| issue date = 02/28/2018
| issue date = 02/28/2018
| title = Annual Assessment Letter for Peach Bottom Atomic Power Station Units 2 and 3 -(Report 05000277-2017006 and 05000278-2017006 Report 05000277-2017402 and 05000278-2017402 Report 05000277-2017501 and 05000278-2017501)
| title = Annual Assessment Letter for Peach Bottom Atomic Power Station Units 2 and 3 -(Report 05000277-2017006 and 05000278-2017006 Report 05000277-2017402 and 05000278-2017402 Report 05000277-2017501 and 05000278-2017501)
| author name = Krafty J A
| author name = Krafty J
| author affiliation = NRC/RGN-I/DRP/PB4
| author affiliation = NRC/RGN-I/DRP/PB4
| addressee name = Hanson B C
| addressee name = Hanson B
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000277, 05000278
| docket = 05000277, 05000278
| license number = DPR-044, DPR-056
| license number = DPR-044, DPR-056
| contact person = Krafty J A
| contact person = Krafty J
| document report number = IR 2017006, IR 2017402, IR 2017501
| document report number = IR 2017006, IR 2017402, IR 2017501
| package number = ML18046A367
| package number = ML18046A367
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:[Type here]
{{#Wiki_filter:February 28, 2018
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406
 
-2713 2018 Mr. Bryan Senior Vice President, Exelon Generation, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfiel d Road Warrenville, I L 60555 SUBJEC T: ANNUAL ASSESSMENT LETTER FOR PEAC H BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 - (REPORT 05000 277/ 20170 06 AND 05000278/2017 006 REPORT 05000277/2017402 AND 05000278/2017402 REPORT 05000277/2017501 AND 05000278/2017501)
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 - (REPORT 05000277/
2017006 AND 05000278/2017006 REPORT 05000277/2017402 AND 05000278/2017402 REPORT 05000277/2017501 AND 05000278/2017501)


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==
The NRC has completed its end
The NRC has completed its end-of-cycle performance assessment of Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3, reviewing performance indicators (PIs),
-of-cycle performance assessment of Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017 through December 31, 2017. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
inspection results, and enforcement actions from January 1, 2017 through December 31, 2017.
 
This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
 
The NRC determined the performance at PBAPS Units 2 and 3 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green).


The NRC determined the performance at PBAPS Units 2 and 3 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC's Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.


The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.


Additionally, the NRC plans to conduct Inspection Procedure 60855.1, "Operation of an Independent Spent Fuel Storage Installation at Operating Plant and 71003, Post Approval Site Inspection For License Renewal at Unit 2." In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the
Additionally, the NRC plans to conduct Inspection Procedure 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plant and 71003, Post Approval Site Inspection For License Renewal at Unit 2.


NRC's Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC's Website at http://www.nrc.gov/reading
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 610-337-5120 with any questions you may have regarding this letter.
-rm/adams.html (the Public Electronic Reading Room). Please contact me at 610-337-5120 with any questions you may have regarding this letter.


Sincerely,
Sincerely,
/RA/ James A. Krafty , Acting Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-277 and 50
/RA/  
-278 License Nos.
 
DPR-44 and DPR
-56 Enclosure:
Inspection/Activit y Plan
 
ML18047A006 SUNSI ReviewNon-SensitiveSensitivePublicly AvailableNon-PubliclyAvailableOFFICE RI/DRP RI/DRP NAME SBarber JKrafty DATE 2/28/18 /218 Peach Bottom
 
01/01/2018 - 12/31/2019
 
Unit Start End Activity CAC Title Staff Count


Annual Sample - Structural Monitoring Program
James A. Krafty, Acting Chief Reactor Projects Branch 4 Division of Reactor Projects


2, 3 01/29/2018
Docket Nos. 50-277 and 50-278 License Nos. DPR-44 and DPR-56


02/02/2018
Enclosure:
Inspection/Activity Plan


IP 71152 000748 Problem Identification and Resolution
ML18047A006


RAD MONITORING INSTRU Mod 05
SUNSI Review


2, 3 03/26/2018
Non-Sensitive


03/30/2018
Sensitive


IP 71124.05
Publicly Available


000729 Radiation Monitoring Instrumentation
Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SBarber JKrafty DATE 2/28/18 2/28/18


TRIENNIAL FIRE PROTECTION
Peach Bottom 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count Annual Sample - Structural Monitoring Program


2, 3 04/02/2018
2, 3 01/29/2018 02/02/2018 IP 71152 000748 Problem Identification and Resolution RAD MONITORING INSTRU Mod 05


04/06/2018
2, 3 03/26/2018 03/30/2018 IP 71124.05 000729 Radiation Monitoring Instrumentation TRIENNIAL FIRE PROTECTION
 
IP 71111.05T
 
000696 Fire Protection (Triennial)
 
2, 3 04/16/2018
 
04/20/2018
 
IP 71111.05T
 
000696 Fire Protection (Triennial)


2, 3 04/02/2018 04/06/2018 IP 71111.05T 000696 Fire Protection (Triennial)
2, 3 04/16/2018 04/20/2018 IP 71111.05T 000696 Fire Protection (Triennial)
EP EXERCISE INSPECTION
EP EXERCISE INSPECTION


2, 3 04/16/2018
2, 3 04/16/2018 04/20/2018 IP 71114.01 000716 Exercise Evaluation RAD HAZARD & ALARA Mods 01, 02
 
04/20/2018
 
IP 71114.01
 
000716 Exercise Evaluation
 
RAD HAZARD & ALARA Mods 01, 02
 
2, 3 04/23/2018
 
04/27/2018
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
2, 3 04/23/2018
 
04/27/2018
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
ISFSI LOADING CAMPAIGN INSPECTION
 
2, 3 05/14/2018
 
05/18/2018
 
IP 60855.1
 
000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants
 
OCCUPATIONAL DOSE ASSESSMENT Mod 04
 
2, 3 05/21/2018
 
05/25/2018
 
IP 71124.04
 
000728 Occupational Dose Assessment
 
ACCESS CONTROL, EQUIP PERF, TRAINING
 
2, 3 08/06/2018
 
08/10/2018
 
IP 71130.02
 
000734 Access Control
 
2, 3 08/06/2018
 
08/10/2018
 
IP 71130.04
 
000736 Equipment Performance, Testing, and Maintenance
 
2, 3 08/06/2018
 
08/10/2018
 
IP 71130.07
 
000739 Security Training
 
2, 3 08/06/2018
 
08/10/2018
 
IP 71151 001338 Performance Indicator Verification
 
2, 3 08/06/2018
 
08/10/2018
 
IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations
 
REMP Mod 07
 
2, 3 09/17/2018
 
09/21/2018
 
IP 71124.07
 
000731 Radiological Environmental Monitoring Program
 
Unit 2 ISI
 
2 10/22/2018
 
10/26/2018


IP 71111.08G
2, 3 04/23/2018 04/27/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 04/23/2018 04/27/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls ISFSI LOADING CAMPAIGN INSPECTION


000701 Inservice Inspection Activities - BWR
2, 3 05/14/2018 05/18/2018 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants OCCUPATIONAL DOSE ASSESSMENT Mod 04


2/8/2018 5:03:26 PM
2, 3 05/21/2018 05/25/2018 IP 71124.04 000728 Occupational Dose Assessment ACCESS CONTROL, EQUIP PERF, TRAINING


Page
2, 3 08/06/2018 08/10/2018 IP 71130.02 000734 Access Control 2, 3 08/06/2018 08/10/2018 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 2, 3 08/06/2018 08/10/2018 IP 71130.07 000739 Security Training 2, 3 08/06/2018 08/10/2018 IP 71151 001338 Performance Indicator Verification 2, 3 08/06/2018 08/10/2018 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations REMP Mod 07


of
2, 3 09/17/2018 09/21/2018 IP 71124.07 000731 Radiological Environmental Monitoring Program Unit 2 ISI


This report does not include INPO and OUTAGE activities.
2 10/22/2018 10/26/2018 IP 71111.08G 000701 Inservice Inspection Activities - BWR 2/8/2018 5:03:26 PM Page 1 of 4 This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Line 204: Line 91:
IP 22 Inspection Activity Plan Report
IP 22 Inspection Activity Plan Report


Peach Bottom
Peach Bottom 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count RAD HAZARD, ALARA, AIR ACT CNTRL Mods 01, 02, 03
 
01/01/2018 - 12/31/2019
 
Unit Start End Activity CAC Title Staff Count
 
RAD HAZARD, ALARA, AIR ACT CNTRL Mods 01, 02, 03
 
2, 3 10/29/2018
 
11/02/2018
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
2, 3 10/29/2018
 
11/02/2018
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
2, 3 10/29/2018
 
11/02/2018
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
UNIT 2 - LICENSE RENEWAL PHASE 4
 
2 11/26/2018
 
11/30/2018
 
IP 71003 000687 Post-Approval Site Inspection for License Renewal
 
RAD SAFETY Mods 01, 02, 03,04, PI (OR01, PR01)
 
2, 3 12/10/2018
 
12/14/2018
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
2, 3 12/10/2018
 
12/14/2018
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
2, 3 12/10/2018
 
12/14/2018
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
2, 3 12/10/2018
 
12/14/2018
 
IP 71124.04
 
000728 Occupational Dose Assessment
 
2, 3 12/10/2018
 
12/14/2018
 
IP 71151 000746 Performance Indicator Verification
 
EQ PROGRAM
 
2, 3 01/14/2019
 
01/18/2019
 
IP 71111.21N
 
000714 Design Bases Assurance Inspection (Programs)
 
2, 3 01/28/2019


02/01/2019
2, 3 10/29/2018 11/02/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 10/29/2018 11/02/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 2, 3 10/29/2018 11/02/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation UNIT 2 - LICENSE RENEWAL PHASE 4


IP 71111.21N
2 11/26/2018 11/30/2018 IP 71003 000687 Post-Approval Site Inspection for License Renewal RAD SAFETY Mods 01, 02, 03,04, PI (OR01, PR01)


000714 Design Bases Assurance Inspection (Programs)
2, 3 12/10/2018 12/14/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 12/10/2018 12/14/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 2, 3 12/10/2018 12/14/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 12/10/2018 12/14/2018 IP 71124.04 000728 Occupational Dose Assessment 2, 3 12/10/2018 12/14/2018 IP 71151 000746 Performance Indicator Verification EQ PROGRAM


2, 3 01/14/2019 01/18/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)
2, 3 01/28/2019 02/01/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)
PEACH BOTTOM INITIAL OL EXAM
PEACH BOTTOM INITIAL OL EXAM


2, 3 01/28/2019
2, 3 01/28/2019 02/01/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
 
2, 3 02/25/2019 03/08/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
02/01/2019
 
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
 
2, 3 02/25/2019
 
03/08/2019
 
EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
 
EP PROGRAM INSPECTION
EP PROGRAM INSPECTION


2, 3 03/04/2019
2, 3 03/04/2019 03/08/2019 IP 71114.02 000717 Alert and Notification System Testing 2, 3 03/04/2019 03/08/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 2, 3 03/04/2019 03/08/2019 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 2, 3 03/04/2019 03/08/2019 IP 71151 001397 Performance Indicator Verification PB REQUAL INSP WITH P/F RESULTS
 
03/08/2019
 
IP 71114.02
 
000717 Alert and Notification System Testing
 
2, 3 03/04/2019
 
03/08/2019
 
IP 71114.03
 
000718 Emergency Response Organization Staffing and Augmentation System
 
2, 3 03/04/2019
 
03/08/2019
 
IP 71114.05
 
000720 Correction of Emergency Preparedness Weaknesses and Deficiencies
 
2, 3 03/04/2019
 
03/08/2019
 
IP 71151 001397 Performance Indicator Verification
 
PB REQUAL INSP WITH P/F RESULTS
 
2, 3 03/11/2019
 
03/15/2019
 
IP 71111.11A
 
000703 Licensed Operator Requalification Program and Licensed Operator Performance -
 
Annual 2, 3 03/11/2019
 
03/15/2019
 
IP 71111.11B
 
000704 Licensed Operator Requalification Program and Licensed Operator Performance -
 
Biennial 2/8/2018 5:03:26 PM
 
Page
 
of


This report does not include INPO and OUTAGE activities.
2, 3 03/11/2019 03/15/2019 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance -
Annual 2, 3 03/11/2019 03/15/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance -
Biennial 2/8/2018 5:03:26 PM Page 2 of 4 This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Line 378: Line 117:
IP 22 Inspection Activity Plan Report
IP 22 Inspection Activity Plan Report


Peach Bottom
Peach Bottom 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count CYBER MS8
 
01/01/2018 - 12/31/2019
 
Unit Start End Activity CAC Title Staff Count
 
CYBER MS8
 
2, 3 03/18/2019
 
03/22/2019
 
IP 71130.10P
 
000741 Cyber Security
 
2, 3 04/01/2019
 
04/05/2019
 
IP 71130.10P
 
000741 Cyber Security
 
ACCESS CONTROL, PROTECTIVE STRATEGY, TSR
 
2, 3 03/25/2019
 
03/29/2019
 
IP 71130.02
 
000734 Access Control
 
2, 3 03/25/2019
 
03/29/2019
 
IP 71130.05
 
000737 Protective Strategy Evaluation
 
2, 3 03/25/2019
 
03/29/2019
 
IP 71130.14
 
000743 Review of Power Reactor Target Sets
 
2, 3 03/25/2019
 
03/29/2019
 
IP 71151 001338 Performance Indicator Verification
 
RAD EFFLUENTS Mod 06
 
2, 3 04/15/2019
 
04/19/2019
 
IP 71124.06
 
000730 Radioactive Gaseous and Liquid Effluent Treatment
 
Triennial Heat Sink
 
2, 3 05/13/2019
 
05/17/2019
 
IP 71111.07T
 
000700 Heat Sink Performance -Triennial
 
RAD HAZARD & ALARA Mods 01, 02
 
2, 3 05/13/2019
 
05/17/2019
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
2, 3 05/13/2019
 
05/17/2019
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
PI&R BIENNIAL
 
2, 3 06/10/2019
 
06/14/2019
 
IP 71152B 000747 Problem Identification and Resolution
 
2, 3 06/24/2019
 
06/28/2019
 
IP 71152B 000747 Problem Identification and Resolution
 
Radwaste
 
2, 3 07/29/2019
 
08/02/2019
 
IP 71124.08


000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and
2, 3 03/18/2019 03/22/2019 IP 71130.10P 000741 Cyber Security 2, 3 04/01/2019 04/05/2019 IP 71130.10P 000741 Cyber Security ACCESS CONTROL, PROTECTIVE STRATEGY, TSR


Transportation
2, 3 03/25/2019 03/29/2019 IP 71130.02 000734 Access Control 2, 3 03/25/2019 03/29/2019 IP 71130.05 000737 Protective Strategy Evaluation 2, 3 03/25/2019 03/29/2019 IP 71130.14 000743 Review of Power Reactor Target Sets 2, 3 03/25/2019 03/29/2019 IP 71151 001338 Performance Indicator Verification RAD EFFLUENTS Mod 06


MC&A
2, 3 04/15/2019 04/19/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Triennial Heat Sink


2 08/12/2019
2, 3 05/13/2019 05/17/2019 IP 71111.07T 000700 Heat Sink Performance -Triennial RAD HAZARD & ALARA Mods 01, 02


08/16/2019
2, 3 05/13/2019 05/17/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 05/13/2019 05/17/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls PI&R BIENNIAL


IP 71130.11
2, 3 06/10/2019 06/14/2019 IP 71152B 000747 Problem Identification and Resolution 2, 3 06/24/2019 06/28/2019 IP 71152B 000747 Problem Identification and Resolution Radwaste


000742 Material Control and Accounting (MC&A)
2, 3 07/29/2019 08/02/2019 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation MC&A


2 08/12/2019 08/16/2019 IP 71130.11 000742 Material Control and Accounting (MC&A)
INSERVICE INSPECTION - UNIT 3
INSERVICE INSPECTION - UNIT 3


3 10/28/2019
3 10/28/2019 11/01/2019 IP 71111.08G 000701 Inservice Inspection Activities - BWR RAD HAZARD, ALARA, AIR ACT CNTRL Mods 01, 02, 03
 
11/01/2019
 
IP 71111.08G
 
000701 Inservice Inspection Activities - BWR
 
RAD HAZARD, ALARA, AIR ACT CNTRL Mods 01, 02, 03
 
2, 3 10/28/2019
 
11/01/2019
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
2, 3 10/28/2019
 
11/01/2019
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
2/8/2018 5:03:26 PM
 
Page
 
of


This report does not include INPO and OUTAGE activities.
2, 3 10/28/2019 11/01/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 10/28/2019 11/01/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 2/8/2018 5:03:26 PM Page 3 of 4 This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Line 548: Line 144:
IP 22 Inspection Activity Plan Report
IP 22 Inspection Activity Plan Report


Peach Bottom
Peach Bottom 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count RAD HAZARD, ALARA, AIR ACT CNTRL Mods 01, 02, 03
 
01/01/2018 - 12/31/2019
 
Unit Start End Activity CAC Title Staff Count
 
RAD HAZARD, ALARA, AIR ACT CNTRL Mods 01, 02, 03
 
2, 3 10/28/2019
 
11/01/2019
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
RAD SAFETY Mods 01, 02, 03,04, PI (OR01, PR01)
 
2, 3 12/02/2019
 
12/06/2019
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
2, 3 12/02/2019
 
12/06/2019
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
2, 3 12/02/2019
 
12/06/2019
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
2, 3 12/02/2019
 
12/06/2019
 
IP 71124.04
 
000729 Occupational Dose Assessment
 
2, 3 12/02/2019
 
12/06/2019
 
IP 71151 000746 Performance Indicator Verification
 
2/8/2018 5:03:26 PM
 
Page


of
2, 3 10/28/2019 11/01/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation RAD SAFETY Mods 01, 02, 03,04, PI (OR01, PR01)


This report does not include INPO and OUTAGE activities.
2, 3 12/02/2019 12/06/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 12/02/2019 12/06/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 2, 3 12/02/2019 12/06/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 12/02/2019 12/06/2019 IP 71124.04 000729 Occupational Dose Assessment 2, 3 12/02/2019 12/06/2019 IP 71151 000746 Performance Indicator Verification 2/8/2018 5:03:26 PM Page 4 of 4 This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.

Latest revision as of 10:06, 6 January 2025

Annual Assessment Letter for Peach Bottom Atomic Power Station Units 2 and 3 -(Report 05000277-2017006 and 05000278-2017006 Report 05000277-2017402 and 05000278-2017402 Report 05000277-2017501 and 05000278-2017501)
ML18047A006
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/28/2018
From: James Krafty
Reactor Projects Region 1 Branch 4
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Krafty J
Shared Package
ML18046A367 List:
References
IR 2017006, IR 2017402, IR 2017501
Download: ML18047A006 (7)


Text

February 28, 2018

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 - (REPORT 05000277/

2017006 AND 05000278/2017006 REPORT 05000277/2017402 AND 05000278/2017402 REPORT 05000277/2017501 AND 05000278/2017501)

Dear Mr. Hanson:

The NRC has completed its end-of-cycle performance assessment of Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3, reviewing performance indicators (PIs),

inspection results, and enforcement actions from January 1, 2017 through December 31, 2017.

This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at PBAPS Units 2 and 3 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

Additionally, the NRC plans to conduct Inspection Procedure 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plant and 71003, Post Approval Site Inspection For License Renewal at Unit 2.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 610-337-5120 with any questions you may have regarding this letter.

Sincerely,

/RA/

James A. Krafty, Acting Chief Reactor Projects Branch 4 Division of Reactor Projects

Docket Nos. 50-277 and 50-278 License Nos. DPR-44 and DPR-56

Enclosure:

Inspection/Activity Plan

ML18047A006

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SBarber JKrafty DATE 2/28/18 2/28/18

Peach Bottom 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count Annual Sample - Structural Monitoring Program

2, 3 01/29/2018 02/02/2018 IP 71152 000748 Problem Identification and Resolution RAD MONITORING INSTRU Mod 05

2, 3 03/26/2018 03/30/2018 IP 71124.05 000729 Radiation Monitoring Instrumentation TRIENNIAL FIRE PROTECTION

2, 3 04/02/2018 04/06/2018 IP 71111.05T 000696 Fire Protection (Triennial)

2, 3 04/16/2018 04/20/2018 IP 71111.05T 000696 Fire Protection (Triennial)

EP EXERCISE INSPECTION

2, 3 04/16/2018 04/20/2018 IP 71114.01 000716 Exercise Evaluation RAD HAZARD & ALARA Mods 01, 02

2, 3 04/23/2018 04/27/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 04/23/2018 04/27/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls ISFSI LOADING CAMPAIGN INSPECTION

2, 3 05/14/2018 05/18/2018 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants OCCUPATIONAL DOSE ASSESSMENT Mod 04

2, 3 05/21/2018 05/25/2018 IP 71124.04 000728 Occupational Dose Assessment ACCESS CONTROL, EQUIP PERF, TRAINING

2, 3 08/06/2018 08/10/2018 IP 71130.02 000734 Access Control 2, 3 08/06/2018 08/10/2018 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 2, 3 08/06/2018 08/10/2018 IP 71130.07 000739 Security Training 2, 3 08/06/2018 08/10/2018 IP 71151 001338 Performance Indicator Verification 2, 3 08/06/2018 08/10/2018 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations REMP Mod 07

2, 3 09/17/2018 09/21/2018 IP 71124.07 000731 Radiological Environmental Monitoring Program Unit 2 ISI

2 10/22/2018 10/26/2018 IP 71111.08G 000701 Inservice Inspection Activities - BWR 2/8/2018 5:03:26 PM Page 1 of 4 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Peach Bottom 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count RAD HAZARD, ALARA, AIR ACT CNTRL Mods 01, 02, 03

2, 3 10/29/2018 11/02/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 10/29/2018 11/02/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 2, 3 10/29/2018 11/02/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation UNIT 2 - LICENSE RENEWAL PHASE 4

2 11/26/2018 11/30/2018 IP 71003 000687 Post-Approval Site Inspection for License Renewal RAD SAFETY Mods 01, 02, 03,04, PI (OR01, PR01)

2, 3 12/10/2018 12/14/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 12/10/2018 12/14/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 2, 3 12/10/2018 12/14/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 12/10/2018 12/14/2018 IP 71124.04 000728 Occupational Dose Assessment 2, 3 12/10/2018 12/14/2018 IP 71151 000746 Performance Indicator Verification EQ PROGRAM

2, 3 01/14/2019 01/18/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

2, 3 01/28/2019 02/01/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

PEACH BOTTOM INITIAL OL EXAM

2, 3 01/28/2019 02/01/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2, 3 02/25/2019 03/08/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

EP PROGRAM INSPECTION

2, 3 03/04/2019 03/08/2019 IP 71114.02 000717 Alert and Notification System Testing 2, 3 03/04/2019 03/08/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 2, 3 03/04/2019 03/08/2019 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 2, 3 03/04/2019 03/08/2019 IP 71151 001397 Performance Indicator Verification PB REQUAL INSP WITH P/F RESULTS

2, 3 03/11/2019 03/15/2019 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance -

Annual 2, 3 03/11/2019 03/15/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance -

Biennial 2/8/2018 5:03:26 PM Page 2 of 4 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Peach Bottom 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count CYBER MS8

2, 3 03/18/2019 03/22/2019 IP 71130.10P 000741 Cyber Security 2, 3 04/01/2019 04/05/2019 IP 71130.10P 000741 Cyber Security ACCESS CONTROL, PROTECTIVE STRATEGY, TSR

2, 3 03/25/2019 03/29/2019 IP 71130.02 000734 Access Control 2, 3 03/25/2019 03/29/2019 IP 71130.05 000737 Protective Strategy Evaluation 2, 3 03/25/2019 03/29/2019 IP 71130.14 000743 Review of Power Reactor Target Sets 2, 3 03/25/2019 03/29/2019 IP 71151 001338 Performance Indicator Verification RAD EFFLUENTS Mod 06

2, 3 04/15/2019 04/19/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Triennial Heat Sink

2, 3 05/13/2019 05/17/2019 IP 71111.07T 000700 Heat Sink Performance -Triennial RAD HAZARD & ALARA Mods 01, 02

2, 3 05/13/2019 05/17/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 05/13/2019 05/17/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls PI&R BIENNIAL

2, 3 06/10/2019 06/14/2019 IP 71152B 000747 Problem Identification and Resolution 2, 3 06/24/2019 06/28/2019 IP 71152B 000747 Problem Identification and Resolution Radwaste

2, 3 07/29/2019 08/02/2019 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation MC&A

2 08/12/2019 08/16/2019 IP 71130.11 000742 Material Control and Accounting (MC&A)

INSERVICE INSPECTION - UNIT 3

3 10/28/2019 11/01/2019 IP 71111.08G 000701 Inservice Inspection Activities - BWR RAD HAZARD, ALARA, AIR ACT CNTRL Mods 01, 02, 03

2, 3 10/28/2019 11/01/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 10/28/2019 11/01/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 2/8/2018 5:03:26 PM Page 3 of 4 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Peach Bottom 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count RAD HAZARD, ALARA, AIR ACT CNTRL Mods 01, 02, 03

2, 3 10/28/2019 11/01/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation RAD SAFETY Mods 01, 02, 03,04, PI (OR01, PR01)

2, 3 12/02/2019 12/06/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 12/02/2019 12/06/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 2, 3 12/02/2019 12/06/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 12/02/2019 12/06/2019 IP 71124.04 000729 Occupational Dose Assessment 2, 3 12/02/2019 12/06/2019 IP 71151 000746 Performance Indicator Verification 2/8/2018 5:03:26 PM Page 4 of 4 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report