ML16237A060: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
  NUCLEAR REGULATORY COMMISSION
  NUCLEAR REGULATORY COMMISSION
  REGION IV
  REGION IV 1600 E LAMAR BLVD
1600 E LAMAR BLVD
  ARLINGTON, TX 76011
  ARLINGTON, TX 76011
-4511 August 31, 2016
-4511 August 31, 2016
Line 29: Line 28:
  Wadsworth, TX 77483
  Wadsworth, TX 77483
  SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2  (REPORT 05000498/2016005 AND 05000499/2016005)
  SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2  (REPORT 05000498/2016005 AND 05000499/2016005)
  Dear Mr. Koehl: On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC)
  Dear Mr. Koehl: O n August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC)
  completed its mid-cycle performance review of South Texas Project Electric Generating Station, Units 1 and 2
  completed its mid-cycle performance review of South Texas Project Electric Generating Station, Units 1 and 2.  The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July
.  The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July
  1, 2015 through June
  1, 2015 through June
  30, 2016.  This letter informs you of the NRC's assessment of your facility during this period and its plans for future  
  30, 2016.  This letter informs you of the NRC's assessment of your facility during this period and its plans for future  
Line 39: Line 37:
Station, Units 1 and
Station, Units 1 and
  during the most recent quarter was within the Licensee Response Column of the NRC
  during the most recent quarter was within the Licensee Response Column of the NRC
's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e.,  
's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green).  Therefore, the NRC plans to conduct ROP baseline inspections at your facility.  The enclosed inspection plan lists the inspections scheduled through June 30 , 2018.  Routine inspections performed by resident inspectors are not included in the inspection plan.  The inspections listed during the second half
Green).  Therefore, the NRC plans to conduct ROP baseline inspections at your facility.  The enclosed inspection plan lists the inspections scheduled through June 30, 2018.  Routine inspections performed by resident inspectors are not included in the inspection plan.  The inspections listed during the second half
  of the inspection plan are tentative and may be revised at the end
  of the inspection plan are tentative and may be revised at the end
-of-cycle performance review.  The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel
-of-cycle performance review.  The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel
Line 50: Line 47:
-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation."  The NRC conducted audits of licensee efforts  
-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation."  The NRC conducted audits of licensee efforts  
    
    
D. Koehl - 2 - towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site.  After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued.  Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191,  
D. Koehl - 2 - towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site.  After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued.  Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness  
"Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness  
Communication/Staffing/Multi
Communication/Staffing/Multi
-Unit Dose Assessment Plans."  In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re
-Unit Dose Assessment Plans."  In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re
Line 57: Line 53:
-cycle assessment process beginning in calendar year 2017.  This will be the final mid
-cycle assessment process beginning in calendar year 2017.  This will be the final mid
-cycle assessment letter.  The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of  
-cycle assessment letter.  The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of  
licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,  
licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program."
"Operating Reactor Assessment Program."
  In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390
  In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390
  of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of  
  of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of  
Line 67: Line 62:
  Please contact  
  Please contact  
me at 817-200-1141 with any questions you have regarding this letter.
me at 817-200-1141 with any questions you have regarding this letter.
  Sincerely,
  Sincerely, /RA/ Nicholas H. Taylor, Chief Projects Branch B
/RA/ Nicholas H. Taylor, Chief Projects Branch B
  Division of Reactor Projects Docket Nos.:  50-498, 50-499 License Nos.:  NPF-76 and NPF
  Division of Reactor Projects Docket Nos.:  50-498, 50-499 License Nos.:  NPF-76 and NPF
-80 Enclosure:
-80 Enclosure:   South Texas Project Electric Generating
  South Texas Project Electric Generating
  Station, Units 1 and 2 Inspection/
  Station, Units 1 and 2 Inspection/
   Activity Plan
   Activity Plan
Line 77: Line 70:
Page 1 of 3
Page 1 of 3
08/30/2016
08/30/2016
09:36:28Report 22
09:36:28 Report 22 Unit NumberPlanned Dates
UnitNumberPlanned Dates
Start          EndInspection ActivityTitle No. of Staff
Start          EndInspection ActivityTitleNo. of Staff
on SiteSouth Texas ProjectInspection / Activity Plan
on SiteSouth Texas ProjectInspection / Activity Plan
07/01/2016
07/01/2016
-06/30/2018
-06/30/2018
EP-2-EP PERFORMANCE INDICATORS
EP-2-EP PERFORMANCE INDICATORS
21 IPDrill/Exercise Performance71151-EP0107/11/2016
2 1 IP Drill/Exercise Performance71151-EP0107/11/2016
07/15/2016
07/15/2016
1 IPERO Readiness71151-EP0207/11/2016
1 IP ERO Readiness71151-EP0207/11/2016
07/15/2016
07/15/2016
1 IPAlert & Notification System Reliability71151-EP0307/11/2016
1 IP A lert & Notification System Reliability71151-EP0307/11/2016
07/15/2016
07/15/2016
EP-3-BIENNIAL EP EXERCISE INSPECTION
EP-3-BIENNIAL EP EXERCISE INSPECTION
41 IPExercise Evaluation711140107/11/2016
4 1 IP Exercise Evaluation711140107/11/2016
07/15/2016
07/15/2016
1 IPEmergency Action Level and Emergency Plan Changes711140407/11/2016
1 IP Emergency Action Level and Emergency Plan Changes711140407/11/2016
07/15/2016TSB 52B-BIENNIAL PI&R INSPECTION
07/15/2016TSB 52B-BIENNIAL PI&R INSPECTION
41, 2 IPProblem Identification and Resolution71152B08/08/2016
4 1, 2 IP Problem Identification and Resolution71152B 08/08/2016
08/12/2016
08/12/2016
1, 2 IPProblem Identification and Resolution71152B08/22/2016
1, 2 IP Problem Identification and Resolution71152B 08/22/2016
08/26/201671111.08-INSERVICE INSPECTION
08/26/201671111.08-INSERVICE INSPECTION
12 IPInservice Inspection Activities - PWR7111108P10/10/2016
1 2 IP Inservice Inspection Activities - PWR7111108P 10/10/2016
10/21/2016
10/21/2016
RS 12 PI-RADIATION SAFETY
RS 12 PI-RADIATION SAFETY
21, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/24/2016
2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/24/2016
10/28/2016
10/28/2016
1, 2 IPOccupational ALARA Planning and Controls71124.0210/24/2016
1, 2 IP Occupational ALARA Planning and Controls71124.02 10/24/2016
10/28/2016
10/28/2016
1, 2 IPOccupational Exposure Control Effectiveness71151-OR01
1, 2 IP Occupational Exposure Control Effectiveness71151-OR01
10/24/2016
10/24/2016
10/28/2016
10/28/2016
1, 2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01
1, 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01
10/24/2016
10/24/2016
10/28/2016
10/28/2016
RS 5678-RADIATION SAFETY - TEAM
RS 5678-RADIATION SAFETY - TEAM
41, 2 IPRadiation Monitoring Instrumentation71124.0511/28/2016
4 1, 2 IP Radiation Monitoring Instrumentation71124.0511/28/2016
12/02/2016
12/02/2016
1, 2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0611/28/2016
1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.0611/28/2016
12/02/2016
12/02/2016
1, 2 IPRadiological Environmental Monitoring Program71124.0711/28/2016
1, 2 IP Radiological Environmental Monitoring Program71124.0711/28/2016
12/02/2016
12/02/2016
1, 2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/28/2016
1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/28/2016
12/02/2016
12/02/2016
EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION
EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION
41, 2 IPFire Protection [Triennial]7111105T01/23/2017
4 1, 2 IP Fire Protection [Triennial]7111105T 01/23/2017
01/27/2017
01/27/2017
1, 2 IPFire Protection [Triennial]7111105T02/06/2017
1, 2 IP Fire Protection [Triennial]7111105T 02/06/2017
02/10/2017EXAM-INITIAL EXAM
02/10/2017EXAM-INITIAL EXAM
61 INITIAL EXAM STP U1 (09/2017)
6 1 INITIAL EXAM STP U1 (09/2017)
X0259208/14/2017
X02592 08/14/2017
08/18/2017
08/18/2017
2 INITIAL EXAM STP U2 (09/2017)
2 INITIAL EXAM STP U2 (09/2017)
X0259308/14/2017
X02593 08/14/2017
08/18/2017
08/18/2017
1 INITIAL EXAM STP U1 (09/2017)
1 INITIAL EXAM STP U1 (09/2017)
X0259209/25/2017
X02592 09/25/2017
10/04/2017
10/04/2017
2 INITIAL EXAM STP U2 (09/2017)
2 INITIAL EXAM STP U2 (09/2017)
X0259309/25/2017
X02593 09/25/2017
10/04/2017
10/04/2017
RS 13 PI-RADIATION SAFETY
RS 13 PI-RADIATION SAFETY
31, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0103/27/2017
3 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/27/2017
03/31/2017
03/31/2017
1, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/27/2017
1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/27/2017
03/31/2017
03/31/2017
1, 2 IPOccupational Exposure Control Effectiveness71151-OR01
1, 2 IP Occupational Exposure Control Effectiveness71151-OR01
03/27/2017
03/27/2017
03/31/2017
03/31/2017
Line 150: Line 142:
Page 2 of 3
Page 2 of 3
08/30/2016
08/30/2016
09:36:28Report 22
09:36:28 Report 22 Unit NumberPlanned Dates
UnitNumberPlanned Dates
Start          EndInspection ActivityTitle No. of Staff
Start          EndInspection ActivityTitleNo. of Staff
on SiteSouth Texas ProjectInspection / Activity Plan
on SiteSouth Texas ProjectInspection / Activity Plan
07/01/2016
07/01/2016
-06/30/2018
-06/30/2018
RS 13 PI-RADIATION SAFETY
RS 13 PI-RADIATION SAFETY
31, 2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01
3 1, 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01
03/27/2017
03/27/2017
03/31/201771111.08-INSERVICE INSPECTION UNIT 1
03/31/201771111.08-INSERVICE INSPECTION UNIT 1
11 IPInservice Inspection Activities - PWR7111108P03/27/2017
1 1 IP Inservice Inspection Activities - PWR7111108P 03/27/2017
04/07/2017
04/07/2017
EP-1-BIENNIAL EP PROGRAM INSPECTION
EP-1-BIENNIAL EP PROGRAM INSPECTION
11, 2 IPAlert and Notification System Testing711140205/08/2017
1 1, 2 IP A lert and Notification System Testing7111402 05/08/2017
05/12/2017
05/12/2017
1, 2 IPEmergency Preparedness Organization Staffing and Augmentation System711140305/08/2017
1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 05/08/2017
05/12/2017
05/12/2017
1, 2 IPEmergency Action Level and Emergency Plan Changes711140405/08/2017
1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 05/08/2017
05/12/2017
05/12/2017
1, 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140505/08/2017
1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 05/08/2017
05/12/2017
05/12/2017
EP-2-EP PERFORMANCE INDICATOR VERIFICATION
EP-2-EP PERFORMANCE INDICATOR VERIFICATION
11, 2 IPDrill/Exercise Performance71151-EP01
1 1, 2 IP Drill/Exercise Performance71151-EP01
05/08/2017
05/08/2017
05/12/2017
05/12/2017
1, 2 IPERO Readiness71151-EP02
1, 2 IP ERO Readiness71151-EP02
05/08/2017
05/08/2017
05/12/2017
05/12/2017
1, 2 IPAlert & Notification System Reliability71151-EP03
1, 2 IP A lert & Notification System Reliability71151-EP03
05/08/2017
05/08/2017
05/12/2017
05/12/2017
EB1-17T-STP 50.59 EVALUATIONS OF CHANGES, TESTS
EB1-17T-STP 50.59 EVALUATIONS OF CHANGES, TESTS
31, 2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T05/22/2017
3 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 05/22/2017
05/26/2017
05/26/2017
1, 2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/05/2017
1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 06/05/2017
06/09/2017
06/09/2017
ISFSI-DRY RUN INSPECTION (MULTIPLE WEEKS)
ISFSI-DRY RUN INSPECTION (MULTIPLE WEEKS)
11, 2 IPPreoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants
1 1, 2 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants
60854.106/01/2017
60854.1 06/01/2017
07/20/2017
07/20/2017
RS 24-RADIATION SAFETY
RS 24-RADIATION SAFETY
21, 2 IPOccupational ALARA Planning and Controls71124.0207/31/2017
2 1, 2 IP Occupational ALARA Planning and Controls71124.02 07/31/2017
08/04/2017
08/04/2017
1, 2 IPOccupational Dose Assessment71124.0407/31/2017
1, 2 IP Occupational Dose Assessment71124.04 07/31/2017
08/04/2017
08/04/2017
ISFSI-FIRST CASK LOADING INSPECTION
ISFSI-FIRST CASK LOADING INSPECTION
11, 2 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants
1 1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants
60855.108/01/2017
60855.1 08/01/2017
08/10/2017
08/10/2017
BRQ-BRQ INSPECTION
BRQ-BRQ INSPECTION
31, 2 IPLicensed Operator Requalification Program7111111B08/28/2017
3 1, 2 IP Licensed Operator Requalification Program7111111B 08/28/2017
09/01/20177111108-INSERVICE INSPECTION UNIT 2
09/01/20177111108-INSERVICE INSPECTION UNIT 2
12 IPInservice Inspection Activities - PWR7111108P04/02/2018
1 2 IP Inservice Inspection Activities - PWR7111108P 04/02/2018
04/13/2018
04/13/2018
EB1-07T-STP HEAT SINK PERFORMANCE
EB1-07T-STP HEAT SINK PERFORMANCE
11, 2 IPHeat Sink Performance7111107T06/11/2018
1 1, 2 IP Heat Sink Performance7111107T06/11/2018
06/15/2018
06/15/2018
EP-1-EP EXERCISE INSPECTION
EP-1-EP EXERCISE INSPECTION
41, 2 IPExercise Evaluation711140106/11/2018
4 1, 2 IP Exercise Evaluation711140106/11/2018
06/15/2018
06/15/2018
1, 2 IPEmergency Action Level and Emergency Plan Changes711140406/11/2018
1, 2 IP Emergency Action Level and Emergency Plan Changes711140406/11/2018
06/15/2018
06/15/2018
1, 2 IPDrill/Exercise Performance71151-EP0106/11/2018
1, 2 IP Drill/Exercise Performance71151-EP0106/11/2018
06/15/2018
06/15/2018
This report does not include INPO and OUTAGE activities. This report shows only on-site
This report does not include INPO and OUTAGE activities. This report shows only on-site
Line 218: Line 209:
Page 3 of 3
Page 3 of 3
08/30/2016
08/30/2016
09:36:28Report 22
09:36:28 Report 22 Unit NumberPlanned Dates
UnitNumberPlanned Dates
Start          EndInspection ActivityTitle No. of Staff
Start          EndInspection ActivityTitleNo. of Staff
on SiteSouth Texas ProjectInspection / Activity Plan
on SiteSouth Texas ProjectInspection / Activity Plan
07/01/2016
07/01/2016
-06/30/2018
-06/30/2018
EP-1-EP EXERCISE INSPECTION
EP-1-EP EXERCISE INSPECTION
41, 2 IPERO Readiness71151-EP0206/11/2018
4 1, 2 IP ERO Readiness71151-EP0206/11/2018
06/15/2018
06/15/2018
1, 2 IPAlert & Notification System Reliability71151-EP0306/11/2018
1, 2 IP A lert & Notification System Reliability71151-EP0306/11/2018
06/15/2018
06/15/2018
This report does not include INPO and OUTAGE activities. This report shows only on-site
This report does not include INPO and OUTAGE activities. This report shows only on-site
Line 236: Line 226:
  By:  NHT ADAMS  Yes    No  Publicly Available
  By:  NHT ADAMS  Yes    No  Publicly Available
   Non-Publicly Available
   Non-Publicly Available
   Non-Sensitive
   Non-Sensitive Sensitive Keyword: NRC-002 OFFICE: RIV SPE:DRP/B D: DRS D: DRP C: DRP/B  NAME DProulx AVegel TWPruett NTaylor  SIGNATURE /RA/ /RA Jeff Clark for/
  Sensitive
Keyword: NRC-002 OFFICE: RIV SPE:DRP/B
D: DRS D: DRP C: DRP/B  NAME DProulx AVegel TWPruett NTaylor  SIGNATURE
/RA/ /RA Jeff Clark for/
  /RA/ /RA/  DATE 8/22/16 8/22/16 8/23/16 8/23/16     
  /RA/ /RA/  DATE 8/22/16 8/22/16 8/23/16 8/23/16     
Letter to Dennis Koehl
Letter to Dennis Koehl

Revision as of 05:34, 8 July 2018

Mid-Cycle Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2016005 and 05000499/2016005)
ML16237A060
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 08/31/2016
From: Taylor N H
NRC/RGN-IV/DRP/RPB-B
To: Koehl D
South Texas
Taylor N H
References
IR 2016005
Download: ML16237A060 (7)


See also: IR 05000498/2016005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV 1600 E LAMAR BLVD

ARLINGTON, TX 76011

-4511 August 31, 2016

Mr. Dennis Koehl

President and Chief Executive Officer

STP Nuclear Operating Company

P.O. Box 289

Wadsworth, TX 77483

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2016005 AND 05000499/2016005)

Dear Mr. Koehl: O n August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC)

completed its mid-cycle performance review of South Texas Project Electric Generating Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July

1, 2015 through June

30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future

inspections at your facility.

The NRC determined that overall, South Texas Project Electric Generating Station, Units 1 and

2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at South Texas Project Electric Generating

Station, Units 1 and

during the most recent quarter was within the Licensee Response Column of the NRC

's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30 , 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half

of the inspection plan are tentative and may be revised at the end

-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel

availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA

-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond

-Design-Basis External Events

," and Order EA

-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." The NRC conducted audits of licensee efforts

D. Koehl - 2 - towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness

Communication/Staffing/Multi

-Unit Dose Assessment Plans." In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re

-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid

-cycle assessment process beginning in calendar year 2017. This will be the final mid

-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of

licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program."

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390

of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html

(the Public Electronic Reading Room).

Please contact

me at 817-200-1141 with any questions you have regarding this letter.

Sincerely, /RA/ Nicholas H. Taylor, Chief Projects Branch B

Division of Reactor Projects Docket Nos.: 50-498, 50-499 License Nos.: NPF-76 and NPF

-80 Enclosure: South Texas Project Electric Generating

Station, Units 1 and 2 Inspection/

Activity Plan

Page 1 of 3

08/30/2016

09:36:28 Report 22 Unit NumberPlanned Dates

Start EndInspection ActivityTitle No. of Staff

on SiteSouth Texas ProjectInspection / Activity Plan

07/01/2016

-06/30/2018

EP-2-EP PERFORMANCE INDICATORS

2 1 IP Drill/Exercise Performance71151-EP0107/11/2016

07/15/2016

1 IP ERO Readiness71151-EP0207/11/2016

07/15/2016

1 IP A lert & Notification System Reliability71151-EP0307/11/2016

07/15/2016

EP-3-BIENNIAL EP EXERCISE INSPECTION

4 1 IP Exercise Evaluation711140107/11/2016

07/15/2016

1 IP Emergency Action Level and Emergency Plan Changes711140407/11/2016

07/15/2016TSB 52B-BIENNIAL PI&R INSPECTION

4 1, 2 IP Problem Identification and Resolution71152B 08/08/2016

08/12/2016

1, 2 IP Problem Identification and Resolution71152B 08/22/2016

08/26/201671111.08-INSERVICE INSPECTION

1 2 IP Inservice Inspection Activities - PWR7111108P 10/10/2016

10/21/2016

RS 12 PI-RADIATION SAFETY

2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/24/2016

10/28/2016

1, 2 IP Occupational ALARA Planning and Controls71124.02 10/24/2016

10/28/2016

1, 2 IP Occupational Exposure Control Effectiveness71151-OR01

10/24/2016

10/28/2016

1, 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01

10/24/2016

10/28/2016

RS 5678-RADIATION SAFETY - TEAM

4 1, 2 IP Radiation Monitoring Instrumentation71124.0511/28/2016

12/02/2016

1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.0611/28/2016

12/02/2016

1, 2 IP Radiological Environmental Monitoring Program71124.0711/28/2016

12/02/2016

1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/28/2016

12/02/2016

EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION

4 1, 2 IP Fire Protection [Triennial]7111105T 01/23/2017

01/27/2017

1, 2 IP Fire Protection [Triennial]7111105T 02/06/2017

02/10/2017EXAM-INITIAL EXAM

6 1 INITIAL EXAM STP U1 (09/2017)

X02592 08/14/2017

08/18/2017

2 INITIAL EXAM STP U2 (09/2017)

X02593 08/14/2017

08/18/2017

1 INITIAL EXAM STP U1 (09/2017)

X02592 09/25/2017

10/04/2017

2 INITIAL EXAM STP U2 (09/2017)

X02593 09/25/2017

10/04/2017

RS 13 PI-RADIATION SAFETY

3 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/27/2017

03/31/2017

1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/27/2017

03/31/2017

1, 2 IP Occupational Exposure Control Effectiveness71151-OR01

03/27/2017

03/31/2017

This report does not include INPO and OUTAGE activities. This report shows only on-site

and announced inspection procedures.

Page 2 of 3

08/30/2016

09:36:28 Report 22 Unit NumberPlanned Dates

Start EndInspection ActivityTitle No. of Staff

on SiteSouth Texas ProjectInspection / Activity Plan

07/01/2016

-06/30/2018

RS 13 PI-RADIATION SAFETY

3 1, 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01

03/27/2017

03/31/201771111.08-INSERVICE INSPECTION UNIT 1

1 1 IP Inservice Inspection Activities - PWR7111108P 03/27/2017

04/07/2017

EP-1-BIENNIAL EP PROGRAM INSPECTION

1 1, 2 IP A lert and Notification System Testing7111402 05/08/2017

05/12/2017

1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 05/08/2017

05/12/2017

1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 05/08/2017

05/12/2017

1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 05/08/2017

05/12/2017

EP-2-EP PERFORMANCE INDICATOR VERIFICATION

1 1, 2 IP Drill/Exercise Performance71151-EP01

05/08/2017

05/12/2017

1, 2 IP ERO Readiness71151-EP02

05/08/2017

05/12/2017

1, 2 IP A lert & Notification System Reliability71151-EP03

05/08/2017

05/12/2017

EB1-17T-STP 50.59 EVALUATIONS OF CHANGES, TESTS

3 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 05/22/2017

05/26/2017

1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 06/05/2017

06/09/2017

ISFSI-DRY RUN INSPECTION (MULTIPLE WEEKS)

1 1, 2 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants

60854.1 06/01/2017

07/20/2017

RS 24-RADIATION SAFETY

2 1, 2 IP Occupational ALARA Planning and Controls71124.02 07/31/2017

08/04/2017

1, 2 IP Occupational Dose Assessment71124.04 07/31/2017

08/04/2017

ISFSI-FIRST CASK LOADING INSPECTION

1 1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants

60855.1 08/01/2017

08/10/2017

BRQ-BRQ INSPECTION

3 1, 2 IP Licensed Operator Requalification Program7111111B 08/28/2017

09/01/20177111108-INSERVICE INSPECTION UNIT 2

1 2 IP Inservice Inspection Activities - PWR7111108P 04/02/2018

04/13/2018

EB1-07T-STP HEAT SINK PERFORMANCE

1 1, 2 IP Heat Sink Performance7111107T06/11/2018

06/15/2018

EP-1-EP EXERCISE INSPECTION

4 1, 2 IP Exercise Evaluation711140106/11/2018

06/15/2018

1, 2 IP Emergency Action Level and Emergency Plan Changes711140406/11/2018

06/15/2018

1, 2 IP Drill/Exercise Performance71151-EP0106/11/2018

06/15/2018

This report does not include INPO and OUTAGE activities. This report shows only on-site

and announced inspection procedures.

Page 3 of 3

08/30/2016

09:36:28 Report 22 Unit NumberPlanned Dates

Start EndInspection ActivityTitle No. of Staff

on SiteSouth Texas ProjectInspection / Activity Plan

07/01/2016

-06/30/2018

EP-1-EP EXERCISE INSPECTION

4 1, 2 IP ERO Readiness71151-EP0206/11/2018

06/15/2018

1, 2 IP A lert & Notification System Reliability71151-EP0306/11/2018

06/15/2018

This report does not include INPO and OUTAGE activities. This report shows only on-site

and announced inspection procedures.

ML16237A06

0 SUNSI Review

By: NHT ADAMS Yes No Publicly Available

Non-Publicly Available

Non-Sensitive Sensitive Keyword: NRC-002 OFFICE: RIV SPE:DRP/B D: DRS D: DRP C: DRP/B NAME DProulx AVegel TWPruett NTaylor SIGNATURE /RA/ /RA Jeff Clark for/

/RA/ /RA/ DATE 8/22/16 8/22/16 8/23/16 8/23/16

Letter to Dennis Koehl

from Nicholas H. Taylor dated August 31, 2016

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2

(REPORT 05000498/2016005 AND 05000499/2016005)

DISTRIBUTION

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Alfred.Sanchez@nrc.gov) Resident Inspector (Nicholas.Hernandez@nrc.gov)

Branch Chief, DRP/B (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

STP Administrative Assistant (Lynn.Wright@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Lisa.Regner@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Director, DIRS, NRR (Chris.Miller@nrc.gov)

Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

Director, DPR, NSIR (Marissa.Bailey@nrc.gov)

DRP Branch Chiefs (R4DRPBC@nrc.gov)

DRS Branch Chiefs (R4DRSBC@nrc.gov)

ROPreports.Resource@nrc.gov

ROPassessment.Resource@nrc.gov