IR 05000220/2018411: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(8 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18325A073
| number = ML18325A073
| issue date = 11/20/2018
| issue date = 11/20/2018
| title = Station: NRC Security Baseline Inspection Report 05000220/2018411 and 05000410/2018411 (Letter Only)
| title = NRC Security Baseline Inspection Report 05000220/2018411 and 05000410/2018411 (Letter Only)
| author name = McKinley R R
| author name = Mckinley R
| author affiliation = NRC/RGN-I/DRS
| author affiliation = NRC/RGN-I/DRS
| addressee name = Hanson B
| addressee name = Hanson B
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406
{{#Wiki_filter:November 20, 2018
-2713 November 20, 2018 Mr. Bryan Hanson Senior Vice President, Exelon Generation Co., LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.


Warrenville, IL 60555
==SUBJECT:==
NINE MILE POINT NUCLEAR STATION - NRC SECURITY BASELINE


SUBJECT: NINE MILE POINT NUCLEAR STATION
INSPECTION REPORT 05000220/2018411 AND 05000410/2018411
- NRC SECURITY BASELINE INSPECTION REPORT 05000220/2018411 AND 05000410/20 1 8411


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==
On October 18 , 2018 , the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Nine Mile Point Nuclear Station and discussed the results of the inspection with Mr. Robert Kreider
On October 18, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Nine Mile Point Nuclear Station and discussed the results of the inspection with Mr. Robert Kreider, Plant Manager and other members of your staff. The results are documented in the enclosed report.
, Plant Manager and other members of your staff.


The results are documented in the enclosed report.
NRC inspectors documented one finding of very low security significance (Green) in this report.


NRC inspectors documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements.
This finding involved a violation of NRC requirements. The NRC is treating this violation as non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.


The NRC is treating this violation as non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
One cross-cutting aspect was assigned to a finding in the area of Human Performance, Avoid Complacency. Specifically, Exelon failed to recognize and plan for the possibility of mistakes, latent issues, and inherent risk [H.12].  


One cross-cutting aspect was assigned to a finding in the area of Human Performance, Avoid Complacency. Specifically, Exelon failed to recognize and plan for the possibility of mistakes, latent issues, and inherent risk [H.12].
If you contest this violation or the significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555 0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Nine Mile Point Nuclear Station.
If you contest this violation or the significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555 0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Nine Mile Point Nuclear Station. If you disagree with the cross
-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555
-0001; with copies to the Regional Administrator, Region I; and the NRC resident inspector at the Nine Mile Point Nuclear Station
. Enclosure transmitted herewith contains Sensitive, Unclassified, Non-Safeguards Information.


When separated from the Enclosure , the transmittal document is decontrolled. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading
If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; and the NRC resident inspector at the Nine Mile Point Nuclear Station.
-rm/adams.html and at the NRC's Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding."


However, the enclosed report contains Security-Related Information; it will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security
Enclosure transmitted herewith contains Sensitive, Unclassified, Non-Safeguards Information. When separated from the Enclosure, the transmittal document is decontrolled. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRCs Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.
-Related Information, please mark your entire response "Security
-Related Information
-Withhold from public disclosure under 10 CFR 2.390", in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).


Sincerely,/RA/ Raymond R. McKinley, Chief Plant Support Branch Division of Reactor Safety Docket Nos.
However, the enclosed report contains Security-Related Information; it will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).


50-220 and 50
Sincerely,
-410 License Nos.
/RA/


DPR-63 and NPF-69
Raymond R. McKinley, Chief Plant Support Branch Division of Reactor Safety


===Enclosure:===
Docket Nos.
 
50-220 and 50-410 License Nos. DPR-63 and NPF-69
 
Enclosure:
Non-Public Inspection Report 05000220/2018411 and 05000410/2018411  
Non-Public Inspection Report 05000220/2018411 and 05000410/2018411  


===w/Attachment:===
w/Attachment: Supplemental Information  
Supplemental Information cc w/o encl
 
; w/o OUO-SRI: Distribution via ListServ cc w encl; w OUO-SRI: M. Kunzweiler, Manager, Nuclear Security A. Peterson, State Liaison Office Designee, NY State Energy, Research & Development Authority
cc w/o encl; w/o OUO-SRI: Distribution via ListServ  


Cover letter) ML18325A073 ADAMS ACCESSION NUMBER: (Cover letter w/rpt.
cc w encl; w OUO-SRI:
M. Kunzweiler, Manager, Nuclear Security A. Peterson, State Liaison Office Designee, NY State Energy, Research & Development Authority


NP) ML18325A069 Cover Letter SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter w/ Enclosure SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RII/DRS RI/DRS RI/DRP RI/DRS NAME KHussar JTornow email JCherubini ECarfang RMcKinley DATE 11/13/2018 11/13/2018 11/13/2018 11/19/2018 11/20/2018
Cover letter) ML18325A073 ADAMS ACCESSION NUMBER: (Cover letter w/rpt.NP) ML18325A069 Cover Letter SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter w/ Enclosure SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RII/DRS RI/DRS RI/DRP RI/DRS NAME KHussar JTornow email JCherubini ECarfang RMcKinley DATE 11/13/2018 11/13/2018 11/13/2018 11/19/2018 11/20/2018
}}
}}

Latest revision as of 09:07, 5 January 2025

NRC Security Baseline Inspection Report 05000220/2018411 and 05000410/2018411 (Letter Only)
ML18325A073
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 11/20/2018
From: Raymond Mckinley
Division of Reactor Safety I
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2018411
Download: ML18325A073 (3)


Text

November 20, 2018

SUBJECT:

NINE MILE POINT NUCLEAR STATION - NRC SECURITY BASELINE

INSPECTION REPORT 05000220/2018411 AND 05000410/2018411

Dear Mr. Hanson:

On October 18, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Nine Mile Point Nuclear Station and discussed the results of the inspection with Mr. Robert Kreider, Plant Manager and other members of your staff. The results are documented in the enclosed report.

NRC inspectors documented one finding of very low security significance (Green) in this report.

This finding involved a violation of NRC requirements. The NRC is treating this violation as non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

One cross-cutting aspect was assigned to a finding in the area of Human Performance, Avoid Complacency. Specifically, Exelon failed to recognize and plan for the possibility of mistakes, latent issues, and inherent risk [H.12].

If you contest this violation or the significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555 0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Nine Mile Point Nuclear Station.

If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; and the NRC resident inspector at the Nine Mile Point Nuclear Station.

Enclosure transmitted herewith contains Sensitive, Unclassified, Non-Safeguards Information. When separated from the Enclosure, the transmittal document is decontrolled. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRCs Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information; it will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Raymond R. McKinley, Chief Plant Support Branch Division of Reactor Safety

Docket Nos.

50-220 and 50-410 License Nos. DPR-63 and NPF-69

Enclosure:

Non-Public Inspection Report 05000220/2018411 and 05000410/2018411

w/Attachment: Supplemental Information

cc w/o encl; w/o OUO-SRI: Distribution via ListServ

cc w encl; w OUO-SRI:

M. Kunzweiler, Manager, Nuclear Security A. Peterson, State Liaison Office Designee, NY State Energy, Research & Development Authority

Cover letter) ML18325A073 ADAMS ACCESSION NUMBER: (Cover letter w/rpt.NP) ML18325A069 Cover Letter SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter w/ Enclosure SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RII/DRS RI/DRS RI/DRP RI/DRS NAME KHussar JTornow email JCherubini ECarfang RMcKinley DATE 11/13/2018 11/13/2018 11/13/2018 11/19/2018 11/20/2018