{{#Wiki_filter:Decay Time TR 3.9.1 Watts Bar - Unit 2 3.9-1 Technical Requirements (developmental) A TR 3.9 REFUELING OPERATIONS  
{{#Wiki_filter:Decay Time TR 3.9.1 Watts Bar - Unit 2 3.9-1 Technical Requirements (developmental)
 
A TR 3.9 REFUELING OPERATIONS TR 3.9.1 Decay Time TR 3.9.1 The reactor shall be subcritical for > 100 hours.
TR 3.9.1 Decay Time  
APPLICABILITY:
 
During movement of irradiated fuel in the reactor vessel.
TR 3.9.1 The reactor shall be subcritical for  
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
> 100 hours.  
Reactor subcritical for  
 
APPLICABILITY: During movement of irradiated fuel in the reactor vessel.  
 
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Reactor subcritical for  
< 100 hours.
< 100 hours.
A.1 Suspend all operations involving movement of  
A.1 Suspend all operations involving movement of irradiated fuel in the reactor vessel.
Immediately TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.1.1 Verify the reactor has been subcritical for > 100 hours by confirming the date and time of subcriticality.
Prior to movement of irradiated fuel in the reactor vessel


irradiated fuel in the  
Communications TR 3.9.2 Watts Bar - Unit 2 3.9-2 Technical Requirements (developmental)
A TR 3.9 REFUELING OPERATIONS TR 3.9.2 Communications TR 3.9.2 Direct communications shall be maintained between the control room and personnel at the refueling station.
APPLICABILITY:
During CORE ALTERATIONS.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Direct communications between the control room and personnel at the refueling station cannot be maintained.
A.1 Suspend all CORE ALTERATIONS.
Immediately TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.2.1 Demonstrate that direct communications between the control room and personnel at the refueling station are established.
1 hour prior to the start of CORE ALTERATIONS AND Each 12 hours during CORE ALTERATIONS


reactor vessel.
Refueling Machine TR 3.9.3 Watts Bar - Unit 2 3.9-3 Technical Requirements (developmental)
A TR 3.9 REFUELING OPERATIONS TR 3.9.3 Refueling Machine TR 3.9.3 The Refueling Machine and Auxiliary Hoist shall be used for movement of fuel assemblies or drive shafts and shall be OPERABLE as follows:
: a. The Refueling Machine shall have a capacity of 3150 pounds, and two electrical overload cutoff limits of 2650 pounds and 2800 pounds, respectively.
: b. The Auxiliary Hoist shall have a capacity of 1200 pounds and a load indicator shall be used to indicate the lifting of loads > 1190 pounds.
APPLICABILITY:
During movement of fuel assemblies or drive shafts within the reactor pressure vessel.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Refueling Machine inoperable.
A.1 Suspend use of Refueling Machine from operations involving the movement of fuel assemblies within the reactor pressure vessel.
Immediately B.
Auxiliary Hoist inoperable.
B.1 Suspend use of Auxiliary Hoist from operations involving the movement of drive shafts within the reactor pressure vessel.
Immediately  
Immediately  


TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR  3.9.1.1 Verify the reactor has been subcritical for
Refueling Machine TR 3.9.3 Watts Bar - Unit 2 3.9-4 Technical Requirements (developmental)
> 100 hours by confirming the date and time of subcriticality.
A TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.3.1 For each required Refueling Machine, perform a load test of 3150 pounds and demonstrate an automatic electrical load cutoff before the crane load is  
Prior to movement of
> 2650 pounds. Demonstrate a second automatic electrical load cutoff before the crane load is  
 
> 2800 pounds.
irradiated fuel in the
18 months TSR 3.9.3.2 For each required Auxiliary Hoist and associated load indicator, perform a load test of 1200 pounds.
 
Within 100 hours prior to start of movement of drive shafts within the reactor pressure vessel  
reactor vessel
 
Communications TR 3.9.2  Watts Bar - Unit 2 3.9-2 Technical Requirements  (developmental) A TR 3.9  REFUELING OPERATIONS
 
TR 3.9.2  Communications
 
TR  3.9.2 Direct communications shall be maintained between the control room and personnel at the refueling station.
 
APPLICABILITY: During CORE ALTERATIONS.
 
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Direct communications between the control room
 
and personnel at the
 
refueling station cannot be
 
maintained. A.1 Suspend all CORE ALTERATIONS.
Immediately
 
TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR  3.9.2.1 Demonstrate that direct communications between the control room and personnel at the refueling station are established.
1 hour prior to the
 
start of CORE
 
ALTERATIONS AND Each 12 hours
 
during CORE
 
ALTERATIONS
 
Refueling Machine TR 3.9.3 Watts Bar - Unit 2 3.9-3 Technical Requirements (developmental) A TR 3.9  REFUELING OPERATIONS
 
TR 3.9.3  Refueling Machine
 
TR  3.9.3 The Refueling Machine and Auxiliary Hoist shall be used for movement of fuel assemblies or drive shafts and shall be OPERABLE as follows:
: a. The Refueling Machine shall have a capacity of  3150 pounds, and two electrical overload cutoff limits of  2650 pounds and  2800 pounds, respectively.
: b. The Auxiliary Hoist shall have a capacity of  1200 pounds and a load indicator shall be used to indicate the lifting of loads > 1190 pounds.
 
APPLICABILITY: During movement of fuel assemblies or drive shafts within the reactor pressure vessel.
 
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Refueling Machine inoperable. A.1 Suspend use of Refueling Machine from operations
 
involving the movement
 
of fuel assemblies within
 
the reactor pressure vessel. Immediately B. Auxiliary Hoist inoperable. B.1 Suspend use of Auxiliary Hoist from operations
 
involving the movement
 
of drive shafts within the
 
reactor pressure vessel.
Immediately Refueling Machine TR 3.9.3  Watts Bar - Unit 2 3.9-4 Technical Requirements  (developmental) A TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.3.1 For each required Refueling Machine, perform a load test of 3150 pounds and demonstrate an automatic electrical load cutoff before the crane load is  
> 2650 pounds. Demonstrate a second automatic  
 
electrical load cutoff before the crane load is  
> 2800 pounds. 18 months TSR 3.9.3.2 For each required Auxiliary Hoist and associated load indicator, perform a load test of 1200 pounds.
Within 100 hours prior to start of  
 
movement of drive  
 
shafts within the  
 
reactor pressure vessel Crane Travel - Spent Fuel Storage Pool Building TR 3.9.4  Watts Bar - Unit 2 3.9-5 Technical Requirements  (developmental) A TR 3.9  REFUELING OPERATIONS
 
TR 3.9.4  Crane Travel - Spent Fuel Storage Pool Building
 
TR  3.9.4 Loads > 2059 pounds shall be prohibited from travel over fuel assemblies in the spent fuel pool.
 
APPLICABILITY: With fuel assemblies in the spent fuel pool.
----------------------------------------------NOTE----------------------------------------------
TR 3.0.3 is not applicable.
-----------------------------------------------------------------------------------------------------
 
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Technical Requirement not met. A.1 Place the crane load in a safe condition.
Immediately
 
TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR  3.9.4.1 Demonstrate crane interlocks and physical stops which prevent crane travel over fuel assemblies to be
 
OPERABLE.
Within 7 days prior to
 
crane use AND At least once per
 
7 days thereafter
 
during crane


operation}}
Crane Travel - Spent Fuel Storage Pool Building TR 3.9.4 Watts Bar - Unit 2 3.9-5 Technical Requirements (developmental)
A TR 3.9 REFUELING OPERATIONS TR 3.9.4 Crane Travel - Spent Fuel Storage Pool Building TR 3.9.4 Loads > 2059 pounds shall be prohibited from travel over fuel assemblies in the spent fuel pool.
APPLICABILITY:
With fuel assemblies in the spent fuel pool.
----------------------------------------------NOTE----------------------------------------------
TR 3.0.3 is not applicable.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Technical Requirement not met.
A.1 Place the crane load in a safe condition.
Immediately TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.4.1 Demonstrate crane interlocks and physical stops which prevent crane travel over fuel assemblies to be OPERABLE.
Within 7 days prior to crane use AND At least once per 7 days thereafter during crane operation}}

Latest revision as of 06:27, 14 January 2025

Developmental Revision B - Technical Requirements Manual TR 3.9 - Refueling Operations
ML100550630
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 02/02/2010
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
References
Download: ML100550630 (5)


Text

Decay Time TR 3.9.1 Watts Bar - Unit 2 3.9-1 Technical Requirements (developmental)

A TR 3.9 REFUELING OPERATIONS TR 3.9.1 Decay Time TR 3.9.1 The reactor shall be subcritical for > 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />.

APPLICABILITY:

During movement of irradiated fuel in the reactor vessel.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Reactor subcritical for

< 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />.

A.1 Suspend all operations involving movement of irradiated fuel in the reactor vessel.

Immediately TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.1.1 Verify the reactor has been subcritical for > 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> by confirming the date and time of subcriticality.

Prior to movement of irradiated fuel in the reactor vessel

Communications TR 3.9.2 Watts Bar - Unit 2 3.9-2 Technical Requirements (developmental)

A TR 3.9 REFUELING OPERATIONS TR 3.9.2 Communications TR 3.9.2 Direct communications shall be maintained between the control room and personnel at the refueling station.

APPLICABILITY:

During CORE ALTERATIONS.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Direct communications between the control room and personnel at the refueling station cannot be maintained.

A.1 Suspend all CORE ALTERATIONS.

Immediately TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.2.1 Demonstrate that direct communications between the control room and personnel at the refueling station are established.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> prior to the start of CORE ALTERATIONS AND Each 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during CORE ALTERATIONS

Refueling Machine TR 3.9.3 Watts Bar - Unit 2 3.9-3 Technical Requirements (developmental)

A TR 3.9 REFUELING OPERATIONS TR 3.9.3 Refueling Machine TR 3.9.3 The Refueling Machine and Auxiliary Hoist shall be used for movement of fuel assemblies or drive shafts and shall be OPERABLE as follows:

a. The Refueling Machine shall have a capacity of 3150 pounds, and two electrical overload cutoff limits of 2650 pounds and 2800 pounds, respectively.
b. The Auxiliary Hoist shall have a capacity of 1200 pounds and a load indicator shall be used to indicate the lifting of loads > 1190 pounds.

APPLICABILITY:

During movement of fuel assemblies or drive shafts within the reactor pressure vessel.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Refueling Machine inoperable.

A.1 Suspend use of Refueling Machine from operations involving the movement of fuel assemblies within the reactor pressure vessel.

Immediately B.

Auxiliary Hoist inoperable.

B.1 Suspend use of Auxiliary Hoist from operations involving the movement of drive shafts within the reactor pressure vessel.

Immediately

Refueling Machine TR 3.9.3 Watts Bar - Unit 2 3.9-4 Technical Requirements (developmental)

A TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.3.1 For each required Refueling Machine, perform a load test of 3150 pounds and demonstrate an automatic electrical load cutoff before the crane load is

> 2650 pounds. Demonstrate a second automatic electrical load cutoff before the crane load is

> 2800 pounds.

18 months TSR 3.9.3.2 For each required Auxiliary Hoist and associated load indicator, perform a load test of 1200 pounds.

Within 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior to start of movement of drive shafts within the reactor pressure vessel

Crane Travel - Spent Fuel Storage Pool Building TR 3.9.4 Watts Bar - Unit 2 3.9-5 Technical Requirements (developmental)

A TR 3.9 REFUELING OPERATIONS TR 3.9.4 Crane Travel - Spent Fuel Storage Pool Building TR 3.9.4 Loads > 2059 pounds shall be prohibited from travel over fuel assemblies in the spent fuel pool.

APPLICABILITY:

With fuel assemblies in the spent fuel pool.


NOTE----------------------------------------------

TR 3.0.3 is not applicable.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Technical Requirement not met.

A.1 Place the crane load in a safe condition.

Immediately TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.4.1 Demonstrate crane interlocks and physical stops which prevent crane travel over fuel assemblies to be OPERABLE.

Within 7 days prior to crane use AND At least once per 7 days thereafter during crane operation