{{#Wiki_filter: ; with copies to the Regional Administrator, Region l; the Director,Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident lnspector at FitzPatrick. ln accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter andits enclosure, and your response (if any) will be available electronically for public inspection inthe NRC Public Document Room or from the Publicly Available Records (PARS) component ofthe NRC's document system (ADAMS). ADAMS is accessible from the NRC Website athttp://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406.1415 November 8, zOLl Mr. Mike Colomb Site Vice President Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant P. O. Box 110 Lycoming, NY 13093


Sincerely,/st l //rurt ,/rl ^*7Mel Gray, Chief (Projects Branch 2Division of Reactor ProjectsDocket No.: 50-333License No.: DPR-59
SUBJECT: JAMES A. FITZPATRICK NUCLEAR POWER PLANT - NRC INTEGRATED I NSPECTION REPORT 05000333/201 1004
 
==Dear Mr. Colomb:==
On September 30, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your James A. FitzPatrick Nuclear Power Plant (FitzPatrick).
 
The enclosed inspection report documents the inspection results which were discussed on October 19, 2011, with Mr. Brian R. Sullivan and other members of your staff.The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
 
Based on the results of this inspection, no findings of significance were identified.
 
However, a licensee-identified violation which was determined to be of very low safety significance is listed in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section Vl.A.1 of the NRC Enforcement Policy because of the very low safety significance of the violation and because it is entered into your corrective action program. lf you contest this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis ior your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region l; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident lnspector at FitzPatrick. ln accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,/st l //rurt ,/rl ^*7 Mel Gray, Chief (Projects Branch 2 Division of Reactor Projects Docket No.: 50-333 License No.: DPR-59  


===Enclosure:===
===Enclosure:===
Line 26: Line 37:


===w/Attachment:===
===w/Attachment:===
Supplemental I nformationcc Mencl: Distribution via ListServ
Supplemental I nformation cc Mencl: Distribution via ListServ


=SUMMARY OF FINDINGS=
=SUMMARY OF FINDINGS=
lR 0500033312011004;07lQ112011 - 0913012011; James A. FitzPatrick Nuclear Power Plant;Routine Resident Integrated Report.The report covered a three-month period of inspection by resident inspectors and announcedinspections performed by regional inspectors. The NRC's program for overseeing the safeoperation of commercial nuclear power reactors is described in NUREG-1649, "ReactorOversight Process," Revision 4, dated December 2006,
lR 0500033312011004;07lQ112011 - 0913012011;  
 
James A. FitzPatrick Nuclear Power Plant;Routine Resident Integrated Report.The report covered a three-month period of inspection by resident inspectors and announced inspections performed by regional inspectors.
 
The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006,  


===Other Findings===
===Other Findings===
A violation of very low safety significance that was identified by Entergy personnel was reviewedby the inspectors. Corrective actions taken or planned by Entergy personnel have been enteredinto Entergy's corrective action program (CAP). This violation and corrective action trackingnumber are listed in Section 4OA7 of this report.Enclosure
A violation of very low safety significance that was identified by Entergy personnel was reviewed by the inspectors.


4
Corrective actions taken or planned by Entergy personnel have been entered into Entergy's corrective action program (CAP). This violation and corrective action tracking number are listed in Section 4OA7 of this report.Enclosure 4


=REPORT DETAILS=
=REPORT DETAILS=
Summarv of Plant StatusThe James A. FitzPatrick Nuclear Power Plant (FitzPatrick) began the inspection periodoperating at 100 percent reactor power. On September 28, 2011, power was reduced to 65percent to perform a control rod sequence exchange, single control rod scram time testing andblade interference monitoring, main condenser water box back washing, and turbine valvetesting. Operators restored power to 100 percent the following day. The plant continued tooperate at or near full power for the remainder of the inspection period.1. REACTORSAFETYGornerstones: lnitiating Events, Mitigating Systems, and Barrier lntegrity1R01 Adverse Weather Protection (71111.01 - 1 sample)a. lnspection ScopeThe inspectors reviewed FitzPatrick personnel's preparations in accordance with AOP-13, "High Winds, Hurricanes and Tornadoes," Revision 13, for potential high wind andheavy rain conditions associated with Hurricane lrene on August 28,2011. Theinspectors reviewed the operating status of the reactor, reviewed the procedural limitsand actions associated with high winds and hurricanes, and walked down accessibleareas of the reactor building (RB) and turbine building (TB) to assess vulnerabilities tohigh winds and heavy rains. Walkdowns were also conducted in the emergency dieselgenerator (EDG), emergency service water (ESW), and screenhouse rooms. Theinspectors reviewed conditions following the occurrence of the adverse weather toassess its impact. Documents reviewed for each section of this inspection report arelisted in the Attachment.These activities constituted one impending adverse weather conditions inspectionsample.b. FindinqsNo findings were identified.
Summarv of Plant Status The James A. FitzPatrick Nuclear Power Plant (FitzPatrick)began the inspection period operating at 100 percent reactor power. On September 28, 2011, power was reduced to 65 percent to perform a control rod sequence exchange, single control rod scram time testing and blade interference monitoring, main condenser water box back washing, and turbine valve testing. Operators restored power to 100 percent the following day. The plant continued to operate at or near full power for the remainder of the inspection period.1. REACTORSAFETY Gornerstones:
lnitiating Events, Mitigating Systems, and Barrier lntegrity 1R01 Adverse Weather Protection (71111.01 - 1 sample)a. lnspection Scope The inspectors reviewed FitzPatrick personnel's preparations in accordance with AOP-13, "High Winds, Hurricanes and Tornadoes," Revision 13, for potential high wind and heavy rain conditions associated with Hurricane lrene on August 28,2011. The inspectors reviewed the operating status of the reactor, reviewed the procedural limits and actions associated with high winds and hurricanes, and walked down accessible areas of the reactor building (RB) and turbine building (TB) to assess vulnerabilities to high winds and heavy rains. Walkdowns were also conducted in the emergency diesel generator (EDG), emergency service water (ESW), and screenhouse rooms. The inspectors reviewed conditions following the occurrence of the adverse weather to assess its impact. Documents reviewed for each section of this inspection report are listed in the Attachment.
 
These activities constituted one impending adverse weather conditions inspection sample.b. Findinqs No findings were identified.
{{a|1R04}}
{{a|1R04}}
==1R04 Equipment Aliqnment (71111.04)==
==1R04 Equipment==
.1 Quarterlv Partial Svstem Walkdown (71111.04Q - 3 samples)a. Inspection ScopeThe inspectors performed three partial system walkdowns to verify the operability ofredundant or diverse trains and components during periods of system train unavailabilityor following periods of maintenance. The inspectors referenced system procedures, theupdated final safety analysis report (UFSAR), and system drawings in order to verify thealignment of the available train was proper to support its required safety functions. TheiiEnclosure 5inspectors also reviewed applicable condition reports (CRs) and work orders (WOs) toensure that FitzPatrick personnel identified and properly addressed equipmentdiscrepancies that could impair the capability of the available equipment train, asrequired by Title 10, Code of Federal Regulations (10 CFR) 50, Appendix B, CriterionXVl, "Corrective Action." The inspectors performed a partial walkdown of the followingsystems:. 'A' residual heat removal (RHR) system when the'B' RHR system was out of servicefor testing;. Diesel engine driven fire pump 76P-1 upon completion of post maintenance testing(PMT); ando 'A' core spray system while the 'B' core spray system was out of service for testing.These activities constituted three partial system walkdown inspection samples.b. FindinqsNo findings were identified.
 
Aliqnment (71111.04)
 
===.1 Quarterlv===
 
Partial Svstem Walkdown (71111.04Q - 3 samples)a. Inspection Scope The inspectors performed three partial system walkdowns to verify the operability of redundant or diverse trains and components during periods of system train unavailability or following periods of maintenance.
 
The inspectors referenced system procedures, the updated final safety analysis report (UFSAR), and system drawings in order to verify the alignment of the available train was proper to support its required safety functions.
 
The i i Enclosure 5 inspectors also reviewed applicable condition reports (CRs) and work orders (WOs) to ensure that FitzPatrick personnel identified and properly addressed equipment discrepancies that could impair the capability of the available equipment train, as required by Title 10, Code of Federal Regulations (10 CFR) 50, Appendix B, Criterion XVl, "Corrective Action." The inspectors performed a partial walkdown of the following systems:. 'A' residual heat removal (RHR) system when the'B' RHR system was out of service for testing;. Diesel engine driven fire pump 76P-1 upon completion of post maintenance testing (PMT); and o 'A' core spray system while the 'B' core spray system was out of service for testing.These activities constituted three partial system walkdown inspection samples.b. Findinqs No findings were identified.
{{a|1R05}}
{{a|1R05}}
==1R05 Fire Protection (71111.05)==
==1R05 Fire Protection==
.1 Quarterlv Review (71111.05Q - 5 samples)a. Inspection ScopeThe inspectors conducted inspections of fire areas to assess the material condition andoperational status of fire protection features. The inspectors verified, consistentwithapplicable administrative procedures, that combustibles and ignition sources wereadequately controlled; passive fire barriers, manual fire-fighting equipment, andsuppression and detection equipment were appropriately maintained; and compensatorymeasures for out-of-service, degraded, or inoperable fire protection equipment wereimplemented in accordance with FitzPatrick's fire protection program. The inspectorsevaluated the fire protection program for conformance with the requirements of licensecondition 2.C(3), "Fire Protection."o East switchgear room, fire arealzone ll/SW-2;o West switchgear room, fire arealzone lClSW-1;. 'A' and 'C' EDG rooms and switchgear room, fire arealzone V/EG-1 , EG-2, EG-5;. East crescent area, fire arealzone XVll/RB-1 E; andr North safety related pump room, fire arealzone Xltl/SP-2.These activities constituted five quarterly fire protection inspection samples.b. FindinosNo findings were identified.Enclosure 61R06 Flood Protection Measures (71111.06 - 1 sample)a. lnspection ScopeThe inspectors examined manhole MH-7A in the 115 kilovolt (kV) switchyard, and MH-5A by main transformer T1A, during FitzPatrick personnel's annual inspection of yardmanholes performed under WO 52285065-01. These manholes contain non-safetyclass electrical cables that could affect the reliability of 1 15 kV offsite power. Theinspectors also examined the condensate storage tank (CST) pit, which contains safetyclass instrument cables. The inspectors verified that cable insulation was not degradedand that cable support structures were adequate to maintain the integrity of the cables.The inspectors observed that the manholes were equipped with floatactuated sumppumps, but that there were no level indicators or alarms to alert operators to a pumpfailure. The inspectors noted that CR-JAF-2011-04407 documented sump pump issuesthat had been identified during the annual inspection, including excessive wateraccumulation in one manhole due to a stuck float actuator, and a failed sump pump inMH-7A. These conditions did not constitute violations of regulatory requirementsbecause the affected manholes did not contain safety class electrical cables. Theinspectors also noted that the CST pit is checked during daily operator rounds andtherefore that the safety related cables were not likely to become submerged due tosimilar sump float issues.These activities constituted one underground bunker/manhole inspection sample.b. FindinqsNo findings were identified.
 
(71111.05)
 
===.1 Quarterlv===
 
Review (71111.05Q - 5 samples)a. Inspection Scope The inspectors conducted inspections of fire areas to assess the material condition and operational status of fire protection features.
 
The inspectors verified, consistentwith applicable administrative procedures, that combustibles and ignition sources were adequately controlled; passive fire barriers, manual fire-fighting equipment, and suppression and detection equipment were appropriately maintained; and compensatory measures for out-of-service, degraded, or inoperable fire protection equipment were implemented in accordance with FitzPatrick's fire protection program. The inspectors evaluated the fire protection program for conformance with the requirements of license condition 2.C(3), "Fire Protection." o East switchgear room, fire arealzone ll/SW-2;o West switchgear room, fire arealzone lClSW-1;. 'A' and 'C' EDG rooms and switchgear room, fire arealzone V/EG-1 , EG-2, EG-5;. East crescent area, fire arealzone XVll/RB-1 E; and r North safety related pump room, fire arealzone Xltl/SP-2.
 
These activities constituted five quarterly fire protection inspection samples.b. Findinos No findings were identified.
 
6 1R06 Flood Protection Measures (71111.06 - 1 sample)a. lnspection Scope The inspectors examined manhole MH-7A in the 115 kilovolt (kV) switchyard, and MH-5A by main transformer T1A, during FitzPatrick personnel's annual inspection of yard manholes performed under WO 52285065-01.
 
These manholes contain non-safety class electrical cables that could affect the reliability of 1 15 kV offsite power. The inspectors also examined the condensate storage tank (CST) pit, which contains safety class instrument cables. The inspectors verified that cable insulation was not degraded and that cable support structures were adequate to maintain the integrity of the cables.The inspectors observed that the manholes were equipped with floatactuated sump pumps, but that there were no level indicators or alarms to alert operators to a pump failure. The inspectors noted that CR-JAF-2011-04407 documented sump pump issues that had been identified during the annual inspection, including excessive water accumulation in one manhole due to a stuck float actuator, and a failed sump pump in MH-7A. These conditions did not constitute violations of regulatory requirements because the affected manholes did not contain safety class electrical cables. The inspectors also noted that the CST pit is checked during daily operator rounds and therefore that the safety related cables were not likely to become submerged due to similar sump float issues.These activities constituted one underground bunker/manhole inspection sample.b. Findinqs No findings were identified.
{{a|1R07}}
{{a|1R07}}
==1R07 Heat Sink Performance (71111.Q7 - 1 sample)a. Inspection ScopeThe inspectors reviewed the ESW system annual thermal performance test that wasperformed on April 27,2011 in accordance with ST-8Q, "Testing of the EmergencyService Water System (lST)," Revision 41. This test determines the maximum laketemperature at which individual unit coolers in the east and west electric bays, and eastand west crescents, can be considered operable. Results that are less than the TSmaximum allowable service water inlet temperature of 85 degrees Fahrenheit ('F) limitthe plant's ability to operate under conditions of elevated lake temperature until the unitcooler degradation is corrected. The inspectors noted that the operability of one unitcooler, 67UC-168, was limited to 84'F service water inlet temperature. The inspectorsverified that actual lake temperature had not exceeded this value during the summerseason.These activities constituted one heat sink performance inspection sample.b. FindinqsNo findings were identified.Enclosure==
==1R07 Heat Sink Performance==
 
(71111.Q7 - 1 sample)a. Inspection Scope The inspectors reviewed the ESW system annual thermal performance test that was performed on April 27,2011 in accordance with ST-8Q, "Testing of the Emergency Service Water System (lST)," Revision 41. This test determines the maximum lake temperature at which individual unit coolers in the east and west electric bays, and east and west crescents, can be considered operable.
 
Results that are less than the TS maximum allowable service water inlet temperature of 85 degrees Fahrenheit  
('F) limit the plant's ability to operate under conditions of elevated lake temperature until the unit cooler degradation is corrected.
 
The inspectors noted that the operability of one unit cooler, 67UC-168, was limited to 84'F service water inlet temperature.
 
The inspectors verified that actual lake temperature had not exceeded this value during the summer season.These activities constituted one heat sink performance inspection sample.b. Findinqs No findings were identified.
 
7 1R1 1 Licensed Operator Requalification Proqram (71111.11Q - 1 sample)a. Inspection Scope On September 12, 2011, the inspectors observed licensed operator simulator training to assess operator performance during a scenario to verify that crew performance was adequate and evaluators were identifying and documenting crew performance problems.The inspectors evaluated the performance of risk significant operator actions, including the use of emergency operating procedures.


71R1 1 Licensed Operator Requalification Proqram (71111.11Q - 1 sample)a. Inspection ScopeOn September 12, 2011, the inspectors observed licensed operator simulator training toassess operator performance during a scenario to verify that crew performance wasadequate and evaluators were identifying and documenting crew performance problems.The inspectors evaluated the performance of risk significant operator actions, includingthe use of emergency operating procedures. The inspectors assessed the clarity andeffectiveness of communications, the implementation of appropriate actions in responseto alarms, the performance of timely control board operation and manipulation, and theoversight and direction provided by the shift manager. Licensed operator training wasevaluated for conformance with the requirements of 10 CFR Part 55, "Operators'Licenses."These activities constituted one quarterly operator simulator training inspection sample.b. FindinqsNo findings were identified.
The inspectors assessed the clarity and effectiveness of communications, the implementation of appropriate actions in response to alarms, the performance of timely control board operation and manipulation, and the oversight and direction provided by the shift manager. Licensed operator training was evaluated for conformance with the requirements of 10 CFR Part 55, "Operators' Licenses." These activities constituted one quarterly operator simulator training inspection sample.b. Findinqs No findings were identified.
{{a|1R12}}
{{a|1R12}}
==1R12 Maintenance Effectiveness (71111J2Q - 3 samples)lnspection ScopeThe inspectors reviewed performance-based problems involving selected in-scopestructures, systems, or components (SSCs) to assess the effectiveness of themaintenance program. The reviews focused on the following aspects when applicable:r Proper maintenance rule scoping in accordance with 10 CFR Part 50.65;. Characterization of reliability issues;. Changing system and component unavailability;. 10 CFR 50.65 (aX1) and (a)(2) classifications;. ldentifying and addressing common cause failures;. Appropriateness of performance criteria for SSCs classified (aX2); and. Adequacy of goals and corrective actions for SSCs classified (aX1).The inspectors reviewed system health reports, maintenance backlogs, andMaintenance Rule basis documents. The documents reviewed are listed in theAttachment. The following systems were selected for review.o Control rod drive hydraulic system;. ESW system; and. Standby liquid control (SLC) system.These activities constituted three quarterly maintenance effectiveness inspectionsamples.Enclosure==
==1R12 Maintenance==
 
Effectiveness (71111J2Q - 3 samples)lnspection Scope The inspectors reviewed performance-based problems involving selected in-scope structures, systems, or components (SSCs) to assess the effectiveness of the maintenance program. The reviews focused on the following aspects when applicable:
r Proper maintenance rule scoping in accordance with 10 CFR Part 50.65;. Characterization of reliability issues;. Changing system and component unavailability;. 10 CFR 50.65 (aX1) and (a)(2) classifications;. ldentifying and addressing common cause failures;. Appropriateness of performance criteria for SSCs classified (aX2); and. Adequacy of goals and corrective actions for SSCs classified (aX1).The inspectors reviewed system health reports, maintenance backlogs, and Maintenance Rule basis documents.


b. FindinqsNo findings were identified.
The documents reviewed are listed in the Attachment.
 
The following systems were selected for review.o Control rod drive hydraulic system;. ESW system; and. Standby liquid control (SLC) system.These activities constituted three quarterly maintenance effectiveness inspection samples.Enclosure b. Findinqs No findings were identified.
{{a|1R13}}
{{a|1R13}}
==1R13 Maintenance Risk Assessments and Emeroent Work Control (71111==
==1R13 Maintenance==
 
Risk Assessments and Emeroent Work Control (71111
 
===.13 - 5 samples)a. Inspection===
 
Scope The inspectors reviewed maintenance activities to verify that the appropriate risk assessments were performed prior to removing equipment for work. The inspectors reviewed whether risk assessments were performed as required by 10 CFR 50.65(a)(4), and were accurate and complete.
 
When emergent work was performed, the inspectors reviewed whether plant risk was promptly reassessed and managed. The documents reviewed are listed in the Attachment.


===.13 - 5 samples)a. Inspection ScopeThe inspectors reviewed maintenance activities to verify that the appropriate riskassessments were performed prior to removing equipment for work. The inspectorsreviewed whether risk assessments were performed as required by 10 CFR 50.65(a)(4),and were accurate and complete. When emergent work was performed, the inspectorsreviewed whether plant risk was promptly reassessed and managed. The documentsreviewed are listed in the Attachment. The reviews focused on the following activities:The week of August 15, that included 'A' and 'C' EDG monthly surveillance test,division 1 anticipated transient without scram (ATWS) pressure instrument quarterlysurveillance test, 'A' SLC system quarterly function test, 'A' core spray quarterlysurveillance test, and emergent maintenance to identify and repair a leak in the westdieselfire pump cooling system.The week of August 29, that included 'B' and 'D' EDG monthly surveillance test,division 2 ATWS pressure instrument quarterly surveillance test, 'B' SLC systemquarterly function test, 'B' core spray quarterly surveillance test, and emergentmaintenance to replace the 'B' core spray hold pump discharge check valve.The week of September 5, that included a one day maintenance outage for outgoing345 kV line 1, planned maintenance on the 'B' reactor protection system (RPS)motor-generator, testing of the 'B' RPS electrical protection assemblies, 'B' averagepower range monitor system flow bias channelfunctional test, torus-to-drywellvacuum breaker operability test, main steam isolation valve limit switch instrumentquarterly surveillance test, and emergent maintenance to replace the 'B' core sprayhold pump seal.The week of September 19, that included reactor core isolation cooling (RCIC)system instrumentation and pump quarterly surveillance tests, replacement of the 'A'electro-hydraulic control pump, a one day maintenance period for the 'A' RHRservice water system, and emergent maintenance to troubleshoot a speed indicationproblem with the 'A' reactor water recirculation pump, troubleshoot a startup transientspeed/pressure issue with the RCIC pump, and replace the local frequency meter forthe'A'EDG.The week of September 26, that included high pressure coolant injection systemquarterly surveillance test, 'B'and 'D' EDG monthly surveillance test, a plannedpower reduction to 65 percent for a control rod sequence exchange, single controlrod scram time testing and blade interference monitoring, backwashing maincondenser water boxes, and main turbine valve testing, 'B' RHR quarterlysurveillance test to perform increased frequency vibration monitoring.Enclosure===
The reviews focused on the following activities:
The week of August 15, that included 'A' and 'C' EDG monthly surveillance test, division 1 anticipated transient without scram (ATWS) pressure instrument quarterly surveillance test, 'A' SLC system quarterly function test, 'A' core spray quarterly surveillance test, and emergent maintenance to identify and repair a leak in the west dieselfire pump cooling system.The week of August 29, that included 'B' and 'D' EDG monthly surveillance test, division 2 ATWS pressure instrument quarterly surveillance test, 'B' SLC system quarterly function test, 'B' core spray quarterly surveillance test, and emergent maintenance to replace the 'B' core spray hold pump discharge check valve.The week of September 5, that included a one day maintenance outage for outgoing 345 kV line 1, planned maintenance on the 'B' reactor protection system (RPS)motor-generator, testing of the 'B' RPS electrical protection assemblies, 'B' average power range monitor system flow bias channelfunctional test, torus-to-drywell vacuum breaker operability test, main steam isolation valve limit switch instrument quarterly surveillance test, and emergent maintenance to replace the 'B' core spray hold pump seal.The week of September 19, that included reactor core isolation cooling (RCIC)system instrumentation and pump quarterly surveillance tests, replacement of the 'A'electro-hydraulic control pump, a one day maintenance period for the 'A' RHR service water system, and emergent maintenance to troubleshoot a speed indication problem with the 'A' reactor water recirculation pump, troubleshoot a startup transient speed/pressure issue with the RCIC pump, and replace the local frequency meter for the'A'EDG.


IThese activities constituted five maintenance risk assessments and emergent workcontrol inspection samples.b. FindinqsNo findings were identified.
The week of September 26, that included high pressure coolant injection system quarterly surveillance test, 'B'and 'D' EDG monthly surveillance test, a planned power reduction to 65 percent for a control rod sequence exchange, single control rod scram time testing and blade interference monitoring, backwashing main condenser water boxes, and main turbine valve testing, 'B' RHR quarterly surveillance test to perform increased frequency vibration monitoring.
 
I These activities constituted five maintenance risk assessments and emergent work control inspection samples.b. Findinqs No findings were identified.
{{a|1R15}}
{{a|1R15}}
==1R15 Operabilitv Evaluations (71111.15 - 5 samples)a. Inspection ScopeThe inspectors reviewed operability determinations to assess the acceptability of theevaluations; the use and control of applicable compensatory measures; and compliancewith technical specifications (TSs). The inspectors' reviews included verification that theoperability determinations were conducted as specified by EN-OP-104, "OperabilityDetermination Process." The technical adequacy of the determinations was reviewedand compared to the TSs, UFSAR, and associated design basis documents (DBDs).The inspection focused on the following operability reviews:CR-JAF-201 1-03517 concerning the effect of inaccurate period meter indication on'A' source range monitor operability;CR-JAF-2011-04281concerning RPS relay time response testing and the criteria fortesting RPS relay 05A-K101C, reactor pressure instrument;CR-JAF-2011-04411 concerning continued operability of the 'B' core spray systemwhile its hold (keep full) pump was isolated due to reverse leakage through thedischarge check valve and the keep full function was being performed by thecondensate transfer system ;. CR-JAF-2011-04457 concerning continued operability of four control rods afterreceiving notification that the vendor's revised channelfriction metric indicated thatthese control rods may experience degraded performance during insertion; and. CR-JAF-2011-04774 concerning continued operability of the RCIC system with adegraded check valve in the test return line to the CST.These activities constituted five operability evaluation inspection samples.b. FindinqsNo findings were identified.1R18 Plant Modifications (71111.18 - 2 samples)a. lnspection ScopeThe inspectors assessed the adequacy of the 10 CFR 50.59 evaluations for the followingpermanent and temporary modifications respectively. The inspectors' reviewsconsidered whether the installations were consistent with the modificationdocumentation, that the drawings and procedures were updated as applicable, and thatthe post-installation testing was adequate. The following reviews represented onepermanent modification inspection sample and one temporary modification inspectionsample:Enclosure==
==1R15 Operabilitv==
 
Evaluations (71111.15 - 5 samples)a. Inspection Scope The inspectors reviewed operability determinations to assess the acceptability of the evaluations; the use and control of applicable compensatory measures; and compliance with technical specifications (TSs). The inspectors' reviews included verification that the operability determinations were conducted as specified by EN-OP-104, "Operability Determination Process." The technical adequacy of the determinations was reviewed and compared to the TSs, UFSAR, and associated design basis documents (DBDs).The inspection focused on the following operability reviews: CR-JAF-201 1-03517 concerning the effect of inaccurate period meter indication on'A' source range monitor operability; CR-JAF-2011-04281concerning RPS relay time response testing and the criteria for testing RPS relay 05A-K101C, reactor pressure instrument; CR-JAF-2011-04411 concerning continued operability of the 'B' core spray system while its hold (keep full) pump was isolated due to reverse leakage through the discharge check valve and the keep full function was being performed by the condensate transfer system ;. CR-JAF-2011-04457 concerning continued operability of four control rods after receiving notification that the vendor's revised channelfriction metric indicated that these control rods may experience degraded performance during insertion; and. CR-JAF-2011-04774 concerning continued operability of the RCIC system with a degraded check valve in the test return line to the CST.These activities constituted five operability evaluation inspection samples.b. Findinqs No findings were identified.
{{a|1R18}}
==1R18 Plant Modifications==
 
(71111.18 - 2 samples)a. lnspection Scope The inspectors assessed the adequacy of the 10 CFR 50.59 evaluations for the following permanent and temporary modifications respectively.
 
The inspectors' reviews considered whether the installations were consistent with the modification documentation, that the drawings and procedures were updated as applicable, and that the post-installation testing was adequate.
 
The following reviews represented one permanent modification inspection sample and one temporary modification inspection sample: Enclosure 10 Permanent modification of the RPS to support RPS test box usage during surveillance testing, thereby preventing initiation of actual half scrams due to testing, performed in accordance with Engineering Change (EC) 15347, "lnstall Pomana Type Test Jacks in Panels 09-15, 09-17 for RPS Test Box Use;" and Temporary modification of the 'A' and 'B' reactor water recirculation motor-generators that recalibrated the tachometer generator voltage regulator circuits to produce a lower voltageto-speed response, performed in accordance with EC 25477 and EC 25480, "Recirc Tach Generator 02-184P-1A/B(TACH)115V Output Acceptance." b.Findinqs No findings were identified.
 
1 R19 Post-Maintenance Testinq (PMT) (71 1 1 1
 
===.19 - 6 samples)a.Inspection===
 
Scope The inspectors reviewed post-maintenance test procedures and associated testing activities for selected risk-significant mitigating systems to assess whether the effect of maintenance on plant systems was adequately addressed by control room and engineering personnel.
 
The inspectors verified whether test acceptance criteria were clear, demonstrated operational readiness, and were consistent with DBDs; test instrumentation had current calibrations, adequate range, and accuracy for the application; and tests were performed, as written, with applicable prerequisites satisfied.
 
Upon completion, the inspectors verified whether equipment was returned to the proper alignment necessary to perform its safety function.
 
PMT was evaluated for conformance with the requirements of 10 CFR Part 50, Appendix B, Criterion Xl, "Test Control." The documents reviewed are listed in the Attachment.
 
PMT activities associated with the following WOs were reviewed:. WO 00228000, preventive maintenance on the'A' standby gas treatment (SGT)system;. WO 5203502A, preventive maintenance replacement of 05A-K128D, an RPS relay for annunciator 09-5-2-60; o WO 29026203, replacement of 'A' EDG local frequency meter;. WO 52222339, RPS reactor pressure instrument response time testing of 05A-K101C;. WO 23477801, rebuild core spray'B'hold pump; and. WO 52038354, replacement of RCIC low steam pressure master trip unit, 13MTU-287C.These activities constituted six PMT inspection samples.Findinqs No findings were identified.
 
b.Enclosure 11 1R22 Surveillance Testinq (71111.22 - 7 samples)a. Insoection Scope The inspectors witnessed performance of surveillance tests (STs) and/or reviewed test data of selected risk-significant SSCs to assess whether the SSCs satisfied TSs, UFSAR, technical requirements manual, and station procedure requirements.
 
The inspectors reviewed whether test acceptance criteria were clear, demonstrated operational readiness, and were consistent with DBDs; test instrumentation had current calibrations, adequate range, and accuracy for the application; and tests were performed, as written, with applicable prerequisites satisfied.
 
Upon ST completion, the inspectors verified that equipment was returned to the status specified to perform its safety function.
 
The following STs were reviewed:. ST-2AL, "RHR Loop A Quarterly Operability Test (lST)," Revision 31;. ST-2XA, "RHR service Water Loop A Quarterly Operability Test (lST)," Revision 13;. ST-2AM, "RHR Loop B Quarterly Operability Test (lST)," Revision 31;. ST-24J, "RCIC Flow Rate and Inservice Test (lST),' Revision 41;. ISP-10OD-RPS, "RPS Instrument Functional TesUCalibration (ATTS)," Revision 37;. ST-3PB, "Core Spray Loop B Quarterly Operability," Revision 21; and o ISP-16, "Drywell Floor Drain Sump Flow Loop FunctionalTesUCalibration*," Revision 36.These activities represented seven surveillance testing inspection samples.b. Findinos No findings were identified.
 
===2. RADIATION ===
 
SAFETY Cornerstone:
Occupational Radiation Safety and Public Radiation Safety
{{a|2RS1}}
==2RS1 Radioloqical==
 
Hazard Assessment and Exposure Controls (71124.01-1 sample)a. Inspection Scope The inspectors reviewed the performance indicators for the Radiation Cornerstone, recent operational occurrences and the latest quality assurance audit of the Radiation Protection program.Radioloqical Hazard Assessment The inspectors reviewed changes to plant operations that may result in a significant new radiological hazard for onsite workers or members of the public since the last inspection.
 
The inspectors verified that FitzPatrick staff have assessed the potential impact of these changes and has implemented periodic monitoring, as appropriate, to detect and q uantify the rad iolo gical hazard.Recent radiological surveys from more than six plant areas were reviewed by the Enclosure 12 inspectors to evaluate the thoroughness and frequency of the surveys and that they were appropriate based on the radiological hazards.The inspectors conducted walkdowns and performed independent radiation surveys of the facility, including radioactive waste processing, storage, and handling areas, to evaluate the existing radiological conditions and the efficacy of the associated radiological postings and controls.The inspectors observed and evaluated the following radiological risk-significant work activity:
Placement of a shield lid on top of a loaded on-site storage container in the radwaste truck bay (a transient locked high radiation area (HRA)).With respect to the above work activity, the inspectors verified that appropriate prework surveys were performed and were sufficient to identify and quantify the radiological hazards and to establish adequate protective measures.
 
In addition, the inspectors reviewed applicable radiological surveys associated with this work activity to determine if hazards were properly identified, including the following:
identification of hot particles, the presence of alpha emitters, the potentialfor airborne radioactive materials, the hazards associated with work activities that could negatively affect the radiological conditions, and any significant radiation field dose gradients that could result in nonuniform exposures of the body. The inspectors selected at least five air sample survey records during 2011 and verified that the samples were collected and counted in accordance with FitzPatrick procedures.
 
The inspectors observed work in potential airborne areas to evaluate if applicable air monitoring was representative of the breathing air zone of the workers. The inspectors also reviewed the use of continuous air monitors to monitor real-time airborne conditions in accordance with FitzPatrick procedures.
 
The inspectors verified that FitzPatrick's program for monitoring loose surface contamination in areas of the plant was adequate to assess the potential for airborne contamination conditions.
 
Instructions to Workers The inspectors observed various radioactive material containers and verified that they were labeled and controlled in accordance with 10 CFR Parl2Q requirements.
 
Radiation work permits (RWPs) associated with the radiological risk-significant work activities listed above were evaluated by the inspectors to identify what work control instructions or control barriers were specified and that plant-specific technical specification HRA requirements were met, including the use of applicable electronic personal dosimeter alarm setpoints that were specified in conformance with survey indications and plant policy.The inspectors reviewed one electronic personal dosimeter dose rate alarm occurrence that was documented in a CR. The inspectors verified that FitzPatrick staff responded appropriately to the occurrence and that corrective actions and dose evaluations were adequate.Enclosure 13 Contamination and Radioactive Material Control The inspectors conducted observations at the main radiological controlled area egress location to observe the performance of personnel surveying and releasing material for unrestricted use to verify that those activities were performed in accordance with plant procedures and the procedures were sufficient to control the spread of contamination and prevent unintended release of radioactive materials from the site.The inspectors reviewed FitzPatrick's criteria for the survey and release of potentially contaminated material and verified that the radiation detection instrumentation was being used at its most effective sensitivity capability.
 
The inspectors selected three sealed sources from FitzPatrick's inventory records and verified that the required semi-annual leak tests were performed.
 
The inspectors verified that there have been no changes in the inventory of sources currently listed in the National Source Tracking System.Radioloqical Hazards Control and Work Coveraqe During tours of the facility and review of the work activity listed above, the inspectors evaluated the ambient radiological conditions and verified that existing conditions were consistent with posted surveys, RWPs, and worker briefings, as applicable.
 
During these work activity performance observations, the inspectors verified the adequacy of radiological controls, such as required surveys (including system breach radiation, contamination, and airborne surveys), radiation protection job coverage (including audio and visual surveillance for remote job coverage), contamination controls, and means of using electronic personal dosimeters in high noise areas as HRA monitoring devices.The inspectors verified that radiation monitoring devices were placed on the individual's body appropriately to monitor dose from external radiation sources. This review included high-radiation work areas with significant dose rate gradients.
 
The inspectors reviewed two RWPs for work within potential airborne radioactivity areas with the potential for individual worker internal exposures.
 
The inspectors evaluated the airborne radioactivity controls and monitoring, including potentials for significant airborne radioactivity levels (e.g., grinding, grit blasting, system breaches, entry into tanks, cubicles, reactor cavities).
 
For these selected potential airborne radioactive areas, the inspectors verified the appropriate use of high-efficiency particulate air ventilation system operation.
 
The inspectors examined the station's physical and programmatic controls for highly activated or contaminated materials (nonfuel)stored within the spent fuel pool and verified that appropriate controls were in place to preclude inadvertent removal of these materials from the pool.Tours within the radiological controlled area were conducted by the inspectors to evaluate radiological postings and physical controls for HRAs and very high radiation areas (VHRAs) with respect to regulatory requirements.
 
14 Risk-Siqnificant Hiqh Radiation Area and Verv Hiqh Radiation Area Controls The inspectors discussed with the radiation protection manager and one first-line health physics supervisor, the controls and procedures for high-risk HRAs and VHRAs and actions to be taken during changing plant conditions.
 
b.Radiation Worker Performance During observation of the work activity listed above, the inspectors observed radiation worker performance with respect to applicable radiation protection work requirements to determine if workers were aware of the significant radiological conditions in their workplace and their work performance was within the RWP control/limit requirements specified for the work performed.
 
The inspectors reviewed several radiological problem reports since the last inspection that identified the cause of the event to be human performance errors to determine if there was an observable pattern traceable to a similar cause and if this perspective matched the corrective action approach taken by station personnelto resolve the reported problems.Radiation Protection Technician Proficiencv During observation of the work activity listed above, the inspectors evaluated the performance of radiation protection technicians with respect to radiation protection work requirements and determined that technicians were aware of the radiological conditions in their workplace and that the RWP controls/limits and their performance was consistent with their training and qualifications with respect to the radiological hazards and work activities.
 
The inspectors reviewed several radiological problem reports since the last inspection that identified the cause of the event to be radiation protection technician error to determine if there was an observable pattern traceable to a similar cause and if this perspective matched the corrective action approach taken by FitzPatrick staff to resolve the reported problems.Problem ldentification and Resolution The inspectors verified that problems associated with radiation monitoring and exposure control were being identified by FitzPatrick personnel at an appropriate threshold and were properly addressed for resolution in the corrective action program (CAP).Findinqs No findings were identified.
 
Occupational Dose Assessment (7 1 124.04)2RS4
 
====a. Inspection Scope====
The inspectors reviewed the most recent National Voluntary Laboratory Accreditation Program (NVLAP) accreditation report on FitzPatrick.
 
15 The inspectors verified that FitzPatdck's personnel dosimeters that require processing were NVLAP accredited.
 
The inspectors verified the vendor's NVLAP accreditation.
 
The inspector ensured that the approved irradiation test categories for each type of personnel dosimeter used were consistent with the types and energies of the radiation present, and how the dosimeter was being used.The inspectors verified that FitzPatrick informed workers, as appropriate, of the risks of radiation exposure to the embryo/fetus, the regulatory aspects of declaring a pregnancy, and the specific process to be used for (voluntarily)declaring a pregnancy.
 
The inspectors selected individuals who had declared their pregnancy during the current assessment period, and verified that FitzPatrick's radiological monitoring program for declared pregnant workers was technically adequate to assess the dose to the embryo/fetus.
 
The inspectors reviewed the exposure results and monitoring controls employed by FitzPatrick and with respect to the requirements of 10 CFR Part 20. Two workers had declared pregnancies in the past 12 months.b. Findinos No findings were identified.
 
{{a|2RS5}}
==2RS5 Radiation==
 
Monitorinq lnstrumentation (71124.05)
Inspection Scope During the period July 18 through 22,2011, the inspectors conducted the following activities to verify that FitzPatrick personnel were providing accurate and operable radiation monitoring instruments used to 1) monitor areas, materials, and workers to ensure a radiologically safe work environment, and 2) detect and quantify radioactive process streams and effluent releases.
 
lmplementation of these controls was reviewed against the criteria contained in 10 CFR Part 20, relevant TSs, and FitzPatrick's procedures.
 
r The inspectors reviewed the UFSAR to identify applicable radiation monitors associated with transient high and VHRAs including those used in remote emergency assessment.
 
r The inspectors obtained a list of in-service survey instrumentation including air samplers, neutron survey instruments, personnel and small article monitors.
 
The inspectors reviewed the list to determine if an adequate number of instruments were available to support operations.
 
o The inspectors reviewed two FitzPatrick self-assessments for contamination and radioactive material control and radiation protection instrumentation and protective equipment.
 
r The inspectors reviewed source check and calibration procedures for the radiation monitoring instruments.. The inspectors reviewed alarm set-points for area radiation monitors and the basis for the set-points.
 
o The inspectors reviewed the alarm sefpoints and basis for effluent monitors and the methods used to calculate the set-points.
 
16 Walkdowns and Observations o The inspectors walked down the following radiation monitors: a) 17-04-1 drywell monitor'A';
b) 17-04-2 drywell monitor'B';
c) 17-RM-150'A'/'B' steam jet air ejector(SJAE)off-gas;d) 17RM-461 TB exhaust;e) 17RM-351 service water;f) 17RM-350 liquid radwaste effluent monitor; and g) 17RM-456 refuelfloor exhaust;. The inspectors verified that configuration of the monitors aligned with the Offsite Dose Calculation Manual (ODCM) descriptions.
 
The inspectors looked for monitor degradation and out of service tags.o The inspectors verified the calibration and source checkof 10 portable survey instruments and observed their material condition.
 
o The inspectors observed source checks of portable survey instruments.. The inspectors walked down eight area radiation monitors and verified the readout with a portable survey instrument.
 
r The inspectors verified periodic source checks were performed for two personnel monitors and two small article monitors.Calibration and Testinq Prooram. The inspectors verified for three effluent monitor instruments that channel calibration and functional tests were performed consistent with TSs and the ODCM. The inspectors also verified that the monitors were calibrated with National Institute of Standards and Technology (NIST) traceable sources that represent the plant nuclide mix.o The inspectors verified that the effluent monitor alarm set-points were established at or below the ODCM limits.Laboratorv I nstrumentation. The inspectors verified laboratory analytical instruments daily performance checks and calibration data indicated the frequency of calibrations was adequate and there was no indication of degraded instrument performance.
 
The inspectors reviewed performance for the planchet counter-S's and the high purity germanium and germanium lithium detector Nos. 1 ,2,3, and 4 systems.Whole Bodv Counter. The inspectors reviewed the methods and sources used to perform whole body counter functional checks before daily use and verified the check sources are appropriate and align with the plant isotopic mix.. The inspectors reviewed the most recent calibration report for the whole body counter and verified the sources used were representative of the plant source term and that appropriate calibration reference devices were used.Enclosure 17 Post Accident Monitorinq lnstrumentation. The inspectors reviewed a post accident high-range monitor calibration.
 
e The inspectors verified that an electronic calibration was performed for all range decades above 10 rem/hour and that at least one decade at or below 10 rem/hour were calibrated using an appropriate radiation source.o The inspectors verified that the acceptance criteria were reasonable.. The inspectors reviewed the calibration of two high-range effluent monitors and reviewed their availability.
 
o The inspectors reviewed FitzPatrick's capability to collect high-range, post accident iodine effluent samples.. There was no opportunity to observe electronic or radiation calibration of these instruments during this inspection:
portal monitors, personnel contamination monitors.
 
and small article monitors.. The inspectors verified that the alarm set-point values for one of each type of these instruments were reasonable to ensure that licensed material was not released from the site.o The inspectors reviewed the calibration documentation for each instrument selected.Portable Survev lnstruments.
 
Area Radiation Monitorinq Svstem. Electronic Dosimetrv, and Air Samplers/
Continuous Atmospheric Monitorinq (CAMs). The inspectors reviewed calibration documentation for at least one of each type of instrument.
 
The inspectors reviewed detector measurement geometry and calibration methods and had the technician demonstrate the use of its instrument calibrator.. The inspectors verified that FitzPatrick staff took appropriate corrective action for instruments found significantly out of calibration and evaluated the possible consequences of instrument use since the last successful calibration or source check.lnstrument Calibrator. The inspectors reviewed the current output values and verified FitzPatrick periodically measured calibrator output over the range of instruments used.o The inspectors verified the measurement device was calibrated by a facility using N IST traceable sources.Calibration and Check Sources. The inspectors verified the check sources used were representative of the types and energies of the radiation encountered in the plant.Problem ldentification and Resolution. The inspectors verified that problems associated with radiation monitoring instrumentation were being identified at the appropriate threshold and entered into the CAP.Enclosure 18 b. Findinos No findings were identified.
 
{{a|2RS7}}
==2RS7 Radiolooical==
 
Environmental Monitorinq Proqram (71124.07 - 1 sample)a. Inspection Scope The inspectors reviewed the annual radiological environmental operating reports and the results of any FitzPatrick assessments since the last inspection, to verify that the radiological environmental monitoring program (REMP) was implemented in accordance with the plant TSs and the ODCM. The inspectors reviewed the report for changes to the ODCM with respect to environmental monitoring, commitments in terms of sampling locations, monitoring and measurement frequencies, land use census, interlaboratory comparison program, and analysis of data.The inspectors reviewed the ODCM to identify locations of environmental monitoring stations.The inspectors reviewed the UFSAR for information regarding the environmental monitoring program and meteorological monitoring instrumentation.
 
The inspectors reviewed the annual effluent release report and the 10 CFR Part 61 ,"Licensing Requirements for Land Disposal of Radioactive Waste," report, to determine if FitzPatrick was sampling, as appropriate, for the predominant and dose-causing radionuclides likely to be released in effluents.
 
The inspectors walked down air sampling stations and thermoluminescent dosimeter (TLD) monitoring stations to determine whether they were located as described in the ODCM and to determine the equipment material condition' For the air samplers and TLDs selected above, the inspectors reviewed the calibration and maintenance records to verify that they demonstrate adequate operability of these components.
 
Additionally, the inspectors reviewed the calibration and maintenance records of composite water samplers as available.
 
The inspectors verified that FitzPatrick staff had initiated sampling of other appropriate media upon loss of a required sampling station.The inspectors observed the collection and preparation of environmental samples from different environmental media (e.9., ground and surface water, milk, vegetation, sediment, and soil) as available.
 
The inspectors verified that environmental sampling was representative of the release pathways as specified in the ODCM and that sampling techniques were in accordance with procedures.


10Permanent modification of the RPS to support RPS test box usage duringsurveillance testing, thereby preventing initiation of actual half scrams due to testing,performed in accordance with Engineering Change (EC) 15347, "lnstall PomanaType Test Jacks in Panels 09-15, 09-17 for RPS Test Box Use;" andTemporary modification of the 'A' and 'B' reactor water recirculation motor-generatorsthat recalibrated the tachometer generator voltage regulator circuits to produce alower voltageto-speed response, performed in accordance with EC 25477 and EC25480, "Recirc Tach Generator 02-184P-1A/B(TACH) 115V Output Acceptance."b.FindinqsNo findings were identified.1 R19 Post-Maintenance Testinq (PMT) (71 1 1 1
Based on direct observation and review of records, the inspectors verified that the meteorological instruments were operable, calibrated, and maintained in accordance with guidance contained in the UFSAR, NRC Regulatory Guide 1.23, "Meteorological Monitoring Programs for Nuclear Power Plants," and FitzPatrick procedures.


===.19 - 6 samples)a.Inspection ScopeThe inspectors reviewed post-maintenance test procedures and associated testingactivities for selected risk-significant mitigating systems to assess whether the effect ofmaintenance on plant systems was adequately addressed by control room andengineering personnel. The inspectors verified whether test acceptance criteria wereclear, demonstrated operational readiness, and were consistent with DBDs; testinstrumentation had current calibrations, adequate range, and accuracy for theapplication; and tests were performed, as written, with applicable prerequisites satisfied.Upon completion, the inspectors verified whether equipment was returned to the properalignment necessary to perform its safety function. PMT was evaluated for conformancewith the requirements of 10 CFR Part 50, Appendix B, Criterion Xl, "Test Control." Thedocuments reviewed are listed in the Attachment. PMT activities associated with thefollowing WOs were reviewed:. WO 00228000, preventive maintenance on the'A' standby gas treatment (SGT)system;. WO 5203502A, preventive maintenance replacement of 05A-K128D, an RPS relayfor annunciator 09-5-2-60;o WO 29026203, replacement of 'A' EDG local frequency meter;. WO 52222339, RPS reactor pressure instrument response time testing of 05A-K101C;. WO 23477801, rebuild core spray'B'hold pump; and. WO 52038354, replacement of RCIC low steam pressure master trip unit, 13MTU-287C.These activities constituted six PMT inspection samples.FindinqsNo findings were identified.b.Enclosure===
The inspectors verified that the meteorological data readout and recording instruments in the control room and at the tower were operable.Enclosure 19 The inspectors verified that missed and or anomalous environmental samples were identified and reported in the annual environmental monitoring report. The inspectors reviewed FitzPatrick's assessment of any positive sample results. The inspectors reviewed the associated radioactive effluent release data that was the source of the released material.The inspectors selected SSCs that involved or could reasonably involve licensed material for which there is a credible mechanism for licensed material to reach ground water, and verified that FitzPatrick had implemented a sampling and monitoring program sufficient to detect leakage of these SSCs to ground water. There have been no significant changes in this program area since the last inspection.


111R22 Surveillance Testinq (71111.22 - 7 samples)a. Insoection ScopeThe inspectors witnessed performance of surveillance tests (STs) and/or reviewed testdata of selected risk-significant SSCs to assess whether the SSCs satisfied TSs,UFSAR, technical requirements manual, and station procedure requirements. Theinspectors reviewed whether test acceptance criteria were clear, demonstratedoperational readiness, and were consistent with DBDs; test instrumentation had currentcalibrations, adequate range, and accuracy for the application; and tests wereperformed, as written, with applicable prerequisites satisfied. Upon ST completion, theinspectors verified that equipment was returned to the status specified to perform itssafety function. The following STs were reviewed:. ST-2AL, "RHR Loop A Quarterly Operability Test (lST)," Revision 31;. ST-2XA, "RHR service Water Loop A Quarterly Operability Test (lST)," Revision 13;. ST-2AM, "RHR Loop B Quarterly Operability Test (lST)," Revision 31;. ST-24J, "RCIC Flow Rate and Inservice Test (lST),' Revision 41;. ISP-10OD-RPS, "RPS Instrument Functional TesUCalibration (ATTS)," Revision 37;. ST-3PB, "Core Spray Loop B Quarterly Operability," Revision 21; ando ISP-16, "Drywell Floor Drain Sump Flow Loop FunctionalTesUCalibration*," Revision36.These activities represented seven surveillance testing inspection samples.b. FindinosNo findings were identified.2.
The inspectors verified that records, as required by 10 CFR Part 50.75(9), of leaks, spills, and remediation since the previous inspection were retained in a retrievable manner.The inspectors reviewed any significant changes made by FitzPatrick to the ODCM as the result of changes to the land census, long-term meteorological conditions (three year average), or modifications to the sampler stations since the last inspection.


==RADIATION SAFETY==
The inspectors reviewed technicaljustifications for any changed sampling locations.


===Cornerstone:===
The inspectors verified that FitzPatrick performed the reviews required to ensure that the changes did not affect its ability to monitor the impacts of radioactive effluent releases on the environment.
Occupational Radiation Safety and Public Radiation Safety2RS1 Radioloqical Hazard Assessment and Exposure Controls (71124.01- 1 sample)a. Inspection ScopeThe inspectors reviewed the performance indicators for the Radiation Cornerstone,recent operational occurrences and the latest quality assurance audit of the RadiationProtection program.Radioloqical Hazard AssessmentThe inspectors reviewed changes to plant operations that may result in a significant newradiological hazard for onsite workers or members of the public since the last inspection.The inspectors verified that FitzPatrick staff have assessed the potential impact of thesechanges and has implemented periodic monitoring, as appropriate, to detect andq uantify the rad iolo gical hazard.Recent radiological surveys from more than six plant areas were reviewed by theEnclosure 12inspectors to evaluate the thoroughness and frequency of the surveys and that theywere appropriate based on the radiological hazards.The inspectors conducted walkdowns and performed independent radiation surveys ofthe facility, including radioactive waste processing, storage, and handling areas, toevaluate the existing radiological conditions and the efficacy of the associatedradiological postings and controls.The inspectors observed and evaluated the following radiological risk-significant workactivity: Placement of a shield lid on top of a loaded on-site storage container in theradwaste truck bay (a transient locked high radiation area (HRA)).With respect to the above work activity, the inspectors verified that appropriate preworksurveys were performed and were sufficient to identify and quantify the radiologicalhazards and to establish adequate protective measures. In addition, the inspectorsreviewed applicable radiological surveys associated with this work activity to determine ifhazards were properly identified, including the following: identification of hot particles,the presence of alpha emitters, the potentialfor airborne radioactive materials, thehazards associated with work activities that could negatively affect the radiologicalconditions, and any significant radiation field dose gradients that could result innonuniform exposures of the body. The inspectors selected at least five air samplesurvey records during 2011 and verified that the samples were collected and counted inaccordance with FitzPatrick procedures. The inspectors observed work in potentialairborne areas to evaluate if applicable air monitoring was representative of thebreathing air zone of the workers. The inspectors also reviewed the use of continuousair monitors to monitor real-time airborne conditions in accordance with FitzPatrickprocedures. The inspectors verified that FitzPatrick's program for monitoring loosesurface contamination in areas of the plant was adequate to assess the potential forairborne contamination conditions.Instructions to WorkersThe inspectors observed various radioactive material containers and verified that theywere labeled and controlled in accordance with 10 CFR Parl2Q requirements.Radiation work permits (RWPs) associated with the radiological risk-significant workactivities listed above were evaluated by the inspectors to identify what work controlinstructions or control barriers were specified and that plant-specific technicalspecification HRA requirements were met, including the use of applicable electronicpersonal dosimeter alarm setpoints that were specified in conformance with surveyindications and plant policy.The inspectors reviewed one electronic personal dosimeter dose rate alarm occurrencethat was documented in a CR. The inspectors verified that FitzPatrick staff respondedappropriately to the occurrence and that corrective actions and dose evaluations wereadequate.Enclosure 13Contamination and Radioactive Material ControlThe inspectors conducted observations at the main radiological controlled area egresslocation to observe the performance of personnel surveying and releasing material forunrestricted use to verify that those activities were performed in accordance with plantprocedures and the procedures were sufficient to control the spread of contaminationand prevent unintended release of radioactive materials from the site.The inspectors reviewed FitzPatrick's criteria for the survey and release of potentiallycontaminated material and verified that the radiation detection instrumentation was beingused at its most effective sensitivity capability.The inspectors selected three sealed sources from FitzPatrick's inventory records andverified that the required semi-annual leak tests were performed. The inspectors verifiedthat there have been no changes in the inventory of sources currently listed in theNational Source Tracking System.Radioloqical Hazards Control and Work CoveraqeDuring tours of the facility and review of the work activity listed above, the inspectorsevaluated the ambient radiological conditions and verified that existing conditions wereconsistent with posted surveys, RWPs, and worker briefings, as applicable.During these work activity performance observations, the inspectors verified theadequacy of radiological controls, such as required surveys (including system breachradiation, contamination, and airborne surveys), radiation protection job coverage(including audio and visual surveillance for remote job coverage), contaminationcontrols, and means of using electronic personal dosimeters in high noise areas as HRAmonitoring devices.The inspectors verified that radiation monitoring devices were placed on the individual'sbody appropriately to monitor dose from external radiation sources. This reviewincluded high-radiation work areas with significant dose rate gradients.The inspectors reviewed two RWPs for work within potential airborne radioactivity areaswith the potential for individual worker internal exposures. The inspectors evaluated theairborne radioactivity controls and monitoring, including potentials for significant airborneradioactivity levels (e.g., grinding, grit blasting, system breaches, entry into tanks,cubicles, reactor cavities). For these selected potential airborne radioactive areas, theinspectors verified the appropriate use of high-efficiency particulate air ventilation systemoperation.The inspectors examined the station's physical and programmatic controls for highlyactivated or contaminated materials (nonfuel) stored within the spent fuel pool andverified that appropriate controls were in place to preclude inadvertent removal of thesematerials from the pool.Tours within the radiological controlled area were conducted by the inspectors toevaluate radiological postings and physical controls for HRAs and very high radiationareas (VHRAs) with respect to regulatory requirements.Enclosure 14Risk-Siqnificant Hiqh Radiation Area and Verv Hiqh Radiation Area ControlsThe inspectors discussed with the radiation protection manager and one first-line healthphysics supervisor, the controls and procedures for high-risk HRAs and VHRAs andactions to be taken during changing plant conditions.b.Radiation Worker PerformanceDuring observation of the work activity listed above, the inspectors observed radiationworker performance with respect to applicable radiation protection work requirements todetermine if workers were aware of the significant radiological conditions in theirworkplace and their work performance was within the RWP control/limit requirementsspecified for the work performed.The inspectors reviewed several radiological problem reports since the last inspectionthat identified the cause of the event to be human performance errors to determine ifthere was an observable pattern traceable to a similar cause and if this perspectivematched the corrective action approach taken by station personnelto resolve thereported problems.Radiation Protection Technician ProficiencvDuring observation of the work activity listed above, the inspectors evaluated theperformance of radiation protection technicians with respect to radiation protection workrequirements and determined that technicians were aware of the radiological conditionsin their workplace and that the RWP controls/limits and their performance was consistentwith their training and qualifications with respect to the radiological hazards and workactivities.The inspectors reviewed several radiological problem reports since the last inspectionthat identified the cause of the event to be radiation protection technician error todetermine if there was an observable pattern traceable to a similar cause and if thisperspective matched the corrective action approach taken by FitzPatrick staff to resolvethe reported problems.Problem ldentification and ResolutionThe inspectors verified that problems associated with radiation monitoring and exposurecontrol were being identified by FitzPatrick personnel at an appropriate threshold andwere properly addressed for resolution in the corrective action program (CAP).FindinqsNo findings were identified.Occupational Dose Assessment (7 1 124.04)2RS4a. Inspection ScopeThe inspectors reviewed the most recent National Voluntary Laboratory AccreditationProgram (NVLAP) accreditation report on FitzPatrick.Enclosure 15The inspectors verified that FitzPatdck's personnel dosimeters that require processingwere NVLAP accredited. The inspectors verified the vendor's NVLAP accreditation.The inspector ensured that the approved irradiation test categories for each type ofpersonnel dosimeter used were consistent with the types and energies of the radiationpresent, and how the dosimeter was being used.The inspectors verified that FitzPatrick informed workers, as appropriate, of the risks ofradiation exposure to the embryo/fetus, the regulatory aspects of declaring a pregnancy,and the specific process to be used for (voluntarily) declaring a pregnancy.The inspectors selected individuals who had declared their pregnancy during the currentassessment period, and verified that FitzPatrick's radiological monitoring program fordeclared pregnant workers was technically adequate to assess the dose to theembryo/fetus. The inspectors reviewed the exposure results and monitoring controlsemployed by FitzPatrick and with respect to the requirements of 10 CFR Part 20. Twoworkers had declared pregnancies in the past 12 months.b. FindinosNo findings were identified.2RS5 Radiation Monitorinq lnstrumentation (71124.05)Inspection ScopeDuring the period July 18 through 22,2011, the inspectors conducted the followingactivities to verify that FitzPatrick personnel were providing accurate and operableradiation monitoring instruments used to 1) monitor areas, materials, and workers toensure a radiologically safe work environment, and 2) detect and quantify radioactiveprocess streams and effluent releases. lmplementation of these controls was reviewedagainst the criteria contained in 10 CFR Part 20, relevant TSs, and FitzPatrick'sprocedures.r The inspectors reviewed the UFSAR to identify applicable radiation monitorsassociated with transient high and VHRAs including those used in remoteemergency assessment.r The inspectors obtained a list of in-service survey instrumentation including airsamplers, neutron survey instruments, personnel and small article monitors. Theinspectors reviewed the list to determine if an adequate number of instruments wereavailable to support operations.o The inspectors reviewed two FitzPatrick self-assessments for contamination andradioactive material control and radiation protection instrumentation and protectiveequipment.r The inspectors reviewed source check and calibration procedures for the radiationmonitoring instruments.. The inspectors reviewed alarm set-points for area radiation monitors and the basisfor the set-points.o The inspectors reviewed the alarm sefpoints and basis for effluent monitors and themethods used to calculate the set-points.Enclosure 16Walkdowns and Observationso The inspectors walked down the following radiation monitors:a) 17-04-1 drywell monitor'A';b) 17-04-2 drywell monitor'B';c) 17-RM-150'A'/'B' steam jet air ejector(SJAE) off-gas;d) 17RM-461 TB exhaust;e) 17RM-351 service water;f) 17RM-350 liquid radwaste effluent monitor; andg) 17RM-456 refuelfloor exhaust;. The inspectors verified that configuration of the monitors aligned with the OffsiteDose Calculation Manual (ODCM) descriptions. The inspectors looked for monitordegradation and out of service tags.o The inspectors verified the calibration and source checkof 10 portable surveyinstruments and observed their material condition.o The inspectors observed source checks of portable survey instruments.. The inspectors walked down eight area radiation monitors and verified the readoutwith a portable survey instrument.r The inspectors verified periodic source checks were performed for two personnelmonitors and two small article monitors.Calibration and Testinq Prooram. The inspectors verified for three effluent monitor instruments that channel calibrationand functional tests were performed consistent with TSs and the ODCM. Theinspectors also verified that the monitors were calibrated with National Institute ofStandards and Technology (NIST) traceable sources that represent the plant nuclidemix.o The inspectors verified that the effluent monitor alarm set-points were established ator below the ODCM limits.Laboratorv I nstrumentation. The inspectors verified laboratory analytical instruments daily performance checksand calibration data indicated the frequency of calibrations was adequate and therewas no indication of degraded instrument performance. The inspectors reviewedperformance for the planchet counter-S's and the high purity germanium andgermanium lithium detector Nos. 1 ,2,3, and 4 systems.Whole Bodv Counter. The inspectors reviewed the methods and sources used to perform whole bodycounter functional checks before daily use and verified the check sources areappropriate and align with the plant isotopic mix.. The inspectors reviewed the most recent calibration report for the whole bodycounter and verified the sources used were representative of the plant source termand that appropriate calibration reference devices were used.Enclosure 17Post Accident Monitorinq lnstrumentation. The inspectors reviewed a post accident high-range monitor calibration.e The inspectors verified that an electronic calibration was performed for all rangedecades above 10 rem/hour and that at least one decade at or below10 rem/hour were calibrated using an appropriate radiation source.o The inspectors verified that the acceptance criteria were reasonable.. The inspectors reviewed the calibration of two high-range effluent monitors andreviewed their availability.o The inspectors reviewed FitzPatrick's capability to collect high-range, post accidentiodine effluent samples.. There was no opportunity to observe electronic or radiation calibration of theseinstruments during this inspection: portal monitors, personnel contaminationmonitors. and small article monitors.. The inspectors verified that the alarm set-point values for one of each type of theseinstruments were reasonable to ensure that licensed material was not released fromthe site.o The inspectors reviewed the calibration documentation for each instrument selected.Portable Survev lnstruments. Area Radiation Monitorinq Svstem. Electronic Dosimetrv,and Air Samplers/ Continuous Atmospheric Monitorinq (CAMs). The inspectors reviewed calibration documentation for at least one of each type ofinstrument. The inspectors reviewed detector measurement geometry andcalibration methods and had the technician demonstrate the use of its instrumentcalibrator.. The inspectors verified that FitzPatrick staff took appropriate corrective action forinstruments found significantly out of calibration and evaluated the possibleconsequences of instrument use since the last successful calibration or sourcecheck.lnstrument Calibrator. The inspectors reviewed the current output values and verified FitzPatrickperiodically measured calibrator output over the range of instruments used.o The inspectors verified the measurement device was calibrated by a facility usingN IST traceable sources.Calibration and Check Sources. The inspectors verified the check sources used were representative of the types andenergies of the radiation encountered in the plant.Problem ldentification and Resolution. The inspectors verified that problems associated with radiation monitoringinstrumentation were being identified at the appropriate threshold and entered intothe CAP.Enclosure 18b. FindinosNo findings were identified.2RS7 Radiolooical Environmental Monitorinq Proqram (71124.07 - 1 sample)a. Inspection ScopeThe inspectors reviewed the annual radiological environmental operating reports and theresults of any FitzPatrick assessments since the last inspection, to verify that theradiological environmental monitoring program (REMP) was implemented in accordancewith the plant TSs and the ODCM. The inspectors reviewed the report for changes tothe ODCM with respect to environmental monitoring, commitments in terms of samplinglocations, monitoring and measurement frequencies, land use census, interlaboratorycomparison program, and analysis of data.The inspectors reviewed the ODCM to identify locations of environmental monitoringstations.The inspectors reviewed the UFSAR for information regarding the environmentalmonitoring program and meteorological monitoring instrumentation.The inspectors reviewed the annual effluent release report and the 10 CFR Part 61 ,"Licensing Requirements for Land Disposal of Radioactive Waste," report, to determine ifFitzPatrick was sampling, as appropriate, for the predominant and dose-causingradionuclides likely to be released in effluents.The inspectors walked down air sampling stations and thermoluminescent dosimeter(TLD) monitoring stations to determine whether they were located as described in theODCM and to determine the equipment material condition'For the air samplers and TLDs selected above, the inspectors reviewed the calibrationand maintenance records to verify that they demonstrate adequate operability of thesecomponents. Additionally, the inspectors reviewed the calibration and maintenancerecords of composite water samplers as available.The inspectors verified that FitzPatrick staff had initiated sampling of other appropriatemedia upon loss of a required sampling station.The inspectors observed the collection and preparation of environmental samples fromdifferent environmental media (e.9., ground and surface water, milk, vegetation,sediment, and soil) as available. The inspectors verified that environmental samplingwas representative of the release pathways as specified in the ODCM and that samplingtechniques were in accordance with procedures.Based on direct observation and review of records, the inspectors verified that themeteorological instruments were operable, calibrated, and maintained in accordancewith guidance contained in the UFSAR, NRC Regulatory Guide 1.23, "MeteorologicalMonitoring Programs for Nuclear Power Plants," and FitzPatrick procedures. Theinspectors verified that the meteorological data readout and recording instruments in thecontrol room and at the tower were operable.Enclosure 19The inspectors verified that missed and or anomalous environmental samples wereidentified and reported in the annual environmental monitoring report. The inspectorsreviewed FitzPatrick's assessment of any positive sample results. The inspectorsreviewed the associated radioactive effluent release data that was the source of thereleased material.The inspectors selected SSCs that involved or could reasonably involve licensedmaterial for which there is a credible mechanism for licensed material to reach groundwater, and verified that FitzPatrick had implemented a sampling and monitoring programsufficient to detect leakage of these SSCs to ground water. There have been nosignificant changes in this program area since the last inspection.The inspectors verified that records, as required by 10 CFR Part 50.75(9), of leaks,spills, and remediation since the previous inspection were retained in a retrievablemanner.The inspectors reviewed any significant changes made by FitzPatrick to the ODCM asthe result of changes to the land census, long-term meteorological conditions (three yearaverage), or modifications to the sampler stations since the last inspection. Theinspectors reviewed technicaljustifications for any changed sampling locations. Theinspectors verified that FitzPatrick performed the reviews required to ensure that thechanges did not affect its ability to monitor the impacts of radioactive effluent releases onthe environment.The inspectors verified that the appropriate detection sensitivities with respect toTS/ODCM were used for counting samples. The inspectors reviewed quality controlcharts for maintaining radiation measurement instrument status and actions taken fordegrading detector performance.The inspectors reviewed the results of FitzPatrick's interlaboratory comparison programto verify the adequacy of environmental sample analyses performed by FitzPatrick. Theinspectors verified that the interlaboratory comparison test included the media/nuclidemix appropriate for the facility.The inspectors verified that problems associated with the REMP were being identified byFitzPatrick at an appropriate threshold and were properly addressed for resolution inFitzPatrick's CAP. The inspectors verified the appropriateness of the corrective actionsfor a selected sample of problems documented by FitzPatrick that involved the REMP.b. FindinqsNo findings were identified.4.
 
The inspectors verified that the appropriate detection sensitivities with respect to TS/ODCM were used for counting samples. The inspectors reviewed quality control charts for maintaining radiation measurement instrument status and actions taken for degrading detector performance.
 
The inspectors reviewed the results of FitzPatrick's interlaboratory comparison program to verify the adequacy of environmental sample analyses performed by FitzPatrick.
 
The inspectors verified that the interlaboratory comparison test included the media/nuclide mix appropriate for the facility.The inspectors verified that problems associated with the REMP were being identified by FitzPatrick at an appropriate threshold and were properly addressed for resolution in FitzPatrick's CAP. The inspectors verified the appropriateness of the corrective actions for a selected sample of problems documented by FitzPatrick that involved the REMP.b. Findinqs No findings were identified.


==OTHER ACTIVITIES==
==OTHER ACTIVITIES==
4QA1 Performance Indicator Verification (71151 - 6 samples).1 Mitiqatinq Svstems Cornerstone - Safetv Svstem Functional Failures (1 sample)Enclosure a.20lnspection ScopeThe inspectors sampled FitzPatrick's submittals for the safety system functional failuresperformance indicator for the period of October 1,2Q1Q, through June 30, 201 1. Todetermine the accuracy of the performance indicator data reported during that period,the inspectors used definitions and guidance contained in Nuclear Energy lnstitute (NEl)99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6. Theinspectors reviewed licensee event reports (LERs) and NRC integrated inspectionreports to validate the accuracy of the submittals.FindinqsNo findings were identified.Barrier Inteoritv Cornerstone - Reactor Coolant Svstem (RCS) Specific Activitv and RCSLeakaqe (2 samples)Inspection ScopeThe inspectors reviewed FitzPatrick staff's submittals for the RCS specific activity andRCS leakage performance indicators for the period of October 1, 2010, through June 30,2Q11. To determine the accuracy of the performance indicator data reported during thatperiod, the inspectors used definitions and guidance contained in NEI 99-02. Theinspectors reviewed RCS sample analysis and control room log summaries and tovalidate the accuracy of the submittals.FindinosNo findings were identified.lnitiatinq Events Cornerstone - Unolanned Scrams, Unplanned Power Chanoes. andUnplanned Scrams with Complications (3 samples)lnspection ScopeThe inspectors reviewed FitzPatrick staff's submittals for the unplanned scrams per7,000 critical hours, unplanned power changes per 7,000 critical hours, and unplannedscrams with complications performance indicators for the period of October 1,2010,through June 30, 2011. To determine the accuracy of the performance indicator datarepo(ed during that period, the inspectors used definitions and guidance contained inNEI 99-02. The inspectors reviewed control room logs and NRC integrated inspectionreports to validate the accuracy of the submittals.b..2a.b..3Enclosure b.21Findinoslntroduction: The inspectors identified an unresolved item (URl) associated withFitzPatrick staff's interpretation of guidance for reporting unplanned power changes per7,000 critical hours. Specifically, Entergy personnel did not report three powerreductions during the second quarter of 2011 that the inspectors considered to havebeen reportable. The unplanned power changes per 7,000 critical hours performanceindicator is defined as the number of unplanned changes in reactor power of greaterthan 20 percent of full-power, per 7,000 hours of critical operation excluding manual andautomatic scrams.Description: On January 11,2011, FitzPatrick operators performed a power reduction to55 percent to plug a leaking condenser tube. This power reduction was reported in thefirst quarter performance indicators as an unplanned power change. The root causeevaluation of this event determined that additional condenser tube leaks could occur. Asa result, an operational decision-making issue (ODMI) action plan was developed byEntergy staff, which established four action levels for chemistry parameters (condensatedemineralizer influent (CDl) conductivity, reactor water conductivity, and reactor waterchloride concentration). These action levels provide guidance for operators to perform arange of actions, such as a power reduction to support condenser tube plugging. Theaction plan was established on April 4, 2011.On May 6,2011, operators observed indications of a rapid increase in hotwellconductivity and determined that CDI conductivity increased to above action level 3. Inaccordance with the ODMI action plan operators reduced power to 55 percent later thatday to identify and plug the leaking main condenser tube.The inspectors reviewed the guidance for reporting performance indicators in NEI 99-02,"Regulatory Assessment Performance lndicator Guideline," Revision 6. Concerningunplanned power reductions per 7,000 critical hours, the guidance states, "This indicatorcaptures changes in reactor power that are initiated following the discovery of an off-normal condition. lf a condition is identified that is slowly degrading and the licenseeprepares plans to reduce power when the condition reaches a predefined limit, and 72hours have elapsed since the condition was first identified, the power change does notcount. lf, however, the condition suddenly degrades beyond the predefined limits andrequires rapid response, this situation would count."In follow-up questions regarding the May 6 down power Entergy staff indicated that thedown power was planned as a contingency action in the ODMI action plan and that,because the initial condition for which the action plan was written occurred greater than72 hours prior to the down power, the down power should not be counted. Theinspectors considered that notwithstanding an action plan, the condition was bestdescribed as a suddenly degrading condition that resulted in operators decreasingpower the same day to address the condition. Therefore, it appeared to be appropriateto report the May 6 down power as unplanned.In addition, the inspectors determined that FitzPatrick operators performed two powerreductions to 75 percent on June 7, and June 9, 2011, to support cleaning maincondenser water boxes. This cleaning was necessary to address fouling that occurredduring planned maintenance on the lake intake travelling screens. The fouling was theresult of operation of circulating water system gates which caused sediment to beEnclosure 4cA222ingested by the circulating water system. The inspectors determined that FitzPatrickstaff did not report these two down powers as unplanned in the second quarter Pl.The inspectors reviewed the applicable guidance in NEI 99-02 which indicated that"Anticipated power changes greater than 20 percent in response to expectedenvironmental problems (such as accumulation of marine debris, biologicalcontaminants, animal intrusion, environmental regulations, or frazil icing) may qualify foran exclusion from the indicator. The licensee is expected to take reasonable steps toprevent intrusion of animals, marine debris, or other biological groMh from causingpower reductions. Intrusion events that can be anticipated as a part of a maintenanceactivity or as part of a predictable cyclic behavior would normally be counted, unless thedown power was planned 72 hours in advance . . ."FitzPatrick's staff indicated they considered this allowance to be applicable, in that theyhad taken reasonable steps to prevent intrusion by cleaning the lake water forebaysprior to the maintenance. Because this activity had not been performed on line since thetraveling screens had been replaced, station personnel also considered that they couldnot reasonably have anticipated the severity of the fouling that occurred. Finatty,FitzPatrick staff included a contingency down power in the work week schedule, andnoted in the applicable operating procedure that operation of the gates may require apower reduction to perform condenser cleaning.Notwithstanding an acknowledgement by FitzPatrick staff in their procedures and workweek schedule as to the possibility of a need for a plant down power, the inspectorsconsidered that these two down power conditions were anticipated as part of amaintenance activity and appeared to have not been plannedT2 hours in advance.Therefore the inspectors had questions as to the appropriateness of not reporting theplant down powers on June 7 , and June 9, 2011.FitzPatrick staff initiated a review of these issues as part of the NRC and industryperformance indicator "frequently asked questions" (FAO) process. This item remainsunresolved pending further information from the FAQ process. (URl05000333/201 1004-01, Unplanned Power Reduction Pl Reporting)ldentification and Resolution of Problems (71152 - 2 samples)Review of ltems Entered into the Corrective Action ProqramInspection ScopeAs required by lnspection Procedure71152, "ldentification and Resolution of Problems,"to identify repetitive equipment failures or specific human performance issues for follow-up, the inspectors performed a daily screening of all items entered into FitzPatrick'sCAP. The review was accomplished by accessing FitzPatrick's computerized databasefor CRs and attending CR screening meetings. In accordance with the baselineinspection procedures, the inspectors selected items across the Initiating Events,Mitigating Systems, Barrier Integrity, and Public Radiation Safety cornerstones foradditionalfollow-up and review. The inspectors assessed FitzPatrick personnel'sthreshold for problem identification, the adequacy of the Gause analyses, and extent ofcondition review, operability determinations, and the timeliness of the specifiedcorrective actions..1a.Enclosure 23b..2a.The inspector reviewed 12 corrective action CRs that were initiated since the lastradioactive effluent inspection that were associated with this program area. Theinspector verified that problems identified by these CRs were properly characterized inFitzPatrick's event reporting system and that applicable causes and corrective actionswere identified commensurate with the safety significance of the radiologicaloccurrences.Findinqs and ObservationsNo findings were identified.Annual Sample: Review of a Low Pressure Coolant Iniection Valve Demand Failure (1sample)Inspection ScopeThe inspectors selected CR-JAF-2010-04912 as a problem identification and resolutionsample for a detailed follow-up review. This CR documented that on August 30, 2010,the 'B' RHR system low pressure safety injection (LPSI) outboard motor operated valve(MOV), 10MOV-278, failed to open during a routine surveillance test. 10MOV-27B is anormally open valve that was closed to maintain reactor coolant pressure boundarywhile stroke testing the LPSI inboard isolation valve, 10MOV-258. Entergy staff initiatedcorrective actions to replace the lower motor operator contact assembly (fingerbase),send the fingerbase for chemical analysis of residue on the contacts, and inspect upperand lower fingerbases for all risk significant MOVs in close proximity to 10MOV-278.The inspectors assessed FitzPatrick's problem identification threshold, apparent causeevaluation (ACE), extent of condition reviews, operability evaluations, and theprioritization and timeliness of corrective actions to determine whether FitzPatrick wasappropriately identifying, characterizing, and correcting problems associated with theidentified issues and whether the planned or completed corrective actions wereappropriate to prevent recurrence.Findinqs and ObservationsNo findings were identified. The inspectors determined that FitzPatrick staff properlyimplemented their CAP regarding the initial discovery of the reviewed issue. The CRpackages were complete and included an ACE, operability evaluations, extent ofcondition reviews, use of operating experience, and contained implemented and plannedcorrective actions. Additionally, the elements of the CRs, ACE, and operabilityevaluations were detailed and thorough. lmplemented and planned corrective actionswere appropriate to minimize the potential of recurrence.Additionally, the inspectors reviewed chemical analysis performed by an independentcontracted laboratory on the surface contamination of the contact assembly fingers.Analysis showed that the contact fingers had an even black tarnish consisting of sulfur.The analysis determined that sulfur can be damaging to electrical contacts due tocausing increased contact resistance. However, the analysis also showed that if voltageand current across the contacts was sufficient the damaging effects of the sulfide wouldbe negligible. FitzPatrick staff concluded that source of the tarnish layer was unknown.b.Enclosure 24Per the recommendation in the independent analysis, FitzPatrick staff reviewed thematerial condition of the upper and lower fingerbases for risk significant MOVs in closeproximity to 10MOV-278. The inspectors concluded that a more thorough extent ofcondition may have included a review of 10MOV-278 mainlenance records to determineif other risk significant MOVs had been subjected to similar conditions and maintenancewhich may have led to contact tarnishing. Further, any MOVs identified as beingsusceptible to contact tarnishing could then have been included in the review of upperand lower fingerbases. However, the inspectors concluded that FitzPatrick's extent ofcondition was adequate because the tarnish layer on the contacts was not considered tobe the cause of the MOV failure and there have been no similar MOV failures..3 Annual Sample: Review of the Operator Workaround Proqram (1 sample)a. Inspection ScopeFitzPatrick operations department personnel monitor the impact of plant deficiencies onoperational response capabilities in accordance with EN-FAP-OP-006, "OperatorAggregate lmpact Index Performance Indicator," Revision 0. As inputs, this procedureutilizes the plant effect code that was assigned to the equipment deficiency in theassociated work order, and the age of active equipment tagouts. From this, plantdeficiencies such as operator workarounds, operator burdens, control room deficienciesand alarms, and longstanding tagouts, are tallied and converted to a performanceindicator on a monthly basis. lf the performance indicator is above a threshold value,then a more in-depth assessment of the aggregate impact of plant deficiencies isperformed in accordance with surveillance test procedure ST-99H, "OperationsCumulative lmpact Assessment," Revision 10. FitzPatrick personnel also perform thisassessment on a periodic basis.The inspectors reviewed the results of ST-99H, completed on April 5,2011, including theresolution of items identified in the assessment. The inspectors reviewed operatorworkarounds (deficient conditions that require compensatory operator actions foroperation during off-normal plant conditions), operator burdens (deficient conditions thatrequire compensatory operator actions for operation during normal plant conditions),control room deficiencies such as non-functional or incorrect display information andequipment controls requiring some off-normal mode of operation, and longstandingtagouts, to assess their effect on the operator's ability to implement operatingprocedures under normal, off-normal, and emergency conditions.b. Findinqs and ObservationsNo findings were identified. The inspectors determined that the station's CAP waseffectively used to identify and resolve operator workaround conditions.4OA3 Follow-up of Events and Notices of Enforcement Discretion (71153 - 1 sample).1 (Closed) LER 05000333/2011002-00, Failure to lsolate the Reactor Building Results in aCondition Prohibited by Technical SpecificationsOn January 10,2011, the 'A' refueling floor exhaust radiation monitor was declaredinoperable for maintenance. For this condition, TS 3.3.6.2 requires that the reactorbuilding ventilation system be isolated and that the standby gas treatment (SGT) systemEnclosure 25be placed in operation within 24 hours. At the start of this maintenance activity thisconfiguration had already been established to support another unrelated maintenanceactivity. Operators did not adequately track the TS requirements for the 'A' refuel floorexhaust radiation monitor being inoperable, and as a result, reactor building ventilationwas restored at 12:30 pm after completion of the other maintenance activity. Thefollowing day, operators recognized the error and isolated the reactor building ventilationsystem at2:54 pm.The inspectors reviewed the LER and CR-JAF-2011-00189 regarding this event. Theenforcement aspects of the TS violation are discussed in Section
4QA1 Performance Indicator Verification (71151 - 6 samples).1 Mitiqatinq Svstems Cornerstone - Safetv Svstem Functional Failures (1 sample)Enclosure a.20 lnspection Scope The inspectors sampled FitzPatrick's submittals for the safety system functional failures performance indicator for the period of October 1,2Q1Q, through June 30, 201 1. To determine the accuracy of the performance indicator data reported during that period, the inspectors used definitions and guidance contained in Nuclear Energy lnstitute (NEl)99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6. The inspectors reviewed licensee event reports (LERs) and NRC integrated inspection reports to validate the accuracy of the submittals.
 
Findinqs No findings were identified.
 
Barrier Inteoritv Cornerstone - Reactor Coolant Svstem (RCS) Specific Activitv and RCS Leakaqe (2 samples)Inspection Scope The inspectors reviewed FitzPatrick staff's submittals for the RCS specific activity and RCS leakage performance indicators for the period of October 1, 2010, through June 30, 2Q11. To determine the accuracy of the performance indicator data reported during that period, the inspectors used definitions and guidance contained in NEI 99-02. The inspectors reviewed RCS sample analysis and control room log summaries and to validate the accuracy of the submittals.
 
Findinos No findings were identified.
 
lnitiatinq Events Cornerstone - Unolanned Scrams, Unplanned Power Chanoes. and Unplanned Scrams with Complications (3 samples)lnspection Scope The inspectors reviewed FitzPatrick staff's submittals for the unplanned scrams per 7,000 critical hours, unplanned power changes per 7,000 critical hours, and unplanned scrams with complications performance indicators for the period of October 1,2010, through June 30, 2011. To determine the accuracy of the performance indicator data repo(ed during that period, the inspectors used definitions and guidance contained in NEI 99-02. The inspectors reviewed control room logs and NRC integrated inspection reports to validate the accuracy of the submittals.
 
b..2 a.b..3 Enclosure b.21 Findinos lntroduction:
The inspectors identified an unresolved item (URl) associated with FitzPatrick staff's interpretation of guidance for reporting unplanned power changes per 7,000 critical hours. Specifically, Entergy personnel did not report three power reductions during the second quarter of 2011 that the inspectors considered to have been reportable.
 
The unplanned power changes per 7,000 critical hours performance indicator is defined as the number of unplanned changes in reactor power of greater than 20 percent of full-power, per 7,000 hours of critical operation excluding manual and automatic scrams.Description:
On January 11,2011, FitzPatrick operators performed a power reduction to 55 percent to plug a leaking condenser tube. This power reduction was reported in the first quarter performance indicators as an unplanned power change. The root cause evaluation of this event determined that additional condenser tube leaks could occur. As a result, an operational decision-making issue (ODMI) action plan was developed by Entergy staff, which established four action levels for chemistry parameters (condensate demineralizer influent (CDl) conductivity, reactor water conductivity, and reactor water chloride concentration).
 
These action levels provide guidance for operators to perform a range of actions, such as a power reduction to support condenser tube plugging.
 
The action plan was established on April 4, 2011.On May 6,2011, operators observed indications of a rapid increase in hotwell conductivity and determined that CDI conductivity increased to above action level 3. In accordance with the ODMI action plan operators reduced power to 55 percent later that day to identify and plug the leaking main condenser tube.The inspectors reviewed the guidance for reporting performance indicators in NEI 99-02,"Regulatory Assessment Performance lndicator Guideline," Revision 6. Concerning unplanned power reductions per 7,000 critical hours, the guidance states, "This indicator captures changes in reactor power that are initiated following the discovery of an off-normal condition.
 
lf a condition is identified that is slowly degrading and the licensee prepares plans to reduce power when the condition reaches a predefined limit, and 72 hours have elapsed since the condition was first identified, the power change does not count. lf, however, the condition suddenly degrades beyond the predefined limits and requires rapid response, this situation would count." In follow-up questions regarding the May 6 down power Entergy staff indicated that the down power was planned as a contingency action in the ODMI action plan and that, because the initial condition for which the action plan was written occurred greater than 72 hours prior to the down power, the down power should not be counted. The inspectors considered that notwithstanding an action plan, the condition was best described as a suddenly degrading condition that resulted in operators decreasing power the same day to address the condition.
 
Therefore, it appeared to be appropriate to report the May 6 down power as unplanned.
 
In addition, the inspectors determined that FitzPatrick operators performed two power reductions to 75 percent on June 7, and June 9, 2011, to support cleaning main condenser water boxes. This cleaning was necessary to address fouling that occurred during planned maintenance on the lake intake travelling screens. The fouling was the result of operation of circulating water system gates which caused sediment to be Enclosure 4cA2 22 ingested by the circulating water system. The inspectors determined that FitzPatrick staff did not report these two down powers as unplanned in the second quarter Pl.The inspectors reviewed the applicable guidance in NEI 99-02 which indicated that"Anticipated power changes greater than 20 percent in response to expected environmental problems (such as accumulation of marine debris, biological contaminants, animal intrusion, environmental regulations, or frazil icing) may qualify for an exclusion from the indicator.
 
The licensee is expected to take reasonable steps to prevent intrusion of animals, marine debris, or other biological groMh from causing power reductions.
 
Intrusion events that can be anticipated as a part of a maintenance activity or as part of a predictable cyclic behavior would normally be counted, unless the down power was planned 72 hours in advance . . ." FitzPatrick's staff indicated they considered this allowance to be applicable, in that they had taken reasonable steps to prevent intrusion by cleaning the lake water forebays prior to the maintenance.
 
Because this activity had not been performed on line since the traveling screens had been replaced, station personnel also considered that they could not reasonably have anticipated the severity of the fouling that occurred.
 
Finatty, FitzPatrick staff included a contingency down power in the work week schedule, and noted in the applicable operating procedure that operation of the gates may require a power reduction to perform condenser cleaning.Notwithstanding an acknowledgement by FitzPatrick staff in their procedures and work week schedule as to the possibility of a need for a plant down power, the inspectors considered that these two down power conditions were anticipated as part of a maintenance activity and appeared to have not been plannedT2 hours in advance.Therefore the inspectors had questions as to the appropriateness of not reporting the plant down powers on June 7 , and June 9, 2011.FitzPatrick staff initiated a review of these issues as part of the NRC and industry performance indicator "frequently asked questions" (FAO) process. This item remains unresolved pending further information from the FAQ process. (URl 05000333/201 1004-01, Unplanned Power Reduction Pl Reporting)ldentification and Resolution of Problems (71152 - 2 samples)Review of ltems Entered into the Corrective Action Proqram Inspection Scope As required by lnspection Procedure71152, "ldentification and Resolution of Problems," to identify repetitive equipment failures or specific human performance issues for follow-up, the inspectors performed a daily screening of all items entered into FitzPatrick's CAP. The review was accomplished by accessing FitzPatrick's computerized database for CRs and attending CR screening meetings.
 
In accordance with the baseline inspection procedures, the inspectors selected items across the Initiating Events, Mitigating Systems, Barrier Integrity, and Public Radiation Safety cornerstones for additionalfollow-up and review. The inspectors assessed FitzPatrick personnel's threshold for problem identification, the adequacy of the Gause analyses, and extent of condition review, operability determinations, and the timeliness of the specified corrective actions..1 a.Enclosure 23 b..2 a.The inspector reviewed 12 corrective action CRs that were initiated since the last radioactive effluent inspection that were associated with this program area. The inspector verified that problems identified by these CRs were properly characterized in FitzPatrick's event reporting system and that applicable causes and corrective actions were identified commensurate with the safety significance of the radiological occurrences.
 
Findinqs and Observations No findings were identified.
 
Annual Sample: Review of a Low Pressure Coolant Iniection Valve Demand Failure (1 sample)Inspection Scope The inspectors selected CR-JAF-2010-04912 as a problem identification and resolution sample for a detailed follow-up review. This CR documented that on August 30, 2010, the 'B' RHR system low pressure safety injection (LPSI) outboard motor operated valve (MOV), 10MOV-278, failed to open during a routine surveillance test. 10MOV-27B is a normally open valve that was closed to maintain reactor coolant pressure boundary while stroke testing the LPSI inboard isolation valve, 10MOV-258.
 
Entergy staff initiated corrective actions to replace the lower motor operator contact assembly (fingerbase), send the fingerbase for chemical analysis of residue on the contacts, and inspect upper and lower fingerbases for all risk significant MOVs in close proximity to 10MOV-278.
 
The inspectors assessed FitzPatrick's problem identification threshold, apparent cause evaluation (ACE), extent of condition reviews, operability evaluations, and the prioritization and timeliness of corrective actions to determine whether FitzPatrick was appropriately identifying, characterizing, and correcting problems associated with the identified issues and whether the planned or completed corrective actions were appropriate to prevent recurrence.
 
Findinqs and Observations No findings were identified.
 
The inspectors determined that FitzPatrick staff properly implemented their CAP regarding the initial discovery of the reviewed issue. The CR packages were complete and included an ACE, operability evaluations, extent of condition reviews, use of operating experience, and contained implemented and planned corrective actions. Additionally, the elements of the CRs, ACE, and operability evaluations were detailed and thorough.
 
lmplemented and planned corrective actions were appropriate to minimize the potential of recurrence.
 
Additionally, the inspectors reviewed chemical analysis performed by an independent contracted laboratory on the surface contamination of the contact assembly fingers.Analysis showed that the contact fingers had an even black tarnish consisting of sulfur.The analysis determined that sulfur can be damaging to electrical contacts due to causing increased contact resistance.
 
However, the analysis also showed that if voltage and current across the contacts was sufficient the damaging effects of the sulfide would be negligible.
 
FitzPatrick staff concluded that source of the tarnish layer was unknown.b.Enclosure 24 Per the recommendation in the independent analysis, FitzPatrick staff reviewed the material condition of the upper and lower fingerbases for risk significant MOVs in close proximity to 10MOV-278.
 
The inspectors concluded that a more thorough extent of condition may have included a review of 10MOV-278 mainlenance records to determine if other risk significant MOVs had been subjected to similar conditions and maintenance which may have led to contact tarnishing.
 
Further, any MOVs identified as being susceptible to contact tarnishing could then have been included in the review of upper and lower fingerbases.
 
However, the inspectors concluded that FitzPatrick's extent of condition was adequate because the tarnish layer on the contacts was not considered to be the cause of the MOV failure and there have been no similar MOV failures..3 Annual Sample: Review of the Operator Workaround Proqram (1 sample)a. Inspection Scope FitzPatrick operations department personnel monitor the impact of plant deficiencies on operational response capabilities in accordance with EN-FAP-OP-006, "Operator Aggregate lmpact Index Performance Indicator," Revision 0. As inputs, this procedure utilizes the plant effect code that was assigned to the equipment deficiency in the associated work order, and the age of active equipment tagouts. From this, plant deficiencies such as operator workarounds, operator burdens, control room deficiencies and alarms, and longstanding tagouts, are tallied and converted to a performance indicator on a monthly basis. lf the performance indicator is above a threshold value, then a more in-depth assessment of the aggregate impact of plant deficiencies is performed in accordance with surveillance test procedure ST-99H, "Operations Cumulative lmpact Assessment," Revision 10. FitzPatrick personnel also perform this assessment on a periodic basis.The inspectors reviewed the results of ST-99H, completed on April 5,2011, including the resolution of items identified in the assessment.
 
The inspectors reviewed operator workarounds (deficient conditions that require compensatory operator actions for operation during off-normal plant conditions), operator burdens (deficient conditions that require compensatory operator actions for operation during normal plant conditions), control room deficiencies such as non-functional or incorrect display information and equipment controls requiring some off-normal mode of operation, and longstanding tagouts, to assess their effect on the operator's ability to implement operating procedures under normal, off-normal, and emergency conditions.
 
b. Findinqs and Observations No findings were identified.
 
The inspectors determined that the station's CAP was effectively used to identify and resolve operator workaround conditions.
 
{{a|4OA3}}
==4OA3 Follow-up==
 
of Events and Notices of Enforcement Discretion (71153 - 1 sample).1 (Closed) LER 05000333/2011002-00, Failure to lsolate the Reactor Building Results in a Condition Prohibited by Technical Specifications On January 10,2011, the 'A' refueling floor exhaust radiation monitor was declared inoperable for maintenance.
 
For this condition, TS 3.3.6.2 requires that the reactor building ventilation system be isolated and that the standby gas treatment (SGT) system Enclosure 25 be placed in operation within 24 hours. At the start of this maintenance activity this configuration had already been established to support another unrelated maintenance activity.
 
Operators did not adequately track the TS requirements for the 'A' refuel floor exhaust radiation monitor being inoperable, and as a result, reactor building ventilation was restored at 12:30 pm after completion of the other maintenance activity.
 
The following day, operators recognized the error and isolated the reactor building ventilation system at2:54 pm.The inspectors reviewed the LER and CR-JAF-2011-00189 regarding this event. The enforcement aspects of the TS violation are discussed in Section
{{a|4OA7}}
{{a|4OA7}}
==4OA7 of this report.This LER is closed.4OA4 Supplemental Inspections.1 Licensee Strike Continqencv Plans==
==4OA7 of this report.This LER is closed.4OA4 Supplemental==
{{IP sample|IP=IP 92709}}
 
Inspections
 
===.1 Licensee Strike Continqencv===
 
Plans (92709)a. Inspection Scope The contract between Entergy and the FitzPatrick collective bargaining unit was due to expire during this inspection period. The inspectors evaluated the adequacy of Entergy's strike contingency plan to determine if the required minimum number of qualified personnel were available for the proper operation and safety of the facility, and to determine if the plan complied with TS and CFR requirements.
 
Prior to expiration, a new contract agreement was reached and subsequently ratified.b. Findinqs No findings were identified.
 
{{a|4OA5}}
==4OA5 Other Activities==
 
===.1 Operation===
 
of an Independent Spent Fuel Storaqe Installation (lSFSl) at Operatinq Plants (60855.1)a. Inspection Scope The inspectors verified by direct observation and independent evaluation that FitzPatrick performed loading activities at the ISFSI in a safe manner and in compliance with applicable procedures.
 
b. Findinqs No findings were identified.
 
4OAO Meetinos.
 
lncludinq Exit Exit Meetinq Summarv The inspectors presented the inspection results to Mr. B. Sullivan and other members of Entergy's management at the conclusion of the inspection on October 19, 2011. The Enclosure 26 inspectors asked Entergy personnel whether any materials examined during the inspection should be considered proprietary.
 
No proprietary information was identified by Entergy's personnel.
 
4C.A7 Licensee-ldentified Violations The following violation of very low safety significance (Green) was identified by the licensee and is a violation of NRC requirements which meets the criteria of the NRC Enforcement Policy, for being dispositioned as a Non-Cited Violation.. TS limiting condition for operation (LCO) 3.3.6.2 Condition A requires that, with one channel of the refueling floor exhaust radiation monitors inoperable, the channel be placed in trip within 24 hours. lf Condition A is not met, Condition C actions C.1.1 and C.1
 
===.2 require that the reactor building ventilation===
 
system be isolated and the standby gas treatment system be placed in operation within one hour. FitzPatrick staff identified that, contrary to the above, on January 11,2011, the TS LCO Condition A required action was not completed within 24 hours of having made the'A' refueling floor exhaust radiation monitor inoperable, and that the Condition C required actions C.1.1 and C.1.2 were not subsequently completed within one hour.The inspectors determined this TS violation was of very low safety significance (Green) because it represented only a degradation of the radiological barrier function provided for the secondary containment, as discussed in Inspection Manual Chapter 0609.04, "lnitial Screening and Characterization of Findings." This issue was entered into FitzPatrick's CAP as CR-JAF-2O11-00189.


====a. Inspection Scope====
ATTACHMENT:  
The contract between Entergy and the FitzPatrick collective bargaining unit was due toexpire during this inspection period. The inspectors evaluated the adequacy of Entergy'sstrike contingency plan to determine if the required minimum number of qualifiedpersonnel were available for the proper operation and safety of the facility, and todetermine if the plan complied with TS and CFR requirements. Prior to expiration, a newcontract agreement was reached and subsequently ratified.b. FindinqsNo findings were identified.4OA5 Other Activities.1 Operation of an Independent Spent Fuel Storaqe Installation (lSFSl) at Operatinq Plants(60855.1)a. Inspection ScopeThe inspectors verified by direct observation and independent evaluation that FitzPatrickperformed loading activities at the ISFSI in a safe manner and in compliance withapplicable procedures.b. FindinqsNo findings were identified.4OAO Meetinos. lncludinq ExitExit Meetinq SummarvThe inspectors presented the inspection results to Mr. B. Sullivan and other members ofEntergy's management at the conclusion of the inspection on October 19, 2011. TheEnclosure 26inspectors asked Entergy personnel whether any materials examined during theinspection should be considered proprietary. No proprietary information was identifiedby Entergy's personnel.4C.A7 Licensee-ldentified ViolationsThe following violation of very low safety significance (Green) was identified by thelicensee and is a violation of NRC requirements which meets the criteria of the NRCEnforcement Policy, for being dispositioned as a Non-Cited Violation.. TS limiting condition for operation (LCO) 3.3.6.2 Condition A requires that, with onechannel of the refueling floor exhaust radiation monitors inoperable, the channel beplaced in trip within 24 hours. lf Condition A is not met, Condition C actions C.1.1and C.1 .2 require that the reactor building ventilation system be isolated and thestandby gas treatment system be placed in operation within one hour. FitzPatrickstaff identified that, contrary to the above, on January 11,2011, the TS LCOCondition A required action was not completed within 24 hours of having made the'A' refueling floor exhaust radiation monitor inoperable, and that the Condition Crequired actions C.1.1 and C.1.2 were not subsequently completed within one hour.The inspectors determined this TS violation was of very low safety significance(Green) because it represented only a degradation of the radiological barrier functionprovided for the secondary containment, as discussed in Inspection Manual Chapter0609.04, "lnitial Screening and Characterization of Findings." This issue wasentered into FitzPatrick's CAP as CR-JAF-2O11-00189.ATTACHMENT:  


=SUPPLEMENTAL INFORMATION=
=SUPPLEMENTAL
INFORMATION=


==KEY POINTS OF CONTACT==
==KEY POINTS OF CONTACT==
Enterqv Personnel
Enterqv Personnel  
: [[contact::K. Bronson]], Site Vice President
: [[contact::K. Bronson]], Site Vice President  
: [[contact::B. Sullivan]], General Manager, Plant Operations
: [[contact::B. Sullivan]], General Manager, Plant Operations
: [[contact::C. Adner]], Manager, Operations
: [[contact::C. Adner]], Manager, Operations
: [[contact::V. Bacanskas]], Manager, Design Engineering
: [[contact::V. Bacanskas]], Manager, Design Engineering
: [[contact::C. Brown]], Manager, Quality Assurance, Entergy
: [[contact::C. Brown]], Manager, Quality Assurance, Entergy  
: [[contact::B. Finn]], Director, Nuclear Safety Assurance
: [[contact::B. Finn]], Director, Nuclear Safety Assurance  
: [[contact::D. Koelbel]], Sr. Engineer, Fire Protection
: [[contact::D. Koelbel]], Sr. Engineer, Fire Protection
: [[contact::G. Sullivan]], Acting Manager, Security
: [[contact::G. Sullivan]], Acting Manager, Security  
: [[contact::J. Pechacek]], Manager, Licensing
: [[contact::J. Pechacek]], Manager, Licensing  
: [[contact::D. Poulin]], Manager, System Engineering
: [[contact::D. Poulin]], Manager, System Engineering
: [[contact::T. Raymond]], Manager, Project Management
: [[contact::T. Raymond]], Manager, Project Management
: [[contact::M. Reno]], Manager, Maintenance
: [[contact::M. Reno]], Manager, Maintenance
: [[contact::P. Scanlan]], Manager, Programs and Components Engineering
: [[contact::P. Scanlan]], Manager, Programs and Components
: [[contact::E. Wolf]], Manager, Radiation Protection
Engineering
: [[contact::E. Wolf]], Manager, Radiation
Protection
: [[contact::M. Woodby]], Director, Engineering
: [[contact::M. Woodby]], Director, Engineering
==LIST OF ITEMS==
==LIST OF ITEMS==
OPEN, CLOSED, AND DISCUSSEDOpened05000333/2011004-01Closed05000333/201 1 002-00Unplanned Power Reduction Pl ReportingFailure to lsolate the Reactor BuildingResults in a Condition Prohibited byTechnica I SpecificationsURILERDiscussedNoneAttachment
OPEN, CLOSED, AND DISCUSSED
A-2
===Opened===
==LIST OF DOCUMENTS REVIEWED==
: 05000333/2011004-01
==Section 1R01: Adverse Weather ProtectionProcedures:AOP-13, "High Winds, Hurricanes and Tornadoes," Revision 13Section 1R04: Equipment AliqnmentOP-13, "Residual Heat Removal System," Revision 95OP-33, "Fire Protection", Revision 54;OP-14, "Core Spray System," Revision 33Section 1R05: Fire ProtectionProcedures:PFP-PWR29, "switchgear Room-EasUElev. 272' Fire ArealZone lllSW-2," Revision 2PFP-PWR3O, "switchgear Room-WesVElev. 272' Fire ArealZone==
 
: IC/SW-1," Revision 2PFP-PWR31, "Emergency Diesel Generator Spaces-South/Elev. 272'Fire ArealZone V/EG-1,EG-2. EG-s," Revision 2OP-60, "Diesel Generator Room Ventilation," Revision 8;PFP-PWR14, "Crescent Area-easU Elevation 227' , 242' Fire ArealZone XVll/RB-1E," Revision 3PFP-PWR33, "Pump Rooms (Screenwell)/Elev. 255' Fire Area/Zone Xll/SP-1, Xlll/SP-2, lB/FP-1,FP-3,'Revision 1Documents:JAF-RPT-O4-00478, "JAF Fire Hazards Analysis," Revision 2DBD-076 TAB lX, "Design Basis Document for Fire Protection, System Safe Shutdown," Revision5JAF-ANAL-FPS-01139, "Fire Barrier Analysis, Various Unsealed Penetrations from Crescentsand Main Steam Tunnel to Torus," Revision 2
===Closed===
: 05000333/201  
: 002-00 Unplanned
: Power Reduction  
: Pl Reporting Failure to lsolate the Reactor Building Results in a Condition  
: Prohibited
by Technica I Specifications
: URI LER
===Discussed===
None Attachment
 
==LIST OF DOCUMENTS==
REVIEWED Section 1R01: Adverse Weather Protection Procedures:
: AOP-13, "High Winds, Hurricanes and Tornadoes," Revision 13
 
==Section 1R04: Equipment==
: Aliqnment
: OP-13, "Residual Heat Removal System," Revision 95
: OP-33, "Fire Protection", Revision 54;OP-14, "Core Spray System," Revision 33 Section 1R05: Fire Protection Procedures:
: PFP-PWR29, "switchgear Room-EasUElev.
: 2' Fire ArealZone lllSW-2," Revision 2
: PFP-PWR3O, "switchgear Room-WesVElev.
: 2' Fire ArealZone  
: IC/SW-1," Revision 2
: PFP-PWR31, "Emergency Diesel Generator Spaces-South/Elev.
: 2'Fire ArealZone  
: V/EG-1,
: EG-2. EG-s," Revision 2
: OP-60, "Diesel Generator Room Ventilation," Revision 8;PFP-PWR14, "Crescent Area-easU  
: Elevation  
: 27' , 242' Fire ArealZone  
: XVll/RB-1E," Revision 3
: PFP-PWR33, "Pump Rooms (Screenwell)/Elev.
: 255' Fire Area/Zone Xll/SP-1, Xlll/SP-2, lB/FP-1,
: FP-3,'Revision Documents:
: JAF-RPT-O4-00478, "JAF Fire Hazards Analysis," Revision 2
: DBD-076 TAB lX, "Design Basis Document for Fire Protection, System Safe Shutdown," Revision 5
: JAF-ANAL-FPS-01139, "Fire Barrier Analysis, Various Unsealed Penetrations from Crescents and Main Steam Tunnel to Torus," Revision 2


==Section 1R06: Flood Protection MeasuresProcedures:EN-DC-346, "Cable Reliability Program," Revision 2Condition Reports:CR-JAF-2o11-04407CR-JAF-201144892CR-JAF-2011-04897Work Orders:52285065-01Attachment==
==Section 1R06: Flood Protection==
: A-3
: Measures Procedures:
: EN-DC-346, "Cable Reliability Program," Revision 2 Condition Reports: CR-JAF-2o11-04407
: CR-JAF-201144892
: CR-JAF-2011-04897
: Work Orders: 52285065-01


==Section 1R11: Licensed Operator Requalification ProqramProcedures:AOP-41, "Feedwater Malfunction," Revision 9EOP-2, "RPV Control," Revision 9EOP-3, "Failure to Scram," Revision 9EOP-3A, "Failure to Scram -==
==Section 1R11: Licensed Operator Requalification==
: ED," Revision 2EOP-4, "Primary Containment Control," Revision I
: Proqram Procedures:
: AOP-41, "Feedwater Malfunction," Revision 9
: EOP-2, "RPV Control," Revision 9
: EOP-3, "Failure to Scram," Revision 9
: EOP-3A, "Failure to Scram - ED," Revision 2
: EOP-4, "Primary Containment Control," Revision I


==Section 1R12: Maintenance EffectivenessProcedures:EN-DC-203, "Maintenance Rule Program", Revision 1EN-DC-204, "Maintenance Rule Scope and Basis," Revision 2EN-DC-205, "Maintenance Rule Monitoring", Revision 3EN-DC-206, "Maintenance Rule (aX1) Process," Revision 1OP-25, "Control Rod Drive Hydraulic System", Revision 80ST-8Q, "Testing of the Emergency Service Water System", Revision 41Documents:JAF-RPT-CRD-02493, "Maintenance Rule Basis Document System 003 Control Rod DriveHydraulic System", Revision 8System Health Report, Control Rod Drive Hydraulic System, 2na Quarter,2Ol1JAF-RPT-MULTI-02294, "Maintenance Rule Basis Document for Service Water SystemsIncluding Sysetm 10 (RHR==
==Section 1R12: Maintenance==
: SW), 46 (Normal SW), and 46-ESW (Emergency SW)," Revision10System Health Report, Emergency Service Water System, 2no Quarter, 2Q11Quarterly SLC system health reports for second quarter 2010 through second quarter 2011JAF-RPT-SLC-O2282, "Maintenance Rule Basis Document System 11, Standby Liquid Control,"Revision 6JENG-APL-11-OO2, "Maintenance Rule (aX1) Action Plan, System 1 1 Standby Liquid Control,"Revision 1Condition Reports:cR-JAF-2007-00625cR-JAF-2009-03994CR-JAF-2O10-00894CR-JAF-2O10-02557CR-JAF-201 1-00894
: Effectiveness Procedures:
: EN-DC-203, "Maintenance Rule Program", Revision 1
: EN-DC-204, "Maintenance Rule Scope and Basis," Revision 2
: EN-DC-205, "Maintenance Rule Monitoring", Revision 3
: EN-DC-206, "Maintenance Rule (aX1) Process," Revision 1
: OP-25, "Control Rod Drive Hydraulic System", Revision 80
: ST-8Q, "Testing of the Emergency Service Water System", Revision 41 Documents:
: JAF-RPT-CRD-02493, "Maintenance Rule Basis Document System 003 Control Rod Drive Hydraulic System", Revision 8 System Health Report, Control Rod Drive Hydraulic System, 2na Quarter,2Ol1
: JAF-RPT-MULTI-02294, "Maintenance Rule Basis Document for Service Water Systems Including Sysetm 10 (RHR SW), 46 (Normal SW), and 46-ESW (Emergency  
: SW)," Revision 10 System Health Report, Emergency Service Water System, 2no Quarter, 2Q11 Quarterly
: SLC system health reports for second quarter 2010 through second quarter 2011
: JAF-RPT-SLC-O2282, "Maintenance Rule Basis Document System 11, Standby Liquid Control," Revision 6
: JENG-APL-11-OO2, "Maintenance Rule (aX1) Action Plan, System 1 1 Standby Liquid Control," Revision 1 Condition Reports: cR-JAF-2007-00625
cR-JAF-2009-03994
: CR-JAF-2O10-00894
: CR-JAF-2O10-02557
: CR-JAF-201  
: 1-00894


==Section 1R13: Maintenance Risk Assessments and Emerqent Work ControlProcedures:AP-05.13, "Maintenance During==
==Section 1R13: Maintenance==
: LCOs," Revision 10AP-10.10, "On-Line Risk Assessment," Revision 7EN-WM-104,"On Line Risk Assessment," Revision 4Attachment
: Risk Assessments and Emerqent Work Control Procedures:
: A-4Section 1 R15: Operabilitv EvaluationsProcedures:EN-LI-102, "Corrective Action Process," Revision 16EN-OP-1 04, "Operabitity Determination Process," Revision 5ISP-104A, "RPS Reactor Pressure Instrument Response Time Test (ATTS)", Revision 0
: AP-05.13, "Maintenance During LCOs," Revision 10
: AP-10.10, "On-Line Risk Assessment," Revision 7
: EN-WM-104,"On Line Risk Assessment," Revision 4 Attachment Section 1 R15: Operabilitv Evaluations Procedures:
: EN-LI-102, "Corrective Action Process," Revision 16
: EN-OP-1 04, "Operabitity Determination Process," Revision 5
: ISP-104A, "RPS Reactor Pressure Instrument Response Time Test (ATTS)", Revision 0


==Section 1R18: Plant ModificationsEN-DC-1 36, "Temporary Modifications," Revision 6EN-DC-115, "Engineering Change Process," Revision 10EN-DC-1 17, "Post Modification Testing and Special Instructions," Revision 4Documents:EC 15347 , "lnstall Pomana Type Test Jacks in Panels 09-15, 09-17 for==
==Section 1R18: Plant Modifications==
: RPS Test Box Use"EC 25477, "Recirc Tach Generator 02-184P-1A (TACH) 1 15V Output Acceptance"EC 25480, "Recirc Tach Generator 02-184P-1B (TACH) 115V Output Acceptance"
: EN-DC-1 36, "Temporary Modifications," Revision 6
: EN-DC-115, "Engineering Change Process," Revision 10
: EN-DC-1 17, "Post Modification Testing and Special Instructions," Revision 4 Documents:
: EC 15347 , "lnstall Pomana Type Test Jacks in Panels 09-15, 09-17 for RPS Test Box Use"
: EC 25477, "Recirc Tach Generator  
: 2-184P-1A (TACH) 1 15V Output Acceptance"
: EC 25480, "Recirc Tach Generator  
: 2-184P-1B (TACH) 115V Output Acceptance"


==Section 1R19: Post Maintenance TestinoProcedures:ST-1MA, "A==
==Section 1R19: Post Maintenance==
: MCLCS Valve Exercise (lST)", Revision 1ISP-104A, "RPS Reactor Pressure lnstrument Response Time Testing (ATTS)," Revision 0ARP 09-5-2-60, "ATTS RPS Div 81 or 82 Gross Fail or TU Inop," Revision 3ISP-17581, "Reactor and Containment Cooling Instrument Functional Test/Calibration (ATTS),"Revision 16OP-14, "Core Spray System," Revision 33IPS-150A, "RCIC Auto lsolation lnstrument Function TesV Calibration (ATTS)," Revision 34
: Testino Procedures:
: ST-1MA, "A MCLCS Valve Exercise (lST)", Revision 1
: ISP-104A, "RPS Reactor Pressure lnstrument Response Time Testing (ATTS)," Revision 0
: ARP 09-5-2-60, "ATTS RPS Div 81 or 82 Gross Fail or TU Inop," Revision 3
: ISP-17581, "Reactor and Containment Cooling Instrument Functional Test/Calibration (ATTS)," Revision 16
: OP-14, "Core Spray System," Revision 33
: IPS-150A, "RCIC Auto lsolation lnstrument Function TesV Calibration (ATTS)," Revision 34


==Section 2RS1: Radioloqical Hazard Assessment and Exposure ControlsProcedures:EN-RP-121, "Radioactive Material Control," Revision. 6,EN-RP-101, "Access Control for Radiologically Controlled Areas," Revision 6EN-RP-131, "Air Sampling," Revision. 8Documents:Quality Assurance Audit Report No.==
==Section 2RS1: Radioloqical==
: QA-14-2009-JAF-1, "Radiation Protection"Quality Assurance Audit Report No.
: Hazard Assessment and Exposure Controls Procedures:
: QA-14/15-2009-JAF-1, "Radiation Protection / Radwaste"Condition Reports:CR-JAF-2o11-01925CR-JAF-2o11-02747CR-JAF-2o1
: EN-RP-121, "Radioactive Material Control," Revision.
: 1-03645CR-JAF-201
: 6,
: 1-08585CR-JAF-2O11-02007CR-JAF-2O1
: EN-RP-101, "Access Control for Radiologically Controlled Areas," Revision 6
: 1-03076CR-JAF-2o1
: EN-RP-131, "Air Sampling," Revision.
: 1-03905CR-JAF-2O11-02394CR-JAF-2o11-03154CR-JAF-2011-04367CR-JAF-2o11-02608CR-JAF-2O1
: Documents:
: 1-03350cR-JAF-2O11-04455Attachment
: Quality Assurance Audit Report No.
: A-5
: QA-14-2009-JAF-1, "Radiation Protection" Quality Assurance Audit Report No.
: QA-14/15-2009-JAF-1, "Radiation Protection  
/ Radwaste" Condition Reports: CR-JAF-2o11-01925
: CR-JAF-2o11-02747
: CR-JAF-2o1
: 1-03645
: CR-JAF-201
: 1-08585 CR-JAF-2O11-02007
: CR-JAF-2O1
: 1-03076
: CR-JAF-2o1
: 1-03905 CR-JAF-2O11-02394
: CR-JAF-2o11-03154
: CR-JAF-2011-04367
: CR-JAF-2o11-02608
: CR-JAF-2O1
: 1-03350 cR-JAF-2O11-04455


==Section 2RS4: Occupational Dose AssessmentDocuments:NVLAP On-Site Assessment Report for Landauer, lnc., May 2010Personnel Dosimetry Performance Testing Conducted for==
==Section 2RS4: Occupational==
: NVLAP at Pacific Northwest NationalLaboratory for Landauer, Inc., May 2010
: Dose Assessment Documents:
: NVLAP On-Site Assessment Report for Landauer, lnc., May 2010 Personnel Dosimetry Performance Testing Conducted for NVLAP at Pacific Northwest National Laboratory for Landauer, Inc., May 2010


==Section 2RSS: Radiation Monitorinq InstrumentationProcedures:RP-INST-02.04,"Count Rate Meter, Ludlum Model 177," Revision 6RP-INST-02.06, "Dose Rate Meter, Bicron Micro-Rem," Revision 3RP-iNST-02.08, "lon Chamber Dose Rate Meter," Revision 4RP-INST-03.01, "Area Radiation Monitors," Revision 3RP-INST-03.03, "Containment Radiation Monitor System Response Test and PreplannedAlternate Monitoring Method," Revision 9RP-INST-03.04, "PASS Radiation Monitor," Revision 2RP-I==
==Section 2RSS: Radiation==
: NST-0 4.01, " Area Radiation Mon itor, Dosimeter Corporation," Revision 5RP-INST-04.02,"Whole Body Contamination Monitor lPM," Revision 6EN-RP-308, "SmallArticles Monitor (SAM) Model 9," Revision 4RP-INST-04.08, "MGPI Telepole WR Extendable GM Survey Meter," Revision 4EN-RP-306 , "PM-7 Portal Monitor," Revision 2RP-INST-05.02, "Electrometer, Victoreen Model 500," Revision 1SP-03.01, "Main Steam Line and SJAE Radiation Monitor Calibration," Revision 13SP-03.08, "HR High Range Effluent Monitors," Revision 0SP-03.08RW, "Radwaste Bldg Gaseous Effluent Monitors Monitor," Revision 1SP-03.07, "Liquid Process Radiation Monitors," Revision 6IMP-17 .2, "Process Radiation Monitoring System Liquid Process Radiation MonitorsTesVCalibration," Revision 1 5IMP-17 .12, "VenIilation Radiation Monitor Removal/Return to service for Preventive MaintenanceActivities," Revision 14ISP-17-4A, "Dry Well Continuous Atmospheric Monitoring System," Revision 1ISP-17-48, "Dry Well Continuous Atmospheric Monitoring System," Revision 1ISP-26A, "Radwaste Bldg. Exhaust Radiation Monitor ChannelA Functional TesUCalibration,"Revision'lInstrument Calibrations Reviewed:Model
: Monitorinq Instrumentation Procedures:
: RP-INST-02.04,"Count Rate Meter, Ludlum Model 177," Revision 6
: RP-INST-02.06, "Dose Rate Meter, Bicron Micro-Rem," Revision 3 RP-iNST-02.08, "lon Chamber Dose Rate Meter," Revision 4
: RP-INST-03.01, "Area Radiation Monitors," Revision 3
: RP-INST-03.03, "Containment Radiation Monitor System Response Test and Preplanned Alternate Monitoring Method," Revision 9
: RP-INST-03.04, "PASS Radiation Monitor," Revision 2
: RP-I
: NST-0 4.01, " Area Radiation Mon itor, Dosimeter Corporation," Revision 5
: RP-INST-04.02,"Whole Body Contamination Monitor lPM," Revision 6
: EN-RP-308, "SmallArticles Monitor (SAM) Model 9," Revision 4
: RP-INST-04.08, "MGPI Telepole WR Extendable  
: GM Survey Meter," Revision 4
: EN-RP-306 , "PM-7 Portal Monitor," Revision 2
: RP-INST-05.02, "Electrometer, Victoreen Model 500," Revision 1
: SP-03.01, "Main Steam Line and SJAE Radiation Monitor Calibration," Revision 13
: SP-03.08, "HR High Range Effluent Monitors," Revision 0
: SP-03.08RW, "Radwaste Bldg Gaseous Effluent Monitors Monitor," Revision 1
: SP-03.07, "Liquid Process Radiation Monitors," Revision 6
: IMP-17 .2, "Process Radiation Monitoring System Liquid Process Radiation Monitors TesVCalibration," Revision 1 5
: IMP-17 .12, "VenIilation Radiation Monitor Removal/Return to service for Preventive Maintenance Activities," Revision 14
: ISP-17-4A, "Dry Well Continuous Atmospheric Monitoring System," Revision 1
: ISP-17-48, "Dry Well Continuous Atmospheric Monitoring System," Revision 1
: ISP-26A, "Radwaste Bldg. Exhaust Radiation Monitor ChannelA Functional TesUCalibration," Revision'l Instrument Calibrations Reviewed: Model
: RO-20 lon Chamber Survey Meter: #1A0 -
: RO-20 lon Chamber Survey Meter: #1A0 -
: 313111; #1107 -
: 313111; #1107 -
: 4111111; #1116 - 10/5110;#1118 - 1015110: #1110 - 12113110Bicron Micro-Rem:#546 - 1Ol28l1Q;#543 -
: 4111111; #1116 - 10/5110;#1118 - 1015110: #1110 -
: 417110;#544 - 4l7l1OLudlum Model 177: #348 -
: 12113110 Bicron Micro-Rem:#546 - 1Ol28l1Q;#543 -
: 6128111; #366 - 6/29111Post Accident Sampling System Radiation Monitor: #Rl-507 & #Rl-665 - 416111Area Radiation Monitor: #19 -
: 417110;#544 - 4l7l1O Ludlum Model 177: #348 -
: 6128111; #366 - 6/29111 Post Accident Sampling System Radiation Monitor: #Rl-507 & #Rl-665 -
: 416111 Area Radiation Monitor: #19 -
: 3114111; #24 -
: 3114111; #24 -
: 1212110; #26 -
: 1212110; #26 -
: 11122110; #30 - 913110MGPI Telepole WR Extendable GM Survey Meter: #11694 -
: 11122110;  
: 3129111; #16 - 2118111PM-7 Portal Monitor: #733 - 12111109Main Steam Line and SJAE Radiation Monitors: 17RM-150A - 8120108: 17RM-1508 - 8130110High Range Effluent Monitors: 17RM-53A -
#30 -
: 12115109;17RM-53B - 918109Radwaste Building Gaseous Effluent Monitors: 17RM-458A - 8l25l1O;17RM-4588 - 3/16/10Liquid Process Radiation Monitors: 17RM-351 -
: 913110 MGPI Telepole WR Extendable  
: 8125110; 17RM-350 - 9111110Attachment
: GM Survey Meter: #11694 -
: A-6Process Radiation Monitoring System Liquid Process Radiation Monitors: 17RM-350 -611110;17RM-351 -
: 3129111; #16 -
: 611110; 17RM-352 - 611110Ventilation Radiation Monitor: 17RM-4528 - 1119111DryWell Continuous Atmospheric Monitoring System: 17RM-102A-617111; 17RM-103A -
: 2118111
: PM-7 Portal Monitor: #733 -
: 12111109 Main Steam Line and SJAE Radiation Monitors:
: 17RM-150A - 8120108: 17RM-1508 -
: 8130110 High Range Effluent Monitors:
: 17RM-53A -
: 12115109;17RM-53B -
: 918109 Radwaste Building Gaseous Effluent Monitors:
: 17RM-458A - 8l25l1O;17RM-4588 - 3/16/10 Liquid Process Radiation Monitors:
: 17RM-351 -
: 8125110; 17RM-350 -
: 9111110 Attachment Process Radiation Monitoring System Liquid Process Radiation Monitors:
: 17RM-350 -611110;17RM-351 -
: 611110; 17RM-352 -
: 611110 Ventilation Radiation Monitor: 17RM-4528 -
: 1119111 DryWell Continuous Atmospheric Monitoring System: 17RM-102A-617111;  
: 17RM-103A -
: 617111;17RM-102B -
: 617111;17RM-102B -
: 619111; 17RM-1038 - 619111Radwaste Building, Exhaust Radiation Monitor ChannelA FunctionalTest/Calibration: 17RM-458A - 514111Post Accident Containment High Range Radiation Monitors: 27RM-104A -
: 619111; 17RM-1038 -
: 12111109;27RM-1048 - 911110Condition Reports:CR-JAF-2010-00508CR-JAF-2010-01 156cR-JAF-2010-01893CR-JAF-2010-02130CR-JAF-2010-02301CR-JAF-2O10-02500cR-JAF-2o10-02702CR-JAF-2010-02764CR-JAF-2010-02988CR-JAF-2o10-03090CR-JAF-2O10-03180cR-JAF-2010-03341CR-JAF-2o10-03411CR-JAF-2010-03680CR-JAF-2o10-03989CR-JAF-2010-04003CR-JAF-2O10-04018CR-JAF-2010-04858CR-JAF-2010-05246CR-JAF-2O10-05534CR-JAF-2O10-05688cR-JAF-2O10-05887cR-JAF-2O10-07300cR-JAF-2o10-0797 4CR-JAF-2010-08564CR-JAF-2O1
: 619111 Radwaste Building, Exhaust Radiation Monitor ChannelA FunctionalTest/Calibration:
: 1-00063CR-JAF-201
: 17RM-458A -
: 1-00873CR-JAF-2O1 1-01960cR-JAF-2O11-02533CR-JAF-2011-02851
: 514111 Post Accident Containment High Range Radiation Monitors:
: 27RM-104A -
: 12111109;27RM-1048 -
: 911110 Condition Reports: CR-JAF-2010-00508
: CR-JAF-2010-01  
: 156 cR-JAF-2010-01893
: CR-JAF-2010-02130
: CR-JAF-2010-02301
: CR-JAF-2O10-02500
cR-JAF-2o10-02702
: CR-JAF-2010-02764
: CR-JAF-2010-02988
: CR-JAF-2o10-03090
: CR-JAF-2O10-03180
cR-JAF-2010-03341
: CR-JAF-2o10-03411
: CR-JAF-2010-03680
: CR-JAF-2o10-03989
: CR-JAF-2010-04003
: CR-JAF-2O10-04018
: CR-JAF-2010-04858
: CR-JAF-2010-05246
: CR-JAF-2O10-05534
: CR-JAF-2O10-05688
cR-JAF-2O10-05887
cR-JAF-2O10-07300
cR-JAF-2o10-0797  
: CR-JAF-2010-08564
: CR-JAF-2O1
: 1-00063
: CR-JAF-201
: 1-00873
: CR-JAF-2O1
: 1-01960 cR-JAF-2O11-02533
: CR-JAF-2011-02851


==Section 2RS7: Radioloqical Environmental Monitorinq ProqramProcedures:SP-04.09, "Environmental Radiological Sample and Land Use Survey Data Collection," Revision2DVP-04.01, "JAF Environmental Laboratory Quality Assurance/Quality Control Program,"Revision 4AM-03.03, "Air Particulate Filter Analysis for Gross Beta," Revision 3AM-03.04, "Radioiodine Cartridge Analysis Using Gamma Spectroscopy," Revision 1AM-04.04, "Tritium Analysis of Water Samples," Revision 10Documents:EA Science and Technology 2010 Nearest Resident CensusEA Science and Technology 2010 Mitk Animal CensusEA Science and Technology 2010 Garden CensusJAFLO-2009-0089, "RETS/ODCM Radiological EffluentsOrganization Condition Report"Focused Assessment LearningQuality Assu ra nce Aud it Repo ft==
==Section 2RS7: Radioloqical==
: QA-21 6-2009-JAF- 1, " Chem istry,Effluents. and EnvironmentalMonitoring"JAF NPP Environmental Laboratory Quality Assurance Report, January 1 through December 31,2010EN-CY-102, "Entergy Nuclear Management Manual, Laboratory Analytical Quality Control,"Revision 3Tektronix Certificates of Calibration for Flow Meter Model
: Environmental Monitorinq Proqram Procedures:
: AC-250, Numbers 10452, 10436,12055, 10434, 10872, 10873, 10889, 10871, and 10698James A. FitzPatrick (JAF) Nuclear Power Plant Annual Radiological Environmental OperationsReport, January 1 - December 31, 2010Attachment
: SP-04.09, "Environmental Radiological Sample and Land Use Survey Data Collection," Revision 2
: A-7DVP-O1.02, "Offsite Dose Calculation Manual," Revision 11Selected 2011 Monthly Environmental Sample Results: Milk (April and June); Canal Water(March); Air (April)AREVA Environmental Laboratory QA Snapshot Self-Assessment, November 2009
: DVP-04.01, "JAF Environmental Laboratory Quality Assurance/Quality Control Program," Revision 4
: AM-03.03, "Air Particulate Filter Analysis for Gross Beta," Revision 3
: AM-03.04, "Radioiodine Cartridge Analysis Using Gamma Spectroscopy," Revision 1
: AM-04.04, "Tritium Analysis of Water Samples," Revision 10 Documents:
: EA Science and Technology  
: 2010 Nearest Resident Census EA Science and Technology  
: 2010 Mitk Animal Census EA Science and Technology  
: 2010 Garden Census
: JAFLO-2009-0089, "RETS/ODCM  
: Radiological Effluents Organization Condition Report" Focused Assessment Learning Quality Assu ra nce Aud it Repo ft
: QA-21 6-2009-JAF-  
: 1, " Chem istry, Effluents.
and Environmental Monitoring" JAF NPP Environmental Laboratory Quality Assurance Report, January 1 through December 31, 2010
: EN-CY-102, "Entergy Nuclear Management Manual, Laboratory Analytical Quality Control," Revision 3 Tektronix Certificates of Calibration for Flow Meter Model
: AC-250, Numbers 10452, 10436, 12055, 10434, 10872, 10873, 10889, 10871, and 10698 James A. FitzPatrick (JAF) Nuclear Power Plant Annual Radiological Environmental Operations Report, January 1 - December 31, 2010 Attachment
: DVP-O1.02, "Offsite Dose Calculation Manual," Revision 11 Selected 2011 Monthly Environmental Sample Results: Milk (April and June); Canal Water (March); Air (April)AREVA Environmental Laboratory  
: QA Snapshot Self-Assessment, November 2009


==Section 4OA2: ldentification and Resolution of ProblemsProcedures:EN-Ll-102, "Corrective Action Process," Revision 16EN-Ll-119, "Apparent Cause Evaluation (ACE) Process," Revision 11EN-LI-1 19-01, "Equipment Failure Evaluation," Revision 0EN-FAP-OP-006, "Operator Aggregate lmpact Index Performance Indicator," Revision 0EN-OP-1 lT, "Operations Assessments," Revision 3Condition Reports:CR-JAF-2o1==
==Section 4OA2: ldentification==
: 1-03394CR-JAF-201
: 1-03453CR-JAF-2011-03462CR-JAF-2o11-03491CR-JAF-2011-03517CR-JAF-2011-03557CR-JAF-201
: 1-03699CR-JAF-2O10-04912Work Orders:00'16814500260441002625580026991 90028887100226615002538820025410700254293


==Section 4OA5: Other ActivitiesProcedures:CR-JAF-20 1==
and Resolution of Problems Procedures:
: 1-03772CR-JAF-2O1
: EN-Ll-102, "Corrective Action Process," Revision 16
: 1-03846CR-JAF-2O1
: EN-Ll-119, "Apparent Cause Evaluation (ACE) Process," Revision 11
: 1-03889CR-JAF-201
: EN-LI-1 19-01, "Equipment Failure Evaluation," Revision 0
: 1-04056CR-JAF-201
: EN-FAP-OP-006, "Operator Aggregate lmpact Index Performance Indicator," Revision 0
: 1-04090CR-JAF-2011-04144CR-JAF-2O11-0420800254824002551 0800255131002560500025776700258129002587930025920800261300CR-JAF-2o11-04367cR-JAF-zo11-Q4378QR-JAF-2o11-Q4411CR-JAF-2O11-04470cR-JAF-2o11-04510CR-JAF-2011-04736CR-JAF-2O11-0489700263097002668230027149800290608002906095110140151101426RT-04.14, "Non-REMP Thermoluminescent Dosimetry (TLD) Program," Revision 3RP-OPS-0B.01, "Routine Surveys and lnspections," Revision 18Attachment
: EN-OP-1 lT, "Operations Assessments," Revision 3 Condition Reports:
: A-8
: CR-JAF-2o1
: 1-03394
: CR-JAF-201
: 1-03453 CR-JAF-2011-03462
: CR-JAF-2o11-03491
: CR-JAF-2011-03517
: CR-JAF-2011-03557
: CR-JAF-201
: 1-03699 CR-JAF-2O10-04912
: Work Orders: 00'168145
: 00260441
: 00262558
: 0026991 9
: 00288871
: 00226615
: 00253882
: 00254107
: 00254293 Section 4OA5: Other Activities Procedures:
: CR-JAF-20
: 1-03772
: CR-JAF-2O1
: 1-03846
: CR-JAF-2O1
: 1-03889
: CR-JAF-201
: 1-04056
: CR-JAF-201
: 1-04090 CR-JAF-2011-04144
: CR-JAF-2O11-04208
: 254824
: 002551 08
: 00255131
: 00256050
: 00257767
: 00258129
: 00258793
: 00259208
: 00261300 CR-JAF-2o11-04367
cR-JAF-zo11-Q4378
: QR-JAF-2o11-Q4411
: CR-JAF-2O11-04470
cR-JAF-2o11-04510
: CR-JAF-2011-04736
: CR-JAF-2O11-04897
: 263097
: 00266823
: 00271498
: 00290608
: 00290609
: 51101401
: 51101426
: RT-04.14, "Non-REMP  
: Thermoluminescent Dosimetry (TLD) Program," Revision 3
: RP-OPS-0B.01, "Routine Surveys and lnspections," Revision 18 Attachment
==LIST OF ACRONYMS==
==LIST OF ACRONYMS==
ACE apparent cause evaluationADAMS Agencywide Documents Access and Management SystemATWS anticipated transient without scramCAM continuous atmospheric monitoringCAP corrective action programCDI condensate demineralizer influentCFR Code of Federal RegulationsCR condition reportCST condensate storage tankDBD design basis documentEC engineering changeEDG emergency diesel generatorEntergy Entergy Nuclear NortheastESOMS electronic shift operations management systemESW emergency service wateroF FahrenheitFitzPatrick James
: [[ACE]] [[apparent cause evaluation]]
: [[A.]] [[FitzPatrick Nuclear Power Plant]]
ADAMS Agencywide
HRA high radiation areaISFSI independent spent fuel storage installationIMC inspection manual chapterIST inservice testkV kilovoltLCO limiting condition for operationLER licensee event reportLPSI low pressure safety injectionMOV motor operated valveNCV non-cited violationNEI Nuclear Energy InstituteNIST National Institute of Standards and TechnologyNRC Nuclear Regulatory CommissionNVLAP nationalvoluntarylaboratoryaccreditationprogramODCM offsite dose calculation manualODMI operational decision-making issuePARS Publicly Available RecordPMT post-maintenance testingRB reactor buildingRBVS reactor building ventilation systemRCIC reactor core isolation coolingRCS reactor coolant systemREMP radiological environmental monitoring programRHR residual heat removalRPS reactor protection systemRWP radiation work permitSGT standby gas treatmentSJAE steam jet air ejectorSLC standby liquid controlSSC structure, system, or componentAttachment
Documents
: [[STTBTL]] [[DTSUFSARURIVHRAWOA-9surveillance testturbine buildingthermoluminescent dosimetertech nical specificationupdated final safety analysis reportunresolved itemvery high radiation areawork orderAttachment]]
Access and Management
System ATWS anticipated
transient
without scram CAM continuous
atmospheric
monitoring
CAP corrective
action program CDI condensate
demineralizer
influent
: [[CFR]] [[Code of Federal Regulations]]
CR condition
report CST condensate
storage tank
: [[DBD]] [[design basis document]]
EC engineering
change EDG emergency
diesel generator Entergy Entergy Nuclear Northeast ESOMS electronic
shift operations
management
system ESW emergency
service water oF Fahrenheit
FitzPatrick
James A. FitzPatrick
Nuclear Power Plant HRA high radiation
area ISFSI independent
spent fuel storage installation
IMC inspection
manual chapter IST inservice
test kV kilovolt LCO limiting condition
for operation
: [[LER]] [[licensee event report]]
: [[LPSI]] [[low pressure safety injection]]
: [[MOV]] [[motor operated valve]]
NCV non-cited
violation
: [[NEI]] [[Nuclear Energy Institute]]
NIST National Institute
of Standards
and Technology
NRC Nuclear Regulatory
Commission
: [[NVLAP]] [[nationalvoluntarylaboratoryaccreditationprogram]]
ODCM offsite dose calculation
manual ODMI operational
decision-making
issue PARS Publicly Available
Record PMT post-maintenance
testing
: [[RB]] [[reactor building]]
RBVS reactor building ventilation
system RCIC reactor core isolation
cooling
: [[RCS]] [[reactor coolant system]]
REMP radiological
environmental
monitoring
program
: [[RHR]] [[residual heat removal]]
RPS reactor protection
system RWP radiation
work permit
: [[SGT]] [[standby gas treatment]]
: [[SJAE]] [[steam jet air ejector]]
: [[SLC]] [[standby liquid control]]
: [[SSC]] [[structure, system, or component Attachment]]
: [[ST]] [[]]
: [[TB]] [[]]
: [[TLD]] [[]]
: [[TS]] [[]]
: [[UFSAR]] [[]]
: [[URI]] [[]]
: [[VHRA]] [[]]
WO A-9 surveillance
test turbine building thermoluminescent
dosimeter tech nical specification
updated final safety analysis report unresolved
item very high radiation
area work order Attachment
}}
}}

Revision as of 12:53, 2 August 2018

IR 05000333-11-004, on 07/01.2011 - 09/30/2011, for James A. Fitzpatrick
ML11313A056
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 11/08/2011
From: Gray M K
Reactor Projects Branch 2
To: Michael Colomb
Entergy Nuclear Northeast
Mel Gray
References
IR-11-004
Download: ML11313A056 (38)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406.1415 November 8, zOLl Mr. Mike Colomb Site Vice President Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant P. O. Box 110 Lycoming, NY 13093

SUBJECT: JAMES A. FITZPATRICK NUCLEAR POWER PLANT - NRC INTEGRATED I NSPECTION REPORT 05000333/201 1004

Dear Mr. Colomb:

On September 30, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your James A. FitzPatrick Nuclear Power Plant (FitzPatrick).

The enclosed inspection report documents the inspection results which were discussed on October 19, 2011, with Mr. Brian R. Sullivan and other members of your staff.The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified.

However, a licensee-identified violation which was determined to be of very low safety significance is listed in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section Vl.A.1 of the NRC Enforcement Policy because of the very low safety significance of the violation and because it is entered into your corrective action program. lf you contest this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis ior your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region l; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident lnspector at FitzPatrick. ln accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/st l //rurt ,/rl ^*7 Mel Gray, Chief (Projects Branch 2 Division of Reactor Projects Docket No.: 50-333 License No.: DPR-59

Enclosure:

Inspection Report05000333/20110Q4

w/Attachment:

Supplemental I nformation cc Mencl: Distribution via ListServ

SUMMARY OF FINDINGS

lR 0500033312011004;07lQ112011 - 0913012011;

James A. FitzPatrick Nuclear Power Plant;Routine Resident Integrated Report.The report covered a three-month period of inspection by resident inspectors and announced inspections performed by regional inspectors.

The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006,

Other Findings

A violation of very low safety significance that was identified by Entergy personnel was reviewed by the inspectors.

Corrective actions taken or planned by Entergy personnel have been entered into Entergy's corrective action program (CAP). This violation and corrective action tracking number are listed in Section 4OA7 of this report.Enclosure 4

REPORT DETAILS

Summarv of Plant Status The James A. FitzPatrick Nuclear Power Plant (FitzPatrick)began the inspection period operating at 100 percent reactor power. On September 28, 2011, power was reduced to 65 percent to perform a control rod sequence exchange, single control rod scram time testing and blade interference monitoring, main condenser water box back washing, and turbine valve testing. Operators restored power to 100 percent the following day. The plant continued to operate at or near full power for the remainder of the inspection period.1. REACTORSAFETY Gornerstones:

lnitiating Events, Mitigating Systems, and Barrier lntegrity 1R01 Adverse Weather Protection (71111.01 - 1 sample)a. lnspection Scope The inspectors reviewed FitzPatrick personnel's preparations in accordance with AOP-13, "High Winds, Hurricanes and Tornadoes," Revision 13, for potential high wind and heavy rain conditions associated with Hurricane lrene on August 28,2011. The inspectors reviewed the operating status of the reactor, reviewed the procedural limits and actions associated with high winds and hurricanes, and walked down accessible areas of the reactor building (RB) and turbine building (TB) to assess vulnerabilities to high winds and heavy rains. Walkdowns were also conducted in the emergency diesel generator (EDG), emergency service water (ESW), and screenhouse rooms. The inspectors reviewed conditions following the occurrence of the adverse weather to assess its impact. Documents reviewed for each section of this inspection report are listed in the Attachment.

These activities constituted one impending adverse weather conditions inspection sample.b. Findinqs No findings were identified.

1R04 Equipment

Aliqnment (71111.04)

.1 Quarterlv

Partial Svstem Walkdown (71111.04Q - 3 samples)a. Inspection Scope The inspectors performed three partial system walkdowns to verify the operability of redundant or diverse trains and components during periods of system train unavailability or following periods of maintenance.

The inspectors referenced system procedures, the updated final safety analysis report (UFSAR), and system drawings in order to verify the alignment of the available train was proper to support its required safety functions.

The i i Enclosure 5 inspectors also reviewed applicable condition reports (CRs) and work orders (WOs) to ensure that FitzPatrick personnel identified and properly addressed equipment discrepancies that could impair the capability of the available equipment train, as required by Title 10, Code of Federal Regulations (10 CFR) 50, Appendix B, Criterion XVl, "Corrective Action." The inspectors performed a partial walkdown of the following systems:. 'A' residual heat removal (RHR) system when the'B' RHR system was out of service for testing;. Diesel engine driven fire pump 76P-1 upon completion of post maintenance testing (PMT); and o 'A' core spray system while the 'B' core spray system was out of service for testing.These activities constituted three partial system walkdown inspection samples.b. Findinqs No findings were identified.

1R05 Fire Protection

(71111.05)

.1 Quarterlv

Review (71111.05Q - 5 samples)a. Inspection Scope The inspectors conducted inspections of fire areas to assess the material condition and operational status of fire protection features.

The inspectors verified, consistentwith applicable administrative procedures, that combustibles and ignition sources were adequately controlled; passive fire barriers, manual fire-fighting equipment, and suppression and detection equipment were appropriately maintained; and compensatory measures for out-of-service, degraded, or inoperable fire protection equipment were implemented in accordance with FitzPatrick's fire protection program. The inspectors evaluated the fire protection program for conformance with the requirements of license condition 2.C(3), "Fire Protection." o East switchgear room, fire arealzone ll/SW-2;o West switchgear room, fire arealzone lClSW-1;. 'A' and 'C' EDG rooms and switchgear room, fire arealzone V/EG-1 , EG-2, EG-5;. East crescent area, fire arealzone XVll/RB-1 E; and r North safety related pump room, fire arealzone Xltl/SP-2.

These activities constituted five quarterly fire protection inspection samples.b. Findinos No findings were identified.

6 1R06 Flood Protection Measures (71111.06 - 1 sample)a. lnspection Scope The inspectors examined manhole MH-7A in the 115 kilovolt (kV) switchyard, and MH-5A by main transformer T1A, during FitzPatrick personnel's annual inspection of yard manholes performed under WO 52285065-01.

These manholes contain non-safety class electrical cables that could affect the reliability of 1 15 kV offsite power. The inspectors also examined the condensate storage tank (CST) pit, which contains safety class instrument cables. The inspectors verified that cable insulation was not degraded and that cable support structures were adequate to maintain the integrity of the cables.The inspectors observed that the manholes were equipped with floatactuated sump pumps, but that there were no level indicators or alarms to alert operators to a pump failure. The inspectors noted that CR-JAF-2011-04407 documented sump pump issues that had been identified during the annual inspection, including excessive water accumulation in one manhole due to a stuck float actuator, and a failed sump pump in MH-7A. These conditions did not constitute violations of regulatory requirements because the affected manholes did not contain safety class electrical cables. The inspectors also noted that the CST pit is checked during daily operator rounds and therefore that the safety related cables were not likely to become submerged due to similar sump float issues.These activities constituted one underground bunker/manhole inspection sample.b. Findinqs No findings were identified.

1R07 Heat Sink Performance

(71111.Q7 - 1 sample)a. Inspection Scope The inspectors reviewed the ESW system annual thermal performance test that was performed on April 27,2011 in accordance with ST-8Q, "Testing of the Emergency Service Water System (lST)," Revision 41. This test determines the maximum lake temperature at which individual unit coolers in the east and west electric bays, and east and west crescents, can be considered operable.

Results that are less than the TS maximum allowable service water inlet temperature of 85 degrees Fahrenheit

('F) limit the plant's ability to operate under conditions of elevated lake temperature until the unit cooler degradation is corrected.

The inspectors noted that the operability of one unit cooler, 67UC-168, was limited to 84'F service water inlet temperature.

The inspectors verified that actual lake temperature had not exceeded this value during the summer season.These activities constituted one heat sink performance inspection sample.b. Findinqs No findings were identified.

7 1R1 1 Licensed Operator Requalification Proqram (71111.11Q - 1 sample)a. Inspection Scope On September 12, 2011, the inspectors observed licensed operator simulator training to assess operator performance during a scenario to verify that crew performance was adequate and evaluators were identifying and documenting crew performance problems.The inspectors evaluated the performance of risk significant operator actions, including the use of emergency operating procedures.

The inspectors assessed the clarity and effectiveness of communications, the implementation of appropriate actions in response to alarms, the performance of timely control board operation and manipulation, and the oversight and direction provided by the shift manager. Licensed operator training was evaluated for conformance with the requirements of 10 CFR Part 55, "Operators' Licenses." These activities constituted one quarterly operator simulator training inspection sample.b. Findinqs No findings were identified.

1R12 Maintenance

Effectiveness (71111J2Q - 3 samples)lnspection Scope The inspectors reviewed performance-based problems involving selected in-scope structures, systems, or components (SSCs) to assess the effectiveness of the maintenance program. The reviews focused on the following aspects when applicable:

r Proper maintenance rule scoping in accordance with 10 CFR Part 50.65;. Characterization of reliability issues;. Changing system and component unavailability;. 10 CFR 50.65 (aX1) and (a)(2) classifications;. ldentifying and addressing common cause failures;. Appropriateness of performance criteria for SSCs classified (aX2); and. Adequacy of goals and corrective actions for SSCs classified (aX1).The inspectors reviewed system health reports, maintenance backlogs, and Maintenance Rule basis documents.

The documents reviewed are listed in the Attachment.

The following systems were selected for review.o Control rod drive hydraulic system;. ESW system; and. Standby liquid control (SLC) system.These activities constituted three quarterly maintenance effectiveness inspection samples.Enclosure b. Findinqs No findings were identified.

1R13 Maintenance

Risk Assessments and Emeroent Work Control (71111

.13 - 5 samples)a. Inspection

Scope The inspectors reviewed maintenance activities to verify that the appropriate risk assessments were performed prior to removing equipment for work. The inspectors reviewed whether risk assessments were performed as required by 10 CFR 50.65(a)(4), and were accurate and complete.

When emergent work was performed, the inspectors reviewed whether plant risk was promptly reassessed and managed. The documents reviewed are listed in the Attachment.

The reviews focused on the following activities:

The week of August 15, that included 'A' and 'C' EDG monthly surveillance test, division 1 anticipated transient without scram (ATWS) pressure instrument quarterly surveillance test, 'A' SLC system quarterly function test, 'A' core spray quarterly surveillance test, and emergent maintenance to identify and repair a leak in the west dieselfire pump cooling system.The week of August 29, that included 'B' and 'D' EDG monthly surveillance test, division 2 ATWS pressure instrument quarterly surveillance test, 'B' SLC system quarterly function test, 'B' core spray quarterly surveillance test, and emergent maintenance to replace the 'B' core spray hold pump discharge check valve.The week of September 5, that included a one day maintenance outage for outgoing 345 kV line 1, planned maintenance on the 'B' reactor protection system (RPS)motor-generator, testing of the 'B' RPS electrical protection assemblies, 'B' average power range monitor system flow bias channelfunctional test, torus-to-drywell vacuum breaker operability test, main steam isolation valve limit switch instrument quarterly surveillance test, and emergent maintenance to replace the 'B' core spray hold pump seal.The week of September 19, that included reactor core isolation cooling (RCIC)system instrumentation and pump quarterly surveillance tests, replacement of the 'A'electro-hydraulic control pump, a one day maintenance period for the 'A' RHR service water system, and emergent maintenance to troubleshoot a speed indication problem with the 'A' reactor water recirculation pump, troubleshoot a startup transient speed/pressure issue with the RCIC pump, and replace the local frequency meter for the'A'EDG.

The week of September 26, that included high pressure coolant injection system quarterly surveillance test, 'B'and 'D' EDG monthly surveillance test, a planned power reduction to 65 percent for a control rod sequence exchange, single control rod scram time testing and blade interference monitoring, backwashing main condenser water boxes, and main turbine valve testing, 'B' RHR quarterly surveillance test to perform increased frequency vibration monitoring.

I These activities constituted five maintenance risk assessments and emergent work control inspection samples.b. Findinqs No findings were identified.

1R15 Operabilitv

Evaluations (71111.15 - 5 samples)a. Inspection Scope The inspectors reviewed operability determinations to assess the acceptability of the evaluations; the use and control of applicable compensatory measures; and compliance with technical specifications (TSs). The inspectors' reviews included verification that the operability determinations were conducted as specified by EN-OP-104, "Operability Determination Process." The technical adequacy of the determinations was reviewed and compared to the TSs, UFSAR, and associated design basis documents (DBDs).The inspection focused on the following operability reviews: CR-JAF-201 1-03517 concerning the effect of inaccurate period meter indication on'A' source range monitor operability; CR-JAF-2011-04281concerning RPS relay time response testing and the criteria for testing RPS relay 05A-K101C, reactor pressure instrument; CR-JAF-2011-04411 concerning continued operability of the 'B' core spray system while its hold (keep full) pump was isolated due to reverse leakage through the discharge check valve and the keep full function was being performed by the condensate transfer system ;. CR-JAF-2011-04457 concerning continued operability of four control rods after receiving notification that the vendor's revised channelfriction metric indicated that these control rods may experience degraded performance during insertion; and. CR-JAF-2011-04774 concerning continued operability of the RCIC system with a degraded check valve in the test return line to the CST.These activities constituted five operability evaluation inspection samples.b. Findinqs No findings were identified.

1R18 Plant Modifications

(71111.18 - 2 samples)a. lnspection Scope The inspectors assessed the adequacy of the 10 CFR 50.59 evaluations for the following permanent and temporary modifications respectively.

The inspectors' reviews considered whether the installations were consistent with the modification documentation, that the drawings and procedures were updated as applicable, and that the post-installation testing was adequate.

The following reviews represented one permanent modification inspection sample and one temporary modification inspection sample: Enclosure 10 Permanent modification of the RPS to support RPS test box usage during surveillance testing, thereby preventing initiation of actual half scrams due to testing, performed in accordance with Engineering Change (EC) 15347, "lnstall Pomana Type Test Jacks in Panels 09-15, 09-17 for RPS Test Box Use;" and Temporary modification of the 'A' and 'B' reactor water recirculation motor-generators that recalibrated the tachometer generator voltage regulator circuits to produce a lower voltageto-speed response, performed in accordance with EC 25477 and EC 25480, "Recirc Tach Generator 02-184P-1A/B(TACH)115V Output Acceptance." b.Findinqs No findings were identified.

1 R19 Post-Maintenance Testinq (PMT) (71 1 1 1

.19 - 6 samples)a.Inspection

Scope The inspectors reviewed post-maintenance test procedures and associated testing activities for selected risk-significant mitigating systems to assess whether the effect of maintenance on plant systems was adequately addressed by control room and engineering personnel.

The inspectors verified whether test acceptance criteria were clear, demonstrated operational readiness, and were consistent with DBDs; test instrumentation had current calibrations, adequate range, and accuracy for the application; and tests were performed, as written, with applicable prerequisites satisfied.

Upon completion, the inspectors verified whether equipment was returned to the proper alignment necessary to perform its safety function.

PMT was evaluated for conformance with the requirements of 10 CFR Part 50, Appendix B, Criterion Xl, "Test Control." The documents reviewed are listed in the Attachment.

PMT activities associated with the following WOs were reviewed:. WO 00228000, preventive maintenance on the'A' standby gas treatment (SGT)system;. WO 5203502A, preventive maintenance replacement of 05A-K128D, an RPS relay for annunciator 09-5-2-60; o WO 29026203, replacement of 'A' EDG local frequency meter;. WO 52222339, RPS reactor pressure instrument response time testing of 05A-K101C;. WO 23477801, rebuild core spray'B'hold pump; and. WO 52038354, replacement of RCIC low steam pressure master trip unit, 13MTU-287C.These activities constituted six PMT inspection samples.Findinqs No findings were identified.

b.Enclosure 11 1R22 Surveillance Testinq (71111.22 - 7 samples)a. Insoection Scope The inspectors witnessed performance of surveillance tests (STs) and/or reviewed test data of selected risk-significant SSCs to assess whether the SSCs satisfied TSs, UFSAR, technical requirements manual, and station procedure requirements.

The inspectors reviewed whether test acceptance criteria were clear, demonstrated operational readiness, and were consistent with DBDs; test instrumentation had current calibrations, adequate range, and accuracy for the application; and tests were performed, as written, with applicable prerequisites satisfied.

Upon ST completion, the inspectors verified that equipment was returned to the status specified to perform its safety function.

The following STs were reviewed:. ST-2AL, "RHR Loop A Quarterly Operability Test (lST)," Revision 31;. ST-2XA, "RHR service Water Loop A Quarterly Operability Test (lST)," Revision 13;. ST-2AM, "RHR Loop B Quarterly Operability Test (lST)," Revision 31;. ST-24J, "RCIC Flow Rate and Inservice Test (lST),' Revision 41;. ISP-10OD-RPS, "RPS Instrument Functional TesUCalibration (ATTS)," Revision 37;. ST-3PB, "Core Spray Loop B Quarterly Operability," Revision 21; and o ISP-16, "Drywell Floor Drain Sump Flow Loop FunctionalTesUCalibration*," Revision 36.These activities represented seven surveillance testing inspection samples.b. Findinos No findings were identified.

2. RADIATION

SAFETY Cornerstone:

Occupational Radiation Safety and Public Radiation Safety

2RS1 Radioloqical

Hazard Assessment and Exposure Controls (71124.01-1 sample)a. Inspection Scope The inspectors reviewed the performance indicators for the Radiation Cornerstone, recent operational occurrences and the latest quality assurance audit of the Radiation Protection program.Radioloqical Hazard Assessment The inspectors reviewed changes to plant operations that may result in a significant new radiological hazard for onsite workers or members of the public since the last inspection.

The inspectors verified that FitzPatrick staff have assessed the potential impact of these changes and has implemented periodic monitoring, as appropriate, to detect and q uantify the rad iolo gical hazard.Recent radiological surveys from more than six plant areas were reviewed by the Enclosure 12 inspectors to evaluate the thoroughness and frequency of the surveys and that they were appropriate based on the radiological hazards.The inspectors conducted walkdowns and performed independent radiation surveys of the facility, including radioactive waste processing, storage, and handling areas, to evaluate the existing radiological conditions and the efficacy of the associated radiological postings and controls.The inspectors observed and evaluated the following radiological risk-significant work activity:

Placement of a shield lid on top of a loaded on-site storage container in the radwaste truck bay (a transient locked high radiation area (HRA)).With respect to the above work activity, the inspectors verified that appropriate prework surveys were performed and were sufficient to identify and quantify the radiological hazards and to establish adequate protective measures.

In addition, the inspectors reviewed applicable radiological surveys associated with this work activity to determine if hazards were properly identified, including the following:

identification of hot particles, the presence of alpha emitters, the potentialfor airborne radioactive materials, the hazards associated with work activities that could negatively affect the radiological conditions, and any significant radiation field dose gradients that could result in nonuniform exposures of the body. The inspectors selected at least five air sample survey records during 2011 and verified that the samples were collected and counted in accordance with FitzPatrick procedures.

The inspectors observed work in potential airborne areas to evaluate if applicable air monitoring was representative of the breathing air zone of the workers. The inspectors also reviewed the use of continuous air monitors to monitor real-time airborne conditions in accordance with FitzPatrick procedures.

The inspectors verified that FitzPatrick's program for monitoring loose surface contamination in areas of the plant was adequate to assess the potential for airborne contamination conditions.

Instructions to Workers The inspectors observed various radioactive material containers and verified that they were labeled and controlled in accordance with 10 CFR Parl2Q requirements.

Radiation work permits (RWPs) associated with the radiological risk-significant work activities listed above were evaluated by the inspectors to identify what work control instructions or control barriers were specified and that plant-specific technical specification HRA requirements were met, including the use of applicable electronic personal dosimeter alarm setpoints that were specified in conformance with survey indications and plant policy.The inspectors reviewed one electronic personal dosimeter dose rate alarm occurrence that was documented in a CR. The inspectors verified that FitzPatrick staff responded appropriately to the occurrence and that corrective actions and dose evaluations were adequate.Enclosure 13 Contamination and Radioactive Material Control The inspectors conducted observations at the main radiological controlled area egress location to observe the performance of personnel surveying and releasing material for unrestricted use to verify that those activities were performed in accordance with plant procedures and the procedures were sufficient to control the spread of contamination and prevent unintended release of radioactive materials from the site.The inspectors reviewed FitzPatrick's criteria for the survey and release of potentially contaminated material and verified that the radiation detection instrumentation was being used at its most effective sensitivity capability.

The inspectors selected three sealed sources from FitzPatrick's inventory records and verified that the required semi-annual leak tests were performed.

The inspectors verified that there have been no changes in the inventory of sources currently listed in the National Source Tracking System.Radioloqical Hazards Control and Work Coveraqe During tours of the facility and review of the work activity listed above, the inspectors evaluated the ambient radiological conditions and verified that existing conditions were consistent with posted surveys, RWPs, and worker briefings, as applicable.

During these work activity performance observations, the inspectors verified the adequacy of radiological controls, such as required surveys (including system breach radiation, contamination, and airborne surveys), radiation protection job coverage (including audio and visual surveillance for remote job coverage), contamination controls, and means of using electronic personal dosimeters in high noise areas as HRA monitoring devices.The inspectors verified that radiation monitoring devices were placed on the individual's body appropriately to monitor dose from external radiation sources. This review included high-radiation work areas with significant dose rate gradients.

The inspectors reviewed two RWPs for work within potential airborne radioactivity areas with the potential for individual worker internal exposures.

The inspectors evaluated the airborne radioactivity controls and monitoring, including potentials for significant airborne radioactivity levels (e.g., grinding, grit blasting, system breaches, entry into tanks, cubicles, reactor cavities).

For these selected potential airborne radioactive areas, the inspectors verified the appropriate use of high-efficiency particulate air ventilation system operation.

The inspectors examined the station's physical and programmatic controls for highly activated or contaminated materials (nonfuel)stored within the spent fuel pool and verified that appropriate controls were in place to preclude inadvertent removal of these materials from the pool.Tours within the radiological controlled area were conducted by the inspectors to evaluate radiological postings and physical controls for HRAs and very high radiation areas (VHRAs) with respect to regulatory requirements.

14 Risk-Siqnificant Hiqh Radiation Area and Verv Hiqh Radiation Area Controls The inspectors discussed with the radiation protection manager and one first-line health physics supervisor, the controls and procedures for high-risk HRAs and VHRAs and actions to be taken during changing plant conditions.

b.Radiation Worker Performance During observation of the work activity listed above, the inspectors observed radiation worker performance with respect to applicable radiation protection work requirements to determine if workers were aware of the significant radiological conditions in their workplace and their work performance was within the RWP control/limit requirements specified for the work performed.

The inspectors reviewed several radiological problem reports since the last inspection that identified the cause of the event to be human performance errors to determine if there was an observable pattern traceable to a similar cause and if this perspective matched the corrective action approach taken by station personnelto resolve the reported problems.Radiation Protection Technician Proficiencv During observation of the work activity listed above, the inspectors evaluated the performance of radiation protection technicians with respect to radiation protection work requirements and determined that technicians were aware of the radiological conditions in their workplace and that the RWP controls/limits and their performance was consistent with their training and qualifications with respect to the radiological hazards and work activities.

The inspectors reviewed several radiological problem reports since the last inspection that identified the cause of the event to be radiation protection technician error to determine if there was an observable pattern traceable to a similar cause and if this perspective matched the corrective action approach taken by FitzPatrick staff to resolve the reported problems.Problem ldentification and Resolution The inspectors verified that problems associated with radiation monitoring and exposure control were being identified by FitzPatrick personnel at an appropriate threshold and were properly addressed for resolution in the corrective action program (CAP).Findinqs No findings were identified.

Occupational Dose Assessment (7 1 124.04)2RS4

a. Inspection Scope

The inspectors reviewed the most recent National Voluntary Laboratory Accreditation Program (NVLAP) accreditation report on FitzPatrick.

15 The inspectors verified that FitzPatdck's personnel dosimeters that require processing were NVLAP accredited.

The inspectors verified the vendor's NVLAP accreditation.

The inspector ensured that the approved irradiation test categories for each type of personnel dosimeter used were consistent with the types and energies of the radiation present, and how the dosimeter was being used.The inspectors verified that FitzPatrick informed workers, as appropriate, of the risks of radiation exposure to the embryo/fetus, the regulatory aspects of declaring a pregnancy, and the specific process to be used for (voluntarily)declaring a pregnancy.

The inspectors selected individuals who had declared their pregnancy during the current assessment period, and verified that FitzPatrick's radiological monitoring program for declared pregnant workers was technically adequate to assess the dose to the embryo/fetus.

The inspectors reviewed the exposure results and monitoring controls employed by FitzPatrick and with respect to the requirements of 10 CFR Part 20. Two workers had declared pregnancies in the past 12 months.b. Findinos No findings were identified.

2RS5 Radiation

Monitorinq lnstrumentation (71124.05)

Inspection Scope During the period July 18 through 22,2011, the inspectors conducted the following activities to verify that FitzPatrick personnel were providing accurate and operable radiation monitoring instruments used to 1) monitor areas, materials, and workers to ensure a radiologically safe work environment, and 2) detect and quantify radioactive process streams and effluent releases.

lmplementation of these controls was reviewed against the criteria contained in 10 CFR Part 20, relevant TSs, and FitzPatrick's procedures.

r The inspectors reviewed the UFSAR to identify applicable radiation monitors associated with transient high and VHRAs including those used in remote emergency assessment.

r The inspectors obtained a list of in-service survey instrumentation including air samplers, neutron survey instruments, personnel and small article monitors.

The inspectors reviewed the list to determine if an adequate number of instruments were available to support operations.

o The inspectors reviewed two FitzPatrick self-assessments for contamination and radioactive material control and radiation protection instrumentation and protective equipment.

r The inspectors reviewed source check and calibration procedures for the radiation monitoring instruments.. The inspectors reviewed alarm set-points for area radiation monitors and the basis for the set-points.

o The inspectors reviewed the alarm sefpoints and basis for effluent monitors and the methods used to calculate the set-points.

16 Walkdowns and Observations o The inspectors walked down the following radiation monitors: a) 17-04-1 drywell monitor'A';

b) 17-04-2 drywell monitor'B';

c) 17-RM-150'A'/'B' steam jet air ejector(SJAE)off-gas;d) 17RM-461 TB exhaust;e) 17RM-351 service water;f) 17RM-350 liquid radwaste effluent monitor; and g) 17RM-456 refuelfloor exhaust;. The inspectors verified that configuration of the monitors aligned with the Offsite Dose Calculation Manual (ODCM) descriptions.

The inspectors looked for monitor degradation and out of service tags.o The inspectors verified the calibration and source checkof 10 portable survey instruments and observed their material condition.

o The inspectors observed source checks of portable survey instruments.. The inspectors walked down eight area radiation monitors and verified the readout with a portable survey instrument.

r The inspectors verified periodic source checks were performed for two personnel monitors and two small article monitors.Calibration and Testinq Prooram. The inspectors verified for three effluent monitor instruments that channel calibration and functional tests were performed consistent with TSs and the ODCM. The inspectors also verified that the monitors were calibrated with National Institute of Standards and Technology (NIST) traceable sources that represent the plant nuclide mix.o The inspectors verified that the effluent monitor alarm set-points were established at or below the ODCM limits.Laboratorv I nstrumentation. The inspectors verified laboratory analytical instruments daily performance checks and calibration data indicated the frequency of calibrations was adequate and there was no indication of degraded instrument performance.

The inspectors reviewed performance for the planchet counter-S's and the high purity germanium and germanium lithium detector Nos. 1 ,2,3, and 4 systems.Whole Bodv Counter. The inspectors reviewed the methods and sources used to perform whole body counter functional checks before daily use and verified the check sources are appropriate and align with the plant isotopic mix.. The inspectors reviewed the most recent calibration report for the whole body counter and verified the sources used were representative of the plant source term and that appropriate calibration reference devices were used.Enclosure 17 Post Accident Monitorinq lnstrumentation. The inspectors reviewed a post accident high-range monitor calibration.

e The inspectors verified that an electronic calibration was performed for all range decades above 10 rem/hour and that at least one decade at or below 10 rem/hour were calibrated using an appropriate radiation source.o The inspectors verified that the acceptance criteria were reasonable.. The inspectors reviewed the calibration of two high-range effluent monitors and reviewed their availability.

o The inspectors reviewed FitzPatrick's capability to collect high-range, post accident iodine effluent samples.. There was no opportunity to observe electronic or radiation calibration of these instruments during this inspection:

portal monitors, personnel contamination monitors.

and small article monitors.. The inspectors verified that the alarm set-point values for one of each type of these instruments were reasonable to ensure that licensed material was not released from the site.o The inspectors reviewed the calibration documentation for each instrument selected.Portable Survev lnstruments.

Area Radiation Monitorinq Svstem. Electronic Dosimetrv, and Air Samplers/

Continuous Atmospheric Monitorinq (CAMs). The inspectors reviewed calibration documentation for at least one of each type of instrument.

The inspectors reviewed detector measurement geometry and calibration methods and had the technician demonstrate the use of its instrument calibrator.. The inspectors verified that FitzPatrick staff took appropriate corrective action for instruments found significantly out of calibration and evaluated the possible consequences of instrument use since the last successful calibration or source check.lnstrument Calibrator. The inspectors reviewed the current output values and verified FitzPatrick periodically measured calibrator output over the range of instruments used.o The inspectors verified the measurement device was calibrated by a facility using N IST traceable sources.Calibration and Check Sources. The inspectors verified the check sources used were representative of the types and energies of the radiation encountered in the plant.Problem ldentification and Resolution. The inspectors verified that problems associated with radiation monitoring instrumentation were being identified at the appropriate threshold and entered into the CAP.Enclosure 18 b. Findinos No findings were identified.

2RS7 Radiolooical

Environmental Monitorinq Proqram (71124.07 - 1 sample)a. Inspection Scope The inspectors reviewed the annual radiological environmental operating reports and the results of any FitzPatrick assessments since the last inspection, to verify that the radiological environmental monitoring program (REMP) was implemented in accordance with the plant TSs and the ODCM. The inspectors reviewed the report for changes to the ODCM with respect to environmental monitoring, commitments in terms of sampling locations, monitoring and measurement frequencies, land use census, interlaboratory comparison program, and analysis of data.The inspectors reviewed the ODCM to identify locations of environmental monitoring stations.The inspectors reviewed the UFSAR for information regarding the environmental monitoring program and meteorological monitoring instrumentation.

The inspectors reviewed the annual effluent release report and the 10 CFR Part 61 ,"Licensing Requirements for Land Disposal of Radioactive Waste," report, to determine if FitzPatrick was sampling, as appropriate, for the predominant and dose-causing radionuclides likely to be released in effluents.

The inspectors walked down air sampling stations and thermoluminescent dosimeter (TLD) monitoring stations to determine whether they were located as described in the ODCM and to determine the equipment material condition' For the air samplers and TLDs selected above, the inspectors reviewed the calibration and maintenance records to verify that they demonstrate adequate operability of these components.

Additionally, the inspectors reviewed the calibration and maintenance records of composite water samplers as available.

The inspectors verified that FitzPatrick staff had initiated sampling of other appropriate media upon loss of a required sampling station.The inspectors observed the collection and preparation of environmental samples from different environmental media (e.9., ground and surface water, milk, vegetation, sediment, and soil) as available.

The inspectors verified that environmental sampling was representative of the release pathways as specified in the ODCM and that sampling techniques were in accordance with procedures.

Based on direct observation and review of records, the inspectors verified that the meteorological instruments were operable, calibrated, and maintained in accordance with guidance contained in the UFSAR, NRC Regulatory Guide 1.23, "Meteorological Monitoring Programs for Nuclear Power Plants," and FitzPatrick procedures.

The inspectors verified that the meteorological data readout and recording instruments in the control room and at the tower were operable.Enclosure 19 The inspectors verified that missed and or anomalous environmental samples were identified and reported in the annual environmental monitoring report. The inspectors reviewed FitzPatrick's assessment of any positive sample results. The inspectors reviewed the associated radioactive effluent release data that was the source of the released material.The inspectors selected SSCs that involved or could reasonably involve licensed material for which there is a credible mechanism for licensed material to reach ground water, and verified that FitzPatrick had implemented a sampling and monitoring program sufficient to detect leakage of these SSCs to ground water. There have been no significant changes in this program area since the last inspection.

The inspectors verified that records, as required by 10 CFR Part 50.75(9), of leaks, spills, and remediation since the previous inspection were retained in a retrievable manner.The inspectors reviewed any significant changes made by FitzPatrick to the ODCM as the result of changes to the land census, long-term meteorological conditions (three year average), or modifications to the sampler stations since the last inspection.

The inspectors reviewed technicaljustifications for any changed sampling locations.

The inspectors verified that FitzPatrick performed the reviews required to ensure that the changes did not affect its ability to monitor the impacts of radioactive effluent releases on the environment.

The inspectors verified that the appropriate detection sensitivities with respect to TS/ODCM were used for counting samples. The inspectors reviewed quality control charts for maintaining radiation measurement instrument status and actions taken for degrading detector performance.

The inspectors reviewed the results of FitzPatrick's interlaboratory comparison program to verify the adequacy of environmental sample analyses performed by FitzPatrick.

The inspectors verified that the interlaboratory comparison test included the media/nuclide mix appropriate for the facility.The inspectors verified that problems associated with the REMP were being identified by FitzPatrick at an appropriate threshold and were properly addressed for resolution in FitzPatrick's CAP. The inspectors verified the appropriateness of the corrective actions for a selected sample of problems documented by FitzPatrick that involved the REMP.b. Findinqs No findings were identified.

OTHER ACTIVITIES

4QA1 Performance Indicator Verification (71151 - 6 samples).1 Mitiqatinq Svstems Cornerstone - Safetv Svstem Functional Failures (1 sample)Enclosure a.20 lnspection Scope The inspectors sampled FitzPatrick's submittals for the safety system functional failures performance indicator for the period of October 1,2Q1Q, through June 30, 201 1. To determine the accuracy of the performance indicator data reported during that period, the inspectors used definitions and guidance contained in Nuclear Energy lnstitute (NEl)99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6. The inspectors reviewed licensee event reports (LERs) and NRC integrated inspection reports to validate the accuracy of the submittals.

Findinqs No findings were identified.

Barrier Inteoritv Cornerstone - Reactor Coolant Svstem (RCS) Specific Activitv and RCS Leakaqe (2 samples)Inspection Scope The inspectors reviewed FitzPatrick staff's submittals for the RCS specific activity and RCS leakage performance indicators for the period of October 1, 2010, through June 30, 2Q11. To determine the accuracy of the performance indicator data reported during that period, the inspectors used definitions and guidance contained in NEI 99-02. The inspectors reviewed RCS sample analysis and control room log summaries and to validate the accuracy of the submittals.

Findinos No findings were identified.

lnitiatinq Events Cornerstone - Unolanned Scrams, Unplanned Power Chanoes. and Unplanned Scrams with Complications (3 samples)lnspection Scope The inspectors reviewed FitzPatrick staff's submittals for the unplanned scrams per 7,000 critical hours, unplanned power changes per 7,000 critical hours, and unplanned scrams with complications performance indicators for the period of October 1,2010, through June 30, 2011. To determine the accuracy of the performance indicator data repo(ed during that period, the inspectors used definitions and guidance contained in NEI 99-02. The inspectors reviewed control room logs and NRC integrated inspection reports to validate the accuracy of the submittals.

b..2 a.b..3 Enclosure b.21 Findinos lntroduction:

The inspectors identified an unresolved item (URl) associated with FitzPatrick staff's interpretation of guidance for reporting unplanned power changes per 7,000 critical hours. Specifically, Entergy personnel did not report three power reductions during the second quarter of 2011 that the inspectors considered to have been reportable.

The unplanned power changes per 7,000 critical hours performance indicator is defined as the number of unplanned changes in reactor power of greater than 20 percent of full-power, per 7,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> of critical operation excluding manual and automatic scrams.Description:

On January 11,2011, FitzPatrick operators performed a power reduction to 55 percent to plug a leaking condenser tube. This power reduction was reported in the first quarter performance indicators as an unplanned power change. The root cause evaluation of this event determined that additional condenser tube leaks could occur. As a result, an operational decision-making issue (ODMI) action plan was developed by Entergy staff, which established four action levels for chemistry parameters (condensate demineralizer influent (CDl) conductivity, reactor water conductivity, and reactor water chloride concentration).

These action levels provide guidance for operators to perform a range of actions, such as a power reduction to support condenser tube plugging.

The action plan was established on April 4, 2011.On May 6,2011, operators observed indications of a rapid increase in hotwell conductivity and determined that CDI conductivity increased to above action level 3. In accordance with the ODMI action plan operators reduced power to 55 percent later that day to identify and plug the leaking main condenser tube.The inspectors reviewed the guidance for reporting performance indicators in NEI 99-02,"Regulatory Assessment Performance lndicator Guideline," Revision 6. Concerning unplanned power reductions per 7,000 critical hours, the guidance states, "This indicator captures changes in reactor power that are initiated following the discovery of an off-normal condition.

lf a condition is identified that is slowly degrading and the licensee prepares plans to reduce power when the condition reaches a predefined limit, and 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> have elapsed since the condition was first identified, the power change does not count. lf, however, the condition suddenly degrades beyond the predefined limits and requires rapid response, this situation would count." In follow-up questions regarding the May 6 down power Entergy staff indicated that the down power was planned as a contingency action in the ODMI action plan and that, because the initial condition for which the action plan was written occurred greater than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to the down power, the down power should not be counted. The inspectors considered that notwithstanding an action plan, the condition was best described as a suddenly degrading condition that resulted in operators decreasing power the same day to address the condition.

Therefore, it appeared to be appropriate to report the May 6 down power as unplanned.

In addition, the inspectors determined that FitzPatrick operators performed two power reductions to 75 percent on June 7, and June 9, 2011, to support cleaning main condenser water boxes. This cleaning was necessary to address fouling that occurred during planned maintenance on the lake intake travelling screens. The fouling was the result of operation of circulating water system gates which caused sediment to be Enclosure 4cA2 22 ingested by the circulating water system. The inspectors determined that FitzPatrick staff did not report these two down powers as unplanned in the second quarter Pl.The inspectors reviewed the applicable guidance in NEI 99-02 which indicated that"Anticipated power changes greater than 20 percent in response to expected environmental problems (such as accumulation of marine debris, biological contaminants, animal intrusion, environmental regulations, or frazil icing) may qualify for an exclusion from the indicator.

The licensee is expected to take reasonable steps to prevent intrusion of animals, marine debris, or other biological groMh from causing power reductions.

Intrusion events that can be anticipated as a part of a maintenance activity or as part of a predictable cyclic behavior would normally be counted, unless the down power was planned 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in advance . . ." FitzPatrick's staff indicated they considered this allowance to be applicable, in that they had taken reasonable steps to prevent intrusion by cleaning the lake water forebays prior to the maintenance.

Because this activity had not been performed on line since the traveling screens had been replaced, station personnel also considered that they could not reasonably have anticipated the severity of the fouling that occurred.

Finatty, FitzPatrick staff included a contingency down power in the work week schedule, and noted in the applicable operating procedure that operation of the gates may require a power reduction to perform condenser cleaning.Notwithstanding an acknowledgement by FitzPatrick staff in their procedures and work week schedule as to the possibility of a need for a plant down power, the inspectors considered that these two down power conditions were anticipated as part of a maintenance activity and appeared to have not been plannedT2 hours in advance.Therefore the inspectors had questions as to the appropriateness of not reporting the plant down powers on June 7 , and June 9, 2011.FitzPatrick staff initiated a review of these issues as part of the NRC and industry performance indicator "frequently asked questions" (FAO) process. This item remains unresolved pending further information from the FAQ process. (URl 05000333/201 1004-01, Unplanned Power Reduction Pl Reporting)ldentification and Resolution of Problems (71152 - 2 samples)Review of ltems Entered into the Corrective Action Proqram Inspection Scope As required by lnspection Procedure71152, "ldentification and Resolution of Problems," to identify repetitive equipment failures or specific human performance issues for follow-up, the inspectors performed a daily screening of all items entered into FitzPatrick's CAP. The review was accomplished by accessing FitzPatrick's computerized database for CRs and attending CR screening meetings.

In accordance with the baseline inspection procedures, the inspectors selected items across the Initiating Events, Mitigating Systems, Barrier Integrity, and Public Radiation Safety cornerstones for additionalfollow-up and review. The inspectors assessed FitzPatrick personnel's threshold for problem identification, the adequacy of the Gause analyses, and extent of condition review, operability determinations, and the timeliness of the specified corrective actions..1 a.Enclosure 23 b..2 a.The inspector reviewed 12 corrective action CRs that were initiated since the last radioactive effluent inspection that were associated with this program area. The inspector verified that problems identified by these CRs were properly characterized in FitzPatrick's event reporting system and that applicable causes and corrective actions were identified commensurate with the safety significance of the radiological occurrences.

Findinqs and Observations No findings were identified.

Annual Sample: Review of a Low Pressure Coolant Iniection Valve Demand Failure (1 sample)Inspection Scope The inspectors selected CR-JAF-2010-04912 as a problem identification and resolution sample for a detailed follow-up review. This CR documented that on August 30, 2010, the 'B' RHR system low pressure safety injection (LPSI) outboard motor operated valve (MOV), 10MOV-278, failed to open during a routine surveillance test. 10MOV-27B is a normally open valve that was closed to maintain reactor coolant pressure boundary while stroke testing the LPSI inboard isolation valve, 10MOV-258.

Entergy staff initiated corrective actions to replace the lower motor operator contact assembly (fingerbase), send the fingerbase for chemical analysis of residue on the contacts, and inspect upper and lower fingerbases for all risk significant MOVs in close proximity to 10MOV-278.

The inspectors assessed FitzPatrick's problem identification threshold, apparent cause evaluation (ACE), extent of condition reviews, operability evaluations, and the prioritization and timeliness of corrective actions to determine whether FitzPatrick was appropriately identifying, characterizing, and correcting problems associated with the identified issues and whether the planned or completed corrective actions were appropriate to prevent recurrence.

Findinqs and Observations No findings were identified.

The inspectors determined that FitzPatrick staff properly implemented their CAP regarding the initial discovery of the reviewed issue. The CR packages were complete and included an ACE, operability evaluations, extent of condition reviews, use of operating experience, and contained implemented and planned corrective actions. Additionally, the elements of the CRs, ACE, and operability evaluations were detailed and thorough.

lmplemented and planned corrective actions were appropriate to minimize the potential of recurrence.

Additionally, the inspectors reviewed chemical analysis performed by an independent contracted laboratory on the surface contamination of the contact assembly fingers.Analysis showed that the contact fingers had an even black tarnish consisting of sulfur.The analysis determined that sulfur can be damaging to electrical contacts due to causing increased contact resistance.

However, the analysis also showed that if voltage and current across the contacts was sufficient the damaging effects of the sulfide would be negligible.

FitzPatrick staff concluded that source of the tarnish layer was unknown.b.Enclosure 24 Per the recommendation in the independent analysis, FitzPatrick staff reviewed the material condition of the upper and lower fingerbases for risk significant MOVs in close proximity to 10MOV-278.

The inspectors concluded that a more thorough extent of condition may have included a review of 10MOV-278 mainlenance records to determine if other risk significant MOVs had been subjected to similar conditions and maintenance which may have led to contact tarnishing.

Further, any MOVs identified as being susceptible to contact tarnishing could then have been included in the review of upper and lower fingerbases.

However, the inspectors concluded that FitzPatrick's extent of condition was adequate because the tarnish layer on the contacts was not considered to be the cause of the MOV failure and there have been no similar MOV failures..3 Annual Sample: Review of the Operator Workaround Proqram (1 sample)a. Inspection Scope FitzPatrick operations department personnel monitor the impact of plant deficiencies on operational response capabilities in accordance with EN-FAP-OP-006, "Operator Aggregate lmpact Index Performance Indicator," Revision 0. As inputs, this procedure utilizes the plant effect code that was assigned to the equipment deficiency in the associated work order, and the age of active equipment tagouts. From this, plant deficiencies such as operator workarounds, operator burdens, control room deficiencies and alarms, and longstanding tagouts, are tallied and converted to a performance indicator on a monthly basis. lf the performance indicator is above a threshold value, then a more in-depth assessment of the aggregate impact of plant deficiencies is performed in accordance with surveillance test procedure ST-99H, "Operations Cumulative lmpact Assessment," Revision 10. FitzPatrick personnel also perform this assessment on a periodic basis.The inspectors reviewed the results of ST-99H, completed on April 5,2011, including the resolution of items identified in the assessment.

The inspectors reviewed operator workarounds (deficient conditions that require compensatory operator actions for operation during off-normal plant conditions), operator burdens (deficient conditions that require compensatory operator actions for operation during normal plant conditions), control room deficiencies such as non-functional or incorrect display information and equipment controls requiring some off-normal mode of operation, and longstanding tagouts, to assess their effect on the operator's ability to implement operating procedures under normal, off-normal, and emergency conditions.

b. Findinqs and Observations No findings were identified.

The inspectors determined that the station's CAP was effectively used to identify and resolve operator workaround conditions.

4OA3 Follow-up

of Events and Notices of Enforcement Discretion (71153 - 1 sample).1 (Closed) LER 05000333/2011002-00, Failure to lsolate the Reactor Building Results in a Condition Prohibited by Technical Specifications On January 10,2011, the 'A' refueling floor exhaust radiation monitor was declared inoperable for maintenance.

For this condition, TS 3.3.6.2 requires that the reactor building ventilation system be isolated and that the standby gas treatment (SGT) system Enclosure 25 be placed in operation within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. At the start of this maintenance activity this configuration had already been established to support another unrelated maintenance activity.

Operators did not adequately track the TS requirements for the 'A' refuel floor exhaust radiation monitor being inoperable, and as a result, reactor building ventilation was restored at 12:30 pm after completion of the other maintenance activity.

The following day, operators recognized the error and isolated the reactor building ventilation system at2:54 pm.The inspectors reviewed the LER and CR-JAF-2011-00189 regarding this event. The enforcement aspects of the TS violation are discussed in Section

4OA7 of this report.This LER is closed.4OA4 Supplemental

Inspections

.1 Licensee Strike Continqencv

Plans (92709)a. Inspection Scope The contract between Entergy and the FitzPatrick collective bargaining unit was due to expire during this inspection period. The inspectors evaluated the adequacy of Entergy's strike contingency plan to determine if the required minimum number of qualified personnel were available for the proper operation and safety of the facility, and to determine if the plan complied with TS and CFR requirements.

Prior to expiration, a new contract agreement was reached and subsequently ratified.b. Findinqs No findings were identified.

4OA5 Other Activities

.1 Operation

of an Independent Spent Fuel Storaqe Installation (lSFSl) at Operatinq Plants (60855.1)a. Inspection Scope The inspectors verified by direct observation and independent evaluation that FitzPatrick performed loading activities at the ISFSI in a safe manner and in compliance with applicable procedures.

b. Findinqs No findings were identified.

4OAO Meetinos.

lncludinq Exit Exit Meetinq Summarv The inspectors presented the inspection results to Mr. B. Sullivan and other members of Entergy's management at the conclusion of the inspection on October 19, 2011. The Enclosure 26 inspectors asked Entergy personnel whether any materials examined during the inspection should be considered proprietary.

No proprietary information was identified by Entergy's personnel.

4C.A7 Licensee-ldentified Violations The following violation of very low safety significance (Green) was identified by the licensee and is a violation of NRC requirements which meets the criteria of the NRC Enforcement Policy, for being dispositioned as a Non-Cited Violation.. TS limiting condition for operation (LCO) 3.3.6.2 Condition A requires that, with one channel of the refueling floor exhaust radiation monitors inoperable, the channel be placed in trip within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. lf Condition A is not met, Condition C actions C.1.1 and C.1

.2 require that the reactor building ventilation

system be isolated and the standby gas treatment system be placed in operation within one hour. FitzPatrick staff identified that, contrary to the above, on January 11,2011, the TS LCO Condition A required action was not completed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of having made the'A' refueling floor exhaust radiation monitor inoperable, and that the Condition C required actions C.1.1 and C.1.2 were not subsequently completed within one hour.The inspectors determined this TS violation was of very low safety significance (Green) because it represented only a degradation of the radiological barrier function provided for the secondary containment, as discussed in Inspection Manual Chapter 0609.04, "lnitial Screening and Characterization of Findings." This issue was entered into FitzPatrick's CAP as CR-JAF-2O11-00189.

ATTACHMENT:

=SUPPLEMENTAL

INFORMATION=

KEY POINTS OF CONTACT

Enterqv Personnel

K. Bronson, Site Vice President
B. Sullivan, General Manager, Plant Operations
C. Adner, Manager, Operations
V. Bacanskas, Manager, Design Engineering
C. Brown, Manager, Quality Assurance, Entergy
B. Finn, Director, Nuclear Safety Assurance
D. Koelbel, Sr. Engineer, Fire Protection
G. Sullivan, Acting Manager, Security
J. Pechacek, Manager, Licensing
D. Poulin, Manager, System Engineering
T. Raymond, Manager, Project Management
M. Reno, Manager, Maintenance
P. Scanlan, Manager, Programs and Components

Engineering

E. Wolf, Manager, Radiation

Protection

M. Woodby, Director, Engineering

LIST OF ITEMS

OPEN, CLOSED, AND DISCUSSED

Opened

05000333/2011004-01

Closed

05000333/201
002-00 Unplanned
Power Reduction
Pl Reporting Failure to lsolate the Reactor Building Results in a Condition
Prohibited

by Technica I Specifications

URI LER

Discussed

None Attachment

LIST OF DOCUMENTS

REVIEWED Section 1R01: Adverse Weather Protection Procedures:

AOP-13, "High Winds, Hurricanes and Tornadoes," Revision 13

Section 1R04: Equipment

Aliqnment
OP-13, "Residual Heat Removal System," Revision 95
OP-33, "Fire Protection", Revision 54;OP-14, "Core Spray System," Revision 33 Section 1R05: Fire Protection Procedures:
PFP-PWR29, "switchgear Room-EasUElev.
2' Fire ArealZone lllSW-2," Revision 2
PFP-PWR3O, "switchgear Room-WesVElev.
2' Fire ArealZone
IC/SW-1," Revision 2
PFP-PWR31, "Emergency Diesel Generator Spaces-South/Elev.
2'Fire ArealZone
V/EG-1,
EG-2. EG-s," Revision 2
OP-60, "Diesel Generator Room Ventilation," Revision 8;PFP-PWR14, "Crescent Area-easU
Elevation
27' , 242' Fire ArealZone
XVll/RB-1E," Revision 3
PFP-PWR33, "Pump Rooms (Screenwell)/Elev.
255' Fire Area/Zone Xll/SP-1, Xlll/SP-2, lB/FP-1,
FP-3,'Revision Documents:
JAF-RPT-O4-00478, "JAF Fire Hazards Analysis," Revision 2
DBD-076 TAB lX, "Design Basis Document for Fire Protection, System Safe Shutdown," Revision 5
JAF-ANAL-FPS-01139, "Fire Barrier Analysis, Various Unsealed Penetrations from Crescents and Main Steam Tunnel to Torus," Revision 2

Section 1R06: Flood Protection

Measures Procedures:
EN-DC-346, "Cable Reliability Program," Revision 2 Condition Reports: CR-JAF-2o11-04407
CR-JAF-201144892
CR-JAF-2011-04897
Work Orders: 52285065-01

Section 1R11: Licensed Operator Requalification

Proqram Procedures:
AOP-41, "Feedwater Malfunction," Revision 9
EOP-2, "RPV Control," Revision 9
EOP-3, "Failure to Scram," Revision 9
EOP-3A, "Failure to Scram - ED," Revision 2
EOP-4, "Primary Containment Control," Revision I

Section 1R12: Maintenance

Effectiveness Procedures:
EN-DC-203, "Maintenance Rule Program", Revision 1
EN-DC-204, "Maintenance Rule Scope and Basis," Revision 2
EN-DC-205, "Maintenance Rule Monitoring", Revision 3
EN-DC-206, "Maintenance Rule (aX1) Process," Revision 1
OP-25, "Control Rod Drive Hydraulic System", Revision 80
ST-8Q, "Testing of the Emergency Service Water System", Revision 41 Documents:
JAF-RPT-CRD-02493, "Maintenance Rule Basis Document System 003 Control Rod Drive Hydraulic System", Revision 8 System Health Report, Control Rod Drive Hydraulic System, 2na Quarter,2Ol1
JAF-RPT-MULTI-02294, "Maintenance Rule Basis Document for Service Water Systems Including Sysetm 10 (RHR SW), 46 (Normal SW), and 46-ESW (Emergency
SW)," Revision 10 System Health Report, Emergency Service Water System, 2no Quarter, 2Q11 Quarterly
SLC system health reports for second quarter 2010 through second quarter 2011
JAF-RPT-SLC-O2282, "Maintenance Rule Basis Document System 11, Standby Liquid Control," Revision 6
JENG-APL-11-OO2, "Maintenance Rule (aX1) Action Plan, System 1 1 Standby Liquid Control," Revision 1 Condition Reports: cR-JAF-2007-00625

cR-JAF-2009-03994

CR-JAF-2O10-00894
CR-JAF-2O10-02557
CR-JAF-201
1-00894

Section 1R13: Maintenance

Risk Assessments and Emerqent Work Control Procedures:
AP-05.13, "Maintenance During LCOs," Revision 10
AP-10.10, "On-Line Risk Assessment," Revision 7
EN-WM-104,"On Line Risk Assessment," Revision 4 Attachment Section 1 R15: Operabilitv Evaluations Procedures:
EN-LI-102, "Corrective Action Process," Revision 16
EN-OP-1 04, "Operabitity Determination Process," Revision 5
ISP-104A, "RPS Reactor Pressure Instrument Response Time Test (ATTS)", Revision 0

Section 1R18: Plant Modifications

EN-DC-1 36, "Temporary Modifications," Revision 6
EN-DC-115, "Engineering Change Process," Revision 10
EN-DC-1 17, "Post Modification Testing and Special Instructions," Revision 4 Documents:
EC 15347 , "lnstall Pomana Type Test Jacks in Panels 09-15, 09-17 for RPS Test Box Use"
EC 25477, "Recirc Tach Generator
2-184P-1A (TACH) 1 15V Output Acceptance"
EC 25480, "Recirc Tach Generator
2-184P-1B (TACH) 115V Output Acceptance"

Section 1R19: Post Maintenance

Testino Procedures:
ST-1MA, "A MCLCS Valve Exercise (lST)", Revision 1
ISP-104A, "RPS Reactor Pressure lnstrument Response Time Testing (ATTS)," Revision 0
ARP 09-5-2-60, "ATTS RPS Div 81 or 82 Gross Fail or TU Inop," Revision 3
ISP-17581, "Reactor and Containment Cooling Instrument Functional Test/Calibration (ATTS)," Revision 16
OP-14, "Core Spray System," Revision 33
IPS-150A, "RCIC Auto lsolation lnstrument Function TesV Calibration (ATTS)," Revision 34

Section 2RS1: Radioloqical

Hazard Assessment and Exposure Controls Procedures:
EN-RP-121, "Radioactive Material Control," Revision.
6,
EN-RP-101, "Access Control for Radiologically Controlled Areas," Revision 6
EN-RP-131, "Air Sampling," Revision.
Documents:
Quality Assurance Audit Report No.
QA-14-2009-JAF-1, "Radiation Protection" Quality Assurance Audit Report No.
QA-14/15-2009-JAF-1, "Radiation Protection

/ Radwaste" Condition Reports: CR-JAF-2o11-01925

CR-JAF-2o11-02747
CR-JAF-2o1
1-03645
CR-JAF-201
1-08585 CR-JAF-2O11-02007
CR-JAF-2O1
1-03076
CR-JAF-2o1
1-03905 CR-JAF-2O11-02394
CR-JAF-2o11-03154
CR-JAF-2011-04367
CR-JAF-2o11-02608
CR-JAF-2O1
1-03350 cR-JAF-2O11-04455

Section 2RS4: Occupational

Dose Assessment Documents:
NVLAP On-Site Assessment Report for Landauer, lnc., May 2010 Personnel Dosimetry Performance Testing Conducted for NVLAP at Pacific Northwest National Laboratory for Landauer, Inc., May 2010

Section 2RSS: Radiation

Monitorinq Instrumentation Procedures:
RP-INST-02.04,"Count Rate Meter, Ludlum Model 177," Revision 6
RP-INST-02.06, "Dose Rate Meter, Bicron Micro-Rem," Revision 3 RP-iNST-02.08, "lon Chamber Dose Rate Meter," Revision 4
RP-INST-03.01, "Area Radiation Monitors," Revision 3
RP-INST-03.03, "Containment Radiation Monitor System Response Test and Preplanned Alternate Monitoring Method," Revision 9
RP-INST-03.04, "PASS Radiation Monitor," Revision 2
RP-I
NST-0 4.01, " Area Radiation Mon itor, Dosimeter Corporation," Revision 5
RP-INST-04.02,"Whole Body Contamination Monitor lPM," Revision 6
EN-RP-308, "SmallArticles Monitor (SAM) Model 9," Revision 4
RP-INST-04.08, "MGPI Telepole WR Extendable
GM Survey Meter," Revision 4
EN-RP-306 , "PM-7 Portal Monitor," Revision 2
RP-INST-05.02, "Electrometer, Victoreen Model 500," Revision 1
SP-03.01, "Main Steam Line and SJAE Radiation Monitor Calibration," Revision 13
SP-03.08, "HR High Range Effluent Monitors," Revision 0
SP-03.08RW, "Radwaste Bldg Gaseous Effluent Monitors Monitor," Revision 1
SP-03.07, "Liquid Process Radiation Monitors," Revision 6
IMP-17 .2, "Process Radiation Monitoring System Liquid Process Radiation Monitors TesVCalibration," Revision 1 5
IMP-17 .12, "VenIilation Radiation Monitor Removal/Return to service for Preventive Maintenance Activities," Revision 14
ISP-17-4A, "Dry Well Continuous Atmospheric Monitoring System," Revision 1
ISP-17-48, "Dry Well Continuous Atmospheric Monitoring System," Revision 1
ISP-26A, "Radwaste Bldg. Exhaust Radiation Monitor ChannelA Functional TesUCalibration," Revision'l Instrument Calibrations Reviewed: Model
RO-20 lon Chamber Survey Meter: #1A0 -
313111; #1107 -
4111111; #1116 - 10/5110;#1118 - 1015110: #1110 -
12113110 Bicron Micro-Rem:#546 - 1Ol28l1Q;#543 -
417110;#544 - 4l7l1O Ludlum Model 177: #348 -
6128111; #366 - 6/29111 Post Accident Sampling System Radiation Monitor: #Rl-507 & #Rl-665 -
416111 Area Radiation Monitor: #19 -
3114111; #24 -
1212110; #26 -
11122110;
  1. 30 -
913110 MGPI Telepole WR Extendable
GM Survey Meter: #11694 -
3129111; #16 -
2118111
PM-7 Portal Monitor: #733 -
12111109 Main Steam Line and SJAE Radiation Monitors:
17RM-150A - 8120108: 17RM-1508 -
8130110 High Range Effluent Monitors:
17RM-53A -
12115109;17RM-53B -
918109 Radwaste Building Gaseous Effluent Monitors:
17RM-458A - 8l25l1O;17RM-4588 - 3/16/10 Liquid Process Radiation Monitors:
17RM-351 -
8125110; 17RM-350 -
9111110 Attachment Process Radiation Monitoring System Liquid Process Radiation Monitors:
17RM-350 -611110;17RM-351 -
611110; 17RM-352 -
611110 Ventilation Radiation Monitor: 17RM-4528 -
1119111 DryWell Continuous Atmospheric Monitoring System: 17RM-102A-617111;
17RM-103A -
617111;17RM-102B -
619111; 17RM-1038 -
619111 Radwaste Building, Exhaust Radiation Monitor ChannelA FunctionalTest/Calibration:
17RM-458A -
514111 Post Accident Containment High Range Radiation Monitors:
27RM-104A -
12111109;27RM-1048 -
911110 Condition Reports: CR-JAF-2010-00508
CR-JAF-2010-01
156 cR-JAF-2010-01893
CR-JAF-2010-02130
CR-JAF-2010-02301
CR-JAF-2O10-02500

cR-JAF-2o10-02702

CR-JAF-2010-02764
CR-JAF-2010-02988
CR-JAF-2o10-03090
CR-JAF-2O10-03180

cR-JAF-2010-03341

CR-JAF-2o10-03411
CR-JAF-2010-03680
CR-JAF-2o10-03989
CR-JAF-2010-04003
CR-JAF-2O10-04018
CR-JAF-2010-04858
CR-JAF-2010-05246
CR-JAF-2O10-05534
CR-JAF-2O10-05688

cR-JAF-2O10-05887

cR-JAF-2O10-07300

cR-JAF-2o10-0797

CR-JAF-2010-08564
CR-JAF-2O1
1-00063
CR-JAF-201
1-00873
CR-JAF-2O1
1-01960 cR-JAF-2O11-02533
CR-JAF-2011-02851

Section 2RS7: Radioloqical

Environmental Monitorinq Proqram Procedures:
SP-04.09, "Environmental Radiological Sample and Land Use Survey Data Collection," Revision 2
DVP-04.01, "JAF Environmental Laboratory Quality Assurance/Quality Control Program," Revision 4
AM-03.03, "Air Particulate Filter Analysis for Gross Beta," Revision 3
AM-03.04, "Radioiodine Cartridge Analysis Using Gamma Spectroscopy," Revision 1
AM-04.04, "Tritium Analysis of Water Samples," Revision 10 Documents:
EA Science and Technology
2010 Nearest Resident Census EA Science and Technology
2010 Mitk Animal Census EA Science and Technology
2010 Garden Census
JAFLO-2009-0089, "RETS/ODCM
Radiological Effluents Organization Condition Report" Focused Assessment Learning Quality Assu ra nce Aud it Repo ft
QA-21 6-2009-JAF-
1, " Chem istry, Effluents.

and Environmental Monitoring" JAF NPP Environmental Laboratory Quality Assurance Report, January 1 through December 31, 2010

EN-CY-102, "Entergy Nuclear Management Manual, Laboratory Analytical Quality Control," Revision 3 Tektronix Certificates of Calibration for Flow Meter Model
AC-250, Numbers 10452, 10436, 12055, 10434, 10872, 10873, 10889, 10871, and 10698 James A. FitzPatrick (JAF) Nuclear Power Plant Annual Radiological Environmental Operations Report, January 1 - December 31, 2010 Attachment
DVP-O1.02, "Offsite Dose Calculation Manual," Revision 11 Selected 2011 Monthly Environmental Sample Results: Milk (April and June); Canal Water (March); Air (April)AREVA Environmental Laboratory
QA Snapshot Self-Assessment, November 2009

Section 4OA2: ldentification

and Resolution of Problems Procedures:

EN-Ll-102, "Corrective Action Process," Revision 16
EN-Ll-119, "Apparent Cause Evaluation (ACE) Process," Revision 11
EN-LI-1 19-01, "Equipment Failure Evaluation," Revision 0
EN-FAP-OP-006, "Operator Aggregate lmpact Index Performance Indicator," Revision 0
EN-OP-1 lT, "Operations Assessments," Revision 3 Condition Reports:
CR-JAF-2o1
1-03394
CR-JAF-201
1-03453 CR-JAF-2011-03462
CR-JAF-2o11-03491
CR-JAF-2011-03517
CR-JAF-2011-03557
CR-JAF-201
1-03699 CR-JAF-2O10-04912
Work Orders: 00'168145
00260441
00262558
0026991 9
00288871
00226615
00253882
00254107
00254293 Section 4OA5: Other Activities Procedures:
CR-JAF-20
1-03772
CR-JAF-2O1
1-03846
CR-JAF-2O1
1-03889
CR-JAF-201
1-04056
CR-JAF-201
1-04090 CR-JAF-2011-04144
CR-JAF-2O11-04208
254824
002551 08
00255131
00256050
00257767
00258129
00258793
00259208
00261300 CR-JAF-2o11-04367

cR-JAF-zo11-Q4378

QR-JAF-2o11-Q4411
CR-JAF-2O11-04470

cR-JAF-2o11-04510

CR-JAF-2011-04736
CR-JAF-2O11-04897
263097
00266823
00271498
00290608
00290609
51101401
51101426
RT-04.14, "Non-REMP
Thermoluminescent Dosimetry (TLD) Program," Revision 3
RP-OPS-0B.01, "Routine Surveys and lnspections," Revision 18 Attachment

LIST OF ACRONYMS

ACE apparent cause evaluation

ADAMS Agencywide

Documents

Access and Management

System ATWS anticipated

transient

without scram CAM continuous

atmospheric

monitoring

CAP corrective

action program CDI condensate

demineralizer

influent

CFR Code of Federal Regulations

CR condition

report CST condensate

storage tank

DBD design basis document

EC engineering

change EDG emergency

diesel generator Entergy Entergy Nuclear Northeast ESOMS electronic

shift operations

management

system ESW emergency

service water oF Fahrenheit

FitzPatrick

James A. FitzPatrick

Nuclear Power Plant HRA high radiation

area ISFSI independent

spent fuel storage installation

IMC inspection

manual chapter IST inservice

test kV kilovolt LCO limiting condition

for operation

LER licensee event report
LPSI low pressure safety injection
MOV motor operated valve

NCV non-cited

violation

NEI Nuclear Energy Institute

NIST National Institute

of Standards

and Technology

NRC Nuclear Regulatory

Commission

NVLAP nationalvoluntarylaboratoryaccreditationprogram

ODCM offsite dose calculation

manual ODMI operational

decision-making

issue PARS Publicly Available

Record PMT post-maintenance

testing

RB reactor building

RBVS reactor building ventilation

system RCIC reactor core isolation

cooling

RCS reactor coolant system

REMP radiological

environmental

monitoring

program

RHR residual heat removal

RPS reactor protection

system RWP radiation

work permit

SGT standby gas treatment
SJAE steam jet air ejector
SLC standby liquid control
SSC structure, system, or component Attachment
ST [[]]
TB [[]]
TLD [[]]
TS [[]]
UFSAR [[]]
URI [[]]
VHRA [[]]

WO A-9 surveillance

test turbine building thermoluminescent

dosimeter tech nical specification

updated final safety analysis report unresolved

item very high radiation

area work order Attachment