrIf?

b.

Facility learning objectives are referenced as available.

3.

SRO guestions are appropriate in accordance with Section D.2.d of ES-401

--J6

-rz,J

v'v'R>

-

....

4

The sampling process was random and systematic (If more than 4 RO or 2 SRO questions

% 1P ~

were repeated from the last 2 NRC licensmp exams, consult the NRR OL program office).

5.

Question duplication from the license screening/audit exam was controlled

as indicated below (check the item that applies) and appears appropriate:

_

the audit exam was systematically and randomly deveioped; or

_

the audit exam was completed before the license exam was started; or

76 JZJ ~

__ the examinations were developed independently; or

"Jf.- the licensee certifies that there is no duplication; or

__ other (explain)


_._-

Ban:-r Mcditied

6.

Bank use meets limits (no more than 75 percent

New

from the bank, at least 10 percent new, and the rest

5/~-r;3 ~

25

/'6 "f1J fYIf;>

new or modified); enter the actual RO / SRO-only

,J,7 I IS

r----

question distribution(s) at right.

7.

Between 50 and 60 percent of the questions on the RO1MClnory

CIA

exam are wntten at the comprehension/ analysis level,

-15

the SR.O exam may exceed 60 percent If the randomly

-n> ~

selected K/As support the hiqhe: cognitive levels, enter

3 c;

/ 7

i70

/ la

the actual RO I SRO question distributiorus) at light

J

8.

References/handouts provided do not give away answers

-;:5 7lr/ IVS

or aid in the elimination of distractors.

9.

Question content conforms with specific K/A statements in the previously approved

examination outline and is appropriate for the tier to which they are assigned;

/6 .-fl-/

/'if:>

~.

deviations are justified.

10.

Question psychometric quality and format meet the guidelines in ES Appendix B.

-/~

--y1--

1W1S

11

The exam contains the required number of one-point, multiple choice items;

-D 11P ~~

the total is correct and agrees with the value on the cover sheet.

____

Printed Name / ~nat~~

Date

a. Author

210mm

O:'IV~'> / '/L/

-

v----:=:-

//1/ot'

b. Facility Reviewer (*J

-Z;Z~~...

/././/6'-

/~~ /'.;, /Z

fft;

c. NRC Chief Examiner (#)

~ It BtrT$/ ff;["J (j, I '" .J;:-:...

d

NRC Regional Supervisor

J..!J4<AUJ---r:. WttiJ)NV.t>J /

~

.

~

(

.

"----'"

"

Note:

  • The facility reviewer's initials/signature are not applicable for NRC-developed examinations.
  1. Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.

ES-401, Page 30 of 34

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KiA#

B

L

L

Psychometric Flaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q~

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KiA

Only

S

Dist

Dist

BIW

GENERAL COMMENTS

B= Bank 1M=Modified 1N-New 1F-Fundamental Level (I.E. Memory) 1H-Higher Cognitive Level (I.E. CIA)

I

For All BANK questions: swap the order of the answer choices so that applicants cannot rely on recall of the correct answer location.

ROEXAM

I

007EAl.08

N

H

2

B

Can the first two bullets be replaced with the following single bullet:

"Unit I was at 10% power when both MFPTs tripped."

S

First bullet revised. Second bullet not changed. The teaching in the

second bullet does not affect the a11SWerS to this question or any other

questions. OK MAB 02/04/2008

Can the third bullet read as follows:

"Stearn generator levels dropped to a minimum of##% and then began to

rise." - (use a level that is a couple ofpercent above the AFW start signal)

Incorporated. OK MAB 02/0412008

l

.'

Is there an extra space in the correct answet between "controlled" and

"manually"? Fixed OK MAB 02/0412008

Is there an extra space in "A" and "B" between "required" and "to"?

Fixed OK MAB 02/04/2008

2

008AA2.29

N

H

2

B

Be consistent with periods in answer choices. Fixed. OK MAB

02/0412008

S

Does the cause of the lowering RCS pressure affect which answer is

correct? Is it important to state that pzr pressure is inadvertently lowered

with pzr sprays or that the safety leakage rises, etc? If the pressure drop

results from a problem elsewhere, then the level behavior may change.

Discuss with licensee.

Licensee agreed. Comment incorporated. OK

MAB 02/04/2008

3

009EA2.24

N

H

2

B

There is no point in stating the reason why the RCPs are required to be

tripped. Consider the following suggestion for the answer choices:

S

A.

ALL RCPs are required to be tripped.

Page I of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KJA#

B

L

L

Psychometric Flaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q=

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KJA

Only

S

Dis!

Dis!

BIW

B.

ONLY RCP #1 and #3 are required to be tripped.

C.

ONLY RCP #1 is required to be tripped.

D.

ONLY RCP #3 is required to be tripped.

Incorporated. OK MAB 02/04/2008

4

01lEK3.13

B

F

2

B

Change answer choices to:

A.

Realigns the ECCS suction path from the RWST to the

S

contairunent sump.

B.

No change needed

C.

No change needed

D.

Realigns the ECCS flow to prevent boron precipitation.

Incorporated for "D". Licensee and CE agreed on change for "A". OK

MAB 02/0412008

5

015/017

B

H

2

S

Suggest making slight modification to "C" and "D":

AK2.08

C.

The RCP stator windings will overheat.

D.

The RCP motor bearings will overheat.

Incorporated. OK MAB 02/04/2008

6

022AA2.03

B

H

2

X?

B

Have licensee explain the mechanism for "A" to occur. I need to better

understand the failure mechanism that can cause the charging to go to 120

S

gpm and then retum to normal with pressurizer level also returning to

nonna!.

Licensee modified "A" based on comment. OK MAB 02/04/2008

7

025AK2.05

M

H

2

X?

Y

"B" and "D" plausibility: Why would it be plausible for an applicant to

ii

+

believe that spray pumps would be drawing suction from the sump when

,

there is 68% remaining in the RWST? Also, why would an applicant

S

believe that suction for the spray pumps would be from the sump when

they are in ECA-I.I. If adequate level existed in the sump and spray

pumps are operating why would they be in ECA-I.I ?

Parameters in the stem changed to address these concerns. The changes to

the parameters also caused the correct answer to change. OK MAB

02/04/2008

This question contains overlap flaws with questions on the SRO exam.

This question provides information that indicates that E-Ois entered upon a

reactor trip. I think this comment could alleviate itself ifthe issues on the

SRO exam are resolved. Concern addressed on SRO exam. OK MAB

02/0412008

Add a period after the sentence at 08:0 l. Fixed. MAB 02/04/2008

Does the information in the stem preclude an applicant from assuming that

containment pressure could have been greater than 12 psid and has now

decreased to 9.7 psid? Ifthis is an assumption that the applicants are

Page 2 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KiA#

B

L

L

Psychometric Flaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q=

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KiA

Only

S

Dist

Dist

B/W

forced to make, would it change the correct answer. Is there a possible

argument that there are two correct answers to this question based on

forcing the applicant to make assumptions? Qnestion statement has been

enhanced to preclnde an assnmption that conld make two answers correct.

There is enough info in the stem to preclnde applicants having a need to

make any assumptions on containment pressure. OK MAB 02/04/2008

8

026AK3.03

B

F

2

x

E

"B" and "C" are really the same distractor. They both state to reduce heat

load, or minimize heat load. "C" implies that RCPs must not be needed if

S

they are not cooled to maintain CCS within design capability.

One ofthese two distractors should be modified/replaced. "B" has been

changed to address concem. OK MAB 02/04/2008

9

027AAI.02

B

H

2

E

"start" should be plural in the answer choices. Fixed. OK MAB

02/04/2008

S

Delete the piece of each answer choice that states that heaters ENERGIZE

or DEENERGIZE. This is not needed to make answer choices unique. I.E.

A. Pressurizer Pressure HI alarm annunciates. Actual pressurizer pressure

starts to rise.

Etc. for the rest ofthe answer choices.

Incorporated. OK

MAB 02/04/2008

10

038G2.1.3

N

F

2

E

Technical accuracy of "A" and "B": Is there a requirement to cool the

plant prior to tumover? The supporting documentation does not support

S

this. The supporting documentation supports that the cooldown is not

J.!

permitted to be performed by an operator who is simultaneously

"

conducting tumover. This is different than requiring that the cooldown

take place prior to tumover. TIle more precise way to phrase this would be

to state the converse ofwhat is stated in "C" and "D". I.E. An operator is

not permitted to simultaneously tumover and perform the cooldown.

Incorporated. OK MAB 02/04/2008

First part of "C" and "D" also needs wording enhancements because

OPDP-I would not provide direction to cooldown while ccncurrently

performing tumover. OPDP-I provides Administrative guidance, not

guidance that is specific to the SGTR accident. Consider: An operator is

permitted to simultaneously turnover and perform the cooldown.

Incorporated. OK MAB 02/04/2008

II

040AKI.03

B

F

2

x

y

KIA Match: The IvA requires testing knowledge of operational

implications of RCS shrink and depressurization as they apply to steam

S

line break. This question tests knowledge ofbrittle failure which stems

from an RCS cooldown and subsequent pressurization.

New Q written. OK MAB 02/04/2008

Page 3 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KlA#

B

L

L

Psychometric Flaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q-

SRO

E

Explanation

N

K

D

Focns

Cred

Cred

KIA

Only

S

Dist

Dist

B/W

This question has other issues with distractors, but because ofthe above

comment, there is no need to address these comments at this time.

New Q written. OK MAB 02/04/2008

12

055G2.4.29

N

F

I-

x

.y

Is the 19:30 bullet worded correctly?

2

Q replaced. OK MAB 02/04/2008

S

Punctuation in answer does not appear to be correct,

Q replaced. OK MAB 02/04/2008

KIA not Matched: The KIA requires a SBO. Does this question test

knowledge ofa SBO, or just knowledge of a security threat? The way I

read this question is that you could delete all the information in the stem

and simply state that there is a credible insider security t1ueat and it is

necessary to dispatch an operator to the EDG room.

In other words, the

LOOP appears to be irrelevant.

Q replaced. OK MAB 02/04/2008

13

056AKI.03

B

H

I-

x

.g

Be consistent with periods after bullets. Fixed. OK MAB 02/04/2008

2

S

Replace "D" with the logical error that would result from subtracting 15 psi

from 2085.

Incorporated. OK MAB 02/04/2008

Consider combining the subtraction of 15 psi and tile use ofThot to replace

"e".

Incorporated. OK MAB 02/04/2008

Technically this question could be rated as U, but the fix is simple enough

that it is being rated as E. The above comment incorporation will help to

make the LOD more acceptable. As written, two distracters are not

plausible. It is not reasonable for a licensed operator to use Tcold or Tave

in a subcooling calculation.

Noted. Issues addressed. OK MAB 02/04/2008

14

058AK1.01

B

H

2

.g

After 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> would the batteries be discharged? Or is there a requirement

that only states that the batteries will not be discharged prior to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />?

S

We need to ensure that the aIISWer choices accurately represent the status

ofthe batteries. Concems addressed by changing the wording. OK MAB

02/04/2008

15

062AA1.01

M

F

2

S

Q is SAT.

16

W/E04

B

F

I-

x

X?

.g

Be consistent with periods in the aIISWer choices. Fixed OK MAB

G2.4.28

2

'I

02/04/2008

Page 4 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KlA#

B

L

L

Psychometric Flaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Nou

Partial

Miu

Q-

SRO

E

Explanation

N

K

D

Focus

Crcd

Crcd

KIA

Only

S

Dist

Dist

B/W

S

Distractor "A" is not plausible. ECCS flow is an indirect parameter, which

will follow RCS pressure, which is answer choice "DO'. It does not have

the procedure guidance to monitor the indirect parameter (ECCS flow)

when the direct parameter is available (RCS P).

Concern addressed. OK MAE 02/04/2008

I also have some issues with "B" because subcooling is calculated from

RCS pressure. It makes no sense to monitor the calculated parameter when

the direct parameter is available. Concern addressed. OK MAB

02/04/2008

The only thing that makes "A" and "B" incorrect is that the procedure does

not state these parameters, but they would work as a method for

determining ifthe leak was isolated. Noted.

MAB 02/04/2008

The KIA does not restrict this question to be written to test leak isolation.

Noted.

MAB 02/0412008

17

W/E05

B

F

2

X?

E

How is "A" different from "D"? Are these unique answer choices? It

EK3.1

should be possible to modify the wording ofthese two distractors to ensure

S

that they are unique, I.E., "A" could be pertaining to high temperatures

and "DO' could speak to cold water on dry tubes as is suggested in the

distractor analysis. Wording in "DO' enhanced to ensure uniqueness of

answer choice. OK MAB 02/04/2008

18

W/Ell

M

H

1

x

Y

Question does not discriminate at the licensed operator level. This is a

EK2.2

h

question that, when provided the reference, almost anyone could arrive at

REF

S

the correct answer.

i

Following suggestion incorporated. OK MAB 02/04/2008

Suggestion to improve question:

Use most of the same items in the stem. Some can be deleted if they

become unnecessary,

Q: Which one ofthe following correctly describes the flow rate that meets

the intent of ECA-l.1, Step 20 RNO?

A.

Establish 325 gpm ECCS flow. ECCS pumps may be started

and stopped as necessary to accomplish the desired flow rate.

B.

Establish 325 gpm ECCS flow. ECCS pumps are not permitted

to be started and stopped as necessary to accomplish the desired

flow rate.

C.

Establish 400 gpm ECCS flow. ECCS pumps may be started

and stopped as necessary to accomplish the desired flow rate.

D.

Establish 400 gpm ECCS flow. ECCS pumps are not permitted

to be started and stopped as necessary to accomplish the desired

flow rate.

This suggestion raises the plausibility ofthe distractors and still tests

Page 5 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KlA#

B

L

L

PsychometricFlaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q=

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KIA

Only

S

Dist

Dist

B/W

whether the applicants understand the intent of the procedure step.

Suggestion incorporated. OK MAB 02/04/2008

19

001AK2.05

M

H

1-

B

Be consistent with periods behind bulleted phrases. Fixed. OK MAB

2

02/04/2008

S

Would the question be enhanced if one ofthe Thot or Tcold instruments

were to fail instead ofthe Tavg auctioneering unit? Discuss with licensee.

Decided not to make a change on temp inst. OK MAB 02/04/2008

20

033G2.4.2l

M

F

2

S

Q is SAT

21

036AKl.Ol

N

F

2

S

Maintain past tense in third bullet. Somewhat incorporated, but it does not

affect technical accuracy of question. OK MAB 02/04/2008

Question is written in the "NOT' format, which is discouraged by

NUREG-l02l. This question can remain in its current form as long as the

licensee agrees that the question being in this format will not affect

applicant performance. In other words, their applicants have seen

questions in this format and would not get the incorrect answer for any

other reason than a knowledge weakness.

Noted. OK MAB 02/04/2008

22

060AAl.02

M

F

2

X?

x

lei

KIA Match: Have the licensee provide an explanation ofhow the KIA is

matched. The KIA requires testing knowledge ofhow to operate or

S

monitor ventilation systems during an accidental gaseous radwaste release.

1'

How is a ventilation system being monitored? Rad Mntr is part ofthe

ventilation system. KIA match is OK. MAB 02/04/2008

When would the Waste Gas Rad Monitor not detect a leak from a Waste

Gas Decay Tank? Changed stem to a flange leak which would not cause

the Waste Gas Rad Mntr to alarm. OK MAB 02/0412008

23

069G2.4.45

N

H

2

B

Technical accuracy ofthe question is a concern because they do not have

to restore integrity within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Ifthey do not restore integrity within 1

S

hour, then they are required to shutdown. TIle answer choices need to be

more precise in order to be technically correct.

Wording enhancements made to specifically ask for what the Action

Statement states. OK MAB 02/04/2008

24

074EK3.07

B

F

1

x

lei

LOD= 1: Distractors are not plausible. Due to the non-credible distractors,

this question does not discriminate at the appropriate level to make a

S

licensing decision. Changed distractors. OK MAB 02/04/2008

Reflux boiling is a cooling method used when RCPs are off.

How would it be reasonable for an operator to think that starting an RCP

Page 6 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KJA#

B

L

L

PsychometricFlaws

Content Flaws

U

Comment

M

0

0

Stem

Cnes

T/F

1 Non

>1 Non

Partial

Min

Q-

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KJA

Only

S

Dist

Dist

B/W

would keep pressure from rising?

Changed distractor. OK MAB 02/04/2008

2S

076AK2.01

B

H

I

x

tf

A pinhole leak of a fuel assembly would be evident in RCS samples that

are analyzed for various isotopes; however, small leaks will not necessarily

S

result in rising radiation monitor trends. There are concerns with "B"

being an altemate correct answer because the size of the leak is not

defined. Also, the RCS leakage locations are not defmed, so there are also

concems about whether a small RCS leak would result in a rising rad

monitor reading.

"Significant increase in RCS activity" added to stem. OK MAB

02/04/2008

LOD= I: Distractors are not plausible. Due to the non-credible distractors,

this question does not discriminate at the appropriate level to make a

licensing decision.

Question is on the cusp ofbeing unacceptable due to low LOD. Noted.

MAB 02/04/2008

Consider writing a question that has a plant nip and a SGTL. This will

allow testing MSL monitors as well as Condenser Off Gas Monitors. This

idea may help to raise the question to a level where it could be used to

discriminate between a competent and less than competent licensed

operator.

Not incorporated. Allowed by CEo The rest ofthe exam is at an

acceptable level to not warrant a change to this question. OK MAB

02/04/2008

26

W/E09

B

H

2

B

The "repressurization" piece of "A" and "B" should be deleted. It does not

EA2.1

add information that is needed to make these answer choices unique.

S

Discuss with licensee. Deleted. OK MAE 02/04/2008

Consider rewording the question as follows:

Which one ofthe following correctly states the procedure that maximizes

the allowable cooldown rate for the provided circumstances and the

maximum cooldown rate allowed by that procedure?

A.

Use ES-0.2, Natural Circulation Cooldown. The cooldown

limit is SOF/hr.

B.

Use ES-0.2, Natural Circulation Cooldown. The cooldown

limit is 100F/hr.

C. / Use ES-O.3, Natural Circulation Cooldown with Steam Voids in

Vessel (with RVLSI). The cooldown limit is SOF/hr.

D.

Use ES-O.3, Natural Circulation Cooldown with Steam Voids in

Vessel (with RVLSI). The cooldown limit is SOF/hr

Incorporated. OK MAE 02/04/2008

Page 7 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KlA#

B

L

L

Psvchometric Flaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q~

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KIA

Only

S

Dist

Dist

B/W

27

W/EI4

B

F

2

S

Q is SAT.

EA2.2

28

003K3.04

B

H

2

S

Q is SAT.

29

003G2.3.10

N

F

2

S

Q is SAT.

30

004K5.26

N

H

2

S

Q is SAT.

31

004A3.08

B

H

I-

X

B

"D": it is not credible for an applicant to make this error. There is no

2

division needed in this calculation.

S

Consider making "D" 60%. Discuss with licensee

Incorporated. OK MAB 02/04/2008

32

005A4.03

B

H

I-

x

y

"RCS cooldown rate is too high" - what does this mean? It may not

2

matter, but it would be better to provide the applicant with information that

S

they would normally have available to them, such as an actual temperature

at two different times. It may also be necessary to state that SRO gave

them direction to cooldown at a certain value. The question piece would

need to change slightly to ask for the actions needed to comply with the

SRO's directions. (These changes will make "C" plausible)

Q replaced. OK MAB 02/04/2008

Question should be tied to the procedure. I.E. Which one of the following

..... CONSTANT RHR flow, in accordance with 0-SO-74-1, "procedure

title"?

Q replaced. OK MAB 02/04/2008

"A" and "B" do not contain credible misconceptions to discriminate

between competent and less than competent licensed operators.

Q replaced. OK MAB 02/04/2008

33

006KI.02

M

F

2

B

Is there an extra space between "SSPS" and "if' in the stem?

Fixed. OK MAB 02/04/2008

S

Have licensee walk me through the technical aspects of the question. I

may be OK with the question with a couple of minutes of discussion.

Q is SAT. MAB 02/04/2008

34

007K3.01

B

H

2

x

B

Is there an extra space in "D" between "..4," mId "failed"?

Fixed. MAB 02/0412008

S

"C" not plausible because there is no relationship with the PRT.

The following change would correct the distractor plausibility issue:

A.

  1. 2 seal on RCP #4 failed; Pressurizer Safety Valve, 1-68-568,

failed open; Reactor Head Vent Valve, I-FCV-68-394, Failed

Page 8 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KlA#

B

L

L

Psychometric Flaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q-

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KIA

Only

S

Dist

Dist

BIW

Open

B.

  1. 2 seal on RCP #4 failed; Pressurizer Safety Valve, 1-68-568,

failed open; Reactor Head Vent Valve (I-FCV-68-394, Failing

Open, could not cause the stated conditions)

C.

Pressurizer Safety Valve, 1-68-568, failed open; Reactor Head

Vent Valve, I-FCV-68-394, Failed Open (#2 seal on RCP #4

failing could not cause these conditions)

D.

Pressurizer Safety Valve, 1-68-568, failed open (Pressurizer

Safety Valve, 1-68-568, failing open could not cause the stated

plant conditions AND Reactor Head Vent Valve, I-FCV-68-

394, Failing Open could not cause the stated plant conditions.)

Discuss the above change with thelicensee, If we can get this change to

work, then the question may be SAT.

Worked with licensee to develop plausible distractors. OK MAB

02/04/2008

35

007G2.1.1

N

F

2

x

B

Is fourth bullet worded correctly? Fixed. MAB 02/04/2008

S

"A" and "B" are not mutually exclusive, which harms their plausibility. In

other words, If"B" were true, it will still makes sense to do "A". The

problem is that ifthe applicant determines that the alarm is valid, adjusting

level will always be correct.

"A" and "B" corrected. MAB 02/04/2008

Is there an extra space in "C" and "D" between "level" and "alarm"?

They neglected to correct this; however, the extra space appears in the

~! '

correct answer as well as a distractor, so it will not adversely affect

r'

plausibility. OK MAB 02/04/2008

The question should be specific to the answer choices provided:

Which one ofthe following correctly states the validity ofthe PRT level

alarm and the required actions as a result ofthe alarm?

Incorporated. OK MAB 02/04/2008

I would prefer to have "A" and "B" read as follows:

A. The PRT level alarm is valid. (need a better second halfofdistractor)

B. The PRT level alarm is valid. 0-SI-OPS-068-137.0, RCS Water

Inventory, is required to be performed.

A version ofthis comment was incorporated. AOP-R.05 was used. OK

MAB 02/04/2008

I would prefer the second halfof"C" and "D" to read such that it

specifically states the information being tested. I.E.:

C. The PRT level alarm is false. According to OPDP-4, the maximum time

that Maintenance has to correct the condition causing the invalid alarm is 7

days, at which time the alarm is required to be cleared/disabled.

Page 9 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KlA#

B

L

L

Psychometric Flaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q-

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KIA

Only

S

Dist

Dist

B/W

D. The PRT level alarm is false. According to OPDP-4, the maximum

time that Maintenance has to correct the condition causing the invalid

alarm is 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, at which time the alarm is required to be

cleared/disabled.

Incorporated. OK MAB 02/04/2008

36

008K4.07

N

F

2

x

E

Is there an extra space between "CCS" and "Pump" in the stem?

(I am beginning to think that it just may be the way it prints out and that

there may not be an extra space - but it is free to ask.)

S

Fixed. MAB 0210412008

Would it be possible to test the RED light on the throwover switch for the

first part of every answer choice. I think this would be a better test ofthe

actual plant indications. I.E. Either the red light is ON or OFF. Discuss

with licensee.

I think this could help the plausibility of "B".

Did not incorporate after discussions with licensee. MAB 02/04/2008

37

010K6.03

M

H

2

S

Be consistent with periods after bullets. Fixed. MAB 02/04/2008

Simplify the answer choices as follows:

A.

Master controller output would increase. PZR pressure would

be maintained above the reactor trip setpoint.

B.

Master controller output would increase. PZR pressure would

decrease to the reactor trip setpoint.

C.

Master controller output would decrease. PZR pressure would

be maintained above the reactor trip setpoint.

  • c

D.

Master controller output would decrease. PZR pressure would

"

be maintained above the reactor trip setpoint

Incorporated. MAB 02/0412008

38

012K4.04

N

H

2

X?

f

"A" and "D" are not plausible because the last bullet in the stem leads the

applicant to only consider answer choices where RTA "A" is different than

S

RTA "B" UV and Shunt coils. Simply using psychometrics, and applicant

can eliminate these two answer choices. Discuss with licensee.

Answer choices simplified. Issue resolved. OK MAB 02/04/2008

39

013K2.01

B

H

2

S

Potential overlap issues with 006Kl.02 should be discussed. Ifit is

determined that there is no overlap, then question may be SAT.

Overlap issue resolved. OK MAB 02/04/2008

40

022A2,04

N

H

2

X?

f

Is the wording correct in the second paragraph, "Compare the effects on of

the .."? Fixed. OK MAB 02/04/2008

S

Have the licensee explain the plausibility of additional cooling units being

placed in service. Are there additional cooling units that would be

available at any time in order to reduce temp? If there are additional

Page 10 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KiA#

B

L

L

PsychometricFlaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q~

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KiA

Only

S

Dist

Dist

BIW

cooling units that could be used, under what conditions would they

typically be used?

Additional cooling units are available one ofthe units. Unit differences

make the distractors plausible. OK MAB 02/04/2008

41

025K5.02

M

F

2

B

Is the incorrectness ofthis answer choice based entirely on the word

"each"? This needs to be discussed to ensure only one correct answer.

S

Distractors reworked to ensure only one correct answer. OK MAB

02/04/2008

42

026K4.07

M

F

2

B

The licensee needs to explain why the II% level requirement is because of

the I-FCV-74-3 interlock. I am not sure that the attached reference

S

material supports this. Maybe the supporting documentation is in another

print or lesson plan. Also as part ofthis discussion, the wording ofthe

question should be reviewed to ensure that it is accurate and will elicit the

answer.

Licensee explained the level requirement. OK MAB 02/04/2008

43

026G2.4.48

M

H

2

x

lei

Are there extra spaces in "A" and "B"? Fixed. MAB 02/04/2008

S

Will the terminology "loading room" confuse any ofthe applicants?

Should this be defmed with more precise terminology?

"loading room" deleted. OK MAB 02/04/2008

Is the wording of "A" and "B" precise enough? The pump did not (failed

to) auto start - this is a fact. I would prefer more precise terminology such

'1'[

as: "Pump did not auto start even with an auto start signal present."

Altemative similar wording would work as well.

Incorporated. OK MAB 02/04/2008

Should the answer choices contain commas or periods between the two

answer parts. It looks like two complete sentences are separated by

commas.

Two sentences used. OK MAB 02/04/2008

Second set ofbullets should be introduced with a colon, vice semi-colon.

Fixed. MAB 02/04/2008

Time in the stem is only provided to the minute, yet 14:05:00 is almost a

full 4 minutes from 14:07:59. The clock in the control room may read the

same, but this is greater than 180 seconds. Discuss whether this question

needs to be more precise to elicit the correct answer.

More precise times are not needed - I made an error with my math when

this comment was made. OK MAB 02/04/2008

"A" and "B" are not mutually exclusive because it may never be wrong to

Page II of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KlA#

B

L

L

PsychometricFlaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q=

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KIA

Only

S

Dist

Dist

B/W

verify that there is room on the EDG prior to manually placing a load on

the EDG. If "A" is correct, the "B" will also be correct,

Wording revised to ensure unique answer choices. OK MAB 02/0412008

When did the containment pressure reach 2.81 psig? Discuss whether this

is important information to contain in the stem.

Q stem is precise enough. OK MAB 02/0412008

"A" and "B" plausibility: Ifthe pump was supposed to auto start, then I

know, just using common sense, that the EDG is desigoed to have room to

start the pump (assuming that the sequencer has timed out). Ifthe

sequencer has not timed out, then it would not be smart to start the pump

anyway. "A" wording revised.

"B" determined to be OK with the change

to "A". OK MAB 02/04/2008

44

039Al.09

N

H

2

x

.g

KIA Match: The KIA requires testing knowledge ofmonitoring main

steam line radiation monitor parameters associated with operating the

S

MRSS controls to prevent exceeding design limits. How does this question

test the knowledge required by the KIA? How is knowledge ofthe

radiation monitor indications being tested in relation to how those

indications are used to avoid exceeding design limits?

Q replaced. OK MAB 02/04/2008

The question asks for the condition that is causing the alarm. Is there a

possibility that another condition, such as an actual high rad condition

could cause the alarm? High rad may not cause the other conditions, but

,1

could it cause the alarm? The wording ofthe question may need some

minor revision to ensure that the correct answer is elicited.

Q replaced. OK MAE 02/0412008

Are the second parts ofthe answer choices worded correctly? The subject

ofthe sentence appears to be implied. It would be better to state the noun.

Q replaced. OK MAE 02/04/2008

No reference is being suggested. Are the time requirements a closed book

knowledge item at SQ?

Q replaced. OK MAB 02/0412008

45

059A2.07

N

H

2

x

?

B

What conditions would automatically close the 2B MFPT Cond FCVs?

Valve operation depends on power being above or below 60%. OK MAB

S

02/0412008

"A" Plausibility: What is the logic behind the FCVs being re-opened in the

AOP? This distractor may not be plausible. It may not be credible for an

operator to think that they would re-open valves that automatically closed.

Discussed with licensee.

OK MAB 02/0412008

Page 12 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KiA#

B

L

L

PsychometricFlaws

Content Flaws

U

Comment

M

0

0

Stem

Cnes

T/F

1 Non

>1 Non

Partial

Min

Q=

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KiA

Only

S

Dist

Dist

B/W

The stem and answer choice talks about some AOP that has been entered.

Is there a reason that the AOP that the operators are performing is not

mentioned in the stem or the answer choices? Discuss the possibility of

adding the AOP to tighten the question and tie the answers to a specific

AOP. AOP-S.OI added to the stem. OK MAB 02/04/2008

46

059A4.01

M

H

2

S

Second to last bullet: I assume the SG level is below setpoint, but this

needs to be specific. Fixed. MAB 02/04/2008

Last Bullet: is it necessary to state that the dumps are armed?

No - "armed" deleted. OK MAB 02/04/2008

47

061K5.01

B

H

2

S

Typos in 5th bullet. Fixed. MAB 02/04/2008

Trends are provided for all parameters except for SG levels.

Added. MAE 02/04/2008

48

062KI.02

B

F

2

B

Too many items are being iterated on in the answer choices. This provides

the applicants with multiple ways to eliminate distractors. Discuss with

S

licensee. Discussed. OK MAB 02/04/2008

Consider the following:

A.

After 1.25 seconds, all EDGs will auto start .

B.

After 1.25 seconds, only the IB-B EDG will start.

C.

After 300 seconds all EDGs will autostart.

c

D.

After 300 seconds only the IB-B EDG will statio

Incorporated. OK MAB 02/04/2008

49

063K2.01

N

H

2

?

+

Distractor analysis states that an applicant may think that control power for

the breaker is supplied from the EDG battery. Why would an applicant

S

think this. Do the EDG batteries supply control power to other buses or to

this bus under different plant conditions? I need to understand the credible

misconception a little better.

Answer choices revised to correct issue. OK MAE 02/04/2008

50

064K6.08

B

F

2

x

x

.y

"B" is not plausible: TIle entire reason for having a standby pump is to

have it backup the lead pump. The second pump is not referred to in the

S

distractor as the standby pump, but it is strongly implied by the stem

stating that there is a lead pump. A manual alignment does not appear to

make sense.

Distractors revised. OK MAB 02/04/2008

"C" is not plausible because the stem provides a cue that these pumps start

on tank level. "C" allowed this distractor to stay on exam after discussions

with licensee. OK MAB 02/04/2008

Page 13 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KlA#

B

L

L

Psychometric Flaws

Content Flaws

U

Comment

M

0

0

Stem

Cnes

T/F

1 Non

>1 Non

Partial

Min

Q=

SRO

E

Explanation

N

K

0

Focus

Cred

Cred

KIA

Only

S

Dist

Dist

BIW

"A" is the obvious answer because the stem states that these pumps start on

low tank level. It would also be common sense to assume that the standby

pump would not stilt at the same time or level as the lead pump, which is

why it is a standby pump. After discussion with licensee, decided to allow

this distractor. OK MAB 02/04/2008

If possible, place the conditions of the plant in the stem, rather than making

the answer choices conditional. A specific tank level and switch position

for the backup pump should be placed in the stem.

It is not prohibited to place conditions in answer choices, therefore Q was

not changed. OK MAB 02/04/2008

Consider the following:

Initial plant conditions:

-

2A-A EDG running

-

Fuel oil day tank level = ##%

-

Lead fuel oil transfer pump is running

-

The backup fuel oil transfer pump control switch is in AUTO

Current plant conditions:

-

Lead fuel oil transfer pump shaft completely shears

Which one of the following correctly describes the operation of the backup

fuel oil transfer pump?

A.

The backup pump will be running due to a start signal on low

discharge pressure.

B.

The backup pump will be running due to a start signal on low

tanklevel.

C.

The backup pump will not be running and will not start at

anytime as tank level lowers.

D.

The backup pump will not be running, but will start as tank

level lowers with no discharge pressure on the lead pump.

Allowed Qto remain with only minor revision. OK MAB 02/0412008

51

073AI.01

N

II

2

x

g

Is second bullet worded correctly? Fixed. MAB 02/04/2008

F

S

Be consistent with periods behind bullets. Licensee did not incorporate

this comment, but does not affect the technical accuracy of the question,

OK MAE 02/0412008

This question is really written at the (Fnmdamental knowledge level.

It

appears like there may be infonnation in the stem that does not add value

to the question. The question really does not ask anything more than:

What automatic actions occur as a result of2-RM-90-123A alarming on

high radiation? Licensee did not incorporate comment, TIley are in the

middle ofthe band for CIA and F questions, therefore designating this

question in either category will not cause all exam metric to be encroached

Page 14 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KlA#

n

L

L

Psychometric Flaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q-

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KIA

Only

S

Dist

Dist

BIW

upon. I would have required this to be fixed if it affected the adherence to

the higher cog criteria. OK MAE 02/04/2008

"B" is not plausible: What information in the stem would lend credibility

to this distractor. It is very basic that there is an auto isolation ofthe surge

tank. It is not enough to simply test whether an auto isolation exists. I

agree with the plausibility that you have built into the other two distrators.

Is there any way to improve this distractor by requiring the applicants to

know a little more than whether or not an auto isolation exists?

"B" replaced. MAB 02/04/2008

Does "C" contain grammatical errors in both sentences?

Fixed. MAB 02/04/2008

"D": when possible, always word questions and answers for what is

required to be done, not what an operator will or may do. This is because

operators may do anything, but we want to test what they are required to

do.

Revised. OK MAE 02/04/2008

52

076A2.02

N

H

2

y

Typo in second bullet. Fixed. MAE 02/0412008

S

Is there enough information in the stem to elicit the correct answer?

During the review in Atlanta we will need to pull prints and do a detailed

review of the information in the stem, detennine if the stem permits

applicants, or forces applicants to make assumptions on the location of the

.j(

leak, on how and where the leak is isolated, and whether there are credible

"

arguments for no correct answers or mnltiple correct answers. Plausibility

ofthe distractors will also need to be discussed.

OK. We pulled prints during IP and question is sat. MAB 02/04/2008

This question will be rated as unsat, pending the detailed review that will

take place with the licensee.

Q OK MAB 02/04/2008

53

076A4.02

M

F

2

E

Is there an extra space between "following" and "the"?

Q simplified. Corrected. MAE 02/04/2008

S

"A": Would it be more plausible for I-FCY-67-146 to be "Auto" and 2-

FCY-67-146 to be "Manual"? This qnestion is being asked because on the

surface it may make sense for the valve on the unit with the SI to auto

reposition, rather than the other unit's valve? This may be due to my

unfamiliarity with SQ. Discuss with licensee.

Corrected. MAB 02/04/2008

Is there any possibility that EA-67-1 allows operators to reposition O-FCY-

Page 15 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KiA#

B

L

L

Psychometric Flaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q=

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KiA

Only

S

Dist

Dist

B/W

67-152, thus bringing into question the possibility that Manual would be

the correct response for all three valves?

Q revised. Corrected. MAB

02/04/2008

The stem contains a lot of words. Are we simply asking the following:

Which one ofthe following correctly describes the following valve

responses to a Unit I safety injection?

0-FCV-67-152

I-FCV-67-146

2-FCV-67-146

A. Auto repositions

Auto repositions

Does NOT auto reposition

B. etc.

Incorporated, OK MAB 02/04/2008

54

078K3.01

M

F

I-

S

Question is right at the cusp ofbeing acceptable. When all other changes

2

to the exam have been made, an overall evaluation ofthe exam will be

performed. Q is OK. MAB 02/04/2008

55

103A3.01

M

H

I-

X

g

"C" and "D" plausibility: There are no indications in the stem that would

2

lead an applicant to believe that CVI should only have occurred on one

S

train. Are rad monitors train specific for CVI? If so, add values for both

the "A" and "B" monitors, with the "B" at a lower value.

Specific rad monitor information added. OK MAB 02/04/2008

56

011K6.05

N

H

2

?

g

Be consistent with periods after bullets. Fixed. 02/04/2008

S

'f

What credible misconception would lead an applicant to believe that I-LT-

68-321 would have an impact on pzr level control when I-LT-68-320 is

I

S

selected?"

Licensee revised answer choices to correct. OK MAB 02/04/2008

AJ:e the cold cal instruments ever used for pzr level control?

Cold Cal instruments deleted from answer choices. OK MAB 02/04/2008

57

015K2.01

M

F

I-

x

Y

"B" and "C" are not plausible: These two choices can be eliminated just

2

by knowing that even channels are powered by the same bus and the odd

S

channels are powered from the same bus (or at least the same division of

power). The mixing of even and odd NI numbers make these two

distractors not plausible.

Distractors revised to correct concem. OK MAB 02/04/2008

58

016K1.10

M

F

2

S

Q is SAT.

59

o17K4.03

B

F

I

x

Y

Remaining "in" limits, or "within" limits? Either way - it just depends on

how you want your applicants to read the question. Fixed. MAB

S

02/04/2008

What does "limits" mean in the stem? Is this specific enough to elicit the

Page 16 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KJA#

B

L

L

Psychometric Flaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q=

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KJA

Only

S

Dist

Dist

BIW

correct answer? I understand what it means only by reading the question

analysis, which the applicants will not have. Wording enhancements

made. OK MAE 02/04/2008

The question should also be tied to the procedure. Incorporated. MAB

02/04/2008

"C" and "D" are not plausible. The magnitude of these two answer choices

make them completely non-credible.

Distractors revised. OK MAB 02/04/2008

Are there any other choices that have meaning at your plant? 600F?

700F? nOF? 750F? Different values were agreed upon with licensee.

OK MAE 02/04/2008

60

045K5.17

N

H

I-

x

Y

"A" is not plausible. This is not a method which is directed by plant

2

procedures, which does not create a plausible distractor.

S

Qand distractor revised to address concem. OK MAE 02/04/2008

"D" is not plausible. Two variables, the two parameters being analyzed,

moving is not plausible. Q and distractor revised to address concem. OK

MAB 02/04/2008

This question is pure GFE. Applicants have already passed a GFE. This is

the Site Specific written exam. Steam header pressure incorporated, which

makes the question more plant specific. OK MAB 02/04/2008

.

Will the correct answer be correct under all plant conditions that can be

assumed with the information provided in the stem? To be safe, does a

bumup need to be provided in the stem as well? Answer will always be

correct at 50% power. OK MAB 02/04/2008

This question can be brought to an acceptable level by making it plant

specific. Maybe iterating on "B" and "C" and then adding a second half to

the distractors would accomplish plausibility and allow for a plant specific

question. Qrevised. OK MAB 02/04/2008

61

055A3.03

N

H

2

x

g

"C": lacks a period. Fixed. MAB 02/04/2008

S

"B" is not plausible. The reason in "B" is not tied to conditions that are

provided in the stem. Compare to "A" - where "A" contains a reason that

corresponds to an alarm that is provided in the stem. To raise the

plausibility of"B", the reason needs to be tied to a condition in the stem.

Simplified to only tie to high pressure, vice rad inst malfunction. OK

MAE 02/04/2008

Page 17 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KlA#

B

L

L

PsvchometricFlaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q~

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KIA

Only

S

Dist

Dist

B/W

62

068A4.02

M

F

2

S

Q is SAT. TIle chosen wording does not appear to be the easiest to

interpret, but the Q is OK ifyou want to go with the current wording. If

you would like your applicants to see this question worded slightly

different, I am OK with that too.

OK MAB 02/0412008

63

071K3.04

M

H

2

S

Q is SAT.

64

075G2.2.1 I

N

H

2

g

Grammar issue in first bullet.

Q replaced. OK MAB 02/04/2008

S

The stem ofthe question is vague with respect to how the design will be

changed. It is implied, that the change will cause the valve to

automatically close. Is it important to state this. Will it be possible for an

applicant to assume a change that would affect the answer choices?

Q replaced. OK MAB 02/04/2008

Do you want to ask this question to all RO? Do you have ally RO learning

objectives associated with temp changes? Is this knowledge part of the RO

ILT program? Discuss with licensee.

Q replaced. OK MAB 02/04/2008

If licensee can produce documentation that this is OK to ask an RO, then

the question is SAT.

Q replaced. OK MAB 02/04/2008

65

086AI.OI

N

F

'5.

x

Y

Answer choices need some "the'ts added between "trip" and "pump".

Qrevised. OK MAB 02/04/2008

S

KIA not matched: The KIA requires testing the ability to monitorlpredict

changes in parameters as they relate to operating controls to prevent

exceeding design limits (fire header pressure). This question only tests

knowledge of existence of design features. The question does not test the

ability to monitor changes in parameters to prevent from exceeding design

limits.

Q revised. OK MAE 02/04/2008

66

G2.I.3

N

F

2

S

Question is written as a NOT question, which is discouraged by the

NUREG. I will allow this format ifthe licensee does not have an issue

with presenting the question to the applicants in this format.

Noted. MAB 02/04/2008

Repeated the word "during" in the stem. Fixed. MAE 02/0412008

67

G2.I.27

B

H

2

S

Third bullet: "start" should be plural. Fixed. MAB 02/04/2008

Page 18 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KiA#

B

L

L

Psychometric Flaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q-

SRO

E

Explanation

N

K

D

Focns

Cred

Cred

KiA

Only

S

Dist

Dist

B/W

Fourth bullet: "level" should be plural. Fixed. MAB 02/04/2008

Be consistent with tense in all answer choices. Consider:

A.

Arming conditions for AMSAC were not present.

B.

AMSAC actuated.

C.

Arming conditions were present, but actuation conditions were

not present.

D.

AMSAC has not actuated, but will actuate after the appropriate

time delay if SG levels stabilize at their current values.

Fixed. MAB 02/04/2008

68

G2.1.28

M

F

2

x

.g

"C" and "D" plausibility: ERCW pumps are the same type ofpump

performing the same function.

If an applicant had a misconception that

S

they were both sequenced on the bus, why would it make any difference

which pump starts first? Are there other pumps in the plant that both get

sequenced on a bus and the order of that sequence is determined by a

switch position that is manipulated by the operators? Discuss with

licensee. Ifthere is more plausibility here than I realize, then this question

may be SAT.

Qreplaced. OK MAB 02/04/2008

"C' and "D" should have an "in which" added.

Qreplaced. OK MAB 02/04/2008

The second part of"A" and "C" appears to be a little cryptic. Is this easily

understandable?

T

Q replaced. OK MAB 02/04/2008

69

G2.2.26

N

H

2

S

Qis SAT.

REF

70

G2.2.33

B

H

2

B

Is there an extra space between "and" and "the"? Corrected. MAB

02/0412008

S

"B" is not plausible. With dumps open and rods inserting it is not credible

for an applicant to have a misconception that temperature will go up.

Consider changing the temperature to something lower than 559 F, but

plausible. Answer choices changed to iterate on temps and speed. OK

MAB 02/04/2008

71

G2.3.2

N

H

2

S

Q is SAT.

72

G2.3.9

B

F

2

S

Be consistent with periods behind bullets. Fixed. MAB 02/04/2008

Q is SAT.

73

G2.3.l0

B

F

I

x

x

x

.g

"A" is not plausible. If"A" is correct, then any of the others would be

Page 19 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KlA#

B

L

L

Psychometric Flaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q~

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KIA

Only

S

Dist

Dist

B/W

also. TIle question asks for which would be correct to exit the RCA. If it

S

is correct to simply exit, then doing anything above and beyond that would

not be wrong. Q replaced. OK MAB 02/04/2008

"B" is not plausible. PCM-IB monitors alarm quite often. Can you

imagine how many whole body counts would be needed if this were true?

How many times have these applicants had a PCM-IB alarm?

Q replaced. OK MAB 02/04/2008

This question does not discriminate at the appropriate level. An RO

applicant getting tins question correct does not provide useful information

in making a license decision. Q replaced. OK MAB 02/04/2008

74

G2.4.16

B

H

2

S

Typo in "D": E-O? vice E-O. Fixed. MAB 02/04/2008

Typo "D": should "exist" be plural? Licensee failed to correct. It does not

affect tec1micalaccuracy ofquestion. I would make them change it if it

appeared only in a distractor. OK

MAB 02/04/2008

This question looks very familiar. No response needed from licensee - I

am just noting this. Noted. MAB 02/04/2008

75

02.4.22

N

F

2

S

Why is "Larger" capitalized in "A' and "D"? Corrected. MAB

02/04/2008

SROEXAM

76

008G2.4.49

NJH

2

II

"C": Is there an extra space between "and" and "immediately"?

~

Q and KIA changed. OK MAB 02/04/2008

S

"D": Is there an extra space between "in" and "E-O"?

Q and KIA changed. OK MAB 02/04/2008

What pressure causes phase B to actuate?

Would it be incorrect for the SRO to direct starting of the EDG? Is this an

automatic action that should have occurred? Does SQ have all Admin

procedure that states that it is permissible to manually perform an auto

action that should have occurred?

Q and KIA changed. OK MAB 02/04/2008

If this question is determined to require knowledge of procedure selection,

i.e. beyond general rules of procedure usage, then it will be acceptable as

an SRO question. Discuss SRO-only learning objectives that may be

available to support this question as SRO only.

Q and KIA changed. OK MAB 02/04/2008

It is my knowledge that a general Westinghouse rule of usage is that

Page 20 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KlA#

B

L

L

Psychometric Flaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q=

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KIA

Only

S

Dist

Dist

BIW

operators do not exit E-O until E-O instructs them to exit. I would view this

as RO knowledge unless there is some plant documentation that would

state otherwise.

Q and KiA changed. OK MAB 02/04/2008

77

029EA2.09

M

H

2

x

Y

Discuss deleting parameters at the time oftransition. They do not add

plausibility to "turbine not tripped"; therefore, they may not be necessary

S

information.

PRT values deleted. OK MAB 02/04/2008

Change feed water flow to something that is just over the limit. Like 120

gpm to each SG. Heat sink requirements are 440 gpm total. Discuss with

licensee.

FW flow values revised. OK MAB 02/0412008

Not SRO-only: ROs are required to know status trees. Therefore, the

question can be answered by knowing that H.l is not required to be entered

and that the turbine is tripped. Both of these knowledge items are required

RO-knowledge.

(G2.4.21 has an RO importance rating of 3.7)

Q revised. OK MAB 02/04/2008

78

054AA2.05

N

H

2

x

Y

Not SRO-only: Question requires systems knowledge for response ofthe

MFW B/P Reg Valve, which is RO knowledge. Question also requires

S

knowledge ofAOP and EOP entry conditions, which is also RO

knowledge. Furthermore, the applicant can use systems knowledge to

I

determine that the reactor will not trip and that not SI is present, thereby,

allowing the applicant to eliminate going to E-O, "Reactor Trip or Safety

Injection."

(2.4.1 and 2.4.4 have RO importance ratings of4.3 and 4.0 respectively)

Q revised to make SRO only. OK MAB 02/04/2008

Are the applicants required to go to the AOP? Would an operator be

wrong if the AOP was not entered?

Q revised. OK MAB 02/04/2008

79

057AA2.17

N

H

2

x

y

Is punctuation in second bullet correct?

Q revised. OK MAB 02/04/2008

S

Not SRO-only: Both parts ofthe answer choices can be analyzed using

RO required knowledge. Systems knowledge is required by ROs;

therefore, this question does no require any knowledge that is specific only

to the SRO position.

Q revised. OK MAB 02/04/2008

80

065AA2.01

N

H

2

E

Wording on LCO 3.0.3 is too loose. LeO 3.0.3 is always applicable and

Page 21 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KiA#

B

L

L

Psychometric Flaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q=

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KiA

Only

S

Dist

Dist

BIW

licensees are always required to comply with 3.0.3. Change the wording

S

to: Required Actions ofLCO 3.0.3 are required to be performed, OR not

required to be performed. This will not change the meaning of what is

being asked, but it will be more direct and more technically correct to

phrase the second part of each answer choice in this manner.

Incorporated. MAB 02/04/2008

Delete the air pressure in the stem. The ala1111 annunciates, which is

enough to inform the operator that pressure is below 68 psig. Discuss with

licensee. Allowed air pressure to remain. OK MAB 02/0412008

The piece of each answer choice that discusses that fuel movement is

required to be suspended does not add value since it is the same in each

answer choice. The answer choices should only contain the information

needed to make them unique answer choices:

A.

ABGTS Train A remains OPERABLE until Train A

Containment Air Isolation Valve automatically closes, at which

time LCO 3.0.3 required actions would NOT be required to be

taken.

B.

ABGTS Train A remains OPERABLE until Train A

Containment Air Isolation Valve automatically closes, at which

time LCO 3.0.3 required actions would be required to be taken.

C.

Both trains of ABGTS would immediately be INOPERABLE

with the current conditions.

LCO 3.0.3 required actions would

NOT be required to be taken.

D.

Both trains of ABGTS would immediately be INOPERABLE

with the current conditions.

LCO 3.0.3 required actions would

be required to be taken

Incorporated. OK MAB 02/04/2008

81

W/Ell

B

H

I-

x

X?

B

Be consistent with punctuation after bulleted items.

Fixed. MAB

G2.4.48

2

02/04/2008

S

Transfer to RHR containment sump is not plausible. The stem clearly

states that a LOCA Outside Containment is occurring. This distractor must

be replaced. Corrected. OK MAB 02/04/2008

Is there a way to provide some indications in the stem that are indicative of

a LOCA outside containment without telling them that the operators are in

ECA-1.2 due to a WCA in the Aux Bid. Is there a less obvious way to

provide indications ofabnormal radiation in the aux building - i.e. and

ala1111? Containment sump level added. OK MAB 02/04/2008

The easiest fix for this question may be to use the two best answer choices

and then iterate on operator actions, etc. I.E. Iterate on ECA 1.I and E- I

AND then operator actions. Incorporated. MAB 02/04/2008

Page 22 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KlA#

B

L

L

Psychometric Flaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

TIF

1 Non

>1 Non

Partial

Min

Q=

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KIA

Only

S

Dist

Dis!

B/W

-

Another possible fix may be to test procedure path for two transitions.

Operators would go to ECA-I.I, then to ...

Distractors revised. OK MAB 02/0412008

82

W/EI2

B

H

2

x

E

Questions testing knowledge of what operators "should" do are too

G2.I.32

ambiguous to ask. Questions must ask what operators are required to do.

S

This may just be a phrasing issue with the question statement, but

questions need to test requirements.

Corrected. OK MAB 02/0412008

Distractor "B": Not plausible because there is not a credible

misconception that could lead an applicant to stop terminating SI but

remain in the same procedure. At least with the procedure transition they

need to evaluate ifthey are to stop the SI termination in order to make the

transition. Corrected. MAB 02/04/2008

Modify the stem slightly to place the operators at Step 14 where they are

monitoring for SI termination criteria and provide them the criteria that are

indicative of them proceeding to step 15. Answer choices could be

something like:

A.

Terminate SI in ECA-2. I, then transition to E-2

B.

Transition to E-2, then terminate SI

C.

Remain in ECA-2. I. SI termination criteria are not currently

met.

D.

Transition to E-2, SI termination criteria are not currently met.

Discuss this option with licensee.

Incorporated. OK MAB 02/04/2008

83

003G2.2.22

N

F

I

x

x

.y

Can the stem state that the control rod drops to the middle ofthe core?

Otherwise, a rod dropping to the bottom makes "B" non-plausible because

S

there would not be any axial concerns for a rod that falls to the bottom.

Added. OK MAB 02/04/2008

"D" is a correct statement and could successfully be argued as correct by

an applicant. The accident analysis will remain valid at 75% power.

Corrected. MAB 02/0412008

Is there a more specific option to use for "A"? Any reactivity 1power

redistribution issue is going to be a fuel integrity concern.

"A" allowed to remain. OK MAB 02/04/2008

A more specific choice for "A" and replacement of"D" could result in a

satisfactory question.

"D" revised and "A" allowed to remain with the

other changes made to the question. OK MAB 0210412008

Page 23 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KiA#

B

L

L

Psychometric Flaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q=

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KiA

Ouly

S

Dist

Dist

B/W

84

005AA2.03

N

H

2

X

X

.y

Delete "causing a runback from the stem".

Applicants should have

enough information with the plant at 86% and a MFP trip to understand

S

that a runback will occur. Discuss with licensee to ensure that this is the

case.

Deleted. OK MAB 02/04/2008

Is second bullet worded corrected?

Corrected. MAB 02/04/2008

Not SRO-only knowledge: ROs are required to know reactor trip criteria.

Q revised and allowed for SRO due to location oftrip criteria. MAB

02/04/2008

Is "D" a subset of"C"? Is (ripping the reactor a means of removing the

Unit from service within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />? This may be able to be alleviated by

changing the wording of the question to ask for the specific requirements

as stated in AOP-C.OI. Corrected. MAB 02/0412008

85

051AA2.02

M

H

2

X

.y

Is second bullet worded correctly? Corrected. MAB 02/04/2008

S

Delete all unnecessary information in answer choices. In other words,

delete the information that is not needed to make the answer choices

unique.

All ofthe extraneous procedure entry information is not needed to

make the answer choice unique. I.E.:

A.

Manual turbine trip criteria is currently met.

B.

Manual reactor trip criteria is currently met.

C.

Manual turbine trip criteria will be met ifcondenser pressure

I

exceeds 2.7 psia and cannot be restored within 5 minutes.

D.

Manual turbine trip criteria will be met ifcondenser pressure

exceeds 2.7 psia and cannot be restored within 5 minutes.

Extra info deleted from answer choices. MAB 02/0412008

Question should be worded in the plural fonn. Currently it is worded for

singular (or plural), but each answer choice has more than one item.

Corrected. MAB 02/0412008

Not SRO-only: Reactor Trip criteria is RO knowledge. The above

comments will be irrelevant unless the SRO-only issue is corrected.

(G2.1.7 and G2.4.l have RO IRs of3.7 and 4.3 respectively)

Allowed for SRO exam due to knowledge of being able to stay in AOP to

address vacuum problem for 5 minutes. MAB 02/04/2008

86

W/E02

N

H

I

x

.y

Should "Safety" be capitalized in second bullet? "Injection" is also now

EA2.2

capitalized. OK MAB 02/04/2008

S

"B" and "D": This reviewer does not understand how the conditions in the

Page 24 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KlA#

B

L

L

Psychometric Flaws

Content Flaws

V

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q~

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KIA

Only

S

Dist

Dist

B/W

stem result in LCO 3.0.3 being plausible. There is not a reasonable

misconception that would lead an applicant to thinking that LCO 3.0.3.

Corrected. MAB 02/04/2008

"C" and "0": Nothing has really occurred in the stem except for an

inadvertent SI. There is no reasonable misconception that would lead an

applicant to E-I for a LOCA.

Condition in the stem revised and distractors changed. OK.MAB

02/04/2008

TIle lack of plausibility in the distractors results in an LOD= I, which does

not allow this question to discriminate between a competent and less than

competent SRO. Q revised to bring to acceptable level. OK MAB

02/0412008

87

W/EI6

M

H

2

x

B

Can "The reactor is in Mode 6 with" be deleted from first bullet?

G2.2.31

2

Deleted. MAB 02/0412008

S

Not SRO-only: ROs are licensed to move fuel and therefore are required

to know how to handle a loss ofrefueling water event.

TIns is snpported

by KIA 036AAI.04, which has an RO IR of 3.7. Lowering water level is a

fuel handling incident, which is supported by AOP-M.04, Refueling

Malfunctions.

See comment below. OK MAB 02/0412008

This was a modified question. TIle reviewer would like to see a copy of

the source question, from which this one was modified. Provided. MAB

02/0412008

Do ROs currently move fuel at SQ? Ifnot, when was the last time an RO

moved irradiated fuel at SQ?

Is there an SRO-only leaming objective to

support tins being SRO-only knowledge? Based on the above reasoning

tins falls into the category of an RO question; however, ifsufficient

justification can be provided it may be permissible to allow this on the

SRO exam.

Licensee provided sufficient justification for SRO only level. MAB

02/04/2008

88

008A2.09

M

H

2

x

y

Reactor Physics and systems knowledge are the only requirements for

answering this question. Plant response to a controller failure is systems

S

knowledge that is required of an RO. Determining whether a temp change

adds positive or negative reactivity is basic GFE reactor physics

knowledge. This question can be answered only by knowing GFE

knowledge. No SRO-only knowledge is required to answer this question.

Q replaced. OK MAB 02/04/2008

89

0IOG2.4.38

N

F

I

x

y

"A" and "0": 5 minutes is not plausible. Leading to a LOD

I.

Page 25 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KlA#

B

L

L

Psvchometric Flaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q=

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KIA

Only

S

Dist

Dist

B/W

Q revised to address concern. OK MAE 02/0412008

S

Question LOD would be acceptable if the acceptable ODS notification

requirement is tested, instead ofthe 15 minute to declare. Test whether the

requirement to notify ODS is 5 minutes from the event or 5 minutes from

making the declaration. This will test knowledge of whether the ODS

notification is required to be made prior to or after event declaration.

Incorporated. OK MAB 02/0412008

90

013A2.05

N

H

2

x

Y

Question is not SRO-only: Can this question be answered using only

systems knowledge?

The first piece of each answer choice can be

S

answered by knowing what the cause ofthe condition could be, which is

systems knowledge. This limits the potential answer choices to "C" and

"D" using RO knowledge. Applicants can also determine that the pumps

will not start manually based on the physical configuration of the plant, I.E.

systems knowledge. Therefore, this question can be answered by an

applicant without needing to use any SRO-only level knowledge.

Concerns addressed. Distractors and stem revised. OK MAB 02/04/2008

91

103G2.2.l4

N

F

2

S

Tie the second halfof the question to the procedure just as you did with

when Containment Closure Control is required to be implemented. I.E.

...who will maintain the listing ofthe Containment Closure Exceptions in

effect in accordance with 0-GO-15.

Incorporated, MAB 02/04/2008

92

029G2.4.46

N

H

3

x

x?

E

Question is backward logic. This is discouraged by NUREG-I 021;

,

1

however, it is not prohibited. Licensee does not need to address this

comment if they are satisfied with their applicants receiving this question.

S

Noted. MAB 02/04/2008

Can "B" be eliminated using systems knowledge? Will ABI result in an

auto shutdown of Unit I containment purge when ORA-90-10IA alarms

with Unit I Lower Containment Purge in progress? Discuss with licensee.

This will determine the status of the question.

ABI will not auto SID UI purge. After discussion with licensee, Q is OK.

MAB 02/0412008

93

034A2.02

N

F

2

x

E

"B": Rad Control Manager is not plausible because this is not an irradiated

fuel bundle. Contamination and exposure should not be a concern.

S

Fixed. MAB 02/0412008

Consider the following changes:

. Per AOP-M.04, which one ofthe following correctly describes the

lowest level ofapproval required for approval ofrecovery instructions?

A.

Refueling SRO

B.

Shift Manager

Page 26 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KlA#

B

L

L

Psychometric Flaws

Content Flaws

U

Comment

M

0

0

Stem

Cnes

T/F

1 Non

>1 Non

Partial

Min

Q~

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KIA

Only

S

Dist

Dist

B/W

C.

Operations Manager

D.

Plant Manager

Incorporated. OK MAB 02/04/2008

94

G2.1.12

N

H

2

S

Is second bullet worded correctly? Fixed. MAB 02/04/2008

REF

Be consistent with periods after bullets. Fixed. MAB 02/04/2008

95

G2.1.33

N

H

2

x

y

KIA Match: The KIA requires that tech spec entry conditions are tested.

This question skips that part and then tests the actions that are required

S

once the tech spec is entered.

Q revised. OK MAB 02/0412008

TIle stem does not even state that fuel is being moved; therefore, stopping

fuel movement does not appear like a reasonable answer.

Answer choices revised. OK MAB 02/05/2008

Question is disjointed. "A" and "B" are testing knowledge ofmode change

requirements and "C" and "D' are testing knowledge of fuel movement

requirements. This is not the reason the question is unsat, but simply an

observation.

Answer choices revised. OK MAB 02/0512008

96

G2.2.8

B

F

2

.g

Consider wording the Q as follows:

Which one ofthe following correctly describes the MINIMUM required

S

qualifications for the person(s) PREPARING the safety evaluation

I

paperwork in accordance with SPP-9.4, IOCFR50.59 Evaluations of

Changes, Tests, and Experiments?

Incorporated. OK MAB 02/0512008

97

G2.3.l

B

H

2

.g

The topic and construction of the question is satisfactory, There are

concems with the wording ofthe "Why" column choice for "A" and "B".

S

Where is "maintain critical safety function" defined? Would it be wrong

for an applicant to believe that the emergency exposure would be needed to

prevent the conditions from elevating beyond Yellow? Discuss with

licensee.

Q replaced. OK MAB 02/05/2008

98

G2.3.6

M

F

2

x

.g

Tie the question to the procedure, I.E.: Which one ofthe following . ....

in accordance with "procedure name and number"?

S

Incorporated. OK MAB 02/05/2008

Be a little more precise with the first piece of each answer choice. I.E.

Approval not permitted. I Approval is permitted.

The above suggestion is a little more accurate because the SRO could just

choose to not sign it, which is neither disapproving or approving. The

Page 27 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KiA#

B

L

L

Psychometric Flaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q=

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KiA

Only

S

Dist

Dist

BIW

above wording covers all cases and speaks directly to the procedure

requirement.

Incorporated. OK MAB 02/05/2008

Delete the last piece of"D": ", but dilution flow requirements are raised

due to the higher activity."

This really does not add to plausibility because

it is not needed to make the answer choice unique. If an applicant knows

whether the SM is required to approve, then this extraneous information is

not meaningful.

Incorporated. OK MAB 02/05/2008

"B" is not plausible only because ofthe verbiage. There may be some

improper grammar, which is easily fixed. I.E.:

B.

Approval not permitted. Cannot release monitor tank until 0-

RM-90-122 has been retnmed to OPERABLE status.

Incorporated. OK MAB 02/05/2008

What does "two independent discharge valve lineups" mean? Wording

must be precise and reflect exactly what the procedures require. Do two

lineups need to be performed? Is one lineup performed and then it is

independently verified?

Answer choices modified. OK MAB 02/05/2008

ODCM states that two qualified staffmembers independently verify

release rate calculations. The answer choices in the questions states that 2

release rate calculations are verified. I am not sure that these requirements,

as stated, are exactly the same. Discuss with licensee.

,

Answer choices modified. OK MAB 02/05/2008

99

G2.4.9

B

H

2

x

x

lei

Not SRO-only: Knowing how to recognize pump cavitation and the

actions to take to mitigate the cavitation is RO required knowledge.

S

Knowing that dilution is not permitted is also RO required knowledge.

All I hour and less tech specs are RO knowledge.

Equipment protection actions are also RO knowledge.

Through discussion with licensee, CE allowed Qto remain. OK MAB

0210512008

There are also plausibility concerns with taking suction from VCT with

boron too low. This point is inconsequential due to the question not being

written at the SRO level.

Through discussion with licensee, CE allowed distractors to remain. OK

MAB 02/05/2008

100

G2.4.49

N

H

2

x

lei

"Shutdown Boards Energized" is not an action, it is a statement of fact. -

Similar comment for "Safety Injection Actuated".

S

Qreplaced. OK MAB 02/05/2008

Page 28 of29

ES-401, Rev. 9

Written Exam Review Worksheet

Sequoyah 2008-301

Form ES-401-9

Q#

KiA#

B

L

L

PsychometricFlaws

Content Flaws

U

Comment

M

0

0

Stem

Cues

T/F

1 Non

>1 Non

Partial

Min

Q~

SRO

E

Explanation

N

K

D

Focus

Cred

Cred

KiA

Only

S

Dist

Dist

B/W

Not SRO-only: Knowing whether the status ofthe reactor and turbine is

systems knowledge, which is a required RO knowledge item. Knowing

that upon a reactor trip that E-Ois entered is an RO knowledge item. This

is all that is needed to arrive at the correct answer.

Qrevised/replaced to test SRO-only knowledge. OK MAB 02/05/2008

Page 29 of29

ES-403

Written Examination Grading

Quality Checklist

Form ES-403-1

Facility:

~E('OUD\\(MA

Date of Exam: OJJoO ~B

Exam Level: ROIl SRolro

Initials

Item Description

a

b

c

1.

Clean answer sheets copied before grading

1JK.

NfIJ

Ifff3

2.

Answer key changes and question deletions justified

?Jk.

flJIA

f}$

and documented

3.

Applicants' scores checked for addition errors

sc

~

~

(reviewers spot check> 25% of examinations)

A

4.

Grading for all borderline cases (80 +/-2% overall and 70 or 80,

?1H.

I'k

m>

as applicable, +/-4% on the SRO-only) reviewed in detail

/~

5.

All other failing examinations checked to ensure that grades

~

I~

rrfJ

are iustified

6.

Performance on missed questions checked for training

~

~

n'1O

deficiencies and wording problems; evaluate validity

.~

of Questions missed by half or more of the applicants

Printed Name/Signature

Date

a. Grader

~R.\\AN{) ~~1§.UdtL

z/I er!fJt

b. Facility Reviewer(*)

N)A

.

N;/4

c. NRC Chief Examiner (*)

M"", A,B~I;3,1//2i/}£tp

r:~I.l..ItJ.//J06'el

d. NRC Supervisor (*)

/l.)jJ..UJJLJJ T lVfDj,).AA/A/ /

!1iJjJAfJft~

ozl'l/ItJ?

r

} {

(*)

The facility reviewer's signature is not applicable for ex~ations graded by the NRC;

two independent NRC reviews are required.

ES-403, Page 6 of 6

ES*S01

Post-Examination Check Sheet

Form ES-S01-1

Post-Examination Check Sheet

Facility:

Sf::: (QU 0\\{VtIf

Date of Examination: -:Yt~u.e.,*.'(

0<005

Task Description

Date Complete

1.

Facility written exam comments or graded exams received

();;'/Itt!JDG ~

and verified complete

2.

Facility written exam comments reviewed and incorporated

()J./1'-/J;)C'Cf C;;

and NRC grading completed, if necessary

3.

Operating tests graded by NRC examiners

O?- ) ILl)Jtr/?

4.

NRC chief examiner review of operating test and written exam

OJ!!41;}or/~

grading completed

5.

Responsible supervisor review completed

O;Z I;{d;)C)O C?

6.

Management (licensing official) review completed

o,,:2/;;qIJc;l1} ~

7.

License and denial letters mailed

o2);) JdtJ{)~

8.

Facility notified of results

o;;;./~ J/?CJJ'?,

jJ:i

9.

Examination report issued (refer to NRC MC 0612)

os .' :<oeJg'

10.

Reference material returned after final resolution of any appeals

Aliff

ES-501, Page 23 of 25

Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000

Confidential information submitted

under 10 CFR 2.390

February 13, 2008

10 CFR 55.40

Dr. William D. Travers

Regional Administrator, Region II

U.S. Nuclear Regulatory Commission

Sam Nunn Atlanta Federal Center

61 Forsyth Street, SW, Suite 23T85

Atlanta, Georgia 30323-8931

Attention: Mr. M. T. Widmann

In the Matter of

Tennessee Valley Authority (TVA)

Docket Nos.

50-327

50-328

SEQUOYAH NUCLEAR PLANT (SQN) - REACTOR AND SENIOR REACTOR

OPERATOR INITIAL EXAMINATIONS - 05000327/2008301 AND 05000328/2008301

In accordance with Examination Standard (ES) 501, "Initial Post-Examination

Activities," of NUREG-1021, "Operator Licensing Examination Standards for Power

Reactors," SON is providing the following information: written examination, examination

answer key, ES 401-8, examination cover sheets, seating chart, student answer

sheets, and student clarifying questions.

In accordance with 10 CFR 55.49, "Integrity of Examinations and Tests," and

NUREG-1021, appropriate measures have been taken to ensure examination integrity

and security. The Examination Security Agreement Form ES-201-3 will be provided

following the post-examination signatures.

Because of the administratively confidential nature, it is requested that the information

contained in the enclosure be withheld from public disclosure in accordance with

10 CFR 2.390(a)(6). This letter contains no new commitments. If you should have any

questions, please contact me at (423) 843-7170.

S.inc.e.relY,. JI

.. ~

_~~Cff-------

.~;:::;?'-

J

,~ .. '~ames D. Smith

Manager, Site Licensing and

Industry Affairs

Enclosures

Printed on recycled paper

Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000

December 5, 2007

Dr. William D. Travers

Regional Administrator, Region II

U.S. Nuclear Regulatory Commission

Sam Nunn Atlanta Federal Center

61 Forsyth Street, SW, Suite 23T85

Atlanta, Georgia 30323-8931

Attention: Mr. M. T. Widmann

In the Matter of

Tennessee Valley Authority (TVA)

Docket Nos.

50-327

50-328

(

(

SEQUOYAH NUCLEAR PLANT (SQN) - REACTOR AND SENIOR REACTOR

OPERATOR INITIAL EXAMINATIONS - 05000327/2008301 AND 05000328/2008301

This letter transmits the requested information identified in NRC's letter to

William R. Campbell dated August 3,2007, for the examinations to be administrated the

weeks of January 28, 2008, and February 4, 2008.

There are no commitments contained in this submittal. In accordance with 10 CFR 55.49

and NUREG 1021, "Operator Licensing Examination Standards for Power Reactors,"

appropriate measures have been taken to ensure examination integrity and security.

Accordingly, it is requested that this letter and the enclosed documents be withheld from

public disclosure until the examinations are completed.

TVA's principal contact regarding the license examinations is Tom Jones, SON Operations

Training. Should you require additional information regarding this matter, please contact

Mr. Jones at (423) 843-4206 or contact me at (423) 843-7170.

Sincerely,

w.?~

James D. Smith

Manager, Site Licensing and

Industry Affairs

Enclosure

Printed on recycled paper

(

(

U.S. Nuclear Regulatory Commission

Page 2

December 5, 2007

JWP:KTS

cc:

L. E. Nicholson, BR 4X-C

T. D. Wallace, STC 2H-SQN

B. A. Wetzel, BR 4X-C

EDMS, WT CA-K

The information contained within this document is the Property of the Tennessee

Valley Authority and has been determined to be sensitive. Any further distribution of

its contents will be on a need to know basis only as determined by the originator of

the document or the recipient.

SENSITIVE INFORMATION

I:License\\Operator license\\2007\\Requested information IR2008301

(

(

ENCLOSURE

TENNESSEE VALLEY AUTHORITY

SEQUOYAH NUCLEAR PLANT (SQN)

UNITS 1 AND 2

OPERATING EXAMINATIONS FOR REACTOR OPERATOR (RO)

AND SENIOR REACTOR OPERATOR (SRO) CANDIDATES

Written Examination - RO and SRO Portions Including Student Reference Material

Question Development Reference Material for RO and SRO Written Examinations

Job Performance Measures for RO and SRO examinations

Four Simulator examinations

ES-201-3 - Examination Security Agreement

ES-301-2 - Control Room/In-Plant Systems Outline

ES-301-3 - Operating Test Quality Checklist

ES-301-4 - Simulator Scenario Quality Checklist

ES-301-5 - Transient and Event Checklist

ES-301-6 - Competencies Checklist

ES-401-6 - Written Examination Quality Checklist

(

Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000

October 23, 2007

Dr. William D. Travers

Regional Administrator, Region II

U.S. Nuclear Regulatory Commission

Sam Nunn Atlanta Federal Center

61 Forsyth Street, SW, Suite 23T85

Atlanta, Georgia 30323-8931

Attention: Mr. M. T. Widmann

In the Matter of

Tennessee Valley Authority

Docket Nos.

50-327

50-328

(

(

SEQUOYAH NUCLEAR PLANT - REACTOR AND SENIOR REACTOR OPERATOR

INITIAL EXAMINATIONS - 05000327/2008301 AND 05000328/2008301

As requested by NRC letter to TVA dated August 3,2007, this letter transmits the

examination outlines identified in NRC's letter to William R. Campbell dated August 3,

2007, for the examinations to be administrated the weeks of January 28, 2008 and

February 4, 2008.

There are no commitments contained in this submittal. In accordance with 10 CFR 55.49

and NUREG 1021, "Operator Licensing Examination Standards for Power Reactors,"

appropriate measures have been taken to ensure examination integrity and security.

Accordingly, it is requested that this letter and the enclosed documents be withheld from

public disclosure until the examinations are completed.

Please direct questions concerning this issue to me at (423) 843-7170.

~rzJ.~

Glenn W. Morris

Manager, Site Licensing and

Industry Affairs

Enclosure

Printed on recycled paper

(

ENCLOSURE

TENNESSEE VALLEY AUTHORITY

SEQUOYAH NUCLEAR PLANT (SQN)

UNITS 1 AND 2

The following are included in this enclosure:

License Examination Outlines:

ES-201-2 Examination Outline Quality Checklist

ES-201-3 Examination Security Agreement

ES-301-1 Administrative Topics JPM Outlines for RO and SRO exams

ES-301-2 Control Room/In-Plant Systems JPM Outlines for RO and SRO exams

ES-301-5 Transient and Event Checklist

ES-D-1 Simulator Scenario Outlines for 4 scenarios

ES-401-2 and 3 Written Exam Outlines for RO and SRO exams

ES-401-4 Record of Rejected KlAs for RO and SRO exams

Written Exam development methodology statement

Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000

August 15,2007

Dr. William D. Travers

Regional Administrator, Region II

U.S. Nuclear Regulatory Commission

Sam Nunn Atlanta Federal Center

61 Forsyth Street, SW, Suite 23T85

Atlanta, Georgia 30323-8931

Attention:

Mr. R. C. Haag

In the Matter of

Tennessee Valley Authority

Docket Nos.

50-327

50-328

(

SEQUOYAH NUCLEAR PLANT - REACTOR AND SENIOR REACTOR OPERATOR

INITIAL EXAMINATIONS - 05000327/2008301 AND 05000328/2008301

As requested by Mark Bates of your staff, this letter transmits the written examination

outlines identified in NRC's letter to William R. Campbell dated August 3, 2007, for the

examinations to be administrated the week of January 28, 2008.

Due to the administratively confidential nature of the enclosure, it is requested that the

information contained in the enclosure be withheld from public disclosure until after the

examinations are complete.

Please direct questions concerning this issue to me at (423) 843-7170.

~ZuN.~

Glenn W. Morris

Manager, Site Licensing and

Industry Affairs

Enclosure

Printed on recycled paper

(

u.s. Nuclear Regulatory Commission

Page 2

August 15, 2007

JWP:KTS

cc:

R. H. Bryan, BR 4X-C

T. D. Wallace, STC 2H-SQN

EDMS, WTC A-K

The information contained within this document is the Property of the Tennessee

Valley Authority and has been determined to be sensitive. Any further distribution of

its contents will be on a need to know basis only as determined by the originator of

the document or the recipient.

SENSITIVE INFORMATION

I:License\\Operator license\\2007\\Exam outline IR2008301

ENCLOSURE

TENNESSEE VALLEY AUTHORITY

SEQUOYAH NUCLEAR PLANT (SQN)

UNITS 1 AND 2

LICENSE WRITTEN EXAMINATION OUTLINES