| issue date = 08/28/2018
| issue date = 08/28/2018
| title = Updated Inspection Plan (Inspection Report 05000443/2018005)
| title = Updated Inspection Plan (Inspection Report 05000443/2018005)
| author name = Bower F L
| author name = Bower F
| author affiliation = NRC/RGN-I/DRP/PB3
| author affiliation = NRC/RGN-I/DRP/PB3
| addressee name = Nazar M
| addressee name = Nazar M
Line 21: Line 21:


==SUBJECT:==
==SUBJECT:==
SEABROOK STATION, UNIT NO. 1 UPDATED INSPECTION PLAN (INSPECTION REPORT 05000 443/20 18005)
SEABROOK STATION, UNIT NO. 1 UPDATED INSPECTION PLAN (INSPECTION REPORT 05000443/2018005)


==Dear Mr. Nazar:==
==Dear Mr. Nazar:==
The enclosed inspection plan lists the inspections scheduled through June 30 , 20 20 , for Seabrook Station, Unit 1 (Seabrook). The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. In addition to baseline inspections, the NRC will also be performing Inspection Procedure (IP) 81311 , "Physical Security Requirements for Independent Spent Fuel Storage Installations." Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for Seabrook Station, Unit 1 (Seabrook). The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. In addition to baseline inspections, the NRC will also be performing Inspection Procedure (IP) 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.


As previously noted in the February 28, 201 8, annual assessment letter (Reports 05000443/2017006, 05000443/2017402, and 05000443/2017501; ADAMS Accession No. ML18053A751) regarding the Alkali
As previously noted in the February 28, 2018, annual assessment letter (Reports 05000443/2017006, 05000443/2017402, and 05000443/2017501; ADAMS Accession No. ML18053A751) regarding the Alkali-Silica Reaction (ASR) concrete issues, the NRC will continue to provide focused oversight of NextEras assessment of ASR progression in Seabrooks concrete structures using baseline inspection Problem Identification and Resolution (PI&R) annual samples. While tentative dates for these ongoing inspections are included in the attached inspection schedule, we understand that your schedule is subject to change. We will coordinate closely with your ASR project management staff to select the most appropriate opportunities to inspect your activities.
-Silica Reaction (ASR) concrete issues, the NRC will continue to provide focused oversight of NextEra's assessment of ASR progression in Seabrook's concrete structures using baseline inspection Problem Identification and Resolution (PI&R) annual samples. While tentative dates for these ongoing inspections are included in the attached inspection schedule, we understand that your schedule is subject to change. We will coordinate closely with your ASR project management staff to select the most appropriate opportunities to inspect your activities.


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5200 with any questions you have regarding this letter.
's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5200 with any questions you have regarding this letter.


Sincerely,
Sincerely,
/RA/ Fred L. Bower, III, Chief Project Branch 3 Division of Reactor Projects Docket No. 50
/RA/  
-443 License No. NPF-86 Enclosure:
Seabrook Inspection Plan cc: Distribution via ListServ SUBJECT: SEABROOK STATION, UNIT NO. 1 UPDATED INSPECTION PLAN (INSPECTION REPORT 05000443/2018005)
DATED AUGUST 28, 2018 DISTRIBUTION w/encl:
(via e-mail) DLew, RA (R1ORAMAIL Res)
JGiessner, DRA (R1ORAMAIL Res)
RLorson, DRP (R1DRPMAIL Res)
DPelton, DRP (R1DRPMAIL Res
) JYerokun, DRS (R1DRSMAIL Res BWelling, DRS (R1DRSMAIL RES)
FBower, DRP CLally, DRP MDraxton, DRP SGhrayeb, DRP PCataldo, DRP, SRI PMeier, DRP, RI ACass, DRP, Resident AA JBowen, RI, OEDO RidsNrrPMSeabrook Resource RidsNrrDorlLpl1 Resource ROPreports Resource DRS Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource DOCUMENT NAME:
G:\DRP\BRANCH3\Assessment
\ROP 19\Mid-Cycl e\Letters\Seabrook\ROP 19 Inspection Plan Letter SB_FINAL.docx ADAMS ACCESSION NUMBER:
ML18228A565 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRS RI/DRP NAME CLally/CML via email PMeier/PAM via email MGray FBower DATE 8/15/18 8/15/18 8/16/18 8/28/18 OFFICIAL RECORD CO PY Seabrook 07/01/2018 - 06/30/2020


Unit Start End Activity CAC Title Staff Count
Fred L. Bower, III, Chief Project Branch 3 Division of Reactor Projects


MC&A
Docket No. 50-443 License No. NPF-86


1 07/16/2018
Enclosure:
Seabrook Inspection Plan


07/20/2018
cc: Distribution via ListServ


IP 71130.11
ML18228A565


000742 Material Control and Accounting (MC&A)
SUNSI Review


PI&R BIENNIAL
Non-Sensitive Sensitive


1 07/23/2018
Publicly Available Non-Publicly Available


07/27/2018
OFFICE RI/DRP RI/DRP RI/DRS RI/DRP


IP 71152B 000747 Problem Identification and Resolution
NAME CLally/CML via email PMeier/PAM via email MGray FBower


08/06/2018
DATE 8/15/18 8/15/18 8/16/18 8/28/18


08/10/2018
Seabrook 07/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count MC&A


IP 71152B 000747 Problem Identification and Resolution
1 07/16/2018 07/20/2018 IP 71130.11 000742 Material Control and Accounting (MC&A)
 
PI&R BIENNIAL
RADWASTE
 
1 08/20/2018
 
08/24/2018
 
IP 71124.08
 
000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and
 
Transportation
 
Annual PIR Sample - ASR
 
1 09/10/2018
 
09/28/2018
 
IP 71111.15
 
000708 Operability Determinations and Functionality Assessments
 
09/10/2018
 
09/14/2018
 
IP 71152 000748 Problem Identification and Resolution
 
UNIT 1 INSERVICE INSPECTION
 
1 10/08/2018
 
10/19/2018
 
IP 71111.08P
 
000702 Inservice Inspection Activities - PWR
 
HP


1 10/15/2018
1 07/23/2018 07/27/2018 IP 71152B 000747 Problem Identification and Resolution


10/19/2018
08/06/2018 08/10/2018 IP 71152B 000747 Problem Identification and Resolution RADWASTE


IP 71124.01
1 08/20/2018 08/24/2018 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Annual PIR Sample - ASR


000725 Radiological Hazard Assessment and Exposure Controls
1 09/10/2018 09/28/2018 IP 71111.15 000708 Operability Determinations and Functionality Assessments


10/15/2018
09/10/2018 09/14/2018 IP 71152 000748 Problem Identification and Resolution UNIT 1 INSERVICE INSPECTION


10/19/2018
1 10/08/2018 10/19/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR HP


IP 71124.02
1 10/15/2018 10/19/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls


000726 Occupational ALARA Planning and Controls
10/15/2018 10/19/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls


10/15/2018
10/15/2018 10/19/2018 IP 71151 000746 Performance Indicator Verification RETS


10/19/2018
1 01/28/2019 02/01/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Annual Sample - ASR


IP 71151 000746 Performance Indicator Verification
1 02/04/2019 02/08/2019 IP 71152 001339 Problem Identification and Resolution EP PROGRAM INSPECTION


RETS
1 04/08/2019 04/12/2019 IP 71114.02 000717 Alert and Notification System Testing


1 01/28/2019
04/08/2019 04/12/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System


02/01/2019
04/08/2019 04/12/2019 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies


IP 71124.06
04/08/2019 04/12/2019 IP 71151 001397 Performance Indicator Verification DESIGN BASES ASSURANCE INSP - TEAMS


000730 Radioactive Gaseous and Liquid Effluent Treatment
1 04/15/2019 04/19/2019 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
 
8/14/2018 12:18:18 PM Page 1 of 3 This report does not include INPO and OUTAGE activities.
Annual Sample - ASR
 
1 02/04/2019
 
02/08/2019
 
IP 71152 001339 Problem Identification and Resolution
 
EP PROGRAM INSPECTION
 
1 04/08/2019
 
04/12/2019
 
IP 71114.02
 
000717 Alert and Notification System Testing
 
04/08/2019
 
04/12/2019
 
IP 71114.03
 
000718 Emergency Response Organization Staffing and Augmentation System
 
04/08/2019
 
04/12/2019
 
IP 71114.05
 
000720 Correction of Emergency Preparedness Weaknesses and Deficiencies
 
04/08/2019
 
04/12/2019
 
IP 71151 001397 Performance Indicator Verification
 
DESIGN BASES ASSURANCE INSP - TEAMS
 
1 04/15/2019
 
04/19/2019
 
IP 71111.21M
 
000713 Design Bases Assurance Inspection (Teams)
 
8/14/2018 12:18:18 PM
 
Page  
 
of  
 
This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Line 208: Line 98:
IP 22 Inspection Activity Plan Report
IP 22 Inspection Activity Plan Report


Seabrook 07/01/2018 - 06/30/2020
Seabrook 07/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count DESIGN BASES ASSURANCE INSP - TEAMS
 
Unit Start End Activity CAC Title Staff Count
 
DESIGN BASES ASSURANCE INSP - TEAMS
 
1 04/29/2019
 
05/03/2019
 
IP 71111.21M
 
000713 Design Bases Assurance Inspection (Teams)


1 04/29/2019 05/03/2019 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
ACCESS CONTROL, PROTECTIVE STRATEGY, TSR
ACCESS CONTROL, PROTECTIVE STRATEGY, TSR


1 04/22/2019
1 04/22/2019 04/26/2019 IP 71130.02 000734 Access Control
 
04/26/2019
 
IP 71130.02
 
000734 Access Control
 
04/22/2019
 
04/26/2019
 
IP 71130.05
 
000737 Protective Strategy Evaluation
 
04/22/2019
 
04/26/2019
 
IP 71130.14
 
000743 Review of Power Reactor Target Sets
 
04/22/2019
 
04/26/2019
 
IP 71151 001338 Performance Indicator Verification
 
HP
 
1 05/13/2019
 
05/17/2019
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
05/13/2019
 
05/17/2019
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
05/13/2019
 
05/17/2019
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
05/13/2019
 
05/17/2019
 
IP 71124.04
 
000729 Occupational Dose Assessment
 
05/13/2019
 
05/17/2019
 
IP 71124.05
 
000729 Radiation Monitoring Instrumentation
 
REMP
 
1 07/15/2019
 
07/19/2019
 
IP 71124.07
 
000731 Radiological Environmental Monitoring Program
 
CYBER FULL IMP
 
1 07/15/2019
 
07/19/2019
 
IP 71130.10P
 
000741 Cyber Security
 
07/29/2019
 
08/02/2019
 
IP 71130.10P
 
000741 Cyber Security
 
Annual Sample - ASR
 
1 08/05/2019
 
08/09/2019
 
IP 71152 000748 Problem Identification and Resolution
 
HP
 
1 09/09/2019
 
09/13/2019
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls


09/09/2019
04/22/2019 04/26/2019 IP 71130.05 000737 Protective Strategy Evaluation


09/13/2019
04/22/2019 04/26/2019 IP 71130.14 000743 Review of Power Reactor Target Sets


IP 71124.02
04/22/2019 04/26/2019 IP 71151 001338 Performance Indicator Verification HP


000726 Occupational ALARA Planning and Controls
1 05/13/2019 05/17/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls


09/09/2019
05/13/2019 05/17/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls


09/13/2019
05/13/2019 05/17/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation


IP 71124.03
05/13/2019 05/17/2019 IP 71124.04 000729 Occupational Dose Assessment


000727 In-Plant Airborne Radioactivity Control and Mitigation
05/13/2019 05/17/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation REMP


09/09/2019
1 07/15/2019 07/19/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program CYBER FULL IMP


09/13/2019
1 07/15/2019 07/19/2019 IP 71130.10P 000741 Cyber Security


IP 71124.04
07/29/2019 08/02/2019 IP 71130.10P 000741 Cyber Security Annual Sample - ASR


000729 Occupational Dose Assessment
1 08/05/2019 08/09/2019 IP 71152 000748 Problem Identification and Resolution HP


09/09/2019
1 09/09/2019 09/13/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls


09/13/2019
09/09/2019 09/13/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls


IP 71124.05
09/09/2019 09/13/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation


000729 Radiation Monitoring Instrumentation
09/09/2019 09/13/2019 IP 71124.04 000729 Occupational Dose Assessment


HP
09/09/2019 09/13/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation HP


1 11/18/2019
1 11/18/2019 11/22/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls


11/22/2019
11/18/2019 11/22/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 8/14/2018 12:18:18 PM Page 2 of 3 This report does not include INPO and OUTAGE activities.
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
11/18/2019
 
11/22/2019
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
8/14/2018 12:18:18 PM
 
Page  
 
of  
 
This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Line 404: Line 147:
IP 22 Inspection Activity Plan Report
IP 22 Inspection Activity Plan Report


Seabrook 07/01/2018 - 06/30/2020
Seabrook 07/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count HP
 
Unit Start End Activity CAC Title Staff Count
 
HP


1 11/18/2019
1 11/18/2019 11/22/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation


11/22/2019
11/18/2019 11/22/2019 IP 71124.04 000729 Occupational Dose Assessment


IP 71124.03
11/18/2019 11/22/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation


000727 In-Plant Airborne Radioactivity Control and Mitigation
11/18/2019 11/22/2019 IP 71151 000746 Performance Indicator Verification SEABROOK REQUAL INSP W/ P/F RESULTS


11/18/2019
1 12/09/2019 12/13/2019 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)
 
11/22/2019
 
IP 71124.04
 
000729 Occupational Dose Assessment
 
11/18/2019
 
11/22/2019
 
IP 71124.05
 
000729 Radiation Monitoring Instrumentation
 
11/18/2019
 
11/22/2019
 
IP 71151 000746 Performance Indicator Verification
 
SEABROOK REQUAL INSP W/ P/F RESULTS
 
1 12/09/2019
 
12/13/2019
 
IP 71111.11A
 
000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)
 
12/09/2019
 
12/13/2019
 
IP 71111.11B
 
000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)


12/09/2019 12/13/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)
Access Authorization and Control, FFD, SGI Control, and ISFSI
Access Authorization and Control, FFD, SGI Control, and ISFSI


1 01/27/2020
1 01/27/2020 01/31/2020 IP 71130.01 000733 Access Authorization
 
01/31/2020
 
IP 71130.01
 
000733 Access Authorization
 
01/27/2020
 
01/31/2020
 
IP 71130.02
 
000734 Access Control
 
01/27/2020
 
01/31/2020
 
IP 71130.06
 
000738 Protection of Safeguards Information
 
01/27/2020
 
01/31/2020
 
IP 71130.08
 
000740 Fitness For Duty Program
 
01/27/2020
 
01/31/2020
 
IP 71151 001338 Performance Indicator Verification
 
01/27/2020
 
01/31/2020
 
IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations
 
Radwaste
 
1 02/03/2020
 
02/07/2020
 
IP 71124.08
 
000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and
 
Transportation
 
ISI - UNIT 1
 
1 04/06/2020
 
04/17/2020
 
IP 71111.08P
 
000702 Inservice Inspection Activities - PWR
 
HP
 
1 05/11/2020
 
05/15/2020
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
05/11/2020
 
05/15/2020
 
IP 71124.02


000726 Occupational ALARA Planning and Controls
01/27/2020 01/31/2020 IP 71130.02 000734 Access Control


FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS
01/27/2020 01/31/2020 IP 71130.06 000738 Protection of Safeguards Information


1 06/15/2020
01/27/2020 01/31/2020 IP 71130.08 000740 Fitness For Duty Program


06/19/2020
01/27/2020 01/31/2020 IP 71151 001338 Performance Indicator Verification


IP 71130.03
01/27/2020 01/31/2020 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations Radwaste


000735 Contingency Response - Force-On-Force Testing
1 02/03/2020 02/07/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation ISI - UNIT 1


8/14/2018 12:18:18 PM
1 04/06/2020 04/17/2020 IP 71111.08P 000702 Inservice Inspection Activities - PWR HP


Page
1 05/11/2020 05/15/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls


of
05/11/2020 05/15/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS


This report does not include INPO and OUTAGE activities.
1 06/15/2020 06/19/2020 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 8/14/2018 12:18:18 PM Page 3 of 3 This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.

Latest revision as of 14:29, 5 January 2025

Updated Inspection Plan (Inspection Report 05000443/2018005)
ML18228A567
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 08/28/2018
From: Fred Bower
Reactor Projects Branch 3
To: Nazar M
NextEra Energy Seabrook
References
IR 2018005
Download: ML18228A567 (5)


Text

August 28, 2018

SUBJECT:

SEABROOK STATION, UNIT NO. 1 UPDATED INSPECTION PLAN (INSPECTION REPORT 05000443/2018005)

Dear Mr. Nazar:

The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for Seabrook Station, Unit 1 (Seabrook). The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. In addition to baseline inspections, the NRC will also be performing Inspection Procedure (IP) 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

As previously noted in the February 28, 2018, annual assessment letter (Reports 05000443/2017006, 05000443/2017402, and 05000443/2017501; ADAMS Accession No. ML18053A751) regarding the Alkali-Silica Reaction (ASR) concrete issues, the NRC will continue to provide focused oversight of NextEras assessment of ASR progression in Seabrooks concrete structures using baseline inspection Problem Identification and Resolution (PI&R) annual samples. While tentative dates for these ongoing inspections are included in the attached inspection schedule, we understand that your schedule is subject to change. We will coordinate closely with your ASR project management staff to select the most appropriate opportunities to inspect your activities.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5200 with any questions you have regarding this letter.

Sincerely,

/RA/

Fred L. Bower, III, Chief Project Branch 3 Division of Reactor Projects

Docket No. 50-443 License No. NPF-86

Enclosure:

Seabrook Inspection Plan

cc: Distribution via ListServ

ML18228A565

SUNSI Review

Non-Sensitive Sensitive

Publicly Available Non-Publicly Available

OFFICE RI/DRP RI/DRP RI/DRS RI/DRP

NAME CLally/CML via email PMeier/PAM via email MGray FBower

DATE 8/15/18 8/15/18 8/16/18 8/28/18

Seabrook 07/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count MC&A

1 07/16/2018 07/20/2018 IP 71130.11 000742 Material Control and Accounting (MC&A)

PI&R BIENNIAL

1 07/23/2018 07/27/2018 IP 71152B 000747 Problem Identification and Resolution

08/06/2018 08/10/2018 IP 71152B 000747 Problem Identification and Resolution RADWASTE

1 08/20/2018 08/24/2018 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Annual PIR Sample - ASR

1 09/10/2018 09/28/2018 IP 71111.15 000708 Operability Determinations and Functionality Assessments

09/10/2018 09/14/2018 IP 71152 000748 Problem Identification and Resolution UNIT 1 INSERVICE INSPECTION

1 10/08/2018 10/19/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR HP

1 10/15/2018 10/19/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

10/15/2018 10/19/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls

10/15/2018 10/19/2018 IP 71151 000746 Performance Indicator Verification RETS

1 01/28/2019 02/01/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Annual Sample - ASR

1 02/04/2019 02/08/2019 IP 71152 001339 Problem Identification and Resolution EP PROGRAM INSPECTION

1 04/08/2019 04/12/2019 IP 71114.02 000717 Alert and Notification System Testing

04/08/2019 04/12/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

04/08/2019 04/12/2019 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies

04/08/2019 04/12/2019 IP 71151 001397 Performance Indicator Verification DESIGN BASES ASSURANCE INSP - TEAMS

1 04/15/2019 04/19/2019 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

8/14/2018 12:18:18 PM Page 1 of 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Seabrook 07/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count DESIGN BASES ASSURANCE INSP - TEAMS

1 04/29/2019 05/03/2019 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

ACCESS CONTROL, PROTECTIVE STRATEGY, TSR

1 04/22/2019 04/26/2019 IP 71130.02 000734 Access Control

04/22/2019 04/26/2019 IP 71130.05 000737 Protective Strategy Evaluation

04/22/2019 04/26/2019 IP 71130.14 000743 Review of Power Reactor Target Sets

04/22/2019 04/26/2019 IP 71151 001338 Performance Indicator Verification HP

1 05/13/2019 05/17/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

05/13/2019 05/17/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls

05/13/2019 05/17/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

05/13/2019 05/17/2019 IP 71124.04 000729 Occupational Dose Assessment

05/13/2019 05/17/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation REMP

1 07/15/2019 07/19/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program CYBER FULL IMP

1 07/15/2019 07/19/2019 IP 71130.10P 000741 Cyber Security

07/29/2019 08/02/2019 IP 71130.10P 000741 Cyber Security Annual Sample - ASR

1 08/05/2019 08/09/2019 IP 71152 000748 Problem Identification and Resolution HP

1 09/09/2019 09/13/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

09/09/2019 09/13/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls

09/09/2019 09/13/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

09/09/2019 09/13/2019 IP 71124.04 000729 Occupational Dose Assessment

09/09/2019 09/13/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation HP

1 11/18/2019 11/22/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

11/18/2019 11/22/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 8/14/2018 12:18:18 PM Page 2 of 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Seabrook 07/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count HP

1 11/18/2019 11/22/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

11/18/2019 11/22/2019 IP 71124.04 000729 Occupational Dose Assessment

11/18/2019 11/22/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation

11/18/2019 11/22/2019 IP 71151 000746 Performance Indicator Verification SEABROOK REQUAL INSP W/ P/F RESULTS

1 12/09/2019 12/13/2019 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)

12/09/2019 12/13/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

Access Authorization and Control, FFD, SGI Control, and ISFSI

1 01/27/2020 01/31/2020 IP 71130.01 000733 Access Authorization

01/27/2020 01/31/2020 IP 71130.02 000734 Access Control

01/27/2020 01/31/2020 IP 71130.06 000738 Protection of Safeguards Information

01/27/2020 01/31/2020 IP 71130.08 000740 Fitness For Duty Program

01/27/2020 01/31/2020 IP 71151 001338 Performance Indicator Verification

01/27/2020 01/31/2020 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations Radwaste

1 02/03/2020 02/07/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation ISI - UNIT 1

1 04/06/2020 04/17/2020 IP 71111.08P 000702 Inservice Inspection Activities - PWR HP

1 05/11/2020 05/15/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

05/11/2020 05/15/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS

1 06/15/2020 06/19/2020 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 8/14/2018 12:18:18 PM Page 3 of 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report