{{#Wiki_filter:QF1075-01 Rev. 5 (FP
{{#Wiki_filter:QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
JOB PERFORMANCE MEASURE (JPM)
SITE:
MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
CONTROL ROD DRIVE EXERCISE JPM NUMBER:
CONTROL ROD DRIVE EXERCISE JPM NUMBER:
JPM-0074-00 2 REV. 0   RELATED PRA INFORMATION:
JPM-0074-002 REV.
None   TASK NUMBERS / TASK TITLE(S):
0 RELATED PRA INFORMATION:
None TASK NUMBERS /
TASK TITLE(S):
CR200.226 Respond to a drifting control rod K/A NUMBERS:
CR200.226 Respond to a drifting control rod K/A NUMBERS:
201003 A2.03 Rating: SRO/RO:
201003 A2.03 Rating: SRO/RO:
3.7/3.4 APPLICABLE METHOD OF TESTING:
3.7/3.4 APPLICABLE METHOD OF TESTING:
Discussion:
Discussion:
Simulate/walkthrough:
Simulate/walkthrough:
Perform:   EVALUATION LOCATION:
Perform:
In-Plant:   Control Room:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Simulator:
Other:           Lab:       Time for Completion:
Other:
Lab:
Time for Completion:
15 Minutes Time Critical:
15 Minutes Time Critical:
No     Alternate Path:
No Alternate Path:
Yes     TASK APPLICABILITY:
Yes TASK APPLICABILITY:
SRO:   RO:   NLO   Additional site
SRO:
-specific signatures may be added as desired.
RO:
NLO Additional site-specific signatures may be added as desired.
Developed by:
Developed by:
Developer Date   Validated by:
Developer Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator (See JPM Validation Checklist, Attachment 1)
Date   Approved by:
Date Approved by:
Training Supervisor Date QF1075-01 Rev. 5 (FP
Training Supervisor Date  
-T-SAT-75) Page 2 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 2 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 48: Line 59:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.  
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.  


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 3 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 3 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant is operating at 100% power. Control Rod Drive Exercise, Test 0074, is being performed.
The plant is operating at 100% power. Control Rod Drive Exercise, Test 0074, is being performed.
The RO performing the test has performed a turnover with you.
The RO performing the test has performed a turnover with you.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
Continue with Test 0074 at Control Rod 18-35.
Continue with Test 0074 at Control Rod 18-35.  
QF1075-01 Rev. 5 (FP
 
-T-SAT-75) Page 4 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
Page 4 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM PERFORMANCE INFORMATION Required Materials:
Test 0074 initialized and completed per setup instructions Control rod position printout (from step 1 of 0074)
Test 0074 initialized and completed per setup instructions Control rod position printout (from step 1 of 0074)
General  
General  


==References:==
==References:==
0074 C.4-B.01.03.C TaskStandards:
Perform the Operator Actions for a drifting control rod Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Performance Step: 1 Critical Y (0074 STEP 3) Select a withdrawn control rod by depressing the appropriate rod select pushbutton. Verify that the selected rod select pushbutton is illuminated and the selected rod indicates selection on the full-core display.
Standard:
Selects rod 18-35 Evaluator Cue:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:


0074  C.4-B.01.03.C  TaskStandards:
QF1075-01 Rev. 5 (FP-T-SAT-75)
Perform the Operator Actions for a drifting control rod Start Time:
Page 5 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
Performance Step: 2 Critical Y (0074 STEP 5) Insert the selected rod one notch by momentarily placing switch 3A-S2, ROD MOVEMENT CONTROL, in ROD IN position and verify the rod position indication for the selected control rod in the single rod and the four rod group display changes to the next lower latched position.
IMPORTANT:
Standard:
Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP
Places 3A-S2 in the ROD IN position.
-T-SAT-73 (Licensed Operator Requalification Program Examinations
Evaluator Cue:
). Performance Step:
None Performance:
1 Critical Y (0074 STEP 3) Select a withdrawn control rod by depressing the appropriate rod select pushbutton. Verify that the selected rod select pushbutton is illuminated and the selected rod indicates selection on the full-core display.
Standard: Selects rod 18-35  Evaluator Cue:
None   Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP
Performance Step: 3 Critical Y (0074 STEP 6) Withdraw the selected rod one notch by momentarily placing switch 3A-S2, ROD MOVEMENT CONTROL, in ROD OUT position and verify the rod position indication for the selected control rod in the single rod and the four rod group display changes to the next higher latched position.
-T-SAT-75)  Page 5 of 12  JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Standard:
-G-RM-01. Performance Step:
Places 3A-S2 in the ROD OUT position.
2 Critical Y (0074 STEP 5) Insert the selected rod one notch by momentarily placing switch 3A-S2, ROD MOVEMENT CONTROL, in ROD IN position and verify the rod position indication for the selected control rod in the single rod and the four rod group display changes to the next lower latched position. Standard: Places 3A-S2 in the ROD IN position.
Evaluator Cue:
Evaluator Cue:
None     Performance:
None Evaluator Note:
SATISFACTORY UNSATISFACTORY Comments:          Performance Step:
Ensure malfunction CH01_084 inserts when the candidate withdraws the rod. Rod 18-35 should start moving out.
3 Critical  Y (0074 STEP 6)  Withdraw the selected rod one notch by momentarily placing switch 3A
-S2, ROD MOVEMENT CONTROL, in ROD OUT position and verify the rod position indication for the selected control rod in the single rod and the four rod group display changes to the next higher latched position.
Standard: Places 3A-S2 in the ROD OUT position. Evaluator Cue:
None  Evaluator Note:
Ensure malfunction CH01_084 inserts when the candidate withdraws the rod. Rod 18
-35 should start moving out.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 6 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 4 Critical N Alternate Path:
Scans the Full Core Display and determines the number of control rods that are drifting.
Standard:
Scans the Full Core Display on C-05 for the rod with the RED drifting light ON.
Evaluator Cue:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP
Performance Step: 5 Critical N (C.4-B.01.03.C Procedure Step 1)
-T-SAT-75)  Page 6 of 12  JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
4 Critical  N Alternate Path:
Scans the Full Core Display and determines the number of control rods that are drifting.
Standard: Scans the Full Core Display on C
-05 for the rod with the RED drifting light ON. Evaluator Cue:
None  Performance:
SATISFACTORY UNSATISFACTORY Comments:          Performance Step:
5 Critical N (C.4-B.01.03.C Procedure Step 1)
Immediate Action If more than one control rod is drifting, Then insert a manual reactor scram.
Immediate Action If more than one control rod is drifting, Then insert a manual reactor scram.
Standard: Verifies only one rod is drifting and goes to STEP 2.
Standard:
Verifies only one rod is drifting and goes to STEP 2.
Evaluator Cue:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:
 
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 7 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 6 Critical Y (C.4-B.01.03.C Procedure Step 2)
Immediate Action Momentarily place ROD SELECT POWER SWITCH 3A-S1 (Panel C-05) in OFF and return it to ON to de-energize the rod select matrix and de-select the drifting control rod.
Standard:
: 1. Turns ROD SELECT POWER SWITCH to OFF (non-critical); and
: 2. Then turns ROD SELECT POWER SWITCH to the ON position (Critical ONLY if power switch was turned to OFF).
(Non-Critical portion of Standard)
Operator should verify that no rod is selected after turning the switch ON.
Evaluator Cue:
Evaluator Cue:
None   Performance:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP
Performance Step: 7 Critical Y (C.4-B.01.03.C Procedure STEP 3)
-T-SAT-75)  Page 7 of 12  JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Immediate Action If control rod drifting continues, Then re-select the drifting control rod, And insert and maintain the control rod at position 00 using normal or emergency insert.
-G-RM-01. Performance Step:
Standard:
6 Critical Y (C.4-B.01.03.C Procedure Step 2)
: 1. Drifting control rod is selected and inserted to 00 using either the NORMAL or EMERGENCY insert handswitch.
Immediate Action Momentarily place ROD SELECT POWER SWITCH 3A
: 2. Drifting control rod is maintained at 00.
-S1 (Panel C
-05) in OFF and return it to ON to de
-energize the rod select matrix and de
-select the drifting control rod.
Standard: 1. Turns ROD SELECT POWER SWITCH to OFF (non-critical);
and  2. Then turns ROD SELECT POWER SWITCH to the ON position (Critical ONLY if power switch was turned to OFF
).  (Non-Critical portion of Standard
) Operator should verify that no rod is selected after turning the switch ON.
Evaluator Cue:
None  Performance:
SATISFACTORY UNSATISFACTORY Comments:          Performance Step:
7 Critical Y (C.4-B.01.03.C Procedure STEP 3)
Immediate Action If control rod drifting continues, Then re-select the drifting control rod, And insert and maintain the control rod at position "00" using normal or emergency insert.
Standard: 1. Drifting control rod is selected and inserted to "00" using either the NORMAL or EMERGENCY insert handswitch.
: 2. Drifting control rod is maintained at "00".
Evaluator Cue:
Evaluator Cue:
If examinee requests to release the ROD IN switch, allow them to do so the rod will drift out again forcing them to reinsert it.
If examinee requests to release the ROD IN switch, allow them to do so the rod will drift out again forcing them to reinsert it.
Evaluator Note:
Evaluator Note:
BOOTH OPERATOR:
BOOTH OPERATOR: If the examinee holds the ROD IN then delete the drift out malfunction. If the examinee attempts to release the ROD IN switch do not delete the malfunction until they observe it drift out again and then reinsert the control rod.
If the examinee holds the ROD IN then delete the drift out malfunction. If the examinee attempts to release the ROD IN switch do not delete the malfunction until they observe it drift out again and then reinsert the control rod.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:  
QF1075-01 Rev. 5 (FP
 
-T-SAT-75) Page 8 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-G-RM-01. Performance Step:
Page 8 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
8 Critical N (C.4-B.01.03.C Procedure STEP 4)
Performance Step: 8 Critical N (C.4-B.01.03.C Procedure STEP 4)
Immediate Action Notify Shift Supervision.
Immediate Action Notify Shift Supervision.
Standard: Notifies Shift Supervision IAW OWI
Standard:
-01.03. Evaluator Cue:
Notifies Shift Supervision IAW OWI-01.03.
Evaluator Cue:
Acknowledge as the CRS Performance:
Acknowledge as the CRS Performance:
SATISFACTORY UNSATISFACTORY Comments:           Terminating Cues:
SATISFACTORY UNSATISFACTORY Comments:
When rod 18-35 has been fully inserted and the CRS has been notified
Terminating Cues:
, inform the operator that the JPM is complete.
When rod 18-35 has been fully inserted and the CRS has been notified, inform the operator that the JPM is complete.
Stop Time:
Stop Time:
Historical Record:
Historical Record: New create for the 2016 ILT NRC Exam  
New create for the 2016 ILT NRC Exam


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 9 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 9 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. Simulator Setup (as required)
Simulator Setup (as required):
Any IC with rod 18
Any IC with rod 18-35 withdrawn to an intermediate position.
-35 withdrawn to an intermediate position
Verify rod 18-39 is selected Insert malfunction CH01_084 for CRD 18-35 on event 1.
. Verify rod 18
Set event 1 to trigger on ZD_CRDWD.
-39 is selected Insert malfunction CH01_084 for CRD 18-35 on event 1.
Obtain a Control Rod position print out.
Set event 1 to trigger on ZD_CRD WD. Obtain a Control Rod position print out.
Initialize Surveillance Test 0074 SIMULATOR INPUT  
Initialize Surveillance Test 0074 SIMULATOR INPUT  


==SUMMARY==
==SUMMARY==
Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger 1
Malf CH01
_084 Control Rod 18-35 Drift out 00:00:05 Active 1
2 Malf CH01
_084 Control Rod 18-35 Drift out (Deletes in 1 second)
Active 2
Malf CH15
_084 CR 18-35 Elec DISARM DISARM


Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger 1 Malf CH01_0 84 Control Rod 18-35 Drift out 00:00:05  Active 1 2 Malf CH01_084 Control Rod 18-35 Drift out (Deletes in 1 second)
QF1075-01 Rev. 5 (FP-T-SAT-75)
Active  2 Malf CH15_084 CR 18-35 Elec DISARM DISARM QF1075-01 Rev. 5 (FP
Page 10 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 10 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
-G-RM-01. ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A
REVIEW STATEMENTS YES NO N/A 1. Are all items on the cover page filled in correctly?
: 1.
: 2. Has the JPM been reviewed and validated by SMEs?
Are all items on the cover page filled in correctly?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?   4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 2.
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
Has the JPM been reviewed and validated by SMEs?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 3.
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non
: 4.
-Licensed Operators
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non
: 5.
-Licensed Operators
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 10. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 6.
If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8.
Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 9.
Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 12. Are all references identified, current, and accurate?
: 12. Are all references identified, current, and accurate?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered "YES" or the JPM is not valid for use. If all applicable questions are answered "YES" then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________        __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date  
Validation Personnel /Date                 Validation Personnel/Date
 
__________________________        __________________________
QF1075-01 Rev. 5 (FP-T-SAT-75)
Validation Personnel /Date                 Validation Personnel/Date
Page 11 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
__________________________        __________________________
ATTACHMENT 2 JPM Number: JPM-0074-002 JPM
Validation Personnel /Date                 Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                 Validation Personnel/Date


QF1075-01 Rev. 5 (FP
==Title:==
-T-SAT-75)  Page 11 of 12  JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Control Rod Drive Exercise Examinee & ID:
-G-RM-01. ATTACHMENT 2 JPM Number:
Evaluator:
JPM-0074-00 2  JPM Title:
Job
Control Rod Drive Exercise Examinee & ID:       Evaluator:
 
Job Title:
==Title:==
Date:       Start Time Finish Time PERFORMANCE RESULTS:
Date:
SAT: UNSAT:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATOR'S SIGNATURE:
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
.
 
QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 12 of 12 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 12 of 12 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
The plant is operating at 100% power. Control Rod Drive Exercise, Test 0074, is being performed.
The plant is operating at 100% power. Control Rod Drive Exercise, Test 0074, is being performed.
The RO performing the test has performed a turnover with you.
The RO performing the test has performed a turnover with you.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
Continue with Test 0074 at Control Rod 18
Continue with Test 0074 at Control Rod 18-35.  
-35.
 
QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
JOB PERFORMANCE MEASURE (JPM)
SITE:
MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
STARTUP THE RWCU SYSTEM JPM NUMBER:
STARTUP THE RWCU SYSTEM JPM NUMBER:
JPM-B.02.02-001 REV. 11   RELATED PRA INFORMATION:
JPM-B.02.02-001 REV.
None   TASK NUMBERS / TASK TITLE(S): CR204.102; NL204.101; NL204.105 Place RWCU System In Service with No. 11 RWCU Pump and 11 RWCU Filter/Demineralizer In Service K/A NUMBERS:
11 RELATED PRA INFORMATION:
204000 A2.04   A4.01 Rating: SRO/RO:
None TASK NUMBERS /
2.7/2.9 3.1/3.0 APPLICABLE METHOD OF TESTING:
TASK TITLE(S):
CR204.102; NL204.101; NL204.105 Place RWCU System In Service with No. 11 RWCU Pump and 11 RWCU Filter/Demineralizer In Service K/A NUMBERS:
204000 A2.04 A4.01 Rating: SRO/RO:
2.7/2.9 3.1/3.0 APPLICABLE METHOD OF TESTING:
Discussion:
Discussion:
Simulate/walkthrough:
Simulate/walkthrough:
Perform:   EVALUATION LOCATION:
Perform:
In-Plant:   Control Room:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Simulator:
Other:           Lab:       Time for Completion:
Other:
Lab:
Time for Completion:
10 Minutes Time Critical:
10 Minutes Time Critical:
No     Alternate Path:
No Alternate Path:
No     TASK APPLICABILITY:
No TASK APPLICABILITY:
SRO:   RO:   NLO   Additional site
SRO:
-specific signatures may be added as desired.
RO:
NLO Additional site-specific signatures may be added as desired.
Developed by:
Developed by:
Developer Date   Validated by:
Developer Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator (See JPM Validation Checklist, Attachment 1)
Date   Approved by:
Date Approved by:
Training Supervisor Date QF1075-01 Rev. 5 (FP
Training Supervisor Date  
-T-SAT-75) Page 2 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 2 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 237: Line 274:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The Reactor is Shutdown and Reactor coolant temperature is <212F. Preparation for a plant startup is in progress. The RWCU system is ready for operation.
The Reactor is Shutdown and Reactor coolant temperature is <212&deg;F. Preparation for a plant startup is in progress. The RWCU system is ready for operation.
No. 12 RWCU Filter is being backwashed and will be put in service later.
No. 12 RWCU Filter is being backwashed and will be put in service later.
The RWCU pumps and heat exchangers are filled and vented. RBCCW and Service Air Systems are operating properly.
The RWCU pumps and heat exchangers are filled and vented. RBCCW and Service Air Systems are operating properly.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The Control Room Supervisor directs you to place RWCU system in service by performing STEPS 12 and 13 of the RWCU system startup procedure B.02.02
The Control Room Supervisor directs you to place RWCU system in service by performing STEPS 12 and 13 of the RWCU system startup procedure B.02.02-05.D.1.
-05.D.1. Use No. 11 RWCU pump and No. 11 Filter.
Use No. 11 RWCU pump and No. 11 Filter.
All required steps prior to STEP 12 have been successfully completed.
All required steps prior to STEP 12 have been successfully completed.  


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 3 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 3 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
JPM PERFORMANCE INFORMATION Required Materials:
Full Scope Simulator General  
Full Scope Simulator General  


==References:==
==References:==
B.02.02-05 Task Standards:
B.02.02-05 Task Standards:
Startup the RWCU System Start Time:
Startup the RWCU System Start Time:
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT:
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP
Performance Step: 1 Locate procedure B.02.02-05 D.1. (System Startup During Shutdown or Refueling).
-T-SAT-73 (Licensed Operator Requalification Program Examinations
Standard:
). Performance Step:
1 Locate procedure B.02.02
-05 D.1. (System Startup During Shutdown or Refueling)
. Standard:
Locates appropriate procedure and steps.
Locates appropriate procedure and steps.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:  
QF1075-01 Rev. 5 (FP
 
-T-SAT-75) Page 4 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-G-RM-01. Performance Step:
Page 4 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
2 Critical Y (Procedure STEP 12)
Performance Step: 2 Critical Y (Procedure STEP 12)
CAUTION Step 13 must be performed immediately following step 12
CAUTION Step 13 must be performed immediately following step 12.
. START a reactor water cleanup pump using the Pump A or Pump B switch for the desired pump.
START a reactor water cleanup pump using the Pump A or Pump B switch for the desired pump.
Standard:
Standard:
Start s 11 RWCU pump using HS
Starts 11 RWCU pump using HS-12A-S5, and after a 3 second delay notices the pump trips. Notifies Control Room Supervisor.
-12A-S5, and after a 3 second delay notices the pump trips. Notifies Control Room Supervisor.
Evaluator Cue:
Evaluator Cue:
Control Room Supervisor notifies operator that an investigati on will be started and to start the 12 RWCU pump. Evaluator Note:
Control Room Supervisor notifies operator that an investigation will be started and to start the 12 RWCU pump.
Evaluator Note:
Do NOT give cue if operator does not notify the Control Room Supervisor.
Do NOT give cue if operator does not notify the Control Room Supervisor.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
3 Critical Y (Procedure STEP 12)
Performance Step: 3 Critical Y (Procedure STEP 12)
CAUTION Step 13 must be performed immediately following step 12.
CAUTION Step 13 must be performed immediately following step 12.
START a reactor water cleanup pump using the Pump A or Pump B switch for the desired pump.
START a reactor water cleanup pump using the Pump A or Pump B switch for the desired pump.
Standard: Starts 12 RWCU pump using HS
Standard:
-12A-S6 and observes CLEANUP PUMP DISCH pressure rising as indicated on PI 131. Performance:
Starts 12 RWCU pump using HS-12A-S6 and observes CLEANUP PUMP DISCH pressure rising as indicated on PI-12-131.
SATISFACTORY UNSATISFACTORY Comments:
Performance:
QF1075-01 Rev. 5 (FP
SATISFACTORY UNSATISFACTORY Comments:  
-T-SAT-75) Page 5 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. Performance Step:
QF1075-01 Rev. 5 (FP-T-SAT-75)
4 Critical N (Procedure STEP 13)
Page 5 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
NOTE 1: The AIR-TO-LOCK- GAUGE will indicate about 3 psig when the valve starts to open.
Performance Step: 4 Critical N (Procedure STEP 13)
NOTE 2: At flow >35 gpm the HOLDING PUMP will trip and AO 4-37A will close.
NOTE 1: The AIR-TO-LOCK-GAUGE will indicate about 3 psig when the valve starts to open.
NOTE 3: Step 13 is to be performed while in communication with the control room.
NOTE 2: At flow >35 gpm the HOLDING PUMP will trip and AO-12-4-37A will close.
At Panel C
NOTE 3: Step 13 is to be performed while in communication with the control room.
-82, slowly turn the manual regulator knob FIC 4-97A, to raise flow through the filter demin to 90 GPM as indicated on FI 141A. Standard: Directs the Radwaste APEO to slowly OPEN CV 4-15A. Operator should observe the following:
At Panel C-82, slowly turn the manual regulator knob FIC-12-4-97A, to raise flow through the filter demin to 90 GPM as indicated on FI-12-141A.
: 1. C04-B-21, CLEAN UP FILTER DEMIN FAILURE clears.
Standard:
: 2. FILTER A FLOW as indicated on FI 141A increases to ~90 gpm Evaluator Cue:
Directs the Radwaste APEO to slowly OPEN CV-12-4-15A.
Operator should observe the following:
: 1.
C04-B-21, CLEAN UP FILTER DEMIN FAILURE clears.
: 2.
FILTER A FLOW as indicated on FI-12-141A increases to ~90 gpm Evaluator Cue:
CV-12-4-15A is open.
CV-12-4-15A is open.
Evaluator Note:
Evaluator Note:
The RWCU pump has no minimum flow protection. If this step is not performed, pump damage will occur.
The RWCU pump has no minimum flow protection. If this step is not performed, pump damage will occur.
Booth Operator INSERT TRIGGER 1 and verify flow on No. 11 RWCU F/D to rises to 90 gpm   Performance:
Booth Operator INSERT TRIGGER 1 and verify flow on No. 11 RWCU F/D to rises to 90 gpm Performance:
SATISFACTORY UNSATISFACTORY Comments:     Terminating Cues:
SATISFACTORY UNSATISFACTORY Comments:
When 12 RWCU Pump is running with F/D flow ~90 gpm, terminate the JPM. Stop Time:
Terminating Cues:
Historical Record:
When 12 RWCU Pump is running with F/D flow ~90 gpm, terminate the JPM.
Updated for 2016 ILT NRC Exam
Stop Time:
Historical Record: Updated for 2016 ILT NRC Exam  


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 6 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 6 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. Simulator Setup (as required)
Simulator Setup (as required):
: 1. This JPM can be run from the following Standard (Specific) IC sets:
: 1. This JPM can be run from the following Standard (Specific) IC sets:
Cold Shutdown IC with RWCU secured Create Event Trigger 2 using ZD_RUSTR(1)
* Cold Shutdown IC with RWCU secured
* Create Event Trigger 2 using ZD_RUSTR(1)
SIMULATOR INPUT  
SIMULATOR INPUT  


==SUMMARY==
==SUMMARY==
Manual Trigger Type Code Description Delay Ramp Value Event Trigger 1
REM RU01B 11 RWCU F/D Setpoint 00:01:00 36 MAL RU01A 11 RWCU Pump trip 00:00:03 2


Manual Trigger Type Code Description Delay Ramp Value Event Trigger 1 REM RU01B 11 RWCU F/D Setpoint 00:0 1: 0 0 36  MAL RU01A 11 RWCU Pump trip 00:00:03  2 QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 7 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 7 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the cover page filled in correctly?
REVIEW STATEMENTS YES NO N/A
: 2. Has the JPM been reviewed and validated by SMEs?
: 1.
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?   4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
Are all items on the cover page filled in correctly?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 2.
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
Has the JPM been reviewed and validated by SMEs?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 3.
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non
Can the required conditions for the JPM be appropriately established in the simulator if required?
-Licensed Operators
: 4.
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
-Licensed Operators
: 5.
: 10. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6.
If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8.
Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 9.
Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 12. Are all references identified, current, and accurate?
: 12. Are all references identified, current, and accurate?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered "YES" or the JPM is not valid for use. If all applicable questions are answered "YES" then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________        __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date  
Validation Personnel /Date                 Validation Personnel/Date
 
__________________________        __________________________
QF1075-01 Rev. 5 (FP-T-SAT-75)
Validation Personnel /Date                 Validation Personnel/Date
Page 8 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
__________________________        __________________________
ATTACHMENT 2 JPM Number: JPM-B.02.02-001 JPM
Validation Personnel /Date                 Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                 Validation Personnel/Date


QF1075-01 Rev. 5 (FP
==Title:==
-T-SAT-75)  Page 8 of 9  JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Startup the RWCU System Examinee & ID:
-G-RM-01. ATTACHMENT 2 JPM Number:
Evaluator:
JPM-B.02.02-001  JPM Title:
Job
Startup the RWCU System Examinee & ID:       Evaluator:
 
Job Title:
==Title:==
Date:       Start Time Finish Time PERFORMANCE RESULTS:
Date:
SAT: UNSAT:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATOR'S SIGNATURE:
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
.
 
QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 9 of 9 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 9 of 9 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
The Reactor is Shutdown and Reactor coolant temperature is <212F. Preparation for a plant startup is in progress. The RWCU system is ready for operation.
The Reactor is Shutdown and Reactor coolant temperature is <212&deg;F. Preparation for a plant startup is in progress. The RWCU system is ready for operation.
No. 12 RWCU Filter is being backwashed and will be put in service later.
No. 12 RWCU Filter is being backwashed and will be put in service later.
The RWCU pumps and heat exchangers are filled and vented. RBCCW and Service Air Systems are operating properly.
The RWCU pumps and heat exchangers are filled and vented. RBCCW and Service Air Systems are operating properly.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The Control Room Supervisor directs you to place RWCU system in service by performing STEPS 12 and 13 of the RWCU system startup procedure B.02.02
The Control Room Supervisor directs you to place RWCU system in service by performing STEPS 12 and 13 of the RWCU system startup procedure B.02.02-05.D.1.
-05.D.1. Use No. 11 RWCU pump and No. 11 Filter.
Use No. 11 RWCU pump and No. 11 Filter.
All required steps prior to STEP 12 have been successfully completed.INFORM EVALUATOR WHEN YOU HAVE COMPLETED THE TASK!
All required steps prior to STEP 12 have been successfully completed.INFORM EVALUATOR WHEN YOU HAVE COMPLETED THE TASK!  


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. k JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
k JOB PERFORMANCE MEASURE (JPM)
OPEN THE MAIN STEAM LINE DRAIN S FOLLOWING A GROUP 1 ISOLATION   JPM NUMBER:
SITE:
JPM-C.5-3302-003 REV. 0   RELATED PRA INFORMATION:
MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
None   TASK NUMBERS / TASK TITLE(S): CR239.110 Open the MSIVs Following a Group 1 Isolation K/A NUMBERS:
OPEN THE MAIN STEAM LINE DRAINS FOLLOWING A GROUP 1 ISOLATION JPM NUMBER:
239001 A4.01 Rating: SRO/RO:
JPM-C.5-3302-003 REV.
4.2/4.0 APPLICABLE METHOD OF TESTING:
0 RELATED PRA INFORMATION:
None TASK NUMBERS /
TASK TITLE(S):
CR239.110 Open the MSIVs Following a Group 1 Isolation K/A NUMBERS:
239001 A4.01 Rating: SRO/RO:
4.2/4.0 APPLICABLE METHOD OF TESTING:
Discussion:
Discussion:
Simulate/walkthrough:
Simulate/walkthrough:
Perform:   EVALUATION LOCATION:
Perform:
In-Plant:   Control Room:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Simulator:
Other:           Lab:       Time for Completion:
Other:
Lab:
Time for Completion:
20 Minutes Time Critical:
20 Minutes Time Critical:
No     Alternate Path:
No Alternate Path:
Yes     TASK APPLICABILITY:
Yes TASK APPLICABILITY:
SRO:   RO:   NLO   Additional site
SRO:
-specific signatures may be added as desired.
RO:
NLO Additional site-specific signatures may be added as desired.
Developed by:
Developed by:
Developer Date   Validated by:
Developer Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator (See JPM Validation Checklist, Attachment 1)
Date   Approved by:
Date Approved by:
Training Supervisor Date QF1075-01 Rev. 5 (FP
Training Supervisor Date  
-T-SAT-75) Page 2 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation
 
) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
Page 2 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.  
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
 
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The Reactor is in hot shutdown following a Reactor Scram due to a spurious Group 1 isolation.
The Reactor is in hot shutdown following a Reactor Scram due to a spurious Group 1 isolation.
The cause of the isolation is known and was determined to be INVALID INITIATING CUES (IF APPLICABLE):
The cause of the isolation is known and was determined to be INVALID INITIATING CUES (IF APPLICABLE):
The CRS directs you to perform the following:
The CRS directs you to perform the following:
Reset the Group 1 Isolation by performing Step 10 ONLY of C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION  
Reset the Group 1 Isolation by performing Step 10 ONLY of C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION - GROUP 1) and THEN Restore and maintain RPV Pressure 700-750 psig IAW C.5-3302 (ALTERNATE PRESSURE CONTROL) using the Main Steam Line Drains.
- GROUP 1) and THEN Restore and maintain RPV Pressure 700
 
-750 psig IAW C.5-3302 (ALTERNATE PRESSURE CONTROL) using the Main Steam Line Drains
QF1075-01 Rev. 5 (FP-T-SAT-75)
.
Page 3 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF1075-01 Rev. 5 (FP
JPM PERFORMANCE INFORMATION Required Materials:
-T-SAT-75) Page 3 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
Full Scope Simulator General  
Full Scope Simulator General  


==References:==
==References:==
 
C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION - GROUP 1)
C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION  
C.5-3302 (ALTERNATE PRESSURE CONTROL)
- GROUP 1) C.5-3302 (ALTERNATE PRESSURE CONTROL)
Task Standards:
Task Standards:
Reopen the MSIVs following a Group 1 isolation Start Time:  
Reopen the MSIVs following a Group 1 isolation Start Time:  


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 4 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 4 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT:
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP
Performance Step: 1 Critical: N Obtain and review procedures:
-T-SAT-73 (Licensed Operator Requalification Program Examinations
o C.4-B.04.01.A (Primary Containment Isolation - Group 1) o C.5-3302 (Alternate Pressure Control)
). Performance Step:
Standard:
1 Critical: N Obtain and review procedures:
Locates appropriate procedures Evaluator Cue:
o C.4-B.04.01.A (Primary Containment Isolation  
None Performance:
- Group 1) o C.5-3302 (Alternate Pressure Control)
SATISFACTORY UNSATISFACTORY Comments:  
Standard: Locates appropriate procedure s  Evaluator Cue:
 
None     Performance:
QF1075-01 Rev. 5 (FP-T-SAT-75)
SATISFACTORY UNSATISFACTORY Comments:
Page 5 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF1075-01 Rev. 5 (FP
Performance Step: 2 Critical: Y C.4-B.04.01.A, STEP 10)
-T-SAT-75) Page 5 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
When cause of isolation has been corrected, Then perform the following to allow opening of MSIVs:
-G-RM-01. Performance Step:
: a. On Panel C-03, PLACE MSIV inboard handswitches in CLOSED:
2 Critical:
16A-S1A, AO-2-80A (11 INBD MSIV) 16A-S1B, AO-2-80B (12 INBD MSIV) 16A-S1C, AO-2-80C (13 INBD MSIV) 16A-S1D, AO-2-80D (14 INBD MSIV)
Y C.4-B.04.01.A, STEP
: b. On Panel C-03, PLACE MSIV outboard handswitches in CLOSED:
: 10) When cause of isolation has been corrected
16A-S2A, AO-2-86A (11 OTBD MSIV) 16A-S2B, AO-2-86B (12 OTBD MSIV) 16A-S2C, AO-2-86C (13 OTBD MSIV) 16A-S2D, AO-2-86D (14 OTBD MSIV)
, T hen perform the following to allow opening of MSIVs:
: c. On Panel C-04, VERIFY Recirc sample isolation valve handswitches in CLOSED:
: a. On Panel C
16A-S7, CV-2790 (RECIRC SX LINE INBD ISOL) 16A-S8, CV-2791 (RECIRC SX LINE OTBD ISOL)
-03, PLACE MSIV inboard handswitches in CLOSED:
: d. On Panel C-03, VERIFY Group 1 Isolation RESET using Reset pushbuttons:
16A-S1A, AO-2-80A (11 INBD MSIV
16A-S32A, Main Steam Isolation Reset - Inboard 16A-S32B, Main Steam Isolation Reset - Outboard Standard:
) 16A-S1B, AO-2-80B (12 INBD MSIV
Using C.4-B.04.01.A, candidate ensures:
) 16A-S1C, AO-2-80C (13 INBD MSIV
: 1. All MSIV and sample line valve hand-switches are in the CLOSE position.
) 16A-S1D, AO-2-80D (14 INBD MSIV
: 2. Pushbuttons 16-AS32A and 16A S32B have been depressed (white light indicators above pushbutton 16A S32A and 16A-S32B are lit)
) b. On Panel C
-03, PLACE MSIV outboard handswitches in CLOSED:
16A-S2A, AO-2-86A (11 OTBD MSIV) 16A-S2B, AO-2-86B (12 OTBD MSIV) 16A-S2C, AO-2-86C (13 OTBD MSIV
) 16A-S2D, AO-2-86D (14 OTBD MSIV)
: c. On Panel C
-04, VERIFY Recirc sample isolation valve handswitches in CLOSED: 16A-S7, CV-2790 (RECIRC SX LINE INBD ISOL) 16A-S8, CV-2791 (RECIRC SX LINE OTBD ISOL) d. On Panel C
-03, VERIFY Group 1 Isolation RESET using Reset pushbuttons:
16A-S32A, Main Steam Isolation Reset  
- Inboard   16A-S32B, Main Steam Isolation Reset  
- Outboard     Standard: Using C.4-B.04.01.A, candidate ensures:
: 1. All MSIV and sample line valve hand
-switches are in the CLOSE position.
: 2. Pushbuttons 16
-AS32A and 16A S32B have been depressed (white light indicators above pushbutton 16A S32A and 16A
-S32B are lit)
Evaluator Cue:
Evaluator Cue:
None   Performance:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:  
QF1075-01 Rev. 5 (FP
 
-T-SAT-75) Page 6 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-G-RM-01. Performance Step:
Page 6 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
3 Critical: N (C.5-3302, PART B Prerequisites)
Performance Step: 3 Critical: N (C.5-3302, PART B Prerequisites)
: 1. Main Condenser available as Heat Sink.
: 1. Main Condenser available as Heat Sink.
: 2. One of the following:
: 2. One of the following:
MSIVs are OPEN OR Group 1 Isolation reset OR bypassed Standard: Verifies perquisites are satisfied.
MSIVs are OPEN OR Group 1 Isolation reset OR bypassed Standard:
Verifies perquisites are satisfied.
Evaluator Cue:
Evaluator Cue:
None   Performance:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
4 Critical: Y (C.5-3302, PART B)
Performance Step: 4 Critical: Y (C.5-3302, PART B)
: 1. IF MSIVs are CLOSED, THEN verify the following valves are OPEN:
: 1. IF MSIVs are CLOSED, THEN verify the following valves are OPEN:
NOTE: MO-2373 may be throttled to control RPV pressure.
NOTE: MO-2373 may be throttled to control RPV pressure.
MO-2564, STEAM LINE DRAIN DWNSTRM MSIVS MO-2373, MAIN STEAM LINE DRAIN  
MO-2564, STEAM LINE DRAIN DWNSTRM MSIVS MO-2373, MAIN STEAM LINE DRAIN - INBOARD MO-2374, MAIN STEAM LINE DRAIN - OUTBOARD Standard:
- INBOARD MO-2374, MAIN STEAM LINE DRAIN  
: 1. Ensures that the following valves are OPEN:
- OUTBOARD   Standard: 1. Ensures that the following valves are OPEN:
MO-2564, STEAM LINE DRAIN DWNSTRM MSIVS (Normally OPEN)
MO-2564, STEAM LINE DRAIN DWNSTRM MSIVS (Normally OPEN)
MO-2373, MAIN STEAM LINE DRAIN  
MO-2373, MAIN STEAM LINE DRAIN - INBOARD (will be closed initially due to isolation; THROTTLABE in OPEN direction only)
- INBOARD (will be closed initially due to isolation; THROTTLABE in OPEN direction only)
MO-2374, MAIN STEAM LINE DRAIN - OUTBOARD (will be closed initially due to isolation; NOT Throttlable)
MO-2374, MAIN STEAM LINE DRAIN  
: 2. Controls depressurization/cooldown rate by throttling MO-2373 Evaluator Cue:
- OUTBOARD (will be closed initially due to isolation; NOT Throttlable)
None Evaluator Note:
: 2. Controls depressurization/cooldown rate by throttling MO
BOOTH OPERATOR: Verify Event Trigger 1 activates. This will initiate a steam leak in the Steam Chase.
-2373   Evaluator Cue:
Performance:
None   Evaluator Note:
SATISFACTORY UNSATISFACTORY Comments:  
BOOTH OPERATOR: Verify Event Trigger 1 activates. This will initiate a steam leak in the Steam Chase. Performance:
 
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP-T-SAT-75)
QF1075-01 Rev. 5 (FP
Page 7 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 7 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Performance Step: 5 Critical: N ALTERNATE PATH: ARP 3-B-56 (High Area Temp Steam Leak)
-G-RM-01. Performance Step:
: 1. On C-21, MONITOR area temperatures as indicated by TR-4926, Steam Leak Detection Recorder, and DETERMINE affected area(s).
5 Critical: N ALTERNATE PATH: ARP 3
Standard:
-B-56 (High Area Temp Steam Leak)
: 1. Recognizes rising Steam Chase temperatures and notifies CRS.
: 1. On C-21, MONITOR area temperatures as indicated by TR
-4926, Steam Leak Detection Recorder, and DETERMINE affected area(s).
Standard: 1. Recognizes rising Steam Chase temperatures and notifies CRS.
Evaluator Cue:
Evaluator Cue:
When notified as CRS, acknowledge the report.
When notified as CRS, acknowledge the report.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
6 Critical: N ALTERNATE PATH: ARP 3
Performance Step: 6 Critical: N ALTERNATE PATH: ARP 3-B-56
-B-56 2. Refer to the following procedures:
: 2. Refer to the following procedures:
: a. C.4-B.02.04.A (Steam Leaks Outside Primary Containment)
: a. C.4-B.02.04.A (Steam Leaks Outside Primary Containment)
Standard: 2. Enters C.4-B.02.04.A (Steam Leaks Outside Primary Containment)
Standard:
: 2. Enters C.4-B.02.04.A (Steam Leaks Outside Primary Containment)
Evaluator Cue:
Evaluator Cue:
None     Performance:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:  Performance Step:
7 Critical:  N ALTERNATE PATH: C.4
-B.02.04.A  1. EVACUATE personnel from affected area.
Standard: 1. Makes page announcement to evacuate the Reactor Building Evaluator Cue:
None    Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP
Performance Step: 7 Critical: N ALTERNATE PATH: C.4-B.02.04.A
-T-SAT-75) Page 8 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
: 1. EVACUATE personnel from affected area.
-G-RM-01. Performance Step:
Standard:
8 Critical:
: 1. Makes page announcement to evacuate the Reactor Building Evaluator Cue:
Y ALTERNATE PATH: C.4
None Performance:
-B.02.04.A 6. If the origin of the leak is identified, Then ISOLATE if possible
SATISFACTORY UNSATISFACTORY Comments:
. Standard: 6. Closes MO-2073 and/or MO
 
-2074 to isolate the leak Evaluator Cue:
QF1075-01 Rev. 5 (FP-T-SAT-75)
None   Evaluator Note:
Page 8 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Steps 3-5 of C.4-B.02.04.A do NOT apply for the purposes of this JPM Examinee may also close MSIVs using C.4
Performance Step: 8 Critical: Y ALTERNATE PATH: C.4-B.02.04.A
-B.04.01.A (PRIMARY CONTAINMENT ISOLATION  
: 6. If the origin of the leak is identified, Then ISOLATE if possible.
- GROUP 1     Performance:
Standard:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
: 6. Closes MO-2073 and/or MO-2074 to isolate the leak Evaluator Cue:
9 Critical:
None Evaluator Note:
N ALTERNATE PATH:
Steps 3-5 of C.4-B.02.04.A do NOT apply for the purposes of this JPM Examinee may also close MSIVs using C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION - GROUP 1 Performance:
Verifies On C
SATISFACTORY UNSATISFACTORY Comments:
-21, that the leak is isolated by monitoring steam chase temperatures.
Performance Step: 9 Critical: N ALTERNATE PATH:
Standard: Verifies lowering steam chase temperatures on C
Verifies On C-21, that the leak is isolated by monitoring steam chase temperatures.
-21   Evaluator Cue:
Standard:
None   Performance:
Verifies lowering steam chase temperatures on C-21 Evaluator Cue:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
Terminating Cues:
When the leak is isolated with MO
When the leak is isolated with MO-2073 and/or MO-2074 closed, terminate the JPM.
-2073 and/or MO
Stop Time:
-2074 closed, terminate the JPM. Stop Time:
Historical Record: New Create for the 2016 ILT NRC Exam.  
Historical Record:
 
New Create for the 2016 ILT NRC Exam.  
QF1075-01 Rev. 5 (FP-T-SAT-75)
.
Page 9 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF1075-01 Rev. 5 (FP
Simulator Setup (as required):
-T-SAT-75) Page 9 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Simulator Setup Instructions:
-G-RM-01. Simulator Setup (as required)
Simulator Setup Instructions:
Reset to any full power IC.
Reset to any full power IC.
Initiate a Group 1 Isolation using the malfunctions listed below Perform SCRAM Immediate Actions and EOP C.5
Initiate a Group 1 Isolation using the malfunctions listed below Perform SCRAM Immediate Actions and EOP C.5-1100 actions to stabilize RPV water level (using FW) and pressure (using SRVs on Low-Low Set)
-1100 actions to stabilize RPV water level (using FW) and pressure (using SRVs on Low
Set Event Trigger 1 to ZD_2374O SIMULATOR - MALFUNCTIONS:
-Low Set) Set Event Trigger 1 to ZD_2374O SIMULATOR  
MALF ID MALFUNCTION TITLE DELAY RAMP EVENT VALUE FINAL
- MALFUNCTIONS:
: 1.
MALF ID MALFUNCTION TITLE DELAY RAMP EVENT VALUE FINAL 1. PP05A Spurious Group 1  
PP05A Spurious Group 1 - Channel A1 Active
- Channel A1 Active 2. PP05C Spurious Group 1  
: 2.
- Channel B1 Active MS03 B Main Steam Line Rupture in Steam Tunnel 00:01:00 1 SIMULATOR  
PP05C Spurious Group 1 - Channel B1 Active MS03 B Main Steam Line Rupture in Steam Tunnel 00:01:00 1
- REMOTE FUNCTIONS:
SIMULATOR - REMOTE FUNCTIONS:
REMOTE FUNC No. REMOTE FUNCTION TITLE DELAY RAMP EVENT VALUE FINAL 1. PC17 Group 1 B/P C.5
REMOTE FUNC No.
-3017   INSTLD 2.         SIMUALTOR  
REMOTE FUNCTION TITLE DELAY RAMP EVENT VALUE FINAL
- OVERRIDES:
: 1.
OVERRIDE ID OVERRIDE DESCRIPTION DELAY RAMP EVENT VALUE FINAL 1.       2.       3.       4.
PC17 Group 1 B/P C.5-3017 INSTLD
QF1075-01 Rev. 5 (FP
: 2.
-T-SAT-75) Page 10 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
SIMUALTOR - OVERRIDES:
-G-RM-01. ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
OVERRIDE ID OVERRIDE DESCRIPTION DELAY RAMP EVENT VALUE FINAL
REVIEW STATEMENTS YES NO N/A 1. Are all items on the cover page filled in correctly?
: 1.
: 2. Has the JPM been reviewed and validated by SMEs?
: 2.
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 3.
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 4.  
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
 
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
QF1075-01 Rev. 5 (FP-T-SAT-75)
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
Page 10 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
-Licensed Operators
REVIEW STATEMENTS YES NO N/A
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non
: 1.
-Licensed Operators
Are all items on the cover page filled in correctly?
: 10. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 2.
Has the JPM been reviewed and validated by SMEs?
: 3.
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4.
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5.
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6.
If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8.
Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 9.
Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 12. Are all references identified, current, and accurate?
: 12. Are all references identified, current, and accurate?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered "YES" or the JPM is not valid for use. If all applicable questions are answered "YES" then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________        __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date  
Validation Personnel /Date                 Validation Personnel/Date
 
__________________________        __________________________
QF1075-01 Rev. 5 (FP-T-SAT-75)
Validation Personnel /Date                 Validation Personnel/Date
Page 11 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
__________________________        __________________________
ATTACHMENT 2 JPM Number: JPM-3302-003 JPM
Validation Personnel /Date                 Validation Personnel/Date
 
__________________________        __________________________
==Title:==
Validation Personnel /Date                 Validation Personnel/Date
Open the Main Steam Line Drains following a Group 1 Isolation Examinee & ID:
Evaluator:
Job


QF1075-01 Rev. 5 (FP
==Title:==
-T-SAT-75)  Page 11 of 12  JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Date:
-G-RM-01. ATTACHMENT 2 JPM Number:
Start Time Finish Time PERFORMANCE RESULTS:
JPM-3302-003  JPM Title:
SAT:
Open the Main Steam Line Drains following a Group 1 Isolation Examinee & ID:      Evaluator:
UNSAT:
Job Title:
Date:      Start Time Finish Time PERFORMANCE RESULTS:
SAT: UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATOR'S SIGNATURE:
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
.
 
QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 12 of 12 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 12 of 12 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
The Reactor is in hot shutdown following a Reactor Scram due to a spurious Group 1 isolation.
The Reactor is in hot shutdown following a Reactor Scram due to a spurious Group 1 isolation.
The cause of the isolation is known and was determined to be INVALID INITIATING CUES (IF APPLICABLE):
The cause of the isolation is known and was determined to be INVALID INITIATING CUES (IF APPLICABLE):
The CRS directs you to perform the following:
The CRS directs you to perform the following:
Reset the Group 1 Isolation by performing Step 10 ONLY of C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION  
Reset the Group 1 Isolation by performing Step 10 ONLY of C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION - GROUP 1) and THEN Restore and maintain RPV Pressure 700-750 psig IAW C.5-3302 (ALTERNATE PRESSURE CONTROL) using the Main Steam Line Drains.
- GROUP 1) and THEN Restore and maintain RPV Pressure 700
 
-750 psig IAW C.5-3302 (ALTERNATE PRESSURE CONTROL) using the Main Steam Line Drains
QF1075-01 Rev. 5 (FP-T-SAT-75)
.
Page 1 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 JOB PERFORMANCE MEASURE (JPM)
QF1075-01 Rev. 5 (FP
SITE:
-T-SAT-75) Page 1 of 10 JPM-B.03.02-00 5 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
MANUAL SWITCHOVER OF HPCI SUCTION FROM TORUS TO CST S  JPM NUMBER:
MANUAL SWITCHOVER OF HPCI SUCTION FROM TORUS TO CSTS JPM NUMBER:
JPM-B.03.02-00 5 REV. 0   RELATED PRA INFORMATION:
JPM-B.03.02-005 REV.
None   TASK NUMBERS / TASK TITLE(S): CR206.115 Transfer HPCI Suction from Torus to CST   K/A NUMBERS:
0 RELATED PRA INFORMATION:
None TASK NUMBERS /
TASK TITLE(S):
CR206.115 Transfer HPCI Suction from Torus to CST K/A NUMBERS:
206000 (HPCI)
206000 (HPCI)
A2.04 Rating: SRO/RO:
A2.04 Rating: SRO/RO:
3.7/3.7 Ability to manually operate and/or monitor in the control room:
3.7/3.7 Ability to manually operate and/or monitor in the control room:
Major systems valves APPLICABLE METHOD OF TESTING:
Major systems valves APPLICABLE METHOD OF TESTING:
Discussion:
Discussion:
Simulate/walkthrough:
Simulate/walkthrough:
Perform:   EVALUATION LOCATION:
Perform:
In-Plant:   Control Room:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Simulator:
Other:           Lab:       Time for Completion:
Other:
Lab:
Time for Completion:
10 Minutes Time Critical:
10 Minutes Time Critical:
No     Alternate Path:
No Alternate Path:
No     TASK APPLICABILITY:
No TASK APPLICABILITY:
SRO:   RO:   NLO   Additional site
SRO:
-specific signatures may be added as desired.
RO:
Developed by:             Developer Date   Validated by:
NLO Additional site-specific signatures may be added as desired.
Developed by:
Developer Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator (See JPM Validation Checklist, Attachment 1)
Date   Approved by:
Date Approved by:
Training Supervisor Date QF1075-01 Rev. 5 (FP
Training Supervisor Date  
-T-SAT-75) Page 2 of 10 JPM-B.03.02-00 5 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
 
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 2 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 636: Line 697:
INITIAL CONDITIONS:
INITIAL CONDITIONS:
HPCI suction was transferred to the Torus for testing.
HPCI suction was transferred to the Torus for testing.
INITIATING CUES:
The CRS directs you to transfer HPCI suction from the Torus back to the CSTs in accordance with B.03.02-05.G.3 INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.


INITIATING CUES:
QF1075-01 Rev. 5 (FP-T-SAT-75)
The CRS directs you to transfer HPCI suction from the Torus back to the CSTs in accordance with B.03.02-05.G.3  INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK
Page 3 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 JPM PERFORMANCE INFORMATION Required Materials:
.
QF1075-01 Rev. 5 (FP
-T-SAT-75) Page 3 of 10 JPM-B.03.02-00 5 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 JPM PERFORMANCE INFORMATION Required Materials:
Simulator General  
Simulator General  


==References:==
==References:==
B.03.02-05, HPCI Task Standards:
B.03.02-05, HPCI Task Standards:
HPCI suction switched from the Torus to the CSTs per B.03.02
HPCI suction switched from the Torus to the CSTs per B.03.02-05 G.3 Start Time:
-05 G.3 Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
IMPORTANT:
Performance Step: 1 Critical N Locates and reviews procedure B.03.02-05 G.3 (Manual Switchover of HPCI Suction from the Torus to the CSTs) and General Precautions Standard:
Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations
Obtains and reviews procedure B.03.02-05 G.3 and General Precautions Performance:
). Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
1 Critical N Locate s and reviews procedure B.03.02-05 G.3 (Manual Switchover of HPCI Suction from the Torus to the CSTs) and General Precautions Standard: Obtains and reviews procedure B.03.02-05 G.3 and General Precautions Performance:
Performance Step: 2 Critical N (B.03.02-05 G.3 Step 1)
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
Evaluate TS 3.5.1 for HPCI inoperability during the suction transfer Standard:
2 Critical N (B.03.02-05 G.3 Step 1) Evaluate TS 3.5.1 for HPCI inoperability during the suction transfer Standard: Notifies CRS to evaluate TS 3.5.1 as HPCI will be inoperable during the suction transfer Evaluator Cues:
Notifies CRS to evaluate TS 3.5.1 as HPCI will be inoperable during the suction transfer Evaluator Cues:
As the CRS state that TSs have been appropriately evaluated Performance:
As the CRS state that TSs have been appropriately evaluated Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 4 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Performance Step: 3 Critical Y (B.03.02-05 G.3 Step 2)
Place the following handswitches to CLOSE and VERIFY dual indication:
23A-S14 MO-2061 (HPCI TORUS SUCT INBD ISOL)
Standard:
Places HS in Close for MO-2061 and verifies dual indication Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 4 Critical Y (B.03.02-05 G.3 Step 2 Cont)
Place the following handswitches to CLOSE and VERIFY dual indication:
MO-2062 (HPCI TORUS SUCT INBD OTBD)
Standard:
Places HS in Close for MO-2062 and verifies dual indication.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP
Performance Step: 5 Critical Y (B.03.02-05 G.3 Step 3)
-T-SAT-75)  Page 4 of 10  JPM-B.03.02-00 5 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 P erformance Step:
Immediately verify OPEN MO-2063 (HPCI CST SUCTION)
3 Critical Y (B.03.02-05 G.3 Step 2) Place the following handswitches to CLOSE and VERIFY dual indication:
Standard:
23A-S14 MO-2061 (HPCI TORUS SUCT INBD ISOL
Verifies MO-2063 OPENS.
Standard: Places HS in Close for MO-2061 and verifies dual indication Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
SATISFACTORY UNSATISFACTORY Comments:  
4 Critical  Y (B.03.02-05 G.3 Step 2 Con't) Place the following handswitches to CLOSE and VERIFY dual indication:
 
MO-206 2 (HPCI TORUS SUCT INBD OTBD)   Standard:  Places HS in Close for MO-2062 and verifies dual indication
QF1075-01 Rev. 5 (FP-T-SAT-75)
. Performance:
Page 5 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Performance Step: 6 Critical N (B.03.02-05 G.2 Step 4)
SATISFACTORY UNSATISFACTORY Comments:          Performance Step:
Verify fully CLOSED MO-2061 MO-2062 Standard:
5 Critical Y (B.03.02-05 G.3 Step 3)   Immediately verify OPEN MO
Verifies both valves are fully closed Evaluator Cues:
-2063 (HPCI CST SUCTION)
None Performance:
Standard: Verifies MO
-2063 OPENS. Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP
Performance Step: 7 Critical N (B.03.02-05 G.3 Step 5)
-T-SAT-75)  Page 5 of 10  JPM-B.03.02-00 5 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Performance Step:
Evaluate TS 3.5.1 for HPCI operability Standard:
6 Critical  N (B.03.02-05 G.2 Step 4)  Verify fully CLOSED MO-2061  MO-2062  Standard:  Verifies both valves are fully closed Evaluator Cues:
Notifies CRS to evaluate TS 3.5.1 Evaluator Cues:
None  Performance:
SATISFACTORY UNSATISFACTORY Comments:          Performance Step:
7 Critical N (B.03.02-05 G.3 Step
: 5) Evaluate TS 3.5.1 for HPCI operability Standard: Notifies CRS to evaluate TS 3.5.1 Evaluator Cues:
As the CRS state that TSs have been appropriately evaluated Performance:
As the CRS state that TSs have been appropriately evaluated Performance:
SATISFACTORY UNSATISFACTORY Comments:           Terminating Cues:
SATISFACTORY UNSATISFACTORY Comments:
The candidate informs the evaluator that the task is complete
Terminating Cues:
. Stop Time:
The candidate informs the evaluator that the task is complete.
Stop Time:
Historical Record:
Historical Record:
New create for the 2016 ILT NRC Exam
New create for the 2016 ILT NRC Exam  


QF1075-01 Rev. 5 (FP-T-SAT-75) Page 6 of 10 JPM-B.03.02-00 5 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Simulator Setup (as required)
QF1075-01 Rev. 5 (FP-T-SAT-75)
: 1. This JPM can be run from the following Standard (Specific) IC sets:
Page 6 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Simulator Setup (as required):
Any IC with the HPCI suction aligned to the Torus and CST level >2.5' SIMULATOR INPUT  
: 1. This JPM can be run from the following Standard (Specific) IC sets:
* Any IC with the HPCI suction aligned to the Torus and CST level >2.5 SIMULATOR INPUT  


==SUMMARY==
==SUMMARY==
Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger


Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger QF1075-01 Rev. 5 (FP-T-SAT-75) Page 7 of 10 JPM-B.03.02-00 5 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-G-RM-01. ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
Page 7 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the cover page filled in correctly?
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
: 2. Has the JPM been reviewed and validated by SMEs?
REVIEW STATEMENTS YES NO N/A
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?   4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 1.
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
Are all items on the cover page filled in correctly?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 2.
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
Has the JPM been reviewed and validated by SMEs?
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non
: 3.
-Licensed Operators
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non
: 4.
-Licensed Operators
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 10. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 5.
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6.
If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8.
Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 9.
Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 12. Are all references identified, current, and accurate?
: 12. Are all references identified, current, and accurate?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered "YES" or the JPM is not valid for use. If all applicable questions are answered "YES" then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________        __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date  
Validation Personnel /Date                 Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                 Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                 Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                 Validation Personnel/Date


QF1075-01 Rev. 5 (FP-T-SAT-75) Page 8 of 10 JPM-B.03.02-00 5 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-G-RM-01.
Page 8 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.  
QF1075-01 Rev. 5 (FP-T-SAT-75) Page 9 of 10 JPM-B.03.02-00 5 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. ATTACHMENT 2 JPM Number:
QF1075-01 Rev. 5 (FP-T-SAT-75)
JPM-B.03.02-00 5  JPM Title:
Page 9 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Manual Switchover of HPCI Suction from Torus to CSTs Examinee & ID:       Evaluator:
ATTACHMENT 2 JPM Number: JPM-B.03.02-005 JPM
Job Title:
 
Date:       Start Time Finish Time PERFORMANCE RESULTS:
==Title:==
SAT: UNSAT:         COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
Manual Switchover of HPCI Suction from Torus to CSTs Examinee & ID:
EVALUATOR'S SIGNATURE:
Evaluator:
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained
Job
.
 
QF1075-01 Rev. 5 (FP
==Title:==
-T-SAT-75) Page 10 of 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Date:
-G-RM-01. ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
 
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 10 of 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
HPCI suction was transferred to the Torus for testing.
HPCI suction was transferred to the Torus for testing.
INITIATING CUES:
INITIATING CUES:
The CRS directs you to transfer HPCI suction from the Torus back to the CSTs in accordance with B.03.02-05.G.3 INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK
The CRS directs you to transfer HPCI suction from the Torus back to the CSTs in accordance with B.03.02-05.G.3 INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.
.
 
QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
JOB PERFORMANCE MEASURE (JPM)
SITE:
MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
MANUALLY INSERT A GROUP 5 ISOLATION JPM NUMBER:
MANUALLY INSERT A GROUP 5 ISOLATION JPM NUMBER:
JPM-B.02.03-011 REV. 2   RELATED PRA INFORMATION:
JPM-B.02.03-011 REV.
None   TASK NUMBERS / TASK TITLE(S): CR217.115 Open RCIC Steam Line Isolation Valves MO-2075 and MO
2 RELATED PRA INFORMATION:
-2076 CR200.161 Perform the Procedure for Primary Containment Group 5 Isolation K/A NUMBERS:
None TASK NUMBERS /
223002 A4.02 Rating: SRO/RO: 3.8 / 3.9 APPLICABLE METHOD OF TESTING:
TASK TITLE(S):
CR217.115 Open RCIC Steam Line Isolation Valves MO-2075 and MO-2076 CR200.161 Perform the Procedure for Primary Containment Group 5 Isolation K/A NUMBERS:
223002 A4.02 Rating: SRO/RO:
3.8 / 3.9 APPLICABLE METHOD OF TESTING:
Discussion:
Discussion:
Simulate/walkthrough:
Simulate/walkthrough:
Perform:   EVALUATION LOCATION:
Perform:
In-Plant:   Control Room:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Simulator:
Other:           Lab:       Time for Completion:
Other:
Lab:
Time for Completion:
10 Minutes Time Critical:
10 Minutes Time Critical:
No     Alternate Path:
No Alternate Path:
Yes     TASK APPLICABILITY:
Yes TASK APPLICABILITY:
SRO:   RO:   NLO   Additional site
SRO:
-specific signatures may be added as desired.
RO:
NLO Additional site-specific signatures may be added as desired.
Developed by:
Developed by:
Developer Date   Validated by:
Developer Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator (See JPM Validation Checklist, Attachment 1)
Date   Approved by:
Date Approved by:
Training Supervisor Date QF1075-01 Rev. 5 (FP
Training Supervisor Date  
-T-SAT-75) Page 2 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 2 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 770: Line 866:
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Plant is operating in Mode 1.
Plant is operating in Mode 1.
RCIC was isolated for maintenance and is in the process of being restored. RP has been notified.
RCIC was isolated for maintenance and is in the process of being restored.
RP has been notified.
INITIATING CUES:
INITIATING CUES:
CRS has directed you to open MO
CRS has directed you to open MO-2075 and MO-2076 in accordance with the B.02.03-05.G.5.  
-2075 and MO
 
-2076 in accordance with the B.02.03-05.G.5.
QF1075-01 Rev. 5 (FP-T-SAT-75)
QF10 75-01 Rev. 5 (FP
Page 3 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 3 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
JPM PERFORMANCE INFORMATION Required Materials:
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
None General  
None General  


==References:==
==References:==
 
B.02.03-05 (Reactor Core Isolation Cooling - System Operation), Rev. 31 C.4-B.04.01.E (Primary Containment Isolation - Group 5), Rev. 12 C.6-004-A-05 (RCIC Steam Line Hi Diff Press), Rev. 3 Task Standards:
B.02.03-05 (Reactor Core Isolation Cooling  
MO-2075 and MO-2076 opened in accordance with B.02.03-05, section G.5 with the Group 5 isolation subsequently inserted in accordance with C.4-B.04.01.E.
- System Operation), Rev. 31 C.4-B.04.01.E (Primary Containment Isolation  
- Group 5), Rev. 12 C.6-004-A-05 (RCIC Steam Line Hi Diff Press), Rev. 3 Task Standards:
MO-2075 and MO
-2076 opened in accordance with B.02.03
-05, section G.5 with the Group 5 isolation subsequently inserted in accordance with C.4-B.04.01.E.
Start Time:
Start Time:
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT:
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations
Performance Step: 1 Critical: N Obtain and review Procedure B.02.03-05, Section G.5 (Opening RCIC Steam Line Isolation Valves MO-2075 and MO-2076).
). Performance Step:
PREREQUISITES
1 Critical: N Obtain and review Procedure B.02.03-05, Section G.5 (Opening RCIC Steam Line Isolation Valves MO
-2075 and MO
-2076). PREREQUISITES
: 1. No Group V isolation signal is present
: 1. No Group V isolation signal is present
: 2. RP personnel notified to address necessary controls for changing rad conditions in the RCIC Room Standard: Obtains and reviews correct procedure and section.
: 2. RP personnel notified to address necessary controls for changing rad conditions in the RCIC Room Standard:
Obtains and reviews correct procedure and section.
Evaluator Cue:
Evaluator Cue:
State RP has been notified Performance:
State RP has been notified Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:  
QF10 75-01 Rev. 5 (FP
 
-T-SAT-75) Page 4 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-G-RM-01. Performance Step:
Page 4 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
2 Critical: N Procedure Step 1.
Performance Step: 2 Critical: N Procedure Step 1.
VERIFY Radiation Protection personnel have addressed necessary controls for changing radiological conditions in RCIC Room.
VERIFY Radiation Protection personnel have addressed necessary controls for changing radiological conditions in RCIC Room.
Standard: Based on Initial Conditions, marks this step as complete.
Standard:
Based on Initial Conditions, marks this step as complete.
Evaluator Cue:
Evaluator Cue:
If asked, INFORM Operator that RP has been notified.
If asked, INFORM Operator that RP has been notified.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
3 Critical: N Procedure Step 2.
Performance Step: 3 Critical: N Procedure Step 2.
VERIFY valves CV
VERIFY valves CV-2082A and CV-2082B, RCIC Steam Line Drain to Main Condenser, are OPEN.
-2082A and CV
Standard:
-2082B, RCIC Steam Line Drain to Main Condenser, are OPEN.
Observes RED indicating lights for CV-2082A & CV-2082B are ON and GREEN lights are OFF.
Standard: Observes RED indicating lights for CV-2082A & CV
-2082B are ON and GREEN lights are OFF.
Evaluator Cue:
Evaluator Cue:
None   Performance:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
4 Critical: Y Procedure Step 3.
Performance Step: 4 Critical: Y Procedure Step 3.
Fully OPEN MO
Fully OPEN MO-2076, RCIC Steam Line Isolation Outboard.
-2076, RCIC Steam Line Isolation Outboard.
: a. If MO-2076 does NOT fully OPEN and dual indication is received, Then CLOSE MO-2076.
: a. If MO-2076 does NOT fully OPEN and dual indication is received, Then CLOSE MO-2076. 1) Attempt to OPEN MO
: 1) Attempt to OPEN MO-2076 on additional time.
-2076 on additional time.
Standard:
Standard: Opens MO-2076 by momentarily rotating control switch 13A
Opens MO-2076 by momentarily rotating control switch 13A-S3 CW to the OPEN position.
-S3 CW to the OPEN position.
Evaluator Cue:
Evaluator Cue:
None   Performance:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:  
QF10 75-01 Rev. 5 (FP
 
-T-SAT-75) Page 5 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-G-RM-01. Performance Step:
Page 5 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
5 Critical: Y Procedure Step
Performance Step: 5 Critical: Y Procedure Step 4.
: 4. CAUTION Opening MO
CAUTION Opening MO-2075 too fast could cause the high flow switches to isolate the steam line or cause a steam hammer.
-2075 too fast could cause the high flow switches to isolate the steam line or cause a steam hammer.
JOG OPEN RCIC inboard steam line isolation valve MO-2075 to slowly pressurize the RCIC steam line.
JOG OPEN RCIC inboard steam line isolation valve MO
Standard:
-2075 to slowly pressurize the RCIC steam line.
Jogs Open MO-2075 by momentarily rotating control switch 13A-S1 CW to the OPEN position such that the RCIC Steam Line starts to pressurize.
Standard: Jogs Open MO
Non-critical Portion:
-2075 by momentarily rotating control switch 13A
Reports RCIC STEAM LINE HI DIFF PRESS annunciator 4-A-05 and Reactor Building Hi Radiation annunciator 4-A-11 and refers to ARP.
-S1 CW to the OPEN position such that the RCIC Steam Line starts to pressurize.
Non-critical Portion: Reports RCIC STEAM LINE HI DIFF PRESS annunciator 4
-A-05 and Reactor Building Hi Radiation annunciator 4
-A-11 and refers to ARP.
Evaluator Cue:
Evaluator Cue:
Floor Instructor: As CRS, ACKNOWLEDGE report.
Floor Instructor: As CRS, ACKNOWLEDGE report.
Simulator Operator: When RCIC steam line pressurizes to 500 psig, VERIFY TRIGGER 1 INSERTS. This causes a RCIC Steam Line rupture.
Simulator Operator: When RCIC steam line pressurizes to 500 psig, VERIFY TRIGGER 1 INSERTS. This causes a RCIC Steam Line rupture.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
6 Critical: N C.6-004-A-05, Steps 1 & 2.
Performance Step: 6 Critical: N C.6-004-A-05, Steps 1 & 2.
VERIFY automatic actions have initiated.
VERIFY automatic actions have initiated.
Standard: Reports that MO
Standard:
-2075 and MO
Reports that MO-2075 and MO-2076 did not auto-close.
-2076 did not auto
Obtains and reviews Procedure C.4-B.04.01.E (Primary Containment Isolation - Group 5).
-close. Obtains and reviews Procedure C.4-B.04.01.E (Primary Containment Isolation  
Evaluator Note:
- Group 5). Evaluator Note:
Operator may use the VERIFY automatic actions portion of the ARP as guidance to shut MO-2075 and MO-2076. If so, this satisfies Critical Performance Step 7 of the JPM.
Operator may use the "VERIFY automatic actions" portion of the ARP as guidance to shut MO
-2075 and MO
-2076. If so, this satisfies Critical Performance Step 7 of the JPM.
Evaluator Cue:
Evaluator Cue:
As CRS, ACKNOWLEDGE the report.
As CRS, ACKNOWLEDGE the report.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:  
QF10 75-01 Rev. 5 (FP
 
-T-SAT-75) Page 6 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-G-RM-01. Performance Step:
Page 6 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
7 Critical: Y C.4-B.04.01.E, Subsequent Operator Action Step 1.
Performance Step: 7 Critical: Y C.4-B.04.01.E, Subsequent Operator Action Step 1.
VERIFY the following RCIC valves CLOSE:
VERIFY the following RCIC valves CLOSE:
: a. MO-2075, RCIC Steam Supply Inbd Isol (Panel C
: a. MO-2075, RCIC Steam Supply Inbd Isol (Panel C-04)
-04) b. MO-2076, RCIC Steam Supply Otbd Isol (Panel C
: b. MO-2076, RCIC Steam Supply Otbd Isol (Panel C-04)
-04) Standard: Closes MO-2075 OR MO-2076 by momentarily rotating respective control switch 13A
Standard:
-S1/13A-S2 CCW to the CLOSE position.
Closes MO-2075 OR MO-2076 by momentarily rotating respective control switch 13A-S1/13A-S2 CCW to the CLOSE position.
Evaluator Note:
Evaluator Note:
Since either valve will effectively isolate the leak and clear the alarm, closing either valve will satisfy the Critical Step.
Since either valve will effectively isolate the leak and clear the alarm, closing either valve will satisfy the Critical Step.
Line 877: Line 957:
As CRS, ACKNOWLEDGE report and INFORM Operator another Operator will complete the remaining steps of this procedure.
As CRS, ACKNOWLEDGE report and INFORM Operator another Operator will complete the remaining steps of this procedure.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:         Terminating Cues:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
RCIC Steam Line has been isolated and RCIC STEAM LINE HI DIFF PRESS alarm 4-A-05 cleared.
RCIC Steam Line has been isolated and RCIC STEAM LINE HI DIFF PRESS alarm 4-A-05 cleared.
Stop Time:
Stop Time:
Historical Record:
Historical Record: Updated for the 2016 ILT NRC Exam  
Updated for the 2016 ILT NRC Exam


QF1075-01 Rev. 5 (FP-T-SAT-75) Page 7 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-G-RM-01. Simulator Setup (as required)
Page 7 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
: 1. This JPM can be run from the following Standard (Specific) IC sets:
Simulator Setup (as required):
Initialize to a Mode 1 IC.
: 1. This JPM can be run from the following Standard (Specific) IC sets:
Close Inboard RCIC isolation valve MO
* Initialize to a Mode 1 IC.
-2075. Close Trip Throttle valve MO
* Close Inboard RCIC isolation valve MO-2075.
-2080. De-pressurize the line by momentarily placing the handswitch for CV
* Close Trip Throttle valve MO-2080.
-2079 to OPEN.
* De-pressurize the line by momentarily placing the handswitch for CV-2079 to OPEN.
Once steam line is depressurized return CV
* Once steam line is depressurized return CV-2079 to Close.
-2079 to Close.
* Close Outboard RCIC isolation valve MO-2076.
Close Outboard RCIC isolation valve MO
* Insert malfunctions listed in below table.
-207 6. Insert malfunctions listed in below table.
SIMULATOR - MALFUNCTIONS:
SIMULATOR  
MALF ID MALFUNCTION TITLE DELAY RAMP EVENT FINAL VALUE
- MALFUNCTIONS:
: 1.
MALF ID MALFUNCTION TITLE DELAY RAMP EVENT FINAL VALUE 1. RC08 FAILURE OF RCIC TO AUTO ISOLATE (GRP5) 00:00:00 00:00:00 None Active Active 2. RC07 RCIC STEAM LINE LEAK 00:00:00 00:00:00 1 100 0 SIMULATOR  
RC08 FAILURE OF RCIC TO AUTO ISOLATE (GRP5) 00:00:00 00:00:00 None Active Active
- REMOTE FUNCTIONS:
: 2.
None. SIMULATOR  
RC07 RCIC STEAM LINE LEAK 00:00:00 00:00:00 1
- OVERRIDES:
100 0
None. SIMULATOR  
SIMULATOR - REMOTE FUNCTIONS:
- TRIGGERS: 1. ZARCPDRN > 0.333 - RCIC Steam Line Pressure > 500 PSIG activates Trigger 1 which causes a RCIC Steam Line rupture.
None.
SIMULATOR - OVERRIDES:
None.
SIMULATOR - TRIGGERS:
: 1. ZARCPDRN > 0.333 - RCIC Steam Line Pressure > 500 PSIG activates Trigger 1 which causes a RCIC Steam Line rupture.  


QF1075-01 Rev. 5 (FP-T-SAT-75) Page 8 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-G-RM-01. ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
Page 8 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the cover page filled in correctly?
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
: 2. Has the JPM been reviewed and validated by SMEs?
REVIEW STATEMENTS YES NO N/A
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?   4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 1.
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
Are all items on the cover page filled in correctly?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 2.
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
Has the JPM been reviewed and validated by SMEs?
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non
: 3.
-Licensed Operators
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non
: 4.
-Licensed Operators
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 10. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 5.
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6.
If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8.
Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 9.
Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 12. Are all references identified, current, and accurate?
: 12. Are all references identified, current, and accurate?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered "YES" or the JPM is not valid for use. If all applicable questions are answered "YES" then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________        __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date  
Validation Personnel /Date                 Validation Personnel/Date
 
__________________________        __________________________
QF1075-01 Rev. 5 (FP-T-SAT-75)
Validation Personnel /Date                 Validation Personnel/Date
Page 9 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
__________________________        __________________________
 
Validation Personnel /Date                 Validation Personnel/Date
QF1075-01 Rev. 5 (FP-T-SAT-75)
__________________________        __________________________
Page 10 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Validation Personnel /Date                 Validation Personnel/Date
ATTACHMENT 2 JPM Number: JPM-B.02.03-011 JPM
 
==Title:==
Manually Insert a Group 5 Isolation Examinee & ID:
Evaluator:
Job
 
==Title:==
Date:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.


QF1075-01 Rev. 5 (FP-T-SAT-75) Page 9 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-G-RM-01.
Page 11 of 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF1075-01 Rev. 5 (FP-T-SAT-75)  Page 10 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
-G-RM-01. ATTACHMENT 2 JPM Number:
Plant is operating in Mode 1.
JPM-B.02.03-011  JPM Title:
RCIC was isolated for maintenance and is in the process of being restored.
Manually Insert a Group 5 Isolation Examinee & ID:      Evaluator:
Job Title:
Date:      Start Time Finish Time PERFORMANCE RESULTS:
SAT:  UNSAT:        COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATOR'S SIGNATURE:
NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained
.
QF1075-01 Rev. 5 (FP
-T-SAT-75)  Page 11 of 11  Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
Plant is operating in Mode 1. RCIC was isolated for maintenance and is in the process of being restored.
RP has been notified.
RP has been notified.
INITIATING CUES:
INITIATING CUES:
CRS has directed you to open MO
CRS has directed you to open MO-2075 and MO-2076 in accordance with the B.02.03-05.G.5.  
-2075 and MO
 
-2076 in accordance with the B.02.03
QF1075-01 Rev. 5 (FP-T-SAT-75)
-05.G.5.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF1075-01 Rev. 5 (FP
JOB PERFORMANCE MEASURE (JPM)
-T-SAT-75) Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
SITE:
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
TURBINE-GENERATOR SYNCHRONIZATION AND LOADING JPM NUMBER:
TURBINE-GENERATOR SYNCHRONIZATION AND LOADING JPM NUMBER:
JPM-C.1-006 REV. 5   RELATED PRA INFORMATION:
JPM-C.1-006 REV.
None   TASK NUMBERS / TASK TITLE(S):
5 RELATED PRA INFORMATION:
CR200.126 Synchronize and load the Turbine
None TASK NUMBERS /
-Generator   K/A NUMBERS:
TASK TITLE(S):
700000 AA2.08 Rating: SRO/RO:
CR200.126 Synchronize and load the Turbine-Generator K/A NUMBERS:
4.4/4.3 APPLICABLE METHOD OF TESTING:
700000 AA2.08 Rating: SRO/RO:
4.4/4.3 APPLICABLE METHOD OF TESTING:
Discussion:
Discussion:
Simulate/walkthrough:
Simulate/walkthrough:
Perform:   EVALUATION LOCATION:
Perform:
In-Plant:   Control Room:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Simulator:
Other:           Lab:       Time for Completion:
Other:
Lab:
Time for Completion:
15 Minutes Time Critical:
15 Minutes Time Critical:
No     Alternate Path:
No Alternate Path:
Yes     TASK APPLICABILITY:
Yes TASK APPLICABILITY:
SRO:   RO:   NLO   Additional site
SRO:
-specific signatures may be added as desired.
RO:
Developed by:             Developer Date   Validated by:
NLO Additional site-specific signatures may be added as desired.
Developed by:
Developer Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator (See JPM Validation Checklist, Attachment 1)
Date   Approved by:
Date Approved by:
Training Supervisor Date QF1075-01 Rev. 5 (FP
Training Supervisor Date  
-T-SAT-75) Page 2 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 2 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 984: Line 1,091:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Reactor is in RUN at about 15% power with one and one
Reactor is in RUN at about 15% power with one and one-half bypass valves open.
-half bypass valves open.
The Main Generator is rolling at approximately 1800 rpm ready for synchronization.
The Main Generator is rolling at approximately 1800 rpm ready for synchronization.
Main Generator Automatic Voltage Regulator is currently out of service.
Main Generator Automatic Voltage Regulator is currently out of service.
Plant Management has authorized placing the Main Turbine  
Plant Management has authorized placing the Main Turbine -Generator on line with the Voltage Regulator in the MANUAL MODE.
-Generator on line with the Voltage Regulator in the MANUAL MODE.
Procedure 2167 has been completed through step 126 Steps 121 and 125 are N/Ad due to the voltage regulator being out of service.
Procedure 2167 has been completed through step 1 26 Steps 121 and 125 are N/Ad due to the voltage regulator being out of service.
Form QF-0023 (Determination for the Use of Not Applicable) for N/Aing Steps 121 and 125 have been completed in accordance with FP-G-DOC-03 (Procedure Use and Adherence).
Form QF-0023 (Determination for the Use of Not Applicable) for N/Aing Steps 1 21 and 1 25 have been completed in accordance with FP
INITIATING CUES:
-G-DOC-03 (Procedure Use and Adherence).
CRS directs you to synchronize and load the Main Turbine-Generator commencing with Step 127 Another Operator will record Time and Dates Breaker 8N8 will be closed first.
INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.  


INITIATING CUES:
QF1075-01 Rev. 5 (FP-T-SAT-75)
CRS direct s you to synchronize and load the Main Turbine
Page 3 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-Generator commencing with Step 127 Another Operator will record Time and Dates Breaker 8N8 will be closed first.
JPM PERFORMANCE INFORMATION Required Materials:
INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK
Marked up copy of 2167 (Part I) showing Steps 119, 120, 122, 123, 124 and 126 completed and Steps 121 and 125 marked as N/A.
.
General  
QF1075-01 Rev. 5 (FP
-T-SAT-75) Page 3 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
Marked up copy of 2167 (Part I) showing Steps 119, 120, 122, 123, 124 and 126 completed and Steps 121 and 125 marked as N/A. General  


==References:==
==References:==
 
2167 (Plant Startup)
2167 (Plant Startup
C.6-008-A-11 (Main Generator Volts/Hz Trouble)
C.6-008-A-11 (Main Generator Volts/Hz Trouble
FP-G-DOC-03 (Procedure Use and Adherence)
FP-G-DOC-03 (Procedure Use and Adherence)
QF-0023 (Determination for the Use of Not Applicable)
QF-0023 (Determination for the Use of Not Applicable)
Task Standards:
Task Standards:
Main Turbine
Main Turbine-Generator has been synchronized to the grid and loaded to ~30 MWe in accordance with 2167 with subsequent manual trip of Main Generator in accordance with C.6-008-A-11 when Voltage Regulator fails such that Generator output voltage exceeds 23.6 KV Start Time:
-Generator has been synchronized to the grid and loaded to ~30 MWe in accordance with 2167 with subsequent manual trip of Main Generator in accordance with C.6
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
-008-A-11 when Voltage Regulator fails such that Generator output voltage exceeds 23.6 KV Start Time:  
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Performance Step: 1 Critical: N Obtain and review Procedure 2167 Part I (Turbine-Generator Synchronization and Loading).
Standard:
Reviews correct procedure and section.
Evaluator Cue:
PROVIDE operator with Marked up copy of 2167 (Part I) showing Steps 119, 120, 122, 123, 124 and 126 completed and Steps 121 and 125 marked as N/A.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  


NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
QF1075-01 Rev. 5 (FP-T-SAT-75)
IMPORTANT:
Page 4 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP
Performance Step: 2 Critical: Y Procedure Step 127.
-T-SAT-73 (Licensed Operator Requalification Program Examinations
). Performance Step:
1 Critical:  N Obtain and review Procedure 2167 Part I (Turbine-Generator Synchronization and Loading
). Standard: Reviews correct procedure and section.
Evaluator Cue:
PROVIDE operator with Marked up copy of 2167 (Part I) showing Steps 119, 12 0, 12 2, 123, 124 and 1 26 completed and Steps 12 1 and 1 25 marked as N/A
. Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP
-T-SAT-75) Page 4 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
2 Critical: Y Procedure Step 127.
Place Synchronizing switch to ON, for one of Generator Output Breakers:
Place Synchronizing switch to ON, for one of Generator Output Breakers:
8N7/SS, Sync Main Gen Breaker No 1 8N8/SS, Sync Main Gen Breaker No 2
* 8N7/SS, Sync Main Gen Breaker No 1
* 8N8/SS, Sync Main Gen Breaker No 2
: a. OBSERVE Synchronizing pointer moving.
: a. OBSERVE Synchronizing pointer moving.
: b. OBSERVE Synchronizing Voltmeters and sensing lights activated Standard: Place Synchronizing switch to ON, for one of Generator Output Breakers:
: b. OBSERVE Synchronizing Voltmeters and sensing lights activated Standard:
8N7/SS, Sync Main Gen Breaker No 1 8N8/SS, Sync Main Gen Breaker No 2
Place Synchronizing switch to ON, for one of Generator Output Breakers:
* 8N7/SS, Sync Main Gen Breaker No 1
* 8N8/SS, Sync Main Gen Breaker No 2
: a. OBSERVE Synchronizing pointer moving.
: a. OBSERVE Synchronizing pointer moving.
: b. OBSERVE Synchronizing Voltmeters and sensing lights activated Evaluator Cue:
: b. OBSERVE Synchronizing Voltmeters and sensing lights activated Evaluator Cue:
If necessary repeat that 8N8 should be used for synchronizing per the turnover sheet   Evaluator Note:
If necessary repeat that 8N8 should be used for synchronizing per the turnover sheet Evaluator Note:
Per the turnover sheet 8N8 should be used for synchronizing Performance:
Per the turnover sheet 8N8 should be used for synchronizing Performance:
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
3 Critical: Y Procedure Step 128.
Performance Step: 3 Critical: Y Procedure Step 128.
Use SLCM, Speed Load Changer, to ADJUST the Generator speed until clockwise synchronous pointer rotation established.
Use SLCM, Speed Load Changer, to ADJUST the Generator speed until clockwise synchronous pointer rotation established.
Standard: Momentarily rotates control switch SLCM (located on Panel C
Standard:
-07) as necessary until synchroscope pointer (located on Panel C
Momentarily rotates control switch SLCM (located on Panel C-07) as necessary until synchroscope pointer (located on Panel C-08) is rotating CW.
-08) is rotating CW.
Evaluator Cue:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:
 
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 5 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 4 Critical: Y Procedure Step 129.
Adjust incoming voltage to match running voltage using 270/CS, Regulator Voltage Adjust (C-08).
Standard:
Momentarily rotates control switch 270/CS CW as necessary until incoming voltage approximately matches running voltage.
Evaluator Cue:
Evaluator Cue:
None   Performance:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP
Performance Step: 5 Critical: N Procedure Step 130.
-T-SAT-75)  Page 5 of 14  JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
If speed and voltage conditions are not met, Then Repeat Steps 128 and 129 until speed and voltage conditions are met.
-G-RM-01. Performance Step:
Standard:
4 Critical:  Y Procedure Step 129.
Repeats steps 128 and 129 as necessary to meet the standards indicated in Performance Steps 3 & 4.
Adjust incoming voltage to match running voltage using 270/CS, Regulator Voltage Adjust (C-08). Standard: Momentarily rotates control switch 270/CS CW as necessary until incoming voltage approximately matches running voltage
. Evaluator Cue:
None  Performance:
SATISFACTORY UNSATISFACTORY Comments:          Performance Step:
5 Critical: N Procedure Step 130.
If speed and voltage conditions are not met, Then Repeat Steps 128 and 1 29 until speed and voltage conditions are met.
Standard: Repeats steps 128 and 129 as necessary to meet the standards indicated in Performance Steps 3 & 4.
Evaluator Note:
Evaluator Note:
Candidate is allowed to return to Steps 128 and 1 29 as necessary to satisfy the standard. Evaluator Cue:
Candidate is allowed to return to Steps 128 and 129 as necessary to satisfy the standard.
None   Performance:
Evaluator Cue:
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
None Performance:
6 Critical: N Procedure Step 131.
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 6 Critical: N Procedure Step 131.
Allow the synchroscope to make at least two complete revolutions to verify that the synchroscope is operating properly.
Allow the synchroscope to make at least two complete revolutions to verify that the synchroscope is operating properly.
Standard: Observes the pointer on the synchroscope has completed at least two revolutions.
Standard:
Observes the pointer on the synchroscope has completed at least two revolutions.
Evaluator Cue:
Evaluator Cue:
None   Performance:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:  
QF1075-01 Rev. 5 (FP
 
-T-SAT-75) Page 6 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-G-RM-01. Performance Step:
Page 6 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
7 Critical: Y Procedure Step 132 a.
Performance Step: 7 Critical: Y Procedure Step 132 a.
W hen the synchroscope pointer is in the Green Band, T hen perform the following (load s the generator
When the synchroscope pointer is in the Green Band, Then perform the following (loads the generator):
): a. PLACE selected Main Generator Output Breaker (8N7 or 8N8) control switch to CLOSE and HOLD.
: a. PLACE selected Main Generator Output Breaker (8N7 or 8N8) control switch to CLOSE and HOLD.
1). W hen synchroscope pointer reaches 12 o
1). When synchroscope pointer reaches 12 o-clock position, Then RELEASE Main Generator Output Breaker control switch.
-clock position, T hen RELEASE Main Generator Output Breaker control switch.
2). If breaker does not close on the first attempt, Then PLACE breaker control switch in TRIP a) Verify alarm resets
2). I f breaker does not close on the first attempt, T hen PLACE breaker control switch in TRIP a) Verify alarm resets
: a. Enter step 130 above 3). If breaker does not close on second attempt, Then DO NOT reset breaker and alarm, a) notify System Engineer.
: a. Enter step 13 0 above 3). I f breaker does not close on second attempt, T hen DO NOT reset breaker and alarm,   a) notify System Engineer.
Standard:
Standard: Momentarily rotates control switch 8N8/CS CW to the CLOSE position such that Main Generator output breaker 8N8 closes.
Momentarily rotates control switch 8N8/CS CW to the CLOSE position such that Main Generator output breaker 8N8 closes.
If breaker fails to close on the first attempt, momentarily rotates control switch 8N8/CS CCW to the TRIP position and returns to Step 132. Evaluator Note:
If breaker fails to close on the first attempt, momentarily rotates control switch 8N8/CS CCW to the TRIP position and returns to Step 132.
Evaluator Note:
Operator may utilize two attempts to close breaker. If operator is unsuccessful in closing the breaker after two attempts and the system engineer is contacted the operator can be informed that they may continue to attempt to close the breaker. This is if it appears that the operator has been attempting to correctly close the breaker while the synchroscope is in the green band. If the operator has been incorrectly attempting to sync the generator then mark this step as UNSAT and inform the operator that the JPM is complete Evaluator Cue:
Operator may utilize two attempts to close breaker. If operator is unsuccessful in closing the breaker after two attempts and the system engineer is contacted the operator can be informed that they may continue to attempt to close the breaker. This is if it appears that the operator has been attempting to correctly close the breaker while the synchroscope is in the green band. If the operator has been incorrectly attempting to sync the generator then mark this step as UNSAT and inform the operator that the JPM is complete Evaluator Cue:
Simulator Operator: When operator closes Breaker 8N8 , VERIFY Trigger 1 automatically activates. This will insert the Voltage Regulator RAISE overrides which will drive Generator voltage high out of specification and prevent manual lowering of the voltage regulator.
Simulator Operator: When operator closes Breaker 8N8, VERIFY Trigger 1 automatically activates. This will insert the Voltage Regulator RAISE overrides which will drive Generator voltage high out of specification and prevent manual lowering of the voltage regulator.
Simulator Operator
Simulator Operator: ROLE PLAY: If contacted as System Engineer, ACKNOWLEDGE report and INFORM operator an investigation will be promptly initiated.
: ROLE PLAY:
Floor Instructor: If operator is unsuccessful in closing the breaker after two attempts, INFORM operator JPM is complete.
If contacted as System Engineer, ACKNOWLEDGE report and INFORM operator an investigation will be promptly initiated.
Floor Instructor:
If operator is unsuccessful in closing the breaker after two attempts, INFORM operator JPM is complete.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:  
QF1075-01 Rev. 5 (FP
 
-T-SAT-75) Page 7 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-G-RM-01. Performance Step:
Page 7 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
8 Critical: N Procedure Step 132.b.
Performance Step: 8 Critical: N Procedure Step 132.b.
Use SLCM, Speed Load Changer to immediately pick up 5% load (about 30 MWe). Standard: Momentarily rotates control switch SLCM CW to the RAISE position until Main Generator has been loaded to 25  
Use SLCM, Speed Load Changer to immediately pick up 5% load (about 30 MWe).
- 35 MWe. Observes Generator output on the No. 1 Main Generator Megawatt meter (Panel C-08) and/or the Main Generator Megawatt LED (Panel C
Standard:
-07) is reading ~30 MWe.
Momentarily rotates control switch SLCM CW to the RAISE position until Main Generator has been loaded to 25 - 35 MWe.
Observes Generator output on the No. 1 Main Generator Megawatt meter (Panel C-08) and/or the Main Generator Megawatt LED (Panel C-07) is reading ~30 MWe.
Evaluator Note:
Evaluator Note:
MWe may exceed 35 MWe due to the voltage regulator failure. This would not be considered a failure of this step.
MWe may exceed 35 MWe due to the voltage regulator failure. This would not be considered a failure of this step.
Based on recognition of Main Generator voltage rising, this step may not be done. Evaluator Cue:
Based on recognition of Main Generator voltage rising, this step may not be done.
None   Performance:
Evaluator Cue:
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
None Performance:
9 Critical: N Procedure Step 132.c.
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 9 Critical: N Procedure Step 132.c.
Check generator voltage and current indications are approximately equal for each phase.
Check generator voltage and current indications are approximately equal for each phase.
Standard: Observes amperage readings on the three No. 1 Main Generator Phase A/B/C Kiloamp meters (Panel C
Standard:
-08) are approximately equal.
Observes amperage readings on the three No. 1 Main Generator Phase A/B/C Kiloamp meters (Panel C-08) are approximately equal.
Rotates the Phase Voltage Select Switch VS1 (Panel C
Rotates the Phase Voltage Select Switch VS1 (Panel C-08) CW and/or CCW as necessary and observes voltage readings on all three phases are approximately equal.
-08) CW and/or CCW as necessary and observes voltage readings on all three phases are approximately equal.
Should notice that voltage and MVAR readings are rising and reports this to the CRS.
Should notice that voltage and MVAR readings are rising and reports this to the CRS. When annunciator 8
When annunciator 8-A-11 alarms, reports alarm and pulls associated ARP.
-A-11 alarms, reports alarm and pulls associated ARP.
Evaluator Cue:
Evaluator Cue:
Floor Instructor: If operator reports Main Generator voltage and MVAR rising and/or alarm, ACKNOWLEDGE report.
Floor Instructor: If operator reports Main Generator voltage and MVAR rising and/or alarm, ACKNOWLEDGE report.
Simulator Operator: When Main Generator output voltage rises to 23.1 KV , VERIFY Trigger 2 automatically activates. This will cause the Main Generator Volts/Hz Trouble annunciator (8
Simulator Operator: When Main Generator output voltage rises to 23.1 KV, VERIFY Trigger 2 automatically activates. This will cause the Main Generator Volts/Hz Trouble annunciator (8-A-11) to alarm.
-A-11) to alarm.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 8 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 10 Critical: N ALTERNATE PATH Obtain and review ARP C.6-008-A-11 (Main Generator Volts/Hz Trouble).
Standard:
Announces alarm.
Obtains and reviews correct Alarm Response Procedure.
Evaluator Cue:
As CRS acknowledge communication Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP
Performance Step: 11 Critical: N (C.6-008-A-11) Procedure Step 1.
-T-SAT-75)  Page 8 of 14  JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Perform the following:
-G-RM-01. Performance Step:
Standard:
10 Critical:  N ALTERNATE PATH Obtain and review ARP C.6-008-A-11 (Main Generator Volts/Hz Trouble)
Starts to perform Step 1 of ARP.
. Standard:  Announces alarm.
Obtains and reviews correct Alarm Response Procedure.
Evaluator Cue: As CRS acknowledge communication Performance:
SATISFACTORY UNSATISFACTORY Comments:          Performance Step:
11 Critical: N (C.6-008-A-11) Procedure Step 1. Perform the following:
Standard: Starts to perform Step 1 of ARP.
Evaluator Cue:
Evaluator Cue:
When operator starts to perform Step 1 of the ARP, INFORM him another operator has completed Step 1. Performance:
When operator starts to perform Step 1 of the ARP, INFORM him another operator has completed Step 1.
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
Performance:
12 Critical: N (C.6-008-A-11) Procedure Step 2
SATISFACTORY UNSATISFACTORY Comments:
. I f the Generator is ON
Performance Step: 12 Critical: N (C.6-008-A-11) Procedure Step 2.
-LINE, T hen reduce excitation to lower generator output voltage to < 23.1 KV.
If the Generator is ON-LINE, Then reduce excitation to lower generator output voltage to < 23.1 KV.
Standard: Momentarily rotates control switch 270/CS CCW to the LOWER position.
Standard:
Momentarily rotates control switch 270/CS CCW to the LOWER position.
Observes no response from the Voltage Regulator.
Observes no response from the Voltage Regulator.
Observes Main Generator voltage and MVARs continue to rise.
Observes Main Generator voltage and MVARs continue to rise.
Evaluator Cue:
Evaluator Cue:
As CRS acknowledge communication Performance:
As CRS acknowledge communication Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 9 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 13 Critical: Y (C.6-008-A-11) Procedure Step 2.a.
If actions taken to lower output voltage are not effective, And Generator output voltage is 23.6 KV, Then trip the Generator using the GENERATOR EMERGENCY TRIP handswitch. (C-08).
Standard:
Momentarily rotates control switch GT/CS CW or CCW to the TRIP position.
Evaluator Cue:
Floor Instructor: As CRS, ACKNOWLEDGE report.
Floor Instructor: When operator trips the Main Generator, INFORM him another operator will complete remaining portions of procedures.
Simulator Operator: When Operator trips Main Generator, VERIFY Triggers 3 and/or 4 automatically activate. This will delete the Main Generator voltage indication override.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP
Terminating Cues:
-T-SAT-75)  Page 9 of 14  JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
When the Main Generator is manually tripped inform the operator that the JPM is complete Stop Time:
-G-RM-01. Performance Step:
13 Critical:  Y (C.6-008-A-11) Procedure Step 2.a. I f actions taken to lower output voltage are not effective, A nd  T hen trip the Generator using the GENERATOR EMERGENCY TRIP handswitch. (C
-08). Standard:  Momentarily rotates control switch GT/CS CW or CCW to the TRIP position. Evaluator Cue:
Floor Instructor:  As CRS, ACKNOWLEDGE report.
Floor Instructor:  When operator trips the Main Generator, INFORM him another operator will complete remaining portions of procedures.
Simulator Operator:  When Operator trips Main Generator , VERIFY Trigger s 3 and/or 4 automatically activate. This will delete the Main Generator voltage indication override.
Performance:
SATISFACTORY UNSATISFACTORY Comments:          Terminating Cues:
When the Main Generator is manually tripped inform the operator that the JPM is complete Stop Time:
Historical Record:
Historical Record:
Updated for 2167 Revision 94 and 2016 ILT NRC Exam Removed Performance Steps for 2167 that are not performed due to the alternate path
Updated for 2167 Revision 94 and 2016 ILT NRC Exam Removed Performance Steps for 2167 that are not performed due to the alternate path  
 
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 10 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Simulator Setup (as required):
: 1. This JPM can be run from the following Standard (Specific) IC sets:
Initialize to a startup IC-171 or IC with Reactor Power at ~15% and Turbine at ~1800 RPM and ready for synchronization.
Ensure the AUTO/MAN REGULATOR SELECTOR switch is in the MAN position with the WHITE light ON.
Ensure the Power Stabilizer is removed from service.
Acknowledge alarm 8-A-31 (Voltage Regulator Manual Mode) and hang caution tag on the AUTO/MAN REGULATOR SELECTOR switch.
Adjust Voltage Regulator and Speed/Load Changer as necessary such that incoming voltage is ~2 volts less than running voltage and synchroscope is moving slowly in the counterclockwise direction.
Ensure the Turbine Speed & Bypass Valve Cam Position recorder is selected for the Turbine Speed display.
Insert malfunctions & triggers listed in below tables.
SIMULATOR - MALFUNCTIONS:
MALF ID MALFUNCTION TITLE DELAY RAMP EVENT FINAL VALUE
: 1.
C-08-A11 MAIN GENERATOR VOLTZ/HZ TROUBLE 00:00:00 00:00:00 2
Active InActive SIMULATOR - REMOTE FUNCTIONS:
None SIMULATOR - OVERRIDES:
OVR ID MALFUNCTION TITLE DELAY RAMP EVENT FINAL VALUE
: 1.
05-S069-02 MANUAL VOLTAGE ADJUST -
RAISE (DELETE IN 5 SECONDS) 00:00:00 00:00:00 1
True False
: 2.
05-S069-02 MANUAL VOLTAGE ADJUST -
RAISE (DELETE IN 5 SECONDS) 00:00:07 00:00:00 1
True False
: 3.
05-S069-02 MANUAL VOLTAGE ADJUST -
RAISE (DELETE IN 5 SECONDS) 00:00:14 00:00:00 1
True False
: 4.
05-S069-02 MANUAL VOLTAGE ADJUST -
RAISE (DELETE IN 5 SECONDS) 00:00:21 00:00:00 1
True False
: 5.
05-S069-02 MANUAL VOLTAGE ADJUST -
RAISE (DELETE IN 5 SECONDS) 00:00:28 00:00:00 1
True False
: 6.
05-S069-02 MANUAL VOLTAGE ADJUST -
RAISE (DELETE IN 5 SECONDS) 00:00:35 00:00:00 1
True False
: 7.
05-S069-02 MANUAL VOLTAGE ADJUST -
RAISE (DELETE IN 5 SECONDS) 00:00:42 00:00:00 1
True False
: 8.
05-S069-02 MANUAL VOLTAGE ADJUST -
RAISE (DELETE IN 5 SECONDS) 00:00:49 00:00:00 1
True False
: 9.
05-S069-02 MANUAL VOLTAGE ADJUST -
RAISE (DELETE IN 5 SECONDS) 00:00:56 00:00:00 1
True False
: 10.
05-S069-02 MANUAL VOLTAGE ADJUST -
RAISE (DELETE IN 5 SECONDS) 00:01:03 00:00:00 1
True False


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 10 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 11 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. Simulator Setup (as required):  1. This JPM can be run from the following Standard (Specific) IC sets:
OVR ID MALFUNCTION TITLE DELAY RAMP EVENT FINAL VALUE
Initialize to a startup IC
: 11.
-171 or IC with Reactor Power at ~15% and Turbine at ~1800 RPM and ready for synchronization.
05-S069-02 MANUAL VOLTAGE ADJUST -
Ensure the AUTO/MAN REGULATOR SELECTOR switch is in the MAN position with the WHITE light ON. Ensure the Power Stabilizer is removed from service.
RAISE (DELETE IN 5 SECONDS) 00:01:10 00:00:00 1
Acknowledge alarm 8
True False
-A-31 (Voltage Regulator Manual Mode) and hang caution tag on the AUTO/MAN REGULATOR SELECTOR switch. Adjust Voltage Regulator and Speed/Load Changer as necessary such that incoming voltage is ~2 volts less than running voltage and synchroscope is moving slowly in the counterclockwise direction.
: 12.
Ensure the Turbine Speed & Bypass Valve Cam Position recorder is selected for the Turbine Speed display. Insert malfunctions & triggers listed in below tables.
05-S069-02 MANUAL VOLTAGE ADJUST -
SIMULATOR
RAISE (DELETE IN 5 SECONDS) 00:01:17 00:00:00 1
- MALFUNCTIONS:
True False
MALF ID MALFUNCTION TITLE DELAY RAMP EVENT FINAL VALUE 1. C-08-A11 MAIN GENERATOR VOLTZ/HZ TROUBLE 00:00:00 00:00:00 2 Active InActive  SIMULATOR
: 13.
- REMOTE FUNCTIONS:
05-S069-02 MANUAL VOLTAGE ADJUST -
None  SIMULATOR
RAISE (DELETE IN 5 SECONDS) 00:01:24 00:00:00 1
- OVERRIDES:
True False
OVR ID MALFUNCTION TITLE DELAY RAMP EVENT FINAL VALUE 1. 05-S069-02 MANUAL VOLTAGE ADJUST  
: 14.
- RAISE (DELETE IN 5 SECONDS) 00:00:00 00:00:00 1 True False 2. 05-S069-02 MANUAL VOLTAGE ADJUST
05-S069-02 MANUAL VOLTAGE ADJUST -
- RAISE (DELETE IN 5 SECONDS) 00:00:07 00:00:00 1 True False 3. 05-S069-02 MANUAL VOLTAGE ADJUST
RAISE (DELETE IN 5 SECONDS) 00:01:31 00:00:00 1
- RAISE (DELETE IN 5 SECONDS) 00:00:14 00:00:00 1 True False 4. 05-S069-02 MANUAL VOLTAGE ADJUST  
True False
- RAISE (DELETE IN 5 SECONDS) 00:00:21 00:00:00 1 True False 5. 05-S069-02 MANUAL VOLTAGE ADJUST
: 15.
- RAISE (DELETE IN 5 SECONDS) 00:00:28 00:00:00 1 True False 6. 05-S069-02 MANUAL VOLTAGE ADJUST
05-S069-02 MANUAL VOLTAGE ADJUST -
- RAISE (DELETE IN 5 SECONDS) 00:00:35 00:00:00 1 True False 7. 05-S069-02 MANUAL VOLTAGE ADJUST
RAISE (DELETE IN 5 SECONDS) 00:01:38 00:00:00 1
- RAISE (DELETE IN 5 SECONDS) 00:00:42 00:00:00 1 True False 8. 05-S069-02 MANUAL VOLTAGE ADJUST
True False
- RAISE (DELETE IN 5 SECONDS) 00:00:49 00:00:00 1 True False 9. 05-S069-02 MANUAL VOLTAGE ADJUST  
: 16.
- RAISE (DELETE IN 5 SECONDS) 00:00:56 00:00:00 1 True False 10. 05-S069-02 MANUAL VOLTAGE ADJUST
05-S069-02 MANUAL VOLTAGE ADJUST -
- RAISE (DELETE IN 5 SECONDS) 00:01:03 00:00:00 1 True False QF1075-01 Rev. 5 (FP
RAISE (DELETE IN 5 SECONDS) 00:01:45 00:00:00 1
-T-SAT-75)  Page 11 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
True False
-G-RM-01. OVR ID MALFUNCTION TITLE DELAY RAMP EVENT FINAL VALUE 11. 05-S069-02 MANUAL VOLTAGE ADJUST  
: 17.
- RAISE (DELETE IN 5 SECONDS) 00:01:10 00:00:00 1 True False 12. 05-S069-02 MANUAL VOLTAGE ADJUST
05-S069-01 MANUAL VOLTAGE ADJUST -
- RAISE (DELETE IN 5 SECONDS) 00:01:17 00:00:00 1 True False 13. 05-S069-02 MANUAL VOLTAGE ADJUST
LOWER 00:00:00 00:00:00 1
- RAISE (DELETE IN 5 SECONDS) 00:01:24 00:00:00 1 True False 14. 05-S069-02 MANUAL VOLTAGE ADJUST
False False SIMULATOR - TRIGGERS:
- RAISE (DELETE IN 5 SECONDS) 00:01:31 00:00:00 1 True False 15. 05-S069-02 MANUAL VOLTAGE ADJUST  
: 1.
- RAISE (DELETE IN 5 SECONDS) 00:01:38 00:00:00 1 True False 16. 05-S069-02 MANUAL VOLTAGE ADJUST  
ZL_8N5R2 - Breaker 8N8 breaker closed RED lamp LIT ACTIVATES Trigger 1. This inserts a series of overrides to the Voltage Regulator manual adjustment such that Main Generator output voltage rises and prevents manual lowering of the Voltage Regulator.
- RAISE (DELETE IN 5 SECONDS) 00:01:45 00:00:00 1 True False 17. 05-S069-01 MANUAL VOLTAGE ADJUST  
: 2.
- LOWER 00:00:00 00:00:00 1 False False SIMULATOR  
ZAVMMG > 0.75 - Main Generator output voltage rising to 23.1 KV ACTIVATES Trigger 2. This causes the Main Generator Volts/Hz Trouble annunciator (8-A-11) to alarm.  
- TRIGGERS:
: 1. ZL_8N5R2 - Breaker 8N8 breaker closed RED lamp LIT ACTIVATES Trigger 1. This inserts a series of overrides to the Voltage Regulator manual adjustment such that Main Generator output voltage rises and prevents manual lowering of the Voltage Regulator.
: 2. ZAVMMG > 0.7 5 - Main Generator output voltage rising to 23.1 KV ACTIVATES Trigger 2. This causes the Main Generator Volts/Hz Trouble annunciator (8
-A-11) to alarm.


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 12 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 12 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE. REVIEW STATEMENTS YES NO N/A 1. Are all items on the cover page filled in correctly?
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
: 2. Has the JPM been reviewed and validated by SMEs?
REVIEW STATEMENTS YES NO N/A
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 1.
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
Are all items on the cover page filled in correctly?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 2.
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?   7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
Has the JPM been reviewed and validated by SMEs?
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non
: 3.
-Licensed Operators
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non
: 4.
-Licensed Operators
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 10. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 5.
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6.
If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8.
Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 9.
Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 12. Are all references identified, current, and accurate?
: 12. Are all references identified, current, and accurate?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered "YES" or the JPM is not valid for use. If all applicable questions are answered "YES" then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________        __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date  
Validation Personnel /Date                 Validation Personnel/Date
 
__________________________        __________________________
QF1075-01 Rev. 5 (FP-T-SAT-75)
Validation Personnel /Date                 Validation Personnel/Date
Page 13 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
__________________________        __________________________
ATTACHMENT 2 JPM Number: JPM-C.1-006 JPM
Validation Personnel /Date                 Validation Personnel/Date
 
__________________________        __________________________
==Title:==
Validation Personnel /Date                 Validation Personnel/Date
Turbine-Generator Synchronization and Loading Examinee & ID:
Evaluator:
Job
 
==Title:==
Date:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 13 of 14  JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 14 of 14 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. ATTACHMENT 2 JPM Number: JPM-C.1-006  JPM Title:
ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
Turbine-Generator Synchronization and Loading Examinee & ID:      Evaluator:
Reactor is in RUN at about 15% power with one and one-half bypass valves open.
Job Title:
Date:      Start Time Finish Time PERFORMANCE RESULTS:
SAT:  UNSAT:        COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATOR'S SIGNATURE:
NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained
.
QF1075-01 Rev. 5 (FP
-T-SAT-75)  Page 14 of 14 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
Reactor is in RUN at about 15% power with one and one
-half bypass valves open.
The Main Generator is rolling at approximately 1800 rpm ready for synchronization.
The Main Generator is rolling at approximately 1800 rpm ready for synchronization.
Main Generator Automatic Voltage Regulator is currently out of service.
Main Generator Automatic Voltage Regulator is currently out of service.
Plant Management has authorized placing the Main Turbine  
Plant Management has authorized placing the Main Turbine -Generator on line with the Voltage Regulator in the MANUAL MODE.
-Generator on line with the Voltage Regulator in the MANUAL MODE.
Procedure 2167 has been completed through step 126 Steps 121 and 125 are N/Ad due to the voltage regulator being out of service.
Procedure 2167 has been completed through step 1 26 Steps 121 and 125 are N/Ad due to the voltage regulator being out of service.
Form QF-0023 (Determination for the Use of Not Applicable) for N/Aing Steps 121 and 125 have been completed in accordance with FP-G-DOC-03 (Procedure Use and Adherence).
Form QF-0023 (Determination for the Use of Not Applicable) for N/Aing Steps 1 21 and 1 25 have been completed in accordance with FP
INITIATING CUES:
-G-DOC-03 (Procedure Use and Adherence).
CRS directs you to synchronize and load the Main Turbine-Generator commencing with Step 127 Another Operator will record Time and Dates Breaker 8N8 will be closed first.
INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.  


INITIATING CUES:
QF1075-01 Rev. 5 (FP-T-SAT-75)
CRS direct s you to synchronize and load the Main Turbine
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-Generator commencing with Step 127 Another Operator will record Time and Dates Breaker 8N8 will be closed first.
JOB PERFORMANCE MEASURE (JPM)
INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK
SITE:
.
MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
QF1075-01 Rev. 5 (FP
-T-SAT-75) Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
PERFORM THE AREA RADIATION MONITOR FUNCTIONAL TEST JPM NUMBER:
PERFORM THE AREA RADIATION MONITOR FUNCTIONAL TEST JPM NUMBER:
JPM-B.05.12-001 REV. 3   RELATED PRA INFORMATION:
JPM-B.05.12-001 REV.
None   TASK NUMBERS / TASK TITLE(S): CR272.102 Perform the Area Radiation Monitor Functional Test K/A NUMBERS:
3 RELATED PRA INFORMATION:
272000 A4.02 Rating: SRO/RO:
None TASK NUMBERS /
3.0/3.0 APPLICABLE METHOD OF TESTING:
TASK TITLE(S):
CR272.102 Perform the Area Radiation Monitor Functional Test K/A NUMBERS:
272000 A4.02 Rating: SRO/RO:
3.0/3.0 APPLICABLE METHOD OF TESTING:
Discussion:
Discussion:
Simulate/walkthrough:
Simulate/walkthrough:
Perform:   EVALUATION LOCATION:
Perform:
In-Plant:   Control Room:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Simulator:
Other:           Lab:       Time for Completion:
Other:
Lab:
Time for Completion:
25 Minutes Time Critical:
25 Minutes Time Critical:
No     Alternate Path:
No Alternate Path:
No     TASK APPLICABILITY:
No TASK APPLICABILITY:
SRO:   RO:   NLO   Additional site
SRO:
-specific signatures may be added as desired.
RO:
Developed by:             Developer Date   Validated by:
NLO Additional site-specific signatures may be added as desired.
Developed by:
Developer Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator (See JPM Validation Checklist, Attachment 1)
Date   Approved by:
Date Approved by:
Training Supervisor Date QF1075-01 Rev. 5 (FP
Training Supervisor Date  
-T-SAT-75) Page 2 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 2 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED. INITIAL CONDITIONS:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
Plant is operating at 100% power.
Plant is operating at 100% power.
Maintenance was performed on ARM Channel A1 and it requires PMT.
Maintenance was performed on ARM Channel A1 and it requires PMT.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The CRS has directed you to perform Test 1025
The CRS has directed you to perform Test 1025-A (Area Radiation Monitor Functional), Steps 1, 2, 4 and 6 for ONLY Channel A1.
-A (Area Radiation Monitor Functional), Steps 1, 2, 4 and 6 for ONLY Channel A1.
The Evaluator will act as the second operator  
The Evaluator will act as the second operator


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 3 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 3 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
JPM PERFORMANCE INFORMATION Required Materials:
Copy of Test 1025
Copy of Test 1025-A (Area Radiation Monitor Functional)
-A (Area Radiation Monitor Functional)
Initiating Approval to commence In the comments state the performance of this test is for ONLY Detector A1 to satisfy PMT following maintenance.
Initiating Approval to commence In the comments state the performance of this test is for ONLY Detector A1 to satisfy PMT following maintenance.
Check "other" as the reason for performing.
Check other as the reason for performing.
STEPS 3, 5, and 7
STEPS 3, 5, and 7-11 should be marked N/A General  
-11 should be marked N/A General  


==References:==
==References:==
Ops Manual B.05.12 ARM Alarm Setpoint Sheet (Operator Aid posted on panel)
Ops Manual B.05.12 ARM Alarm Setpoint Sheet (Operator Aid posted on panel)
Task Standards:
Task Standards:
Test 1025-A (Area Radiation Monitor Functional)
Test 1025-A (Area Radiation Monitor Functional)
Start Time:  
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Performance Step: 1 Critical: N Obtains copy of Test 1025-A, APRM Functional Standard:
Obtains copy of Test 1025-A, most recent revision.
Evaluator Cue:
Provides an initiated copy of the current revision of Test 1025-A.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  


NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
QF1075-01 Rev. 5 (FP-T-SAT-75)
IMPORTANT:
Page 4 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations
Performance Step: 2 Critical: N Procedure Step 1:
). Performance Step:
1 Critical:  N Obtains copy of Test 1025
-A, APRM Functional Standard: Obtains copy of Test 1025
-A, most recent revision.
Evaluator Cue:
Provides an initiated copy of the current revision of Test 1025
-A. Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP
-T-SAT-75) Page 4 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
2 Critical: N Procedure Step 1:
If local alarms/indication will be affected during performance of this test, And personnel will NOT be present at the local alarms/indication, Then announce over the page that Area Radiation Monitor testing will begin.
If local alarms/indication will be affected during performance of this test, And personnel will NOT be present at the local alarms/indication, Then announce over the page that Area Radiation Monitor testing will begin.
Standard: Makes plant announcement Evaluator Note:
Standard:
Makes plant announcement Evaluator Note:
This step should be simulated to minimize simulator distractions.
This step should be simulated to minimize simulator distractions.
Evaluator Cue:
Evaluator Cue:
State that the plant announcement has been made.
State that the plant announcement has been made.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
3 Critical: N Procedure Step 2.a:
Performance Step: 3 Critical: N Procedure Step 2.a:
Turn the "TRIP CHECK ADJUST" knob on the power supply fully counter
Turn the TRIP CHECK ADJUST knob on the power supply fully counter-clockwise, And then 1/4 turn clockwise.
-clockwise, And then 1/4 turn clockwise.
Standard:
Standard: Turn the "TRIP AND ADJUST" knob on the power supply fully counter
Turn the TRIP AND ADJUST knob on the power supply fully counter-clockwise, And then 1/4 turn clockwise.
-clockwise, And then 1/4 turn clockwise.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
4 Critical: Y Procedure Step 2.b:
Performance Step: 4 Critical: Y Procedure Step 2.b:
While depressing "TRIP CHECK" button on Indicator and Trip unit being tested, turn "TRIP CHECK ADJUST" knob on corresponding power supply unit slowly counter
While depressing TRIP CHECK button on Indicator and Trip unit being tested, turn TRIP CHECK ADJUST knob on corresponding power supply unit slowly counter-clockwise until the downscale trip occurs.
-clockwise until the downscale trip occurs.
Standard:
Standard: Simultaneously depress the "TRIP CHECK" button on the Indicator and Trip unit And turn the "TRIP CHECK ADJUST" knob on the power supply unit slowly counter
Simultaneously depress the TRIP CHECK button on the Indicator and Trip unit And turn the TRIP CHECK ADJUST knob on the power supply unit slowly counter-clockwise until the downscale trip occurs.
-clockwise until the downscale trip occurs.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:  
QF1075-01 Rev. 5 (FP
 
-T-SAT-75) Page 5 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-G-RM-01. Performance Step:
Page 5 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
5 Critical: N Procedure Step 2.c:
Performance Step: 5 Critical: N Procedure Step 2.c:
Record the recorder reading at which the downscale trip occurred in the column labeled "mr/hr" under SECTION I of Figure 1 (Acceptance Range  
Record the recorder reading at which the downscale trip occurred in the column labeled mr/hr under SECTION I of Figure 1 (Acceptance Range +
+ 30%). Standard: Record the recorder reading (0.1 to 0.13) at which the downscale trip occurred in the column labeled "mr/hr" under SECTION I of Figure 1.
30%).
Standard:
Record the recorder reading (0.1 to 0.13) at which the downscale trip occurred in the column labeled mr/hr under SECTION I of Figure 1.
Evaluator Cue:
Evaluator Cue:
When examinee requests the reading on the paperless digital recorder, state that it reads the same as the meter being adjusted.
When examinee requests the reading on the paperless digital recorder, state that it reads the same as the meter being adjusted.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
6 Critical: N Procedure Step 2.d:
Performance Step: 6 Critical: N Procedure Step 2.d:
Verify that the downscale alarm light on the Indicator and Trip unit is ON by recording initials in the column labeled "LT" under SECTION I of Figure 1.
Verify that the downscale alarm light on the Indicator and Trip unit is ON by recording initials in the column labeled LT under SECTION I of Figure 1.
Standard: Records initials under "LT" column.
Standard:
Records initials under LT column.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
7 Critical: N Procedure Step 2.e:
Performance Step: 7 Critical: N Procedure Step 2.e:
Verify that annunciator 4
Verify that annunciator 4-A-31 (Area Monitor Downscale) is in ALARM by recording initials in the column labeled ANN under SECTION I of Figure 1.
-A-31 (Area Monitor Downscale) is in ALARM by recording initials in the column labeled "ANN" under SECTION I of Figure 1. Standard: Records initials.
Standard:
Records initials.
Evaluator Cue:
Evaluator Cue:
State that 4
State that 4-A-31 is in alarm.
-A-31 is in alarm.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
 
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 6 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 8 Critical: Y Procedure Step 2.f:
While depressing TRIP CHECK button on indicator and trip unit being tested, turn TRIP CHECK ADJUST knob on corresponding power supply unit clockwise to just above the low trip set point, And leave in this condition.
Standard:
Adjusts trip check adjust knob.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP
Performance Step: 9 Critical: Y Procedure Step 2.g:
-T-SAT-75)  Page 6 of 15  JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Depress the RESET button on the Indicator and Trip unit, And verify the downscale light is OFF and annunciator 4-A-31 (Area Monitor Downscale) is RESET.
-G-RM-01. Performance Step:
Standard:
8 Critical: Y Procedure Step 2.f:
Verifies annunciator is reset.
While depressing "TRIP CHECK" button on indicator and trip unit being tested, turn "TRIP CHECK ADJUST" knob on corresponding power supply unit clockwise to just above the low trip set point, A nd leave in this condition.
Evaluator Cue:
Standard: Adjusts trip check adjust knob.
Inform examinee that 4-A-31 is reset.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
9 Critical: Y Procedure Step 2.g:
Performance Step: 10 Critical: N Procedure Step 2.h:
Depress the "RESET" button on the Indicator and Trip unit, A nd verify the downscale light is OFF and annunciator 4
Circle all downscale meter readings that do not fall within the acceptance criteria of +/-30% of the downscale setpoint on posted ARM setpoint sheet.
-A-31 (Area Monitor Downscale) is RESET. Standard: Verifies annunciator is reset.
Standard:
Evaluator Cue:
Circles out of acceptance readings.
Inform examinee that 4
-A-31 is reset.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
SATISFACTORY UNSATISFACTORY Comments:  
10 Critical: N Procedure Step 2.h:
 
Circle all downscale meter readings that do not fall within the acceptance criteria of  30% of the downscale setpoint on posted ARM setpoint sheet.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Standard: Circles out of acceptance readings.
Page 7 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 11 Critical: Y Procedure Step 4.a:
While depressing TRIP CHECK button on the Indicator and Trip unit being tested, turn TRIP CHECK ADJUST knob on the power supply unit clockwise until the upscale trip occurs.
Standard:
Adjusts until upscale trip occurs.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP
Performance Step: 12 Critical: N Procedure Step 4.b:
-T-SAT-75)  Page 7 of 15  JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Record the recorder reading at which the upscale trip occurred in the column labeled mr/hr under SECTION II of Figure 1.
-G-RM-01. Performance Step:
Standard:
11 Critical:  Y Procedure Step 4.a:
Records meter reading (14 to 26).
While depressing "TRIP CHECK" button on the Indicator and Trip unit being tested, turn "TRIP CHECK ADJUST" knob on the power supply unit clockwise until the upscale trip occurs.
Evaluator Cue:
Standard: Adjusts until upscale trip occurs.
Performance:
SATISFACTORY UNSATISFACTORY Comments:          Performance Step:
12 Critical: N Procedure Step 4.b:
Record the recorder reading at which the upscale trip occurred in the column labeled "mr/hr" under SECTION II of Figure 1.
Standard: Records meter reading (14 to 26)
. Evaluator Cue:
If examinee requests the reading on the paperless digital recorder, state that it reads the same as the meter being adjusted.
If examinee requests the reading on the paperless digital recorder, state that it reads the same as the meter being adjusted.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
13 Critical: N Procedure Step 4.c:
Performance Step: 13 Critical: N Procedure Step 4.c:
Verify the upscale light on the Indicator and Trip unit is ON by recording initials in the column labeled "LT" under SECTION II of Figure 1.
Verify the upscale light on the Indicator and Trip unit is ON by recording initials in the column labeled LT under SECTION II of Figure 1.
Standard: Verifies upscale light is ON.
Standard:
Verifies upscale light is ON.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:  
QF1075-01 Rev. 5 (FP
 
-T-SAT-75) Page 8 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-G-RM-01. Performance Step:
Page 8 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
14 Critical: N Procedure Step 4.d:
Performance Step: 14 Critical: N Procedure Step 4.d:
Verify the appropriate annunciator is in ALARM by recording initials in column labeled "ANN" under SECTION II of Figure 1.
Verify the appropriate annunciator is in ALARM by recording initials in column labeled ANN under SECTION II of Figure 1.
Standard: Verifies alarm and initials form.
Standard:
Verifies alarm and initials form.
Evaluator Cue:
Evaluator Cue:
Inform examinee that appropriate annunciator is in alarm.
Inform examinee that appropriate annunciator is in alarm.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
15 Critical: N Procedure Step 4.e:
Performance Step: 15 Critical: N Procedure Step 4.e:
From the SPDS display while "TRIP CHECK" button is depressed and upscale trip is in alarm, record readings in the "mr/hr" column and verify alarm condition received by recording initials in the applicable column under SECTION III of Figure 1(Acceptance Criteria  
From the SPDS display while TRIP CHECK button is depressed and upscale trip is in alarm, record readings in the mr/hr column and verify alarm condition received by recording initials in the applicable column under SECTION III of Figure 1(Acceptance Criteria + 30%).
+ 30%). Standard: Records readings from SPDS.
Standard:
Records readings from SPDS.
Evaluator Cue:
Evaluator Cue:
Inform examinee that SPDS reads 20 mr/hr.
Inform examinee that SPDS reads 20 mr/hr.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
16 Critical: Y Procedure Step 4.f:
Performance Step: 16 Critical: Y Procedure Step 4.f:
While depressing "TRIP CHECK" button on indicator and trip unit being tested, turn "TRIP CHECK ADJUST" knob on corresponding power supply unit counter-clockwise to just below the high trip set
While depressing TRIP CHECK button on indicator and trip unit being tested, turn TRIP CHECK ADJUST knob on corresponding power supply unit counter-clockwise to just below the high trip set-point, And leave in this condition.
-point, A nd leave in this condition.
Standard:
Standard: Adjusts trip check adjust knob.
Adjusts trip check adjust knob.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:  
QF1075-01 Rev. 5 (FP
 
-T-SAT-75) Page 9 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-G-RM-01. Performance Step:
Page 9 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
17 Critical: Y Procedure Step 4.g:
Performance Step: 17 Critical: Y Procedure Step 4.g:
Depress the "RESET" button on the Indicator and Trip unit, A nd verify the upscale light is OFF and appropriate annunciator is RESET.
Depress the RESET button on the Indicator and Trip unit, And verify the upscale light is OFF and appropriate annunciator is RESET.
Standard: Resets the annunciator.
Standard:
Resets the annunciator.
Evaluator Cue:
Evaluator Cue:
Inform examinee that appropriate annunciator is reset.
Inform examinee that appropriate annunciator is reset.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
18 Critical: N Procedure Step 4.h:
Performance Step: 18 Critical: N Procedure Step 4.h:
Circle all upscale meter readings that do not fall within the acceptance criteria of 30% of the upscale setpoint on posted ARM setpoint sheet. Standard: Circles out of acceptance readings.
Circle all upscale meter readings that do not fall within the acceptance criteria of +/-30% of the upscale setpoint on posted ARM setpoint sheet.
Standard:
Circles out of acceptance readings.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
19 Critical: N Procedure Step 4.i:
Performance Step: 19 Critical: N Procedure Step 4.i:
From the SPDS display, verify alarm conditions are cleared form ARMs A1 through A21, B1 through B5, C1 through C3, and D1 under SECTION III of Figure 1. Standard: Verifies alarm conditions are clear Evaluator Cue:
From the SPDS display, verify alarm conditions are cleared form ARMs A1 through A21, B1 through B5, C1 through C3, and D1 under SECTION III of Figure 1.
Standard:
Verifies alarm conditions are clear Evaluator Cue:
Inform examinee that all SPDS alarms are clear.
Inform examinee that all SPDS alarms are clear.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
20 Critical: N Procedure step 6 Announce over the page that Area Radiation Monitor testing is complete.
Performance Step: 20 Critical: N Procedure step 6 Announce over the page that Area Radiation Monitor testing is complete.
Standard: Makes plant announcement.
Standard:
Makes plant announcement.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:  
QF1075-01 Rev. 5 (FP
 
-T-SAT-75) Page 10 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-G-RM-01. Performance Step:
Page 10 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
21 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
Performance Step: 21 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
Standard: Operator informs evaluator that the task is completed.
Standard:
Operator informs evaluator that the task is completed.
Evaluator Cue:
Evaluator Cue:
Acknowledge that the task has been completed.
Acknowledge that the task has been completed.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:         Terminating Cues:
SATISFACTORY UNSATISFACTORY Comments:
Candidate informs evaluator "JPM is complete."
Terminating Cues:
Candidate informs evaluator JPM is complete.
Stop Time:  
Stop Time:  


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 11 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 11 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. Historical Record:
Historical Record:
Procedure and Template updates for 201 6 ILT NRC Exam.
Procedure and Template updates for 2016 ILT NRC Exam.  
QF1075-01 Rev. 5 (FP
 
-T-SAT-75) Page 12 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-G-RM-01. Simulator Setup (as required)
Page 12 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
: 1. This JPM can be run from the following Standard (Specific) IC sets:
Simulator Setup (as required):
Mode 1 IC   SIMULATOR INPUT  
: 1. This JPM can be run from the following Standard (Specific) IC sets:
* Mode 1 IC SIMULATOR INPUT  


==SUMMARY==
==SUMMARY==
Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger


Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 13 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 13 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the cover page filled in correctly?
REVIEW STATEMENTS YES NO N/A
: 2. Has the JPM been reviewed and validated by SMEs?
: 1.
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
Are all items on the cover page filled in correctly?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 2.
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
Has the JPM been reviewed and validated by SMEs?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 3.
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non
: 4.
-Licensed Operators
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non
: 5.
-Licensed Operators
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 10. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 6.
If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8.
Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 9.
Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 12. Are all references identified, current, and accurate?
: 12. Are all references identified, current, and accurate?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered "YES" or the JPM is not valid for use. If all applicable questions are answered "YES" then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________        __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date  
Validation Personnel /Date                 Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                 Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                 Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                 Validation Personnel/Date


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 14 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 14 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. ATTACHMENT 2 JPM Number:
ATTACHMENT 2 JPM Number: JPM-B.05.12-001 JPM
JPM-B.05.12-001   JPM Title:
 
Perform the Area Radiation Monitor Functional Test Examinee & ID:       Evaluator:
==Title:==
Job Title:
Perform the Area Radiation Monitor Functional Test Examinee & ID:
Date:       Start Time Finish Time PERFORMANCE RESULTS:
Evaluator:
SAT: UNSAT:         COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
Job
EVALUATOR'S SIGNATURE:
 
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained
==Title:==
.
Date:
QF1075-01 Rev. 5 (FP
Start Time Finish Time PERFORMANCE RESULTS:
-T-SAT-75) Page 15 of 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
SAT:
-G-RM-01. ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
 
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 15 of 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
Plant is operating at 100% power.
Plant is operating at 100% power.
Maintenance was performed on ARM Channel A1 and it requires PMT.
Maintenance was performed on ARM Channel A1 and it requires PMT.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The CRS has directed you to perform Test 1025
The CRS has directed you to perform Test 1025-A (Area Radiation Monitor Functional), Steps 1, 2, 4 and 6 for ONLY Channel A1.
-A (Area Radiation Monitor Functional), Steps 1, 2, 4 and 6 for ONLY Channel A1.
The Evaluator will act as the second operator  
The Evaluator will act as the second operator


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
JOB PERFORMANCE MEASURE (JPM)
SITE:
MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
MANUALLY INITIATE SBGT A TRAIN JPM NUMBER:
MANUALLY INITIATE SBGT A TRAIN JPM NUMBER:
JPM-B.04.02-003 REV. 10   RELATED PRA INFORMATION:
JPM-B.04.02-003 REV.
None   TASK NUMBERS / TASK TITLE(S): CR261.102 SBGT A(B) Train Quarterly Test K/A NUMBERS:
10 RELATED PRA INFORMATION:
261000 A4.07 Rating: SRO/RO:
None TASK NUMBERS /
3.2/3.1 APPLICABLE METHOD OF TESTING:
TASK TITLE(S):
CR261.102 SBGT A(B) Train Quarterly Test K/A NUMBERS:
261000 A4.07 Rating: SRO/RO:
3.2/3.1 APPLICABLE METHOD OF TESTING:
Discussion:
Discussion:
Simulate/walkthrough:
Simulate/walkthrough:
Perform:   EVALUATION LOCATION:
Perform:
In-Plant:   Control Room:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Simulator:
Other:           Lab:       Time for Completion:
Other:
Lab:
Time for Completion:
15 Minutes Time Critical:
15 Minutes Time Critical:
No     Alternate Path:
No Alternate Path:
No     TASK APPLICABILITY:
No TASK APPLICABILITY:
SRO:   RO:   NLO   Additional site
SRO:
-specific signatures may be added as desired.
RO:
NLO Additional site-specific signatures may be added as desired.
Developed by:
Developed by:
Developer Date   Validated by:
Developer Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator (See JPM Validation Checklist, Attachment 1)
Date   Approved by:
Date Approved by:
Training Supervisor Date QF1075-01 Rev. 5 (FP
Training Supervisor Date  
-T-SAT-75) Page 2 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 2 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 1,551: Line 1,767:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.  
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.  


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 3 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 3 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. INITIAL CONDITIONS:
INITIAL CONDITIONS:
The Reactor is at power SBGT needs to be manually started to support Test 0213 (Drywell To Suppression Chamber Vacuum Breaker Leakage Operational Check)
The Reactor is at power SBGT needs to be manually started to support Test 0213 (Drywell To Suppression Chamber Vacuum Breaker Leakage Operational Check)
You are the Balance of Plant operator INITIATING CUES
You are the Balance of Plant operator INITIATING CUES:
The CRS directs you to perform STEPs 1-4 of the B.04.02
The CRS directs you to perform STEPs 1-4 of the B.04.02-05.D.3 to manually initiate SBGT A Train.
-05.D.3 to manually initiate SBGT A Train.
Simulator Setup Instructions:
Simulator Setup Instructions:
No other simulator setup is needed; perform from any at
No other simulator setup is needed; perform from any at-power IC  
-power IC QF1075-01 Rev. 5 (FP
 
-T-SAT-75) Page 4 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
Page 4 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM PERFORMANCE INFORMATION Required Materials:
None General  
None General  


==References:==
==References:==
B.04.02-05 Task Standards:
B.04.02-05 Task Standards:
Manually Initiate SBGT A Train Start Time:
Manually Initiate SBGT A Train Start Time:
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT:
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP
Performance Step: 1 Critical: N Locate procedure B.04.02-05, Manually Initiate SBGT A Train Operator obtains and reviews procedure.
-T-SAT-73 (Licensed Operator Requalification Program Examinations
Standard:
). Performance Step:
Obtains appropriate procedure.
1 Critical: N Locate procedure B.04.02
-05, Manually Initiate SBGT A Train Operator obtains and reviews procedure.
Standard: Obtains appropriate procedure.
Evaluator Cue:
Evaluator Cue:
None   Performance:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
2 Critical: N Operator reviews prerequisites No painting has occurred within Reactor Building for at least 48 hours, Or If painting has occurred within 48 hours of SBGT operation, Then notify the SCTMT System Engineer to evaluate the effect on the charcoal filters.
Performance Step: 2 Critical: N Operator reviews prerequisites No painting has occurred within Reactor Building for at least 48 hours, Or If painting has occurred within 48 hours of SBGT operation, Then notify the SCTMT System Engineer to evaluate the effect on the charcoal filters.
Standard: Evaluate prerequisite Evaluator Cue:
Standard:
Evaluate prerequisite Evaluator Cue:
When asked, state that no painting has occurred in the Reactor Building for at least 48 hours.
When asked, state that no painting has occurred in the Reactor Building for at least 48 hours.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:  
QF1075-01 Rev. 5 (FP
 
-T-SAT-75) Page 5 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-G-RM-01. Performance Step:
Page 5 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
3 Critical: Y (Procedure B.04.02
Performance Step: 3 Critical: Y (Procedure B.04.02-05 D.3, STEP 1)
-05 D.3, STEP 1)
: 1. Position the following handswitches:
: 1. Position the following handswitches:
: a. HS-2945, AO-2945, to OPEN
: a. HS-2945, AO-2945, to OPEN
: b. HS-2979, AO-2979, to OPEN
: b. HS-2979, AO-2979, to OPEN
: c. HS-2955, Filter Heater E
: c. HS-2955, Filter Heater E-34A-1, to ON
-34A-1, to ON d. HS-2983A, V-EF-17A (SBGT Exh Fan), to ON Standard:
: d. HS-2983A, V-EF-17A (SBGT Exh Fan), to ON Standard:
Positions the following handswitches:
Positions the following handswitches:
HS-2945, AO-2945, to OPEN HS-2979, AO-2979, to OPEN HS-2955, Filter Heater E
HS-2945, AO-2945, to OPEN HS-2979, AO-2979, to OPEN HS-2955, Filter Heater E-34A-1, to ON HS-2983A, V-EF-17A (SBGT Exh Fan), to ON Evaluator Note:
-34A-1, to ON HS-2983A, V-EF-17A (SBGT Exh Fan), to ON Evaluator Note:
Filter heater does not come on until V-EF-17 is started.
Filter heater does not come on until V
Valves wont reposition until SBGT A is placed in Manual on the next step Evaluator Cue:
-EF-17 is started.
None Performance:
Valves won't reposition until SBGT A is placed in Manual on the next step Evaluator Cue:
SATISFACTORY UNSATISFACTORY Comments:
None   Performance:
Performance Step: 4 Critical: Y (Procedure B.04.02-05 D.3, STEP 2)
SATISFACTORY UNSATISFACTORY Comments:           Performance Step:
4 Critical: Y (Procedure B.04.02
-05 D.3, STEP 2)
: 2. Place HS-2988A, A STBY Gas Train Mode Switch, in Position 1 (MANUAL), and verify blue light ON.
: 2. Place HS-2988A, A STBY Gas Train Mode Switch, in Position 1 (MANUAL), and verify blue light ON.
Standard: Places HS-2988A in Position 1 (MANUAL)
Standard:
Places HS-2988A in Position 1 (MANUAL)
(Non-Critical portion of Standard)
(Non-Critical portion of Standard)
Verifies that blue light is on Evaluator Cue:
Verifies that blue light is on Evaluator Cue:
None   Performance:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:
 
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 6 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 5 Critical: N (Procedure B.04.02-05 D.3, STEP 3)
: 3. VERIFY red light above HS-2955 is ON.
Standard:
Verifies red light above HS-2955 is ON Evaluator Cue:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP
Performance Step: 6 Critical: N (Procedure B.04.02-05 D.3, STEP 4)
-T-SAT-75)  Page 6 of 10  JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
5 Critical: N (Procedure B.04.02
-05 D.3, STEP 3)
: 3. VERIFY red light above HS
-2955 is ON.
Standard:
Verifies red light above HS
-2955 is ON Evaluator Cue:
None  Performance:
SATISFACTORY UNSATISFACTORY Comments:          Performance Step:
6 Critical: N (Procedure B.04.02
-05 D.3, STEP 4)
: 4. VERIFY one of the following indicates flow:
: 4. VERIFY one of the following indicates flow:
: a. FIC-2943, SBGT A Loop Flow Control
: a. FIC-2943, SBGT A Loop Flow Control
: b. FIC-2942, SBGT B Loop Flow Control Standard:
: b. FIC-2942, SBGT B Loop Flow Control Standard:
Verifies flow is indicated on FIC
Verifies flow is indicated on FIC-2943 for SBGT A Loop Evaluator Cue:
-2943 for SBGT A Loop Evaluator Cue:
None Performance:
None   Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:           Performance Step:
Performance Step: 7 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
7 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
Standard:
Standard: Operator informs evaluator that the task is completed.
Operator informs evaluator that the task is completed.
Evaluator Cue:
Evaluator Cue:
Acknowledge Report Performance:
Acknowledge Report Performance:
SATISFACTORY UNSATISFACTORY Comments:           Terminating Cues:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
Stop Time:
Stop Time:
Historical Record:
Historical Record:
Revised to align with Revision 35 of B.04.02
Revised to align with Revision 35 of B.04.02-05 for the 2016 ILT NRC Exam  
-05 for the 2016 ILT NRC Exam


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 7 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 7 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. Simulator Setup (as required)
Simulator Setup (as required):
: 1. This JPM can be run from the following Standard (Specific) IC sets:
: 1. This JPM can be run from the following Standard (Specific) IC sets:
IC-* (IC-*), (IC Conditions Summary)
* IC-* (IC-*), (IC Conditions Summary)
SIMULATOR INPUT  
SIMULATOR INPUT  


==SUMMARY==
==SUMMARY==
Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger


Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 8 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 8 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the cover page filled in correctly?
REVIEW STATEMENTS YES NO N/A
: 2. Has the JPM been reviewed and validated by SMEs?
: 1.
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
Are all items on the cover page filled in correctly?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 2.
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
Has the JPM been reviewed and validated by SMEs?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 3.
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non
: 4.
-Licensed Operators
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non
: 5.
-Licensed Operators
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 10. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 6.
If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8.
Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 9.
Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 12. Are all references identified, current, and accurate?
: 12. Are all references identified, current, and accurate?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered "YES" or the JPM is not valid for use. If all applicable questions are answered "YES" then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________        __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date  
Validation Personnel /Date                 Validation Personnel/Date
 
__________________________        __________________________
QF1075-01 Rev. 5 (FP-T-SAT-75)
Validation Personnel /Date                 Validation Personnel/Date
Page 9 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
__________________________        __________________________
ATTACHMENT 2 JPM Number: JPM-B.04.02-003 JPM
Validation Personnel /Date                 Validation Personnel/Date
 
__________________________        __________________________
==Title:==
Validation Personnel /Date                 Validation Personnel/Date
Manually Initiate SBGT A Train Examinee & ID:
Evaluator:
Job
 
==Title:==
Date:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 9 of 10  JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 10 of 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. ATTACHMENT 2 JPM Number:
ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
JPM-B.04.02-003  JPM Title:
Manually Initiate SBGT A Train Examinee & ID:      Evaluator:
Job Title:
Date:      Start Time Finish Time PERFORMANCE RESULTS:
SAT:  UNSAT:        COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATOR'S SIGNATURE:
NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained
.
QF1075-01 Rev. 5 (FP
-T-SAT-75)  Page 10 of 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
The Reactor is at power SBGT needs to be manually started to support Test 0213 (Drywell To Suppression Chamber Vacuum Breaker Leakage Operational Check)
The Reactor is at power SBGT needs to be manually started to support Test 0213 (Drywell To Suppression Chamber Vacuum Breaker Leakage Operational Check)
You are the Balance of Plant operator INITIATING CUES:
You are the Balance of Plant operator INITIATING CUES:
The CRS directs you to perform STEPs 1-4 of the B.04.02
The CRS directs you to perform STEPs 1-4 of the B.04.02-05.D.3 to manually initiate SBGT A Train.  
-05.D.3 to manually initiate SBGT A Train.


QF-1075-01 Rev. 4 (FP
QF-1075-01 Rev. 4 (FP-T-SAT-75)
-T-SAT-75) Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
FIRE WATER CROSS
JOB PERFORMANCE MEASURE (JPM)
-TIE TO LPCI JPM NUMBER:
SITE:
JPM-C.5-3203-001 REV. 1 5  RELATED PRA INFORMATION:
MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
PRA-ALT-INJ-LY   TASK NUMBERS / TASK TITLE(S): CR314.110 / NL314.106 Use Alternate Injection Systems For RPV Makeup K/A NUMBERS: 295031 EA1.08 Rating: SRO/RO:
FIRE WATER CROSS-TIE TO LPCI JPM NUMBER:
3.9 / 3.8 APPLICABLE METHOD OF TESTING:
JPM-C.5-3203-001 REV.
15 RELATED PRA INFORMATION:
PRA-ALT-INJ-LY TASK NUMBERS /
TASK TITLE(S):
CR314.110 / NL314.106 Use Alternate Injection Systems For RPV Makeup K/A NUMBERS:
295031 EA1.08 Rating: SRO/RO:
3.9 / 3.8 APPLICABLE METHOD OF TESTING:
Discussion:
Discussion:
Simulate/walkthrough:
Simulate/walkthrough:
Perform:   EVALUATION LOCATION:
Perform:
In-Plant:   Control Room:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Simulator:
Other:           Lab:       Time for Completion:
Other:
1 5 Minutes Time Critical:
Lab:
No     Alternate Path:
Time for Completion:
No     TASK APPLICABILITY:
15 Minutes Time Critical:
SRO:   RO:   NLO   Additional site
No Alternate Path:
-specific signatures may be added as desired.
No TASK APPLICABILITY:
Developed by: Ronald C. Newberry Developer Date   Validated by:
SRO:
RO:
NLO Additional site-specific signatures may be added as desired.
Developed by:
Ronald C. Newberry Developer Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator (See JPM Validation Checklist, Attachment 1)
Date   Approved by:
Date Approved by:
Chris Peterson Training Supervisor Date QF-1075-01 Rev. 4 (FP
Chris Peterson Training Supervisor Date  
-T-SAT-75) Page 2 of 9 JPM-C.5-3203-001 (Fire Water Cross
 
-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF-1075-01 Rev. 4 (FP-T-SAT-75)
-G-RM-01. JPM Number:
Page 2 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM-C.5-3203-001   JPM Title:
JPM Number: JPM-C.5-3203-001 JPM
Fire Water Cross
 
-Tie To LPCI Examinee:       Evaluator:
==Title:==
Job Title:
Fire Water Cross-Tie To LPCI Examinee:
Date:      Start Time Finish Time PERFORMANCE RESULTS:
Evaluator:
SAT:  UNSAT:        COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
Job
EVALUATOR'S SIGNATURE: 


NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
==Title:==
Date:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.  


QF-1075-01 Rev. 4 (FP
QF-1075-01 Rev. 4 (FP-T-SAT-75)
-T-SAT-75) Page 3 of 9 JPM-C.5-3203-001 (Fire Water Cross
Page 3 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
JPM BRIEFING/TURNOVER Provide briefing/turnover in accordance with applicable program description and/or training procedure.
-G-RM-01. JPM BRIEFING/TURNOVER Provide briefing/turnover in accordance with applicable program description and/or training procedure.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS: An emergency condition exists requiring the use of Alternate Injection Systems for RPV Makeup.
INITIAL CONDITIONS:
An emergency condition exists requiring the use of Alternate Injection Systems for RPV Makeup.
The Diesel Fire Pump is operating supplying the Fire Header.
The Diesel Fire Pump is operating supplying the Fire Header.
RHRSW is NOT supplying RHR
RHRSW is NOT supplying RHR.
. INITIATING CUES
INITIATING CUES:
The CRS directs you to perform the IN
The CRS directs you to perform the IN-PLANT steps for lining up the Fire Water system for LPCI Injection using PART D of C.5-3203.
-PLANT steps for lining up the Fire Water system for LPCI Injection using PART D of C.5-3203. ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.
ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.
INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK
INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.
.
EVALUATOR NOTE: Some steps in this procedure require the use of a ladder. To prevent the inadvertent bumping of plant equipment, use of the ladder MUST BE SIMULATED.
EVALUATOR NOTE
 
: Some steps in this procedur e require the use of a ladder. To prevent the inadvertent bumping of plant equipment, use of the ladder MUST BE SIMULATED
QF-1075-01 Rev. 4 (FP-T-SAT-75)
.
Page 4 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF-1075-01 Rev. 4 (FP
JPM PERFORMANCE INFORMATION Required Materials:
-T-SAT-75) Page 4 of 9 JPM-C.5-3203-001 (Fire Water Cross
Copy of Procedure C.5-3203, PART D General  
-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
Copy of Procedure C.5
-3203, PART D General  


==References:==
==References:==
C.5-3203 (Use of Alternate Injection Systems for RPV Makeup), Rev. 16 Task Standards:
C.5-3203 (Use of Alternate Injection Systems for RPV Makeup), Rev. 16 Task Standards:
Fire Water has been lined up to LPCI injection in accordance with Procedure C.5
Fire Water has been lined up to LPCI injection in accordance with Procedure C.5-3203, Section D.
-3203, Section D
Start Time:
. Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
IMPORTANT:
Performance Step: 1 Critical: N Review controlled copy of Procedure C.5-3203, Section D (Fire Water Cross-Tie to LPCI).
Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations
Standard:
). Performance Step:
Reviews correct procedure and section.
1 Critical: N Review controlled copy of Procedure C.5
Evaluator Cue:
-3203, Section D (Fire Water Cross-Tie to LPCI). Standard: Reviews correct procedure and section.
Provide operator with copy of procedure C.5-3203, PART D.
Evaluator Cue: Provide operator with copy of procedure C.5-3203, PART D. Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
2 Critical: N Procedure STEP 1.
Performance Step: 2 Critical: N Procedure STEP 1.
CLOSE RHRSW
CLOSE RHRSW-13, EMER INJECTION LEAKAGE TELL TALE.
-13, EMER INJECTION LEAKAGE TELL TALE.
Standard:
Standard: Proceeds to the 931' level of the Turbine Building.
Proceeds to the 931 level of the Turbine Building.
Rotates handwheel for RHRSW-13 CW until valve is fully CLOSED
Rotates handwheel for RHRSW-13 CW until valve is fully CLOSED.
. Evaluator Cue:
Evaluator Cue:
INFORM operator that RHRSW-13 moves in clockwise direction, stem lowers, meets resistance and is tight.
INFORM operator that RHRSW-13 moves in clockwise direction, stem lowers, meets resistance and is tight.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:  
QF-1075-01 Rev. 4 (FP
 
-T-SAT-75) Page 5 of 9 JPM-C.5-3203-001 (Fire Water Cross
QF-1075-01 Rev. 4 (FP-T-SAT-75)
-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 5 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. Performance Step:
Performance Step: 3 Critical: N Procedure STEP 2.
3 Critical: N Procedure STEP 2.
Verify CLOSED the following valves:
Verify CLOSED the following valves: RHRSW-12, EMERGENCY INJECTION VIA A RHRSW LOOP.
RHRSW-12, EMERGENCY INJECTION VIA A RHRSW LOOP.
RHRSW-68, RHRSW EMERGENCY FLEX INJECTION ISOLATION VALVE. Standard: Attempts to rotate handwheel for RHRSW-12 CW. Attempts to rotate handwheel for RHRSW
RHRSW-68, RHRSW EMERGENCY FLEX INJECTION ISOLATION VALVE.
-68 CW. Evaluator Note:
Standard:
Attempts to rotate handwheel for RHRSW-12 CW.
Attempts to rotate handwheel for RHRSW-68 CW.
Evaluator Note:
A stepladder designated for this procedure is located by door 40. When operator goes to obtain the ladder, indicate that the ladder is in position.
A stepladder designated for this procedure is located by door 40. When operator goes to obtain the ladder, indicate that the ladder is in position.
Evaluator Cue:
Evaluator Cue:
When operator attempts to rotate respective handwheel, INFORM him resistance is felt and valve does NOT turn.
When operator attempts to rotate respective handwheel, INFORM him resistance is felt and valve does NOT turn.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
4 Critical: N Procedure STEP 3.
Performance Step: 4 Critical: N Procedure STEP 3.
Verify CLOSED the following valves: MO-2020, RHR DIV 1 DRYWELL SPRAY  
Verify CLOSED the following valves:
- OUTBOARD. MO-2006, RHR DIV 1 DISCHARGE TO TORUS  
MO-2020, RHR DIV 1 DRYWELL SPRAY - OUTBOARD.
- OUTBOARD. MO-2021, RHR DIV 2 DRYWELL SPRAY  
MO-2006, RHR DIV 1 DISCHARGE TO TORUS - OUTBOARD.
- OUTBOARD. MO-2007, RHR DIV 2 DISCHARGE TO TORUS  
MO-2021, RHR DIV 2 DRYWELL SPRAY - OUTBOARD.
- OUTBOARD. Standard: Contacts Control Room to verify status of the listed valves
MO-2007, RHR DIV 2 DISCHARGE TO TORUS - OUTBOARD.
. Evaluator Cue:
Standard:
Contacts Control Room to verify status of the listed valves.
Evaluator Cue:
As Control Room Operator, REPORT MO-2020, MO-2006, MO-2021 and MO-2007 indicate CLOSED.
As Control Room Operator, REPORT MO-2020, MO-2006, MO-2021 and MO-2007 indicate CLOSED.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:  
QF-1075-01 Rev. 4 (FP
 
-T-SAT-75) Page 6 of 9 JPM-C.5-3203-001 (Fire Water Cross
QF-1075-01 Rev. 4 (FP-T-SAT-75)
-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 6 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. Performance Step:
Performance Step: 5 Critical: Y Procedure STEP 4.
5 Critical: Y Procedure STEP 4.
OPEN the following valves:
OPEN the following valves:
RHRSW-46, EMERGENCY INJECTION VIA DIESEL FIRE PUMP RHRSW-14, EMERGENCY INJECTION VIA A RHRSW LOOP Standard: Rotates handwheel for RHRSW
RHRSW-46, EMERGENCY INJECTION VIA DIESEL FIRE PUMP RHRSW-14, EMERGENCY INJECTION VIA A RHRSW LOOP Standard:
-46 CCW until valve is OPEN.
Rotates handwheel for RHRSW-46 CCW until valve is OPEN.
Rotates handwheel for RHRSW
Rotates handwheel for RHRSW-14 CCW until valve is OPEN.
-14 CCW until valve is OPEN.
Evaluator Note:
Evaluator Note:
A stepladder designated for this procedure is located by door 40. When operator goes to obtain the ladder, indicate that the ladder is in position.
A stepladder designated for this procedure is located by door 40. When operator goes to obtain the ladder, indicate that the ladder is in position.
Evaluator Cue:
Evaluator Cue:
INFORM operator that the respective valve move s in the counter clockwise direction, stem rises, meets resistance and is tight.
INFORM operator that the respective valve moves in the counter clockwise direction, stem rises, meets resistance and is tight.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
6 Critical:
Performance Step: 6 Critical: N Procedure STEP 5.
N Procedure STEP 5.
If injecting through RHR-A Standard:
If injecting through RHR
Informs Control Room that Firewater is lined up to LPCI.
-AStandard: Informs Control Room that Firewater is lined up to LPCI.
Evaluator Cue:
Evaluator Cue:
When operator proceeds to Procedure Step 5, INFORM him that the Control Room will complete the procedure.
When operator proceeds to Procedure Step 5, INFORM him that the Control Room will complete the procedure.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
7 Critical N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
Performance Step: 7 Critical N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
Standard: Operator informs evaluator that the task is completed.
Standard:
Operator informs evaluator that the task is completed.
Evaluator Cue:
Evaluator Cue:
Acknowledge that the task has been completed.
Acknowledge that the task has been completed.
Evaluator Note:
Evaluator Note:
DO NOT PROMPT Performance:
DO NOT PROMPT Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:  
QF-1075-01 Rev. 4 (FP
 
-T-SAT-75) Page 7 of 9 JPM-C.5-3203-001 (Fire Water Cross
QF-1075-01 Rev. 4 (FP-T-SAT-75)
-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 7 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. Terminating Cues: Firewater is cross
Terminating Cues: Firewater is cross-tied to RHRSW.
-tied to RHRSW.
Stop Time:
Stop Time:
Historical Record:
Historical Record: Revision 15 Updated to latest standards, JPM template and procedural revisions.
Revision 15 Updated to latest standards, JPM template and procedural revisions.
Changed Performance Step 2 to NON-CRITICAL since leaving the tell-tale drain open would NOT prevent injecting Fire Water using LPCI.  
Changed Performance Step 2 to NON
-CRITICAL since leaving the tell
-tale drain open would NO T prevent injecting Fire Water using LPCI.


QF-1075-01 Rev. 4 (FP
QF-1075-01 Rev. 4 (FP-T-SAT-75)
-T-SAT-75) Page 8 of 9 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 8 of 9 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. TURNOVER SHEET INITIAL CONDITIONS:
TURNOVER SHEET INITIAL CONDITIONS:
An emergency condition exists requiring the use of Alternate Injection Systems for RPV Makeup.
An emergency condition exists requiring the use of Alternate Injection Systems for RPV Makeup.
The Diesel Fire Pump is operating supplying the Fire Header.
The Diesel Fire Pump is operating supplying the Fire Header.
RHRSW is NOT supplying RHR.
RHRSW is NOT supplying RHR.
INITIATING CUES:
INITIATING CUES:
The CRS directs you to perform the IN
The CRS directs you to perform the IN-PLANT steps for lining up the Fire Water system for LPCI Injection using PART D of C.5-3203.
-PLANT steps for lining up the Fire Water system for LPCI Injection using PART D of C.5
ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.
-3203. ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED. INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK
INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.
.
 
QF-1075-01 Rev. 4 (FP
QF-1075-01 Rev. 4 (FP-T-SAT-75)
-T-SAT-75) Page 9 of 9 JPM-C.5-3203-001 (Fire Water Cross
Page 9 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
-G-RM-01. ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A
REVIEW STATEMENTS YES NO N/A 1. Are all items on the cover page filled in correctly?
: 1.
: 2. Has the JPM been reviewed and validated by SMEs?
Are all items on the cover page filled in correctly?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 2.
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
Has the JPM been reviewed and validated by SMEs?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 3.
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 4.
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
-Licensed Operators
: 5.
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
-Licensed Operators
: 6.
: 10. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8.
Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 9.
Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 12. Are all references identified, current, and accurate?
: 12. Are all references identified, current, and accurate?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered "YES" or the JPM is not valid for use. If all applicable questions are answered "YES" then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________        __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date  
Validation Personnel /Date                 Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                 Validation Personnel/Date
____________
______________        __________________________
Validation Personnel /Date                 Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                 Validation Personnel/Date


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
JOB PERFORMANCE MEASURE (JPM)
SITE:
MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
PREPARE THE CRD SYSTEM FOR ALTERNATE BORON INJECTION JPM NUMBER:
PREPARE THE CRD SYSTEM FOR ALTERNATE BORON INJECTION JPM NUMBER:
JPM-C.5-3102-00 1 REV. 0   RELATED PRA INFORMATION:
JPM-C.5-3102-001 REV.
None   TASK NUMBERS / TASK TITLE(S): NL314.102 Perform actions associated with Alternate Boron Injection with CRD K/A NUMBERS:
0 RELATED PRA INFORMATION:
295037 EA1.10 Rating: SRO/RO:
None TASK NUMBERS /
3.7/3.9 APPLICABLE METHOD OF TESTING:
TASK TITLE(S):
NL314.102 Perform actions associated with Alternate Boron Injection with CRD K/A NUMBERS:
295037 EA1.10 Rating: SRO/RO:
3.7/3.9 APPLICABLE METHOD OF TESTING:
Discussion:
Discussion:
Simulate/walkthrough:
Simulate/walkthrough:
Perform:   EVALUATION LOCATION:
Perform:
In-Plant:   Control Room:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Simulator:
Other:           Lab:       Time for Completion:
Other:
2 0 Minutes Time Critical:
Lab:
No     Alternate Path:
Time for Completion:
No     TASK APPLICABILITY:
20 Minutes Time Critical:
SRO:   RO:   NLO   Additional site
No Alternate Path:
-specific signatures may be added as desired.
No TASK APPLICABILITY:
SRO:
RO:
NLO Additional site-specific signatures may be added as desired.
Developed by:
Developed by:
Developer Date   Validated by:
Developer Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator (See JPM Validation Checklist, Attachment 1)
Date   Approved by:
Date Approved by:
Training Supervisor Date QF1075-01 Rev. 5 (FP
Training Supervisor Date  
-T-SAT-75) Page 2 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev.0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
QF1075-01 Rev. 5 (FP-T-SAT-75)
Page 2 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev.0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 1,919: Line 2,157:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant is in a condition where boron injection is required and the SBLC system is not available. The SBLC tank is at 1500 gallons. It is filled with enriched boron solution that met the concentration requirements of Technical Specification 3.4.B. the last time it was checked.
The plant is in a condition where boron injection is required and the SBLC system is not available.
The SBLC tank is at 1500 gallons. It is filled with enriched boron solution that met the concentration requirements of Technical Specification 3.4.B. the last time it was checked.
No. 11 CRD pump is in service and No. 12 CRD pump is not running.
No. 11 CRD pump is in service and No. 12 CRD pump is not running.
You are an extra operator on shift INITIATING CUES (IF APPLICABLE):
You are an extra operator on shift INITIATING CUES (IF APPLICABLE):
The CRS directs you to prepare the CRD System for alternate boron injection using 11 CRD pump with procedure C.5
The CRS directs you to prepare the CRD System for alternate boron injection using 11 CRD pump with procedure C.5-3102 (ALTERNATE BORON INJECTION WITH CRD) Steps 1 through 2.g.
-3102 (ALTERNATE BORON INJECTION WITH CRD
Another operator will complete the procedure INFORM THE EVALUATOR WHEN THE TASK IS COMPLETE.
) Steps 1 through 2.g
ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED  
. Another operator will complete the procedure INFORM THE EVALUATOR WHEN THE TASK IS COMPLETE
. ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 3 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 3 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
JPM PERFORMANCE INFORMATION Required Materials:
C.5-3102, Part A General  
C.5-3102, Part A General  


==References:==
==References:==
C.5-3102 Task Standards:
C.5-3102 Task Standards:
Prepare the CRD System for Alternate Boron Injection Using No. 11 CRD Pump Start Time:  
Prepare the CRD System for Alternate Boron Injection Using No. 11 CRD Pump Start Time:  


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 4 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 4 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT:
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP
Performance Step: 1 Critical N Locates procedure C.5-3102 (Alternate Boron Injection With CRD).
-T-SAT-73 (Licensed Operator Requalification Program Examinations
Standard:
). Performance Step:
Locates Appropriate Procedure Evaluator Cue:
1 Critical   N Locates procedure C.5-3102 (Alternate Boron Injection With CRD)
Provide the Operator with a copy of the procedure (C.5-3102).
. Standard: Locates Appropriate Procedure Evaluator Cue: Provide the Operator with a copy of the procedure (C.5-3102). Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
2 Critical: N (Procedure STEP 1)
Performance Step: 2 Critical: N (Procedure STEP 1)
If the SBLC tank level is less than 1000 Gallons, Then fill it using PART B, And perform steps 2.a. through 2.l. of PART A concurrently.
If the SBLC tank level is less than 1000 Gallons, Then fill it using PART B, And perform steps 2.a. through 2.l. of PART A concurrently.
Standard: Operator should not perform PART B.
Standard:
(1500 gal given in initial conditions)
Operator should not perform PART B. (1500 gal given in initial conditions)
Evaluator Cue:
Evaluator Cue:
None   Performance:
None Performance:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
3 Critical: N (Procedure STEP 2a)
Performance Step: 3 Critical: N (Procedure STEP 2a)
Prepare the CRD system for alternate injection by performing the following:
Prepare the CRD system for alternate injection by performing the following:
If a CRD pump is required, Then verify 11 CRD pump is operating.
If a CRD pump is required, Then verify 11 CRD pump is operating.
Standard: Verifies 11 CRD pump operating (given in initial conditions)
Standard:
Verifies 11 CRD pump operating (given in initial conditions)
Evaluator Cue:
Evaluator Cue:
None   Performance:
None Performance:
SATISFACTORY UNSATISFACTORY Comments: ____________________________________________________________
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 5 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 5 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. Performance Step:
Performance Step: 4 Critical: N (Procedure STEP 2b)
4 Critical: N (Procedure STEP 2b)
If 12 CRD pump is operating, Then STOP 12 CRD pump.
If 12 CRD pump is operating, Then STOP 12 CRD pump.
Standard: Recognizes step is not applicable and N/As step Evaluator Cue:
Standard:
None   Performance:
Recognizes step is not applicable and N/As step Evaluator Cue:
SATISFACTORY UNSATISFACTORY Comments: _____________________________________________________________
None Performance:
Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
5 Critical: Y (Procedure STEP 2c)
Performance Step: 5 Critical: Y (Procedure STEP 2c)
Verify CLOSED the following valves:
Verify CLOSED the following valves:
CRD-2-2, 12 CRD PUMP SUCT CRD-3-2, 12 CRD PUMP DISCHARGE THROTTLE CST-147, CST CUNO FILTER OUT TO 12 CRD PUMP CRD-45, CRD PUMPS SEAL WTR XTIE CRD-7-2, 12 CRD PUMP RECIRC TO CST CRD-7-1, 11 CRD PUMP RECIRC TO CST CRD-168, CRD PUMP BYPASS ISOL Standard: 1. Closes CRD 2 by turning handwheel full travel clockwise, And 2. Closes CRD 2 by turning handwheel full travel clockwise, And 3. Closes CRD
CRD-2-2, 12 CRD PUMP SUCT CRD-3-2, 12 CRD PUMP DISCHARGE THROTTLE CST-147, CST CUNO FILTER OUT TO 12 CRD PUMP CRD-45, CRD PUMPS SEAL WTR XTIE CRD-7-2, 12 CRD PUMP RECIRC TO CST CRD-7-1, 11 CRD PUMP RECIRC TO CST CRD-168, CRD PUMP BYPASS ISOL Standard:
-45 by turning handwheel full travel clockwise, And 4. Closes CRD 2 by turning handwheel full travel clockwise, And 5. Closes CRD 1 by turning handwheel full travel clockwise And 6. Closes CRD-168 by turning handwheel full travel clockwise.
: 1. Closes CRD-2-2 by turning handwheel full travel clockwise, And
: 2. Closes CRD-3-2 by turning handwheel full travel clockwise, And
: 3. Closes CRD-45 by turning handwheel full travel clockwise, And
: 4. Closes CRD-7-2 by turning handwheel full travel clockwise, And
: 5. Closes CRD-7-1 by turning handwheel full travel clockwise And
: 6. Closes CRD-168 by turning handwheel full travel clockwise.
(Non-Critical portion of Standard)
(Non-Critical portion of Standard)
Verifies CST
Verifies CST-147 closed by noting valve stem full in and attempting to turn handwheel in the clockwise direction.
-147 closed by noting valve stem full in and attempting to turn handwheel in the clockwise direction.
Evaluator Cue:
Evaluator Cue:
: 1. For CRD-2-2, CRD-3-2, CRD-45 and CRD-168 that are open and need to be closed; the valve stems move IN, meet resistance and are tight.
: 1. For CRD-2-2, CRD-3-2, CRD-45 and CRD-168 that are open and need to be closed; the valve stems move IN, meet resistance and are tight.
Line 1,984: Line 2,224:
: 3. For CRD-7-1 and CRD-7-2;, the valve stems move IN, meet resistance and are tight.
: 3. For CRD-7-1 and CRD-7-2;, the valve stems move IN, meet resistance and are tight.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments: __________________________________________________________
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 6 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 6 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. Performance Step:
Performance Step: 6 Critical: Y (Procedure STEP 2d)
6 Critical: Y (Procedure STEP 2d)
OPEN CRD-46-2, 12 CRD PUMP OTBD VENT Standard:
OPEN CRD-46-2, 12 CRD PUMP OTBD VENT Standard: Opens CRD-46-2   Evaluator Cue:
Opens CRD-46-2 Evaluator Cue:
Valve turns CCW and then meets resistance Performance:
Valve turns CCW and then meets resistance Performance:
SATISFACTORY UNSATISFACTORY Comments: ___________________________________________________________
SATISFACTORY UNSATISFACTORY Comments:
Performance Step:
Performance Step: 7 Critical: Y (Procedure STEP 2e)
7 Critical: Y (Procedure STEP 2e)
Remove the pipe cap on the 1 in. vertical line (in CRD Pump Room between CRD-2-2 and the Y-strainer 3-15B).
Remove the pipe cap on the 1 in. vertical line (in CRD Pump Room between CRD-2-2 and the Y
Standard:
-strainer 3
Using a wrench, removes pipe cap from 1 in. line by turning CCW.
-15B). Standard: Using a wrench, removes pipe cap from 1 in. line by turning CCW.
Evaluator Note:
Evaluator Note:
Pipe wrench is located on CRD PUMP HOSE CART at top of stairway entrance to the CRD Pump room.
Pipe wrench is located on CRD PUMP HOSE CART at top of stairway entrance to the CRD Pump room.
Line 2,003: Line 2,242:
Pipe cap turns CCW, the pipe cap is removed.
Pipe cap turns CCW, the pipe cap is removed.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________________
SATISFACTORY UNSATISFACTORY Comments:
Performance Step:
Performance Step: 8 Critical: Y (Procedure STEP 2f)
8 Critical: Y (Procedure STEP 2f)
CLOSE CRD-46-2 Standard:
CLOSE CRD-46-2   Standard: Closes CRD 2   Evaluator Cue:
Closes CRD-46-2 Evaluator Cue:
Valve turns CW and then meets resistance Performance:
Valve turns CW and then meets resistance Performance:
SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________________
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 7 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 7 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. Performance Step:
Performance Step: 9 Critical: Y (Procedure STEP 2g)
9 Critical: Y (Procedure STEP 2g)
Connect the union end of the hose from the CRD PUMP HOSE CART (top of stairway entrance to CRD Pump Room) to the 1 In vertical line (in CRD Pump Room between CRD-2-2 and the Y-strainer 3-15B).
Connect the union end of the hose from the CRD PUMP HOSE CART (top of stairway entrance to CRD Pump Room) to the 1 In vertical line (in CRD Pump Room between CRD 2 and the Y
: 1. Install TEE # 1 - CRD SUCTION LINE VENT with vent valve to 1 inch vertical line. (Tee stored on CRD PUMP HOSE CART) at stairway entrance to CRD pump room.)
-strainer 3
-15B). 1. Install TEE # 1  
- CRD SUCTION LINE VENT with vent valve to 1 inch vertical line. (Tee stored on CRD PUMP HOSE CART) at stairway entrance to CRD pump room.)
: 2. Connect hose union tee.
: 2. Connect hose union tee.
: 3. Verify 1 inch vertical line vent valve is CLOSED.
: 3. Verify 1 inch vertical line vent valve is CLOSED.
Standard: Installs tee and connects union end of hose to the 1 In. vertical line by threading on and tightening with wrench in the CW direction.
Standard:
Installs tee and connects union end of hose to the 1 In. vertical line by threading on and tightening with wrench in the CW direction.
Evaluator Cue:
Evaluator Cue:
Union end of hose threads onto 1 In. vertical line, turns CW and is tight.
Union end of hose threads onto 1 In. vertical line, turns CW and is tight.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________________
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 28 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
Performance Step: 28 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
Standard: Informs evaluator that the task is completed.
Standard:
Informs evaluator that the task is completed.
Evaluator Note:
Evaluator Note:
DO NOT PROMPT Evaluator Cue:
DO NOT PROMPT Evaluator Cue:
Acknowledge task is complete Performance:
Acknowledge task is complete Performance:
SATISFACTORY UNSATISFACTORY Comments: ____________________________________________________________
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
Terminating Cues:
When report is made that the task is complete, state the JPM is complete Stop Time:
When report is made that the task is complete, state the JPM is complete Stop Time:
Historical Record:
Historical Record: New Create for the 2016 ILT NRC Exam  
New Create for the 2016 ILT NRC Exam


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 8 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 8 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. Simulator Setup (as required)
Simulator Setup (as required):
: 1. This JPM can be run from the following Standard (Specific) IC sets:
: 1. This JPM can be run from the following Standard (Specific) IC sets:
IC-* (IC-*), (IC Conditions Summary)
* IC-* (IC-*), (IC Conditions Summary)
SIMULATOR INPUT  
SIMULATOR INPUT  


==SUMMARY==
==SUMMARY==
Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger


Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 9 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 9 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the cover page filled in correctly?
REVIEW STATEMENTS YES NO N/A
: 2. Has the JPM been reviewed and validated by SMEs?
: 1.
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
Are all items on the cover page filled in correctly?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 2.
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
Has the JPM been reviewed and validated by SMEs?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 3.
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non
: 4.
-Licensed Operators
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non
: 5.
-Licensed Operators
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 10. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 6.
If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8.
Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 9.
Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 12. Are all references identified, current, and accurate?
: 12. Are all references identified, current, and accurate?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered "YES" or the JPM is not valid for use. If all applicable questions are answered "YES" then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________        __________________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date  
Validation Personnel /Date                 Validation Personnel/Date
 
__________________________        __________________________
QF1075-01 Rev. 5 (FP-T-SAT-75)
Validation Personnel /Date                 Validation Personnel/Date
Page 10 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
__________________________        __________________________
ATTACHMENT 2 JPM Number: JPM-C.5-3102-002 JPM
Validation Personnel /Date                 Validation Personnel/Date
 
__________________________        __________________________
==Title:==
Validation Personnel /Date                 Validation Personnel/Date
Prepare the CRD System for Alternate Boron Injection Examinee & ID:
Evaluator:
Job


QF1075-01 Rev. 5 (FP
==Title:==
-T-SAT-75)  Page 10 of 11  JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Date:
-G-RM-01. ATTACHMENT 2 JPM Number:
Start Time Finish Time PERFORMANCE RESULTS:
JPM-C.5-3102-002  JPM Title:
SAT:
Prepare the CRD System for Alternate Boron Injection Examinee & ID:      Evaluator:
UNSAT:
Job Title:
Date:      Start Time Finish Time PERFORMANCE RESULTS:
SAT: UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATOR'S SIGNATURE:
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
.
 
QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 11 of 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 11 of 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
The plant is in a condition where boron injection is required and the SBLC system is not available. The SBLC tank is at 1500 gallons. It is filled with enriched boron solution that met the concentration requirements of Technical Specification 3.4.B. the last time it was checked.
The plant is in a condition where boron injection is required and the SBLC system is not available.
The SBLC tank is at 1500 gallons. It is filled with enriched boron solution that met the concentration requirements of Technical Specification 3.4.B. the last time it was checked.
No. 11 CRD pump is in service and No. 12 CRD pump is not running.
No. 11 CRD pump is in service and No. 12 CRD pump is not running.
You are an extra operator on shift
You are an extra operator on shift INITIATING CUES (IF APPLICABLE):
The CRS directs you to prepare the CRD System for alternate boron injection using 11 CRD pump with procedure C.5-3102 (ALTERNATE BORON INJECTION WITH CRD) Steps 1 through 2.g.
Another operator will complete the procedure INFORM THE EVALUATOR WHEN THE TASK IS COMPLETE.
ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED


INITIATING CUES (IF APPLICABLE):
QF-1075-01 Rev. 4 (FP-T-SAT-75)
The CRS directs you to prepare the CRD System for alternate boron injection using 11 CRD pump with procedure C.5
Page 1 of 12 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-3102 (ALTERNATE BORON INJECTION WITH CRD) Steps 1 through 2.g
JOB PERFORMANCE MEASURE (JPM)
. Another operator will complete the procedure INFORM THE EVALUATOR WHEN THE TASK IS COMPLETE
SITE:
. ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED
MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
 
MANUAL CONTROL OF RHRSW CV-1729 JPM NUMBER:
QF-1075-01 Rev. 4 (FP
JPM-B.08.01.03-001 REV.
-T-SAT-75) Page 1 of 12 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
10 RELATED PRA INFORMATION:
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
None TASK NUMBERS /
MANUAL CONTROL OF RHRSW CV
TASK TITLE(S):
-1729   JPM NUMBER:
NL205.118 Take Manual Control of the RHRSW Control Valves, CV-1728 and CV-1729 upon Failure of SV-1728 or SV-1729 K/A NUMBERS:
JPM-B.08.01.03
-001 REV. 10   RELATED PRA INFORMATION:
None   TASK NUMBERS / TASK TITLE(S):
NL205.118 Take Manual Control of the RHRSW Control Valves, CV
-1728 and CV-1729 upon Failure of SV
-1728 or SV
-1729   K/A NUMBERS:
205000 A2.08 Rating: SRO/RO:
205000 A2.08 Rating: SRO/RO:
3.3/3.5 APPLICABLE METHOD OF TESTING:
3.3/3.5 APPLICABLE METHOD OF TESTING:
Discussion:
Discussion:
Simulate/walkthrough:
Simulate/walkthrough:
Perform:   EVALUATION LOCATION:
Perform:
In-Plant:   Control Room:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Simulator:
Other:           Lab:       Time for Completion:
Other:
Lab:
Time for Completion:
20 Minutes Time Critical:
20 Minutes Time Critical:
No     Alternate Path:
No Alternate Path:
N o    TASK APPLICABILITY:
No TASK APPLICABILITY:
SRO:   RO:   NLO   Additional site
SRO:
-specific signatures may be added as desired.
RO:
Developed by:             Developer Date   Validated by:
NLO Additional site-specific signatures may be added as desired.
Developed by:
Developer Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator (See JPM Validation Checklist, Attachment 1)
Date   Approved by:
Date Approved by:
Training Supervisor Date QF-1075-01 Rev. 4 (FP
Training Supervisor Date  
-T-SAT-75) Page 2 of 12 JPM-B.08.01.03
 
-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF-1075-01 Rev. 4 (FP-T-SAT-75)
-G-RM-01. JPM Number:
Page 2 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM-B.08.01.03
JPM Number: JPM-B.08.01.03-001 JPM
-001   JPM Title:
 
Manual Control of RHRSW CV
==Title:==
-1729 Examinee:       Evaluator:
Manual Control of RHRSW CV-1729 Examinee:
Job Title:
Evaluator:
Date:      Start Time Finish Time PERFORMANCE RESULTS:
Job
SAT:  UNSAT:        COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATOR'S SIGNATURE: 


NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
==Title:==
Date:
Start Time Finish Time PERFORMANCE RESULTS:
SAT:
UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.  


QF-1075-01 Rev. 4 (FP
QF-1075-01 Rev. 4 (FP-T-SAT-75)
-T-SAT-75) Page 3 of 12 JPM-B.08.01.03
Page 3 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 2,150: Line 2,403:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The Reactor is shutdown and <2 12F. The No. 12 RHR Heat Exchanger Control valve CV
The Reactor is shutdown and <212F. The No. 12 RHR Heat Exchanger Control valve CV-1729 solenoid valve SV-1729 has failed. The No. 11 and No. 13 RHR pump breakers have been previously removed for breaker maintenance. Shutdown cooling is desired at this time.
-1729 solenoid valve SV
INITIATING CUES:
-1729 has failed. The No. 11 and No. 13 RHR pump breakers have been previously removed for breaker maintenance. Shutdown cooling is desired at this time.
The Control Room Supervisor directs you to assume manual control of RHR Heat Exchanger RHRSW control valve CV-1729 in accordance with B.08.01.03-05.H.3.
ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.
INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.  


INITIATING CUES
QF-1075-01 Rev. 4 (FP-T-SAT-75)
:  The Control Room Supervisor directs you to assume manual control of RHR Heat Exchanger RHRSW control valve CV
Page 4 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-1729 in accordance with B.08.01.03
JPM PERFORMANCE INFORMATION Required Materials:
-05.H.3. ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.
Copy of Procedure B.08.01.03-05, Section H.3 (Taking Manual Control of RHRSW Control Valves CV-1728 and CV-1729 Upon Failure of SV-1728 or SV-1729)
INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK
Copy of B.08.01.03-06 Figure 2 (RHRSW Control Valve General  
.
QF-1075-01 Rev. 4 (FP
-T-SAT-75) Page 4 of 12 JPM-B.08.01.03
-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
Copy of Procedure B.08.01.03
-05, Section H.3 (Taking Manual Control of RHRSW Control Valves CV
-1728 and CV
-1729 Upon Failure of SV
-1728 or SV-1729) Copy of B.08.01.03
-06 Figure 2 (RHRSW Control Valve General  


==References:==
==References:==
 
B.08.01.03-05 (RHR Service Water System-System Operation)
B.08.01.03
-05 (RHR Service Water System
-System Operation)
Task Standards:
Task Standards:
Manual control of CV
Manual control of CV-1729 is established and valve position is set correctly for plant conditions Start Time:
-1729 is established and valve position is set correctly for plant conditions Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
IMPORTANT:
Performance Step: 1 Critical: N Locate Procedure B.08.01.03-05.H.3, "Taking Manual Control of RHRSW Control Valves, CV-1728 and CV-1729 Upon Failure of SV-1728 or SV-1729."
Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Standard:
Performance Step:
Locates and reviews the appropriate procedure.
1 Critical: N Locate Procedure B.08.01.03
-05.H.3, "Taking Manual Control of RHRSW Control Valves, CV
-1728 and CV
-1729 Upon Failure of SV
-1728 or SV-1729."   Standard: Locates and reviews the appropriate procedure.
Determines Part B is the appropriate procedure for the task Evaluator Cue:
Determines Part B is the appropriate procedure for the task Evaluator Cue:
When operator locates (or provides a verbal description of the location) controlled copy of procedure and section, PROVIDE operator copy of section H.2 of procedure B.08.01.03
When operator locates (or provides a verbal description of the location) controlled copy of procedure and section, PROVIDE operator copy of section H.2 of procedure B.08.01.03-05.
-05. Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
 
QF-1075-01 Rev. 4 (FP-T-SAT-75)
Page 5 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step: 2 Critical: Y (Procedure PART B, STEP 11)
Obtain key to unlock handwheel on CV-1729, 12 RHRSW Outlet.
Standard:
Obtains key No. 41 from operator key ring or the W.E.C.
Evaluator Cue:
If operator requests key from the W.E.C, INFORM operator that they have the key.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
QF-1075-01 Rev. 4 (FP
Performance Step: 3 Critical: N (Procedure STEP 12)
-T-SAT-75) Page 5 of 12 JPM-B.08.01.03
Establish communications between B RHR Room and Control Room Standard:
-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Establishes radio communication between the Control Room and himself from the B RHR room.
-G-RM-01. Performance Step:
2 Critical: Y (Procedure PART B, STEP 11)
Obtain key to unlock handwheel on CV
-1729, 12 RHRSW Outlet.
Standard:  Obtains key No. 41 from operator key ring or the W.E.C
. Evaluator Cue:
If operator requests key from the W.E.C, INFORM operator that they have the key
. Performance:
SATISFACTORY UNSATISFACTORY Comments:    Performance Step:
3 Critical: N (Procedure STEP 12)
Establish communications between B RHR Room and Control Room Standard: Establishes radio communication between the Control Room and himself from the B RHR room.
Evaluator Cue:
Evaluator Cue:
When operator describes where to find a radio, INFORM them that radio communication is established between Control Room and B RHR room.
When operator describes where to find a radio, INFORM them that radio communication is established between Control Room and B RHR room.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
4 Critical: Y (Procedure STEP 13)
Performance Step: 4 Critical: Y (Procedure STEP 13)
NOTE: Completion of following step will result in CV
NOTE: Completion of following step will result in CV-1729's brass handwheel screw holding valve closed via engagement with valve stem.
-1729's brass handwheel screw holding valve closed via engagement with valve stem.
Unlock the handwheel on CV-1729 (see Ops Man Section B.08.01.03-06, Figure 2 - RHRSW Control Valve),
Unlock the handwheel on CV
And turn it clockwise until resistance is felt.
-1729 (see Ops Man Section B.08.01.03
Standard:
-06, Figure 2 - RHRSW Control Valve), And turn it clockwise until resistance is felt.
Unlocks the valve handwheel for CV-1729.
Standard: Unlocks the valve handwheel for CV-1729. Rotates the valve handwheel for CV-1729 clockwise until resistance is felt. Evaluator Cue:
Rotates the valve handwheel for CV-1729 clockwise until resistance is felt.
Evaluator Cue:
Handwheel is unlocked.
Handwheel is unlocked.
CV-1729 handwheel rotates clockwise and resistance is fel
CV-1729 handwheel rotates clockwise and resistance is felt.
: t. Evaluator Note:
Evaluator Note:
Operator does not have to examine figure in Ops Manual if they are familiar with the equipment.
Operator does not have to examine figure in Ops Manual if they are familiar with the equipment.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:  
QF-1075-01 Rev. 4 (FP
 
-T-SAT-75) Page 6 of 12 JPM-B.08.01.03
QF-1075-01 Rev. 4 (FP-T-SAT-75)
-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 6 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. Performance Step:
Performance Step: 5 Critical: Y (Procedure STEP 14)
5 Critical: Y (Procedure STEP 14)
CAUTION Do not dead head pumps for more than 7 minutes.
CAUTION Do not dead head pumps for more than 7 minutes.
Turn the air supply valve to the "MANUAL" position. (See Ops Man Section B.08.01.03
Turn the air supply valve to the "MANUAL" position. (See Ops Man Section B.08.01.03-06, Figure 2 - RHRSW Control Valve for location of the air supply valve).
-06, Figure 2  
Standard:
- RHRSW Control Valve for location of the air supply valve).
Turns the air supply valve to the MANUAL position.
Standard: Turns the air supply valve to the MANUAL position.
Evaluator Cue:
Evaluator Cue:
Air supply valve is in the MANUAL position.
Air supply valve is in the MANUAL position.
Line 2,238: Line 2,473:
Operator does not have to examine Ops Manual figure if they are familiar with the equipment.
Operator does not have to examine Ops Manual figure if they are familiar with the equipment.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
6 Critical: N (Procedure STEP 15)
Performance Step: 6 Critical: N (Procedure STEP 15)
Notify Control Room of the following:
Notify Control Room of the following:
a) Control valve CV
a) Control valve CV-1729 is ready for manual operation, b) RHRSW pump may be started.
-1729 is ready for manual operation, b) RHRSW pump may be started.
Standard:
Standard: Notifies the Control Room CV
Notifies the Control Room CV-1729 is ready for manual operation, And Notifies the Control Room, the RHRSW pump is ready to be started.
-1729 is ready for manual operation, And Notifies the Control Room, the RHRSW pump is ready to be started.
Evaluator Cue:
Evaluator Cue: As the Control Room, acknowledge the report that CV-1729 is ready for manual operation and the RHRSW pump may be started.
As the Control Room, acknowledge the report that CV-1729 is ready for manual operation and the RHRSW pump may be started.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:  
QF-1075-01 Rev. 4 (FP
 
-T-SAT-75) Page 7 of 12 JPM-B.08.01.03
QF-1075-01 Rev. 4 (FP-T-SAT-75)
-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 7 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. Performance Step:
Performance Step: 7 Critical: N (Procedure STEP 16)
7 Critical: N (Procedure STEP 16)
START an RHRSW pump per Ops Man B.08.01.03-05.D.1, Startup Procedure - Startup of RHRSW Pumps.
START an RHRSW pump per Ops Man B.08.01.03
Standard:
-05.D.1, Startup Procedure  
None Evaluator Cue:
- Startup of RHRSW Pumps.
Standard: None   Evaluator Cue:
As the Control Room, INFORM the operator that Control Room Operators have started the No. 12 RHRSW pump.
As the Control Room, INFORM the operator that Control Room Operators have started the No. 12 RHRSW pump.
Evaluator Note:
Evaluator Note:
It is not the intent of this JPM for the operator to perform action in the Intake for starting of a RHRSW pump Performance:
It is not the intent of this JPM for the operator to perform action in the Intake for starting of a RHRSW pump Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
8 Critical: Y (Procedure STEP 17)
Performance Step: 8 Critical: Y (Procedure STEP 17)
Open CV-1729 to obtain the desired flow rate by turning the valve handwheel in the counterclockwise direction.
Open CV-1729 to obtain the desired flow rate by turning the valve handwheel in the counterclockwise direction.
No. of   Approximate Pumps Flowrate Valve Positio n    1 3500 gpm 55% open 2 7000 gpm 85% open   Standard: Opens CV-1729 by turning the valve handwheel CCW until valve position is at 55%. Evaluator Cue:
No. of Approximate Pumps Flowrate Valve Position 1
3500 gpm 55% open 2
7000 gpm 85% open Standard:
Opens CV-1729 by turning the valve handwheel CCW until valve position is at 55%.
Evaluator Cue:
Valve position indicates approximately 55%. Flow rate is 3500 GPM.
Valve position indicates approximately 55%. Flow rate is 3500 GPM.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:  
QF-1075-01 Rev. 4 (FP
 
-T-SAT-75) Page 8 of 12 JPM-B.08.01.03
QF-1075-01 Rev. 4 (FP-T-SAT-75)
-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 8 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. Performance Step:
Performance Step: 9 Critical: N (Procedure STEP 18)
9 Critical: N (Procedure STEP 18)
Verify that RHR HX tube-to-shell side dP is greater than 20 psid by checking DPIS-10-92B (local instrument rack), AND adjust valve position, as required.
Verify that RHR HX tube
Standard:
-to-shell side dP is greater than 20 psid by checking DPIS 92B (local instrument rack), AND adjust valve position, as required.
Verifies DP is greater than 20 psid by checking dPIS-10-92B.
Standard: Verifies DP is greater than 20 psid by checking dPIS 92B. Evaluator Cue:
Evaluator Cue:
When operator checks dPIS-10-92B, INFORM the operator that the dPIS indicates 40 psid.
When operator checks dPIS-10-92B, INFORM the operator that the dPIS indicates 40 psid.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
10 Critical: Y (Procedure STEP 19)
Performance Step: 10 Critical: Y (Procedure STEP 19)
Lock handwheel for CV-1729 in position.
Lock handwheel for CV-1729 in position.
Standard: Locks the handwheel in position.
Standard:
Locks the handwheel in position.
Evaluator Cue:
Evaluator Cue:
Handwheel is locked in position.
Handwheel is locked in position.
Line 2,286: Line 2,524:
The valve position may drift unless the handwheel is locked.
The valve position may drift unless the handwheel is locked.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
11 Critical: N (Procedure STEP 20)
Performance Step: 11 Critical: N (Procedure STEP 20)
NOTE: Valve CV-1729 is now locked in position at desired flow rate. An operator does not need to be stationed at valve continuously.
NOTE: Valve CV-1729 is now locked in position at desired flow rate. An operator does not need to be stationed at valve continuously.
Monitor system flowrate from Control Room.
Monitor system flowrate from Control Room.
Standard: None   Evaluator Cue:
Standard:
None Evaluator Cue:
Flowrate is being monitored from the Control Room.
Flowrate is being monitored from the Control Room.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:  
QF-1075-01 Rev. 4 (FP
 
-T-SAT-75) Page 9 of 12 JPM-B.08.01.03
QF-1075-01 Rev. 4 (FP-T-SAT-75)
-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 9 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. Performance Step:
Performance Step: 12 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
12 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
Standard:
Standard: Operator informs evaluator that the task is completed.
Operator informs evaluator that the task is completed.
Evaluator Cue:
Evaluator Cue:
ACKNOWLEDGE that the task has been completed.
ACKNOWLEDGE that the task has been completed.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Terminating Cues:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
Stop Time:
Stop Time:
Historical Record:
Historical Record:
Revision 11 updated JPM to newest revision of QF
Revision 11 updated JPM to newest revision of QF-1075-01  
-1075-01


QF-1075-01 Rev. 4 (FP
QF-1075-01 Rev. 4 (FP-T-SAT-75)
-T-SAT-75) Page 10 of 12 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Page 10 of 12 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. TURNOVER SHEET INITIAL CONDITIONS:
TURNOVER SHEET INITIAL CONDITIONS:
The Reactor is shutdown and <212F. The No. 12 RHR Heat Exchanger Control valve CV
The Reactor is shutdown and <212F. The No. 12 RHR Heat Exchanger Control valve CV-1729 solenoid valve SV-1729 has failed. The No. 11 and No. 13 RHR pump breakers have been previously removed for breaker maintenance. Shutdown cooling is desired at this time.
-1729 solenoid valve SV
-1729 has failed. The No. 11 and No. 13 RHR pump breakers have been previously removed for breaker maintenance. Shutdown cooling is desired at this time.
INITIATING CUES:
INITIATING CUES:
The Control Room Supervisor directs you to assume manual control of RHR Heat Exchanger RHRSW control valve CV
The Control Room Supervisor directs you to assume manual control of RHR Heat Exchanger RHRSW control valve CV-1729 in accordance with B.08.01.03-05.H.3.
-1729 in accordance with B.08.01.03
ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.
-05.H.3. ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.
INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.
INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK
 
.
QF-1075-01 Rev. 4 (FP-T-SAT-75)
QF-1075-01 Rev. 4 (FP
Page 11 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 11 of 12 JPM-B.08.01.03
Simulator Setup (as required):
-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Simulator Setup (as required):
: 1. This JPM can be run from the following Standard (Specific) IC sets:
: 1. This JPM can be run from the following Standard (Specific) IC sets:
IC-* (IC-*), (IC Conditions Summary)
* IC-* (IC-*), (IC Conditions Summary)
SIMULATOR INPUT  
SIMULATOR INPUT  


==SUMMARY==
==SUMMARY==
Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger


Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger                                                 
QF-1075-01 Rev. 4 (FP-T-SAT-75)
 
Page 12 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF-1075-01 Rev. 4 (FP
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
-T-SAT-75) Page 12 of 12 JPM-B.08.01.03
REVIEW STATEMENTS YES NO N/A
-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
: 1.
-G-RM-01. ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
Are all items on the cover page filled in correctly?
REVIEW STATEMENTS YES NO N/A 1. Are all items on the cover page filled in correctly?
: 2.
: 2. Has the JPM been reviewed and validated by SMEs?
Has the JPM been reviewed and validated by SMEs?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 3.
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 4.
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 5.
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
-Licensed Operators
: 6.
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non
If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
-Licensed Operators
: 7.
: 10. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8.
Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
: 9.
Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 12. Are all references identified, current, and accurate?
: 12. Are all references identified, current, and accurate?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered "YES" or the JPM is not valid for use. If all applicable questions are answered "YES" then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________        ___________________
Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date}}
_______ Validation Personnel /Date                 Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                 Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                 Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                 Validation Personnel/Date}}

Latest revision as of 20:39, 8 January 2025

2016 Monticello Nuclear Generating Plant Initial License Examination Proposed Control Room and In-Plant JPMs
ML17142A423
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/18/2017
From: David Reeser
NRC/RGN-III/DRS/OLB
To:
NRC/RGN-II/DRS/OLB
Shared Package
ML15274A423 List:
References
Download: ML17142A423 (125)


Text

QF1075-01 Rev. 5 (FP-T-SAT-75)

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

CONTROL ROD DRIVE EXERCISE JPM NUMBER:

JPM-0074-002 REV.

0 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

CR200.226 Respond to a drifting control rod K/A NUMBERS:

201003 A2.03 Rating: SRO/RO:

3.7/3.4 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

Time for Completion:

15 Minutes Time Critical:

No Alternate Path:

Yes TASK APPLICABILITY:

SRO:

RO:

NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 2 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 3 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

INITIAL CONDITIONS:

The plant is operating at 100% power. Control Rod Drive Exercise, Test 0074, is being performed.

The RO performing the test has performed a turnover with you.

INITIATING CUES (IF APPLICABLE):

Continue with Test 0074 at Control Rod 18-35.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 4 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM PERFORMANCE INFORMATION Required Materials:

Test 0074 initialized and completed per setup instructions Control rod position printout (from step 1 of 0074)

General

References:

0074 C.4-B.01.03.C TaskStandards:

Perform the Operator Actions for a drifting control rod Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Critical Y (0074 STEP 3) Select a withdrawn control rod by depressing the appropriate rod select pushbutton. Verify that the selected rod select pushbutton is illuminated and the selected rod indicates selection on the full-core display.

Standard:

Selects rod 18-35 Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 5 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 2 Critical Y (0074 STEP 5) Insert the selected rod one notch by momentarily placing switch 3A-S2, ROD MOVEMENT CONTROL, in ROD IN position and verify the rod position indication for the selected control rod in the single rod and the four rod group display changes to the next lower latched position.

Standard:

Places 3A-S2 in the ROD IN position.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical Y (0074 STEP 6) Withdraw the selected rod one notch by momentarily placing switch 3A-S2, ROD MOVEMENT CONTROL, in ROD OUT position and verify the rod position indication for the selected control rod in the single rod and the four rod group display changes to the next higher latched position.

Standard:

Places 3A-S2 in the ROD OUT position.

Evaluator Cue:

None Evaluator Note:

Ensure malfunction CH01_084 inserts when the candidate withdraws the rod. Rod 18-35 should start moving out.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 6 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 4 Critical N Alternate Path:

Scans the Full Core Display and determines the number of control rods that are drifting.

Standard:

Scans the Full Core Display on C-05 for the rod with the RED drifting light ON.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Critical N (C.4-B.01.03.C Procedure Step 1)

Immediate Action If more than one control rod is drifting, Then insert a manual reactor scram.

Standard:

Verifies only one rod is drifting and goes to STEP 2.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 7 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 6 Critical Y (C.4-B.01.03.C Procedure Step 2)

Immediate Action Momentarily place ROD SELECT POWER SWITCH 3A-S1 (Panel C-05) in OFF and return it to ON to de-energize the rod select matrix and de-select the drifting control rod.

Standard:

1. Turns ROD SELECT POWER SWITCH to OFF (non-critical); and
2. Then turns ROD SELECT POWER SWITCH to the ON position (Critical ONLY if power switch was turned to OFF).

(Non-Critical portion of Standard)

Operator should verify that no rod is selected after turning the switch ON.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical Y (C.4-B.01.03.C Procedure STEP 3)

Immediate Action If control rod drifting continues, Then re-select the drifting control rod, And insert and maintain the control rod at position 00 using normal or emergency insert.

Standard:

1. Drifting control rod is selected and inserted to 00 using either the NORMAL or EMERGENCY insert handswitch.
2. Drifting control rod is maintained at 00.

Evaluator Cue:

If examinee requests to release the ROD IN switch, allow them to do so the rod will drift out again forcing them to reinsert it.

Evaluator Note:

BOOTH OPERATOR: If the examinee holds the ROD IN then delete the drift out malfunction. If the examinee attempts to release the ROD IN switch do not delete the malfunction until they observe it drift out again and then reinsert the control rod.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 8 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 8 Critical N (C.4-B.01.03.C Procedure STEP 4)

Immediate Action Notify Shift Supervision.

Standard:

Notifies Shift Supervision IAW OWI-01.03.

Evaluator Cue:

Acknowledge as the CRS Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When rod 18-35 has been fully inserted and the CRS has been notified, inform the operator that the JPM is complete.

Stop Time:

Historical Record: New create for the 2016 ILT NRC Exam

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 9 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Simulator Setup (as required):

Any IC with rod 18-35 withdrawn to an intermediate position.

Verify rod 18-39 is selected Insert malfunction CH01_084 for CRD 18-35 on event 1.

Set event 1 to trigger on ZD_CRDWD.

Obtain a Control Rod position print out.

Initialize Surveillance Test 0074 SIMULATOR INPUT

SUMMARY

Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger 1

Malf CH01

_084 Control Rod 18-35 Drift out 00:00:05 Active 1

2 Malf CH01

_084 Control Rod 18-35 Drift out (Deletes in 1 second)

Active 2

Malf CH15

_084 CR 18-35 Elec DISARM DISARM

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 10 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the cover page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators

9.

Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 11 of 12 JPM-0074-002 (Control Rod Drive Exercise) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 2 JPM Number: JPM-0074-002 JPM

Title:

Control Rod Drive Exercise Examinee & ID:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 12 of 12 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

The plant is operating at 100% power. Control Rod Drive Exercise, Test 0074, is being performed.

The RO performing the test has performed a turnover with you.

INITIATING CUES (IF APPLICABLE):

Continue with Test 0074 at Control Rod 18-35.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

STARTUP THE RWCU SYSTEM JPM NUMBER:

JPM-B.02.02-001 REV.

11 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

CR204.102; NL204.101; NL204.105 Place RWCU System In Service with No. 11 RWCU Pump and 11 RWCU Filter/Demineralizer In Service K/A NUMBERS:

204000 A2.04 A4.01 Rating: SRO/RO:

2.7/2.9 3.1/3.0 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

Time for Completion:

10 Minutes Time Critical:

No Alternate Path:

No TASK APPLICABILITY:

SRO:

RO:

NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 2 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The Reactor is Shutdown and Reactor coolant temperature is <212°F. Preparation for a plant startup is in progress. The RWCU system is ready for operation.

No. 12 RWCU Filter is being backwashed and will be put in service later.

The RWCU pumps and heat exchangers are filled and vented. RBCCW and Service Air Systems are operating properly.

INITIATING CUES (IF APPLICABLE):

The Control Room Supervisor directs you to place RWCU system in service by performing STEPS 12 and 13 of the RWCU system startup procedure B.02.02-05.D.1.

Use No. 11 RWCU pump and No. 11 Filter.

All required steps prior to STEP 12 have been successfully completed.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 3 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM PERFORMANCE INFORMATION Required Materials:

Full Scope Simulator General

References:

B.02.02-05 Task Standards:

Startup the RWCU System Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Locate procedure B.02.02-05 D.1. (System Startup During Shutdown or Refueling).

Standard:

Locates appropriate procedure and steps.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 4 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 2 Critical Y (Procedure STEP 12)

CAUTION Step 13 must be performed immediately following step 12.

START a reactor water cleanup pump using the Pump A or Pump B switch for the desired pump.

Standard:

Starts 11 RWCU pump using HS-12A-S5, and after a 3 second delay notices the pump trips. Notifies Control Room Supervisor.

Evaluator Cue:

Control Room Supervisor notifies operator that an investigation will be started and to start the 12 RWCU pump.

Evaluator Note:

Do NOT give cue if operator does not notify the Control Room Supervisor.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical Y (Procedure STEP 12)

CAUTION Step 13 must be performed immediately following step 12.

START a reactor water cleanup pump using the Pump A or Pump B switch for the desired pump.

Standard:

Starts 12 RWCU pump using HS-12A-S6 and observes CLEANUP PUMP DISCH pressure rising as indicated on PI-12-131.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 5 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 4 Critical N (Procedure STEP 13)

NOTE 1: The AIR-TO-LOCK-GAUGE will indicate about 3 psig when the valve starts to open.

NOTE 2: At flow >35 gpm the HOLDING PUMP will trip and AO-12-4-37A will close.

NOTE 3: Step 13 is to be performed while in communication with the control room.

At Panel C-82, slowly turn the manual regulator knob FIC-12-4-97A, to raise flow through the filter demin to 90 GPM as indicated on FI-12-141A.

Standard:

Directs the Radwaste APEO to slowly OPEN CV-12-4-15A.

Operator should observe the following:

1.

C04-B-21, CLEAN UP FILTER DEMIN FAILURE clears.

2.

FILTER A FLOW as indicated on FI-12-141A increases to ~90 gpm Evaluator Cue:

CV-12-4-15A is open.

Evaluator Note:

The RWCU pump has no minimum flow protection. If this step is not performed, pump damage will occur.

Booth Operator INSERT TRIGGER 1 and verify flow on No. 11 RWCU F/D to rises to 90 gpm Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When 12 RWCU Pump is running with F/D flow ~90 gpm, terminate the JPM.

Stop Time:

Historical Record: Updated for 2016 ILT NRC Exam

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 6 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Simulator Setup (as required):

1. This JPM can be run from the following Standard (Specific) IC sets:
  • Cold Shutdown IC with RWCU secured
  • Create Event Trigger 2 using ZD_RUSTR(1)

SIMULATOR INPUT

SUMMARY

Manual Trigger Type Code Description Delay Ramp Value Event Trigger 1

REM RU01B 11 RWCU F/D Setpoint 00:01:00 36 MAL RU01A 11 RWCU Pump trip 00:00:03 2

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 7 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the cover page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators

9.

Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 8 of 9 JPM-B.02.02-001 (Startup the RWCU System) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 2 JPM Number: JPM-B.02.02-001 JPM

Title:

Startup the RWCU System Examinee & ID:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 9 of 9 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

The Reactor is Shutdown and Reactor coolant temperature is <212°F. Preparation for a plant startup is in progress. The RWCU system is ready for operation.

No. 12 RWCU Filter is being backwashed and will be put in service later.

The RWCU pumps and heat exchangers are filled and vented. RBCCW and Service Air Systems are operating properly.

INITIATING CUES (IF APPLICABLE):

The Control Room Supervisor directs you to place RWCU system in service by performing STEPS 12 and 13 of the RWCU system startup procedure B.02.02-05.D.1.

Use No. 11 RWCU pump and No. 11 Filter.

All required steps prior to STEP 12 have been successfully completed.INFORM EVALUATOR WHEN YOU HAVE COMPLETED THE TASK!

QF1075-01 Rev. 5 (FP-T-SAT-75)

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

k JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

OPEN THE MAIN STEAM LINE DRAINS FOLLOWING A GROUP 1 ISOLATION JPM NUMBER:

JPM-C.5-3302-003 REV.

0 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

CR239.110 Open the MSIVs Following a Group 1 Isolation K/A NUMBERS:

239001 A4.01 Rating: SRO/RO:

4.2/4.0 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

Time for Completion:

20 Minutes Time Critical:

No Alternate Path:

Yes TASK APPLICABILITY:

SRO:

RO:

NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 2 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The Reactor is in hot shutdown following a Reactor Scram due to a spurious Group 1 isolation.

The cause of the isolation is known and was determined to be INVALID INITIATING CUES (IF APPLICABLE):

The CRS directs you to perform the following:

Reset the Group 1 Isolation by performing Step 10 ONLY of C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION - GROUP 1) and THEN Restore and maintain RPV Pressure 700-750 psig IAW C.5-3302 (ALTERNATE PRESSURE CONTROL) using the Main Steam Line Drains.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 3 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM PERFORMANCE INFORMATION Required Materials:

Full Scope Simulator General

References:

C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION - GROUP 1)

C.5-3302 (ALTERNATE PRESSURE CONTROL)

Task Standards:

Reopen the MSIVs following a Group 1 isolation Start Time:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 4 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Critical: N Obtain and review procedures:

o C.4-B.04.01.A (Primary Containment Isolation - Group 1) o C.5-3302 (Alternate Pressure Control)

Standard:

Locates appropriate procedures Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 5 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 2 Critical: Y C.4-B.04.01.A, STEP 10)

When cause of isolation has been corrected, Then perform the following to allow opening of MSIVs:

a. On Panel C-03, PLACE MSIV inboard handswitches in CLOSED:

16A-S1A, AO-2-80A (11 INBD MSIV) 16A-S1B, AO-2-80B (12 INBD MSIV) 16A-S1C, AO-2-80C (13 INBD MSIV) 16A-S1D, AO-2-80D (14 INBD MSIV)

b. On Panel C-03, PLACE MSIV outboard handswitches in CLOSED:

16A-S2A, AO-2-86A (11 OTBD MSIV) 16A-S2B, AO-2-86B (12 OTBD MSIV) 16A-S2C, AO-2-86C (13 OTBD MSIV) 16A-S2D, AO-2-86D (14 OTBD MSIV)

c. On Panel C-04, VERIFY Recirc sample isolation valve handswitches in CLOSED:

16A-S7, CV-2790 (RECIRC SX LINE INBD ISOL) 16A-S8, CV-2791 (RECIRC SX LINE OTBD ISOL)

d. On Panel C-03, VERIFY Group 1 Isolation RESET using Reset pushbuttons:

16A-S32A, Main Steam Isolation Reset - Inboard 16A-S32B, Main Steam Isolation Reset - Outboard Standard:

Using C.4-B.04.01.A, candidate ensures:

1. All MSIV and sample line valve hand-switches are in the CLOSE position.
2. Pushbuttons 16-AS32A and 16A S32B have been depressed (white light indicators above pushbutton 16A S32A and 16A-S32B are lit)

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 6 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 3 Critical: N (C.5-3302, PART B Prerequisites)

1. Main Condenser available as Heat Sink.
2. One of the following:

MSIVs are OPEN OR Group 1 Isolation reset OR bypassed Standard:

Verifies perquisites are satisfied.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical: Y (C.5-3302, PART B)

1. IF MSIVs are CLOSED, THEN verify the following valves are OPEN:

NOTE: MO-2373 may be throttled to control RPV pressure.

MO-2564, STEAM LINE DRAIN DWNSTRM MSIVS MO-2373, MAIN STEAM LINE DRAIN - INBOARD MO-2374, MAIN STEAM LINE DRAIN - OUTBOARD Standard:

1. Ensures that the following valves are OPEN:

MO-2564, STEAM LINE DRAIN DWNSTRM MSIVS (Normally OPEN)

MO-2373, MAIN STEAM LINE DRAIN - INBOARD (will be closed initially due to isolation; THROTTLABE in OPEN direction only)

MO-2374, MAIN STEAM LINE DRAIN - OUTBOARD (will be closed initially due to isolation; NOT Throttlable)

2. Controls depressurization/cooldown rate by throttling MO-2373 Evaluator Cue:

None Evaluator Note:

BOOTH OPERATOR: Verify Event Trigger 1 activates. This will initiate a steam leak in the Steam Chase.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 7 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 5 Critical: N ALTERNATE PATH: ARP 3-B-56 (High Area Temp Steam Leak)

1. On C-21, MONITOR area temperatures as indicated by TR-4926, Steam Leak Detection Recorder, and DETERMINE affected area(s).

Standard:

1. Recognizes rising Steam Chase temperatures and notifies CRS.

Evaluator Cue:

When notified as CRS, acknowledge the report.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical: N ALTERNATE PATH: ARP 3-B-56

2. Refer to the following procedures:
a. C.4-B.02.04.A (Steam Leaks Outside Primary Containment)

Standard:

2. Enters C.4-B.02.04.A (Steam Leaks Outside Primary Containment)

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical: N ALTERNATE PATH: C.4-B.02.04.A

1. EVACUATE personnel from affected area.

Standard:

1. Makes page announcement to evacuate the Reactor Building Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 8 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 8 Critical: Y ALTERNATE PATH: C.4-B.02.04.A

6. If the origin of the leak is identified, Then ISOLATE if possible.

Standard:

6. Closes MO-2073 and/or MO-2074 to isolate the leak Evaluator Cue:

None Evaluator Note:

Steps 3-5 of C.4-B.02.04.A do NOT apply for the purposes of this JPM Examinee may also close MSIVs using C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION - GROUP 1 Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Critical: N ALTERNATE PATH:

Verifies On C-21, that the leak is isolated by monitoring steam chase temperatures.

Standard:

Verifies lowering steam chase temperatures on C-21 Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When the leak is isolated with MO-2073 and/or MO-2074 closed, terminate the JPM.

Stop Time:

Historical Record: New Create for the 2016 ILT NRC Exam.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 9 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Simulator Setup (as required):

Simulator Setup Instructions:

Reset to any full power IC.

Initiate a Group 1 Isolation using the malfunctions listed below Perform SCRAM Immediate Actions and EOP C.5-1100 actions to stabilize RPV water level (using FW) and pressure (using SRVs on Low-Low Set)

Set Event Trigger 1 to ZD_2374O SIMULATOR - MALFUNCTIONS:

MALF ID MALFUNCTION TITLE DELAY RAMP EVENT VALUE FINAL

1.

PP05A Spurious Group 1 - Channel A1 Active

2.

PP05C Spurious Group 1 - Channel B1 Active MS03 B Main Steam Line Rupture in Steam Tunnel 00:01:00 1

SIMULATOR - REMOTE FUNCTIONS:

REMOTE FUNC No.

REMOTE FUNCTION TITLE DELAY RAMP EVENT VALUE FINAL

1.

PC17 Group 1 B/P C.5-3017 INSTLD

2.

SIMUALTOR - OVERRIDES:

OVERRIDE ID OVERRIDE DESCRIPTION DELAY RAMP EVENT VALUE FINAL

1.
2.
3.
4.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 10 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the cover page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators

9.

Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 11 of 12 JPM-C.5-3302-003 (Open the Main steam Line Drains following a Group 1 Isolation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 2 JPM Number: JPM-3302-003 JPM

Title:

Open the Main Steam Line Drains following a Group 1 Isolation Examinee & ID:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 12 of 12 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

The Reactor is in hot shutdown following a Reactor Scram due to a spurious Group 1 isolation.

The cause of the isolation is known and was determined to be INVALID INITIATING CUES (IF APPLICABLE):

The CRS directs you to perform the following:

Reset the Group 1 Isolation by performing Step 10 ONLY of C.4-B.04.01.A (PRIMARY CONTAINMENT ISOLATION - GROUP 1) and THEN Restore and maintain RPV Pressure 700-750 psig IAW C.5-3302 (ALTERNATE PRESSURE CONTROL) using the Main Steam Line Drains.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 1 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

MANUAL SWITCHOVER OF HPCI SUCTION FROM TORUS TO CSTS JPM NUMBER:

JPM-B.03.02-005 REV.

0 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

CR206.115 Transfer HPCI Suction from Torus to CST K/A NUMBERS:

206000 (HPCI)

A2.04 Rating: SRO/RO:

3.7/3.7 Ability to manually operate and/or monitor in the control room:

Major systems valves APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

Time for Completion:

10 Minutes Time Critical:

No Alternate Path:

No TASK APPLICABILITY:

SRO:

RO:

NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 2 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

HPCI suction was transferred to the Torus for testing.

INITIATING CUES:

The CRS directs you to transfer HPCI suction from the Torus back to the CSTs in accordance with B.03.02-05.G.3 INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 3 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 JPM PERFORMANCE INFORMATION Required Materials:

Simulator General

References:

B.03.02-05, HPCI Task Standards:

HPCI suction switched from the Torus to the CSTs per B.03.02-05 G.3 Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Critical N Locates and reviews procedure B.03.02-05 G.3 (Manual Switchover of HPCI Suction from the Torus to the CSTs) and General Precautions Standard:

Obtains and reviews procedure B.03.02-05 G.3 and General Precautions Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Critical N (B.03.02-05 G.3 Step 1)

Evaluate TS 3.5.1 for HPCI inoperability during the suction transfer Standard:

Notifies CRS to evaluate TS 3.5.1 as HPCI will be inoperable during the suction transfer Evaluator Cues:

As the CRS state that TSs have been appropriately evaluated Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 4 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Performance Step: 3 Critical Y (B.03.02-05 G.3 Step 2)

Place the following handswitches to CLOSE and VERIFY dual indication:

23A-S14 MO-2061 (HPCI TORUS SUCT INBD ISOL)

Standard:

Places HS in Close for MO-2061 and verifies dual indication Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical Y (B.03.02-05 G.3 Step 2 Cont)

Place the following handswitches to CLOSE and VERIFY dual indication:

MO-2062 (HPCI TORUS SUCT INBD OTBD)

Standard:

Places HS in Close for MO-2062 and verifies dual indication.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Critical Y (B.03.02-05 G.3 Step 3)

Immediately verify OPEN MO-2063 (HPCI CST SUCTION)

Standard:

Verifies MO-2063 OPENS.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 5 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Performance Step: 6 Critical N (B.03.02-05 G.2 Step 4)

Verify fully CLOSED MO-2061 MO-2062 Standard:

Verifies both valves are fully closed Evaluator Cues:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical N (B.03.02-05 G.3 Step 5)

Evaluate TS 3.5.1 for HPCI operability Standard:

Notifies CRS to evaluate TS 3.5.1 Evaluator Cues:

As the CRS state that TSs have been appropriately evaluated Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

The candidate informs the evaluator that the task is complete.

Stop Time:

Historical Record:

New create for the 2016 ILT NRC Exam

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 6 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Simulator Setup (as required):

1. This JPM can be run from the following Standard (Specific) IC sets:
  • Any IC with the HPCI suction aligned to the Torus and CST level >2.5 SIMULATOR INPUT

SUMMARY

Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 7 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the cover page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators

9.

Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 8 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 9 of 10 JPM-B.03.02-005 (Manual Switchover of HPCI Suction from Torus to CSTs) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 2 JPM Number: JPM-B.03.02-005 JPM

Title:

Manual Switchover of HPCI Suction from Torus to CSTs Examinee & ID:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 10 of 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

HPCI suction was transferred to the Torus for testing.

INITIATING CUES:

The CRS directs you to transfer HPCI suction from the Torus back to the CSTs in accordance with B.03.02-05.G.3 INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

MANUALLY INSERT A GROUP 5 ISOLATION JPM NUMBER:

JPM-B.02.03-011 REV.

2 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

CR217.115 Open RCIC Steam Line Isolation Valves MO-2075 and MO-2076 CR200.161 Perform the Procedure for Primary Containment Group 5 Isolation K/A NUMBERS:

223002 A4.02 Rating: SRO/RO:

3.8 / 3.9 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

Time for Completion:

10 Minutes Time Critical:

No Alternate Path:

Yes TASK APPLICABILITY:

SRO:

RO:

NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 2 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

Plant is operating in Mode 1.

RCIC was isolated for maintenance and is in the process of being restored.

RP has been notified.

INITIATING CUES:

CRS has directed you to open MO-2075 and MO-2076 in accordance with the B.02.03-05.G.5.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 3 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM PERFORMANCE INFORMATION Required Materials:

None General

References:

B.02.03-05 (Reactor Core Isolation Cooling - System Operation), Rev. 31 C.4-B.04.01.E (Primary Containment Isolation - Group 5), Rev. 12 C.6-004-A-05 (RCIC Steam Line Hi Diff Press), Rev. 3 Task Standards:

MO-2075 and MO-2076 opened in accordance with B.02.03-05, section G.5 with the Group 5 isolation subsequently inserted in accordance with C.4-B.04.01.E.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Critical: N Obtain and review Procedure B.02.03-05, Section G.5 (Opening RCIC Steam Line Isolation Valves MO-2075 and MO-2076).

PREREQUISITES

1. No Group V isolation signal is present
2. RP personnel notified to address necessary controls for changing rad conditions in the RCIC Room Standard:

Obtains and reviews correct procedure and section.

Evaluator Cue:

State RP has been notified Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 4 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 2 Critical: N Procedure Step 1.

VERIFY Radiation Protection personnel have addressed necessary controls for changing radiological conditions in RCIC Room.

Standard:

Based on Initial Conditions, marks this step as complete.

Evaluator Cue:

If asked, INFORM Operator that RP has been notified.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical: N Procedure Step 2.

VERIFY valves CV-2082A and CV-2082B, RCIC Steam Line Drain to Main Condenser, are OPEN.

Standard:

Observes RED indicating lights for CV-2082A & CV-2082B are ON and GREEN lights are OFF.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical: Y Procedure Step 3.

Fully OPEN MO-2076, RCIC Steam Line Isolation Outboard.

a. If MO-2076 does NOT fully OPEN and dual indication is received, Then CLOSE MO-2076.
1) Attempt to OPEN MO-2076 on additional time.

Standard:

Opens MO-2076 by momentarily rotating control switch 13A-S3 CW to the OPEN position.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 5 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 5 Critical: Y Procedure Step 4.

CAUTION Opening MO-2075 too fast could cause the high flow switches to isolate the steam line or cause a steam hammer.

JOG OPEN RCIC inboard steam line isolation valve MO-2075 to slowly pressurize the RCIC steam line.

Standard:

Jogs Open MO-2075 by momentarily rotating control switch 13A-S1 CW to the OPEN position such that the RCIC Steam Line starts to pressurize.

Non-critical Portion:

Reports RCIC STEAM LINE HI DIFF PRESS annunciator 4-A-05 and Reactor Building Hi Radiation annunciator 4-A-11 and refers to ARP.

Evaluator Cue:

Floor Instructor: As CRS, ACKNOWLEDGE report.

Simulator Operator: When RCIC steam line pressurizes to 500 psig, VERIFY TRIGGER 1 INSERTS. This causes a RCIC Steam Line rupture.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical: N C.6-004-A-05, Steps 1 & 2.

VERIFY automatic actions have initiated.

Standard:

Reports that MO-2075 and MO-2076 did not auto-close.

Obtains and reviews Procedure C.4-B.04.01.E (Primary Containment Isolation - Group 5).

Evaluator Note:

Operator may use the VERIFY automatic actions portion of the ARP as guidance to shut MO-2075 and MO-2076. If so, this satisfies Critical Performance Step 7 of the JPM.

Evaluator Cue:

As CRS, ACKNOWLEDGE the report.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 6 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 7 Critical: Y C.4-B.04.01.E, Subsequent Operator Action Step 1.

VERIFY the following RCIC valves CLOSE:

a. MO-2075, RCIC Steam Supply Inbd Isol (Panel C-04)
b. MO-2076, RCIC Steam Supply Otbd Isol (Panel C-04)

Standard:

Closes MO-2075 OR MO-2076 by momentarily rotating respective control switch 13A-S1/13A-S2 CCW to the CLOSE position.

Evaluator Note:

Since either valve will effectively isolate the leak and clear the alarm, closing either valve will satisfy the Critical Step.

Evaluator Cue:

As CRS, ACKNOWLEDGE report and INFORM Operator another Operator will complete the remaining steps of this procedure.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

RCIC Steam Line has been isolated and RCIC STEAM LINE HI DIFF PRESS alarm 4-A-05 cleared.

Stop Time:

Historical Record: Updated for the 2016 ILT NRC Exam

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 7 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Simulator Setup (as required):

1. This JPM can be run from the following Standard (Specific) IC sets:
  • Initialize to a Mode 1 IC.
  • Close Inboard RCIC isolation valve MO-2075.
  • Close Trip Throttle valve MO-2080.
  • De-pressurize the line by momentarily placing the handswitch for CV-2079 to OPEN.
  • Once steam line is depressurized return CV-2079 to Close.
  • Close Outboard RCIC isolation valve MO-2076.
  • Insert malfunctions listed in below table.

SIMULATOR - MALFUNCTIONS:

MALF ID MALFUNCTION TITLE DELAY RAMP EVENT FINAL VALUE

1.

RC08 FAILURE OF RCIC TO AUTO ISOLATE (GRP5) 00:00:00 00:00:00 None Active Active

2.

RC07 RCIC STEAM LINE LEAK 00:00:00 00:00:00 1

100 0

SIMULATOR - REMOTE FUNCTIONS:

None.

SIMULATOR - OVERRIDES:

None.

SIMULATOR - TRIGGERS:

1. ZARCPDRN > 0.333 - RCIC Steam Line Pressure > 500 PSIG activates Trigger 1 which causes a RCIC Steam Line rupture.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 8 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the cover page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators

9.

Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 9 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 10 of 11 JPM-B.02.03-011 (Manually Insert a Group 5 Isolation) Rev. 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 2 JPM Number: JPM-B.02.03-011 JPM

Title:

Manually Insert a Group 5 Isolation Examinee & ID:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 11 of 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

Plant is operating in Mode 1.

RCIC was isolated for maintenance and is in the process of being restored.

RP has been notified.

INITIATING CUES:

CRS has directed you to open MO-2075 and MO-2076 in accordance with the B.02.03-05.G.5.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

TURBINE-GENERATOR SYNCHRONIZATION AND LOADING JPM NUMBER:

JPM-C.1-006 REV.

5 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

CR200.126 Synchronize and load the Turbine-Generator K/A NUMBERS:

700000 AA2.08 Rating: SRO/RO:

4.4/4.3 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

Time for Completion:

15 Minutes Time Critical:

No Alternate Path:

Yes TASK APPLICABILITY:

SRO:

RO:

NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 2 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

Reactor is in RUN at about 15% power with one and one-half bypass valves open.

The Main Generator is rolling at approximately 1800 rpm ready for synchronization.

Main Generator Automatic Voltage Regulator is currently out of service.

Plant Management has authorized placing the Main Turbine -Generator on line with the Voltage Regulator in the MANUAL MODE.

Procedure 2167 has been completed through step 126 Steps 121 and 125 are N/Ad due to the voltage regulator being out of service.

Form QF-0023 (Determination for the Use of Not Applicable) for N/Aing Steps 121 and 125 have been completed in accordance with FP-G-DOC-03 (Procedure Use and Adherence).

INITIATING CUES:

CRS directs you to synchronize and load the Main Turbine-Generator commencing with Step 127 Another Operator will record Time and Dates Breaker 8N8 will be closed first.

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 3 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM PERFORMANCE INFORMATION Required Materials:

Marked up copy of 2167 (Part I) showing Steps 119, 120, 122, 123, 124 and 126 completed and Steps 121 and 125 marked as N/A.

General

References:

2167 (Plant Startup)

C.6-008-A-11 (Main Generator Volts/Hz Trouble)

FP-G-DOC-03 (Procedure Use and Adherence)

QF-0023 (Determination for the Use of Not Applicable)

Task Standards:

Main Turbine-Generator has been synchronized to the grid and loaded to ~30 MWe in accordance with 2167 with subsequent manual trip of Main Generator in accordance with C.6-008-A-11 when Voltage Regulator fails such that Generator output voltage exceeds 23.6 KV Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Critical: N Obtain and review Procedure 2167 Part I (Turbine-Generator Synchronization and Loading).

Standard:

Reviews correct procedure and section.

Evaluator Cue:

PROVIDE operator with Marked up copy of 2167 (Part I) showing Steps 119, 120, 122, 123, 124 and 126 completed and Steps 121 and 125 marked as N/A.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 4 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 2 Critical: Y Procedure Step 127.

Place Synchronizing switch to ON, for one of Generator Output Breakers:

  • 8N7/SS, Sync Main Gen Breaker No 1
  • 8N8/SS, Sync Main Gen Breaker No 2
a. OBSERVE Synchronizing pointer moving.
b. OBSERVE Synchronizing Voltmeters and sensing lights activated Standard:

Place Synchronizing switch to ON, for one of Generator Output Breakers:

  • 8N7/SS, Sync Main Gen Breaker No 1
  • 8N8/SS, Sync Main Gen Breaker No 2
a. OBSERVE Synchronizing pointer moving.
b. OBSERVE Synchronizing Voltmeters and sensing lights activated Evaluator Cue:

If necessary repeat that 8N8 should be used for synchronizing per the turnover sheet Evaluator Note:

Per the turnover sheet 8N8 should be used for synchronizing Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical: Y Procedure Step 128.

Use SLCM, Speed Load Changer, to ADJUST the Generator speed until clockwise synchronous pointer rotation established.

Standard:

Momentarily rotates control switch SLCM (located on Panel C-07) as necessary until synchroscope pointer (located on Panel C-08) is rotating CW.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 5 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 4 Critical: Y Procedure Step 129.

Adjust incoming voltage to match running voltage using 270/CS, Regulator Voltage Adjust (C-08).

Standard:

Momentarily rotates control switch 270/CS CW as necessary until incoming voltage approximately matches running voltage.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Critical: N Procedure Step 130.

If speed and voltage conditions are not met, Then Repeat Steps 128 and 129 until speed and voltage conditions are met.

Standard:

Repeats steps 128 and 129 as necessary to meet the standards indicated in Performance Steps 3 & 4.

Evaluator Note:

Candidate is allowed to return to Steps 128 and 129 as necessary to satisfy the standard.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical: N Procedure Step 131.

Allow the synchroscope to make at least two complete revolutions to verify that the synchroscope is operating properly.

Standard:

Observes the pointer on the synchroscope has completed at least two revolutions.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 6 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 7 Critical: Y Procedure Step 132 a.

When the synchroscope pointer is in the Green Band, Then perform the following (loads the generator):

a. PLACE selected Main Generator Output Breaker (8N7 or 8N8) control switch to CLOSE and HOLD.

1). When synchroscope pointer reaches 12 o-clock position, Then RELEASE Main Generator Output Breaker control switch.

2). If breaker does not close on the first attempt, Then PLACE breaker control switch in TRIP a) Verify alarm resets

a. Enter step 130 above 3). If breaker does not close on second attempt, Then DO NOT reset breaker and alarm, a) notify System Engineer.

Standard:

Momentarily rotates control switch 8N8/CS CW to the CLOSE position such that Main Generator output breaker 8N8 closes.

If breaker fails to close on the first attempt, momentarily rotates control switch 8N8/CS CCW to the TRIP position and returns to Step 132.

Evaluator Note:

Operator may utilize two attempts to close breaker. If operator is unsuccessful in closing the breaker after two attempts and the system engineer is contacted the operator can be informed that they may continue to attempt to close the breaker. This is if it appears that the operator has been attempting to correctly close the breaker while the synchroscope is in the green band. If the operator has been incorrectly attempting to sync the generator then mark this step as UNSAT and inform the operator that the JPM is complete Evaluator Cue:

Simulator Operator: When operator closes Breaker 8N8, VERIFY Trigger 1 automatically activates. This will insert the Voltage Regulator RAISE overrides which will drive Generator voltage high out of specification and prevent manual lowering of the voltage regulator.

Simulator Operator: ROLE PLAY: If contacted as System Engineer, ACKNOWLEDGE report and INFORM operator an investigation will be promptly initiated.

Floor Instructor: If operator is unsuccessful in closing the breaker after two attempts, INFORM operator JPM is complete.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 7 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 8 Critical: N Procedure Step 132.b.

Use SLCM, Speed Load Changer to immediately pick up 5% load (about 30 MWe).

Standard:

Momentarily rotates control switch SLCM CW to the RAISE position until Main Generator has been loaded to 25 - 35 MWe.

Observes Generator output on the No. 1 Main Generator Megawatt meter (Panel C-08) and/or the Main Generator Megawatt LED (Panel C-07) is reading ~30 MWe.

Evaluator Note:

MWe may exceed 35 MWe due to the voltage regulator failure. This would not be considered a failure of this step.

Based on recognition of Main Generator voltage rising, this step may not be done.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Critical: N Procedure Step 132.c.

Check generator voltage and current indications are approximately equal for each phase.

Standard:

Observes amperage readings on the three No. 1 Main Generator Phase A/B/C Kiloamp meters (Panel C-08) are approximately equal.

Rotates the Phase Voltage Select Switch VS1 (Panel C-08) CW and/or CCW as necessary and observes voltage readings on all three phases are approximately equal.

Should notice that voltage and MVAR readings are rising and reports this to the CRS.

When annunciator 8-A-11 alarms, reports alarm and pulls associated ARP.

Evaluator Cue:

Floor Instructor: If operator reports Main Generator voltage and MVAR rising and/or alarm, ACKNOWLEDGE report.

Simulator Operator: When Main Generator output voltage rises to 23.1 KV, VERIFY Trigger 2 automatically activates. This will cause the Main Generator Volts/Hz Trouble annunciator (8-A-11) to alarm.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 8 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 10 Critical: N ALTERNATE PATH Obtain and review ARP C.6-008-A-11 (Main Generator Volts/Hz Trouble).

Standard:

Announces alarm.

Obtains and reviews correct Alarm Response Procedure.

Evaluator Cue:

As CRS acknowledge communication Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 Critical: N (C.6-008-A-11) Procedure Step 1.

Perform the following:

Standard:

Starts to perform Step 1 of ARP.

Evaluator Cue:

When operator starts to perform Step 1 of the ARP, INFORM him another operator has completed Step 1.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 Critical: N (C.6-008-A-11) Procedure Step 2.

If the Generator is ON-LINE, Then reduce excitation to lower generator output voltage to < 23.1 KV.

Standard:

Momentarily rotates control switch 270/CS CCW to the LOWER position.

Observes no response from the Voltage Regulator.

Observes Main Generator voltage and MVARs continue to rise.

Evaluator Cue:

As CRS acknowledge communication Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 9 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 13 Critical: Y (C.6-008-A-11) Procedure Step 2.a.

If actions taken to lower output voltage are not effective, And Generator output voltage is 23.6 KV, Then trip the Generator using the GENERATOR EMERGENCY TRIP handswitch. (C-08).

Standard:

Momentarily rotates control switch GT/CS CW or CCW to the TRIP position.

Evaluator Cue:

Floor Instructor: As CRS, ACKNOWLEDGE report.

Floor Instructor: When operator trips the Main Generator, INFORM him another operator will complete remaining portions of procedures.

Simulator Operator: When Operator trips Main Generator, VERIFY Triggers 3 and/or 4 automatically activate. This will delete the Main Generator voltage indication override.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When the Main Generator is manually tripped inform the operator that the JPM is complete Stop Time:

Historical Record:

Updated for 2167 Revision 94 and 2016 ILT NRC Exam Removed Performance Steps for 2167 that are not performed due to the alternate path

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 10 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Simulator Setup (as required):

1. This JPM can be run from the following Standard (Specific) IC sets:

Initialize to a startup IC-171 or IC with Reactor Power at ~15% and Turbine at ~1800 RPM and ready for synchronization.

Ensure the AUTO/MAN REGULATOR SELECTOR switch is in the MAN position with the WHITE light ON.

Ensure the Power Stabilizer is removed from service.

Acknowledge alarm 8-A-31 (Voltage Regulator Manual Mode) and hang caution tag on the AUTO/MAN REGULATOR SELECTOR switch.

Adjust Voltage Regulator and Speed/Load Changer as necessary such that incoming voltage is ~2 volts less than running voltage and synchroscope is moving slowly in the counterclockwise direction.

Ensure the Turbine Speed & Bypass Valve Cam Position recorder is selected for the Turbine Speed display.

Insert malfunctions & triggers listed in below tables.

SIMULATOR - MALFUNCTIONS:

MALF ID MALFUNCTION TITLE DELAY RAMP EVENT FINAL VALUE

1.

C-08-A11 MAIN GENERATOR VOLTZ/HZ TROUBLE 00:00:00 00:00:00 2

Active InActive SIMULATOR - REMOTE FUNCTIONS:

None SIMULATOR - OVERRIDES:

OVR ID MALFUNCTION TITLE DELAY RAMP EVENT FINAL VALUE

1.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:00:00 00:00:00 1

True False

2.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:00:07 00:00:00 1

True False

3.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:00:14 00:00:00 1

True False

4.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:00:21 00:00:00 1

True False

5.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:00:28 00:00:00 1

True False

6.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:00:35 00:00:00 1

True False

7.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:00:42 00:00:00 1

True False

8.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:00:49 00:00:00 1

True False

9.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:00:56 00:00:00 1

True False

10.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:01:03 00:00:00 1

True False

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 11 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

OVR ID MALFUNCTION TITLE DELAY RAMP EVENT FINAL VALUE

11.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:01:10 00:00:00 1

True False

12.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:01:17 00:00:00 1

True False

13.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:01:24 00:00:00 1

True False

14.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:01:31 00:00:00 1

True False

15.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:01:38 00:00:00 1

True False

16.

05-S069-02 MANUAL VOLTAGE ADJUST -

RAISE (DELETE IN 5 SECONDS) 00:01:45 00:00:00 1

True False

17.

05-S069-01 MANUAL VOLTAGE ADJUST -

LOWER 00:00:00 00:00:00 1

False False SIMULATOR - TRIGGERS:

1.

ZL_8N5R2 - Breaker 8N8 breaker closed RED lamp LIT ACTIVATES Trigger 1. This inserts a series of overrides to the Voltage Regulator manual adjustment such that Main Generator output voltage rises and prevents manual lowering of the Voltage Regulator.

2.

ZAVMMG > 0.75 - Main Generator output voltage rising to 23.1 KV ACTIVATES Trigger 2. This causes the Main Generator Volts/Hz Trouble annunciator (8-A-11) to alarm.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 12 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the cover page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators

9.

Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 13 of 14 JPM-C.1-006 (Turbine-Generator Synchronization And Loading) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 2 JPM Number: JPM-C.1-006 JPM

Title:

Turbine-Generator Synchronization and Loading Examinee & ID:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 14 of 14 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

Reactor is in RUN at about 15% power with one and one-half bypass valves open.

The Main Generator is rolling at approximately 1800 rpm ready for synchronization.

Main Generator Automatic Voltage Regulator is currently out of service.

Plant Management has authorized placing the Main Turbine -Generator on line with the Voltage Regulator in the MANUAL MODE.

Procedure 2167 has been completed through step 126 Steps 121 and 125 are N/Ad due to the voltage regulator being out of service.

Form QF-0023 (Determination for the Use of Not Applicable) for N/Aing Steps 121 and 125 have been completed in accordance with FP-G-DOC-03 (Procedure Use and Adherence).

INITIATING CUES:

CRS directs you to synchronize and load the Main Turbine-Generator commencing with Step 127 Another Operator will record Time and Dates Breaker 8N8 will be closed first.

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

PERFORM THE AREA RADIATION MONITOR FUNCTIONAL TEST JPM NUMBER:

JPM-B.05.12-001 REV.

3 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

CR272.102 Perform the Area Radiation Monitor Functional Test K/A NUMBERS:

272000 A4.02 Rating: SRO/RO:

3.0/3.0 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

Time for Completion:

25 Minutes Time Critical:

No Alternate Path:

No TASK APPLICABILITY:

SRO:

RO:

NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 2 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

Plant is operating at 100% power.

Maintenance was performed on ARM Channel A1 and it requires PMT.

INITIATING CUES (IF APPLICABLE):

The CRS has directed you to perform Test 1025-A (Area Radiation Monitor Functional), Steps 1, 2, 4 and 6 for ONLY Channel A1.

The Evaluator will act as the second operator

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 3 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM PERFORMANCE INFORMATION Required Materials:

Copy of Test 1025-A (Area Radiation Monitor Functional)

Initiating Approval to commence In the comments state the performance of this test is for ONLY Detector A1 to satisfy PMT following maintenance.

Check other as the reason for performing.

STEPS 3, 5, and 7-11 should be marked N/A General

References:

Ops Manual B.05.12 ARM Alarm Setpoint Sheet (Operator Aid posted on panel)

Task Standards:

Test 1025-A (Area Radiation Monitor Functional)

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Critical: N Obtains copy of Test 1025-A, APRM Functional Standard:

Obtains copy of Test 1025-A, most recent revision.

Evaluator Cue:

Provides an initiated copy of the current revision of Test 1025-A.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 4 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 2 Critical: N Procedure Step 1:

If local alarms/indication will be affected during performance of this test, And personnel will NOT be present at the local alarms/indication, Then announce over the page that Area Radiation Monitor testing will begin.

Standard:

Makes plant announcement Evaluator Note:

This step should be simulated to minimize simulator distractions.

Evaluator Cue:

State that the plant announcement has been made.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical: N Procedure Step 2.a:

Turn the TRIP CHECK ADJUST knob on the power supply fully counter-clockwise, And then 1/4 turn clockwise.

Standard:

Turn the TRIP AND ADJUST knob on the power supply fully counter-clockwise, And then 1/4 turn clockwise.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical: Y Procedure Step 2.b:

While depressing TRIP CHECK button on Indicator and Trip unit being tested, turn TRIP CHECK ADJUST knob on corresponding power supply unit slowly counter-clockwise until the downscale trip occurs.

Standard:

Simultaneously depress the TRIP CHECK button on the Indicator and Trip unit And turn the TRIP CHECK ADJUST knob on the power supply unit slowly counter-clockwise until the downscale trip occurs.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 5 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 5 Critical: N Procedure Step 2.c:

Record the recorder reading at which the downscale trip occurred in the column labeled mr/hr under SECTION I of Figure 1 (Acceptance Range +

30%).

Standard:

Record the recorder reading (0.1 to 0.13) at which the downscale trip occurred in the column labeled mr/hr under SECTION I of Figure 1.

Evaluator Cue:

When examinee requests the reading on the paperless digital recorder, state that it reads the same as the meter being adjusted.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical: N Procedure Step 2.d:

Verify that the downscale alarm light on the Indicator and Trip unit is ON by recording initials in the column labeled LT under SECTION I of Figure 1.

Standard:

Records initials under LT column.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical: N Procedure Step 2.e:

Verify that annunciator 4-A-31 (Area Monitor Downscale) is in ALARM by recording initials in the column labeled ANN under SECTION I of Figure 1.

Standard:

Records initials.

Evaluator Cue:

State that 4-A-31 is in alarm.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 6 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 8 Critical: Y Procedure Step 2.f:

While depressing TRIP CHECK button on indicator and trip unit being tested, turn TRIP CHECK ADJUST knob on corresponding power supply unit clockwise to just above the low trip set point, And leave in this condition.

Standard:

Adjusts trip check adjust knob.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Critical: Y Procedure Step 2.g:

Depress the RESET button on the Indicator and Trip unit, And verify the downscale light is OFF and annunciator 4-A-31 (Area Monitor Downscale) is RESET.

Standard:

Verifies annunciator is reset.

Evaluator Cue:

Inform examinee that 4-A-31 is reset.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Critical: N Procedure Step 2.h:

Circle all downscale meter readings that do not fall within the acceptance criteria of +/-30% of the downscale setpoint on posted ARM setpoint sheet.

Standard:

Circles out of acceptance readings.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 7 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 11 Critical: Y Procedure Step 4.a:

While depressing TRIP CHECK button on the Indicator and Trip unit being tested, turn TRIP CHECK ADJUST knob on the power supply unit clockwise until the upscale trip occurs.

Standard:

Adjusts until upscale trip occurs.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 Critical: N Procedure Step 4.b:

Record the recorder reading at which the upscale trip occurred in the column labeled mr/hr under SECTION II of Figure 1.

Standard:

Records meter reading (14 to 26).

Evaluator Cue:

If examinee requests the reading on the paperless digital recorder, state that it reads the same as the meter being adjusted.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 Critical: N Procedure Step 4.c:

Verify the upscale light on the Indicator and Trip unit is ON by recording initials in the column labeled LT under SECTION II of Figure 1.

Standard:

Verifies upscale light is ON.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 8 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 14 Critical: N Procedure Step 4.d:

Verify the appropriate annunciator is in ALARM by recording initials in column labeled ANN under SECTION II of Figure 1.

Standard:

Verifies alarm and initials form.

Evaluator Cue:

Inform examinee that appropriate annunciator is in alarm.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 15 Critical: N Procedure Step 4.e:

From the SPDS display while TRIP CHECK button is depressed and upscale trip is in alarm, record readings in the mr/hr column and verify alarm condition received by recording initials in the applicable column under SECTION III of Figure 1(Acceptance Criteria + 30%).

Standard:

Records readings from SPDS.

Evaluator Cue:

Inform examinee that SPDS reads 20 mr/hr.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 16 Critical: Y Procedure Step 4.f:

While depressing TRIP CHECK button on indicator and trip unit being tested, turn TRIP CHECK ADJUST knob on corresponding power supply unit counter-clockwise to just below the high trip set-point, And leave in this condition.

Standard:

Adjusts trip check adjust knob.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 9 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 17 Critical: Y Procedure Step 4.g:

Depress the RESET button on the Indicator and Trip unit, And verify the upscale light is OFF and appropriate annunciator is RESET.

Standard:

Resets the annunciator.

Evaluator Cue:

Inform examinee that appropriate annunciator is reset.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 18 Critical: N Procedure Step 4.h:

Circle all upscale meter readings that do not fall within the acceptance criteria of +/-30% of the upscale setpoint on posted ARM setpoint sheet.

Standard:

Circles out of acceptance readings.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 19 Critical: N Procedure Step 4.i:

From the SPDS display, verify alarm conditions are cleared form ARMs A1 through A21, B1 through B5, C1 through C3, and D1 under SECTION III of Figure 1.

Standard:

Verifies alarm conditions are clear Evaluator Cue:

Inform examinee that all SPDS alarms are clear.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 20 Critical: N Procedure step 6 Announce over the page that Area Radiation Monitor testing is complete.

Standard:

Makes plant announcement.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 10 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 21 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Standard:

Operator informs evaluator that the task is completed.

Evaluator Cue:

Acknowledge that the task has been completed.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

Candidate informs evaluator JPM is complete.

Stop Time:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 11 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Historical Record:

Procedure and Template updates for 2016 ILT NRC Exam.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 12 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Simulator Setup (as required):

1. This JPM can be run from the following Standard (Specific) IC sets:
  • Mode 1 IC SIMULATOR INPUT

SUMMARY

Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 13 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the cover page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators

9.

Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 14 of 15 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 2 JPM Number: JPM-B.05.12-001 JPM

Title:

Perform the Area Radiation Monitor Functional Test Examinee & ID:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 15 of 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

Plant is operating at 100% power.

Maintenance was performed on ARM Channel A1 and it requires PMT.

INITIATING CUES (IF APPLICABLE):

The CRS has directed you to perform Test 1025-A (Area Radiation Monitor Functional), Steps 1, 2, 4 and 6 for ONLY Channel A1.

The Evaluator will act as the second operator

QF1075-01 Rev. 5 (FP-T-SAT-75)

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

MANUALLY INITIATE SBGT A TRAIN JPM NUMBER:

JPM-B.04.02-003 REV.

10 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

CR261.102 SBGT A(B) Train Quarterly Test K/A NUMBERS:

261000 A4.07 Rating: SRO/RO:

3.2/3.1 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

Time for Completion:

15 Minutes Time Critical:

No Alternate Path:

No TASK APPLICABILITY:

SRO:

RO:

NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 2 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 3 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

INITIAL CONDITIONS:

The Reactor is at power SBGT needs to be manually started to support Test 0213 (Drywell To Suppression Chamber Vacuum Breaker Leakage Operational Check)

You are the Balance of Plant operator INITIATING CUES:

The CRS directs you to perform STEPs 1-4 of the B.04.02-05.D.3 to manually initiate SBGT A Train.

Simulator Setup Instructions:

No other simulator setup is needed; perform from any at-power IC

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 4 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM PERFORMANCE INFORMATION Required Materials:

None General

References:

B.04.02-05 Task Standards:

Manually Initiate SBGT A Train Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Critical: N Locate procedure B.04.02-05, Manually Initiate SBGT A Train Operator obtains and reviews procedure.

Standard:

Obtains appropriate procedure.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Critical: N Operator reviews prerequisites No painting has occurred within Reactor Building for at least 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, Or If painting has occurred within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of SBGT operation, Then notify the SCTMT System Engineer to evaluate the effect on the charcoal filters.

Standard:

Evaluate prerequisite Evaluator Cue:

When asked, state that no painting has occurred in the Reactor Building for at least 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 5 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 3 Critical: Y (Procedure B.04.02-05 D.3, STEP 1)

1. Position the following handswitches:
a. HS-2945, AO-2945, to OPEN
b. HS-2979, AO-2979, to OPEN
c. HS-2955, Filter Heater E-34A-1, to ON
d. HS-2983A, V-EF-17A (SBGT Exh Fan), to ON Standard:

Positions the following handswitches:

HS-2945, AO-2945, to OPEN HS-2979, AO-2979, to OPEN HS-2955, Filter Heater E-34A-1, to ON HS-2983A, V-EF-17A (SBGT Exh Fan), to ON Evaluator Note:

Filter heater does not come on until V-EF-17 is started.

Valves wont reposition until SBGT A is placed in Manual on the next step Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical: Y (Procedure B.04.02-05 D.3, STEP 2)

2. Place HS-2988A, A STBY Gas Train Mode Switch, in Position 1 (MANUAL), and verify blue light ON.

Standard:

Places HS-2988A in Position 1 (MANUAL)

(Non-Critical portion of Standard)

Verifies that blue light is on Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 6 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 5 Critical: N (Procedure B.04.02-05 D.3, STEP 3)

3. VERIFY red light above HS-2955 is ON.

Standard:

Verifies red light above HS-2955 is ON Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical: N (Procedure B.04.02-05 D.3, STEP 4)

4. VERIFY one of the following indicates flow:
a. FIC-2943, SBGT A Loop Flow Control
b. FIC-2942, SBGT B Loop Flow Control Standard:

Verifies flow is indicated on FIC-2943 for SBGT A Loop Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Standard:

Operator informs evaluator that the task is completed.

Evaluator Cue:

Acknowledge Report Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

Stop Time:

Historical Record:

Revised to align with Revision 35 of B.04.02-05 for the 2016 ILT NRC Exam

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 7 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Simulator Setup (as required):

1. This JPM can be run from the following Standard (Specific) IC sets:
  • IC-* (IC-*), (IC Conditions Summary)

SIMULATOR INPUT

SUMMARY

Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 8 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the cover page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators

9.

Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 9 of 10 JPM-B.04.02-003 (Manually Initiate SBGT A Train) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 2 JPM Number: JPM-B.04.02-003 JPM

Title:

Manually Initiate SBGT A Train Examinee & ID:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 10 of 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

The Reactor is at power SBGT needs to be manually started to support Test 0213 (Drywell To Suppression Chamber Vacuum Breaker Leakage Operational Check)

You are the Balance of Plant operator INITIATING CUES:

The CRS directs you to perform STEPs 1-4 of the B.04.02-05.D.3 to manually initiate SBGT A Train.

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

FIRE WATER CROSS-TIE TO LPCI JPM NUMBER:

JPM-C.5-3203-001 REV.

15 RELATED PRA INFORMATION:

PRA-ALT-INJ-LY TASK NUMBERS /

TASK TITLE(S):

CR314.110 / NL314.106 Use Alternate Injection Systems For RPV Makeup K/A NUMBERS:

295031 EA1.08 Rating: SRO/RO:

3.9 / 3.8 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

Time for Completion:

15 Minutes Time Critical:

No Alternate Path:

No TASK APPLICABILITY:

SRO:

RO:

NLO Additional site-specific signatures may be added as desired.

Developed by:

Ronald C. Newberry Developer Date Validated by:

Validator (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Chris Peterson Training Supervisor Date

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 2 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM Number: JPM-C.5-3203-001 JPM

Title:

Fire Water Cross-Tie To LPCI Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 3 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM BRIEFING/TURNOVER Provide briefing/turnover in accordance with applicable program description and/or training procedure.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

An emergency condition exists requiring the use of Alternate Injection Systems for RPV Makeup.

The Diesel Fire Pump is operating supplying the Fire Header.

RHRSW is NOT supplying RHR.

INITIATING CUES:

The CRS directs you to perform the IN-PLANT steps for lining up the Fire Water system for LPCI Injection using PART D of C.5-3203.

ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.

EVALUATOR NOTE: Some steps in this procedure require the use of a ladder. To prevent the inadvertent bumping of plant equipment, use of the ladder MUST BE SIMULATED.

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 4 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM PERFORMANCE INFORMATION Required Materials:

Copy of Procedure C.5-3203, PART D General

References:

C.5-3203 (Use of Alternate Injection Systems for RPV Makeup), Rev. 16 Task Standards:

Fire Water has been lined up to LPCI injection in accordance with Procedure C.5-3203, Section D.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Critical: N Review controlled copy of Procedure C.5-3203, Section D (Fire Water Cross-Tie to LPCI).

Standard:

Reviews correct procedure and section.

Evaluator Cue:

Provide operator with copy of procedure C.5-3203, PART D.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Critical: N Procedure STEP 1.

CLOSE RHRSW-13, EMER INJECTION LEAKAGE TELL TALE.

Standard:

Proceeds to the 931 level of the Turbine Building.

Rotates handwheel for RHRSW-13 CW until valve is fully CLOSED.

Evaluator Cue:

INFORM operator that RHRSW-13 moves in clockwise direction, stem lowers, meets resistance and is tight.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 5 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 3 Critical: N Procedure STEP 2.

Verify CLOSED the following valves:

RHRSW-12, EMERGENCY INJECTION VIA A RHRSW LOOP.

RHRSW-68, RHRSW EMERGENCY FLEX INJECTION ISOLATION VALVE.

Standard:

Attempts to rotate handwheel for RHRSW-12 CW.

Attempts to rotate handwheel for RHRSW-68 CW.

Evaluator Note:

A stepladder designated for this procedure is located by door 40. When operator goes to obtain the ladder, indicate that the ladder is in position.

Evaluator Cue:

When operator attempts to rotate respective handwheel, INFORM him resistance is felt and valve does NOT turn.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical: N Procedure STEP 3.

Verify CLOSED the following valves:

MO-2020, RHR DIV 1 DRYWELL SPRAY - OUTBOARD.

MO-2006, RHR DIV 1 DISCHARGE TO TORUS - OUTBOARD.

MO-2021, RHR DIV 2 DRYWELL SPRAY - OUTBOARD.

MO-2007, RHR DIV 2 DISCHARGE TO TORUS - OUTBOARD.

Standard:

Contacts Control Room to verify status of the listed valves.

Evaluator Cue:

As Control Room Operator, REPORT MO-2020, MO-2006, MO-2021 and MO-2007 indicate CLOSED.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 6 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 5 Critical: Y Procedure STEP 4.

OPEN the following valves:

RHRSW-46, EMERGENCY INJECTION VIA DIESEL FIRE PUMP RHRSW-14, EMERGENCY INJECTION VIA A RHRSW LOOP Standard:

Rotates handwheel for RHRSW-46 CCW until valve is OPEN.

Rotates handwheel for RHRSW-14 CCW until valve is OPEN.

Evaluator Note:

A stepladder designated for this procedure is located by door 40. When operator goes to obtain the ladder, indicate that the ladder is in position.

Evaluator Cue:

INFORM operator that the respective valve moves in the counter clockwise direction, stem rises, meets resistance and is tight.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical: N Procedure STEP 5.

If injecting through RHR-A Standard:

Informs Control Room that Firewater is lined up to LPCI.

Evaluator Cue:

When operator proceeds to Procedure Step 5, INFORM him that the Control Room will complete the procedure.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Standard:

Operator informs evaluator that the task is completed.

Evaluator Cue:

Acknowledge that the task has been completed.

Evaluator Note:

DO NOT PROMPT Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 7 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Terminating Cues: Firewater is cross-tied to RHRSW.

Stop Time:

Historical Record: Revision 15 Updated to latest standards, JPM template and procedural revisions.

Changed Performance Step 2 to NON-CRITICAL since leaving the tell-tale drain open would NOT prevent injecting Fire Water using LPCI.

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 8 of 9 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

TURNOVER SHEET INITIAL CONDITIONS:

An emergency condition exists requiring the use of Alternate Injection Systems for RPV Makeup.

The Diesel Fire Pump is operating supplying the Fire Header.

RHRSW is NOT supplying RHR.

INITIATING CUES:

The CRS directs you to perform the IN-PLANT steps for lining up the Fire Water system for LPCI Injection using PART D of C.5-3203.

ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 9 of 9 JPM-C.5-3203-001 (Fire Water Cross-Tie To LPCI) Rev. 15 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the cover page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators

9.

Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

PREPARE THE CRD SYSTEM FOR ALTERNATE BORON INJECTION JPM NUMBER:

JPM-C.5-3102-001 REV.

0 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

NL314.102 Perform actions associated with Alternate Boron Injection with CRD K/A NUMBERS:

295037 EA1.10 Rating: SRO/RO:

3.7/3.9 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

Time for Completion:

20 Minutes Time Critical:

No Alternate Path:

No TASK APPLICABILITY:

SRO:

RO:

NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 2 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev.0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The plant is in a condition where boron injection is required and the SBLC system is not available.

The SBLC tank is at 1500 gallons. It is filled with enriched boron solution that met the concentration requirements of Technical Specification 3.4.B. the last time it was checked.

No. 11 CRD pump is in service and No. 12 CRD pump is not running.

You are an extra operator on shift INITIATING CUES (IF APPLICABLE):

The CRS directs you to prepare the CRD System for alternate boron injection using 11 CRD pump with procedure C.5-3102 (ALTERNATE BORON INJECTION WITH CRD) Steps 1 through 2.g.

Another operator will complete the procedure INFORM THE EVALUATOR WHEN THE TASK IS COMPLETE.

ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 3 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM PERFORMANCE INFORMATION Required Materials:

C.5-3102, Part A General

References:

C.5-3102 Task Standards:

Prepare the CRD System for Alternate Boron Injection Using No. 11 CRD Pump Start Time:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 4 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Critical N Locates procedure C.5-3102 (Alternate Boron Injection With CRD).

Standard:

Locates Appropriate Procedure Evaluator Cue:

Provide the Operator with a copy of the procedure (C.5-3102).

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Critical: N (Procedure STEP 1)

If the SBLC tank level is less than 1000 Gallons, Then fill it using PART B, And perform steps 2.a. through 2.l. of PART A concurrently.

Standard:

Operator should not perform PART B. (1500 gal given in initial conditions)

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical: N (Procedure STEP 2a)

Prepare the CRD system for alternate injection by performing the following:

If a CRD pump is required, Then verify 11 CRD pump is operating.

Standard:

Verifies 11 CRD pump operating (given in initial conditions)

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 5 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 4 Critical: N (Procedure STEP 2b)

If 12 CRD pump is operating, Then STOP 12 CRD pump.

Standard:

Recognizes step is not applicable and N/As step Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Critical: Y (Procedure STEP 2c)

Verify CLOSED the following valves:

CRD-2-2, 12 CRD PUMP SUCT CRD-3-2, 12 CRD PUMP DISCHARGE THROTTLE CST-147, CST CUNO FILTER OUT TO 12 CRD PUMP CRD-45, CRD PUMPS SEAL WTR XTIE CRD-7-2, 12 CRD PUMP RECIRC TO CST CRD-7-1, 11 CRD PUMP RECIRC TO CST CRD-168, CRD PUMP BYPASS ISOL Standard:

1. Closes CRD-2-2 by turning handwheel full travel clockwise, And
2. Closes CRD-3-2 by turning handwheel full travel clockwise, And
3. Closes CRD-45 by turning handwheel full travel clockwise, And
4. Closes CRD-7-2 by turning handwheel full travel clockwise, And
5. Closes CRD-7-1 by turning handwheel full travel clockwise And
6. Closes CRD-168 by turning handwheel full travel clockwise.

(Non-Critical portion of Standard)

Verifies CST-147 closed by noting valve stem full in and attempting to turn handwheel in the clockwise direction.

Evaluator Cue:

1. For CRD-2-2, CRD-3-2, CRD-45 and CRD-168 that are open and need to be closed; the valve stems move IN, meet resistance and are tight.
2. For CST-147; the valve is tight.
3. For CRD-7-1 and CRD-7-2;, the valve stems move IN, meet resistance and are tight.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 6 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 6 Critical: Y (Procedure STEP 2d)

OPEN CRD-46-2, 12 CRD PUMP OTBD VENT Standard:

Opens CRD-46-2 Evaluator Cue:

Valve turns CCW and then meets resistance Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical: Y (Procedure STEP 2e)

Remove the pipe cap on the 1 in. vertical line (in CRD Pump Room between CRD-2-2 and the Y-strainer 3-15B).

Standard:

Using a wrench, removes pipe cap from 1 in. line by turning CCW.

Evaluator Note:

Pipe wrench is located on CRD PUMP HOSE CART at top of stairway entrance to the CRD Pump room.

Evaluator Cue:

Pipe cap turns CCW, the pipe cap is removed.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Critical: Y (Procedure STEP 2f)

CLOSE CRD-46-2 Standard:

Closes CRD-46-2 Evaluator Cue:

Valve turns CW and then meets resistance Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 7 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 9 Critical: Y (Procedure STEP 2g)

Connect the union end of the hose from the CRD PUMP HOSE CART (top of stairway entrance to CRD Pump Room) to the 1 In vertical line (in CRD Pump Room between CRD-2-2 and the Y-strainer 3-15B).

1. Install TEE # 1 - CRD SUCTION LINE VENT with vent valve to 1 inch vertical line. (Tee stored on CRD PUMP HOSE CART) at stairway entrance to CRD pump room.)
2. Connect hose union tee.
3. Verify 1 inch vertical line vent valve is CLOSED.

Standard:

Installs tee and connects union end of hose to the 1 In. vertical line by threading on and tightening with wrench in the CW direction.

Evaluator Cue:

Union end of hose threads onto 1 In. vertical line, turns CW and is tight.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 28 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Standard:

Informs evaluator that the task is completed.

Evaluator Note:

DO NOT PROMPT Evaluator Cue:

Acknowledge task is complete Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When report is made that the task is complete, state the JPM is complete Stop Time:

Historical Record: New Create for the 2016 ILT NRC Exam

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 8 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Simulator Setup (as required):

1. This JPM can be run from the following Standard (Specific) IC sets:
  • IC-* (IC-*), (IC Conditions Summary)

SIMULATOR INPUT

SUMMARY

Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 9 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the cover page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators

9.

Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 10 of 11 JPM-C.5-3102-001 (Prepare the CRD System for Alternate Boron Injection) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 2 JPM Number: JPM-C.5-3102-002 JPM

Title:

Prepare the CRD System for Alternate Boron Injection Examinee & ID:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF1075-01 Rev. 5 (FP-T-SAT-75)

Page 11 of 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

The plant is in a condition where boron injection is required and the SBLC system is not available.

The SBLC tank is at 1500 gallons. It is filled with enriched boron solution that met the concentration requirements of Technical Specification 3.4.B. the last time it was checked.

No. 11 CRD pump is in service and No. 12 CRD pump is not running.

You are an extra operator on shift INITIATING CUES (IF APPLICABLE):

The CRS directs you to prepare the CRD System for alternate boron injection using 11 CRD pump with procedure C.5-3102 (ALTERNATE BORON INJECTION WITH CRD) Steps 1 through 2.g.

Another operator will complete the procedure INFORM THE EVALUATOR WHEN THE TASK IS COMPLETE.

ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 1 of 12 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

MANUAL CONTROL OF RHRSW CV-1729 JPM NUMBER:

JPM-B.08.01.03-001 REV.

10 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

NL205.118 Take Manual Control of the RHRSW Control Valves, CV-1728 and CV-1729 upon Failure of SV-1728 or SV-1729 K/A NUMBERS:

205000 A2.08 Rating: SRO/RO:

3.3/3.5 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

Time for Completion:

20 Minutes Time Critical:

No Alternate Path:

No TASK APPLICABILITY:

SRO:

RO:

NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 2 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM Number: JPM-B.08.01.03-001 JPM

Title:

Manual Control of RHRSW CV-1729 Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 3 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The Reactor is shutdown and <212F. The No. 12 RHR Heat Exchanger Control valve CV-1729 solenoid valve SV-1729 has failed. The No. 11 and No. 13 RHR pump breakers have been previously removed for breaker maintenance. Shutdown cooling is desired at this time.

INITIATING CUES:

The Control Room Supervisor directs you to assume manual control of RHR Heat Exchanger RHRSW control valve CV-1729 in accordance with B.08.01.03-05.H.3.

ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 4 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

JPM PERFORMANCE INFORMATION Required Materials:

Copy of Procedure B.08.01.03-05, Section H.3 (Taking Manual Control of RHRSW Control Valves CV-1728 and CV-1729 Upon Failure of SV-1728 or SV-1729)

Copy of B.08.01.03-06 Figure 2 (RHRSW Control Valve General

References:

B.08.01.03-05 (RHR Service Water System-System Operation)

Task Standards:

Manual control of CV-1729 is established and valve position is set correctly for plant conditions Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Critical: N Locate Procedure B.08.01.03-05.H.3, "Taking Manual Control of RHRSW Control Valves, CV-1728 and CV-1729 Upon Failure of SV-1728 or SV-1729."

Standard:

Locates and reviews the appropriate procedure.

Determines Part B is the appropriate procedure for the task Evaluator Cue:

When operator locates (or provides a verbal description of the location) controlled copy of procedure and section, PROVIDE operator copy of section H.2 of procedure B.08.01.03-05.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 5 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 2 Critical: Y (Procedure PART B, STEP 11)

Obtain key to unlock handwheel on CV-1729, 12 RHRSW Outlet.

Standard:

Obtains key No. 41 from operator key ring or the W.E.C.

Evaluator Cue:

If operator requests key from the W.E.C, INFORM operator that they have the key.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical: N (Procedure STEP 12)

Establish communications between B RHR Room and Control Room Standard:

Establishes radio communication between the Control Room and himself from the B RHR room.

Evaluator Cue:

When operator describes where to find a radio, INFORM them that radio communication is established between Control Room and B RHR room.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical: Y (Procedure STEP 13)

NOTE: Completion of following step will result in CV-1729's brass handwheel screw holding valve closed via engagement with valve stem.

Unlock the handwheel on CV-1729 (see Ops Man Section B.08.01.03-06, Figure 2 - RHRSW Control Valve),

And turn it clockwise until resistance is felt.

Standard:

Unlocks the valve handwheel for CV-1729.

Rotates the valve handwheel for CV-1729 clockwise until resistance is felt.

Evaluator Cue:

Handwheel is unlocked.

CV-1729 handwheel rotates clockwise and resistance is felt.

Evaluator Note:

Operator does not have to examine figure in Ops Manual if they are familiar with the equipment.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 6 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 5 Critical: Y (Procedure STEP 14)

CAUTION Do not dead head pumps for more than 7 minutes.

Turn the air supply valve to the "MANUAL" position. (See Ops Man Section B.08.01.03-06, Figure 2 - RHRSW Control Valve for location of the air supply valve).

Standard:

Turns the air supply valve to the MANUAL position.

Evaluator Cue:

Air supply valve is in the MANUAL position.

Evaluator Note:

Operator does not have to examine Ops Manual figure if they are familiar with the equipment.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical: N (Procedure STEP 15)

Notify Control Room of the following:

a) Control valve CV-1729 is ready for manual operation, b) RHRSW pump may be started.

Standard:

Notifies the Control Room CV-1729 is ready for manual operation, And Notifies the Control Room, the RHRSW pump is ready to be started.

Evaluator Cue:

As the Control Room, acknowledge the report that CV-1729 is ready for manual operation and the RHRSW pump may be started.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 7 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 7 Critical: N (Procedure STEP 16)

START an RHRSW pump per Ops Man B.08.01.03-05.D.1, Startup Procedure - Startup of RHRSW Pumps.

Standard:

None Evaluator Cue:

As the Control Room, INFORM the operator that Control Room Operators have started the No. 12 RHRSW pump.

Evaluator Note:

It is not the intent of this JPM for the operator to perform action in the Intake for starting of a RHRSW pump Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Critical: Y (Procedure STEP 17)

Open CV-1729 to obtain the desired flow rate by turning the valve handwheel in the counterclockwise direction.

No. of Approximate Pumps Flowrate Valve Position 1

3500 gpm 55% open 2

7000 gpm 85% open Standard:

Opens CV-1729 by turning the valve handwheel CCW until valve position is at 55%.

Evaluator Cue:

Valve position indicates approximately 55%. Flow rate is 3500 GPM.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 8 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 9 Critical: N (Procedure STEP 18)

Verify that RHR HX tube-to-shell side dP is greater than 20 psid by checking DPIS-10-92B (local instrument rack), AND adjust valve position, as required.

Standard:

Verifies DP is greater than 20 psid by checking dPIS-10-92B.

Evaluator Cue:

When operator checks dPIS-10-92B, INFORM the operator that the dPIS indicates 40 psid.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Critical: Y (Procedure STEP 19)

Lock handwheel for CV-1729 in position.

Standard:

Locks the handwheel in position.

Evaluator Cue:

Handwheel is locked in position.

Evaluator Note:

The valve position may drift unless the handwheel is locked.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 Critical: N (Procedure STEP 20)

NOTE: Valve CV-1729 is now locked in position at desired flow rate. An operator does not need to be stationed at valve continuously.

Monitor system flowrate from Control Room.

Standard:

None Evaluator Cue:

Flowrate is being monitored from the Control Room.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 9 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Performance Step: 12 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Standard:

Operator informs evaluator that the task is completed.

Evaluator Cue:

ACKNOWLEDGE that the task has been completed.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

Stop Time:

Historical Record:

Revision 11 updated JPM to newest revision of QF-1075-01

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 10 of 12 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

TURNOVER SHEET INITIAL CONDITIONS:

The Reactor is shutdown and <212F. The No. 12 RHR Heat Exchanger Control valve CV-1729 solenoid valve SV-1729 has failed. The No. 11 and No. 13 RHR pump breakers have been previously removed for breaker maintenance. Shutdown cooling is desired at this time.

INITIATING CUES:

The Control Room Supervisor directs you to assume manual control of RHR Heat Exchanger RHRSW control valve CV-1729 in accordance with B.08.01.03-05.H.3.

ALL OPERATOR ACTIONS ARE TO BE SIMULATED UNLESS OTHERWISE DIRECTED.

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 11 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Simulator Setup (as required):

1. This JPM can be run from the following Standard (Specific) IC sets:
  • IC-* (IC-*), (IC Conditions Summary)

SIMULATOR INPUT

SUMMARY

Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger

QF-1075-01 Rev. 4 (FP-T-SAT-75)

Page 12 of 12 JPM-B.08.01.03-001 (Manual Control Of RHRSW CV-1729) Rev. 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the cover page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators

9.

Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date