Line 3: Line 3:
| issue date = 12/13/2007
| issue date = 12/13/2007
| title = ROP8 - Vermont Yankee - Change to Inspection Plan, 12/13/07
| title = ROP8 - Vermont Yankee - Change to Inspection Plan, 12/13/07
| author name = Powell R J
| author name = Powell R
| author affiliation = NRC/RGN-I/DRP/PB5
| author affiliation = NRC/RGN-I/DRP/PB5
| addressee name = Sullivan T A
| addressee name = Sullivan T
| addressee affiliation = Entergy Nuclear Operations, Inc
| addressee affiliation = Entergy Nuclear Operations, Inc
| docket = 05000271
| docket = 05000271
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION                                                         REGION I                                               475 ALLENDALE ROAD                                         KING OF PRUSSIA, PA 19406
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406 December 13, 2007 Mr. Theodore A. Sullivan Site Vice President Entergy Nuclear Operations, Inc.
 
Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500  
December 13, 2007  
 
Mr. Theodore A. Sullivan  
 
Site Vice President Entergy Nuclear Operations, Inc. Vermont Yankee Nuclear Power Station P.O. Box 0500  
 
185 Old Ferry Road  
 
Brattleboro, VT 05302-0500  


==SUBJECT:==
==SUBJECT:==
CHANGE TO THE INSPECTION PLAN - VERMONT YANKEE NUCLEAR                     POWER STATION  
CHANGE TO THE INSPECTION PLAN - VERMONT YANKEE NUCLEAR POWER STATION  


==Dear Mr. Sullivan:==
==Dear Mr. Sullivan:==
As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.
The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.
In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).


As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.
T. Sullivan 2
 
Please contact me at 610-337-6967 with any questions you may have regarding this letter or the inspection plan.
The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve
Sincerely,  
 
/RA/
any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature. 
Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-271 License No. DPR-28  
 
In accordance with 10 CFR 2.390 of the NRC's "Rules and Practices" a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
 
T. Sullivan 2 Please contact me at 610-337-6967 with any questions you may have regarding this letter or the inspection plan.
 
Sincerely,   /RA/
Raymond J. Powell, Chief Projects Branch 5  
 
Division of Reactor Projects  
 
Docket Nos. 50-271 License No. DPR-28  


==Enclosures:==
==Enclosures:==
Vermont Yankee Nuclear Power Station Inspection/Activity Plans  
Vermont Yankee Nuclear Power Station Inspection/Activity Plans cc w/encl:
 
M. R. Kansler, Chief Nuclear Officer and President, Entergy Nuclear Operations, Inc.
cc w/encl: M. R. Kansler, Chief Nuclear Officer and President, Entergy Nuclear Operations, Inc.
G. J. Taylor, Group President, Utility Operations J. Wayne Leonard, Chairman and Chief Executive Officer, Entergy Operations J. T. Herron, Senior Vice President, Entergy Nuclear Operations M. A. Balduzzi, Senior Vice President and Chief Operating Officer J. DeRoy, Vice President, Operations Support O. Limpias, Vice President, Engineering D. J. Mannai, Manager, Licensing, Vermont Yankee Nuclear Power Station E. Cota, Operating Experience Coordinator, Vermont Yankee Nuclear Power Station W. F. Maguire, General Manager, Plant Operations, Entergy Nuclear Operations, Inc.
G. J. Taylor, Group President, Utility Operations J. Wayne Leonard, Chairman and Chief Executive Officer, Entergy Operations J. T. Herron, Senior Vice President, Entergy Nuclear Operations M. A. Balduzzi, Senior Vice President and Chief Operating Officer J. DeRoy, Vice President, Operations Support O. Limpias, Vice President, Engineering D. J. Mannai, Manager, Licensing, Vermont Yankee Nuclear Power Station E. Cota, Operating Experience Coordinator, Vermont Yankee Nuclear Power Station  
N. L. Rademacher, Director, Engineering, Vermont Yankee Nuclear Power Station J. F. McCann, Director, Nuclear Safety and Licensing E. Harkness, Director of Oversight, Entergy Nuclear Operations, Inc.
 
W. F. Maguire, General Manager, Plant Operations, Entergy Nuclear Operations, Inc. N. L. Rademacher, Director, Engineering, Vermont Yankee Nuclear Power Station J. F. McCann, Director, Nuclear Safety and Licensing E. Harkness, Director of Oversight, Entergy Nuclear Operations, Inc.
Assistant General Counsel, Entergy Nuclear Operations, Inc.
Assistant General Counsel, Entergy Nuclear Operations, Inc.
J. H. Sniezek, PWR SRC Consultant  
J. H. Sniezek, PWR SRC Consultant M. D. Lyster, PWR SRC Consultant G. Edwards S. Lousteau, Treasury Department, Entergy Services, Inc.
 
D. O Dowd, Administrator, Radiological Health Section, DPHS, State of New Hampshire W. Irwin, Chief, CHP, Radiological Health, Vermont Department of Health Chief, Safety Unit, Office of the Attorney General, Commonwealth of Mass.
M. D. Lyster, PWR SRC Consultant G. Edwards S. Lousteau, Treasury Department, Entergy Services, Inc.
D. Lewis, Pillsbury, Winthrop, Shaw, Pittman LLP G. D. Bisbee, Esquire, Deputy Attorney General, Environmental Protection Bureau J. Block, Esquire J. P. Matteau, Executive Director, Windham Regional Commission D. Katz, Citizens Awareness Network (CAN)
D. O' Dowd, Administrator, Radiological Health Section, DPHS, State of New Hampshire W. Irwin, Chief, CHP, Radiological Health, Vermont Department of Health Chief, Safety Unit, Office of the Attorney General, Commonwealth of Mass.
R. Shadis, New England Coalition Staff G. Sachs, President/Staff Person, c/o Stopthesale J. Volz, Chairman, Public Service Board, State of Vermont Chairman, Board of Selectman, Town of Vernon
D. Lewis, Pillsbury, Winthrop, Shaw, Pittman LLP G. D. Bisbee, Esquire, Deputy Attorney General, Environmental Protection Bureau J. Block, Esquire J. P. Matteau, Executive Director, Windham Regional Commission  
 
D. Katz, Citizens Awareness Network (CAN)
R. Shadis, New England Coalition Staff G. Sachs, President/Staff Person, c/o Stopthesale J. Volz, Chairman, Public Service Board, State of Vermont  


Chairman, Board of Selectman, Town of Vernon
T. Sullivan 3
 
C. Pope, State of New Hampsire, SLO D. O'Brien, State of Vermont, SLO J. Giarrusso, SLO, MEMA, Commonwealth of Massachusetts U. Vanags, State Nuclear Engineer, Vermont Department of Public Service S. Shaw  
T. Sullivan 3 C. Pope, State of New Hampsire, SLO D. O'Brien, State of Vermont, SLO J. Giarrusso, SLO, MEMA, Commonwealth of Massachusetts U. Vanags, State Nuclear Engineer, Vermont Department of Public Service S. Shaw  


2 T. Sullivan Please contact me at 610-337-6967 with any questions you may have regarding this letter or the inspection plan.
2 T. Sullivan Please contact me at 610-337-6967 with any questions you may have regarding this letter or the inspection plan.
 
Sincerely,  
Sincerely, /RA/ Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects  
/RA/
 
Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-271 License No. DPR-28  
Docket Nos. 50-271 License No. DPR-28  


==Enclosures:==
==Enclosures:==
Vermont Yankee Nuclear Power Station Inspection/Activity Plans  
Vermont Yankee Nuclear Power Station Inspection/Activity Plans Distribution w/encl:
S. Collins, RA ROPreports@nrc.gov M. Dapas, DRA J. Trapp, DRS D. Lew, DRP J. Rogge, DRS J. Clifford, DRP M. Sykes, DRS R. Powell, DRP J. White, DRS B. Norris, DRP L. Doerflein, DRS N. Sieller, DRP R. Conte, DRS G. West, RI OEDO (Acting)
L. Scholl, DRS M. Kowal, NRR P. Frechette, DRS J. Lubinski, NRR D. Silk, DRS J. Kim, PM, NRR D. Screnci, PAO J. Boska, Backup PM, NRR N. Sheehan, PAO R. Fernandes, SRI R. Barkley, ORA B. Sienel, DRP, Resident Inspector D. Holody, ORA A. Rancourt, DRP, Resident OA ROPreports@nrc.gov RidsNrrDirslpab@nrc.gov Region I Docket Room (with concurrences)
J. Thompson, NRR (JWT1@nrc.gov)
SUNSI Review Complete: RJP (Reviewer=s Initials)
DOCUMENT NAME: T:\\DRP\\BRANCH5\\ROP 8 LETTERS\\VY_DEC_07.DOC After declaring this document AAn Official Agency Record@ it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E"
= Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME NSieller/NSS RPowell/RJP DATE 12/12/07 12/12/07 OFFICIAL RECORD COPY


Distribution w/encl: S. Collins, RA    ROPreports@nrc.gov M. Dapas, DRA    J. Trapp, DRS D. Lew, DRP    J. Rogge, DRS J. Clifford, DRP    M. Sykes, DRS R. Powell, DRP    J. White, DRS B. Norris, DRP    L. Doerflein, DRS N. Sieller, DRP    R. Conte, DRS G. West, RI OEDO (Acting)   L. Scholl, DRS M. Kowal, NRR    P. Frechette, DRS  J. Lubinski, NRR    D. Silk, DRS J. Kim, PM, NRR    D. Screnci, PAO J. Boska, Backup PM, NRR  N. Sheehan, PAO R. Fernandes, SRI    R. Barkley, ORA B. Sienel, DRP, Resident Inspector    D. Holody, ORA  A. Rancourt, DRP, Resident OA  ROPreports@nrc.gov RidsNrrDirslpab@nrc.gov  Region I Docket Room (with concurrences) J. Thompson, NRR (JWT1@nrc.gov)
Vermont Yankee Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 12/11/2007 14:33:33 Report 22 1
ISFSI
- ISFSI INSPECTION Other Routine 02/01/2008 03/21/2008 1
60854 IP Preoperational Testing Of An ISFSI Other Routine 02/01/2008 03/21/2008 1
60854.1 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating P Other Routine 02/01/2008 03/21/2008 1
60855 IP Operation Of An ISFSI Other Routine 02/01/2008 03/21/2008 1
60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants Other Routine 02/01/2008 03/21/2008 1
60856 IP Review of 10 CFR 72.212(b) Evaluations 1
71152
- PI&R SAMPLE - HPCI/RCIC FLOW OSCILLATION Baseline Inspections 03/17/2008 03/21/2008 1
71152-Reviews IP In-depth Reviews 3
7111111B
- L.O REQUAL INSPECTION Baseline Inspections 07/21/2008 07/25/2008 1
7111111B IP Licensed Operator Requalification Program Baseline Inspections 07/28/2008 08/01/2008 1
7111111B IP Licensed Operator Requalification Program 4
MODS
- MODS Baseline Inspections 05/19/2008 05/23/2008 1
7111117B IP Permanent Plant Modifications Baseline Inspections 06/02/2008 06/06/2008 1
7111117B IP Permanent Plant Modifications 1
71121
- OCC RAD SAFETY Baseline Inspections 05/19/2008 05/23/2008 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1
71121
- OCC RAD SAFETY Baseline Inspections 08/04/2008 08/08/2008 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 08/04/2008 08/08/2008 1
7112102 IP ALARA Planning and Controls 2
7111107B
- HEAT SINK Baseline Inspections 08/11/2008 08/15/2008 1
7111107B IP Heat Sink Performance 1
71122.02
- PUB RAD SAFETY - RADWASTE Baseline Inspections 10/06/2008 10/10/2008 1
7112202 IP Radioactive Material Processing and Transportation 1
EP
- EP PROGRAM INSPECTION EP Baseline Inspectio 10/05/2008 10/10/2008 1
7111402 IP Alert and Notification System Testing EP Baseline Inspectio 10/05/2008 10/10/2008 1
7111403 IP Emergency Response Organization Augmentation Testing EP Baseline Inspectio 10/05/2008 10/10/2008 1
7111404 IP Emergency Action Level and Emergency Plan Changes EP Baseline Inspectio 10/05/2008 10/10/2008 1
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 10/05/2008 10/10/2008 1
71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/05/2008 10/10/2008 1
71151-EP02 IP ERO Drill Participation Baseline Inspections 10/05/2008 10/10/2008 1
71151-EP03 IP Alert & Notification System 1
7111108
- INSERVICE INSPECTION Baseline Inspections 10/20/2008 10/24/2008 1
7111108G IP Inservice Inspection Activities - BWR 2
71121
- OCC RAD SAFETY Baseline Inspections 10/27/2008 10/31/2008 1
7112101 IP Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.


SUNSI Review Complete:    RJP      (Reviewer
Vermont Yankee Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 12/11/2007 14:33:33 Report 22 2
=s Initials)
71121
DOCUMENT NAME:  T:\DRP\BRANCH5\ROP 8 LETTERS\VY_DEC_07.DOC After declaring this document AAn Official Agency Record
- OCC RAD SAFETY Baseline Inspections 10/27/2008 10/31/2008 1
@ it will be released to the Public. To receive a copy of this document, indicate in the box: 
7112102 IP ALARA Planning and Controls Baseline Inspections 10/27/2008 10/31/2008 1
" C" = Copy without attachment/enclosure  " E" = Copy with attachment/enclosure  " N" = No copy OFFICE  RI/DRP      RI/DRP            NAME  NSieller/NSS RPowell/RJP
71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 10/27/2008 10/31/2008 1
 
71151-PR01 IP RETS/ODCM Radiological Effluent 1
DATE  12/12/07  12/12/07      OFFICIAL RECORD COPY
7112201
 
- PUB RAD SAFETY - RETS Baseline Inspections 12/01/2008 12/05/2008 1
Vermont Yankee Inspection / Activity Plan 01/01/2008
7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems This report does not include INPO and OUTAGE activities.
-12/31/2008 Inspection Type Inspection Activity Planned Dates Start           End No. of Staff on Site Title Unit Number Page 1 of 2 12/11/2007 14:33:33 Report 22 1 ISFSI-ISFSI INSPECTION Other Routine 02/01/2008 03/21/2008 1    60854 IP Preoperational Testing Of An ISFSI Other Routine 02/01/2008 03/21/2008 1    60854.1 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating P Other Routine 02/01/2008 03/21/2008 1    60855 IP Operation Of An ISFSI Other Routine 02/01/2008 03/21/2008 1    60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants Other Routine 02/01/2008 03/21/2008 1    60856 IP Review of 10 CFR 72.212(b) Evaluations 1 71152-PI&R SAMPLE - HPCI/RCIC FLOW OSCILLATION Baseline Inspections 03/17/2008 03/21/2008 1    71152-Reviews IP In-depth Reviews 3 7111111B-L.O REQUAL INSPECTION Baseline Inspections 07/21/2008 07/25/2008 1    7111111B IP Licensed Operator Requalification Program Baseline Inspections 07/28/2008 08/01/2008 1    7111111B IP Licensed Operator Requalification Program 4 MODS-MODS Baseline Inspections 05/19/2008 05/23/2008 1    7111117B IP Permanent Plant Modifications Baseline Inspections 06/02/2008 06/06/2008 1    7111117B IP Permanent Plant Modifications 1 71121-OCC RAD SAFETY Baseline Inspections 05/19/2008 05/23/2008 1    7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1 71121-OCC RAD SAFETY Baseline Inspections 08/04/2008 08/08/2008 1    7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 08/04/2008 08/08/2008 1    7112102 IP A LARA Planning and Controls 2 7111107B-HEAT SINK Baseline Inspections 08/11/2008 08/15/2008 1    7111107B IP Heat Sink Performance 1 71122.02-PUB RAD SAFETY - RADWASTE Baseline Inspections 10/06/2008 10/10/2008 1    7112202 IP Radioactive Material Processing and Transportation 1 EP-EP PROGRAM INSPECTION EP Baseline Inspecti o 10/05/2008 10/10/2008 1    7111402 IP A lert and Notification System Testing EP Baseline Inspecti o 10/05/2008 10/10/2008 1    7111403 IP Emergency Response Organization Augmentation Testing EP Baseline Inspecti o 10/05/2008 10/10/2008 1    7111404 IP Emergency Action Level and Emergency Plan Changes EP Baseline Inspecti o 10/05/2008 10/10/2008 1    7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 10/05/2008 10/10/2008 1    71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/05/2008 10/10/2008 1    71151-EP02 IP ERO Drill Participation Baseline Inspections 10/05/2008 10/10/2008 1    71151-EP03 IP A lert & Notification System 1 7111108-INSERVICE INSPECTION Baseline Inspections 10/20/2008 10/24/2008 1    7111108G IP Inservice Inspection Activities - BWR 2 71121-OCC RAD SAFETY Baseline Inspections 10/27/2008 10/31/2008 1     7112101 IP A ccess Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Vermont Yankee Inspection / Activity Plan 01/01/2008
-12/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 12/11/2007 14:33:33 Report 22 2 71121-OCC RAD SAFETY Baseline Inspections 10/27/2008 10/31/2008 1    7112102 IP A LARA Planning and Controls Baseline Inspections 10/27/2008 10/31/2008 1     71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 10/27/2008 10/31/2008 1     71151-PR01 IP RETS/ODCM Radiological Effluent 1 7112201-PUB RAD SAFETY - RETS Baseline Inspections 12/01/2008 12/05/2008 1     7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 19:31, 14 January 2025

ROP8 - Vermont Yankee - Change to Inspection Plan, 12/13/07
ML073470958
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 12/13/2007
From: Racquel Powell
NRC/RGN-I/DRP/PB5
To: Ted Sullivan
Entergy Nuclear Operations
powell, rj
References
Download: ML073470958 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406 December 13, 2007 Mr. Theodore A. Sullivan Site Vice President Entergy Nuclear Operations, Inc.

Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500

SUBJECT:

CHANGE TO THE INSPECTION PLAN - VERMONT YANKEE NUCLEAR POWER STATION

Dear Mr. Sullivan:

As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.

The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.

In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

T. Sullivan 2

Please contact me at 610-337-6967 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-271 License No. DPR-28

Enclosures:

Vermont Yankee Nuclear Power Station Inspection/Activity Plans cc w/encl:

M. R. Kansler, Chief Nuclear Officer and President, Entergy Nuclear Operations, Inc.

G. J. Taylor, Group President, Utility Operations J. Wayne Leonard, Chairman and Chief Executive Officer, Entergy Operations J. T. Herron, Senior Vice President, Entergy Nuclear Operations M. A. Balduzzi, Senior Vice President and Chief Operating Officer J. DeRoy, Vice President, Operations Support O. Limpias, Vice President, Engineering D. J. Mannai, Manager, Licensing, Vermont Yankee Nuclear Power Station E. Cota, Operating Experience Coordinator, Vermont Yankee Nuclear Power Station W. F. Maguire, General Manager, Plant Operations, Entergy Nuclear Operations, Inc.

N. L. Rademacher, Director, Engineering, Vermont Yankee Nuclear Power Station J. F. McCann, Director, Nuclear Safety and Licensing E. Harkness, Director of Oversight, Entergy Nuclear Operations, Inc.

Assistant General Counsel, Entergy Nuclear Operations, Inc.

J. H. Sniezek, PWR SRC Consultant M. D. Lyster, PWR SRC Consultant G. Edwards S. Lousteau, Treasury Department, Entergy Services, Inc.

D. O Dowd, Administrator, Radiological Health Section, DPHS, State of New Hampshire W. Irwin, Chief, CHP, Radiological Health, Vermont Department of Health Chief, Safety Unit, Office of the Attorney General, Commonwealth of Mass.

D. Lewis, Pillsbury, Winthrop, Shaw, Pittman LLP G. D. Bisbee, Esquire, Deputy Attorney General, Environmental Protection Bureau J. Block, Esquire J. P. Matteau, Executive Director, Windham Regional Commission D. Katz, Citizens Awareness Network (CAN)

R. Shadis, New England Coalition Staff G. Sachs, President/Staff Person, c/o Stopthesale J. Volz, Chairman, Public Service Board, State of Vermont Chairman, Board of Selectman, Town of Vernon

T. Sullivan 3

C. Pope, State of New Hampsire, SLO D. O'Brien, State of Vermont, SLO J. Giarrusso, SLO, MEMA, Commonwealth of Massachusetts U. Vanags, State Nuclear Engineer, Vermont Department of Public Service S. Shaw

2 T. Sullivan Please contact me at 610-337-6967 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-271 License No. DPR-28

Enclosures:

Vermont Yankee Nuclear Power Station Inspection/Activity Plans Distribution w/encl:

S. Collins, RA ROPreports@nrc.gov M. Dapas, DRA J. Trapp, DRS D. Lew, DRP J. Rogge, DRS J. Clifford, DRP M. Sykes, DRS R. Powell, DRP J. White, DRS B. Norris, DRP L. Doerflein, DRS N. Sieller, DRP R. Conte, DRS G. West, RI OEDO (Acting)

L. Scholl, DRS M. Kowal, NRR P. Frechette, DRS J. Lubinski, NRR D. Silk, DRS J. Kim, PM, NRR D. Screnci, PAO J. Boska, Backup PM, NRR N. Sheehan, PAO R. Fernandes, SRI R. Barkley, ORA B. Sienel, DRP, Resident Inspector D. Holody, ORA A. Rancourt, DRP, Resident OA ROPreports@nrc.gov RidsNrrDirslpab@nrc.gov Region I Docket Room (with concurrences)

J. Thompson, NRR (JWT1@nrc.gov)

SUNSI Review Complete: RJP (Reviewer=s Initials)

DOCUMENT NAME: T:\\DRP\\BRANCH5\\ROP 8 LETTERS\\VY_DEC_07.DOC After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E"

= Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME NSieller/NSS RPowell/RJP DATE 12/12/07 12/12/07 OFFICIAL RECORD COPY

Vermont Yankee Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 12/11/2007 14:33:33 Report 22 1

ISFSI

- ISFSI INSPECTION Other Routine 02/01/2008 03/21/2008 1

60854 IP Preoperational Testing Of An ISFSI Other Routine 02/01/2008 03/21/2008 1

60854.1 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating P Other Routine 02/01/2008 03/21/2008 1

60855 IP Operation Of An ISFSI Other Routine 02/01/2008 03/21/2008 1

60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants Other Routine 02/01/2008 03/21/2008 1

60856 IP Review of 10 CFR 72.212(b) Evaluations 1

71152

- PI&R SAMPLE - HPCI/RCIC FLOW OSCILLATION Baseline Inspections 03/17/2008 03/21/2008 1

71152-Reviews IP In-depth Reviews 3

7111111B

- L.O REQUAL INSPECTION Baseline Inspections 07/21/2008 07/25/2008 1

7111111B IP Licensed Operator Requalification Program Baseline Inspections 07/28/2008 08/01/2008 1

7111111B IP Licensed Operator Requalification Program 4

MODS

- MODS Baseline Inspections 05/19/2008 05/23/2008 1

7111117B IP Permanent Plant Modifications Baseline Inspections 06/02/2008 06/06/2008 1

7111117B IP Permanent Plant Modifications 1

71121

- OCC RAD SAFETY Baseline Inspections 05/19/2008 05/23/2008 1

7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1

71121

- OCC RAD SAFETY Baseline Inspections 08/04/2008 08/08/2008 1

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 08/04/2008 08/08/2008 1

7112102 IP ALARA Planning and Controls 2

7111107B

- HEAT SINK Baseline Inspections 08/11/2008 08/15/2008 1

7111107B IP Heat Sink Performance 1

71122.02

- PUB RAD SAFETY - RADWASTE Baseline Inspections 10/06/2008 10/10/2008 1

7112202 IP Radioactive Material Processing and Transportation 1

EP

- EP PROGRAM INSPECTION EP Baseline Inspectio 10/05/2008 10/10/2008 1

7111402 IP Alert and Notification System Testing EP Baseline Inspectio 10/05/2008 10/10/2008 1

7111403 IP Emergency Response Organization Augmentation Testing EP Baseline Inspectio 10/05/2008 10/10/2008 1

7111404 IP Emergency Action Level and Emergency Plan Changes EP Baseline Inspectio 10/05/2008 10/10/2008 1

7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 10/05/2008 10/10/2008 1

71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/05/2008 10/10/2008 1

71151-EP02 IP ERO Drill Participation Baseline Inspections 10/05/2008 10/10/2008 1

71151-EP03 IP Alert & Notification System 1

7111108

- INSERVICE INSPECTION Baseline Inspections 10/20/2008 10/24/2008 1

7111108G IP Inservice Inspection Activities - BWR 2

71121

- OCC RAD SAFETY Baseline Inspections 10/27/2008 10/31/2008 1

7112101 IP Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Vermont Yankee Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 12/11/2007 14:33:33 Report 22 2

71121

- OCC RAD SAFETY Baseline Inspections 10/27/2008 10/31/2008 1

7112102 IP ALARA Planning and Controls Baseline Inspections 10/27/2008 10/31/2008 1

71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 10/27/2008 10/31/2008 1

71151-PR01 IP RETS/ODCM Radiological Effluent 1

7112201

- PUB RAD SAFETY - RETS Baseline Inspections 12/01/2008 12/05/2008 1

7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.